Analisa Harga Satuan1

22
Uraian Kegiatan Koefisien Pemasangan Konektor Kabel Upah : Tukang Listrik 0.01 Bahan / Material Konektor Kabel 1 Pemasangan Servis Kabel Upah : Tukang Listrik 0.01 Bahan / Material Service Kabel / Suspension Klem 1 Pemasangan / Penarikan Kabel Twisted 2 x 16 mm Upah : Pemasangan dan Penarikan Kabel 1 Bahan / Material KabelTwiste 2x16mm 1 Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m) Upah : Pemasangan dan Penarikan Kabel 2.5 Bahan / Material Kabel NYM 2 x 2.5 mm 2.5 Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m) Upah : Pemasangan dan Penarikan Kabel 3 Bahan / Material Kabel NYM 2 x 2.5 mm 3 Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m)

description

analisa

Transcript of Analisa Harga Satuan1

Page 1: Analisa Harga Satuan1

Uraian Kegiatan Koefisien Satuan

Pemasangan Konektor KabelUpah :Tukang Listrik 0.01

Bahan / MaterialKonektor Kabel 1

Pemasangan Servis KabelUpah :Tukang Listrik 0.01

Bahan / MaterialService Kabel / Suspension Klem 1

Pemasangan / Penarikan Kabel Twisted 2 x 16 mmUpah :Pemasangan dan Penarikan Kabel 1

Bahan / MaterialKabelTwiste 2x16mm 1

Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m)Upah :Pemasangan dan Penarikan Kabel 2.5

Bahan / MaterialKabel NYM 2 x 2.5 mm 2.5

Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m)Upah :Pemasangan dan Penarikan Kabel 3

Bahan / MaterialKabel NYM 2 x 2.5 mm 3

Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m)

Page 2: Analisa Harga Satuan1

Upah :Pemasangan dan Penarikan Kabel 4

Bahan / MaterialKabel NYM 2 x 2.5 mm 4

Instalasi 1 titik Lampu PJU (Tarikan Udara 7 m)Upah :Pemasangan dan Penarikan Kabel 7

Bahan / MaterialKabel NYM 2 x 2.5 mm 7

Instalasi 1 titik Lampu PJU (Tarikan Udara 10 m)Upah :Pemasangan dan Penarikan Kabel 10

Bahan / MaterialKabel NYM 2 x 2.5 mm 10

Pemasangan Ornamen Lampu PJU Panjang 1.5 mUpah :Mandor 0.125Tukang Listrik 0.2Pekerja Terampil 0.6

Bahan / MaterialPipa Galvanish Dim. 2'' 1.5Besi Beugel/Baut ( ornamen ) 2Stiker Reflektive 0.0508Roll Pipa 2" 1

Sewa PeralatanSewa Alat Bantu Penerangan Jalan Umum (PJU) 2

Pemasangan Ornamen Lampu PJU panjang 3 mUpah :Mandor 0.125Tukang Listrik 0.2Pekerja Terampil 0.6

Page 3: Analisa Harga Satuan1

Bahan / MaterialPipa Galvanish Dim. 2'' 3Besi Beugel/Baut ( ornamen ) 2Plat Besi Tb. 5 mm 2.3815Papan Nama 2Roll Pipa 2" 1

Sewa PeralatanSewa Alat Bantu Penerangan Jalan Umum (PJU) 2

Pemasangan Panel Lampu PJU - 1 Phase 2.200 VAUpah :Perakitan Panel PJU 1Pemasangan Panel PJU 1

Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 4MCB C60N 16 A 1 Phase 2Magnet Kontaktor LC-1 D12 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Lampu PJU - 1 Phase 3.500 VAUpah :Perakitan Panel PJU 1Pemasangan Panel PJU 1

Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 1MCB C60N 10 A 1 Phase 3MCB C60N 40 A 1 Phase 2Magnet Kontaktor LC-1 D12 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1

Page 4: Analisa Harga Satuan1

Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Lampu PJU - 1 Phase 5.500 VAUpah :Perakitan Panel PJU 1Pemasangan Panel PJU 1

Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 1MCB C60N 16 A 1 Phase 3MCB C60N 40 A 1 Phase 2Magnet Kontaktor LC-1 D40 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1

Pemasangan Panel Meter 1 PhaseUpah :Pemasangan Panel 1

Bahan/Material:Box Panel Meter 1 Phase 1Kabel Glen / Water Mur PG-7 1Kabel Glen / Water Mur PG-21 2Besi Beugel + Mur + Baut + Ring 1

Pemasangan Instalasi Pelaluan Arde Panel MeterUpah:Pekerja / Buruh Tak Terampil 0.036

Page 5: Analisa Harga Satuan1

Bahan/Material:Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 2Keni Pipa PVC 1/2" (Putih) 2Kabel 10 mm 2

