Paket : 01-15 PST
Pekerjaan : Pembangunan Stasiun Tanjung beserta Pembangunan Peron Sedang dan Akses Jalan Masuk ke Stasiun Tanjung
1 Pekerja @ = / oh
2 Pekerja jaga @ = / oh
3 Tenaga bongkar @ = / oha. Pelaksana @ = / oh
a. Tukang @ = / oh
a. Tukang Kayu @ = / oh
b. Tukang Batu @ = / oh
c. Tukang Besi @ = / oh
d. Tukang Las @ = / oh
f. Tukang Cat @ = / oh
f. Tukang Gerinda @ = / oh
4 Kepala Tukang @ = / oh
5 Mandor @ = / oh
6 Pengawas @ = / oh
7 Juru Ukur @ = / oh
8 Juru Gambar @ = / oh
9 Operator @ = / oh
10 Operator komputer @ = / oh
11 Pembantu Operator @ = / oh12 Tenaga pelaksana @ = / oh
13 Tenaga ahli @ = / oh
14 Pekerja Khusus @ = / oh
1 Sewa Sheepfoot Rollers @ = / jam
1 Sewa Mesin gilas 8 - 10 ton @ = / jam
2 Sewa Buldozer TD.25 @ = / jam
3 Sewa Excavator PC. 1800 @ = / jam
4 Sewa Forklift @ = / hr
4 Sewa Dump truck 3.5 Ton @ = / jam
5 Sewa Dump Truck Kapasitas 5 ton @ = / jam
6 Sewa Vibrator roller @ = / jam7 Sewa Flat truck 18 Ton @ = / jam
8 Sewa Trailer 20 ton @ = / jam
9 Sewa Crane 20 Ton @ = / jam
10 Sewa Stamper @ = / jam
11 Sewa Theodolith dengan EDM @ = / unit
12 Sewa Water pass @ = / unit
1 BATU
Abu batu @ = / m3
Agregat klas A @ = / m3
Agregat klas B @ = / m3
Batu belah @ = / m3
Batu pecah/split 1/2 di quary @ = / m3
Batu pecah/split 2/3 di quary @ = / m3
Balas batu pecah di quary @ = / m3
Batu bata klas I @ = / bh
Batu Tempel @ = / m2
2 BESI BAJA
Asbes gelombang kecil 4mm 80x180 @ = / lbr
Asbes gelombang besar 5mm 80x180 @ = / lbr
Besi beton U 32 ulir @ = / bh
Besi beton U 39 ulir @ = / kg
Besi beton U 42 ulir @ = / bh
Besi beton U 24 polos @ = / kg
Besi IWF 300x150x6.5x9 pj. 12 m @ = / btg
Besi IWF 300x150x6.5x9 pj. 6 m @ = / btgBesi IWF 300x150x6.5x9 pj. 4+1 m @ = / btg
Besi IWF 150x50 x5x7 pj. 2 m @ = / btg
Besi IWF 150x50 x5x7 pj. 1 m @ = / btg
DAFTAR UPAH PEKERJA DAN HARGA BAHAN
A. UPAH
B. SEWA ALAT
C. HARGA BAHAN
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 2/8
siku 70.70.7 @ = / btg
siku 50.50.5 @ = / btg
Besi canal CNP, 150x50x3.2 pj. 6m @ = / btg
Besi canal c. 100x50x20x2 lisplang,sopi2 @ = / btg
Besi canal c. 100x50x20x2 tutup keong @ = / btg
Base plat, 20 mm @ = / btg
Base plat, 10 mm @ = / btg
Base plat, 6 mm @ = / btg
Plat 1.2 mm @ = / btg
Siku 50.50.5, ikatan angin, pjng 9.6 m @ = / btgSiku 50.50.5, ikatan angin, pjng 8 m @ = / btg
Besi beton 12 mm, ikatan angin, pjng 4.5 m @ = / btg
Besi beton 12 mm, trektang, pjng 1.2 m @ = / btg
Baut angker, dia 22 @ = / btg
Baut dia 16 HTB @ = / btg
Baut dia 12 @ = / btg
Begel talang @ = / btg
Pipa galvanis Ø 5", pj. 9 m @ = / btg
Pipa galvanis Ø 5", pj. 6 m @ = / btg
Besi Strip @ = / kg
Baut bantalan jembatan dia. 19-270 mm @ = / bh
Baut sindik diameter 19-270 mm @ = / bh
Begel rel bendel 19 mm @ = / bh
Baut mur @ = / bh
3 ASPAL Aspal @ = / kg
Residu / Ter @ = / ltr
Aspal Hotmix tebal 5 cm @ = / m2
