National Health Mission, Odisha
-
Upload
khangminh22 -
Category
Documents
-
view
1 -
download
0
Transcript of National Health Mission, Odisha
Iot
Mission DirectorateNational Health Mission, Odisha
Department of Health & Family Welfare,Government of Odisha6roro qq! 66q
Letter No: OSH&FWSA2/nL __,/2018aa4n*t.l
t'Date: 2*. s4 '18
From
Shalini Pandit, 1.A.5
Mission Director, NHM, Odisha
ToAll Directors, H&FW Department, Covt. of OdishaDirector, Capital Hospital/RCH, Rourkela/AHRCC, CuttackAll Superintendentr, 6ovt. Medical & Hospitals. OdishaSuperintendent, SVPPIGP, CuttackAll CDM& PHOs-cum-District Mission Directors. OdishaAll Nodal Officers, NUHM. Corporation Cities, Odisha
Sub: Approval of State/District/City/Lead Agency wise NHM PIP 2018-19.
Madam/ 5ir,
Based on ROP received from MoHFW. Covt. of lndia and with due approval of ExecutiveCommittee of OSHFWS, the approval is hereby accorded of Rs.I58134.86 Lakhs under NHM PIP
2018-19 for the State as per the statement attached at Annexure-A.
The PIP budSet sheet has been revamped & broadly categorized the exirting budget linesunder 18 functional heads. The functional head-wise budget abstract is attached at Annexure-B. This is
exPected to enhance efficiency & provide holistic view of crosi cutting componentj across differentprogrammes under NHM. At the same time, inttruction has been given to use the fund judiciouslyunder given functional heads, which has been detailed out in the Terms & Conditions. which is
attached at Annexure-C l& 2.
While good progress has been made in rolling out different programmes, there is urgent needto deal with increasing burden of NCDs, must not lose track to fight again( communicable diseases &achieve unfinished agenda of RMNCH+A. ln addition, revised Conditionality for incentives &disincentives (Annexure-D) and Milestone & targets (Annexure-E) have been given for assessingperformance on different aspects of proSramme implementation. The detailed State/ Diitrict/ CitylLead Agency wise NHM PIP 2018-19 is attached herewith for information and necessary action.
I look forward to achieve the tarSet asainst theses approvals in due time with the support ofimplementing partners.
Annex Building of SIH&FW, ( ni!8, Nar-apa i, Bhubaneswar-7s1012T€l-0674-2J92480/88 E-mailr missiondirectorarittnic.in.\\,eb: nww..lrhrr rlssa.gov.tn
::M;;'-,NHM, Odisha.
$EAI
ii"
\{EA(
elols qqe 66q
Ioa
Mission DirectorateNational Health Mission, Odisha
Department of Health & Family Welfare,Government of Odisha
7-
vemo No. l9i{t2- Date.!, N'tSCopy submitted to the Commissioner-cum-secretary to 6ovt. H & FW DepartTfnt
for kind information and necessary action. W
M:M
, Odisha
Director,
Copy forwarded to all Officers and Consultants of Directorates / SPMU for information andnecessary action. (ll
)rvtiffiDireaor,
NHM, Odisha
Memo No. tD09t Date.2+, oq . {l
Date.
Memo No. t 9rer aq Date. ,-& - e4 'lt
Copy forwarded to all State Representatives, Development partners for innecersary action.
NHM, Odisha
on and
Missi Director,NHM, Odisha
Copy forwarded to all Collectors and DiJtrict Magistrates, Odisha for information S. necessaryaction. IZv
Mis*6 Direaor,NHM, Odisha
Memo No.taO9fCopy forwarded to all DPMs for information and necessary action.
Mi ion Director,NHM, Odisha
Memo t to. l B,o ?-0 Date.Copy forwarded to all CPMs for information and necessary action.
Mi on Director,NHM, Odisha
P1"rno P6.l ) 02 Date. )* .o€,1*
Annex Building of SIH&FW, Unit-8, Nayapalli, Bhubaneswar-7Sl0t2Tel-0674-2392480/88 E-mail: missiondircctora4tnic.in.\1,eb: wwlt.nrhmorissa,sov.in
Annexure-A
District/ Lead Agency Wise Budget (NHM PIP 2018-19)
Sl. No. District Total (Rs. In Lakhs) Grand Total
(Rs. In Lakhs) NHM NUHM
1 Angul 3976.11 12.88 3988.99
2 Balasore 6985.44 133.62 7119.06
3 Baragarh 3607.50 102.97 3710.47
4 Bhadrak 4535.10 86.61 4621.71
5 Bolangir 5621.95 99.95 5721.90
6 Boudh 1600.85 0.00 1600.85
7 Cuttack 6609.34 60.53 6669.87
8 Deogarh 1353.39 0.00 1353.39
9 Dhenkanal 3097.05 49.25 3146.29
10 Gajapati 2909.21 81.39 2990.60
11 Ganjam 8787.21 0.00 8787.21
12 Jagatsinghpur 2862.37 36.73 2899.09
13 Jajpur 4919.42 42.92 4962.35
14 Jharsuguda 1660.06 154.77 1814.82
15 Kalahandi 4607.24 61.85 4669.09
16 Kandhamal 4211.21 14.56 4225.77
17 Kendrapara 3892.44 16.32 3908.76
18 Keonjhar 5329.59 69.99 5399.58
19 Khurda 3633.76 86.44 3720.20
20 Koraput 4892.55 145.53 5038.08
21 Malkanagiri 2635.94 12.40 2648.34
22 Mayurbhanj 8800.37 88.31 8888.68
23 Nawarangpur 4370.34 18.39 4388.73
24 Nayagarh 2514.48 0.00 2514.48
25 Nuapada 2219.09 0.00 2219.09
26 Puri 3734.15 166.20 3900.35
27 Rayagada 3884.03 55.72 3939.75
28 Sambalpur 4646.99 0.00 4646.99
29 Sonepur 2793.60 0.00 2793.60
30 Sundargarh 5124.24 31.25 5155.50
31 Cap Hosp 1577.94 0.00 1577.94
32 RGH 530.51 0.00 530.51
33 SCB 664.40 0.00 664.40
34 MKCG 460.47 0.00 460.47
35 VSS 527.64 0.00 527.64
36 SVPPGIP 311.09 0.00 311.09
37 PRMMCH MBJ 8.46 0.00 8.46
38 SLNMCH KPT 8.46 0.00 8.46
39 AHRCC Cuttack 8.69 0.00 8.69
40 Bhubaneswar CHS 76.79 1051.43 1128.21
41 Cuttack CHS 24.30 631.36 655.66
42 Sambalpur CHS 18.61 338.62 357.22
43 Berhampur CHS 17.74 365.59 383.34
44 Rourkella CHS 16.28 454.33 470.61
45 State 22771.77 826.81 23598.57
Total 152838.15 5296.70 158134.86
Mission Director, NHM, Odisha
SIH & FW, AnnexBuilding, Nayapalli, Bhubaneswar- 751012 Phone/Fax: 0674- 2392479/80, E-mail: [email protected]. web: www.nrhmodisha.gov.in
Mission Directorate National Health Mission, Odisha
Department of Health & Family Welfare, Government of Odisha.
Consolidated approved budget of Kandhamal under NHM 2018-19.
FMR. Budget Head Total Amount Approved
(Rs. In Lakhs) Grand Total
(Rs. In Lakhs) NHM NUHM
1 U.1 SD Facility Based 365.34 0.00 365.34
2 U.2 SD Community Based 110.27 2.21 112.47
3 U.3 Community Intervention 497.03 0.69 497.72
4 U.4 Untied Fund 330.10 0.95 331.05
5 U.5 Infrastructure 570.26 0.00 570.26
6 U.6 Procurement 233.25 0.00 233.25
7 U.7 Referral Transportation 28.88 0.00 28.88
8 U.8 SD Human Resource 856.92 5.79 862.71
9 U.9 Training & Capacity Building 100.32 0.18 100.50
10 U.10 Review, Research, Surveillance & Surveys
3.47 0.00 3.47
11 U.11 IEC/BCC 60.58 0.00 60.58
12 U.12 Printing 8.04 0.00 8.04
13 U.13 Quality Assurance 27.21 0.00 27.21
14 U.14 Drug Warehousing & Logistics 49.92 0.00 49.92
15 U.15 PPP 194.68 0.00 194.68
16 U.16 Programme Management 388.49 4.62 393.11
17 U.17 IT Initiatives for strengthening Service Delivery
0.00 0.00 0.00
18 U.18 Innovations 386.46 0.12 386.58
Grand Total 4225.77
Annexure-C.1
RoP Conditionalities for State
NHM PIP 2018-19
All approvals are subject to the Framework for Implementation of NHM and
guidelines issued from time to time and the observations made in this document.
The State must ensure due diligence in expenditure and observe, in letter and spirit, all
rules, regulations, and procedures to maintain financial discipline and integrity
particularly with regard to procurement; competitive bidding must be ensured, and only
need-based procurement should take place.
The 18 major heads of the budget have been divided into three groups. In group-A
there are budget heads for infrastructure, HR, Program management, Innovation, IEC
and PPP. No additional funds could be added to the approvals under group A budget
heads. Group B consists of Training, Quality assurance and Research and evaluations,
from which funds cannot be taken out. Group C has the rest of the 9 heads, wherein
State as per its requirement may reallocate funds from one head to another for
approved activities with the approval of the executive committee and the Governing
body of the State Health Society.
All procurement to be based on competitive and transparent bidding process.
The unit cost/rate approved for all activities including procurement, printing, etc are
indicative for purpose of estimation. However, actuals are subject to transparent and
open bidding process as per the relevant and extant purchase rules.
The expenditure for program management and M&E should not exceed 9 % of the total
Annual approved budget.
State to ensure regular meetings of State and District Health Missions/ Societies. The
performance of SHS/DHS along with financials and audit report must be tabled in
governing body meetings as well as State Health Mission and District Health Mission
meetings.
The accounts of State/ grantee institution/ organization shall be open to inspection by
the sanctioning authority and audit by the Comptroller & Auditor General of India under
the provisions of CAG (DPC) Act 1971 and internal audit by Principal Accounts Officer of
the Ministry of Health & Family Welfare.
State shall ensure submission of details of unspent balance indicating inter alia, funds
released in advance & funds available under State Health Societies. The State shall also
intimate the interest amount earned on unspent balance. This amount can be spent
against approved activities.
The approval for new infrastructure is subject to the condition that States will use
energy efficient lighting and appliances.
State/UTs to submit Non-Duplication Certificate as per prescribed format
State/UTs to submit Non-Duplication Certificate as per prescribed format 10. IT
Solutions
All IT solutions being implemented by the State must be EHR compliant.
State must provide for all the entitlement schemes mandatorily. No beneficiary shall be
denied any entitlement because of cost estimates/any other reason. If there are
variations in cost, it may be examined and ratified by the RKS.
The State must ensure mandatory disclosures on the state NHM website of all publicly
relevant information as per previous directions of CIC and letters from MoHFW.
The conditionalities frame work 2018-19 for incentivisation/ disincentivisation of the
State is at Annexure A.
The MOU Milestones & targets set for the State is at Annexure-2.
Annexure-C.2
NHM PIP 2018-19
Terms & Conditions for District & Sub District level
Programme Implementation
General
• All approvals are subject to the Framework for Implementation of NHM and guidelines
issued from time to time and the observations made in this document.
• The support under NHM is intended to supplement and support, and not to substitute
State expenditure.
• District should convey the block wise approvals within 15 days of receiving the District
RoP approvals.
Finance
• The Eighteen (18) major heads of the budget have been divided into three (3) groups.
o In group-A there are budget heads for infrastructure, HR, Program management,
Innovation, IEC and PPP. No additional funds could be added to the approvals under
group A budget heads.
o Group B consists of Training, Quality assurance and Research and evaluations, from
which funds cannot be taken out.
o Group C has the rest of the 9 heads, wherein State as per its requirement may
reallocate funds from one head to another for approved activities with the approval
of the executive committee and the Governing body of the State Health Society.
• The district must ensure due diligence in expenditure and observe, in letter and spirit, all
rules, regulations, and procedures to maintain financial discipline and integrity
particularly with regard to procurement; competitive bidding must be ensured.
• All procurement to be based on competitive and transparent bidding process.
• The unit cost/rate approved for all activities including procurement, printing, etc are
indicative for purpose of estimation. However, actuals are subject to transparent and
open bidding process as per the relevant and extant purchase rules.
• Information on all ongoing works to be displayed on the NHM website
• The performance of DHS along with financials and audit report must be tabled in
governing body meetings as well as District Health Mission meeting.
• The accounts of grantee institution/ organization shall be open to inspection by the
sanctioning authority and audit by the Comptroller & Auditor General of India under the
provisions of CAG (DPC) Act 1971 and internal audit by Principal Accounts Officer of the
Ministry of Health & Family Welfare.
• District shall ensure submission of details of unspent balance indicating inter alia, funds
released in advance & funds available under District Health Societies. The district shall
also intimate the interest amount earned on unspent balance. This amount can be spent
against approved activities.
• Action on the following issues would be looked at while considering the release of
second tranche of funds:
o Compliance with conditionalities as prescribed by Department of Expenditure
(DoE) under the Ministry of Finance.
o Ensuring timely submission of quarterly report on physical and financial progress
made by the District.
o Timely submission of Statutory Audit Report for the year 2016-17.
o Before the release of funds beyond 75% of BE for the year 2018-19, District needs
to provide Utilization Certificates against the grant released to the District up to
2017-18 duly signed by CDMO and Auditor.
• District to open accounts of all agencies in PFMS and ensure expenditure capturing.
Infrastructure:
• The approval for new infrastructure is subject to the condition that district will use
energy efficient lighting and appliances.
• District to submit Non-Duplication Certificate as per prescribed format for all approved
works.
Equipment/Instruments:
• District to submit Non-Duplication Certificate as per prescribed format for all approved
items.
Mandatory Disclosures
• The district must ensure mandatory disclosures on the state NHM website of all publicly
relevant information as per previous directions of CIC and letters from MoHFW.
JSSK, JSY and Other Entitlement Scheme
• District must provide for all the entitlement schemes mandatorily. No beneficiary shall
be denied any entitlement because of cost estimates/any other reason. If there are
variations in cost, it may be examined and ratified by the RKS.
• District to ensure that JSY payments are made through Direct Benefit Transfer (DBT)
mechanism through AADHAAR enabled payment system, through NEFT under Core
Banking Solution or through A/C payee check.
Conditionalities for Incentive/ Disincentive
• The Conditionalities framework for 2018-19 is at Annexure –I.
Annexure-D
Key Conditionality under NHM for the Year 2018-19
SL. Conditionality Incentive/penalty Source of
verification % Incentive/
Penalty
1
Incentive or penalty based on NITI Aayog ranking of states on 'Performance on Health Outcomes'
Based on the ranking which will measure incremental changes:
1. The states showing overall improvement to be incentivized
2. States showing no overall increment get no penalty and no incentive
3. States showing decline in overall performance to be penalized
% of incentive/penalty to be in proportion to overall improvement shown by the best performing state and the worst performing state: +40 to -40 points
NITI Aayog report. +40 to -40
2
Grading of District Hospitals in terms of input and service delivery
At least 75% (in Non EAG) and 60% (in EAG and NE states) of all District Hospitals to have at least 8 fully functional specialties as per IPHS : 10 points incentive
Less than 40% in Non EAG and 30% in EAG to be penalized up to 10 points
HMIS and NlTI Aayog DH ranking report
+10 to -10
3 Operationalization of Health and Wellness Centers (HWC)
At least 5% of the total budget to be proposed for HWC and CPHC. State to operationalise 15% of SCs & PHCs as HWCs.
State report NHSRC report RHS
+10 to -10
SL. Conditionality Incentive/penalty Source of
verification % Incentive/
Penalty
4
% districts covered under Mental health program and providing services as per framework
If 75% of the districts covered:10 points
If 50% districts in Non-EAG and 40% districts in EAG states: incentive 6 points. Less than 40% EAG and less than 50% Non EAG to be penalized 6 points. Less than 30% in EAG and 40% in Non EAG to be penalized 10 points
Report from Mental Health Division MoH&FW
+10 to -10
5 % of 30 plus population screened for NCDs
15% of 30 plus population screened for NCDs: 10 points incentive
7% of 30 plus population screened for NCDs : 6 points incentive
Less than 3% of 30 plus population screened for NCDs : 6 points penalty
Less than 2% of 30 plus population screened for NCDs : 10 points penalty
(Out of total State Population)
Report from NCD division MoH&FW and State reports Any Survey data available
+10 to -10
6
HMIS and HRIS :HR data to be in sync and to be used in performance monitoring
Ensure implementation of HRIS for all HRH (both regular & contractual) in the State. Salary invoice and transfer orders to be generated by HRIS. Line listing of all staff for all facilities to be available. HRIS data should match with HMIS reporting. Cases where it doesn’t, state to provide reason and numbers. +10 to -10 for HRIS operationlisation and +5 to -5 for synchronization with HMIS.
HRIS (State) and HMIS report
+15 to -15
SL. Conditionality Incentive/penalty Source of
verification % Incentive/
Penalty
State where data matches: 5 points incentive. State where data doesn’t match: 5 points penalty.
7
Star rating of PHCs (both Urban and rural) based on inputs and provision of the service package agreed
75% (in Non EAG) and (60% in EAG and NE) of the PHCs having 3 or more star rating : 5 points incentive
50% (in Non EAG) and 40% (in EAG and NE) PHCs having 3 or more star rating: 2 points incentive
Less than 40% (in Non EAG) and 30% (in EAG and NE) of PHCs having 3 or more star rating to be penalized: 5 points
HMIS +5 to -5
Annexure-E
MOU Milestones and Targets
Sl No
Major Milestones Current Status Yr 2018-19 Yr 2019-20
1 Reduction of MMR 142 133
2
Reduce I. U5MR II. IMR
III. NMR
I. 75 (AHS 2012-13), 40 (NFHS4) II. 59 (AHS 2012-13), 40 (NFHS4) III. 37 (AHS 2012-13), 32 (SRS 2016)
I. 44
II. 37
III. 28
I. 41
II. 34
III. 27
3 Reduce and sustain TFR 2.2 (AHS 2012-13), 2 (SRS 2016) Maintain the current TFR
4 Increase Modern Contraceptive Prevalence Rate
45.4 (NFHS4) 0.70% 0.70%
5
Increase I. ANC (% Pregnant Women aged 15-49 years who had at least one ANC visit.
II. SBA (% of delivery attended by skilled health professionals)
I. 98.3% (AHS 2012-13) 64.1% (ANC in the 1st trimester NFHS4) II. 87.9% (NFHS4)
I. 98.2%
II. 95.8%
I. 100%
II. 99.1%
6 Full immunization of all newborns by one year of age
78.6% (NFHS4) 90% I. 90%
Sl No
Major Milestones Current Status Yr 2018-19 Yr 2019-20
7
Achieve and maintain elimination status, in respect of: (i) Leprosy (ii) Kala-Azar & (iii) Lymphatic Filariasis (iv) Malaria
(i).10.13 per million population (NLEP report) (ii)Kala-Azar- No incidence
(iii)Lymphatic Fileriasis- MF Rate – 0.33 (iv) 14.83%-ABER, (NVBDCP) 7.76%-API (NVBDCP)
(i) Leprosy - Target as recommended by WHO, Global Leprosy Strategy, 2016-2020, to be achieved and maintained by State is Grade II disability is <5.07 cases / Million population (As at present G2D is 10.13 cases / million population) (ii) Kala - Azar - Non endemic (iii) Lymphatic Filariasis - MDA in 9 districts, 3 districts under TAS and 8 districts passed TAS (iv) Malaria - ABER = > 15, API = 10.24
(i) Leprosy - Target as recommended by WHO, Global Leprosy Strategy, 2016-2020, to be achieved and maintained by State is Grade II disability < 1 case / million population (ii) Kala - Azar - Non endemic (iii) Lymphatic Filariasis - To sustain MF rate less than 1 in 9 MDA districts. (iv) Malaria - ABER = > 15, API = < 5
8
Reduce / sustain case fatality rate for Dengue at <1% (by 2018 & 2019) and set up one sentinel site hospital (SSH) in each district. Accordingly, number of new SSH in 2018 and 2019 is 15 and 10, respectively
0.14-case fatality rate for Dengue, Number of SSH- 38
35 37
9
I. Tuberculosis - Achieve and maintain a treatment success rate of 90% amongst notified drug sensitive TB cases by 2020 II. Total number of patient notification III. TB notification rate (per lakh population) IV. TB mortality rate (per lakh population)
I. 89 % (2016-17) and the same for 2017-18 is yet to come as reported by RNTCP division. II. 42845 III. 95.5 IV. 3.1-TB mortality rate *Source RNTCP
I. 90% II. 72643 III. 160 IV. 26
I. 90% II. 83496 III. 182 IV. 22
Sl No
Major Milestones Current Status Yr 2018-19 Yr 2019-20
10 Blindness - Reduce the prevalence of blindness and the disease burden
I. Cataract Operations: 132887 II. Free Spectacles to school children: 90242 III. Collection of donated eyes: 1344
I. Cataract Operations: 276853 II. Free Spectacles to school children: 31261 III. Collection of donated eyes: 1500
I. Cataract Operations: 275000 II. Free Spectacles to school children: 40000 III. Collection of donated eyes: 2000
11
To halt premature mortality from cardiovascular diseases, cancer, diabetics or chronic respiratory diseases by 2020. Baseline ICMR India State Level Disease Burden Study
920 deaths due to cardiovascular disease and 74 death due to cancer and 177 deaths due to diabetes during January to December, 2017
20.7% 20.7%
12 Reduce prevalence of current tobacco use
Men who use any kind of tobacco (%)- 55.9, Women who use any kind of tobacco (%)-17.3
15% Relative Reduction during 2017-2020
13 Increase utilization of public health facilities.
Allopathic OPD- Public Health facility- 45031051 IPD- Public Health Facility-2810111
OPD: 18.3%= 53271730 IPD: 7.1%= 3009629
OPD: 8.2%=57640015 IPD: 5.4%=3172149
14 Reduce OOPE (OOPE as a percentage of Total Health Expenditure)
Average out of pocket expenditure per delivery in public health facility- 4225 (NFHS4)
64.8 62.6
Kandhamal_SD Facility Based
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1 Service Delivery - Facility Based 365.34
1.1 Service Delivery 44.61
1.1.1 Strengthening MH Services 12.54
PMSMA activities at State/ District level RCH MH 1.50
At State level RCH MH Lumpsum 500000 5.00 0 -
At District level (<= 5 blocks) RCH MH Per dist 50000 0.50 0 -
At District level (6 to 10 blocks) RCH MH Per dist 100000 1.00 0 -
At District level (11 to 15 blocks) RCH MH Per dist 150000 1.50 1 1.50
At District level (>=16 blocks) RCH MH Per dist 200000 2.00 0 -
Diet services for JSSK Beneficaries (3 days for Normal
Delivery and 7 days for Caesarean)RCH MH - JSSK 6.36
For PMSMA benificaries RCH MH - JSSK Per case 50 0.00 8671 4.34
At SC & PHC(N) DP RCH MH - JSSK Per case 150 0.00 1349 2.02
1.1.1.3 A.1.6.2 Blood Transfusion for JSSK Beneficiaries RCH MH - JSSK Per case 300 0.00 1301 3.90
1.1.1.4 A.1.6.5.1
Antenatal Screening of all pregnant women coming to the
facilities in their first trimester for Sickle cell trait, β
Thalassemia, Haemoglobin variants esp. Haemoglobin E and
Anemia -Refer Hemoglobinopathies guidelines
RCH Blood Cell 0.00 0.00
Integrated lab of all DHHs & SDHs are being equiped under
state budget for screening of pregnant women for
hemoglobinopathies
Special initiatives taken up by CMC, Vellore for screening of all
eligible couples at field level in 3 identified districts in first
phase.
Annexure for Service Delivery (Facility Based)
1.1.1.1 A.1.5.4
Funding: @Rs.5.00 lakhs for state, Rs.0.50 lakhs per dist with
<=5 blocks, Rs.1.00 lakh with 6 to 10 block, Rs.1.50 lakhs with
11 to 15 blocks & Rs.2.00 lakhs with > = 16 blocks, which will
be used as untied grant to be utilised under following
purpose.
1. Transportation of private practitioners
2. Meeting with various stakeholders at State and District
level
3. Award to volunteers & others
4. Mobility cost to doctors and paramedical staff those are
deployed from other facilities for the Clinic day
5. IEC at State and district level for wide publicity of the
programme
1.1.1.2 A.1.6.3
Estimated benificiaries -
1.Diet to benificiaries attending PMSMA - @Rs.50/- per day
2.Diet to beneficiaries addmitted at SC & PHC (N) Delivery
Points where sanctioned beds are not [email protected]/- per
day x 3 days
Diet for other insts. having sanctioned bed strength is
provisioned under State budget.
Page 1 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.1.5 LaQshya Related Activities RCH MH Lumpsum 77760 0.78 1 0.78
Background :
The activity will be implemented in all 95 FRUs of the State.
• In addition to this, 3 nos. of MCH will be covered- SCB,
Cuttack, MKCG, Berhampur, Ganjam, VSS, Burla, Sambalpur,
Activities proposed :
1. Training - proposed under Training (line no. 9.5.1.22)
2.1.Mentoring visit by State team
2.2.Mentoring by district coaching team
3.Awards as per LaQshya guideline- to be proposed in next
year
4.Incentives as per LaQsha guideline following NQAS
scorecard and certification by NHSRC recommended external
assessor
5.Review meeting - District level in existing platform & state
level in half yearly basis.
6.Procurement of equipment/ instrument - proposed under
State budget
7. Mannequin Set- Proposed under Procurement (line no
6.1.1.1.b)
7. Printing- Proposed as per requirement
Details in Annxure
1.1.1.6 Any other (please specify) Per BSU 24000 0.24 0 0.00
A.Pool-RCH, Prg. Division-MH
1.Strengthening of Blood Storage Units (BSU) - Total FRU in
the State -95; Blood Bank funtional in 51FRUs, BSU funtional
in 42 FRU and 2 nos. to be funtional in 2018-19.
Reccuring fund proposed for 44 BSUs @Rs.24000/- per BSU
p.a. -
2.New NH Intervention
2.1.Screening of hyprothyroidisim in preganancy is
implemented in 3 MCHs (SCB, MKCG & VSS) which will be
contimued in 2018-19.
2.2. Review of Maternal Near Miss is being implemeted in all
30 districts
1.1.2 Strengthening CH Services 8.00
1.1.2.1 A.5.1.5
New born screening- Inborn error of metabolism (please give
details per unit cost of screening, number of children to be
screened and the delivery points Add details)
RCH RBSK 0.00 0.00 Not proposed in the current year
Page 2 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.2.2 A.5.1.6
New born screening as per RBSK Comprehensive Newborn
Screening: Handbook for screening visible birth defects at all
delivery points (please give details per unit cost , number of
deliveries to be screened and the delivery points Add details)
RCH RBSK 0.00 0.00
Newborn screening of visible birth defects & functional birth
defects intiated at delivery point (DP) level
Proposal for screening of visible birth Defects -
1.One day training of one MO & one SN /ANM from all new
DPs qualified in the current year - proposed in Training
2.Refresher training of trained service providers (MO+SN) for
one day of all first referral units
3.Handbook for MOs & SNs of all DPs - proposed in Printing
4.Display boards (On birth defect, vision & ROP screening) at
all DPs for general awareness - proposed in IEC/BCC
Proposal for screening of functional birth Defects -
1. ROP Screening- Equipment/instruments (Indirect
Ophthalmoscope) already provided to DEICs functioning at
DHHs.Training on RoP for Ophthalmologist already
provisioned in 2016-17 & 2017-18. .No additional fund
required.
2. New Born Hearing Screening: Equipment for new born
hearing screening provided to all DEICs (BOA, OAE).
Audiologist & Speech Therapists of DEIC have been oriented
at AYJNIHH, Odisha. No additional fund required.
Page 3 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.2.3 A.5.2Referral Support for Secondary/ Tertiary care (pl give unit cost
and unit of measure as per RBSK guidelines) - RBSKRCH RBSK Lumpsum 800000 8.00 1 8.00
1.Neural Tube Defect - Agencies tied up are SCB MCH & AIIMS
BBSR & budgeted @Rs.35000/- per case
2.Talipes (Club foot) - Agencies tied up are CIIT Delhi. Club
foot clinic operational in 11 facilities (SCB, VSS, MKCG, Capital
Hosp., SVPPGIP, DHH Mayurbhanj, DHH Balaore, DHH
Keonjhar, DHH Kalahandi, DHH Koraput & RGH Rourkela). 2
more club foot clinic will be functional during 2018-19 (DHH
Kendrapara & DHH Kandhamal) & budgeted @Rs.3000/- per
case
3.Development Dysplasia of the hip- Agencies tied up are SCB
MCH, SBNIRTAR & AIIMS BBSR & budgeted @Rs.1000/- per
case
4.Congenital Cataract - Agency tied up is LVPEI BBSR &
budgeted @Rs.20000/- per case
5.Congenital Deafness - Agency tied up is ALPS India for
supply of digital & programmable hearing aid & budgeted
@Rs.10000/- per case
6.Congenital Heart Disease - Agencies tied up are SCB MCH &
Narayana Hrudalaya Ltd. & budgeted @Rs.160000/- per case
7.Retinopathy of prematurity - Agency tied up is LVPEI BBSR
& budgeted @Rs.10000/- per case
8.Rheumatic Heart Disease- Agencies tied up are SCB MCH &
Narayana Hrudalaya Ltd. & budgeted @Rs.110000/- per case
9.Vision Impairment (Strabismus) - Agencies tied up are AIIMS
BBSR & LVPEI BBSR & budgeted @Rs.8500/- per case
10.Cleft Lip + Cleft Palate- Agencies tied up are SCB MCH,
MKCG MCH, Smile Train & Mission Smile empanlled hospitals -
Free of cost
1.1.2.4 Any other (please specify) RCH RBSKPer unit for 6
months60000 0.60 0 0.00
Post Surgery Crtical Care Unit for new born at SVPPGIP,
Cuttack
After intiation of new born screening under RBSK, children
identified with birth defects such as neural tube defect,
hydrocephalus, hypospadius, inprforated annus etc. are
referred to SVPPGIP as a tertiary referral facility. Such
conginental defect children after surgery require critical care
at SVPPGIP. To address these need, a 6 bedded Post Surgery
Crtical Care Unit for new born is to be devloped at SVPPGIP.
1.1.3 Strengthening FP Services 0.00
1.1.3.1 A.3.1 Terminal/Limiting Methods 0.00
Page 4 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.3.1.1 A.3.1.1 Female sterilization fixed day services RCH FP 0.00 0.00
Not proposed except POL /DOL cost for transportation of
empallened surgeon outside the hospital for organising fixed
day services. Budgeted under 2.2.1.
1.1.3.1.2 A.3.1.2 Male Sterilization fixed day services RCH FP 0.00 0.00 Mentioned above
1.1.3.2 A.3.2 Spacing Methods 0.00
1.1.3.2.1 A.3.2.1 IUCD fixed day services RCH FP 0.00 0.00 Not proposed.
1.1.3.2.1 A.3.7.5Other activities (demand generation, strengthening service
delivery etc.)RCH FP 0.00 0.00 Budgeted under IEC/BCC component
1.1.3.3 Any other (please specify) RCH FP
1.1.4 Strengthening AH Services 0.00
1.1.4.1 AH 0.00 0.00
1.1.4.2 Any other (please specify) AH 0.00 0.00
1.1.5 Strengthening DCP Services 21.31
1.1.5.1 F.1.2.e Dengue & Chikungunya: Case management DCP NVBDCP Per Block 1000 0.01 12 0.12
Efficient case management requires proper and timely
diagnosis. For dengue and Chikungunya, ELISA based
diagnosis is the confirmatory method of diagnosis. This facility
is availbale at 38 sentinel sites confined to DHHs, MCHs and
RMRC. It is therefore necessary to send blood serum
dsamples of suspected dengue/chk cases to the sentinel site
laboratory.
Proposed Activity 2018-19
1. Serum transportation cost is proposed which is to be kept
at district level, to be given to the serum transporter for ta/da
etc.
Case Management: Training on Clinical Management of
dengue and chikungunya has been proposed under
Budgetcode 9.5.12.2(Management of DF/DHF/DSS for
Dengue, Chikungunya(Medicine & Pediatric Specialist))
1.1.5.2 F.1.3.iAcute Encephalitis Syndrome (AES)/ Japanese Encephalitis
(JE): Rehabilitation Setup for selected endemic districtsDCP NVBDCP 0 0 0.00 0.00 Not Proposed
Lymphatic Filariasis: Morbidity Management DCP NVBDCP 0.00 Targeted districts - 15 (Out of 30 districts)
Demonstration of Morbidity Management for lymphodema
patient at hign burden sc for LF.DCP NVBDCP Per SC 300 0.00 0 0.00
Hydrocelectomy DCP NVBDCP Per Case 750 0.01 0 0.00
Incentive to the support staff of the morbidity management
clinic attending Lymphadema casesDCP NVBDCP Per Case 30 0.00 0 0.00
Total Budged proposed@ Rs 30 per case x10 cases per month
x 12 month x 15 district= Rs.0.54 Lakhs
1.1.5.4 G.1.1Case detection & Management: Specific -plan for High
Endemic DistrictsDCP NLEP Lumpsum 2119150 21.19 1 21.19 The detail guideline will be provided by the NLEP division.
1.1.5.5 G.1.2 Case detection & Management: Services in Urban Areas DCP NLEP 0 0.00 0 0.00 Covered under Line item 1.1.5.4
1.1.5.6 G.2.4 Support to govt. institutions for RCS DCP NLEP Per Case 3000 0.03 0 0.00Proposed cost norm per case:Rs.3000/-
1.1.5.3 F.1.4.a
Page 5 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.5.7 Any other (please specify) 0.00 0.00
1.1.6 Strengthening NCD Services 0.00
1.1.6.1 O.2.8.2 Integration with AYUSH at District NCD Cell / Clinic NCD NPCDCS Per Quarter 50000 0.50 0 0.00
Taken in one district in the year 2017-18. Training completed
Proposal 2018-19:
1. Quarterly CME (continued Medical Education) proposed in
the same district for strenthening implementation of the
same scheme
2. Mentoring of clinical service providers by monitors (Dist.
Ayurvedic/ Homeopathic Medical Officers) of AYUSH Deptt.
1.1.6.2 O.2.8.3 Integration with AYUSH at CHC NCD Clinic NCD NPCDCS 0.00 0.00 Budget integrated in 1.1.6.1
1.1.6.3 B.29.1.6Recurring Grant-in-aid (For newly selected district): Medical
Management including Treatment, surgery and rehabHSS NPPCF 0.00 0.00
1.1.6.4 B.29.2.3Recurring Grant-in-aid (For ongoing selected district): Medical
Management including Treatment, surgery and rehabHSS NPPCF Per district 250000 2.50 0 0.00
NPPCF programme is being implemented in 3 districts i.e.
Angul, Nayagarh & Nuapada decided as per survey report
issued by GoI.
1.1.6.5 B.13.4 Pradhan Mantri National Dialysis Programme HSS HSS 0.00 0.00
1.1.6.6 Any other (please specify) 0.00 0.00
1.1.7 Strengthening Other Services 2.76
1.1.7.1 A.6.1 Special plans for tribal areas RCH RCH 0.00 0.00
1.1.7.2 A.11.3 LWE affected areas special plan RCH RCH 0.00 0.00
Transfusion support to patients with blood disorders and for
prevention programsHSS Blood Cell 2.76
Provisioned under State budget.
1.Exemption of service charges for paitents with blood
disorder (for which blood banks will be reimburshed
@Rs.350/- per unit of blood)
2.Transportation cost @Rs.500/- p.m. to all blood disorder
cases for attending blood bank for blood
transfuison/treatment at appropriate institutions
No additional budget proposed under NHM.
Proposal under NHM
1.Operational expenses for 3 Day Care Centers appproved in
2017-18.
Head of expenses -
1.1.HR & Medicine, consumables proposed in respective
heads
1.2.Other recurring cost
2.Automation of Blood grouping, cross matching & anti-
body screening Operational expenses for 3 Day Care Centers HSS Blood Cell 0.00 2.76
HR & Medicine, consumables HSS Blood Cell 0.00 0.00 proposed in respective heads
Other recurring cost HSS Blood Cell Per Unit 276000 2.76 1 2.76
Automation of Blood grouping, cross matching & anti-body
screening HSS Blood Cell Per Case 240 0.00 0 0.00 At high case load blood banks (>10000 blood collection p.a.)
1.1.7.4 B18.1 Universal Health Coverage (pilot) HSS HSS 0.00 0.00 Scaled up in 310 HWCs, budgeted under 1.1.7.5
1.1.7.3 B14.3
Page 6 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.1.7.5 B18.3
Strengthening of Subcenters as first post of call to provide
comprehensive primary healthcare: strengthening of in-house
services/ through hub and spoke model (PPP model to be
budgeted under FMR 15.9)
HSS HSS/NHSRC-CP Lumpsum 0.00 0.00
1.1.7.7 Any other (please specify) 0.00 0.00
1.2 Beneficiary Compensation/ Allowances 200.52
1.2.1Beneficiary Compensation under Janani Suraksha Yojana
(JSY)137.67
1.2.1.1 A.1.3.1 Home deliveries RCH MH - JSY Per benificiary 500 0.01 95 0.48
1.2.1.2 A.1.3.2 Institutional deliveries 137.19
1.2.1.2.a A.1.3.2.a Rural RCH MH - JSY Per benificiary 1400 0.01 9008 126.11
1.2.1.2.b A.1.3.2.b Urban RCH MH - JSY Per benificiary 1000 0.01 1060 10.60
1.2.1.2.c A.1.3.2.c C-sections RCH MH - JSY Per case 3000 0.03 16 0.48
1.2.2 Beneficiary Compensation under FP Services 62.80
1.2.2.1 A.3.1 Terminal/Limiting Methods 51.03
Compensation for female sterilization (Provide breakup for
cases covered in public facility, private facility. Enhanced
Compensation Scheme (if applicable) additionally provide
number of PPS done.
Female sterilization done in MPV districts may also be
budgeted in this head and the break up to be reflected)
RCH FP 49.27
At Public Sector RCH FP Per benificiary 2000 0.02 1781 35.62
At Private Sector RCH FP Per benificiary 3000 0.03 107 3.21
For PPS at public sector RCH FP Per benificiary 3000 0.03 348 10.44
1.2.2.1.b A.3.1.4
Compensation for male sterilization/NSV (Provide breakup
for cases covered in public facility, private facility. Male
sterilization done in MPV districts may also be budgeted in
this head and the break up to be reflected)
RCH FP Per benificiary 2700 0.03 65 1.76
1.2.2.2 A.3.2 Spacing Methods 11.77
1.2.2.2.a A.3.2.2
Compensation for IUCD insertion at health facilities (including
fixed day services at SHC and PHC) [Provide breakup: Private
Sector (@Rs. 75/insertion for EAG states)]
RCH FP Per case 75 0.00 88 0.07
Compensation for benificiaries
- At public health institutions - Not proposed, met out of IMEP
fund under State budget
- At private institutions - Budgeted for 5000 cases as per last
years achievment
1.2.2.1.a A.3.1.3
Page 7 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.2.2.2.b A.3.2.3PPIUCD services: Compensation to beneficiary@Rs
300/PPIUCD insertionRCH FP Per case 300 0.00 3639 10.92
1.2.2.2.c A.3.2.4PAIUCD Services: Compensation to beneficiary@Rs 300 per
PAIUCD insertion) RCH FP Per case 300 0.00 263 0.79
1.2.2.2.d A.3.7.3 Injectable contraceptive incentive for beneficiaries RCH FP 0.00 0.00 Not applicable
1.2.2.3 A.3.6 Family Planning Indemnity Scheme RCH FP Per case 50 0.00 0 0.00Expenditure till Dec'17 - 65%. Proposed as approved in last
year.
1.2.2.4 Any other (please specify) RCH FP Per Inst 1000 0.01 0 0.00
Urban Area Initiatives :
Handholding support to accrediated private institutions
providing FP services @Rs.1000/- per institution (3
participants per inst.)
1.2.3 Others (including PMSMA, any other) 0.06
1.2.3.1 G.2.3 Welfare allowance to patients for RCS DCP NLEP Lumpsum 6000 0.06 1 0.06
Proposed cost norm per case: Rs.8000/- (Rs. 5000/- at RCS
Centre & Rs. 3000/- at the time of follow up)
1.2.3.2 Any other (please specify) 0.00 0.00
1.3 Operating Expenses 120.21
1.3.1Operating expenses for Facilities (e.g. operating cost rent,
electricity, stationary, internet, office expense etc.)46.81
SNCU (Recurring cost) RCH CH 11.64
Proposal 2018-19 :
1. New 12 beded - 4
A. SDH Anandpur
B. City Hospital Behrampur
C. SDH Udala
D. SDH Patnagarh
2. Expansion of 2 SNCUs (Bhadrak & Rayagada) from 12
beded to 24 beded
3. Ongoing SNCUs - To continue
For 12 beded RCH CH
- 26 SNCUs for 12 months RCH CH Lumpsum 1164000 11.64 1 11.64
Approved budget
For 26 SNCU @ Rs. 6.00 Lakhs per annum & 2 SNCUs (DHH
Bhadrak & Rayagada) @ Rs. 4.50 Lakh for 9 Months
- 4 SNCUs for 3 months RCH CH Per Unit 150000 1.50 0 -
For 24 beded RCH CH
- 9 SNCUs for 12 months RCH CH Per Unit 1000000 10.00 0 -
- 2 SNCUs for 3 months RCH CH Per Unit 250000 2.50 0 - (DHH Bhadrak & Rayagada)
1.3.1.1. A.2.2.1
Page 8 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
For 36 beded RCH CH Per Unit 1700000 17.00 0 -
For 48 beded for 12 months RCH CH Per Unit 2800000 28.00 0 - SVPPGIP, Cuttack proposed as 48 beded SNCU.
1.3.1.2 A.2.2.2 NBSU RCH CH Per Unit 175000 1.75 1 1.75
1.3.1.3 A.2.2.3 NBCC RCH CH Per Unit 20000 0.20 25 5.00
1.3.1.4 A.2.5 NRCs RCH CH Lumpsum 2145000 21.45 1 21.45
Proposal:1
For operational NRCs with less than 50% BO @ Rs 3.9 lakhs
per NRC
Proposal:2
For operational NRCs with more than 50% BO @ Rs 7.8 lakhs
per NRC
Proposal:3
Upgradation of 2 NRCs from 10 to 15 bedes @ Rs. 11.7 lakhs
per NRC
Proposal:4
For other 3 ten bedded NRCs with 10 beds for which report is
awaited OPEX recommended @ Rs 7.8 lakhs per NRC
Proposal:5
For rest 7 NRCs to be made functional @ Rs 5.85 lakhs per
NRC
Details at NRC Annex.
Family participatory care (KMC) RCH CH 1.25
For 12 months RCH CH Per Unit 100000 1.00 1 1.00
For 3 months RCH CH Per Unit 25000 0.25 1 0.25
AH/ RKSK Clinics RCH AH 0.66
Operational expenses for functional AFHC RCH AH Per Unit 6000 0.06 11 0.66
Renovation cost of existing AFHC RCH AH Per Unit 10000 0.10 0 0.00
1.3.1.7A.5.1.4/
B16.1.6.3.5
DEIC (including Data card internet connection for laptops and
rental)RCH RBSK Per DEIC 336000 3.36 1 3.36 Operational cost of DEIC proposed as per last year's approval
1.3.1.8O.2.2.1.3/
O1.1.3.1
District NCD Clinic: Strengthening of lab, Mobility ,
Miscellaneous & ContingenciesNCD NPCDCS Lumpsum 25000 0.25 1 0.25
Proposal: Revamping NCD clinics of 95 major institutions (of
which 32 are DHHs)
1. Non recurring
1.1 Strengthening of Lab- Rs. 8.00 Lakh x 32. Budget shifted to
FMR. 6.1.1.23.c
1.1 Furniture, equipment, computer- Rs. 1.00 Lakh x 8= Rs.
8.00 Lakhs
2. Recurring
2.1 Human Resource- To be mobilised from the system
2.2 Drugs & consumables- From State supply
2.3 Transportation of referred/ serious patients- Existing 108
to be mobilised
2.4 Contingency- Rs. 25,000/- per institution x 32
1.3.1.1. A.2.2.1
1.3.1.5
1.3.1.6 A.4.1.3
Page 9 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
CHC NCD Clinic: Mobility , Miscellaneous & Contingencies NCD NPCDCS 1.05
Proposal: Revamping NCD clinics of 95 major institutions (of
which 63 are SDH/ CHCs)
1. Non recurring
1.1 Strengthening of Lab: Shifted to FMR. 6.1.1.23.d
1.2 Furniture, equipment, computer- ( Funds approved in
2016-17. However, 36 SDH/ CHCs could not procure the same
and funds not kept as committed unspent balance)
2. Recurring
2.1 Human Resource- To be mobilised from the system
2.2 Drugs & consumables- From State supply
2.3 Transportation of referred/ serious patients- Existing 108
to be mobilised
2.4 Contingency
Strengthening of Lab NCD NPCDCS Per unit 500000 5.00 1 0.00 Shifted to FMR. 6.1.1.23.d
Furniture, equipment, computer NCD NPCDCS Per unit 100000 1.00 1 1.00
Contingency NCD NPCDCS Per unit 5000 0.05 1 0.05
1.3.1.10 O.2.2.1.5 PHC level: Mobility , Miscellaneous & Contingencies NCD NPCDCS 0.00 0.00 Not Proposed
1.3.1.11 O.2.2.1.7 Sub-Centre level: Mobility , Miscellaneous & Contingencies NCD NPCDCS 0.00 0.00 Not Proposed
Maintenance of office equipment for DTC, DRTB centre and
Labs (under RNTCP)DCP RNTCP 0.40
State Level DCP RNTCP Lumpsum 100000 1.00 0 0.00
Office Equipment at STC,STDC,IRL,SDS, DR TB Centre
(maintenance includes AMC, software and hardware
upgrades, Printer Cartridges,Internet expenses and repairs of
photocopier, fax, OHP etc)
District Level DCP RNTCP Per DTC 40000 0.40 1 0.40
Office Equipment at DTC (maintenance includes AMC,
software and hardware upgrades, Printer Cartridges,Internet
expenses and repairs of photocopier, fax, OHP etc)
1.3.1.9 O.2.2.1.4
1.3.1.12 H.5
Page 10 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1.3.1.13 Any other (please specify) RCH CH Per LMU 105000 1.05 0 0.00
Pool-RCH, Prg. Division - CH
1.Proposal (new activity)
1.1 Establishment of Lactation Management Unit (LMU) at
MKCG MCH Berhampur
Operational expenses - Rs.1.05 lakhs as per GoI guideline
1.2 Establishment of Comprehensive Lactation Management
Unit at tertiary institutions at SCB MCH Cuttack & Capital
Hospital BBSR
Non recurreing expenses- Equipment & instrument proposed
under procurement (line no. 6.1.1.2.b) & Civil cost under
Infrastructure component
Operational expenses - To be budgeted in next year
2.Proposal - establishment of PICU & ETAT (Budgeted under
state specific initiative for accelerated reduction of IMR/MMR
i.e. SAMMPurNA Prospective target - 20 by 2020
1.3.2 Other operating expenses 73.40
1.3.2.1 B.23.1Power Back-up for blood bank/storage (ideally integrated
power back up for facility)HSS HSS 0.00 0.00
Already in place at all blood banks / blood storage units
(either exclusive or integrated), hence no budget proposed.
1.3.2.2 B.29.1.3Recurring Grant-in-aid (For newly selected districts under
NPPF): Laboratory Diagnostic facilitiesHSS NPPCF Per district 0.00 0.00 No new districts targeted in 2018-19
1.3.2.3 B.29.2.2Recurring Grant-in-aid (For ongoing selected districts under
NPPF): Laboratory Diagnostic facilitiesHSS NPPCF Per district 150000 1.50 0 0.00
Budgetd for 3 targeted districts i.e. Angul, Nayagarh &
Nuapada
1.3.2.4 C.1.mConsumables for computer including provision for internet
access for strengthening RIRCH RI Per DHH 11250 0.11 1 0.11 Budget Proposed @ Rs. 11250/ per annum Per DHH
1.3.2.5 B.27.1.3Miscellaneous including Travel/ POL/ Stationary/
Communications/ Drugs etc.HSS NPPC 0.00 0.00
Page 11 of 280
Kandhamal_SD Facility Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Any other (please specify) HSS 73.28
Pool:HSS, Prog. Divs.HSS
Strengthening Ancillary services in 95 major Hospitals-FRUs
(Old FMR B14.5)
Areas of interventions :
• Housekeeping and cleanliness services
• Hospital linen and laundry services
• Security services
Modalities of implementation : Agencies
have been engaged through outsourced
basis.
Total amount approved last year - Rs.2,388.17 lakhs
- Insts. having < 30 beds (106 beds)
- Insts. having > 30 beds (10240 beds)
Strengthening Ancillary services in 95 major Hospitals HSS 73.28
Institution Having <30 beds HSSPer bed per
day58.66 0.00 0 0.00
Institution Having >=30 beds HSSPer bed per
day66.48 0.00 110230 73.28
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 NPCCF
5 RNTCP
6 NLEP
7 NVBDCP
8 NPCDCS
9 NPPC
Unit cost will be finalised as per tender rate.
1.3.2.6
B14.5
Page 12 of 280
Kandhamal_SD Community Based
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
2 Service Delivery - Community Based 110.27
2.1 Mobile Units 0.00
2.1.1 B11 National Mobile Medical Units (MMU) 0.003 MMUs approved for riverian areas of Koraput,
Malkanagiri & Kendrapara districts
2.1.1.1 B11.1.1 Capex HSS HSS 0.00 0.00 Already provisioned.
2.1.1.2 B11.1.2 Opex HSS HSSPer MMU for
6 months270000 2.70 0 0.00
Total cost estimated per MMU p.a. Rs.5.40 lakhs per annum
Budget proposed 2018-19 : @Rs.45000/- p.m. per MMU for 6
months
2.1.2 B11.2National Mobile Medical Vans (smaller vehicles) and
specialised Mobile Medical Units0.00
2.1.2.1 B11.2.1 Capex HSS HSS 0.00 0.00 Cost met out of State Budget
2.1.2.2 B11.2.2 Opex HSS HSS 0.00 0.00 Cost met out of State Budget
2.1.3 Other Mobile Units 0.00
2.1.3.1 B11.2.4 Blood collection and Transport Vans HSS Blood CellPer Blood
collection van420000 4.20 0 0.00
Operational cost for 9 Mobile blood collection vans.
1.POL/DOL @Rs.30000/- p.m. per unit
2.Contigency @Rs.5000/- p.m. per unit
Total : Rs.35000/- p.m. per unit proposed as approved last
year
2.1.3.2 I.2.8 Grant in aid for Mobile Ophthalmic Units NCD NPCB Per unit 3000000 30.00 0 0.00
2.1.3.3 Any other (please specify) 0.00 0.00
2.2 Recurring/ Operational cost 68.66
2.2.1 A.3.3POL for Family Planning/ Others (including additional mobility
support to surgeon's team if req)RCH FP Lumpsum 50000 0.50 1 0.50
1. Mobilisation of Surgeons (Public/Private) for providing FDS
(Reimburshment will be done as per society norms)
@Rs.50000/- per district x 30 district = Rs.15.00 lakhs
2.POL provision for transporting contraceptive commodities
from State to district - Supply chain management from state
warehouse to district level will be ensured through this
funding - Rs.2.00 lakhs
2.2.2 A.4.1.4 Mobility & Communication support for AH counsellors RCH AH 0.00 0.00
State has engaged Counsellors for all instituions upto FRUs
level & placed at Integrated Counselling Centre. Hence, no
additional cost for communication & mobility proposed for
AH Counsellors.
2.2.3 A.5.1.3 Mobility support for RBSK Mobile health team RCH RBSK Per team 276000 2.76 24 66.24
2.2.4 B16.1.6.3.6 Support for RBSK: CUG connection per team and rental RCH RBSK Per team 3000 0.03 24 0.72
2.2.5 B11.2.5
National Mobile Medical Vans (smaller vehicles) and
specialised Mobile Medical Units: Recurring grants for POL
and others
HSS HSS 0.00 0.00
2.2.6 C.1.r Teeka Express Operational Cost RCH RI 0.00 0.00 Not proposed. Volunteer supported AVD system in place.
Annexure for Service Delivery (Community Based)
Page 13 of 280
Kandhamal_SD Community Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
2.2.7 C.1.t JE Campaign Operational Cost RCH RI 0.00 0.00Not proposed in the current year. Campaign has been taken
up in 2016-17 & 2017-18 covering 17 districts.
2.2.8 C.6 Pulse Polio operating costs RCH RI 31193000 311.93 0 0.00
2.2.9 C.1.s Measles Rubella SIA operational Cost RCH RI 0.00 0.00 Taken up in all 30 districts in 2017-18. No new proposal.
2.2.10 F.1.5.cKala-azar Case search/ Camp Approach:
Mobility/POL/supervisionDCP NVBDCP 0.00 0.00 Not proposed as Kala-azar is not reported.
2.2.11 Any other (please specify) RCH RBSK Per MHT 5000 0.05 24 1.20Pool - RCH, Prog. Division - RBSK
Operational cost for MHT
2.3 Outreach activities 41.61
2.3.1 Outreach activities for RMNCH+A services 14.18
2.3.1.1 A.1.2
Integrated outreach RCH services (state should focus on
facility based services and outreach camps to be restricted
only to areas without functional health facilities)
14.01
2.3.1.1.a A.1.2.1 Outreach camps RCH MH 0.00 0.00State has mandated to strengthen Facilities for ensuring
service delivery for its population. Camp
2.3.1.1.b A.1.2.2 Monthly Village Health and Nutrition Days RCH MH Per session 100 0.00 14008 14.01
1.Regular session - Budgeted in this line item
2.Sessions in hard to reach notified villages - Budgeted under
state support scheme SAMMPurNA
2.3.1.2 A.1.5.1 Line listing and follow-up of severely anaemic women RCH MH Per case 100 0.00 174 0.17
Provision is for 13 HPDs for identification, line listing of sever
anemic pregnant women by HW (F) & confirmation of HB%
(<7gm%) at faclity level by MO & initiate treatment along with
follow up visit at least for two consicutive months.
Budgeted under 8.4.10
2.3.1.3 A.1.5.2 Line listing of the women with blood disorders RCH MH 0.00 0.00
Funds provisioned under state budget
Respective blood banks are maintaining database of blood
disorder cases. Under state budget, provision has been made
for monthly transportation allowance @Rs.500/- p.m. to
each blood disorder cases for attending blood banks for
transfusion.
2.3.1.4 A.1.5.3Follow up mechanism for the severly anemic women and the
women with blood disordersRCH Blood Cell 0.00 0.00
Provision for follow up of severly anemic women have been
proposed under 2.3.1.2 & women with blood disorder cases
out of 2.3.1.3.
2.3.1.5 A.4.2.2 Organizing Adolescent Health day RCH AHPer AHD
session1900 0.02 0 0.00
Complete coverage of 2 RKSK districts namely Dhenknal &
Bolangir (where peer education programme has been
implemented)
2.3.1.6 A.4.2.3Organising Adolescent Friendly Club meetings at subcentre
level RCH AH Per meeting 500 0.01 0 0.00
For Dhenknal & Bolangir
2.3.1.7 A.6.2 Tribal RCH: Outreach activities RCH RCH 0.00 0.00
2.3.1.8 A.11.2 Services for Vulnerable groups RCH RCH 0.00 0.00
Page 14 of 280
Kandhamal_SD Community Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
2.3.1.9 C.1.f
Focus on slum & underserved areas in urban
areas/alternative vaccinator for slums (only where regular
ANM under NUHM not engaged)
RCH RI Per session 750 0.01 0 0.00
2.3.1.10Mobility support for mobile health team/ TA/DA to
vaccinators for coverage in vacant sub-centersRCH RI Per session 150 0.00 0 0.00
1.For vaccant SCs
Projected unit cost - Rs.150/- per session, budget proposed
for 6 months as new recuirtment will expected to complete
by Oct'18
2.For difficult to reach session sites - 2020 such sites have
been identified where integrated VHND & FID sessions are
being held with the team approach under funding from State
budget.2.3.2 Outreach activities for controlling DCPs & NCDs 6.71
2.3.2.1 B18.2 Universal health check-up and screening of NCDs HSS HSS/ NPCDCS 0.00 0.00
No new proposal. Same 7 districts and 2 urban cities will be
targeted to cover 65% of the target population. Budget
available as committed unspent balance will be utilised for
the same.
Approval in main PIP under B.22.7
Approval in 2nd supplementary PIP under B.22.7
2.3.2.2 G.2.5 DPMR: At camps DCP NLEP 0.00 0.00Not Proposed
Proposed to be done at institution level
DMHP: Targeted interventions at community level Activities &
interventions targeted at schools, colleges, workplaces, out of
school adolescents, urban slums and suicide prevention.
NCD NMHP 6.45
A. Ongoing Initatives:
1. Screening camp
2. Life Skill Education for School Techers/ College teachers-
3. Counselling Sessions at High Schools or Colleges
B. New Initatives
4. Work place stress management sessions
Screening camp NCD NMHP Per Camp 50000 0.50 6 3.00Budget Proposed @ Rs. 50000/- per camp per year for 23
districts based on assessibility factors
Life Skill Education for School Techers/ College teachers NCD NMHP Per Teacher 3500 0.04 70 2.45Budget proposed @Rs.3500/- per teacher including LSE
training manual
Counselling Sessions at High Schools or Colleges NCD NMHP Per Session 1000 0.01 70 0.70 Budget proposed @ Rs.1000/- per institution per year
Work place stress management sessions NCD NMHP Per Session 5000 0.05 6 0.30Budget proposed @ Rs.5000/-per session for 6 session per
year X 23 districts
2.3.2.4 I.1.5Recurring grant for collection of eye balls by eye banks and
eye donation centresNCD NPCB Pair of corneas 2000 0.02 0 0.00
2.3.2.5 M.2.1.1Tobacco Cessation Centre (TCC): Weekly FGD with the
tobacco usersNCD NTCP Per Session 500 0.01 52 0.26
Weekly focus group discussion at all integrated counselling
Centres
Buget proposed for 30 districts x 52 weeks= 1560 sessions
2.3.3 Outreach activities at School level 20.71
2.3.3.1 A.2.10.1
One time Secreening to Identify the carriers of Sickle cell trait,
β Thalassemia, Haemoglobin variants at school especially
class 8 students
RCH Blood Cell Per Camp 3000 0.03 30 0.90 Unit cost : Rs.3000/- per camp
2.3.2.3 J.1.3
Page 15 of 280
Kandhamal_SD Community Based
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
2.3.3.2 I.1.3Screening and free spectacles to school children @ Rs.275/-
per caseNCD NPCB
Pair of
spectacls350 0.00 2779 9.73
Unit cost is revised from Rs. 275/- to Rs. 350/- (Ref. VC with
GoI on 19.01.2018)
2.3.3.3 I.1.4Screening and free spectacles for near work to Old Person
(New component) @Rs.100/- per caseNCD NPCB
Pair of
spectacls350 0.00 1739 6.09 Unit cost Revised as per recommendation of GoI
2.3.3.4 M.1.2 NTCP Programme at School level 4.00
2.3.3.4.1 M.1.2.1 Coverage of Public School NCD NTCP Per School 10000 0.10 15 1.50
@ 15 Model Schools Per district. With followup programme
at every six months.
2 visits proposed for each school @ Rs. 5000 x 2= Rs.10000
2.3.3.4.2 M.1.2.2 Coverage of Pvt. School NCD NTCP Per School 10000 0.10 5 0.50
@ 5 Model Pvt. Schools Per district. With followup
programme at every six months
2 visits proposed for each school @ Rs. 5000 x 2= Rs.10000
2.3.3.4.3 M.1.2.3 Coverage of Public School in other's school programme NCD NTCP 0.00 0 0.00
Screening for substance abuse and there after counselling is
being done by RBSK team as part of 4D screening and
services. Orientation proposed for RBSK team members at
district level.
2.3.3.4.4 M.1.2.4 Coverage of Pvt. School in other's school programme NCD NTCP 0.00 0 0.00 Not Proposed
2.3.3.4.5 M.1.2.5 Sensitization campaign for college students NCD NTCP Per College 20000 0.20 10 2.00
@ 10 Govt/ Pvt./ Technical Colleges Per district. With
followup programme at every six months
2 visits proposed for each school @ Rs. 10000 x 2= Rs.20000
2.3.4 Any other (please specify) RNTCP 0.00 0.00
Pool: DCP
Programme Division RNTCP
1. Urban TB Control plan
Not Approved
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 NLEP
5 NVBDCP
6 NPCB
7 NPCDCS
8 NTCP
9 NMHP
Page 16 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
3 Community Interventions 497.03
3.1 ASHA Activities 412.59
3.1.1 Performance Incentive/Other Incentive to ASHAs 297.58
3.1.1.1 Incentive for MCH Services 146.15
JSY Incentive to ASHA RCHMH-JSY/NHSRC-
CP46.63
For Rural area RCHMH-JSY/NHSRC-
CPPer case 600 0.01 7207 43.24
For Urban area RCHMH-JSY/NHSRC-
CPPer case 400 0.00 848 3.39
3.1.1.1.2 B1.1.3.2.6ASHA incentive under MAA programme @ Rs 100 per ASHA
for quarterly mother's meeting RCH CH/NHSRC-CP 0.00 0.00
Not seprately proposed, integrated with existing Home Based
Neonetal Care (HBNC) programme
3.1.1.1.3 B1.1.3.2.1 Incentive for Home Based Newborn Care programme RCH CH/NHSRC-CP Per Newborn 250 0.00 7922 19.81
Incentive for community follow up of SNCU discharge cases as
per HBNC schedule after discharge from SNCU is also included
under this line item.
3.1.1.1.4 B1.1.3.2.2Incentive to ASHA for follow up of SNCU discharge babies and
for follow up of LBW babiesRCH CH/NHSRC-CP Per case 200 0.00 2086 4.17
3.1.1.1.5 B1.1.3.2.4Incentive for referral of SAM cases to NRC and for follow up
of discharge SAM children from NRCsRCH CH/NHSRC-CP
Per NRC
discharged
child
150 0.00 202 0.30
3.1.1.1.6 B1.1.3.2.7Incentive for National Deworming Day for mobilising out of
school childrenRCH CH/NHSRC-CP Per ASHA 200 0.00 1549 3.10 @Rs.100/- each round for 2 rounds
3.1.1.1.7 B1.1.3.2.8Incentive for IDCF for prophylactic distribution of ORS to
family with under-five children. RCH CH/NHSRC-CP
Per ORS
Packet1 0.00 79598 0.80
Rs.1/- per ORS packet prepositioned in the family of under
five children during diarrhoea.
3.1.1.1.8 B1.1.3.5.1National Iron Plus Incentive for mobilizing WRA (non pregnant
& non-lactating Women 20-49 years)HSS
MH/AH/CH/NH
SRC-CP0.00 0.00
Annexure for Community Intervention
3.1.1.1.1 A.1.3.4
Page 17 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
3.1.1.1.9 B1.1.3.5.2National Iron Plus Incentive for mobilizing children and/or
ensuring compliance and reporting (6-59 months)HSS
MH/AH/CH/NH
SRC-CP0.00 0.00
3.1.1.1.10 B1.1.3.5.3 National Iron Plus Others HSSMH/AH/CH/NH
SRC-CP0.00 0.00
ASHA Incentive under Immunzation RCH RI/NHSRC-CP 32.57
1. For full immunisation in first year
2. For ensuring complete immunisation upto 2nd year of age
3.For DPT booster at the age of 5-6 years
Budget Revised as per GoI Recommendation
For full immunisation in first year RCH RI/NHSRC-CPPer
Beneficiary100 0.00 12581 12.58
For ensuring complete immunisation upto 2nd year of age RCH RI/NHSRC-CPPer
Beneficiary75 0.00 10694 8.02
For DPT booster at the age of 5-6 years RCH RI/NHSRC-CPPer
Beneficiary50 0.00 23934 11.97
Any other ASHA incentives (please specify) RCH NHSRC-CP 38.78
ASHA incentive for supporting pregnant women to be in non-
anemic status (HB% >11gm%)RCH MH Per case 200 0.00 5203 10.41
Incentive to ASHA @ Rs. 200/- per case with following
conditions.
Anaemic pregnant women (Hb <11 gm/dl) during initial
assessment (1st or 2nd or 3rd ANC) should be non anaemic
(Hb >11 gm/ dl) during 4th ANC or at the time of delivery.
Incentive for mobilization of benificiaries to VHND RCH MH Per session 200 0.00 12607 25.21 Deliverable - 80% targeted beneficiaries (Pregnant woman,
PNC mother & Children 0-3yrs) mobilized to attend VHND
ASHA incentive for confirmation of maternal death RCH MH Per case 150 0.00 22 0.03 Deliverables - Incentive is allowed after confirmation of
maternal death in CB MDR
Mobilise and accompany suspected high risk pregnant
women to ICTC or FICTC and ensure HIV and RPR testing
during ANC (MH component)
RCH MH Per case 100 0.00 173 0.17
Deliverables - Pregnant women mobilised for testing at
ICTC/FICTC for confirmation of HIV
Incentive for accompanying abortion case for surgical
interventionRCH MH Per ASHA 150 0.00 260 0.39
Deliverables - Accompanied by ASHA to CAC centers for MTP
by trained doctor through MVA/EVA
Incentive for accompanying for MTP through medical method RCH MHPer ASHA for 2
visits300 0.00 156 0.47
Deliverables - Accompanied by ASHA two times i.e. Day-1 & 3
for MTP by MMA
Incentive for distribution of Misoprostol to home delivery
casesRCH MH
Per Home
Delivery100 0.00 1045 1.05
Total blocks covered under the programme - 118 (in 13
districts)
Expected home delivery cases in the targeted blocks - 32237
Targeted coverage - 50% i.e. 16118
Incentive to ASHA for HBYC RCH CH lumpsum - - Approval Pended
ASHA incentive for mobilising 0-3yr children to AWC during
MHT visit RCH RBSK Per visit 50 0.00 2093 1.05
1.ASHA incentive for mobilising 0-3yr children to AWC during
MHT visit to address issues of low coverage.
3.1.1.2 Incentive for FP Services 11.93
3.1.1.2.1 A.3.7.1 ASHA Incentives under Saas Bahu Sammellan RCH FP/NHSRC-CP 0.00 0.00 Not applicable
3.1.1.1.12
3.1.1.1.11 C.5
Page 18 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
3.1.1.2.2 A.3.7.2 ASHA Incentives under Nayi Pehl Kit RCH FP/NHSRC-CP 0.00 0.00 Not applicable
3.1.1.2.3ASHA incentive for updation of EC survey before each MPV
campaignRCH FP/NHSRC-CP 0.00 0.00 Not applicable
3.1.1.2.4 B1.1.3.3.1ASHA PPIUCD incentive for accompanying the client for
PPIUCD insertion (@ Rs. 150/ASHA/insertion)RCH FP/NHSRC-CP Per ASHA 150 0.00 2911 4.37
3.1.1.2.5 B1.1.3.3.2ASHA PAIUCD incentive for accompanying the client for
PAIUCD insertion (@ Rs. 150/ASHA/insertion)RCH FP/NHSRC-CP Per ASHA 150 0.00 210 0.32
3.1.1.2.6 B1.1.3.3.3ASHA incentive under ESB scheme for promoting spacing of
birthsRCH FP/NHSRC-CP Per ASHA 500 0.01 826 4.13
3.1.1.2.7 B1.1.3.3.4ASHA Incentive under ESB scheme for promoting adoption of
limiting method upto two childrenRCH FP/NHSRC-CP Per ASHA 1000 0.01 312 3.12
3.1.1.2.8 Any other ASHA incentives (please specify) NHSRC-CP 0.00 0.00
3.1.1.3 Incentive for AH/ RKSK Services 0.00
3.1.1.3.1 B.1.1.3.4.1 Incentive for support to Peer Educator RCH AH/NHSRC-CP 0.00 0.00
3.1.1.3.2 B.1.1.3.4.2 Incentive for mobilizing adolescents and community for AHD RCH AH/NHSRC-CP Per AHD 150 0.00 0 0.00
3.1.1.3.3 B.1.1.3.4.3 Any other ASHA incentives (please specify) RCH AH/NHSRC-CP 0.00 0.00
3.1.1.4 Incentive for DCPs 44.29
ASHA Incentive/ Honorarium for Malaria CDNVBDCP/NHSR
C-CP43.53
ASHA Incentive for fever testing CDNVBDCP/NHSRC-
CPPer Test 15 0.00 277740 27.58
1 Each ASHA will get Rs.15/- per test(15 Tests Capping).
Budget Proposed for diagnosis @ Rs 15/test for total ASHA of
the districts for 12 months.
ASHA Incentive for treatment CDNVBDCP/NHSRC-
CPPer case 75 0.00 32127 15.95
Each positive case treated by the ASHA will be given Rs 75.
Budget proposed for treatment @ Rs 75/case for an expected
10% reduction of cases over the malaria cases reported in
2017.
3.1.1.4.2 F.1.2.i ASHA Incentive for Dengue and Chikungunya CDNVBDCP/NHSRC-
CP0 0 0.00 0 0.00
Not required as the tests and treatment are done at Sentinel
site Labs by ELISA method. Hence not proposed.
3.1.1.4.3 F.1.3.k ASHA Incentivization for sensitizing community for AES/JE CDNVBDCP/NHSRC-
CP
Per ASHA for 3
months450 0.00 0 0.00
AES/JE cases are newly reported during past few years. ASHA
have been oriented on signs and symptoms of suspected
AES/JE cases. Community sensitization can be made through
ASHA. For ASHA, Incentive for sensitizing community(Rs
150/meeting per ASHA for 3 months)
3.1.1.4.4 F.1.3.mASHA incentive for referral of AES/JE cases to the nearest
CHC/DH/Medical CollegeCD
NVBDCP/NHSRC-
CPPer Patient 100 0.00 0 0.00
Early case management is important for AES/JE cases. It is
proposed to give incentive to ASHA for right and early referral
of cases. ASHA incentive for referral of AES/JE cases to the
nearest CHC/DH/Medical College is proposed for the ASHA of
AES/JE vulnerable 14 districts. (@Rs 100/patient for an
average of 5 patients per month for 3 months in a season)
Total: (Rs.100 * 660 ASHAs * 3 months * 5 patients maximum
= Rs. 9.90 Lakhs)
Budgeted: 30%
3.1.1.4.1 F.1.1.b
Page 19 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Honorarium for Drug Distribution including ASHAs and
supervisors involved in MDACD
NVBDCP/NHSR
C-CP0.00
Honorarium to Drug Administrator for Administration of
DrugsCD
NVBDCP/NHSRC-
CPPer DA 300 0.00 0 0.00
1. Honorarium to Drug Administrator (DA) for Administration
of Drugs. Budget Proposed for the DA for distribution of drugs
for 3days @ 300/- per DA & Hon. For Focal MDA kept at state
level. Total: 25450 DAs x Rs.300/-= Rs. 76.35 Lakhs (Ongoing
activity with revised unit nos)
Budgeted: 62 %
Honorarium to Supervisior CDNVBDCP/NHSRC-
CP
Per
Supervisior150 0.00 0 0.00
2. Hon.to super visor. Budget proposed for Hon. to supervisor
@150/-per supervisor & Hon.
3.1.1.4.6 F.1.4.iASHA incentive for one time line listing of Lymphoedema and
Hydrocele cases in non-endemic distCD
NVBDCP/NHSRC-
CP0 0.00 0 0.00
Not proposed as the activity is already done in non-endemic
districts in 2016.
3.1.1.4.7 G.1.3.a ASHA Involvement under NLEP - Sensitisation 0.76
3.1.1.4.7.a G.1.3.b.i ASHA incentive for detection of leprosy CD NLEP/NHSRC-CP Per Case 250 0.00 100 0.25
3.1.1.4.7.b G.1.3.b.ii ASHA Incentive for PB (Treatment completion) CD NLEP/NHSRC-CP Per Case 400 0.00 44 0.18
3.1.1.4.7.c G.1.3.b.iii ASHA Incentive for MB (Treatment completion) CD NLEP/NHSRC-CP Per Case 600 0.01 56 0.34
3.1.1.4.8 Any other ASHA incentives (please specify) NHSRC-CP 0.00 0.00
3.1.1.5 Incentive for NCDs 4.92
3.1.1.5.1 D.5 ASHA Incentive under NIDDCP RCHNIDDCP/NHSRC-
CP
For testing of
every 50
samples
25 0.00 18516 3.92
Targeted Districts
(I.e. Angul, Bargarh, Cuttack, Dhenkanal, Gajapati, Ganjam,
Kandhmal, Keonjhar, Khurda, Koraput, Malkangiri,
Nabrangpur, Nuapada, Puri, Rayagada, Sambalpur &
Sundargarh)
Total ASHAs in targeted districts - 28794
ASHA incentive as per programme norms is Rs. 25/- per
month (@ Rs.0.50 for one salt sample test, at least 50
samples are to be tested in a month).
The result of salt sample test will be shared with ADMO PH, if
any negative result is found then ADMO PH will instruct the
FSO to draw the sample from the source & send the sample
to SPHL for further testing.
3.1.1.4.5 F.1.4.e
Page 20 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
3.1.1.5.2 Any other ASHA incentives (please specify) NHSRC-CP Per district 100000 1.00 1 1.00
ASHA Incentive: WHO reports that 4% of any given population
suffers from Mental illness out of which 1% suffer from
severe mental illness. Timely detection could prevent mental
illness and promote well being of a person which is also a
mandate of SDG 2030. We aim for early case detection,
timely referral and follow up of Persons with Mental Illness
(PWMI) by ASHA from village level to District Mental Health
units functional across 23 districts. This will reduce the
morbidity and save DALYS in the community. In this context,
more than 10,000 ASHAs have been trained and we intend to
train another 6-8 thousand ASHAs for service delivery.
Incentivisation @ Rs.100/- per new diagnosed case and
Rs50/- for Follow up patient care (old & diagnosed) for five
such visits of PWMI in a year would help us in screening out
the cases and providing them with care and help at grassroot
level.
Incentive Amount:
For new case (Identication & 5 times followup) - Rs.300/-
For old case (5 times followup)- Rs. 250/-
3.1.1.6 Other Incentives 90.29
ASHA incentives for routine activities HSS NHSRC-CP 63.26
Programme : Assured activities for getting an assured
minimum incentive of Rs.1000/- p.m.
The following incentives are under this head.
Other incentives under assured activities are proposed in
respetive heads i.e.
- Mobilization of beneficiaries to VHND
- Organising GKS meeting
- Mobilize children for immunization
- Activities under vector born disease control
Attending monthly sector meeting HSS NHSRC-CP Per ASHA 150 0.00 18516 27.77
Sector meetings are conducted during last week of every
month to review performance of each ASHA & handholding
support for their capacity buidling, ensuring compilation of
reports etc. by designated CP nodal persons.
Proposal is for all ASHAs in the State @Rs.150/- for attending
sector meeting in their respective sectors.
Deliverable - Attend monthly sector meeting at designated
day and place
3.1.1.6.1 B1.1.3.6.1
Page 21 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Support ANM in updating RCH register, marinating due list
for different beneficiary and EC RegisterHSS NHSRC-CP Per ASHA 100 0.00 1543 1.54
ASHAs are facilitating in ensuring records & providing data as
required for RCH updation on regular basis.
Deliverable - Provide data and assist ANM to update RCH
Register.
As it is a demand driven activity all expenditure incurred
under this head has to be booked under the same head
Issuance of birth and death certificate HSS NHSRC-CP Per ASHA 100 0.00 1543 1.54
Deliverable :
For institutional delivery, folow up with public health facility
for issuance of birth certificate.
For home delivery ensure registration of new born & help
ANM filling up registration form.
For death at community level, inform to concern ANM
As it is a demand driven activity all expenditure incurred
under this head has to be booked under the same head
Incentive for regular reporting of Diseases and outbreak
situation in her villageHSS NHSRC-CP Per ASHA p.a 900 0.01 1543 13.89
Deliverable :
Line listing of all disease & conditions & reporting to ANM.
Plan : State has initiated mobile based reporting system by
ASHA which is bening piloted in two of the districts in State.
The system will be up scaled to all the districts in 2018-19.
FGD at village level targeting Adolescent girls & Eligible
couplesHSS NHSRC-CP Per ASHA p.a 1200 0.01 1543 18.52
Deliverable :
Conduct at least one FGD with expetant/pregnant & lactating
mothers on breast feeding & nutration councelling,
adoloscent girls on ARSH.
Any other ASHA incentives (please specify) HSS HSS 27.02
ASHA incentive for additional data collection drive under
National Health Protection MissionHSS HSS Per family 5 0.00005 144498 7.22
As per the DO No. 7(30)/ 2018-NHM-1 dated 16-4-2018 from
AS&MD, GoI, ASHA may be given incentive for data collection
and validation of additional information @ Rs. 5.00 per
completed family updation under NHPS.
Total family selected for NHPS: 6100086
Budget proposed as per GoI
ASHA Incentives under PHC level H&WC (Rural) HSS HSS Per H&WC 60000 0.60000 33 19.80@ Rs. 1000/- PM per ASHA for additional packages (linked
with activities) at collocated SHC
3.1.2 B1.1.1 Selection & Training of ASHA HSS NHSRC-CP 38.78
3.1.2.1 B1.1.1.1 Induction training HSS NHSRC-CP Per ASHA 3800 0.04 14 0.53
Module VI & VII HSS NHSRC-CP 8.89
5 days residential field training of newly ASHAs (round 3 & 4) HSS NHSRC-CP Per Batch 74102 0.74 2 1.48 Training planned for the newly selected ASHAs
5 days residential field training of additional ASHAs (4 rounds) HSS NHSRC-CP Per Batch 74102 0.74 10 7.41 Training planned for new ASHAs to be selected against
vacancy after delinking of ASHA & ASHA SATHIs
Supplementary training for ASHAs HSS NHSRC-CP 24.59
3.1.1.6.1 B1.1.3.6.1
3.1.1.6.2
3.1.2.2 B1.1.1.2
3.1.2.3 B1.1.1.3Page 22 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
District level TOT on refrersher training of ASHAs (continuous
capacity building programme) - 3 days residentialHSS NHSRC-CP Per Batch 72000 0.72 2 1.44
Refresher training of ASHAs at sector level forum (5 days non-
residential)HSS NHSRC-CP Per ASHA 1500 0.02 1543 23.15
Certification of ASHA by NIOS HSS NHSRC-CP 0.00
Refresher training of ASHAs on certification Process (2
rounds, each round is of 5 days residential)HSS NHSRC-CP Per Batch 74102 0.74 0 -
To cover six districts like Boudh, Bolangir, Kalahandi,
Sambalpur, Sonepur & Sundargarh
External Evaluation of ASHAs by NIOS for certification
(incuding practical skills examination and theory examination)
2 days residential
HSS NHSRC-CP Per Batch 33000 0.33 0 -
3.1.2.5 A.3.2.6
Orientation/review of ASHAs (as applicable) for New
Contraceptives, Post partum and post abortion Family
Planning, Scheme for home delivery of contraceptives (HDC),
Ensuring spacing at birth (ESB {wherever applicable}),
Pregnancy Testing Kits (PTK)
RCH FP/NHSRC-CP Per ASHA 200 0.00 1543 3.09
One day orientation of ASHAs on newer contraceptives at
sector level (Both rural & urban ASHAs). Existing trained
resource pool available at district/block level will train ASHA
at sector level
3.1.2.6 A.9.12.5 Training/Refresher training -ASHA (one day) (RBSK trainings) RCH NHSRC-CP 0.00 0.00
Training of ASHA facilitator HSS NHSRC-CP 1.68
State TOT on refrersher training of ASHA SATHIs - 3 days
residentialHSS NHSRC-CP Per Batch 157000 1.57 0 -
Refresher training of ASHA SATHIs at district level - 3 days
residentialHSS NHSRC-CP Per Batch 56000 0.56 3 1.68
3.1.2.8 Any other (please specify) HSS NHSRC-CP 0.00 0.00
3.1.3 Miscellaneous ASHA Costs 76.23
Supervision costs by ASHA facilitators(12 months) HSS NHSRC-CP 40.50
Supervision cost by ASHA SATHIs (3 months) HSS NHSRC-CPPer ASHA
SATHI 9000 0.09 75 6.75 Budgeted for 3 months @ Rs. 3000/-.
Supervision cost by ASHA SATHIs (9 months) HSS NHSRC-CPPer ASHA
SATHI 45000 0.45 75 33.75
Budgeted for 9 months @ Rs.5000/- after delinking of ASHA &
ASHA SATHI.
3.1.3.2 B1.1.3.7 Support provisions to ASHA (Uniform) HSS NHSRC-CP Per ASHA 700 0.01 1543 10.80
Awards to ASHA's/Link workers HSS NHSRC-CP 0.70
Felicitation to best performing ASHAs with Award HSS NHSRC-CP Per dist. 10000 0.10 1 0.10
Felicitation to best performing ASHAs with Award at district
level ASHA ConventionHSS NHSRC-CP Per block. 5000 0.05 12 0.60
State level workshop on Experience sharing, sharing of best
practices & felicitation of best performing ASHAs & GKSsHSS NHSRC-CP lumpsum 500000 5.00 0 -
3.1.3.4 C.1.g Mobilization of children through ASHA or other mobilizers RCH RI/NHSRC-CP per session 150 0.00 12296 18.44 Provision for rural & Urban ASHA
Any other (please specify) 5.79
Recurring expenses of ASHA Gruha Per Gruha 90000 0.90 5 4.50
Identity card @ Rs. 50/- for newly selected ASHAs Per ASHA 50 0.00 14 0.01
ASHA Corpus Fund (Compensation for death and disability) Lumpsum 1000000 10.00 0 -
3.1.2.3 B1.1.1.3
3.1.2.4 B1.2
3.1.2.7 B1.1.1.5.1
3.1.3.1 B1.1.1.4.1
3.1.3.3 B1.1.4
3.1.3.5Page 23 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Bi-annual re-orientation cum review of designated CP nodal
persons on strengthening CP activitiesPer person 600 0.01 47 0.28 Budgeted for 2 meetings during a year
Enrollment of ASHAs in education empowerment programme
(below 10th) Per ASHA 2500 0.03 0 -
ASHAs of 10 districts like Angul, Baragarh, Deogarh,
Dhenkanal, Jharsuguda, Keonjhar, Mayurbhanj, Sambalpur,
Sonepur & Sundargarh covered in this phase
Felicitate ASHAs as part of exit after 60 years of age Per ASHA 20000 0.20 5 1.00
ASHAs who attains the age of 60 will be felicitated with a cash
benefit of Rs. 20,000/- as part of her exit from the position of
ASHA from the village
3.2 Other Community Interventions 30.89
3.2.1 A.3.7.5
Other activities under Mission Parivar Vikas : Demand
Generation (Saarthi, Saas Bahu Sammellan, Creating enabling
environment)
RCH FP 0.00 0.00 Not applicable
3.2.2 A.4.2.1 Incentives for Peer Educators RCH AH Per PE 600 0.01 0 0.00
Non financial incentives of PEs in two Districts. Budget
proposed as per last year's approval @Rs.50/- per PE p.m for
12 months
Honorarium/Counselling Charges for RNTCP DCP RNTCP Lumpsum 27.89
Honorarium for DOT providers for Cat I patients DCP RNTCP Per Patient 1000 0.01 2136 21.36
Honorarium for DOT providers for Cat II patients
(RETREATMENT)DCP RNTCP Per Patient 1500 0.02 337 5.06
Honorarium for DOT providers of Cat IV / V patients –
Intensive phaseDCP RNTCP Per Patient 2000 0.02 13 0.26
Honorarium for DOT providers of Cat IV / V patients –
Continuation phaseDCP RNTCP Per Patient 3000 0.03 8 0.24
Injection prick charges to non-salaried person during TB
treatmentDCP RNTCP Per Prick 25 0.00 249 0.06
Provider's Incentives for notification of TB patients and
reporting treatment outcome to private practioners (PP),
pharmcies, patients & any other informers
DCP RNTCP Per Patient 1000 0.01 91 0.91
Provider's Incentives for notification of TB patients and
reporting treatment outcome to private practioners (PP),
pharmcies, patients & any other informers@ Rs. 1000/- per
patient from pvt. sector
Referral for presumptive TB and Notification of newly
diagnosed TB patientsDCP RNTCP
Per diagnosed
case 1000 0.01 0.00 Budget Not Approved
3.2.4 B15.1Community Action for Health (Visioning workshops at state,
dist., block level, Training of VHSNC, Training of RKS)0.00
Community action for health is being implemented in 56
selected blocks under 15 IMR/MMR districts out of which
provision of budget for 6 blocks proposed in NHM & rest 50
blocks under State budget.
