WEST VIRGINIA ECONOMIC DEVELOPMENT
AUTHORITY
REQUEST FOR QUALIFICATIONS
FOR DEMOLITION AND REMEDIATION
OF THE
FORMER CENTURY ALUMINUM PLANT
LOCATED NEAR
MILLWOOD, JACKSON COUNTY, WEST VIRGINIA
____________________________________
Date of Issue: February 2, 2022 Response Deadline: 3:00 PM (EST) Friday, February 25, 2022
Response Submission to: WV Economic Development Authority ATTN: Kris Warner, Executive Director 180 Association Drive Northgate Business Park Charleston, West Virginia 25311
Request for Qualifications Environmental Remediation Services – Former Century Aluminum _____________________________________________________________________________________
WVEDA, 180 Association Drive, Northgate Business Park, Charleston, WV 25311 2 | P a g e
LEGAL NOTICE WEST VIRIGNIA ECONOMIC DEVELOPMENT AUTHORITY
REQUEST FOR QUALIFICATIONS FOR DEMOLITION AND REMEDIATION OF THE FORMER CENTURY ALUMINUM PLANT
MILLWOOD, JACKSON COUNTY, WEST VIRGINIA
The West Virginia Economic Development Authority (WVEDA) solicits Statements of Qualifications (SOQ) from demolition and remediation firms interested in performing all aspects of project management and professional services involved with the demolition, removal, remediation, and disposal associated with the former Century Aluminum Plant located near Millwood, Jackson County, West Virginia. The former aluminum plant is located between Millwood and Ravenswood, WV adjacent to the Ohio River. The demolition and remediation services are subject to terms and conditions set forth in detail in the Request for Qualifications (“RFQ”). Copies of the RFQ may be obtained at the above address, Monday through Friday between 9:00 AM and 3:00 PM (holidays excepted) or may downloaded from https://eda.wv.gov/about/Pages/Meeting-Minutes-&-Public-Information.aspx Procurement of said services shall be in accordance with 2 CFR 200.320 (d) (5) and West Virginia Code Chapter 5G. All firms interested in being considered for this project must submit a SOQ detailing qualifications, technical expertise, management and staffing capabilities and related prior experience. Respondents will be required to provide proof of insurance and policy limitations including workers’ compensation insurance, in the form of an insurance certificate. Additionally respondents will be required to provide proof of good standing with the State of West Virginia Tax Department. Respondents should demonstrate proof, in the form of a letter from a surety company, of the ability to obtain a payment and performance bond in the minimum amount of the contract amount. The object of the competitive process is to objectively identify qualified firms who will provide the highest quality of service. Accordingly, technical qualifications and experience will be weighed heavily. Selected respondents will be interviewed, and the WVEDA will rank the three most qualified respondents, who will then be asked to proceed under a request for proposal process to submit bids for the project. An original and five (5) copies of all requested information should be mailed or delivered to: West Virginia Economic Development Authority ATTN: Kris Warner, Executive Director 180 Association Drive, Northgate Business Park Charleston, West Virginia 25311 Responses must be received by 3:00 PM EST on Friday, February 25, 2022. Qualifications received after 3:00 pm will not be accepted. The proposals must be sealed and clearly marked “RFQ Response for Former Century Aluminum” in the lower left corner. Faxed or electronically‐mailed (emailed) submissions will not be accepted. The WVEDA will afford full opportunity for minority business enterprises to submit a SOQ in response to this invitation and will not discriminate against any interested firm or individual on the grounds of race, creed, color, sex, age, handicap or national origin in the contract award. The WVEDA reserves the right to accept or reject any and/or all proposals.
Request for Qualifications Environmental Remediation Services – Former Century Aluminum _____________________________________________________________________________________
WVEDA, 180 Association Drive, Northgate Business Park, Charleston, WV 25311 3 | P a g e
All questions regarding this RFQ shall be received in writing by email to the Executive Director of WVEDA, Kris Warner ([email protected]). A mandatory site visit will be held on Tuesday, February 15, 2022 starting at 9:00 A.M. Questions are due no later than Wednesday, February 23, 2022. Kris Warner Executive Director, West Virginia Economic Development Authority
Request for Qualifications Environmental Remediation Services – Former Century Aluminum _____________________________________________________________________________________
WVEDA, 180 Association Drive, Northgate Business Park, Charleston, WV 25311 4 | P a g e
REQUEST FOR QUALIFICATIONS
1.0 Project Overview and Background The West Virginia Economic Development Authority (WVEDA) owns approximately 2,200 acres of land that includes the site of the former Century Aluminum of West Virginia, Inc. (CAWV) plant near Millwood, Jackson County, West Virginia. The site is the location of the former Kaiser Aluminum plant that was established in 1954. The former aluminum plant is located between Millwood and Ravenswood, WV along Century Road and adjacent to the Ohio River. Refer to Appendix A – Site Maps for site maps showing the location of the site and the approximate property boundaries. The plant was idled by CAWV in 2009 and closed in 2015. The site was purchased by Applied Partners, Inc. in 2017. Applied Partners, Inc. planned to demolish the aluminum smelter and other site structures to facilitate redevelopment of the site. Demolition was started in late January 2017 and partially completed. WVEDA acquired the site via a deed in lieu of foreclosure in 2020. There are currently several structures that are partially demolished, some of which may contain Asbestos Containing Materials (ACM). In August 2021, WVEDA retained Greenbrier Environmental Group, Inc. (GEG) to visit the site, meet with the West Virginia Department of Environmental Protection (WVDEP) and review available regulatory files associated with the site. Refer to Appendix B – Environmental Regulatory Summary for a document prepared by GEG that summarizes the discussions with the WVDEP and known environmental regulatory issues associated with the site. The WVEDA solicits Statements of Qualifications (SOQ) from demolition and remediation firms interested in performing all aspects of demolition and environmental remediation of the former Century Aluminum Plant located near Millwood, Jackson County, West Virginia. The selected firm will work with the WVEDA to develop a scope of work that will include, but not be limited to, the following tasks:
Disposal of, recycling, or management of all existing demolition debris including abatement and management of ACM;
Demolition and/or decommissioning of structures, equipment, storage tanks, apparatus, piping, infrastructure present at the site;
Waste characterization and disposal/management; Remediation of the site to address all known environmental issues identified in the document
prepared by GEG and included as Appendix B; and, Site reclamation to facilitate redevelopment.
Environmental remediation must be completed in accordance with all applicable Federal, State, and local regulations. 2.0 Statement of Qualifications Submission Deadline
An original and five (5) copies of all requested information should be mailed or delivered to: West Virginia Economic Development Authority ATTN: Kris Warner, Executive Director 180 Association Drive, Northgate Business Park Charleston, West Virginia 25311 Responses must be received by 3:00 PM EST on Friday, February 25, 2022. Qualifications received after 3:00 pm will not be accepted. The proposals must be sealed and clearly marked “RFQ Response for Former
Request for Qualifications Environmental Remediation Services – Former Century Aluminum _____________________________________________________________________________________
WVEDA, 180 Association Drive, Northgate Business Park, Charleston, WV 25311 5 | P a g e
Century Aluminum” in the lower left corner. Faxed or electronically‐mailed (emailed) submissions will not be accepted.
3.0 Request for Qualifications Contact The contact regarding this RFQ process is WVEDA Executive Director, Kris Warner. Prospective applicants may make inquiries to obtain clarification of the requirements contained in this RFQ. All questions regarding this RFQ shall be received in writing by email to the Executive Director of WVEDA, Kris Warner ([email protected]). A mandatory site visit will be held on February 15, 2022 starting at 9:00 A.M. Questions are due no later than Wednesday, February 23, 2022. 4.0 Statement of Qualifications Format Proposals should be limited to 20 numbered pages. Please include a cover letter that identifies a contact person and all call information. The following format is not required but is encouraged to provide consistency between proposals, aiding in evaluation and comparison. If the format is modified, please include the following information at a minimum:
i. Project Approach: Describe your team’s approach to successfully delivering the project. Provide details on how each task will be completed. Include any recommendations for maximizing effectiveness and efficiency. ii. Relevant Project Experience: Provide a summary of your experience with similar projects, including location and client contact information. Specify the services provided, the office location from which the work was performed, and staff members’ responsibilities. Web links to recent plans and past work, if available, may be included in addition to project summaries. iii. Project Team: Provide an organizational chart identifying all staff assigned to the project, including any sub-contractors, defining roles, responsibilities, and task assignments of each member for the duration of the project. iv. Qualifications of Personnel: Provide relevant experience and qualifications of all personnel assigned to the project. v. Scope of Work: Provide an outline for keeping the project on schedule and within budget. Include projected workloads and staff availability, as well as a projected schedule for completion of significant milestones. vi. References: Provide contact information for at least three references for clients familiar with your work. vii. Insurance; Good Standing: Provide proof of insurance and policy limitations including workers’ compensation insurance, in the form of an insurance certificate. Provide proof of good standing with the State of West Virginia Tax Department. viii. Bonding Capacity: Provide proof, in the form of a letter from a surety company, of the ability to obtain a payment and performance bond in the minimum amount of the contract amount.
5.0 Evaluation Criteria SOQs should address all aspects of the RFQ and clearly express an understanding of the requirements and qualifications to conduct these services in a thorough and efficient manner. SOQs will be evaluated by a committee appointed by the WVEDA. SOQs will be evaluated on the firm’s ability to meet the requirements of this RFQ. Some evaluation criteria, among other factors, will include:
I. Project approach and demonstrated understanding of the goals for the site; II. Creativity and vision for overall project;
Request for Qualifications Environmental Remediation Services – Former Century Aluminum _____________________________________________________________________________________
WVEDA, 180 Association Drive, Northgate Business Park, Charleston, WV 25311 6 | P a g e
III. Familiarity with and understanding the nature and challenges of the project; IV. Qualifications and availability of staff assigned to the project; V. Relevant project experience; VI. References.
Candidate firms may be asked to present their proposal to a committee appointed by the WVEDA before the final selection is made. Final selection and contracting will be subject to approval by the WVEDA Board of Directors.
6.0 Project Schedule It is anticipated that the firm will be able to accomplish all tasks and deliver a site that is ready for development within 18 months. 7.0 Administrative Information All proposals become the property of the WVEDA upon submission and will only be returned at the WVEDA’s option. Any restrictions on the use of the data contained within must be clearly stated in the SOQ itself. The cost of preparing, submitting and presenting a SOQ is the sole expense of the proposing firm. The WVEDA is not liable for any costs prior to issuance of a signed contract. The WVEDA reserves the right to reject any and all SOQs, to consider alternatives, to waive irregularities and to re-solicit a RFQ. The WVEDA reserves the right to cancel the RFQ in part or in its entirety. This solicitation of SOQs in no way obligates the WVEDA to award a contract. The WVEDA makes no guarantees to any proposing firm until such time the WVEDA approves the negotiated contract. The WVEDA will provide information and assistance in this project where available. Procurement of said services shall be in accordance with 2 CFR 200.320 (d) (5) and West Virginia Code Chapter 5G. The WVEDA will afford full opportunity for minority business enterprises to submit a SOQ in response to this invitation and will not discriminate against any interested firm or individual on the grounds of race, creed, color, sex, age, handicap or national origin in the contract award.
FORMER CENTURY ALUMINUM1325 CENTURY ROADMILLWOOD, WV 25262
SITE LOCATION MAPTITLE:
0 1,000 2,000500Feet
DJDRAWN BY:
CHECKED BY:
PROJECT NUMBER:
DATE:MF
APPROVED: REVISED:SW
DES: FIGURE NUMBER1
04/08/2014
12/07/2021
Docu
ment
Path:
C:\G
IS D
ATA\
WV_D
evelo
ment_
Auth\
Fig1_
Site_
Loca
tion_
Map.m
xd
±1 inch = 2,000 feet
EDA-2021-141
Service Layer Credits: Topographic map provided by ESRI's ArcGIS Online USA TopoMaps service (Copyright:© 2013 National Geographic Society, i-cubed)U.S.G.S. Topographic Map is 7.5 - minute "Ravenswood" quadrangle.