Upah:Mandor 0.25Tukang Listrik 0.25Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:

1

Sewa Peralatan :Sewa Alat Bantu Penerangan Jalan Umum (PJU) 1

Pondasi PJUUpah:Mandor 0.065Kepala Tukang Batu 0.03Tukang Las 1.03Tukang Batu 0.125Pekerja / Buruh Tak Terampil 0.25

Bahan/Material:Angker Besi Dim. 19 mm 15.1271Besi Beton Polos Dim. 10 mm 2.3663Kayu Meranti Bekesting 0.0144Paku Reng 0.125Galian Tanah Keras 0.24Pekerjaan beton (1 pc : 2 ps : 3 kr) 0.24Pasir Cor/Beton 0.024Mur + Ring u/ Angker 4

Sewa Peralatan :Sewa Alat Bantu (1 Set @ 3 Alat ) 0.1767Sewa Vibrator Roller 0.0076Sewa Concrete Mixer 0.0076

Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor

Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor 18 - 20 μf

Page 6: Analisa Harga Satuan1

Pemasangan Tiang TanamUpah :Mandor 0.13Tukang Listrik 0.25Pekerja Terampil 0.25Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:Tiang tanam 1

Sewa Peralatan :Sewa Crane 0.5

Pemasangan Tiang Biasa 7 mUpah :Mandor 0.13Tukang Listrik 0.25Pekerja Terampil 0.25Pekerja / Buruh Tak Terampil 0.75

Bahan/Material:Tiang Biasa 5 m Cab. 2 1

Sewa Peralatan :Sewa Crane 0.5

Page 7: Analisa Harga Satuan1

1.1

58,000 580.00 Jumlah 580.00

18,000 18,000.00 Jumlah 18,000.00

Nilai Total 18,580.00

58,000 580.00 Jumlah 580.00

22,000 22,000.00 Jumlah 22,000.00

Nilai Total 22,580.00

5,000 5,000.00 Jumlah 5,000.00

10,000 10,000.00 Jumlah 10,000.00

Nilai Total 15,000.00

11.1

50,000 125,000.00 Jumlah 125,000.00

19,000 47,500.00 Jumlah 47,500.00

Nilai Total 172,500.00

50,000 150,000.00 Jumlah 150,000.00

19,000 57,000.00 Jumlah 57,000.00

Nilai Total 207,000.00

12.1

Harga Satuan (Rp.)

Jumlah Harga (Rp.)

Page 8: Analisa Harga Satuan1

12.1

50,000 200,000.00 Jumlah 200,000.00

19,000 76,000.00 Jumlah 76,000.00

Nilai Total 276,000.00

13.1

50,000 350,000.00 Jumlah 350,000.00

19,000 133,000.00 Jumlah 133,000.00

Nilai Total 483,000.00

14.1

50,000 500,000.00 Jumlah 500,000.00

19,000 190,000.00 Jumlah 190,000.00

Nilai Total 690,000.00

5.1

100,000 12,500.00 58,000 11,600.00 45,000 27,000.00

Jumlah 51,100.00

220,000 330,000.00 32,000 64,000.00 350,000 17,780.00 60,000 60,000.00

Jumlah 471,780.00

100,000 200,000.00 Jumlah 200,000.00

Nilai Total 722,880.00

6.1

100,000 12,500.00 58,000 11,600.00 45,000 27,000.00

Jumlah 51,100.00

Page 9: Analisa Harga Satuan1

6.1 220,000 660,000.00 32,000 64,000.00 22,000 52,393.00 75,000 150,000.00 60,000 60,000.00

Jumlah 986,393.00

100,000 200,000.00 Jumlah 200,000.00

Nilai Total 1,237,493.00

7.1

300,000 300,000.00 510,000 510,000.00

Jumlah 810,000.00

2,000,000 2,000,000.00 74,000 296,000.00 74,000 148,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00 30,000 120,000.00 17,500 52,500.00 6,000 12,000.00 7,500 22,500.00 11,000 33,000.00 150,000 150,000.00 32,000 32,000.00

Jumlah 4,333,000.00 Nilai Total 5,143,000.00

8.1

300,000 300,000.00 510,000 510,000.00

Jumlah 810,000.00

2,000,000 2,000,000.00 74,000 74,000.00 74,000 222,000.00 240,000 480,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00

Page 10: Analisa Harga Satuan1

30,000 120,000.00

8.1

17,500 52,500.00 6,000 12,000.00 7,500 22,500.00 16,000 48,000.00 30,000 30,000.00 32,000 32,000.00

