Post on 08-May-2023
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Use of CDBG Funds (Senior Center/Public Works Projects)
BACKGROUND: We are in the planning and design phase for the senior center and we believe we can obtain five hundred thousand ($500,000.00) dollars from a county CDBG grant. Previously, the City Council had directed staff to refrain from applying for CDBG grants. Staff wants to inquire if the Council might change its position given the political change in the U.S. administration.
PREPARED BY: Kent Cagle, City Manager
4
Local Government Program Participants withCDBG Grants In FYlS of $500,000 or Less'
Local Government Program Participants with CDBG Grants in FYlS that are Over $500,000
States and Insular Areas
Local Governments, States, and Insular Areas Option 1:
Submit an AFH Alone
Am,licable Assessment Tool: Local Government Assessment Tool
Submission Deadline: 270 days prior to the program year start date for the next 3-5-year consolidated planning cycle beginning on or after January 1, 2019.
AQQlicable Assessment Tool: Local Government Assessment Tool
Submission Deadline: 270 days prior to the program year start date for the next 3-5-year consolidated planning cycle.
AQQlicable Assessment Tool: Assessment Tool for States and Insular Areas
Submission Deadline: Triggered by approval and publication of a final Assessment Tool for State and Insular Areas
Option 2: Collaboration with one or more Local Governments or PHAs on
an AFH
AQQlicable Assessment Tool: Local Government Assessment Tool with option to use $500,000 or Less Local Government Insert if the Program Participant is eligible
Submission Deadline: Based on Lead Submitter's Submission Deadline
AQQlicable Assessment Tool: Local Government Assessment Tool
Submission Deadline: Based on Lead Submitter's Submission Deadline
AQQlicable Assessment Tool: Assessment Tool for States and Insular Areas
Submission Deadline: Triggered by approval and publication of a final Assessment Tool for State and Insular Areas
Option 3: Collaboration with State Lead
Entity on an AFH
AQQlicable Assessment Tool: Assessment Tool for States and Insular Areas with option to use $500,000 or Less Local Government Insert if the Program Participant is eligible
Submission Deadline: Based on Lead Submitter's Submission Deadline, which is triggered by approval and publication of a final State Assessment Tool
AQQlicable Assessment Tool: Assessment Tool for States and Insular Areas
Submission Deadline: Based on Lead Submitter's Submission Deadline, which is triggered by approval and publication of a final State Assessment Tool
3 For any HOME consortium whose members do not receive CDBG funds or whose members collectively received
$500,000 or less in CDBG funds in FY2015, the consortium's first AFH is due 270 days prior to the program year for
which a new 3-5-year Consolidated Plan is due starting on or after January 1, 2019. For any HOME consortium in
which members received more than $500,000 in CDBG funds in FY2015, the consortium's first AFH is due 270 days
prior to the program year for which a new 3-5 Consolidated Plan is due starting on or after January 1, 2017. 81
Fed. Reg. 73129.
6
Option 1:
Submit an AFH Alone
Applicable Assessment Tool: QPHA Assessment Tool
QPHAs (Fewer than 550 Units) Submission Deadline:
270 days prior to the program year start date for the next 5-year cycle.
Triggered by the announcement of the availability of all resources for completion of the Final QPHA Assessment Tool
PHAs 1250 Applicable orfewer Assessment Tool: Units PHA Assessment Tool
Public Housing Agencies Option 2:
PHA-Only Collaboration on an AFH
Applicable Assessment Tool: PHA Assessment Tool with option to use PHA Insert
Submission Deadline: 270 days prior to the program year start date for the next 5-year cycle of the Lead PHA.
Triggered by the announcement of the availability of all resources for completion of the Final PHA Assessment Tool
Applicable Assessment Tool: PHA Assessment Tool with option to use 1,250 unit or fewer PHA Insert ("PHA Insert")
Option 3: Collaboration with one
or more Local Governments on an
AFH
Applicable Assessment Tool: Local Government Assessment Tool with option to use PHA Insert
Submission Deadline: Based on Lead Submitter's Submission
Deadline
Applicable Assessment Tool: Local Government Assessment Tool with option to use the PHA Insert
Option 4: Collaboration with
State as Lead Entity on an AFH
Applicable Assessment Tool: Assessment Tool for States and Insular Areas with option to use PHA Insert
Submission Deadline: Triggered by approval and publication of a final Assessment Tool for States and Insular Areas
Applicable Assessment Tool: Assessment Tool for States and Insular Areas with option to use PHA Insert'
4 While not final, HUD announced its intention to make an insert available to PHAs with 1250 units or fewer in the case of collaboration using the State Assessment Tool, as it has in the local Government and PHA Assessment Tools. See 82 Fed. Reg. 4388 (Jan. 13, 2017).
7
Public Housing Agencies Option 1: Option 2: Option 3: Option 4:
Submit an AFH Alone PHA-Only Collaboration Collaboration with one Collaboration with on an AFH or more Local State as Lead Entity
Governments on an on an AFH
AFH
Submission Deadline: Submission Deadline: Submission Deadline: Submission Deadline: 270 days prior to the 270 days prior to the Based on Lead Triggered by
program year start program year start date Submitter's Submission approval and
date for the next 5- for the next 5-year PHA Deadline publication of a final
year PHA Planning planning cycle of the Assessment Tool for
cycle. Lead PHA. States and Insular
Areas
Triggered by the Triggered by the
announcement of the announcement of the
availability of all availability of all
resources for resources for
completion of the completion of the Final
Final PHA Assessment PHA Assessment Tool
Tool
Applicable Applicable Assessment Applicable Assessment Applicable
Assessment Tool: Tool: Tool: Assessment Tool:
PHA Assessment Tool PHA Assessment Tool Local Government Assessment Tool for
Assessment Tool States and Insular
PHAs with Areas
more than
1250 units Submission Deadline: Submission Deadline: Submission Deadline: Submission Deadline:
270 days prior to the 270 days prior to the Based on Lead Triggered by
program year start program year start date Submitter's Submission approval and
date for the next 5- for the next 5-year PHA Deadline publication of a final
year PHA Planning Planning cycle. Assessment Tool for
cycle. States and Insular
Triggered by the Areas
Triggered by the announcement of the
announcement of the availability of all
availability of all resources for
resources for completion of the Final
completion of the PHA Assessment Tool
Final PHA Assessment
Tool
8
PENDING THE AVAILABILITY OF APPLICABLE ASSESSMENT TOOLS
• Are Program Participants subject to the obligation to affirmatively further fair housing?
Yes. Under the Fair Housing Act and other statutory authorities, HUD program participants
receiving Federal financial assistance are required to administer their programs and activities in
a manner that affirmatively furthers fair housing.
• Are Program Participants that Lack an Applicable Assessment Tool subject to the requirementsto conduct an AFH?
Not yet. The Affirmatively Furthering Fair Housing (AFFH) Final Rule provides that no AFH will be
due before the publication of the Assessment Tool applicable to the program participant (or
lead entity in a collaboration). Further, HUD must provide a minimum of 9 months after the
publication of the final Assessment Tool when setting a new deadline for submission of the AFH.
See 24 C.F.R. § 5.160(a)(l)(ii). Program participants should consult the tables above, which
directs which Assessment Tool they should use as well as their current availability as of the date
of this guidance.
• What should a Program Participant do to continue to comply with AFFH requirements pending
the availability of its applicable Assessment Tool?
Under the Fair Housing Act and other statutory authorities, program participants have a
continuing obligation to affirmatively further fair housing. The AFFH Rule provides that "until
such time as [a] program participant [is] required to submit an AFH, the program participant
shall continue to conduct an analysis of impediments ... in accordance with requirements in
effect prior to August 17, 2015." 24 C.F.R. § 5.160(a)(3).
For a State or Insular area, or a program participant collaborating with a State or Insular Area as
the lead entity, this means it will continue to certify in accordance with the existing AFFH
certification requiring that the participant will affirmatively further fair housing. The certification
for a local government, State, or Insular Area indicates that it will conduct an Analysis of
Impediments to Fair Housing Choice (Al) to identify impediments to fair housing choice within
the jurisdiction or State, take appropriate actions to overcome the effects of any impediments
identified through that analysis, and maintain records reflecting the analysis and actions. As ·a
result, these program participants will continue to conduct Als, as opposed to AFHs, until such
time as a final Assessment Tool for their use has been approved in accordance with the PRA.
Similarly, PHAs will continue to certify that they will continue to affirmatively further fair
housing. Program Participants remain subject to FHEO compliance reviews and investigations,
and HUD may request and review the Al or other records in the event of a complaint or during
routine onsite or offsite monitoring.
9
ADDITIONAL GUIDANCE RELATED SPECIFICALLY TO STATES OR INSULAR AREAS
OR COLLABORATIONS LED BY STATES OR INSULAR AREAS
• Status of State Assessment Tool PRA Process
In a Federal Register Notice dated September 28, 2016 (81 Fed. Reg. 66754), HUD solicited
comment on a draft version of an Assessment Tool for States and Insular Areas and also
announced a two-stage process for soliciting public comment and feedback before the Office of
Management and Budget (0MB) would approve the final Assessment Tool under the PRA. This
Notice stated:
Following this first stage of the extended PRA process, HUD will provide an updated version ofthe Assessment Tool. States and Insular Areas will not be required to use the Assessment Tool
to complete an AFH until such time HUD publishes a final Notice announcing the availability of
the final Assessment Tool and final AFFH-T for States and Insular Areas. This final Notice will not
be published until after the second stage of this extended PRA process has been completed. By
providing the updated version of the Assessment Tool prior to issuance of the final Notice, HUD is
providing on opportunity for the public and program participants to have advanced review of the
proposed requirements.
As of the date of this guidance, HUD is continuing to develop an updated version of the
Assessment Tool, which HUD intends to publish before proceeding to a second 30-Day PRA
Notice and Comment period. This second stage in this extended process will allow the public a
further opportunity to review and provide feedback on the interaction between the Assessment
Tool and the AFFH-T, to inform any necessary changes to the Assessment Tool itself.
• Should a State or Insular Area update its Analysis of Impediments to Fair Housing Choice (Al)
or wait for the Assessment Tool for States and Insular Areas?
HU D's longstanding guidance on the Al process, the Fair Housing Planning Guide, "suggests that
jurisdictions conduct or update their Al at least once every 3 to 5 years (consistent with the
Consolidated Planning Cycle)." Until the final publication of an Assessment Tool for States and
Insular Areas, HUD recommends completing an update of the Al according to the existing
guidance pending the final Assessment Tool for States and Insular Areas. HUD will continue to
provide program participants and the public information regarding the status of the Assessment
Tool for use by States and Insular Areas.
• How can States and Insular Areas use the AFFH Rule framework, draft Assessment Tools, and
AFFH Data and Mapping Tool (AFFH-T) to Inform an Al update?
While HU D's Fair Housing Planning Guide remains HU D's official guidance for completing an Al,
HUD encourages any State or Insular Area that will update an Al pending a final Assessment Tool
to take advantage of the framework set forth in the AFFH Rule (specifically at 24 C.F.R. §
5.154(d)) and draft Assessment Tools as a way of completing the obligations of the Al. HUD
considers the objectives of the AFH-identifying significant contributing factors and related fair
housing issues and establishing goals for overcoming the effects of those-to enhance those of
the Al-identifying impediments to fair housing choice. The framework set forth in the AFFH
10
Rule provides a set of specific fair housing issues (segregation/integration, racially or ethnically concentrated areas of poverty (R/ECAPs), disparities in access to opportunity, and disproportionate housing needs) that States and Insular Areas may wish to analyze when conducting their Als.
In conducting or updating the Al, States or Insular Areas may in particular find the following resources to be useful:
• The Draft Assessment Tool for States and Insular Areas, as well as finalAssessment Tools for Local Governments and PHAs
• AFFH Data and Mapping Tool (AFFH-T)• The AFFH Rule Guidebook
The Assessment Tools are meant to assist program participants as they undertake planning processes to meet their AFFH planning obligations. As explained further in the Fair Housing Planning Guide, the scope of an Al is broad and considers a variety of private and public practices, policies, and procedures that affect housing choice. For example, as the Fair Housing Planning Guide explains in Section 2.5, "the Al structure should provide for effective, ongoing relationships with all elements of the community with clear and continuous exchange of concerns, ideas, analysis, and evaluation of results." As such, the community participation requirements of the AFFH Rule may provide States and Insular Areas with a useful framework for complying with their preexisting obligation. Similarly, when defining objectives and implementing Fair Housing Actions in conducting an Al, it may be useful for a State or Insular Area to consider the goal setting framework provided under the AFFH Rule and in the draft Assessment Tool.
In addition, HUD has provided maps and tables through the AFFH-T that can help show patterns related to fair housing issues. HUD is continuing to develop a beta version of the Data and Mapping Tool for States and Insular Areas, and will announce its availability through a Federal
Register Notice, at which point States, Insular Areas, and the public may provide HUD with comments regarding the functionality and data packages.
Finally, the AFFH Rule Guidebook provides more detailed guidance on how program participants can use the Assessment Tool and AFFH-T. HUD strongly encourages States to use these resources to inform their fair housing planning pending a final Assessment Tool for States and Insular Areas.
• How can States Collaborate with Local Governments or PHAs?
As it has developed the AFH process, HUD has encouraged local governments and PHAs to collaborate with States and Insular Areas in a joint or regional AFH.s HUD has also provided for one such method of collaboration with States and Insular Areas in its draft Assessment of Fair Housing Tool for States and Insular Areas by providing "inserts" for smaller program
5 See the AFFH Final Rule at 24 C.F.R. § 5,156(a) ("For the purposes of sharing resources and addressing fair housing issues from a broader perspective, program participants are encouraged to collaborate to conduct and
submit a single AFH, either a joint AFH or regional AFH ... for the purpose of evaluating fair housing issues and contributing factors.").
11
participants. By Notice dated January 13, 2017 {82 Fed. Reg. 4373, 4377), HUD has also
indicated it intends to make inserts for PHAs applicable to any PHAs with 1250 or fewer units.
In general, HUD anticipates that the opportunity to collaborate with a State or Insular Area on
fair housing planning may be particularly useful for smaller or more rural program participants
outside of larger metropolitan areas, or without opportunities for local collaboration within
their CBSA, or for other local governments or PHAs seeking to participate in a wider regional
approach to fair housing planning. PHAs that operate statewide or regionally or that operate
under a consortium (24 CFR C.F.R. Part 943) may also particularly benefit from an AFH
collaboration with a State.
Collaborating program participants must designate, through express written consent, one
participant as the lead entity to oversee the submission of the joint or regional AFH on behalf of all collaborating program participants. 24 C.F.R. § 5.156{a)(3). Program participants, whether
contiguous or non-contiguous, that are either not located within the same Core-Based Statistical Area {CBSA), or that are not located within the same State and seek to collaborate on an AFFH,
must submit a written request to HUD for approval of the collaboration, stating why the
collaboration is appropriate. 24 C.F.R. § 5.156{a)(2). In addition, program participants that
intend to prepare either a joint or regional AFH shall promptly notify HUD of such intention and
provide HUD with a copy of their written agreement. 24 C.F.R. § 5.516(a)(4).
In these written notifications or requests for approval, HUD recommends that program
participants describe (1) how the State- or Insular Area-led collaboration will improve their AFH
and related fair housing outcomes, (2) how the collaborating entities will ensure ongoing
compliance with AFFH requirements pending the availability of an Assessment Tool for States or
Insular Areas, and (3) include the written agreement between program participants.
For States or Insular Areas whose Consolidated Plans are due in FY 2017 or 2018, the State or
Insular Area can act as the lead entity for a joint collaboration, while completing its own Al. Any
program participant that is collaborating with a State or Insular Area as the lead entity should
also ensure it is complying with existing requirements to conduct or update their Al or otherwise meet the obligations of their AFFH certification, as applicable. HUD encourages States or Insular
Areas that are updating their Als to collaborate with their local government and PHA partners in
anticipation of the State- or Insular Area-led collaboration on the AFH. The collaboration may
develop a collaborative Al that helps to meet the AFFH requirements of the collaborating
partners.
For States or Insular Areas whose Consolidated Plans are due in FY 2019 or thereafter, such
States or Insular Areas may be designated as the lead entity for a joint or regional Assessment of
Fair Housing. The final Assessment Tool for States and Insular Areas to be issued by HUD
following the completion of the final PRA process is intended to include additional mechanisms
for implementing and achieving this result.
HUD will provide further instruction upon finalizing the Assessment Tool for States or Insular
Areas or HUD may reassess the status of such collaborations based on the availability of the
Assessment Tool.
• When is the Submission Date for the Collaboration?
12
To the extent practicable, all program participants must be on the same program year and fiscal year before submission of the joint or regional AFH. Program participants should also align consolidated planning cycles or PHA planning cycles to the extent practicable. The applicable procedures for changing consolidated plan program participant program year start dates, if necessary, are described in 24 C.F.R. § 91.10-20. The applicable procedures for changing PHA fiscal year beginning dates, if necessary, are described in 24 C.F.R. § 903.15. If alignment of a program year or fiscal year is not practicable, the submission deadline for a joint AFH or regional AFH will be based on the designated lead entity's program year start date. In the case where a State or Insular Area is the lead entity, the submission date will be subject to the extension based on when the final Assessment Tool for States and Insular Areas becomes available.•
• How do local governments or PHAs collaborating with a State or Insular Area lead entitycomply with AFFH obligations pending the final Assessment Tool for States and Insular Areas?
Under the AFFH Rule, program participants must submit an AFH in accordance with the submission deadlines in 24 C.F.R. § 5.160(a). Under 24 C.F.R. § 5.160(a)(1)(ii), a submission deadline will be extended as specified in the appropriate Assessment Tool applicable to the program participant or lead entity publication to a date that will be no less than 9 months from the date of publication. In the case where a local government or PHA joins a collaboration with the State as a lead entity, the local government or PHA must continue to comply with their respective AFFH certifications applicable prior to the new AFFH rule. For a local government, this means that it must certify that it "will conduct an [Al] within the jurisdiction, take appropriate actions to overcome the effects of any impediments identified through that analysis, and maintain records reflecting the analysis and actions in this regard." Similarly, a PHA is required to examine "programs or proposed programs, identify any impediments to fair housing choice within those programs, address those impediments in a reasonable fashion in view of the resources available and work with local jurisdictions to implement any of the jurisdiction's initiatives to affirmatively further fair housing that require the PHA's involvement and maintain records reflecting these analyses and actions." For those program participants that choose to join a State- or Insular Area-led collaboration, HUD encourages use of the additional tools available under the new AFH framework, as described above, to develop a collaborative Al to help participants in the collaboration meet their AFFH obligations pending the requirement to submit the AFH.
6See AFFH Final Rule at 24 C.F.R. § 5.160(c) ("Collaborative AFHs. All collaborative program participants, whether joint participants or regionally collaborating participants, will select a lead entity and submit the AFH according to
that entity's schedule."). See also, 24 C.F.R. § 5.160(a)(l)(ii), ("If the time frame specified in paragraph (a)(l) of
this [submissions requirements] section would result in a first AFH submission date that is less than 9 months
after the date of publication of the Assessment Tool that is applicable to the program participant or lead entity,
the participant(s)' submission deadline will be extended as specified in that Assessment Tool publication to a date
that will not be less than 9 months from the date of publication of the Assessment Tool.").
13
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Holding executive sessions in a workshop prior to regular council meeting and taking any necessary action during the regular meeting
BACKGROUND: Staff has noticed a trend starting to appear in other cities in which executive sessions are being conducted prior to the regular meetings, either as a work session or workshop. Any action deemed necessary as a result of the executive session, will take place during the regular meeting. Typically, this will take place at the end of the agenda (as it appears now).
Two positive reasons to consider this change would be the cost savings in legal expenses and consideration wait-time for the public. If the City Attorney is needed only for executive session, and no other matters, then time billed would be for the executive session – not the entire meeting.
In regard to the public, when conducting the executive session prior to the regular meeting, this will save the public from having to sit and wait while discussions are being held. This can sometimes be for an extended period of time, only to then find out no action is being taken as a result of the executive session.
One possible negative could be the earlier start time which may be difficult for some to make. The City Council has conducted eighteen (18) meetings, including special meetings since January, and seven (7) of the eighteen (18) meetings, contained executive sessions.
Staff has spoken with the City Attorney and we have been informed, there are no legal issues that would prevent the City Council from changing this, if Council should so desire.
PREPARED BY: Dara Crabtree, City Secretary
14
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Bond Project Update
• ITEM 4A Park Projects
• ITEM 4B Fire Station #4
• ITEM 4C Transportation Projects
15
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Bond Projects Update Parks and Recreation Department
BACKGROUND: The Parks and Recreation Department has several bond projects underway at this time. The current projects include Lakewood Community Park, Park Land Acquisition, Bledsoe Park Synthetic Turf Fields, Veterans Park Phase II, East Crystal Falls Parkway Median Landscaping, Mason Creek Trail and the Senior Activity Center. All of these projects were funded in Fiscal Year 2016/17.
Future Projects are Brushy Creek Trail (Hero Way), Recreation Center, Benbrook Ranch Baseball Fields, S. San Gabriel River Trail, S. San Gabriel River Park and Brushy Creek Trail (183A to Reagan).
The attached Power Point Presentation outlines each project.
ATTACHMENT: 1. Power Point Presentation
PREPARED BY: Mark Tummons, Parks & Recreation Director
16
Why? The benefits of parks, greenspace, trails and recreation amenities extend far beyond the users. They touch the lives of every person who lives, works and recreates in Leander. Improving our physical and psychological health, strengthening our community by bringing us together, bonding with family and friends, making our city an even more attractive place to live and work, protecting the environment through stewardship, providing alternative transportation opportunities and improving our local economy are just a few benefits that Leander residents have come to realize.
This overview captures those benefits already in the works!
18
Current Projects Project Number
Project Description Estimated Total Cost
FY 16-17 Future Funding Years
P1 Lakewood Community Park
$6,875,000 $565,000 $6,310,000 FY 18-19
P2 Park Land Acquisition 2,500,000 $2,500,000 $0
P3 Bledsoe Park Synthetic Turf Fields
$1,901,000 $1,901,000 $0
P4 Veterans Park $1,465,000 $600,000 $865,000 FY 18-19
P5 E. Crystal Falls PkwyMedian Landscaping
$610,000 $610,000 $0
P6 Mason Creek Trail $569,000 $569,000 $0
P7 Senior Activity Center $4,185,000 $500,000 $3,685,000 FY 18-19
19
Future Projects Project Number
Project Description Estimated Total Cost
FY 16-17 Future Funding Years
P8 Brushy Creek Trail (Hero Way)
$432,000 $0 $432,000 FY 18-19
P9 Recreation Center $18,000,000 $0 $1,800,000 FY 18-19 $16,200,000 FY 20-21
P10 Benbrook Ranch Baseball Fields
$400,000 $0 $400,000 FY 20-21
P11 S. San Gabriel River Trail $1,524,000 $0 $1,524,000 Future
P12 S. San Gabriel River Park $10,000,000 $0 $10,000,000 Future
P13 Brushy Creek Trail (183A to Ronald Reagan)
$3,199,000 $0 $3,199,000 Future
20
P1 Lakewood Community Park • $565,000 budgeted for initial phase to be matched
with TPWD Grant of $400,000• An additional $6,310,000 budget in FY18-19• Century Communities Developer moving forward
with development access possible in Spring 2018.• Would ensure an additional 45 acres of parkland as
originally planned• Final design/engineer drawings ready in late 2017,
with construction to coincide with sub-division entrance construction (Spring 2018)
21
P2 Parkland Acquisition – San Gabriel Property (Champion Park)
• COMPLETED Purchase of 34 acres in lateOctober 2016 for $2,250,000 + closing costs
• Provides a total of 78 acres for parkdevelopment
• Primary purpose is for youth sports andnature/hiking trails
• Incredible parcel of property for a variety offamily activities as well as economic impactbenefit with tournaments and leagues
23
P3 Robin Bledsoe Park Synthetic Turf Fields • Installation of Synthetic turf soccer fields to replace
heavily used grass fields• Approximately 210,000 sq. ft. or basically 4.5+ acres• SRA is the Design/Engineering Firm• Budget of $1,901,000, of which $1,750,00+/- is for
construction• Construction RFP being advertised now, with bids
due August 3rd
• Goal for completion around November 1, 201724
P4 Veterans Park – Phase II • $600,000 budget• Concrete Walking Trail around Perimeter of pond• Connecting Trail to Library• Quarry Block Benches; Pond Fountain; Trash cans
Landscaping (Shade and Ornamental trees, bedplantings)
• Wall/Walk of Honor; Donor Wall• Fazzone Construction to begin asap with a
completion date of November 10, 201726
P5 East Crystal Falls Parkway Median Landscaping • From 183 to Ronald Reagan• $610,000• Construction Plans being
finalized – potential tocreate two additionalmedians closer to 183
• Should go to bid in August2017 with construction tobegin in September andcompletion by end of 2017.
• Utilizing native, low waterconsumption type plants/trees to be planted duringthe Fall of 2017
29
P6 Mason Creek Greenway Trail
• Budget of $569,000• Design Contract with MWM
Design firm• Anticipate construction to begin
in winter (easier to clearunderbrush) finish in Spring2018
• Possible to obtain small lot oncorner of West and SonnyDrives to develop a Trail headwith approx. 10-12 parkingspaces (including ADA) andsignage
30
P7 Senior Activity Center and Head Start Facility • Budget of $500,000 for
design phase• Selected PGAL Design
Consulting firm tocomplete architecture
• Work closely with variousgroups as to possible needand space requirements
• Analysis and Design to becompleted in early 2018
32
P8 & P13 Brushy Creek Trails (Hero Way Spur to 183A & 183A to Ronald Reagan)
- Budget of $3,199,000- Connection to Sarita Valley Greenbelt andConservation Area
- Project scheduled for FY18-19
33
P9 Recreation Center • Budget of 1,800,000 in FY18-19 for design and
engineering with $16,200,000 in FY 20-21 forconstruction
• Have met with Jeff Andresen with YMCA and arecontinuing to work toward a final agreement
• Will develop RFQ to release in order to developdesign and construction documents in FY18-19
• Need is high
34
P 10 Benbrook Ranch Park Additional Baseball Field • $400,000 planned for funding in FY 20-21, but are moving this
project up to have ready by Fall League of 2018• In 2017 demand is high and will only continue to grow each
year• Possibly develop two T-Ball Fields
to alleviate growthpressure in 2018
35
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Bond Project Update - Fire Station Fire Station # 4
BACKGROUND: Fire Station # 4 is expected to be open for crews to move-in the last week of August, with a Grand Opening scheduled to occur September 9th from 10 am – 12 pm. The project’s budget was for $ 4.1 million and is on budget at this time.
The construction also included the ability to increase water and wastewater lines to support the area around the fire station site increasing the ability for development. All water and wastewater lines have been completed and placed in service.
PREPARED BY: Bill Gardner, Fire Chief
36
EXECUTIVE SUMMARY
07/22/2017
RETREAT AGENDA SUBJECT: Update on Bond Projects - Transportation
BACKGROUND: Staff will provide an update on bond funded projects from the 2015 and 2016 Certificates of Obligation and the 2016 General Obligation Bonds.
• Hero Way West• Bagdad Road• Metro Drive• Raider Way and E. Woodview Drive• San Gabriel Parkway• East Street• Brushy Street Streetscape
ATTACHMENT: 1. PowerPoint
PREPARED BY: Wayne S. Watts, P.E., CFM, City Engineer
37
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
Hero Way West Bagdad Road Metro Drive Raider Way/East Woodview E. San Gabriel Parkway East Street Brushy Street Streetscape
38
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
Hero Way West
Construction commenced in January of2016, and although there have beensignificant rain delays, the project is onschedule with substantial completionexpected in October of this year.
The current construction contract amount is$22,817,295.85, and the project isapproximately 85% complete.
40
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
Bagdad Road
Work consists of the reconstruction and widening Bagdadto five undivided lanes with curb, gutter, storm sewers,utilities relocations, water quality facilities, and sidewalksfrom Hero Way West to Collaborative Way.
Angel Brothers Enterprises Ltd., was awarded theconstruction contract on January 5, 2017 in the amountof $8,091,140.30.
Construction began March with substantial completionexpected within 18 months.
This project is approximately 15% complete.
42
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
Metro Drive
Halff Associates has completed preliminary design.
Task Order for final design services was approved at 02/2/17Council Meeting in the amount of $567,140.
60% plans have been reviewed and comments issued.
90% plans are expected in late July for review and comment.
Project is expected to bid in October pending acquisition ofeasements and rights-of-way identified in 90% plans.
Construction must be complete for opening of ACC in lateAugust of 2018.
45
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
Raider Way/East Woodview
Walker Partners Engineering, Inc. is under contract for design, bidding, andconstruction phase professional services.
Project includes widening both Raider Way and E. Woodview to a width of 47’of pavement with curb, gutter, storm sewer, street lighting, utilityrelocations, water quality services, 6’ and 8’ sidewalks, turn lanes and signalmodifications at Crystal Falls Parkway.
Proposed additional scope of work for a roundabout at the intersection ofRaider Way and E. Woodview was approved by Council on February 16, 2017,bringing the design fee to a total of $893,360.
60% plans have been reviewed and comments issued.
90% plan submission is pending the out come of negotiations with LISD fora detention & water quality pond site on unused property in front of WileyMiddle School adjacent to Raider Way.
47
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
E. San Gabriel Parkway
Under design by Freese and Nichols at acontract price of $565,473.56 with designapproximately 50% complete.
Negotiations are underway with Palmera Bluffand Palmera Ridge to agree on constructionfunding for the full four lane section within theextents of Palmera Bluff and Palmera Ridge.
Construction funding in future bond sale. Design is expected to be complete by November
2017.
49
BOND PROJECTS - TRANSPORTATION CITY ENGINEER
East Street
Currently in design by M&S Engineering with a totaldesign cost of $565,661.
Design includes two lane roadway from Evans Street toHero Way with curb, gutter, storm sewers , water line,wastewater line, elimination of wastewater lift station,hydraulic modeling, floodplain modifications, standardTxDOT bridge over the South Fork of Brushy Creek, andsidewalks.
Design is approximately 50% complete with completionestimated December of 2017. Construction funding infuture bond sale.
51
BOND PROJECTS – TRANSPORTATION CITY ENGINEER Brushy Street Streetscape
Total budget $1,000,000. Project includes reconfiguration of N. Brushy St.
from South St. to Broade St. Halff Associates selected as consultant. Phase 1 conceptual design is complete. Phase 2 detailed design task order approved
2/2/17. 90% plans are under review. Metes and bounds descriptions are in
preparation for required easements identified in90% plans.
Project should be ready for bid in late August orSeptember pending easement acquisitions.
53
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Budget (Operations / Capital Projects) BACKGROUND: The General Fund Proposed Budget reflects a reduction in the tax rate of 2.0 cents from 59.90 to 57.90 cents. Our tax base before exemptions is now $4.5B - up 21% for the second year in a row. Average taxable home values have increased by 11.7% from $262,470 to $293,251. New value is approximately $459,000,000 or 10% of total tax base. Sales Taxes and building/development related fees continue to be strong. Total General Fund revenue is projected to be 10% above the current year. Utility revenues are increasing (up 16%), but we remain conservative in our estimates. In the General Fund, 18 new positions* are recommended:
MUNICIPAL COURT DEPUTY COURT CLERK-CUSTOMER SERVICE 1.00
PLANNING DEVELOPMENT SERVICES RECEPTIONIST 1.00
PLANNING PLANNING TECHNICIAN 1.00
PUBLIC WORKS NEW ASSISTANT PW DIRECTOR/PROJ MGR 1.00
PUBLIC WORKS STREET/DRAINAGE MAINT. POSITION 1.00
PARKS & RECREATION GREENWAY/TRAILS MAINTENANCE TECH 2.00
PARKS & RECREATION PARKS & RECREATION MANAGER 1.00 POLICE - UNIFORM SERVICES PATROL OFFICERS 4.00
POLICE - UNIFORM SERVICES TRAFFIC/K9 OFFICER 1.00
POLICE - UNIFORM SERVICES UNIFORM DIV LIEUTENANT 1.00
POLICE - SUPPORT SERVICES
PROFESSIONAL STANDARDS CORPORAL 1.00
POLICE - CID EVIDENCE SUPERVISOR 1.00 FIRE -PREPAREDNESS & WELLNESS EMERGENCY PLANNING SPECIALIST 1.00
FIRE - EMERGENCY LOGISTICS OFFICER 1.00
54
OPERATIONS GENERAL FUND TOTAL 18.00
* Note - not listed above are five positions that were approved after the start of the current fiscal year tokeep up with the continued rapid pace of development (construction inspector, building inspector andplan reviewer, fire administrative assistant and fire inspector.) The roadway maintenance budget isincreased by 29% from $1,166,675 to $1,503,405. Funds are included for the continuation of the fiberoptic infrastructure build out, a new telephone system, replacement of public safety radios, Old TownMaster Plan and Architectural Standards guidebook, and Public Safety communications technologyconsultant.
In the Utility Fund 3 new positions are requested.
WATER MAINTENANCE WATER SYSTEM OPERATOR 1.00 REGIONAL WATER OPERATOR-IN-TRAINING 1.00 WASTEWATER MAINTENANCE
PUMP & MOTOR MECHANIC NEW POSITION 1.00
UTILITY FUND TOTAL 3.00
In the Golf Course, the budget reflects the reduction of one part-time greenskeeper, one full-time position in the pro shop and overall the budget is balanced between expected revenues vs. expenditures.
Much of the remainder of the budget reflects the continuation and completion of numerous CIP projects – both City and developer-driven.
PREPARED BY: Robert G. Powers, Finance Director
55
BUDGET CALENDAR FY 2017-18
Tuesday August 1 City Manager Proposed Budget Due to City Council Thursday August 3 Regular City Council Meeting Discuss Proposed Tax Rate; Schedule 2 Public Hearings Thursday August 10 Publish Notice of Public Hearings (Hill Country News) Thursday August 17 Regular City Council Meeting Hold First Public Hearing Thursday August 24 Special Called City Council Meeting Hold Second Public Hearing Thursday August 31 Publish Notice of Vote on Tax Rate (Hill Country News) Thursday September 7 Regular City Council Meeting Vote on Adoption of FY 2017-18 Budget Vote on First Reading to Adopt Tax Rate Thursday September 14 Special Called Council Meeting Vote on Second Reading to Adopt Tax Rate
56
$0.000 $0.250 $0.500 $0.750 $1.000 $1.250 $1.500 $1.750 $2.000 $2.250 $2.500 $2.750 $3.000 $3.250 $3.500 $3.750 $4.000 $4.250 $4.500 $4.750
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18
Series1 1,364,153,015 1,583,083,441 1,646,994,824 1,690,380,593 1,756,754,642 1,890,348,854 2,051,454,926 2,484,771,355 3,115,926,537 3,776,523,206 4,570,369,660
Bill
ion
s
PROPERTY TAX BASE 21% increase Projected
57
0.000
0.500
1.000
1.500
2.000
2.500
3.000
3.500
4.000
4.500
5.000
Wms Travis Combined
0.377
0.082
0.459
Bill
ion
s
Tax Base Existing & New Value (+21%)
Existing Total-New
58
0
50,000
100,000
150,000
200,000
250,000
300,000
350,000
400,000
450,000
500,000
Williamson Travis Combined Wt. Avg.
254,809
481,032
284,795
229,854
465,444
262,471
2017 Average Taxable Home Value Within Leander by County
2017 2016
59
0.00 2.50 5.00 7.50
10.00 12.50 15.00 17.50 20.00 22.50 25.00 27.50 30.00 32.50 35.00 37.50 40.00 42.50 45.00 47.50 50.00 52.50 55.00 57.50 60.00 62.50 65.00 67.50
2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Tax
Rat
e C
en
ts p
er
$1
00
City of Leander Historical Tax Rates
I&S
M&O
60
2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Series1 1,617,360 1,743,161 1,948,789 2,029,703 2,181,537 2,586,122 2,957,311 3,443,493 4,132,318 4,520,000
$0.00
$0.50
$1.00
$1.50
$2.00
$2.50
$3.00
$3.50
$4.00
$4.50
$5.00
Mill
ion
s
Sales Tax History Receipts & Percent Change
$ Tax Receipts
61
2016 Census FT EmployeesCity Population Employees Per 1,000 Pop.
Hutto 23,832 98 4.11 No FD
Missouri City 74,561 334 4.48 Utilities
contracted
Kyle 39,060 179 4.58 No FD
Pflugerville 59,245 319 5.38 No FD
Leander 42,761 241 5.64 would go to 6.1
if 20 are added
Pearland 113,570 647 5.70 Rowlett 61,999 363 5.85 Rockwall 43,586 262 6.01 Cedar Park 68,918 423 6.14 Keller 46,646 291 6.24 Wylie 47,701 304 6.37 Cedar Hill 48,343 331 6.85 Lakeway 14,641 105 7.17 No FD
Round Rock 120,892 884 7.31 Mansfield 65,631 497 7.57 Flower Mound 73,547 566 7.70 New Braunfels 73,959 579 7.83 +Elec. Ut.
Sugarland 88,177 705 8.00 Schertz 39,453 317 8.03 Georgetown 67,140 630 9.38 +Elec. Ut.
Sources:
FT Employees - 2016 TMRS CAFR, all employees working over 1000 hours.
Population - US Census Bureau 7/1/2016
Benchmark CitiesEmployees per 1,000 Population
2017
62
POSITION SUMMARY
General Fund Department / Position 2017 2018 Department / Position 2017 2018
City Manager's Office Planning City Manager 1 1 Assistant City Manager 1 1
Total 1.0 1.0 Planning Manager 1 1 Senior Planner 0 1
City Secretary Planner 1 0 City Secretary 1 1 Assistant Planner 1 1 Deputy City Secretary 1 1 Planning Coordinator 1 1
Total 2.0 2.0 Planning Technician 0 1 Receptionist 0 1
Finance Total 5.0 7.0 Finance Director 1 1 Accounting Manager 1 1 Public Works – Streets Senior Accountant 1 1 Public Works Director 1 1 Accounting Clerk 1 1 Project Manager 0 1 Payroll Clerk (contract) * * Street Superintendent 0 1
Total 4.0 4.0 Street Supervisor 1 0 Administrative Assistant 1 1
Public Information Office Maintenance II/Crew Leader 6 6 Public Information Officer 1 1 Maintenance I 7 8
Total 1.0 1.0 Mechanic 1 1 Total 17.0 19.0
Economic Development Economic Development Director 1 1 Engineering Economic Development Manager 1 1 Engineering Director 1 1
Total 2.0 2.0 Assistant City Engineer 1 1 Engineer 2 2
Human Resources GIS Coordinator 1 1 Human Resources Director 1 1 GIS Analyst 1 1 HR Manager 1 1 Stormwater Inspector 1 1
Total 2.0 2.0 Construction Inspector 4 5 Administrative Assistant 1 1 Total 12.0 13.0
Information Technology Information Technology Manager 1 1 Parks & Recreation Public Safety Systems Admin. 1 1 Parks & Recreation Director 1 1 Help Desk Specialist 1 1 Maintenance Supervisor 1 1
Total 3.0 3.0 Parks & Recreation Manager 0 1 Recreation Supervisor 1 1
Municipal Court Program Coordinator-Athletics 1 1 Court Administrator 1 1 Administrative Assistant 1 1 Assistant Court Administrator 1 1 Maintenance II / Crew Leader 3 3 Juvenile Case Manager 1 1 Maintenance I/Parks 7 9 Senior Deputy Court Clerk 1 1 Facilities Operation (Part-time) 0 0.4 Deputy Court Clerk - Customer Svc. 0 1 Bailiff (PT) 0.5 0 Total 15.0 18.4
Total 4.5 5.0 Police
General Services Administration General Services/Purchasing Mgr. 1 1 Chief of Police 1 1 Facilities Maintenance Crew Leader 1 1 Assistant Chief of Police 1 1 Facilities Maintenance I 1 1 Administrative Office Manager 1 0 Janitorial Services II 1 1 Administrative Assistant 1 1 Janitorial Services I1 1 1 Administrative Assistant/Records 1 0
Total 5.0 5.0 Sub-total 5.0 3.0
63
POSITION SUMMARY
General Fund (cont’d) Department / Position 2017 2018 Department / Position 2017 2018
Police (cont'd) Fire (cont’d) Uniform Services Preparedness & Wellness
Lieutenant 1 2 Assistant Chief / EMC 1 1 Sergeant 5 5 Admin Battalion Chief 0 0 Officer 20 24 Training Officer 1 1 Warrant Officer 1 1 Training Instructor 1 1 Corporal 4 4 Wellness Coordinator 0 0.5 Traffic/K-9 Officer 0 1 Emergency Planning Specialist 0 1
Sub-total 31.0 37.0 Total 3.0 4.5
Support Services Prevention & Life Safety Lieutenant 1 1 Fire Marshal 1 1 Sergeant 3 3 Fire Inspector III 0 1 Officer III - Community Services 1 1 Fire Inspector II 2 1 Professional Standards-Corporal 0 1 Fire Inspector I 1 1 School Resource Officer/Sgt 1 1 Fire Plan Reviewer 0 1 School Resource Officer 4 4 Fire Inspector (PT) 0 0
Sub-total 10.0 11.0 Total 4.0 5.0
Animal Control Emergency Operations Animal Services Supervisor 1 1 Assistant Fire Chief 1 1 Animal Services Officer I 2 2 Battalion Chief 3 3
Sub-total 3.0 3.0 Lieutenant 12 12 Driver / Pump Operator 12 12
Criminal Investigations Firefighter 18 18 Lieutenant 1 1 Logistics Officer 0.5 1 Sergeant/CID 2 2 Total 46.5 47.0 Officer III/Corp 3 3 Evidence Supervisor 0 1 Fire Department Total 56.5 60.5 Victim Services Coordinator 1 1 Crime Scene Specialist 1 1
Sub-total 8.0 9.0 Building Inspections Building Official 1 1
Communications Chief Building Inspector 1 1 Communications & Records Mgr 1 1 Senior Inspector 4 4 TCO Supervisor 2 2 Building Inspector 0 1 Telecommunications Officer 7 7 Plan Reviewer 2 2 Records Supervisor 0 1 Permits Clerk 1 1 Administrative Assistant 0 1 Zoning Compliance Officer 1 2
Sub-total 10.0 12.0 Permit Technician 1 2 Receptionist 1 0
Police Department Total 67.0 75.0 Total 12.0 14.0
Fire Administration Code Enforcement
Fire Chief 1 1 Senior Code Enforcement Officer 1 1 Administrative Assistant 1 2 Code Enforcement Officer 1 1 Volunteer Coordinator 1 0 Total 2.0 2.0 Outreach Coordinator 0 1
Total 3.0 4.0 GENERAL FUND TOTAL 211.0 233.9
64
POSITION SUMMARY
Golf Fund Department / Position 2017 2018 Department / Position 2017 2018
Grounds Maintenance Pro Shop Golf Course Superintendent 1 1 General Manager 1 1 Assistant Course Superintendent 1 1 Head Golf Pro 1 1 Greenskeeper I 3.5 3 Assistant Golf Pro 1 1 Mechanic – Golf Maintenance 1 1 Pro Shop Attendant 2.5 2
Total 6.5 6.0 Cart Attendant 2.5 2.75 Total 8.0 7.75
Grill Grill Manager 1 1 Grill Attendant 2.1 2
Total 3.1 3.0 GOLF FUND TOTAL 17.6 16.75
Utility Fund
Department / Position 2017 2018 Department / Position 2017 2018
Utility Billing Wastewater Maintenance Utility Billing Manager 1 1 Public Works Superintendent 0.5 0.5 Utility Billing Supervisor 1 1 Water & Wastewater Supt. 0.5 0 Billing Assistant 1 1 Utility Operations Supervisor 0.5 0.5 Customer Service Supervisor 1 1 Administrative Assistant 0 0.5 Utility Clerk 3 3 Wastewater Plant Operator 6 6 Meter Operations Supervisor 1 1 Pump & Motor Mechanic 0 1 Meter Reader 3 3 Crew Leander I 1.5 1.5 Field Technician 1 1 Utility Maintenance I 1.5 1.5
Total 12.0 12.0 W/WW Service Tech 1 1 Total 11.5 12.5
Water Maintenance Regional Water Plant Public Works Superintendent 0.5 0.5 Superintendent 1 1 Water & Wastewater Supt. 0.5 0 Water Plant Operators 7 6 Utility Operations Supervisor 0.5 0.5 Water Plant Operators-In-Training 0 2 Water System Operator 0 1 Total 8.0 9.0 Administrative Assistant 0 0.5 Crew Leader 1.5 1.5 Utility Maintenance I 1.5 1.5 W/WW Service Tech 1 1
Total 5.5 6.5 UTILITY FUND TOTAL 37.0 40.0
ALL FUNDS GRAND TOTAL 265.6 290.65
65
FY 2017-18
PROPOSED VS. REQUESTED BUDGET
SUPPLEMENTS
PRELIM APPROVED - NON-RECURRING
GENERAL FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 NEW FTE
01-09 GENERAL FUND HUMAN RESOURCES HUMAN RESOURCES NON-RECURRING (ONE-TIME ONLY) EMPLOYEE RELATIONS SEMINAR FOR LEADERS 12,000
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY NON-RECURRING (ONE-TIME ONLY) 12 MDC REPLACEMENT FOR PD 40,800
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY NON-RECURRING (ONE-TIME ONLY) CITY WIDE DOOR ACCESS SYSTEM 68,650
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY NON-RECURRING (ONE-TIME ONLY) CITY WIDE TELEPHONE REPLACEMENT 250,000
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY NON-RECURRING (ONE-TIME ONLY) GOLF COURSE PCI COMPLIANCE 16,328
01-20 GENERAL FUNDPLANNING & DEVELOPMENT
SERVICES
PLANNING & DEVELOPMENT
SERVICESNON-RECURRING (ONE-TIME ONLY)
P&Z RECOMMENDATIONS - OLD TOWN MASTER
PLAN; ARCHITECTURAL STNDS BOOK100,000
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY) NEW FUEL TANKS WITH PUMP SYSTEM 24,000
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY)REPL AIR-BRAKE EQUIPPED EQUIPMENT HAUL
TRAILER 17,500
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY) REPL CRACKSEAL TRAILER 65,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) BLEDSOE - SYN TURF MAINTENANCE EQUIPMENT 50,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) BLEDSOE PARK - POOL CABANAS - SHADE COVER 15,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) CHRISTMAS DISPLAYS 10,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) GATOR - ATV 10,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) PARKS OFFICE - PARKING LOT UPGRADE 20,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) SENIOR BUS - NEW 65,000
01-40 GENERAL FUND POLICE POLICE ADMINISTRATION NON-RECURRING (ONE-TIME ONLY) CID DOOR SECURITY PROPOSAL 10,300
01-40 GENERAL FUND POLICE POLICE ADMINISTRATION NON-RECURRING (ONE-TIME ONLY) SUNGARD - FIELD TRAINING ONLINE 22,820
01-40 GENERAL FUND POLICE POLICE ADMINISTRATION NON-RECURRING (ONE-TIME ONLY) SUNGARD IA MODULE 13,628
01-41 GENERAL FUND POLICE UNIFORM SERVICES NON-RECURRING (ONE-TIME ONLY) TRAFFIC RADAR/DATA TRAILER 16,000
01-42 GENERAL FUND POLICE SUPPORT SERVICES NON-RECURRING (ONE-TIME ONLY) RADIO REPLACEMENT PROGRAM 97,000
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS NON-RECURRING (ONE-TIME ONLY) BLUE CARD CERTIFICATION TRAINING 66,695
01-50 GENERAL FUND FIRE FIRE ADMINISTRATION NON-RECURRING (ONE-TIME ONLY)CONSULTANT FOR COMM CENTER AND TECHNOLOGY
REVIEW100,000
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) PORTABLE RADIO UPGRADES 171,716
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) EQUIPMENT FD022 BRUSH 2 (67) 27,030
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) EQUIPMENT FD082 TRAINING 1 (ID 91) 16,247
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) TRENCH RESCUE AND RESPONSE EQUIPMENT 38,173
PRELIM APPROVED - NON-RECURRING 1,343,887
66
FY 2017-18
PROPOSED VS. REQUESTED BUDGET
SUPPLEMENTS
PRELIM APPROVED - RECURRING
GENERAL FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 FTE
01-06 GENERAL FUND LIBRARY LIBRARY RECURRING (MULTI-YEAR IMPACT) LIBRARY STAFF MEMBERS (1) 15,000
01-11 GENERAL FUND MUNICIPAL COURT MUNICIPAL COURT RECURRING (MULTI-YEAR IMPACT) DEPUTY COURT CLERK-CUSTOMER SERVICE 40,634 1.00
01-20 GENERAL FUNDPLANNING & DEVELOPMENT
SERVICES
PLANNING & DEVELOPMENT
SERVICESRECURRING (MULTI-YEAR IMPACT) DEVELOPMENT SERVICES RECEPTIONIST 46,582 1.00
01-20 GENERAL FUNDPLANNING & DEVELOPMENT
SERVICES
PLANNING & DEVELOPMENT
SERVICESRECURRING (MULTI-YEAR IMPACT) PLANNING TECHNICIAN 55,690 1.00
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS RECURRING (MULTI-YEAR IMPACT) PROJECT MANAGER 143,900 1.00
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS RECURRING (MULTI-YEAR IMPACT) STREET/DRAINAGE MAINT. POSITION 44,202 1.00
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION RECURRING (MULTI-YEAR IMPACT) GREENWAY/TRAIL MAINTENANCE TECH 39,728 1.00
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION RECURRING (MULTI-YEAR IMPACT) GREENWAY/TRAILS MAINTENANCE TECH 39,728 1.00
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION RECURRING (MULTI-YEAR IMPACT) PARKS & RECREATION MANAGER 84,450 1.00
01-41 GENERAL FUND POLICE UNIFORM SERVICES RECURRING (MULTI-YEAR IMPACT) PATROL OFFICER X 4 610,590 4.00
01-41 GENERAL FUND POLICE UNIFORM SERVICES RECURRING (MULTI-YEAR IMPACT) TRAFFIC/K9 OFFICER 179,072 1.00
01-41 GENERAL FUND POLICE UNIFORM SERVICES RECURRING (MULTI-YEAR IMPACT) UNIFORM DIV LIEUTENANT 171,279 1.00
01-42 GENERAL FUND POLICE SUPPORT SERVICES RECURRING (MULTI-YEAR IMPACT) PROFESSIONAL STANDARDS CORPORAL 120,827 1.00
01-44 GENERAL FUND POLICE CRIMINAL INVESTIGATION RECURRING (MULTI-YEAR IMPACT) EVIDENCE SUPERVISOR 143,879 1.00
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS RECURRING (MULTI-YEAR IMPACT) EMERGENCY PLANNING SPECIALIST 103,918 1.00
01-50 GENERAL FUND FIRE FIRE ADMINISTRATION RECURRING (MULTI-YEAR IMPACT) EMS SERVICE AGREEMENT 195,000
01-50 GENERAL FUND FIRE FIRE ADMINISTRATION RECURRING (MULTI-YEAR IMPACT) FIRE DISPATCH AND COMMUNICATION SERVICES 150,000
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS RECURRING (MULTI-YEAR IMPACT) LOGISTICS OFFICER 57,195 1.00
PRELIM APPROVED - RECURRING 2,241,674 18.00
PRELIM APPROVED - NON-RECURRING
UTILITY FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 FTE
20-02 UTILITY FUND PUBLIC WORKS WATER MAINTENANCE NON-RECURRING (ONE-TIME ONLY) NEW DUMP TRUCK 8YD 100,000
20-03 UTILITY FUND PUBLIC WORKSWASTEWATER
MAINTENANCENON-RECURRING (ONE-TIME ONLY) NETWORK/SCADA CONTROL WWTP EQUIPMENT 28,000
PRELIM APPROVED - NON-RECURRING 128,000
67
FY 2017-18
PROPOSED VS. REQUESTED BUDGET
SUPPLEMENTS
PRELIM APPROVED - RECURRING
UTILITY FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 FTE
20-02 UTILITY FUND PUBLIC WORKS WATER MAINTENANCE RECURRING (MULTI-YEAR IMPACT) WATER SYSTEM OPERATOR 87,628 1.00
20-05 UTILITY FUND REGIONAL WATER PLANT REGIONAL WATER RECURRING (MULTI-YEAR IMPACT) OPERATOR-IN-TRAINING 52,210 1.00
20-03 UTILITY FUND PUBLIC WORKSWASTEWATER
MAINTENANCERECURRING (MULTI-YEAR IMPACT) PUMP & MOTOR MECHANIC NEW POSITION 180,128 1.00
PRELIM APPROVED - RECURRING 319,966 3.00
NOT APPROVED
GENERAL FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 FTE
01-09 GENERAL FUND HUMAN RESOURCES HUMAN RESOURCES RECURRING (MULTI-YEAR IMPACT) PROPOSED SELF-FUNDING HEALTH INS. 260,000
01-09 GENERAL FUND HUMAN RESOURCES HUMAN RESOURCES RECURRING (MULTI-YEAR IMPACT) PROGRAM MANAGER 64,150 1.00
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY RECURRING (MULTI-YEAR IMPACT) EIQ PATCH MANAGEMENT 16,586
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY NON-RECURRING (ONE-TIME ONLY) GENERATOR FOR SERVER ROOM AT CITY HALL 27,298
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY RECURRING (MULTI-YEAR IMPACT) SECURITY DEVICE MONITORING (ALBERT) 13,440
01-10 GENERAL FUND INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY RECURRING (MULTI-YEAR IMPACT) SYSTEMS ADMINISTRATOR 89,680 1.00
01-13 GENERAL FUND FINANCE GENERAL SERVICES RECURRING (MULTI-YEAR IMPACT) ASSISTANT PURCHASING AGENT 61,655 1.00
01-13 GENERAL FUND FINANCE GENERAL SERVICES RECURRING (MULTI-YEAR IMPACT) COMMERCIAL CLEANING SERVICES 22,000
01-13 GENERAL FUND FINANCE GENERAL SERVICES NON-RECURRING (ONE-TIME ONLY) FACILITY MAINTENANCE LIFE-CYCLE CONSULTANT 25,000
01-13 GENERAL FUND FINANCE GENERAL SERVICES NON-RECURRING (ONE-TIME ONLY) FACILITY MAINTENANCE SECOND TRUCK 30,000
01-13 GENERAL FUND FINANCE GENERAL SERVICES RECURRING (MULTI-YEAR IMPACT) JANITORIAL MAINTENANCE I 37,120 1.00
01-20 GENERAL FUNDPLANNING & DEVELOPMENT
SERVICES
PLANNING & DEVELOPMENT
SERVICESNON-RECURRING (ONE-TIME ONLY) CODE UPDATES 150,000
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY) CR 290 CONSTRUCTION 285,000
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS RECURRING (MULTI-YEAR IMPACT) MECHANIC - NEW POSITION 58,130 1.00
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY) NEW STREET SWEEPER/ OPERATOR POSITION 285,852 1.00
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS NON-RECURRING (ONE-TIME ONLY) PAVEMENT MGMT STUDIES 80,000
01-21 GENERAL FUND PUBLIC WORKS PUBLIC WORKS RECURRING (MULTI-YEAR IMPACT) SIGN MAINT. I NEW POSITION 48,123 1.00
01-22 GENERAL FUND ENGINEERING ENGINEERING RECURRING (MULTI-YEAR IMPACT) RECORDS CLERK - ENGINEERING 42,277 1.00
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) BUCKET TRUCK 35,000
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION RECURRING (MULTI-YEAR IMPACT) SPECIAL EVENT SPECIALIST 58,803 1.00
01-23 GENERAL FUND PARKS & RECREATION PARKS & RECREATION NON-RECURRING (ONE-TIME ONLY) VETERANS PARK - PRACTICE FIELD PREP 18,500
68
FY 2017-18
PROPOSED VS. REQUESTED BUDGET
SUPPLEMENTS
NOT APPROVED
GENERAL FUND
01-40 GENERAL FUND POLICE POLICE ADMINISTRATION NON-RECURRING (ONE-TIME ONLY) PD BUILDING BUILD OUT - DESIGN & ENGINEERING 200,000
01-41 GENERAL FUND POLICE UNIFORM SERVICES NON-RECURRING (ONE-TIME ONLY) BEARCAT ARMORED VEHICLE 271,137
01-41 GENERAL FUND POLICE UNIFORM SERVICES RECURRING (MULTI-YEAR IMPACT) WARRANT OFFICER 155,263 1.00
01-42 GENERAL FUND POLICE SUPPORT SERVICES NON-RECURRING (ONE-TIME ONLY) C.O.P. VEHICLE 32,685
01-42 GENERAL FUND POLICE SUPPORT SERVICES RECURRING (MULTI-YEAR IMPACT) SCHOOL RESOURCE OFFICER 150,354 1.00
01-44 GENERAL FUND POLICE CRIMINAL INVESTIGATION RECURRING (MULTI-YEAR IMPACT) TWO CORPORAL DETECTIVES 250,878 2.00
01-45 GENERAL FUND POLICE COMMUNICATIONS RECURRING (MULTI-YEAR IMPACT) FRONT DESK CLERK/RECEPTIONIST 43,520 1.00
01-45 GENERAL FUND POLICE COMMUNICATIONS RECURRING (MULTI-YEAR IMPACT) TELECOMMUNICATIONS OFFICER 53,413 1.00
01-48 GENERAL FUND CODE ENFORCEMENT CODE ENFORCEMENT RECURRING (MULTI-YEAR IMPACT) NEW CODE ENFORCEMENT SUPERVISOR 121,102 1.00
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS NON-RECURRING (ONE-TIME ONLY) CAMERA WITH WEATHER STATION 11,000
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS RECURRING (MULTI-YEAR IMPACT)CONSULTANT FOR PLAN MAINTENANCE AND
REPORTING110,000
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS NON-RECURRING (ONE-TIME ONLY) EOC HARDWARE UPGRADE 135,000
01-49 GENERAL FUND FIRE PREPAREDNESS & WELLNESS NON-RECURRING (ONE-TIME ONLY) WOOD CHIPPER 4 1/2 PTO 16,000
01-53 GENERAL FUND NON-DEPARTMENTAL NON-DEPARTMENTAL NON-RECURRING (ONE-TIME ONLY) CITY HALL FACELIFT AND OFFICE REMODEL 30,000
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) BALLISTIC VEST AND HELMETS 52,780
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) LOGISTICS OFFICER VEHICLE 30,000
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) RESCUE BOAT REPLACEMENT 29,000
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) UTV AND TRAILER 66,200
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) WILDLAND TEAM EQUIPMENT 15,100
01-55 GENERAL FUND FIRE EMERGENCY OPERATIONS NON-RECURRING (ONE-TIME ONLY) WIRELESS HEADSET SYSTEMS 30,250
01-56 GENERAL FUND FIREPREVENTION AND LIFE
SAFETYNON-RECURRING (ONE-TIME ONLY) BODY CAMERA P&LS 11,015
NOT APPROVED - GENERAL FUND 3,523,310 16.00
69
FY 2017-18
PROPOSED VS. REQUESTED BUDGET
SUPPLEMENTS
NOT APPROVED
UTILITY FUND
ORGUNIT FUND DEPARTMENT DEPTDIV TYPE TITLE 2018 FTE
20-02 UTILITY FUND PUBLIC WORKS WATER MAINTENANCE NON-RECURRING (ONE-TIME ONLY) EQUIPMENT HOUSING 45,000
20-02 UTILITY FUND PUBLIC WORKS WATER MAINTENANCE NON-RECURRING (ONE-TIME ONLY) TWO NEW MESSAGE BOARDS 34,000
20-03 UTILITY FUND PUBLIC WORKSWASTEWATER
MAINTENANCENON-RECURRING (ONE-TIME ONLY)
WW.19 EAGLES WAY TOPAZ MICAH WW SVCS & STR
REPAVE1,200,000
NOT APPROVED - UTILITY FUND 1,279,000
70
FY 2017-18
CAPITAL IMPROVEMENTS PROGRAM
Estimated
Project Description Total Cost Prior FY 17-18 FY 18-19 FY 19-20 FY 20-21 FY 21-22 Future TOTAL
PARKS & RECREATION
E. Crystal Falls Pwy Median Landscaping 610,000 33,445 576,555 - - - - - 610,000
Bledsoe Park Synthetic Turf Fields 1,901,000 127,000 1,774,000 - - - - - 1,901,000
Mason Creek Trail 569,000 - 569,000 - - - - - 569,000
Lakewood Community Park 7,275,000 - 2,465,000 4,810,000 - - - - 7,275,000
Veterans Park 1,465,000 27,046 572,954 865,000 - - - - 1,465,000
Senior Center 4,185,000 - 500,000 3,685,000 - - - - 4,185,000
Bledsoe Parking Lot Addition 400,000 - 50,000 350,000 - - - - 400,000
Mel Mathis Park - Across from ACC 525,000 - - 25,000 500,000 - - - 525,000
Brushy Creek Trail (Hero Way Spur) 432,000 - 65,000 367,000 - - - - 432,000
Sarita Valley Trail Head Parking Site/Dev. 250,000 - - 250,000 - - - - 250,000
Benbrook Ranch Park Improvements 300,000 - - 300,000 - - - - 300,000
Acquisition of Mason Property 2,200,000 - 440,000 440,000 440,000 440,000 440,000 - 2,200,000
Crystal Springs Parkland Acquisition 250,000 - - 250,000 - - - - 250,000
Recreation Center 18,000,000 - - 1,800,000 - 16,200,000 - - 18,000,000
Benbrook Ranch Park Baseball Field 400,000 - 400,000 - - - - - 400,000
McGraw Tract Property 800,000 - - - - - 50,000 750,000 800,000
S. San Gabriel River Trail 1,524,000 - - - - - - 1,524,000 1,524,000
S. San Gabriel River Park 10,400,000 - - - - - - 10,400,000 10,400,000
Brushy Creek Trail (183A-Reagan) 3,199,000 - - - - - - 3,199,000 3,199,000
TOTAL PARKS & RECREATION PROJECTS 54,685,000 187,491 7,412,509 13,142,000 940,000 16,640,000 490,000 15,873,000 54,685,000
TRANSPORTATION
Metro Drive Extension & Pedestrian Signal 6,105,805 590,632 5,515,173 - - - - - 6,105,805
North Brushy Street Streetscape 1,000,000 140,455 859,545 - - - - - 1,000,000
Bagdad (N) Street Improvements 9,335,181 4,044,015 5,291,166 - - - - - 9,335,181
Old 2243 West/Hero Way 26,685,006 25,685,006 1,000,000 - - - - - 26,685,006
Mahendru TIRZ - Infrastructure 3,060,000 - 3,060,000 - - - - - 3,060,000
West Drive Sidewalk Improvements 244,610 - 244,610 - - - - - 244,610
Reagan Blvd Rt Turn Lane @ Journey Pkwy 170,860 - 170,860 - - - - - 170,860
CR290/Nameless Rd Intersection Improv. 285,000 - - 285,000 - - - - 285,000
Northbound Lakeline Access Road Project 336,634 136,634 200,000 - - - - - 336,634
Railroad Quiet Zones 5,000,000 - 1,000,000 1,000,000 3,000,000 - - - 5,000,000
San Gabriel Parkway Design & Extension 4,729,935 365,000 200,000 4,164,935 - - - - 4,729,935
Raider Way & Woodview Dr. Roadway Improv. 7,864,195 400,000 1,464,195 6,000,000 - - - - 7,864,195
San Gabriel Parkway TOD 350,000 - - - - - 350,000 - 350,000
East Street Roadway Project 3,223,617 126,500 466,500 2,630,617 - - - - 3,223,617
W. South & S. West Street Intersection Imp. 704,940 - - 704,940 - - - - 704,940
Reagan Blvd Rt Turn Lane @ Crystal Falls Pkwy 170,860 - 170,860 - - - - - 170,860
Leander Dr Rt Turn Lane @ Crystal Falls Pkwy 140,860 - 140,860 - - - - - 140,860
San Gabriel Parkway Right Turn Lane at 183 170,860 - - 170,860 - - - - 170,860
Hazelwood Intersection Improvements 140,860 - - 140,860 - - - - 140,860
County Road 280 Reconstruction 1,104,000 - - 144,000 960,000 - - - 1,104,000
CR 177 Low Water Crossing Replacement 475,700 - - - 475,700 - - - 475,700
Roundabout @ Journey/CR175 1,442,258 - - - 1,442,258 - - - 1,442,258
West Drive Intersection Improvements 300,000 - - - 300,000 - - - 300,000
Lakeline Widening 3,960,000 - - - - 594,000 3,366,000 - 3,960,000
Pedestrian Crossing Signals & Crossings Journey Pwy 300,000 - - 300,000 - - - - 300,000
TOTAL TRANSPORTATION 77,301,181 31,488,242 19,783,769 15,541,212 6,177,958 594,000 3,716,000 - 77,301,181
71
FY 2017-18
CAPITAL IMPROVEMENTS PROGRAM
Estimated
Project Description Total Cost Prior FY 17-18 FY 18-19 FY 19-20 FY 20-21 FY 21-22 Future TOTAL
STORMWATER
Existing Mel Mathis Pond 300,000 - 300,000 - - - - - 300,000
St. Davids Water Quality Detention Ponds TBD - - - - - - TBD -
TOTAL STORMWATER 300,000 - 300,000 - - - - - 300,000
MUNICIPAL FACILITIES
Pat Bryson Remodel 2,200,000 200,000 2,000,000 - - - - - 2,200,000
Fire Station # 1 Relocation 5,206,799 338,299 4,868,500 - - - - - 5,206,799
Regional Animal Shelter - design & construction 940,724 475,000 465,724 - - - - - 940,724
Microwave Tower / Dispatch MCC 7500 669,975 - 669,975 - - - - - 669,975
Police Parking Lot 350,000 - 350,000 - - - - - 350,000
Police Station Renovation 1,700,000 - - - 200,000 1,500,000 - - 1,700,000
Fire Station # 5 (Including EMS & Police Sub-Stat.) 5,454,250 - - 2,815,500 2,638,750 - - - 5,454,250
Fire Station # 5 - Fire Engine 861,264 - - 680,000 181,264 - - - 861,264
Fire Station # 6 (Including EMS & Police Sub-Stat.) 5,483,500 - - - - 5,483,500 - - 5,483,500
Fire Station # 6 - Fire Engine 861,264 - - - - 861,264 - - 861,264
Fire Station #4 3,875,589 2,269,063 1,606,526 - - # - - - 3,875,589
TOTAL MUNICPAL FACILITIES & EQUIPMENT 27,603,365 3,282,362 9,960,725 3,495,500 3,020,014 7,844,764 - - 27,603,365
72
2016 CO SAVINGS
DUE TO BAGDAD ROAD
BAGDAD ROAD PROJECT Surplus Proceeds => 4,753,646.69
PROPOSED USE OF SAVINGS From To Change
Mahendru TIRZ 3,000,000 3,060,000 60,000
Police Parking Lot 350,000 350,000
Public Safety Communications Tower 669,975 669,975
Journey Pkwy Ped Xing(2) 300,000 300,000
Fire Station #1 4,290,354 5,206,799 916,445
East Street 340,000 340,000
Bagdad / Design C/O 150,000 150,000
Bagdad Road C/O 12,000 12,000
Quiet Zones 200,000 200,000
Mel Mathis Pond 300,000 300,000
3,298,420
Remaining Savings 1,455,227
73
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Impact Fees
BACKGROUND: The draft Water and Wastewater Impact Fee Update is under review with a recommended maximum allowable Water Impact Fee of four thousand three hundred nine dollars and nineteen cents ($4,309.19) per LUE and maximum allowable Wastewater Impact Fee of two thousand eight hundred nineteen dollars and eighty-four cents ($2,819.84) per LUE. The attached table shows the current surrounding communities impact fees.
The Community Impact Fee Advisory Committee must consider the Water and Wastewater Impact Fee Update and make written recommendations to the City Council prior to adoption of the updated impact fees. The Advisory Committee is composed of the Planning and Zoning Commission (Commission) and must have one (1) representative from the real estate, development, or building community and one (1) representative of the City of Leander’s extraterritorial jurisdiction (ETJ). The Commission, as currently constituted, has no representative from the real estate, development, or building community and no representative of the ETJ. As a result, on April 20, 2017, City Council appointed Ms. Linda Hall as the ad hoc voting member representing the ETJ and Mr. Michael Moyer as the ad hoc voting member representing real estate, development, or building community, limited to when the Commission acts as the Advisory Committee.
The following schedule identifies action dates required for the adoption of updated water and wastewater impact fees.
DATE ACTION REQUIRED
1. April 20, 2017 Council affirmed P&Z Commission as the Advisory Committee, appointed an ETJ representative and a Real Estate, Development, or Builder representative.
2. August 3, 2017 Council authorizes a public hearing on September 21, 2017, to consider Amendment of Land Use
74
Assumptions and a Capital Improvements Plan and the imposition of an Impact Fee.
3. August 10, 2017 First publication of notice of public hearing; 31 days notice is required prior to date of public hearing on September 21, 2017. Draft Impact Fee Update Study is made available to the public on or before the first publication of notice.
4. August 24, 2017 Advisory Committee meets to consider amendingLand Use Assumptions and a Capital Improvements Plan and the imposition of an Impact Fee and files written comments with City Council no later than September 13, 2017.
5. September 21, 2017 Council meeting w/public hearing followed by consideration and action on amending Land UseAssumptions and Capital Improvements Plan and the imposition of an Impact Fee.
FINANCIAL CONSIDERATION: TBD
ATTACHMENTS: 1. Sample Public Hearing Notice2. Surrounding Communities’ Impact Fees3. Draft Water and Wastewater Impact Fee Update Study
PREPARED BY: Wayne S. Watts, P.E., CFM, City Engineer
75
NOTICE OF PUBLIC HEARING ON AMENDMENT OF IMPACT FEES
A Public Hearing will be held during the regularly scheduled City Council Meeting on Thursday, September 21, 2017, at 7:00 p.m. in the Council Chambers of the Pat Bryson Municipal Hall located at 201 N. Brushy Street in Leander, Texas. For directions, or questions regarding the hearing, please contact the City Secretary's Office at (512) 528-2743. The purpose of this public hearing is to consider the amendment of land use assumptions and a capital improvements plan and the imposition of an impact fee. Any member of the public has the right to appear at the hearing and present evidence for or against the update.
76
Surrounding Communities’ Impact Fees
City Water Wastewater Total Comments Austin - All Zones $5,400 $2,200 $7,600 Buda $2,187 $2,531 $4,718 3/4", 5/8" meter equals 1 LUE Cedar Park $2,250 $2,000 $4,250 3/4-inch meter equals 1 LUE Current Georgetown $6,139* $2,997 $9,136 3/4-inch meter equals 1 LUE Current Georgetown - South Fork Basin $6,139* $4,452 $10,591 3/4-inch meter equals 1 LUE Leander current $3,880 $1,615 $5,495 5/8" meter equals 1 LUE** Pflugerville $4,241 $2,725 $6,966 5/8" meter equals 1 LUE Hutto $3,625 $2,128 $5,753 Round Rock $4,025 $2,099 $6,124 5/8" meter equals 1 LUE
*$7,039 effective as of October 1, 2017 (a $900 increase). ** Leander’s 2017 draft Impact Fee Study Update establishes both 5/8” and 3/4” meters as equal to 1 LUE.
77
CITY OF LEANDER, TEXAS
WATER AND WASTEWATER IMPACT FEE
PREPARED FOR:
CITY OF LEANDER
PREPARED BY:
JULY 2017
78
DALE P. MURPHY, PE 90614 ON 7/14/17
CITY OF LEANDER
WATER AND WASTEWATER IMPACT FEE
Prepared For:
City of Leander
Prepared by:
K Friese & Associates, Inc.
1120 S Capital of Texas Highway CityView 2, Suite 100 Austin, Texas 78746
Firm No: F-6535
July 2017
79
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Background ................................................................................................................................................... 1 Service Area .................................................................................................................................................. 1 Land Use Assumptions ................................................................................................................................. 3 Living Unit Equivalents .................................................................................................................................. 3 Population and LUE Projections ................................................................................................................... 5 Design Criteria .............................................................................................................................................. 5 Existing Water and Wastewater System ....................................................................................................... 5 Proposed Improvements ............................................................................................................................... 8 Credit Calculation .......................................................................................................................................... 8 Maximum Allowable Impact Fees ............................................................................................................... 15
LIST OF EXHIBITS Exhibit 1: Service Area .................................................................................................................................. 2 Exhibit 2: Future Land Use Map ................................................................................................................... 4 Exhibit 3: Water System Improvements Map .............................................................................................. 11 Exhibit 4: Wastewater System Improvements Map .................................................................................... 12
LIST OF TABLES Table 1: LUE Factors .................................................................................................................................... 3 Table 2: Population and LUE Projections ..................................................................................................... 5 Table 3: Water Planning and Design Criteria ................................................................................................ 5 Table 4: Wastewater Planning and Design Criteria ...................................................................................... 5 Table 5: Previous Water Improvements ........................................................................................................ 6 Table 6: Previous Wastewater Improvements .............................................................................................. 7 Table 7: Water System Improvements .......................................................................................................... 9 Table 8: Wastewater System Improvements .............................................................................................. 10 Table 9: Credit Calculation for Water System ............................................................................................. 13 Table 10: Credit Calculation for Wastewater System ................................................................................. 14 Table 11: Impact Fee Calculation ............................................................................................................... 15
80
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Introduction K Friese + Associates (KFA) was retained by the City of Leander (City) to update the current Water and Wastewater Impact Fees as required by State Law. In general, the update calculated the maximum allowable impact fee from the proposed capital improvements plans for both the water and wastewater systems as prescribed in Chapter 395 of the Texas Local Government Code.
The City of Leander is located northwest of Austin in the vicinity of US 183 and FM 2243 in southwestern Williamson County and northwestern Travis County. Leander’s extraterritorial jurisdiction (ETJ) borders the city limits and/or ETJs of Cedar Park, Round Rock, Georgetown, Liberty Hill and Jonestown.
Background Impact fee calculations in this report were based on recent analysis by KFA for the City to project service demand and proposed capital improvements. The capacities of both existing infrastructure and proposed improvements were determined using zoning, population, current utility demand, and existing utility components information provided by the City as well as design criteria, developed by KFA and City staff. The impact fees were calculated based on the capacities and the costs to build the infrastructure.
Impact fees are calculated by adding the costs for existing infrastructure to the costs of proposed infrastructure and dividing the total by the number of living utility equivalents (LUE) served during the study time period. Only the portion of the costs attributable to development that occurs during the study time period may be included in the impact fees. Costs attributable to development either before or after the study period are not included in the impact fee calculation. The study period has been determined to be 2017 (current) to 2027.
Service Area The City of Leander service area, shown in Exhibit 1, includes the City and portions of its Extra-Territorial Jurisdiction (ETJ). The service area is defined by the Certificate of Convenience and Necessity for the City.
81
RO
NALD
REAG
AN BLVD
US H
WY 183
US HWY 183A
BAGDAD RD
EXHIBIT 1
2017 IMPACT FEE UPDATESERVICE AREA MAP
CITY OF LEANDER
0 4,400 8,8002,200Feet
qLEGEND
Rivers/Creeks/Streams
Current Sewer CCN
Current Water CCN
PARCELS_ZONE
Leander City Limits
Leander Extra Territorial Jurisdiction
82
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Land Use Assumptions The future land use map, included in Exhibit 2, developed for the Comprehensive Plan shows the service area largely consisting of residential land use. Commercial development will be largely located along major transportation corridors and within the Old Town mixed use area, located near US 183 and RM 2243 and the Employment mixed use area located on the northwest corner of Ronald Reagan Boulevard and RM 2243.
There are currently over 14,000 residential lots approved for construction within the service area. These lots are contained within 27 planned subdivisions, with approximately 60 percent located within four: Bryson, Rancho Sienna, Travisso, and Wedemeyer. The smaller subdivisions are expected to be fully developed within the next 10 years and the large subdivisions within 15 years.
The projections were determined based on the future land use map as well as current development trends. The milder slopes characteristic of the Brazos River basin in the east are conducive to more intensive development while land in the Colorado basin tends toward low density, large lot residential development.
Living Unit Equivalents A Living Unit Equivalent is the unit of measure which represents the quantity of water used and wastewater generated by a single-family detached residence. Each developed lot is applied a LUE or LUE factor, shown in Table 1, to determine water demand and wastewater generated. Using these factors, impact fees may be assessed for the different types of development.
Table 1: LUE Factors Meter Size
(inch) Meter Type LUE Factor
5/8 Positive Displacement 13/4 Positive Displacement 11 Positive Displacement 2.5
1-1/2 Positive Displacement 5
2 Positive Displacement 8
Compound 8Turbine 10
3 Compound 16Turbine 24
4 Compound 25Turbine 42
6 Compound 50Turbine 92
8 Compound 80Turbine 160
10 Compound 115Turbine 250
12 Turbine 330
83
!
!
!
!
!
!
!
!
!
!
!
!
!
!!
!
!
!!
!!
!!
!!
!!
£¤183A
CR 175
CR
279
RM 2243
W SH 29
RO
NA
LD W
RE
AG
AN
BLV
D
S U
S 183
NAMELESS R
D
N L
AK
ELI
NE
BLV
D
HERO WAY
CR 281
US
183
OSAGE DR
S B
AG
DA
D R
D
OLD 2243 WEST
CR 280
W NEW HOPE DR
SH 29
S W
ES
T D
R
CRYSTAL FALLS PKWY
CR 176
N B
ELL
BLV
D
E NEW HOPE DR
RM 1431
E CRYSTAL FALLS PKWY
CR
270
BA
GD
AD
RD
HO
RIZ
ON
PA
RK
BLV
D
HA
LSE
Y D
R
JOURNEY PKWY
W SOUTH ST
LEA
ND
ER
DR
ME
L M
ATH
IS A
VE
W WHITESTONE BLVD
E SAN GABRIEL PKWY
SONNY DR
W SAN GABRIEL PKWY
KAUFFMAN LOOP
CR
269
N B
AG
DA
D R
D
N U
S 1
83
RA
IDE
R W
AY
VISTA RIDGE DR
CR 177
HERITAGE GROVE RD
TRAVISSO PKW
Y
COLLABORATIVE WAY
WATERFALL AVE
SOUTH BROOK DR
SU
NN
Y B
RO
OK
E D
R
MUNICIPAL DR
E SOUTH ST
MCCARTHUR DR
E WOODVIEW DR
HAZELWOOD ST
W METRO DR
N W
ES
T D
R
E SONNY DR
W BROADE ST
WO
OD
VIE
W D
R
MEADOW VIEW DR
METRO DR
RO
NA
LD W
RE
AG
AN
BLV
D
RM 143
1
E NEW HOPE DR
SONNY DR
US
183
SONNY DR
W B
ROAD
E ST
San Gabriel River Park
LEOCTR
STILES MS
WYLIEMS
ROUSEHS
PLAINES
BAGDADES
CAMACHOES
LEANDERHS
WINKLEYES
LEANDERMS
NEW HOPE HS
FUTURE SCHOOL
FUTURE SCHOOL
FUTURE SCHOOL
FUTURE SCHOOL
TOM GLENNHS
WHITESTONEES
PLEASANTHILLES
FUTURE ELEMENTARY SCHOOL
CR
266
NAMELESS RD
CR 175
S U
S 18
3
CR 280
W SH 29
US
183
NB
CR
267
RM 2243
US
183
DRV
W
CR 281
HERO WAY
US
183
SB
CR 176
CR
OS
S C
REE
K R
D
CR 272
CR 279
CR 259
CR
270
CROSS CREEK LN
CR 282
OLD 2243 WEST
CR 290
RIV
ER R
UN
CR 177
JOURNEY PKWY
EAGLES WAY
RID
GM
AR
RD
GLA
SS D
R
WO
OD
LAN
D T
RL
N RIM DR
LAK
EWO
OD
TR
L
LIVE OAK RD
FM 1431 RD
CR 268
OA
K G
RO
VE R
D
SUM
AC
LN
AC
AC
IA D
R
DEWS RD
CR 180
MESA OAKS
MEL
MAT
HIS
AVE
W SAN GABRIEL PKWY
PVR
920
LEAN
DE
R D
R
N U
S 183
BA
GD
AD
RD
WHISPER LN
FALCON OAKS DR
CYPR
ESS LN
CR
269
GLORY LN
HALSEY DR
SILVER CREEK DR
N B
AG
DA
D R
D
PVR
921
LAC
Y D
R
W WHITESTONE BLVD
UNITY DR
RIVA RIDGE DR
SPYGLASS HILL
LAJIT
AS
RID
GE
VIE
W D
R
CR 263
RA
IDE
R W
AY
MO
OR
E LN
CR
276
SOUTH GABRIEL DR
APPLE SPRINGS DR
PVR 949
LOS VISTA DR
LION DR
PALOS VERDES
HERITAGE GROVE RD
DR
EAM
CATC
HER
DR
E SAN GABRIEL PKWY
WOODALL DR
HIDDEN MESA
OSAGE DR
CR 264
COPPER LN
TRAV
ISS
O P
KW
Y
S W
EST
DR
SIOUX TRL
OAK CREEK RD
PVR 918HONEYCOMB DR
RIDGELINE RD
ORCHARD DRCOLLABORATIVE WAY
N B
ELL B
LVD
MUNICIPAL DR
VALLEY VIEW RD
VISTA HEIGHTS DR
LA JAITA DR
PAR
K P
LAC
E D
R
HO
RIZO
N PA
RK
BLVD
BORHO
MA
PLEC
REE
K D
R
INDIAN TRL
MIRA VISTA
N R
IDG
E C
IR
APACHE TRL
SIDEWINDER
RA
N R
D
BA
KER
LN
VISTA ROCK DR
EL CIELO
SONNY DR
FAIR OAKS ST
DO
WN
ING
LN
W WINDEMERE
PVR 911
RO
AR
ING
FOR
K
VP R
AN
CH
DR
SEMINOLE RD
RO
NA
LD W
REA
GA
N B
LVD
GOOD NIGHT TRL
HO
NE
YCO
MB
HO
LW
E NEW HOPE DR
APPLE SPRINGS HOLW
WIGWAM
CREEK RUN DR
MEDICINE HAT
PAR
KW
OO
D D
R
IRE
LAN
D D
R
FOREST TRL
PASA TIEMPO
CA
RO
L AV
E
MES
A D
R
OLM
OS D
R
DEE
RC
REE
K L
N
AIKEN DR
POPLA
R LN
ANTLERS TRL
TWIN CEDARS RD
W S
OUTH ST
TERRY LN
CENTRAL DR
E CRYSTAL FALLS PKWY
BLO
CK
HO
US
E D
R
MEDICAL PKWY
BRADLEY RANCH RD
GENTRY DR
POR
TER
LN
LAK
E SI
DE
DR
RUTHIE RUN
HORSESHOE DR
N FAWN RIDGE DR
HO
NE
YCO
MB
MES
A
CO
LUM
BIN
E AV
E
OAK PLAZA DR
MESA RDG
E WOODVIEW DR
WA
GO
N W
AY
COUGAR COUNTRY DR
MES
A VI
STA
DR
WASHBURN DR
TRAIL
S END R
D
OAKWOOD DR
E WHITESTONE BLVD
N H
OO
T OW
L LN
TEM
PE D
R
CLA
YTO
N D
R
LOST PINES LN
BARLEY RD
WATERFORD LN
OA
K M
EAD
OW
DR
SPEAK
ING
RO
CK
DU
BLI
N D
R
FLANAGAN DR
FOLSO
M C
T
MO
NTA
LCIN
O L
N
HIG
H L
ON
ESO
ME
S B
LOC
K H
OU
SE D
R
S BA
GD
AD
RD
GOLDEN GATE DR
RURAL SPACE RD
MICA LN
KIN
G LN
CR 278
BO
IS D
AR
C L
N
RM 1431
POW
ER LN
CR 274
KILLA
RN
EY D
R
PARKSIDE PKWY
BROADE WAY
FAWN VALLEY DR
SPIVEY RD
MIK
ES W
AY
W N
EW H
OPE DR
VIA DE SIENNA BLVD
IRON HORSE
WH
ITLE
Y D
R
CO
TTO
NW
OO
D C
RE
EK T
RL
PVR 919
MARCOS DR
PEAC
H TR
EE LN
GREEN VALLEY DR
SHADY MOUNTA
IN R
D
TOR
O G
RA
ND
E B
LVD
KAUFFMAN LOOP
OAK HOLLOW DR
MO
CK
ING
BIR
D L
N
WOODWAY DR
FALC
ON
LN
RUNNING DOE LN
BU
RG
ESS
DR
WO
OD
LAN
D D
R
ABBEY LN
RED
OA
K L
N
CH
AD
WIC
K D
R
LAUREN LOOP
SKYV
IEW
TER
BA
RC
LAY
DR
FLORENZ LN
VALK ST
CA
NYO
N V
W
RA
IND
AN
CE
BA
NN
ER A
VE
KATHLEEN LN
SYDNEE DR
KAT
HER
INE
WAY
N L
AK
ELIN
E B
LVD
RO
LLS
RD
ZOA
DR
WARFIELD
CHARDONNAY XING
LON
E OA
K D
R
TOPAZ LN
BEN
T W
OO
D D
R
DO
RIS LN
BROWN BLUFF CIR
S O
LD C
R 1
80
HO
US
EFIN
CH
LO
OP
GR
EEN
LEE
DR
WO
OD
LEY
RD
LONE
WO
LF D
R
JENNIFER LN
S B
RU
SHY
ST
BEVERLY LN
VENEZIA VW
THE OUTER AVE
LAUGHING DO
G CT
AM
AN
DA
S WAY
BEL
LO D
R
BA
RN
AR
D L
N
KIN
GFI
SH
ER L
N
MESA TRL
MESA GRANDE DR
HEN
DER
SON
DR
S R
IDG
E C
IR
ATLANTA PARK DR
DEL PASO
LARSTON LN
SHORT RD
S WA
LKE
R D
R
LON
DO
ND
ERRY D
R
FROSTDALE DR
BU
RB
A LN
TALL CHIEF
SANTA RITA BLVD
MARSHALL CT
AR
RO
W P
OIN
T D
R
FOOTHILLS
RIV
ER O
AK
DR
ARTERIAL H
HONEYCOMB LN
POW WOW
REM
ING
TON
DR
S BAKER CIR
STA
PLEF
OR
D D
R
LIONS LAIR
DU
RA
NG
O H
ILLS
DR
OLD QUARRY RD
N BAKER CIR
HILLTOP DR
ASC
OT
LN
RIMSTONE DR
CINDY LN
BARN
ETT
DR
LIVE OAK
MALLARD LN
JOPP
A RD
HONEYCOMB CT
FIRST VIEW
DOEFIELD DR
FLAT IRON CT
VALLEY VIEW
DR
LIM
ER
ICK
LN
HERNANDOS LOOP
BU
FFLE
HEA
D L
N
ARIELLA DR
BONITA VERDE DR
VALLEY VIEW CIR
HIGH GABRIEL EAST
PERRY MAYFIELD
CORBIN WAY
CLO
VER LN
CEN
TUR
Y LN
MARSALA CIR
ROSADI CV
AUDRA ST
BR
OM
E D
R
MARYSOL TRL
LOS ROBLES RD
MONAHANS DR
ESCALERA PKWY
BARANCO WAY
WOOD CREEK DR
RUBY ISLE DR
SCENIC PATH
MIL
LCR
EEK
LN
BEAR CLAW
GABRIELS LOOP
LITTLE VALLEY RD
MISTY RIDGE
AIRPORT
DR
FOU
ND
ER D
R
DORMAX C
IR
HAWKSBURY WAY
JOH
N T
EE
DR
CRYSTAL FALLS PKWY
CH
RIS
TOPH
ER L
N
E WINDEMERE
ENC
INIT
A D
R
LLOYDMINISTER WAY
VENTANA CANYON
SANTA MARIA ST
SAN
TAN
A S
T
SPOTT
ED E
AGLE D
R
THRUSH DR
GO
LDEN
EA
GLE
LN
LANTANA DR
TIM
ARRO
N
HO
NE
YBEE
LN
WEST VIEW DR
RED
HAW
K D
R
ENCINO DR
GR
EEN
ER D
R
S H
OO
T O
WL
LN
OLD BAGDAD RD
RIV
ERW
AY L
N
PEORIA DR
TREMONT DR
COUNTY CORK LN
ENC
AN
TO D
R
CREEK MEADOW CV
BR
IAR
WO
OD
DR
MA
NA
DA
TRL
LONG BOW DR
OVERLOOK BND
JADESTO
NE DR
CEDAR HILLS BLVD
BRANCH HOLW
TIPP
ER
ARY
DR
AN
GE
L SI
DE
DR
DARNELL DR
POW
ELL
DR
CLAUDIA DR
ANGEL MO
UNTAIN DR
LAS C
OLIN
AS
DR
NORT
H HI
LL C
IR
CHRISTINE DR
NO
RTH
ERN
TR
L
SAN
DB
UR
LN
CLE
AR
CR
EEK
DR
HOUSE CREEK DR
INDIAN CHIEF DR
EAG
LEC
RE
EK D
R
CH
EYEN
NE
ST
CHICKADEE LN
BYF
IELD
DR
HED
DER
CIR
LAU
REL
LN
DOWNRIDGE DR
GLE
N O
AK
LN
BAT
TLEC
REE
K L
N
AMBU
SH C
ANYO
N
CO
LUM
BIN
E LN
APPLE ROCK
DO
VE
RID
GE
TR
L
E OLD CR 180
RIC
E A
VE
BRASHEAR LN
RUSTY SPUR
CLE
AR
SP
RIN
G L
N
PARKER PL
HO
LLY
HIL
L D
R
VIN
TAG
E D
R
ESTA
NC
IA W
AY
RUTHERFORD DR
SNOW GOOSE
WIN
SLO
W D
R
ASHBURY DR
DRAKE CV
NORWOOD DR
ERICANNA LN
BUFF
ALO
GAP
OAKWOOD TRL
MATHIAS ST
CORTONA LN
HIG
H C
HA
PAR
RA
L D
R
GR
EEN
ING
WAY
MULEDEER RUN
LIGHTNING RANCH RD
MERCURY CV
ROCK HILL RD
TER
RA
CE
DR
COTTON PICKIN LN
THOMPSON ST
COACHLAMP DR
CA
MIN
O A
LEME
DA
MANLEY
WAY
RIM
RO
CK
DR
TUR
TLE
RIV
ER D
R
MAGPIE GOOSE LN
MA
RC
HEE
TA W
AY
BOND
ICK
RD
SQU
AW VA
LLEY
SPRING HOLLOW DR
MO
JAVE BN
D
MO
ON
GLO
W D
R
TYRO
NE D
R
CONTINENTAL PASS
HEN
THO
RN
E W
AY
SEND
ERO
LN
CO
PPER
LEA
F LN
BIG FALLS DR
MANSFIELD LN
CADDO LAKE DR
HA
NEM
AN
CV
SILVERSTONE LN
SOC
OR
RO
BN
D
EAG
LE OW
L LOO
P
SWEETWATER LN
HIGHLAND TRL
RIO V
ERDE DR
INCA DOVE LN
STANFORD DR
CAMINO ALTO DR
BAR
RYDE
R TR
L
DEERFIELD PARK DR
MOUNTAIN RIDGE DR
ST HELENA DR
SPRING BROOK LN
SER
ENE
OA
KS
DR
PARKSVILLE WAY
LODESTONE CIR
NORCIA LOOP
MOCKINGBIRD HILL
GLE
N F
IELD
DR
VALLE VER
DE
DR
CA
RLY
AN
N L
N
HIGHLAND DR
WICKLOW DR
WHITEWING DR
TIM
BE
RWO
OD
DR
INDUSTRIAL BLVD
PAM
PAS
RIC
AS
DR
CA
MIN
O R
EAL
DR
SAN
GIO
VESE
ST
RA
NC
HO
VIE
JO L
N
RED RIVER LN
PRESERVE TRL
CO
TTO
NTA
IL D
R
YELLOW IRIS RD
MC
DO
WEL
L B
ND
IND
IAN
LO
DG
E D
R
PEREGRINE WAY
QUICKSILVER DR
APPLE SPRINGS CIR
THUNDER HORSE
COPPER LAKE LN
AMARYLLIS AVE
CALLA LILY BLVD
VISTA RIDGE DR
SPA
RK
LIN
G B
RO
OK
LN
BIG
TH
ICK
ET
DR
BARN OWL LOOP
AVEN
UE
OF
THE
STA
RS
MIDDLE BROOK DR
ELAINA LOOP
CANDLELIGHT DR
DIS
CO
VER
Y B
LVD
CARRIAGE CLUB DR
ST G
ENEV
IEVE
DR
WEDGESCALE PASS
MILLBROOK LOOP
CACTUS MOUND DR
BULL CREEK PKWY
LOM
A C
EDR
O B
ND
BR
AN
DIN
G IR
ON
LN
GRAND LAKE PKWY
HERITAGE PARK DR
NORTH CREEK BLVD
DAV
IS M
OU
NTA
IN L
OO
P
FORT COBB WAY
WASHINGTON SQUARE DR
LOST
MA
PLES
LO
OP
LAFAYETTE SQUARE DR
CR
175
BLOCK HOUSE DR
N L
AK
ELIN
E B
LVD
PALOS VERDES
BAKER LN
S BA
GD
AD
RD
E SAN GABRIEL PKWY
TIMB
ERW
OO
D D
R
CR 270
W N
EW H
OPE DR
CR
175
HIGH LONESOME
N LAKELINE BLVD
CR
279
RM 2243
S BAGDAD RD
CR 180
BARNET
T DR
CR
279
CREEK RUN D
R
MEDICAL PKWY
US
183
HERO WAY
CRYSTAL FALLS PKWY
DOWNRIDG
E DR
RO
NA
LD W
REA
GA
N B
LVD
S W
EST
DR
N L
AK
ELIN
E B
LVDW NEW HOPE DR
N L
AK
ELIN
E B
LVD
SONNY
DR
CR
279
OLD 2243 WEST
MARSALA CIR
N L
AK
ELIN
E B
LVD
CR 175
RED
HAW
K D
R
US 1
83 S
B
E WHITESTONE BLVD
W NEW HOPE DR
CADDO LAKE DR
N LA
KELIN
E B
LVD
CR
180
RO
NA
LD W
REA
GA
N B
LVD
N B
ELL
BLV
D
W S
OU
TH ST
CR
175
RIDGE VIEW DR
BLO
CK
HO
US
E D
R
E CRYSTAL FALLS PKWY
E NEW HOPE DR
OLD 2243 WEST
S BAGDAD RD
CR 177
OSAGE DR
RUTHERFORD DR
CR
270
W SH 29
VP RANCH D
R
NO
RTH
ERN
TR
L
POW
ER LN
OLD QUARRY RD
N LAKELINE BLVD
CLO
VER
LN
CRY
STA
L FA
LLS
PKW
Y
FM 1431 RD
RO
NA
LD W
REA
GA
N B
LVD
BLO
CK
HO
US
E DR
BONITA VERDE DR
ZOA DR
NAMELESS RD
SHADY MOUNTA
IN R
D
OLD 2243 WEST
LAKE SIDE DR
S B
AG
DA
D R
D
S W
EST
DR
GOOD NIGHT TRL
FALCON LN
TRAVISSO PKWY
DRVW
CR
279
EL CIELO
BLOCK HOUSE DR
CRYSTAL FALLS PKWY
CR 175
W NEW HOPE DR
S BA
GD
AD
RD
HIG
H L
ON
ESO
ME
E CRYSTAL FALLS PKWY
E NEW HOPE DR
RONALD W REAGAN BLVD
E CRYSTAL FALLS PKWY
OSAGE DR
RO
NA
LD W
REA
GA
N B
LVD
NAMELESS RD
US
183
E NEW HOPE DR
CR
175
N B
ELL
BLV
D
BLOCK HOUSE DR
PEA
CH
TR
EE
LN
CR 263
CHRISTOPHER LN
KAUF
FMAN
LO
OP
E CRYSTAL FALLS PKWY
CR
175
US
183
SB
BO
IS D
AR
C L
N
US
183
NB
CR
175
OSAGE DR
RM 2243
OLD 2243 WEST
FM 1431 R
D
HO
RIZ
ON
PA
RK
BLV
D
CR 281
US 183
KA
UFF
MA
N L
OO
P
MUNICIPAL DR
RO
NA
LD W
REA
GA
N B
LVD
PERRY MAYFIELD
CR
175
CR
175
N RIM DR
N B
ELL B
LVD
POPL
AR
LN
N L
AK
ELIN
E B
LVD
GAREY PARK
SOUTHWEST REGIONAL PARK AND PRESERVE
Lakewood
Crystal Falls Golf Course
Benbrook Ranch
Devine Lake
Sarita Valley
Robin Bledsoe
Veterans Park
Mason Homestead
Mason Creek
Lake TravisLake Travis
Brushy Creek
Brushy Creek
Bing
ham
Cre
ek
Bing
ham
Cre
ek
BB ll oo cc kk HH oo uu ss eeCC
rr eeee kk
Mason CreekMason Creek
Jinks Branch
Jinks Branch
SS oo uu tthh FFoorr kk SS aann GGaabbrr ii ee ll RR ii vveerr
BB ii ggSS aa nn dd yy
CCrr ee
ee kk
JJee nn kk ii nnss BB rr aa nn cc hh
SSoo uu tt hh FF oo rr kk BB rr uu ss hh yy CC rr eeee kk
NN oorr tt hh FF oo rr kk BB rr uu ss hh yy CC rr ee ee kk
PPo osstt OOaakk CCrreeeekk
CCoo ttttoonnwwoooodd CCrreeee kk
SS pp aa nn ii sshh OOaa kk CC rree ee kk
MMiiddddl lee
FFoorrkkSSaann
GGaabbrriieell RRiivveerr
JJ ii nnkkss BBrraanncchh
MM aa ss oo nn CCrreeeekk
BBrr uu
ss hhyy
CCrr ee
ee kk
SSoouu tt
hhFF
oo rrkk
SS aa nn GG aa bb rr ii eell RR ii vv ee rr
BB rr uu ss hh yy CCrr ee
eekk
BB iigg SS aa nn dd yy
CCrr ee
ee kk
BBii gg
SS aa nn dd yyCC
rr eeee kk
BBii gg
SS aa nn dd yy CC rr ee ee kk
Jinks Branch
Jinks Branch
Brushy Creek
Brushy Creek
BB ll oocc kk HH oo uuss ee CCrreeeekk
Spanish Oak CreekSpanish Oak Creek
Brushy CreekBrushy Creek
BBrruusshhy yC C
r re ee ek k
BBiigg SSaa nn dd yy CC rr ee ee kk
Brushy Creek
Brushy Creek
SSoouutthh FFoorrkk SSaann GGaabbrriieell RRiivveerr
BBii gg
SSaa nn
dd yyCC rr ee
ee kk
Big Sandy Creek
Big Sandy Creek
BBii gg
SS aa nn dd yyCC
rr eeee kk
Big
Sand
y C
reek
Big
Sand
y C
reek
BB rr uuss hhyy CC rree ee kk
BB ll oocckk HHoouussee CCrreeeekk
MM aa ss oo nn
CCrr ee
ee kk
SSoo uu tt hh FF oo rr kk SS aa nn GG aa bb rr ii ee ll RR ii vv ee rr
SS pp aa nn ii ss hh OO aa kk CCrr eeeekk
£¤183
£¤183
£¤183
£¤183
UV29
UV29
CITY OF LEANDER, TEXAS
Future Land Use MapEffective October 15, 2015
E0 1,250 2,500 3,750 5,000625
Feet
FUTURE LAND USE
Open Space
Mixed Use Corridor
Commercial Corridor
Neighborhood Center
Community Center
Activity Center
Transit Supportive Mixed Use
Station Area Mixed Use
Old Town Mixed Use
Employment Mixed Use
Industrial District
Neighborhood Residential
Texas Local Government Code Section 213.005: A comprehensive plan shall not constitute zoning regulations or establish zoning districtboundaries.
