Transcript of Thru Tubing ESP-Cable Deploy - platinum - Petronas
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 1
© 2017 PETROLIAM NASIONAL BERHAD (PETRONAS)
All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
Thru Tubing ESP-Cable Deploy
Alternative Artificial Lift Team @ PETRONAS
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 2
Introduction
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 3
Introduction
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 4
Concept of the technology
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 5
Project Background
23 May 2018
Open
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 6
Internal
ESP Deployment Method
$$$
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 7
Thru Tubing ESP - CD System
Pump OD
Motor
Operating
Temperature
Operating
Liq Rate
Range
Technology
Readiness
Gas Handling
Permanent Magnet
Motor (Proven)
Speed: 8500rpm
Rated Power: 47HP
Up to 300⁰F
157-629blpd
BEP:500blpd
TRL#5
(Approved on
4th May 2017)
Via gas handler,
GVF limit 40%
2.17”
Insert SCSSV
Cable
Termination
Spool
Deployment
Unit
Well Control
Equipment
Retrievable
Packer
Special design spool
equipped with
vertical & horizontal
penetrators and
cable hanger.
New insert safety
valve with 0.8” cable
feed thru and lock
profile matched with
existing nipple.
Similar specifications
to a braided line unit
with winch designed
for 0.8” cable.
Quad BOP with
special rams for 0.8”
HDPE type cable
and dual-pack off.
Retrievable packer
designed with anti
torque PBR and ESP
profile intake.
Internal
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 8
Applications of the technology
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 9
Well Screening Criteria for TT-ESP217 Series (BEP 500 bbl/day)272 Series (BEP 1200 bbl/day)
Internal
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 10
TTESP General Cost Breakdown
Internal
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 11
BO-309
Open
Location:
Bokor
(Offshore Miri,
Sarawak)
Completion:
BO-309T – Sand A3/A6
Well Status:
BO-309T :
Flowing (GL)
Last Production
BO-309T :120
bopd (Oct ’15)
Cum Oil Prod. /
Reserves @ 1.1.15
BO-309T : 0.350
MMbbl / 1.594 MMbbl
Diagnosis:
BO-309T ESP cable is grounded hence the ESP is not able to
run anymore. Well is currently flowing via GL in the mean time
before an ESP replacement is done. TTESP installation is
proposed for this well in place of the conventional WO
method.
Job objective:
To perform TTESP installation via wireline deployment method
and wellhead modification in order to achieve 200 bopd gain
at well level and 150 bopd gain at field level from GL gas
reallocation, accelerating 0.3 MMSTB reserves production from
this well.
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 12
Overall TTESP-CD Installation Timing
Open
1. Prolong TIT due to:
2. TTESP BHA installation tool longer than expected due to replacement of the failed downhole sensor
3. Cable hanger installation could not be installed as per program (NPT of 12-14 hours)
4. Overall TTESP installation went smoothly without major incidents, however number of constructive findings were recorded
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 13
Planning – Onshore Trial Labuan
Open
Installation equipment setup
TTESP assemblyTraining well workover to ensure integrity for flow test and insert valve setting
Cable Hanger & Penetrators
Cable termination spool installed on dual completion
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 14
Installation – Bokor 309 SKO
Open
Deck Layout
Cable termination spool installation
TTESP RIH with PCE
TTESP assembly
On Production
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 15
Value creations
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 16
The UEC for Conventional ESP is ~RM43/boe. The trial for other deploymenttechniques such as Thru Tubing (rig-less) may potentially lower down the UEC to~RM34/boe.
Internal
Conventional ESP vs TTESP
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 17
Value Creation
Open
•
•
•
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 18
Limitation & Potential Improvement
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 19
Uncertainties/operational constraints
Open
Presentation Title (acronym) ;Division – Name/OPU/HCU/BU (acronym) ;Name of Presenter ©Petroliam Nasional Berhad (PETRONAS) 2014 20
1. ESP system oil servicing (filling) during assembly must be done from bottom up therefore ESP cannot be assembled exactly like a wireline string
2. ESP system length is extremely long – for deeper wells could prove difficult or impossible in current configuration to install on live well.
3. Flowrate – presently maximum rate deliverable is around 1500bbl/d for 3.5” tubing
4. 2-7/8” insert safety valve has very small flow area
Limitations
Open
Solutions/developments/improvements
1. Novomet to provide oil containing ESP units which can be assembled without oil servicing or a system which can be oil filled from the bottom.
2. Novomet are developing a system which can be deployed in sections and working on a set of rams which can close around a sealed part of the ESP system.
3. Novomet working on higher rate 217 and 272 systems.
4. Looking at other options from other vendors for the insert safety valve to increase flow area.