Jatigede DAM

download Jatigede DAM

of 51

Transcript of Jatigede DAM

  • 8/15/2019 Jatigede DAM

    1/51

  • 8/15/2019 Jatigede DAM

    2/51

    LOCATION MAP OF JATIGEDE DAM PROJECT

    Bend. Jatigede

  • 8/15/2019 Jatigede DAM

    3/51

    3

    3

    Jatigede Dam

    CIMANUK

    CISANGGARUNG

    RIVER BASIN

    Rentang Weir

  • 8/15/2019 Jatigede DAM

    4/51

    BENEFID OF THE PROJECT 

    Irrigation

    Scheme Rentang= 90,000 ha

    Jatigede Reservoir

    RentangWeir

    SI Cipelang(Kiri)= 38,612ha

    SI Sindupraja(Kanan)= 51,388 ha

    Irrigation : 90,000 Ha

     Water Supply: 3,500 l/sec

    COVERING AREA

    Cirebon, IndramayuMajalengka, Sumedang

    Regency

    HYDRO POWER

    Inst. Capacity 110 MW

    Flood Control14.000 Ha

  • 8/15/2019 Jatigede DAM

    5/515

     JATIGEDE DAMRESERVOIR AREA

    4,402 HA

  • 8/15/2019 Jatigede DAM

    6/51

    ORGANIZATION 1)

    1. Employer : Minister of Public Works

    2. Engineer : Cimanuk Cisanggarung River Basin Agency

    3. Engineer’s Representative : SNVT Dam Construction

    4. Supervision Consultant : PT. Indra Karya in association

    with PT. Mettana, PT. Tata Guna Patria, and PT.

    Wiratman & Ass.

    5. DED Consultant : SWHI (Sichuan Water Resources and

    Hydroelectric Investigation & Design Institute)

    6. Contractor : Sinohydro-JO-CIC (Consortium ofIndonesian Contractor), comprise of: PT. Wijaya Karya,

    PT. Waskita Karya, PT. Pembangunan Perumahan and

    PT. Hutama Kar a

  • 8/15/2019 Jatigede DAM

    7/51

    Head of Cimanuk-Cisanggarung River Basin

    Agency

    Trisasongko Widianto

    Head of SNVT DamConstruction

    Harya Muldianto

    CommitmentOfficer for Dam

    Planning

    Harya

    Muldianto

    Staf

    CommitmentOfficer for Dam I

    DonyFaturochman

    Staf

    CommitmentOfficer for

    Dam II

    Lukman

    Hakim

    Staf

    CommitmentOfficer for Dam

    III

    A. H. Subarda

    Staf

    CommitmentOfficer for

    Embung, Lakeand Situ

    M. Alkham

    Staf

    CommitmentOfficer for

    LandAcquisition

    EndangSuratman

    Staf

    Treasury

    DedeRuslanEffendi

    Staf

    PPSPM

    Dicky Mutakin

    Staf

    ORGANIZATION

    PREV OU TUDY

  • 8/15/2019 Jatigede DAM

    8/51

    8

    PREVIOUS STUDY

    Reconnaisance Study, 1963 - PT. Indah Karya Master Plan Study, 1967 - Coyne et Bellier (France) Pre Feasibility Study, 1973 - Nedeco (Dutch) &

    SMEC (Australia) Detailed Design, 1977 - SMEC (Australia) Review Feasibility Study, 1983 - SMEC (Australia) Detailed Design, 1986 – SMEC (Australia) &

    PT. Indra Karya (Persero) Consolidation Study, 1991 - SMEC (Australia) &

    PT. Indra Karya (Persero) Project Implementation Preparation Review Study, 2000 by

    Colenco – Binni Black – PT. Indra Karya (Persero) – PT. Indec

    Optimization Study of Jatigede Dam, 2003 by PT.Indra Karya(Persero), PT.Tata Guna Patria dan PT.Barunadri

    Review Detail Design, 2004 - PT.Indra Karya (Persero) andPT.Wiratman & Associates.

  • 8/15/2019 Jatigede DAM

    9/51

    9

    2. DETAIL DESIGN OF JATIGEDE DAM PREPARED SINCE 1986 BY SMEC-CONSULTANT, AUSTRALIA

    3. LAND ACQUISITIONPERMENDAGRI NO 15/1975 == LAND ACQUISITION 1982-1986 (4.065 KK)

    KEPPRES NO 55/1993 == LAND ACQUISITION 1994-1997 (1.226 KK)

    PERPRES NO 36/2005 dan == LAND ACQUISITION 2005-SKRG (1.918 KK)

