RETROFITTING SDN 42 - GEDUNG "D"KECAMATAN KORONG GADANG, PADANG
DAFTAR GAMBAR:
G.01 LEMBAR JUDULG.02 CATATAN UMUMG.03 CATATAN UMUMG.04 CATATAN UMUM
A.01E EKSISTING DENAH RUANG KELASA.02E EKSISTING TAMPAK BARAT DAN SELATANA.03E EKSISTING TAMPAK TIMUR DAN UTARAA.04E EKSISTING POTONGANA.01R RETROFIT DENAH RUANG KELASA.02R RETROFIT TAMPAK BARAT DAN SELATANA.03R RETROFIT TAMPAK TIMUR DAN UTARAA.04R RETROFIT PINTU DAN JENDELA 1A.05R RETROFIT PINTU DAN JENDELA 2A.06R RETROFIT PINTU DAN JENDELA 3A.07R RETROFIT PINTU DAN JENDELA 4A.08R RETROFIT PINTU DAN JENDELA 5A.09R RETROFIT PINTU DAN JENDELA 6A.10R RETROFIT PINTU DAN JENDELA 7A.11R RETROFIT PINTU DAN JENDELA 8A.12R RETROFIT PINTU DAN JENDELA 9A.13R RETROFIT PINTU DAN JENDELA 10
S.01R RETROFIT DENAH GUDANG DAN KELAS 1S.02R RETROFIT DENAH KELAS 2 DAN KELAS 3S.03R RETROFIT DENAH KELAS 4S.04R RETROFIT DENAH PONDASI GUDANG DAN KELAS 1S.05R RETROFIT DENAH KELAS 2 DAN KELAS 3
S.06R RETROFIT DENAH PONDASI KELAS 4
S.07R RETROFIT RENCANA RING BALOK /BRACING GUDANG DAN KELAS 1
S.08R RETROFIT RENCANA RING BALOK /BRACING KELAS 2 DAN KELAS 3
S.09R RETROFIT RENCANA RING BALOK /BRACING KELAS 4S.10R RETROFIT DENAH ATAP GUDANG DAN KELAS 1S.11R RETROFIT DENAH ATAP KELAS 2 DAN KELAS 3S.12R RETROFIT DENAH ATAP KELAS 4S.13R RETROFIT TAMPAK GUDANGS.14R RETROFIT TAMPAK KELAS 1S.15R RETROFIT TAMPAK KELAS 2S.16R RETROFIT TAMPAK KELAS 3
S.17R RETROFIT TAMPAK KELAS 4S.18R RETROFIT TAMPAK SELATANS.19R RETROFIT TAMPAK RANGKA ATAPS.20R RETROFIT DETAIL RANGKA ATAP 1
S.21R RETROFIT DETAIL RANGKA ATAP 2
S.22R RETROFIT DETAIL KOLOM DAN BALOK
S.23R RETROFIT DETAIL
S.24R RETROFIT DETAIL
S.25R RETROFIT DETAIL
S.26R RETROFIT DETAIL
S.27R RETROFIT DETAIL
S.28R RETROFIT DETAIL
S.29R RETROFIT DETAIL
S.30R RETROFIT DETAIL
S.31R RETROFIT DETAIL
S.32R RETROFIT DETAIL
S.33R RETROFIT DETAIL
S.34R RETROFIT DETAIL
S.35R RETROFIT DETAIL
S.36R RETROFIT DETAIL
G.01
LOKASI
U
Ruang Kelas
GedungDJalan Masuk
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
CATATAN UMUM
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
Ruang Kelas
GedungA
Ruang Kelas
GedungB
Ruang Kelas
GedungC
CATATAN UMUM
I. UMUM
A. Desain retrofitting bangunan didasarkan pada gabungan peraturan SNI, SCI, ASCE danMexican Design Standard dengan tujuan untuk meningkatkan kekuatan struktur
bangunan untuk mencapai performa bangunan life-safety (faktor keutamaan gempa II)
B. Kontraktor bertanggung jawab mengkoordinasikan semua pekerjaan yang dilakukan olehpekerja dan memastikan dimensi dan volume pekerjaan sesuai dengan perencanaan.
Ketidaksuaian yang ditemukan antara perencanaan dan pelaksanaan di lapangan harus
diinformasikan secepatnya kepada perencana sebelum pekerjaan lanjutan dilaksanakan.
C. Kontraktor harus menyediakan fasilitas yang diperlukan untuk melindungi dan
mendukung pelaksanaan konstruksi, dimana termasuk, namun tidak terbatas pada:bracing dan perancah untuk menahan beban selama proses konstrusi berlangsung.
D. Kontraktor, pihak sekolah dan dinas pendidikan harus melaporkan pada design engineer
jika di lapangan ditemukan kondisi yang tidak sesuai dan menyebabkan tidakmungkinnya perencanaan awal pekerjaan dilaksanakan.
E. Kontraktor harus memastikan keamanan lokasi konstruksi untuk mencegah segala
bentuk bahaya dan kecelakaan pada pekerja, siswa, pengawas dan masyarakat yangberada di sekitar lokasi konstruksi dan untuk mencegah terjadinya kerusakan yang tidak
diinginkan selama proses konstruksi berlangsung.
II. PONDASI
A. Hasil peninjauan pada pondasi dilakukan secara visual. Jenis tanah di nilai berdasarkan
hasil investigasi level 1 (dilakukan secara sederhana) yang dilakukan pada tanggal 30
September 2016.
B. Hasil investigasi menunjukkan bahwa tidak ada indikasi yang menujukkan potensi
terjadinya likuifaksi pada bangunan. Tidak ada kerusakan signifikan pada pondasi
bangunan dan pondasi ditemukan dalam kondisi baik. Tidak ada perbaikan yang perludilakukan pada pondasi.
III. FORMWORK (KONSTRUKSI PENUNJANG)
A. Material yang digunakan sebagai konstruksi penunjang harus dalam keadaan yang baik,lurus dan tidak bengkok.
B. Konstruksi penunjang harus dipasang dengan baik untuk mencegah terjadinya rembesan
adukan semen.
C. Konstruksi penunjang harus dijepit/ditahan/diikat untuk menjaga agar berada tetappada posisi yang telah direncanakan dan tidak bergerak.
D. Tepat sebelum adukan beton dituang ke dalam bekisting, semua bekisting bagian dalam harus
dibasahi dengana air.
E. Gunakan waterpass atau alat lainnya untuk memastikan bahwa bekisting lurus dan tidak miring.
F. Gunakan pengaku secukupnya untuk memastikan bahwa bekisting tetap berada pada posisi
yang telah direncanakan.
G. Jangan bongkar pengaku dan penopang lainya sebelum:
1. Untuk pengaku vertikal dan horizontal, penopang ring balok : 3 hari
2. Untuk pengaku pondasi : 2 hari
H. Lakukan perbaikan jika terdapat lubang pada beton DALAM WAKTU 3 hari setelah bekisting
dilepas, dengan ketentuan sebagai berikut:
1. Segera beritahukan kepada pengawas dan disain engineer untuk melakukan peninjauan
dan meminta persetujuan untuk melakukan langkah perbaikan selanjutnya
2. Untuk lubang yang menyebabkan tulangan terekspos, beton hars dibobok secara
keseluruhan dan beton harus dicor kembali.
