Analisa Jalan Paving Block

download Analisa Jalan Paving Block

of 6

Transcript of Analisa Jalan Paving Block

  • 7/29/2019 Analisa Jalan Paving Block

    1/6

    Jenis Pekerjaan : Galian Tanah BiasaKuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,7500 69.000,00 51.750,00 2 Mandor O/H 0,0250 74.750,00 1.868,75

    B. BAHAN

    C. PERALATAN

    D. JUMLAH (A+B+C) 53.618,75 E. BIAYA UMUM 5.361,88 F. HARGA SATUAN PEKERJAAN (D+E) 58.980,63

    Jenis Pekerjaan : Urugan PasirKuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,3000 69.000,00 20.700,00 2 Mandor O/H 0,0250 74.750,00 1.868,75

    B. BAHAN1 Pasir Kasar M3 1,2000 174.000,00 208.800,00

    C. PERALATAN

    D. JUMLAH (A+B+C) 231.368,75 E. BIAYA UMUM 23.136,88 F. HARGA SATUAN PEKERJAAN (D+E) 254.505,63

    URAIAN

    URAIAN

  • 7/29/2019 Analisa Jalan Paving Block

    2/6

    Jenis Pekerjaan : Timbunan Tanah Bekas GalianKuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,2000 69.000,00 13.800,00 2 Mandor O/H 0,0100 74.750,00 747,50

    B. BAHAN

    C. PERALATAN

    D. JUMLAH (A+B+C) 14.547,50 E. BIAYA UMUM 1.454,75 F. HARGA SATUAN PEKERJAAN (D+E) 16.002,25

    Jenis Pekerjaan : Urugan Sirtu Dipadatkan (Lapisan Pondasi Jalan)Kuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,2500 69.000,00 17.250,00 2 Mandor O/H 0,0250 74.750,00 1.868,75

    B. BAHAN1 Sirtu M3 1,2000 102.000,00 122.400,00

    C. PERALATAN1 Vibro Roller Jam 0,0040 460.000,00 1.840,00 2 Dump Truck Jam 0,1800 287.500,00 51.750,00 3 Alat Bantu Ls 1,0000 5.750,00 5.750,00 D. JUMLAH (A+B+C) 200.858,75 E. BIAYA UMUM 20.085,88 F. HARGA SATUAN PEKERJAAN (D+E) 220.944,63

    Jenis Pekerjaan : Penyiapan/Pembentukan Badan JalanKuantitas Pekerjaan : 1 M2No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,0020 69.000,00 138,00 2 Mandor O/H 0,0010 74.750,00 74,75

    B. BAHAN

    C. PERALATAN1 Motor Grader Jam 0,0025 460.000,00 1.150,00

    2 Water Tangker Jam 0,0030 230.000,00 690,00 3 Alat Bantu Ls 1,0000 5.750,00 5.750,00

    D. JUMLAH (A+B+C) 7.802,75 E. BIAYA UMUM 780,28 F. HARGA SATUAN PEKERJAAN (D+E) 8.583,03

    URAIAN

    URAIAN

    URAIAN

  • 7/29/2019 Analisa Jalan Paving Block

    3/6

    Jenis Pekerjaan : Timbunan Tanah Pilihan (Bahu Jalan)Kuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,0714 69.000,00 4.926,60 2 Mandor O/H 0,0178 74.750,00 1.330,55

    B. BAHAN1 Tanah Pilihan M3 1,2000 96.000,00 115.200,00

    C. PERALATAN1 Dump Truck Jam 0,1807 287.500,00 51.951,25 2 Motor Grader Jam 0,0117 460.000,00 5.382,00 3 Vibro Roller Jam 0,0214 460.000,00 9.844,00 4 Alat Bantu Ls 0,0070 5.750,00 40,25 D. JUMLAH (A+B+C) 188.674,65 E. BIAYA UMUM 18.867,47 F. HARGA SATUAN PEKERJAAN (D+E) 207.542,12

    Jenis Pekerjaan : Pasangan Paving Block K. 225 uk=21.10,5.8 cmKuantitas Pekerjaan : 1 M2No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,2000 69.000,00 13.800,00 2 Mandor O/H 0,0100 74.750,00 747,50 3 Tukang Batu O/H 0,0150 97.750,00 1.466,25

    B. BAHAN1 Paving Blok K 225 Polos Bh 39,0000 2.875,00 112.125,00 2 Paving Blok K 225 Warna Bh 4,0000 3.450,00 13.800,00 3 Pasir Kasar M3 0,1000 174.000,00 17.400,00

    C. PERALATAN1 Roller Vibro Jam 0,0020 460.000,00 920,00 D. JUMLAH (A+B+C) 160.258,75 E. BIAYA UMUM 16.025,88 F. HARGA SATUAN PEKERJAAN (D+E) 176.284,63