Aspal Hotmix @ = / kg
4 KAWAT
Kawat Galvanis Ø 4 mm @ = / kg
Kawat pral @ = / kg
Kawat ikat dia. 5 mm @ = / kg
Kawat beton @ = / kg
Kawat las/elektroda @ = / kg
Kawat duri @ = / m
Kawat las @ = / kg
Elektroda pengerasan @ = / bh
5 KAYU
Kayu klas I @ = / m3
kayu klas II @ = / m3
Kayu Klas III @ = / m3
Kayu Klas IV @ = / m3
Kayu Kaso 4/6 @ = / m3
Dolken 8 - 10 cm @ = / btg
Bambu 8 - 10 cm @ = / btg
Papan @ = / m3
Formika @ = / lbr
Kayu bakar @ = / pkt
Kayu terenteng @ = / m3
Bambu Besar @ = / btg
Pohon Kelapa (glugu) dia. 25 cm pj. 6-8 m @ = / btg
Tripleks tebal 4 mm @ = / lbr
Tripleks tebal 6 mm @ = / lbrMultiplek 9 mm @ = / lbr
Multiplek 12 mm @ = / lbr
Multiplek 18 mm @ = / lbr
Jendela kaca naco @ = / set
Kayu ganjal @ = / bh
Pintu panel @ =
Jendela kaca naco @ =
kaca polos tebal 5mm @ =
Lem Putih Fox @ =
alumunium Foil @ =
list Kayu @ =
Rooster papan 20/20 @ =
List Kaca @ =
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 3/8
6 PAKU
Paku campur @ = / kg
Paku seng @ = / kg
Paku tirpon / TN @ = / bh
Paku Maskram @ = / kg
PASIR DAN TANAH URUG
7 Pasir pasang @ = / m3
Pasir urug @ = / m3Sirtu di quary @ = / m3
Tanah urug di Quary @ = / m3
Pasir beton @ = / m3
Gebalan rumput @ = / m2
BETON
8 Beton Readymix K.175 @ = / m3
Beton Readymix K.225 @ = / m3
Beton Readymix K.250 @ = / m3
Beton Readymix K.300 @ = / m3
Beton Readymix K.350 @ = / m3
Beton Readymix K.400 @ = / m3
SEMEN DAN KAPUR
9 Semen Portland @ = / zak
Semen Putih @ = / zak Semen Grouting @ = / kg
Semen Warna @ = / kg
Patok beton uk. 0,15 x 0,15 x 1,25 m (lengkung) @ = / bh
SENG/FIBER GLASS
9 Seng BJLS 25 @ = / lbr
Seng BJLS 30 @ = / lbr
Seng gelombang BJLS 28 @ = / lbr
Plat tutup seng 120 x 2400 x 1,5 @ = / lbr
Zinc alum atap,0.5 mm @ = / lbr
Zinc alum talang @ = / lbr
Zinc alum lisplang, 0.5 mm @ = / lbr
Zinc alum tutup keong @ = / lbr
GEOTEXTILE10 Geotextile (non woven) @ = / m2
Geotextile woven @ = / m2
11 PENAMBAT
Base Plate @ = /bh
Paku tirpon / TN @ = /bh
Rail Pad @ = /bh
Insulator @ = /bh
Penambat elastis @ = /bh
12 BAHAN PERPIPAAN BESI/PVC
a. Check valve 1/2 " @ = /bh
b. Double neuple 1/2" @ = /bh
c. Gate valve 1/2" @ = /bh
d. Pipa PVC dia. 1/2" (AW) @ = /btge. Pipa PVC dia. 3/4" (AW) @ = /btg
f. Pipa PVC dia. 1" (AW) @ = /btg
g. Pipa PVC dia. 1 1/4" (AW) @ = /btg
h. Pipa PVC dia. 2" (AW) @ = /btg
i. Pipa PVC dia. 3" (AW) @ = /btg
j. Pipa PVC dia. 4" (AW) @ = /btg
k. Pipa PVC dia. 10 " (AW) @ = /btg
l. Pipa Gip 2 1/2" Medium @ = /btg
m. Sambungan pipa PVC dia. 1/2" (AW) @ = /bh
n. Sambungan pipa PVC dia. 3/4" (AW) @ = /bh
o. Sambungan pipa PVC dia. 1" (AW) @ = /bh
p. Sambungan pipa PVC dia. 2" (AW) @ = /bh
q. Sambungan pipa PVC dia. 3" (AW) @ = /bh
r. Sambungan pipa PVC dia. 4" (AW) @ = /bh
s. Stop kran 3/4 " KIT @ = /bht. Talang PVC + Penggantung @ = /btg
u. Water mur 1/2" @ = /bh
