Post on 22-Jan-2023
Uttar Pradesh, the most populous state of Nation is served
by North Central Railway along with Northern, North Eastern
and East Central Railways. Indian Railways (IR) plays a very
important role in development of the state and provides
connectivity for freight and passengers, including international
tourists. IR has a history of more than 160 years in the state and
has the highest route kilometers - 9100 route kilometers - within
it, which is 14% of entire railway network. IR has made Uttar
Pradesh proud by giving it Nation's first semi high speed train
Gatimaan Express, which initially ran between Agra and Delhi.
It has now been extended upto Jhansi with effect from
01.04.2018 - a move that will boost tourism in bundelkhand
region of Uttar Pradesh. Efforts for further development of
railway infrastructure in Uttar Pradesh have been intensified in
last four years with 376% more investment in comparison to
previous years. Results of such a massive investment are
becoming visible with enhanced infrastructure and modern
passenger amenities. Soon the era of congestion and
inconvenience will be a matter of past and a new Railway
equipped with state-of-the-art facilities will be able to serve the
citizens with greater level of satisfaction. The longest stretch of
the under construction Eastern Dedicated Freight Corridor i.e.
almost 57% of the entire length lies in Uttar Pradesh from
In this brochure, we have compiled the important
contributions and achievements of Indian Railways in the
development of the KANPUR constituency of Uttar Pradesh in
the last four years. I hope that it will serve as a ready reckoner
for those eager to know about the role of Railways in the
development of this constituency.
It may be noted that the budgets allocated to various
projects are not apportioned constituency wise but reflect the
cost of the project.
Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad.
M. C. ChauhanGeneral Manager
North Central Railway
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTS:
Kanpur Cantonment, Arya Nagar, Govind Nagar, Sishamau, Kidwai Nagar.
B. WORKS COMPLETED IN LAST FOUR YEARS:
1. INFRASTRUCTURAL DEVELOPMENT
Kanpur Anwarganj- Kalyanpur Electrification (10.02 km) at Cost of 2.06 Crore
Road Over Bridge at Level Crossing No-83D at Km-101851-53 at a cost of Rs. 22.15 Crore.
Augmentation of capacity of electric loco shed from 120 to 150 locos at a cost of Rs. 6.57
Crore.
Limited Height Subway Coach care Center at New coaching complex at a cost of Rs. 0.99
Crore.
One Mega Watt Power Roof top Solar Power Plants have been installed at Electric Loco
Shed Kanpur 449 Kwp.
At Kanpur Station:
New coaching complex in loco yard at a cost of Rs. 12.78 Crore.
Replacement of combined training center for carriage wagon and safetyat a cost of Rs.
4.70 Crore.
To improve power supply arrangement at and other installations, one new 3311 KV
electric substation has been installed at a cost of Rs. 3.40 Crore.
Extension in new cycle/scooter stand at city side at a cost of Rs. 0.40 Crore.
Electrification work at (10.02Km) at a cost of Rs. 28.6 Crore.
2. IMPROVEMENTS IN PASSENGER AMENITIES:
Govindpuri Development of Circulating Area at a cost of Rs.1.50 Crore.
Toilets for divyang provided at all platforms at a cost of Rs. 0.15 Crore.
Two LED type station name boards have been installed at Panki Railway station.
Electrification of Rooma Railway station has been done at a cost of Rs. 0.10 Crore.
At Kanpur Station
60 CCTV cameras Installed at a cost of Rs. 2.50 Crore.
51 wifi locations at a cost of Rs. 0.70 Crore.
Improvement of terminal facilities at Goods Shed made at a cost of Rs. 0.69 Crore.
One passengers Lift has been installed on PF 6/7 at a cost of Rs. 0.43 Crore.
Replacement of Platform shelter at a cost of Rs. 0.19 Crore.
Three LED type station name boards have been installed.
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
C. OTHER DEVELOPMENTS:
NEW TRAINS INTRODUCED WITH STOPPAGE OVER KANPUR CONSTITUENCY
Train No 14101/14102 - From Prayag to Kanpur Central .
Train No 14221/14222 - From Faizabad-Kanpur Anwarganj.
Train No 22443/22444 - From Kanpur Central to Bandra (T).
Train No 64589/64590 - From Kanpur Central- Phaphund.
Train No 12595/12596 - Humsafar Express From Gorakhpur- Anand Vihar (T).
Train No 12571/12572 -Humsafar Express From Gorakhpur-Anand Vihar (T).
Train No 15063/15064 - (T) From Gorakhpur to Lokmanya Tilak (T).
