Final minutes of 4.95th meeting held on 27-29 July, 2021
Minutes of the 4.95th VC Meetings of the State Level Expert Appraisal Committee
(SEAC), (Raj.), held on 27th ,28th and 29th July ,2021
The 4.95th VC Meeting of the members of State Level Expert Appraisal Committee
(SEAC), Rajasthan constituted for considering environmental clearance projects (B-category)
under GoI Notification 18.12.19 was held on 27th, 28th and 29th July, 2021 at 10:30 AM
through video conferencing under the Chairmanship of Sh. Manoj Kumar Agrawal. The
names of the members who attended the meeting are as follows:-
S. No. Name Designation 27.07.2021 28.07.2021 29.07.2021
1 Sh. Manoj Kumar
Agrawal
Chairman Attended Attended Attended
2 Dr. Suja George Vice
Chairman
- - -
3 Sh. Pushakar Singh
Shekhawat
Member Attended Attended Attended
4 Sh. Mukesh Behari
Sharma
Member Attended Attended Attended
5 Sh. Laxmi Kant
Dashora
Member Attended Attended Attended
6 Sh. Buddhi Prakash
Pareek
Member Attended Attended Attended
7 Sh. Vikram Singh
Chauhan
Member Attended Attended Attended
8 Sh. Nand Kumar
Khare
Co-opted
Member,
SEAC
- - -
The Secretary welcomed the members.
The SEAC considered the following 19 projects and 07 Additional agenda, with the
permission of Chairman, SEAC.
S.No File
No
Subject Project Proponent Name & Consultant
Name
1. 15817 EIA EMP of limestone (Minor
Mineral )From 14,600 TPA to
15,00,000 TPa (Lime stone burning
) M.L no-122/91,Area-
100.00hect.,By M/s Nitesh mineral
Pvt. Ltd location at village
Hariyadhana, tehsil- bilara, dist-
Jodhpur(Raj.) .(Proposal no-30615)
Project Proponent Name-M/S. Nitesh
Minerals Pvt. Ltd,Add-Old public park
Road ,near K.N.collage, Rai ka Bagh
Jodhpur(Rajasthan)Email-
CONSULTANTS- Udaipur Min-Tech
PVT. LTD.,Add-206,Apeksha
Complex.Sec-11.Hiran Magri,Udaipur (Raj)
2. 264 EIA EMP for of Chechat Limestone Proponent Name :- M/S SHIVA STONE
Final minutes of 4.95th meeting held on 27-29 July, 2021
Building Stone mine over an area of
24.2503 Hect.M.L.
NO-24/93 Near Village- Chechat
,Tehail-Ramganjmandi, District-
Kota, Rajasthan in favor of M/S
Shiva Stone.(Proposal No-60416)
,In Front of RSEB, Near Hotel Indraprastha,
NH-12,Jhalawar Rajasthan,Email-
Name of the Consultant:- EIA
CONSULTANT, M/s UDAIPUR MINE-
TECH PVT. LTD. 206,APEKSHA
COMPLEX. SEC-11.,HIRAN MAGRI,
UDAIPUR,(RAJ) Email:-
3. 16951 EIA EMP of Environmental
Clearance for “Limestone
(Dimensional) & Masonry Stone
(Kali Chat), Ref. No.
2019100004792, Area 4.00 ha.(Pvt.
Land), Near Village Pipliya
(Runji),Tehsil Pachpahar, District
Jhalawar, (Raj). Khasra No. 653,
284, 287, 289, 290, 291,
292, (Proposal No. 62668)
Name of Proponent:- Shri Pukhraj
Jain,Add- “Miraya Mension”Opposite
RSEB, Near Indraprasth Hotel, Tehsil
Jhalrapatan, District Jhalawar, (Raj.).Email
Name of Consultant: -M/s Udaipur Min-
Tech Pvt. Ltd.206, Apeksha Complex. Sec-
11. Hiran Magri, Udaipur, (Raj.).email:-
4. 19623 E C of Golpur Sandstone Mining
Project Plot No. 32, Area 1.00 Ha.,
Khase No. 369/5, Add.- Golpur,
Tehsil- Bundi, District- Bundi,
(Raj.) (Proposal No.- 216092)
Name of Proponant :- Shri- Preetam
Singh Bhadoriya S/o Shri- Harendra Singh
Bhadoriya, Add.- Behind Star Public
School, Govind Nagar Road, Prem Nagar 1,
Kota, District- Kota, (Raj.) Email-
Name of Consultant:- P AND M
SOLUTION, Add.- Shivani mines &
Minerals, B-39, RIICO, Housing Colony,
Beawar, Distt.- Ajmer (Raj.) Email.-
5. 19631 E C of Khananiya Khera Quartz &
Feldspar Mine M.L. No. 81/2002,
Area 5.00 Ha., Khase No. 522, 530,
531, 529, 528, 527, 534, 535, 541,
538, 540, 539, 536, Add.-
Khananiya Khera, Tehsil- Raipur,
District- Bhilwara, (Raj.) By Mr.
Shabbur Ahmad S/o Mr. Fakhruddin
Sheikh (Proposal No.- 208561)
Name of Proponant :- Mr. Shabbur
Ahmad S/o Mr. Fakhruddin Sheikh, Add.-
Regaron Ki Kui, Tehsil- Asind, District-
Bhilwara, (Raj.) Email-
Name of Consultant:- P AND M
SOLUTION, Add.- Shivani mines &
Minerals, B-39, RIICO, Housing Colony,
Beawar, Distt.- Ajmer (Raj.) Email.-
Final minutes of 4.95th meeting held on 27-29 July, 2021
6. 19602 E C for Masonry Stone Mining
Project" Plot No. 03, Area 1.00
Ha., Khase No. 957, 340, Add.-
Ramgarh Padlibad, Tehsil- Sikrai,
District- Dausa, (Raj.) (Proposal
No.- 208038)
Name of Proponant :- Shri- Ramavtar
Sharma S/o Shri- Kundan Ram Sharma,
Add.- 191/27, Sector-19, Pratap Nagar,
Sanganer, Jaipur, Distt.- Jaipur, (Raj.)
Email- [email protected]
Name of Consultant:- :- Globus
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
7. 19603 E C for Masonry Stone Mining
Project" Plot No. 02, Area 1.3774
Ha., Khase No. 957, 340, 171,
Add.- Ramgarh Geejgarh Padlibad,
Tehsil- Sikrai, District- Dausa,
(Raj.) (Proposal No.- 207955)
Name of Proponant :- Shri- Ramavtar
Sharma S/o Shri- Kundan Ram Sharma,
Add.- 191/27, Sector-19, Pratap Nagar,
Sanganer, Jaipur, Distt.- Jaipur, (Raj.)
Email- [email protected]
Name of Consultant:- :- Globus
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
8. 19618 E C for Masonry Stone Mining
Project" Plot No. 05, Area 1.8827
Ha., Khase No. 134, Add.- Kalwan,
Tehsil- Sikrai, District- Dausa,
(Raj.) (Proposal No.- 199978)
Name of Proponant :- Shri- Rajendra
Prasad Sharma S/o Shri- Rameshwar
Prasad Sharma, Add.- Kuiwali Dhani,
Raipura, Sikrai, Distt.- Dausa, (Raj.)
Email- [email protected]
Name of Consultant:- :- Globus
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
Final minutes of 4.95th meeting held on 27-29 July, 2021
9. 19619 E C for Sand Stone Mining
Project" Q.L. No. 2192, Area 0.18
Ha., Khase No. Not, Add.- Keru,
Tehsil- Jodhpur, District- Jodhpur,
(Raj.) (Proposal No.- 208590)
Name of Proponant :- Shri- Ghanshyam
Prajapati S/o Shri- Peeramal Prajapati,
Add.- Near Sankatmochan Balaji Temple
Duliya Bas, Sujangarh, Churu, Distt.-
Churu, (Raj.) Email-
Name of Consultant:- :- Globus
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
10. 18798 E C for Sandstone Mining Project"
Ref. No. 20191000014379, Area
1.877 Ha., Khase No. 352/4, 352/7,
352/9, 352/10, Add.- Badli, Tehsil-
Jodhpur, District- Jodhpur, (Raj.)
(Proposal No.- 62792)
Name of Proponant :- Smt.-Narbada
Kachhawaha W/o Shri- Panna Lal
Kachhawaha, Add.- Kishan Service Center,
Pratap Nagar, Soorsagar Road, Jodhpur,
Distt.- Jodhpur, (Raj.) Email-
Name of Consultant:- :- Globus
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
11. 18799 E C for Sandstone Mining Project"
Ref. No. 2019100004382, Area
1.4658 Ha., Khase No. 348/01,
Add.- Badli, Tehsil- Jodhpur,
District- Jodhpur, (Raj.) (Proposal
No.- 62778)
Name of Proponant :- Shri-Pukhraj Gehlot
S/o Shri- Ramchandra Gehlot, Add.- Gali
No. 1, Kheme Ka Kua, Pal road, Distt.-
Jodhpur, (Raj.) Email-
Name of Consultant:- :- Globus
Final minutes of 4.95th meeting held on 27-29 July, 2021
Environment Services, Add.- 326-AB, 3rd
Floor, Sahara Shopping Center, Lekhraj
Crossing, Faizabad Road, Lucknow (U.P.)
Email. –
12. 19606 E C for Masonry Stone (Crusher
Gitti) Mining Project Ref. No.
202010000 28711, M.L. No.
09/2020, Area 1.0427 Ha., Khase
No. 922, Add.- Kesunda, Tehsil-
Chhoti Sadri, District- Pratapgarh,
(Raj.) (Proposal No.- 214422)
Name of Proponant :- Shri- Labhachand
Meghwal S/o Shri- Gotam Lal Meghwal,
Add.- Kesunda, Tehsil- Chhoti Sadri,
Distt.- Pratapgarh, (Raj.) Email-
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected].
13. 19607 E C for Granite Mining Project
M.L. No. 30/2021, Plot No. 64,
Area 1.0159 Ha., Khase No. 1767,
1768, 1769, 1770, 1772, 1774,
Add.- Mankhand, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal
No.- 214058)
Name of Proponant :- Shri- Ugmaram
Khichad S/o Shri- Chelaram Khichad,
Add.- Mukam, Post- Seeniya, Ranigaon,
Tehsil- Makrana, Distt.- Nagaur, (Raj.)
Email- [email protected]
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected],
14. 19608 E C for Quartz Feldspar Mining
Project M.L. No. 58/2020, Area
1.0882 Ha., Khase No. 62/613, 63,
64, 65/1, 65/2, Add.- Rampuriya,
Tehsil- Saraha, District- Bhilwara,
(Raj.) (Proposal No.- 209709)
Name of Proponant :- Shri- Shankar Lal
Jat S/o Shri- Bhura Lal Jat, Add.-
Rampuriya, Post- Lakhola, Tehsil- Sahada,
Distt.- Bhilwara, (Raj.) Email-
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected],
15. 19622 E C for Granite Mining Project
M.L. No. 24/2021, Ref. No.
Name of Proponant :- Smt. Sangita Devi
W/o Shri- Hemraj Khatik, Add.- Ward No.
Final minutes of 4.95th meeting held on 27-29 July, 2021
20211000034409 Area 2.1528 Ha.,
Khase No. 2525, 2545, 4052/2524,
4478/2526, Add.- Bachhkhera,
Tehsil- Shahpura, District-
Bhilwara, (Raj.) (Proposal No.-
215008)
06, Khatik Mohalla Bachhkhera, Tehsil-
Shahpura, Distt.- Bhilwara, (Raj.)