3.2.4.1 B15.1.1 State level HSS HSS Lumpsum 98000 0.98 0 0.00
District level HSS HSS 0.00
One day refresher workshop for BNVs/other volunteers HSS HSS Per Participant 750 0.01 0 0.00
3.1.3.5
3.2.3 H.3
3.2.4.2 B15.1.2
Page 24 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Quarterly Performance monitoring of BNVs/other volunteers
along with BPMsHSS HSS Per District 24000 0.24 0 0.00
Quarterly Performance monitoring/ Review meeting of
BNVs/other volunteers along with BPMs @Rs.24000/- per
district for selected 3 districts for 3 qtrs
Printing of Suchana Patrikas & other documents HSS HSS Per District 20000 0.20 0 0.00
Block level HSS HSS 0.00
Quarterly Facilitation cost to BNVs/other volunteers at GKS
level HSS HSS Per GKS 2000 0.02 0 0.00
Quarterly Facilitation cost to BNVs/other volunteers at GKS
level @Rs.500/- per GKS per qtr
Quarterly Facilitation cost to BNVs/other volunteers at GP
levelHSS HSS Per GP 2000 0.02 0 0.00
Quarterly Facilitation cost to BNVs/other volunteers at GP
level @Rs.500/- per GP per qtr
Quarterly Block Health Mission meeting HSS HSS Per Block 8000 0.08 0 0.00Quarterly Block Health Mission meeting @Rs.2000/- per
meeting per qtr
Block level Jan Sambad/Jan Sunwai HSS HSS Per Block 10000 0.10 0 0.00
3.2.4.4 B15.1.4.1 Constitution / Reconstitution of VHSNC HSS HSS 0.00 0.00
3.2.4.5 Any other (please specify) 0.00 0.00
3.2.5 Preventive Strategies 3.00
3.2.5.1 F.1.1.c Preventive strategies for Malaria 0.00
3.2.5.1.1 F.1.1.c.i Operational cost for Spray Wages CD NVBDCP 0.00 0.00
3.2.5.1.2 F.1.1.c.ii Operational cost for IRS CD NVBDCP 0.00 0.00
3.2.5.1.3 F.1.1.c.iii Operational cost for Impregnation of Bed nets- for NE states CD NVBDCP 0.00 0.00
3.2.5.1.4 F.1.1.h Biological and Environmental Management through VHSC CD NVBDCP 0.00 0.00
3.2.5.1.5 F.1.1.i Larvivorous Fish support CD NVBDCP 0.00 0.00
3.2.5.2 F.1.1.c Preventive strategies for vector born diseases 0.00
3.2.5.2.1 F.1.2.fDengue & Chikungunya: Vector Control, environmental
management & fogging machineCD NVBDCP 0.00 0.00 No
3.2.5.2.2 F.1.3.gAcute Encephalitis Syndrome (AES)/ Japanese Encephalitis
(JE): Operational costs for malathion foggingCD NVBDCP 0.00 0.00
3.2.5.2.3 F.1.5.b Kala-azar: Operational cost for spray including spray wages CD NVBDCP 0.00 0.00
3.2.5.2.4 F.1.5.e Kala-azar: Training for spraying CD NVBDCP 0.00 0.00
3.2.5.3 J.1.3District counselling centre (DCC) and crisis helpline
outsourced to psychology department/ NGO per yearNCD NMHP Per District 300000 3.00 1 3.00 Rs. 3.00 lakhs Per District proposed as approved last year
3.2.5.4 Any other (please specify) 0.00 0.00
3.3 B8 Panchayati Raj Institutions (PRIs) 53.55
Orientation of Community leader & of VHSC,SHC,PHC,CHC
etc.HSS HSS 47.73
1.Capacity building of GKS members under VISHWAS
Two days intensive Capacity building Training of GKS office
bearers & other three active members of GKS on VISHWAS
module.
As Per the Govt. of India communication, all GKS will be
covered in phased manner. In the current year about 50%
GKS of all 13 HPDs will be covered as part of VISHWAS
Capacity building training programme.
3.2.4.2 B15.1.2
3.2.4.3 B15.1.3
3.3.1 B8.1
Page 25 of 280
Kandhamal_Community Interv.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
State ToT HSS HSS 30/Per batch 48000 0.48 0 0.00
District ToT HSS HSS 30/Per batch 48000 0.48 1 0.48
Field Training HSS HSS 30/Per batch 21000 0.21 225 47.25
Strengthening Supportive Supervision of GKS (VHSNC)
activites at the field levelHSS HSS 40/Per batch 0.00 0.00 Approval pended
3.3.2 B8.2Orientation Workshops, Trainings and capacity building of PRI
for RKS at District Health Societies, CHC and PHC HSS HSS 0.00 0.00
3.3.3 PRI Sensitization/Trainings 0.00
3.3.3.1 E.2.9 One day sensitization for PRIs CD IDSP 0.00 0.00Integrated with VHSNC meeting. No additional cost proposed.
Not proposed in PIP 2018-19.
3.3.3.2 M.1.1.4Training of PRI's representatives/ Police personnel/ Teachers/
Transport personnel/ NGO personnel/ other stakeholdersCD NTCP 0.00 0.00
Balance fund under this component in PIP 2017-18 to be
utilised in the current year
Any other (please specify) HSS HSS 5.82
Quarterly Block level convergence meeting
(Health, ICDS, PR & RWSS) HSS HSS Per meeting 500 0.01 48 0.24
Forum for review & progess of GKS acivity implementation
and better inter-sectoral converegence with other line
department.
Sector level mini-convention HSS HSSPer
convention2000 0.02 37 0.74
Forum to monitor GKS activities at sub-block level, cross
learning experience & feedback to low performing GKS
Quarterly GP level meeting for Integration of health related
activity with PR system. HSS HSS Per meeting 500 0.01 376 1.88 Inregration of Health related activity with PR system.
Block level Convention HSS HSSPer
Convention10000 0.10 12 1.20
Forum for experience sharing & develop better inter-sectoral
convergence with line Departments-
Award to Sustha Panchayat Puraskar HSS HSS Per GP 11250 0.11 5 0.56
Award to Sustha Gaon HSS HSS Per block 10000 0.10 12 1.20
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 IDSP
5 NLEP
6 RNTCP
7 NVBDCP
8 NTCP
9 NMHP
3.3.4
3.3.1 B8.1
Page 26 of 280
Kandhamal_Untied Fund
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
4 Untied Fund 330.10
4.1 B2Untied Funds/Annual Maintenance Grants /Corpus Grants
to HMS/RKS330.10 Allocation of fund based on last year's utilisation
4.1.1 B2.1 District Hospitals HSS HSS Per inst. 1000000 10.00 1 9.89
4.1.2 B2.2 SDH HSS HSS Per inst. 500000 5.00 1 5.00
4.1.3 B2.3 CHCs HSS HSS Per inst. 500000 5.00 14 62.96
4.1.4 B2.4 PHCs HSS HSS Per inst. 75000 0.75 36 21.02
4.1.5 B2.5 Sub Centres HSS HSS Per inst. 20000 0.20 172 22.13
4.1.6 B2.6 VHSC HSS HSS Per GKS 10000 0.10 2253 206.35
4.1.7 B2.7 Others (please specify) HSS HSS Per inst. 75000 0.75 4 2.75
SL No Component Colour code
2 HSS
Annexure for Untied Fund
Page 27 of 280
Kandhamal_Infrastructure
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5 Infrastructure 570.26
5.1 Upgradation of existing facilities 460.00
5.1.1 B.4.1Upgradation of CHCs, PHCs, Dist. Hospitals and other
Institutions 460.00
5.1.1.1
B4.1.1/ B4.1.2/
B4.1.3/ B4.1.4/
B4.1.5/ B4.1.6/
B5.6/
A.9.10/B.5.10
Additional Building/ Major Upgradation of existing Structure 81.00
District Hospitals (As per the DH Strengthening Guidelines) HSS HSS 0.00
New construction of Attendant Rest Shed (DHH) HSS HSS Per unit 2800000 28.00 0 0.00
New construction of Ward (DHH) HSS HSS Lumpsum 0 0.00 1 0.00
SDH HSS HSS 0.00
New construction of Attendant Rest Shed (SDH) HSS HSS Per unit 2800000 28.00 0 0.00
New construction of Ward (SDH) HSS HSS Per unit 4800000 48.00 0 0.00
New construction of OPD Building (SDH) HSS HSS Per unit 10000000 100.00 0 0.00
CHCs HSS HSS 80.00
Construction of New Operation Theatre (CHC) HSS HSS Per unit 4000000 40.00 0 0.00
New construction of Labour Room (CHC) HSS HSS Per unit 3800000 38.00 0 0.00
New construction of Attendant Rest Shed (CHC) HSS HSS Per unit 2800000 28.00 0 0.00
New construction of Ward (CHC) HSS HSS Per unit 4800000 48.00 0 0.00
New construction of OPD (CHC) HSS HSS Per unit 8000000 80.00 1 80.00
PHCs HSS HSS 0.00
New construction of Labour Room (PHC-N) HSS HSS Per unit 2600000 26.00 0 0.00
5.1.1.1.e B4.1.4.1 Sub Centres HSS HSS 0.00 0.00
5.1.1.1.f B4.1.5.2 MCH Wings HSS MH/ HSS 0.00 0.00
Facility based newborn care centres
(SNCU/NBSU/NBCC/KMC unit)HSS CH/HSS 1.00
Up gradation/ Renovation work at (SNCU) HSS CH/HSS Per unit 3000000 30.00 0 0.00
Plan is to establish 4 SNCUs & expansion of 2 SNCUs from 12
bed to 24 bed in 2018-19.
Details in Infrastructure Annexure - Refer Infrastructure DPR
for details
Up gradation/ Renovation work at (KMC Units) HSS CH/HSS Per unit 100000 1.00 1 1.00
Plan is to establish 11 KMC units in 2018-19.
Details in Infrastructure Annexure - Refer Infrastructure DPR
for details.
Compresensive Lactation Management Unit HSS CH/HSS Per unit 1000000 10.00 0 0.00Comprehensive Lactation Management Unit at SCB MCH
Cuttack & Capital Hospital BBSR:
5.1.1.1.h I.2.7Grant-in-aid for construction of Eye Wards and Eye OTS
(renamed as dedicated eye unit)NCD NPCB Per Eye Ward 0.00 0.00
5.1.1.1.i B.5.10.1.1 Training Institutions HSS HSS 0.00 0.00
5.1.1.1.j Others HSS HSS 0.00 0.00
5.1.1.1.g B.5.6.3
5.1.1.1.c B4.1.2.1 Details in Infrastructure Annexure - Refer Infrastructure DPR
for details.
5.1.1.1.d B4.1.3.1Details in Infrastructure Annexure - Refer Infrastructure DPR
for details.
Annexure for Infrastructure Strengthening
5.1.1.1.a B4.1.1.1Details in Infrastructure Annexure - Refer Infrastructure DPR
for details.
5.1.1.1.b B4.1.6.1Details in Infrastructure Annexure - Refer Infrastructure DPR
for details.
Page 28 of 280
Kandhamal_Infrastructure
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5.1.1.2
B4.1.1/ B4.1.2/
B4.1.3/ B4.1.4/
B4.1.6/ B.5.10
Upgradation/ Renovation 254.00
5.1.1.2.a B4.1.1.2 District Hospitals (As per the DH Strengthening Guidelines) HSS HSS 0.00 0.00
5.1.1.2.b B.26.1.1 Renovation, Dental Chair, Equipment - District Hospitals HSS NOHP 0.00 0.00To be met out of comprehensive equipment maintenance
programme proposed under HSS.
5.1.1.2.c B.27.1.4Renovation of PC unit/OPD/Beds/Miscellaneous equipment
etc.HSS NPPC 0.00 0.00
5.1.1.2.d B4.1.6.2 SDH HSS HSS 0.00 0.00
5.1.1.2.e B4.1.2.2 CHCs HSS HSS Per Unit 2500000 25.00 1 25.00Up gradation/ Renovation work at CHC
Details in Infrastructure Annexure
5.1.1.2.f B4.1.3.2 PHCs HSS HSS Lumpsum 7200000 72.00 1 72.00Up gradation/ Renovation work at PHC
Details in Infrastructure Annexure
5.1.1.2.g B4.1.4.2 Sub Centres HSS HSS Per SC 400000 4.00 0 0.00Up gradation/ Renovation work at SC
Details in Infrastructure Annexure
5.1.1.2.h B18.3 Infrastructure strengthening of SC to H&WC HSS HSS Per H&WC 400000 4.00 33 132.00For PHC Level H&WC (Rural)
Details in Annexure
5.1.1.2.i B.5.10.1.2 Training Institutions HSS HSS Lumpsum 1000000 10.00 0 0.00 1. Conference Hall at Mission Directorate- Rs.10.00 Laths
5.1.1.2.j Drug Warehouses HSS HSS Per Unit 2500000 25.00 1 25.00Spill over of Ongoing works - of DWH
Details in Infrastructure Annexure
5.1.1.2.kUpgradation/ Renovation of Obstetric ICUs/ HDUs (as per
operational guidelines of ICUs and HDUs, 2017)HSS MH/ HSS 0.00 0.00
ICU-No new plan for establishment of ICUs in 2018-19.
HDU & PICU- The required fund will be managed out of State
Budget.
5.1.1.2.l Others HSS HSS Lumpsum 1000000 10.00 0 0.00
Up gradation of Preview Theatre
Materials - A specific room with sound observer ( Existing
room at SIHFW to be upgraded ), One LED TV, One Home
Theatre, One recording system
5.1.1.3
B4.1.1/ B4.1.2/
B4.1.3/ B4.1.4/
B4.1.5/ B4.1.6/
B.5.10
Spill over of Ongoing Works 125.00
5.1.1.3.a B4.1.1.3 District Hospitals (As per the DH Strengthening Guidelines) HSS HSS 0.00 0.00
5.1.1.3.b B4.1.6.3 SDH HSS HSS Per unit 12500000 125.00 1 125.00Spill over of Ongoing works - of SDH
Details in Infrastructure Annexure
5.1.1.3.c B4.1.2.3 CHCs HSS HSS Per unit 8400000 84.00 0 0.00Spill over work Construction of CHC Building
Details in Infrastructure Annexure
5.1.1.3.d B4.1.3.3 PHCs HSS HSS 0.00 0.00
5.1.1.3.e B4.1.4.3 Sub Centres HSS HSS 0.00 0.00
5.1.1.3.f B4.1.5.3 MCH Wings HSS MH/ HSS Lumpsum 0 0.00 1 0.00Spill over of Ongoing works - of MCH Wings
Details in Infrastructure Annexure
5.1.1.3.gFacility based newborn care centres (SNCU/NBSU/NBCC/KMC
unit)HSS CH/HSS 0.00 0.00
Page 29 of 280
Kandhamal_Infrastructure
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5.1.1.3.i B.5.10.1.3 Training Institutions HSS HSS 0.00 0.00
5.1.1.3.j Others HSS HSS Lumpsum 0 0.00 1 0.00Spillover work of District& Regional Vaccine Store
Details in Infrastructure Annexure
5.1.1.4
B4.1.1/ B4.1.2/
B4.1.3/ B4.1.4/
B4.1.6/ B.5.10
Staff Quarters 0.00
5.1.1.4.a B4.1.1.4 District Hospitals (As per the DH Strengthening Guidelines) HSS HSS 0.00 0.00
5.1.1.4.b B4.1.6.4 SDH HSS HSS 0.00 0.00
5.1.1.4.c B4.1.2.4 CHCs HSS HSS 0.00 0.00
5.1.1.4.d B4.1.3.4 PHCs HSS HSS 0.00 0.00
5.1.1.4.e B4.1.4.4 Sub Centres HSS HSS 0.00 0.00
5.1.1.4.f B.5.10.1.4 Training Institutions (incl. hostels/residential facilities) HSS HSS 0.00 0.00
5.1.1.4.g Others HSS HSS 0.00 0.00
5.1.2 B.4.3 Sub Centre Rent and Contingencies HSS HSS 0.00 0.00
5.2 New Constructions 15.00
5.2.1
B5.1/ B5.2/ B5.3/
B5.5/ B5.10/
A.9.10.2/ B.5.11/
B.5.12/B.5.13/
B4.1.5/ A.4.1.2/
A.2.5
New construction (to be initiated this year) 15.00
5.2.1.1 B5.12.1 DH HSS HSS 0.00 0.00
5.2.1.2 B5.11.1 SDH HSS HSS Per unit 12500000 125.00 0 0.00
New construction New Hospital Building (OPD IPD Complex)
at SDH
Details in Infrastructure Annexure
5.2.1.3 B5.1.1 CHCs HSS HSS Per unit 6900000 69.00 0 0.00
New construction New Hospital Building (OPD IPD Complex)
at CHC
Details in Infrastructure Annexure
5.2.1.4 B5.2.1 PHCs HSS HSS 0.00 0.00
5.2.1.5 B5.3.1 SHCs/Sub Centres HSS HSS Per unit 2750000 27.50 0 0.00
New construction (SCs)
Details in Infrastructure Annexure- Refer Infrastructure DPR
for details.
5.2.1.6 B4.1.5.1 MCH Wings HSS MH/ HSS Lumpsum 0 0.00 1 0.00
New MCH wings (to be initiated this year)
Details in Infrastructure Annexure (Budget revised as per
State's need)
5.2.1.7 B.5.6.1Facility based newborn care centres (SNCU/NBSU/NBCC/KMC
unit)HSS CH/HSS 0.00 0.00
5.2.1.8 B5.13.1 DEIC (RBSK) HSS RBSK 0.00 0.00
Page 30 of 280
Kandhamal_Infrastructure
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5.2.1.9 A.4.1.2 AFHCs at Medical college/ DH/CHC/PHC level RCH AH Per AFHC 50000 0.50 0 0.00
Proposal:
1. Approved for 2 new AFHCs at CHC in RKSK Districts @Rs.
50000 per AFHCs per year.
2. For existing 55 FRU level AFHCs , budget Shifted to FMR
No.1.3.1.6 as per recommendation of NPCC
5.2.1.10 A.2.5 Establishment of NRCs RCH CH 0.00 0.00
5.2.1.11 Drug Warehouses HSS HSS Per SDH 1500000 15.00 1 15.00
Saturated at all DHH, SDH & CHC level except 13 SDHs.
Proposal 2018-19 : Establishment of Drug Ware house at SDH
level @Rs.15.00 laths (Plinth area - 1000sqft.) - Refer
Infrastructure DPR for details.
5.2.1.12 B5.5 Govt. Dispensaries/ others HSS HSS 0.00 0.00
5.2.1.13 B5.10.2/ B5.10.3 Training Institutions HSS HSS 0.00 0.00
5.2.1.14 Others 0.00 0.00
5.2.2
B5.1/ B5.2/ B5.3/
B5.6/ B5.5/
B5.10/ B.5.11/
B.5.12/ B.5.13
Carry forward of new construction initiated last year, or the
year before0.00
5.2.2.1 B.5.12.2 DH HSS HSS 0.00 0.00
5.2.2.2 B.5.11.2 SDH HSS HSS 0.00 0.00
5.2.2.3 B5.1.2 CHCs HSS HSS 0.00 0.00
5.2.2.4 B5.2.2 PHCs HSS HSS 0.00 0.00
5.2.2.5 B5.3.2 SHCs/Sub Centres HSS HSS 0.00 0.00
5.2.2.6 B.5.6.2Facility based newborn care centres (SNCU/NBSU/NBCC/KMC
unit)HSS CH/HSS 0.00 0.00
5.2.2.7 B.5.13.2 DEIC (RBSK) HSS RBSK Lumpsum 0 0.00 1 0.00 Details in Infrastructure Annexure
5.2.2.8 B5.5 Govt. Dispensaries/ others HSS HSS 0.00 0.00
5.2.2.9 B5.10.4 Training Institutions HSS HSS 0.00 0.00
5.2.2.10 Others HSS HSS 0.00 0.00
5.3 Other construction/ Civil works 95.26
5.3.1 B4.1.5.4 Civil Works HSS HSS 0.00 0.00
5.3.2 B1.1.3.7 ASHA Ghar HSS NHSRC - CP Per ASHA ghar 100000 1.00 2 2.00
Civil proposal :
For new - Fund mobilised from State budget for 90 new ASHA
Ghar.
For ongoing - Repair maintenance grant required for
construction of toilet for 84 existing ASHA Ghar @Rs.100000/-
per unit
Page 31 of 280
Kandhamal_Infrastructure
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5.3.3 B4.1.5.4.1Blood bank/ Blood storage/ Day care centre for
hemoglobinopathiesHSS Blood cell/ HSS
Per per blood
bank200000 2.00 1 2.00
1.Blood bank - All blood banks have their own building. 35
blood banks need repair / maintenance grant as per facility
assessment. Proposed @Rs.2.00 lakhs per blood bank.
2.Blood storage unit - All BSUs are operational in existing
building, hence no additional budget submitted.
3.Day care Centre - 3 day care centres have been sanctioned
which are in the process of establishment, hence no additional
budget requested.
5.3.4 B.5.7 Operationalization of FRUS HSS HSS 0.00 0.00
5.3.5 B.5.8 Operationalization of 24 hour services at PHCs HSS HSS 0.00 0.00
5.3.6 B.5.9Operationalising Infection Management & Environment Plan
at health facilitiesHSS HSS 0.00 0.00
5.3.7 Infrastructure for paediatric OPD and ward RCH CH 0.00 0.00
5.3.8 B.28.1Assistance to State for Capacity building (Burns & injury): Civil
WorkHSS Burns & Injury 0.00 0.00
5.3.9 C.1.p Safety Pits RCH RI Per safty pit 6000 0.06 7 0.42Proposed based on facility assessment.
Unit cost revised as per GoI guideline.
5.3.10 D.2 Establishment of IDD Monitoring Lab RCH NIDDCP 0.00 0.00
5.3.11 F.1.1.j Construction and maintenance of Hatcheries DCP NVBDCP 0.00 0.00 Will be met from RKS fund
5.3.12 F.2.1.e Infrastructure (INF) DCP NVBDCP 0.00 0.00
5.3.13 F.1.3.j ICU Establishment in Endemic District DCP NVBDCP 0.00 0.00Has been established with support of State budget, NHM and
under NPCDCS programme
Civil Works under RNTCP DCP RNTCP 0.24
Upgradation of State TB Training and Demonstration Centre
(STDC)DCP RNTCP Lumpsum 200000 2.00 0 0.00
Upgradation Linked DRTB Ward DCP RNTCP Lumpsum 300000 3.00 0 0.00
Linked DRTB ward: Dedicated 2 Nos. of Beds exclusively for
DRTB patients at DHH with Air Born Infection Control
Measures (AIC) nearby TB/ ID Wards.
Upgradation of drug store DCP RNTCP Lumpsum 1500000 15.00 0 0.00 Up gradation of Annex State drug Store at Kalahandi DHH
Maintenance for old TB units DCP RNTCP Per unit 2500 0.03 4 0.10
Maintenance for DMCs with Smear Microscopy (ZN Staining DCP RNTCP Per unit 2000 0.02 5 0.10
Maintenance of DMCs with smear microscopy (Fluorescent
microscopy)DCP RNTCP Per unit 2000 0.02 2 0.04
Maintenance of DR TB Centre DCP RNTCP Per unit 50000 0.50 0 0.00
5.3.15 J.1.1District DMHP Centre, Counselling Centre under psychology
deptt. In a selected college including crisis helplineNCD NMHP 0.00 0.00
Already provisioned in 2017-18
5.3.14 H.1
Page 32 of 280
Kandhamal_Infrastructure
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
5.3.16 K.2.1.1
Non-recurring GIA: Construction/ renovation/ extension of
the existing building and Geriatrics Unit with 10 beds and OPD
facilities at DH
NCD NPHCE Per DHH 4000000 40.00 0 0.00
Total DHH: 32
Fund sanctioned for construction Geriatric ward: 30
Status of construction: 8 completed & rest 22 are under
progress which will be completed by Dec 2018
Proposal 2018-19: Construction of Geriatric ward at 2 DHHs
Total project cost: Rs. 40.00 lakhs x 2 = Rs. 80.00 Lakhs (50 %
of total projected cost proposed)
5.3.17 O1.1.2.1 Cardiac Care Unit (CCU/ ICU) NCD NPCDCS 0.00 0.00
NHM approved-5 (Functional-5; Nupada , Koraput,
Malkangiri, Nabrangpur, Bolangir)
State Budget- 8 (Functional-5; Puri, Balasore, Maurbhanj,
Kalahandi & Capital Hospital) In progress; Angul, Bargarh,
Jajpur
No new proposal for 2018-19, existing ICUs will be
strengthened to function to its full potential.Any other (please specify) 90.60
Post Surgery Crtical Care Unit for new born RCH RBSK Per Unit 1000000 10.00 0 0.00 Renovation of existing unit
Lighting Arrester HSS HSS Per Unit 180000 1.80 17 30.60
Lighting Arrester (Units required for DHH-64 nos for 32 DHHs,
for SDH-27 nos for 27 SDHs & for CHC-377 nos for 377 CHCs )
Total 468 units
24x7 Pipe Water Supply System 50.00 24x7 Pipe Water Supply System
For DHH HSS HSS Per Unit 5000000 50.00 0 0.00
For SDH HSS HSS Lumpsum 0 0.00 1 0.00
For CHC HSS HSS Lumpsum 5000000 50.00 1 50.00
For PHC HSS HSS Lumpsum 0 0.00 1 0.00
For SC HSS HSS Lumpsum 0 0.00 1 0.00
Expansion & upgradation of internal electrification 10.00 Expansion & up gradation of internal electrification
For DHH HSS HSS Lumpsum 0 0.00 1 0.00
For SDH HSS HSS Lumpsum 0 0.00 1 0.00
For CHC HSS HSS Lumpsum 1000000 10.00 1 10.00
For PHC HSS HSS Lumpsum 0 0.00 1 0.00
For SC HSS HSS Lumpsum 0 0.00 1 0.00
SL No Component Colour code1 RCH
2 HSS
3 RI
4 NIDDCP
8 RNTCP
9 NVBDCP
10 NPCB
11 NPHCE
12 NPCDCS
14 NMHP
17 NOHP
18 NPPC
5.3.18
Page 33 of 280
Kandhamal_Procurement
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6 Procurement 233.25
6.1 B.16.1 Procurement of Equipment 25.52
6.1.1 Procurement of Bio-medical Equipment 22.47
6.1.1.1 B16.1.1 Procurement of bio-medical equipment: MH 0.00
6.1.1.1.a B16.1.1.2 MVA /EVA for Safe Abortion services HSS MH Per MVA 3000 0.03 0 0.00Total units approved -500
State to procure & supply as per requirement to the Districts
Procurement under LaQshya HSS MH 0.00 Total units approved -90 Details in Laqshya Annexure
Mannequin Set HSS MH Per inst. 149000 1.49 0 -
Other procurement for LR HSS MH Per inst. - -
Budget dropped
To be met out of state budget
Details in Laqshya Annexure
6.1.1.1.cEquipment for Obstetric ICUs/ HDUs (as per operational
guidelines of ICUs and HDUs, 2017)HSS MH 0.00 0.00 Proposed under SAMPurNA programme
Any other equipment (please specify) HSS MH 0.00 State to procure & Supply
Requirement of Catridge for insuline therapy HSS MH Per Cartidge 300 0.00 0 0.00 3ml cartridge of 100 IU/ml : 7026 Nos approved for the State
Requirement of insulin pen HSS MH Per pen 400 0.00 0 0.00 Requirement of insulin pen: 1171 Nos approved for the State
Requirement of needles HSS MH Per needle 13 0.00 0 0.00 Requirement of needles :210780 Nos approved for the State
6.1.1.2 B16.1.2 Procurement of bio-medical equipment: CH 2.65
6.1.1.2.a B16.1.2.1 Equipment for Paediatric OPD and Ward HSS CH 0.00 0.00Budgeted under state specific initiative for accelerated
reduction of IMR/MMR i.e. SAMMPurNA programme
Any other equipment (please specify) HSS CH 2.65
Equipment for SNCU HSS CH
Approved in 2018-19 :
1. New 12 bedded - 4
A. SDH Anandpur
B. City Hospital Behrampur
C. SDH Udala
D. SDH Patnagarh
2. Expansion of 2 SNCUs (Bhadrak & Rayagada) from 12
bedded to 24 bedded For 12 bedded (New) HSS CH Per SNCU 2500000 25.00 0 -
For 24 bedded (Expansion) HSS CH Per SNCU 2500000 25.00 0 -
For Level-III SNCU HSS CH Per SNCU 2200000 22.00 0 -
Equipment for KMC HSS CH Per KMC 265000 2.65 1 2.65
Equipment for Lactation Management Unit (LMU HSS CH Per unit 960000 9.60 0 - Establishment of Lactation Management Unit (LMU) at MKCG
MCH Berhampur
Equipment for Comprehensive Lactation Management Unit HSS CH Per unit 3287000 32.87 0 - Comprehensive Lactation Management Unit at tertiary
institutions at SCB MCH Cuttack & Capital Hospital BBSR
6.1.1.2.b B16.1.2.2
Annexure for Procurement
6.1.1.1.b
6.1.1.1.d B16.1.1.3
Page 34 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Equipment for NBCC HSS CH Per NBCC 30000 0.30 0 - State to procure & supply
Post Surgery Crtical Care Unit for new born HSS CH Lumpsum 1120000 11.20 0 - Approved for Sishu Bhawan, Ctc.
6.1.1.3 B16.1.3 Procurement of bio-medical equipment: FP 0.10
6.1.1.3.a B16.1.3.1 NSV kits HSS FP Per kit 1000 0.01 0 0.00 For new NSV FDS centres. State to procure & supply
6.1.1.3.b B16.1.3.2 IUCD kits HSS FP Per kit 2000 0.02 0 0.00For new IUCD FDS centres in the State. State to procure &
supply
6.1.1.3.c B16.1.3.3 Minilap kits HSS FP Per kit 3000 0.03 0 0.00 For new minilap FDS centres - State to procure & supply
6.1.1.3.d B16.1.3.4 laparoscopes HSS FP Per kit 900000 9.00 0 0.00 State to procure & supply to the districts as per the intendent
6.1.1.3.e B16.1.3.5 PPIUCD forceps HSS FP Per kit 600 0.01 16 0.10 For new PPIUCD FDS centres . State to procure &supply
6.1.1.3.f B16.1.3.6 Any other equipment (please specify) HSS FP 0.00 0.00
6.1.1.4 B16.1.6 Procurement of bio-medical equipment: AH 0.00
6.1.1.4.a B16.1.6.1 Equipments for AFHCs HSS AH 0.00 0.00
6.1.1.4.b B16.1.6.2 Any other equipment (please specify) HSS AH 0.00 0.00
6.1.1.5 B16.1.6.3 Procurement of bio-medical equipment: RBSK 0.72
6.1.1.5.a B16.1.6.3.1 Equipment for Mobile health teams HSS RBSK Per MHT 3000 0.03 24 0.72Proposal is for replenishment of old & non-functional
equipment instrument as per assessment.
6.1.1.5.b B16.1.6.3.2 Equipment for DEIC HSS RBSK Per DEIC 280000 2.80 0 0.00
Establishment of Sensory Integration (SI) therapy unit at DEIC -
SI unit is planned to be set up in 16 DEICs (50% of DEIC during
the Year.
Equipment required for SI unit are for Vestibular stimulation,
Tactile stimulation, tactile textures and visual stimulation etc.
Unit cost is decided based on market rate.
6.1.1.5.c Any other equipment (please specify) HSS RBSK Per DEIC 0 0.00 0 0.00
6.1.1.6 Procurement of bio-medical equipment: NIDDCP 0.00
6.1.1.6.a Procurement of lab equipment RCH NIDDCP 0.00 0.00
6.1.1.6.b Any other equipment (please specify) RCH NIDDCP 0.00 0.00
6.1.1.7 B16.1.7 Procurement of bio-medical equipment: Training 0.00
6.1.1.7.a B3.3 Equipment for Rollout of B.Sc. (Community Health) HSS NHSRC-CP 0.00 0.00
6.1.1.7.b B16.1.7 Equipments and mannequin HSS Training 0.00 0.00
6.1.1.7.cB16.1.7/
A.9.1.2.2Models and Equipments for DAKSHATA training HSS MH
Per Dakshata
coordinator/
mentor
40000 0.40 0 0.00
No. of HPDs has been increased from 10 to 13 nos.
Dhenkanal district has been included in HPD as per recent
analysis which was not earlier part of it. Other two districts
namely Keonjhar and Deogarh had already been covered
under DAKSHATA activities as a part of State initiative
SAMPurNA programme.
3 nos of mentors will be selected and trained as per the norm
for Dhenkanal district, thus 3 sets of mannequins are
proposed which will be provided to mentors for MSV
6.1.1.2.b B16.1.2.2
Page 35 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.1.1.7.dB16.1.7/
A.9.10.1Equipment for nursing schools/institutions HSS MH 0.00 0.00
6.1.1.7.e Any other equipment (please specify) HSS Training 0.00 0.00
6.1.1.8 B16.1.8 Procurement of bio-medical equipment: AYUSH 0.00
6.1.1.8.a HSS HSS/ AYUSH 0.00 0.00
6.1.1.8.b HSS HSS/ AYUSH 0.00 0.00
6.1.1.9 B16.1.1.1 Procurement of bio-medical equipment: Blood Banks/BSUs 0.00
6.1.1.9.aprocurement of equipments for Day care centre for
hemoglobinopathiesHSS Blood 0.00 0.00
No new proposal for establishment of Day care centre in
current year.
6.1.1.9.b Other equipment / instrument HSS Blood 0.00 0.00
6.1.1.10 B16.1.4 Procurement of equipment: IMEP 0.00
6.1.1.10.a C.1.o Hub Cutter HSS HSS/ RI 0.00 0.00
6.1.1.10.b B16.1.6.2 Any other equipment (please specify) HSS HSS 0.00 0.00
6.1.1.11 B.25.2.1.a Procurement of bio-medical Equipment: NPPCD 0.00 Plan is to strengthen ENT wing of all DHHs. State to procure &
supply
6.1.1.11.a Procurement of equipment /instrument HSS NPPCD Per DHH 1500000 15.00 0 0.00
1.Surgical operating microscope
2.Two sets of Microdrills with 2 handpeices & burrhead
3.Two sets of micro-ear surgery instruments
4.Indigenous digital audiometer
5.Impedance audiometer
6.OAE machine
7.Sound treated room
6.1.1.11.b HSS NPPCD 0.00 0.00
6.1.1.12 Procurement of bio-medical Equipment: NOHP 0.00
6.1.1.12.a B.26.1.1 Dental Chair, Equipment HSS NOHP 0.00 0.00 No new proposal in the current year.
6.1.1.12.b Any other equipment (please specify) HSS NOHP 0.00 0.00
6.1.1.13 Procurement of bio-medical Equipment: NPPC 0.00
6.1.1.13.a B.27.1.4 Equipment HSS NPPC 0.00 0.00
6.1.1.13.b Any other equipment (please specify) HSS NPPC 0.00 0.00
6.1.1.14 Procurement of bio-medical Equipment: Burns & Injury 0.00
6.1.1.14.a B.28.2 Procurement of Equipment HSS Burns & injury 0.00 0.00
6.1.1.14.b Any other equipment (please specify) HSS Burns & injury 0.00 0.00
6.1.1.15 Procurement of bio-medical Equipment: IDSP 0.00
6.1.1.15.a E.3.1Non-recurring costs on account of equipment for District
Public Health Labs requiring strengthening. DCP IDSP 0.00 0.00
Already provisioned for all public health labs in previous
years.
6.1.1.15.b Any other equipment (please specify) DCP IDSP 0.00 0.00 Not Proposed
6.1.1.16 Procurement of bio-medical Equipment: NVBDCP 0.00
6.1.1.16.a F.2.1.c Health Products- Equipments (HPE) - GFATM DCPNVBDCP -
GFATM0 0 0.00 0.00 Not applicable.
Page 36 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.1.1.16.b Any other equipment (please specify) DCPNVBDCP -
GFATM0.00 0.00 Not applicable.
6.1.1.17 Procurement of bio-medical Equipment: NLEP 0.00
6.1.1.17.a G.1.4 Equipments DCP NLEP Per district 20000 0.20 0 0.00
6.1.1.18 Procurement of bio-medical Equipment: RNTCP 0.00
6.1.1.18.a H.17 Procurement of Equipment DCP RNTCP Lumsum 640000 6.40 0 0.00
1. Procurement of office equipment:
1.1. State TB Cell -Purchase of 2 nos of Printer @ Rs. 20,000/-
per unit x 2 units= Rs. 0.40 Lakhs
1.2. Dist. TB Centre - purchase of 10 nos of PC @ Rs. 60,000/-
per unit x 10 units= Rs. 6.00 Lakhs (State to procure & supply
as per need)
6.1.1.19 Procurement of bio-medical Equipment: NPCB 0.00
6.1.1.19.a I.2.1. Grant-in-aid for District Hospitals NCD NPCB Per DHH 4000000 40.00 0.00 Fund Kept at Sttatelevel-State to procure & supply
6.1.1.19.b I.2.2. Grant-in-aid for Sub Divisional Hospitals NCD NPCB Per SDH 2000000 20.00 0.00 State to procure & supply
6.1.1.19.c I.2.3 Grant-in-aid for Vision Centre (PHC) (Govt. + NGO) NCD NPCB 0.00 0 0.00
6.1.1.19.d I.2.4 Grant-in-aid for Eye Bank NCD NPCB Per unit (MCH) 4000000 40.00 0 0.00
Proposal for 2018-19: 3 eye banks to be established at 3 new
MCHs (SLN MCH, Koraput, PRN MCH Baripada & MCH at
Bolangir)- Fund Kept at State Level
6.1.1.19.e I.2.5 Grant-in-aid for Eye Donation Centre (New) NCD NPCB 0.00 0.00
6.1.1.20 Procurement of bio-medical Equipment: NMHP 0.00
6.1.1.20.a J.1.4 Equipment NCD NMHP 0.00 0.00
6.1.1.21 B16.1.10 Procurement of bio-medical Equipment: NPHCE 7.00
6.1.1.21.a K.1.1.1 Recurring GIA: Machinery & Equipment for DH NCD NPHCE Per unit 300000 3.00 0 0.00
6.1.1.21.b K.1.4.1 Aids and Appliances for Sub-Centre NCD NPHCE Per SC 10000 0.10 0 0.00
Proposed for all SCs of 5 districts i.e. Bolangir, Koraput,
Malkangiri, Nabarangpur & Nuapada targeted in 1st phase for
implementation of NCD programme (Total 1075 SCs) @
Rs.10,000/- per SC for providing walking sticks, walker,
Bedpans, Commode chairs etc for geriatric cases.
Procurement will be done at district level & distributed during
old age pension day to identified eligible cases as per advice
of treating physicians.
6.1.1.21.c K.2.1.2 Non-recurring GIA: Machinery & Equipment for DH NCD NPHCE Per unit 700000 7.00 1 7.00
6.1.1.21.d K.2.2 Non-recurring GIA: Machinery & Equipment for CHC NCD NPHCE 0.00 0.00Geriatric clinic will be integrated with existing OPD at CHC
level hence no additional fund proposed
6.1.1.21.e K.2.3 Non-recurring GIA: Machinery & Equipment for PHC NCD NPHCE 0.00 0.00
6.1.1.21.f Any other equipment (please specify) NCD NPHCE 0.00 0.00
6.1.1.22 Procurement of bio-medical equipment: NTCP 2.00
6.1.1.22.a M.1.5.1 Non-recurring: Equipment for DTCC NCD NTCP Lumpsum 0.00 0.00 Not Proposed
6.1.1.22.b M.2.3.1 Non-recurring: Equipment for TCC NCD NTCP Per Dist 200000 2.00 1 2.00
Procurement for District Tobacco CeassationCentre @ Rs.
2.00 Lakhs per Centre (items for procurement: Carbon
monoxide analyser (CO Analyser), Spirometer, Desktop
Computer & audio visual aids)
Budget proposed for 32 District Head Quarter Hospitals
(DHHs)
Page 37 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.1.1.22.c Any other equipment (please specify) NCD NTCP 0.00 0.00
6.1.1.23 Procurement of bio-medical equipment: NPCDCS 10.00
6.1.1.23.a O1.1.2.1 Non-recurring: Equipping Cardiac Care Unit (CCU)/ICU NCD NPCDCS 0.00 0.00
As there is no new proposal for establishment of ICU in 2018-
19, no procurement proposal submitted.
No of ICU operational:10 out of 13 sanctioned by GoO
6.1.1.23.b O1.1.2.2 Non recurring: Equipment for Cancer Care NCD NPCDCS 0.00 0.00
1. Day Care Chemo Therapy Cancers Have been established
30 DHHs out of 32 DHHs through the support of State budget.
Rest 2 will be operational by April 2018.
2. Strengthening Cancer diagnosis at DHH level- Approved
(Video colposcopy, PAP/ Scrape cytology, Cryomachine) for 7
DHHs where Population base screening programme has been
initiated.
6.1.1.23.c O1.1.3.2 Non-recurring: Equipment at District NCD clinic NCD NPCDCS Lumsum 500000 5.00 1 5.00
Strengthening of Lab-
1.Rs. 8.00 Lakh per DHH x 10 DHHs= Rs. 80.00 Lakhs
(Baragarh, Bhadrak, Boudh, Deogarh, Dhenkanal, Gajapati,
Jagatsingpur, Keonjhar, Nayagarh & Sonepur)
2.Rs. 5.00 Lakhs per DHH x 5 DHHs= Rs. 25.00 Lakhs
(Kendrapada, Balasore, Jharsuguda, Kandhamal, Jajapur)
6.1.1.23.d O1.1.4.1 Non-recurring: Equipment at CHC NCD clinic NCD NPCDCS Per unit 500000 5.00 1 5.00Strengthening of Lab-( for 63 SDH/ CHC) @ Rs. 5.00 Lakhs per
unit (provision for SDH & CHC FRUs)
6.1.1.23.e Any other equipment (please specify) NCD NPCDCS 0.00 0.00 Not Proposed
6.1.1.24 B.13.4Procurement of bio-medical equipment: National Dialysis
Programme0.00
6.1.1.24.a HSS HSS 0.00 0.00
6.1.1.24.b HSS HSS 0.00 0.00
6.1.1.25 Procurement of any other bio-medical equipment 0.00
6.1.1.25.a 0.00 0.00
6.1.1.25.b 0.00 0.00
6.1.2 Procurement of Other Equipment 3.05
6.1.2.1 Procurement of other equipment: RMNCH+A 0.00
6.1.2.1.a Furniture for paediatric OPD and ward RCH CH 0.00 0.00
6.1.2.1.b B16.1.6.3.3 Laptop for mobile health teams HSS RBSK 0.00 0.00 Already provisioned.
6.1.2.1.c B16.1.6.3.4 Desktop for DEIC HSS RBSK 0.00 0.00 Already provisioned.
6.1.2.1.d Any other equipment (please specify) 0.00 0.00
6.1.2.2 Procurement of other equipment: NVBDCP 0.00
6.1.2.2.a F.1.3.f Fogging Machine DCPNVBDCP -
AES/JE0.00 0.00
Not projected as the state has already the sanction in 2017
PIP which will be procured soon.
6.1.2.2.b F.1.5.a Spray Pumps & accessories DCPNVBDCP -
KalaAzar0 0.00 0.00 Not projected as kalaazar is not reported in the state.
6.1.2.2.c F.2.1.f Non-Health Equipment (NHP) - GFATM DCPNVBDCP -
GFATM0.00 0.00 Budget shifted to line no. 6.1.2.2.d
Page 38 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Any other equipment (please specify) DCP NVBDCP 0.00
Furniture/ Fixtures (State) DCP NVBDCP Lumpsum 200000 2.00
Furniture/ Fixtures (District) DCP NVBDCP Per Block 15000 0.15
Maintenance, Insurance, etc for MTS Motorbikes DCP NVBDCP Per Bike 7000 0.07
6.1.2.3 Procurement of other equipment: NLEP 0.00
6.1.2.3.a G.2.1 MCR DCP NLEP Per Pair 300 0.00 0 0.00
Cases under treatment: 8455 upto Dec 2017
Proposal is for 6000 pairs of MCR footwear and rest to be
supported by LEPRA India
6.1.2.3.b G.2.2 Aids/Appliance DCP NLEP Per District 17000 0.17 0 0.00
6.1.2.3.c Any other equipment (please specify) DCP NLEP 0.00 0.00
6.1.2.4 Procurement of other equipment: NPHCE 1.00
6.1.2.4.a K.2.1.1Non-recurring GIA: Furniture of Geriatrics Unit with 10 beds
and OPD facilities at DHNCD NPHCE per DHH 100000 1.00 1 1.00
Proposal is for 30 DHHs as no provision has been made in
earlier years under this head. Rest 2 DHHs will be covered
once indoor wards of the same institutions are ready
6.1.2.4.b Any other equipment (please specify) NCD NPHCE 0.00 0.00
6.1.2.5 Procurement of equipment for ICT 2.05
Tablets; software for H&WC and ANM/ MPW HSSHSS/ NHMSC -
CP2.05 IT support for H&WC.
For PHC level H&WC (Rural)- Non Recurring HSSHSS/ NHMSC -
CPPer unit 60000 0.60 0 0.00
For PHC level H&WC (Rural)- Recurring HSSHSS/ NHMSC -
CPPer unit 5000 0.05 33 1.65
For SC level H&WC - Non-Recurring HSSHSS/ NHMSC -
CPPer unit 20000 0.20 0 0.00
For SC level H&WC - Recurring HSSHSS/ NHMSC -
CPPer unit 5000 0.05 8 0.40
6.1.2.5.b Tablets; software for implementation of ANMOL HSS HSS Per tablet 18027.38 0.18 0 0.00 State to procure & Supply
6.1.2.6 Procurement of any other equipment 0.00
6.1.2.6.a B.18.2 Procurement for Universal Screening of NCDs NCD NPCDCS Lumpsum 0.00 Budget shifted to line no. 6.2.19.6
6.1.2.6.b Any other (please specify) NCD NPCDCS 0.00 0.00
6.1.3 Equipment maintenance 0.00
6.1.3.1 Maintenance of bio-medical equipment 0.00
6.1.3.1.a A.3.4 Repairs of Laparoscopes RCH FP 0.00 0.00 To be met out of Budget head 6.1.3.1.e
6.1.3.1.b E.3.3 Equipment AMC cost (DPHL) DCP IDSP 0.00 0.00To be met out of Comprehensive equipment maintenance
programme - Budget head 6.1.3.1.e
6.1.3.1.c H.5 Equipment Maintenance DCP RNTCP Lumpsum 0.00 0.00 To be met out of Budget head 6.1.3.1.e
6.1.3.1.d I.1.8 Maintenance of Ophthalmic Equipment NCD NPCB 0.00 0.00 To be met out of Budget head 6.1.3.1.e
6.1.3.1.eAny other bio-medical equipment maintenance (please
specify)HSS HSS Per annum 69300000 693.00 0 0.00 Fund Kept at State level
6.1.3.2 B16.1.1.3.1 Maintenance of Other equipment (please specify) 0.00
6.1.3.2.a 0.00 0.00
6.1.3.2.b 0.00 0.00
6.2 B.16.2 Procurement of Drugs and supplies 111.73
6.2.1 B.16.2.1 Drugs & supplies for MH 0.14
6.2.1.1 B.16.2.1.1 RTI /STI drugs and consumables HSS MH Per unit 13 0.00 0 0.00 State to procure & Supply
6.1.2.2.d
6.1.2.5.a
Page 39 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.2.1.2 B.16.2.1.2 Drugs for Safe Abortion (MMA) HSS MH Per pack 110 0.00 0 0.00 State to procure & Supply
6.2.1.3 B.16.2.1.4 RPR Kits HSS MH 0.00 0.00
6.2.1.4 B.16.2.1.5 Whole blood finger prick test for HIV HSS MH Per kit 18 0.00 0 0.00 State to procure & Supply
6.2.1.5 B.16.2.6.4.aIFA tablets for non-pregnant & non-lactating women in
Reproductive Age (20-49 years) HSS MH 0.00 0.00
6.2.1.6 B.16.2.6.4.bAlbendazole Tablets for non-pregnant & non-lactating women
in Reproductive Age (20-49 years) HSS MH 0.00 0.00
6.2.1.7 B.16.2.1.3.1 JSSK drugs and consumables 0.00
6.2.1.7.a B.16.2.6.5.a IFA tablets for Pregnant & Lactating Mothers HSS MH Per tab 0.16 0.00 0 0.00 State to procure & Supply
6.2.1.7.b B.16.2.6.5.b Folic Acid Tablets (400 mcg) for Pregnant & Lactating Mothers HSS MH 0.00 0.00
6.2.1.7.c Calcium tablets HSS MH Per tab 0.2143 0.00 0 0.00 State to procure & Supply
6.2.1.7.d Albendazole tablets HSS MH Per tab 0.77 0.00 0 0.00 State to procure & Supply
6.2.1.7.e B.16.2.1.3.1 Other JSSK drugs & consumables HSS MH 0.00 0.00
Any other Drugs & Supplies (Please specify) HSS MH 0.14
1. Misoprostol Tablet
2.Safe Delivery Kit for HIV
3.Glucose pouch for Screening of GDM cases
- Plasma calibrated glucometers, glucometer strips -
Provisioned under NCD programme
- Insulin syringe : State supply
-Drugs - Insulin : pre-mixed 30:70 & regular under State
budget
Misoprostol Tablet HSS MH Per Tab 1.5343 0.00 0 0.00 State to procure & Supply
Safe Delivery Kit for HIV HSS MH Per Kit 570 0.01 25 0.14
Drugs Specification : 1pkt/5 kit ( For 4 service providers , 1 for
baby)
Level at which the item would be used : SC/ PHC/ CHC/ SDH/
DH (DP only)
Glucose pouch for Screening of GDM cases HSS MH Per Pouch 40 0.00 0 0.00 State to procure & Supply
6.2.2 B.16.2.2 Drugs & supplies for CH 0.00
6.2.2.1 B.16.2.2.1 JSSK drugs and consumables HSS CH 0.00 0.00 To be meet out of State Supply
6.2.2.2 B.16.2.6 Drugs & Supplies for NIPI and National Deworming Day HSS CH 0.00 0.00
6.2.2.3 B.16.2.6.1.a IFA syrups (with auto dispenser) for children (6-60months) HSS CH Per bottle 6.037 0.00 0 0.00 State to procure & Supply
6.2.2.4 B.16.2.6.1.b Albendazole Tablets for children (6-60months) HSS CH 0.00 0.00 State to procure & Supply
6.2.2.5 B.16.2.6.2.aIFA tablets (IFA WIFS Junior tablets- pink sugar coated) for
children (5-10 yrs)HSS CH Per tab 0.12755 0.00 0 0.00 State to procure & Supply
6.2.2.6 B.16.2.6.2.b Albendazole Tablets for children (5-10 yrs) HSS CH Per tab 0.81 0.00 0 0.00 State to procure & Supply
6.2.2.7 B.16.2.2.2 Vitamin A syrup HSS CHPer Bottle
(50ml)26.58 0.00 0 0.00 State to procure & Supply
6.2.2.8 A.2.6Drugs for Management of Diarrhoea & ARI & micronutrient
malnutritionRCH CH 0.00
6.2.2.8.a B.16.2.2.3 ORS HSS CH 0.00 0.00 State to supply (both annual requirement & for IDCF)
6.2.1.8 B.16.2.1.3
Page 40 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.2.2.8.b B.16.2.2.4 Zinc HSS CH 0.00 0.00 State to supply (both annual requirement & for IDCF)
6.2.2.8.c Others (please specify) HSS CH 0.00 0.00
Inj. Gentamicin, Syp. Amoxicillin, Inj. Vitamin K & Inj.
Dexamethasone Sodium Phosphate as prescribed under
INAP/IAPPD to be met out of State Supply, as the drugs are a
part of the State's EDL
6.2.2.9 Any other Drugs & Supplies (Please specify) HSS CH 0.00 0.00
6.2.3 B.16.2.3 Drugs & supplies for FP 0.00
6.2.3.1 A.3.7.2 Nayi Pehl Kit RCH FP 0.00 0.00
6.2.3.2 B.16.2.3.1 Any other Drugs & Supplies (Please specify) HSS FP 0.00 0.00
6.2.4 Drugs & supplies for AH 0.00
6.2.4.1 B.16.2.6.3.a IFA tablets under WIFS (10-19 yrs) HSS AH Per tab 0.16 0.00 0 0.00 State to procure & Supply
6.2.4.2 B.16.2.6.3.b Albendazole Tablets under WIFS (10-19 yrs) HSS AH Per tab 0.81 0.00 0 0.00 State to procure & Supply
6.2.4.3 B.16.2.9.1 Sanitary napkins procurement HSS AH Lumpsum 80409000 804.09 0 0.00 State to procure & Supply
6.2.4.4 Any other Drugs & Supplies (Please specify) HSS AH 0.00 0.00
6.2.5 Drugs & supplies for RBSK 2.40
6.2.5.1 B.16.2.7.1 Medicine for Mobile health team HSS RBSK Per team 10000 0.10 24 2.40
Expenditure will be on medicines those are not under State
essential drug list like Hydroxyzine Syrup 10mg./5ml,
Hydroxyzine Tab 25mg., Fusidic acid/Cream/Ointment,
Vitamin D: Cholecalciferol granules as sachets etc.
6.2.5.2 Any other Drugs & Supplies (Please specify) HSS RBSK 0.00 0.00 Not proposed.
6.2.6 Drugs & supplies for ASHA 1.96
6.2.6.1 B.16.2.10.1 New ASHA Drug Kits HSS NHSRC - CP 0.00 0.00 Integrated with SC drugs
6.2.6.2 B.16.2.10.2 Replenishment of ASHA drug kits HSS NHSRC - CP 0.00 0.00 Integrated with SC drugs
6.2.6.3 B.16.2.10.3.1 New ASHA HBNC Kits HSS NHSRC - CP Per Kit 800 0.01 14 0.11 For newly selected ASHAs
6.2.6.4 B.16.2.10.3.1.2 Replenishment of ASHA HBNC kits HSS NHSRC - CP Per Kit 300 0.00 617 1.85 Replenishment of kit items of 40% ASHAs
6.2.6.5 Any other Drugs & Supplies (Please specify) HSS NHSRC - CP 0.00 0.00
6.2.7 Drugs & supplies for Blood services & disorders 23.40
6.2.7.1 B.16.2.11.1 Drugs and Supplies for blood services HSS Blood 0.00 0.00
Provision has been made under State budget for drugs &
supplies @Rs.8.00 crs p.a. which will be centrally procured &
supplied to all blood banks through Odisha Medical
Corporation.
Drugs and Supplies for blood related disorders-
HaemoglobinopathiesHSS Blood 23.40
Drugs & consumables for Day Care Center HSS Blood Per Unit 2340000 23.40 1 23.40
Reagent & consumables & test done through outsourced
agencyHSS Blood Lumpsum 5000000 50.00 0 0.00
For Sickle cell referral institute at VSS MCH, Burla (test done -
slide test, electrophoresis, CBC, SPLC, Bio-chem, RTPCR etc) -
Procurement of Hydroxyurea for Sickle cell referral institute HSS Blood Per capsul 2.2 0.00 0 0.00 State to procure & Supply
6.2.8 Supplies for IMEP 1.38
6.2.8.1 C.1.n Red/Black plastic bags etc. RCH RI Per bag 3 0.00 24592 0.74
6.2.8.2 C.1.o Bleach/Hypochlorite solution/ Twin bucket RCH RIPer cold chain
point1500 0.02 43 0.65
6.2.7.2 B.16.2.11.1
Page 41 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.2.8.3 B.16.2.4 Any other supplies (please specify) 0.00 0.00
6.2.9 B.16.2.8 Drugs & supplies for AYUSH 0.00
6.2.9.1 AYUSH drugs for co-locational units HSS HSS/ AYUSH 0.00 0.00
6.2.9.2 HSS HSS/ AYUSH 0.00 0.00
6.2.10 Supplies for NOHP 5.00
Consumables for NOHP HSS NOHP 5.00 Proposal- Consumables for colocated Dental wing
Consumables for DHH level colocated Dental wing HSS NOHP Per DHH 200000 2.00 1 2.00DHH level colocated Dental wing
@ Rs.2.00 lakhs per DHH per annum x 32 DHH
Consumables for SDH/ CHC level colocated Dental wing HSS NOHP Per SDH/ CHC 20000 0.20 15 3.00SDH/ CHC level colocated Dental wing
@ Rs.0.20 lakhs per SDH/ CHC per annum x 404 insts.
6.2.11 Supplies for NIDDCP 0.00
6.2.11.1 D.4 Supply of Salt Testing Kit RCH NIDDCPPer ASHA for
12 kits270 0.00 0 0.00
It is to monitor the quality of Iodised salt using STK by ASHA in
17 high burden district out of 30 districts.
6.2.11.2 Any other supplies (please specify) RCH NIDDCP 0.00 0.00
6.2.12 Drugs & supplies for NVBDCP 0.00
6.2.12.1 B.16.2.11.3.a Chloroquine phosphate tablets HSS NVBDCP Per Unit 1 0.00 0 0.00
6.2.12.2 B.16.2.11.3.b Primaquine tablets 2.5 mg HSS NVBDCP Per Unit 0 0.00 0 0.00
6.2.12.3 B.16.2.11.3.c Primaquine tablets 7.5 mg HSS NVBDCP Per Unit 0 0.00 0 0.00
6.2.12.4 B.16.2.11.3.d Quinine sulphate tablets HSS NVBDCP Per Unit 1 0.00 0 0.00
6.2.12.5 B.16.2.11.3.e Quinine Injections and Artisunate Injection HSS NVBDCP Per Unit 16 0.00 0 0.00
6.2.12.6 B.16.2.11.3.f DEC 100 mg tablets HSS NVBDCP 0 0.00 0 0.00
6.2.12.7 B.16.2.11.3.g Albendazole 400 mg tablets HSS NVBDCP 0 0.00 0 0.00
6.2.12.8 B.16.2.11.3.h Dengue NS1 antigen kit HSS NVBDCP lumpsum 3000000 30.00 0 0.00
6.2.12.9 B.16.2.11.3.iTemephos, Bti (AS) / Bti (wp) (for polluted & non polluted
water)HSS NVBDCP Lumpsum 12500000 125.00 0 0.00
6.2.12.10 B.16.2.11.3.j Pyrethrum extract 2% for spare spray HSS NVBDCP Per Unit 1333 0.01 0 0.00
6.2.12.11 B.16.2.11.3.k ACT ( For Non Project states) HSS NVBDCP 0.00 0.00
6.2.12.12 B.16.2.11.3.l RDT Malaria – bi-valent (For Non Project states) HSS NVBDCP 0.00 0.00
6.2.12.13 F.1.2.b
Test kits (Nos.) to be supplied by GoI (kindly indicate numbers
of ELISA based NS1 kit and Mac ELISA Kits required
separately)
DCP
NVBDCP -
Dengue
Chikungunya
0.00 0.00Proposed under Decentralised Commodity(Annexed in the
Budget Sheet)
6.2.12.14 F.1.3.e Procurement of Insecticides (Technical Malathion) DCPNVBDCP -
AES/JE0.00 0.00 Not Proposed
6.2.12.15 F.1.3.l Payment to NIV towards JE kits at Head Quarter DCPNVBDCP -
AES/JE0.00 0.00 Not Proposed, as it is to be met from dte.NVBDCP Budget.
6.2.12.16 F.2.1.d Procurment under GFATM DCPNVBDCP -
GFATM0.00 0.00 Not Proposed
6.2.12.17 B.16.2.11.3.m Any other drugs & supplies (please specify) HSS NVBDCP lumpsum 3500000 35.00 0 0.00
Cash grant proposed
1.SP( 2.5 % flow) Deltamethrin flow
2.Technical Malathion
6.2.10.1 B.16.2.11.2
Page 42 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.2.13 Drugs & supplies for NLEP 0.00
6.2.13.1 G.1.4 Supportive drugs, lab. Reagents DCP NLEP Lump Sum 2520000 25.20 0 0.00
Proposal 2018-19:
1.Refampician tabs
2.Clofazimine
3. Prednisolone for reaction management
State to procure & Supply
6.2.13.2 Any other drugs & supplies (please specify) DCP NLEP 0.00 0.00
6.2.14 Drugs & supplies for RNTCP 4.14
Laboratory Materials DCP RNTCP 4.14
State Lavel DCP RNTCP 0.00
Lab materials for EQA activity at STDC DCP RNTCP Lumpsum 300000 3.00 0 0.00 Lab consumables for trainings, preparation of Panel slides etc
Lab materials & consumables for Culture/DST activity DCP RNTCP Lumpsum 900000 9.00 0 0.00For IRL and other Accredited Culture & DST labs in Govt.
sector including Medical Colleges.
District Lavel DCP RNTCP 4.14
Purchase of Lab material for Smear Microscopy DCP RNTCPPer Suspect
case45 0.00 5929 2.67
Purchase of Lab material for Fluorescent Microscopy at DTC DCP RNTCPPer Suspect
case100 0.00 769 0.77
Purchase of Lab Materials by Districts for sample collection,
packaging and transportion to C-DST laboratory DCP RNTCP Per Case 190 0.00 116 0.22
Infection control measures for CBNAAT sites DCP RNTCP Per annum 48000 0.48 1 0.48 Budget proposed @ Rs. 4000/- per month
6.2.14.2 H.15 Procurement of Drugs DCP RNTCP lumpsum 2880000 28.80 0 0.00 State to procure & Supply
6.2.14.3 Any other drugs & supplies (please specify) DCP RNTCP 0.00 0.00
6.2.15 B.16.2.11.4 Drugs and supplies for NPCB 5.00
6.2.15.1 B.16.2.11.4.aAssistance for consumables/drugs/medicines to the
Govt./District Hospital for Cat sx etc.@ Rs.450/- per caseHSS NPCB Per Case 1000 0.01 500 5.00
Any other drugs & supplies (please specify) HSS NPCB 0.00Budget not Approved. State to include the drugs in State
Essential Drug List
Free Medicine for patitents treated at Govt. Hospital HSS NPCB Per district 150000 1.50 0.00
Surgical instruments for cataract surgery HSS NPCB Per set 12000 0.12 0.00
6.2.16 B.16.2.11.5 Drugs and supplies for NMHP 10.00
6.2.16.1 Drugs and Consumables for NMHP HSS NMHP Per District 1000000 10.00 1 10.00
If EDL items are available under Niramaya, they must be
disbursed to PwMI on priority basis by the districts. In case of
non availability of EDL items, and need of urgent emergency
psychotropic drugs prescribed by psychiatric specialist of
MCH/ DMHP unit, then the prescription must be reimbursed
at district level for PwMI.
6.2.16.2 HSS NMHP 0.00 0.00
6.2.17 B.16.2.11.6 Drugs and supplies for NPHCE 0.00
6.2.17.1 HSS NPHCE 0.00 0.00
6.2.17.2 HSS NPHCE 0.00 0.00
6.2.15.2
6.2.14.1 H.2
Page 43 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.2.18 Drugs and supplies for NTCP 0.00
6.2.18.1 B.16.2.11.7 Procurement of medicine & consumables for TCC under NTCP HSS NTCP 0.00 0.00To be met out of committed unspent balance. Fund approved
in 2017-18 @ Rs. 2.00 Lakhs per district.
6.2.18.2 Any other drugs & supplies (please specify) HSS NTCP 0.00 0.00
6.2.19 B.16.2.11.8 Drugs & Supplies for NPCDCS 5.00
6.2.19.1 B.16.2.11.8.a Drugs & supplies for District NCD Clinic HSS NPCDCS 0.00 0.00 State to procure & Supply
Drugs & supplies for District CCU/ICU &Cancer Care HSS NPCDCS 5.00
ICU (Caters to Cardiac & Strock patients along with other
critical cases)HSS NPCDCS Per unit 200000 2.00 0 0.00
For district Chempotherapy unit HSS NPCDCS Per unit 500000 5.00 1 5.00
6.2.19.3 B.16.2.11.8.c Drugs & supplies for CHC N C D Clinic HSS NPCDCS 0.00 0.00Integrated with existing system, hence no additional budget
proposed
6.2.19.4 B.16.2.11.8.d Drugs & supplies for PHC level HSS NPCDCS 0.00 0.00Integrated with existing system, hence no additional budget
proposed
6.2.19.5 B.16.2.11.8.e Drugs & supplies for Sub-Centre level HSS NPCDCS 0.00 0.00Integrated with existing system, hence no additional budget
proposed
6.2.19.6 B18.2 Drugs & supplies for Universal Screening of NCDs NCD NPCDCS Lumpsum 26416000 264.16 0 0.00
6.2.20 B.13.4 Drugs & Supplies for National Dialysis Programme 0.00
6.2.20.1 HSS HSS 0.00 0.00
6.2.20.2 HSS HSS 0.00 0.00
6.2.21 B.16.2.5 Free drug services 0.00
6.2.21.1 B.16.2.5.1 NHM Free Drug services HSS HSS 0.00 0.00
6.2.21.2 B.16.2.5.2 Other Free Drug Services (State not opted 16.2.5.1) HSS HSS 0.00 0.00
6.2.22 B18.3 Drugs & Supplies for Health & Wellness Centres (H&WC) 53.30
6.2.22.1 Lab Strengthening HSS HSS/ NHSRC -CP Per unit 100000 1.00 41 41.00Approved for Lab strengthening for PHC (Rural)& SC level
H&WC
6.2.22.2 Lab Consumables HSS HSS/ NHSRC -CP Per unit 30000 0.30 41 12.30Approved for Lab Consumables PHC level H&WCs (Rural) & SC
level H&WC
6.3 Procurement of Other Drugs and supplies (please specify) 0.00
6.3.1 Any other (please specify) 0.00 0.00
6.4 B.16.3 National Free Diagnostic services 96.01
6.4.1 B.16.3.1 Free Pathological services HSS HSS Per case 68.2 0.00 72412 49.38
Free Radiological services HSS HSS 28.27
CT Scan HSS HSS Per CT Scan 1199 0.01 0 0.00
Digitisation, Transmission & reporting of X-ray at DHH HSS HSS Per X-ray 60 0.00 11046 6.63
Digitisation, Transmission & reporting of X-ray at SDH HSS HSS Per X-ray 60 0.00 5475 3.29
Digitisation, Transmission & reporting of X-ray at CHC HSS HSS Per X-ray 60 0.00 21900 13.14
TB diagnostics (Due to mandate by GoI for X-ray for all
presumptive TB / TB suspect cases) HSS HSS Per X-ray 60 0.00 8690 5.21
6.2.19.2 B.16.2.11.8.b
6.4.2 B.16.3.2
Page 44 of 280
Kandhamal_Procurement
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
6.4.3 A.1.6.1 Free Diagnostics for Pregnant women under JSSK RCH MH Per case 100 0.00 17342 17.34
Budget revised in view of compulsory Ultrasound for every
pregnant women at least once as mandated under PMSMA
programme.
6.4.4 A.2.9.1 Free Diagnostics for Sick infants under JSSK RCH CH Per Case 100 0.00 1017 1.02
6.4.5 Any other (please specify) HSS HSS Per MRI scan 3204 0.03 0 0.00
6.5 Procurement (Others) 0.00
6.5.1 H.16 Procurement of Vehicles DCP RNTCP Per vechile 65000 0.65 0 0.00
6.5.2 H.11 Procurement of sleeves and drug boxes DCP RNTCPPer sleev &
drug box150 0.00 0 0.00 State to procure & Supply
6.5.3 Any other (please specify) DCP RNTCP 0.00 0.00
SL No Component Colour code
1 HSS
2 IDSP
3 NLEP
4 NMHP
5 NOHP
6 NPCB
7 NPCDCS
8 NPHCE
9 NPPC
10 NPPCD
11 NTCP
12 NVBDCP
13 RCH
14 RI
15 RNTCP
Page 45 of 280
Kandhamal_Referral Trans.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
7 Referral Transport 28.88
7.1 A.1.6.4 Free Referral Transport - JSSK for Pregnant Women RCH MH-JSSK Per case 500 0.01 0 0.00 Fund placed at State level for payment centrally
7.2 A.2.9.2 Free Referral Transport - JSSK for Sick Infants RCH CH-JSSK Per case 500 0.01 0 0.00 Fund placed at State level for payment centrally
7.3 B12.2.9.1 Drop back scheme for sterilization clients HSS FP Per case 250 0.00 810 2.03 Cases targeted for female sterilisation at public health inst
7.4 B12 National Ambulance Service HSS HSS 0.00
7.4.1 B12.1 Ambulance/EMRI Capex HSS HSS 0.00 0.00
7.4.2 B12.1.1 State basic ambulance/ 102 Capex HSS HSS 0.00 0.00
7.4.3 B12.1.2 Advanced life support Capex HSS HSS 0.00 0.00
7.4.4 B12.1.3 EMRI Capex-BLS HSS HSS 0.00 0.00
7.4.5 B12.1.4 EMRI Capex-ALS HSS HSS 0.00 0.00
7.4.6 B12.2 Operating Cost /Opex for ambulance HSS HSS 0.00 0.00
7.4.7 B12.2.1 State basic ambulance/102 Opex HSS HSS 0.00 0.00
7.4.8 B12.2.2 Operating Cost /Opex for ASL ambulance HSS HSS 0.00 0.00
7.4.9 B12.2.3 Opex EMRI-BLS HSS HSS Lumpsum 84960000 849.60 0 0.00 Fund placed at State level for payment centrally
7.4.10 B12.2.4 Opex EMRI-ALS HSS HSS Per ALS 240000 2.40 0 0.00 Fund placed at State level for payment centrally
7.4.11 B12.2.7 Call centre-capex HSS HSS 0.00 0.00 Fund placed at State level for payment centrally
7.4.12 B12.2.8 Call centre-opex HSS HSS Lumpsum 4401600 44.02 0 0.00 Fund placed at State level for payment centrally
Patient Support & Transportation Charges CD RNTCP 25.86
Sputum collection and transportation from Non DMC PHIs to
DMC/DTC (For Tribal District ) CD RNTCP Per case 25 0.00 368 0.09
Sputum collection and transportation from Non DMC PHIs to
DMC/DTC (For Non-Tribal District ) CD RNTCP Per case 15 0.00 0 0.00
Sputum sample transportation cost from DTC / DMC /
Collection centre to Culture / DST lab CD RNTCP Per case 250 0.00 78 0.19
Sputum collection & transport for C&DST by individual/
human volunteer CD RNTCP Per visit 250 0.00 539 1.299
Transportation charges - actual travel fare by public transport
for MDR TB patient and 1 attendant for travel to DTC/DOTS
Plus Site/IRL for examination
CD RNTCP Per case 500 0.01 76 0.37
Transportation charges - actual travel fare by public transport
for MDR TB patient and 1 attendant for travel to DTC/DOTS
Plus Site/IRL for follow up examination
CD RNTCP Per case 100 0.00 284 0.27
Travel support to co-infected TB patients (+1 attendant) for
first visit to ART Centre CD RNTCP Per case 1000 0.01 9 0.09
Incentive for TB patients after successful completion of
treatment in tribal areas: CD RNTCP Per case 750 0.01 1412 10.21
Nutrition support for TB patients: For New Cases CD RNTCPPer case per
month500 0.01 2172 10.47
Nutrition support for TB patients: For Previously Treated
cases CD RNTCP
Per case per
month500 0.01 417 2.01
Nutrition support for TB patients: For DR TB cases CD RNTCPPer case per
month500 0.01 180 0.87
Annexure for Referral Transport
7.5 H.18
Page 46 of 280
Kandhamal_Referral Trans.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
7.6 O.2.2.1.6 Transport of referred cases including home based care 0.00
7.6.1 O.2.1.6.6.i District NCD Clinic NCD NPCDCS 0.00 0.00108 emergency ambulance services is operation in the state.
Hence, no additional fund proposed under this head
7.6.2 O.2.1.6.6.ii CHC NCD Clinic NCD NPCDCS 0.00 0.00108 emergency ambulance services is operation in the state.
Hence, no additional fund proposed under this head
7.7 J.1.6 Ambulatory Services NCD NMHP Per District 100000 1.00 1 1.00
Referral Transport Mechanism for PwMI:
The patients having severe episodes of mental illness, severe
mental disorder may be supported for referral from home to
DMHP unit at DHH and higher centres of treatment availing
public transport system/ reserved vehicle in case of
emergency medical condition (transportation cost to
reimbursed by the DMHP Unit)
7.8 Any other activity (please specify) 0.00 0.00
SL No Component Colour code
1 RCH
2 HSS
3 RNTCP
4 NPCDCS
5 NMHP
Page 47 of 280
Kandhamal_HR Service Delivery
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8 Human Resources 856.92
8.1 Human Resources HSS HSS 722.60
8.1.1 B.30.1 Nurses and Paramedical Staff HSS HSS 183.16
8.1.1.1 B.30.1.1 ANMs HSS HSS Per Month 13970 0.14 39 45.77
2017-18 Base - Rs.10644/- (Base rationalized as per State
decision) + Increment (5%) - Rs.532/- = Base 2018-19
@Rs.11176/- + PI (Max 25%) - Rs.2794/- = Rs.13970/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
B.30.1.2 Staff Nurses HSS HSS
B.30.1.2 Under RCH HSS HSS Per Month 17953 0.18 71 107.07
B14.3.2.1 Day Care Center (Hemoglobinopathy) HSS HSS Per Month 17953 0.18 2 3.02
B.30.1.2 Under NPCDCS HSS HSS Per Month 17953 0.18 0 0.00
B.30.1.2 Under NPHCE HSS HSS Per Month 17953 0.18 0 0.00
8.1.1.3 Other Nurses HSS HSS 0.00 3.35
8.1.1.3.a Psychiatric Nurse HSS HSS Per Month 19970 0.20 1 1.68
Budget Shifted from 8.1.1.12
2017-18 Base - Rs.15215/- + Increment (5%) - Rs.761/- = Base
2018-19 @Rs.15976/- + PI (Max 25%) - Rs.3994/- = Rs.19970/-
p.m.
Programme -NMHP
Budgeted 70%.
Details in 8.1.Human Resource Annex8.1.1.3.b Nurses for Geriatric care/ palliative care HSS HSS 0.00 0.00
8.1.1.3.c Community Nurse HSS HSS Per Month 19970 0.20 1 1.68
Budget Shifted from 8.1.1.12
2017-18 Base - Rs.15215/- + Increment (5%) - Rs.761/- = Base
2018-19 @Rs.15976/- + PI (Max 25%) - Rs.3994/- = Rs.19970/-
p.m.
Programme -NMHP
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.1.4 B.30.1.3 Health Assistant/ Lady Health Visitor/ Public Health Nurse HSS HSS 0.00 0.00
B.30.1.4 Laboratory Technicians HSS HSS
1. For LT
2017-18 Base - Rs.11011/- (Base rationalized as per State
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453- p.m.
Details in 8.1.Human Resource Annex
Annexure for Human Resources - Service Delivery
8.1.1.2
2017-18 Base - Rs.13678/- (Base rationalized as per State
decision) + Increment (5%) - Rs.684/- = Base 2018-19
@Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.1.5
Page 48 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
B.30.1.4 Under RCH HSS HSS Per Month 14453.00 0.14 5 6.07
B.30.1.4 Under Sickle cell HSS HSS Per Month 14453.00 0.14 1 1.21
B14.3.2.1 Under Day Care Center (Hemoglobinopathy) HSS HSS Per Month 14453.00 0.14 1 1.21
B.30.1.4 Under IDSP HSS HSS Per Month 14453.00 0.14 2 2.43
B.30.1.4 Under RNTCP HSS HSS Per Month 14453.00 0.14 4 4.86
B.30.1.4 Under NPCDCS HSS HSS Per Month 14453.00 0.14 0 0.00
B.30.1.4 Under NPPCF HSS HSS Per Month 14453.00 0.14 0 0.00
B.30.1.4 Under NIDDCP HSS HSS Per Month 14453.00 0.14 0 0.00
B.30.1.4 Sr. LT (RNTCP) HSS HSS Per Month 28123.00 0.28 0 0.00
2017-18 Base - Rs.21427/- (Base rationalized as per State
decision) + Increment (5%) - Rs.1071/- = Base 2018-19
@Rs.22498/- + PI (Max 25%) - Rs.5624/- = Rs.28122/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.1.6 B.30.1.5 OT Technician HSS HSS 0.00 0.00
8.1.1.7 B.30.1.6Other Technicians at DH (ECG/ ECO, EEG, Dermatology, Cyto,
PFT etc.)HSS HSS 0.00 0.00
Pharmacist HSS HSS
Under Sickle cell HSS HSS Per Month 14453 0.14 0 0.00
Pharmacist (State, dealing with programme - RNTCP) HSS HSS Per Month 28122 0.28 0 0.00
8.1.1.9 B.30.1.8 Radiographer/ X-ray technician HSS HSS 0.00 0.00
8.1.1.10 B.30.1.9 Physiotherapist/ Occupational Therapist HSS HSS Per Month 32414 0.32 3 8.17
2017-18 Base - Rs.24696/- + Increment (5%) - Rs.1235/- =
Base 2018-19 @Rs.25931/- + PI (Max 25%) - Rs.6483/- =
Rs.32414/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.1.11 B.30.1.10 Dietician/ Nutritionist HSS HSS 0.00 0.00
8.1.1.12 B.30.1.11 Others (incl. Community Health Worker, PMW) HSS HSS Lumpsum 0.00 0.00
1. Psychiatric Nurse shifted to 8.1.1.3.a
2.Communitry Nurse shifted to 8.1.1.3.c
Revised as per recommendation of NPCC
8.1.2 B.30.2 Specialists HSS HSS 0.00
8.1.2.1 B.30.2.1 Obstetricians and Gynaecologists HSS HSS 0.00 0.00
8.1.2.2 B.30.2.2 Paediatricians HSS HSS 0.00 0.00
8.1.2.3 B.30.2.3 Anaesthetists HSS HSS 0.00 0.00
8.1.2.4 B.30.2.5 Surgeons HSS HSS 0.00 0.00
8.1.2.5 B.30.2.6 Radiologists HSS HSS 0.00 0.00
8.1.2.6 B.30.2.7 Pathologists/ Haemotologists HSS HSS 0.00 0.00
8.1.3 B.30.3 Other Specialists HSS HSS 0.00
8.1.1.5
8.1.1.8 B.30.1.7
1. For Pharmacist (Sickle cell)
2017-18 Base - Rs.11011/- (Base rationalized as per State
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/- p.m.
2.Pharmacist (State, dealing with programme - RNTCP)
2017-18 Base - Rs.21427/- (Base rationalized as per State
decision) + Increment (5%) - Rs.1071/- = Base 2018-19
@Rs.22498/- + PI (Max 25%) - Rs.5624/- = Rs.28122/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 49 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.3.1B.30.3.1/B.30.2.
4Physician/Consultant Medicine HSS HSS Per Month 92688 0.93 0 0.00
At KBK district (2017-18 Base - Rs.63000/- + Increment (5%) -
Rs.3150/- = Base 2018-19 @Rs.66150/- + PI (Max 25%) -
Rs.16538/- + Rs.10000/- KBK allowance = Rs.92688/- p.m.)
Programme:1.NPHCE
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.3.2 B.30.3.2 Psychiatrists HSS HSS 0.00 0.00
8.1.3.3 B.30.3.3 Orthopaedics HSS HSS 0.00 0.00
8.1.3.4 B.30.2.8 ENT HSS HSS 0.00 0.00
8.1.3.5 B.30.3.4 Ophthalmologists HSS HSS Per Month 92688 0.93 0 0.00
Proposed positions -3 positions dropped
Programme-NPCB
Budget :
At KBK district : 2017-18 Base - Rs.63000/- + Increment (5%) -
Rs.3150/- = Base 2018-19 @Rs.66150/- + PI (Max 25%) -
Rs.16538/- + Rs.10000/- KBK allowance = Rs.92688/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.3.6 B.30.3.5 Dermatologists HSS HSS 0.00 0.00
8.1.3.7 B.30.3.6 Venereologist HSS HSS 0.00 0.00
8.1.3.8 B.30.3.7 Microbiologists (MD) HSS HSS Per Month 73509 0.74 0 0.00
Programme -RNCTP
2017-18 Base - Rs.56007/- + Increment (5%) - Rs.2800/- =
Base 2018-19 @Rs.58807/- + PI (Max 25%) - Rs.14702/- =
Rs.73509/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.3.9 B.30.3.8 Forensic Specialist HSS HSS 0.00 0.00
8.1.3.10 B.30.3.9 Others HSS HSS 0.00 0.00
8.1.4 B.30.4 Dental Staff HSS HSS 0.00
8.1.4.1 B.30.4.1 Dental Surgeons HSS HSS 0.00 0.00
8.1.4.2 B.30.4.2 Dental MO HSS HSS 0.00 0.00
8.1.4.3 B.30.4.3 Other Dental Staff HSS HSS 0.00
8.1.4.3.a B.30.4.3.a Dental Hygienist HSS HSS 0.00 0.00
8.1.4.3.b B.30.4.3.b Dental Technician HSS HSS 0.00 0.00
8.1.4.3.c B.30.4.3.c Dental Assistants HSS HSS 0.00 0.00
8.1.4.3.d B.30.4.4 Others HSS HSS 0.00 0.00
B.30.5 Medical Officers HSS HSS 19.19
Medical Officers at Day Care Center (Hemoglobinopathy) HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 1 6.40
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
Under NMHP HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 1 6.40
8.1.5
1.Budget proposed for Medical Officer-
for RTI/STI clinic - Positions dropped
1.Gross Remuneration : Rs.76150/- p.m.
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance
2. Gross Remuneration : Rs.66150/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment
(5%) - Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/-
3. Gross Remuneration : Rs.66670/- p.m.
At KBK district : 2017-18 Base - Rs.48510/- + Increment (5%) -
Rs.2426/- = Base 2018-19 @Rs.50936/- + PI (Max 25%) -
Rs.12734/- + Rs.3000/- KBK allowance = Rs.66670/- p.m.
4. Gross Remuneration : Rs.63670/- p.m.
At Non-KBK district : 2017-18 Base - Rs.48510/- + Increment
(5%) - Rs.2426/- = Base 2018-19 @Rs.50936/- + PI (Max 25%) -
Rs.12734/- = Rs.63670/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
B14.3.2.1
B.30.5
Page 50 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
Under NPCDCS HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 1 6.40
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
Under RNTCP (DTC (15) & Sr. MO-DRTB Centre (4)) HSS HSS
At KBK district HSS HSS Per Month 66670 0.67 0 0.00
At Non-KBK district HSS HSS Per Month 63670 0.64 0 0.00
Under Sickle Cell HSS HSS Per Month 63670 0.64 0 0.00
Viral Hepatites (Model Treatment Centre) HSS HSS Per Month 76150 0.76 0 0.00
8.1.6 B.30.6 AYUSH Staff HSS HSS 121.35
AYUSH MOs HSS HSS
At KBK district HSS HSS Per Month 31405 0.31 46 121.35
At Non-KBK district HSS HSS Per Month 27405 0.27 0 0.00
8.1.6.2 B.30.6.2 Pharmacist - AYUSH HSS HSS 0.00 0.00
8.1.6.3 B.30.6.3 Others HSS HSS Per Month 4000 0.04 0 0.00
Remuneration for Multipurpose worker (Masseur) for Pancha
Karma unit at DHH
Details in 8.1.Human Resource Annex
8.1.7 B.30.7 RBSK teams (Exclusive mobile health team & DEIC Staff) HSS HSS 216.59
8.1.7.1 B.30.7.1 RBSK mobile teams HSS HSS 183.93
MOs- AYUSH HSS HSS
At KBK district HSS HSS Per Month 31405 0.31 48 126.62
At Non-KBK district HSS HSS Per Month 27405 0.27 0 0.00
8.1.7.1.b B.30.7.1.b MOs- MBBS HSS HSS 0.00 0 0.00
8.1.7.1.c B.30.7.1.c Staff Nurse HSS HSS 0.00 0.00
8.1.5
1.Budget proposed for Medical Officer-
for RTI/STI clinic - Positions dropped
1.Gross Remuneration : Rs.76150/- p.m.
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance
2. Gross Remuneration : Rs.66150/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment
(5%) - Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/-
3. Gross Remuneration : Rs.66670/- p.m.
At KBK district : 2017-18 Base - Rs.48510/- + Increment (5%) -
Rs.2426/- = Base 2018-19 @Rs.50936/- + PI (Max 25%) -
Rs.12734/- + Rs.3000/- KBK allowance = Rs.66670/- p.m.
4. Gross Remuneration : Rs.63670/- p.m.
At Non-KBK district : 2017-18 Base - Rs.48510/- + Increment
(5%) - Rs.2426/- = Base 2018-19 @Rs.50936/- + PI (Max 25%) -
Rs.12734/- = Rs.63670/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
B.30.5
8.1.6.1 B.30.6.1
Budget :
At KBK district : 2017-18 Base - Rs.20880/- + Increment (5%) -
Rs.1044/- = Base 2018-19 @Rs.21924/- + PI (Max 25%) -
Rs.5481/- + Rs.4000/- KBK allowance = Rs.31405/- p.m.
At Non-KBK district : 2017-18 Base - Rs.20880/- + Increment
(5%) - Rs.1044/- = Base 2018-19 @Rs.21924/- + PI (Max 25%) -
Rs.5481/- = Rs.27405/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.1.a B.30.7.1.a
Budget :
At KBK district : 2017-18 Base - Rs.20880/- + Increment (5%) -
Rs.1044/- = Base 2018-19 @Rs.21924/- + PI (Max 25%) -
Rs.5481/- + Rs.4000/- KBK allowance = Rs.31405/- p.m.
At Non-KBK district : 2017-18 Base - Rs.20880/- + Increment
(5%) - Rs.1044/- = Base 2018-19 @Rs.21924/- + PI (Max 25%) -
Rs.5481/- = Rs.27405/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 51 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.7.1.d B.30.7.1.d ANM HSS HSS Per Month 13970 0.14 24 28.16
2017-18 Base - Rs.10644/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.532/- = Base 2018-19
@Rs.11176/- + PI (Max 25%) - Rs.2794/- = Rs.13970/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.1.e B.30.7.1.e Pharmacists HSS HSS Per Month 14453 0.14 24 29.14
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/- p.m.