    PERATURAN KEPALA BPN NO 3/2007

    4. SIGNING OF CONTRACT, DATED APRIL 30, 2007, BETWEEN SINOHYDRO CORPORATION LIMITED JOIN 

    OPERATION WITH CONSORSIUM OF INDONESIAN CONTRACTORS (CIC) AND COMMITMENT OFFICER JATIGEDE 

    DAM PROJECT 5. IMPLEMENTATION PERIOD NOVEMBER 15, 2007 U/T SEPTEMBER 09, 2016

    SATUAN KERJA NON VERTIKAL TERTENTU (SNVT) JATIGEDE DAM PROJECT ASSISTED BY NATIONAL CONSULTANT AND

    FOREIGN CONSULTANT FROM PEOPLE REPUBLIC OF CHINA

    6.   OCTOBER 23, 2008 : FIRST BLASTING TO START CONSTRUCTION OF DIVERSION TUNNEL SET AS THE

    COMMENCEMENT OF PHYSICAL ACTIVITIES OF JATIGEDE DAM PROJECT

    7. AUGUST 03, 2011 : DIVERSION OF CIMANUK STREAM TO DIVERSION TUNNEL SET AS THE COMMENCEMENTOF PHYSICAL ACTIVITIES JATIGEDE MAIN DAM

    8. COMPLETION PLAN OF SOCIAL IMPACT AND ENVIRONMENTAL MATTER FOR IMPOUNDING : JUNE 2013

    INITIAL IMPOUNDING, AUGUST 31, 2015OPENING CEREMONY OF JATIGEDE DAM

    ??????

    1. INITIATION OF IDEA FOR JATIGEDE DAM PROJECT , YEAR 1963

    Chronology of Jatigede Dam Project

  • 8/15/2019 Jatigede DAM

    10/51

    JATIGEDE DAM PROJECT PROFILE (1/2)

    DAMType : Rock fill, vertical core

    Dam crest elevation : El. +265

    Length : 1,715 m

    Width of dam crest : 12 m

    Max. Dam height : 114 m

    Volume of embankment : 6.7 x 10

    6

    m

    3

    HIDROLOGY

    Catchment area : 1,462 km2

    Annual discharge : 2.5 x 109 m3

    RESERVOIRWater Elevation(WE) of max. flood : El. +262

    WE Max. Operation (FSL ) : El. +260

    WE Min. Operation (MOL ) : El. +230

    Area (El. 262) : 41.22 km2

    Total volume (gross) (El. +260) : 980 x 106 m3

    Effective volume(between El.+221 Dan El +260) : 877 x 106 m3

    SPILLWAY

    Location : at the dam body

    Type : Chute type with 4 radial gates

    Width of top Weir : 52 m (4 x 13.0 m), El.+247

    Dimension of radial gates : 4 bh (W=13.0 m ; H=14.5 m)

    Q : 11,000 m3 /s

  • 8/15/2019 Jatigede DAM

    11/51

    IRRIGATION OUTLET

    Location : at the spillway body

    Elevation of apron : El. +221

    Type of structure : Reinforced Concrete Conduit with

    Steel Liner 

    Dimention of conduit : b = 3.9 m; h = 4.1 m, L = 166 m

    DIVERSION TUNNEL

    Location : below the spillway

    Elevation of Inlet : El. +164

    Type : Circular, reinforced concreteDesign discharge (Q100) : 3,200 m

    3 /dt

    Dimention of tunnel : D = 10 m ; L = 546 m

    POWER WATER WAY FOR PLTA

    Location : at right side of main dam

    Inlet bottom : El. +221Dimension of power water way : D = 4.5 m ; L = 3,095 m

    Drop height : 170 m

    Type of turbin : Francis

    Capacity : 2 x 55 MW = 110 MW

    Average production : 690 GWH/year  

    JATIGEDE DAM PROJECT PROFILE (2/2)

  • 8/15/2019 Jatigede DAM

    12/51

    LOAN PROFILE 1/2)

    JATIGEDE DAM PROJECT

    I.  ORIGINAL

    1.1. 

    Name of Loan : Preferential Buyer Credit1.2.

     

    No. of Loan : China Exim Bank PBC No. (14) Total No. (35)

    1.3. No. of Register : 21595701

    1.4  Loan Agreement Date : 25 September 2007

    1.5 

    Loan Effectiveness Date : 20 November 20071.6

     

    Loan Value : USD. 215,615,732.40

    1.7  Loan Period : 15 years

    -  Grace Period : 6 years

    (20 November 2007 u/t 20 November 2013)-  Repayment period : 9 years

    LOAN PROFILE (2/2)

  • 8/15/2019 Jatigede DAM

    13/51

    LOAN PROFILE (2/2)JATIGEDE DAM PROJECT

    II. 

     ADDITION

    1.1. 

