Paket : 01-15 PST

Pekerjaan : Pembangunan Stasiun Tanjung beserta Pembangunan Peron Sedang dan Akses Jalan Masuk ke Stasiun Tanjung

1 Pekerja @ = / oh

2 Pekerja jaga @ = / oh

3 Tenaga bongkar @ = / oha. Pelaksana @ = / oh

a. Tukang @ = / oh

a. Tukang Kayu @ = / oh

b. Tukang Batu @ = / oh

c. Tukang Besi @ = / oh

d. Tukang Las @ = / oh

f. Tukang Cat @ = / oh

f. Tukang Gerinda @ = / oh

4 Kepala Tukang @ = / oh

5 Mandor @ = / oh

6 Pengawas @ = / oh

7 Juru Ukur @ = / oh

8 Juru Gambar @ = / oh

9 Operator @ = / oh

10 Operator komputer @ = / oh

11 Pembantu Operator @ = / oh12 Tenaga pelaksana @ = / oh

13 Tenaga ahli @ = / oh

14 Pekerja Khusus @ = / oh

1 Sewa Sheepfoot Rollers @ = / jam

1 Sewa Mesin gilas 8 - 10 ton @ = / jam

2 Sewa Buldozer TD.25 @ = / jam

3 Sewa Excavator PC. 1800 @ = / jam

4 Sewa Forklift @ = / hr

4 Sewa Dump truck 3.5 Ton @ = / jam

5 Sewa Dump Truck Kapasitas 5 ton @ = / jam

6 Sewa Vibrator roller @ = / jam7 Sewa Flat truck 18 Ton @ = / jam

8 Sewa Trailer 20 ton @ = / jam

9 Sewa Crane 20 Ton @ = / jam

10 Sewa Stamper @ = / jam

11 Sewa Theodolith dengan EDM @ = / unit

12 Sewa Water pass @ = / unit

1 BATU

 Abu batu @ = / m3

 Agregat klas A @ = / m3

 Agregat klas B @ = / m3

Batu belah @ = / m3

Batu pecah/split 1/2 di quary @ = / m3

Batu pecah/split 2/3 di quary @ = / m3

Balas batu pecah di quary @ = / m3

Batu bata klas I @ = / bh

Batu Tempel @ = / m2

2 BESI BAJA 

 Asbes gelombang kecil 4mm 80x180 @ = / lbr

 Asbes gelombang besar 5mm 80x180 @ = / lbr

Besi beton U 32 ulir @ = / bh

Besi beton U 39 ulir @ = / kg

Besi beton U 42 ulir @ = / bh

Besi beton U 24 polos @ = / kg

Besi IWF 300x150x6.5x9 pj. 12 m @ = / btg

Besi IWF 300x150x6.5x9 pj. 6 m @ = / btgBesi IWF 300x150x6.5x9 pj. 4+1 m @ = / btg

Besi IWF 150x50 x5x7 pj. 2 m @ = / btg

Besi IWF 150x50 x5x7 pj. 1 m @ = / btg

DAFTAR UPAH PEKERJA DAN HARGA BAHAN

 A. UPAH

B. SEWA ALAT

C. HARGA BAHAN

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 2/8

siku 70.70.7 @ = / btg

siku 50.50.5 @ = / btg

Besi canal CNP, 150x50x3.2 pj. 6m @ = / btg

Besi canal c. 100x50x20x2 lisplang,sopi2 @ = / btg

Besi canal c. 100x50x20x2 tutup keong @ = / btg

Base plat, 20 mm @ = / btg

Base plat, 10 mm @ = / btg

Base plat, 6 mm @ = / btg

Plat 1.2 mm @ = / btg

Siku 50.50.5, ikatan angin, pjng 9.6 m @ = / btgSiku 50.50.5, ikatan angin, pjng 8 m @ = / btg