3. Untuk lubang yang tidak menyebabkan tulangan terekspos, maka lubang harus diisi
dengan menggunakan mortar yang memiliki kuat tekan rencana yang sama dengan beton.
IV. BAJA TULANGAN
A. Tulangan longitudinal harus menggunakan tulangan ulir ukuran SNI (U-32) kecuali dinyatakan
lain dalam perencanaan.
B. Tulangan yang diberikan dalam perencanaan harus mengikuti aturan berikut:
1. Tulangan yang digunakan harus bebas dari karat. Beton dari coran sebelumnya
(beton existing) harus dibersihkan dengan menggunakan gundar besi sebelum betonbaru dicor.
2. Tulangan tidak dalam keadaan bengkok secara permanen.
C. Pastikan semua bengkokan mengikuti standar minimum bengkokan SNI, kecuali
dinyatakan lain pada gambar desain.
D. Usahakan penulangan memiliki overlap seminimal mungkin, jika tidak bisa dihindarisepenuhnya. Jika overlap tidak bisa dihindari, panjang overlap minimal adalah 40D.
E. Sediakan penopang yang dibutuhkan untuk memastikan kestabilan dan posisi tulangan
sebelum pengecoran.
G.02
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
CATATAN UMUM
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
CATATAN UMUM (SAMBUNGAN)
F. Gunakan spacer (beton tahu) dengan ukuran 40x30x30 mm (40 mm merupakan tebal selimut beton) untuk
memastikan ketebalan selimut beton yang baik. Adukan spacer harus sama dengan adukan beton rencana.
G. Untuk perkuatan kawat anyam, gunakan kawat anyam tipe persegi diameter 1 mm, dengan ukuran spasi
25 mm x 25 mm.
V. HORIZONTAL BRACING
A. Gunakan baja kanal C.75.100 (setara TASO SNI) untuk struktur utama rangka horizontalbracing.
B. Gunakan angkur L diameter 12 mm dan panjang 120 mm untuk pengangkuran rangkahorizontal bracing.
C. Gunakan baja UNP tebal 6 mm, 80 mm x 45 mm untuk pengangkuran horizontal bracing ke
ring balok.
D. Gunakan plat baja galvanis tebal 1mm dan 2mm untuk sambungan antar rangka horizontal
bracing.
E. Gunakan baut #10 untuk koneksi horizontal bracing
VI. BETON, MORTAR DAN PLASTER
A. Bagian struktur beton bertulang harus didasarkan pada kuat tekan beton minimal struktur
sebesar 17.6 MPa (setara dengan K-225) pada umur beton 28 hari. Gunakan adukan
semen: pasir : kerikil, dengan rasio 1:2:3, dan rasio air terhadap semen sebesar 0.6 (atau
nilai slump test sekitar 8 - 12 cm).
B. Campuran mortar harus menggunakan rasio campuran semen : pasir 1:2 untuk bagian
trasram dan 1:3 untuk bagian lain)
C. Campuran plasteran harus menggunakan rasio campuran semen : Pasir 1:3 dengan
ketebalan pasangan plaster sebesar 2 cm.
D. Semen yang digunakan adalah portland semen Tipe I, kering dan dari kemasan yang belum
terbuka.
E. Pasir yang digunakan harus berwarna hitam, bersih dari tanah, halus untuk campuran
plaster dan kasar untuk campuran beton.
F. Aggregat ang digunakan berupa batu pecah dengan ukuran kurang dri 2 cm untuk
campuran beton.
G. Air yang digunakan untuk campuran harus bersih, bukan air payau dan tidak berlumpur.
VII. PASANGAN BATU BATA
A. Batu bata harus memiliki kuat tekan minimal yang dicantumkan pada SNI, yakni sebesar 5MPa.
B. Ukuran batu bata yang digunakan harus lebih kurang sama dengan ukuran batu bata yang
digunakan pada dinding existing (lebih kurang 5x9x19 cm)
C. Batu bata yang digunakan harus lurus dan utuh. Batu bata yang patah tidak boleh digunakan
kecuali untuk pengisi bagian tepi dinding.
D. Batu bata harus direndam terlebih dahulu sebelum digunakan.
E. Mortar pada pasangan bata harus memiliki ketebalan sebesar 1,5 - 2 cm.
VII. KAYU DAN RANGKA ATAP
A. Kayu yang digunakan sebagai rangka kuda-kuda atau struktur utama bangunan harus
menggunakan kayu Kelas I (setara Banio).
B. Multipleks yang digunakan pada struktur kuda-kuda harus memiliki ketebalan 12 mm dan
menggunakan bahan kayu keras (setara Meranti).
C. Kayu penunjang bekisting dapat menggunakan kayu kelas II dengan ukuran 5/7,
sementara multipleks yang digunakan harus memiliki ketebalan minimal 9 mm.
D. Paku untuk koneksi sambungan kuda-kuda adalah paku dengan panjang 4, 6 dan 10 cm.
E. Gunakan galvanised strap tebal 1 mm lebar 4 cm untuk sambungan ring balok dan
kuda-kuda.
VIII. INSPEKSI DAN PENGAWASAN
A. Kontraktor haris memberitahukan selambat-lambatnya 48 jam sebelumnya mengenai
pekerjaan yang akan dilakukan agar dapat dilkaukan pengecekan dan inspeksi terhadapmaterial dan kualitas pekerjaan sebagai berikut:
1. Pekerjaan pondasi
a. Perakitan tulangan
b. Keadaan dan persiapan pembongkaran pondasi
2. Beton (sebelum pengecoran)
a. Dimensi dan layout bekisting
b. Pemasangan dan penyambungan angkur dan strap
c. Layout dan posisi pembesian/perakitan tulangan
d. Perakitan tulangan, selimut beton dan pemasangan beton tahu (spacer)
3. Pasangan bata
a. Material - batu bata dan mortar
b. Dimensi dan layout batu bata
c. Ukuran mortar dan susunan pasangan bata
G.03
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
CATATAN UMUM
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
CATATAN UMUM (SAMBUNGAN)
4. Struktur metal
a. Material - mutu dan ketebalan
b. Layout bracing dan perakitan
c. Detail sambungan
5. Struktur kayu
a. Material - mutu dan ukuran
b. Layout dan perakitan
c. Sambungan dan pendetailan
B. Jika engineer menemukan adanya ketidaksesuaian antara pekerjaan yang dilakukan dengan
perencanaan (gambar desain), biaya perbaikan yang dikeluarkan akan ditanggung oleh pihak
kontraktor.
