Page 1: Data Kuantitas Dan Harga (Sungai Loeya)

DATA KUANTITAS DAN HARGA

PENGADAAN PEKERJAAN KONSTRUKSI

PENGENDALIAN BANJIR SUNGAI LOEYA (ANAK

SUNGAI IWOIKONDO) KABUPATEN KOLAKA

Page 2: Data Kuantitas Dan Harga (Sungai Loeya)

3,000.00 lv150.00 M

Povinsi Sular€61 Teogga€, (S.

S. Loeys(Anak Sungai qoikondo),

DAFTAR KUANTITAS DAN HARGA

Pergendaiian B6ijLsunga Leya (an a k s! ngai iwoikondo) rcbu pated (olaka

NdnaliesiSungaiP6*ualan Tebins (Pas.Brcnions)

SNVT. P4S Bldang PU Lainnya

Pebaikan Lnfmstlkr$ l\4endsak Penanganan Pas6 Ben€ia Banjn di

Pasampang{an pa. S. Pasa'ipang-salulolong, S. Tambuha, S. oolloho,

2412

NO

VOLUME(M3, lV2,lV ,Buah,

3

L

IL

GENERALI'EM

1. PengukuEn Menanjans, Melinhng dan Gambar

2. lvlobilisasi I D€mob llsas AatBeEl3. Adn dsL€si / Dolumentasi / Pelaporan

4 o4aledng / Pedgeingan

PErcRJMN NORII|AIISASI SUNGAI

1 Galian Tanah ( D6n9an aiai beEi )

PEI(, BANGUNAN PERKUATAXIEBING iPAS. BRONJO!{G)

1. GallanTanah(Manual)

2. Pasangan Brojong Anyaman tlsn (Mekanis)

3. Timbunan Tanah Kembali

3,150.00 Ls

1001s100 Ls

1.00 Ls

1.00 Ls

121632 26 iV3

646 8€ Mr

525 o0 M3

26972 Mr

3176.8013557,5000!

4 000 000 00

2,000,000.00

4,0m,000.00

10,184.27

17050.00

558580.00

23266.73

33.561.120.00

10,006,920.00

13,557,500.00

4.000,000.00

2,000,00000

4,000,000 00

1.312.849.003.,11)

1 312 849 003 40

310.559,306.03

1 1,029,304 00

:93,251,500.00

6,275,502.43

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

CENEFALITEI"I

PEKERJAAN NORMAL SASi SUNGAi

PEK. BANGUNAN PERKUATAN TEB NG (PAS. BRONJONG)

33,564 420.00

1312,849,003.40

310,55S,30603

1,656,972,729.43

165,697 ,272.941,822.670.002.38

1322,670,000.!0

Te&ilang: SATU !/IILYAROELAPAN RATUS DUAPULUH DUAJUTA ENAM RATUSTijJUH P(JLUh RIBU RUPIAH

KE'IERANGAN:

LO$S1 PEKERJAN

Lokas Paket Pekodaan Pengendaliai Banji Sungai Lo€ya Gdak sungai lwoikondo) ini lsetak d Kecamalin Kolaka Kabupalen (olak ya.g bBrtack leb h

ku6ng 190 Km dar pusal lbu Kola Prov Bi Suhw$i Tenggara

Page 3: Data Kuantitas Dan Harga (Sungai Loeya)

tujabal Pembual Kom lmen

Tahun Anggaran

Sumb€rDena

DAFTAR UPAH OAN BAHAN

SU'/T P4S Sidang FU Lannya

r Perbaikan Inirast.uldur [,fendesak Penanganan Pasca Bencana Banjr di Pmvins Subu€sr Tenggam, (S Pasampang_

La{pa, S Pasampang-SalbiDng, S. Tambuha, S ob-Ohflo, S Loeya(Anak Sung€i lndkondo}, S. Tadome|ah, s

Pensendalar Baniir Srngai Loeya (arak s.rnsai lvloikondo) Kehrpalen Kohka

)012APBN

NO URAIAN SATUANHARGA SATUAN

{Rp )KEIERANGAN

1

2

l4

5

6

7

8

I10

11

v13

.

l2

34

5

6

7

Is

10

l112

13

14

t5

l6

1T

21

UPAHPekerla

iukangKepahTukangOpeElor

t,lekanik

Juru Gambar

Pembantu Juru Gamoar

Dnvel

BAHANSobr

0l N,4esin

OI Hidmrc

0lTEnsmisL0l Gear Jabn

0l Gear Swn!

