COMPANY PROFILE PT.GALANG SOLUSI TEKNIKptgst.id/wp-content/uploads/2017/04/comprogst-13.pdf ·...
Embed Size (px)
Transcript of COMPANY PROFILE PT.GALANG SOLUSI TEKNIKptgst.id/wp-content/uploads/2017/04/comprogst-13.pdf ·...
-
Head Office :Jl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214
Branch Office :Jl lokasi no 27 Desa Bangun Sari Kec.Tanjung Morawa Kab.Deli Serdang, Sumatera Utara
Branch Office :Jl. Duren Tiga Buntu No. 38A RT.5/RW.3, Kec. Pancoran,Jakarta Selatan
Branch Office :Jl. Pajar Permai KM 11 Komplek Perubahan Bumi Semaja Indah no 9, Alang - alang Lebar Kota Palembang
Branch Office :Jl. Mangga III/E366 Sidoarjo - Jawa Timur
Telp : 021 - 89441890 Email : [email protected]
COMPANY PROFILE PT.GALANG SOLUSI TEKNIK
ptgst.idGalangSolusiTeknik @gstofficial__ @gstofficial__
Contact us :
-
PT.GALANG SOLUSI TEKNIK is managed by an experienced management team with minimum 20 years of experience in handling electrical, instrumentation, telecommunication, and mechanical project, from engineering thru commissioning phase.
The qualify of our services stems from our ability to fulfill and exceed our client’s expectation, with high regard for health, safety, and the environment.
COMPANY INTRODUCTION
-
OUR VISION & MISSION :The ideas to set up this company was to provide the most valuable deliverables projects to the customer while pursuing the company’s growth.
MANAGEMENTThe experience of the management teams with the Multi-National Companies telecommunication, Civil construction companies and Power Electricity such as SIEMENS, NSN, NOKIA, ZTE, ERICSON, ALU, NEC AND HUAWEI, ABB, SCHNEIDER, TORISHIMAGUNA provide an assured capability in handling project in all business environment.
OCCUPATIONAL HEALTH, SAFETY AND ENVIRONMENT POLICYCommitted to Occupational Health, Safety and Environment (OHSE) as a core value of the corporation and as an integral part of our business activities in protecting employees, customers and stake holders.We adopt the international standards methodology and its implementation of Safety, Health and Environment in our daily operations.
CONTINUOUS QUALITY IMPROVEMENT POLICYCommitted to continuous quality improvement, by using continuous quality improvement methodology and implementing the best practices across disciplines and business area.
-
● President Director : Sawaluddin Toelle● Marketing and
Sales Director : Happy Salawangi● Project Director : Misno● Project Manager : Sugeng Triyono● Sales Respentative : Dedi Armen● Technical Manager : - Misno
- Tata Supriyatna● Head Engineer : Yulianto● Field Engineer : Habib Nur Hamdi● Logistic &
Warehouse : Suba ● Project Control : Afrizal S. E
● Civil Engineeer : Fernando Simangunsong.STA● HSE : Hermayadi● QAQC Manager : Budi Kurniawan● Human Resources : Johnny Pattipeilohy● Finance Manager : Teddy Pribaddy● Commercial : Reza Hadi● Field Personnel : Wiwin Saputra
BUSINESS ORGANIZATION
-
Description Remarks
Notary Decree EVA SARI HUTAJULU, SH, Mkn
Notary Deed No. 11
Tax No (NPWP) 74.442.853.3-121.000
Trade License (SIUP) 0298 / 0052 /1. 1.2107/01/2016
Company Registration (TDP) 02.12.1.46.24161/0081/0457/01/2016
Ministry of Law & Human Right AHU-3584916. AH. 01. 11.TH.2015
Telekomunikasi, Electrical, Civil Construction and General Supplier
Scope: Telecommunication, Low, Medium and High Voltage Electrical, Tower Civil Construction Planning, Installation, Integration, Maintenance and main power supply
LEGAL CERTIFICATION
NO
1
2
3
4
5
6
7
-
COMPANY ADDRESS
Head office :PT Galang Solusi TeknikJl. Symphoni Raya Blok HX-1 No.127Bekasi-Jawa Barat 17214