v. Water mur 3/8" @ = /bh
w. Lem Paralon 1/2 Kg @ = /bh
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 4/8
BAHAN PENUTUP ATAP
a. Genteng plentong pres mesin ex. Jatiwangi @ = /bh
b. Genteng bubungan ex. Jatiwangi @ = /bh
c. Genteng Morando ex. Jatiwangi @ = /bh
d. Genteng bubungan Morando ex. Jatiwangi @ = /bh
e. Genteng Kanmuri @ = /bh
f. Genteng bubungan Kanmuri @ = /bh
g. Genteng Glazuur @ = /bh
BAHAN PLAFOND
a. Eternit asbes 4 mm ex.atrisco @ = /lbr
b. Eternit asbes biasa 4 mm ex.lokal @ = /lbr
c. GRC 4 mm ex. Atrisco @ = /lbr
d. GRC 4 mm ex. Lokal @ = /lbr
e. Gypsum 6 mm @ = /lbr
f. Gypsum 9 mm [ 120x240 ] @ = /lbr
g. Gypsum 12 mm @ = /lbr
h. List kamper 1 cm @ = /m'
i. List kamper 2 cm @ = /m'
j. List kamper 5 cm @ = /m'
k. List gypsum 8 x 8 x 200 cm @ = /m'
l. List gypsum 12 x 12 x 200 cm @ = /m'
m. List gypsum 5 x 5 x 200 cm @ = /m'
BAHAN LANTAI DAN PELAPIS DINDINGa. Keramik 10 x 20 KW I DN Putih/Polos @ = /m2
b. Keramik 20 x 20 anti selip (Km) KW I DN bercorak/berwarna Setara Roman @ = /m2
c. Keramik 20 x 25 (Km) KW I DN bercorak/berwarna Setara Roman @ = /m2
d. Keramik 30 x 30 KW I DN putih Setara Roman @ = /m2
e. Keramik 40 x 40 KW I DN Corak Setara Roman @ = /m2
f. Tegel PC 20 x 20 @ = /bh
g. Porselen 11 x 11 warna Standart DN @ = /m2
h. Lantai Keramik artistik 10x10 @ = /bh
i. Keramik 30 x 30 KW I DN putih Setara Roman @ = /bh
j. Keramik 30 x 30 KW I DN Warna / Motif @ = /bh
k. plint keramik 10 x 30 @ = /bh
l. Keramik lantai 20 x 20 KM @ = /bh
m. Keramik dinding 20 x 20 KM @ = /bh
n. Paving Blok @ = / m2
BAHAN PENGGANTUNG DAN KUNCI
a. Engsel Patron @ = /psg
b. Engsel Harmonika @ = /m'
c. Engsel jendela ring unilon 3" @ = /psg
d. Engsel pintu ring unilon 4" @ = /psg
e. Espagnolet/Grendel tanam @ = /bh
f. Grendel 15 cm @ = /bh
g. Grendel 5 cm @ = /bh
h. Hak angin jendela biasa @ = /bh
i. Kunci 2 slaag Kuda Terbang @ = /bh
j. Kunci 2 slaag tanam Anchor Standart @ = /bh
k. Kunci 2 slaag tanam Royal @ = /bh
l. Kunci KM bulat ALFA @ = /bh
m. Rel maraton 1 pintu @ = /unit
n. Rel Henderson @ = /unit
o. Sloot jendela tunggal (type per) @ = /bhp. Sloot Pintu Tanam (type per) @ = /bh
q. Tarikan Jendela / Handle @ = /bh
BAHAN ELEKTRIKAL
a. Box Zekering @ = /bh
b. Instalasi titik lampu/stop kontak @ = /ttk
c. Isolasi @ = /bh
d. Kabel NYA 1 x 1,5 Prima [ 50 meter ] @ = /bh
e. Kabel NYA 1 x 2,5 Prima [ 50 meter ] @ = /bh
f. Kabel NYM 3 x 1,5 Prima [ 50 meter ] @ = /bh
g. Kabel NYM 3 x 2,5 Prima [ 50 meter ] @ = /bh
h. Kabel NYY 3 x 4 Prima [ 50 meter ] @ = /bh
i. Lampu Pijar 5 Watt s/d 40 Watt @ = /bh
j. Lampu SL Phillips 25 Watt @ = /bh
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 5/8
k. Lampu TL Phillips 20 Watt @ = /bh
l. Lampu TL Phillips 40 Watt @ = /bh
m. Lampu Neon TL Phillips 20 Watt [Lengkap] @ = /bh
n. Lampu Neon TL Phillips 40 Watt [Lengkap] @ = /bh
