Analisis IncrementalMichael Candriawan (2813100005)
I Putu Ekayana Paramardika Putra (2813100014)Mathias Rainaldo (2813100017)
![Page 2: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/2.jpg)
Definisi Analisis Incremental
Analisis Incremental adalah pemilihan atas dua alternatif dengan cara menentukan selisih cash flow dari kedua alternatif, umumnya dipakai untuk menentukan IRR (Internal Rate of Return .
![Page 3: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/3.jpg)
Konsep
• Analisis bisa dilakukan jika alternative lebih dari 1• Analisis incremental dapat berupa grafik atau numeric• Jika IRR > MARR, terima proyek tersebut.
Jika IRR = MARR, hindari proyek tersebut.Jika IRR < MARR, tolak proyek tersebut.
![Page 4: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/4.jpg)
Contoh Metode Grafik
• Ada 2 alternatif dengan tingkat bunga 6%.
• Alt. 1 : PVcost $10 PVbenefit = $15(P/F;6%;1) = 15(0.9434) = 14.15
• Alt. 2 : PVcost = $20 PVbenefit = 28(P/f;6%;1) = 28(0.9434) = 26.42
Tahun Alt.1 Alt.2
0 -$10 -$20
1 15 28
![Page 5: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/5.jpg)
Contoh Metode Grafik
Slope Increment > slope 6%-> Increment Dipilih-> Pilih alternative dengan cost yang lebih besar-> Pilih Alternatif 2
![Page 6: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/6.jpg)
Contoh Metode Matematis
• Incremental ROR (ΔROR)10 = 13 (P/f;I,1) -> (P/f;1,1) = 10/13 = 0,7692ΔROR > MARR -> Increment Dipilih -> Pilih Alt. dg Cost Break -> Pilih Alternatif 2
Tahun Alt.1 Alt.2
0 -$10 -$20
1 15 28
Tahun Alt.2-Alt.1
0 -20 - (-10) -10
1 28 – 15 13
• Perbedaan antar alternatif :
![Page 7: Analisis Incremental](https://reader036.fdokumen.com/reader036/viewer/2022082418/5695d2301a28ab9b02997327/html5/thumbnails/7.jpg)
Langkah - Langkah
• Urutkan alternatif dari investasi terendah sampai tertinggi • Tentukan alternatif dengan investasi terendah sebagai current best• Bandingkan current best dengan penantang yaitu yang investasinya
lebih tinggi.- Buat analisis inkremental cash flow dan hitung ROR
inkrementalnya - Bandingkan ROR inkremental dengan MARR- Jika inkremental > MARR -> penantang jadi current best - Jika inkremental < = MARR, current best tetap