Data Kuantitas Dan Harga (Sungai Loeya)

15
DATA KUANTITAS DAN HARGA PENGADAAN PEKERJAAN KONSTRUKSI PENGENDALIAN BANJIR SUNGAI LOEYA (ANAK SUNGAI IWOIKONDO) KABUPATEN KOLAKA

Transcript of Data Kuantitas Dan Harga (Sungai Loeya)

Page 1: Data Kuantitas Dan Harga (Sungai Loeya)

DATA KUANTITAS DAN HARGA

PENGADAAN PEKERJAAN KONSTRUKSI

PENGENDALIAN BANJIR SUNGAI LOEYA (ANAK

SUNGAI IWOIKONDO) KABUPATEN KOLAKA

Page 2: Data Kuantitas Dan Harga (Sungai Loeya)

3,000.00 lv150.00 M

Povinsi Sular€61 Teogga€, (S.

S. Loeys(Anak Sungai qoikondo),

DAFTAR KUANTITAS DAN HARGA

Pergendaiian B6ijLsunga Leya (an a k s! ngai iwoikondo) rcbu pated (olaka

NdnaliesiSungaiP6*ualan Tebins (Pas.Brcnions)

SNVT. P4S Bldang PU Lainnya

Pebaikan Lnfmstlkr$ l\4endsak Penanganan Pas6 Ben€ia Banjn di

Pasampang{an pa. S. Pasa'ipang-salulolong, S. Tambuha, S. oolloho,

2412

NO

VOLUME(M3, lV2,lV ,Buah,

3

L

IL

GENERALI'EM

1. PengukuEn Menanjans, Melinhng dan Gambar

2. lvlobilisasi I D€mob llsas AatBeEl3. Adn dsL€si / Dolumentasi / Pelaporan

4 o4aledng / Pedgeingan

PErcRJMN NORII|AIISASI SUNGAI

1 Galian Tanah ( D6n9an aiai beEi )

PEI(, BANGUNAN PERKUATAXIEBING iPAS. BRONJO!{G)

1. GallanTanah(Manual)

2. Pasangan Brojong Anyaman tlsn (Mekanis)

3. Timbunan Tanah Kembali

3,150.00 Ls

1001s100 Ls

1.00 Ls

1.00 Ls

121632 26 iV3

646 8€ Mr

525 o0 M3

26972 Mr

3176.8013557,5000!

4 000 000 00

2,000,000.00

4,0m,000.00

10,184.27

17050.00

558580.00

23266.73

33.561.120.00

10,006,920.00

13,557,500.00

4.000,000.00

2,000,00000

4,000,000 00

1.312.849.003.,11)

1 312 849 003 40

310.559,306.03

1 1,029,304 00

:93,251,500.00

6,275,502.43

REKAPITULASI DAFTAR KUANTITAS DAN HARGA

CENEFALITEI"I

PEKERJAAN NORMAL SASi SUNGAi

PEK. BANGUNAN PERKUATAN TEB NG (PAS. BRONJONG)

33,564 420.00

1312,849,003.40

310,55S,30603

1,656,972,729.43

165,697 ,272.941,822.670.002.38

1322,670,000.!0

Te&ilang: SATU !/IILYAROELAPAN RATUS DUAPULUH DUAJUTA ENAM RATUSTijJUH P(JLUh RIBU RUPIAH

KE'IERANGAN:

LO$S1 PEKERJAN

Lokas Paket Pekodaan Pengendaliai Banji Sungai Lo€ya Gdak sungai lwoikondo) ini lsetak d Kecamalin Kolaka Kabupalen (olak ya.g bBrtack leb h

ku6ng 190 Km dar pusal lbu Kola Prov Bi Suhw$i Tenggara

Page 3: Data Kuantitas Dan Harga (Sungai Loeya)

tujabal Pembual Kom lmen

Tahun Anggaran

Sumb€rDena

DAFTAR UPAH OAN BAHAN

SU'/T P4S Sidang FU Lannya

r Perbaikan Inirast.uldur [,fendesak Penanganan Pasca Bencana Banjr di Pmvins Subu€sr Tenggam, (S Pasampang_

La{pa, S Pasampang-SalbiDng, S. Tambuha, S ob-Ohflo, S Loeya(Anak Sung€i lndkondo}, S. Tadome|ah, s

Pensendalar Baniir Srngai Loeya (arak s.rnsai lvloikondo) Kehrpalen Kohka

)012APBN

NO URAIAN SATUANHARGA SATUAN

{Rp )KEIERANGAN

1

2

l4

5

6

7

8

I10

11

v13

.

l2

34

5

6

7

Is

10

l112

13

14

t5

l6

1T

21

UPAHPekerla

iukangKepahTukangOpeElor

t,lekanik

Juru Gambar

Pembantu Juru Gamoar

Dnvel

BAHANSobr

0l N,4esin

OI Hidmrc

0lTEnsmisL0l Gear Jabn

0l Gear Swn!