Besi beton 12 mm, ikatan angin, pjng 4.5 m @ = / btg

Besi beton 12 mm, trektang, pjng 1.2 m @ = / btg

Baut angker, dia 22 @ = / btg

Baut dia 16 HTB @ = / btg

Baut dia 12 @ = / btg

Begel talang @ = / btg

Pipa galvanis Ø 5", pj. 9 m @ = / btg

Pipa galvanis Ø 5", pj. 6 m @ = / btg

Besi Strip @ = / kg

Baut bantalan jembatan dia. 19-270 mm @ = / bh

Baut sindik diameter 19-270 mm @ = / bh

Begel rel bendel 19 mm @ = / bh

Baut mur @ = / bh

3 ASPAL Aspal @ = / kg

Residu / Ter @ = / ltr

 Aspal Hotmix tebal 5 cm @ = / m2

 Aspal Hotmix @ = / kg

4 KAWAT

Kawat Galvanis Ø 4 mm @ = / kg

Kawat pral @ = / kg

Kawat ikat dia. 5 mm @ = / kg

Kawat beton @ = / kg

Kawat las/elektroda @ = / kg

Kawat duri @ = / m

Kawat las @ = / kg

Elektroda pengerasan @ = / bh

5 KAYU

Kayu klas I @ = / m3

kayu klas II @ = / m3

Kayu Klas III @ = / m3

Kayu Klas IV @ = / m3

Kayu Kaso 4/6 @ = / m3

Dolken 8 - 10 cm @ = / btg

Bambu 8 - 10 cm @ = / btg

Papan @ = / m3

Formika @ = / lbr

Kayu bakar @ = / pkt

Kayu terenteng @ = / m3

Bambu Besar @ = / btg

Pohon Kelapa (glugu) dia. 25 cm pj. 6-8 m @ = / btg

Tripleks tebal 4 mm @ = / lbr

Tripleks tebal 6 mm @ = / lbrMultiplek 9 mm @ = / lbr

Multiplek 12 mm @ = / lbr

Multiplek 18 mm @ = / lbr

Jendela kaca naco @ = / set

Kayu ganjal @ = / bh

Pintu panel @ =

Jendela kaca naco @ =

kaca polos tebal 5mm @ =

Lem Putih Fox @ =

alumunium Foil @ =

list Kayu @ =

Rooster papan 20/20 @ =

List Kaca @ =

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 3/8

6 PAKU

Paku campur @ = / kg

Paku seng @ = / kg

Paku tirpon / TN @ = / bh

Paku Maskram @ = / kg

PASIR DAN TANAH URUG

7 Pasir pasang @ = / m3

Pasir urug @ = / m3Sirtu di quary @ = / m3

Tanah urug di Quary @ = / m3

Pasir beton @ = / m3

Gebalan rumput @ = / m2

BETON

8 Beton Readymix K.175 @ = / m3

Beton Readymix K.225 @ = / m3

Beton Readymix K.250 @ = / m3

Beton Readymix K.300 @ = / m3

Beton Readymix K.350 @ = / m3

Beton Readymix K.400 @ = / m3

SEMEN DAN KAPUR 

9 Semen Portland @ = / zak  

Semen Putih @ = / zak  Semen Grouting @ = / kg

Semen Warna @ = / kg

Patok beton uk. 0,15 x 0,15 x 1,25 m (lengkung) @ = / bh

SENG/FIBER GLASS

9 Seng BJLS 25 @ = / lbr

Seng BJLS 30 @ = / lbr

Seng gelombang BJLS 28 @ = / lbr

Plat tutup seng 120 x 2400 x 1,5 @ = / lbr

Zinc alum atap,0.5 mm @ = / lbr

Zinc alum talang @ = / lbr

Zinc alum lisplang, 0.5 mm @ = / lbr

Zinc alum tutup keong @ = / lbr

GEOTEXTILE10 Geotextile (non woven) @ = / m2

Geotextile woven @ = / m2

11 PENAMBAT

Base Plate @ = /bh

Paku tirpon / TN @ = /bh

Rail Pad @ = /bh

Insulator @ = /bh

Penambat elastis @ = /bh

12 BAHAN PERPIPAAN BESI/PVC

a. Check valve 1/2 " @ = /bh

b. Double neuple 1/2" @ = /bh

c. Gate valve 1/2" @ = /bh

d. Pipa PVC dia. 1/2" (AW) @ = /btge. Pipa PVC dia. 3/4" (AW) @ = /btg

