COMPANY PROFILE PT.GALANG SOLUSI TEKNIKptgst.id/wp-content/uploads/2017/04/comprogst-13.pdf ·...

Post on 29-Mar-2021

5 views 0 download

Transcript of COMPANY PROFILE PT.GALANG SOLUSI TEKNIKptgst.id/wp-content/uploads/2017/04/comprogst-13.pdf ·...

Head Office :Jl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214

Branch Office :Jl lokasi no 27 Desa Bangun Sari Kec.Tanjung Morawa Kab.Deli Serdang, Sumatera Utara

Branch Office :Jl. Duren Tiga Buntu No. 38A RT.5/RW.3, Kec. Pancoran,Jakarta Selatan

Branch Office :Jl. Pajar Permai KM 11 Komplek Perubahan Bumi Semaja Indah no 9, Alang - alang Lebar Kota Palembang

Branch Office :Jl. Mangga III/E366 Sidoarjo - Jawa Timur

Telp : 021 - 89441890 Email : galang.solusi.teknik@gmail.com

COMPANY PROFILE PT.GALANG SOLUSI TEKNIK

ptgst.idGalangSolusiTeknik @gstofficial__ @gstofficial__

Contact us :

PT.GALANG SOLUSI TEKNIK is managed by an experienced management team with minimum 20 years of experience in handling electrical, instrumentation, telecommunication, and mechanical project, from engineering thru commissioning phase.

The qualify of our services stems from our ability to fulfill and exceed our client’s expectation, with high regard for health, safety, and the environment.

COMPANY INTRODUCTION

OUR VISION & MISSION :The ideas to set up this company was to provide the most valuable deliverables projects to the customer while pursuing the company’s growth.

MANAGEMENTThe experience of the management teams with the Multi-National Companies telecommunication, Civil construction companies and Power Electricity such as SIEMENS, NSN, NOKIA, ZTE, ERICSON, ALU, NEC AND HUAWEI, ABB, SCHNEIDER, TORISHIMAGUNA provide an assured capability in handling project in all business environment.

OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT POLICYCommitted to Occupational Health, Safety and Environment (OHSE) as a core value of the corporation and as an integral part of our business activities in protecting employees, customers and stake holders.We adopt the international standards methodology and its implementation of Safety, Health and Environment in our daily operations.

CONTINUOUS QUALITY IMPROVEMENT POLICYCommitted to continuous quality improvement, by using continuous quality improvement methodology and implementing the best practices across disciplines and business area.

● President Director : Sawaluddin Toelle● Marketing and

Sales Director : Happy Salawangi● Project Director : Misno● Project Manager : Sugeng Triyono● Sales Respentative : Dedi Armen● Technical Manager : - Misno

- Tata Supriyatna● Head Engineer : Yulianto● Field Engineer : Habib Nur Hamdi● Logistic &

Warehouse : Suba ● Project Control : Afrizal S. E

● Civil Engineeer : Fernando Simangunsong.STA● HSE : Hermayadi● QAQC Manager : Budi Kurniawan● Human Resources : Johnny Pattipeilohy● Finance Manager : Teddy Pribaddy● Commercial : Reza Hadi● Field Personnel : Wiwin Saputra

BUSINESS ORGANIZATION

Description Remarks

Notary Decree EVA SARI HUTAJULU, SH, Mkn

Notary Deed No. 11

Tax No (NPWP) 74.442.853.3-121.000

Trade License (SIUP) 0298 / 0052 /1. 1.2107/01/2016

Company Registration (TDP) 02.12.1.46.24161/0081/0457/01/2016

Ministry of Law & Human Right AHU-3584916. AH. 01. 11.TH.2015

Telekomunikasi, Electrical, Civil Construction and General Supplier

Scope: Telecommunication, Low, Medium and High Voltage Electrical, Tower Civil Construction Planning, Installation, Integration, Maintenance and main power supply

LEGAL CERTIFICATION

NO

1

2

3

4

5

6

7

COMPANY ADDRESS

Head office :PT Galang Solusi TeknikJl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214

Branch office:PT Galang Solusi TeknikJl. Duren Tiga Buntu No.38A, Jakarta Selatan

Branch office:PT Galang Solusi TeknikJl. Mangga III/E366 Sidoarjo - Jawa Timur

Branch office:PT Galang Solusi TeknikJl lokasi no 27 desa bangun sari kec tanjung morawa kab deli serdang Sumatera Utara

Branch office:PT Galang Solusi TeknikJl. pajar permai KM 11 komplek perubahan bumi semaja indah no 9, Alang - alang Lebar Kota Palembang