SITE LOCATIONLONG: -81.824192
LAT: 38.93649
← OHIO RIVER
TITLE:
0 400 800200Feet
DJDRAWN BY:
CHECKED BY:
PROJECT NUMBER:
DATE:MF
APPROVED: REVISED:
DES: FIGURE NUMBER
12/7/2021
EDA-2021-141
2
SITE BOUNDARY MAPFORMER CENTURY ALUMINUM
1325 CENTURY ROADMILLWOOD, WV 25262
LegendSite Boundary
Docu
ment
Path:
C:\G
IS D
ATA\
WV_D
evelo
ment_
Auth\
Fig2_
Site_
Vicini
ty_Ma
p.mxd
±1 inch = 817 feet
Tax Parcel18-06-0002-0002-0000
292 Oak Carriage Drive, Lewisburg, West Virginia 24901 917 Canyon Road, Morgantown, West Virginia 26508
www.greenbrierenv.com
December 8, 2021
West Virginia Economic Development Authority 180 Association Drive Northgate Business Park Charleston, West Virginia 25311
Attention: Kris Warner Executive Director
Subject: Site Visit, Regulatory Agency Meeting, and File Review Summary Former Century Aluminum Century Road Millwood, Jackson County, West Virginia
Dear Mr. Warner:
The purpose of this correspondence is to provide an overview of the environmental conditions at the site based on the site visit completed by Greenbrier Environmental Group, Inc. (GEG) on August 5, 2021, meeting with West Virginia Department of Environmental Protection (WVDEP) staff on October 15, 2021, and our review of available files.
Scope of Work
The following scope of work was completed by GEG.
Site Visit – August 5, 2021
GEG completed a site visit on August 5, 2021 to tour the site, meet with West Virginia Economic Development Authority (WVEDA) staff and WVDEP, and obtain information regarding the location and nature of the environmental issues at the site. A summary of the site visit was prepared by John Meeks with the WVDEP Office of Environmental Remediation (OER). The summary lists environmental issues observed and potential options to address each. Refer to Attachment I – WVDEP OER Site Visit Summary for a copy of the summary letter prepared by Mr. Meeks. Photographs taken during the site visit are included to this correspondence as Attachment II – Photographic Documentation.
Regulatory Agency Meeting – October 15, 2021
GEG met with WVEDA staff and representatives from the WVDEP to discuss the known environmental issues at the site and potential short and long-term compliance and remediation options. The WVDEP recommended
Site Visit, Regulatory Agency Meeting, and File Review Summary Former Century Aluminum Century Road Millwood, Jackson County, West Virginia
Page 2
addressing compliance issues immediately and then remediation of the site. WVDEP also recommended that compliance and remediation of any areas that drain to the Ohio River should be dealt with first. The following WVDEP staff were present at the meeting on October 15, 2021:
Jeffrey Cavender, Aboveground Storage Tank (AST)/Underground Storage Tank (UST) Section Joe Sizemore, Environmental Enforcement/Hazardous Waste John Meeks, OER Jesse Adkins, Division of Air Quality Jacob Rhodes, Asbestos Inspector-In-Training Jeff Hedgecock, Division of Air Quality/Asbestos John Killion, Hazardous Waste Inspector Supervisor Brad Wright, Water and Solid Waste Inspector Ryan Harbison, Waste Inspector
The following environmental issues were discussed:
AST Compliance WVDEP indicated the WVEDA needs to be listed as the owner of the ASTs at the site. The ASTs would need brought into compliance within 30 days after the transfer of ownership to WVEDA. The ASTs would need to be closed by August 1, 2023. There are Level I and Level II ASTs at the site, which means that a release from the ASTs has the potential to impact a downstream water intake or source water protection area. One leaking AST at the site was discussed and should be closed as soon as possible. WVDEP recommended the West Virginia Bureau for Risk Insurance Management (BRIM) for AST insurance.
Unsatisfactory Compliance Evaluation Inspection, WV/NPDES Permit Number WV0000779 WVDEP issued a Report of Compliance Evaluation Inspection for WV/NPDES Permit Number WV000079 on May 6, 2021. The report listed several unsatisfactory environmental conditions. Refer to Attachment III - Compliance Evaluation Inspection, WV/NPDES Permit Number WV0000779 (May 6, 2021) for a listing of the unsatisfactory environmental conditions that must be corrected at the site that were included in the Compliance Evaluation Report dated May 6, 2021. The WVDEP discussed the requirement to correct each unsatisfactory environmental condition.
Violation No. W21-18-001-RTH
WVDEP issued a Notice of Violation (NOV) for Violation No. W21-18-001-RTH on May 6, 2021. The NOV cited Applied Partners, Inc (WVEDA) for an unpermitted discharge from the roadbed constructed with contaminated demolition material located at the northern portion of the facility discharging into the Ohio River. Refer to Attachment IV – WVDEP Notice of Violations for a copy of the NOV for Violation No. W21-18-001-RTH dated May 6, 2021.
The WVDEP indicated that excavation and temporary covered storage of the contaminated material (cryolite) used to construct the roadway may be acceptable with coordination of the WVDEP.
Violation No. W21-18-002-RTH
WVDEP issued a NOV for Violation No. W21-18-002-RTH on May 6, 2021. The NOV cited Applied Partners, Inc (WVEDA) for the following violations of WV/NPDES Permit Number WV0000779:
Site Visit, Regulatory Agency Meeting, and File Review Summary Former Century Aluminum Century Road Millwood, Jackson County, West Virginia
Page 3
o Used mineral oil leaking from an AST located on the southeastern portion of the facility. The
leaking mineral oil was contaminating the soil within the mineral oil AST secondary containment area.
o Stained pavement and soil from previous spill adjacent to tote containing molasses. o Petroleum contaminated soil from previous spill adjacent 4,000-gallon diesel tank. o Tote containing used oil adjacent to the Carbon Press AST's leaking and contaminating the
adjacent soil. o Discharge associated from removed waste material from the demolition of the facility that had been
used to create a roadbed used for offloading pipe from train cars onto waiting trucks. The stormwater runoff from this area was discharging into the Ohio River creating an unpermitted Outfall.
The WVDEP indicated that excavation and temporary covered storage of the contaminated material (cryolite) used to construct the roadway may be acceptable with coordination of the WVDEP.
Refer to Attachment IV – WVDEP Notice of Violations for a copy of the NOV for Violation No. W21-18-002-RTH dated May 6, 2021.
Violation No. W21-18-003-RTH
WVDEP issued a NOV for Violation No. W21-18-003-RTH on May 6, 2021. The NOV cited Applied Partners, Inc (WVEDA) for exceeding the effluent limits at permitted Outfall 003 and 004. It was discussed that addressing the violations listed in Violation Number W21-18-002-RTH will likely reduce contaminant levels in the effluent samples. Refer to Attachment IV – WVDEP Notice of Violations for a copy of the NOV for Violation No. W21-18-003-RTH dated May 6, 2021.
Violation No. W21-18-004-RTH
WVDEP issued a NOV for Violation No. W21-18-004-RTH on May 6, 2021. The NOV cited Applied Partners, Inc (WVEDA) for drums containing material that have the potential to contaminate groundwater and required proper storage so that spills and leaks are contained. Addressing the violations includes several drums and other storage containers at the site that need to be characterized (hazardous versus non-hazardous) and properly disposed of. Refer to Attachment IV – WVDEP Notice of Violations for a copy of the NOV for Violation No. W21-18-004-RTH dated May 6, 2021.
Additional NOVs have been issued to the site, but were not discussed during the meeting with WVDEP on October 15, 2021.
Notice of Violation No. 2105-590
Applied Partners, Inc. was issued NOV# 1909-599 after a September 30, 2019 Focused Compliance Inspection. A follow-up inspection was completed on May 6, 2021. WVDEP noted that the mineral tanks at the site are continuing to leak the contents into the secondary containment. There was also no evidence that the containment was holding the material, as no pooling water or oil has been observed by inspectors during the inspections. Several other hazardous was violations were also noted. Refer to Attachment IV – WVDEP Notice of Violations for a copy of the NOV for NOV No. 2105-590 dated May 19, 2021.
Site Visit, Regulatory Agency Meeting, and File Review Summary Former Century Aluminum Century Road Millwood, Jackson County, West Virginia
Page 4
On-Site Waste Management
The WVDEP mentioned a ½-acre exemption for burying debris waste. The WVDEP recommended discussing the burying of fire brick with WVDEP’s Solid Waste Permitting Supervisor, John Lockhart, as a Class D landfill permit may be required. The potential of low-level radiation emanating from the fire brick was discussed, but an NOV has not been issued by the WVDEP for radiation exceedances. WVDEP recommended discussing the radiation concern with Michelle Cochran of the West Virginia Division of Health and Human Resources (DHHR). WVDEP agreed that permitting of an on-site hazardous waste landfill at the site to store cyrolite is an option, but they advised against it due to the permitting and long-term monitoring requirements.
Resource Conservation and Recovery Act (RCRA) Corrective Action WVDEP recommended discussing the status of the RCRA Corrective Action with the WVDEP Division of Water and Waste Management. On December 1, 2021, GEG contacted WVDEP OER to obtain a copy of the Environmental Covenant executed between Century Aluminum of West Virginia, Inc. and the WVDEP on December 2, 2016. The Environmental Covenant limits use of a portion of the property and is the result of RCRA Corrective Action at the site. Refer to Attachment V – Environmental Covenant (12/2/2016).
File Review
GEG submitted a Freedom of Information Act (FOIA) request to the WVDEP on October 4, 2021 to obtain all WVDEP files available for the site. The following responses were received by GEG from the WVDEP:
10/5/2021 – WVDEP Division of Air Quality responded by directing GEG to WVDEP’s electronic document management system located at https://documents.dep.wv.gov/appxtender. The latest WVDEP Division of Air Quality Inspection Report is dated August 1, 2018. The inspection Report is included as Attachment VI – WVDEP Division of Air Quality Inspection Report.
10/5/2021 – WVDEP Division of Air Quality/Asbestos responded by directing GEG to the WVDEP Electronic Submittal System (ESS) and https://dep.wv.gov/daq/CandE/Pages/AsbestosRemovalandDemolition.aspx to obtain demolition notifications. GEG downloaded the demolition notifications associated with the site on November 8, 2021. Refer to Attachment VII – WVDEP Asbestos Notifications for a copy of the notifications downloaded by GEG.
10/6/2021 – WVDEP UST Program responded indicating that no USTs are registered at the site. 10/18/2021 – WVDEP Environmental Enforcement responded by directing GEG to the WVDEP’s public
FOIA website located at www.dep.wv.gov. 10/18/2021 – WVDEP AST/Tanks Corrective Action Program responded by providing a spreadsheet
listing all ASTs owned by Constellium Rolled Products. GEG obtained the list of ASTs owned by Applied Partners, Inc. from the WVDEP website on October 16, 2021. GEG has been working with WVEDA and WVDEP to transfer ownership of the ASTs from Applied Partners, Inc. to WVEDA.
GEG reviewed the documentation obtained from the FOIA request and other documentation sent by WVEDA. Recommendations GEG recommends the development of a written plan of action to address all violations and unsatisfactory environmental conditions at the site. GEG recommends development of the written plan of action by a demolition and remediation contractor that is experienced in and capable of completing and/or managing all of the tasks necessary to ready the site for redevelop, as well as address all violations and unsatisfactory environmental conditions at the site. The plan of action should be developed in coordination with WVEDA. GEG can assist
Site Visit, Regulatory Agency Meeting, and File Review Summary Former Century Aluminum Century Road Millwood, Jackson County, West Virginia
Page 5
WVEDA with review of the plan and development of an effective and efficient pathway to remediation and redevelopment of the site. In the interim, GEG recommends completion of the following administrative tasks, which will result in resolution of some of the NOVs issued by the WVDEP:
Transfer of WV/NPDES Permit Number WV0000779 to WVEDA; Transfer of ownership of ASTs at the site to WVEDA; Transfer of the waste generator identification number to WVEDA;
Please contact me directly at (304) 646-7616 or via email to [email protected] with any questions regarding the correspondence or attachments. Sincerely, Greenbrier Environmental Group, Inc. _______________________________ Matthew A. Ford, LRS President Enclosures
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 1 of 13
Date Taken: August 5, 2021 Photographer: Matthew Ford, LRS Description: Unlabeled 5-gallon buckets (contain fire brick paste/morter)
Date Taken: August 5, 2021 Photographer: Matthew Ford, LRS Description: Improperly stored waste carbon
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 2 of 13
Date Taken: August 5, 2021 Photographer: Matthew Ford, LRS Description: ASTs containing pitch
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: ASTs and demolition debris
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 3 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: ASTs, stack, and demolition debris
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Tote containing used oil adjacent to carbon press ASTs. Note contaminated soil.
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 4 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Bake pits filled with fire prick
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Fire brick in the bake pits
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 5 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Compression pit with oil/water
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Compression pit with oil/water
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 6 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Rail spur and railcards. Roadway reportedly constructed suing cryolite that is leaching to an
unpermitted stormwater outlet.
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Railcar reportedly containing pitch.
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 7 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Aboveground storage tank containing diesel fuel
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Aboveground storage tanks containing diesel fuel
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 8 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Groundwater monitoring well associated with the RCRA corrective action.
