Post on 07-Jul-2015
description
Your Right CAD Designer
Reyasat CAD Designer
SECTION AT B-B
AC
H
JEDB G
FK L
2"x4"GROVE
O H W TANKPARAPET WALL
LEV.±0'-0"
LEV.+3'-0"
LEV.+13'-6"
LEV.+24'-0"
LEV.+26'-6"
LEV.+28'-4"
PERGOLA WOODEN
R.C.C SLAB
R.C.C BEAM
R.C.C SLAB
R.C.C BEAM
12" SUNK SLAB
BATH DRESS
BATH DRESS
LOUNGE
LOUNGE
LOBBY
TERRACE
OPEN PERGOLA WOODEN
PLATFORM
EARTH FILLING6" TH. STONE SOLING4" TH.C.C. BED2" TH.FLOOR FINISH
DPC
2"x4"GROVE
DPC
(SCALE,1/8"=1'-0")
2"TH.F.FINI.
4"TH.C.C.BED
6"STONE SOLING
EARTH FILING
PARAPET WALL
3'
RCC BEAM
RCC SLAB
RCC SLAB
O.H.W.TANK
STAIR CASE
LOUNGE
LANDING
PASS.
RCC BEAM
RALING
21
'-6
"
11
'1
0'-6
"
5'-6
"7
'5
'3
'-6
"2
'-6
"4
'-6
"
6"
LEFT SIDE ELEVATION
AC
H
JEDB G
FK L
O H W TANKPARAPET WALL
LEV.±0'-0"
LEV.+3'-0"
LEV.+13'-6"
LEV.+24'-0"
LEV.+26'-6"
RIGHT SIDE ELEVATION
AC
H
JE D BG
FK
O H W TANK PARAPET WALL
LEV.±0'-0"
LEV.+3'-0"
LEV.+13'-6"
LEV.+24'-0"
LEV.+26'-6"
L
LEV.+28'-4"
LEV.+1'-0" LEV.+2'-6"
LEV.+28'-4"
PERGOLA WOODEN
PERGOLA WOODEN
PERGOLA WOODEN
2"x4"GROVE
2"x4"GROVE
2"x4"GROVE
2"x4"GROVE
2'
3'11
'
2'-6"6"
1'-1
0"
2'-1
"
5'-6
" 7'- 6"X9'-7"
2'-1"
2'-1
"2'
-1"
2'-1" 2'-1" 2'-1"
1'5'-6"
13'- 0"X11'-0"TERRACE
1'
BATH
7'- 6"X9'-7"BATH
BED ROOM
W/R
14'- 0"X15'-6"
TERRACE
VOID
15'- 0"X13'-10"BED ROOM
VOID
VOID
W/R
DN
2'-6"6"
BATH8'- 0"X10'-0"
BED ROOM16'- 0"X14'-0"
3' 3'
5'-6
" 8'- 0"X5'-0" 6'- 0"X5'-0"
3'-6"1'5'-6"
2'6"
6"2'W/RW/R9'
11'
8'-6
"1'
8'5'-6"
18'- 0"X16'-0"BED ROOM
6"6" 2'-6"
2'1'-6"2'
2'-6"
9'
DRESSDRESS
BATH6'- 0"X8'-6"8'- 0"X8'-6"
BATH
2'-1
"
2'-1
"
2'-1"
2'-1
"2'
-1"
2'-1" 2'-1" 2'-1"
2'-1
"
8' 2' 5'-6"5'-6"8'
1'-1
0"
W/R1'
2'-6
"
7'-5
"2'
1'-6
"6'
-6"
2'
6"3'
-6"
8' 3'-5" 3'-6" 6"
8'3'
-9"
3'-1
0"
8'- 0"X7'-1"DRESS
3'-6" 2'-11"
4'
DRAWING TITLE MUHAMMED ASLAM RANA
ARCH
ITECTU
RE &
M.P.C.A.T.P, I.A.P
B.Arch(N.C.A)
IN
TERIO
RD
ESIG
N
Phase-V Ext., D.H.A, Karachi.