C. Testing - Material yang digunakan oleh kontraktor harus dites dengan adanya pengawasan dari
engineer untuk material sebagai berikut:
1. Batu bata - Untuk setiap tahapan batu bata yang disediakan oleh supplier yang sama, 10 bata
harus di tes untuk setiap 50,000 buah bata yang digunakan (Lihat SNI 15-2094-2000)
2. Beton - Lakukan slump tes untuk setiap adukan beton yang dibuat setiap harinya dengan jumlah
3 hasil slump tes untuk tiap kali pengetesannya. Pengambilan sampel dan pengujian dilakukan
sesuai dengan standar ASTM C-31 dan cetakan slumo sesuai dnegan ASTM C39.
IX. PINTU
A. Bukaan pintu untuk sarana jalan keluar harus sedikitnya memiliki tinggi bersih 200 cm dengan
lebar bersih 80 cm, kecuali jika pada bangunan yang sudah ada sebelumnya, lebar pintu
minimal 70 cm (Lihat SNI 03-1746-2000).
B. Pintu darurat yang disyaratkan dari tipe engsel sisi dan tipe poros ayun harus berayun atau
membuka ke arah lintasan jalan keluar (Lihat SNI 03-1746-2000).
C. Grendel Pintu pada ketinggian 100-120 cm (Lihat SNI 03-1746-2000).
D. Setiap bangunan harus mempunyai minimal 1 jalan keluar dari setiap lantainya. Bangunan
Kelas 9b (Sekolah Dasar) memiliki jarak minimal 2 pintu keluar sejauh 60 m. (Lihat
KEPMENNEG PU NOMOR : 441/KPTS/1998 "PERSYARATAN TEKNIS BANGUNAN
GEDUNG")
G.04
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
CATATAN UMUM
1 2 3 4 5 6
A
B
C
1.90
7.00
2.00
Gudang Kelas 1 Kelas 2 Kelas 3 Kelas 4
±0.00 ±0.00 ±0.00 ±0.00 ±0.00
±0.05Teras
±0.10
Teras
±0.05
A A
B
B
KM
Legenda
Kolom Eksisting
Dinding Eksisting
Pintu
Jendela
Jendela Nako
5.20 8.00 8.00 8.00 6.00
35.20
A'
Partisi KayuFolding Door
EKSISTING DENAH RUANG KELAS
Denah Ruang KelasSkala 1 : 150
1
1 : 150
A.01E
A.01E
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
U
Dinding Kayu
Dinding Tombak Layar Bata
Timber Wall
5.99
A B C
7.00 1.90
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
A'
2.00
5.20 8.00 8.00 8.00 6.00
1 2 3 4 5 6
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
Tampak BaratSkala 1 : 150
1
Tampak SelatanSkala 1 : 150
2
A.02E
A.03E
A.03E
EKSISTING TAMPAK BARAT DAN SELATAN
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
5.208.008.008.006.00
123456
Dinding Tombak Layar Bata
Dinding Kayu
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
ABC
7.001.90
A
2.00
Tampak TimurSkala 1 : 150
1
Tampak UtaraSkala 1 : 150
2
A.03E
A.04E
A.04E
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
EKSISTING TAMPAK TIMUR DAN UTARA
5.20 8.00 8.00 8.00 6.00
±0.00
+2.94
-0.55
1 2 3 4 5 6
Ikatan Angin 4/11Ikatan Angin 4/6Ikatan Angin 4/6
Ikatan Angin 5/10 Ikatan Angin 5/10 Ikatan Angin 5/10+5.48
T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
Partisi KayuFolding Door
A B C
7.00 1.90
±0.00
+2.94
-0.55
Kuda-Kuda 5/10
Gording 4/9
Rangka Plafond 4/6
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
A'
2.00
Potongan A-ASkala 1 : 150
1
Potongan B-BSkala 1 : 150
2
A.04E
A.02E
A.02E
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
EKSISTING POTONGAN
1 2 3 4 5 6
A
B
C
1.90
7.00
2.00
Gudang Kelas 1 Kelas 2 Kelas 3 Kelas 4
±0.00 ±0.00 ±0.00 ±0.00 ±0.00
±0.05Teras
±0.10
Teras
±0.05
A A
B
B
KM
Legenda
Kolom
Dinding
Pintu 90°
Jendela
Jendela Nako
5.20 8.00 8.00 8.00 6.00
35.20
A'
Partisi KayuFolding Door
Pintu 180°
Denah Ruang KelasSkala 1 : 150
1
A.01R
A.01R
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
RETROFIT DENAH RUANG KELAS
U
5.20 8.00 8.00 8.00 6.00
1 2 3 4 5 6
±0.00
+2.94
-0.55
T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
A B C
7.00 1.90
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
A'
2.00
Bongkar dinding gable bata
untuk diganti gable papan
Tampak BaratSkala 1 : 150
1
Tampak SelatanSkala 1 : 150
2
A.02R
A.02R
A.02R
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
RETROFIT TAMPAK BARAT DAN SELATAN
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
ABC
7.001.90
Bongkar dinding gable bata
untuk diganti gable papan
A'
2.00
±0.00
+2.94
-0.55
+5.48T.O Atap
T.O Balok
T.O Lantai
T.O Tanah
5.208.008.008.006.00
123456
Tampak TimurSkala 1 : 150
1
Tampak UtaraSkala 1 : 150
2
A.03R
A.02R
A.02R
1 : 150
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
RETROFIT TAMPAK TIMUR DAN UTARA
1 2 3
A
B
C
5.20 8.00
1.90
7.00
2.00
Gudang
Kelas 1
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Pintu 180°
Jendela
Jendela Nako
Kolom Baru 25/25
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (2 sisi)
Dinding Baru Pasangan 1/2 Bata
+Kawat Anyam +Plester 1:3 (1 sisi)
Perbaiki lantai yang rusak
akibat pemasangan dinding baru
sesuai kebutuhan
Bobok dinding lama dan pasang
dinding baru tebal 1 bata dengan wiremesh
Pemasangan ventilasi baru
Balok pinggang di bawah
ventilasi ukuran 25/25
Modifikasi pintu jendela
sesuai kebutuhan
Pintu 90°
K1
K2
K2
K2
K2
K3K2 K2
K2 K4
K2 K2 K4
K4
K4
K2K2
K4
K4
K4
Catatan :
1. Bongkar dinding dang kolom eksisting sesuai denah
dinding dan kolom rencana retrofitting. Pertahankan
tulangan kolom dan balok eksisting, namun tambahkan
tulangan baru jika tulangan kolom eksisting tidak
sesuai dengan detail tulangan desain
2. Lihat detail tulangan pada bagian sambungan dan
overlapping
1.30
1.30
2.18
2.18
2.18
2.18
Modifikasi jendela eksisting
untuk pemasangan dinding