Details in 8.1.Human Resource Annex
8.1.7.2 B.30.7.2 DEIC HSS HSS 32.66
Paediatrician HSS HSS
At KBK district HSS HSS Per Month 92688 0.93 1 7.79
At Non-KBK district HSS HSS Per Month 82688 0.83 0 0.00
MO, MBBS HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 1 6.40
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
8.1.7.2.c B.30.7.2.c MO, Dental HSS HSS Per Month 44569 0.45 1 3.74
Programme-RCH
2017-18 Base - Rs.33957/- + Increment (5%) - Rs.1698/- =
Base 2018-19 @Rs.35655/- + PI (Max 25%) - Rs.8914/- =
Rs.44569/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.d B.30.7.2.d SN HSS HSS Per Month 17953 0.18 1 1.51
Programme-RCH
2017-18 Base - Rs.13678/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.684/- = Base 2018-19
@Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.a B.30.7.2.a
Programme -RCH
Budget :
At KBK district : 2017-18 Base - Rs.63000/- + Increment (5%) -
Rs.3150/- = Base 2018-19 @Rs.66150/- + PI (Max 25%) -
Rs.16538/- + Rs.10000/- KBK allowance = Rs.92688/- p.m.
At Non-KBK district : 2017-18 Base - Rs.63000/- + Increment
(5%) - Rs.3150/- = Base 2018-19 @Rs.66150/- + PI (Max 25%) -
Rs.16538/- = Rs.82688/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.b B.30.7.2.b
Programme -RCH
Budget :
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance = Rs.76156/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment
(5%) - Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- = Rs.66150/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 52 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Physiotherapist HSS HSS
At KBK district HSS HSS Per Month 33414 0.33 1 2.81
At Non-KBK district HSS HSS Per Month 32414 0.32 0 0.00
Audiologist & speech therapist HSS HSS
At KBK district HSS HSS Per Month 33414 0.33 1 2.81
At Non-KBK district HSS HSS Per Month 32414 0.32 0 0.00
Psychologist HSS HSS
At KBK district HSS HSS Per Month 21969 0.22 1 1.85
At Non-KBK district HSS HSS Per Month 20969 0.21 0 0.00
Optometrist HSS HSS
At KBK district HSS HSS Per Month 17785 0.18 1 1.49
8.1.7.2.e B.30.7.2.e
Programme-RCH
Budget :
At KBK district : 2017-18 Base - Rs.24696/- + Increment (5%) -
Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- + Rs.1000/- KBK allowance = Rs.33414/- p.m.
At Non-KBK district : 2017-18 Base - Rs.24696/- + Increment
(5%) - Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- =Rs.32414/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.f B.30.7.2.f
Programme-RCH
Budget :
At KBK district : 2017-18 Base - Rs.24696/- + Increment (5%) -
Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- + Rs.1000/- KBK allowance = Rs.33414/- p.m.
At Non-KBK district : 2017-18 Base - Rs.24696/- + Increment
(5%) - Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- =Rs.32414/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.g B.30.7.2.g
Programme wise no of position:
1.RCH - 32 (KBK-11 + Non KBK-21)
Budget :
At KBK district : 2017-18 Base - Rs.15976/- + Increment (5%) -
Rs.799/- = Base 2018-19 @Rs.16775/- + PI (Max 25%) -
Rs.4194/- + Rs.1000/- KBK allowance = Rs.21969/- p.m.
At Non-KBK district : 2017-18 Base - Rs.15976/- + Increment
(5%) - Rs.799/- = Base 2018-19 @Rs.16775/- + PI (Max 25%) -
Rs.4194/- = Rs.20969/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.h B.30.7.2.h
Programme wise no of position:
1.RCH - 32 (KBK-11 + Non KBK-21)
Budget :
At KBK district : 2017-18 Base - Rs.12789/- + Increment (5%) -
Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- + Rs.1000/- KBK allowance = Rs.17785/- p.m.
At Non-KBK district :2017-18 Base - Rs.12789/- + Increment
(5%) - Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- = Rs.16785/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 53 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
At Non-KBK district HSS HSS Per Month 16785 0.17 0 0.00
Early interventionist cum special educator HSS HSS
At KBK district HSS HSS Per Month 21969 0.22 1 1.85
At Non-KBK district HSS HSS Per Month 20969 0.21 0 0.00
8.1.7.2.j B.30.7.2.j Social worker HSS HSS 0.00 0.00
8.1.7.2.k B.30.7.2.k Lab technician HSS HSS Per Month 14453 0.14 1 1.21
Programme-RCH
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.l B.30.7.2.l Dental technician HSS HSS Per Month 14453 0.14 1 1.21
Programme-RCH
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.8 B.30.8 Staff for NRC HSS HSS 26.59
8.1.8.1 B.30.8.1 Medical Officers HSS HSS 0.00 0.00
8.1.8.2 B.30.8.2 Staff Nurse HSS HSS 0.00 0.00
8.1.8.3 B.30.8.3 Cook cum caretaker HSS HSS Per Month 9551 0.10 9 7.22
Total NRC - 67 @3 per NRC = 201 positions
2017-18 Base - Rs.7277/- + Increment (5%) - Rs.364/- = Base
2018-19 @Rs.7641/- + PI (Max 25%) - Rs.1910/- = Rs.9551-
p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Medical Social worker for NRC HSS HSS
At KBK district HSS HSS Per Month 20970 0.21 3 5.28
At Non-KBK district HSS HSS Per Month 19970 0.20 0 0.00
8.1.7.2.h B.30.7.2.h
Programme wise no of position:
1.RCH - 32 (KBK-11 + Non KBK-21)
Budget :
At KBK district : 2017-18 Base - Rs.12789/- + Increment (5%) -
Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- + Rs.1000/- KBK allowance = Rs.17785/- p.m.
At Non-KBK district :2017-18 Base - Rs.12789/- + Increment
(5%) - Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- = Rs.16785/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.7.2.i B.30.7.2.i
Programme-RCH
Budget :
At KBK district : 2017-18 Base - Rs.15976/- + Increment (5%) -
Rs.799/- = Base 2018-19 @Rs.16775/- + PI (Max 25%) -
Rs.4194/- + Rs.1000/- KBK allowance = Rs.21969/- p.m.
At Non-KBK district : 2017-18 Base - Rs.15976/- + Increment
(5%) - Rs.799/- = Base 2018-19 @Rs.16775/- + PI (Max 25%) -
Rs.4194/- = Rs.20969/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.8.4 B.30.8.4
Budget proposed for NRC Counsellor
At KBK district : 2017-18 Base - Rs.15215/- + Increment (5%) -
Rs.761/- = Base 2018-19 @Rs.15976/- + PI (Max 25%) -
Rs.3994/- + Rs.1000/- KBK allowance = Rs.20970/- p.m.
At Non-KBK district : 2017-18 Base - Rs.15215/- + Increment
(5%) - Rs.761/- = Base 2018-19 @Rs.15976/- + PI (Max 25%) -
Rs.3994/- = Rs.19970/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 54 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.8.5 B.30.17.3 Feeding demonstrator for NRC HSS HSS 0.00 0.00
8.1.8.6 B.30.8.5 Others HSS HSS Per Month 13970 0.14 12 14.08
Budget proposed for ANM for NRC
2017-18 Base - Rs.10644/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.532/- = Base 2018-19
@Rs.11176/- + PI (Max 25%) - Rs.2794/- = Rs.13970/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.9 B.30.9 Staff for SNCU/ NBSU HSS HSS 92.18
8.1.9.1 B.30.9.1 Paediatrician HSS HSS 0.00 0.00
Medical Officers HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 7 43.92
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
Staff Nurse HSS HSS
12 beded @ 10 SN HSS HSS Per Month 17953 0.18 20 30.16
24 beded @ 20 SN HSS HSS Per Month 17953 0.18 0 0.00
36 beded @ 30 SN HSS HSS Per Month 17953 0.18 0 0.00
48 beded @ 40 SN HSS HSS Per Month 17953 0.18 0 0.00
NBSU @ 4 SN HSS HSS Per Month 17953 0.18 4 6.03
KMC unit @ 4 SN HSS HSS Per Month 17953 0.18 8 12.06
8.1.9.4 B.30.9.4 Others HSS HSS Per Month 13970 0.14 0 0.00
ANM - for Lactation Mgt. Unit
Base 2018-19 @Rs.11176/- + PI (Max 25%) - Rs.2794/- =
Rs.13970/- p.m.
8.1.10 Staff for Obstetric ICUs/HDUs HSS HSS 0.00
8.1.10.1 Anesthetists HSS HSS 0.00 0.00
8.1.10.2 Medical Officers HSS HSS 0.00 0.00
8.1.10.3 Staff Nurses HSS HSS 0.00 0.00
8.1.9.2 B.30.9.2
Programme wise no of position:
1.SNCU - 155 (KBK-50 + Non KBK-105) (14 New MOs for 4
New SNCUs & 2 Expansion of Existing SNCUs from 12 bedded
to 24 bedded)
2.Day Care Centre (approved in old FMR code B14.3.2.1
during 2017-18) - 3 (KBK-1 + Non KBK-2)
Budget :
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance = Rs.76150/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment
(5%) - Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- = Rs.66150/- p.m.
Budgeted 68%.
Details in 8.1.Human Resource Annex
8.1.9.3 B.30.9.3
2017-18 Base - Rs.13678/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.684/- = Base 2018-19
@Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 55 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.10.4 Others HSS HSS 0.00 0.00
8.1.11 B.30.10 Staff for MMU/ MHV HSS HSS 0.00
Medical Officers HSS HSS
At KBK district HSS HSS Per Month 76150 0.76 0 0.00
At Non-KBK district HSS HSS Per Month 66150 0.66 0 0.00
8.1.11.2 B.30.10.2 Staff Nurse/ ANM HSS HSS Per Month 17953 0.18 0 0.00
SN (MMU)
2017-18 Base - Rs.13678/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.684/- = Base 2018-19
@Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.11.3 B.30.10.3 Pharmacist HSS HSS Per Month 14453 0.14 0 0.00
Pharmacist (MMU)
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.11.4 B.30.10.4 Lab technician HSS HSS Per Month 14453 0.14 0 0.00
LT & X-ray Technician (MMU)
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.11.5 B.30.10.5 Others HSS HSS Per Month 14470 0.14 0 0.00
Driver (MMU)
2017-18 Base - Rs.11025/- + Increment (5%) - Rs.551/- = Base
2018-19 @Rs.11576/- + PI (Max 25%) - Rs.2894/- = Rs.14470/-
p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.11.1 B.30.10.1
Medical Officer, MMU
Budget :
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance = Rs.76150/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment
(5%) - Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- = Rs.66150/- p.m.
Budgeted 73%.
Details in 8.1.Human Resource Annex
Page 56 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.12 B.30.10 Staff for Health & Wellness Centre (H&WC) HSS HSS 38.40
8.1.12.1 Mid-level Service Provider HSS HSS Per Month 25000 0.25 8 24.00
Budget approved @ Rs. 25000/- PM for 221 MLSPs for SC
level H&WC with the following conditions:
For newly recruited MLSPs under NHM, up to Rs. 25000/- pm
may be paid once the training programme begins for existing
staff of NHM who are undergoing training programme:
Existing salary to be paid during the training period. Once the
staff is posted in the H&WC, Rs. 25,000/- PM/ existing salary ,
which ever is higher may be paid.
8.1.12.2 Performance incentive for Mid-level service providers HSS HSS Per Month 15000 0.15 8 14.40
Approved for incentive of Rs. 15000/- PM for all 221 MLSPs,
once the staff are posted at the SC level H&WC. Incentive to
be paid as per GoI norms. Approval is subjected to the
conditions that total remuneration for staff under regular
cadre posted at H&WC should not exceed Rs. 40,000/- Pm
8.1.13 B.30.11 Other Staff HSS HSS 21.68
Counsellor HSS HSS
At KBK district HSS HSS Per Month 20970 0.21 3 5.28
At Non-KBK district HSS HSS Per Month 19970 0.20 0 0.00
Psychologist HSS HSS
Clinical Psychologist under NMHP HSS HSS
At KBK district HSS HSS Per Month 33414 0.33 1 2.81
At Non-KBK district HSS HSS Per Month 32414 0.32 0 0.00
Psychiatric Social worker under NMHP HSS HSS
At KBK district HSS HSS Per Month 33414 0.33 1 2.81
At Non-KBK district HSS HSS Per Month 32414 0.32 0 0.00
8.1.13.3 B.30.17.2 Lactation Counsellors for high case load facilities HSS HSS 0.00 0.00
8.1.13.1 B.30.11.1
Programme -RCH
Budget :
At KBK district : 2017-18 Base - Rs.15215/- + Increment (5%) -
Rs.761/- = Base 2018-19 @Rs.15976/- + PI (Max 25%) -
Rs.3994/- + Rs.1000/- KBK allowance = Rs.20970/- p.m.
At Non-KBK district : 2017-18 Base - Rs.15215/- + Increment
(5%) - Rs.761/- = Base 2018-19 @Rs.15976/- + PI (Max 25%) -
Rs.3994/- = Rs.19970/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.13.2 B.30.11.2
At KBK district : 2017-18 Base - Rs.24696/- + Increment (5%) -
Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- + Rs.1000/- KBK allowance = Rs.33414/- p.m.
At Non-KBK district : 017-18 Base - Rs.24696/- + Increment
(5%) - Rs.1235/- = Base 2018-19 @Rs.25931/- + PI (Max 25%) -
Rs.6483/- = Rs.32414/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 57 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.13.4 B.30.3.7 Microbiologists HSS HSS Per Month 50991 0.51 1 4.28
Programme- IDSP
2017-18 Base - Rs.38850/- + Increment (5%) - Rs.1943/- =
Base 2018-19 @Rs.40793/- + PI (Max 25%) - Rs.10198/- =
Rs.50991/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.13.5 B.30.11.14 Audiometrician/ Audiologist HSS HSS 0.00 0.00
8.1.13.6 B.30.11.3 Multi Rehabilitation worker HSS HSS Per Month 19970 0.20 0 0.00
Programme- NPHCE
2017-18 Base - Rs.15215/- + Increment (5%) - Rs.761/- = Base
2018-19 @Rs.15976/- + PI (Max 25%) - Rs.3994/- = Rs.19970/-
p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex8.1.13.7 B.30.11.5 Rehabilitation Therapist HSS HSS 0.00 0.00
Social Worker HSS HSS
At KBK district HSS HSS Per Month 21968 0.22 1 1.85
At Non-KBK district HSS HSS Per Month 20968 0.21 0 0.00
8.1.13.9 B.30.11.15 Health Educator HSS HSS 0.00 0.00
TBHV DCP RNTCP
At KBK district DCP RNTCP Per Month 17585 0.18 1 1.48
At Non-KBK district DCP RNTCP Per Month 16785 0.17 0 0.00
Lab Attendant/ Assistant HSS HSS
Lab Assistant HSS HSS Per Month 11576 0.12 1 0.97
Lab Attendant HSS HSS Per Month 8683 0.09 1 0.73
8.1.13.8 B.30.11.4
Programme : HSS (RBSK+NTCP)
Budget :
At KBK district : 2017-18 Base - Rs.15975/- + Increment (5%) -
Rs.799/- = Base 2018-19 @Rs.16774/- + PI (Max 25%) -
Rs.4194/- + Rs.1000/- KBK allowance = Rs.21968/- p.m.
At Non-KBK district : 2017-18 Base - Rs.15975/- + Increment
(5%) - Rs.799/- = Base 2018-19 @Rs.16774/- + PI (Max 25%) -
Rs.4194/-= Rs.20968/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.13.10 H.12
Programme : RNTCP
Budget :
At KBK district : 2017-18 Base - Rs.12789/- + Increment (5%) -
Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- + Rs.800/- KBK allowance = Rs.17585/- p.m.
At Non-KBK district : 2017-18 Base - Rs.12789/- + Increment
(5%) - Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- = Rs.16785/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.13.11 B.30.11.7
Programme:
1.Lab Assistant under IDSP
2017-18 Base - Rs.8820/- + Increment (5%) - Rs.441/- = Base
2018-19 @Rs.9261/- + PI (Max 25%) - Rs.2315/- = Rs.11576/-
p.m.
2.Lab Attendant under IDSP
2017-18 Base - Rs.6615/- + Increment (5%) - Rs.331/- = Base
2018-19 @Rs.6946/- + PI (Max 25%) - Rs.1737/- = Rs.8683/-
p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 58 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.13.12 B.30.11.8 OT Assistant HSS HSS 0.00 0.00
8.1.13.13 B.30.11.10 CSSD Asstt. HSS HSS 0.00 0.00
8.1.13.14 B.30.11.11 Darkroom Asstt. HSS HSS 0.00 0.00
8.1.13.15 B.30.11.12 Cold Chain & Vaccine Logistic Assistant HSS HSS 0.00 0.00
Ophthalmic Assistant/ Refractionist HSS HSS
At KBK district HSS HSS Per Month 17585 0.18 1 1.48
At Non-KBK district HSS HSS Per Month 16785 0.17 0 0.00
8.1.13.17 B.30.11.16 Store Keeper/ Store Asstt HSS HSS 0.00 0.00
8.1.13.18 B.30.11.17 Audiometrics Asstt. HSS HSS 0.00 0.00
8.1.13.19 B.30.11.17 Instructor for Hearing Imapired Children HSS HSS 0.00 0.00
8.1.13.20 B.30.11.17 Field Worker HSS HSS 0.00 0.00
8.1.13.21 B.30.11.6 Biomedical Engineer HSS HSS 0.00 0.00
8.1.13.22 B.30.11.17 Others HSS HSS 0.00 0.00
8.1.14 B.30.12 Blood Bank/ BSU/Mobile Blood Vehicle HSS HSS 2.43
8.1.14.1 B.30.12.1 Doctor - Pathologist HSS HSS Per Month 66156 0.66 0 0.00
Programme :Mobile Blood Service
Budget :
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) -
Rs.2520/- = Base 2018-19 @Rs.52920/- + PI (Max 25%) -
Rs.13230/- + Rs.10000/- KBK allowance = Rs.76156/- p.m.
Budgeted 80%.
Details in 8.1.Human Resource Annex
8.1.14.2 B.30.12.2 Staff Nurse HSS HSS 0.00 0.00
8.1.14.3 B.30.12.3 Male/ Female Nursing Attendant HSS HSS 0.00 0.00
8.1.14.4 B.30.12.4 Blood Bank Technician HSS HSS Per Month 14453 0.14 2 2.43
Budget proposed for
1.LT at Mobile Blood Service
2.LT at Blood Bank
2017-18 Base - Rs.11011/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.551/- = Base 2018-19
@Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.13.16 B.30.11.13
Programme :NPCB
Budget :
At KBK district : 2017-18 Base - Rs.12789/- + Increment (5%) -
Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- + Rs.800/- KBK allowance = Rs.17585/- p.m.
At Non-KBK district : 2017-18 Base - Rs.12789/- + Increment
(5%) - Rs.639/- = Base 2018-19 @Rs.13428/- + PI (Max 25%) -
Rs.3357/- = Rs.16785/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
Page 59 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Others HSS HSS
Counsellor cum Public Relation Officer Per Month 20970 0.21 0 0.00
Attendant Per Month 8415 0.08 0 0.00
8.1.15 B.30.13 Administrative Staff HSS HSS 1.04
8.1.15.1 B.30.13.1 Hospital Administrator HSS HSS 0.00 0.00
8.1.15.2 B.30.13.2 Hospital Superintendent HSS HSS 0.00 0.00
8.1.15.3 B.30.13.3 Block Medical Officer/ Medical Superintendent HSS HSS 0.00 0.00
8.1.15.4 B.30.13.4 Public Health Manager/ Specialist HSS HSS 0.00 0.00
8.1.15.5 B.30.13.5 Housekeeper/ Manager HSS HSS 0.00 0.00
8.1.15.6 B.30.13.6 Medical Records Officer HSS HSS 0.00 0.00
Medical Records Asstt./ Case Registry Asstt. HSS HSS
At KBK district HSS HSS Per Month 12376 0.12 1 1.04
At Non-KBK district HSS HSS Per Month 11576 0.12 0 0.00
8.1.15.8 B.30.13.8 Accounts/ Finance HSS HSS 0.00 0.00
8.1.15.9 B.30.13.9 Admin Officer/ Asstt HSS HSS 0.00 0.00
8.1.15.10 B.30.13.10 Statistical Asstt. HSS HSS 0.00 0.00
8.1.15.11 B.30.13.11 Office Asstt HSS HSS 0.00 0.00
8.1.15.12 B.30.13.13 Ambulance Services (1 driver + 2 Tech.) HSS HSS 0.00
8.1.15.12.a B.30.13.13.a Driver HSS HSS 0.00 0.00
8.1.15.12.b B.30.13.13.b Technician HSS HSS 0.00 0.00
8.1.15.13 B.30.13.14 Others HSS HSS 0.00 0.00
8.1.16 B.30.14 Support Staff for Health Facilities HSS HSS 0.00
8.1.16.1 B.30.11.9 General Duty Attendant/ Hospital Worker HSS HSS Lumpsum 12445 0.12 0 0.00
Programme :NPHCE
2017-18 Base - Rs.9482/- + Increment (5%) - Rs.474/- = Base
2018-19 @Rs.9956/- + PI (Max 25%) - Rs.2489/- = Rs.12445/-
p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.16.2 B.30.13.12 Cold Chain Handlers HSS HSS 0.00 0.00
8.1.16.3 Multi Task Worker HSS HSS 0.00 0.00
Budget proposed for
1.Counsellor cum Public Relation Officer at Mobile Blood
Service
2017-18 Base - Rs.15215/- (Base rationalized as per State's
decision) + Increment (5%) - Rs.761/- = Base 2018-19
@Rs.15976/- + PI (Max 25%) - Rs.3994/- + KBK allowance
Rs.1000/- = Rs.20970/- p.m.
2.Attendant at Mobile Blood Service @Rs.8415/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.15.7 B.30.13.7
Programme :NMHP
Budget :
At KBK district : 2017-18 Base - Rs.8820/- + Increment (5%) -
Rs.441/- = Base 2018-19 @Rs.9261/- + PI (Max 25%) -
Rs.2315/- + Rs.800/- KBK allowance = Rs.12376/- p.m.
At Non-KBK district : 2017-18 Base - Rs.8820/- + Increment
(5%) - Rs.441/- = Base 2018-19 @Rs.9261/- + PI (Max 25%) -
Rs.2315/- = Rs.11576/- p.m.
Budgeted 70%.
Details in 8.1.Human Resource Annex
8.1.14.5 B.30.12.5
Page 60 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.1.16.4 Hospital Attendant HSS HSS 0.00 0.00
8.1.16.5 Sanitary Attendant HSS HSS 0.00 0.00
8.1.16.6 Facility based Data Entry Operation (DEO) HSS HSS Per month 19970 0.20 0 0.00
Approved for 1 Medical Social worker (to work as Peer
Educator at Model Treatment Centre for treatment of Viral
Hepatitis )
2017-18 Base - Rs.15215/- + Increment (5%) - Rs.761/- =Base
2018-19 @Rs.15976/- + PI (Max 25%) - Rs.3994/- =
Rs.19970/- p.m.
Budgeted for 6 Months
8.1.16.7 B.30.14.3 Support Staff for Health Facilities on outsourcing basis HSS HSS 0.00 0.00
8.2 B.30.20 Annual increment for all the existing positions HSS HSS 0.00 0.00
8.3 B.30.21EPF (Employer's contribution) @ 13.36% for salaries <=
Rs.15,000 pmHSS HSS Lumpsum 152691000 1526.91 0 0.00
8.4 Incentives and Allowances HSS HSS 134.32
8.4.1 B.30.15 Additional Allowances/ Incentives to Medical Officers HSS HSS Lumpsum 144000 1.44 1 1.44
1.Incentivisation of LSAS Doctor : Base incentive @Rs.3000/-
p.m. for trained LSAS doctors for conducting min 2 CS p.m &
PI up to Rs.2000/- @Rs.500/- per case
2.Incentivisation of EMoC Doctor : Base incentive @Rs.3000/-
p.m. for trained LSAS doctors for conducting min 2 CS p.m &
PI up to Rs.2000/- @Rs.500/- per case
8.4.2 B.30.18
Incentive/ Awards etc. to SN, ANMs etc. (Including
group/team based incentives at sub-centre/PHC for primary
care)
HSS HSS Lumpsum 1220305 12.20 1 12.20
Team Based Incentives:
As per GoI guideline vide No. Z-15015/11/2017-NHM-I dated
16.06.2017, team based incentives for the triple AAA
(ANM/ASHA/ AWW) has been proposed.
Budget :
1. Eligible to get 25% of incentives - @Rs.50000/-
2. Eligible to get 50% of incentives - @Rs.25000/- per SC
8.4.3 B.30.16Honorarium for Paediatric ECO, ENT specialist,
Orthopediatrician, Ophthalmologist, PsychiatricsHSS HSS Per visit 1800 0.02 17 0.31 Expenditure is made as per actuals for functional DEICs
8.4.4 B.30.17.1Honorarium to ICTC counsellors for Adolescent Health
activitiesHSS HSS 0.00 0.00
8.4.5 A.3.5.3 Performance reward if any HSS FP 0.00 0.00
8.4.6 A.3.2.2
Incentive to provider for IUCD insertion at health facilities
(including fixed day services at SHC and PHC) [Provide
breakup: Public Sector (@Rs. 20/insertion]
RCH FP 0.00 0.00 To be met out of IMEP fund under State budget
8.4.7 A.3.2.3Incentive to provider for PPIUCD services @Rs 150 per
PPIUCD insertionRCH FP
Per service
provider150 0.00 3639 5.46 Unit no as per 1.2.2.2.b
Page 61 of 280
Kandhamal_HR Service Delivery
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
8.4.8 A.3.2.4Incentive to provider for PAIUCD Services @Rs 150 per
PAIUCD insertionRCH FP
Per service
provider150 0.00 263 0.39 Unit no as per 1.2.2.2.c
Team based incentives for Health & Wellness Centers (H&WC) HSS HSS 81.13
For PHC level HWCs (Rural) HSS HSS Per Inst. 200000 2.00 33 66.00@ Rs. 1.00 lakhs for PHC team and Rs. 1.00 lakhs for
collocated SHC team
For SC level HWCs HSS HSS Per Inst. 189120 1.89 8 15.13
At 10% of all salaries. Approximately 40% of salary of
contractual staff should be linked to performance; regular
staff should not get more than 10% of the team incentive as
incentive.
Others (please specify) HSS HSS Lumpsum 33.38Special performance based incentive for high priority districts
(HPDs), earlier approved under B.30.19
Pregnant women line listed & treated for severe anaemia HSS MH Per case 100 0.00 174 0.17
Provision is for HPDs for identification, line listing of sever
anaemic pregnant women by HW (F) & confirmation of HB%
(<7gm%) at facility level by MO & initiate treatment along
with follow up visit at least for two consecutive months.
Incentive to ANM @Rs.100/- per case
Pregnant women line listed & treated for high risk
pregnancies (for detection & timely referral of at least 7% of
high risk cases out of total ANC registered) - Hypertension,
any bleeding during ANC, Bad Obstetric History, women with
blood disorder etc. (Excluding anaemia)
HSS MH Per SC 1000 0.01 52 0.52
Pregnant women line listed & treated for high risk
pregnancies (for detection & timely referral of at least 7% of
high risk cases out of total ANC registered) - Hypertension,
any bleeding during ANC, Bad Obstetric History, women with
blood disorder etc. (Excluding anaemia)
Home deliveries attended by SBA trained ANM HSS MH Per case 1000 0.01 1181 11.81
Institutional deliveries at SCs designated as delivery points
(DP) conducting >5* deliveries/ monthHSS MH Per case 300 0.00 168 0.50
Institutional deliveries at APHCS/PHCs designated as delivery
points (DP) conducting >15* deliveries/monthHSS MH Per case 300 0.00 1080 3.24
Institutional deliveries at CHCs(Non FRU) conducting 50*
deliveries/monthHSS MH Per case 300 0.00 552 1.66
C-sections per month at Sub district CHC/ FRUs. HSS MH Per case 3000 0.03 168 5.04
C-sections per month at District Hospital FRUs HSS MH Per case 3000 0.03 348 10.44
B.30.19.4Special incentive for service providers (CH) - Incentive to
SNCU team for performanceHSS CH Per qtr 75000 0.75 0 -
Incentive to be released to units on meeting the following
conditionalities:
Bed occupancy ≥ 70%
Inborn admission ≤ 40%
Death rate ≤15%
Funds kept at State level. District to release fund if the same
inst qualified as per given criteria.
SL No Component Colour code
1 RCH
2 HSS
3 RNTCP
8.4.9 B18.3
8.4.10
B.30.19.3
Page 62 of 280
Kandhamal_Training
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9 Training 100.32
9.1Setting Up & Strengthening of Skill Lab/ Other Training
Centres16.80
9.1.1 A.9.1.2.2 Setting up of Skill Lab RCH MH Lumpsum 4850000 48.50 0 0.00Skills lab need to be established at new College of Nursing at
SCBMCH Cuttack.
9.1.2 A.9.3.1.1 Setting up of SBA Training Centres RCH MH 0.00 0.00
9.1.3 A.9.3.2.1 Setting up of EmOC Training Centres RCH MHPer training
center900000 9.00 0 0.00 Proposed at Dept. of OG, SCB MCH, Cuttack
9.1.4 A.9.3.3.1 Setting up of Life saving Anaesthesia skills Training Centres RCH MH 0.00 0.00 No new proposal
Strengthening of Existing Training Institutions/Nursing
School (excluding infrastructure and HR)RCH
HSS / MH/
Nursing
Directorate
16.80
Maintenance of Equipment, mannequins for skills lab RCH
HSS / MH/
Nursing
Directorate
per unit per
annum20000 0.20 2 0.40
Recurring expenses for Skill lab RCH
HSS / MH/
Nursing
Directorate
per unit per
annum100000 1.00 2 2.00
Outsourcing of teaching services for computer lab at 18
ANMTC & 8 GNMTCRCH
HSS / MH/
Nursing
Directorate
per unit per
annum45000 0.45 2 0.90
Pre-service development cost (recurring cost like Includes
stationery cost, office supplies, internet and telephone
expenses, AMC, recurring costs for labs, subscription of
journals and other miscellaneous expenses AND POL or
arranging transportation for clinical site and community visits
of nursing students
RCH
HSS / MH/
Nursing
Directorate
per unit per
annum300000 3.00 2 6.00 Proposed at nursing institute- College of Nursing at Cuttack.
Technical Advisory Group meeting at state level RCH
HSS / MH/
Nursing
Directorate
per meeting 20000 0.20 0 -
TAG meeting at SNC RCH
HSS / MH/
Nursing
Directorate
per meeting 5000 0.05 0 -
SBMR workshop RCH
HSS / MH/
Nursing
Directorate
per meeting 150000 1.50 0 -
Rewards & Recognition for meritorious students RCH
HSS / MH/
Nursing
Directorate
Lumpsum 75000 0.75 0 -
Strengthening Nursing Education RCH
HSS / MH/
Nursing
Directorate
Annexure for Training and Capacity Building
9.1.5 A.9.10.1
Page 63 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Full scholarship: SC/ST student in KBK & KBK+ districts for
GNM & BSc(N) courseRCH
HSS / MH/
Nursing
Directorate
Per student 50000 0.50 15 7.50
Scholarship is given to SC and ST students of Pvt. GNM & B.Sc
Nursing institutions (recognised by INC) for promoting
Nursing education.
Partial scholarship: SC/ST student in non KBK districts for
GNM & BSc(N) courseRCH
HSS / MH/
Nursing
Directorate
For BSc (N) RCH
HSS / MH/
Nursing
Directorate
Per student 15300 0.15 0 -
For GNM RCH
HSS / MH/
Nursing
Directorate
Per student 12650 0.13 0 -
9.1.6 A.9.2 Development of training packages RCH Training 0.00
9.1.6.1 A.9.2.1Development/ translation and duplication of training
materialsRCH MH/ Training 0.00 0.00
9.1.6.2 A.9.6.8 Training / Orientation technical manuals RCH FP 0.00 0.00
9.1.7 Any other (please specify) 0.00 0.00
9.2 HR for Skill Lab/ Training Institutes/ SIHFW 0.00
9.2.1 A.9.1.2.1 HR for Skill Lab RCH MH 0.00 0.00
1. Doctor (1 per Comprehensive Skill lab)- Total 3 Nos
Base Remuneration 2017-18 @Rs.63,000/- + Increment (5%)
Rs.3150/- = Revised based 2018-19 @Rs.66,150/- +
Rs.16538/- PI (max 25%) + Rs.10000/- KBK allowance =
Rs.92,668/- p.m x 12 months x 3 nos=Rs. 33.36 Lakhs
2. Nurse Trainer (5 per Comprehensive Skill lab): Total 15
Nos
Base Remuneration 2017-18 @Rs.31201/- + Increment (5%)
Rs.1560- = Revised based 2018-19 @Rs.32,761- + Rs.8190/- PI
(max 25%) = Rs.40,951/- p.m x 12 months x 15 Nos=Rs. 73.71
Lakhs
3. DEO (1 per Comprehensive Skill lab): Total 3 Nos
Base Remuneration [email protected]/- + Increment (5%)
Rs.662/- = Revised based 2018-19 @Rs.13982/- + Rs.3473/- PI
(max 25%) = Rs.17,365/- p.m x 12 months x 3 Nos=Rs. 6.25
Lakhs
Total: Rs. 113.32 Lakhs
As there are approved positions, remuneration may be paid
as per the revised rate mentioned above
HR for Nursing Schools/ Institutions/ Nursing Directorate/
SIHFWRCH Training/ MH Details at 16.8.PM Annex
Nursing Cell (Directorate of Nursing) RCH Training/ MH Lumpsum 2369035 23.69 0 0.00
SNC at College of Nursing RCH Training/ MH Lumpsum 1341934 13.42 0 0.00
SIHFW RCH Training/ MH Lumpsum 4721900 47.22 0 0.00
9.2.3 Any other (please specify) 0.00 0.00
9.3 Annual increment for all the existing positions 0.00 0.00
9.1.5 A.9.10.1
9.2.2 A.9.1.1
Page 64 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.4EPF (Employer's contribution) @ 13.36% for salaries <=
Rs.15,000 pmLumpsum 17000 0.17 0 0.00
9.5 Trainings 0.00 83.52
9.5.1 Maternal Health Trainings 6.77
9.5.1.1 A.1.4 Maternal Death Review Trainings RCH MH 0.00 0.00
9.5.1.2 A.9.1.2.3Onsite mentoring at Delivery Points/ Nursing Institutions/
Nursing SchoolsRCH MH Per visit 8000 0.08 0 0.00
9.5.1.3 TOT for Skill Lab RCH MH 0.00 0.00
9.5.1.4 Trainings at Skill Lab RCH MH 0.00 0.00
9.5.1.5 A.9.3.1.2 TOT for SBA RCH MH 20/batch 100000 1.00 0 0.00
Training of Staff Nurses/ANMs / LHVs in SBA RCH MH 3.75
21 days SBA training of SNs at District level RCH MH Per participant 15000 0.15 12 1.80
3 days refresher training of SNs at district level RCH MH Per participant 2500 0.03 0 - 1 day exclusively for Dakshata refresher to trained SNs.
21 day SAB training for AYUSH MOs at the District level RCH MH Per Person 15000 0.15 0 -
21 days SBA training of ANMs / LHVs at District level RCH MH Per participant 15000 0.15 13 1.95
3 days refresher training of ANMs / LHVs at district level
including use of Tab MisoprostalRCH MH Per participant 2500 0.03 0 -
9.5.1.7 A.9.3.2.2 TOT for EmOC RCH MH 0.00 0.00
9.5.1.8 A.9.3.2.3 Training of Medical Officers in EmOC RCH MH 0.00 0.00
9.5.1.9 A.9.3.3.2 TOT for Anaesthesia skills training RCH MH 0.00 0.00
Training of Medical Officers in life saving Anaesthesia skills RCH MH 0.00
18 weeks LSAS training RCH MH Per participant 151500 1.52 0 -
Refresher of MO (2 weeks) RCH MH Per participant 25000 0.25 0 -
9.5.1.11 A.9.3.4.1 TOT on safe abortion services RCH MH 8/ batch 64000 0.64 0 0.00
Training of Medical Officers in safe abortion RCH MH 0.00
CAC certification Training of MBBS Doctors (2 Doctors for 12
days + 2 SNs for 6 days per batch) twelve working days at 13
CAC Training Venues. (Regioanal Level)
RCH MH per batch 66000 0.66 0 -
Referesher training (3 days) on CAC for already MTP Certified
Doctors / OG Spl along with SNs including MVA /EVA/MMA -
at 13 CAC Training Venues. (Regioanal Level)
RCH MH Per batch 32000 0.32 0 -
9.5.1.13 A.9.3.5.1 TOT for RTI/STI training RCH MH 0.00 0.00
9.5.1.14 A.9.3.5.2 Training of laboratory technicians in RTI/STI RCH MH 10/batch 46000 0.46 0 0.00
9.5.1.15 Training of ANM/staff nurses in RTI/STI RCH MH 0.00 0.00
9.5.1.16 A.9.3.5.3 Training of Medical Officers in RTI/STI RCH MH 25/batch 115000 1.15 0 0.00
9.5.1.17 A.9.3.6.1 TOT for BEmOC training RCH MH 0.00 0.00
9.5.1.18 A.9.3.6.2 BEmOC training for MOs/LMOs RCH MH Per Person 22500 0.23 0 0.00
9.5.1.6 A.9.3.1.3
9.5.1.10 A.9.3.3.3
9.5.1.12 A.9.3.4.2, A.1.1
Page 65 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
DAKSHTA training RCH MH 1.20
3 days District level Training of MCH/DHH & Facility level
service providers (LR & OG ward)RCH MH 15/batch 60210 0.60 2 1.20
1 day Data handlers Training on DAKSHATA for SN I/C & other
service providers at District levelRCH MH 15/batch 25000 0.25 -
1 day CME for ADMO(FW), DMRCH, Dakshata Coordinator at
State levelRCH MH 54 / Batch 201000 2.01 -
TOT for Dakshta RCH MH 0.00
5 days ToT of Coordinators/ Dy. Dakshata Coordinator (MOs) RCH MH 15/ batch 150000 1.50 0 -
5 days ToT for DP Mentors (Skill Based) at Regional level RCH MH 15/ batch 150000 1.50 0 -
Onsite Mentoring for DAKSHATA RCH MH 0.00
Baseline/periodic assessment RCH MH Per visit 2000 0.02 0 -
Mentoring & supportive visit RCH MH Per visit 2000 0.02 0 -
LaQshya trainings/workshops RCH MH 0.24
1 day orientation for Prog. Officers , Prog. Managers, on
"LaQshya Prgramme" at state levelRCH MH 40/ batch 108000 1.08 0 - Details in Annexure
2 days training for OG Spl ,Prog. Officers , Prog. Managers on
"LaQshya Prgramme" at MCH &District levelRCH MH 30/ batch 23800 0.24 1 0.24 Details in Annexure
Training of MOs/SNs RCH MH 0.84
One week confidence building on ultrasonography training for
OG spl. at 3 MCH & IGH, rourkelaRCH MH 2/ batch 32500 0.33 0 -
1 day state level Refresher training of Master Trainers on
Diagnosis & Management of Gestational Diabetes Mellitus for
OG Spl, MO , Paed. Spl, Endocrinologist, Dietician at Medical
Colleges. Batch Size-40/ batch.
RCH MH 40/batch 75000 0.75 0 -
3days Training of OGs, MOs & PMs (day 1 for PMs only. ) on
Diagnosis & Management of Gestational Diabetes Mellitus of
all DPs at district level.,
RCH MH 40/batch 84000 0.84 1 0.84
1 day state level TOT on Hypothyroidism during pregnancy for
Prof. and Asso. Prof. of 2 New MCH . RCH MH per person 2000 0.02 0 -
CS & Management of Basic complication for Surgery Spl.( 24
working days)RCH MH 2/batch 112000 1.12 0 -
1 day State level Refresher cum Review on Nearmiss review
(MNM-R) Training of Nodal Officers & Consultants , District
Nodal officers & Prog. Managers.
RCH MH 40/ batch 154000 1.54 0 -
2days Training of Health personnel on Trauma & Emergency
Medical Care at district levelRCH MH 30/batch 70135 0.70 0 -
To be met out of State Budget
9.5.1.24 Onsite mentoring at Delivery Points RCH MH 0.00 0.00
Other maternal health trainings (please specify) RCH MH 0.74
21 days SBA training of AYUSH Doctor at District level RCH MH Per Person 15000 0.15 0 -
9.5.1.19A.9.3.7.1.3
9.5.1.20
9.5.1.21
9.5.1.22
9.5.1.23
9.5.1.25 A.9.3.7
Page 66 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
3 days SBA refresher training of AYUSH Doctor at district level RCH MH Per Person 2500 0.03 -
7 days handson training on SBA for AYUSH Doctor of DPs RCH MH Per Person 9200 0.09 8 0.74
2 days training of AYUSH Doctor of DPs in NSSK at dist level RCH MH Per Person 1666 0.02 - Budget shifted to 9.5.28.6
District level training for MO , SN, LHV, ANM, O&G Splst etc.
for "Screenig for Syphilis during Pregnancy"RCH MH 50 / batch 60000 0.60 0 -
Target District: 30 , Status : Training in 10 dist/20 batches (
Cuttack, Ganjam, Gajapati, Jharsuguda, Khurda, Koraput,
Mayurbhanj, Rayagada, Sambalpur,Sundergarh) approved
during 2016-17 Training. rest 10 IMR & MMR dist ( Keonjhar,
Sonepur, Deogarh, Kalahandi, Nawarangpur, Malkanagir,
Kandhamal, Boudh, Nuapada, Bolangir approved in 2017-18)
So rest 12 District ( Angul, Balesore, Bhadrak, Dhenkanal,
Jajpur, Jagatsinghpur, Kendrapada, Puri, Nayagarh, Bargarh,
Mayurbhanj & Sundergarh)
Load for 2018-19: 1200 person (24 bathes @50/ batch)
9.5.2 Child Health Trainings 5.91
9.5.2.1 A.2.1
IMNCI (including F-IMNCI; primarily budget for planning for
pre-service IMNCI activities in medical colleges, nursing
colleges, and ANMTCs other training)
RCH CH 0.00 0.00
9.5.2.2 A.2.6Management of Diarrhoea & ARI & micronutrient
malnutrition (trainings only)RCH CH 0.00 0.00
9.5.2.3 A.2.7Micronutrient Supplementation Programme ( cost of activities
except cost of procurement of supplements) (trainings only)RCH CH 0.00 0.00
Child Death Review Trainings RCH CH 0.00
1 day state level refesher training cum review on MDSR &
CDR for investigators (AYUSH) @ 1 AYUSH per BlockRCH CH per person 4100 0.04 0 -
1 day state level orientatio on MDSR & CDR for accrediated
Pvt. Hospitals.RCH CH per person 2700 0.03 0 -
9.5.2.5 A.2.11.1
Provision for State & District level (Training and Workshops)
(Dissemination to be budgeted under IEC; Meetings/ review
meetings to be budgeted under PM)
RCH CH 0.00 0.00
9.5.2.6 A.9.5.1.1 TOT on IMNCI (pre-service and in-service) RCH CH 0.00 0.00
9.5.2.7 A.9.5.1.2 IMNCI Training for ANMs / LHVs RCH CH 0.00 0.00
9.5.2.8 A.9.5.2.1 TOT on F-IMNCI RCH CH 0.00 0.00
9.5.2.9 A.9.5.2.2 F-IMNCI Training for Medical Officers RCH CH 0.00 0.00
9.5.1.25 A.9.3.7
9.5.2.4 A.2.8
Page 67 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.2.10 A.9.5.2.3 F-IMNCI Training for Staff Nurses RCH CH Per Person 20600 0.21 0 0.00
Training on facility based management of Severe Acute
Malnutrition (including refreshers)RCH CH 0.00
One day refresher training at state level on strengthening
NRCs for ADMO(M)/ SDMO/MO I/c , HM/Jr. HM /BPM of
Concerned NRC (50 existing NRC) 2 person from each NRC
RCH CH Per Person 2400 0.02 0 -
Three days hands-on training of 1 Nutrition Counsellor, 4
ANMs at better performing NRCs For 19 new proposed NRCs RCH CH Per Person 5000 0.05 0 -
9.5.2.12 A.9.5.5.1.1 TOT for NSSK RCH CH 0.00 0.00
9.5.2.13 A.9.5.5.1.2 NSSK Training for Medical Officers RCH CH 16/ batch 61000 0.61 0 0.00
NSSK Training for SNs RCH CH 0.40
NSSK Training for SNs & ANMs RCH CH 16/batch 26700 0.27 1 0.27
One day Refresher training SNs RCH CH Per Person 850 0.01 16 0.14
9.5.2.15 A.9.5.5.1.4 NSSK Training for ANMs RCH CH Per person 850 0.01 0 0.00
9.5.2.16 A.9.5.5.2.a 4 days Training for facility based newborn care RCH CH per person 9500 0.10 0 0.00
9.5.2.17 A.9.5.5.2.b 2 weeks observership for facility based newborn care RCH CH 6/ batch 210000 2.10 0 0.00
4 days Trainings on IYCF for MOs, SNs, ANMs of all DPs and
SCs (ToT, 4 days IYCF Trainings & 1 day Sensitisation on MAA
Program)
RCH CH 2.26
4 days Trainings on IYCF for MOs, SNs, ANMs of all DPs and
SCsRCH CH Per Batch 113000 1.13 2 2.26
Orientation of ASHA on MAA to promot IYCF counselling at
existing platform( Sector meeting )RCH CH Per ASHA 50 0.00 0.00
Budget not Approved.
As per MAA guidelines orientation of ASHA on IYCF should be
carried out I regular monthly sector meetings. Provision of
separate budget is not approved for this activity
9.5.2.19 A.9.5.5.2.d Orientation on National Deworming Day RCH CHPer
participants100 0.00 3244 3.24
9.5.2.20 TOT (MO, SN) for Family participatory care (KMC) RCH CH 0.00 0.00 Not proposed.
9.5.2.21 Trainings for Family participatory care (KMC) RCH CH 0.00 0.00 Not proposed.
9.5.2.22New Born Stabilization training Package for Medical Officers
and Staff nursesRCH CH 0.00 0.00
Other Child Health trainings (please specify) RCH CH 0.00
4 days Training for facility based newborn care RCH CH per person 9500 0.10 0 -
2 weeks observership for facility based newborn care RCH CH 6/ batch 210000 2.10 0 -
4 days District level Training on MAA for DP point Service
providers (Doctor ,Staff Nuse , ANM & RMNCH counsellors
posted at DPs in functional 580 DP)
RCH CH 30 / batch 113000 1.13 - Budget shifted to Line no. 9.5.2.18
Orientation of ASHA on MAA to promot IYCF counselling at
existing platform( Sector meeting )RCH CH per person 50 0.00 - Budget shifted to Line no. 9.5.2.18
One day sensitization ANM/ Nurses/ Doctors of Non-DPs and
SCs at District level for MAA programmeRCH CH - -
9.5.2.11 A.9.5.4.1
9.5.2.14 A.9.5.5.1.3
9.5.2.18 A.9.5.5.2.c
9.5.2.23Page 68 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Two days Refresher training of Cold Chain Technicians on
maintenance of SNCU equipments at state level.RCH CH 15 / batch 95000 0.95 0 -
2 days orientation cum training of Mos on Paediatric
Intensive Care Unit (PICU) at state levelRCH CH 20 / batch 108000 1.08 0 -
2 days orientation cum training of SNs on Paediatric Intensive
Care Unit (PICU) at state levelRCH CH 20 / batch 108000 1.08 0 -
3 Months hands on training of service providers of PICU (@ 2
MOs & 4 SNs/ batch) at SVPPGIP, CuttackRCH CH 6 / batch 768150 7.68 0 -
2 days point of care Quality Imrovement Training of MO & SN
of 10 high case SNCUs at state levelRCH CH 25/ batch 75000 0.75 0 -
One day district level orientation training of ASHA Sathi for
strengthening implementation of HBNC, and follow up of LBW
&SNCU discharge cases a
RCH CH 35/ batch 26000 0.26 0 -
HBYC Training of ASHA, AWW & ANM RCH CH 30/per batch 117300 1.17 0 - Budget Not Approved
9.5.3 Family Planning Trainings 15.58
9.5.3.1 A.3.2.6
Orientation/review of ANM/AWW (as applicable) for New
schemes, FP-LMIS, new contraceptives, Post partum and post
abortion Family Planning, Scheme for home delivery of
contraceptives (HDC), Ensuring spacing at birth (ESB
{wherever applicable}), Pregnancy Testing Kits (PTK)
RCH FP 0.00 0.00
Review/orientation proposed under following heads
> Orientation of ANMs on newer schemes is budgeted in line
item 9.5.3.24
> Orientation of ANMs on FP LMIS is budgeted in line item
9.5.3.26
> Orientation of ANMs on Post partum and post abortion
Family Planning is budgeted in line item 9.5.3.19
> Orientation of ANMs and AWW is already completed on
HDC, ESB and PTK so not budgeted in 2018-19
>Orientation of AWW on newer schemes and post
abortion/partum family planning schemes will be done in
regular sector level meetings and no separate funds are
required for the same.
9.5.3.2 A.3.2.7 Dissemination of FP manuals and guidelines (workshops only) RCH FP 0.00 0.00
9.5.3.3 A.9.6.1.1 TOT on laparoscopic sterilization RCH FP 0.00 0.00
9.5.3.4 A.9.6.1.2Laparoscopic sterilization training for doctors (teams of
doctor, SN and OT assistant)RCH FP 3 / batch 57500 0.58 0 0.00
9.5.3.5 A.9.6.1.3 Refresher training on laparoscopic sterilization RCH FP 0.00 0.00
9.5.3.6 A.9.6.2.1 TOT on Minilap RCH FP 4 / batch 65000 0.65 0 0.00
9.5.3.7 A.9.6.2.2 Minilap training for medical officers RCH FP 3 / batch 55000 0.55 1 0.55
9.5.3.8 A.9.6.2.3 Refresher training on Minilap sterilization RCH FP 0.00 0.00
TOT on NSV RCH FP 0.65
5 days State Level TOT MOs on NSV RCH FP Per Batch 65000 0.65 0 0.00
5 days NSV training of Mos at Dist. Level RCH FP Per Batch 32600 0.33 2 0.65
9.5.3.10 A.9.6.3.3 Refresher training on NSV sterilization RCH FP 0.00 0.00
9.5.3.11 A.9.6.4.1 TOT (IUCD insertion training) RCH FP 0.00 0.00
9.5.2.23
9.5.3.9 A.9.6.3.1
Page 69 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.3.12 A.9.6.4.2 Training of Medical officers (IUCD insertion training) RCH FP 10 / batch 78000 0.78 1 0.78
9.5.3.13 A.9.6.4.3 Training of AYUSH doctors (IUCD insertion training) RCH FP 10 / batch 61000 0.61 1 0.61
Training of Nurses (Staff Nurse/LHV/ANM) (IUCD insertion
training)RCH FP 2.08
5 days Training of staff nurses on IUCD RCH FP 10 / batch 61000 0.61 1 0.61
5 days Training of ANMs / LHVs on IUCD RCH FP 10 / batch 49000 0.49 3 1.47
9.5.3.15 A.9.6.5.1 TOT (PPIUCD insertion training) RCH FP 0.00 0.00
9.5.3.16 A.9.6.5.2 Training of Medical officers (PPIUCD insertion training) RCH FP 10 / batch 40000 0.40 1 0.40
9.5.3.17 A.9.6.5.3 Training of AYUSH doctors (PPIUCD insertion training) RCH FP 0.00 0.00
9.5.3.18 A.9.6.5.4Training of Nurses (Staff Nurse/LHV/ANM) (PPIUCD insertion
training)RCH FP 0.00 0.00 Budget proposed under 9.5.3.16
9.5.3.19 A.9.6.6.1 Training for Post abortion Family Planning RCH FP 30/batch 30000 0.30 1 0.30
9.5.3.20 A.9.6.7 Training of RMNCH+A/ FP Counsellors RCH FP 0.00 0.00
9.5.3.21 A.9.6.9.1 TOT (Injectible Contraceptive Trainings) RCH FP 0.00 0.00
9.5.3.22 A.9.6.9.2Training of Medical officers (Injectible Contraceptive
Trainings)RCH FP 30/batch 63500 0.64 2 1.27
9.5.3.23 A.9.6.9.3 Training of AYUSH doctors (Injectible Contraceptive Trainings) RCH FP 30/ batch 27000 0.27 1 0.27
9.5.3.24 A.9.6.9.4Training of Nurses (Staff Nurse/LHV/ANM) (Injectible
Contraceptive Trainings)RCH FP 30/ batch 27000 0.27 5 1.35
9.5.3.25 A.9.6.10 Oral Pills Training RCH FP 30/batch 27000 0.27 8 2.16
9.5.3.26 FP-LMIS training RCH FP 35/ batch 32235 0.32 16 5.16
9.5.3.27 Other Family Planning trainings (please specify) RCH FP 0.00 0.00
9.5.4 Adolescent Health Trainings 0.00
9.5.4.1 A.4.1.1 Dissemination workshops under RKSK RCH AH 0.00 0.00
9.5.4.2 A.9.7.1.1 TOT for Adolescent Friendly Health Service training RCH AH 0.00
9.5.4.3 A.9.7.1.2 AFHS training of Medical Officers RCH AH 35/ batch 261000 2.61 0 0.00
9.5.4.4 A.9.7.1.3 AFHS training of ANM/LHV/MPW RCH AH 0.00
9.5.4.5 A.9.7.1.5 Training of AH counsellors RCH AH 0.00 0.00
9.5.4.6 A.9.7.2.1 Training of Peer Educator (District level) RCH AH 0.00 0.00
9.5.4.7 A.9.7.2.2 Training of Peer Educator (Block Level) RCH AH 40/batch 70000 0.70 0 0.00
9.5.4.8 A.9.7.2.3 Training of Peer Educator (Sub block level) RCH AH 0.00 0.00
9.5.4.9 A.9.7.3.1 WIFS trainings (District) RCH AH 0.00 0.00
9.5.4.10 A.9.7.3.2 WIFS trainings (Block) RCH AH 0.00 0.00
9.5.4.11 A.9.7.4.1 MHS Trainings (District) RCH AH 0.00 0.00
9.5.4.12 A.9.7.4.2 MHS Trainings (Block) RCH AH 0.00 0.00
9.5.4.13 A.9.12.6 Intensification of School Health Activities RCH AH 0.00
9.5.4.13.a A.9.12.6.1 Training of master trainers at district and block level RCH AH 0.00 0.00
9.5.4.13.b A.9.12.6.2 Training of two nodal teachers per school RCH AH 0.00 0.00
9.5.4.13.c Any other (please specify) RCH AH Lumpsum 7000000 70.00 0 0.00
9.5.4.14 A.9.7.5 Other Adolescent Health trainings (please specify) RCH AH 0.00 0.00
9.5.5 RBSK Trainings 0.00
9.5.3.14 A.9.6.4.4
Page 70 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.5.1 A.9.12.1RBSK Training -Training of Mobile health team – technical and
managerial (5 days)RCH RBSK 30/batch 182975 1.83 0 0.00
RBSK DEIC Staff training (15 days) RCH RBSK 0.00
DEIC training : 6 running DEIC + 24 proposed DEIC X 14
persons per DEIC.RCH RBSK Per person 30354 0.30 0 -
Training of Ophth. Surg. on ROP (Two Months) RCH RBSK Per inst 128530 1.29 0 -
Mentoring support by AIIMS, MCH & Thematic experts in the
field of Early InterventionRCH RBSK Per DEIC 50000 0.50 0 -
One day state level CME for dist. programme managers on
RBSK RCH RBSK Per person 3000 0.03 0 -
Exposure visit of DEIC Staff & Nodal Officers to Early
Intervention centers such as DEIC at IPGME&R and other
specialized institutions having best practices on early
intervention .
RCH RBSK Per person 30000 0.30 0 -
9.5.5.3 A.9.12.3One day orientation for MO / other staff Delivery points
(RBSK trainings)RCH RBSK 30/batch 36000 0.36 0 0.00
9.5.5.4 A.9.12.4Training/Refresher training -M.O & SN/ ANM of FRU on New
Born Screening (RBSK trainings)RCH RBSK 0.00 0.00
9.5.5.5 Other RBSK trainings (please specify) RCH RBSK 0.00 0.00
9.5.6 Trainings for Blood Services & disorders 0.00
9.5.6.1 A.9.3.8 Blood Bank/Blood Storage Unit (BSU) Training RCH Blood Services 30/batch 174000 1.74 0 0.00
9.5.6.2 A.9.3.8 Training for Haemoglobinopathies RCH Blood Services 0.00 0.00
9.5.6.3 Any other trainings (please specify) RCH Blood Services 0.00 0.00
9.5.7 Trainings under NPPCD 0.00
9.5.7.1 B.25.2.1.b Trainings at District Hospital @Rs.20 lakh/ Dist.. HSS NPPCD 20/batch 262000 2.62 0 0.00
9.5.7.2 B.25.2.1.c Trainings at CHC/Sub-Divisional Hospital @Rs.50,000/- Kit HSS NPPCD 0.00 0.00
9.5.7.3 B.25.2.1.d Trainings at [email protected],000/- kit HSS NPPCD 0.00 0.00
9.5.7.4 Any other (please specify) HSS NPPCD Per CME 0.00 0.00 Budget Not Approved.
9.5.8 Trainings under NPPC 0.00
9.5.8.1 B.27.1.2Training of PHC Medical Officers, nurses, Paramedical
Workers & Other Health Staff under NPPCHSS NPPC 0.00 0.00
9.5.8.2 Any other (please specify) HSS NPPC 0.00 0.00
9.5.9 Trainings under NPPCF 0.00
Training of medical and paramedical personnel at district
level under NPPCFHSS NPPCF 0.00
Training of Medical Officer at State level HSS NPPCF 30/ batch 52000 0.52 0 0.00
Training of Paramedical Personnel at District level HSS NPPCF 30/ batch 25000 0.25 0 0.00
9.5.9.2 Any other (please specify) HSS NPPCF 0.00 0.00
9.5.10 Trainings under Routine Immunisation 9.90
Training under Immunisation RCH RI 8.05
9.5.5.2 A.9.12.2
9.5.9.1 B.29.1.4
9.5.10.1 C.3Page 71 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Two days district level Orientation/ refresher training for
service providers on RI & new vaccine (Participants : Health
Worker (M/F), Multi Purpose Health Worker (M/F) &
supervisors
RCH RI 20/ batch 47900 0.48 2 0.96
Three days training of Medical Officers on RI & new vaccine
(Particpants : Block MO I/c, AYUSH MO)RCH RI 20/ batch 83600 0.84 0 -
Two days district level cold chain handlers training RCH RI 20/ batch 47900 0.48 2 0.96
One day ICA training at state level RCH RI Per batch 106000 1.06 0 -
BRIDGE IPC skills training for FLWs RCH RI 35/ batch 18600 0.19 33 6.14
Any other (please specify) RCH RI 1.84
Training under eVIN RCH RI 1.84
Two days training on Vaccine Logistics & Order management
for ADMO(FW), RVCCM, DVLM at State level RCH RI Per Batch 183500 1.84 0 0.00
One day State level Cold Chain Management Training on eVIN RCH RI Per Batch 133500 1.34 0 0.00
One day State level Refresher on eVIN and Temperature
Logger RCH RI Per Batch 83500 0.84 0 0.00
Two days training on Order management for Cold Chain
Handlers at district levelRCH RI 40/Per Batch 92200 0.92 2 1.84
9.5.11 Trainings under IDSP 0.80
9.5.11.1 E.2.1 Medical Officers (1 day) CD IDSP Per Batch 30000 0.30 1 0.30
9.5.11.2 E.2.2 Medical College Doctors (1 day) CD IDSP Per Batch 30000 0.30 0 0.00
9.5.11.3 E.2.3 Hospital Pharmacists/Nurses Training (1 day) CD IDSP Per Batch 25000 0.25 1 0.25
9.5.11.4 E.2.4 Lab. Technician (3 days) CD IDSP Per Batch 115000 1.15 0 0.00
9.5.11.5 E.2.5 Data Managers (2days) CD IDSP Per Batch 70000 0.70 0 0.00
9.5.11.6 E.2.6 Data Entry Operators cum Accountant (2 days) CD IDSP Per Batch 70000 0.70 0 0.00
9.5.11.7 E.2.7 ASHA & MPWs, AWW & Community volunteers (1 day) CD IDSP Per Batch 0.00 0.00
9.5.11.8 E.2.8One day training for Data entry and analysis for Block Health
Team (including Block Programme Manager)CD IDSP Per Batch 25000 0.25 1 0.25
9.5.11.9 E.2.10 Any other (please specify) CD IDSP Lumpsum 300000 3.00 0 0.00
9.5.12 Trainings under NVBDCP 0.50
9.5.12.1 F.1.1.f Training / Capacity Building (Malaria) CD NVBDCP Lumpsum 980000 9.80 0 0.00
9.5.12.2 F.1.2.h Training / Workshop (Dengue and Chikungunya) CD NVBDCP Lumpsum 400000 4.00 0 0.00
9.5.12.3 F.1.3.b Capacity Building (AES/ JE) CD NVBDCP Lumpsum 200000 2.00 0 0.00
9.5.12.4 F.1.3.c Training specific for JE prevention and management CD NVBDCP Per Batch 25000 0.25 0 0.00
9.5.12.5 F.1.3.l Other Charges for Training /Workshop Meeting (AES/ JE) CD NVBDCP Lumpsum 500000 5.00 0 0.00
9.5.12.6 F.1.4.dTraining/sensitization of district level officers on ELF and drug
distributors including peripheral health workers (AES/ JE)CD NVBDCP Per Dist 50000 0.50 1 0.50
9.5.12.7 Any other (please specify) CD NVBDCP 0.00 0.00
9.5.13 Trainings under NLEP 0.00
9.5.13.1 G.3.1 Capacity building under NLEP CD NLEP Per Batch 205000 2.05 0 0.00
9.5.10.1 C.3
9.5.10.2
Page 72 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.13.2 Any other (please specify) CD NLEP Per Batch 135000 1.35 0 0.00
9.5.14 Trainings under RNTCP 6.32
Trainings under RNTCP CD RNTCP 6.32
State Level Training (Initial) CD RNTCP 0.00
ToT of MOs in Revised PMDT, Delamanid & Bedaquiline CD RNTCP 20/batch 200000 2.00 0 0.00 Implementing Agency- ATD & TC, CTC
Training of LTs of DMCs- ZN Initial (Comprehensive) Govt.+
Non Govt.CD RNTCP 20/batch 321000 3.21 0 0.00 Implementing Agency- ATD & TC, CTC
Training of STLs on LED FM CD RNTCP 20/batch 35000 0.35 0 0.00 Implementing Agency- ATD & TC, CTC
CBNAAT Training of LTs & STLSs CD RNTCP 20/batch 61000 0.61 0 0.00 Implementing Agency- ATD & TC, CTC
Training of STS - Initial (Comprehensive) CD RNTCP 20/batch 269000 2.69 0 0.00 Implementing Agency- ATD & TC, CTC
Revised PMDT trainings (District DRTB & TBHIV Coordinator CD RNTCP 20/batch 150000 1.50 0 0.00 Implementing Agency- ATD & TC, CTC
Initial Training of TBHV CD RNTCP 20/batch 87000 0.87 0 0.00 Implementing Agency- ATD & TC, CTC
State Level Training (Re-Training) 0.00
Re-Training of STLS CD RNTCP 20/batch 87000 0.87 0 0.00 Implementing Agency- ATD & TC, CTC
Re-Training of LT CD RNTCP 20/batch 87000 0.87 0 0.00 Implementing Agency- ATD & TC, CTC
State Level Training (Other training) CD RNTCP 0.00 0.00
Training of District Programme Coordinator & Accountants on
PIP Dessemination & Financial Management CD RNTCP 35/ batch 140000 1.40 0 0.00 Implementing agency: State TB Cell
Training of Capacity building workshop on Data Management
(NIKSHAY/ DVDMS/ Dist. Performance)CD RNTCP 35/ batch 140000 1.40 0 0.00 Implementing agency: State TB Cell
District Level Training (Initial) CD RNTCP 0.00 4.64
Training of MOs Revised PMDT, Delamanid & Bedaquiline CD RNTCP 30/batch 54000 0.54 3 1.62 Implementing agency: DTC
Training of MPWs, MPHS, pharmacists, nursing staff, BEO etc CD RNTCP 30/batch 50000 0.50 3 1.50 Implementing agency: DTC
Training of Community Volunteers CD RNTCP 30/batch 34000 0.34 3 1.02 Implementing agency: DTC
Training of Pvt Practitioners/ Laboratories CD RNTCP 20/ batch 30000 0.30 0 0.00 Implementing agency: DTC
Training of LTs of DMCs (Revised PMDT / Bedaquiline/
Delaminite) Govt. + Non Govt.CD RNTCP 30/batch 50000 0.50 1 0.50 Implementing agency: DTC
Training of STS / TBHVs (Revised PMDT / Bedaquiline/
Delaminid) CD RNTCP 30/batch 50000 0.50 0 0.00 Implementing agency: DTC
District Level Training (Other) CD RNTCP 0.00 1.68
AYUSH / School health / NRHM contractual doctors training CD RNTCP 30/batch 32000 0.32 1 0.32 Implementing agency: DTC
DVDMS Training to Block Pharmacies CD RNTCP 30/batch 32000 0.32 1 0.32 Implementing agency: DTC
Quarterly Performance Monitoring 4nos./TU CD RNTCP 30/batch 26000 0.26 4 1.04 Implementing agency: DTC
CME (Medical Colleges) CD RNTCP 0.00
Sensitization of Faculty Members of Medical colleges CD RNTCP Per Batch 32000 0.32 0 0.00
Sensitization of Residents & Interns on RNTCP CD RNTCP Per Batch 32000 0.32 0 0.00
9.5.14.3 Any other (please specify) CD RNTCP 0.00 0.00
9.5.15 Trainings under NPCB 0.00
9.5.15.1 I.1.6 Training of PMOA under NPCB NCD NPCB 0.00 0.00
9.5.14.1 H.6
9.5.14.2 H.10
Page 73 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.15.2 Any other (please specify) NCD NPCB 0.00 0.00
9.5.16 Trainings under NMHP 2.61
Training of PHC Medical Officers, Nurses, Paramedical
Workers & Other Health Staff working under NMHPNCD NMHP 2.61
3 days residential training MOs (State Level)/ AYUSH Batches
(district level) NCD NMHP 30/Per Batch 88000 0.88 1 0.88
State ToT for Medical Officers/ District Nodal Officer NCD NMHP 30/Per Batch 180000 1.80 0 0.00
1 day Training of SN, Pharm., HW (M&F) NCD NMHP 30/Per Batch 28845 0.29 6 1.73
2 days ToT for SN, Pharm., HW (M&F) NCD NMHP 30/Per Batch 75000 0.75 0 0.00
7 days residental training of (Clinical Psy. & PSW) NCD NMHP 30/Per Batch 309000 3.09 0 0.00
9.5.16.2 Any other (please specify) NCD NMHP 0.00 0.00
9.5.17 Trainings under NPHCE 0.00
9.5.17.1 K.1.1.2Training of doctors and staff from CHCs and PHCs under
NPHCENCD NPHCE Per batch 73000 0.73 0 0.00
9.5.17.2 K.1.2.1 Training per CHC under NPHCE NCD NPHCE 0.00 0.00
9.5.17.3 K.1.3.1.Training per PHC under NPHCE (IEC to be budgeted under
B.10.6)NCD NPHCE Per Batch 78000 0.78 0 0.00
9.5.17.4 Any other (please specify) NCD NPHCE Per ANM 0.00 0.00 Not Approved
9.5.18 Trainings under NTCP 0.50
9.5.18.1 M.1.1 Trainings for District Tobacco Control Centre 0.50
9.5.18.1.a M.1.1.1 Orientation of Stakeholder organizations NCD NTCP Per Batch 0.00 0.00
9.5.18.1.b M.1.1.2 Training of Health Professionals NCD NTCP Per Batch 205000 2.05 0 0.00
9.5.18.1.c M.1.1.3 Orientation of Law Enforcers NCD NTCP Per Batch 50000 0.50 1 0.50
9.5.18.1.d M.1.1.5Other Trainings/Orientations - sessions incorporated in
other's trainingNCD NTCP Per Batch 77000 0.77 0 0.00
9.5.18.2 M.3.1 Trainings for State Tobacco Control Centre 0.00
9.5.18.2.a M.3.1.1 State Level Advocacy Workshop NCD NTCP Lumpsum 200000 2.00 0 0.00
9.5.18.2.b M.3.1.2 Training of Trainers, Refresher Trainings NCD NTCP Per Batch 0.00 0.00
9.5.18.2.c M.3.1.3 Training on tobacco cessation for Health care providers NCD NTCP 0.00 0.00
9.5.18.2.d M.3.1.4 Law enforcers training / sensitization Programme NCD NTCP Per Batch 0.00 0.00
9.5.18.2.e M.3.1.5Any other training to facilitate implementation of provisions
of COTPA 2003, FSSA 2006, and WHO FCTC implementationNCD NTCP 0.00 0.00
9.5.19 O.2.3 Trainings under NPCDCS 0.00
State NCD Cell NCD NPCDCS 0.00
Refreshers training of MOs on NPCDCS @ 2 MOs from DHH,
1 MO fromCHC/ SDHNCD NPCDCS Per Batch 198120 1.98 0 0.00
Refreshers training of Staff Nurse on NPCDCS @1 per
InstitutionNCD NPCDCS Per Batch 124905 1.25 0 0.00
9.5.16.1 J.1.2
9.5.19.1 O.2.3.1
Page 74 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Refreshers training of Counsellors on NPCDCS @ 1 per
InstitutionNCD NPCDCS Per Batch 124905 1.25 0 0.00
Training of NPCDCS Programme Managers NCD NPCDCS Per Batch 213000 2.13 0 0.00
9.5.19.2 O.2.3.2 District NCD Cell NCD NPCDCS 0.00 0.00
9.5.19.3 Training for Universal Screening for NCDs HSS HSS/NPCDCS 0.00 0.00 To be met out of committed unspent balance
Any other (please specify) NCD NPCDCS 0.00
Training / orientation of Doctors & paramedics NCD NPCDCS Per Batch 28350 0.28 0 0.00
ICU Training for MOs, Staff Nurse, Pharmacists & LT NCD NPCDCS Per Batch 1712000 17.12 0 0.00
9.5.20 PMU Trainings 0.00
9.5.20.1 A.9.8.1 Training of SPMSU staff 0.00
Training on Finance RCH HSS 0.00
A.9.8.1.2.2Management development programme at reputed
institutionsRCH HSS per person 50000 0.50 0 -
A.9.8.1.32 day Financial Management training cum - Review of finance
personnel from State & dist at State levelRCH HSS 40/ batch 113520 1.14 0 -
9.5.20.1.b Training on HR RCH HSS 0.00 0.00
Any other (please specify) RCH HSS 0.00
PG Diploma in Pubilc Health Mgt. (1 yr e-course including 7
contact sessions) RCH HSS per person 40000 0.40 0 -
A.9.8.1.2.1Management development programme at reputed
institutions for Programme Officers RCH HSS per person 50000 0.50 0 -
A.9.8.1.2.3Management development programme at reputed
institutions for MIS Officers RCH HSS per person 50000 0.50 0 -
9.5.20.2 A.9.8.2 Training of DPMSU staff 0.00
Training on Finance RCH HSS 0.00
A.9.8.2.2.2Management development programme at reputed
institutionsRCH HSS per person 40000 0.40 0 -
A.9.8.2.3
1 day Financial Management training cum - Review on
financial Management of finance personnel from DHH, SDH,
Block CHC at District level.
RCH HSS per person 818 0.01 0 -
9.5.20.2.b Training on HR RCH HSS 0.00 0.00
Any other (please specify) RCH HSS 0.00
A.9.8.2.1PG Diploma in Public Health Mgt. (1 yr e-course including
contact sessions) at NIHFW, New DelhiRCH HSS per person 30000 0.30 0 -
A.9.8.2.2.1Management development programme at reputed
institutions for Programme Officers RCH HSS per person 40000 0.40 0 -
A.9.8.2.2.3Management development programme at reputed
institutions for MIS Officers RCH HSS per person 40000 0.40 0 -
Five Days Induction Training of Newly appointed DPMU staff (
Batch Size-30 person/ batch) at state levelRCH HSS per person 7500 0.08 0 -
9.5.20.3 A.9.8.3 Training of BPMSU staff 0.00
9.5.20.3.a Training on Finance RCH HSS per person 40000 0.40 0 0.00
9.5.20.3.b Training on HR RCH HSS 0.00 0.00
Any other (please specify) RCH HSS 0.00
9.5.19.1 O.2.3.1
9.5.19.4
9.5.20.1.a
9.5.20.1.c
9.5.20.2.a
9.5.20.2.c
9.5.20.3.cPage 75 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
A.9.8.3.1PG Diploma in Public Health Mgt. (1 yr e-course including
contact sessions) at NIHFW, New DelhiRCH HSS per person 30000 0.30 0 -
A.9.8.3.2.1Management development programme at reputed
institutions for Programme Officers RCH HSS per person 40000 0.40 0 -
A.9.8.3.2.3Management development programme at reputed
institutions for MIS Officers RCH HSS per person 40000 0.40 0 -
A.9.8.3.3 Three Days Induction Training of newly appointed BPMU staff RCH HSS 30/ batch 180000 1.80 0 -
A.9.8.3.4 Three Days Refresher Training for BPMU staff RCH HSS 30/ batch 180000 1.80 0 -
9.5.21 PNDT Trainings 0.00
A.9.9.1 PC/PNDT training RCH PNDT 0.00
PC/PNDT training - State Level Trainings RCH PNDT
Symposium of DAAs, District Judges and Prosecutors on PC
PNDT Case Analysis at OJA RCH PNDT 100/ batch 5000 0.05 0 -
Training of State Inspection and Monitoring Team (3 batches) RCH PNDT 40 / batch 50000 0.50 0 -
Training of Distict Inspection and Monitoring Team at
Regional level (3 batches) RCH PNDT 40 / batch 40000 0.40 0 -
A.9.9.1.1State level training of District Nodal Officers on strengthening
implementation of PCPNDT Act RCH PNDT 30/ batch 50000 0.50 0 -
A.9.9.1.6
1 day Training Prosecuting Officesr of cognizance taking court
on PCPNDT Act in collaboration with Directors of Public
Prosecution (2 baches)
RCH PNDT 40/batch 100000 1.00 - Budget Not Approved
2 days Training on Reporting mechanism and Maintenance of
Records ( 2 times a year) RCH PNDT 30/ batch 75000 0.75 - Budget Not Approved
A.9.9.1.2
One day sensitisation training of Medical College students
and faculties at AIIMS for Medical College students of AIIMS ,
KIMS, Hi - Tech and SUM
RCH PNDT 150/batch 50000 0.50 0 -
One day State Level Training of District Advisory Committee
Members of all 30 districts (3 batches)RCH PNDT 40 / batch 75000 0.75 - Budget Not Approved
PC PNDT - District level trainings RCH PNDT
Stakeholders’ Training on Strengthening Implementation of
PC PNDT Act –( 1 each in a District, 2 each in Ganjam,
Mayurbhanj and Sundargarh = 33 batches ) @ Rs. 45,000/-
per batch
RCH PNDT 40 / batch 45000 0.45 - Budget Not Approved
District Level sensitization programme with PRI Members ( 1
each in a District, 2 each in Ganjam, Mayurbhanj and
Sundargarh = 33 batches ) @ Rs. 45,000/- per batch
RCH PNDT 35 / batch 45000 0.45 - Budget Not Approved
District Level programme with para – legal Volunteers and
Bharat Nirman Volunteers ( 1 each in a District, 2 each in
Ganjam, Mayurbhanj and Sundargarh = 33 batches ) @ Rs.
30,000/- per batch
RCH PNDT 35 / batch 30000 0.30 - Budget Not Approved
9.5.21.2 Any other (please specify) RCH PNDT 0.00 0.00
9.5.22 ASHA facilitator/ARC trainings 0.00
9.5.22.1 B1.1.1.5.2 Training of District trainers HSS NHSRC-CP 0.00 0.00
9.5.20.3.c
9.5.21.1
Page 76 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.22.2 Capacity Building of ASHA Resource Centre 0.00
9.5.22.2.a B1.1.6.1 HR at State Level (PM HR only) HSS NHSRC-CP 0.00 0.00
9.5.22.2.b B1.1.6.2 HR at District Level (PM HR only) HSS NHSRC-CP 0.00 0.00
9.5.22.2.c B1.1.6.3 HR at Block Level (PM HR only) HSS NHSRC-CP 0.00 0.00
9.5.22.3 Any other (please specify) HSS NHSRC-CP 0.00 0.00
9.5.23 Trainings on Outreach Services 0.00
9.5.23.1 B11.1.4 Training/orientation (MMU) HSS HSS 0.00 0.00
9.5.23.2 B11.2.3 Training/orientation (MMV) HSS HSS 0.00 0.00
9.5.23.3 B12.2.6 Training/orientation (Ambulance) HSS HSS 0.00 0.00
9.5.23.4 Any other (please specify) HSS HSS 0.00 0.00
9.5.24 Trainings under AYUSH 0.00
B9.2 Training under AYUSH HSS HSS/AYUSH 0.00
A.9.8.4.1.16days Induction Training of Govt Regular AYUSH
doctors(AMO/HMO) at standalone Dispensary.HSS HSS/AYUSH Per person 9000 0.09 0 0.00
A.9.8.4.1.2Management Development Training for AYUSH Officials/
Managers (State & Dist) at reputed Institutions HSS HSS/AYUSH Per person 50000 0.50 0 0.00
A.9.8.4.1.3
6 days clinical skill development & refresher training for
AYUSH Doctors working in colocated units under NHM at
AYUSH Govt Medical Colleges (BBSR & PURI)
HSS HSS/AYUSH Per block 351000 3.51 0 0.00
A.9.8.4.1.4
1 day Training of Regular AYUSH (AMO, HMO) on IDSP
Involment of Regular Ayush doctors in the National health
program.
HSS HSS/AYUSH 30/ batch 75000 0.75 0 0.00
Training on updation of recent advances in Homeopathy &
Ayurvedic system for Faculties of AYUSH Medical college in
National Institute of Homeopathy, Kolkotta & National
Institute of Ayuvedic, Jaipur
HSS HSS/AYUSH Per person 40000 0.40 0 0.00
9.5.24.2 Any other (please specify) HSS HSS/AYUSH 0.00 0.00
9.5.25 Quality Assurance Trainings 0.80
Quality Assurance Training (including training for internal
assessors at State and District levels)HSS HSS/NHSRC 0.00
State level Refresher Training on Quality Assurance (2Days) HSS HSS/NHSRC 40/batch 104000 1.04 0 -
Orientation Training for Internal Assessors (2 Days) HSS HSS/NHSRC 40/batch 266000 2.66 0 -
9.5.25.2 B15.2.6 Miscellaneous Activities under QA (Quality Course) HSS HSS/NHSRC Lumpsum 2940750 29.41 0 0.00
9.5.25.3 B15.2.7.1 Kayakalp Trainings HSS HSS/NHSRC Lumpsum 80000 0.80 1 0.80
9.5.25.4 Any other (please specify) HSS HSS/NHSRC Per Training 15000 0.15 0.00 Budget Not Approved
9.5.26 HMIS/MCTS Trainings 3.37
9.5.26.1 B15.3.1.4.1 Training cum review meeting for HMIS & MCTS at State level HSS HMIS/ MCTS Lumpsum 2665000 26.65 0 0.00
9.5.26.2 B15.3.1.4.2Training cum review meeting for HMIS & MCTS at District
levelHSS HMIS/ MCTS Per block 6000 0.06 12 0.72
9.5.24.1
9.5.25.1 B15.2.3
Page 77 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
9.5.26.3 B15.3.1.4.3 Training cum review meeting for HMIS & MCTS at Block level HSS HMIS/ MCTS Per person 500 0.01 529 2.65
9.5.26.4 Any other (please specify) HSS HMIS/ MCTS 0.00 0.00
9.5.27 Trainings for Health & Wellness centre (H&WC) 30.15
9.5.27.1 B18.3 Bridge Course/ training on the Standard Treatment Protocols HSS HSS Per inst. 130000 1.30 8 10.40
9.5.27.2 B18.3 Multi-skilling of ANMs, ASHA, MPW HSS HSS Per inst. 20000 0.20 41 8.20
9.5.27.3 B3.4 BSc Community Health/ Bridge Course for MLPs for CPHC HSS HSS
9.5.27.4 Any other (please specify) HSS HSS Per inst. 35000 0.35 33 11.55
9.5.28 Any Other Trainings 0.32
9.5.28.1 A.9.11.3.1 PGDHM Courses RCH HSS 0.00 0.00
9.5.28.2 B6.3 Training (Implementation of Clinical Establishment Act) HSS HSS 0.00 0.00
9.5.28.3 A.9.11.1 Promotional Training of ANMs to lady health visitor etc. RCH HSS 0.00 0.00
9.5.28.4 A.9.11.2 Training of ANMs, Staff nurses, AWW, AWS RCH HSS 0.00 0.00
9.5.28.5 A.9.4 IMEP Training 0.00
9.5.28.5.a A.9.4.1 TOT on IMEP RCH HSS 0.00 0.00
9.5.28.5.b A.9.4.2 IMEP training for state and district programme managers RCH HSS 0.00 0.00
9.5.28.5.c A.9.4.3 IMEP training for medical officers RCH HSS 0.00 0.00
9.5.28.5.d A.9.4.4 Others (please specify) RCH HSS 0.00 0.00
Any other (please specify) RCH HSS 0.32
Nursing Directorate RCH HSS -
A.9.11.3.26 week training of faculty members from ANM / GNM schools
at the State Nodal Centre, BerhampurRCH HSS 15/batch 1179400 11.79 0 -
A.9.11.3.36 days training (ToT) of Nurse Trainers and Medical Officers
on Skills Lab at National Skills lab, DelhiRCH HSS per person 25000 0.25 0 -
A.9.11.3.4 6 days DAKSH training for faculty and staff nurses RCH HSS 16 per batch 132000 1.32 0 -
1 day State level review meeting (29 participants and 10
facilitators)RCH HSS per meeting 60000 0.60 0 -
2 days ToT for Master Facilitators for PSE Strengthening RCH HSS per meeting 75000 0.75 0 -
2 days training on Skills lab and Competency Based Education RCH HSS per training 56500 0.57 0 -
Virtual Classes form SNC Berhampur RCH HSSPer unit per
annum80000 0.80 0 -
Technical & Management training of MBBS Doctors RCH HSS -
A.9.8.4.1.5.130 days Induction training for newly appointed MBBS doctor
at State LevelRCH HSS per person 42700 0.43 0 - Budget Not Approved
A.9.8.4.1.5.2
Management Development Programme ( MDP) for Sr. Health
Administration (MO I/c, ADMOs, SDMOs & Addl. Director) at
reputed Institutions.
RCH HSS 30 / batch 168000 1.68 0 - Budget Not Approved
9.5.28.6
Page 78 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
A.9.8.4.1.5.3Post Graduate Diploma in Public Health Management (
PGDPHM) course of MBBS Doctors (1 Yr Course)RCH HSS person 325000 3.25 0 -
A.9.8.4.1.5.42 days Hands on Training of DDM & DEO of all district,
Directorate, MCH (Hospital Manager & DEO) etc on TMIS RCH HSS 30/batch 100000 1.00 0 - Budget Not Approved
Field validation of database reported in TMIS RCH HSS Per visit 20000 0.20 0 -
Training for IEC/BCC RCH HSS - -
A.9.8.4.1.6.13 days Training on Basic Health Communication skill to
CPM/APM/PHM at State levelRCH HSS 30/ Batch 100000 1.00 0 -
A.9.8.4.1.6.2
3 days Skill based training on management of Health
Commuication to communication programme officers at state
level 15 District
RCH HSS 30/ Batch 125000 1.25 0 -
A.9.8.4.1.6.34 days training on Taranga - Social Behaviour Change
Communication (SBCC) skills at District levelRCH HSS 30/ batch 65000 0.65 0 -
A.9.8.4.1.6.4
1 day orientation of Health worker (Male) on the
communication skill and use of communication tools like FFL
Video and Flip Book etc.
RCH HSS 30/batch 21000 0.21 0 -
One Day orientation of Health Worker (Female) and Add ANM
on the communication skill and use of communication tools
like FFL video and flip Book etc.
RCH HSS 30/batch 21000 0.21 0 -
Training for NGO/PPP RCH HSS - 0.32
PHC(N) Management projects RCH HSS - 0.32
A.9.8.4.1.7.1.1 21 day SAB training for AYUSH MOs at the District level RCH HSS Per Person 15000 0.15 - Budget shifted to Line item 9.5.1.6
A.9.8.4.1.7.1.2 21 day SAB training for ANMs at the District level RCH HSS Per Person 15000 0.15 - ANM/ SN engaged for PHC(N) management under PPP mode,
to be met out of line no 9.5.1.6
A.9.8.4.1.7.1.5NSSK training (2 days) to the AYUSH MOs with other
participants at the District levelRCH HSS Per Person 2647 0.03 6 0.16
A.9.8.4.1.7.1.6NSSK training (2 days) to the ANMs with other participants at
the District levelRCH HSS Per Person 2647 0.03 6 0.16
A.9.8.4.1.7.1.7Project Management training for Project Coordinators by
Reputed Institutions at the State level (3 days)RCH HSS 40/batch 246000 2.46 0 -
A.9.8.4.1.7.1.8
Technical updation training of AYUSH MOs on RMNCH+A,
NDCP, NCD, monitoring of fixed day activities etc at State
level (3 days)
RCH HSS 40/batch 246000 2.46 0 - Budget Not Approved
A.9.8.4.1.7.1.9Technical updation training to MBBS MOs on RMNCH+A,
NDCP, NCD at the State level (3 days)RCH HSS 40/batch 246000 2.46 0 - Budget Not Approved
A.9.8.4.1.7.1.10Multi skilling training of Lab Technicians at Pathology of DHH
level (5 days).RCH HSS per person 5900 0.06 0 -
A.9.8.4.1.7.1.114 day Refresher Training for AYUSH Mos & ANMs of Arogya
Plus Projects on RMNCH+A , NCD, NDCP at state levelRCH HSS 20/ batch 178000 1.78 0 - Budget Not Approved9.5.28.6
Page 79 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
A.9.8.4.1.7.1.12
1 day State level review Cum orientation of NGO chief
functionaries & Project Coordinators/ a staff of Concerned
projects of Arogya Plus and PHC (N) maanagement Projects.