f. Pipa PVC dia. 1" (AW) @ = /btg

g. Pipa PVC dia. 1 1/4" (AW) @ = /btg

h. Pipa PVC dia. 2" (AW) @ = /btg

i. Pipa PVC dia. 3" (AW) @ = /btg

 j. Pipa PVC dia. 4" (AW) @ = /btg

k. Pipa PVC dia. 10 " (AW) @ = /btg

l. Pipa Gip 2 1/2" Medium @ = /btg

m. Sambungan pipa PVC dia. 1/2" (AW) @ = /bh

n. Sambungan pipa PVC dia. 3/4" (AW) @ = /bh

o. Sambungan pipa PVC dia. 1" (AW) @ = /bh

p. Sambungan pipa PVC dia. 2" (AW) @ = /bh

q. Sambungan pipa PVC dia. 3" (AW) @ = /bh

r. Sambungan pipa PVC dia. 4" (AW) @ = /bh

s. Stop kran 3/4 " KIT @ = /bht. Talang PVC + Penggantung @ = /btg

u. Water mur 1/2" @ = /bh

v. Water mur 3/8" @ = /bh

w. Lem Paralon 1/2 Kg @ = /bh

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 4/8

BAHAN PENUTUP ATAP

a. Genteng plentong pres mesin ex. Jatiwangi @ = /bh

b. Genteng bubungan ex. Jatiwangi @ = /bh

c. Genteng Morando ex. Jatiwangi @ = /bh

d. Genteng bubungan Morando ex. Jatiwangi @ = /bh

e. Genteng Kanmuri @ = /bh

f. Genteng bubungan Kanmuri @ = /bh

g. Genteng Glazuur @ = /bh

BAHAN PLAFOND

a. Eternit asbes 4 mm ex.atrisco @ = /lbr

b. Eternit asbes biasa 4 mm ex.lokal @ = /lbr

c. GRC 4 mm ex. Atrisco @ = /lbr

d. GRC 4 mm ex. Lokal @ = /lbr

e. Gypsum 6 mm @ = /lbr

f. Gypsum 9 mm [ 120x240 ] @ = /lbr

g. Gypsum 12 mm @ = /lbr

h. List kamper 1 cm @ = /m'

i. List kamper 2 cm @ = /m'

 j. List kamper 5 cm @ = /m'

k. List gypsum 8 x 8 x 200 cm @ = /m'

l. List gypsum 12 x 12 x 200 cm @ = /m'

m. List gypsum 5 x 5 x 200 cm @ = /m'

BAHAN LANTAI DAN PELAPIS DINDINGa. Keramik 10 x 20 KW I DN Putih/Polos @ = /m2

b. Keramik 20 x 20 anti selip (Km) KW I DN bercorak/berwarna Setara Roman @ = /m2

c. Keramik 20 x 25 (Km) KW I DN bercorak/berwarna Setara Roman @ = /m2

d. Keramik 30 x 30 KW I DN putih Setara Roman @ = /m2

e. Keramik 40 x 40 KW I DN Corak Setara Roman @ = /m2

f. Tegel PC 20 x 20 @ = /bh

g. Porselen 11 x 11 warna Standart DN @ = /m2

h. Lantai Keramik artistik 10x10 @ = /bh

i. Keramik 30 x 30 KW I DN putih Setara Roman @ = /bh

 j. Keramik 30 x 30 KW I DN Warna / Motif @ = /bh

k. plint keramik 10 x 30 @ = /bh

l. Keramik lantai 20 x 20 KM @ = /bh

m. Keramik dinding 20 x 20 KM @ = /bh

n. Paving Blok @ = / m2

BAHAN PENGGANTUNG DAN KUNCI

a. Engsel Patron @ = /psg

b. Engsel Harmonika @ = /m'

c. Engsel jendela ring unilon 3" @ = /psg

d. Engsel pintu ring unilon 4" @ = /psg

e. Espagnolet/Grendel tanam @ = /bh

f. Grendel 15 cm @ = /bh

g. Grendel 5 cm @ = /bh

h. Hak angin jendela biasa @ = /bh

i. Kunci 2 slaag Kuda Terbang @ = /bh

 j. Kunci 2 slaag tanam Anchor Standart @ = /bh

k. Kunci 2 slaag tanam Royal @ = /bh

l. Kunci KM bulat ALFA @ = /bh

m. Rel maraton 1 pintu @ = /unit

n. Rel Henderson @ = /unit

o. Sloot jendela tunggal (type per) @ = /bhp. Sloot Pintu Tanam (type per) @ = /bh