baru
B
B
A A
C
C
P1
PJ1
PJ2
J8
J6
P2J7
J1
J5
K4
J2
sesuaikansesuaikan
sesuaikansesuaikan
A'
Bongkar, pasang kembali folding door
eksisting mengikuti kondisi dinding
yang di retrofit
Dinding Eksisting 12 Bata + Kawat Anyam+Plester 1:3 (1 sisi)
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (1 sisi)
Perbaikan Ramp Perbaikan Ramp
S.01R
Denah Gudang dan Kelas 1Skala 1 : 100
1S.01R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT DENAH GUDANG DAN KELAS 1
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
3 4
8.00
Kelas 2
A
B
C
1.90
7.00
2.00
8.00
Kelas 3
5
Modifikasi pintu jendela
sesuai kebutuhan
Perbaiki lantai yang rusak
akibat pemasangan pondasi dan
dinding baru sesuai kebutuhan
Modifikasi jendela eksisting
untuk pemasangan dinding
baru
Bobok dinding lama dan pasang
dinding baru tebal 1 bata
dengan wiremesh
K4
K4
K4
K4
K2 K2 K4
K4
K4
K4K2K2
K2 K2 K4
K4
K4
K4K2 K2
1.30 1.30
1.301.30
2.18
2.18
B
B
A
A
PJ2PJ1
J2J1J2J1
PJ2PJ1
sesuaikan sesuaikan
sesuaikan sesuaikan
A'
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Pintu 180°
Jendela
Jendela Nako
Kolom Baru 25/25
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (2 sisi)
Dinding Baru Pasangan 1/2 Bata
+Kawat Anyam +Plester 1:3 (1 sisi)
Catatan :
1. Bongkar dinding dan kolom eksisting
sesuai denah dinding dan kolom
rencana retrofitting. Pertahankan
tulangan kolom dan balok eksisting,
namun tambahkan tulangan baru jika
tulangan kolom eksisting tidak sesuai
dengan detail tulangan desain
2. Lihat detail tulangan pada bagian
sambungan dan overlapping
Dinding Eksisting 12 Bata+ Kawat Anyam +Plester 1:3 (1 sisi)
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (1 sisi)
S.02R
Denah Kelas 2 dan Kelas 3Skala 1 : 100
1S.02R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT DENAH KELAS 2 DAN KELAS 3
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
3 4
8.00
Kelas 2
A
B
C
1.90
7.00
2.00
8.00
Kelas 3
5
Modifikasi pintu jendela
sesuai kebutuhan
Perbaiki lantai yang rusak
akibat pemasangan pondasi dan
dinding baru sesuai kebutuhan
Modifikasi jendela eksisting
untuk pemasangan dinding
baru
Bobok dinding lama dan pasang
dinding baru tebal 1 bata
dengan wiremesh
K4
K4
K4
K4
K2 K2 K4
K4
K4
K4K2K2
K2 K2 K4
K4
K4
K4K2 K2
1.30 1.30
1.301.30
2.18
2.18
B
B
A
A
PJ2PJ1
J2J1J2J1
PJ2PJ1
sesuaikan sesuaikan
sesuaikan sesuaikan
A'
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Pintu 180°
Jendela
Jendela Nako
Kolom Baru 25/25
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (2 sisi)
Dinding Baru Pasangan 1/2 Bata
+Kawat Anyam +Plester 1:3 (1 sisi)
Catatan :
1. Bongkar dinding dan kolom eksisting
sesuai denah dinding dan kolom
rencana retrofitting. Pertahankan
tulangan kolom dan balok eksisting,
namun tambahkan tulangan baru jika
tulangan kolom eksisting tidak sesuai
dengan detail tulangan desain
2. Lihat detail tulangan pada bagian
sambungan dan overlapping
Dinding Eksisting 12 Bata+ Kawat Anyam +Plester 1:3 (1 sisi)
Dinding Baru Pasangan 1 Bata
+ Kawat Anyam +Plester 1:3 (1 sisi)
S.02R
Denah Kelas 2 dan Kelas 3Skala 1 : 100
1S.02R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT DENAH KELAS 2 DAN KELAS 3
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
1.450.15
0.05
0.700.80
45°
1.94
0.20
A A
B
B
±0.00T.O Lantai
Pot. A-A
Pot. B-B
0.05 0.650.05
0.65 0.05
0.15
0.98
1.30
±0.00T.O Lantai
A A
B
B0.15
0.05
0.75
Pot. B-B
Pot. A-A
0.05 0.88
0.15
0.05
2.83
Item Kuantitas Satuan Keterangan
J5 1 Unit Retrofit
J6 2 Unit Baru
Bagian kusen yang dihilangkan
Bagian kusen yang dihilangkan
Ventilasi - J6Skala 1 : 25
1 Jendela - J5Skala 1 : 25
2
A.04R
A.04R A.04R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 1
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
1.30
1.10
±0.00T.O Lantai
B
B
A A
A A
B
B0.15
0.05
0.70
Pot. B-B
0.15
0.05
2.10
Pot. B-B
2.10
Pot. B-B
±0.00T.O Lantai
±0.00T.O Lantai
0.50
0.20
0.150.05
0.80
0.05
0.80
0.05 0.05
0.15
Pot. A-A
0.05 0.480.05
0.48 0.05
0.15
Item Kuantitas Satuan Keterangan
P1 1 Unit Retrofit
P2 2 Unit Eksisting
J7 1 Unit Eksisting
Pot. A-A
Pot. A-A
B
B
A A
Pintu - P2Skala 1 : 25
1
Jendela - J7Skala 1 : 25
2
Pintu - P1Skala 1 : 25
2
A.05R
A.05R
A.05R
A.05R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 2
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.93 0.93 0.93
B
B
A A
0.90
Pot. A-A
0.05 0.05
Item Kuantitas Satuan Keterangan
PJ1 3 Unit Retrofit
Bagian kusen yang dihilangkan2.10
Pot. B-B
0.50
0.20
0.15
±0.00T.O Lantai
1.50
1.30
Pintu Jendela - PJ1Skala 1 : 25
1
A.06R
A.06R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 3
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.930.930.93
B
B
AA
0.90
Pot. A-A
0.050.05
Bagian kusen yang dihilangkan 2.10
Pot. B-B
0.50
0.20
0.15
±0.00T.O Lantai
1.50
1.30Item Kuantitas Satuan Keterangan
PJ2 3 Unit Jendela retrofit dan daun pintu baru
Pintu Jendela - PJ2Skala 1 : 25
1
A.07R
A.07R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 4
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.93
2.10
Pot. B-B
0.50
0.20
0.15
0.93
1.50
B
B
±0.00T.O Lantai
1.30
AA
Item Kuantitas Satuan Keterangan
PJ3 1 Unit Retrofit
0.90
Pot. A-A
0.05 0.05
Bagian kusen yang dihilangkan
Pintu Jendela - PJ3Skala 1 : 25
1
A.08R