TELCO PROJECT PHOTOS

MAINTENANCE INDOSAT WONOTIRTO

TELCO PROJECT PHOTOS

TELCO PROJECT PHOTOSClosing Data and Dismantle ISAT PROJECT

TELCO PROJECT PHOTOS

MXSERIES

ACX SERIES

DEPLOYMENT ROUTER JUNIPER SMARTFREN/NEC/PMN

TELCO PROJECT PHOTOS

Dismantle STP Sunrise at Site Beringin Siantar

Design System

Installed TP5000

TELCO PROJECT PHOTOS

Project Site Martoba Siantar Alita XL

TELCOPROJECTPHOTOS

ANTENNA AND ODU INSTALLED ANTENNA

Deployment Microwave Transmission : Indosat / XL / Smartfren / Alita / NEC

TELCO PROJECT PHOTOS

TELCO PROJECT PHOTOS

Project HOP Base Site Taba - Area Sumatera Selatan

TELCO PROJECT PHOTOS

Installed Rectifier & Battery

DC Current Measurement

Deployment Rectifier and Battery Indosat / Smartfren

Deployment Swap Microwave SRT1F Indosat

TELCO PROJECT PHOTOS

Logistic (Warehousing and Delivery to Site) Alita / NEC

Kitting and Delivery Preparation

Challenging Handery to Hill Site

TELCO PROJECT PHOTOS

Resource Supply ICT Teams ASIAN GAMES Palembang NEC

TELCO PROJECT PHOTOS

TELCO PROJECT PHOTOS

Reward from NEC for IT Infrastructure on 18th ASIAN GAMES 2018.

TELCO PROJECT PHOTOS TAKE HOP BASE (FATP,ATP) - SITE LINAU

TAKE DATA NETGEAR - SITE TEIMURJO

TELCO PROJECT PHOTOS

TELCO PROJECT PHOTOSPROJECT HOP BASE ( FATP,NG INSTALL, NG DISMANTLE,

DISMANTLE,ATP ) SITE NAME IPUH

TELCO PROJECT PHOTOS

PROJECT HOP BASE (FATP,ATP) -SITE HIBRIDA

TELCO PROJECT PHOTOSDISMANTLE IDU DTS - SITE NAME RAMBUNG MERAH SIANTAR

TELCO PROJECT PHOTOS TROUBLESHOOT & NETGEAR - SITE

PAJARAKAN

TELCO PROJECT PHOTOS TAKE DATA ATP AND DISMANTLE

SITE 11MEN053 Modong

TELCO PROJECT PHOTOS

Site Name - Naga Huta

Dismantle STP Sunrise

Site Pemulutan - Photo ATP, DM, Netgear and FATP ISAT Project

Site Balong - Installation Pointing NMSTELCO PROJECT PHOTOS

TELCO PROJECT PHOTOS

Site - HOTEL SWARNA DWIPA (Palembang)

Dismantle / Netgear

TELCO PROJECT PHOTOS

INSTALLATION IDU - INDOSAT PROJECT

TELCO PROJECT PHOTOS Installation On Site - Bukit Besar (Palembang)

TELCO PROJECT PHOTOSISAT PROJECT - Site INDRALAYA_BARU

Connection Link Protection

TELCO PROJECT PHOTOS PROJECT INDOSAT Install & Pointing Site Ngusikan - Site Jombatan_JMB

TELCO PROJECT PHOTOS

Install Radio Link

Site Tanjung

Rejo

TELCO PROJECT PHOTOS

Pointing at Site Ngadirejo Indosat Project

TELCO PROJECT PHOTOS MOS DAN INSTALL ON SITE - KANTOR GUBERNUR (SUMSEL)

TELCO PROJECT PHOTO Installation at Site Panjen Kidul, Indosat Project

TELCO PROJECT PHOTOS

SITE - JL BUMIMANTI

SITE - UNILA

Take data

Mos & Install

(Bandar Lampung)

(Bandar Lampung)

TELCO PROJECT PHOTOS

Troubleshoot at Site Pahoman_PJK (Indosat), Bandar Lampung

TELCO PROJECT PHOTOSNetgear and Dismantle at Site Belinyu (South Sumatera)

TELCO PROJECT PHOTOS

Troubleshoot, Mos and Installation - Site Sukarami_PLG

TELCO PROJECT PHOTOS

Documentation ATP at Site Tempilang

TELCO PROJECT PHOTOS

Fiber Optic Splicing

Doc.

