Thanks Giving (Extension of time for Fee Payment (III B.Tech ...
-
Upload
khangminh22 -
Category
Documents
-
view
0 -
download
0
Transcript of Thanks Giving (Extension of time for Fee Payment (III B.Tech ...
Date : 20.10.2020.
Letter – Thanks Giving
(Extension of time for Fee Payment
(III B.Tech. and IV B.Tech.)
The college administration whole heartedly thank all the parents and their
wards (our students) who remitted their III Year and IV Year B.Tech, annual College
Fee for the year 2020-21. Though fee payment is an ordained obligation, the
prevailing conditions command special commendations. The administration is fully
aware of the trauma, the society has been passing through in this pandemic period ;
yet you all did the BEST by walking an extra mile to support your institution in
maintaining its academic progression move on unhindered.
Of the 2500 students from III & IV B.Tech., close to 1900 students paid the
fee and the receipts have been generated to those whose payments are reconciled
with college accounts. However, some 60-70 students, despite their payment of fee,
the receipt could not be generated as the office is yet to reconcile their remittances
with college accounts, for want of certain details.
A list is now displayed in our college website with students names and
payment details. The names of those who paid to our college Account
No.10615612672, but not in the list of “fee paid students”, are advised to send the
following details.
(a) Name (b) Roll No. (c) Date of payment (Voucher copy) (d) Amount paid
(e) Name of the Branch (f) Bank Account No. through which the Amount
transferred (g) Loan Account No.
Hope you have been attending to all classes going online, a new paradigm in
the learning process.
Thank you all once again
SPECIAL NOTE : The time for fee payment to III B.Tech. & IV B.Tech. is further
extended upto 23rd
October, 2020 and all those who are yet to pay the fee are
advised to remit the same in the stipulated time without fail.
Click here to view the students list.
Sd/-
Dean, Administration
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1 17131A0828III
B.TECH.CHEM KOMARA PURUSHOTTAM 12479 14.10.2020
2 17131A0849III
B.TECH.CHEM SHAIK ABDUL AZIZ 12769 14.10.2020
3 18131A0801III
B.TECH.CHEM AKKINAPALLI MANOHAR BABU 11527 15.09.2020
4 18131A0802III
B.TECH.CHEM ALAGHARI HARSHA JAGAN 11277 16.09.2020
5 18131A0803III
B.TECH.CHEM BAGADHI ABHILASH 11058 9.09.2020
6 18131A0804III
B.TECH.CHEM BATHULA HARSHA VARDHINI 10764 4.09.2020
7 18131A0805III
B.TECH.CHEM BODDU KRISHNA CHAITHANYA 11813 15.09.2020
8 18131A0806III
B.TECH.CHEM BUNGA SADGUNA NEEL RAJ VARMA 12175 28.09.2020
9 18131A0807III
B.TECH.CHEM BUSAM PRIYANKA 10799 8.09.2020
10 18131A0809III
B.TECH.CHEM DHARIMIREDDY TARUN 11883 28.09.2020
11 18131A0811III
B.TECH.CHEM DIRISAM LAVANYA 11329 13.09.2020
12 18131A0813III
B.TECH.CHEM DURGA PHANI SAI SHANMUKH 15.09.2020
13 18131A0814III
B.TECH.CHEM DUVVADA BHANUSREE 11535 15.09.2020
14 18131A0815III
B.TECH.CHEM GALLA RAMYA SHRI 12028 14.09.2020
15 18131A0817III
B.TECH.CHEM JYESTA VENKATA KRISHNA 12263 30.09.2020
16 18131A0818III
B.TECH.CHEM KANCHUMOJU RAKESH 12158 28.09.2020
17 18131A0819III
B.TECH.CHEM KARRI DURGAPRASAD 11745 15.09.2020
18 18131A0820III
B.TECH.CHEM KARRI KUSHWANTH 11942 14.09.2020
19 18131A0821III
B.TECH.CHEM KAVALA RAMATEJA 11121 11.09.2020
20 18131A0822III
B.TECH.CHEM KOSANA GOWTHAMI 11281 14.09.2020
21 18131A0823III
B.TECH.CHEM KOSANAM PHANEENDRA 12607 30.09.2020
22 18131A0825III
B.TECH.CHEM MADHAVI VADAMODULU 12694 30.09.2020
23 18131A0826III
B.TECH.CHEM MALLA LOKESH 11993 29.09.2020
24 18131A0827III
B.TECH.CHEM MOPIDEVI VEERA NAGA SAI GANESH 12648 30.09.2020
25 18131A0828III
B.TECH.CHEM MUDUNURI V S R K PHANEENDRA VARMA 11868 15.09.2020
26 18131A0829III
B.TECH.CHEM NAKKA BHARATH KUMAR 11564 15.09.2020
27 18131A0830III
B.TECH.CHEM NAMADI KISHORE 11602 15.09.2020
28 18131A0831III
B.TECH.CHEM NIDHI JHANSI 11587 15.09.2020
29 18131A0833III
B.TECH.CHEM PENTAKOTA MOHAN CHELLARAO 10718 31.08.2020
30 18131A0834III
B.TECH.CHEM PITCHA HEMANTH PHANI KUMAR 11369 12.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
31 18131A0836III
B.TECH.CHEM PUKKALLA TEJASWINI 12786 5.10.2020
32 18131A0837III
B.TECH.CHEM PYLA AVINASH 11592 15.09.2020
33 18131A0838III
B.TECH.CHEM RADHA SMRITHY PILLA 11935 14.09.2020
34 18131A0841III
B.TECH.CHEM RAVALAPUDI BALAJI 11598 15.09.2020
35 18131A0842III
B.TECH.CHEM REMALLI BHANUSH 11518 15.09.2020
36 18131A0843III
B.TECH.CHEM RUDRU SUDHAKAR 11108 10.09.2020
37 18131A0844III
B.TECH.CHEM SANA LAHARI 12213 18.09.2020
38 18131A0845III
B.TECH.CHEM SIRRA KARTHIK 11594 15.09.2020
39 18131A0847III
B.TECH.CHEM TAGARAM PRADEEP VAMSI 12125 17.09.2020
40 18131A0848III
B.TECH.CHEM TAMALAMPUDI SAI RAMYA LAKSHMI 10968 13.09.2020
41 18131A0849III
B.TECH.CHEM VANAPAMALA AKASH 11027 9.09.2020
42 18131A0850III
B.TECH.CHEM VARDHINENI RAJA GOPAL NAIDU 12122 17.09.2020
43 18131A0852III
B.TECH.CHEM VENKATA TARUN RAMINENI 10711 27.08.2020
44 18131A0853III
B.TECH.CHEM VORUGANTI SRI VISHNU VARDHAN 11021 9.09.2020
45 18131A0855III
B.TECH.CHEM BHEESETTI SEKHAR 11282 14.09.2020
46 19135A0801III
B.TECH.CHEM DASARI VENU GOPAL 10717 31.08.2020
47 19135A0803III
B.TECH.CHEM GOLI LEELA KUMARI 10716 31.08.2020
48 19135A0804III
B.TECH.CHEM KODUKULA JAGANNADHA VISHAL 11226 12.09.2020
49 19135A0805III
B.TECH.CHEM KODURU SRI TEJ KUMAR 10715 30.08.2020
50 19135A0806III
B.TECH.CHEM KOYILADA JAIPRAKASH 10980 13.09.2020
51 19135A0807III
B.TECH.CHEM MANIGAM LAVANYA RANI 11035 9.09.2020
52 19135A0808III
B.TECH.CHEM PENTAPALLI VENKATA SATYANARAYANA 11280 14.09.2020
53 19135A0809III
B.TECH.CHEM RAGITI SIVA KUMAR 11500 14.09.2020
54 19135A0811III
B.TECH.CHEM SURABATTULA JAHNAVI 10942 11.09.2020
55 17131A0801IV
B.TECH.CHEM ACHANTA TEJA SATYA SAI SRI MANIKANTA 12270 30.09.2020
56 17131A0802IV
B.TECH.CHEM ADRIT SAKSENA 12296 30.09.2020
57 17131A0803IV
B.TECH.CHEM AKHIL ARAVA 11507 15.09.2020
58 17131A0805IV
B.TECH.CHEM BALIVADA ANSHUMAN PATNAIK 11091 10.09.2020
59 17131A0807IV
B.TECH.CHEM BHAGAVATULA RAVI KUMAR 11162 12.09.2020
60 17131A0808IV
B.TECH.CHEM BHASKARA VENKATA DURGA PRASAD IRROTHU 11225 12.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
61 17131A0810IV
B.TECH.CHEM CHAKKA NAVEEN KUMAR 11549 15.09.2020
62 17131A0811IV
B.TECH.CHEM CHAKKA SATYAVATHI 11522 15.09.2020
63 17131A0813IV
B.TECH.CHEM CHOKKAPU LOHITHA 12310 10.10.2020
64 17131A0814IV
B.TECH.CHEM D. SRI NANDINI 12634 30.09.2020
65 17131A0815IV
B.TECH.CHEM DASAROJU DURGA PRIYA 12159 24.09.2020
66 17131A0818IV
B.TECH.CHEM CH GUNADEEP 12747 5.10.2020
67 17131A0820IV
B.TECH.CHEM IRRANKI VAISHNAVI 11373 12.09.2020
68 17131A0821IV
B.TECH.CHEM KALAKOTA SUJANA 11041 9.09.2020
69 17131A0822IV
B.TECH.CHEM KAMIREDDI SUNIL KUMAR 11431 14.09.2020
70 17131A0823IV
B.TECH.CHEM KAMMAKATTU VENKATASAI GANATANMAYTEJ REDDY 11309 12.09.2020
71 17131A0824IV
B.TECH.CHEM KAPPALA PAVAN PADMAJA 11557 15.09.2020
72 17131A0825IV
B.TECH.CHEM KARRI NAVEEN KUMAR 12701 5.10.2020
73 17131A0826IV
B.TECH.CHEM KATNAM RAMESH CHANDRA 12574 5.10.2020
74 17131A0827IV
B.TECH.CHEM KOLLURU VAMSY VAISHNAVI 11440 18.09.2020
75 17131A0830IV
B.TECH.CHEM K T SRI DURGA 12323 10.10.2020
76 17131A0831IV
B.TECH.CHEM KURUMADDALA SATYA SAI ANURUC 10920 11.09.2020
77 17131A0832IV
B.TECH.CHEM LAKSHMI SREEKAR BATCHU 10746 7.09.2020
78 17131A0833IV
B.TECH.CHEM LANDA BALASUBRAMANYAM 12131 19.09.2020
79 17131A0835IV
B.TECH.CHEM MATTUPALLI SAI SOUMYA SRI 10925 10.09.2020
80 17131A0837IV
B.TECH.CHEM M SAI KEERTHANA 12789 17.10.2020
81 17131A0839IV
B.TECH.CHEM P V S S S DINESH KUMAR 11850 15.09.2020
82 17131A0840IV
B.TECH.CHEM P. CHANDRA MOULI PRANAV 11909 14.09.2020
83 17131A0841IV
B.TECH.CHEM PALAKOLLU SATYA SAI VARUN KUMAR 12566 4.10.2020
84 17131A0842IV
B.TECH.CHEM PANIDARAPU TANMAI MANI 12689 30.09.2020
85 17131A0843IV
B.TECH.CHEM PAVAN KUMAR DAS 12539 6.10.2020
86 17131A0844IV
B.TECH.CHEM PETCHETTI AKHILA 12119 17.09.2020
87 17131A0846IV
B.TECH.CHEM REYYI PREETHI 12471 14.10.2020
88 17131A0847IV
B.TECH.CHEM SADHANALA SRILEKHA 12685 30.09.2020
89 17131A0848IV
B.TECH.CHEM SATTI SUBRAHMANYESWARA REDDY 10789 7.09.2020
90 17131A0850IV
B.TECH.CHEM SONGALA VIKAS 11444 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
91 17131A0851IV
B.TECH.CHEM SUDEEP KATAKAM 10932 10.09.2020
92 17131A0852IV
B.TECH.CHEM SURA HEMANTH 10917 9.09.2020
93 17131A0853IV
B.TECH.CHEM TAMMINENI PAVAN KUMAR 10781 7.09.2020
94 17131A0854IV
B.TECH.CHEM V.V. SAI HARISH 11363 12.09.2020
95 17131A0855IV
B.TECH.CHEM VEERUBHOTLA ANIL DATTA 12259 30.09.2020
96 17131A0856IV
B.TECH.CHEM VUNDI ANKITH 11988 14.09.2020
97 18135A0801IV
B.TECH.CHEM ADUSUMILLI SIVA RAM 12202 14.09.2020
98 18135A0802IV
B.TECH.CHEM AKKALA JAYA VENKATA SAI 12520 3.10.2020
99 18135A0804IV
B.TECH.CHEM GORLE NAVEEN 11219 12.09.2020
100 18135A0806IV
B.TECH.CHEM MAKKUVA BHAVYA 11271 16.09.2020
101 18135A0807IV
B.TECH.CHEM MOHAMMAD IBRAHIM BASHA 11037 9.09.2020
102 18135A0808IV
B.TECH.CHEM PALISETTI SRIKANTH 12178 27.09.2020
103 18135A0809IV
B.TECH.CHEM PARAVADA VENKATA VARAHA MAHADESH 11291 14.09.2020
104 18135A0810IV
B.TECH.CHEM PATRA ABRAHAM 11675 15.09.2020
105 18135A0811IV
B.TECH.CHEM PENIGADA BALASUBHRAMANYAM 11094 11.09.2020
106 18135A0812IV
B.TECH.CHEM SARAGADAM JYOTHSNA 12746 13.10.2020
107 18135A0813IV
B.TECH.CHEM TUMMALA POOJITHA 11858 15.09.2020
108 18135A0814IV
B.TECH.CHEM VASAPALLI TEJASWINI 12663 30.09.2020
109 17131A01B3III
B.TECH.CIVIL YEDUVAKA SAI PAVAN 12488 16.10.2020
110 18131A0101III
B.TECH.CIVIL AGGUNNA NIHARIKA 12738 5.10.2020
111 18131A0102III
B.TECH.CIVIL ALLAMSETTI DEVI PRASANNA 11859 15.09.2020
112 18131A0105III
B.TECH.CIVIL ATLURI LASYADHARANI 11338 13.09.2020
113 18131A0106III
B.TECH.CIVIL BALAGA RAMYA SRI 11503 15.09.2020
114 18131A0107III
B.TECH.CIVIL BANDANGI NAVEEN KUMAR 11288 14.09.2020
115 18131A0108III
B.TECH.CIVIL BHOGADI NIHARIKA 10754 8.09.2020
116 18131A0113III
B.TECH.CIVIL CHALAMALASETTY AVINASH VARDHAN 12702 5.10.2020
117 18131A0115III
B.TECH.CIVIL CHANDULAL NAIK DESAVATHU 12593 5.10.2020
118 18131A0116III
B.TECH.CIVIL CHAVATAPALLI ADISH 11335 13.09.2020
119 18131A0117III
B.TECH.CIVIL CHIPPADA RAVI PRASAD 11810 15.09.2020
120 18131A0121III
B.TECH.CIVIL DHAVALA BALAMURALI KRISHNA 12118 17.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
121 18131A0122III
B.TECH.CIVIL DUPPATLA HARISH 12020 14.09.2020
122 18131A0123III
B.TECH.CIVIL DUPPALAPUDI JHANSHI 11456 14.09.2020
123 18131A0124III
B.TECH.CIVIL EDIBILLI PREETHAM NAIDU 12778 15.10.2020
124 18131A0125III
B.TECH.CIVIL GADI DHANESH SIVASRI 12108 16.09.2020
125 18131A0126III
B.TECH.CIVIL GADIDESI SRAVANI 10991 13.09.2020
126 18131A0128III
B.TECH.CIVIL GOTTIMUKKALA ROHITH VARMA 12230 30.09.2020
127 18131A0129III
B.TECH.CIVIL GURUGUBELLI DYVIKA 11174 12.09.2020
128 18131A0130III
B.TECH.CIVIL GUNNAM RAVI 12596 5.10.2020
129 18131A0131III
B.TECH.CIVIL GUNNU SAI KUMAR 11650 15.09.2020
130 18131A0132III
B.TECH.CIVIL HEMANJALI ANAPARTHI 12285 30.09.2020
131 18131A0134III
B.TECH.CIVIL JAGIRDAR MANOJ PRADHYUMNA 11825 15.09.2020
132 18131A0136III
B.TECH.CIVIL KALLEPALLI SATYA VINEETH 11957 14.09.2020
133 18131A0138III
B.TECH.CIVIL KALLURI MANI PRADHYUM 12658 30.09.2020
134 18131A0139III
B.TECH.CIVIL KALYAN VARMA NUNNA 11353 12.09.2020
135 18131A0142III
B.TECH.CIVIL KOSARAJU SATYA TEJA 12313 10.10.2020
136 18131A0143III
B.TECH.CIVIL KARRI VENKATA RAKESH 11324 13.09.2020
137 18131A0144III
B.TECH.CIVIL KATE RAMYA 12625 30.09.2020
138 18131A0147III
B.TECH.CIVIL KELLI RAJANI 10990 13.09.2020
139 18131A0149III
B.TECH.CIVIL KETHAVATH RAMESH NAIK 11640 15.09.2020
140 18131A0150III
B.TECH.CIVIL KILLI ROSHAN 12669 30.09.2020
141 18131A0151III
B.TECH.CIVIL KILLARI JANARDHANA 12195 30.09.2020
142 18131A0152III
B.TECH.CIVIL KUCHIBHATLA A UMA JYOTHIRMAYEE 11899 28.09.2020
143 18131A0155III
B.TECH.CIVIL MADDULA MANOJ KUMAR 10743 7.09.2020
144 18131A0157III
B.TECH.CIVIL MAMILLAPALLI GANGA RAJU 12679 30.09.2020
145 18131A0160III
B.TECH.CIVIL MATTA LITESH 12589 5.10.2020
146 18131A0162III
B.TECH.CIVIL MODALAVALASA RAMMOHANA RAO 11114 10.09.2020
147 18131A0163III
B.TECH.CIVIL MOGILI CHARAN PAUL 12687 30.09.2020
148 18131A0165III
B.TECH.CIVIL MOOLA SHANMUK ESWARA SARMA 12248 30.09.2020
149 18131A0167III
B.TECH.CIVIL MUPPIDI AKASH 11090 10.09.2020
150 18131A0169III
B.TECH.CIVIL MURIKIPUDI SRAVANI 11534 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
151 18131A0171III
B.TECH.CIVIL NEELI NAGA ANJANEYULU 12737 5.10.2020
152 18131A0173III
B.TECH.CIVIL PAMIDIMURTHULA SRI HARSHA 12459 14.10.2020
153 18131A0174III
B.TECH.CIVIL PATTABHI VASUDHA 12214 18.09.2020
154 18131A0177III
B.TECH.CIVIL RAGIDI HARSHA VARDHAN 11613 15.09.2020
155 18131A0178III
B.TECH.CIVIL RAVIPALLI LOKESWARA SAI MANIKANTA 12923 16.10.2020
156 18131A0179III
B.TECH.CIVIL RAYAPAREDDY PADMAPOOJITHA 11849 15.09.2020
157 18131A0180III
B.TECH.CIVIL ROTTA TEJA 10719 31.08.2020
158 18131A0181III
B.TECH.CIVIL SADHANA VARMA DANTULURI 10923 10.09.2020
159 18131A0182III
B.TECH.CIVIL SAI HITESH KANTHETI 11314 12.09.2020
160 18131A0187III
B.TECH.CIVIL SATTURU VENKATA RAJA SEKHAR 10929 10.09.2020
161 18131A0188III
B.TECH.CIVIL SAVARA BHAGYASRI 12415 30.09.2020
162 18131A0189III
B.TECH.CIVIL SEEPANA PRAVEEN KUMAR 11275 16.09.2020
163 18131A0192III
B.TECH.CIVIL SIRIPURAPU RAMANJI 11748 15.09.2020
164 18131A0193III
B.TECH.CIVIL SIMHADRI LAHARI 11827 15.09.2020
165 18131A0194III
B.TECH.CIVIL SORNAPUDI V M D GAYATHRI 12142 28.09.2020
166 18131A0195III
B.TECH.CIVIL SRI PADA JAHNAVI RAJA SREE 11853 15.09.2020
167 18131A0197III
B.TECH.CIVIL SURISETTI KRISHNA MURTHY NAIDU 10760 4.09.2020
168 18131A0198III
B.TECH.CIVIL TAMMINENI MOUNIKA 11657 15.09.2020
169 18131A01A0III
B.TECH.CIVIL TANYA NUTTAKKI 12545 3.10.2020
170 18131A01A4III
B.TECH.CIVIL VANDRANGI SAAMAJA 12030 14.09.2020
171 18131A01A6III
B.TECH.CIVIL VELAMA SRINIVASA RAO 11156 11.09.2020
172 18131A01A8III
B.TECH.CIVIL VYZA GANESH REDDY 10937 12.09.2020
173 18131A01B1III
B.TECH.CIVIL MALIREDDY RAKESH REDDY 10996 13.09.2020
174 18131A01B2III
B.TECH.CIVIL PUTTA VENKATA SIVA SAI CHAITANYA 12731 5.10.2020
175 19135A0101III
B.TECH.CIVIL ALAMPURI YEDUKONDALU 12065 14.09.2020
176 19135A0102III
B.TECH.CIVIL BALUSUPATI MURALI 11747 15.09.2020
177 19135A0104III
B.TECH.CIVIL ETAKOTA VENKATA SATYA BHARATH 12008 14.09.2020
178 19135A0105III
B.TECH.CIVIL GANTA ANKITA 12598 5.10.2020
179 19135A0106III
B.TECH.CIVIL GUBBALA BHAVANI SHANKAR 12549 3.10.2020
180 19135A0109III
B.TECH.CIVIL KAPARAPU DIVYA 11622 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
181 19135A0110III
B.TECH.CIVIL KETAVATH RAJASHEKHAR NAIK 11753 15.09.2020
182 19135A0111III
B.TECH.CIVIL KOPPULA CHAITANYA KRISHNA 12117 17.09.2020
183 19135A0112III
B.TECH.CIVIL LEKKALA MANIKANTA 12026 14.09.2020
184 19135A0113III
B.TECH.CIVIL MADDU ARUN KUMAR 12206 14.09.2020
185 19135A0114III
B.TECH.CIVIL MADEM V V S ALEKHYA 12460 14.10.2020
186 19135A0115III
B.TECH.CIVIL MARUKURTHI VEERA BALA KISHORE 12006 14.09.2020
187 19135A0116III
B.TECH.CIVIL MENDRAGUTHI SUNIL 12186 25.09.2020
188 19135A0118III
B.TECH.CIVIL NALLABOTHULA VEERANJANEYULU 12161 24.09.2020
189 19135A0119III
B.TECH.CIVIL NERELLA VENKATA PRASANNA SAI SIDHARDHA 12406 30.09.2020
190 19135A0121III
B.TECH.CIVIL POTNURU TARUNI 11158 12.09.2020
191 19135A0122III
B.TECH.CIVIL S. SRIRAM 11802 15.09.2020
192 19135A0123III
B.TECH.CIVIL SHAIK BAJI BASHA 11727 15.09.2020
193 19135A0124III
B.TECH.CIVIL SIRUGUDI ANUSHA 12077 14.09.2020
194 19135A0125III
B.TECH.CIVIL SUGGUNA VENKATAARAVIND 12009 14.09.2020
195 19135A0126III
B.TECH.CIVIL TATAPUDI SANJEEV 11597 15.09.2020
196 15131A0137IV
B.TECH.CIVIL JANAPAREDDY VENKATA SANYASI NAIDU 12781 16.10.2020
197 17131A0102IV
B.TECH.CIVIL ALLU V CH S S J AKHIL 11380 13.09.2020
198 17131A0103IV
B.TECH.CIVIL ANEM SAICHANDRA TEJA 11934 14.09.2020
199 17131A0104IV