Badar Commercial Area
Plot No.5C,12th Street
CONSULTANTSMezzinine Floor
Ph: 5841006 Fax (92-21) 5841006
Cell 0320-4244256 E-mail: usamaak@go4b.net
THEUSAMA AMIR KHAN
Mobile: 0320-4244256
FIRST FLOOR PLAN
DRAWN DATE
CHECKED scale
Reyasat Khan
USAMA.A.K
08-SEPT.06
1/8"-1'-0"
CLIENT
KH-E-SEHAR PH-VIPROJECT
RESIDENCE PLOT NO-92 / II
2'2'
15'-9"
A
A
C
9'
E
D
B
5'-6
"2
'1
'
7'
15'
1
'
1
'
1
'
1
'
1
'
1
'
1
'
1
'
FAMILY LOUNGE17'- 6"X22'-0"
12'-4"
LAWN
3'
12'-4
"
7"
H
J
2'-3
"4
'-3
"
G
F
11
'-6
"7
'-6
"1
0'
K
L
1'-4
1 4
"
8'-6
"
9'-1"
1
4
'
-
5
3
4
"
VO
ID
16'-6"5'-3"
6'-4
"
45° OPEN
2'
8'
21"
21"21"
21"
TERRACE
2'2' 8'
45°
1
'
1 2 3 4 5 6
7'-6"
9 10
4' 3'-9" 8'-3" 6'-9" 7' 8'-6"
7
2'-6" 7'
8
3'-3"
11
U.G.W.TANK
27'-4"X38'-8"
HALL
LIFT
4'-0"X5'-0"
UP
8" T
HIC
K
R.C
.C
W
ALL
8" T
HIC
K
R.C
.C
W
ALL
8" THICK
R.C.C WALL
LEV.-6'-0"
BASEMENT PLAN
SCALE:1/8"=1'-0"
16'-0"X13'-6"
SHOWROOM
LIFT
4'-0"X5'-0"
UP
27'-6"X13'-0"
SHOWROOM
12'-0"X25'-0"
15'-6"X25'-6"
SHOWROOM
SHOWROOM
16'-0"X12'-0"
SHOWROOM
GROUND FLOOR PLAN
SCALE:1/8"=1'-0"
LEV.+3'-0"
LEV.Ñ0'-0"
RO
AD
M.H
3' WIDE PROJECTION
UP
UPUP
UP
UP
3' W
ID
E P
RO
JE
CT
IO
N
M.H
MAIN SEWERAGE
LINE
5'-9"X14'-0"
D/BATH
6'-0"X8'-6"
BATH
3'-0"X8'-6"
POWER RM.
15'-6"X17'-4"
LOUNGE
12'- 0"X16'-0"
BED ROOM
BED ROOM
14'- 0"X14'-0"
D/ DINING
12'-0"X13'-6"
8'-0"x13'-0"
KITCHEN
BATH
8'-0"X8'-0"
DU
CT
13'-0"X13'-0"
BED ROOM
UP
DN
4'-0"X5'-0"
LIFT
6'-0"X7'-0"
BATH
TERRACE
BED ROOM
18'-6"X12'-0"
LOBBY
7'-3"X5'-6"
8'-8"X8'-6"
LEV.+15'-6"
TYPICAL FLOOR PLAN
SCALE:1/8"=1'-0"
DN
LIFT MACHINE
O.H.TANK
ROOF
LEV.+56'-0"
PARAPET
WALL
ROOF PLAN
SCALE:1/8"=1'-0"
BASEMENT PLAN SITE PLAN
SCALE:1/8"=1'-0"SCALE:1/8"=1'-0"
2064. S.FT.
MA
IN
W
AT
ER
SU
PP
LY
LIN
E
MAIN WATER
SUPPLY LINE
Ist./2nd/3rd & 4th Floor
SCALE:1/8"=1'-0"
147. S.FT.
BLOCK PLAN OF STAIR TOWER
& LIFT MACH
SCHEDULE OF AREA
TOTAL AREA OF PLOT 40'-0"X45'-0" = 200.00 SQ.YD. APP
ALLOWABLE AREA OF THE PLOT 100% =1800.0 SQ.FT (FULL)
=1800.00 SQ.FT.