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Building partially filled with cryolite waste
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 9 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Building partially filled with cryolite waste
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: 55-gallon drums and other containers in maintenance building
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 10 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: 55-gallon drums, totes, and other containers in maintenance building
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: 55-gallon drums, totes, and other containers in maintenance building
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 11 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Demolition debris
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Demolition debris
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 12 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Demolition debris
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Demolition debris
Photo Documentation – Site Visit Former Century Aluminum Millwood, Jackson County, West Virginia
Page 13 of 13
Date Taken: August 6, 2021 Photographer: Matthew Ford, LRS Description: Demolition debris including rectifiers that reportedly contain asbestos containing material
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
Dry Wall
1" Domestic Water Line
12"x12" Tan Floor Tile Assumed 5
12"x12" Black Floor Tile Assumed 5
01 Fibrous Glass 7-9%, Non-Fibrous 89-91%, Gray, Insulation
None Detected
Boiler Room, North Wall, Steam Heater Piping
02 Mineral Wool 9-11% Non-Fibrous 89-91%, Gray, Insulation
None Detected
Boiler Room, North Wall, Steam Heater Piping
66BH-01 RP-32 Arc Furnace Filter NAD N14+10EA -30 Up 4 Done-RAJ
66BH-02 RP-32 1/4 Shield Insulation NAD N12+5 WJ+60 Up 1 Done-RAJ
66BH-03 RP-32 Roller Insulation NAD N11 WJ Up 0 Done-RAJ
RP-32 12"x12" Floor Tile, Black Assumed 5 Done-RAJ
B65H-01 RP-32 Super Structure Insulators NAD SEE MAP Done-RAJ
B65H-02 RP-32 2'x4' Drop Ceiling NAD Lunch Room Done-RAJ
BCH-01BCH-02BCH-03
RP-29RP-29RP-29
Pipe Insulation NAD Boiler Room Boiler Room Boiler Room
Done-RAJ
BCH-04 BCH-05BCH-06
RP-29RP-29RP-29
Pipe Insulation NAD Boiler Room Boiler Room Boiler Room
Done-RAJ
BCH-07 BCH-08 BCH-09
RP-29RP-29RP-29
Pipe Insulation NAD Boiler Room Boiler Room Boiler Room
Done-RAJ
BCH-10 BCH-11BCH-12
RP-29RP-29RP-29
Pipe Insulation NAD Boiler Room Boiler Room Boiler Room
Done-RAJ
BCH-13 BCH-14 BCH-15
RP-29RP-29RP-29
Pipe Insulation NAD Boiler #4 Up 0 Boiler #4 Up 4 Boiler #4 Up 1
Done-RAJ
BCH-16BCH-17 BCH-18
RP-29RP-29RP-29
Pipe Insulation NAD Boiler Room Up 4 Boiler Room Up 7 Boiler Room Up 1
Done-RAJ
BCH-19 RP-29 Boiler Mortar NAD Boiler #1 + 2 Done-RAJ
BCH-20 BCH-21 BCH-22
RP-29RP-29RP-29
Pipe Insulation, 18" Steam Line
NAD 2nd Flr. Boiler Room2nd Flr. Boiler Room 2nd Flr. Boiler Room
Done-RAJ
BCH-23 BCH-24 BCH-25
RP-29RP-29RP-29
Pipe Insulation, 6" Steam Line
NAD 2nd Flr. Boiler Room2nd Flr. Boiler Room 2nd Flr. Boiler Room
Done-RAJ
BCH-26 BCH-27 BCH-28
RP-29RP-29RP-29
Pipe Insulation, Domestic Water
NAD Comp. Rm. + 3 Comp. Rm. +12 Comp. Rm. +12
Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
BCH-29 BCH-30 BCH-31
RP-29RP-29RP-29
Pipe Insulation, 2"Steam Line
NAD Compressor Rm. Compressor Rm. Compressor Rm.
Done-RAJ
BCH-32BCH-33BCH-34
RP-29RP-29RP-29
Pipe InsulationCondensate Line
NAD Compressor Rm. +8Compressor Rm. +8Comp. Rm. +12
Done-RAJ
BCH-35 RP-29 Rope Gasket, 3/8" NAD SE End Bldg. Cabinet Done-RAJ
BCH-36 RP-29 Rope Gasket, small black NAD Marked Cabinet Done-RAJ
BCH-37 RP-29 Rope Packing NAD Compressor Room Done-RAJ
BCH-38 Not Found 20ft.
RP-29 Rope Packing, small white 53% Chrysotile
Compressor Cabinet 2 Done-RAJ
BCH-39 RP-29 Rope Packing, 3/8" gray 53% Chrysotile
Marked Cabinet 2 Done-RAJ
BCH-40 RP-29 Rope Packing, 1/4" dark gray
NAD Marked Cabinet Done-RAJ
BCH-41 RP-29 Rope Packing, 1/2" gray NAD Marked Cabinet Done-RAJ
BCH-42 RP-29 Rope Packing, 1/8" dark gray
NAD Cabinet Done-RAJ
BCH-43BCH-44 BCH-45
RP-30 RP-30 RP-30
Pipe Insulation NAD S. Side Bldg. +15S. Side Bldg. +15S. Side Bldg. +15
Done-RAJ
BCH-46BCH-47 BCH-48
RP-30 RP-30 RP-30
Pipe Insulation, large condensate line
35% Chrysotile
S. Side Bldg. +15 S. Side Bldg. +15 S. Side Bldg. +8
2 Done-RAJ
BCH-49 BCH-50 BCH-51
RP-30 RP-30 RP-30
Pipe Insulation, small condensate line
NAD S. Side Bldg. +15S. Side Bldg. +15S. Side Bldg. +15
Done-RAJ
BCH-52 BCH-53BCH-54
RP-30 RP-30 RP-30
Pipe Insulation NAD Boiler #4 Boiler #2 Boiler #1
Done-RAJ
RP-30 Mud Joints, 2" Steam Line (1)
Assumed 7 Done-RAJ
RP-30 Mud Joints, Big (1) Assumed 7 Done-RAJ
RP-30 Mud Joints (2) Assumed 5 Done-RAJ
RP-30 Mud Joints, Condensate Line (2)
Assumed 4 Done-RAJ
RP-30 Mud Joints, Big (2) Assumed 4 Done-RAJ
RP-30 Mud Joints, Boiler Water Line (4)
Assumed 4 Done-RAJ
RP-30 Mud Joints, 6" Steam Line Assumed 2 Done-RAJ
RP-30 Mud Joints, 18' Steam Line Assumed 2 Done-RAJ
RP-30 Mud Joints, (12) Assumed 2 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
RP-30 Mud Joints, 18" Steam Line Assumed 2 Done-RAJ
RP-30 Mud Joints, Condensate Line (32)
Assumed 1 Done-RAJ
RP-30 Mud Joints, 2" Steam Line (23)
Assumed 1 Done-RAJ
RP-30 Mud Joints, Boiler Water Line, (2)
Assumed 1 Done-RAJ
BSH-01 RP-28 2'x4' Drop Ceiling Tile NAD Lunch Room Done-RAJ
RP-28 12"x12" Floor Tile Assumed 1 Done-RAJ
C212 Non-Fibrous 100%, Black, Top Layer Floor Tile
None Detected
Pot Room Canteen/Ice Area
C212-A Non-Fibrous 91-93%, Green/Black, Bottom Layer of Floor Tile & Mastic
Chrysotile7-9%
Pot Room Canteen/Ice Area
C213-1 Synthetics 9-11% Non-Fibrous 89-91%, Black/White, Insulation
None Detected
Liquid Pitch Rail Car Steam Pipe Debris
C213-2 Synthetics 9-11% Non-Fibrous 89-91%, White, Insulation
None Detected
Liquid Pitch Rail Car Steam Pipe Debris
CBH-01CBH-02CBH-03
RP-10 RP-10 RP-10
Duct Insulation on Fan Dampers
3% Chrysotile
G12 0/+39/5G11 +3/+36/0G10 -6/+36/0
5 Done-RAJ
CBH-04CBH-05CBH-06
RP-10RP-12RP-12
Round Duct Insulation 5% Chrysotile
G12 +12/+40/40G19 +28/-12/15E19 +36/+8/25
2 Done-RAJ
CBH-07 CBH-08 CBH-09
RP-10 RP-10 RP-10
Bag House Insulation 5% Chrysotile
G19 +42/+6/50G19 +34/+6/40G19 +36/+8/25
5 Done-RAJ
CBH-10 CBH-11 CBH-12
RP-12 RP-12 RP-12
Square Duct Insulation NAD G19 +18/-28/7G19 +3/-30/4F19 -2/-30/2
Done-RAJ
CBH-13CBH-14CBH-15
RP-10 RP-10 RP-10
Pipe Joint Insulation, 7/8" NAD G18 +36/-2/5G18 +2/-2/8G18 +2/-2/8
Done-RAJ
CBH-16 CBH-17 CBH-18
RP-10 RP-10 RP-10
Pipe Insulation, 7/8" NAD G18 +2/-2/11G18 +36/-2/65G18 +36/-2/12
Done-RAJ
CBH-19 CBH-20 CBH-21
RP-10 RP-10 RP-10
2" Conic Cooler Mud Joints NAD G17 +30/+8/5G17 +30/+2/65G17 +42/+2/40
Done-RAJ
CBH-22 CBH-23 CBH-24
RP-10 RP-10 RP-10
2" Conic Cooler Pipe Insulation
NAD G17 +30/+2/33G17 +36/+2/40G17 +42/+2/33
Done-RAJ
CBH-25 RP-10 Old Rope Gasket, Furnace NAD G8 0/-2/0 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
CBH-26 RP-10 Gasket Material, Furnace NAD G14 0/0/0 Done-RAJ
CBH-27 CBH-28 CBH-29
RP-10 RP-10 RP-10
Pipe Insulation, 2 1/4" NAD G18 +9/+9/5G18 0/0/11G18 0/0/28
Done-RAJ
CBH-30 CBH-31 CBH-32
RP-10 RP-10 RP-10
Pipe Joint Insulation, 2 1/2" NAD G18 0/0/10F18 0/0/30G18 0/0/28
Done-RAJ
CBH-33 CBH-34 CBH-35
RP-9 RP-9 RP-9
2'x4' Drop Ceiling Tile NAD F19 -6/+6/8F19 -6/+6/8F19 -6/+6/8
Done-RAJ
CBH-36 CBH-37 CBH-38
RP-9 RP-9 RP-9
2'x4' Drop Ceiling Tile NAD F9 -12/-12/10F9 -12/-6/10F10 -2/+10/10
Done-RAJ
CBH-39 RP-9 Rubber Duct Wrap NAD F9 -6/-4/0 Done-RAJ
CBH-40 CBH-41 CBH-42
RP-9 RP-9 RP-9
2'x4' Ceiling Tile NAD E9 +21/-10/0E9 +20/-10/0E9 +30/-10/0
Done-RAJ
CBH-43 CBH-44 CBH-45
RP-9 RP-9 RP-9
2'x4' Ceiling Tile NAD E9 +30/-10/0E9 +30/-10/0E9 +30/-10/0
