LOCATION MAP OF JATIGEDE DAM PROJECT
Bend. Jatigede
8/15/2019 Jatigede DAM
3/51
3
3
Jatigede Dam
CIMANUK
–
CISANGGARUNG
RIVER BASIN
Rentang Weir
8/15/2019 Jatigede DAM
4/51
BENEFID OF THE PROJECT
Irrigation
Scheme Rentang= 90,000 ha
Jatigede Reservoir
RentangWeir
SI Cipelang(Kiri)= 38,612ha
SI Sindupraja(Kanan)= 51,388 ha
Irrigation : 90,000 Ha
Water Supply: 3,500 l/sec
COVERING AREA
Cirebon, IndramayuMajalengka, Sumedang
Regency
HYDRO POWER
Inst. Capacity 110 MW
Flood Control14.000 Ha
8/15/2019 Jatigede DAM
5/515
JATIGEDE DAMRESERVOIR AREA
4,402 HA
8/15/2019 Jatigede DAM
6/51
ORGANIZATION 1)
1. Employer : Minister of Public Works
2. Engineer : Cimanuk Cisanggarung River Basin Agency
3. Engineer’s Representative : SNVT Dam Construction
4. Supervision Consultant : PT. Indra Karya in association
with PT. Mettana, PT. Tata Guna Patria, and PT.
Wiratman & Ass.
5. DED Consultant : SWHI (Sichuan Water Resources and
Hydroelectric Investigation & Design Institute)
6. Contractor : Sinohydro-JO-CIC (Consortium ofIndonesian Contractor), comprise of: PT. Wijaya Karya,
PT. Waskita Karya, PT. Pembangunan Perumahan and
PT. Hutama Kar a
8/15/2019 Jatigede DAM
7/51
Head of Cimanuk-Cisanggarung River Basin
Agency
Trisasongko Widianto
Head of SNVT DamConstruction
Harya Muldianto
CommitmentOfficer for Dam
Planning
Harya
Muldianto
Staf
CommitmentOfficer for Dam I
DonyFaturochman
Staf
CommitmentOfficer for
Dam II
Lukman
Hakim
Staf
CommitmentOfficer for Dam
III
A. H. Subarda
Staf
CommitmentOfficer for
Embung, Lakeand Situ
M. Alkham
Staf
CommitmentOfficer for
LandAcquisition
EndangSuratman
Staf
Treasury
DedeRuslanEffendi
Staf
PPSPM
Dicky Mutakin
Staf
ORGANIZATION
PREV OU TUDY
8/15/2019 Jatigede DAM
8/51
8
PREVIOUS STUDY
Reconnaisance Study, 1963 - PT. Indah Karya Master Plan Study, 1967 - Coyne et Bellier (France) Pre Feasibility Study, 1973 - Nedeco (Dutch) &
SMEC (Australia) Detailed Design, 1977 - SMEC (Australia) Review Feasibility Study, 1983 - SMEC (Australia) Detailed Design, 1986 – SMEC (Australia) &
PT. Indra Karya (Persero) Consolidation Study, 1991 - SMEC (Australia) &
PT. Indra Karya (Persero) Project Implementation Preparation Review Study, 2000 by
Colenco – Binni Black – PT. Indra Karya (Persero) – PT. Indec
Optimization Study of Jatigede Dam, 2003 by PT.Indra Karya(Persero), PT.Tata Guna Patria dan PT.Barunadri
Review Detail Design, 2004 - PT.Indra Karya (Persero) andPT.Wiratman & Associates.
