G - PRIME COST AND PROVISIONAL SUMS

22
SEKSYEN II G - PRIME COST AND PROVISIONAL SUMS ITEM DESCRIPTION UNIT QUANTITY RATE MECHANICAL WORKS Air-conditioning system A Conditioning System SUM B ADD for Main Contractor's profit % C Allow for attendance as described in the executing the above work ITEM Fire Fighting System D (RM1,000,000.00) for Fire Fighting System SUM E ADD for Main Contractor's profit % F Allow for attendance as described in the executing the above work ITEM Lift System G Allow a Sum of Ringgit Malaysia Three Hundred Thousand Only (RM300,000.00) for Lift System SUM H ADD for Main Contractor's profit % J Allow for attendance as described in the executing the above work ITEM The following Prime Cost Sums are provided works to be executed by Nominated Sub- Allow a Sum of Ringgit Malaysia One Million Hundred Thousand Only (RM1,300,000.00) for Preliminaries' upon the Nominated Sub- Allow a Sum of Ringgit Malaysia One Million Preliminaries' upon the Nominated Sub- Preliminaries' upon the Nominated Sub-

Transcript of G - PRIME COST AND PROVISIONAL SUMS

SEKSYEN IIG - PRIME COST AND PROVISIONAL SUMS

ITEM DESCRIPTION UNIT QUANTITY RATE

MECHANICAL WORKS

Air-conditioning system

A

Conditioning System SUM

B ADD for Main Contractor's profit %

C Allow for attendance as described in the

executing the above work ITEM

Fire Fighting System

D(RM1,000,000.00) for Fire Fighting System SUM

E ADD for Main Contractor's profit %

F Allow for attendance as described in the

executing the above work ITEM

Lift System

G Allow a Sum of Ringgit Malaysia Three HundredThousand Only (RM300,000.00) for Lift System SUM

H ADD for Main Contractor's profit %

J Allow for attendance as described in the

executing the above work ITEM

The following Prime Cost Sums are provided works to be executed by Nominated Sub-Contractors

Allow a Sum of Ringgit Malaysia One Million Hundred Thousand Only (RM1,300,000.00) for

Preliminaries' upon the Nominated Sub-

Allow a Sum of Ringgit Malaysia One Million

Preliminaries' upon the Nominated Sub-

Preliminaries' upon the Nominated Sub-

TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE

ELECTRICAL WORKS

Internal Electrical Works

AHundred Sixty Thousand Only (RM 1,660,000.00)for Internal Electrical Works SUM

B ADD for Main Contractor's profit %

C Allow for attendance as described in the

executing the above work ITEM

External Electrical Works

D

for External Electrical Works SUM

E ADD for Main Contractor's profit %

F Allow for attendance as described in the

executing the above work ITEM

Extra Low Voltage

G Allow a Sum of Ringgit Malaysia Eight HundredThousand Only (RM 800, 000.00) for Extra LowVoltage SUM

H ADD for Main Contractor's profit %

J Allow for attendance as described in the

executing the above work ITEM

Telephone System and Information andCommunication Technology

K Allow a Sum of Ringgit Malaysia Eight Hundred

and Information and Communcation Technology SUM

L ADD for Main Contractor's profit %

Allow a Sum of Ringgit Malaysia One Million

Preliminaries' upon the Nominated Sub-

Allow a Sum of Ringgit Malaysia One Million ThreeHundred Twenty Thousand Only (RM