B.TECH.CIVIL ANGULURI RISHWANTH 10710 1.09.2020
200 17131A0105IV
B.TECH.CIVIL ANKAREDDI SAI RAJA KONDALA RAO 12592 5.10.2020
201 17131A0106IV
B.TECH.CIVIL ANNEPU JEEVAN KUMAR 10956 12.09.2020
202 17131A0110IV
B.TECH.CIVIL BALIVADA SAI SURAJ 11323 13.09.2020
203 17131A0112IV
B.TECH.CIVIL BODA HARI PRIYA 11776 15.09.2020
204 17131A0113IV
B.TECH.CIVIL BODAPATI AKHIL CHOWDARY 12591 5.10.2020
205 17131A0114IV
B.TECH.CIVIL BOLLA USHNEESH NANDAN 11926 14.09.2020
206 17131A0115IV
B.TECH.CIVIL BOMMANA SUMANTU 12181 26.09.2020
207 17131A0117IV
B.TECH.CIVIL BUGATHA VINAY 12464 14.10.2020
208 17131A0118IV
B.TECH.CIVIL CH. PURNA CHANDRA SEKHAR NAIDU 11885 28.09.2020
209 17131A0119IV
B.TECH.CIVIL CHARISHMA TUMMURI 12629 30.09.2020
210 17131A0121IV
B.TECH.CIVIL CHINTA LAKSHMI SAI SUPRIYA 11796 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
211 17131A0122IV
B.TECH.CIVIL D NAVEEN SURYA NARAYANA 12599 5.10.2020
212 17131A0123IV
B.TECH.CIVIL DASARI REETU SRI 11168 12.09.2020
213 17131A0125IV
B.TECH.CIVIL D MAHESH KUMAR KAMI REDDY 12763 7.10.2020
214 17131A0127IV
B.TECH.CIVIL GANNAVARAPU VENKATA NAGA SRI HARIKA 12587 5.10.2020
215 17131A0128IV
B.TECH.CIVIL GEDELA MADHAVANAIDU 12595 5.10.2020
216 17131A0129IV
B.TECH.CIVIL GHANDIKOTA LAKSHMI PRANAVI 11833 15.09.2020
217 17131A0130IV
B.TECH.CIVIL GUTHAVALLI RAJITHA 12761 6.10.2020
218 17131A0132IV
B.TECH.CIVIL INDUKURI NAGA MAHITHA 10959 14.09.2020
219 17131A0134IV
B.TECH.CIVIL JAGARAPU MOHAN VENKATESH 12249 30.09.2020
220 17131A0135IV
B.TECH.CIVIL JAGATSA SARAGADAM 10950 11.09.2020
221 17131A0137IV
B.TECH.CIVIL JANGAM SINDHU LAHARI 12271 30.09.2020
222 17131A0138IV
B.TECH.CIVIL JOKADA CHANDRA MOULI 11292 14.09.2020
223 17131A0140IV
B.TECH.CIVIL KADIYAM ANVESH BABU 11760 15.09.2020
224 17131A0141IV
B.TECH.CIVIL KALLURU JAGADEESH KUMAR 12472 14.10.2020
225 17131A0142IV
B.TECH.CIVIL KALVA JYOTHIKA 12676 30.09.2020
226 17131A0143IV
B.TECH.CIVIL KANDREGULA YASHO VARDHAN RAMAN 11867 15.09.2020
227 17131A0144IV
B.TECH.CIVIL KATAM ABHILASH 12465 14.10.2020
228 17131A0145IV
B.TECH.CIVIL KAVITI PAVANKALYAN 11405 14.09.2020
229 17131A0148IV
B.TECH.CIVIL KOILADA VENKATA HARISH 12526 3.10.2020
230 17131A0150IV
B.TECH.CIVIL KOMMANA SOMASEKHAR 12588 5.10.2020
231 17131A0151IV
B.TECH.CIVIL KONDAPALLI SAIRAHUL 11504 15.09.2020
232 17131A0152IV
B.TECH.CIVIL KOPPOLU RAJ KUMAR 12093 16.09.2020
233 17131A0153IV
B.TECH.CIVIL KORADA NAVEEN 10734 3.09.2020
234 17131A0154IV
B.TECH.CIVIL KOTTISA JAYANTH SRIRAM PATNAIK 12301 10.10.2020
235 17131A0156IV
B.TECH.CIVIL KRISHNA SAI KAUSHIK NIMMAKAYALA 12260 30.09.2020
236 17131A0158IV
B.TECH.CIVIL KUNISETTY SANATH LAKSHMI VEMA REDDY 12261 30.09.2020
237 17131A0159IV
B.TECH.CIVIL LADI ANKITH KUMAR 12580 5.10.2020
238 17131A0160IV
B.TECH.CIVIL LOLLA JYOTHIRMAYI 10753 8.09.2020
239 17131A0164IV
B.TECH.CIVIL M MANOHAR 12912 9.10.2020
240 17131A0165IV
B.TECH.CIVIL M NOOKA RAJU 10998 13.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
241 17131A0167IV
B.TECH.CIVIL MOHAMMED IBRAHIM 11997 29.09.2020
242 17131A0168IV
B.TECH.CIVIL MOSA SUDHEER KUMAR 11787 15.09.2020
243 17131A0170IV
B.TECH.CIVIL NAGISETTY RAVINDRA 11453 14.09.2020
244 17131A0171IV
B.TECH.CIVIL NALAM LAKSHMAN 11001 8.09.2020
245 17131A0173IV
B.TECH.CIVIL NETINTI LOKESH 11235 12.09.2020
246 17131A0175IV
B.TECH.CIVIL PAKAM BHAVYA ANJALI 11297 14.09.2020
247 17131A0177IV
B.TECH.CIVIL PANGI SANJAY 10772 5.09.2020
248 17131A0179IV
B.TECH.CIVIL PECHETTI RAM NARESH 11625 15.09.2020
249 17131A0180IV
B.TECH.CIVIL PECHETTI SUDHEER KUMAR 11471 14.09.2020
250 17131A0181IV
B.TECH.CIVIL PEDDAMARU RAGHURAM 12016 14.09.2020
251 17131A0182IV
B.TECH.CIVIL PEETA ARUN 11012 8.09.2020
252 17131A0183IV
B.TECH.CIVIL P AJAY SURYA 12568 4.10.2020
253 17131A0186IV
B.TECH.CIVIL REJETI SANJAY KUMAR 12160 24.09.2020
254 17131A0187IV
B.TECH.CIVIL RONGALA SAI DIVYA 12141 21.09.2020
255 17131A0189IV
B.TECH.CIVIL SAI TUSHAR SAMBHARA 12250 30.09.2020
256 17131A0190IV
B.TECH.CIVIL SAINI VENKATESH 12167 28.09.2020
257 17131A0191IV
B.TECH.CIVIL SARIDEVI KRISHNA CHAND 11927 14.09.2020
258 17131A0192IV
B.TECH.CIVIL S V SAI SRAVAN 10928 10.09.2020
259 17131A0193IV
B.TECH.CIVIL SAVARAPU UDAY KIRAN BENARJEE 12304 10.10.2020
260 17131A0194IV
B.TECH.CIVIL SEEPANA SUSHANTH 11876 15.09.2020
261 17131A0196IV
B.TECH.CIVIL SHAIK AFROZBASHA 12585 5.10.2020
262 17131A0197IV
B.TECH.CIVIL S SREEDHAR 12015 14.09.2020
263 17131A0199IV
B.TECH.CIVIL TADI SAI TEJESH REDDY 11879 15.09.2020
264 17131A01A1IV
B.TECH.CIVIL TAMARBA LAKSHMI POOJA 11989 14.09.2020
265 17131A01A3IV
B.TECH.CIVIL TIPPABHOTLA SRIRAM 12298 30.09.2020
266 17131A01A4IV
B.TECH.CIVIL UDANDARAO LIKHITA 11790 15.09.2020
267 17131A01A7IV
B.TECH.CIVIL V DHARANI KUMARI 11000 13.09.2020
268 17131A01A9IV
B.TECH.CIVIL VARANASI VAISHNAVI 12713 5.10.2020
269 17131A01B0IV
B.TECH.CIVIL VENKUMAHANTHI ANIL KUMAR 11365 12.09.2020
270 17131A01B2IV
B.TECH.CIVIL VUPPUTURI YAGNESWAR NIKHIL 10978 13.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
271 18135A0102IV
B.TECH.CIVIL ADDALA TARUN SRI SATYA KUMAR 12677 30.09.2020
272 18135A0107IV
B.TECH.CIVIL CHALLA SRINI VASA RAO 11749 15.09.2020
273 18135A0110IV
B.TECH.CIVIL JAGADISH MEDEPALLI 12683 30.09.2020
274 18135A0115IV
B.TECH.CIVIL MATTAPARTHI SRAVANTHI 5.10.2020
275 18135A0116IV
B.TECH.CIVIL MATTURTHI RANGAVARA SAI CHAITANYA 11061 9.09.2020
276 18135A0118IV
B.TECH.CIVIL PATNALA MOUNIKA 11209 12.09.2020
277 18135A0120IV
B.TECH.CIVIL SATTI SITARATHNAM 11330 13.09.2020
278 18135A0122IV
B.TECH.CIVIL SHAIK KAMOOSH BABA 11494 14.09.2020
279 18135A0125IV
B.TECH.CIVIL TARAPATLA SRAVANTHI 11842 15.09.2020
280 18135A0127IV
B.TECH.CIVIL YANNAMSETTI POORNA CHANDRASWAMY 10984 13.09.2020
281 18135A0128IV
B.TECH.CIVIL YAVVARI SAIKUMAR 12012 14.09.2020
282 16131A0599III
B.TECH.CSE KARRY SANANH VARMA 11306 12.09.2020
283 18131A0501III
B.TECH.CSE ACHALLA BINDU PRIYANKA 11047 9.09.2020
284 18131A0502III
B.TECH.CSE AKULA UDAY SANDEEP 10979 13.09.2020
285 18131A0503III
B.TECH.CSE ALLADA VEERA MANIKANTA KUMAR 12210 14.09.2020
286 18131A0504III
B.TECH.CSE AMMIREDDY LEELA BHARGAV 11034 9.09.2020
287 18131A0506III
B.TECH.CSE AMUDALAPALLI HEMANTH 11192 12.09.2020
288 18131A0509III
B.TECH.CSE ANNAPAREDDY NAVYA SRI 11389 14.09.2020
289 18131A0510III
B.TECH.CSE AZHIKKAGATH THERESA SUSMITHA 11413 14.09.2020
290 18131A0511III
B.TECH.CSE BABY BHAVANA PITCHIKA 11455 14.09.2020
291 18131A0512III
B.TECH.CSE BADE SAI CHANDANA 12632 30.09.2020
292 18131A0513III
B.TECH.CSE BADIYA SIRISHA 12608 30.09.2020
293 18131A0514III
B.TECH.CSE BAGADI HARIKA 11715 15.09.2020
294 18131A0515III
B.TECH.CSE BAKI JOHN WESLEY 11232 12.09.2020
295 18131A0516III
B.TECH.CSE TODETI BHARGAVI 12528 3.10.2020
296 18131A0518III
B.TECH.CSE BANAVATHU LAKSHMAN NAIK 10993 13.09.2020
297 18131A0519III
B.TECH.CSE UPPELA CHANDRA SEKHAR REDDY 11191 12.09.2020
298 18131A0521III
B.TECH.CSE BHERI SRI NAGA RATNA SAMEERA 11125 11.09.2020
299 18131A0522III
B.TECH.CSE BHUKYA PADMAVATHI 12606 30.09.2020
300 18131A0524III
B.TECH.CSE BITRAGUNTA VENKATA SAI VIJAYA ADITYA 12605 30.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
301 18131A0528III
B.TECH.CSE BALRAMMAHANTHI VIKASH 11893 28.09.2020
302 18131A0529III
B.TECH.CSE CHIPPADA JAGADEESWARI SRI SRAVANI 12076 14.09.2020
303 18131A0531III
B.TECH.CSE CHIRUKURI BHAGYA SRI 11958 14.09.2020
304 18131A0532III
B.TECH.CSE CHITTA VENKATA NAGA VINAY 10769 5.09.2020
305 18131A0535III
B.TECH.CSE DANTULURI SAI SRUTHIKA RAJU 12121 17.09.2020
306 18131A0536III
B.TECH.CSE DASARI SHANMUKHA CHARAN 11953 14.09.2020
307 18131A0537III
B.TECH.CSE DATLA V S S KIRAN VARMA 11039 9.09.2020
308 18131A0538III
B.TECH.CSE DEVADASU SAI SATHWIK 11351 12.09.2020
309 18131A0539III
B.TECH.CSE DHARKSHAN SAHIL KUMAR 11678 15.09.2020
310 18131A0540III
B.TECH.CSE DODDI RAMESH 11154 11.09.2020
311 18131A0541III
B.TECH.CSE DODDI VENKATA SAI 10736 3.09.2020
312 18131A0542III
B.TECH.CSE DOMMETI VENKATA SREEMANOJ 10931 10.09.2020
313 18131A0543III
B.TECH.CSE DWIBHASHI ATUL 11189 14.09.2020
314 18131A0544III
B.TECH.CSE DURGAM ANIRUDH 11540 15.09.2020
315 18131A0545III
B.TECH.CSE GADDE SUDHEER 11466 14.09.2020
316 18131A0546III
B.TECH.CSE GANDEPALLI BHANU SANJAY 11056 9.09.2020
317 18131A0547III
B.TECH.CSE GANESH SAI RAGHAV NURUKURTI 12288 30.09.2020
318 18131A0548III
B.TECH.CSE GARIMELLA V S PRANEETHA 12278 30.09.2020
319 18131A0549III
B.TECH.CSE GODA KRISHNA VENI 11483 14.09.2020
320 18131A0550III
B.TECH.CSE GONAMANDA LALITH KUMAR 12670 30.09.2020
321 18131A0551III
B.TECH.CSE GORAPALLI HEMANTH 11832 15.09.2020
322 18131A0552III
B.TECH.CSE GORLA GAYATRI NEELIMA CHINMY 11489 14.09.2020
323 18131A0553III
B.TECH.CSE GORTHI SASANKA GEETANATH 11828 15.09.2020
324 18131A0555III
B.TECH.CSE GUDIMETLA VENKATA DILEEP REDDY 11382 13.09.2020
325 18131A0556III
B.TECH.CSE GUDIVADA ROJA 12247 30.09.2020
326 18131A0557III
B.TECH.CSE GUDURI SAI NIKHIL 12627 30.09.2020
327 18131A0558III
B.TECH.CSE GUNNAM GIRISWAR 12264 30.09.2020
328 18131A0559III
B.TECH.CSE GUTHULA TEJASWINI 11652 15.09.2020
329 18131A0563III
B.TECH.CSE JADDADA LIKHITHA 12784 12106 16.09.2020
330 18131A0564III
B.TECH.CSE JAKKULA SRI HARSHA 11661 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
331 18131A0566III
B.TECH.CSE JELDI DAVID RAJU 11663 15.09.2020
332 18131A0567III
B.TECH.CSE JUJJAVARAPU SATYA GEETHIKA 11911 14.09.2020
333 18131A0568III
B.TECH.CSE JUNJURU RAVI KUMAR 11728 15.09.2020
334 18131A0570III
B.TECH.CSE KALAPALA VENKATA SUNDEEP 11215 14.09.2020
335 18131A0572III
B.TECH.CSE KAMBHAMPATI VANDAN KUMAR 12639 30.09.2020
336 18131A0577III
B.TECH.CSE KELLA YASASWINI 12636 30.09.2020
337 18131A0578III
B.TECH.CSE KHANDADEVILI BAIRISHITTI ANISH 11816 15.09.2020
338 18131A0579III
B.TECH.CSE KILLI BHUVANA SRI 11165 12.09.2020
339 18131A0582III
B.TECH.CSE KODALI MAHENDRA 11704 15.09.2020
340 18131A0583III
B.TECH.CSE KODURI SRI HARSHA VARDHAN 12177 28.09.2020
341 18131A0584III
B.TECH.CSE KOGANTI SAI NARENDRA 11528 15.09.2020
342 18131A0585III
B.TECH.CSE KOLLURI NAGA VENKATA SAI SRI MEGHANA 11106 10.09.2020
343 18131A0586III
B.TECH.CSE KONDAKA OMKAR 12581 5.10.2020
344 18131A0587III
B.TECH.CSE KONERU LAHARI 10945 11.09.2020
345 18131A0589III
B.TECH.CSE KOTHA GOPI PRASANNA VENKATA MANIDEEP 11107 10.09.2020
346 18131A0590III
B.TECH.CSE KOVIRI SUSHMA MADHAVI 11115 10.09.2020
347 18131A0592III
B.TECH.CSE LAKKIMSETTI ANUPAM 12469 14.10.2020
348 18131A0593III
B.TECH.CSE LAKKIMSETTI SUJITH 12200 30.09.2020
349 18131A0596III
B.TECH.CSE LOKIREDDY VENKATA SAIADINARAYANA REDDY 12124 17.09.2020
350 18131A0597III
B.TECH.CSE MACHARLA RAMA SAHITHI 12515 2.10.2020
351 18131A0598III
B.TECH.CSE MAHANTHI TEJESWARA RAO 11644 15.09.2020
352 18131A05A0III
B.TECH.CSE MALIREDDI SINDHU PRIYA 11856 15.09.2020
353 18131A05A1III
B.TECH.CSE MALLIPUDI SANGEETHA 12144 21.09.2020
354 18131A05A2III
B.TECH.CSE MANAM AJITH 12925 14.10.2020
355 18131A05A3III
B.TECH.CSE MANCHIKALAPUDI APARNA 11135 11.09.2020
356 18131A05A5III
B.TECH.CSE MANTRI TEJASWI 11936 22.09.2020
357 18131A05A6III
B.TECH.CSE MARADA PAVAN 12292 30.09.2020
358 18131A05A7III
B.TECH.CSE MAVURI AMRUTHA VARSHINI 11151 11.09.2020
359 18131A05A9III
B.TECH.CSE MITTIREDDY PRAVALLIKA 11731 15.09.2020
360 18131A05B3III
B.TECH.CSE MOUNIKA DEVI NALLAPA RAJU 11045 9.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
361 18131A05B5III
B.TECH.CSE MULAKALA NAVEEN 11567 15.09.2020
362 18131A05B6III
B.TECH.CSE MUNNALURU GEETA JAYANTH 12749 6.10.2020
363 18131A05B8III
B.TECH.CSE MYLAPILLI NIRANJANI 12550 3.10.2020
364 18131A05B9III
B.TECH.CSE NAKKA VENKATA VIJAYA ABHIGNA 11836 15.09.2020
365 18131A05C0III
B.TECH.CSE NAIDU HARSHINI VIJAYA MAHITHA 10962 12.09.2020
366 18131A05C1III
B.TECH.CSE NALLAMILLI DEVI SAI VINEETHA 12132 19.09.2020
367 18131A05C2III
B.TECH.CSE NANDULA JYOTHI KRUTHIKA 12779 15.09.2020
368 18131A05C4III
B.TECH.CSE NITIN CHAKRAVARTHY CHILUKURI 11937 14.09.2020
369 18131A05C5III
B.TECH.CSE OGGU SAI MANI TEJA 11666 15.09.2020
370 18131A05C6III
B.TECH.CSE ONTERU NAGARAJU 12037 14.09.2020
371 18131A05C7III
B.TECH.CSE P.V. SUBRAHMANYA SRI VAIBHAV 12741 5.10.2020
372 18131A05D0III
B.TECH.CSE PALLAPROLU HANIMI REDDY 12176 28.09.2020
373 18131A05D2III
B.TECH.CSE PALLI PRANATHI NAGA SAI 11409 14.09.2020
374 18131A05D3III
B.TECH.CSE PALLI VAMSI KRISHNA 12050 14.09.2020
375 18131A05D4III
B.TECH.CSE PANTULA NAGA SIDHARTH 11978 14.09.2020
376 18131A05D5III
B.TECH.CSE PATTAMSETTI ANURAG 11319 13.09.2020
377 18131A05D6III
B.TECH.CSE PATHAN RIYAZ 12014 14.09.2020
378 18131A05D7III
B.TECH.CSE PEETHALA SANTHOSH SRINIVAS ESWAR 10953 11.09.2020
379 18131A05D8III
B.TECH.CSE PEKETI CHANDRA VAMSI SEKHAR 11328 13.09.2020
380 18131A05E0III
B.TECH.CSE PERAPATRUNI ABHI RAM 11948 14.09.2020
381 18131A05E1III
B.TECH.CSE PERI SOMESWARI DEEPIKA 10750 8.09.2020
382 18131A05E3III
B.TECH.CSE PUSARLA SOWKHYA 10977 13.09.2020
383 18131A05E4III
B.TECH.CSE RACHAMALLA CHARAN REDDY 10975 13.09.2020
384 18131A05E5III
B.TECH.CSE RAVADA SAI VENKATESH 10976 13.09.2020
385 18131A05E6III
B.TECH.CSE REDDY CHESHIKA 11272 16.09.2020
386 18131A05E9III
B.TECH.CSE RESHMA SRI LABBA 12600 5.10.2020
387 18131A05F0III
B.TECH.CSE SAI SREE G 11318 12.09.2020
388 18131A05F1III
B.TECH.CSE SAI SANTHOSH VELUGULA 11965 14.09.2020
389 18131A05F2III
B.TECH.CSE SAGI SAI CHAITANYA 12901 8.10.2020
390 18131A05F4III
B.TECH.CSE SAMBANGIJAGGANNAGARI RAVI TEJA 11662 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
391 18131A05F5III
B.TECH.CSE SAI SREE KAKOLLU 11669 15.09.2020
392 18131A05F6III
B.TECH.CSE SANGANA ADITYA SIVA PAVAN KUMAR 11930 14.09.2020
393 18131A05F7III
B.TECH.CSE SARAVANI NEMANI 10922 10.09.2020
394 18131A05F8III
B.TECH.CSE SATYAVOLU SAHITI 11381 13.09.2020
395 18131A05F9III
B.TECH.CSE SAVARA KALYAN 10930 10.09.2020
396 18131A05G0III
B.TECH.CSE SEELAM DIVYA BHAVANI 11986 14.09.2020
397 18131A05G1III
B.TECH.CSE SEERAM HARI PALLAVI 11421 14.09.2020
398 18131A05G2III
B.TECH.CSE SEERAPU TEJESWAR REDDY 11481 14.09.2020
399 18131A05G3III
B.TECH.CSE SESETTI SRI VENKATESH 11321 13.09.2020
400 18131A05G4III
B.TECH.CSE SHAIK ALFAAZ 11320 13.09.2020
401 18131A05G7III
B.TECH.CSE SHAIK MEERA MOHIDDIN 12079 14.09.2020
402 18131A05G8III
B.TECH.CSE SHAIK MOHAMMADVASEEM 11630 15.09.2020
403 18131A05G9III
B.TECH.CSE SIMHADRI TILAK TEJA 12262 30.09.2020
404 18131A05H0III
B.TECH.CSE SIRIKI EESHANYA SAI 11987 14.09.2020
405 18131A05H2III
B.TECH.CSE SHAIK NASIHA KOWSAR 11559 15.09.2020
406 18131A05H5III
B.TECH.CSE SRUTHI SUDHEER 11398 14.09.2020
407 18131A05H6III
B.TECH.CSE SUDEEP SIRRA 12080 14.09.2020
408 18131A05H7III
B.TECH.CSE KANCHANA SNIGDHA 12678 30.09.2020
409 18131A05H8III
B.TECH.CSE TEEGALA VENKATA NAGA SAI ACHUTA RAMAIAH 11188 12.09.2020
410 18131A05H9III
B.TECH.CSE THOTA UMA MAHESWARARAO 11216 12.09.2020
411 18131A05I0III
B.TECH.CSE THUMU SIVA SANKAR REDDY 11532 15.09.2020
412 18131A05I1III
B.TECH.CSE TIRUNAGARI DHARMA MITHRA 11801 15.09.2020
413 18131A05I2III
B.TECH.CSE BATHULA ASHIK 12674 30.09.2020
414 18131A05I3III
B.TECH.CSE TONTEPU VYSHALI 11970 14.09.2020
415 18131A05I4III
B.TECH.CSE TUMMALA MADHURIMA 11276 14.09.2020
416 18131A05I5III
B.TECH.CSE TUMMALA VEERA NAGA MAHIMA 11794 15.09.2020
417 18131A05I6III
B.TECH.CSE UNGATA BHARGAVA 11882 15.09.2020
418 18131A05I7III
B.TECH.CSE BAMMIDI NITHIN KUMAR 11197 12.09.2020
419 18131A05I9III
B.TECH.CSE UDAMALA GOWTHAMI DEVI 12410 30.09.2020
420 18131A05J0III
B.TECH.CSE VADDADI LALITHANJALI 11403 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
421 18131A05J1III
B.TECH.CSE VAJJHALA SURYA TEJA 10952 11.09.2020
422 18131A05J2III
B.TECH.CSE VALASAPALLI NAGA CHANDRIKA SRAVANI 10915 9.09.2020
423 18131A05J3III
B.TECH.CSE VARANASI VENKATA SURYA SRI HARSHA 11218 12.09.2020
424 18131A05J4III
B.TECH.CSE VARDHINEEDI DEEPTHI SATYA PRASANTHI 11258 16.09.2020
425 18131A05J6III
B.TECH.CSE VASAVI UPPALA 11334 13.09.2020
426 18131A05J8III