SUBMISSION DRAWING
LIC. ARCHITECT
DRAWN
PROPOSED PLAN ON PLOT NO:32-C
D.H.A, KARACHI
MR.M.Faisal Mukhtar
RAHAT LANE-1 PHASE - VI
OWNER
USAMA.A.K
CHECKED
AS SHOWN
SCALE
DATE
TOTAL = 1774.00 SQ.FT
TOTAL
(1774.00 X 2 +2064X4)
GROUND+BASEMENT+(TYPICALX4)
LIC. STRUCTURAL ENG.
FRONT ELEVATION
SCALE:1/8"=1'-0"
SECTION-A.A
SCALE:1/8"=1'-0"
BED ROOM
BED ROOM
BED ROOM
BED ROOM
D/ DINING
D/ DINING
D/ DINING
D/ DINING
LIFT M/C ROOM
PARAPET WALL
R.C.C SLAB
R.C.C BEAM
R.C.C SLAB
R.C.C BEAM
R.C.C SLAB
R.C.C BEAM
R.C.C SLAB
R.C.C BEAM
REYASAT
TOWER
PROPOSED AREA = 11804.00 SQ.FT.
DETAIL OF AREA
A=40'-0"X45'-0" =1800.00 SQ.FT
GROUND FLOOR
MINUS CHAMFER
= 6'-0"X6'-0" =18.00 SQ.FT
2
= 4'-0"X4'-0" =8.00 SQ.FT
2
TYPICAL FLOOR
B=43'-0"X48'-0" =2064.00 SQ.FT
TOTAL = 2064.00 SQ.FT
BASEMENT FLOOR
C=40'-0"X45'-0" =1800.00 SQ.FT
TOTAL = 1774.00 SQ.FT
MINUS CHAMFER
= 6'-0"X6'-0" =18.00 SQ.FT
2
= 4'-0"X4'-0" =8.00 SQ.FT
2
TOTAL COVERD AREA = 11804 SQ.FT
SCHEDULE OF R.C.C COLUMN
R.C.C COLUMNS (8"X24")
R.C.C BEAMS(6"X36")
2-5/8" Ï BOTT 2-1/2"Ï @TOP
6-5/8" ß BARS
1/4" Ï BARS@6"C/C RINGS
R.C.C SLAB (6"TH)
3/8" Ï @ 8"C/C(S/W)
3/8" Ï @ 10"C/C(L/W)
P.L
R.L
6-5/8" Ï BAR
1/4" Ï@6C/C
1/2" Ï@6"C/C
BOTH WAYS
P.L
R.L
8"
R.L
P.L2" TH D.P.C
6"TH BLOCK
MASONRY
2'
DET. OF RCC COLUMN
DET. OF 6" TH WALL
BB
LEV+3'-0"
P.L
R.L
SECTION B-B
STAIR TOWER
=10'-6"X14'-0" = 147 SQ.FT
SEC OF U.G.WATER TANK
SEC. OF O.H.W.TANK
ROOF
U.G.W.TANK
02/06/2007
A
BC
LEV. Ñ0'-0"ROAD
LEV+16'-0"
LEV+26'-0"
LEV+36'-0"
LEV+46'-0"
LEV+56'-0"
LEV+3'-0"
LEV+63'-6"
LEV. Ñ0'-0"ROAD
LEV+16'-0"
LEV+26'-0"
LEV+36'-0"
LEV+46'-0"
LEV+56'-0"
LEV+3'-0"
LEV+63'-6"
DN
DUCT
M.H
MAIN SEWERAGE
LINE
14
'-0
"
10'-6"
PARAPET
WALL
LEV.+56'-0"
SCHEDULE OF JOINERY
1 - DOORS :- NOT LESS THAN = 2'-6"x7'-0"
2 - WINDOWS :- NOT LESS THAN = 4'-0"x4'-0"
3 - VENTILATORS :- NOT LESS THAN = 2'-0"x2'-0"
SCALE:1/4"=1'-0"
SCALE:1/4"=1'-0"
GROUND FLOOR
SHOWROOM
BASEMENT
HALL
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
ROOF
& TOWER
TYPICAL BLOCK PLAN
SERVANT ROOM-01
21'-0"X9'-2"
LOBBY
SERVANT ROOM-02
15'-6"X15'-0"
HALL
LOBBY
STORE
5'-8"X18'-6"
A
A
B
B
UP
D
D
LEV.+3'-0"
21'-9"x14'-0"
G.BED ROOM
21'-9"x18'-0"
MASTER SUIT
MAIN GATE
2
3
'
-
3
"
x
1
9
'
-
6
"
L
O
U
N
G
E
PATIO
LAWN
DN
11'-9"x10'-6"
BATH
D
N
2
2
'
-
0
"
x
2
2
'
-
0
"
D
R
A
W
I
N
G
14'-3" x 15'-6"
DINING
1
1
'
-
6
"
x
1
0
'
-
0
"
L
O
B
B
Y
HOT
KTCHEN
9'-6"x8'-0"
LOBBY
KITCHEN
21'-0"X11'-8"
9'-6"x5'-0"
POWDER
9'-6"x5'-0"
LAUNDRY
L
E
V
.