Preliminaries' upon the Nominated Sub-

Preliminaries' upon the Nominated Sub-

Thousand Only (RM 800,000) for Telephone

TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE

A Allow for attendance as described in the

executing the above work ITEMPreliminaries' upon the Nominated Sub-

TO COLLECTION

COLLECTION

Page No. G/1/1

Page No. G/1/2

Page No. G/1/3

PRIME COST SUMS

CARRIED TO SUMMARY

AMOUNT

1,300,000.00

19,500.00

19,500.00

1,000,000.00

15,000.00

15,000.00

300,000.00

4,500.00

4,500.00

2,678,000.00 AMOUNT

1,660,000.00

24,900.00

24,900.00

1,320,000.00

19,800.00

19,800.00

800,000.00

12,000.00

12,000.00

800,000.00

12,000.00

4,705,400.00 AMOUNT

12,000.00

12,000.00

2,678,000.00

4,705,400.00

12,000.00

7,395,400.00

SEKSYEN IIC5 - BILIK SERVICES

ITEM DESCRIPTION UNIT QUANTITY RATE

Relocation of trees

AHundred Thousand Only (RM500,000.00) forRelocation of trees SUM

Landscaping Works

BMillion Only (RM1,000,000.00) for LandscapingWorks SUM

Interior Design Works and Loose Furniture

CMillion Five Hundred Thousand Only

Loose Furniture SUM

M&E

D

M&E SUM

Pintu Gerbang

FThousand Only (RM80,000.00) for Pintu Gerbang SUM

Relocation of Services

AHundred Eighty Thousand Only (RM180,000.00)for Relocation of Existing Services SUM

The following Provisional Sums provided shall expended as directed by the Superintending or deducted in whole or in part if not

Allow a Provisional Sum of Ringgit Malaysia

Allow a Provisional Sum of Ringgit Malaysia One

Allow for a Provisional Sum of Ringgit Malaysia One(RM1.500,000.00) for Interior Design Works

Allow a Provisional Sum of Ringgit Malaysia Hundred Fifty Thousand Only (RM 350,000.00)

Allow a Provisional Sum of Ringgit Malaysia

Allow a Provisional Sum of Ringgit Malaysia

TO COLLECTIONITEM DESCRIPTION UNIT QUANTITY RATE

Water Fountain System

B

Fountain System SUM

Kontraktor Kelas E

CHundred Thousand Only (RM200,00.00) forSignages Works to be executed by Class F"Bumiputera" Contractor and to be expended as

in whole or in part if not expended SUM

D ADD for Main Contractor's profit %

E Allow for attendance as described in the

the above work ITEM

Kontraktor Kelas F

Hundred Thousand Only (RM200,00.00) forSignages Works to be executed by Class F"Bumiputera" Contractor and to be expended as

in whole or in part if not expended SUM

ADD for Main Contractor's profit %

Allow for attendance as described in the

the above work ITEM

Allow a Provisional Sum of Ringgit Malaysia Hundred Thousand Only (RM200,000.00) for

Allow a Provisional Sum of Ringgit Malaysia

directed by the Superintending Officer or deducted

Preliminaries' upon the Kelas F Contractor executing

Allow a Provisional Sum of Ringgit Malaysia

directed by the Superintending Officer or

Preliminaries' upon the Kelas F Contractor

TO COLLECTION

COLLECTION

Page No. G/2/1

Page No. G/2/2

PROVISIONAL SUMS

CARRIED TO SUMMARY

AMOUNT

500,000.00

1,000,000.00

1,500,000.00

300,000.00

80,000.00

180,000.00

3,560,000.00 AMOUNT

200,000.00

350,000.00

5,250.00

5,250.00

200,000.00

3,000.00

3,000.00

766,500.00

3,560,000.00

766,500.00

4,326,500.00

SOT/1 MITG Group Sdn. Bhd.

SUMMARY OF TENDER

ITEM DESCRIPTION FROM PAGE

SUMMARY

PRIME COST SUMS AND PROVISIONAL SUMS

1 PRIME COST SUMS G/1/4

2 PROVISIONAL SUMS G/2/3

TOTAL FOR BANGUNAN UTAMA

SOT/1 MITG Group Sdn. Bhd.

SOT/1 MITG Group Sdn. Bhd.

SUMMARY OF TENDER

Amount (RM)

7,395,400.00

4,326,500.00

11,721,900.00

SOT/1 MITG Group Sdn. Bhd.