Done-RAJ
CBH-46 CBH-47 CBH-48
RP-9 RP-9 RP-9
Stack Spray Line Insulation, 3 1/2"
NAD E19 +18/+1/25E19 +14/0/1E19 +6/+1/1
Done-RAJ
CBH-49 CBH-50 CBH-51
RP-9 RP-9 RP-9
Stack Spray Line Mud Joints, 3 1/2"
NAD E19 +18/+1/4E19 +16/+1/1E19 +6/0/1
Done-RAJ
CBH-52 CBH-53 CBH-54
RP-9 RP-9 RP-9
Pipe Insulation, 1" NAD E19 0/+21/0E19 0/+12/0E19 0/+1/0
Done-RAJ
CBH-55 CBH-56 CBH-57
RP-9 RP-9 RP-9
Fiber Board Wall NAD E19 +18/0/4E19 +3/0/3E19 +23/0/5
Done-RAJ
CBH-58 CBH-59 CBH-60
RP-9 RP-9 RP-9
Domestic Water Line, 3" NAD D18 +12/-4/30D13 +24/+12/30D13 +22/+12/30
Done-RAJ
CBH-61 CBH-62 CBH-63
RP-9 RP-9 RP-9
Domestic Water Line Joints, 3"
NAD D18 0/-4/30D18 +24/-4/30D18 -12/-4/30
Done-RAJ
CBH-64 CBH-65 CBH-66
RP-9 RP-9 RP-9
Domestic Water Line, 2 1/2"
NAD E18 +58/0/18E18 +30/0/30E18 -3/0/30
Done-RAJ
CBH-67 CBH-68 CBH-69
RP-9 RP-9 RP-9
Pipe Insulation, 2 1/2" NAD D18 +5/0/30D18 +12/0/30 D18 +18/0/30
Done-RAJ
CBH-70 CBH-71 CBH-72
RP-9 RP-9 RP-9
Pipe Insulation, 1" NAD E19 0/-14/20E19 0/+24/20 E19 0/+39/20
Done-RAJ
CBH-73 CBH-74 CBH-75
RP-9 RP-9 RP-9
Steam Line Insulation, 2 1/4"
NAD D9 0/0/25D9 +34/0/30E9 0/-9/25
Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
CBH-76 CBH-77 CBH-78
RP-9 RP-9 RP-9
Domestic Water Line Insulation, 2 1/2"
NAD D9 0/0/25D9 +34/0/30 E9 0/0/25
Done-RAJ
CBH-79CBH-80 CBH-81
RP-9 RP-9 RP-9
Domestic Water Line Insulation, 2 1/2"
NAD D8 +24/0/30D5 +24/+3/30D4 +24/+8/30
Done-RAJ
CBH-82 RP-9 Domestic Water Line Insulation, 2 1/2"
NAD D5 +24/+5/30 Done-RAJ
CBH-83CBH-84CBH-85
RP-9 RP-9 RP-9
Pipe Insulation, 2 1/2" 5% Chrysotile
E2 +21/0/20E2 +50/0/20E2 +35/0/20
5 Done-RAJ
CBH-86CBH-87CBH-88
RP-9RP-9RP-9
Pipe Insulation, 2 1/2" NAD D3 +13/+3/30D3 +50/+3/30 F3 0/+3/30
Done-RAJ
CBH-89CBH-90CBH-91
RP-9RP-9RP-9
Pipe Joint Insulation, 2 1/2" 5% Chrysotile
E2 +2/+3/20E2 0/+3/28E2 -1/+3/30
7 Done-RAJ
CBH-92CBH-93CBH-94
RP-8RP-8RP-8
Pipe Insulation, 1" NAD C9 +11/-5/10C9 +9/-8/10 C9 +9/+1/10
Done-RAJ
CBH-95CBH-96
RP-8RP-8
Pipe Joint Insulation, 1" NAD C9 +9/-10/10C9 +9/-10/10
Done-RAJ
CBH-97CBH-98CBH-99
RP-8RP-8RP-8
2'x4' Ceiling Tile NAD C9 +14/-19/8C9 +12/-5/8 C9 +11/-11/8
Done-RAJ
CBH-100CBH-101CBH-102
RP-8 RP-8 RP-8
2'x4' Ceiling Tile NAD C9 +29/-8/8 C9 +22/-16/8C9 +42/-12/8
Done-RAJ
CBH-103 CBH-104 CBH-105
RP-8 RP-8 RP-8
2'x4' Ceiling Tile NAD C9 +19/-19/8.5C9 +8/-24/8.5 C9+36/-24/8.5
Done-RAJ
CBH-106 CBH-107 CBH-108
RP-8 RP-8 RP-8
Pipe Insulation, 2 1/2" 10%Chrysotile,20%Amosite
A19 -30/+3/30 A19 -6/+3/30 A19 0/+6/30
5 Done-RAJ
CBH-109 CBH-110 CBH-111
RP-8 RP-8 RP-8
Steam Line Insulation, 6 1/2"
NAD A19 -14/+5/28B19 0/+5/28B18 +1/-10/30
Done-RAJ
CBH-112 CBH-113CBH-114
RP-8 RP-8 RP-8
Domestic Water Line Insulation
NAD A19 -27/+12/28 B19 +1/+14/27 B18 +46/-3/30
Done-RAJ
CBH-115 CBH-116CBH-117
RP-8 RP-8 RP-8
Pipe Insulation, 3 1/4" NAD A19 -12/+14/28B19 -1/+15/27B18 -1/+8/27
Done-RAJ
CBH-118 RP-8 Steam Line Insulation, 6 1/2"
15% Chrysotile
A19 -5/+6/28 5 Done-RAJ
CBH-119 CBH-120 CBH-121
RP-8 RP-8 RP-8
Domestic Water Line Joints
NAD B19 +2/+10/27B18 -12/-4/27B18 +3/-14/30
Done-RAJ
CBH-122CBH-123CBH-124
RP-8 RP-8 RP-8
Pipe Insulation, 4 1/4" NAD C19 -2/+2/28C18 -8/+3/34C8 -6/+9/0
Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
CBH-125 CBH-126 CBH-127
RP-8 RP-8 RP-8
Mud Joints, 1" 2% Chrysotile
D2 -5/0/20D2 -5/-1/16 D2 -5/-9/5
7 Done-RAJ
CBH-128 CBH-129CBH-130
RP-8 RP-8 RP-8
Pipe Insulation, 1" NAD D2 -5/0/21D2 -5/-1/16D2 -5/-9/5
Done-RAJ
CBH-131CBH-132 CBH-133
RP-8 RP-8 RP-8
Pipe Insulation, 1 1/2" 25% Amosite
D1 -2/-6/20D1 -2/0/16D1-2/0/6
5 Done-RAJ
CBH-134 CBH-135 CBH-136
RP-8 RP-8 RP-8
Duct Wrap NAD C9 +15/-12/8C9 +14/-10/8 C9 +13/-6/8
Done-RAJ
CBH-137 CBH-138 CBH-139
RP-8 RP-8 RP-8
Domestic Water Line Insulation
NAD C19 +9/0/3D18 0/-4/27D18 -6/-4/30
Done-RAJ
CBH-140 CBH-141 CBH-142
RP-8 RP-8 RP-8
Domestic Water Line Joints
NAD C19 +9/0/3D18 0/-4/29 D18 0/-10/20
Done-RAJ
CBH-143 CBH-144 CBH-145
RP-8 RP-8 RP-8
Pipe Insulation, 2" NAD C18 +2/-1/20C18 0/-1/28C18 -2/-1/30
Done-RAJ
CBH-146 CBH-147CBH-148
RP-8 RP-8 RP-8
Mud Joints, 2" 10% Chrysotile
C18 -2/-1/30C18 -1/-1/30C18 0/-1/28
5 Done-RAJ
CBH-149 RP-8 Pipe Insulation, 3" NAD C9 0/-1/10 Done-RAJ
CBH-150 CBH-151 CBH-152
RP-8 RP-8 RP-8
2'x4' Drop Ceiling Tile NAD C19 -6/20/8C19 -26/32/8 C19 -6/-32/8
Done-RAJ
RP-8 12"x12" Floor Tile, Black with White; Building 51
Assumed C19 4 Done-RAJ
RP-8 12"x12" Floor Tile, Control Room
Assumed C19 4 Done-RAJ
RP-8 12"x12" Floor Tile, Black with White; Building 52
Assumed C19 1 Done-RAJ
RP-8 12"x12" Floor Tile, Building 59
Assumed C19 1 Done-RAJ
RP-8 12"x12" Gray Marbled Floor Tile, Substation
Assumed C19 1 Done-RAJ
RP-8 12"x12" Floor Tile, Building 59-lunch room
Assumed C19 1 Done-RAJ
CMG-01 RP-31 2'x4' Ceiling Tile NAD Lunch Room Done-RAJ
CMG-02 RP-31 Gasket Material NAD B2 -2/+15/4 Done-RAJ
CMG-03CMG-04CMG-05
RP-31RP-31RP-31
Pipe Insulation, 16" NAD A1 +12/2/14A1 +24/2/14A2 -5/+2/14
Done-RAJ
CMG-06 RP-31 Pipe Insulation, 2" NAD A2 -20/+2/18 Done-RAJ
CMG-07 RP-31 Pipe Insulation, 3" 20% Chrysotile
A2 -4/+2/18 5 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
CMG-08CMG-09
RP-31RP-31
Pipe Insulation, 2" NAD C1 0/-1/14G1 0/0/16
Done-RAJ
CMG-10 RP-31 Caulking NAD H1 0/+2/5 Done-RAJ
CMG-11 RP-31 4" Wrap NAD M1 +10/-3/4 Done-RAJ
CMG-12CMG-13
RP-31RP-31
Pipe Insulation, 3" 20% Chrysotile
N2 0/+4/14N2 0/+8/24
5 Done-RAJ
CMG-14 RP-31 C100 Preformed Sheeting NAD O1 -17/+4/4 Done-RAJ
CMG-15 RP-31 Preformed Grating NAD Q2 -2/-2/3 Done-RAJ
CMG-16 RP-31 Door Gasket to Kiln 98% Chrysotile
Q3 -20/-2/3 2 Done-RAJ
CMG-17 RP-31 Kiln Vent Cap Plate 65% Chrysotile
Q3 -20/0/3 2 Done-RAJ
CMG-18CMG-19CMG-20
RP-31RP-31RP-31
Pipe Insulation, 6" NAD Q3 0/+5/1Q3 0/+5/4 Q3 0/+5/6
Done-RAJ
CMO-01 RP-5 2'x4' Fissured Ceiling Tile NAD Supervisors Office Done-RAJ
CMO-02 RP-5 2'x4' Ceiling Tile NAD Tool Room Done-RAJ
CMO-03 RP-5 12"x12" Ceiling Tile, Spine Mounted
NAD Secretaries Office Done-RAJ
CMO-04 RP-5 Pot Shield NAD Storage Room Done-RAJ
CMO-05 RP-5 Contact Bars NAD Taylor-Dunn Control Bin Done-RAJ
CMO-06 RP-5 Board Separator NAD Storage Bin, 2nd Shelf Done-RAJ
CMO-07 RP-5 Electric Contact Board 7% Chrysotile
2nd Cabinet, 2nd Shelf 2 Done-RAJ couldn't find
CMO-08 RP-5 Radiator Hoses NAD Storage Room Done-RAJ
CMO-09 RP-5 Belt Hoses NAD Stock Room Wall Done-RAJ
CMO-10 RP-5 Packing Ring NAD Stock Room, Drawer 4 Done-RAJ
CMO-11 RP-5 O-Ring NAD Stock Room Done-RAJ
CMO-12 RP-5 Transmission Material NAD Stock Room Done-RAJ
CMO-13 RP-5 Fan Belt NAD Stock Room Done-RAJ
CMO-14 RP-5 Fuel Line Hose NAD Stock Room Done-RAJ
CMO-15 RP-5 Grey Rigid Gasket Material 45% Chrysotile
Stock Room 1 Done-RAJ couldn't find
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
CMO-16 RP-5 Grey Soft Gasket NAD Stock Room, R8 Cabinet Done-RAJ couldn't find
CMO-17 RP-5 Red Soft Gasket NAD Stock Room, R8 Cabinet Done-RAJ
CMO-18 RP-5 Inner Soft Metal Jacket Gasket
60% Chrysotile
Stock Room, 6th Shelf 2 Done-RAJ
CMO-19 RP-5 Flex Hose, 3" NAD Stock Room Done-RAJ
CMO-20 RP-5 Flex Hose, 2" NAD Stock Room Done-RAJ
CMO-21 RP-5 Paper/Metal Gasket NAD Stock Room Done-RAJ
CMO-22 RP-5 Red Rigid Gasket 70% Chrysotile
Stock Room 4 Done-RAJ couldn't find
CMO-23 RP-5 Silver Backed Gasket 15% Chrysotile
Stock Room 1 Done-RAJ couldn't find
CMO-24 RP-5 Core Gasket Material NAD Stock Room Done-RAJ
CMO-25 RP-5 Hose, 1" NAD Stock Room Done-RAJ
CMO-26 RP-5 Hose, 1/2" NAD Stock Room Done-RAJ
CMO-27 RP-5 Metal Gasket and Filter 40% Chrysotile
Stock Room 5 Done-RAJ couldn't find
CMO-28 RP-5 Tan Gasket Material 35% Chrysotile
Stock Room 1 Done-RAJ couldn't find
CMO-29 RP-5 Green Gasket Material NAD Stock Room Done-RAJ
RP-5 12"x12" Tan Floor Tile Assumed 5