    Name of Loan : Preferential Buyer Credit1.2.  No. of Loan : China Exim Bank PBC No. (31) Total No. (275

    1.3.  No. of Register : 21674001

    1.4.  Loan Agreement Date : 3 September 2013

    1.5.  Loan Effectiveness Date : 19 September 2007

    1.6.  Loan Value : USD. 117,000,000.00

    1.7.  Loan Period : 156 months (13 years)

    Grace Period : 36 months (3 years)(19 September 2013 u/t 19 September 2016)

    -  Repayment period : 120 months (10 years)

  • 8/15/2019 Jatigede DAM

    14/51

    IMPLEMENTATION STATUS

    JATIGEDE DAM PROJECT

    1.  Contract Price

     

    Original Contract Price : Rp. 869,099,084,442 + USD. 144,067,642 

     Additional Contract Price : Rp. 1,300,397,982,822 + USD. 84,974,114.67

     

    Total Contract Price + GOI : Rp. 2,169,497,067,264 + USD. 229,041,756.67

    Self Funding (FY 2012) : USD 467,448,O27.80

    2. 

    Implementation Period

     

    Original Contract : 1,950 days (15 Nov.2007 u/t 17 Mar.2013)

     

    Time Extension I : 1,950 + 248 = 2,198 days (15 Nov. 2007 u/t 20 Nov. 2013)

     

    Time Extension II : 2,198 + 313 = 2,513 days (15 Nov. 2007 u/t 1 Okt. 2014) 

    Time Extension III : 2.513 + 304 = 2,817 days (15 Nov. 2007 u/t 1 August 2015

      Time Extension IV : 2,817 + 405 = 3,222 days (15 Nov. 2007 u/t 9 Sept. 2016)

  • 8/15/2019 Jatigede DAM

    15/51

    15

  • 8/15/2019 Jatigede DAM

    16/51

    LAYOUT OF JATIGEDE DAM PROJECT

  • 8/15/2019 Jatigede DAM

    17/51

    17

    JATIGEDE DAMGENERAL PLAN

    DAM

    DIVERSION

    TUNNEL

    SPILLWAY

    POWERWATERWAY

    IRRIGATIONOUTLET 

    TIPIKAL POTONGAN MELINTANG BENDUNGAN

  • 8/15/2019 Jatigede DAM

    18/51

  • 8/15/2019 Jatigede DAM

    19/51

  • 8/15/2019 Jatigede DAM

    20/51

  • 8/15/2019 Jatigede DAM

    21/51

  • 8/15/2019 Jatigede DAM

    22/51

    LEFT BANK

  • 8/15/2019 Jatigede DAM

    23/51

    RIGHT BANK

  • 8/15/2019 Jatigede DAM

    24/51

  • 8/15/2019 Jatigede DAM

    25/51

  • 8/15/2019 Jatigede DAM

    26/51

    Spillway, Chute and Plunge Pool

  • 8/15/2019 Jatigede DAM

    27/51

    Plunge Pool

  • 8/15/2019 Jatigede DAM

    28/51

  • 8/15/2019 Jatigede DAM

    29/51

  • 8/15/2019 Jatigede DAM

    30/51

    PROCESS OF DIVERSION OF RIVER FLOW 3)

  • 8/15/2019 Jatigede DAM

    31/51

    DIVERSION TUNNEL

  • 8/15/2019 Jatigede DAM

    32/51

    32

  • 8/15/2019 Jatigede DAM

    33/51

    33

    LAY-OUT OF POWER WATERWAY

  • 8/15/2019 Jatigede DAM

    34/51

    INTAKEPOWER

    GATE CONTROLSHAFT 

    HEADRACETUNNEL

    SURGESHAFT 

    POWERSTATION

    SWITCH YARD

    TAILRACE

    TUNNEL

    OUTLETWORKS

    CIMANUK RIVER REGULATINGDAM

  • 8/15/2019 Jatigede DAM

    35/51

    LONGITUDINAL SECTION OF THE TUNNEL AND GATE SHAFT

  • 8/15/2019 Jatigede DAM

    36/51

  • 8/15/2019 Jatigede DAM

    37/51

  • 8/15/2019 Jatigede DAM

    38/51

    38

    SCENARIO FOR INITIAL IMPOUNDING OF RESERVOIR

  • 8/15/2019 Jatigede DAM

    39/51

    Day 68 (6 Nov 2015)

    EL. +260,00 m

    EL. +204,00 m

    EL. +221,00 m

    EL. +230,00 m

    EL. +247,00 m

    Axis of Main Dam

    Axis of GateChamber

    U/S DiversionTunnel

    Day 102 (10 Des 2015)

    Day 133 (10 Jan 2016)

    Day 227 (13 Apr 2016)