RCH HSS 30 batch 75000 0.75 - Budget Not Approved
For NGOs managing Maternity Waiting Homes RCH HSS -
A.9.8.4.1.7.2.12 days refresher training of ANMs engaged at Maternity
Waiting Homes RCH HSS 35/batch 197000 1.97 0 -
A.9.8.4.1.7.2.2
1 day State level review Cum orientation of NGO chief
functionaries and ANM cum Coordinator on Mgt of Maa
Gruha Projects.
RCH HSS 34/ batch 82500 0.83 0 - Activity shifted to Programme Management
Management development programme at reputed
institutionsRCH HSS -
A.9.8.4.1.8.12 days Regional level User Maintenance Training medical
equipments instruments of ICU & SNCU & NBSURCH HSS 25/batch 77500 0.78 0 -
A.9.8.4.1.8.22 days training of user maintenance of medical equipments
instruments of Govt. MCH & Sishu Bhavan .RCH HSS 25/batch 77500 0.78 0 -
Training for Integrated Service Delivery RCH HSS - -
3 days Refresher training on skill development of Counsellor
of DHH, FRUs (SDH/ CHC) in a reputed InstitutionRCH HSS 30/ batch 141510 1.42 -
Approval Pended
5 days training on skill development for Physiotherapist on
Nuro- spinal at State Head Quarter (SV NIRTAR, Oltapur)RCH HSS 30/ batch 330000 3.30 -
Approval Pended
5 days training on skill development for Physiotherapist on
Nuro-Spinal at Reputed institution (Outside State)RCH HSS per person 50000 0.50 -
Approval Pended
A.9.8.4.1.9.3
2 days Refresher training of Social Worker on Skill
development and Programme orienatation at state level/
MCH
RCH HSS 20/ batch 102000 1.02 0 -
A.9.8.4.1.9.42 day State Level Refresher training of Audiologist onAudilogy
& Speech Therapy .RCH HSS 28/ batch 132000 1.32 0 -
A.9.8.4.1.9.5 2 day refresher training of Epidemiologist at state level RCH HSS 30/ batch 132000 1.32 0 -
A.9.8.4.1.9.6 1 day refresher training of PPM coordinators at state level RCH HSS 30/ batch 72000 0.72 0 -
2 day refresher & orientatiion for ADMO FW, DPM and PPM
Coordinators on new GoI Guideline of NGO screening at
State Level.
RCH HSS 45/ batch 198000 1.98 - Budget Not Approved
A.9.8.4.1.9.72 day refresher handson training of Case Worker at CoE,
Cuttack, MH Dept.RCH HSS 25/ batch - 0 - Budget Not Approved
A.9.8.4.1.9.82 day Refresher training of Special Educator at reputed
institution at state HQRCH HSS 28/ batch - 0 - Budget Not Approved
A.9.8.4.1.9.9 7 days Multi Skilling Training of LTs of CHCs at state levlel. RCH HSS 10/ batch 132000 1.32 0 -
9.5.28.6
Page 80 of 280
Kandhamal_Training
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
2 day training of Help Desk personnel on ToR & programme
orientation at district level.RCH HSS 25/ batch 42340 0.42 -
Approval Pended
A.9.9.2.1 Gender Based Violance (GBV) RCH HSS -
A.9.9.2.1.1
One day sensitization on SOP OF Gender Based Violence &
Child Sexual abuse for health Care providers of Private
medical Colleges
RCH HSS 50/batch 50000 0.50 0 -
A.9.9.2.1.2One day sensitization of doctors, counsellors & health care
providers of 5 new sanctionted One Stop Centres RCH HSS 50/batch 50000 0.50 0 -
A.9.9.2.1.3One day District level refresher on SOP of GBV & Child
Sexual abuse for health care providers of 10 district . RCH HSS 30/batch 26000 0.26 0 -
A.9.9.2.1.4One day refresher training on SOP of GBV & child sexual
abuse for doctors of 10 districts at state level RCH HSS 50/ batch 50000 0.50 0 -
A.9.9.2.1.5One day orientation of ADMO(Fw) on GVB & Child sex abuse
at state levelRCH HSS 30/batch 40000 0.40 0 -
A.9.2.2.1 Strengthening of Training Unit (State & District) RCH HSS Lumpsum 2000000 20.00 0 - Fund approved towards strengthening of 10 DTUs &
Strengthening of Training Centres
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 IDSP
5 NLEP
6 RNTCP
7 NVBDCP
8 NPCB
9 NPHCE
10 NPCDCS
11 NTCP
12 NMHP
13 NPPCF
14 NPPCD
15 NPPC
9.5.28.6
Page 81 of 280
Kandhamal_Review& Research
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
10 Reviews, Research, Surveys and Surveillance 3.47
10.1 Reviews 1.47
10.1.1 A.1.4 Maternal Death Review (both in institutions and community) RCH MH Per case 450 0.00 23 0.10
Budget proposed for - Honorarium to investigators (@Rs.150/-
per person x 3 persons) for Community based maternal death
investigation
Child Death Review RCH CH 1.36Verbal autopsy to be done at all 30 districts for 12 months
Brief investigation by ANM (all deaths) RCH CH Per case 100 0.00 524 0.52
Investigation by investigator teams (No of verbal autopsy to
be done @ 6 cases per month)RCH CH Per case 500 0.01 158 0.79
Unit cost -
1. Honorarium for verbal autopsy investigation @Rs.300/- per
team per case
2.Travel expenses @Rs.200/- per team per case
As per CDR norms 6 cases per block p.m. has to be
investigated by investigator team
Support cost for family memebrs to attend review meeting
conducted by CollectorRCH CH Per case 200 0.00 24 0.05 Cases to be reviewed @2 cases p.m. per dist.
10.1.3 Any other (please specify) 0.00 0.00
10.2 Research & Surveys 0.00
Research, Studies, Analysis HSS HSS 0.00
Evaluation of quality and effectiveness of ASHA programme
by third partyHSS NHSRC Lumpsum 500000 5.00 0 0.00
Study of FETO Maternal Outcome in Overt & Subclinical
Hypothyroidism in a Tertiary Care Hospital of OdishaHSS MH Lumpsum 234000 2.34 0 0.00 Implementing agency - OG Deptt., SCB MCH, Cuttack
Study of Compliance with tobaco control legislation &
knowledge of cessation aids among smokers in selected cities
of Odisha
HSS NTCP Lumpsum 1490000 14.90 0 0.00Implementing agency - Deptt. of Community & Family
Medicine, AIIMS, Bhubaneswar
10.2.2 D.3 IDD Surveys/Re-surveys RCH NIDDCP Per Dist 50000 0.50 0 0.00
There are 17 endemic districts in the state. Re-survey planned
at 5 endemic districts (Gajapati, Ganjam, Nabarangpur, Angul
& Koraput) which have less house hold coverage of iodise salt
as compared to state average per NFHS-4.
10.2.3 F.1.3.h Operational Research - AES/ JE DCPNVBDCP -
AES/JE
10.2.4 F.1.4.b Microfilaria Survey - Lymphatic Filariasis DCP NVBDCP - LF Per Dist 50000 0.50 0 0.00Night Blood Survey@ 50000/-per district. Budget proposed
for selected 9 districts
10.2.5 F.1.4.cMonitoring &Evaluation (Post MDA assessment by medical
colleges (Govt. & private)/ICMR institutions )DCP NVBDCP - LF Per Dist 25000 0.25 0 0.00
Annexure for Review, Research & Surveys and Surveillance
10.1.2 A.2.8
10.2.1 B.20
Page 82 of 280
Kandhamal_Review& Research
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
10.2.6 F.1.4.fVerification and validation for stoppage of MDA in LF
endemic districts0.00
10.2.6.1 F.1.4.f.i a) Additional MF Survey DCP NVBDCP - LF Per district 70000 0.70 0 0.00 Budget proposed @ Rs 70000/district for 2 districts
10.2.6.2 F.1.4.f.ii b) ICT Survey DCP NVBDCP - LF Lumpsum 600000 6.00 0 0.00
Hon.to super visor @150/-per supervisor & Hon. For Focal
MDA kept at state level
(Rs. 120000 * 3 Districts = Rs. 360000)
2nd TAS(Rs.) - @ Rs 120000/district for 2 Districts
10.2.7 F.1.4.g Verification of LF endemicity in non-endemic districts 0.00 Already completed.
10.2.7.1 F.1.4.g.i a) LY & Hy Survey in 350 dist. DCP NVBDCP - LF 0.00 0.00
10.2.7.2 F.1.4.g.ii b) Mf Survey in Non- endemic dist. DCP NVBDCP - LF 0.00 0.00
10.2.7.3 F.1.4.g.iii c) ICT survey in 200 dist. DCP NVBDCP - LF 0.00 0.00
10.2.8 H.14 Research & Studies & Consultancy DCP RNTCP Lumpsum 500000 5.00 0 0.00Operational Research shall be carried out keeping in view
Active Case Finding (ACF) and Intensive Case Finding (ICF)
10.2.9 H.10 Research for medical colleges DCP RNTCP Per thesis 30000 0.30 0 0.00
10.2.10 M.1.3.4 Baseline/Endline surveys/ Research studies (DTCC) NCD NTCP 0.00 0.00
10.2.11 M.3.2.2 Baseline/Endline surveys/ Research studies (STCC) NCD NTCP 0.00 0.00
10.2.12 O.2.7.1 Research at State NCD Cell NCD NPCDCS 0.00 0.00
10.2.13 O.2.7.2 Research at Institutes NCD NPCDCS 0.00 0.00
10.2.14 Any other (please specify) 0.00 0.00
10.3 Surveillance 0.00
10.3.1 Strengthening surveillance under NVBDCP 0.00
10.3.1.1 F.1.2.a(i) Apex Referral Labs recurrent DCP
NVBDCP -
Dengue/Chikun
gunya
lumpsum 100000 1.00 0 0.00
10.3.1.2 F.1.2.a(ii) Sentinel surveillance Hospital recurrent DCP
NVBDCP -
Dengue/Chikun
gunya
Per Unit 100000 1.00 0 0.00
10.3.1.3 F.1.2.a(iii) ELISA facility to Sentinel Surv Labs DCP
NVBDCP -
Dengue/Chikun
gunya
0 0.00 0 0.00
10.3.1.4 F.1.3.aStrengthening of Sentinel sites which will include Diagnostics
and Case Management, supply of kits by GoIDCP
NVBDCP -
AES/JE0 0.00 0 0.00
10.3.1.5 F.1.4.h Post-MDA surveillance DCP NVBDCP - LF Per District 20000 0.20 0 0.00
10.3.1.6 Any other (please specify) DCP NVBDCP Lumpsum 1000000 10.00 0 0.00
10.3.2 O.2.7 Surveillance under NPCDCS 0.00
10.3.2.1 O.2.7.1 At State NCD Cell NCD NPCDCS 0.00 0.00
10.3.2.2 O.2.7.2 At Institutes NCD NPCDCS 0.00 0.00
10.3.2.3 Any other (please specify) NCD NPCDCS 0.00 0.00
10.3.3 Any Other surveillance activities (please specify) 0.00 0.00
10.4 Other Recurring cost 2.00
10.4.1 D.6 Management of IDD Monitoring Laboratory RCH NIDDCP Per IDD Lab 100000 1.00 0 0.00Recurring cost for State IDD laboratory which has been
integrated with SPHL
Page 83 of 280
Kandhamal_Review& Research
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
10.4.2 E.3.2
Recurring costs on account of Consumables, kits,
communication, misc. expenses etc. at each district public
health lab (applicable only for functional labs having requisite
manpower)
DCP IDSP Per DPHL 200000 2.00 1 2.00
10.4.3 E.3.4
Referral Network of laboratories (Govt. Medical College labs)
Reimbursement based payment for laboratory tests (to be
calculated for already approved labs in previous PIPs of States
for corresponding next years)
DCP IDSP Per unit 100000 1.00 0 0.00
10.4.4 E.3.5Expenses on account of consumables, operating expenses,
office expenses, transport of samples, miscellaneous etc. DCP IDSP Per unit 200000 2.00 0 0.00
10.4.5 E.5.1 Costs on Account of newly formed districts DCP IDSP 0.00 0.00 Not Applicable
10.4.6 F.1.4.f.iii ICT Cost DCP NVBDCP 0.00 0.00
10.4.7 Any other (please specify) RCH MH Per MWH 100000 1.00 0 0.00
1.Pool- RCH, Prg. Division - MH
Evaluation of Maternity Waiting Home those would
completed 3yrs term in 2018-19
SL No Component Colour code
1 RCH
2 HSS
3 NIDDCP
4 IDSP
5 RNTCP
6 NVBDCP
7 NPCDCS
8 NTCP
Page 84 of 280
Kandhamal_IEC_BCC
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
11 IEC/BCC 60.58
11.1 B.10.2Development of State Communication strategy (comprising of
district plans)HSS HSS 0.00 0.00
11.2 B.10.4Interpersonal Communication Tools for the frontline health
workersHSS HSS 0.00 0.00
11.3 B.10.5Targeting Naturally Occurring Gathering of People/ Health
MelaHSS HSS 0.00 0.00
11.4 B.10.3.1 IEC/BCC activities under MH 2.41
The behaviours those will be focused during 2018-19 in
maternal health are as follows:
1.Entitlements under JSSK scheme and services under
PMSMA
2. Services and facilities in Maternity waiting homes
3. Danger signs among PWs and their referral
4. Promoting consumption of IFA, Albendazole & Calcium
among pregnant and lactating mothers, Intake of Misoprostol
by home delivery cases for prevention of PPH.
5. Safe abortion Practices & facilities
6. Importance of screening of HIV, Syphilis and Diabetes
during pregnancy
Media Mix of Mid Media/ Mass Media HSS MH 2.02
Mass Media Interventions HSS MH
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 1 minutes per day
3days /month
HSS MH per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per Day per monthHSS MH per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 60 minutes
per month
HSS MH per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. in 1 paper HSS MH Per day 55000 0.55 0 -
Mid Media Interventions HSS MH
District level HSS MH
Dynamic hoarding - Change of flex for hoarding @ 1 no for
each district HQ and for block) HSS MH per flex 1000 0.01 14 0.14
Folk show / street threator out reach pockets HSS MH per show 3000 0.03 12 0.36
Use of FFL video communication high focus blocks HSS MHper video
show1000 0.01 60 0.60
Branding of VHND Points HSS MH - 0 -
Day celebration : Safe Motherhood Day (11 Apr) & World
Health Day (7 Apr)HSS MH - -
At State level HSS MH Per event 100000 1.00 0 -
Annexure for IEC/BCC
11.4.1 B.10.3.1.1
Page 85 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
At Dist level HSS MHPer event per
dist10000 0.10 2 0.20
At Block level HSS MHPer event per
block3000 0.03 24 0.72
Inter Personal Communication HSS MH 0.39
Wall Writing HSS MH Per wall 500 0.01 78 0.39Entitlement of JSSK along with referral transportation for
notified hard to reach areas to be painted in walls @ 1 per GP
PICO Projector for SC HSS MH Per Projector 15000 0.15 0 0.00
Targeted selected Sub centres of 3 districts( Malkanagir,
Kalahandi and Gajapati) as IPC tool, using IPC tool provide
the health seeking behaviours and entitlements through PICO
projector.
11.4.3 Any other IEC/BCC activities (please specify) HSS MH 0.00 0.00
11.5 B.10.3.2 IEC/BCC activities under CH 18.15
The Child Health IEC/BCC activities including Supplementary
Nutrition & NRC will focus on the following behaviours &
schemes:
1. Identification of danger signs amongst newborns at
community Level
2. Using ORS & Zinc for management of U5 diarrhoea at
community Level
3. Identification of danger signs of U5 pneumonia &
management at community level
4. Promotion of EBF, Complementary Feeding & Kangaroo
Mother Care
5. Reduction of hot brandings (Chenka)
6. Promotion of RBSK & JSSK
7.Promotion of MAA & NDD Media Mix of Mid Media/ Mass Media HSS CH 17.23
Mass Media Interventions HSS CH
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 1 minutes per day
4days /month
HSS CH per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for one minute per Day for 1 day in a month HSS CH per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 30 minutes
per month
HSS CH per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. HSS CH Per day 55000 0.55 0 -
Mass Media Interventions - Special campaign for National
Deworming Day (NDD)HSS CH State level 200000 2.00 0 -
Mass Media Interventions - IDCF Campaign HSS CH 0
Mass Media Interventions - Supplementary Nutrition,NRC,
IYCFHSS CH
Mid Media Interventions HSS CH
11.5.1 B.10.3.2.1
11.4.1 B.10.3.1.1
11.4.2 B.10.3.1.2
Page 86 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Dynamic hoarding - Change of flex for hoarding @ 2 nos for
each district HQ and for block) HSS CH per flex 1000 0.01 16 0.16
Organising Folk show / street threator out reach pockets HSS CH per show 3000 0.03 0 -
Use of FFL video communication in non-IMR MMR strategy
districts( 1 show per block twice in year)HSS CH
per video
show1000 0.01 0 -
Printing of tool kit for new born & child care (Associated
Benefits and Risks) as education tool in snake & ladder formatHSS CH per set 25 0.00 172 0.04
One educational toolkit to be printed per Sub centre in snake
& ladder format for educating the caregivers on benefits &
risks associated with newborn & childcare
RBSK HSS CH -
Display board on Facilities available under RBSK & DEIC of
size 3'X2' at Gram panchaya Head QuartersHSS CH per board 360 0.00 172 0.62
Display Board on New born Screening (Visible birth Defects,
Eye defects & RoP Screening) at each delivery points.( 2
boards per DP)
HSS CHper Delivery
point720 0.01 25 0.18
Poster on RBSK & DEIC services at AWC & Schools HSS CH Lumpsum 45956 0.46 1 0.46
Dynamic regular hoarding including installations on RBSK &
DEIC services at district Head quarters. HSS CH per hoarding 15000 0.15 1 0.15
Intensive IEC campaign at all levels on RBSK in 5 districts with
functional DEICs to improve referralsHSS CH per dist 100000 1.00 0 -
Intensive IEC campaign to be conducted on RBSK & DEIC
activities in selected 5 district (Gajapati, Rayagada,
Malkangiri, Nuapada & Nabarangpur) which are poor
performing related to treatment & DEIC load.
Proposed activities :
1.Sensitisation of PRI members, teachers, ICD functionaries &
GKS on MHT visit schedule & DEIC services.
2.Awarnes rath/ Campaign/ Hoardings
District to plan, place it before RBSK core committee meeting
& approve it by appropriate authority at district level.
Mid-Media activities like : cable TV/ miking/Banner/Poster/
Leaflet/ Standy/Hoarding/ inauguration event for awareness
generation - Special campaign for National Deworming Day
(NDD)
HSS CH Lumpsum 229299 2.29 1 2.29
Mid-Media activities like : cable TV/ miking/Banner/Poster/
Leaflet/ Standy/Hoarding/ inauguration event for awareness
generation - IDCF Campaign
HSS CH Per dist/MC 100000 1.00 1 1.00 Rationale: @Rs. 1 Lakh per each district and each Municipal
corporation (30 + 5)
Mid Media Interventions -HBYC HSS CH -
IEC campaign HSS CH Per block 100000 1.00 12 12.00
Mid Media Interventions -IYCF HSS CH -
11.5.1 B.10.3.2.1
Page 87 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Posters on IYCF/MAA for all AWCs HSS CH Per AWC 15 0.00 2140 0.32
3 types of community level posters on MAA to be supplied to
all AWCs for community level sensitization on IYCF practices.
Prototypes developed by UNICEF may be used for printing.
11.5.2 B.10.3.2.2 Inter Personal Communication HSS CH 0.00 0.00
11.5.3 IEC for family participatory care HSS CH 0.00 0.00
Any other IEC/BCC activities (please specify) HSS CH 0.92
Day celebration : Breast Feeding Week (Aug 1-7) & Newborn
Care Week (Nov 15-21)HSS CH
At State level HSS CH Per event 100000 1.00 0 -
At Dist level HSS CHPer event per
dist10000 0.10 2 0.20
At Block level HSS CHPer event per
block3000 0.03 24 0.72
11.6 B.10.3.3 IEC/BCC activities under FP 6.83
Media Mix of Mid Media/ Mass Media HSS FP 1.35
Mass Media Interventions HSS FP
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 4 minutes per monthHSS FP per minute 30000 0.30 0 -
Pannel discussion at Doordarshan on quarterly basis HSS FPper
discussion/
month
50000 0.50 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per monthHSS FP per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 1 minutes per day total 30 minutes
per month
HSS FP per minute 1000 0.01 0 -
Publicity through Display Media through Wall Painting HSS FP per unit 500 0.01 41 0.21 Themes will be Newer Contraceptives and PPFP
Contraceptives only.
Publicity through Print Media in Alternative day HSS FP Per day 55000 0.55 0 -
Mid Media Interventions HSS FP
District level HSS FP
Dynamic hoarding - Change of flex for hoarding on FP/RH on
Topics mentioned @ 2 nos for each district head quarter one
for block)
HSS FP per flex 1000 0.01 14 0.14
Folk show / street theatre out reach pockets HSS FP per show 3000 0.03 24 0.72
Two poster at Sub centre and AWC regarding various new
contraceptive methods and promotion of male sterilisation HSS FP per poster 6 0.00 0 -
Block level HSS FP -
Video show at various outreach pockets (Using FFL Video) HSS FPper video
show1000 0.01 28 0.28
11.5.4
11.6.1 B.10.3.3.1
11.5.1 B.10.3.2.1
Page 88 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Village meeting involving all male members and PRI Members
on advantages of male sterilisation with a model NSV
successors
HSS FP 0 - 0 - Budget integrated with GKS untied funds
Prize distribution at sector level to successful Male
sterilisation acceptors ( in lottery basis)HSS FP - 0 - Integrated with Vasectomy fortnight
11.6.2 B.10.3.3.2 Inter Personal Communication HSS FP 0.00 0.00
IEC & promotional activities for World Population Day
celebrationRCH FP 4.06
At State level RCH FP Lumpsum 100000 1.00 0 -
At District level RCH FP
District level function and documentation RCH FP Per dist 10000 0.10 1 0.10
IEC Van RCH FP Per block 20000 0.20 12 2.40
Hoardings, Posters and leaflets RCH FP Per block 10000 0.10 12 1.20
At Block level RCH FP
Block level function RCH FP Per block 3000 0.03 12 0.36
IEC & promotional activities for Vasectomy Fortnight
celebration RCH FP 1.42
At State level FP Lumpsum 100000 1.00 0 -
At District level FP
District level function and documentation FP Per dist 10000 0.10 1 0.10
Miking FP Per block 6000 0.06 12 0.72
Posters and leaflets FP Per block 5000 0.05 12 0.60
11.6.5 A.3.7.4IEC activities for Mission Parivar Vikas Campaign (Frequency-
at least 4/year)RCH FP 0.00 0.00
11.6.6 Any other IEC/BCC activities (please specify) RCH FP 0.00 0.00
11.7 B.10.3.4 IEC/BCC activities under AH HSS AH 0.00
Media Mix of Mass Media/ Mid Media including promotion
of menstrual hygiene schemeHSS AH 0.00
Mass Media HSS AH
Production of TV spot HSS AH per spot - 1 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 2 minutes per day for
1 day /month
HSS AH per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for one minute per Day per day in a month HSS AH per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 10 minutes
per month
HSS AH per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. in 1 paper once in a month HSS AH Per day 55000 0.55 0 -
Mid Media HSS AH
Flex banner for RBSK MHTs on WIFS ( 2 nos of banner each
vehicle) Size- 3'X 4' Rs. 120 per bannerHSS AH per banner - 1272 -
11.7.2 B.10.3.4.2 Inter Personal Communication HSS AH 0.00 0.00
11.7.3 Any other IEC/BCC activities (please specify) HSS AH 0.00 0.00
11.8 IEC/BCC activities under Immunization 0.89
11.6.4 A.3.5.5
11.7.1 B.10.3.4.1
11.6.1 B.10.3.3.1
11.6.3 A.3.5.4
Page 89 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
IEC activities for Immunization RCH RI 0.89
Mass Media RCH RI
Production of TV spot RCH RI per spot 50000 0.50 0 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for one minute per day
for 2 days /month
RCH RI per minute 30000 0.30 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 30 minutes
per month
RCH RI per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. in 1 paper once in a month RCH RI Per day 55000 0.55 0 -
Mid Media RCH RI - -
Hoardings -Change of flex for hording on RH on topics
mentioned @2 nos for each districts and one for each BlockRCH RI Per hoarding 2000 0.02 1 0.02
Branding of ILR points with 4 number of sunboard mentioning
the SOP (1. Arrangement of Vaccine in ILR;2.New
Immunization schedule;3.steps of defrosting ;4.prevetive
maintence )
RCH RI per board 180 0.00 152 0.27
4 types of Job aids /SOP will be displaced based on addition of
new vaccines in the Immunization schedule at Cold chain
points-Once a year.
Block level RCH RI - -
Video show (using FFL video on Immunization) RCH RI per show 1000 0.01 60 0.60
Display of RI session site details in urban colonies and high
rising areas RCH RI per site 750 0.01 0 -
11.8.2 Any other IEC/BCC activities (please specify) RCH RI 0.00 0.00
11.9 IEC/BCC activities under PNDT 0.73
11.9.1 B.10.3.5 Creating awareness on declining sex ratio issue (PNDT) HSS PNDT Per dist 50000 0.50 1 0.50
Any other IEC/BCC activities (please specify) HSS PNDT 0.23
Mass Media HSS PNDT
Production of TV spot HSS PNDT per spot 50000 0.50 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 2 minutes per day for
2 days /month
HSS PNDT per minute 30000 0.30 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 10 minutes
per month
HSS PNDT per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. in 1 paper twice in a month HSS PNDT Per day 55000 0.55 0 -
Panel Discussion at DD HSS PNDTPer
Programme 50000 0.50 0 -
Mid Media HSS PNDT - -
Dynamic Hoarding at State Headquarter - Capital Hospital,
AIIMS, Airport, Railway Station. Bus Stand at 5 Municipal
corporation ( Bhubaneswar, Cuttack, Berhmapur, Rourkela
and sambalapur)
HSS PNDT Per hoarding 30000 0.30 0 - 11.9.2
11.8.1
Page 90 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
State Level Award to Best Districts under PC PNDT - Cash
Prize, Certificate, MementoHSS PNDT Lumpsum - -
Display boards at every Ultra Sound Centres, CHC, SDH, DHH
& Medical Colleges sub board Size-( 3' X 2')HSS PNDT Per Board 360 0.00 -
Dynamic Hoardings at 2 nos of hoarding at district level and
one at block levelHSS PNDT Per Hoarding 30000 0.30 -
Observation of the International and National Girl Child Day
on 24th January at Block levelHSS PNDT Per block 1500 0.02 12 0.18
Observation of the International and National Girl Child Day
on 24th January at District levelHSS PNDT Per district 5000 0.05 1 0.05
State level Observation of the International and National Girl
Child Day on 10th October and 24th January by PC PNDT CellHSS PNDT State 50000 0.50 0 -
11.10 B.10.7.4.5 IEC/BCC activities under Blood services & disorders 0.00
Mass Media Campaign HSS Blood Cell 0.00
State has initiated welfare schemes like exemption of service
charges for blood transfusion & Transportation cost for
attending appropriate institution for treatment/transfusion, e-
blood bank initiatives which need wide publicity through
print & electronic media.
Mass Media HSS Blood Cell
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 1 minutes per day
4days /month
HSS Blood Cell per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 2 minute per Day per monthHSS Blood Cell per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 2 minutes per day total 60 minutes
per month
HSS Blood Cell per minute 1000 0.01 0 -
Publicity through Print Media (One time display for Colour
Quarter page advt. in 1 paper HSS Blood Cell Per day 55000 0.55 0 -
11.10.2 HSS Blood Cell 0.00 0.00
11.11 B.10.6.5 IEC/BCC activities under NPPCD 0.00
11.11.1 Media Mix of Mid Media/ Mass Media HSS NPPCD 0.00 0.00
11.11.2 HSS NPPCD 0.00 0.00
11.12 IEC/BCC activities under NPPC 0.00
11.12.1 B.27.1.3 IEC for DH HSS NPPC 0.00 0.00
11.12.2 B.27.2.2 IEC for State Palliative care cell HSS NPPC 0.00 0.00
11.12.3 Any other IEC/BCC activities (please specify) HSS NPPC 0.00 0.00
11.13 IEC/BCC activities under NPPCF 0.00
11.13.1 B.10.6.6Health Education & Publicity for National Programme for
Fluorosis (State and District Level)HSS NPPCF 0.00 0.00
11.13.2 Any other IEC/BCC activities (please specify) HSS NPPCF 0.00 0.00
11.14 IEC/BCC activities under NIDDCP 0.20
11.14.1 B.10.6.7 Health Education & Publicity for NIDDCP RCH NIDDCP Lum sum 20000 0.20 1 0.20 Observation of IDD day
11.9.2
11.10.1
Page 91 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
11.14.2 Any other IEC/BCC activities (please specify) RCH NIDDCP Lum sum 0.00Printing of FAQs for AWCs. Printing of Reporting formats for
ASHAs in 17 endemic districts
11.15 IEC/BCC activities under NVBDCP 2.75
IEC/BCC for Malaria HSS NVBDCP 2.29
Mass Media HSS NVBDCP
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 15 minutes per month
for 2 months
HSS NVBDCP Per Minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per monthHSS NVBDCP Per Minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 1 minutes per day total 90 minutes
per month for 2 months
HSS NVBDCP Per Minute 1000 0.01 0 -
Publicity through Print Media HSS NVBDCP Per display 55000 0.55 0 -
Mid media & IPC HSS NVBDCP
World Malaria Day HSS NVBDCP
Advocacy at State Level (World Malaria Day) HSS NVBDCP Per Unit 100000 1.00 0 -
Advocacy at District Level (World Malaria Day) HSS NVBDCP Per District 10000 0.10 1 0.10
Advocacy at Block Level (World Malaria Day) HSS NVBDCP Lumpsum 116000 1.16 1 1.16
1. Advocacy at Block Level (World Malaria Day) @ Rs. 3000/-
per block
2.Infotainment @ Rs. 2000 per village
3. Local School Activities @ Rs. 1000 per school
4. Miking @ Rs. 1000 per village
GKS Sensitization at Sub centre level HSS NVBDCP Per SC 600 0.01 172 1.03 Proposed Rs 600/Subcenter p.a.
IEC/BCC for Social mobilization (Dengue and Chikungunya) HSS NVBDCP 0.46
Mass Media HSS NVBDCP
TV (Local channels)- Advertisement in the DD & local
channels HSS NVBDCP Per Minute 30000 0.30 0 -
Advertisement through AIR channels HSS NVBDCP Per Minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio HSS NVBDCP Per Minute 1000 0.01 0 -
Publicity through Print Media HSS NVBDCP Per display 55000 0.55 0 -
Mid media & IPC HSS NVBDCP
Observation of Anti Dengue Month (Sensitisation meeting at
district level)HSS NVBDCP Per District 10000 0.10 1 0.10
Observation of Anti Dengue Month Sensitization at Block
level HSS NVBDCP Per Block 3000 0.03 12 0.36
Sensitization of GKS at sub centre level HSS NVBDCP Per SC 600 0.01 0 -
Printing of Leaflets HSS NVBDCP Per Leaflet 1 0.00 0 -
Printing of FAQ HSS NVBDCP Per FAQ 10 0.00 0 -
Advocacy at State Level (National Dengue Day) HSS NVBDCP Lumpsum 100000 1.00 0 - Observance of National Dengue Day on 16th May 2018
IEC/BCC specific to J.E. in endemic areas HSS NVBDCP 0.00
Mass Media HSS NVBDCP
Publicity through Print Media HSS NVBDCP Per display 55000 0.55 0 -
11.15.2 B.10.6.9.b
11.15.3 B.10.6.9.c
11.15.1 B.10.6.9.a
Page 92 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Mid media & IPC HSS NVBDCP
Sensitization of GKS members and community volunteers at
sub centre level HSS NVBDCP Per SC 600 0.01 0 - To be met out of GKS/ VHSNC fund
Specific IEC/BCC for Lymphatic Filariasis at State, District,
PHC, Sub-centre and village level including VHSC/GKs for
community mobilization efforts to realize the desired drug
compliance of 85% during MDA
HSS NVBDCP 0.00
Mass Media HSS NVBDCP
TV (Local channels)- Advertisement in the DD & local
channels HSS NVBDCP Per Minute 30000 0.30 0 -
Advertisement through AIR channel HSS NVBDCP Per Minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio for
MDA campaignHSS NVBDCP Per Minute 1000 0.01 0 -
Publicity through Print Media HSS NVBDCP Per display 55000 0.55 0 -
Mid media & IPC HSS NVBDCP
Production of Banner HSS NVBDCP Per Banner 60 0.00 0 - @1 per block/ SC & 5 per Urban
GKS Sensitization HSS NVBDCP Per SC 600 0.01 0 -
Media Sensitization HSS NVBDCP Lumpsum 50000 0.50 0 -
Printing of leaflet HSS NVBDCP Per Leaflet 1 0.00 0 -
Printing of poster HSS NVBDCP Per Poster 6 0.00 0 -
Printing of FAQ HSS NVBDCP Per FAQ 10 0.00 0 -
11.15.5 B.10.6.9.e IEC/BCC/Advocacy for Kala-azar HSS NVBDCP 0.00 0.00
11.15.6 B.10.6.9.f IEC/BCC activities as per the GFATM project HSS NVBDCP 0.00 0.00
11.15.7 Any other IEC/BCC activities (please specify) HSS NVBDCP Per Show 1000 0.01 0.00Exclusive budget not approved under the said head, however
may be taken up the activity with the approved budget heads.
11.16 IEC/BCC activities under NLEP 0.36
IEC/BCC: Mass media, Outdoor media, Rural media,
Advocacy media for NLEPHSS NLEP 0.36
Mass Media Interventions HSS NLEP
Production of TV Spot on NLEP HSS NLEP Per spot 50000 0.50 0 -
Production of Radio Zingle on NLEP HSS NLEP Per zingle 25000 0.25 0 -
TV (Local channels)- Advertisement in the DD & local
channelsHSS NLEP Per minute 30000 0.30 0 -
Pannel discussion at Doordarshan HSS NLEP per discussion 50000 0.50 0 -
Advertisement through AIR channels HSS NLEP Per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio HSS NLEP Per minute 1000 0.01 0 -
Publicity through Print Media for 14 days HSS NLEP Per display 55000 0.55 0 -
Mid Media Interventions HSS NLEP
Display of sun board (2X3=6 sqft) @ 60/Sq.ft vinyl pasted
exhibits for all upto CHC level @ 02nos. per HIHSS NLEP Per institution 360 0.00 0 -
SPARSH Leprosy Awareness Campaign HSS NLEP
11.16.1 B.10.6.10
11.15.3 B.10.6.9.c
11.15.4 B.10.6.9.d
Page 93 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Anti Leprosy Day / SPARSH observation at State Level HSS NLEP Lumpsum 100000 1.00 0 -
Observation of SPARSH Leprosy Awareness Campaign at Block
levelHSS NLEP Per block 3000 0.03 12 0.36
Observation of SPARSH Leprosy Awareness Campaign at
village levelHSS NLEP per village 0.00 -
11.16.2 Any other IEC/BCC activities (please specify) HSS NLEP 0.00 0.00
11.17 IEC/BCC activities under RNTCP 2.57419
ACSM (State & district) DCP RNTCP 2.57
Mass Media Interventions DCP RNTCP
Production of TV Spot on RNTCP DCP RNTCP Per spot 50000 0.50 0 -
Production of Radio Zingle on RNTCP DCP RNTCP Per zingle 25000 0.25 0 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 2 minutes per day for
7 days
DCP RNTCP per minute 30000 0.30 0 -
Pannel discussion at Doordarshan DCP RNTCP per discussion 50000 0.50 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 2 minutes per day for 7 daysDCP RNTCP per minute 60000 0.60 0 -
Advertisement through FM Channels & Community Radio@
1000/- per minutes for 10 minutes per day total 7 daysDCP RNTCP per minute 1000 0.01 0 -
Publicity through Print Media DCP RNTCP Per display 55000 0.55 0 -
Mid Media Interventions DCP RNTCP
Flex change for hoarding DCP RNTCP Per hoarding 2000 0.02 14 0.28
World TB Day DCP RNTCP
TB Day observation at State level DCP RNTCP lumpsum 100000 1.00 0 -
TB Day observation at DTC level DCP RNTCP per DTC 10000 0.10 1 0.10
TB Day observation at DMC level DCP RNTCP per DMC 500 0.01 16 0.08
Wall Painting at Village level DCP RNTCP per painting 1000 0.01 14 0.14
Folk show at Identified location at DMC level DCP RNTCP 1/DMC 3000 0.03 16 0.48
Inter Personal Communication DCP RNTCP
IPC Tool for DOTS providers DCP RNTCP Per book 3 0.00 1473 0.04
Community meetings DCP RNTCP Per meting 1000 0.01 105 1.05
Patient provider meetings DCP RNTCP Per meting 1000 0.01 32 0.32
School / College-based activities DCP RNTCP 0.00 -
Sensitisation of PPs, NGOs, PRIs etc. DCP RNTCP Per meeting 4000 0.04 2 0.08
11.17.2 Any other IEC/BCC activities (please specify) DCP RNTCP Per Month 30000 0.30 0 0.00
Operational cost for mobile van to improve active case
findings in Urban areas.
Budget Component:
1. PoL & maintenance: @30000/- PM x 12 months= Rs. 3.60
lakhs
2. Driver Payment : Budgeted under Programme
Management
11.16.1 B.10.6.10
11.17.1 H.4
Page 94 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
11.18 IEC/BCC activities under NPCB 0.30
State level IEC @Rs.5 lakh for Minor State and Rs.10 lakh for
Major States under NPCBHSS NPCB 0.30
Mass Media Interventions HSS NPCB
Publicity through Print Media during 3 designated days@ 4
display per Designated Day HSS NPCB Per display 55000 0.55 0 - At State level
Advertisement through FM channels & Community Radio@
1,000/- per minutes for 30 minutes per designated days
corresponding months
HSS NPCB per minute 1000 0.01 0 - Activity dropped
Pannel discussion at Doordarshan during 3 designated days HSS NPCB Per discussion 50000 0.50 0 - At State level
Mid Media Interventions HSS NPCB
Observance of 3 nos of Designated days( World sight day,
World Glaucoma day and World Eye donation day) at State
Level
HSS NPCB Per event 100000 1.00 0 - At State level
World Glaucoma day and World ,Observance of 3 nos of
Designated days( World sight day, Eye donation fortnight) at
district level.
HSS NPCB Per event 10000 0.10 3 0.30 At District Level
Advertisement through FM channels & Community Radio@
1,000/- per minutes for 10 minutes for 3 months in
corresponding months
HSS NPCB per minute 1000 0.01 - Activity dropped
Observation of World Eye donation fortnight. HSS NPCBPer Selected
dist30000 0.30 0 -
Eye Donation centre 5 (Cuttack, Ganjam, Khurdha,
Kendujhar,Sambalpur)
11.18.2 Any other IEC/BCC activities (please specify) HSS NPCB 0.00 0.00
11.19 B.10.6.12 IEC/BCC activities under NMHP 0.91
11.19.1 B.10.6.12.a Translation of IEC material and distribution HSS NMHP 0.00 0.00
Awareness generation activities in the community, schools,
workplaces with community involvementHSS NMHP 0.91
Kiosk Fairs/Local Festivals HSS NMHP Per Dist 10000 0.10 1 0.10
Mental Health Day observation meeting followed by IEC Van
(Manasika Sachetanata Ratha) at District LevelHSS NMHP per Dist 30000 0.30 1 0.30
FAQs on Mental Health for ASHAs HSS NMHP per FAQ 10 0.00 1543 0.15
Folk show (patha pranta natak under the brand SANTWANAA) HSS NMHP Per Show 3000 0.03 12 0.36 4 Show per Block in targeted 23 Districts
Any other IEC/BCC activities (please specify) HSS NMHP 0.00
Production of TV Spot/Zingles HSS NMHPPer Spot/
Zingle50000 0.50 0 -
Pannel discussion in local TV Channels HSS NMHP Per discussion 50000 0.50 0 -
Advertisement in leading Local Dailies HSS NMHP Per display 55000 0.55 0 -
11.20 IEC/BCC activities under NPHCE 1.07
Public Awareness & IEC for NPHCE HSS NPHCE 1.07
Display of sun board (2X3=6 sqft) vinyl pasted exhibits at
OPDs/Screening Centres@ 1 no per Health institution at
CHCs,SDHs & DHHs
HSS NPHCE Per board 360 0.00 53 0.19 All institution up to PHC level including urban
11.19.2 B.10.6.12.b
11.19.3
11.20.1 B.10.6.13
11.18.1 B.10.6.11
Page 95 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Observance of International Day for Elderly at District Level HSS NPHCE Per dist 10000 0.10 1 0.10 30 Districts & 5 Municipal Corporations
Observance of International Day for Elderly at block Level HSS NPHCE Per block 3000 0.03 12 0.36
Observance of International Day for Elderly HSS NPHCE
Per
Designated
Day
110000 1.10 0 -
Sensitisation programme at Jara Niwas (Old age home) HSS NPHCE Per Jara Niwas 3000 0.03 2 0.06 Per district 2 selected old age home targeted
Street Play/Folk show HSS NPHCE Per Show 3000 0.03 12 0.36 1 shows per block
Production of TV Spot/Zingles HSS NPHCEPer Spot/
Zingle50000 0.50 0 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 2 minutes per monthHSS NPHCE per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per monthHSS NPHCE per minute 60000 0.60 0 -
Advertisement through FM channels & Community Radio@
1,000/- per minutes for 10 minutes per monthsHSS NPHCE per minute 1000 0.01 0 -
Advertisement in leading Local Dailies HSS NPHCE Per Quarter 55000 0.55 0 -
11.20.2 Any other IEC/BCC activities (please specify) HSS NPHCE 0.00 0.00
11.21 IEC/BCC activities under NTCP 1.46
IEC/SBCC for NTCP HSS NTCP 1.46
Mass Media HSS NTCP
Production of TV Spot/Zingles HSS NTCPPer Spot/
Zingle50000 0.50 0 -
TV (Local channels)- Advertisement in the DD & local
channels @ Rs.30,000/- per minute for 3 minutes per monthHSS NTCP per minute 30000 0.30 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per monthHSS NTCP per minute 60000 0.60 0 -
Advertisement through FM channels & Community Radio@
1,000/- per minutes for 10 minutes per monthsHSS NTCP per minute 1000 0.01 0 -
Advertisement in leading Local Dailies HSS NTCP Per display 55000 0.55 0 -
Mid Media HSS NTCP
Screening cum awareness camp at slum area HSS NTCP Per camp 10000 0.10 10 1.00 10 camps per dist & 5 Municipal Corporation & Puri area
Observation of World Tobacco day HSS NTCP
State level Media awareness & observation HSS NTCP Lump sump 100000 1.00 0 -
District Level HSS NTCP Per Dist 10000 0.10 1 0.10
Block Level HSS NTCP Per Block 3000 0.03 12 0.36
IPC HSS NTCP
Flip Book for counselling at Integrated Counselling Centre HSS NTCP Per Flip Book 100 0.00 0 -
11.21.1 B.10.6.14
11.20.1 B.10.6.13
Page 96 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Brochure for tobacco users HSS NTCP Per brochure 5 0.00 0 -
Development of IEC Material video spot (Translation &
Development of Audio visual documents on Tobacco control
for School Health Programme and awareness programme at
slums)
HSS NTCP Lump sump 500000 5.00 0 -
11.21.2 Any other IEC/BCC activities (please specify) HSS NTCP 0.00 0.00
11.22 O.2.3 IEC/BCC activities under NPCDCS 3.34
IEC/BCC for State NCD Cell NCD NPCDCS 0.00
TV - Advertisement in the DD & local channels @ Rs.30,000/-
per minute for 3 minutes per monthNCD NPCDCS per minute 30000 0.30 0 -
Panel discussion in local TV Channels NCD NPCDCS Per show 50000 0.50 0 -
Advertisement through AIR channels@ 60,000/- per minutes
for 1 minute per monthNCD NPCDCS per minute 60000 0.60 0 -
Advertisement through FM channels & Community Radio@
1,000/- per minutes for 15 minute per monthNCD NPCDCS per minute 1000 0.01 0 -
Advertisement in leading Local Dailies NCD NPCDCS Per display 55000 0.55 0 - Level of organisation of activity - State
Observance of World Diabetics Day (14 November) at State
Level/World Hypertension Day/ World Cancer Day & other
NCD designated Day
NCD NPCDCS
Per
Designated
Day
100000 1.00 0 - Level of organisation of activity - State
IEC/BCC for District NCD Cell NCD NPCDCS 3.34
Dynamic hoarding - Change of flex for hoarding on NCD in
strategic locationsNCD NPCDCS Per flex 2000 0.02 14 0.28
Level of organisation of activity - District
Observance of World Diabetics Day (14 November) /World
Hypertension Day/ World Cancer Day/Stroke Day & other
NCD designated days at District Level
NCD NPCDCS
Per
Designated
Day
10000 0.10 4 0.40 Level of organisation of activity - District
Observance of World Diabetics Day (14 November)/World
Diabetics Day/World Hypertension Day/ World Cancer Day(
Average 4 per district) at Block level
NCD NPCDCS
Per
Designated
Day
3000 0.03 48 1.44 Level of organisation of activity - District
School Programme on NCD for student & teachers NCD NPCDCS Per School 600 0.01 84 0.50 7 Schools per Block
Level of organisation of activity - District
Street Play/Folk show NCD NPCDCS Per Show 3000 0.03 24 0.72 2 Nos per Block
Level of organisation of activity - District
Special IEC plan for RHD NCD NPCDCS -
Display of sun board (2X3=6 sqft) (@Rs.60/Sq.ft) vinyl pasted
exhibits for all institutions @ 02nos. per HINCD NPCDCS Per institution 360 0.00 0 -
2 per Health Institution up to PHC level in 2 targeted districts
(Khurda & Cuttack)
Level of organisation of activity - District
11.22.3 IEC/BCC activities for Universal Screening of NCDs NCD HSS/NPCDCS 0.00 0.00Already approved in 2017-18, budget kept as committed
unspent balance
11.22.4 Any other IEC/BCC activities (please specify) NCD NPCDCS 0.00 0.00 Budget Shifted to line item 11.22.1 & 11.22.2
11.23 IEC/BCC activities under ASHA 0.00
11.23.1 Wall painting on ASHA incentive provisions HSS HSS/NHSRC-CP Per Sector 500 0.01 0.00 Budget not Approved
11.21.1 B.10.6.14
11.22.1 O.2.3.1
11.22.2 O.2.3.2
Page 97 of 280
Kandhamal_IEC_BCC
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
11.23.2 HSS HSS/NHSRC-CP 0.00 0.00
11.24 Other IEC/BCC activities 18.60
IEC activities for Health & Wellness centre (H&WC) HSS HSS 0.00 18.50
For PHC level H&WC HSS HSS Per unit 50000 0.50 33 16.50
For SC level H&WC HSS HSS Per unit 25000 0.25 8 2.00
11.24.2 B.10.6.1Innovative IEC/ BCC Strategies including mobile based solutions,
social media and engagement of youthHSS HSS 0.00 0.00
11.24.3 B.10.6.14.1 SBCC/IEC/Advocacy campaigns 0.00
11.24.3.1 B.10.6.14.1.b Places covered with hoardings/ bill boards/ signage etc. HSS HSS 0.00 0.00
11.24.3.2 B.10.6.14.1.cUsage of Folk media such as Nukkad Natak/ mobile audio
visual services/ local radio etc.HSS HSS 0.00 0.00
11.24.3.3 B.10.6.14.3.a Development of IEC Material HSS HSS 0.00 0.00
11.24.3.4 B.10.6.14.3.b State-level IEC Campaigns/Other IEC Campaigns HSS HSS 0.00 0.00
11.24.4 Any other IEC/BCC activities (please specify) 0.10
11.24.5.1 IEC/BCC activities under Referral transport HSS HSS Lumpsum 5000000 50.00 0 0.00
11.24.5.2 IEC/BCC activities under NOHP HSS NOHP Per dist 10000 0.10 1 0.10
643 Mobile Health Teams under RBSK will be provided with
Leaflets for distribution in schools for improving awareness
among school students.
SL No Component Colour code1 RCH
2 HSS
3 RI
4 NIDDCP
5 NLEP
6 RNTCP
7 NVBDCP
8 NPCB
9 NPHCE
10 NPCDCS
11 NTCP
12 NMHP
13 NPPCF
14 NPPCD
15 NOHP
16 NPPC
11.24.1 B18.3
Page 98 of 280
Kandhamal_Printing
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
12 Printing 8.04
12.1 Printing activities under MH 0.00
12.1.1 A.1.4 Printing of MDR formats RCH MH Lumpsum 16296 0.16 0 0.00
Printing of
Maternal Death Surveillance & Response (MDSR) format
1.Annexure-4 for facility based investigation
2.Annexure-5 for community level investigation for all
maternal death
3.Annexure-6 for all maternal death-
Maternal Near Miss Review format
4.Annexure-1 for all near miss cases
To be printed & supplied from State
12.1.2 B.10.7.1 Printing of MCP cards, safe motherhood booklets etc. HSS MH Per card 8 0.00 0 0.00
1.Mother & Child Protection Card (MCP Card)
2.Safe motherhood booklet
To be printed & supplied from State
12.1.3Printing of labour room registers and case sheets/ LaQshya
related printing RCH MH Lumpsum 200000 2.00 0 0.00
1.Labour Modular register
2.Delivery Case sheet
3.Printing of Guidelines
To be printed & supplied from State 12.1.4 Printing cost for MAA programme RCH CH 0.00 0.00
12.1.5 Any other (please specify) HSS MH Lumpsum 891670 8.92 0 0.00
1.PNC ward register
2.Comprehensive Abortion Care
2.1.Consent Form
2.2.RMP Opinion Form
2.3.Form-II
2.4.Addmission register Form-III
2.5.Evacuation Register
3.VHND reporting format
3.1.Sub centre level monthly reporting by ANM
3.2.Block level monthly reporting by BPMU
To be printed & supplied from State
12.2 Printing activities under CH 1.67
12.2.1 A.2.1 Printing for IMNCI RCH CH 0.00 0.00
12.2.2 A.2.6Printing for Management of Diarrhoea & ARI & micronutrient
malnutritionRCH CH 0.00 0.00
12.2.3 A.2.7 Printing for Micronutrient Supplementation Programme RCH CH Per Poster 100 0.00 344 0.34
Programme- Vitamin A Supplementation
Flex/ Banner proposed for all the Sub Centres in the state &
for 2 rounds
Printing of Child Death Review formats RCH CH 0.00
Form-1 RCH CH Per form 1.0 0.00 0 0.00Form 1-ASHA notification -To be printed & supplied from
State
Fprm-2 RCH CH Per form 2.0 0.00 0 0.00Form 2-ANM investigation form -To be printed & supplied
from State
Annexure for Printing
12.2.4 A.2.8Page 99 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Form-3 RCH CH Per form 3.0 0.00 0 0.00Form 3a-Neonatal Verbal Autopsy Form -To be printed &
supplied from State
Form-3b RCH CH Per form 3.0 0.00 0 0.00Form 3b-Post Neonatal Verbal Autopsy Form -To be printed &
supplied from State
Form-3c RCH CH Per form 2.0 0.00 0 0.00Form 3c-Social Autopsy Form -To be printed & supplied from
State = Rs.99476/-
Form-4a RCH CH Per form 3.0 0.00 0 0.00Form 4a-Facility Neonatal Investigation Form -To be printed &
supplied from State
Form-4b RCH CH Per form 3.0 0.00 0 0.00Form 4b-Facility Post Neonatal Investigation -To be printed &
supplied from State
12.2.5 B.10.7.4.1
Printing of compliance cards and reporting formats for
National Iron Plus Initiative-for 6-59 months age group and
for 5-10 years age group
HSS CH 0.00 0.00 Formats already available
12.2.6 B.10.7.4.7Printing of IEC materials and reporting formats etc. for
National Deworming DayHSS CH Lumpsum 114650 1.15 1 1.15
Printing of IEC material proposed under IEC.
Printing of Reporting Format & training material - In 30
districts @ Rs.4,777/- per block per round and 5 municipal
corporations @ Rs. 50,000/- per MC per round for two rounds
12.2.7 B.10.7.4.8 Printing of IEC Materials and monitoring formats for IDCF HSS CH Per unit 18000 0.18 1 0.18In 30 districts and 5 municipal corporations @ Rs.18,000/- per
district and MC
12.2.8 B.10.7.4.9Printing cost of IEC materials, monitoring forms etc. for
intensification of school health activitiesHSS CH 0.00 0.00
12.2.9 Printing & translation cost for Family participatory care (KMC) HSS CH 0.00 0.00
12.2.10 Printing (SNCU data management) HSS CH Per sheet 50 0.00 0 0.00
Printing of SNCU Case Sheet
Other printing i.e. Discharge Note, Referral Note, Admission
Register, Follow up Register, Facility Follow up record book ,
met out of SNCU contingency fund-To be printed & supplied
from State
12.2.11 Printing of HBNC referral cards and other formats HSS CH 0.00 0.00
12.2.12 Any other (please specify) HSS CH Per card 1.5 0.00 0 0.00Printing of Gentamycin Treatment Card (INAP) -To be printed
& supplied from State
12.3 Printing activities under FP 0.00
12.3.1 A.3.2.7 Dissemination of FP manuals and guidelines RCH FP 0.00 0.00
12.3.2 A.3.7.4 Printing for Mission Parivar Vikas Campaign RCH FP 0.00 0.00
12.3.3 A.3.5.6.1 Printing of FP Manuals, Guidelines, etc. RCH FP Per mannual 200 0.00 0 0.00
1.Printing of quality assurance manual
2.Printing of FPIS manual
3.Other required manuals like Injectable contraceptive
manuals, quality assurance manuals, manuals for oral pills
have already been printed as per necessity in 2017-18 PIP
under line item B.10.7.3-To be printed & supplied from State
Printing of IUCD cards, MPA Card, FP manuals, guidelines
etc.HSS FP 0.00
12.2.4 A.2.8
12.3.4 B.10.7.3
Page 100 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Printing of MPA cards HSS FP Per card 10 0.00 0 0.00 1.Printing of MPA cards -To be printed & supplied from State
Printing of Client information card HSS FP Per card 2 0.00 0 0.002.Printing of Client information card -To be printed & supplied
from State
Printing of newer contraceptive register HSS FP Per register 70 0.00 0 0.003.Printing of newer contraceptive register -To be printed &
supplied from State
Handout on newer contraceptives for ASHA HSS FP Per handout 2 0.00 0 0.004.Handout on newer contraceptives for ASHA -To be printed
& supplied from State
Printing of IUCD Card HSS FP Per card 2 0.00 0 0.00 5.Printing IUCD card -To be printed & supplied from State
Printing of IUCD register HSS FP Per register 70 0.00 0 0.006.Printing of IUCD register -To be printed & supplied from
State
Printing of Client card for Female sterilization HSS FP Per card 2.9 0.00 0 0.007.Printing of Client card for Female sterilization @Rs.2.90 per
card x 175000 (ELA) = Rs.5.075 lakhs
Printing of Clinical Safety Checklist for Female sterilization HSS FP Per checklist 3.9 0.00 0 0.008.Printing of Clinical Safety Checklist for Female sterilization
@Rs.3.90 per checklist x 175000 (ELA) = Rs.6.825 lakhs
Printing of Sterilization Register for all operational fixed day
facilitiesHSS FP Per register 120 0.00 0 0.00
9.Printing of Sterilization Register for all operational fixed day
facilities -To be printed & supplied from State
Printing of Oral Pills Register for CHC and above institution HSS FP Per register 120 0.00 0 0.0010.Printing of Oral Pills Register for CHC and above institution -
To be printed & supplied from State
Any other (please specify) HSS FP 0.00
Printing of FP Counselling Flipbook and MEC Wheel HSS FP Per flipbook 300 0.00 0 0.00 To be printed & supplied from State
Printing of Centchroman and Missed pill posters HSS FP Per Poster 30 0.00 0 0.00 To be printed & supplied from State
12.4 Printing activities under AH 0.00
12.4.1 A.4.2.4 PE Kit and PE Diary RCH AH 0.00 0.00 Already available
12.4.2 B.10.7.2Printing under WIFS -WIFS cards, WIFS registers, reporting
format etcHSS AH 0.00 0.00 Already available
12.4.3 B.10.7.4.6Printing for AFHC-AFHC Registers, reporting formats, AFHC
cards etcHSS AH 0.00 0.00 Already available
Printing of AFHS Training manuals for MO, ANM and
Counsellor; ANM training manual for PE training HSS AH
AFHC Resource book for MOs HSS AH Per booklet 150 0.00 0 0.00 To be printed & supplied from State
Physician chart booklet for MOs HSS AH Per booklet 200 0.00 0 0.00 To be printed & supplied from State
12.4.5 Any other (please specify) HSS AH 0.00 0 0.00
Printing for
1. facilitator Guide for Master Trainers (Counselling
Training)-120
2.Prining of Counselling Resource Manual - 1150 (1021
participants in filed training + 120 Master Trainer + Buffer)
12.5 Printing activities under RBSK 0.59
12.5.1 A.5.1.1 Prepare and disseminate guidelines for RBSK RCH RBSK Per handbook 150 0.00 0 0.00 To be printed & supplied from State
12.4.4
12.3.5
12.3.4 B.10.7.3
Page 101 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
12.5.2 A 5.3.1 Training kits for teachers RCH RBSK Per kit 50 0.00 0 0.00
This is a state specific initiative to strengthen convergence
between S&ME Deppt & H&FW FDeptt for successful
implementation of RBSK Programme.The training is required
to orient one nodal teacher from each school on MHT
screening activities , Role of teachers , Follow up treatment of
identified children and linking identified Child with Special
Need (CWSN) with DEIC. Training will be imparted to
teachers at block level existing meeting @1 teacher per
school .
Total School-69287
Proposal :
Provision of Training kit @1 Kit per teacher.
Requirement- 69287 + 10% buffer= 76000 KIts
The Training kit contains RBSK training book for teachers,
Note book & Pen.
Cost include:
RBSK training book : Rs. 30/-
Pen & Note book: Rs 20/-
Budget Not Approved
12.5.3 A 5.3.2 School Kits RCH RBSK Per kit 125 0.00 0 0.00
(continuation of 12.5.2)
Total School-69287
School kit @1 Kit per School.
Requirement- 69287 + 10% buffer= 76000
During training to teachers, one school kit will be provided for
each School .
The School kit containes one poster on RBSK & DEIC services,
one RBSK register to register MHT visit details & follow up
plan of identified children, one vision screening chart &
Occluder.
Cost include:
One Poster on RBSK & DEIC services ( Vinyl) : Rs. 40/-
One Register- Rs.50/-
Vision chart with Occluder: Rs35/-
Budget Not Approved
12.5.4 B.10.7.4.3 Printing of RBSK card and registers HSS RBSK Per Team 800 0.01 24 0.19
1.For MHTs - printed screening registers per MHT for 636
MHTs to capture screening data from AWC & School.
2.Child wise screening card is available for screening
minimum 8 times of each child for proper tracking & follow
up.
12.5.5 B.10.7.4.4 Printing cost for DEIC HSS RBSK Per DEIC 40000 0.40 1 0.40 Printing of registers & case assessment formats
12.5.6 Any other (please specify) HSS RBSK 0.00 0.00 Budget shifted to 12.5.1 as per pre screening comments
Page 102 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
12.6 Printing activities under Training 0.00
12.6.1 A.9.2.1 Duplication of training materials RCH Training 0.00 0.00
12.6.2 Any other (please specify) RCH Training 0.00 0.00
12.7 Printing activities under ASHA 2.41
12.7.1 B1.1.3.7 Printing of ASHA diary HSS NHSRC-CP Per Diary 100 0.00 0 0.00 To be printed & supplied from State
12.7.2 Printing of ASHA Modules and formats HSS NHSRC-CP Per Module 100 0.00 0 0.00 Approval Pended.
12.7.3 Printing of CBAC format HSS NHSRC-CP 0.00 0.00
12.7.4 ASHA communication kit HSS NHSRC-CP 0.00 0.00
Any other (please specify) HSS NHSRC-CP 2.41
HBNC Format for ASHAs ( @ 25 formats per ASHA for 47147
ASHAs HSS NHSRC-CP Per Format 4 0.00 38575 1.54
ASHA SATHI Register HSS NHSRC-CP Per Register 50 0.00 82 0.04
Monthly meeting register HSS NHSRC-CP Per Register 50 0.00 47 0.02
Report cards for ASHA & ASHA SATHI HSS NHSRC-CP Per card 2 0.00 1635 0.03
Incentive voucher book HSS NHSRC-CPPer voucher
book50 0.00 1543 0.77
12.8 Printing activities under Blood services & disorders 0.00
12.8.1 B.10.7.4.5Printing of cards for screening of children for
hemoglobinopathiesHSS Blood cell 0.00 0.00
Each blood bank has been allotted cost for contingency &
consumables under State budget which shall be utilised for
this purpose.12.8.2 Any other (please specify) HSS Blood cell 0.00 0.00 To be met out of State Budget
12.9 Printing activities under HMIS/MCTS 0.35
12.9.1 B15.3.1.6 Printing of HMIS Formats HSS HMIS-MCTS Per page 1 0.00 34586 0.35
Printing of HMIS formats (Carbonated)
- At DHH/SDH level - 14 pages (7 pages for reporting & 7
pages carbonated for inst) per inst p.m x 12 months
- At CHC level - 16 pages (8 pages for reporting & 8 pages
carbonated for inst) per inst p.m x 12 months
- At PHC/UPHC/Other level - 12 pages (6 pages for reporting
& 6 pages carbonated for inst) per inst p.m x 12 months
- At SC level - 10 pages (5 pages for reporting & 5 pages
carbonated for inst) per inst p.m x 12 months
Quantity of pages includes buffer.
12.9.2 B15.3.2.1 Printing of RCH Registers HSS HMIS-MCTS 0.00 0.00 No proposal for current year.
12.9.3 B15.3.2.2Printing of MCTS follow-up formats/ services due list/ work
planHSS HMIS-MCTS 0.00 0.00 No proposal for current year.
12.9.4 Any other (please specify) HSS HMIS-MCTS 0.00 0 0.00
Printing of HMIS Operational manual/guideline for all
institutions.
Rural: SC - 6688 + PHC - 1287 + CHC - 374 + SDH - 32 + DHH -
32 + MCH - 7 + Urban: SC - 488 + + CHC - 374 + PHC - 87 =
9002 + Buffer - 998 = 10000 booklet.
Activity dropped as per the recommendation of NPCC/
Division
12.7.5
Page 103 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
12.10 Printing activities under Immunization 2.43
12.10.1 B.10.7.4.10Printing and dissemination of Immunization cards, tally
sheets, monitoring forms etc.HSS RI Per benificary 20 0.00 12126 2.43 Expected live birth - 845124 + buffer = 900000
Any other (please specify) HSS RI LumpsumThe activity approved, budget fo the same activity may be
met out from FMR. 12.10.1
Printing of IPC folder to frontline workers HSS RI Per folder 5 0.00 16711.Printing of IPC folder to frontline workers @Rs.5/- per
folder for 55000 folders = Rs.2.75 lakhs
Printing of invitation cards for lerftout and dropout children
for RI sertvicesHSS RI Per card 1 0.00 1600
2.Printing of invitation cards for leftout and dropout children
for RI sertvices @Re.1/- per card x 70000 cards = Rs.0.70
lakhs
Printing of Modules for BRIDGE HSS RI Per Module 15 0.00 0
3.Printing of Modules for BRIDGE @Rs.15/- per module x
45660 modules = Rs.6.849 lakhs (This activity will be carried
out for Malkangiri, Koraput, Gajapati, Rayagada, Balangir,
Sundergarh, Mayurbhanj, Sonepur and Nuapada in ist phase)
12.11 Printing activities under NVBDCP 0.00
12.11.1 F.1.4.a Printing of forms/registers for Lymphatic Filariasis DCP NVBDCP - LF 0.00 0.00 Already available
12.11.2 F.2.1.g Communication Material and Publications (CMP) - GFATM DCPNVBDCP -
GFATM0.00 0 0.00
Any other (please specify) DCPNVBDCP -
GFATM0.00
Printing Of Reporting Formats & Registers DCPNVBDCP -
GFATMLumpsum 8600000 86.00 0 0.00 To be printed & supplied from State
Printing Of Reporting Formats(M Register) for Malaria(State
Level) DCP
NVBDCP -
GFATMLumpsum 0.00 0.00 Expenditure incurred to be booked under FMR. 12.11.3
Printing of Guidelines & Formats for Dengue &
Chikungunya(State Level) DCP
NVBDCP -
GFATMLumpsum 0.00 0.00 Expenditure incurred to be booked under FMR. 12.11.3
12.12 Printing activities under NLEP 0.00
Printing works DCP NLEP 0.00
Printing of training manual DCP NLEP Per unit 100 0.00 0 0.00 To be printed & supplied from State
Printing of patient card DCP NLEP Per unit 3 0.00 0 0.00 To be printed & supplied from State
Printing of LPEP & MPR formats DCP NLEP Lumpsum 200000 2.00 0 0.00 To be printed & supplied from State
12.13 Printing activities under RNTCP 0.59
12.13.1 H.4 Printing (ACSM) DCP RNTCP 0.00 0.00 Already available
Printing DCP RNTCP 0.59
Printing at State level DCP RNTCP Lumpsum 300000 3.00 0 0.00 To be printed & supplied from State
Printing at District level DCP RNTCP Per Block 4936 0.05 12 0.59 For 31 RNTCP implementing units
12.14 Printing activities under NTCP 0.00
12.14.1 B.10.7.4.11 Printing of Challan Books under NTCP NCD NTCP 0.00 0.00 Already available
12.14.2 Any other (please specify) NCD NTCP Per Card 5 0.00 0 0.00Printing of Case Assessment Card for Tobacco users-To be
printed & supplied from State
12.15 Printing activities under NPCDCS 0.00
12.15.1 O.2.2.1.8.i Patient referral cards at PHC Level NCD NPCDCS 0.00 0.00To be met out of committed unspent balance available under
opportunistic & PBS districts approved in 2017-18
12.11.3
12.12.1 G.1.4
12.13.2 H.13
12.10.2
Page 104 of 280
Kandhamal_Printing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
12.15.2 O.2.2.1.8.ii Patient referral cards at Sub-centre level NCD NPCDCS 0.00 0.00To be met out of committed unspent balance available under
opportunistic & PBS districts approved in 2017-18
12.15.3Printing activities for Universal Screening of NCDs - printing of
cards and modulesNCD HSS/NPCDCS 0.00 0.00 Available with the State .Approved in last year.
12.15.4 Any other (please specify) NCD NPCDCS 0.00 0.00
12.16 Printing activities for H&WC 0.00
12.16.1 0.00 0.00
12.17 Other Printing activities 0.00
12.17.1 B.10.6.14.2 IEC/SBCC material used for patient counselling HSS HSS 0.00 0.00
Any other (please specify) 0.00
Printing of IDSP Reporting formats: DCP IDSP 0.00 0.00
Form P DCP IDSP Per unit 0.75 0.00 0 0.00
Form P (Health Institution- 1812) One book contains (3 pages
colour with 1 & 2 page perforated & top binding for 52
weeks) To be printed & supplied from State
Form S DCP IDSP Per unit 0.75 0.00 0 0.00
Form S (Sub Centre – 6688) One book contains (4 pages
colour with 1, 2 & 3 page perforated & top binding for 52
weeks).To be printed & supplied from State
Form L DCP IDSP Per unit 0.75 0.00 0 0.00
Form L (Laboratory 414) One book contains (2 pages colour
with 1 page perforated & top binding for 52 weeks) -To be
printed & supplied from State
Form EWS DCP IDSP Per unit 0.75 0.00 0 0.00Form EWS (50 sets) One book contains (4 pages for each
week for 52 weeks) -To be printed & supplied from State
12.17.2 Printing under National Health Protection Scheme HSS HSS Per block 20000 0.20 0 0.00Printing under National Health Protection Scheme-To be
printed & supplied from State
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 IDSP
5 NLEP
6 RNTCP
7 NVBDCP
8 NPCDCS
9 NTCP
12.17.2
Page 105 of 280
Kandhamal_Quality Assurance
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
13 Quality Assurance 27.21
13.1 Quality Assurance 9.05
Quality Assurance Implementation (for traversing gaps) HSS HSS/NHSRC 9.05
Support proposed under NHM: Budget proposed for EQAS,
Calibration & AERB approval for FRUs in the 1st phase.
Support under State budget : Untied fund @Rs.1.00 crore
per institution those have secured more than 60% score in
NQAS internal assessment validated by State QA Team.
Operational cost for EQAS HSS HSS/NHSRC Per FRU 2500 0.03 2 0.05 Charges to be paid to NABL accredited Lab for conducting
EQAS.
Cost for AERB approval HSS HSS/NHSRC Per FRU 100000 1.00 5 5.00
Target institutions where tele radiology services have been
initiated through PPP mode & fund for AERB certification not
approved last year.
Calibration of equipment & instrument for FRU HSS HSS/NHSRC Per FRU 200000 2.00 2 4.00 Agency will be selected through competitive bidding process
& payment will be released as per tender rate
Calibration of equipment & instrument for non FRU CHC/PHC
selected for NQASHSS HSS/NHSRC Per inst 50000 0.50 0 -
Agency will be selected through competitive bidding process
& payment will be released as per tender rate
Quality Assurance Assessment (State & district Level
assessment cum Mentoring Visit) certification & re
certification (State & National Level)
HSS HSS/NHSRC 0.00 Funds placed at State level
Cost of External Assessment (DH) HSS HSS/NHSRC Per Inst. 102000 1.02 0 -
Cost of External Assessment (SDH/CHC) HSS HSS/NHSRC Per Inst. 102000 1.02 0 -
Cost of External Assessment (Non FRU CHC/PHC) HSS HSS/NHSRC Per Inst. 88000 0.88 0 -
Cost of State Certification (DH) HSS HSS/NHSRC Per Inst. 69000 0.69 0 -
Cost of State Certification (SDH/CHC) HSS HSS/NHSRC Per Inst. 69000 0.69 0 -
Cost of State Certification (Non FRU CHC/PHC) HSS HSS/NHSRC Per Inst. 69000 0.69 0 -
Miscellaneous Activities (Incentives only) HSS HSS/NHSRC 0.00
NQAS Incentives for DH nationally certified HSS HSS/NHSRC Per bed 10000 0.10 0 - Funds kept at state level. Nationally certified intuitions will be
released fund as per norms on request of Quality Cell.
NQAS Incentives for SDH/CHC nationally certified HSS HSS/NHSRC Per inst. 300000 3.00 0 - Funds kept at state level. Nationally certified intuitions will be
released fund as per norms on request of Quality Cell.
NQAS Incentives for non FRU CHC/PHC nationally certified HSS HSS/NHSRC Per inst. 300000 3.00 0 - Funds kept at state level. Nationally certified intuitions will be
released fund as per norms on request of Quality Cell.
Sensitisation of service providers of 95 FRUs through
Continued Medical Education (4 CME per dist for
dissemination of quality protocols)
HSS HSS/NHSRC Per meeting 10000 0.10 0 -
Surveillance for 9 DHH for ISO 9001 : 2008 certification for 9
DHHsHSS HSS/NHSRC Per insts. 50000 0.50 0 -
13.1.3 B15.2.6
Annexure for Quality Assurance
13.1.1 B15.2.4
13.1.2 B15.2.5
Page 106 of 280
Kandhamal_Quality Assurance
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
13.1.4 Any other (please specify) HSS HSS/NHSRC Lumpsum
0
0.00 0.00
Facility level Quality Team Meeting (DQT, SDHQT, CHCQT) for
95 FRUs may be conducted as per approved norms and
booked under same head
13.2 Kayakalp 18.16
Assessments HSS HSS/NHSRC 1.66
Peer Assessment of DHs HSS HSS/NHSRC Per inst. 15000 0.15 1 0.15
Peer Assessment of SDH/CHCs HSS HSS/NHSRC Per inst. 3000 0.03 7 0.21
Peer Assessment of PHCs HSS HSS/NHSRC Per inst. 2000 0.02 15 0.30
External Assessment of DHs HSS HSS/NHSRC Per inst. 69000 0.69 0 -
External Assessment of SDHs/CHCs HSS HSS/NHSRC Per inst. 35000 0.35 0 -
External Assessment of PHCs HSS HSS/NHSRC Per inst. 10000 0.10 10 1.00
Kayakalp Awards HSS HSS/NHSRC 4.00
Award money for best District Hospital (Large State >10
Districts)HSS HSS/NHSRC Per inst. 5000000 50.00 0 -
Runner-up district hospital (Large State with 26 to 50 District
Hospitals)HSS HSS/NHSRC Per inst. 2000000 20.00 0 -
Award money for best SDH/CHC HSS HSS/NHSRC Per inst. 1500000 15.00 0 -
Award money for Runner-up SDH/CHC (Large State) HSS HSS/NHSRC Per inst. 1000000 10.00 0 -
Award for Best PHC for each districts HSS HSS/NHSRC Per inst. 200000 2.00 1 2.00
Commendation award DHs HSS HSS/NHSRC Per inst. 300000 3.00 0 -
Commendation award SDHs/CHCs HSS HSS/NHSRC Per inst. 100000 1.00 0 -
Commendation award PHCs HSS HSS/NHSRC Per inst. 50000 0.50 4 2.00
Support for Implementation of Kayakalp HSS HSS/NHSRC 2.50
Signage including Display of Quality Policy, Citizen’s Charter
etc. for non FRU CHC/PHCHSS HSS/NHSRC Per inst. 50000 0.50 0 - Budget to be met out of RKS fund
Pest Control Measures for DHH/SDH HSS HSS/NHSRC Lumpsum 200000 2.00 1 2.00 Budget Approved @ Rs. 1.00 Lakh per Per DHH/ SDH and @
Rs. 0.75 Lakh per FRU CHC
Pest Control Measures for non-fru CHC/PHC HSS HSS/NHSRC Per inst. 50000 0.50 1 0.50
13.2.4 B15.2.7.5 Contingencies HSS HSS/NHSRC 0.00 0.00
13.2.5 B15.2.7.6 Swachh Swasth Sarvatra HSS HSS/NHSRC Per CHC 1000000 10.00 1 10.00
Strengthening of CHC in ODF Block for achieving high level of
cleanliness to meet Kayakalp Standards (Rs. 10.00 Lakhs/ CHC
in ODF Block)
CHCs - One CHC in Kandhamal & 3 in Deogarh13.2.6 Any other (please specify) HSS HSS/NHSRC Lumpsum 1000000 10.00 0 0.00
13.3 Any other activity (please specify) 0.00
13.3.1 0.00 0.00
SL No Component Colour code
1 HSS
13.2.1 B15.2.7. 2
13.2.2 B15.2.7.3
13.2.3 B15.2.7.4
Page 107 of 280
Kandhamal_Drug Warehousing
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
14 Drug Warehousing and Logistics 49.92
14.1 B.17 Drug Ware Housing 2.26
14.1.1 B.17.1 Human Resources 1.54
Human Resources for Drug warehouses HSS HSS 1.54 Details at 16.8.PM Annex
At State Level HSS HSS
SDMU HSS HSS Lumpsum 1910264 19.10 0 0.00
State Equipment Maintenance Unit (SEMU) (State Unit +
zonal units(3))HSS HSS Lumpsum 3374677 33.75 0 0.00
At District Level HSS HSS 0.00 0.00
System In-charge HSS HSS 0.00 0.00
At KBK HSS HSS Per Month 18165 0.18 1 0.89
At Non-KBK HSS HSS Per Month 17365 0.17 0 0.00
Pharmacist (Logistic Assistant) HSS HSS Per Month 13530 0.14 1 0.66
14.1.1.2 B.30.1.7/H.12 Human resources for RNTCP drug store DCP RNTCP 0.00 0.00
14.1.1.3 Any other (please specify) DCP RNTCP 0.00 0.00
Other activities including operating cost etc. (please specify) HSS HSS 0.72
Management cost DWH at State level HSS HSS Per Annum 1200000 12.00 0 0.00
Management cost DWH at District level HSS HSS Per DWH P.A 72000 0.72 1 0.72
14.2 Logistics and supply chain 47.66
Supply chain logistic system for drug warehouses HSS HSS 3.60
State to Dist HSS HSS Per Annum 2400000 24.00 0 0.00
District to Block HSS HSS Per block P.A 18000 0.18 12 2.16
Block to Filed Institutions HSS HSS Per block P.A 12000 0.12 12 1.44
14.2.2 B15.3.3.1 Implementation of DVDMS HSS HSS 0.00 0.00
14.2.3 Implementation of FP-LMIS RCH FP 0.00 0.00
Alternative vaccine delivery in hard to reach areas RCH RI 12.32
Alternative vaccine delivery in hard to reach Area RCH RI Per session 200 0.00 4928 9.86
Alternative vaccine delivery in very hard to reach Areas RCH RI Per session 450 0.00 548 2.47
14.2.5 C.1.i Alternative Vaccine Delivery in other areas RCH RI Per session 90 0.00 6820 6.14
14.2.6 C.1.lPOL for vaccine delivery from State to district and from
district to PHC/CHCsRCH RI Lumpsum 186000 1.86 1 1.86
Transportation cost for Vaccine:
1. BBSR RVS to 10 Districts @ Rs. 3500/- Per month x 12
months x 10 = Rs. 4.20 Lakhs
2. Rs. 5.64 Lakhs has been kept at state level for
transportation of vaccine from State to 7 regional vaccine
store
2.RVS to DVS @ Rs. 3500/- Per month x 12 months x 14 DVS=
Rs. 5.88 Lakhs
3. DVS to Cold chain Points @ Rs. 300/- per month x 12
months x 1230 Cold chain points= Rs. 44.28 Lakhs
Cold chain maintenance RCH RI 0.99
Cold chain Maintenance at Dist RCH RI Per district 18750 0.19 1 0.19
14.2.4 C.1.h
14.2.7 C.4
14.2.1 B.17.2Transportation of programme drugs & logistics (hiring of
vehicles, POL & maintenance of institutional vehicle, labour
charges for loading, unloading etc.)
Annexure for Drug Warehouse and Logistics
14.1.1.1 B.17.1.1
14.1.2
Page 108 of 280
Kandhamal_Drug Warehousing
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Cold chain Maintenance at Cold Chain Point level RCH RI Per inst. 1000 0.01 40 0.40Cold chain Maintenance at Cold Chain Point level @Rs.1000/-
per PHC/CHC x 1814 insts including urban institutions
Cold chain Maintenance at SVS & RVS level RCH RI Per inst. 40000 0.40 1 0.40
Operational cost of e-VIN(like temperature logger sim card
and Data sim card for e-VIN)RCH RI 0.00
Data Sim Cards rental for Cold Chain Handlers / RVCCM/
DVLM/ SVLM & DD Immunisation RCH RI Per Person 3600 0.04 0 - State to supply as per requirement
Data Sim Cards rental for Temperature Loggers RCH RI Per logger p.a. 3600 0.04 0 - State to supply as per requirement
Replacement of Temperature loggers RCH RI Per logger 10000 0.10 0 - State to supply as per requirement
Replacement of Mobile handset RCH RI Per handset 8000 0.08 0 - State to supply as per requirement
14.2.9 F.2.1.d Supply Chain Management cost under GFATM CD NVBDCP 0.00 0.00 To be met out of state budget
14.2.10 H.7 Vehicle Operation (POL & Maintenance) CD RNTCP 0.00 0.00
14.2.11 H.8 Vehicle hiring CD RNTCP 0.00 0.00
Drug transportation charges CD RNTCP 0.18
State Drug Store CD RNTCP Per month 50000 0.50 0 0.00
Transportation charges from State Drug Store to District Drug
Store& peripheryCD RNTCP Per month 1500 0.02 12 0.18
Any other (please specify) HSS HSS 22.57 Modernisation of Drug warehouses at various levels
Drug ware house at State & district level HSS HSS 0.00 0 0.00 Already provisioned in NHM PIP in previous years
Drug ware house at SDH level HSS HSS Per SDH 900000 9.00 1 9.00
Equipment for DWH at Block Level HSS HSS 13.57 Specification will be shared by the State
Pallets HSS HSS Per Unit 3000 0.03 48 1.44
Aluminium ladder HSS HSS Per Unit 6000 0.06 24 1.44
Thermo-hygrometer HSS HSS Per Unit 600 0.01 72 0.43
Fire extinguisher HSS HSS Per Unit 8000 0.08 72 5.76
ILR& Cold Box HSS HSS Per Unit 0.00 0 0.00 In kind from GoI
DG set for power back up HSS HSS Per Unit 450000 4.50 1 4.50
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 RNTCP
5 NVBDCP
14.2.12 H.11
14.2.13
14.2.7 C.4
14.2.8 C.1.u
Page 109 of 280
Kandhamal_PPP
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
15 PPP 194.68
15.1 PPP under Family Planning 0.00
15.1.1 A.3.1.5Processing accreditation/empanelment for private
facilities/providers to provide sterilization services RCH FP 0.00 0.00
15.1.2 Any other (please specify) RCH FP 0.00 0.00
15.2 PPP under NPPCD 0.00
15.2.1 B.25.1.2 Public Private Partnership HSS NPPCD 0.00 0.00
15.3 PPP under NVBDCP 0.00
15.3.1 F.1.1.e PPP / NGO and Intersectoral Convergence DCPNVBDCP -
MalariaPer bed net 10 0.00 0 0.00
Scheme - Impregnation of Bed nets
Targeted 6 districts i.e. Bargarh, Cuttack, Ganjam, Jajpur,
Jharsuguda, Khurda basing on low malaria endemicity and
further rationale that they are not covered under LLIN or IRS.
15.3.2 F.1.2.g Inter-sectoral convergence DCP
NVBDCP -
Dengue
Chikungunya
0 0.00 Non budgeted activity
15.4 PPP under NLEP 1.50
NGO - Scheme DCP NLEP 1.50
Scheme-1 DCP NLEP Lumpsum 975000 9.75 0 0.00 Scheme-1 (Designated Referral Centres (DRC 1 C)
Scheme-3 DCP NLEP Per Scheme 150000 1.50 1 1.50Scheme 3 Contact Survey and Home based Self-care in the
low endemic districts with high endemic Blocks.
Scheme-4 DCP NLEP Per Scheme 225000 2.25 0 0.00 Scheme 4 Disability Care Centre The Scheme
15.4.2 Any other (please specify) DCP NLEP 0.00 0.00
15.5 PPP under RNTCP 0.11
Public Private Mix (PP/NGO Support) DCP RNTCP 0.11
ACSM Activities at community level DCP RNTCPPer One Lakh
Popn.25000 0.25 43905 0.11
DMC (A) DCP RNTCP Per slide 40 0.00 0 0.00
DMC -cum- treatment Centre DCP RNTCP Per Unit 434000 4.34 0 0.00
Improving TB control in Urban slum DCP RNTCP Lumpsum 1683000 16.83 0 0.00
Targeted City: Bhubaneswar Slum Area
Total Slum Population: 6.60 lakhs
Cost norm as per CTD : Rs.75000/- per 35000 population +
Rs.1500/- incentive for min of 15 cases + mgt cost 15%
LT scheme (Strengthening diagnostic services) DCP RNTCP Per Project 170135 1.70 0 0.00 LT scheme (Strengthening diagnostic services)
15.5.2 Public Private Support Agency (PPSA) DCP RNTCP 0.00 0.00Note: ACF activity projected under Innovation (New FMR-
18.5)
15.6 PPP under NPCB 10.00
15.6.1 I.1.1Reimbursement for cataract operation for NGO and Private
Practitioners as per NGO norms @Rs.1000/-NCD NPCB Per Surgery 2000 0.02 500 10.00
Annexure for PPP
15.4.1 G.1.5
15.5.1 H.9
Page 110 of 280
Kandhamal_PPP
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
15.6.2 I.1.2 Other Eye Diseases 0.00District to submit detailed plan for release of fund under this
head
15.6.2.1 Diabetic Retinopathy @Rs.1500/- NCD NPCB
Per cases
treated /
managed
2000 0.02 0 0.00
15.6.2.2 childhood Blindness @Rs.1500/- NCD NPCB
Per cases
treated /
managed
2000 0.02 0 0.00
15.6.2.3 Glaucoma @Rs.1500/- NCD NPCB
Per cases
treated /
managed
2000 0.02 0 0.00
15.6.2.4 Keratoplastiy @Rs.5000/- NCD NPCB
Per cases
treated /
managed
7500 0.08 0 0.00
15.6.2.5 Vitreoretinal Surgery @Rs.5000/- NCD NPCB
Per cases
treated /
managed
10000 0.10 0 0.00
15.6.3 I.2.3Non-recurring grant-in-aid for Vision Centre (PHC) (Govt. +
NGO) @ Rs.1 lakh NCD NPCB
Per Vision
Center100000 1.00 0 0.00
15.6.4 I.2.6For GIA to NGOs for setting up/expanding eye care unit in
semi-urban/ rural area @ Rs.40 lakhNCD NPCB Per NGO 4000000 40.00 0 0.00
15.6.5 Any other (please specify) NCD NPCB 0.00 0.00
15.7 PPP under NMHP 0.00
15.7.1 NGO based activities NCD NMHP 0.00 0.00
15.8 O.2.6 PPP (NGO, Civil Society, Pvt. Sector) under NPCDCS 0.00
15.8.1 O.2.6.1 PPP at State NCD Cell NCD NPCDCS 0.00 0.00
15.8.2 O.2.6.2 PPP at District NCD Cell / Clinic NCD NPCDCS 0.00 0.00
15.8.3 O.2.6.3 PPP at CHC NCD Clinic NCD NPCDCS 0.00 0.00
15.8.4 Any other (please specify) NCD NPCDCS 0.00 0.00
15.9 Other PPP 183.07
15.9.1 B13.1 Non governmental providers of health care RMPs HSS HSS 0.00 0.00
15.9.2 B13.2Public Private Partnerships (Out Sourcing set up, if applicable
for State, to be budgeted under this head)HSS HSS Per PHC(N) 2172053 21.72 6 130.32
NGO Programme/ Grant in Aid to NGO HSS HSS 0.00
Pool-HSS, Prog. Div-AH
Activity : Strengthening peer education programme in 2
targeted districts through intensive monitoring & mentoring
by credible NGOs in the field.
