Head Ofice : Jl. Symphoni Raya Blok HX-1 No.127 Bekasi-Jawa Barat 17214 Branch Ofice : Jl lokasi no 27 Desa Bangun Sari Kec.Tanjung Morawa Kab.Deli Serdang, Sumatera Utara Branch Ofice : Jl. Duren Tiga Buntu No. 38A RT.5/RW.3, Kec. Pancoran,Jakarta Selatan Branch Ofice : Jl. Pajar Permai KM 11 Komplek Perubahan Bumi Semaja Indah no 9, Alang - alang Lebar Kota Palembang Branch Ofice : Jl. Mangga III/E366 Sidoarjo - Jawa Timur Telp : 021 - 89441890 Email : [email protected] COMPANY PROFILE PT.GALANG SOLUSI TEKNIK ptgst.id GalangSolusiTeknik @gstoficial__ @gstoficial__ Contact us :

Embed Size (px)

Transcript of COMPANY PROFILE PT.GALANG SOLUSI TEKNIKptgst.id/wp-content/uploads/2017/04/comprogst-13.pdf ·...

  • Head Office :Jl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214

    Branch Office :Jl lokasi no 27 Desa Bangun Sari Kec.Tanjung Morawa Kab.Deli Serdang, Sumatera Utara

    Branch Office :Jl. Duren Tiga Buntu No. 38A RT.5/RW.3, Kec. Pancoran,Jakarta Selatan

    Branch Office :Jl. Pajar Permai KM 11 Komplek Perubahan Bumi Semaja Indah no 9, Alang - alang Lebar Kota Palembang

    Branch Office :Jl. Mangga III/E366 Sidoarjo - Jawa Timur

    Telp : 021 - 89441890 Email : [email protected]

    COMPANY PROFILE PT.GALANG SOLUSI TEKNIK

    ptgst.idGalangSolusiTeknik @gstofficial__ @gstofficial__

    Contact us :

  • PT.GALANG SOLUSI TEKNIK is managed by an experienced management team with minimum 20 years of experience in handling electrical, instrumentation, telecommunication, and mechanical project, from engineering thru commissioning phase.

    The qualify of our services stems from our ability to fulfill and exceed our client’s expectation, with high regard for health, safety, and the environment.

    COMPANY INTRODUCTION

  • OUR VISION & MISSION :The ideas to set up this company was to provide the most valuable deliverables projects to the customer while pursuing the company’s growth.

    MANAGEMENTThe experience of the management teams with the Multi-National Companies telecommunication, Civil construction companies and Power Electricity such as SIEMENS, NSN, NOKIA, ZTE, ERICSON, ALU, NEC AND HUAWEI, ABB, SCHNEIDER, TORISHIMAGUNA provide an assured capability in handling project in all business environment.

    OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT POLICYCommitted to Occupational Health, Safety and Environment (OHSE) as a core value of the corporation and as an integral part of our business activities in protecting employees, customers and stake holders.We adopt the international standards methodology and its implementation of Safety, Health and Environment in our daily operations.

    CONTINUOUS QUALITY IMPROVEMENT POLICYCommitted to continuous quality improvement, by using continuous quality improvement methodology and implementing the best practices across disciplines and business area.

  • ● President Director : Sawaluddin Toelle● Marketing and

    Sales Director : Happy Salawangi● Project Director : Misno● Project Manager : Sugeng Triyono● Sales Respentative : Dedi Armen● Technical Manager : - Misno

    - Tata Supriyatna● Head Engineer : Yulianto● Field Engineer : Habib Nur Hamdi● Logistic &

    Warehouse : Suba ● Project Control : Afrizal S. E

    ● Civil Engineeer : Fernando Simangunsong.STA● HSE : Hermayadi● QAQC Manager : Budi Kurniawan● Human Resources : Johnny Pattipeilohy● Finance Manager : Teddy Pribaddy● Commercial : Reza Hadi● Field Personnel : Wiwin Saputra