INDOSAT PROJECT

Installation Fiber Optic

TELCO PROJECT PHOTOS West Kalimantan - XL Project

Charity Program for the public

during Covid - 19 pandemic.

- 1 Unit Ambulance- Acces road construction along 100 meters

CLIENT END USER

1

2

3

4

POWER PROJECT EXPERIENCE LIST

PT Cikarang Listrindo Extension Phase IVBInstallation of additional MV Panels & Commissioning 150kV Switchyard Phase IVB, Transformer, Relay, Safety & Control Devices

PT. SIEMENS INDONESIA

PT. Cikarang Listrindo

150 kV Substation Semen TubanConstruction, Test and commissioning 150 kV Substation

PT. SIEMENS INDONESIA PTDH

PT. SEMEN TUBAN

PT Cikarang Listrindo Extension Phase VIConstruction & Commissioning 150 kV Switchyard, MV/LV Power Distribution System ( Transformer, Busduct, MV Switchgear, LV Switchboard), Substation Automation System

PT. SIEMENS INDONESIA

PT. Cikarang Listrindo

115 kV GIS Siemens type 8DN8-26 Bays at Amole Site and 5 bays at Power Plant C Construction and Testing

PT. SIEMENS INDONESIA

Freeport Indonesia

CLIENT END USER

5

6

POWER PROJECT EXPERIENCE LIST

Paiton Power Generation Unit 5 & 6 Power, East JavaMaintenance Circuit Breaker Analyzer & Inspection GIS 500 kV : Trafo 760 MVA, Busduct 21kV & Generator Star Point

PT. Siemens Indonesia PTD Division

YTL JAVA POWER

PLTU TANJUNG JATI 2 Maintenance HV Equipment, 150 kV and 500 kV GIS Switchyard

PT. Siemens Indonesia PTD

PLTU TANJUNG JATI 2

Brawijaya Hospital Saharjo Electronic - Tebet, South Jakarta

Substation 150 kV Topoyo (New) - Topoyo, South Sulawesi

PT. Panata Bayu Nugraha

Brawijaya Hospital

PT. ABB Sakti Industri

PT. PLN (PERSERO)

7

8

7

CLIENT END USER

9 North Duri Cogeneration Plant, Chevron, Riau1. Major Overhaul Gas Turbine Generator Unit 1,2,3 (125@MW)2. Electrical & Instrument Combustion Inspection TG Unit 1,2,3

PT. Siemens Infonesia PTDH

MCTN Chevron

10 PLTGM Payo Selincah JambiConstruction & Testing 150 kV Substation trafo bay

PT. ABB Sakti Industri

PT PLN

PT. HEIN GLOBAL UTAMA

PT. Tanjung Power Indonesia

SORIK MERAPI GEOTHERMAL PROJECT150 kV Transmission Line & Substation (Civil, Mechanical, Electrical erection & Testing Commissioning

Huadong China

PT. SMGP

11

12

TANJUNG TABALONG KALSEL2x100MW Coal Fired Power Plant Construction & Testing(Power Transformer, LV & MV Switchgear, Insulation Phase Busduct, cable tray / cable race way, cable pulling, cable Termination, Lighting system, Fire Alarm system & Instrumentation)

POWER PROJECT EXPERIENCE LIST

CLIENT END USER

13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

PT. ABB Sakti Industri

PT. Supreme Energy Muara Laboh (SEML)

PT. Torishimaguna

Sarulla Operation Ltd NIL-North Sumatera

150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti Industri

PT. PLN (PERSERO)

15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL Project

PT. Torishimaguna

Sarulla Operation Ltd SIL-North Sumatera

16

POWER PROJECT EXPERIENCE LIST

CLIENT END USER

17150 kV Substation - CVT Hotspot :

● 150 kV Ciamis Substation ● 150 kV Pandean Lamper Substation - Semarang● 150 kV Tambak Lorok Substation - Semarang● 150 kV Blora Substation● 150 kV Karawang Substation ● 150 kV Haurgelis Substation● 150 kV banjar Substation ● 150 kV Cianjut Substation

PT.ABB Sakti Industri

PT.PLN (PERSERO)

POWER PROJECT EXPERIENCE LIST

CLIENT END USER

13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

PT. ABB Sakti Industri

PT. Supreme Energy Muara Laboh (SEML)

PT. Torishimaguna

Sarulla Operation Ltd NIL-North Sumatera

150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti Industri

PT. PLN (PERSERO)

15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL Project

PT. Torishimaguna

Sarulla Operation Ltd SIL-North Sumatera

16

POWER PROJECT EXPERIENCE LIST

Coal Fired Power Plant Cirebon 2 - West Java : ● Transformer Assembly for 1000MVA/500kV● Oil Purification ● Testing