This map has been produced by the City of Leander for informational purposes only. No warranty is made by the City regarding completeness or accuracy, This data should not be construed as a legal description or survey instrument. No responsibility is assumed for damages or other liabilities due to the accuracy, availability, completeness, use or misuse of the information herein provided.
* Properties added to the ETJ after the adoption of this Future Land Use Map are designated as Neighborhood Residential.
84
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Population and LUE Projections The population projections were developed by RS&H as part of the Comprehensive Plan. The LUEs were calculated from the population projections. The difference between the number of LUEs for the water system and wastewater system is due to the difference in service area for the water and wastewater systems. All three types of projections are shown in Table 2.
Table 2: Population and LUE Projections 2015 2017 2020 2025 2027 2035
Population 41,652 46,647 54,139 77,724 84,496 111,582 Water LUEs 12,925 15,759 20,010 28,728 32,342 46,796 Wastewater LUEs 12,901 15,773 20,080 27,395 30,648 43,659
Design Criteria In order to properly model, size, and plan for future facilities, design criteria were established for both water and wastewater. The criteria used for water is shown in Table 3.
Table 3: Water Planning and Design Criteria
Criteria Value
People per connection 3.1 Average Day Demand 263.50 gpd/LUE Maximum Day Demand 702.67 gpd/LUE Peak Hour Demand 1,194.53 gpd/LUE Total Storage 200 gpm/LUE Pump Capacity 0.6 gpm/LUE Maximum Peak Hour Velocity 5 fps
The criteria used for wastewater is shown Table 4.
Table 4: Wastewater Planning and Design Criteria Criteria Value People per connection 3.1 Average Dry Weather Flow (ADWF) 63 gal/person/day Peak Wastewater Flow 252 gallons /person/day Gravity Pipe Minimum Velocity 2 fps Gravity Pipe Maximum Velocity 10 fps Force Main Minimum Velocity 3 fps Force Main Maximum Velocity 6 fps
The criteria shown above were used to calculate the capacity of each planned project for each system.
Existing Water and Wastewater System The Leander water system comprises two water treatment plants, two pump stations, numerous pressure reducing valve (PRV) stations, numerous individual service PRVs, two ground storage tanks, two elevated storage tanks, and 171 miles of piping. The Leander wastewater system consists of two wastewater treatment plants, eleven lift stations, and five main interceptors, 154 miles of gravity mains, and 10 miles of force mains.
Information in Table 5 and Table 6 was provided by the City. Improvements paid for by the City of Leander that have capacity for development during the study period have been included in these tables. The cost for each project attributed to development during the study period is shown in the final column. The total cost attributed to development between 2017 and 2027 is $64,196,968 for water and $18,413,469 for wastewater.
85
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Table 5: Previous Water Improvements
Infrastructure Element Size
Final Construction
Cost LUE
Capacity
LUEs Developed
Prior to 2017
LUEs Attributed to 2017-
2027
LUEs Developed
Beyond 2027
Cost Attributed to
2017-2027 Development
Sandy Creek WTP-increase to 12 MGD 6 MGD $8,166,000 8,539 6,864 1,675 0 $1,601,859Raw Water Intake and Transmission Main 12 MGD $4,693,394 17,078 15,403 1,675 0 $460,333 Water Supply – 30” Main 12 MGD $5,699,913 17,078 15,403 1,675 0 $559,053 BCRUA Plant Share to Leander Phase 1A 8 MGD $37,383,800 11,385 356 11,029 0 $36,214,376BCRUA Raw Water Transmission Share to Leander 50.2 MGD $25,530,400 71,442 356 14,908 56,178 $5,327,515 BCRUA Intake Share to Leander – Floating 8 MGD $4,559,000 11,385 356 11,029 0 $4,416,387BCRUA Transmission Share to Leander 50.2 MGD $23,706,800 71,442 356 14,908 56,178 $4,946,978 Crystal Falls High Service Pump Station & EST 12.92 MGD $3,317,932 14,954 8,828 6,126 0 $1,359,173Bagdad High Service Pump Station 2.67 MGD $856,448 8,199 3,090 5,109 0 $533,674CR 280 Elevated Storage Tank – 1252 Zone 1.25 MG $2,431,753 12,500 7,073 1,126 4,301 $219,052Distribution Main along Lakeline Blvd 16 inches $276,850 3,778 1,723 650 1,405 $47,618Crystal Falls Parkway Mains 24 inches $2,039,066 8,500 1,360 578 6,562 $138,656Reagan 30” Water Main to Sarita Valley 30 inches $500,000 13,282 53 5,180 8,049 $195,0002243 & CR 269 Distribution Mains 12 inches $90,866.89 2,125 85 582 1,458 $24,898 East 272 and Reagan Blvd Water Main 12 inches $866,316 2,125 9 540 1,577 $220,044 Northwest 16” Water Mains 16 inches $1,360,397 3,778 1,118 15 2,645 $5,442Leander Drive Water Mains 8 inches $351,452.50 944 151 42 752 $15,46442” Reagan Main South 42 inches $2,375,121 26,032 2,395 16,296 7,341 $1,486,826 Leander-Northwest Water Transmission Line 24 inches $303,115 8,500 1,037 1,411 6,052 $50,31712 & 16” Waterline 16 inches $1,567,065.05 3,778 151 8 3,619 $3,1342243 @ 183A 24” Encasement for 12” Waterline 12 inches $151,626 2,125 21 111 1,993 $7,885 12” Waterline on Old 2243 12 inches $303,324 2,125 0 106 2,019 $15,166 Hero Way Waterline 12 inches $845,791.30 2,125 0 119 2,006 $47,364Palmera Offsite Water 12 inches $16,927.87 2,125 0 714 1,411 $5,688Hero Way Gas Station 24” & 12” 12 inches $73,719.40 2,125 13 646 1,466 $22,411Parkway Crossing Office Seg. A 12 inches $8,773.25 2,125 0 64 2,061 $263Parkway Crossing Office Seg. B 12 inches $8,565 2,125 0 64 2,061 $257 Oak Creek – W. Broade Street Waterline 12 inches $202,530 2,125 0 429 1,696 $40,911Oak Creek – South Brook Waterline 12 inches $232,634 2,125 0 633 1,492 $69,325Travisso CIP 24 24 inches $2,998,927.78 8,500 0 8,500 0 $2,998,928Travisso CIP 26 16 inches $274,359.87 3,778 0 3,778 0 $274,360 Travisso CIP 27 16 inches $716,000 3,778 0 3,778 0 $716,000 Bryson San Gabriel Offsite Water Lines 24 inches $2,730,000 8,500 799 6,273 1,428 $2,014,740 CR280 (Greatwood) 24 inches $303,115 8,500 0 255 8,245 9,093 Liberty Hill WTM (Bagdad Rd WTM Ph. 1) 16 inches $502,623 3,778 0 1,118 2,660 $148,776
Total $64,196,968
86
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Table 6: Previous Wastewater Improvements
Infrastructure Element
Final Construction
Cost Size/
Capacity Current
Flow 2017-2027
Growth Post 2027
Growth
Cost Attributed to 2017-2027 Development
Leander WWTP $13,071,825 2.25 MGD 1.64 0.61 0.00 $3,543,917 Travisso WWTP $1,477,300 0.25 MGD 0.03 0.22 0.00 $1,300,024 Brushy Creek Regional WWTP $12,000,000 1.5 MGD 1.06 0.44 0.00 $3,520,000Brushy Creek Regional System Interceptor $10,800,000 5.5 MGD 1.06 0.57 3.87 $1,119,273 Cedar Park – Brushy Creek Interceptor Reimbursement $9,200,000 5.5 MGD 1.06 0.57 3.87 $953,455 N. Brushy Creek Interceptor Seg. 2/3 $1,297,792 1,608 gpm 274 450 884 $363,188 Block House Creek Interceptor Seg. 1, 2, 3 $3,474,897.60 17,606 gpm 2,543 1,011 14,052 $199,541Block House Creek Interceptor Seg. 4, 5 $790,718.40 3,515 gpm 2,094 898 523 $202,010Block House Creek Interceptor Seg. 6 $376,710 8,950 gpm 1,645 785 6,520 $33,041Block House Creek Interceptor Seg. 7 $1,506,200 5,699 gpm 1,420 729 3,550 $192,669Block House Creek Interceptor Seg. 12 $1,270,000 2,925 gpm 971 616 1,338 $267,460Brushy Creek Interceptor Seg. 1 $1,696,764.96 18,122 gpm 986 1,056 16,080 $98,873Brushy Creek Interceptor Seg. 2 $1,131,176.64 10,840 gpm 825 885 9,130 $92,352Palmera Ridge Offsite Wastewater $1,203,306.62 1,549 gpm 383 414 752 $321,607Stewart Crossing Offsite Wastewater $29,824.17 1,349 gpm 107 114 1,128 $2,520Marbella Offsite Wastewater $113,589.53 1,349 gpm 94 100 1,155 $8,420N Brushy WW Interceptor $2,356,617.66 7,806 gpm 799 856 6,151 $258,425Wedemeyer Wastewater Improvements $3,140,781.04 3,600 LUEs 0 3,600 0 $3,140,781Liberty Hill Connecting Facilities $501,500 3,600 LUEs 0 3,600 0 $501,500Madison Realty $59,733.75 1,825 gpm 0 1,825 0 $59,734Parkway Crossing Offsite Seg. A $6,667.50 7,225 gpm 0 7,225 0 $6,668Parkway Crossing Offsite Seg. B $11,544.75 3,333 gpm 0 3,333 0 $11,545Travisso CIP 5 – Crystal Falls LS $789,427.62 700 gpm 70 630 0 $710,485Travisso CIP 6 – Crystal Falls FM $137,497.68 700 gpm 70 630 0 $123,748Travisso CIP 8 – 15-inch GM $354,596.18 5,430 gpm 543 4,887 0 $319,137Travisso CIP 9 – 12-inch GM $195,778.53 972 gpm 0 972 0 $195,779Crescent North Interceptor $378,120 2,049 gpm 0 2,049 0 $378,120Crescent South Interceptor $489,200 383 gpm 0 383 0 $489,200
Total $18,413,469
87
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Proposed Improvements The proposed improvements to the water and wastewater systems are summarized in Table 7 and Table 8, respectively. The improvements for each system are shown graphically in Exhibit 3 and Exhibit 4. Inflation of the construction costs, based on the estimated year of construction, has been incorporated at a rate of three percent (3%) per year. The capacity of each proposed improvement used before, during, and after the study period has been determined and the adjusted construction cost calculated. The adjusted cost for each project during the study period has been included in the maximum allowable impact fee. The total cost for new water system improvements attributed to development between 2017 and 2027 is $43,694,977, while the costs for wastewater is $29,807,121.
Credit Calculation In order to account for the fact that customers rate payments include amounts used to retire debt, the impact fee calculation must include a determination of the remaining debt service payback for existing users. Table 9 and Table 10 show the credit calculation for the water system and wastewater system, respectively. A bonding cost of 1.5% was added to the capital costs for future projects to account for cost associated with the bond attorney and publishing. The total debt principal remaining per current LUEs for the water system is $2,198.59 and for the wastewater system is $423.45. These are the credits for each system that must be included in the impact fee calculation to represent the rate payments of future customers that will service the debt of the utilities.
88
Leander Impact Fee AnalysisTable 7Water System Improvements
Project Number Description
Estimated Construction Cost
(2017 Dollars)
Expected Const. Date
Construction Cost Adjusted for Year
(I = 3%) LUE
Capacity
Capacity Used Prior
to 2017
Cost Attributed to Development Prior to 2017
Capacity for 2017-2027
Development
Adjusted Cost Attributed to 2017-2027 Development
Excess Capacity for Development
Beyond 2027
Adjusted Cost for Development Beyond 2027
1 Rancho Sienna 147,376.00$ 2018 151,797.28$ 18 inches 4,781 0 -$ 1,014 32,181$ 3,768 119,616$ 2 Kauffman Loop Elevated Storage Tank 3,197,851.00$ 2018 3,293,786.53$ 1.25 MG 12,500 0 -$ 7,881 2,076,667$ 4,619 1,217,120$ 3 Metro Drive Water Line 374,976.00$ 2018 386,225.28$ 12 inches 2,125 0 -$ 106 19,311$ 2,019 366,914$ 4 S. West Drive 8" Water Main 503,799.00$ 2017 503,799.00$ 8 inches 944 78 41,607$ 13 6,934$ 853 455,258$ 5 Reagan 42-inch Water Transmission Line (Blockhouse to CFP) 4,849,061.00$ 2018 4,994,532.83$ 42 inches 26,032 0 -$ 15,203 2,916,807$ 10,829 2,077,726$ 6 Ronanld Reagan Blvd Phase 2 (36 inch) 4,794,099.00$ 2020 5,238,641.42$ 36 inches 19,126 0 -$ 9,027 2,472,639$ 10,098 2,766,003$ 7 San Gabriel East Booster Station 10,364,951.00$ 2018 10,675,899.53$ 12.96 MGD 15,000 0 -$ 15,000 10,675,900$ 0 -$ 8 San Gabriel Pkwy Main Phase 1 CR270/Reagan 6,697,972.00$ 2019 7,105,878.49$ 24 inches 8,500 0 -$ 3,995 3,339,763$ 4,505 3,766,116$ 9 San Gabriel Parkway Mains Phase 2 Pleasant Hill / CR 270 5,306,555.00$ 2019 5,629,724.20$ 24 inches 8,500 0 -$ 3,927 2,600,933$ 4,573 3,028,792$ 10 San Gabriel Pkwy Main Phase 3 (16-inch) 538,470.00$ 2020 588,400.71$ 16 inches 3,778 0 -$ 2,259 351,864$ 1,519 236,537$ 11 Crystal Falls Ground Storage Tank #2 1,887,326.00$ 2019 2,002,264.15$ 1 MG 10,000 0 -$ 8,292 1,660,277$ 1,708 341,987$ 12 CR269 / Hero Way Water Line Improvements Project (Phase 1 & 2) 1,861,877.00$ 2018 1,917,733.31$ 12 inches 2,125 0 -$ 149 134,241$ 1,976 1,783,492$ 13 RM 2243 - Phase 1 2,710,109.00$ 2019 2,875,154.64$ 12 inches 2,125 0 -$ 463 626,784$ 1,662 2,248,371$ 14 RM 2243 - Phase 2 1,956,831.00$ 2020 2,138,282.07$ 12 inches 2,125 0 -$ 68 68,425$ 2,057 2,069,857$ 15 Broade Street 1,341,144.00$ 2019 1,422,819.67$ 12 inches 2,125 0 -$ 128 85,369$ 1,998 1,337,450$ 16 Old 2243 West 411,264.00$ 2020 449,399.28$ 12 inches 2,125 0 -$ 123 26,065$ 2,002 423,334$ 17 Lakeline Boulevard Mains – Phase 1 4,097,369.00$ 2019 4,346,898.77$ 8 inches 944 0 -$ 213 982,399$ 731 3,364,500$ 18 Grand Mesa Subdivision 517,823.00$ 2020 565,839.17$ 8 inches 944 0 -$ 162 97,324$ 782 468,515$ 19 Waterfall Avenue 78,322.00$ 2019 83,091.81$ 12 inches 2,125 526 20,567$ 373 14,585$ 1,226 47,940$ 20 BCRUA Water Treatment Plant Phase 1C 8,135,000.00$ 2019 8,630,421.50$ 4.2 MGD 5,977 0 -$ 1,317 1,901,603$ 4,660 6,728,818$ 21 Whole Sale Main to Georgetown 2,215,271.00$ 2020 2,420,686.43$ 24 inches 8,500 0 -$ 5,678 1,617,019$ 2,822 803,668$ 22 CR 270 1,158,797.00$ 2020 1,266,248.77$ 12 inches 2,125 0 -$ 9 5,065$ 2,117 1,261,184$ 23 US 183A – Phase 1 1,088,640.00$ 2020 1,189,586.32$ 12 inches 2,125 0 -$ 357 199,851$ 1,768 989,736$ 24 Hero Way 1,476,620.00$ 2021 1,661,948.82$ 12 inches 2,125 0 -$ 4 3,324$ 2,121 1,658,625$ 25 Woodview Drive 748,064.00$ 2020 817,429.73$ 8 inches 944 0 -$ 53 45,776$ 892 771,654$ 26 BCRUA Water Treatment Plant Phase 1D 2,332,867.00$ 2020 2,549,186.76$ 6.1 MGD 8,681 0 -$ 0 -$ 8,681 2,549,187$ 27 San Gabriel West Booster Station and Mains 3,504,816.00$ 2020 3,829,807.07$ 5.04 MGD 5,833 0 -$ 3,403 2,234,200$ 2,430 1,595,607$ 28 Deer Brook Subdivision – Phase II 1,549,235.00$ 2025 1,962,524.55$ 8 inches 944 0 -$ 164 341,479$ 780 1,621,045$ 29 San Gabriel Elevated Storage Tank 4,508,711.00$ 2021 5,074,593.95$ 1.5 MG 15,000 0 -$ 8,837 2,989,612$ 6,163 2,084,982$ 30 Lively Tract 16" Water Main 2,730,000.00$ 2022 3,164,818.22$ 16 inches 3,778 0 -$ 491 411,426$ 3,287 2,753,392$ 31 Ronald Reagan Blvd Phase 3 4,216,440.00$ 2025 5,341,260.04$ 30 inches 13,282 0 -$ 6,986 2,809,503$ 6,296 2,531,757$ 32 W San Gabriel Parkway Mains – Phase 1 961,558.00$ 2025 1,218,072.91$ 12 inches 2,125 0 -$ 128 73,084$ 1,998 1,144,989$ 33 Crystal Falls Parkway Mains 1,469,870.00$ 2025 1,861,987.34$ 18 inches 4,781 0 -$ 3,615 1,407,662$ 1,167 454,325$ 34 TOD Build-Out 5,237,115.00$ 2026 6,833,247.21$ 8 inches 944 0 -$ 74 532,993$ 871 6,300,254$ 35 183A - Phase 2 817,690.00$ 2027 1,098,906.98$ 12 inches 2,125 0 -$ 323 167,034$ 1,802 931,873$ 36 Dream Catcher Mains 771,120.00$ 2027 1,036,320.80$ 12 inches 2,125 0 -$ 1,573 766,877$ 553 269,443$
Cost Totals 94,558,989$ 104,327,216$ 62,174$ 43,694,977$ 60,570,065$
Assumptions: 0.03 Inflation RateMaximum Waterline Velocity = 5 fps
Maximum Day Demand = 702.67 gpd/LUEPeak Hour Demand = 1194.53 gpd/LUE
Required Storage = 200 gallons/LUEPump Capacity = 864 gpd/LUEPRV Capacity =Capacity of Main
Size
LEANDER WATER AND WASTEWATER IMPACT FEEJULY 2017 89
Leander Impact Fee AnalysisTable 8Proposed Wastewater Improvements
Project Number Description
Estimated Construction Cost
(2017 Dollars)
Expected Construction
Date
Construction Cost Adjusted
for Year (I = 3%)
Current Flow
Cost Attributed to Development Prior to 2017
2017-2027 Growth
Adjusted Cost Attributed to
2017-2027 Development
Post 2027 Growth
Cost for Development Beyond 2027
1 Travisso Water Reclamation Plant Expansion - Interim Phase II $ 3,307,500.00 2017 3,307,500$ 0.35 MGD 0.02 189,000$ 0.33 3,118,500$ 0.00 -$ 2 Bryson/Crescent - TODD Lift Station No. 1 $ 480,000.00 2017 480,000$ 930 gpm 0 -$ 724 373,677$ 206 106,323$ 3 Liberty Hill WW Treatment $ 5,580,000.00 2018 5,747,400$ 3,600 LUEs 0 -$ 3,600 5,747,400$ 0 -$ 4 Leander TOD Interceptor $ 2,753,732.00 2018 2,836,344$ 608 gpm 0 -$ 178 830,377$ 430 2,005,967$ 5 Bryson/Crescent - TODD Lift Station No. 2 $ 612,000.00 2019 649,271$ 600 gpm 0 -$ 150 162,318$ 450 486,953$ 6 North Fork Brushy Creek Interceptor Segment 19 Phase 1 $ 100,000.00 2019 106,090$ 291 gpm 0 -$ 89 32,447$ 202 73,643$ 7 Falcon Oaks Wastewater Collection System $ 3,052,728.00 2020 3,335,798$ 326 gpm 0 -$ 254 2,599,058$ 72 736,741$ 8 Cannon Miehaus Gravity Mains $ 1,187,451.00 2020 1,297,560$ 326 gpm 0 -$ 165 656,740$ 161 640,819$ 9 Lift Station 2 Improvements $ 1,509,732.00 2021 1,699,217$ 764 gpm 0 -$ 39 86,740$ 725 1,612,477$ 10 Leander WWTP Expansion $ 21,262,500.00 2023 25,388,537$ 2.25 MGD 0.00 -$ 0.52 5,867,573$ 1.73 19,520,964$ 11 Travisso WWTP Expansion - Final Phase $ 1,587,600.00 2024 1,952,548$ 0.168 MGD 0.00 -$ 0.17 1,952,548$ 0.00 -$ 12 North Brushy Creek Interceptor Improvements Seg 13 $ 2,693,591.00 2025 3,412,160$ 3,597 gpm 0 -$ 1,546 1,466,555$ 2,051 1,945,605$ 13 Lakeline Blvd Gravity Mains - Phase I $ 3,621,476.00 2025 4,587,577$ 2,666 gpm 0 -$ 1,190 2,047,718$ 1,476 2,539,859$ 14 Lakeline Blvd Gravity Mains - Phase 2 $ 1,531,052.00 2025 1,939,491$ 744 gpm 0 -$ 267 696,027$ 477 1,243,464$ 15 Lift Station 27 $ 1,437,687.00 2025 1,821,219$ 783 gpm 0 -$ 750 1,744,463$ 33 76,756$ 16 Brushy Creek Regional WWTP $ 34,000,000.00 2025 43,070,183$ 4 MGD 0.00 -$ 0.13 1,399,781$ 3.87 41,670,402$ 17 Mason Creek Interceptor Improvements $ 1,292,760.00 2026 1,686,759$ 716 gpm 0 -$ 92 216,734$ 624 1,470,024$ 18 North Brushy Creek Interceptor Improvements - Phase II $ 4,863,909.00 2026 6,346,298$ 4,286 gpm 0 -$ 546 808,464$ 3,740 5,537,834$
Cost Totals 90,873,718$ 109,663,951$ 189,000$ 29,807,121$ 79,667,830$
Assumptions: 3% Inflation Rate3.1 Persons/LUE63 Gallon/Day/Person (avg)
252 Gallon/Day/Person (peak)0.90 DFCR
Size
LEANDER WATER AND WASTEWATER IMPACT FEEJULY 2017 90
"
i7
UTUT"
i7
"
i7
"
i7
"¬!"¬!"¬!
"¬!
"¬!"¬!
"¬!"¬!
"¬!"¬!"¬!"¬!
"¬!"¬!
T-280
T-SANGABRIEL
US H
WY 183
US HWY 183A
RO
NALD
REAG
AN BLVD
BAGDAD RD
SAN GABRIEL PKWY
CRYSTAL FALLS PKWY
SANDY CREEK WTPBCRUA WTP
SAN GABRIELEAST PS
"
i7
BCRUA WTP EST
0 3,600 7,2001,800Feet
q
CITY OF LEANDER2017 IMPACT FEE UPDATE
WATER SYSTEMIMPROVEMENTS
EXHIBIT 3
UT
UT
"
i7
"¬! "¬! "¬!
"¬! "¬!
T-CF-EST
T-CFGST 01
T-CFGST 02
0 170 34085Feet
CRYSTAL FALLS
LEGENDUT Ground Storage Tank
"
i7
Elevated Storage Tank
2035_PumpsPROJECT"¬! Existing Pump
"¬! Proposed Pumps
PipesZONE, PROJECT
1127 Zone - Existing
1127 Zone - Proposed
1200 Zone - Existing
1200 Zone - Proposed
1252 Zone - Existing
1252 Zone - Proposed
1255 Zone - Existing
1255 Zone - Proposed
1272 Zone - Existing
1272 Zone - Proposed
Current CCN
Leander ETJ
1127 Zone
1200 Zone
1252 Zone
1255 Zone
1272 Zone
Parcels
¬«1
¬«11
SAN GABRIELWEST PS
¬«2
¬«3
¬«4
¬«5
¬«6
¬«7
¬«8
¬«9
¬«10
¬«12
¬«13
¬«14
¬«15
¬«16
¬«17
¬«18
¬«19
¬«20
¬«21
¬«30
¬«22
¬«23
¬«24
¬«25
¬«26
¬«27
¬«28
¬«29
¬«31
¬«32
¬«33
¬«34
¬«35
¬«36
91
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
#*
3Q
3Q
LS 07
LS 13
LS 14
BrysonTODD LS 1 Wedemeyer LS
LS 15
LS 01
LS 06
LS 02
LS 16
LS 08
LS 18
Deerbrook LS
BrysonTODD LS 2
LS 27
¬«17
US H
WY 183 US HWY 183A
RO
NALD
REAG
AN BLVD
BAGDAD RD
SAN GABRIEL PKWY
CRYSTAL FALLS PKWY
¬«7
¬«8¬«18
¬«1
¬«9
¬«13
¬«10
LEANDER WWTP
DISCHARGE INTO BRUSHY CREEKREGIONAL WASTEWATER SYSTEM
TRAVISSO WWTP
0 3,600 7,2001,800Feet
q
CITY OF LEANDER2017 IMPACT FEE UPDATE
WASTEWATER SYSTEMIMPROVEMENTS
EXHIBIT 4
LEGEND3Q WWTP
#* Future Lift Station
#* Existing Lift Station
Proposed Gravity Mains
Existing Gravity Mains
Future Force Main
Existing Force Main
Existing Low Pressure System
WW Basins
Served by Liberty Hill
Septic Systems
Current CCN
Leander ETJ
Parcels
Rivers/Creeks/Streams
¬«11
¬«15¬«2
¬«12
¬«14
¬«3
LIBERTY HILLWASTEWATER TREATMENT
¬«16
¬«2
¬«6
¬«5
¬«4
92
Table 9Credit Calculation for Water System
DescriptionRemaining Principal
Current Utilitization
Total Debt Principal per Current LUE
ExistingAcquire Leander Water Supply Corp. 199,295.90$ 100% 12.65$ Purchase Sandy Creek WTP from LCRA 31,200,000.00$ 90% 1,785.64$ CIP Management (10M Contingency) 429,920.65$ 100% 27.28$ Cedar Ridge Apartments 1,312.33$ 100% 0.08$ Consultants-Easements, Right-of-ways 17,789.62$ 100% 1.13$ Master Water Plan & Model 411,854.52$ 100% 26.13$ Ridgmar Waterline 855,000.00$ 20% 10.85$ Cedar Park Raw Water Contingency 1,654,314.25$ 100% 104.98$ 1M Gal Northcreek Elevated Storage Tank 294,498.01$ 100% 18.69$ 12" & 8" Water Lines on Sonny Drive 118,820.04$ 12% 0.92$ 12" & 16" Water Lines on Crystal Falls to Southwest 277,519.36$ 8% 1.48$ 12" Water Line Hwy 183 at CR 272 and FM 2243 165,273.70$ 4% 0.42$ 12" Water Line at Lacey Dr & Crystal Falls & Sonny 302,187.77$ 3% 0.65$ 16" Water Line at Hwy 183 at Crystal Falls & 2243 492,873.65$ 4% 1.25$ 16" Water Line on CR 272 1,337,318.48$ 10% 8.83$ 8" Water Line on Leander & CR 272 & Hazelwood 302,861.81$ 9% 1.69$ NW Booster Pump Station 556,460.18$ 38% 13.31$ NW Elevated Storage Tank 1,287,922.40$ 57% 46.24$ NW Waterline Improvements 897,572.50$ 28% 15.72$ Sandy Creek Water Treatment Plant-increase to 12 MGD -$ 80% -$ Raw Water Intake and Transmission Main -$ 90% -$ Water Supply - 30" Main -$ 90% -$ BCRUA Plant Share to Leander Phase 1A 35,395,300.00$ 3% 70.23$ BCRUA Raw Water Transmission Share to Leander 24,172,400.00$ 0.5% 7.64$ BCRUA Intake Share to Leander - Floating 4,316,500.00$ 3% 8.56$ BCRUA Transmission Share to Leander 22,445,800.00$ 0.5% 7.10$ Crystal Falls High Service Pump Station & Elevated Storage Tank 617,000.00$ 59% 23.11$ Bagdad High Service Pump Station -$ 38% -$ CR 280 Elevated Storage Tank - 1252 Zone -$ 57% -$ Distribution Main along Lakeline Blvd -$ 46% -$ Crystal Falls Parkway Mains -$ 16% -$ Reagan 30" Water Main to Sarita Valley -$ 0% -$ 2243 & CR 269 Distribution Mains -$ 4% -$ East 272 and Reagan Blvd Water Main -$ 0% -$ Northwest 16" Water Mains -$ 30% -$ Leander Drive Water Mains -$ 16% -$ 42" Reagan Main South -$ 9% -$ Leander - Northwest Water Transmission Line -$ 12% -$ 12 & 16" Waterline, Paving and Drainge Capital Improvements -$ 4% -$ 2243 @ 183A 24in Encasement for 12in WL -$ 1% -$ 12-inch WL on Old 2243 -$ 0% -$ Hero Way Waterline -$ 0% -$ Palmera Offsite Water -$ 0% -$ Hero Way Gas Station 24" & 12" -$ 1% -$ Parkway Crossing Offsite Seg. A -$ 0% -$ Parkway Crossing Offsite Seg. B -$ 0% -$ Oak Creek - W. Broade Street Waterline -$ 0% -$ Oak Creek - South Brook Waterline -$ 0% -$ Travisso CIP 24 -$ 0% -$ Travisso CIP 26 -$ 0% -$ Travisso CIP 27 -$ 0% -$ Crescent Offsite Water -$ 0% -$ Liberty Hill Water Transmission Main (Bagdad Rd WTM Ph.1) -$ 0% -$
FutureRancho Sienna 154,074.24$ 0% -$ Kauffman Loop Elevated Storage Tank 3,343,193.33$ 0% -$ Metro Drive Water Line 392,018.66$ 0% -$ S. West Drive 8" Water Main 511,355.99$ 8% 2.68$ Reagan 42-inch Water Transmission Line (Blockhouse to CFP) 5,069,450.82$ 0% -$ Ronanld Reagan Blvd Phase 2 (36 inch) 5,317,221.04$ 0% -$ San Gabriel East Booster Station 10,836,038.02$ 0% -$ San Gabriel Pkwy Main Phase 1 CR270/Reagan 7,212,466.67$ 0% -$ San Gabriel Parkway Mains Phase 2 Pleasant Hill / CR 270 5,714,170.06$ 0% -$ San Gabriel Pkwy Main Phase 3 (16-inch) 597,226.72$ 0% -$ Crystal Falls Ground Storage Tank #2 2,032,298.12$ 0% -$ CR269 / Hero Way Water Line Improvements Project (Phase 1 & 2) 1,946,499.31$ 0% -$ RM 2243 - Phase 1 2,918,281.96$ 0% -$ RM 2243 - Phase 2 2,170,356.30$ 0% -$ Broade Street 1,444,161.96$ 0% -$ Old 2243 West 456,140.27$ 0% -$ Lakeline Boulevard Mains – Phase 1 4,412,102.25$ 0% -$ Grand Mesa Subdivision 574,326.76$ 0% -$ Waterfall Avenue 84,338.19$ 25% 1.32$ BCRUA Water Treatment Plant Phase 1C 8,759,877.82$ 0% -$ Whole Sale Main to Georgetown 2,456,996.73$ 0% -$ CR 270 1,285,242.50$ 0% -$ US 183A – Phase 1 1,207,430.12$ 0% -$ Hero Way 1,686,878.05$ 0% -$ Woodview Drive 829,691.18$ 0% -$ BCRUA Water Treatment Plant Phase 1D 2,587,424.56$ 0% -$ San Gabriel West Booster Station and Mains 3,887,254.18$ 0% -$ Deer Brook Subdivision – Phase II 1,991,962.42$ 0% -$ San Gabriel Elevated Storage Tank 5,150,712.86$ 0% -$ Lively Tract 16" Water Main 3,212,290.50$ 0% -$ Ronald Reagan Blvd Phase 3 5,421,378.94$ 0% -$ W San Gabriel Parkway Mains – Phase 1 1,236,344.00$ 0% -$ Crystal Falls Parkway Mains 1,889,917.15$ 0% -$ TOD Build-Out 6,935,745.92$ 0% -$ 183A - Phase 2 1,115,390.59$ 0% -$ Dream Catcher Mains 1,051,865.61$ 0% -$
Water Outstanding Debt Total 2,198.59$
LEANDER WATER AND WASTEWATER IMPACT FEEJULY 2017 93
Leander Impact Fee AnalysisTable 10Credit Calculation for Wastewater System
DescriptionRemaining Principal
Current Utilization
Total Debt Principal per Current LUE
ExistingConstruction, acquisition, improvements to City sewer system 457,612.00$ 100% 29.01$ Sewer System Improvements 138,092.10$ 100% 8.75$ WWTP Expansion/Sludge Processing 2,466,654.89$ 100% 156.38$ Improvements to existing sewer system 225,963.32$ 100% 14.33$ Wastewater System Infiltration and Inflow Study 27,569.36$ 100% 1.75$ Cedar Park - Brushy Creek Int. Reimburse. 6,617,256.99$ 19% 80.85$ Brushy Creek Regional Wastewater System Equity Buy-in 9,673,792.00$ 19% 118.20$ Horizon Park Lift Station 31,674.37$ 100% 2.01$ Leander WWTP -$ 73% -$ Travisso WWTP -$ 12% -$ Brushy Creek Regional WWTP -$ 71% -$ N. Brushy Creek Int. Seg. 2/3 (18"/15") -$ 17% -$ Block House Creek Int. Seg. 1, 2, 3 -$ 14% -$ Block House Creek Int. Seg. 4, 5 -$ 60% -$ Block House Creek Int. Seg. 6 (24") -$ 18% -$ Block House Creek Int. Seg. 7 (24") -$ 25% -$ Block House Creek Int. Seg. 12 (15") -$ 33% -$ Brushy Creek Int. Seg. 1 (36") -$ 5% -$ Brushy Creek Int. Seg. 2 (36") -$ 8% -$ Palmera Ridge Offsite Wastewater -$ 25% -$ Stewart Crossing Offsite Wastewater -$ 8% -$ Marbella Offsite Wastewater -$ 7% -$ N Brushy WW Interceptor -$ 10% -$ Wedemeyer Wastewater Improvements -$ 0% -$ Liberty Hill Connect - Connecting Facilities -$ 0% -$ Madison Realty ('Completed Segment') -$ 0% -$ Parkway Crossing Offsite Seg. A -$ 0% -$ Parkway Crossing Offsite Seg. B -$ 0% -$ Travisso CIP 5 - Crystal Falls LS -$ 10% -$ Travisso CIP 6 - Crystal Falls FM -$ 10% -$ Travisso CIP 8 - 15-inch GM -$ 10% -$ Travisso CIP 9 - 12-inch GM -$ 0% -$ Crescent North Interceptor -$ 0% -$ Crescent South Interceptor -$ 0% -$
FutureTravisso Water Reclamation Plant Expansion - Interim Phase II 3,357,112.50$ 6% 12.16$ Liberty Hill WW Treatment 5,833,611.00$ 0% -$ Falcon Oaks Wastewater Collection System 3,385,835.28$ 0% -$ Cannon Miehaus Gravity Mains 1,317,023.17$ 0% -$ Bryson/Crescent - TODD Lift Station No. 1 487,200.00$ 0% -$ Leander WWTP Expansion 25,769,365.01$ 0% -$ Travisso WWTP Expansion - Final Phase 1,981,835.96$ 0% -$ North Brushy Creek Interceptor Improvements Seg 13 3,463,342.90$ 0% -$ Lakeline Blvd Gravity Mains - Phase I 4,656,391.11$ 0% -$ Lakeline Blvd Gravity Mains - Phase 2 1,968,583.23$ 0% -$ Lift Station 27 1,848,537.16$ 0% -$ Lift Station 2 Improvements 1,724,704.92$ 0% -$ Mason Creek Interceptor Improvements 1,712,059.96$ 0% -$ North Brushy Creek Interceptor Improvements - Phase II 6,441,492.50$ 0% -$ Brushy Creek Regional WWTP 43,716,235.51$ 0% -$
Wastewater Outstanding Debt Total 423.45$
LEANDER WATER AND WASTEWATER IMPACT FEEJULY 2017 94
LEANDER WATER AND WASTEWATER IMPACT FEE JULY 2017
Maximum Allowable Impact Fees The impact fee consists of the costs attributable to development during the study period for existing and proposed improvements as well as the allocated impact fee study cost. These costs are then divided by the number of LUEs projected to connect to the systems during the study period.
Utility customers pay for capital improvements in two ways: initially through the up-front impact fee and over the long term through utility rate payments. The law governing impact fee calculation was amended in 2001 to include a credit for this portion of the costs that is paid through rates. This study includes the credit as calculated in Table 9 and Table 10. The credit, along with the costs for existing infrastructure, proposed projects, and the study cost is shown in Table 11. Based on this, the maximum allowable impact fee is $3,729.39 for water, $2,888.15 for wastewater, which when summed gives a total fee of $6,617.54. The City of Leander can assess and collect any amount up to these figures.
Table 11: Impact Fee Calculation Systemwide Impact Fee Water System Wastewater System Existing Improvements $64,196,968 $18,413,469 Proposed Improvements $43,694,977 $29,807,121 Impact Fee Study Costs $24,058 $24,058 Subtotal $107,916,002 $48,244,648LUEs Added in 2017-2027 16,583 14,875 Cost per LUE $6,507.798 $3,243.29 Credit Calculated $2,198.59 $423.45 Maximum Allowable Impact Fee $4,309.19 $2,819.84
95
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Water/Sewer Rate Study
BACKGROUND: In March 2017, staff engaged Willdan Financial Services to perform our water rate study. Our previous consultant, Rim Rock Consulting, retired last year. We have since provided the new consultant historical consumption and sales information as well as other meter data, budget information, etc.
Their model is 95% complete and a rate adjustment this year is not anticipated and potentially may not be needed in the near future based upon current growth projections and assumptions. However, it is too early in the analysis to make firm commitments until everything is completed.
In mid-August, the consultant should have a draft report ready for staff review. A full presentation to City Council could be made in September. Even though no rate increases are anticipated, there will be some recommended changes to the water and sewer rate ordinance.
For example, the ordinance will need to reflect the agreement with the City of Georgetown that certain customers in Rancho Sienna are "grandfathered" i.e., as long as those customers remain at their current location, their rates will mirror City of Georgetown rates. Another recommendation, also in light of the Rancho Sienna agreement would be to have the same base rate for 5/8" and 3/4" meters. This change would apply to all customers, not just those in Rancho Sienna. If approved, 3/4" meters would have the same rate as a 5/8". Existing customers would see a reduction in their monthly base rate as a result. Note - this also will affect our Impact Fee rates.
Another change to be recommended will be to address compound meters that are installed due to fire flow requirements on commercial property, including apartments. At present, we've been handling these situations by agreements approved at the City Council level. These agreements fix the monthly charge for a compound meter based upon the smaller (low flow) side of the meter (and therefore a lower rate) rather than the larger (high flow) side. This allows the owner to incorporate the required fire protection system into the overall plumbing and not be penalized with a higher monthly charge.
Other recommendations may be forthcoming, but these are a couple of highlights.
PREPARED BY: Robert G. Powers, Finance Director
96
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Deep Water Intake Phase 2
BACKGROUND: The attached Resolution was approved by City Council on August 18, 2016 in support for the BCRUA Phase 1C Project for funding, design, bidding, and construction of Water Treatment Plant (WTP) and Raw Water Barge improvements, which will provide the BCRUA WTP with a firm capacity of 30 MGD. Please note that Phase 1B in underway consisting of a Re-rate Study proving the success of higher filter loading rates, which should provide a firm capacity of 22 MGD without any required construction additions or modifications. This Resolution also established the City’s position at that time in 2016 on the BCRUA Phase 2 Deep Water Intake Project, i.e., the City did not support proceeding with the funding, final design, bidding, and construction of the Phase 2 Deep Water Intake Project at that time.
The Resolution also provides for a re-evaluation of the City’s positions on the Phase 2 Deep Water Intake Project in July of 2017. As of June of 2017, the City of Leander had 15,564 water connections of which 14,716 were single family residential connections. Without the Deep Water Intake, the BCRUA Water Treatment Plant’s (WTP) capacity is limited to the 30 MGD available from the BCRUA Interim Raw Water Barge with Leander’s share being 14 MDG of the 30 MGD. With Sandy Creek WTP’s 12 MGD, Leander’s total water treatment capacity will be 26 MGD. Projected water demands for 2026 are at or above 26 MGD and the Deep Water Intake will be needed at that time to avoid potentially serious water use restrictions.
The TWDB offers a loan program for the design of water facilities that defers any and all loan repayments without accrual of interest or penalties for a maximum period of eight (8) years or until such time as the subject facilities are completed and placed intooperation. At the upcoming August 3, 2017, Council Meeting, City staff will present forCouncil’s consideration a resolution authorizing the BCRUA General Manager tocommence the pre-application and final application process for Phase 2 Deep WaterIntake Final Design (ONLY!) beginning with the next TWDB application cycle inJanuary of 2018. Should such application be successful, funds should be available byJanuary of 2019 to commence the final design of the Phase 2 Deep Water Intake.
97
FINANCIAL CONSIDERATION: Leander’s estimated share Phase 2 Final Design Cost through TWDB Deferred Loan funds is $8M.
ATTACHMENT: 1. Resolution of August 18, 20162. Deepwater Intake Phase 2 Presentation
PREPARED BY: Wayne S. Watts, P.E., CFM, City Engineer
98
RESOLUTION NO. 16- 017- 00
A RESOLUTION OF THE CITY OF LEANDER, TEXAS,
SETTING FORTH THE CITY' S POSITION REGARDING
PROCEEDING WITH PHASE 1C AND PHASE 2 OF BCRUA
PROJECT
WHEREAS, the City of Leander, Texas ( the " City"), along with the City of CedarPark and the City of Round Rock ( the " Member Cities"), is a participating and foundingmember of the Brushy Creek Regional Utility Authority, Inc. ( the " BCRUA");
WHEREAS, the BCRUA was created to finance, construct, acquire, own, operate,
and maintain the BCRUA Project, being the land, improvements, and facilities used for thetreatment of raw water and delivery of treated water to the Member Cities, as more
particularly defined in the agreements between the BCRUA and Member Cities;
WHEREAS, the BCRUA Project is made up of multiple phases;
WHEREAS, the Member Cities receive or are able to receive treated water from the
completed phases of the BCRUA Project and other treatment sources available to them, and
phases that are underway or that are planned to proceed will increase the treatment capacityof the BCRUA Project; and
WHEREAS, the City desires to express its position with respect to proceeding withcertain phases of the BCRUA Project;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THECITY OF LEANDER, TEXAS:
Section 1. Phase 1C of the BCRUA Project. The City supports and agrees to proceedwith Phase 1 C of the BCRUA Project, subject to obtaining required financing and approvals.
Section 2. Phase 2 of the BCRUA Project. The City does not support proceedingwith applying for financing, designing, or constructing Phase 2 of the BCRUA Project at thistime. The City will re- evaluate the City' s water demand and projections in July 2017 and willdetermine whether the City supports proceeding with Phase 2 of the BCRUA Project at thattime.
Section 3. Effective Date. This resolution shall be effective immediately uponadoption.
Section 4. Open Meetings. It is hereby officially found and determined that the meetingat which this ordinance is passed was open to the public as required and that public notice of the
Page 1 of 2
99
time, place, and purpose of said meeting was given as required by the Open Meetings Act,Chapt. SSI, Tex. Gov' t. Code.
PASSED AND APPROVED this the 18`h
day of August, 2016.
TH F ER, TEXAS
r
istop r Fielder, Mayor lion Abruzzese, ay ro Tem
Andrea Navarrett Michelle Stephenson
Shanan Shepherd Jeff eiler
F
pF
Troy Hilli
PO
Y
ATTEST:c
i
Debbie Haile
Page 2 of 2
100
Phase 2 Project Layout
• Deep Water Intake with accessto lakebed of 556 ft‐MSL
• 9,000 ft Intake Tunnel
• 145 MGD Pump Station
• 2,800 ft Transmission Tunnel
• Significant electrical serviceupgrades
103
Phase 2 Project Funding and Schedule
• Total project costs = $185M (Phase 1D and 2)• City of Leander cost allocation is 42.95%• Funding sources: Texas Water Development Board SWIFT
o Deferred Loan
o Low Interest Loan
o Board Participation Loan
• Schedule durations:o Design and Bid Phases – 2.5 years
o Construction Phase – 5 years
104
Construction Schedule Comparison
Work Shaft(12 mon)
Work Shaft(10 mon)
Trans Tunnel (10 mon)
Intake Tunnel(18 mon)
Intake Tunnel(15 mon)
Pump Station(30 mon)
Pump Station(27 mon)
Year 1 Year 2 Year 3 Year 5Year 4
5 Years & 4 Months
4 Years & 10 MonthsAustin WTP4 Schedule
BCRUA Phase 2 Schedule
Year 0 Year 6
105
Phase 2 Timeline – 2017 Final Design SWIFT Application
Bid & Award
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Final Design SWIFT Application
Construction SWIFT Application
Construction
Construction SWIFT Application
Construction
Final Design
Bid & Award
Project Schedule A
SWIFT Bonds Close
Project Schedule B (same as Schedule A with one year lag in Construction SWIFT application)
SWIFT Bonds Close
SWIFT Bonds Close
106
Bid & Award
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
Final Design SWIFT Application
Construction SWIFT Application
Construction
Construction SWIFT Application
Construction
Final Design
Bid & Award
Project Schedule C
Project Schedule D (same as Schedule C with one year lag in Construction SWIFT application)
Phase 2 Timeline – 2018 Final Design SWIFT Application
SWIFT Bonds Close
SWIFT Bonds Close
SWIFT Bonds Close
107
Capacity Required from BCRUA WTP
02468
1012141618202224262830
2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040
Capa
city R
equi
red
for B
CRUA
WTP
(MGD
)
Year
LeanderCedar ParkRound Rock
108
05
101520253035404550556065707580
2016 2018 2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040
Capa
city R
equi
red
for B
CRUA
WTP
(MGD
)
Year
Project Phasing
A B
C D
Phase 1C
Existing Capacity
Phase 1B
Phase 2 Capacity Needed
Combined Capacity Required fromBCRUA WTP
109
Funding Plan – Schedule A
$0
$10,000,000
$20,000,000
$30,000,000
$40,000,000
$50,000,000
$60,000,000
$70,000,000
$80,000,000
$90,000,000
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
2018 2019 2020 2021 2022 2023 2024 2025 2026
Cum
ulat
ive F
undi
ng
Annu
al Fu
ndin
g
Planning and Design Funds Construction/Other Funds Cumulative Total
Planning and Design Funds Can Be Deferred
to Until 2026
110
0
5000
10000
15000
20000
25000
30000
$0
$2,000,000
$4,000,000
$6,000,000
$8,000,000
$10,000,000
$12,000,000
$14,000,000
$16,000,000
$18,000,000
2018 2019 2020 2021 2022 2023 2024 2025 2026
Estim
ated
Num
ber o
f Con
nect
ions
Annu
al Fu
ndin
g
Planning and Design Funds Construction/Other Funds Number of Connections
Growth Projection – Schedule A
Assumes 14,200 connections in 2017 and 1,200 connections/year growth rate
111
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Comprehensive Plan Implementation
BACKGROUND: In October of 2015, the City Council approved an updated Comprehensive Plan. The Plan includes a number of recommendations and specific action items in order to implement the Plans goals.
At the February and July 2016 City Council retreats, the Council gave staff direction on the highest priority implementation items. This agenda item is intended to provide an update on the main implementation actions for FY 2017-18.
ATTACHMENT: 1. Implementation actions proposed for FY 2017-18 and current status
PREPARED BY: Tom Yantis, Assistant City Manager
112
Proposed FY 2017-18 Comprehensive Plan Implementation Actions for Short- and Mid-Term Recommendations
Goal - Promote the TOD as an urban destination within a suburban community Recommendation - Develop a highly visible public space within the TOD
Action - Extension of Metro Drive and planning of new recreation center and Brushy Creek trails
Status - Engineering is underway for Metro Drive extension. Phase 1 of Brushy Creek trail on south side of Brushy creek is complete. Capital Metro is working on engineering for the first phase of trail on the north side of Brushy Creek. ACC and Trailside Oaks will also complete segments of the Brushy Creek trail with their developments.
Recommendation - Recruit TOD Developers
Action - Ongoing effort, current focus is with active developments in the TOD.
Status - Incentive agreement completed with St. David's hospital. Additional TIRZ reimbursement agreements are in process.
Recommendation - Develop a P3 (Public/Private Partnership) Strategy for the TOD Area
Action - Work with Capital Metro on an RFI (request for information) for a developer to redevelop the Capital Metro site. Work with developers on potential P3 north of the ACC site.
Status - Capital Metro issued the RFI in the fall of 2016. They did not receive any responses to the RFI. They plan to issue a new RFI at a later date once more of the current development is further along. The proposed development north of ACC may be another opportunity for a P3.
Recommendation - Define and participate in catalyst projects that will build momentum in the TOD and spur private investment
Action - Work with Capital Metro on RFI for redevelopment. Complete a development agreement with St. David's on new hospital site. Work with ACC on joint planning for recreation center. Work on Metro Drive extension and Brushy Creek trail extension, and partner with other developers to facilitate development projects.
Status - see items above
113
Goal - Enhance Leander's public spaces to create and link destinations Recommendation - Develop and implement streetscape designs for key corridors
Action - Revise the zoning ordinance to create standard streetscape elements for major corridors and residential streets. Utilize tree mitigation funds to plant trees on major corridors. Complete East Crystal Falls median landscaping. Include new streetscape standards on all new major corridor projects.
Status - Updated the zoning and subdivision ordinances to implement streetscape standards (FY 16-17). East Crystal Falls median landscape project design is complete and will be bid this summer. Use of tree mitigation funds for corridor tree planting is proposed in the FY 17-18 budget. All new City and developer built major corridors will include the adopted streetscape standards.
Recommendation - Develop a wayfinding and signage program and create a sense of arrival into the city with gateways that reflect Leander's identity
Action - no action planned for FY 2017-18
Recommendation - Prepare a Public Space Master Plan
Action - no action planned for FY 2017-18
Recommendation - Develop a corridor beautification strategy
Action - Update the zoning ordinance to create standard streetscape elements for major corridors. Utilize tree mitigation funds to plant trees on major corridors. Complete East Crystal Falls median landscaping. Include new streetscape standards on all new major corridor projects.
Status - Updated the zoning and subdivision ordinance to implement corridor streetscape standards (FY 16-17). East Crystal Falls median landscape project design is complete and will be bid this summer. Use of tree mitigation funds for corridor tree planting is proposed in the FY 17-18 budget. All new City and developer built major corridors will include the adopted streetscape standards.
Recommendation - Provide safe, sound and well-maintained neighborhoods
Action - Conduct community cleanups
Status - Cleanups proposed in the FY 17-18 budget.
Recommendation - Enhance Leander's tree canopy
Action - Continue to implement the tree preservation ordinance, develop a plan to utilize tree mitigation funds to plant new trees
114
Status - Tree preservation standards continue to be applied and mitigation fees collected for development projects where protected trees are removed. FY 17-18 budget proposal includes the use of tree mitigation funds to plant trees on major corridors.
Goal - Connect destinations Recommendation - Implement a Complete Streets Policy to encourage safety, mobility and an active lifestyle in the City of Leander
Action - Update the Transportation Plan to include Complete Street elements on all major thoroughfares and link with hike and bike trails
Status - Updates to the transportation plan to implement complete street standards are were adopted in FY 16-17. New street designs will be implemented on City CIP projects and development projects subject to the new standards. Additional updates to the transportation plan will be presented to develop a complete bicycle network including re-striping existing streets where possible to add bike lanes.
Recommendation - Improve bicycle and pedestrian amenities
Action - Update the Transportation Plan, complete Brushy Creek trail construction
Status - Updates to the transportation plan to implement complete street standards were completed in FY 16-17. See Brushy Creek trail implementation status above. Additional updates to the transportation plan will be presented to develop a complete bicycle network including re-striping existing streets where possible to add bike lanes.
Recommendation - Work with Capital Metro and other interested parties to develop local area circulators for convenient access between neighborhoods, activity centers, and the regional transit network
Action - Work with Capital Metro to begin first circulator bus service in 2017
Status - Capital Metro adopted the Connections 2025 Plan earlier this year. The plan designates the Leander station as a Mobility Hub which will provide options to provide local circulator service. The timing of when this will be implemented is not set.
Recommendation - Continue to plan and develop a functional transportation system that is coordinated with the Future Land Use Plan
Action - Update the Transportation Plan, complete new transportation projects including Raider Way/Woodview, Metro Drive, and Brushy Creek trails
Status - Updates to the transportation plan to implement complete street standards were adopted in FY 16-17. Transportation construction projects are currently in progress.
115
Goal - Create strong neighborhoods with a variety of housing options Recommendation - Amend ordinances to accommodate a mixture of housing types
Action - Update the zoning and subdivision ordinance to provide for a mixture of housing types within neighborhoods. Revise the zoning ordinance to provide zoning categories for single-family detached condominiums and small scale multi-family products such as fourplexes, cottage courts, etc.
Status - Updates to the zoning and subdivision ordinance to provide more housing variety were adopted in FY 16-17. The new zoning categories include CH - Cottage Housing, NR- Neighborhood Residential, and TH - Tiny House.
Goal - Foster civic pride Recommendation - Conduct a branding study for the entire city
Action - No action planned for FY 2016-17
Recommendation - Consistently promote the City
Action - Add a PIO
Status - A PIO was hired who began in May.
Recommendation - Capitalize on current and potential future visitor activities
Action - Partner with the Chamber to enhance special events
Status - Ongoing partnerships continue for special events including the Old Town Street Festival, and Old Town Summer Nights.
Recommendation - Increase programming that brings the community together while simultaneously attracting visitors from outside Leander
Action - Partner with the Chamber to enhance special events
Status - Ongoing partnerships continue for special events including the Old Town Street Festival, and Old Town Summer Nights.
Goal - Continue to expand infrastructure to serve Leander residents Recommendation - Invest in utility planning that supports the land use pattern envisioned by the Future Land Use Map
Action - Update the Water and Wastewater Master Plan, complete utility extension and oversizing projects
116
Status - Water and Wastewater master plans are in the process of being updated and will be complete in 2017. An impact fee study is in process with an anticipated completion in 2017. Utility capital improvement projects are ongoing.
Goal - Continue to provide premium public safety services to Leander residents
Recommendation - Continue to provide excellent fire and emergency services in all areas of the community
Action - Implement Police and Fire staffing recommendations for FY 2016-17, complete construction of Fire Station 4 and the relocation of Fire Station 1
Status - FY 216-17 staffing plans are being implemented. Fire Station 4 is under construction and scheduled for completion in summer 2017. Fire Station 1 design is underway and construction should begin in 2017.
117
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Charter Review Commission Amendments
BACKGROUND: Applications are currently being accepted for the Charter Review Commission with plans for interviews and appointments on or about August 17th. In considering guidelines for the Commission, the Council may desire to charge the Commission with reviewing the following:
1. Proposing an amendment governing franchises based on the recent legislative session2. Proposing an amendment to fill a vacancy of 12 months or less by appointment as the
procedure for filling such vacancies verses holding a special election
ATTACHMENT: 1. Memorandum from City Attorney
PREPARED BY: Dara Crabtree, City Secretary
118
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Declaring Population over 50,000 BACKGROUND: The City's current population estimate has our population at 52,606 as of June 2017. Once cities exceed 50,000 population certain rights and obligations follow. Some of the bigger items to consider are the following:
• ETJ expansion • Traffic signal maintenance on TxDOT roads • CDBG entitlement eligibility • Videotaping council meetings (previously discussed)
ATTACHMENTS:
• Local Government Code Chapter 42 • Texas Administrative Code – TxDOT Traffic Operations • CDBG Entitlement Eligibility • Population Estimate Update as of June 4, 2017
PREPARED BY: Tom Yantis, Assistant City Manager
121
Introduction
In This
Fact Sheet
Nature of
Program
APPENDIX A
COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM
ENTITLEMENT PROGRAM
FACT SHEET
The program provides annual grants on a formula basis to entitled cities and counties to develop viable urban communities by providing decent housing and
a suitable living environment, and by expanding economic opportunities, principally for low- and moderate-income persons.
,I Grantee Eligibility ,/ Requirements ,/ Citizen Participation
,/ Legal Authority/Information Sources
HUD awards grants to entitlement communities to carry out a wide range of community development activities directed toward revitalizing neighbor-hoods,
econonnc development, and providing improved community facilities and
services.
Entitlement communities develop their own programs and funding priorities.
However, grantees must give maximum feasible priority to activities which benefit low- and moderate-income persons. A grantee may also carry out activities which aid in the prevention or elimination of slums or blight, or to
which it certifies are designed to meet other community development needs
having a particular urgency because existing conditions pose a serious and
immediate threat to the health or welfare of the community where other
financial resources are not available to meet such needs. CDBG funds may not be used for activities which do not meet these broad national objectives.
CDBG funds may be used for activities which include, but are not limited to:
•!• Acquisition of real property;
•!• Relocation and demolition;
•!• Rehabilitation of residential and non-residential structures; •!• Construction of public facilities and improvements, such as water and
sewer facilities, streets, neighborhood centers, and the conversion of
school buildings for eligible purposes; •!• Public services, within certain limits;
•!• Activities relating to energy conservation and renewable energy
resources; and
Community Development Block Grant Program 125
Grantee
Eligibility
Requirements
Citizen
•:• Providing assistance to profit-motivated businesses to carry out
economic development and job creation/retention activities.
Generally, the following types of activities are ineligible: acquisition,
construction, or reconstruction of buildings for the general conduct of
government; political activities; certain income payments and construction of
new housing by units of general local government.
Central cities of Metropolitan Statistical Areas (MSAs ), other metropolitan
cities with populations of at least 50,000, and qualified urban counties with
populations of at least 200,000 ( excluding the population of entitled cities)
are entitled to receive annual grants. HUD determines the amount of each
entitlement grant by a statutory dual formula which uses several objective
measures of community needs, including the extent of poverty, population,
housing overcrowding, age of housing, and population growth lag in
relationship to other metropolitan areas.
To receive its annual CDBG entitlement grant, a grantee must develop and
submit to HUD its Consolidated Plan, (which is a jurisdiction's
comprehensive planning document and application for funding under the
following Community Planning and Development formula grant programs:
CDBG, HOME Investment Partnerships, Housing Opportunities for Persons
with AIDS (HOPWA), and Emergency Shelter Grants (ESG)). In its
Consolidated Plan, the jurisdiction must identify its goals for these programs,
as well as for housing programs. The goals will serve as the criteria against
which HUD will evaluate a jurisdiction's Plan and its performance under the
Plan. Also, the Consolidated Plan must include several required
certifications, including the certification that not less than 70% of the CDBG
funds received, over a one, two, or three year period specified by the grantee,
will be used for activities that benefit low- and moderate-income persons,
and that the grantee will affirmatively further fair housing. HUD will
approve a Consolidated Plan submission unless the Plan ( or a portion of it) is
inconsistent with the purposes of the National Affordable Housing Act or is
substantially incomplete.
Following approval, the Department will make a full grant award unless the
Secretary has made a determination that the grantee: (1) has failed to carry
out its CDBG-assisted activities in a timely manner; (2) has failed to carry
out those activities and its certifications in accordance with the requirements
and the primary objectives of Title I of the Housing and Community
Development Act of 1974, as amended, and with other applicable laws; or
(3) lacks a continuing capacity to carry out its CDBG-assisted activities in a
timely manner.
A grantee must develop and follow a detailed plan which provides for and
encourages citizen participation and which emphasizes participation by
Community Development Block Grant Program 126
Participation
Legal Authority
Information
Sources
persons of low- or moderate-income, particularly residents of predominantly
low- and moderate-income neighborhoods, slum or blighted areas, and areas
in which the grantee proposes to use CDBG funds. The plan must: provide
citizens with reasonable and timely access to local meetings, information,
and records related to the grantee's proposed and actual use of funds;
provide for public hearings to obtain citizen views and to respond to
proposals and questions at all stages of the community development
program, including at least the development of needs, the review of proposed
activities, and the review of program performance; provide for timely written
answers to written complaints and grievances; and identify how the needs of
non-English speaking residents will be met in the case of public hearings
where a significant number of non-English speaking residents can be
reasonably expected to participate.
Title I of the Housing and Community Development Act of 1974, Public
Law 93-383, as amended; 42 U.S.C.-5301 et seq.
If you are an interested citizen, contact your local municipal or county
officials for more information. If your local government officials cannot
answer your questions, or if you are a local official, contact the HUD field
office* that serves your area. Note that the local government administers the
program and determines which local projects receive funding.
Information about HUD field offices may be found on the World Wide Web
at http://www.hud.gov/local.html.
* Hearing impaired users may call the Federal Information Relay Service at
1-800-877-8339.
Community Development Block Grant Program 127
CITY OF LEANDERPOPULATION ESTIMATE 2017 (as of 6-4-2017)
Type No. of Units Outside City Limits Occupancy Rate
Total Units
Inside City People Per Unit Total People
Single Family 14,563 67 14,496 3.34 48,417
Duplex* 53 53 3.33 176
Multi Family 1,339 90% 1,205 3.33 4,013
TOTAL 52,606
Multi Family Count Detail
Cedar Ridge 152
Crystal Falls Village 36
Lakeline Apartments 264
Merritt Legacy 208
Montierra Ranch 20
The Park at Crystal Falls 242
Senior Village at Leander Station 192
The Standard Apartments 225
1339
* duplex was being double counted. Fixed back to 2012.
128
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Golf Course Update
BACKGROUND: Staff has reviewed the recommendations in the Billy Casper Golf Course Report regarding the maintenance and operations at the Crystal Falls Golf Course. The attached documents will outline the status of implementation of the recommendations.
ATTACHMENTS: 1. Maintenance Recommendations Matrix2. Operations Recommendations Matrix
PREPARED BY: Mark Tummons, Parks & Recreation Director
129
Billy Casper Crystal Falls Golf Course Recommendations
Initiative Item(s) Completed
Not Completed Notes/Adjustments
Area 1 - GREENS Objective Greens are to be maintained year round. With the
exception of unforeseen events, the greens should be consistent throughout the year, rolling around 10 in the summer and 11-12 in the winter. Greens are USGA spec and have Tifdwarf Bermudagrass as the putting surface. There is no plan to over seed greens. There are no subsurface issues at the present time.
X Greens are always maintained year round. We adjust all practices as weather, staff, and unforeseen events happen. The greens are the top reason patrons come to play our course. Weather changes and as it dose we do the best humanly possible to produce a great green for all to enjoy. Notice ALL is the goal not the select few that want fast greens all the time. Our green speed goal is NOT what Billy Casper recommends our green speeds to be. Billy Casper recommendations for the green speed is a copy paste of there course recommendation template. They did not keep in mind that we have very contoured greens and if mowing heigths on our greens are to low it impacts turf health that compounds into playiblity/qualitiy. This is why Crystal Falls green speed goals are 8.5" to 9.5" for regular play during the growing season of TifDwarf and during the winter green speeds of 9 to 10. Green speeds of 10 plus we do not have many fair hole placement locations which will limit our ability to manage green traffic and quality. On the over seed plan yes we have always had one! We overseed the greens with poa trivialis which the USGA recommends for TifDwarf greens in the winter months to protect our base grass from winter wear, and to control green speeds during the winter months.
Goals 1. Maintain 100% coverage year round X 2. Combat encroachment of 419 on greens
perimetersNA NA Not applicable. This is for a course with bent grass greens.
Maybe a copy paste from BCG template 3. Work on subsurface soil conditioning for long
term healthX We have always done this in past years with core aeration. Now
we use the new Air2G2 aerator. Last year we did not have as a severe impact on the putting surface in the early spring season. We were still able to aerate the greens with very little disruption to playing golf. It also allowed us to core aerate when we have better weather conditions for a faster recovery time.
4. Eradicate Goose grass pressures on all greens X Goose grass is our #1 target weed in the greens. With careful planning we will get better control on the weed this coming year. It will not be an easy or fast fix, this could take a few seasons to get "eradicate" control. Industry wide we are all looking for better ways to manage goose grass. Our chemical control choices are
130
very limited on use for the greens. Keep in mind yes we can kill/control goose grass with extreme caution not to kill or damage our TifDwarf greens.
Procedure 1 MOWING Frequency – Mowing procedures have gone to an as needed schedule. During the growing season 6-7 mowing’s per week are scheduled. From November to March we will not mow greens as frequently and roll instead.
X Greens management is a careful balance of mowing vs rolling for different factors such as weather conditions, amount of play, and staff.
Pattern – Mowing direction is rotated daily based upon the “clock schedule”…6-12, 8-2, 3- 9, 10-4. The clean-up pass is mowed with a walk mower, typically 3 days during the summer and as needed in the cooler months.
X We have had a "clock schedule" mowing rotation since 2003. We do not have and have never had walk mowers. We do not mow clean up pass every day. Our clean up passes are every other day and dependent on conditions.
Height – Mowing height fluctuates throughout the year based on the health of the greens and weather patterns. While speed is a concern, the health is a priority. The height of cut is typically .150”. After aerification in June the height may be raised slightly
X We have always watched the health of the greens and adjusted the height depending on our cultural practices, weather patterns and time of the season.
Training – Operators are trained by Superintendent, Assistant, or foreman. They first sit and watch an instructional video, when applicable, and then are given a briefing by our mechanic on how and what to check and on the basic operation of the piece of equipment before starting it up. The trainer then takes the operator out for hands on training. Maintenance training sign off sheets will be completed when the trainer is confident of the employee’s ability to operate the equipment safely and correctly.
X Our training is ongoing and continued. We strive to learn and implement the best management practices available to keep our greens in good condition for our patrons to enjoy.
Triplex/ Walkmow – Greens are triplex mowed throughout the year. Walkers are used to complete the perimeter pass on all greens. Walkmowers are also used on wear or stress related greens. This is most applicable during the winter months where sunlight is insufficient.
X We do not have walk mowers. We roll in place of walk mowing for stress related greens.
131
Clippings – Clippings are gathered daily throughout the year. Buckets are left off after a granular fertilization application and topdressing to minimize mower pickup.
X We have always done this for many years.
Rolling - The Superintendent may choose to roll greens in lieu of or in conjunction with mowing so proper speeds can be maintained. Also, rolling may be necessary in addition to mowing in the case of a special tournament or outing. Rolling is also performed following an aerification to help smooth out the surface.
X We also roll more when weather stresses of winter when low grass blade growth would not have anything for the mower to cut. Also in the heat of summer to help keep the greens in better health we will roll in place of mowing.
Rain/weather – In the event of excessive rain, mowing may not take place in order to eliminate turf damage. Scalping is a direct result of wet conditions. The greens perk well so we would only need to squeegee them in the event of a major event where restarting or continuing play is a major concern.
X Weather events of rain we have always adjusted well to keep our greens in as good condition that weather allows.
Procedure 2 SCOUTING Greens are inspected daily by the Superintendent, Assistant, Technician, and other key supervisors for:
• Quality of cut• Disease/weeds• Moisture• Insect presence• Proper pin location and setting• Vandalism• Items out of the ordinary
XX Greens are always inspected daily.
Procedure 3 BALLMARKS During cup changing we do as many as time allows. Ball marks are addressed by course set-up personnel and greens mowers. Employees are encourage to repair as many ball marks as possible, but realization is that not all can be repaired and some may remain
X Along with the employees doing what we can with time pressures to course set up we do have a few course marshalls and volunteers that help us.
Procedure 4 VERTICUTTING/GROOMING With Tifdwarf greens, it is best to get into a X We will start verticutting the greens based on plant health. As
132
verticutting schedule during the months of May- September. The goal is to verticut 4 – 6 times during that period. We will go down to ¼” positive at 1” spacing during our first aerification. A second direction will also be done at 1/8” positive. This process will be done two more times throughout the summer. Lighter verticutting may be necessary in between these more aggressive verticuttings to further help with grain and thatch.
we all know weather in central Texas can change and you can not stamp a date on when you will be able to start in the spring. On average April sometimes as early as March verticutting can start. Need to take note in the hot month of August sometimes plant health will not allow verticutting. Verticut spacing width is set at 1". Depth of verticut will again depend on the plant health. Something that Billy Casper golf left out is you need to use the "clock system" for your verticutting so your not verticutting same direction every time you verticut. We have always used this system during my tenure here. Also we verticut both directions to aid in getting a true verticut.(example verticut direction from 6 o'clock to 12 and then return back on the same pass from 12 to 6) Also we have groomers on one of the greens mowers that weuse during the growing season to aid in smoothness. Frequencyof grooming again is based on plant health.
Procedure 5 SAND TOPDRESSING Sand is applied to improve surface smoothness and to breakdown the thatch. Best practice is to lightly dust the greens during the same time frame as the verticutting. Typically best to topdress right behind the verticutting to make sure the sand gets into the target thatch layer. During core aeration a heavy topdress will be applied to properly fill the holes creating channels for gas exchange and water movement
X We would like to topdress right after verticutting but with limited staff this is difficult to accomplish. Verticutter, Greens Mower, detail/cup changer/blower, Topdresser, roll in or drag in topdress = 5 staff and would still need staff to mow tees/collars, fairways, 2 rough mowers in the morning. So we schedule topdressing to follow as staffing allows.
Procedure 6 CORE AERATION Core aeration plays a pivotal role in the long term health of the greens. It is critical that core aeration be completed at pulling a ½” core plug
X We adjust our aeration hole and spacing size based of testing.
Procedure 7 LEAF AND DEBRIS REMOVAL Greens are inspected prior to mowing by each operator. If there is any debris present (sticks, tees, spikes…), they are instructed to remove it and begin mowing. If there is a heavy amount of leaves/debris on the putting surface, than we will send an operator out with a blower ahead of the mowers to remove it
X We have a task everyday called Detail. The detail employee is the leaf and debris removal operator for the day along with other task for this operation. The detail employee helps any of the mowers clean (sticks, tees, rocks..) off of the area that the mowers will for that day.
133
Procedure 8 FERTILITY Greens are fertilized with a foliar application once a week dependent on temperatures and weather patterns. Prior to the 2 aerifications a granular will be applied to supply adequate fertility to compensate for cultural practices as well as create an opportunity to amend the soil.
X We are on a bi-weekly sprayable program of green fertility with monthly soil amendments during the growing season based on soil testing science. Granulars are used before aerifications to speed up healing and soil amendment.
Procedure 9 HOLE LOCATIONS Use a front, middle, back pin location that moves from front to back with set-up personal responsible for the designation of hole location. Change cups daily to alleviate wear around the green
X Hole locations are based on playablity and health of the green area. We have severely undulated greens and with fast green speeds the hole locations can become very limited and challenging. Hole locations are designated with staff interpretation of the playability/smoothness/plant health of the location hole is set. During the weekdays we choose more challenging hole locations to save the less challenging for higher volume weekends to reduce wear. We use the smaller flag (repair ball marks flag) to show hole location from the fairway. (small flag at the top part, hole in the back of green. Small flag in the middle of the flagstick hole in the middle of the green. Small flag on the lower part of the flagstick, hole in the front part of ther green) Hole changing schedule currently is Tuesday, Thursday, Saturday, Sunday dependent on amount of play, staffing, and weather conditions.
Procedure 10 SYRINGING/HANDWATERING/OVERHEAD WATERING Hand watering greens is done periodically throughout the year. Overhead watering is done as needed with percentages fluctuated daily depending on current and extended forecasts. Individual head control is obtainable with greens monitored daily and individual percentages adjusted up or down. Rain – Rely on the rain from Mother Nature and the wells to stock ponds throughout the year to supply us with our water to irrigate the golf course.
X On rain. Our heavy dependence on the rain to fill ponds for irrigation is no more. We have effluent water now to irrigate as needed where in the past our course to have fairways and rough was dependent on rain and well water.
Area 2 - TEES, COLLARS AND APPROACHES Objective Tees are maintained year round. With the exception
of unforeseen events, the tees should be consistent X Tees and collars are always maintained year round. We adjust
all practices as weather, staff, and unforseen events happen. The Tees and collars are overseeded with Perennial ryegrass in
134
throughout course. Tees have a base grass of 419 Bermudagrass. The main objective for the tees is to present a clean, level surface to tee off from.
the winter months for effluent water use, wear tolerance, and playability in the winter. Weather changes and as it dose we do the best humanly possible to produce great tees for all to enjoy. We inspect, clean up broken tees, debris, and move tee markers to spread out wear and traffic on the Tees for better long term quality.
Goals 1. Maintain a healthy, smooth, consistentstand of turf to tee from.
X
2. 5/8” core aerate tees twice this season. We core aerate in the spring and solid tine in late summer. 3. Create a plan to start leveling tee surfaces We are going to need plan on late July and early August which
tees need the most attention. Then we can 1) sod cut off the turf off of the tee to reuse the turf 2) regrade the surface area soil. 3) replace the sod.
Procedure 1 MOWING a. Frequency – Tees are mowed twice a weekthroughout the year.b. Height - Mowing height is typically .500throughout the year. We will lower the height down as we go through transition in the Spring and raise them up periodically in summer and lower them back down again prior to overseed. c. Direction – Mowing direction is alternatedbetween mowings based on a “clock setting”, 8- 2,6-12 and 10-4
XX We have been mowing tees and collars 3 times per week. Some adjustments to mowing frequency are made do to weather such as frost delays in the winter and heat stress in the summer.
Our Mowing heights are .350” to .500” range depending on plant health and time of season.
We have always used the clock system of mowing (12-6,2-8,10-4) with clean up pass alternating clock wise or counter clockwise.
Procedure 2 SCOUTING Tee Markers – Tee markers are checked daily during course set up. On days that we mow, the first one there between the tee mower and the setup employee moves them off, and the second sets them back on. Alignment – Tees are placed on to line the golfer up at the center of the fairway/landing area and to the middle of the green on par threes. We teach the T-Square method. Rotation – If pin is located in the back, then tees are placed forward; if pin is in the front, then tees are placed back; and if pin is middle,
XXXXX We have always done this with tee markers.
With Alignment we have always done this. For new employees and training we have made a tee square to help them learn alignment the proper way.
Rotation. I do not agree with this recommendation! Rotation of the tee placement should not be limited to where the pin locations are. Good tee placement has 3 important factors. 1) Tee turf condition. Need to spread and equal out the ware traffic. 2) Pace of play. A blend of front , back, and middle tee locationbalance pace of play. 3) Prevailing wind direction.
Location, Spacing, and Rotation need to be together.
135
then the tees are middle. Spacing – All tees are spaced 6 paces apart and placed on a healthy stand of turf. Location – The course setup employee is responsible for deciding the location of the markers. He picks the cleanest spot every day. On weekends, tees are set up with pace of play in mind…easy = better scores = faster rounds = happier golfers…
Procedure 3 AERATION/VERTICUTTING Aerification takes place in the early and late summer. Verticutting will be scheduled as needed.
X Tee and collar aerification takes place late March to April depending on the weather. With verticutting we have done as needed which most of the time is two times per growing season on average.
Procedure 4 SAND TOPDRESSING Topdressing takes place in conjunction with aerification in the summer. Divots are filled periodically throughout the year by hand as part of routine maintenance.
X Topdressing divots on tees is done by hand on par 3’s as needed.
Procedure 5 FERTILITY Our goal is to get 3-4 lbs. of N on the tees throughout the growing season. Spring application will be a pound of N, in the form of Polyon. Subsequent applications will come from organic fertilizer.
X Tees are on a liquid fertility program with some slow release granular. Polyon is only one of many types of slow release N that we can use. The lbs. of N applied to the tees per year is better set with the science of soil testing. It would be a waste to over fertilize and not use science.
Procedure 6 PLANT PROTECTANTS/WEED AND INSECT CONTROL Tees are included in our course pre-emerge program and remain relatively weed free throughout the year. Any weed that may breakthrough is spot treated with the proper herbicide. The tees will also be included in this year’s program. Any worm activity will be treated with either acephate (orthene) or lambda- cyhalothrin (Scimitar). Any fire ant activity will be treated with the Texas two-step. Growth regulators applications are made in the summer months for reduced clipping yield and
X Tees we have a pre-emerge program for weed control. We also have grub and fire and plans in place to control these pests as well. Growth regulators on tees is a tool I prefer to use only if needed. You can manage clipping yield with the proper application of fertility using the science of soil testing saving dollars on the cost of growth regulators.
136
increased turf density. Procedure 7 LABORATORY TESTS
Soil tests will be performed once per year. X We test soils one time per year and any other time we need to identify a problem with the tees.
Procedure 8 LEAF AND DEBRIS REMOVAL Broken tees and such are picked up as part of the course setup responsibility and any extremely covered tees are blown off as needed.
X Broken tees, cigarette buds, leafs, sticks, limbs, and other debris area all pick up or blown off daily and as needed to clean teeing ground.
Procedure 9 SYRINGING/HAND WATERING/OVERHEAD WATERING Tees are irrigated with overhead irrigation during nighttime irrigation cycles. With individual percentages adjusted to compensate for soil profile.
X Some tees need hand watered if heat stress starts to show in the health of the turf which happens with consistent Temps above 97 degrees .
Area 3 FAIRWAYS Objective Fairways are maintained year round. With the
exception of unforeseen events, the fairways should be consistent throughout course. Fairways have a base grass of 419 bermudagrass. The main objective for the fairways is to present a clean, consistent and fair lie to hit from. Efforts will also be made to create more definition between fairways and roughs.
X This has been our standard for all the years of my tenure here.
Goals 1. Maintain consistent perimeter lines andoriginal fairway boundaries
X
2. Maintain weed free fairways We have a good pre-emerge program in place that helps keep weed populations under control. Our main weed to control with our spot spraying program is dallas grass and goose grass in the summer. We have runoff areas that the weeds can travel into our lower fairways such as 4,6,7,9,10,12,13,17 from the surrounding area.
3. Continue to remove rocks in fairways whenpossible.
X This has been our standard for all the years of my tenure here.
4. Focus on creating better definition betweenfairways and roughs.
X This has been our standard for all the years of my tenure here.
Procedure 1 MOWING a. Frequency – Fairways are mowed two times
a week throughout the year unlessX
137
tournaments or weather dictate otherwise. b. Height - In order to match up the
tee/approachmowers, mowing height for the fairways
range from .500 to .625 depending on thetime of year.
c. Direction – As with the tee mowers,mowing directionis alternated between mowings based on a
“clock setting”, 8-2 and 10-4 and 12-6, wewill also use 1/2 and 1/2 direction.
Procedure 2 SCOUTING Along with the Superintendent and Assistant, operators are responsible for keeping an eye out for anything out of the ordinary on the fairways. They get the chance to see every square inch of every fairway twice a week.
X Our scouting of the course is always daily and ongoing.
Procedure 3 AERATION/VERTICUTTING Fairways will be sliced periodically during the season. The heaving rock content of the soil inhibits traditional hollow or solid core aerations.
X We start the season with a fairway slicing/aeration and verticutting in late March. I heavy traffic areas as needed we will slice those areas to reduce soil compaction for better air and water infiltration. Verticutting is as needed which is most of the time 2-3 times per year.
Procedure 4 DIVOT REPAIR Divots in the fairways are the responsibility of the golfers.
X Some areas of the fairways it would be nice if sand was on the carts for the golfers to help fill the divots. When we have a chance some hole need attention with hand filling divots such as 18 150-80 yards, 17,10, 7 lay up area 100-150 yards,3 near 100 yards. Another help would be if the course marshals could help fill divots on slower days.
Procedure 5 LEAF AND DEBRIS REMOVAL Any large debris like tree limbs are picked up prior to mowing. Leaves and clippings are blown on an as needed basis.
X Our daily task of detail limbs, leafs, and other debris are cleaned off the fairways.
Procedure 6 FERTILITY
138
As with the tees, our goal is to get 3-4 lbs of N on the fairways throughout the growing season, depending on how much rain we get. Spring green up application will be a pound of N in the form of Polyon. Subsequent applications of N will be in the form of liquids in conjunction with our growth regulator applications.
X The science of soil testing saving dollars on using the right fertility. Lbs. of N on the fairway are based on the soil test, and clipping yields. Growth regulators on fairways is a tool I prefer to use only if needed.
Procedure 7 PLANT PROTECTANTS/WEED AND INSECT CONTROL We Primo in the summer months to reduce clipping yield and increase turf density. Weeds are controlled through our pre-emerge program in the spring. The only weed really that isn’t controlled by the program is sedge which is posted out as it shows up. Any other breakthrough that may occur is also treated accordingly. In 2016, all fairways will be included in our preventative mole cricket application.
X Let me start with explaining what primo is. This is a growth regulator. Again growth regulators on fairways is a tool I prefer to use only if needed. You can manage clipping yield with the proper application of fertility using the science of soil testing saving dollars on the cost of growth regulators.
We have a pre-emergent plan in place and if any weeds breakthrough we have a spot treatment plan in place as well. We also have a program for fire ants and grub control. With good grub control it helps us to minimize feral hog damage.