    Day 518 (29 Jan 2017) DESA JEMAH

    DESACIPAKU

    DESAJEMAH

    DESAMEKARASI

    H

    DESAJATIBUNG

    UR

    DESACIPAKU

    DESAPAKUALAM

    DESAJEMAH

    DESA

    SUKAREKSA DESACIRANGGEM

    DESAPADAJAYA

    DESAMEKARASI

    H

    DESACISURAT 

    DESACIPAKU

    DESAPAKUALAM

    DESAJEMAH

    DESA

    SUKAREKSA

    DESALEUWIHIDEU

    NG

    DESACIRANGGEM

    DESAPADAJAYA

    DESA

    SUKAMENAK

    DESAJATIBUNG

    UR

    DESA

    MEKARASIH

    DESA

    CIPAKU

    DESA

    PAKUALAM

    DESA

    JEMAH

    DESACIBOGO

    DESA

    SUKAREKSA

    DESA

    LEUWIHIDEUNG

    DESA

    CIRANGGEM

    DESA

    KARANGPAKUAN

    DESA WADO

    DESA

    PADAJAYA

    DESA

    JATIBUNGUR

    DESA

    PAWENANG

    DESA CISURAT

    DESA

    SUKARATU

    DESA

    SIRNASARI

    DESA

    SUKAMENAK

    31 AGUSTUS 2015

  • 8/15/2019 Jatigede DAM

    40/51

  • 8/15/2019 Jatigede DAM

    41/51

    60,3 60,3 59,9 59,0 59,0 59,0 57,8 57,0 55,9 54,3 52,9 51,1

    0,00

    20,00

    40,00

    60,00

    80,00

    100,00

    120,00

    140,00

    160,00

    180,00

    200,00

    MEI-1 MEI-2 MEI-3 JUN-1 JUN-2 JUN-3 JULI-1 JULI-2 JULI-3 AGT-1 AGT-2 AGT-3

       D   I   S   C   H   A   R   G   E   (  m   3   /  s

      e  c   )

    PERIOD DECADE

    Q-intake Jatigede 2016

    Q-POLA

    Q-demand (Rentang weir)

    Elev +260 will be reachedin January 2017,

    May – Agust 2016reservoir will release thedischarge from 51 m3/se– 60.27 m3/sec.

    Fulfillment of dischargerequirement

    Liability: 46 % - 100 %

  • 8/15/2019 Jatigede DAM

    42/51

    SCENARIO IRRIGATIONLIABILITY

    MEAN

    DISCHARGEMT II(m3/s)

    TARGET REMARKS

    OPENE -CLOSE

    IRRIGATION

    GATE &SPILLWAY

    46 – 100 % 57,20 m3/sec JAN. 29, 2017 OperationIrrigation IntakeApril – August

    12 hour

    Notes:Operation Close and Open of Irrigation Intake Gate - 12 hour for 5

    months

  • 8/15/2019 Jatigede DAM

    43/51

  • 8/15/2019 Jatigede DAM

    44/51

  • 8/15/2019 Jatigede DAM

    45/51

    45

     ACQUIRED

    SCHEME OF LAND ACQUISITION

  • 8/15/2019 Jatigede DAM

    46/51

    IMPOUNDING AREA+

    DAM STRUCTURE

    AND FACILITIES

    4,980.30 Ha

    RESERVOIR 

    4,402.15 Ha

    DAM STRUCTURE

     AND AUXILIARY

    FACILITIES

    578.15 Ha

    PUBLIC AREA 

    3.259 Ha

    FORESTRY AREA 

    1,143.15 Ha

    3,256.44 Ha

    UN-ACQUIRED

    2,56 HaTO BE EVALUATED

    SUBSTITUTED

    521.18 Ha

    UN-SUBSTITUTED

    621.97 Ha

    PROGRAM FY 2013

    92.81 Ha

    PUBLIC AREA 

    332 Ha

    FORESTRY AREA 

    246.15 Ha

     ACQUIRED308.47 Ha

    UN-ACQUIRED

    23.53 Ha

    SUBSTITUTED

    246.15 Ha

    DAM STRUCTURE

     AND WORKING AREA 

    ROAD RELOCATION

    23.53 Ha

    Note: There are claim of un-acquired landtoward land acquisition process from1982-1986, and illegal housing matter

    TO BE PROGRAMMED

    529.16 Ha

  • 8/15/2019 Jatigede DAM

    47/51

    PENYUSUNAN TATA KAWASAN WADUK JATIGEDE

    LANDSCAPE

    ZONING OF JATIGEDE DAM PROJECT AREA

  • 8/15/2019 Jatigede DAM

    48/51

  • 8/15/2019 Jatigede DAM

    49/51

    49

  • 8/15/2019 Jatigede DAM

    50/51

  • 8/15/2019 Jatigede DAM

    51/51