+
4
'
-
0
"
LOBBY
10'-3"X26'-8"
E
N
T
.
S.WC
5'-0"X3'-6"
DN
13'-6"x16'-3"
SITTING
9'-0"x12'-3"
BATH
8'-10"x12'-3"
W/DRESS
PATIO
D
N
SWIMMING POLL
PATIO
C
B
C
B
UP
4'-0"x3'-6"
FILTRATION
PLANT
4'-0"x3'-6"
CHANGING
ROOM
A
A
14'-0"x9'-0" x 9'-0"
U.G TANK
GUARD6'-8"x7'-0"
B
B
LEV.+1'-6"
LEV.Ñ0'-0"
D
D
E
E
21'-9"x14'-0"
BED ROOM
21'-9"x18'-0"
MASTER SUIT
2
3
'
-
3
"
x
1
9
'
-
6
"
L
O
U
N
G
E
DN
14'-0"x10'-6"
D/BATH
D
N
24'-4"x21'-4"
BED ROOM
V
O
I
D
9'-6"x23'-0"
LOBBY
LOBBY
11'-8"X26'-5"
13'-6"x16'-3"
SITTING
7
'
-
0
"
x
1
3
'
-
6
"
B
A
T
H
7'-5"x10'-6"
KITCHEN
TERRACE
1
1
'
-
8
"
x
1
5
'
-
0
"
B
A
T
H
21'-0"x14'-8"
BED ROOM
W
R
7
'
-
0
"
x
8
'
-
0
"
S
T
O
R
E
VOID LOOKING
DOWN
C
B
C
B
9'-0"x12'-3"
BATH
8'-10"x12'-3"
W/DRESS
C
B
C
B
DN
C
B
A
A
B
B
UP
D
N
TERRACE
V
O
I
D
A
A
B
B
D
N
12'-3" x 9'-0" x 4'-0"
O/H TANK
MAIN GATE GUARD6'-8"x7'-0"
ROAD LEVEL
Ñ0'-0"
A
A
B
B
ROAD LEVEL
Ñ0'-0"
6"X6" WATER CHANNEL
ROAD LEVEL
Ñ0'-0"
R
A
M
P
M A
I N
G
A
T
E
UP
RAMPUP
ROAD LEVEL
Ñ0'-0"
SERVANT ROOM-01
SWIMMING POLL
LOBBY
BED ROOM
LOBBY
BED ROOM
O/H TANK
R.C.C BEAM
R.C.C BEAM
R.C.C BEAM
R.C.C BEAM
GROUND FLOOR
FIRST FLOOR SLAB
ROAD LEVEL
Ñ0'-0"
+3'-0"
ROAD LEVEL
Ñ0'-0"
STORE
S I T T I N G
L O B B Y
L O B B Y
S I T T I N G
L O B B Y
H E L L
ROAD LEVEL
Ñ0'-0"
ROAD LEVEL
Ñ0'-0"
ROAD LEVEL
Ñ0'-0"
ROAD LEVEL
Ñ0'-0"
Architecture & Interior
Drawn
Drg. No.
Checked
Date
Scale
Job No.
Title
BGT/01002/01
Elevation & DetailsDesk With Side Rack
1" = 1'-0"
No. Date Revision
July, 2001
Architecture & Interior
Drawn
Drg. No.
Checked
Date
Scale
Job No.