B.TECH.CSE VISWANADHAPALLI VIVEK SAI 11043 9.09.2020
427 18131A05K0III
B.TECH.CSE VILAK MOHAMMAD MOHIDDEEN 12201 14.09.2020
428 18131A05K1III
B.TECH.CSE VIRIGINENI SRAVYA SRI 11026 9.09.2020
429 18131A05K2III
B.TECH.CSE VEERAMALLA VAISHNAVI 12046 14.09.2020
430 18131A05K3III
B.TECH.CSE VOONNA HIMA BINDU 12456 14.10.2020
431 18131A05K4III
B.TECH.CSE VOONNA MANIDEEP 11990 14.09.2020
432 18131A05K5III
B.TECH.CSE YASHWANTH RAJ GARA 11861 15.09.2020
433 18131A05K6III
B.TECH.CSE YERRAGUNTA JAYASREE SUSHMA 11918 14.09.2020
434 18131A05L3III
B.TECH.CSE AMARA NAGAJAHANAVI 12696 30.09.2020
435 18131A05L5III
B.TECH.CSE ANOYSA ROUT 11884 28.09.2020
436 18131A05L8III
B.TECH.CSE CHILAKAMARTHI VISHNU PRIYA 12626 30.09.2020
437 18131A05M0III
B.TECH.CSE DARSI SAI VAMSI BHARADVAJA 12563 4.10.2020
438 18131A05M1III
B.TECH.CSE DEVELLA NITIN 11024 9.09.2020
439 18131A05M2III
B.TECH.CSE JAMI VINEESHA 11128 11.09.2020
440 18131A05M3III
B.TECH.CSE KALAGA VENKATA SREE MANASA 12268 30.09.2020
441 18131A05M4III
B.TECH.CSE KANITHI OLIVIA SHARON 11414 16.09.2020
442 18131A05M5III
B.TECH.CSE KOLLURI ROHITH 12420 30.9.2020
443 18131A05M6III
B.TECH.CSE KOTHAKOTA VISWANADH 11066 9.09.2020
444 18131A05M7III
B.TECH.CSE KRISHNA SINDHU KARRI 11817 15.09.2020
445 18131A05M8III
B.TECH.CSE LAKINENI SANDEEP 11359 12.09.2020
446 18131A05N1III
B.TECH.CSE MENTE SANDEEP 10745 7.09.2020
447 18131A05N2III
B.TECH.CSE MONDI VAMSI KRISHNA 12906 8.10.2020
448 18131A05N3III
B.TECH.CSE NIMISHAKAVI LAKSHMI AVANTHIKA 11807 15.09.2020
449 18131A05N4III
B.TECH.CSE PADALA BHAVANA 11929 21.09.2020
450 18131A05N5III
B.TECH.CSE PATTIKA CHARITHA 12470 14.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
451 18131A05N6III
B.TECH.CSE PECHETTI LAKSHMI MEGHANA 12267 30.09.2020
452 18131A05N7III
B.TECH.CSE PENKE VIVEK RAJ 12717 5.10.2020
453 18131A05N8III
B.TECH.CSE POTNURI SAI SUSHMITHA 12905 8.10.2020
454 18131A05N9III
B.TECH.CSE RUNKANA JOSTHANA 11169 12.09.2020
455 18131A05P3III
B.TECH.CSE VENKAT ANUJ DASAMANTHARAO 11361 12.09.2020
456 19135A0501III
B.TECH.CSE BATCHU SATYA DEV 11230 12.09.2020
457 19135A0502III
B.TECH.CSE BOLLIKONDA GAYATHRI 11513 15.09.2020
458 19135A0503III
B.TECH.CSE BUSALA MAHENDRA AVINASH 11688 15.09.2020
459 19135A0504III
B.TECH.CSE CHADUVULA SAGAR 10969 13.09.2020
460 19135A0505III
B.TECH.CSE DADDANALA KALESWARA MANIKANTA 11332 13.09.2020
461 19135A0506III
B.TECH.CSE DONGALA ANIL KUMAR 11514 15.09.2020
462 19135A0507III
B.TECH.CSE JARUGUBILLI SRI KRISHNA 10997 13.09.2020
463 19135A0509III
B.TECH.CSE KARIBANDI YUGADEEP 12782 15.09.2020
464 19135A0510III
B.TECH.CSE KOMMARI SUSHMA 11065 9.09.2020
465 19135A0511III
B.TECH.CSE KOTTIYADA SWATHI 11033 9.09.2020
466 19135A0512III
B.TECH.CSE MALLAPARAPU CHINA NAGARAJU 11539 15.09.2020
467 19135A0513III
B.TECH.CSE NELLI TULASI 11450 14.09.2020
468 19135A0514III
B.TECH.CSE NINDRA GURUNADHAM 12095 16.09.2020
469 19135A0515III
B.TECH.CSE PONGA THANUSHA RANI 12048 14.09.2020
470 19135A0516III
B.TECH.CSE POTHINA BHAVANA 11446 14.09.2020
471 19135A0517III
B.TECH.CSE RAVI PRANEETHA 11228 12.09.2020
472 19135A0518III
B.TECH.CSE VAJJA DILEEP KUMAR 11222 12.09.2020
473 19135A0519III
B.TECH.CSE VALLABHADASU PREETHI 11231 12.09.2020
474 19135A0520III
B.TECH.CSE VANGALAPUDI NIRMALA JYOTHI 11343 13.09.2020
475 19135A0521III
B.TECH.CSE VANKADARA PAVAN SUMANTH 11668 15.09.2020
476 19135A0522III
B.TECH.CSE VATRAPU PAVAN SAI 11634 15.09.2020
477 19135A0523III
B.TECH.CSE VEERAMALLA SAI MANOJ 11779 15.09.2020
478 19135A0524III
B.TECH.CSE REDDI JAGADEESWARA RAO 12565 4.10.2020
479 16131A0518IV
B.TECH.CSE A BALASUBRAHMANYAM 11354 12.09.2020
480 16131A05D1IV
B.TECH.CSE MAJJI VIVEK BHUSHAN 12146 21.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
481 17131A0502IV
B.TECH.CSE ACHALLA ABHI 11399 14.09.2020
482 17131A0503IV
B.TECH.CSE ACHANTA RAJ MOHAN 11008 8.09.2020
483 17131A0504IV
B.TECH.CSE ADAPA CHAITHANYA 12758 6.10.2020
484 17131A0505IV
B.TECH.CSE ADAPA PRANATHI 12242 30.09.2020
485 17131A0509IV
B.TECH.CSE AKELLA PRANAV 11938 14.09.2020
486 17131A0510IV
B.TECH.CSE AKKIREDDI MEGHANA 11152 11.09.2020
487 17131A0511IV
B.TECH.CSE AKKUMAHANTHI KRANTHI KIRAN 11512 15.09.2020
488 17131A0512IV
B.TECH.CSE AKULA SAI SUMANTH 12735 5.10.2020
489 17131A0513IV
B.TECH.CSE AKULA TARAKA MANI RAVI TEJA 12544 3.10.2020
490 17131A0514IV
B.TECH.CSE ALLURI DHATRI SRI 11628 15.09.2020
491 17131A0516IV
B.TECH.CSE ANNAM SAI NANDHINI PRASANNA 10938 12.09.2020
492 17131A0517IV
B.TECH.CSE ANNEPU DIVAKARA RAO 11445 14.09.2020
493 17131A0518IV
B.TECH.CSE ARAVAPALLI ANILKUMAR 11206 12.09.2020
494 17131A0519IV
B.TECH.CSE AREMANDA PREM SAGAR 12187 25.09.2020
495 17131A0521IV
B.TECH.CSE BADUGU PRAKASH 11615 15.09.2020
496 17131A0523IV
B.TECH.CSE BANGARU G V L SRI LAHARI 10983 13.09.2020
497 17131A0524IV
B.TECH.CSE BEHARA SAI KISHORE 11866 15.09.2020
498 17131A0526IV
B.TECH.CSE BHOGAVALLI SAI AISWARYA 12321 10.10.2020
499 17131A0527IV
B.TECH.CSE BOJANKI MANO RACHNA 10708 1.09.2020
500 17131A0528IV
B.TECH.CSE BUDATI VENKATA SIVA KUMAR 12577 5.10.2020
501 17131A0529IV
B.TECH.CSE BURLA SRUTHI 10771 5.09.2020
502 17131A0530IV
B.TECH.CSE BUTHUKURI SITA RAMI REDDY 11576 15.09.2020
503 17131A0531IV
B.TECH.CSE CHAGANTI SAI PAVANI 10779 7.09.2020
504 17131A0532IV
B.TECH.CSE CHEELA NIKHILA 11834 15.09.2020
505 17131A0534IV
B.TECH.CSE CHINNI JAI SAI UMA VENKATA TRIMURTHULU 11433 14.09.2020
506 17131A0535IV
B.TECH.CSE CHINTA ABHINAV 12567 4.10.2020
507 17131A0537IV
B.TECH.CSE CHIPPADA JAGADEESH KUMAR 11436 14.09.2020
508 17131A0538IV
B.TECH.CSE SAI HARSHINEE CHITTI 11377 13.09.2020
509 17131A0541IV
B.TECH.CSE DANDI MANIKANTHA 11680 15.09.2020
510 17131A0542IV
B.TECH.CSE DANGETI MEGHANA 12564 4.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
511 17131A0543IV
B.TECH.CSE DASARI SANJAY KUMAR 10946 11.09.2020
512 17131A0545IV
B.TECH.CSE DIDLA VINAY KUMAR 11638 15.09.2020
513 17131A0546IV
B.TECH.CSE DINTAKURTI SAI MANOJ 11023 9.09.2020
514 17131A0547IV
B.TECH.CSE DIVILI V V D SAI KISHORE 11520 15.09.2020
515 17131A0550IV
B.TECH.CSE DUVVU VASU 12594 5.10.2020
516 17131A0551IV
B.TECH.CSE DWARAMPUDI PUSHPALATHA 12283 30.09.2020
517 17131A0552IV
B.TECH.CSE G YOGABHIRAM 11758 15.09.2020
518 17131A0553IV
B.TECH.CSE GANDI PRAVEEN 11619 15.09.2020
519 17131A0554IV
B.TECH.CSE GANESH GUTTI 10906 10.09.2020
520 17131A0555IV
B.TECH.CSE GANGISETTI KAVYA SNIGDHA 11368 12.09.2020
521 17131A0558IV
B.TECH.CSE GATTIDI SAIDEEPAK 11342 13.09.2020
522 17131A0559IV
B.TECH.CSE GIDUTURI VANDANA 11524 15.09.2020
523 17131A0560IV
B.TECH.CSE G. BABA SIVA SRIRAM 12517 2.10.2020
524 17131A0561IV
B.TECH.CSE GARIKIPATI AVINASH 11973 14.09.2020
525 17131A0563IV
B.TECH.CSE GONELLA SUSHMA PRIYANKA 11378 13.09.2020
526 17131A0564IV
B.TECH.CSE GORLE SRIVANI 12706 5.10.2020
527 17131A0565IV
B.TECH.CSE GUDIMETLA SATYA SAI JAYANTH 11495 14.09.2020
528 17131A0566IV
B.TECH.CSE GUDIMETLA SURYA VENKATA HARI PRIYA 11412 14.09.2020
529 17131A0568IV
B.TECH.CSE GUNJA NAMRATHA 11939 14.09.2020
530 17131A0570IV
B.TECH.CSE HARI HITAKSH 12418 30.9.2020
531 17131A0572IV
B.TECH.CSE ILLINDA HEMANTH 12189 30.09.2020
532 17131A0573IV
B.TECH.CSE INTI HINEETH 11254 15.09.2020
533 17131A0574IV
B.TECH.CSE JAGARAPU ROSHINI 11590 15.09.2020
534 17131A0576IV
B.TECH.CSE JAHNAVI NARINDI 11357 12.09.2020
535 17131A0577IV
B.TECH.CSE JAHNAVI SANJANA PATNALA 11976 14.09.2020
536 17131A0578IV
B.TECH.CSE JAKILANKI RAHUL 12111 16.09.2020
537 17131A0579IV
B.TECH.CSE JAMI ALEKHYA 12725 5.10.2020
538 17131A0581IV
B.TECH.CSE J. SAI ANJANA SUSHMA 11051 9.09.2020
539 17131A0583IV
B.TECH.CSE K. LALITHA SAI PRIYA 11946 14.09.2020
540 17131A0584IV
B.TECH.CSE K. TARUN KUMAR 12512 1.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
541 17131A0585IV
B.TECH.CSE K MADHULATHA 11701 15.09.2020
542 17131A0586IV
B.TECH.CSE KALIGITHI SUBHANKAR 10751 8.09.2020
543 17131A0587IV
B.TECH.CSE KALLAM UDAYKANTHREDDY 10963 13.09.2020
544 17131A0588IV
B.TECH.CSE KAMAL PREETAM CHITTULURI 12228 30.09.2020
545 17131A0589IV
B.TECH.CSE KANTIMAHANTI SAI PRASANNA KUMAR 11991 14.09.2020
546 17131A0590IV
B.TECH.CSE KARANAM SATYA KEERTHI 12051 14.09.2020
547 17131A0591IV
B.TECH.CSE KARI VIJAYA 11647 15.09.2020
548 17131A0594IV
B.TECH.CSE KASETTI SOWMYA GRACE 12583 5.10.2020
549 17131A0595IV
B.TECH.CSE KASINA LAKSHMI SATYA MANIKANTA 11623 15.09.2020
550 17131A0596IV
B.TECH.CSE KATKAR PRIYANKA 12557 4.10.2020
551 17131A0598IV
B.TECH.CSE KELLA SAI TEJA KUMAR 12042 14.09.2020
552 17131A05A1IV
B.TECH.CSE KINTALI LALITHA PRANAVI 12739 5.10.2020
553 17131A05A2IV
B.TECH.CSE KOIDALA VEERA VENKATA SATYA SAI 12002 14.09.2020
554 17131A05A3IV
B.TECH.CSE KOLIPAKA HARIKA 10726 3.09.2020
555 17131A05A4IV
B.TECH.CSE KOLIPAKA TEJA 11551 15.09.2020
556 17131A05A6IV
B.TECH.CSE KOMMA SRI VAMSI MANOHAR 12067 14.09.2020
557 17131A05B1IV
B.TECH.CSE KOTAPATI MAHENDRA 10972 13.09.2020
558 17131A05B3IV
B.TECH.CSE KOTTE MOHAN BABU 12527 3.10.2020
559 17131A05B4IV
B.TECH.CSE KOVVURI SATYANARAYANA REDDY 11692 15.09.2020
560 17131A05B5IV
B.TECH.CSE KUNA RUSHI 11682 15.09.2020
561 17131A05B6IV
B.TECH.CSE KUNDRAPU SARANYA 11584 15.09.2020
562 17131A05B7IV
B.TECH.CSE KURLI VINEETHA 11971 14.09.2020
563 17131A05B9IV
B.TECH.CSE LINGAM SAI GOUTHAM 12056 14.09.2020
564 17131A05C0IV
B.TECH.CSE MAHANTHI SUSHMA ROY 11684 15.09.2020
565 17131A05C1IV
B.TECH.CSE MAJJI BHARGAV 12305 10.10.2020
566 17131A05C2IV
B.TECH.CSE MANDA VAMSI 11492 14.09.2020
567 17131A05C8IV
B.TECH.CSE MARRI PAVITHRA 12208 14.09.2020
568 17131A05C9IV
B.TECH.CSE MATTA JAYASRI 12100 16.09.2020
569 17131A05D0IV
B.TECH.CSE MATTA VIJAYABABU 12615 30.09.2020
570 17131A05D1IV
B.TECH.CSE MEDAPATI PAVANI 12078 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
571 17131A05D2IV
B.TECH.CSE M LOKESH 11478 14.09.2020
572 17131A05D4IV
B.TECH.CSE MEKA SURYA VAMSI 12258 30.09.2020
573 17131A05D8IV
B.TECH.CSE MUNJETI SAIKEERTHANA 12162 27.09.2020
574 17131A05D9IV
B.TECH.CSE MYGAPULA SRAVANI 11737 15.09.2020
575 17131A05E0IV
B.TECH.CSE N RAVI TEJA 11375 13.09.2020
576 17131A05E1IV
B.TECH.CSE NALLANA SANDEEP 12120 17.09.2020
577 17131A05E2IV
B.TECH.CSE NALLURU SRIHANITA 10727 2.09.2020
578 17131A05E3IV
B.TECH.CSE NAMRATHA MODALAVALASA 11775 15.09.2020
579 17131A05E5IV
B.TECH.CSE NAREDLA LAKSHITH SAI KUMAR 11596 15.09.2020
580 17131A05E7IV
B.TECH.CSE NEHAL AHMAD 11256 16.09.2020
581 17131A05E8IV
B.TECH.CSE NULI SRINIVASA SRI SASHANK 11719 15.09.2020
582 17131A05F0IV
B.TECH.CSE PADALA KONDA REDDY 12728 5.10.2020
583 17131A05F2IV
B.TECH.CSE PADALA SHESHA SAI PRUDHVI RAJ 12086 22.09.2020
584 17131A05F3IV
B.TECH.CSE PAILA SAI SHARAT 11983 14.09.2020
585 17131A05F5IV
B.TECH.CSE PANDULA LAKSHMI AAKANKSHA 10788 7.09.2020
586 17131A05F6IV
B.TECH.CSE PANKU JAGADISH 12712 5.10.2020
587 17131A05F7IV
B.TECH.CSE PANUGOTHU MUNI NAIK 11693 15.09.2020
588 17131A05F8IV
B.TECH.CSE PAPASANI SRAVYA 12657 30.09.2020
589 17131A05G0IV
B.TECH.CSE PASUMARTHI MOWNITHA 11137 11.09.2020
590 17131A05G2IV
B.TECH.CSE PENDYALA SURYA SRIKAR 12709 5.10.2020
591 17131A05G5IV
B.TECH.CSE PILLI VAMSIKRISHNA 11384 14.09.2020
592 17131A05G6IV
B.TECH.CSE POTLURI KASI VENKATA SAI 11691 15.09.2020
593 17131A05G7IV
B.TECH.CSE POTTURI GIRI MADHAV 11724 15.09.2020
594 17131A05G8IV
B.TECH.CSE PRANITA AGRAWAL 12686 30.09.2020
595 17131A05G9IV
B.TECH.CSE PRASHANTH GOWRI SHANKAR UPPUDI 11470 14.09.2020
596 17131A05H0IV
B.TECH.CSE PULLELA SURYA SAI SAMPATH 12309 10.10.2020
597 17131A05H2IV
B.TECH.CSE PUSUKURI NAVYA SREE 11333 13.09.2020
598 17131A05H5IV
B.TECH.CSE RAAHEL BAIG 11697 15.09.2020
599 17131A05H6IV
B.TECH.CSE RACHAMALLA DIVYA MADHURI 12752 14.10.2020
600 17131A05H7IV
B.TECH.CSE RAGALA DHEERAJ 11854 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
601 17131A05H8IV
B.TECH.CSE RAJABHATTULA POORNIMA VAISHNAVI 11396 14.09.2020
602 17131A05I0IV
B.TECH.CSE REDDY BALA KRISHNA 11585 15.09.2020
603 17131A05I3IV
B.TECH.CSE S PRAGATHI 12475 14.10.2020
604 17131A05I4IV
B.TECH.CSE S. JASMITHA CHOWDARY 11824 15.09.2020
605 17131A05I5IV
B.TECH.CSE SAGI PAVAN KUMAR RAJU 11287 14.09.2020
606 17131A05I6IV
B.TECH.CSE SAGINALA SHARON 11880 15.09.2020
607 17131A05I7IV
B.TECH.CSE POTNURU SAHITYA 10961 12.09.2020
608 17131A05I8IV
B.TECH.CSE SAI SRI MADHURIMA PANDRUVADA 11872 15.09.2020
609 17131A05I9IV
B.TECH.CSE SAMAREDDI TEJA SAI 11821 15.09.2020
610 17131A05J0IV
B.TECH.CSE TUMU SAMHITHA 12654 30.09.2020
611 17131A05J2IV
B.TECH.CSE SANGANA RAKESH REDDY 11546 15.09.2020
612 17131A05J3IV
B.TECH.CSE SANKURU MANOJ KUMAR 11083 10.09.2020
613 17131A05J4IV
B.TECH.CSE SAYYAD AZEEZ 11751 15.09.2020
614 17131A05J5IV
B.TECH.CSE SHAIK BAJI 11237 12.09.2020
615 17131A05J6IV
B.TECH.CSE SHAIK FATHIMUNNISA 12082 14.09.2020
616 17131A05J7IV
B.TECH.CSE SHAIK HUSSAIN ALI 12071 14.09.2020
617 17131A05J8IV
B.TECH.CSE SHAIK IRFAN AMEER 12024 14.09.2020
618 17131A05J9IV
B.TECH.CSE SHAIK PARVEZ 12109 16.09.2020
619 17131A05K0IV
B.TECH.CSE SHAIK RESHMA 12084 14.09.2020
620 17131A05K1IV
B.TECH.CSE SHAIK RESHMA 11612 15.09.2020
621 17131A05K2IV
B.TECH.CSE SHAIK UMAR SALEEM 10994 13.09.2020
622 17131A05K3IV
B.TECH.CSE SHIVA VENKATA TEJASWI MANDEM 12129 19.09.2020
623 17131A05K5IV
B.TECH.CSE SIRAPARAPU DILIP 11570 15.09.2020
624 17131A05K6IV
B.TECH.CSE SIVANGI SAMEER KISHAN VARMA 12252 30.09.2020
625 17131A05K9IV
B.TECH.CSE TADI SASIKANTH VARMA 11847 15.09.2020
626 17131A05L0IV
B.TECH.CSE TALLURI ANUSHA 10927 10.09.2020
627 17131A05L1IV
B.TECH.CSE TAMBA NAVYA JYOTHI 11411 14.09.2020
628 17131A05L3IV
B.TECH.CSE TERLI YASWANTH 11284 14.09.2020
629 17131A05L4IV
B.TECH.CSE T. MANMAYEE 12765 7.10.2020
630 17131A05M0IV
B.TECH.CSE VALAPARLA DEVIKA RANI 11468 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
631 17131A05M1IV
B.TECH.CSE VANA SAI KIRAN 12083 14.09.2020
632 17131A05M2IV
B.TECH.CSE VANGAPANDU PRIYANKA 11299 14.09.2020
633 17131A05M3IV
B.TECH.CSE VARANASI DILEEP 11088 10.09.2020
634 17131A05M5IV
B.TECH.CSE VARANASI SUSMITHA 11429 14.09.2020
635 17131A05M7IV
B.TECH.CSE VASA V D N SAI DEEPIKA 11084 10.09.2020
636 17131A05M8IV
B.TECH.CSE VEDURLA V S N ANJANI SUCHITHRA 11080 10.09.2020
637 17131A05M9IV
B.TECH.CSE VELAGA VIJAY KUMAR 11741 15.09.2020
638 17131A05N0IV
B.TECH.CSE VEMPOLU RAMA BHARGAVI 12922 12909 9.10.2020
639 17131A05N1IV
B.TECH.CSE VENKATA NARASIMHA SRIKAR GADE 11811 15.09.2020
640 17131A05N2IV
B.TECH.CSE VENNA JEEVANSAISUJIT REDDY 11922 14.09.2020
641 17131A05N3IV
B.TECH.CSE VENNELA HIMA SAHITHI 12767 7.10.2020
642 17131A05N4IV
B.TECH.CSE VISHNUMOLAKALA NIKHILA 11835 15.09.2020
643 17131A05N5IV
B.TECH.CSE VUDIKALA PRAMODH SUGUNAKAR 11204 12.09.2020
644 17131A05N7IV
B.TECH.CSE YALLA KRUPAVARA NAGA PRASAD 11410 14.09.2020
645 17131A05N8IV
B.TECH.CSE YARABOTHULA VENKATA SAI KRISHNA 11347 13.09.2020
646 17131A05N9IV
B.TECH.CSE YERRAMSETTI BINDU SAI SHIVANI 11785 15.09.2020
647 18135A0501IV
B.TECH.CSE ADAPA KULAKARNA SAI 11285 14.09.2020
648 18135A0502IV
B.TECH.CSE ASHREET PATNAIK 11241 12.09.2020
649 18135A0503IV
B.TECH.CSE ASI APPALA KISHORE REDDY 10981 13.09.2020
650 18135A0504IV
B.TECH.CSE BALIREDDY HARIKA 11202 12.09.2020
651 18135A0505IV
B.TECH.CSE BARATAM YASHASWINI 11211 12.09.2020
652 18135A0507IV
B.TECH.CSE BEHARA SAI KIRAN 11229 12.09.2020
653 18135A0508IV
B.TECH.CSE BHASKARLA MANJUNADH SATYADEVA 11785 15.09.2020
654 18135A0509IV
B.TECH.CSE BOBBILI MANIDEEP 12704 5.10.2020
655 18135A0510IV
B.TECH.CSE BOLLIKONDA SRIKANTH 10964 13.09.2020
656 18135A0512IV
B.TECH.CSE DESETTI E RAJKUMAR 11588 15.09.2020
657 18135A0514IV
B.TECH.CSE GANDI KISHORE 10966 13.09.2020
658 18135A0515IV
B.TECH.CSE INDANA DIVYA SREE 11710 15.09.2020
659 18135A0516IV
B.TECH.CSE KADIMI GOVARDHANRAO 12521 3.10.2020
660 18135A0517IV
B.TECH.CSE KAMIREDDY BHAGYA SRI 12073 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
661 18135A0518IV
B.TECH.CSE KAMMILA SURYA NARAYANA RAJU 11339 13.09.2020
662 18135A0519IV
B.TECH.CSE KANDELA PADMAVATHI 11541 15.09.2020
663 18135A0520IV