Email- [email protected]
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected],
16. 19633 E C for Granite Mining Project
M.L. No. 31/2021, Area 1.0982
Ha., Khase No. 1772, 1773, 1774,
Add.- Mankhand, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal
No.- 216498)
Name of Proponant :- Shri- Amit Nayyar
S/o Shri- Praveen Kumar Nayyar, Add.- C-
17, Shalimar Colony, Adarsh Nagar, Ajmer,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected],
17. 19634 E C for Granite Mining Project
M.L. No. 32/2021, Area 1.0257
Ha., Khase No. 1772, 1773, 1774,
1775, Add.- Mankhand, Tehsil-
Kekri, District- Ajmer, (Raj.)
(Proposal No.- 216472)
Name of Proponant :- Shri- Amit Nayyar
S/o Shri- Praveen Kumar Nayyar, Add.- C-
17, Shalimar Colony, Adarsh Nagar, Ajmer,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Fulgro
Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika,
Khatipura Road, Jhotwara, Jaipur, (Raj.)
Email:- [email protected],
18. 19110 Environmental Clearance for Red
Ochre Mining Project ( ML. No.-
2/2020, Ref. No.- 20201000021155,
QL. Area- 2.0069ha., Khasra No.-
818, 819, 822, 825) Near Vill.-
Akhepur, Tehsil & Distt.-
Pratapgarh (Raj.) (Proposal No.-
193480)
Project Proponent Name- Smt. Resham
Bhai W/o Late Sh. Sukhnath, Add.- House
No.-8, Ward No.- 01, Jadwasa, Distt.-
Ratlam (MP)
Consultant Name-Fulgro Environmental &
Engineering Services India Pvt. Ltd.,
Add.- 27, Ashok Vatika, Khatipura Road,
Jhotwara, Jaipur, (Raj.).Email:-
Final minutes of 4.95th meeting held on 27-29 July, 2021
19. 16617 EIA EMP of Bhawanipura & Sutra
Sandstone & Khanda Mining Project
Ref. No. 2018100001552 Khasra
No. 138 & 140, at Near Village –
Bhawanipura, Tehsil – Talera,
Disst.- Bundi, (Raj.) (Proposal
No.61904)
Name of Proponant :- Shri Nana Lal
Dhakar, Co-owners – 1. Shri Jagdish Chand
Dhakar, 2. Shri Rekh Lal Darad, 3. Shri
Basanti Lal, Add.- E-820, Indra Vihar,
Kota Distt.- Kota (Raj.) Email –
Name of Consultant:- COGNIZANCE
RESEARCH INDIA PRIVATE LTD. Add.-
Office GT – 20, Sec – 117,
Noida (U.P.) Email –
20. 16564 EC of Bhawanipura & Sutra
Sandstone & Khanda Mining
Project (Ref. No.2018100001181)
Area-2.4111hect.,Khasra no-
1081/208,209,at village-Sutra,
Tehsil-Talera,Dist-
Bundi,Rajasthan,(Proposal No-
61918)
Name of Proponant : -Shri Devi Singh,Co-
owners-1.Shri Pappu Singh S/o Shri Kajod
Singh,2. Shri Mukesh Singh S/o Shri Kajod
Singh3. shri Bablu singh S/o Shri Kajod
Singh,Add-Sutra, Tehsi-Talera, Dist-
Bundi,Rajasthan,Email-
,[email protected], Name of
Consultant:- :- Cognizance Research
India Private Ltd.(Accredited by NABET,
Govt. of India Accredited No.
NABET/EIA/1619/IA006, Valid up to Aug
18, 2019)Office GT-20, Sec 177, Noida-
201301 (U.P.)email:-
21. 15883 EIA/EMP for Bhawanipura & Sutra
Sandstone & Khanda Mining
Project Reference No.
201810000631, Area-2.4353hact.,at
Vill.- Bhawanipura, Tehsil- Talera,
Distt.- Bundi, and State- Rajasthan.
(Praposal No- 61787)
Project Proponent Name- Shri Nanda
Karad, Vill.- Sutra Tehsil- Talera, Distt.-
Bundi (Raj.) Email.-
Consultant – COGNIZANCE RESEARCH
INDIA PRIVATE LTD. GT-20, Sec-117,
Noida-(U.P.)
Email. Cognizanceresearchimdiapl@
gmail. com
Final minutes of 4.95th meeting held on 27-29 July, 2021
22. 16819 EIA/EMP of Fakoliya
Granite Mining Project M.L. No.
23/2007, Khasra No. – 1523/1362,
1524/1362, at village- Fakoliya,
Tehsil- Karera, Dist- Bhilwara,
State-(Raj.), (Proposal No-61868)
Project Proponent Name- Shri Ankit
Kumar Surya, Add- Shanti Vila, Vidhya
Niketan, Tehsil- Amet, Dist- Rajsamand,
(H.R.) Email- [email protected]
Name of Consultant:- Cognizance Research
India Pvt. Ltd. Add.- GT -20, Sec - 117,
Noida (U.P.) Email.
cognizanceresearchindiapl@gmail. com
23. 19624 E C for Dhuwaliya Granite Mining
Project" M.L. No. 22/2021, Area
1.7215 Ha., Khase No. 1117, 1119,
1335/1119, 1342/1119, Add.-
Dhuwaliya, Tehsil- Kekri, District-
Ajmer, (Raj.) (Proposal No.-
215260)
Name of Proponant :- M/s Shri Shyam
Minerals, Add.- Khasra No. 117, Vill.-
Dhuwaliya, Tehsil- Kekri, Distt.- Ajmer,
(Raj.) (Project Proponent) Shri- Piyush
Kumar S/o Shri Ram Kumar Singh, Add.-
Adarsh Colony, Nawalgarh Road, Sikar,
Distt.- Sikar, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
24. 19593 Environmental Clearance Golpur
Sand Stone Mining Project, (Plot
No.- 39, Area-1.00 ha. Khasra
No.- 369/5), Near Vill.- Golpur,
Tehsil- Bundi Distt.-Bundi (Raj.)
(Proposal No.-207622)
Project Proponent Name- - M/s Sukesh
Industries Pvt. Ltd., Project In Charge- Shri
Naveen Jain, Add.- R/o--263/05, Pratap
Nagar, Sanganer, Jaipur(Raj.) Email-
Consultant Name:-Cognizance Research
India Private Ltd., Add.-Office GT-20, Sec
177, Noida- 201301 (U.P.)
email:-
25. 19604 E C for Kachariya Granite Mining
Project" M.L. No. 15/2021, Area
Name of Proponant :- Shri- Natvarlal
Sharma S/o Shri- Balkishan Sharma, Add.-
Final minutes of 4.95th meeting held on 27-29 July, 2021
2.9217 Ha., Khase No. 238/99,
Add.- Kachariya, Tehsil-
Kishangarh, District- Ajmer, (Raj.)
(Proposal No.- 214669)
Ward No. 41, Kachariya pith Marg,
Kachariya mandir, Kishangarh, tehsil-
Kishangarh, Distt.- Ajmer, (Raj.)
Email- [email protected]
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
26. 19605 E C for Kachariya Granite Mining
Project" M.L. No. 13/2021, Area
1.6186 Ha., Khase No. 377/244,
Add.- Kachariya, Tehsil-
Kishangarh, District- Ajmer, (Raj.)
(Proposal No.- 214993)
Name of Proponant :- Shri Mohanshyam,
Add.- Ward No. 41, Kachariya pith Marg,
Kachariya mandir, Kishangarh, tehsil-
Kishangarh, Distt.- Ajmer, (Raj.)
Email- [email protected]
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
27. 19609
Environmental Clearance for
Pipliya Granite Mining Project
(R.F.No-20211000031500),Area-
2.2258hact.,khasra No-777/3,768/3,
At Village-Pipliya, Tehsil-
Malpura,District-Tonk,State-
Rajasthan,(Proposal NO-214738)
Name of Proponant :- Shri Rajesh yadav,
Co-Applicant-Shri kamlesh,Add-
Chavandiya, Tonk,Rajasthan,Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
28. 19610 E C for Udaipur Khurd Granite
Mining Project" M.L. No. 09/2021,
Area 1.1057 Ha., Khase No.
Name of Proponant :- M/s Raghupati
Mines & Minerals, Add.- LG-03 Murliwala
Tower Jaipur Road, Tehsil.- Madanganj-
Final minutes of 4.95th meeting held on 27-29 July, 2021
351/224, Add.- Udaipur Khurd,
Tehsil- Kishangarh, District- Ajmer,
(Raj.) (Proposal No.- 213932)
Kishangarh, Distt.- Ajmer, (Raj.) (Project
Pro.) Shri- Satya Narayan Garg S/o Shri-
Kailash Chand Garg, Add.- Plot No. 6,
Jivan-Deep Colony, Madanganj-
Kishangarh, Distt.- Ajmer, (Raj.)
Email- [email protected]
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
29. 19611 E C for Udaipur Khurd Masonary
Stone Mining Project" M.L. No.
22/2020, Area 1.6893 Ha., Khase
No. Not, Add.- Udaipur Khurd,
Tehsil- Kishangarh, District- Ajmer,
(Raj.) (Proposal No.- 211368)
Name of Proponant :- M/s Shree Ji Stonex,
Add.- N.H.8, Veer Taja Market, RAmner
Choraha, Ajmer Bypass, Tehil- Kishangarh,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
30. 19612 E C for Morajhari Granite Mining
Project" Plot No. 106, Area 1.44
Ha., Khase No. 1473 & 1735,
Add.- Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal
No.- 213570)
Name of Proponant :- Shri- Raghav
Chhaparwal S/o Shri- Shiv Prakash
Chhaparwal, Add.- Morajhari, Tehil-
Nasirabad, Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
Final minutes of 4.95th meeting held on 27-29 July, 2021
31. 19613 E C for Morajhari Granite Mining
Project" Plot No. 109, Area 1.32
Ha., Khase No. 1473 & 1735,
Add.- Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal
No.- 213575)
Name of Proponant :- Shri- Raghav
Chhaparwal S/o Shri- Shiv Prakash
Chhaparwal, Add.- Morajhari, Tehil-
Nasirabad, Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
32. 19614 E C for Ladera Granite Mining
Project" Ref. No. 2019100002852,
Area 1.0308 Ha., Khase No.
1743/1177 & 1178, Add.- Ladera,
Tehsil- Dudu, District- Jaipur,
(Raj.) (Proposal No.- 208660)
Name of Proponant :- M/s Unique
Granites, Add.- Shah Gokul Chand
Manohar Lal Near Balaji Temple,
Kishangarh, Distt.- Ajmer, (Raj.) Shri-
Abhishek Baheti S/o Shri- Jugal Kishor
Baheti, Add.- Baheti Bhavan, Katla Bazar,
Madangaj, Kishangarh, Distt.- Ajmer, (Raj.)
Email- [email protected]
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
33. 19615 Environmental Clearance for
Amargarh (Chang) Granite Mining
Project, (Plot No.- 48) Area-2.00 ha.
), Near Vill.- Amargarh, Tehsil-
Raipur, Distt.-Pali(Raj.) (Proposal
No.-211255)
Project Proponent Name- - Shri
Pushpendra Singh, Add.- R/o--Behind Shiv
Temple, Jaton Ka Bans, Jasnagar, Tehsil-
Riyanbadi, Distt.- Nagaur (Raj.) Email-
Consultant Name:-Cognizance Research
India Private Ltd., Add.-Office GT-20, Sec
177, Noida- 201301 (U.P.)
email:-
Final minutes of 4.95th meeting held on 27-29 July, 2021
34. 19616 Environmental Clearance of
Rambari Quartz & Feldspar Mining
Project, (ML. No.- 10/2009 Area-
4.00 ha. ), Near Vill.- Rambari,
Tehsil- Nasirbad, Distt.- Ajmer(Raj.)