Procedure 8 LABORATORY TESTS Samples will be taken once per year. X
Procedure 9 SYRINGING/HAND WATERING/OVERHEAD WATERING No handwatering is done in fairways. If any areas show signs of wilt throughout the year, the overheads are turned on. We have Toro E- Osmac which gives us relatively precise control of heads. All other irrigation is done as scheduled by the Superintendent or Assistant. Individual heads are adjusted up or down to compensate for soil makeup.
X We have a very hilly course and some of the fairway areas need some hand watering to make it during high summer temps.
Procedure 10 RAIN
139
As with tees, the biggest issues we have from rain are from the washed up chaff that pile up around drains and in wind rows after a hard down pour. We drag the piles and blow them clean when they dry out. The golf course drains well and only have 4 holes that typically stay CPO for a day after the rain stops.
X We have rain clean up after a rain event of 1.5” and up. Most of the rain clean up is done with the buffalo blower. We have leaves, chaff, and trash from the surrounding area flow onto the course that require us to clean up. Up to 3” of rain the back 9 is not passable by cart and has to be closed until the creek waters return to normal on #10,17,13 to allow play.
Area 4 ROUGHS Objective The objective for the rough at Crystal Falls is to
provide a fair yet challenging shot if a golfer misses the fairway or green. It should cause, on average, a ½ stroke penalty…meaning that the golfer should have a shot at the green if he/she finds the rough.
X This has been our standard for all the years of my tenure here.
Goals 1. Keep established definition from fairway torough throughout the year
X In drought years it may not be possible.
2. Minimize wear patterns along cart pathsedges throughout golf course
X With good cart traffic control with signage, and ropes this can happen.
3. Eliminate weed population X Always a work in progress. 4. Install drainage where necessary X We have not installed drainage. Not in budget.
Procedure 1 MOWING AND TRIM WORK a. Height – Mowing height fluctuates
throughout the year with as low as 2inches in the spring to 2 1/2 inches inthe fall and winter. Summer height istypically 2 inches.
b. Frequency - Right now we are able to get 18holes mowed a week.
X
Procedure 2 SCOUTING Along with the superintendent and the Assistant, it is the operator’s responsibility to keep an eye out for anything out of the ordinary.
X Our scouting of the course is always daily and ongoing.
140
Procedure 3 FERTILITY Our goal is to get 2lbs of N on the rough throughout the year. The majority of that comes from our spring application of Polyon. The remainder is from subsequent applications of liquid fertilizer from fertigation.
X We do not have fertigation anymore. Fertility is applied as needed.
Procedure 4 PLANT PROTECTANTS/WEED AND INSECT CONTROL Goose and Crabgrass are controlled throughout the year with our spring pre-emerge program. We will spray the roughs this year with simazine to control the poa annua as well as many winter annuals that may pop up. Any other weeds that show up or break through will be posted out accordingly
X We have a pre-emergent plan in place and if any weeds breakthrough we have a spot treatment plan in place as well. We also have a program for fire ants and grub control. With good grub control it helps us to minimize feral hog damage.
Procedure 5 LABORATORY TESTS No testing will be done unless an issue arises that needs to be addressed.
X
Procedure 6 LEAF AND DEBRIS REMOVAL Any large debris is removed before mowing. All other debris is mulched up with the rough mower and then clipping are scattered/blown off.
X This has been our standard for all the years of my tenure here.
Procedure 7 CORE AERATION Roughs are not aerified with the only exception being compacted traffic areas will be sliced.
X Core aeration of the roughs is not possible with the subsurface rock we have. Only slicing is what we do when needed for aerification of roughs.
Procedure 8 SYRINGING/HANDWATERING/OVERHEAD WATERING No hand watering is done in the rough. If any hotspots show up, they are hit with overhead irrigation. All other watering is done at night as scheduled by the Superintendent or Assistant.
X We have a very hilly course and some of the rough areas need some hand watering to make it during high summer temps. With greens, tees, fairways in this order are taken care of 1st.
Area 5 SKIPPED IN BOOK Area 6 CLUBHOUSE GROUNDS/ENTRANCE ROAD/PARKING
LOT Objective Clubhouse grounds are the first area our guest
judges us on as they enter our properties. They deserve as much care as any other part of the golf
X
141
course. First impressions are everything. The Bermuda grass grounds are maintained year round.
Goals 1. Develop and implement a schedule forproper time allotment for pesticide controlon Bermuda grass
X
2. Grow a stronger, healthier stand of turfthrough weed eradication and nutrition.
X
Procedure 1 DEBRIS REMOVAL FREQUENCY Clubhouse grounds are checked and cleaned daily. X
Procedure 2 MOWING FREQUENCY Grounds are mowed once a week during the growing season and as needed during the winter to maintain a neat appearance.
X
Procedure 3 PLANTING PLAN/FREQUENCY Annuals are changed out two times a year. X We do not plant annuals. Our shrubs and plants are Texas
hardy and deer resistant. Procedure 4 OVERALL DETAIL
i. Beds – Beds are cleaned as part of theroutine maintenance. Weeds are treated bothchemically and hand pulled. Edges are definedwith stick edgers and scuffle hoes if needed.ii. Grass areas – Grass areas are mowed once a
week year at 2” with a rotary mulchingmower.
iii. Tree pruning – Shrubs and trees are prunedas needed to maintain the cleanappearance.
iv. Cart staging area – The staging area isdirectly beside the entrance to the Pro shopwhich is very convenient. It is checked dailyby maintenance and cart staff and keptclean to ensure a positive experience forour guests.
X
Procedure 5 SIGNAGE The signage around the clubhouse is kept as clean as possible. We check them daily as we go through the
X
142
area and detail them as we detail the course throughout year.
Area 7 ON-COURSE-LANDSCAPING Objective The landscaping on the course can be broken down
into two main areas…natural and ornamental. Both are maintained year round. All the landscaping plays a role in the overall flow of the course.
X On holes #1,5,9,16,18 we have some landscaping.
Goals 1. Maintain beds to minimize the intrusion ofunwanted plant material
X
2. Maintain natural areas free of undesirableplant material.
X
2. Explore the option of defining out of playareas with stacked rock walls.
X
Procedure 1 PRUNING All ornamental beds and shrub lines are pruned as needed throughout the year to maintain clean and defined lines. Trees/plants that border paths are edged periodically to keep the paths clear for traffic.
X
Procedure 2 WEEDING Beds are kept clean with a combination of chemical applications and by hand where necessary. All of the beds are sprayed over the top in the summer months. In the winter a pre-emergent will be applied.
X
Procedure 3 MULCHING We touch up the tee sign beds year round with mulch and around the course, beds are kept free of weeds and beds closest to the range and putting green get pine straw once a year.
X
Procedure 4 LEAF AND DEBRIS REMOVAL Any debris is picked up throughout the year as needed. . Any other debris (cigarette butts, broken tees.) are picked up by the setup and course detail employees as they go through the course.
X
Procedure 5 SYRINGING/HANDWATERING/OVERHEAD
143
WATERING Hand watering is used to establish new plantings around property. Once the plant is established, than they rely on rain and overhead watering from our irrigation.
X
Area 8 SKIPPED IN BOOK Area 9 GOLF COURSE ACCESSORIES Objective All golf course accessories should ultimately add to
the golfer’s experience. Too many can be unsightly and too little can be frustrating to a guest who has to go out of his way to find something. There should be a balance to fit their needs.
X This has been our standard for all the years of my tenure here.
Goals 1. Maintain neat and organized appearance andpresentation with all golf course accessories
X This has been our standard for all the years of my tenure here.
Procedure 1 CLEANLINESS/MAINTENANCE/REMOVAL AND REPLACEMENT All accessories are checked daily by the employee assigned to course set up. Any item that is broken or in disrepair is removed from the course and replaced with a backup.
X This has been our standard for all the years of my tenure here.
Procedure 2 COURSE MARKING ITEMS AND UPKEEP Course markings are checked daily by staff and replaced as necessary. We repaint hazard stakes as long as they are in good shape and replace them as they wear out.
X This has been our standard for all the years of my tenure here.
Procedure 3 POSTS AND ROPE/TRAFFIC CONTROL MANAGEMENT We use ropes to control traffic around the course. They are checked daily by our setup personnel and moved accordingly. Cart path only is alternated between 4 holes if needed during drought conditions or winter months limited with growth.
X This has been our standard for all the years of my tenure here.
144
Area 10 IRRIGATION Objective The objective with the irrigation at Crystal Falls is the
same as any other golf course…To supplement Mother Nature during deficiencies in rainfall.
X Yes irrigation is to supplement Mother Nature, yet Crystal Falls is NOT just any other golf course. Hills, subsurface soil areas are a challenge and if you treat it like any other golf course you will fail in keeping it green.
Goals 1. Monitor soil moisture levels to keep theprofile on the “dry” side.
X This has been our standard for all the years of my tenure here. We have been without the correct amount of irrigation water needed to keep the fairways and roughs watered correctly until last year we now are on effluent irrigation. This has changed Crystal Falls golf course forever for the better.
2. Adjust percentages on all heads to better suitthe soil makeup.
X This has been our standard for all the years of my tenure here.
Procedure 1 PUMP STATION SHUT DOWN/START-UP TIMING X It is automatic Procedure 2 IRRIGATION LINE SHUT DOWN/START-UP TIMING X It is automatic Procedure 3 IRRIGATION AUDIT SCHEDULE X We audit irrigation bi-monthly
Visual inspections are done daily by the Superintendent and Assistant as we travel the course. ID’s like wet paths, standing water, and unusual dew or dry patterns are good tells. A minimum of 4 full system inspections are completed year.
X This has been our standard for all the years of my tenure here.
Procedure 4 HEAD/VALVE BOX EDGING FREQUENCY We strive to get heads edged 6 times per year. We have found that the more they are edged, the fewer problems arise.
X
Procedure 5 PUMP HOUSE MAINTENANCE The pump house is kept clean as needed. We have a certified contractor service the pumps once a year. We check the pumps weekly to make sure all cooling systems are working and to make sure there is nothing out of the ordinary.
X
Procedure 6 CENTRAL SCHEDULING/PROGRAMMING PHILOSOPHY As stated in the Objective…our goal is to provide the X
145
appropriate amount of irrigation as efficiently as possible to provide the best conditions for growing turfgrass. We have followed our company’s lead and created separate programs for different parts of the course to enable us to be as efficient as possible when irrigating. Deep and Infrequent when possible, syringing only when necessary.
Procedure 8 HANDWATERING/OVERHEADWATERING/SYRINGING PHILOSOPHY Water is critical for the health of the turf. All measures are calculated to ensure proper efficacy is achieved through our Irrigation system. Irrigation heads are turned down or up to compensate for that specific area. Proper run times are essential for sound management practices. Hand watering is done whenever needed to specifically target the area in need.
X This has been our standard for all the years of my tenure here.
Area 11 EQUIPMENT Objective The equipment at Crystal Falls, like any other golf
course, is just as important as the employees who operate them. The objective for us is to maintain a fleet with as little down time and best quality as possible.
X This has been our standard for all the years of my tenure here.
Goals 1. Have all employees trained and efficientoperators of all equipment
X This has been our standard for all the years of my tenure here.
2. Maintain a log of employee training X 3. Stay at or under budget in equipment repair
and maintenanceRepairing equipment and budget is a challenge. Some times unforeseen events happen to equipment and the cost of repairs bend the budget.
Procedure 1 PREVENTATIVE MAINTENANCE AND REPAIR SCHEDULE Inventory and hours of all the equipment are imputed into our system and service schedules are created based off manufactures recommendations and/or needs as determined by our mechanic.
X
Procedure 2 EQUIPMENT TRACKING
146
a. Preventative Maintenance and RepairTracking – As PM and repairs are completed, they are noted. Copies of invoices are made and supplied to the mechanic periodically to be imputed into the system to track expenses for individually equipment pieces.
X
b. Equipment Replacement Schedule – Wehave come up with an equipment replacement schedule.
X We have always had an equipment replacement/purchase/lease plan.
c. Operator Training – Operators are trained bythe Superintendent, Assistant, Mechanic and foreman on every piece of equipment before going out into the field. They first watch a video provided by the manufacturer, then are given a prestart education by our mechanic and then are trained in operating and procedures. We are putting together an equipment sign off book to keep on file.
X
Procedure 3 MECHANIC CONTINUING EDUCATION We host an education for our local Golf Course Equipment Technician Association every year sponsored by Toro. We encourage and support education whenever possible.
X Equipment manager attends continuing education meetings.
Area 12 MAINTENANCE SHOP Objective The maintenance shop is our house. We understand
that it all starts here...safety, support, and organization. The course will mirror how we are at home.
X
Goals 1. Continue the use of an end of day shopcleanup to be completed weekly
X
2. Maintain around the outside of the shop toinclude the existing landscaping
X
Procedure 1 CONTENTS IN STORED BUILDING All equipment stored inside has designated areas although not for individual pieces…types of
X This has been our standard for all the years of my tenure here.
147
machines only. Procedure 2 CONTENTS STORED OUTSIDE OF BUILDING
Here again, all equipment has a designated area to be kept, just not specific for each piece. All other equipment is kept outside. The aerifiers, grounds masters, push mowers, blower, and rough units, except the trim units, are stored outside under the covered lean-tos. The tractor/loader is exposed to the elements as there is no place to keep it. Our spray rigs are kept under the lean-to beside the chemical room.
X This has been our standard for all the years of my tenure here.
Procedure 3 SHOP SETUP a. Safety Equip – All safety items necessary for
daily work is provided to the operators. Earprotection, sunscreen, insect repellent, andback braces are kept on a shelving unit bythe greens mowers and eye protection iskept in the mechanic’s area.
X
b. Small/Hand Tools – Hand tools are keptupstairs in the shop mezzanine and areseparated by type along the wall. This is thebiggest place to keep the tools out of the wayof daily traffic.
X
c. Employee Area –has several lockers, tablesand chairs, and a small kitchen with a fridge,sink, microwave, cabinets, and adishwasher. Currently cleanup in all areas iscompleted by all staff in the afternoons.
X
v. Signage – Proper signage is postedthroughout the shop confines. Everythingincluding bathrooms, fire extinguishers,exits, load capacity, and safety placards.Emergency system signs/lights are checkedmonthly by the superintendent to insurethat they are all in working order.
X
148
Procedure 4 OFFICE AREAS a. Computer(s) and Office Machines - We have
computer systems as well as aprinter/business center.
X
b. Who Uses and How Many Office/Desks –We have two offices at golfmaintenance…Superintendent,Assistant/Forman and EquipmentTechnician. There is a desk for eachemployee in the offices.
X
Procedure 5 SAFETY a. Spill containment – We keep a proper
containment kit consisting of a bucket, soil,chemical resistant glove, and eye where inthe shop. Any major spills will be handled bythe proper authority.
X
b. Call List – All employee phone numbers arekept up to date and are provided to allemployees. In the event of an emergency,the club sets up and “EmergencyInformation Line”. All maintenanceemployees have phone numbers for theSuperintendent and the Assistant ifneeded.
X
c. Hospital/Medical Center Directions –In theevent of an emergency, 911 is called andwe wait for the authorities.
X
Area 13 STAFFING Objective Staffing is the most important part of any
organization. Good people make all the difference. As with many other courses we take pride in our staff at Crystal Falls. They are what make us a destination for so many golfers in the area.
X This has been our standard for all the years of my tenure here.
Goals 1. Train all staff to identify problems andcommunicate
X This has been our standard for all the years of my tenure here.
149
2. Have entire staff cross trained on allequipment and procedures where possible
X This has been our standard for all the years of my tenure here.
Procedure 1 TRAINING Training is done by the Superintendent, Assistant, or Foreman. Additional training is provided by the Equipment Tech when necessary.
X This has been our standard for all the years of my tenure here.
Procedure 2 SCHEDULING We try to remain flexible with all employees, part-time especially, but they understand that we do have a business to run. Scheduling is determined by the Superintendent and the Assistant depending on what needs to be done in the field and what projects are being worked on.
X This has been our standard for all the years of my tenure here.
Procedure 3 HIRING AND FIRING PROCEDURE All hiring and firing is handled by the Superintendent. We have had good success recently with ads posted for free on the internet…Craigslist specifically. Interviews are performed for all positions.
X
Procedure 4 COACHING PROCEDURE We take every opportunity to help the employee improve and work on any issue they may be having before finally letting them go. The coaching and observation forms provide a great way to help set expectations and goals for determining how the employee is coming along.
X This has been our standard for all the years of my tenure here. We also have written guideline to set the standard of operation and staff expectations.
Area 14 RECORD KEEPING Objective Positive record keeping is the best way for collecting
valuable data for all aspects of golf course maintenance. We have utilized this for chemical and fertilization for many years and are now starting to use it to better track our expenses and equipment repair.
X This has been our standard for all the years of my tenure here.
Goals 1. Utilize existing tracking tools to ensure X
150
proper documentation in all areas. 2. Stay up to date with data input for easier
access to information.X
Procedure 1 FERT/CHEM Every application, both fert and chem, is documented and kept in a specific binder in the office (IPM and Fert for each year). Maps are created as needed for preventative applications.
XX This has been our standard for all the years of my tenure here.
Procedure 2 EQUIPMENT/GOLF CART REPAIR Equipment and golf cart repairs are kept in the computer on the software programs.
Procedure 3 BUDGET TRACKING –LABOR/EXPENSES As invoices are coded they are copied and filed for specific months and vendors. They are then immediately entered into the budget tracker.
X
Procedure 4 WATER USE AND TESTING We are governed by the Crystal Falls River Water Management District and report our usage (well and lake) to them twice a year through the En-50 water usage forms. We have our water tested once a year in the spring for pH, hardness, bicarbonates, and any other elemental readings.
X We have always tested our irrigation water every year.
Procedure 5 HIRING AND DISCIPLINARY ACTION All documentation of employees are passed along to our GM kept in their file at the clubhouse. Any form requiring the signature of our employees is put into their personnel file.
X HR gets all the documentation.
Procedure 6 FUEL LOGS Fuel is recorded after each use. Logged by each employee specific to their piece of equipment.
Procedure 7 WEATHER The only official records we keep on weather are rainfall amounts
X Rainfall spreadsheet kept . This has been our standard for all the years of my tenure here.
Procedure 8 OSHA AND WC FORMS X
151
We have an incident folder we keep in the offices that help us respond to any accidents that come up. Included in that folder are all necessary forms for OSHA and WC. As an event occurs, a file is created for each until they are closed out. We also keep an up to date binder with all the MSDS sheets in it in the break room on the Right to Know Center.
X
Area 15 MANAGEMENT Objective We have always been told that they key to a well-
run organization is in the management’s ability to delegate tasks and responsibility successfully. We take pride in our ability to promote from within, and one of the reasons we can is because of the responsibility given to those around us who show that they want it and can handle it.
X This has been our standard for all the years of my tenure here.
Goals 1. Involve the Assistant in all aspects ofscheduling and budgeting
X This has been our standard for all the years of my tenure here.
2. Post and handout schedules forupcoming months to better forecastwork schedules
X This has been our standard for all the years of my tenure here.
3. Meet with employees individually tomonitor advancement and or concerns
X This has been our standard for all the years of my tenure here.
Procedure 1 CREATION AND LISTS OF VARIOUS SCHEDULES Projects are scheduled yearly and presented to the staff of the club yearly. Dates of Aerifications are usually locked in by November of the previous year.
X This has been our standard for all the years of my tenure here.
Procedure 2 DELEGATION CHAIN CHART/FOLLOW UP CHAIN CHART No chart like this exist here. We have an open door policy amongst the crew. They know that their direct report is to the Assistant Superintendent and then to the Superintendent. I respect my Assistants ability to handle the crew and do not jump levels of communication without first talking with him.
X We do not have a “chart” because it is known by all staff and it is verbally communicated to ALL the staff. This has been our standard for all the years of my tenure here.
152
Procedure 3 SAFETY MEETINGS We strive to have a least 5 safety meeting a year. Winter is a great time for us to have these as we wait for the frost delay. They consist of many issues including but not limited to chainsaw safety, heat exhaustion, Right to Know, and Fire Extinguisher usage. We always have a summer safety meeting regarding hurricane preparation for the course.
X We don’t strive to have 5. We DO have at minimum 6 safety meetings a year.
Procedure 4 COURSE SAFETY MONITORING Safety is our number one concern at Crystal Falls as with any other course. We ask all of our employees to keep us notified of anything they see throughout the day that they feel is a safety issue. We have safety counsel meetings once a month with management to discuss issues around the property. Any hazards are taken care of immediately.
X
Area 16 COMMUNICATION/INFORMING Objective The relationship between Golf Maintenance and
Club operations is initiated daily to better help each other through short and long term goals…Provide our guests with a fun and enjoyable golf experience. Communication is key in order to perform efficiently and with as little effect to our guests as possible.
X This has been our standard for all the years of my tenure here.
Goals 1. Over Communicate X This has been our standard for all the years of my tenure here. Procedure 1 TO MAINTENANCE STAFF
Daily assignments are written on the assignment board in the mornings prior to staff arriving. We have a quick meeting to discuss any specifics or anything out of the ordinary.
X This has been our standard for all the years of my tenure here.
153
Procedure 2 TO CLUBHOUSE STAFF Either the Superintendent or the Assistant checks with the pro shop every morning to double check pin rotation, course conditions, and tee times.
X
Procedure 3 TO GUESTS Any information that needs to be given to our guests first goes to the pro shop and they pass it along either as guests check in or by the Starter as he goes over course information.
X
154
Billy Casper Crystal Falls Golf Course Recommendations
Initiative Item(s) Completed Not Completed
Notes/Adjustments
1. LOCAL MARKET OVERVIEW Objective BCG recommends a pricing model that positions CFGC more in-
line with the Public-Value segment, and aggressively adjusts price to fill underutilized times.
Prices adjusted the BCG recommendations. After further review, we determined that we were losing money and raised prices to a more profitable level. This was discussed with Kent in a previous meeting.
2. MARKETING Objective 1. All marketing efforts should be tracked for
effectiveness. If the results of a marketing programcannot be tracked, do not do it!
2. Always include an offer to encourage a "Call to Action"and stress the "Value of Crystal Falls"
3. Drive golfers to website to build database anddetermine areas to focus future marketing efforts
4. Use tee sheet data to identify the days and times ofday requiring marketing attention
5. Always include expiration date6. Evaluate effectiveness and return on investment
("ROI")7. Build separate databases for trade shows, golfers and
members. Actively promote to these databases
Standard Operating Procedure.
Website has always been marketing tool. Over 10,000 in our data base.
Every week tee sheet is looked at and adjustments are made to try and fill. ROI is always looked at. We do not go to trade shows due to budget .Members are separate.
3. INCREASE ROUNDS 1. Post offers on web-site to encourage traffic to website
and ability to get guest contact2. Offer a reward for the consumer giving you their
information, a $5 "bounce back" or thank you couponthat they can redeem with their next round of golf.
Done monthly if not weekly.
155
3. Discontinue all awareness ads unless tied to direct offerthat requires trackable response from guest.
4. Create synergy between all marketing tactics and trackthe effectiveness of all of the marketing tactics. Annewspaper promotion intended to increase roundsshould be combined with an on-site offer to increaseusage and should include an end date.
5. Market specifically to the membership to increaseusage of facility during slower periods. This can beaccomplished by scheduling member only events andguest of member discounts.
6. Offer a Frequent Players Card for $69 that wouldinclude a round of golf and a $5 discount on all roundsfor a twelve month period. This should promoteincreased play by those playing more than 3x per year,but not playing enough to purchase a membership.
7. Offer a Rewards Card to all golfers on carts, greens andrange fees to encourage usage and provide an easy
mechanism to track playing habits.8. Develop and implement a comprehensive sales and
marketing program including targeted print advertising;guest data capture, direct mail and broadcast e-mail;direct selling to local hotels, businesses and chambers;and offering and promoting off-peak specials
9. Offer Programs to promote data capture. .10. Create additional player development programs to
attract new players. .11. Aggressively promote and solicit golf outings including
both large and small groups. Target existing members,local businesses, charitable organizations, churches, andfraternal organizations.
.12. lncentivize staff members to capture guest-data. 13. Provide an annual incentive to management based on
facility revenue and profitability. 14. Implement tee sheet "Yield Management" in an effort
to maximize day part rates.
Always use tractable ads.
We do have a frequent player program.
Tried rewards card. Did not work with our guests.
We do some of these but others we have time issue with amount of staff.
4. OPERATIONS
156
Objective 1. During our visits we found the golf shop staff to be focused on processing guests and directing them to their cart. The number of golf shop staff members appeared to be excessive for the amount of business. BCG did not observe any outbound sales, marketing initiatives, or up-selling of the guest at the counter by the golf staff.
This is misleading. At the time of the evaluation, there were extra staff members to assist with any information required by BCG. This was not our normal staff level. On that particular day there was only 4 staff members actually on the clock. One was full time 2 were part time and one was salary.
2. During the 'check-in process' the cashier is not promptedto up-sell or enter any player information that couldprove useful from a marketing perspective: mailingaddress, e-mail address, phone number, age, etc.
Not sure what was observed but this is false. Staff does a great job at up-selling and gathering info from guests.
3. CFGC would benefit from stocking lower pricedmerchandise with higher margins. Brands such as GregNorman, Bermuda Sands, and Nike would provide
suitable merchandise at the appropriate cost.
These vendors are not lower priced and they are available in “big box” stores. By adding these brands, we would increase the competition against our operation.
Cashiers and Cash Handling Procedures 1. A variance report should be run by managers each day.2. Always blind count all registers.3. Limit access to register drawers to one cashier per
drawer.4. Working from an open drawer is strictly prohibited.5. POS register report and accounts should tie to financial
statements
Standard Operating Procedure. Multiple cashiers use one drawer. The drawer is always checked at opening and closing. Cash deposit is check by two separate employees.
FIRST IMPRESSIONS - SCRIPTS Pro Shop Script (Phone Reservation) 1. Answer the phone in a friendly and professional
manner (No more than 3 rings)Standard Operating Procedure
157
2. Request the guests email address to send a tee timeconfirmation
3. Confirm the time, date, and number of players in theguest's tee time
4. Thank the guest for making a tee time, and offer apositive parting remark
As always been a very important part of operation. When guests call they get a real person to answer and all staff knows the importance of that first contact with our operation.
Pro Shop Script (Check-In) 1. Greet the guest in a friendly and professional manner
(Eye contact and a smile)2. Request the name and email address of the guest and all
playing partners present3. If the guest is not already a card holder, offer the
opportunity to join either a membership or loyaltyprogram
4. Suggest additional items the guest may need to purchase(golf balls, tees, gloves, range balls)
5. Process transaction and provide the guest with a receipt6. Make sure the guest knows where to go next, and offer a
positive parting remark
Standard Operating Procedure
Staff is great with our guests. Service is probably the facilities #1 asset. We treat people very well.
Starter Script 1. Greet the guest in a friendly and professional manner
(Eye contact and a smile)2. Collect receipt to confirm check-in, record cart number3. Ask if the guest has played at the golf course before4. Explain any information pertaining to the course that day
a. Cart rulesb. Pin positionsc. Beverage cart hoursd. On-course restroom locationse. Local knowledge
5. Explain the expected pace of play, and the presence ofthe ranger
6. Thank the guest for their business, offer a positive partingremark, and direct them to the first tee
Standard Operating Procedure All of these are being done and always has been done.
Staff is very informative.
Golf Outing and Tournament Sales Policies
158
1. CFGC is at a disadvantage because it does not offer an area for all players to gather after the outing. BCG recommends investing in fully roofing the patio area which could be utilized for outings after the event
2. CFGC should generate an average of 3,000 golf outingrounds which can yield revenue results of $200,000 ormore per year.
3. The financial performance of the facility could beimproved upon by aggressively pricing outings on slowerdays and time frames to increase outing sales andrevenue.
Hoping to see our deck covered in the future
Culture/ Critical Eye Management team working as cart attendants as needed, but, a better usage of time would be outbound tournament sales efforts.
With a smaller staff size, we are often required to cover lapses in shifts to maintain efficiency. We are cross-trained to manage different areas of the operation as needed.
Assessment and Recommendations • Golf shop and outside operations schedules should be
created showing total labor dollars to match monthlybudget numbers
• Inventory should be taken on a monthly basis by the golfStaff
• Year-end reporting of golf shop sales should reconcile tothe financial statements
• Green Fee discounts and promotions should be trackedper each offer
• Rounds played by each promotion should be specificallydesignated and tracked
• Transactions cannot occur with open cash drawers• Every guest should be entered into both the tee sheet and
POS System• All team members need to take ownership of facility – not
select few
Standard Operating Procedure.
5. PRICING, RATES & YIELD MANAGEMENT
159
Objective Memberships The lack of participation in the membership offerings at CFGC is cause for concern.
Membership prices have been reduced.
POS Systems and Third Party Tee Time Wholesalers 1. As CFGC becomes more aggressive with online pricing
discounts to capture market share, it will be necessary tohave a tee sheet that can communicate with third partytee time vendors such as GolfNow or other.
2. At the writing of this report, the only tee times availablefor booking through the CFGC website are pre-paid tradetimes. In 2015, only ten emails were sent to the CFGCdatabase. BCG recommends 2·4 emails per month be sentto segmented groups of the database with a specific callto action.
3. BCG recommends restructuring the third partyagreements with the two largest vendors - GolfNow andTeeoff.com. CFGC should control the base price for around of golf and move away from the trade model withzero pricing control, essentially, the wholesalers are paida commission based on the total volume of tee timessold. This incentivizes third party vendors to sell as manytee times as possible - at the highest rate possible.
Misleading. The entire tee sheet was available for online booking through Golf18Network. Two of the available tee times were trade times. We ended our agreement with GolfNow because we were seeing mostly trade rounds booked. Very few revenue rounds were booked through this medium. GolfNow does not promote our image; they promote their own image. CFGC isn’t retaining players, GolfNow is. Emails were discussed in a previous meeting with Kent and Tom.
Assessment and Recommendations • Need new POS system in F&B and Golf Shop – BCG
utilizesmultiple vendors (EZ Links, G1 - GolfNow, IBS) due tothe integration of the tee sheet with third partyvendors
• Data capture becomes mandatory for everytransaction
• Every round of golf should be entered into both the teesheet and POS System for accurate reporting andtracking
• Structure relationships with third party tee timevendors to leverage eyeballs and increase rounds
Standard Operating Procedure. It is unnecessary to procure new POS software. Pro shop-keeper handles all the functions necessary without added expense.
160
6. FOOD & BEVERAGE OPERATIONS Objective • Due to the size and location, continue a similar
operation moving forward. However, refrigeration andfreezer space is very limited and could not support amore robust menu offering.
• Cost of Goods Sold ("COGS") for the F&B operation isvery good.
At the Golf Grille, the following were in place: 1. Establishment of Par inventory values for all key
products2. Bi-monthly menu cost analysis - inventory costs are
fluid -3. Comparison shopping from vendors on a monthly
basis - guarantee you are getting the best pricingon a consistent basis
4. Removal of menu items with minimal sell throughor poor margins
5. Track all Waste6. Enforce policies to make sure all items are rung
through the register for more accurate counts7. Enforce policies for employee meals - Track cost of
employee meals8. Lock up all product - in place9. Do not allow for pay-outs from register
• Check in and out all Beverage Cart items – noreconciliation – currently not happening
All these points have been done in past and will continue to be done.
Food & Beverage Operational Tactics 1. Continue a scaled back menu to limited
offerings2. Focus F&B effort to core business which is
serving golfers, outings and lunch crowd.3. Implement Beverage cart inventory control
system. Cart girl should not be permitted tocheck in her own product. This eliminates therisk of beverage cart attendant selling her ownproducts.
4. Operate Golf shop and F&B with one individual
Very seldom is there more than one person in the grill. We do try and have at least 2 staff members during busy times. The grill has always been short on staff and is operated in a very lean manner. Beverage cart is and has always been monitored.
161
during slow time to adjust staffing of F&B to busy times only
Assessments and Recommendations • Review staffing model for entire clubhouse to
implement cross training and coverage thus reducingoverhead
• Review Labor model to determine if grille operationjustifies a full time year round manager.
• Operate the beverage cart with more frequencydepending on the amount of play (at least 100rounds) beverage cart should be profitable operation.
This operation has always operated with limited staff in all areas. Since this evaluation staff ahs been reduced event further. A full tie F/B is needed. That is the only full time staff member in the grill.
7. CAPITAL IMPROVEMENTS RECOMMENDATIONS Clubhouse: Assuming the desire to do more outing rounds, Construct an outing pavilion for large groups or in lieu of constructing a large outing pavilion, construct the extension of a permanent patio overhang, effectively doubling the undercover space and providing adequate space for the majority of the outings. Golf Course: • Create a rock creek bed in front of #6 green• Make the area to the left of the landing area on #14
playable• Address the landing area and level/mound #16• Address the landing area and level/mound #18• Cart paths - continue to fix broken areasEquipment Needed:• Walk behind aerator (Toro 648)• Cart path edger• Pull behind turbine blower
Planned but not started or completed.
8. FINANCIAL ANALYSIS Scenario A - CFGC continues as Status Quo with the City Board providing oversight to operations. Under this Scenario BCG has shown minimal rounds or revenue growth in the operation of CFGC. Scenario B - CFGC implements all pricing, marketing, and revenue growth recommendations. Under this scenario significant rounds and revenue growth with the
162
implementation of industry leading marketing tactics. 9. BEST PRACTICES
Financial Reporting • A CPA should review monthly financials for accuracy• Use GAAP accounting in preparing financials• Utilize bookkeeper to create financials as opposed to
on- site manager. A bad idea for multitude of reasons;proficiency, time usage, accuracy, controls, etc.
• Incorporate detailed chart of accounts to better trackrevenues and expenses
Standard Operating Procedure.
Industry Benchmarks • F&B Operations - 33% Cost of Goods Sold ("COGS"),
33% Labor Burden, 3% to 8% Operational ExpenseBurden dependent on footprint of facility
• Merchandise Sales - 75% COGS and an annual turn rateof 4 to 6 times
• Total Labor Burden of 40%• Benefits Burden of 7% to 10%• Average Dollar per Round ("APR") is about 60% of
highest posted rack rate• Measure APR by day and rounds type to optimize rate
Structure
Merchandise COGS is maintained at 70% with a turnover rate of 2 times for the entire inventory (some categories are higher). This is based on 10+ years of historical data. Maintaining a turn rate of 4-6 times is considered very aggressive even for “big box” retailers. For a smaller retail operation, trying to maintain 4-6 inventory turns is undesirable.
Operations • Trade-outs and barter agreements documented and
evaluated for ROI• Volunteer usage is liability concern from insurance
purposes and potential interaction with guests• Clearly defined roles and responsibilities of staff
members - what are the priorities and focus of keypersonnel
• Deposit Cash nightly/daily• Post signage indicating if "guest does not receive
receipt purchase is free."
Standard Operating Procedure. Volunteers are necessary to keep labor costs down. We ask customers if they would like receipts; receipts are given when requested. All these bullet points have always been done. Manager of this operation
163
• COGS and pricing evaluated monthly• Daily Reconciliation, Daily drawer closing, and Cash
Reconciliation should not be performed by the sameindividual
• Dedicated Men's and Women's Bathroom in clubhouse• Professional Training Program and constantly reinforce
with staff. Ironically, lowest paid employee orvolunteer has the most interaction with the guest
• Mystery Shop SHR and provide guest comment cardsfor feedback
• Create an Annual Business Plan. Golf is a business, nota cottage industry
• Staff always in a logoed, uniform shirt with name tag• Safe bolted to floor• Value your guests time• Pace of Play - visual cues to speed up. Proactively
address and monitor, once it is a problem it is too late
is one that works right alongside all staff members in all areas on almost a daily basis. Staff is daily being shown and reminded of the importance of their job and how important they are to the success of the operation. Lower paid staff members were being told years ago and to this day how important their interaction with our guests is. Cart staff is told that they could be the first and the last person our guests see and how important is for them to leave a positive impression. Once again all of these operation points have and continue to be addressed.
We do understand that this is a business.
Staff members in the past did wear logoed shirts but in order to lower expense we no longer offer logoed shirts to staff. Although the staff that does have logoed shirts from the past do wear them.
Profitability Culture
164
• Revenue generating Managers• lncentivize all staff on profitability of facility
Revenue and how to generate it has been consuming my mind o a daily basis for over 10 years. I think I get it. I also think the staff understands revenue also.
Miscellaneous • Stand for something - Create and maintain integrity of
brand• Leases should be by owner (The City of Leander). If in
third party manager's name, they own leased itemseven though owner is supplying capital
• Large Clubhouses in communities become "whiteelephants." Golf shops are usually overbuilt inclubhouses
Standard Operation Procedure.
Marketing • Look to Data-capture each golfer's information. Each
Unique golfer would be contactable via e-mailand/or snail mail
• Develop Retention Strategies - number of golfers andthe rounds of golf played in the United States arerelatively flat. Revenue growth requires stealingrounds from other courses and growing rounds fromexisting golfers
• Develop Marketing Plan with clear objectives, tacticsand strategies
• Evaluate Return on Investment ("ROI") of eachpromotion, if it is not measurable do not do it
• Improve portals for guests to contact CFGC• Packagers - Wholesalers are very advantageous during
infancy of lifecycle of facility, improved data-capturewill allow for targeted communication withoutwholesalers as "partners", just the opposite currently,which makes no sense.
• Develop “Marketing Revenue Play Book”1. Plan all revenue generating activities in
Marketing is an area that we could see more time spent on. We have done more this past year but more could be done. I think we do our best with the time and the amount of staff. We do a lot with our website and through social media which is the best way in this day and time to promote a golf course and capture data that is useful. We do have a plan it may not be as broad and hit all areas but we do a pretty good job with the tools we have. We do tract all marketing and make sure we have a
165
October of prior year 2. Plan key details of activities
ROI. We do know the importance of marketing. Marketing also cost money. We also do plan ahead for all activities of the operation. .
166
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Additional San Gabriel Park Property
BACKGROUND: The property north and adjacent to the current San Gabriel Park property has become available. Acquisition of this property would be a great addition to the future plans for the park property.
ATTACHMENT: 1. Photos of the available property
PREPARED BY: Mark Tummons, Parks & Recreation Director
167
o County BoundaryAddressStreets
Li WCAD Parcels
Notes
WILLIAMSON COUNTY Potential AdditionaL San Gabriel Park Property
Austin
Legend
0.2 0 0.12 0.2 Miles ,,__,,_, — ,, .._,._, —I
________
•*fl
THIS PMP IS NOT TO BE USED FOR NAVIGATION created: 07/11/2017wGS_1984_webj4orcatoLAuxitiary_Sphere© Latitude Geographics Group Ltd.; Williamson County, Texas 2015 Layout: 8.5 X 11 inches
168
0 200 400
APPROXIMATESCALE IN FEET
LEGENDo IRON ROD POUNDO IRON ROD SET* COTtON SPINDLE FOUND
CONCREtE MONUMENT FOUND
THIS SURVEY WASCOMPLETED WITHOUT THEBENIFIT OF A 11TLECOMMITMENT
A PORTION OF THE SURVEY SHOWNHEREON LIES WITHIN THE LIMITS OF AFLOOD HAZARD AREA OR WITHIN THELIMITS OF THE 100 YEAR FLOOD ASIDENTIFIED BY THE FEDERALEMERGENCY MANAGEMENT AGENCY.FEDERAL INSURANCE ADMINISTRATION,AS SHOWN ON COMMUNITY PANEL NO.484g1co225 ZONE A, DATEDNOVEMBER 2, 1995, FOR WiLLIAMSONCOUNTY, TEXAS AND INCORPORATEDAREAS.
THIS SURVEY SUBSTANTIALLY COMPLIES WiTH THECURRENT TEXAS SOCIETY OF PROFESSIONALSURVEYORS ASSOCIATION STANDARDS ANDSPECIFICATIONS FOR A CATEGORY 18, CONDITION II,STANDARD SURVEY AS DESCRIBED IN THE MANUALOF PRACTICE FOR LAND SURVEYING IN TEXAS, DATEDOCTOBER 20. 2000.
I-so-o1DATE
SURVEY SKETCHBEING 19.758 ACRES OF LAND OUT OF AND A PORTION OFTHAT CERTAIN 43.0 ACRE TRACT OF LAND OUT OF AND APORTION OF THE JOHN B. ROBINSON SURVEY AND THE W. H.MONROE SURVEY, SITUATED IN WiLLIAMSON COUNTY, TEXAS,SAID 43.0 ACRE TRACT OF LAND BEING MORE PARTICULARLYDESCRIBED AS BEING A PORTION OF THAT CERTAIN TRACT OFLAND THAT WAS CONVEYED TO T. T. HAMILTON BY DEED OFRECORD IN VOLUME 119, PAGE 572 OF THE WiLLIAMSONCOUNTY. TEXAS, OFFICIAL PUBLIC RECORDS.
ap.s. ServicesSubdMdona • Toporapli
ConstnjcUon • Commsrclal a
P.O. BOX 850LIBERTY HILL.PH: (512) 5ffFAX: (512) 51
P
TRACT 2
DATE: 1—30DRAWN BY:FILE NAME:
43.0 ACRES
(R=56699’)JUAN:TA MASON
(D=02’27’29”)R3322t15
(T= 121.63’)(L=243.22’)
g W)
L254.O5’ \
\
PROJ. NO.
U’
P.O.B.
19.158 ACRESREMAINDER OF 43.0
ACRESPAGE 288
3t
95 PAGE 286\
2L543 ACRESREMAINDER CF
43.0 ACRESVOL 595 PAOE
288
4’
—,l —Ii\ —
1-—— vzY
__1 g.-”V
\
TRACT 438.24 ACRES
MCGENE CHAUPON595 / 288
SDS
‘ITEVE W. WOMACKREGISTERED PROFESSIONAL SURVEYORNO. 5025, STATE OF TEXAS
Land Surveyors
169
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Cross Connection Control Program
BACKGROUND: In accordance with state requirements, City staff is developing a Cross Connection Control and Backflow Prevention Program that will include recurring (annual) inspections and tests of certain residential backflow prevention assemblies considered potential health hazards. Several neighborhoods with a combination of on-site septic systems and in-ground irrigation systems will be impacted by this program.
ATTACHMENTS: 1. Program Summary2. Draft Notification Letter
PREPARED BY: Pat Womack, Public Works Director
175
CROSS CONNNECTION CONTROL AND BACKFLOW PREVENTION PROGRAM SUMMARY
• Title 30 of the Texas Administrative Code (30 TAC) Chapter 290 prohibits public water systemsfrom connecting to an actual or POTENTIAL contamination hazard without first protecting thepotable water supply.
• TCEQ’s Requirements:1. Cross Connection Control and Backflow Prevention Ordinance2. Plumbing Ordinance, Regulations, or service agreements3. Customer Service Inspections (CSI’s)4. Backflow Protection using appropriate backflow prevention assemblies (BPA’s)5. Routine (annual) testing of BPA’s
• Any hazard must be isolated from the drinking-water supply regardless of when the hazard wasfirst created. There are no grandfather clauses that apply to a cross-connection control andbackflow prevention programs.
• Residential Customers with on-site septic systems:
642 Grand Mesa 158 Falcon Oaks 109 Reagan’s Overlook
78 Ridgmar and Valley View 27 Greatwood 12 Pleasant Hill Estates
1,026 Total Inside City
82 Outside City
• Residential Highlights:1. The TCEQ does not recommend installation of backflow-prevention assemblies (BPA’s) at
ALL service connections.2. Residences that have an actual or potential contamination hazard on-site must use an
appropriate BPA. [30 TAC 290.47(f)].3. Typical residences only require minimal protection such as vacuum breakers on hose bibbs,
air gaps, and irrigation back-flow prevention.4. Residences with irrigation systems AND on-site septic (treatment) systems are considered
health hazards (per TCEQ requirements), require an appropriate backflow preventionassembly, testing upon installation and annual re-testing.
5. Initial tests upon installation are the builder’s responsibility.6. Re-tests (performed by a TCEQ-licensed tester) are the property owner’s responsibility and
must be submitted on-line by the testing company using the BSI program.
176
• Notices:1. BSI mails letters to addresses for the annual testing.2. Residents have 30 days to schedule and submit tests.3. Past due letters are sent after 30 days and allow 15 additional days to submit.4. Failure to submit passing tests could result in City conducting the test, at owner’s expense
and placing cost of test and possibly repairs on the water bill.
• Approximate Annual Test Costs:1. Residential: $60 per test near meter, as high as $75
a. Does not include potential cost of replacement or repairs.b. Does not include retests.
2. Commercial: $75 to test for an interior location3. Restaurants or businesses with multiple testable assemblies: $50 - $754. BSI filing fee to submit test results: $12.95 per device.
• See attached residential notice letter.
177
City of Leander Cross-Connection Control Program P.O. Box 246 Worth, IL
2012 Spyglass Hill Attn: John Smith Leander, TX 12345 Your Customer Confirmation Number:
0A00-A0AA August 31, 2017 Use this # to see when your reports have
been submitted at www.bsionlinetracking.com
RE: Backflow Assembly Test Due at 2012 Spyglass Hill Leander, TX 12345
Dear Water Customer,
The State of Texas requires that backflow prevention assemblies be installed on all health-hazard service connections in an effort to keep our water supply safe. Residences with irrigation systems AND on-site septic (treatment) systems are considered a potential health-hazard connection; therefore, these assemblies must be tested and certified annually to ensure they are working properly. According to the state requirements in Title 30 of the Texas Administrative Code, Chapter 290, the City of Leander has partnered with BSI Online to implement and administer the backflow testing program. Our records show the following backflow assembly(ies) at your property, which are due to be tested by September 30, 2017.
Size Manufacturer Model Serial Number Hazard Location
1” Febco 860 H07692 Irrigation NE corner
You are responsible for contacting a licensed backflow tester to perform the annual test and certification of the backflow assembly(ies) listed above (BSI or City employees do not test backflow assemblies). Please provide the CCN listed in the top right corner of this letter to your backflow tester, as they will need this number to properly file your backflow test reports via BSI Online. You may also use this CCN at www.bsionlinetracking.com to verify when your backflow test has been filed, locate a list of testers in your area, or to simply learn more about backflow assembly testing. Please contact BSI via e-mail (bsionline@backflow.com) or phone (800-414-4990) if you have any questions, or you may contact the City of Leander Public Works Department at 572-259-2640. Thank you for your cooperation and for helping to protect our water supply.
Sincerely,
Christine Walsh, Vice President Agent for the City of Leander
For your convenience, your last testing company of record (if available) is listed below:
John’s Plumbing
(512) 555-4568
178
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: TOD Update
BACKGROUND: A lot of activity is underway in the TOD. This item is intended to provide an update to Council on the current status of development projects, TIRZ reimbursement requests and potential public/private partnership opportunities on new projects.
ATTACHMENT: 1. Overall TOD map with current and proposed projects2. AREA Leander 1 proposed layout3. TIRZ Project Plan including most recent requests
PREPARED BY: Tom Yantis, Assistant City Manager
179
C O L L A B O R AT I V E 5
N: 3.34 AC N: 3.27 AC N: 3.73 AC N: 7.39 AC
N: 8.63 AC
park / plaza: 0.23ac
park / plaza: 0.28ac
park / plaza: 0.42ac
park / plaza: 1.88ac
N: 9.13 AC
N: 5.68 AC
N: 5.1 AC
N: 7.03 AC
Proposed Network Layout
Legend
Existing & Proposed Roads
Proposed Multimodal (Bike/Pedestrian/Auto) Roads
Proposed Drainage Route
Proposed Open Space (park and/or plaza)
184
C O L L A B O R AT I V E 6
0 300100 200
Proposed Network Layout
Legend
Existing & Proposed Roads
Mel
Mat
his B
lvd
Mai
n St
.
Proposed Drainage Route
Proposed Open Space (park and/or plaza)
BLOCK A BLOCK B BLOCK C BLOCK D
BLOCK F
BLOCK E
BLOCK G
BLOCK H
BLOCK I
692’
515’
570’
990’
465’
465’ 690’
800’
902’
577’
956’
384’390’
384’ 385’
465’
484’
484’
484’
592’
391’
457’
484’
343’
683’
417’
590’
park / plaza: 0.23acpark / plaza: 0.28ac
PLAZA / SQUARE = 1.88ac
plaza / park = 0.42ac
185
C O L L A B O R AT I V E 7
0 300100 200
Speculative Land Use & Bldg Blocks
Legend
OFFICE
MEDICAL OFFICE
RESIDENTIAL: “GURBAN”
RESIDENTIAL: TOWNHOMES OR CONDOS
RESIDENTIAL: “WRAP” APARTMENTS
PARKING GARAGE
RETAIL / COMMERCIAL
HOTEL
~1.48ac @ 15 u/ac
~100Ksf office4:1000 pkg ratio
~200Ksf office4:1000 pkg ratio
~200Ksf office4:1000 pkg ratio
~350-380 apt units ~100 unit hotel
~50Ksf surgery center5:1000 pkg ratio (pkg shared
with grocery store)
~30Ksf grocery store
~10Ksfrestaurant
~9.1 ac @ 30u/ac~7ac @ 30u/ac
~350-400 apt units
~500 apt units
186
C O L L A B O R AT I V E 8
0 300100 200
Land Uses - Option 2 (per block)
Legend
OFFICE
RESIDENTIAL: “GURBAN”
RESIDENTIAL: TOWNHOMES OR CONDOS
RESIDENTIAL: “WRAP” APARTMENTS
PARKING GARAGE
RETAIL
HOTEL
~1.48ac @ 15 u/ac
~100Ksf office4:1000 pkg ratio
~350 apt units ~350 apt units ~220Ksf office4:1000 pkg ratio
~100 unit hotel
~420Ksf office4:1000 pkg ratio
~10Ksfrestaurant
~9.1 ac @ 30u/ac~350Ksf office4:1000 pkg ratio
~5.1ac @ 15u/ac
~5.6ac @ 38u/ac(one level deck)
187
Leander TIRZ Project Plan
Leander TIRZ Project Plan (Rev. 11/16/2016) + Proposed Reimbursement Requests 6/15/2017
Funding Category 2006-2008 2008-2010 2010-2015 2015-2020 2020-2025 2025-2031 Total
Uncommitted
Balance RB270 TVI
Proposed
TVI June 2017 Williamson Co. City of Leander Crescent Oak Creek
St. David's
Hospital
Proposed AREA
Leander 1 June
2017
Proposed
Bruce
Nakfoor
Cash
Contributions
Impact Fee
Revenues** Total Committed
Administration 6,600$ 33,567$ 650,000$ 100,000$ 100,000$ 59,833$ 950,000$ 300,000$ 650,000$ 650,000$
Engineering Design-Consulting 42,349$ 650,000$ 650,000$ 757,651$ 2,100,000$ 583,036$ 369,912$ 997,052$ 150,000$ 1,516,964$
Water
Transmission 437,400$ 3,000,000$ 3,000,000$ 1,987,600$ 8,425,000$ 7,630,000$ 795,000$ 2,730,000$ (2,730,000)$ 795,000$
Storage
contribution -$ -$ -$
Necessary Connections 1,840,000$ 1,500,000$ 500,000$ 3,840,000$ 629,050$ 63,500$ 250,000$ 432,450$ 200,000$ 2,265,000$ 3,210,950$
Offsite Contribution 450,000$ 450,000$ 450,000$ -$
Sub-Tot 12,715,000$ 8,709,050$ 4,005,950$
Wastewater
Brushy Creek Basin
Interceptor 1,000,000$ 1,090,000$ 2,090,000$ 1,839,088$ 708,200$ (457,288)$ 250,912$
Laterals/Main Collectors 500,000$ 550,000$ 250,000$ 1,300,000$ (1,705,585)$ 150,000$ 1,300,000$ 300,000$ 1,605,000$ 490,000$ (839,415)$ 3,005,585$
Lift Station 500,000$ 250,000$ 250,000$ 1,000,000$ 783,171$ 612,000$ (395,171)$ 216,829$
Force Main 150,000$ 240,000$ 390,000$ 390,000$ -$
San Gabriel Basin
Interceptor 100,000$ 650,000$ 750,000$ 371,880$ 378,120$ 378,120$
Laterals 250,000$ 250,000$ 200,000$ 700,000$ 129,700$ 570,300$ 570,300$
Lift Station 300,000$ 300,000$ 350,000$ 950,000$ 470,000$ 480,000$ 480,000$
Force Main 200,000$ 200,000$ 200,000$ -$
Offsite Contribution 250,000$ 250,000$ 250,000$ 750,000$ 750,000$ -$
Sub-Tot 8,130,000$ 3,228,254$ 4,901,746$
Transportation
RM 2243 1,075,000$ 1,075,000$ 2,150,000$ 2,150,000$ -$
San Gabriel Parkway 2,000,000$ 2,700,000$ 4,700,000$ -$ 4,700,000$ 4,700,000$
CR 273 388,511$ 311,489$ 700,000$ 60,000$ 200,000$ 200,000$ 10,000$ 80,000$ 150,000$ 640,000$
CR 269 700,000$ 700,000$ 1,400,000$ 1,400,000$ -$
US 183 Improvements 1,000,000$ 1,000,000$ 1,050,000$ 3,050,000$ 3,050,000$ -$
Required Roadways 12,000$ 1,000,000$ 1,500,000$ 1,488,000$ 4,000,000$ 1,004,776$ 715,000$ 1,830,224$ 450,000$ 2,995,224$
Necessary Connections 350,000$ 350,000$ 300,000$ 1,000,000$ (8,162,908)$ 42,908$ 850,000$ 770,000$ 7,500,000$ 9,162,908$
183A enhancements - connections 750,000$ 750,000$ 500,000$ 2,000,000$ 500,000$ 1,500,000$ 1,500,000$
Sub-Tot 19,000,000$ 1,868$ 18,998,132$
Rail Station
Rail Station Improvements 1,500,000$ 1,500,000$ 3,000,000$ 3,000,000$ -$
Drainage - Detention
Regional Facilities 1,600,000$ 1,600,000$ 3,200,000$ (14,572)$ 20,000$ 1,784,529$ 860,043$ 550,000$ 3,214,572$
Ponds 325,000$ 325,000$ 650,000$ 112,121$ 362,955$ 174,924$ 537,879$
Main Collectors 225,000$ 225,000$ 450,000$ 450,000$ -$
Phased Detention 135,000$ 135,000$ 270,000$ 270,000$ -$
Offsite Facilities 500,000$ 500,000$ 1,000,000$ (1,775,000)$ 2,775,000$ 2,775,000$
Property/Easements 350,000$ 350,000$ 700,000$ 700,000$ -$
Committed Funds*
Attachment #3
188
Leander TIRZ Project Plan
Leander TIRZ Project Plan (Rev. 11/16/2016) + Proposed Reimbursement Requests 6/15/2017
Funding Category 2006-2008 2008-2010 2010-2015 2015-2020 2020-2025 2025-2031 Total
Uncommitted
Balance RB270 TVI
Proposed
TVI June 2017 Williamson Co. City of Leander Crescent Oak Creek
St. David's
Hospital
Proposed AREA
Leander 1 June
2017
Proposed
Bruce
Nakfoor
Cash
Contributions
Impact Fee
Revenues** Total Committed
Committed Funds*
Water Quality (some overlap with Detention)
Treatment Facilities (BMPs) 790,000$ 790,000$ 1,580,000$ (1,169,874)$ 675,000$ 877,141$ 422,733$ 775,000$ 2,749,874$
Phased Treatment 125,000$ 125,000$ 100,000$ 350,000$ 350,000$ -$
Property/Easements 225,000$ 225,000$ 450,000$ 450,000$ -$
Off-site Facilities 250,000$ 250,000$ 500,000$ 500,000$ -$
Sub-Tot 9,150,000$ (127,325)$ 9,277,325$
Design Enhancements
Street Lighting 300,000$ 300,000$ 300,000$ 900,000$ (2,345,944)$ 83,152$ 680,000$ 57,792$ 150,000$ 2,275,000$ 3,245,944$
Plazas/Features 300,000$ 350,000$ 300,000$ 950,000$ (5,525,793)$ 110,835$ 214,958$ 6,150,000$ 6,475,793$
Greenspace Treatments 300,000$ 350,000$ 300,000$ 950,000$ (2,248,987)$ 71,737$ 227,250$ 2,900,000$ 3,198,987$
Other (unique improvements that benefit the TOD) 200,000$ 150,000$ 100,000$ 450,000$ (1,525,000)$ 1,975,000$ 1,975,000$
Sub-Tot 3,250,000$ (11,645,724)$ 14,895,724$
Other Utilities
Natural Gas 1,000,000$ 550,000$ 1,550,000$ (550,000)$ 350,000$ 1,750,000$ 2,100,000$
Dry Utilities 3,500,000$
6,600$ 33,567$ 1,530,260$ 24,051,489$ 24,830,000$ 9,393,084$ Total 59,845,000$ 489,159$ 569,912$ 1,569,184$ 1,955,000$ 4,700,000$ 1,445,000$ 13,468,245$ 4,220,374$ 2,000,000$ 33,550,000$ 300,000$ (4,421,874)$ 59,355,841$
Notes:
** - The Crescent agreement provides for a portion of the water and wastewater impact fees collected from connections into the funded water and wastewater improvements to be paid to the TIRZ account to be used to fund the reimbursements. These amounts are based on the total number of LUEs only within the Crescent property and at the impact fee rates as of October 2014
* - The committed amounts are maximum dollar amounts that are subject to any pro-rata cost calculations, multipliers, reductions or other stipulations in the approved reimbursement agreements.
189
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Historic Preservation Ordinance
BACKGROUND: In February of this year the City Council appointed an Historical Preservation Commission to work on programs to preserve and promote the City's historic resources. The Commission recommended and the Council approved moving forward with the creation of an historic preservation ordinance.
This item will allow Council to give direction to staff on the type of preservation ordinance to prepare.
ATTACHMENTS: 1. Sample Historic Preservation Ordinance from Texas Historical Commission2. City of McKinney incentive program3. City of Belton historic preservation ordinance
PREPARED BY: Tom Yantis, Assistant City Manager
190
PROPOSED Ordinance Historic Landmark Preservation Ordinance For The City of ________________, Texas
WHEREAS, CH. 211 TEXAS LOCAL GOVERNMENT CODE, the Municipal Zoning Authority, specifically authorizes zoning functions and procedures for municipalities; and
WHEREAS, CH. 211 TEXAS LOCAL GOVERNMENT CODE, Section 211.003(b) provides that in the case of designated places and areas of historical, cultural, or architectural importance and significance, the governing body of a municipality may regulate the construction, reconstruction, alteration, or razing of buildings and other structures.
WHEREAS, CH. 211 TEXAS LOCAL GOVERNMENT CODE, Section 211.005(a) authorizes the governing body of a municipality to divide the municipality into districts, within which the governing body may regulate the erection, construction, reconstruction, alteration, repair, or use of buildings, other structures, or land and within which zoning regulation must be uniform for each class or kind of building in a district; however, zoning regulations may vary from district to district.
WHEREAS, CH. 214 TEXAS LOCAL GOVERNMENT CODE, Section 214.00111 provides additional authority to preserve substandard buildings as historic property which applies only to a municipality that is designated as a certified local government by the state historic preservation officer as provided by 16 U.S.C.A. Section 470 et seq.
NOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF __________________, TEXAS:
Section 1. Purpose
The City Council of __________ hereby declares that as a matter of public policy the protection, enhancement, and perpetuation of landmarks and districts of historical and cultural importance and significance is necessary to promote the economic, cultural, educational, and general welfare of the public. This act is intended to:
(a) protect and enhance the landmarks and districts which represent distinctive elementsof __________’s historic, architectural, and cultural heritage;
(b) foster civic pride in the accomplishments of the past;
(c) protect and enhance __________’s attractiveness to visitors and the support andstimulus to the economy thereby provided;
(d) insure the harmonious, orderly, and efficient growth and development of the city thatis sensitive to its historic resources;
191
(e) promote economic prosperity and welfare of the community by encouraging the mostappropriate use of historic properties within the city;
(f) encourage stabilization, restoration, and improvements of such properties and theirvalues by offering incentives for rehabilitation.
Section 2. Definitions.
Architectural Details shall mean the small details like moldings, carved woodwork, etc. that add character to a building.
Alteration shall mean any act or process that changes one of more historic, architectural, or physical features of an area, site, place, and/or structure including, but not limited to the erection, construction, reconstruction or removal of any structure.
Applicant means a person seeking a designation or authorization under this Chapter or the person's designated and duly authorized agent or representative. This term may include the property owner, occupant of the site, the Historic Preservation Commission ("HPC") or City Commission.
Appurtenant features means the features that define the design of a building or property including but not limited to porches, railings; columns, shutters, steps, fences, attic vents, sidewalks, driveways, garages, carports, outbuildings, gazebos, and arbors.
Archeological property/site means any locale where there is physical evidence of past human activity that is either prehistoric or historic in age.
Building shall refer to a dwelling, such as a house, barn, church, hotel, or similar structure created to shelter any form of human activity. The term may also be used to refer to a historically and functionally related unit, such as a courthouse and jail or a house and barn. The term also includes mobile homes, manufactured homes, and industrial housing.
Certificate of Appropriateness shall mean an order issued by the Heritage Preservation Board indicating approval of plans for alteration, construction, or removal affecting a designated landmark or property within a designated district.
Certified Local Government shall mean a local government certified or approved by the State Historic Preservation Office (SHPO), which has an appointed commission to oversee the survey and inventory of historic resources, to review areas for historically significant structures, and to develop and maintain community planning and education programs.
Contributing building shall mean a historic building that is at least 50 years old or older that retains a significant amount of its physical integrity and character defining features including location, setting, design, construction, workmanship, and/or association with historical persons or events.
192
Design Guidelines shall mean guidelines of appropriateness or compatibility of building design within a community or historic district. Often in the form of a handbook, design guidelines contain drawings accompanying "do's and don't's" for the property owner. The Historic Preservation Commission has authority to administer design guidelines.
Design review shall refer to the decision making process conducted by the heritage preservation board or an appointed heritage preservation officer that is guided by established terms
Demolition by Neglect shall mean allowing a building to fall into such a state of disrepair that it becomes necessary or desirable to demolish it.
Exterior Architectural Feature shall mean but not be limited to architectural style and general arrangement of such portion of the exterior of a structure as is designed to be open to the view from a public way.
Façade shall mean the entire building front including the parapet.
Historic Preservation Commission (HPC) shall mean the five member Board established under this ordinance and appointed by City Council.
Historic designations means an official recognition of the significance of a building, property or district. Designation can occur on three different levels:
Federal - The National Register of Historic Places (for both individual buildings and entire districts);
State - Recorded Texas Historic landmarks (only for individual buildings) and State Archeological Landmarks; or
Local - designated under a municipal historic ordinance either individually as a landmark or as a locally designated district.
Historic Districts shall mean any neighborhood or region designated by City Council as a historic district.
Historic Landmarks shall mean a building, structure object or site designated by City Council as a historic landmark.
Historic Preservation means the protection. reconstruction, rehabilitation, repair and restoration of places and structures of historic, architectural, or archeological Significance.
Historic Rehabilitation shall mean the process of returning a property to a state of utility, through repair or alteration, which makes possible an efficient contemporary use while preserving those portions and features of the property which are significant to its historic, architectural, and cultural values.
193
Historic Resource shall mean any building, structure, object or site that is 50 years or older or any resource that has been identified as a high or medium priority because of its unique history or architectural characteristics.
Historic Resources Survey means a systematic, detailed examination of an area designed to gather information about histone properties sufficient to evaluate them against predetermined criteria of significance.
Integrity means the authenticity of a property's historic identity, evidenced by survival of physical characteristics that existed during the property's historic or prehistoric period.
Inventory means a list of historic properties that have been identified and evaluated as meeting specified criteria of significance.
Local Historic District means a geographically and locally defined area that possesses a significant concentration, linkage, or continuity of buildings, objects, sites, structures, or landscapes united by past events, periods, or styles of architecture, and that, by reason of such factors, constitute a distinct section of the City. Historic sites within a local district need not be contiguous. for an area to constitute a district. All sites, buildings, and structures within a local historic district, whether individually contributing or not are subject to the regulations of the district.
Local Historic Landmark means any site, building, structure, or landscape of historic significance that receives designation by the City pursuant to this Chapter.
Minor alterations shall mean the installation or alteration to awnings, fences, gutters, downspouts, and incandescent lighting fixtures; restoration of original architectural features that constitute a change from the existing condition; alterations to signs; and additions and changes not visible from any street to the rear of the main structure or to an accessory structure.
National Register of Historic Places shall mean the nation’s official list of buildings, districts, and sites (including structures and objects) significant in American history and culture, architecture, archeology, and engineering maintained by the National Park Service and administered on a state-wide basis by the Texas Historical Commission. Restrictions on these properties exist only when there is an undertaking that uses federal funds or that requires a federal permit or license.
Object means a physical item associated with a specific setting or environment that is movable by nature or design, such as statuary in a designed landscape. The term object is used to distinguish from buildings and structures those constructions that are primarily artistic in nature or are relatively small in scale and simply constructed.
Order of Demolition shall mean an order issued by the Heritage Preservation Board indicating approval of plans for demolition of a designated landmark or property within a designated district.
194
Ordinary Maintenance shall mean repair of any exterior or architectural feature of a landmark or property within a historic district which does not involve a change to the architectural or historic value, style or general design. In-kind replacement or repair is included in this definition of ordinary maintenance.
Overlay District shall mean zoning, applied over one or more other districts, creates a second, mapped zone that is superimposed over the conventional zoning districts. Overlay district typically provide for a higher level of regulations in certain areas such as transit station areas, downtown areas, and historic districts, but may also be used to permit exceptions or less restrictive standards (fewer parking paces in a downtown or transit station area, or more density in an economic development area).
Owner shall mean the individual, corporation, partnership, or other legal entity in whom is vested the ownership, dominion, or title of property and who is responsible for payment of ad valorem taxes on that property; including a Lessor or Lessee if responsible for payment of ad valorem taxes.
Preservation shall mean the stabilization of an historic building, its materials and features in their present condition to prevent future deterioration. Preservation focuses on the maintenance and repair of existing historic materials and retention of a property's form as it has evolved over time. (Protection and Stabilization have now been consolidated under this treatment.)
Preservationist shall mean someone with experience, education or training in the field of preservation.
Reconstruction shall mean the act or process of reproducing by new construction the exact form and detail of a vanished building as it appeared at a specific period of time. A technique used earlier in the 20th century, reconstruction is rarely used today because of the preference to use limited financial resources to preserve existing historic buildings.
Recorded Texas Historical Landmark shall mean a state designation for buildings important for their historical associations and which have retained a high degree of their original historic fabric. They must be at least 50 years of age and retain their original exterior appearance. State historical landmarks receive greater legal protection than National Register of Historic Places designations.
Rehabilitation means the act or process of returning a property to a state of utility through repair or alteration that makes possible an efficient contemporary use while preserving those portions or features of the property that are significant to its historical, architectural, and cultural values.
Restoration shall mean returning a property to a state indicative of a particular period of time in its history, while removing evidence of other periods.
195
Secretary of the Interior Standards for Rehabilitation shall mean the standards established by the Secretary of the Interior for advising federal agencies on the preservation/rehabilitation of historic properties listed or eligible for listing on the National Register of Historic Places.
Site means the location of a significant event, a prehistoric or historic occupation or activity, or a building or structure, whether standing, ruined, or vanished, where the location itself possesses historical, cultural, or archeological value regardless of the value of any existing structure.
State Archeological Landmark shall mean a designation made by the Texas Historical Commission and, in the case of privately owned property, with the landowner’s permission. Although called “archeological” landmarks, this designation can include buildings as well as archeological sites. For a building to be designated as a State Archeological Landmark, it must first be listed on the National Register of Historic Places. Damage to a State Archeological Landmark is subject to criminal, not civil, penalties.
State Historic Preservation Office (SHPO) shall mean the State Office responsible for administering federal historic preservation programs as defined in the National Historic Preservation Act of 1966 as amended and subsequent legislation. The Executive Director of the Texas Historical Commission serves as SHPO for the State of Texas.
Site is the location of a significant event a prehistoric or historic occupation or activity or a building or structure whether standing ruined or vanished where the location itself possesses historical cultural or archeological value regardless of the value of any existing structure
Structure is a term used to distinguish specific types of functional constructions from buildings that are usually made for purposes other than creating shelter
Zoning means a police power measure, enacted by a municipality, including the City, in which the community is divided into districts or zones within which permitted and special uses are established as are regulations governing lot size, building bulk, placement, and other development standards.
Section 3. __________ Historic Preservation Commission
There is hereby created a commission to be known as the __________ Historic Preservation Commission, hereafter referred to as the “HPC.”
1) The HPC shall consist of _____ members to be appointed, upon application anddemonstration of their qualifications to the extent available among the residents of thecommunity, by the City Council with primary consideration given to professional membersfrom the disciplines of architecture, history, urban planning, real estate, legal, archeology, orother disciplines related to historic preservation. When a professional in the fields of history,architecture, architectural history, planning, or archaeology is not represented in themembership of the HPC, then the city shall seek and provide outside expertise in theappropriate discipline when considering National Register nominations and all federal
196
undertakings that will affect historic properties which are normally evaluated by a professional in such disciplines.
(a) The HPC, regardless of professional background, all members shall be residents ofthe city and at least two (2) members shall reside or own property within a District.
(b) All HPC members must have a known and demonstrated interest, competence, orknowledge in historic preservation within the city and/or the county.
(c) The HPC as a whole shall represent the ethnic makeup of the city.
(d) HPC members shall be identified by place numbers 1 through ___ and the terms ofoffice serve be staggered. The initial term for even-numbered Places shall serve fortwo years and odd-numbered Places shall serve for three years. The City Council mayre-appoint HPC members as their terms expire not to exceed three consecutive terms.The Mayor shall fill any vacancies that may occur before a term has expired, only forthe remainder of the term.
(e) Any member may resign by submitting a letter of intent to the HPO that has been readinto the official HPC minutes and forwarded to the Mayor. The City Council mayterminate any HPC member upon cause of an appropriate hearing or upon the absenceof over 50% of the scheduled HPC meetings within a calendar year.
(f) The Chairperson and Vice Chairperson of the HPC shall be elected by and from itsmembership.
(g) A quorum for the transaction of business shall consist of not less than five (5)members the HPC.
(h) The HPC shall meet at least monthly, if business is at hand. Special meetings may becalled at any time by the HPC Chairperson, Vice Chairperson or at the written requestof at least five HPC members. All meetings shall be held in conformance with theTexas Open Meetings Act, Chapter 552 of the Texas Government Code as Annotated.
2) The HPC shall be empowered to:
(a) Make recommendations to the city for the employment of staff and professionalconsultants as necessary to carry out the duties of the HPC.
(b) Adopt parliamentary rules and procedures necessary to carry out the business of theHPC, which shall be ratified by the City Council.
(c) Review and take action on the designation of Landmarks and the delineation ofDistricts, which shall be ratified by the City Council.
197
(d) Recommend and confer recognition upon the owners of Landmarks or propertieswithin Districts by means of certificates, plaques, or markers.
(e) Review and recommend to City Council and other applicable city boards andcommissions all proposed changes to the zoning ordinance, building code, generalplan or other adopted policies of the city than may affect the purpose of the Article.
(f) Conduct public hearings and provide comment on buildings, objects, sites, structures,and districts for nomination to the National Register of Historic Places to the TexasHistoric Commission. Such recommendations shall be guided by the criteriaestablished in the National Historic Preservation Act of 1966, as amended.
(g) Implement and maintain a system of survey or inventory of significant historic,architectural, and cultural landmarks and all properties located within designatedDistricts located in the city. Such information shall be maintained securely, madeaccessible to the public and should be updated at least every ten (10) years.
(h) Monitor and report to the Texas Historical Commission all actions affecting anyRecorded Texas Historic Landmark, State Archaeological Landmark, NationalRegister property and any locally designated Landmark, as deemed necessary.
(i) Create sub-committees from among its membership and delegate to thesecommittees’ responsibilities to carry out the purposes of this Article.
(j) Maintain written meeting minutes which are recorded by staff and demonstrate allactions taken by the HPC and the reasons for taking such actions.
(k) Increase public awareness of the value of historic, cultural, and architecturalpreservation by developing and participating in public education programs.
(l) Review and take action on all Certificates of Appropriateness applications forcompliance with adopted Design Guidelines pursuant to this Article.
(m) Review and take action on all appeals on action taken by the HPO regarding theadministrative review of Certificates of Appropriateness applications for compliancewith adopted Design Guidelines pursuant to this Article.
(n) Develop, prepare and adopt specific Design Guidelines which shall be ratified by theCity Council, for use in the review of all Certificates of Appropriateness applications.
(o) Prepare and submit annually to the City Council a report summarizing budget costs,goals and objectives and work completed during the previous year, as well asanticipated budgetary requests.
(p) Make recommendations to the city concerning the utilization of state, federal, orprivate funds to promote the preservation of Landmarks and Districts within the city.
198
(q) Recommend to City Council the acquisition of endangered Landmarks by demolitionwhere its preservation is essential to the purpose of this Article and where privatepreservation is not feasible.
(r) Propose incentive program(s) to City Council for local property owners of historicLandmarks or within local Districts.
(s) Review and take action on all city preservation-related incentive program applicationsinvolving work on Landmarks and Districts for compliance with adopted DesignGuidelines pursuant to this Article.
(t) Accept on behalf of the city government donations of preservation easements anddevelopment rights as well as any other gift of value for the purpose of historicpreservation, subject to the approval of City Council
(u) Provide comment to the Texas Historical Commission on any federal undertakings(projects utilizing federal funds or requiring a federal permit) pursuant to Section 106of the National Historic Preservation Act of 1966, as amended
Section 4. Appointment of Historic Preservation Officer
The City Manager or its designee shall appoint a qualified city official, or staff person to serve as Historic Preservation Officer (HPO). The HPO must have an interest, knowledge and a demonstrated background in the disciplines of architecture, history, urban planning, real estate, legal, archeology, or other disciplines related to historic preservation. In the absence of a qualified official or staff person of the municipality, a volunteer resident of the city may be appointed by City Council as HPO. The HPO shall be empowered to:
a) Administer this ordinance and advise the HPC on matters submitted to it.
b) To maintain and hold open for public inspection all documents and records pertaining tothe provisions of this Article.
c) Receive and review all applications pursuant to this Article to ensure their completeness.
d) Review and take action on all Certificates of Appropriateness applications subject toadministrative review pursuant to this Article.
e) Review and forward with any recommendations all applications for Certificates ofAppropriateness subject to review by the HPC pursuant to this Article.
f) Ensure proper posting and noticing of all HPC meetings, schedule applications for HPCreview, provide packets to its members prior to the meetings, record meeting minutes andfacilitate all HPC meetings.
199
g) Review and help coordinate the city's preservation and urban design activities with thoseof local, state and federal agencies and with local, state, and national preservationorganizations in the private sector.
Section 5. Criteria for Designation of Local Historic Landmarks and Districts
Properties that are listed as a Recorded Texas Historic Landmark (RTHL), State Archeological Landmark (SAL) or listed on the National Register of Historic Places (NR) shall be considered as recognized local Landmarks.
1) An individual Landmark may be designated if it is at least fifty (50) years old and itsubstantially complies with two or more of the following:
(a) Possesses significance in history, architecture, archeology, and culture.
(b) Is associated with events that have made a significant contribution to the broad patterns oflocal, regional, state, or national history.
(c) Is associated with events that have made a significant impact in our past.
(d) Represents the work of a master designer, builder, or craftsman.
(e) Embodies the distinctive characteristics of a type, period, or method of construction.
(f) Represents an established and familiar visual feature of the city.
2) A District may be designated if it substantially complies with both of the following:
(a) Contains properties and an environmental setting which meet two or more of the criteriafor designation of a landmark, and;
(b) Constitutes a distinct section of the city.
Section 6. Designation of Local Historic Landmarks and Districts
a) These provisions pertaining to the designation of historic landmarks constitutes a part ofthe comprehensive zoning plan of the City of __________.
b) The procedure for designating a historic Landmark or to establish or amend a historicDistrict may be initiated by the city, or by the individual property owner(s), or by at least20% of the residents of the potential District. An application for Determination ofSignificance shall be made on forms as prescribed by the city and shall be filed with theHPO along with fees in accordance with the municipal fee schedule. Buildings,structures, sites or areas located within the city which substantially complies with the
200
criteria found in Section 5 may be recommended to the City Council as Landmarks or Districts by the HPC. The application shall contain:
(i) Name, address, telephone number of applicant, and physical address of the individualproperty, or
(ii) Name, address, telephone number of applicant, and signed petition of at least 20% ofthe proposed area.
(iii) Site plan of the individual property or map indicating the geographic boundaries ofthe proposed area showing all affected buildings and/or structures.
(iv) Detailed historic description and background on the property or area.
(v) Current photographs of the overall property or area along with any historicalphotographs, if available.
(iii) Any other information which the HPO or HPC may deem necessary.
c) Upon receipt of a completed for a Determination of Significance application, the HPOshall schedule a hearing at the next available regularly scheduled HPC meeting. Notice ofthe application shall be mailed to the property owner(s) and posted on the property by thecity for a minimum period of fourteen (14) days prior to the scheduled hearing. Apublished notice of the scheduled hearing shall also be made in accordance with theTexas Open Meeting Act. Notice of applications for proposed Districts shall be mailed toeach affected property owner and posted at least four (4) separate locations that arevisible from the public right-of-way at its external boundaries for a minimum period offourteen 14 days prior to the scheduled hearing. A published notice of the scheduledhearing shall also be made in accordance with the Texas Open Meeting Act.
d) An individual property or area that is under review by the city for a formal Determinationof Significance shall be protected by and subject to all of the provisions of this Articlegoverning demolition, minimum maintenance standards and penalties until a finaldecision by the City Council becomes effective.
e) At the hearing, the applicant shall have an opportunity to present testimony and evidenceto demonstrate the historical Significance, or insignificance of the subject property orarea. Other interested parties and technical experts may also present testimony ordocumentary evidence which will become part of a record. The burden of proof shall beupon the applicant.
f) The HPC may take action to approve, postpone requesting additional information or denythe application. The HPO shall forward any final recommendation to the Planning andZoning Commission within thirty (30) days of the hearing. Denials may be appealeddirectly to City Council.
201
g) The Planning and Zoning Commission shall give notice and conduct its hearing uponreceipt of the recommendation from the HPC. Notice for such hearing shall be in thesame manner and the hearing held according to the same procedures as specificallyprovided in the general zoning ordinance of the City of __________. The Planning andZoning Commission shall review the application to ensure that the recommendeddesignation will not pose a conflict with the underlying land use zoning and shall forwardits recommendation to the City Council within thirty (30) days after taking action on theapplication.
h) Upon receipt of the joint recommendation on the application from the HPC and thePlanning and Zoning Commission, the City Council shall schedule a hearing on theapplication within within thirty (30) days. Notice for such hearing shall be in the samemanner and the hearing held according to the same procedures as specifically provided inthe general zoning ordinance of the City of __________. Significance shall beconsidered only on the record made before the HPC and the Planning and ZoningCommission.
i) Upon designation of a Landmark or District by the city council, the designation shall berecorded by legal description on the city's official zoning maps, in the records of realproperty of Anderson County, and with the tax appraisal office.
j) The applicant or any persons adversely affected by any determination of the HPC mayappeal the decision to city council. Appeal requests shall be on forms as prescribed by thecity and shall be filed with the HPO within seven (7) days of the HPC’s decision andscheduled for the next available regularly scheduled city council meeting. Notice for suchhearing shall be in the same manner and the hearing held according to the sameprocedures as specifically provided in the general zoning ordinance of the City of__________. Appeals to the City Council shall be considered only on the record madebefore the HPC, and may only allege that the HPC’s decision was arbitrary, capricious, orillegal.
Section 7. Minimum Maintenance Standards
No owner or person with an interest in real property designated as a Landmark or a property located within a District shall permit the property to fall into a serious state of disrepair so as to result in the significant deterioration of any exterior architectural feature which would, in the judgment of the HPC, create a detrimental effect upon the historic character of the Landmark or District.
1) Examples of serious disrepair or significant deterioration include:
(a) Deterioration of exterior walls, foundations, or other vertical support that causesleaning, sagging, splitting, listing, or buckling.
(b) Deterioration of external chimneys that causes leaning, sagging, splitting, listing, orbuckling.
202
(c) Deterioration or crumbling of exterior plaster finishes, surfaces or mortars.
(d) Ineffective waterproofing of exterior walls, roofs, and foundations, including brokenwindows or doors.
(e) Defective protection or lack of weather protection for exterior wall and roofcoverings, including lack of paint, or weathering due to lack of paint or otherprotective covering.
(f) Rotting, holes, and other forms of material decay.
(g) Deterioration of exterior stairs, porches, handrails, window and door frames, cornices,entablatures, wall facings, and architectural details that causes delamination,instability, loss of shape and form, or crumbling.
(h) Deterioration that has a detrimental effect upon the special character of the district asa whole or the unique attributes and character of the contributing structure.
(i) Deterioration of any exterior feature so as to create or permit the creation of anyhazardous or unsafe conditions to life, health, or other property.
Section 8. Procedure to mitigate Demolition by Neglect
Demolition by Neglect refers to the gradual deterioration of a property when routine or minimum maintenance is not performed. The HPO and the Development Services Department staff shall work together in an effort to reduce Demolition by Neglect involving Landmarks or properties located within Districts within the city. A Demolition by Neglect citation as determined by the HPC may be issued against the owner of the property for failure to comply with the minimum maintenance standards by permitting the subject property to exhibit serious disrepair or significant deterioration as outlined in Section 40-107 herein.
1) Due to the time consuming nature of pursuing enforcement under this section, no more thanone property will be under consideration during each of the following quarters (January- March,April-June, July-September, and October- December).
2) While the HPO will act as the point of contact, the Development Services Department staffshall, when needed, assist with inspections. If there is a dispute between the HPO andDevelopment Services Department staff, the City Manager may be consulted as a mitigatingparty.
3) The procedure for citing a property for Demolition by Neglect shall be as follows:
(a) Initial identification is made by visual inspection of the area by the HPO or an HPCmember or by referral from someone in the area. All referrals shall be made in writing andshall be submitted to the HPO.
203
(i) Once the initial identification is made, followed by a preliminary determination bythe HPO, the property owner shall be notified by US mail of the defects of thebuilding and informed of various incentive programs that may be available for repair.The owner is given thirty (30) days in which to respond to the preliminarydetermination by submitting a stabilization proposal to HPO. The stabilizationproposal will be presented to the HPC at the next available meeting. If the HPCapproves the proposal, a Certificate of Appropriateness (if necessary) may be issuedadministratively by the HPO. The approval will detail the specific work which isnecessary to correct the Demolition by Neglect conditions, as well as a time period tobegin and complete the work. The HPO shall update the HPC on the status of theproperty every thirty (30) days once work begins on the property.
(ii) If the property owner receives the letter regarding the preliminary determination,but fails to respond, a second notice shall be sent in the same manner as describedabove.
(iii) If the property owner fails to receive and/or respond to the letter regarding thepreliminary determination after two (2) attempts, the matter returns to the HPC for acitation hearing. The HPO shall send a third notice via certified mail informing theowner of the hearing, the property is posted with a notice of the violation inaccordance with the provisions of this Article, and a public hearing on the citation isscheduled.
(iv) At the public hearing the owner is invited to address the HPC’s concerns and toshow cause why a citation should not be issued. The HPC may take action to approveany proposed work, defer the matter to give the owner more time either to correct thedeficiencies or make a proposal for stabilization, or issue a citation to the owner ofthe property for failure to correct the Demolition by Neglect conditions.
(v) If the owner is cited for the condition of Demolition by Neglect of the property, heis given fourteen (14) days to submit a stabilization proposal to the HPO, and at thediscretion of the HPC, up to one (1) year to correct the defects. The HPO shall updatethe HPC on the status of the property every thirty (30) days once work begins on theproperty.
(vi) If the owner does respond with a stabilization proposal, the matter is turned overto the City Attorney's office for action in Municipal Court.
Section 9. Ordinary Maintenance
Nothing in this ordinance shall be construed to prevent the ordinary maintenance and repair of any exterior architectural feature of a landmark or property within a historic district which does not involve a change in design, material, or outward appearance that require the issuance of a building permit. In-kind repair/replacement and repainting is included in this definition of ordinary maintenance unless painting involves an exterior masonry surface that was not
204
previously painted. The HPO shall be in charge of making the decisions as to what is "ordinary maintenance."
Section 10. Certificates of Appropriateness for Alterations or New Construction Affecting Landmarks or Historic Districts
No person shall carry out any construction, reconstruction, alteration, restoration, rehabilitation, or relocation of any Landmark or any property within a District, nor shall any person make any material change in the light fixtures, signs, sidewalks, fences, steps, paving, or other exterior elements visible from a public right-of-way which affect the appearance and cohesiveness of any Landmark or any property within a District without a Certificate of Appropriateness application. The application must be reviewed and approved by the HPO or the HPC prior to the issuance of any building permit involving any Landmark or property located within a District. The application shall be required in addition to, and not in lieu of, any required building permit.
Section 11. Review Criteria for Certificates of Appropriateness for Alterations or New Construction Affecting Landmarks or Historic Districts
In considering an application for a Certificate of Appropriateness, the HPO and the HPC shall review it for compliance with The Secretary of the Interior’s Standards for Rehabilitation and any applicable adopted Design Guidelines previously ratified by the City Council. The Standards and any applicable adopted Design Guidelines shall apply in all zones within the city bearing the suffix “HD” or individual properties bearing the suffix “HL.”
All review criteria shall be made available to the applicant, property owners of Landmarks and properties located within Districts. The HPC shall promulgate and make recommendations to update the adopted Design Guidelines as necessary, provided that the changes do not pose a conflict with underlying land-use zoning and the changes do not take effect until ratified by the City Council.
Section 12. Procedure for Certificates of Appropriateness for Alterations or New Construction Affecting Landmarks or Historic Districts
The procedure for obtaining a Certificate of Appropriateness may be initiated by the city for all city-owned Landmarks or proposed work within a District, or by the individual property owner(s) of the subject Landmark or for a property located within a District. The application must be submitted for reviewed and approved by the HPO or the HPC prior to the commencement of any work. An application for Certificate of Appropriateness shall be made on forms as prescribed by the city and shall be filed with the HPO along with fees in accordance with the municipal fee schedule.
1) Administrative design review affecting Landmarks and properties located in Districts.
a) Upon receipt of a completed Certificate of Appropriateness application as determined bythe HPO, the HPO shall review the application for a preliminary determination ofcompliance with the Secretary of the Interior’s Standards for Rehabilitation and the
205
adopted Design Guidelines. The applicant is encouraged to schedule a meeting with the HPO prior to the submittal of an application to discuss the proposed work and get initial design direction. The HPO reserves the right to forward any Certificate of Appropriateness application to the HPC for review and approval when direction on design policy is needed or if unable to determine compliance with the the Secretary of the Interior’s Standards for Rehabilitation or the Design Guidelines. Proposed work to all city-owned Landmarks, all proposed work within a District, and for all city preservation-related incentive programs or federal projects must be reviewed by the HPC.
b) Within five (5) days of receipt of a completed Certificate of Appropriateness applicationand a preliminary determination of compliance, notice of the pending administrativeaction shall be mailed to the property owner(s), to all immediate adjacent propertyowner(s), and posted on the property by the city establishing a fourteen (14) day period inwhich written comments may be submitted to the HPO.
c) At the end of the notice period, the HPO shall meet with the Chair of the HPC to reviewthe application and any comments received for design compliance consensus. Ifapproved, the HPO shall issue a Certificate of Appropriateness consisting of writtenfindings of fact, conclusions of law and any specific conditions of approval (if any),supporting the decision. The HPO shall also provide anyone who submitted writtencomments with a copy and forward its decision to the Development Services Department.Any specific conditions of approval as identified by the HPO shall be attached to theconstruction documents prior to the issuance of any building permits. No subsequentchanges shall be made to the approved design without the prior review and approval ofthe HPO. An applicant shall have one (1) year from the date of issuance of a Certificateof Appropriateness to secure a building permit for the specified improvements or it shallbecome null and void.
d) If the HPO and Chair of the HPC finds the proposed work will have an Adverse Effect onthe Landmark, or property located within a District, or if the proposed work isinconsistent with the Secretary of the Interior’s Standards for Rehabilitation or adoptedDesign Guidelines, the HPO shall advise the applicant and any written commenter of thedisapproval of the application and of any changes to the application which are necessaryfor approval of same. A Certificate of Appropriateness application that has been deniedadministratively may not be resubmitted without incorporating changes to the applicationwhich are necessary for approval of the same.
e) If no action has been taken by the HPO within sixty (60) days of the original receipt ofthe application, a Certificate of Appropriateness shall be deemed issued by the HPO andthe HPO shall so advise the applicant in writing.
f) The applicant or any persons adversely affected by the determination of the HPO mayappeal the decision to the HPC. Appeal requests shall be filed in writing to the HPOwithin ten (10) days of the HPO’s decision. The HPO must schedule the appeal for apublic hearing at the next available regularly scheduled HPC meeting. Notice of theappeal shall be posted on the property for a period of fourteen (14) days upon receipt of a
206
formal appeal request. A written notice of the public hearing for the appeal request shall also be provided to all parties who received mailed notice for the original HPO’s preliminary determination. Appeals to the HPC shall be considered only on the record made before the HPO.
