    ANALISA HARGA SATUAN

    PEKERJAAN PEMASANGAN INSTALASI GARDU

    Belum termasuk resiko,over head,keuntungan 10 % dan PPN 10 %

    2004

    HARGA BIAYA JUMLAH

    NO JENIS PEKERJAAN SATUAN ( Rupiah ) DIBULATKAN

    ( Rupiah ) ( Rupiah )

    1 2 3 4 5

    1a PEKERJAAN PEMASANGAN INSTALASI GARDU

    1.1 Pemasangan kubikel LBS/PT/B1

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

    2 Tukang 40,500 81,000.00

    2 Pekerja 32,250 64,500.00

    - Pengadaan/ 4 Buah 3,738 14,952.00

    206,764.50 206,760.00

    1.2 Pemasangan Kubikel PGDB/PGDT

    - Tenaga Ahli 0.50 Hari 123,500 61,750.00

    4 Tukang 40,500 162,000.00

    2 Pekerja 32,250 64,500.00- Pengadaan/ 3 Buah 3,738 11,214.00

    299,464.00 299,460.00

    1.3 Pemasangan SACO

    - Tenaga Ahli 0.50 Hari 123,500 61,750.00

    4 Tukang 40,500 162,000.00

    2 Pekerja 32,250 64,500.00

    - Pengadaan/ 4 Buah 3,738 14,952.00

    303,202.00 303,200.00

    1.4 Pemasangan RMU.3 dan 4 Terminal(Panel Kontrol UPD)

    - Tenaga Ahli 0.50 Hari 123,500 61,750.00

    4 Tukang 40,500 162,000.00

    1 Pekerja 32,250 32,250.00- Pengadaan/ 4 Buah 3,738 14,952.00

    270,952.00 270,950.00

    1.5 Pemasangan RMU ( LBS,LBS,PB) ( Beton,Kiosk,Portal)

    - Tenaga Ahli 0.50 Hari 123,500 61,750.00

    4 Tukang 40,500 162,000.00

    2 Pekerja 32,250 64,500.00

    - Pengadaan/ 4 Buah 3,738 14,952.00

    303,202.00 303,200.00

    1.6 Pemasangan ( Peletakan ke posisi sebenarnya ) Trafo 100 kVA s/d 315 KVA

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

    2 Tukang 40,500 81,000.00

    3 Pekerja 32,250 96,750.00

    224,062.50 224,060.00

    1.7 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 400 kVA s/d 630 kVA

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

    2 Tukang 40,500 81,000.00

    5 Pekerja 32,250 161,250.00

    288,562.50 288,560.00

    1.8 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.000 kVA s/d 1.250 KVA

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

  • 7/26/2019 Analisa Hs Dki

    2/5

    2 Tukang 40,500 81,000.00

    8 Pekerja 32,250 258,000.00

    385,312.50 385,310.00

    1.9 Pemasangan ( Peletakan ke posisi sebenarnya )Trafo 1.600 kVA s/d 2.000 KVA

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

    2 Tukang 40,500 81,000.00

    12 Pekerja 32,250 387,000.00

    514,312.50 514,310.00

    1.10 Bracket (Kabel Tray) dan Grounding

    - Tenaga Ahli 0.25 Hari 123,500 30,875.00

    2 Tukang 40,500 81,000.00

    32,250 111,875.00 111,870.00

    1.11 Rak TR 4 Jurusan

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    2 Tukang 40,500 81,000.00

    32,250 96,437.50 96,430.00

    1.12 Rak TR 6 & 8 Jurusan

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    2 Tukang 40,500 81,000.001 Pekerja 32,250 32,250.00

    128,687.50 128,680.00

    1.13 Pemasangan LBS untuk Gardu Beton Open Type

    - Tenaga Ahli 0.38 Hari 123,500 46,312.50

    2 Tukang 40,500 81,000.00

    - Pengadaan/ 4 Pekerja 32,250 129,000.00

    256,312.50 256,310.00

    1.14 L.V.C.B Outdoor untuk gardu CANTOL

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    2 Tukang 40,500 81,000.00