B.TECH.CSE KARANAM SRAVANI 11706 15.09.2020
664 18135A0521IV
B.TECH.CSE KARAPA VENKATA SATYANARAYANA 12530 3.10.2020
665 18135A0523IV
B.TECH.CSE KOTHA LAKSHMI PARVATHI 11702 15.09.2020
666 18135A0524IV
B.TECH.CSE KOYYALA VENKAT MANIKANTA 11778 15.09.2020
667 18135A0525IV
B.TECH.CSE MAHAMKALI VENKATA SATYA MANOJ 11711 15.09.2020
668 18135A0526IV
B.TECH.CSE MATHA SRINIVAS 11739 15.09.2020
669 18135A0528IV
B.TECH.CSE NAKKA JOSHNA 11708 15.09.2020
670 18135A0529IV
B.TECH.CSE NALAM HEMANTH SAI MOHAN 11499 14.09.2020
671 18135A0530IV
B.TECH.CSE NALUKURTHI BHANU PRASAD 12204 14.09.2020
672 18135A0532IV
B.TECH.CSE PADALA MOUNIKA SREEVALLI 11718 15.09.2020
673 18135A0534IV
B.TECH.CSE PARVATHANENI BHAVITHA 11781 15.09.2020
674 18135A0535IV
B.TECH.CSE PEDDIREDDY VENKATARAJESH 12205 14.09.2020
675 18135A0536IV
B.TECH.CSE RACHAKONDA VARAHA VENKATA SAITEJA 11498 14.09.2020
676 18135A0537IV
B.TECH.CSE SAJJA JAYA GANESH 12203 14.09.2020
677 18135A0538IV
B.TECH.CSE SATIVADA VENKATESH 12179 27.09.2020
678 18135A0539IV
B.TECH.CSE SINGUPURAM BHAGYASREE 11773 15.09.2020
679 18135A0540IV
B.TECH.CSE TEPPALA SATEESH 11761 15.09.2020
680 18135A0542IV
B.TECH.CSE THATHINENI SAI KUMAR 11767 15.09.2020
681 18135A0544IV
B.TECH.CSE TULUGU DURGA PRASAD 10967 13.09.2020
682 18135A0545IV
B.TECH.CSE TUMMURI JYOTHINATH VENKATESH 12000 30.09.2020
683 18135A0546IV
B.TECH.CSE UPPALAPATI SRAVYA 12216 23.09.2020
684 18135A0547IV
B.TECH.CSE VANTALA VAMSI 12180 26.09.2020
685 18131A0401III
B.TECH.ECE ACHANTI LAKSHMI PRANEETHA 11186 12.09.2020
686 18131A0402III
B.TECH.ECE ADHYATMABHATTAR RAMANUJACHARYULU 12462 14.10.2020
687 18131A0403III
B.TECH.ECE ADIREDDY SOWMYA CHANDANA 11573 15.09.2020
688 18131A0406III
B.TECH.ECE ALLADI VENKATA RAO 12575 5.10.2020
689 18131A0407III
B.TECH.ECE ALLAKA NAGA NAVEEN 11117 10.09.2020
690 18131A0408III
B.TECH.ECE AMBATI SAIKIRAN 10798 8.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
691 18131A0409III
B.TECH.ECE ALUGOJU MUNNA GIREESH 12489 19.10.2020
692 18131A0410III
B.TECH.ECE AREPALLI HEMANTH 12060 14.09.2020
693 18131A0411III
B.TECH.ECE AVUGADDI NARASIMHA NAIDU 11344 13.09.2020
694 18131A0412III
B.TECH.ECE ARIPAKA MOUNISHA 11190 12.09.2020
695 18131A0413III
B.TECH.ECE BADAGALA CHINMAYI 11126 11.09.2020
696 18131A0414III
B.TECH.ECE BALAGA RAVIRAJA VENKATA RAMANA MURTHY 11637 15.09.2020
697 18131A0415III
B.TECH.ECE BALLA SAI PRANEETH CHANDRA 12128 24.09.2020
698 18131A0416III
B.TECH.ECE BAMMIDI SUMAN 11493 14.09.2020
699 18131A0417III
B.TECH.ECE BANAVATHU MANI DEEP KUMAR NAIK 12727 5.10.2020
700 18131A0418III
B.TECH.ECE SINGAMSETTY SAI VIKAS 11536 15.09.2020
701 18131A0419III
B.TECH.ECE BARLI SUSHMA 11289 14.09.2020
702 18131A0420III
B.TECH.ECE BEHARA SAI ASHISH 10943 11.09.2020
703 18131A0421III
B.TECH.ECE BANDARU SOWJANYA PRIYA 11992 29.09.2020
704 18131A0423III
B.TECH.ECE BODAPUDI HEMANTH 10940 12.09.2020
705 18131A0426III
B.TECH.ECE BODDU DEEPCHAND 11057 9.09.2020
706 18131A0427III
B.TECH.ECE BOJJA SAI VENKATA TEJASWINI 11124 10.09.2020
707 18131A0429III
B.TECH.ECE BOLISETTY DHANUSH 11419 14.09.2020
708 18131A0430III
B.TECH.ECE BONGU PREM CHANDH 11562 15.09.2020
709 18131A0431III
B.TECH.ECE BONI SOWMYA 11159 12.09.2020
710 18131A0432III
B.TECH.ECE CHAKRAMAHANTHI SAI VARDHAN 12651 30.09.2020
711 18131A0433III
B.TECH.ECE CHALLA MUKUND SAINATH 11875 15.09.2020
712 18131A0434III
B.TECH.ECE CHAMALA SAI KIREETI REDDY 12542 3.10.2020
713 18131A0435III
B.TECH.ECE CHALUVADI NAVYA MEENAKSHI 11610 15.09.2020
714 18131A0436III
B.TECH.ECE CHANDANA MRUDULA 11581 15.09.2020
715 18131A0437III
B.TECH.ECE CHANDURI SAI MANO AAKASH 11082 10.09.2020
716 18131A0438III
B.TECH.ECE CHAVATA SASI PAVAN 11071 9.09.2020
717 18131A0439III
B.TECH.ECE CHATTU MANIDEEP 11580 15.09.2020
718 18131A0440III
B.TECH.ECE CHEKURI TRIVIKRAM RAYUDU 12403 30.09.2020
719 18131A0441III
B.TECH.ECE CHERUKURI SRI SOWMYA 12286 30.09.2020
720 18131A0444III
B.TECH.ECE CHINTHALAPUDI GEETH NAGA SATYA VIDYA SAGAR 11575 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
721 18131A0445III
B.TECH.ECE CHUKKA ANUSHA 11577 15.09.2020
722 18131A0447III
B.TECH.ECE DADISETTY HARIKA 11392 14.09.2020
723 18131A0448III
B.TECH.ECE DANTULURI SAI VINAY VARMA 12930 20.10.2020
724 18131A0449III
B.TECH.ECE DARMISETTI GAYATHRI 11732 15.09.2020
725 18131A0451III
B.TECH.ECE DASARI VENKATA SIVA RAGHAVENDRA 12543 3.10.2020
726 18131A0453III
B.TECH.ECE DAVALA BHUVANESWARI AKSHITHA 12707 5.10.2020
727 18131A0454III
B.TECH.ECE DHARMAVARAPU VENKATA DAKSHINA MURTHY 10724 1.09.2020
728 18131A0455III
B.TECH.ECE DHANRAJ RUDRAPATI 12597 5.10.2020
729 18131A0456III
B.TECH.ECE DONDAPATI SAMUEL JEEVAN RUFUS 12919 13.10.2020
730 18131A0457III
B.TECH.ECE DUPATI VAMSI KRISHNA 11620 15.09.2020
731 18131A0458III
B.TECH.ECE EMANDI DEEPAK 11167 12.09.2020
732 18131A0459III
B.TECH.ECE ENUGULA SAI SARAN 11685 15.09.2020
733 18131A0460III
B.TECH.ECE GADDAM S R G K S RAKESH 10707 31.08.2020
734 18131A0461III
B.TECH.ECE GANDUPALLI TARUN TEJA 12532 3.10.2020
735 18131A0463III
B.TECH.ECE GEMBALI RAKESH 12308 10.10.2020
736 18131A0464III
B.TECH.ECE GOGADA NARENDRA 12785 04.10.2020
737 18131A0468III
B.TECH.ECE GORANTLA NAVEEN 11131 11.09.2020
738 18131A0469III
B.TECH.ECE GORRELA SAI KIRAN 12217 18.09.2020
739 18131A0470III
B.TECH.ECE GOTTIMUKKALA AKHIL 11917 14.09.2020
740 18131A0471III
B.TECH.ECE GORUMUCHU DILEEP KUMAR 11586 15.09.2020
741 18131A0472III
B.TECH.ECE GULLIPALLI LAXMI CHARAN SRINIVAS 11959 14.09.2020
742 18131A0473III
B.TECH.ECE GUNTREDDI DEEPAK SAI 12569 4.10.2020
743 18131A0475III
B.TECH.ECE GURANA SRI CHARAN 12744 5.10.2020
744 18131A0476III
B.TECH.ECE HANUMANTHU SAI SURYA DORA 12474 14.10.2020
745 18131A0477III
B.TECH.ECE INDEE VARA LALAM 12665 30.09.2020
746 18131A0478III
B.TECH.ECE INDU PRIYA LALAM 12664 30.09.2020
747 18131A0479III
B.TECH.ECE ITTA SRAVANI RUTH 12519 2.10.2020
748 18131A0480III
B.TECH.ECE J S L PRATYUSHA 11308 12.09.2020
749 18131A0481III
B.TECH.ECE JANNU VISHAAL 12603 30.09.2020
750 18131A0482III
B.TECH.ECE JAMI VENKATA SANTOSH 12504 1.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
751 18131A0483III
B.TECH.ECE JAYANTH KUMBHA 12788 9.10.2021
752 18131A0487III
B.TECH.ECE KADAVATI LAKSHMI PRASANNA 11873 15.09.2020
753 18131A0489III
B.TECH.ECE KAMIREDDY LEELA SOWJANYA 11295 16.09.2020
754 18131A0492III
B.TECH.ECE KANIGIRI SOWMYA SREE 11372 12.09.2020
755 18131A0494III
B.TECH.ECE KARRI SUJANA 11240 12.09.2020
756 18131A0496III
B.TECH.ECE KASINADHUNI VISHNU KAUSTHUBH 11902 14.09.2020
757 18131A0497III
B.TECH.ECE KARRI VINODH 12149 22.09.2020
758 18131A0498III
B.TECH.ECE KODIMELA SAI VARDHAN 11261 16.09.2020
759 18131A04A0III
B.TECH.ECE KODUKULA SYAMALA 10787 7.09.2020
760 18131A04A2III
B.TECH.ECE KOMPELLA CHAITANYA 12562 4.10.2020
761 18131A04A4III
B.TECH.ECE KORAKUTI LOKESWARI 11420 14.09.2020
762 18131A04A5III
B.TECH.ECE KORIKANA DHARANI 10973 13.09.2020
763 18131A04A6III
B.TECH.ECE KORRA PALLAVI 11385 14.09.2020
764 18131A04A7III
B.TECH.ECE KORUKONDA GANESH BABU 12531 3.10.2020
765 18131A04A8III
B.TECH.ECE KUNAPAREDDY JITHENDER 11172 12.09.2020
766 18131A04A9III
B.TECH.ECE KOTA PRAVALLIKA 12031 14.09.2020
767 18131A04B0III
B.TECH.ECE KUPPILI LAKSHMI SHANMAI 11771 15.09.2020
768 18131A04B1III
B.TECH.ECE LAVETI PRANAY CHANDRA SUBHASH 12221 24.09.2020
769 18131A04B2III
B.TECH.ECE LINGA PALLAVI 12254 30.09.2020
770 18131A04B3III
B.TECH.ECE MADDI GOPI CHENDU 12116 17.09.2020
771 18131A04B4III
B.TECH.ECE MADDU SANDHYA 12774 7.10.2020
772 18131A04B6III
B.TECH.ECE MALLIPEDDI GAYATHRI SHIVA PRIYA 11901 14.09.2020
773 18131A04B7III
B.TECH.ECE MANAPURAM HIMA VAMSI SURYA PRABHATH 11424 17.09.2020
774 18131A04B8III
B.TECH.ECE MANDAPATI VENKATA GAYATRI RISHITA 12616 30.09.2020
775 18131A04B9III
B.TECH.ECE MANDELLI ARAVIND 11774 15.09.2020
776 18131A04C0III
B.TECH.ECE MATSA LEELA LAHARI 12235 30.09.2020
777 18131A04C2III
B.TECH.ECE MENATI YASASWINI 11898 28.09.2020
778 18131A04C3III
B.TECH.ECE MOGGA HANOSH KUMAR 11423 14.09.2020
779 18131A04C4III
B.TECH.ECE MOHAMMED FARIDA AAFREEN 11921 14.09.2020
780 18131A04C5III
B.TECH.ECE MOHAMMED AFTAB ZAIDI 11147 11.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
781 18131A04C6III
B.TECH.ECE MOHAMMED MUSKAN SHAH 11766 15.09.2020
782 18131A04C7III
B.TECH.ECE MONDI HARISH 12621 30.09.2020
783 18131A04C8III
B.TECH.ECE MONINGI SHRUTI LAHARI 11814 15.09.2020
784 18131A04D1III
B.TECH.ECE MUDUMBA SRIKANTH 10958 12.09.2020
785 18131A04D3III
B.TECH.ECE MUTCHARLA MOUNIKA 11193 12.09.2020
786 18131A04D4III
B.TECH.ECE NALAMOTHU SAI SAMPATH 10712 29.08.2020
787 18131A04D5III
B.TECH.ECE NARRAVULA SAI CHARAN 12018 14.09.2020
788 18131A04D6III
B.TECH.ECE NEKKANTI GUNA AVINASH 11956 14.09.2020
789 18131A04D7III
B.TECH.ECE NOLLI SHANMUKHI 11795 15.09.2020
790 18131A04D8III
B.TECH.ECE NUKALA NORATTAM VITTAL SRINIVAS NAIDU 12672 30.09.2020
791 18131A04D9III
B.TECH.ECE NUTHALAPATI GANESH BABU 11149 11.09.2020
792 18131A04E1III
B.TECH.ECE PALACHARLA SRINIVASU 11418 14.09.2020
793 18131A04E2III
B.TECH.ECE PALAKONDA RATHAN SAI 12558 4.10.2020
794 18131A04E3III
B.TECH.ECE PAMIDIBOINA DEVA MANIKANTA 12126 17.09.2020
795 18131A04E4III
B.TECH.ECE PANAPANA SIVA REDDY 11752 15.09.2020
796 18131A04E5III
B.TECH.ECE PASUPULETI PRAVEENA 11962 14.09.2020
797 18131A04E6III
B.TECH.ECE PASALAPUDI RAJA VINAYA MANOJ 11672 15.09.2020
798 18131A04E8III
B.TECH.ECE PATNALA ROHINI 12145 21.09.2020
799 18131A04E9III
B.TECH.ECE PATNAYAKUNI KIRAN 12924 15.10.2020
800 18131A04F0III
B.TECH.ECE PATNALA SAIPRANEETHA 11102 10.09.2020
801 18131A04F1III
B.TECH.ECE PATTIKA VAMSI 11447 14.09.2020
802 18131A04F3III
B.TECH.ECE PALIPALLI TRIVENI 12573 4.10.2020
803 18131A04F4III
B.TECH.ECE PERIVILLI VENKATA KAMESH 11310 12.09.2020
804 18131A04F5III
B.TECH.ECE PERURI ROSHINI 11160 12.09.2020
805 18131A04F6III
B.TECH.ECE PETLA JANAKI LAKSHMI DEVI 12139 21.09.2020
806 18131A04F7III
B.TECH.ECE PETLA JANAKI RAMADEVI 12138 21.09.2020
807 18131A04F8III
B.TECH.ECE PILLA VENKATA PAVAN 12698 30.09.2020
808 18131A04F9III
B.TECH.ECE PILLALA LIKHITHA 11738 15.09.2020
809 18131A04G0III
B.TECH.ECE PITCHIKA ADITYA 12070 14.09.2020
810 18131A04G1III
B.TECH.ECE PONDARI HARSHITHA 12548 3.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
811 18131A04G2III
B.TECH.ECE POTHIREDDY DIVYA 11700 15.09.2020
812 18131A04G5III
B.TECH.ECE PULIBANTI MAHESH KUMAR 11145 11.09.2020
813 18131A04G8III
B.TECH.ECE RACHARLA MANVITHA RAO 10796 8.09.2020
814 18131A04G9III
B.TECH.ECE RAJANA KRISHNA SASIDHAR 12510 2.10.2020
815 18131A04H1III
B.TECH.ECE REPAKA HARSHITH 12537 6.10.2020
816 18131A04H3III
B.TECH.ECE SAI ANIRUDH ANNAPANTULA 12700 30.09.2020
817 18131A04H4III
B.TECH.ECE SAI CHARAN RAGHUPATRUNI 11266 16.09.2020
818 18131A04H5III
B.TECH.ECE SAI SWAROOP RAYAPROLU 11074 9.09.2020
819 18131A04H6III
B.TECH.ECE SAMBHARA MANASWINI 12154 23.09.2020
820 18131A04H7III
B.TECH.ECE SAMPATH GANESH ADIDAM 11048 9.09.2020
821 18131A04H8III
B.TECH.ECE SANAPALA CHARAN TEJA 11164 12.09.2020
822 18131A04H9III
B.TECH.ECE SARIPALLI SRI SAI ANKITH VARMA 12681 30.09.2020
823 18131A04I0III
B.TECH.ECE SEEKU LOKESH KUMAR 11475 14.09.2020
824 18131A04I1III
B.TECH.ECE SETTY SAI CHANDH 12522 3.10.2020
825 18131A04I4III
B.TECH.ECE SHAIK MOHAMMAD MUZAMMIL 11806 15.09.2020
826 18131A04I5III
B.TECH.ECE SHAIK SAMEERUDDIN 11099 10.09.2020
827 18131A04I6III
B.TECH.ECE SIDDARTHA GURUGUBELLI 10936 11.09.2020
828 18131A04I8III
B.TECH.ECE SIRIPALLI MOHAN SAI 11896 28.09.2020
829 18131A04J0III
B.TECH.ECE SRUNGARAPATI OMPRAKASH 12066 14.09.2020
830 18131A04J1III
B.TECH.ECE SUDANAGUNTA AAKASH 12035 14.09.2020
831 18131A04J3III
B.TECH.ECE SURYA SAHISHNU KALIPATNAPU 12316 10.10.2020
832 18131A04J4III
B.TECH.ECE TALLURI NIRANJAN 12523 3.10.2020
833 18131A04J5III
B.TECH.ECE TOLIKOTI NAVYA 12273 30.09.2020
834 18131A04J6III
B.TECH.ECE TARAKA RAM GIDUTURI 12467 14.10.2020
835 18131A04J7III
B.TECH.ECE TAMANAMPUDI SAI SUDHEER REDDY 11096 10.09.2020
836 18131A04J8III
B.TECH.ECE THEJOMURTHULA RAMA VENKATA KRISHNA SRI 12552 9.10.2020
837 18131A04J9III
B.TECH.ECE THAMMANENI PRATHYUSHA REDDY 11132 11.09.2020
838 18131A04K1III
B.TECH.ECE TURLAPATI SAI SYAMALA VIKAS 12511 1.10.2020
839 18131A04K3III
B.TECH.ECE UNDURTHI KEERTHISRI 11100 10.09.2020
840 18131A04K7III
B.TECH.ECE VALLABHAJOSYULA VASUDEVA SAI ROHITH 12538 3.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
841 18131A04K8III
B.TECH.ECE VANTAKULA SHANMUKH SAI 11820 15.09.2020
842 18131A04K9III
B.TECH.ECE VARANASI NARASIMHA RAVI 12703 5.10.2020
843 18131A04L0III
B.TECH.ECE VECHALAPU GAYATRI 12755 6.10.2020
844 18131A04L2III
B.TECH.ECE VEENA SHARON EDWIN 10947 11.09.2020
845 18131A04L3III
B.TECH.ECE VEDANTAM SRI LAKSHMI 11062 9.09.2020
846 18131A04L4III
B.TECH.ECE VUYYALA SRIDIVYA 10913 9.09.2020
847 18131A04L6III
B.TECH.ECE VIJAY VARMA PERLI 12038 14.09.2020
848 18131A04L7III
B.TECH.ECE WATADA SRI GANESH ROHITH VARMA 11052 9.09.2020
849 18131A04L8III
B.TECH.ECE YALLAPRAGADA HARSHA VARDHAN 11317 12.09.2020
850 18131A04M0III
B.TECH.ECE YARRA NAGA RAM SAI 12743 5.10.2020
851 18131A04M2III
B.TECH.ECE YELUPULA HITESH 11371 12.09.2020
852 18131A04M4III
B.TECH.ECE BIRUDUKOTA VAMSI JAYADEEP 12733 5.10.2020
853 18131A04M6III
B.TECH.ECE DUVVANA JAYENDRA 12312 10.10.2020
854 18131A04M7III
B.TECH.ECE EDUBILLI HARI CHANDAN 12753 6.10.2020
855 18131A04M8III
B.TECH.ECE GUTALA ANAND VARDHAN 11092 10.09.2020
856 18131A04N0III
B.TECH.ECE KAVITI SRUTHI 11995 29.09.2020
857 18131A04N3III
B.TECH.ECE MUDDADA VIDYA BHARATHI 11089 10.09.2020
858 18131A04N6III
B.TECH.ECE SAMBARU JYOTHIKA 10949 11.09.2020
859 18131A04N9III
B.TECH.ECE VANAPALLI DIVYA SREE 12289 30.9.2020
860 18131A04P1III
B.TECH.ECE YERRABALA ANUSHA 12317 10.10.2020
861 19135A0402III
B.TECH.ECE BODDU JASHWANTH 12170 28.09.2020
862 19135A0404III
B.TECH.ECE CHOPPALA KOWSHIK 11234 12.09.2020
863 19135A0405III
B.TECH.ECE GEMBALI SARANYA 11712 15.09.2020
864 19135A0406III
B.TECH.ECE GUTTI JOGENDRA 11307 12.09.2020
865 19135A0407III
B.TECH.ECE JAYANA VENKATA SATYANARAYANA 11601 15.09.2020
866 19135A0408III
B.TECH.ECE KARRI SATYANARAYANA REDDY 12926 15.10.2020
867 19135A0409III
B.TECH.ECE KONDRU RAJESWARI 11734 15.09.2020
868 19135A0410III
B.TECH.ECE MADA SANDEEP 12001 14.09.2020
869 19135A0412III
B.TECH.ECE MATHAMSETTI K S P TULASIDHAR 11263 16.09.2020
870 19135A0414III
B.TECH.ECE MUSUNURI NAGA PAVAN 11242 12.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
871 19135A0415III
B.TECH.ECE POTHULA SATYA VAMSI 12642 30.09.2020
872 19135A0417III
B.TECH.ECE RAAJANI ARUN VEERA BABU 11238 12.09.2020
873 19135A0418III
B.TECH.ECE SAHITYA PENTAKOTA 12536 6.10.2020
874 19135A0420III
B.TECH.ECE SAYED SHAMEER AHAMAD 10723 3.09.2020
875 19135A0421III
B.TECH.ECE TELAKARAPU RENUKA 11212 12.09.2020
876 19135A0422III
B.TECH.ECE THOMANDRA SUGUNA SOFIYA 12414 30.09.2020
877 19135A0424III
B.TECH.ECE YADAGIRI SNEHA PRIYANKA 12524 3.10.2020
878 15131A04K6IV
B.TECH.ECE T. SAI VIVEK 12783 15.09.2020
879 16131A0410IV
B.TECH.ECE ABS HEMANTH 11046 9.09.2020
880 17131A0401IV
B.TECH.ECE ADDANKI NAVEEN 11264 14.09.2020
881 17131A0402IV
B.TECH.ECE ADITYA PRAKASH KURAKULA 12578 5.10.2020
882 17131A0403IV
B.TECH.ECE AMPOLU CHANDINI 12311 10.10.2020
883 17131A0404IV
B.TECH.ECE AMPOLU PRIYANKA 12903 8.10.2020
884 17131A0406IV
B.TECH.ECE ANDALAM ADARSH GOPAL 11845 15.09.2020
885 17131A0407IV
B.TECH.ECE ANDHAVARAPU TARUN 12191 30.09.2020
886 17131A0408IV
B.TECH.ECE ARISALA PREETHI 11544 15.09.2020
887 17131A0409IV
B.TECH.ECE ATCHYUTA SAI SREE HARSHA 11029 9.09.2020
888 17131A0410IV
B.TECH.ECE ATHINA KIRAN BABU 12776 11.10.2020
889 17131A0411IV
B.TECH.ECE ATHOTA PRAISY 12280 30.09.2020
890 17131A0413IV
B.TECH.ECE BALLA YASWANTH 12455 14.10.2020
891 17131A0414IV
B.TECH.ECE BALUSU AKHILESH 11199 12.09.2020
892 17131A0415IV
B.TECH.ECE BARATAM MANI KANTA 11656 15.09.2020
893 17131A0416IV
B.TECH.ECE BARATAM ROHITH 11599 15.09.2020
894 17131A0417IV