Branch office:PT Galang Solusi TeknikJl. Duren Tiga Buntu No.38A, Jakarta Selatan
Branch office:PT Galang Solusi TeknikJl. Mangga III/E366 Sidoarjo - Jawa Timur
Branch office:PT Galang Solusi TeknikJl lokasi no 27 desa bangun sari kec tanjung morawa kab deli serdang Sumatera Utara
Branch office:PT Galang Solusi TeknikJl. pajar permai KM 11 komplek perubahan bumi semaja indah no 9, Alang - alang Lebar Kota Palembang
-
TELCO PROJECT PHOTOS
MAINTENANCE INDOSAT WONOTIRTO
-
TELCO PROJECT PHOTOS
-
TELCO PROJECT PHOTOSClosing Data and Dismantle ISAT PROJECT
-
TELCO PROJECT PHOTOS
MXSERIES
ACX SERIES
DEPLOYMENT ROUTER JUNIPER SMARTFREN/NEC/PMN
-
TELCO PROJECT PHOTOS
Dismantle STP Sunrise at Site Beringin Siantar
-
Design System
Installed TP5000
TELCO PROJECT PHOTOS
-
Project Site Martoba Siantar Alita XL
TELCOPROJECTPHOTOS
-
ANTENNA AND ODU INSTALLED ANTENNA
Deployment Microwave Transmission : Indosat / XL / Smartfren / Alita / NEC
TELCO PROJECT PHOTOS
-
TELCO PROJECT PHOTOS
Project HOP Base Site Taba - Area Sumatera Selatan
-
TELCO PROJECT PHOTOS
Installed Rectifier & Battery
DC Current Measurement
Deployment Rectifier and Battery Indosat / Smartfren
-
Deployment Swap Microwave SRT1F Indosat
TELCO PROJECT PHOTOS
-
Logistic (Warehousing and Delivery to Site) Alita / NEC
Kitting and Delivery Preparation
Challenging Handery to Hill Site
TELCO PROJECT PHOTOS
-
Resource Supply ICT Teams ASIAN GAMES Palembang NEC
TELCO PROJECT PHOTOS
-
TELCO PROJECT PHOTOS
Reward from NEC for IT Infrastructure on 18th ASIAN GAMES 2018.
-
TELCO PROJECT PHOTOS TAKE HOP BASE (FATP,ATP) - SITE LINAU
-
TAKE DATA NETGEAR - SITE TEIMURJO
TELCO PROJECT PHOTOS
-
TELCO PROJECT PHOTOSPROJECT HOP BASE ( FATP,NG INSTALL, NG DISMANTLE,
DISMANTLE,ATP ) SITE NAME IPUH
-
TELCO PROJECT PHOTOS
PROJECT HOP BASE (FATP,ATP) -SITE HIBRIDA
-
TELCO PROJECT PHOTOSDISMANTLE IDU DTS - SITE NAME RAMBUNG MERAH SIANTAR
-
TELCO PROJECT PHOTOS TROUBLESHOOT & NETGEAR - SITE
PAJARAKAN
-
TELCO PROJECT PHOTOS TAKE DATA ATP AND DISMANTLE
SITE 11MEN053 Modong
-
TELCO PROJECT PHOTOS
Site Name - Naga Huta
Dismantle STP Sunrise
-
Site Pemulutan - Photo ATP, DM, Netgear and FATP ISAT Project
-
Site Balong - Installation Pointing NMSTELCO PROJECT PHOTOS
-
TELCO PROJECT PHOTOS Site - HOTEL SWARNA DWIPA
(Palembang) Dismantle / Netgear
-
TELCO PROJECT PHOTOS
INSTALLATION IDU - INDOSAT PROJECT
-
TELCO PROJECT PHOTOS Installation On Site - Bukit Besar (Palembang)
-
TELCO PROJECT PHOTOSISAT PROJECT - Site INDRALAYA_BARU
Connection Link Protection
-
TELCO PROJECT PHOTOS PROJECT INDOSAT Install & Pointing Site Ngusikan - Site Jombatan_JMB
-
TELCO PROJECT PHOTOS
Install Radio Link
Site Tanjung
Rejo
-
TELCO PROJECT PHOTOS
Pointing at Site Ngadirejo Indosat Project
-
TELCO PROJECT PHOTOS MOS DAN INSTALL ON SITE - KANTOR GUBERNUR (SUMSEL)
-
TELCO PROJECT PHOTO Installation at Site Panjen Kidul, Indosat Project
-
TELCO PROJECT PHOTOS
SITE - JL BUMIMANTI
SITE - UNILA
Take data
Mos & Install
(Bandar Lampung)
(Bandar Lampung)
-
TELCO PROJECT PHOTOS
Troubleshoot at Site Pahoman_PJK (Indosat), Bandar Lampung
-
TELCO PROJECT PHOTOSNetgear and Dismantle at Site Belinyu (South Sumatera)
-
TELCO PROJECT PHOTOS
Troubleshoot, Mos and Installation - Site Sukarami_PLG
-
TELCO PROJECT PHOTOS
Documentation ATP at Site Tempilang
-
TELCO PROJECT PHOTOS
Fiber Optic Splicing
Doc.
INDOSAT PROJECT
-
Installation Fiber Optic
TELCO PROJECT PHOTOS West Kalimantan - XL Project
-
Charity Program for the public
during Covid - 19 pandemic.