Fi[efl,linyak EliksingKedas llilmeierKenas KakirCatTintaTh€odolle

Balu Gunung / Balu P€cah

Bonjong Ukf.2,00 x 1,00x 0,50 m

Tanah Timbufan

0$ / Hari

0rg / Had

0rg / H3ri

0rg / Hari

Otg IHaIl,O!/Hm0rg / Han

Ofg i Han

Lrier

^gBuah

L'Ller

t4Rol(g

tuahBLrah

Buah

M,

i,13

MI

52,m0.0050,000 00

55,00000

60,000009,500 00

7 500.00

7.000005,000 00

70,000 00

40,000 m60,000 00

40,000 00

7 000 00

I 500 00

22 000.00

22,040M22,000.00

22,W0022,00\0025,000.\0

250 0oo.s16,500s

100,000 m34,000.00

9,000.00

85 000 00

75 000 00

110,m0.00

325,000.00

20 0110.00

Page 4: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Galian Tanah Biasa (manual)

TENAGA

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

4

5

Kuantitas Tenaga :

4.00

3.5 orang4.00

=

14.00

ANALISA TEKNIK

Perkiraan Produksi Tiap Orang (rata -rata)2.00

7.00

7.00 2.00

orang

= 0.2500

- Mandor = =

- Pekerja =3.50

14.00

- Pekerja =14.00

0.7

- Mandor =0.70

= 0.050014.00

Page 5: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Galian Tanah Biasa (alat)

Peralatan Utama = Excavator

Peralatan Penunjang = Alat Bantu (LS)

PERALATAN UTAMA

Alat / Type = Excavator PC - 200

Kapasitas Bucket = m3

Kedalaman Galian (rata - rata) = m

Sudut Swing = O

Kondisi Kerja = Baik

Kondisi Tata Laksana = Sedang

Swell / Faktor Kembang + % =

(tanah basah)

Ukuran Bucket m3 =

Siklus Waktu :

- Pengisian Bucket = detik

- Mengangkat Beban dan Swing = detik

- Dumping (pembuangan) = detik

- Swing Kembali = detik

- Waktu Tetap, Percepatan = detik

Total = detik

Waktu Siklus = jam

Produksi Teoritis / jam = x = m3

Faktor Koreksi :

- Effisiensi Kerja 45 menit / jam =

- =

- = : x % = %

Tanah Biasa m > dalam tabel diambil 50% (interpolasi) Sudut Swing O

optimum > di dapat ( SD )

- Faktor Pengisian Rata - Rata (tabel) =

- Total Faktor Koreksi = x x x =

Produksi Aktual / jam = x = > 28 m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / hari

PERALATAN PENUNJANG

Alat / Type = Alat Bantu (manual), sesuai kebutuhan dan kondisi (LS).

PERALATAN PEMBANTU

Alat / Type = Alat Bantu (manual), sesuai kebutuhan dan kondisi (LS).

TENAGA

Produksi yang menentukan = Excavator

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

2

5

Kuantitas Tenaga :

1.00 ( D )

120

=( q )

( SW )= 0.696

ANALISA TEKNIK

0.75

( Q )

7.00

( WS )

5.00

4.00

34.00

0.01

12.00

6.00

m3

27 1.25 ( SW )

keadaan munjung dan membumbung, diambil

+

( q )

Kapasitas Bucket (padat)

0.765 dalam 0.870

( PS ) 0.377

42.02100

120

( TK )

2.38 , kedalaman

0.765

Faktor Swing dan Kedalaman Galian ( D ) 2.38

( T )( WS )

( Q ) ( T ) 73.78 ( PT )

> 106 Trip / jam

Kondisi Kerja Baik, Tata Laksana Sedang

(tabel)

0.80 ( KK )