(Proposal No.-211340)
Project Proponent Name- - Shri Chand
Mohammad, Add.- R/o-- Near Bus Stand,
Vill.- Ramsar, Tehsil- Nasirabad, Distt.-
Ajmer (Raj.) Email-
Consultant Name:-Cognizance Research
India Private Ltd., Add.-Office GT-20, Sec
177, Noida- 201301 (U.P.)
email:-
35. 19625 E C for Granite Mining Project"
Plot No. 108, Area 1.50 Ha., Khase
No. 1473, Add.- Morajhari, Tehsil-
Nasirabad, District- Ajmer, (Raj.)
(Proposal No.- 215442)
Name of Proponant :- Shri- Naresh
Agarwal, Add.- Sadar Bazar, Tantoti,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
36. 18031 EC of our Proposed “Quartz and
Feldspar Mine (M.L. No. 15/03)
Mining Lease Area 4.0 Hect.
, Khasra No. 8566, Near Vill.–
Devipura, Tehsil- Masuda, Distt.-
Ajmer, (Raj. (Proposal No. 139295)
Name of Proponant :- Shri Akhil
Sharma, Add.- C-53, RIICO Housing
Colony, Ajmer Road, Tehsil - Beawar
Distt.- Ajmer, (Raj.) Email.
[email protected] of Consultant:-
GAURANG ENVIRONMENTAL
SOLUTIONS PVT. LTD. Add.- 102, SNG,
Shri Ratna Apartment, Near Tambi Petrol
Pump, Peetal Factory, Jhotwara Road,
Jaipur, (Rajasthan) Email. –
Final minutes of 4.95th meeting held on 27-29 July, 2021
37. 19626
E C for Granite Mining Project"
Plot No. 107, Area 1.3680 Ha.,
Khase No. 1473 & 1735, Add.-
Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal
No.- 215473)
Name of Proponant :- Shri- Parasmal
Dhabariya, Add.- Sadar Bazar, Tantoti,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
38. 19627 E C for Granite Mining Project"
M.L. No. 02/2021, Area 1.5968
Ha., Khase No. Not, Add.- Nallu,
Tehsil- Kishangarh, District- Ajmer,
(Raj.) (Proposal No.- 214716)
Name of Proponant :- M/s Stone Tech
Granites, (Project in Charge) Shri- Jayram
Buldak S/o Shri- Mohan Ram, Add.-
Kh.No. 421/2, Khatoli, Tehsil- Kishangarh,
Distt.- Ajmer, (Raj.) Email-
Name of Consultant:- :- Cognizance
Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301
(U.P.) Email:-
39. 19582 Environmental Clearance for Juni
Aati Masonry Stone Mining Project,
Plot No.- 103, Area- 1.00 ha.,
Khasra No.- 579/321 Near Vill.-
Juni Aati, Tehsil & Distt.- Barmer
(Raj).(Proposal No.-214172)
Project Proponent Name- - M/s Tan
Singh Chouhan, Add.- R/o- Gandhi
Nagar,Tehsil & Distt.- Barmer (Raj.) Email-
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
(Raj.)
Email- [email protected]
40. 19583 Environmental Clearance for
Sodhon ki Dhani Masonry Stone
Mining Project Ref. No.-
20201000022559, Near Vill.-
Project Proponent Name- - M/s Tan
Singh Chouhan, Add.- R/o- Gandhi
Nagar,Tehsil & Distt.- Barmer (Raj.) Email-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Sodhon Ki Dhani, Tehsil & Distt.-
Barmer (Raj.)Area- 2.00 ha.,
Khasara No.- 947/95, Near Vill.-
Juni Aanti Tehsil& Distt.- Barmer
(Raj.)(Proposal No.-214348)
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
(Raj.)
Email- [email protected]
41. 19586 Environmental Clearance for Bapcha
Masonry Stone Mine Ref. No.-
20191000014037, Proposed
Production- 200000 TPA (ROM)of
Masonry Stone Mine Applied area-
1.1612 ha., Khasra No.- 444 & 445,
Near Vill.- Bapcha, Tehsil- Chhabra,
Distt.- Baran(Raj).(Proposal No.-
207963)
Project Proponent Name- - Smt. Anita
Bagdi W/o Sh. Satyendra Maheshwari,
Add.- R/o- A-9-10, Shastri Nagar, Ward
No.-02, Hill View Colony, Chhabra, Distt.-
Baran (Raj.) Email-
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
(Raj.)
Email- [email protected]
42. 19587 Environmental Clearance for
Ganerav Granite Mining Project,
Ref. No.- 20191000010415,
Proposed Production- 65850 TPA
(ROM)of Mineral Granite , Khasra
No.- 4296/196, Near Vill.- Ganerav,
Tehsil- Desuri, Distt.- Pali
(Raj).(Proposal No.-209034)
Project Proponent Name- - Shri Chandra
Prakash Salvi, Add.- R/o- Salviyon Ka
Mohlla, Biyanan Post Tikad, Tehsil-
Devgarh, Distt.- Pali (Raj.) Email-
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
(Raj.)
Email- [email protected]
43. 19588 Environmental Clearance for Juni
Aati Masonry Stone Mining Project,
Plot No.- 98, Area- 1.00 ha., Khasra
No.- 579/321 Near Vill.- Juni Aati,
Tehsil & Distt.- Barmer
(Raj).(Proposal No.-213961)
Project Proponent Name- - M/s Tan
Singh Chouhan, Add.- R/o- Gandhi
Nagar,Tehsil & Distt.- Barmer (Raj.) Email-
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
Final minutes of 4.95th meeting held on 27-29 July, 2021
(Raj.)
Email- [email protected]
44. 19601 E C of Ghatiyali Granite Mining
Project Ref. No. 20201000026666,
Area 1.0198 Ha., Khase No.
1072/854, Production Capacity -
1,01,002, TPA (RoM), Mineral
Granite, Add.- Ghatiyali, Tehsil-
Phagi, District- Jaipur, (Raj.)
(Proposal No.- 209139)
Name of Proponant :- Shri- Prakash
Ranwa S/o Shri- Rameshwar Lal, Add.-
Ranwa House, Choudhary Charan Singh
Nagar, Navalgarh Road, Ward No. 41,
Distt- Sikar, (Raj.) (Co-Applicant), Shri-
Rameshwar Lal Choudhary S/o Shri- Tulsi
Ram Choudhary, Add.- Sikar Marg, Kadva
Complex Kuchaman City, Nagaur, Distt.-
Nagaur, (Raj.) Email-
Name of Consultant:- M/s. N.S. Envro-
Tech Laboratories & Consultant, , Add-
Plot No. 51, Ganeta House, Shiv Vihar
Colony, Near Patrakar Colony Road,
Mansarovar, Jaipur (Raj.).
Email:- [email protected]
45. 19617 Environmental Clearance of our
Bambuliya Ghata Masonry Stone
Mine Ref. No.- 20191000014359,
M.L. No.- 04/2019, Area- 1.00 ha.,
Khasara No.- 947/95, Near Vill.-
Bambuliya Ghata, Tehsil- Pipalda
Distt.- Kota (Raj.) in favor of Shri
Bijendra Verma (Raj.)(Proposal
No.-209141)
Project Proponent Name- - Shri
Bijendra Verma , Add.- R/o- Vill.- Jhirwali
Ka Bas, Post- Karoth, Tehsil- Rajgarh,
Distt.- Alwar (Raj.) Email-
Consultant Name:-M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-
51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur-
(Raj.)
Email- [email protected]
46. 19620 E C of Proposed Project of Masonry
Stone Mining Plot. No. 176/1996,
Area 1.00 Ha., Khase No. 336,
Add.- Bhopas Dungri, Tehsil-
Name of Proponant :- Shri- Mahendra
Kumar Saini S/o Shri- Rajendra Kumar
Saini, Add.- K-25, Bhawani Nagar,
Murlipura, Jaipur, Distt.- Jaipur, (Raj.)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Chomu, District- Jaipur, (Raj.) By
Shri- Mahendra Kumar Saini S/o
Shri- Rajendra Kumar Saini, Cat. B-
2, (Proposal No.- 215830)
Email- [email protected]
Name of Consultant:- M/s. N.S. Envro-
Tech Laboratories & Consultant, , Add-
Plot No. 51, Ganeta House, Shiv Vihar
Colony, Near Patrakar Colony Road,
Mansarovar, Jaipur (Raj.).
Email:- [email protected]
47. 19621 E C of Proposed Project of Masonry
Stone Mining Plot. No. 16/2020,
Area 1.6997 Ha., Khase No. 410,
Add.- Gunawata, Tehsil- Amer,
District- Jaipur, (Raj.) By Shri-
Ramesh Chand Gupta S/o Shri-
Gyarsi Lal Gupta, Cat. B-2,
(Proposal No.- 215850)
Name of Proponant :- Shri- Ramesh
Chand Gupta S/o Shri- Gyarsi Lal Gupta,
Add.- 11-Moji Colony, Malviyanagar,
Distt.- Jaipur, (Raj.) Email-
Name of Consultant:- M/s. N.S. Envro-
Tech Laboratories & Consultant, , Add-
Plot No. 51, Ganeta House, Shiv Vihar
Colony, Near Patrakar Colony Road,
Mansarovar, Jaipur (Raj.).
Email:- [email protected]
48. 19595 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project, (ML. No.- 86/2010
Area-1.00 ha. Khasra No.-295 ),
Production Capacity- 55000 TPA
(ROM) {Salable Mineral- 49500
TPA, Waste- 5500 TPA }Near
Vill.- Bhedoli, Tehsil- Bonli, Distt.-
Sawai Madhopur (Raj.)by M/s
Aditya Minerals (Raj.)(Proposal
No.-212036)
Project Proponent Name- - M/s Aditya
Minerals, Add.- R/o-- Jai Mandir Ke Pass,
Jhilai Road, Niwai, Distt.- Tonk (Raj.)
Email- [email protected]
Consultant Name:-:-VARDAN
ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT
Manesar, Gurgaon-122003 (Haryana).
email:- [email protected]
49. 19596 Environmental Clearance for Quartz
& Feldspar (Minor Mineral) Mining
Project Proponent Name- - M/s Jai
Shree Ganga Mines, Add.- R/o-Ward No.-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Project, (ML. No.- 110/2012 Area-
4.5007 ha. Khasra No.- 1793,
3168/1794, 3157/1794, 1795, 1791),
Production Capacity- 179494 TPA
(ROM) {Salable 125646 TPA, Sub
grade- 26924 TPA & Waste- 26924
TPA }Near Vill.- Khemana, Tehsil-
Raipur, Distt.- Bhilwara, (Raj.)by
M/s Jai Shree Ganga Mines
(Raj.)(Proposal No.-212082)
5, Main Road, Gangapur, Tehsil- Sahada,
Distt.- Bhilwara (Raj.) Email-
Consultant Name:-VARDAN
ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT
Manesar, Gurgaon-122003 (Haryana).
email:- [email protected]
50. 19598 Environmental Clearance for
Marble Mineral Mining Project, Plot
No.- 5, Proposed Production
Capacity- 348106 TPA (ROM)
{Salable Mineral Marble- 131021
TPA, Waste- 191367 TPA & OB-
25718 T}Area- 4.0 ha., Khasra no.-
1536, Near Vill.- Lohagarh, Tehsil-
Dhariyawad, Distt.- Pratapgarh
(Raj.)by M/s Paramount Mines &
Minerals (Raj.)(Proposal No.-
210560)
Project Proponent Name- - M/s
Paramount Mines & Minerals Pro. Shri
Mahesh Agarwal , Add.- R/o- B-106, 10-B,
Scheme Gopalpura Bypass Jaipur, (Raj.)
