Coba Rehab Irigasi Seunebok - Baru

Post on 09-Jan-2016

215 views 0 download

description

Coba Rehab

Transcript of Coba Rehab Irigasi Seunebok - Baru

7/17/2019 Coba Rehab Irigasi Seunebok - Baru

http://slidepdf.com/reader/full/coba-rehab-irigasi-seunebok-baru 1/1

Nama Pekerjaan : Rehabilitasi Saluran D.I Seunubok Bace Kampung Seunubok Aceh 200 M

Lokasi : Kecamatan Bendahara

Tahun Anggaran : 2012

Sumber Dana : Dana Alokasi Khusus (DAK)

HARGA SATUAN JUMLAH HARGA

( Rp )  ( RP )

I. PEKERJAAN PERSIAPAN

1. Pembersihan Lapangan 1.00  Ls Ls 2,000,000.00Rp 2,000,000.00Rp

2. Pengukuran dan Pemasangan Bowplank 1.00  Ls Ls 2,000,000.00Rp 2,000,000.00Rp

3. Pondok Kerja 1.00  Ls Ls 2,500,000.00Rp 2,500,000.00Rp

4. Papan Nama Proyek 1.00  Ls Ls 500,000.00Rp 500,000.00Rp

Sub Jumlah I 7,000,000.00Rp

II. PEKERJAAN SALURAN 200 M'

1. Galian Tanah 40.00  M3 A.1 47,437.50Rp 1,897,500.00Rp

2. Meratakan Tanah hasil galian 34.48  M3 A.16. 15,950.00Rp 549,956.00Rp

3. Beton Cor 1 : 3 : 5 74.00  M3 G.44 956,822.50Rp 70,804,865.00Rp

4. Balok Pengaku 1 : 3 : 5 1.28  M³ Supl. V.b 6,910,247.50Rp 8,845,116.80Rp

5. Acian 300.00  M2 SNI 2837 2008 26,784.38Rp 8,035,312.50Rp

6. Kayu Mal 0.60  M3 Ls 5,280,000.00Rp 3,168,000.00Rp

Sub Jumlah II 93,300,750.30Rp

III. PEKERJAAN BOX BAGI 3 BH

1. Galian Tanah 1.89  M3 A.1 47,437.50Rp 89,656.88Rp

2. Beton Cor 1 : 3 : 5 6.59  M3 G.44 956,822.50Rp 6,303,546.63Rp

3. Acian 15.96  M2 SNI 2837 2008 26,784.38Rp 427,478.63Rp

4. Kayu Mal 0.30  M3 Ls 5,280,000.00Rp 1,584,000.00Rp

5. Pintu Angkat Plat Besi (4 mm) Untuk Box Bagi 6.00  Bh Ls 1,000,000.00Rp 6,000,000.00Rp

Sub Jumlah III 14,404,682.13Rp

IV. PEKERJAAN BOX CULVERT 1 UNIT

1. Galian Tanah 16.20  M3 A.1 47,437.50Rp 768,487.50Rp

2. Tanah Timbun Didatangkan 17.00  M3 A.16 + H.Tanah 132,350.00Rp 2,249,950.00Rp

3. Beton Cor 1 : 3 : 5 3.30  M3 G.44 956,822.50Rp 3,157,514.25Rp

4. Beton Bertulang 1 : 3 : 5 7.30  M3  Supl. V.b 6,910,247.50Rp 50,444,806.75Rp

5. Acian 11.50  M2 SNI 2837 2008 26,784.38Rp 308,020.31Rp

Sub Jumlah VI 56,928,778.81Rp

V. PEKERJAAN GORONG-GORONG 1 UNIT

1. Galian Tanah 5.00  M3 A.1 47,437.50Rp 237,187.50Rp

2. Buis Beton Ø 60 Cm 7.00  Bh Ls 144,000.00Rp 1,008,000.00Rp

3. Beton Cor 1 : 3 : 5 3.00  M3 G.44 956,822.50Rp 2,870,467.50Rp

4. Pekerjaan Penimbunan 4.00  M3 A.16.+ H. Tanah 132,350.00Rp 529,400.00Rp

Sub Jumlah V 4,645,055.00Rp

VI. PEKERJAAN LAIN-LAIN

1. Pembersihan Akhir 1.00  Ls 2,500,000.00Rp 2,500,000.00Rp

2.   As Built Drawing 1.00  Ls 2,500,000.00Rp 2,500,000.00Rp

Sub Jumlah VI 5,000,000.00Rp

DAFTAR KUANTITAS DAN HARGA

NO URAIAN PEKERJAAN VOLUME ANALISA