Jumlah Trip / jam =1

= 105.88

0.77 ( EK )

28.00

Kwantitas Excavator =1

28.00

28.00

7.00

- Pekerja =196.00

98.00

0.80 ( PS )

196.00

7.00

7.00 28.00 196.00

0.0357 jam

7.00

( PT ) ( TK ) 27.81

( EK ) ( KK ) ( SD )

=

0.0102196.00

2.00=

= 0.0020196.00

-

- Pekerja =

Mandor = orang

98.00

2 orang

0.4

=

=

- Mandor =0.40

Page 6: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Timbunan Kembali Dipadatkan

Peralatan Utama = Hand Compactor

Peralatan Penunjang = Alat Bantu (LS)

PERALATAN UTAMA

Alat / Type = Hand Compactor

Perkiraan Produksi / jam = m3 / jam

PERALATAN PENUNJANG

Alat / Type = Alat Bantu / Sesuai Kebutuhan (LS)

TENAGA

Produksi yang menentukan = Hand Compactor

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

5

5

Kuantitas Tenaga :

ANALISA TEKNIK

0.3333 jam

- Pekerja =21.00

4.20

Kwantitas

21.00

3.00

3.00

7.00

3.007.00

- Pekerja =5.00

Mandor =

Hand Compactor =1

3.00

orang

=

4.20

= 5

1

=

orang

= 0.047621.00

- Mandor =1.00

= 0.238121.00

-

Page 7: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Bronjong (Conventional)

PERALATAN PENUNJANG

Alat / Type = Alat Bantu (Pemotong, Tang dll)

TENAGA

Jam Kerja Effekti per hari = jam

Kemampuan Pekerja (rata - rata) = m3 / hari

Kemampuan Group Pekerja (rata - rata) = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

- Pekerja = 9 orang

- Mandor = 3 orang

- Tukang = 1 orang

Kuantitas Tenaga :

BAHAN

- Batu Isian Bronjong = m3

- Kawat Bronjong (rata - rata) = kg

ANALISA TEKNIK

Kebutuhan Pekerja =10.0

- Pekerja =9.00

1.20

10.00

orang1.20

8.33333 > 9=

7.00

1.10

15.00

= 0.300010.00

= 0.1000- Tukang =1.00

10.00

- Mandor =3.00

= 0.900010.00

Page 8: Data Kuantitas Dan Harga (Sungai Loeya)

A. URAIAN PERALATAN

1 Jenis Alat : Hand Compactor / Stamper

2 Kapasitas ( HP ) : HP

3 Umur Ekonomis ( A ) : Tahun

4 Operasi Alat / Tahun ( W ) : Jam

5 Harga Alat ( B ) : Rp.

B. BIAYA PASTI ALAT / JAM

1 Nilai Sisa ( C ) = 10 % x = Rp.

i x ( 1 + i )A

x ( 1 + )2

( 1 + i )A - 1 ( 1 + ) 2 -

( B - C ) x D + ( i x C )

C. BIAYA OPERASI ALAT / JAM

( % % ) x B % x B

( % % ) x B % x B

( % % ) x HP x

% x x =

( % % ) x HP x

% x x =

5 Operator / Driver ( J ) = Gaji Opertor ( Sopir ) / Jam =

6 Pemb. Operator / Driver ( K ) = Gaji Pembantu Opertor ( Sopir ) / Jam =

7 Biaya Langsung ( L ) = + + + + + =

D. TOTAL BIAYA OPERASI ( M ) = + =

3

= 0.6550.20 1

2 Faktor Angsuran Modal ( D ) =

=

BIAYA OPERASI ALAT

5

2

1,600

10,000,000.00

781.25W W

12.50=

12.50 17.50

( B )

Biaya Pasti / Jam ( E ) =W

= =

1,000,000.00

=0.20 0.20

3,806.82

--->1

12.50 --->

7,000.00

---> 0.60 PELUMAS

15.00 BAHAN BAKAR

Spare Part dan Ban ( F )