Fi[efl,linyak EliksingKedas llilmeierKenas KakirCatTintaTh€odolle

Balu Gunung / Balu P€cah

Bonjong Ukf.2,00 x 1,00x 0,50 m

Tanah Timbufan

0$ / Hari

0rg / Had

0rg / H3ri

0rg / Hari

Otg IHaIl,O!/Hm0rg / Han

Ofg i Han

Lrier

^gBuah

L'Ller

t4Rol(g

tuahBLrah

Buah

M,

i,13

MI

52,m0.0050,000 00

55,00000

60,000009,500 00

7 500.00

7.000005,000 00

70,000 00

40,000 m60,000 00

40,000 00

7 000 00

I 500 00

22 000.00

22,040M22,000.00

22,W0022,00\0025,000.\0

250 0oo.s16,500s

100,000 m34,000.00

9,000.00

85 000 00

75 000 00

110,m0.00

325,000.00

20 0110.00

Page 4: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Galian Tanah Biasa (manual)

TENAGA

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

4

5

Kuantitas Tenaga :

4.00

3.5 orang4.00

=

14.00

ANALISA TEKNIK

Perkiraan Produksi Tiap Orang (rata -rata)2.00

7.00

7.00 2.00

orang

= 0.2500

- Mandor = =

- Pekerja =3.50

14.00

- Pekerja =14.00

0.7

- Mandor =0.70

= 0.050014.00

Page 5: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Galian Tanah Biasa (alat)

Peralatan Utama = Excavator

Peralatan Penunjang = Alat Bantu (LS)

PERALATAN UTAMA

Alat / Type = Excavator PC - 200

Kapasitas Bucket = m3

Kedalaman Galian (rata - rata) = m

Sudut Swing = O

Kondisi Kerja = Baik

Kondisi Tata Laksana = Sedang

Swell / Faktor Kembang + % =

(tanah basah)

Ukuran Bucket m3 =

Siklus Waktu :

- Pengisian Bucket = detik

- Mengangkat Beban dan Swing = detik

- Dumping (pembuangan) = detik

- Swing Kembali = detik

- Waktu Tetap, Percepatan = detik

Total = detik

Waktu Siklus = jam

Produksi Teoritis / jam = x = m3

Faktor Koreksi :

- Effisiensi Kerja 45 menit / jam =

- =

- = : x % = %

Tanah Biasa m > dalam tabel diambil 50% (interpolasi) Sudut Swing O

optimum > di dapat ( SD )

- Faktor Pengisian Rata - Rata (tabel) =

- Total Faktor Koreksi = x x x =

Produksi Aktual / jam = x = > 28 m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / hari

PERALATAN PENUNJANG

Alat / Type = Alat Bantu (manual), sesuai kebutuhan dan kondisi (LS).

PERALATAN PEMBANTU

Alat / Type = Alat Bantu (manual), sesuai kebutuhan dan kondisi (LS).

TENAGA

Produksi yang menentukan = Excavator

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

2

5

Kuantitas Tenaga :

1.00 ( D )

120

=( q )

( SW )= 0.696

ANALISA TEKNIK

0.75

( Q )

7.00

( WS )

5.00

4.00

34.00

0.01

12.00

6.00

m3

27 1.25 ( SW )

keadaan munjung dan membumbung, diambil

+

( q )

Kapasitas Bucket (padat)

0.765 dalam 0.870

( PS ) 0.377

42.02100

120

( TK )

2.38 , kedalaman

0.765

Faktor Swing dan Kedalaman Galian ( D ) 2.38

( T )( WS )

( Q ) ( T ) 73.78 ( PT )

> 106 Trip / jam

Kondisi Kerja Baik, Tata Laksana Sedang

(tabel)

0.80 ( KK )

Jumlah Trip / jam =1

= 105.88

0.77 ( EK )

