AngkutBIAYA JARAK ANGKUTKEC. MUAT40KM/JAMKEC. KOSONG60KM/JAMDUMP TRUCK0Rp/JamBiaya OperasionalSupir0Rp/JamPembantu Supir0Rp/JamTotal Sewa DT0Rp/JamKapasitas DT4m3JARAKMUATANGKUTBALIKWAKTUBIAYA ANGKUTBIAYA ANGKUTAN. BYkmmenitmenitmenitmenitRp.Rp./m3/Km101015103500B.10201030206000B.20301045308500B.304010604011000B.405010755013500B.506010906016000B.6070101057018500B.7080101208021000B.8090101359023500B.901001015010026000B.1001101016511028500B.1101201018012031000B.1201301019513033500B.1301401021014036000B.1401501022515038500B.150PERHITUNGAN BIAYA ANGKUT DAN PERHITUNGAN HARGA ASPALDAN ANALISA PENGGUNAAN ALAT BANTU (M.170) TAHUN 2014A. PERHITUNGAN BIAYA ANGKUTB. PERHITUNGAN BIAYA ASPALKET.NO.JARAK (KM)HARGA (Rp.)NO.JARAK (KM)HARGA ASPAL + ONGKOS (Rp.)1