8/15/2019 Jatigede DAM
9/51
9
2. DETAIL DESIGN OF JATIGEDE DAM PREPARED SINCE 1986 BY SMEC-CONSULTANT, AUSTRALIA
3. LAND ACQUISITIONPERMENDAGRI NO 15/1975 == LAND ACQUISITION 1982-1986 (4.065 KK)
KEPPRES NO 55/1993 == LAND ACQUISITION 1994-1997 (1.226 KK)
PERPRES NO 36/2005 dan == LAND ACQUISITION 2005-SKRG (1.918 KK)
PERATURAN KEPALA BPN NO 3/2007
4. SIGNING OF CONTRACT, DATED APRIL 30, 2007, BETWEEN SINOHYDRO CORPORATION LIMITED JOIN
OPERATION WITH CONSORSIUM OF INDONESIAN CONTRACTORS (CIC) AND COMMITMENT OFFICER JATIGEDE
DAM PROJECT 5. IMPLEMENTATION PERIOD NOVEMBER 15, 2007 U/T SEPTEMBER 09, 2016
SATUAN KERJA NON VERTIKAL TERTENTU (SNVT) JATIGEDE DAM PROJECT ASSISTED BY NATIONAL CONSULTANT AND
FOREIGN CONSULTANT FROM PEOPLE REPUBLIC OF CHINA
6. OCTOBER 23, 2008 : FIRST BLASTING TO START CONSTRUCTION OF DIVERSION TUNNEL SET AS THE
COMMENCEMENT OF PHYSICAL ACTIVITIES OF JATIGEDE DAM PROJECT
7. AUGUST 03, 2011 : DIVERSION OF CIMANUK STREAM TO DIVERSION TUNNEL SET AS THE COMMENCEMENTOF PHYSICAL ACTIVITIES JATIGEDE MAIN DAM
8. COMPLETION PLAN OF SOCIAL IMPACT AND ENVIRONMENTAL MATTER FOR IMPOUNDING : JUNE 2013
INITIAL IMPOUNDING, AUGUST 31, 2015OPENING CEREMONY OF JATIGEDE DAM
??????
1. INITIATION OF IDEA FOR JATIGEDE DAM PROJECT , YEAR 1963
Chronology of Jatigede Dam Project
8/15/2019 Jatigede DAM
10/51
JATIGEDE DAM PROJECT PROFILE (1/2)
DAMType : Rock fill, vertical core
Dam crest elevation : El. +265
Length : 1,715 m
Width of dam crest : 12 m
Max. Dam height : 114 m
Volume of embankment : 6.7 x 10
6
m
3
HIDROLOGY
Catchment area : 1,462 km2
Annual discharge : 2.5 x 109 m3
RESERVOIRWater Elevation(WE) of max. flood : El. +262
WE Max. Operation (FSL ) : El. +260
WE Min. Operation (MOL ) : El. +230
Area (El. 262) : 41.22 km2
Total volume (gross) (El. +260) : 980 x 106 m3
Effective volume(between El.+221 Dan El +260) : 877 x 106 m3
SPILLWAY
Location : at the dam body
Type : Chute type with 4 radial gates
Width of top Weir : 52 m (4 x 13.0 m), El.+247
Dimension of radial gates : 4 bh (W=13.0 m ; H=14.5 m)
Q : 11,000 m3 /s
8/15/2019 Jatigede DAM
11/51
IRRIGATION OUTLET
Location : at the spillway body
Elevation of apron : El. +221
Type of structure : Reinforced Concrete Conduit with
Steel Liner
Dimention of conduit : b = 3.9 m; h = 4.1 m, L = 166 m
DIVERSION TUNNEL
Location : below the spillway
Elevation of Inlet : El. +164
Type : Circular, reinforced concreteDesign discharge (Q100) : 3,200 m
3 /dt
Dimention of tunnel : D = 10 m ; L = 546 m
POWER WATER WAY FOR PLTA
Location : at right side of main dam
Inlet bottom : El. +221Dimension of power water way : D = 4.5 m ; L = 3,095 m
Drop height : 170 m
Type of turbin : Francis
Capacity : 2 x 55 MW = 110 MW
Average production : 690 GWH/year
JATIGEDE DAM PROJECT PROFILE (2/2)
8/15/2019 Jatigede DAM
12/51
LOAN PROFILE 1/2)
JATIGEDE DAM PROJECT
I. ORIGINAL
1.1.
Name of Loan : Preferential Buyer Credit1.2.
No. of Loan : China Exim Bank PBC No. (14) Total No. (35)
1.3. No. of Register : 21595701
1.4 Loan Agreement Date : 25 September 2007
1.5
Loan Effectiveness Date : 20 November 20071.6
Loan Value : USD. 215,615,732.40
1.7 Loan Period : 15 years
- Grace Period : 6 years
(20 November 2007 u/t 20 November 2013)- Repayment period : 9 years
LOAN PROFILE (2/2)
8/15/2019 Jatigede DAM
13/51
LOAN PROFILE (2/2)JATIGEDE DAM PROJECT
II.