o. Lampu Mercury 80 Watt @ = /bh
p. Lampu Taman 25 Watt [Tiang + Lampu 1 bh] @ = /bh
q. MCB 1 PHASE @ = /bh
r. MCB 3 PHASE @ = /bh
s. Saklar Broco tunggal standard @ = /bh
t. Saklar Broco seri standard @ = /bhu. Stop Kontak Broco standard @ = /bh
v. Stop kontak Broco 3 phase (Out Bow) @ = /bh
w. Stop kontak Broco 3 phase (In Bow) @ = /bh
x. Grounding @ = /bh
y. AC Split 1 PK @ = /bh
z. Mesin AC Split TOSHIBA (Indoor/Outdoor Unit) @ = /bh
aa. Timah @ = /kg
ab. Split Tembaga dia 1" @ = /bh
ac. Pipa Arde @ = /m'
ad. Kawat BC @ = /m'
af. Air Curtain @ = /unit
ag. Lampu gantung @ = /bh
ah. Lampu Downlight @ = /bh
BAHAN SANITAIR
a. Bak KM Fiber 60 x 60 @ = /bhb. Closet jongkok standard lengkap kw A @ = /bh
c. Closet duduk standard lengkap kw A @ = /bh
d. Urinal Lengkap @ = /bh
e. Asi Part Urinal (Pembatas) @ = /bh
f. Floor Drain @ = /bh
g. Kran bebek ITAP 3/4" @ = /bh
h. Kran stainlees lokal kait @ = /bh
i. Kran tembok ITAP 1/2" @ = /bh
j. Kran Wastafel @ = /bh
k. Mesin Pompa Air Jet Pump 150 watt @ = /bh
l. Mesin Pompa Air Jet Pump 250 watt @ = /bh
m. Pompa Dragon Asli @ = /bh
n. Saringan air lantai Km stainlees steel @ = /bh
o. Tangki air Fiber Glass 1 m3 @ = /bh
p. Tempat sabun keramik @ = /bhq. Wastafel Gantung [Lengkap ] @ = /bh
r. Jet Shower Closed @ = /bh
s. Jet Shower Mandi @ = /bh
t. Paper Holder/Tempat Tissue Gulung Toilet @ = /bh
ALAT - ALAT KERJA
11 Tambang manila @ = / kg
Senteleng bambu @ = / bh
kuas 3" @ = / bh
Mata bor kayu @ = / bh
Mata bor besi standard @ = / bh
Mata Bor rel R.54 @ = / bh
Gerinda batu api @ = / bh
Gagang martil @ = / bh
Sikat baja @ = / bh
Linggis songkel @ = / bhSikat bulu @ = / bh
Linggis bobok @ = / bh
Martil besar @ = / bh
Gergaji kayu @ = / bh
Mata Gergaji besi @ = / bh
Cetok/sendok aduk @ = / bh
Paselin @ = / kg
Kikir 1.5 " @ = / bh
PEKERJAAN PEMECOKAN DENGAN MEKANIK BERAT
12 Mesin MTT @ = / m'
Mesin PBR @ = / m'
Mesin VDM @ = / m'
LAIN - LAIN13 Ampelas @ = / lbr
Biaya pengawalan @ = / oh
Biaya angkut rel dengan KA / KLB @ = ton/k
Biaya angkut dengan KA / KLB @ = ton/k
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 6/8
Ongkos angkut dengan truck @ = / km
Ongkos muat bongkar rel R.42/R.54 @ = / ton
Oksigen @ = / tab
Oksigen (46 kg) @ = / tab
LPG (12 kg) @ = / tab
LPG (46 kg) @ = / tab
Logo Lambang PT. KAI @ = /ls
Logo Lambang Kemenhub @ = /ls
Papan Nama Stasiun @ = /ls
Regulator Oksigen @ = / bhRegulator LPG @ = / bh
Olie sae 30 - 40 @ = / ltr
Premium / Bensin @ = / ltr
Batu gerinda tangan @ = / bh
Batu gerinda piringan @ = /bh
Batu gerinda profil @ = / bh
Tenda Plastik 3x4 @ = / lbr
Solar @ = / ltr
Pipa PVC dia. 2" (type AW) 4 m @ = / m'
Karung plastik @ = / bh
Additive beton @ = / kg
Pohon Kelapa (glugu) dia. 25 cm pj. 6-8 m @ = / btg
Kain Lap / Majun @ = / bh
Kaca/naco polos tebal 5 mm - 70 cm @ = / lbr
Tebeng @ = / bh
