RENCANA ANGGARAN BIAYA INSTALASI PENERANGAN PABRIK NO MATERIAL SPESIFIKASI TEKNIS SATUAN VOLUME HARGA SATUAN LAMPU I.1 LAMPU 1 LHE PHILIPS ESSENSIAL 54 W, BUAH 270 I.2 LAMPU 2 BUAH 45 KABEL 2.1 NYA MERAH SUPREME 1,5 MM2 ROL PIPA PVC 3.1 PIPA DIA 0,5 MASPION 0,5 DM BATANG 25 PENGAMAN 4.1 MCB 4A, 1,25 KA BUAH 12 4.2 MCB SAKLAR 5.1 SAKLAR GANDA 250 V/ 10 A BUAH 100 5.2 SAKLAR TUNGGAL ACCESORIES 6.1 T DOS TL 80 W; 0,5; PHILIPS INCLUDE ARMATURE kyranna INCLUDE PEMASANG ASURANSI PERUSAHA
-
Upload
inggrit-izzatul-aini -
Category
Documents
-
view
25 -
download
0
description
Rencana Anggaran Biaya
Transcript of tugas RAB
RENCANA ANGGARAN BIAYA INSTALASI PENERANGAN PABRIK
NO MATERIAL SPESIFIKASI TEKNIS SATUAN VOLUME HARGA SATUANLAMPU
I.1 LAMPU 1 LHE PHILIPS ESSENSIAL 54 W, BUAH 270
I.2 LAMPU 2 BUAH 45
KABEL2.1 NYA MERAH SUPREME 1,5 MM2 ROL
PIPA PVC3.1 PIPA DIA 0,5 MASPION 0,5 DM BATANG 25
PENGAMAN4.1 MCB 4A, 1,25 KA BUAH 124.2 MCB
SAKLAR5.1 SAKLAR GANDA 250 V/ 10 A BUAH 1005.2 SAKLAR TUNGGAL
ACCESORIES6.1 T DOS
TL 80 W; 0,5; PHILIPS INCLUDE ARMATURE
kyranna:INCLUDE TRASNPORTASI, PEMASANGAN, KOMISIONING, ASURANSI, PROFIT PERUSAHAAN