28.00

Kwantitas Excavator =1

28.00

28.00

7.00

- Pekerja =196.00

98.00

0.80 ( PS )

196.00

7.00

7.00 28.00 196.00

0.0357 jam

7.00

( PT ) ( TK ) 27.81

( EK ) ( KK ) ( SD )

=

0.0102196.00

2.00=

= 0.0020196.00

-

- Pekerja =

Mandor = orang

98.00

2 orang

0.4

=

=

- Mandor =0.40

Page 6: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Timbunan Kembali Dipadatkan

Peralatan Utama = Hand Compactor

Peralatan Penunjang = Alat Bantu (LS)

PERALATAN UTAMA

Alat / Type = Hand Compactor

Perkiraan Produksi / jam = m3 / jam

PERALATAN PENUNJANG

Alat / Type = Alat Bantu / Sesuai Kebutuhan (LS)

TENAGA

Produksi yang menentukan = Hand Compactor

= m3 / jam

Jam Kerja Effekti per hari = jam

Produksi / hari = x = m3 / jam

Kebutuhan Tenaga :

- Pekerja = 5 orang

- Mandor = 1 orang

Kemampuan Pekerja / Group Mandor = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

5

5

Kuantitas Tenaga :

ANALISA TEKNIK

0.3333 jam

- Pekerja =21.00

4.20

Kwantitas

21.00

3.00

3.00

7.00

3.007.00

- Pekerja =5.00

Mandor =

Hand Compactor =1

3.00

orang

=

4.20

= 5

1

=

orang

= 0.047621.00

- Mandor =1.00

= 0.238121.00

-

Page 7: Data Kuantitas Dan Harga (Sungai Loeya)

Nama Pekerjaan = Bronjong (Conventional)

PERALATAN PENUNJANG

Alat / Type = Alat Bantu (Pemotong, Tang dll)

TENAGA

Jam Kerja Effekti per hari = jam

Kemampuan Pekerja (rata - rata) = m3 / hari

Kemampuan Group Pekerja (rata - rata) = m3 / hari

Jumlah Tenaga Ideal / Group Mandor :

- Pekerja = 9 orang

- Mandor = 3 orang

- Tukang = 1 orang

Kuantitas Tenaga :

BAHAN

- Batu Isian Bronjong = m3

- Kawat Bronjong (rata - rata) = kg

ANALISA TEKNIK

Kebutuhan Pekerja =10.0

- Pekerja =9.00

1.20

10.00

orang1.20

8.33333 > 9=

7.00

1.10

15.00

= 0.300010.00

= 0.1000- Tukang =1.00

10.00

- Mandor =3.00

= 0.900010.00

Page 8: Data Kuantitas Dan Harga (Sungai Loeya)

A. URAIAN PERALATAN

1 Jenis Alat : Hand Compactor / Stamper

2 Kapasitas ( HP ) : HP

3 Umur Ekonomis ( A ) : Tahun

4 Operasi Alat / Tahun ( W ) : Jam

5 Harga Alat ( B ) : Rp.

B. BIAYA PASTI ALAT / JAM

1 Nilai Sisa ( C ) = 10 % x = Rp.

i x ( 1 + i )A

x ( 1 + )2

( 1 + i )A - 1 ( 1 + ) 2 -

( B - C ) x D + ( i x C )

C. BIAYA OPERASI ALAT / JAM

( % % ) x B % x B

( % % ) x B % x B

( % % ) x HP x

% x x =

( % % ) x HP x

% x x =

5 Operator / Driver ( J ) = Gaji Opertor ( Sopir ) / Jam =

6 Pemb. Operator / Driver ( K ) = Gaji Pembantu Opertor ( Sopir ) / Jam =

7 Biaya Langsung ( L ) = + + + + + =

D. TOTAL BIAYA OPERASI ( M ) = + =

3

= 0.6550.20 1

2 Faktor Angsuran Modal ( D ) =

=

BIAYA OPERASI ALAT

5

2

1,600

10,000,000.00

781.25W W

12.50=

12.50 17.50

( B )

Biaya Pasti / Jam ( E ) =W

= =

1,000,000.00

=0.20 0.20

3,806.82

--->1

12.50 --->

7,000.00

---> 0.60 PELUMAS

15.00 BAHAN BAKAR

Spare Part dan Ban ( F )