Hand sain @ = / bhBendera merah / kuning @ = / bh
Plamir dinding @ = / kg
Cat kayu @ = /kg
Cat dasar @ = / kg
Cat tembok Luar @ = / kg
Cat dinding @ = / kg
Waterfroofing @ = / ltr
Kertas gambar @ = / m'
Ember @ = / bh
Cookes @ = / kg
Ongkos muat ke gerbong dengan loader @ = / m3
Ongkos bongkar balas dan ecer di lokasi @ = / m3
Ongkos angkut maksimum dari quary ke depo balas/tempat muat @ = / m3
Ongkos muat, angkut, ecer patok beton ke lokasi kerja @ = / bh
Pemasangan patok lengkung, termasuk gambar grafik busur @ = / bhPengecatan patok beton (1 x dasar, 2 x cat) @ = / bh
Roll cat @ = / bh
tempat muat
Zat asam @ = / btl
Ter @ = / kg
Bahan las thermit @ = / set
sarung tangan @ = / bh
Pahat Skrap @ = / bh
Pengadaan H-Beam 400 x 300 x 12 x 25 @ = / bh
Sewa H-Beam 500 x 300 x 16 x 28 / ton @ = / bh
Sewa H-Beam 200 x 200 x 8 x 12 / ton @ = / bh
Tilfor @ = / bh
Roller @ = / bh
Teflon @ = / m2
Cat Epoxy @ = / liter
Cat Zinkromate @ = / kgPolyurethane @ = / liter
Thinner no.1 @ = / liter
Thiner Polyurethane @ = / liter
Majun @ = / kg
Sabun Cream @ = / kg
Ampelas @ = /m
Patok rel pengaman jln.perlintasan & cor beton @ = / bh
Rambu lalulintas tanda STOP termasuk bahan @ = / bh
Rambu tanda "AWAS KERETA API", termasuk bahan @ = / bh
Rambu / tanda "Semboyan 35" termasuk bahan @ = / bh
Biaya ijin dan telex pemasangan Semboyan @ = / ls
Semboyan (2A, 2B, 2C dan 3) termasuk tiang @ = / bh
Lampu semboyan @ = / bh
Angkutan wesel lengkap @ = / bh
Grease (pelumas) @ = / ltr
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 7/8
ALAT BANTU, BONGKARAN DAN PERLENGKAPAN
14 Alat bantu @ = / Ls
Alat bantu pembuatan jalan sementara @ = / Ls
Alat bantu pembuatan jembatan sementara @ = / Ls
Alat bantu bongkar jembatan sementara @ = / Ls
Alat angkut material bekas jembatan sementara @ = / Ls
Alat bantu (lorry, balok, kawat, dll.) @ = / Ls
Alat bantu dokumentasi @ = / Ls
Alat bantu pasang gabion untuk penahan ballas @ = / Ls Alat bantu memasukan balas (pengki, gorekan,skop, dll) @ = / Ls
Alat bantu Pekerjaan HTT untuk angkatan @ = / Ls
Alat Bantu Muat / Bongkar Rel @ = / Ls
Alat bantu Pemasangan Bantalan Beton @ = / Ls
Alat bantu Pemasangan Bantalan Kayu @ = / Ls
Alat bantu pekerjaan rel @ = / ls
Alat bantu pembuatan block zoden @ = / Ls
Alat bantu pemindahan tiang listrik/telpon @ = / unit
Roll meter @ 50 m @ = / bh
Shop drawing untuk pengukuran topografi @ = / Ls
Utilitas investigasi @ = / Ls
Bongkar Direksi keet setelah pekerjaan selesai @ = / Ls
Transportasi pembersihan lokasi dari sisa pek. @ = / unit
Juru kamera @ = / ob
Bongkar tiang lama @ = / unit
Mendirikan tiang baru berikut cor @ = / unitPenyanggan sementara tiang baru dengan kawat @ = / unit
Mobilisasi dan demobilisasi alat berat @ = / unit
Jahit dan gelar geotextile @ = / m2
Test kepadatan tanah dasar @ = / unit