Email- [email protected]
Consultant Name:-VARDAN
ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT
Manesar, Gurgaon-122003 (Haryana).
email:- [email protected]
51. 19599 Environmental Clearance for
Marble Mineral Mining Project, Plot
No.- 6, Production Capacity-
309529 TPA (ROM) {Salable
Mineral Marble- 125234 TPA,
Waste- 158577 TPA & OB- 25718
T}Area- 4.0 ha., Khasra no.- 1536,
Near Vill.- Lohagarh, Tehsil-
Dhariyawad, Distt.- Pratapgarh
(Raj.)by M/s Paramount Mines &
Minerals (Raj.)(Proposal No.-
210620)
Project Proponent Name- - M/s
Paramount Mines & Minerals Pro. Shri
Mahesh Agarwal , Add.- R/o- B-106, 10-B,
Scheme Gopalpura Bypass Jaipur, (Raj.)
Email- [email protected]
Consultant Name:-VARDAN
ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT
Manesar, Gurgaon-122003 (Haryana).
email:- [email protected]
Final minutes of 4.95th meeting held on 27-29 July, 2021
52. 19628 Transfer of E C under clause 11 of
EIA notification issued for Marble
Mining Lease, M.L. No. 07/1961,
81/1991, 22/2000, (R), Area 1.3935
Ha., Khase No. 977, Add.-
Bhaislana, Tehsil- Kotputli,
District- Jaipur, (Raj.), (Proposal
No.- 186593)
Name of Proponant :- Dr. Rashmi Patni,
Add.- 5, Jha 30, Jawahar Nagar, Jaipur,
Distt.- Jaipur, (Raj.) Email-
Name of Consultant:- MANTRAS
GREEN RESOURCES LTD
Hall No.- 1 NICE Sankul Plot No.- A-9,
Opp. Nasik Marchant Co Op Bank Ltd, ITI
Signal, MIDCSatpur, Nasik).
email:- [email protected]
53. 19629 Transfer of E C under clause 11 of
EIA notification issued for Masonry
Stone Mining Lease, M.L. No.
471/06, Area 1.0 Ha., Khase No.
376/1/1, 373/1, Add.- Kundala Ki
Dhani, Tehsil- Neem Ka Thana,
District- Sikar, (Raj.), (Proposal
No.- 180508)
Name of Proponant :- M/s Shri- Balaji
Stone Crusher, Add.- 9, Leela Mention,
Raj Bhawan Road, Civil Lines, Jaipur,
Distt.- Jaipur, (Raj.) Email-
Name of Consultant:- MANTRAS
GREEN RESOURCES LTD
Hall No.- 1 NICE Sankul Plot No.- A-9,
Opp. Nasik Marchant Co Op Bank Ltd, ITI
Signal, MIDCSatpur, Nasik).
email:- [email protected]
54. 18073 Environmental Clearance for
“Marble Mineral Mining Project,
Q.L. No.-96/A, Production
Capacity- 2200 TPA, Area-0.0574
ha, Khasra No.- 702, Near Village-
Ullodi Range, Tehsil- Makrana,
Distt.- Nagaur, (Raj.)M/s Mainudeen
and Brothers Makrana.(Proposal
No.-141385)
Name of Proponent: - M/s Mainudeen and
Brothers Makrana, Add.- Village- Makrana,
Tehsil- Makrana, Distt.- Nagaur,
(Raj.)Email –
[email protected] Name of
Consultant: -M/s. N.S. Envro- Tech
Laboratories & Consultant, Add.- Corpo
OFFICE Add Plot No. 69/318, V.T. Road
Chouraha, Madhyam Marg, Mansarovar,
Jaipur (Raj.). Email:-
Final minutes of 4.95th meeting held on 27-29 July, 2021
After examining the documents, information provided and deliberations, the committee
decided to
1. Recommend to SEIAA for grant of EC to proposals listed at serial no. 4, 6, 7, 8, 12,
13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23, 24, 25, 26, 28, 29, 30, 31, 34, 35, 37, 38, 39,
40, 43, 44, 46, 47, 49, 50, 51, 54, ad1, ad2, ad3, ad4, ad5, ad6, ad7 with appropriate
conditions as recommended in the detailed minutes of the respective agenda items.
2. Recommend to SEIAA to close & delist the proposals listed at serial no. NIL.
3. Recommend to SEIAA for amendment in EC/ToR granted/change in name for
proposals listed at serial no. NIL with appropriate conditions as recommended in the
detailed minutes of the respective agenda items.
4. Recommend to SEIAA for grant of ToR to the proposals listed at serial no. 36 as
recommended in the detailed minutes of the respective agenda items.
5. Defer the proposals listed at Serial no. 1, 2, 3, 5, 9, 10, 11, 32, 42, 53, to be consider
in subsequently proposed meetings after receipt of the request from Project Proponent
/Consultant
6. Issue query/seek additional information with respect to the proposals listed at serial
no. 27, 33, 41, 45, 48, to be reexamined in the forthcoming meetings of the SEAC
upon receipt of the reply from PP/consultant.
7. Issue the warning letter to Project Proponent/ Consultant of the proposals listed at
Serial no. NIL .
8. Issue the ToR letter to Project Proponent/ Consultant of the proposals listed at Serial
no. NIL.
The detailed minutes with respect to the agenda items are as annexed. The meeting ended
with thanks to the Chair.
S. No. Name Designation
1 Manoj Kumar Agrawal Chairman
2 Suja George Vice Chairman
3 Pushakar Singh Shekhawat Member
4 Mukesh Behari Sharma Member
5 Laxmi Kant Dashora Member
6 Buddhi Prakash Pareek Member
7 Vikram Singh Chauhan Member
8 Nand Kumar Khare Co-opted Member
9 Rajneesh Jain Member Secretary
Final minutes of 4.95th meeting held on 27-29 July, 2021
Agenda no. 01. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(15817)/ 2019-20
Project Name- Final EIA EMP Report for Environmental Clearance of limestone (Minor
Mineral ) Production Capacity From 14,600 TPA to 15,00,000 TPA (Lime stone burning )
M.L no-122/91, Area-100.00Ha., By M/s Nitesh mineral Pvt. Ltd location at village
Hariyadhana, Tehsil- bilara, dist- Jodhpur(Raj.) (Proposal no-30615).
Project Proponent Name- M/S. Nitesh Minerals Pvt. Ltd, Add-Old public park Road, near
K.N.collage, Rai ka Bagh Jodhpur (Rajasthan), [email protected],
Consultant Name- Udaipur Min-Tech PVT.LTD., Add-206, Apeksha Complex.Sec-
11.Hiran Magri, Udaipur (Raj), [email protected].
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 02. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(264)/ 2019-20
Project Name- Final EIA EMP Report for EC of Chechat Limestone Building Stone mine
over an area of :24.2350 Ha, ML NO-24/93 Production Capacity from 40305 TPA to
300000 TPA. Near Village- Chechat, Tehail- Ramganjmandi, District- Kota, Rajasthan in
favor of M/S Shiva Stone.(Proposal No-60416)
Project Proponent Name- M/S SHIVA STONE ,In Front of RSEB, Near Hotel
Indraprastha, NH-12,JhalawarRajasthan,[email protected].
Consultant Name- EIA CONSULTANT, M/s UDAIPUR MINE-TECH PVT. LTD.
206,APEKSHA COMPLEX. SEC-11.,HIRAN MAGRI, UDAIPUR,(RAJ) Email:-
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 03. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(16951)/ 2019-20
Project Name- Final EIA EMP Report for Environmental Clearance of “Limestone
(Dimensional) & Masonry Stone (Kali Chat), Ref. No. 2019100004792, Area 4.00
ha.(cluster area 48.00 Ha), Production capacity - 404736 TPA Near Village Pipliya
(Runji),Tehsil Pachpahar, District Jhalawar, (Raj). Khasra No. 653, 284, 287, 289, 290, 291,
292, (Proposal No. 62668)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Project Proponent Name Shri Pukhraj Jain,Add- “Miraya Mension”Opposite RSEB, Near
Indraprasth Hotel, Tehsil Jhalrapatan, District Jhalawar, (Raj.).Email – [email protected]
Consultant Name- M/s Udaipur Min- Tech Pvt. Ltd.206, Apeksha Complex. Sec-11. Hiran
Magri, Udaipur, (Raj.).email:[email protected],
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 04. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19623)/ 2019-20
Project Name- EC for Golpur Sandstone Mining Project, Plot No. 32, Area 1.00 Ha.,
production capacity- 73,114.3 TPA (ROM), Khasra No. 369/5, Add.- Golpur, Tehsil- Bundi,
District- Bundi, (Raj.) (Proposal No.- 216092).
Project Proponent Name- Shri- Preetam Singh Bhadoriya S/o Shri- Harendra Singh
Bhadoriya, Add.- Behind Star Public School, Govind Nagar Road, Prem Nagar 1, Kota,
District- Kota, (Raj.), Email- [email protected].
Consultant Name- P AND M SOLUTION, Add.- Shivani mines & Minerals, B-39, RIICO,
Housing Colony, Beawar, Distt.- Ajmer (Raj.) Email.- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.(in
Schedule):
1(a) B2
2. Location of Project Village - Golpur , Tehsil- Bundi , District - Bundi (Raj.
Pillar Latitude Longitude
A 25° 16’ 01.81950'' 75° 27' 14.20923”
B 25° 15’ 58.56989'' 75° 27' 14.19715”
C 25° 15’ 58.58086'' 75° 27' 10.62346”
D 25° 16’ 01.83048'' 75° 27' 10.63552”
3. Project Details
Plot No. /Production
capacity
Plot No.- 32
Area - 1.00Hect
Khasra No.- 369/5
Production (TPA) - 73114.3 TPA (ROM)
4. Project Cost: Rs. 0.50 Cr./-
5. Water Requirement
& Source
Total water requirement is about 4.0 KLD = 1.0 KLD (Drinking
& Domestic Uses) + 1.0 KLD (Plantation + 1.0 KLD Dust
Suppression) + 1.0 (Wet Drilling). Water for Drinking, dust
Final minutes of 4.95th meeting held on 27-29 July, 2021
suppression and plantation will be collected from nearby villages
by water tanker & PHED
6. Fuel & Energy:- Only diesel will be required to run vehicles for transportation.
7. Application No. & Date
& documents submitted :-
Proposal No.: SIA/RJ/MIN/216092/2021
Online Application Date: 22 Jun 2021
SEAC File No.: 19623
8. Information about
Aravalli Certificate.
This ML area does not fall in Aravalli ranges. Aravalli Certificate was
issued by Mining Engineer, Bundi vide letter no.
ME/Bundi/Map/2021/290 Dated 03/03/2021.
(Aravalli Certificate is enclosed with this proposal)
9. Date of Air/Water/Noise
Monitoring
Date of Monitoring
Monitoring Reports are enclosed with this proposal.