- 1 Unit Ambulance- Acces road construction along 100 meters
-
CLIENT END USER
1
2
3
4
POWER PROJECT EXPERIENCE LIST
PT Cikarang Listrindo Extension Phase IVBInstallation of additional MV Panels & Commissioning 150kV Switchyard Phase IVB, Transformer, Relay, Safety & Control Devices
PT. SIEMENS INDONESIA
PT. Cikarang Listrindo
150 kV Substation Semen TubanConstruction, Test and commissioning 150 kV Substation
PT. SIEMENS INDONESIA PTDH
PT. SEMEN TUBAN
PT Cikarang Listrindo Extension Phase VIConstruction & Commissioning 150 kV Switchyard, MV/LV Power Distribution System ( Transformer, Busduct, MV Switchgear, LV Switchboard), Substation Automation System
PT. SIEMENS INDONESIA
PT. Cikarang Listrindo
115 kV GIS Siemens type 8DN8-26 Bays at Amole Site and 5 bays at Power Plant C Construction and Testing
PT. SIEMENS INDONESIA
Freeport Indonesia
-
CLIENT END USER
5
6
POWER PROJECT EXPERIENCE LIST
Paiton Power Generation Unit 5 & 6 Power, East JavaMaintenance Circuit Breaker Analyzer & Inspection GIS 500 kV : Trafo 760 MVA, Busduct 21kV & Generator Star Point
PT. Siemens Indonesia PTD Division
YTL JAVA POWER
PLTU TANJUNG JATI 2 Maintenance HV Equipment, 150 kV and 500 kV GIS Switchyard
PT. Siemens Indonesia PTD
PLTU TANJUNG JATI 2
Brawijaya Hospital Saharjo Electronic - Tebet, South Jakarta
Substation 150 kV Topoyo (New) - Topoyo, South Sulawesi
PT. Panata Bayu Nugraha
Brawijaya Hospital
PT. ABB Sakti Industri
PT. PLN (PERSERO)
7
8
7
-
CLIENT END USER
9 North Duri Cogeneration Plant, Chevron, Riau1. Major Overhaul Gas Turbine Generator Unit 1,2,3 ([email protected])2. Electrical & Instrument Combustion Inspection TG Unit 1,2,3
PT. Siemens Infonesia PTDH
MCTN Chevron
10 PLTGM Payo Selincah JambiConstruction & Testing 150 kV Substation trafo bay PT. ABB Sakti IndustriPT PLN
PT. HEIN GLOBAL UTAMA
PT. Tanjung Power Indonesia
SORIK MERAPI GEOTHERMAL PROJECT150 kV Transmission Line & Substation (Civil, Mechanical, Electrical erection & Testing Commissioning
Huadong China
PT. SMGP
11
12
TANJUNG TABALONG KALSEL2x100MW Coal Fired Power Plant Construction & Testing(Power Transformer, LV & MV Switchgear, Insulation Phase Busduct, cable tray / cable race way, cable pulling, cable Termination, Lighting system, Fire Alarm system & Instrumentation)
POWER PROJECT EXPERIENCE LIST
-
CLIENT END USER
13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis
14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project
PT. ABB Sakti Industri
PT. Supreme Energy Muara Laboh (SEML)
PT. Torishimaguna
Sarulla Operation Ltd NIL-North Sumatera
150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)
15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna
Sarulla Operation Ltd SIL-North Sumatera
16
POWER PROJECT EXPERIENCE LIST
-
CLIENT END USER
17150 kV Substation - CVT Hotspot :
● 150 kV Ciamis Substation ● 150 kV Pandean Lamper Substation - Semarang● 150 kV Tambak Lorok Substation - Semarang● 150 kV Blora Substation● 150 kV Karawang Substation ● 150 kV Haurgelis Substation● 150 kV banjar Substation ● 150 kV Cianjut Substation
PT.ABB Sakti Industri
PT.PLN (PERSERO)
POWER PROJECT EXPERIENCE LIST
CLIENT END USER
13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis
14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project
PT. ABB Sakti Industri
PT. Supreme Energy Muara Laboh (SEML)
PT. Torishimaguna
Sarulla Operation Ltd NIL-North Sumatera
150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)
15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna
Sarulla Operation Ltd SIL-North Sumatera
16
POWER PROJECT EXPERIENCE LIST
Coal Fired Power Plant Cirebon 2 - West Java : ● Transformer Assembly for 1000MVA/500kV● Oil Purification ● Testing
For : GSUT - 1000MVA-22kV/500kV, SAT1 65MVA-22kV/11kV, SAT2 65MVA-500kV/11kV