A.08R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 5
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.93
2.10
Pot. B-B
0.50
0.20
0.15
0.93
1.50
B
B
±0.00T.O Lantai
1.30
A A
0.90
Pot. A-A
0.050.05
Item Kuantitas Satuan Keterangan
PJ2 3 Unit Jendela retrofit dan daun pintu baru
Bagian kusen yang dihilangkan
Pintu Jendela - PJ4Skala 1 : 25
1
A.09R
A.09R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 6
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.98 0.88 0.98
1.30
0.93
±0.00T.O Lantai
AA
B
B
3.75
Pot. A-A
0.93 0.93 0.93 0.93
1.401.50
0.05
0.15
Pot. B-B
Item Kuantitas Satuan Keterangan
J2 3 Unit Retrofit
Bagian kusen yang dihilangkan
Jendela - J2Skala 1 : 25
1
A.10R
A.10R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 7
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.98 0.88
1.30
0.93
±0.00T.O Lantai
AA
B
B
2.83
Pot. A-A
0.93 0.93 0.93
1.401.50
0.05
0.15
Pot. B-B
Item Kuantitas Satuan Keterangan
J4 3 Unit Retrofit
Bagian kusen yang dihilangkan
0.88
1.401.50
0.05
0.15
Pot. B-B
Pot. A-A
0.93
1.30
±0.00T.O Lantai
J8 1 Unit Retrofit
Jendela - J2Skala 1 : 25
1
A.11R
A.11R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 8
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
Jendela - J8Skala 1 : 25
1A.11R
0.98 0.88 0.98
1.30
0.93
±0.00T.O Lantai
AA
B
B
3.75
Pot. A-A
0.93 0.93 0.93 0.93
1.401.50
0.05
0.15
Pot. B-B
Item Kuantitas Satuan Keterangan
J1 3 Unit Retrofit
Bagian kusen yang dihilangkan
Jendela - J1Skala 1 : 25
1
A.12R
A.12R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 9
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
0.98 0.88
1.30
0.93
±0.00T.O Lantai
AA
B
B
2.83
Pot. A-A
0.93 0.93 0.93
1.401.50
0.05
0.15
Pot. B-B
Item Kuantitas Satuan Keterangan
J3 3 Unit Retrofit
Bagian kusen yang dihilangkan
Jendela - J3Skala 1 : 25
1
A.13R
A.13R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT PINTU DAN JENDELA 10
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 25
1 2 3
A
B
C
5.20 8.00
1.90
7.00
2.00
GudangKelas 1
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Kolom Baru 25/25
K2
K2
K2
K2
K3K2 K2
K2
K4 K2 K2
K4
K4
K4
K2K2
K4
K4
K4
1.30
1.30
2.18
2.18
2.18
2.18
K4
sesuaikansesuaikan
sesuaikansesuaikan
A'
0.18
0.08
Plester dan aci
dinding pondasiPlester dan aci
dinding pondasi
Plester dan aci
dinding pondasi
Sloof 25/25
Pondasi batu kali
tambahan/ baru
Pondasi batu kali
lama/ eksisting
Bagian pondasi batu kali
yang di plaster
S.04R
Rencana PondasiSkala 1 : 100
1S.04R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT RENCANA PONDASIGUDANG DAN KELAS 1
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
3 4
8.00
Kelas 2
A
B
C
1.90
7.00
2.00
8.00
Kelas 3
5
K4
K4
K4
1.30
A'
K2 K2sesuaikan
K4
1.30
K2 K2sesuaikan
K4
K4
K4
1.30K2 K2
sesuaikan
K4
1.30
K2 K2sesuaikan
K4
K4
K4
2.18
2.18
K4
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Kolom Baru 25/25
Sloof 25/25
Pondasi batu kali
tambahan/ baru
Pondasi batu kali
lama/ eksisting
S.05R
Skala 1 : 100
1S.05R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
RETROFIT RENCANA PONDASIKELAS 2 DAN KELAS 3
Rencana Pondasi
5 6
6.00
Kelas 4
A
B
C
1.90
7.00
2.00
K2
K2
K2
K2
A'
K4
K4
K4
2.18
K4
K2 K2sesuaikan2.18
K2 K2sesuaikan
2.18
2.18
Legenda
Kolom Eksisting
Dinding Eksisting 12 Bata
Kolom Baru 25/25
Sloof 25/25
Pondasi batu kali
tambahan/ baru
Pondasi batu kali
lama/ eksisting
S.06R
Rencana PondasiSkala 1 : 100
1S.06R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang
RETROFIT DENAH KELAS 4
Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
1 2 3
A
B
C
5.20 8.00
1.90
7.00
2.00
Gudang Kelas 1
KM
Legenda
Ring Balok Eksisting
Ring Balok Baru 25/20
BC
BC
A A
Detail S.32RDetail S.33R
Detail S.34R
A'
Detail S.24R Detail S.25R Detail S.28R Detail S.26R
Detail S.27R
Detail S.29R
Bongkar Ring Balok dan
Pasangan Bata Eksisting
S.07R
Denah Gudang dan Kelas 1Skala 1 : 100
1
RETROFIT RENCANA RING BALOK/ BRACINGGUDANG DAN KELAS 1
S.07R
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
3 4
8.00
Kelas 2
A
B
C
1.90
7.00
2.00
8.00
Kelas 3
5
Legenda
Ring Balok Eksisting
Ring Balok Baru 25/20
B
B
A A
Bongkar Ring Balok dan
Pasangan Bata Eksisting
A
Detail S.26R Detail S.26R Detail S.26R
Detail S.27R
Denah Kelas 2 dan Kelas 3Skala 1 : 100
1
S.08R
S.08R
RETROFIT RENCANA RING BALOK/ BRACINGKELAS 2 DAN KELAS 3
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
5 6
6.00
Kelas 4
A
1.90
2.00
B
C
7.00
Legenda
Ring Balok Eksisting
Ring Balok Baru 25/20
B
B
A A
Detail S.26R
Detail S.29R
Denah Kelas 4Skala 1 : 100
1
S.09R
S.09R
RETROFIT RENCANA RING BALOK/ BRACINGKELAS 4
Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
1 2 3
A
B
C
5.20 8.00
1.90
7.00
2.00
Gudang Kelas 1
KM
Legenda
Ring Balok Eksisting
Ring Balok Baru 25/20
1' 2' 2''
Catatan :
1. Pada Kolom 1,1',2,2',2'',3, topang rangka atap eksisting
3.60 1.60 2.50 3.50
Kuda-Kuda 5/10
Gording 4/9
2.00
CB
C B
A A
Atap seng BJLS 0,3 mm uk. 0,8x2,4 m
A'
Denah Atap Gudang dan Kelas 1Skala 1 : 100
1
S.10R
S.10R
RETROFIT ATAP GUDANG DAN KELAS 1 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
3 4
8.00
Kelas 2
A
B
C
1.90
7.00
2.00
3'
8.00
Kelas 3
5
LegendaLegend
Ring Balok Eksisting
Ring Balok Baru 25/20
4'
Catatan :
1. Pada Kolom 4,4',5, topang rangka
atap eksisting