Train No 15065/15066 - From Gorakhpur to Panvel .
Train No 15068/15067 - From Bandra (T) to Gorakhpur.
Train No 19041/19042 - From Bandra (T)-Ghazipur city.
Train No 19305/19306 - From Indore to Guwahati.
Train No 22434/22433 - From Anand Vihar (T) to Ghazipur City.
Train No 22121/22122 - AC Express From Lokmanya Tilak - Lucknow via Kanpur Central.
Train No 22921/22922 - Antyodaya Express From Bandra T to Gorakhpur.
Train No 20502/20501 - Anand Vihar (T) - Agartala Rajdhani Express From Anand Vihar (T)-
Agartala via Kanpur Central.
Train No 22427/22428 - Bhrigu Express From Ballia to Anand Vihar (T) via Kanpur
Central.
Train No 11079/11080- From Lokmanya Tilak (T) to Gorakhpur.
Train No 11407/11408 - From Pune to Lucknow.
Train No 12597/12598 - Jan Sadharan Express From Gorakhpur to Mumbai CST.
Train No 19401/19402 - From Ahmedabad Jn to Lucknow.
Train No 19022/19021 - From Lucknow Jn to Bandra.
Train No 19715/19716 - Jaipur - Lucknow Express .
Train No 13167/13168 - Kolkata - Agra Cantt Express .
Train No 22411/22412 - Naharlagun - New Delhi AC Express .
Train No 15029/15030- Gorakhpur- Pune Express .
Train No 12581/12582-Manduadih-New Delhi Express .
Train No 14155/14156 - Kanpur - Jammu Tawi Express .
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
Train No 22857/22858-Santragachi-Anand Vihar T Express .
New Stoppages :
Train No 12179/12180- Intercity Express-From Lucknow to Agra Cantt at Panki.
Train No 12451/12452 - Shram Shakti Express - From Kanpur Central to New Delhi at
Panki.
Train No 14163/14164 - Sangam Express - From Allahabad Jn to Meerut City at Panki
Train No 14218 - Unchahar Express - From Chandigarh to Prayag at Jhinjhak.
Train No 12419/12420 - Gomti Express - From Lucknow to New Delhi - New Stoppage at
Panki.
Extension of Train:
Extension of 14155/14156 Jammu Tavi-Kanpur up to Allahabad.
D. ON GOING WORKS:
Construction of Road Over Bridge Limited Height Subway in lieu of:
Level Crossing No. 154 on Fatehgarh-Farrukhabad section at a cost of Rs. 3,501.96 Lakh.
Level Crossing No. 10 and 13 on Kanpur Anwar Ganj - Kasganj section each at a cost of
Rs.3,501.96 Lakh.
Level Crossing No. 4 and 9 on Kanpur Anwarganj-Rawatganj section each at a cost of Rs.
3657.04 Lakh.
Level Crossing No. 31 and 32 on Kanpur Anwarganj-Farrukhabad section each at a cost
of Rs. 249.83 Lakh.
Kanpur Anwar ganj-Rawatpur - Road over bridge in lieu of level crossing No. and 2, 3 and
7 at a cost of Rs. 10505.88 Lakh.
At Kanpur Central Station:
Kanpur Coaching maintenance facilities in loco shed area at Kanpur Phase III at a cost of
Rs. 8.25 Crore.
Kanpur Central - Coaching maintenance facilities in loco shed area Phase-II at a cost of
Rs. 8.25 Crore.
Kanpur-Upgradation of ROH maintenance facilities at GMC depot at a cost of Rs. 3.91
Crore.
Replacement refurbishment of cat walk and other repairs works to washing pit line Kanpur
at a cost of 3.11 Crore.
Kanpur-Premium end to end examination facilities on additional lines in Kanpur Goods
Marshalling yard at a cost of Rs. 2.44 Crore.
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCYWater treatment and recycling plants at coaching depot Kanpur at a cost of Rs. 1.29 Crore.
water treatment and re cycling plant in important coaching depots at new coaching complex at a
cost of Rs. 1.29 Crore.
Pre cooling points on platform No.1, 2, 3, 4, 5, 6, 7 at a cost of Rs. 0.95 Crore.
01 escalator at Kanpur Central at a cost of Rs. 0.40 Crore.
RCC benches in lieu of existing seating arrangement around column post of platform shelters, on
various platforms of Kanpur central at a cost of Rs.0.12 Crore .
Other Works:
Hydrant pipe lines for train watering at Govindpuri at a cost of Rs. 1.80 Crore.