WIFGASINDO DINAMIKA INSTRUMENT ENGINEERING.PT
PT. Cirebon Power18
-
CLIENT END USER
19GIS 150kV Geothermal Rantau Dedap, South Sumatera :
● GIS Container + Accessories● Steel Structure, Gantry, Conductor, String Set and Steel Support● 150kV LA & 150 kV CVT● LV - MV Control Cable Work & Fiber Optic● CRP, SAS, Telecommunication Equipment, DFR, Energy Meter Panel● Fiber Optic Installation and Splicing● Grounding Work● Test and Commisioning
PT.ABB Sakti Industri
PT. Supreme Energy Rantau Dedap
POWER PROJECT EXPERIENCE LIST
CLIENT END USER
13 MUARA LABOH, SOLOK - West SumateraGeothermal Power Plant, 150kV Substation (Erection, Testing & Commis
14 Sarula Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula NIL - 1 & 2 Project
PT. ABB Sakti Industri
PT. Supreme Energy Muara Laboh (SEML)
PT. Torishimaguna
Sarulla Operation Ltd NIL-North Sumatera
150 kV EXTENSION GI New Balaraja - Tangerang West Java PT. ABB Sakti IndustriPT. PLN (PERSERO)
15 Sarulla Geothermal Power Plant-Sarula North Sumatra Electrical Maintenance Sarula SIL ProjectPT. Torishimaguna
Sarulla Operation Ltd SIL-North Sumatera
16
POWER PROJECT EXPERIENCE LIST
20 500kV HV Apparatus, Klaten - Central Java :Installation Include Individual Test
PT. ABB Power Grides Indonesia
PT. PLN (PERSERO)
21 66kV Pad AA Substation Sorik Marapi : HDEC Power ChinaSorik Marapi Geothermal Power
-
GIS (Gas Insulated Switchgear) - Erection & Test Commissioning❏ SIEMENS - 8DN8-II
(FREEPORT-PROJECT) 115kV GIS Installation & CommissioningPower project photos
-
Power project photosAIS (Air Insulated Switchgear) - Erection & Test Commissioning CIKARANG LISTRINDO PROJECT PHASE-VB/150 kV Gantry/Beam assembly/CB/Trafo.
Brawijaya Saharjo Hospital - Tebet, South Jakarta PT.PANATA BAYU NUGRAHAMechanical Electrical Installation
-
TANJUNG TABALONG KALSEL PROJECT 150 kV KALSEL Switchyard & Transmission Line / Tower Foundation
GIS (Gas Insulated Switchgear) - Erection & Test CommissioningSiemens-8DN8 Switchgear (OKI-PULP & PAPER PROJECT)
Power project photos
-
Power project photosAIS (AIR INSULATED SWITCHGEAR) - ERECTION & TEST COMMISSIONINGCIKARANG LISTRINDO PROJECT PHASE-VB / MV CABLE / 150 kV CABLE/ TRAFO / GCB
-
500 kV GIS Refurbishment Work - Erection & Test Commissioning Hitachi GIS 500 kV - PT.PAITON ENERGY - IPMOMI
Power project photos
-
Pow
er p
roje
ct p
hoto
s SORIK MARAPI GEOTHERMAL PROJECT150 kV SMGP Switchyard & Transmission Line / Tower Erection
SARULLA OPERATION LTD-GEOTHERMAL POWER PLANT150 kV SMGP Switchyard & Transmission Line / Tower Erection
-
Power project photosSARULLA OPERATION LTD-GEOTHERMAL POWER PLANTElectrical Inspection & Maintenance Sarulla SIL - Project
-
Power project photos
150 kV Extension GI New Balaraja - Tangerang - West Java PT. ABB Sakti IndustriMechanical Electrical installation
-
Power project photos
SUBSTATION 150 kV TOPOYO (new) SOUTH SULAWESI PT.ABB SAKTI INDUSTRIMechanical Electrical Installation
-
Power project photos
150 kV CVT HOTSPOT - 150 kV SUBSTATION PT. ABB SAKTI INDUSTRIMechanical Electrical Installation & Testing
-
Power project photos
Project : Cirebon 2, 1x1000MW Coal Fired Project, Indonesia
1000MVA Transformer Installation, Oil Purification and Testing
-
Power project photos
Project : Rantau Dedap Geothermal Power ProjectInstallation & Testing GIS 150kV
-
Power project photos
500kV HV Apparatus, Installation Include Individual Test - Klaten ( Central Java )
Installation & Testing
-
Power project photos
66kV Pad AA Substation
Sorik Marapi
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
COMPANY Certificate and Legalicy
-
“We believe that by providing valuables deliverables to
customers will creates company’s growth”
Find us on :
Thanks for your time
GalangSolusiTeknikptgst.id @gstofficial__ @gstofficial__
Hopefully we can be partner in future