B.TECH.ECE BATHULA KEREESAA NAAWAL 12604 30.09.2020
895 17131A0418IV
B.TECH.ECE BATNA MADHU 11667 15.09.2020
896 17131A0419IV
B.TECH.ECE BATTULA HEMALATHA 12052 14.09.2020
897 17131A0420IV
B.TECH.ECE BEERAM NAGA SAI KARTHIK 11543 15.09.2020
898 17131A0421IV
B.TECH.ECE BEKKAM VENKATA SATYA SAI 11614 15.09.2020
899 17131A0422IV
B.TECH.ECE BHAGAVATHI KRISHNA CHAITANYA 11040 9.09.2020
900 17131A0423IV
B.TECH.ECE BHUVANAGIRI YASWANTH 12088 16.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
901 17131A0424IV
B.TECH.ECE BODDI DIVYA SAI 12275 30.09.2020
902 17131A0425IV
B.TECH.ECE B VENKATA KARTHIK 11740 15.09.2020
903 17131A0426IV
B.TECH.ECE BOMMITI LAKSHMI SWAGATHI 12688 30.09.2020
904 17131A0427IV
B.TECH.ECE BORRA NAGESH KUMAR 11036 9.09.2020
905 17131A0429IV
B.TECH.ECE CHAKKA MOUNICA 11437 14.09.2020
906 17131A0430IV
B.TECH.ECE CHAKRAMAHANTHI SAI VARUN 12107 16.09.2020
907 17131A0431IV
B.TECH.ECE CHALLA SRAVAN KUMAR 11913 14.09.2020
908 17131A0434IV
B.TECH.ECE CHATHARAJUPALLI DWARAKESH 11318 13.09.2020
909 17131A0435IV
B.TECH.ECE CHEBROLU THRINADH 10971 13.09.2020
910 17131A0437IV
B.TECH.ECE CHELLURI NAGA VAMSI 11733 15.09.2020
911 17131A0438IV
B.TECH.ECE CHERUKU JHANSI SIVA 11722 15.09.2020
912 17131A0439IV
B.TECH.ECE CHERUVU SREE NAVYA 11907 14.09.2020
913 17131A0440IV
B.TECH.ECE CHINTAKAYALA SAI DILEEP 11919 14.09.2020
914 17131A0441IV
B.TECH.ECE CHINTALAPATI D V M P SUBBARAJU 12675 30.09.2020
915 17131A0442IV
B.TECH.ECE CH SIVA NAGA SRI 11639 15.09.2020
916 17131A0443IV
B.TECH.ECE D. VENKATA SAI CHARAN 12490 19.10.2020
917 17131A0444IV
B.TECH.ECE DACHEPALLI RAMYA 12644 30.09.2020
918 17131A0445IV
B.TECH.ECE DANDU SARATH CHANDRA VARMA 11912 14.09.2020
919 17131A0446IV
B.TECH.ECE D HARSHA VARDHAN 11572 15.09.2020
920 17131A0448IV
B.TECH.ECE DASARI TISHITA 11967 14.09.2020
921 17131A0449IV
B.TECH.ECE DEEVI HARI CHANDANA 11981 14.09.2020
922 17131A0450IV
B.TECH.ECE DEKKA POOJITHA 11461 14.09.2020
923 17131A0451IV
B.TECH.ECE DEVULAPALLI V N S MANOJ SASTRY 12276 30.09.2020
924 17131A0452IV
B.TECH.ECE DHARANIKOTA BABA SRI SANNIHITH 11947 23.09.2020
925 17131A0453IV
B.TECH.ECE DHARANIKOTA LALITHA HARSHIKA 11079 10.09.2020
926 17131A0454IV
B.TECH.ECE DINTAKURTHI VENKATA VAMSI KRISHNA 11142 11.09.2020
927 17131A0455IV
B.TECH.ECE DIRISHALA CHARISHMA 10921 11.09.2020
928 17131A0457IV
B.TECH.ECE DUMPALA BHARGAV 11016 8.09.2020
929 17131A0458IV
B.TECH.ECE DUNGA VISHNU SAI PRAVEEN 12105 16.09.2020
930 17131A0459IV
B.TECH.ECE DURGAVAJJALA SAI ASHWIN 11085 10.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
931 17131A0460IV
B.TECH.ECE DUSI VENKATA SAI ANUDEEP 11244 14.09.2020
932 17131A0461IV
B.TECH.ECE DWARAMPUDI BHARGAV REDDY 11764 15.09.2020
933 17131A0462IV
B.TECH.ECE DWIBHASHYAM ANJANEYA SUBRAHMANYA LOKESH 12614 30.09.2020
934 17131A0464IV
B.TECH.ECE ERANKI SAI SURYA DURGA NAGA BABU PRATHEEK 11648 15.09.2020
935 17131A0465IV
B.TECH.ECE G RUTHVIK 11120 11.09.2020
936 17131A0466IV
B.TECH.ECE GADE PHANI SAKETH 12729 13.10.2020
937 17131A0467IV
B.TECH.ECE GAJAVALLI JOHN SWAROOP 11236 12.09.2020
938 17131A0468IV
B.TECH.ECE GANDHAM SIDDHARTHA 12768 7.10.2020
939 17131A0469IV
B.TECH.ECE GANGUMALLA SATYA SRI 11852 15.09.2020
940 17131A0471IV
B.TECH.ECE GEDDAM V V R S L VAIBHAVI 11892 28.09.2020
941 17131A0472IV
B.TECH.ECE GOLI SAI HARSHITA 12751 6.10.2020
942 17131A0473IV
B.TECH.ECE GONNABATHULA INDRA DURGA BHAVANI 12011 14.09.2020
943 17131A0475IV
B.TECH.ECE GUDIVADA CHARAN SAI 12476 14.10.2020
944 17131A0476IV
B.TECH.ECE GULLAPUDI ANIRUDH 11673 15.09.2020
945 17131A0477IV
B.TECH.ECE T HARITHA 11960 14.09.2020
946 17131A0478IV
B.TECH.ECE ILURU KHAJA MOHIDDIN 12041 14.09.2020
947 17131A0480IV
B.TECH.ECE JAYANTHI NAGA HIRANMAI 12231 30.09.2020
948 17131A0481IV
B.TECH.ECE JILLUDIMUDI CHANDRA SEKHAR 11626 15.09.2020
949 17131A0482IV
B.TECH.ECE KADAMATI SRI VENKATA RAVI TEJA 11611 15.09.2020
950 17131A0483IV
B.TECH.ECE KALLA SOMASEKHAR 11631 15.09.2020
951 17131A0484IV
B.TECH.ECE KALLURI V L S VISHNU VARDHAN 11517 15.09.2020
952 17131A0485IV
B.TECH.ECE KANCHERLA NAGA SAI VAISHNAVI 12726 5.10.2020
953 17131A0486IV
B.TECH.ECE KANKATALA SURYA DILEEP 12300 30.09.2020
954 17131A0488IV
B.TECH.ECE KANTIPUDI JAHNAVI 12708 5.10.2020
955 17131A0490IV
B.TECH.ECE KATHIKA VENKATA RAJESH VARMA 11659 15.09.2020
956 17131A0491IV
B.TECH.ECE KAVALIPURAPU SAI RAGHAVENDRA KOUSTHUB 11042 9.09.2020
957 17131A0492IV
B.TECH.ECE KELLA NEELIMA 12092 16.09.2020
958 17131A0493IV
B.TECH.ECE KILLANA PAVAN KALYAN 12613 30.09.2020
959 17131A0495IV
B.TECH.ECE KINJARAPU SPURTHI 12112 16.09.2020
960 17131A0496IV
B.TECH.ECE KODAVATI VAMSIRATANRAJ 11998 29.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
961 17131A0497IV
B.TECH.ECE KOLLEPARA SAI SINDHURA 12692 30.09.2020
962 17131A0498IV
B.TECH.ECE KOLLEPARA SAI TEJASWI 11519 15.09.2020
963 17131A0499IV
B.TECH.ECE KOLLURU VENKATA SAMPATH CHAITANYA 12770 7.10.2020
964 17131A04A0IV
B.TECH.ECE KONDAPALLI MOUNIKA 12684 30.09.2020
965 17131A04A2IV
B.TECH.ECE KONDAPALLI VENKAT NARAYANA 10756 4.09.2020
966 17131A04A3IV
B.TECH.ECE KONETI JAYALALITHA 11646 15.09.2020
967 17131A04A4IV
B.TECH.ECE KOPPISETTI KISHORE SRI SAI TEJA 12902 8.10.2020
968 17131A04A5IV
B.TECH.ECE KOPPU KRISHNA TEJA 11618 15.09.2020
969 17131A04A6IV
B.TECH.ECE KOREDLA SIREESHA 11671 15.09.2020
970 17131A04A7IV
B.TECH.ECE KORIMILLI ASHOK KUMAR 12293 30.09.2020
971 17131A04A8IV
B.TECH.ECE KOSURU GANESH VENKATA SAI NADH 11143 11.09.2020
972 17131A04A9IV
B.TECH.ECE KOTAGIRI SOWMYA 12655 30.09.2020
973 17131A04B0IV
B.TECH.ECE KOTARU SAMPATH RAJKOTI 12682 30.09.2020
974 17131A04B1IV
B.TECH.ECE KOTHALA GOWTHAM SAI SUMANTH 11763 15.09.2020
975 17131A04B2IV
B.TECH.ECE KOTHANI TEJAVANTH 11645 15.09.2020
976 17131A04B5IV
B.TECH.ECE KOTTEDA SANDEEP KUMAR 12409 30.09.2020
977 17131A04B7IV
B.TECH.ECE KOYYANA PARVATHI 11509 15.09.2020
978 17131A04B8IV
B.TECH.ECE KUNA SAI KRISHNA 11486 14.09.2020
979 17131A04B9IV
B.TECH.ECE KUNDA ROSHINI 12013 14.09.2020
980 17131A04C1IV
B.TECH.ECE LAGUDU GUNA SEKHAR SAI HARSHA 10725 2.09.2020
981 17131A04C3IV
B.TECH.ECE LAKSHMI TEJASWINI CHANDRA P 12730 5.10.2020
982 17131A04C5IV
B.TECH.ECE M. VENKATA SAI SURYA SREE VAISHNAVI 12750 14.10.2020
983 17131A04C7IV
B.TECH.ECE MACHEPALLI SISIRA 12457 14.10.2020
984 17131A04C8IV
B.TECH.ECE M. TARUN KUMAR 12915 10.10.2020
985 17131A04C9IV
B.TECH.ECE MALIREDDY BHAVANA 11260 16.09.2020
986 17131A04D0IV
B.TECH.ECE M.M. PAVAN KALYAN KUMAR 12718 5.10.2020
987 17131A04D1IV
B.TECH.ECE MANTRIPRAGADA SAI MANASA 12777 12.10.2020
988 17131A04D4IV
B.TECH.ECE MARUVADA SURYA MANIDEEP 12103 16.09.2020
989 17131A04D5IV
B.TECH.ECE MATTAMSETTI LEELA RAJENDRA 12061 14.09.2020
990 17131A04D7IV
B.TECH.ECE MITHIPATI POOJITHA LAKSHMI 11394 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
991 17131A04E2IV
B.TECH.ECE MUNAGALA GOPI CHANDU 12327 10.10.2020
992 17131A04E4IV
B.TECH.ECE MUNDLURI PRUDHVI YASWANTH 11004 8.09.2020
993 17131A04E5IV
B.TECH.ECE MURUKUTLA ASHOK 11003 8.09.2020
994 17131A04E8IV
B.TECH.ECE N.G.S. SRUJAN 12571 4.10.2020
995 17131A04F0IV
B.TECH.ECE NALAM S M SRIRAMA KOTESWARA SANDEEP 12302 10.10.2020
996 17131A04F1IV
B.TECH.ECE NAMBARI LAVANYA YADAV 11406 14.09.2020
997 17131A04F2IV
B.TECH.ECE NAMBARU GAYATRI 11006 8.09.2020
998 17131A04F3IV
B.TECH.ECE NAMBURI MANVITHA 11293 14.09.2020
999 17131A04F4IV
B.TECH.ECE NANDA KISHORE KANDE 11888 28.09.2020
1000 17131A04F5IV
B.TECH.ECE NARAVA CHANDRA SEKHAR 11889 28.09.2020
1001 17131A04F7IV
B.TECH.ECE NARAYANAPURAPU TEJASWINI 12668 30.09.2020
1002 17131A04F8IV
B.TECH.ECE NETI AMRUTHA VARSHINI 11400 14.09.2020
1003 17131A04F9IV
B.TECH.ECE NUSUM RAMAKRISHNA REDDY 11443 18.09.2020
1004 17131A04G0IV
B.TECH.ECE P. MUKESH ANURAG 12554 7.10.2020
1005 17131A04G1IV
B.TECH.ECE PABBISETTY HIMA PHANINDRA 12081 14.09.2020
1006 17131A04G3IV
B.TECH.ECE PADMA PRIYA LADE 11508 15.09.2020
1007 17131A04G5IV
B.TECH.ECE PAMPANA JAYA SUVARNA SRI 11386 14.09.2020
1008 17131A04G6IV
B.TECH.ECE PAPPALA SAI TEJA 11964 14.09.2020
1009 17131A04G7IV
B.TECH.ECE PATNALA UPENDRA V V SAI VISHNU 12653 30.09.2020
1010 17131A04G8IV
B.TECH.ECE PATTAN KHAJA MOHIDDIEN 11479 14.09.2020
1011 17131A04H0IV
B.TECH.ECE PEDDINTI NEERAJA 12927 15.10.2020
1012 17131A04H2IV
B.TECH.ECE PERICHERLA VINAY VARMA 12775 11.10.2020
1013 17131A04H3IV
B.TECH.ECE PERIKALA RAJA SEKHAR 11153 11.09.2020
1014 17131A04H6IV
B.TECH.ECE PILLA L K UTKARSA 12299 30.09.2020
1015 17131A04I0IV
B.TECH.ECE PULUPULA VENKATA SIVA KUMAR 11060 9.09.2020
1016 17131A04I1IV
B.TECH.ECE R. HARITHA 12918 13.10.2020
1017 17131A04I2IV
B.TECH.ECE RAJA EDWIN 11916 14.09.2020
1018 17131A04I3IV
B.TECH.ECE RAJI KARTHIK 12584 5.10.2020
1019 17131A04I5IV
B.TECH.ECE RATTI DURGA PRASAD 12540 6.10.2020
1020 17131A04I6IV
B.TECH.ECE RAVIPALLI DINESH 11829 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1021 17131A04I7IV
B.TECH.ECE R DEVADEEP 12458 14.10.2020
1022 17131A04I8IV
B.TECH.ECE REDDYMOLU PRASANNA KUMAR REDDY 12022 14.09.2020
1023 17131A04J0IV
B.TECH.ECE P ROHITH BABU 11415 14.09.2020
1024 17131A04J1IV
B.TECH.ECE RUTHALA MANOJ 12576 5.10.2020
1025 17131A04J2IV
B.TECH.ECE SAMAVEDAM SAI RAMA SRINIVASA MANI SHANKAR 11923 14.09.2020
1026 17131A04J3IV
B.TECH.ECE SARELLA VENKATA SRI TEJA 12772 7.10.2020
1027 17131A04J6IV
B.TECH.ECE SATVIK BOORELA 12547 3.10.2020
1028 17131A04J7IV
B.TECH.ECE SAVARAPU CHARAN TEJA 11537 15.09.2020
1029 17131A04J8IV
B.TECH.ECE SEENI HEMANTH KUMAR 12662 30.09.2020
1030 17131A04K1IV
B.TECH.ECE SHAIK BHIJALANI 11290 14.09.2020
1031 17131A04K2IV
B.TECH.ECE SHAIK FARIDA FATHIMA 11808 15.09.2020
1032 17131A04K4IV
B.TECH.ECE SINGURU ABHIRAM 11545 15.09.2020
1033 17131A04K5IV
B.TECH.ECE SRUTHI BHADRI 10738 3.09.2020
1034 17131A04K6IV
B.TECH.ECE SUDDAPALLI SAI ANIRUDH 12253 30.09.2020
1035 17131A04K8IV
B.TECH.ECE SWATHI SURAMPUDI 11364 17.09.2020
1036 17131A04K9IV
B.TECH.ECE TALARI MARTINGLORYKING 11170 12.09.2020
1037 17131A04L0IV
B.TECH.ECE TALLURI SRI SAI UDAY KIRAN 12645 30.09.2020
1038 17131A04L1IV
B.TECH.ECE TANGIRALA SIVA RAMA PAVAN KUMAR 11804 15.09.2020
1039 17131A04L2IV
B.TECH.ECE TANGUDU SRIRAJ 11267 16.09.2020
1040 17131A04L3IV
B.TECH.ECE TANKALA SREEKAR 11122 11.09.2020
1041 17131A04L4IV
B.TECH.ECE TANUKONDA GOPICHAND 11770 15.09.2020
1042 17131A04L5IV
B.TECH.ECE TARAKA SRIRAM KONDA 11636 15.09.2020
1043 17131A04L6IV
B.TECH.ECE TEKI MAHESH 12661 30.09.2020
1044 17131A04L7IV
B.TECH.ECE TELAGALAPUDI BHASKAR RAJ 11735 15.09.2020
1045 17131A04L8IV
B.TECH.ECE THOLETI PRABHAKAR 11565 15.09.2020
1046 17131A04L9IV
B.TECH.ECE THOMMANDRU AJAY KUMAR 12929 15.10.2020
1047 17131A04M0IV
B.TECH.ECE THONANGI GNANA PRASANNA LAKSHMI 11257 16.09.2020
1048 17131A04M1IV
B.TECH.ECE THOTAKURA SWETHA 11086 10.09.2020
1049 17131A04M2IV
B.TECH.ECE TURPATI VINAY KUMAR 11635 15.09.2020
1050 17131A04M3IV
B.TECH.ECE VADDADI VAMSI SAKETH 11441 18.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1051 17131A04M4IV
B.TECH.ECE VADICHARLA LAKSHMI VENKATA YESWANTH REDDY 11655 15.09.2020
1052 17131A04M6IV
B.TECH.ECE VANDRASI INDRANI 11243 14.09.2020
1053 17131A04M7IV
B.TECH.ECE VANI PENTA JANARDHAN 11112 10.09.2020
1054 17131A04M8IV
B.TECH.ECE VANKARA RAKESH 12417 30.09.2020
1055 17131A04N0IV
B.TECH.ECE V SHEETAL 11914 14.09.2020
1056 17131A04N4IV
B.TECH.ECE VISWANADHA HARITHA 12136 20.09.2020
1057 17131A04N5IV
B.TECH.ECE VISWANADHA V.S. PAVAN KUMAR 10951 11.09.2020
1058 17131A04N7IV
B.TECH.ECE VULCHI NIKHITHA 12198 30.09.2020
1059 18135A0401IV
B.TECH.ECE ALAPATI JASWANTH NUKESH SUKUMAR 12617 30.09.2020
1060 18135A0402IV
B.TECH.ECE AVVARU MANIKANTA 12098 16.09.2020
1061 18135A0403IV
B.TECH.ECE BATTULA AKHILA 12140 21.09.2020
1062 18135A0404IV
B.TECH.ECE BODAPATI SRINU 11187 12.09.2020
1063 18135A0405IV
B.TECH.ECE BOTTA GAYATHRI 11462 14.09.2020
1064 18135A0406IV
B.TECH.ECE BURADAGUNTA SOLOMON 12754 6.10.2020
1065 18135A0407IV
B.TECH.ECE CHANDALURI LEELA VENKATESH KUMAR 12097 16.09.2020
1066 18135A0408IV
B.TECH.ECE CHEEPURUPALLI MANO BALAJI 11591 15.09.2020
1067 18135A0410IV
B.TECH.ECE CHERUKUMILLI SAI PREETHAM 11404 14.09.2020
1068 18135A0411IV
B.TECH.ECE DAMBALA PAVAN KUMAR 12099 16.09.2020
1069 18135A0412IV
B.TECH.ECE DOKKU ASHOK KUMAR 12402 30.09.2020
1070 18135A0413IV
B.TECH.ECE DWARAPUDI NAYOMI 12033 14.09.2020
1071 18135A0415IV
B.TECH.ECE ESARAPU DIWAKAR 11521 15.09.2020
1072 18135A0416IV
B.TECH.ECE GADIYAKARI SAI KRISHNA 11632 15.09.2020
1073 18135A0417IV
B.TECH.ECE GAVIREDDI VANI 11660 15.09.2020
1074 18135A0418IV
B.TECH.ECE GOLLA SANTHI 11714 15.09.2020
1075 18135A0420IV
B.TECH.ECE GUDIWAKA NAGARANI 12401 30.09.2020
1076 18135A0421IV
B.TECH.ECE KANITHI MANASA 12166 28.09.2020
1077 18135A0424IV
B.TECH.ECE KORRA JASHUVA 11690 15.09.2020
1078 18135A0426IV
B.TECH.ECE KUMILI VEERA SAI DEEKSHITH 12269 30.09.2020
1079 18135A0427IV
B.TECH.ECE MADDI MOHAN 11203 12.09.2020
1080 18135A0428IV
B.TECH.ECE MAHEEDHARA LALITHA RAMAMANOHARI 10778 6.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1081 18135A0429IV
B.TECH.ECE MANDA J S SRINIVASA GUPTHA 12320 10.10.2020
1082 18135A0430IV
B.TECH.ECE MANEPALLI VENKATESH 11459 14.09.2020
1083 18135A0431IV
B.TECH.ECE MANGALAGIRI AJAY 11726 15.09.2020
1084 18135A0433IV
B.TECH.ECE MEDAPUREDDY HEMA LATHA 12659 30.09.2020
1085 18135A0434IV
B.TECH.ECE MUTCHAKARLA RAMADEVI 12074 14.09.2020
1086 18135A0435IV
B.TECH.ECE NARALASETTY KESAVA KUMAR 11294 14.09.2020
1087 18135A0436IV
B.TECH.ECE PALLI SIREESHA 12087 14.09.2020
1088 18135A0437IV
B.TECH.ECE PASUMARTHI HARITHA 11110 10.09.2020
1089 18135A0439IV
B.TECH.ECE PILAKA DURGA 12477 14.10.2020
1090 18135A0440IV
B.TECH.ECE POLISETTI TEJA RATNA MOUNICA 12602 30.09.2020
1091 18135A0441IV
B.TECH.ECE PUPPALA SOMA SUDHEER 11247 12.09.2020
1092 18135A0442IV
B.TECH.ECE VEERA VENKATA KOTI MALLIKARJUNUDU 12243 30.09.2020
1093 18135A0443IV
B.TECH.ECE VELAGALA SRAVANTHI 11246 14.09.2020
1094 18135A0444IV
B.TECH.ECE VULISETTY SRAVYA RAMANVITHA 12223 30.09.2020
1095 18131A0202III
B.TECH.EEE ADAPA DURGA RAJESH 11205 12.09.2020
1096 18131A0204III
B.TECH.EEE AMBARKHANA CHANDRA MOULI 12513 1.10.2020
1097 18131A0205III
B.TECH.EEE ANUPOJU SOWMYA 10907 9.09.2020
1098 18131A0206III
B.TECH.EEE BALABADRUNI ADARSH 11793 15.09.2020
1099 18131A0207III
B.TECH.EEE BALACHANDRANAIDU CHIKATI 10791 7.09.2020
1100 18131A0209III
B.TECH.EEE BANAVATHU REDDIAH NAIK 12590 5.10.2020
1101 18131A0211III
B.TECH.EEE BAVIREDDY ABHILASH 11945 14.09.2020
1102 18131A0212III
B.TECH.EEE BAPA CHAKRADHAR REDDY 10903 10.09.2020
1103 18131A0213III
B.TECH.EEE BHAGAVATULA SRI RAM KARTHIK 11259 16.09.2020
1104 18131A0215III
B.TECH.EEE BOMMANA CHANDRA SEKHARA RAO 12182 26.09.2020
1105 18131A0216III
B.TECH.EEE BOYINA AKASH 12307 10.10.2020
1106 18131A0217III
B.TECH.EEE BOYINA ANAND 12306 10.10.2020
1107 18131A0218III
B.TECH.EEE CHIGILIPALLI POOJA PRIYADARSHINI 10918 9.09.2020
1108 18131A0220III
B.TECH.EEE CHUKKA SAI KUMAR 11624 15.09.2020
1109 18131A0222III
B.TECH.EEE DASARI MANOJ 10934 11.09.2020
1110 18131A0223III
B.TECH.EEE DIKKALA AKSHAYA 10904 10.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1111 18131A0224III
B.TECH.EEE DOKUBURRA PRADEEPTHI 11969 14.09.2020
1112 18131A0228III
B.TECH.EEE GANTI LAKSHMI HARIKA 11073 9.09.2020
1113 18131A0229III
B.TECH.EEE GARAGA SAI NAGESHWARRAO 11144 11.09.2020
1114 18131A0230III
B.TECH.EEE GEDDU TARUN KUMAR 11408 14.09.2020
1115 18131A0232III
B.TECH.EEE GRANDHI RAMAPAVANKUMAR 10737 3.09.2020
1116 18131A0234III
B.TECH.EEE HARSHITA SARIPALLI 11869 15.09.2020
1117 18131A0235III
B.TECH.EEE JALLEPALLI SARANYA 12451 14.10.2020
1118 18131A0237III
B.TECH.EEE JEGURUPATI GOWRI PRASANTH 11605 15.09.2020
1119 18131A0241III
B.TECH.EEE KAMBALA RAVI TEJA 12089 16.09.2020
1120 18131A0244III
B.TECH.EEE KANKATALA NIKHITHA 11139 11.09.2020
1121 18131A0246III
B.TECH.EEE KODE YAMINI DURGA 12057 14.09.2020
1122 18131A0247III
B.TECH.EEE KOKKERAGADDA SUNETHRI 10792 7.09.2020
1123 18131A0250III