Test kepadatan tanah DCP dan CBR @ = / unit
Kaso 4 x 6 cm, cat dan paku untuk pengukuran @ = / Ls
Las Elektroda @ = / ttk
Bambu sedang @ = / btg
Ijuk @ = / kg
Saluran beton pracetak @ = / m'
Peralatan gambar lengkap @ = / set
Benang @ = / roll
Biaya pemboran untuk lubang bor pile D 0,6 m @ = / m'
Biaya pemboran untuk lubang bor pile D 1,0 m @ = / m'
Loading test @ = / unitBiaya pek. Waterprofing/railing/m @ = / Ls
Material waterprofing/railing @ = / Ls
Bantalan Elastomer T.1 @ = / unit
Upah pengadaan dan pasang elastomer/unit @ = / unit
Material Elastomer jembatan T.2 @ = / unit
Galian dan angkat kabel CTC dan urug kembali @ = / Ls
Gali dan gelar kabel CTC dan urug kembali @ = / Ls
Sambung kabel dg lasmof dan tambah kabel CTC @ = / Ls
Relokasi tiang sinyal 2 aspek dan bahan @ = / Ls
Mobilisasi dan demobilisasi pemindahan kabel @ = / Ls
Bantalan Elastomer T.3 @ = / unit
Penerangan dan perlengkapan direksi keet @ = / Ls
Keamanan lingkungan @ = / Ls
Biaya akomodasi petugas pengawalan KA @ = / Ls
Pembongkaran kisdam @ = / m2
Biaya pengujian tanah @ = / LsSewa Blander potong / hr @ = / hr
Sewa Blander potong @ = / jam
Dongkrak Pal @ = / hr
Katrol kapasitas 10 ton @ = / hr
Biaya Operasi MTT @ = / m
Biaya Operasi PBR @ = / m
Biaya Operasi VDM @ = / m
Biaya Sewa MTT @ = / m
Biaya Sewa PBR @ = / m
Biaya Operasional MTT & PBR @ = / m
Biaya Operasional MTT & PBR track gongsol @ = / m
Membongkar perlintasan @ = / unit
Perlengkapan alat kerja las thermit @ = / hr
7/25/2019 Upah Bahan Bangunan Stasiun Paket 01-15
http://slidepdf.com/reader/full/upah-bahan-bangunan-stasiun-paket-01-15 8/8
Transportasi alat las thermit @ = / hr
Pengamanan Operasi las thermit @ = / hr
drip perusut @ = / kg
kul mesin sleep @ = / bh
kaca mata blander @ = / bh
kaca mata sleep @ = / bh
Mata Gergaji besi standart (p = 18") @ = / bh
Masker Las @ = / bh
meteran 2 m @ = / bh
meteran 5 m @ = / bhnozel 10 -25 @ = / bh
selang angin @ = / m
selang elpiji @ = / kg
selang zat asam @ = / kg
seng untuk mal @ = / kg
sumbat telinga @ = / bh
Reamer @ = / bh
steel great @ = / kg
sarung tangan pendek @ = / bh
Perancah @ = / kg
Sewa Pick Up / bln @ = / Bln
Sewa motor @ = / Bln
Sewa Mesin gerinda MP 12 @ = / hr
Sewa Mesin gerinda tangan @ = / hr
Sewa Mesin Weldshear manual @ = / hr
Sewa alat ukur pembuatan shop/Asbuilt drawing @ = / LsSewa concreete pump @ = / jam
Sewa trimy @ = / Ls
Sewa pompa air 3" @ = / unit
Sewa Jack hammer @ = / jam
Sewa Jack hammer / hr @ = / hr
Sewa KLB balas (50 km) @ = / m3
Sewa Mesin las @ = / hr
Sewa Alat bor pile @ = / unit
Sewa perancah tipe II @ = / kg
Sewa Stamper @ = / hr
Sewa Compresor @ = / jam
sewa sandpot @ = / bh
Sewa Crawler Crane @ = / hr
Koordinasi @ = / ls
Sosialisasi @ = / ls
PT. / CV. ........................................
................................................
Pimpinan Perusahaan