RP-5 12"x12" Black Floor Tile Assumed 5
CPRO-1 Fibrous Glass 79-81%Non-Fibrous 19-21%Yellow, Insulation
None Detected
Hallway, DuctworkAbove Drop Ceiling
CPRO-2 Mineral Wool 74-76%Non-Fibrous 24-26%Tan, Mud
None Detected
Bathroom, Above Drop Ceiling, Mudded Fitting
CPRO-3 Mineral Wool 89-91%Non-Fibrous 9-11%White, Ceiling Tile
None Detected
Hallway, Above Drop Ceiling
CUG-01 RP-36 Dry Wall NAD SEE MAP Done-RAJ
CUG-02 RP-36 Dry Wall Tape Joint NAD SEE MAP Done-RAJ
GC-01GC-02GC-03
RP-13RP-13RP-13
Pipe Insulation NAD E1 0/+1/4E1 0/+3/4 E1 0+5/3
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-04GC-05GC-06
RP-13RP-13RP-13
Pipe Insulation, 3 1/2" NAD E2 +2/+6/6C2 +2/+14/6 C2 -2/-3/6
GC-07GC-08
RP-13RP-13
Pipe Joint Insulation 5% Chrysotile
C2 +2/-3/7B2 +2/+10/7
5 couldn't find
GC-09GC-10GC-11
RP-13RP-13RP-13
Pipe Insulation, 3 1/2" NAD B2 -2/+6/6C2 -2/+6/6D2 -2/+2/6
GC-12GC-13GC-14
RP-13RP-13RP-13
Pipe Insulation, 4" 3% Chrysotile2% Amosite
C2 -2/+4/7C2 +2/+4/7C2 +4/+6/7
7
GC-15GC-16GC-17
RP-13RP-13RP-13
Pipe Insulation NAD C2 -3/+4/6C2 +3/+8/6C2 0/+6/8
GC-18GC-19GC-20
RP-13RP-13RP-13
Pipe Insulation, 1" NAD E3 +2/+11/6E3 +2/+11/2E3 0/7/8
GC-21 RP-13 Pipe Insulation, 1" 10% Chrysotile
E3 -1/+7/8 7 couldn't find
GC-22GC-23GC-24
RP-13RP-13RP-13
Pipe Insulation, 4" 10% Chrysotile
E3 0/+6/7E3 -2/+7/7E3 -4/+7/9
5 couldn't find
GC-25GC-26GC-27
RP-13RP-13RP-13
Pipe Insulation, 8" 5% Chrysotile15% Amosite
E3 -1/+12/6E3 +2/+2/8B3 +2/+4/8
7 couldn't find
GC-28GC-29GC-30GC-31
RP-13RP-13RP-13RP-13
Pipe Insulation, 8" NAD B3 +2/+12/7C3 +2/+6/7C3 +5/+4/8E3 +2/-4/8
GC-32 RP-13 Pipe Insulation, 8" 5% Chrysotile15% Amosite
C3 +1/+3/4 7 Abated/ Removed
GC-33 RP-13 Pipe Insulation, 3/4" NAD J1 -3/0/4
GC-34 RP-13 Pipe Insulation, 3/4" 3% Chrysotile20% Amosite
J1 11/-1/7 7 Abated/ Removed
GC-35 RP-14 Pipe Joint Insulation, 3/4" 10% Chrysotile
J1 -10/-1/2 7 Abated/ Removed
GC-36 RP-14 Pipe Insulation, 3/4" 3% Chrysotile20% Amosite
J1 11/-1/10 7 Abated/ Removed
GC-37 RP-14 Pipe Joint Insulation NAD J1 +5/-12/4
GC-38 RP-14 Pipe Insulation, 1 1/2" 15% Chrysotile
G1 0/+5/3 7 Abated/ Removed
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-39 RP-14 Pipe Insulation, 3/4" 3% Chrysotile20% Amosite
G2 4/5/10 7 Abated/ Removed
GC-40 RP-14 Pipe Insulation, 1 1/2" NAD G2 +5/0/10
GC-41GC-42GC-43
RP-13RP-13RP-13
Pipe Insulation, 1 1/2" NAD C9 0/-10/5C9 0/-10/2C9 0/-14/2
GC-44GC-45
RP-13RP-13
Pipe Joint Insulation, 1 1/2" 2% Chrysotile
D7 -4/+11/16D7 -4/+15/16
5
GC-46 RP-13 Pipe Insulation, 1" 2% Chrysotile
D7 -8/+14/18 2
GC-47 RP-13 Pipe Insulation, 1 1/4" NAD E8 +3/0/18
GC-48GC-49GC-50
RP-13RP-13RP-13
Pipe Insulation, 1 1/4" NAD E7 -5//-1/18E8 +2/-1/18E8 -8/-1/18
GC-51 RP-13 Pipe Insulation, 2" NAD E8 -4/-2/18
GC-52 RP-13 Pipe Insulation Mud Joint, 2"
15% Chrysotile
E9 +2/-2/18 2 Abated/ Removed
GC-53 RP-13 Pipe Insulation, 1 1/2" 10% Chrysotile
E9 +2/-2/18 5
GC-54 RP-13 Pipe Insulation, 1 1/2" NAD D9 +1/+3/18
GC-55GC-56
RP-13RP-13
Pipe Insulation Mud Joint, 1 1/2"
10% Chrysotile
D9 0/+5/18D9 +3/0/18
5 Abated/ Removed
GC-57 RP-13 Pipe Insulation, 1 1/2" NAD B9 +2/+6/18
GC-58 RP-13 Pipe Insulation Joint, 1 1/2" 2% Chrysotile
B9 +3/0/18 2 Abated/ Removed
GC-59 RP-13 VERIFY
GC-60GC-61
RP-13 RP-13
Pipe Insulation Mud Joint, 1"
3% Chrysotile
B9 +5/-1/22B9 +5/-4/22
2 Abated/ Removed
GC-62 RP-13 Pipe Insulation, 1" NAD B9 +5/-2/22
GC-63 RP-13 Pipe Insulation, 1 1/2" NAD B9 0/+1/18
GC-64 RP-13 Pipe Insulation Mud Joint, 1"
3% Chrysotile
B9 +1/-8/22 2 Abated/ Removed
GC-65GC-66
RP-13RP-13
Pipe Insulation, 1" NAD B9 +1/+10/22B9 +1/+15/22
GC-67GC-68GC-69
RP-13RP-13RP-13
Pipe Insulation, 1" NAD A9 +3/+2/22A9 +3/+10/22A9 +3/+15/22
GC-70 RP-13 Pipe Insulation, 1 1/4" NAD B8 0/-5/22
GC-71 RP-13 Pipe Joint Insulation, 1 1/4" 3% Chrysotile
B8 0/+8/22 5 Abated/ Removed
GC-72 RP-13 Pipe Insulation, 1 1/4" NAD B8 0/-10/22
GC-73 RP-13 Pipe Joint Insulation, 1 1/4" 3% Chrysotile
B8 0/+18/22 5 Abated/ Removed
GC-74 RP-13 Pipe Insulation Joint, 1 1/2" 2% Chrysotile
B8 +2/-1/18 2 Abated/ Removed
GC-75GC-76
RP-13RP-13
Pipe Insulation, 2" NAD B8 +15/+1/22B6 +15/+1/18
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-77 RP-13 Pipe Insulation Joint, 1 1/2" 2% Chrysotile
B15 0/-4/18 2 Abated/ Removed
GC-78 RP-13 Pipe Insulation, 2" NAD B5 0/+3/18
GC-79GC-80GC-81
RP-13RP-13RP-13
Block Insulation w/Cloth Cover
15% Chrysotile7% Amosite
U7 Exh.C8 +4/+12/4C8 +8/+14/4C8 +8/+12/4
7 Abated/ Removed
GC-82GC-83GC-84
RP-13RP-13RP-13
Air Duct Insulation 10% Chrysotile3% Amosite
C8 +3/12/10D9 -10/-4/12D9 -12/-6/14
2 Abated/ Removed
GC-85 RP-13 Air Duct NAD D8 +10/-2/16
GC-86GC-87GC-88
RP-13RP-13RP-13
Duct Wrap 10% Chrysotile
A4 -8/+5/3A4 -8/+5/4A4 -8/+5/5
5
GC-89 RP-13 1/2" Hose Insulation NAD A4 -12/+3/2
GC-90GC-91GC-92
RP-13RP-13RP-13
Mechanical Joint Vibration Material
NAD A4 -16/+2/3A4 -17/+3/2 A4 -16/+4/3
GC-93 RP-13 Pipe Insulation, 2" NAD E6 -8/+10/12
GC-94 RP-13 Mud Joint, 2" 15% Chrysotile
E8 -4/+10/12 5 Abated/ Removed
GC-95 RP-13 Pipe Insulation, 2" NAD E8 -2/+10/12
GC-96 VERIFY
GC-97 RP-14 Mud Joint, 1/2" 20% Chrysotile15% Amosite
A3 +1/0/4 7 Abated/ Removed
GC-98GC-99
RP-14RP-14
Pipe Insulation, 1/2" 20% Chrysotile25% Amosite
A3 -1/0/6A1 0/0/4
7 Abated/ Removed
GC-100GC-101
RP-14RP-14
Mud Joint, 1/2" 20% Chrysotile15% Amosite
A1 0/0/7A1 0/0/4
7 Abated/ Removed
GC-102 RP-14 Pipe Insulation, 1/2" 20% Chrysotile25% Amosite
C1 0/0/4 7 Abated/ Removed
GC-103GC-104GC-105
RP-14RP-14RP-14
Mixer Unit Blanket Insulation
NAD Unit 1 A2 -1/+6/5Unit 1 A2 +7/+10/4Unit +7/+6/5
GC-106GC-107GC-108
RP-14RP-14RP-14
Mixer Unit #9 Insulation NAD A2 +3/+5/6A2 +8/+5/9A2 +3/+10/4
GC-109GC-110GC-111
RP-14RP-14RP-14
Mixer Unit #2 Insulation NAD B2 -3/+3/4B2 -3/-2/3B2 -4/-4/3
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-112GC-113GC-114
RP-14RP-14RP-14
Mixer Unit #10 Insulation NAD B2 +4/+4/3B2 +5/-2/5B2 +5/+5/6
GC-115GC-116GC-117
RP-14RP-14RP-14
Mixer Unit #3 Insulation NAD C2 -4/-8/3C2 -4/-10/5C2 -4/-5/4
GC-118GC-119GC-120
RP-14RP-14RP-14
Mixer Unit #11 Insulation NAD C2 +5/-5/4C2 +4/-6/6C2 +5/-10/6
GC-121GC-122GC-123
RP-14RP-14RP-14
Mixer Unit #12 Insulation NAD C2 +4/-1/5C2 +5/+6/7C2 +4/+6/3
GC-124GC-125GC-126
RP-14RP-14RP-14
Mixer Unit #5 Insulation NAD D2 -2/+8/7D2 -4/+10/5D2 -4/+3/4
GC-127GC-128GC-129
RP-14RP-14RP-14
Mixer Unit #13 Insulation Blanket
NAD D2 +4/-8/4D2 +4/-2/7 D2 +3/-2/3
GC-130GC-131GC-132
RP-14RP-14RP-14
Mixer Unit #6 Insulation Blanket
NAD D2 -4/+2/6D2 -6/+2/3D2 -4/+8/4
GC-133GC-134GC-135
RP-14RP-14RP-14
Mixer Unit #14 Insulation Blanket
NAD D2 +3/+1/8D2 +3/+1/3D2 +3/+7/4
GC-136GC-137GC-138
RP-14RP-14RP-14
Mixer Unit #7 Insulation Blanket
NAD E2 -4/-10/3E2 -4/-10/8E2 -4/-1/6
GC-139GC-140GC-141
RP-14RP-14RP-14
Mixer Unit #15 Insulation Blanket
91% Chrysotile
E2 +4/-1/6E2 +4/-1/2 E2 +4/-7/4
2
GC-142 RP-14 Pipe Insulation, 1/2" 21% Chrysotile
E2 +3/-1/3 2 Abated/ Removed
GC-143GC-144GC-145
RP-14RP-14RP-14
Mixer Unit #8 Insulation NAD E2 -4/+2/7E2 -4/+2/3E2 -8/+8/4
GC-146GC-147GC-148
RP-14RP-14RP-14
Mixer Unit #16 Insulation 90% Chrysotile
E2 +3/+2/3E2 +3/+2/5E2 +3/+2/7
5
GC-149 RP-14 Pipe Insulation, 6" NAD F3 +1/+2/5
GC-150 RP-14 1/2" Hose Line Insulation NAD F2 0/-4/2
GC-151 RP-14 Pipe Insulation, 6" NAD B3 +3/+4/5
GC-152GC-153
RP-14RP-14
Mud Joint, 6" 5% Chrysotile
B2 +3/+4/8B7 -10/-12/11
2 Abated/ Removed
GC-154 RP-14 Pipe Insulation, 6" NAD B7 -10/-14/11
GC-155 RP-14 Mud Joint, 6" 5% Chrysotile
B8 +4/+1/11 2 Abated/ Removed
GC-156 RP-14 Pipe Insulation, 6" NAD B8 +4/0/11
GC-157 RP-14 Mud Joint, 3" 4% Chrysotile
B8 +1/+2/11 2 Abated/ Removed
GC-158 RP-14 Pipe Insulation, 3" NAD B8 +1/+2/11
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-159 RP-14 Mud Joint, 3" 4% Chrysotile