    BUSINESS ORGANIZATION

  • Description Remarks

    Notary Decree EVA SARI HUTAJULU, SH, Mkn

    Notary Deed No. 11

    Tax No (NPWP) 74.442.853.3-121.000

    Trade License (SIUP) 0298 / 0052 /1. 1.2107/01/2016

    Company Registration (TDP) 02.12.1.46.24161/0081/0457/01/2016

    Ministry of Law & Human Right AHU-3584916. AH. 01. 11.TH.2015

    Telekomunikasi, Electrical, Civil Construction and General Supplier

    Scope: Telecommunication, Low, Medium and High Voltage Electrical, Tower Civil Construction Planning, Installation, Integration, Maintenance and main power supply

    LEGAL CERTIFICATION

    NO

    1

    2

    3

    4

    5

    6

    7

  • COMPANY ADDRESS

    Head office :PT Galang Solusi TeknikJl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214

    Branch office:PT Galang Solusi TeknikJl. Duren Tiga Buntu No.38A, Jakarta Selatan

    Branch office:PT Galang Solusi TeknikJl. Mangga III/E366 Sidoarjo - Jawa Timur

    Branch office:PT Galang Solusi TeknikJl lokasi no 27 desa bangun sari kec tanjung morawa kab deli serdang Sumatera Utara

    Branch office:PT Galang Solusi TeknikJl. pajar permai KM 11 komplek perubahan bumi semaja indah no 9, Alang - alang Lebar Kota Palembang

  • TELCO PROJECT PHOTOS

    MAINTENANCE INDOSAT WONOTIRTO

  • TELCO PROJECT PHOTOS

  • TELCO PROJECT PHOTOSClosing Data and Dismantle ISAT PROJECT

  • TELCO PROJECT PHOTOS

    MXSERIES

    ACX SERIES

    DEPLOYMENT ROUTER JUNIPER SMARTFREN/NEC/PMN

  • TELCO PROJECT PHOTOS

    Dismantle STP Sunrise at Site Beringin Siantar

  • Design System

    Installed TP5000

    TELCO PROJECT PHOTOS

  • Project Site Martoba Siantar Alita XL

    TELCOPROJECTPHOTOS

  • ANTENNA AND ODU INSTALLED ANTENNA

    Deployment Microwave Transmission : Indosat / XL / Smartfren / Alita / NEC

    TELCO PROJECT PHOTOS

  • TELCO PROJECT PHOTOS

    Project HOP Base Site Taba - Area Sumatera Selatan

  • TELCO PROJECT PHOTOS

    Installed Rectifier & Battery

    DC Current Measurement

    Deployment Rectifier and Battery Indosat / Smartfren

  • Deployment Swap Microwave SRT1F Indosat

    TELCO PROJECT PHOTOS

  • Logistic (Warehousing and Delivery to Site) Alita / NEC

    Kitting and Delivery Preparation

    Challenging Handery to Hill Site

    TELCO PROJECT PHOTOS

  • Resource Supply ICT Teams ASIAN GAMES Palembang NEC

    TELCO PROJECT PHOTOS

  • TELCO PROJECT PHOTOS

    Reward from NEC for IT Infrastructure on 18th ASIAN GAMES 2018.

