PT. DREAMWEAR PROSEDUR STANDAR OPERASI
PRODUKSI GARMENT
SOP - PRO - 01
BPM: P4 - PRODUCE GARMENT
DISIAPKAN OLEH
DIPERIKSA OLEH
DISETUJUI OLEH
TANGGAL BERLAKU
MANAGEMENT REPRESENTATIVE
MR. YANG
1 Oct 2009
JUDUL
NO. DOKUMEN
REFERENSI
MS. CHOI
ALUR PROSES / PROCESS CHART DOKUMEN KETERANGAN / REMARKS
0REVISI HALAMAN 1/3
Check Production Schedule for style
& Line AllocationP401 Prod
Prod
Schedule
Request Fabric to Material
Warehouse & Marker to R&DP402
Prod
(Cut)
Spread fabric according to marker &
layer standard of each fabricP403
Prod
(Cut)Marker
Cut fabric, bundle & labeling, readyto supply to sewing lines
P404 Prod(Cut)
Cutting report
Request fabric to Cutting,
Accessories to WH, pattern to R&D,
prepare machines & operators
P405Prod
(Sew)
MaterialRequest
Load materials to production linesP406 Prod(Sew)
Sew garment according to sample &
other specificationsP407
Prod
(Sew)
Mat’l Req, Patrn
Req, Prod L/out,Work sheet,
Swatch Card
Prod
Worksheet,
Swatch Card
TO
P407
START
-
8/18/2019 2.CONTOH_sopproduksigarmentflowchart
2/3
PT. DREAMWEAR PROSEDUR STANDAR OPERASI
PRODUKSI GARMENT
SOP - PRO - 01
BPM: P4 - PRODUCE GARMENT
DISIAPKAN OLEH
DIPERIKSA OLEH
DISETUJUI OLEH
TANGGAL BERLAKU
MANAGEMENT REPRESENTATIVE
MR. YANG
1 Oct 2009
JUDUL
NO. DOKUMEN
REFERENSI
MS. CHOI
ALUR PROSES / PROCESS CHART DOKUMEN KETERANGAN / REMARKS
0REVISI HALAMAN 2/3
FR
P407
Inspect panels joins
& sewn garmentP408 QA
In-Line QC
Check Sheet
OK? Go to P407
ProdWorksheet,
Swatch Card
Pass Garments through metal
detectorP412 QA
OK?
N
Y
Inspect garments during & after
Finishing ProcessP411 QA
In-Line QCCheck Sheet
Y
N
Metal
Detector
Report
Trim unnecessary threads, clean &
tidy up garmentsP409 FIN
Apply Garment AccessoriesP410 FIN
TO
P413
-
8/18/2019 2.CONTOH_sopproduksigarmentflowchart
3/3
PT. DREAMWEAR PROSEDUR STANDAR OPERASI
PRODUKSI GARMENT
SOP - PRO - 01
BPM: P4 - PRODUCE GARMENT
DISIAPKAN OLEH
DIPERIKSA OLEH
DISETUJUI OLEH
TANGGAL BERLAKU
MANAGEMENT REPRESENTATIVE
MR. YANG
1 Oct 2009
JUDUL
NO. DOKUMEN
REFERENSI
MS. CHOI
ALUR PROSES / PROCESS CHART DOKUMEN KETERANGAN / REMARKS
0REVISI HALAMAN 3/3
Pack garmentsP413 PAC
Pre-Final InspectionP414 QASpec Sheets,Insp Reports
Final Inspection by Buyer’s QCP416 BUY
Spec Sheets,
Insp Report
Packing List
FR
P412
OK?
Y
N
OK?
Y
N
Corrective ActionsP417 ANY
P4 ends, P5 Starts :
Ship Garment ProcessP5
FGWH, MKT,PPIC, EXM
STOP
BUY : Buyer
FGWH : Finished Goods
Warehouse