A7 -3/+1/11 2 Abated/ Removed
GC-160 RP-14 Pipe Insulation, 3" NAD A7 -3/+1/6
GC-161 RP-14 Mud Joint, 3" 4% Chrysotile
B9 +1/+1/11 2 Abated/ Removed
GC-162 RP-14 Pipe Insulation, 3" NAD B9 +2/+1/11
GC-163GC-164GC-165
RP-14RP-14RP-14
2'x4' Ceiling Tile NAD See MapSee MapSee Map
GC-166 GC-167 GC-168
RP-14RP-14RP-14
Press Board Ceiling NAD See MapSee MapSee Map
GC-170 RP-14 30" Air Duct Insulation NAD D7 -12/-2/22nd Floor
GC-171 RP-14 30" Air Duct Insulation 15% Chrysotile
D7 -12/-2/42nd Floor
5
GC-172GC-173GC-174
RP-14RP-14RP-14
Tank Insulation 2% Chrysotile
D8 +3/+1/7 D8 +2/+3/9D8+1/+1/9
5 Abated/ Removed
GC-175GC-176
RP-14RP-14
Pipe Insulation, 3/4" NAD D8 +2/0/5D8 +2/+1/3
GC-177 GC-178 GC-179
RP-14 RP-14 RP-14
Pipe Insulation, 1 1/2" NAD D8 -3/0/15D8 -11/0/15D9 +2/0/15
GC-180GC-181GC-182
RP-15RP-15 RP-15
Tank Insulation 65% Chrysotile
D7 -4/-11/3D7 -7/+8/4 D7 -4/+8/2
5 Abated/ Removed
GC-183 RP-14 Pipe Insulation, 3/4" NAD D8 +2/+2/5
GC-184 RP-15 30" Air Duct Insulation 15% Chrysotile
D7 -12/-2/4 3rd Floor 5
GC-185 RP-15 Vibration Joint NAD D9 +3/+3/8
GC-186 GC-187
RP-16 RP-16
30" Air Duct Insulation 20% Chrysotile
D7 -12/-4/4 4th Floor D7 -12/-4/2 4th Floor
5
GC-188 RP-16 30" Air Duct Insulation 15% Chrysotile
D7 -12/-3/6 5
GC-189 GC-190 GC-191
RP-16 RP-16 RP-16
Tank Insulation 20% Chrysotile
C8 +80/+10/5 C8 +8/+2/4 C8 +3/+5/5
2
GC-192 RP-16 Vibration Joint NAD E7 +5/-1/2
GC-193GC-194GC-195
RP-16 RP-16 RP-16
Chute Insulation 12% Chrysotile
E8 0/+5/7 E8 -10/+6/8 E9+2/+4/8
5
GC-196 GC-197 GC-198
RP-17 RP-17 RP-17
P2 Cyclone 12% Chrysotile
E8 +12/+7/6 E8 +7/+11/5E8 +12/+5/7
2
GC-199 GC-200 GC-201
RP-17 RP-17 RP-17
Bag House 10% Chrysotile
D8 +2/-7/5D8 -8/-7/6D8 -18/-7/4
2
GC-202 GC-203 GC-204
RP-17 RP-17 RP-17
Old Insulation 12% Chrysotile
D8 +1/-10/8 D8 -8/-10/9D8 +6/-14/5
5
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GC-205 RP-16 1 1/2" Fire Hose NAD E1 -5/0/4
GC-206 RP-15 Mud Joint, 1 1/2" 80% Chrysotile
3rd Floor CentralSee Map
5 Abated/ Removed
GC-207 RP-15 Pipe Insulation, 1 1/2" NAD 3rd Floor Central See Map
GC-208 Pipe Insulation NAD See Map
GC-209 Pipe Insulation, 2 1/2" NAD Lunch Room/See Map
GC-210 GC-211 GC-212
2'x4' Ceiling Tile NAD West Entry Control. Window W. Wall North Entry
RP-23 12"x12" Floor Tile, Black Assumed 2
RP-23 12"x12" Floor Tile, Black with white streaks
Assumed 5
GCCTGH-01GCCTGH-02GCCTGH-03
RP-36 RP-36 RP-36
Pipe Insulation, 4" NAD Listed on Map Listed on Map Listed on Map
Done-RAJ
GCCTGH-04 RP-36 Red Hose, 1 1/2" NAD Listed on Map Done-RAJ
GCCTGH-05 RP-36 Red Hose, 2" NAD Listed on Map Done-RAJ
GCCTGH-06GCCTGH-07GCCTGH-08
RP-36 RP-36 RP-36
Preformed Shroud NAD West Seam South West Base East Seam
Done-RAJ
GCCTG2-01GCCTG2-02 GCCTG2-03
RP-36 RP-36 RP-36
Pipe Insulation, 4" 15% Chrysotile
Listed on Map Listed on Map Listed on Map
7 Abated/ Removed
GCCTG2-04 GCCTG2-05 GCCTG2-06
RP-36 RP-36 RP-36
Fan Shroud NAD North Side East Side South Side
GCCTG2-07 GCCTG2-08 GCCTG2-09
RP-36 RP-36 RP-36
Insulation Wrap NAD Listed on Map Listed on Map Listed on Map
GCSG-01 RP-11 Gasket 70% Chrysotile
Shelf SEE MAP 5 Abated/ Removed
GCSG-02 RP-11 Conveyor Belt Type NAD Above Off. SEE MAP
GCSG-03 GCSG-04 GCSG-05
RP-11 RP-11 RP-11
1/2" Pipe Insulation NAD SEE MAP SEE MAP SEE MAP
GCSG-06 RP-11 Green Gasket Material NAD Storage SEE MAP
GCSG-07 RP-11 Yellow Gasket Material NAD Storage SEE MAP
GCSG-08 RP-11 2" Hose NAD SEE MAP
GCSG-09 RP-11 3" Wide Belt NAD SEE MAP
GCSG-10 RP-11 Rubber Sleeve Blanket NAD Shelves SEE MAP
GCSG-11 RP-11 Rubber Sleeve Collar NAD Shelves SEE MAP
GCSG-12 RP-11 Rubber Sleeve Square NAD Shelves SEE MAP
GCSG-13 RP-11 Square Gasket NAD Shelves SEE MAP
GCSG-14 RP-11 1 1/2" Hose NAD Shelves SEE MAP
GCSG-15 RP-11 Rubber Boot NAD Shelves SEE MAP
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
GCSG-16 RP-11 Laminated Pad w/ White Center
NAD Shelves SEE MAP
GCSG-17 RP-11 Gray Laminated PAD 10% Chrysotile
Shelves SEE MAP 5
GCSG-18 RP-11 1/2" Rope Gasket 35% Chrysotile
Shelves SEE MAP 5
GCSG-19 RP-11 1/4" Rope Gasket 40% Chrysotile
Shelves SEE MAP 5
GCSG-20 RP-11 1/16" Dead Rope Gasket 15% Chrysotile
Shelves SEE MAP 5
GCSG-21 RP-11 1" Rope Gasket NAD Shelves SEE MAP
GCSG-22 RP-11 1/8" x 1/2" Rope Gasket NAD Shelves SEE MAP
GCSG-23 RP-11 3/8" Rope Gasket 35% Chrysotile
Shelves SEE MAP 5
GCSG-24 RP-11 1/8" Rope Gasket 25% Chrysotile
Shelves SEE MAP 5
GCSG-25 RP-11 Tan Gasket Material NAD Shelves SEE MAP
GCSG-26 RP-11 2'x4' Ceiling Tile with Punched Holes
NAD SEE MAP
GCSG-27 RP-11 Gray Gasket Material NAD SEE MAP
GCSG-28 RP-11 White 3/4" Packing NAD 2nd Shelf SEE MAP
GCSG-29 RP-11 Orange Gasket Material NAD 6th Shelf SEE MAP
GCSG-30 RP-11 Tan Gasket Material NAD 6th Shelf SEE MAP
GCSG-31 RP-11 2 1/2" Wipe Belt NAD 2nd Shelf SEE MAP
GCSG-32 RP-11 Conveyor Belt-Tan NAD SEE MAP
GCSG-33 RP-11 1/2" Hose NAD SEE MAP
RP-11 12"x12" Floor Tile Assumed 5
LBH-01 LBH-02 LBH-03
RP-4 RP-4 RP-4
Steam Pipe Insulation NAD SEE MAP Up 12 SEE MAP Up 12 SEE MAP Up 12
Done-RAJ
LBH-04 LBH-05 LBH-06
RP-4 RP-4 RP-4
Water Line Domestic NAD SEE MAP Up 12 SEE MAP Up 12 SEE MAP Up 12
Done-RAJ
LBH-07 LBH-08 LBH-09
RP-4 RP-4 RP-4
Tank Insulation 3 tanks approx. 300 gal covers entire tanks
30% Chrysotile 20% Amosite10% Crocidolite
Mechanical RoomMechanical Room Mechanical Room
1 Done-RAJ
MSG-01 MSG-02 MSG-03
RP-5 Pipe Insulation, 1 1/2" NAD 14L -1/0/515L +1/0/1211L -1/0/12
Done-RAJ
MSG-04MSG-05 MSG-06
RP-5 Pipe Insulation, 1" NAD 13L -1/0/1213H -1/0/1215H -1/0/12
Done-RAJ
MSG-07 RP-5 Rope, white NAD 13L -4/0/4 Done-RAJ
MSG-08 MSG-09 MSG-10
RP-5 Pipe Insulation, 8" NAD 17H +1/+4/117H +1/+4/417H +1/+4/6
Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
MSG-11 RP-5 Cloth Wrap NAD H15 +6/+4/7 Done-RAJ
MSG-12 RP-5 Bulletin Board NAD K5 +10/+2/4 Done-RAJ
MSG-13 RP-5 Fire Door Gasket Material 70% Chrysotile
K6 +10/+2/5 5 Done-RAJ
MSG-14 RP-5 Transit Board 50% Chrysotile
L13 -15/0/9 1 Done-RAJ
MSG-15 RP-5 2'x4' Ceiling Tile, Fissured NAD L4 -10/-4/7 Done-RAJ
MSG-16 RP-5 Green Hose, 1/2" NAD L15 0/0/0 Done-RAJ
MSG-17 RP-5 Red Hose, 1" NAD L4 -8/-2/0 Done-RAJ
MSG-18 RP-5 Cloth Covered Hose, 3/4" NAD K3 +10/-2/3 Done-RAJ
MSG-19 RP-5 Blue Gasket Material NAD N4 +2/+12/9 Done-RAJ
MSG-20 RP-5 Black Hose, 1" NAD H3 -2/+10/5 Done-RAJ
MSG-21 RP-5 Ring Gasket NAD H3 -7/0/6 Done-RAJ
MSG-22 RP-5 Spray on Coating 3% Chrysotile
L3 -7/+8/4 5 Done-RAJ
MSG-23 RP-5 Gasket Rope, 1/8" 35% Chrysotile
L3 -12/5/5 3 Done-RAJ
MSG-24 RP-5 Gasket Cloth NAD E6 +8/-20/1 Done-RAJ
MSG-25 RP-5 Rope Gasket NAD E4 -2/-4/3 Done-RAJ
MSG-26 MSG-27 MSG-28
RP-5 Tank Insulation NAD E3 +10/+20/4E3 +10/+22/2E3 +12/+22/2
Done-RAJ
MSG-29 MSG-30 MSG-31
RP-5 Pipe Insulation NAD E3 +1/+18/12E2 +7/+14/2F2 0/-1/14
Done-RAJ
MSG-32 MSG-33
RP-5 Pipe Insulation, 4" NAD E2 0/+5/24E2 +3/+2/24
Done-RAJ
MSG-34 MSG-35
RP-5 Pipe Insulation, 2" NAD E2 +1/+1/24E2 +1/+1/18
Done-RAJ
MSG-36 RP-5 Vacuum Hose, 5" NAD E2 +4/+3/5 Done-RAJ
MSG-37 RP-5 VERIFY Done-RAJ
MSG-38 RP-5 Pipe Insulation, 2" NAD B10 +1/0/10 Done-RAJ
MSG-39 RP-5 Yellow Ring Isolator, 1" NAD E8 +6/+8/4 Done-RAJ
MSG-40 RP-5 Red Isolator Board NAD E8 +7/+18/4 Done-RAJ
MSG-41 RP-5 Green Hose, 1" NAD E10 +1/+12/5 Done-RAJ
MSG-42 RP-5 Black Hose, 1" NAD E10 +2/+12/5 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
MSG-43 RP-5 Red Hose, 1" NAD E10 +2/+12/5 Done-RAJ
MSG-44 RP-5 Red Hose, 1/2" NAD E10 +3/+12/5 Done-RAJ
MSG-45 RP-5 Hose, 7/8" NAD E10 +5/+12/5 Done-RAJ
MSG-46 RP-5 Pump Diaphragm Gland NAD E10 +1/+10/5 Done-RAJ
MSG-47 RP-5 Pump Diaphragm Gland NAD E10 +1/+6/5 Done-RAJ
MSG-48 RP-5 Red Hose, 3/8" NAD E10 +5/+6/1 Done-RAJ
MSG-49 RP-5 Green Gasket Material NAD H11 +8/-2/6 Done-RAJ
