BAB IIIURAIAN HASIL PRAKTIKUM

1. SondirSondir - Pengolahan Data

Proyek : Sondir Sondir No :Lokasi : Lapangan Depan Hanggar Aer Elevasi :Dikerjakan oleh : Kelompok B3 MAT :

Tanggal : 6-Feb-13

Depth Cw Tw Kw qc LF LF x 20 cm JHP Fr(m) (Tw - Cw) (kg/cm) (kg/cm) (%)

0 0 0 0 0 0 0 0 00.2 0 0 0 0 0 0 0 00.4 5 9 4 5 0.36 7.20 7.20 7.200.6 9 12 3 9 0.27 5.40 12.60 3.000.8 8 10 2 8 0.18 3.60 16.20 2.251 9 12 3 9 0.27 5.40 21.60 3.00

1.2 9 12 3 9 0.27 5.40 27.00 3.001.4 9 12 3 9 0.27 5.40 32.40 3.001.6 16 30 14 16 1.26 25.20 57.60 7.881.8 15 30 15 15 1.35 27.00 84.60 9.002 9 15 6 9 0.54 10.80 95.40 6.00

2.2 9 11 2 9 0.18 3.60 99.00 2.002.4 8 10 2 8 0.18 3.60 102.60 2.252.6 4 10 6 4 0.54 10.80 113.40 13.502.8 9 14 5 9 0.45 9.00 122.40 5.003 10 14 4 10 0.36 7.20 129.60 3.60

3.2 10 13 3 10 0.27 5.40 135.00 2.703.4 10 12 2 10 0.18 3.60 138.60 1.803.6 10 11 1 10 0.09 1.80 140.40 0.903.8 8 9 1 8 0.09 1.80 142.20 1.134 11 12 1 11 0.09 1.80 144.00 0.82

4.2 12 14 2 12 0.18 3.60 147.60 1.504.4 19 20 1 19 0.09 1.80 149.40 0.474.6 20 24 4 20 0.36 7.20 156.60 1.804.8 14 22 8 14 0.72 14.40 171.00 5.145 19 24 5 19 0.45 9.00 180.00 2.37

5.2 22 27 5 22 0.45 9.00 189.00 2.055.4 12 19 7 12 0.63 12.60 201.60 5.255.6 16 24 8 16 0.72 14.40 216.00 4.505.8 14 20 6 14 0.54 10.80 226.80 3.866 12 21 9 12 0.81 16.20 243.00 6.75

6.2 44 52 8 44 0.72 14.40 257.40 1.646.4 150 185 35 150 3.15 63.00 320.40 2.10

(kg/cm2) (kg/cm2) (kg/cm2) (kg/cm2)

Da = 3.65 cm

Db = 3.6 cm Ac = 10.17 cm2

Dpl = 3.6 cm Apl = 10.17 cm2

L = 9.5 cm

Lokasi :

MAT :

Tanggal :

Titik :

Depth qc JHP Fr

(m) (kg/cm) (%)

0.00 0 0.00 0.00

0.20 0 0.00 0.00

0.40 5 7.20 7.20

0.60 9 12.60 3.00

0.80 8 16.20 2.25

1.00 9 21.60 3.00

1.20 9 27.00 3.00

1.40 9 32.40 3.00

1.60 16 57.60 7.88

1.80 15 84.60 9.00

2.00 9 95.40 6.00

2.20 9 99.00 2.00

2.40 8 102.60 2.25

2.60 4 113.40 13.50

2.80 9 122.40 5.00

3.00 10 129.60 3.60

3.20 10 135.00 2.70

3.40 10 138.60 1.80

3.60 10 140.40 0.90

3.80 8 142.20 1.13

4.00 11 144.00 0.82

4.20 12 147.60 1.50

4.40 19 149.40 0.47

4.60 20 156.60 1.80

4.80 14 171.00 5.14

5.00 19 180.00 2.37

5.20 22 189.00 2.05

5.40 12 201.60 5.25

5.60 16 216.00 4.50

5.80 14 226.80 3.86

6.00 12 243.00 6.75

6.20 44 257.40 1.64

6.40 150 320.40 2.10

(kg/cm2)

GRAFIK SONDIR

Proyek : Sondir Sondir No :

Lokasi : Lapangan Depan Hanggar Aero Elevasi :

Dikerjakan oleh : Kelompok B3 MAT :