  • TELCO PROJECT PHOTOS TAKE HOP BASE (FATP,ATP) - SITE LINAU

  • TAKE DATA NETGEAR - SITE TEIMURJO

    TELCO PROJECT PHOTOS

  • TELCO PROJECT PHOTOSPROJECT HOP BASE ( FATP,NG INSTALL, NG DISMANTLE,

    DISMANTLE,ATP ) SITE NAME IPUH

  • TELCO PROJECT PHOTOS

    PROJECT HOP BASE (FATP,ATP) -SITE HIBRIDA

  • TELCO PROJECT PHOTOSDISMANTLE IDU DTS - SITE NAME RAMBUNG MERAH SIANTAR

  • TELCO PROJECT PHOTOS TROUBLESHOOT & NETGEAR - SITE

    PAJARAKAN

  • TELCO PROJECT PHOTOS TAKE DATA ATP AND DISMANTLE

    SITE 11MEN053 Modong

  • TELCO PROJECT PHOTOS

    Site Name - Naga Huta

    Dismantle STP Sunrise

  • Site Pemulutan - Photo ATP, DM, Netgear and FATP ISAT Project

  • Site Balong - Installation Pointing NMSTELCO PROJECT PHOTOS

  • TELCO PROJECT PHOTOS Site - HOTEL SWARNA DWIPA

    (Palembang) Dismantle / Netgear

  • TELCO PROJECT PHOTOS

    INSTALLATION IDU - INDOSAT PROJECT

  • TELCO PROJECT PHOTOS Installation On Site - Bukit Besar (Palembang)

  • TELCO PROJECT PHOTOSISAT PROJECT - Site INDRALAYA_BARU

    Connection Link Protection

  • TELCO PROJECT PHOTOS PROJECT INDOSAT Install & Pointing Site Ngusikan - Site Jombatan_JMB

  • TELCO PROJECT PHOTOS

    Install Radio Link

    Site Tanjung

    Rejo

  • TELCO PROJECT PHOTOS

    Pointing at Site Ngadirejo Indosat Project

  • TELCO PROJECT PHOTOS MOS DAN INSTALL ON SITE - KANTOR GUBERNUR (SUMSEL)

  • TELCO PROJECT PHOTO Installation at Site Panjen Kidul, Indosat Project

  • TELCO PROJECT PHOTOS

    SITE - JL BUMIMANTI

    SITE - UNILA

    Take data

    Mos & Install

    (Bandar Lampung)

    (Bandar Lampung)

  • TELCO PROJECT PHOTOS

    Troubleshoot at Site Pahoman_PJK (Indosat), Bandar Lampung

  • TELCO PROJECT PHOTOSNetgear and Dismantle at Site Belinyu (South Sumatera)

  • TELCO PROJECT PHOTOS

    Troubleshoot, Mos and Installation - Site Sukarami_PLG

  • TELCO PROJECT PHOTOS

    Documentation ATP at Site Tempilang

  • TELCO PROJECT PHOTOS

    Fiber Optic Splicing

    Doc.

    INDOSAT PROJECT

  • Installation Fiber Optic

    TELCO PROJECT PHOTOS West Kalimantan - XL Project

  • Charity Program for the public

    during Covid - 19 pandemic.

    - 1 Unit Ambulance- Acces road construction along 100 meters

  • CLIENT END USER

    1

    2

    3

    4

    POWER PROJECT EXPERIENCE LIST

    PT Cikarang Listrindo Extension Phase IVBInstallation of additional MV Panels & Commissioning 150kV Switchyard Phase IVB, Transformer, Relay, Safety & Control Devices

    PT. SIEMENS INDONESIA

    PT. Cikarang Listrindo

    150 kV Substation Semen TubanConstruction, Test and commissioning 150 kV Substation

    PT. SIEMENS INDONESIA PTDH

    PT. SEMEN TUBAN

    PT Cikarang Listrindo Extension Phase VIConstruction & Commissioning 150 kV Switchyard, MV/LV Power Distribution System ( Transformer, Busduct, MV Switchgear, LV Switchboard), Substation Automation System

    PT. SIEMENS INDONESIA

    PT. Cikarang Listrindo

    115 kV GIS Siemens type 8DN8-26 Bays at Amole Site and 5 bays at Power Plant C Construction and Testing

    PT. SIEMENS INDONESIA

    Freeport Indonesia

  • CLIENT END USER

    5

    6

    POWER PROJECT EXPERIENCE LIST

    Paiton Power Generation Unit 5 & 6 Power, East JavaMaintenance Circuit Breaker Analyzer & Inspection GIS 500 kV : Trafo 760 MVA, Busduct 21kV & Generator Star Point