4.00 4.00 3.84 4.17
Kuda-Kuda 5/10
Gording 4/9
B B
BB
A A
Atap seng BJLS 0,3 mm uk. 0,8x2,4 m
A
Denah Atap Kelas 2 dan Kelas 3Skala 1 : 100
1
S.11R
S.11R
RETROFIT ATAP KELAS 2 DAN KELAS 3 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
5'5 6
6.00
Kelas 4
A
1.90
2.00
B
C
7.00
LegendLegenda
Ring Balok Eksisting
Ring Balok Baru 25/20
Catatan :
1. Pada Kolom 5,5',6, topang rangka atap eksisting
B
B
A A
Kuda-Kuda 5/10
Gording 4/9
2.54 3.47
Note :
1. At coulumn num 1,1',2,2',2'',3, Support the existing
truss frame
Atap seng BJLS 0,3 mm uk. 0,8x2,4 m
A'
Denah Atap Kelas 4Skala 1 : 100
1
S.12R
S.12R
RETROFIT ATAP KELAS 4 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 100
±0.00
+2.94
-0.55
1 2
+5.485.20
1
K2 K2K4
K3K3K2
Ring Balok Baru 25/25Ring Balok Eksisting 15/20
Bongkar dinding bata,
ganti dengan tripleks
Bongkar dinding bata lama, diganti
dengan dinding bata baru pasangan 12 bataPasang wiremesh + plester pada bagian
interior
Dinding bata eksisting
Bobok plesteran
bagian interior dan
pasang kawat anyam +
plester
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Bongkar dan modifikasi kusen dan
jendela lama sesuai kebutuhan
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir 4D13
Begel Besi PolosØ8-10 cm
Detail S.29R
Detail S.28R
Detail S.26R
sesuaikan
Tampak Barat GudangSkala 1 : 50
1
1 : 50
S.13R
S.13R
RETROFIT TAMPAK BARAT GUDANG Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
2 3
±0.00
+2.94
-0.55
+5.488.00
sesuaikan
K2 K2 K4K4
Bongkar dan modifikasi kusen dan
jendela lama sesuai kebutuhan
Ring Balok Baru 25/25Ring Balok Eksisting 15/20
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir D13
Begel Besi Polos
Ø8-10 cm
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Dinding bata eksisting
Bobok plesteran
bagian interior dan
pasang kawat anyam +
plester
Detail S.26R
Detail S.28R
Detail S.26R
1 : 50
Tampak Barat Kelas 1Skala 1 : 50
1
S.14R
S.14R
1 : 50
RETROFIT TAMPAK BARAT KELAS 1 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
3 4
±0.00
+2.94
-0.55
+5.488.00
K2 K2 K4K4
Ring Balok Baru 25/25Ring Balok Eksisting 15/20
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir D13
Begel Besi PolosØ8-10 cm
Bongkar dan modifikasi kusen dan
jendela lama sesuai kebutuhan
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Dinding bata eksisting
Bobok plesteran
bagian interior dan
pasang kawat anyam +
plester
Detail S.26R
Detail S.28R
Detail S.26R
sesuaikan
Tampak Barat Kelas 2Skala 1 : 50
1
S.15R
S.15R
1 : 501 : 50
RETROFIT TAMPAK BARAT KELAS 2 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
4 5
±0.00
+2.94
-0.55
+5.488.00
K2 K2 K4K4
Ring Balok Baru 25/25Ring Balok Eksisting 15/20
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir D13
Begel Besi PolosØ8-10 cm
Bongkar dan modifikasi kusen dan
jendela lama sesuai kebutuhan
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Dinding bata eksisting
Bobok plesteran
bagian interior dan
pasang kawat anyam +
plester
Detail S.26R
Detail S.28R
Detail S.26R
sesuaikan
Tampak Barat Kelas 3Skala 1 : 50
1
S.16R
S.16R
1 : 501 : 50
RETROFIT TAMPAK BARAT KELAS 3 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
5 6
±0.00
+2.94
-0.55
+5.486.00
Ring Balok Baru 25/25Ring Balok Eksisting 15/20
K2K4K2
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir Ø13
Begel Besi Polos
Ø8-10 cm
Bongkar dan modifikasi kusen dan
jendela lama sesuai kebutuhan
Dinding bata eksisting
Bobok plesteran bagian interior dan
pasang kawat anyam + plester
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Detail S.29R
Detail S.28R
Detail S.26R
Tampak Barat Kelas 4Skala 1 : 50
1
S.17R
S.17R
1 : 501 : 50
RETROFIT TAMPAK BARAT KELAS 4 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A B C
7.00 1.90
±0.00
+2.94
-0.55
+5.48
K2K2 K2 K2
Balok pinggang di bawah
ventilasi ukuran 20/20
Ring Balok Eksisting 15/20
K1
Bongkar dinding bagian atas
ganti dengan ventilasi
2.10
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Tulangan Utama
Besi Ulir D13
Begel Besi PolosØ8-10 cm
Bongkar dinding bata lama, pasang
dinding bata baru pasangan 1 bata
+ kawat anyam 1 sisi bagian dalam
Dinding bata eksisting
Bobok plesteran
bagian interior dan
pasang kawat anyam +
plester
Detail S.29RDetail S.29R Detail S.28R
Tampak SelatanSkala 1 : 50
1
S.18R
S.18R
1 : 501 : 50
RETROFIT TAMPAK SELATAN Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A B C
7.00 1.90
±0.00
+2.94
-0.55
Kuda-Kuda 5/10
Gording 4/9
Rangka Plafond 4/6
+5.48
Detail A
Detail B
Detail C
Detail D
T.O Atap
T.O Ring Balok
T.O Lantai
T.O Tanah
Kuda-kuda tambahan 5/10
Kayu 46 untuk vertikal supportrangka plafond ke kuda-kuda
dan gording setiap jarak
maksimal 1,2 m
Detail E
Dinding baruDinding baru
Atap seng gelombang 0,25 mm
Rangka AtapSkala 1 : 50
1
S.19R
S.19R
1 : 50
RETROFIT TAMPAK RANGKA ATAP Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.29
0.30
0.27
0.18
0.39
0.21
0.42
0.50
Plywood tebal 12 mm
Pasang dua sisi
Paku 7 cm
3 bh/ sisi
Tambahan Kayu Kuda-kuda 5/10
Tambahan Kayu Kuda-kuda 5/10
Plywood tebal 12 mm
Pasang dua sisi
Plywood tebal 12 mm
Pasang dua sisi
Paku 7 cm
7 bh/ sisi
Paku 7 cm
7 bh/ sisi
Paku 7 cm
7 bh/ sisi
Paku 7 cm
4 bh/ sisi
Paku 7 cm
3 bh/ sisi
Paku 7 cm