HR cost for Block Supervisors HSS HSS
Per
supervisior/
PM
10500 0.11 0 0.00 Budgeted for 8 Months
TA/ DA for Block Supervisors HSS HSS Per visit 200 0.00 0 0.00
3 days Orientation training of Block supervisors HSS HSS Per session 1000 0.01 0 0.00
Communication expenses HSS HSS Per Month 250 0.00 0 0.00
Adminstratative cost HSS HSS Lumpsum 0 0.00 1 0.00
15.9.3 B13.3
Page 111 of 280
Kandhamal_PPP
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Pradhan Mantri National Dialysis Programme HSS HSS 52.74
CAPEX HSS HSS 0.00 1 0.00
OPEX HSS HSS
Service charges HSS HSS Per Session 869 0.01 5040 43.80
Procedure cost HSS HSS 8.95
AV Fistula HSS HSS Per Unit 2300 0.02 50 1.15
AV shunt HSS HSS Per Unit 3500 0.04 50 1.75
Jugular Catherisation HSS HSS Per Unit 1500 0.02 403 6.05
Medicine HSS HSS 0.00 1 0.00 Erithyro Poeitin & Iron Sucrose - Met out of State budget
15.9.5 B14.1 Intersectoral convergence HSS HSS 0.00 0.00
15.9.6 B18.3 Strengthening of diagnostic services of H&WC through PPP HSS HSS 0.00 0.00
15.9.7 Any other (please specify) 0.00 0.00
SL No Component Colour code
1 RCH
2 HSS
3 NLEP
4 RNTCP
5 NVBDCP
6 NPCB
7 NPCDCS
8 NMHP
9 NPPCD
15.9.4 B.13.4(AV Fistula, AV shunt, Jugular Catherisation)
New cases for surgical procedures
Page 112 of 280
Kandhamal_Prog.Management
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16 Programme Management 388.49
16.1 Planning Activities 111.92 Total fund approved under FMR(16.1+16.2+16.3+16.4+16.7)
Health Action Plans 0.44
16.1 B7.1 State HSS HSS Lumpsum 1500000 15.00 0 0.00
Head of expenses :
1.Orientation of planning teams of district level
2.Planning meetings at state level (technical sub-committee
meetings & appraisal committee meetings)
3.Disssimination of approved PIP with state & district level
programme officers
4.Printing of state & district PIPs
Budget proposed as per last year's approval.
16.1 B7.2 District HSS HSS Per dist 20000 0.20 1 0.20
Head of expenses:
1.Consultation meetings with programme officers & other
stake holders
2.Printing of block PIPs
3.Dissemination workshop/s
Budget proposed as per last year's approval.
16.1 B7.3 Block HSS HSS Per block 2000 0.02 12 0.24
Head of expenses:
1.Planning meetings at selected village level (Min 2 per
blocks) for preparation of village PIP 2018-19
2.Sharing meeting at village level where village consultation
meetings taken up during 2016-17 as part of preparation of
village PIP 2017-18
Budget proposed as per last year's approval.
16.1 A.2.1
IMNCI (including F-IMNCI; primarily budget for planning for
pre-service IMNCI activities in medical colleges, nursing
colleges, and ANMTCs other training)
RCH CH 0.00 0.00
16.1 A.5.1.1 Prepare and disseminate guidelines for RBSK RCH RBSK 0.00 0.00 Already prepared & communicated
16.1 A.5.1.2Prepare detailed operational plan for RBSK across districts
(including cost of plan)RCH RBSK 0.00 0.00 Already prepared & communicated
16.1 A.11.1Planning, including mapping and co-ordination with other
departmentsRCH
Vulnerable
Groups0.00 0.00
16.1 C.1.j To develop microplan at sub-centre level RCH RI Per SC 100 0.00 176 0.18 6688 Rural SC + 488 in focused 36 urban cities
16.1 C.1.k For consolidation of micro plans at block level RCH RI 0.00 0.00 Cost to be met out of prog. Mgt. cost
16.1 J.1.1 Preparatory phase : Development of district plan NCD NMHP 0.00 0.00
No additional cost proposed. Fund required for the purpose
will be met out of Budget head Health Action Plan - State,
district & block.
Others (Viral Hepatitis) HSS HSS 0 0.00 0.00 0.00
Consumables HSS HSS Lumpsum 500000 5.00 0 0.00
Meetings/Trainings etc. HSS HSS Lumpsum 600000 6.00 0 0.00
16.2 Monitoring & Data Management 15.31
Meetings, Workshops and Conferences 8.96
Annexure for Programme Management
16.1
Page 113 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.2 A.2.11.1Provision for State & District level (Meetings/ review
meetings)RCH CH Per review 250000 2.50 0.00
16.2 Review/orientation meetings for HBNC RCH CH 0.00 0.00
16.2Review/orientation meetings for Micronutrient
supplementation programmeRCH CH 0.00 0.00
16.2 A.3.5.1
FP QAC meetings (Minimum frequency of QAC meetings as
per Supreme court mandate: State level - Biannual meeting;
District level - Quarterly)
RCH FP Per meeting 1000 0.01 4 0.04
District level : To be taken up quarterly once as per mandate
& as & when required as per need. Urban Area Interventions
in 5 corporation cities & Puri will be facilitated by PSI
16.2 A.3.5.2 FP review meetings (As per Hon'ble SC judgement) RCH FP Per meeting 100000 1.00 0 0.00
16.2 A.4.1.1 Review meetings/ workshops under RKSK RCH AH Per review 1000000 10.00 0 0.00
1.Regional review proposed in the current year in
consultation with GoI Officials.
2.Review meeting at State & district level - Integrated with
existing reviews (Budgeted under Workshops and
Conferences)
16.2 A.5.1.2 RBSK Convergence/Monitoring meetings RCH RBSK Per Meeting 30000 0.30 4 1.20
Quarterly convergence & review meeting of RBSK activities
planned with participation of line departments (School &
Mass education, ICDS, SC&ST department, Health, DEIC &
MHTs under the chairpersonship of Collector & District
Magistrate.
Along with convergence issues, MHT /Block wise performance
and Disease wise treatment under RBSK to be reviewed &
action plan for proper implementation of RBSK activities to be
prepared in the proposed meeting.
Total Budget proposed as per last years approval
Unit cost- Rs.30000/- per meeting per DEIC per quarter x 4
meetings in a year.
Workshops and Conferences RCH RCH 3.36Workshop & Conferences proposed for all levels i.e. State,
district & block.
Review meetings at State level RCH RCH
PMU meetings RCH RCH
One day Review Meeting of DPM (30 participants + 10
facilitators) RCH RCH Per meeting 60000 0.60 0 -
One day Review Meeting of DAM (30 participants + 10
facilitators) RCH RCH Per meeting 60000 0.60 0 -
One day Review Meeting of Engineering Consultants (30
participants + 10 facilitators) RCH RCH Per meeting 60000 0.60 0 -
One day Review Meeting of AM ASHA/GKS (60 participants +
10 facilitators) - 2 batchesRCH RCH Per meeting 60000 0.60 0 -
One day Review Meeting of DM RCH (30 participants + 10
facilitators) RCH RCH Per meeting 60000 0.60 0 -
One day Review Meeting of HM (35 participants + 10
facilitators)RCH RCH Per meeting 60000 0.60 0 -
Thematic area meetings RCH RCH
16.2 A.10.4.1
Page 114 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Two days RCH review (MH + CH + FP + ARSH + QA) (3/district
x 30 dists = 90 per + 10 facilitators per batch x 2 days) RCH RCH Per meeting 145000 1.45 0 -
One day Training review meeting (2/district x 30 dists = 60
per + 10 facilitators) - 2 batchesRCH RCH Per meeting 60000 0.60 0 -
One day review meeting of NGO programmes (PHC mgt.,
MWH on rotation basis) implemented under PPP mode RCH RCH Per meeting 60000 0.60 0 -
One day IEC/BCC review (2 persons per district x 30 districts =
60 persons + 10 facilitators per batch) RCH RCH Per meeting 67500 0.68 0 -
Two days CDMO conference (1 person per district x 30
districts = 30 persons + 20 facilitators per batch x 2 days) RCH RCH Per meeting 90000 0.90 0 -
Review meetings at District level RCH RCH
One day District level Monthly programme review meeting
(MO, BPM, APHCO, CDPO, DQAC) and other Statutory
meetings, Technical meetings etc.
RCH RCHPer meeting
per block20000 0.20 12 2.40
One day Monthly BPM/BAM meeting RCH RCHPer meeting
per block2000 0.02 12 0.24
Review meetings at Block level RCH RCHPer meeting
per block6000 0.06 12 0.72
16.2 B1.1.1.4.2Monthly Review meeting of ASHA facilitators with BCM at
block level-Meeting Expenses HSS ASHA
Per ASHA
SATHI 3000 0.03 74 2.22
Meeting proposed at district level & once in a month.
Budget - @Rs.250/- (Rs.150/- for fooding & Rs.100/- for TA)
per ASHA SATHI p.m. for 12 months
16.2 B15.2.1 State Quality Assurance Unit (Review meeting) HSS HSS 0.00 0.00
16.2 B15.2.2 District Quality Assurance Unit (Review Meeting) HSS HSS 0.00 0.00 To be met out of DPMU prg. Mgt cost
16.2B.29.1.7,
B.29.2.4
NPPCF Coordination Meeting (Newly Selected Districts and
On-going Districts)HSS NPPCF Per District 60000 0.60 0 0.00
Proposed quarterly meeting for 3 ongoing districts for 3
quarters @ Rs. 0.60 Lakhs per district
16.2 C.1.cSupport for Quarterly State level review meetings of district
officerRCH RI Per participant 1500 0.02 0 0.00
16.2 C.1.dQuarterly review meetings exclusive for RI at district level
with Block MOs, CDPO, and other stake holdersRCH RI Per Participant 150 0.00 300 0.45
16.2 C.1.e Quarterly review meetings exclusive for RI at block level RCH RI Per Participant 100 0.00 1694 1.69Rs. 75/- Per Person as honorarium for ASHA and Rs. 25/- per
Person at the disposal fo MO I/c. for meeting expense.
16.2 E.4.2 IDSP Meetings CD IDSP Per meeting 50000 0.50 0 0.00
16.2 F.1.4.aState Task Force, State Technical Advisory Committee
meeting, District coordination meeting (Lymphatic Filariasis)CD NVBDCP Per District 5000 0.05 0 0.00 DCC meeting (5000/-per Meeting per District for 7 Districts)
16.2 F.4 GFATM Review Meeting CD NVBDCP 0.00 0.00
16.2 G.4.2 NLEP Review Meetings CD NLEP Per Meeting 50000 0.50 0 0.00
16.2 A.10.4.1
Page 115 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Medical Colleges (Any meetings) CD RNTCP 0.00
Core Committee Meetings and CMEs CD RNTCP Per Meeting 1000 0.01 0 0.00
RS. 1000/- per meeting per Quarter x 7 Medical colleges
SCB MCH, MKCG MCH, VSS MCH, PRM MCH Koraput, AIIMS,
SUM, KIIMS BBSR
Sponsorship of plenary session on RNTCP in seminars / CME
/WorkshopsCD RNTCP Per MCH 10000 0.10 0 0.00
SCB MCH, MKCG MCH, VSS MCH, PRM MCH Koraput, AIIMS,
SUM, KIIMS BBSR
Support to Conferences, symposiums, panel discussions and
workshops organized at National and state levels and at level
of Medical college
CD RNTCP Per Activity 100000 1.00 0 0.00
For attending STF/ZTF/NTF/State OR and Zonal OR
Committee meetingsCD RNTCP Lumpsum 50000 0.50 0 0.00
Organizational cost for STF Meeting CD RNTCP Lumpsum 50000 0.50 0 0.00
Operational Research Committee Meeting CD RNTCP Lumpsum 50000 0.50 0 0.00
Postage, communication, fax, etc CD RNTCP Lumpsum 5000 0.05 0 0.00
16.2 M.2.1.2 Monthly meeting with the hospital staff NCD NTCP 0.00 0.00
16.2 Others 0.00
Monitoring, Evaluation and Supervision 6.35
16.2 A.2.4.2 Monitoring and Award/ Recognition for MAA programme RCH CH Per Inst 100000 1.00 0.00
16.2 B.10.6.4 Monitoring of IEC/ BCC Activities HSS HSS: IEC Per visit 8000 0.08 4 0.32
16.2 B15.2.1 State Quality Assurance Unit (Monitoring & Supervision) HSS HSS 0.00 0.00 Integrated with PMU prog. Mgt. cost
16.2 B18.3Independent Monitoring Cost for performance assessment of
Health & Wellness Centre (H&WC)HSS HSS Lumpsum 35341000 353.41 0 0.00
Monitoring, Evaluation and Supervision under NVBDCP
Monitoring , Evaluation & Supervision (Malaria) CD NVBDCP 0.10
For CUG Connection CD NVBDCP Per CUG 2700 0.03 0 0.00
Technical task force committee meet for malaria elimination
at State LevelCD NVBDCP Lumpsum 50000 0.50 0 0.00
Technical task force committee meet for malaria elimination
at District LevelCD NVBDCP Per District 10000 0.10 1 0.10
Monitoring/supervision and Rapid response (Dengue and
Chikungunya)CD NVBDCP 0.26
At State Level CD NVBDCP Lumpsum 200000 2.00 0 0.00
At District Level CD NVBDCP Per District 2000 0.02 1 0.02
At Block Level CD NVBDCP Per Block 2000 0.02 12 0.24
Monitoring and supervision (JE/ AE) CD NVBDCP 0.27
Mobility cost for field visit , Review Meeting & Reporting cost
etc at Block levelCD NVBDCP Per block 2000 0.02 12 0.24
Mobility cost for field visit , Review Meeting & Reporting cost
etc at State levelCD NVBDCP Lumpsum 200000 2.00 0 0.00
Containment of Out break including CSF & Serum
transportation costCD NVBDCP Lumpsum 3000 0.03 1 0.03
16.2 F.1.3.d
16.2 H.10
16.2 F.1.1.dTechnical task force committee meeting will be conducted
twice in a year
16.2 F.1.2.c
Page 116 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Monitoring & Supervision (Lymphatic Filariasis) CD NVBDCP 0.00
At State Level CD NVBDCP Lumpsum 530000 5.30 0 0.00
At District Level CD NVBDCP Per District 10000 0.10 0 0.00
At Block Level CD NVBDCP Per Unit 4500 0.05 0 0.00
16.2 F.1.5.d Monitoring & Evaluation (Kala Azar) CD NVBDCP 0.00 0.00
16.2 Miscellaneous (Monitoring) 0.00 0.00
16.2 O.2.2.1.1 State NCD Cell NCD NPCDCS Lumpsum 500000 5.00 0 0.00
16.2 O.2.2.1.2 District NCD Cell NCD NPCDCS Per District 100000 1.00 1 1.00
Total approval in 2017-18 Rs.2.00 lakhs per district.
Budgeted in 2018-19 : Rs.1.00 lakhs per district under 16.2 +
Rs.0.50 lakhs per district under 16.3 + Rs.0.50 lakhs per
district under 16.4 as expenditure on the head is reported to
below.
Supervision and Monitoring CD RNTCP 4.38
At State Level CD RNTCP 0.00
Supervision and Monitoring (including mobility, TA/DA for
contractual & regular Staff)CD RNTCP Per Month 150000 1.50 0 0.00
Expenditure in relation to State IE- 10 nos, CIE- 1 nos, Any
Central Govt. Monitoring.etc.CD RNTCP Lumpsum 800000 8.00 0 0.00
Review meeting CD RNTCP Per Meeting 100000 1.00 0 0.00
Provision of CUG phone & operating cost for tablets to RNTCP
staffCD RNTCP Per unit 3000 0.03 0 0.00
At Dist Level CD RNTCP 4.38
Supervision and Monitoring CD RNTCP Per unit 35000 0.35 12 4.20
Additional Travel allowance to TBHV CD RNTCP Per month 1500 0.02 12 0.18
16.2 M.1.3.2 Monitoring Committee on Section 5 NCD NTCP Per Meeting 1000 0.01 2 0.02
16.2 Others 0.00 0.00
16.3 Mobility Support 61.25
State 15.62
Mobility Support for SPMU/State RCH RCH 0.00
Dist Nodal Officer - Officers above the rank of Addl. Director
are appointed as DNO. RCH RCH Per qtr 90000 0.90 0 -
Integrated Monitoring Team RCH RCH Per qtr 250000 2.50 0 -
Domain Specialist by Prog. Officers RCH RCH Per qtr 90000 0.90 0 -
Attending different meetings/ workshops at National level RCH RCH Per qtr 150000 1.50 0 -
16.3 A.4.1.4Mobility and communication support for RKSK district
coordinator/ consultantRCH AH
Per dist per
annum120000 1.20 0 0.00
Provision is for 2 selected RKSK districts where all
recommended package of RKSK services are being
implemented for intensive monitoring by mid level
supervisors like AYUSH Doctors, Supervisors etc.
Recommendation by division @Rs. 250/- per visit up to
maximum 8 visits i.e. Rs.2000/- per district, will not be
sufficient for movement by a district level managers
16.3 B6.2Mobility Support for Implementation of Clinical Establishment
Act HSS HSS 0.00 0.00
16.2 F.1.4.a
16.2 H.19
16.3 A.10.7.1
Page 117 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.3 B1.1.5.4Mobility Costs for ASHA Resource Centre/ASHA Mentoring
Group (Kindly Specify)HSS ASHA 0.00 0.00 Integrated with PMU mobility cost.
Mobility support for supervision at State level RCH RI 0.00
Mobility support for supervision at State level RCH RI Lumpsum 540000 5.40 0 0.00
Travel Cost for State & Regional Level e-VIN officers RCH RI Per Month 35000 0.35 0 0.00
16.3 C.2.3 Mobility support for staff for E-Vin (VCCM) RCH RI Per DVS p.a. 60000 0.60 0 0.00 Budget shifted to old FMR C.1.a
16.3 E.4.1
MOBILITY: Travel Cost, POL, etc. during outbreak
investigations and field visits for monitoring programme
activities at SSU on need basis
DCP IDSP Per month 40000 0.40 0 0.00Proposal for 2018-19:
For State Surveillance Unit , budget proposed @ Rs. 40,000/-
per month x 12 months
Monitoring , Evaluation & Supervision & Epidemic
Preparedness (Only Mobility Expenses)DCP NVBDCP 6.90
Hiring of Vehicles for Field visits/DOL/POL at State Level DCP NVBDCP Lumpsum 1500000 15.00 0 0.00
Hiring of Vehicles for Field visits/DOL/POL(Rs.) at District Level DCP NVBDCP Per Block 30000 0.30 12 3.60
POL/DOL for VBDTS DCP NVBDCP Per VBDTS 30000 0.30 11 3.30
16.3 F.1.4.a Mobility support for Rapid Response Team DCP NVBDCP 0.00 0.00
GFATM Project: Travel related Cost (TRC), Mobility DCP NVBDCP 6.90
TA/ DA for State Level DCP NVBDCP Lumpsum 2000000 20.00 0 0.00
TA/ DA for District Level DCP NVBDCP Per Block 30000 0.30 12 3.60
TA/ DA for VBDTS DCP NVBDCP Per VBDTS 30000 0.30 11 3.30
16.3 G.4.1.a Travel expenses - Contractual Staff at State level DCP NLEP Lumpsum 100000 1.00 0 0.00
16.3 G.4.5.a Mobility Support: State Cell DCP NLEP Lumpsum 400000 4.00 0 0.00
Vehicle Operation (POL) DCP RNTCP 1.66
For ATD&TC, Cuttack DCP RNTCP Lumpsum 210000 2.10 0 0.00
For DTO DCP RNTCP Per unit 150000 1.50 1 1.50
For MOTC DCP RNTCP Per unit 8000 0.08 2 0.16
Vehicle hiring DCP RNTCP 0.16
Vehicle hiring and other Travel cost at STC DCP RNTCP Per Month 30000 0.30 0 0.00
Additional Vehicle hiring cost for DTOs DCP RNTCP Per Month 5000 0.05 1 0.05
Additional Vehicle hiring cost for MOTCs DCP RNTCPPer vechile per
day1250 0.01 9 0.11
16.3 M.2.2.1 Tobacco Cessation Centre (TCC): Mobility support NCD NTCP 0.00 0.00
M.3.3 State Tobacco Control Cell (STCC): Mobility Support 0.00
16.3 M.3.3.1 Mobility of Enforcement Squad NCD NTCP 0.00 0.00 Proposed Under line item: Enforcement Squads M.1.3.3
16.3 M.3.3.2 Hiring of Operational Vehicle under NTCP* NCD NTCP Lumpsum 100000 1.00 0 0.00
16.3 O.2.2.1 State NCD Cell (TA,DA, POL) NCD NPCDCS Lumpsum 300000 3.00 0 0.00
16.3 Others 0.00 0.00
Regional 0.00
Zonal Entomological units CD NVBDCP 0.00
For Cuttack & Berhampur CD NVBDCP Per unit 50000 0.50 0 0.00
For State level CD NVBDCP Lumpsum 1050000 10.50 0 0.00
16.3 Others 0.00 0.00
16.3 C.1.b
16.3 F.1.1.d
16.3 F.2.1.b, F.4
16.3 H.7
16.3 H.8
16.3 F.1.1.g
Page 118 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
District 20.82
16.3 A.3.5.4PM activities for World Population Day’ celebration (Only
mobility cost): funds earmarked for district level activitiesRCH FP 0.00 0.00
16.3 A.3.5.5PM activities for Vasectomy Fortnight celebration (Only
mobility cost): funds earmarked for district level activitiesRCH FP 0.00 0.00
16.3 A.10.7.2 Mobility Support for DPMU/District RCH PM Per district 720000 7.20 1 7.20
16.3 B6.2Mobility Support for Implementation of Clinical Establishment
Act HSS HSS 0.00 0.00
16.3 B1.1.5.4Mobility Costs for ASHA Resource Centre/ASHA Mentoring
Group (Kindly Specify)HSS ASHA 0.00 0.00
16.3 B.29.1.2 Travel costs under NPPCF HSS NPPCF Per District 60000 0.60 0 0.00 Proposed for 3 ongoing districts
16.3 C.1.a Mobility Support for supervision for district level officers. RCH RI Lumpsum 367104 3.67 1 3.67
1. Travel cost for RVCCM @ Rs. 30000/- Per DVS per annum x
30 DVS= Rs. 9.00 Lakhs
2. Travel cost of DVLM to strengthen e-VIN operation @ Rs.
6000/- per block Per annum x 314 Blocks= Rs. 18.84 Lakhs
3. Travel cost of DVLM to strengthen e-VIN operation for
RGH & Capital Hospital @ Rs. 32000/- each x 2= Rs. 0.64 Lakhs
4. Travel cost for district level officers @ Rs. 19592.00 per
annum x 314 Blocks= Rs. 61.52 Lakhs
16.3 E.4.1
MOBILITY: Travel Cost, POL, etc. during outbreak
investigations and field visits for monitoring programme
activities at DSU on need basis
CD IDSP Per Block 6000 0.06 12 0.72For Dist. Surveillance Unit @ Rs. 500/- Per Block per Month
16.3 F.1.1.dMonitoring , Evaluation & Supervision & Epidemic
Preparedness (Only Mobility Expenses)DCP NVBDCP 0.00 0.00 Already proposed in F.1.1.d(State)
16.3 G.4.1.b Travel expenses - Contractual Staff at District level DCP NLEP Lumpsum 20800 0.21 1 0.21
16.3 G.4.5.b Mobility Support: District Cell DCP NLEP Lumpsum 72120 0.72 1 0.72
16.3 H.10Medical Colleges (All service delivery to be budgeted under
B.30)CD RNTCP 0.00 0.00
16.3 J.1.7 Miscellaneous/ Travel NCD NMHP Per District 420000 4.20 1 4.20
Mobility support for DMHP staff, fixed day services at CHC,
DLTMC meeting. & Hiring charges for psychiatrist/ clinical
psychologist from pvt. Sector etc.
16.3 M.1.3.3 Enforcement Squads NCD NTCPPer Squad/
Per Visit3000 0.03 24 0.72
The Enforcement Squad constituting of enforcement officials
like Food safety Officer, Drug Inspector, Sub Inspector of
Police & Excise Inspector. The squad will move to block for
look into the violation of the COTPA. This flying squad will
take-up at least 2 enforcement per month. The TA/ DA and
DOL for this squad shall be met out of this fund.
16.3 M.1.4.3 District Tobacco Control Cell (DTCC): Mobility Support NCD NTCP Per District 80000 0.80 1 0.80
16.3 O.2.2.1 District NCD Cell (TA,DA, POL) NCD NPCDCS Per District 50000 0.50 1 0.50
Page 119 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Others RCH 2.08
Strengthening WIFS RCH CH (Nutrition) Per visit 150 0.00 1372 2.06
Special mentoring by AYUSH Doctor in 3 selected districts
(Approved last year)
A focused monitoring and handholding system for improving
the coverage and compliance at schools and AWCs is being
proposed. All the AYUSH Doctors (posted at CHC/PHC have
already been trained
Plan-
- Monthly each AYUSH doctor will visit 2 AWCs and 2 schools
in 2 visits p.m. as per micro plan developed at block level.
- Quarterly Analysis of monitoring checklist will be done by
DDM.
- All the analysed data will be presented in the convergence
meeting at district/block level for corrective action
Strengthening quality assurance measures by facility audits &
exist interview by DQAC members (non officio members) RCH FP Per visit 1000 0.01 2 0.02
Block 24.81
16.3 A.3.5.4PM activities for World Population Day’ celebration (Only
mobility cost): funds earmarked for block level activitiesRCH FP 0.00 0.00 To be met out of mobility cost at PMU level
16.3 A.3.5.5PM activities for Vasectomy Fortnight celebration (Only
mobility cost): funds earmarked for block level activitiesRCH FP 0.00 0.00 To be met out of mobility cost at PMU level
Mobility Support - BPMU/Block RCH PM 23.68Budget proposed as per last year's approval except for
mobility support at sector level.
Visit of BPMU staff Mobility cost - 20 man days (Expected 70%
of total mandated visit days) visit per month (inclusive of DA,
POL for office / hired vehicle)
RCH PM per block 36000 0.36 12 4.32
Visit of Technical Specialists MO I/c - 8 visits p.m. (Expected
80% visits against 10 visits planned) RCH PM per block 16000 0.16 12 1.92
Vehicle hiring charges RCH PM per block 120000 1.20 12 14.40
Competitive bidding process to be adopted for hiring of
vehicle on monthly basis. Actual hiring charges to be booked
which would not exceed the limit specified by State Govt. vide
order no. - 27037, dt.08.10.2015
At sector level - AYUSH Doctor 8 days p.m. (Mobility + DA as
per Society norms) - 6 man days (Expected 70% of total
mandated visit days) visits per month
RCH PM Per Sector 8000 0.08 38 3.04 50% budgeted last year, however in the current FY total
estimated budget proposed.
16.3 B1.1.1.4.2Monthly Review meeting of ASHA facilitators with BCM at
block level-cost of travel and meeting expenses HSS ASHA Per sector 2400 0.02 47 1.13
Facilitation and travel cost of CP nodal persons at block level
towards conducting monthly ASHA sector meeting
Budget @Rs.200/- per sector p.m. for 12 months
16.3 Others 0.00 0.00
16.3
16.3 A.10.7.3
Page 120 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Any Other Mobility Expenses 0.00
16.3 G.5 Others: travel expenses for regular staff. CD NLEP Lumpsum 372000 3.72 0 0.00
16.4 Operational Cost 4.04The Expenditure occurred under this head is to be booked
under FMR 16.1
State 2.64
16.4 A.1.3.3 JSY Administrative Expenses RCH MH Lumpsum 52477 0.52 1 0.52
16.4 B.10.6.8 Information, Communication and Technology under IDSP CD IDSP Per PC 50000 0.50 1 0.50
16.4 B15.2.1 State Quality Assurance Unit (Operational cost) HSS HSS 0.00 0.00
16.4 B.27.2.2 Miscellaneous including Travel/POL/Stationaryetc. HSS NPPF 0.00 0.00
Office expenses on telephone, fax, Broadband Expenses &
Other Miscellaneous ExpendituresDCP IDSP 0.27
For SSU DCP IDSP Lumpsum 55000 0.55 0 0.00
For DSU DCP IDSP Per DSU 27000 0.27 1 0.27
16.4 F.1.4.a contingency support DCP NVBDCP 0.00 0.00
GFATM Project: Programme Administration Costs (PA) DCP NVBDCP 0.17
Office Running Cost (State) DCP NVBDCP Lumpsum 660000 6.60 0 0.00
Office Running Cost (District) DCP NVBDCP Per District 16500 0.17 1 0.17
16.4 G.4.3.a Office operation & Maintenance - State Cell DCP NLEP Lumpsum 75000 0.75 0 0.00
16.4 G.4.4.a State Cell - Consumables DCP NLEP Lumpsum 50000 0.50 0 0.00
Office Operation (Miscellaneous) DCP RNTCP 1.00
State Level DCP RNTCP 0.00
State TB Cell DCP RNTCP Per Month 70000 0.70 0 0.00
ATD& TC Cuttack DCP RNTCP Per Month 20000 0.20 0 0.00
IRL, Cuttack DCP RNTCP Per Month 8000 0.08 0 0.00
District Level DCP RNTCP 1.00
District TB Centre DCP RNTCP Per unit 100000 1.00 1 1.00
DR TB Centre DCP RNTCP Per unit 3600 0.04 0 0.00
16.4 M.2.2.2 Tobacco Cessation Centre (TCC): Office Expenses NCD NTCP Per District 18000 0.18 1 0.18
16.4 M.3.2.3 State Tobacco Control Cell (STCC): Misc./Office Expenses NCD NTCP Per month 5000 0.050
0.00
16.4 O.2.2.1 State NCD Cell (Contingency) NCD NPCDCS Lumpsum 200000 2.00 0 0.00
District 1.40
16.4 B15.2.2 District Quality Assurance Unit (Operational cost) HSS QA 0.00 0.00
16.4 B.29.1.2 Contingencies under NPPCF HSS NPPCFPer District
per annum60000 0.60 0 0.00
16.4 F.1.4.a contingency support DCP NVBDCP 0.00 0.00
16.4 G.4.3.b Office operation & Maintenance - District Cell DCP NLEP Lumpsum 30000 0.30 1 0.30
16.4 G.4.4.b District Cell - Consumables DCP NLEP Lumpsum 26000 0.26 1 0.26
16.4 J.1.5Operational expenses of the district centre : rent, telephone
expenses, website etc.NCD NMHP Per District 10000 0.10 1 0.10
16.4 J.1.7 Contingency under NMHP NCD NMHP Lum Sum 300000 3.00 0 0.00
16.4 M.1.3.5 District Tobacco Control Cell (DTCC): Misc./Office Expenses NCD NTCP Per District 24000 0.24 1 0.24
16.4 O.2.2.1 District NCD Cell (Contingency) NCD NPCDCS Per District 50000 0.50 1 0.50
16.4 E.4.2
16.4 F.2.1.h
16.4 H.11
Page 121 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Facility/ Block 0.00
16.4 A.2.2.1.1 SNCU Data management (excluding HR) RCH CH 0.00 0.00
16.5 PC&PNDT Activities 0.00
16.5.1 A.7.1 HR Support for PC&PNDT Cell RCH PNDT 0.00 0.00
16.5.2 A.7.3 Mobility support RCH PNDT 0.00 0.00 To be met out of Prog. Mgt. budget
Other PNDT activities (please specify) RCH PNDT 0.00
Statutory Meetings & Reviews RCH PNDT To be met out of programme management budget
Digitisation of data base & Maintatinance of Dedicated PC
PNDT Website for RCH PNDT Lumpsum 700000 7.00 0 -
Field Inspection by State Inspection and Monitoring Team
(PCPNDT)RCH PNDT Per inspection 5000 0.05 0 - Average 3 Inspections proposed in a month.
Supportive Supervision by State PC PNDT Cell RCH PNDT Per Inspection 5000 0.05 0 -
NGO Interventions to address declining Sex Ratio in targeted
Districts through mass awareness & advocacyRCH PNDT Per dist 400000 4.00 -
Strengthening selected village institution for addressing issues
of low sex ratio at birthRCH PNDT Per village 15000 0.15 -
Block level intervention RCH PNDT Per block 10000 0.10 -
16.6 HMIS & MCTS 10.01
16.6.1B15.3.1.1/
B15.3.1.2HR Support for HMIS & MCTS RCH 0.00 0.00
16.6.2B15.3.1.5.1/
B15.3.1.5.2Mobility Support for HMIS & MCTS RCH 0.00 0.00
Operational cost for HMIS & MCTS (incl. Internet connectivity;
AMC of Laptop, printers, computers, UPS; Office expenditure;
Mobile reimbursement)
RCH 10.01
Hard ware maintenance at State level RCH Lumpsum 2600000 26.00 0 -
AMC of Computer/Printer/UPS at Distinct & below level RCH Per unit 2500 0.03 15 0.38
@ Rs 2,500/- per computer / printer / UPS per year for AMC
of 402 computers / printers / UPS (State-8, District-80, Block-
314) being used for HMIS / RCH portal related work. These
are indicative rates, final rates are to be arrived at as per DGS
& D rate contract or after competitive bidding following
Government protocols. State must ensure that these
equipments are not covered by post-sale warranty /
guarantee.
AMC of Laptop RCH Per unit 1500 0.02 0 -
Rs 0.03 Lakh @ Rs 1,500/- per laptop per year for AMC 2
laptops at State level being used for HMIS / RCH portal
related work. These are indicative rates, final rates are to be
arrived at as per DGS & D rate contract or after competitive
bidding following Government protocols. State must ensure
that these equipments are not covered by post-sale warranty
/ guarantee. AMC of laptops at Block 275 level not
recommended.
16.5.3 A.7.2
16.6.3
B15.3.2.5/
B15.3.2.6/
B15.3.2.9/
B15.3.2.12/
B15.3.2.13
Page 122 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Internet Connectivity through LAN / data card RCH - -
Internet connection for M&E cell at SPMU RCH Per annum 60000 0.60 0 -
Internet connection for M&E cell at DPMU RCH Per dist p.a 30000 0.30 1 0.30
Internet connection (Broadband) for BPMU RCH Per BPMU p.a 12000 0.12 12 1.44
Internet connection (Broadband) for SDH RCH Per SDH p.a 6660 0.07 1 0.07
Other office expenditure RCHPer reporting
unit p.a.4800 0.05 13 0.62
Budget proposed for cartige, paper etc for printing of reports
& documentation at Block CHC - 314 + Urban unit - 50 = 364
Mobile reimbursement (CUG SIM) RCH Per ASHA 1188 0.01 0 -
Digitalisation of services & records at block level for different
health programmesRCH Per block 60000 0.60 12 7.20
Performance reward RCH
3 best performing ANMs per district would be awarded for
data quality & in time reporting. (Source : HMIS & ANMOL)
Funds proposed under budget heads 9.5.26.1, 9.5.26.2 and
9.5.26.3 shall be utilised for the purpose.
Procurement of Computer/Printer/UPS/ Laptop/ VSAT RCH 0.00
Replacement of desktop PC, UPS RCH Per Unit 55000 0.55 0 0.00 Approval Pended
Replacement of existing server RCH Lumpsum 1000000 10.00 0 0.00
Procurement of Laptop for e-VIN RCH 0.00 0.00
16.6.5B15.3.2.10/
B15.3.2.11Call Centre (Capex/ Opex) RCH 0.00 0.00 Integrated with Referral transport call centre.
16.7 Any Other PM Activities 30.70
E-Governance Initiatives 0.00
16.7 B14.2E-rakt kosh- refer to strengthening of blood services
guidelines HSS Blood Services 0.00 0.00
16.7 B15.2.6 QAC Misc. (IT Based application etc.) HSS HSS 0.00 0.00
16.7 F.1.1.dMonitoring , Evaluation & Supervision & Epidemic
Preparedness - Cost of NAMMISCD NVBDCP 0.00 0.00
Procurement and Maintenance of Office Equipment 5.10
16.7 E.4.2Minor repairs and AMC of IT/office equipment supplied under
IDSPDCP IDSP Lumpsum 200000 2.00 0 0.00
16.7 F.2.1.b Travel related Cost (TRC) - GFATM CD NVBDCP 0.00 0.00
16.7 G.4.3.c Office equipment maint. State DCP NLEP Lumpsum 50000 0.50 0 0.00
16.7 H.7 Vehicle Operation (Maintenance) CD RNTCP Lumpsum 510000 5.10 1 5.10
POL & Maintenance of two wheelers:
1. for STS @ Rs. 30000/- per vehicle
2. For STLS & Others: @ Rs. 30000/- per vehicle
O1.1.1Renovation and furnishing, furniture, computers, office
equipment (fax, phone, photocopier etc.)
16.7 O1.1.1.1 State NCD Cell NCD NPCDCS Lumps um 100000 1.00 0 0.00
1.Procuremnt of Desktop including UPS & Printer : 1 No @
Rs.40000/- Per unit
2. Procurement of laptop: 1 No @ Rs. 60,000 per unit
16.7 O1.1.1.2 District NCD Cell NCD NPCDCS 0.00 0.00
16.6.3
B15.3.2.5/
B15.3.2.6/
B15.3.2.9/
B15.3.2.12/
B15.3.2.13
16.6.4
B15.3.2.3/
B15.3.2.4/
B15.3.2.7/
B15.3.2.8
Page 123 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.7 Others 25.60
Pool: RCH, Prog. Div-PM
Administrative cost for PMU at different levels :
Total cost includes operational cost at different levels i.e.
State, district & block level
16.7 Administrative & Contingency expenses at State level RCH PM -
16.7Outsourcing of Services ( Security, Housekeeping & cleaning
and Office support staff) for all admin. UnitsRCH PM Per person 85200 0.85 0 -
16.7 Housekeeping for SPMU RCH PM Per qtr 15000 0.15 0 -
16.7Leased line connectivity for SPMU (Primary & Secondary)
including portable internet connectivity RCH PM Per qtr 187500 1.88 0 -
16.7Telephone expenses for all admin. units including centrex
facilityRCH PM Per unit 30000 0.30 0 -
16.7 Electricity charges for SPMU RCH PM Per qtr 210000 2.10 0 -
16.7 Govt. Vehicle Tax for SPMU RCH PM Per Annum 7000 0.07 0 -
16.7Hiring, DOL & Maintenance of hired & Govt. vehicles for all
admin. units RCH PM Per vehicles 120000 1.20 0 -
16.7 Advertisement for SPMU RCH PM Per qtr 375000 3.75 0 -
16.7 Stationary & Contingency for SPMU RCH PM Per qtr 300000 3.00 0 -
16.7 Postage & telegram for SPMU RCH PM Per qtr 66000 0.66 0 -
16.7 Legal expenses for SPMU RCH PM Per qtr 75000 0.75 0 -
16.7 Internet charges for all admin. units (Dongle) RCH PM Per qtr 15000 0.15 0 -
16.7 Special incentive to staff for SPMU RCH PM Lumpsum 200000 2.00 0 -
16.7 Workshop, meeting, exposure visits & hospitality RCH PM Per qtr 350000 3.50 0 -
16.7Logistic support (furniture fixture & digitalization of HR
documents etc) for all admin. units RCH PM Per qtr 300000 3.00 0 -
16.7 Administrative & Contingency expenses at District level RCH PM 4.50
16.7 Electricity & water charges of DPMU RCH PM per dist 30000 0.30 1 0.30
16.7 Housekeeping of DPMU RCH PM per dist 21600 0.22 1 0.22
16.7 Stationary & Contingency of DPMU RCH PM per dist 108000 1.08 1 1.08
16.7 Internet connection for DPMU RCH PM per dist 48000 0.48 1 0.48
16.7 Legal Expenses of DPMU RCH PM per dist 12000 0.12 1 0.12
16.7 Advertisement Expenses of DPMU RCH PM per dist 72000 0.72 1 0.72
16.7 Sub-staff (Peon + Sweeper) cost of DPMU RCH PM per dist 104640 1.05 1 1.05
16.7 Admin & Contingency for Hospital Managers at DHH (32) RCH PM per DHH 30000 0.30 1 0.30
16.7 Admin & Contingency for Prog. Mgt. units at SDH(26) RCH PM per SDH 24000 0.24 1 0.24
16.7 Administrative & Contingency expenses at Block level RCH PM 6.24
16.7 Stationary & Contingency of BPMU RCH PM Per block 30000 0.30 12 3.60
16.7 Electricity & water charge of BPMU RCH PM Per block 10000 0.10 12 1.20
16.7 Internet connection charge of BPMU RCH PM Per block 12000 0.12 12 1.44
16.7 A.2.7PM activities under Micronutrient Supplementation
ProgrammeRCH CH Per round 100000 1.00 0 0.00
Page 124 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.7 A.10.5 Audit Fees RCH PM Per annum 925000 9.25 0 0.00
Concurrent Audit system RCH PM 2.35
At state level RCH PM per qtr 45000 0.45 0 -
At dist level RCH PM per block 19600 0.20 12 2.35
16.7 B.10.1 Strengthening of BCC/IEC Bureaus (state and district levels) HSS IEC 0.00 0.00
Comprehensive Grievance Redressal Mechanism HSS HSS 12.47
Health Help line -104 HSS HSS Per seat p.a. 500000 5.00 0 -
Help Desk - Recurring expenses HSS HSS 0
For CHC HSS HSS Per CHC 312000 3.12 0 -
For SDH HSS HSS Per SDH 498000 4.98 1 4.98
For DHH HSS HSS Per DHH 748800 7.49 1 7.49
For MCH HSS HSS - - Funded under State budget
16.7 B.21.2 SHSRC: Other cost HSS SHSRC Per quarter 75000 0.75 0 0.00
16.7 F.1.2.d Epidemic preparedness CD NVBDCP 0.00 0.00
16.7 F.1.1.dMonitoring , Evaluation & Supervision & Epidemic
Preparedness - Cost of NAMMISDCP NVBDCP 0.00 0.00
16.7 I.1.7Management of Health Society (State to provide details of PM
Staff in the remarks column separately)NCD NPCB Lumpsum 1072000 10.72 0 0.00
16.7 M.1.3.1 District level Coordination Committee NCD NTCP Per Meeting 1000 0.01 4 0.04
The district level coordination committee scheduled on
quarterly basis. Approved @4 meetings per district per year.
Proposed Unit cost @1000/- per Meeting
16.7 M.3.2.1 State-level Coordination Committee NCD NTCP Per Meeting 3000 0.03 0 0.00 Frequency: Quarterly
16.7 M.3.5.1 Setting up of STCC NCD NTCP 0.00 0.00
16.7 O.2.8 Integration with Ayush NCD NPCDCS
O.2.8.1 State NCD Cell NCD NPCDCS 0.00 0.00
16.7 O.2.9 Innovation NCD NPCDCS
O.2.9.1 State NCD Cell NCD NPCDCS 0.00 0.00
O.2.9.2 District NCD Cell NCD NPCDCS 0.00 0.00
16.8 Human Resource 266.56
16.8.1 Strengthening of State/ Regional PMU 0.00
16.8.1.1
A.10.1.10/
D.1.a/ D.1.b/
D.1.c
Salaries for Staff on Deputation (Please specify) Lumpsum 7756132 77.56 0 0.00 Details at 16.8.PM Annex
16.8.1.2 B.21.1 Staffs under SHSRC Lumpsum 7741835 77.42 0 0.00 Details at 16.8.PM Annex
16.8.1.3 State level HR under RMNCH+A & HSS 0.00
16.8.1.3.1 Programme Managers Lumpsum 457036 4.57 0 0.00 Details at 16.8.PM Annex
16.8.1.3.2 Consultants/ Programme Officers Lumpsum 617476 6.17 0 0.00 Details at 16.8.PM Annex
16.8.1.3.3 Staff for civil / infrastructure work Lumpsum 306306 3.06 0 0.00 Details at 16.8.PM Annex
16.8.1.3.4 Programme Assistants Lumpsum 272278 2.72 0 0.00 Details at 16.8.PM Annex
16.7 A.10.6
16.7 B15.2.8
All state level
PM staff under
RMNCH+A,
A.10, Burn &
Injury, Blood
Services &
Disorders, ASHA
programme,
Quality
Assurance, and
other HSS
components
Page 125 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.8.1.3.5 Programme Coordinators Lumpsum 1719942 17.20 0 0.00 Details at 16.8.PM Annex
16.8.1.3.6 MIS/ IT Staff Lumpsum 457036 4.57 0 0.00 Details at 16.8.PM Annex
16.8.1.3.7 Supervisors 0.00 0.00
16.8.1.3.8 Accounts Staff Lumpsum 272278 2.72 0 0.00 Details at 16.8.PM Annex
16.8.1.3.9 Administrative Staff Lumpsum 145866 1.46 0 0.00 Details at 16.8.PM Annex
16.8.1.3.10 Data Entry Operation Lumpsum 145866 1.46 0 0.00 Details at 16.8.PM Annex
16.8.1.3.11 Support Staff (Kindly Specify) Lumpsum 555786 5.56 0 0.00 Details at 16.8.PM Annex
16.8.1.3.12 Other Staff Lumpsum 208380 2.08 0 0.00Details at 16.8.PM Annex16.8.1.4 State level HR under DCP 0.00
16.8.1.4.1 Programme Managers 0.00 0.00
16.8.1.4.2 Consultants/ Programme Officers Lumpsum 4949566 49.50 0 0.00 Details at 16.8.PM Annex
16.8.1.4.3 Programme Assistants 0.00 0.00
16.8.1.4.4 Programme Coordinators Lumpsum 2221960 22.22 0 0.00 Details at 16.8.PM Annex
16.8.1.4.5 MIS/ IT Staff Lumpsum 707818 7.08 0 0.00 Details at 16.8.PM Annex
16.8.1.4.6 Supervisors 0.00 0.00
16.8.1.4.7 Accounts Staff Lumpsum 1499232 14.99 0 0.00 Details at 16.8.PM Annex
16.8.1.4.8 Administrative Staff Lumpsum 961506 9.62 0 0.00 Details at 16.8.PM Annex
16.8.1.4.9 Data Entry Operation Lumpsum 291732 2.92 0 0.00 Details at 16.8.PM Annex
16.8.1.4.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.1.4.11 Other Staff Lumpsum 3848326 38.48 0 0.00 Details at 16.8.PM Annex
16.8.1.5 State level HR under NCD 0.00
16.8.1.5.1 Programme Managers 0.00 0.00
16.8.1.5.2 Consultants/ Programme Officers Lumpsum 1392983 13.93 0 0.00 Details at 16.8.PM Annex
16.8.1.5.3 Programme Assistants Lumpsum 272276 2.72 0 0.00 Details at 16.8.PM Annex
16.8.1.5.4 Programme Coordinators Lumpsum 617474 6.17 0 0.00 Details at 16.8.PM Annex
16.8.1.5.5 MIS/ IT Staff 0.00 0.00
16.8.1.5.6 Supervisors 0.00 0.00
16.8.1.5.7 Accounts Staff Lumpsum 878816 8.79 0 0.00 Details at 16.8.PM Annex
16.8.1.5.8 Administrative Staff Lumpsum 190588 1.91 0 0.00 Details at 16.8.PM Annex
16.8.1.5.9 Data Entry Operation Lumpsum 291732 2.92 0 0.00 Details at 16.8.PM Annex
16.8.1.5.10 Support Staff (Kindly Specify) Lumpsum 111153 1.11 0 0.00 Details at 16.8.PM Annex
16.8.1.5.11 Other Staff Lumpsum 617474 6.17 0 0.00 Details at 16.8.PM Annex
16.8.2 Strengthening of District PMU 168.27
16.8.2.1 District level HR under RMNCH+A & HSS 117.39
16.8.2.1.1 Programme Managers Lumpsum 3395221.2 33.95 1 33.95 Details at 16.8.PM Annex
. 16.8.2.1.2 Consultants/ Programme Officers Lumpsum 645112 6.45 1 6.45 Details at 16.8.PM Annex
16.8.2.1.3 Programme Assistants 0.00 0.00
16.8.2.1.4 Programme Coordinators 0.00 0.00
16.8.2.1.5 MIS/ IT Staff Lumpsum 593317 5.93 1 5.93 Details at 16.8.PM Annex
16.8.2.1.6 Supervisors 0.00 0.00
16.8.2.1.7 Accounts Staff Lumpsum 2620615 26.21 1 26.21 Details at 16.8.PM Annex
16.8.2.1.8 Administrative Staff Lumpsum 152586 1.53 1 1.53 Details at 16.8.PM Annex
16.8.2.1.9 Data Entry Operation Lumpsum 915516 9.16 1 9.16 Details at 16.8.PM Annex
All district level
PM staff under
RMNCH+A, A.10,
Burn & Injury,
Blood Services &
Disorders, ASHA
programme,
Quality
Assurance, and
other HSS
components
All state level
PM staff under
RMNCH+A,
A.10, Burn &
Injury, Blood
Services &
Disorders, ASHA
programme,
Quality
Assurance, and
other HSS
components
All state level
PM staff under
IDSP, NVBDCP,
NLEP, RNTCP
All state level
PM staff under
NPPCF, NPPC,
NOHP, NPPCD,
NPCB, NTCP,
NPHCE,
NPCDCS, NMHP
Page 126 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.8.2.1.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.2.1.11 Other Staff Lumpsum 3416486 34.16 1 34.16 Details at 16.8.PM Annex
16.8.2.2 District level HR under DCP 43.61
16.8.2.2.1 Programme Managers 0.00 0.00
16.8.2.2.2 Consultants/ Programme Officers Lumpsum 442411 4.42 1 4.42 Details at 16.8.PM Annex
16.8.2.2.3 Programme Assistants 0.00 0.00
16.8.2.2.4 Programme Coordinators Lumpsum 762905 7.63 1 7.63 Details at 16.8.PM Annex
16.8.2.2.5 MIS/ IT Staff Lumpsum 243104 2.43 1 2.43 Details at 16.8.PM Annex
16.8.2.2.6 Supervisors 0.00 0.00
16.8.2.2.7 Accounts Staff 0.00 0.00
16.8.2.2.8 Administrative Staff 0.00 0.00
16.8.2.2.9 Data Entry Operation 0.00 0.00
16.8.2.2.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.2.2.11 Other Staff Lumpsum 2913036 29.13 1 29.13 Details at 16.8.PM Annex
16.8.2.3 District level HR under NCD 7.27
16.8.2.3.1 Programme Managers 0.00 0.00
16.8.2.3.2 Consultants/ Programme Officers Lumpsum 726734 7.27 1 7.27 Details at 16.8.PM Annex
16.8.2.3.3 Programme Assistants 0.00 0.00
16.8.2.3.4 Programme Coordinators Lumpsum 0 0.00 1 0.00 Details at 16.8.PM Annex
16.8.2.3.5 MIS/ IT Staff 0.00 0.00
16.8.2.3.6 Supervisors 0.00 0.00
16.8.2.3.7 Accounts Staff 0.00 0.00
16.8.2.3.8 Administrative Staff 0.00 0.00
16.8.2.3.9 Data Entry Operation Lumpsum 0 0.00 1 0.00 Details at 16.8.PM Annex
16.8.2.3.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.2.3.11 Other Staff 0.00 0.00
16.8.3 Strengthening of Block PMU & Facilities 98.29
16.8.3.1 Block level HR under RMNCH+A & HSS 68.23
16.8.3.1.1 Programme Manager Lumpsum 2877739 28.78 1 28.78 Details at 16.8.PM Annex
16.8.3.1.2 Consultants/ Programme Officers 0.00 0.00
16.8.3.1.3 Programme Assistants 0.00 0.00
16.8.3.1.4 Programme Coordinators 0.00 0.00
16.8.3.1.5 MIS/ Staff Lumpsum 1831032 18.31 1 18.31 Details at 16.8.PM Annex
16.8.3.1.6 Supervisors 0.00 0.00
16.8.3.1.7 Accounts Staff Lumpsum 2113776 21.14 1 21.14 Details at 16.8.PM Annex
16.8.3.1.8 Administrative Staff 0.00 0.00
16.8.3.1.9 Data Entry Operation 0.00 0.00
16.8.3.1.10 Support Staff 0.00 0.00
16.8.3.1.11 Other Staff 0.00 0.00
16.8.3.2 Block level HR under DCP 30.07
16.8.3.2.1 Programme Managers 0.00 0.00
16.8.3.2.2 Consultants/ Programme Officers 0.00 0.00
All district level
PM staff under
RMNCH+A, A.10,
Burn & Injury,
Blood Services &
Disorders, ASHA
programme,
Quality
Assurance, and
other HSS
components
All district level
PM staff under
IDSP, NVBDCP,
NLEP, RNTCP
All district level
PM staff under
NPPCF, NPPC,
NOHP, NPPCD,
NPCB, NTCP,
NPHCE,
NPCDCS, NMHP
All block level
PM staff under
RMNCH+A, A.10,
Burn & Injury,
Blood Services &
Disorders, ASHA
programme,
Quality
Assurance, and
other HSS
components
All block level
PM staff under
IDSP, NVBDCP,
NLEP, RNTCP
Page 127 of 280
Kandhamal_Prog.Management
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
16.8.3.2.3 Programme Assistants 0.00 0.00
16.8.3.2.4 Programme Coordinators 0.00 0.00
16.8.3.2.5 MIS/ IT Staff 0.00 0.00
16.8.3.2.6 Supervisors 0.00 0.00
16.8.3.2.7 Accounts Staff 0.00 0.00
16.8.3.2.8 Administrative Staff 0.00 0.00
16.8.3.2.9 Data Entry Operation 0.00 0.00
16.8.3.2.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.3.2.11 Other Staff Lumpsum 3006864 30.07 1 30.07 Details at 16.8.PM Annex
16.8.3.3 Block level HR under NCD 0.00
16.8.3.3.1 Programme Managers 0.00 0.00
16.8.3.3.2 Consultants/ Programme Officers 0.00 0.00
16.8.3.3.3 Programme Assistants 0.00 0.00
16.8.3.3.4 Programme Coordinators 0.00 0.00
16.8.3.3.5 MIS/ IT Staff 0.00 0.00
16.8.3.3.6 Supervisors 0.00 0.00
16.8.3.3.7 Accounts Staff 0.00 0.00
16.8.3.3.8 Administrative Staff 0.00 0.00
16.8.3.3.9 Data Entry Operation 0.00 0.00
16.8.3.3.10 Support Staff (Kindly Specify) 0.00 0.00
16.8.3.3.11 Other Staff 0.00 0.00
16.8.4 PM HR Increment 0.00 0.00
16.8.5 PM HR EPF Lumpsum 49295000 492.95 0 0.00
SL No Component Colour code
1 RCH
2 HSS
3 RI
4 IDSP
5 NLEP
6 RNTCP
7 NVBDCP
8 NPCB
9 NPCDCS
10 NTCP
11 NMHP
12 NPPCF
All block level
PM staff under
IDSP, NVBDCP,
NLEP, RNTCP
All block level
PM staff under
NPPCF, NPPC,
NOHP, NPPCD,
NPCB, NTCP,
NPHCE,
NPCDCS, NMHP
Page 128 of 280
Kandhamal_IT
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
17 IT Initiatives for strengthening Service Delivery 0.00
17.1 I.2.9Fixed tele- ophthalmic network unit in Got. Set up/ internet
based ophthalmic consultation unit) @Rs.15 lakhNCD NPCB 0.00 0.00
17.2 B18.3 Telemedicine/ teleconsultation facility at H&WC HSS HSS/ CP 0.00 0.00
17.3 Implementation of ANMOL (Excl Procurement) HSS HSS 0.00 0.00
17.4 B14.2E-rakt kosh- refer to strengthening of blood services
guidelines HSS Blood Services Per annum 12524000 125.24 0 0.00
NHM has supported for positioning of HR at all Govt. Blood
Banks through NICSI to operationalize e-Blood Bank .
Payment to be made centrally
17.5 B15.2.6 QAC Misc. (IT Based application etc.) HSS HMIS-MCTS 0.00 0.00
17.6 B15.3.4.1 Implementation of Hospital Management System HSS HMIS-MCTS 0.00 0.00
Other IT Initiatives for Service Delivery (please specify) 0.00
MWMIS Implementation RCH MH Per facility 62000 0.62 0 -
SMS service to SNCU discharged cases RCH CH - -
Development of online application of CDR RCH CH Lumpsum 300000 3.00 0 - Budget Not Approved, GoI is in process of developing MDCR
Software
ASHA Software HSS CP Lumpsum 1000000 10.00 0 - Approval Pended
Maintenance of NHM web site & iHRIS HSS HSS Lumpsum 1000000 10.00 0 -
GIS based mapping of service area as per GP coterminous
planHSS HSS Lumpsum 1500000 15.00 0 - Approval Pended
Mission Connect - CUG connection to service providers &
programme officialsHSS HSS Lumpsum 17750400 177.50 0 -
SL No Component Colour code
1 RCH
2 HSS
3 NPCB
Annexure for IT Initiatives - Service Delivery
17.7
Page 129 of 280
Kandhamal_Innov.
Kandhamal
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
18 B14 Innovations (if any) 386.46
18.1 Operationalisation of Maternity Waiting Home RCH MH Per MWH 1180068 11.80 7 82.60
18.2 Universial screening of HIV for ANC RCH MH Per session 75 0.00 0.00 Budget Not Approved. To be supported by NACO.
18.3Incentive to ASHA Sathi for strengthening HBNC, HBNC+ &
follow up of critical babiesRCH CH Per ASHA Sathi 2400 0 0.00
HR reforms HSS HSS 1.60
Integrated Counselling Center at DHHs HSS HSS Per unit P.A 60000 0.60 1 0.60
Under overarching umbrella of NHM, different programmes
that are being implemented in the State have the component
of counselling as one of the integral part of the programme.
These programmes have a separate counselling set up and
dedicated manpower. Last year approval was for integrated
counselling centre by combining individual set up of all
counselling units. Both non-recurring & recurring cost have
been approved @ Rs.7.40 lakhs per unit.
Proposal 2018-19 : Operational cost @Rs.60000/- p.a. per
unit
Integrated Physiotherapist Center at DHHs HSS HSS Per unit P.A 100000 1.00 1 1.00
The physiotherapy treatment usually targets on various
categories of patients of all age group and deals with simple
injury to physical rehabilitation of complicated neurological
disorders. Currently State is having four different
programmes where physiotherapists are in position. State has
mandated to follow the Health Systems Approach which
focuses optimal utilization of all resources including
infrastructure and manpower which has been approved in
2017-18. Both non-recurring & recurring cost have been
approved @ Rs.21.60 lakhs per unit.
Proposal 2018-19 : Operational cost @Rs.100000/- p.a. per
unit
18.4 Integrated MIS wing at District Level HSS HSS 0.00 0.00
Presently State is receiving data from various programme
divisions with virtually no coordination at district level with
respect to report sharing for various programmatic
interventions. It has also been observed that there is unequal
work load among data persons and there has been increasing
need for data personnel utilizing their services to their
optimum level with clear cut job responsibility and reporting
timeline. In order to remove individualistic approach and
incorporating better management through knowledge and
workforce sharing Odisha State has planned for setting up of
integrated Data Centre at District level which has been
approved in 2017-18. Both non-recurring & recurring cost
have been approved @ Rs.3.20 lakhs per unit.
Annexure for Innovations
18.4
Page 130 of 280
Kandhamal_Innov.
New FMR Old FMR Particulars PoolProgramme
Division
Unit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Other Innovation Lumpsum 302.26
DHH Strengthening HSS HSS Lumpsum 29043000 290.43 1 290.43
Infrastructure Development for training & education during
the year 2018-19: As per gap assessment Rs.932.76 lakhs
((Kandhamal Rs. 290.43 lakhs, Sundergarh Rs. 290.43 lakhs &
Capital Hospital Rs. 351.9 lakhs)
PG Diploma Courses through CPS , Mumbai HSS HSS Lumpsum 565000 5.65 0 -
Active Case Finding of TB Patients DCP RNTCP 11.83
District level one day Orientation training of DPM/DAM/
ASHA Manager/ ADPHCO/ Dist. RNTCP Staff/ MOTC/PHEO/
CDPO
DCP RNTCP Per Batch 16000 0.16 1 0.16 Detail in Annexure
One day Block Level Orientation training of BPM/BAM/
ASHA/ANM/MPHS/ MHU /Field supporting member DCP RNTCP Per Batch 21250 0.21 12 2.55 Detail in Annexure
Sector Level Activities DCP RNTCP Per round 9500 0.10 48 9.12
NHM Employees Welfare Fund HSS HSS Lumpsum 2700000 27.00 0 -
Discretionary Grant for State HSS HSS Lumpsum - 0 -
18.6 Viral Hepatites HSS HSS Lumpsum 4,28,000.00 4.28 0 - Details at Viral Hepatitis Annex
SL No Component Colour code
1 RCH
2 HSS
3 RNTCP
18.5
Page 131 of 280
SL District Facility with NRC Amount (Rs. In Lakhs)
1 Khurda Capital Hosp. BBSR
2 Khurda CHC Banapur
3 Sambalpur VSS MC, Burla
4 Bolangir CHC Khaprakhole
5 Dhenkanal SDH Hindol
6 Jharsuguda DHH Jharsuguda
7 Puri DHH Puri
8 Boudh DHH Boudh
9 Rayagada SDH Gunpur
10 Jagatsinghpur DHH Jagatsinghpur
11 Jajpur CHC,Jajpur Road
12 Sonepur CHC Ullunda
13 Deogarh DHH Deogarh
14 Nayagarh CHC Khandapada
15 Anugul CHC Khamar
16 Kalahandi CHC Jaipatna
Total 62.4
1 Malkangiri Pandripani
2 Malkangiri DHH Malkangiri
3 Nawarangpur DHH Nawarangpur
4 Ganjam DHH Ganjam
5 Koraput DHH Koraput
6 Keonjhar DHH Keonjhar
7 Koraput CHC Rabanaguda
8 Sambalpur DHH Sambalpur
9 Mayurbhanj SDH Karanjia
10 Ganjam SDH Bhanjanagar
11 Mayurbhanj SDH Rairangpur
12 Keonjhar CHC Bansapal
13 Kandhamal DHH Kandhamal
14 Gajapati DHH Gajapati
15 Keonjhar SDH Champua
16 Kalahandi DHH Kalahandi
17 Balasore DHH Baleswar
18 Nuapada DHH Nuapada
19 Bolangir DHH Bolangir
20 Jajpur CHC,Sukinda
NRC Annexure
Proposal:2
Proposal:1For operational NRCs with less than 50% BO
For operational NRCs with more than 50% BO
Rs 3.9 lakhs per NRC (may be allowed to spend 7.8 lakhs if reported BOR is
more than 50%)
16 NRC x 3.9 Lakhs per NRC
Rs 7.8 lakhs per NRC
Page 132 of 280
SL District Facility with NRC Amount (Rs. In Lakhs)
21 Nayagarh DHH Nayagarh
22 Cuttack Sishubhawan
23 Sonepur DHH Sonepur
24 Sundargarh DHH Sundergarh
25 Mayurbhanj SDH Udala
26 Kendrapara DHH Kendrapada
27 Mayurbhanj DHH Mayurbhanj
28 Dhenkanal SDH Kamakshyanagar
29 Kandhamal SDH Baliguda
30 Kalahandi SDH Dharamgarh
31 Bargarh SDH Padampur
32 Bargarh CHC Bheden
33 Bolangir CHC Saintala
34 Sundargarh SDH Boneigarh
35 Gajapati CHC Chandragiri
36 Ganjam CHC Aska
37 Puri CHC Sakhigopal
38 Angul DHH Angul
39 Keonjhar CHC Barbil
Total 304.2
1 Rayagada DHH Rayagada
2 Nawarangpur CHC Umerkote
Total 23.4
1 Bhadrak DHH Bhadrak
4 Balasore SDH Nilagiri
5 Cuttack SDH Athagarh
Total 23.4
1 Koraput CHC Laxmipur
2 Malkangiri CHC Mathili
3 Balasore CHC GK Bhattar
4 Kendrapada CHC Pattamundai
5 Kandhamal CHC Daringbadi
6 Nuapada CHC Khariar
7 Sundergarh RGH Rourkela
Total 40.95
454.35
Rs 11.7 lakhs per NRC
2 NRC x 11.7 Lakhs per NRC
39 NRC x 7.8 Lakhs per NRC
For other 3 ten bedded NRCs with 10 beds for which report is awaited OPEX recommended
Grand Total
For rest 7 NRCs to be made functional
Proposal:5
Proposal:3
Upgradation of 2 NRCs from 10 to 15 bedes
Proposal:4
3 NRC x 7.8 Lakhs per NRC
Rs 7.8 lakhs per NRC
Rs 5.85 lakhs per NRC
7NRC x 5.85 Lakhs per NRC
Rs 7.8 lakhs per NRC
Page 133 of 280
Civil Abstract
New FMR Name of the Work Unit No Total Cost
New construction of Attendant Rest Shed (DHH) 3 84.00
New construction of Ward (DHH) 3 179.00
New construction of Attendant Rest Shed (SDH) 3 84.00
New construction of Ward (SDH) 2 96.00
New construction of OPD (SDH) 3 300.00
Construction of New Operation Theatre (CHC) 31 1240.00
New construction of Labour Room (CHC) 33 1254.00
New construction of Attendant Rest Shed (CHC) 5 140.00
New construction of Ward (CHC) 35 1680.00
New construction of OPD (CHC) 32 2560.00
5.1.1.1.d New construction of Labour Room (PHC-N) 23 598.00
Up gradation/ Renovation work at (SNCU) 6 180.00
Up gradation/ Renovation work at (KMC Units) 11 11.00
Compresensive Lactation Management Unit 2 20.00
5.1.1.2.e Up gradation/ Renovation work at CHC 1 25.00
5.1.1.2.f Up gradation/ Renovation work at PHC 4 142.00
5.1.1.2.g Up gradation/ Renovation work at SC 1 4.00
5.1.1.2.h Infrastructure strengthening of SC to H&WC 842 3368.00
5.1.1.2.i Conference hall at Mission Directorate 1 10.00
5.1.1.2.j Spill over of Ongoing works - (Construction of Drug Ware House at CHC) 23 550.00
5.1.1.2.l Up gradation of Preview Theatre 1 10.00
5.1.1.3.b Spill over of Ongoing works - (Major Up gradation work of SDH) 12 875.00
5.1.1.3.c Spill over work Construction of CHC Building 6 420.00
5.1.1.3.f Additional requirement from previous work (MCH wing) 19 8614.79
5.1.1.3.j Ongoing/ Spillover work of District Vaccine Store 7 158.00
5.2.2.1 Carry forward of new construction of DHH initiated last year, or the year before 1 0.00
5.2.1.2 New construction New Hospital Building (OPD IPD Complex) at SDH 1 125.00
5.2.1.3 New construction New Hospital Building (OPD IPD Complex) at CHC 2 138.00
5.2.1.5 New construction (SC) 8 220.00
5.2.1.6 New MCH wings (to be initiated this year) 4 1925.00
5.2.1.9 New Construction of AFHC Clinic 2 1.00
5.2.1.11 New Construction of Drug Ware House at SDH 13 195.00
5.2.2.7 Spill over of Ongoing works\ (DEIC) RBSK 3 56.20
5.3.2 Repair & Renovation of AHSA Ghar 84 84.00
5.3.3 Repair & Renovation of Blood Banks 35 70.00
5.3.9 Construction of Safety Pits 262 15.72
5.3.14 Civil works under RNTCP 1 30.00
5.3.16 Construction of Geriatric ward 2 80.00
Renovation of Post Surgery critical units for new born 1 10.00
Lighting Arrester (Units required for DHH-64 nos for 32 DHHs , for SDH-27 nos for 27 SDHs & for CHC-377 nos
for 377 CHCs ) @ Rs. 1.80 Lakhs per unit x 468 units
468 842.40
Pipe water supply system 127 547.70
Expansion &up gradation of internal electrification 65 347.50
Grand Total 2188 27290.31
Civil Abstract 2018-19
5.3.18
5.1.1.1.a
5.1.1.1.b
5.1.1.1.c
5.1.1.1.g
Page 134 of 280
Infrastructure Annex-I
S.
No.
Name of the
District
Whether
HPD
(Y/N)
Name of the FacilityType of the
Facility
No of
Existin
g Beds
No. of
Additiona
l Beds
proposed
Project cost
(Civil+EI+P
H)
Other
Infrastructure
Development cost
including
Equipment/
Instrument,
furniture &
reposinig cost
ofcritical care
units like NBSU,
SNCU, NRC etc.
Amount
Required
for Fire
Fighting
Total funds
proposed for the
Wing (including
Infrastructure &
Equipments as
per the MNH
Toolkit & Fire
Safety)
Fund
Approved
till 2017-18
Expenditur
e to date
(Rs. Lakhs)
Physical Status
Funds
Approved in
2018-19
(Rs. Lakhs)
Time-line
for
completion
1 GANJAM N Bhanjanagar. SDH SDH 80 50 900.00 125.00 100.00 1125.00 NA NA Newly Proposed 562.50 2020-21
2JAGATSINGHAP
URN Jagatsingpur DHH DHH 126 50 900.00 125.00 100.00 1125.00 NA NA Newly Proposed 562.50 2020-21
3 JAJAPUR N Barachana CHC CHC 30 30 650.00 75.00 75.00 800.00 NA NA Newly Proposed 400.00 2020-21
4 BALASORE N Simulia CHC CHC 16 30 650.00 75.00 75.00 800.00 NA NA Newly Proposed 400.00 2020-21
3100.00 400.00 350.00 3850.00 0.00 1925.00
New MCH Wings 2018-19
Page 135 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
1 Baragarh NHPD DHH 1 DHH Bargarh New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.a
2 Gajapati HPD DHH 2 Paralakhemundi New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.a
3 Sambalpur NHPD DHH 3 DHH Sambalpur New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.a
84.00 0.00 0.00 0.00 0.00 84.00
4 Balasore NHPD DHH 1 DHH Balasore New work New construction of Diarrhoea Ward 48 0 0 0 2019-20 48 5.1.1.1.a
5 Balasore NHPD DHH 2 DHH Balasore New work New construction of Dengue Ward 48 0 0 0 2019-20 48 5.1.1.1.a
6 Sundargarh NHPD DHH 3 DHH Sundargarh New work New construction of General Ward 83 0 0 0 2019-20 83 5.1.1.1.a
179.00 0.00 0.00 0.00 0.00 179.00
263.00
7 Balasore NHPD SDH 1 Nilgiri SDH New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.b
8 Ganjam NHPD SDH 2 SDH Bhanjanagar New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.b
9 Sambalpur NHPD SDH 3 SDH Rairakhol New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.b
84.00 0.00 0.00 0.00 0.00 84.00
10 Balasore NHPD SDH 1 Nilgiri SDH New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.b
11 Balangir HPD SDH 2 Titlagarh New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.b
96.00 0.00 0.00 0.00 0.00 96.00
12 Angul NHPD SDH 1 Pallahara New work Construction of OPD Building 100.00 0.00 0.00 0.00 2019-20 100.00 5.1.1.1.b
New construction of Attendant Rest Shed (DHH)
Sub Total
Sub Total
New construction of Ward (SDH)
Sub Total
New construction of Ward (DHH)
New construction of Attendant Rest Shed (SDH)
Sub Total
New Construction of OPD Building (SDH)
Detail Civil Construction 2018-19
Sub Total of (5.1.1.1.a)
Page 136 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
13 Balangir HPD SDH 2 Patnagarh New work Construction of OPD Building 100.00 0.00 0.00 0.00 2019-20 100.00 5.1.1.1.b
14 Sambalpur NHPD SDH 3 SDH Rairakhol New work Construction of OPD Building 100.00 0.00 0.00 0.00 2019-20 100.00 5.1.1.1.b
300.00 0.00 0.00 0.00 0.00 300.00
480.00
15 Angul NHPD CHC 1 Khamar New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
16 Balasore NHPD CHC 2 Remuna New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
17 Balasore NHPD CHC 3 Rupsa New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
18 Baragarh NHPD CHC 4 CHC Bijepur New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
19 Baragarh NHPD CHC 5 CHC Bheden New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
20 Cuttack NHPD CHC 6 CHC Bentkar New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
21 Cuttack NHPD CHC 7 CHC Adaspur New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
22 Cuttack NHPD CHC 8 CHC Mahidharpada New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
23 Cuttack NHPD CHC 9 CHC Niali New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
24 Cuttack NHPD CHC 10 CHC Nischintakoili New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
25 Cuttack NHPD CHC 11 CHC Tangi New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
26 Cuttack NHPD CHC 12 CHC Narsinghpur New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
27 Cuttack NHPD CHC 13 CHC Jodum New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
28 Cuttack NHPD CHC 14 CHC Tigiria New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
29 Gajapati HPD CHC 15 CHC Gumma New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
30 Ganjam NHPD CHC 16 CHC Sumandala New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
31 Ganjam NHPD CHC 17 CHC Balisira New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
32 Ganjam NHPD CHC 18 CHC Girisola New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
33 Jharsuguda NHPD CHC 19 Kolabira CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
34 Mayurbhanj NHPD CHC 20SRIDAMCHANDRAPUR
CHCNew work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
35 Mayurbhanj NHPD CHC 21 KISANTANDI CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
36 Mayurbhanj NHPD CHC 22 RANGAMATIA CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
37 Mayurbhanj NHPD CHC 23 DUKURA CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
38 Mayurbhanj NHPD CHC 24 KHUNTA CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
39 Mayurbhanj NHPD CHC 25 K.C.PUR CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
40 Mayurbhanj NHPD CHC 26 KULIANA CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
41 Mayurbhanj NHPD CHC 27 BIJATOLA CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
42 Mayurbhanj NHPD CHC 28 Jamda CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
43 Mayurbhanj NHPD CHC 29 Raruan CHC New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
44 Nuapada HPD CHC 30 CHC,bhela New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
45 RAYAGADA HPD AH 31 AH,Ambadola New work Construction of New Operation Theatre 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.1.c
Sub Total
New construction of Operation Theatre (CHC)
Sub Total of (5.1.1.1.b)
Page 137 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
1240.00 0.00 0.00 0.00 0.00 1240.00
46 Angul NHPD CHC 1 Khamar New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
47 Balangir HPD CHC 2 Chudapali New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
48 Balasore NHPD CHC 3 Gopalpur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
49 Cuttack NHPD CHC 4 Adaspur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
50 Cuttack NHPD CHC 5 Mahidharpada New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
51 Cuttack NHPD CHC 6 Niali New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
52 Cuttack NHPD CHC 7 Kanpur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
53 Cuttack NHPD CHC 8 Narasingpur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
54 Cuttack NHPD CHC 9 Tigiria New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
55 Cuttack NHPD CHC 10 Berhampur. New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
56 Ganjam NHPD CHC 11 Balisira New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
57 Ganjam NHPD CHC 12 Sumandal New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
58 Ganjam NHPD CHC 13 Kukudakhandi New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
59 Ganjam NHPD CHC 14 Khandadeuli New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
60 Ganjam NHPD CHC 15 JagannathPrasad New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
61 Ganjam NHPD CHC 16 Gallery New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
62 Ganjam NHPD CHC 17 Purshottampur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
63 Jajpur NHPD CHC 18 Korei New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
64 Kalahandi HPD OH 19 Risida New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
65 Khurda NHPD CHC 20 Balugaon New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
66 MAYURBHANJ NHPD CHC 21 Sri-Ramachandrapur New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
67 MAYURBHANJ NHPD CHC 22 DUKURA New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
68 MAYURBHANJ NHPD CHC 23 Khunta New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
69 MAYURBHANJ NHPD CHC 24 K.C.PUR New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
70 MAYURBHANJ NHPD CHC 25 KISANTANDI New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
71 MAYURBHANJ NHPD CHC 26 RARUAN New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
72 MAYURBHANJ NHPD CHC 27 Sukruli New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
73 Puri NHPD CHC 28 Astaranga New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
74 Puri NHPD CHC 29 Delanga New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
75 Puri NHPD CHC 30 Kanas New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
76 Sambalpur NHPD CHC 31 Jujumura New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
Sub Total
New construction of LR (CHC)
Page 138 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
77 Sambalpur NHPD CHC 32 Naktideul New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
78 Sonepur NHPD CHC 33 Ullunda New work Construction of L.R 38.00 0.00 0.00 0.00 2019-20 38.00 5.1.1.1.c
1254.00 0.00 0.00 0.00 0.00 1254.00
79 Baragarh NHPD CHC 1 Jamala New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.c
80 Cuttack NHPD CHC 2 CHC Salipur New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.c
81 Cuttack NHPD CHC 3 CHC Mahanga New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.c
82 Ganjam NHPD CHC 4 CHC Aska New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.c
83 Sonepur NHPD CHC 5 CHC Dunguripali New work Construction of Attendant Rest Shed 28.00 0.00 0.00 0.00 2019-20 28.00 5.1.1.1.c
140.00 0.00 0.00 0.00 0.00 140.00
84 Balangir HPD CHC 1 Saintala New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
85 Balangir HPD CHC 2 Muribahal New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
86 Balangir HPD CHC 3 Kantabanji New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
87 Balangir HPD CHC 4 Loisingha New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
88 Balangir HPD CHC 5 Belpara New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
89 Balasore NHPD CHC 6 Khaira CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
90 Balasore NHPD CHC 7 CHC Hatigarh New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
91 Balasore NHPD CHC 8 CHC Berhampur New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
92 Bhadrak NHPD CHC 9 Agarpada New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
93 Boudh HPD CHC 10 CHC Baunsuni New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
94 Boudh HPD CHC 11 CHC Purunakatak New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
95 Cuttack NHPD AH 12 Kalapathar AH New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
96 Cuttack NHPD CHC 13 CHC Bentkar New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
97 Cuttack NHPD CHC 14 CHC Nischintakoili New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
98 Cuttack NHPD CHC 15 CHC Mahidharpada New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
99 Cuttack NHPD CHC 16 CHC Kanpur New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
100 Cuttack NHPD CHC 17 CHC Narsinghpur New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
Sub Total
New construction of Attendant Rest Shed (CHC)
Sub Total
New construction of Ward (CHC)
Page 139 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
101 Cuttack NHPD CHC 18 CHCTigiria New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
102 Cuttack NHPD CHC 19 CHC Maniabandha New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
103 Deogarh NHPD CHC 20 CHC, Barkote New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
104 Deogarh NHPD CHC 21 CHC, Chhatabar New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
105 Gajapati HPD CHC 22 Chandragiri New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
106 Gajapati HPD CHC 23 B.K Pada New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
107 Gajapati HPD CHC 24 Gumma New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
108 Kendrapada NHPD CHC 25 CHC, Patkura New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
109 Khurda NHPD CHC 26 CHC Bankoi New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
110 MAYURBHANJ NHPD CHC 27 Tiring CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
111 MAYURBHANJ NHPD CHC 28 RANGAMATIA CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
112 MAYURBHANJ NHPD CHC 29 Sirsha CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
113 MAYURBHANJ NHPD CHC 30 Kostha CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
114 MAYURBHANJ NHPD CHC 31 Jamda CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
115 Nabarangpur HPD CHC 32 Tentulikhunti New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
116 Puri NHPD CHC 33 Nimapada New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
117 RAYAGADA HPD CHC 34 CHC,muniguda New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
118 Sundargarh NHPD CHC 35 Birmitrapur CHC New work New construction of Ward 48.00 0.00 0.00 0.00 2019-20 48.00 5.1.1.1.c
1680.00 0.00 0.00 0.00 0.00 1680.00
119 Angul NHPD CHC 1 Bantala New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
120 Angul NHPD CHC 2 Banarpal New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
121 Angul NHPD CHC 3 Madhapur New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
122 Balangir HPD CHC 4 Turekela New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
123 Balangir HPD CHC 5 Khaprakhol New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
124 Balasore NHPD CHC 6 Simulia CHC New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
125 Balasore NHPD CHC 7 CHC Berhampur New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
126 Balasore NHPD CHC 8 Iswarapur New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
127 Balasore NHPD CHC 9 Khantapada CHC New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
128 Baragarh NHPD CHC 10 CHC Bheden New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
129 Baragarh NHPD CHC 11 CHC Talpali New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
130 Cuttack NHPD CHC 12 CHC Bentkar New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
131 Cuttack NHPD CHC 13 CHC Salipur New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
Sub Total
New construction of OPD Building (CHC)
Page 140 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
132 Cuttack NHPD CHC 14 CHC Mahidharpada New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
133 Cuttack NHPD CHC 15 CHC Narsinghpur New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
134 Cuttack NHPD CHC 16 CHC Tigiria New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
135 Cuttack NHPD CHC 17 CHC Maniabandha New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
136 Deogarh NHPD CHC 18 CHC, Chhatabar New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
137 Gajapati HPD CHC 19 R.Udyagiri New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
138 Gajapati HPD CHC 20 Gumma New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
139 Gajapati HPD CHC 21 Kasinagar New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
140 Jajpur NHPD CHC 22 Korei New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
141 Jajpur NHPD CHC 23 Sukinda New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
142 Kalahandi HPD CHC 24 CHC Pastikudi New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
143 Kandhamal HPD CHC 25 K.Nuagaon New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
144 Khurda NHPD CHC 26 CHC Bankoi New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
145 MAYURBHANJ NHPD CHC 27 TATO New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
146 MAYURBHANJ NHPD CHC 28 JASHIPUR New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
147 MAYURBHANJ NHPD CHC 29 BADAMPAHAD New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
148 MAYURBHANJ NHPD CHC 30 Jamda CHC New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
149 Puri NHPD CHC 31 Delanga CHC New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
150 Sambalpur NHPD CHC 32 CHC Jujumura New work Construction of OPD Building 80.00 0.00 0.00 0.00 2019-20 80.00 5.1.1.1.c
2560.00 0.00 0.00 0.00 0.00 2560.00
6874.00
151 Balangir HPD PHC(N) 1 Tikrapada New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
152 Balangir HPD PHC(N) 2 Luhasingha New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
153 Balasore NHPD PHC 3 Manipur New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
154 Balasore NHPD PHC 4 Paschimabad New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
155 Gajapati HPD PHC(N) 5 Ramagiri New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
156 Gajapati HPD PHC(N) 6 Birikot New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
157 Gajapati HPD PHC(N) 7 P.Govindapur New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
158 Ganjam NHPD PHC(N) 8 Sunadei New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
159 Ganjam NHPD PHC(N) 9 Talasingi New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
Sub Total
New construction of LR (PHC-N)
Sub Total of (5.1.1.1.c)
Page 141 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
160 Koraput HPD PHC 10 Murtahandi New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
161 Koraput HPD PHC 11 Sasahandi New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
162 Koraput HPD PHC 12 Alamanda New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
163 Koraput HPD PHC 13 Banamaliput New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
164 Malkangiri HPD PHC 14 Jodamba New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
165 MAYURBHANJ NHPD PHC(N) 15 Bisoi New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
166 MAYURBHANJ NHPD PHC(N) 16 Salachua New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
167 Nabarangpur HPD PHC 17 Asang New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
168 Nabarangpur HPD PHC 18 BADA-AMDA New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
169 Nuapada HPD PHC 19 Darlimunda New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
170 Nuapada HPD PHC 20 Dharambandha New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
171 Sambalpur NHPD PHC 21 Keseibahal New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
172 Sambalpur NHPD PHC 22 Bhojpur New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
173 Sundargarh NHPD PHC N 23 Bahijodi New work Construction of L.R 26.00 0.00 0.00 0.00 2019-20 26.00 5.1.1.1.d
598.00 0.00 0.00 0.00 0.00 598.00
598.00
174 Bolangir HPD SDH 1 SDH Patnagarh New work Construction of 12 Beded SNCU 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
175 Mayurbhanj NHPD SDH 2 SDH Udala New work Construction of 12 Beded SNCU 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
176 Keonjhar HPD SDH 3 SDH Anandapur New work Construction of 12 Beded SNCU 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
177 Ganjam NHPD DHH 4 City Hosp. Berhampur New work Construction of 12 Beded SNCU 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
178 Bhadrak NHPD DHH 5 DHH Bhadrak New work Upgradation of SNCU from 12 to 24 Beded 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
179 RAYAGADA HPD DHH 6 DHH Rayadaga New work Upgradation of SNCU from 12 to 24 Beded 30.00 0.00 NA NA 2019-20 30.00 5.1.1.1.g
180.00 0.00 0.00 0.00 0.00 180.00Sub Total
Up gradation/ Renovation work at (KMC Units)
Sub Total of (5.1.1.1.d)
Sub Total
Up gradation/ Renovation work at (SNCU)
Page 142 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
180 Dhenkanal HPD DHH 1 DHH Dhenkanal New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
181 Jajpur NHPD DHH 2 DHH Jajpur New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
182 Kendrapada NHPD DHH 3 DHH Kendrapada New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
183 Khurda NHPD DHH 4 DHH Khurda New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
184 JAGATSINGHAPUR NHPD DHH 5 DHH Jagatsingpur New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
185 Gajapati HPD DHH 6 Paralakhemundi DHH New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
186 MAYURBHANJ NHPD SDH 7 SDH Karanjia New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
187 MAYURBHANJ NHPD SDH 8 SDH Rairangpur New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
188 Cuttack NHPD SDH 9 SDH ATHAGARH New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
189 Ganjam NHPD SDH 10 SDH Bhanjanagar New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
190 Kandhamal HPD SDH 11 Baliguda SDH New work Construction of KMC wing 4.56 0.00 NA NA 2019-20 1.00 5.1.1.1.g
50.16 0.00 0.00 0.00 0.00 11.00
191.00
191 Kandhamal HPD CHC 1 Kotagarh New work Upgradation of CHC Building 25.00 0.00 0.00 0.00 2019-20 25.00 5.1.1.2.e
25.00 0.00 0.00 0.00 2019-20 25.00
25.00
192 Balasore NHPD PHC 1 Oupada PHC New work Upgradation of PHC Building 30.00 0.00 0.00 0.00 2019-20 30.00 5.1.1.2.f
193 Balangir HPD PHC(N) 2 Sibtala New work Upgradation of PHC Building 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.2.f
Sub Total
Sub Total of (5.1.1.2.e)
Sub Total
Up gradation/ Renovation work at PHC
Sub Total of (5.1.1.1.g)
Up gradation/ Renovation work at CHC
Page 143 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
194 Kandhamal HPD PHC(N) 3 Durgapanga New work Upgradation of PHC Building 40.00 0.00 0.00 0.00 2019-20 40.00 5.1.1.2.f
195 Kandhamal HPD PHC(N) 4 Judabali New work Upgradation of PHC Building (Labour room,
boundry wall & Equipment)32.00 0.00 0.00 0.00 2019-20 32.00 5.1.1.2.f
142.00 0.00 0.00 0.00 0.00 142.00
142.00
196 Balangir HPD SC 1 sahajbahal New work Electrification of SC Building 4.00 0.00 0.00 0.00 2019-20 4.00 5.1.1.2.g
4.00 0.00 0.00 0.00 2019-20 4.00
4.00
197 Balasore NHPD CHC 1 Basta 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
198 Balasore NHPD CHC 2 Khaira 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
199 Baragarh NHPD CHC 3 Attabira 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
200 Baragarh NHPD CHC 4 Barapali 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
201 Bhadrak NHPD CHC 5 Basudevpur 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
Sub Total
Up gradation/ Renovation work at SC
Spill over of Ongoing works - (Construction of Drug Ware House at CHC)
Sub Total of (5.1.1.2.f)
Sub Total of (5.1.1.2.g)
Sub Total
Page 144 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
202 Cuttack NHPD CHC 6 Bentakar 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
203 Gajapati HPD CHC 7 Kasinagar 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
204 Ganjam NHPD CHC 8 Kodala 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
205 Ganjam NHPD CHC 9 Belaguntha 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
206 Ganjam NHPD CHC 10 Khallikote 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
207 Kandhamal HPD CHC 11 G. Udayagiri 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
208 Kendrapada NHPD CHC 12 Pattamundai 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
209 Keonjhar HPD CHC 13 Banspal 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
210 Koraput HPD CHC 14 Boipariguda 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
211 Koraput HPD CHC 15 Kotapad 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
Page 145 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
212 Koraput HPD CHC 16 Nandapur 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
213 Mayurbhanj NHPD CHC 17 Bahalda 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 35.80 25.00 5.1.1.2.j
214 Mayurbhanj NHPD CHC 18 Sriram Ch. Pur 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
215 Nabarangpur HPD CHC 19 Sanamosigaon 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
216 Nuapada HPD CHC 20 Khariar 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 0.00 5.1.1.2.j
217 Rayagada HPD CHC 21 Muniguda 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
218 Rayagada HPD CHC 22 Kalyansinghpur 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 5.1.1.2.j
219 Sonepur NHPD CHC 23 Binika 2017-18 Construction of Drug Ware House at CHC 50.00 25.00 2017-18 25.00 25.00 5.1.1.2.j
1150.00 575.00 0.00 60.80 0.00 550.00
550.00
220 Angul NHPD SDH 1 SDH Athamalik 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 0.00 5.1.1.3.b
Spill over of Ongoing works - (Major Up gradation work of SDH)
Sub Total
Sub Total of (5.1.1.2.j)
Page 146 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
221 Balasore NHPD SDH 2 SDH Nilagiri 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
222 Cuttack NHPD SDH 3 SDH ATHAGARH 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
223 Cuttack NHPD SDH 4 SDH BANKI 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
224 Dhenkanal HPD SDH 5 Kamakhya Nagar SDH 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 0.00 5.1.1.3.b
225 Ganjam NHPD SDH 6 SDH Chatrapur 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
226 Ganjam NHPD SDH 7 SDH Bhanjanagar 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
227 Kandhamal HPD SDH 8 Baliguda SDH 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
228 Rayagada HPD SDH 9 Gunupur SDH 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 125.00 5.1.1.3.b
229 Sambalpur NHPD SDH 10 SDH Kuchinda 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 0.00 5.1.1.3.b
230 Sundargarh NHPD SDH 11 Bonai 2017-18Construction of 50 beded IPD building & OPD
complex250.00 125.00 2017-18 0.00 5.1.1.3.b
Page 147 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
231 Dhenkanal HPD SDH 12 Hindol SDH 2017-18 Upgradation of OPD building 100.00 50.00 2017-18 0.00 5.1.1.3.b
2850.00 1425.00 0.00 0.00 875.00
875.00
232 Nuapada HPD CHC 1 Khariar 2017-18 Construction of CHC Building 168.00 84.00 2017-18 0.00 5.1.1.3.c
233 Kendrapada NHPD CHC 2 Marsaghai CHC 2017-18 Construction of CHC Building 168.00 84.00 2017-18 84.00 5.1.1.3.c
234 Kendrapada NHPD CHC 3 Indupur CHC 2017-18 Construction of CHC Building 168.00 84.00 2017-18 84.00 5.1.1.3.c
235 Jajpur NHPD CHC 4 Mangalpur CHC 2017-18 Construction of CHC Building 168.00 84.00 2017-18 84.00 5.1.1.3.c
236 Malkangiri HPD CHC 5 Podia 2017-18 Construction of CHC Building 184.80 100.80 2017-18 84.00 5.1.1.3.c
237 Jharsuguda NHPD CHC 6 Kirimira CHC 2017-18 Construction of CHC Building 168.00 84.00 2017-18 84.00 5.1.1.3.c
1024.8 520.8 0 0 0 420.00
420.00
238 Angul NHPD SDH 1 Pallahada SDH 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 480.00 5.1.1.3.f
Sub Total
Spill over work Construction of CHC Building
Sub Total (5.1.1.3.c)
Sub Total of (5.1.1.3.b)
Sub Total
Additional requirement from previous work (MCH wing)
Page 148 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
239 BALASORE NHPD CHC 2 Basta CHC 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 480.00 5.1.1.3.f
240 BALASORE NHPD CHC 3 Soro CHC 2017-18 30 beded MCH wing 800.00 200.00 Up to 2017-
180 2019-20 480.00 5.1.1.3.f
241 Baragarh NHPD CHC 4 Sohela CHC 2017-18 30 beded MCH wing 800.00 200.00 Up to 2017-
180 2019-20 0.00 5.1.1.3.f
242 Bhadrak NHPD DHH 5 DHHBhadrak 2016-17 100 beded MCH wing 2228.15 475.00Up to 2017-
180 1402.52 5.1.1.3.f
243 Balangir HPD SDH 6 Patnagad SDH 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 0.00 5.1.1.3.f
244 Ganjam NHPD MCH 7 MKCG MCH 2014-15 100 beded MCH wing 2100.00 716.25Up to 2017-
1897.19 691.88 5.1.1.3.f
245 Jajpur NHPD CHC 8 Dangadi CHC 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 480.00 5.1.1.3.f
Page 149 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
246 Kalahandi HPD CHC 9 Kesinga CHC 2013-14 30 beded MCH wing 840.18 813.20Up to 2017-
18813.2 2018-19 26.98 5.1.1.3.f
247 Kalahandi HPD DHH 10 Bhawanipatana 2013-14 100 beded MCH wing 2104.57 2100.00Up to 2017-
182100 2018-19 4.57 5.1.1.3.f
248 Kendrapada NHPD DHH 11 DHH Kendrapada 2012-13 100 beded MCH wing 1927.68 800.00Up to 2017-
180 0.00 5.1.1.3.f
249 Kendrapada NHPD CHC 12 Patamundai CHC 2013-14 30 beded MCH wing 799.00 80.00Up to 2017-
1871.05 719.00 5.1.1.3.f
250 Keonjhar HPD SDH 13 Champua SDH 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 480.00 5.1.1.3.f
Page 150 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
251 Keonjhar HPD SDH 14 Anandapur SDH 2013-14 50 beded MCH wing 1164.03 1108.22Up to 2017-
181108.22 2019-20 55.81 5.1.1.3.f
252 Khurda NHPD DHH 15 DHH ,Khurdha 2013-14 100 beded MCH wing 2245.03 2237.00Up to 2017-
182237 2018-19 8.03 5.1.1.3.f
253 MAYURBHANJ NHPD SDH 16 Rairangpur SDH 2017-18 50 beded MCH wing 1125.00 281.25Up to 2017-
180 2019-20 675.00 5.1.1.3.f
254 Nabarangpur HPD CHC 17 Umerkote CHC 2017-18 30 beded MCH wing 800.00 200.00Up to 2017-
180 2019-20 480.00 5.1.1.3.f
255 Sambalpur NHPD MCH 18 VSSMC-Burla 2014-15 100 beded MCH wing 2100.00 255.00Up to 2017-
180 1476.00 5.1.1.3.f
256 Sonepur NHPD DHH 19 Soenpur DHH 2017-18 50 beded MCH wing 1125.00 281.25Up to 2017-
180 2019-20 675.00 5.1.1.3.f
Page 151 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
24158.64 10747.17 0 6426.66 0 8614.785
8614.785
257 Cuttack NHPD DHH 1 DHH Cuttack 2017-18 New construction of DVS 79.00 39.5 2017-18 29 2018-19 39.50 5.1.1.3.j
258 DEOGARH NHPD DHH 2 DHH Deogarh 2017-18 New construction of DVS 79.00 19.75 2017-18 2019-20 0.00 5.1.1.3.j
259 GANJAM NHPD DHH 3 DHH Ganjam 2017-18 New construction of DVS 79.00 19.75 2017-18 2019-20 0.00 5.1.1.3.j
260 Jajpur NHPD DHH 4 DHH Jajpur 2016-17 New construction of DVS 79.00 19.75 2017-18 0.00 5.1.1.3.j
261 Khurda NHPD NA 5UPHC, Niladrivihar,
Bhubaneswar2016-17
Construction of State Vaccine Store, with
Regional Vaccine Store82.28 60.1 2017-18 0.00 5.1.1.3.j
262 Mayurbhanj NHPD DHH 6 DHH,Baripada 2016-17 New construction of DVS 79.00 19.75 2017-18 59.25 5.1.1.3.j
263 Sonepur NHPD DHH 7 DHH Sonepur 2017-18 New construction of DVS 79.00 19.75 2017-18 2018-19 59.25 5.1.1.3.j
556.284 198.35 0 29 0 158.00
158.00
Sub Total of (5.1.1.3.f)
Sub Total of (5.1.1.3.j)
Sub Total
Ongoing/ Spillover work of District Vaccine Store
Sub Total
Carry forward of new construction of DHH initiated last year, or the year before
Page 152 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
279 Kendrapada NHPD DHH 1 DHH Kendrapada 2013-14 New DHH 11400 430Up to 2017-
183.32 2018-19 0.00 5.2.2.1
11400 430 Up to 2017-
183.32 2018-19 0
0
264 Kalahandi HPD SDH 2 Dharmagarh SDH New work Construction of OPD & IPD Complex 250.00 0.00 0.00 0.00 2019-20 125.00 5.2.1.2
250.00 0.00 0.00 0.00 2019-20 125.00
125.00
265 Kalahandi HPD CHC 1 Golmunda CHC New work Construction of OPD & IPD Complex 138.00 0.00 0.00 0.00 2019-20 69.00 5.2.1.3
266 Nayagarh NHPD CHC 3 Khandapada CHC New work Construction of OPD & IPD Complex 138.00 0.00 0.00 0.00 2019-20 69.00 5.2.1.3
276.00 0.00 0.00 0.00 0.00 138.00
138.00
267 Dhenkanal NHPD SC 1 Jamunakote New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
268 Cuttack NHPD SC 2 Mahanga New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
269 Cuttack NHPD SC 3 Lalitgiri New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
270 Cuttack NHPD SC 4 Sasilo New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
271 Cuttack NHPD SC 5 Jagannathpur New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
272 Cuttack NHPD SC 6 Kendupatna New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
273 Ganjam NHPD SC 7 Bikrampur New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
Sub Total
Sub Total of (5.2.1.3)
Sub Total of (5.2.1.2)
Sub Total
New construction New Hospital Building (OPD IPD Complex) at SDH
Sub Total
New construction New Hospital Building (OPD IPD Complex) at CHC
Sub Total of (5.2.2.1)
New construction (SC)
Page 153 of 280
Infrastructure - Annex II
Sl.