2) HPC design review affecting Landmarks and properties located in Districts.
a) Upon receipt of a completed Certificate of Appropriateness application as determined bythe HPO, the HPO shall review the application for a preliminary determination ofcompliance with the Secretary of the Interior’s Standards for Rehabilitation and anyapplicable adopted Design Guidelines. The applicant is encouraged to schedule a meetingwith the HPO prior to the submittal of an application to discuss the proposed work andget initial design direction.
b) Within five (5) days of receipt of a completed Certificate of Appropriateness and apreliminary determination of compliance, the HPO shall schedule a public hearing at thenext available regularly scheduled HPC meeting. Notice of the pending HPC hearing forcompliance with the Secretary of the Interior’s Standards for Rehabilitation and anyadopted Design Guidelines shall be mailed to the property owner(s), to all immediateadjacent property owner(s), and posted on the property by the city establishing a fourteen(14) day period in which written comments may be submitted to the HPO. A publishednotice of the scheduled hearing shall also be made in accordance with the Texas OpenMeeting Act. All review criteria and the formal written report to the HPO shall be madeavailable to the applicant prior to the hearing.
c) The HPC shall review the application at a regularly scheduled meeting. At that time, theapplicant shall have an opportunity to be heard, present testimony and evidence todemonstrate that the proposed work is in compliance with the Secretary of the Interior’sStandards for Rehabilitation and any adopted Design Guidelines. Other interested partiesand technical experts may also present testimony or documentary evidence which willbecome part of a record. The burden of proof shall be upon the applicant. In the event ahearing is not scheduled within ninety (90) days of receipt of the application, a Certificateof Appropriateness may be granted.
d) The HPC may take action to approve, postpone requesting additional information or denythe application. If no hearing has been scheduled within ninety (90) days of the originalreceipt of the application by the HPO, a Certificate of Appropriateness shall be deemedissued and the HPO shall so advise the applicant in writing.
e) If approved, the HPO shall issue a Certificate of Appropriateness to the applicant with thewritten findings of fact, conclusions of law and any specific conditions of approval (ifany) supporting the decision. The HPO shall also provide anyone who submitted writtencomments with a copy and forward the HPC’s decision to the Development ServicesDepartment. Any specific conditions of approval made by the HPC shall be attached tothe construction documents prior to the issuance of any building permits. No subsequentchanges shall be made to the approved design without the prior review and approval of
207
the HPO or HPC. An applicant shall have one (1) year from the date of issuance of a Certificate of Appropriateness to secure a building permit for the specified improvements or it shall become null and void.
f) If the HPC finds the proposed work will have an Adverse Effect on the Landmark, orproperty located within a District, or if the proposed work is inconsistent with theSecretary of the Interior’s Standards for Rehabilitation or any applicable adopted DesignGuidelines, the HPC shall advise the applicant at the hearing of the disapproval of theapplication and of any changes to the application which are necessary to approval of thesame. Within five (5) days following the meeting, the HPO shall provide the applicantand any written commenter noticing in writing of the disapproval of the application andof any changes to the application which are necessary for approval of the same. ACertificate of Appropriateness application that has been denied may not be resubmittedwithout incorporating changes to the application which are necessary for approval of thesame.
g) The applicant or any persons adversely affected by the action of the HPC may appeal thedecision to the City Council. Appeal requests shall be filed in writing to the HPO withinten (10) days of the HPC’s decision. The HPO must schedule the appeal for a publichearing at the next available regularly scheduled HPC meeting. Notice of the appeal shallbe posted on the property for a period of fourteen (14) days upon receipt of a formalappeal request. A written notice of the public hearing for the appeal request shall also beprovided to all parties who received mailed notice for the HPC hearing.
h) The City Council shall give notice, follow publication procedure, hold hearings, andmake its decision in the same manner as provided in the general zoning ordinance of thecity. Appeals to the City Council shall be considered only on the record made before theHPC, and may only allege that the HPC’s decision was arbitrary, capricious, or illegal.
Section 13. Demolition of Landmarks
It is the intent of this and succeeding sections to preserve the historic and architectural resources of the city through limitations on demolition and removal of Landmarks to the extent it is economically feasible practical and necessary. The demolition or removal of historic buildings structures and sites in the city diminishes the character of the city’s historic Districts and it is strongly discouraged. Instead the city recommends and supports preservation rehabilitation and relocation within the historic district. It is recognized however that structural deterioration, economic hardship and other factors not entirely within the control of the property owner may result in the necessary demolition or removal of a historic building structure or site.
1) Removal or repair of hazardous or dangerous Landmarks.
(a) If the building official determines a Landmark to be structurally unsound and a hazardousor dangerous building pursuant to the provisions found in the city’s adopted buildingcode, the building official shall be required to provide written notice to the HPC of theordered removal or repair of the Landmark prior to taking such action.
208
(b) The provisions contained in Section 214.00111 of the Texas Local Government Codeprovides additional authority to the city to preserve substandard historic buildings and areeffective immediately upon designation as a Certified Local Government by the USDepartment of the Interior, National Park Service and Texas State Historic PreservationOfficer as provided by 16 U.S.C., Section 470 et seq.; and
(c) The property owner(s) of the demolished Landmark removed under this procedure issubject to the penalties found in Section 40-120 herein.
Section 14. Certificates of Appropriateness for Demolition Affecting Landmarks or Historic Districts
No person shall carry out the demolition of a Landmark or property within a District, including secondary buildings and landscape features that are not previously deemed a hazardous or dangerous building by the building official, or without the review and approval of a Certificate of Appropriateness for Demolition application by the HPC. The application shall be required in addition to, and not in lieu of, any required building permit. All demolition permits require a sixty day stay of demolition to allow for exploration of options to preserve the structure.
1) In the absence of a determination by the building official of the subject property as ahazardous or dangerous building, the HPC may consider an application for a Certificate ofAppropriateness for Demolition of a Landmark or property located within a District, only if itmeets compliance with one of the following:
(a) The subject property of the application is not a recognized Landmark.
(b) The subject building, structure or object is not an accessory building and/or landscapefeatures that is integral to the historic interpretation or integrity of the Landmark.
(c) The applicant is requesting a Certificate of Appropriateness for Demolition of aLandmark on the basis of Economic Hardship pursuant to Section 16.
(d) The subject building, structure or object has lost its architectural significance andintegrity over time for reasons not entirely within the control of the current or previousproperty owner(s).
Section 15. Procedure for Certificates of Appropriateness for Demolition Affecting Landmarks or Historic Districts
The procedure for obtaining a Certificate of Appropriateness for Demolition may be initiated by the city for all city-owned Landmarks or proposed work within a District, or by the individual property owner(s) of the subject Landmark or property within a District. The application must be submitted to the HPO for review and approval by the HPC prior to the commencement of any work. An application for Certificate of Appropriateness for Demolition shall be made on forms as prescribed by the city and shall be filed with the HPO along with fees in accordance with the municipal fee schedule.
209
1) The application shall contain:
(a) Name, address, telephone number of applicant, and physical address of the individualproperty.
(b) Site plan of the individual property or map indicating the area of the proposed demolitionshowing all affected buildings and/or structures on the site.
(a) Photographs of existing conditions as well as any historical photographs, if available.
(b) All future development plans for the property, if available.
(c) Any other information which the HPC may deem necessary pursuant to Section 40-117of this Article.
2) An individual property that is under review by the city for a Certificate of Appropriateness forDemolition shall be protected by and subject to all of the provisions of this Article governingdemolition, minimum maintenance standards and penalties until a final decision by the HPCbecomes effective.
3) The procedure for a Certificate of Appropriateness for Demolition shall be the same asprovided for in Section 10 herein.
4) The procedure for a Certificate of Appropriateness for Demolition application involving aclaim of Economic Hardship shall be as follows:
a) Upon receipt of a completed Certificate of Appropriateness for Demolition application,the HPO shall review the application for a preliminary determination of compliance withthe standards for economic hardship and the criteria for review found in Section 40-117herein. The applicant is encouraged to schedule a meeting with the HPO prior to thesubmittal of an application to discuss the application and get initial direction.
b) Within five (5) days of receipt of a completed Certificate of Appropriateness involving aclaim of Economic Hardship and a preliminary determination of compliance, the HPOshall schedule a public hearing at the next available regularly scheduled HPC meeting.Notice of the pending HPC hearing for compliance with the standards for economichardship and the criteria for review. Notice of the hearing shall be mailed to the propertyowner(s), to all immediate adjacent property owner(s), and posted on the property by thecity. The owner shall be required to stabilize and secure the property subject to thepenalties of this Article until a final decision by the HPC becomes effective. A publishednotice of the scheduled hearing shall also be made in accordance with the Texas OpenMeeting Act. All review criteria and the formal written report to the HPO shall be madeavailable to the applicant prior to the hearing.
210
c) The HPC shall conduct its initial review of the application at a regularly scheduledmeeting. At that time, the applicant shall have an opportunity to be heard, presenttestimony and evidence to demonstrate that standards for economic hardship and thecriteria for review have been met. Other interested parties and technical experts may alsopresent testimony or documentary evidence which will become part of a record. Theburden of proof shall be upon the applicant. In the event the HPC does not act withinninety (90) days of receipt of the application, a Certificate of Appropriateness forDemolition may be granted.
d) In considering the application, the HPC shall take action to postpone the application inorder to establish a Stay of Demolition period, during which time the owner shall allowthe city to post a sign stating that the property is subject to demolition. Said sign shall beat least three feet by two feet 3 X 2 readable from a point of public access and state thatmore information may be obtained from the HPO for the duration of the stay. The ownershall conduct in good faith with the city local preservation organizations and interestedparties a diligent effort to seek an alternative that will result in the rehabilitation of theLandmark. Negotiations may include but is not limited to such actions to utilize variouspreservation incentive programs sell or lease the Landmark, or facilitate proceedings forthe city to acquire the Landmark under its power of eminent domain, if appropriate, andfinancially possible. If negotiations are successful, the Certificate for Demolitionapplication shall be considered withdrawn and all associated applications closed.
e) At the end of the one hundred and eighty (180) days, if prior negotiations areunsuccessful and the request for demolition stands, the HPO shall schedule a secondpublic hearing on the application at the next available regularly scheduled HPC meetingpursuant to the same manner described above in Subsection (b).
f) At the end of the second hearing, the HPC may take action to approve, postponerequesting additional information or deny the application. If no hearing has beenscheduled within sixty (60) days of the end of the stay period, a Certificate ofAppropriateness shall be deemed issued and the HPO shall so advise the applicant inwriting.
g) If approved, the HPO shall issue a Certificate of Appropriateness to the applicant with thewritten findings of fact, conclusions of law and any specific conditions of approval (ifany) supporting the decision. The HPO shall also provide anyone who submitted writtencomments with a copy and forward the HPC’s decision to the Development ServicesDepartment. The approval shall be valid for one (1) year from the hearing date of theHPC’s final decision. The historic property shall immediately be removed from the city’sinventory of historic properties the official public records of real property of AndersonCounty and the official zoning maps of the city.
(i) Prior to demolition, the city may as a condition of approval require the ownerto provide documentation of the demolished historic property at the owner’sexpense in accordance with the standards of the Historic American Building
211
Survey (HABS). Such documentation may include photographs, floor plans, measured drawings, an archeological survey, or other information as specified.
(ii) Forward a recommendation to the Planning Commission to place limitationson future development on the subject property in regard to square footage,building footprint, scale mass, height, setbacks, etc. of the demolished Landmarkto help ensure infill that is architecturally compatible.
(iii) Approvalforthedemolitionofastructuremaybeconditionedupontheconstructionofanacceptablereplacementstructure,orlandscapeorparkplan.Abondorotherfinancialguarantyintheamountofthecostofthereplacementstructuremayberequiredinordertoassuretheconstructionofthereplacementstructure,orpark,orlandscapeplan.
(iv) Forward a recommendation to the Planning Commission to place limitationson future development on the subject property in regard to square footage,building footprint, scale mass, height, setbacks, etc. of the demolished Landmarkto help ensure infill that is architecturally compatible.
(v) The city may also require the owner to incorporate an appropriatememorialization of the building, structure or site such as a photographic displayor plaque into any proposed future development project on the property.
(g) Denial of a Certificate of Appropriateness application for Demolition involvingEconomic Hardship shall prevent the owner from demolishing the property or reapplying foranother Certificate of Appropriateness application for Demolition for a period of three (3)years from the hearing date of the HPC’s final decision, unless substantial changes incircumstances have occurred other than resale of the property or those caused by acts beyondthe control of the owner. It shall be the responsibility of the owner to stabilize and maintainthe minimum maintenance standards for the property so as not to create a hazardous ordangerous building as identified in Section 40-113(1) herein.
(h) The city may continue to provide the owner with information regarding financialassistance for the necessary rehabilitation or repair work as it becomes available.
(i) The owner may appeal the decision of the HPC to the City Council. Appeal requests shallbe filed in writing to the HPO within ten (10) days of the HPC’s decision. The City Councilshall give notice, follow publication procedure, hold hearings, and make its decision in thesame manner as provided in the general zoning ordinance of the city. Appeals to the CityCouncil shall be considered only on the record made before the HPC, and may only allegethat the HPC’s decision was arbitrary, capricious, or illegal.
Section 17. Economic Hardship involving Certificates of Appropriateness for Demolition Affecting Landmarks
212
No Certificate of Appropriateness for Demolition involving a claim of economic hardship may be approved, nor shall a demolition permit be issued by the city unless the owner proves compliance with the following standards for economic hardship:
(a) The property is incapable of earning a reasonable return in its current or rehabilitatedstate, regardless of whether that return represents the most profitable return possible.
(b) The property cannot be adapted for any other use, whether by the current owner or by apurchaser, which would result in a reasonable return.
(c) Earnest and reasonable efforts to find a purchaser interested in acquiring the property andpreserving it have failed.
(d) The property cannot be moved or relocated to another site similar site or within theDistrict.
1) The city shall adopt by resolution separate criteria for review in considering claims ofeconomic hardship for investment for income producing and non-income producing properties,as recommended by the HPC. Non-income properties shall consist of owner occupied singlefamily dwellings and non-income producing institutional properties. All standards for reviewshall be made available to the owner prior to the hearing. The information to be considered bythe city may include but not be limited to the following:
(a) Purchase date price and financing arrangements
(b) Current market value
(c) Form of ownership
(d) Type of occupancy
(e) Cost estimates of demolition and post demolition plans for development
(f) Maintenance and operating costs
(g) Inspection report by licensed architect or structural engineer having experience workingwith historic properties
(h) Costs and engineering feasibility for rehabilitation
(i) Property tax information
(j) Rental rates and gross income from the property
(k) Other additional information as deemed appropriate
213
2) Claims of economic hardship by the owner shall not be based on conditions resulting from:
(a) Evidence of demolition by neglect or other willful and negligent acts by the owner
(b) Purchasing the property for substantially more than market value at the time of purchase
(c) Failure to perform normal maintenance and repairs
(d) Failure to diligently solicit and retain tenants
(e) Failure to provide normal tenant improvements
3) Throughout the process, the applicant shall consult in good faith with the HPO, localpreservation groups and interested parties in a diligent effort to seek an alternative that will resultin preservation of the property. Such efforts must be demonstrated to the HPC at the hearing.
Section 18. Enforcement
All work performed pursuant to a certificate of appropriateness issued under this ordinance shall conform to any requirements included therein. It shall be the duty of the building inspector to inspect periodically any such work to assure compliance. In the event work is not being performed in accordance with the certificate of appropriateness, or upon notification of such fact by the HPC and verification by the HPO, the building inspector shall issue a stop work order and all work shall immediately cease. The property owner shall then be required to apply for a hearing before the HPC to explain the non-compliance. No further work shall be undertaken on the project as long as a stop work is in effect until a decision is rendered by the HPC on the application.
Section 19. Penalties
It shall be unlawful to construct reconstruct significantly alter restore or demolish any building or structure designated as a Landmark or in a designated District in violation of the provisions of this Article. The city in addition to other remedies may institute any appropriate action or proceeding to prevent such unlawful construction reconstruction significant alteration or demolition to restrain correct or abate such violation or to prevent any illegal act business or maintenance in and about such premises including acquisition of the property
1) Any person firm or corporation violating any provision of this division shall be guilty of aclass C misdemeanor punishable by a fine of not less than two hundred and fifty dollars ($250.00or more than two thousand dollars ($2,000.00). Each day the violation continues shall beconsidered a separate offence. Such remedy under this section is in addition to the abatementrestitution.
Section 20. Severability Clause
214
Should any paragraph, phrase, sentence, or clause of this ordinance be determined to be unconstitutional, said determination shall not effect the remaining paragraphs, phrases, sentences or clauses which shall remain in full force and effect.
Section 21. Effective Date
This ordinance shall become effective after passage and publication as required by law.
PRESENTED AND GIVEN first reading the XXth day of ________, A.D. 20__, at a regular meeting of the City Council; and passed and approved on second final reading the XXth day of __________, A.D. 20__, by a vote of X ayes and X nays at a regular meeting of the
_________________________________mayor
215
Level 2: Owners shall submit plans for exterior improvements to residential properties to the HPO.
The owner may then receive a letter of eligibility if the improvements qualify for the program.
Thereafter, owners who make verified exterior improvements (however limited to comprehensive
maintenance and rehabilitation painting, roof, windows, foundation, and siding) consistent with
applicable codes, both historic district and building codes, as applicable, in any 12-month period
beginning with receipt of a letter of eligibility and having a combined cost in excess of $10,000.00,
during that 12-month period, may receive an exemption of 50 percent of the city's ad valorem taxes
for a period of 15 years, as finally determined by applications submitted to the building and
standards commission. Owners may submit additional applications under level 2 during any period
of exemption. If such applications are approved, the exemption period shall be extended from the
date of the last approval. In such event, the exemption periods run concurrently until the earliest
approval expires and continues until the latter approval expires.
(3) Level 3: Owners shall submit plans for improvements to residential properties to the HPO and to
the building permits department. The owner may receive a letter of eligibility, if the improvements
qualify for the program. Owners who make verified exterior improvements (however limited to
comprehensive maintenance and rehabilitation painting, roof, windows, foundation, and siding)
consistent with applicable codes, both historic district and building codes, as applicable, or who
make verified interior improvements to upgrade interior systems to current building codes
(however limited to sanitary sewer lines, fire, HVAC, insulation, electrical, plumbing, or a
combination of interior or exterior improvements) in any 12-month period beginning with receipt
of a letter of eligibility and having a combined cost in excess of $5,000.00, during that 12-month
period may receive an exemption of 30 percent of the city's ad valorem taxes for a period of 15
years, as finally determined by applications submitted to the building and standards commission. If
an owner submits plans for additional improvements under level 2 or level 3 during any period of
exemption previously granted under level 3, such owner, upon approval of the building and
standards commission, shall receive an exemption of 50 percent of the ad valorem taxes for a
period of 15 years from the date of such approval.
(4) Aggregate Cap {per year):The City Council may impose an aggregate cap on the total amount of ad
valorem taxes which would be exempted in any budget year under any or all of the levels set forth
in subsections (a)-(c) of this Section. The annual cap shall be exhausted on a "first come, first
served" basis, as determined by the actual date the city receives a completed application. The cap
shall be a tool to limit any budgetary concerns based on yearly fluctuations in tax revenues, and as
such, the annual cap may be raised or lowered each year by the city council. For calendar year 2016
and continuing annually thereafter until otherwise adjusted by the city council, the aggregate cap
on exempted ad valorem taxes shall be $150,000.00 per year.
(5) Program suspension:The city council may suspend the program at any time.
(6)
217
archaeological, cultural, and historic significance is necessary to promote the economic, cultural, educational, and general welfare of the public.
This act is intended to:
protect and enhance the landmarks and districts which represent distinctive elements of Belton's historic, architectural, and cultural heritage;
foster civic pride in the accomplishments of the past;
protect and enhance Belton's attractiveness to visitors and the support and stimulus to the economy thereby provided;
insure the orderly, efficient, and appropriate growth and development of the City;
promote economic stability and prosperity of the community by encouraging the most appropriate use of historic properties within the City; and
encourage stabilization, restoration, and improvements of such properties and their values by offering incentives for rehabilitation.
29.3. DEFINITIONS
Alteration. Shall mean any exterior change, demolition, or modification to a property with historic overlay zoning, including but not limited to:
1. Exterior changes to or modifications of structures, architectural details, or visualcharacteristics;
2. Construction of new structures;
3. Disturbance of archeological sites or areas; or
4. Placement or removal of exterior objects that affect the exterior qualities of theproperty.
Applicant. The owner of record of a property with existing or proposed historic overlay zoning, the agent or lessee thereof with the approval of the owner of record in a notarized form, or a person holding a bona fide contract to purchase the property with approval of the property owner.
Archeo/ogical resource. A site with archeological or paleontological value in that it has produced or can be expected to produce data affecting theories of historic or prehistoric interest.
Architectural feature. The architectural elements embodying style, design, general arrangement, and components of the exterior of any building or structure, including, but not limited to, the kind, color, and texture of the building materials, and the style and type of all windows, doors, lights, signs, and porches.
Building. A structure for business or residential use, created to shelter people or things, such as a house, barn, church, hotel, warehouse or similar structure, including a historically related
225
complex, such as a courthouse and jail or a house and barn. When separat�d by dividing walls without openings, each portion of such structure so separated shall be deemed a separate building.
Certificate of appropriateness. The certificate issued by the City approving alteration, rehabilitation, construction, reconstruction, or improvement of a property with historic overlay zoning.
Certified local government. A federal government program authorized by the National Historic Preservation Act, 16 U.S.C. 470 et seq., that provides for the participation of local governments in a federal/state/local government partnership.
City. The City of Belton, Texas, as represented by the Mayor and City Council.
Commission. The Historic Preservation Commission created under this section.
Construction. The addition or placement of any improvement to a property with existing or proposed historic overlay.
Contributing. A building, structure, site, or object within a designated historic district which: • embodies the significant physical features and characteristics of the district, or adds to
the historical association, historical architectural qualities, or archeological valuesidentified for the district; and
• was present during the period of significance relating to the documented significance ofthe district; and
• possesses historic integrity or is capable of yielding important information about theperiod.
Dangerous structure. A structure that poses an imminent threat to public health or safety.
Demolition. The complete or partial removal of a building, structure, object, or site, including landscape features and archeological sites.
Demolition by neglect. Improper maintenance, neglect in the maintenance of, or lack of maintenance of any structure or property with historic overlay zoning, which results in deterioration of the structure and threatens the preservation of the structure.
Design guidelines. The "Design Guidelines for Historic Belton, Texas" as adopted by the City Council and as may be amended from time to time.
Designation. The process by which the City Council may designate certain buildings, land, areas, and districts in the City with historic overlay zoning and define, amend, and delineate the boundaries thereof.
Economic hardship. The inability of an owner to obtain a reasonable return or a reasonable beneficial use from a property with historic overlay zoning as required by the United States Supreme Court in Penn Central Transportation Company v. New York City, 438 U.S. 104 (1978) and subsequent decisions. A reasonable economic return does not have to be the most profitable return possible or allow the highest and best use of the property.
226
Historic district. An area of the City containing a grouping of historic p'."operties that are designated with historic overlay zoning and that may contain properties that are both contributing and non-contributing, but that is united historically or aesthetically. For the purpose of this section, the entirety of an historic district shall have historic overlay zoning.
Historic landmark. Any building, structure, object, site, or portion thereof with historic overlay zoning.
Historic preservation officer. The Planning Director or his/her designee who shall serve as the historic preservation officer for the City and who shall oversee the historic preservation program for the City.
Historic resource. Any building, structure, or object with historic overlay zoning being considered for relocation.
Improvement. Any building, structure, or object constituting a physical betterment of real property, or any part of such betterment, including but not limited to streets, alleys, curbs, lighting fixtures, signs and the like.
Initiated designation. The historic designation procedure is considered to be initiated immediately when the City Council, the Planning and Zoning Commission, or the Historic Preservation Commission votes to initiate it or, in the case of initiation by the property owner(s), when the designation report is filed with the Planning Director.
Landscape. Any improvement or vegetation including but not limited to: shrubbery, trees, plantings, outbuildings, walls, courtyards, fences, swimming pools, planters, gates, street furniture, exterior lighting, and site improvements, including but not limited to subsurface alterations, site regarding, fill deposition, and paving.
Low-income homeowner. Any homeowner that meets the U. S. Department of Housing and Urban Development (HUD) qualifications for low income.
National Historic Landmark. A district, site, building, structure, and/or object that has been formally designated as a National Historic Landmark by the U.S. Secretary of the Interior and possesses exceptional value or quality in illustrating or interpreting the heritage of the United States in history, architecture, archeology, engineering, and culture and that possesses a high degree of integrity of location, design, setting, materials, workmanship, feeling, and association. National Historic Landmarks are automatically listed in the National Register.
National Register of Historic Places. A federal list of cultural resources worthy of preservation, authorized under the National Historic Preservation Act of 1966 as part of a national program to coordinate and support public and private efforts to identify, evaluate, and protect the nation's historic and archeological resources. The National Register Program is administered by the Commission, by the state historic preservation office, and by the National Park Service under the Department of the Interior. Significant federal benefits may accrue to owners of properties listed or determined eligible for listing in the National Register.
Noncontributing. A building, site, structure, or object that is located within a designated historic district, but does not add to the historic associations, historic architectural qualities, or archeological values for which the district is significant because:
• it was not present during the period of significance;
227
• it does not relate to the documented significance of the property; and/or• due to alterations, disturbances, additions, or other changes, it no longer possesses
historic integrity and/or is capable of yielding important information about the period.
Object. A material thing of functional, cultural, historical, or scientific value that may be, by nature or design, movable, yet is related to a specific setting or environment.
Ordinary repair or maintenance. Ordinary maintenance shall be defined as any work that does not constitute a change in design, material, or outward appearance, and that includes in-kind (same original material) replacement or repair.
Relocation. Any changes in the location of a building, object, or structure, either within its present setting or to another setting.
Secretary of the Interior's Standards for the Treatment of Historic Properties. A federal document providing standards and guidelines for the appropriate rehabilitation, preservation, restoration, and reconstruction of historic buildings.
Site. The location of a significant event, a prehistoric or historic occupation or activity, or a building or structure, whether standing, ruined, or vanished, where the location itself maintains historical or archeological value regardless of the value of any existing buildings, or objects.
Structure. A work made up of interdependent and interrelated parts in a definite pattern of organization constructed by man. The term includes, but is not limited to engineering projects, earthworks, and bridges.
29.4. HISTORIC PRESERVATION COMMISSION
Number of members, appointment. The Historic Preservation Commission shall consist of five (5) members. Appointment of members shall be made by the City Council.
Make-up of the Commission. A member must be a resident of the City and have lived within the City for a minimum of twelve (12) months immediately prior to appointment.
In making appointments to the Commission, the Council shall attempt to maintain a balance of interest and skills on the Commission by assessing the individual qualifications of the candidates, including, but not limited to, their knowledge and demonstrated interest in preservation-related fields such as architecture, history, archaeology, planning, or urban or community design. All members shall have a knowledge of and demonstrated interest in historic preservation. At least one member shall be an owner-occupant of a property with historic overlay zoning.
Regardless of profession, background, or experience, members of the Commission will require ongoing training and ·education in architectural history, historic preservation law, and other relevant topics. Initial and annual training for new members, as well as an up-to-date reference manual for Commissioners, shall be provided.
Terms. Commission members shall serve for a term of two (2) years, their terms to be staggered, with the exception that for the initial Commission members, the City Council shall appoint the three (3) current members of the Commission for two (2) years, and two (2) new members for a term of three (3) years.
228
The inaugural Commission shall consist of the following members with terms expiring as stated.
Name Jack Folsom Larry Guess Berneta Peeples New member New member
Expiration of Term September 8, 2014 September 8, 2014 September 8, 2014 September 8, 2015 September 8, 2015
Terms of members shall expire on September 8; provided, however, that members shall continue to serve until their successors are appointed.
Vacancies. Vacancies shall be filled by the Mayor, subject to ratification by the City Council, for the unexpired term of any member whose term becomes vacant.
Removal. All members of the Commission shall serve at the pleasure of the City Council and may be removed with or without cause upon a majority vote of the City Council.
Any member who misses three consecutive meetings shall forfeit his or her position, and a replacement shall be appointed by the Mayor, subject to ratification by the City Council, to fill the unexpired term.
Any member may resign by submitting a letter of intent to the City Council.
Election of chair and vice-chair. The chair and vice-chair of the Commission shall be elected by and from members of the Commission.
Compensation. Members shall serve without pay. Members may be reimbursed for actual expenses incurred in the performance of their duties from available funds approved in advance.
Quorum. Three members shall constitute a quorum for transactions of business, and no decision shall be rendered without a concurring vote of at least three members.
Regular meetings. The Commission shall meet at least monthly, if business is at hand.
Special meetings. Special meetings may be called at any time by the Commission chair, vice chair, or at the written request of at least three members, or upon notice from the historic preservation officer or zoning administrator that a matter requires the consideration of the Commission.
Compliance with Texas Open Meetings Act. All meetings shall be held in conformance with the Texas Open Meetings Act, Chapter 552 of the Texas Government Code, as amended.
Rules of Order. The Commission shall follow Robert's Rules of Order or other rules of procedure as determined by the Commission.
229
29.5. RESPONSIBILITIES OF THE COMMISSION
The Commission shall be empowered to:
1. Make recommendations to the City for the employment of professional consultants asnecessary to carry out the duties of the Commission.
2. Adopt parliamentary rules and procedures necessary to carry out the business of theCommission.
3. Adopt criteria for the evaluation of significance of historic landmarks and rules for thedelineation of historic district boundaries, subject to ratification by the City Council.
4. Review and take action on the designation of historic landmarks and the delineation ofhistoric districts, subject to ratification by the City Council.
5. Recommend and confer recognition upon the owners of historic landmarks or propertieswithin historic districts by means of certificates, plaques, or markers.
6. Review and recommend to City Council and other applicable City boards and Commissionsall proposed changes to the zoning ordinance, building code, general plan or other adoptedpolicies of the City that may affect the purpose of the ordinance.
7. Implement and maintain a system of survey or inventory of significant historic, architectural,and cultural properties or resources and all properties located within designated historicdistricts located in the City. Such information shall be maintained securely and madeaccessible to the public, and should be updated at least every ten (10) years.
8. Monitor and report to the Texas Historical Commission all actions affecting any RecordedTexas Historic Landmark, State Archaeological Landmark, National Register property, andany locally designated property, as deemed necessary.
9. Create sub-committees from among its membership and delegate to these committees suchresponsibilities as necessary to carry out the purposes of this ordinance.
10. Maintain written meeting minutes, which are recorded by staff and demonstrate all actionstaken by the Commission and the reasons for taking such actions.
11. Increase public awareness of the value of historic, cultural, and architectural preservation bydeveloping and participating in public education programs.
12. Review and take action on all certificate of appropriateness applications.
13. Review and take action on all appeals on action taken by the historic preservation officerregarding the administrative review of certificate of appropriateness applications.
14. Develop, prepare, and adopt specific design guidelines, subject to ratification by the CityCouncil, for use in the review of all certificates of appropriateness applications.
230
15. Prepare and submit annually to the City Council a report summarizing expenditures, goalsand objectives, and work completed during the previous year, as well as anticipatedbudgetary requests.
16. Make recommendations to the City concerning the utilization of state, federal, or privatefunds to promote the preservation of historic properties within the City.
17. Recommend to City Council the acquisition of historic properties endangered by demolitionwhere their preservation is essential to the purpose of this ordinance and where privatepreservation is not feasible.
18. Propose incentive program(s) to City Council for the owners of historic properties.
19. Review and take action on all City preservation-related incentive program applicationsinvolving work on historic properties, for compliance with adopted "Design Guidelines forHistoric Belton, Texas" pursuant to this ordinance.
20. Recommend whether to accept, on behalf of the City government, any donation ofpreservation easements and/or development rights, as well as any other gift of value for thepurpose of historic preservation, subject to the approval of City Council.
29.6. HISTORIC PRESERVATION OFFICER
The City Manager or its designee shall appoint a qualified City official or staff person to serve as Historic Preservation Officer (HPO). The City may utilize in-house staff or contract using those individuals whose expertise are required to deliberate on specific, related matters. In addition, the planning department will be responsible for coordinating the city's preservation activities with those of state and federal agencies and with local state, and national preservation organizations.
Responsibilities. The HPO shall be empowered to:
1. Administer this ordinance and advise the Commission on matters submitted to it.
2. Maintain and hold open for public inspection all documents and records pertaining to theprovisions of this ordinance.
3. Receive and review all applications pursuant to this ordinance to ensure theircompleteness.
4. Review and take action on all certificates of appropriateness applications subject toadministrative review pursuant to this ordinance.
5. Review and forward with any recommendations all applications for certificates ofappropriateness subject to review by the Commission pursuant to this ordinance.
6. Ensure proper posting and noticing of all Commission meetings, schedule applicationsfor Commission review, provide information packets to its members prior to themeetings, record meeting minutes, and facilitate all Commission meetings.
7. Review and help coordinate the City's preservation and urban design activities withthose of local, state, and federal agencies and with local, state, and nationalpreservation organizations in the private sector.
231
29. 7. CRITERIA FOR DESIGNATION OF HISTORIC PROPERTIES OR DISTRICTS
The Commission shall use criteria for evaluation of significance of an historic landmark or historic district as established by the National Park Service for use in the administration of the National Register of Historic Places. The Commission shall refer to the National Register Bulletin No. 15, How to Apply the National Register Criteria for Evaluation, published by the National Park Service, for further guidance in the application of these criteria.
The following criteria shall be considered in determining whether historic overlay zoning should be applied to an individual property or historic district:
A. Association with events that have made a significant contribution to the broadpatterns of our history.
B. Association with the lives of persons significant in our past.
C. Embodiment of the distinctive characteristics of a type, period, or method ofconstruction, or that represent the work of a master, or that possess high artisticvalues, or that represent a significant and distinguishable entity whose componentsmay lack individual distinction.
D. Archaeological value, in the sense that the property has yielded, or may be likely toyield, information important in prehistory or history.
Additional criteria for designation of historic districts. In addition to the general criteria listed above, the Commission shall consider the following.
Where the designation is made based on the general character of the proposed historic district, these findings may include, but shall not necessarily be limited to:
a. Scale of buildings and structures typical of the area.b. Architectural style typical of the area.c. Architectural period typical of the area.d. Building materials typical of the area.e. Colors used in buildings typical of the area.f. Signage and street furniture typical of the area.g. Landscapes typical of the area.h. Typical relationships of buildings to the landscapes in the area.i. Typical relationships of buildings in the area to the street.j. Setbacks and other physical patterns of buildings in the area.k. Typical patterns of rooflines of buildings in the area.I. Typical patterns of porch and entrance treatments of buildings in the area.
Where the designation is made based on the character of a limited number of specific buildings in the proposed historic district, the findings may include, but shall not necessarily be limited to:
a. Architectural style of the buildings.b. Architectural period of the buildings.c. Textures of materials used in the buildings.d. Colors of the materials used in the buildings.e. Rooflines of the buildings.
232
f. Porch and entrance treatments of the buildings.g. Height and mass of the buildings.h. Relative proportions of the buildings (width to height, width to depth).
Already listed properties. Properties that, as of the date of the adoption of this ordinance, are listed as a Recorded Texas Historic Landmark (RTHL) or State Archeological Landmark (SAL), or that are listed individually or within an historic district on the National Register of Historic Places (NR) shall be considered eligible for designation as historic landmarks pursuant to this ordinance.
The historic preservation officer shall compile a list of such properties and shall initiate an application for historic overlay zoning for each property so identified, pursuant to this ordinance.
The Commission may establish a process by which it identifies additional properties that are so recognized on the National Register or by the State, either on an annual basis or as such properties are listed and that information becomes known to the Commission, and may direct the historic preservation officer to initiate applications for historic overlay zoning for those properties, pursuant to this ordinance.
29.8. DESIGNATION PROCESS
These provisions pertaining to the designation of historic properties constitute a part of the comprehensive zoning plan of the City.
Owners of proposed historic properties shall be notified prior to the Commission hearing on the recommended designation. At the Commission's public hearing, owners, interested parties, and technical experts may present testimony or documentary evidence, which will become part of a record regarding the historic, architectural, or cultural importance of the proposed historic property. The City may designate an historic landmark without the property owner's approval.
The procedure for designating a historic landmark or to establish or amend a historic district may be initiated by the City, or by the individual property owner(s), or by at least 20% of the residents of the potential district. An application for designation shall be made on forms as prescribed by the City and shall be filed with the HPO along with any fees in accordance with the municipal fee schedule. Buildings, structures, sites or areas located within the City which substantially comply with the criteria found in Section 29. 7 may be recommended by the Commission to the City Council as historic landmarks or historic districts. The application shall contain:
• For a proposed historic landmark, the name, address, telephone number of applicant,and physical address of the property.
• For a proposed historic district, the name, address, telephone number of applicant, andno more than 50% negative responses from owners of properties in the proposeddistrict, where a poll has been taken, each property is counted separately, and noresponse is considered an affirmative response.
• Site plan of the proposed landmark property, or map indicating the geographicboundaries of the proposed district, showing all affected buildings and/or structures.
233
• Detailed historic description and background on the proposed landmark or proposeddistrict.
o Current photographs of the overall property or area, along with any historicalphotographs, if available.
o Any other information which the HPO or Commission may deem necessary.
Upon receipt of a completed designation application, the HPO shall schedule a hearing at the next available regularly scheduled Commission meeting. Notice of the application shall be mailed to the property owner(s) and advertised in the official newspaper and/or posted on the property as provided for a zoning change.
A proposed historic landmark or district for which an application for designation has been received shall be protected by and subject to all of the provisions of this ordinance governing demolition, minimum maintenance standards, and penalties until a final decision by the City Council becomes effective, but not to exceed 180 days.
At the hearing, the applicant shall have an opportunity to present testimony and evidence to demonstrate the historical significance or insignificance of the subject property or district. Other interested parties and technical experts may also present testimony or documentary evidence, which will become part of a record. The burden of proof shall be upon the applicant.
The Commission may take action to approve, postpone requesting additional information, or deny the application. The HPO shall forward any final recommendation to the Planning and Zoning Commission within thirty (30) days of the hearing. Denials may be appealed directly to City Council.
The Planning and Zoning Commission shall give notice and conduct its hearing upon receipt of the recommendation from the Commission. Notice for such hearing shall be in the same manner and the hearing held according to the same procedures as specifically provided in the general zoning ordinance of the City. The Planning and Zoning Commission shall review the application to ensure that the recommended designation will not pose a conflict with the underlying land use zoning and shall forward its recommendation to the City Council within thirty (30) days after taking action on the application.
Upon receipt of the joint recommendation on the application from the Commission and the Planning and Zoning Commission, the City Council shall schedule a hearing on the application within thirty (30) days. Notice for such hearing shall be in the same manner and the hearing held according to the same procedures as specifically provided in the general zoning ordinance of the City. Significance shall be considered only on the record made before the Commission and the Planning and Zoning Commission.
Upon designation of a historic landmark or historic district by the City Council, the designation shall be recorded by legal description on the City's official zoning maps, in the records of real property of Bell County, and with the tax appraisal office.
The applicant or any persons adversely affected by any determination of the Commission may appeal the decision to City Council. Appeal requests shall be on forms as prescribed by the City and shall be filed with the HPO within seven (7) days of the Commission's decision and scheduled for the next available regularly scheduled City Council meeting. Notice for such
234
hearing shall be in the same manner and the hearing held according to the same procedures as specifically provided in the general zoning ordinance of the City. Appeals to the City Council shall be considered only on the record made before the Commission, and may only allege that the Commission's decision was arbitrary, capricious, or illegal.
29.9. ORDINARY MAINTENANCE
Nothing in this ordinance shall be construed to prevent the ordinary maintenance and repair of any exterior architectural feature of an historic landmark or a property within an historic district which does not involve a change in design, material, or outward appearance that require the issuance of a building permit. In-kind repair/replacement and repainting is included in this definition of ordinary maintenance unless painting involves an exterior masonry surface that was not previously painted. The HPO shall determine what is "ordinary maintenance."
29.1 O. MINIMUM MAINTENANCE STANDARDS
No owner or person with an interest in real property designated as an historic landmark or a property located within an historic district shall permit the property to fall into a serious state of disrepair so as to result in the significant deterioration of any exterior architectural feature which would, in the judgment of the Commission, create a detrimental effect upon the historic character of the landmark or district.
Examples of serious disrepair or significant deterioration include:
(a) Deterioration of exterior walls, foundations, or other vertical support that causesleaning, sagging, splitting, listing, or buckling.
(b) Deterioration of external chimneys that causes leaning, sagging, splitting, listing, orbuckling.
(c) Deterioration or crumbling of exterior plaster finishes, surfaces or mortars.
(d) Ineffective waterproofing of exterior walls, roofs, and foundations, including brokenwindows or doors.
(e) Defective protection or lack of weather protection for exterior wall and roof coverings,including lack of paint, or weathering due to lack of paint or other protective covering.
(f) Rotting, holes, and other forms of material decay.
(g) Deterioration of exterior stairs, porches, handrails, window and door frames,cornices, entablatures, wall facings, and architectural details that causesdelamination, instability, loss of shape and form, or crumbling.
(h) Deterioration that has a detrimental effect upon the special character of the district asa whole or the unique attributes and character of the contributing structure.
(i) Deterioration of any exterior feature so as to create or permit the creation of anyhazardous or unsafe conditions to life, health, or other property.
235
29.11. DEMOLITION BY NEGLECT
Demolition by Neglect refers to the gradual deterioration of a property when routine or minimum maintenance is not performed. The HPO and the planning department staff shall work together in an effort to reduce Demolition by Neglect involving properties with historic overlay zoning. A Demolition by Neglect citation as determined by the Commission may be issued against the owner of the property for failure to comply with the minimum maintenance standards by permitting the subject property to exhibit serious disrepair or significant deterioration as outlined in Section 29.10 herein.
1) While the HPO will act as the point of contact, the planning department staff shall, whenneeded, assist with inspections. If there is a dispute between the HPO and planningdepartment staff, the City Manager shall make the final determination.
2) The procedure for citing a property owner for Demolition by Neglect shall be as follows:
(a) Initial identification is made by visual inspection of the area by the HPO or a Commissionmember or by referral from someone in the area. All referrals shall be made in writing andshall be submitted to the HPO.
(i) Once the initial identification is made, followed by a preliminary determination by theHPO, the property owner shall be notified by U.S. mail of the defects of the building andinformed of any incentive programs that may be available for repair. The owner shall begiven thirty (30) days in which to respond to the preliminary determination by submittinga stabilization proposal to the HPO. The stabilization proposal will be presented to theCommission at the next available meeting. If the Commission approves the proposal, acertificate of appropriateness (if necessary) may be issued administratively by the HPO.The approval will detail the specific work that is necessary to correct the Demolition byNeglect conditions, as well as a time period to begin and complete the work. The HPOshall update the Commission on the status of the property every thirty (30) days, oncework begins on the property.
(ii) If the property owner receives the letter regarding the preliminary determination, butfails to respond, a second notice shall be sent in the same manner as described above.
(iii) If the property owner fails to receive and/or respond to the letter regarding thepreliminary determination after two (2) attempts, the matter returns to the Commissionfor a citation hearing. The HPO shall send a third notice via certified mail informing theowner of the hearing, the property shall be posted with a notice of the violation inaccordance with the provisions of this Ordinance, and a public hearing on the citationshall be scheduled.
(iv) At the public hearing, the owner will be invited to address the Commission'sconcerns and to show cause why a citation should not be issued. The Commission maytake action to approve any proposed work, defer the matter to give the owner more timeeither to correct the deficiencies or make a proposal for stabilization, or issue a citationto the owner of the property for failure to correct the Demolition by Neglect conditions.
(v) If the owner is cited for the condition of Demolition by Neglect of the property, heshall be given fourteen (14) days to submit a stabilization proposal to the HPO, and at the discretion of the Commission, up to one (1) year to correct the defects. The HPO
236
shall update the Commission on the status of the property every thirty (30) days once work begins on the property.
(vi) If the owner does not respond with a stabilization proposal, the matter shall beturned over to the City Attorney's office for recommendation to the City Council for legalaction.
(3) The City may create programs, or enter into partnerships with local non-profit organizations,to assist low-income and/or elderly homeowners with maintenance.
29.12. CERTIFICATES OF APPROPRIATENESS
(a) Applicability. A certificate of appropriateness shall be required in the followingcircumstances before the commencement of development within or work upon anyproperty with historic overlay zoning:
(1) Whenever such work or development requires a building permit or certificate ofzoning compliance issued by the City;
(2) Whenever such work includes the erection, moving, demolition, reconstruction,restoration, or alteration of the exterior of a property with historic overlay zoning,except when such work satisfies all the requirements of ordinary maintenanceand repair as defined in Section 29.3, definitions.
(b) Certificate of appropriateness required. No building permit shall be issued by the buildingofficial for any property with historic overlay zoning until the application for such permithas been reviewed and a certificate of appropriateness has been approved by the HPOor the Commission.
(c) Procedures.
(1) After an application for a certificate of appropriateness is submitted, the HPO shalldetermine whether the application shall be eligible for administrative review or theapplication shall be considered by the Commission.
(2) An application shall be eligible for administrative review by the HPO for the following:
a. Paint colors for the exterior of a structure including siding, trim, doors, steps,porches, railings, and window frames. This shall not include painting orotherwise coating previously unpainted masonry;
b. The placement and screening, if necessary, of roof-mounted equipment andother mechanical equipment of various types;
c. The placement and design of screening treatments for trash and recyclingreceptacles;
d. Fences to be installed in the rear and/or side yard;
e. Ground lighting;
237
f. Elements attached to a facade of any building, garage or carriage houseincluding, but not limited to door hardware, hinges, mailboxes, light fixtures,sign brackets, street address signage and historic interpretive signage.
g. Replacing roofing materials or color on a flat roof that will not be visible fromthe ground or from immediately adjacent taller buildings;
h. Gutters and downspouts;
i. Installation or removal of landscaping, including trees;
j. Accessibility ramps;
k. Changes to awning fabric color for an existing awning;
I. Landscape elements, including but not limited to walks, paving, benches,outdoor furniture, planters, pools, trellises, arbors and gazebos;
m. Installation of any elements required by other codes such as emergencylighting;
n. Modifications that are considered non-permanent such as, but not limited to,window films and temporary features to weatherize or stabilize a historicresource;
o. Minor modifications to an existing certificate of appropriateness that stillmeets the intent of the original approval;
p. Renewal of an expired certificate of appropriateness.
(3) If an application for administrative review is approved or approved with conditions,the HPO shall issue a certificate of appropriateness pursuant to section (d) below.
(4) If the HPO: forwards the application to the Commission because it does not meet thecriteria in subsection (2) above, does not act on the application within ten (10)business days of receipt of the complete application, disapproves the application, orthe applicant wishes to appeal the administrative decision or associated conditions ofthe certificate of appropriateness application, the Commission shall consider theapplication. An appeal to an administrative decision shall be filed with theCommission within ten (10) business days of said decision.
(5) If an application is to be considered by the Commission, the HPO shall inform theapplicant of the meeting date at which the application shall be considered. Theapplicant shall have the right to be heard and may be accompanied or representedby counsel and/or one or more construction or design professionals at the meeting.
(6) The HPO shall review the application and make a recommendation to theCommission during the meeting at which the application shall be considered.
238
(7) After hearing the applicant and any other interested parties, and considering therecommendation from the HPO, the Commission shall take one of the followingactions:
a. Approve the proposed work or development and issue a certificate ofappropriateness.
b. Approve the proposed work or development with conditions and issue aconditional certificate of appropriateness.
c. Disapprove the certificate of appropriateness.
(8) In the case of the disapproval of a certificate of appropriateness by theCommission, the Commission shall state in writing the reasons for suchdisapproval and may include suggestions in regard to actions the applicant mighttake to secure the approval of the Commission concerning future issuance of acertificate of appropriateness.
(d) Certificate.
(1) It shall be the responsibility of the HPO to issue the actual certificate ofappropriateness following administrative approval or approval by the Commissionwith any designated conditions, and to maintain a copy of the certificate ofappropriateness, together with the proposed plans. These shall be publicdocuments for all purposes.
(2) Work performed pursuant to the issuance of a certificate of appropriateness shallconform to the requirements of such certificate. It shall be the duty of the buildingofficial to inspect from time to time any work performed pursuant to a certificateof appropriateness to assure such compliance. In the event that such work is notin compliance, the building official shall issue a stop work order and/or citation asprescribed by ordinance. The Commission may request that the building officialinspect the work and issue a stop work order.
(e) Criteria. The HPO or the Commission shall determine whether to grant a certificate ofappropriateness based on the following criteria:
(1) The effect of the proposed change upon the general historic, cultural andarchitectural nature of the historic property or historic district;
(2) The appropriateness of exterior architectural features, including parking andloading spaces, which can be seen from a public street, alley or walkway; and
(3) The general design, arrangement, texture, material and color of the building orstructure and the relation of such factors to similar features of buildings orstructures in the historic district, contrast or other relation of such factors to otherbuildings or structures built at or during the same period, as well as the
239
uniqueness of such features, considering the remaining examples of architectural, historical and cultural values.
(f) Guidelines. In all of its determinations of architectural appropriateness and historicalintegrity in the design and construction of historic properties or signs, the HPO or theCommission shall use the most recent edition of the book entitled, "The Secretary of theInterior's Standards for the Treatment of Historic Properties: With Guidelines forPreserving, Rehabilitation, Restoring and Reconstructing Historic Buildings", attachedhereto as Exhibit "A" for reference, or any future publication which replaces this book,and the following criteria as guidelines:
(1) Every reasonable effort shall be made to provide a compatible use for a propertythat requires minimal alteration, or to use a property for its originally intendedpurpose.
(2) The distinguishing original qualities or character of a historic property and itsenvironment should not be destroyed. The removal or alteration of any historicmaterial or distinctive architectural features should be avoided when possible.
(3) All historic properties shall be recognized as products of their own time.Alterations that have no historic basis and which seek to create an earlierappearance shall be discouraged.
(4) Changes that may have taken place in the course of time are evidence of thehistory and development of an historic property and its environment. Thesechanges may have acquired significance in their own right, and this significanceshall be recognized and respected.
(5) Distinctive stylistic features or examples of skilled craftsmanship thatcharacterize a historic property shall be treated with sensitivity.
(6) Weakened architectural features that are found in kind are to be repaired ratherthan replaced, wherever possible. In the event replacement is necessary, thenew material should match the material being replaced in composition, design,color, texture and other visual qualities. Repair or replacement of missingarchitectural features should be based on accurate duplications of features,substantiated by historic physical or pictorial evidence rather than on conjecturaldesigns or the availability of different architectural elements from otherproperties.
(7) Surface cleaning shall be undertaken with the gentlest means possible.Sandblasting and other cleaning methods that will damage the historic buildingmaterial shall not be undertaken without approval from the Historic PreservationCommission.
(8) Every reasonable effort shall be made to protect and preserve archeologicalresources affected by or adjacent to any project.
(9) Contemporary design for alterations and additions shall not be discouraged whensuch alterations and additions do not destroy significant historic, architectural, orcultural material and when such design is compatible with the size, scale, color,
240
material, a character of the property, neighborhood or environment. Wherever possible, new additions or alterations shall be done in such a manner that if such additions or alterations were to be removed in the future, the essential form and integrity of the historic property would be unimpaired.
(g) Supplemental guidelines. The HPO or the Commission may develop, and the CityCouncil may approve, such supplemental guidelines as it may find necessary toimplement the regulations of historic overlay zoning or the findings applicable to thedesignation of a particular historic property. Such guidelines may include, but are notlimited to the following:
(1) Charts or samples of acceptable materials for siding, foundations, roofs, or otherparts of buildings;
(2) Illustrations of appropriate architectural details;
(3) Specifications of appropriate relationships to streets, sidewalks, other structures,and buildings;
(4) Illustrations of appropriate porch treatments or entrances; or
(5) Illustrations of appropriate signage or street furniture.
(h) Certificate of appropriateness for demolition.
(1) Certificate required. No historic property shall be demolished or removed unlesssuch demolition shall be approved by the Commission and a certificate ofappropriateness for such demolition shall be granted.
(2) Procedure.
a. The procedure for issuance of a certificate of appropriateness fordemolition shall be the same as for the issuance of other certificates ofappropriateness with the following modification.
b. After the hearing, the Commission may approve the certificate ofappropriateness, thereby authorizing the demolition, or the Commissionmay disapprove the certificate of appropriateness and postpone thedemolition or removal for a period of one hundred and twenty (120) days.The purpose of such a postponement would be to allow the Commissionand any interested parties to explore alternatives to demolition.
c. The Commission may extend the postponement period for an additionalsixty (60) days in order to enable the completion of ongoing negotiations.
d. Notwithstanding any provision of this ordinance, the City Council reservesthe right to prohibit the demolition of a landmark structure with six (6)affirmative votes.
241
(3) Supplemental demolition criteria. In determining whether to issue a certificate ofappropriateness for demolition, the Commission, and, on appeal, the CityCouncil, shall consider the following criteria, in addition to the criteria specified inthis section:
a. The uniqueness of the property as a representative type or style ofarchitecture, historic association, or other element of the originaldesignation criteria applicable to such structure or tract.
b. The condition of the property from the standpoint of structural integrityand the extent of work necessary to stabilize the property.
c. The economically viable alternatives available to the demolition applicant,including:
1. Donation of a part of the value of the subject structure or site to apublic or nonprofit agency, including the conveyance ofdevelopment rights and facade easement.
2. The possibility of sale of the property, or any part thereof, to aprospective purchaser capable of preserving such property.
3. The potential of the property for renovation and its potential forcontinuing use.
4. The potential of the property for rezoning in an effort to rendersuch property more compatible with the physical potential of theproperty. The ability of the property to produce a reasonableeconomic return on investment for its owner; provided, however,that this factor shall not have exclusive control and effect, but shallbe considered along with all other criteria contained in this section.
(i) Certificate of appropriateness for relocation.
(1) Certificate Required. No historic resource shall be relocated unless suchrelocation shall be approved by the Commission and a certificate ofappropriateness for such relocation shall be granted. For the purposes of thissubsection concerning relocation, the term "historic resource" shall be used todescribe an individual building, structure, or object designated according to theprocedures in Section 29.8.
(2) Procedure. The procedure for issuance of a certificate of appropriateness forrelocation shall be the same as for the issuance of other certificates ofappropriateness with the following additions.
a. If the historic resource is a Recorded Texas Historical Landmark or listedon the National Register of Historic Places, the applicant shall be requiredto notify the appropriate party at the Texas Historical Commission andreceive a response in writing, prior to submitting an application for the
242
relocation to the Historic Preservation Commission.
b. Documentation shall be provided to the Commission at the time ofapplication for a certificate of appropriateness that provides the followinginformation:
1. Overview of the proposed relocation of the historic resource,including:
(a) Reasons for relocating the historic resource; and
(b) Reasons for selection of destination site.
2. Photographs, which document all aspects of the historic resource.Requirements for photographs shall be provided by theCommission. At a minimum, photographs provided by theapplicant shall include but are not limited to:
(a) Each elevation of the building;
(b) Street view;
(c) All prominent architectural features; and
(d) Any additional accessory buildings that also have historicoverlay zoning, showing how they relate �o the primarystructure.
(e) Requirements for photographs shall be maintained andprovided by the Commission.
3. Site plan of historic resource in current location.
4. Site plan of historic resource in new location.
c. Public notices of the proposed relocation shall be required as follows:
1. Signed notice. Within five (5) business days of receipt of anapplication for a certificate of appropriateness for relocation, theCity shall post a sign showing notice of the application on theoriginating location and on the proposed destination location, forthe purpose of notifying the public of the proposed relocation.
2. Mailed notice.
(a) Ten (10) business days prior to the Commission meetingwhen the application will be heard, writte:, notices shall bemailed to each owner, as indicated by the most recentlyapproved City tax roll, of real property within 300 feet of the
243
existing property with the resource proposed for relocation and 300 feet of the proposed new location. Notice may be served by its deposit in the U.S. Mail in the City, properly addressed with postage paid.
(b) Mailed notices shall contain at least the following specificinformation:
(1) The general location of land that is the subject ofthe application and/or a location map;
(2) The legal description or street address;
(3) The substance of the application;
(4) The time, date and location of the HistoricPreservation Commission meeting;
(5) A phone number to contact the City; and
(6) A statement that interested parties may appear atthe hearing.
d. When a historic resource is relocated to a new site, the historic resourceshall retain the historic overlay and therefore continue to be subject to therequirements of a certificate of appropriateness.
(3) Supplemental relocation criteria. In determining whether to issue a certificate ofappropriateness for relocation, the Commission, and, if necessary, on appeal, theCity Council, shall consider the following criteria, in addition to the criteriaspecified in this subsection:
a. The historic resource is imminently threatened by demolition or removalof historic overlay zoning.
b. Reasonable alternatives have been examined to mitigate the threat to thehistoric resource, in lieu of relocation. Alternatives may include, but arenot limited to:
1. Modification of the proposed project affecting th3 historic resourceto avoid its impact on the location of the historic resource.
2. Incorporation of the historic resource, in its entirety, into theproposed project that would affect the location of the historicresource.
c. When relocated, the historic resource shall remain in the City of Belton.
244
d. The structural condition of the historic resource has been examined so that it has been determined that the historic resource may be moved andthat damage to the historic resource which would result from the movecan be minimized. Stabilization of the historic resource prior to and/orduring the move may be required.
e. A new location for the historic resource has been determined that wouldbe compatible with the architectural aspects of the historic resource, tothe extent possible. Consideration shall include the review of all of thefollowing:
1. Size of the resource and destination lot;
2. Massing;
3. Architectural style;
4. Review of all adopted design guidelines by the Commission indetermining compatibility; and
5. Other historic resources, which are not the primary resource onthe site, but are historically associated with the primary resource,also should be relocated, if possible, and may be considered forrelocation with the primary resource on the same certificate ofappropriateness
f. Any historic resource relocated pursuant to this section shall be requiredto conform to any siting conditions at the new location. These sitingconditions shall include, but are not limited to, setback requirements,structural alteration requirements such as enclosed parking requirements,and architectural requirements such as exterior finishes and orientation.
g. The applicant agrees to the following additional conditions of thecertificate of appropriateness:
1. The historic resource shall be secured from vandalism and otherdamage for the time that it remains vacant as a result of therelocation process.
2. The applicant shall be required to display a plaque, provided andpaid for by the City, which documents the historic resource'soriginal location, date of relocation, and reason for relocation.
3. The historic overlay shall convey with the historic resource to itsnew location.
4. The historic overlay shall be removed from the originatingproperty, unless one of the following applies:
245
(a) The property is located within an historic district; or
(b) Only an accessory structure has been moved and the
primary structure on the site remains; or
(c) The site itself is historically significant.
5. The City may apply the historic overlay to the destination lot(s), byfollowing the procedures for applying historic overlay in Section29.8 of the code. If the historic resource is being moved into analready designated historic district, the historic overlay shallremain and apply to the destination lot or lot(s).
6. The applicant shall provide photographs to the HPO of therelocated historic resource once relocation is complete.
7. Information regarding the relocation shall be filed in theappropriate City and county records.
(4) Fee Waivers. If a certificate of appropriateness for relocation has been approvedby the Commission, the following fees shall be waived:
a. Building moving and permits fees
b. Notice requirement fees.
U) Appeals. Appeals of certificate of appropriateness decisions made by the Commissionshall be made within fifteen (15) days to the City Council.
29.13. ECONOMIC HARDSHIP
No certificate of appropriateness for demolition involving a claim of economic hardship may be approved, nor shall a demolition permit be issued by the City unless the owner proves compliance with the following standards for economic hardship:
(a) The property is incapable of earning a reasonable return in its current orrehabilitated state, regardless of whether that return represents the mostprofitable return possible; and
(b) The property cannot be adapted for any other use, whether by the current owneror by a purchaser, which would result in a reasonable return; and
(c) Earnest and reasonable efforts to find a purchaser interested in acquiring theproperty and preserving it have failed; and
(d) The property cannot be moved or relocated to another site similar site or withinthe District.
246
1) The City shall adopt by resolution separate criteria for review in considering claims ofeconomic hardship for investment for income-producing and non-income-producingproperties, as recommended by the Commission. Non-income properties shall consist ofowner-occupied single-family dwellings and non-income-producing institutional properties. Allstandards for review shall be made available to the owner prior to the hearing. Theinformation to be considered by the City may include, but not be limited to, the following:
(a) Purchase date price and financing arrangements
(b) Current market value
(c) Form of ownership
(d) Type of occupancy
(e) Cost estimates of demolition and post demolition plans for development
(f) Maintenance and operating costs
(g) Inspection report by licensed architect or structural engineer having experienceworking with historic properties
(h) Costs and engineering feasibility for rehabilitation
(i) Property tax information
0) Rental rates and gross income from the property
(k) Other additional information as deemed appropriate
2) Claims of economic hardship by the owner shall not be based on conditions resulting from:
(a) Evidence of demolition by neglect or other willful and negligent acts by the owner
(b) Purchasing the property for substantially more than market value at the time ofpurchase
(c) Failure to perform normal maintenance and repairs
(d) Failure to diligently solicit and retain tenants
(e) Failure to provide normal tenant improvements
3) Throughout the process, the applicant shall consult in good faith with the HPO, localpreservation groups, and interested parties in a diligent effort to seek an alternative that willresult in preservation of the property. Such efforts must be demonstrated to the Commissionat the hearing.
247
29.14. ENFORCEMENT
All work performed pursuant to a certificate of appropriateness issued under this ordinance shall conform to any requirements included therein. It shall be the duty of the building inspector to inspect periodically any such work to assure compliance. In the event that work is not being performed in accordance with the certificate of appropriateness, or upon notification of such fact by the Commission and verification by the HPO, the building inspector shall issue a stop work order and all work shall immediately cease. The property owner shall then be required to apply for a hearing before the Commission to explain the non-compliance. No further work shall be undertaken on the project as long as a stop work order is in effect until a decision is rendered by the Commission on the application.
29.15. PENAL TIES
It shall be unlawful to construct reconstruct, significantly alter, restore, or demolish any building or structure designated with historic overlay zoning in violation of the provisions of this ordinance. The city, in addition to other remedies, may institute any appropriate action or proceeding to prevent such unlawful construction, reconstruction, significant alteration, or demolition to restrain, correct, or abate such violation or to prevent any illegal act, business, or maintenance in and about such premises, including acquisition of the property
Any person, firm, or corporation violating any provision of this ordinance shall be guilty of a Class C misdemeanor, punishable by a fine of not less than two hundred and fifty dollars ($250.00) or more than two thousand dollars ($2,000.00). Each day the violation continues shall be considered a separate offence. Such remedy under this section is in addition to any abatement restitution.
SECTION Ill: SEVERABILITY CLAUSE. Should any paragraph, phrase, sentence, or clause of this ordinance be determined to be unconstitutional, said determination shall not affect the remaining paragraphs, phrases, sentences, or clauses, which shall remain in full force and effect.
SECTION IV: EFFECTIVE DATE. This ordinance shall become effective after passage and publication as required by law.
PASSED AND APPROVED at a regular meeting of the City Council of the City of Belton, Texas, this 26th day of June, 2012, at which meeting a quorum was present, held in
accordance with the provisions of V.T.C.A., Govern nt Code, 1.001 et seq.
-
R PRO TEM
�� Connie Torres, CITY CLERK
248
The Secretary of the Interior's Standards for the Treatment of Historic Properties
with Guidelines for Preserving,�ehabilitating,Restoring c&Reconstructing Historic Buildings
Kay D. Weeks and Anne E. Grimmer
U.S. Department of the lnterior National Park Service Cuhur2I Resource Stcw.u'd.ship and Partnc:nhips Heritage Preservation Service, Wuhington, D.C. 1995
Contmts
Ad.n""'1edgm>mts. . . . . . . . • . . .. ........................................................ .
lrittod\JCtion .....................•........................ •-··-···· ···········•·
Omculn� 211 Appropri11t T l"Ciitmc1u fCH" 1hc Hi.stork lluildin.t-..... , .. , . , ...... , .. , . , , , ... • , , I
lhing fhc Sa.n.datds-and Cuiddina: fut 1 l1mcrv.ttion, Rt�hil,tanon. Roz:onrion. or Rtton51l1Jcrion Project ............... , .. , ... , - ..... , .. , .. .
Hu<o<i,,,i O,..,.;.,.r Buildm, M,m,,b • l\uild;nc f.,,iun, • s;,. • S<mng • Spcci,J llequimncoa .•.... 3
Su..i.tds fo, l'oa,r,,auon aod Guiddina fo, � Histari< &;ldinp .......•........•....... 17
lnnoduebOn ..•...........•.....•..•...••.........•.••.•.••...•.....•... , ••.•...•..... 19
�=�.�7:�=�::::::::::::::::::::·:::::::·:::·:·:·:·:·:·:·:·:·:·:·:·:':·:·:·:·:·:·::·:·:·:·::::::::::HArchi""""'1Mmb ..................................................................... ?';/
:=t�.�·��'."'.:.::·:::::::::::::::::::::::::::::::::.·:.·.·.-.·.·:::.·.·.·.·.:::::::::::!; Window, .............................................................................. 35 Enuincci and Poti:.ha., .. , .. , .. , ..••.. , .. , ....• ,,., .•.. ,.,, .•.. ,.,,,,.,,.,.,,, ·,,,, .. , .•.. .,._ Storefronts ..........•....•........................ ,., .. , ...... , ...... , .. , .............. �o
E:�€f ·;��;:i:·::::::;;;;;::;;:::;:ii:'i:':':'i:iii:·i:·:·:·:·:·:·:·:·:·:·:·::::::::;:::::�! l!wlding Si10 ........................................... , ............................. 51
S<t1ing (Ducrict/Ncighl,orl-,d) .............................................. , ........... 54
��fii�::::::;:::::::::::;;;):;;)·;;:·)·i:.iiiiii:'i:·:::::::::::j
250
Sun.dud,;; fur Rc�bih1a1.r:>n and GWddlnu fut Rd\ll»licarfflg Hmonc Bu,ldJnp _ , ..•..•••..••..•.. 61
Ln11nd1J.ttion ••.•.•••.....••..•.• , •••••••.••. , .. , •.•...•••.••.••.••.••..••.• , •.•..••••• 63
Bu�ding Ea.terior: Ma1emts .....•.••..•..•.••....•..•..••••.•.•...•••••..••.•.. , .•.• , .... 67 Miuonry ,, ... , .... ..•...•.••...... •••••·•·•············•·············· ,, .... . . . . G.7 Wood ....................... ........................................... ... , . ... . 71 Archil«tur,IM.."tlb ..•.••.•......••.••••••.•••......• ....................... .•.. ... S
Building &r:cri.ot; mru� ........ , •......•. , •....•... , ..••....•...•... , ....•. , •....•.•. 71 11,,ol,................ . .. . . .... . . . . . . . . . . . . • . . . . . . . . . .. . . . . . ... ... ' ... 7J w...i-. .......... , ................. .. ...... .. .... .. ......... .. ......... ,. 81 tlltn.ntts �nd Pof,:11('$, ••• •• ••••• • , • • • • • • • • • • • . • • • ••• , , • • • • • • • , , • , • 85 5,of\4fonu. . • • . . . . , . . . . • . • . . •. , . , • . . • . . • . • • , . . . . . • . . • .••.• , . • . • • . . • . . • . • . . . . 88
Butl<ling lnt<tio-r •.•.....••.•••.•••.••••..••.••••.•.••••••••••••.•••••••••••••••••.•••. !) I Sttuctu�! Sy,tcnu,. . . • . . • . • • . . • . . , • . • . •. , . . . . . . . . . • . . . . . • . • . . . • . • . . . 91 Spaces. l�run:J. and FinUhcs . . . . . . • . . . • . . . . . . . • . , ...• , • . . . . . . . . . . . , , , • • . , . , 94 Mcdl:ilnici.1 Syucnu., ..... , ............... .. .. , . . . . . .. .. .. .. •• .• .. • • . • . • .. .. 100
Building Si« ..........................•........•.............•..••........•.. , •..... 102
Setting (D,.,ric:i/ dghborhood) ...................................... , ....... , . .. . . • • • • lOG
Sp«ul Requittme11u ............................................................... , .. 110 �:nc,p- Efficiency. .. . . . .. . . . .. . .. . . .. • .. • .. . . • . • . . • . .. . . . .. • . .. . .. • • .. • .. . . . • .. . . , 110 New AdditioN to HU:tork Buijdins, ••.•. , •... , , , •.....• , ... , •. , ...• , . . . . . • . . , .....•. 112 Ac:ceuib,lity Con.side-rations ••.• , . • ...• , ••.• , ••... ..•• , •••••..•.• . , ••••• ••••••. , •• , i I� Health a.nd S=afc1y Caruidcnirions. , . . . . . . . . , , • . •.•. , . . . • . . . . . . . . • . . • . • . . . . .• , . . 115
Snl\dvds for Rutoracion. and CuMlclincs £or lw:roring HiHorLC Build1r.gs ..••...•• , .....• , ...•... 117
lntrodLKrion ......•..•...•..•..•....•.•....••......•.....•...•..••••....•....••..•.•. 119
Bu�ding &tenl)r: Mace:� .•.•. , .........•.•..•.•...... , .••.......•••.•... , ....••....•. 12:Z M"'°"ry • , . . . . . .. . . . . .. • . . . . .. . . . . . • . . • . .. • • • • • . . .. . • .. . • . . . .. • • • . 122 Wood......... .... .. .... ....... ........ ... ... . .. . ..... .... .. .... . . .. ...... .127 An:h1rcct\H'111iMcr.cls ..... , .• •• ,, .•.••.••• ,.,., ••.•••.•.••.. , •...•. ••• , , ••• , .•.•• • 131
n -
Building Eumor. 1u,u,.. ............................................................. m Koo6..... . . . . . . . . . . . . . . . . . . . . • . • .. .. .. . . . , ......................................... 13) Window,, ••. . , ••••.••••.••••.•• , •• •· ••..•••.••.•.•••••.••••.•••..•••••••••••••••..•. 137 Entnnec,an,ll'o«hc,.,, .......•.•.... , ..••..•.....•...•.••.. , ......•...•• , •...•.....•.. 140 Sto�n ..... , ... ... , , ........... , ....................................... , ......... 141
Buildinc l,u,rio, ....................................•....•...•...•......•...•........ 145 Saucruc,.I Symms .....••••............•.. , ..•.........•.••..... , ..••.•....•••• , ........ HS Sp,c:a, FnNre,. •nd l'inuhc, ............................................. , •.. ., ....•...•. 147 Mcd,.,nialSymm, ..................................................................... ISi
Building Site , ........... , ....................................................... , .•. ISJ
S..ti<>g(l)(cuic,/Ncig!,l,o,hood) .... , .......••.......••..•.•... , ................. , .•..... 157
Spoci.,!�""'"'""··················•············•··································160 En<l&Y Effickncy, ....... , ••.• , • , ................. .......................... " •••••• ,. 160 AccmibmryC.onsidcrarions .•..•.. , .. , ......... , .•. , .•.•.•...... , ..•...••....•..•. ,. , , ... 162 Hcahh ,od S,i.ty Co,u;dc:,-,riom. . . . • . • . • • . .. • • • • . . . .. . .. .. • • • .. • . . • • • • • • .. .. • • • .. • • • .••• 163
St� fat R.ccoruitn.lCtion mdi Guidelines fur Rcalpurua,ing tihto,ic 8uild.tn:g.a. , •..•.....•.. , .• 1(;5
lnuod�n .•.••................• , •••...•.•.......•.•..•...•...•..•.•....•.••....•.. 167
�tth and DocUA'1.eru:9tion • , • , • , ••••••••••• , ••••••• , ••••••• , •••• , •.• , , •••••••.•.••••• l 70
8,.;lding Enaiot.. . . . . . . . . . . . . . . . . . . . . . . . . . . . ..........•.. , ....•.. , ................. 172
BuiJ.di:n.gln1erior •..•••..•••.••••••••••••..•••.•••••.•••.•••••••••.•.••••.•..••.•••••• 1n
Building Si« .....•... , ....•.. ,., ...•...•.....•........••.... ,, ......•..•... : .•...... 174
Smins COis1ri«!NNghho.-hoodl . • • . . • . . • . . • . . • • . . . . . • • . • . . • • . . • . . . . • • . • . • • . • . . . . ........ 17)
Speeia1 Rcqui1:tmc:nu .••.••.••..••.••.•••...• , ••••.••...••..••.•••••••. , .••.•.•.•.••• , . 117 Enc,gy Ellici<ncy. .. . .. • ... , ........................................... , ............... 1n A=ssiboli!y Coruid,,.,..,. .. . • . . . . . . . . . . .. . . .. . . • . .. ..•. , ••.•....... , . .. . • • . .. . .... 177 Hc-aldt and 5ah:ryConsidcnnoN , . , .• , .. , ..•. , ........•• , , .. , ..•. , • , , . , .. , • , .•.. , ..... 177
Tci::hniat G�id'lncc Publica.1ions .••.•••.• , ••••••• , •.•••..••••.•.•••• ,., •••..•••••• , ..•••• 17Y
251
Photo Credits
Fro,it a11d Bn& Co&lffl'
&ngor Ho,ut, &ngor. Mttint, cif'C.1 1880. Histo,ic phom (fronr) :md drawing (back): Courtesy, Maine Stare Historic Pl"C$crvation Offitt.
HiJtorienl Owr11i�w (M11tni1tls ,u1d htttur:1)
/Juiklinx &trrior: MmamJ Jack E.. Boucher, HARS.
/Jui/dint. Ex1"U,r: Wood Jack E. Boucher, HABS.
Buildinx Extuior: Arrhittctuml Mt111h. Cervin Robinson, HA.HS.
IJuil.dinx b:r,rior: R«,Ji. Jack E. &ud,cr, HAHS.
Building F.xtrrio,� Windowi. Jack E.. Boucher, HABS,
&i1"int &urior. £ntrnnca nnd l'orrhn. Jack E.. Boudlcr, HASS.
H11i/di11J_ F.xurior: Slorefronts. Jick E. Boucher, HAHS.
Building lnttrior: Structuml S,sttnu. Cervin Robinson, HABS.
/J11ildint lnurior: Sµm, Fttttura ttnd Finisha. Brooks Photographers, HA.BS Collection.
Rui/Jint lnttrio,-: M«htruiClt! Sj11tnu. Nuional lla.rk Service l-iks.
Building Siu. J:,,ck E. Boucher, HAHS.
&ttint (DiJrrkt/NtithbarlNJOd). Ch•rlcs Ashron.
Ennv Cansmmtion. Laun A. Muckenfuss.
Ne11,1 Additiom to HiJtorit /Jui/mi,p. Rodney G.try.
AC't't11ibilily Q,uidemrions. l)cp,utmcnt ofCulrur:il Resources, N..tlcigh, Nosth Carolina.
HMhh 11nd Snft,y Considtmsions. N1tional 1'2rk Service Files.
()
O,apt,r Heads
�" Hilk Howe, US Anplts. CrUfomin. Photos: Before: National l'ark Service files; After: Bruce Bochnct
Rd,,,bilintiou Stortfront, Painltd /1011, New }&,k 11for rthisbililation. Phot0: Kdlogg Srudio.
Rator,UU,11
Clln,ron-St11nford Hous,, °'1k"1,ul, GtlifontiA. PhotO!: Before: National l:...U-k Service files; Afrcr: CourtCS)', James B. Spaulding.
R«oustrwtio11 Gtorr,t Wmhinpn Memori,J Hou.st 11t var,ltinxton Rirthplnu Nnti.on11/ Monw,,mt, Wotmortl.and Co11111) ViixiniA. Photo: Richard Frear.
Tm
lt should be noted that those photographs wed ro illwmtc the guidelines text chat :arc not individu:ally.cn:dircd U\ the cap(ions art from NatioMI Park Scrvitt files.
Acknowledgements
Tiu Stan,i,,rd, for th, T""'111n11 of Histari, Prop,rtut, publi,kcd in 19')2, wen: rcv;c,,cd by a bmad cross-=ion of government entities and priv.ttt sector organiutions. 77u Guidt/ina for Pratruinx, Rmnbilittttin1,, Jhstorini nnd R«onstrutsing HiJro� BNildinf.J were dcvdopcd in cooperation with the National Conference ofSmc Historic PrCservarion Officers and reviewed by individual State Histor.C: Preservation Offices nationwide. We wish to rhank Stan Gr.a.vcs and Caire Adams, in particulu, for thcir dtouchtful evaluation of the nt"W matttial. D:ahlia Hernandez provided administrative support throughout the project.
Finally, rhlS book is dccliC1.tcd to H. Wa.rdJ:andJ, whasc long-term commitment to historic prcsttvation helped define rhc profession as we know it today.
252
The Secretary of the Interior's Standards for the Treatment of Hl$toric Prapertics may be applw:d to one historic rc:sourL"C type or :i. v:uiety of hl$\oric te$Ourcc types: for example, a project may include a complex of buildings such as a h,msc, g:,ragc, :tnd b11m; the sire. wid, a designed. landsc:ipc, natural f'carun:s, and :archcological comp('Jncnts; structures such ;u a systtm of roadway, and paths ot a brid� and objccu such as founrairu and sraruary.
Historic Resource Types & Exa.mpks
Building: houses, b-.ims. sr-,1blcs, sheds, ca,ragcs, courthcmscs. city h.llls. social halls, commercial buildings, libraries, fu.crorics, mills, train depots, hotds. th�rcrs. st-.l• tionary mobile home$, schools, srorcs, .1nd churches.
Si1c: hibimion sit'C.,, foncrnry sites. rock shelters, 'Yilla&C si1cs, hunting :ind fahingsi1cs, ceremonial sites, pctroglyphs, rock c:irvinp, ruins. g:lrdcns. grounds. battlctidds. c-.1mp.�itc.�, sites of 1reny signings, trails, ar� of l;and, shipwrcdu. ccmcteric.�. designed landsc.ipt$, and nat1.1r.ll fc:i.mrcs, sud, ,u sprinet and rock formarions, and land al't".15 having culnmil significmcc.
Flm111t4',f.l.r.r111.,:,.-,,.A.'t11t1K/,y. l'b.r.: Owl,,,A.Hirnbtr11m.
Structure: bridccs, runnels, gold dredges, fic-ctowcrs, c:mnls, turbines, dams, power plants, corn-cribs, silos, roadw.tys, shot towcn, windmills, grain elevators, kilns, mounds, cairns, palis:ldc fortifia.tions, earthworks, railroad gr.ides, S)'$t"Cms of roadways and patN. boats and ships, r.,,ilroad locomotiYCS and cars, tclc.scopcs, carowcls, bindmmds. gucbos. and aircraft
Object: sculpture, monument!, boundary markers, statuary, and fountaiN.
District: college cifflpusa, caunl busincis disttica, residential arc-;s, a,mmcrcial-arc-as, large forts, industrial com· plc:xcs. civic caners, rural villages. anal systems. collections ofhabitution and limited ::i.aivity sim. irrigation systcm.1, large Farms, ranches, cst:a.tcs, or pl::i.nmions, trans-
� l':i • '·portation nci:work.s, and largc"landsc-apcd parks.
� ��- .-{$'dri:tr<U11111fd',..m �tio,,;I �,,.·Prr,/'"'1",v{ Rnowm • 1jpn. p. 15, NntiMnl Rttiltrr B,Jktin /�, H,w to C.mpktr Im
�aii.M'J;<,il� Nn1ion1tlRt'f,UlrrForm,p11blislKtibJtht�ti01111/�1n-Rmnd,,
7.-r Hi,t,nr /Ji,rrirr. 0/No. Arrinl 11irw. N�: N,lhon/l//0,,rlt $mlirt. /,rttmtnt(J Rno11rrn Division. N,t1io1t1tl P,,1* Sn-vi«, U.S. lxP'frtmrt11o{tlot/111rrior. l!J9J.}
Introduction
Choosing an Appropriate Tmatment for the Hi<toric Builcling
The Standards art neither ttdtnical not prescriptive, but arc intended to promote responsible pt0ervation pra.criccs thar hdp pr(l{ffl. our Nation's irrcplaccabk culrural resources. For example, they cannot, in :lnd ofthcmsdYCS, be used ro make cncnri2.I decisions abour which fuarum or the historic building should be s:avcd and which can be changcd. But once a trntmcnt is sdccrcd, the Standards provide philo· sophical consistency ro the work
O,.oosing the rnost appropriate trc2tmcnt fur a building requires careful dcci.,:ion-making about a building's historical significance. as well as taking into account a number of ocher considct:a.tions:
Relative importance in history. Is dtc building a nationally significant resource-a ran: survivor or the work of a master architc-ct or craftsman? Did an important c:vcnt take place in it? National Historic Undmarks, designated for their ·exceptional significance in Amcria.n hisrory," or many buildings individually listed in lhc Narional Regisrct often warrant PrcsttYation ot Raror1.rion. Buildings tltat contribute to the significanc.c of a hLtroric district but arc not individually listed in the National Register more frequently undergo Rehabilitation for a comparibk n�wc.
PhysicaJ eot1dition. What is the existing cnndirionor degree of material integrity-of the building prior to wiork� Hu the original fotrn survived largely ina.a or has it been alttred over time? M the alterations an important part of the building's hlSfOry?
0
l�tion may be appropriate if distinctive matcri�. fcarun:s, and spa.ca arc csstntially intact and oonvcy the building's historical signific:ina:. If me buUdin& rcqntrCS mon: ataulVC: repair and rcplaccmcnt. or if alterations ot additions arc ncctss:ary for a new use, then Rehabilitation is probably d\C mon appropriate rrearmcm. These kl!)' qualions pby major roles in dCfCrmining whar ttt:ltment is selected.
Proposed we. An cucntial, practial question ro ask is: W'"JI the building be used U it WU historically ot: will ir be ;:ivcn a new use� M.any hi.sroric buildin(1 can be adapted for new wcs without scriowly dam.aging their hisroric dwxtcr: special-use proptrtics such as grain silos, foru, tee houses, or windmilb may be c:xm:mdy difnwlt to adapt to new uses without major intervention and a resulting loss ofhi.sroric characa:r and cvcn inttgrity.
Manda«d cod, requi,.mcnu. Rq;aidlcss of the treatment, code requirements will need ro be taken inco consideration. Bur if hastily or poorly designed, a series or codc-n:quircd aaions may jcopardi-z.c .l building's matcruls as well as iti historic character. Thus, if• building needs 11> be scismically upgndcd. modifications ro the historic appearance should be minimal. Abarcmcnt of bd paint and a.sbcsto.t within hL1roric buildings rcquirc1 particul::u care if impor· tant historic finishes arc no< ro be advmdy affected. Fin.ally, altcrarions and new construction nccdcd to meet accosibility requirements under the Amcricaru wid1 Disabiliria kt of 1 �JO should be doigncd ro minimize material loss and vLNal change ro a hinoric buUding.
253
Using the Standards and Guidelines for a Pttscrvation, Rehabilitation, Restoration, or Reconsnuction Project
TIM S«r,t,,ry oft/1< /utrrior) S,aud,,rd,fa, th, 7,,_n,,a,t of Historic Pr.pmia uritb Gt1idJi11a for /'rr#r11i111, &b,abi/i1ali11i, Ratori11x ""'' R«o1utrucli11t Historir Buildh1'1Jarc intended ro ptovidc gui<b.noc to historic buildinc; ownca and building managers, preservation consultanu, ardti .. n:ccs, contractors, and ptojet:t reviewers prior ro m:atmcnr.
As noa:d, whik the tn:atmc:nt Standards an: designed robe 11pplicd 10 all hisrorit resource C)'f>C' indudcd in die National Rqisrcr of Histo,ic Placct-buildin&,', sites. smictun::s, districts. and objccu-c:hc Guidelines •pplr lO tptrij/t n:souro:: types; in du, we. buildings.
lltc Guiddincs h;,,vc been pn:p;an:d ro :wist in applying rhc Standards to all project work; conscqucndy, d1cy an: not meant ro give casc-spccifk advice or address exceptions or �re instances. Therefore, it is recommended that dtc advice of qualified historic pn::scrvarion ptofcssionab be obfllincd early in the pbnning ""ll" of the plOjtct. Such proks>ionab m•r indudc archirccu. an:hin:crun.l hiirorians. historians, historical m&intt:rs. ardtcologisrs, and others who have experience in working with hlSroric building1.
The Guidelines pctmin ro bodt cxn:ri01 and inn:rior work on hUitoric buildinp of :JI siia, m;ircrials, and types. Those approaches 10 work rrc:itmcnts ;and n:chniqucs that ;ire consUl1cnt with 7k Sttrr11117 of dJit /J,m-ior's StAutW'th for d,t Trt!dhUmt of HUtllrK Propn-tia arc listed. in d,e "'R«ommendcd.• column on the left; those which a(C inconsisn:nt with the Sa.ndards a(C IUlrcd in the "Not Rcc:ommcnded" col· umn on the tight.
One ch.peer of <hi, book;, devoted to ach of the fout m:atmcna� Prcscrva1ion, R.chabiliQrion, Restoration, and lttconstrucrion. Each chapter con· rains one set of Standards and accompanying Guidelines diat arc to be used throughour the: couuc of a pc:o;ca. The Standards for the 611( trca1mcnt. /+otr11tttion. require (CfCnrion of the grcarcst amount of historic ti.bric, along with the building's historic form, features, and derailing as rhcy have cvolvtd over rime. The 11,/,,,b;J;,,,rio• Snndanh ac:luiowlcdg,: the need to alter or add to a historic building to meet continuing or new uses while retaining the building's historic characn:t. 11,e Rotomtian Srandards allow for thc dcpktion of a building at a panic:ulat time in KS hUltory by pn:scrving materials from the period of sig· nifiancc and (Cffloving materials from other periods. The RNo1utn,ai011 Standards establish a limited fruncwork for rc<IC.lC'inc; a vanished or non-surviv• ing building with new man:rials, primarUy foe inn:t· pn:tivc purposes.
The Guidelines an: pn:adc:d by a bt.f hi>rorie>I cm:rvicw of the primary historic building materials (nwonry, wood. and atdlitcctund mcial,) and their divcrsc uses CM:r time. Nat, build.inc katurcs com· prised of rhcsc man:ria.b arc discussed, beginning with the oucrio, then moving to the inrcrior. Special requirements or work th:n must be done to meet aa:cssibility requirements, health and safety code rcqulfffl\cna:, or n:trolirring to imprO¥C energy cffi. cicncy on, also addrascd hctt. Almough u,u,lly ''" part of rhe OYCtall process of ptoteaing hU:toric build· ings, this work mwr also be assessed. for irs pon:nriaJ impact on a hU:toric buUding.
Hisrorical a-view Building &wior MttmiJ,
Masonry
SIOl,e is one of the motC bsting cl nwon,y buading m-rcri:rls and 1w been u,cd throughout <he hi,rory of American building consaucrion. The kinds of none most commonly cncounn:n:d on hiltoric buildini;s in the U.S. indudc variou, rypcs of sandstone, lim<-1tonc, marble, granite. da(C and 6ddrtonc. Bridt varied coruidm.bly in size and qua1ity. Before 1870, brick clap wen: pn:s,cd inlO molcb ..d wen: often unevenly fired. The quality of brid< dcpa,dc:d on the <ypc of day a..ilablc and the brick-making «chniqucs; by the 1870,-..,,lrh the pcrfcaion of an arrusion pcoc:as,--brick.1 bc:amc mare unlfonn and durable. 7/mw _,, • ,l,o a kiln-dried day product popular from the l•n: 19th ccnrury unril the 19,0S. The development of 1hc ncd-fur.mc office buildinp in the ady 20th ccnauy contributed lO the widc,pn:ad UIC of a,chin:auraJ o:na a,a,, Ad,«, which con.sins of sun-dried earthen bricb, was one of the earliest building materials used in the U.S., primarily in the Southwest when: it• nill populat.
Morr,,r is wed to bond rogcthcr muonry unia:. Historic mortar was generally quite 10ft, consisting prinwily of lime •nd And with orhct addi<M:S. By the b<tet put of the 19th a:nrury, ponland a:mcnt was UNally added n:sulring in a fflOfC rigid and non· absorbing mortar. Like hi.storic mortar. early Sllltt'II cm.rings were also heavily lime-based. incrasing in lwdncss with the addition of ponland cement in the btc 19th century. Conmtr has a long history. being variously made of tabby. volcanic ash and, later, of natural hydr.aulic cements. before the inrrod.ucrion of potrland cxmcn< in the 1870s. Since then. conactt h:u afso been wed in ias prcc:ast form.
While masonry ir amon; me most dur.ablc ofh..ulric building materials, it is also very ,usa:prLblc to damage by improper maintenance or repair n:cbniqucs and harsh or abrasive dcanint methods.
254
Wood
Wood h.is pl11ycd ll ccn,tal role in An1cria.n buildins durini; every period and in cvc,y style. Whether as struttUral members. cxrcriot d:i.dding. roofing, intcri• or Fini.shes. or decorative fcarurcs, wood is frcqucndy an csscnm.1 component of hutoric buildings.
lkausc it can be easily shaped by uwinG, sanding. planing, auving, and couging. wood is used for archit1:ctunl b.Nrcs such :as cbpbo-lrd. c01:nica, bmckcrs, cnrabl:inuts, shutters, columns and balwnudcs. These wooden fcarurcs, both funcrion;i,I and dccomivc. a� ofu:n impom.nt in defining the historic char;icrcr of the building.
Ardurcaun.1 11\CW farurcs-such as an iron r...dcs, porches. and ,iq,s; wa metal cornices, ,id-
:� �'°:o':,��= ��=:���d hardwa- ofu:n highly dr:a,ratm: and may be important in defining the overall du.racttr of historic American buildinp.
Mccb commonly used in historic buildin&,S include lead, tin. zinc, copper, bronze, brus, iron, steel, and n, a lesser extent, nickd alloys, n:a.inlcss sttd and alu· minum. Historic mcul building components were ohcn cn:arcd by highly d<illcd, loal artilans, and by the late 19rh century. m:iny of chcsc componcna wen: prtfabriatcd and =lily available fn,m anioi;s in mndardiicd siza and designs.
255
Building Interior
Sttucnual Sp,<ms
The cypcs of mucrural sysccms fuund in the Unircd States mdudc, but ill'C noc limircd to me followiR£: wooden frame consm1clion (17th c.), b:1.lloon frame construction (19d, c.), load-bearing masonry constNCtion (18rh c.), brick avicy wall construction ( I 9ch c.), hc:ivy timber po,r •nd beam industri,I constNcrion (19th c.), fireproof iron construction (19th c.), heavy masonry and .steel construction (19th c.), Jkdcul steel construction (J 9th c.), and concrete slab and pcut conmuction (20th c.).
lf brurcs of the struaur,aj system arc exposed such 3S loadbcaring brick walls, cast iron columns, roof trusses, posts and beams, vigas, or stone foundation walls. they may be imporomt in defining chc building's cm:rall historic cbini.c;rcr. Unexposed .structural incures that arc not d1ar:iacr-dcfit1ing or o.n entire strucrur:il symm may noncthdcss be signific.int in the history of building tcchnolOI:)'. The sttutNral sysrcm should alw.tys be examined and c:valuarcd early in the project planning sragc to determine it1 physial condirion, its ability to supporr any pto� ch.ln&ci in usc, 1nd its importance to the: building'$ historic clur.ictcr or hiJrorial significance.
Sp-.Fanua,aadfiaisha
An inri:rior Roor plan, rhc am.ngcmcnr and sequence of spaces, and builr-in fcuurcs and apP,ft finishes arc individually and coUcctivcly importtnr in defining the hinaric c:harai;t'Cf of the building. Interiors an: romprisui of a series of primuy and scc:ondary spaces. This is applic;blc to all buildinp, from counhowa to cuhcdrals, to coc:taga; and off'u:c buildingt. Primary spaces. including cnuanc:c halls, parlors, or living rooms. assembly rooms 1nd lobbies, arc defined not only by their funaion, bur aho by their fcarura, finima, a:iu: and proportion.