q. Tarikan Jendela / Handle @ = /bh

BAHAN ELEKTRIKAL

a. Box Zekering @ = /bh

b. Instalasi titik lampu/stop kontak @ = /ttk  

c. Isolasi @ = /bh

d. Kabel NYA 1 x 1,5 Prima [ 50 meter ] @ = /bh

e. Kabel NYA 1 x 2,5 Prima [ 50 meter ] @ = /bh

f. Kabel NYM 3 x 1,5 Prima [ 50 meter ] @ = /bh

g. Kabel NYM 3 x 2,5 Prima [ 50 meter ] @ = /bh

h. Kabel NYY 3 x 4 Prima [ 50 meter ] @ = /bh

i. Lampu Pijar 5 Watt s/d 40 Watt @ = /bh

 j. Lampu SL Phillips 25 Watt @ = /bh

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 5/8

k. Lampu TL Phillips 20 Watt @ = /bh

l. Lampu TL Phillips 40 Watt @ = /bh

m. Lampu Neon TL Phillips 20 Watt [Lengkap] @ = /bh

n. Lampu Neon TL Phillips 40 Watt [Lengkap] @ = /bh

o. Lampu Mercury 80 Watt @ = /bh

p. Lampu Taman 25 Watt [Tiang + Lampu 1 bh] @ = /bh

q. MCB 1 PHASE @ = /bh

r. MCB 3 PHASE @ = /bh

s. Saklar Broco tunggal standard @ = /bh

t. Saklar Broco seri standard @ = /bhu. Stop Kontak Broco standard @ = /bh

v. Stop kontak Broco 3 phase (Out Bow) @ = /bh

w. Stop kontak Broco 3 phase (In Bow) @ = /bh

x. Grounding @ = /bh

y. AC Split 1 PK @ = /bh

z. Mesin AC Split TOSHIBA (Indoor/Outdoor Unit) @ = /bh

aa. Timah @ = /kg

ab. Split Tembaga dia 1" @ = /bh

ac. Pipa Arde @ = /m'

ad. Kawat BC @ = /m'

af. Air Curtain @ = /unit

ag. Lampu gantung @ = /bh

ah. Lampu Downlight @ = /bh

BAHAN SANITAIR 

a. Bak KM Fiber 60 x 60 @ = /bhb. Closet jongkok standard lengkap kw A @ = /bh

c. Closet duduk standard lengkap kw A @ = /bh

d. Urinal Lengkap @ = /bh

e. Asi Part Urinal (Pembatas) @ = /bh

f. Floor Drain @ = /bh

g. Kran bebek ITAP 3/4" @ = /bh

h. Kran stainlees lokal kait @ = /bh

i. Kran tembok ITAP 1/2" @ = /bh

 j. Kran Wastafel @ = /bh

k. Mesin Pompa Air Jet Pump 150 watt @ = /bh

l. Mesin Pompa Air Jet Pump 250 watt @ = /bh

m. Pompa Dragon Asli @ = /bh

n. Saringan air lantai Km stainlees steel @ = /bh

o. Tangki air Fiber Glass 1 m3 @ = /bh

p. Tempat sabun keramik @ = /bhq. Wastafel Gantung [Lengkap ] @ = /bh

r. Jet Shower Closed @ = /bh

s. Jet Shower Mandi @ = /bh

t. Paper Holder/Tempat Tissue Gulung Toilet @ = /bh

 ALAT - ALAT KERJA 

11 Tambang manila @ = / kg

Senteleng bambu @ = / bh

kuas 3" @ = / bh

Mata bor kayu @ = / bh

Mata bor besi standard @ = / bh

Mata Bor rel R.54 @ = / bh

Gerinda batu api @ = / bh

Gagang martil @ = / bh

Sikat baja @ = / bh

Linggis songkel @ = / bhSikat bulu @ = / bh

Linggis bobok @ = / bh

Martil besar @ = / bh

Gergaji kayu @ = / bh

Mata Gergaji besi @ = / bh

Cetok/sendok aduk @ = / bh

Paselin @ = / kg

Kikir 1.5 " @ = / bh

PEKERJAAN PEMECOKAN DENGAN MEKANIK BERAT

12 Mesin MTT @ = / m'

Mesin PBR @ = / m'

Mesin VDM @ = / m'

LAIN - LAIN13 Ampelas @ = / lbr

Biaya pengawalan @ = / oh

Biaya angkut rel dengan KA / KLB @ = ton/k  

Biaya angkut dengan KA / KLB @ = ton/k  

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 6/8

Ongkos angkut dengan truck @ = / km

Ongkos muat bongkar rel R.42/R.54 @ = / ton

Oksigen @ = / tab

Oksigen (46 kg) @ = / tab

LPG (12 kg) @ = / tab

LPG (46 kg) @ = / tab

Logo Lambang PT. KAI @ = /ls

Logo Lambang Kemenhub @ = /ls

Papan Nama Stasiun @ = /ls

Regulator Oksigen @ = / bhRegulator LPG @ = / bh

Olie sae 30 - 40 @ = / ltr

Premium / Bensin @ = / ltr

Batu gerinda tangan @ = / bh

Batu gerinda piringan @ = /bh

Batu gerinda profil @ = / bh

Tenda Plastik 3x4 @ = / lbr

Solar @ = / ltr

Pipa PVC dia. 2" (type AW) 4 m @ = / m'