No.Name of the District
Whether
HPD or
not
Type of the
Facility Sr.No
Name of the
Facility
Year of
Sanction of
works
Type of work (New Facility/ Additional
Constructions/ Repair & Renovation/
MCH wings)
Total
Project Cost
(in Rs.
Lakhs)
Amount
Sanctione
d till 2017-
18 (Rs in
Lakh)
Year of
Amount
Sanctione
d
Expendit
ure to
date
Completio
n Year/
Estimated
year of
completio
n of work
Amount
Approved
for 2018-
19 (Rs in
Lakhs)
Budget
sheet Code
Detail Civil Construction 2018-19
274 Nabarangpur HPD SC 8 Murtuma New work Construction of SC Building 27.50 0.00 0.00 0.00 2019-20 27.50 5.2.1.5
220.00 0.00 0.00 0.00 0.00 220.00
220.00
275 GANJAM NHPD SDH 1 SDH Bhanjanagar New work 50 beded MCH wing 1125 0 NA NA 2020-21 562.5 5.2.1.6
276 JAGATSINGHAPUR NHPD DHH 2 Jagatsingpur DHH New work 50 beded MCH wing 1125 NA 2020-21 562.5 5.2.1.6
277 Jajpur NHPD CHC 3 Barachana CHC New work 30 beded MCH wing 800 NA 2020-21 400 5.2.1.6
278 BALASORE NHPD CHC 4 Simulia CHC New work 30 beded MCH wing 800 NA 2020-21 400 5.2.1.6
3850 0 0 0 0 1925.00
1925.00
280 Cuttack NHPD DHH 1 Sishu Bhawan Cuttack 2014-15 New Const. of DEIC for RBSK 104.29 45.8876 2014-15 23.00 2019-20 29.20 5.2.2.7
281 Khurda NHPD DHH 2 Capital Hospital 2014-15 New Const. of DEIC for RBSK 30 20Up to 2017-
1820.23 2019-20 10.00 5.2.2.7
282 Mayurbhanj NHPD DHH 3 DHH Baripada 2014-15 New Const. of DEIC for RBSK 128 111Up to 2017-
1873.00 2019-20 17.00 5.2.2.7
262.29 176.8876 0 116.23 0 56.20
56.20
54614.17 14073.21 6636.01 21658.99
21658.99
Sub Total
Spill over of Ongoing works\ (DEIC) RBSK
Sub Total
Sub Total
New MCH wings (to be initiated this year)
Sub Total of (5.2.1.5)
Sub Total of (5.2.1.6)
Sub Total of (5.2.2.7)
Grand Total (line Item Wise)
Page 154 of 280
Infrastructure Annex-III
Sl. No. Name of the District Type of the Facility Name of the Facility Type of workTotal Approved Amount
(in Rs. Lakhs)1 Deogarh DHH DHH, Deogarh Construction of New External PH work 50.00
DHH Total 50.00
2 Balangir SDH Patnagarh Upgradation of Water supply system 3.00
3 Balangir SDH Titlagarh Upgradation of Water supply system 3.00
4 Balasore SDH Nilgiri SDH Water Supply 10.00
SDH Total 16.00
5 Gajapati CHC Mohana Water supply 5.00
6 Gajapati CHC Chandagiri Water supply 5.00
7 Gajapati CHC R.Udyagiri Water supply 5.00
8 Gajapati CHC B.K Pada Water supply 5.00
9 Gajapati CHC Gumma Water supply 5.00
10 Nayagarh CHC CHC Khandapada Water supply 3.00
11 Balangir CHC Saintala Upgradation of Water supply system 15.00
12 Balangir CHC Agalpur Upgradation of Water supply system 3.00
13 Balangir CHC Loisingha Upgradation of Water supply system 3.00
14 Balangir CHC Jamgaon Upgradation of Water supply system 3.00
15 Balangir CHC Deogaon Upgradation of Water supply system 3.00
16 Balangir CHC Gudvela Upgradation of Water supply system 3.00
17 Balangir CHC Kholan Upgradation of Water supply system 3.00
18 Balangir CHC Muribahal Upgradation of Water supply system 3.00
19 Balangir CHC Sindhekela Upgradation of Water supply system 3.00
20 Balangir CHC Belpara Upgradation of Water supply system 3.00
21 Balangir CHC Ghasian Upgradation of Water supply system 3.00
22 Balangir CHC Khaprakhol Upgradation of Water supply system 3.00
23 Balangir CHC Turekela Upgradation of Water supply system 3.00
24 Balangir CHC Chudapali Upgradation of Water supply system 3.00
25 Balangir CHC Kantabanji Upgradation of Water supply system 3.00
26 Balasore CHC Soro Water Supply 6.00
27 Balasore CHC GKBhatter Water Supply 6.00
28 Balasore CHC Baliapal Water Supply 5.00
29 Balasore CHC Jaleswarpur Water Supply 5.00
30 Ganjam CHC CHC Aska
Maintenance of Water supply with New constructiuon of 50,000 ltr
Over head tank 30.00
31 Ganjam CHC CHC Sheragada
Maintenance of Water supply with New constructiuon of 50,000 ltr
Over head tank 30.00
32 Ganjam CHC CHC Badagada
Maintenance of Water supply with New constructiuon of 50,000 ltr
Over head tank 30.00
33 Ganjam CHC CHC K S Nagar
Maintenance of Water supply with New constructiuon of 50,000 ltr
Over head tank 30.00
34 Ganjam CHC CHC Kukudakhandi Provision of water supply to existing quarters 5.00
35 Ganjam CHC CHC Adapada Provision of water supply to existing quarters 5.00
36 Kandhamal CHC CHC Daringbadi 24x7 Water supply 30.00
37 Kandhamal CHC CHC Tumudibandha 24x7 Water supply 20.00
38 Kendrapara CHC CHC Marshaghai Water supply 5.00
39 Kendrapara CHC CHC Indupur Water supply 5.00
40 Kendrapara CHC CHC Derabish Water supply 5.00
41 Kendrapara CHC CHC Rajnagar Water supply 10.00
42 Subarnapur CHC CHC,Ullunda Water supply system by Over head tank 10.00
5.3.18 Water Supply
Page 155 of 280
Infrastructure Annex-III
Sl. No. Name of the District Type of the Facility Name of the Facility Type of workTotal Approved Amount
(in Rs. Lakhs)CHC Total 322.00
43 Balangir PHC(N) PHC(N) Kusang Water supply(Bore well with Over head Tank) 1.47
44 Balangir PHC(N) PHC(N) Badimunda Water supply(Bore well with Over head Tank) 1.47
59 Balasore PHC(N) Basantisindhia Watersupply 1.47
45 Bhadrak PHC(N) Aradi Water supply 2.36
46 Bhadrak PHC(N) Eram Water supply 2.36
47 Boudh PHC(N) PHC(N)Ghantapada Upgradation of water supply system 0.89
48 Boudh PHC(N) PHC(N)Ambajhari Upgradation of water supply system 0.89
49 Boudh PHC(N) PHC(N) Sagada Upgradation of water supply system 0.89
60 Gajapati PHC(N) Birikote Water supply 1.47
61 Gajapati PHC(N) Ramagiri Water supply 1.47
62 Gajapati PHC(N) P.Govindapur Water supply 1.47
63 Gajapati PHC(N) Adaba Water supply 1.47
64 Gajapati PHC(N) Chudangapur Water supply 1.47
65 Gajapati PHC(N) Cheligada Water supply 1.47
66 Gajapati PHC(N) Nuagada Water supply 1.47
67 Gajapati PHC(N) Garabandha Water supply 1.47
68 Gajapati PHC(N) Gaiba Water supply 1.47
69 Gajapati PHC(N) Koinpur Water supply 1.47
70 Gajapati PHC(N) Baijhal Water supply 1.47
71 Gajapati PHC(N) Loba Water supply 1.47
50 Ganjam PHC(N) PHC(N) Dhukapada under Polasara block
New PH facility with OHT & installation of new borewell and
rennovation of existing sanitary units 0.89
51 Ganjam PHC(N) PHC(N) Pathara under Khallikote block
Installation of new borewell and replacement of external PH &
sanitary fittings 0.89
52 Ganjam PHC(N) PHC(N) Kulagada under Sheragada block
Provision of water supply with OHT with borewell.to Res and Non-res
buildings 1.47
53 Ganjam PHC(N) PHC(N) Sunadei under Rangeilunda block Provision of water supply with OHT with borewell 1.47
54 Ganjam PHC(N) PHC(N) Mantridi under Rangeilunda block Provision of water supply with OHT with borewell 1.47
55 Ganjam PHC(N) PHC(N) Goutami under Sanakhemundi block Provision of water supply with OHT and borewell 0.89
56 Ganjam PHC(N) PHC(N) Athagada patna under K S Nagar block Provision of water supply with OHT and borewell 0.89
57 Ganjam PHC(N) PHC(N) Humma under Ganjam block Provision of water supply with OHT and borewell 0.89
58 Ganjam PHC(N) PHC(N) Suralo under Provision of water supply with OHT and borewell 0.89
72 Kendrapara PHC(N) PHC (N) JNP Sasan Water Supply 1.47
73 Kendrapara PHC(N) PHC (N) Talachua Water Supply 2.21
74 Kendrapara PHC(N) PHC (N) Batipada Water Supply 2.21
75 Kendrapara PHC(N) PHC (N) Dangamal Water Supply 2.21
76 Kendrapara PHC(N) PHC (N) Gupti Water Supply 2.21
77 Kendrapara PHC(N) PHC (N) Iswarpur Water Supply 1.47
78 Kendrapara PHC(N) PHC (N) Nankar Water Supply 1.47
79 Kendrapara PHC(N) PHC (N) Babar Water Supply 1.47
80 Kendrapara PHC(N) PHC (N) Kalapada Water Supply 1.47
81 Kendrapara PHC(N) PHC (N) Tikhiri Water Supply 1.47
82 Kendrapara PHC(N) PHC (N) Ayeba Water Supply 1.47
83 Kendrapara PHC(N) PHC (N) Chandan Nagar Water Supply 1.47
84 Kendrapara PHC(N) PHC (N) Badapada Water Supply 1.47
85 Kendrapara PHC(N) PHC (N) Tulasidia Water Supply 1.47
86 Kendrapara PHC(N) PHC (N) Harianka Water Supply 1.47
87 Kendrapara PHC(N) PHC (N) Gobindapur Water Supply 2.21
Page 156 of 280
Infrastructure Annex-III
Sl. No. Name of the District Type of the Facility Name of the Facility Type of workTotal Approved Amount
(in Rs. Lakhs)88 Kendrapara PHC(N) PHC (N) Dasipur Water Supply 2.21
89 Kendrapara PHC(N) PHC (N) Mahu Water Supply 2.21
90 Kendrapara PHC(N) PHC (N) Sanamanga Water Supply 2.21
91 RAYAGADA PHC(N) PHC(N),liktipadar Water supply system 0.89
92 RAYAGADA PHC(N) PHC(N),Ukumba Construction of water provision 0.89
93 RAYAGADA PHC(N) PHC(N),Rugududubai Construction of water provision 0.88
PHC(N) Total 75.70
94 Boudh SC Gochhapada Upgradation of water supply system 3.00
95 Boudh SC Kharbhuin Upgradation of water supply system 3.00
96 Ganjam SC SC Biswanatha pur under Rangeilunda block Provision of water supply with OHT and borewell 1.50
97 Ganjam SC SC Birikote under Bhanjanagar block Provision of water supply with OHT and borewell 1.50
98 Ganjam SC SC Kadua under J N Prasad block Provision of water supply with OHT and borewell 1.50
99 Ganjam SC SC Belapur under Buguda block Provision of water supply with OHT and borewell 1.50
100 Ganjam SC SC Sahaspur under Aska block Provision of water supply with OHT and borewell 1.50
101 Ganjam SC SC Subalaya under K S Nagar block Provision of water supply with OHT and borewell 1.50
102 Ganjam SC SC Burupada under Ganjam block Provision of water supply with OHT and borewell 2.50
103 Ganjam SC SC Digapada under Beguniapada block Provision of water supply with OHT and borewell 2.50
104 Ganjam SC SC Phasi under Beguniapada block Provision of water supply with OHT and borewell 2.50
105 Ganjam SC SC Talasara under Beguniapada block Provision of water supply with OHT and borewell 2.50
106 Ganjam SC SC B. Pandiripada under Polasara block Provision of water supply with OHT and borewell 2.50
107 Ganjam SC SC Mundamarei under Polasara block Provision of water supply with OHT and borewell 2.50
108 Ganjam SC SC Raipur under Purusottampur block Provision of water supply with OHT and borewell 2.50
109 Ganjam SC SC Pandia under Purusottampur block Provision of water supply with OHT and borewell 2.50
110 Ganjam SC SC Kurula under Sheragada block Provision of water supply with OHT and borewell 1.50
111 Ganjam SC SC Khamara under Sheragada block Provision of water supply with OHT and borewell 1.50
112 Ganjam SC SC Govindapur under Sheragada block Provision of water supply with OHT and borewell 1.50
113 Ganjam SC SC Ramachandrapur under Sheragada block Provision of water supply with OHT and borewell 1.50
114 Ganjam SC SC Kushapalli under Ganjam block Provision of water supply with OHT and borewell 1.50
115 Ganjam SC SC Pallur under Ganjam block Provision of water supply with OHT and borewell 1.50
116 Ganjam SC SC Tarinipalli under Ganjam block Provision of water supply with OHT and borewell 1.50
117 Ganjam SC SC Ralaba under Hinjilicut block Provision of water supply with OHT and borewell 1.50
118 Ganjam SC SC Benapata under Aska block Provision of water supply with OHT and borewell 1.50
119 Nayagarh SC SC Baunsagada New const. Of External PH work 4.00
120 Nayagarh SC SC Saradhapur New const. Of PH work 4.00
121 Nayagarh SC SC Bhagabanpur New const. Of PH work 4.00
122 Nayagarh SC SC Chadeyapalli New const. Of PH 4.00
123 Nayagarh SC SC Pancharida New const. Of PH work 4.00
124 Nayagarh SC SC Ghugudipada New const. Of PH 4.00
125 Nayagarh SC Kantilo PHC(N) Construction of water supply 4.50
126 RAYAGADA SC Haduguda SC New connection of water provision 3.50
127 RAYAGADA SC Gogupadu SC New connection of water provision 3.50
SC Total 84.00
Grand Total 547.70
Page 157 of 280
Infrastructure Annex-IV
Sl. No. Name of the District Type of the Facility Name of the Facility Type of workTotal Approved Amount
(in Rs. Lakhs)1 Bhadrak DHH DHH Installation of Transformer at DTU/PPC , DHH 10.00
2 Bhadrak DHH DHH Construction of a room for Electric main panel board at DHH,Bhadrak 2.50
3 Gajapati DHH DHH Electrification 5.00
4 Subarnapur DHH DHH Provision of 2 Nos. Generator 25 KV at DHH,Subarnapur 20.00
5 Subarnapur DHH DHH Peripheri lighting to DHH,Subarnapur 10.00
DHH Total 47.50
6 Angul SDH Athamallik 35 KVA DG set with Panel board 8.00
7 Angul SDH Pallahara 35 KVA DG set with Panel board 8.00
SDH Total 16.00
8 Angul CHC Bantala 35 KVA DG set with Panel board 6.00
9 Angul CHC Banarpal 35 KVA DG set with Panel board 6.00
10 Angul CHC Khamar 35 KVA DG set with Panel board 6.00
11 Angul CHC R.K Nagar 35 KVA DG set with Panel board 6.00
12 Angul CHC Madhapur 35 KVA DG set with Panel board 6.00
13 Balasore CHC Hatigarha Electrification 5.00
14 Deogarh CHC CHC, Barkote Installation of separate transfermer 7.00
15 Deogarh CHC CHC, Bamparda Installation of separate transfermer 7.00
16 Deogarh CHC CHC, Chhatabar Installation of separate transfermer 7.00
17 Deogarh CHC CHC, Tileibani Installation of separate transfermer 7.00
18 Gajapati CHC B.K Pada Electrification 4.00
19 Gajapati CHC Gumma Electrification 4.00
20 Gajapati CHC Rayagada Electrification 4.00
21 Ganjam CHC CHC Sumandala 3 phase internal & external electrification 5.00
22 Ganjam CHC CHC Bhatakumarada 3 phase internal & external electrification 5.00
23 Ganjam CHC CHC Kukudakhandi 3 Phase electrical connection 5.00
24 Ganjam CHC CHC Adapada 3 Phase electrical connection 5.00
25 Ganjam CHC CHC Khandadeuli 3 Phase electrical connection 5.00
26 Kandhamal CHC CHC K. Nuagaon 3 Phase electrical connection 5.00
27 Kandhamal CHC CHC Tumudibandha 3 Phase electrical connection 5.00
28 RAYAGADA CHC CHC,Kasipur 25 KVA Transfermor with 3 phase wiring 7.00
29 RAYAGADA CHC CHC,Bisam katak 25 KVA Transfermor with 3 phase wiring 7.00
30 RAYAGADA CHC CHC,Kolnora 25 KVA Transfermor with 3 phase wiring 7.00
31 RAYAGADA CHC CHC,K.singpur 25 KVA Transfermor with 3 phase wiring 7.00
32 RAYAGADA CHC CHC,Padmapur 25 KVA Transfermor with 3 phase wiring 7.00
33 RAYAGADA CHC CHC,Ramnaguda 25 KVA Transfermor with 3 phase wiring 7.00
34 RAYAGADA CHC CHC,Chandrapur 25 KVA Transfermor with 3 phase wiring 7.00
35 RAYAGADA CHC CHC,Jagannathpur 25 KVA Transfermor with 3 phase wiring 7.00
36 Subarnapur CHC CHC Ulunda Peripheri lighting to CHC 7.00
37 Subarnapur CHC CHC Ulunda Provision of Generator 25 KV 7.00
38 Subarnapur CHC CHC Naikenpai Peripheri lighting 7.00
39 Subarnapur CHC CHC Naikenpai Provision of Generator 25 KV 7.00
40 Subarnapur CHC CHC Binka Provision of Generator 25 KV & Peripheri lighting 10.00
CHC Total 204.00
41 Angul PHC(N) Purunagarh 3.5 KV Inverter with dual battery 1.00
42 Angul PHC(N) Thakurgarh 3.5 KV Inverter with dual battery 1.00
43 Angul PHC(N) Jarpada 3.5 KV Inverter with dual battery 1.00
44 Angul PHC(N) Bajrakote 3.5 KV Inverter with dual battery 1.00
45 Angul PHC(N) Boinda 3.5 KV Inverter with dual battery 1.00
5.3.18 Electrification
Page 158 of 280
Infrastructure Annex-IV
Sl. No. Name of the District Type of the Facility Name of the Facility Type of workTotal Approved Amount
(in Rs. Lakhs)46 Balasore PHC(N) Basantisindhia Electrification 5.00
47 Balasore PHC(N) Bahabalpur Electrification 5.00
48 Bhadrak PHC(N) Dhamara Electrification to PHC(N) Dhamara 6.00
49 Bhadrak PHC(N) Bahabalpur Electrification to PHC(N) Bahabalpur 4.50
50 Bhadrak PHC(N) Tiadisahi Electrification to PHC(N) Tiadisahi 3.50
51 Bhadrak PHC(N) Rahania Electrification to PHC(N) Rahania 3.50
52 Bolangir PHC(N) PHC(N) Bendra Internal Electrification of Ward 3.00
53 Boudh PHC(N) PHC (N) Talagaon Major Electrification at staff qtr 6.00
54 Boudh PHC(N) PHC (N) Baghiapada Major Electrification at staff qtr 4.00
55 Boudh PHC(N) PHC (N) Ambajhari Major Electrification work at 4.00
56 Gajapati PHC(N) Birikote Electrification 5.00
57 Gajapati PHC(N) Adaba Electrification 5.00
58 Gajapati PHC(N) Baijhal Electrification 5.00
59 Gajapati PHC(N) Loba Electrification 5.00
60 Ganjam PHC(N) PHC(N) Jagamohan Internal electrification 1.00
61 Ganjam PHC(N) PHC(N) U D S Pur New facility of both External and internal Electrification 3.00
PHC(N) Total 73.50
62 Bhadrak SC SC Kaupur Electrification 2.50
63 Ganjam SC SC Ramachandrapur New facility of both External and internal Electrification 2.00
64 Ganjam SC SC Padmapur Internal Electrification 1.00
65 Ganjam SC SC Padmapur External Electrification 1.00
SC Total 6.50
Grand Total 347.50
Page 159 of 280
NPCDCS Glucometer Annex
Target PopulationTotal Cost
(In Lakhs.)Target Population
Total Cost
(In Lakhs.)Targeted Population
Total Cost
(In Lakhs.)
Total Targeted
Population
Grand
Total Cost
1 Angul 1371954 24809 507623 101525 8.12 54574 4.37 156099 12.49 7.6 4.89
2 Balasore 2537610 48773 938916 187783 15.02 107290 8.58 295073 23.61 13.85 9.76
3 Baragarh 1580196 28412 584673 116935 9.35 62500 5.00 179435 14.35 8.84 5.51
4 Bhadrak 1632902 34085 604174 120835 9.67 74980 6.00 195815 15.67 8.99 6.68
5 Bolangir 1877653 40163 694732 138946 11.12 88350 7.07 227296 18.18 9.84 8.34
6 Boudh 490875 14761 181624 36325 2.91 32471 2.60 68796 5.50 2.63 2.87
7 Cuttack 2166694 43435 801677 521090 41.69 95547 7.64 616637 49.33 29.51 19.82
8 Deogarh 340689 6478 126055 25211 2.02 14250 1.14 39461 3.16 1.87 1.29
9 Dhenkanal 1285162 27357 475510 95102 7.61 60179 4.81 155281 12.42 7.12 5.30
10 Gajapati 621069 12771 229796 45959 3.68 28093 2.25 74052 5.92 3.45 2.47
11 Ganjam 3799188 74198 1405700 913705 73.10 163219 13.06 1076924 86.15 51.71 34.44
12 Jagatsinghpur 1195155 21736 442207 88441 7.08 47814 3.83 136255 10.90 6.79 4.11
13 Jajpur 1975949 36344 731101 146220 11.70 79949 6.40 226169 18.09 10.91 7.18
14 Jharsuguda 630684 11014 233353 46671 3.73 24228 1.94 70899 5.67 3.46 2.21
15 Kalahandi 1753878 36066 648935 421808 33.74 79337 6.35 501145 40.09 23.1 16.99
16 Kandhamal 795377 17342 294289 58858 4.71 38149 3.05 97007 7.76 4.38 3.38
17 Kendrapara 1541822 29156 570474 114095 9.13 64137 5.13 178232 14.26 8.6 5.66
18 Keonjhar 1977545 41687 731692 146338 11.71 91702 7.34 238040 19.04 10.75 8.29
19 Khurda 1474212 28487 545458 354548 28.36 62665 5.01 417213 33.38 20.02 13.36
20 Koraput 1525588 39096 564468 112894 9.03 86003 6.88 198897 15.91 8.23 7.68
21 Malkanagiri 693120 17404 256454 51291 4.10 38285 3.06 89576 7.17 3.66 3.51
22 Mayurbhanj 2737010 55716 1012694 202539 16.20 122563 9.81 325102 26.01 15.04 10.97
23 Nawarangpur 1364078 34252 504709 100942 8.08 75347 6.03 176289 14.10 7.29 6.81
24 Nayagarh 1034856 21707 382897 76579 6.13 47751 3.82 124330 9.95 5.75 4.20
25 Nuapada 668823 15343 247465 49493 3.96 33751 2.70 83244 6.66 3.64 3.02
26 Puri 1842499 32937 681725 443121 35.45 72454 5.80 515575 41.25 24.89 16.36
27 Rayagada 1068232 24837 395246 256910 20.55 54636 4.37 311546 24.92 14.18 10.74
28 Sambalpur 1118455 21496 413828 268988 21.52 47286 3.78 316274 25.30 15.25 10.05
29 Sonepur 660305 14056 244313 48863 3.91 30920 2.47 79783 6.38 3.64 2.74
30 Sundargarh 2286130 42050 845868 169174 13.53 92501 7.40 261675 20.93 12.49 8.44
31 Cuttack City 665585 13343 246266 160073 12.81 29352 2.35 189425 15.15 8.94 6.21
32 Bhubaneswar City 1051932 20327 389215 252990 20.24 44717 3.58297707 23.82 12.97 10.85
Total 45765227 929638 16933137 3593233 287.46 2281019 182.48 2045000 163.60 7919252 633.54 369.39 264.15
District wise Glucometer & Lancet Annex
Total Requirement 2018-19 Fund
approved
in 2017-18
Additional fund
Requirement
2018-19
Sl. No DistrictDistrict wise
Population
Target Population
(37% of total
Population)
Population based Screening for 7 districts & 2
Municipal Corporations:
(65% of Target Population)
Institutional Screening in other districts (20% of
Target Population)Excepted ANC
Cases
ANC Cases for GDM
Page 160 of 280
8.1. Human Resources
ExisitingNe
wTotal
8.1.1.1 B.30.1.1ANMs (Base rationalized as per State
decision) - under RCH1150 1150 10,644 532 11,176 2,794 13,970 1,927.86 1,349.50
SNs (Base rationalized as per State
decision)2443 0 2443 5,263.10 3,684.17
Under RCH 2388 2388 13,678 684 14,362 3,591 17,953 5,144.61 3,601.23
B14.3.2.1 Day Care Center (Hemoglobinopathy) 6 6 13,678 684 14,362 3,591 17,953 12.93 9.05
Under NPCDCS 1 1 13,678 684 14,362 3,591 17,953 2.15 1.51
Under NPHCE 48 48 13,678 684 14,362 3,591 17,953 103.41 72.39
Laboratory Technicians (Base rationalized
as per State decision)344 4 348 603.46 422.42
Under RCH 147 147 11,011 551 11,562 2,891 14,453 254.95 178.47
Under Sickle cell 15 15 11,011 551 11,562 2,891 14,453 26.02 18.21
B14.3.2.1 Under Day Care Center (Hemoglobinopathy) 3 3 11,011 551 11,562 2,891 14,453 5.20 3.64
Under IDSP 10 10 11,011 551 11,562 2,891 14,453 17.34 12.14
Under RNTCP 167 167 11,011 551 11,562 2,891 14,453 289.64 202.75
Under NPCDCS 1 1 11,011 551 11,562 2,891 14,453 1.73 1.21
Under NPPCF 3 3 11,562 2,891 14,453 3.90 2.73
Under NIDDCP 1 1 11,562 2,891 14,453 1.30 0.91
Sr. LT (RNTCP) 1 1 21,427 1,071 22,498 5,625 28,123 3.37 2.36
Pharmacist (Base rationalized as per State
decision)2 0 2 5.11 3.58
Under Sickle cell 1 1 11,011 551 11,562 2,891 14,453 1.73 1.21
Pharmacist (State, dealing with programme -
RNTCP)1 1 21,427 1,071 22,498 5,625 28,123 3.37 2.36
8.1.1.10 B.30.1.9Physiotherapist/ Occupational Therapist
under RCH79 79 24,696 1,235 25,931 6,483 32,414 307.28 215.10
8.1.1.3.a B.30.1.11 Psychiatric Nurse 23 23 15,215 761 15,976 3,994 19,970 55.12 38.58
8.1.1.3.c B.30.1.11 Community Nurse/ Supervisor 23 23 15,215 761 15,976 3,994 19,970 55.12 38.58
8.1.3.1B.30.3.1/B.30.
2.4
Physician/Consultant Medicine under
NPHCE5 5 63,000 3,150 66,150 16,538 10,000 92,688 55.61 38.93
Ophthalmologists under NPCB 3 0 3 33.37 23.36
At KBK 3 3 63,000 3,150 66,150 16,538 10,000 92,688 33.37 23.36
8.1.3.8 B.30.3.7 Microbiologists (MD) (RNTCP) 2 2 56,007 2,800 58,807 14,702 73,509 17.64 12.35
B.30.5 Medical Officers (35 positions dropped) 59 0 59 484.29 339.00
Medical Officers at Day Care Center
(Hemoglobinopathy)
At KBK district 1 1 50,400 2,520 52,920 13,230 10,000 76,150 9.14 6.40
At Non-KBK district 2 2 50,400 2,520 52,920 13,230 66,150 15.88 11.11
Under NMHP
At KBK district 6 6 50,400 2,520 52,920 13,230 10,000 76,150 54.83 38.38
At Non-KBK district 8 8 50,400 2,520 52,920 13,230 66,150 63.50 44.45
Under NPCDCS
Total amount per
annum (Rs. In lakhs)
Total amount
proposed (70%)
8.1. Human Resources
New FMR Old FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive
8.1.1.2
8.1.1.5
Total
B.30.1.4
B.30.1.4
B.30.1.2
B.30.1.2
8.1.5
8.1.1.8 B.30.1.7
8.1.3.5 B.30.3.4
B14.3.2.1
B.30.5Page 161 of 280
8.1. Human Resources
ExisitingNe
wTotal
Total amount per
annum (Rs. In lakhs)
Total amount
proposed (70%)
8.1. Human Resources
New FMR Old FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
At KBK district 10 10 50,400 2,520 52,920 13,230 10,000 76,150 91.38 63.97
At Non-KBK district 11 11 50,400 2,520 52,920 13,230 66,150 87.32 61.12
Under RNTCP (DTC (15) & Sr. MO-DRTB
Centre (4))
At KBK district 5 5 48,510 2,426 50,936 12,734 3,000 66,670 40.00 28.00
At Non-KBK district 14 14 48,510 2,426 50,936 12,734 63,670 106.97 74.88
Under Sickle Cell 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
AYUSH MOs 1485 0 1485 5,081.33 3,556.93
At KBK district 412 412 20,880 1,044 21,924 5,481 4,000 31,405 1,552.66 1,086.86
At Non-KBK district 1073 1073 20,880 1,044 21,924 5,481 27,405 3,528.67 2,470.07
8.1.6.3 B.30.6.3Others (Multipurpose worker (Masseur) for
Pancha Karma unit at DHH)2 2 4,000 4,000 0.96 0.96
8.1.7.1 B.30.7.1 RBSK mobile teams
MOs- AYUSH 1272 0 1272 4,378.94 3,065.26
At KBK district 408 408 20,880 1,044 21,924 5,481 4,000 31,405 1,537.59 1,076.31
At Non-KBK district 864 864 20,880 1,044 21,924 5,481 27,405 2,841.35 1,988.95
8.1.7.1.d B.30.7.1.dANMs (Base rationalized as per State
decision) 636 636 10,644 532 11,176 2,794 13,970 1,066.19 746.33
8.1.7.1.e B.30.7.1.ePharmacist (Base rationalized as per State
decision)636 636 11,011 551 11,562 2,891 14,453 1,103.05 772.14
8.1.7.2 B.30.7.2 DEIC
Paediatrician 32 0 32 330.72 231.51
At KBK district 11 11 63,000 3,150 66,150 16,538 10,000 92,688 122.35 85.64
At Non-KBK district 21 21 63,000 3,150 66,150 16,538 82,688 208.37 145.86
MO, MBBS 32 0 32 267.22 187.05
At KBK district 11 11 50,400 2,520 52,920 13,230 10,000 76,150 100.52 70.36
At Non-KBK district 21 21 50,400 2,520 52,920 13,230 66,150 166.70 116.69
8.1.7.2.c B.30.7.2.c MO, Dental 32 32 33,957 1,698 35,655 8,914 44,569 171.14 119.80
8.1.7.2.d B.30.7.2.dSNs (Base rationalized as per State
decision)32 32 13,678 684 14,362 3,591 17,953 68.94 48.26
Physiotherapist 32 0 32 125.79 88.05
At KBK district 11 11 24,696 1,235 25,931 6,483 1,000 33,414 44.11 30.87
At Non-KBK district 21 21 24,696 1,235 25,931 6,483 32,414 81.68 57.18
Audiologist & speech therapist 32 0 32 125.79 88.05
At KBK district 11 11 24,696 1,235 25,931 6,483 1,000 33,414 44.11 30.87
At Non-KBK district 21 21 24,696 1,235 25,931 6,483 32,414 81.68 57.18
Psychologist 32 0 32 81.84 57.29
At KBK district 11 11 15,976 799 16,775 4,194 1,000 21,969 29.00 20.30
At Non-KBK district 21 21 15,976 799 16,775 4,194 20,969 52.84 36.99
Optometrist 32 0 32 65.77 46.04
At KBK district 11 11 12,789 639 13,428 3,357 1,000 17,785 23.48 16.43
At Non-KBK district 21 21 12,789 639 13,428 3,357 16,785 42.30 29.61
Early interventionist cum special educator 32 0 32 81.84 57.29
8.1.5
8.1.6.1 B.30.6.1
B.30.5
8.1.7.1.a B.30.7.1.a
8.1.7.2.a B.30.7.2.a
8.1.7.2.b B.30.7.2.b
8.1.7.2.e B.30.7.2.e
8.1.7.2.f B.30.7.2.f
8.1.7.2.g B.30.7.2.g
8.1.7.2.h B.30.7.2.h
8.1.7.2.i B.30.7.2.i
Page 162 of 280
8.1. Human Resources
ExisitingNe
wTotal
Total amount per
annum (Rs. In lakhs)
Total amount
proposed (70%)
8.1. Human Resources
New FMR Old FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
At KBK district 11 11 15,976 799 16,775 4,194 1,000 21,969 29.00 20.30
At Non-KBK district 21 21 15,976 799 16,775 4,194 20,969 52.84 36.99
8.1.7.2.k B.30.7.2.kLab technician (Base rationalized as per
State's decision)32 32 11,011 551 11,562 2,891 14,453 55.50 38.85
8.1.7.2.l B.30.7.2.lDental technician (Base rationalized as per
State's decision)32 32 11,011 551 11,562 2,891 14,453 55.50 38.85
8.1.8 B.30.8 Staff for NRC
8.1.8.3 B.30.8.3 Cook cum caretaker 201 201 7,277 364 7,641 1,910 9,551 230.37 161.26
Medical Social worker for NRC 67 0 67 163.68 114.58
At KBK district 26 26 15,215 761 15,976 3,994 1,000 20,970 65.43 45.80
At Non-KBK district 41 41 15,215 761 15,976 3,994 19,970 98.25 68.78
8.1.8.6 B.30.8.5Others - ANM (Base rationalized as per
State's decision)272 272 10,644 532 11,176 2,794 13,970 455.98 319.19
8.1.9 B.30.9 Staff for SNCU/ NBSU
Medical Officers 155 0 155 1,290.39 903.27
Medical Officers at SNCU 155 0 155 1,290.39 903.27
At KBK district 50 50 50,400 2,520 52,920 13,230 10,000 76,150 456.90 319.83
At Non-KBK district 105 105 50,400 2,520 52,920 13,230 66,150 833.49 583.44
Staff Nurse (Base rationalized as per State's
decision)994 0 994 2,141.43 1,499.00
12 beded @ 10 SN 300 300 13,678 684 14,362 3,591 17,953 646.31 452.42
24 beded @ 20 SN 220 220 13,678 684 14,362 3,591 17,953 473.96 331.77
36 beded @ 30 SN 90 90 13,678 684 14,362 3,591 17,953 193.89 135.72
48 beded @ 40 SN 40 40 13,678 684 14,362 3,591 17,953 86.17 60.32
NBSU @ 4 SN 180 180 13,678 684 14,362 3,591 17,953 387.78 271.45
KMC unit @ 4 SN 164 164 13,678 684 14,362 3,591 17,953 353.32 247.32
8.1.9.4Others - ANM (Base rationalized as per
State's decision)0 0 11,176 2,794 13,970 - -
8.1.11 B.30.10 Staff for MMU/ MHV
8.1.11.1 B.30.10.1 Medical Officers 3 3 50,400 2,520 52,920 13,230 10,000 76,150 27.41 19.19
8.1.11.2 B.30.10.2SNs (Base rationalized as per State's
decision)3 3 13,678 684 14,362 3,591 17,953 6.46 4.52
8.1.11.3 B.30.10.3Pharmacist (Base rationalized as per State's
decision)3 3 11,011 551 11,562 2,891 14,453 5.20 3.64
8.1.11.4 B.30.10.4Lab technician (Base rationalized as per
State's decision)6 6 11,011 551 11,562 2,891 14,453 10.41 7.28
8.1.11.5 B.30.10.5 Others -Driver 3 3 11,025 551 11,576 2,894 14,470 5.21 3.65
8.1.13 B.30.11 Other Staff
Counsellor 143 0 143 346.89 242.82
At KBK district 35 35 15,215 761 15,976 3,994 1,000 20,970 88.07 61.65
At Non-KBK district 108 108 15,215 761 15,976 3,994 19,970 258.81 181.17
Psychologist 46 0 46 180.61 126.42
Clinical Psychologist under NMHP
At KBK district 7 7 24,696 1,235 25,931 6,483 1,000 33,414 28.07 19.65
At Non-KBK district 16 16 24,696 1,235 25,931 6,483 32,414 62.23 43.56
B.30.8.4
8.1.13.2 B.30.11.2
8.1.7.2.i B.30.7.2.i
8.1.13.1 B.30.11.1
8.1.9.3 B.30.9.3
B.30.9.28.1.9.2
8.1.8.4
Page 163 of 280
8.1. Human Resources
ExisitingNe
wTotal
Total amount per
annum (Rs. In lakhs)
Total amount
proposed (70%)
8.1. Human Resources
New FMR Old FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
Psychiatric Social worker under NMHP
At KBK district 7 7 24,696 1,235 25,931 6,483 1,000 33,414 28.07 19.65
At Non-KBK district 16 16 24,696 1,235 25,931 6,483 32,414 62.23 43.56
8.1.13.4 B.30.3.7 Microbiologists under IDSP 26 26 38,850 1,943 40,793 10,198 50,991 159.09 111.36
8.1.13.6 B.30.11.3 Multi Rehabilitation worker under NPHCE 59 59 15,215 761 15,976 3,994 19,970 141.39 98.97
Social Worker 33 0 33 84.35 59.05
At KBK district 11 11 15,975 799 16,774 4,194 1,000 21,968 29.00 20.30
At Non-KBK district 22 22 15,975 799 16,774 4,194 20,968 55.36 38.75
TBHV 71 0 71 143.68 100.58
At KBK district 7 7 12,789 639 13,428 3,357 800 17,585 14.77 10.34
At Non-KBK district 64 64 12,789 639 13,428 3,357 16,785 128.91 90.24
Lab Attendant/ Assistant 16 0 16 19.45 13.61
Lab Assistant under IDSP 8 8 8,820 441 9,261 2,315 11,576 11.11 7.78
Lab Attendant under IDSP 8 8 6,615 331 6,946 1,737 8,683 8.34 5.83
Ophthalmic Assistant/ Refractionist under
NPCB55 0 55 111.45 78.02
At KBK district 7 7 12,789 639 13,428 3,357 800 17,585 14.77 10.34
At Non-KBK district 48 48 12,789 639 13,428 3,357 16,785 96.68 67.68
8.1.14 B.30.12 Blood Bank/ BSU/Mobile Blood Vehicle
8.1.14.1 B.30.12.1 Doctor - Pathologist 9 9 50,400 2,520 52,920 13,230 10,000 76,150 82.24 57.57
8.1.14.4 B.30.12.4Blood Bank Technician (Base rationalized as
per State's decision)78 78 11,011 551 11,562 2,891 14,453 135.28 94.70
Others 18 0 18 31.74 22.22
Counsellor cum Public Relation Officer 9 9 15,215 761 15,976 3,994 1,000 20,970 22.65 15.85
Attendant (Unit rate revised as per minimum
wage rate)9 9 8,415 8,415 9.09 6.36
8.1.15 B.30.13 Administrative Staff
Medical Records Asstt./ Case Registry Asstt.
Under NMHP23 0 23 32.62 22.84
At KBK district 7 7 8,820 441 9,261 2,315 800 12,376 10.40 7.28
At Non-KBK district 16 16 8,820 441 9,261 2,315 11,576 22.23 15.56
8.1.16 B.30.14 Support Staff for Health Facilities
8.1.16.1 B.30.11.9General Duty Attendant/ Hospital Worker
under NPHCE32 32 9,482 474 9,956 2,489 12,445 47.79 33.45
8.1.15.7 B.30.13.7
8.1.13.2 B.30.11.2
8.1.13.8 B.30.11.4
8.1.13.11 B.30.11.7
8.1.13.10 H.12
8.1.13.16 B.30.11.13
8.1.14.5 B.30.12.5
Page 164 of 280
RNTCP Annex-PPP Scheme
Dist Popn. amount
Total
Slide(symptomat
ic)
Dist.
Total slides to
be collected
through
scheme (20%)
Dist.LT as per HR
norm
MO@ Rs. 20000
per month
Contingency
@ 10% of
Total Cost
Total Amount
required
Target
Popn.
(slum)
Rs. 75000/-
per 35000
popn
Rs. 1500 per
case (min 15
cases)
contingenc
y @15%
Total
Amount
Approved
Dist.
Total
Amount
required
1 Anugul 1371954 1 75732 18933 1214 1 243 18933
3 Balasore 2537610 1 140076 35019 0 0 1 154632 240000 39463 434095 1 170095 639209
4 Bargarh 1580196 1 87227 21807 0 0 1 154632 240000 39463 434095 0 455902
6 Bhadrak 1632902 1 90136 22534 1445 1 289 0 0 0 1 170095 192629
2 Bolangir 1877653 1 103646 25912 0 0 1 154632 240000 39463 434095 0 460007
5 Boudh 490875 1 27096 6774 0 0 0 1 170095 176869
7 Cuttack 2832279 1 156342 39086 0 0 0 0 39086
8 Deogarh 340689 1 18806 4702 0 0 1 154632 240000 39463 434095 0 438797
9 Dhenkanal 1285162 1 70941 17735 0 0 0 0 17735
10 Gajapati 621069 1 34283 8571 0 0 0 1 170095 178666
11 Ganjam 3799188 1 209715 52429 0 0 0 0 0 2 340190 392619
12 Jagatsinghpur 1195155 1 65973 16493 0 0 0 0 16493
13 Jajpur 1975949 1 109072 27268 0 0 1 154632 240000 39463 434095 0 461363
14 Jharsuguda 630684 1 34814 8704 558 1 112 1 154632 240000 39463 434095 0 0 2 340190 782989
15 Kalahandi 1753878 1 96814 24204 1552 1 310 1 154632 240000 39463 434095 0 458299
16 Kandhamal 795377 1 43905 10976 0 0 0 0 10976
17 Kendrapara 1541822 1 85109 21277 1365 1 273 0 0 21277
18 Keonjhar 1977545 1 109160 27290 1754 1 351 0 2 340190 367480
19 Khurda 1570144 1 86672 21668 0 0 0 0 21668
20 Koraput 1525588 1 84212 21053 1350 1 270 0 0 0 2 340190 361243
21 Malkangiri 693120 1 38260 9565 613 1 123 1 154632 240000 39463 434095 0 0 1 170095 613755
22 Mayurbhanj 2737010 1 151083 37771 0 0 0 5 850476 888247
23 Nawarangpur 1364078 1 75297 18824 1207 1 241 0 0 0 0 18824
24 Nayagarh 1034856 1 57124 14281 0 0 0 0 14281
25 Nuapada 668823 1 36919 9230 0 0 0 0 9230
26 Puri 1842499 1 101706 25427 1631 1 326 1 154632 240000 39463 434095 0 0 2 340190 799712
27 Rayagada 1068232 1 58966 14742 945 1 189 0 2 340190 354932
28 Sambalpur 1118455 1 61739 15435 990 1 198 1 154632 240000 39463 434095 1 170095 619625
29 Sonepur 660305 1 36449 9112 584 1 117 1 154632 240000 39463 434095 0 0 0 443207
30 Sundargarh 2286130 1 126194 31549 0 0 1 154632 240000 39463 434095 10 1700952 2166596
31 CHB 956000 1 52771 13193 0 0 662000 1418571 45000 219536 1683107 2 340190 2036490
Total 45765227 31 2526239 631564 15208 13 3042 12 1855584 2880000 473556 5209140 662000 1418571 45000 219536 1683107 35 5953328 13477139
NGP/PP Scheme
Sl No Dist.
Mid Year
Population
2018
ACSM Diagnosis & treatmentProgramme
Management
Total
ACSM at community level DMC (A)DMC -cum- treatment Centre (B)
Improving TB control in Urban slum (F)
LT scheme
(Strengthening
diagnostic services)
Page 165 of 280
Sl. No. Component UnitCost Estimate
(Monthly)
Cost Estimate
(Annual)Remarks
1 Fixed cost
1.1 MO, MBBS 1 76,150 9,13,800
At KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) - Rs.2520/- = Base
2018-19 @Rs.52920/- + PI (Max 25%) - Rs.13230/- + Rs.10000/- KBK allowance =
Rs.76150/- p.m.
At Non-KBK district : 2017-18 Base - Rs.50400/- + Increment (5%) - Rs.2520/- =
Base 2018-19 @Rs.52920/- + PI (Max 25%) - Rs.13230/- = Rs.66150/- p.m.
1.2 AYUSH Doctor 1 31,405 3,76,860
At KBK district : 2017-18 Base - Rs.20880/- + Increment (5%) - Rs.1044/- = Base
2018-19 @Rs.21924/- + PI (Max 25%) - Rs.5481/- + Rs.4000/- KBK allowance =
Rs.31405/- p.m.
At Non-KBK district : 2017-18 Base - Rs.20880/- + Increment (5%) - Rs.1044/- =
Base 2018-19 @Rs.21924/- + PI (Max 25%) - Rs.5481/- = Rs.27405/- p.m.
1.3 ANM 1 13,970 1,67,640
2017-18 Base - Rs.10644/- (Base rationalized as per State decision) + Increment
(5%) - Rs.532/- = Base 2018-19 @Rs.11176/- + PI (Max 25%) - Rs.2794/- =
Rs.13970/- p.m.
1.4 Pharmacist 1 14,453 1,73,436
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- =
Rs.14453/- p.m.
1.5 Lab Technician 1 14,453 1,73,436
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- =
Rs.14453/- p.m.
1.6 Attendant-cum-Sweeper : 1 8,415 1,00,980
19,06,152
2
Operational expenses :(contingency /stationary /supportive
supervision/internal meeting / documentation/ audit/mobile
allowance to staff/other miscellaneous etc. (5 % of the total
manpower cost)
1,00,440
20,06,592
3 Performance based Incentive Cost (Max) 9,93,408
Reference: the GoI prescibed Service level Agreement for PHC Management (D.O
No. Z.18015/22/2015-NHM-II, dated 25.5.2016. 50% of the received incentive cost
shall be paid to PHC staff and remaining would be used by the concessionaire for
the upkeep of the facility and further improvement.
30,00,000
Sub Total
Total Fixed Cost
Grand Total
PHC (N) management projects under PPP
Page 166 of 280
16.8 Programme Management (HR)
Existing New Total
1 Angul 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
2 Balasore 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 1 1 60000 720000 1.80
3 Baragarh 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
4 Bhadrak 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
5 Bolangir 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 1 1 60000 720000 1.80
6 Boudh 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
7 Cuttack 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
8 Deogarh 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
9 Dhenkanal 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
10 Gajapati 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
11 Ganjam 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 1 1 60000 720000 1.80
12 Jagatsinghpur 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
13 Jajpur 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
14 Jharsuguda 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
15 Kalahandi 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
16 Kandhamal 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0.00
17 Kendrapara 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
18 Keonjhar 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
19 Khurda 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
20 Koraput 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
Programme Managers
16.8.2.1.1
Total
amount
Approved
(70%)
DistrictSl.
No.
Total
amount per
annum (Rs.
In lakhs)
TotalKBK
incentive
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
No. of
position
No. of position
Project Officer - Operation at Regional level - e-VIN (Budget Approved for 3
months)
Remuneratio
n Per Month
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved for
3 months
District level HR under RMNCH+A & HSS
District Programme Manager
Page 167 of 280
16.8 Programme Management (HR)
Existing New Total
Programme Managers
16.8.2.1.1
Total
amount
Approved
(70%)
DistrictSl.
No.
Total
amount per
annum (Rs.
In lakhs)
TotalKBK
incentive
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
No. of
position
No. of position
Project Officer - Operation at Regional level - e-VIN (Budget Approved for 3
months)
Remuneratio
n Per Month
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved for
3 months
District Programme Manager
21 Malkanagiri 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
22 Mayurbhanj 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
23 Nawarangpur 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
24 Nayagarh 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
25 Nuapada 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
26 Puri 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
27 Rayagada 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
28 Sambalpur 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 1 1 60000 720000 1.80
29 Sonepur 1 48,510 2,426 50,936 12,734 3,000 66,670 8.00 5.60 0
30 Sundargarh 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35 0
31 Cap Hosp 0
32 RGH 0
33 SCB 0
34 MKCG 0
35 VSS 0
36 SVPPGIP 0
37 PRMMCH MBJ 0
38 SLNMCH KPT 0
39 AHRCC Cuttack 0
40 State 1 1 60000 720000 1.80
Total 30 233.172 163.2204 0 5 5 300000 3600000 9.00
Page 168 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Exis
tingNew
Tota
l
Exis
tingNew
Tota
l
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 2 2 31,201 1,560 32,761 8,190 40,951 9.83 6.88
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
Programme Managers
16.8.2.1.1
Total
amount
Approve
d (70%)
Asst. Manager IEC/BCC & Training
Increme
nt (5%)
Revised
Base
Deputy Manager RCH
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
PI (Max
25%)Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
No. of position
Base
2017-18
District level HR under RMNCH+A & HSS
Page 169 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Exis
tingNew
Tota
l
Exis
tingNew
Tota
l
Programme Managers
16.8.2.1.1
Total
amount
Approve
d (70%)
Asst. Manager IEC/BCC & Training
Increme
nt (5%)
Revised
Base
Deputy Manager RCH
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
PI (Max
25%)Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
No. of position
Base
2017-18
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 2 2 31,201 1,560 32,761 8,190 40,951 9.83 6.88
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 0 0 31,201 1,560 32,761 8,190 40,951 - 0.00
1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00
1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
0
0
0
0
0
0
0
0
0
0
30 0 30 183.413 128.389 15 0 15 74.7918 52.3543
Page 170 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
Programme Managers
16.8.2.1.1
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Asst. Manager Legal Affairs & Institutional Strengthening
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
District level HR under RMNCH+A & HSS
Total
amount
Approve
d (70%)
Asst. Manager RBSK/RKSK
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Page 171 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Programme Managers
16.8.2.1.1
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Asst. Manager Legal Affairs & Institutional Strengthening
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
Asst. Manager RBSK/RKSK
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
30 0 30 149.8 104.86 35 0 35 174.37 122.059
Page 172 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existin
gNew Total
3 3 20,837 1,042 21,879 5,470 27,349 9.85 6.89
1 1 20,837 1,042 21,879 5,470 27,349 3.28 2.30
1 1 20,837 1,042 21,879 5,470 27,349 3.28 2.30
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
2 2 20,837 1,042 21,879 5,470 1200 28,549 6.85 4.80
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
1 1 20,837 1,042 21,879 5,470 1200 28,549 3.43 2.40
1 1 20,837 1,042 21,879 5,470 1200 28,549 3.43 2.40
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
1 1 20,837 1,042 21,879 5,470 1200 28,549 3.43 2.40
Programme Managers
16.8.2.1.1
KBK
incentiv
e
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
Sr. Hospital Manager
No of
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
District level HR under RMNCH+A & HSS
No. of position
Base
2017-18
Total
amount
Approve
d (70%)
Jr. Hospital Manager at SDH
Page 173 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existin
gNew Total
Programme Managers
16.8.2.1.1
KBK
incentiv
e
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
Sr. Hospital Manager
No of
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
No. of position
Base
2017-18
Total
amount
Approve
d (70%)
Jr. Hospital Manager at SDH
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
3 3 20,837 1,042 21,879 5,470 27,349 9.85 6.89
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
0 0 20,837 1,042 21,879 5,470 27,349 - 0.00
1 1 20,837 1,042 21,879 5,470 1200 28,549 3.43 2.40
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
0 0 20,837 1,042 21,879 5,470 1200 28,549 - 0.00
2 2 20,837 1,042 21,879 5,470 27,349 6.56 4.59
1 78,829 3,941 82,770 20,693 1,03,463 12.42 8.69
26 0 26 86.1929 60.335 1 12.42 8.69
Page 174 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
Programme Managers
16.8.2.1.1
Total
amount
Approv
ed
(70%)
No. of position
Hospital Manager at MCH & other institutions
Total
amount
Approv
ed
(70%)
No. of position
Hospital Manager at district
Total
amount
per
annum
(Rs. In
lakhs)
Total
KBK
incent
ive
PI (Max
25%)
Increme
nt (5%)
Base
2017-18
District level HR under RMNCH+A & HSS
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
KBK
incentiv
e
PI (Max
25%)
Revised
Base
Page 175 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Programme Managers
16.8.2.1.1
Total
amount
Approv
ed
(70%)
No. of position
Hospital Manager at MCH & other institutions
Total
amount
Approv
ed
(70%)
No. of position
Hospital Manager at district
Total
amount
per
annum
(Rs. In
lakhs)
Total
KBK
incent
ive
PI (Max
25%)
Increme
nt (5%)
Base
2017-18
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
KBK
incentiv
e
PI (Max
25%)
Revised
Base
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
2 2 31,201 1,560 32,761 8,190 40,951 9.83 6.88
2 2 31,201 1,560 32,761 8,190 40,951 9.83 6.88
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46 0
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46 0
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46 0
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46
2 2 38,367 1,918 40,285 10,071 50,356 12.09 8.46
12 0 12 72.51 50.76 34 0 34 169.46 118.62
Page 176 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Exist
ingNew Total
Exist
ing
Ne
wTotal
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 48.06 33.65
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 48.22 34.29
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 46.42 32.49
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 53.73 38.15
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 0 0 31,201 1,560 32,761 8,190 1800 42,751 - 0.00 34.82 24.37
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 49.70 34.79
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 44.78 31.35
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 39.95 27.96
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 2 2 31,201 1,560 32,761 8,190 40,951 9.83 6.88 61.33 43.47
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 48.50 33.95
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 48.50 33.95
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 49.70 34.79
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 48.50 33.95
Total
amoun
t
Appro
ved
(70%)
Programme Managers
16.8.2.1.1
No. of position Total
amount
Approve
d (70%)
No. of position
Grand
Total
amount
Approv
ed
(70%)
Asst. Manager, GKS & Health System StregtheningAsst. Manager ASHA
Base
2017-
18
KBK
incenti
ve
PI
(Max
25%)
Revised
Base
Increm
ent
(5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
District level HR under RMNCH+A & HSS
Increme
nt (5%)
Revised
Base
PI
(Max
25%)
KBK
incent
ive
Total
Grand
Total
amount
Require
ment
per
annum
(Rs. In
lakhs)
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
Page 177 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Exist
ingNew Total
Exist
ing
Ne
wTotal
Total
amoun
t
Appro
ved
(70%)
Programme Managers
16.8.2.1.1
No. of position Total
amount
Approve
d (70%)
No. of position
Grand
Total
amount
Approv
ed
(70%)
Asst. Manager, GKS & Health System StregtheningAsst. Manager ASHA
Base
2017-
18
KBK
incenti
ve
PI
(Max
25%)
Revised
Base
Increm
ent
(5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
Increme
nt (5%)
Revised
Base
PI
(Max
25%)
KBK
incent
ive
Total
Grand
Total
amount
Require
ment
per
annum
(Rs. In
lakhs)
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 39.95 27.96
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 57.89 40.53
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 39.95 27.96
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 38.22 26.75
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 39.95 27.96
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 43.13 30.19
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 48.50 33.95
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 46.58 33.15
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.59 39.95 27.96
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44 49.70 34.79
14.74 10.32
14.74 10.32
17.00 11.90
17.00 11.90
17.00 11.90
12.09 8.46
12.09 8.46
12.09 8.46
12.42 8.69
1.80 1.80
30 0 30 104.86 30 0 30 104.71 1464.51 1027.85
Page 178 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew
Tota
l
Existi
ngNew Total
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
No. of position Total
amount
Approv
ed
(70%)
Epidemiologist
Revised Base 2018-19: Rs. 59,039/- PM ( with Medical Background)
Revised Base 2018-19 : Rs. 55,566/- PM (without Medical Background)
Consultants/ Programme Officers
16.8.2.1.2
District level HR under RMNCH+A & HSS
MIS/ IT Staff
16.8.2.1.5
No. of position Total
amount
Approve
d (70%)
District Data Manager
KBK
incenti
ve
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
Total
KBK
incen
tive
PI (Max
25%)
Revised
Base
Increm
ent
(5%)
Base 2017-
18
Total
amount
per
annum
(Rs. In
lakhs)
Total
Page 179 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew
Tota
l
Existi
ngNew Total
No. of position Total
amount
Approv
ed
(70%)
Epidemiologist
Revised Base 2018-19: Rs. 59,039/- PM ( with Medical Background)
Revised Base 2018-19 : Rs. 55,566/- PM (without Medical Background)
Consultants/ Programme Officers
16.8.2.1.2
MIS/ IT Staff
16.8.2.1.5
No. of position Total
amount
Approve
d (70%)
District Data Manager
KBK
incenti
ve
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
Total
KBK
incen
tive
PI (Max
25%)
Revised
Base
Increm
ent
(5%)
Base 2017-
18
Total
amount
per
annum
(Rs. In
lakhs)
Total
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
1 1 56,228 2,811 59,039 14,760 3,000 76,799 9.22 6.45 1 1 38,147 1,907 40,054 10,014 2400 52,468 6.30 4.41
1 1 52,920 2,646 55,566 13,892 69,458 8.33 5.83 1 1 38,147 1,907 40,054 10,014 50,068 6.01 4.21
30 0 30 259.74 181.82 30 0 30 183.41 128.39
Page 180 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Existing New Total
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
6 6 13,230 662 13,892 3,473 17,365 12.50 8.75 18.51 12.96
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
7 7 13,230 662 13,892 3,473 17,365 14.59 10.21 20.59 14.42
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
7 7 13,230 662 13,892 3,473 17,365 14.59 10.21 20.59 14.42
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
Block Data Manager (Urban) (Base rationalized as per State decision)
District level HR under RMNCH+A & HSS
MIS/ IT Staff
16.8.2.1.5
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
Grand Total
amount
Approved
(70%)
No. of positionTotal amount
Approved
(70%)
Page 181 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Existing New Total
Block Data Manager (Urban) (Base rationalized as per State decision)
MIS/ IT Staff
16.8.2.1.5
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
Grand Total
amount
Approved
(70%)
No. of positionTotal amount
Approved
(70%)
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.18 7.12
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 8.09 5.66
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 8.48 5.93
3 3 13,230 662 13,892 3,473 17,365 6.25 4.38 12.26 8.58
50 0 50 105.25 73.67 288.66 202.06
Page 182 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 4 4 15,215 761 15,976 3,994 19,970 9.59 6.71
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 7 7 15,215 761 15,976 3,994 19,970 16.77 11.74
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 5 5 15,215 761 15,976 3,994 19,970 11.98 8.39
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 5 5 15,215 761 15,976 3,994 19,970 11.98 8.39
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 6 6 15,215 761 15,976 3,994 1000 20,970 15.10 10.57
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 4 4 15,215 761 15,976 3,994 1000 20,970 10.07 7.05
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 9 9 15,215 761 15,976 3,994 19,970 21.57 15.10
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 3 3 15,215 761 15,976 3,994 19,970 7.19 5.03
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 8 8 15,215 761 15,976 3,994 19,970 19.17 13.42
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 4 4 15,215 761 15,976 3,994 1000 20,970 10.07 7.05
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 11 11 15,215 761 15,976 3,994 19,970 26.36 18.45
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 3 3 15,215 761 15,976 3,994 19,970 7.19 5.03
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 7 7 15,215 761 15,976 3,994 19,970 16.77 11.74
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 4 4 15,215 761 15,976 3,994 19,970 9.59 6.71
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 8 8 15,215 761 15,976 3,994 1000 20,970 20.13 14.09
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 9 9 15,215 761 15,976 3,994 1000 20,970 22.65 15.85
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 2 2 15,215 761 15,976 3,994 19,970 4.79 3.35
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 10 10 15,215 761 15,976 3,994 19,970 23.96 16.77
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 8 8 15,215 761 15,976 3,994 19,970 19.17 13.42
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 5 5 15,215 761 15,976 3,994 1000 20,970 12.58 8.81
KBK
incentiv
e
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
Total
Incre
ment
(5%)
Base 2017-
18
Total
amount
per
annum
(Rs. In
lakhs)
Total
District level HR under RMNCH+A & HSS
16.8.2.1.7
Accounts Staff
No. of position Total
amount
Approve
d (70%)
District Accounts Manager
No. of position Total
amount
Approve
d (70%)
Accountant-cum- DEO at DPMU
KBK
incenti
ve
PI (Max
25%)
Revised
Base
Page 183 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
KBK
incentiv
e
PI (Max
25%)
Revised
Base
Increme
nt (5%)
Base
2017-18
Total
amount
per
annum
(Rs. In
lakhs)
Total
Incre
ment
(5%)
Base 2017-
18
Total
amount
per
annum
(Rs. In
lakhs)
Total
16.8.2.1.7
Accounts Staff
No. of position Total
amount
Approve
d (70%)
District Accounts Manager
No. of position Total
amount
Approve
d (70%)
Accountant-cum- DEO at DPMU
KBK
incenti
ve
PI (Max
25%)
Revised
Base
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 6 6 15,215 761 15,976 3,994 1000 20,970 15.10 10.57
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 9 9 15,215 761 15,976 3,994 19,970 21.57 15.10
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 4 4 15,215 761 15,976 3,994 1000 20,970 10.07 7.05
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 6 6 15,215 761 15,976 3,994 19,970 14.38 10.06
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 3 3 15,215 761 15,976 3,994 1000 20,970 7.55 5.28
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 13 13 15,215 761 15,976 3,994 19,970 31.15 21.81
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 5 5 15,215 761 15,976 3,994 1000 20,970 12.58 8.81
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 4 4 15,215 761 15,976 3,994 19,970 9.59 6.71
1 1 41,675 2,084 43,759 10,940 2400 57,099 6.85 4.80 4 4 15,215 761 15,976 3,994 1000 20,970 10.07 7.05
1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59 8 8 15,215 761 15,976 3,994 19,970 19.17 13.42
0
0
30 0 30 200.08 140.06 184 0 184 447.90 313.53
Page 184 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
Total
amount
Approv
ed
(70%)
Accountant-cum-DEO at DHH
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t per
annum
(Rs. In
lakhs)
District level HR under RMNCH+A & HSS
16.8.2.1.7
Accounts Staff
Base 2017-
18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incentiv
e
No. of position Total
amount
Approv
ed
(70%)
Finance & Logistic Assistant (NVBDCP)
Total
KBK
incenti
ve
PI (Max
25%)
Revised
Base
Increm
ent
(5%)
Base 2017-
18
No. of position
Page 185 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Total
amount
Approv
ed
(70%)
Accountant-cum-DEO at DHH
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t per
annum
(Rs. In
lakhs)
16.8.2.1.7
Accounts Staff
Base 2017-
18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incentiv
e
No. of position Total
amount
Approv
ed
(70%)
Finance & Logistic Assistant (NVBDCP)
Total
KBK
incenti
ve
PI (Max
25%)
Revised
Base
Increm
ent
(5%)
Base 2017-
18
No. of position
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 17,530 877 18,407 4,602 1200 24,209 2.91 2.03 1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76
1 1 17,530 877 18,407 4,602 23,009 2.76 1.93 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
30 0 30 84.42 59.09 32 0 32 78.00 54.60
Page 186 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
3 3 15,215 761 15,976 3,994 19,970 7.19 5.03 28.50 19.95
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 30.89 21.62
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 26.10 18.27
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 23.70 16.59
2 2 15,215 761 15,976 3,994 1000 20,970 5.03 3.52 32.40 22.68
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 22.34 15.64
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 38.08 26.66
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 18.91 13.24
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 35.69 24.98
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 22.34 15.64
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 42.87 30.01
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 18.91 13.24
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 28.50 19.95
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 21.31 14.91
1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76 34.92 24.44
1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76 37.44 26.21
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 16.51 11.56
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 40.48 28.33
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 30.89 21.62
1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76 27.37 19.16
Base 2017-
18
Increment
(5%)Revised Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount per
annum (Rs.
In lakhs)
District level HR under RMNCH+A & HSS
16.8.2.1.7
Accounts Staff
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
Grand Total
amount
Approved
(70%)
No. of position Total
amount
Approved
(70%)
Accountant-cum-DEO at SDH
Page 187 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Base 2017-
18
Increment
(5%)Revised Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount per
annum (Rs.
In lakhs)
16.8.2.1.7
Accounts Staff
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
Grand Total
amount
Approved
(70%)
No. of position Total
amount
Approved
(70%)
Accountant-cum-DEO at SDH
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 27.37 19.16
3 3 15,215 761 15,976 3,994 19,970 7.19 5.03 40.48 28.33
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 22.34 15.64
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 26.10 18.27
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 19.82 13.88
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 42.87 30.01
1 1 15,215 761 15,976 3,994 1000 20,970 2.52 1.76 27.37 19.16
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 26.10 18.27
0 0 15,215 761 15,976 3,994 1000 20,970 0.00 0.00 22.34 15.64
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 35.69 24.98
2.40 1.68
2.40 1.68
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
26 0 26 63.03 44.12 873.43 611.40
Page 188 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 3 3 13,230 662 13,892 3,473 800 18,165 6.54 4.58
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 3 3 13,230 662 13,892 3,473 800 18,165 6.54 4.58
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
Total
amount
per
annum
(Rs. In
lakhs)
Office Assistant at DPMU DEO at DPMU
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
No. of position
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
16.8.2.1.8
Administrative Staff
District level HR under RMNCH+A & HSS
Data Entry Operation
16.8.2.1.9
Page 189 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Total
amount
per
annum
(Rs. In
lakhs)
Office Assistant at DPMU DEO at DPMU
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
No. of position
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
16.8.2.1.8
Administrative Staff Data Entry Operation
16.8.2.1.9
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 3 3 13,230 662 13,892 3,473 800 18,165 6.54 4.58
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 3 3 13,230 662 13,892 3,473 800 18,165 6.54 4.58
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.10
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 3 3 13,230 662 13,892 3,473 17,365 6.25 4.38
1 1 13,230 662 13,892 3,473 800 18,165 2.18 1.53 3 3 13,230 662 13,892 3,473 800 18,165 6.54 4.58
1 1 13,230 662 13,892 3,473 17,365 2.08 1.46 4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
30 63.57 44.50 106 0 106 224.63 157.24
Page 190 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 10.90 7.63
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 10.90 7.63
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
Grand Total
amount
Approved
(70%)
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
DEO at DHH
District level HR under RMNCH+A & HSS
Data Entry Operation
16.8.2.1.9
Page 191 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
Grand Total
amount
Approved
(70%)
Grand Total
amount
Requirement
per annum
(Rs. In lakhs)
DEO at DHH
Data Entry Operation
16.8.2.1.9
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 10.90 7.63
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 10.90 7.63
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 13.08 9.16
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 10.42 7.29
2 2 13,230 662 13,892 3,473 800 18,165 4.36 3.05 10.90 7.63
2 2 13,230 662 13,892 3,473 17,365 4.17 2.92 12.50 8.75
5 5 13,230 662 13,892 3,473 17,365 10.42 7.29 10.42 7.29
4 4 13,230 662 13,892 3,473 17,365 8.34 5.83 8.34 5.83
13 13 13,230 662 13,892 3,473 17,365 27.09 18.96 27.09 18.96
13 13 13,230 662 13,892 3,473 17,365 27.09 18.96 27.09 18.96
15 15 13,230 662 13,892 3,473 17,365 31.26 21.88 31.26 21.88
3 3 13,230 662 13,892 3,473 17,365 6.25 4.38 6.25 4.38
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
113 0 113 237.58 166.31 462.21 323.55
Page 192 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 4 4 27,783 1,389 29,172 7,293 36,465 17.50 12.25
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 4 4 27,783 1,389 29,172 7,293 36,465 17.50 12.25
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 2 2 27,783 1,389 29,172 7,293 36,465 8.75 6.13
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 5 5 27,783 1,389 29,172 7,293 1600 38,065 22.84 15.99
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 1 1 27,783 1,389 29,172 7,293 1600 38,065 4.57 3.20
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 5 5 27,783 1,389 29,172 7,293 36,465 21.88 15.32
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 1 1 27,783 1,389 29,172 7,293 36,465 4.38 3.06
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 2 2 27,783 1,389 29,172 7,293 1600 38,065 9.14 6.39
2 2 37,375 1,869 39,244 9,811 49,055 11.77 8.24 7 7 27,783 1,389 29,172 7,293 36,465 30.63 21.44
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 2 2 27,783 1,389 29,172 7,293 36,465 8.75 6.13
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 4 4 27,783 1,389 29,172 7,293 1600 38,065 18.27 12.79
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 4 4 27,783 1,389 29,172 7,293 1600 38,065 18.27 12.79
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 4 4 27,783 1,389 29,172 7,293 36,465 17.50 12.25
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 5 5 27,783 1,389 29,172 7,293 1600 38,065 22.84 15.99
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amou
nt
Appro
ved
(70%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
Asst. Engineer Work Consultant
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 193 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amou
nt
Appro
ved
(70%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
Asst. Engineer Work Consultant
Other Staff
16.8.2.1.11
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 2 2 27,783 1,389 29,172 7,293 1600 38,065 9.14 6.39
2 2 37,375 1,869 39,244 9,811 49,055 11.77 8.24 9 9 27,783 1,389 29,172 7,293 36,465 39.38 27.57
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 3 3 27,783 1,389 29,172 7,293 1600 38,065 13.70 9.59
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 2 2 27,783 1,389 29,172 7,293 1600 38,065 9.14 6.39
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 4 4 27,783 1,389 29,172 7,293 36,465 17.50 12.25
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 4 4 27,783 1,389 29,172 7,293 1600 38,065 18.27 12.79
1 1 37,375 1,869 39,244 9,811 49,055 5.89 4.12 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
1 1 37,375 1,869 39,244 9,811 2400 51,455 6.17 4.32 2 2 27,783 1,389 29,172 7,293 1600 38,065 9.14 6.39
2 2 37,375 1,869 39,244 9,811 49,055 11.77 8.24 6 6 27,783 1,389 29,172 7,293 36,465 26.25 18.38
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
33 197.43 138.20 106 0 106 470.36 329.25
Page 194 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
Sr. Health Manager (O&G Spl.) Sr. Manager Scientific Officer
Sickle Cell Project
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 195 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base
2017-18
Incremen
t (5%)
Revised
Base
PI (Max
25%)
Total Per
Month
Sr. Health Manager (O&G Spl.) Sr. Manager Scientific Officer
Sickle Cell Project
Other Staff
16.8.2.1.11
1 56,007 2,800 58,807 14,702 73,509 1 41,454 2,073 43,527 10,882 54,409 2 41,454 2,073 43,527 10,882 54,409
1 73509 1 54409 2 54409
Page 196 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
Accounts Officer (Jr.) Research Assistant Office Assistant
Sickle Cell Project
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 197 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
No. of
staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
Accounts Officer (Jr.) Research Assistant Office Assistant
Sickle Cell Project
Other Staff
16.8.2.1.11
1 31,201 1,560 32,761 8,190 40,951 2 24,696 1,235 25,931 6,483 32,414 1 13,230 662 13,892 3,473 17,365
1 40951 2 32414 1 17365
Page 198 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
No. of staffBase 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
MonthNo. of staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
- -
- -
- -
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
- -
- -
- -
Sickle Cell Project
Total amount
per annum (Rs.
In lakhs)
Programme Assistant Computer Operator (DEO) (Base rationalized as per State decision)Total amount
Approved
(70%)
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 199 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
No. of staffBase 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
MonthNo. of staff
Base 2017-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Total Per
Month
Sickle Cell Project
Total amount
per annum (Rs.