B.TECH.EEE KUNTAMUKKULA RAJAGOPAL 10728 2.09.2020
1124 18131A0252III
B.TECH.EEE KURTHADA SATHISH KUMAR 11370 12.09.2020
1125 18131A0254III
B.TECH.EEE MARPU AVINASH 11460 14.09.2020
1126 18131A0256III
B.TECH.EEE MEDA BHARATH CHANDRA 11818 15.09.2020
1127 18131A0257III
B.TECH.EEE MEESALA CHANDRA SEKHAR 12209 14.09.2020
1128 18131A0258III
B.TECH.EEE MIRTHIPATI VARAPRASAD 11388 14.09.2020
1129 18131A0259III
B.TECH.EEE MODUKURI SAI VENKATA SHRAVAN 11383 14.09.2020
1130 18131A0262III
B.TECH.EEE MULLAGIRI HEMANTH 11846 15.09.2020
1131 18131A0263III
B.TECH.EEE MUPPANDUM BHAVYA VASAVI 12722 5.10.2020
1132 18131A0264III
B.TECH.EEE MYLAPILLI HARSHAVARDHAN 11448 14.09.2020
1133 18131A0265III
B.TECH.EEE NARENDRA REDDY AKURI 11784 15.09.2020
1134 18131A0266III
B.TECH.EEE NEREDIMILLI KEDARI 11843 15.09.2020
1135 18131A0267III
B.TECH.EEE PALISETTY MANEESH 11600 15.09.2020
1136 18131A0268III
B.TECH.EEE PANDIRI HARINI 10782 7.09.2020
1137 18131A0269III
B.TECH.EEE PATNANA SWARNA TEJA 10989 13.09.2020
1138 18131A0271III
B.TECH.EEE PAVANI PARIMI 11979 14.09.2020
1139 18131A0272III
B.TECH.EEE PODIPIREDDI SWATHI 11439 18.09.2020
1140 18131A0273III
B.TECH.EEE POLAKI SARATH CHANDRA NAIDU 11269 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1141 18131A0274III
B.TECH.EEE POTNURU CHARAN MANIKANTA 11558 15.09.2020
1142 18131A0275III
B.TECH.EEE POTNURU LAXMI PRASAD 11104 10.09.2020
1143 18131A0276III
B.TECH.EEE PULLATI LAKSHMI NARSIMHA NAIDU 11815 15.09.2020
1144 18131A0278III
B.TECH.EEE RAVULAPUDI JYOTHSNA 11687 15.09.2020
1145 18131A0279III
B.TECH.EEE REMELLA R N V S S ADITYA 12660 30.09.2020
1146 18131A0280III
B.TECH.EEE SAI PARESH IRUKULLA 11887 28.09.2020
1147 18131A0281III
B.TECH.EEE SAI SRINIVAS CHENNOJU 12064 14.09.2020
1148 18131A0282III
B.TECH.EEE SALI VENKAT HITESH 11010 8.09.2020
1149 18131A0284III
B.TECH.EEE SANKA RAJ KUMAR 12021 14.09.2020
1150 18131A0285III
B.TECH.EEE SANKU NAGA DURGA SAI KRISHNA 12239 30.09.2020
1151 18131A0287III
B.TECH.EEE SAVALAPURAPU NIKHILA 11864 15.09.2020
1152 18131A0289III
B.TECH.EEE SEERAPU SAI SOWMYA 10926 10.09.2020
1153 18131A0290III
B.TECH.EEE SEEREDDI NEELIMA 11782 15.09.2020
1154 18131A0291III
B.TECH.EEE SEETHINA MOHAN KUMAR 11253 15.09.2020
1155 18131A0293III
B.TECH.EEE SHAIK PARVEZ ALI 11350 12.09.2020
1156 18131A0294III
B.TECH.EEE SISTLA SAI GOPAL 11841 15.09.2020
1157 18131A0295III
B.TECH.EEE SOURAV SADHUKHAN 11826 15.09.2020
1158 18131A0297III
B.TECH.EEE TANAKALA BHARATH 11871 15.09.2020
1159 18131A0298III
B.TECH.EEE TUMULURI VEENA MADHURI 12133 19.09.2020
1160 18131A0299III
B.TECH.EEE ULLURI SRAVANTHI 11013 8.09.2020
1161 18131A02A1III
B.TECH.EEE VELAVALAPALLI NAGA SAI 11800 15.09.2020
1162 18131A02A2III
B.TECH.EEE VENKATA SAI HEMANTH PUVVALA 10957 12.09.2020
1163 18131A02A3III
B.TECH.EEE VIPPARTHI MERCY JAEL 12134 19.9.2020
1164 18131A02A5III
B.TECH.EEE YASHASWINI MARUPALLI 12535 3.10.2020
1165 18131A02A6III
B.TECH.EEE YELETI ADARSHA 12290 30.09.2020
1166 19135A0201III
B.TECH.EEE ARAMA MANOJ KUMAR 12062 22.09.2020
1167 19135A0202III
B.TECH.EEE ATTADA RAJASEKHAR 11765 15.09.2020
1168 19135A0205III
B.TECH.EEE CHINTALAPUDI BALA SATYA SUBRAHMANYAM 11488 14.09.2020
1169 19135A0206III
B.TECH.EEE DULLA NAGENDRA SAI KUMAR 11686 15.09.2020
1170 19135A0207III
B.TECH.EEE FARAHAT PARVEEN 11510 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1171 19135A0208III
B.TECH.EEE GALI PRAVEEN 12034 14.09.2020
1172 19135A0209III
B.TECH.EEE GARIKAPATI SARATHPAVAN 11717 15.09.2020
1173 19135A0210III
B.TECH.EEE GOTTIPATI SAI VARA PRASAD 12023 14.09.2020
1174 19135A0211III
B.TECH.EEE INDALA SAIPUJA 11022 9.09.2020
1175 19135A0212III
B.TECH.EEE KADIMI REVATHI 11490 14.09.2020
1176 19135A0213III
B.TECH.EEE KAMIREDDY LAVANYA 10768 5.09.2020
1177 19135A0214III
B.TECH.EEE KODURU SHANKAR DEEPAK 10767 5.09.2020
1178 19135A0217III
B.TECH.EEE MARADANA SAI KUMAR 11101 10.09.2020
1179 19135A0218III
B.TECH.EEE MENTI LAVANYA 11681 15.09.2020
1180 19135A0219III
B.TECH.EEE MERUPULA ANITHA 11296 14.09.2020
1181 19135A0220III
B.TECH.EEE MOTURU CHIRANJEEVI 11146 11.09.2020
1182 19135A0221III
B.TECH.EEE MUMMANA VENKATESH 10974 13.09.2020
1183 19135A0222III
B.TECH.EEE MUSINANI DURGA MAHESH 11670 15.09.2020
1184 19135A0223III
B.TECH.EEE MUTHABATHULA KANCHANA 11653 15.09.2020
1185 19135A0224III
B.TECH.EEE NEMALIKANTI SWAMY SAI KRISHNA 11797 15.09.2020
1186 19135A0225III
B.TECH.EEE NIDIGATTU MANASA 11723 15.09.2020
1187 19135A0226III
B.TECH.EEE PALANI KURMA LAKSHMI KIRAN 11425 14.09.2020
1188 19135A0227III
B.TECH.EEE PALLI JYOTHSNA 11217 12.09.2020
1189 19135A0228III
B.TECH.EEE PANDIRI SAI MANOJ 11155 11.09.2020
1190 19135A0229III
B.TECH.EEE PATHARAPALLI SAIRAJU 11568 15.09.2020
1191 19135A0230III
B.TECH.EEE PATNANA UMA SHANKARARAO 11194 12.09.2020
1192 19135A0234III
B.TECH.EEE SAMAYAMANTRI M V NAGASAI PREM CHAND 11658 15.09.2020
1193 19135A0236III
B.TECH.EEE TATIPUDI DHANYA DEEPIKA 11676 15.09.2020
1194 19135A0239III
B.TECH.EEE B JYOTI 12199 30.09.2020
1195 17131A0201IV
B.TECH.EEE AISHWARYA AKELLA 11063 9.09.2020
1196 17131A0206IV
B.TECH.EEE APPALLA S B S N PAVAN TANOOJ 10749 7.09.2020
1197 17131A0208IV
B.TECH.EEE ASAPU DEEPTHI 11915 14.09.2020
1198 17131A0209IV
B.TECH.EEE BADE MOUNICA 12618 30.09.2020
1199 17131A0210IV
B.TECH.EEE BANDARU SARITHA 12612 30.09.2020
1200 17131A0212IV
B.TECH.EEE BOKAM HEMA 12237 30.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1201 17131A0215IV
B.TECH.EEE CHINDRIM DURGA SAI SIVANI 12238 30.09.2020
1202 17131A0217IV
B.TECH.EEE CHINTAKAYALA MANIKANTHA 12322 10.10.2020
1203 17131A0220IV
B.TECH.EEE M DAKSHAYANI 12529 3.10.2020
1204 17131A0221IV
B.TECH.EEE DAMARASINGI RAJASEKHAR 11148 11.09.2020
1205 17131A0224IV
B.TECH.EEE DUNGA MOUNIKA 12233 30.09.2020
1206 17131A0225IV
B.TECH.EEE G JASMANTH 11416 14.09.2020
1207 17131A0228IV
B.TECH.EEE GEMBALI UDAY KIRAN 11837 15.09.2020
1208 17131A0230IV
B.TECH.EEE GORU VANDANA 10747 7.09.2020
1209 17131A0231IV
B.TECH.EEE GUNAPU ESWAR 12113 16.09.2020
1210 17131A0232IV
B.TECH.EEE GUNDU ABHISHEK 11356 12.09.2020
1211 17131A0233IV
B.TECH.EEE HARI NAGA MAHESH KASHYAP 12314 10.10.2020
1212 17131A0235IV
B.TECH.EEE KAMBATALA NAMRATA 12630 30.09.2020
1213 17131A0236IV
B.TECH.EEE KANDALA GAYATRI VASUDHA 10755 8.09.2020
1214 17131A0239IV
B.TECH.EEE KAPAVARAPU CHAITANYA 10785 7.09.2020
1215 17131A0240IV
B.TECH.EEE K DINESH 12736 5.10.2020
1216 17131A0241IV
B.TECH.EEE KINTALI BHARGAV SAI 12190 30.09.2020
1217 17131A0242IV
B.TECH.EEE KOKA BHARGAV 12294 30.09.2020
1218 17131A0244IV
B.TECH.EEE KOMPELLA JAHNAVI 12188 30.09.2020
1219 17131A0245IV
B.TECH.EEE KOSURI VENKATA NAGA HANUMA RAVI TEJA 12244 30.09.2020
1220 17131A0246IV
B.TECH.EEE K VENKATA SESHAIAH 12226 30.09.2020
1221 17131A0249IV
B.TECH.EEE LALAM MADHURI 12635 30.09.2020
1222 17131A0251IV
B.TECH.EEE MAKALA ASHOK 12010 14.09.2020
1223 17131A0253IV
B.TECH.EEE MANOHAR DURGA 12454 14.10.2020
1224 17131A0254IV
B.TECH.EEE MANOHAR NAIDU KUBIREDDI 12502 1.10.2020
1225 17131A0255IV
B.TECH.EEE MANTRIPRAGADA SAI KARTHIK 12480 14.10.2020
1226 17131A0258IV
B.TECH.EEE GANNAVARAPU SAI SRIKAR 12473 14.10.2020
1227 17131A0259IV
B.TECH.EEE KOTHAPALLI KRISHNA SUNDARA SAI RISHWANTH ROY 12570 4.10.2020
1228 17131A0260IV
B.TECH.EEE MOHAMMED ALMAS TASLEEM 12491 19.10.2020
1229 17131A0261IV
B.TECH.EEE MUDIGONDA GANESH PAVAN KUMAR 12649 30.09.2020
1230 17131A0262IV
B.TECH.EEE NANDAVARAPU V S H GANGADHAR PAVAN 12319 10.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1231 17131A0264IV
B.TECH.EEE NETHI JASWANTH CHANDRA 12192 30.09.2020
1232 17131A0265IV
B.TECH.EEE NIMIDITALLI VIJAYA KUMAR 11531 15.09.2020
1233 17131A0267IV
B.TECH.EEE P R R VENKATESH 12541 15.09.2020
1234 17131A0268IV
B.TECH.EEE PAILA HARSHA VARDHAN 11279 14.09.2020
1235 17131A0269IV
B.TECH.EEE P HARSHA VARDHAN REDDY 11803 15.09.2020
1236 17131A0272IV
B.TECH.EEE P JAYA CHANDRA REDDY 11463 14.09.2020
1237 17131A0273IV
B.TECH.EEE PATHAN MAYEEN AVEZ 11874 15.09.2020
1238 17131A0274IV
B.TECH.EEE PATRUNI SOWMYA 11878 15.09.2020
1239 17131A0276IV
B.TECH.EEE PEDDINTI MOHANVAMSI 11903 14.09.2020
1240 17131A0277IV
B.TECH.EEE PENTA JABILI 12287 30.09.2020
1241 17131A0278IV
B.TECH.EEE PENTA YATHEESWAR 11809 15.09.2020
1242 17131A0279IV
B.TECH.EEE PERI KAMESWARA VINAY 10783 7.09.2020
1243 17131A0280IV
B.TECH.EEE PITHANI RIHARI VENKATA SATYA VAMSI 11908 14.09.2020
1244 17131A0286IV
B.TECH.EEE R VENKATA RAMANA 10714 1.09.2020
1245 17131A0288IV
B.TECH.EEE REVANTH KUMAR GANTA 11529 15.09.2020
1246 17131A0290IV
B.TECH.EEE S M LAKSHMI SARVANI GUNTUBOYINA 11848 15.09.2020
1247 17131A0291IV
B.TECH.EEE SAMAVEDAM SWETHA 11248 15.09.2020
1248 17131A0292IV
B.TECH.EEE SANAPALA PRADEEP 12904 8.10.2020
1249 17131A0293IV
B.TECH.EEE S USHA RANI 11547 15.09.2020
1250 17131A0294IV
B.TECH.EEE SANCHANA POOJITHA SAI NANDINI 11224 12.09.2020
1251 17131A0295IV
B.TECH.EEE SANIPINEEDI SRI RAM 11931 14.09.2020
1252 17131A0296IV
B.TECH.EEE SATHURI YASWANT KUMAR 11245 14.09.2020
1253 17131A0298IV
B.TECH.EEE SAVARA NAVEENA 12416 30.09.2020
1254 17131A0299IV
B.TECH.EEE SHAIKKHWAJA AFFRIDI 12240 30.09.2020
1255 17131A02A2IV
B.TECH.EEE S V NARASIMHA SAI DEEP 12721 5.10.2020
1256 17131A02A5IV
B.TECH.EEE UPPADA BALAKRISHNA 11526 15.09.2020
1257 17131A02A6IV
B.TECH.EEE V SOWJANYA 12324 10.10.2020
1258 17131A02A7IV
B.TECH.EEE VADDI SHARMILA 10982 13.09.2020
1259 17131A02A8IV
B.TECH.EEE VATTI SLEEVAREDDY 11606 15.09.2020
1260 17131A02B3IV
B.TECH.EEE Y SAI JAWAHAR 12714 5.10.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1261 17131A02B4IV
B.TECH.EEE YANAMADALA HARISH 12551 3.10.2020
1262 18135A0201IV
B.TECH.EEE ALAPATI NAVEEN KUMAR 12143 21.09.2020
1263 18135A0202IV
B.TECH.EEE ANDUGULA MIDHIL 12137 21.09.2020
1264 18135A0204IV
B.TECH.EEE BEHARA KAVITHA 12003 14.09.2020
1265 18135A0210IV
B.TECH.EEE IPPILI PRANEETH 11786 15.09.2020
1266 18135A0212IV
B.TECH.EEE KODAMAGUNDLA NARENDRA 12053 14.09.2020
1267 18135A0214IV
B.TECH.EEE KORUKONDA JASWANTH 11134 11.09.2020
1268 18135A0216IV
B.TECH.EEE MANGISETTY BHARGAV 11589 15.09.2020
1269 18135A0217IV
B.TECH.EEE NELLI VIJAYA KUMAR 11746 15.09.2020
1270 18135A0219IV
B.TECH.EEE PORAPU DIVYA 12757 6.10.2020
1271 18135A0220IV
B.TECH.EEE POTNURU SWATHI 11689 15.09.2020
1272 18135A0222IV
B.TECH.EEE RAYUDU JAGADEESH 11698 15.09.2020
1273 18135A0223IV
B.TECH.EEE REGANI MONIKA 11608 15.09.2020
1274 18135A0226IV
B.TECH.EEE TEKIMUDI LAKSHMI NARAYANA 12215 18.09.2020
1275 18135A0228IV
B.TECH.EEE VOODA VENKATA AYYAPPA 11705 15.09.2020
1276 18135A0229IV
B.TECH.EEE YASARAPU RAVI 12184 25.09.2020
1277 17131A1204III
B.TECH.IT A SAI ROHIT 12601 5.10.2020
1278 17131A1222III
B.TECH.IT CHINTADA DINESH KUMAR 11265 15.09.2020
1279 17131A1263III
B.TECH.IT KUPARALA VISHAL SAI 12114 16.09.2020
1280 17131a1267III
B.TECH.IT M GOURAV SIDDARTHA 11968 14.09.2020
1281 17131A1284III
B.TECH.IT P.V.R. SASANK 11397 14.09.2020
1282 17131A1289III
B.TECH.IT PINNINTI NEELIMA 12085 14.09.2020
1283 18131A1201III
B.TECH.IT ADAPA ASLESHA 11166 12.09.2020
1284 18131A1202III
B.TECH.IT AKULA LAKSHMI DEEPIKA 12211 14.09.2020
1285 18131A1205III
B.TECH.IT ANNAMNENI MOHAN KRISHNA 10795 8.09.2020
1286 18131A1207III
B.TECH.IT AYYALASOMAYAJULA VENKATESH 11077 10.09.2020
1287 18131A1208III
B.TECH.IT BANDARU MONISHA 11133 11.09.2020
1288 18131A1209III
B.TECH.IT BANISETTI VENKATA DURGA PRASAD 11103 10.09.2020
1289 18131A1210III
B.TECH.IT BANTUPALLI SATHVIK 12265 30.09.2020
1290 18131A1211III
B.TECH.IT BAYYA GEETHA SRIVIDYA 10912 9.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1291 18131A1212III
B.TECH.IT BHAVYA GORTHI 11325 13.09.2020
1292 18131A1213III
B.TECH.IT BHERI SRI SAI JYOTHI 11340 13.09.2020
1293 18131A1217III
B.TECH.IT BOJJAGANI DIVYA SREE 11442 18.09.2020
1294 18131A1218III
B.TECH.IT BOLLA SASI KIRAN 12656 30.09.2020
1295 18131A1219III
B.TECH.IT BOLLU VENKATA SRAVYA 11141 11.09.2020
1296 18131A1224III
B.TECH.IT DARIVEMULA V L MANIKANTA KIRAN KUMAR 11407 14.09.2020
1297 18131A1226III
B.TECH.IT GANGESETTY ABHISHEK KUMAR 11895 28.09.2020
1298 18131A1228III
B.TECH.IT GODA KRISHNA KUMARI 11119 11.09.2020
1299 18131A1229III
B.TECH.IT GUDE RAVI 12025 15.09.2020
1300 18131A1231III
B.TECH.IT GUNDA KRISHNA VAMSI 11743 15.09.2020
1301 18131A1232III
B.TECH.IT INDLACHERUVU ARAVIND 12110 16.09.2020
1302 18131A1235III
B.TECH.IT KAKI SUMANTH 11304 13.09.2020
1303 18131A1236III
B.TECH.IT KAKUMANU PAVAN KUMAR 11019 8.09.2020
1304 18131A1237III
B.TECH.IT KALLAKURI DEVI AKSHITHA 12691 30.09.2020
1305 18131A1238III
B.TECH.IT KANDREGULA ESWARA SAI TEJA 11417 14.09.2020
1306 18131A1239III
B.TECH.IT KANUGULA BHAVISHYA 10730 2.09.2020
1307 18131A1240III
B.TECH.IT KARANAM VEERA VENKATA SAI PAVAN VINAY 12291 30.09.2020
1308 18131A1241III
B.TECH.IT KASANI VENKAT RAYUDU 11072 9.09.2020
1309 18131A1242III
B.TECH.IT KASIREDDY SAI ANUJA 12282 30.09.2020
1310 18131A1243III
B.TECH.IT KATTA SUVARNA 12032 14.09.2020
1311 18131A1244III
B.TECH.IT KONATHALA NAVYA SRI 10995 13.09.2020
1312 18131A1245III
B.TECH.IT KOTERU LAHARI 10722 1.09.2020
1313 18131A1248III
B.TECH.IT KURICHETI VENKATA DIVYA TEJASWI 11076 10.09.2020
1314 18131A1249III
B.TECH.IT LIKHITHA PENTA 12229 30.09.2020
1315 18131A1251III
B.TECH.IT M VENKATA SATYA AJAY 11720 15.09.2020
1316 18131A1252III
B.TECH.IT MAJJI DILEEP KUMAR 11730 15.09.2020
1317 18131A1253III
B.TECH.IT MAMIDI VENKATA SATYA AJAY 11185 12.09.2020
1318 18131A1256III
B.TECH.IT MOHAMMED ROSHNI 12910 9.10.2020
1319 18131A1257III
B.TECH.IT MULLANGI TEJASWI 11161 12.09.2020
1320 18131A1259III
B.TECH.IT MUTHINA SIVANI 10992 13.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1321 18131A1260III
B.TECH.IT NADELLA RUTHWIK 10759 4.09.2020
1322 18131A1261III
B.TECH.IT NAMBURI V V RAGHAVENDRA NAGA SAI AKHIL 11322 13.09.2020
1323 18131A1262III
B.TECH.IT NEELAPU SRAVANI 11113 10.09.2020
1324 18131A1263III
B.TECH.IT NIDASANAMETLA DSR MOUNIKA 10776 6.09.2020
1325 18131A1265III
B.TECH.IT PADAMATA PRUDHVI 11055 9.09.2020
1326 18131A1266III
B.TECH.IT PAILU SUDHEER 11233 12.09.2020
1327 18131A1268III
B.TECH.IT PANDA VIJAY RAJ 12173 28.09.2020
1328 18131A1271III
B.TECH.IT PENMETSA YASHWANTH VARMA 11341 13.09.2020
1329 18131A1272III
B.TECH.IT PICHIKALA SAI PAVAN 11195 12.09.2020
1330 18131A1273III
B.TECH.IT PODAPATI SURYA KIRAN 10970 13.09.2020
1331 18131A1274III
B.TECH.IT POLIMERA YOGESH NAIDU 11941 14.09.2020
1332 18131A1275III
B.TECH.IT PONNAGANTI KEERTHI 11020 8.09.2020
1333 18131A1276III
B.TECH.IT POTTI SANDEEP 11595 15.09.2020
1334 18131A1277III
B.TECH.IT PRASANTH ARJILLI 12127 17.09.2020
1335 18131A1278III
B.TECH.IT PRATHIPATI REVANTH SAI KUMAR 12284 30.09.2020
1336 18131A1279III
B.TECH.IT PUJARI OMKAR 10902 10.09.2020
1337 18131A1280III
B.TECH.IT PULAPALLI ROSE SHARON NIKHITHA 12461 14.10.2020
1338 18131A1283III
B.TECH.IT RISHI SRI RUTHWICK BANDARU 12740 5.10.2020
1339 18131A1284III
B.TECH.IT RAJASRI REVANTH KONDABATHINI 12274 30.09.2020
1340 18131A1285III
B.TECH.IT SAAKETH MATTA 11891 15.09.2020
1341 18131A1286III
B.TECH.IT SEELA YOGITHA 11150 11.09.2020
1342 18131A1287III
B.TECH.IT SHAIK MANSOOR 12748 5.10.2020
1343 18131A1288III
B.TECH.IT SHAIK SHAHEED 11017 8.09.2020
1344 18131A1289III
B.TECH.IT SREERAMA PRANEETH DHANYAMRAJU 11352 12.09.2020
1345 18131A1290III
B.TECH.IT SRICHARAN PATNAM 11315 15.09.2020
1346 18131A1291III
B.TECH.IT SRUTHI BASAVA 12279 30.09.2020
1347 18131A1293III
B.TECH.IT TALAM SIVA SHANKAR VARA PRASAD 11707 15.09.2020
1348 18131A1294III
B.TECH.IT TANIKELLA N V S S KRISHNA SASTRY 11952 14.09.2020
1349 18131A1295III
B.TECH.IT THANAKALA VARSHINI 10905 10.09.2020
1350 18131A1296III
B.TECH.IT THENNETI SYAM KIRAN 11283 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1351 18131A1298III
B.TECH.IT VADREVU SRI DATTA ADITHYA SASANK 12452 14.10.2020
1352 18131A12A0III
B.TECH.IT VATSAVAI VENKATA SAI SUBRAHMANYA VARMA 11840 15.09.2020
1353 18131A12A1III
B.TECH.IT VEGI JAYANTH VIGNESH 11900 25.09.2020
1354 18131A12A2III