Sccnndary spaas ... oft.n mon: functional man dca,t"luvc, and may include kitchau. b,tluooms, mail room,, utility spaca:, 1CCOndary haBwqs, lin:srail'I and office cubida in a commercial or office space. Exrcna:ivc: �SCS can often be made in thc,c less imponanr ucu without having a detrimental cffi:a on the ovcnll hinoric clur=.
258
M«hanial Systems
Mcdu.nical, lighrin; :ind plumbing sy.ucrns improved significantly with the coming of the lndwuiaJ Revolution. Th<: 19th ccnNry inmat in hnicnc. personal comfort, and rhc rcduaion of the spread of dUC:UC wen: met with the dc:vclopmcnt of ccntr.iJ hClting. piped w.itcr, piped"'' ,nd nawoik of undcr;round cast iron sewers. Vitl'C'OW riles in kitchens, barlu and hospi"'1s could be dClnod cuily and regularly. The mw produaion of cast iron n.diarors made central hearing affordable to m2ny; some radiaton wctc elaborate and indudcd if>Ccial wanning chambcn for pbta: or linens. Ornamental grilles and rq;isccrs provided dccor.uivc coven fur funcrional hearers in public Sp;lW. Hy the rum of the 20th ccnrury, it was common to have aJI these modem amenities u an Uuq;ral put oi the building.
Tl,c greatest imp:lCU of the 20th cc-nwry on mc:chanical J)"tcnu were the use of ck.:rritity for intctior lighting, fon:cd air vcnrilation, dew.tors for tall buildin(;S,, exterior lighrinG, and clca:ric heat. 1nc new r of tcehnology brought an increuingly high level o design and dccor.uivc an co many or the funcrio� dcmc:na of mechanical, clcaritm \U\d plumbing; systems.
1'nc visible dccora1ivc Fcarura or historic mechanical systc:nu: sud, as grilles, lighting fu:Nn:s, and orna· mental fWitchpl:m:s m.ty a,ntributc to me over.au historic character or the building;. Thrir identification needs to take place, together wich an cvalu11rion of their physic!. condition, cady in projccr pbnning. On rhe other hand, mechanical systems nccd to work cfficicndy so many older systems. such as compressors and their ductwork. and wiring; and pipes often need co be: upgraded or cnrirely rcpbccd in order to meet modttn rcquirancn.11.
Building Site
Thi:: building site consists or a historic buUding or building,, SU\ICtUr<S, and llSSOCiarcd landsapc fca. rutca within a designed or legally defined p,tcd of land. A site may be: .1ignificant in iu own right, or bcc:a.usc of its as:sociarion with me historic bu.I ding or buildings:. The rclatioru:hip bctwcc:n buildings and landscape fa.NCCS on II sitt: should be an integral part of pbnning for cvcry work project.
The setting; is rhc larger area or environment in which. a hSStOric property d loated. It may be an urban, suburban, or rural ncig;hbothood or a naNral landsapc in whkh buildings ha.c been conmucted. The relationship of buildings to =ch othct, actbacks, fence patterns. views. driveways and Mlkways, and street m:c:s rogcthcr Cl'Cltc the character of a district or ncighbomood.
259
Special &quimncn,.
�,it rl"tt 111,ut bt do1,e 10 mm t1ct0Jibili1] m,11irt-1,m1tJ. l1tt1/th n11d lll[CIJ rrqt1irr111mts or rrmfittint to improut t11nr:, t/ficit119 iJ 1111111/ly 1101 /"'rt ofrlx owr"" pronu of pror«ti11i hUtorit /111ildi11p; mtl,n; this work iJ nssa#d for in �ttmi11/ impttct 011 tl1t biJ10rit b11ildi11t-
F.ncrgy Efficiency
Some fuuurcs of 11 historic building or site a:uch as cupolas, shutfCC'S, transoms, .skylights, sun rooms, porches, and pb.ntinp c::an play 11n cncrgy-eonscrving role. Thcn:fotc, prior ro rcuofiuing historic buildings to make them more cncrgydncicnt, the Arn step should ah't':l)'J be to identify and evaluate existing historic features: to nsscs.s their inherent cncrgy-conscrving porcnrial. Ifie is dcrcrmincd that retrofitting m<11Sun:s ai,: :,ppropriarc, then roch work need, a, be carried out with patrirul:u care m ensure that the building's hiJtoric clmracta is rct;1.incd.
Accesss1,ility Con.siduations
It is often ncc;cw.ry to make modifiations to a hisccmc building so that it will be m compliance with current ac:ccs:sibility code requirements. Accessibility to ccm1in hiJtoric srruccurcs is n:quircd by three specific fr:dcr.al laws: the ArchitcCtUral Birrim kt of 1968, Section 504 of tho llchabUittrion Act of 1973. and the Amcriaru with Dinbilirics Act of I 9'JO. 1:;;:der.J rules, n:guhuions, and standards have been dcvdopcd which pro"MX gu�nc:c on how to accom• plish access to historic iltc.l$ for people with dis:ibilitics. Work mwt be catcfully planned 11.nd undemiken so that it docs not n:sulr in me loss of du.raacrdcfining spaces, fi:a.rurcs. and finishes. TI1e goal is to pRWide die higl1cst IC\lt'I of acccs.s with the lowest le.cl ofimpac:r.
Health and Safety C.Onsidcrations
In undcn:akinc work on historic buildings. it is nca::sA,Y to consider the impact that meeting current health and .,[cry codo:s (public health, oa:uparional hcald,, lili: ..r..,.. lire ufcty, olcarical, seismic. mucwral, and building codes) wiJl h,,. on ch:in>r:rcrddining spaa,, f.aturu, and finishes. Spccw coordination with me n:sponsiblc cock alf'xi,b" the stare, county, or municipal IC"ICI may be rcquiml Securing n:quir«I building pc:nni11 and ocn&pancy licx:N<S b best acmmpluhc:d early in wo,k project pl,nning. It � om:n necessary a, look beyond rhc ·tctter· of code rcquircmcnu to their underlying purpose: mosc modern codes allow for altcrari� afProacha: and n:asonabk variance to aduac compliance.
Some hbtvric buHding mar.rials (insubrion, lead paint. etc.) contain toxic substanca rhar arc po1enrially hazanlous ro building occupants. Following cucful in'1CStig:ation and analysis, some fotm of abatcmcnt maybe required. All woikcrs inYOh-cd in rhc encapsulation, repair, or removal of known toxic nwcrials should be adoquatdy rr:oincd and ,hould wcu proper pcnonal prol<Um: gar. Finally. p=· rive and 101arinc maintenance for hlSCOrie structura known to contain such materials should .l1so be �loped co indude proper warnings and pn:aurions.
260
Standards for Preservation
& Guidelines for Preserving Historic Buildings
Pmnwttiou is rlifi11rd ,u 1/x drl fir prr,cns ef 11p/H)i1'1, mm· mm Jl«dlt1'7 I• 11u111i11 1/w rxistilltfonn, i11lt,:ri1J. 111,d 11,,ani,ch •/ "'' l,Uwk l"'f>MJ- \lw*, indMtliu,./rrlimi· """ llltdl/1"1,. JIIOl«r """ 1/illnliu 1/,e l"'f>W1J. t"'fflllJy fimun 11po,1 11Ko11f;Oinx n111i11tn11111« nnd rtJ#lir ofhu/orir ,,,,.,mn/J 11,,tlfi,,11,m "'"'" Wtln r.-ttnuiw 1rpbt«mr111 ,rn,I ,ww c.UJlmClion, lwu, rxt«WrNltlitiont fin' n,J UN,J,in 1/w np,rofdlistrtrfllutHl:I� ,.,;,,,;,m,u,dmui,iw 11/pu/i"Kof11t«httm'r11, drrtrimL ,1111lpfumbi11tSJllmt1 n111I 111/'" cwlr-rrr,11irnl worl:,. 11111/:r prr,pntin fimt1it»,,J is ,,,propri111r wid,i,, "pmitr11tt1io11 p,vj«t.
Sandan:ls fur l'n:,c:rvalion
I. A property will be U$Cd as it was hUrorically, or be given a new we du.t maximizes the n:tcnrion of dUtincrivc marcriah. features, spaces, and spatial rdationships. Where a rrcarmcnt and we have not been idcnrifi<:d, a propcny will be pron=d and. if ncceswy, mbilm:d un,il addirional work may be undcrcakcn.
2. The: hi.storic character of a propcny will be rct.1incd and pn:scrvcd. The rcplaccmcm of inc:aa or repairable hisroric materials or alteration of brurcs. spac:a, and tparial relationships that char.acn:riu: a propc"J' will be aw,idcd.
3. Each P'°P'"Y wll be nxognm:d " a physical n:mrd of in rime, place, and we. Work nccdcd <o ,cabilizc, consoJidan:, and conserve existing hiJroric mareriab and features will be physic:ally and visually compa,iblc, idcnriliablc upon do,c inspection, and properly documcn«:d for nmm: n:,carch,
4. Cllango ta a propc:ny that have acquired historic signi6cancc In chcir own right will be retained. and prcscr.cd.
5. Discinctivc man:rials, ftaturts. finishes. and construction rcdmiqucs or oampk:s of craftsman.ship tha.t char.ac<crize a pcopcny will be praocvcd.
6. The existing condition ofh&Sroric fcatun:s will be cwluarccl to dcttrminc the appropriate: li:vd of inrcrvcnrioo nccdcd. Where dlC sa'trity of dm:rior.i.rion requires n:paM" or limited �bccmcnt of a distinaiwc bturc, rhc new material will match the old in composition, design, color, and n:xture.
7. Chemical or physical rrcmncncs. if appropriate, will be undertaken wing the scndcst mc:uu possible. Trcatmaits that cause damage co hiscoric materials will not be used.
8. Archcological resources will be protcetcd and pracrvcd in place. If rudt resources mwr be disturbed, mitigarion mcasurcs will be undc:rttkcn.
261
r\ \.__.'
Guidelines for Preserving Historic Buildings
Introduction
In Preservation, the opt:lOru for rcpb.ccmcm atc less c,:rcnsivc than in the ua.rment, Rehabilitation. This i.s hcausc it is a.qumed at the ouuer: that building m:.ttcrials .ind tharxrcr-dcfming ftiltun:s arc CJ!cntially int.act, i.e. thar more hinoric f.abric has survived, unch:tngcd. over rime. Thc cxpC'CUcd goal of the Standuds for Preservation and Guidelines for Prt1crving Historic Buildings is rcrcnrion of the building's cxi.n:ing form, fcarurcs And derailing. This m:iy be as simple as bane m.:1.inrcn:1.ncc of existing marcr�ls and fc-.arurcs or may involve prcp;ring ;a hi.storic strucnm: rq,on, undcrt-1.king labor.,,rory tating such as piint and mortar :1n:1lysi.s, and hiring conscrv.1tors to perform sensitive work such a.� rcconsrituting inrcrior finishes. Protection, maintenance, and rep:iir arc cmphasi-lcd while rcpl:tccmcnt i.� minimi1.cd.
Identify, Retain, and Prescn,: Historic Matcrrals and Futures
The guidance for the tn::umcnt Preservation �gins wirh n:commcndltions to identify rhc form and dct2iling oftl1osc archircctUral m;a.tcl'\nls and ftarurcs that 3ft import.Int in defining the building$ historic char:icrcr and which musr be ref.lined in order ro pre� .serve that du1ra.crcr. TI,cn:forc, guidance on id�utifyiug, 1Yt11U,;ng, and pran-11U11 ch:1r.1crcr-dcfming k:1� rurcs is 3.lways given f1m. 111c character of a historic building m:i.y be defined by the furm and detailing or cxrcrior m:i.tcrials, such .lS masonry, wood, :i.nd metal; exterior fc.i.run::s, ruch :u roo'1, porches, and windows; interior m:itcrials, ruch at plam:-r and paint; and inrc� rior bturcs, .NCh as moldings and srairw.i.ys, room configuration .1nd sp.uial rdationsl,ips, as well as srructura.1 and mechanical $)'Stems; and rhc building's sire and setting.
Stahwu Dcttriontcd Hinoric Matuials and Features as a l'rdiminary Measure
Dcrcriorarcd porrions of a historic building may need to be prorcctcd thorough preliminary stabilization measures unril additional work can be undertaken. StttbuiziJ11 may include structural rcinfora:mcnt, wcathcrization, or corrccring unsaJc condil'\ons. Temporary stabiliu.tion should always be carried out in such a manner rhat it detracts :u little as poi:i;iblc from the historic building's appearance. Although it may not be ncccssary in a,:ey p�rvation project, stabilization is noncthdcss an integral parr of the trcarmcnt PreJervation; it is equally applicable, if cir� cumstmccs w�rrant, for the other treatments.
Protect a.nd Maintain Historic Materials and Fearu ...
After idcnrifying those materials and features that a.re important and must be retained in the process of Preservation work. then prok:rtint n»d """1wiui11t them arc addressed, Protection gtncr.Uly involves the lcasr dcgcc ofinrcrvcntion and is prcpararory to other work. For o:amplc, prorcction includes the mainrcruno: or hiscoric marcrials throU£h n-catmcna suc:::h as rust rcll'l(W,ll. caulking, limircd paint rem.oval, and re-application of protective roarings: the c:ydical clW1ing of roof gurttr systems; ot insrallation of kncing. alarm systems :1.nd other temporary protcttivc masun:s. Ahhough a hUroric building will wually require more cxrensiv-c work. an oYc:::n!I evaluation or its physical condition should alw:ays begin at thU level.
Repair (Stabwu, Consolidate, and Co...,,.) Historic Material, a.nd fa.tura
No.t, when the physia.l condition or charactcrdc:::fining materials and features requires additional work, 1Ypniri11g by 1111bi/iz;ing. co1uoluittti11& aJttl
n
rirr1t /76()
rirc1t /8()()
co,,.,.,,;,,l is recommended. Preservation strives to rcr:ain cxining materials and forurcs while employing as little new material as possible. C.Onscqucntly, guidance ror rq,airing a historic material, ruch as masonry, again bcginJ with the least degree of intcrvmrion possible such as strengthening fracilc materials d,rough consolidation, when appropriarc. and·rcpoinringwith mort2.r of a.n appropriate strength. Repairing masonry :u wcll as wood and architcCNra.l metal fc:i.rures may also indudc patching. splicing. or od�rwisc rcinforc� ing them using recognized prcscMrion methods-. Simila.rly, within the narmcnr Preservation, portions of a historic structural system could be rcinfon:.cd using conrcmporary marcrials ruch as stttl rods. All wo,k should lx physially and visually compatible, identifiable upon dose inspa:rion and documcnttd fur furun: rcsc:arch.
If repair by nabilrz:1.rion, consolidation, a.nd conscrvarion proves inadequate, the ncxr level ofinttrvcnrion involves the /i,,ukt/ repilunMU O, lti,u/ of o.ttruivtly deteriorated or mi.uingJ>4rtsofkaNrCSwhcn there arc surviving: prototypes (for example, bradtcu. denrils, steps, plasa:r, or portions of slate or rile roofing). The replacement marcrial needs to match the old both physically a.nd visually, i.e .. wood wirh wood, ct"C. l'hus, with me e:xo:ption of hidden structural rcinforo:mcnt and new mcchanic:al system components, substirutc materials an: n01: appropriate in the treat· mcnt Preservation. Again, it is important that aU new marcrial be idcntiftro and properly documented for future racarch.
lf prominent fcarurcs arc missing, such as :m inrcrior staircuc:, o.ttrior cornice, or a roof dormer, dtcn a Rehabilitation or Restoration trc:umcnt may be more appropriarc.
262
Energy Elllcicncy/Aa:cmbilitr Comidorations/Hcalth and Safety Code C.Onsidcrations
111� 5L'(lion., nfthc l'n:scrwtion guid.uu:c addrcs., work Jnnc 10 mrc1 3..:r;1..,,ibili1y n:quin:ntcnts .and h .. �.ddt .inJ wl�'t)· L-ndc ttquirem..:i1ts: nr Umiml n."tm· lining n'llo."'.l\Ufl.'� tn itnr� enc'D' d)ici.-n"')'• Ahhnugh 1hU work is quite nltcn .in irnran3nt up .. '\.1 nfrrcccrv,UiM prujL'Ct), it is lbu.111)' nnt part n( the tl\'('rall pto«'SI nf {'tot .. ..:ting, �ililing, L'tln.\Crvini;, ot n:p;tiring cll.lniL, .. -r.Jdining fc111urc,,: r.uhcr • .\Ud1 work i, �-cl Tnr it� potcm QI nc:gath"C intp;act on tht.: building's d1a�tL't l!nr thU 1c.btln. }'lrtkul-.v urc n1ust he uskL"n not 1n nbS.."\UC, J:sn\oll,,>c, nr J1.."\t"')' ch,.rJctcr-dcfinin� m:uerfab or k.uuro in the r� nf unJi..'rt'!W.ing W('lrk 10 mci.1 ..:odl: and �r�r rcquiran .. -nu.
Pmti-wui.011 IU a Treatmnlt. Whm tht proptrty's dislinr1i11t mattrials, ftaurm. and spam art mcnti11lly in:,ttt IUlt! tlnu conlltJ tht hisu,,ic 11f!lifimnu 11•itho111 txtt111i11t rrpc,ir or rrpl,1m11t11t; whtn dtpictio11 ,tt ,t partirWAr ptriod oftimt is Hot appropriau: a,u/ wh,11 11 continuint or 11tw UJt d<>t:s not rrquirr add,"tions or atmsitit alllrntUms, PmmMt1011 ""'Y bt ro,uidrred ns a h·tatmmt. Prior to undtrtdk1"nx work, a doc11mt11· tAtiou pfo, for !'>tlt,,..,;o• should b< dn.,/,,ptd.
Preservation
Building Exterior
Mt.t0nry: Brick. none, terra a,tta. concrete, adobe, stueco, and mortar
R«Mttmtndttl
J,k,,rif,i,11, rrtdiH.it1.c, m,d /rtSff'ltiHt masonry In rum th.u are impomnt in dcfinini; the ovcr:sll historic d1aractct of the building rudi as walls, brackets, railings, cornices, window ardtitravcs, door pediments, stq,s, and columns. and derails such as rooting and bondini; patterns, coatings, :snd color ..
S1.t1biluiJ11dctcrior:itcd or damaged masonry as a preliminary measure. when nco:uary. prior to undertaking appropri.arc pmcrvation work.
Prot«ti111 mu/ mlU1111UJU11r masonry by pr0Yiding: proper drainage so rhat wati:r docs no, nand on A:sr, horitonta.l rur&ccs or accumulate in curved decorative bruro:.
Ocaning m:ssonry only when ncccuuy ro halt deterioration or remove heavy soiling.
Canying out masonry sum.cc deaning rests after it has been determined thar such deaning is :.ippropriatc. TC$a should be observed avtt a sufficiicnr period of time so chat both the dnmcdi:sn: and the long ranee effects are known to enable selection of the gcndcst method possible.
Not lwonmiend«I
Ah:cring muonry &arurcs which :src important in dclinini; the overall hisroric ch;wcttt of the building so that,� a result, rhc chmacr is diminished ..
Rc:placing hisroric muonry katun:s insn:¥1 or repairing or replacing only the deteriorated m:isonry.
Applying painr or other coari.np such as stucco to masonry chat has been hisrorically unp:sintcd or uncoated.
Rcmovini; painr from hisrorically painccd masonry.
01an�ng the t)1X of painr or coating or its color.
r.1aing ro stal:iiltJJ: dctcriorarcd or damaged m:ssonry until :additional work is undcmlc.cn, chus allowing further damage to occur ro the hisroric huilding ..
Failing ro cvaluatl! :snd near the various c:suscs of momr joint dcttrioration such as leaking roofs or gutter,, dilfcrcnriaJ set• dcment of rhc building. capillary acrion, or otrtmc WC11her exposure.
Ocaning masonry surfaces when 1hcy arc noc heavily solk:d, thus needlessly introducing d1emials or moi.sture inro historic man::rial1 ..
Ocaning masonry smfaccs without testing or without sufficient rime for dte testing results ro be of value ..
263
Rtrommmd«I
Clcoming m.i.sonry surf.aces with the gentlest mcrhod pcwiblc, such as lmv prcs.1un:: W'3.tcr and detergents. using n.uural brisdc brushc.\,
hupccting painted masonry surfu.ccs to dctctminc whether repainting is nca:ssary.
Removing dam;i,gcd or dcrcrior.ucd painr only ro rhc ncxr sound bycr using rhc gcndcsr mcrhod possible (e.g., handscr.,.pinc) prior to repainting.
Applying comp;,.riblc painr coaring S)'S\etnS following proper surfucc prcpar2tion.
Repainting with colors dtat an:: historically appropriarc to the building and disrricr.
Evaluating rhc existing condition of the muonry to dctc:f'minc whether more dun protection and mainrcn:tncc arc rcquin:d. rhac is, ifrep,.irs\o nwonry bturawill be ncccss-ry.
Rtpairiug, Jt11bilfU1,g, 1111d c-o1Jffr,,i11t fragile nwonry by wing well-tested consolidanu, when appropriate. Repairs should be physically and vis!Jllly comp:nihlc and idcnri�able upon close in.\pcction fur future rcse.1n:h.
Preservation
Nor R«omn,mdtd
Sandbl.uting brick or stone surf2.a:s wing dry or wet grit or orhu abrasiva. These methods of deaning pcnnancnriy erode the surfucc of the marcrial and acttlcrate deterioration.
\.hini; a cleaning mcchod that involves wmr or liquid chemical solutions when there is any possibility of frtt1ing tcmpcrarura.
Ocaning with chemical products that will damage masonry, such as wing acid on limcsrone or marble, or leaving chemicals on masonry surfaces.
Applying high pressure water dc-:,,ning methods th:u will damacc historic masonry and the mom.r joints.
Removing painr thar is firmly adhering ro, and thw protecting. ma.sonry surfaces.
Using mcchods of n::moving painr which arc dcsrrucrivc ro masonry, such as sandbl:urin;, application of cawric solutions. or high pressure watttblasting.
Failing to follow manufucrurcrs' product and applic.ation insrruc:tions when repainting muonry.
Using new painr eolott that arc inappropriate to the historic building and district.
failing to undertake adequate measures to wurc d1c pron:crion of masonry brurcs.
Removing masonry that could be m,bilizcd, repaired and conserved; or wing untested consolid.inrs and untrained pcrsonnd, thus cawing furrher damage to fu.gilc materials.
Preservation
&tommtndd
Repairing masonry walls and other masonry brurcs by rcpointing the morur joints where there is evidence of dctcrior.1.rion such as disinrcgrating mortar, cracks in mo{W" joinu, loose bricks, damp wolls, or d.magcd plaswwori<.
Removing dcterior.1.ccd mora.r by arcfully hand-r,,king the joinu to avoid dam.aging the masonry.
Dupliating old momr in mcngth, composition, color, and tor.Nrc.
Duplicating old mortar joinu in width and in joint profile.
AA"flllllr "rw«lil,n 11,,,l ,,.,,intrnlfntt of II hul#rk b,,i/tli,'t is 1111 on,:oi"t tommiJMml. Hnr, two worlim "" "n'mini mu/ rtj>«iHJ.ini nJmfr unr ,1,,,/ tlltllltl t,i,,,. If Rl,jirLt tTM1Jt1mu 1'/'f ntf,Udtrl. mon txtnui.11t-Rptrirt1nd rtp"1amtul will IN ""{1Uml. &rh In fan},nwllimHinn II l11U/Jinii hilurit in/lfril)
Not /1,mn,n,nr,/,d
Removing nondctcrioratcd mortar from sound joints, then rcpointing the entire building to achieve a uniform appearance.
Using clcaric saws and hammers r:i.ther than hand cools ro remove deteriorated inortar from join rs prior ro rcpoinring.
Rcpointing with mortlr of high portland cement conrcnr (unlts.s tt is the content of the historic mortar). l11is an often Cl'Clltc 11 bond that iJ monger than the historic m:i.tcrial and an c.ausc: damacc as a rault of the differing coefficient of expansion and ihe differing porosity of d,c material and the mortar.
Rcpointin; wid1 a synthetic aulkins compound.
Using a ·scrub• mning technique to rcpoint instead of tr2ditiona.l rcpoinring methods.
Olanging the width or joint profile when rcpointing.
264
R«ommtndcd
Rcp:i.iring stucco by removing the d.tmagcd m.i.teri:il and patchinc with new mMXo thar duplicates the old in mcngth. composition, color, and rnrurc.
Using mud plaster as a iurlxc coating over unfired, urur.abilrt.cd ;idobc because the mud pl.un:r will bond to ,he adobe.
Curring damaged concrcrc back ro remove the murcc of detcriomtion (ofrcn corrosion on metal rcinforccmcnt ban). The new p:uch must be applied carcfully !O it will bond sati.sfucrorily with. and n�teh. 1hc historic conacrc.
Rcp.liring masnnry fuituttS by parching, piecing-in. or othcrwLM: reinforcing the masonry using rccognittd prcscmrion methods. 11,c new work should be: unobtrusivd.y dated to guide li.inuc �arch :ind rn:atmcnt.
Applying new or non-hi.sroric surfucc ncumcnrs such as w.m:r-rcpcllcnt coating.s ro masonry only afo:r rcpointing and only if masonry rcpain: have fu.ilcd ro arn:sr water pcnctnmon problems.
Preservation
Not R«onm�nt:kd
Removing sound stucco; or rcp,1,iring with new stucco thu i., SttOf'lgtt than the historic marttial or docs not convey the same vi.sua.l appearance.
Applying cement stucco to unfired, unnabiliz.cd adobe. Bccaust the cement srucco will nor bond properly. moUturc can become cnrrappcd between materials, rcsulring in accelerated dcrcriorarion of the adobe.
Parching concrete without tt:moving the source of dctcriorarion.
Removing masonry dm could be repaired, using improper rcp2ir tcChniqucs. or failing ro document the new 'NOrk.
Applying waterproof, wam rcpd\en1. or non·hUtoric coatings such as srucc:o to masonry as a submrutc for rcpomting and masonry rt:p:airs. Coatings are fu::qucndy unncccmry, expensive. and may change the appc�a: of hinocic masonry as well as accdcrarc its dcrcrioraiion.
Th, follow int work i1 highlighr,d to indicttt, thAt it rrprtuntJ tM ,:,tnttst tkpr, of intrr1.1n1tion t"umll1 mon1n1md,d within th, lttntni,nt Preservation, ttnd 1hou/J onlJ lu con1iJmd 11.ftrr p10ttt1ior,.. 1tnbifu:atian, nnJ rrpnfrffJnttnu J,,,,,,, bttn nddrrud.
Limited Rcpla&:ffllcnl in Kind
Replacing in lcind cim:Mivdy deteriorated or miains �ra of
nwonC")' IC.uuro wh..-n the« an: Nrvivins p<Olncypa such a, l\"TTol•cnu;i br.ai:kcu or stc,nc Nlusu:D. The new wnrk ,houkl match the nlJ in nl.tn.-ri,1,I, Jcsign, i;nlor, o.nJ tarure: 11nd he rn1olt1rusiwly dual ffl cui<k· ltuntc n:sc.wch �d 11't"olffl'ltnt.
Not Htro,m11f111ktl
RcpllKing an cncin: nwnnrr ftatun: such ;1., .& 1.'0lumn or stairWi)' when l\mittd n:pl.M.'-'TllCN of d&-rinrared ,1,nd mis,ing p.uu is appmpl'iiltC.
Using repuct-mL'flt rmtc:ri.11 that Jocc noc m.it1.·h the hisrori� nwnnl)' farun:-; nr failing 1n prop,:rlr Jocum.:nr rite R1.-Wworl..
n _,.
Preservation
Building Extmor
Vll>od, Clapboanl, wathcd,oud, shl..gk,. and olha ......i... acling and d«oratnc _,.
R«omnwukd
Idnulf:r,lf. rtmD,;,,f, ,n,d prrs,r,li11twood fcarurcs thar arc important in defining the overall historic character of the bUilding such as siding. cornices, brackets, window archirravcs, 2nd doorway pediments; 2nd their paincs, finishes. and colon.
&:,bi/iw,,rdctcrioratc:d or d.unagcd wood as a preliminary measure, when necessary, prior ro undcmking appropriate prcscrvarion work.
Prot«ti11g 11Jui m.ti11ttti11U1t wood features by providing proper drainage .so thar water U n.ot allowed to mnd on flat, horizonW wmccs or accumulate in dccontivc ftarurcs.
Applying chemical preservatives ro wood features such as beam ends or outriggers rhar arc exposed ro decay haurds and arc traditionally unpainted.
Retaining coarings such as painr that help protea the wood from moisture and ulmviolcr light. Paint rcmov:d should be considcttd only whtn: there is paint rur� deterioration and as part of an overall maintenance: prognm which involves repainting or applying orhcr appropriarc prottcrivc coarings.
Inspecting painted wood smfacc:s to dcttrminc whcmcr rcpainring U ncccssa.ry or if deaning l$ all dtat is required.
Removing damaged or dctcrioncrd paint to the next sound layer 111irc the, gentlest method possible (hand.scraping ,nd handsanding,), then repainting.
Nat RmJmnwndld
Altering wood fi:aturcs which arc important in dc6ning the overall hisroric character of thC building.so that. u a result, the dtaractcr U diminished.
Replacing historic wood features insttad of repairing or replacing only the deteriorated wood.
Ganging r\1e type of painr or hn\lh and i1s color.
Failing to stabiltZ.C dctcriorarcd or damaged wood until �dirional work is undcmkcn, thus allowing furdu:r dam:1£( to occur ro the hilroric building.
Failing to identify, Muarc, and treat the cawcs of wood dm:riontion, induding f>ulty fwhing. laking gutters. cr.icks and holes in siding, dctcrior.ucd ci,ulking in joints and seams, plant material growing to0 close to wood surfaces, or ins«t or fungw infacation.
Using chemical prcscrva1i\lCS .sud, as creosote which, unlcs.s they -.vrre U$Cd historically, can change the appearance of wood features.
Snipping paint or odicr coatings ro reveal bare wood, rhw c:tpofing hisrorially coated surfaces to the effects of ,1,cctlcr:ucd we1thcring.
Removing �int 1hat is firmly adhtring to, and thw, prottcting wood surfaces.
Using dcsrructivc paint removal methods sudt as propane or but:ane ron:hcs:, sandbb.sting or watcrhlasring. Thcst methods can irreversibly damage historic wnodwork.
265
Using with can: electric hoc.air guns on dccoraciYC wood fcarurcs and dccnie hear pbtc:s on Aar wood surfuccs when painc is so dcrcrioran:d chat rotlll rcmov.al is ncccs.wy prior to �inting.
lhing chemical strippers p,imarily ro supplement offlcr methods such as ho.ndscraping, h:indsanding and rhc abovtn:c:ammcndcd thermal devices. Dct.achablc wooden clcmcnu such as Jhumrs, doors. and columN may-wich the pn,pa ,.rcgu.nb--bc ,1,m,;o,11y dip-,rripp<d.
Applying comp:ariblc paint co.iring systems following propcc surf.la:: prcp:aradon.
Preservation
NotRm,mmoukd
Using thermal devices improperly so that the hisroric woodwork i.s scorched.
Failing ro ncutra.liz.c rhc wood rhocoughly after wing chemicals so that new paint docs nor adhcn:.
Allowing detachable wood katura ro � coo long m 2 cawric solucion so dw: chc wood grain is raLSlcd 2nd chc sutf.a.cc roughened.
Failing to fallow m2nunautcrt' produtt 2nd applicuion instNerions when repainting cxcui01 woodwo&..
Preservation
Xcpainring wid-i colors rhac arc appropriarc to the historic building and district.
Ev.:duaring the cxl11ing amdirion of the wood to determine whether more chan pron:aion 2nd maintenance arc required, dlllt is, if rcpain to wood fca.Nrcs will be nca:aacy.
Rq,t,iri11i, s""1ilai11i, '""' fflllMni"f ftagilc wood wing wdl-tcsttd coNOlidanu, when appropriarc. Rtpairs should be ph)'Sially ...d voually tomf"'riblc: and idc:ntilublc upon dose inspc:crion for future racardi.
Rcpaiting wood features by patching, piecing-in, or Offlcrwi.sc n:info«ini; chc: wood using n:cot:"izcd prc,avation mcdwds. The new work should be unobtru1ivdy dared ro gu.!c future research and ncatmcnr.
Notll«omma,dtd
lJling new colors thac arc inappropriare co the historic building or di.strict.
Failing io undertake adcquare ma.sure& ro assure the prottetion of wood b.Nm:.
RA:moving wood thar ..,uld be nabaiu,d and Qlnacn,cd; or wing untested consolicbrus and unrn.incd pc,sonnd, 1hus causing funhcr damage IO Fragile historic marcriab:.
Removing wood that could be rcpaU't'd. using improper rcpau- co:hniqucs, or mlint tO document me rw:w wodt.
266
Preservation
Building Exterior
An:hitcc:tunl Metals: Ca.st iron, steel, pru,cd rln. copper, aluminum, and %inc
Recommmdai
ldmtifli11g, n1Aiui11t, tU1dprelmJU1garchitcctur.il mct1' features sod, as 1..-olumns, capi1als, window hoods, or stairways rhar arc imporWlr in ddining rhc overall historic characrcr or rhc building; and rhcir finishes and colors. Jdcntificarion is also criral 10 diffcn::miate bctwccn metals pttOf to work. Each metal h:u unique properties and thw requin:s diffcrcnr rrcarmcnts.
St11bilizi,1gdctcrioratcd or damaged architcetural mcrals- :as a prdimimuy mcuure, when necessary, prior 10 undcmking appropriate ptcSC.rv:i.1K>n wotk.
J>rot«ti11g mul mni1111W1i11g architcaur:il metals from corrosion by providing proper drainage so rhar w:i.tcr docs nor m.nd on Rar, hol"ftontal rurfuccs or accumulate in curved, dccorarivc lcan,rcs.
Oe1ning ;irchitcaural mcrals, when i!.pptopriarc, ro remove corrosion prior to n..-painting or applying ocher appropriate pt'Olectivc coatings.
ldcnrifying rhe particular type or ntct;U prior ro any cle-.i.ning procedure and rhcn tcsring ro assure thar rhe gcndcsr deaning method possible is selected or dc1cm1ining r�t dc;ining is inappropriarc fur the partkubr met:1I.
Nor &(Omm�nlkd
Altering architectural mcnl fcuurci which arc importanr in ddining che overall historic character or the building so rhat, as a rcsulr, rhc chancier is diminished.
Replacing histortC metal ftarun:s insrc:ad or repairing or replacing only the dcteriorarcd mccal.
Changing the type of finish or iu hisroric color or ac:ccnr scheme.
Failing ro nabili?c deteriorated or damaged architcctur.l mcrals until addirional work is undertaken. rhw allowing further damage to occur t0 rhc historic building.
Failing to idcn1\(y. ev11uatc, and near the causes or corrosion, such u moisture rtom leaking roof:s or gutten.
Placing incompatible metals together wirhout providing a reliable scpararion material. Such incomparibilicy can result in galvanic COn'O!ion or the less noble mctaf, e.g .. roppc, will corrode casr iton, steel, tin. and aluminum.
Exposing metals which were inrcndcd to be protected rn:,m the cnvironmcm.
Applying pa\llr or other coarings ro mr:ra.ls such as copper, bronze. ot stainless srcd that were mcanr ro be exposed.
Using deaning methods which alter or damage chc historic color. tc:<tun:, and hnish of the metal: 01 deaning when it is inappropriate for rhc mcral.
Removing rhc parina ofhisroric metal. The patina may be a protective coaring on some metals, sud, a.� bron1.c or copper. as wcll as 2 signilia.nr h�no,ic finish.
Preservation
Ocaning soft metals such as lead. cin. coppcc. tcmcpbce, and zinc with appropriate chemical methods because their finishes can be easily abr:adcd by blasting methods.
Using rhc gcndcsr d�ing mcduxls fo, cast iron, wrouglu iron, and stcd-hard metals-in order ro remove painr b\lildup and corrosion. ffhandscraping and wire bru,hing have proven incfkctM:, low pressure grir bl:u:ting may be used as long as \r docs not abrade or damage rhc rum.cc.
Applying appropriate painr or other coating systems after deaning in order ro decrease rhc corrostOn rate or metals or alloys.
Repainting with colon thar arc appropriate ro rhc historic building"' disnia.
Applying an appropriate protccrivc coaring such u lacquer to an archir:cccural metal feature such as a bronz.c door which is Nbjea to heavy pcdcsrrian use.
Evaluating rhc existing oond\rion of the architectural metals ro determine whether more dun prottaion and maintenano: art rt:qu.in:d, du.t is, if repairs ro features will be ncccs.wy.
NotRttommmd«i
Ocaning soft metals such as bd, rin. copper, a:mq,latc. and zinc wirh grit bias ring whie1\ will abr.i.dc rhc surface of du: metal.
l:ailing to employ gender methods prior to abrasively deaning casr iron, wrought iron or srccl; or wing high pres.sun: grit blasting.
Failing to rc-:apply protective roaring sys-rems ro metals or �loys thar rcquin: them after deaning so rhar acedcr.uc:d l'.X){l'O$ion occun.
Using new colors thar arc in:1.pproprl:lte ro dlC hlStoric building or district.
Failing to a.um pedestrian use or new accc:ss pattcrns so thar archin:ctunl metal fumucs att subject ro damage by use ot in:ippropri.arc mainrcnance rud, as $airing adjaccnr sidewalks.
Failing ro undcrakc adcquarc measures to assure the protccrion of ardiircctUral meal fcarura.
267
Jwpnin'ui, J/Abil11.i11r, ,md c-o1uen,iut fragile ard\\tOO:unl mccJJ using wc:11-tcstcd consolidants, when appropriacr, IIA:poirs should be physi<>lly and visu.lly compariblc and KkruLfi.abk upon dose inspection far futun: �n:h.
Repairing :ucl,itterural mer.ii (cuurcs by patching. piecing-in, or othcnvisc reinforcing the metal wing n:cogniud prtservarion met-hods. The new work should be unobttwivdy dated ro guide futun: rcscan:h and crc:ument.
Preservation
R,mov\ng anhit<CtUral menu mat could be ,..btJiud and conserved; or wing untcsrcd consoJicb.nu and untrained pcrsonnd, thus c:iwing further damage ro frasilc hisro,ic marcrials.
Removing uchircctural mcmls dm �uld be repaired, wing improper repair cechniqucs, or f.a.iling co document the new wo,k.
Preservation
nu folla111i11t work is h,tl,litf,ttd ro i,,dia,u rhttt it rq,�nrs rl,e prest dgm of i11rtrw11rion iaimt//y rrcunm,emkd withb, the m11rmmr Preservation. 11ud d,o,JJ ont, he considntd tlfitr prortttiott. Jtnbi(iu1io11, ,mJ rt.JNlir contm11 htt« bttu 11tlJrtaNJ.
268
Building F.xtcrior
Roof, N«om11M1Wd
Jda11ijjl11g. 1't11i11i11g, 1111d praa-11i11g roofi-and d,cir func• cionm and dccomi� fcaturo-chac arc impoctanc in defining chc over.JI historic characrcr of fflc bu.Jding. This includes chc roof's shape, nich as hipped, gambrd. and maruan:l. dee· onrivt bturcs such u Qlpobs. cresting. chimneys, and wcud,c:tvancs; o.t1d roofing mattrial Nch as flare. wood, day tile, and mer.al, as well as ia sin:. color, and p;xu:ming.
StabiUZl"111dctcrior.1.rcd or damatcd roofs as 11. prclimirui.ry measure. when necessary, priot to undcnaking appropriate preservation work.
Prcscnation
Altering chc roof and roofing maccri:lls which an: imponanc in dcfinlng the ovtnU historic chanctcr of the building so that, a.s a result, the char.u:tcr is diminished.
Hcplacing hutoric to0fing material irutcad of repairing or n:placing only the deteriorated mattriat
O\angjng the cypc or color of roofing matCNls,
Faalng ro sr.abilixc a deteriorated or cbma� roof unrU addirion:al work is undertaken, thw allowing further damage ro occur to the hisroric building.
hi, ftlrl,r,J,,,rl) ;,,,,.n,nu lo /mn"tlt ,nttlni,tls d1tt1 C'fmtrib111r" tt b11ildi11ti hiu.,k dMmtl(l', s11c/J ,u d,U hit,h/y 1/Ui/N sltt1t rt111/. /11 lbr rMII dJffl trp,,ir 11,,,,/ li111i1rrl rrpltt«mn.1 "" 1t«t11t1'J, ,JJ 11n11'f1r u,o,J,I JUtd lo 111111r/J lbt old r:wtl.,. Pl#t« Jrffer:,S. lninr.
Prcsel"Viltion
R«o111mr1wtl
Prot«ti11g,u,d 1 uaimJti11iuia roof by deaning the: gutttn: ,nd downspoua ,nd n:pl,cing dct<rior.mxl H..t.ing. Roof dic,thing mould .tso be checked for proper ..,,ring to prevent moiswrc condcnsarion and w:attr pcnctnrion: and to insure mat mattrials are me from insta inbtation.
J>n,yiding adequate anchorage for roofing marcrial to guard against wind damagt' and moinun: pcnctnrion.
l'rotcering, leaking roof with plywood ,nd building paper until it can be properly repaired.
Rq,4iri11t a roof by reinforcing; the historic: matcriab: which comprise rooffcacurcs using recognized preservation mah· ods. The now worl< mould be unobtrusi,dy d....l ro gu;dc future rcscarch and treatment.
Not �111 111t 1wd
Failing ro de,,n 11.nd maintain gurn:n and downspouts properly JO that water and debris collect and cause damage co roof F.un:ncrs. sheathing. and tbc: underlying srrucrun:.
Allowing rooffam:ncrs, such as nails and dip.s ro corrode so that 1oc,fing material is rubjca to iu:cdcmcd deterioration.
Ptnnitting a lcakUlg roof ro n:main unprocccc:cd to chat acedcrated dca:rior.uion of historic building materiab-masonry, wood, planer, paint and stnJctur.ll members-occurs.
Removing materials du.t could be repaired, using improper repair ra:hniqucs, or fa.Jing to doc:umcnr rhc new work.
Failing to rcwc intact slatt or tile: when only the roofing sub· nratc needs replacement.
n,, followint worlt u hiflJUfJ,m/ ro i11diaur dJtft it IY,/Jl"tmtO d1t f!ttllat tlq:,w ofi n1trwt1tio11 Kt1 1rnt/Jy mo1m11t1ultd within rlN trtntmtut Preservation, ,md1bo11/d onlJ bt co1uitkmJ eftrr prottttio11, stttbHUtltion, nnd rrJ>t(ir conarns httw bm111ddrtss«J.
269
Building &luior
ldemifyi,rg. ret11i11i11g. ,md pmrrvi11gwindows--.3.nd th.cir functional and dccornrivc fcaturcs-ffl:i.t arc important in defining rhc overall hismric char.mer of rhc building. Such fc:in1rcs c;m include fr.tmcs, s.uh, niuntins, gb:dng, sills, heads. hoodmokl,, panelled or ckconrcd jamb, and molclin&5, and interior and exterior shutters and blincb.
J� I
Preservation
Alrcring windOW$ or window brurcs which arc important in dcfinin& rhc hisroric clla-ractcr of the building so chat, as a result, the character is diminished.
Changing the historic appc;rancc of windows by replacing matcri;ils, finisho. or colors which noticeably change the sash, depth of f't'Vffi, and muncin configuration; the reflectivity and color of the glazing; or the :appearance of the frame.
Obscutinc: hiscoric window crim with mm.I or other mattrial.
Prnrrvin,. n lmi/Ain,.r h111ont 11111IIIOW1 r,mmtl1J i11vol11r11cmpin1., 111ntlint, mul r,-µ1t11i"f,. Whib10111r JTf}illr woN' will mo11li�/y W 11,u/m,,im 1111)/,in rbr npr of""''* on dm i,ut1lutlr1n.t1/ b1111di"I,, rrpl,,crmm1 of dtt windo,11 1111ilI i, umttU, not 1tn ,1pprr,pri,ttr PmmMlit1n trt'tttlt1m1, Plio111: Omd: Firhrr.
0
Preservation
R.tcomn,mtkt/
Conducting an indepth survi:y of the condition or existing windows early in prcserv:a.rion plutning so fflar repair and upgr:&ding methods and possibk replacement oprions an he fully explored.
$t4bi/Wlrg dctC'l'ioratcd or damaged windows as a preliminary mea.surc, when neccs.ury, prior to undertaking approprian:: pn:scmrion work.
Prot«ti11t mu/ ,NW111U11int the wood and archirtaural metah which comprise the window fume. mh, muntins. and surrounds through appropriarc Ntfu:c tn:annc:nr:s rueh as cleaning. rust remowl, limitcd paint removal, and. rc-applia.rion or proft'Ctm: coating systems.
Making windows wca.tltcrtight by re-caulking and replacing or irutalling weatherstripping. These actions also improve thermal efficiency.
Evaluating: the nuringcondirion of.materials ro dcttnnine
whether mort! tha.n prorection and maintenance an: required. i.e. if repairs to windows and window f'canircs will be required.
lup•iriNxwindow fr.uncs and sash by �tthing. piecing-in, coruolidating or othawisc rtinf"on:ing fflem using recogniml pn:scm.rion methods. The new work should be unobtrusively dated to guide future �rch and trcauncnt.
Not &rom1t1tndd
Replacing windows soldy bcausc or pcding paint. broken glass, fflldc. sash, and high air infilrrarion. These conditions, in mcnudvcs, arc no indic,,tion that windows arc beyond repair ..
Failing ro st:abilit.c :a deteriorated or damaged window until additional work U undertaken, dms allowing further damage to o«ur co fflc h"'Orlc building.
Failing ro provide adequate protection or m:1.terials on a cydic-.i.l basis so that deterioration of d\C window results.
Retrofitting or replacing windows rather than mamta.ining the sash, frame, and ghuing.
Failing m undc-mke adequate measures ro wurc the ptottction ofhistori, windoM.
1¼.ilin; tO protcet the hUtoOC. gb:zing when rcpiiring windows.
Removing material that could be repaired. using improper repair tcehniqucs, or failing to document the new work.
Failing co rcwc serviceable window hardwom: ruch as brass sash lifu and sash locks .
0 270
Preservation
Thr fo/k,wi1,g 111orlt is hit;hli1,httd ro indi(ttlt 1h111 ii rrprtttnl1 tlJt X,'tttltSt dr.vrt ofinttrvtn1io11 gtntrnlly rramm1tndtd wi1hiJ1 1h, tmumnu Preservation, and ,J,oufd onlJ bt ronsukrrd lfjrn-p10t«tio11. ttnbiliZ.1ttio11, and rrP4ir ronm,u httw bu11 ndtiraud.
Rtnm111lt'1111M
Limited Rcpla..:cmcnc in Kutd
Hepl.k:ing in kind !o!Xti:nsivdy J1.11.-rin�11:d or mWing 111m nf winJnws when then: .1rc st11"•iving pmtol)-pn such Ill IT-.tmi:s. �,. sil� gbzing, :ind hoodntold.,. 1� new wnrk ihnuld ffl¥'dt rhc nlJ in ntatcri.al. Jcsi&n, ,olor. .ind tomm:. anJ he unnbtnlMwclr d.2.11.,J 10 p1idi: l\lrun: IUC'ilin:h .1nd trenntcnt.
kcplilcing ,m L-ntire winJow whm limitL-J n:rl.1ccn1enr nt' dctcrinr.tt.. . .J and mil.,ing ft.UIS l) .arrropri.ur.•.
Usini; rcpbl.\.-ntr.'111 m,m.Ti.J 1hat 000 nm m.11d1 t� luunrk windnwi or failing rn rn,pctl)• dni.:umcnt the n1.-w \\'1'11k.
Prucrvation
R«on,nlfflMti
ldnuifli,lf, ,rt4i,u,11, ,u,d ,,.,,,.,;,,l enlTal1(0 and po,dic,and dteir funcrionaJ and dccorarivc fcaturu-mat arc important in defining the overall historic dwxter of the buildit1g such as doors, fwigha, ridcligha, pilanm. entablanuts, columns, balustrades, and stairs.
St,J,ilwnt dctcriomcd or damaged entrances and porches as a prdiminary measure, when necessary, prior ro undcm.lung: appropl'Utc prcstrvarion work.
Prot«tn,i a11d mlff1111W,U1t d,e mason� wood, and :architceNral mct:alr that comprise cntranca and porches rhrough appropnatt surface trcarmcnts such as deaning, rusr removal, limited paint ttmoval, and rc-appliarion of prorccrive roaring sysrr:ms.
Evaluarll'lg the existing: condition of m:urrials ro dcttrminc whether more dtan protcaion and maintenance o1rc requited, th.at is, repairs to entrmct :and porch features wm be ncctsSary.
Rq,,airiutcntnna:s and porches by rcinfo«ing the hist0ric mare-rials wing: recognized preservation methods. The new work should be, unobtrusively dated to guide fuNrc research :and tttatmcnt.
Altering enm.nccs and porches which arc important in ddining the overall historic d1ar:mcr of rite building so that, as :a result, dtc: dmacrcr is diminished.
llcpl:acing hUrorie c:ntralK'C and pordi fuaruttS in.stead of rciniring or replacing only the dcttrior.atcd material.
Failing to st1bili-Lc :a dctcrior:ucd or damaged entrance or porch until addirion:al work i.s undertaken, th.us allowing further damage to occur to the hUtorie building.
Failing ro provide :adequate protection ro m:arc:rials on :a cydal basis so thar dctcrionrion <i entrances and porches n=la.
Failing: ro undertake adequate measures ro assure the pror«rion ofhisrorie cnm.neCf and porches.
�ing material that could be rcpairc.d. using: improper repair techniques, or hailing to document the new work.
271
Preservation
71,c follo1uil11. HJOrk is /,ifhli,JJttd rr, i11dictt1t t!Jlft it rtprrstllts tht grtttttst dq:rrr of inttrw111Wn gmmrliJ rm,u1111e11dtd w1thi111/x trtat11w11t Praern.tion, ,md 1bo11ld 011/y bt cousidcmi ,ifttr prot«rio11, ,111b11imti011, tt11d rtJ>Nr courmu !Jttw bttu adJraud.
Pn:scrvation
Building F.mrior
R«o1111,undoi
J,k,,iifji11z, rw11ti11i11i, muJ pra,n,i11z norcfrontf--ilnd thcir functional and dcco�tiw: fcarurct--that arc important in ddining the o,cnll historic c:hu>act of the buildingauch as display windows, signs. doors, nansoms, kick plates, comer pma, and cnt2blarura:.
S,,rb;J;w,, dctcrio�n:d. or damaged nordronu as a prdimi· nary measure. when necessary, prior to undertaking appropri· ate preservation work.
NorH,,um.,.,.J,,J
Altering sto(Cfionts-and their fcacurcs---which an: important in defining the over.JI historic cha� of the �ilding so that, as a rault. the charxtcr is diminished.
Replacing historic norcfront fcatwU insccad of repairing or n:pl:acing only the dacriorua:d m,n,rial.
Failing to stabiliu: a dcttrior.r.tcd or damaged .storefront until additional wodc. is undertaken, thus allowing further damage to oo:ur to rhc: hutoric buildins,
Tix •n"ti,,,,/ fanN 111ul ftrt",m ef 1/JU Jj20, uMrft-111 l111w l,«11 rrt«intwl d,,.llfl, Pmtrwtti.n. PIJM: DttllitlW.1..-k. AJA
272
R«ommtndrd
J>rotn1i11g n11d m,r.UuttU1i11g imsonry. wood, and archirea:ur· al mcrals which compri.� srru·cfronts rhrough appropri:itc tn::umcnts such :u de:tning. rusr remov;il, limitcd painr remow.l, and rcapplic:uion of protcetivc: co.i.ting5)'Stcnls.
Protceting storefronts again."lt arson and va.ncbllSm before work begins by boarding up windows and doors and insrall_ing allltm systems rh:n arc keyed into loal protcetion :ascncu:s.
EY.iluarins the cxisrins condition of srorcfront materials ro determine wl\Cthtr mon: rha.n prottet1on and maintenance :ire n:quircd., that is, if rcpain to fum1rcs will be ncccw.ry.
Rrp11iri11gnon:fronts by rcinforcins dlC hismric materials ming n:cognrl.cd preservation methods. The new work sl,ould be unobrru1ivdy dared to guide: future racarch .md m:atmcnt.
Pruervation
Not R«a111111mtkd
failing ro provide adequate protea ion of materials on a eydi· cal baslS so that deterioration of nntefront fcuurcs results.
Permitting cnny into the buUd,ng rhrough unsecured or bro· ken windows and doors so that interior b.wrcs and finishes arc danugcd by oposun: to weather or vandalism.
Stripping storcftonrs of historic material such as wood, cut iron, tcrra cotta, camra glass, and brick.
Failing ro undertake adequate meanircs to as.sure the prctcl'V1rion of the hisrotic srorcfronr.
Removing material thar could be repaired. using improper rcpaic ccchniqucs. Of f.ailing ro documcn( the nc-w work.
The.follo,uin,f. 1110tl· iJ J,itl,li,(IJttd to httlic111t th,rt it rrp�nts the f!tttlnt dtf!tt ofir,urw1tri1m gtnmtU, rrcomr,,mdtd ,tn1hi11 rht trrrtlmntl Preservation, n,,d 1hot1ld only bt considrrrti nfter pror«rion, 11rtbi/U,lt1UJ11, ttnd rrfNtir conctmJ l,,rw bun ,uJdmstd.
&ro,,,,,,�,11,/
Llmitctl Replacement in Kind
lti:r(a&:ing in kh\J cxt1.,ui"d)' di.,cnnnc.:J nr missing J'ffl) nf �flri.:fmncs when: then: arc :wNiving pmt� sud, it' tr•n· )On\.\, kick plari:s. pilam.-rs. tw 1tcru, The ni.-w work shnu!J ma1d1 ,� old in marcrW�, d�'Gn, color, and rcxrurc; and be uunbtnssin:lr Jan.-J to guid� fuwn: rerc-.udt 11nd tn:J1mau.
Rq1t11;ing Ill\ 1.,nirc stnn:fronr "�11.:n limin-d rq,IJc:1.-mcnr nf dcfcrionh.-d and mi,J.ing pam iJ .irrropriarc.
Using rtrib1.'Cmcnt mat,:rgl d\ilt docs nnt marrlt the ltu,nril."' jton:fronr fi':ltute; nr faUinc ro properly dOl"l.lmcnt the new \\'\ltL
Preservation
&cor,,ment:kd
Idn11if.,i,,,, ·nlllUIU,z, "'"' protrun,, StructUral sysltn\Sand individual fcarurcs of systcms-d,at arc important in defining the overall hisroric character of the building, such as post and beam systems, tru.uo. summer� vigas, case iron rolumns, abovc·gradc stone fuuncbrion waJh, or load· bearing brick or stone w:alls.
�iliw,.rdcttrioratcd or cbmagcd nruerural sy5tcnu as a ptdiminary mo.run::, when necessary, prior to undcn::ilcing appropriarr pttSCMrion work.
Protectblf ,u,d tnltn1tAinU1t the structUral system by deaning the roof gutters and downspouts; replacing roof flashing; keeping masonry, wood, and archicccruril metals in a sound condition; and ensuring that srruaural mcmbcn a.re fnx from insect inkuarion.
Examining and evaluating dtc existing oond.ition « the strue� tun! system and its individual fcarurcs using non.«Struetive rrchniqucs such as X·ray photography.
Not lvcdn,,,unJd
Altecing visible brurcs of hisroric sn:uctural systems which arc importt.nt in defining the ovcrull hlStoric char.u:tcr of the building ,o thar, as a result, the dtaracttt is diminished.
Ovcnoading the existing muctun.l system; or installing equipment or rncdunical systcrru which could damage the structure.
R,placing a loadbc,ring masonry will tha, a,uld be augrncnttd and mncd.
Leaving known stNCNral problem, untreated such as dcA«· rion of beams, aac:king and bowing of wall,, or racking of structUral members.
Utili7.ing trc.tmcna: or producrs th:tt a.ccclcrarc dlC dcttriora· rion of srructural man:rial sud, 2' inrroducing Urtll·formaldc· hydc foam insulation into frame wall$.
F.iiling ro nabiltZC :i deteriorated or damaged structural sys· rem until additional work U undertaken, thlu allowu'C further damage: to occur ro the hurorie building.
F.iiling to provide proper building mainn:n�ncc so that deterioration of the muctural J)l1tcm results. Causes of dcteriora· rion indudc subrurfac:t ground movement, vqctanon grow· ing too d05C to foundation walls. improper grading, fungal rot, and poor interior vcntilarion rhat results in condensation.
UtilQ.ing destructive probing rcdmiqua that will damage or cbm,y nruaur,J m>u:rial.
273
&JN1iri11t d\C scrucrural syitc:m by augmcnring ot upgr.Ldin; individual parts or fui.Nrcs using n:cognrx.cd prcscrvarion mcthocb. For example, M:11kcncd sttuaur.il membcri such as floor fmnin; an be paitcd with a new membct. br.accd. or ochccwisc Npplcmcntcd and reinforced.
Preservation
Not Hltomm,,wd
Upgrading d\c building suuccurally in a. m:mocr that diminishes fflc historic charaac, of the cxtc:rior, such as inst:alling strapping channds or removing a dca>rativc cornice; or dam:iga interior facuccs or spxc:s.
Replacing a SCNctuml member or other brurc of the mucwral sy.ncm when it could be augmcnrcd and main ed.
71J, foUotuil'1, t110rk is liithlitlllld to indiartr 1/Jnr it rrpmmts rht pitst dtf!tt of bum,mrion xr11rm!IJ rrco111111mtkd wir/Ji11 rht trtnhlttllt P""rva1lon ,md sho,Jd bt 011/J bt co1uultrtd 11.ft,r prottcti011, ttAbilir.Atio11, 11nd rrjlllir toncmu h,,w btt11 dd4l'tmd.
Preservation
Building Interior
Spaces. Fr:aturcs, and finishes
&co,un,n,drd
l11taiorSp,,us
Jdff1ti/fa11, nlltinuti, 11,d pmn'tlillt a Aoor plan or interior lpaccs that an: important in defining: the OYC:rall historic character of ,he building. This indudcs the srtt', configuration, proportion, and rda1i0nship of rooms and corridoa; du: rdarionship oFfuuu..,. ,o spoco; and the spa=,� such as lobbies. n:a:ption halh, entrance hills, double padors. thcatc:rs, auditoriums, and important Endusaial or commercial sp=s.
Vlrrfid ,l«11111n1l#lli•11 •/ 11 lmildint.} pbpi�/ m,,/i1i-,, i, d,r criliad fi11111q i11 tittt't'tlWINIK ,,,, lf,,-,nil1t Inn efi•iawu,;,,," (If) no ,,wyindn,l,lffltmtrhcln:dorimlrrnrd,1,t:ialtilttmttltnllls1111A fott11m; r,r (II) ,loc,1mm1i11ttt p«r1in1fllr prr,l,lm, md11u UJ,I rmdml mU,.,_, Pl,.,,/,), j,wu E. r,....,,. P/J«, lb).- /.« fl. Nd,,� FA/A.
Al<tring a floor plan or interior ,paca--induding mdividu.J rooms--which ate important in defining t:hc overall hisl'Oric character of du: building so dm, as a result, me character is diminished.
274
R«ommcnded
lnn:rior Features and Finl.shes
ldeutijj,fog, nrai11i11g, ,md praervU,g interior foarurcs ;ind finishes that arc important in defining the overall hi.storic du.n.cttr or d" buikling. including columns, comica, �boards, fireplaces and m:mrds, p-.1.ndling, lighr 6xNrc.s, hardware, and flooring; and wallp-:apcr, plasrcr. paint, and finishes such u stencilling, marbling, and graining; and od\C'r decorative materials that :\CCCnt inrcrior fcaruros 2nd provide color, n:xrurc, and pamming to walb, Aoors, and ceilings.
Stabilizt'ngdctcrioratcd or d:.amagcd interior lcarurcs and finishes .as a pn:liminary mc-.uurc, when n«:em.ry, prior to undcr�ing ;ippropriatt prt$ervation work.
Prot«ti11g and nUU11tai11i11g masonry, wood, and archittct\lral 1nct1.ls rhat comprise interior fcarurc:5 rluough appropriate rurfacc m:.umcnts mch as cloning. run ttmov:a.l, limited paint removal, and rc:i.ppliarion of protcaivc coating sysn:ms.
Prcscrwtion
Not R«ommtmhd
Aln:ring fc:arun:s and finishes which an: imponanr in defining the ovc�l historic duraacr of d\C building so that, u a result. the character i.s dimin\Shcd.
Replacing historic in1trior features and hnishc:s instead or n:pairing or n:placing only the deteriorated masonry.
lnsraHing new decorative man:rial thar obscures ot damages ch�ctcr-dcfining in1trior features or finishes.
Removing historic finishes, such as paint and pla.ncr, or historic wall coverings, ruch as wallpapcc.
Applying paint, plasn:r, or other finishes to surfaces that have been historically unfinished.
Sttippill£ painr to ban: wood tather ,han repairing or reapplying gr;ined or marbli:d. finishes to fcarun:s such as doors and paneling.
�nging the type or finish or iu: color, such u painting a pn:viously vamishi:d. wood brun:.
failing ro stabilize a dcrcriotatcd or damaged. interior fnturr or finLJh until additional work i.s undcnU,cn, thw allowing further damage 10 oca.ir ro 1hc historic building.
foiling to provide adequate prorcction to ma1trials on a cyclical basU $0 that deterioration ofinn:rior !nturc:s resulu
Pmcrvation
&ct,nmlmlkd
ProfCf:tlng inrerior fntures and finishes against aC$0n and v.andalLSm befon: projccr work begins, boarding-up window$, and installing firr alann systems rha.r arc kcyc:d ro local prot«tion agencies.
l"rottcting inrerior fntum such as a m.in:asc, manrd, or dccora1ivc finishes and wall c:ovtrings against damage during project work by rovcring chem with heavy canvas or plasric sheea.
Installing prottttivc covcrinp in areas of heavy pcdcmian traffic to pron:ct hisroric features such as wall coverings, parquet Aooring and pandling.
Removing d:unatcd or deteriorated paints and finUhcs to rhc next sound layer using the gcnrlcst method possible, 1hcn n:painting or refinishing using compatible paint or other coaringS)'Stcmt.
Repainting wirh colon that arc appropriate to the historic building.
Limiting abra.srvt. deaning mcrhods to certain industrial warehouse buildini;s where the Ulterior masonry or pbstcr features do not have distinguishing design, detailing, tooling, or finisher. and when: wood features arc not finished. molded, bc>dcd, oc worked l,y hand. AbrasiYc clcaning ,hould only be considered after other, gender methods have been proven incffi:-ctivc.
Evaluating the c:x.i.uing condition of materials to determine whether m� than procccrion and maintcnana: arc n:quln:d, that is, if repairs ro interior b.turcs and finishes will be ncccs"IJ'·
0
NotRlcommffllUd
Pcnnicring entry into historic buildings through unsecured or broken windows and doors so that the interior features and finLShcs arc damaged by exposure co weather or vandalism.
Strq>ping inl'ttiotS of features such as wood-Nork, doors, windows, light 6.xtun::s, copper piping, r.ldia.tors: or of dccomivc materials.
Failing to providr: proper protcctlon of Ulrcrioc features and finishe!S during work so rhat dlC)' an: gouged, scratched. dcnrcd, or otherwise damaged.
Failing to rake new we patterns into C'Oll$idcration so that interior features and finishC$ arc damaged.
Using dcstruerive ma:hods such as propane oc butane ,orches or sandblasring to remove paint or other coatings. These mcd1ods can irreversibly damage the historic materials t'hat comprise intrrior features.
Using new paint colors that an: inapproprLan: to the hi.sroric building.
Ou.nginc the tn:rurc and parina of charactt:r-dcfining fc:atun:s throuch sandblasting or we or abrasive methods to remove paint, discoloration or plaster. TI1i.s includes both exposed wood (including strucrur.d members) and masonry.
Failing co undcm.kc adcquan: mcasun:s to assure t'he procccrion of interiot karurcs and finishes.
275
Preservation
Nor &co111111t11dtd
Rt/J(tiriug h"'-oric interior fcaturc:s .and finUhcs by rcUlfaccing chc m2rcrials wing rccogniud prc$CMltion methods. The new work should m;itch the old in material, design, color, :ind rcxtun:; and be unobuusivcly d.ttcd to guide future f'CSQrch :.ncl UC:U.mtnt.
Removing marcl'WS that could be rqnin:d, wing impcopcr techniques, or Failing ro documcnr chc: new work.
/11 Pmn,,,,1iw1, ,m t1p/FPpri1ttr kw/ ef'i111tr11n1lion U at11l1/iJd }rior 10 w.d: i11 owln to 11111Ximiu rmn,i.n ofbtit.ri, JMtfflAJ,. (,f) A nnu,m,,,uor U111JKPnt,,,/bniw,. 19'1, cmtl1fJ<0mp.,,i1,.n OmdtUnl1 llldt b,a tlfWHhMltdftom ;u wood 11",,r,,rtt. (/,) Tlw c-.,np. fo,tmmt U mrrfi,lfr /,d,i in p/d« 1m1il 1/� 'l";r/:-.m1intttdhaiw IMn hold. Pl,010,:Jwurt/Jlf,i 11/QmlM.
Prcscrvatton
nu foUo,uinr. work is bithfit,hrtd ro i11dimtt dw it rrprm11ts ll# trt«ta1 dq;rrt of imnwnt�11 xe111mU, mo111111t1ukd within rht m11tm�nt Preserntion, 1tnd sho,Jd M/y bt '°miitml lffitr pm«tion. JfAbiliz,,ttion, ,md Tr/"'ir am«nu bd11t b«1111ddmstd..
276
Preservation
Building Intcrio.r
M«haniad 5y,,=r. 1-fcacing, Air ConditioNAg, El«ttical, and Plumbing
Jda1tifyiJ11, rtllUuWi, ,md JrrKrt1fog visible fcacun::s of cady mechanical .systcnu fflllt arc important in defining the overall hisrorie characn::r of the building, such as radiators. vcna, liin,, grilles, plumbing Jun,,.., ,,.;«l,plarcs, and lq;hi,,
Slnbiliri11t deteriorated or cbmagcd mechania.l sysrcms as 11 preliminary mc:i.surc, when nccns:iry, prior to undcruking approprian:: prcscrv.:i.rion work.
/'rol«tillt 1111tl 11111;,,w,,u,x mcchanical, plumbing, and electrical systems :ind their features througlt cyclical deaning and other appropriate mcasun:s.
Preventing accderatcd deterioration of mcdlanical systems by providing adequate ventilation of atria. mwlsp;1ca, �d cdbrs so fflllt moisture ptoblems arc avoided.
Improving the energy efficiency of cxisrin; mechanical systems to help n:duc:c: the need for dabor.uc r\C\V equipment.
Rq,airi11gmcd,,anic.il systems by :iugmenting or upgrading syncm pms, sudt as insralling new pipes and duca:; rewiring; or adding new comprasots or boilers.
&plir�int in kind those visible b.tun:s of mechanical sys rems dt1t an: either extensively deteriorated or ate prorocypcs such as cr:iling faru. swirchplotcs, �ators, grilles. or plumbing fixcurcs.
Not R«onmmwd
Removing or :iltcrin(; visible fcarurcs of mechanical sysrcnu that ate important in defining the overall hinoric charaatt of the building so dut, as a rcsull, rhc character is diminished.
Failing to srabilit.c a dcterioran::d or damaged mechanical S)'S· tern until :id.dirional work is unck:rakcn, thw allowing fur. <her damage ro oa:u, ro the hisrorn: building.
f-ailing to provide adequate protccrion of materials on a cydial basis so th.it deterioration of medunical systems and their visibk fca.tUrcs rcsulc:s..
Endosing mcchanial systtms in art:l! thar arc not adequately ventilated so mar dctcriorarion of chc systems raults.
Installing unnccnsary dimate control sysrcma: which an add excessive moisrun:: ro the building. This addicional moistute can either condense inside, damaging interior surfaca, or pass through interior walls ro the exterior, potcntially damaging adjaccnr matcrtals as it migr.ucs.
Replacing a mccha.nical system or iu functional paru when it could be: upgrulc:d and tctaincd.
lnsmlling a visible rcplaccmenr fc..Nre that docs nor convey the Ame visual appearance.
Preservation
Tb, follow int "1ould � consida-rd in t1 P,acn,ation proj'«t wlu11 tlM i11tr11/IAtion of ntw 111«h1111iml tq11ipmmt or IJJUIII is rrqlUrrd '" n111ltt the buildi11xfiulm'111,d.
-
� ... -----���=ii-��� ... �
277
Building Site
&romnundtd
ld�mifyb,g, n111i11i11g, a,u/ prt1tr1Jillg buildings and their fca. turc.s :is wdl ;\,'I fc.trurcs of the sicc that ace important in dcftning iu overall hisroric character. Sicc bturcs may include circul:nion sysccnu such as walks, path.�. roads, or parking; vegctlltion such :is trees, shrubs, fields. or herbaceous plant marerial; l:i.ndforms such :is terracing, berm, or grading; furnishing, such as ligha:, lt:necs, or benches; decorative clements such as se\Jpture, statuary or monuments; wa.rer ti:arurc.s including fountains, srrca.m,, pool<, or I�; and subsurfucc archcologi<=:11 features whid, arc impom,nr in defining the history of rhe me.
Retaining the hisroric relarionship bccwecn building, and the landscape.
Stabi/w11gdctcrioraccd or damaged building and sire 1-caturcs as a prclimin,1,ry mcosurc, when necessary, prior ro undertaking :i.pproprr.lrc pracrv:uion work.
Preservation
Not Reronmundul
Altering building.s and their features or site fcarurcs which arc impomnt in defining the overall historic chanacr of the property so that, as a rcrulr, the characccr is diminished.
Removing or relocating buildings or landscape features, thw destroying the historic cclatiomhip bcrwccn buildings and the lanchcapc.
Failing to srabilizc a dcteriorarcd or damaged building or sire fo:nucc until additional work is undertaken, thw allowing further dam;gc to occur to the buildingsitt.
D"dJIOn Ht,11. rJM1' 0,,,r/nl()II, So111h CtrolirJJt, i, All rxrrllml txltnl· pk of ,m rlltliwd J8U1 rrn111ry pl111111t,1a11. Of pttrt1r11/,,r nolt in UIU Jho""f111pltttrrlNlnMJr�for,mr1ttd,lrdin llKlnlt }�tfflU� ti rrj{tttint pond ttntl rotL momul. WiJ, ,m owmU Prtwmlion l1'ttll· mml p1"11. tlu� '4.trr fot111,n hdw lwn rr111intd ttnd prot«k'tl !f d Rntomuon tm1tmm1 h,,tl bm, ,d«IM, IAtrr fo,1111tt of tk lmulsat� N wtU ,u r/,lfnt,n lo U,t '1011,r iw11U lllfw bttn rrmolltti. Pl,010: C.11rtn,. NtuiotMI Tr,,11 for HU�rrr P'rnt'l"llttlion.
Preservation
RBammmlUJi
Prot«ti111 ,.,,d m,u"11uti11U1g buildings and siru by providing proper drain• ro assure that warcr docs not erode foundarion walls; drain awnrd dlc building; or damil£( or erode the l,ndsapc.
Minimizing disrurbancc of terrain around buildinp or elsewhere on the Jiitc, thw reducing the possibility of destroying or <Umaging impocnnt land.sapc btur-cs or archcological resources.
Survqing and documenting areas where the terrain will be altcttd ro determine the potential impact to import:a.nt land-5C:apc lt:aru� or an:ncologica! resources.
l>rotecting. e.g., preserving in place, impom.nt arthcological ttSOUrttS.
Planning and carrying our any necessary lnvcsrigarion using pmltssional an:hcologim and modern orchcologial mcd1ods when prcscrn.tion in place is not fca:i:iblc.
l'ractving important bndsc:apc fcarun:s, including oni;oing maintenance ofhisroric pJant material.
Proa:cring building and landscape fuaturcs acainn arson and vandalism before prcscMtion wonl begins, i.e., cn:aing prorec,ivc fencing and installing alarm systems that arc keyed inro locaJ ptorcction agencies.
Providing conrinuttl protection of hisroric building marcriab and planr "=�turcs through appropriacc do.ning, cwr rcmoval, limitc:d painr removal, and rc-applicarion of pl'OCC1:tivt coating systems; and prunlng and vegetarian management.
Nothmmmditd
Failing ro maintain adequate sia:: drainage so rhat buildings and site fcarun:s arc damaged ot dcnroytd; or ala::mitivdy, changing the sicc gnding so that waccr no longer drains pmpcrly.
Introducing heavy machinery ;nto areas whccc ir may disturb ot damage impom.nt landscape fca.turcs or archcological ICSOUrtts.
Failing m survey the building sicc prior ro beginning work whim raula in damacc to, or <btruction of, imporcmt J,ndsapc: fcatutcs or aidu:oJog;aJ rcsouro:s.
Leaving known arch.cological maccrial unprotcctt:d so th�t it is damaged during pn:savation work.
Pennitting unqualified personnd ro pcrfonn data rea,vtry on arthcological resources so that improper methodology rc.rula in die Joa ofimponanr archeolOGic:al material.
Allowing important landscape fu.rurcs robe lost or damaged due to a lade. of ma.intt:nancc.
Ptnnirring the property to remain unrmcctcd so that the building and landscape fcarun:s or archcologial r<soura:s ,n: damaged or destroyed.
Removing or dcmoying features from the buildings or site such as wood $Kim£, iron fencing, masonry balustrades, or planr marcrial.
Failing ro provide adcqlWe protection of IT'tlcttials on a cydic:al bcuis so rhat deterioration of building and site fa.rurc results.
278
Rtt,mm1endtd
Evaluating rhc cxi.ning condition of marcti:W :ind fcarurcs to dcmminc whc1hcr mon: than pro1cction and maintenance arc required, 1h:it is, if rcp-.1irs to building and sire fcamres will be ncccSS.try.
RepiUriui bNrcs of the bui\ding and sire by reinforcing historic materials wing rccogni1.cd prcscrvl'ltion methods. nu:
new work should be unob1msivdy <b1cd to guide furore rac;i.rch 2nd m:2tmcn1.
PrcservatlOn
Not &roninumkd
Failing to undcttake adcqua1c measures to assure the protC:etion of building and si� features.
Removing marerials dm could be repaired, wing improper rcpait techniques, or fuiling to document the new work.
Tht fol'4wint ,writ it hitl,h.°x/,ttd to rndirtttt llNlt it rrpratrm th< ptttat dq:rrt of int trvrn11011 gmtmll.y rm1mmt11dd. withrn tht trtntmtnt Preservation, ,md Jhould only ht conridtrtd njrtr prortct1on, sMbWuttion, ttnd rtpair conurm haw bttn nddrtsml
Limi1cd Rcpbccmcnt in l\ind
"1.l)b.i.ng in kinJ Olt1.-nsM.-lr J1.'tctinr.utd nt miuing p,iru nr 1hc building nt sire where rlrcrc';m: surviving rmto� such .u p;n nr .a fuut1tiltn. or pnrtimu nf .1 wiilkw.ay. New wnrk sl'ffl.lki n\an::h 1hc r4d in m2n:1ials. Jaign, color. and t0.1urr; ,md l� unnbtnuiwly da11:J to suidc fucun: n.Yo1rrh Md ttt;lt• n,cnt.
NotA'('((tmmn,d"'/
Replacing an 1.'ntirc h.!.atul\' of 1he building nr si1e when limit-1.-J· n:pl2ccment of dcminr.11cd ilnd mining p.am LI IIJ>rmpri:nc.
Using fl'J'Lu:cmcnr man:ri.11 Wt Jocs nnt mah:h 1hc huildin� sire fuan1rc; ot hiling to rmpcrly dncumeni 1M nL'"' ,\'Ofk.
Preservation
Setting (District/Neighborhood)
ivtommmdd
!dtutif,U11 rtt1tUti11t, 1r1uJ jrmn,Uit buildinc and landscape fcarun:s which an: impomnt in defining the histotic characrcc of the $Cfflng. Such features can indudc to:lds and sh'tta, furnishings such as lights or benches, vcgcrarion, gan:kns and yards, adjacent open space such a.s fields, parks, common.� ot wood'2nds. and important views ot visual rdatKHUhips.
Rct2ining the historic rda1i�nship between buildings and landscape fcarurcs of the $Cthng. For example, preserving the tdationship betwc-cn a toWn common and its adjacent historic housa, municipal buildinp:, historic roads, and landscape karurcs.
S<ahilw,,1detcriora..d or damag<d building and landscape fuaNrcs of the setting a.s a preliminary measure, when necessary, priot to undcnakinc appropriare preservation work.
Prot«ti11g mu/ nuiinlluJW1i hi.sroric building materials and plant features through appropriate deaning. rust removal, limittd paint rr:� and reapplication of protective coating systems; and pruning and vcgct1tion manaccmcnt.
Prorectlng buading and landscape fcarun::s against arson and vanc:blLSm before pracrvation "WOrk begins by crcaing prorectivt frocing and insa.lling alarm symms that an: lttycd into local prcscrvarion agencies.
Evaluating the o:isring condition of the building and landscape features to determine whether mon: than protection and maintmanct a� required. that is, if repairs to karurcs will bt ncccwl)',
Not flm..,imd,d
Altering rhose fcaN"'5 of chc setting which arc important in defining the historic d,aracrcr.
Altering the relationship between 1he buildinp: and landscape: features within rhc setting by widening cxLSting meets, d1anging landscape: materials, or conmuaing inappropti2tcly located new sm:cts ot parking.
R.cmO\l'ing ot rcfocaring hi.srorie buildings or landscape fc1. Nn:s, d,,us &sm,y;ng thcir hi.noric rdationship within rhc setting.
r�ilint: .. srabilitt. dcttrioratcd ., damaged building .. landscape katurc of the: setting until additional work is undertaken, thus allowing further dami.gc to 1bc sc:tring to orou
Failing to provide adcquarc ptotcccion of marcrials on a cyclica] hasU wliich results in the dcretior:irion of building and landsapc fuuurc<.
Permitting the building and setting co remain unprotccrcd. so ma, intcriot 0( orcrior fcatucts are cb.m�.
Stripping ot removing features from buildings nr d1C .setting such as wood .siding, iron fencing. rcrra com. balwrers, Ot plant ma.renal.
Failing to undcmkc adcquatt: mc:uurcs to as.sure the protection of building and lanCUcapc brurcs.
279
Hep(l.iri,1t fuin1rcs or the building and l:indscapc wing rccog� nizcd prcserv:ition methods. Tite new work should be unob,, rt1uivdy d:ited m guide furutc rcsc;trch and ttcannenr.
Preservation
Removing marcri:il thar could be repaired, wing impropct rep-o1.it rechniqua, o, fu.iling to document the new work.
Thr follow int ,uork is hi,!Ji,(ltttd brcttim it ttprmnn tht ,:rtt1tnt drgru of inrrr11mti1m u1wtt/Jy rtr0tnmmdtd wishin dtt trttttmrnt Pn:Jtrv.uion, t1nd thould onlJ lu tonsilUrtd ,rfin prottcrion, 11ttbiliutio11, ttnd npttir tonrrrns hnut btm ndJrtu«J.
&Tr,mmrmlrrl
Limi1cd llcplaccmcnl. in Kind
�ilJ;Lt.-ing in kind o.t1.,uivd)• d..'f\.•rior.ucd. or miuing �rts of building 11.nd lamBQpi: IC".uul'C\ when: then: 11.n: sun·iving pNh'IC)'f'O- n1ch as rw,n.:h b;.lusmdcs nt p;aving man:rials.
Rq,bcing an cn1in: fc:K\m: or d\C building Of bndsc.l.,._: \\-hro limitaJ n.'fll;&a:mcnt of ds.,1.-rinro1.t,.-d and mWiing ('I.IIU l\ .irrropl'\:m:.
l.Jqn& rqtbct."fflalt m:m,.'tUI th.it dno nnc m.uch 1� huilJirl(!, nr l.and.�p:- ft.a1u, .. -; or fu.iling 10 pnp;,ly J(ll.'Untenr th.: n-.:w wutk.
Tht pl of Pmtrwru'on iJ to rtll/in thr hiJtorit farm, mtttrrittb., ttnd fidt11m of tk l,uil,/int dnd ilJ 1iN 11111,q htf11t 1M11,,,,t-.r twlwd-lllll'rtimt. ThiJIMnkbnmu.wrl,11ilsintbtJB20t.lM'ft mln,xr,{ i11 1898 and r1ttri11 m 1914. Tod9 it rtmlin,111 ill rolr di a wo,lunx.forn, rtn,a,n-r di ti midi ofstmiliw prntrwr1io11 work. Tlr,i inr"ulM fo11nddt1on rr-p,dilffl d MW 1111ur IJlltm; 1tn,c1r1ml 1tmtr;tl,tNn,:IIMrrp/Nnnm10/All'llml.,littmon1udmt11tlroof Phot,:J,rdr E. Ro,1tkr. HA&:
Preservation
0 0
Aidto•rJ, th,work in thtfo/J,,wurg1«ti4111 uqui:,oft,nm, import411t11Jp,ctofpmmMtum proj,ct,.#i1111•.0,Mtp,utoftht or><mll P'°'"' ofpm,n,int dNUtU:r,r-d,fountft/111= (m,u,rrmmrtt, rrp,ur, ttnd /jinit,d rtpwtnunt); rather, wch work u""""" far if1 potmtud ntgativt im/'IU'f on the buihlingi his/lJrir charlldn'. For this ff4S4n, partirulAr tdrt muJt be Wm N}f to obmut, ,titer, or d.tltt1Tft d11rmtter-deft11U,gfi«1Hrtt U, tltt pro<ns ofpmnwtUm """"·
Energy Efficiency
FINommmdtd
M,uoury!Wood/Artbit«olN! M,t,,/s
Installing dtanul insulation in atria and in unheated cellars and a,,wlspaa:s to increase: the efficiency nf the existing mtthanical iystcrN.
Installing insulating material on the inside of masonry walls to inelCUC energy efficiency where there is no char.M:tCt� defining interior molding around the windows o, other intcriot uchitccrural dcta.iling.
Wh,doWI
UtilQ.ing the inherent cncri:r corutTYing b.rurcJ of a building by maintaining windows and louvered blinds in good operable condition for natural ventilation.
Improving thermal efficiency with wcad1crsttipping, storm windows, caulking, inn:rior sludcs, and ifhisroriolly appropriate, blinds and awnings.
Installing interior stonn windows with air-tight gaskets, vm� tilaring holes. and/or rc�c dips 10 insure proper mainttnano:: and ro avoid condensation damage ro historic windows.
Installing exterior stonn windows which do not damage or obscure the windows and frames.
Not R«ommmlkd
Applying dtcnnal insulation with a high moitturc content in wall avitics which may damage historic fubric.
Installing wall insubrion without considering iu eff'cct on intc� rior molding or other archircaural detailing .
Removing hUtoric shading dcvitts: ntM' d1an kttping them in an oprrablc condition.
Replacing historic multi-paned sasl, with new dtcrmal sash u(i.. littng false munrins.
[nstalling interior ,tonn windows ch.at allow moisture to accumulatr and da�thc window.
lnmlling new atttior stonn windows which :,,re in:1ppropt�tc in sitt ot color.
Replacing windows or transoms with fixed thcnnal glazing or permitting windows and mnsonu to mnain inoperable rather than urili?.ing than for thcu energy conserving porcnria.l.
280
Rm,mmmd,d
Eutrmuts ,u,d Po,-chu
Mainr.iining pordu:s and double vestibule entrances so d,at dlCy can retain heat or blnck d,c S\ln and provide natural vcntib.tion.
l111t1·ior Nt1h1rts
Retaining historic interior .dmttcrs :1.nd tr"nsonu for their inherent cncrsr corucrving fomna:
M«IJ1mitnl Systn11s
1mproving energy efficiency of existing mcch:1.nial systems by inst:tlling iruulation in attics and b;u:cmcna.
JJiuuli11g Sit,
Retaining plant m:tterials. trees, and landsc:,pe: featurc:s which perform piU.<ivc solar Cllctgy functions such ;i.s sun shading .tnd wind breaks.
&11i11g (DistritJ/Neighborhood)
Milinti.ining thnsc cx.i.�ring landsC.lpc fC:l.turc.( which moderarc the effects nf the climate on the setting such as dcciduow rrccs, cvcrgrt"Cn wind-blocks, :.ind l:tkc,; or ponW.
Preservation
Not R«ommtndtd
Changing the historic appearance of the building by enclosing pordtes.
Removing historic interior fcarurcs which play an cncq;y conserving role.
Replacing existing mcch,mica.l syncms that could be repaired for connnucd we.
Removing plant materials. tctt5, and lanWcapc bturcs that perform passive solar energy funa,ons.
Stripping the setting oflandsc:apc fc:trurcs and landforms so rh:a the effects of wind, rain. and sun rcsulr in accelerated deterioration of the historic building.
Preservation
Accessibility Considerations
11,co.,,,.,,uJ,J
Identifying the historic building's eharactc,-ddining spaccs, fcaturcs, and finishes so that acc:cssibiliry code-required work will not n:suh in ihcir damage or lo.u.
Complying with barrier-fret access requirements, in $Ueh a manner that character-defining sp«es, bturcs, and finishes arc praervcd.
Working wirh local disability groups, acccs, specialists, and historic prcxrvarion specialists ro dcttrmine the most appropriarc solution to access problems.
Providing barrier-free ac:ccss that promota independence fur the dinbkd person to th, highest dq;n:t: p<Xtiabk, whil, preserving ,igniliant historic fcarurcs.
Findinc solutions to meet acca.sibility n:quircmcna that mini mite the impact on the hll1oric building and its site, such a.s compatible ramps, paths, and lifts.
N,r/lnommmJ,d
Undcruking code-required altcrari9ns before identifying those spaces, fcaNrcs, or finishes which an:: d,anacr-dcfining and must t!=fotc be P�-
Alttring, damaging. or dcrttoying d1ar.mcr-dcfining farurcs in ata::mpring a, comply with acccs.sibiliry requirements.
Making chances to buildings withour first scdc.tng expert advio: frmn accc:ss specialists and hlltoric ptcJCN1.rioniJrs to determine solutions.
Making ac:cr:ss modifications that do not prov.de :l rusonable balance bttwccn independent, saf'c access and preservation of historic features.
Making modifications fur acct:ssibiliry wid10ut considering the impaa on the hi.stotic building :i.nd its site .
281
Health and Safety Considerations
H«r,mmtndtd
ldcnrifying the historic building's charaaer-definins spices, fui.Nrcs, and finishes so that code-required. work will not n:suh in their darn.age or loss.
CompJying with health and sakty codes, induding sWmic code requirements, in such a manner that characrcr-dcfining spac:cs. brurcs, and finishes arc: prc:sc,-,,cd.
Removing toxic: building materials only after thorough test· ing 1w been conduacd and only after less invasive abatement methods have been shown to be irw:lcquatc.
Pruviding workers with appropriate personal protcaivc: equipment for hax.'ltcb found in the work.sire.
Working with loc:al code officials to invcutgite .IY'fCfflS, med,ods, or devices of equivalent or superior cffccrivcncss and sakty to those prescribed by code 10 that unnecessary aher.uions an be avoided.
Upgmding hist0ric stairw:ays and elevators to meet l�th and safccy codes in a m�ncr that assures rhdr preservation, i.e .• so dur they arc: not dam.lGCd or obscured..
lnualling scnsimidy designed fire: supptc:uion systems, ,uch as sprinkler systems that n:sult in retention ofhistotic bNrc.s and linishes.
Applying firc-rc:t:1.rdanr coatings. such as intutnact'C\t paina, which expand during fire: to add thermal protcc1ion to srcd.
Adding a new st.1.irway or dcvatot to meet health and safety codes in a manner d,ar preserves adjacent char.actcr-dcfining fu.Nn:s and spaces.
Prcscrvatlon
Not Recom111t1ukd
Undcrtalc.ing code-required. all:Wllrions to a building ot ,ire before identifying cho.sc spaces, b.Nrc:s, or finishes wrnch an: charaacr-dcfining and mwt therefore be prcscM:d.
Altering. damaging, or destroying characrcr-dclining spaces, fuuun::s, and finishes while making modificarioN to a building or sire ro comply wirh safety codes.
Dcsrroying historic: interior fcarurcs and finishes without careful u:sring and without corui:lcring IC51 invasive abarc:mcnc: methods.
Removing unhealthful building materials with.out regard to personal ;and environmental sakcy.
Making changes to historic: buUdinp without fin:t exploring equivalent health and safety l)'lttnU, methods. or devices dutr m:iy be less damaging to historic spaces, btura:, and finishes.
DamaglRg or obscuring hisroric ,tainnys and elevators or altering :adjacent spaces in the process of doing work to meet code rc:quircmcna.
Covering character-defining wood ftaturtS wich 6rc-n:sistant shcar:hing which raulu in altering their vlSUal appearance.
Using fut:-n:t:1.rdanc coa.tin&J if fflcy damage or obscure: charaercr-dcfining brurcs.
Radially changing, d;amaging. or destroying chanactcr· dcfiningsp;accs, fcarurcs. or finishes when adding a new codc-n:quircd srairw:iy or dcvaror.
Standards for Rehabilitation
& Guidelines for Rehabilitating Historic Buildings
RdMlnJit.tn,.11,ufi,Wt/,aU.mwfJWffJ,{IIIMU,x/"°'" dblr tt cr,nlJMli6k �for" ,,.'"9 dm1,«J1 wpt,ir, ttlur-11ti1m1, 11nd ,w/i1MIU wbil, pmwtJi,'l Ul«t portio,u or fo,· mm whirl, cr,nw, lu biu.ritll! n,/,11r,,L ,, fflk«u,rwl .,,J,,n.
282
Stmduds fur Rehabilitation
I. A propcrry will be used as it was hiuorically or be given :i new use 1ha1 requires minimal change: to its distinctive n,atcrials, fu,uurcs, sp.iccs, and spatial relationship,. 2. 11,c historic character of a pmp1:rcy will be retained and preserved. 11,,c removal of disrinctivt- marcri• all or .1lrcration of bn1rt5, spaa:s, 2nd spa ti� n::brionships that chanaett'LA: a property wil\ be avoided.
3. E:.tch property will be recognt'l.cd :t� a physic;,I record of its rime, place, and use. Changes thar crea.rc a fulsc sense of hisroriClll dc:vdopmcnr, such as adding conjcctur.il features or clements from other historic properties. will not be undcrrakcn.