For : GSUT - 1000MVA-22kV/500kV, SAT1 65MVA-22kV/11kV, SAT2 65MVA-500kV/11kV

WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING.PT

PT. Cirebon Power18

CLIENT END USER

19GIS 150kV Geothermal Rantau Dedap, South Sumatera :

● GIS Container + Accessories● Steel Structure, Gantry, Conductor, String Set and Steel Support● 150kV LA & 150 kV CVT● LV - MV Control Cable Work & Fiber Optic● CRP, SAS, Telecommunication Equipment, DFR, Energy Meter Panel● Fiber Optic Installation and Splicing● Grounding Work● Test and Commisioning

PT.ABB Sakti Industri

PT. Supreme Energy Rantau Dedap

POWER PROJECT EXPERIENCE LIST

CLIENT END USER

13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

PT. ABB Sakti Industri

PT. Supreme Energy Muara Laboh (SEML)

PT. Torishimaguna

Sarulla Operation Ltd NIL-North Sumatera

150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti Industri

PT. PLN (PERSERO)

15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL Project

PT. Torishimaguna

Sarulla Operation Ltd SIL-North Sumatera

16

POWER PROJECT EXPERIENCE LIST

20 500kV HV Apparatus, Klaten - Central Java :Installation Include Individual Test

PT. ABB Power Grides Indonesia

PT. PLN (PERSERO)

21 66kV Pad AA Substation Sorik Marapi : HDEC Power China

Sorik Marapi Geothermal Power

GIS (Gas Insulated Switchgear) - Erection & Test Commissioning❏ SIEMENS - 8DN8-II

(FREEPORT-PROJECT) 115kV GIS Installation & CommissioningPower project photos

Power project photosAIS (Air Insulated Switchgear) - Erection & Test Commissioning CIKARANG LISTRINDO PROJECT PHASE-VB/150 kV Gantry/Beam assembly/CB/Trafo.

Brawijaya Saharjo Hospital - Tebet, South Jakarta PT.PANATA BAYU NUGRAHAMechanical Electrical Installation

TANJUNG TABALONG KALSEL PROJECT 150 kV KALSEL Switchyard & Transmission Line / Tower Foundation

GIS (Gas Insulated Switchgear) - Erection & Test CommissioningSiemens-8DN8 Switchgear (OKI-PULP & PAPER PROJECT)

Power project photos

Power project photosAIS (AIR INSULATED SWITCHGEAR) - ERECTION & TEST COMMISSIONINGCIKARANG LISTRINDO PROJECT PHASE-VB / MV CABLE / 150 kV CABLE/ TRAFO / GCB

500 kV GIS Refurbishment Work - Erection & Test Commissioning Hitachi GIS 500 kV - PT.PAITON ENERGY - IPMOMI

Power project photos

Pow

er p

roje

ct p

hoto

s SORIK MARAPI GEOTHERMAL PROJECT150 kV SMGP Switchyard & Transmission Line / Tower Erection

SARULLA OPERATION LTD-GEOTHERMAL POWER PLANT150 kV SMGP Switchyard & Transmission Line / Tower Erection

Power project photosSARULLA OPERATION LTD-GEOTHERMAL POWER PLANTElectrical Inspection & Maintenance Sarulla SIL - Project

Power project photos

150 kV Extension GI New Balaraja - Tangerang - West Java PT. ABB Sakti IndustriMechanical Electrical installation

Power project photos

SUBSTATION 150 kV TOPOYO (new) SOUTH SULAWESI PT.ABB SAKTI INDUSTRIMechanical Electrical Installation

Power project photos

150 kV CVT HOTSPOT - 150 kV SUBSTATION PT. ABB SAKTI INDUSTRIMechanical Electrical Installation & Testing

Power project photos

Project : Cirebon 2, 1x1000MW Coal Fired Project, Indonesia

1000MVA Transformer Installation, Oil Purification and Testing

Power project photos

Project : Rantau Dedap Geothermal Power ProjectInstallation & Testing GIS 150kV

Power project photos

500kV HV Apparatus, Installation Include Individual Test - Klaten ( Central Java )

Installation & Testing

Power project photos

66kV Pad AA Substation

Sorik Marapi

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

COMPANY Certificate and Legalicy

“We believe that by providing valuables deliverables to

customers will creates company’s growth”

Find us on :

Thanks for your time

GalangSolusiTeknikptgst.id @gstofficial__ @gstofficial__

Hopefully we can be partner in future