Jumlah 4,560,000.00 Nilai Total 5,370,000.00

5.c

300,000 300,000.00 510,000 510,000.00

Jumlah 810,000.00

2,000,000 2,000,000.00 74,000 74,000.00 74,000 222,000.00 240,000 480,000.00 1,000,000 1,000,000.00 442,000 442,000.00 25,000 25,000.00 30,000 120,000.00 17,500 52,500.00 6,000 12,000.00 7,500 22,500.00 16,000 48,000.00 30,000 30,000.00 32,000 32,000.00

Jumlah 4,560,000.00 Nilai Total 5,370,000.00

6.c

510,000 510,000.00 Jumlah 510,000.00

480,000 480,000.00 25,000 25,000.00 30,000 60,000.00 32,000 32,000.00

Jumlah 597,000.00 Nilai Total 1,107,000.00

7.c

40,000 1,440.00

Page 11: Analisa Harga Satuan1

Jumlah 1,440.00

7.c 17,500 35,000.00 6,000 12,000.00 11,000 22,000.00

Jumlah 69,000.00 Nilai Total 70,440.00

2.b,2.c

100,000 25,000.00 58,000 14,500.00 40,000 30,000.00

Jumlah 69,500.00

1,250,000 1,250,000.00 Jumlah 1,250,000.00

100,000 100,000.00 Jumlah 100,000.00

Nilai Total 1,419,500.00

3.II.B

100,000 6,500.00 67,000 2,010.00 58,000 59,740.00 58,000 7,250.00 40,000 10,000.00

Jumlah 85,500.00

30,000 453,813.00 28,000 66,256.40 3,200,000 46,080.00 24,000 3,000.00 50,000 12,000.00 40,000 9,600.00 175,000 4,200.00 15,000 60,000.00

Jumlah 654,949.40

20,000 3,534.00 350,000 2,660.00 325,000 2,470.00

Jumlah 8,664.00

Page 12: Analisa Harga Satuan1

Nilai Total 749,113.40

3.II.B

1.2.B

100,000 13,000.00 58,000 14,500.00 45,000 11,250.00 40,000 30,000.00

Jumlah 68,750.00

750,000 750,000.00 Jumlah 750,000.00

200,000 100,000.00 Jumlah 100,000.00

Nilai Total 918,750.00

2.2.b

100,000 13,000.00 58,000 14,500.00 45,000 11,250.00 40,000 30,000.00

Jumlah 68,750.00

1,670,000 1,670,000.00 Jumlah 1,670,000.00

250,000 125,000.00 Jumlah 125,000.00

Nilai Total 1,863,750.00

Page 13: Analisa Harga Satuan1

Uraian Kegiatan Koefisien Satuan

Pemasangan Konektor KabelUpah :Tukang Listrik 0.01Bahan / MaterialKonektor Kabel 1Pemasangan Servis KabelUpah :Tukang Listrik 0.01Bahan / MaterialService Kabel / Suspension Klem 1Pemasangan / Penarikan Kabel Twisted 2 x 16 mmUpah :Pemasangan dan Penarikan Kabel 1Bahan / MaterialKabel NYM 2 x 2.5 mm 1Instalasi 1 titik Lampu PJU (Tarikan Udara 2.5 m)Upah :Pemasangan dan Penarikan Kabel 2.5Bahan / MaterialKabel NYM 2 x 2.5 mm 2.5Instalasi 1 titik Lampu PJU (Tarikan Udara 3 m)Upah :Pemasangan dan Penarikan Kabel 3Bahan / MaterialKabel NYM 2 x 2.5 mm 3Instalasi 1 titik Lampu PJU (Tarikan Udara 4 m)Upah :Pemasangan dan Penarikan Kabel 4Bahan / MaterialKabel NYM 2 x 2.5 mm 4Instalasi 1 titik Lampu PJU (Tarikan Udara 7 m)Upah :Pemasangan dan Penarikan Kabel 7Bahan / MaterialKabel NYM 2 x 2.5 mm 7Instalasi 1 titik Lampu PJU (Tarikan Udara 10 m)Upah :Pemasangan dan Penarikan Kabel 10Bahan / MaterialKabel NYM 2 x 2.5 mm 10Pemasangan Ornamen Lampu PJU Panjang 1.5 m

Page 14: Analisa Harga Satuan1

Upah :Mandor 0.125Tukang Listrik 0.2Pekerja Terampil 0.6Bahan / MaterialPipa Galvanish Dim. 2'' 1.5Besi Beugel/Baut ( ornamen ) 2Stiker Reflektive 0.0508Roll Pipa 2" 1Sewa PeralatanSewa Alat Bantu Penerangan Jalan Umum (PJU) 2Pemasangan Ornamen Lampu PJU panjang 3 mUpah :Mandor 0.125Tukang Listrik 0.2Pekerja Terampil 0.6Bahan / MaterialPipa Galvanish Dim. 2'' 3Besi Beugel/Baut ( ornamen ) 2Plat Besi Tb. 5 mm 2.3815Papan Nama 2Roll Pipa 2" 1Sewa PeralatanSewa Alat Bantu Penerangan Jalan Umum (PJU) 2Pemasangan Panel Lampu PJU - 1 Phase 2.200 VAUpah :Perakitan Panel PJU 1Pemasangan Panel PJU 1Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 4MCB C60N 16 A 1 Phase 2Magnet Kontaktor LC-1 D12 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1Pemasangan Panel Lampu PJU - 1 Phase 3.500 VAUpah :Perakitan Panel PJU 1