Title
BGT/01002/01
Elevation & DetailsDesk With Side Rack
1" = 1'-0"
No. Date Revision
July, 2001
Interior LayoutSCALE: 3/8" = 1'-0"
BATH -2 GROUND FLOOR -USER BOY OF 11 YEARS
URINAL FIXING DETAIL - E
500
W.H.B. FIXING DETAIL - B
150 x 150 Non Skid
Ceramic Floor Tiles
Wash Hand Basin
83
0
Ceramic Tiles
150 x 150 Glazed
Mirror
500
150 x 150 Non Skid
Ceramic Floor Tiles
770
92
0
Ceramic Tiles
150 x 150 Glazed
680
Urinal
15mm Dia Flexible
550
Pipe
Partition
Soap Tray
150 x 150 Glazed
Ceramic Tiles
525 900
W.H.B. FIXING DETAIL - C
830
600
Mirror
500
Mirror
600
URINAL ELEVATION DETAIL - D
750
15 mm dia Flexible Pipe
150 x 150 Glazed
Ceramic Tiles
150
0
Urinal
750
Urinal
W. C. FIXING DETAIL - A
Ceramic Tiles
150 x 150 Non Skid
1500 (150 x 150 G
lazed C
eram
ic T
iles)
1240
300
Block Wall
200 Thick Hollow
notes:1. all dimension should br confirmed at site prior to
construction.
RevisionNo.
20-03-2003
Date
structural consultants: Consultech
advance copy
drawing no:
orignal size:
advisor:
revision no:
north:
00
30" x 20"
A-02
scale: 3/16"=1'-0"
date: March 2003
project architect: Farhan Zia
project: Renovation of Muhammadi Masjid
title: ground floor plan
at Karachi Gymkhana
Arshad Shahid Abdullah (pvt.) Ltd.
electrical consultants:
plumbing consultants:
mechanical consultants:
contractor
drawing status
Tender Document
client: Mr. Yahya Chawla
projec no: M-03/2003 M-03/2003projec no:
Mr. Yahya Chawlaclient:
Tender Document
drawing status
contractor
mechanical consultants:
plumbing consultants:
electrical consultants:
Arshad Shahid Abdullah (pvt.) Ltd.
at Karachi Gymkhana
ground floor plantitle:
Renovation of Muhammadi Masjidproject:
Farhan Ziaproject architect:
March 2003date:
3/16"=1'-0"scale:
A-02
30" x 20"
00
north:
revision no:
advisor:
orignal size:
drawing no:
advance copy
Consultechstructural consultants:
Date
20-03-2003
No. Revision
construction.1. all dimension should br confirmed at site prior tonotes:
notes:1. all dimension should br confirmed at site prior to
construction.
RevisionNo.
20-03-2003
Date
structural consultants: Consultech
advance copy
drawing no:
orignal size:
advisor:
revision no:
north:
00
30" x 20"
A-02
scale: 3/16"=1'-0"
date: March 2003
project architect: Farhan Zia
project: Renovation of Muhammadi Masjid
title: ground floor plan
at Karachi Gymkhana
Arshad Shahid Abdullah (pvt.) Ltd.
electrical consultants:
plumbing consultants:
mechanical consultants:
contractor
drawing status
Tender Document
client: Mr. Yahya Chawla
projec no: M-03/2003M-03/2003projec no:
Mr. Yahya Chawlaclient:
Tender Document
drawing status
contractor
mechanical consultants:
plumbing consultants:
electrical consultants:
Arshad Shahid Abdullah (pvt.) Ltd.
at Karachi Gymkhana
ground floor plantitle:
Renovation of Muhammadi Masjidproject:
Farhan Ziaproject architect:
March 2003date:
3/16"=1'-0"scale:
A-02
30" x 20"
00
north:
revision no:
advisor:
orignal size:
drawing no:
advance copy
Consultechstructural consultants:
Date
20-03-2003
No. Revision
construction.1. all dimension should br confirmed at site prior tonotes:
Your Right CAD Designer
Thanks youFor more details please contact me
Skype----> reyasatcadContact No---> 00971 50 2891683Email--------> reyasatsaleem@gmail.comEmail--------> reyasat@ymail.com