ADDITION
1.1.
Name of Loan : Preferential Buyer Credit1.2. No. of Loan : China Exim Bank PBC No. (31) Total No. (275
1.3. No. of Register : 21674001
1.4. Loan Agreement Date : 3 September 2013
1.5. Loan Effectiveness Date : 19 September 2007
1.6. Loan Value : USD. 117,000,000.00
1.7. Loan Period : 156 months (13 years)
-
Grace Period : 36 months (3 years)(19 September 2013 u/t 19 September 2016)
- Repayment period : 120 months (10 years)
8/15/2019 Jatigede DAM
14/51
IMPLEMENTATION STATUS
JATIGEDE DAM PROJECT
1. Contract Price
Original Contract Price : Rp. 869,099,084,442 + USD. 144,067,642
Additional Contract Price : Rp. 1,300,397,982,822 + USD. 84,974,114.67
Total Contract Price + GOI : Rp. 2,169,497,067,264 + USD. 229,041,756.67
Self Funding (FY 2012) : USD 467,448,O27.80
2.
Implementation Period
Original Contract : 1,950 days (15 Nov.2007 u/t 17 Mar.2013)
Time Extension I : 1,950 + 248 = 2,198 days (15 Nov. 2007 u/t 20 Nov. 2013)
Time Extension II : 2,198 + 313 = 2,513 days (15 Nov. 2007 u/t 1 Okt. 2014)
Time Extension III : 2.513 + 304 = 2,817 days (15 Nov. 2007 u/t 1 August 2015
Time Extension IV : 2,817 + 405 = 3,222 days (15 Nov. 2007 u/t 9 Sept. 2016)
8/15/2019 Jatigede DAM
15/51
15
8/15/2019 Jatigede DAM
16/51
LAYOUT OF JATIGEDE DAM PROJECT
8/15/2019 Jatigede DAM
17/51
17
JATIGEDE DAMGENERAL PLAN
DAM
DIVERSION
TUNNEL
SPILLWAY
POWERWATERWAY
IRRIGATIONOUTLET
TIPIKAL POTONGAN MELINTANG BENDUNGAN
8/15/2019 Jatigede DAM
18/51
8/15/2019 Jatigede DAM
19/51
8/15/2019 Jatigede DAM
20/51
8/15/2019 Jatigede DAM
21/51
8/15/2019 Jatigede DAM
22/51
LEFT BANK
8/15/2019 Jatigede DAM
23/51
RIGHT BANK
8/15/2019 Jatigede DAM
24/51
8/15/2019 Jatigede DAM
25/51
8/15/2019 Jatigede DAM
26/51
Spillway, Chute and Plunge Pool
8/15/2019 Jatigede DAM
27/51
Plunge Pool
8/15/2019 Jatigede DAM
28/51
8/15/2019 Jatigede DAM
29/51
8/15/2019 Jatigede DAM
30/51
PROCESS OF DIVERSION OF RIVER FLOW 3)
8/15/2019 Jatigede DAM
31/51
DIVERSION TUNNEL
8/15/2019 Jatigede DAM
32/51
32
8/15/2019 Jatigede DAM
33/51
33
LAY-OUT OF POWER WATERWAY
8/15/2019 Jatigede DAM
34/51
INTAKEPOWER
GATE CONTROLSHAFT
HEADRACETUNNEL
SURGESHAFT
POWERSTATION
SWITCH YARD
TAILRACE
TUNNEL
OUTLETWORKS
CIMANUK RIVER REGULATINGDAM
8/15/2019 Jatigede DAM
35/51
LONGITUDINAL SECTION OF THE TUNNEL AND GATE SHAFT
8/15/2019 Jatigede DAM
36/51
8/15/2019 Jatigede DAM
37/51
8/15/2019 Jatigede DAM
38/51
38
SCENARIO FOR INITIAL IMPOUNDING OF RESERVOIR
8/15/2019 Jatigede DAM
39/51
Day 68 (6 Nov 2015)
EL. +260,00 m
EL. +204,00 m
EL. +221,00 m
EL. +230,00 m
EL. +247,00 m
