JOBMIX FORMULA TRIAL MIXADHIMIX PLANT PULOGADUNG

Nama Proyek : Sudirman Place

Kontraktor : PT. PP

Mutu : Fc'30 Mpa Keterangan :

Slump on Site : 12 ± 2 cm A = Proporsi Kondisi Material Setelah di Adjusment

Kode JF. Teoritis : TR/API/02/II/2004 B = Proporsi Kondisi Material SSD

Batch Volume : 1.0 m3 Kadar Air Material Penyerapan

Trial Mix Ke : 1 Splite-1 : 2.72% 1.51%

Pasir-1 : 7.97% 1.07%

Komposisi Mateial

1 m3 Setting Dial Komulatif TOLERANSI A TOLERANSI B

A B A B (-) (+) (-) (+)

Semen : 357 357 kg/m3 I Pc 357 357 ±1 % 353 361 353 361

(Indocement-Type I)

Fly Ash : 63 63 kg/m3 I Fly Ash 420 420 ±1 % 416 424.2 416 424

(Tunas Wargi Jaya)

Split 10-25 : 1067 1054 kg/m3 II Air 509 568 ±1 % 504 514 563 574

(Ex Rumpin)

Split 05-10 : 0 0 kg/m3 I

(Ex Rumpin)

Pasir : 718 671 kg/m3 II Pasir 718 671 ±1 % 711 725 665 678

(Ex Bangka)

Add-Pozzolith 100R: 1.25 1.25 kg/m3 III Split 1786 1726 ±1 % 1768 1804 ### 1743

PT. MBT-Type D

Air : 109 168 lt/m3 Add Pozzolith 100Ri 1.25 1.25 ±3 % 1.21 1.29 1.21 1.29

ES : 25 25 kg/m3 ES 25 25 ±1 % 24.3 25.8 24.3 25.8

Tanggal Dipergunakan Paraf

20 Februari 2004

Jakarta, 20 Februari 2004

Operator Laboratorium Teknik

Marseno Moch. Chusnul Effendi

Pihak Proyek

PT. Pasific Property Center PT. Pembangunan Perumahan

Daris Djonet. THJl. Iskandarsyah Raya No.33 Kebayoran Baru, Jakarta 12160 Telp. (021) 7210066, Fax (021) 7268669, E-mail : [email protected]

Page 2: Jobmix Formula Trial Mix Adhimix

JOBMIX FORMULA TRIAL MIXADHIMIX PLANT PULOGADUNG

Nama Proyek : Sudirman Place

Kontraktor : PT. PP

Mutu : Fc'30 Mpa Keterangan :

Slump on Site : 12 ± 2 cm A = Proporsi Kondisi Material Setelah di Adjusment

Kode JF. Teoritis : TR/API/02/II/2004 B = Proporsi Kondisi Material SSD

Batch Volume : 1.0 m3 Kadar Air Material Penyerapan

Trial Mix Ke : 2 Splite-1 : 2.72% 1.51%

Pasir-1 : 7.97% 1.07%

Komposisi Mateial

1 m3 Setting Dial Komulatif TOLERANSI A TOLERANSI B

A B A B (-) (+) (-) (+)

Semen : 357 357 kg/m3 I Pc 357 357 ±1 % 353 361 353 361

(Indocement-Type I)

Fly Ash : 63 63 kg/m3 I Fly Ash 420 420 ±1 % 416 424.2 416 424

(Tunas Wargi Jaya)

Split 10-25 : 1067 1054 kg/m3 II Air 534 593 ±1 % 529 539 587 599

(Ex Rumpin)

Split 05-10 : 0 0 kg/m3 I

(Ex Rumpin)

Pasir : 718 671 kg/m3 II Pasir 718 671 ±1 % 711 725 665 678

(Ex Bangka)

Add-Pozzolith 100Ri : 1.25 1.25 kg/m3 III Split 1786 1726 ±1 % 1768 1804 1709 1743

PT. MBT-Type D

Air : 134 193 lt/m3 Add Pozzolith 100Ri 1.25 1.25 ±3 % 1.21 1.29 1.21 1.29

Tanggal Dipergunakan Paraf

20 Februari 2004

Jakarta, 20 Februari 2004

Operator Laboratorium Teknik

Marseno Moch. Chusnul Effendi

Pihak Proyek

PT. Pasific Property Center PT. Pembangunan Perumahan

Daris SartonoJl. Iskandarsyah Raya No.33 Kebayoran Baru, Jakarta 12160 Telp. (021) 7210066, Fax (021) 7268669, E-mail : [email protected]