2 Bengkel / Perbaikan ( G ) =

3 Bahan Bakar ( H ) =

390.63W W

6.25 ---> 6.25=

8.75=

18,000.000.35 5

19,169

--->

4,375.00

4 Pelumas ( I ) =0.35

---> 12.50 5

---> 315.00

9,500.00

---> 0.00

( H )

( L )

( F ) ( I ) ( J ) ( K )

---> ( E )

( G ) 15,361.88

Page 9: Data Kuantitas Dan Harga (Sungai Loeya)

A. URAIAN PERALATAN

1 Jenis Alat : Exacavator

2 Kapasitas ( HP ) : HP

3 Umur Ekonomis ( A ) : Tahun

4 Operasi Alat / Tahun ( W ) : Jam

5 Harga Alat ( B ) : Rp.

B. BIAYA PASTI ALAT / JAM

1 Nilai Sisa ( C ) = 10 % x = Rp.

i x ( 1 + i )A

x ( 1 + )5

( 1 + i )A - 1 ( 1 + ) 5 -

( B - C ) x D + ( i x C )

C. BIAYA OPERASI ALAT / JAM

( % % ) x B % x B

( % % ) x B % x B

( % % ) x HP x

% x x =

( % % ) x HP x

% x x =

5 Operator / Driver ( J ) = Gaji Opertor ( Sopir ) / Jam =

6 Pemb. Operator / Driver ( K ) = Gaji Pembantu Opertor ( Sopir ) / Jam =

7 Biaya Langsung ( L ) = + + + + + =

D. TOTAL BIAYA OPERASI ( M ) = + =

BIAYA OPERASI ALAT

120

5

2,000

2

800,000,000.00

( B ) 80,000,000.00

3 Biaya Pasti / Jam

Faktor Angsuran Modal ( D ) =

=

Spare Part dan Ban

0.3340.20 1

0.20==

0.20

( E ) = 128,376.69W

50,000.00W W

12.50 ---> 17.50= =

12.50( F ) =

28.75

=

3 Bahan Bakar ( H )

( G )Bengkel / Perbaikan

1

25,000.00W W

6.25 --->=

=

=

15.00 BAHAN BAKAR12.50 --->

6.25

0.35 --->

--->4 Pelumas ( I ) =

127,500.00

0.60 PELUMAS

---> 12.50 120 8,500.00

120

--->

--->

0.35 7,560.00

7,500.00

9,500.00

( J ) ( K ) 227,060.00

18,000.00

( F )

355,437.00

( I )

---> ( E ) ( L )

( H )( G )

Page 10: Data Kuantitas Dan Harga (Sungai Loeya)

TAKSIRAN PRODUKSI ALAT ( Excavator )

GALIAN TANAH BIASA

Basikn Kapasiti =

Kapasitas Backet = M3

Faktor Material/Bucket =

q = M3

Waktu Siklus (CT)

- Manuver Track = detik Efisiensi/Job Faktor (E)

- Waktu Gali + Muat = detik

- Waktu Putar Berisi = detik - Faktor Operator

- Waktu Buang = detik - Faktor Alat

- Waktu Putar Kosong = detik - Faktor Management

Jumlah Siklus (CT) = detik Efisiensi/Job Faktor (E)

Produksi Alat = M3/Jam

Koefisien Alat =

1

0.80

0.90

q

29.5

=

0.90

0.690

0.710

0.900

0.441

38.74029559

=

=

=

=

=

0.72 0.441X X

38.74029559

=

60 x 60

0.0258129

29.5

0.72

3.5

4.5

x 0.80

10

7

4.5

Page 11: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran Memanjang, Melintang dan Gambar

Harga Satuan : Rp. 3,176.80 /M'

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Juru Ukur Org/Hari 0.0070 70,000.00 490.00

2. Pembantu Juru Ukur Org/Hari 0.0022 40,000.00 88.00

3. Juru Gambar Org/Hari 0.0022 60,000.00 132.00

4. Pembantu Juru Gambar Org/Hari 0.0100 40,000.00 400.00

II. B A H A N

1. Cat Kg 0.0010 34,000.00 34.00

2. Kertas Milimeter Bh 0.0010 15,000.00 15.00

3. Kertas Kalkir Rol 0.0060 100,000.00 600.00

4. T i n t a Bh 0.0010 9,000.00 9.00

III. PERALATAN

1. Thedolite Bh 0.0070 85,000.00 595.00

2. Waterpass Bh 0.0070 75,000.00 525.00

IV Jumlah = ( I + II + III ) Rp. 2,888.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 288.80

