PERHITUNGAN BIAYA ANGKUT DAN PERHITUNGAN HARGA ASPAL DAN ANALISA PENGGUNAAN ALAT BANTU (M.170) TAHUN 2014 A. PERHITUNGAN BIAYA ANGKUT B. PERHITUNGAN BIAYA ASPAL NO. JARAK (KM) HARGA (Rp.) NO. JARAK (KM) 1 < 10 KM 3,165.00 1 < 10 KM 13,036.55 2 < 20 KM 2,713.00 2 < 20 KM 13,051.14 3 < 30 KM 2,562.00 3 < 30 KM 13,065.72 4 < 40 KM 2,487.00 4 < 40 KM 13,080.31 5 < 50 KM 2,442.00 5 < 50 KM 13,094.90 6 < 60 KM 2,412.00 6 < 60 KM 13,109.48 7 < 70 KM 2,390.00 7 < 70 KM 13,124.07 8 < 80 KM 2,374.00 8 < 80 KM 13,138.66 9 < 90 KM 2,361.00 9 < 90 KM 13,153.24 10 < 100 KM 2,351.00 10 < 100 KM 13,167.83 11 < 110 KM 2,343.00 11 < 110 KM 13,182.42 12 < 120 KM 2,336.00 12 < 120 KM 13,197.00 13 < 130 KM 2,330.00 13 < 130 KM 13,211.59 14 < 140 KM 2,326.00 14 < 140 KM 13,226.18 15 < 150 KM 2,321.00 15 < 150 KM 13,240.76 ANALISA ALAT BANTU (M.170) BIAYA ANALISA ALAT BERAT (AN. E) (Rp.) NO. KODE HARGA K 210 211 221 232 422 ### 1 E.001 417,942.80 K 522 520 110 111 411 2 E.010 340,948.59 242 311 621 515 224 3 E.031 529,795.92 342 124 026 614 4 E.040 207,179.10 512 625 421 035 040 025 5 E.052 269,246.49 321 225 341 514 521 424 ### 6 E.053 246,838.66 528 618 612 880 626 629 7 E.080 170,622.20 881 620 616 615 636 641 ### 8 E.081 405,700.57 K 719 720 705 730 722 9 E.082 358,118.24 112 725 810 719 ### 10 E.084 355,540.30 K 815 715 ### 11 E.087 338,894.83 K 710 ### 12 E.088 38,830.06 13 E.089 32,686.46 14 E.153 62,634.13 15 E.154 52,539.80 16 E.155 3,767,463.13 17 E.157 871,547.32 18 E.182 162,981.66 19 E.211 166,604.04 20 E.212 260,587.12 21 E.213 327,612.12 22 E.221 320,560.55 E.222 86,250.00 23 E.251 17,343.34 24 E.252 31,264.31 25 E.253 56,666.83 26 E.301 118,389.12 27 E.341 31,516.70 HARGA ASPAL + ONGKOS (Rp.) KODE ANL

description

yyyyyyyyyyyyyyyy

Transcript of CCO Plat Beton

AngkutBIAYA JARAK ANGKUTKEC. MUAT40KM/JAMKEC. KOSONG60KM/JAMDUMP TRUCK0Rp/JamBiaya OperasionalSupir0Rp/JamPembantu Supir0Rp/JamTotal Sewa DT0Rp/JamKapasitas DT4m3JARAKMUATANGKUTBALIKWAKTUBIAYA ANGKUTBIAYA ANGKUTAN. BYkmmenitmenitmenitmenitRp.Rp./m3/Km101015103500B.10201030206000B.20301045308500B.304010604011000B.405010755013500B.506010906016000B.6070101057018500B.7080101208021000B.8090101359023500B.901001015010026000B.1001101016511028500B.1101201018012031000B.1201301019513033500B.1301401021014036000B.1401501022515038500B.150PERHITUNGAN BIAYA ANGKUT DAN PERHITUNGAN HARGA ASPALDAN ANALISA PENGGUNAAN ALAT BANTU (M.170) TAHUN 2014A. PERHITUNGAN BIAYA ANGKUTB. PERHITUNGAN BIAYA ASPALKET.NO.JARAK (KM)HARGA (Rp.)NO.JARAK (KM)HARGA ASPAL + ONGKOS (Rp.)1