1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo...

31
1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging

Transcript of 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo...

Page 1: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

1

LIPPO CIKARANG Wasted Water Treatment

Plant

Saputra Sibarani

Presented byAndreas Alfredo Sigalingging

Page 2: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

2

Content

IntroductionIntroduction

General DescriptionGeneral DescriptionOf Lippo CikarangOf Lippo Cikarang

Wasted Water Treatment PlantWasted Water Treatment Plant

MeasurementMeasurement

Page 3: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

3

INTRODUCTION

Lippo Cikarang is Industrial Area managed by PT Lippo Cikarang.

Based on Government Rules, Industrial Area must have WWTP to guarantee health and clean area.

Page 4: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

4

Data

o Flow Rateo Temperatur

eo pHo Colouro CODo BODo SS

o Lippo Cikarang Description

o WWTP Operational Datao WWTP Unit Dimensions

PrimaryPrimary Secondary Secondary

Page 5: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

5

City of Lippo Cikarang

Page 6: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

6

Public Area

Comercial Area

Public Facility

Industry Area

WWTP

Page 7: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

7

Wasted Water Treatment Management

Pretreatment

Pretreatment

Customer

Collection & Pumping

MH

City Management

Treatment

WWTP

City Management

CikaduRiver

EffluenNetwork

pipePump station

Monitoring

Page 8: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

8

Standard of Effluen of PT Lippo Cikarang

suspended solid : 200 mg/l pH : 6.0-9.0 COD : 1000 mg/l BOD : 600 mg/l

Standard of effluent from industry to be treatedAt WWTP of Lippo Cikarang:

Page 9: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

9

Treatment Processes

First Stage (Equalization & neutralization)

Second Stage (Aeration CMAS & sedimentation)

Third Stage (Coagulation-flocculation, post-sedimentation)

Mud Treatment Stage (Thickener & filter belt press)

Page 10: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

10

Scheme of WWTP

d

a

bc

e

j

I

II

kPPLI

sungai

f gih

I : Inlet I with screenII : Inlet II with screena : Equalization Ib : Equalization IIc: : Neutralizationd : Aeration Tank CMASe : Sedimentation

f : pH adjustmentg : Coagulationh : Flocculationi : Post-sedimentationj : Thickenerk : Belt Press Filter

/Cikadu River

Page 11: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

11

To overcome shock loading in term of Quantity and quality.

Equalization I absorbs wasted water from clothing and food industries. Flow rate is 50 m3/hour and the Wasted Water are hold inside for 1.82 days.

Equalization Unit

Page 12: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

12

Equalization II absorbs wasted waters from other sources. And then mix together with wasted water from equalization I. Flow rate is 119 m3/hour and holding time 0,77 day.

Dimensions :Length : 35 m Depth : 4,5 m (1m freeboard)Volume : 2187,5 m3

Page 13: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

13

Equalization I

Page 14: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

14

Equalization II

Page 15: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

Aeration CMAS

15

oxygenation hydrodynamic purpose – wastewater mixing by

air bubbles ensure regardful and intensive contact of micro-organisms with oxygen and purified water (organic pollution)

Dimentions :Length : 76 m Width : 33 mDepth : 4,5 m (1m freeboard)Volume : 4838,75 m3

Page 16: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

16

Aeration Pool (CMAS)

Page 17: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

17

Scum in Aeration

Page 18: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

Sedimentation

18

Sedimentation Pool is part of Biologic Treatment to sedimentate Biologic Muds.

Dimensions :Diameter : 17 mDepth : 3,5 m (1m freeboard)Volume : 680,6 m3

Page 19: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

19

Sedimentation Pool

Page 20: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

20

Third Stage(coagulation-floculation and post-sedimentation)

1. Coagulation is process to separate Pollutant in suspended form or Coloid, by adding Coagulant.

2. Flocculation is process to form bigger floc by adding Floculant so that it can be easily sedimentated.

3. Post-sedimentation is process to sedimentate chemical mud resulted from Coagulation and Floculation process.

Chemical used:Coagulant : alumFloculant : polimer

Page 21: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

21

Coagulation

Page 22: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

22

Flocculation

Page 23: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

23

Post-sedimentation

Page 24: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

Thickener

24

Thickener Unit is used for thickening process of mud in Sedimentation Pool.

Dimensions :Diameter : 12,5 mDepth : 3,5 m (1m freeboard)Volume : 368 m3

Page 25: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

25

Thickener

Page 26: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

Belt press filtering

26

Belt Press Filter is used for Mud Dewatering Process (decreasing water concentration) so that the muds can be easily and safely threw out in solid cake form.

Dimensions :Length : 8 m Width : 6 mSludge feed pump : 3-13 m3/dWash water pump : 12 m3/d

Page 27: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

27

Belt Press Filter

Page 28: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

28

Baku Mutu Air Limbah

Parameter Maximum

(mg/l)Maximum Loads

(kg/day. Ha)

BOD5 50 4.3

COD 100 8.6

TSS 200 17.2

pH 6.0-9.0

Maximum flow rate is 1 L/detik. Ha of used area.

Effluen quality standard for industrial WWTP according To government rules (KepMen LH No 03/MENLH/1998)

Page 29: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

29

Measurement Results

Parameter Unit Influent Ekualisation

IIInfluentaeration

Aeration Pool

RASEffluent Aeration

Effluent

Temperature 0C 25.1 26.1 29.9 26.3 26.8 29.2 26

pH 9.12 8.81 9.13 7.75 7.77 8.01 7.83

Color Pt-Co 2724 347 484

TSS mg/l 867 484 597 5790 15780 10232 153

BOD5 mg/l 700 344 470 525 330 37

COD mg/l 2058 949 1013 2208 4676 2044 201

SV-30ml/

1000ml

420

Thursday, 19 Juli 2007Thursday, 19 Juli 2007Primary Data

Page 30: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

30

Efficiency

Parameter UnitTreatment Load

Efficiency

Influent Effluent

Colour Pt-Co 2724 484 82%

SS mg/l 867 153 82%

BOD5 mg/l 700 37 95%

COD mg/l 2058 201 90%

Efficiency = %100inf

inf

luen

effluenluen

Page 31: 1 LIPPO CIKARANG Wasted Water Treatment Plant Saputra Sibarani Presented by Andreas Alfredo Sigalingging.

THANK YOU!!!!TERIMA KASIH

31