VI Harga Satuan = ( IV + V ) Rp. 3,176.80

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mobilisasi / Demobilisasi Alat dan Perlengkapan

Harga Satuan : Rp. 13,557,500.00 /Unit

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

II. B A H A N

III. PERALATAN Ls 1.0000 12,325,000.00 12,325,000.00

IV Jumlah = ( I + II + III ) Rp. 12,325,000.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 1,232,500.00

VI Harga Satuan = ( IV + V ) Rp. 13,557,500.00

NO U R A I A NHARGA SATUAN JUMLAH HARGA

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 12: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa ( Manual )

Harga Satuan : Rp. 17,050.00 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.2500 52,000.00 13,000.00

2. Mandor Org/Hari 0.0500 50,000.00 2,500.00

II. B A H A N

III. PERALATAN

IV Jumlah = ( I + II + III ) Rp. 15,500.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 1,550.00

VI Harga Satuan = ( IV + V ) Rp. 17,050.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah (Dengan Alat Berat)

Harga Satuan : Rp. 10,788.27 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.0102 52,000.00 530.61

2. Mandor Org/Hari 0.0020 50,000.00 102.04

II. B A H A N

III. PERALATAN

1. Excavator Jam 0.0258 355,437.00 9,174.87

IV Jumlah = ( I + II + III ) Rp. 9,807.52

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 980.75

VI Harga Satuan = ( IV + V ) Rp. 10,788.27

NO U R A I A NHARGA SATUAN JUMLAH HARGA

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 13: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah Kembali

Harga Satuan : Rp. 23,266.73 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.2381 52,000.00 12,380.95

2. Mandor Org/Hari 0.0476 50,000.00 2,380.95

II. B A H A N

III. PERALATAN

Hand Compactor Jam 0.3333 19,169.00 6,389.67

IV Jumlah = ( I + II + III ) Rp. 21,151.57

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 2,115.16

VI Harga Satuan = ( IV + V ) Rp. 23,266.73

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 14: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Bronjong Anyaman Mesin (Mekanis)

Harga Satuan : Rp. 558,580.00 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.9000 52,000.00 46,800.00

2. Mandor Org/Hari 0.3000 50,000.00 15,000.00

II. B A H A N

1. Bronjong Ukuran 2 x 1 x 0,5 m Bh 1.0000 325,000.00 325,000.00

2. Batu Gunung / Kali M3

1.1000 110,000.00 121,000.00

III. PERALATAN

IV Jumlah = ( I + II + III ) Rp. 507,800.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 50,780.00

VI Harga Satuan = ( IV + V ) Rp. 558,580.00

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 15: Data Kuantitas Dan Harga (Sungai Loeya)

Jenis Pekerjaan : Mobilisasi dan Demobilisasi Alat dan Perlengkapannya

Harga Satuan : Rp. 12,325,000

HARGA JUMLAH

No. U R A I A N SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. Sewa Tanah Ls 0 0 0

B. PERALATAN

5,200,000

C. FASILITAS KONTRAKTOR

1 Base Camp Ls 100.00 30,000 3,000,000

2 Kantor Ls 25.00 25,000 625,000

3 Bengkel Ls 60.00 15,000 900,000

D. DEMOBILISASI LS 1.00 2,600,000 2,600,000

Total Biaya Mobilisasi 12,325,000

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba

serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

HARGA JUMLAH

No. JENIS ALAT SATUAN VOL. SATUAN HARGA

(Rp.) (Rp.)

B. PERALATAN

1 Excavator Unit 2.00 2,500,000 5,000,000

2 Hand Compactor Unit 1.00 200,000 200,000

Biaya Mobilisasi Alat Berat dan Perlengkapan 5,200,000

ANALISA HARGA SATUAN PEKERJAAN

Periksa lembar Biaya Mobilisasi Alat dan

Perlengkapan