2 Bengkel / Perbaikan ( G ) =

3 Bahan Bakar ( H ) =

390.63W W

6.25 ---> 6.25=

8.75=

18,000.000.35 5

19,169

--->

4,375.00

4 Pelumas ( I ) =0.35

---> 12.50 5

---> 315.00

9,500.00

---> 0.00

( H )

( L )

( F ) ( I ) ( J ) ( K )

---> ( E )

( G ) 15,361.88

Page 9: Data Kuantitas Dan Harga (Sungai Loeya)

A. URAIAN PERALATAN

1 Jenis Alat : Exacavator

2 Kapasitas ( HP ) : HP

3 Umur Ekonomis ( A ) : Tahun

4 Operasi Alat / Tahun ( W ) : Jam

5 Harga Alat ( B ) : Rp.

B. BIAYA PASTI ALAT / JAM

1 Nilai Sisa ( C ) = 10 % x = Rp.

i x ( 1 + i )A

x ( 1 + )5

( 1 + i )A - 1 ( 1 + ) 5 -

( B - C ) x D + ( i x C )

C. BIAYA OPERASI ALAT / JAM

( % % ) x B % x B

( % % ) x B % x B

( % % ) x HP x

% x x =

( % % ) x HP x

% x x =

5 Operator / Driver ( J ) = Gaji Opertor ( Sopir ) / Jam =

6 Pemb. Operator / Driver ( K ) = Gaji Pembantu Opertor ( Sopir ) / Jam =

7 Biaya Langsung ( L ) = + + + + + =

D. TOTAL BIAYA OPERASI ( M ) = + =

BIAYA OPERASI ALAT

120

5

2,000

2

800,000,000.00

( B ) 80,000,000.00

3 Biaya Pasti / Jam

Faktor Angsuran Modal ( D ) =

=

Spare Part dan Ban

0.3340.20 1

0.20==

0.20

( E ) = 128,376.69W

50,000.00W W

12.50 ---> 17.50= =

12.50( F ) =

28.75

=

3 Bahan Bakar ( H )

( G )Bengkel / Perbaikan

1

25,000.00W W

6.25 --->=

=

=

15.00 BAHAN BAKAR12.50 --->

6.25

0.35 --->

--->4 Pelumas ( I ) =

127,500.00

0.60 PELUMAS

---> 12.50 120 8,500.00

120

--->

--->

0.35 7,560.00

7,500.00

9,500.00

( J ) ( K ) 227,060.00

18,000.00

( F )

355,437.00

( I )

---> ( E ) ( L )

( H )( G )

Page 10: Data Kuantitas Dan Harga (Sungai Loeya)

TAKSIRAN PRODUKSI ALAT ( Excavator )

GALIAN TANAH BIASA

Basikn Kapasiti =

Kapasitas Backet = M3

Faktor Material/Bucket =

q = M3

Waktu Siklus (CT)

- Manuver Track = detik Efisiensi/Job Faktor (E)

- Waktu Gali + Muat = detik

- Waktu Putar Berisi = detik - Faktor Operator

- Waktu Buang = detik - Faktor Alat

- Waktu Putar Kosong = detik - Faktor Management

Jumlah Siklus (CT) = detik Efisiensi/Job Faktor (E)

Produksi Alat = M3/Jam

Koefisien Alat =

1

0.80

0.90

q

29.5

=

0.90

0.690

0.710

0.900

0.441

38.74029559

=

=

=

=

=

0.72 0.441X X

38.74029559

=

60 x 60

0.0258129

29.5

0.72

3.5

4.5

x 0.80

10

7

4.5

Page 11: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran Memanjang, Melintang dan Gambar

Harga Satuan : Rp. 3,176.80 /M'

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Juru Ukur Org/Hari 0.0070 70,000.00 490.00

2. Pembantu Juru Ukur Org/Hari 0.0022 40,000.00 88.00

3. Juru Gambar Org/Hari 0.0022 60,000.00 132.00

4. Pembantu Juru Gambar Org/Hari 0.0100 40,000.00 400.00

II. B A H A N

1. Cat Kg 0.0010 34,000.00 34.00

2. Kertas Milimeter Bh 0.0010 15,000.00 15.00

3. Kertas Kalkir Rol 0.0060 100,000.00 600.00

4. T i n t a Bh 0.0010 9,000.00 9.00

III. PERALATAN

1. Thedolite Bh 0.0070 85,000.00 595.00

2. Waterpass Bh 0.0070 75,000.00 525.00

IV Jumlah = ( I + II + III ) Rp. 2,888.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 288.80