    96,437.50 96,430.00

    1.15 L.V.S.B Outdoor untuk gardu Portal- Tenaga Ahli 0.13 Hari 123,500 15,437.50

    2 Tukang 40,500 81,000.00

    3 Pekerja 32,250 96,750.00

    193,187.50 193,180.00

    1.16 Single Core TM 3 x ( 1x 25 mm2 ) di MV Cell

    - Tenaga Ahli 0.67 Hari 123,500 82,333.33

    0.67 Tukang 40,500 27,000.00

    0.33 Pekerja 32,250 10,750.00

    120,083.33 120,080.00

    1.17 Single Core TM 3 x ( 1x 25 mm2 ) di Trafo

    - Tenaga Ahli 0.67 Hari 123,500 82,333.33

    0.67 Tukang 40,500 27,000.00

    0.33 Pekerja 32,250 10,750.00

    120,083.33 120,080.00

    1.18 Single Core TR 7 x ( 1x 240 mm2 ) di Trafo

    - Tenaga Ahli 0.25 Hari 123,500 30,875.00

    0.13 Tukang 40,500 5,062.50

    0.13 Pekerja 32,250 4,031.25

    39,968.75 39,960.00

    1.19 Single Core TR 7 x ( 1x 240 mm2 ) di TR

  • 7/26/2019 Analisa Hs Dki

    3/5

    - Tenaga Ahli 0.25 Hari 123,500 30,875.00

    0.13 Tukang 40,500 5,062.50

    0.13 Pekerja 32,250 4,031.25

    39,968.75 39,960.00

    1.20 Pengadaan Penyangga Kabel TM 20 kV

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    1 Tukang 40,500 40,500.00

    2 Pekerja 32,250 64,500.00

    - Pengad/Pe 1 Meter 15,600 15,600.00

    - Pengad/Pe 1 Buah 1,950 1,950.00

    137,987.50 137,980.00

    1.21 IndikatormGangguan Tanah/GFD

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    2 Tukang 40,500 81,000.00

    96,437.50 96,430.00

    1.22 Pemasangan Instalasi Heater Kubikel

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    1 Tukang 40,500 40,500.00

    55,937.50 55,930.001.23 Pengadaan K 1 Meter 2,210 2,210.00 2,210.00

    1.24 Pembersihan 2 Pekerja 26,250 52,500.00 52,500.00

    1.25 Bantuan Tena 2 Tukang 37,500 75,000.00

    Pengopersian 2 Pekerja 26,250 52,500.00

    127,500.00 127,500.00

    1.b PEKERJAAN PEMBONGKARAN INSTALASI GARDU

    1 No: 1 s/d 19 sama dengan Pekerjaan Pemasangan

    2 Pembongkaran Terminal Ind 1 Pekerja 26,250 26,250 26,250.00

    II PEMASANGAN APP TYPE KHUSUS IB,IC DAN IIF

    2.1 Dengan Pondasi

    - Galian tanah 0.13 m3 20,386 2,650.18- Pasang Bat 0.26 m3 201,578 52,410.28

    - Pasang Ang 4 Buah 3,738 14,952.00

    - Pasang Fish 4 Buah 1,430 5,720.00

    - Plesteran 1 2.27 m2 10,777 24,463.79

    - Acian Beton 2.27 m2 4,420 10,033.40

    - Jasa Pelaks 0.5 Hari 123,500 61,750.00

    3 Tukang 40,500 121,500.00

    - Jasa Pelaks 0.13 Hari 123,500 16,055.00

    2 Tukang 40,500 81,000.00

    390,534.65 390,530.00

    2.2 Dengan Strain Hook

    - Pasang Stra 4 Buah 6,500 26,000.00

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    1 Tukang 40,500 40,500.00

    2 Pekerja 32,250 64,500.00

    146,437.50 146,430.00

    III PEKERJAAN PEMELIHARAAN INSTALASI GARDU

    3.1 Kubikel TM

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    - Tukang 2 Tukang 40,500 81,000.00

  • 7/26/2019 Analisa Hs Dki

    4/5

    - Majun 0.5 Kg 8,000 4,000.00

    - YC.8513 ( M 0.5 Liter 75,000 37,500.00

    - Pasline Puti 0.25 Kg 87,500 21,875.00

    159,812.50 159,810.00

    3.2 Kubikel pengukuran ( PGDB )

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    - Tukang 2 Tukang 40,500 81,000.00