In lakhs)
Programme Assistant Computer Operator (DEO) (Base rationalized as per State decision)Total amount
Approved
(70%)
Other Staff
16.8.2.1.11
- -
- -
- -
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
- -
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
- -
- -
- -
- -
1 13,230 662 13,892 3,473 17,365 2 24,696 1,235 25,931 6,483 32,414 53.05 37.13
1 17365 14 421382 99.72 69.81
Page 200 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
0 0 31,201 1,560 32,761 8,190 40,951 - 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.45 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.60 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 1 1 31,201 1,560 32,761 8,190 40,951 3.69 2.59 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.45 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.60 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
1 1 31,201 1,560 32,761 8,190 1800 42,751 5.13 3.60 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incent
ive
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increme
nt (5%)
Regional Vaccine & Cold Chain Manager Logistic Manager (Logistic, PROMIS & Immunisation)
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 201 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incent
ive
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increme
nt (5%)
Regional Vaccine & Cold Chain Manager Logistic Manager (Logistic, PROMIS & Immunisation)
Other Staff
16.8.2.1.11
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
0 0 31,201 1,560 32,761 8,190 40,951 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.45 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 31,201 1,560 32,761 8,190 1800 42,751 0.00 0.00 1 1 24,696 1,235 25,931 6,483 1600 34,014 4.08 2.86
1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.45 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 - 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 0 - 0.00 0.00 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
0 - 0.00 0.00 0 0 24,696 1,235 25,931 6,483 32,414 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
0 - 0.00 0.00 - 0.00 0.00
1 1 31,245 1,562 32,807 8,202 41,009 4.92 3.46 - 0.00 0.00
8 1 9 43.65 30.67 32 0 32 126.58 88.61
Page 202 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 - 0.00
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 4 4 13,230 662 13,892 3,473 17,365 8.34 5.85
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
0 0 15,215 761 15,976 3,994 800 20,770 0.00 0.00 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.12
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
2 2 15,215 761 15,976 3,994 19,970 4.79 3.35 0 4 4 13,230 662 13,892 3,473 17,365 6.25 4.39
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 4 4 13,230 662 13,892 3,473 17,365 8.34 5.85
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
0 0 15,215 761 15,976 3,994 800 20,770 0.00 0.00 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
0 0 15,215 761 15,976 3,994 800 20,770 0.00 0.00 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.12
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 4 4 13,230 662 13,892 3,473 800 18,165 8.72 6.12
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Appro
ved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Approv
ed
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
WIC Operator at RVS/SVS (Base rationalized as per State decision)Cold Chain Technician
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 203 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Appro
ved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Approv
ed
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
WIC Operator at RVS/SVS (Base rationalized as per State decision)Cold Chain Technician
Other Staff
16.8.2.1.11
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 0 0 13,230 662 13,892 3,473 17,365 0.00 0.00
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 4 4 13,230 662 13,892 3,473 17,365 8.34 5.85
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 0 0 13,230 662 13,892 3,473 800 18,165 0.00 0.00
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 4 4 13,230 662 13,892 3,473 17,365 8.34 5.85
0 15,215 761 15,976 3,994 19,970 0.00 0.00
0 0 15,215 761 15,976 3,994 19,970 0.00 0.00 0
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00
- 0.00 0.00 8 8 13,245 662 13,907 3,477 17,384 16.69 11.72
24 0 24 58.28 40.80 36 4 40 82.44 57.90
Page 204 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 22.11 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 30.08 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 25.17 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 16.32 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 37.36 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 16.59 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 34.17 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 15.98 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 17.71 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 17.06 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 45.07 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.39 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.39 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.05 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 24.44 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 34.16 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.39 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 22.45 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.39 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 36.38 1 1 30958 1548 32506 8127 40633 4.88 3.41
Grand
Total
amount
Approv
ed
(70%)
District Leprosy Consultant
Consultants/ Programme Officers
16.8.2.2.2
Total
Total
amou
nt per
annu
m (Rs.
In
lakhs)
Total
amoun
t
Appro
ved
(70%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incent
ive
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
No. of position
Base
2017-18
Increm
ent
(5%)
Immunization Computer Assistant
District level HR under DCP
Other Staff
District level HR under RMNCH+A & HSS
16.8.2.1.11
Page 205 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Grand
Total
amount
Approv
ed
(70%)
District Leprosy Consultant
Consultants/ Programme Officers
16.8.2.2.2
Total
Total
amou
nt per
annu
m (Rs.
In
lakhs)
Total
amoun
t
Appro
ved
(70%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incent
ive
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
No. of position
Base
2017-18
Increm
ent
(5%)
Immunization Computer Assistant
Other Staff
16.8.2.1.11
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 17.06 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 41.89 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 20.26 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 19.39 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 19.79 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 20.77 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 23.46 0 0 30958 1548 32506 8127 40633 - -
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 29.74 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 800 20,770 2.49 1.74 19.79 1 1 30958 1548 32506 8127 40633 4.88 3.41
1 1 15,215 761 15,976 3,994 19,970 2.40 1.68 44.73 1 1 30958 1548 32506 8127 40633 4.88 3.41
2.72
2.72
0.00
0.00
37.13
0.00
0.00
0.00
0.00
15.18
30 0 30 72.95 51.06 806.30 22 ##### 75.09
Page 206 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 50068 6.01 4.21 4.21
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 4.42
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 4.21
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 4.42
1 1 38147 1907 40054 10014 50068 6.01 4.21 4.21
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 50068 6.01 4.21 4.21
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
Grand Total
amount Approved
(70%)
Consultants/ Programme Officers
16.8.2.2.2
District VBD Consultant
Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved (70%)
No. of position
Base 2017-18Increment
(5%)
District level HR under DCP
Page 207 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Grand Total
amount Approved
(70%)
Consultants/ Programme Officers
16.8.2.2.2
District VBD Consultant
Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved (70%)
No. of position
Base 2017-18Increment
(5%)
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 4.42
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 4.42
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
1 1 38147 1907 40054 10014 2600 52668 6.32 4.42 7.84
1 1 38147 1907 40054 10014 50068 6.01 4.21 7.62
-
-
-
-
-
-
-
-
-
-
30 0 30 183.68 128.57 203.66
Page 208 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Exis
ting
Ne
w
Tot
al
Exis
ting
Ne
w
Tot
al
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
District Programme Coordinator Cordinator PPP (Re-designated from PPM Cordinator)
Programme Coordinators (RNTCP)
16.8.2.2.4
Revised
Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
Total
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of
positionBase 2017-
18
Increment
(5%)
No. of
positionBase
2017-18
Increm
ent
(5%)
Revised
Base
PI
(Max
25%)
KBK
incent
ive
District level HR under DCP
Page 209 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Exis
ting
Ne
w
Tot
al
Exis
ting
Ne
w
Tot
al
District Programme Coordinator Cordinator PPP (Re-designated from PPM Cordinator)
Programme Coordinators (RNTCP)
16.8.2.2.4
Revised
Base
PI (Max
25%)
KBK
incentiveTotal
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
Total
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of
positionBase 2017-
18
Increment
(5%)
No. of
positionBase
2017-18
Increm
ent
(5%)
Revised
Base
PI
(Max
25%)
KBK
incent
ive
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 1600 34014 4.08 2.86 1 1 20727 1036 21763 5441 1200 28404 3.41 2.39
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
1 1 24696 1235 25931 6483 32414 3.89 2.72 1 1 20727 1036 21763 5441 27204 3.26 2.29
31 122.69 85.88 31 0 31 102.78 71.95
Page 210 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
Grand Total
amount
Approved
(70%)
District PMDT TB-HIV Coordinator
Programme Coordinators (RNTCP)
16.8.2.2.4
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
District level HR under DCP
Page 211 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Grand Total
amount
Approved
(70%)
District PMDT TB-HIV Coordinator
Programme Coordinators (RNTCP)
16.8.2.2.4
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 1200 28404 3.41 2.39 7.63
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
1 1 20727 1036 21763 5441 27204 3.26 2.29 7.29
-
-
-
-
-
-
-
-
-
31 0 31 102.78 71.95 229.78
Page 212 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 800 20770 7.48 5.23
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 800 20770 4.98 3.49
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 800 20770 7.48 5.23
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 19970 9.59 6.71
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 800 20770 9.97 6.98
1 1 22050 1103 23153 5788 28941 3.47 2.43 5 5 15215 761 15976 3994 800 20770 12.46 8.72
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 19970 9.59 6.71
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 6 6 15215 761 15976 3994 800 20770 14.95 10.47
District Data Manager (IDSP)
MIS/ IT Staff
16.8.2.2.5
Sentinel Site Malaria Technician cum Coordinator (Multiskilling)
Other Staff
16.8.2.2.11
Total
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI
(Max
25%)
KBK
incen
tive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
District level HR under DCP
Page 213 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
District Data Manager (IDSP)
MIS/ IT Staff
16.8.2.2.5
Sentinel Site Malaria Technician cum Coordinator (Multiskilling)
Other Staff
16.8.2.2.11
Total
Total
amoun
t per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Incre
ment
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Revised
Base
PI
(Max
25%)
KBK
incen
tive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 800 20770 7.48 5.23
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 19970 9.59 6.71
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 800 20770 7.48 5.23
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 800 20770 7.48 5.23
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 19970 4.79 3.35
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 800 20770 9.97 6.98
1 1 22050 1103 23153 5788 28941 3.47 2.43 3 3 15215 761 15976 3994 19970 7.19 5.03
1 1 22050 1103 23153 5788 28941 3.47 2.43 2 2 15215 761 15976 3994 800 20770 4.98 3.49
1 1 22050 1103 23153 5788 28941 3.47 2.43 4 4 15215 761 15976 3994 19970 9.59 6.71
0 22050 1103 23153 5788 28941 - -
30 0 30 104.19 72.93 90 0 90 219.32 153.53
Page 214 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
6 6 15215 761 15976 3994 19970 14.38 10.06 1 1 11025 551 11576 2894 14470 1.74 1.22
3 3 15215 761 15976 3994 19970 7.19 5.03 1 1 11025 551 11576 2894 14470 1.74 1.22
5 5 15215 761 15976 3994 19970 11.98 8.39 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
7 7 15215 761 15976 3994 800 20770 17.45 12.21 1 1 11025 551 11576 2894 14470 1.74 1.22
3 3 15215 761 15976 3994 800 20770 7.48 5.23 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
3 3 15215 761 15976 3994 19970 7.19 5.03 1 1 11025 551 11576 2894 14470 1.74 1.22
6 6 15215 761 15976 3994 19970 14.38 10.06 1 1 11025 551 11576 2894 14470 1.74 1.22
5 5 15215 761 15976 3994 800 20770 12.46 8.72 1 1 11025 551 11576 2894 14470 1.74 1.22
10 10 15215 761 15976 3994 19970 23.96 16.77 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
3 3 15215 761 15976 3994 19970 7.19 5.03 1 1 11025 551 11576 2894 14470 1.74 1.22
11 11 15215 761 15976 3994 800 20770 27.42 19.19 1 1 11025 551 11576 2894 14470 1.74 1.22
11 11 15215 761 15976 3994 800 20770 27.42 19.19 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
11 11 15215 761 15976 3994 19970 26.36 18.45 1 1 11025 551 11576 2894 14470 1.74 1.22
2 2 15215 761 15976 3994 19970 4.79 3.35 1 1 11025 551 11576 2894 14470 1.74 1.22
12 12 15215 761 15976 3994 800 20770 29.91 20.94 1 1 11025 551 11576 2894 14470 1.74 1.22
VBD Technical Supervisor (MTS) Driver (RNTCP)
Other Staff
16.8.2.2.11
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of positionBase
2017-
18
Incre
ment
(5%)
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increment
(5%)
District level HR under DCP
Page 215 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
VBD Technical Supervisor (MTS) Driver (RNTCP)
Other Staff
16.8.2.2.11
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of positionBase
2017-
18
Incre
ment
(5%)
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Revised
Base
PI (Max
25%)
KBK
incent
ive
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increment
(5%)
7 7 15215 761 15976 3994 800 20770 17.45 12.21 1 1 11025 551 11576 2894 14470 1.74 1.22
15 15 15215 761 15976 3994 19970 35.95 25.16 1 1 11025 551 11576 2894 14470 1.74 1.22
7 7 15215 761 15976 3994 800 20770 17.45 12.21 1 1 11025 551 11576 2894 14470 1.74 1.22
4 4 15215 761 15976 3994 19970 9.59 6.71 1 1 11025 551 11576 2894 14470 1.74 1.22
4 4 15215 761 15976 3994 800 20770 9.97 6.98 1 1 11025 551 11576 2894 14470 1.74 1.22
1 1 15215 761 15976 3994 19970 2.40 1.68 1 1 11025 551 11576 2894 14470 1.74 1.22
10 10 15215 761 15976 3994 800 20770 24.92 17.45 1 1 11025 551 11576 2894 14470 1.74 1.22
6 6 15215 761 15976 3994 19970 14.38 10.06 1 1 11025 551 11576 2894 14470 1.74 1.22
4 4 15215 761 15976 3994 800 20770 9.97 6.98 1 1 11025 551 11576 2894 14470 1.74 1.22
14 14 15215 761 15976 3994 19970 33.55 23.48 1 1 11025 551 11576 2894 14470 1.74 1.22
1 1 11025 551 11576 2894 14470 1.74 1.22
180 0 180 439.13 307.39 31 0 31 53.83 37.68
Page 216 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
0 0 20727 1036 21763 5441 27204 - - 16.31
0 0 20727 1036 21763 5441 27204 - - 9.60
0 0 20727 1036 21763 5441 27204 - - 14.64
0 0 20727 1036 21763 5441 27204 - - 7.93
0 0 20727 1036 21763 5441 27204 - - 18.66
0 0 20727 1036 21763 5441 27204 - - 9.94
1 1 20727 1036 21763 5441 27204 3.26 2.29 11.89
0 0 20727 1036 21763 5441 27204 - - 9.60
0 0 20727 1036 21763 5441 27204 - - 16.31
0 0 20727 1036 21763 5441 27204 - - 15.17
1 1 20727 1036 21763 5441 27204 3.26 2.29 26.99
0 0 20727 1036 21763 5441 27204 - - 7.93
0 0 20727 1036 21763 5441 27204 - - 7.93
0 0 20727 1036 21763 5441 27204 - - 9.60
0 0 20727 1036 21763 5441 27204 - - 27.39
0 0 20727 1036 21763 5441 27204 - - 29.13
0 0 20727 1036 21763 5441 27204 - - 7.93
0 0 20727 1036 21763 5441 27204 - - 26.38
0 0 20727 1036 21763 5441 27204 - - 9.60
1 1 20727 1036 21763 5441 27204 3.26 2.29 34.90
Grand Total
amount
Approved
(70%)
SA- DRTB Centre
Other Staff
16.8.2.2.11
Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)
District level HR under DCP
Page 217 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Grand Total
amount
Approved
(70%)
SA- DRTB Centre
Other Staff
16.8.2.2.11
Revised Base PI (Max 25%) KBK incentive Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
No. of position
Base 2017-18Increment
(5%)
0 0 20727 1036 21763 5441 27204 - - 18.66
0 0 20727 1036 21763 5441 27204 - - 33.09
0 0 20727 1036 21763 5441 27204 - - 18.66
0 0 20727 1036 21763 5441 27204 - - 11.28
0 0 20727 1036 21763 5441 27204 - - 13.43
0 0 20727 1036 21763 5441 27204 - - 6.25
0 0 20727 1036 21763 5441 27204 - - 25.64
1 1 20727 1036 21763 5441 27204 3.26 2.29 18.60
0 0 20727 1036 21763 5441 27204 - - 11.68
0 0 20727 1036 21763 5441 27204 - - 31.41
0 0 20727 1036 21763 5441 27204 - - 1.22
-
-
-
-
-
-
-
-
-
4 0 4 13.06 9.14 507.74
Page 218 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
Grand
Total
amount
Approv
ed
(70%)
District Consultant NTCP Finance cum logistics consultant (NPCDCS)
Consultants/ Programme Officers
16.8.2.3.2
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Appro
ved
(70%)
Total
Total
amou
nt per
annu
m (Rs.
In
lakhs)
Total
amoun
t
Approv
ed
(70%)
No. of positionBase
2017-
18
Increm
ent
(5%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
District level HR under NCD
Page 219 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Grand
Total
amount
Approv
ed
(70%)
District Consultant NTCP Finance cum logistics consultant (NPCDCS)
Consultants/ Programme Officers
16.8.2.3.2
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amoun
t
Appro
ved
(70%)
Total
Total
amou
nt per
annu
m (Rs.
In
lakhs)
Total
amoun
t
Approv
ed
(70%)
No. of positionBase
2017-
18
Increm
ent
(5%)
No. of position
Base
2017-18
Increme
nt (5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
1 1 31201 1560 32761 8190 1800 42751 5.13 3.59 1 1 31,973 1,599 33,572 8393 1800 43765 5.25 3.68 7.27
1 1 31201 1560 32761 8190 40951 4.91 3.44 1 1 31,973 1,599 33,572 8393 41965 5.04 3.53 6.96
0 - - -
-
-
-
-
-
-
-
-
-
30 0 30 936030 46800 ##### 104.86 30 0 30 153.45 107.42 212.27
Page 220 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Exist
ingNew Total
Exist
ingNew Total
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
1 1 24035 1202 25237 6309 1600 33146 3.98 2.78 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
1 1 24035 1202 25237 6309 1600 33146 3.98 2.78 0 - -
Revised
Base
PI (Max
25%)
KBK
incentiv
e
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total amount
Approved
(70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
District Programme Coordinator (NPCDCS)
Programme Coordinators
16.8.2.3.4
Data entry operator CHC level (NPCDCS)
Data Entry Operation
16.8.2.3.9
Base
2017-
18
Increm
ent
(5%)
No. of positionBase
2017-
18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incentiv
e
District level HR under NCD
Page 221 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Exist
ingNew Total
Exist
ingNew Total
Revised
Base
PI (Max
25%)
KBK
incentiv
e
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total amount
Approved
(70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
District Programme Coordinator (NPCDCS)
Programme Coordinators
16.8.2.3.4
Data entry operator CHC level (NPCDCS)
Data Entry Operation
16.8.2.3.9
Base
2017-
18
Increm
ent
(5%)
No. of positionBase
2017-
18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incentiv
e
- - 0 - -
- - 0 - -
1 1 24035 1202 25237 6309 1600 33146 3.98 2.78 8 8 13,230 662 13,892 3,473 800 18165 17.44 12.21
- - 0 - -
1 1 24035 1202 25237 6309 1600 33146 3.98 2.78 2 2 13,230 662 13,892 3,473 800 18165 4.36 3.05
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
- - 0 - -
0 - -
4 0 4 15.91 11.14 10 0 10 21.80 15.26
Page 222 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
8 8 20,837 1042 21879 5470 27349 26.26 18.38 8 8 13,230 662 13892 3473 17365 16.67 11.67
12 12 20,837 1042 21879 5470 27349 39.38 27.57 12 12 13,230 662 13892 3473 17365 25.01 17.50
12 12 20,837 1042 21879 5470 27349 39.38 27.57 12 12 13,230 662 13892 3473 17365 25.01 17.50
7 7 20,837 1042 21879 5470 27349 22.97 16.08 7 7 13,230 662 13892 3473 17365 14.59 10.21
14 14 20,837 1042 21879 5470 1200 28549 47.96 33.57 14 14 13,230 662 13892 3473 800 18165 30.52 21.36
3 3 20,837 1042 21879 5470 1200 28549 10.28 7.19 3 3 13,230 662 13892 3473 800 18165 6.54 4.58
14 14 20,837 1042 21879 5470 27349 45.95 32.16 14 14 13,230 662 13892 3473 17365 29.17 20.42
3 3 20,837 1042 21879 5470 27349 9.85 6.89 3 3 13,230 662 13892 3473 17365 6.25 4.38
8 8 20,837 1042 21879 5470 27349 26.26 18.38 8 8 13,230 662 13892 3473 17365 16.67 11.67
7 7 20,837 1042 21879 5470 1200 28549 23.98 16.79 7 7 13,230 662 13892 3473 800 18165 15.26 10.68
22 22 20,837 1042 21879 5470 27349 72.20 50.54 22 22 13,230 662 13892 3473 17365 45.84 32.09
8 8 20,837 1042 21879 5470 27349 26.26 18.38 8 8 13,230 662 13892 3473 17365 16.67 11.67
10 10 20,837 1042 21879 5470 27349 32.82 22.97 10 10 13,230 662 13892 3473 17365 20.84 14.59
5 5 20,837 1042 21879 5470 27349 16.41 11.49 5 5 13,230 662 13892 3473 17365 10.42 7.29
13 13 20,837 1042 21879 5470 1200 28549 44.54 31.18 13 13 13,230 662 13892 3473 800 18165 28.34 19.84
12 12 20,837 1042 21879 5470 1200 28549 41.11 28.78 12 12 13,230 662 13892 3473 800 18165 26.16 18.31
9 9 20,837 1042 21879 5470 27349 29.54 20.68 9 9 13,230 662 13892 3473 17365 18.75 13.13
13 13 20,837 1042 21879 5470 27349 42.66 29.87 13 13 13,230 662 13892 3473 17365 27.09 18.96
10 10 20,837 1042 21879 5470 27349 32.82 22.97 10 10 13,230 662 13892 3473 17365 20.84 14.59
14 14 20,837 1042 21879 5470 1200 28549 47.96 33.57 14 14 13,230 662 13892 3473 800 18165 30.52 21.36
Block Programme Manager
Programme Manager
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
16.8.3.1.1
Block Data Manager
MIS/ Staff
16.8.3.1.5
Block level HR under RMNCH+A & HSS
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
Page 223 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
Block Programme Manager
Programme Manager
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
16.8.3.1.1
Block Data Manager
MIS/ Staff
16.8.3.1.5
Revised
Base
PI
(Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approve
d (70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
No. of position
Base
2017-18
Increm
ent
(5%)
7 7 20,837 1042 21879 5470 1200 28549 23.98 16.79 7 7 13,230 662 13892 3473 800 18165 15.26 10.68
26 26 20,837 1042 21879 5470 27349 85.33 59.73 26 26 13,230 662 13892 3473 17365 54.18 37.93
10 10 20,837 1042 21879 5470 1200 28549 34.26 23.98 10 10 13,230 662 13892 3473 800 18165 21.80 15.26
8 8 20,837 1042 21879 5470 27349 26.26 18.38 8 8 13,230 662 13892 3473 17365 16.67 11.67
5 5 20,837 1042 21879 5470 1200 28549 17.13 11.99 5 5 13,230 662 13892 3473 800 18165 10.90 7.63
11 11 20,837 1042 21879 5470 27349 36.10 25.27 11 11 13,230 662 13892 3473 17365 22.92 16.05
11 11 20,837 1042 21879 5470 1200 28549 37.68 26.38 11 11 13,230 662 13892 3473 800 18165 23.98 16.78
9 9 20,837 1042 21879 5470 27349 29.54 20.68 9 9 13,230 662 13892 3473 17365 18.75 13.13
6 6 20,837 1042 21879 5470 1200 28549 20.56 14.39 6 6 13,230 662 13892 3473 800 18165 13.08 9.16
17 17 20,837 1042 21879 5470 27349 55.79 39.05 17 17 13,230 662 13892 3473 17365 35.42 24.80
314 0 314 1045.20 731.64 314 0 314 664.11 464.87
Page 224 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existi
ngNew Total
Existi
ngNew Total
8 8 15,215 761 15976 3994 19970 19.17 13.42 8 8 17420 871 18291 4573 22864 21.95 15.36
12 12 15,215 761 15976 3994 19970 28.76 20.13 12 12 17420 871 18291 4573 22864 32.92 23.05
12 12 15,215 761 15976 3994 19970 28.76 20.13 12 12 17420 871 18291 4573 22864 32.92 23.05
7 7 15,215 761 15976 3994 19970 16.77 11.74 7 7 17420 871 18291 4573 22864 19.21 13.44
14 14 15,215 761 15976 3994 1000 20970 35.23 24.66 14 14 17420 871 18291 4573 1000 23864 40.09 28.06
3 3 15,215 761 15976 3994 1000 20970 7.55 5.28 3 3 17420 871 18291 4573 1000 23864 8.59 6.01
14 14 15,215 761 15976 3994 19970 33.55 23.48 15 15 17420 871 18291 4573 22864 41.16 28.81
3 3 15,215 761 15976 3994 19970 7.19 5.03 3 3 17420 871 18291 4573 22864 8.23 5.76
8 8 15,215 761 15976 3994 19970 19.17 13.42 8 8 17420 871 18291 4573 22864 21.95 15.36
7 7 15,215 761 15976 3994 1000 20970 17.61 12.33 7 7 17420 871 18291 4573 1000 23864 20.05 14.03
22 22 15,215 761 15976 3994 19970 52.72 36.90 22 22 17420 871 18291 4573 22864 60.36 42.25
8 8 15,215 761 15976 3994 19970 19.17 13.42 8 8 17420 871 18291 4573 22864 21.95 15.36
10 10 15,215 761 15976 3994 19970 23.96 16.77 10 10 17420 871 18291 4573 22864 27.44 19.21
5 5 15,215 761 15976 3994 19970 11.98 8.39 5 5 17420 871 18291 4573 22864 13.72 9.60
13 13 15,215 761 15976 3994 1000 20970 32.71 22.90 13 13 17420 871 18291 4573 1000 23864 37.23 26.06
12 12 15,215 761 15976 3994 1000 20970 30.20 21.14 12 12 17420 871 18291 4573 1000 23864 34.36 24.05
9 9 15,215 761 15976 3994 19970 21.57 15.10 9 9 17420 871 18291 4573 22864 24.69 17.29
13 13 15,215 761 15976 3994 19970 31.15 21.81 13 13 17420 871 18291 4573 22864 35.67 24.97
10 10 15,215 761 15976 3994 19970 23.96 16.77 9 9 17420 871 18291 4573 22864 24.69 17.29
14 14 15,215 761 15976 3994 1000 20970 35.23 24.66 14 14 17420 871 18291 4573 1000 23864 40.09 28.06
Block level HR under DCPBlock level HR under RMNCH+A & HSS
16.8.3.1.7
Accounts Staff
Block Accounts Manager
Other Staff
16.8.3.2.11
STS (RNTCP)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increm
ent
(5%)
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Page 225 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existi
ngNew Total
Existi
ngNew Total
16.8.3.1.7
Accounts Staff
Block Accounts Manager
Other Staff
16.8.3.2.11
STS (RNTCP)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approved
(70%)
Total
Total
amount
per
annum
(Rs. In
lakhs)
Total
amount
Approv
ed
(70%)
No. of position
Base 2017-
18
Increm
ent
(5%)
No. of position
Base
2017-18
Increm
ent
(5%)
Revised
Base
PI (Max
25%)
KBK
incenti
ve
7 7 15,215 761 15976 3994 1000 20970 17.61 12.33 7 7 17420 871 18291 4573 1000 23864 20.05 14.03
26 26 15,215 761 15976 3994 19970 62.31 43.61 26 26 17420 871 18291 4573 22864 71.34 49.93
10 10 15,215 761 15976 3994 1000 20970 25.16 17.61 10 10 17420 871 18291 4573 1000 23864 28.64 20.05
8 8 15,215 761 15976 3994 19970 19.17 13.42 8 8 17420 871 18291 4573 22864 21.95 15.36
5 5 15,215 761 15976 3994 1000 20970 12.58 8.81 5 5 17420 871 18291 4573 1000 23864 14.32 10.02
11 11 15,215 761 15976 3994 19970 26.36 18.45 11 11 17420 871 18291 4573 22864 30.18 21.13
11 11 15,215 761 15976 3994 1000 20970 27.68 19.38 11 11 17420 871 18291 4573 1000 23864 31.50 22.05
9 9 15,215 761 15976 3994 19970 21.57 15.10 9 9 17420 871 18291 4573 22864 24.69 17.29
6 6 15,215 761 15976 3994 1000 20970 15.10 10.57 6 6 17420 871 18291 4573 1000 23864 17.18 12.03
17 17 15,215 761 15976 3994 19970 40.74 28.52 18 18 17420 871 18291 4573 22864 49.39 34.57
3 3 17420 871 18291 4573 22864 8.23 5.76
314 0 314 764.71 535.30 318 0 318 884.73 619.31
Page 226 of 280
16.8 Programme Management (HR)
1 Angul
2 Balasore
3 Baragarh
4 Bhadrak
5 Bolangir
6 Boudh
7 Cuttack
8 Deogarh
9 Dhenkanal
10 Gajapati
11 Ganjam
12 Jagatsinghpur
13 Jajpur
14 Jharsuguda
15 Kalahandi
16 Kandhamal
17 Kendrapara
18 Keonjhar
19 Khurda
20 Koraput
DistrictSl.
No.
Existing New Total
3 3 17420 871 18291 4573 22864 8.23 5.76 21.13
5 5 17420 871 18291 4573 22864 13.72 9.60 32.65
3 3 17420 871 18291 4573 22864 8.23 5.76 28.81
3 3 17420 871 18291 4573 22864 8.23 5.76 19.21
4 4 17420 871 18291 4573 1000 23864 11.45 8.02 36.08
1 1 17420 871 18291 4573 1000 23864 2.86 2.00 8.02
5 5 17420 871 18291 4573 22864 13.72 9.60 38.41
1 1 17420 871 18291 4573 22864 2.74 1.92 7.68
3 3 17420 871 18291 4573 22864 8.23 5.76 21.13
2 2 17420 871 18291 4573 1000 23864 5.73 4.01 18.04
7 7 17420 871 18291 4573 22864 19.21 13.44 55.70
2 2 17420 871 18291 4573 22864 5.49 3.84 19.21
4 4 17420 871 18291 4573 22864 10.97 7.68 26.89
2 2 17420 871 18291 4573 22864 5.49 3.84 13.44
4 4 17420 871 18291 4573 1000 23864 11.45 8.02 34.08
3 3 17420 871 18291 4573 1000 23864 8.59 6.01 30.07
3 3 17420 871 18291 4573 22864 8.23 5.76 23.05
5 5 17420 871 18291 4573 22864 13.72 9.60 34.57
3 3 17420 871 18291 4573 22864 8.23 5.76 23.05
5 5 17420 871 18291 4573 1000 23864 14.32 10.02 38.09
Block level HR under DCP
Grand Total
amount
Approved
(70%)
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
STLS (RNTCP)
Other Staff
16.8.3.2.11
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
Page 227 of 280
16.8 Programme Management (HR)
DistrictSl.
No.
21 Malkanagiri
22 Mayurbhanj
23 Nawarangpur
24 Nayagarh
25 Nuapada
26 Puri
27 Rayagada
28 Sambalpur
29 Sonepur
30 Sundargarh
31 Cap Hosp
32 RGH
33 SCB
34 MKCG
35 VSS
36 SVPPGIP
37 PRMMCH MBJ
38 SLNMCH KPT
39 AHRCC Cuttack
40 State
Total
Existing New Total
Grand Total
amount
Approved
(70%)
Total
Total amount
per annum
(Rs. In lakhs)
Total amount
Approved
(70%)
STLS (RNTCP)
Other Staff
16.8.3.2.11
No. of position
Base 2017-18Increment
(5%)Revised Base PI (Max 25%) KBK incentive
3 3 17420 871 18291 4573 1000 23864 8.59 6.01 20.05
9 9 17420 871 18291 4573 22864 24.69 17.29 67.22
3 3 17420 871 18291 4573 1000 23864 8.59 6.01 26.06
3 3 17420 871 18291 4573 22864 8.23 5.76 21.13
2 2 17420 871 18291 4573 1000 23864 5.73 4.01 14.03
4 4 17420 871 18291 4573 22864 10.97 7.68 28.81
3 3 17420 871 18291 4573 1000 23864 8.59 6.01 28.06
3 3 17420 871 18291 4573 22864 8.23 5.76 23.05
2 2 17420 871 18291 4573 1000 23864 5.73 4.01 16.04
7 7 17420 871 18291 4573 22864 19.21 13.44 48.01
2 2 17420 871 18291 4573 22864 5.49 3.84 9.60
-
-
-
-
-
-
-
-
-
109 0 109 302.90 212.03 831.34
Page 228 of 280
9.2.2.HR Nursing _ SIHFW
Exisiting New Total
Consultant (cat-1) 3 3 55,456 2,773 58,229 14,557 72,786 26.20 18.34
Consultant (cat-2) (Base rationalized as per State's decision) 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
4 23.69
Training Consultant (Base rationalized as per State's decision) 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
Program Assistant (Base rationalized as per State's decision) 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
3 13.42
Training Coordinator 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
Asst. Manager Procurement & Logistic 1 1 29,794 1,490 31,284 7,821 39,105 4.69 3.28
Program Assistant (Base rationalized as per State's decision) 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
Support Staff (Base rationalized as per State's decision) 1 1 10,082 504 10,586 2,647 13,233 1.59 1.11
Consultant Paediatric (Tech) 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
Consultant O&G (Tech) 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
Program Assistant (Base rationalized as per State's decision) 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
Program Assistant (Base rationalized as per State's decision) 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
Bio-statistician 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
Program Assistant (Base rationalized as per State's decision) 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
Finance Manager 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
Accountant-cum-DEO (Base rationalized as per State's decision) 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
13 47.22
20 84.33
Huma Resoures under Nursing Cell & SIHFW
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Revised Base PI (Max 25%)
Documentation, Monitoring, Evaluation & Research Unit
Finance Division of SIHFW
Total
Total
amount per
annum (Rs.
In lakhs)
Total
amount
Approved
(70%) Nursing Cell (Directorate of Nursing)
Total of 9.2.2
A.9.1.1.2 9.2.2
SNC at College of Nursing
A.9.1.1.3 9.2.2
Sub-total of SNC at College of Nursing
SIHFW
Sub-total of Nursing Cell
Sub-total of SIH&FW
A.9.1.1.1 9.2.2
Material Development & Printing Unit
Planning & Implementation unit
Quality Assurance Unit
Page 229 of 280
16.8.1.1.State.HR_On Deputation
Exisiting New Total
Mission Director (On deputation) 1 1 1,41,750 7,088 1,48,838 37,210 1,86,048 22.33 15.63
Jt. Director (Administration) (On deputation) 1 1 78,750 3,938 82,688 20,672 1,03,360 12.40 8.68
HRD Manager (On deputation) 1 1 78,750 3,938 82,688 20,672 1,03,360 12.40 8.68
Addl. Director (Fin) (On deputation) 1 1 1,26,000 6,300 1,32,300 33,075 1,65,375 19.85 13.89
Jt. Director (Technical) (On deputation) 1 1 99,750 4,988 1,04,738 26,185 1,30,923 15.71 11.00
Superintending Engineer (On deputation) 1 1 99,750 4,988 1,04,738 26,185 1,30,923 15.71 11.00
Executive Engineer (On deputation) 1 1 78,750 3,938 82,688 20,672 1,03,360 12.40 8.68
7 0 7 110.80 77.56
Salaries for Staff on Deputation
Sub-total of 16.8.1.1
A.10.1.10 16.8.1.1
Revised
Base
PI (Max
25%) Total
Total amount
per annum (Rs.
In lakhs)
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Page 230 of 280
16.8.1.2.State.HR_SHSRC
Exisiting New Total
Team Leader 1 1 99,997 5,000 1,04,997 15,750 1,20,747 14.49 10.14
Sr. Consultant, Public Health Planning 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, Community Process 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, M&E 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, Procurement & Inventory Management 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, Training Coordinator 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, Quality Imrpovement/ Quality Assurance 1 1 86,657 4,333 90,990 13,649 1,04,639 12.56 8.79
Sr. Consultant, PPP 1 1 71,663 3,583 75,246 11,287 86,533 10.38 7.27
Sr. Consultant, HR Management 1 1 71,663 3,583 75,246 11,287 86,533 10.38 7.27
9 0 9 110.60 77.42
Human Resources for SHSRC
B.21.1 16.8.1.2
Sub-total of 16.8.1.2
Revised
Base
PI (Max
15%) Total
Total amount
per annum (Rs.
In lakhs)
Total
amount
Approved
Old FMR New FMR DesignationNo. of staff
Bas
e
20
17
-18
Increment
(5%)
Page 231 of 280
16.8.1.3.State.HR_RMNCH+A & HSS
Exisiting New Total
A.10.1.1 16.8.1.3.1 State Programme Manager Programme Unit 1 1 79,380 3,969 83,349 20,837 1,04,186 12.50 8.75
16.8.1.3.1 Senior Project Officer (Proposed for 3 months) e-VIN 1 1 1,00,000 3.00 3.00
A.10.1.5 16.8.1.3.1Counsultant Quality Improvement & Quality
Assurance (Mgt.)QA 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Conslutant RMNCHA (Mgt) QA 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 State Communication Manager IEC/ BCC (CoE) 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) HR 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) Health Plan 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) MH 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) CH 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) Training 2 2 55,456 2,773 58,229 14,557 72,786 17.47 12.23
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) PPP/ NGO 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) IEC/ BCC (CoE) 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) RBSK 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-I) RSBY 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) HR 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) Programme Unit 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) Tribal Health 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) RKSK 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) Training 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) PPP/ NGO 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) RBSK 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) BMW cell 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) Blood Cell 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Mgt. Consultant (Cat-II) AYUSH cell 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
A.10.1.5 16.8.1.3.1Consultant CPS (Approved in 2nd supplementary
PIP 2017-18)CPS 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Equity & Advocacy Manager Equity & Advocacy Cell 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 State Facilitator, PNDT Equity & Advocacy Cell 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.5 16.8.1.3.1 Legal Advisor Equity & Advocacy Cell 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
B1.1.5.1 16.8.1.3.1 Consultant Community Process CPRC 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
B1.1.5.1 16.8.1.3.1 Consultant GKS CPRC 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.3 16.8.1.3.1 Logistic ManagerAdmin. & Off.
Establishment1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
16.8.1.3.1 Conslutant FPLMIS FP 1 1 50,936 12,734 63,670 5.73 4.01
A.10.1.5 16.8.1.3.1 Project Manager - 108 (Consultant OEMAS - Mgt)Paitent Transp. Cell
(NAS)1 1 41,454 2,073 43,527 10,882 54,409 6.53 4.57
A.10.1.5 16.8.1.3.1 Project Manager - 102 (Consultant OEMAS - Mgt)Paitent Transp. Cell
(NAS)1 1 41,454 2,073 43,527 10,882 54,409 6.53 4.57
37 2 39 308.29 216.70
Remuneration for State level HR under RMNCH+A & HSS
Remarks Revised
Base
PI (Max
25%) Total
Total
amount per
annum (Rs.
In lakhs)
Sub-total of 16.8.1.3.1
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Wing
Page 232 of 280
16.8.1.3.State.HR_RMNCH+A & HSS
Exisiting New Total Remarks
Revised
Base
PI (Max
25%) Total
Total
amount per
annum (Rs.
In lakhs)
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Wing
A.10.1.5 16.8.1.3.2 Team Leader (tech)Paitent Transp. Cell
(NAS)1 1 58,674 2,934 61,608 15,402 77,010 9.24 6.47
A.10.1.5 16.8.1.3.2 Sr. Maternal Health Manager (Tech) MH 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2 Consultant Child Health (Tech) CH 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2
Consultant Family Planning (Tech)
(Position dropped & in place of which
Conslutant FPLMIS proposed- Cat-II)
FP 0 - - - - - -
A.10.1.5 16.8.1.3.2 Consultant New Born Care (Tech) CH 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2 State Child Health Manager CH 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2Counsultant Quality Improvement & Quality
Assurance (Tech)QA 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2 Conslutant RMNCHA (Tech) QA 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
A.10.1.5 16.8.1.3.2 Conslutant RKSK (Tech) RKSK 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
8 0 8 70.99 49.69
B5.4.1 16.8.1.3.3 Consultant Works Engineering 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
B5.4.1 16.8.1.3.3 Architect Engineering 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
B5.4.1 16.8.1.3.3 Assistant Engineer Engineering 3 3 48,510 2,426 50,936 12,734 63,670 22.92 16.04
B5.4.1 16.8.1.3.3 Asst. Engineer, Electrical Engineering 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
B5.4.1 16.8.1.3.3 Junior Engineer Engineering 3 3 27,783 1,389 29,172 7,293 36,465 13.13 9.19
B5.4.1 16.8.1.3.3 Junior Engineer (Auto CAD) Engineering 1 1 27,783 1,389 29,172 7,293 36,465 4.38 3.06
B5.4.1 16.8.1.3.3 Junior Engineer, Electrical Engineering 1 1 27,783 1,389 29,172 7,293 36,465 4.38 3.06
11 0 11 68.82 48.17
A.10.1.6 16.8.1.3.4 State Programme Assistant HR 3 3 24,696 1,235 25,931 6,483 32,414 11.67 8.17
A.10.1.6 16.8.1.3.4 State Programme Assistant Health Plan 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant MH 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
A.10.1.6 16.8.1.3.4 State Programme Assistant CH 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
A.10.1.6 16.8.1.3.4 State Programme Assistant Tribal Health 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant RKSK 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant M&E 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
A.10.1.6 16.8.1.3.4 State Programme Assistant PPP/ NGO 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant Equity & Advocacy Cell 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant IEC/ BCC (CoE) 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
A.10.1.6 16.8.1.3.4 State Programme Assistant RBSK 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme AssistantPaitent Transp. Cell
(NAS)1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant QA 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant BMW cell 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant AYUSH cell 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.6 16.8.1.3.4 State Programme Assistant (GIS)GIS & Resource
Mapping1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
B1.1.5.1 16.8.1.3.4 State Programme Assistant CPRC 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
B5.4.1 16.8.1.3.4 State Programme Assistant Engineering 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
24 0 24 93.35 65.35
Sub-total of 16.8.1.3.2
Sub-total of 16.8.1.3.3
Sub-total of 16.8.1.3.4
Page 233 of 280
16.8.1.3.State.HR_RMNCH+A & HSS
Exisiting New Total Remarks
Revised
Base
PI (Max
25%) Total
Total
amount per
annum (Rs.
In lakhs)
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Wing
A.10.1.5 16.8.1.3.5 Programme Associate HR 3 3 31,201 1,560 32,761 8,190 40,951 14.74 10.32
A.10.1.5 16.8.1.3.5 Programme Associate Programme Unit 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Programme Associate Health Plan 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Programme Associate Training 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Programme Associate PPP/ NGO 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Programme Associate RSBY 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Programme Associate Blood Cell 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Coordinator Documentation, Training & Research IEC/ BCC (CoE) 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Coordinator IEC/ BCC (CoE) 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Coordinator Training 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.5 16.8.1.3.5 Message Developer IEC/ BCC (CoE) 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.11.3 16.8.1.3.5 Asst. Manager Procurement & Logistic Admin. & Off.
Establishment1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
B1.1.5.1 16.8.1.3.5 Coordinator Community Process CPRC 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
B1.1.5.1 16.8.1.3.5 Training Coordinator CPRC 5 5 31,201 1,560 32,761 8,190 40,951 24.57 17.20
20 0 20 98.28 68.80
A.10.1.5 16.8.1.3.6 Mgt. Consultant (Cat-I) M&E 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.5 16.8.1.3.6 Mgt. Consultant (Cat-I) IT 2 2 55,456 2,773 58,229 14,557 72,786 17.47 12.23
A.10.1.4 16.8.1.3.6 State Data Manager M&E 6 6 48,510 2,426 50,936 12,734 63,670 45.84 32.09
A.10.1.5 16.8.1.3.6 Mgt. Consultant (Cat-II)GIS & Resource
Mapping1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.4 16.8.1.3.6 Consultant IT (Jr.)Paitent Transp. Cell
(NAS)1 1 41,454 2,073 43,527 10,882 54,409 6.53 4.57
11 0 11 86.21 60.35
A.10.1.3 16.8.1.3.8 State Finance Manager Finance 1 1 71,663 3,583 75,246 18,812 94,058 11.29 7.90
A.10.1.2 16.8.1.3.8 State Accounts Manager Finance 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.11.1 16.8.1.3.8 Financial Analyst Finance 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.11.1 16.8.1.3.8 Audit Superintendent Audit Cell 1 1 55,456 2,773 58,229 14,557 72,786 8.73 6.11
A.10.1.11.1 16.8.1.3.8 Accounts Executive Finance 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.1 16.8.1.3.8 Accounts Manager Finance 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.1 16.8.1.3.8 Budget Officer Finance 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.1 16.8.1.3.8 Auditor Audit Cell 2 2 48,510 2,426 50,936 12,734 63,670 15.28 10.70
A.10.1.11.1 16.8.1.3.8 Consultant PFMS (Cat-II) Finance 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.1 16.8.1.3.8 Accounts Manager (Audit) Audit Cell 1 1 41,675 2,084 43,759 10,940 54,699 6.56 4.59
A.10.1.11.1 16.8.1.3.8 Accounts Officer (Jr.)Paitent Transp. Cell
(NAS)1 1 41,454 2,073 43,527 10,882 54,409 6.53 4.57
A.10.1.11.1 16.8.1.3.8 FMIO Finance 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.11.1 16.8.1.3.8 Programme Associate (PFMS) Finance 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
A.10.1.7 16.8.1.3.8 Accountant-cum-DEOAdmin. & Off.
Establishment1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.7 16.8.1.3.8 Accountant-cum-DEO HR 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.7 16.8.1.3.8 Accountant-cum-DEO Finance 3 3 24,696 1,235 25,931 6,483 32,414 11.67 8.17
A.10.1.7 16.8.1.3.8 Accountant-cum-DEO Audit Cell 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
20 0 20 129.59 90.71
Sub-total of 16.8.1.3.5
Sub-total of 16.8.1.3.6
Sub-total of 16.8.1.3.8
Page 234 of 280
16.8.1.3.State.HR_RMNCH+A & HSS
Exisiting New Total Remarks
Revised
Base
PI (Max
25%) Total
Total
amount per
annum (Rs.
In lakhs)
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Wing
A.10.1.5 16.8.1.3.9 Administrative Associate (PA to MD)Admin. & Off.
Establishment1 1 30,608 1,530 32,138 8,035 40,173 4.82 3.37
A.10.1.5 16.8.1.3.9 Sr. Steno Admin. & Off.
Establishment1 1 27,783 1,389 29,172 7,293 36,465 4.38 3.06
A.10.1.5 16.8.1.3.9 Liasioning Officer Admin. & Off.
Establishment1 1 27,783 1,389 29,172 7,293 36,465 4.38 3.06
A.10.1.11.5 16.8.1.3.9 StenoAdmin. & Off.
Establishment3 3 17,309 865 18,174 4,544 22,718 8.18 5.72
A.10.1.11.5 16.8.1.3.9 Steno Finance 1 1 17,309 865 18,174 4,544 22,718 2.73 1.91
B5.4.1 16.8.1.3.9 Stenographer Engineering 1 1 17,309 865 18,174 4,544 22,718 2.73 1.91
A.10.1.11.5 16.8.1.3.9 Sr. Administrative Asst. (Jr. PA) Training 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
B5.4.1 16.8.1.3.9 Sr. Administrative Asst. (Jr. OA) Engineering 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
A.10.1.11.5 16.8.1.3.9Front Office Executive (Base rationalized as per
State's decision)
Admin. & Off.
Establishment1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.11.5 16.8.1.3.9 Diarist (Base rationalized as per State's decision)Admin. & Off.
Establishment1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
12 0 12 36.16 25.31
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)
Admin. & Off.
Establishment4 4 13,230 662 13,892 3,473 17,365 8.34 5.83
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)HR 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)Training 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)PPP/ NGO 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)IEC/ BCC (CoE) 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)IT 2 2 13,230 662 13,892 3,473 17,365 4.17 2.92
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)Disease Control Cell 2 2 13,230 662 13,892 3,473 17,365 4.17 2.92
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)Audit Cell 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.8 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)QA 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
B1.1.5.1 16.8.1.3.10Data Entry Operator (Base rationalized as per
State's decision)CPRC 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
15 0 15 31.26 21.88
A.10.1.9 16.8.1.3.11Support Staff (Base rationalized as per State's
decision)
Admin. & Off.
Establishment12 12 10,082 504 10,586 2,647 13,233 19.06 13.34
A.10.1.9 16.8.1.3.11Support Staff (Base rationalized as per State's
decision)Immunisation 2 2 10,082 504 10,586 2,647 13,233 3.18 2.22
A.10.1.9 16.8.1.3.11Sweeper (Base rationalized as per State's
decision)
Admin. & Off.
Establishment5 5 10,082 504 10,586 2,647 13,233 7.94 5.56
19 0 19 30.17 21.12
16.8.1.3.1 Mgt. Consultant (Cat-I) IT (EVIN) Immunisation 1 1 58,229 14,557 72,786 6.55 4.59
Sub-total of 16.8.1.3.9
Sub-total of 16.8.1.3.10
Sub-total of 16.8.1.3.11
Page 235 of 280
16.8.1.3.State.HR_RMNCH+A & HSS
Exisiting New Total Remarks
Revised
Base
PI (Max
25%) Total
Total
amount per
annum (Rs.
In lakhs)
Total
amount
Approved
(70%)
Old FMR New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%) Wing
A.10.1.11.2 16.8.1.3.12 State Cold Chain Manager Immunisation 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.3 16.8.1.3.12 State Vaccine Logistic Manager Immunisation 1 1 48,510 2,426 50,936 12,734 63,670 7.64 5.35
A.10.1.11.3 16.8.1.3.12 State Vaccine Store Keeper Immunisation 1 1 24,696 1,235 25,931 6,483 32,414 3.89 2.72
A.10.1.11.2 16.8.1.3.12 Foreman Immunisation 1 1 20,837 1,042 21,879 5,470 27,349 3.28 2.30
C.2.1 16.8.1.3.12 Immunisation Computer Assistant Immunisation 1 1 20,066 1,003 21,069 5,267 26,336 3.16 2.21
A.10.1.11.2 16.8.1.3.12 Cold Chain Technician Immunisation 1 1 15,215 761 15,976 3,994 19,970 2.40 1.68
A.10.1.11.3 16.8.1.3.12Store Assistant at FW Store (Base rationalized as
per State decision)FP 1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
A.10.1.9 16.8.1.3.12 Driver Admin. & Off.
Establishment3 3 11,025 551 11,576 2,894 14,470 5.21 3.65
16.8.1.3.12 Technical OfficerViral Hepatites State
Lab 1 1 55,566 13,892 69,458 8.33 4.17
16.8.1.3.12 Data Entry Operator
Viral Hepatites (State
Lab/ Model treatment
Centre)
2 2 13,892 3,473 17,365 4.17 2.08
To be out sourced
Budget for 1 DEO has
been shifted from FMR:
8.1.16.6 to 16.8.1.3.12
10 4 14 54.36 35.55 Sub-total of 16.8.1.3.12
Page 236 of 280
16.8.2.1.Dist.HR_RMNCH+A & HSS
Exisiting New Total
District Programme Manager 30 0 30 233.17 163.22
At KBK 11 11 48,510 2,426 50,936 12,734 3,000 66,670 88.00 61.60
At Non-KBK 19 19 48,510 2,426 50,936 12,734 63,670 145.17 101.62
A.10.2.4.1 16.8.2.1.1Project Officer - Operation at Regional level - e-VIN
(Budget proposed for 3 months)5 5 - - - 60,000 9.00 9.00
Deputy Manager RCH 30 0 30 183.41 128.39
At KBK 11 11 38,147 1,907 40,054 10,014 2,400 52,468 69.26 48.48
At Non-KBK 19 19 38,147 1,907 40,054 10,014 50,068 114.16 79.91
Asst. Manager IEC/BCC & Training 15 0 15 74.79 52.35
At KBK 5 5 31,201 1,560 32,761 8,190 1,800 42,751 25.65 17.96
At Non-KBK 10 10 31,201 1,560 32,761 8,190 40,951 49.14 34.40
Asst. Manager Legal Affairs & Institutional
Strengthening30 0 30 149.80 104.86
At KBK 11 11 31,201 1,560 32,761 8,190 1,800 42,751 56.43 39.50
At Non-KBK 19 19 31,201 1,560 32,761 8,190 40,951 93.37 65.36
Asst. Manager RBSK/RKSK 35 0 35 174.37 122.06
At KBK 11 11 31,201 1,560 32,761 8,190 1,800 42,751 56.43 39.50
At Non-KBK 24 24 31,201 1,560 32,761 8,190 40,951 117.94 82.56
Jr. Hospital Manager at SDH 26 0 26 86.19 60.34
At KBK 6 6 20,837 1,042 21,879 5,470 1,200 28,549 20.56 14.39
At Non-KBK 20 20 20,837 1,042 21,879 5,470 27,349 65.64 45.95
A.10.2.4.6 16.8.2.1.1 Sr. Hospital Manager 1 1 78,829 3,941 82,770 20,693 1,03,463 12.42 8.69
A.10.2.4.7 16.8.2.1.1 Hospital Manager at MCH & other institutions 12 12 38,367 1,918 40,285 10,071 50,356 72.51 50.76
Hospital Manager at district 34 0 34 169.46 118.62
At KBK 11 11 31,201 1,560 32,761 8,190 1,800 42,751 56.43 39.50
At Non-KBK 23 23 31,201 1,560 32,761 8,190 40,951 113.02 79.12
Asst. Manager ASHA 30 0 30 149.80 104.86
At KBK 11 11 31,201 1,560 32,761 8,190 1,800 42,751 56.43 39.50
At Non-KBK 19 19 31,201 1,560 32,761 8,190 40,951 93.37 65.36
Asst. Manager, GKS & Health System Stregthening 30 0 30 31,201 149.58 104.71
At KBK 10 10 31,201 1,560 32,761 8,190 1,800 42,751 51.30 35.91
At Non-KBK 20 20 31,201 1,560 32,761 8,190 40,951 98.28 68.80
273 0 273 1,464.51 1,027.85
Epidemiologist
At KBK (with Medical Background) 11 11 56,228 2,811 59,039 14,760 3,000 76,799 101.37 70.96
At Non-KBK (without Medical Background) 19 19 52,920 2,646 55,566 13,892 69,458 158.36 110.85
30 0 30 259.74 181.82
District Data Manager 30 0 30 183.41 128.39
At KBK 11 11 38,147 1,907 40,054 10,014 2,400 52,468 69.26 48.48
At Non-KBK 19 19 38,147 1,907 40,054 10,014 50,068 114.16 79.91
Block Data Manager (Urban) (Base rationalized as per
State decision)50 0 50 105.25 73.67
At KBK 11 11 13,230 662 13,892 3,473 800 18,165 23.98 16.78
Remuneration for District level HR under RMNCH+A & HSS
Sub-total of 16.8.2.1.1
Sub-total of 16.8.2.1.2
A.10.2.6.2
B1.1.5.2 16.8.2.1.1
A.10.2.4.8 16.8.2.1.2
16.8.2.1.5
A.10.2.3 16.8.2.1.5
A.10.2.4.1 16.8.2.1.1
A.10.2.4.2 16.8.2.1.1
A.10.2.4.3 16.8.2.1.1
A.10.2.4.4 16.8.2.1.1
A.10.2.4.5 16.8.2.1.1
A.10.2.4.7 16.8.2.1.1
B1.1.5.2 16.8.2.1.1
Total
Total amount per
annum (Rs. In
lakhs)
Total amount
Approved (70%)
16.8.2.1.1A.10.2.1
At District level
Old FMR KBK
incentive New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Page 237 of 280
16.8.2.1.Dist.HR_RMNCH+A & HSS
Exisiting New Total
Total
Total amount per
annum (Rs. In
lakhs)
Total amount
Approved (70%) Old FMR
KBK
incentive New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
At Non-KBK 39 39 13,230 662 13,892 3,473 17,365 81.27 56.89
80 0 80 288.66 202.06
District Accounts Manager 30 0 30 200.08 140.06
At KBK 11 11 41,675 2,084 43,759 10,940 2,400 57,099 75.37 52.76
At Non-KBK 19 19 41,675 2,084 43,759 10,940 54,699 124.71 87.30
Accountant-cum- DEO at DPMU 184 0 184 447.90 313.53
At KBK 58 58 15,215 761 15,976 3,994 1,000 20,970 145.95 102.17
At Non-KBK 126 126 15,215 761 15,976 3,994 19,970 301.95 211.36
Finance & Logistic Assistant (NVBDCP) 30 0 30 84.42 59.09
At KBK 11 11 17,530 877 18,407 4,602 1,200 24,209 31.96 22.37
At Non-KBK 19 19 17,530 877 18,407 4,602 23,009 52.46 36.72
Accountant-cum-DEO at DHH 32 0 32 78.00 54.60
At KBK 11 11 15,215 761 15,976 3,994 1,000 20,970 27.68 19.38
At Non-KBK 21 21 15,215 761 15,976 3,994 19,970 50.32 35.23
Accountant-cum-DEO at SDH 26 0 26 63.03 44.12
At KBK 6 6 15,215 761 15,976 3,994 1,000 20,970 15.10 10.57
At Non-KBK 20 20 15,215 761 15,976 3,994 19,970 47.93 33.55
302 0 302 873.43 611.40
Office Assistant at DPMU (Base rationalized as per
State decision)
At KBK 11 11 13,230 662 13,892 3,473 800 18,165 23.98 16.78
At Non-KBK 19 19 13,230 662 13,892 3,473 17,365 39.59 27.71
30 0 30 63.57 44.50
DEO at DPMU (Base rationalized as per State
decision)106 0 106 224.63 157.24
At KBK 39 39 13,230 662 13,892 3,473 800 18,165 85.01 59.51
At Non-KBK 67 67 13,230 662 13,892 3,473 17,365 139.61 97.73
DEO at DHH (Base rationalized as per State decision) 113 0 113 237.58 166.31
At KBK 22 22 13,230 662 13,892 3,473 800 18,165 47.96 33.57
At Non-KBK 91 91 13,230 662 13,892 3,473 17,365 189.63 132.74
219 0 219 462.21 323.55
Asst. Engineer 33 0 33 197.43 138.20
At KBK 11 11 37,375 1,869 39,244 9,811 2,400 51,455 67.92 47.54
At Non-KBK 22 22 37,375 1,869 39,244 9,811 49,055 129.51 90.65
Work Consultant 106 0 106 470.36 329.25
At KBK 34 34 27,783 1,389 29,172 7,293 1,600 38,065 155.31 108.71
At Non-KBK 72 72 27,783 1,389 29,172 7,293 36,465 315.06 220.54
Sickle Cell Project 23 0 23 99.72 69.81
Referral Center at VSS MCH
Sr. Health Manager (O&G Spl.) 1 1 56,007 2,800 58,807 14,702 73,509 8.82 6.17
Sr. Manager 1 1 41,454 2,073 43,527 10,882 54,409 6.53 4.57
Scientific Officer 2 2 41,454 2,073 43,527 10,882 54,409 13.06 9.14
Accounts Officer (Jr.) 1 1 31,201 1,560 32,761 8,190 40,951 4.91 3.44
Research Assistant 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
Programme Assistant 2 2 24,696 1,235 25,931 6,483 32,414 7.78 5.45
B5.4.2 16.8.2.1.11
A.10.2.8.2 16.8.2.1.11
Sub-total of 16.8.2.1.5
Sub-total of 16.8.2.1.7
Sub-total of 16.8.2.1.8
Sub-total of 16.8.2.1.9
A.10.2.5.2 16.8.2.1.7
B5.4.2 16.8.2.1.11
A.10.2.6.2
A.10.2.6.4 16.8.2.1.9
A.10.2.5.3 16.8.2.1.7
A.10.2.5.4 16.8.2.1.7
16.8.2.1.5
A.10.2.6.1 16.8.2.1.9
A.10.2.5.1 16.8.2.1.7
A.10.2.2 16.8.2.1.7
A.10.2.6.3 16.8.2.1.8
Page 238 of 280
16.8.2.1.Dist.HR_RMNCH+A & HSS
Exisiting New Total
Total
Total amount per
annum (Rs. In
lakhs)
Total amount
Approved (70%) Old FMR
KBK
incentive New FMR Designation
No. of staff
Bas
e 2
01
7-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
Office Assistant (Base rationalized as per State
decision)1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
Computer Operator (DEO) (Base rationalized as per
State decision)1 1 13,230 662 13,892 3,473 17,365 2.08 1.46
At district level
Programme Assistant 12 12 24,696 1,235 25,931 6,483 32,414 46.68 32.67
Manpower under Immunisation
Regional Vaccine & Cold Chain Manager 8 1 9 43.81 30.67
At KBK 3 1 4 31,201 1,560 32,761 8,190 1,800 42,751 19.24 13.47
At Non-KBK 5 5 31,201 1,560 32,761 8,190 40,951 24.57 17.20
Logistic Manager (Logistic, PROMIS & Immunisation) 32 0 32 126.58 88.61
At KBK 11 11 24,696 1,235 25,931 6,483 1,600 34,014 44.90 31.43
At Non-KBK 21 21 24,696 1,235 25,931 6,483 32,414 81.68 57.18
Cold Chain Technician 24 0 24 58.28 40.80
At KBK 8 8 15,215 761 15,976 3,994 800 20,770 19.94 13.96
At Non-KBK 16 16 15,215 761 15,976 3,994 19,970 38.34 26.84
WIC Operator at RVS/SVS (Base rationalized as per
State decision)36 4 40 82.71 57.90
At KBK 12 4 16 13,230 662 13,892 3,473 800 18,165 32.70 22.89
At Non-KBK 24 24 13,230 662 13,892 3,473 17,365 50.01 35.01
Immunization Computer Assistant 30 0 30 72.95 51.06
At KBK 11 11 15,215 761 15,976 3,994 800 20,770 27.42 19.19
At Non-KBK 19 19 15,215 761 15,976 3,994 19,970 45.53 31.87
292 5 297 1,151.84 806.29
A.10.2.8.2 16.8.2.1.11
Sub-total of 16.8.2.1.11
16.8.2.1.11
A.10.2.8.1.1
A.10.2.8.1.2
A.10.2.8.1.3
A.10.2.8.1.4
C.2.2
Page 239 of 280
16.8.3.1.Block.HR_RMNCH+A & HSS
Exisiting New Total
Block Programme Manager
At KBK 102 102 20,837 1,042 21,879 5,470 1,200 28,549 349.44 244.61
At Non-KBK 212 212 20,837 1,042 21,879 5,470 27,349 695.76 487.03
314 0 314 1,045.20 731.64
Block Data Manager (Base rationalized as per State
decision)
At KBK 102 102 13,230 662 13,892 3,473 800 18,165 222.34 155.64
At Non-KBK 212 212 13,230 662 13,892 3,473 17,365 441.77 309.24
314 0 314 664.11 464.87
Block Accounts Manager
At KBK 102 102 15,215 761 15,976 3,994 1,000 20,970 256.67 179.67
At Non-KBK 212 212 15,215 761 15,976 3,994 19,970 508.04 355.63
314 0 314 764.71 535.30
Sub-total of 16.8.3.1.5
A.10.3.2 16.8.3.1.7
Sub-total of 16.8.3.1.7
At Block level
A.10.3.1 16.8.3.1.1
Sub-total of 16.8.3.1.1
A.10.3.3 16.8.3.1.5
16.8.3.1. Block level HR under RMNCH+A & HSS
Total
amount
Approved
Old FMR New FMR DesignationNo. of staff
Bas
e
20
17
-18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
Total
amount per
annum (Rs.
Page 240 of 280
14.1.1.1.HR_Drug warehouses
Exisiting New Total
SDMU
Procurement Manager 1 1 55,456 2,773 58,229 14,557 72,786 8.73 3.55
Accounts Manager 1 1 48,510 2,426 50,936 12,734 63,670 7.64 3.10
Logistic Manager 1 1 48,510 2,426 50,936 12,734 63,670 7.64 3.10
Jr. Programme Coordinator (DMIS) 3 3 27,783 1,389 29,172 7,293 36,465 13.13 5.33
Jr. Programme Coordinator PROMIS 1 1 27,783 1,389 29,172 7,293 36,465 4.38 1.78
Account Assistant - cum - DEO 1 1 24,696 1,235 25,931 6,483 32,414 3.89 1.58
Pharmacist cum Logistic Asst. (Malaria) 1 1 11,011 551 11,562 2,891 14,453 1.73 0.66
9 0 9 47.14 19.10
State Equipment Maintenance Unit (SEMU) (State Unit
+ zonal units(3))
Bio-Medical Enginner 3 3 48,510 2,426 50,936 12,734 63,670 22.92 9.31
Jr. Engineer 9 9 27,783 1,389 29,172 7,293 36,465 39.38 16.00
MIS Coordinator 1 1 27,783 1,389 29,172 7,293 36,465 4.38 1.78
Technician 5 5 20,837 1,042 21,879 5,470 27,349 16.41 6.66
28 0 28 83.09 33.75
System In-charge (Base rationalized as per State
decision)
At KBK 11 11 13,230 662 13,892 3,473 800 18,165 23.98 9.74
At Non-KBK 24 24 13,230 662 13,892 3,473 17,365 50.01 20.31
35 0 35 73.99 30.05
Pharmacist (Logistic Assistant)
At KBK 11 11 10,309 515 10,824 2,706 13,530 17.86 7.25
At Non-KBK 21 21 10,309 515 10,824 2,706 13,530 34.10 13.85
32 0 32 51.96 21.10
104 0 104 256.18 104.00
Total amount
Approved Old FMR New FMR Designation
No. of staff
Bas
e
20
17
-18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
Total amount
per annum
(Rs. In lakhs)
B.17.1.1.2 14.1.1.1
14.1.1.1. Human Resources for Drug warehouses
Total of 14.1.1.1
14.1.1.1B.17.1.1
Sub-total of SDMU
Sub-total of SEMU
B.17.3.2 14.1.1.1
At State level
Sub-total of System In-charge
At District level
Sub-total of Pharmacist
B.17.1.1.2 14.1.1.1
Page 241 of 280
DCP
Exisiting New Total
E.1.1 16.8.1.4.11 State Epidemiologist 1 1 52920 2646 55566 13892 69458 8.33 5.83
E.1.2 16.8.1.4.11 State Microbiologist 1 1 52920 2646 55566 13892 69458 8.33 5.83
E.1.4 16.8.1.4.2 State Consultant (Training) 1 1 48510 2426 50936 12734 63670 7.64 5.35
E.1.5 16.8.1.4.11 State Entomologist (Non Medical) 1 1 48510 2426 50936 12734 63670 7.64 5.35
E.1.6 16.8.1.4.7 State Consultant Finance (Accountant) 1 1 25358 1268 26626 6657 33283 3.99 2.80
E.1.7 16.8.1.4.5State Data Manager (Base rationalized as per State's
decision)1 1 33000 1650 34650 8663 43313 5.20 3.64
E.1.8 16.8.1.4.9State Data Entry Operator (Base rationalized as per
State's decision)1 1 13230 662 13892 3473 17365 2.08 1.46
E.1.11 16.8.2.2.5 District Data Manager 30 30 22050 1103 23153 5788 28941 104.19 72.93
A.10.2.4.8 16.8.2.1.2 District Epidemiologist 30 30
67 103.19
G.3.2.a.i 16.8.1.4.2 State Leprosy Consultant 1 1 45864 2293 48157 12039 60196 7.22 5.06
G.3.2.a.ii 16.8.1.4.7 BFO cum Admn. Officer 1 1 41278 2064 43342 10836 54178 6.50 4.55
G.3.2.a.iii 16.8.1.4.8 Admn. Asstt. 1 1 17420 871 18291 4573 22864 2.74 1.92
G.3.2.a.iv 16.8.1.4.9Data entry operator (Base rationalized as per State's
decision)1 1 13230 662 13892 3473 17365 2.08 1.46
G.3.2.b.i 16.8.2.2.2 District Leprosy Consultant 22 22 30958 1548 32506 8127 40633 107.27 75.09
26 88.08
F.1.1.a.iii.1 16.8.1.4.4 State Coordinator-cum-M&E 1 1 56007 2800 58807 14702 73509 8.82 6.17
F.1.1.a.iii.1 16.8.1.4.2 Consultant (Entomologist) Tech 1 1 56007 2800 58807 14702 73509 8.82 6.17
F.1.1.a.iii.1 16.8.1.4.2 Consultant (Training) 1 1 56007 2800 58807 14702 73509 8.82 6.17
F.1.1.a.iii.1 16.8.1.4.2 Consultant (Procurement & Supply chain) 1 1 48510 2426 50936 12734 63670 7.64 5.35
F.1.1.a.iii.1 16.8.1.4.2 Consultant (Financial Management ) 1 1 48510 2426 50936 12734 63670 7.64 5.35
F.1.1.a.iii.1 16.8.1.4.2 Consultant (Social Mobilisation/ NGO/ PPP) 1 1 48510 2426 50936 12734 63670 7.64 5.35
F.1.1.a.iii.1 16.8.1.4.2 IEC/ BCC Consultant 1 1 48510 2426 50936 12734 63670 7.64 5.35
F.1.1.a.iii.1 16.8.1.4.2 Consultant vector control 1 1 48510 2426 50936 12734 63670 7.64 5.35
F.1.1.a.iii.1 16.8.1.4.5 Data Manager 1 1 31201 1560 32761 8190 40951 4.91 3.44
F.1.1.a.iii.1 16.8.1.4.7 Accountant 1 1 20837 1042 21879 5470 27349 3.28 2.30
F.1.1.a.iii.1 16.8.1.4.8 Secretarial Assistant 1 1 17530 877 18407 4602 23009 2.76 1.93
F.1.1.a.iii.1 16.8.1.4.11 Insect Collector 2 2 17530 877 18407 4602 23009 5.52 3.87
District VBD Consultant 30 128.57
At KBK 11 11 38147 1907 40054 10014 2600 52668 69.52 48.67
At Non-KBK 19 19 38147 1907 40054 10014 50068 114.16 79.91
Sentinel Site Malaria Technician cum Coordinator
(Multiskilling)90 153.53
At KBK 38 38 15215 761 15976 3994 800 20770 94.71 66.30
At Non-KBK 52 52 15215 761 15976 3994 19970 124.61 87.23
VBD Technical Supervisor (MTS) 180 307.39
At KBK 81 81 15215 761 15976 3994 800 20770 201.88 141.32
At Non-KBK 99 99 15215 761 15976 3994 19970 237.24 166.07
300 646.29
NLEP
Human Resources for Disease Control Programme
Old FMR New FMR DesignationNo. of staff
Bas
e
20
17
-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
Total amount
per annum
Total amount
Approved IDSP
Sub Total IDSP
Sub Total NLEP
NVBDCP
F.1.1.a.ii 16.8.2.2.2
F.1.1.a.iii.4 16.8.2.2.11
F.1.1.a.i 16.8.2.2.11
Sub Total NVBDCP
Budgeted under 16.8.2.1.2
Page 242 of 280
DCP
Exisiting New TotalOld FMR New FMR Designation
No. of staff
Bas
e
20
17
-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive Total
Total amount
per annum
Total amount
Approved
H.12.1 16.8.1.4.11 Asst Programme Officer/Epidemiologist 1 1 56007 2800 58807 14702 73509 8.82 6.17
H.12.1 16.8.1.4.11 Medical Officer – STC 1 1 48510 2426 50936 12734 63670 7.64 5.35
H.12.1 16.8.1.4.4 DRTB Coordinator 1 1 48510 2426 50936 12734 63670 7.64 5.35
H.12.1 16.8.1.4.4 TB/HIV Coordinator 1 1 48510 2426 50936 12734 63670 7.64 5.35
H.12.1 16.8.1.4.4 PPM Cordinator 1 1 48510 2426 50936 12734 63670 7.64 5.35
H.12.1 16.8.1.4.11 ACSM Officer 1 1 31311 1566 32877 8219 41096 4.93 3.45
H.12.1 16.8.1.4.7 Accounts Officer 1 1 48510 2426 50936 12734 63670 7.64 5.35
H.12.1 16.8.1.4.11 Store Assistant 1 1 12789 639 13428 3357 16785 2.01 1.41
H.12.1 16.8.1.4.8 Jr. Prog. Asst. (DEO (State TB Cell)/Office assistant) 1 1 17420 871 18291 4573 22864 2.74 1.92
H.12.1 16.8.1.4.8 Jr. Prog. Asst.(DEO (IRL)/Office assistant) 1 1 17420 871 18291 4573 22864 2.74 1.92
H.12.1 16.8.1.4.8 Jr. Prog. Asst.(Secretarial Asst) 1 1 17420 871 18291 4573 22864 2.74 1.92
District Programme Coordinator 31 85.88
At KBK 11 11 24696 1235 25931 6483 1600 34014 44.90 31.43
At Non-KBK 20 20 24696 1235 25931 6483 32414 77.79 54.46
Cordinator PPP (Re-designated from PPM Cordinator) 31 71.95
At KBK 11 11 20727 1036 21763 5441 1200 28404 37.49 26.25
At Non-KBK 20 20 20727 1036 21763 5441 27204 65.29 45.70
District PMDT TB-HIV Coordinator 31 71.95
At KBK 11 11 20727 1036 21763 5441 1200 28404 37.49 26.25
At Non-KBK 20 20 20728 1036 21764 5441 27205 65.29 45.70
STS 318 619.31
At KBK 102 102 17420 871 18291 4573 1000 23864 292.10 204.47
At Non-KBK 216 216 17420 871 18291 4573 22864 592.63 414.84
STLS 109 212.03
At KBK 32 32 17420 871 18291 4573 1000 23864 91.64 64.15
At Non-KBK 77 77 17420 871 18291 4573 22864 211.26 147.88
H.12.2 16.8.2.2.11 Driver 31 31 11025 551 11576 2894 14470 53.83 37.68
H.12.2 16.8.2.2.11 SA- DRTB Centre 4 4 20727 1036 21763 5441 27204 13.06 9.14
H.11.2.2.3.6 16.8.1.4.11 Driver for Mobile IEC Van 1 1 11025 551 11576 2894 14470 1.74 1.22
566 1151.48
959 1989.04
38.48
49.50
22.22
14.99
7.08
2.92
9.62
203.66
229.78
72.93
507.74
831.34
RNTCP
H.12.2 16.8.2.2.4
Sub total of 16.8.1.4.4
Sub total of 16.8.1.4.7
Sub total of 16.8.1.4.5
Sub total of 16.8.1.4.9
H.12.2 16.8.2.2.4
H.12.2 16.8.2.2.4
H.12.2 16.8.3.2.11
Sub total of 16.8.3.2.11
District LevelSub total of 16.8.2.2.2
Sub total of 16.8.2.2.4
Sub total of 16.8.2.2.5
Sub total of 16.8.2.2.11
Block Level
Sub total of 16.8.1.4.8
H.12.2 16.8.3.2.11
Sub Total RNTCP
Grand Total DCP
State Level
Sub total of 16.8.1.4.11
Sub total of 16.8.1.4.2
Page 243 of 280
NCD
Exisiting New Total
16.8.1.5.7 Budget & Finance Officer 1 1 48510 2426 50936 12734 63670 7.64 5.35
16.8.1.5.8 Admin. Asst. (Jr. Prog. Asst.) 1 1 17287 864 18151 4538 22689 2.72 1.91
16.8.1.5.9 Data Entry Operator (Base rationalized as per State decision) 1 1 13230 662 13892 3473 17365 2.08 1.46
16.8.1.5.10 Support staff (Base rationalized as per State decision) 1 1 10082 504 10586 2647 13233 1.59 1.11
4 9.82
16.8.1.5.2 Consultant Cat-II 1 1 48,510 2426 50936 12734 63670 5.73 4.01
M.3.4.1 16.8.1.5.2 State Consultant NTCP 1 1 48510 2426 50936 12734 63670 7.64 5.35
M.3.4.2 16.8.1.5.7 Legal Consultant or Finance Consultant 1 1 31201 1560 32761 8190 40951 4.91 3.44
M.3.4.3 16.8.1.5.3 Programme Assistant 1 1 24696 1235 25931 6483 32414 3.89 2.72
District Consultant NTCP 30 104.86
At KBK 11 11 31201 1560 32761 8190 1800 42751 56.43 39.50
At Non-KBK 19 19 31201 1560 32761 8190 40951 93.37 65.36
33 116.37
O.2.1.1.1 16.8.1.5.11 Epidemiologist/ Public Health specialist 1 1 56007 2800 58807 14702 73509 8.82 6.17
O.2.1.1.2 16.8.1.5.4 State Programme coordinator 1 1 56007 2800 58807 14702 73509 8.82 6.17
O.2.1.1.3 16.8.1.5.2 Finance cum logistics consultant 1 1 41454 2073 43527 10882 54409 6.53 4.57
O.2.1.1.4 16.8.1.5.9 State Data Entry Operator (Base rationalized as per State decision) 1 1 13230 662 13892 3473 17365 2.08 1.46
District Programme coordinator 4 11.14
At KBK 4 4 24035 1202 25237 6309 1600 33146 15.91 11.14
At Non-KBK 0 0 24035 1202 25237 6309 31546 - -
Finance cum logistics consultant 30 107.42
At KBK 11 11 31,973 1,599 33,572 8,393 1,800 43,765 57.77 40.44
At Non-KBK 19 19 31,974 1,599 33,573 8,393 41,966 95.68 66.98
Data entry operator CHC level (Base rationalized as per State
decision)10 15.26
At KBK 10 10 13,230 662 13,892 3,473 800 18,165 21.80 15.26
At Non-KBK 0 0 - - - - - -
48 152.19
86 282.40
8.79
1.91
2.92
1.11
13.93
2.72
6.17
6.17
212.28
11.14
15.26
Human Resources for Non Communicable Disease Control Programme
Old FMR New FMR DesignationNo. of staff
Bas
e
20
17
-
18
Increment
(5%)
Revised
Base
PI (Max
25%)
KBK
incentive
NPCDCS
Total Total
amount per
Total
amount NPCB
I.1.7
Sub Total NPCB
NMHP
NTCP
M.1.4.1 16.8.3.3.2
Sub Total NTCP
Sub Total of 16.8.1.5.9
O.2.1.2.2 16.8.2.3.4
O.2.1.2.3 16.8.2.3.2
O.2.1.2.4 16.8.2.3.9
Sub Total NPCDCS
Grand Total
State Level
Sub Total of 16.8.1.5.7
Sub Total of 16.8.1.5.8
Sub Total of 16.8.2.3.2
Sub Total of 16.8.2.3.4
Sub Total of 16.8.2.3.9
Sub Total of 16.8.1.5.10
Sub Total of 16.8.1.5.2
Sub Total of 16.8.1.5.3
Sub Total of 16.8.1.5.11
Sub Total of 16.8.1.5.4
District Level
Page 244 of 280
Viral Hepatites Annex
Sl No ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
1 Model Treatment Centre 7 4.28 Proposed at Deptt. of Herpetology SCB MCH, Cuttack
1.1 Remuneration
1.1.1 Nodal Officer 0.00 1 0.00 To be mobilised from System
1.1.2 Medical Officer Per Month 76150 0.76 1Budget Proposed for 6 Months
Approved in FMR: 8.1.5
1.1.3 Pharmacist Per Month 1 To be mobilised from System
1.1.4 Data Entry Operator Per Month 17365 0.17 1
To be out sourced
Budget Proposed for 6 Months
Approved in FMR: 8.1.16.6 , however shifted to FMR
16.8.1.3.12 as per decision
1.1.5 Peer Support Per Month 19970 0.20 1
Remuneration Proposed at par with Medical Social worker
Budget Proposed for 6 Months
Approved in FMR: 8.1.16.6
1.2 Contingency Lump sum 300000 3.00 1 3.00
1.3 Meetings/Trainings etc. Lump sum 128000 1.28 1 1.28
2 Treatment Centre To be Planned at all DHHs in 2019-20
3 State Lab 0.00 Planned at Deptt. of Microbiology SCB MCH, Cuttack
3.1 Manpower
3.1.1 Technical Officer Per Month 69458 0.69 1
Remuneration Proposed at par with State Microbiologist
(IDSP)
Budget Proposed for 6 Months
Approved in FMR: 16.8.1.3.12
3.1.2 Data Entry Operator Per Month 17365 0.17 1
To be out sourced
Budget Proposed for 6 Months
Approved in FMR: 16.8.1.3.12
3.1.3 Lab Technician Per Month 1 To be mobilised from System
3.2 Consumables Lump sum 500000 5.00 1 Approved in FMR: 16.1
3.3 Meetings/Trainings etc. Lump sum 600000 6.00 1 Approved in FMR: 16.1
Proposal on Prevention, Control & Treatment of Viral Hepatites in Odisha
Page 245 of 280
Viral Hepatites Annex
Sl No ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Proposal on Prevention, Control & Treatment of Viral Hepatites in Odisha
4 Reference Lab 0.00 Budget Not Approved
4.1 Contingency Lump sum 100000 1.00 0.00
4.2 Consumables Lump sum 100000 1.00 0.00
5 District LabPlanned to integrate with existing public Health Lab at all
Distinct level. Budget will be proposed in next FY 2019-20
6 Programme Management Unit 0.00
6.1 Program In charge (CST) 1
6.2 Program In charge (Lab) 1
6.3
Program In charge
(Surveillance, M&E and
Research)
1
6.4 Program In charge (IEC/BCC) 1
6.5Program In charge
(Collaboration & Coordination)1
6.6Technical Officer (Surveillance,
M&E and Research)1
6.7Consultant (Finance and
Accounts)1
6.8Assistant (Finance and
Accounts)1
6.9Assistant(Admin and
Procurement)1
6.10 Data Entry Operator 4
6.11 Quality Manager(Lab) 1
6.12CST Coordinator (CST) Mgt.
Consultant (Cat-II)Per Month 0.00 0.00 Budget Not Approved
Grand Total 4.28
Existing Staff to manage
Page 246 of 280
Laqshya Budget Annex-17.1(Rev)
Sl
NoActivity
Unit Cost Appd.
By GoI
State
norm
(Unit Cost)
Units
RequiredTotal Cost Remarks Budget Head
1 9.5.1.22
a Accomodation per person per night 3000 850 24 20400 60% of total Participants
b Breakfast, Lunch and high tea per person 200 250 45 11250 40 part, 4 RPs, 1 Organiser
c Participants Kit per person 200 200 40 8000
d Venue Hiring Cost per day 5000 3000 1 3000
e Miscellaneous 10000 8000 1 8000 for certificate/ documentation and transportation cost
f Honorarium / per diem for trainers 600 4 2400
g Honorarium/ per diem for participants 0
a) TA 1000 40 40000
b)DA- Cat-I 400 30 12000
c) DA- Cat-II 300 10 3000
Total/ per batch 108050
Total Batches Proposed (2) 216100 Budget proposed for 2 batches
2 9.5.1.22
a Accomodation per person per night 600 6 3600
b Breakfast, Lunch and high tea per person 200 150 30 4500 25 part, 4 RPs, 1 Organiser
c Participants Kit per person 200 100 25 2500
d Venue Hiring Cost per day 5000 1500 1 1500
e Miscellaneous 10000 0
f Honorarium / per diem for trainers 300 4 1200
g Honorarium/ per diem for participants 0
a) TA 200 25 3500 70% budgeted
b)DA- Cat-I 400 5 2000
c) DA- Cat-II 250 20 5000
Total per batch 23800
Total Batches proposd (30) 714000 Budget proposed for 30 batches
3 State Mentoring visit plan (two visit/ month/ mentor)Proposed: two visit/ month/ mentor. Proposed for 15 State
Mentors except Mission Director.1.1.1.5
a Travel cost for vehicle hiring per day 3000 3000 15 1080000
b Honorarium per visit 700 700 15 252000
c Accommodation per night 3000 1500 15 540000
d Stationary 5000 2000 15 720000
Total 11700 7200 2592000
Total proposed (60%) 1555200 Due to all visits are not possible 60% of budget proposed
4 DCT visit plan (two visit/ month/ mentor)Total Targeted institutions: 98
two visit/ month/ Institution1.1.1.5
a Travel cost for vehicle hiring per trip 3000 1500 98 3528000
b Honorarium per visit 700 700 98 1646400
c Accommodation per night 3000 0 98 0
Stationary 5000 500 98 1176000
Total 11700 2700 6350400
Total proposed (60%) 3810240 Due to all visits are not possible 60% of budget proposed
Budget Templates for LaQshya
FMR Budget line number 9.5.1.22
1 day orientation for Prog. Officers , Prog. Managers, on "LaQshya Prgramme" at state level
1 day training for OG Spl ,Prog. Officers , Prog. Managers on "LaQshya Prgramme" at MCH &District level (Batch size: 25/batch
Page 247 of 280
Laqshya Budget Annex-17.1(Rev)
Sl
NoActivity
Unit Cost Appd.
By GoI
State
norm
(Unit Cost)
Units
RequiredTotal Cost Remarks Budget Head
5 District level review meeting (once every three month) To be taken up in existing monthly review platform
a Breakfast, Lunch and High Tea per person 200 0
b Participants kit per person 200 0
c Venue hiring cost per day 5000 0
d Miscellaneous 10000 0
Total 15400 0
6 State level review meeting (once every six month)
Total Participants: 161 (30 +30 +6 +95) ADMO(FW)-30, Dy.
Manager RCH-30, Two from each Medical College & Hospitals (3
Nos) and One Medical Officer from all 95 Targeted institutions.
2 Batches: 81 1st Batch + 80 2nd Batch
1.1.1.5
a Accomodation per person per night 850 97 164900 60% of total Participants
b Breakfast, Lunch and High Tea per person 200 250 161 80500
c Participants kit per person 200 100 161 32200
d Venue hiring cost per day 5000 3000 4 24000
e Miscellaneous 10000 10000 4 80000
f Honorarium/ per diem for participants 0
a) TA 1000 161 161000
b)DA- Cat-I 400 131 52400
c) DA- Cat-II 300 30 9000
Total 15400 15900 604000
7 Facility level quality improvement meetings (one/month/facility) 500 To be met out of RKS Fund
8 Human Resources State support
9
9.1 Mannequin Set 149000 149000 90 13410000
Mannequins will be made available in selected facilities for hands
on practice. Out of 98 Facilities Targeted, Mannequin set are
available in 8 Facilities.(DHH, Bargarh, DHH, Jagatsinghpur, DHH,
Sambalpur, CHC, Basudevpur, CHC-Balikuda, CHC-Ersama, SDH-
Kuchinda, SDH-Rairkhol). Hence the Mannequin Set has to
proposed for the rest 90 Facilities.