6 bh/ sisi
Detail ASkala 1 : 10
1
Detail ESkala 1 : 10
3
Detail BSkala 1 : 10
2
1 : 10
S.20R
S.20R
S.20R
S.20R
RETROFIT DETAIL RANGKA ATAP 1 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.50
0.35
Plywood tebal 12 mm
Pasang dua sisi
Metal strip 2 mm
Rangka plafond kayu 4/6
Rangka plafond kayu 4/6Ring Balok 25/ 20
Paku 7 cm
4 bh/ sisiPaku 7 cm
5 bh/ sisi
Paku 7 cm
6 bh/ sisi
Detail CSkala 1 : 10
1 Detail DSkala 1 : 10
2
S.21R
S.18RS.18R
1 : 10
RETROFIT DETAIL RANGKA ATAP 2 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
Jenis Kolom/ Balok
dan Mutu
Tumpuan Lapangan
Kolom 1
(K1)K-225U-32
Kolom 2
(K2)K-225U-32
Kolom 3
(K3)K-225U-32
Ring BalokK-225U-32
SloofK-225U-32
0.13
0.13
0.13
0.13
0.25
0.25
0.25
0.25
0.10
0.15
0.10
0.15
0.20
0.25
0.20
0.25
0.25
0.25
0.25
0.25
Kolom 4
(K4)K-225U-32
0.25
0.25
0.25
0.25
Besi polos 4Ø8Begel Ø6-10cm
Besi polos 4Ø8Begel Ø6-10cm
Begel
Ø8-10cmBesi Ulir4D13
Begel
Ø8-10cmBesi Ulir4D13
BegelØ8-10cmBesi Ulir3D13
BegelØ8-10cmBesi Ulir3D13
BegelØ8-10cmBesi Ulir6D13
BegelØ8-10cmBesi Ulir6D13
BegelØ8-10cm
Besi Ulir 6D13
BegelØ8-10cmBesi Ulir6D13
Begel
Ø8-10cmBesi Ulir4D13
Begel
Ø8-10cmBesi Ulir4D13
Besi polos
balok
eksisting
Detail Kolom dan BalokSkala 1 : 20
1
S.22R
S.22R
1 : 20
RETROFIT DETAIL RANGKA ATAP 2 Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A
A
2.18
0.05
Detail E
0.16
0.140.28
0.25
0.25
0.25
Ikatan kawat anyam pada jarak 5 cm
dari garis terluar kolom
Overlap kawat anyam 20 cm
0.40
K4
K4K2
K2sesuaikan
0.05 0.30 0.40
Detail E0.25
Jarak ikatan antara kawat anyam
Paku payung
untuk ikatan kawat anyam
Bobok plesteran dinding bata lama
pasang kawat anyam dan plester 1:3
pada 1 sisi bagian interior
Dinding bata baru pasangan 1 bata
spesi dan plesteran adukan 1 : 3
Kawat anyam
dimeter 1 mm
spasi 2,5 cm
Dinding bata baru
pasangan 1 bata
0.40
0.40
0.28
0.05
2
Dinding bata lama
bobok plesteran dan pasang
kawat anyam pada 2 sisi
bagian interior
0.03
0.21
0.02
0.24
Beton tahu ukuran 1 x 2 x 2 cm
untuk menjaga jarak kawat anyam
dengan bata 1 cm
Paku payung di tanam
pada bagian mortar
dinding bata untuk
menjepit beton tahu
Pemasangan kawat anyam 2-sisiSkala 1 : 20
1
Pemasangan kawat anyam 1-sisiSkala 1 : 20
2
Detail ESkala 1 : 5
3
S.23R
S.23R
S.23R
S.23R
1 : 5
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
1 : 20 ,
0.10 0.10 0.10 0.10 0.15 0.15
0.50
0.500.50
0.50
0.10
0.10
0.10
0.15
0.15
0.10
0.15
1
B
1
B
0.50
0.500.50
0.50
0.25
0.25
Kolom K2
Ring Balok 25/20
Besi ulir 4D13
Sengkang Ø8Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Jarak minimum overlap besi 50 cm
Kolom K2
Ring balok eksisting 15/15
Jarak minimum overlap besi 50 cm
0.25
0.25
45°
0.06
Detail Sambungan ASkala 1 : 10
1Detail K2Skala 1 : 10
2
S.24R
S.24RS.24R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.10
0.10
0.10
0.15
0.15
0.10
0.15
2
B
2
B
0.50
0.25
Kolom K4
Ring Balok 25/20
Besi ulir 4D13
Sengkang Ø8Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Kolom K4
Jarak minimum overlap besi 50 cm
0.25
Overlap besi ring balok masuk
ke dalam kolom minimum sepanjang 50 cm
Ring balok eksisting 15/15
Ring balok eksisting 15/15Ring balok eksisting 15/15
0.25
0.50
0.50
45°
0.06
Detail Sambungan BSkala 1 : 10
1 Detail K4Skala 1 : 10
2
S.25R
S.25RS.25R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.10
0.10
0.10
0.15
0.15
0.10
3
B
3
B
0.50
0.25
Kolom K4
Ring Balok 25/20
Besi ulir 4D13
Sengkang Ø8Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Kolom K4
Jarak minimum overlap besi 50 cm
0.25
Overlap besi ring balok masuk
ke dalam kolom minimum sepanjang 50 cm
Ring balok eksisting 15/15Ring balok eksisting 15/15
0.25
0.50
0.50
45°
0.06
Detail Sambungan CSkala 1 : 10
1 Detail K4Skala 1 : 10
2
S.26R
S.26RS.26R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.10
0.10
0.10
0.15
0.15
0.10
0.15
2
2
B
0.50
0.25
Kolom K4
Ring Balok 25/20
Besi ulir 4D13
Sengkang Ø8Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Kolom K4
Jarak minimum overlap besi 50 cm
0.25
Overlap besi ring balok masuk
ke dalam kolom minimum sepanjang 50 cm
Ring balok eksisting 15/15
0.25
0.50
0.50
45°
0.06
Detail Sambungan DSkala 1 : 10
1Detail K4Skala 1 : 10
2
S.27R
S.27RS.27R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.10 0.10 0.10 0.15 0.150.10
B
0.25
Ring Balok 25/20
Besi ulir 4D13 Sengkang Ø8 Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Kolom K2
Overlap besi ring balok masuk
ke dalam kolom minimum sepanjang 50 cm
Ring balok eksisting 15/15
0.50
Kolom K4
Jarak minimum overlap besi 50 cm
0.25
0.25
0.50
B
0.06 45°
Detail Sambungan ESkala 1 : 10
1
Detail K2Skala 1 : 10
2
S.28R
S.28R
S.28R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.10
0.10
0.10
0.15
0.15
0.10
1
A
1
3
0.25
Ring Balok 25/20
Besi ulir 4D13
Sengkang Ø8Garis putus-putus merupakan
besi eksisting yang masih
digunakan
Kolom K2Overlap besi ring balok masuk
ke dalam kolom minimum sepanjang 50 cm
Ring balok eksisting 15/15
0.50
0.25
0.25
0.50
Kolom K2
Jarak minimum overlap besi 50 cm
45°
0.06
0.06 45°
Detail Sambungan FSkala 1 : 10
1 Detail K2Skala 1 : 10
2
S.29R
S.29RS.29R
1 : 10
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A A
0.54
Panjang overlapping kawat
anyam pada bagian ring balok
dan dinding sepanjang 0,2 m