10. Information about 500
mts composite map
500 mts composite map with Cluster Certificate is enclosed with this
proposal which was issued by Mining Engineer, Bundi. Composite map
issued vide letter no. ME/Bundi/Map/2021/291 Dated 03/03/2021 &
Cluster certificate issued vide letter no ME/Bundi/Map/2021/291 Dated
03/03/2021. Area falling within 500 mts 1.58559 ha. excluding this mine
area.
(500m composite map & cluster certificate are enclosed with this
proposal).
11. Environment
Management Plan
Expenditure of EMP Rs 2,50,000/-
S.
No. Measures
Expenditure Cost
in Rs. (Fixed)
Expenditure Cost
in Rs. (Recurring)
(Per Year)
1
Pollution Control
i) Dust
Suppression &
Wet Drilling &
Others
30,000/- 80,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
2
Pollution
Monitoring
i) Air pollution
ii)Water pollution
-- 20,000/-
3 Green Belt 1,00,000/- 1,50,000/-
Total 1,30,000/- 2,50,000/-
12. CSR /ESR Activates As Per MoEF OM F. No. 22-65/2017-IA.III Dated 30.09.2020, CER
activity will be part of Environment Management plan instead of
allocation of funds under CER.
13. Green Belt/ Plantation Expenditure of Green Belt Rs 1,50,000/-
Total green belt will be the 33% of the ML area 0.33 ha of the area will be
planted in khasra no 369/5 land provided by gram Panchayat Golpur. Total
330 trees will be planted over an area of 0.33 ha in Charagah land allotted
by gram panchayat. It is proposed to invest 1.50 Lac Rs. Per Annum for
Green Belt Development.
Plan for Afforestation
Year Saplings Species
Place of Plantation
Existing - Neem, Babool,
Pipal, Kair,
Sheesham,
Gulmohar etc. etc.
Charagah land near lease
area gram Golpur, Tehsil
& Dist. Bundi
I Year
110
II Year
110
III Year
110
Total
(As per the MoEF & CC Office Memorandum Dated 16th January, 2020
“The mining lease holders Shall after ceasing mining Operations,
undertake re-grassing the mining area and any other area which may have
been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
The lessee shall comply all conditions as per Office Memorandum
16/1/2020.)
14. Budgetary Breakup for
Labour
Expenditure of Labour Rs 50,000/-
Sl.
No. Scheme
Expenditure
Cost in Rs.
(Fixed)
Expenditure
Cost in Rs.
(Recurring)
(Per Year)
Final minutes of 4.95th meeting held on 27-29 July, 2021
1 Drinking water facility 5,000/- 10,000/-
2
Health Facility (First aid
box, Rest shelter,
Medicine & Washroom)
& Insurance
5,000/- 10,000/-
3 Education for children
etc. 5,000/- 10,000/-
4
Safety equipment like
Ear plug, Dust mask,
hand gloves, Safety
Shoes etc.
10,000/- 20,000/-
Total 25,000/- 50,000/-
15. Present Status :- LOI Granted (This is a fresh applied ML area. Mining Operations will be
started after Environment Clearance & Consent to operate)
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Golpur Sandstone Mining Project, Plot
No. 32, Area 1.00 Ha., production capacity- 73,114.3 TPA (ROM), Khasra No. 369/5, Add.-
Golpur, Tehsil- Bundi, District- Bundi, (Raj.) (Proposal No.- 216092). The project is
covered under B2 category. The SME, Kota vide order dated 16.12.2020 has issued LoI to the
PP for mining of Sandstone. The mining plan has been approved by the SME, Kota vide letter
dated 16.04.2021. ME, Bundi in his certificate dated 03.03.2021 has stated that the mining
lease does not fall in Aravalli hills. DCF, MNP, Kota in his letter dated 24.02.2021 has stated
that the MHTR is at a distance of 26.11 Km from applied lease. DCF, WL, Kota in his letter
dated 16.06.2021 has advised that PP could find out the distance of Ramgarh Vishdhari WLS
from KML file at his level. PP has mentioned in Form-1 that Ramgarh Vishdhari WLS is at a
distance of 25.61 Km from the applied lease area and this distance was found by the SEAC to
be correct from KML file as shown during presentation. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 03.03.2021 issued by ME, Bundi. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri Preetam
Singh Bhadoriya S/o Shri- Harendra Singh Bhadoriya, for Golpur Sandstone Mining Project
Final minutes of 4.95th meeting held on 27-29 July, 2021
Plot No. 32, Area 1.00 Ha., production capacity- 73,114.3 TPA (ROM), Khasra No. 369/5,
Add.- Golpur, Tehsil- Bundi, District- Bundi, (Raj.) (Proposal No.- 216092), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent: Shri- Preetam Singh Bhadoriya S/o Shri- Harendra
Singh Bhadoriya, Add.- Behind Star Public School, Govind Nagar Road, Prem Nagar 1,
Kota, District- Kota, (Raj.), Email- [email protected], Consultant Name:- P AND
M SOLUTION, Add.- Shivani mines & Minerals, B-39, RIICO, Housing Colony, Beawar,
Distt.- Ajmer (Raj.), Email.- [email protected].
Agenda no. 05. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19631)/ 2019-20
Project Name- EC for Khananiya Khera Quartz & Feldspar Mine M.L. No. 81/2002, Area
5.00 Ha., Khasra No. 522, 530, 531, 529, 528, 527, 534,535,541, 538, 540, 539, 536,
Production capacity: 1,12,398 TPA (ROM) {Saleable minerals: 67,438 TPA,
Subgrade:11,240 TPA, Waste: 33,720 TPA}, Add.- Khananiya Khera, Tehsil- Raipur,
District- Bhilwara, (Raj.) (Proposal No.- 208561).
Project Proponent Name Mr. Shabbur Ahmad S/o Mr. Fakhruddin Sheikh, Add.- Regaron
Ki Kui, Tehsil- Asind, District- Bhilwara, (Raj.) Email-
Consultant Name- P AND M SOLUTION, Add.- Shivani mines & Minerals, B-39, RIICO,
Housing Colony, Beawar, Distt.- Ajmer (Raj.), Email.- [email protected]
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 06. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19602)/ 2019-20
Project Name- EC for Masonry Stone Mining Project, Plot No. 3, Area 1.00 Ha.,
Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340, Add.- Ramgarh Padli bad,
Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 208038).
Project Proponent Name- Shri- Ramavtar Sharma S/o Shri- Kundan Ram Sharma, Add.-
191/27, Sector-19, Pratap Nagar, Sanganer, Jaipur, Distt.- Jaipur, (Raj.), Email-
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email. –
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category/Item No. (In Schedule) 1(a) B2
Final minutes of 4.95th meeting held on 27-29 July, 2021
2. Location of Project Near village – Ramgarh, Padlibad, Tehsil - Sikrai,
District-Dausa (Rajasthan)
3. Project Details Plot No. – 3,
Area – 1.00Ha.
Khasra No. 957, 340
Production in TPA – Masonry Stone @ 100000 TPA
4. Project Cost Rs. 25 Lakh.
5. Water Requirement & Source 5.0KLD (Tanker supply from near village Ramgarh)
6. Fuel & Energy 300 Liter/day Fuel will be required for mining.
7. Application No. & Date &
Documents Submitted
Application No. : 19602
Online Submission Date:-06.04.2021
8. Information about Aravalli
Certificate
Aravalli certificate issued, vide letter no. AME/DAUSA/
Minor/Plot/02/2019/62 dated 30.03.2021.
9. Date of
Air/Water/Noise/Monitoring
Air/Water/Noise/Soil monitoring has been carried out on
17/06/2021.
10. Information about 500mts
Composite Map
Letter No. - AME/DAUSA/ Minor/Plot/02/2019/63 dated
30.03.2021.
11. Environment Management Plan Total Annual expenditure of EMP is Rs. 1,80,000/- per
year. Details are follow:
S.No Description of Item Amount (in Rs/yr.)
1. Annual Monitoring 1,00,000/-
2. Green Belt development 30,000/-
3. Water Sprinkling on haul roads
50,000/-
Total 1,80,000/-
12. CSR/ESR Activities
Total Annual expenditure of CSR/ESR is Rs. 50,000/- per year. Details are follow:
Year Name of Location Head Quantity Cost
I Year Govt. School,
Padlibad, Ramgarh,
Tehsil - Sikrai, District-Dausa,
Rajasthan
Water Cooler & Synthetic Tank &
AMC
Renovation & Repairing Work Furniture as Chairs & Tables
1
- 5+5
20,000/-
15,000/- 15,000/-
II Year LED Bulb/Tube light + Fan
Library Books, Sports kit & accessories as Football, Cricket,
Basket Ball etc.
10+10
-
20,000/-
30,000/-
III Year Computer with Printer, Almari (Steel) 1+1 50,000/-
IV Year Gram Panchayat of
Village - Padlibad, Ramgarh, Tehsil -
Sikrai, District-
Dausa, Rajasthan
Construction and maintenance of
village roads adjacent to project site
- 50,000/-
V Year Periodically medical checkup camps, blood donation camps. Eye checkup
camps
Health awareness camps for child and mother care, health and hygiene
practices
- -
20,000/- 20,000/-
10,000/-
The PP shall expenditure Rs. 50,000/- per year for CER. The above expenditure is for 5 years,
the onwards the PP shall be expend the amount of CER as per need of local stack holders/Govt.
Final minutes of 4.95th meeting held on 27-29 July, 2021
School/Hospitals & Gram Panchyat etc.
13. Green
Belt/Plantation
Year Un-worked
Area
Govt. Girls
High
Secondary
School,
Kalwan
Backfilled
(Reclaimed
Area)
Top soil
Dumps
Total
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Existing - - - - - - - - - -
1st 0.10 100 0.015 15 0.115 115
2nd 0.10 100 0.015 15 0.115 115
3rd 0.085 85 0.015 15 0.100 100
4th Maintenance
5th Maintenance
Total 0.285 285 0.045 45 0.330 330
Note: As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after
ceasing mining operations, undertake re-grassing the mining area and any other
area which may have been disturbed due to their mining activities and restore
the land to a condition which is fit for growth of fodder, flora, fauna etc.
Note: - At the end of third year Green Belt/Plantation will be done in 0.330 ha.
area i.e. (330 trees) (0.285 ha + 0.045 ha.) out of which 0.285 ha.(285 Plants) area will be covered under green belt on around the mine periphery & remaining i.e.
0.045 ha. (45 Plants) Plantation will be done outside the lease area in village
Kalwan in Govt. Girls High Secondary School. Native species which are more suitable to the local environment are preferred to be
planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool
(Acacia nilotica), Kher (Acacia catechu) etc.
Source-Approved Mining Plan with Progressive Mine closure plan
Final minutes of 4.95th meeting held on 27-29 July, 2021
14. Budgetary Breakup for Labour
Total Annual expenditure for labours is Rs. 60,000/- per year. Details are follow:
Sr. No. Description Amount (in Rs./yr.)
1 Rest Shelter 10,000
2 Drinking water facility 10,000
3 Bio-Toilet Facility 30,000
5 Medical facility for labors 10,000
Total 60,000
15. Present Status This is Fresh mining lease of mineral Masonry Stone,
located near village - Ramgarh, Padlibad, Tehsil - Sikrai,
District-Dausa, Rajasthan
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Masonry Stone Mining Project, Plot
No. 3, Area 1.00 Ha., Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340,
Add.- Ramgarh Padli bad, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 208038).
