Analisa Paving Block

2
DAFTAR ANALISA SNI 03-2838-2002 - 5a - Bahan : 1.100 M2 Paving Block @ 0.050 Pasir Pasang @ - Tenaga Kerja : 0.100 OH Pekerja @ 0.150 OH Tukang @ 0.015 OH Kepala Tukang @ 0.013 OH Mandor @ Jumlah Dibulatkan 1 m 2 Pemasangan Paving Block M 3

description

f

Transcript of Analisa Paving Block

ANALISADAFTAR ANALISA

SNI 03-2838-2002 - 5a1 m2 Pemasangan Paving Block - Bahan :1.100M2Paving [email protected] [email protected] - Tenaga Kerja :[email protected]@0.00.015OHKepala [email protected]@0.0Jumlah0.0Dibulatkan0.0