6.1.1.1.b
9.2 Procurement of Equipment State Budget
10 Awards as per LaQshya guideline 0 Planned in 2019-20 1.1.1.5
11 Incentives as per LaQshya guideline 0 Planned in 2019-20 1.1.1.5
12 Printing of guidelines 200000 1 200000 12.1.3
Grand Total 20509540
In Lakhs 205.10
Other procurement LR
Batch size: 80 (proposed to organise review meeting in two
phases)
Equipment/ Instruments
Page 248 of 280
Phulabani_NUHM
Phulabani
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.1 Service Delivery - Facility Based 0.00
U.1.1 Service Delivery 0.00
Support for control of Communicable Disease Not Approved
NVBDCP
Training of APM/CPMs on prevention, control & management
of urban VBDs
Training of Private practioners of 5 Municipal Corporations on
diagnosis and reporting of malaria
1 day training of Private practitioner Per batch 50,000.00
1 day Orientation of LTs of the leading patho labs of the
above 5 Municipal CorporationsPer batch 35,000.00
Strengthening of surveillance (malaria)
Sensitization meeting at state level Lumpsum 1,00,000.00
Printing of reporting formats & patient card Lumpsum 1,00,000.00
Notification of malaria cases Per case 300.00
Support for control of Non Communicable Disease Control Not approved
NPCB
Recurring cost (Opthalmic Asst.- Part time) 0.00 0.00
NPCDCS
Population based screening 0.00 0.00
NPHCE
Recurring cost (Physiotherapist-Part time) 0.00 0.00
Recurring cost for aids & appliances 0.00 0.00
U.1.1.3 Others 0.00 0.00
U.1.2 Beneficiary Compensation
U.1.2.1 JSY
U.1.2.2 Family Planning
NUHM: Abstract for Non-Metro cities
U.1.1.1 P.10.1
U.1.1.2
U.1.1.2
U.1.1.2
Page 249 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.1.3 Operating Expenses 0.00
Operational Expenses of UPHCs (excluding rent) Details at Operational Expenses Annexure
Mobility support for UPHCs Lumsum 0 0.00 1 0.00 Mobility support: UPHCs @ Rs. 2000/- p.m per UPHC
Office expenses for UPHCs Lumsum 0 0.00 1 0.00 Office expenses : @ Rs. 5000/- p.m per UPHC
Management cost to NGO/MC Lumsum 0 0.00 1 0.00Management cost to NGO/MC for @ Rs. 43,750/- per qtr per UPHC
Budgeted 80%
U.1.3.2 P.4.2.3.3 Operational Expenses of Maternity Homes(excluding rent) 0.00 0.00 Not proposed
U.1.3.3 P.4.2.3.4 Operational Expenses of Health KiosksPer Kiosk for 6
months7,200.00 0.07 0 0.00
Capital cost for 14 Kiosk in Bhubaneswar city @ Rs. 6 lakhs/ kiosks was approved
during 2013-14.The amount has been kept as committed liability .
Operational cost proposed - Rs. 1,200/-p.m.
U.1.3.4 Team based incentive- HWC Per UPHC 6,00,000.00 6.00 0 0.00 Detailed guideline to be issued from the State
U.2 Service Delivery - Community Based 2.21
U.2.1 Mobile Units 0.00
Mobile Medical Units (MMU) / Mobile Health Units (MHU)
UMHU operational expenses Per MHU 8,40,000.00 8.40 0 0.00
Proposal approved for 4 for Bhubaneswar, 1 for Rourkela, 1 for Sambalpur, 1 for
Cuttack, 1 for Berhampur& 1 for Jatani & Khordha)
Details of unit cost in MHU(Annx)
Server charges & SMS communication charges for UMHU Per MHU 3,600.00 0.04 0.00 Not Approved
U.2.1.2 Others 0.00 0.00 NA
U.2.2 Recurring/ Operational cost 0.24
U.2.2.1 P.4.5.3 Mobility support for ANM/LHVPer ANM Per
Annum6,000 0.06 4 0.24
Mobility support for all ANMs including regular ANMs for 12 months @ Rs. 500 per
month
U.2.2.2 Others 0.00 0.00
U.2.3 Outreach activities 1.97
U.2.3.1 P.4.5.1 UHNDs Per Session 250 0.00 384 0.77 Budgetd for 80% sessions
Special outreach camps in slums/ vulnerable areas
Special outreach camps proposed in 8 cities where
UPHCs/MHUs are not proposedPer Camp 1,20,000 1.20 1 1.20
Health check up of sanitary worker in urban cities Lumpsum 5,00,000 5.00 0 0.00
U.1.3.1 P.4.2.3.2
U.2.1.1 P.4.5.4
U.2.3.2 P.4.5.2
Page 250 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
Support for control of Communicable Disease
Incentive for dengue volunteers Per Volunter 12,000.00 0.12 State to bear from states own funds
Training of dengue volunteers Per batch 5,000.00 0.05 State to bear from states own funds
Urban TB Control plan
State Level Planning & Review Meeting Lumpsum 1,00,000.00 1.00 0 0.00
City level Meeting for Planning & Organisation Per MC 1,00,000.00 1.00 0 0.00City level Meeting for Planning & Organisation @ Rs. 25,000/- per quarter/ per City
x5 cities (Sambalpur, Berhampur, Rourkella, Cuttack, Bhubaneswar)
Urban Slum Interventions (Slum Level) Per Slum 2,00,000.00 2.00 0 0.00
Urban Slum Interventions (Slum Level) : Two urban slums each at Sambalpur,
Berhampur, Rourkella, Cuttack& Bhubaneswar to be covered @ Rs. 200,000/- per
annum . State to share detailed guidelines
U.2.3.4 Support for control of Non Communicable Disease Control 0.00 0.00
U.2.3.5 Others 0.00 0.00
U.3 Community Interventions 0.69
U.3.1 ASHA Activities 0.18
U.3.1.1 P.6.1.2 ASHA Incentives 0.18
Incentives for routine activities Per ASHA per
annum
Attending MAS meeting & updating recordsPer ASHA per
annum1,200 0.01 6 0.07 @Rs.100/- per month
Sharing of local issues for discussion in Ward Kalyan Samiti
meeting & updation of Swasthya Kantha
Per ASHA per
annum1,800 0.02 6 0.11 @Rs.150/- per month
U.3.1.1.1 P.6.1.2.1 HWC Activities Per UPHC 3,00,000 3.00 0 0.00 Separate guideline will be issued
U.3.1.1.2 P.6.1.2.2 Other Incentive to ASHAs (please specify) Per ASHA 1,000.00 0.01 0 0.00Special incentive for ASHAs of Puri for preventive action during special events (i.e.
Car festival) @ Rs. 1,000/- per ASHA
U.3.1.1.3 Others 0.00 0.00
U.3.1.2 P.6.1.1 ASHA Trainings for HWC Per batch 75,000.00 0.75 0 0.00
U.3.1.3 Miscellaneous ASHA Costs 0.00
U.3.1.3.1 P.6.1.5Other Non-Monetary Incentives Costs (badge, uniform, ID,
etc.)0 0.00 0.00
Budgeted under NHM
Budget head:
1. CUG for ASHA : Proposed under NHM
2. Uniform for ASHA: @ Rs.450/- per ASHA
3. I-card for ASHA: @ Rs.50/- per ASHA
4. Diary for ASHA: @ Rs.100/- per ASHA
U.3.1.1.1 P.6.1.2.1
U.2.3.3 P.10.1
U.2.3.3 P.10.1
Page 251 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.3.2 Other Community Interventions 0.51
U.3.2.1 P.6.2 MAS/community groups 0.51
U.3.2.1.1 P.6.2.2 Training of MAS Per MAS 2,700 0.03 19 0.51Budget approved as per last year
Refresher training (two day) @ Rs.2,700/- per MAS
U.3.2.1.2 P.6.3 Support to organization engaged for community processes 0.00 0.00
U.3.3 Panchayati Raj Institutions (PRIs)
U.3.4 Any Other 0.00
U.3.4.1 0.00 0.00
U.4 Untied grants 0.95
U.4.1.1 P.4.3.1 Untied grants to UPHCs 0.00
U.4.1.1.1 P.4.3.1.a Government Building Per UPHC 1,75,000.00 1.75 0 0.00 Rs. 1.75 lakhs per UPHC per annum in Govt owned building.
U.4.1.1.2 P.4.3.1.b Rented Building Per UPHC 1,00,000.00 1.00 0 0.00 Rs. 1.00 lakhs per UPHC per annum
U.4.1.2 P.4.3.2 Untied grants to UCHCs Per UCHC 5,00,000.00 5.00 0 0.00RKS grant for 7 UCHCs @ Rs. 5 lakhs per UCHC
4 UCHC at Bhubaneswar, 1 UCHC at Rourkela, 2 at Cuttack
U.4.1.3 P.4.3.3 Untied grants to Maternity Homes 0.00 0.00
U.4.1.4 P.6.2.1 Untied grants to MAS Per MAS 5,000.00 0.05 19 0.95 Performance graded incentive for MAS is at Innovation (U.118.1)
U.5 Infrastructure 0.00
U.5.1 Upgradation of existing facilities 0.00
UPHC - 0.00 0.00Not proposed as the allocation met for all ongoing projects from additional funds
received under NUHM during FY 2017-18.
Infrastructure strengthening for converting UPHC to UPHC
level HWCPer Unit 1,00,000.00 1.00 0 0.00 [email protected] lakhs
Lab strengthening at UPHC under HWC Per Unit 1,00,000.00 1.00 0 0.00 [email protected] lakhs
U.5.1.2 P.4.2.2.2 UCHC 0.00 0.00Not proposed as the allocation met for all ongoing projects from additional funds
received under NUHM during FY 2017-18.
U.5.1.3 P.4.2.2.2 Maternity Homes 0.00 0.00
U.5.1.1 P.4.2.2.1
Page 252 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.5.1.4 P.4.2.3 Operational Expenses (rent, telephone, electricity etc.) 0.00
U.5.1.4.1 P.4.2.3.1 Rent for UPHC Lumpsum 0 0.00 1 0.00
Approved rent :
Rs. 25,000/- p.m. per UPHC for Bhubaneswar (smart city)
Rs. 20,000 p.m. per UPHC for other 3 corporation cities (Cuttack, Berhampur,
Rourkela)
Rs. 15,000 p.m. per UPHC for non-corporation cities.
Total amount approved for 9 months:
For Bhubaneswar - Rs. (25,000 x 3 UPHCs x 9 months) = Rs.67,5,000/-
For other 3 corporation cities- Rs. (20,000 x 9 UPHCs x 9 months) = Rs.16,20,000/-
For non-corporation cities - Rs. (15,000 x 13 UPHCs x 9 months) = Rs.17,55,000/-
Details at Operational Expences Annexure
U.5.1.4.2 Any other (please specify)Per bed per
day64.00 0.00 0 0.00
Strenthening of Anciliary Services at UCHCs - (last year approved under old FMR-
P.7 under Innovation) -Ongoing activity with revised unit nos.
Total no. of functional UCHCs in new building - 4
Total bed strength - 204
Unit cost per bed per day - Rs. 64/- (proposed as approved last year)
Total budget proposed - Rs.64/- x 204 beds x 365 days = Rs. 47,65,440/-
Area of intervention –
• Housekeeping and cleanliness services
• Hospital linen and laundry services
• Security services
Modalities of implementation: Agencieshave been engaged through
outsourcedbasis.
Justification:Outsourcing of ancillary services would help in Kayakalpa and NQAS
accreditation.
U.5.2 New Constructions 0.00
U.5.2.1 P.4.2.1.1 UPHC Lumpsum 75,00,000.00 75.00 Not approved
U.5.2.2 P.4.2.1.2 UCHC - 0.00 0.00Not proposed as the allocation met for all ongoing projects from additional funds
received under NUHM during FY 2017-18.
U.5.2.3 P.4.2.1.3 Health Kiosk (for establishment) - 0.00 0.00
U.5.3 Other construction/ Civil works 0.00
U.5.3.1 0.00 0.00
Page 253 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.6 Procurement 0.00
U.6.1 Procurement of Equipments 0.00
U.6.1.1 P.4.4.2.1 Equipment for UPHC Per UPHC 3,00,000.00 3.00 0 0.00
Ongoing activity with revised unit nos.
Equipment for 4 UPHCs in rented building under PPP mode @ Rs. 3,00,000/- per
UPHC
U.6.1.2 P.4.4.2.2 Equipment for UCHC - 0.00 0.00Not proposed as the allocation met for all ongoing projects from additional funds
received under NUHM during FY 2017-18.
U.6.1.3 P.4.4.2.3 Equipment for Maternity Homes 0.00 0.00 Not proposed
Any other (please specify) 0.00 Details at Consumables UPHC & UCHC Annex
Consumables for UPHCs Lumpsum 0 0.00 1 0.00 Consumables for UPHCs: Rs. 2,000/- PM
Consumables for UCHCs Per UCHC 60,000 0.60 0 0.00 Consumables for UCHCs: 7 UCHCs for 12 months = Rs. 5000/- PM
Consumables for Lab at UPHC level HWC Per UPHCs 50,000 0.50 0 0.00
U.6.2 Procurement of Drugs & Supplies 0.00
U.6.2.1 P.4.4.1.1 Drugs and supplies for UPHC 0.00 0.00 State to supply
U.6.2.2 P.4.4.1.2 Drugs and supplies for UCHC 0.00 0.00 State to supply
U.6.2.3 P.4.4.1.3 Drugs and supplies for Maternity Homes 0.00 0.00 NA
U.6.2.4 Drugs & supplies for ASHA 0.00
U.6.2.4.1 P.6.1.3 ASHA Drug kits 0.00 0.00 State to supply
U.6.2.4.2 P.6.1.4 HBNC Kits 0.00 0.00 Proposed under NHM
U.6.2.4.3 P.4.4.1.4 Any other drugs & supplies (please specify) 0.00 0.00 NA
U.6.3 Procurement of Other Drugs and supplies (please specify) 0.00
U.6.3.1 0.00 0.00
U.6.4 National Free Diagnostic Services
U.6.5 Procurement (Others) 0.00 0.00
U.7 Referral Transport 0.00Proposal for 102 & 108 services have been placed at referral transport (FMR-7)
under NHM
U.7.1 0.00 0.00
U.8 Service Delivery - Human Resource 5.79As per state mandate, planning has been made to move from contractual mode to
regular mode of engagement in case of clinical & paramedical staff.
U.8.1 Human Resources 4.69
U.8.1.1 P.4.1.1 ANMs/LHVs 4.69
U.8.1.1.1 P.4.1.1.1 UPHCPer ANM Per
Annum1,67,640.00 1.68 4 4.69
2017-18 Base - Rs.10644/- (Base rationalized as per State decision) + Increment
(5%) - Rs.532/- = Base 2018-19 @Rs.11176/- + PI (Max 25%) - Rs.2794/- = Rs.13970/-
p.m.
Budgeted 70%
Details at NUHM Clinical HR annexure
U.8.1.1.2 P.4.1.1.2 UCHC 0.00 0.00 Not proposed
U.6.1.4
Page 254 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.8.1.1.3 P.4.1.1.3 Maternity Homes 0.00 0.00 Not proposed
U.8.1.2 P.4.1.2 Staff nurse 0.00
U.8.1.2.1 P.4.1.2.1 UPHCPer SN Per
Annum215436 2.15 0 0.00
2017-18 Base - Rs.13678/- (Base rationalized as per State decision) + Increment
(5%) - Rs.684/- = Base 2018-19 @Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/-
p.m.
Budgeted 70%.
Details at NUHM Clinical HR annexure
U.8.1.2.2 P.4.1.2.2 UCHCPer SN Per
Annum215436 2.15 0 0.00
2017-18 Base - Rs.13678/- (Base rationalized as per State decision) + Increment
(5%) - Rs.684/- = Base 2018-19 @Rs.14362/- + PI (Max 25%) - Rs.3591/- = Rs.17953/-
p.m.
Budgeted 70%.
Details at NUHM Budget annexure - Clinical HR (annex)
U.8.1.2.3 P.4.1.2.3 Maternity Homes 0.00 0.00 NA
U.8.1.3 P.4.1.6 Lab Technicians 0.00
U.8.1.3.1 P.4.1.6.1 UPHC Lumpsum 0 0.00 1 0.00
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/-
p.m.
Budgeted 70%.
Details at NUHM Clinical HR annexure
U.8.1.3.2 P.4.1.6.2 UCHCPer LT Per
Annum173436 1.73 0 0.00
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/-
p.m.
Budgeted 70%.
Details at NUHM Clinical HR annexure
U.8.1.3.3 P.4.1.6.3 Maternity Homes 0.00 0.00 NA
U.8.1.4 P.4.1.7 Pharmacists 0.00
U.8.1.4.1 P.4.1.7.1 UPHC Lumpsum 0 0.00 1 0.00
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/-
p.m.
Budgeted 70%.
Details at NUHM Clinical HR annexure
U.8.1.4.2 P.4.1.7.2 UCHCPer Pharm.
Per Annum173436 1.73 0 0.00
2017-18 Base - Rs.11011/- (Base rationalized as per State decision) + Increment
(5%) - Rs.551/- = Base 2018-19 @Rs.11562/- + PI (Max 25%) - Rs.2891/- = Rs.14453/-
p.m.
Budgeted 70%.
Details at NUHM Clinical HR annexure
U.8.1.4.3 P.4.1.7.3 Maternity Homes 0.00 0.00 NA
U.8.1.5 P.4.1.8 Other staff 0.00
U.8.1.5.1 P.4.1.8.1 X-ray technicians 0.00 0.00 Not proposed
U.8.1.5.2 P.4.1.9.2 OT Assistant 0.00 0.00 Not proposed
U.8.1.5.3 P.4.1.8.3 Any other (please specify) 0.00 0.00 Not proposed
U.8.1.6 P.4.1.5 Specialists (at UCHC) 0.00
Page 255 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.8.1.6.1 P.4.1.5.1 Obstetrician / Gynaecologist 0.00 0.00 Not proposed
U.8.1.6.2 P.4.1.5.2 PaediatricianPer Spl. Per
Annum9,92,256 9.92 0 0.00 Details at NUHM Clinical HR Annexure
U.8.1.6.3 P.4.1.5.3 Anaesthetist 0.00 0.00 Not proposed
U.8.1.6.4 P.4.1.5.4 Surgeon 0.00 0.00 Not proposed
U.8.1.6.5 P.4.1.5.5 Pathologist 0.00 0.00 Not proposed
U.8.1.6.6 P.4.1.5.6 Radiologist 0.00 0.00 Not proposed
U.8.1.6.7 P.4.1.5.7 Other SpecialistsPer Spl. Per
Annum9,92,256 9.92 0 0.00 Details at NUHM Clinical HR annexure
U.8.1.7 Dental Staff 0.00
U.8.1.7.1 P.4.1.5.7 Dentists 0.00 0.00 Not proposed
U.8.1.8 Medical Officers 0.00
U.8.1.8.1 P.4.1.3.1 MO at UPHC 0.00
U.8.1.8.1.1 P.4.1.3.1.1 Full-time Lumpsum - 0.00 1 0.00 Details at NUHM Clinical HR annexure
U.8.1.8.1.2 P.4.1.3.1.2 Part-time Lumpsum - 0.00 1 0.00 Details at Part Time MO Annexure
U.8.1.8.2 P.4.1.3.2 MO at Maternity Homes 0.00
U.8.1.8.2.1 P.4.1.3.2.1 Full-time 0.00 0.00 Not proposed
U.8.1.8.2.2 P.4.1.3.2.2 Part-time 0.00 0.00 Not proposed
U.8.1.8.3 P.4.1.4 MO at UCHC 0.00
U.8.1.8.3.1 P.4.1.4.1 Full-time Lumpsum - 0.00 1 0.00 Details at NUHM Clinical HR annexure
U.8.1.8.3.2 P.4.1.4.1 Part-time Lumpsum 4,32,000 4.32 0 0.00MO (Part-time)
Details at Part Time MO Annexure
U.8.1.9 Administrative Staff 0.00
U.8.1.9.1 P.4.1.9 Public Health Manager/Facility Manager 0.00
UPHC
Public Health Manager for KBK District Per PHM 3,24,552 3.25 0 0.00
KBK district - 2017-18 Base - Rs.19,845/- + Increment (5%) - Rs.992/- = Base 2018-19
@Rs.20,837/- + PI (Max 25%) - Rs.5209/- + KBK Rs. 1,000/- = Rs.27,046/- p.m.
Budgeted 70%
Details at NUHM District Level HR annexure
Public Health Manager for Non-KBK District Per PHM 3,12,552 3.13 0 0.00
Non KBK district - 2017-18 Base - Rs.19,845/- + Increment (5%) - Rs.992/- = Base
2018-19 @Rs.20,837/- + PI (Max 25%) - Rs.5209/- + KBK Rs. 1,000/- = Rs.26,046/-
p.m.
Budgeted 70%
Details at NUHM District Level HR annexure
U.8.1.9.1.2 P.4.1.9.2 UCHC 0.00 0.00
U.8.1.10 Support Staff for Health Facilities 0.00
U.8.1.9.1.1 P.4.1.9.1
Page 256 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.8.1.10.1 P.4.1.11 Other Support staffPer Support
Staff1,00,980 1.01 0 0.00
State govt has approved fund under state head for strengthening anciliary services
(housekeeping & cleaning, security and laundary services) for all institutions
including UPHCs & UCHCs. Hence, the existing support staffs will be resuffled to
manage existing requirement of newly created UPHCs/UCHCs
Budgeted 70%
Details at NUHM District Level HR annexure - Clinical HR (annex)
U.8.1.10.2 P.4.1.10 DEO cum Accountant Lumpsum - 0.00 1 0.00
Approval in 17-18 : 88 DAA for 12 months
Approved in 2018-19 : 97 DAA (88 DAA + 9 additional DAA)
a. 88 DAA (approved in 17-18) for 12 months
b. 4 for four new UPHCs for 9 months at Rourkela
c. 5 as per gap analysis for existing UPHCs for 9 months
Rationalisation of salary proposed at par with BDM
Remuneration: - 2017-18 Base - Rs.11,000/- (Base rationalized as per State decision)
+ Increment (5%) - Rs.550/- = Base 2018-19 @ Rs.11550/- + PI (Max 25%) - Rs.2888/-
= Rs.14438/- p.m.
Budgeted 70%
Details at NUHM District Level HR annexure - Clinical HR (annex)
U.8.2 Annual increment for all the existing positions - 0.00 0.00 Budget proposed under respective line item
U.8.3EPF (Employer's contribution) @ 13.36% for salaries <=
Rs.15,000 pmLumpsum 1,10,101.00 1.10 1 1.10 Details at EPF(annex)
U.8.4 Incentives/ Allowances/ Awards 0.00
U.8.4.1 0.00 0.00 Not proposed
U.9 Training & Capacity Building 0.18
U.9.1Setting Up & Strengthening of Skill Lab/ Other Training
Centres0.00
U.9.1.1 P.3.3 Support for Identified Training Institutions Per training
centre 50,00,000.00 50.00 0.00 Not Approved
U.9.1.2 Any Other 0.00 0.00 Not proposed
U.9.2 HR for Skill Lab/ Training Institutes
U.9.3 Training HR Increment
U.9.4 Training HR EPF
Page 257 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.9.5 Trainings 0.18
U.9.5.1 P.3.2.1 Training/ orientation of ANM and other paramedical staff - 0.00 0.00
1. Training under RMNCH+A - Budgeted under NHM (included in proposed training
load) :
1.1. For 12 functional Delivery Points in urban cities :
a. 21 days SAB training for SN & ANMs (SN-55, ANM-60)
b. 2 days NSSK training for SN & ANMs (SN-55, ANM-60)
c. Training of LT on RTI/STI (LT-15)
d. 4 days training of SN on facility based new born care (SN-55)
1.2. Other training - (for all UPHCs & UCHCs) -
a. 7 days multiskilling training of LT (LT-68)
b. District level orientation of ANM on MDSR and CDR (ANM-488)
c. 5 days Training of Staff Nurses & ANMs on IUCD at District level (SN-165, ANM-
530)
d. 1 day training for SNs & ANMs on injectable contraceptive (SN-165, ANM-530)
under newer contraceptives
e. 1 day training for SNs & ANMs on oral pills (SN-165, ANM-530) under newer
contraceptives
Training of service providers of UPHCs and UCHCs are proposed as the facilities are
attached to DHH and logistics are made available in the first phase.
(Trainings and handholding support at Puri, Berhampur, Rourkela and other
corporation cities to be facilitated by PSI under TCIHC intervention)
U.9.5.2 P.3.2.2 Training/ orientation of Medical Officers - 0.00 0.00
1. Training under RMNCH+A - Budgeted under NHM (included in proposed training
load)
1.1. For 12 functional Delivery Points in urban cities -
a. BeMOC training for MO
b. 2 days NSSK tarining for MOs
c. Training of MO on RTI/STI
1.2. Other training - (for all UPHCs & UCHCs) -
a. 2 day training for MOs on injectable Contraceptives and oral pills at District level
for all MOs
b. 5 days Training of MOs on IUCD at District level
Training of service providers of UPHCs and UCHCs are proposed as the facilities are
attached to DHH and logistics are made available in the first phase.
(Trainings and handholding support at Puri, Berhampur, Rourkela and other
corporation cities to be facilitated by PSI under TCIHC intervention)
U.9.5.3 P.3.2.3 Training/ Orientation of Specialists 0.00 0.00 Not proposed
Page 258 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.9.5.4 P.3.2.4 Training/ Orientation of RKS Per RKS 2,500.00 0.03 0 0.00Batch size: 10-12 members per RKS.
Unit cost @ Rs. 2,500/- per RKS
U.9.5.5 P.3.2.5 Training on Quality Assurance Per batch 147000 1.47 0 0.00Paticipants per UPHC - (3 participants – Doctor, Public Health Manager & Nurse)
Participants per UCHC - 5 participants
U.9.5.6 P.3.2.6Training on Other Disease control program if required (Please
specify )0.00 0.00 Not proposed
U.9.5.7 P.3.2.7 Training / orientation on HMIS/ICT 0.00 0.00
Other Trainings/Orientations (pls specify)
One day orientation of WKS at district/city level Per WKS 4,650.00 0.05 13 0.18
Three days refresher training for PMU staff on program
management & leadership at state levelPer batch 1,82,000.00 1.82 0 0.00
Three days training of Public Health Manager on health care
services delivery at state level Per batch 1,62,000.00 1.62 0 0.00
2 days refresher training of Data Assistant cum Accountant on
HMIS, RCH, accounting & book keeping, PFMS at state levelPer batch 1,82,000.00 1.82 0 0.00
One day state level training of program personnel on MDSR
and CDR (28 person) Budget proposed under NHM
Training of Medical Officers of HWC Per MO 10,000.00 0.10 0 0.00
Training of Staff Nurse of HWC Per SN 7,500.00 0.08 0 0.00
Training of MPW (F) of HWC Per MPW 5,000.00 0.05 0 0.00
Training Balance amount kept at State Lumpsum 0 0.00 1 0.00 Error on Calculation
U.10 Review, Research, Surveillance & Surveys 0.00
U.10.1 Reviews 0.00
U.10.1.1 Maternal Death Review (both in institutions and community) 0.00 0.00 Proposed under NHM
U.10.1.2 Child Death Review 0.00 0.00 Proposed under NHM
U.10.2 Research & Surveys 0.00
U.10.2.1 P.8.2 Research Studies Lumpsum 3,00,000.00 3.00 0.00 Not Approved
U.10.2.2 P.1.1.1/ P.1.2.1Mapping of slums and vulnerable population in Metro cities/
other cities & towns- 0.00 0.00 Proposed last year
U.10.2.3 Others 0.00 0.00
U.10.3 Surveillance
U.10.4 Other Recurring cost
U.11 IEC/ BCC 0.00 Mid year population (55.53 lakhs) @ Rs. 5 per person = Rs. 277.65 lakhs
U.9.5.8 P.3.2.8
Page 259 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.11.1 P.9.1 Print Media Lumpsum 41,64,900 41.65 0 0.00
U.11.2 P.9.2 Electronic Media Lumpsum 97,18,100 97.18 0 0.00
U.11.3 P.9.3 IPC Lumpsum 55,53,000 55.53 0 0.00 IPC will be conducted by utilising MAS and ASHA
U.11.4 P.9.4 Other Media Lumpsum 83,29,500 83.30 0 0.00
U.11.5 IEC/ BCC for UPHC level HWC Per UPHC 1,00,000.00 1.00 0 0.00
U.12 Printing 0.00
U.12.1 Printing activities Lumpsum 10,00,000.00 10.00 0 0.00 Printing of MAS register, WKS register & guidelines
U.13 Quality Assurance 0.00
U.13.1 Quality Assurance 0.00
Quality Assurance Implementation
Facility based QA Interventions Per Unit 50000 0.50 0 0.00
Facility based QA Interventions - Ongoing activity with revised unit cost & revised
unit nos.
a. Printing of satisfaction survey tools (Rs. 5,000/-)
b. Pest & termite control activities (Rs. 35,000/-),
c. Calibration of BP instrument, weighing machine, etc., (Rs. 10,000)
NQAS external assessment for State Certification Per Unit 69000 0.69 0 0.00NQAS external assessment for State Certification -
Budget proposed Rs. 69,000/- per facility (Fund parked at State Level )
NQAS external assessment for National Certification Per Unit 102000 1.02 0 0.00NQAS external assessment for National Certification
Budget proposed Rs. 1,02,000/- per facility (Fund Parked at State Level )
Incentive for NQAS accredited UPHCs (without bed) Per Unit 200000 2.00 0 0.00Incentive for NQAS accredited UPHCs (without bed) -
Budget proposed Rs. 2,00,000/- per facility (Fund parked at State Level)
U.13.2 Kayakalp 0.00
Support for Implementation of Kayakalp
Cost for Kayakalp external assessment Per Unit 10,000.00 0.10 0 0.00
Cost for Kayakalp external assessment-
Cost includes TA, DA & resource person fees of external assessors. Budget proposed -
Rs. 10,000/- per facility
Kayakalp award Lumpsum 14,50,000.00 14.50 0 0.00
Kayakalp award
Budget proposed -
Winner @ Rs. 2,00,000/-
1st runner up @ Rs.1,50,000/- for 1 UPHC
2nd runner up @ Rs. 1,00,000/- for 1 UPHC
Commendation award @ Rs. 50,000/- per facility
U.13.2.2 Swachh Swasth Sarvatra 0.00 0.00
U.13.3 Any Other 0.00 0.00
U.14 Drug Warehousing & Logistics 0.00
U.14.1 Drug Ware Housing (All operating costs including HR, etc.)
U.13.2.1
U.13.1.1
Page 260 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.14.2 Other Logistics 0.00
U.14.2.1 Logistic support for Urban Health Facilities Per unit 1,35,000.00 1.35 0 0.00
Proposal : Establishment of Sub store cum Drugs Distribution centre.
Cost proposed -
Infrastructure & raking = Rs. 1,35,000/-
Computer, printer & scanner = Rs. 55,000/- (proposed under U.16.7.1.1
Branding - From IEC/BCC cost
Cost proposed per unit - Rs. 1,35,000/-
U.15 PPP 0.00
U.15.1 0.00 0.00
On going PPP projects:
1. Urban MHU - Proposed under FMR code- U.2.1.1
2. UPHCs under PPP mode - HR, equipment, office expenses, mobility support, etc
are porposed under respective line items.
U.16 Programme Management 4.62
U.16.1 Planning Activities 0.00
U.16.1.1 City coordination committee Per City 9,000.00 0.09 0 0.00
City coordination committee meeting to be held every quarter for approval of city
plan, review of city level activities and expenditure in 9 cities having population more
than one lakh
Budget proposed for 3 quarters
Cost per meeting - Rs. 3,000/- per meeting per quarter
U.16.2 Monitoring & Data Management 0.00
U.16.2.1 P.5.1 QA committees at city level (meetings, workshops, etc.) Per meeting 500.00 0.01 0 0.00
a. Facility level QA committee meeting - 1 meeting per qtr @ Rs. 500/- per meeting -
b. City level performance assessment tool will be developed & piloted with the
technical supoport of PSI under TCIHC for assessing the performance & undertaking
corrective measures in targted cities (Puri, Berhampur & Rourkella)- No budget
proposed under NHM
U.16.2.2 P.5.2 Review meetings 0.00 0.00 Not proposed
U.16.3 Mobility Support 0.00
U.16.3.1 P.5.1 QA committees at city level (meetings, workshops, etc.) 0.00 0.00Budget not proposed as the amount to be met from PMU mobility cost / UPHC
mobility cost
U.16.4 Operational Cost 0.00
U.16.4.1 0.00 0.00
U.16.5 PC&PNDT Activities
U.16.6 HMIS & MCTS
U.16.7 Any Other PM Activities 0.00
U.16.7.1 P.8.3 ICT Initiatives 0.00
U.16.7.1.1 P.8.3.1 Hardware & Connectivity Per unit 55,000.00 0.55 0 0.00Approved for Establishment of Sub store cum Drugs Distribution centre.
Computer, printer & scanner for DDC @ Rs. 55,000/- per unit
U.16.7.1.2 P.8.3.2 Software 0.00 0.00 Proposed under NHM
Page 261 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
U.16.7.1.3 ICT for UPHC level HWC Per UPHC 1,00,000.00 1.00 0 0.00Approved for One laptop for MO UPHC & 4 tablet for MPW (F) @ Rs. 1.00 lakhs per
UPHC
U.16.8 Human Resources 4.62
U.16.8.1 P.2.1 State PMU 0.00
Human Resources Details at State Level HR Annexure
Programme Manager-UH Per person/
Per Month72,786 0.73 0 0.00
Accounts Manager-UH Per person/
Per Month63,670 0.64 0 0.00
Data Manager-UH Per person/
Per Month63,670 0.64 0 0.00
Convergence & Community Process Manager-UH Per person/
Per Month63,670 0.64 0 0.00
Programme Associate-UH Per person/
Per Month40,951 0.41 0 0.00
Programme Assistant-UH Per person/
Per Month32,414 0.32 0 0.00
U.16.8.1.2 P.2.1.2 Mobility support per annum 11,00,000.00 11.00 0 0.00
Administrative expenses (including Review meetings,
workshops, etc.)
Office expenses Lumpsum 5,00,000.00 5.00 0 0.00
Review Meeting Lumpsum 2,00,000.00 2.00 0 0.00
Independent Monitoring for performance assessment of
UPHC level HWCPer UPHC 45,000.00 0.45 0 0.00
Approved for Independent Monitoring for performance assessment @3% to a
lumpsum amount 0.45 lakhs for HWC
U.16.8.1.4 P.2.1.4 Salaries for staff on deputation Lumpsum 8,65,821.60 8.66 0 0.00Remuneration of Additional Mission Director (on deputation) proposed as per actual
Details in NUHM Budget annexure - Prog Management HR (Annx)
U.16.8.1.5 P.2.1.5 Any Other 0.00 0.00 Not proposed
U.16.8.2 P.2.2 District PMU 4.62
Human Resources Details at District level HR Annexure
Asst Program Manager-UH at KBK districtPer person/
Per Month42,751 0.43 1 3.59
Asst Program Manager-UH at Non KBK districtPer person/
Per Month40,951 0.41 0 0.00
U.16.8.2.2 P.2.2.2 Mobility support per annum 36,000.00 0.36 1 0.36 Rs. 3000/- per month including TA/DA
U.16.8.2.3 P.2.2.3Administrative expenses (including Review meetings,
workshops, etc.)per annum 66,600.00 0.67 1 0.67
Office expenses includes stationery, contigency, meeting, telephone , CUG expenses -
Rs. 66,600/- per DPMU per annum
Total budget proposed - Rs. 66,600/-
U.16.8.2.4 P.2.2.4 Any Other 0.00 0.00
U.16.8.3 P.2.3 City PMU 0.00
Human Resources Details at District level HR Annexure
City Programme Manager Per person/
Per Month50,068 0.50 0 0.00
U.16.8.1.1 P.2.1.1
U.16.8.1.3 P.2.1.3
U.16.8.2.1 P.2.2.1
U.16.8.3.1 P.2.3.1
Page 262 of 280
Phulabani_NUHM
New FMR Old FMR ParticularsUnit of
Measure
Unit Cost
(Rs)
Unit Cost
(Rs. Lakhs)
Quantity/
Target
Budget
(Rs. Lakhs)State Remarks
City Accounts Manager Per person/
Per Month40,951 0.41 0 0.00
City Data Manager Lumpsum - 0.00 1 0.00
Asst. Programme Manager- Urban HealthPer person/
Per Month40,952 0.41 0 0.00
Programme Assistant Per person/
Per Month27,349 0.27 0 0.00
DEO (Base rationalised as per state's decision) Per person/
Per Month17,365 0.17 0 0.00
U.16.8.3.2 P.2.3.2 Mobility support per annum 3,00,000.00 3.00 0 0.00
U.16.8.3.3 P.2.3.3Administrative expenses (including Review meetings,
workshops, etc.)per annum 3,92,880.00 3.93 0 0.00
U.16.8.3.4 P.2.3.4 Any Other 0.00 0.00 Not proposed
U.16.8.4 PM HR Increment 0.00 0.00 Budget proposed under respective line item
U.16.8.5 PM HR EPF Lumpsum - 0.00 1 0.00 Details at EPF(annex)
U.17 IT Support 0.00
Mission Connect Per month 225.00 0.00 0 0.00
IT Support to UPHCs level HWC Per UPHC 10,000.00 0.10 0 0.00 Approved for IT support to UPHCs Rs.10000/- per HWCs
U.18 Innovations 0.12
Innovations 0.12
Comprehensive service package for UPHCs - AMA clinicPer UPHC 83160 0.8316 0 0.000
Expansion of ILR point Per unit 200000 2.00 0.00
Hired vaccinator for high rising building in Bhubaneswar
Municipal Corporation
MAS Convention Lumpsum 1058000 10.58 0 0.00
Award to better performing MAS Per MAS 3000 0.03 4 0.12
Sanitary napkin for urban Adolescent girls Per napkin 1.33 0.000013 0 0.00
14.56
U.118.1
Total
U.16.8.3.1 P.2.3.1
U.17.1
Page 263 of 280
Operating Expenses Annex
12 9 months 12 Months 9 months 12 Months 9 months 12 Months 9 months 12 9 months 12 Months 9 months1 Angul Angul 0 0 0 0 0 0 0 0 0 02 Balasore Balasore 2 1 48000 18000 2 1 120000 45000 1 1 175000 131250 2 2700003 Bargarh Bargarh 2 0 48000 0 2 0 120000 0 1 175000 0 1 1350004 Bhadrak Bhadrak 1 1 24000 18000 1 1 60000 45000 0 0 1 1350005 Bolangir Bolangir 2 0 48000 0 2 0 120000 0 2 350000 0 2 2700006 Cuttack Cuttack CHS 13 0 312000 0 13 0 780000 0 4 700000 0 4 7200007 Cuttack Choudwar 1 0 24000 0 1 0 60000 0 1 175000 0 1 1350008 Dhenkanal Dhenkanal 1 0 24000 0 1 0 60000 0 0 09 Gajapati Paralakhemundi 1 0 24000 0 1 0 60000 0 0 0
10 Ganjam Berhampur CHS 7 0 168000 0 7 0 420000 0 5 875000 0 4 72000011 Jagatsinghpur Paradeep 1 0 24000 0 1 0 60000 0 0 012 Jagatsinghpur Jagatsinghpur 0 0 0 0 0 0 0 0 0 013 Jajpur Byasanagar 1 0 24000 0 1 0 60000 0 0 014 Jajpur Jajpur 0 0 0 0 0 0 0 0 0 015 Jharsugada Jharsugada 1 1 24000 18000 1 1 60000 45000 0 1 0 131250 1 13500016 Jharsugada Brajarajnagar 2 0 48000 0 2 0 120000 0 0 0 0 1 13500017 Kalahandi Bhawanipatna 1 0 24000 0 1 0 60000 0 1 175000 0 1 13500018 Kandhamal Phulabani 0 0 0 0 0 0 0 0 0 019 Kendrapara Kendrapara 0 0 0 0 0 0 0 0 0 020 Keonjhar Keonjhar 1 0 24000 0 1 0 60000 0 0 021 Keonjhar Barbil 1 0 24000 0 1 0 60000 0 0 022 Khordha Bhubaneswar CHS 22 0 528000 0 22 0 1320000 0 4 700000 0 3 67500023 Khordha Jatani 1 1 24000 18000 1 1 60000 45000 1 0 13125024 Khordha Khordha 1 0 24000 0 1 0 60000 0 0 025 Koraput Jeypore 1 1 24000 18000 1 1 60000 45000 1 1 175000 131250 1 13500026 Koraput Sunabeda 1 0 24000 0 1 0 60000 0 0 027 Koraput Koraput 0 1 0 18000 0 1 0 45000 1 0 131250 1 13500028 Malkangiri Malkangiri 0 0 0 0 0 0 0 0 0 029 Mayurbhanj Baripada 2 0 48000 0 2 0 120000 0 1 175000 0 1 13500030 Nawarangpur Nawarangpur 0 0 0 0 0 0 0 0 0 031 Puri Puri 4 1 96000 18000 4 1 240000 45000 1 0 13125032 Rayagada Rayagada 1 0 24000 0 1 0 60000 0 0 033 Sambalpur Sambalpur CHS 8 0 192000 0 8 0 480000 0 0 034 Sundagarhh Rourkela CHS 5 5 120000 90000 5 5 300000 225000 1 5 175000 656250 1 18000035 Sundagarhh Rajgangpur 1 0 24000 0 1 0 60000 0 0 036 Sundagarhh Sundargarh 0 0 0 0 0 0 0 0 0 037 State State 0 0 0 0 0 0 0 0 3 1 525000 131250
85 12 2040000 216000 85 12 5100000 540000 25 12 4375000 1575000 25 4050000Total
Rent for UPHCs (for 9 months
@25000/- for Bhubaneswar CHS,
@ 20000/- for other 3 CHS &
@15000 for non corporation
cities)
Operational Expenses UPHCs (U.1.3.1)
Sl. NoName of the
DistrictName of the City
Mobility support for UPHCs @Rs.2000/- Per
month
Office expenses for UPHCs @Rs.5000/- Per
month
Management cost to NGO/MC @Rs.43750
per quarter
Physical Target Financial Target Physical Target Financial Target Physical Target Financial TargetPhysical Target Financial Target
Page 264 of 280
MHU(Annex)
Sl No ParticularsCost Estimate
(Monthly )
Cost Estimate (For 12
Months)
(Rs.)
Remarks
I Manpower cost Budgeted 71%
1 Medical Officer (AYUSH) 27,405 2,35,099Base @Rs.20,880/- + Increment (5%) @ Rs. 1,044/- + PI (25%) @Rs.5,481/- = Rs.27,405/- p.m.
The salary has been proposed at par with other clinical staffs under NHM
2 Pharmacist 14,453 1,23,988Base @Rs.11011/- + Increment (5%) @ Rs. 551/- + PI (25%) @Rs.2,891/- = Rs.14453/- p.m.
The salary has been proposed at par with other clinical staffs under NHM
3 ANM 13,970 1,19,844Base @Rs.10644/- + Increment (5%) @ Rs. 532/- + PI (25% max) @Rs.2794/- = Rs.13970/- p.m.
The salary has been proposed at par with other clinical staffs under NHM
4 Attendant 0 0
Sub Total 55,828 4,78,931
II Transportation cost
1 Hiring of vehicle (four wheeler) 18,000 2,16,000
2 POL/DOL 8,000 96,000
Sub Total 26,000 3,12,000
III Medicine cost 0 Medicines to be replenished from concerned UPHCs
IV Sub Total (I+II+III) 81,828 7,90,931
V
Administrative cost to NGO (Management through
PPP mode for documentation, report returns and
other miscellaneous expenditure) @ 5% of HR &
Transportation cost
4,091 49,097
85,919 8,40,027
Note: MHU proposed - Bhubaneswar - 4, Cuttack-1, Rourkela - 1, Berhampur-1, Sambalpur-1, Jatani & Khordha - 1
Annexure - MHU (U.2.1.1)
Grand Total (IV+V)
Page 265 of 280
Consumables UPHC & UCHC Annex
12 Months 9 months 12 Months 9 months
1 Angul Angul 0 0 0 0 0 0 0
2 Balasore Balasore 2 0 48000 0 0 2 100000
3 Bargarh Bargarh 2 0 48000 0 0 2 100000
4 Bhadrak Bhadrak 1 0 24000 0 0 1 50000
5 Bolangir Bolangir 2 0 48000 0 0 2 100000
6 Cuttack Cuttack CHS 13 2 312000 36000 2 120000 13 650000
7 Cuttack Choudwar 1 1 24000 18000 0 1 50000
8 Dhenkanal Dhenkanal 1 0 24000 0 0 1 50000
9 Gajapati Paralakhemundi 1 0 24000 0 0 1 50000
10 Ganjam Berhampur CHS 7 1 168000 18000 0 7 350000
11 Jagatsinghpur Paradeep 1 0 24000 0 0 1 50000
12 Jagatsinghpur Jagatsinghpur 0 0 0 0 0 0 0
13 Jajpur Byasanagar 1 0 24000 0 0 1 50000
14 Jajpur Jajpur 0 0 0 0 0 0 0
15 Jharsugada Jharsugada 1 0 24000 0 0 1 50000
16 Jharsugada Brajarajnagar 2 0 48000 0 0 2 100000
17 Kalahandi Bhawanipatna 1 0 24000 0 0 1 50000
18 Kandhamal Phulabani 0 0 0 0 0 0 0
19 Kendrapara Kendrapara 0 0 0 0 0 0 0
20 Keonjhar Keonjhar 1 0 24000 0 0 1 50000
21 Keonjhar Barbil 1 0 24000 0 0 1 50000
22 Khordha Bhubaneswar CHS 22 4 528000 72000 4 240000 22 1100000
23 Khordha Jatani 1 0 24000 0 0 1 50000
24 Khordha Khordha 1 0 24000 0 0 1 50000
25 Koraput Jeypore 1 0 24000 0 0 1 50000
26 Koraput Sunabeda 1 0 24000 0 0 1 50000
27 Koraput Koraput 0 0 0 0 0 0 0
28 Malkangiri Malkangiri 0 0 0 0 0 0 0
29 Mayurbhanj Baripada 2 0 48000 0 0 2 100000
30 Nawarangpur Nawarangpur 0 0 0 0 0 0 0
31 Puri Puri 4 0 96000 0 0 4 200000
32 Rayagada Rayagada 1 0 24000 0 0 1 50000
33 Sambalpur Sambalpur CHS 8 1 192000 18000 0 8 400000
34 Sundagarhh Rourkela CHS 5 3 120000 54000 1 60000 5 250000
35 Sundagarhh Rajgangpur 1 0 24000 0 0 1 50000
36 Sundagarhh Sundargarh 0 0 0 0 0 0 0
37 State State 0 0 0 0 0 0 0
85 12 2040000 216000 7 420000 85 4250000
Consumables for UPHCs & UCHCs (U.6.1.4)
Consumables for UCHC for 12 months
Physical Target Financial TargetSl. No Name of the District Name of the City Physical Target
Total
Financial Target
Consumables for UPHC
Physical Target Financial Target
Consumables for Lab at UPHC level HWC
Page 266 of 280
City Level Clinical HR Annex
No of
Existing
Position
Base
2017-18
Increment
(5%)
Revised
Base
2018-19
PI
Maximum
25%
Total
Per
Month
Total
(in lakhs)
Budget
Approve
d 70%
No of
Existing
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximum
25%
Total Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
1 Angul Angul 3 10644 532 11176 2794 13970 5.03 3.52 13678 684 14362 3591 17953 0.00 0.002 Balasore Balasore 14 10644 532 11176 2794 13970 23.47 16.43 4 13678 684 14362 3591 17953 8.62 6.03
3 Bargarh Bargarh 8 10644 532 11176 2794 13970 13.41 9.39 4 13678 684 14362 3591 17953 8.62 6.034 Bhadrak Bhadrak 12 10644 532 11176 2794 13970 20.12 14.08 2 13678 684 14362 3591 17953 4.31 3.02
5 Bolangir Bolangir 6 10644 532 11176 2794 13970 10.06 7.04 4 13678 684 14362 3591 17953 8.62 6.036 Cuttack Cuttack CHS 41 10644 532 11176 2794 13970 68.73 48.11 26 13678 684 14362 3591 17953 56.01 39.217 Cuttack Choudwar 5 10644 532 11176 2794 13970 8.38 5.87 2 13678 684 14362 3591 17953 4.31 3.02
8 Dhenkanal Dhenkanal 4 10644 532 11176 2794 13970 6.71 4.69 2 13678 684 14362 3591 17953 4.31 3.029 Gajapati Paralakhemundi 5 10644 532 11176 2794 13970 8.38 5.87 2 13678 684 14362 3591 17953 4.31 3.02
10 Ganjam Berhampur CHS 37 10644 532 11176 2794 13970 62.03 43.42 14 13678 684 14362 3591 17953 30.16 21.1111 Jagatsinghpur Paradeep 6 10644 532 11176 2794 13970 10.06 7.04 13678 684 14362 3591 17953 0.00 0.0012 Jagatsinghpur Jagatsinghpur 2 10644 532 11176 2794 13970 3.35 2.35 13678 684 14362 3591 17953 0.00 0.00
13 Jajpur Byasanagar 0 10644 532 11176 2794 13970 0.00 0.00 13678 684 14362 3591 17953 0.00 0.0014 Jajpur Jajpur 4 10644 532 11176 2794 13970 6.71 4.69 13678 684 14362 3591 17953 0.00 0.00
15 Jharsugada Jharsugada 5 10644 532 11176 2794 13970 8.38 5.87 2 13678 684 14362 3591 17953 4.31 3.0216 Jharsugada Brajarajnagar 3 10644 532 11176 2794 13970 5.03 3.52 2 13678 684 14362 3591 17953 4.31 3.0217 Kalahandi Bhawanipatna 7 10644 532 11176 2794 13970 11.73 8.21 2 13678 684 14362 3591 17953 4.31 3.02
18 Kandhamal Phulabani 4 10644 532 11176 2794 13970 6.71 4.69 13678 684 14362 3591 17953 0.00 0.0019 Kendrapara Kendrapara 3 10644 532 11176 2794 13970 5.03 3.52 13678 684 14362 3591 17953 0.00 0.00
20 Keonjhar Keonjhar 6 10644 532 11176 2794 13970 10.06 7.04 2 13678 684 14362 3591 17953 4.31 3.02
21 Keonjhar Barbil 5 10644 532 11176 2794 13970 8.38 5.87 13678 684 14362 3591 17953 0.00 0.00
22 Khordha Bhubaneswar CHS 50 10644 532 11176 2794 13970 83.82 58.67 44 13678 684 14362 3591 17953 94.79 66.3523 Khordha Jatani 5 10644 532 11176 2794 13970 8.38 5.87 13678 684 14362 3591 17953 0.00 0.0024 Khordha Khordha 4 10644 532 11176 2794 13970 6.71 4.69 2 13678 684 14362 3591 17953 4.31 3.02
25 Koraput Jeypore 6 10644 532 11176 2794 13970 10.06 7.04 4 13678 684 14362 3591 17953 8.62 6.03
26 Koraput Sunabeda 4 10644 532 11176 2794 13970 6.71 4.69 13678 684 14362 3591 17953 0.00 0.0027 Koraput Koraput 3 10644 532 11176 2794 13970 5.03 3.52 2 13678 684 14362 3591 17953 4.31 3.0228 Malkangiri Malkangiri 1 10644 532 11176 2794 13970 1.68 1.17 13678 684 14362 3591 17953 0.00 0.0029 Mayurbhanj Baripada 5 10644 532 11176 2794 13970 8.38 5.87 4 13678 684 14362 3591 17953 8.62 6.03
30 Nawarangpur Nawarangpur 4 10644 532 11176 2794 13970 6.71 4.69 13678 684 14362 3591 17953 0.00 0.00
31 Puri Puri 15 10644 532 11176 2794 13970 25.15 17.60 5 13678 684 14362 3591 17953 10.77 7.54
32 Rayagada Rayagada 7 10644 532 11176 2794 13970 11.73 8.21 2 13678 684 14362 3591 17953 4.31 3.02
33 Sambalpur Sambalpur CHS 26 10644 532 11176 2794 13970 43.59 30.51 12 13678 684 14362 3591 17953 25.85 18.1034 Sundagarhh Rourkela CHS 30 10644 532 11176 2794 13970 50.29 35.20 18 13678 684 14362 3591 17953 38.78 27.1435 Sundagarhh Rajgangpur 4 10644 532 11176 2794 13970 6.71 4.69 13678 684 14362 3591 17953 0.00 0.0036 Sundagarhh Sundargarh 3 10644 532 11176 2794 13970 5.03 3.52 13678 684 14362 3591 17953 0.00 0.0037 State State 0 0
347 581.71 407.20 161 346.85 242.80
Name of the City
ANM (U.8.1.1.1)
City wise Clinical HR Annexure
Name of the position
Total
SN- UPHC (U.8.1.2.1)
Sl. NoName of the
District
Page 267 of 280
City Level Clinical HR Annex
1 Angul Angul2 Balasore Balasore
3 Bargarh Bargarh4 Bhadrak Bhadrak
5 Bolangir Bolangir6 Cuttack Cuttack CHS7 Cuttack Choudwar
8 Dhenkanal Dhenkanal9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS11 Jagatsinghpur Paradeep12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar14 Jajpur Jajpur
15 Jharsugada Jharsugada16 Jharsugada Brajarajnagar17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS23 Khordha Jatani24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda27 Koraput Koraput28 Malkangiri Malkangiri29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS34 Sundagarhh Rourkela CHS35 Sundagarhh Rajgangpur36 Sundagarhh Sundargarh37 State State
Name of the City
City wise Clinical HR Annexure
Total
Sl. NoName of the
DistrictNo of
Existing
Position
Base
2017-18
Increment
(5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
No of
Existing
Position
No of
New
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximum
25%
Total
Per
Month
Total
(in lakhs)
Budget
Approve
d 70%
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 3 11011 551 11562 2891 14453 5.20 3.64
13678 684 14362 3591 17953 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.4313678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.434 13678 684 14362 3591 17953 8.62 6.03 13 11011 551 11562 2891 14453 22.55 15.78
13678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2113678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 7 11011 551 11562 2891 14453 12.14 8.5013678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
13678 684 14362 3591 17953 0.00 0.00 1 1 11011 551 11562 2891 14453 3.04 2.1213678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2113678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
13678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
13 13678 684 14362 3591 17953 28.01 19.60 22 11011 551 11562 2891 14453 38.16 26.7113678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2113678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.30 0.91
13678 684 14362 3591 17953 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.43
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2113678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.43
13678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
13678 684 14362 3591 17953 0.00 0.00 2 1 11011 551 11562 2891 14453 4.77 3.34
13678 684 14362 3591 17953 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
13678 684 14362 3591 17953 0.00 0.00 7 11011 551 11562 2891 14453 12.14 8.5013678 684 14362 3591 17953 0.00 0.00 9 1 11011 551 11562 2891 14453 16.91 11.8413678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0013678 684 14362 3591 17953 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
0 017 36.62 25.64 82 4 147.42 103.19
SN- UCHC (U.8.1.2.2) LT- UPHC (U.8.1.3.1)
Page 268 of 280
City Level Clinical HR Annex
1 Angul Angul2 Balasore Balasore
3 Bargarh Bargarh4 Bhadrak Bhadrak
5 Bolangir Bolangir6 Cuttack Cuttack CHS7 Cuttack Choudwar
8 Dhenkanal Dhenkanal9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS11 Jagatsinghpur Paradeep12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar14 Jajpur Jajpur
15 Jharsugada Jharsugada16 Jharsugada Brajarajnagar17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS23 Khordha Jatani24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda27 Koraput Koraput28 Malkangiri Malkangiri29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS34 Sundagarhh Rourkela CHS35 Sundagarhh Rajgangpur36 Sundagarhh Sundargarh37 State State
Name of the City
City wise Clinical HR Annexure
Total
Sl. NoName of the
DistrictNo of
Existing
Position
Base
2017-18
Incremen
t (5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total Per
Month
Total
(in
lakhs)
Budget
Approved
70%
No of
Existing
Position
No of
New
Position
Base
2017-18
Incremen
t (5%)
Revised
Base
2018-19
PI
Maximum
25%
Total
Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.43
11011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.4311011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
11011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.432 11011 551 11562 2891 14453 3.47 2.43 6 11011 551 11562 2891 14453 10.41 7.28
11011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
11011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2111011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 6 11011 551 11562 2891 14453 10.41 7.2811011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 1 1 11011 551 11562 2891 14453 3.04 2.1211011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2111011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
4 11011 551 11562 2891 14453 6.94 4.86 6 11011 551 11562 2891 14453 10.41 7.2811011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 0 1 11011 551 11562 2891 14453 1.30 0.91
11011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.43
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.2111011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.43
11011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
11011 551 11562 2891 14453 0.00 0.00 0 1 11011 551 11562 2891 14453 1.30 0.91
11011 551 11562 2891 14453 0.00 0.00 1 11011 551 11562 2891 14453 1.73 1.21
11011 551 11562 2891 14453 0.00 0.00 2 11011 551 11562 2891 14453 3.47 2.4311011 551 11562 2891 14453 0.00 0.00 9 1 11011 551 11562 2891 14453 16.91 11.8411011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.0011011 551 11562 2891 14453 0.00 0.00 11011 551 11562 2891 14453 0.00 0.00
0 06 10.41 7.28 47 4 86.72 60.70
Pharmacists- UPHC (U.8.1.4.1)LT- UCHC (U.8.1.3.1)
Page 269 of 280
City Level Clinical HR Annex
1 Angul Angul2 Balasore Balasore
3 Bargarh Bargarh4 Bhadrak Bhadrak
5 Bolangir Bolangir6 Cuttack Cuttack CHS7 Cuttack Choudwar
8 Dhenkanal Dhenkanal9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS11 Jagatsinghpur Paradeep12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar14 Jajpur Jajpur
15 Jharsugada Jharsugada16 Jharsugada Brajarajnagar17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS23 Khordha Jatani24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda27 Koraput Koraput28 Malkangiri Malkangiri29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS34 Sundagarhh Rourkela CHS35 Sundagarhh Rajgangpur36 Sundagarhh Sundargarh37 State State
Name of the City
City wise Clinical HR Annexure
Total
Sl. NoName of the
DistrictNo of
Existing
Position
Base
2017-18
Incremen
t (5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total
Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
No of
Existing
Position
No of
New
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximum
25%
KBK
Incentive
Total
Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
0.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 2 50400 2520 52920 13230 66150 15.88 11.11
0.00 0.00 2 50400 2520 52920 13230 66150 15.88 11.110.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.56
0.00 0.00 2 50400 2520 52920 13230 10000 76150 18.28 12.792 11011 551 11562 2891 14453 3.47 2.43 6 50400 2520 52920 13230 66150 47.63 33.34
0.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.56
0.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.560.00 0.00 1 50400 2520 52920 13230 10000 76150 9.14 6.40
0.00 0.00 6 50400 2520 52920 13230 66150 47.63 33.340.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 50400 2520 52920 13230 66150 0.00 0.00
0.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 50400 2520 52920 13230 66150 0.00 0.00
0.00 0.00 1 1 50400 2520 52920 13230 66150 13.89 9.720.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.560.00 0.00 1 50400 2520 52920 13230 10000 76150 9.14 6.40
0.00 0.00 50400 2520 52920 13230 10000 76150 0.00 0.000.00 0.00 50400 2520 52920 13230 66150 0.00 0.00
0.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.56
0.00 0.00 50400 2520 52920 13230 66150 0.00 0.00
0.00 0.00 12 50400 2520 52920 13230 66150 95.26 66.680.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 1 50400 2520 52920 13230 66150 5.95 4.17
0.00 0.00 2 50400 2520 52920 13230 10000 76150 18.28 12.79
0.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 1 50400 2520 52920 13230 10000 76150 9.14 6.400.00 0.00 50400 2520 52920 13230 10000 76150 0.00 0.000.00 0.00 1 50400 2520 52920 13230 66150 7.94 5.56
0.00 0.00 50400 2520 52920 13230 10000 76150 0.00 0.00
0.00 0.00 2 1 50400 2520 52920 13230 66150 21.83 15.28
0.00 0.00 1 50400 2520 52920 13230 10000 76150 9.14 6.40
0.00 0.00 4 50400 2520 52920 13230 66150 31.75 22.230.00 0.00 7 1 50400 2520 52920 13230 66150 61.52 43.060.00 0.00 50400 2520 52920 13230 66150 0.00 0.000.00 0.00 50400 2520 52920 13230 66150 0.00 0.00
0 02 3.47 2.43 56 4 477.94 334.56
Pharmacists- UCHC (U.8.1.4.2) Medical Officer UPHC- Full Time (U.8.1.8.1.1)
Page 270 of 280
City Level Clinical HR Annex
1 Angul Angul2 Balasore Balasore
3 Bargarh Bargarh4 Bhadrak Bhadrak
5 Bolangir Bolangir6 Cuttack Cuttack CHS7 Cuttack Choudwar
8 Dhenkanal Dhenkanal9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS11 Jagatsinghpur Paradeep12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar14 Jajpur Jajpur
15 Jharsugada Jharsugada16 Jharsugada Brajarajnagar17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS23 Khordha Jatani24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda27 Koraput Koraput28 Malkangiri Malkangiri29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS34 Sundagarhh Rourkela CHS35 Sundagarhh Rajgangpur36 Sundagarhh Sundargarh37 State State
Name of the City
City wise Clinical HR Annexure
Total
Sl. NoName of the
DistrictNo of
Existing
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximum
25%
KBK
Incentiv
e
Total Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
No of
Existing
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximu
m 25%
KBK
Incentiv
e
Total
Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 10000 76150 0.00 0.002 50400 2520 52920 13230 66150 15.88 11.11
50400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 10000 76150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 10000 76150 0.00 0.00
50400 2520 52920 13230 10000 76150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.00
1 50400 2520 52920 13230 66150 7.94 5.56 1 63000 3150 66150 16538 82688 9.92 6.9550400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 10000 76150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 10000 76150 0.00 0.0050400 2520 52920 13230 10000 76150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 10000 76150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.00
50400 2520 52920 13230 10000 76150 0.00 0.00
50400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.0050400 2520 52920 13230 66150 0.00 0.00
0 03 23.81 16.67 1 9.92 6.95
Medical Officer UCHC- Full Time (U.8.1.8.3.1) Paediatrician (U.8.1.6.2)
Page 271 of 280
City Level Clinical HR Annex
1 Angul Angul2 Balasore Balasore
3 Bargarh Bargarh4 Bhadrak Bhadrak
5 Bolangir Bolangir6 Cuttack Cuttack CHS7 Cuttack Choudwar
8 Dhenkanal Dhenkanal9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS11 Jagatsinghpur Paradeep12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar14 Jajpur Jajpur
15 Jharsugada Jharsugada16 Jharsugada Brajarajnagar17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS23 Khordha Jatani24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda27 Koraput Koraput28 Malkangiri Malkangiri29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS34 Sundagarhh Rourkela CHS35 Sundagarhh Rajgangpur36 Sundagarhh Sundargarh37 State State
Name of the City
City wise Clinical HR Annexure
Total
Sl. NoName of the
District No of Existing
Position
Base
2017-18Increment (5%)
Revised Base
2018-19PI Maximum 25% KBK Incentive Total Per Month
Total
(in lakhs)
Budget Approved
70%
1 63000 3150 66150 16538 82688 9.92 6.95
01 9.92 6.95
Other Specialists (U.8.1.6.7)
Page 272 of 280
Part Time MO Annex
12 Months 9 months 12 Months 9 months
1 Angul Angul 0 0 0 0 0
2 Balasore Balasore 2 0 604800 0
3 Bargarh Bargarh 2 0 604800 0
4 Bhadrak Bhadrak 1 0 302400 0
5 Bolangir Bolangir 2 0 604800 0
6 Cuttack Cuttack CHS 13 2 3931200 453600 2 864000
7 Cuttack Choudwar 1 1 302400 226800
8 Dhenkanal Dhenkanal 1 0 302400 0
9 Gajapati Paralakhemundi 1 0 302400 0
10 Ganjam Berhampur CHS 7 1 2116800 226800
11 Jagatsinghpur Paradeep 1 0 302400 0
12 Jagatsinghpur Jagatsinghpur 0 0 0 0
13 Jajpur Byasanagar 1 0 302400 0
14 Jajpur Jajpur 0 0 0 0
15 Jharsugada Jharsugada 1 0 302400 0
16 Jharsugada Brajarajnagar 2 0 604800 0
17 Kalahandi Bhawanipatna 1 0 302400 0
18 Kandhamal Phulabani 0 0 0 0
19 Kendrapara Kendrapara 0 0 0 0
20 Keonjhar Keonjhar 1 0 302400 0
21 Keonjhar Barbil 1 0 302400 0
22 Khordha Bhubaneswar CHS 22 4 6652800 907200 3 1296000
23 Khordha Jatani 1 0 302400 0
24 Khordha Khordha 1 0 302400 0
25 Koraput Jeypore 1 0 302400 0
26 Koraput Sunabeda 1 0 302400 0
27 Koraput Koraput 0 0 0 0
28 Malkangiri Malkangiri 0 0 0 0
29 Mayurbhanj Baripada 2 0 604800 0
30 Nawarangpur Nawarangpur 0 0 0 0
31 Puri Puri 4 0 1209600 0
32 Rayagada Rayagada 1 0 302400 0
33 Sambalpur Sambalpur CHS 8 1 2419200 226800
34 Sundagarhh Rourkela CHS 5 3 1512000 680400
35 Sundagarhh Rajgangpur 1 0 302400 0
36 Sundagarhh Sundargarh 0 0 0 0
37 State State 0 0 0 0
85 12 25704000 2721600 5 2160000
Part Time Medical Officer Annexure
Physical Target Financial Target
Total
Physical Target Financial Target
MO at UPHC (U.8.1.8.1.2) MO at UCHC (U.8.1.8.3.2)
Sl. No Name of the District Name of the City
Page 273 of 280
State Level HR Annex
Existing New * Total
Base
Remuneration per
month
Increment
@ 5%
Revised base
remuneration
KBK
Incentive
PI @ 25%
(max) on
revised base
Total amount
per annum
(Rs.)
Budgeted 70%
(Rs.)
P.2.1.4 U.16.8.1.4 Addl. Mission Director 1 1 - - 1,03,074 - - 12,36,888 8,65,822
Programme Manager-UH 1 1 55,456 2,773 58,229 - 14,557 8,73,432 6,11,402
Accounts Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Data Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Convergence & Community Process
Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Programme Associate-UH 1 1 31,201 1,560 32,761 - 8,190 4,91,412 3,43,988
Programme Assistant-UH 1 1 24,696 1,235 25,931 - 6,483 3,88,968 2,72,278
36,97,974
P.2.1.1 U.16.8.1.1
Total
PROGRAM MANAGEMENT HR (U.16.8.1.1)
Old FMR
code
New FMR
codeName of the position
Position Remuneration 2018-19
Page 274 of 280
District Level HR Annex
No of
Existing
Position
Base
2017-18
Incremen
t (5%)
Revised
Base
2018-19
PI
Maximum
25%
KBK
Incentive
Total Per
Month
Total
(in lakhs)
Budget
Approved
70%
No of
Existing
Position
Base
2017-18
Increme
nt (5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total
Per
Month
Total
(in
lakhs)
Budget
Approve
d 70%
1 Angul Angul 1 31201 1560 32761 8190 40951 4.91 3.44
2 Balasore Balasore 1 31201 1560 32761 8190 40951 4.91 3.44
3 Bargarh Bargarh 1 31201 1560 32761 8190 40951 4.91 3.44
4 Bhadrak Bhadrak 1 31201 1560 32761 8190 40951 4.91 3.44
5 Bolangir Bolangir 1 31201 1560 32761 8190 1800 42751 5.13 3.59
6 Cuttack Cuttack CHS 1 31201 1560 32761 8190 40951 4.91 3.44 1 38147 1907 40054 10014 50068 6.01 4.21
7 Cuttack Choudwar 1 31201 1560 32761 8190 40951 4.91 3.44
8 Dhenkanal Dhenkanal 1 31201 1560 32761 8190 40951 4.91 3.44
9 Gajapati Paralakhemundi 1 31201 1560 32761 8190 1800 42751 5.13 3.59
10 Ganjam Berhampur CHS 1 31201 1560 32761 8190 40951 4.91 3.44 1 38147 1907 40054 10014 50068 6.01 4.21
11 Jagatsinghpur Paradeep 31201 1560 32761 8190 40951 0.00 0.00
12 Jagatsinghpur Jagatsinghpur 1 31201 1560 32761 8190 40951 4.91 3.44
13 Jajpur Byasanagar 31201 1560 32761 8190 40951 0.00 0.00
14 Jajpur Jajpur 1 31201 1560 32761 8190 40951 4.91 3.44
15 Jharsugada Jharsugada 1 31201 1560 32761 8190 40951 4.91 3.44
16 Jharsugada Brajarajnagar 31201 1560 32761 8190 40951 0.00 0.00
17 Kalahandi Bhawanipatna 1 31201 1560 32761 8190 1800 42751 5.13 3.59
18 Kandhamal Phulabani 1 31201 1560 32761 8190 1800 42751 5.13 3.59
19 Kendrapara Kendrapara 1 31201 1560 32761 8190 40951 4.91 3.44
20 Keonjhar Keonjhar 1 31201 1560 32761 8190 40951 4.91 3.44
21 Keonjhar Barbil 31201 1560 32761 8190 40951 0.00 0.00
22 Khordha Bhubaneswar CHS 1 31201 1560 32761 8190 40951 4.91 3.44 1 38147 1907 40054 10014 50068 6.01 4.21
23 Khordha Jatani 31201 1560 32761 8190 40951 0.00 0.00
24 Khordha Khordha 1 31201 1560 32761 8190 40951 4.91 3.44
25 Koraput Jeypore 31201 1560 32761 8190 40951 0.00 0.00
26 Koraput Sunabeda 31201 1560 32761 8190 40951 0.00 0.00
27 Koraput Koraput 1 31201 1560 32761 8190 1800 42751 5.13 3.59
28 Malkangiri Malkangiri 1 31201 1560 32761 8190 1800 42751 5.13 3.59
29 Mayurbhanj Baripada 1 31201 1560 32761 8190 40951 4.91 3.44
30 Nawarangpur Nawarangpur 1 31201 1560 32761 8190 1800 42751 5.13 3.59
31 Puri Puri 1 31201 1560 32761 8190 40951 4.91 3.44
32 Rayagada Rayagada 1 31201 1560 32761 8190 1800 42751 5.13 3.59
33 Sambalpur Sambalpur CHS 1 31201 1560 32761 8190 40951 4.91 3.44 1 38147 1907 40054 10014 50068 6.01 4.21
34 Sundagarhh Rourkela CHS 1 31201 1560 32761 8190 40951 4.91 3.44 1 38147 1907 40054 10014 50068 6.01 4.21
35 Sundagarhh Rajgangpur 31201 1560 32761 8190 40951 0.00 0.00
36 Sundagarhh Sundargarh 1 31201 1560 32761 8190 40951 4.91 3.44
37 State State
28 139.32 97.53 5 30.04 21.03
District/ City Level Manpower
Name of the Position
Total
City Programme Manager (U.16.8.3.1)Asst. Programme Manager- Urban Health (U.16.8.2.1)
Sl. NoName of the
DistrictName of the City
Page 275 of 280
District Level HR Annex
1 Angul Angul
2 Balasore Balasore
3 Bargarh Bargarh
4 Bhadrak Bhadrak
5 Bolangir Bolangir
6 Cuttack Cuttack CHS
7 Cuttack Choudwar
8 Dhenkanal Dhenkanal
9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS
11 Jagatsinghpur Paradeep
12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar
14 Jajpur Jajpur
15 Jharsugada Jharsugada
16 Jharsugada Brajarajnagar
17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani
19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS
23 Khordha Jatani
24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda
27 Koraput Koraput
28 Malkangiri Malkangiri
29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS
34 Sundagarhh Rourkela CHS
35 Sundagarhh Rajgangpur
36 Sundagarhh Sundargarh
37 State State
District/ City Level Manpower
Total
Sl. NoName of the
DistrictName of the City No of
Existing
Position
Base
2017-18
Incremen
t (5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total
Per
Month
Total
(in
lakhs)
Budget
Approved
70%
No of
Existing
Position
No of
New
Position
Base
2017-
18
Increm
ent
(5%)
Revised
Base
2018-19
PI
Maximu
m 25%
Total
Per
Month
Total
(in
lakhs)
Budget
Approved
70%
1 31201 1560 32761 8190 40951 4.91 3.44 1 31201 1560 32761 8190 40951 3.69 2.58
1 31201 1560 32761 8190 40951 4.91 3.44 1 31201 1560 32761 8190 40951 3.69 2.58
1 31201 1560 32761 8190 40951 4.91 3.44 1 31201 1560 32761 8190 40951 4.91 3.44
1 31201 1560 32761 8190 40951 4.91 3.44 1 31201 1560 32761 8190 40951 3.69 2.58
1 31201 1560 32761 8190 40951 4.91 3.44 1 31201 1560 32761 8190 40951 3.69 2.58
5 24.57 17.20 1 4 19.66 13.76
City Data Manager (U.16.8.3.1)City Account Manager (U.16.8.3.1)
Name of the Position
Page 276 of 280
District Level HR Annex
1 Angul Angul
2 Balasore Balasore
3 Bargarh Bargarh
4 Bhadrak Bhadrak
5 Bolangir Bolangir
6 Cuttack Cuttack CHS
7 Cuttack Choudwar
8 Dhenkanal Dhenkanal
9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS
11 Jagatsinghpur Paradeep
12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar
14 Jajpur Jajpur
15 Jharsugada Jharsugada
16 Jharsugada Brajarajnagar
17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani
19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS
23 Khordha Jatani
24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda
27 Koraput Koraput
28 Malkangiri Malkangiri
29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS
34 Sundagarhh Rourkela CHS
35 Sundagarhh Rajgangpur
36 Sundagarhh Sundargarh
37 State State
District/ City Level Manpower
Total
Sl. NoName of the
DistrictName of the City No of
Existing
Position
Base
2017-18
Increment
(5%)
Revised
Base
2018-19
PI
Maximum
25%
Total Per
Month
Total
(in lakhs)
Budget
Approved
70%
No of
Existing
Position
Base
2017-18
Increment
(5%)
Revised
Base
2018-19
PI
Maximum
25%
Total Per
Month
Total
(in lakhs)
Budget
Approved
70%
1 20837 1042 21879 5470 27349 3.28 2.30 1 13230 662 13892 3473 17365 2.08 1.46
1 20837 1042 21879 5470 27349 3.28 2.30 1 13230 662 13892 3473 17365 2.08 1.46
1 20837 1042 21879 5470 27349 3.28 2.30 1 13230 662 13892 3473 17365 2.08 1.46
1 20837 1042 21879 5470 27349 3.28 2.30 1 13230 662 13892 3473 17365 2.08 1.46
1 20837 1042 21879 5470 27349 3.28 2.30 1 13230 662 13892 3473 17365 2.08 1.46
5 16.41 11.49 5 10.42 7.29
DEO (Base rationalised as per state's decision) (U.16.8.3.1)Programme Assistant (U.16.8.3.1)
Name of the Position
Page 277 of 280
District Level HR Annex
1 Angul Angul
2 Balasore Balasore
3 Bargarh Bargarh
4 Bhadrak Bhadrak
5 Bolangir Bolangir
6 Cuttack Cuttack CHS
7 Cuttack Choudwar
8 Dhenkanal Dhenkanal
9 Gajapati Paralakhemundi
10 Ganjam Berhampur CHS
11 Jagatsinghpur Paradeep
12 Jagatsinghpur Jagatsinghpur
13 Jajpur Byasanagar
14 Jajpur Jajpur
15 Jharsugada Jharsugada
16 Jharsugada Brajarajnagar
17 Kalahandi Bhawanipatna
18 Kandhamal Phulabani
19 Kendrapara Kendrapara
20 Keonjhar Keonjhar
21 Keonjhar Barbil
22 Khordha Bhubaneswar CHS
23 Khordha Jatani
24 Khordha Khordha
25 Koraput Jeypore
26 Koraput Sunabeda
27 Koraput Koraput
28 Malkangiri Malkangiri
29 Mayurbhanj Baripada
30 Nawarangpur Nawarangpur
31 Puri Puri
32 Rayagada Rayagada
33 Sambalpur Sambalpur CHS
34 Sundagarhh Rourkela CHS
35 Sundagarhh Rajgangpur
36 Sundagarhh Sundargarh
37 State State
District/ City Level Manpower
Total
Sl. NoName of the
DistrictName of the City No of
Existing
Position
Base
2017-18
Total
(in lakhs)
Budget
Approved
70%
No of
Existing
Position
No of New
Position
Base
2017-18
Increment
(5%)
Revised
Base
2018-19
PI
Maximum
25%
Total Per
Month
Total
(in lakhs)
Budget
Approved
70%
8415 0.00 0.00 11000 550 11550 2888 14438 0.00 0.00
4 8415 4.0392 2.83 2 1 11000 550 11550 2888 14438 4.76 3.34
4 8415 4.0392 2.83 2 11000 550 11550 2888 14438 3.47 2.43
2 8415 2.0196 1.41 2 11000 550 11550 2888 14438 3.47 2.43
4 8415 4.0392 2.83 2 11000 550 11550 2888 14438 3.47 2.43
12 8415 12.12 8.48 13 11000 550 11550 2888 14438 22.52 15.77
2 8415 2.0196 1.41 1 11000 550 11550 2888 14438 1.73 1.21
2 8415 2.0196 1.41 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
12 8415 12.12 8.48 7 11000 550 11550 2888 14438 12.13 8.49
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
3 8415 3.0294 2.12 1 1 11000 550 11550 2888 14438 3.03 2.12
2 8415 2.0196 1.41 2 11000 550 11550 2888 14438 3.47 2.43
2 8415 2.0196 1.41 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
18 8415 18.18 12.72 22 11000 550 11550 2888 14438 38.12 26.68
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
2 8415 2.0196 1.41 1 1 11000 550 11550 2888 14438 3.03 2.12
4 8415 4.0392 2.83 2 11000 550 11550 2888 14438 3.47 2.43
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
2 8415 2.0196 1.41 0 11000 550 11550 2888 14438 0.00 0.00
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
2 8415 2.0196 1.41 2 11000 550 11550 2888 14438 3.47 2.43
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
1 8415 1.0098 0.71 4 1 11000 550 11550 2888 14438 8.23 5.76
2 8415 2.0196 1.41 1 11000 550 11550 2888 14438 1.73 1.21
1 8415 1.01 0.71 8 11000 550 11550 2888 14438 13.86 9.70
17 8415 17.17 12.02 6 5 11000 550 11550 2888 14438 16.89 11.82
8415 0 0.00 1 11000 550 11550 2888 14438 1.73 1.21
8415 0 0.00 0 11000 550 11550 2888 14438 0.00 0.00
98 98.96 69.27 88 9 164.16 114.91
Name of the Position
Other Support staff (U.8.1.10.1) DEO cum Accountant (U.8.1.10.2)
Page 278 of 280
EPF (annex)
UPHC UCHC UPHC UCHC UPHC UCHC UPHC UCHC UPHC UCHC UPHC UCHC
1 Angul 3 52,907 - - - - - - - - 52,907 - 52,907
2 Balasore 14 1 1 2,46,900 - - 18,245 - - - - 21,922 2,87,067 - 2,87,067
3 Barbil 5 1 88,179 - - - - - - - 21,922 1,10,101 - 1,10,101
4 Bargarh 10 2 1 1 1 1,76,357 45,326 - 18,245 - 18,245 - - 21,922 2,80,095 - 2,80,095
5 Baripada 5 2 1 1 1 88,179 45,326 - 18,245 - 18,245 - - 21,922 1,91,917 - 1,91,917
6 Berhampur CHS 37 4 2 1 2 6,52,522 90,653 - 36,490 - 18,245 - - 43,843 8,41,753 - 8,41,753
7 Bhadrak 12 1 2,11,629 - - - - - - - 21,922 2,33,551 - 2,33,551
8 Bhawanipatna 7 1,23,450 - - - - - - - - 1,23,450 - 1,23,450
9 Bhubaneswar CHS 50 34 13 17 4 1 17 8,81,786 7,70,550 2,94,622 3,10,162 3,34,031 18,245 - - 3,72,667 29,82,063 - 29,82,063
10 Bolangir 6 1,05,814 - - - - - - - - 1,05,814 - 1,05,814
11 Brajarajnagar 3 1 52,907 - - - - - - - 21,922 74,829 - 74,829
12 Byasanagar 0 1 - - - - - - - - 21,922 21,922 - 21,922
13 Choudwar 5 88,179 - - - - - - - - 88,179 - 88,179
14 Cuttack CHS 39 18 4 9 2 2 2 1 9 6,87,793 4,07,938 90,653 1,64,204 36,452 36,490 36,490.00 21,922 1,97,294 16,79,236 21,922 16,57,314
15 Dhenkanal 4 2 1 1 1 70,543 45,326 - 18,245 - 18,245 - - 21,922 1,74,281 - 1,74,281
16 Jagatsinghpur 2 35,271 - - - - - - - - 35,271 - 35,271
17 Jajpur 4 70,543 - - - - - - - - 70,543 - 70,543
18 Jatani 5 1 88,179 - - - - - - - 21,922 1,10,101 - 1,10,101
19 Jeypore 6 1,05,814 - - - - - - - - 1,05,814 - 1,05,814
20 Jharsugada 5 88,179 - - - - - - - - 88,179 - 88,179
21 Kendrapara 3 52,907 - - - - - - - - 52,907 - 52,907
22 Keonjhar 6 2 1 1 1,05,814 45,326 - 18,245 - - - - 21,922 1,91,307 - 1,91,307
23 Khordha 4 2 1 1 70,543 45,326 - 18,245 - - - - 21,922 1,56,036 - 1,56,036
24 Koraput 3 52,907 - - - - - - - - 52,907 - 52,907
25 Malkangiri 1 17,636 - - - - - - - - 17,636 - 17,636
26 Nawarangpur 4 70,543 - - - - - - - - 70,543 - 70,543
27 Paradeep 6 1 1,05,814 - - - - - - - 21,922 1,27,736 - 1,27,736
28 Paralakhemundi 5 2 1 1 88,179 45,326 - 18,245 - - - - 21,922 1,73,672 - 1,73,672
29 Phulabani 4 70,543 - - - - - - - - 70,543 - 70,543
30 Puri 15 5 2 4 2,64,536 1,13,316 - 36,490 - - - - 87,686 5,02,028 - 5,02,028
31 Rajgangpur 4 1 70,543 - - - - - - - 21,922 92,465 - 92,465
32 Rayagada 7 2 1 1 1 1,23,450 45,326 - 18,245 - 18,245 - - 21,922 2,27,188 - 2,27,188
33 Rourkela CHS 30 8 4 4 4 5,29,072 1,81,306 - 72,979 - 72,979 - - 87,686 9,44,022 - 9,44,022
34 Sambalpur CHS 26 12 7 2 1 8 4,58,529 2,71,959 - 1,27,714 - 36,490 - 21,922 1,75,373 10,91,987 21,922 10,70,065
35 Sunabeda 4 1 70,543 - - - - - - - 21,922 92,465 - 92,465
36 Sundargarh 3 52,907 - - - - - - - - 52,907 - 52,907
347 95 17 49 6 14 2 2 60 61,19,597 21,53,004 3,85,275 8,93,999 3,70,483 2,55,429 36,490 43,844 13,15,301 ######### 43,844 #########
EPF Annexure
EPF for
PM HR
EPF for
Other HR
Total
Total EPF break up
ANM
Staff Nurse Lab Technician Pharmacists
DEO
Dat
a A
ssis
tan
t
cum
Acc
ou
nta
nt
ANM
Staff Nurse Lab Technician
Sl No. Name of the City
No. of positions EPF amount on base salary
Total
amount
(Budgeted
100%)
Pharmacists
DEO
Data
Assistant
cum
Accountant
Page 279 of 280
Prog Mgt. HR
Existing New * Total
Base
Remuneration
per month
Increment @
5%
Revised base
remuneration
KBK
Incentive
PI @ 25%
(max) on
revised base
Total amount
per annum
(Rs.)
Budgeted 70%
(Rs.)
P.2.1.4 U.16.8.1.4 Addl. Mission Director 1 1 - - 1,03,074 - - 12,36,888 8,65,822
Programme Manager-UH 1 1 55,456 2,773 58,229 - 14,557 8,73,432 6,11,402
Accounts Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Data Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Convergence & Community Process
Manager-UH 1 1 48,510 2,426 50,936 - 12,734 7,64,040 5,34,828
Programme Associate-UH 1 1 31,201 1,560 32,761 - 8,190 4,91,412 3,43,988
Programme Assistant-UH 1 1 24,696 1,235 25,931 - 6,483 3,88,968 2,72,278
Asst Program Manager-UH
At KBK district 8 8 31,201 1,560 32,761 1,800 8,190 41,04,096 28,72,867
At Non KBK district 15 15 31,201 1,560 32,761 - 8,190 73,71,180 51,59,826
City Programme Manager 5 5 38,147 1,907 40,054 - 10,014 30,04,080 21,02,856
City Accounts Manager 5 5 31,201 1,560 32,761 - 8,190 24,57,060 17,19,942
City Data Manager 1 4 5 31,201 1,560 32,761 - 8,190 19,65,648 13,75,954
Asst. Programme Manager- Urban
Health5 5 31,201 1,560 32,761 - 8,190 24,57,060 17,19,942
Programme Assistant 5 5 20,837 1,042 21,879 - 5,470 16,40,940 11,48,658
DEO (Base rationalised as per
state's decision) 5 5 13,230 662 13,892 - 3,473 10,41,900 7,29,330
* Remuneration for new HR is proposed for 9 months
P.2.1.1 U.16.8.1.1
P.2.2.1 U.16.8.2.1
P.2.3.1 U.16.8.3.1
PROGRAM MANAGEMENT HR
Old FMR
code
New FMR
codeName of the position
Position Remuneration 2018-19
Page 280 of 280