Karung plastik @ = / bh

 Additive beton @ = / kg

Pohon Kelapa (glugu) dia. 25 cm pj. 6-8 m @ = / btg

Kain Lap / Majun @ = / bh

Kaca/naco polos tebal 5 mm - 70 cm @ = / lbr

Tebeng @ = / bh

Hand sain @ = / bhBendera merah / kuning @ = / bh

Plamir dinding @ = / kg

Cat kayu @ = /kg

Cat dasar @ = / kg

Cat tembok Luar @ = / kg

Cat dinding @ = / kg

Waterfroofing @ = / ltr

Kertas gambar @ = / m'

Ember @ = / bh

Cookes @ = / kg

Ongkos muat ke gerbong dengan loader @ = / m3

Ongkos bongkar balas dan ecer di lokasi @ = / m3

Ongkos angkut maksimum dari quary ke depo balas/tempat muat @ = / m3

Ongkos muat, angkut, ecer patok beton ke lokasi kerja @ = / bh

Pemasangan patok lengkung, termasuk gambar grafik busur @ = / bhPengecatan patok beton (1 x dasar, 2 x cat) @ = / bh

Roll cat @ = / bh

tempat muat

Zat asam @ = / btl

Ter @ = / kg

Bahan las thermit @ = / set

sarung tangan @ = / bh

Pahat Skrap @ = / bh

Pengadaan H-Beam 400 x 300 x 12 x 25 @ = / bh

Sewa H-Beam 500 x 300 x 16 x 28 / ton @ = / bh

Sewa H-Beam 200 x 200 x 8 x 12 / ton @ = / bh

Tilfor @ = / bh

Roller @ = / bh

Teflon @ = / m2

Cat Epoxy @ = / liter

Cat Zinkromate @ = / kgPolyurethane @ = / liter

Thinner no.1 @ = / liter

Thiner Polyurethane @ = / liter

Majun @ = / kg

Sabun Cream @ = / kg

 Ampelas @ = /m

Patok rel pengaman jln.perlintasan & cor beton @ = / bh

Rambu lalulintas tanda STOP termasuk bahan @ = / bh

Rambu tanda "AWAS KERETA API", termasuk bahan @ = / bh

Rambu / tanda "Semboyan 35" termasuk bahan @ = / bh

Biaya ijin dan telex pemasangan Semboyan @ = / ls

Semboyan (2A, 2B, 2C dan 3) termasuk tiang @ = / bh

Lampu semboyan @ = / bh

 Angkutan wesel lengkap @ = / bh

Grease (pelumas) @ = / ltr

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 7/8

 ALAT BANTU, BONGKARAN DAN PERLENGKAPAN

14 Alat bantu @ = / Ls

 Alat bantu pembuatan jalan sementara @ = / Ls

 Alat bantu pembuatan jembatan sementara @ = / Ls

 Alat bantu bongkar jembatan sementara @ = / Ls

 Alat angkut material bekas jembatan sementara @ = / Ls

 Alat bantu (lorry, balok, kawat, dll.) @ = / Ls

 Alat bantu dokumentasi @ = / Ls

 Alat bantu pasang gabion untuk penahan ballas @ = / Ls Alat bantu memasukan balas (pengki, gorekan,skop, dll) @ = / Ls

 Alat bantu Pekerjaan HTT untuk angkatan @ = / Ls

 Alat Bantu Muat / Bongkar Rel @ = / Ls

 Alat bantu Pemasangan Bantalan Beton @ = / Ls

 Alat bantu Pemasangan Bantalan Kayu @ = / Ls

 Alat bantu pekerjaan rel @ = / ls

 Alat bantu pembuatan block zoden @ = / Ls

 Alat bantu pemindahan tiang listrik/telpon @ = / unit

Roll meter @ 50 m @ = / bh

Shop drawing untuk pengukuran topografi @ = / Ls

Utilitas investigasi @ = / Ls

Bongkar Direksi keet setelah pekerjaan selesai @ = / Ls

Transportasi pembersihan lokasi dari sisa pek. @ = / unit

Juru kamera @ = / ob

Bongkar tiang lama @ = / unit

Mendirikan tiang baru berikut cor @ = / unitPenyanggan sementara tiang baru dengan kawat @ = / unit

