Indonesia Hydropower Potential &
Current Status
of
H dro ower
Develo ment
• Hydropower potential study (1983) has identified 1,249
oca on w o a capac y o , . ev ew s u y
1999) identified 21,480 MW passed the 3rd screening.
• , ,
MW ( 89 location ) plan to develope for the next 15 years. PLN
propossed 4,425 MW ( 35 %) as an IPP schemes.
• Current status of Hydropower development 3,762 MW in
operation. ( 5 % of the potential, excluding own use
y ropower y pr va e nves or• 552 MW total capacity of Mini hydropower development by
,
MW in operation ) and 217 MW under PPA preparation.
8/9/2019 Mochamad Sofyan
3/11
Hydro Power Potential Map
(HPPS 1983: 75.000 MW)
ACEH:5.062 MW
KALSELTENGTIM:16.844 MW
:3.808 MW
SUMBAR & RIAU:
3.607 MW
KALBAR:4.737 MW
SULUTTENG:3.967 MW
MALUKU:430 MW
PAPUA:.
SUMSEL, JAMBI,
BENGKULU & LAMPUNG:3.102 MW JATENG:
813 MW
SULSELRA:6.340 MW
3
JABAR:2.861 MW JATIM:
525 MWBALI NUSRA:
624 MW
8/9/2019 Mochamad Sofyan
4/11
PLN Plan & PolicPLN Electricity Development Plan (2011 ‐2020 )
2020
• The electricity demand growth by 8.5 %
annually, supplied by various energy11%8%
Non‐ReNEW Hydro Geothermal
GasLNGresources. Fossil power plant remaindominant ( 81 % ), mainly Coal Steam
Coal
.
• Share of renewable energy will increase
from 11 % ( 2011 ) to be 19 % ( 2020).
81%
HSD MFO
• To reduce oil consumption from 21 % (
2011) to 5 % by 2013.5,583 6,877
4,971
5,941
7,164
6,436
5,034 4,882
6,000
7,000
8,000
,
Geothermal
Hydro
• eve opmen o renewa e energyresources will be first priority.
Hydropower and“ Hydro Pump Storage
4,271
4,181
2,000
3,000
4,000
,
Power Plant“ as peaking plant.
4
‐
1,000
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
PL TU PL TA PL TP PL TGU PL TG PL T Lain T otal
8/9/2019 Mochamad Sofyan
5/11
Renewable Energy Development Plan
• The utillisation of Renewable Energy has been planned, mainly hydro power :
5,722 MW, geothermal : 6,247 MW and other small RE ( 253 MW ).
5
, ,
Green energy expected from IPP.
8/9/2019 Mochamad Sofyan
6/11
Hydropower Development Program 2011‐2020
1102
9681000
MW West Indonesia East Indonesia Java ‐ Bali
493
405450
600
0 0
9577 62
132
0 029
254
78 93
43
252
145
235
296
119
9 468
18
257
370
200
COD / Capacity ( MW )
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Region 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020Grand
Total
West Indonesia 0 0 95 77 62 493 405 132 0 0 1264
6
as n ones a
Java ‐ Bali 9 4 68 18 257 1102 37 0 450 968 2914
Grand Total 38 258 241 188 362 1847 587 367 746 1087 5722
8/9/2019 Mochamad Sofyan
7/11
Hydropower Pump Storage Power Plant
To meet the electricity demand during the peak load in Java-Bali system, a total
,
years, consist of:
Upper Cisokan P/S : 1,040 MW ( pre-construction stage, expected COD:
Matenggeng P/S : 900 MW ( expected COD : 2019/2020 )
Grindulu P/S : 500 MW ex ected COD : 2020
75,5 m height of upper dam and 98 m height of lower dam will be build using
RCC dam for Upper Cisokan P/S . 4 units of adjustable speed pump turbine and
enerator will be install in the under round owerhouse.
Pump Srorage with capacity of 400 MW in Sumatera and 800 MW Sea water
Pump Storage in East Java has been identified for future study
7
8/9/2019 Mochamad Sofyan
8/11
Implementation Schemes for IPP participation
Government Regulation no 14/2012, MEMR Decree no 04/2007:
The project should be listed in “General Plan of Electricity Development “ (RUPTL)
“ “
MEMR Decree no 04/2007 ) as far as no others Developer at a certain proposedproject location.
.
President Regulation no. 56/2011 jo no. 13/2010 concerning Public Private Partnership (
PPP ) :
Solicited Project (listed in RUPTL) or unsolicited ( not listed in RUPTL ).
The Project listed in the PPP Book
Procurement process through competitive bidding with “ right to match” for the
Project Iniciator.
8
Pre qualification required.
8/9/2019 Mochamad Sofyan
9/11
Regulation for Feed‐in Tariffs ( FIT )
.
capacity has been issued :
656 IDR /Kwh for Mini hydro in Jawa Bali system (connected to
medium
voltage
line,
with incentive factor
of
1.2
– 1.5
for
outside
Java‐Bali)
,
waste and 1050 IDR/Kwh for zero waste power plant in Jawa and
Sumatera system
(connected
to
medium
voltage
line,
with
incentive factor of 1.2 – 1.3 for outside Java‐Sumatera)
It’s also applied for excess power energy transaction.
ar
g er
an
:
o
mec an sm an
su ec
o approval
Pre aration of FIT for solar PV and Wind Power on ro ress.
9
FIT for small and medium scale RE aims to accelerate and attract
private investor
on
RE
development.
8/9/2019 Mochamad Sofyan
10/11
Summary and Conclusion
To meet electricity demand, a total of 5.7 GW new additional hydropowerplant has been planned for the next ten years and 20% expected to be
developed by private ( IPP ).
Indonesia has abundant hydropower potential, as for supporting the
energy conservation policy , development plan as a peak power plant willreduce oil consum tion.
PLN has identified a total of 12.9 GW of hydropower plant for the next
15 years development and 35 % propossed to be developed by IPP.
FIT for small and medium scale renewable energy ( RE ) will acceleratethe development of renewable energy and attract private participation.
10
.
8/9/2019 Mochamad Sofyan
11/11
Terima asiherima asiherima asiherima asiherima asiherima asiherima asiherima asih
11