4. Changes ro .i property rh;i;r h::ivc acquired h�toric �ignifio.ncc in rhcir own righ1 will be retained and preserved.
5. Di.vincrivc materials. fearurcs, tinishcs, and consrruction ttthntquc, or examples of craftsmaruhi.p tht dm-.actcl'nc .a property will be preserved.
6. Dcrcrior:ucd historic fcanircs will be repaired rather than replaced. Where rhc severity of dctcrioration requires repl:i.ccmcnr of a distinctive k::r.turc, du: new feature will m:irch rhc old in design, color, to:ture, :ind. where possible, matt:ri:ils. Rcplaccmcnr or missing li:aturcs will be substantiarcd by documcnrary :ind physic.-:il evidence.
7. Ch.cmial or physicnl rrc.,,rmcna:, if a.ppropri:uc, will be undertaken wing rhc gt:ndcsr mcruu pos.,iblc. T rc:i.rmcnu rhar awe damasc ro hdroric matcri1is will nor be us«!..
ti. Archcological rcsourca will be protected and preserved in place. If such resources mwr be disturbed, mitigation n1cn.n1ru will be undcr�cn.
'.l. New addidons, o:tctior 'UtmtK>n.s, or tdattd new construction wiU not destroy historic matttials, bturcs, and sr-1.tial n:btionships that ch.iractcriu the propcrry. 11ic new work shall be differentiated from the old and will be compatible Wlth the historic materials. features, size, scale and proportion, and m:us• ing ro prorcc:t rhc integrity of rhc propcrry and iu environment.
10. New :ldditions and adr,lccnt Of related new construcrion will be undcrt.tkcn in a such a manner that, if removed in rhc funarc, the essential form and integrity of the historic property and iu environment would be unimpaired.
ltttroduction
ln Rehabilitation, historic building materials and char.ictcr-ddining ftatun:s arc protccrcd and mainr.iincd. as they arc in the t�tmcnr Preservation; how· ever, an assumption U: made prior ro work that c:xl!ting hist()(ic f'-abric has become damaged or dcmiorucd over time and, as a rcsu1r, more repair and replacement will be required. Thw, latitude is given in dtc Standard, fur Reh.abiliration and Guideline, fur Rdubilitarion ro rcplal% r:xrcnsivdy dctcriora1cd.. damaged, or mi.Ising fcarurtS wing either traditional or substitute materials. Of the four nnrmcnu, only Rchabilitarion indudcs a.ri. opportuniry to imkc pos· siblc an efficient contcmpor.iry we through. alrcr� arions and additions.
lckntify, R.ain, ,nd..._..Him>ricMam;.b andl'atura
Like Preservation, guidance fur the trotmcnr luhabititarion begins with recommcndarions to identify the farm and derailing of tho&e an:hitcctUnl m.aterials and bturcs t:hat arc impomnt in dc6ning the building', historic character and whid1 mwr be retained in order ro pn:savc rhar charactcr. Therefore, guidance on ukrJtifjmr., �Wailtfi mu/ pmtrTIUft characttr,ddining futures is alw;ys given fim. The charaacr of a historic building may be defined by the funn and dcailing of exterior materials, such as masonry, wood. and mecal; cxtcrior l'taturcs. such as roofs, porches, and windows; inrerior
materials, such as plastcr and paint; and interior !QturtS, such a.s moldincs and st3irways, room con6gurarion and SJXltial relationships, ;u well as structural and mechanical ,ys�ms.
Prouctand Maiaain Hi,a,ricMamialsand Fcatara
Aff.Cf identifying those materials and features that arc impon:anc and mun be rru.ineid in the process of Rdw,ilitation work, then rot«:tutt ,uul m4i,U,U,rtni dtcm arc addressed.. Protection ccncr.dly involves the lea.st dq:;n:e of \nrcrvmrion and U preparatory to other work. For c:x2,mpk, protcaion indudcs dlC maintenance of hinoric material through treatments such as rust tcmoval, caulking, limited paint removal, and re-application of pron:crivc coaring:s; the cydic:a.1 cle.iining of roof guttcc sysrcms. or irua.llarion of fencing. alarm sysmru and other temporary protca['IC mcuurcs. AJthough a historic building will usually require more cxttn.sivc work, an over.di evaluation of ia physical o:indition should alwo.ys begin :K this k,,cl.
11,pair Him>ric M,t<rial, and fcatura
Next. when the physical o:,ndition of characterdefining marcrials and features warranrs additional work rqwri,rx is rcoommcnded. Rchab.litation guidantt fur the repair of historic materials such as mason� wood. and archiftCfW'I! metals again begins with dtc lean dcgrcc of inrcrvcntion poaiblc sud1 as parching, piecing-in, splicing, consolidating, or odtcrwi.sc reinforcing or upgrading; d1cm acoording ro rccognittd pn:scrvarion methods. Repairing also indU<b the limited replacement in kind--or with
283
On'p',1t1IIJ built tU u','flr-fomily. stmi-drtndd t/1,plcm. � /,0111lf wm- rdJ11bili111ltd for• nnu r« ttl rrt11nl9'trtlllttlls. \Vhilt MHHt ttl1tnt1io11"' n.,,-.,;pujiaml i,unior ft«IHm ,m,1 sp,tm Hlffl u«as,,'1 in atd, Mt, ,l,r oarn·m wm ou11tMIIJ I"'"..,/. Pl,«.,.,- Mulid:. Inc.
c:omp:niblc ,ubnituu: m,uuial-of cxrcn.sivdy detcri· orated or missing pares of features when rhcn: arc survivinG pro1otypcs (for cr.implc, brack«s, dcnrils, steps, plaster. or ponions of slate or rile roolins). Alrhout:h wing the same kind of matctinl is alwa� 1hc: pn:krrcd option, substiNrc ffl:ltcrial is lllcteptablc if the f'ol-m and design as wdl ;u the substitute m:m:rial itsdf convey chc visual appc.irancc of the n:m:1ining puu of the brun: and finlffl.
Replace Deteriorated Historic Materials and Fcani ...
Following rcp.:iir in 1hc hicnnchy, Rehabilitation guid.:lncc i, provided for 1Tp/Mi111�n entire charac1crdcfi.ning fntun: with new marcrial bccatUC the lcvc:I of dctcrior.uion or <bm:1gc of materials precludes rep:iir (for example, an CX1crior cornice; an inn:rio,
scairasc; or a compku:: po1th or storefront). If chc csscnrial foffll and derailing arc still cv,dcnr so rhat me physioal evidence con be used fO n:-aablim me fu.uurc u an inrq;ral Frt of rhc rehabilitation, then its rcpbccmcnt is approprultc. Like rhc guidance for
:a:t: tr::: �������rh�::=�:rfC. rial. &cawc chis approach may not always be w:hnially or economically fc.uiblc, provisions arc made to comidcr the we of a compatible subsriNtc material.
Ir should be no«d mar, while me N,rion� Park Service guiddinci n:commend the replacement of an entire char:icttr-<idining feature that is extensively dctttioratcd, they never recommend rcmov.al and replacement wirh new material of a fc:aNrc tharalthough d:unai;cd or dcterioraccd-could reasonably be n:paircd 2nd mus pn:servod.
Design fw the Rq,la=mt of Missing Hisulric Fanun:s
When an entire inn:rior or exterior feature is missing (for example, an cauana:. or cast iron facade; or a principal ,oairasc), k no longer plays a role in physically defining me historic d,aruo:, of the building unless it an be accurately rtCO'YCrcd in fonn and clcuiling rhrough the proa:u of an:fully documatting the historicaJ appca.ran4X. Although accepting me loss is one possibili')', when: an imponanc an:hitcctural fcarure is missing. ics n:placancnt is always recommended in the Rehabilitation guidelines as dtc first or prd'crn:d, course of aaion. Thw, if adequate historic:al. pictori21. and phyrical documcnrarion odlts so chac the fcarure may be accuratdy reproduced, and if ic is desirable to rc-csablish the fcarure u part of the building', hinoric:al •PP"'"""'• rhc:n dcsigniRG and constructing a new feature based on NCh information is appropriate. However, a stt011d ac:ccpt2blc option for the rcpbccmcnt 6:awrc is a new design that is compatible wirh the remaining characttr-dcnning fcaNra of the historic building. The new design shou\d always take into account the me. ,c:ak, and mMcrial of the historic building itself and, mOSt imponandy, should be cbily dilfcrcnri,tcd ,o that • fah. historical app=ana: is nor created.
Altaauonr/Addicuuu fw the New Use
Some exterior and interior alterations to a historic building arc generally needed to assure its continued
use, but ir is most important d\:lt such alterations do nor rulic:ally change, obscun:, or destroy ma01ctcr· defining spam, materials, fuaturcs. Of finishes. Alterations may indudc providing addirional Frking space on an existing historic building site; anting new enrnnccs or windows on secondary dcvarions; insuting an addirionaJ Roor; imtalling an cnrirdy new mechanical sy.stcm; or crcacing an atrium or light wdl. Altcmion m2y al,o include d,c ..team: removal of buildings or other features of the environment or building ,itc: that an: intrusrtC and mcn:forc dcmaa from the OYCrall historic charxctt.
The consttuction of an cxrcrior addition on a hiitoric buildiRG ll12Y occm to be -,rial for me new use. bur a: is cmphasrzcd in the Rehabilitation guidelines d..r ruch new .ddiriotu should be avoided. if P""i· blc. and auuidcrcd ,nly after it is dctamincd rhar those needs cannot be met by altcrinc secondary. i.e .. non d1araacr-dcfinlClg interior spaces. If, afu:r a cborough CV2lwrion of interior solurions, an cxtcrior addition is still judged to be chc only viabJc a!tcradvc, ir should be designed and corutructod to be dearly di.lhrmtiatcd from the historic building and so mar the dlaracttr-dcfining fauura arc not nadKally changed, obscured, d� or dcsrroyod.
Additiom and alterations to historic buildin1;1 arc n:f. cn:nccd wifflin spcci6c scaions of the Rd.abiliation guidelines ,um as Si1e, Roofs. Struau..J Sym:nu, �. bur arc addressed in derail in N,,uAdditUms to Hiltorir Buildin,.s. found ac the end of dtis chapter.
284
Energy Efficiency/Atxcssibility Con,idcnrions/Hc:alth and Safety Co<k Considerations
·n11..'\!: .\C'Crinn.. nr the .. t\liJ.an!).' :k}JR.')� \\'Ork Jon,.: to m«t ;M."l."CS:Sihiliry n-quim111:nL\ ;anJ I\C,ahh anJ Afcry u-.;h,: tL-qu\l\.•u,cnu: or n:tmfirrinS":, m..".L�um m im('ff'l"K' Cl'll..'f'G)' dfo:icnq� Ahhnugh this \,,,d( i.< quite oru:n an impnmnt .Upn.'t nfllcNbilita�n rn,jcl:u. it � us�lr not a p:an nf the owmt ('Ct'Cl:SS nf pn'IIL'Cting Or tq'ilinng; cll3r.K[Ct-dcfinin,; fuatur\!5; r.athL-r, ,;uch wnrk is :lUCSSl.-d for iu potcnti.tl nq;arit,:, imp.&&:t nn d� buUdins's hutnric d1at.1C1Cr, t:.--r thU n:�nn. pnniL-ubt ,:an: must he rJkcn nnt tn �ic-.dl)' c:hana,:, nhscure, d.an,�c, nr ckltmy 1.·h11rJCtcr.Jdin• ing, ntatt:'niW or fc.atu� in the J'"XN ni n�ing; 1.-ndc 11nd ctlL-rg)' n-quin.'fflL't'UI,
&habilitAtion as• TrMhnt11t W'-itn rtp1tir a,,d rrpl11rtmtnt of druriom"d fraturrs a" nrrnsary; wlm, alt.trations or 11dtlitions to the proptrty tUr
plam,.td far" ntw or ,·011ti11utd ust: 1t1td wl,m i11 Npi'ction at a r,trtieular timt is not appropriA.zc, RrhtibililAlion ma1 bf «J1t1idtmi IU • trtt11mt11t, PrWr ID 11nd�r11tkint ttJOrk, n d«tuMntlltion pbm for R,"'1bililAriD11 s/x,uU b, d,u,i,,prd.
BuildingEmrior
ldnuifyut:, rrlAUIUrt, mu/ prtUr11Uff masonry fo.Nrcs that arc imponanr in defining the overall historic character or rhe building such as walls, bcackca, railing,:, cornices, window ai:chimvcs, door pediments, steps, and columns; and dctail.s such as tooling and bonding patterns, coaring.s, and color.
Protmint t111d mllUwui,D,r masonry by providing proptr drainage so that water docs not stand on Rar, horizontil surfaces or accumulate in OJrvcd dccorarivc kaNrcs.
Ocaning masonry only when ncccs.ury to halt deteriora.tion or rtmOYC hcn-y soiliug.
Carrying our muonry surfiu:c deaning tests after ir has been determined that ruch cleaning is appmpriare. Tests should be observed. ovet a sufficient period or rime .so that both the immediate and the lone ra.ngc effm:s an: known to cnabk selection or the gcnrlcst method possible.
0
Rehabilitation
Not R«onm1tndul
Removing or radially changing masonry feaNn:s which arc important in defining me overall histori,e dmacrcr or me building so that. as a result. the: dwaacr is dimini.shcd.
Replacing or rebuilding a major portion or exterior masonry walls that could be rcpaircdx» that, as a ICNlt, the buildUlg is no longtr hlStotU: and lS csscnrially new construction.
Applying paint or other coatings such as stucco to nusonry that has bctn historiolly unpainted or uncoated to create a new appearance.
Removing ptUlt ftom hinoricaHy painted masonry.
R:idiolly changing the type of paint or coating or its color.
Failing to evaluate and treat rh� variow ca.uses of mortar joint deterioration ruch as lo.king roofs or gutters, diffcrcnrial sctdcmcnt or the building, capillary action. or ottemc wwhcr oxporurc.
Ocaning masonry nuf.accs when they an: not heavily .soiled ro a-care a new appa.ranct, thus needlessly introducing chc:mials or moisture into historic materials.
Ocani.ng masonry surfaces without f'CSting or without sufficient rime fur the resting results to be or value.
285
Rch:ibilitation
/u(f)mmmdtd
Ocaning masonry surf.tees with the gcmltst method possible, such M low pres.sun: water :md dcrcrgcnu, wins; narurnl bristle bnishcs.
Inspecting p:1.inftd maronry surfaces to determine whether tcpiin1ing U: necessary.
Removing damaged or dacrior,.tcd p:1inr only to the: next ii;ound l:1.ycr wing the gentlest method possible (e.g., handscraping) prior to tcp;.inting.
App�ing rompatibk p:i,inr co:iting sy,ttms following proper .rurfucc ptcp:1.ration.
Rcpa.inting wi,h colors that :1.n: historically appropri:irc to the building and dlStricr.
F.valu:i.ring rhc ovcn1II condition of du: masonry to determine whether more rh:an protection and maintenance arc required., !'Mt is. ir repair, tn masonry k.arurci: will be necessary.
&parm,, masonry walls and other masonry features by n:poin1ins the mortar joints when: then: L1 evidence of dcrcrior.&tion such as disintegrating mortar, cr.i.c:ks in mortar joints. loose bricks, damp �Is. or c:bmagcd pb.sttrwo,k.
Removing dc:tcrior.ltcd mort:u by carcfi1lly hand-r.1king the joiner; to avoid d:1maging the masonry.
NorR.«omnzmdtd
Sandblasting brick or stone surracu wing dry or wcr grir or other abra.1ivcs. These methods or deaning pcnnancndy erode rhe surhcc or rhe material and accclcratt dcttrioruion.
Using a cla.ning method diat involYCS wattr ot liquid chemical solutions when there is any possibility oHrccz.ing ttmpc:r· aturcs.
deaning with chemical producu that Wl\1 damage masoruy. sud, as wing acid on limesronc Ot marble, or leaving chemicals on masonry surf.ccs.
Applyinc high pressure watct cleaning methods chat will damage historic masonry and the mortar joina.
Removing paint tlm L1 tirmly adhering ro, and thw prorccring, m:uonry surf.i.c�.
Using methods or removing paint which an: destructive to m.'U'onry. such :as sandblasting. application or causric solutions, or high prtssutt w:ucrbla,ring.
Failing ro fullow manufucturcn' product and application insrrucrions when n:painting masonry.
Using new paim colon rhat arc inappropriatt ro rhc historic building and d'5tr1Cr.
Failing ro undertake adcquatt measures t0 assure the protccrion or masonry features.
Removing nondctcriorattd morrar from sound joints, 1bcn repainting the entire building tO achieve a unifurm :irpcaranec.
Using electric saws and hammers tathcr d1an hand tools to remove dctcrior;ifCd mortar from joints priot to ttpointing.
0
Duplicating old mortar in sutngth, com�irion, color, and ttXturc.
Ouptioring old momr joints in width and in joint profile.
Repairing ,tucco by removing the damaged material and p:itching wirh new stucco rhar dupliatcs r:hc old in strength, compasirion, color, and ttXtun:.
Using mud plutcr as a surhcc roaring over unfin.-d, unsr.abilittd adobe because rhc mud plaster will bood to the adobe.
Curring damaged concrc:rc b-.i.dc. to rcmOYC the source or deterioration (often corrosion on metal n:infurc:cmcnt bars). The new patth must be applied catefully so it will bond satisfaaon1y 'Mth, and match, the historic concrete.
Repairing masonry features by patching. piecing-in, or consolidating the masonry wing n:cognaed prcscrn.tion methods. Rcpait may also indudc the limited rcplx:rmcnt in kind-or widt compatible sulmitute matcriaJ..-..or those o:tcruivcly deteriorated or missing parts or masonry features when rhcrc arc .rurviving prototypes sud, u tcm-cotta brackets ot none balusters.
Rehabilitation
Not RltommtNkd
Repainting with mortar or high pordand cement content (unlcu it is the content or the historic mortar). This can ofTcn create a bond that LS stronger than rhc historic material and CU\ cawc damage as a result of the difrtring coefficient of expansion and the differing porosity of 1hc material and the mortar.
kq,oinring with a synthetic caulking compound.
Using a ·scrub" coating technique to repaint instead of tradi-1ional tcpointing methods.
Ganging rhc widm ot joint p�lc when rq,ointing.
Removing sound ,rucco; or repairing with new stucco that is stronger than the historic material or docs nor convey chc same ..-uuat appcarana:.
Applying cement stucco to unfired, unsrabiliud adobe. Because rhc cement stucco will nor bond propc:rly, moistun: can become cnm.ppcd bcrM:cn materials, n:sulring in acc:dctatcd dcteriorarion of the adobe.
Parching concrete wid\Our removing rhc wurcc of deterioration.
Replacing an entire masonry feature such as a com ice or balwtradc when repair of che masonry and limited rcplaccmcnr of deteriorated or musin£ parts arc appropriatt.
Using a substitute material for r:hc rcpbccmcnt part that dOCJ not convey the visu:i.l appearance of me surviving p� or rhc masonry brute or that is physically or c:hcmially incompatible.
0 286
Rehabilitation
R«onmundtd
Applying new or non-historic surface treatments such as witcr-rq,c:llcnt coatings ro masonry only afttt re pointing and only if masonry rcp:iin; have &ilcd to arrest Wolter penetration problems.
Rtpbrciugin kind an cntin: masonry fuarurt that is too dctcrinr,1.rcd ro rcp-.iir-if the ovcr.111.fotm and dct2ilins arc srill evident-using the physi('";II cvtdcncc as a model ro a:producc the fe-,uun:. Examples an include large .sections of a wall, a oomicc, balustr:idc, column, or nairw.1y. If wing the s:imc kind of mare rial is not rcchnic.Uly or economically feasible. then a compatible suhmnnc material may be considcn:d.
Not N«ommmdd
Applying waterproof. wam rcpc:llan, or non-historic coa1ings such as stucco to masonry u a subsrirutc for rcpoint· ing and masonry repairs. Coatings arc &cqucndy unncc.osary, c:xpcnsivc, ;,.nd may change the appearance ofhi$toric nu.sanry as W"CU as accd,ntt its dncrioration.
Removing a masonry foan1rc that is unrepairable and not replacing ir; or replacing it with a new ft:uun:: rhat docs not convey rhc same visll31 appearance.
7111 follawint. worl: is h,,J,litlstrd "' inJit111c 1M1 ii rrprt1mts "11 pttrtindttrlJ N1111pkx uclmic11I or dnip ,uptct1 of Rdlabilitation projt<IS nnd,J,ould 011'1 b� mnsidnrd ll}ia 1ht prrur111rtio11 eon«ru1 Wud ,1bo11t haut bttn mklmud.
&.'111UIIH1/d<,/
ocs;p fur the Rcplacanent oFMissin; Hisloric fcahlra
lksittning ;anJ installing" l'IC'\'I m,llnnry Jcitun: such ii.\ steps or i& Joor p:Jimcnt whrn rhe hi,;mric fu;arun: is 1."0mplctcly mb.,ing. It M1l)' be 11.n ;11.'l.itr.ue n:i:tor-.ltinl_l, using his.tnri1...&1, pklmial, anJ ph)'fl..:.al dt'lt..'UML'fltariuno °' � ll n..-w Jaign th;at is i,;ompatihlc with rhc sW:. �-:de, n111tC'IUI, unJ 1..'fflnr of the hinoric b\1ilJinc,
Cn..·,ning ;a lalsc hiuori1.'i1.I :JP('C.ll'.lntc: ht.,;awi: the rcpl.i1.."\.-J nwanry fi."atun: is based nn iruufficicnt hUtori,.tl, pll"tnriJl, and fdi)'sk-.11 dnc.,.uncntation.
ln1mJucing a n,.-w m,1sonl)" rc.irun: rh.it i, ini:nn,p.uiblc in .\izc, )CJ.le, mar1.·rW .and color.
RchabrliQtton
Building Emrior - Clapboard, -thctboa,d, diingla, and othc, - ndiAg and c1ca,....., danmu
Rttomn,mdld
JJ,.itifriur, ,..,;,.;,,t, ,md P"""""'l wood bture, that an: important in defining the OYCrall hi.storic duramr of d,c: building such a5 siding, comica, brackcu, window archim.VC!I, and doorway pcdimrna; and their paina:, fintsha, and colors.
l'rot«Wit ,uul mm"11tlW1i11t wood fcarun:s by providing proper drainage so that water U not allowed to and on flat. horizontal surf.lees or attUmulare in decorative fcarures.
Applying chemical prnc:rv.uivcs ro wood features such as beam ends or ourricccn: that arc exposed co decay haurds and arc ttadirionally unpainted.
Retaining coatings suc:h as paint that hc:lp protect the wood from moisture and uln-aviolet light. &int removal should be c:onsidcttd only where that is paint surface dctaioratMK\ and as part of an overall mainrc:nanc:t program which inYOlvcs repainting or applying other appropriate protective coatings.
Nol &rommnukd
Ile moving or radially changing wood brust:S which arc: important in defining the: ovcr.>.11 hi.storic dur.u:ter of d,c: building so thar, as a st:Suit, the c:har:actcr is diminished.
Removing a major portion rl the historic wood from a facade instead of repairing or replacing only the deteriorated wood, d,c:n rcconsm1aing the: &ode with nc:w m:attrW in order tn 3Chic:vc a uniform or "improvtd" appc.u-ancr.
Radically changing the t)1X of 6nish or its color or acc:cnr scheme: so that the hisroric: character of the exterior U diminuhcd.
Srripping historically painted su� to bate wood, then applying dear finishes or stains in curler to cratc a "narunl look."
Stripping paint or wmLSh ro bare wood rather than repairing or rcapp7ing a special 6ni.sh, i.e., a grained fin uh ro an exterior wood fcarure sud, as a front door.
Failing ro idcnrify, cvaluarc, and treat the causes of wood dcu:riowion, including faulty fbshing. bking gutttl'l, aacks and holes in siding, deteriorated caulking in joints and sci.ms, plant material growing t00 dose ro wood surfaca:, or insect or fungus inf-cst:ation.
Using chemical prcscrvarivcs such as creosote which, unless d\Cf were used historically, can change dk: appcarancr of wood feature,.
Srripping paint or other coatings ro rcvc-.a1 bare wood, rhus exposing hi.storically coated surf.aces to the cfn::m of accdcrattd weathering.
287
Rehabilitation
&ro11m1tndtd
lns�ring pain<Cd wood sucfica: to determine whether rcp;iinting is nectuary or if de.mini; is all 1har is required.
Removing dam:igcd or dctcrior:m:d paint ro the next JOund ''l"' wing me i;cndcsr method pos,ibk {handscraping and han�nding), then rcpainring.
Using with care dcetric hot-air guns on decorative wood fcaNrt:S and dccuk �t plua on flat wood surf.aces when �nr is so dcrcrior:ncd that total removal is necessary prio, to rcpainring.
Nor H«ommrodtd
Rc.mOYing paim rhat is hnnly adhering ro, and thus. pro«a· ing wood surfua:s.
thing destructive paint removal methods such as propane or butane torches, gndl,lasting ot warabl:uring. Thc:sc methods an irreversibly d:am:igc histo,ic woodwork.
Using rhcrrmJ dcvia:s improperly JO that the hLStoric woodwork is scorched.
Amrtrlillf It t/,111 SltulM,rl, for RdJt1bill1tt1i11n, txidiltt hiJMir lnA/trutls UJtlttld bt pro1«tttl, mtti111t1intrl ,,,,,1 rr}lfiml. /11 ,,,, cm,1"4,y l"frr'- UN 111iHt'6U11 nnd Jm11m ,{ 1/,u historic midr11tt ,urrr m1rfi1U, prnwml.
Using chemical strippers primarily to Npplcmcnr other methods such as handscraping. handsanding and me aboverecommended thermal devices. Detachable wooden dcmcnu 1uch as shurtcn, doors. and columns may-wich the p<opcr ..fq;uanb--bc chemically dip-nrippcd.
Applying wmpa.tibk: paint ma(ing sys rems foHowing proper surf.aa: preparation.
Rc.painring with colors that arc appropriate to the hi.scoric building and distria.
Evaluating the ovcraU condition of the wood to determine whether morc than protcaion and maimcnana: art required. that is. if repairs to wood fcarurcs will be ncc:cnary.
hpniri111wood fcarun:s by patching, piecing-in, consolLdatins, orodtcrwi.sc n:inforcing me wood using m:ogruttd prcscrvarion methods. Repair may also include chc limited rcplaccmcnr in kind-or with compatible subsriNce. marcrial-of those cxa:nsivdy dcterioraccd or missing para of fca. rurcs where there an: surviving, protocypcs such as bradccu, moJding, or sections of siding.
R,pl,uiui in kind an cnrin: wood fcaNrC rhar U: coo dctctiorarcd to rcpai�if the ovcraJI furm and dcailing an: nill evident-using me phy.sial cvidcn« as a model to rq,rodu« rhc bni«. Examples of wood katura indudc a o,mic:c, cnrablaNrC or balwm.dc. lf wing the same kind of material U: nor technically or economically kaiiblc. then a compatible subnirutc material may be considc:red.
Failing to ncum.lizc the wood thoroughly after I.Wng chcmia&ls so that new paint docs nor adlmc.
Alk,w;ng dcadublc wood li:an= ro soak roo long in a au,. tic solution so that the wood grain U: raiJcd and the swf.tcc roughened.
Failing to follow manufaaurtff' product and appliarion innrucrioru when n:painring cxraior woodwork..
Using new colors rhat arc inappropriarc ro rhc historic buildingot di.strict.
Failing ro undcrakc adcquarc measures to assure the protterion of wood fcarun:s.
Replacing an entire wood fcarurc nich as a c:omia: or wall when repair of me wood and limiral rq,laa:mcnr of dcrcriorarcd or missing pam uc appropriarc.
Using subuitu.tt: mattrial fur chc replacement 5>2rt that dcxs nor convey the visual appearance of the sumvi0£ pam of d1c wood fa.Nrc or that is physically or chemically incompatible.
Removing an au\f'c wood bMt: rhar is unrq,ainablc and nor rcpb.cing ic; or replacing ir with a new fcaNrc rhar docs nor convey the same visual appcara.n«.
288
Rchabilitadon
11u follbwi"f, work is hitf,tipsed to indit1tft th11t it 1rprt1tnt1 tht fN'l'tin,IArly rompltx ttrhnitnl or dnign mptt11 efRchabilitation proj«n nnd Jhou/d only bt ronsidtrrd nfttr tht prrmwrtion ronttrns listed ,,bout hn111 bttn 11ddrmtd.
&-v,,,,,1&·Jttkr/
Daip fo, lhc �tor Missing Historic fed,...
Dcsi�ing ianJ instilling II nc.'\v ,w,nJ (i:.&turc )uch ias ll cnrnia: nr dnonv.1)' when chc hisrori1,; (r::1run: is mmplcftly missing. tr ma)· be lln axuma: Mitoration,Wflg hiuorial, picmri.d, o.nJ physi(al Jncum,:nminn; nr be a ,-,-w design th4t iJ i:omr,atil1lc with chi: siu-, ic.ili:, mati!rial, .and cnlnr of dlt' his, coric buaJtng.
Not &rr,1111nn,d,·,I
Creating a (alsc hiunric.J :arp,:aram:r: b«..ausc 1hc n.,,b.. .... .J wnnd �turc is ba:-d on ltUullidcnt historical, ri,anrial, .lnd phy,ic.J Jocumcnminn.
JnnoJucing :a new wood fcJ.run: rh.11 is incomraribk in size. scak:, mati:ri:d 2nd color.
Rchabilit.otion
Building &tmor
Arduta;.tunl Mdab: wt iroo,·smd. prcar.d tin, coppcr1 aluminum, and zioc:
&tommnukd
Jtlnuifri11i, rtlA»1i11i, ..,,J pram,U,.rarchittttural metal fo.tum: such as columns, capitals, window hoods, or staitwayll cha, an: impomnt in defining the OYCrall hi.noric char::actCT of d1e building; and their lanishcs and colon. Identification is :al$0 critical to diffcn:nciate bctw«n mctala prior to work. Each metal �a.1 unique properties and thw rcquil"C$ different ttcatmcnts,
Prot«tu,r ,au/ mtti.,t/lUJIU1g architectural mcr::als from corrosion by providing proper dr::ainagc so that water docs not .scand on Rat, horizontal surf.i� or accumulate in cul'Vro, dcmn.tivcfc:trures.
Ocaning architecrural metals, when appropriare, to rcmOYc corrosion prior to rcpainring 01 applying other appropN.rc pJ'OfCC:rivc: coa1"1gs.
ldcnrifying the particular type of metal prior ro any cbning proccdute and then tcSting ro 15Slln: that the gcndcst deaning method possible is $Clcctcd or determining thar deaning is inappropriate for the p-2rricular metal.
Nor H«ot1,mtndtd
Removing or radically d1:mging architectural metal features whidt arc impomnr in defining d,e ovcr::all his-toric char:a.crcr nf the building so rhac, a.1 a ttsult. fflC character LS dimin· ishcd,
Removing a major portion of tl1e historic archirecrural mctlll from a. bade inucad or repairing or replacing only rhc Cktt# rioratt"d metal, then rcconstrucring the fxadc widt new material in order to create a uniform, or "improved" appcar-21\CC.
Radically dunging chc type of fin Uh or its hiJtoric color or accent tthcmc.
F-.1iJing 10 identify, evaluate, and treat the causes of corrosion, such a.s moisture from !taking roof, or gutters.
Placi"I: incomP"ciblc mculs cogcthcr wirhouc pm,;,jing • reliable l�ararion material. Sud\ incomparibility can rcsulr in galvanic corrosion of rhc lcu noble metal, e.g .• copper will corrode can iron, s-tccl. rin, and aluminum.
Exposing mct:ils which were intended to be protected from the environment.
Applying paint or 01hcr roarings to metals such as copper. brontt, or itainlcs.s ncd that were meant to be o:pruc:d.
Using ckaning methods which alccr or damage the hOO,ric color, ttxtute, and finish of the mcul: 01 dQning when it is inappropriate for the metal.
Removing the parina ofhlStO!K metal. 11,c patina may be a pron::crivc coating on 5omc metals, such :\..� bronu: or copper, as well as a significant historic finish.
289
Rehabilitation
Rtroumrendtd
Oc;ining soft metals such as bd, tin. copper, rcrncplatc • .ind zinc with appropri;acc du:mieal mc:thocb because their finiihcs can be easily •bradcd by bl:isring methods. Uslni; rhc: gcnrlc:sr dc:anins mcdux:lt for ax iron, wrousht iron, .ind srcd-hard metals-in order to n:movc: paint buildup .ind corrosion. If handsc:raping and witc brwh.ng have provc:n ineffective, lo\Y prasutc grit blasting m.iy be wtd � long as it docs not ;abr.ldc or damage the ,urfacc.
Applying appropriate paint or O(hcr coacins $)'$terns alter cleaning in order co dcacasc the corrosion r.itc rl mc:Qll Of .11.,,..
Rc:p.ainting widt colors that ;arc ;i.ppropriatc ro the hinoric building or distria.
Applying an appropriate pcot<:etivc coating such as lacquer to an archir:ccru� mc:ral fc:aturc ,uch as a bronu: doo, which is subject to licavy palcsrri;in use. Ewlu.iring the: overall c;ondition of the ;uchm:ct\lral mer.ala: to d(:Camine whether m0«: than pro{CC(ion and maintaiancc arc �quired, rh;at is, if rcpai11 to features will be nCCCQ.1ry, &pt,in'11t archircaural mccal fuaturcs by p;atching, ,pl icing, or orhcrwisc tcinforcin; the: metal following n:cognn.cd pn:scrvarion mcthoch. Repairs may also indudc d,c limited. rcpfaccmenr in kind-or with a compatible substitute matcrid--of thoa:c a:tcnsivdy dctcrionatcd or missing para of fca.. cures when rhctc arc surviving prototypc1 such as porch balwtcrt, column cv.pir.ab or bases; or porch cresting.
Not Rrtommmdtd
Oc-.anin&soft metals Nch as lead. 1in, copper. m-ncplatc, and zinc wirh grit bJuring which will abnadc the surhcc of the meed.
r-.ilini: to employ gender methods prior to abrasively deaning cast iron, wrought iron or steel; or using high pressure grit blasting.
Failing co rc-;apply protective coaring qsrcms to mctab ot a.l"'5 dut �ire them after deaning so due ar.cclcrarcd oor-ro.non occurs.
thing new colon: that arc in;appropri:atc to the hinoric building or di.mice. Failing to mess pedestrian use or new access patterns so th;ar archircaural metal fcuura an: subjca to damage by use or inapproprian: mainrcnancc such as Alting adjacent sidcwallu. Failing to undcmkc adequate mcasura to assure the protection of ;acchKCCNr.lJ metal fcarun::s.
Replacing; an cnrin: archiKCtU.ra.l mc:tll fcarun: such as a column or a balustrade ,'fflCn repair of the metal and limited. n:pla�mcnt of dctcrior.u;a:i or missing paru arc appropri2.n:.
Using; a sub.niruce material fut the rcplaccmmt part rN.c docs nor convey the visu:il appearance of rhc surviving; p;aru of the architcetural mml karun: or that is physically or chcmit:3ily incompatible.
&p/Minz in kind an cnrin: architcauraJ mttal fuarun: that is too deteriorated to repair-if the OYCrall form and detailing o.re still evident-wing the phys� evidence as a modd to reptoducc the f..ru<c. Examples muld indudc an iton porch steps or atd sash windows. If using the wnc kind of material LS not «:chnically or a:onomically feasible, then a compariblC rubstirutc material may be considcl't<l.
Rehabilitation
Not &to1111Pnllkd
Rc:moYing an archirccnn;a.l mew ftarure char is unrepairable and not replacing it. or replacing it with a new archttcaUral metal r..ruo: th2t docs not a,nvcy the ,amc virual appear· •nee.
Tht followiJ1t work u hithJiihml to indktttt dMt it rrprar11ts ,IN p,trtic.Jttr/.y ton,plo ttdmial or Imp ,uptm of Rehabilit.1h0n p,oj«c •udsbould •niJ b,a,,,;J,,,d ,ft,r rb, p,,,,,,.,ri,n tonmn, listtd .i,.., i,.., b,a, �
290
Rehabilitation
Building Exterior
Roo&
ldnrtifjiug. rrtAhring. nud p�m,i11: roo&--and 1hcir functional ;ind dccorarivc brurcs--that arc in1porranr in defining rhc OYCmil historic d,:traacr of the building. This indudcs the roon: shape, sud1 as hipped, gambrcl, and mansard; decorative features such :u: cupolas, cresting chimneys, and weathervanes; and rootinc m:iterial .such as slate, wood. cby rik. und metal. as wdl as its sitt. color. and patterning.
Protttti"g n,,J 111tti11t1aiui11g a roof by deaning the guttc11 :ind downspouts and replacing dctcrior:lted flashing. Roof shc:uhing should ;ii.so be checked for proper venting to prevent mouturc condensation and wirer pcnctr:i.tion: :ind to ensure that marcrials o.rc free from insect infum.rion.
l>roviding adcqu:uc anchorage fur rooflng material to guard against Wllld damage .ind moisnirc penetration.
Jlrorccting a leaking roof wnh plywood and building paper until ir c::m be properly repaired.
Not R«ommtNdtd
Radially changmg, damaging, or destroying roofs which arc imporr.mr in deAning the overall historic characrer of the building so thar, :u: a rcsulr, the d,ar;crer is diminishrd.
Rc:moving a m:ijor portion of the roof or roofing material rhar is repairable. then reconstructing it with new marcnal in order to cn:att: a uniform, or "improv«I• appcarancr.
Changmg the configuration of a roof by adding new fcarures such as dormer windows, vents.. or skylights so that the historic character is diminished.
Stripping the roof of sound historic: material such as sla.rc, cby tile, wood. and architct1Uri1 metal.
Applying paint or other c.oarinp ro rooling material which hllS been historiailly uncoated.
F.1.iling to cle2n and maintain gutters and downspouts prop• crly so rhat W1rcr and debris collecr and owe damage: ta roof fasteners., shorhing, and the underlying srrucrurc.
Allowing roof F.utmers. such as nails and dips to con'Od.e so rhat roofing material is subjecr ro ::i.ccderarcd. dcttriorarion.
Ptrmining a leaking roof tt> remain unprotccttd so chat a.ccclmttd dctcrioni.rion of historic building materials-masonry. wood, plaster, paint and structural membcrs--occurs.
&µiri11t a roof by reinforcing the historic materials which oomprisc roof karurcs. Repairs will also generally indudc the limiw:l replacttncnt in kind--or with compatible substirutc material-of those cxtt:nsivdy deteriorated. or missing parts of brures when there arc surviving prototypes such as cupola louvers, dtntils, dormer roofing: or slates, tiles, or wood shingles on a main roof.
Rq,/AcU,t in kind an entire fcarurc of the roof that is too deteriorated to repair-if the ovcnJI form and derailing arc still cvidcnr--using the physical evidence as a modd to reproduce the feature. Examples can include a large section of rooting, or a dormer or chimney. If wing the same kind of marerial r$ not technical?' or economically feasible, 1hen a compariblc sul»ritutt: mattrial m.i.y be considered.
Rehabilitation
Not Rm,n,mffl/Ud
Replacing an cnrirc rooffcarurc such :u: a cupola or dormer when repair of dte historic marcri.a.ls and limited n:pw:ctncnt of datrionttd or missing pun an: appropriate.
Failing tn n:u.st intact slate or rile when only the rooting substr.1.te nccd.s rcplaa:mcnt
Using a rubstirutc material fur the replacement part rhar docs not convey dte visual appearance of the surviving parts of the roof or rliar is phy,iolly or chemically incompatible.
Removing a feature of rhc roof dut is unrepairable, sud, as a chimney or dormer, and not n:pbcing ir, or replacing ir wirh a new feature that docs not convey the same visual appear· ancc.
291
Rehabilitation
n,, fa/la,vi,,g w,11-k ii higlJith1td 10 indirntt rlmr it rrprtsents tht P"rticu/nrly compkx ttth1tictfl or dnit,n nsptrts of Rehabilitation proj«tt ,md sl,01141 M/y bt (01t1ultrtti ,rfin· tht pmn-lkin·a,, ronrtnu l,irtd nbow h11w IHtN ,uldrnwl.
&co111u1mdtd
O..ip, for ,he llq,laa,Mnt ofMwiag Hdloric Fat ....
lksigning and cnnstruaing ,1 rn..-w fawn: when the hi:sl'Dric f1.\1Nn: Lt rompk"tt:�· miss"'£., JU\.it as cbimllC)· nr cup,lJ. h nuy � 1111 iaa.ur.uc rw:nminn u..:ing his1otial, rittoriw, .ind rlt)•sial JC'k.'\Untnt.uion; nr he: a new Jc,ign d,:at b a.mp.atihk wid, 1l1e sa.&:1 $Cilfo, nt&t1..-ri.il. and cnlnr nf ,he hiuori.: huilding.
Abcn.tiom/Addilion, for the New Use
ln.\t.lllift£ JTA.'\:hanu;;d and service 'ttl'•irmcttt nn the ntat· sud. a.s .air c.:nndirinning, tr.stuliinnL-n, or solar collC'Cffln when n:qniml fnr 1lrc n1.·w WC" sn rb.1r 1h-.1• :tn: incnrupi1.-uo1JS from du: ruhli\: righr-nf-wa,· auJ Jn noc � nr otm.,m: clw· am.T-dcfining fe.11\lR..'\.
Dai1,.-ni11s ;1JJ.iuons rn mol; ,ud, 11.1 m:idcnr�I. office. nr icnrap: �; ck..'Yatnr hnusU\I;', J..-clu .1nd 1�r.-:cs: nt Jnrm. m or dc.yliglus \\�lCn rcquin.,J hy 1hc new use so th;a1 11"-')' ;an: incnnsricum» fmn1 d\C rublic ri;ht·of-w-,1)' and Jn nui d.ama&'-' nr nbs.:un: dw-..,,cr-dctinin; fo.mm.,.
Cn:.ating ;a fabc hlttnrial 2ppcar;w."C h.."C".awi: rlu: n.-pl.actd lc.K\lrc is baU on imuffM:lCnt NKoriaL pictorial, .lnd phySlal Jo..'\lmcn1,nio11.
lnrmdudng � RC\\' mnt' ft-arun: 1lw Le incnm�riblc in si?C, a:ok, mao:rial "'d color.
lnmtling ma:hanictl r,r KfYi1.-c t'\luipmenr .m rNt it J.tnl.l{;l."S or nh.an:s dur,u:,cr.Jcfining fu11run:s: ot is aul'opW\lnus fmtu the public rigfn-of-w:1)'.
11.idi.,.Jly d=i,ini; • durJCtcr.Jcfining nxl sh•p: nr .b""G· ing or Jatt'O)i� .:h:&ractcr-dtfming moling nut\.-ri;al ;u 14 R.'SUlt nf in..-amp,atiblc daign or impmpt."T insr.Jbrinn tC\.il• niqui..""S.
0
Building Emrior
w...i""'
R«onmundui
Jdnllifyiui, ,w/Ai11Ulg, a,ul prTm"uU11Wlndaws--and thcir funcrional and dccora1ivc fcawrcs---di.u an: imponant in defining the ovm.11 historic chanacr of the building. �uch fca.rurcs can indudc. Frames, wh, muntins. gluing, sills. heads, hoodmolds, pandlcd or dccom,d jambs and moldings, and interior and exterior ihunrrs and blU\ds.
Conducting: an indcpc:h survey of me condition of existing windows cariy in rehabilitation planning so rhat repair and upgrading mctl\OCU and possible replacement options cm be fullycxploi<d.
Prot«tu11 ,au/ nuzi1UIIUUl1t the wood and architcaural metab which comprise the: window frame, sash, muntins, and surrouncb through appropriaa: sumo: m::atmcntS such as dtaning, rus1 rcmov.J. limitcd p=,int removal, and rc-appliation of prorcaivc coaring sysmns.
Making window, w,,uhcrtight by n:-caulking and replacing or in.stalling weatherstripping. Thac actions also improve d,cnnal efficiency.
Rehabilitation
Nor/lmm,,.,,./,d
Removing or radically d,.i.nging windows which arc impor· tmt in defining the histor.C character of the building so th,u:, as a rcrult, the characa::r L1 diminuhed.
Olanging the number, location, si'l.c or gluing pam:m of windows, chrough cutting new openings, blodcing-in windows, and inscalling n:placcmcnt sash that do not fit the historic window opening.
O.anging d\C' historic appcar.tncc cl windows d1rough the use of inappropriate da:ign.s, materials, finishes, or colors which noticeably ch:mi;c d,e sash. depth. of reveal, and munrin configuration; the rcffccriviry and color of th.c gluing; or the appearance of me fuunc.
Obscuring hUroric window trim with meal or other material.
Stripping windows of historic mattrial such a.s wood, c:ast iron, and bronze.
R,placing windows solely bcawc of peeling I""''· broken glass, .swck n.sh. and high air infiltration. These conditions, in thcmsclvcs, arc no indiarion that windO'NS arc beyond rcp'4ir.
Failing to provide adcquarc prottttion of m.ircrials on a cydial basU: so tha1 deccrioration nf th.c window raulo.
Rcuohning or replacing windows ra1hcr than main12ining the sash, frame. and gw.ing.
n V
292
R<habilitation
H«o111111t11tkd
Eduaring the over.JI condition of marcriah to dcttrminc whether more trul.n protection and main(Cnancc arc required, i.e. i� rcpaUI ro windows and window features will be rc:qu1rcd.
Rtpitiriuiwindow rr.1.mcs and mh by pMching, splicing, consolidating or od1envisc reinforcing. Such rcpoir may also include rcplaa:mcnt in kind-or with compatible substinnc macc:rW-of tho.sc p:aru that an: either o.rcNM:fy dcn:ri• 0r.1tcd or inc miJSing when thctc arc surviving prototypes such as architraves, hoodmolds, sash, sUls, :md inmior or cxrcrior shuttffl and blinds.
Rq,Wint in kind an cntirc window that is too dcreriorared t0 rcpatl wing die same sash and pane: configurat&On and omc, design dmib. lf using rhc same kind of material is not tech· ni=lly or cconomiaUy feasible when replacing windows dctcriorarcd beyond repair, then a compariblc sub.cicure matcrbl may be coruidm:d.
Nor &tommnulfti
failing to undcmkc adequate mc;u;ura: to wurc chc prottt· rion ofhlStoric windows.
N.q,l.1Cing ;,,n cntin: window wl\en rcp:iir of materials and limited rcpl;Ktmcnt of dctttiorarcd or mWing para an: appropriate.
Failing to reuse scrviccm>le window hardware rud1 u bmu ..,I, lifu ond ..,I, locks.
Using �ubsticutc man:rW for the replacement put that docs not comcy me visual appcarantc of the surviving paru of the window or that is physically or chemially incompatible.
Removing a character-defining window thar is unrepairable and bwdc.ing it in; or replacing it with a new window du.t docs not convey the same VUuaJ �pc.irantt.
R<habilitation
Tbt foll°'ui"t w,r/t is hi,l1hjhud to i11dk4u dllft it rrpmr11a tl>t f"lrliculttrlJ n1111p/c.· ttd1uim/ or dait11 ,up«n of Rehabilitation Jl'fj«t, 11nd J,ou/d 01J1 br t011tidrrrd ttfitr 1W prmrllllrion conttmJ lmtd 11bollt /)ll11t bm, tt"'1rrsrrl
293
Rehabilitation
(If) A11 flrNtorycom,trx MMU rrht,l,i/it111M for tT"1dlh.,uint- (I,) This llitw r1/dH ft'Ar,/n,,,1i,11JJ11MJSdHJN'iml. ni11�n, WtO«iw/J lllind,w, ,md lnr,l1Jilb lbMl OMnlamu.J UN b,,;1,/;,,,. (d Afor iHIIJil'Olrin,, /Wkl/,ilit111ion •'*- tlx 1'1111r TfYlrNl/tflion U JHtWn with -J#t!m ,./d,,/ lo 1h, n,ef. p,,f,/,,m,1,,/ "'""' fi/J;nx dw fem," bri& nmu, ,n,J 11n11 woo,/ d«lts a,J Jri11tt9fmca. B«lf111t d,t worl: rbdllf!d th, /n,i,,ri, J_,,,,. th, p"1jm J;,/ n« ,_ dw S,,,Nl,mh.
R«o111111t11tkd
/Jnui/Ji11t, rrtAi11i,1� o,ul pl'Off'lliHf entrances and porchaand rhcir functional and decorative li:arurcs--char arc important in dcfinins chc ovcraJI hlStOric chan.acr of rhc building ,uch as doon. nnlighc,, siddigha, pilamr. cnnblarun:s, columns, balustrades. and stairs.
Prot«ti1'f m"' tnlU1UIU11i11t the masonry. wood. and archin:crura mew, char o,mpri>: cnrnnca and po«ha mrough appropriate Alr&c:c rrcanncncs ruch u deaning. nast removal, limited paint tfflloval, and nxapplicarion of proo:crivc coaring
systems.
Evaluaring rhc OYCrall condition of materials to dctcnninc wh.cth.cr more dun protcaion and maintcnano: arc required, that is, repairs ro cnuancc and porch fcuurcr will be nca:ssary.
&pdirb,, crn:ranccs and porches by reinforcing the hi.sroric m:ttcrials. Repair will also generally indudc the: limin:d rcplaccmcm in kind-.-or with comp.ariblc subsritun: marawo( those arensiYdy dcttriom«I or missing pu11 of repeated fcarurcs when:: then: an: surviv;ng prorocypcs nich as l»lwtradcs, comiccs, cnc-abl:uurcs, columns, sidelights, and sairs.
Rehabilitation
Not &commtndtd
Removing or raddlly di.inging entrances and porcho which an: important in defining the overall historic dwactcr of d1c building so rhar, as a n:sult, dlC dwaacr ia; diminiahcd.
Stripping cnttanc:cs and porches of historic m:r.cainl such as wood, can iron, tcm cotta rile. and brick.
Rcffl(Mng an aurancc Of porch because me building }w been rc-oricnn:d to aa:ommodatt a new UIC,
Cutting new entrances on a primary dcvarion.
Altering urilltarian or sc-rvK:C' cntranca � rhcy Appal m be ronnal cnrru,m by adding pancllod doors, nnligha, and liddigha.
nUini: ro provid<: adequate ptoo:ction ro marcri;,ls on, cyclical basis 10 mat deterioration of Cntrana:s and po«ha rcsuJa.
Failing to undcrakc adcquatc measures to assure rhc protcerion ofhiiroric entrances and porchcr.
Replacing an entire cnmna: or porch when the repair of materials and limited replacement of para arc appropriarc.
Using. suhstitun: mataial r.. me rq,l=mcnt para rhar doa: not convey rhc y.swJ appcar:tno: of me surviving parts of the cnmno: and porch or rhat is physically or chemically incompariblc.
294
Rehabilitation
/11 R.th,,bili1111i.,,. dttn'iomu,I fo,111m PJOl,kl � tt1'firr,/, wl,n,n,rr ,-il,/1, nnd rrp/Aml wbn, t/,r Jnim'J of UN tlttnwttt mtfffl ii Hmanry. flm, 111,uo..11117 JN1rd1 U trm 1rior lo ll'rrllnHWI (left). TIN jl-, Mini, drr r,ll«l oHJ 1111" d,r t«ll11"u aw i• 11 JlllU 11/�. 1111po,1ttl 01tlJ OJ cnult, 1tmJIM1'7 MJltfa. 01/1a c.mpo,,11,11 ,r,r ;,, wn,ini lldf!' ,f tltr9 Alfl'P>ri-U � 1111 UN bis,r,ri(' ,ordt (rit/1,) ilKIIJtrl rt)Hlin u dJf' porr/1 Mill; 111«/ 1o111/ rrpfmrmtul o/UN r..·11,uiudJ «�«iomtrrl tr1l111mu ,uul fo,or WNIMI. s.n,, rlism,mdi,tt of d,r jNlttl, 111tt1 'l«t#lfry,
&romm�nd«J
&pl,,chit in kind an cnrirc entrance or porch that is C'OG dctc-riontcd to repair-if the form and detailing arc: stiJI cvi· dent-using the physical evidence as a m()f:lcl ro reproduce the brurc. If using d,c same kind of macmal is no< t«:hnic;illy ot ca,nomially fwiblc, chcn a a>mptribk: sllbsritutc material may be considcr;'Cd.
Rehabilitation
Not Rtt:o111111mdttl
Rcmovin& an �trance or porch di.at is untqN!nblc and not replacing it; or replacing it wirh a new entrance or porch dlllt docs not convey d1c same visual appearance.
Thi followint, wo'* i, hifhlitl,ttd to iOIUOltt tlNtt ir rrprtM11ts rlN p,,rtia,ktrly aJ1uple;c 1td,uictd. or dmp ,rsptcu ef Rchabilirarion proj«ts lfnd sho11Jd onlJ bt consiJrml ".fin'• Jlrt#rlltftion amcmu luttd ,r/,ow httw bm, ntldrasM.
295
Rehabilitation
Building Exterior Storcfronb
&commnukd
ldcnrifying, retaining, and prc::scrving norcftontl--ilnd their funcri.o� and dccor.ui.vc fntun:s---that arc important in defining the overall Mstoric character of the bu�ding such as displ>y windows, signs, doon, 1r.msoms. lcick pbtts. corner posu. and cn�brun:s. 1nc rcmo't'al ofin:ippropriarc, nonhtscoric cladding, lmc mansard roofs, and orhcr later aln:rarions can help reveal the hU:toric character of a storefront.
� MIii 1HIU11MJ'11n1Jrrmonry, wood. and arch\wcrural mcto.b which comprise storcfrontS through appropri:uc trcarmcna such as doutlne,. NR remcmal. limia:d paint removal, and IQflllliarion of pn,cmnc cmaag .,.....,.
Prorc:aing aon:fronu against anon and wancblism bcforc work begins by bo..ding up window, and insalllng al.rm systems duu arc kc,td into loc:sa1 pnm:ction ap:nOCS.
Evaluaring rhc existing condition of scorcfiont tnatcriab to dcmminc whcthct more than protcaion :md m1.internlncc arc required, dut ts, if repairs to katun:s ,di be ncccss:uy.
Not Raommt,llkd
Removing or radically changing storcfront5--4.nd their bturo--which m important in dclining: the OYCrall hisn,ric characrcr of the building so that, as a n:sulr, the ch:m.cn:r is dimirushcd.
Oumging rhc ston:6-onr so dm ir appears residential rather than c:ommtte.al in chatKtcr.
Removing hismrie material fiom die storefront to cn:arc a recessed araadc.
Introducing toac:h bnrcrru, mansard dcsigru, wood shakes. nonopcrablc shunm, and small-paned windows if they cannot be documcaa:d hist<>rialr.
Changing the location of a srorcfront's main entrance.
nillag to proridc ado:quaie protection of maa:rials on • cyclical =is so chat dctcrion.tion of storefront fi:aturcs rcsulu.
Permitting entry into the building duoudi unsecured. or broken windows and doors so 1Nl interior features and finishes arc cbmagcd b y expo.narc to wcamcr or vandaHsm.
Stripping .1coccfrona of hismric material such as wood. cut icon, rem cotta. a.nan. glass. and brick.
Failing to undcrtalcc a:lcquarc mcaswa co amuc: the prcsctvarion of the historic storefront.
(\ \
H«ommmdM
&p.iri111 sc:on:fi-oms by teinforcing d,.e NROric ma«:rials. llcpairs will also pcnlly include mo limia:d roplaa:mon1 in kind-orwiffl compatible subsrirurc matcriab-of those cxa:nsivdy dcteriona:d or mLSSlllg para of scon:frona where there ian: surviving procotypcs ruch u tr.tnsorns, kick plates, pilutffl, or aigns.
JllplAd111 in kind an entire scon:lront rhar is roo deteriorated co �r-if the overall fonn 2nd detaili
ng arc still evident
wins me: physical mdona, as l modd. lf wing mo AfflO material is not tcchnially or cconomicallyJcasiblc, then compatible subscirurc maccrtals may be c::oruidem:I..
Rch•bilitation
Nol Rtt.mmnukd
R.cpbcing an entire .1t0n:ITOnt when� of materials and limirc:d rcpbc:cmmt of iu pans are appropriate.
Using subsrirute material fur the n:plao::mcnt para mat docs not conw:y the same visual appearance as the surviving pam of the storefront or trult lS physically ot daemically incompa<iblc.
Removing a 1cordTOnr thar lS unrcpair@!c and not replacing it; or n:placing it wiffl a nC'!I( norcfront dw docs noc convey me: RmO visu,l appoanna:.
296
Rehabilitation
/11 tlw tmtlllU'ltl,. RriMl,,·Wif,;.,,, MC •Jl'Ulli j,r tr/lMmt l#iuiltf bi,.
:::;;,;::ct,�:,fw;�:u;:,:�·t't:::t� romkuf 1111 1866 limn/Mt l,11iltlint U1t1J ,1,issinr; 11Hd tl1t ,:,w,uul i,,,,l,,.ef,w,1/wl km .. ,.;..i,,d,,m/. (6),w/(<) 8,.,,/ •• Ii,, ffMi"'1,iuty .,/fll�!hit ,tn,/ IIIIKrtl«mt,t111A,i,,H, t/x OUlllffl lOffl' 111,k ,.,,«um1tl., mtt1rr tbtcornicr,m,l,tmefr,,111 lo tl!nrl,U1-ricco� fitt1mti1111. A 111builN1t INrlninL fil,npu,, ,u,p WM 10 folnicttu lht mwintPmJM nlfflllcom,u. 1111t1«rpubk11/Jtmtt1iw ,-11 thU110j«1. AJJ.,.,l:�t/wSb,nd,,,r/J.
Building lnwior
Suuau..J�
ldmufri,,i, ,.,.;,,;,.i, ,wd ,,.,,,.,·," muctural symm,-and individual fuuura- of systrnu-du.t arc llnponant in defining rhc o,ual( hi,a,ric character of rhc building, such u post and beam sysrcms, muses. summer beams, vi;u. c:asr iron c:o(umns.1bo¥c-gndc stone foundation walls. or loadbearing brick or stone walls.
Prwu«ti,,, ,wJ HU1Ullnini11t the nruauf'II l)'StCnl by deaning the roof gutters and doWNpOUa; replacing roof Hashing. kccpini; masonry, wood, and archiccaural metals in a sound condition; and cnsurins dw nrucwral mcmbcn arc free fromlf\leamfcstation.
Ex.a.mining and CYa!uating the physical condition of the ,rrucNral sysccm and its individual karurcs wing non-dcsttuctivc icchniqua such as X-r.ay phcxogr,phy.
Rehabilitation
Not &com,uc111Uli
lwnovins, co,cring. or radic,J(y changing visible karu,cs of structuruf ')'Sl'Cms which arc impom.nt in defining the overall historic character of the building so that, as a result, the charaaa-is diminished.
Purring 1. new use into die building which could cm::doad dw: or.isring struaural sy,tcm; or instill ling equipment or mcchanicaJ sysrcnu which could d:umgc ffle muaurc.
Danolishing a loadbcaring masonry waU that could be aUGmentcd and retained, and replacing it with a new wall (i.e., brick or none), using the historic masonry only m: an cxrcrior "'""'·
Leaving known stn.x:rural problems unac;u:cd such as ddlccrion of beams, cracking and bowing of walls, or racking of muccur:J mcmbcn:.
UriJixing ttcltrnentl or producu that accdcratc me dcu:rioration of structural marcrial such u introducing urn-funnaldehydc foam insulation into frame walls.
t=ailing ro provide propu building mainrcnana: so that detcrionrion of rhc nruaural sya:rcm rcsula, Causes of dctcrior.s.rion indudc subsurface ground movement. vcgcc:arion growin& too dose to foundation walls. improper grading. fungal tot, and poor Ulterior ventilation mu rauha in condauarion.
U1ilizing dcsrruaivc probing n:chniqucs that wiU damage or destroy suuaural material.
297
Rehabilitation
&commmdtd
&µiri»t the structu.r.il .sy.srcm by augmcnring or upgrading individUlll p;ru or fcawrcs. For example, wi:alccncd structura] mcmbm such as Door fnming an be paired with a new member, braced. or ot�isc supplemented :ind reinforced.
Jup/,,ti111 in kind-or with substinm: maccrw---chosc portions or fcarurcs of the strucrur:J system that a.re either extensively dcrtrior.m:d ot arc mis:i:ing when there arc surviving prororypa: such u ast iron columns. roof rafu:rs or tnma, or sccrions ofloadbc.lring walls. Substinm: m:;i.ttrial should convey fflc same fonn, design, and overall visu:tl appcanin« as 1hc hisuxic feature; and, at a minimum, be cqu.l 10 i� looclbc,ring capbilitics.
Nor R«om111t1,d«/
\.JpgMin& chc buildingsuucruwly in '1 manner that diminishes the historic character of the cutrior, such as installing stl'llpping channels or removing a dcc:ar.uivc cornice; or cbm-2£CS interior fcanarcs or spaces.
Replacing a nruttural member or other fcarurc of the snucrurol sysrcm when it could be augmented and rcaincd.
Installing;, visible rcplaa:mcnc feature that docs not convey
�':i:c
= �'r:�r:=��-rcp!acing an exposed wood
Using substitute matffW that docs not cquaJ dtc loadbcaring capabilities of the hU:toric m1.tcrial and design or U: othciwisc ph)"ically or chemically incompatible.
t
Rehabilitation
71ll followint worlt is J,if/,litllttd to i,,dic,1tt rhnt tr nplT#111t rl,� jMrtkulttrlJ comp/a ttrh11iml or tksi1.11 n1ptm of Rdiabilitation p,oj«a ,nd should •niJ I,, nmdJnwJ Aft,, 1/,, ,,.,,,..,,;,n '""""" Ji,,,d ,bow i.,., b«tt Ml,Jm,td.
298
Rchabilrtation
Building Interior
Spaca, Fcaturct, and FinLlhc.,
Rtt0n1mtnt:kd
Interior Spaces
ldnui,hiug, rrt11i1iint, 1111d pmn-viug a Roor pl.in or interior spaces thar arc important in defining the ovcnll hinoric character of the building. This indudcs the srt.C, confq;urarion. proportion, and relationship of rooms and t0rridorr. 1hc relationship of futmrcs to spaces; and the spaces themselves such as lobbies, rca:prion ha.lb. entrance halls, double parlors, thcarcrs, :auditoriums, and impomnt ind\unial or C{lmmcrcial !fP;Kts,
Interior Fearures and F'UUJhcs
Identif,illg. n1,t1i11il1g, n11d pn!Sn'lli11gintcrior fui.ruru and finillhcs 1har :in: important in defining the ovc:r.i.11 historic character of the building, induding column.�. cornices, baschoard.s, fireplaces and mantels, p:mclling, lighr fixtures, hardw.u,::, and Roaring; and wallpaper, plaster, paint, and finLShcs such :a stencilling, marbling, -and gnining; and other dccorarivc m:i.terials rim ncccnr interior fcarurcs :i.nd provide color, texture, and p;irterning ro ,v.1.ll11, floors, .\nd ceilings.
Nor Rrrt,,t,n,nukd
R:i.dially changing:,, floor plan or in1triot spacc.f---including individual rooms-which arc important in defining the overall historic char.act'Cr of rhc building so that, as a rcsulr, the character is dimin&Shcd.
Altering the Roor plan by demolishing principal walls and puritioru ro cmitc a new appc-arancc.
Altering or destroying in1trior spaces by irucrring Roors, cutring through floors, lowering ceilings, or adding or removing w:il�.
RclOC3.ring :i.n imcrior feature 11uch as a staircu-c so that the hisroric relationship between features and spaces is altered.
Removing or radially changing fc;KUrcs and finLShcs which arc impo1tant in ddininc the DVffllll historic charKtt.r of rhc building so thar, as 3. result, the character is diminished.
Installing new dccorarivc material th:ar ob.scurcs or damages charactt:r-dcfming interior brurcs or finishes.
Removing pain,, plaster, or other finishes from hisrorically finished surf.aces to create a new appearance (e.g., removing plaster to cxpmc masonry surfaces such as brick w:alb or a chimney piece).
Applying p:i.int, plaster, or other finishes ro surfaces that have bcc:n hisrorically unlinLShcd to aca1t a new apparancc.
Stripping paint to bare wood rather than rcp:i.iring or reapplying grained or marbled finishes to features ntd\ as doors and pandling.
Radically changing the type of finish or irs color, such as painting a previowly vamu:hcd wood fcarurc.
R«omn,mdui
l'rvt«tuJt mul ..... ,.;.;,,, masonry, wood, and archittctun.l metals which comprise inttrior features through appropriarc surface rrcatmcm:s such as deaning, rwr removal, limited paint �moval, and reapplication of prorcctM: coating systems.
Protecting interior fcarurcs and finLShcs �inst arson and w.ndalLSm before projcc:t work begins, cn:aing protlXrivc fencing, boarding-up windows, and installing fire alarm systems that an: keyed ro local protection agencies.
Protecting interior fcarurcs ruch as a st.ircasc, mantd, or dccor1.ti...c finishes and wall coverings: agauut damage during project work by COYCring them wirh heavy 01;nvas or plastic sheers.
0
Rehabilitation
Not &tomn,mlitd
Failint to provide: adcquarc pfe(ccrion to marcrials on a cyclical basis so that deterioration of interior features rcsulu.
Pcnnitting entry into historic buildings through u115COJr«l or broken windows and doors so tNt tht inruior features and finishes arc damaged by opo.rurc to weather ot nndalism.
Stripping interiors of features such as woodwork, doon, windows, light lixwn:s, copper piping, radiators; or ,of decorative matcrills.
Failing ro prov.de proper protection of interior features and �nishcs during ,..,1,. so 1h11 <hey arc goug,:d, ,cratchcd, denied, or otherwise: cb.m:,,gcd.
NOMINAL 2' PLANK CONTINUOUS WALL TO WALL
1' x 1' WOOO STOP SCREWED TO TREAO
112" HOMASOTE BOARD (OR SIMILAR PRODUCT) EXTENDS BEYOND EXISTING NOSING
Hu/Mic fo,tum dwJ d1tmtd1r,, iu11/,IJUUi,,tJ,oult/116,,,,plw prottdNI fo,m dtl� Jurint rrJ.,bili"'l�nwork. Tbrd� int JhiJtUI h,w II raUimJ.. tnN• p,,ntry ll11ir cwrrint ""'' npplurl ow, d,r t!lillint n,11,6/, llllirt1t11. Dmwutt:NttUo,,,,J P�Sn't1Kr11Aff. IMmJ on ..,Jtri,I mxwliJ pwp,r,rd bJ /!mt'] Rot/. 11nJ So,u, P.C
299
Rehabilitation
fnsr.&!ling proctCC'ivc COYcrlr1&5 in arcu ofhc:avy pcdamm tr.lffac ro prorecr bistotic b.rura such as wall cOYCring,:, parquet Rooring and panelling.
N.cmoving damaged ot dctcriontcd p:unu and finishes 10 the nc:xt sound l2ycr wing the gentlest method possible, then repainting or refinishing wing compatible paint or other C0.ltlng systems.
Repainting wich colors thar arc appropriate t0 rhc historic building.
Umiting .abnuivc deaning mcchods ro ccmin indw:nial warehouse buildings whcrc the interior masonry or plaster features do not l,avc disringuishing design, derailing, tooling, or finishes; and whett wood brurcs arc not finished. mold. c:d, bc>dc:d, or wod<c:d by h,md. Abnsivc deaning ,hould only be considcml after other, gender methods have been proven indfu:civc.
Evaluating the existing condition of mate� to determine whcd\Cr more than pro{t'Ction Gnd maintenance arc rcquin:d, that U. il" repairs to interior f'c.lturcs 11nd finishes will be ru:a:s• sary.
&pairiniintcrior brurcs and fini.shcs by rcinforcing the his· toric mamiab. Repair will also gcncl'.llly indudc the limited tcpl;iccmcnt tn kind-or with compatible substiwtc m:m:ri• al--of those o;tcnsivcly dctcrior.ucd or missing parts of rcpc.atcd fo.rurcs: when there ate survMng prototypes �h as sr.ain, balwn�cs. wood panelling. columN: or dccor.:ariYC wall covcrinp or ornamental tin or plaster ceilings.
Nor &tommtndtd
Failing co take new use pan:cnu into con.sidcrarion so dw intaior rcarurcs and finishes al'C damaged.
Using dcstruCCM: methods such as propane or butane corthcs or sandblasting to remove paint or other coarinss. These methods can irrcvcnibly damage the hlscoric matcriab that comprise irKfflOC: fc:atuca.
Using new paint colori that :arc inappropriate to the hlltoric building.
Oiani;ing the taNtc and pac:ina. of character-defining fc:arurcs rhcough sandblasting or use of abrasiYC methods to remove painr, discoloration or plancc. This indudcs both apo,<d wood Gnduding S01KNrai member,) and m.,..ry.
Failing co undcn:00: adcqu;arc measures to w:utc the proccc· rion of Interior fcarun:s and finishes.
Replacing an cnri.rc interior bcurc such as :1 sra.irasc. p;mclkd wall, p:arquct Roor, or comict; or finish such as a dccor:irivc wall covuing or ceiling when repair of materials and limited replacement of such pares :arc appropriate.
Using a substirutc material for the n:placcmcnr pan that docs not convc::y the visual appearance: of the survivin; parts or portions of ,he irucrior fcawn: or linish or ffl:at is physically or chcmially incompatible.
R«ol11111nuld
Rq/4d,,: in kind an c:nrirc int'Cfior fua.(¥tc or finish dt:at is too dcccrior.utd to repair-ff dtc ow:ra.11 fonn and dc:tailing an: aill cvidcnr-usi"ll rhc physial evidence" • modd for rcproduaion. Ex:a.mpli:s could include wainscoting. a tin ceiling, or interior min. Jf using the.same kind of material U not ttthnially or cronomic:ally feasible, then a compatible ,ub,rirurc matorial may be consid=d.
Rehabilitation
Not &co1111un,ded
RcmlMng a cha.raacMidining fawn: or 6ni.d1 that is unrepairable and not rcplacinc; it; or replacing it with a new fc:atun: or finilh that docs not convey dtc same visual a.ppc:u· ana:.
• •
M,,,,l,ili,,ui,,ihilt.N,lwrl/i,,r1111iu -ftn,indutln, .. 1tkwl.•f"-'·,.,,inl1Mom/111Mtnll0fl. W1.lffltllff'�fN1illlkfj,utr1Jl«I. cbip, mfZI", .,.dltl'wiN m,,,o '-" (,(). it UlrJa/,J � l'fflfffrtl ;,, "'""'1t1" dJ1t1 prr,1tm Wt ,,,,,,/ttr,u IIJflJ ,u lbt imndM1, mllirr,11u1n,1. /11 d,U ca11n,lr (I,). dx lkltri•tint wd-}'Unt WtU rrmowd th,,11,J,ou1 ,IN 11p,,rtmm1baildin111#1111 n,,np,,,,il,/, 1ri11wr 11nJfi11hh l"'i"' 111,&J. PIIIMtJJ:SIM""' C Atrlt.AIA.
300
Rehabilitation
'/1Je .followi11t 1110rk U INthli1,htd ,o mdiclfk rh,,r ir rrprtJ1na tl.1t partic1t'1trlJ comp/a rtdmicttl or doip 11JptcJ1 of Rehabilitation
projtcu ,md ,J,011"1011/y bt ro1uidcrttl dfkr Jht prrsuw1Jio11 crmunu UJrtd ttbout lmut bm, ttddrastd.
Rdiabilitation
301
Rehabilitation
Building lntcrio,
Mcd.a.nical S,...._.. Hcadag.Alr Conditioaing. El<Clrical, and Plumbing H.ttrmmttntl«I
lde11ti/Julf, rwf.trinh1x, •11d pn::sn-11i111 vi.siblc fcarura of early mcchanial sysrem, that are important in defining the O\'tt.111 hlS1oric chanaCC'Cf of the building. sud, :u radiaron. vents, F.uu, g,Ulcs, plumbing fixtures, swia:hplatcs, and ligha.
l'ro1«b1111111d UJAi11t11i11i111mcchaniad, plumbing, and clcc.rrical systems and their b.rurcs through crclic:al deaning and orha appropriate measures.
Pn:va,ring accdcr.ncd dcc:crion.rion of mechanical sysrems by providing .dcquan: Y<RtU.tion of .,tia, crawlspx,,s, and cdlm so chat moinurc problems arc avoided.
Improving U\c energy efficiency of o:isring mechanical qs• � ro help rcduc::c the: need for dabonuc new equipment. Consideration should be given to iru:t2lling storm windows, insulating attic crawl space, or adding awnings. ff approprC· alt.
&p4iri,1t �ial .systems by augmenting or upgrading system pam, such as insralling new pipa and ducts; rewiring; or adding new comptcU011 or boilers.
Rep/Ari11t in kind-or with compatible substiNtc material-those visibJc fotrurcs of mechanical JyStcmS that an: either or.«:Nivcly deteriorated Of arc promypcs ruch as exiling fans,, swidiplatcs, radiator,, grilles, ot plumbing fixNn:s.
Nor /Wrmm,md«/
Removing ot ..dially changing k.iturcs of mcch,nial sym:ms that arc important in defining the over.all historic ch.uaetcr of the building $0 that, U$ a rault. the charaacr is diminished.
Failing to provide adequate protection of materials on a cydial Wis m that dcterion.rion of mechanical $f1CCms and their visible fi:aNrcs rcsula.
Enclosing mechanical $)"TI:rN in areas dm an: nor adequately vcnrilucd so chat deterioration of the �renu JUula.
INtalUng unnctaSary air conditioning or climate conuol syatcms which an add cxcasivc moiswrc ro the building. ThLI additional moisNrc can either condense imidc, damaging inreriot $Urf:a.c=, or pus through lf\lffiOt' walls to the cxreriot, potentially damaging adj:lCt'nt materials a.s it migni.ta.
Replacing a mcchanica.l $)'Stem or ia functional puts when it could l,c upg,-,dcd and n:taincd.
IMtaUing a vi.siblc rcplaa:mcnr feature that docs no1 convey the same visual appearance.
Rehabilitation
TIN fo�wint worlt it hi,IJ/i,!,ttd '- i,,dicttrt tht,1 it rrprr:gnn tht Ji"rtieultJrl, camp/a t«/J11knl or daip1 tt1pcrn of Rdlabilitation proj«a mu/ shauld 01", 1H co,uidmd tt/ttr d1t pmn-1111ti,m co11cm11 Ulttd 11bow haw b«1111dtlms«J.
302
Rehabilitation
Building Site
&rormnmdtd
ldmtifji11g, JYlll;,,;,,i, ,md prr:uroi11t buildings and d\Cir bn1rcs M well as fo:m1rcs of die .site th:tt :ire important in defining its nvcr;all historic ch:iractcr. Site foaturcs may indudc circulation S)'$tcms such :u- walks. p-,uhs, ro:ids, or parking; vcge· tarion such a.t trco, shmbs, fields, or hcrb:tccow pl.mt matcr;-,11; landform., such as tcrr.K:ing, bcrrru or gnding; furnishings such :is light11, knees. or benches: dccor.nivt clements sud, as .�culpnin::, sr.atu:try or monuments: w.m::r lt:iturcs induding fountains.. nrc:ims, pock or lakes; :1nd s,1b.surfucc archcologic_:il bturcs which :ire imporr.un in defining rhc hismry of the sire.
Retaining the historic n::haioruhip between buildinp and rhc landsc'll.pc.
l'rot«ti11g 1111d mni11ttti11i11t bnilding.s and the sire by providing pmpc:r dr:i.inai;c to :tSSUrc thar W':lter don not erode fuun· d:irion w;ill.s: drain tow.trd the building; or damage or erode the land.scape.
Minimizing discurb:\ncc of terrain around buildinG5 or elsewhere on the sire. thw tt:ducing the pos.sibility of dcstr(')'lng or d:im:tging important landscape bcun::s or :tn::hcologic:tl n::50llrCCS.
Not R«ommtNUd
Removing or radially changing buildinG5 and their ltarures or .site features which an: impom.nt in defining the ovc�I historK: character of rhe property so that. as :i result, the character is diminished..
Removing or rclocaring buildings or landscape k'atura, thus destroying the historic relations.hip bctwttn buildings and the landscape.
RcfflO'llng or relocating historic buildings on a $itc or in a complo: of related historic srruauro--5uch as a mill com· plo. or fu.rm-<hw diminU:hing rhc htmJ1ie chanctcr of the sire or complo:.
MO"ling buildi� onto the site, thus creating a hlsc historical appcar;ncc.
Radially clu.nging the gridc. lcvd of the site. For cximplc. changing rhe grade adjacent to a building to pcnnit dcvclopmcnt of a formerly bclow-gr:ade :uca that would drastically change rhc historic rclatiomhip of rhc building to its site.
Fa.iling to maintain adequate site dr;ainasc so that butldinp and sit'C features arc damaged or dcttroycd: or altcm:itivcly. changing the .site grading .so that w.1.ter no longer d�in.s properly.
Introducing hc:tvy machinery into areas when: it may di.srurb or danugc impomnt landsa.pc fcatura or an::hcologu:al resources.
Surveying and documenting areas where the terrain will be ali:ercd to determine the potential impact to impom.nt landscape features or arch�ogical resources.
Prorccring, e.g., preserving in place impomnt archcologic:a.l resources.
Planning and carrying out any ncccs.ury investigation wing prokss<>nal archcalogisa and modem archcological methods when procrvarion in place is not feasible.
Prcsc:rving important landscape fua.turcs. including ongoing maintenance ofhinoricplant material.
Protecting the building and landscape katura aga.inst anon and vandalism bcfote rehabilitation work begins, i.e., crccring protmivc fencing and irucalling alarm .sysa:ms that arc keyed into loal pmttcrion agencies.
Pn:rviding continued protcetion of historic building materials and planr btura through appropriate deaning, rusr removal, limited paint removal, and re-1.pplicarion of protccrivt coating systems: and pruning and -..c:gctation management.
Evaluating rhc ovcnll condirion of the materials and fcarurcs of rhc property t0 dctenninc whether more than proa:aion and mainttnana: arc required, dtat is, if repairs to building and sit:c karurcs will he ncccss:ary.
Rdiabilitation
Notll«om,,.,ttd,d
Rliling to ,urvcy rhe building .site prior to the beginning of rchahiliwion work which results in damage to, or destrue· tion of, important landscape: fc:mH'CS or archcological n:sour=.
lciving known archcological material unprotcatd so that it is damaged during rchabilia.rion work.
Permitting unqualified personnel to perform data recovery on an:heological resources .so dm improper methodology results in the loss of important archcological material.
AUowing impom.nt Landscape fcarurcs to be lost or damaged due to a lack of ma.intenancc.
Pcnnin:inc rite property to remain unprottacd so that tl\C building and landsc.tpc ltaturcs or archcological resources arc damaged or d.stroicd.
Removing: or destroying fcatura from the building or sitt such u wood siding, iron fencing. masonry balwtradcs, or pbnt rnarcrial.
Failing to provide adequate protection of materials on a cydical basis so that deterioration of building and sire fcatura results.
Failing to undertake adequate mwurcs to assure the prorccrion of building and site ltaturcs.
303
Rehabilitation
Rt!"iriug kawrcs of the buildini; and site by reinforcing hisroric marcriab.
&plnci11g in kind :m cntin: fi.-awn:: of the building or sire that is coo dcrcrior:ucd. to repair if the ovc�I form and detailing ;,.n: still cvidcnc. Physical evidence from me dctcrior.w:d fua.. run: should be used "' a modd to guide dtc new work. This could aldudc an entrance or porch, walkway, or fountain. If using rhc same kind of mau::ri31 is nor tcehnicilly or cconom· k:ally fc:u:ibk:-, then a compatible sub.srirurc marccW may be considered.
���cing dctcrioratc:d or d:unagcd landscape brutes in
Not lwtom11m1tkd
Replacing an cnrirc brurc of the building or site such as a fence, walkway, or driveway when repair of materials and limited compatible: (Cplacc:mcnt of dctcrioraccd or miuini; pata att appropri.l«.
Using a subsrirutc material fur the replacement part that docs nor convey rhc visual :appearance of the surviving pam of rhc building or site btutt: or that is physically or chemically incompitiblc.
Removing a fcarun: of rhc building or sire rhar is unrepairable and nor n:placing ir; or replacing it with a new btun: dtat doa not convey the wnc. visual appearance.
Adding conjc-cNral l:andsc:apc ft:a.Nrcs to the Jitc Juch u pctiod reproduction lamps. fences, fountain.s, or vcgccirion that :arc hiJtorially inappropri:arc, thus crcaring 2 F.Jsc .sense ofhbtotic development.
Rehabilitation
TM foll.wi,'t ""'* it hiiJ,lir)md,. indiattt tht,r ii rtpm1n111M JltllrtkulmlJ c•mp/a r«hniarl or Jair;,1 tUptm •/ RehabilicaUOn proj«I ""'* ,m,J s/»11/J onlJ bt amsidnrd 11fi�r ti# p�rPtttio11 co11ttrns li"td t1bow IN111t btn1 tllidrmrd.
304
Rehabilitation
Setting (District/Neighborhood)
&ro111nm1dtd
ldt!luifying rrt11iui11g. ,u,d pracrvi1'g building :and hmdscapc fc:J.rurcs which .1n: important in defining the hisroric charuter nf rhc setting. Such fui.rurcs a.n include roads and strcc:ts, forn�hinp such as lights or bcncho, vq;ctation, gardens and yards. :ld.ji1ccnt open space such as fields, parks, commons or woodlands, and impomnt views or visual n:b.rionshipi.
Retaining the historic n:buiotuhip bctwc:-cn buildings and land.se.apc fcarurcs of the scning. For example, prtServing the n:lariotuhip between a C'OWn common and its ACijxcnt hUrorie housd. municipal buildings, historic roads, and landscape fcarum:.
Pror«ti"g 111,d 11uti11111U1i11g historic building materials and planr fearurcs tlirough approrrian: deaning, rwt n:moval, limited punt n:moval. 2nd rt:1rplia.tion of protective coating systems; and pruning and vq;ctarion management.
Pmtttting buildinc and lan<UC:lpc feaNrtS such as lighting or ttccs, against arson and vandalism bcfon: n:habilitarion work bcgin.t by erecting prottttivc fencing :i.nd inscalling alarm systems that :in: keyed inro local prot«rion agencies,
Ev:i.lu:ning the overall condition of the building and bnd. scape bnircs to determine whether mote than prottttion and mainttn;tnL-,; :in: rcquin:d. th:i.t is, if repair, to fcatun:s will be nccessmy,
Not Rrronm1tndtd
Removing or radically d,anging those features of the setting whid, an: imporc.nr in defining the historic charaacr.
Destroying the rdationship between the buildinp and landscape features within the scn-ing by widening existing srrccu. changing landsape materials or consmming inappropriately located new sttccts or parking.
Removing or tcloc:aring historic buildings or landscape fcarul'C!, thus destroying their hhroric relationship within thc scuing.
Failing to rrovidc adequate protection of materials on a cydical basis which results in the dcccrior1tion of building 2nd landscape brurc,.
111:rmitting rhc building and .rcning ro tcm1in unprotected so th1r inrtrior or exterior fcarutts an: clarrugcd.
Stripping or n:moving features from buildings or the setting S\w:h 'lS wood sid'tng, iron f'Cncing, tetra cotta balwn:rs, or plant man:riaJ.
Failing to undcmkc adequate mc-.uun:i to .usun: the prottC· tion ofhuilding and landsapc fcarurcs.
11,,ommmd,J
Repairing faturcs of me building 2nd landsape by ttinmtc• ing the historic matttials. �r will also gcncnlly indudc me replacement in kind---or with a comp:uibtc substitun: material--of th0.1t extensively dcccrioratcd. or missing parts of karurcs when thctc 1n: surviving prototypes such as pon:h balusrradcs or paving materials.
R,p/Mit'f ln kind an entire feature of the building or landscapt dm is too dc�rioratcd to repair-when the overall form 2nd dmiling 21< still <Yident -'1ling me phy,ial c,,j. da,cc a.s a modd to guide the new 'NOdt. If using the same kind of material i.s not technically or cconomically kasiblc, then a comp2.tibfc rubstinut material may be constdcrcd.
Rdi.abilitation
Not lktPn1mtntkd
Replacing an entire lnrun: of the building or landscape when rcp:air of mateti1ls .ind limited replacement of dctcrior.1.ted or missing pans art appropriarc.
thing a rubstirutc matttW fur the rcpb.ccmcnt put that docs not convey dte visual appcar.tncc of d,c surviving parts of rhe building or landsa.pc. or dt1..t is physically, chcmolly, or cco-logially incompatible.
Removing a feature of dK building or landsc:apc dlllt i.s unte· pairablc and not n:p!acing it; or rcpl1cing it with a new fca.. tutc that docs not convey rhc same visu2I appcatana:.
305
Rehabilitation
The folla1ui11g 1110rk is hitblighttd to h,di"1tt Witt it rrprmms tlH fN'TJie11Mrly tompkx t«Jmicnl or doit;,1 mp«ts of Rehabilitation pn1)«11 """ 1ho11kJ 011'7 bt toiuidnwl 11ftcr tlH pr«rwtion toucmu /iJtal abo11t haw bm, 11tidrts#d.
Rehabilitation
If• m,r Mlllli.n -f II bUINK lmildint ii tlilli11tU« ,md llithl, tisibkiN dH nnjl..,,,-d, t1hnintU IMJ 1#1 mm dNSlit1Jt1n/J. <••""'I 1La:J.-,lm,,....,..,,fo,,.ml•"'-'•"'1fl"'u? 11ml � ki1d,r,, U#"fmtlmctrriJU, ef •lhn-mitlr11tn i11 Uw JisM'a wl,ich Md«J .,,,. ,, amnmi,'t nNtllwq.. (e) /11 dx ,d,,,bilillflio11, tbt wi11t 11,J i11/JnJ wm ,,mJi,J,«J ,md" IA,rr ,,Jt/ilHlll r:1111trNcud IIMJlrtltf'dJimp,,tttddwW1ildi11j,IIU,,ritfo1111t1nJthtrr«tn.
306
Rehabilitation
A./d,qutfa 1M U1tJrk ;,, tku stetions i.s ,p,itt ofrtn an important mpttt of nhobilittttum prajtclS, it is UJUalJy not part of tht oucr,Jl proms of pm1n1i11t rlmmtter-defi,1ingfi1111ut1 (mai111n11mu, rrpttir. rtp!Artmmt}; mthtr. Jl,l(h worlt is tWmtd for its patmtutl ntgtttiuc i,npact on tht lmi/Jingi hiJtvric c"4rncw. For this rwon, pttrtimlAr cart mun bt talttn not to obsC11rt, radiL-4'/y changr, d.m1,1rr, or dntruy chan1tt:tr.Jtji11i11gjt,1t11m in dJt proms of rth1cbiliL1tiD11 worlt.
Energy Efficiency
Ma.onry/Wood/Architcaural Metals
Irurnlling thermal ituulation in attics and in unheated. cdl:1.rs :i.nd mwhpao::s ro increase 1hc efficiency of rhc existing mechanical sysrcm.�.
lnsr.illing insulating m:itcrial on the iruidc or m:u:onry walls to incrti\SC energy e fficiency where rhcn: LS no charJ.C�rdcfining interior molding around 1hc windows or other interior ;1rchit«ru1al det.liling.
Windows
Utilizing the inherent energy ronscrving features of a building by maintaining windows and louvered blinds in good opc�lc condition For n:nural ventilation.
lmprovinr; therm.ii efficiency wirh weatherstripping. storm windows, aulkinc, interior shades. and if historically ::r.ppro.pri:uc. blinds and awnings.
Insr.illing interior nom1 windows wi1h air-tight gaskets, vcn-1ilating holes, and/or rcm�lc dips ro cruurc proper maintenance and 10 avoid condcn.\'.'11ion damage to his1oric window,.
Iru1alling c:xrcrior stonn windows which do no1 damage or obscure rhc windowt :md fr,1,mcs.
Nor H«ommmdrd
Aprlying thermal insulation with a high moisture contmr in w:lll cavities which may damage historic fabric.
lnst3.lling wa.11 insulation wi1hou1 considering iu effect on inrcrior molding oc orhcr archin:crunl detailing.
Rcmovinr; historic shading d�ccs rather than keeping them in an operable condition.
Replacing histo1ic mulri-pvu:cl sash wirh new thermal sash utili1ing false mun1iru.
Irut:1.lling interior storm windows rhar allow moisture ro accumulate. and damage the windO'w.
Installing new c:xrcrior $torm windows which arc inappropriate in siu. Of color.
Rcplacinr; windows or rransoms with fixed thcnn� glazing or permitting windows and transoms to rcmain inoperable rarhcr th;in urili1.ing them for their energy conserving potential.
Maint2ining porches and double vcs.tibulc cnttancc:s so that they an retain heat or block the sun and provide natural ventilation.
Intaior Features
Retaining historic interior shu1tcrs and transoms fur their inherent energy conserving fcarurcs.
MtdianicuSy,t.....
Improving energy efficiency or cxining mcchanial systems by innalling insulation in ania and bascmcnu.
Building Site
�taining plant mat"Criah, nccs, and landscape fcarurcs whkh
;J::1�solar energy functions such as sun shading
Mlintaining those c:xLSting landscape features which moderate the cfkco of thcdimarc on the setting such a, dcciduow rrets, cvcrgrccn wind.blocks. and lakes or ponds.
N<w Addruom 10 Him>ric: Baildlap
Placing a new addition that may be necessary to increase energy drlcicncy on non-char.acttr-dcfining cbations.
Rchabilitotion
Ounginc the historic ap�rantt of the building by cndos� ingporchcs.
Removing historic interior foturcs which play an cnc,gy con� scrving rolc.
Replacing cxining mechanical systems that amid be repaired for oontinucd use.
Removing plant materials, rrccs, and landsapc fuaturcs that pc,form passive solar energy functions.
Stripping the sctring oflandscapc features and landfomu so Wt cffi:tts of the wind, rain, and sun rcsulr in acc:dcratcd deterioration of the historic building.
Designing a new addirion which obscurc:s, damages, or destroys charactcr-dc6ning feuurc:s.
307
Rehabilitation
New Addition., to Historic Buildings
Placing functions and services required for the new we in nan-charactcr.dcfinini; interior spaces rather th:m constructing\\ new 1iddi1ion.
Constructing II new addition so that there i.s the lean possible loss of historic rMtcrials and so du1t d�ractcr-dcfining fc:a.. mrc.� :1rc not ob.scurtd, dam-'gCd. or destroyed.
Designing a new addition in a manner that ma.kc.-: cle2r wlu.r is hisrorit; and wh1.t U new.
Not Rrcomn1tndrd
Expanding the size of the historic building by constructing a new addition when the new use could be met by altering non-d,arnctcr-dclining inu:rior spaces.
