Post on 29-Apr-2023
SEKSYEN IIG - PRIME COST AND PROVISIONAL SUMS
ITEM DESCRIPTION UNIT QUANTITY RATE
MECHANICAL WORKS
Air-conditioning system
A
Conditioning System SUM
B ADD for Main Contractor's profit %
C Allow for attendance as described in the
executing the above work ITEM
Fire Fighting System
D(RM1,000,000.00) for Fire Fighting System SUM
E ADD for Main Contractor's profit %
F Allow for attendance as described in the
executing the above work ITEM
Lift System
G Allow a Sum of Ringgit Malaysia Three HundredThousand Only (RM300,000.00) for Lift System SUM
H ADD for Main Contractor's profit %
J Allow for attendance as described in the
executing the above work ITEM
The following Prime Cost Sums are provided works to be executed by Nominated Sub-Contractors
Allow a Sum of Ringgit Malaysia One Million Hundred Thousand Only (RM1,300,000.00) for
Preliminaries' upon the Nominated Sub-
Allow a Sum of Ringgit Malaysia One Million
Preliminaries' upon the Nominated Sub-
Preliminaries' upon the Nominated Sub-
TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE
ELECTRICAL WORKS
Internal Electrical Works
AHundred Sixty Thousand Only (RM 1,660,000.00)for Internal Electrical Works SUM
B ADD for Main Contractor's profit %
C Allow for attendance as described in the
executing the above work ITEM
External Electrical Works
D
for External Electrical Works SUM
E ADD for Main Contractor's profit %
F Allow for attendance as described in the
executing the above work ITEM
Extra Low Voltage
G Allow a Sum of Ringgit Malaysia Eight HundredThousand Only (RM 800, 000.00) for Extra LowVoltage SUM
H ADD for Main Contractor's profit %
J Allow for attendance as described in the
executing the above work ITEM
Telephone System and Information andCommunication Technology
K Allow a Sum of Ringgit Malaysia Eight Hundred
and Information and Communcation Technology SUM
L ADD for Main Contractor's profit %
Allow a Sum of Ringgit Malaysia One Million
Preliminaries' upon the Nominated Sub-
Allow a Sum of Ringgit Malaysia One Million ThreeHundred Twenty Thousand Only (RM
Preliminaries' upon the Nominated Sub-
Preliminaries' upon the Nominated Sub-
Thousand Only (RM 800,000) for Telephone
TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE
A Allow for attendance as described in the
executing the above work ITEMPreliminaries' upon the Nominated Sub-
AMOUNT
1,300,000.00
19,500.00
19,500.00
1,000,000.00
15,000.00
15,000.00
300,000.00
4,500.00
4,500.00
2,678,000.00 AMOUNT
1,660,000.00
24,900.00
24,900.00
1,320,000.00
19,800.00
19,800.00
800,000.00
12,000.00
12,000.00
800,000.00
12,000.00
SEKSYEN IIC5 - BILIK SERVICES
ITEM DESCRIPTION UNIT QUANTITY RATE
Relocation of trees
AHundred Thousand Only (RM500,000.00) forRelocation of trees SUM
Landscaping Works
BMillion Only (RM1,000,000.00) for LandscapingWorks SUM
Interior Design Works and Loose Furniture
CMillion Five Hundred Thousand Only
Loose Furniture SUM
M&E
D
M&E SUM
Pintu Gerbang
FThousand Only (RM80,000.00) for Pintu Gerbang SUM
Relocation of Services
AHundred Eighty Thousand Only (RM180,000.00)for Relocation of Existing Services SUM
The following Provisional Sums provided shall expended as directed by the Superintending or deducted in whole or in part if not
Allow a Provisional Sum of Ringgit Malaysia
Allow a Provisional Sum of Ringgit Malaysia One
Allow for a Provisional Sum of Ringgit Malaysia One(RM1.500,000.00) for Interior Design Works
Allow a Provisional Sum of Ringgit Malaysia Hundred Fifty Thousand Only (RM 350,000.00)
Allow a Provisional Sum of Ringgit Malaysia
Allow a Provisional Sum of Ringgit Malaysia
TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE
Water Fountain System
B
Fountain System SUM
Kontraktor Kelas E
CHundred Thousand Only (RM200,00.00) forSignages Works to be executed by Class F"Bumiputera" Contractor and to be expended as
in whole or in part if not expended SUM
D ADD for Main Contractor's profit %
E Allow for attendance as described in the
the above work ITEM
Kontraktor Kelas F
Hundred Thousand Only (RM200,00.00) forSignages Works to be executed by Class F"Bumiputera" Contractor and to be expended as
in whole or in part if not expended SUM
ADD for Main Contractor's profit %
Allow for attendance as described in the
the above work ITEM
Allow a Provisional Sum of Ringgit Malaysia Hundred Thousand Only (RM200,000.00) for
Allow a Provisional Sum of Ringgit Malaysia
directed by the Superintending Officer or deducted
Preliminaries' upon the Kelas F Contractor executing
Allow a Provisional Sum of Ringgit Malaysia
directed by the Superintending Officer or
Preliminaries' upon the Kelas F Contractor
SOT/1 MITG Group Sdn. Bhd.
SUMMARY OF TENDER
ITEM DESCRIPTION FROM PAGE
SUMMARY
PRIME COST SUMS AND PROVISIONAL SUMS
1 PRIME COST SUMS G/1/4
2 PROVISIONAL SUMS G/2/3
TOTAL FOR BANGUNAN UTAMA