Tanggal : 6-Feb-13

0 200 400 600 800 1000

0 50 100 1500.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

JHP qcJHP [kg/cm]

Dep

th [m

]

qc [kg/cm2 ]

0 5 10 15 20 25 30 35 40 45

FR [%]

0 200 400 600 800 1000

0 50 100 1500.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

JHP qcJHP [kg/cm]

Dep

th [m

]qc [kg/cm2 ]

0 5 10 15 20 25 30 35 40 45

FR [%]

0 5 10 15 20 25 30 35 40 45

FR [%]

0 5 10 15 20 25 30 35 40 45

FR [%]

Da = 3.65 cm Fr (%)

Db = 3.6 cm Ac = 10.17 cm2 0-0,5

Dpl = 3.6 cm Apl = 10.17 cm2 0,2-2

L = 9.5 cm 2,0-5

>5

No. Depth Cw Tw Kw qc Lf Lf x 20 JHP

(m) (kg/cm2) (kg/cm2) (kg/cm2) (kg/cm) (kg/cm) (kg/cm)

1 0 0 0 0 0 0 0 0

2 0.2 0 0 0 0 0 0 0

3 0.4 5 9 4 5 0.36 7.20 7.20

4 0.6 9 12 3 9 0.27 5.40 12.60

5 0.8 8 10 2 8 0.18 3.60 16.20

6 1 9 12 3 9 0.27 5.40 21.60

7 1.2 9 12 3 9 0.27 5.40 27.00

8 1.4 9 12 3 9 0.27 5.40 32.40

9 1.6 16 30 14 16 1.26 25.20 57.60

10 1.8 15 30 15 15 1.35 27.00 84.60

11 2 9 15 6 9 0.54 10.80 95.40

12 2.2 9 11 2 9 0.18 3.60 99.00

13 2.4 8 10 2 8 0.18 3.60 102.60

14 2.6 4 10 6 4 0.54 10.80 113.40

15 2.8 9 14 5 9 0.45 9.00 122.40

16 3 10 14 4 10 0.36 7.20 129.60

17 3.2 10 13 3 10 0.27 5.40 135.00

18 3.4 10 12 2 10 0.18 3.60 138.60

19 3.6 10 11 1 10 0.09 1.80 140.40

20 3.8 8 9 1 8 0.09 1.80 142.20

21 4 11 12 1 11 0.09 1.80 144.00

22 4.2 12 14 2 12 0.18 3.60 147.60

23 4.4 19 20 1 19 0.09 1.80 149.40

24 4.6 20 24 4 20 0.36 7.20 156.60

25 4.8 14 22 8 14 0.72 14.40 171.00

26 5 19 24 5 19 0.45 9.00 180.00

27 5.2 22 27 5 22 0.45 9.00 189.00

28 5.4 12 19 7 12 0.63 12.60 201.60

29 5.6 16 24 8 16 0.72 14.40 216.00

30 5.8 14 20 6 14 0.54 10.80 226.80

31 6 12 21 9 12 0.81 16.20 243.00

32 6.2 44 52 8 44 0.72 14.40 257.40

33 6.4 150 185 35 150 3.15 63.00 320.40

(kg/cm2)

LABORATORIUM UJI TANAHJURUSAN TEKNIK SIPIL - POLITEKNIK NEGERI BANDUNG

Perkiraan Jenis Tanah

Kerikil

Pasir

Lanau

Lempung

Fr Perkiraan

(%) Jenis Tanah

0 -

0 -

7.20 Lempung

3.00 Lanau

2.25 Lanau

3.00 Lanau

3.00 Lanau

3.00 Lanau

7.88 Lempung

9.00 Lempung

6.00 Lempung

2.00 Lanau

2.25 Lanau

13.50 Lempung

5.00 Lempung

3.60 Lanau

2.70 Lanau

1.80 Pasir

0.90 Pasir

1.13 Pasir

0.82 Pasir

1.50 Pasir

0.47 Kerikil

1.80 Pasir

5.14 Lempung

2.37 Lanau

2.05 Lanau

5.25 Lempung

4.50 Lanau

3.86 Lanau

6.75 Lempung

1.64 Pasir

2.10 Lanau

LABORATORIUM UJI TANAHJURUSAN TEKNIK SIPIL - POLITEKNIK NEGERI BANDUNG