Page 15: Analisa Harga Satuan1

Pemasangan Panel PJU 1Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 1MCB C60N 10 A 1 Phase 3MCB C60N 40 A 1 Phase 2Magnet Kontaktor LC-1 D12 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1Pemasangan Panel Lampu PJU - 1 Phase 5.500 VAUpah :Perakitan Panel PJU 1Pemasangan Panel PJU 1Bahan/Material:Panel PJU 1MCB C60N 6 A 1 Phase 1MCB C60N 16 A 1 Phase 3MCB C60N 40 A 1 Phase 2Magnet Kontaktor LC-1 D40 1Time Switch (Sul 181 h/Sul 181 d) 1Kabel Glen / Water Mur (PG-7) 1Kabel Glen / Water Mur (PG-21) 4Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 3Keni Pipa PVC 1/2" (Putih) 2Stenless Tie + Clip (Yuke) + Ring 3Kabel 10 mm 3Grounding Roud (Arde) 16 mm 1Besi Beugel + Mur + Baut + Ring 1Pemasangan Panel Meter 1 PhaseUpah :Pemasangan Panel 1Bahan/Material:Box Panel Meter 1 Phase 1Kabel Glen / Water Mur PG-7 1Kabel Glen / Water Mur PG-21 2Besi Beugel + Mur + Baut + Ring 1Pemasangan Instalasi Pelaluan Arde Panel MeterUpah:

Page 16: Analisa Harga Satuan1

Pekerja / Buruh Tak Terampil 0.036Bahan/Material:Pipa PVC Pelaluan Arde Dim. 1/2" (Putih) 2Keni Pipa PVC 1/2" (Putih) 2Kabel 10 mm 2

Upah:Mandor 0.25Tukang Listrik 0.25Pekerja / Buruh Tak Terampil 0.75Bahan/Material:

1Sewa Peralatan :Sewa Alat Bantu Penerangan Jalan Umum (PJU) 1Pondasi PJU BuahUpah:Mandor 0.065Kepala Tukang Batu 0.03Tukang Las 1.03Tukang Batu 0.125Pekerja / Buruh Tak Terampil 0.25Bahan/Material:Angker Besi Dim. 19 mm 15.1271Besi Beton Polos Dim. 10 mm 2.3663Kayu Meranti Bekesting 0.0144Paku Reng 0.125Galian Tanah Keras 0.24Pekerjaan beton (1 pc : 2 ps : 3 kr) 0.24Pasir Cor/Beton 0.024Mur + Ring u/ Angker 4Sewa Peralatan :Sewa Alat Bantu (1 Set @ 3 Alat ) 0.1767Sewa Vibrator Roller 0.0076Sewa Concrete Mixer 0.0076Pemasangan Tiang Tanam BuahUpah :Mandor 0.13Tukang Listrik 0.25Pekerja Terampil 0.25Pekerja / Buruh Tak Terampil 0.75Bahan/Material:Tiang tanam 1Sewa Peralatan :

Pemasangan Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor

Lampu HPS 150 W/220 V Lengkap Armateur, Balast, Ignitor & Capasitor 18 - 20 μf

Page 17: Analisa Harga Satuan1

Sewa Crane 0.5Pemasangan Tiang Biasa 7 mUpah :Mandor 0.13Tukang Listrik 0.25Pekerja Terampil 0.25Pekerja / Buruh Tak Terampil 0.75Bahan/Material:Tiang Biasa 5 m Cab. 2 1Sewa Peralatan :Sewa Crane 0.5

Page 18: Analisa Harga Satuan1

70000 700.00

-

-

-

-

19000 19,000.00

-

-

-

-

-

-

-

-

-

-

Harga Satuan (Rp.)

Jumlah Harga (Rp.)

Page 19: Analisa Harga Satuan1

- - -

- - - -

-

- - -

- - - - -

-

- -

- 74000 296,000.00 74000 148,000.00

- - - - - - - -

150000 150,000.00 -

-

Page 20: Analisa Harga Satuan1

-

- - - - - - - - - - - - - -

- -

- - - - - - - - - - - - - -

-

- - - -

Page 21: Analisa Harga Satuan1

-

- - -

- - -

-

-

- - - - -

- - - - - - - -

- - -

- - - -

-

Page 22: Analisa Harga Satuan1

-

- - - -

-

-