Page 3: Jobmix Formula Trial Mix Adhimix

JOBMIX FORMULA TRIAL MIXADHIMIX PLANT PULOGADUNG

Nama Proyek : Sudirman Place

Kontraktor : PT. PP

Mutu : Fc'35 Mpa Keterangan :

Slump on Site : 12 ± 2 cm A = Proporsi Kondisi Material Setelah di Adjusment

Kode JF. Teoritis : TR/API/02/II/2004 B = Proporsi Kondisi Material SSD

Batch Volume : 1.0 m3 Kadar Air Material Penyerapan

Trial Mix Ke : 3 Splite-1 : 2.72% 1.51%

Pasir-1 : 7.97% 1.07%

Komposisi Mateial

1 m3 Setting Dial Komulatif TOLERANSI A TOLERANSI B

A B A B (-) (+) (-) (+)

Semen : 442 442 kg/m3 I Pc 442 442 ±1 % 438 446 438 446

(Indocement-Type I)

Fly Ash : 0 0 kg/m3 I Fly Ash 442 442 ±1 % 438 446.4 438 446

(Tunas Wargi Jaya)

Split 10-25 : 1052 1052 kg/m3 II Air 556 616 ±1 % 551 562 610 623

(Ex Rumpin)

Split 05-10 : 0 0 kg/m3 I

(Ex Rumpin)

Pasir : 738 690 kg/m3 II Pasir 738 690 ±1 % 731 745 683 697

(Ex Bangka)

Add-Pozzolith 100R: 1.44 1.44 kg/m3 III Split 1791 1730 ±1 % 1774 1809 1713 1748

PT. MBT-Type D

Air : 134 194 lt/m3 Add Pozzolith 100Ri 1.44 1.44 ±3 % 1.39 1.48 1.39 1.48

Tanggal Dipergunakan Paraf

20 Februari 2004

Jakarta, 20 Februari 2004

Operator Laboratorium Teknik

Marseno Moch. Chusnul Effendi

Pihak Proyek

PT. Pasific Property Center PT. Pembangunan Perumahan

Daris Djonet. THJl. Iskandarsyah Raya No.33 Kebayoran Baru, Jakarta 12160 Telp. (021) 7210066, Fax (021) 7268669, E-mail : [email protected]

Page 4: Jobmix Formula Trial Mix Adhimix

JOBMIX FORMULA TRIAL MIXADHIMIX PLANT PULOGADUNG

Nama Proyek : Sudirman Place

Kontraktor : PT. PP

Mutu : Fc'45 Mpa Keterangan :

Slump on Site : 12 ± 2 cm A = Proporsi Kondisi Material Setelah di Adjusment

Kode JF. Teoritis : TR/API/02/II/2004 B = Proporsi Kondisi Material SSD

Batch Volume : 1.0 m3 Kadar Air Material Penyerapan

Trial Mix Ke : 4 Splite-1 : 2.72% 1.51%

Pasir-1 : 7.97% 1.07%

Komposisi Mateial

1 m3 Setting Dial Komulatif TOLERANSI A TOLERANSI B

A B A B (-) (+) (-) (+)

Semen : 535 535 kg/m3 I Pc 442 442 ±1 % 438 446 438 446

(Indocement-Type I)

Fly Ash : 0 0 kg/m3 I Fly Ash 442 442 ±1 % 438 446.4 438 446

(Tunas Wargi Jaya)

Split 10-25 : 1057 1045 kg/m3 II Air 556 616 ±1 % 551 562 610 623

(Ex Rumpin)

Split 05-10 : 0 0 kg/m3 I

(Ex Rumpin)

Pasir : 653 611 kg/m3 II Pasir 738 690 ±1 % 731 745 683 697

(Ex Bangka)

Add-Pozzolith 100Ri: 2.14 1.44 kg/m3 III Split 1791 1730 ±1 % 1774 1809 1713 1748

PT. MBT-Type D

Air : 138 193 lt/m3 Add Pozzoli 1.44 1.44 ±3 % 1.39 1.48 1.39 1.48

Tanggal Dipergunakan Paraf

20 Februari 2004

Jakarta, 20 Februari 2004

Operator Laboratorium Teknik

Marseno Moch. Chusnul Effendi

Pihak Proyek

PT. Pasific Property Center PT. Pembangunan Perumahan

Daris Djonet. THJl. Iskandarsyah Raya No.33 Kebayoran Baru, Jakarta 12160 Telp. (021) 7210066, Fax (021) 7268669, E-mail : [email protected]