Amd,ing a new addition so that the charactcr•dcfining fcaru� nf the historic building a.re obscured. damagro, ot desnO)'t<l.
Duplia.ring the 02cr form, material, style, and derailing of the historic building in a nav addition so di;1 the new work appears ro be part of the historic building.
lmicuing a historic sryk or period of an:hirccrurc in a new .tddition.
Rtl,nbilillftion. /ikt Pmtrmtion. nrl:Nowim1,t1 fl /111ildin1.'r thnntt owr lirttr. tl11 rct,ntion n,u( rrjllfir tf rxi11int, /,iJU,rir nt1t1nUfb ,r,u/
.fm111m iJ tl11u nl/llff]f ,m,mmtndrd. Howrwr, 1m/ikr l'JTJrrvnrion, d,r tl111tl ,:onl of ll.rlJtfbilit1t1ion i, �rnptttft,/ly--,uJtl Ill or IIUtr tt /,11ildint,i11ortltrlllm«tntU1wttrqnirrmmu. 71,ittlwml#wn O,irllf.O libm,y ""'rxµndtd iH l!JB I wbm tttlditioMl 'I"'""""
r;r::�:;;:t��:n;,:�u;::z, 7n"::t::;; hu:::Z:t�j
:Zit 11M rrrrr tltw1U,,u. l11 ,implt dnip iJ r.mJNtJibk umlt tht hUl#nt form,fou11m, ttml tlr1nilifffi old ,mtl ntwttrrtl.rrrrljtliffermtintrtl. Pltoto: Dn"" Clift•n.
R.«onmundd
Considering the: design fut an attached exterior addition i� terms of in n:larioruhip ro the: historic: building as well as the hi.storic district or nc:ighborhood. DcsLgn for d,c: new work may be contemporary or may n:&:rcncx design motifs from 1hc historic building. In either dsc. it should always be dearly diffcrcntiatffl from the: historic building and be compatible tn tams of mus, materials, rclarioruhip of solids ro voids, andoolor.
Placing a new addition on a non-dtaracrcr-ddiningdcvation and limirini;; the si1r and scale in rclatioruhip to the hittotie building.
Designing� rooftop addition when required for the new we, du.t U Kt bade. from the wall pb.nc: and as inconspicuous as possible: when viewed from the strttt .
Rehabilitation
Not R«ommtntbd
Designing and constructing new :additions that rtSult in the diminution ot loss of the: historic: ch:uacter of the: resource, indud.ing its de1ign, materials, workmanship, location, or utring.
Designing a new addition that obscurcs, dam.ages, or dcstroyschanctt:r-dc:fining fnrun:.s of the historic buikling.
Consrruaing a rooftop addition so dut the hi.sroric: appearance of the building is radially changed.
308
Rehabilitation
Accessibility Considerations
l�nmttttd«I
Identifying chc historic building's char:1,crcNldining spaces, fuin.1rcs, and finishes so th:.tt :.1.cccssibility codc-n::quircd work will not rcsuh in thcirdam:lge or loss,
Complying with barrier-free access requirements, in snch a m:1.nncr that ch:ir.1.cttr-dcfining spaces, futrurcs, and finishes arcprcscrvcd.
Working with !0C1I disability group$, access spcci:disrs. 2nd hisroric prcscmtion spcci:ilins ro determine the most appro-pri2rc solution ro access problems.
Providing barrier-free access that promotes independence for the disabled person ro rhc highest degree prll.ctit':lblc, while p�crving signific.nt historic fc-.1turcs.
Designing new or addirio� means of access thar :arc compatible with the historic building and ia setting.
:::.."':':'�
;;:.�
Not NmJnmttndtd
Undertaking code-required alterations bcfurc identifying those spaces, fuaturcs, or finishes which arc du�r-dcfining and mwt therefore be prtSCr,cd.
Altering, damaging, or destroying character-defining tt:2.turcs in attempting to comply wirh accessibility requirements,
Making changes fO buildings withour fim ming expert advice from access spcciali.n:s and historic preservationists, to determine solutions.
Making ncccs:s modifications rhat do not provide a reasonable balance berwccn independent. safe acccu and preservation of historicfcatura.
Doign.ing new or additional means of access without consid· cring rhc impact on rhc historic building ;1.nd ia setting.
Mnl<int ,t /,,u'/dint ttrt'fflib/r to tht p11bli, is n ,rq1tirtmmt 11Mrr llw Amrn·MtU wilh Di111bilitin Ad of I 990. w}Jtffrutr tk tmtmimt. F,JJ, Jl'l'tllf! orn/Jmuiliw t1>,nJdd1t1 u, ncmri/,i/il] drpntd, 11paR I« lwi.rir11l 1ipifiamu ff/ 11 bnildint 11M tbt 11bili1] to mlfkt rhdltfrl, J,, 11,n, t:armp/n, rJ,,nJ.111/Js lh,,1 r.«ffll n/JoUNtb/r htiP,11 Wm' modifi«/ mltt'ml UNtJ110 inc,wur n,msibilil) with"'" jtopnrrlianx thr l,islorir dJttrrtdtr. Dmwinr, Unifom1 Frtltml Art'fflibilil] Slttn,/,1,d (UF�J &trofi1 Md11unl
Health and Saf-c:ty Considerations
R«onm,mtbd
Jdcnrifying the historic building'5 dt1ractcr-dcfining spaces, fca.turn, and finishes :so dur' code-required work will not rtsulr in their damage or lea.
Complying with health and Slfcty codes, including.seismic code requirements, in such a manner that characrcr-dcfining spaCCJ, fnturu, and fini.,hes an: preserved.
Removing toxic building materials only after thorough testing has been conducted and only after less invuivc abatement methods have been shown a, be inadequate.
t>roviding workers with appropriate pctlOnal protective equipment for h:u.ar<h found in the worksitc.
Working with loal code offic:WS to invacipn: systcms, methods, or devices of equivalent or rupc:rior cffi:aivencss and safety to rhosc prescribed by code so that unnecessary a.ltcrarioru ean be avoided.
Upgrading historic stairways and elevators to mttt health and SUCty codes in a manner thar assures their pn:scrvation, i.e., so that they arc nor damaged or 00$C\lrcd.
lrurallin& ,auiriY<ly designed ""' suppl'CS>ion symms, such u sprinkler systems that mult in rcrcnrion of historic fu:turcs and finishes,
Applying firc-rcr.udanr coatings. such as inrumcsccnt painrs. which expand during fire ro add thermal protection ro steel.
Ad.ding a new stairway or dcvator to meet health and sakty codes in a manner that pn:sccva adjKCnt charaetcr-dcfining fta.rura and spaces.
l'lacing a code-required stairway or dcvaror that cannot be actommodared. wirhin the historic building in a new exterior addition. Such an addlrion should be on an inconspicuous dcvation.
Rehabilitation
Not &cont,rtmdrd
Undertaking code-required alter.i.rions to a building or site before identifying those spaces, fuirurcs,, or finisha which :m: chanctc:r-ddining and mwr rhcrcfurc be prrscm:d.
Alrering, damaging, or destroying character-defining .spa.co, fc:aturCS, and finLffiCS while making modificaOON ro a building or sire to comply with safety coda.
Destroying historic interior features and finisl\C! without careful testing and withour considering less invasive abatement methods.
Removing unhealthful building materials without rq;ard to pc:rsonaJ and environmental safety.
Making cha"GO ro histOt"ic buildinp without fim aplOl'ing equivalent hcalrh and safety systems, mcrhods, or devices thar m1y be less cbmaging ro historic spaces, features, and finishes.
Damaging or obscuring historic stairways and dcv:xors or alterini; adjacent spaces in the process of doing work to meet code rcquircmcna.
Covering chuacrtt-ddining wood features with fire-resistant sheathing whid, results in altering their visu1I appcuincc.
Usin& 6rc-rmnlant coatings if they damage or obscure char.1.crcr-dcfining fu:turcs.
RadiaUy changing, damaging. or dotroying d1aractcr-dcfining spaces. fcaturct, or finishes when adding a new coderequired stairway or dcvator.
Constructing a new addition to accommodate code-required stairs and clcv.ltots on chancccr-dcfining clcvarioN highly vUiblc from the street; or when: it obscures, damages, or destroys characttr-dcfining features.
309
Standards for Restoration
& Guidelines for Restoring Historic Buildings
Ratorwtiw, ii tltfim:d ..u 1hr ttcl.,. lr«m ef tftrlU'dlff; tk1iail« ,J,r fonu, fo1111m. 11,ld Wdrrtttrrof II lro,nt}fll ;, 11pjintf'ffi ,u tt fM"im/Ar /JfflOti .flimt "1 '1tmn.s tf tlx rtnHlwtl offotturrJ jr#,n otlJn' pm,J, ;,, iu hi110711nd
n:if;z;;,t=,"/!",:1:,:1:::zr,1:c�� t1111I p/11111W11t IJllmu ,,ntl ol/HI' tsdNrtJ11iml I/ION'" urAtt 1rwfin1ir1 fi111r1io1111J is ttpJroprinlr 1uid1i1111 rt11om1io,, p,wjttl.
Standards for Restoration
J. A property will be used u ic wu historically or be gi¥Cn a new use which n:ffcca d,c propcrcy's rcnon• rion period.
2. Mci.tttials and fcarurcs &om chc rcstoracion period wal be raaincd And prcscnocd. 11ic removal of maccrials or ahcrarion oHcuurcs, spaces, and spatial relationships dm characterize the period will not: be undertaken.
3. &ch property will be rccognitcd as a phyJical record ofia time. place, and we. Work needed to stabi· lizc:, consolidarc and conserve macr:riab and karurcs from dtc n:scorurion period will be phpicaUy and visually compaclblc, idcncifublc upon dose in.spcaion, and properly documcnccd fur futute racan:11,
4. Materials. brurcs, spaces, and finishes chat charactaizc other hiitorical periods will be documented prior to their ahcrucion or removal.
�- Disrinanic materials, brun:s. finisha, and conmuction ta:hniqua or ca.mplCI of cn.lismanship that charaacrixc: the restoration period will be prcsavcd.
6. Oco:rionu:d kaw,a from the """"''ion period will be cq,;iin:d mhcr dun o:pl=d. When: chc severity of dctcriorarion requires rcplaa:mcnt of a disrinaivc feature, the new katurc will match the old in design, color, n:xrun:, and, where possible, materials.
7. ll<pl=mcnc of missing buua from chc «m>nrion period will be submntiltcd by dOQJmcntiry and phy,ical cvidcna:. A fahc scnsc of him>ry will not be crc>tcd by adding conjcctum brura, lc,rura from other propatic:s. or by combining karurcs thar never o:i.stcd rogcthcr hi.storically.
8. Olcmical or phy,ical tteatmcne>, if appn,priarc, wiP be undcrt>lccn u,ing chc gcnclat 1RC2ns JJO"&blc. Trc:aancnhi that ca.use damage to historic marcri.lb will not be wed.
9. M:hcological == alfcctcd by• prujca will be pnxcctcd and p=rvc<I in plaa:. If such raounxs mu.st be dUrurbcd. mitigation measures wal be undcnakcn.
J 0. Dcsigru char were never o:ccurcd historictlly will noc be conscrucn:d.
310
Guidelines for lu:storing Historic Buildings
lntcod.uction
llathtr d,an m;iint.iining :tnd preserving a building ;is it h;a evolved over time, the cxpra!ed goal of the Standards for Restoration and Guideltl\cs for lwtoring Hiuoric Buildings is to make 1hc building ap� as it did :;u a parriculu-and mon significant-rime in iu hinory. First, those maft'ri:tls and fuanucs from the "rcstorition pcrtOd" arc Klcntifkd, b.ucd on thorough historical research. Ncxr, brurcs from the rcsromion period arc m:lintaincd, protected, repaired (i.e .. stabili1.cd. consolidated, and. con. ttrve<I), and rtpbccd, if n<=sory. A, oppo,,d to other treatments, the scope of wom in Restontion can include rtmoval of fcamrcs from other periods; missing fuiNrcs &am the rcuoration period may be rcpl::r.ccd, lxucd on doc:umcnriiry and physic::i.1 evidence, usint:; trndirional materials or compariblc sub. stiNtt rMttrials. The fin;il guicbncc emphasizer chat only those designs that cm be documcnn:d as having �n built should be re-created in a rtStor.uion proJCCI.
Identify, R.tain, and Pn:scnc Materiols and Features from the Restoration Period
The guidantt for the Crtltmcnc R�1ora1ion bq;ins with rccommencbrions ro identify the form and detailing of chose existing architectural m.neri.tls and fcaturtS thac arc signifian1 10 the rcnonrion period as c:sr.i.blulu:d by historical research and documcnra-1ion. 11\Us, guidance on idn1U/Ji11g, rdai11i11g. a11d pratr11i11: features from the rc.stor:uion period is always given firsc. The histOfic buikling's :ippear.mcc may be defined by the form and detailing of its exterior materi:ils, sud, as masonry, wood, and metal: exterior rc;mn'CS, such ;J.S roofs. porches. and window,;
interior marttials, such as planer and painr. and ina:rior brurcs, such a.s moldings and stairways, room configur.icion and spicial rcla1ionships, as well as nructural and mcc:haniC31 systcmr. and the building's site and setting.
Protect and Maintain Matcriah and ftan:na from the Restoration Period
After identifying those existing materials and features from the rcscor:nion period char mun be retained in the prt>Ct$S of Restoration work, rhcn proterti11g a11d �11i11t11i11iug chem is addressed. Protection generally involves rhc least dcgrc,c of intetvention and is J)fty.lr.ttory co orhcr wori<.. For cum pk, pro1ttcion includes the mainrcnancc of historic material through tn:acmcnu such as rust removal, c:::iulking, limitcd �nt rcrnonl, and rc-applbrion of protcaivc coat· inp; the cydictl deaning of roor gutter systems; or installa1ion of kncing, alarm systems and other temporary prottttivc ffll:a$Ul'tS. Although a historic building will wually require more extensive work, an overall evaluation of its fhysica.J condition should always begin ar thi., ICYC •
Rcp;ur (Stabiliz<, Consolidate, and Cons.,,.) Matc:rials and Features from the Restoration Period
Next, when the physiaJ condition of rcnorarion period features requires addirional work, rrpairi11: by stabilisu,g, co11solitbtti11:, a,u/ ctmserviug is recommended. Restot'l.tion gukl.ncc focuses upon the prcscrv3rion or those marctials and fuaturcs chat arc significant 10 chc period. Consequently, guidance for repairing a historic ma�ial, such as muonry, ag:iin btgiN with the kast degree of intcrvcnrion pcwiblc, su�h � s1tengrhening fragile materials through consolida11on, when :ipproprian:, and rtpointing with mortar of an approprian: sm:-ngth. Rtp:ai°"' masonry as well as wt>od and architectural metals includes
patching. splicing, or otherwise n:infurcing d,cm wing recognized pruc:Mtion method,. Similady, portions of a historic mucrurai systcrn could be reinforced wing contemporary mactri2l such as seed rods. ln Rcstot'l.tion, repair may also include rhc limited rcplaccmcnr in kind-or with compariblc substi,utc material-of txtfflsivcly deteriorated. or missing parts or existing ft.arurtS when du:n:: arc surviving prorotypc:S to uo: u a model. Examples could include �-cotta br.ackcu, wood balustm, or cut iron f'cncing.
0
In Restoration, �/,,ciJtt an enrirc karurc from rhc ratoration period (i.e., a cornice, balumadc, column, or m.irwiy) du.t i.s coo dcrcriora.n:d to repair ffl',l)' be appropriact. Together with document.try cvidcnc.c, the form and derailing of the historic futrurc should be U<Cd u a model fur th<: rtplaomtcnt. Using th<: same kind or material i.s pccfcrrtd; however, compatible substituct material may be considered. All new work should be unobtrusively dated to guide future rtSOn:h and Ctt'atment.
311
If documcnrnry and physic.al evidence arc nor :,,vailablc to provide an ..1ccuratc rc-crcarion of missing fca. turcs. the trcumcnt Rehabilitation might be a bctmovcrall approach to project work.
Remove Existing Featun:s from Other Historic 1'criods
Mon buildinc,s represent continuing occup:,,ncics and cru\ncc ovct time, but in Restoration, the goal is co depict 1hc building ;s it appeared at the most significant time in its hi.nory. TI,us, work is included to rcmO'lc or alttr existing historic limurcs dtat do not rcpn:scnt the rcston.tion period. This could include features .such as windows, cnmmccs and doors, roof dormers, ot landsC;lpc features. Prior to alrcring or removing marcrials-, features, spaces, 2nd linlShcs that charac1crizc Ofhcr histotiCl! periods, they should be documented to guide funirc rcsc.i.rch and treatment.
Rc-Ocate Missing Features from the RestonUOn Period
Most Restoration projects involve re-creating (c:iturcs that were signifant to the building :u a panil:Uar time. but arc now missing. Examples could include a stone balwrradc. :t porch, or cut iron storefront. Each missing fc:1.mrc should be s1.1bs001t�tcd by documentary and physical evidence. Without sutTlcicnt documentation for these "rc-cn::,uions," an :,,ccuratc dcpicrion CU\nOt be ad,icvcd.. Combining b.turcs th:u n�r existed together historically can also crca.tc a false sense of hi.�tory. Using traditional miuttials to depict lo.,t features is alw.tys the preferred approach: ho'N'C\'\:r, ,uing 1.'0ntpatiblc snbstirute nuterial is ·,m acceptable alrcrn:uivc in Restoration bttawc, .is cmphasi.-..cd, the gnal of chis treatment is ro replicate the ".1.ppcarancc'" of the historic buildi,'& .1.c a partiC\1• la, rime, not to rct:tin and preserve all "-isroric nutc:rials .u they have evolved over time.
If documentary and physical evidence arc not available t0 provide an accurate re-creation of misting features, the treatment kthabilitation mi&}lt he a bctrcr overall approach to project work.
Enc,gy Efficicncy/Acca,ibilityC..Nidcration,/ Health and Safety Code C..n,idcration,
11\0C J.a.."finru of the Reuontion guid,uu.-c 11JJn:M work doll(. tn m1.-cr ,K'\,'\'Slibiliry rcquimnc:rm .and health .lnJ s.1fot)' cnJe rcquircmt:nD>; or Smi1cJ t\.'ttt>finin& me.uuro co impl'O\-c encrg)' clfu:k-n9•. Altlwugh chi, wnrk u; quite nlfm .an impm,un a.,(l'-'\:t of JQtnr.ltinn pn}J1.-m. ir i;s usu�i)· nnt p.1.n nf the nV1:rall prnccu nf prolL'l."ting. uahiliting, tnN(J\·ing, or rep.I-iring (�Nra fmm the n:stor ... tinn (ICl1nJ; r.ithcr, sud, wnck l1 mcual far its pxcntW ftl.'[t,1.li\-.: impact on 1hc building'i, htSmric .app:.ir.ancc. for chis r&:.L\on, p:anicular cm: mwt be t.iken nor to nb\Curc, J.im.agc. or dcnrO)· historic ma«:rials or fu.lntl'C'I finm ,hi: n:stnra1inn rcnoJ in 1hc pmca.\ of undcmkin� work 10 meet code anJ energy rcquin:mcnts.
Ratortllioll as tt Trta11,u11t. Wl,n1 tht property} daign, tUChit«t11nt! or 1,iuorical sit'1ifu11.1Ut during a pa,ri<·ul,,r p,riod oftim, outw,itm tl>t pounrial loss of txt1111t nurttri11/J, font11.m, spncts, nnd finislm tlsat d,anuuriu othtr historical periods; when thtrc is subslllnbltl phpirnl 111u/ dommtntnry rvidtnrt far d1t work; nnd whm ronumpMtry altmttions mui addi� tiom ''" not Jlll1111td. Rntomtio11 m11y ht comidtml ai It lrrnlmrJtt. Prior 10 11ndtrlaing work, It par1iru!1V period oftimt, Lt., tht mtoration ptriod. 1ho11/d be ul«ttd ltlld ;iutifod. ttnd a '4mtnnJtltlion pltu, for Rnwration dtwlaptd.
Restoration
Building Emrior
Malolll)" llridr, 11DM tern ama, conam, adobe, lt1k<O and morw-
R«omnimdrd
Idnu;J,u,,. rttJWUNg, mlli prorrt!U1t masonry features &om the rrstorarion period such as walls. brackrts, railings, cornices, window ardtitr.rvcs. door pediments, stq,s, and columns. and details such as tooling and bonding pancms, coatings, and color.
Prot«tiltg ,au/ tnJWIIIUIUltg nwoniy from the restoration period by providing proper drainage so that water docs not 1tand on flat. horizonral sum.co or aCOJmularc in rurvcd dccor:uiV'C fuarurcs.
Oc:aning masoniy only when nrccssaiy 'to halt dctcriomion or remove heavy soiling.
Carrying out masonry surface deaning tcstS after it has been determined that such deaning is appropriatr. Tcsa should be observed. over a .sufficient period of time so that both 1hc immcdiarc and the long range cffcca arc known to enable stlcction of the gcntkst method po,siblc.
Not /1.N,nrm�ndHl
Altering mason()' fctNrr:s from the restoration period.
Rliling ro properly document masonry features from the rcstoruion period which may result in their loss.
Applying paint or otbcr a>a.rings such u stucco to RWOn()' or removing �int or stucco from masonry if rudt treannents cannot be documented to the rtstoration period.
O.anging the rypc or color of d,c paint or coating unless the work can be subsr:antiattd by hisrotical documentation.
Failing ro evaluarc and mat the variow causes of momr joint deterioration such as leaking roofs or gutters, differential sctdcmc:nr of the building, apillaiy action, OC' o:tn:mc �thcr cxposune.
Ocaning masonry surf.aces when they arc not hc-.avi.ly soiled, thus nccd.lcs:dy introducing d,cmicals or moisture: into historic mattrials.
Ocaning masonry su"1.ccs widtout resting or without sufficimc rime for the testing rcs�a to be of value.
312
R«ommmd«J
Cleaning masonry $Urf.i.ccs with the gentlest method p0SSibk, such as low pte$$urc w:ircr and dercrgcnts, wing natural brisdc bmshes.
Jnspecting painted masonry surfaces to determine whahcr rcp:ainting i.\ necessary.
llcmcrving chm:iged or dctcriorarcd paint only to the ncxr sound layer wing the &crulcsr method possible (e.g .. handscr:iping) prior ro repainting.
Applying compatible painr coating .sysrcms following proper surf.u:t prc:p:ir:1.tion.
Hcpainting with calors that ,uc documented to the rotorat1on period of the building.
Evalu:uing the existing condition of rhc masonry to determine whether more th:m prorecnon and maintenance are required, th:at is, if repairs co ma.sonry bturcs from ,he n'.:ffllration period will be nett.wry.
Rtp/U.ring, smbrlizi,ig ,wd roJJJn-PiJ\g fr:),gilc masonry from the restoration period by wdl-tcsrtd consolidann. when ippropriarc. Rcp:urs should be physically and vi..mally comp;uiblc and identifiable upon dose inspection for fururc research.
Restoration
Sandblasring brick or srone surfatts using dry or wet grit or other abrasives. These methods of deaning pcrmancndy ctodc the Nrfu:t of the ma.tttial and accelerate deterioration.
Using a cleaning method that involves warer or liquid thcmic:J solutions when there is any possibility of fn:c?ing ttmpcraturcs.
Ocaning with chemical pmducrs that will damage masonry. such as wing acid on limestone or nurblc, Of �ng chcmicals on ma.sonry surfaccJ.
Appiylng high pressure water cleaning mctho$ that will danugc historic masonry and the momt joints,
Removing pa.int thar is firmly adhering ro, and thus prottcring. masonry .surf.aces.
Using methods of removing Jnint which arc dcmucrivc fO masonry, .such as sandblasting, applic::nion of caustic solu· tions, or high pressure watcrbla.uing.
Failing to follow manufacrurcrs' product and application insuuctions when rcpiinring masonry.
Using new paint colors thit arc not documented to the restoration period of the building.
kiling to undcrrakc adcquarc measures to assure the pro<cction of masonry features from the restoration period.
Removing masonry from the restoration period thar could be sW>ililtd, repaired and conscrvtd; or wing untested consolidants and unrraincd permnncl, rhus cawing further danugc m &agile historic matcrialJ.
Restoration
RtttJm1t,mdui
Repairing m2.1onry walls and other muonry fuaturcs by repainting the monar }oinu where there is evidence rl dcttriorarion such as disintegrating mortar, CJ':lCks in mortar joints, loose bric!.,, damp wal�. or damaged plasttrwork.
Removing dc:ttrioratcd mortar by carefully hancl-,.,J<ing the joints to avoid damaging the: masonry.
Duplicaring and, if ncccmry, rq,roducing period morw in strength, composition, color, and texture.
Duplicating and, if ncccuazy, reproducing period monar joints in width and in joint profile.
Repairing srucco by removing the dama&cd material l\.nd patchint with new stucco rhat duplicat'CS srucco of the rcsc:omion period in sttt.ngth, composition, color. and texture.
Using mud plaster as a sutfacc c.oacing over unfired, unsabilO<d adobe h=usc rhc mud plam:r will bond m the adobe.
Curring damaged ooncrcn: back to remove rhc source of deterioration (ohm corrmion on mcul n:inforccmcnt bars). The new �td, must be applied carefully .so it will bond sa.tisfu:rorily with, and match, the historic ooncrcre.
Not R«ommtnJu/
Removing nondctt-riorarccl mortar from sound jointt, then repainting the entire building fO achieve a uniform appearance.
Using electric saws and hammers rather than hand tools to rmum dcrerioratcd momr from joints prior to repointi.ng.
Rrpoinringwidt mortar of high port land a:mcnt content (unless ir if the conttnt of d,c hi.noric mortar). ThLS can often crcitt a bond that is stronger than the historic material and can cause damage as a result of the dilttting coefficient of OJnn.sion and the differing porosity of the matcdaJ and the momr.
Rtpolnring with a synthetic c.aullung compound.
Using a '"scrub" coating rtthniquc m rq,oint instead of tradirional repointing methods.
Clanging rhc width or joinr profile when ttpointing.
Removing sound stutto: or repairing with new :i;tucco that i$ nrongcr than dtc historic material or docs not convey the nmc visual appearance.
Applying cement snia:o m unfitcd, unsrabilrl<d adobe. 8ccausc the cement stucco will not bond properly, moisture can bca>mc entrapped between marcrials, resulting in accelerated dctctiorarion of the adobe.
Puching concrete without removing the source of dctC'OOr.arion.
313
R«om11m1dtd
�ir"'G masonry fc:aturcs from me n:sc;o�rion period by p;arching, piecing-in, or orhcrwiJc l'anf'orcing the masonry wing rccogniicd prcscmrion methods. Repair may also induck: dtc lin,i<cd replacement in kind-or with compatible submturc marcria.1----of dto.sc ou:cnsivdy dctcrior.ucd or miuing p;,,ns of nwonry features from the rcstorafton period when there arc survivin& prototypes ,uch as tc:cra-comi brackca or .ttonc balusters. 111c new work should be unob«wiw:ly dated to guide future n:sc;ird,, and rrcumcnt.
Applying new ot non-historic su,fx,: m:armcnts such as watcr-rcpcUcnc coatings to masonry only after rq,oinring and only if muonry repairs have: failed co arrcsr warcr penetration problems.
R<storation
Not R«o111111t111kd
Rcplac:U\g an entire masonry feature from rhc rcscoration period such as a cornice or balustrade when repair of the masonry and limited replacement of dcrcrior.uccl or mLISing puu arc appropffl.rc.
Using :l sub.sritutc: material for the rq,laccmcnr pan: dm docs not convey the visual appearance: of the surviving parts of !he: masonry btut< or th,,� phy,ially 01 chcmially incomp:uiblc.
Applying waterproof, water rcpdknt, or non-hls«xlC coarinp ,uch u Stucc:O to muonry u a substinuc fot repainting and masonry repairs. Coarings an: frcquendy unncccssa,y, cxpcNivc, and may change the appcarincc of historic masonry as well» ac.cdcra� iu dcttriomion.
Tix M,p-MttJ Holt# i11 �innd &tpitll. Mid,1�11. UNU dniJ,IM bJ Fm,11 [lDJrl\l'nt/11 tt11tl /milt i11 J!)(J!}. In /!)22. M9ttdd«l 10 dx b.iM for lfNa/J{fwli1tJ.fo1'11/J AjkribtM"Jo«lt/JtlUC,. d1tboMNUMJ�hmJforUM1t1cp,,rlmtntJ. withlfm,,,.,,tlddMnt l9SS. lnthr /9BO,,n1,m-1io11, tlN \\?Wg,ti ,rifi111rl dni,:n 11/fU d«mrd IIHlrr 1if:nifimnt th,,,. Ml']i """ r/Mllf!I, 111,d, ,u II m11lt, tlx tlllditio,u � rrmowd 11,ul tlN h«111 rr111rnrd lo its /,of} 11ppt,ur111a. Dm111i11t: M,,rUJlt L Wmnfr/J. AJA.
Restoration
R«o111111c1ldttl
&p/4ci11t in kind an entire masonry feature hom the restoration period dw is too deteriorated to repair-if the overall form and detailing arc nill cvidcnt--wing the physical cvidcna: as a modd to reproduce the feature. Example$ can indudc large: stetioru of o. wall, a cornice, balwm.dc. column, or stairway. If wing die amc kind ri maccrial is nor «chni-ally or economically bsiblc. fflcn a compatible substitute ma.ttr1al may be coruidcrcd. The new work should be unobrrusivdy dated to guide fururc rcsc:i.rch and m:atmcnt.
Not H«am111c,uud
ltcmoving a masonry fcarurc from dle restoration period that is unrepairable and not rcpbcing it.
71,c follow�nt lu$l0ration work is hi,J,utptd to indiattc rh11t it i11110lua the rrmow,/ or 11htmti#11 of txisti11t hinorit llltUOIHJ fa,t1'm thttt wo11/d lu rttnin«/ in Prt#r11111ion ttnd Rnktbili1ttrio11 rn11r,111na; 11nd the rrpltt«n1c1'1 of 111issi11i 11wonry fttUum ftoH1 tht ra1orn-rio11 �rioJ NIJ"f ,rll IICMI IMtcrilfU.
314
Restoration
Building F.xt.rior
Wood, O.pboard, ..,.d,crboard, mingles, and olhcr wooden ,iding and dca,ratMO elements
&tomnrcndrd
ldnuifyiug, ttMi11i11g, n,,d prarr11i111wood features from the rcstoration period such as siding. com ices, brackets, window architraves, .ind dooiw:i.y pediments: and their paints, finishCl, and color.
l'ror«ti111111rd ,rr11ir,uti11ir1gwood features from the restoration period by providing proper drainage so that wam is not allowed ro smnd on n:1..t, horit.cnml surfiu:cs or accumulate: in dcconri� karurcs.
Applying d1c:mical presc:rv.uiva ro wood lcuurcs .such as beam ends or outrigccrs that u,:: opo.scd to dc:ay hU3rds and :ire tr:1ditionally unpainted.
Retaining coatings soch :lS" paint that help protcer the wood from moi.smn:: and ultr.iviokt light. Paint removal should be: consiclcrc:d only where there is paint $Urfuct deterioration and u part of 11n ovtr.iU mainttnantt program which in"°lvcs repainting or applying other appropriate: protective coatings.
Inspecting painted wood surfaces to determine whether repainting is necessary or if cloning is all that is required.
Removing dam:tgcd or dcttrior.mxl paint ro the not sound fayer using the gentlest method pos.siblc (handscraping and hanchandins), then �nring.
Not R«onm,rmltd
Aiming wood fuitun:s ftom the tatontion period.
Failing to properly document wood. features from du: tt:sfOntion petiod. which may rcsult in their loss.
Applying painr or other coatings ro wood or removing paint from wood if s.ueh tfQtmtnts cannot be: documc:mcd to the rt$tOr.uion period.
O,anging the type or color of the paint or coo.ring unlcu the work an be .wlxtanriaccd by historical documcnta.rion.
f-ailing ro identify, cv.il.uatc:, and cm.r the causes of wood deterioration. induding f'aulty f]a5hing. leaking gutcets, cracks and holes in tiding, dc:tcrionrcd caulking in joina :and scims. pbnt m:attrial growing too close: ro wood rurFaces, or insect or fungus infat.1tion.
U$ing c:hcmical prcscrv.i.rivcs such as creosote: which. unless they wi:rc wed historically, can change rhe appc:arana: of woodfcatura.
Stripping paint or other coatings ro reveal ban:: wood, thus exposing historic:ally coated surf.ices to rhc cffcas of aca:-lcr.1.ttd wc:uhc:ring.
Removing paint that is firmly adhering to. and thus, prorec:ting wood surfaces.
Uti.ng drnructivc paint rcmov.tl methods .such as prop;.nc or butane torches, sandbluting or w:1tcrblasring. These: methods an irttvcrsibly damage hisroric woodwork.
Restoration
R«ommtndtd Nor Rttommtndrd
lhing with care dc:cttic hot-air guns on dccontt'IC wood fca- Wng thcmul devices improperly so rhat the hinoric wood-turcs and dc:cttic heat plates on flat wood surbccs whtn paint work l! scorched. is s.o dci:criontcd th:at total removal is ncccmry prior to repainting.
Using chemical $trippers primarily ro supplement other methods such as handsc:raping, handsanding and the abovcrea>mmcndcd thermal dcvicc:s. Dctac:hablc wooden clements such as shurtffl, doors. and a,lumns may--wirh the proper safeguards--« chcmially dip-stripped.
Failing ro ncutralitt rhc: wood thoroushly after wing chetnia.ls so that nc:w paint docs not adhere.
Allowing detachable wood features to soak to0 long in a caustic solution so th:at the wood grain is r.u.u:d and the surface roughened.
315
Applying compatible paint coating systems following proper surfact: preparation.
Rep:i.inting with colon that arc documented. to the rcstora· tion period of the buildin&-
Ewluating the existing condition of the wood to determine whether more than prorca:ion and maintenance arc required. that is, if rcpain to wood fuaturcs from tl\C rcston.tion period willbcncccs.saty.
&pniri11i. 1111bi/W11x, ;r111{ tfl1un11i11t fragile wood from d\C restoration period using well-tested coNOlidana, when appropriate. Rq,,in should be physicilly and vuually comp:ltiblc and identifiable upon dose iiupcction fot future n:sc.irch.
Repairing wood ftatuns from d\C rcworarion period by p.itching, piecing-in, or otherwise reinforcing the wood using rccognncd prc:scrvation mcrhods. Repair may also indudc the limited rcpbccmcnt in kind-or with compatible substitute m.itcrial-of thDK cxrciuivcly dcrerioraccd or missing paru of fuatura from d\C restoration period where there arc surviving protOtypCS such :u brxkcu, molding, or sections of siding. The new work should be unobtrusively d:m:d to guide future research and tl"Cltmcnt.
&plnch1rin kind an enrire wood feature from the ratoration period duat is toO dcu:rior.ued to repair-if the overall form and dcn.iling arc still evident-wing the physicll evidence u a model to rcprodua: the feature. Example, of wood fcatura indudc a cornice, cntablaturc or balwtnidc. If wing me same kind of mo.ccri.J U not t'CO'lnially or economically feasible, d,en a compatible sub.srirurc marcri:i.l may be considered. 111c new work sltould be unobtrusively dated to guide future rcscard, ia.nd rrcatmcnt,
Restoration
Not Rrron1111allkd
f':liling to follow manufaaurcn:' product and appliation instructions when repainting exterior woodwork.
Ustnc new colon that arc not documcnccd. ro the raroration period of du: buading.
Failing ro undertake :i.dcquatc measures co llSSUrc the prom:-tion of wood fuaturcs from chc n:sror:uK>n period.
Removing wood ftom the rcstomion period that could be stabilrud and consctV'Cd; or using unccsccd consolidana and uncraincd. petsonnd, thus awing further damage co fragile historic materials.
Replacing an entire wood feature &om the rcnoration period such a, a cornice or Wllll when repair of the wood and limttcd rcpla«:mcnc of dcrcrion.tcd or missing pares arc appropria(C.
Using substitute material for the rcpl:i.ccmcnt pare that docs not convey the visual appcarancc of the surviving pans of the wood fcanuc or that is physically or chemic;lly incompatible.
Removing a wood fuaNre from the rcscoruion period thac is unrcpain.ble .md not rcplacin& it.
Restoration
nJt followint R.citoration work is hip/i1,httd to indiaru t!Jttt it inl/OUJO d1t rm,o,,,.,/ or dltmrtio11 of aisti11t hiltork ,uo«i fmt11m tlJttt 11J011/d bt rtt11intd i11 l'rt#rlNltion ,rnd RdNtbilit,ttion trt,rm,n1t1,· dnd tlN �p1,,,n11t11t of 111issi111, 11/0M /trtt11ra from tht ratomtiDn J>mod Illini 11U ntw m11tffllfls.
316
Restoration
Building &tcrior
Architccrural Metals: C.ast iron, stcd prascd tin, copper, aluminum, and zinc
IWOnmundul
ldei,tif.,iug. rdail,i11g, ,,,,J pmm,iux architcaural mceil fi:arurc, &om rhc l'C$lOr.itinn period such a$ columns, capirals, window hoods. ('Ir 11ti.irw.iys:: ,md rhcir finishc:1 and col0ts. ldcnrificatinn L1 :ib('I crirical to differentiate between metals prior to work. Each mer.ii has unique properties and thus requires different crc:itmcnt$.
Pro:«ti11ga,,d m11i11tniub,grcnomion period architectural mct.ils from corrosion by providing proper drainage so that water doc.s nor stand on Aat. hor�ontal surf.aces or accumulare in curved. dccoro.rive fc-:i.tutcs.
Ocaning ilrchirecrurnl mctills, when appropri1rc, to remove cocro.sion prior to repainting or applying othcr appropriare prorectivc coatings.
ldcnrifying the pitticular type of me� prior to any cbnmg procedure and then tc$ting to ffl\lre that the gcndcst deaning method possible i.s selected or determining th:u deaning is inappropriate for the particular metal.
C1caning so& met.lb such :u: lead, tin, copper, rerncplate, and iinc with appropriare chcmic.11 methods because rhcit finishes can be cuily :.1bradcd by blasting mcthod.t.
Not Rttonu11mtkd
Alrering architcctun.1 metal fcaruru from rhc restoration period.
Failing to propcdy document archirectural metal features from the rcsror.arion period which may result in their I�.
Ch.inging the type of finuh, historic color, or accent �chcmc unlcu rl1c w0tk an be sub.nantiaitd by historiC21 documcnr.it1on.
Failing to identify, evalu:are, and treat the causes of corrosion, rueh as moisture from leak.mg roofs or gutters.
Exposing mctab which were intended ro be prorccttd. &om the environment.
Applying paint or other coarings ro mct:als such as copper, brom.t., or stainless Stt'CI that were meant tO be a.posed.
Using deaning methods which airer or damage the historic color, tcxrure, and finish of rhc metal; or deaning when 1r is inappropriate fur the metal,
Removing the patina of historic mcraJ. The patina m:ay be a prorcc:tivc coating on :mmc metals. such as brontc or copper. as well :u ;a significant hLltoric finish.
Ocaning soft mcral! such as lead, ,in, copper, terncplate, and 1.inc wirh grir blasting which will abrade the surface of the mer.I.
R<stor.ition
11,co.,mm,J,J
Using 1hc gcndcst deaning methods fur cast iron, wrought iron, and srcd--lurd mcws--in order co rcmOYC. paint buildup and corrosion. If hand.u:nping and wire brushing have proven indfccrivc, low pressure grit blasting m;y be used as long as ir docs not abrade or damage du: surface.
Applying appropriate paint oc other coating systtms after deaning in order ro dee� the corrcuion r.arc of mcfffl or alloys.
Rcpainring with colors that arc documcn_tcd to the rcstor.arion period of the building.
Applying an approprtat'C prottctivc coating such as lacquer 10 an archiccctural metal feature a:uch as a bro me door which is subjca to heavy pedestrian we.
Evaluaring rhc oc.isting condition of the architectural metals to determine whether more than protection and maintenance arc required. that LS, if repairs to metal features &om the n:storation period will be nca:ssary.
Rtpn.irin:, 111tln1ui,,i, mu/ ctnun'fli11x fragile architectural metal &om the rcstoratK>n period using well-� consolidants, when appropriat<. R<pairs should be physically and visually compatible and identifiable upon dose inspection for fururc rcscarch.
Repairing architecrural metal ftacurcs &om du: rcnon.tion period by patching, splicing, or otherwise reinforcing the metal using rccognittd preservation methods. Rt-pairs may also indudt: the limited replao:mcnt in kind-or with a compatible subsriture marcri»-0f du>&e extensively dcrcrioratcd or missing puts of ktturcs from the rc:storarion period when there arc surviving protocypc.s such as porch balustcrt, column capiWS or ba.1cr; or porch cn:sting. 11,e new work shoukl be unobtrusiwly dated ro guidt future research and rrcatmcnr.
Nat R«ommrnmd
Failing to employ gender methods prior to abrasively clean� ing c.ast iron, wrought iron or sttel; or wing high p�ure grir blason;.
Failing to re--apply prnrccrivc coating systems to metals or alloys �t require them after deaning so fflat acc:deratcd corrosion occurs.
Using new colors that arc nor documcnrccl to the restoration period of ,he buildin;.
Failing to� pedestrian we or new ac.c.css patterns a:o that archiu:aural metal features arc Nbjca to dam� by � or inappropriate maintmano: such ::,,s airing adp.c:cnt sidcw.iillu.
Failing to undertake adequate measures to wu.rc the protcetion of architectural metal fu:iturcs from the restoration period.
Removing an:hircctural meal from the rcsroration period that could be nabilizcd and conserved.; or wing unreskd consolidants and untrained pcrsoMcl, thus causing further damage to &agile historic materials.
Replacing an entire uthitccrural mcral bturt from the restoration period such as a column or a balustn.dc when repair of the metal and limited rc-plao:mcnt of deteriorated or missing pans arc appropriare.
Using a subsriture mattri:u fur the replacement part that doo nor convcy the visual appearance of the: rutviT\ng parts of the architcctUr.al metal feature or that is physically or chemically incompatible.
317
lwpUlci11g in kind an entire archiccaur.J mcW kawrc Ftom the rcscorarion period mac lS (00 deteriorated to repair-if rhc ovcmU form "nd derailing arc still cvidcnt--\Uint the phyiica.l evidence as a modd to n:producc rhc b.rurc. Wmpks could indudc C&St iron pc,tdl steps or roof crating. If usin& the same kind of matcriaj is not n:chnia.lly ot economically feasible, then a compatible substirutc m:uetial m.iy be considered. The new work should be unobtrwivcly d:ucd to guide fururc ,cscarch and tmmnc:nt.
Restoration
� SlitndnrdJ for Rmom1ion ra/Jfor UN 1rµir•f rxiJlinx,fo,1ura fom, ti• mumtiol, pmod tU wtl/111 � f'H1Mtio11 .J mUlillf.fo,w,m fi.,w ii#�. In,._ i"1ldlffflo wlwn 111UIUlf.fo,'1Hm•rr rr/l«nl, 111bui111Jrm,tlffltf/, ""'7k�,uulnrt/ if lhcyton1191lw11ppertm,ttt.J dJt hUloric n1111trinlt. In 11th r.orn,pk nl Pbibtdtlphidi /11dtpmdnttt 1-1,tlJ. dH dock,..,, rr-bllill in J!J12·7J ,ui,'t aat sllmr •-' ,,,./ w;,b fil,n,p,n •ntl Jl«Jff,rr '"-"""•ffllfmntllftiM. Pb.I« I.« H.
Ntls.11.FAIA.
No, &rommt111Ud
Rcmovint; an ardi.itcctur.al metal fcawrc from the rcsronrion period that is unrepairable and nOJ replacing it.
Restor:a.tion
11H followiftt RestoraUOn UJOti is hipli,!Jttd to U1diClft1 dsttt it inwl.,,n d,,. m,,01111/ or 11/Jmttion of o.isri11t historic 11rrhittt11unl md11l fiwh/.TO thttt wo11ul IN rr111i,uJ i1J J>mt,wrio11,md RdN,l,i/i1t1rion ll'ftftn1m11.· 11nJ tlN rtp/Attnunt of nlUIUlt. 11rcl11'ttthlnfl n�,r/ fo,11'ra ftom ti,,. ralPmrion ,eriod Uli11f .a ntw '""trruflt.
318
Building F.xterior Roo&
&co111mmdtd
Identifying, retaining, ;ind preserving roofs and roof features from me tcStomion period. This indudcs the roors shape. such llS hipped, ga.mbrd, :md m:uu:ird; dccot.ttivc features ruch as cupoli15, trcsting, chimneys, and wc,uhcrvancs; and roofing m:ucrial such as sla�, wood, cby rile, and mct'al, as well as sir.c, coJot. and patterning,
Pro1«1i1111111d 111ai11tai111i11a rc:stor.uion period roof by cleaning the gutrcrs and downspouts and replacing dc�rio· r:ncd Aoshini;. Roof sheathing should also be chcdc,d for propct venting ro prevent moisture condensation and water pcncttation: and ro iNurc dm materials arc h'C'C from insect infcsr.uion.
Providing adcqua� anchorage for roofing matcria1 co guard �inst wind cbm:icc and moisture pcncm.tion.
Protccring a bking roof with plywood and building paper uncil it can be properly repaired.
i:.valuating the ocisring condition of marcriab to determine whether more rhan protection 2nd ma'C\tenancc arc rcquin:d.. that is, if rcp;iirs to roofs ;ind rooffci.rurcs wiJI be nca:ssary.
R�pniri111a roof from the rcsronuion period by rcinforcing rhc ��rii1ls whKi, comprise roof fca.wrcs. Repairs will al.so generally include the limited rcpfaccmcnt in kind-or with compatible substitute ma�ri.al-of th0$C cxrcru:iYdy dctcri� rated or missing parts offr:atlucs when there arc surviving prototypes such as cupoJa louvers, dcnrils, dormer toofing; or sl;ira,. tiles, or wood shindcs. The new work dlO\Jd be unobtrusively dated ro guide future research and tteatmcm.
Restoration
Not R«o111111<NUJ
Alrcring roofs and rooffcatun:s from the rcscorarion period.
Failing co properly document rooffcatura from the rcston.· rion period which may rcsulr in rhcir Jou.
°'3nging the type or color of roofing marcrillls unless the work on be substantiated by hinotic:al documcnmion.
Failing co clean and maintain guttm and dowNpouts proP9 crly so that wa.tcr :ind debris collccr and cause cbmagc to roof fasteners, sheathing. and rllC underlying struaurc.
AUowinc roof fun:ncn, such as naW and dips. co corrode so thit roofing material is .subjca to accc:lcr.m:d dca:riorarion.
Pcrmining a leaking roof co remain unpron:ctcd so fflar aced· crated dCf'Cfiorarion of historic building materials-masonry, wood, plaster, paint ;ind snuaural mcmbers---occurs,
Failing to undcn:akc adcqu;irc measures co assure the proccction of roofs and roof fcawrcs from the restoration period.
&placing an emirc rooffuaturc from dl<: restoration period such u a cupola or dormer when the repair of marcrials and limited replacement of deteriorated or missing pans Are appropri11te.
Failing co reuse intact slare or tile when only drc ,oofing .sub-srra� needs rcpbccmcnt.
Using a substituc:c matmal for the n:pl-accmenr pan that docs not convey the visual appearance of ihc surviving pans of the roof or thar i.s physically or chemically incompatible.
Restoration
R«o111111t1ulni
&pkt,U11 in kind an cnrirc roof b.turc from rhc restoration period chat is too dctcriorarcd to rcp:ii,-;f the overall form and derailing arc still cvidcnr�ng the physial evidence as a modcl to reproduce the feature. E.xamplcs can indudc a la°rgc sccrion of roofing. or • dormer or d,imncy. tr using the same land of m11tcrial is nOl technically or cconomiCILlly feasible. lhcn a compatible substitute marcml may be considered. The new woik should be unobnvsi,cly dao:d co guide future n:scarch and rrcarmcnr.
Removing a roof feature from d\C rcrcoradon period chat is unrepairable, and not rcpl�ng it; or fuiling co d�mcnt the OC:W"1¥0tk.
n,, followi11r Racorarion work i11/JINJltS tht rtlllOlllti or d!«mtio11 of autinx historic n,oft ,,,,, ,wf fottum d,,11 would� ,rt,ui,td iu 170t'tlllftio11 ,rnJ &h,,bi/itdtitm IJ'ttfbtim/1; ,md tht rrpltt«mmt ofmi1Ji11x ,wf fo,tUJ'ff ftr,111 till mtomlio11 pniod usi11t ttll 111w 111111c-ri11'1 i11 ordu te m,11� ttn tt«umk lmtorit nppumnu.
319
Building Exterior
Wmdaws
Rrrommtndtd
lde11t!Jji11t, n11ti11U1g, 1t11d pmtr11i11twindows--and their functional and decorative brures-from the rcstor.uion period. Such lc::i.run::s can include fumes, sash, munriN, glazing, sills, hc-.1.ds, hoodmolds. pandlcd or dccomtcd jambs ::i.nd moklin&:5, and inter.Or and o:tcrior shuncn and blinds.
Conducting an indcpth survey of the condition of aisting windows from rhc rcstor,1,tion period early in the planning procc.<S so that rq,air and upgrading methods and possible rcpl:unncnt options can Ix fully explored.
1'1-ot«ti11g 111,d nutillt11i11Uig the wood and archircctur.11 mct2ls from the: restor.ition period which comprise the window frame, sash, munrins . .and surrounds through appropriarc surha: rreatmcnrs such as dc::i.ning, rwt tcmoval, limited paint tcmoval, 11.nd rc-applic:nion of prottefrtt coating: sysrcms.
Making windows wcarhcrtighr by re-caulking, and replacing nr insr.1.lling wcithcrnripPing.1RC'� actions also improve drcnn:tl cOicicncy.
Evuluaring the cxi.uing condition of marcrials ro dc:rcrminc whether mott than prortctK>n and maintcnano::: arc required. i.e. if repairs ro windows and window fuaturcs will be ttqllircd.
Restoration
Not &ro,mntntkd
Altering windows or window fuarutts from the restoration period,
Failing to properly document window karurcs from the n:st0ration period which may rcsulr in their loss.
Applying paint or other coatings to window features or temoving them if .such tn:atrnents cannot be documented to tl\C n:ston.tion period.
01anging the type or color of protective .surface coatinp on window features unless the work can be substantiated by historical documentation.
Stripping windows of sound marcrial such as wood, can iron. and bromc.
Replacing windows from the restoration period .solely bceausc of peeling paint, broken glass. sruck sash, and high air infiltrarion. These conditions, in themselves, arc no indicarion that windows arc beyond repair,
Failing to provide adequate protection of marcrials on a cyclical basa so rhat dctaion.rion of the wind.ow ruults,
Retrofitting or repl2eing windows from rhc rcston.rion period rather chan maint:aining the sash. frame. and glning.
Failing to undertake adequate measures ro assure the protection of window nurcrials from the rcston.rion ptriod.
Restor:ation
11,p,uri"T;wir.dDw frames &nd sash from the =omion period by patching, splicing, colllOlidating or othcrwisc reinforcing. Such repair may also indudc n:placcmcnr in kindor with compatible subnirutc matcrial--of those cmruivdy deteriorated or mlSSing parts when thcte are surviving prototypes such as architraves. hoodmolds, sash, sills, and interior or o:rcrior shunm and blinds. 1ne new work should be unobrrusivcly dated co gu.de furure research and treatment.
Rq/Aru,f in kind a window fnrurc from the rcstonrion period that is roo deteriorated to repair using the same sash and pane configurarion and od,cr design dtfails. If using the same kind of material is not lmlnically or cconomclly feasible wh<n rq,bcing windows dcrcrior>tcd beyond n:p,i,, ,hen a compatible subl:rirutc material may be considered. 11,c new work should be unobrrwivdy dated"' gu.dc furure �rm and trt:ltmcnt.
0 0
Not R«omn,vuud
Replacing an enritt window from the rcst0r.uion period when repair of rnarcrials and limited replacement of dcterio-n.rcd or missing parts ate appropriate.
Failing to teusc serviceable window ha.rdwate ruch as brass sash lifu and sash locks.
Using a substicuet. marctial fur the replaa:ment part that docs not convey me visual apporanc:c of the surviving para of the window or that is physically or d,cmically incompatible.
Removing a windPW fi:arutc from lftt' restoration period dut i$ unrepairable and not teplacing ir, or F.i.iling to document the new work.
320
Restoration
Tht folhwint Restoration 11JOrlt is hithlightttf to mditatt th,u it ;,,/JOh,a the rtmowtl or 11bm1tion of aisti11g hiJtori( windows d1Ui winlUJw fr11turn th,tt would bt rtlllintd in Ptntr-,h·on nnd Rn1abilitati4n rrmtmma.; and tht rtpbtcm1t11t of missing window ft,Jtum ftom tht mtomtion P"iod usinx ,,ll nnu nvrttrittls.
Hmu11UHttdnl
RcmoYing Existing NU..._. From Odicr Hiscoric l'criods
ltcn\n\'lng or :1hfflng win&lnwl nr ,flndow feanans fm�m ndu:r I"'"'"" pmods.,...,h a, lat<t oit,gtr-p,n.: P"II nr inarrmpriatc shuucn.
llnr..'Umcnrina; JNl<'riall and ti:anms J.uing from od-.:r rcri-J, priortn1hcirlllto:r.1tlan"' ....... ..i. 1rpaui1,L:,..,1<,.,. ,-d ""'"''*" " ..... lcanor<s at .,....rial, ohauld be ttoo:d to facilit.uc fU1Un: rcscan:h.
lb:-cn:ating Mwing Fcuwcs rrnm the lwtontion lmod
R&:-..:n:-,uiug a mu.sing windnw nr window ft.arun: ell.Ir o.imd during 1hc n:stnr.atinn p:riod ha.-d nn rhy1ical nr dnwmrn• t1ry,:viJcno:: 1hr o..implC', <WJll�ting • hnndrnn&J or .,hunct
J!.i.iling tn rm,1l\'I.' a windnw fu&tun.: l'mm ano1hcr pc:riod. 1hus a:inf"wing 1hc J..,,iaion of the builJingi sii;nitic.am.i.:.
F.amn� m Jnwmmt \\i�· r\."ol{Utcl Imm n1hn himtriL: pcrioili dwr an: n.i,uwcJ fmm 1hc building .sn tli;at a ,··.du.ahk pnmnn nf mi: historic m:orJ L, ll'\'\t.
Constructint .t ,,ir\00\\• '=.tnm: tlut � p.trt nf the oripnil dcsii;n fur the builJin&, bu, \\"al newr Kt\Ltlly huih; or "11nnrucrini; o ("-a,urc whi1:h wa., rhouglu m have aisu:J dnrini; the ratnr.atinn pnind. hw lnr whi.ch the� i, ,ruutlk.'.inn Jn..,,mcntarinn.
Restoration
Building &lmor Ea:t:ranccs and Porches
Rttommnukd
Idnai/,ini, IYIIWU11t, muJ p10m,U1: entrances and porches from the n:storarion pcrlOd-and their funcrional and decorative features-such as doon, fanlights, sidelights, piluim, cntabl:uurcs, columru, balusrradcs. and stain;.
Prot«ti111 tntd lnlU11fAilU111 the masomy. wood, :and archit1:CtUral metals that comprise: �rorarion period cnm.nccs and porches ffltough appropriatt! Nrfacc tre1.tmans such as deaning. rust removal, limited paint removal, and re-application of protttlivc coaring systtms.
E.valuarini; the cxisring condirion of materials ro determine whether mon: than protterion and maint:cnantt ate �ired, that U. if repairs to entrance and p0rch features will be n=ry.
n "'-· ,
Not R«ommmdtd
Ahcring cnttanca: and pord, fcatut\;J from d,c rtSrora.tion period.
Failing ro propcdy document entrance and porch ltarura from the n:storation pcri.od whid, nu.y result in their lou
Appo/'ng paint or other coatings to cntrancr and porch fcarurt1 or removing them if sud, m:atmcna cannot be documented to the ratoration period.
Ow,ging the type or color of protective surfao: co.arings on cnmncc and porch ftarun:s unless the work can be substantiated by historical doc:umcntarion.
Stripping cnmnccs and pordlCS of sound material ruch 2S wood, iron, tut iron, tcm com, tile and bride.
Failing ro provide adcq�tt ptorection to matttials on a cyclical basil so th.at dctcrior.uion of cnm.nccs .ind porches results.
Failing ro undertake adequate mc-asura: to asrurt me prottcrion ofhlSroric cntnnca and porches from the l'CStol';l.rion period.
321
Rep,tirhit cntmnccs ilrtd porches from the rcuoration ptriod by ttinforcing the historic m:ircrfals. Repairs will also gcnct.1.lly in dude the: limited replacement in kind-or with comp.iciblc subsUnnc m:ucri� thOK accnsivdy dc:ccrionucd or missing parrs of repeated brures where there arc surviving prototypes such as balustrades, comica. cntablaturcs, columns, sidclighu, and stairs. The new work should be unobtrusively dated to guide furun: n:scard1 and treatment.
Rep!Ad11g in kind an cmirc cnmmcc or porch from the rcst0ration period rhar is too dcrcriorarcd to rcpair---if the form and dct.ailing art still C"Yidcru-using chc phy,ia.l cvidcnct � a model to reproduce rhc fta.rurc. tr wing the same kind of m:m:rial is nor tcchnic,,lly or cc:onomically fQsiblc. rhcn o compatible subsrinnc material may be considered. TI,c new work ,hould be unobcrustvely cbrcd. co guide future rcseuch and �mcnt.
Restoration
Replacing an cncirt entrance or porch fca.Ntt from the restoration period when the repair of materials and limited rcplaa:mcnc of para: arc appropriate.
Using a substiNn: material for the rcplaa::mcnt P'1l't that docs not convey the v� .tppcamncc of the sutviving para of the entrance and porch or that ii physia.lly or chemically incom· paciblc.
Removing an entrance or porch fcarun: from the restoration period dta.t i.s unrcpair.ablc and not replacing it; or failing ro document rhc new work.
Prw,io,u ef UH I/Nill rrrl, tin dtt !11tlit11ut1c 1'1tfmion UJnr mrrfollJ numbmJ Jmrw RN.m1i011. StJ,,u•fiti111tltk1Ht111J s«n-raurrtl ;. � ... .,/,;/, .d,m /,.,/ t, « "'""""""' ..,.i,, ,hn, ,,;..,,.11,J. AnJ dmlnll , .. dclni,r,tud 1• Mflt um rrp"lmi will, 11 Ila#•• ,q,limtrtl lo mt1kh UJt oritiMI tlaip1. Pl1t110: MO't"II W. Phi/lip,.
Restoration
71Jt Jolhwi,1/. Restonrion wo1* is Jnr.hut.httJ 10 ilUUWc tlNtt it inwlua the muolltfl or 11/Jmrrio1' of txmii11. histon'c mr,,mcc ,r1,d p,rrh fa,hUts tlJttt r11111,/J � rtttri11d in l'rt#r11ttrion 11nJ &ht,i,iGttftion tm11mma; tfnd ,IN rrpbt«111�n1 ofmUSUlf tntrttllt't ,,,,J �rrh fo,tHl'tl ftom tlN ratomri011 �riod lllint tfll nr11111uttrrilfk.
322
Building Exterior
Stordionts
R«on1111t#dtd
ldt11ti.Jjhtt, nuri11i11,:, n11d pn:nr,,i11g storcff'Onts from chc rcstor:a.tion pcriOG--4.fld chcir function11 and dccorati.>rt fui.Nres--5Ueh ;u display windows, signs, door,, transoms, kidc. plircs, comer pos:ts, and cntablatures.
l'roucti11i a1Nl 11111i111Ai11i11i masonry. wood, and architcc· Nral mct:ils which comprise restoration period storefronts duough appropriate Hntmcnts such .u detning, rust rcmoval, Hrnircd paUlt mnonl, and =1>pliation of protce.· riw coaring systems.
Pron:cting storefronts ag.iinsr arson and vandalU:m bc:fon: restoration work bcginr by boarding up windows and installing alarm syuenu that arc keyed into loc:i.1 protection agencies.
Evaluating the ext.Iring condition of non:front marcrials to determine whether more chan prorcction and maintenance an: required, that 15, if repair, to fcarures will be necessary.
Restoration
Nor R«o111111tmkd
Altering storefronts-and their fcarutt1-from the res ton.· rion period.
F:ailing to properly document itoreff'Ont fcarures ff'Om the restoration period which may result in ,heir loss.
Applying paint or Olher coatings to storefront features or rcmovinc them lf such w:atmcnu Qnnoc be documented to
d,c rc:ston.rion period.
Changinc the type or coku of proccaivc: sur&cc coarings on storefront fcarures unless the work an be substantiated by historial documentation.
Failing to providc adcqU:1.rc protea ion of maccrials on a c;ydi· cal basis so chat dccaiorarion of storefront Features results.
==::��i
d::::!'����t�:w�:1: arc damaged by exposure to weather or vandaHsm.
Sa ripping storefronts of hinoric maa:rial from the n:srora1ion period wch as wood, c:ut iron, rem cotta, c:u·rara glass, and brick.
failing 10 undertake adc.-q�te measures to murc du: protcc· rion of storefront materials ff'Om the taroration period.
Restoration
&com1111»dtd
&p,,i""'t ston:fronts from me n:storuion period by reinforcing the historic mao:rials. Rq,ain will also &«1mllY include ,he li!'fticcd rcpJaccmcm in kind-or with compatibJe rubsritutc mataials-of those cxrcnsivdy dcn:riorucd. or mi.a:in, paru of storefronts where then:: arc Nr¥iving proc:ocypcs such as mn,oms, kick platcr, ptlastcrs. or signs. The new worlc should be unobuusi--dy dated ro gui&: future ccscarch and tteaancnt.
Rqbtti»f in kind a storefront from the rcstora.tM>n period that is coo dcrcrioratcd ro repair-if chc oYCrall form and dcrailinc an: nill cvidcn,-..,ing the: physical cvidcna: as a model. If using chc same material is not tcCnnically or cconomQlly kuibJc, then compatible subsritua: marcrials may be considered. The new work &hould be unobmisivcly dared to guide furure racarc:h and atatmcnt.
Not&commnukd
Repb.cing an entire storefront karure from the rcnon.rion period when repair of mare rials and limited. replacement of its parts arc appropriaa:.
Using subsrirurc material fur the n:placcmcn.t pa1t that docs not convey chc same viswJ appcar:u1a: as the suiviving parts of the storefront or d1at is physically or chemically incompariblc.
Removing a storchvnt fcarure from rbe rcsrorarion period that is unrcpainblc. and not n:placing it; ot wling a> document chc new work.
T'IN followillf Raton.tion N10rk is hi,1,/i,J,t� lo indJ"r11u thttt it in11t1Wts tM nn,01111/ orttbrrrtt#ln of o:i1til1t hutont Jtortfomt fotturtt tht,1 u,o,Jd bt rruu,Htl in Ptotn,,,rtiou 11ttd RthnbilihltUJn trattmmts; 11nd rht rrJUam,111 of missint srortftont fouum fty,u dN rtttomtian period usint 111/ 11tw 111/fkrulls.
323
Building lnwior St"""""'1Sys1CmS
R«o,u11u,u/nJ
Jd�11tifJi11t, rr111i111i1g, 1111d preserui11gmueNr.il Jy:Stcms from the rtstor;rion period-and individual bNrcs of systcnu-sud, as post and beam sy.nenu, trusses, summer beams, vigas, an iron columns, above-grade none foundation walls, or lo:ldbcaring brick or stone wails.
Prot«ti11g 111,d 11UU11tAi11i11g die strucNnd system by cleaning du: roof II'"'"" •nd down,poua: replacing roof ftashing; keeping masonry, wood, and 2rehin:c:rural metals in a sound condition, and ensuring th.at stNaur.t.l mcmbcn arc frte frominscctinfosrarion.
Wminlng and cvilu.ating the physial condition of the mucrural system and its individual f-cuturcs wing non-destructive rcchniqucs such as X-ray phoc:ogr.tphy.
R�pairi111 the structural £)'Stem by augmenting or Upt;rading individual parts or fcarurcs Ul a m11nner that i.s cowLStem with die restoration period. For example, wtllikcned nrucnual members such llS Roor fo1ming can be paired with a new member, braced, or otherwise supplemented 11nd rclnfurcccl. The new work should be unobuusivdy da!Cd to guide furute research 11nd nca.tment.
Restoration
Not R«ommcntkd
Altering vLSiblc: bnua of suucrural systems &om 1hc ,aror:ation period.
Failing to propcdy document strUCNral systems from the restoration period which may r'Cl\< in their loss.
Overloading the existing sttucrund system; or installing equipment or mechanical 1)'5tcms which could damage the StNeNtc,
kcplacing a loadbcaring mawnry ,nil that could be :iug· mentcd and rcaincd.
Leaving known struerural problems untreated such as dcflccrion of beams, cracking and bowing of walls, or r:acking of mucrural mcmbc:rs.
Failing to provide proper building mainrcnanc.c so chat detctiorarion of the .muctUnd JyStcm rt$ula. Causes of dctcriorurion indude sub.surface ground movement, vegetation growing too dose to founcbrion walls, improper grading. fungal rot, 11nd poor interior ventilation th11t results in condensation.
lkilit.ing dcstNaivic probing tcehnklucs that wiU damag-c 01 destroy StNUUraJ m;tcriaJ.
Upt;rading the building mucrurally in a manner tNt dimin• is.hes die historic character of thc exterior, such as inst2lliR(; nr:apping channch or removing a decorative cornice; or thar damages inr«ior fuaNrcs or sp:accs.
Rcpl11cing a structural member or other fca.rurc o( rhc snuc• rural system when it could be augmcmcd and m-aincd.
Restoration
&p&tchlf in kind-or wirh rubsdrurc nutcrial--<hosc por� rions or fnnm:::s of the S:ffll'Nral l)'St'Cffl (pat arc cirhct extensively dcrcrioratcd or arc mi.sling when rhcrc arc rurviving prorOC)'pCS such u asc: iron columns, roof rafu:q: or trusses. or section, ofloadbcaring walb. Substi�tc matcrial should convey the same fonn, dcsip, and overall visual appearance as die historic brurc. and. 2t 11 minimum, be equal to iu loadbcaring ap:ibilitics. The new work dtould be unobuusivcly dated ro guide fururc research and ncumcnt.
JV.,Jl«wm,,,,..J,d
Installing 11 visible replacement fuarun: that docs not convey ihc """ viswal appc:a0>ncc, e.g., n:placing ,n cxpo,cd ..-I rummer beam with 2 steel beam; or f.iiling to document the rw:wwod<.
Using substitute mala"W th.at docs not equal the loadbcaring capabilities of me historic material and design or i.s otherwise physically or chcmK2lly incompatible.
The fallowilJt Raton.lion UJOrlt is hif/Jll,J,tai ro Jndim1c dHft it imd11t1 d11 rtmo,w,J or nltmrrio11 of txistirtt hutrlric stn«rurtrl sptt11u ;,nd ft,,ti,ro tDltt w,,Jd ht rtfllinnl in /lmn-&1ttti#11 ,md &1Mhilit111Ml11 tm11111tt1� ,mJ d,e rrplAm,1mt of missi11t 1trwt11ml IJSIOH fo,rum fto111 dN rtstomtion period usillt 11JJ ntw 11urttrinls.
324
Building Interior
Spaces, Featura, &nd f"...W...
Rtco,m,,rntud
lntcnor Spaces
Idnuif,i11t, rtMiui,11, aud praer11U1g.i floor pl:m or interior ${).\CCS ftom rhc n:stor,uion period. 11lts includes the size, configuratian, proporrion. :md telatioruhip of rooms and corridoo; rhc rclarioruhip of features to spaces: and the spaces themselves, such as lobbies, reception halls, cnm.ncc halls, double p:ufors. theaters, auditoriums. and impomnt indusrrial or commercial spaces.
Interior Fcarurc.• and finiJhCJ
Jdn1tif.,i11g, rrr.ai11ilix, ,md pran-11i11gintcr.Or fca.rurcs and finishes h"C>m the rcsrorarion period. These include columns, cornia:s, bucboarcb, firq,bccs and manrcls, panelling, light fo:turc.s, ha.rdw.ut, and flooring. and wallp1per. plutcr, paint,
:�::d�::c\:a:�t1
!�:�·a��!�;����:� t�:::��d
provide color. tc"Xrute. and paro::rning to walls, floors, and ceilings.
Prot«tiug a11d t11ni11t11i11i11gm�onry, wood, and att:hitccn11o1.I mCD.ls that emnprtsc n:stararion period interior features through appropriate surface matmems such u deaning, rust rcmoval, limircd paint removal. and rcapplic.J.tion of protcc· rivt roaring systems.
Restoration
Altering a floor plan or intt'rior spaces-including indMd\1:J rooms-from the n:srorarion period.
Ahtring ftaturcs or finishes from rhc restoration period.
Failing to properly dorumcnr spaces, fotun::s, and finishes from the rcsronrion period which may rcsulr in their loss.
Applying paint, plasrcr, or other finishes to rumccs unless the work can be subst;inriattd historical documcnarK>n.
Scrippinc: paint to bate wood rather than repairing or reapplying gr.tined or marbled fini.shcs from the restoration period ro fe:>.turcs suc:h u doors and p:inclling.
Changing rhc type of finish or its color, such as painting a previously varnished wood f.carurc, unless 1hc work can be subsramiatcd by historical documenmion.
failing to provide adequate protcttion to materials on a cydi· cal lnsis so that deterioration of interior fcatura results.
lw,toration
Procccting interior spacts, features and finishes �rut arson and vandali.sm before pro;«t work bcgiru. crcain; protcctt\'C fencing. boarding-up windows, and installing fire alarm sy,# rems that art keyed to local proo:aion agencies.
l'totcaing interior features such as a miftaSC, mantel, or dccorarivt finLShcs and w:JI coverings against damage during project work by covering rhcm with heavy canvas or plasric: .hccu.
Installing pton:crive coverings in areas of heavy pcdcsttian � to prots:ct hismric faturcs such as wall coverings, parquet flooring and panelling.
Rcmovin; dam2tcd or dcttriontcd pa.inu and finishis to the next sound layer wing the gcnrlcst method possibk, then repainting ot tdinishing wing compatible paint or other coating systems bastd on hismria.1 documcnta.tion.
Repainting with co\ors that arc documented to the building's restoration period.
Lim iring abrurYt deaning mtthods m certain industri:al warehouse buildings where the intttior masonry or plaster features do not have di.uinguishing design, detailing, tooling, or finishes: and whctc wood fcaruro: an: not finished, molded, beaded. or worked by hand. Abrasive cloning 5hould only bt considctcd after other, gender methods have been pnm:n incffuctivt.
Evaluating the txisting condition or materials to determine whether more than protcaion and mainfalancc arc required, that U, if repairs to interior features and finishes will be ncccssa,y.
Not ll«r,m"""dtd
Permitting entry into historic buildings dnough unsecured or broken window, and doors so that the interior f'catun:s and finishes art damaged by aposucc to wo.d,cr or vandalism.
Stripping interiors or n:storation period ftatun:s such as woodwork. doors, windows, light fixtures. copper piping, ndiators; or of decorative matcrials.
Failing to provide proper protection of interior brures and finishes during wotk so that rhcy arc gouged, scratched, dcno:d, or odlffl'UC dam>g<d.
Failing to take new we patterns into consklcrarion $0 du.t intcJior features and fini.shcs arc damaged.
Using destructive methods such. as propane or butane rorchcs or sandbJasring t0 mnovc paint or other coatings. ThCJC methods can irreversibly damage chc historic matcriah chat comprise interior fcarurcs.
Using new painr colors thar arc inappropriate to rile building's rcstoncion period.
�nging rhc ccx.rurc and patina ('If bturcs from the n:stor:ation period through sandblasting or use of 2\:insivc methods to mnovc paint, discolor:arion or plaster. This indudcs both exposed wood (including strucn1ral members) and masonry.
Failing to undcmkc :idcquarc mClSurcs to assure the protcc� rion or interior Fearurcs and finishc.s.
325
Nep,,iri11t interior r�rurcs and finishes ftom the rcstor:nion period by re inforcing; the historic materials. Repair will also gcnmlly indudc: rhc limirtd rcpJaccmc:nt in kind-or with compariblc substirurc matcrW-Of chose cxtcnsivcty dctt:riontcd or missing p.tns of repeated. fnc:un:s when dme: arc surviving prorocypcs such as srairs, balwttadcs, wood pandling. columru: or decorative ,vall covcrincs or ornament.II tin or pwccc a:ilinp. The new woclt ,hould be unobmuivdy daccd a, guide future mtilrch and trt:umcnL
&pbuiux in kind an entire interior fcarurc or finish from rhc racorulOn period that is too dcttrlOr.ucd. to ccpail'-f.f the oven.II furm and detailing arc st�I cvidcnr-using the physical evidence as a model for reproduction. Examples could indudc wainscoring, a tin ceiling, or inct'rior stairs. If using the: amc kind of nwuW U: not tcchniadly or cconomally li::uiblc. rhcn , comp:acible substitute material may be cccuidcrai. The new work should be unobmuivcly dated ro guide future research 11nd ttc11rmcnr.
Rcnoration
Not Rm,1111m1ulul
Replacing an inl'CnOr feature &um the restoration period such as a .sr.1ircasc, p.u,dlcd waU, parqutt floor, or cornice; or 6nish Juch ;u a dccor.uivc wall CGVmng or ceiling when repair of mattrials 2nd Gmitcd rcplatmlau: of such p,1tt1 :arc appcopri:uc.
UJing a 1ubstinm: material fot d,c rcpl:accment part diar docs not convey the visual appc:arance of the surviving paru or porrioiu of the interior feature or finish or that is physially or chcmic::Jly incomp:ariblc.
Removing a feature or finish ftom the rator:acion period tha.1 "unrepairable and nor rcplacin& ir, or failin& to document the new work.
A cr,m,Utt J)dinl inllfflW,1ion efm, ,,m1, 111 /,,,t tondnttttl ,l11ri11t Rnl1Hflti4n. l¾,i11t Mmpla n,r m,rfi,lly coll«ttd ons1it. In 1/N /Al,,,m10,, '"' 11/trrt 11i.ln lit.ht is 1uttl 10 blt11tif, piplnit 11ml 6i,uli,'t ,HttliA. /+,i,u 11tmpla t1n d1t11 �fJbtrl. Pb]littd n,u/nur dott1111tN1td tJ,,.u,.h Wl,muo,y rtNtttrh 1IWIIWf 111011wl l,,,ai, fw"" 11crum1t '"''"'u;.,. ef'1"ir11td fi11ul,a, 1ud,,,, llw tr1utp/c.· 11mtillinilft11rml '""· Ph.I# ltft: C,,ma, AltxU Elu; Pl»,- ntl,1: Coa1n19 AtJrrtt GiltMrr.
Restoration
Tbt followi"I Ratontion ,uo1* is hixJ,lipttd 10 1itdiaf1, d111t it inlttHlltS d1t "'"'""'' or ,,1um,io11 of aiJli111. hutorit iamior 1/'(fra. fo,tiurs. ,,,,,J fi11iJha thtrr w,,JJ be rttdintd ;,, /Jrtm1Mtio1111,uJ &l,,,.bili1,ttion trt1111nr11rs; 1111d � rrp!Aam,,,, ofmi»int inttrior ljNfttS. /tttturo. 11nd fi11uha _from 1ht rrstomtio11 j>triod usint ttll 11tw 1111tttrit1h.
�1nisun1.pltatn�n1icr ,._,mtnwft11'4"'•/1tu fft'Mllp,.j«,l#rt1Jtn111m· wkntt u, i1sqh111/ t1ppmr-1111tt. Tbrlnltlilnlllll UHdJM of proJ#IDttt ti c,r,utt ii •JtmlUlttti lot/9 Pbot-.· OIJ-HNIL faumtd.
326
Restoration
Building Interior
Mcd>anical Syotcnu; Heating. Au Conditioning. El=ical, and Plumbing
Id�1u!f,i-r, rr1Ali1iui, .,,d pran-11;11,visiblc 6:arun:s of mechanical systems from the restoration period such as r.adia• tan. Ymts, F.t.ns, griUc:J. plumbing fixtures, switchplarcs, and lighlJ.
l'rvt«tUlfand 111111i111ti11;11tmcchanicd, plumbing. and elcc· rrical .syncms lilnd their features from rhe R:ICOmtion period rhrough cydic:J dellning and orhcr appropriate measure.,.
PtcVCnring accdcntcd dcn:rior.arion of mcch,mical sy,rcms by r.roviding adcquao: ¥<:ntibrion of atria. cnwupaccs, .,,d cdars so (hat mois(utc problems o.rc avoided.
Improving the energy efficiency of existing mcchanioJ sys. t:cms to help reduce the need for daboracc new equipment.
&ptiiri,,x mcch,mk:al sysrcrns from d,c rcsror.aaon pc,iod by augmenting or upgr.lding system puu, such u insa.lling new pi
pes and duers; rewiring; or adding new comprasors or
l>oUcn.
&pl,rc,"ut in kind-o, with compatible subs:tinnc marcrialrhosc visible f'carurcs of rcsrcmuion period mechanical S)'SfCfflS that arc either cxrtnsivdy dcrcriorarcd or arc prototypes such as ceiling r:ms. swirchpWc:s. nd.i:uors, grilles. or plumbing fixtures.
lnst.Uling Iii. new mcch:mic:a.l sy,rcm, if �uircd. in Iii. way 1hat n::sulu in the lc:ur alteration possible to the building.
�t Htcomumllkd
Altering Wible dct:or:uivc fuuurcs of mcch::mical syncms from the rcstOQrion period.
Fa;Ung to properly document mcdwiial oy,rcms and their visible dccorarivc bturc.t from the restoration period which nay result in their loss.
Failing to provide adcqua(c pl'Olccrion of maccri:Js on a cydi� cal basis so thar dctaionuion of mechanical syffCrN :i.nd their visiblcfcarun::src.tula.
End ming mechanical systems in areas fflat an: not adequately vcan1atcd so that deterioration of rhc sy1tcms rcsuhs.
Installing unnecessary air condirioning or dimatc control ')'I· n:nu: which can add cu:cssivc moisture (O die building. This additional moisture can either condense inside, d;imaging interior surf.t.ccs. ot pass through interior walls to 1hc arcricK. porcnri:Jly damaging adjacent m:i.terWs as it migratCS.
IU:pl:i.cing a mechanical system from the rcs(orarion pcnod or its funa\Onal p.tru when it c:ould be upgraded and retained.
Installing a viJiblc rcpl:i.ccmcnt futrurc thar doc:s nor convey the same visual appcanncc.
lnsta.lling a new m«Nnical system so (hat struaural or interior rcaturcs from the n:sro�ion period arc :Jren:d.
Restoration
Hrcommmd«J
Providing adequate structural suppon for new mechanical equipment.
lnscaJling 1hc vertical runs of duas, pipes. and ables in dos.c:ts, 1CtYicc rooms, and wall avirics.
Installing :i.ir conditrDning unia: in such a mannc:1 that fca# N.l'CS 11tt. noc: damaged or obscured and �ivc moisture is nor generated that will ac:cdcrate dc<crioration of historic materials.
N01 R«o111111�11Md
Failing to consider rhc wcighr and design of new mechanical equipment so that, as a rcsi.al'r, bi.srorie srruaural members or finished Nrfaa:s an: wnJ..ncd Ot aackcd.
INUIUng vernal '""' of d11C1S, p;pc:,, and coblcs in pw:cs where they will obscure features from the rc:storarion period.
Cono:aJing mcchanica.l cquipmau in walls or ccilinss \r\ a manner that rtquff'C.1 me n:m0¥al o(buikiing m;m:ri.al from the """"''""' period.
Cutting through bturcs such g,s masonry walls in order to install ai, condirioning unia.
711t foU0111i11t. Restoration work is hitllUflnd ro h1tliadt dMt ;, i11l/0Ultl ,IN""''..,/ or 11/Jnntion of o:#tint. historic mtth,miml ,ystn,u tt1ul fitt111ra dMt H1011IJ bt rttlfintd i11 Pramwion tt1,d Reh11/,i/i1111ion trttttmmts.· ,,,,J tlN "pln«mt111 of mimn: m«hnniMI SJlkliu tt1ui fia1111t1 from !IN ratomti011 J>niod IUint •II 1ttH1 mt1ttritfls.
327
Building Site
ldcmifyinc, rcraining, and preserving rcstonarian period buildings and their bturcs as wdl as bNrcs of the sire. Site features may indudc circulation syJtcms such as walks, paths, roads, or parkin;; vegetation .such as ttca, shNbs. fields, or herbaccow plant material; landforms .such m tcr�cing, berms or gnadin&; furnishings ,uch as lighu, fences, or benches; dee· or:uivc clements such as sculpture, mtu:uy or monuments; w.ucr bturcs induding founruiN, srrcanu, pools, or l:ika. and subsurfucc archcological features which arc imponant in dfflning the resror-,uion period,
Restoration
Nat R«o111mc1,dtd
Alctting buildU\gs and rhdr fcarurcs or sin: fearurcs from the l'CKOnation pctiod.
Failing ro propedy documenr building and .siac fcarurcs from the rcstorauon period which may n:sulr in d1cir loss.
TIN, r,,. 1900 p/H110f"lp/, rkji) ,.,11/d W inw,/tu,1,/r lo triitli-mtr,nrll°r,n •f dw d�rri,mlffl lw1« (rif,b,) I# iu dtKHmrNlrd twrlicrnppmm,1tt, tomplni- 1ui1/, tlmmtiw trim, J11mm. Jo1Jd1rr11nnl rxzrrior. nntlft11ti'nf., Photos.· C.ttrt")' Nortl, Cmoli11n lkpnrtmmt •f .Artbim n,J His111,y.
Restoration
llc-<ml,Ji,hing the n:larionship bclWl:CII buildinll' and the landscape that existed durii;ig the rcst0rarion period.
Proum111-' m,aut,rn,i111 buildings and the site by pnmding proper drainage to assure that waa:r doer not erode foun. clarion walls; drain roward the building; or damage or erode chc landscape.
Minimizing disturbano: of tcrnin around buildings or else· where on the site, thw reducing the possibility of dcmoying or damaging impomnt 1:mdscapc features or udtcologial """"""'·
Surveying and documcnring tttas where rhc rcrrain will be altered during restoration work to determine du: potential impact to landscape features or archc:ologial resources.
Protecting. e.g., preserving in place, important arc:hcologic:al n:soun:es.
Plannlng; and carrying out any necessary invcstigarion using probsional archcologi,a and modem archcologic,J mcchod, when prcxmtion in place u; nOf fca.sible.
Pn:scrving important landscape features from the rcm,mion period, including ongoing m;aln«nancc. ofhisroric plant i'natcrial.
Protecting building and landsapc features aga.inn arson and vandalism before (Cffl)t.1.rion work begins, Le., etccting; pro-ccam: kncint; and inswling alarm sym:nu chat""' J.qed into local proccction agencies.
'Not &con1111mtkd
lt&:wning non•resroration period buildinp: or bncbc:apc fu.1,11e,.
niling to maUltaln adequate: sin: drainage so lmt buildings and site features arc damaged or destroyed; or alternatively, changing the site grading so that wan::r no longer drains propcdy.
lnm>ducing heavy machinery Lnto artaS when: it may disturb or damage important bndsapc features or ardu:ologicaJ n:sourus.
niling to survey dte buildin;.s� prior ro bc:ginnW'\g rcston· rion work which rcsulu in damage to, or dcstruaion of, landscape features or archeological resources.
Leaving known archcologial material unprotccecd so that U" is d:anugcd duri"G n:storarion work.
Pcrrnining unqualified pcnonnd lO perform dar.t n:<O"")' on archc:ological rcsounx.s so that improper methodology results in rhc loss ofimpomnt archcologial material.
Allowing fCftOQaon period bncbc:apc bnua 10 be l00t or damaged due ro a lxk of m�ntcnancc.
Permitting rhe propctty to n:m�n unprotected so chat d1c building and landsc:apc fc.trun:s or archcologial raoura:s arc damaged or dcsu")'<II.
Removing n:stor:uion period fcarun:s from the building or sicc such .u wood siding, iron funcing, masonry balustrades, or plant man:rial.
328
&ttl111111mdtd
J�vidin& continued protc:crion ofbuildins m� and plant fcarurcs from chc rcsroration period through appn:ipriart deaning, ruJt n:mO'r.d, limited paint removal, and rcapplicuion of prorcctivc cm.ring.systems; and pruning and vcgcration management.
Evaluaring the cxistint condition of maccri.tls and fcarurcs to dctcfminc whether more dlan protcetion and maintenance arc: required. d1at is, if repairs to building and sicc fc:uurcs will be ncxcu::iiy.
kpt1iri11t restoration pctiod features of the buikling .lnd sin: by reinforcing hisroric materials. The new work should be unobtrusively dared ro guide fururc research and treatment.
Rtplnciut in kind an cnrirc restoration period fuuurc of the building or sin: d,u is roo dcn:rior.um to rq,air if the oYCrall fonn and derailing arc still evident. Physial evidence from the dcn:rior:Kcd brurc should be wed as a modd t0 guide the new work. Tilis could include an entrance or porch, wulkway, or founraln. If using the same kind of material is not rcchnically ot economically fwibJc, then a compatibJc rubstirutc m.i.tctial may be CONidcn:d. The new work should be unobtrusively dared ro guide fururc racarch and treatment.
Rcpfacing deteriorated or damaged lan�pc fcarurcs of the restoration period in kind or with comp:uiblc substirutc material. 1'hc rcpb«mcnt fuiturc should be based on ph)'Jical evidence and convey the same appearance.
Not H«t,r,1111,mdnl
Failing to provide adcquacc pn>tCCtion of materials on a c:ydial b.uis so that dcrcrior.irion of'buad.ing and site fc:uurcsn:su!a.
Restoration
F.tiling to undcttakc adequate mcasurcs to .1$S\lrc the prorcxtion ofbuilcHng and si(c farura:.
ltcplacing an entire rcst0rarion period fcarurc of the building or sire such as a fence, walk.way, or driveway when repair of materials and limited compariblc rcplac:cmcnt of dcterior.in:d or missing � are: appropriacc.
Using a subscirucc material foe du: replacement pan: (hat docs not convey the visu.\l appearance of the surviving para of chc building or site brurc or dw is physically oc: chemically incompariblc.
Removing a rcsroruion period fcarurc of chc building or site t:Mc is unrepairable and not replacing Ir; or fu1ing; to document me new work.
Adding con)CCCUral landscape features to the sin: such a.s period reproduction lamps, fences, founr.iins, or vq;crarion that arc historically inappropriate, thw creating an inacamm: depiction of chc: n.:sroration pc1iod.
Restoration
Tht foU.wUff. Restoration worlt is hi'pli,lttcd ro i11diwt 1/,nt it inllfillll mt rrn»flltl or ttlrtmtion ,if o:istint hU/Orir buildint s1tt fat· tum 1IN1t would bt rtttrinrd in l'mn-1N1tion 111,d RdJ11bilit11tia11 trrt1t111(1tl1,· ttnd tht n1lllmncut of 11Ullint. l,,u/,din
fiitt ft11tu'ft:S f,,,m tbt ramrrtion pmod ,ain:tt1ll nc111 n111ttriA/s.
329
Setting (District/Ncighborhood)
&commt1ukd
Jdn,rif.,i111 rrtni11i11g, a11d pran-t1i111 ratoration period building 2nd land,capc bru,u of ,he setting. Sum fcaru,.. can indudc roads md sm:cu, furnishings such as lights or benches, vcgcr.uion, gnrdcns and yards, ;cljaccnt open space .ntch as 6dds, p:uiu, commons or woodlands, and impom.nt 'Views O< Yisuii rcbtionships,
N.c-cm.blishing chc relationship between buildings and land· SClpe brurcs of the setting that cxistt:d during the restoration period.
l'rt1t«ti11t autl 1111U11111li1U11 building marcrials and plant fua.Nrcs from the restoration period thtouGh appropriate deaning. rust rcmm,al, limited paint rcmm,al, :lnd n:appJica• rion or protcaivc coating syltcmS; and pruning and yq;cta• rion m:lnagcmcnt.
ProKCting buildincs and bndscape fc.arurcs ag.:ainst arson and vandiilism before restoration wodt begins by cn:crin; prottc• ti...c ftncing and installing alarm systems dtat arc keyed into local protection agencies.
Evalu:uing tltc existing ..:ondinon of the building and land· SClpe fca.turcs to determine whether morc than prorcction ;ind maintenance: arc rcquil"C'd, that is, if repairs to fc:irurcs willb<n=sary.
Reµiri111 restoration period b.turcs of the building and l:lndsapc by reinforcing the historic materials. Repair will ;cndy in dude d,c rcpba:mcnt in kind-or with c;ompari· blc Nbt:ritutc matcrw-of thost amuivdy dctcrionncd or missing pms of brurcs whctc there arc ,urvrYing prototypes such u porch b:ilustradcs or paving marcrials. The new work fflOuld be unobtnui'ldy dated to guide fucurc research and trc11mcnt.
Restoration
Not &comum,da/
Altering fa.Nrcs of the setting that an be doc:umcnted to the tatoration period.
Failing to properly document rcsror:uion period building and landscape fcaNn:s., which may rault in their loss.
Retaining non·rcstoration period buildings or landscape: fcaNrcs.
Failtng to provide adequate proccetion of matcri;ils on a q,:lical lnsis which it.SUlts in the deterioration of building and bndsnpe fuuuR:S.
Pcnnining the building and setting to remain unpcon:acd so rhat inrcrior 01 exterior btuca arc cbmagcd.
Stripping or removing features from buildings or the setting Nch as wood siding. iron fcncin;, terra coua balusrers, or plant macc:rial.
Failing to undcmkc adequate measures to as.sure chc protce· tion of building and landscape features.
Replacing an entire restoration period feature of the buildin; or landsc:ape setting when repair of materials and limited rcplaccmcnt of dcccrior.a.ttd or missing p.lrtS arc appropriarc.
Using a ,ubstiNtc material for rhe replacement part that docs not convey the visual appearance of the surviving para of the building ot bndscapc. ot th:lt is physically, chemically, or ecologically inmmpatiblc.
Restoration
Jl«otlfflMluJed
&plnci11t in kind an entire rcstor1.tion period feature of d,c bulding or landiapc: dm is roo dca:rior:m:d to rq><liwhcn the cwcrall form and dcailing; arc still cvidc:nc-usi
ns ,he physical evtdcnco a, a model [O ;uid< !fie new wo,k. If wing thc·samc kind of material is not rechnically or cconom� ically feasible. then a compatible subsrin.ite marcrial may be considered. The new wo.lt mould be unobuush,:ly da,cd ., guide fucurc rcscarch and treatment.
