RENCANA ANGGARAN BIAYA INSTALASI PENERANGAN PABRIK
NO MATERIAL SPESIFIKASI TEKNIS SATUAN VOLUME HARGA SATUANLAMPU
I.1 LAMPU 1 LHE PHILIPS ESSENSIAL 54 W, BUAH 270
I.2 LAMPU 2 BUAH 45
KABEL2.1 NYA MERAH SUPREME 1,5 MM2 ROL
PIPA PVC3.1 PIPA DIA 0,5 MASPION 0,5 DM BATANG 25
PENGAMAN4.1 MCB 4A, 1,25 KA BUAH 124.2 MCB
SAKLAR5.1 SAKLAR GANDA 250 V/ 10 A BUAH 1005.2 SAKLAR TUNGGAL
ACCESORIES6.1 T DOS
TL 80 W; 0,5; PHILIPS INCLUDE ARMATURE
kyranna:INCLUDE TRASNPORTASI, PEMASANGAN, KOMISIONING, ASURANSI, PROFIT PERUSAHAAN