The project is covered under B2 category. The SME, Jaipur vide order dated 05.08.2020 has
issued LoI to the PP for mining of Masonry Stone. The mining plan has been approved by the
SME, Jaipur vide letter dated 30.03.2021. AME, Dausa in his certificate dated 30.03.2021 has
stated that the mining lease does not fall in Aravalli hills. DCF, Dausa in his certificate dated
26.07.2021 has stated that there is no Wildlife Sanctuary/National Park/ Conservation
Reserve within 10 km periphery of the mine. The project does not involve approval/
clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as
no forest land is involved and neither there is any Wild Life Sanctuary/ National Park within
10 Km from the project site.
As per cluster certificate issued by AME, Dausa on 30.03.2021, the total area of all the
mining leases in the cluster having area of 3.3774 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation resolved to recommend to SEIAA for grant of EC to Shri-
Ramavtar Sharma S/o Shri- Kundan Ram Sharma, for Masonry Stone Mining Project, Plot
No. 3, Area 1.00 Ha., Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340,
Add.- Ramgarh Padli bad, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 208038),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent Shri- Ramavtar Sharma S/o Shri- Kundan
Ram Sharma, Add.- 191/27, Sector-19, Pratap Nagar, Sanganer, Jaipur, Distt.- Jaipur,
Final minutes of 4.95th meeting held on 27-29 July, 2021
(Raj.), Email- [email protected], Consultant Name:- Globus Environment
Services, Add.- 326-AB, 3rd Floor, Sahara Shopping Center, Lekhraj Crossing, Faizabad
Road, Lucknow (U.P.) Email– [email protected].
Agenda no. 07. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19603)/ 2019-20
Project Name- EC for Masonry Stone Mining Project, Plot No. 02, Area 1.3774 Ha.,
Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340, 171, Add.- Ramgarh
Geejgarh Padli bad, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 207955).
Project Proponent Name- Shri- Ramavtar Sharma S/o Shri- Kundan Ram Sharma, Add.-
191/27, Sector-19, Pratap Nagar, Sanganer, Jaipur, Distt.- Jaipur, (Raj.), Email-
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email.–
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category/Item No. (In Schedule) 1(a) B2
2. Location of Project Near village – Ramgarh, Geejgarh, Padlibad, Tehsil -
Sikrai, District-Dausa (Rajasthan)
3. Project Details Plot No. – 2,
Area – 1.3774Ha.
Khasra No. 957, 340, 171 (Govt. Land & Charagah Land)
Production in TPA – Masonry Stone @ 100000 TPA
4. Project Cost Rs. 25 Lakh.
5. Water Requirement & Source 5.0KLD (Tanker supply from near village Ramgarh)
6. Fuel & Energy 300 Liter/day Fuel will be required for mining.
7. Application No. & Date &
Documents Submitted
Application No. : 19603
Online Submission Date:-05.04.2021
8. Information about Aravalli
Certificate
Aravalli certificate issued, vide letter no. AME/DAUSA/
Minor/Plot/02/2019/65 dated 30.03.2021.
9. Date of
Air/Water/Noise/Monitoring
Air/Water/Noise/Soil monitoring has been carried out on
17/06/2021.
10. Information about 500mts
Composite Map
Letter No. - AME/DAUSA/ Minor/Plot/02/2019/66 dated
30.03.2021.
11. Environment Management Plan Total Annual expenditure of EMP is Rs. 1,80,000/- per
year. Details are follow:
S.No Description of Item Amount (in Rs/yr.)
1. Annual Monitoring 1,00,000/-
2. Green Belt development 30,000/-
3. Water Sprinkling on haul
roads 50,000/-
Total 1,80,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
12. CSR/ESR Activities
Total Annual expenditure of CSR/ESR is Rs. 50,000/- per year. Details are follow:
Year Name of Location Head Quantity Cost
I Year Govt. School,
Ramgarh, Geejgarh, Padlibad, Tehsil -
Sikrai, District-
Dausa, Rajasthan
Water Cooler & Synthetic Tank &
AMC Renovation & Repairing Work
Furniture as Chairs & Tables
1
-
5+5
15,000/-
15,000/-
20,000/-
II Year LED Bulb/Tube light + Fan Library Books, Sports kit &
accessories as Football, Cricket,
Basket Ball etc.
10+10 -
20,000/- 30,000/-
III Year Computer with Printer, Almari (Steel) 1+1 50,000/-
IV Year Gram Panchayat of Village - Ramgarh,
Geejgarh, Padlibad,
Tehsil - Sikrai,
District-Dausa, Rajasthan
Construction and maintenance of village roads adjacent to project site
- 50,000/-
V Year Periodically medical checkup camps,
blood donation camps. Eye checkup
camps Health awareness camps for child and
mother care, health and hygiene
practices
-
-
15,000/-
15,000/-
20,000/-
The PP shall expenditure Rs. 50,000/- per year for CER. The above expenditure is for 5 years, the
onwards the PP shall be expend the amount of CER as per need of local stack holders/Govt.
School/Hospitals & Gram Panchyat etc.
13. Green
Belt/Plantation
Year Un-worked
Area
Govt. Girls
High
Secondary
School,
Kalwan
Backfilled
(Reclaimed
Area)
Top soil
Dumps
Total
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Existing - - - - - - - - - -
1st 0.11 110 0.0415 41 0.1515 151
2nd 0.11 110 0.0415 42 0.1515 152
3rd 0.1104 110 0.0420 42 0.1524 152
4th Maintenance
5th Maintenance
Total 0.3304 330 0.125 125 0.4554 455
Note: As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after
ceasing mining operations, undertake re-grassing the mining area and any other
area which may have been disturbed due to their mining activities and restore the
land to a condition which is fit for growth of fodder, flora, fauna etc.
Note: - At the end of third year Green Belt/Plantation will be done in 0.4554 ha. area
i.e. (455 trees) (0.3304 ha + 0.125 ha.) out of which 0.3304 ha.(330 Plants) area will be covered under green belt on around the mine periphery & remaining i.e. 0.125 ha.
(125 Plants) Plantation will be done outside the lease area in village Kalwan in Govt.
Girls High Secondary School.
Native species which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool
(Acacia nilotica), Kher (Acacia catechu) etc.
Source-Approved Mining Plan with Progressive Mine closure plan
Final minutes of 4.95th meeting held on 27-29 July, 2021
14. Budgetary Breakup for Labour
Total Annual expenditure for labours is Rs. 60,000/- per year. Details are follow:
Sr. No. Description Amount (in Rs./yr.)
1 Rest Shelter 10,000
2 Drinking water facility 10,000
3 Bio-Toilet Facility 30,000
5 Medical facility for labors 10,000
Total 60,000
15. Present Status This is Fresh mining lease of mineral Masonry Stone,
located near village - Ramgarh, Geejgarh, Padlibad, Tehsil -
Sikrai, District-Dausa, Rajasthan
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Masonry Stone Mining Project, Plot No.
02, Area 1.3774 Ha., Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340, 171,
Add.- Ramgarh Geejgarh Padli bad, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.-
207955). The project is covered under B2 category. The SME, Jaipur vide order dated
05.08.2020 has issued LoI to the PP for mining of Masonry Stone. The mining plan has been
approved by the SME, Jaipur vide letter dated 30.03.2021. AME, Dausa in his certificate
dated 30.03.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Dausa
in his certificate dated 19.04.2021 has stated that there is no Wildlife Sanctuary/National
Park/ Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
As per cluster certificate issued by AME, Dausa on 30.03.2021, the total area of all
the mining leases in the cluster having area of 3.3774 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Ramavtar Sharma S/o Shri- Kundan Ram Sharma, for Masonry Stone Mining Project, Plot
No. 02, Area 1.3774 Ha., Production Capacity- 1,00,000 TPA (ROM), Khasra No. 957, 340,
171, Add.- Ramgarh Geejgarh Padli bad, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal
No.- 207955), with the stipulation that the PP shall abide by the annual production scheduled
specified in mining plan and that any deviation there in will render the PP liable for legal
action in accordance with Environment and Mining Laws, with the specific and general
conditions annexed at Annexure ‘A’. Name of Proponent Shri- Ramavtar Sharma S/o Shri-
Kundan Ram Sharma, Add.- 191/27, Sector-19, Pratap Nagar, Sanganer, Jaipur, Distt.-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Jaipur, (Raj.), Email- [email protected], Consultant Name:- Globus Environment
Services, Add.- 326-AB, 3rd Floor, Sahara Shopping Center, Lekhraj Crossing, Faizabad
Road, Lucknow (U.P.), Email.– [email protected].
Agenda no. 08. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19618)/ 2019-20
Project Name- EC for Masonry Stone Mining Project, Plot No. 05/2019, Area 1.8827 Ha.,
Production Capacity- 2,50,000 TPA (ROM), Khasra No. 134, Add.- Kalwan, Tehsil- Sikrai,
District- Dausa, (Raj.) (Proposal No.- 199978).
Project Proponent Name- Shri- Rajendra Prasad Sharma S/o Shri- Rameshwar Prasad
Sharma, Add.- Kuiwali Dhani, Raipura, Sikrai, Distt.- Dausa, (Raj.) Email-
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email. –
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category/Item No. (In Schedule) 1(a) B2
2. Location of Project Near village – Kalwan, Tehsil - Sikrai, District-Dausa,
Rajasthan
3. Project Details Plot No. – 5/2019,
Area – 1.8827Ha.
Khasra No. 134 (Govt. Land)
Production in TPA – Masonry Stone @ 250000 TPA
4. Project Cost Rs. 25 Lakh.
5. Water Requirement & Source 5.0KLD (Tanker supply from near village Kalwan)
6. Fuel & Energy 300 Liter/day Fuel will be required for mining.
7. Application No. & Date &
Documents Submitted
Application No. :
Online Submission Date:-25.03.2021
8. Information about Aravalli
Certificate
Aravalli certificate issued, vide letter no. AME/DAUSA/
Minor/Plot/05/2019 dated 22.02.2021.
9. Date of
Air/Water/Noise/Monitoring
Air/Water/Noise/Soil monitoring has been carried out on
17/06/2021.
10. Information about 500mts
Composite Map
Letter No. - AME/DAUSA/ Minor/Plot/05/2019/32 dated
22.02.2021.
11. Environment Management Plan Total Annual expenditure of EMP is Rs. 1,80,000/- per
year. Details are follow:
S.No Description of Item Amount (in Rs/yr.)
1. Air Pollution Control -
Water Sprinkling 1,00,000/-
2. Environmental Monitoring
and Management 30,000/-
3. Green Belt Development 50,000/-
Total 1,80,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
12. CSR/ESR Activities
Total Annual expenditure of CSR/ESR is Rs. 50,000/- per year. Details are follow:
Year Name of Location Head Quantity Cost
I Year Govt. School,
Kalwan, Tehsil - Sikrai, District-
Dausa, Rajasthan
Water Cooler & Synthetic Tank &
AMC Renovation & Repairing Work
Furniture as Chairs & Tables
1
-
5+5
20,000/-
15,000/-
15,000/-
II Year LED Bulb/Tube light + Fan Library Books, Sports kit &
accessories as Football, Cricket,
Basket Ball etc.
10+10 -
15,000/- 35,000/-
III Year Computer with Printer, Almari (Steel) 1+1 50,000/-
IV Year Gram Panchayat of Village - Kalwan,
Tehsil - Sikrai,
District-Dausa,
Rajasthan
Construction and maintenance of village roads adjacent to project site
- 50,000/-
V Year Periodically medical checkup camps,
blood donation camps. Eye checkup
camps Health awareness camps for child and
mother care, health and hygiene
practices
-
-
15,000/-
15,000/-
20,000/-
The PP shall expenditure Rs. 50,000/- per year for CER. The above expenditure is for 5 years, the
onwards the PP shall be expend the amount of CER as per need of local stack holders/Govt.