    PT. Siemens Indonesia PTD Division

    YTL JAVA POWER

    PLTU TANJUNG JATI 2 Maintenance HV Equipment, 150 kV and 500 kV GIS Switchyard

    PT. Siemens Indonesia PTD

    PLTU TANJUNG JATI 2

    Brawijaya Hospital Saharjo Electronic - Tebet, South Jakarta

    Substation 150 kV Topoyo (New) - Topoyo, South Sulawesi

    PT. Panata Bayu Nugraha

    Brawijaya Hospital

    PT. ABB Sakti Industri

    PT. PLN (PERSERO)

    7

    8

    7

  • CLIENT END USER

    9 North Duri Cogeneration Plant, Chevron, Riau1. Major Overhaul Gas Turbine Generator Unit 1,2,3 ([email protected])2. Electrical & Instrument Combustion Inspection TG Unit 1,2,3

    PT. Siemens Infonesia PTDH

    MCTN Chevron

    10 PLTGM Payo Selincah JambiConstruction & Testing 150 kV Substation trafo bay PT. ABB Sakti IndustriPT PLN

    PT. HEIN GLOBAL UTAMA

    PT. Tanjung Power Indonesia

    SORIK MERAPI GEOTHERMAL PROJECT150 kV Transmission Line & Substation (Civil, Mechanical, Electrical erection & Testing Commissioning

    Huadong China

    PT. SMGP

    11

    12

    TANJUNG TABALONG KALSEL2x100MW Coal Fired Power Plant Construction & Testing(Power Transformer, LV & MV Switchgear, Insulation Phase Busduct, cable tray / cable race way, cable pulling, cable Termination, Lighting system, Fire Alarm system & Instrumentation)

    POWER PROJECT EXPERIENCE LIST

  • CLIENT END USER

    13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

    14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

    PT. ABB Sakti Industri

    PT. Supreme Energy Muara Laboh (SEML)

    PT. Torishimaguna

    Sarulla Operation Ltd NIL-North Sumatera

    150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)

    15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna

    Sarulla Operation Ltd SIL-North Sumatera

    16

    POWER PROJECT EXPERIENCE LIST

  • CLIENT END USER

    17150 kV Substation - CVT Hotspot :

    ● 150 kV Ciamis Substation ● 150 kV Pandean Lamper Substation - Semarang● 150 kV Tambak Lorok Substation - Semarang● 150 kV Blora Substation● 150 kV Karawang Substation ● 150 kV Haurgelis Substation● 150 kV banjar Substation ● 150 kV Cianjut Substation

    PT.ABB Sakti Industri

    PT.PLN (PERSERO)

    POWER PROJECT EXPERIENCE LIST

    CLIENT END USER

    13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

    14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

    PT. ABB Sakti Industri

    PT. Supreme Energy Muara Laboh (SEML)

    PT. Torishimaguna

    Sarulla Operation Ltd NIL-North Sumatera

    150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)

    15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna

    Sarulla Operation Ltd SIL-North Sumatera

    16

    POWER PROJECT EXPERIENCE LIST

    Coal Fired Power Plant Cirebon 2 - West Java : ● Transformer Assembly for 1000MVA/500kV● Oil Purification ● Testing

    For : GSUT - 1000MVA-22kV/500kV, SAT1 65MVA-22kV/11kV, SAT2 65MVA-500kV/11kV

    WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING.PT

    PT. Cirebon Power18

  • CLIENT END USER

    19GIS 150kV Geothermal Rantau Dedap, South Sumatera :

    ● GIS Container + Accessories● Steel Structure, Gantry, Conductor, String Set and Steel Support● 150kV LA & 150 kV CVT● LV - MV Control Cable Work & Fiber Optic● CRP, SAS, Telecommunication Equipment, DFR, Energy Meter Panel● Fiber Optic Installation and Splicing● Grounding Work● Test and Commisioning