VI Harga Satuan = ( IV + V ) Rp. 3,176.80

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mobilisasi / Demobilisasi Alat dan Perlengkapan

Harga Satuan : Rp. 13,557,500.00 /Unit

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

II. B A H A N

III. PERALATAN Ls 1.0000 12,325,000.00 12,325,000.00

IV Jumlah = ( I + II + III ) Rp. 12,325,000.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 1,232,500.00

VI Harga Satuan = ( IV + V ) Rp. 13,557,500.00

NO U R A I A NHARGA SATUAN JUMLAH HARGA

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 12: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa ( Manual )

Harga Satuan : Rp. 17,050.00 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.2500 52,000.00 13,000.00

2. Mandor Org/Hari 0.0500 50,000.00 2,500.00

II. B A H A N

III. PERALATAN

IV Jumlah = ( I + II + III ) Rp. 15,500.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 1,550.00

VI Harga Satuan = ( IV + V ) Rp. 17,050.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah (Dengan Alat Berat)

Harga Satuan : Rp. 10,788.27 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.0102 52,000.00 530.61

2. Mandor Org/Hari 0.0020 50,000.00 102.04

II. B A H A N

III. PERALATAN

1. Excavator Jam 0.0258 355,437.00 9,174.87

IV Jumlah = ( I + II + III ) Rp. 9,807.52

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 980.75

VI Harga Satuan = ( IV + V ) Rp. 10,788.27

NO U R A I A NHARGA SATUAN JUMLAH HARGA

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 13: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah Kembali

Harga Satuan : Rp. 23,266.73 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.2381 52,000.00 12,380.95

2. Mandor Org/Hari 0.0476 50,000.00 2,380.95

II. B A H A N

III. PERALATAN

Hand Compactor Jam 0.3333 19,169.00 6,389.67

IV Jumlah = ( I + II + III ) Rp. 21,151.57

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 2,115.16

VI Harga Satuan = ( IV + V ) Rp. 23,266.73

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 14: Data Kuantitas Dan Harga (Sungai Loeya)

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Bronjong Anyaman Mesin (Mekanis)

Harga Satuan : Rp. 558,580.00 /M3

SATUAN KUANTITAS

( Rp ) ( Rp. )

I. U P A H

1. Pekerja Org/Hari 0.9000 52,000.00 46,800.00

2. Mandor Org/Hari 0.3000 50,000.00 15,000.00

II. B A H A N

1. Bronjong Ukuran 2 x 1 x 0,5 m Bh 1.0000 325,000.00 325,000.00

2. Batu Gunung / Kali M3

1.1000 110,000.00 121,000.00

III. PERALATAN

IV Jumlah = ( I + II + III ) Rp. 507,800.00

V Biaya Umum dan Keuntungan = ( 10% x IV ) Rp. 50,780.00

VI Harga Satuan = ( IV + V ) Rp. 558,580.00

NO U R A I A NHARGA SATUAN JUMLAH HARGA

Page 15: Data Kuantitas Dan Harga (Sungai Loeya)

Jenis Pekerjaan : Mobilisasi dan Demobilisasi Alat dan Perlengkapannya

Harga Satuan : Rp. 12,325,000

HARGA JUMLAH

No. U R A I A N SATUAN KUANTITAS SATUAN HARGA

(Rp.) (Rp.)

A. Sewa Tanah Ls 0 0 0

B. PERALATAN

5,200,000

C. FASILITAS KONTRAKTOR

1 Base Camp Ls 100.00 30,000 3,000,000

2 Kantor Ls 25.00 25,000 625,000

3 Bengkel Ls 60.00 15,000 900,000

D. DEMOBILISASI LS 1.00 2,600,000 2,600,000

Total Biaya Mobilisasi 12,325,000

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba

serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

HARGA JUMLAH

No. JENIS ALAT SATUAN VOL. SATUAN HARGA

(Rp.) (Rp.)

B. PERALATAN

1 Excavator Unit 2.00 2,500,000 5,000,000

2 Hand Compactor Unit 1.00 200,000 200,000

Biaya Mobilisasi Alat Berat dan Perlengkapan 5,200,000

ANALISA HARGA SATUAN PEKERJAAN

Periksa lembar Biaya Mobilisasi Alat dan

Perlengkapan