Not 1/m,n,mmd,d
Removing a rcst0ration period fcaNrc of the building ot landscape that is unrepairable and not rcpbcing ir; or failing to document chc new wont.
Tbt fo/Jowi11t &rtoration 111t1rlz is hizhlipltd to im.ittttt rhnt it J11uohla the rtm,ow,/ or tllrtmtion of aislillf.fottHm of the hiJ1r1ric littint rlMt ,,,.,JJ bt tt111intd in Pmniwtion and Hrhttbili111tio,1 r,un11mll; ,r,,d 11,e ,q,/A«,,unt of 111issiu,.iitttura from 1M mn,mtiou ,niMlllli11111U,iew111Atnittb.
330
r
Restoration
171r 8n,,rsfJJ--Mu/1,J£,nd Ho11NinP,,£,UM,Ft.ridt1.m. JUJ,;,J,,..,,(<)l,ef,,,•nd (/,)ttfin-t/x1ratln1rHI, 1v,t.,..,;.,,. O,rr 1hr yr,,n 1/1r _(fo,nrf,,)s;,/,,fti,, f/ltfflnAtl lw/ INtn ft/Im,.,, ,u ti ti:td,....,. Dt1rittttkmtr1m-1ion, UJU l111tr 1i,fi/J UNU rtnt9r/lM ,111tl ,1,, MJI wm1JM, ,.,_.,1,,...,;d,fuf/,,,n"I, llflin. ttntl fa1uMlnlio11, ,.,,.,,.. ,.,_, a,, ,f /W,1/&t,G,mm111ti1] Dtw'4pnunl Dq,,,r1111n11.
Restoration
Abho11g/, rlNworlr in ,l,cfo/JtJwUlf.st\'UOIU is quilt ofan.,, import1111tasp«to/ratonllionp1t1far.'U, iris usudU,11atJ14¥tofthtowr-11{/ proms ofprtsmd11:fow1m ftom dJt rrs1omtio11 ptriod {Jrottc�n. 1t1rbilizArion. comrnwtiott, "J)(Ur. a,14 "/lattm�nt); mthtr. J11ch 11,ork is ,usam/, for its pokntud lltflll'0
1Jt imp,cd on :IN b11i/Jinxi hisl4ri,: lf/pur,ttl«. For this rrdSOII, pt,rrimW CIV'r mUJI l,c urkm 11ot ro olnaur. t1lttr. or d,m1n.11 /timtm /10111 rl,� ratonuiou }'nod i11 dN plTJfflj of ,u1dtrtll/tiJ'f ,uork to mttt tP« 1111d nm-·
Mnsour:,IWoodlArrhit«tul'Ai MetJtls
lnstallinc thermal insuJuUm in atria and in unheated cdlars and mWUpaa:s a, incl'C3SC the efficiency of die aisring; mcc:hania.l systems.
Installing insulating material on the inside of muonry walls to inac.uc energy efficiency where chcn: is no interior molding a.round the windows or other U\ccrior archirc:ctural dcuiling from the restoration period.
Wi11dows
lhiliiing the inherent energy conserving fcarurca of a building by maintaining windows and louvered blinds from the rcstor.r tion period. in good apcrablc condition for narural vc:ntilarion.
lmpuwinc thcnnal efficiency wilh wcadaemripping, norm windows. caulking, Ulterior shades, and if'hutonally appropriate, Winds and awnings.
Inscalling interior sronn windows with air-tight gaskets. valri• taring holes. and/or removable dips to cruurc proper m:ainrcnana: and t0 avoid condcnnrion damage ro historic windows.
Installing: cxtcri.or stonn windows which do no, damage or ob<cwc the window, and !runes.
Applying thcnnal in1ularion with a high moisture conrcnt in wall caYir� wh.ch may cbmagc historic fabric.
lnsadling wall insulation without considering ia cffca. on in�or or other archittctUr.d dcta.ain;.
Using shading dc...ia:s daat arc inappropNtc to die rcsrorarion period
Replacing multi-paned s.wl from d,c n:sromcion period wiffl new thcrrnaJ sash uriJWng fahr munrins.
Insulting interior 1torm windows thar allow moisture to accumub«: and damage d1e window.
lnsca.llinc new cx«:rior nonn windows which arc lllappropriatc in siu: or tolor.
Replacing windows or tro.nsonu from the rcstom.ion period with fixtd thermal glazing or pcnnimng windows and mmsoms to remain srlopcnblc rather than urllo.ing dlCfl\ for their energy comcrving potential.
331
R«ommtndtd
JiJ1trn11cts and l'orchts
Maint:tining porclics and double vcttilmlc cntn1no:s from the rcnorntion period so th:u they can retain heat or block the sun und provide Ntunl vmtilatK>n.
I11terior Fcntllro
N.cr.,,ining interior s!1uttcn and transomJ from the restoration period for their inherent energy conscrving features.
M«IM1Ucttl Systnm
Improving energy efficiency of existing mechanica1 $)'Seems by in.nailing insufarion in auic.s :md basements.
B11ildh1g Sitt
Retaining plaru m:irerials, trtd, and landscape: bnn·cJ which perform p:usivc snlar energy function,, such as sun s:hading and wind brt2ks, if appropri:nc to the restoration period.
Sttti11t (DistricUN1ig/,borlJOM)
Maint.tining those existing landscape fcarurcs whid1 modctare the effects of rhe di mare on the setting such as deciduous trees, evergreen wind-blocks, and lakes or ponds, if appropriate ro the rc:sror.i.tion period.
Restoration
Changing porches significant to the n:srorarion period by cndosing them.
Removing inrerior fc-arurcs from rite rcstor.uion period that play a s:ea>n<b.()' energy eorucrving role.
Replacing o:ining mechanical systems that could be repaired fur continued. we.
Remo\l\ng plant mattria4, trees, 11.nd landsc-.lpr lt:arura from the restor;.tion period that perform pwivc solar eneri;y functions.
Stripping the setting of landscape fcarurcs and landforms from the restoration period so that effccu of the wind, rain, and sun result in accderared dca:rior:arion of the historic building.
0
Rc.<toration
Acassibility Comidcrations
Raomr,mu/td
Identifying spaces. brurt"S, :and finishes from the restoration period so that :accessibility codc-requin::d worlt will not result in rhcir damage or loss.
Complying with barrier-fro=: :access rcquiremenu in ruch a manner that spaces, farurcs. and finishes from the rcsrorarion period :arc prcscrvcd.
Working with local dis.ability groups, :ac.ccss specialists, and historic pn:scrv.arion spccialim to dcttnninc the m01t appropriarc solution ro acass problems.
Providing barrier-free -access th.at promotes independence far to the high.or dcgrcc practic:ablc, while preserving JiGnifitant historicfcarurcs.
Finding solutions ro meet aa:cuibility requirements that minimize rhc impaa on the historic building :and its Jitt:, such as compatible nmp,, paths, and lifa.
Undcrnkinc code-required �<entioru bcfo<e identifying those s:pacrs, fcarurcs, or finishes from the restoration period which mwt be pl"CS(NC(f.
Altering. damaging. or dc:nroying fcarun:s from du: n:sroration pcYOO m attt:mpring to comply with accessibility rcquin::rncnu.
M:aking changes to buildings without first scdc.ing expert advta: from accas spccialisa and l1isroric pn:scrnrionUO to determine solutions.
Makin; access modifications that do not provide a rcason:ablc balance between independent, nfc :acca.s and preservation of h isronc features.
Making modificationJ fur accasibility without considering die im� on the hisroric building and ia sire.
0 332
Health and Sali,ty Considerations
R«ommt1ukd
Identifying $paces, fa.tu res, and finlSha from the restoration period so d,ar codc--rcquirtd work will not rcsult in their dam:igc or loss.
Complying wid, hc.r.lth and Jaft:cy c::oda, including scismk: code rcquircmena, in such a manner that sp,ica:, fcacurc:s, and finishes rrum the n:noration period an: pn:scrvcd.
ltcmoving roxic building materials only afrc:r thorough ccsr\ng has bcc.n conducted and only o.ftcr less invasive abatement methods have been shown to be inadcqua.1t.
PfO'liding workc11 wirh appropriate pcnonal protective equipment for hax.ards found at the worluirc.
Working with local code ofrlCials to investigate sys«cms, methods, or dcvica of equivalent or superior dT,:aiYcncss and s:a.ft:ty ro those prescribed by code so char unnecessary altcn.tioN can be avoided.
lJpcrading hiatoric srairways and dcvat0a from the racoration period to meet health and nfcty coda in a manner that murcs their prcscrnrion, i.e., so that they arc not cbm.:igcd or obseurcd,
Inst.tiling sensitively designed fire supprasion systems, such as sprinkler systems, that rcsult in retention of katurcs and finishes from the restoration period.
Applying fin:-n:anbnt coatings. such ;as imumcsccnc paints. which expand during fire to add thermal protection to seed.
Adding a new stt1ilW':ly or dcv;nor tO meet he;ilch and J:lftcy codes in a manner thar pracrvcs o.djaa:nt features and ,paces &om the rcst0rarion period.
Restontion
Nor �111H1t1,da/
Undertaking codc-n:quirttl alterations to a building or site before identifying those spaces, fcatun::s, or finishes fn,m the restoration period which must be prcscn'Cd.
Altering. damaging. or dcsuoying spaces, fcarun:s, and finUhcs while making modific:itions to a building or sip: to comply with safety codC$..
Dctfroyin& interior features and finishes from the rcstonrion period without arcful resting and without coruid.cring las invasiwic abatement mcchods.
Removing unhealthful building materials without regard ,o peDOnal and cnvirunmenral safety.
Making changes to historic buildings without first exploring equivalent health and safcc:y systems, methods, or devices rhat may be las daml.£ing to spaces, fcarura, and finishes from the rator:uion period.
Damaging or obscuring staitways and elevators or alteringadjacent spaces from the rator.u:ion period in d-.c process of
doing work to meet code n:quin:mcna.
Covering wood features from the raroration period with fin:rcs\Stllnt sheathing which rauJrs in altering their visual :tppcarance.
Using fin:.-rt.tanbnt coarinp if they damage or obscure fcarun::r from the restoration period.
Alrains the appearance of spaces, features, or finishes &om the rcsrorarion period when addini; a new codc-n:quirttl stilirw:iy ordcvacor.
Standards for Reconstruction
& Guidelines for Reconstructing Historic Buildings
&nustn«tiou is drfi>1nl 1111k ttd or procm tf ,l�JHctmx, bJ mr,oa of11tu1 anomrction, dx forn,. fo,1um, ,m,I dmdlint ef t1 n.t1-1111'llnli,,i Uu, l,,ntfsc� j,Jil,liut, uma.11,r, ., obj«, far t1x purposr of rrplic,t1i111 iu 11ppmntncr "' 11 ,p«if,c pniM of tmw t11ul iH HI hisl,mc lea,1;011.
333
Standards for Reconstruction
1. Rcconsrruction will be wed to depict vanished or non-surviving ponion.s of 2 propcny when document.try and phy.sical evidence is 2wilaWe to permit accurate reconsttuction with minimal eonjccturt, 2nd such reconstruction is csscnrial to the public understanding of the propctty.
2. Reconstruction of a landsc:2pc, building, sm.icnu-c, or object in its historic location will be preceded by 2 thorough 2rchcological invcstiC3tion to identify ;md cval.u20: thwc b.rurcs and artif.acts which m men· ri:tl ro an 2ccur:uc rcoonsttuction. If such resources must be disturbed., mitigation measures will be under· r.t.kcn.
3. Rccon.snuction will incJUdc measures to preserve any remaining historic materials, b.turcs, and spacial rcl2cionships.
4. llcconsr:ruaion will be based on rhc accur.uc duplicuion of historic fcnurct and clements subsranri:ucd by documentary or ph)'$inl cvidcna: r.1thcr than on conjectural daign.s or the av.ail.bility of different ftarurcs from other historic propcnia. A reconstructed property will rc--crcarc the appc:ua.ncc of the non-surviving historic property in marcrials. design, color, 2nd fCXNrc.
5. A reconstruction wiU be cle2riy idcnti6cd .i.s 2 contempor:uy rc-emtion.
6. Dcsi&n.s tlm were nCY"Ct executed hi.storially will nor be constructed.
Guidelines for R.oonstructing Historic Buildings
Introduction
Whcl'C3S the trcarmc:nt Restoration provi� guidance on restoring-or rc-crcating-building fi:anucs, the Standards for Rt:iconstruct.ion and Guiddincs fot R<consuooing Historic Buildings address !hose aspects oftn:armmt nccasa.ry to n:.-ctQtt an entire non-surviving building wilh new material. Much like rcsronuion, the gexll is to make the building appc;a.r as
it did ar: a particula.r---4nd most .signi6cant-<imc in its history. The difference is, in Reconstruction. there '5 F.u- less extant h'5toric material prior to treatment and, in some c:asa, nodting visible. Bea.we of the: pcttntial for historicol cnur in me abscncc or sound physic:al evidence, this ttcatmcnt can be ju.sci6cd only ,ardy and, rhw, i, die lcasr ficqucndy undcrtaka,. Documenmion rcquircment1 prior to and following wodc. arc ¥Cry .rtringcnt. Measures should be taken ro prcsc:rvt extant historic surfao: and subsurface mattti• al. Finally, the ,ttonmua,cd building must be dearly idc:nrificd as a. contemporary re-creation.
In dJ< J!Jj()J ,m,otmcti011 of Ux I &h tmlll'7 C.WN1ori Alltr« •t Col.ni11I WillittfflWtu» Virfimtl, UH 11rchtJor.,c11I rrnu,ins of ,Ix britlt fa11nt1AIIO,, wrrr o,,efiJJ, pmm,tJ ill 1i111, 11,.J ,rrw m ti bttn for Ult rttr1tu1n1dm Ultllls. PIHta: nx Col.nktl Wi/Juu,ul,,� F.tmd,111011.
0 334
Ra.aN:h and Document Historical Sipilicance
Guidance for the treatment RcconmucUon begins with murrMui 11111/ docm1"1ui,,zlhc: building$ histonal s'&nificmcc ro uccnain lhar its n:-cn::ni>n is essential ro the public undcn:mndins: of the property. Olten, :inothcr cx�nt historic building on the fire or in a scning a.n ackquardy explain the property. rogcthcr with ocher inrcrpn:tiv.: aids. justifyini; a reconstruction miuin:s dc�ilcd physical and docu-mcnauy cvidencc ro minimize or diminarc conjecture :lnd ensure that the reconstruction &S as accurate :i.s possible. Only one period of signiflQr\a: is generally idcntiAcd. a building, as: it evolved, is ratdy rccrc:ucd. During this tmporrant f.u:t-findins .snagc:, if rcso.rch docs not: prOYidt adequate documentation for on accur:uc rcconmuaion, othc:r inccq,rctivc. methods should be consid.cftd, such as an cxpfa.natory m;irkcr.
Investigate Archcological Resources
/11J1al'tlfd11:archcologic:al l"CSO\ll'CC$ is fflC next :.trca of guidance in the na.tmcnt Reconstruction. The g� of physia.l rcscud, is ro identify bnucs of the building and .site which � cssc:ntW to an accu�tc tc· crcarion and must be rccorurmcrcd, while lcavins d1osc archcologial resources char arc nor csscnri:d, undisturbed. lnformarion duu is not rdcvant ro fflc: projccr ahould be ptcscrvcd in place for fuNrc rcso.rch. TI1e archcologica! findinp, rogcrher wiffl archival documcn�rion, arc then wed ro replica.re rhe pbn of the buildmg. together with the rdarionship 11nd ,W: of l'OOms, corridors, and ocher apaccs. and sp:uia.1 rdarionshif$,
Identify, Protect and Prcsc:n-c Extant Historic Fcatun:s
Oosdy aligned wirh :i.rchcological research, n:com-
mcndarions arc given fur idnui/Ji11r, proucti"f, Aud preso-ui11rr:xm.nr karurcs of rhc historic building. Jr U ncYCT appropN.rc to base a Reconstruction upon conjectural design, or the availability of diffi:rcnc bnircs from ocher buildinp. Thw, any rc�ing his-rorie mal'Cl'ials and fu.iturcs, such u rem nan a of a foundation or chimney and site fuuurcs such as a walkway or path, .should be rct.iincd, when practicable, :i.nd incorporated inco dte rccorutruction. The hiscoric as wdl as new material ahoufd be carefully documented co guide fururc research and cttanncnr.
Rcconstn1ct Non-Swviring Building and Site
After the rC5elrch and documentarion phases. guidance is given fur Rcc.ansuuction work iuclf. Exterior and interior kaNn::s arc add� in general, always cmphasiiing rhe need for an accurate IUpiai011, i.e., c:arcful duplicarion of the appc:.arancc of historic inte· rior paints, and finishes iuch as ncncilling. marbling. and grainin&, In the abscna: of atant hU.torie matt:• rials. the objccrivc in rcconstruerion is to rc-<n:are the appearance of rhc historic building fur inrcrprctivc purposes. Thw, while the we of traditional materials and finQhcs is always prckrtcd. in some iNtanas, ,ul»titurc m:arerials: may be wed if they arc able to convey the a:ame viw21 appearance.
When: non-visible fcarurcs of rhc bu�ding an: concerned-such as inrcrior .srrucrural sysrcms or mcchania.l systtffllo-it is apcacd dm conrcmpora.ry rna.rcrials and tcehnology will be employed.
R.c-crcaring the building i\fe should be an inrcgnl a.speer of projca work. The initial archcoJogia.l inventory of subsurf-acc and abOYCground rcmatr'li U wed :lS documentation ro rcconsrruct landscape rca.
narcs 1uch as walks and toads, fences, benches. -and fountains.
Energy l!tlicicnc:y/A=sibilityltkalth and Safety Code Comidentions
R«o,utn«tion 11111. Tmtt1Mnl. w,..,, • ronttmr""l Mpic-1ion is rrtpti,rd ,- "'"''""'""and;.,,,,.,., 4 r,.,,nfs hislaric ..,1,,. �tit< rr-<mttioll of llUlSi111to1npon,n11 i11 a I,;,.. taric dutrict or sik); when no othn-pn/llTJ wi'd, thr Mmf d»OCIIUiw UtlUJc lw mrviwd; 11nd whtn srtj/ia11t hisroricttl h�1urtio11 aim to nu,ut 1111 ttmurut rrprod11,tio11, R.«o1uJn«lion n") M to1uidatd ,u • '1'tttlmtnl. Prior Ill wukrtttkint work, • d«,a,,tu"1tio11 plA,, for Rtamstnldion sbo11Ub,d"""1p,J.
�-J,.JJtrHtM/g 6t Mm/.,, 1111 mmsiw11rr1Noloti&tl inwstiplio,,. 111111111 Mttr bm tr, IN'mllr" ,,.�,llnli•'i« amWUUll'J l,HilJi"tlll /wrt SN/fint.
335
Reconstruction
HNo111111t1ul«i
Reunrrhi11g aud d«11111e11ti11t dtc propcrtY's hisrorical signifi• cancc, focusing on the avaibbility of documentary and phys� ,cal cvi.dcna: nccdcd to justify nxonsnuction of rhc non-sut· viving building.
/11uatif11tu1i archcologic.il resources to idcntily and cvalua� those fumuu and arrifucu which arc ascnrial to the design and plan of chc building.
Not &co111111nllkd
Undertaking a ccconsrrucrion basal on insufficic:nt n:st"arCh, so that, ai a result, an historicaUy iruaccurarc building i.s crcaa:d.
H.ccon.nrucring a building unnecessarily when an a is ring building adequately n:Rccts or cxpl:Uns the history of rhc property. t� historical event, or has rhc same mociarivc value.
Exccuring a design for the buikling dur wu n�r consnuc.tcd hisroric:uly.
Failing t0 identify and evaluate archcological information prior to n:construaion, or destroying extant historical informuion nor rtlcvanr to the reconstruction bur which ,hould be p<acrv<d in place.
}t,m &11islr �"#rri Uklltmlor m,Jm,'t of Fort Snrlliwt, MinnMllt, in 1857. is ttatbtlim/J., p,ui,11, /nu tlw wm,/1 Wn11 don ,,., to1U11l11tt tfdNJ1mtttl«11nm11«11 nit/n,c, for II Rrn1u1r11c1i011. 0ml /1iUoriff lf'r IWtJ •urtlkt/N •11rm of d«Umfflllflion fa, 11n11u,c111.
Rlco111111r1ukd
Minimizing di.sNrbancc of tern.in co reduce rhc possibUi()' of dcsnoying ardicologial rc:soum,.
/Jn11ifji11i, retAi11ii11; ,uu/ pmen,i1ri cxr:un historic fcanuu of the building and site, such as n:mnanti of a foundation, chimney, ot walkW3.y.
.:-
Not &commnukd
introducing heavy machinay or equipment inco an:as where it may disturb an:hcologial """"""'·
Beginning; n:conmuaion work without first conducting; a dctaikd sitt invatigacion to ph)"ially substanriatc the documentary evidence.
Basinc a n:conmuaion on conjcccurul dcsic,ns oc the availabilicy of dilT=n< r..cun:, frvm o<hct historic buildi"!I',
(ii) ,11,d (h). Tw f>l-tot i/UUlmk 1k lot •f �1J1mtp.mry am1trt1ai•u IHIIJffltt/J ttntl 1«/111i1JIIO wid1i11 tbt tmrllllt!ll4 h1111rttrtio1L 8mmu R«o,utnK1it111 ii r111"'1Jt' t• ,.,,,., 11 #fllific•'*' Mnin' lir,c, ffU#lll]far iNrrpmiw /It� m"1tUl11r ,,.,,ni11'1 IIWJ W IIPJl'tl/ridlt if ll,q 1ut llblr,. un119 thr bisurit lllp,Mmllf't,
336
Reconstruction
Building Exterior
Rtt01tstruclr11ta non·n•rviving building to depict the docu· mcnttd historic appcan.ncc. Although mditional building m;1tcrials S\lch as masonry. wood. and architccnm.1 mer.ls arc pctfcrable, n1bstitute nurcM.ls may be used as k,nt as they re-create the historic-,11 ;1ppca.rancc.
Rc·crorint me documented design of c:ncrior f.c:uurcs such a.� the roof sh;1pc .and coverings; architectural detailing; win• dews; cntranca .and porcha: step:i: and doors; and rhcir historic sp:ai:1.I rclationshiP5 ;1nd proportions.
Rcptodueint the appc:1.rancc nf historic paint colors and finishes b.ucd on phy,ic:il :ind doc\lmcnt:lry evidence.
Using signs to identity the building as a contemporary re· crc::i.rion.
Building Interior
Hc-crc:uing the appcal"3ncc of visibl, katu� of the historical structural sy,ttm, rudt as p0$t and bc2m systems, ttus.SCS, summct boms, vig.u, cut iron columns, abO"IC·gr.iidc stone foundations, ot loadbcaring brick or stone walls. Subsrinnc rn:i,tct'n.ls may be used fot unexposed smictur;l fc.uurcs if they weft nor important to the histotic significance of the building.
Rc-crcaring :1 historic floor pbn or interior spaces, induding d� sir.c, eonf;gurarion, proporrion, and rclationship of rooms and corridori; the relationship of features to spaces; and the sp:\CCS thcmsdva.
Not R«ommmdtd
Rcconsrructing features that canner be documented histori· c:illy or for which inadequate documentation exists.
Using substituct materials that do not con,'C)' the appa.rancc of the historic building.
Omitting a documented exrcrior feature; or re-building a fea .. n1te, but altering its historic design.
Using inappropriate designs or marcrials that do not convey the h\Sroric appearance, such as aluminum storm and $Crctn window combinarions.
Using paint colors that cannot be documented through research and invcsrigarion to be appropriate ro the building or wing other undocumented hnUhcs.
failing ro explain that dtc building lS a reconstruction, thw confusing the public undcnt:anding.
Changing rhc documented appearance of visible fi:arurcs of the strucrunl sysrcm.
Alrcring the documented hi.storic Aoor plan or rdoating an important interior feature such as a sraircasc so that the historic rcbtionship bctwttn the fetrure :ind space is ituccura.tdy dcpicttd.
Raommtntkd
Duplicating the dowmcntcd historic appearance of the building's intcriot features and finishes, induding �umns, comio:.s, baseboards, fotplaccs and manrcls, pa.nclling, lighr fu:tura, hardware, and flooring; and wallpaper, plaster, paint and finishes sudl as stencilling. marbling and gr.aining; and other decorative mattrials mat accented inttrior fcatun5 and provided color, texture, and pactcming to walls. fl00f1 and ceilings.
Installing modtm mechanical sysrems in the lcur obrrwivc way possible, while meeting user need.
Installing the vertical runs of duca, pipes, and cables in closca. service rooms, and wall cavities.
Installing exterior clccttica.l and ttlephonc ables unckt· sround, or in the I cart obrrurivc way possible.
Rcconstniction
Not &tommnukd
Altering the documcnttd :appcarw.cc of interior futures and finishes so that. as a rcruft. an inaccuran: depiction of the hi.s• toric building; is crea.n:d. f"Or example, moving a feature from one area of a room n, anorhcr; or changing the type or color of the finish.
Alrcring the historic pbn or the re-created appearance unncc· cuarily when installing modem mechanical sy,rcms.
l rutalling verrical runs in ducB, pipes, and cabla in places where rhcy will intrude upon the hUroric ckpicnon of the building.
Attaching ottt.rior dtctric:al and telephone cables to the prin· eipal dcva.tions of d,e rcconmucttd building, unless their cxtstctlcc and visibility can be documented.
337
Reconstruction
Building Sito
Rm>mmmdcd
lSuing dccbions for reconstructing building site brurcs on che availabaicy of documcnt.1.ry and physical evidence.
Inventorying die building site ro determine the c:xis1cna: of aboveground remains and suWurfu:c archcologic::al man::riab. chcn wins; this evidence .u corroborating documcnt:1.rion for the rccorutrucrion of related sin: fu.Nn::s. ThCJC may indudc wolk,, paths, mods, and parking; n.a, shrubs, fidds or habaccow plane material; terracing. berms, or gr.uling; lis;hts. knees. or bcncllcs: sculprurc, st1.Naty, or monumenta. fountains, ma.ms, pools. ot lakcs.
ltc-csrablishing the his1orie relationship between the building or buildinp and historic sire fc;uurcs, whenever possible.
71w lf#'(IOHI pmdl ,r/ Midt/ln,m Pl,,«. nmr 01t1rlatM. S,,11dJ C,,,,,/ina. co,u1i1111t dw fint ltiNUUJ>td x,,mm ;,, Amnicrt. Tlw moldttl imnca. •ritiHttllJ cr,nsmtttul in 1hr J8JJJ rmU17' war /,,,irly rm,1llln1dtd i11 tlwtt1rl.,2lJtJ, «nN,ybmttl .n tr111n1trlllffi1t111ntl o1lwr JMUmfflllfrJ �it/ma. Pl111ta: Mitldlm,t Pllt«.
Not hco111111t11dd
ltcc:onsrruc1ing building sin: bwn:s without first conducting a detailed invcsrigacion ro physially subsanciatc chc documentary cvKlcncc.
Giving the building's sin: a false appearance by �ing the reconstruction or conjcaunJ designs or che availabilicy of ftarun::s from other nearby a:iccs.
Changing the his1oric spacial rclarionship bctwcc:n the buildU\g and liisroric sin:: f'carun::s, or n:consuuccing some sin: ftaNrcs, but not others, thw creating a false appcarincc.
Setting (Disrrict or Neighborhood)
Ra.sing dccisioru for reconstructing fcawn:s of chc building's ,,:itin& on rhc availability of documcncuy and physical cvidcna:.
Inventorying the Ktting to dcn::rminc ,he existence of aboveground n:mains and ,ub,uma: an:hcological nutrrial,, using chis evidence as corroborating documcnrarion for chc rccon· a:nuction of missing fuawrcs of the setting. Such fuarurcs could indudc mads and streets; furnishings 1Uc:h as lightt or benches. vegetation, l?rdcns and yards; adjaccnr open a:paice wen as fields. parlu, commons or woodlands; and important views or visual rclationa:hips.
Re-establishing the historic spatial rdarionship bct'Weffl buildings and land.ape bn,n:, of rhc =log,
R.tconruucti.on
Rcconsrrucrina; fuarurcs of the setting wichout firn conducting• dcuilcd in..,,;g.rivn 10 p�ysically submnriarc rhc documentary evidence.
Giving the building's setting a f.Jsc appcarincc by basing me reconstruction on conjccrural designs or the availability of fuaturcs from other nearby districa or ncighborhooch.
Confusing !he historic spari>l n:l.rionship bcrw,,:n buildings and. landscape bturcs within the Ktting by rcconsuuaing some missins; dcmcaa, but not others.
(II) 11nd {I,). Tw llifttll of1Jw Officm' Q1111rtm 111 /iJrt Slldlint (ell. 1885 ,. /!}(JO) u.t onf ,,.,,,;* infom111ti1111 ou 1/. tn111tnlfls 11ndfonn •flk J,uum /,J«lt, UN] tl«IUllffll tbt ltlOIIMtl 1111JJ11u1111 ,,,,J ·"'" ,,,,,.,,/JI ,/Mlum ,ud, IU ,t,u·n,. ,.,,w,. """ t,rt pl«:tmnu. Haloric,,I ,,,.. Jict,ri,,I nitlnitr WtNJtl ntttf t• bt ,-n,bi,J«I wi1/1 JfWtific /bJ,iul nlitlmrr ;,, •tdtr,. ,,,,,!,-tlw CflU for &m,utruct;.11 Ill II lmrt1t1ml.
338
Reconstruction
n/lt 1778 Km/111,a 11,MN. wl,id, lffWrf IU Bniill, HnfN/Ulfrun tl,iri11t the &.J,,,, .. ,..,, Wfrr. ,.,. l,Hmtd"' u,.;.,, ,,.,, in 1865. In dx trtrl] /970,, tlH' /.,.,m 11/lttJ rrr.1uln,d,,/ ,u f"" .f C,,mdrn &111/efiJ,I, C,mdrn, S#11UJ c,,..h·,.,,, /Jm'/J rxpmsl] far in1n1rniw p11rposa, ii mw:, ,u "" j//JuJrnlil/lt rt111i1,d" of tt JI"" rwNI ef11t1Jitmtt/s,"p,ifinmtt. nN St4ndt,n/J for R«MJtn«lion ett/J for 1111) IN1Mkfl /J11iUi,,g,. • tlrrulJ itlrmifirtl ,u ti rt1111nn,-m,y drfit1i,11. Tllb is nlOJt ,f,m tlonr bJ IHMIII of tt11 atrri•r u"p or JHl'q11r, or Um,1tfl, "" r.cp�nt1I01] brodmrr tit rx/1ibi1. A timlr ''"'' i1,fann ubilon dJ wdl Phdlo: Ri,J,,,,r( Ftntr.
0
Reconstruction
Whm-a-1 pratr11t1.tio11, rrhabilirariou, 41,J ratonuio11 trtdb1Jt11U wua/J, 11tta1itate rrtrofinint llJ m«t t«1e and tnnx, req11irt11ttn/J, itt d,U trtdhJWHI it is tUIWnd dltf, MN mvHlltll<Ud 6ni/Ji1tt will/,, Nll!utudlJ 11tu1 (Ollltntaio11. '111us, 0111] mini111nl grlidAntt U prouidal in tlK fol/o,uing s«tion, ,Jd,ou:h the ,writ m,ut sti/1 bt tUSalM for ilt pou11tit1I nttttliw i�npact 011 tht m:ans1rudtd
Rtto111111t11dhl
lnsr.llling thermal iiuulation, where approprian:. as part of the reconstruction.
Urilaing the inhc:m1t energy CONCC'V\ng fcnura, of windows and blinds. porches and double vestibule entranw: in a n:consnuaion project
Utilizing plant m.ucrials, trees, and Ian� features, cspc· cia.lly th<* whid, perform passive solar energy functions such a& sun �ng and wind breaks,. when appropriate to the rcconsttuct1on.
A=ssibili<y Coruickntions
Taking accessibility rcquircrncna into considcnrion early in the planning stage so diat barricr.ficc a«cs$ can be provided in a way that U compuiblc with the n:construction.
Health and Safuy Considentions
Considering health and sakty code rcquircmcna. such :11 dte mmlbrion of fin: suppn:ssion systems, wly in th< planning stage of d,c project A) that the work is compariblc with the n:constnicrion.
Installing thermal UUUlarion with a high moisrun:. content.
Using windows and shading devices dlar llrC inappropriate to rhe n:conmucrion.
Installing new thermal sash wttl1 false muntins instead of wing sash th;,t is appropriatc to dlC n:con.struccion.
Removing plant materials and lundscapc lcatun:s which per· form passive energy functiona: if mer nre appropriate to chc n:constniaion.
Obscuring or d;unaging rhc ;appearance of ffie rcconsa-uctcd buildi:ng in the procas of providing barrier·lm: accw.
Mccring hc:ilth and Mey rcquiremena widtout considering thc:\l' visual impact on the rcconsnuaion.
339
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Liberty Fest
BACKGROUND: This item has been placed on the agenda at the request of Mayor Pro Tem Seiler.
a. Continue selling beerb. Increase City budget for eventc. Lower costsd. Location of event
340
Liberty Fest 2017 Review and Recommendations
Site:
• Begin discussions with Alex Tyberg (immediately to the north of ACC) to secure his site for 2018• If Tyberg is not available, discuss and secure same ACC site for 2018
Festival Time:
• Open gates around 2:30 or 3 p.m. instead of 4:30 p.m.
Fireworks:
• Music hard to hear during show (Synchronization)• Show was 25-26 minutes – scheduled for 21. Partially due to company bringing additional shells
unused from other events and somewhat slower start• Start fireworks at 9:15 p.m. not 9:00 p.m.• Started a little slow/gaps in between bursts but after 4-5 minutes it picked up and really went
from that point. Start with a big opening burst• Decrease amount of low level shells due to location – can add higher shells, which can be
accomplished with reduction in length of show• We will need to go back out for RFQ to secure fireworks company in October 2017
Vendors:
• Vendors seemed very pleased. Lots of positives• Drawback was many vendors showed up late (after 3 p.m.) which created some logistic and
vehicle headaches. But we will work to alleviate that for next year
Concerts:
• Keep same amount of budgeted dollars (up to $35,000), however, have more local and regionalbands, rather than national act. Instead of opening band and headliner, have 3-4 opening bandsto play a forty-five to hour set and main act at 90 min. (has to come on by 7:45 p.m.) and thenfollow with Regional band from 9:30 – 10:30 p.m. and close festival
Master of Ceremonies:
• Utilize radio personality or person with comedic talent in between bands, make continuousannouncements/introductions, and refer to sponsors and/or various vendors throughout day
Beer:
• Beer Company was pleased and would love to do it again. Need to be involved earlier and theycan assist with getting sponsorships of $5,000 - $10,000. They sold nearly $29,000 ofbeer/product. City made a little over $5,100. Next year to add Sangria and/or wine-basedmargaritas. Liquor is hard to do because of the tax rate at 14%
• Move ID/Wristband area closer to the beer sales tents, rather than the main gates.• Better cooler checks at gate is needed• LPD/Security Company to do more checks in festival attendees
341
• According to most, the number of complaints related to intoxicated festival attendees was down
Fun Zone:
• Awesome! Majority of parents really enjoyed the $10 wristbands. Sold 746 bands and only 2complaints about the cost
• Need more non-profits to assist with inflatable oversight
Port-a-potties/Trash:
• Not enough! Only 36 were able to be secured through ACDI. They tried to obtain more. Wewill need to budget for additional above what can be donated. We need at least 50 more, 80-100 is necessary
• Need more sanitizing stations as well• Nice compliments about the cleanliness throughout the evening. John with P&R did a great job
all night long• Trash cans and recycled boxes were not in the crowd at the beginning. Once we moved them,
trash was deposited regularly• Need volunteers or volunteer groups to assist with cleanup the following day
Parking:
• Overall traffic plan worked really well• PW did a fantastic job of laying out the parking site and installing the pedestrian bridge/walkway• Great getting people in, but difficult getting vehicles out in timely manner. Needed additional
exits and review traffic control at the intersections/traffic lights. Plus there was an accident thatdelayed vehicles
• Move ADA to different location. Rather than long, make it closer to entrances• Cap Metro Buses worked well, once they figured out their route
Canopy Area:
• People who brought canopies were very pleased overall. However, needed much larger areawith better signage and walk lanes (Grids) throughout
Budget:
• Additional Security (Security Company) may be needed• Additional Port-a-potties• Additional tents at entrances (rental)• Cover supplies from other Departments• Additional signage and updated signage is needed• Continue to increase sponsorships
City Services:
• Incredible participation and buy-in from Departments. Downside - a lot of City staff are givingup a Holiday for the benefit of others
• Command Center operated very efficiently and effectively
342
New items for 2018:
• Additional teen type activities – Tethered Hot-Air balloon rides; Water feature inflatable• Misting area(s)• Mechanical Bull• Corn hole or Washer Tournament• Zombie Laser Tag• Nerf Archery• Kettle Corn Vendor• Event Maps and Information Kiosks under shade umbrellas• More volunteers to answer questions
343
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Schedule next Retreat (January) and Joint Work Session with the Planning &Zoning Commission
BACKGROUND: This item will provide the City Council an opportunity to discuss and schedule the January Retreat as well as the joint work session with the Planning & Zoning Commission.
PREPARED BY: Dara Crabtree, City Secretary
344
1 7/19/2017 2:04 PMDara Crabtree
Su Mo Tu We Th Fr Sa1 2 3 4 5 6
7 8 9 10 11 12 1314 15 16 17 18 19 2021 22 23 24 25 26 2728 29 30 31
January 2018Su Mo Tu We Th Fr Sa
1 2 34 5 6 7 8 9 10
11 12 13 14 15 16 1718 19 20 21 22 23 2425 26 27 28
February 2018
January 2018D
ec 3
1 -
Jan
6
Dec 31 Jan 1, 18 2 3 4 5 67:00pm Council
Regular Meeting
Jan
7 -
13
7 8 9 10 11 12 136:30pm Public Arts
Commission7:00pm P&Z Meeting
Jan
14 -
20
14 15 16 17 18 19 20 BCRUA 7:00pm Council
Regular Meeting
Jan
21 -
27
21 22 23 24 25 26 277:00pm P&Z Meeting
Jan
28 -
Feb
3
28 29 30 31 Feb 1 2 3
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
345
1 7/19/2017 2:05 PMDara Crabtree
Su Mo Tu We Th Fr Sa1 2 3
4 5 6 7 8 9 1011 12 13 14 15 16 1718 19 20 21 22 23 2425 26 27 28
February 2018Su Mo Tu We Th Fr Sa
1 2 34 5 6 7 8 9 10
11 12 13 14 15 16 1718 19 20 21 22 23 2425 26 27 28 29 30 31
March 2018
February 2018Ja
n 28
- F
eb 3
Jan 28 29 30 31 Feb 1 2 37:00pm Council
Regular Meeting
Feb
4 -
10
4 5 6 7 8 9 107:00pm P&Z Meeting
Feb
11 -
17
11 12 13 14 15 16 176:30pm Public Arts
Commission7:00pm Council
Regular Meeting
Feb
18 -
24
18 19 20 21 22 23 24 BCRUA 7:00pm P&Z Meeting
Feb
25 -
Mar
3
25 26 27 28 Mar 1 2 3
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
346
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: Council Goals
BACKGROUND: At the July 2016 Retreat, the City Council discussed the issues that were important to the City and developed a priority list. Short and Long Term Goals were also discussed. This item will provide the Council with an opportunity to review the list and make changes or updates, if so desired.
ATTACHMENTS: 1. Issues Important to City Council/Staff2. Short Term and Long Term Goals set July 30, 2016
PREPARED BY: Dara Crabtree, City Secretary
347
ISSUES IMPORTANT TO COUNCIL/ STAFF discussed at July 30, 2016 Council Retreat
Create Life
• Create Downtown• TOD / Town Center• Parks / Community Center• Senior Center• Connectivity (before ACC opens)• Public Safety- Continuation of Responder Safety
Public Safety
• Connectivity (2-3 years)• Hero Way (possible 1431 to IH 35) (Nameless Road)• Infrastructure• Continuation of Responder Safety
Economic Development Ordinance
• More Public Space• Recruit Quality Developers / Employers• Retail – Raise the Bar• Business Ready Sites• Tax Rate
Personnel
• Increase Staff Resources• Recruit / Retain quality employees• Increase competitiveness in compensation package
Communication
• Public Information Officer• Updates from all Committees/Boards twice yearly
Other
• Grow Parks System• More Community Events• Address growing and changing Public Safety needs• Continue “Destination Leander”• Address social changes in the community
348
COUNCIL RETREAT – July 30, 2016
Short Term Goals – 1 to 3 years
1) ACC – connectivity with from the Cap Metro Sitea) Metro Driveb) Brushy Creek Trailc) East Street
2) Town Center / Old Town / Eventsa) Brushy Street Projectb) Renovation of Fire Station/Pat Bryson
3) Economic Developmenta) Addition of TIRZ #2b) Old Town Incentivec) St. David’s Hospital Incentive packaged) Addition of Public Information Officer (PIO)e) Continue Development with Cap Metro sitef) Increase Public Use of Golf Course
4) Senior Center5) Bond Projects
a) Metro Drive Extensionb) Raider Way Roadway Improvementsc) North Brushy Street Streetscaped) Lakewood Community Parke) Parkland Acquisitionf) Bledsoe Park Synthetic Turf Fieldsg) Veterans Parkh) East Crystal Falls Parkway Median Landscapingi) Mason Creek Trail
Long Term Goals – 3 + years
1) Public Safety – Information Technology (IT)2) Town Center – Connecting with the TOD
a) East Streetb) Hwy. 183 Pedestrian Crossing
3) Trails / Parks (2nd Bond Issue List)a) Lakewood Community Parkb) Brushy Creek Trail (Hero Way Spur)c) San Gabriel Park
4) TOD Developmenta) Recreation Center
5) Bond Issuance6) Transportation / Roads
a) 2243 Realignmentb) San Gabriel Parkway
7) Continue Connectivity throughout City8) Continuance of Roadway Maintenance Plan
349
EXECUTIVE SUMMARY
07/22-23/2017
RETREAT AGENDA SUBJECT: City Manager Evaluation Criteria
ATTACHMENTS: 1. City Manager Job Description2. Sample Supervisor Review3. City Council Evaluation Items4. Sample Evaluation 15. Sample Evaluation 26. Sample Evaluation 37. Sample Evaluation 48. Sample Evaluation 59. Sample Evaluation 610. Sample Evaluation 7
350
Job Title: City Manager Job Number: Contract Department: Administration FLSA Category: Range: Contract Approved Date: 7/1/13 ________________________________________ Summary: Oversees the planning, coordinating, and directing of departments for the City of Leander, enforces the city policies and procedures applicable to span of control, oversees the city budget and personnel. Works closely with the city council, all departments, and multiple public and private entities in developing a vision for the city, implementing the strategy, and evaluating the outcomes.
Organizational Relationships: Reports to: City Council Other: Has frequent contact with other city employees, other departments, other governmental agencies local and state levels, public and private organizations, the general public, and professional associations.
Essential Duties and Responsibilities include the following. Other duties may be assigned. • The city manager shall be the chief executive and administrative officer of the city and shall be
responsible to the council for the proper administration of all the affairs and business of the city.• Enforce all state laws and city ordinances.• Appoint, suspend or remove any officer or employee of the city, except those officers appointed
by the council and as otherwise specifically provided in the charter.• Plan, organize and define the organization of City Administration to ensure a coordinated and
efficient effort to meet the goals and objectives established by the Council, and various Boardsand Commissions.
• Plan, develop and implement administrative policies, rules, regulations, and procedures.• Coordinate the administration of all Departments and Boards and Commissions.• Direct all personnel matters as provided by the Personnel Policies of the City.• Develop and issue administrative rules, policies, and procedures necessary to ensure proper
functioning of all Departments.• Prepare and submit an annual budget to the Council; obtain input from Department Heads; and
keep Council informed of the financial condition of the City and recommend action asappropriate.
• Attend and participate in all Council meetings and other meetings with official bodies asdirected by the Council; ensure that all laws and ordinances are enforced; direct the preparationof the agendas, review meeting minutes; prepare resolutions and ordinances for the Council andcarry out Council directives.
351
• Attend and participate in all special appointed meetings; prepare policies and makerecommendation for Council approval; carry out Council directives.
• Attend other Board meetings as necessary.• Prepare or oversee preparation of grant and/or loan applications; administer grant and/or loan
money that is received, and prepare related reports.• Represent the City with other governmental agencies and officials.• Monitor operations to ensure compliance with applicable laws, regulations, rules, policies and
ordinances.• Develop long and short-range goals and oversee their implementation.• Evaluate potential projects, programs and services to determine feasibility and community
impact and make recommendations to the Council.• Keep the council advised of the financial condition and needs of the city and make such
recommendations as seem desirable.• Prepare and submit to the council at the end of each fiscal year, a complete report on the
finances and administrative activities of the city for such preceding fiscal year.• Make such other reports as the council may require concerning the operations of the city.• Meet, discuss and confer with and advise the mayor and or any member of the city council
regarding the business of the city.• Perform such other duties as may be prescribed in the charter or required by the council.
Marginal Duties and Responsibilities include the following. Other duties may be assigned. • None.
Supervisory Responsibilities: Is responsible for the overall direction, coordination, and evaluation of a department or function. Carries out supervisory responsibilities in accordance with the organization's policies and applicable laws. Responsible for supervising subordinate supervisors and direct reports including interviewing, hiring, and training employees; planning, assigning, and directing work; appraising performance; rewarding and disciplining employees; addressing complaints and resolving problems.
Required Education and/or Experience: Doctoral degree (Ph. D.) or equivalent; or more than 10 years related experience and/or training; or equivalent combination of education and experience.
Preferred Education and/or Experience: None.
Certificates, Licenses, Registrations: None.
Core Competencies: Customer Service: Displays courtesy and sensitivity. Manages difficult or emotional customer situations. Meets commitments. Responds promptly to customer needs. Solicits customer feedback to improve service.
Dependability: Responds to requests for service and assistance. Follows instructions, responds to management direction. Takes responsibility for own actions. Commits to doing the best job possible.
352
Keeps commitments. Meets attendance and punctuality guidelines.
Job Knowledge: Competent in required job skills and knowledge. Exhibits ability to learn and apply new skills. Keeps abreast of current developments. Requires minimal supervision. Displays understanding of how job relates to others. Uses resources effectively.
Quality: Demonstrates accuracy and thoroughness. Displays commitment to excellence. Looks for ways to improve and promote quality. Applies feedback to improve performance. Monitors own work to ensure quality.
Teamwork: Balances team and individual responsibilities. Exhibits objectivity and openness to others' views. Gives and welcomes feedback. Contributes to building a positive team spirit. Puts success of team above own interests.
Management Competencies: Leadership: Exhibits confidence in self and others. Inspires respect and trust. Reacts well under pressure. Shows courage to take action. Motivates others to perform well.
Managing People: Provides direction and gains compliance. Includes subordinates in planning. Takes responsibility for subordinates' activities. Makes self available to subordinates. Provides regular performance feedback. Develops subordinates' skills and encourages growth.
Specialized Competencies: Cooperation: Establishes and maintains effective relations. Exhibits tact and consideration. Displays positive outlook and pleasant manner. Offers assistance and support to co-workers. Works cooperatively in group situations. Works actively to resolve conflicts.
Planning and Organization: Prioritizes and plans work activities. Uses time efficiently. Plans for additional resources. Integrates changes smoothly. Sets goals and objectives. Works in an organized manner.
Problem Solving: Identifies problems in a timely manner. Gathers and analyzes information skillfully. Develops alternative solutions. Resolves problems in early stages. Works well in group problem solving situations.
Knowledge, Skills, and Abilities: Must have knowledge of state, criminal, administrative, constitutional and municipal laws and ordinances and their application. Ability to serve as judge and establish and maintain effective public relations and to analyze and apply legal principles and precedents to local governmental problems.
Ability to read, analyze, and interpret plans and specifications, contracts, ordinances, technical journals, financial reports, and legal documents. Ability to prepare contracts, ordinances, resolutions, policies, reports and correspondence. Ability to present reports and make recommendations to Council, Utilities Commission and other Boards and Commissions. Ability to communicate effectively both orally and in writing with elected and appointed officials, staff, other public officials, volunteer departments, and the general public. Ability to make arithmetic computations using whole numbers, fractions and decimals. Ability to compute rates, ratios and percentages. Ability to understand governmental accounting standards and accounting standards for enterprise funds. Ability to oversee budget preparation and
353
administer the budget. Ability to analyze and make recommendation on utility rates for Electric, Water and Wastewater Departments. Ability to apply principles of logical thinking to a wide range of intellectual and practical problems. Ability to deal with nonverbal symbolism (formulas, scientific equations, graphs, etc.) in its most difficult phases. Ability to deal with a variety of abstract and concrete variables. Considerable knowledge of laws, regulations, ordinances, etc., applicable to City government. Considerable knowledge of budgeting, accounting, and government financing. Considerable knowledge of government processes, services, and planning. Considerable knowledge of management principles and practices as they apply to public sector management including personnel management and organization development. Considerable ability to plan and analyze City operations; develop alternatives and determine the costs, advantages and disadvantages of various alternatives. Considerable ability to research and prepare accurate and thorough reports. Strong communication skills. Strong organizational skills.
As set forth in the City Charter, Section 7.01 – The council shall appoint and may remove the city manager upon the affirmative vote of four members of the council, and shall supervise the city manager by majority vote. The city manager shall be chosen and compensated solely on the basis of his or her experience, education, training, ability and performance, and need not when appointed be a resident of the City; provided that, during his or her tenure of office, the city manager shall reside within the City. The city manager may be bonded at city expense as determined by the council, and may require a bond be provided at city expense by any other employee. No member of the council shall, during the term of office for which he or she is elected, or for one (1) year thereafter, be appointed city manager.
Equipment, Machines, Tools and Work Aids: Computers, office machines, photocopier, audio visual equipment, teleconference equipment.
Physical Demands: While performing the duties of this job, the employee is regularly required to stand; walk; sit; use hands to finger, handle, or feel; reach with hands and arms; climb or balance; stoop, kneel, crouch, or crawl; talk or hear and taste or smell. Specific vision abilities required by this job include close vision, distance vision, color vision, peripheral vision, depth perception and ability to adjust focus.
The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
Working Environment: The noise level in the work environment is usually quiet to moderate.
The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.
Signature/Approval:
__________________________________________ ______________________ Employee Date
354
__________________________________________ ______________________ Supervisor Date __________________________________________ ______________________ Department Head Date
The above statements are intended to describe the general nature and level of work being performed by individuals assigned to this job. They are not intended to be an exhaustive list of all responsibilities, duties, and skills required of personnel so classified in this position.
355
'-'llY or Leanaer
Performance Review
Overall Appraiser Rating:
0.00 - Not Rated
1::mp1oyee 1mormat1on:
Employee Name
Job Title
Review Period Start
Review Period End
Appraiser Name
Appraiser Title
Organization Name
Hating �cores:
Appraiser Review
Description Rating
Unsatisfactory 1
Needs Improvement 2 -···-··-- -
Meets Job Requirements 3
Exceeds Job Requirements 4
Outstanding 5
Joo uuttes:
Weight:
40%
Appraiser Rating:
0- Not Rated
Job Duty Description:
Please refer to your job duties as defined on your job description.
. PertonnSmart Performance Review
356
Comments:
Appraiser: No comments entered
r1e11ormance Gornpetenctes:
Weight:
60%
Overall Appraiser Rating:
0.00 - Not Rated
» Customer Service - 14%
Displays courtesy and sensitivity..... -- ·-·-----
Manages difficult or emotional customer situations
Meets commitments
Responds promptly to customer needs
Appraiser Review
0.00 - Not Rated
-------------
So Ii cits customer feedback to improve service
Comments:
Appraiser: No comments entered
» Dependability - 14% 0.00 - Not Rated
Comm its to doing the best job possible- -..... ............ ·-·-· ··-·· ··--------------
Follows instructions, responds to management direction
Keeps comm itrn ents
Meets attendance and ptmctuality guidelines
Responds to requests for service and assistance ·-····-·· ······· · ···-· ·
Takes responsibility for own actions
Comments:
Appraiser: No comments entered
» Job Knowledge - 14%
Competent in required job skills and knowledge
Displays understanding of how job relates to others
Exhibits ability to learn and apply new skills
Keeps abreast of current developments
Requires minimal supervision
Uses resources effectively
Comments:
Appraiser: No comments entered
» Leadership - 15%
Exhibits confidence in self and others
Inspires respect and trust
Motivates others to perform well
0.00 - Not Rated
0.00 - Not Rated
. PerfonnSmart Performance Review
357
Reacts well under pressure
Shows courage to take action
Comments:
Appraiser: No comments entered
Appraiser Review
» Managing People - 15% 0.00 - Not Rated
Develops subordinates' skills and encourages growth-- --- ------ --- . ---
Includes subordinates in planning
Makes self available to subordinates
Provides directi on and gains compliance
Provides regular performance feedback
Takes responsibility for subordinates' activities
Comments:
Appraiser: No comments entered
» Quality -14%
Applies feedback to improve performance
Demonstrates accuracy and thoroughness
Displays commitment to excellence
Looks for ways to improve and promote quality
Monitors own work to ensure quality
Comments:
Appraiser: No comments entered
» Teamwork - 14%
Balances team and individual responsibilities
Contributes to bltilding a positive team spirit
Exhib its objectivity and openness to others' views
Gives and welcomes feedback
Puts success of team above own interests
Comments:
Appraiser: No comments entered
ueve1opment 1-'lan:
Coaching Ideas:
No comments entered
Comments:
Appraiser: No comments entered
0.00 - Not Rated
0.00 - Not Rated
PerformSmart Performance Review
358
r utu re Goa1s:
No future goals entered
t:Jummary:
Overall Appraiser Rating for Review:
0.00
Comments:
Appraiser: No comments entered
1-<ev1ew :signatures:
Appraiser Review
By signing this review form does not necessarily mean that i' agree wit.h the contents of the review, but I have
received a copy of the pet1ormance appraisal document.
Employee Printed Name
Employee Signature
Employee Signed Date
Endorser Printed Name
Endorser Signature
Reviewer Printed l\lame
Reviewer Signature
Reviewer Signed Date
Endorser Si-gned Date
PerformSmart Performance Review
359
Follow guidelines and directives regarding long and short term goals set by Council for the year (Quantitative)
Responds to Council’s requests and disseminates complete and accurate information to Council in a prompt, thorough and transparent manner
Knowledgeable of City Ordinances and legislative changes effecting the City; shares updates with Council accordingly
Knowledgeable of financial condition of the City, revenue and expenses
Plans, prepares and administers the adopted budget; identifying present and future needs
Represents the City in a professional, articulate manner at public, private and media events
Communicates professionally and effectively with leaders from other cities, staying engaged and fostering healthy relationships
Community outreach; effective interaction with citizens, staff relations; and public image all play a factor (Qualitative)
Through discussions with Department Directors, City manager fosters effective leadership; agrees to a least one high priority goal with each Department Director for upcoming year (result of discussions between CM and Directors)
Pick a specific issue on which to focus (Special Projects)
Fulfills role effectively
City is efficient in all ways
360
A Manager's Performance Appraisal: Prepare With Confidence I icma.org
• A method to evaluate the progress and success of the manager.
Mission and vision. Defining who you are, what you believe, and where you are going-all rudiments of an
effective strategic plan-is crucial. In one Vermont tourist community, administrators view their town as a business
that is dependent on tourism and marketing to visitors, while still focusing on primary and secondary homeowners.
Elected officials always make decisions with an eye on this mission, keeping them focused and forward thinking.
Managers and officials must regularly discuss their mission, vision, and strategy, while defining values that they
believe, and from which they operate and conduct business. When mired in constant crisis or reacting to the day
to-day issues, communities can sacrifice their future and the opportunities this future presents.
Goal setting. The goal-setting process can be the most dynamic and harmonizing event that managers and
governing boards experience. Many communities do it annually, while others do it after each new board is seated.
Here, the board can establish clear expectations and accountability standards for the manager, ensuring that he or
she is aligned with the board's interests. Done well, this becomes a vibrant, proactive experience. Without it, people
could find themselves sailing on a rudderless ship, destined for disaster.
Clarity of roles. Local governments work best when there is only one manager. Yet too often, councilmembers get
confused about their role and think they, too, are the manager. Like the two-headed monsters of Greek mythology,
they find themselves moving in different directions. It doesn't work.
Good governance makes good government. One town manager quotes Plato when he discusses governance
during board orientations. "To do one's own business and not to be a busybody is justice," which basically means
justice is found in fulfilling your own role while not overstepping it.
Taking the time to define roles and adhering to them minimizes problems in the future and is essential to
meaningful appraisals.
Positive working relations. I regularly tell people who I work with that results can only occur if there are three elements in place: 1) a positive working relationship between the board and the manager; 2) a shared mission
about what the locality is and what the locality wants to accomplish; and 3) a commitment to move forward
together in a collegial manner.
With that foundation, communities can progress. But absent any one element, things come tumbling down.
Relationships based on trust, respect, and confidence are essential.
Governing and managing are all about the relationship. Managers must know that they have the backing of the
elected officials and vice versa.
Evaluation process. Putting in place a progressive process to evaluate the manager allows for healthy discussion;
clarification of expectations; refocus of direction, if needed; and open communication. No business relationship can occur without accountability standards, and this is the power of the appraisal process.
WHAT MAKES A GOOD EVALUATION PROCESS?
Agreement on the process. Ideally, the governing board and the manager should come together to decide how
to do this, when it should be done, and on what basis the manager will be evaluated.
While many shy away from evaluations, one Connecticut manager built the process into his contract to ensure he
had open communication with "his new bosses," to understand their viewpoints, and to make sure he was in sync
with each of them.
When I have developed appraisals with managers and governing officials, I have found that simply discussing the
process opens lines of communication, breaks down barriers, and often leads to discovering emerging new areas
of communality.
More than a form. Good evaluations are simply conversations, not forms. In fact, the forms are often a distraction
from what is truly important. A frank open dialogue, with all individuals participating, is much better then including
a five-point Likert scale and boxes to check on a form.
Forms are good for clarity and recordkeeping. They make the human resources professionals and lawyers happy, but they can never replace the feedback received during the appraisal interview. Good evaluations occur when
people are talking and listening with each other, not when forms are written, read, signed, and forgotten in a file.
http:/ /icma.org/en/press/pm _ magazine/article/106284 1/4/2017 362
A Manager's Performance Appraisal: Prepare With Confidence I icma.org
Manager self-evaluations. Managers should take time to both critically evaluate their own performance and that
of their organizations. Elected officials readily admit that they do not know what managers do each day-and why
should they?
It is not their responsibility to monitor everything the manager does. Managers should, however, communicate
what they have done and more importantly, what they have accomplished during the period.
After all, they were hired and are being paid for accomplishments, not activities or simply showing up. A pinch of
selfless self-promotion is also a good thing.
Review of goals. As noted earlier, this is an ideal time to review progress on the manager's goals and objectives. It
is also a period when new goals can be established. Goal setting is the heart of the appraisal process.
In one Connecticut town, every two years, the board, the manager, and the department heads get together for a
formal goal-setting session. They incorporate a three-step process that includes:
• Identifying the overarching issues facing the town. The top five umbrella issues nearly always include public
safety, quality of life, infrastructure, education, and economic development.• Breaking down each issue using a modified SWOT analysis and then addressing what they want to focus on
and improve upon the next year.
• Coming up with 50 to 100 individual action items, prioritizing them, and then creating a workplan.
The manager and the department heads then allocate responsibilities and time frames for completion. This plan forms the basis for the manager's and the department heads' performance appraisal.
Development of the manager. Having a manager with yesterday's ideas is like eating day-old bread. It won't kill you, but it also won't satisfy your palate.
The demands of running a multimillion-dollar business with staff, equipment, changing technology, constant changes in regulations and legislation, employees, unions, and resident demands requires a manager who is up-to
date, understands best practices, and manages with knowledge and confidence.
Ongoing professional development readies the manager. It must be a requirement of each manager and an
essential component to discuss during the review process.
Performance appraisal cannot simply be a look back. What happened yesterday cannot be changed. The review must include a look forward, and one way to guarantee that a manager can get a community to where it wants to
go is through professional development.
Managers need continuous skills training, exposure to new ideas and concepts, interaction with other successful
managers, knowledge of changes in legislation and regulations, and awareness of emerging trends. Seminars, professional association programs, conferences, and college seminars are essential elements to this development
process.
Communication is the key. Whether it is on or off the record, fluid, open, and meaningful dialogue that ensures
that everyone is in the loop guarantees success. Managers must talk and listen to the board and vice versa.
The best reviews contain more conversation, with less emphasis on the forms; a clear understanding of the
respec�ive roles and responsibilities; well-defined goals and expectations; metrics and timeliness; and genuine respect and trust. When this is present, the appraisal process is working.
POTENTIAL STUMBLING BLOCKS
Unfortunately, too often these stumbling blocks can derail the process:
Politics. As I regularly find out from talking with managers and elected officials across the country, politics and everything that connotes often poisons the evaluation process. Conflicting agendas, singular motives, scores to
settle, or an unwillingness to embrace the community's mission and vision make governing difficult, thwart
consensus, and derail the process.
As one Florida councilmember stated: "Agendas by councilors prevent good evaluations." When politics gets in the
way, managers become afraid to make bold moves. They fear losing their jobs and become too paralyzed to be effective, and then often shy away from addressing the difficult issues.
http://icma.org/en/press/pm _ magazine/article/I 06284 1/4/2017 363
A Manager's Performance Appraisal: Prepare With Confidence I icma.org
Surprises. Surprises should be left for birthday parties, not evaluations. The review process cannot endure many
surprises. Issues should be addressed as they occur and not stored in a gunnysack and saved for review time.
The governing board and the manager must always be transparent, open, and forthcoming. Matters that seemingly
emerge from left field kill conversation, put individuals on the defensive, and serve no other purpose than to derail
the process.
Report-card approach. A review is a development tool. It is a mechanism to plan for the future. It cannot be a merely a grading mechanism that reminds you of your past shortcomings. You can't be effective with a club over
your head.
Lack of differentiation between performance and personality. Managers are hired to perform. While getting
along and congeniality are important, the more critical piece is getting things done. Having a nice guy who
accomplishes little is not an enviable standard.
That said, defining the important traits of a successful manager is important during the hiring process and
reinforcing these during the appraisal process is appropriate.
A SUCCESSFUL RELATIONSHIP
Local government management can be difficult and complex. To be successful, the relationship between the
manager and elected officials must be open and positive. Each must understand the other's roles and expectations.
The manager's job is to take care of everyone in the organization. Officials expect them to run and grow the business; carry out their mandates; recruit, retain, and develop the internal talent; and prepare the organization for
the future.
It is the role of the officials to take care of the manager in a supportive manner. Managers, like any employees,
want their basic needs met and when they are not, resentment occurs.
They want a governing board that provides clear expectations and accountability standards, understands
managers' needs and expectations, and provides timely performance reviews. Late reviews and salaries that fall below their peers are two areas that cause the greatest resentment resulting in breakdowns in the relations and
turnover of managers.
Next vacation, when everyone happily piles into the car and agrees on a destination and driver, then and only then
can it be viewed as a positive experience. Managing a city or county requires the same. And when that happens, everyone can enjoy the ride.
Rick Dacri is a management adviser, Dacri & Associates, Kennebunk, Maine, and author of the book Uncomplicating Management: Focus on Your Stars & Your Company Will Soar (rick@dacri.com; www.dacri.com).
COMMENTS & RATINGS
Community Rating:
Your rating: (optional)
5.0 of 5 stars (average of 1 review)
Linda Kelly said
Show breakdown
Oct 13 2015
This is excellent advice. I am preparing for my annual evaluation and this is a terrific refresher of the whys and hows of the process, and even more important, a reminder to keep it all in perspective, as Rick notes the evaluation is "simply a tool used by elected officials to ensure that community goals are being met." Thank you Rick for this helpful article.
http:/ /icma.org/ en/press/pm_ magazine/article/I 06284 1/4/2017 364
Outline of Key Points:
1. What is Executive Evaluation?
2. What is the role of a Board in Executive Evaluation?
3. Methods and Processes for Executive Evaluation
4. Problems to Avoid
5. Content Areas Generally Included
6. Recommended Process
7. Sample Evaluation Form
This briefing was prepared for the in-service education of not-for-profit Boards that must update or formalize their process for evaluating the chief executive.
These materials can be used as a pre-reading document provided to Board members in advance of an active discussion at a regular meeting.
While the presentation has been designed to focus rapidly on the most relevant points, it is likely that Board members will have questions or comments or modifications to suggest on specific issues pertinent to the particular Board in question.
Briefing, Executive Evaluation
366
What is Executive Evaluation?
o The process of planning and reviewing theperformance of senior management.
o A means of demonstrating organizational stewardshipand accountability to stakeholders.
o A means of maintaining alignment between goals setand achievements reached.
o An element of decisions about compensation.
o A means of determining the need for furtherprofessional development, education, or training.
Other names for this process are "performance management" or "performance appraisal".
Ideally, the performance review of executives fits \,vith an overall management philosophy of an organization. In particular, the evaluation of an executive works best if the organization is disciplined about setting goals, reviewing progress, and making improvements at all levels, from Board actions through staff management.
Good performance review processes are helpful in making appropriate compensation decisions, and they should also be useful in guiding the priorities set for professional development activities.
Briefing, Executive Evaluation
367
What is the role of a Board in Executive Evaluation?
o Sets the annual objectives/ goals for the chief executive,reviews results and achievements annually, makescompensation decisions.
o Evaluation responsibility usually held by a smallergroup within the Board - eg. Executive Committee,Compensation Committee, Nominating Committee.
o Need to balance relationship of support and trust witha relationship of accountability.
Good working relationships between executives and Boards are important, and they create an opportunity and a challenge. (Unsatisfactory relationships are even more challenging.)
The opportunity is that in a relationship of trust and support, Board members and chief executives can have an honest dialogue about what is being accomplished, where the gaps may be, and how to maintain progress. Good relationships promote candor and constructive planning.
On the challenge side, there are two potential problems. One challenge is that Board members may represent a diverse group of voices that may not be unified in their expectations of the chief executive. Another challenge is that when relationships are close, supportive, and friendly, there can be a reluctance to bring up areas of performance that need improvement and a tendency to avoid conflict.
Briefing, Executive Evaluation
368
Methods and Processes for Executive Evaluation:
[J A "book-end" process --- performance assessed VERSUS objectives or expectations set earlier.
[J Matters of style: how formal versus informal; how much driven by formula versus Board discretion.
[J Multi-source feedback increases validity (Board members, subordinate staff, external contacts).
[J Combination of written and verbal communication.
A good rule of thumb for performance evaluation is "no surprises". The endof-period appraisal should reflect the tone and direction of feedback provided at earlier junctures. The best assurance of such coherence is that the evaluation be conducted versus known and established expectations.
Each organization has its own culture and degree of structure or formality in the processes by which it is managed. In particular, it is important to decide whether the performance will be "by the numbers" or whether it will include variables that are based on subjective assessment. Both are legitimate, especially with respect to the most senior leader of an organization.
While not essential, some form of feedback from more than one angle of vision increases the validity of the performance assessment. However, care must be taken with assessments done by subordinates. Personal interviews by Board members with selected staff regarding executive strengths and weaknesses will minimize the possibility of retaliatory negative input, but may also limit the candor that is sometimes available from surveys.
Performance feedback should be provided to the chief executive in written and verbal form, through the authorized representative of the Board (Board Chair or Chair of Compensation Committee, etc.).
Briefing, Executive Evaluation
369
Problems to Avoid:
o Don't evaluate unless you have set standards againstwhich to measure performance.
o Don't use ratings that only measure popularity orpersonality rather than results.
o Don't deliver an evaluation of raw numbers or scores;provide context and narrative commentary.
o Don't politicize the process - be aware if performanceevaluation is being used as a platform for working outstrategy differences or power issues requiring attentionfrom the Board or Director.
These advisories are intended to ensure that the process has INTEGRITY, OBJECTIVITY, and CONSTRUCTIVE VALUE.
Further, it is important to realize that ahnost any Board or staff activity such as executive evaluation can be "hijacked" in the service of an un-acknowledged conflict that may need to be addressed. Such an issue may be one that is completely unrelated to the problem of executive evaluation, such as which constituency has established the greatest level of influence on the Board, or how will the Board signal its values to outside observers.
Briefing, Executive Evaluation
370
Content Areas Generally Included:
o Evaluate the "WHAT" and the "HOW"(Results that should be accomplished, behaviorsthrough which leadership is demonstrated.)
o Examples of "WHAT":Fulfillment of Mission / Vision / StrategyAchievement of Specific Annual Priorities or GoalsStrategic Leadership and Resource DevelopmentOperational or Program EffectivenessFiscal and Staff ManagementPublic Relations and Advocacy
o Examples of "HOW":Personal Qualities (Integrity, Flexibility, Commitment)Interpersonal Skills (Communications, Influence)Leadership Skills (Trust, Vision, Team Development)
Briefing, Executive Evaluation
371
Recommended Proces:
o Establish which committee or persons shall haveongoing director evaluation responsibility. (Do theBylaws stipulate this already?)
o Establish an annual cycle with calendar dates -Approval of Coming Year Objectives by X date;Review of Previous Year's Performance by Y date;Compensation Actions by Z date.
o Use a written evaluation form. Start with a relativelysimple form*; get more detailed in the future, asneeded. (*Sample attached.)
o Invite feedback from broader group than those whohave responsibility for conducting the assessment. Forexample, ask all Board members for their written input,and seek input from selected members of staff, external
contacts, or client representatives.
o Compile feedback into a performance evaluation that
contains: a) Overall assessment; b) Affirmation ofstrengths and achievements; c) Discussion of any gapsthat are of concern; d) Suggestions for futureprofessional development.
o While compensation actions may be independent of theevaluation, pay decisions should not be incontradiction of the "message" of the evaluation.
Briefing, Executive Evaluation
372
City Manager Performance Evaluation
City of ________________
Evaluation period: _______________ to _______________
______________________________ Governing Body Member’s Name
Each member of the governing body should complete this evaluation form, sign it in the
space below, and return it to ____________________________________. The
deadline for submitting this performance evaluation is __________________________.
Evaluations will be summarized and included on the agenda for discussion at the work
session on ____________________________.
____________________________________ Mayor’s Signature
____________________________________ Date
____________________________________ Governing Body Member’s Signature
____________________________________ Date Submitted
EVALUATION 3
379
INSTRUCTIONS
This evaluation form contains ten categories of evaluation criteria. Each category contains a statement to describe a behavior standard in that category. For each statement, use the following scale to indicate your rating of the city manager’s performance.
5 = Excellent (almost always exceeds the performance standard) 4 = Above average (generally exceeds the performance standard) 3 = Average (generally meets the performance standard) 2 = Below average (usually does not meet the performance standard) 1 = Poor (rarely meets the performance standard)
Any item left blank will be interpreted as a score of “3 = Average”
This evaluation form also contains a provision for entering narrative comments, including an opportunity to enter responses to specific questions and an opportunity to list any comments you believe appropriate and pertinent to the rating period. Please write legibly.
Leave all pages of this evaluation form attached. Initial each page. Sign and date the cover page. On the date space of the cover page, enter the date the evaluation form was submitted. All evaluations presented prior to the deadline identified on the cover page will be summarized into a performance evaluation to be presented by the governing body to the city manager as part of the agenda for the meeting indicated on the cover page.
PERFORMANCE CATEGORY SCORING
1. INDIVIDUAL CHARACTERISTICS
_____ Diligent and thorough in the discharge of duties, “self-starter”
_____ Exercises good judgment
_____ Displays enthusiasm, cooperation, and will to adapt
_____ Mental and physical stamina appropriate for the position
_____ Exhibits composure, appearance and attitude appropriate for executive position
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
380
2. PROFESSIONAL SKILLS AND STATUS
_____ Maintains knowledge of current developments affecting the practice of local government
management
_____ Demonstrates a capacity for innovation and creativity
_____ Anticipates and analyzes problems to develop effective approaches for solving them
_____ Willing to try new ideas proposed by governing body members and/or staff
_____ Sets a professional example by handling affairs of the public office in a fair and impartial
manner
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
3. RELATIONS WITH ELECTED MEMBERS OF THE GOVERNING BODY
_____ Carries out directives of the body as a whole as opposed to those of any one member or
minority group
_____ Sets meeting agendas that reflect the guidance of the governing body and avoids
unnecessary involvement in administrative actions
_____ Disseminates complete and accurate information equally to all members in a timely
manner
_____ Assists by facilitating decision making without usurping authority
_____ Responds well to requests, advice, and constructive criticism
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
4. POLICY EXECUTION
_____ Implements governing body actions in accordance with the intent of council
_____ Supports the actions of the governing body after a decision has been reached, both
inside and outside the organization
_____ Understands, supports, and enforces local government’s laws, policies, and ordinances
_____ Reviews ordinance and policy procedures periodically to suggest improvements to their
effectiveness
_____ Offers workable alternatives to the governing body for changes in law or policy when an
existing policy or ordinance is no longer practical
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
381
5. REPORTING
_____ Provides regular information and reports to the governing body concerning matters of
importance to the local government, using the city charter as guide
_____ Responds in a timely manner to requests from the governing body for special reports
_____ Takes the initiative to provide information, advice, and recommendations to the
governing body on matters that are non-routine and not administrative in nature
_____ Reports produced by the manager are accurate, comprehensive, concise and written to
their intended audience
_____ Produces and handles reports in a way to convey the message that affairs of the
organization are open to public scrutiny
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
6. CITIZEN RELATIONS
_____ Responsive to requests from citizens
_____ Demonstrates a dedication to service to the community and its citizens
_____ Maintains a nonpartisan approach in dealing with the news media
_____ Meets with and listens to members of the community to discuss their concerns and
strives to understand their interests
_____ Gives an appropriate effort to maintain citizen satisfaction with city services
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
7. STAFFING
_____ Recruits and retains competent personnel for staff positions
_____ Applies an appropriate level of supervision to improve any areas of substandard
performance
_____ Stays accurately informed and appropriately concerned about employee relations
_____ Professionally manages the compensation and benefits plan
_____ Promotes training and development opportunities for employees at all levels of the
organization
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
382
8. SUPERVISION
_____ Encourages heads of departments to make decisions within their jurisdictions with
minimal city manager involvement, yet maintains general control of operations by
providing the right amount of communication to the staff
_____ Instills confidence and promotes initiative in subordinates through supportive rather than
restrictive controls for their programs while still monitoring operations at the department
level
_____ Develops and maintains a friendly and informal relationship with the staff and work force
in general, yet maintains the professional dignity of the city manager’s office
_____ Sustains or improves staff performance by evaluating the performance of staff members
at least annually, setting goals and objectives for them, periodically assessing their
progress, and providing appropriate feedback
_____ Encourages teamwork, innovation, and effective problem-solving among the staff
members
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
9. FISCAL MANAGEMENT
_____ Prepares a balanced budget to provide services at a level directed by council
_____ Makes the best possible use of available funds, conscious of the need to operate the
local government efficiently and effectively
_____ Prepares a budget and budgetary recommendations in an intelligent and accessible
format
_____ Ensures actions and decisions reflect an appropriate level of responsibility for financial
planning and accountability
_____ Appropriately monitors and manages fiscal activities of the organization
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
383
10. COMMUNITY
_____ Shares responsibility for addressing the difficult issues facing the city
_____ Avoids unnecessary controversy
_____ Cooperates with neighboring communities and the county
_____ Helps the council address future needs and develop adequate plans to address long
term trends
_____ Cooperates with other regional, state and federal government agencies
Add the values from above and enter the subtotal _____ ÷ 5 = _____ score for this category
NARRATIVE EVALUATION
What would you identify as the manager’s strength(s), expressed in terms of the principle
results achieved during the rating period? ___________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
What performance area(s) would you identify as most critical for improvement? _____________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
384
What constructive suggestions or assistance can you offer the manager to enhance
performance? ________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
What other comments do you have for the manager; e.g., priorities, expectations, goals or
objectives for the new rating period? _______________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
385
City Manager Evaluation
Please rate the city manager using the following scale: Rating
1 2
3
Description Unacceptable - Unsatisfactory performance Conditional - Requires Improvement Satisfactory - Meets Council expectations
EVALUATION 4
4
5 Exceptional - Generally exceeds Councils expectations Outstanding - Substantially exceeds Councils expectations
Pl ease return your eva uat1on orm to t e f h M "bl ayor as soon as poss1 e.
Does the City Manager maintain a Rating Comments: standard of respect for department head's ability and encourage their initiative? Does he cha! lenge them to perform at their highest level?
Does the city manager inspire others to Rating Comments: succeed? Does he actively promote efficiency m operations? Does he demonstrate a high regard for personal ethics?
Does he understand the laws and Rating Comments: ordinances of the city and cause them to be fairly enforced?
Does the city manager work well with Rating Comments: . .
and properly handle their c1t1zens complaints?
Does the city manager properly handle Rating Comments: his administrative duties?
Y:\CITY COUNCD.., AGENDAS and MlNUTES\2017 Council Mtgs\0 1-28-2017 - Retreat\City Manager Evaluation\City Manager Performance Evaluation 4.odl
386
Does the city manager work well with Rating Comments: developers while protecting the city's
interest? Does he work to increase the
city's tax base through economic development?
Does the city manager cooperate Rating Comments: cordially with neighboring communities and citizens while looking
after the interests of Bonner Springs?
Does the city manager work well with Rating Comments: the city council in making sure there is
adequate information available prior to meetings? Is he willing to meet with council members to deal with individual problems and issues?
Does the city manager involve himself Rating Comments: in the planning process to the correct
degree? Does he review the process and look for better ways to handle development activities?
Does the city manager ensure the Rating Comments: budget is prepared and executed in the
manner approved by the city council?
Does he ensure the city's monies are
managed properly?
Additional Comments:
Y:\CITY COUNCIL AGENDAS and MINUTES\2017 Council Mtgs\0 1-28-2017 - Retreat\City Manager Evaluation\City Manager Performance Evaluation 2.odt
387
Name of Rater: _______________ _ Date: _______ _
Y:\CITY COUNCIL AGENDAS and MINUTES\2017 Council Mtgs\0 1-28-2017 - Retreat\City Manager Evaluation\City Manager Performance Evaluation 2.odt
388
GROUP II. POLICY FACILITATION
Helping elected officials and other community actors identify, work toward, and achieve common goals and objectives (requires knowledge of group dynamics and political behavior; skill in communication, facilitation, and consensus-building techniques; ability to engage others in identifying issues and outcomes)
_l. Facilitative Leadership. Building cooperation and consensus among and within diverse groups, helping them identify common goals and act effectively to achieve them; recognizing interdependent relationships and multiple causes of community issues and anticipating the consequences of policy decisions (requires knowledge of community actors and their interrelationships)
_2. Facilitating Council Effectiveness. Helping elected officials develop a policy agenda that can be implemented effectively and that serves the best interests of the community (requires knowledge of role/authority relationships between elected and appointed officials; skill in responsibly following the lead of others when appropriate; ability to communicate sound information and recommendations)
_3. Mediation/Negotiation. Acting as a neutral party in the resolution of policy disputes (requires knowledge of mediation/negotiation principles; skill in mediation/negotiation techniques)
10/29/98; City Management Performance Rating
390
GROUP III. SERVICE DELIVERY MANAGEMENT
Ensuring that local government services are provided to citizens effectively, efficiently, and responsively (requires knowledge of service areas and delivery options; skill in assessing community needs, allocating resources, and predicting the impact of service delivery decisions; ability to set performance/productivity standards and objectives and measure results)
_l. Functional/Operational Expertise. Understanding the basic principles of service delivery in functional areas -- e.g. public safety, community and economic development, human and social services, administrative services, public works
_ 2. Operational Planning. Anticipating future needs, organizing work operations, and establishing timetables for work units or projects (requires knowledge of technological advances and changing standards; skill in identifying and understanding trends)
_ 3. Citizen Service. Determining citizen needs and providing responsive, equitable services to the community (requires knowledge of information gathering techniques)
_ 4. Quality Assurance. Maintaining a consistently high level of quality in staff work, operational procedures, and service delivery (requires knowledge of organizational processes; ability to facilitate organizational improvements)
10/29/98; City Management Performance Rating
391
GROUP V. DEMOCRATIC RESPONSIVENESS
Demonstrating a commitment to democratic principles by respecting elected officials, community interest groups, and the decision making process; educating citizens about local government; and acquiring knowledge of the social, economic, and political history of the community (requires knowledge of democratic principles, political processes, and local government law; skill in group dynamics, communication, and facilitation; ability to appreciate and work with diverse individuals and groups and to follow the community's lead in the democratic process)
_l. Democratic Advocacy. Fostering the values and integrity of representative government and local democracy through action and example; ensuring the effective participating oflocal government in the intergovernmental system (requires knowledge and skill in intergovernmental relations)
_2. Diversity. Understanding and valuing the differences among individuals and fostering these values throughout the organization and the community
_3. Citizen Participation. Recognizing the right of citizens to influence local decisions and promoting active citizen involvement in local government
10/29/98; City Management Performance Rating
392
GROUP VI. ORGANIZATIONAL PLANNING AND MANAGEMENT
Providing for the short-term and long-term acquisition, allocation, and analysis of financial and human resources (requires knowledge and skill in budgeting, financial analysis, human resources management, and strategic planning)
_1. Budgeting. Preparing and administering the budget (requires knowledge of budgeting principles and practices, revenue sources, projection techniques, and financial control systems; skill in communicating financial information)
_2. Financial Analysis. Interpreting financial information to assess the fiscal condition of the community, determine the cost-effectiveness of programs, and compare alternative strategies (requires knowledge of analytical techniques and skill in applying them)
_3. Human Resources Management. Ensuring that the policies and procedures for employee hiring, promotion, performance appraisal, and discipline are equitable, legal, and current; ensuring that human resources are adequate to accomplish programmatic objectives (requires knowledge of personnel practices and employee relations law; ability to project workforce needs)
_4. Strategic Planning. Positioning the organization and the community for events and circumstances that are anticipated in the future (requires knowledge oflong-range and strategic planning techniques; skill in identifying trends that will affect the community; ability to analyze and facilitate policy choices that will benefit the community in the long run)
10/29/98; City Management Performance Rating
393
GROUP VII. COMMUNICATION
Facilitating the flow of ideas, information, and understandings between and among individuals; advocating effectively in the community interest (requires knowledge of interpersonal and group communication principles; skill in listening, speaking, and writing; ability to persuade without diminishing the views of others)
_1. Advocacy. Communicating personal support for policies, programs, or ideals that serve the best interest of the community
_2. Presentation Skills. Conveying ideas or information effectively to others (requires knowledge of presentation techniques and options; ability to match presentation to audience)
_3. Media Relations. Communicating information to the media in a way that increases public understanding oflocal government issues and activities and builds a positive relationship with the press (requires knowledge of media operations and objectives)
_4. Interpersonal Communication. Exchanging verbal and nonverbal messages with others in a way that demonstrates respect for the individual and furthers organizational and community objectives (requires ability to receive verbal and nonverbal cues; skill in selecting the most effective communication method for each interchange)
10/29/98; City Management Performance Rating
394
GROUP VIII. INTEGRITY
Demonstrating fairness, honesty, and ethical and legal awareness in personal and professional relationships and activities (requires knowledge of business and personal ethics; ability to understand issues of ethics and integrity in specific situations)
_l . Personal Integrity. Demonstrating accountability for personal actions; conducting personal relationships and activities fairly and honestly
_2. Professional Integrity. Conducting professional relationships and activities fairly, honestly, legally, and in conformance with the ICMA Code of Ethics (requires knowledge of administrative ethics and specifically the ICMA Code of Ethics)
_3. Organizational Integrity. Fostering ethical behavior throughout the organization through personal example, management practices, and training (requires knowledge of administrative ethics; ability to instill accountability into operations; and ability to communicate ethical standards and guidelines to others)
10/29/98; City Management Performance Rating
395
BURLESON SPECIFIC CRITERIA
In addition to the ICMA Practices, the following items are considered important by the City Council, for the effective management of the City of Burleson organization.
1. Communication with Council. Accurately interprets the direction of the CityCouncil; keeps the City Council well informed
_ 2. Community Relationship. Keeps an active and positive relationship with the community; providing information to citizens; speaking to community organizations; reaching out to keep community relationship alive
_ 3. Working with Other Entities. Strives to build and maintain positive working relationships with other government entities, such as State, counties, school districts, federal agencies, and others
_ 4. Maintaining Sensitivity. Listens and understands positions and circumstances of others; communicates that understanding toward problem solving and improved communications
5. Sense of Humor. Maintains and shares an appropriate sense of humor, to helpcreate positive working environment for city organization
_ 6. Crises Management. Deals effectively when a crises occurs, handling situation and keeping City Council informed
10/29/98; City Management Performance Rating
396
EVALUATION 7
SECTION I: ASSISTING COUNCIL WITH ITS POLICY-MAKING ROLE
Needs Improvement
Meets Expectations
Exceeds Expectations
A. Providing Information
The City Manager provides information which is: Detailed and reliable Explained in a thorough manner and includes alternatives or recommendations Timely Helpful in preventing trivial administrative matters from being reviewed by the Council Helpful and adequate to assist City Council in making sound decisions
The City Manager: Provides members of City Council with the opportunity to set long-term organizational goals and to establish the future direction of City policy Keeps City Council informed, in a timely manner, of the things Council wants to know Keeps City Council well informed with concise written and oral communications Provides City Council members with information on an equal basis Informs the City Council of administrative developments Follows up in a timely manner on City Council requests for information or action
B. Providing Advice
The City Manager: Has adequate knowledge of municipal affairs, including the City’s laws and ordinances Considers alternatives before making recommendations Plans ahead, anticipates needs and recognizes potential problems Has a good sense of timing in bringing issues to the Council for action
Comments:
406
SECTION II: INTERNAL ADMINISTRATION
Needs Improvement
Meets Expectations
Exceeds Expectations
A. Implementation of Council Policies
The City Manager is effective in the following areas: Carrying out Council directives Assigning work so that it is performed efficiently and effectively Paying sufficient attention to detail to avoid error or things “slipping through the cracks” Analyzing problems or issues and identify causes, reasons, and implications Accurately interpreting the direction given by Council Carrying out the directives of Council as a whole rather than those of any one Council member, but recognizes the concerns of the minority Supporting the actions of the City Council after a decision is made Assuming responsibility for staff performance Providing members of City Council with periodic status reports on projects or tasks which may overlap months or years in implementation Insuring that the management staff maintains normal service delivery operations as well as the flexibility to manage emergency situations
B. Financial Management
Are you satisfied with the City Manager’s: Approach to budget preparation and review Use of standard financial management procedures to meet Council’s policy guidelines Implementation of Council’s policy regarding the expenditure of budgeted funds Cost control through economical use of labor, materials and equipment Information on the financial status of City government Use of available funds and his ability to operate the City efficiently and effectively Knowledge of financial matters Information pertaining to long or short-term financing for capital projects or equipment purchases Information on opportunities for federal and state grant funding
407
Needs Improvement
Meets Expectations
Exceeds Expectations
C. Personnel Management The City Manager is:
Successful in guiding people as a team toward common objectives Effective in selecting qualified and highly competent staff members Effective in maintaining professional relationships with Department Directors Effective in assuring that staff members make a positive impression on citizens
The City Manager: Insures that the City’s personnel policies and practices are administered by City Department Directors and management staff in an equitable manner Develops and motivates employees so that they are increasingly effective Addresses disciplinary problems and takes action when warranted Monitors performance of employees and initiates corrective action as needed
Comments:
408
SECTION III: EXTERNAL RELATIONS
Needs Improvement
Meets Expectations
Exceeds Expectations
A. Citizen Relations
The City Manager: Makes a positive impression on citizens and is he respected in the City of Oviedo Has appropriate visibility or identity in the community Assists the Council in resolving problems at the administrative level to avoid unnecessary Council action Is willing to meet with members of the community and discuss issues of concern Is skillful with the news media, avoiding political positions and partisanship Provides information to the public in a timely fashion on matters which will cause public reaction Represents Council positions and policies accurately and effectively Thinks and acts in a manner reflecting an attitude that client (Council, staff or citizens) perceptions and satisfactions are important Responds completely and in a timely manner to citizen complaints
B. Intergovernmental Relations
The City Manager is: Effective representing the City’s interests in dealing with other agencies Participative in enough intergovernmental activity to have an impact on behalf of the City Cooperative with the county, state and federal governments
Comments:
409
SECTION IV: PERSONAL ACCOMPLISHMENTS
Needs Improvement
Meets Expectations
Exceeds Expectations
A. Communications
With regard to communications, the City Manager is: Easy to talk to and a good listener Thoughtful, clear and to the point Sensitive to the concerns of others Candid and forthright in discussing City business matters with members of City Council
B. Management Style
The City Manager Demonstrates interest and enthusiasm in performing his duties Commands respect and good performance from staff Shows initiative and creativity in dealing with issues, problems and unusual situations Is open to new ideas and suggestions for change Works well under pressure Consistently puts aside personal views and implements Council policy and direction Displays the ability to resolve the numerous conflicts inherent in municipal government Responds well to a changing world and local conditions; is adaptive Is accessible to City Council members Conforms to the high standards of the profession; follows the “ICMA Code of Ethics Exhibits a commitment to continuing education in order to encourage his professional development Is receptive to constructive criticism and advice
410
Needs Improvement
Meets Expectations
Exceeds Expectations
C. Job Effectiveness
The City Manager: Demonstrates interest and enthusiasm about the Council’s Vision for the City Gives his staff the tools necessary to provide efficient, responsive City services Coordinates the implementation of City goals and objectives Supports policies that will promote annexation and growth in the City of Oviedo Creates a positive atmosphere for successful economic development in the City Supports responsible infrastructure expansion and maintenance Emphasizes the need for employee training and technological improvements
Comments:
411
SECTION V: NARRATIVE RESPONSES
ACHIEVEMENTS FROM THIS PAST YEAR:
• What were the Manager’s most notable accomplishments during the past year?
• Which of the Manager’s qualities were most instrumental in fulfilling the role of City Managerthis past year?
PERFORMANCE OBJECTIVES FOR COMING YEAR:
• What does the Manager do that you would like him to continue?
• Is there anything that the Manager does that you would like him to do differently?
• In what areas should the Manager focus his attention in this coming year?
• Do you have any other general comments to share with the City Manager?
______________________________________ ____________________ Rater’s Signature Date
412