PROGRAM : PENGEMBANGAN DESTINASI PARIWISATA
KEGIATAN : PENGEMBANGAN SARANA DAN PRASARANA PARIWISATA
PEKERJAAN : PEMBANGUNAN KONSTRUKSI KOLAM RENANG DAN TERAPI AIR PANAS
LOKASI : KOMPL. HWB PINANG AWAN, KEC. PAUH DUO KAB. SOLOK SELATAN
A. KOLAM RENANG
I PEKERJAAN PENDAHULUAN 17,223,156.72Rp
II PEKERJAAN TANAH 11,116,435.18Rp
III PEKERJAAN BETON 756,697,846.94Rp
IV PEKERJAAN TRENCH PIPA 15,105,895.06Rp
V PEKERJAAN SALURAN LIMPASAN 16,757,385.23Rp
VI PEKERJAAN LANTAI SELASAR 24,341,739.44Rp
VII PEKERJAAN KERAMIK LANTAI DAN GRILL BETON 229,420,481.60Rp
VIII PEKERJAAN INSTALASI AIR BERSIH 21,066,367.57Rp
B. BANGUNAN UTAMA
I PEKERJAAN PENDAHULUAN 4,858,621.32Rp
II PEKERJAAN PONDASI 30,618,789.91Rp
III PEKERJAAN BETON DAN STRUKTUR 156,502,385.38Rp
IV PEKERJAAN DINDING DAN KUZEN 143,352,765.74Rp
V PEKERJAAN KAP ATAP 106,052,234.24Rp
VI PEKERJAAN PLAFOND 89,303,781.13Rp
VII PEKERJAAN LANTAI 94,032,255.15Rp
VIII PEKERJAAN PINTU DAN JENDELA 36,537,197.48Rp
IX PEKERJAAN FINISHING 22,737,788.04Rp
X PEKERJAAN INSTALASI LISTRIK 10,615,000.00Rp
XI PEKERJAAN SANITAIR 15,886,978.58Rp
XII PEKERJAAN RABAT KELILING BANGUNAN 15,956,687.25Rp
A. JUMLAH BIAYA FISIK 1,818,183,791.94Rp
B. PPN 10% 181,818,379.19Rp
C. TOTAL JUMLAH ( A + B ) 2,000,002,171.14Rp
D. DIBULATKAN 2,000,000,000.00
TERBILANG : DUA MILYAR RUPIAH
Batusangkar, 28 Juni 2013
Penawar
CV. INDOMO RAJA SAKTI
ttd
Ir. FERRY ERIANDY
Wakil Direktur
R E K A P I T U L A S I
NO. LINGKUP PEKERJAAN JUMLAH (Rp.)
REKAP