Height gauge at 09 subway/LHS in Kanpur Anwarganj-Mathura Cantt section at a cost of
Rs.41.68 Lakh.
Kanpur - RPF barracks misc. other works at a cost of Rs. 1.44 Crore.
Auto announcement system at Burwhal Jn., Colonelganj, Daliganj Jn., Kanpur Anwarganj, Bally,
& Gola Gokarannath stations at a cost of Rs. 47.85 Crore.
Construction of Kanpur flyover between Bhimsen to Kanpur Central at a cost of Rs.1789.73 Crore.
Rooma-Chakeri-Chandari - 3rd line 12.5 km at a cost of Rs. 176.68 Crore.
Electronic Interlocking & Yard remodelling work of Panki at a cost of Rs. 107.68 Crore.
4th line connecting Down loop of Bhaupur to shunting neck of Panki, at a cost of Rs. 81.89
Crore.
Construction of MEMU Car shed at a cost of Rs. 49.62 Crore.
Replacement of mechanical signaling assets of Juhi A and B Cabin by Centralised operation of
points and signals at a cost of Rs. 35.62 Crore.
New Coaching Complex-Kanpur 2.5 km at a cost of Rs.34.28 Crore.
Additional loops at Govindpuri station with Electronic Interlocking/ Yard remodelling work at a cost
of Rs. 20.53 Crore.
Traction motor shed extension of shed for rewinding of 03 phase traction motors of electric
locomotives at a cost of Rs.14.07 Crore.
Additional washing pit line berthing 24-coach length with one stabling line at new coaching
complex at a cost of Rs. 12.44 Crore.
Augmentation of holding capacity from 150 to 175 locos at a cost of Rs. 10.93 Crore.
Extension of Clear standing room of 10,13,15 16 in GMC Down through Yard to make it 715
metres by dismantling Line No 11, 14 and shifting of points and crossings at a cost of Rs. 7.31 Crore.
INPUTS BY RAILWAY IN KANPUR PARLIAMENTARY CONSTITUENCY
KANPUR PARLIAMENTARY CONSTITUENCY
Down Loop at Maitha station with Sand Hump and Hot Axle Siding, extension of
Platform by 100 m and widening of Platform by 2m at a cost of Rs. 5.96 Crore.
Replacement of age old steel over head tank 05 with RCC over head tank with
replacement of associated pipe lines at a cost of Rs. 6.05 Crore.
Implementation of 100MWp roof top solar project for Indian Railways. For Allahabad
Division. 2.7MWp 600 KWp at a cost of Rs. 3.90 Crore.
Replacement of worn out pipe line for different colonies service buildings along with water
grid design at a cost of Rs. 3.00 Crore.
New works for splitting of two block sections, logistic park, chord line, satellite station, sand
humps, simultaneous movement and conversion to B-class station at Kanpur Anwarganj
at a cost of Rs. 2.76 Crore.
Premium end to end PEE examination facilities on additional lines in Kanpur Goods
Marshalling yard at a cost of Rs. 2.44 Crore.
Goods Marshalling Yard Premium end to end examination facilities Phase-II 2008-09.
Segregation of power supply at EI stations in Kanpur - Ghaziabad section at a cost of 2.02
Crore.
Covered shed for stabling of 140 ton B.D. Crane at a cost of Rs. 1.89 Crore.
Hydrant pipe line for train watering at Govindpuri at a cost of Rs.1.80 Crore.
30 Lifts at A1, A other pilgrim stations with high passenger density at a cost of Rs. 1.72
Crore.
Raising and resurfacing of Platform no. 10 at a cost of Rs. 1.23 Crore.
Shifting of parcel office to city side at a cost of Rs. 1.23 Crore.
Modification in layout of track of PF No. 2 3 to accommodate 24 coach length trains at a
cost of Rs. 0.99 Crore.
Kanpur-Conversion of existing Bio laterine into Flush laterine laying of sewer line in
different colonies to connect nagar nigam storm water drainage at Kanpur at a cost of
Rs.2.23 Crore.
Automatic Ticket Vending Machine at Kanpur. Mechanized Cleaning at Kanpur.
Redesigning of Shatabdi Exp. Escalator at Kanpur.
New theme park in Kanpur circulating area.
Digital reservation chart display board.
Inauguration of Bandra-Patna Exp. at Kanpur.
Stoppage of Sangam Exp. at Panki.
Inauguration of 22121 Lokmanya Tilak- Lukhnow AC Exp.