    PT.ABB Sakti Industri

    PT. Supreme Energy Rantau Dedap

    POWER PROJECT EXPERIENCE LIST

    CLIENT END USER

    13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis

    14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project

    PT. ABB Sakti Industri

    PT. Supreme Energy Muara Laboh (SEML)

    PT. Torishimaguna

    Sarulla Operation Ltd NIL-North Sumatera

    150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)

    15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna

    Sarulla Operation Ltd SIL-North Sumatera

    16

    POWER PROJECT EXPERIENCE LIST

    20 500kV HV Apparatus, Klaten - Central Java :Installation Include Individual Test

    PT. ABB Power Grides Indonesia

    PT. PLN (PERSERO)

    21 66kV Pad AA Substation Sorik Marapi : HDEC Power ChinaSorik Marapi Geothermal Power

  • GIS (Gas Insulated Switchgear) - Erection & Test Commissioning❏ SIEMENS - 8DN8-II

    (FREEPORT-PROJECT) 115kV GIS Installation & CommissioningPower project photos

  • Power project photosAIS (Air Insulated Switchgear) - Erection & Test Commissioning CIKARANG LISTRINDO PROJECT PHASE-VB/150 kV Gantry/Beam assembly/CB/Trafo.

    Brawijaya Saharjo Hospital - Tebet, South Jakarta PT.PANATA BAYU NUGRAHAMechanical Electrical Installation

  • TANJUNG TABALONG KALSEL PROJECT 150 kV KALSEL Switchyard & Transmission Line / Tower Foundation

    GIS (Gas Insulated Switchgear) - Erection & Test CommissioningSiemens-8DN8 Switchgear (OKI-PULP & PAPER PROJECT)

    Power project photos

  • Power project photosAIS (AIR INSULATED SWITCHGEAR) - ERECTION & TEST COMMISSIONINGCIKARANG LISTRINDO PROJECT PHASE-VB / MV CABLE / 150 kV CABLE/ TRAFO / GCB

  • 500 kV GIS Refurbishment Work - Erection & Test Commissioning Hitachi GIS 500 kV - PT.PAITON ENERGY - IPMOMI

    Power project photos

  • Pow

    er p

    roje

    ct p

    hoto

    s SORIK MARAPI GEOTHERMAL PROJECT150 kV SMGP Switchyard & Transmission Line / Tower Erection

    SARULLA OPERATION LTD-GEOTHERMAL POWER PLANT150 kV SMGP Switchyard & Transmission Line / Tower Erection

  • Power project photosSARULLA OPERATION LTD-GEOTHERMAL POWER PLANTElectrical Inspection & Maintenance Sarulla SIL - Project

  • Power project photos

    150 kV Extension GI New Balaraja - Tangerang - West Java PT. ABB Sakti IndustriMechanical Electrical installation

  • Power project photos

    SUBSTATION 150 kV TOPOYO (new) SOUTH SULAWESI PT.ABB SAKTI INDUSTRIMechanical Electrical Installation

  • Power project photos

    150 kV CVT HOTSPOT - 150 kV SUBSTATION PT. ABB SAKTI INDUSTRIMechanical Electrical Installation & Testing

  • Power project photos

    Project : Cirebon 2, 1x1000MW Coal Fired Project, Indonesia

    1000MVA Transformer Installation, Oil Purification and Testing

  • Power project photos

    Project : Rantau Dedap Geothermal Power ProjectInstallation & Testing GIS 150kV

  • Power project photos

    500kV HV Apparatus, Installation Include Individual Test - Klaten ( Central Java )

    Installation & Testing

  • Power project photos

    66kV Pad AA Substation

    Sorik Marapi

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • COMPANY Certificate and Legalicy

  • “We believe that by providing valuables deliverables to

    customers will creates company’s growth”

    Find us on :

    Thanks for your time

    GalangSolusiTeknikptgst.id @gstofficial__ @gstofficial__

    Hopefully we can be partner in future