MSG-50 RP-5 Rigid Gasket, 10" 8% Chrysotile
H9 0/-10/2 1 Done-RAJ
MSG-51 RP-5 Packing Rope, 1/4" 65% Chrysotile
H13 -2/-2/1 5 Done-RAJ
MSG-52 RP-5 Rope Gasket, 1/4" NAD H14 -2/-12/4 Done-RAJ
MSG-53 RP-5 Pipe Insulation, 4" NAD N17 0/-4/24 Done-RAJ
MSG-54 RP-5 Old Conveyor Belt Patch NAD Location on Map Done-RAJ
MSG-55 MSG-56 MSG-57
RP-5 Pipe Insulation, 6" NAD E17 -1/-4/5E17 -1/-4/3E17 -1/-4/1
Done-RAJ
RP-5 Brake Shoes Assumed 3 Done-RAJ
RP-5 Shelves L8 to L9 Assumed 1 Done-RAJ
RP-5 Mud Joints Assumed 5 Done-RAJ
PLG-01 RP-6 2'x4' Ceiling Tile NAD Tool Room Done-RAJ
PLG-02 RP-6 2'x4' Insulation Tile NAD SEE MAP Done-RAJ
PLG-03 RP-6 Air Duct Wrap NAD Tool Room SEE MAP Done-RAJ
PLG-04 RP-6 2'x4' Fissured Ceiling Tile NAD Lunch Rm. SEE MAP Done-RAJ
PLG-05 RP-6 1'x1' Ceiling Tiles with Holes
NAD Lunch Rm. SEE MAP Done-RAJ
PLG-06 RP-6 2'x4' Smooth Ceiling Tiles NAD Hallway SEE MAP Done-RAJ
PLG-07 PLG-08PLG-09
RP-6 Pipe Insulation, 2" NAD Hall to OfficeMechanical RoomMechanical Room
Done-RAJ
PLG-10 RP-6 New Dry Wall NAD Mech. Rm. SEE MAP Done-RAJ
PLG-11 RP-6 Dry Wall Tape Joint NAD Mech. Rm. SEE MAP Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
PLG-12 RP-6 Old Dry Wall NAD Mech. Rm. SEE MAP Done-RAJ
PLG-13 RP-6 Wall Plaster NAD Mech. Rm. SEE MAP Done-RAJ
PLG-14 RP-6 Air Duct Expansion Joint NAD Mech. Rm. SEE MAP Done-RAJ
PLG-15PLG-16PLG-17
RP-6 Pipe Insulation, 1 1/2" NAD N. Wall 2nd E/W +3N. Wall 2nd E/W +5N. Wall 2nd E/W +9
Done-RAJ
PLG-18 RP-6 Old Felt Paper NAD N/S2 E/W4 -2/0/4 Done-RAJ
PLG-19 RP-6 Cloth Wrap NAD N/S2 E/W4 -2/0/4 Done-RAJ
PLG-20 RP-6 Green Conveyor Belt NAD N/S2 E/W4 -1/0/4 Done-RAJ
PLG-21 RP-6 Grooved Conveyor Belt NAD N/S2 E/W4 -8/0/1 Done-RAJ
PLG-22 RP-6 Gasket NAD N/S2 E/W4 -10/0/1 Done-RAJ
PLG-23 RP-6 Yellow Flex Hose, 1 1/2" NAD N/S1 E/W8 -2/-2/1 Done-RAJ
PLG-24 RP-6 Insulator Blocks NAD N/S2 E/W6 -12/-10/2 Done-RAJ
PLG-25 RP-6 Rigid Fiber Gasket NAD N/S8 E/W6 -8/+8/3 Done-RAJ
PLG-26 RP-6 Soft, White Gasket NAD N/S19 E/W6 -8/+2/4 Done-RAJ
PLG-27 RP-6 Red, Ring Gasket NAD N/S19 E/W6 -14/-2/4 Done-RAJ
PLG-28 RP-6 Tan, Rigid Gasket 15% Chrysotile
N/S10 E/W6 0/0/6 5 Done-RAJ
PLG-29PLG-30 PLG-31
RP-6 RP-6 RP-6
Pipe Insulation, 1 1/4" NAD N/S7 E/W6 -1/0/12N/S7 E/W6 -4/0/20N/S7 E/W6 -8/0/20
Done-RAJ
PLG-32 PLG-33 PLG-34
RP-6 RP-6 RP-6
Pipe Insulation, 2" NAD N/S4 E/W6 -1/0/10N/S4 E/W6 -1/0/20N/S4 E/W6 -8/0/24
Done-RAJ
PLG-35 PLG-36 PLG-37
RP-6 RP-6 RP-6
Pipe Insulation, 3" NAD N/S3 E/W8 -1/0/24N/S3 E/W8 -1/+4/24N/S3 E/W8 -2/-12/24
Done-RAJ
PLG-38 PLG-39 PLG-40
RP-6 RP-6 RP-6
Pipe Insulation, 10" NAD N/S1 E/W6 -10/0/24N/S3 E/W6 -5/0/24 N/S1 E/W6 -2/0/22
Done-RAJ
PLG-41 PLG-42 PLG-43
RP-6 RP-6 RP-6
Pipe Insulation, 2 1/2" NAD N/S3 E/W1 -12/0/22N/S3 E/W2 +12/+18/24N/S3 E/W3 -18/+18/24
Done-RAJ
PLG-44 PLG-45 PLG-46
RP-6 RP-6 RP-6
Pipe Insulation, 6" NAD N/S6 E/W1 +2/-17/24N/S6 E/W2 +2/-10/24N/S6 E/W3 +2/+5/24
Done-RAJ
PLG-47 PLG-48 PLG-49
RP-6 RP-6 RP-6
Pipe Insulation, 2 1/2" 5% Chrysotile
N/S15 E/W2 -8/+3/6N/S15 E/W2 -10/+3/6N/S15 E/W2 -8/+3/15
2 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
PLG-50PLG-51 PLG-52
RP-6 RP-6 RP-6
Pipe Insulation, 1" NAD S. Ent. W. Corner +12S. Ent. W. Corner +9S. Ent. W. Corner +0
Done-RAJ
PLG-53 RP-6 Conveyor Belt/ Door-air Stop
NAD S. Entr. Door Bottom Done-RAJ
PLG-54 RP-6 Expanded Foam Insulation NAD N/S10 E/W1 -12/0/4 Done-RAJ
PLG-55 RP-6 Spun Wool NAD Heated Room Done-RAJ
PLG-56 RP-6 Building Insulation NAD N/S7 E/W1 -8/0/5 Done-RAJ
PLG-57 RP-6 Wall Board NAD N/S4 E/W1 -12/0/4 Done-RAJ
RP-6 12"x12" Black Floor Tile Assumed 1 Done-RAJ
PRG-01 RP-18 2'x4' Ceiling Tile Fissured NAD Lunch Rm. Central Off.
PRG-02 RP-18 Drywall (Movable Wall Partition)
NAD Lunch Rm. Central Off.
PRG-03 RP-18 Drywall Mud Joint NAD Wash Room Tech. Off.
PRG-04 RP-18 Drywall - Old NAD Wash Room Tech. Off.
PRG-05 RP-18 1'x2' Suspended Ceiling Tile
NAD Restroom Tech. Off.
PRG-06 RP-18 Mechanical Room Drywall NAD Mech. Rm. Tech. Off.
PRG-07 RP-18 1/2" Copper Pipe w/Insulation
NAD Mech. Rm. Tech. Off.
PRG-08 RP-18 Building Insulation NAD Exterior Mech. Room
PRG-09 PRG-10 PRG-11
RP-18 RP-18 RP-18
1" Pipe w/Insulation NAD W. Offices Mech Rm.W. Offices Mech Rm.W. Offices Mech Rm.
PRG-12 RP-18 Drywall NAD Mechanical Room
PRG-13 RP-18 Drywall-Tape Joint 5% Chrysotile
Mech. Rm. Central Off. 5
PRG-14 RP-19 2'x4' Ceiling Tile, Smooth NAD SEE MAP
PRG-15 RP-19 Insulation Wrap On Electrical Lines
NAD E1 +70/0/6
PRG-16 RP-19 1 1/2" Pipe w/Insulation NAD W. Bet. Potline 3B & 4A
PRG-17 RP-19 1" Pipe w/Insulation NAD W. Bet. Potline 3B & 4A
PRG-18PRG-19PRG-20
RP-22 RP-22 RP-24
1 1/4" Pipe Insulation NAD E. Bet. Potline 2A & 1B E. Bet. Potline 2A & 1BE. Bet. Potline 2A & 1B
PRG-21 RP-22 Duct Wrap NAD Tool Room
PRG-22 RP-21 2'x2' Ceiling Tile, Fissured NAD Lunch Rm. W. Tool Rm.
PRG-23 RP-21 1/8" Packing Gasket 70% Chrysotile
E. Tool Rm. - Storage 5
PRG-24 RP-23 Rigid Wall Board Insulation NAD 1A & 1B W. Cross Over
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
PRG-25 RP-23 Conveyor Belt NAD 1A West Heater
RP-23 12"x12" Floor Tile, Black Assumed 5
RP-23 9"x9" Floor Tile, Green Assumed 5
RP-23 12"x12" Floor Tile, Pink/Tan
Assumed 1
RP-23 24"x24" Floor Tile, White Assumed 1
RP-23 12"x12" Floor Tile, Tan Assumed 1
PRO-1 Mineral 11-13% Non-Fibrous 87-89%, White, Mudded Fitting
Non Detected
Pot Room Office
QH-01 RP-40 2" x 4" Ceiling tile NAD Office Area Up 8
RP-40 12"x12" Floor Tile, Black Assumed 1 Done-RAJ
RBH-01 RBH-02 RBH-03
RP-25 RP-25 RP-25
Pipe Insulation, 18" NAD See Map, Up 7 See Map, Up 12 See Map, Up 12
RBH-04 RBH-05 RBH-06
RP-25 RP-25 RP-25
Pipe Insulation, 3" NAD See Map, Up 12 See Map, Up 12 See Map, Up 10
RBH-07 RBH-08 RBH-09
RP-25 RP-25 RP-25
Pipe Insulation, Steam Line NAD See Map, Up 10 See Map, Up 6 See Map, Up 10
RBH-10 RBH-11 RBH-12
RP-25 RP-25 RP-25
Pipe Insulation, Condensate Line
NAD See Map, Up 10 See Map, Up 10 See Map, Up 10
RBH-13 RBH-14 RBH-15
RP-25 RP-25 RP-25
Pipe Insulation, 2" NAD See Map, Up 15 See Map, Up 15 See Map, Up 6
RBH-16 RBH-17 RBH-18
RP-25 RP-25 RP-25
Pipe Insulation, Small Domestic Water
NAD See Map, Up 10 See Map, Up 10 See Map, Up 12
RBH-19 RBH-20 RBH-21
RP-25 RP-25 RP-25
Pipe Insulation, Large Domestic Water
NAD See Map, Up 1 See Map, Up 6 See Map, Up 10
RBH-22 RP-25 2'x4' Drop Ceiling Tile NAD See Map, Up 10
RBH-23 RBH-24
RP-25 RP-25
Dry Wall and Joint NAD See Map, Up 4 See Map, Up 7
RBH-25 RP-25 2'x4' Drop Ceiling Tile NAD See Map, Up 10
RBH-26 RP-25 Duct Wrap NAD See Map, Up 6
RBH-27 RP-25 Vibration Damper NAD See Map, Up 7
RBH-28 RBH-29 RBH-30
RP-25 RP-25 RP-25
Pipe Insulation Wrap, 28 Westinghouse, Lines 3 and 4
5% Chrysotile, about 20 ft. per unit
Rectifier #31A Rectifier #37B Rectifier #47B
1
RBH-31 RP-25 Fire Blanket NAD South East Corner of Basement
RP-25 9"x9" Grey Floor Tile Assumed 4 Gone
RP-25 Arc Shoots Assumed 2 Qty 56
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
RP-25 12"x12" Black Floor Tile Assumed 1 Non Asbestos
RP-25 Mud Joints Assumed 1
RCHH-01 RP-2 2'x4' Drop Ceiling Tile NAD SEE MAP Done-RAJ
RP-2 12"x12" Black Floor Tile Assumed 1 Done-RAJ
RCTG-01 RCTG-02 RCTG-03
RP-43 RP-43 RP-43
Pipe Insulation, 3" NAD SEE MAP SEE MAP SEE MAP
Done-RAJ
RCTG-04 RP-43 Pipe Paint, 3" NAD SEE MAP Done-RAJ
RCTG-05 RCTG-06
RP-43 RP-43
Pipe Insulation, 12" NAD SEE MAP SEE MAP
Done-RAJ
RCTG-07 RCTG-08 RCTG-09
RP-43 RP-43 RP-43
Fan Shroud NAD SEE MAP SEE MAP SEE MAP
Done-RAJ
REBH-01 REBH-02 REBH-03
RP-1 RP-1 RP-1
Pipe Insulation, 1" NAD Mechanical Room Mechanical Room Mechanical Room
Done-RAJ
REBH-04 REBH-05 REBH-06
RP-1 RP-1 RP-1
Pipe Insulation, 2" NAD Mechanical Room Mechanical Room Mechanical Room
