OWNER CM CONSULTANT Project : THE PAKUBUWONO HOUSE KONTRAKTOR PELAKSANAJl. Pakubuwono VI, Kebayoran Baru
THE PAKUBUWONO DEVELOPMENT Jakarta Selatan
PROPOSAL COVER SHEETDate : 12-Nov-12 No : /MS/TPHs/AI/XI/12Raised to : PT JAYA CM (MK) Submission Date : 12-Nov-12
Attn. Bapak Heru Purwadi Requested :Subject : Metode Kerja Perbaikan Posisi Voute Balok Lt.3 Return Date :
as S.C/ (S.6 -S.7) Total page(s) include this page :
CONSTRUCTION METODE STATEMENT & CALCULATION
METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS S.C/ (S.6 – S.7)
PT. ACSET INDONUSA
Notes :For Approved
Dengan hormat,
Demikian kami sampaikan, atas perhatiannya kami ucapkan terima kasih.
Mengetahui disusun oleh,
Kurniadji Purwoko Sonny Hendrawan J. ReinaldiProject manager Engineering Manager Construction Manager
Revision Reviewed By Approved By
R0Heru Purwadi
Comment :
Date : Approved by Project Director :
Bersama ini kami kirimkan Metode Kerja Perbaikan Posisi Voute Balok Lt.3 as S.C/ (S.6 -S.7) untuk pelaksanaan pekerjaan di lapangan. Mohon untuk segera direview, sehingga kami dapat segera melaksanakan pekerjaan di lapangan.
Replied By : Signature :Signature :
METHODE KERJA
THE PAKUBUWONO HOUSE
Revision Date Prepared Checked Approved Authorizedby by by by
R0 11/12/2012
METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS (S.C/ (S.6 – S.7)
METHODE KERJA
THE PAKUBUWONO HOUSE
Revision Date Prepared Checked Approved Authorizedby by by by
R0 10/11/2012
METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS (S.C/ (S.6 – S.7)
OWNER CM CONSULTANT Project : THE PAKUBUWONO HOUSE KONTRAKTOR PELAKSANAJl. Pakubuwono VI, Kebayoran Baru
THE PAKUBUWONO DEVELOPMENT Jakarta Selatan
PROPOSAL COVER SHEETDate : 11 Oktober 2012 No : /MS/TPHs/AI/X/12Raised to : PT JAYA CM (MK) Submission Date : 11 Oktober 2012
Attn. Bapak Heru Purwadi Requested :Subject : Metode Kerja Perbaikan Posisi Voute Balok Lt.3 Return Date :
as S.C/ (S.6 -S.7) Total page(s) include this page :
CONSTRUCTION METODE STATEMENT & CALCULATION
METODE KERJA PERBAIKAN POSISI VOUTE BALOK LT.3 AS S.C/ (S.6 – S.7)
PT. ACSET INDONUSA
Notes :For Approved
Dengan hormat,
Demikian kami sampaikan, atas perhatiannya kami ucapkan terima kasih.
Mengetahui disusun oleh,
Kurniadji Purwoko Sonny Hendrawan J. ReinaldiProject manager Engineering Manager Construction Manager
Revision Reviewed By Approved By
R0Heru Purwadi
Comment :
Date : Approved by Project Director :
Bersama ini kami kirimkan Metode Kerja Perbaikan Posisi Voute Balok Lt.3 as S.C/ (S.6 -S.7) untuk pelaksanaan pekerjaan di lapangan. Mohon untuk segera direview, sehingga kami dapat segera melaksanakan pekerjaan di lapangan.