B.TECH.IT VELAGA DHARANI 11157 12.09.2020
1355 18131A12A3III
B.TECH.IT VEMPATI VAMSI 11641 15.09.2020
1356 18131A12A4III
B.TECH.IT VYASARAJU VENKATA HEMANTH RAJU 12771 7.10.2020
1357 18131A12A6III
B.TECH.IT Y S R SRIDHAR 10709 1.09.2020
1358 18131A12A7III
B.TECH.IT YASHASHWI DARAPU 11214 12.09.2020
1359 18131A12A8III
B.TECH.IT YASHASWINI EAGALA 12266 30.09.2020
1360 18131A12A9III
B.TECH.IT SUNKARI SAHITHI 11838 15.09.2020
1361 19135A1201III
B.TECH.IT BONTHU SAI SREE 11401 14.09.2020
1362 19135A1202III
B.TECH.IT CHANDAKA CHANDRA MOULI 10939 12.09.2020
1363 19135A1203III
B.TECH.IT CHINNAM LEELA DURGA VENKATA BHASKAR REDDY 11136 11.09.2020
1364 19135A1205III
B.TECH.IT KOTHURI VENKATA GOPI SAI MANOHAR 11138 11.09.2020
1365 19135A1206III
B.TECH.IT MUDUNURU MADHU VARMA 11213 12.09.2020
1366 19135A1207III
B.TECH.IT PADMANABHUNI SAI PRIYANKA 11059 9.09.2020
1367 19135A1209III
B.TECH.IT RAAVI PHANI SANDEEP 11484 14.09.2020
1368 19135A1211III
B.TECH.IT RUDRARAJU CHARAN SAI VARMA 12027 14.09.2020
1369 19135A1212III
B.TECH.IT SAMSANI BHAVANI SANKAR 11579 15.09.2020
1370 19135A1214III
B.TECH.IT SHAIK ARSHIYA SUHANA 12405 30.09.2020
1371 19135A1215III
B.TECH.IT TIRUMALA NAGA RAJU 11223 12.09.2020
1372 19135A1216III
B.TECH.IT YELLAPU MOHAN AJAY 12297 30.09.2020
1373 17131A1202IV
B.TECH.IT ADARI VENKATA AMRUTHA VARSHINI 12693 30.09.2020
1374 17131A1205IV
B.TECH.IT ALLAM SAI PRAVEEN REDDY 12058 14.09.2020
1375 17131A1206IV
B.TECH.IT ALLAMSETTY SAILAJA 12196 30.09.2020
1376 17131A1209IV
B.TECH.IT APPALLA POOJA KAMESWARI 10909 9.09.2020
1377 17131A1210IV
B.TECH.IT ARISETTY AMRUTH 11703 15.09.2020
1378 17131A1211IV
B.TECH.IT ARYASOMAYAJULA HARINI 11961 14.09.2020
1379 17131A1212IV
B.TECH.IT AYYANKI GOWRI LAASYA 11928 14.09.2020
1380 17131A1213IV
B.TECH.IT BADDA GAYATHRI 10735 3.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1381 17131A1214IV
B.TECH.IT BARATAM PRUDHVI 12197 30.09.2020
1382 17131A1215IV
B.TECH.IT BATHULA SAKUNTALA DEVI 10924 10.09.2020
1383 17131A1216IV
B.TECH.IT BHAMIDIPATI LAKSHMI SARVANI 11982 14.09.2020
1384 17131A1217IV
B.TECH.IT BORRA KAMAL 12212 14.09.2020
1385 17131A1218IV
B.TECH.IT BORRA PRUDVI RAJU 12408 30.09.2020
1386 17131A1219IV
B.TECH.IT BUDITHI HARSHINI 12222 30.09.2020
1387 17131A1220IV
B.TECH.IT CHENGALVALA NIHARIKA 11387 14.09.2020
1388 17131A1221IV
B.TECH.IT CHINTA NAVYA LEKHA 10784 7.09.2020
1389 17131A1223IV
B.TECH.IT CH. ANJANI NOOKAMBICA 12646 30.09.2020
1390 17131A1225IV
B.TECH.IT DEVARAJU SAI SAMPATH SRI BHAVYA 11069 9.09.2020
1391 17131A1226IV
B.TECH.IT DIDDI MANOJ KUMAR 11855 15.09.2020
1392 17131A1227IV
B.TECH.IT DIVYA D 10748 7.09.2020
1393 17131A1231IV
B.TECH.IT GARA ANUSHA 11984 14.09.2020
1394 17131A1232IV
B.TECH.IT GARUGU V N L SAI SIREESHA 11980 14.09.2020
1395 17131A1233IV
B.TECH.IT G GIRIDHAR 11251 14.09.2020
1396 17131A1234IV
B.TECH.IT GEDDA PRATHYUSHA 12514 1.10.2020
1397 17131A1235IV
B.TECH.IT GEDDAM R L S S SHANMUKHA 11897 28.09.2020
1398 17131A1236IV
B.TECH.IT GOLI REVANTH REDDY 12063 14.09.2020
1399 17131A1237IV
B.TECH.IT G SARATH KUMAR 12055 14.09.2020
1400 17131A1241IV
B.TECH.IT IMMIDISETTY MANISHA 10744 7.09.2020
1401 17131A1242IV
B.TECH.IT INAPURAPU SUREKHA 11374 12.09.2020
1402 17131A1243IV
B.TECH.IT IPPILI PRAVALLIKA 11301, 11393 11393 12.09.2020
1403 17131A1244IV
B.TECH.IT IVATURI MEHER RACHANA 11851 15.09.2020
1404 17131A1246IV
B.TECH.IT K.V.S. LANKESH 12277 30.09.2020
1405 17131A1247IV
B.TECH.IT KALLEPALLI KAVYASREE 11999 30.09.2020
1406 17131A1248IV
B.TECH.IT K BHAVYA 12668 30.09.2020
1407 17131A1249IV
B.TECH.IT KANDALA SURYA GAYATHRI SARMA 11839 15.09.2020
1408 17131A1250IV
B.TECH.IT K SURYA VINAY SRAVAN KUMAR 11208 12.09.2020
1409 17131A1251IV
B.TECH.IT KANDULA ANUSHA 12295 30.09.2020
1410 17131A1252IV
B.TECH.IT KANIGOLLA DEVI PRATHYUSHA 11699 15.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1411 17131A1253IV
B.TECH.IT KARANAM UMESHCHANDRA 12059 14.09.2020
1412 17131A1254IV
B.TECH.IT KAREDLA VENKATA SAI KEERTHANA 12466 14.10.2020
1413 17131A1255IV
B.TECH.IT KARRI ADITYA PAVAN 12720 5.10.2020
1414 17131A1257IV
B.TECH.IT KARUMURI LOHIT SAI 12068 14.09.2020
1415 17131A1258IV
B.TECH.IT KATIKA YADHIDYA 11523 15.09.2020
1416 17131A1261IV
B.TECH.IT KONDA NAGA BHANU PRAKASH 11379 13.09.2020
1417 17131A1264IV
B.TECH.IT K VENKATA SUMANTH 11654 15.09.2020
1418 17131A1265IV
B.TECH.IT L ANIL KUMAR 11434 14.09.2020
1419 17131A1268IV
B.TECH.IT MADABHUSHI SRIKANTH 10999 13.09.2020
1420 17131A1269IV
B.TECH.IT MALLA VASUDHA 12561 4.10.2020
1421 17131A1270IV
B.TECH.IT MANEPALLI YESWANTH 3.10.2020
1422 17131A1271IV
B.TECH.IT MANISANKAR NAIDU AMBATI 12153 23.09.2020
1423 17131A1272IV
B.TECH.IT M SWATHI 12245 30.09.2020
1424 17131A1273IV
B.TECH.IT MARRAPU VIDHYATEJA 11627 15.09.2020
1425 17131A1276IV
B.TECH.IT MENNI SRI HARSHITA 10987 13.09.2020
1426 17131A1277IV
B.TECH.IT M. DHEERENDRA SANDEEP 11355 12.09.2020
1427 17131A1281IV
B.TECH.IT N.V. HARSHITH SAI 12241 30.09.2020
1428 17131A1285IV
B.TECH.IT P VENKATA SAI CHARAN 12787 8.9.2020
1429 17131A1286IV
B.TECH.IT PATCHIPULUSU SREEJA 11262 16.09.2020
1430 17131A1287IV
B.TECH.IT PATTI MANOJ KUMAR 12169 28.09.2020
1431 17131A1290IV
B.TECH.IT PITHANI BHUVANA 11221 12.09.2020
1432 17131A1291IV
B.TECH.IT PULAVARTHY SRINITHYA 10986 13.09.2020
1433 17131A1292IV
B.TECH.IT REPAKA AYYAPPA SESHA VARDHAN 12764 7.10.2020
1434 17131A1293IV
B.TECH.IT REPAKA HAVISHA 10752 8.09.2020
1435 17131A1296IV
B.TECH.IT S. BINDU SRAVYA 12623 30.09.2020
1436 17131A1297IV
B.TECH.IT SANJUSHA YERRA 11014 8.09.2020
1437 17131A12A0IV
B.TECH.IT SHIFA ZAHERA 11018 8.09.2020
1438 17131A12A1IV
B.TECH.IT SINGURU SAI SWETHA 12610 30.09.2020
1439 17131A12A7IV
B.TECH.IT T LIKITHA 10933 11.09.2020
1440 17131A12B0IV
B.TECH.IT VALAVALA VENKATA LAKSHMI GAYATRI 10965 13.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1441 18135A1202IV
B.TECH.IT DASARI BHAGYASRI 12652 30.09.2020
1442 18135A1203IV
B.TECH.IT MANTHA V S R BHARATH 12586 5.10.2020
1443 18135A1206IV
B.TECH.IT TANALA DEVI 11716 15.09.2020
1444 15131A03B5III
B.TECH.MECH M RAMAKRISHNA 12697 30.09.2020
1445 17131A03G6III
B.TECH.MECH RADA BALU 10988 13.09.2020
1446 18131A0303III
B.TECH.MECH AINALA HARSHAVARDHAN 11643 15.09.2020
1447 18131A0304III
B.TECH.MECH AKELLA NIKHIL GANESH SHARMA 11078 10.09.2020
1448 18131A0305III
B.TECH.MECH ALAMURI JAYA SAI 10763 4.09.2020
1449 18131A0306III
B.TECH.MECH AMPOLU SUSHMITHA 11553 15.09.2020
1450 18131A0307III
B.TECH.MECH ANDE HEMANTH 12762 14.10.2020
1451 18131A0308III
B.TECH.MECH ANDRA HYMA 11677 15.09.2020
1452 18131A0309III
B.TECH.MECH ANGATI NAGENDRA BABU 12760 6.10.2020
1453 18131A0310III
B.TECH.MECH ANNAMREDDY MANIKANTA NAIDU 11239 12.09.2020
1454 18131A0311III
B.TECH.MECH ANTHARAGODDU JAGADISH 11300 14.09.2020
1455 18131A0312III
B.TECH.MECH BABBADHI SIVAJI 11502 15.09.2020
1456 18131A0313III
B.TECH.MECH BADAM SUJINI 11250 14.09.2020
1457 18131A0315III
B.TECH.MECH SUREDDI DATTATREYA 11563 15.09.2020
1458 18131A0316III
B.TECH.MECH BANDI SUNIL BABU 12090 16.09.2020
1459 18131A0317III
B.TECH.MECH BEERA MOHAN 11768 15.09.2020
1460 18131A0319III
B.TECH.MECH BHAVIREDDI REVANTH SAI MANOJ 11050 9.09.2020
1461 18131A0320III
B.TECH.MECH BHEESETTI DINESH PAUL 10713 29.08.2020
1462 18131A0321III
B.TECH.MECH BITTA SAI NITIN 12766 7.10.2020
1463 18131A0322III
B.TECH.MECH BODAPATI REVANTH SAI JAGAN MOHAN 11789 15.09.2020
1464 18131A0325III
B.TECH.MECH BORRA SAI GNANESH 10732 2.09.2020
1465 18131A0326III
B.TECH.MECH BYLAPUDI DILEEP 11556 15.09.2020
1466 18131A0328III
B.TECH.MECH CHEBOLU CHAITANYA AVINASH BHAVANI SHANKAR 10908 9.09.2020
1467 18131A0330III
B.TECH.MECH CHINTA JYOTHI SWARUP 11603 15.09.2020
1468 18131A0332III
B.TECH.MECH D VEERABHADRA SAI A 12115 16.09.2020
1469 18131A0333III
B.TECH.MECH DANNANA TARUN KUMAR 12711 5.10.2020
1470 18131A0334III
B.TECH.MECH DAVALA SRINIVASA RAO 11173 12.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1471 18131A0337III
B.TECH.MECH DHEERAJ REDDY ENAMAREDDY 11270 14.09.2020
1472 18131A0338III
B.TECH.MECH DODDI JAYANTH 12164 25.09.2020
1473 18131A0339III
B.TECH.MECH DONKADA SATYA NAGESWARA DINESH 10910 9.09.2020
1474 18131A0342III
B.TECH.MECH ELLAPU JAIPRAKASH 11427 14.09.2020
1475 18131A0344III
B.TECH.MECH G ANVESH KUMAR 12251 30.09.2020
1476 18131A0345III
B.TECH.MECH G HANISHA PENTAKOTA 11472 14.09.2020
1477 18131A0346III
B.TECH.MECH G LIKHIT REDDY 12163 25.09.2020
1478 18131A0347III
B.TECH.MECH GADU RITWIK 10720 3.09.2020
1479 18131A0348III
B.TECH.MECH GARAPATI CHAITHANYA 11780 15.09.2020
1480 18131A0349III
B.TECH.MECH GATTAMNENI TRIVIKRAM RAO 12911 9.10.2020
1481 18131A0352III
B.TECH.MECH GORLA NAGA ABHISHEK 11943 14.09.2020
1482 18131A0353III
B.TECH.MECH GORREPOTU KARTHIK 10741 4.09.2020
1483 18131A0356III
B.TECH.MECH GOTTUMUKKALA SISIR VARMA 11924 14.09.2020
1484 18131A0357III
B.TECH.MECH GRANDHI TEJA 11469 14.09.2020
1485 18131A0358III
B.TECH.MECH GUDA V S S VIJAY SARADHI 12624 30.09.2020
1486 18131A0360III
B.TECH.MECH GULLA CHAITANYA KIRAN 12123 17.09.2020
1487 18131A0362III
B.TECH.MECH GUNTURU AKHIL SAI KRISHNA MOULI 10914 9.09.2020
1488 18131A0363III
B.TECH.MECH GUTTI SUMANTH 11105 10.09.2020
1489 18131A0364III
B.TECH.MECH INJAMURI SRUJANA 10800 9.09.2020
1490 18131A0365III
B.TECH.MECH JADDU SAI GANESH 11196 12.09.2020
1491 18131A0368III
B.TECH.MECH JANNU GNAPIKA 12257 30.09.2020
1492 18131A0369III
B.TECH.MECH JENJETI VYSHNAVI 11274 16.09.2020
1493 18131A0371III
B.TECH.MECH JOUDULA IMMANUEL SUHAS 11002 8.09.2020
1494 18131A0372III
B.TECH.MECH K SANTOSH KUMAR KOTHA 10774 6.09.2020
1495 18131A0373III
B.TECH.MECH KADULURI LAKSHMAN KUMAR 12165 25.09.2020
1496 18131A0374III
B.TECH.MECH KALLEPALLI KRISHNA PRANEETH SASTRY 10777 6.09.2020
1497 18131A0376III
B.TECH.MECH KANAKAVALLI VIGNESH 11721 15.09.2020
1498 18131A0379III
B.TECH.MECH KARRI DEVAKESHAV 12516 2.10.2020
1499 18131A0380III
B.TECH.MECH KARRI SRI VENKATA KRISHNA SEKHAR 11432 18.09.2020
1500 18131A0382III
B.TECH.MECH KILLANI SREE VENKATA SURYA RAO 11064 9.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1501 18131A0383III
B.TECH.MECH KINTADA GOWTHAM KUMAR 11116 10.09.2020
1502 18131A0384III
B.TECH.MECH KOLATAPU CHAITANYA DURGA MUKESH 11067 9.09.2020
1503 18131A0386III
B.TECH.MECH KONA NAG NAVEEN 12507 2.10.2020
1504 18131A0388III
B.TECH.MECH KONDAPALLI BABLUNADHH 12007 14.09.2020
1505 18131A0389III
B.TECH.MECH KORIPALLI HYMAVATHI 12094 16.09.2020
1506 18131A0392III
B.TECH.MECH KRISHNAVAMSI PANTULA 10916 9.09.2020
1507 18131A0393III
B.TECH.MECH KUDAKA DUSHYANTH 12303 10.10.2020
1508 18131A0395III
B.TECH.MECH KUPPILI MIDHUN VENKATA SAI 11053 9.09.2020
1509 18131A0397III
B.TECH.MECH LAKSHMIPURAM BHARATH 11068 9.09.2020
1510 18131A0398III
B.TECH.MECH LENKA MAHESH BABU 11754 15.09.2020
1511 18131A03A1III
B.TECH.MECH MADDILA KARTHIK 11996 29.09.2020
1512 18131A03A2III
B.TECH.MECH MAHANTHI VIKASH 11830 15.09.2020
1513 18131A03A3III
B.TECH.MECH MAJJI JAYA CHANDRA 10794 8.09.2020
1514 18131A03A4III
B.TECH.MECH MALLELA GIRISH KUMAR REDDY 10761 4.09.2020
1515 18131A03A5III
B.TECH.MECH MARISA NIKHIL SANTHOSH KOTHA SAI RAM 12780 16.10.2020
1516 18131A03A6III
B.TECH.MECH MARRAPU JAGANMOHANARAO 11944 14.09.2020
1517 18131A03A8III
B.TECH.MECH MEDA POORNA CHANDRA VARMA 11857 15.09.2020
1518 18131A03B2III
B.TECH.MECH MOHAMMAD MUSTAQ AHAMED 11454 14.09.2020
1519 18131A03B3III
B.TECH.MECH MOHAMMAD MUSTHAKHEEM 12168 28.09.2020
1520 18131A03B4III
B.TECH.MECH MOHAMMAD RAFIQUE 12673 30.09.2020
1521 18131A03B7III
B.TECH.MECH MOTURI DILEEP KUMAR 12508 2.10.2020
1522 18131A03B8III
B.TECH.MECH MOTURI VENKATA RAMYA SREE 11390 15.09.2020
1523 18131A03B9III
B.TECH.MECH MUCHERLA BHASKAR SAI KALYAN 12148 28.09.2020
1524 18131A03C1III
B.TECH.MECH MYLAPILLI PRUDHVI 10790 7.09.2020
1525 18131A03C2III
B.TECH.MECH MULAGAPAKA RAM NAGENDRA KUMAR 12582 5.10.2020
1526 18131A03C3III
B.TECH.MECH MULLU SAI SANTHOSHI 11430 14.09.2020
1527 18131A03C4III
B.TECH.MECH NAGA SAI THARUN NITTALA 11093 11.09.2020
1528 18131A03C5III
B.TECH.MECH NALLI AVINASH 11435 16.09.2020
1529 18131A03C6III
B.TECH.MECH NALLI SRUJAN 11951 14.09.2020
1530 18131A03C7III
B.TECH.MECH NAMBALA ASHA KIRAN 10740 7.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1531 18131A03C8III
B.TECH.MECH NEELAM DANIEL 11278 15.09.2020
1532 18131A03C9III
B.TECH.MECH P JAYA NARASIMHA SAI SREERAM 12699 30.09.2020
1533 18131A03D0III
B.TECH.MECH NIHARTI YERNINTI 12719 5.10.2020
1534 18131A03D5III
B.TECH.MECH PADMINI TEJASWI SINGAMPALLI 11005 8.09.2020
1535 18131A03D6III
B.TECH.MECH PANDELLAPALLI JAHNAVI 11863 15.09.2020
1536 18131A03D8III
B.TECH.MECH PASUMARTHI KAMESWARA NARASIMHA SAI KUMAR 12232 30.09.2020
1537 18131A03E0III
B.TECH.MECH PEKALA NEERAJ KUMAR 11313 12.09.2020
1538 18131A03E1III
B.TECH.MECH PATNANA RAVI CHANDRA PADMA MOHAN 12218 18.09.2020
1539 18131A03E3III
B.TECH.MECH PICHIKA VISWANADH KARTHIK 12453 14.10.2020
1540 18131A03E4III
B.TECH.MECH PINNINTI ADINARAYANA 12505 1.10.2020
1541 18131A03F0III
B.TECH.MECH PYDI DILIP KUMAR 11910 14.09.2020
1542 18131A03F2III
B.TECH.MECH RAKESH PONNADA 11366 12.09.2020
1543 18131A03F3III
B.TECH.MECH RACHABATHULA VEERA VENKATA MANIKANTA 11111 10.09.2020
1544 18131A03F4III
B.TECH.MECH RAVULA SURYA SUDARSAN NAVEEN 12907 8.10.2020
1545 18131A03F5III
B.TECH.MECH RAMAVATHU HEMANTH NAIK 11015 8.09.2020
1546 18131A03F7III
B.TECH.MECH ROUTHU SAI DILEEP KUMAR 11844 15.09.2020
1547 18131A03F8III
B.TECH.MECH RISHI RAJ REDDY GUNAPATI 12724 5.10.2020
1548 18131A03F9III
B.TECH.MECH REDDI NAVEEN 11497 14.09.2020
1549 18131A03G0III
B.TECH.MECH SAI TARUN PABBISETTY 12732 5.10.2020
1550 18131A03G1III
B.TECH.MECH SAI VAMSI PAKKURTHI 11975 14.09.2020
1551 18131A03G3III
B.TECH.MECH SAMPATH SRINIVAS SAKKHARI 12255 30.09.2020
1552 18131A03G4III
B.TECH.MECH SATYA SARAVAN KUMAR KASARAPU 11227 12.09.2020
1553 18131A03G6III
B.TECH.MECH SHINDE ABHISHEK 11870 15.09.2020
1554 18131A03G7III
B.TECH.MECH SIDDARTHA V V S S 11348 12.09.2020
1555 18131A03G8III
B.TECH.MECH SISTLA PHANI GOVIND 12773 7.10.2020
1556 18131A03H0III
B.TECH.MECH SHAIK ARSHAD HUSSAIN 12506 1.10.2020
1557 18131A03H5III
B.TECH.MECH SIGIREDDI SAI KRISHNA 11491 14.09.2020
1558 18131A03H7III
B.TECH.MECH SOURAV DEY 11920 14.09.2020
1559 18131A03H9III
B.TECH.MECH SIVA GANA SRI PALAN ODUGULA 11578 15.09.2020
1560 18131A03I0III
B.TECH.MECH SUDEEP WILLIAM PAUL THOKALA 12647 30.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1561 18131A03I2III
B.TECH.MECH BANDARU RISHIKA 11725 15.09.2020
1562 18131A03I4III
B.TECH.MECH TATAVARTY MANIDEEP 10757 4.09.2020
1563 18131A03I5III
B.TECH.MECH TEEGALA RAJESH 11651 15.09.2020
1564 18131A03I8III
B.TECH.MECH THOTA STEVEN JOHN MOSES 12546 3.10.2020
1565 18131A03J3III
B.TECH.MECH VAYILADA NIKHIL 12556 9.10.2020
1566 18131A03J4III
B.TECH.MECH TULLURI DINESH KUMAR 11516 15.09.2020
1567 18131A03J5III
B.TECH.MECH VARRI GANESH VENKATA SAI KIRAN 11328 16.09.2020
1568 18131A03J6III
B.TECH.MECH VARRI PRANAY SHANKAR 10901 10.09.2020
1569 18131A03J7III
B.TECH.MECH VADDADI NIHALMAI 11729 15.09.2020
1570 18131A03J9III
B.TECH.MECH VEMPATI SURYA TEJA 12913 9.10.2020
1571 18131A03K3III
B.TECH.MECH VIJJAPU SAI SATYANAND 12572 4.10.2020
1572 18131A03K4III
B.TECH.MECH VIROTHI VENKATA SAI PRAJNESH 12227 30.09.2020
1573 18131A03K5III
B.TECH.MECH VOLETY NAGA SAI VENKATA RAMANA MURTY 11367 17.09.2020
1574 18131A03K6III
B.TECH.MECH VEYYIDHALAMULA GIREESHA 12150 22.09.2020
1575 18131A03K7III
B.TECH.MECH YAMALI DINESH 11695 15.09.2020
1576 18131A03K8III
B.TECH.MECH YAMALI SIMHADRI NAIDU 12151 22.09.2020
1577 18131A03L0III
B.TECH.MECH YAVVARI SAI GREESHMANTH 12411 30.09.2020
1578 18131A03L1III
B.TECH.MECH YERRA BHAVANI SANKAR 11081 10.09.2020
1579 18131A03L2III
B.TECH.MECH YESWANTH SAI BARRI 11210 12.09.2020
1580 18131A03L4III
B.TECH.MECH RAHUL RAMPILLA 11862 15.09.2020
1581 19135A0301III
B.TECH.MECH AKULA CHARAN SAI TEJA 12463 14.10.2020
1582 19135A0302III
B.TECH.MECH ANADASU SRIPAVAN 12029 14.09.2020