Done-RAJ
REBH-07 REBH-08 REBH-09
RP-1 RP-1 RP-1
Pipe Joint Insulation NAD Mechanical Room Mechanical Room Mechanical Room
Done-RAJ
REBH-10 RP-1 Vibration Damper NAD Mechanical Room Done-RAJ
REBH-11 RP-1 Duct Wrap NAD Mechanical Room Done-RAJ
REBH-12 REBH-13
RP-1RP-1
Domestic Water Line, 1" NAD Jan. Clst. Men's Rstrm Jan. Clst. Men's Rstrm
Done-RAJ
REBH-14 RP-1 Pipe Insulation, 2" NAD Janitor Closet Up 12 Done-RAJ
REBH-15 RP-1 Domestic Water Line, 1" NAD Jan. Clst. Men's Restrm Done-RAJ
REBH-16 REBH-17
RP-1RP-1
Pipe Insulation, 2" NAD Janitor Closet Up 12Janitor Closet Up 12
Done-RAJ
REBH-18 RP-1 Dry Wall NAD Mechanical Room Done-RAJ
REBH-19 RP-1 Dry Wall Compound NAD Mechanical Room Done-RAJ
REBH-20 RP-1 2'x4' Drop Ceiling Tile NAD Dwg. File Room Done-RAJ
RP-1 9"x9" Floor Tile, Tan Assumed 4 Done-RAJ
RP-1 Mud Joints Assumed 1 Done-RAJ
RP-1 1'x1' Grey Floor Tile Assumed 1 Done-RAJ
RH-01 RP-23 Pipe Insulation NAD E2, North Wall, Up 30
RH-02 RP-24 Storage Pipe and Insulation Debris
NAD E23, North Side, Up 15
RH-03RH-04 RH-05
RP-24 RP-24 RP-24
Pipe Insulation, Steam Pipe
25% Chrysotile
E29, North Side Up 7 E29, Center Up 40 E29, Center Up 40
5 not there
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
RH-06 RP-23 2'x4' Ceiling Tile NAD E21, South Side, Up 8
RH-07 RH-08 RH-09
RP-23 RP-23 RP-23
Pipe Insulation NAD E19 +9 S.Wall Up11 E19 +9 S.Wall Up 13E19 +9 S.Wall Up 11
RH-10 RH-11
RP-23 RP-23
Dry Wall and Joint Material NAD E19 +15 S.Wall Up 4E19 +13 S.Wall Up 10
RH-12 RP-23 2'x4' Ceiling Tile NAD Office E19 S. Wall Up 8
RH-13 RP-23 2'x4' Ceiling Tile NAD Office E19 S. Wall Up 8
RH-14 RP-23 2'x4' Ceiling Tile NAD SW Lunch Room Up 8
RH-15 RH-16 RH-17
RP-23 RP-23 RP-23
Pipe Insulation, 1 1/2" NAD SEE MAP SEE MAP SEE MAP
RH-18 RH-19
RP-23 RP-23
Pipe Insulation NAD E2, Center, Up 40 E2, South Wall, Up 40
RH-20 RH-21 RH-22
RP-23 RP-23 RP-23
Pipe Insulation, Steam Line NAD E2, Center, Up 40SEE MAP, Up 40 SEE MAP, Up 40
RH-23 RP-23 Vibration Damper NAD E13 +12N. -15 Up 35
RH-24 RP-23 Compressed Air Line Wrap 95% Chrysotile
SEE MAP 7 not found
RH-25 RP-23 Duct Wrap 95% Chrysotile
SEE MAP 5 not found
RH-26 RH-27 RH-28
RP-23 RP-23 RP-23
Pipe Insulation, 4" NAD SEE MAP SEE MAP SEE MAP
RP-23 12"x12" Black Floor Tile, Lunch Room
Assumed 5
RP-23 12"x12" Black Floor Tile Assumed 2
RP-23 12"x12" Black Floor Tile Assumed 2
RP-23 Mud Joints Assumed 2
RLBH-01 RLBH-02 RLBH-03
RP-23 RP-23 RP-23
Pipe Insulation, 1" NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
RLBH-04RLBH-05 RLBH-06
RP-3 RP-3 RP-3
Pipe Insulation, 2" NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
RLBH-07RLBH-08 RLBH-09
RP-3 RP-3 RP-3
Pipe Joint Compound 80% Chrysotile ABATED
Mechanical RoomMechanical Room Mechanical Room
2 Done-RAJ
RLBH-10RLBH-11 RLBH-12
RP-3 RP-3 RP-3
Pipe Joint Insulation NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
RLBH-13 RP-3 Vibration Damper NAD Mechanical Room Done-RAJ
RLBH-14 RP-3 Duct Wrap NAD Mechanical Room Done-RAJ
RLBH-15 RLBH-16 RLBH-17
RP-3 RP-3 RP-3
Steam Pipe Insulation, 1 1/2"
10% Amosite
Above Lab Closet Wet LabAbove Closet Wet LabAbove Closet Wet Lab
1 Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
RLBH-18 RLBH-19RLBH-20
RP-3 RP-3 RP-3
Domestic Water Line, Insulation 3/4"
7% Amosite17 FT. APROX.
Mechanical RoomPrep. Room Under Sink
1 Done-RAJ
RLBH-21RLBH-22RLBH-23
RP-3 RP-3 RP-3
Pipe Insulation NAD Carbon Prep. Room Carbon Prep. Room Carbon Prep. Room
Done-RAJ
RLBH-24 RP-3 1'x1' Ceiling Tile NAD Wet Lab Done-RAJ
RLBH-25 RP-3 2'x4' Ceiling Tile NAD Wet Lab Done-RAJ
RLBH-26 RP-3 Lab Counter Tops 15% Chrysotile
Wet Lab 2 Done-RAJ
RLBH-27RLBH-28RLBH-29RLBH-30RLBH-31
RP-3RP-3RP-3RP-3RP-3
Wall Plaster NAD Air Control RoomI.H. RoomEnvironmental RoomIron Sample RoomSample Prep Room
Done-RAJ
RLBH-32RLBH-33
RP-3 RP-3
Dry Wall Compound NAD Tony Ross Off. CompChemical Storage Drywall
Done-RAJ
RP-3 Transit Fume Hoods Assumed 2 Done-RAJ
RP-3 4900 sq. ft. 9"x9" Floor Tile
Assumed 2 Done-RAJ
RP-3 Mud Joints Assumed 1 Done-RAJ
RP-3 Mud Joints, 3/4" Assumed 1 Done-RAJ
RP-3 Mud Joints, 1 1/2" Assumed 1 Done-RAJ
RP-3 12"x12" Floor Tile, Black Assumed 1 Done-RAJ
ROBH-01 RP-2 Pipe Insulation, 1" NAD Mechanical Room Done-RAJ
ROBH-02ROBH-03
RP-2 RP-2
Pipe Insulation, 2" NAD Mechanical Room Mechanical Room
Done-RAJ
ROBH-04 RP-2 Duct Wrap NAD Mechanical Room Done-RAJ
ROBH-05 RP-2 Vibration Damper NAD Mechanical Room Done-RAJ
ROBH-06 RP-2 Dry Wall NAD Mechanical Room Done-RAJ
ROBH-07ROBH-08
RP-2RP-2
Pipe Insulation, 1" NAD Mechanical RoomMechanical Room
Done-RAJ
ROBH-09 RP-2 Pipe Insulation, 2" NAD Mechanical Room Done-RAJ
ROBH-10 ROBH-11 ROBH-12
RP-2 RP-2 RP-2
Pipe Joints NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
ROBH-13ROBH-14 ROBH-15
RP-2 RP-2 RP-2
Pipe Joints Insulation NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
ROBH-16 ROBH-17 ROBH-18
RP-2 RP-2 RP-2
Hot Water Tank Insulation NAD Mechanical RoomMechanical Room Mechanical Room
Done-RAJ
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
ROBH-20 RP-2 Dry Wall NAD Janitor's Closet Done-RAJ
RP-2 1'x1' Ceiling Tile NAD Conference Room Done-RAJ
ROBH-21 RP-2 1" Domestic Water Line NAD Janitor's Closet Done-RAJ
RP-2 9"x9" Grey Floor Tile Assumed 4 Done-RAJ
RP-2 1'x1' Floor Tile, Light Grey Assumed 1 Done-RAJ
RP-2 Mud Joint Assumed 1 Done-RAJ
RP-2 Pipe Joints Assumed 1 Done-RAJ
RPHH-01RPHH-02 RPHH-03
RP-28 RP-28 RP-28
Pipe Insulation NAD At Pumps, Up 2At Pumps, Up 2At Pumps, Up 1
RPHH-04 RPHH-05 RPHH-06
RP-28 RP-28 RP-28
Pipe Insulation NAD NW Side at HeaterCenter of Bldg. S. End at Heater
RPHH-07 RPHH-08 RPHH-09
RP-28 RP-28 RP-28
Pipe Insulation, Condensate Line
35% Amosite
NW Corner, Up 14NW Corner, Up 14 NW Corner
2
RPHH-10 RPHH-11 RPHH-12
RP-28 RP-28 RP-28
Pipe Insulation, Steam Line 35% Amosite
NW Corner NW Corner NW Corner
2
RPHH-13 RPHH-14 RPHH-15
RP-28 RP-28 RP-28
Insulation Joints on Water Line
NAD At Pumps in Center At Pumps in Center At Pumps in Center
RP-28 Mud Joints (2) Assumed 5
RP-28 Mud Joints (9) Assumed 2
RUH-01 RP-33 2'x4' Ceiling Tile NAD Old Office Up 8 Done-RAJ
RUH-02 RUH-03
RP-33 RP-33
Dry Wall NAD Old Off. Up 4 Comp.Old Off. Up 4 Drywall
Done-RAJ
RUH-04 RP-33 Wall Insulation NAD Old Office Done-RAJ
RP-33 12"x12" Floor Tile Assumed 1 Done-RAJ
S20G-01 RP-38 Roof Mastic NAD SEE MAP Done-RAJ
SP-01 RP-37 Pipe Insulation NAD SEE MAP
SP-02 RP-37 1" Pipe Insulation NAD W of AU1 Pitch Pump
SP-03 RP-37 3" Pipe Insulation NAD W of AU1 Pitch Pump
SP-04 SP-05
RP-37RP-37
1" Pipe Insulation NAD A64120-AU2 STM ValveN of AU2 Pitch Pump
SP-06SP-07
RP-37RP-37
3" Pipe Insulation NAD N of AU2 Pitch Pump N of AU2 Pitch Pump
SP-08 RP-37 Flange Gasket Material 45% Chrysotile
N of AU2 Pitch Pump 5
SP-09SP-10
RP-37RP-37
Pipe Insulation, 3 1/2" NAD See Map, Up 3 See Map, Up 14
SP-11 SP-12 SP-13
RP-37RP-37 RP-37
Pipe Cloth Wrap, 2 1/2" NAD S. Line, E. Tank N. Line, E. Tank N. Line, W. Tank
SP-14 RP-37 Caulking Material 2% Chrysotile
West Tank 5
SP-15 SP-16 SP-17
RP-37RP-37 RP-37
Felt Paper Pipe Wrap 15% Chrysotile
S. of East TankS. of East Tank Edge of East Pit
4
Sample ID Sheet # Description
% and Typeof
AsbestosLocation
ConditionRank
Status
SP-17ASP-18A
RP-37RP-37
Caulking NAD See Map See Map
SP-18 RP-37 2 1/2" Pipe Insulation NAD East Side of East Pit
SP-20 SP-21 SP-22
RP-37RP-37 RP-37
Pipe Joint Insulation, 1" NAD See MapSee MapSee Map
SP-23 SP-24 SP-25
RP-37RP-37 RP-37
Pipe Joint Insulation, 3" NAD See MapSee MapSee Map
ULH-01 RP-34 2'x4' Drop Ceiling NAD Lunch Room Done-RAJ
RP-34 12"x12" Black Floor Tile, Unloading Control Building
Assumed 7 Done-RAJ
RP-34 12"x12" Black Floor Tile, Lunch Room and Restroom
Assumed 1 Done-RAJ