Ring balok baru0.21
0.18
0.05Panjang overlapping kawat
anyam pada bagian ring balok
dan dinding sepanjang 0,2 m
Selimutkan kawat anyam pada
tulangan ring balok. ikatkan
kawat anyam pada tulangan
longitudinal menggunakan
kawat setiap jarak 1 spasi sengkang
Ikat kawat anyam pada beton
tahu dengan jarak 6 pasangan
bata (± 39 cm arah vertikal)
Pastikan paku payung berada
pada mortar, bukan pada batu bata
Bongkar lantai keramik
dan pasang kembali, bongkar
tanah dan timbun kembali0.20
0.30
0.10
0.70
0.07
0.03
Pondasi eksisting
Tambahan pondasi batu kali
pondasi lama di bobok
sedikit untuk menambah
pondasi baru
Lantai kerja
Pasir urug
Bongkar lantai keramik
dan pasang kembali, bongkar
tanah dan timbun kembali
0.31
0.22
0.15 0.03
Tie the wiremesh to concrete
spacer each 6 bricklayer
(± 39 cm vertical direction)
Make sure that the umbrella nail
planted to the mortar, not the brick
±0.00T.O Lantai
-0.50
T.O Tanah
1 : 15
Pemasangan Wiremesh dan Pondasi TambahanSkala 1 : 15
1
S.30R
S.30R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
0.39
0.390.05 Detail
Ikat kawat anyam pada beton
tahu dengan jarak 6 pasangan
bata (± 39 cm arah vertikal)
Paku payung di tanam pada
mortar (spasi) dinding bata
untuk mengikat kawat anyam
Beton tahu ukuran 1 x 2 x 2 cm
untuk menjaga jarak kawat anyam
dengan bata 1 cm
0.01
Umbrella nail planted to the mortar
to be tied with wiremesh
Concrete spacer 1 x 2 x 2 cm
to keep the distance between
wiremesh and bricklayer
1 : 15, 1 : 5
Pemasangan WiremeshSkala 1 : 15
1
Detail Pemasangan WiremeshSkala 1 : 5
2
S.31R
S.31R
S.31R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A A
B
B
Ring Balok Baru 25/20
Angkur 12 mm, panjang 120 mm
@200 mm
0.20
0.20
0.20
0.08
Baut #10 @150 mm
2 x 18 Baut #10 @50 mm
0.05
Plat baja hitam tebal 2mm
14 Baut #10 (28 total atas dan bawah)
12 Baut #10 (24 total atas dan bawah)
CNP tebal 6mm, 80 x 45mm
Kuda-kuda 5/10
12 Baut #10 (24 total atas dan bawah)2 x 14 Baut #10 @50 mm
Angkur 12 mm, panjang
120 mm @200 mm
Ring Balok Baru 25/20
Plat baja hitam tebal 2mm Baja Ringan C.75.100,
tebal 1 mm- Tasso
Plat galvanil tebal 1mmC
C
2 x 14 Baut #10 @50 mm (total 28
buah atas dan bawahRing Balok Baru 20/25
Angkur 12 mm, panjang
120 mm @200 mm
Kolom K4
Kolom K4
0.150.050.06 0.05
0.84
0.53
0.06
30°
0.05
0.05
0.04
0.05
0.05
0.050.04
0.04
0.07
0.08
1 : 15, 1 : 5
Potongan C-CSkala 1 : 5
4
Potongan B-BSkala 1 : 15
2
Potongan A-ASkala 1 : 15
3
Detail BracingSkala 1 : 15
1
S.32R
S.32R
S.32R
S.32R
S.32R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
Plat galvanil tebal 1mmBaja Ringan C.75.100,
tebal 1 mm- Tasso
A A
B
B
Plat galvanil tebal 1mm
Kuda-kuda 5/10
Baja Ringan C.75.100,
tebal 1 mm- Tasso
1 : 15
Potongan A-ASkala 1 : 15
2
Potongan B-BSkala 1 : 15
3
Detail BracingSkala 1 : 15
1
S.33R
S.33R
S.33R
S.33R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A A
B
B
Ring Balok Baru 25/20
Angkur 12 mm, panjang 120 mm
@200 mm
Baut #10 @50 mm
2 x 14 Baut #10 @50 mm
Plat baja hitam tebal 2mm
14 Baut #10 (28 total atas dan bawah)
14 Baut #10 (28 total
atas dan bawah)
CNP tebal 6mm, 80 x 45mm
0.08 0.20 0.20 0.20
Ring Balok Baru 20/25
Angkur 12 mm, panjang
120 mm @200 mm
Kuda-kuda 5/10
12 Baut #10 (24 total atas dan bawah)2 x 14 Baut #10 @50 mm
Angkur 12 mm, panjang
120 mm @200 mm
Ring Balok Baru 20/25
Plat baja hitam tebal 2mm Baja Ringan C.75.100,
tebal 1 mm- Tasso
Plat galvanil tebal 1mm
C
C
Kolom K2
0.060.05
0.05
2 x 14 Baut #10 @50 mm (total 28
buah atas dan bawah
0.050.06
0.05
0.10
0.05
0.05
1.25
0.60
30°
Detail BracingSkala 1 : 15
1
Potongan A-ASkala 1 : 15
2
Potongan B-BSkala 1 : 15
3
S.34R
S.34R
S.34R
S.34R
1 : 15
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev :
Skala :
Digambar : Wisnu Pranata
A
Sambungan tulangan kolom
baru sepanjang ± 50 cm kepondasi eksisting
0.15
0.550.50
Pastikan tulangan kolom
berada diantara tulangan
sloof
0.15
0.550.50
0.07
0.03
0.07
0.03
0.25
Bobok dinding bata
eksisting sesuai kebutuhan
untuk bekisting dan toothing
Bobok pondasi
sedalam ± 50 cm
sesuaikan
0.25
Tulangan Utama
Besi Ulir D13
Begel Besi Polos
Ø13-10cm
Tulangan Utama
Besi Ulir D13
Begel Besi Polos
Ø13-10cm
0.05
Tebal selimut beton minimal5 cm
Bobok dinding bata baru
pasangan 1 bata
±0.00T.O Lantai
-0.50
T.O Tanah
±0.00T.O Lantai
-0.50
T.O Tanah
1 : 15
Tulangan Kolom PondasiSkala 1 : 15
1
S.35R
S.35R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, Padang Tanggal :
Rev : Digambar : Wisnu Pranata
A B C
+2.94
Rangka Plafond 4/6
+5.48
Atap seng gelombang 0,25 mmRangka gable kayu 5/10
Papan gable kayu 3/25
Rangka gable kayu 5/10
7.00
Angkur 12 mm, L 200
mm, setiap jarak 1,2 mRing balok baru
Paku panjang 6 cm
setiap jarak 15 cm
Gording eksisting
Kuda-Kuda eksisting 5/10
Kayu ikatan rangka gable 510
dengan kuda-kuda eksisting
Balok rangka gable 8/18
Angkur 12 mm, L 200
mm, setiap jarak 1,2 m
Papan gable kayu 3/25
Balok rangka gable 5/10
Balok rangka gable 5/10
Gording eksisting
Atap seng gelombang tebal 0,2 mm
T.O Atap
T.O Ring Balok
Paku 6 cm
Paku 6 cm
1 : 50
Dinding Papan GableSkala 1 : 50
1
Potongan A-ASkala 1 : 50
2
S.36R
S.36R
S.36R
RETROFIT DETAIL Halaman
Retrofitting SDN 42, Gedung "D"
Kecamatan Korong Gadang, PadangRev : Digambar : Wisnu Pranata