School/Hospitals & Gram Panchyat etc.
13. Green
Belt/
Plantation
Year Un-worked
Area
Near area of
Shamshan
Ghat in
Kalwan
Backfilled
(Reclaimed
Area)
Top soil
Dumps
Total
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Area
(Ha.)
No. of
Plants
Existing - - - - - - - - - -
1st 0.20 200 0.007 7 0.207 207
2nd 0.20 200 0.007 7 0.207 207
3rd 0.1993 199 0.008 8 0.2073 207
4th Maintenance
5th Maintenance
Total 0.5993 599 0.022 22 0.6213 621
Note: As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which
may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
Note: - At the end of third year Green Belt/Plantation will be done in 0.6213 ha. area i.e.
(621 trees) (0.5993 ha + 0.022 ha.) out of which 0.5993 ha.(599 Plants) area will be
covered under green belt on around the mine periphery & remaining i.e. 0.022 ha. (22 Plants) Plantation will be done outside the lease area in village Kalwan in Near area of
Shamshan Ghat.
Native species which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool (Acacia
nilotica), Kher (Acacia catechu) etc. Source-Approved Mining Plan with Progressive Mine closure plan
Final minutes of 4.95th meeting held on 27-29 July, 2021
14. Budgetary Breakup for Labour
Total Annual expenditure for labours is Rs. 60,000/- per year. Details are follow:
Sr. No. Description Amount (in Rs./yr.)
1 Rest Shelter 10,000
2 Drinking water facility 10,000
3 Bio-Toilet Facility 30,000
5 Medical facility for labors 10,000
Total 60,000
15. Present Status This is Fresh mining lease of mineral Masonry Stone,
located near village - Kalwan, Tehsil - Sikrai, District-
Dausa, Rajasthan
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Masonry Stone Mining Project, Plot
No. 05/2019, Area 1.8827 Ha., Production Capacity- 2,50,000 TPA (ROM), Khasra No.
134, Add.- Kalwan, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 199978). The
project is covered under B2 category. The SME, Jaipur vide order dated 04.02.2021 has
issued LoI to the PP for mining of Masonry Stone. The mining plan has been approved by the
SME, Jaipur vide letter dated 30.03.2021. AME, Dausa in his certificate dated 22.02.2021 has
stated that the mining lease does not fall in Aravalli hills. DCF, Dausa and in his certificate
dated 19.04.2021 has stated that there is no Wildlife Sanctuary/National Park/ Conservation
Reserve within 10 km periphery of the mine. The project does not involve approval/
clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as
no forest land is involved and neither there is any Wild Life Sanctuary/ National Park within
10 Km from the project site.
According to cluster certificate issued by AME, Dausa on 22.02.2021, total area of all
the mining leases in the cluster is less than 5.0 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri Rajendra
Prasad Sharma S/o Shri- Rameshwar Prasad Sharma for Masonry Stone Mining Project, Plot
No. 05/2019, Area 1.8827 Ha., Production Capacity- 2,50,000 TPA (ROM), Khasra No. 134,
Add.- Kalwan, Tehsil- Sikrai, District- Dausa, (Raj.) (Proposal No.- 199978), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent Shri- Rajendra Prasad Sharma S/o Shri- Rameshwar
Prasad Sharma, Add.- Kuiwali Dhani, Raipura, Sikrai, Distt.- Dausa, (Raj.), Email-
Final minutes of 4.95th meeting held on 27-29 July, 2021
[email protected], Consultant Name:-. Globus Environment Services, Add.-
326-AB, 3rd Floor, Sahara Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow
(U.P.) Email. –[email protected].
Agenda no. 09. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19619)/ 2019-20
Project Name- EC for Sand Stone Mining Project, Q.L. No. 2192, Area 0.18 Ha., Khasra
No. not given, Production Capacity- 3700 TPA (ROM) Add.- Keru, Tehsil- Jodhpur,
District- Jodhpur, (Raj.) (Proposal No.- 208590).
Project Proponent Name: Shri- Ghanshyam Prajapati S/o Shri- Peeramal Prajapati, Add.-
Near Sankatmochan Balaji Temple Duliya Bas, Sujangarh, Churu, Distt.- Churu, (Raj.),
Email- [email protected].
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email. –
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 10. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(18798)/ 2019-20
Project Name- EC for Sandstone Mining Project, Ref. No. 20191000014379, Area 1.877
Ha., Khasra No. 352/4, 352/7, 352/9, 352/10, Productoin Capacity 150000 TPA
(ROM){Sandstone : 135000 TPA,Waste: 15000TPA}Add.- Badli, Tehsil- Jodhpur, District-
Jodhpur, (Raj.) (Proposal No.- 62792).
Project Proponent Name- Smt.-Narbada Kachhawaha W/o Shri- Panna Lal Kachhawaha,
Add.- Kishan Service Center, Pratap Nagar, Soorsagar Road, Jodhpur, Distt.- Jodhpur,
(Raj.) Email- [email protected].
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email. –
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 11. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1( 18799)/ 2019-20
Project Name- E C for Sandstone Mining Project" Ref. No. 2019100004382, Area 1.4658
Ha., Khasra No. 348/01, Productoin Capacity 110000 TPA (ROM){Sandstone : 99000
Final minutes of 4.95th meeting held on 27-29 July, 2021
TPA,Waste: 11000 TPA} Add.- Badli, Tehsil- Jodhpur, District- Jodhpur, (Raj.) (Proposal
No.- 62778).
Project Proponent Name- Shri-Pukhraj Gehlot S/o Shri- Ramchandra Gehlot, Add.- Gali
No. 1, Kheme Ka Kua, Pal road, Distt.- Jodhpur, (Raj.) Email-
Consultant Name- Globus Environment Services, Add.- 326-AB, 3rd Floor, Sahara
Shopping Center, Lekhraj Crossing, Faizabad Road, Lucknow (U.P.) Email. –
Observations and Resolution of the committee:-
The PP vide letter dated 27.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 12. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19606)/ 2019-20
Project Name- EC for Masonry Stone (Crusher Gitti) Mining Project, Ref. No. 202010000
28711, M.L. No. 09/2020, Area 1.0427 Ha., Production Capacity 1,09,650 TPA (ROM)
{Saleable masonry stone: 1,04,169 TPA, Waste: 5481 TPA}, with stone crusher having
production capacity of 150 TPH, Khasra No. 922, Add.- Kesunda, Tehsil- Chhoti Sadri,
District- Pratapgarh, (Raj.) (Proposal No.- 214422).
Project Proponent Name- Shri- Labhachand Meghwal S/o Shri- Gotam Lal Meghwal,
Add.- Kesunda, Tehsil- Chhoti Sadri, Distt.- Pratapgarh, (Raj.) Email-
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no. (in
Schedule):
1 (a) /Category-B2
2. Location of
Project Near Village- Kesunda, Tehsil- Chhoti Sadri & District- Pratapgarh (Raj.)
Khasra No. 922
3. Project Details
REF.
No./Production
capacity
Ref. No. 20201000028711, Area- 1.0427 ha
Proposed Crusher capacity: 150 TPH
Proposed Production capacity: 1,09,650 TPA (R.O.M.)
(Production of saleable Masonary Stone: 1,04,169 TPA, Waste: 5,481 TPA)
4. Project Cost Rs. 1.50 Crore
5. Water
Requirement & Source
Total Water Requirement-2.36 KLD
Source: Water will be made available from nearby village Kesundavia water tanker supply.
6. Fuel &Energy: - Diesel operated machinery will be used and will be taken care by the contractor itself. If
required Electricity connection will be taken from concerned electricity department.
Final minutes of 4.95th meeting held on 27-29 July, 2021
7. Application No. & Date &
documents
submitted: -
Online Proposal No. SIA/RJ/MIN/214422/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents for
grant of EC have been submitted.
8. Information about
Aravalli
Certificate.
Aravalli Certificate was issued by ME, Pratapgarh vide letter no. ME/Pratap/CC-minor/ML
09/2020/2020-21/550 dated 01/04/2021.
9. Date of
Air/Water/Noise
Monitoring
Date of Air Monitoring: - 03/04/2021
Date of Water Sampling: 03/04/2021
Date of Noise Monitoring: 03/04/2021
10. Information about 500 mts
composite map
Cluster certificate was issued by ME, Udaipur vide letter no. ME/Pratap/CC- Minor/M.L.
09/2020/2020-21/549 dated 01/04/2021. No other mine lease are existing within 500 m radius of
the said mine lease area
11. Environment
Management
Plan
Annual Expenditure of Rs 7.50 Lac Per year
S.
No. Particulars
Capital Cost (in Rs Lac)
Recurring
cost
(in Rs. Lac)
1 Air, Water & Noise pollution monitoring -- 1.00
2 Installation of water sprinkling system 2.00 0.10
3 Installation of covered conveyer belts 2.00 0.20
4
Water Requirement (For dust
suppression and green belt/plantation
purpose)
-- 0.90
5 Green belt (including plant cost, tree
guard and its maintenance) -- 0.50
6
Contribution towards construction and
maintenance of the kachha roads after
consultation with the concerned gram Panchayat and local people
-- 0.80
Total 4.00 3.50
12 GreenBelt/
Plantation
Annual expenditure of Rs. 0.50Lac Per Year (Recurring Cost)
Year Un-worked
Area
Outside the mine
lease area in own
khasra land
Top Soil
Dumps Backfilled Area Total
Area (Ha)
No. of Trees
Area (Ha)
No. of Trees
Area (Ha)
No. of Trees
Area (Ha)
No. of Trees
Area (Ha)
No. of Trees
Existing - - - - - - - - - -
I - - 0.1147 114 - - - - 0.1147 114
II - - 0.1148 115 - - - - 0.1148 115
III - - 0.1148 115 - - - - 0.1148 115
IV MAINTENANCE TO BE DONE
V
At the end of life of Mine
- - - - - - - - - -
Total - - 0.3443 344 - - - - 0.3443 344
Note:Total 344 saplings will be planted over an area of 0.3443 ha (33% of the mine lease area)
which will be planted outside the mine lease in own khasra no. 736, 744 &745 and it will be
ensured that after ceasing mining operations re-grassing of the mining area and any other area
Final minutes of 4.95th meeting held on 27-29 July, 2021
which may have been disturbed due to the mining activities is done and will restore the land to a condition which is fit for growth of fodder, flora, fauna etc. as per the MoEF & CC O.M vide No.
22-34/2018-IA.III dated 16th Jan 2020.Native species which are more suitable to the local
environment are preferred to be planted such as Khejari, Neem, Pipal, Sheesham, Mango, etc.
13 Budgetary
Breakup for
Labours
Annual Expenditure of Rs. 1.702Lac Per year
Sr.
No. Facility Provided for Laborers
Capital Cost
in Rs. Recurring Cost in
Rs.
1. Shelters, Safe drinking water, Sanitation
facility
1,00,000 Maintenance Cost:
20,000
3. Periodical medical Examination per year @1000 Rs. per labor
18,000
4. Fuel for cooking (LPG Cylinder) @950 Rs.
Per month 9,500
5. Education for children of labors @ 2,400 Rs.
per labor 43,200
6. Group Insurance @1500 Rs. per worker 27,000 -
7.
