KEGIATAN : PERENCANAAN RENOVASI GEDUNGPEKERJAAN : RENOVASI RUANG TUNGGU SPESIMEN
: PENINGKATAN SELASAR: PENINGKATAN TEMPAT PARKIR: RENOVASI PAGAR PEMBATAS LAB. DAN RUMAH DINAS: PEMASANGAN KERAMIK DINDING DAN MEJA PENERIMA SAMPEL LAB. PATOLOGI
LOKASI : BASO, KAB. AGAMTAHUN : 2014
NO. JUMLAH (Rp.)
a c
A. RENOVASI RUANG TUNGGU SPESIMENI PEKERJAAN PENDAHULUAN 522.885,00RpII PEKERJAAN PONDASI 4.071.595,77RpIII PEKERJAAN BETON BERTULANG 10.236.546,64RpIV PEKERJAAN KUDA KUDA DAN ATAP 12.931.151,85RpV PEKERJAAN DINDING 12.217.177,06RpVI PEKERJAAN PLAFOND 3.416.685,91RpVII PEKERJAAN LANTAI 4.851.810,95RpVIII PEKERJAAN PINTU DAN JENDELA 10.277.225,09RpIX PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PERLENGKAPAN DALAM 6.409.733,00RpX PEKERJAAN PENGECATAN 2.238.869,88Rp
67.173.681,15RpB. PENINGKATAN SELASARI PEKERJAAN PENDAHULUAN 1.305.029,00RpII PEKERJAAN PONDASI 8.407.383,32RpIII PEKERJAAN BETON BERTULANG DAN TIANG 6.754.768,92RpIV PEKERJAAN KUDA KUDA DAN ATAP 21.887.568,01RpV PEKERJAAN LANTAI 16.658.697,46RpVI PEKERJAAN MEKANIKAL ELEKTRIKAL 2.755.000,00RpVII PEKERJAAN PENGECATAN 2.339.836,40Rp
60.108.283,11RpC. PENINGKATAN TEMPAT PARKIRI PEKERJAAN PENDAHULUAN 2.651.174,69RpII PEKERJAAN PONDASI 1.036.870,95RpIII PEKERJAAN TIANG 192.610,00RpIV PEKERJAAN KUDA KUDA DAN ATAP 4.991.146,49RpV PEKERJAAN LANTAI 1.369.824,17RpVI PEKERJAAN PENGECATAN 929.591,63Rp
11.171.217,93RpD. RENOVASI PAGAR PEMBATAS LAB. DAN RUMAH DINASI PEKERJAAN PENDAHULUAN 797.406,50RpII PEKERJAAN PONDASI 4.806.933,45RpIII PEKERJAAN PAGAR 29.470.150,00Rp
35.074.489,95Rp
REKAPITULASI BIAYA
URAIAN PEKERJAAN
b
JUMLAH A
JUMLAH B
JUMLAH C
JUMLAH D
Page 1
![Page 2: 2.B. REKAPITULASI.pdf](https://reader036.fdokumen.com/reader036/viewer/2022072002/563db971550346aa9a9d64dc/html5/thumbnails/2.jpg)
NO. JUMLAH (Rp.)
a c
URAIAN PEKERJAAN
bE. PEMASANGAN KERAMIK DINDING DAN MEJA PENERIMA SAMPEL LAB. PATOLOGII MEJA PENERIMA SAMPEL 1.266.292,58RpII PEMASANGAN KERAMIK DINDING LAB. PATOLOGI 7.023.415,50Rp
8.289.708,08Rp
181.817.380,22Rp
18.181.738,02Rp
199.999.118,24Rp
199.999.000,00Rp
Terbilang :
Baso, 8 Agustus 2014DITAWAR OLEH
CV. HAMDI PUTRA
AGUS SALIMDIREKTUR
DIBULATKAN
JUMLAH
PPN 10 %
JUMLAH
JUMLAH E
Seratus Sembilan Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Sembilan Ribu Rupiah