    URAIAN

    URAIAN

  • 7/29/2019 Analisa Jalan Paving Block

    4/6

    Jenis Pekerjaan : Pasangan Batu belah 1 : 4Kuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 1,5000 69.000,00 103.500,00 2 Mandor O/H 0,0750 74.750,00 5.606,25 3 Tukang Batu O/H 0,6000 86.250,00 51.750,00

    B. BAHAN1 Batu Kali/Batu Belah M3 1,2000 156.000,00 187.200,00 2 Semen Kg 163,0000 1.610,00 262.430,00 3 Pasir pasang M3 0,5200 180.000,00 93.600,00

    C. PERALATAN

    D. JUMLAH (A+B+C) 704.086,25 E. BIAYA UMUM 70.408,63 F. HARGA SATUAN PEKERJAAN (D+E) 774.494,88

    Jenis Pekerjaan : Plesteran 1:4Kuantitas Pekerjaan : 1 M2No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,2000 69.000,00 13.800,00 2 Mandor O/H 0,0100 74.750,00 747,50 3 Tukang Batu O/H 0,1500 86.250,00 12.937,50

    B. BAHAN1 Semen Kg 4,3200 1.610,00 6.955,20 2 Pasir pasang M3 0,0220 180.000,00 3.960,00

    C. PERALATAN

    D. JUMLAH (A+B+C) 38.400,20 E. BIAYA UMUM 3.840,02 F. HARGA SATUAN PEKERJAAN (D+E) 42.240,22

    Jenis Pekerjaan : Plesteran Siar Sp 1 : 2Kuantitas Pekerjaan : 1 M2No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,3400 69.000,00 23.460,00 2 Mandor O/H 0,1500 74.750,00 11.212,50 3 Tukang Batu O/H 0,1400 86.250,00 12.075,00

    B. BAHAN1 Semen Kg 6,3400 1.610,00 10.207,40 2 Pasir pasang M3 0,0120 180.000,00 2.160,00

    C. PERALATAN

    D. JUMLAH (A+B+C) 59.114,90 E. BIAYA UMUM 5.911,49 F. HARGA SATUAN PEKERJAAN (D+E) 65.026,39

    URAIAN

    URAIAN

    URAIAN

  • 7/29/2019 Analisa Jalan Paving Block

    5/6

    Jenis Pekerjaan : Acian Semen Abu-abu tebal 1,5 mmKuantitas Pekerjaan : 1 M2No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 0,1200 69.000,00 8.280,00 2 Mandor O/H 0,0060 74.750,00 448,50

    3 Tukang Batu O/H 0,0560 86.250,00 4.830,00

    B. BAHAN1 Semen Kg 0,0580 1.610,00 93,38

    C. PERALATAN

    D. JUMLAH (A+B+C) 13.651,88 E. BIAYA UMUM 1.365,19 F. HARGA SATUAN PEKERJAAN (D+E) 15.017,07

    Jenis Pekerjaan : Beton Tumbuk 1 : 3 : 5Kuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 1,6500 69.000,00 113.850,00 2 Mandor O/H 0,0800 74.750,00 5.980,00 3 Tukang Batu O/H 0,2500 86.250,00 21.562,50

    B. BAHAN

    1 Semen Kg 218,0000 1.610,00 350.980,00 2 Pasir Pasang M3 0,5200 180.000,00 93.600,00 3 Batu Pecah 1/3 M3 0,8700 300.000,00 261.000,00

    C. PERALATAND. JUMLAH (A+B+C) 846.972,50 E. BIAYA UMUM 84.697,25 F. HARGA SATUAN PEKERJAAN (D+E) 931.669,75

    URAIAN

    URAIAN

  • 7/29/2019 Analisa Jalan Paving Block

    6/6

    Jenis Pekerjaan : Beton Bertulang 1 : 2 : 3 (175 Kg Besi)Kuantitas Pekerjaan : 1 M3No SAT. KUANTITAS HARGA SAT. JMLH HARGA

    (Rp) (Rp)

    A. TENAGA KERJA1 Pekerja O/H 3,9000 69.000,00 269.100,00 2 Mandor O/H 0,1650 74.750,00 12.333,75 3 Tukang O/H 0,3500 86.250,00 30.187,50

    4 Kepala Tukang O/H 1,0500 97.750,00 102.637,50

    B. BAHAN1 Papan Kayu kls III M3 0,2000 1.593.000,00 318.600,00 2 Paku Biasa Kg 1,5000 20.700,00 31.050,00 3 Minyak Bekisting Lt 0,4000 2.300,00 920,00 2 Besi Beton Kg 175,0000 11.500,00 2.012.500,00 3 Kawat Beton Kg 2,2500 23.000,00 51.750,00 1 Semen Kg 375,0000 1.610,00 603.750,00 2 Pasir Pasang M3 0,5200 180.000,00 93.600,00 3 Batu Pecah 1/3 M3 0,7800 300.000,00 234.000,00

    C. PERALATAND. JUMLAH (A+B+C) 3.760.428,75 E. BIAYA UMUM 376.042,88 F. HARGA SATUAN PEKERJAAN (D+E) 4.136.471,63

    URAIAN