Axis of Main Dam
Axis of GateChamber
U/S DiversionTunnel
Day 102 (10 Des 2015)
Day 133 (10 Jan 2016)
Day 227 (13 Apr 2016)
Day 518 (29 Jan 2017) DESA JEMAH
DESACIPAKU
DESAJEMAH
DESAMEKARASI
H
DESAJATIBUNG
UR
DESACIPAKU
DESAPAKUALAM
DESAJEMAH
DESA
SUKAREKSA DESACIRANGGEM
DESAPADAJAYA
DESAMEKARASI
H
DESACISURAT
DESACIPAKU
DESAPAKUALAM
DESAJEMAH
DESA
SUKAREKSA
DESALEUWIHIDEU
NG
DESACIRANGGEM
DESAPADAJAYA
DESA
SUKAMENAK
DESAJATIBUNG
UR
DESA
MEKARASIH
DESA
CIPAKU
DESA
PAKUALAM
DESA
JEMAH
DESACIBOGO
DESA
SUKAREKSA
DESA
LEUWIHIDEUNG
DESA
CIRANGGEM
DESA
KARANGPAKUAN
DESA WADO
DESA
PADAJAYA
DESA
JATIBUNGUR
DESA
PAWENANG
DESA CISURAT
DESA
SUKARATU
DESA
SIRNASARI
DESA
SUKAMENAK
31 AGUSTUS 2015
8/15/2019 Jatigede DAM
40/51
8/15/2019 Jatigede DAM
41/51
60,3 60,3 59,9 59,0 59,0 59,0 57,8 57,0 55,9 54,3 52,9 51,1
0,00
20,00
40,00
60,00
80,00
100,00
120,00
140,00
160,00
180,00
200,00
MEI-1 MEI-2 MEI-3 JUN-1 JUN-2 JUN-3 JULI-1 JULI-2 JULI-3 AGT-1 AGT-2 AGT-3
D I S C H A R G E ( m 3 / s
e c )
PERIOD DECADE
Q-intake Jatigede 2016
Q-POLA
Q-demand (Rentang weir)
Elev +260 will be reachedin January 2017,
May – Agust 2016reservoir will release thedischarge from 51 m3/se– 60.27 m3/sec.
Fulfillment of dischargerequirement
Liability: 46 % - 100 %
8/15/2019 Jatigede DAM
42/51
SCENARIO IRRIGATIONLIABILITY
MEAN
DISCHARGEMT II(m3/s)
TARGET REMARKS
OPENE -CLOSE
IRRIGATION
GATE &SPILLWAY
46 – 100 % 57,20 m3/sec JAN. 29, 2017 OperationIrrigation IntakeApril – August
12 hour
Notes:Operation Close and Open of Irrigation Intake Gate - 12 hour for 5
months
8/15/2019 Jatigede DAM
43/51
8/15/2019 Jatigede DAM
44/51
8/15/2019 Jatigede DAM
45/51
45
ACQUIRED
SCHEME OF LAND ACQUISITION
8/15/2019 Jatigede DAM
46/51
IMPOUNDING AREA+
DAM STRUCTURE
AND FACILITIES
4,980.30 Ha
RESERVOIR
4,402.15 Ha
DAM STRUCTURE
AND AUXILIARY
FACILITIES
578.15 Ha
PUBLIC AREA
3.259 Ha
FORESTRY AREA
1,143.15 Ha
3,256.44 Ha
UN-ACQUIRED
2,56 HaTO BE EVALUATED
SUBSTITUTED
521.18 Ha
UN-SUBSTITUTED
621.97 Ha
PROGRAM FY 2013
92.81 Ha
PUBLIC AREA
332 Ha
FORESTRY AREA
246.15 Ha
ACQUIRED308.47 Ha
UN-ACQUIRED
23.53 Ha
SUBSTITUTED
246.15 Ha
DAM STRUCTURE
AND WORKING AREA
ROAD RELOCATION
23.53 Ha
Note: There are claim of un-acquired landtoward land acquisition process from1982-1986, and illegal housing matter
TO BE PROGRAMMED
529.16 Ha
8/15/2019 Jatigede DAM
47/51
PENYUSUNAN TATA KAWASAN WADUK JATIGEDE
LANDSCAPE
ZONING OF JATIGEDE DAM PROJECT AREA
8/15/2019 Jatigede DAM
48/51
8/15/2019 Jatigede DAM
49/51
49
8/15/2019 Jatigede DAM
50/51
8/15/2019 Jatigede DAM
51/51