Mobilisasi dan demobilisasi alat berat @ = / unit

Jahit dan gelar geotextile @ = / m2

Test kepadatan tanah dasar @ = / unit

Test kepadatan tanah DCP dan CBR @ = / unit

Kaso 4 x 6 cm, cat dan paku untuk pengukuran @ = / Ls

Las Elektroda @ = / ttk  

Bambu sedang @ = / btg

Ijuk @ = / kg

Saluran beton pracetak @ = / m'

Peralatan gambar lengkap @ = / set

Benang @ = / roll

Biaya pemboran untuk lubang bor pile D 0,6 m @ = / m'

Biaya pemboran untuk lubang bor pile D 1,0 m @ = / m'

Loading test @ = / unitBiaya pek. Waterprofing/railing/m @ = / Ls

Material waterprofing/railing @ = / Ls

Bantalan Elastomer T.1 @ = / unit

Upah pengadaan dan pasang elastomer/unit @ = / unit

Material Elastomer jembatan T.2 @ = / unit

Galian dan angkat kabel CTC dan urug kembali @ = / Ls

Gali dan gelar kabel CTC dan urug kembali @ = / Ls

Sambung kabel dg lasmof dan tambah kabel CTC @ = / Ls

Relokasi tiang sinyal 2 aspek dan bahan @ = / Ls

Mobilisasi dan demobilisasi pemindahan kabel @ = / Ls

Bantalan Elastomer T.3 @ = / unit

Penerangan dan perlengkapan direksi keet @ = / Ls

Keamanan lingkungan @ = / Ls

Biaya akomodasi petugas pengawalan KA @ = / Ls

Pembongkaran kisdam @ = / m2

Biaya pengujian tanah @ = / LsSewa Blander potong / hr @ = / hr

Sewa Blander potong @ = / jam

Dongkrak Pal @ = / hr

Katrol kapasitas 10 ton @ = / hr

Biaya Operasi MTT @ = / m

Biaya Operasi PBR @ = / m

Biaya Operasi VDM @ = / m

Biaya Sewa MTT @ = / m

Biaya Sewa PBR @ = / m

Biaya Operasional MTT & PBR @ = / m

Biaya Operasional MTT & PBR track gongsol @ = / m

Membongkar perlintasan @ = / unit

Perlengkapan alat kerja las thermit @ = / hr

7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15

http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 8/8

Transportasi alat las thermit @ = / hr

Pengamanan Operasi las thermit @ = / hr

drip perusut @ = / kg

kul mesin sleep @ = / bh

kaca mata blander @ = / bh

kaca mata sleep @ = / bh

Mata Gergaji besi standart (p = 18") @ = / bh

Masker Las @ = / bh

meteran 2 m @ = / bh

meteran 5 m @ = / bhnozel 10 -25 @ = / bh

selang angin @ = / m

selang elpiji @ = / kg

selang zat asam @ = / kg

seng untuk mal @ = / kg

sumbat telinga @ = / bh

Reamer @ = / bh

steel great @ = / kg

sarung tangan pendek @ = / bh

Perancah @ = / kg

Sewa Pick Up / bln @ = / Bln

Sewa motor @ = / Bln

Sewa Mesin gerinda MP 12 @ = / hr

Sewa Mesin gerinda tangan @ = / hr

Sewa Mesin Weldshear manual @ = / hr

Sewa alat ukur pembuatan shop/Asbuilt drawing @ = / LsSewa concreete pump @ = / jam

Sewa trimy @ = / Ls

Sewa pompa air 3" @ = / unit

Sewa Jack hammer @ = / jam

Sewa Jack hammer / hr @ = / hr

Sewa KLB balas (50 km) @ = / m3

Sewa Mesin las @ = / hr

Sewa Alat bor pile @ = / unit

Sewa perancah tipe II @ = / kg

Sewa Stamper @ = / hr

Sewa Compresor @ = / jam

sewa sandpot @ = / bh

Sewa Crawler Crane @ = / hr

Koordinasi @ = / ls

Sosialisasi @ = / ls

PT. / CV. ........................................

................................................

Pimpinan Perusahaan