1583 19135A0303III
B.TECH.MECH BANAVATHU PAVAN 12072 14.09.2020
1584 19135A0305III
B.TECH.MECH BANDI NANDITHA 11665 15.09.2020
1585 19135A0306III
B.TECH.MECH BEJAVADA HARISH 12054 14.09.2020
1586 19135A0310III
B.TECH.MECH CHALAMURI SHYAM SUNDAR 11552 15.09.2020
1587 19135A0311III
B.TECH.MECH CHALLA HARSHA VARDHAN 11736 15.09.2020
1588 19135A0313III
B.TECH.MECH CHINNALA TIRUPATHI RAO 11683 15.09.2020
1589 19135A0314III
B.TECH.MECH EMANDI DILEEP KUMAR 12075 14.09.2020
1590 19135A0316III
B.TECH.MECH GEDADEESI PRAVEEN KUMAR 12047 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1591 19135A0317III
B.TECH.MECH GEDDADA VENKATA SIVA SAI KRISHNA SANTHOSH 12207 14.09.2020
1592 19135A0318III
B.TECH.MECH GUTTU DILLESWARA RAO 12224 30.09.2020
1593 19135A0319III
B.TECH.MECH INJARAPU MANIKANTA 11583 15.09.2020
1594 19135A0320III
B.TECH.MECH JAGARAPU SWAROOP KUMAR 12005 14.09.2020
1595 19135A0321III
B.TECH.MECH JAMPA ROKESH VARA PRASAD 11664 15.09.2020
1596 19135A0323III
B.TECH.MECH JUPUDI SAI SRIKANTH 11473 14.09.2020
1597 19135A0324III
B.TECH.MECH KANUMETTA YOGESH KUMAR 11530 15.09.2020
1598 19135A0325III
B.TECH.MECH KARRI SAI 11538 15.09.2020
1599 19135A0326III
B.TECH.MECH KODHAMALA ASHOK KUMAR 11574 15.09.2020
1600 19135A0327III
B.TECH.MECH KONA SANDEEP 11750 15.09.2020
1601 19135A0328III
B.TECH.MECH MADDIKONDALA PAVAN KALYAN 11506 15.09.2020
1602 19135A0330III
B.TECH.MECH MALIPEDDI JAYASHANKAR SATYA NAGABHUSHANRAO 11505 15.09.2020
1603 19135A0331III
B.TECH.MECH MITTA PAUL RAJU 11555 15.09.2020
1604 19135A0332III
B.TECH.MECH MOHAMMED ROUNAQ QURESHI 11511 15.09.2020
1605 19135A0336III
B.TECH.MECH NALLA VEDA KUMAR OME BABU 11649 15.09.2020
1606 19135A0337III
B.TECH.MECH PATSAMATLA LAKSHMI NAGA SRIHARI VARMA 11087 10.09.2020
1607 19135A0338III
B.TECH.MECH PEDADA RAJESH 11331 13.09.2020
1608 19135A0341III
B.TECH.MECH POLUMATI VENKATA MAHESH 12525 3.10.2020
1609 19135A0342III
B.TECH.MECH RAMBARIKA RAHUL 11674 15.09.2020
1610 19135A0344III
B.TECH.MECH SABAVATH SAIDA NAIK 11742 15.09.2020
1611 19135A0345III
B.TECH.MECH SEEDI LAXMI PRASAD 12553 4.10.2020
1612 19135A0346III
B.TECH.MECH SHAIK FAZIL 11548 15.09.2020
1613 19135A0348III
B.TECH.MECH TEEDA RAJA SEKHAR 11515 15.09.2020
1614 19135A0349III
B.TECH.MECH THATIPUDI PAVAN KUMAR 12185 25.09.2020
1615 19135A0350III
B.TECH.MECH THOTA REVANTH GANESH 12019 14.09.2020
1616 19135A0351III
B.TECH.MECH UPPALAPATI NAGA MANIKANTA SIVA RAMA RAO 11496 14.09.2020
1617 19135A0352III
B.TECH.MECH VEERABATHULA ALEX PRAJNAN PAUL 12560 4.10.2020
1618 19135A0353III
B.TECH.MECH VEERAPURAJU MOHAN ABHIRAM 11487 14.09.2020
1619 19135A0354III
B.TECH.MECH VUNDAVALLI SAI PRAKASH 12040 14.09.2020
1620 19135A0356III
B.TECH.MECH BALIREDDY HARSHAMANAIDU 11905 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1621 16131A03B8IV
B.TECH.MECH K THARUN 11791 15.09.2020
1622 16131A03B9IV
B.TECH.MECH K MOULI 12908 8.10.2020
1623 17131A0301IV
B.TECH.MECH ADARI JAYANTH SAI 11095 10.09.2020
1624 17131A0302IV
B.TECH.MECH AKELLA SIVA RAMA KRISHNA 11828 15.09.2020
1625 17131A0303IV
B.TECH.MECH AKHIL KANNEPALLI 10742 7.09.2020
1626 17131A0304IV
B.TECH.MECH AKUNURI JAMES FELIX 11963 14.09.2020
1627 17131A0305IV
B.TECH.MECH ALAMASETY NIKHIL KUMAR 11812 15.09.2020
1628 17131A0306IV
B.TECH.MECH A SAI RAGHU VAMSI 11007 8.09.2020
1629 17131A0308IV
B.TECH.MECH ALUGOLU SRI LAKSHMI SOWJANYA 11438 15.09.2020
1630 17131A0311IV
B.TECH.MECH ARAVALA SAIVAMSI 11465 14.09.2020
1631 17131A0313IV
B.TECH.MECH BAMMIDI TARUN 11569 15.09.2020
1632 17131A0314IV
B.TECH.MECH BANDARU PRAKASH 10944 11.09.2020
1633 17131A0315IV
B.TECH.MECH BANDARU TEJA RAMAKANTH 11940 14.09.2020
1634 17131A0316IV
B.TECH.MECH BANKA VASUDEVA RAO 12920 13.10.2020
1635 17131A0317IV
B.TECH.MECH BANKAPALLI CHANTI 11118 10.09.2020
1636 17131A0319IV
B.TECH.MECH BIRUDA VENKATA SAI ROHITH 12633 30.09.2020
1637 17131A0320IV
B.TECH.MECH BOBBADI RAMAKRISHNA 10941 12.09.2020
1638 17131A0321IV
B.TECH.MECH BODDA SHASHANK 12716 5.10.2020
1639 17131A0322IV
B.TECH.MECH BOLLA MANOJ VAMSI KRISHNA 12559 4.10.2020
1640 17131A0324IV
B.TECH.MECH BOODIDA SIVA RAMA NISANTH 11009 8.09.2020
1641 17131A0326IV
B.TECH.MECH BOYINA DEEKSHITH 10758 4.09.2020
1642 17131A0328IV
B.TECH.MECH BURI SANKARARAO 11709 15.09.2020
1643 17131A0331IV
B.TECH.MECH CHADUVULA NIKHIL SAI GOUTHAM 10955 12.09.2020
1644 17131A0332IV
B.TECH.MECH CHAKRAPANI SAI MADHAV 10954 12.09.2020
1645 17131A0333IV
B.TECH.MECH CHALLA VENKATA BADARI SRI RAM 12667 30.09.2020
1646 17131A0335IV
B.TECH.MECH CH NARAYANA 11554 15.09.2020
1647 17131A0336IV
B.TECH.MECH CHEEPURUPALLI DHARMENDRA 11098 10.09.2020
1648 17131A0337IV
B.TECH.MECH CHERREKI KRISHNA CHAITANYA 12246 30.09.2020
1649 17131A0338IV
B.TECH.MECH CHERUKUPALLI SAI BHYRAVA HARIKIRAN 10780 9.09.2020
1650 17131A0339IV
B.TECH.MECH CHERUKURI AKHILA SRAVANI 12017 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1651 17131A0342IV
B.TECH.MECH CHIPPADA HARISH 11974 14.09.2020
1652 17131A0343IV
B.TECH.MECH CHITIKELA LALITHA SENKER LAKSHMI MURALI 11467 14.09.2020
1653 17131A0344IV
B.TECH.MECH CHUNDURI VENKAT ROHITH 11097 10.09.2020
1654 17131A0345IV
B.TECH.MECH D NAGESWARI 11477 14.09.2020
1655 17131A0346IV
B.TECH.MECH DADDALA VIVEK 11025 9.09.2020
1656 17131A0347IV
B.TECH.MECH DANDA TEJASWI 11566 15.09.2020
1657 17131A0348IV
B.TECH.MECH DASARI SAI ANVESH 10765 4.09.2020
1658 17131A0349IV
B.TECH.MECH DEVARAPU JAGADEESWARA RAO 11621 15.09.2020
1659 17131A0351IV
B.TECH.MECH DHARMANA LAKSHMANA RAO 11694 15.09.2020
1660 17131A0352IV
B.TECH.MECH DUBBA GAUTHAM 11955 14.09.2020
1661 17131A0353IV
B.TECH.MECH DUMPALA SUNEETHA 12183 26.09.2020
1662 17131A0358IV
B.TECH.MECH E. KRISHNA MANOJ 11049 9.09.2020
1663 17131A0361IV
B.TECH.MECH G M JAGAPATHI RAJU 11362 12.09.2020
1664 17131A0362IV
B.TECH.MECH GANALA SAI MANIKANTA 11485 14.09.2020
1665 17131A0363IV
B.TECH.MECH GANTASETTI MOHAN 12318 10.10.2020
1666 17131A0365IV
B.TECH.MECH GEDELA SATEESH 11337 13.09.2020
1667 17131A0366IV
B.TECH.MECH GEMBALI RESHMA KUMARI 11464 14.09.2020
1668 17131A0367IV
B.TECH.MECH GOLLA OLIVE 11163 12.09.2020
1669 17131A0372IV
B.TECH.MECH GUDIMETLA SURYA NISCHAL 11954 14.09.2020
1670 17131A0374IV
B.TECH.MECH GUNTU BALAKRISHNA 11593 15.09.2020
1671 17131A0375IV
B.TECH.MECH HARIKA MUDADLA 12156 28.09.2020
1672 17131A0376IV
B.TECH.MECH J. JETHESWAR BHAGAVATH 11877 15.09.2020
1673 17131A0377IV
B.TECH.MECH JANJALA PRAVEENKANTH 11426 14.09.2020
1674 17131A0378IV
B.TECH.MECH JARAPALA GOPI 11713 15.09.2020
1675 17131A0379IV
B.TECH.MECH JATAVATH SRINIVAS NAIK 12620 30.09.2020
1676 17131A0381IV
B.TECH.MECH JULIAN ISAIAH DURGAM 12650 30.09.2020
1677 17131A0382IV
B.TECH.MECH KAMBATALA NAVNEETA 12631 30.09.2020
1678 17131A0384IV
B.TECH.MECH KANITI TEJA 12004 14.09.2020
1679 17131A0387IV
B.TECH.MECH KARI LAXMAN 12194 30.09.2020
1680 17131A0388IV
B.TECH.MECH KARINKI SRI KOWNDINYA GOWD 12628 30.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1681 17131A0389IV
B.TECH.MECH KARRI SURYA VENKATA DIVYATEJA 11476 14.09.2020
1682 17131A0391IV
B.TECH.MECH KEDARISETTY PAVAN SAI GUPTA 11200 12.09.2020
1683 17131A0392IV
B.TECH.MECH KELLA RAKESH 12234 30.09.2020
1684 17131A0393IV
B.TECH.MECH KOKKILIGADDA VAMSI 12281 30.09.2020
1685 17131A0394IV
B.TECH.MECH KOLLI AVINASH 11696 15.09.2020
1686 17131A0395IV
B.TECH.MECH KOLLURI RAMA BHADRA SASTRY 11044 10.09.2020
1687 17131A0396IV
B.TECH.MECH KONATHALA HIMA SANAM 11860 15.09.2020
1688 17131A0398IV
B.TECH.MECH KONDETI NAVEEN KUMAR 11201 12.09.2020
1689 17131A03A0IV
B.TECH.MECH K SRI SURYA 12734 5.10.2020
1690 17131A03A2IV
B.TECH.MECH KORUKONDA LEELA NAGENDRA PRASAD 12501 1.10.2020
1691 17131A03A3IV
B.TECH.MECH KOTTU VIVEK PATNAIK 11925 14.09.2020
1692 17131A03A5IV
B.TECH.MECH L PREM VIKASH 12478 14.10.2020
1693 17131A03B0IV
B.TECH.MECH MADEM HRUDAY 11032 9.09.2020
1694 17131A03B1IV
B.TECH.MECH MADUGULA GURU CHARAN SAIRAM 12256 30.09.2020
1695 17131A03B3IV
B.TECH.MECH MALLA MOHAN SAI 11336 13.09.2020
1696 17131A03B5IV
B.TECH.MECH MALLIPEDDI TEJASWARI 11525 15.09.2020
1697 17131A03B6IV
B.TECH.MECH MANDELA CHANDRA MOULI 11616 15.09.2020
1698 17131A03B8IV
B.TECH.MECH M. SREE CHARAN 11075 10.09.2020
1699 17131A03B9IV
B.TECH.MECH MARKAPUDI RATNA KUMAR 11769 15.09.2020
1700 17131A03C0IV
B.TECH.MECH MARRAPU SANTHOSH KUMAR 11642 15.09.2020
1701 17131A03C2IV
B.TECH.MECH MEDISETTI GUNA TEJA 11376 13.09.2020
1702 17131A03C6IV
B.TECH.MECH MOHAMMED SHARUK JELANI 10733 2.09.2020
1703 17131A03C8IV
B.TECH.MECH MOSA LAVANYA 11458 14.09.2020
1704 17131A03C9IV
B.TECH.MECH MRINALINI POONDLA 11312 12.09.2020
1705 17131A03D2IV
B.TECH.MECH NANDAM TEJASWI 12130 19.09.2020
1706 17131A03D3IV
B.TECH.MECH NANDIKI HARIKA 11140 11.09.2020
1707 17131A03D4IV
B.TECH.MECH NANDIKOLLA SATYA SURYA PAVAN 11402 14.09.2020
1708 17131A03D6IV
B.TECH.MECH NARISE HARSHA DHANUJ 10721 3.09.2020
1709 17131A03D7IV
B.TECH.MECH NELLIKONDA HARSHA VARDHAN GOUD 11881 15.09.2020
1710 17131A03D8IV
B.TECH.MECH NUTHALAPATI BHUVANA 11054 9.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1711 17131A03D9IV
B.TECH.MECH P JANANI 11906 14.09.2020
1712 17131A03E1IV
B.TECH.MECH PADI AVINASH 11977 14.09.2020
1713 17131A03E2IV
B.TECH.MECH PADISETTI DAMODAR KRISHNA SAI 11298 14.09.2020
1714 17131A03E3IV
B.TECH.MECH PAILA UDAY KIRAN 10935 11.09.2020
1715 17131A03E4IV
B.TECH.MECH PAKKI PREM SAI 10948 11.09.2020
1716 17131A03E7IV
B.TECH.MECH PANDURI TEJA KUMAR 11286 14.09.2020
1717 17131A03E8IV
B.TECH.MECH PANTALA MOHITH 11792 15.09.2020
1718 17131A03F0IV
B.TECH.MECH PARAPATHI SWETHA BHANU 12044 14.09.2020
1719 17131A03F1IV
B.TECH.MECH PECHETTI SATEESH 10739 3.09.2020
1720 17131A03F2IV
B.TECH.MECH PENTA JAYAVARDHAN 11950 14.09.2020
1721 17131A03F4IV
B.TECH.MECH P.A.V. RAMA KRISHNA 12640 30.09.2020
1722 17131A03F6IV
B.TECH.MECH POLAVARAPU RAJ SUMANTH 11268 16.09.2020
1723 17131A03F7IV
B.TECH.MECH PONNAGANTI HARSHASREE 11972 14.09.2020
1724 17131A03F8IV
B.TECH.MECH PORAPU SAI RAKESH 11560 15.09.2020
1725 17131A03F9IV
B.TECH.MECH POTNURU SAI 11109 10.09.2020
1726 17131A03G1IV
B.TECH.MECH B PRATYUSHA 12534 3.10.2020
1727 17131A03G2IV
B.TECH.MECH PRIYANKA SATAPATHY 11932 21.09.2020
1728 17131A03G5IV
B.TECH.MECH P APPALA NAIDU 11762 15.09.2020
1729 17131A03G7IV
B.TECH.MECH RAJANA SAI PRASANTH 11759 15.09.2020
1730 17131A03G9IV
B.TECH.MECH RAVIKANTI VENKATA SRICHARAN 12193 30.09.2020
1731 17131A03H0IV
B.TECH.MECH RAYAVARAPU LALITHA 11457 14.09.2020
1732 17131A03H1IV
B.TECH.MECH REVU VAMSI 11550 15.09.2020
1733 17131A03H4IV
B.TECH.MECH RUDRABHATLA BHARATH KUMAR 10731 2.09.2020
1734 17131A03H5IV
B.TECH.MECH S.K. CHIRANJIVI BULUSU 11949 14.09.2020
1735 17131A03H6IV
B.TECH.MECH V. MANOJ CHANDRA 12637 30.09.2020
1736 17131A03H7IV
B.TECH.MECH SABBAVARAPU NARESH 11482 14.09.2020
1737 17131A03H8IV
B.TECH.MECH SAKA SURENDRA 12413 30.09.2020
1738 17131A03H9IV
B.TECH.MECH SAMANTHULA GNANA SHEKAR REDDY 12152 22.09.2020
1739 17131A03I0IV
B.TECH.MECH SANNIDHI VEERA VENKATA SAI VENU GOPAL 12091 16.09.2020
1740 17131A03I5IV
B.TECH.MECH SEEPANA LALITHA KUMARI 11904 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1741 17131A03I6IV
B.TECH.MECH SEEPANA MAHENDRA VARMA 12710 5.10.2020
1742 17131A03I9IV
B.TECH.MECH SHAIK JIYAWUL REHMAN 11755 15.09.2020
1743 17131A03J0IV
B.TECH.MECH SHAIK SANDANI BASHA 11757 15.09.2020
1744 17131A03J4IV
B.TECH.MECH SINGUPURAM PRAHALAD 12043 21.09.2020
1745 17131A03J5IV
B.TECH.MECH SOBHA SRUJANA PATRI 11327 13.09.2020
1746 17131A03J6IV
B.TECH.MECH S KARTHIK 10775 6.09.2020
1747 17131A03J7IV
B.TECH.MECH SREEKAR SATISH MALLA 10770 5.09.2020
1748 17131A03J8IV
B.TECH.MECH SRINIVAS ANIRUDH RAPARTHI 11311 12.09.2020
1749 17131A03J9IV
B.TECH.MECH SUBHADRA DEVI POOSAPATI 11799 15.09.2020
1750 17131A03K0IV
B.TECH.MECH SUGGU VENKAT SAI KRISHNA REDDY 12404 30.09.2020
1751 17131A03K1IV
B.TECH.MECH SUNEETH MALLA 12503 1.10.2020
1752 17131A03K5IV
B.TECH.MECH TALE KUSHAL SAI 11788 15.09.2020
1753 17131A03K6IV
B.TECH.MECH TANGUDU GOVINDARAJU 12756 6.10.2020
1754 17131A03K7IV
B.TECH.MECH TATTIKOTA VINAY SAI KUMAR 12759 6.10.2020
1755 17131A03K8IV
B.TECH.MECH TEJASRI SAI SOWJANYA TENNETI 12155 28.09.2020
1756 17131A03K9IV
B.TECH.MECH TELAGATHOTI NAVEEN 11395 14.09.2020
1757 17131A03L3IV
B.TECH.MECH UNDRALLA HARISH 11273 16.09.2020
1758 17131A03L6IV
B.TECH.MECH V.V. RAM SAI SATVIK 11360 12.09.2020
1759 17131A03L7IV
B.TECH.MECH VADDIPARTHI SAI KRISHNA RAJEEV 11349 12.09.2020
1760 17131A03L8IV
B.TECH.MECH VADREVU VINAY VAMSI 12705 5.10.2020
1761 17131A03M0IV
B.TECH.MECH VANGAPANDU THANU SRI NAIDU 11198 12.09.2020
1762 17131A03M2IV
B.TECH.MECH V. YASWANTH 12219 25.09.2020
1763 17131A03M3IV
B.TECH.MECH VASIPALLI DEVI RAJ CHANDRIKA 12468 14.10.2020
1764 17131A03M6IV
B.TECH.MECH VUDUMULA VINAY SAMPATH KUMAR 12096 16.09.2020
1765 17131A03M8IV
B.TECH.MECH YARRA NAGA KANAKA AMBICA 12609 30.09.2020
1766 17131A03N1IV
B.TECH.MECH YEZZALA NITHYA SREE 10762 4.09.2020
1767 18135A0303IV
B.TECH.MECH BANGARI SYAMKUMAR 11609 15.09.2020
1768 18135A0305IV
B.TECH.MECH BODDU SAI KALI DINESH 12069 14.09.2020
1769 18135A0307IV
B.TECH.MECH CHALLA RAMA 11679 15.09.2020
1770 18135A0308IV
B.TECH.MECH CHEBROLU MANASA 11480 14.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1771 18135A0309IV
B.TECH.MECH CHEVVETI VINAY 11011 8.09.2020
1772 18135A0310IV
B.TECH.MECH CHINNE RISHWANTH JOSH 11345 13.09.2020
1773 18135A0311IV
B.TECH.MECH CHINNI YESWANTH 11449 14.09.2020
1774 18135A0312IV
B.TECH.MECH CHITTURI LAVANYA 11604 15.09.2020
1775 18135A0313IV
B.TECH.MECH DADI JYOTHSNA 11422 14.09.2020
1776 18135A0314IV
B.TECH.MECH DARABATTULA LAKSHMI PRASANNA 11777 15.09.2020
1777 18135A0315IV
B.TECH.MECH DODDI HEMANTH SAI KUMAR 12643 30.09.2020
1778 18135A0317IV
B.TECH.MECH GOGADA PARVATHI 11542 15.09.2020
1779 18135A0318IV
B.TECH.MECH GORAPALLI DILIPKUMAR 12928 15.10.2020
1780 18135A0319IV
B.TECH.MECH GORLE PRADEEP 11533 15.09.2020
1781 18135A0320IV
B.TECH.MECH GUDIVADA HARISH 12579 5.10.2020
1782 18135A0321IV
B.TECH.MECH JEERLA MOUNICA 12036 14.09.2020
1783 18135A0322IV
B.TECH.MECH KANDIBOINA MANOJ 11346 13.09.2020
1784 18135A0323IV
B.TECH.MECH KASA DINESH 12171 28.09.2020
1785 18135A0324IV
B.TECH.MECH KOPPISETTY ARUN KUMAR 10985 13.09.2020
1786 18135A0325IV
B.TECH.MECH KOPPISETTY NAGA NARASINGA RAO 12619 30.09.2020
1787 18135A0328IV
B.TECH.MECH MAKALA SAI HARISH 12622 30.09.2020
1788 18135A0329IV
B.TECH.MECH MALLI MANIKANTA 11129 11.09.2020
1789 18135A0331IV
B.TECH.MECH MEDASANI RAJ NIKHIL 12147 21.09.2020
1790 18135A0332IV
B.TECH.MECH MIRIYALA KULADEEP VAMSI KRISHNA 11207 12.09.2020
1791 18135A0333IV
B.TECH.MECH MOHAMMAD ABDUL GAFOOR 11886 28.09.2020
1792 18135A0334IV
B.TECH.MECH MUDUMBAI VENKATA NARASIMHA MANASA TEJA 11428 14.09.2020
1793 18135A0335IV
B.TECH.MECH MYLAPILLI ANAND 12045 14.09.2020
1794 18135A0336IV
B.TECH.MECH NARAYANASETTI KISHORE 12039 14.09.2020
1795 18135A0338IV
B.TECH.MECH PADAVALA PAVAN SAI KUMAR 11220 12.09.2020
1796 18135A0339IV
B.TECH.MECH PAILA SAI RAJESH 11452 14.09.2020
1797 18135A0341IV
B.TECH.MECH PETA SAI CHARAN 11617 15.09.2020
1798 18135A0344IV
B.TECH.MECH SAROJ KHAN 11772 15.09.2020
1799 18135A0347IV
B.TECH.MECH SURADA RAJASEKHAR 11451 14.09.2020
1800 18135A0349IV
B.TECH.MECH TONANGI VENKATESH 12272 30.09.2020
GAYATRI VIDYA PARISHAD COLLEGE OF ENGINEERING (AUTONOMOUS)
LIST OF STUDENTS PAID TUITION FEE (UPDATED AS ON 19.10.2020) FOR B.TECH. III / IV YEAR, 2020 - 21
S.
NO.Roll No. Class Branch Name of the Student Receipt No. Date
1801 18135A0350IV
B.TECH.MECH TUPAKULA TARUN 11184 12.09.2020
1802 18135A0351IV
B.TECH.MECH TUTTA RAJUBABU 11582 15.09.2020
1803 18135A0352IV
B.TECH.MECH VANTAKU VINAY KUMAR 12049 14.09.2020
1804 18135A0353IV
B.TECH.MECH Y.SRI RAJ KUMAR 11756 15.09.2020
1805 18135A0355IV
B.TECH.MECH CHELLABOYENA PAVAN KUMAR 11070 9.09.2020
1806 18135A0356IV
B.TECH.MECH KARANAM VIVEK 12671 30.09.2020
1807 18135A0357IV
B.TECH.MECH THADI RAJESH 11358 17.09.2020