    - Majun 0.5 Kg 8,000 4,000.00

    - YC.8513 ( M 0.5 Liter 75,000 37,500.00

    - Pasline Puti 0.25 Kg 87,500 21,875.00

    159,812.50 159,810.00

    3.3 Trafo Distribusi

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50

    - Tukang 2 Tukang 40,500 81,000.00

    - Majun 0.5 Kg 8,000 4,000.00

    - YC.8513 ( M 0.5 Liter 75,000 37,500.00

    137,937.50 137,930.00

    3.4 Rak TR

    - Tenaga Ahli 0.13 Hari 123,500 15,437.50- Tukang 1 Tukang 40,500 40,500.00

    - Majun 0.25 Kg 8,000 2,000.00

    - YC.8513 ( M 0.5 Liter 75,000 37,500.00

    - Pasline Puti 0.25 Kg 87,500 21,875.00

    117,312.50 117,310.00

    3.5 Detektor gangguan tanah/GFD

    - Tukang 1 Tukang 40,500 40,500.00

    - YC.8513 ( M 0.5 Kg 75,000 37,500.00

    78,000.00 78,000.00

    3.6 Pembersihan Ruangan Gardu

    - Alat Vacum 1 Buah 13,000 13,000.00

    - Bahan Baka 1 Liter 2,600 2,600.00

    - Instalator 1 Tukang 40,500 40,500.00

    56,100.00 56,100.00

    IV PEKERJAAN LAIN - LAIN

    4.1 Pemasangan Gardu Besi/Kios berikut Pondasi

    a Pekerjaan Pe 1 Lokasi 130,000 130,000.00

    b Pasang Boupl 17 Meter 8,398 142,766.00

    c Galian Tanah 9 m3 20,386 183,474.00

    d Urugan Pasir 0.5 m3 49,842 24,921.00

    e Pondasi Beto 4.6 m3 689,193 3,170,287.80

    f Pantek Pipa 4 Batang 130,000 520,000.00

    g Plesteran 1:2 35 m2 10,738 375,830.00

    h Acian Beton 35 m2 4,420 154,700.00

    i Pasang Arde 10 Kg 2,925 29,250.00

    j Beton Lantai 6 m2 23,375 140,250.00

    k Pekerjaan Stel Kios

    - Pelaksana 1 Ten.Ahl.Md 123,500 123,500.00

    2 Tukang 40,500 81,000.00

    3 Pekerja 32,250 96,750.00

    l Pembuangan 9 M3 21,125 190,125.00

  • 7/26/2019 Analisa Hs Dki

    5/5

    Angkutan Truk dengan Kap.3.m3 5,362,853.80 5,362,850.00

    2 Pemasangan Gardu Kios Compact berikut Pondasi

    a Pekerjaan Pe 1 Lokasi 130,000 130,000.00

    b Pasang Boupl 9 Meter 8,398 75,582.00

    c Galian Tanah 4.5 m3 7,878 35,451.00

    d Urugan Pasir 0.25 m3 49,842 12,460.50

    e Pondasi Beto 2.3 m3 689,193 1,585,143.90

    f Pantek Pipa 4 Batang 130,000 520,000.00

    g Plesteran 1:2 18 m2 10,738 193,284.00

    h Acian Beton 18 m2 4,420 79,560.00

    i Pasang Arde 10 Kg 2,925 29,250.00

    j Beton Lantai 3 m2 23,375 70,125.00

    k Pekerjaan Stel Kios

    - Pelaksana 1 Ten.Ahl.Md 123,500 123,500.00

    2 Tukang 40,500 81,000.00

    6 Pekerja 32,250 193,500.00

    l Sewa Mobil C 0.88 Hari 112,500 98,437.50

    m Pembuangan 4.5 Rit 0.00

    Angkutan Truk dengan Kap.3 m3 3,227,293.90 3,227,290.00

    3 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m 39,000,000.00

    dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2) 650,000.00

    4 Pengadaan Gardu Susun GRC 400 KVA Kososng (1,5x2,5x3,9)m 43,225,000.00

    dan saluran kabel GRC 630 KVA Kosong (1,5x2,5x4,2) 650,000.00