Provision for personal protection equipment (PPEs) like ear plug, dust mask, Helmet, shoes
etc., for 18 workers
Safety shoes @350 Rs (2 times/year)
Hand Gloves @300 Rs (2 times/year)
Dust mask @25 Rs (2 times in month)
Ear plugs @25 Rs (2 times in month)
Helmets @450 Rs (1 time/years)
12,600
10,800
9,000
9,000
8,100
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,57,000 1,70,200
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application EC for Masonry Stone (Crusher Gitti) Mining
Project, Ref. No. 202010000 28711, M.L. No. 09/2020, Area 1.0427 Ha., Production
Capacity 1,09,650 TPA (ROM) {Saleable masonry stone : 1,04,169 TPA, Waste: 5481
TPA}, with stone crusher having production capacity of 150 TPH, Khasra No. 922, Add.-
Kesunda, Tehsil- Chhoti Sadri, District- Pratapgarh, (Raj.) (Proposal No.- 214422). The
project is covered under B2 category. The SME, Udaipur vide order dated 28.12.2020 has
issued LoI to the PP for mining of Masonry Stone. The mining plan has been approved by the
SME, Udaipur vide letter dated 01.04.2021. ME, Pratapgarh in his certificate dated
01.04.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, WL,
Chittorgarh in his certificate dated 05.03.2021 has stated that the Sitamata WLS is at a
distance of 24.10 Km from the applied lease area. DFO, Neemuch in his certificate dated
23.07.2021 has stated that there is no Wildlife Sanctuary/National Park within 10 km
periphery of the mine.
Final minutes of 4.95th meeting held on 27-29 July, 2021
As per cluster certificate issued by ME, Pratapgarh on 01.04.2021, the total area of all
the mining leases in the cluster having area of 1.0427 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Labhachand Meghwal S/o Shri- Gotam Lal Meghwal for Masonry Stone (Crusher Gitti)
Mining Project, Ref. No. 202010000 28711, M.L. No. 09/2020, Area 1.0427 Ha., Production
Capacity 1,09,650 TPA (ROM) {Saleable masonry stone : 1,04,169 TPA, Waste: 5481
TPA}, with stone crusher having production capacity of 150 TPH, Khasra No. 922, Add.-
Kesunda, Tehsil- Chhoti Sadri, District- Pratapgarh, (Raj.) (Proposal No.- 214422), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Project Name- EC for Masonry Stone (Crusher Gitti) Mining Project, Ref.
No. 202010000 28711, M.L. No. 09/2020, Area 1.0427 Ha., Production Capacity 1,09,650
TPA (ROM) {Saleable masonry stone : 1,04,169 TPA, Waste: 5481 TPA}, with stone
crusher having production capacity of 150 TPH, Khasra No. 922, Add.- Kesunda, Tehsil-
Chhoti Sadri, District- Pratapgarh, (Raj.) (Proposal No.- 214422). Project Proponent
Name- Shri- Labhachand Meghwal S/o Shri- Gotam Lal Meghwal, Add.- Kesunda, Tehsil-
Chhoti Sadri, Distt.- Pratapgarh, (Raj.), Email- [email protected].
Agenda no. 13. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19607)/ 2019-20
Project Name- EC for Granite Mining Project, M.L. No. 30/2021, Plot No. 64, Area 1.0159
Ha., Khasra No. 1767, 1768, 1769, 1770, 1772, 1774, Production Capacity 81,400 TPA
(ROM) {Granite: 48,840 TPA, Waste: 32,560 TPA}, Add.- Mankhand, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal No.- 214058).
Project Proponent Name: Shri- Ugmaram Khichad S/o Shri- Chelaram Khichad, Add.-
Mukam, Post- Seeniya, Ranigaon, Tehsil- Makrana, Distt.- Nagaur, (Raj.) Email-
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in Schedule):
1 (a) /Category-B2
2. Location of
Project Near Village: Mankhand Tehsil: Kekri, District- Ajmer (Raj.)
3. Project Details
REF. No./Production
capacity
Plot. No. 64, Area-1.0159 ha., Khasra No. 1767, 1768, 1769, 1770, 1772, 1774,
Proposed Production capacity: 81,400 TPA (ROM)
(Production of Granite: 48,840 TPA, Mineral Waste: 32,560 TPA
4. Project Cost Rs. 0.80 Crore
Final minutes of 4.95th meeting held on 27-29 July, 2021
5. Water Requirement
& Source
Total Water Requirement-3.92KLD Source: Water will be made available from nearby village Mankhandvia water tanker supply.
6. Fuel &Energy: - Diesel operated machinery will be used and will be taken care by the contractor itself. If
required Electricity connection will be taken from concerned electricity department.
7. Application No.
& Date &
documents submitted: -
Online Proposal No. SIA/RJ/MIN/214058/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents for grant of EC have been submitted.
8. Information
about Aravalli
Certificate.
Aravalli Certificate was issued by AME, Sawar vide letter no. AME/Sawar/Map/(L.O.I.)-30/21
(Plot No. 64)/ dated 12/04/2021.
9. Date of
Air/Water/Noise Monitoring
Date of Air Monitoring: - 01/06/2021
Date of Water Sampling: - 01/06/2021 Date of Noise Monitoring: 01/06/2021
10. Information
about 500 mts
composite map
Cluster certificate was issued by AME, Sawar vide letter no. AME/Sawar/Map/(L.O.I.)-30/21
(Plot No. 64)/
11. Environment
Management
Plan
Annual Expenditure of Rs. 4.0Lac Per year
S.
No. Particulars
Recurring cost
(in Rs. Lac)
1. Air, Water & Noise pollution monitoring 1.00
2. Water Requirement (For dust suppression and green
belt/plantation purpose)
1.20
3. Green belt (including plant cost, tree guard and its
maintenance)
0.30
4. Contribution towards construction and maintenance of
the kachha roads after consultation with the concerned
gram Panchayat and local people
1.50
Total 4.00
12 GreenBelt/
Plantation
Annual expenditure of Rs.0.30Lac Per Year (Recurring Cost)
Note:Total 576 saplings will be planted over an area of 0.5766 hectare (more than 33% of the
mine lease area) out of which 251 saplings will be planted over the undisturbed area of 0.2509 ha and 84 saplings will be planted at an area of 0.0843 hectare. Outside the mine site in khasra
no. 2175 of gram panchayat Mankhand. At the end of life of mine 241 saplings will be planted
over the backfilled area of 0.2414 ha and It will be ensured that after ceasing mining operations
re-grassing of the mining area and any other area which may have been disturbed due to the mining activities is done and will restore the land to a condition which is fit for growth of
Year Un-worked Area Outside the mine
lease area Backfilled Area Total
Area
(Ha)
No. of
Trees Area (Ha)
No. of
Trees
Area
(Ha)
No. of
Trees Area (Ha)
No. of
Trees
Existing -- -- -- -- -- -- -- --
I 0.0836 83 0.0281 28 -- -- 0.1117 111
II 0.0836 84 0.0281 28 -- -- 0.1117 112
III 0.0837 84 0.0281 28 -- -- 0.1118 112
IV
MAINTENANCE
TO BE DONE
MAINTENANCE
TO BE DONE
-- -- MAINTENANCE
TO BE DONE V -- --
End of
life of
mine
0.2414 241 0.2414 241
0.2509 251 0.0843 84 0.2414 241 0.5766 576
Final minutes of 4.95th meeting held on 27-29 July, 2021
fodder, flora, fauna etc. as per the MoEF & CC O.M vide No. 22-34/2018-IA.III dated 16th Jan 2020. Native species which are more suitable to the local environment are preferred to be
planted such as Neem, Babool, Vilayti Babool, Khejari etc
13 Budgetary
Breakup for
Labours
Annual Expenditure of Rs.1.925Lac Per year
Sr.
No. Facility Provided for Laborers
Capital
Cost in Rs.
Recurring Cost
in Rs.
1. Shelters, Safe drinking water,
Sanitation facility
1,00,000
Maintenance
Cost: 30,000
3. Periodical medical Examination per
year @1000 Rs. per labor
20,000
4. Fuel for cooking (LPG Cylinder) @950
Rs.For 10 months 9,500
5. Books/Uniforms/scholarship for children
of labors @ 2,400 Rs. per labor 48,000
6. Group Insurance @1500 Rs. per worker 30,000 -
7.
Provision for personal protection equipment
(PPEs) like ear plug, dust mask, Helmet,
shoes etc., for20 workers
Safety shoes@350 Rs (2 times/year)
Hand Gloves @300 Rs (2 times/year)
Face mask@25 Rs (2 times in 10 month)
Ear plugs@25 Rs (2 times in 10 month)
Helmets @450 Rs(1 time/years)
14,000
12,000
10,000
10,000
9,000
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,60,000 1,92,500
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application EC for Granite Mining Project, M.L. No. 30/2021,
Plot No. 64, Area 1.0159 Ha., Khasra No. 1767, 1768, 1769, 1770, 1772, 1774, Production
Capacity 81,400 TPA (ROM) {Granite: 48,840 TPA, Waste: 32,560 TPA}, Add.- Mankhand,
Tehsil- Kekri, District- Ajmer, (Raj.) (Proposal No.- 214058). The project is covered under
B2 category. The SME, Ajmer vide order dated 19.03.2021 has issued LoI to the PP for
mining of Granite. The mining plan has been approved by the SME, Ajmer vide letter dated
09.04.2021. AME, Sawar in his certificate dated 21.05.2021 has stated that the mining lease
does not fall in Aravalli hills. DCF, Tonk and DCF, Ajmer in their certificates dated
23.02.2021 and 13.07.2021, respectively have stated that there is no Wildlife
Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine. Besides,
Final minutes of 4.95th meeting held on 27-29 July, 2021
the PP in Form-1 has also stated that there is no WLS, RF, and Conservation Reserve within
10 Km of the project site.
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by AME, Sawar on 21.05.2021, the total area of all the
mining leases in the cluster having area of 2.2962 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Ugmaram Khichad S/o Shri- Chelaram Khichad, for Granite Mining Project, M.L. No.
30/2021, Plot No. 64, Area 1.0159 Ha., Production Capacity 81,400 TPA (ROM) {Granite :
48,840 TPA, Waste: 32,560 TPA}, Khasra No. 1767, 1768, 1769, 1770, 1772, 1774, Add.-
Mankhand, Tehsil- Kekri, District- Ajmer, (Raj.) (Proposal No.- 214058), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent Shri- Ugmaram Khichad S/o Shri- Chelaram Khichad,
Add.- Mukam, Post- Seeniya, Ranigaon, Tehsil- Makrana, Distt.- Nagaur, (Raj.)
Email- [email protected], Consultant Name:- Fulgro Environmental & Engineering
Services India Pvt. Ltd., Add-27, Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.),
Email:- [email protected].
Agenda no. 14. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19608)/ 2019-20
Project Name- EC for Quartz Feldspar Mining Project, M.L. No. 58/2020, Area 1.0882
Ha., Production Capacity 25934 TPA (ROM){ Quartz : 2996 TPA, Feldspar: 11,984 TPA,
Subgrade: 2140 TPA Waste: 4280 TPA and overburden: 4534 TPA} Khasra No. 62/613, 63,
64, 65/1, 65/2, Add.- Rampuriya, Tehsil- Sahara, District- Bhilwara, (Raj.) (Proposal No.-
209709).
Project Proponent Name- Shri- Shankar Lal Jat S/o Shri- Bhura Lal Jat, Add.- Rampuriya,
Post- Lakhola, Tehsil- Sahara, Distt.- Bhilwara, (Raj.), Email- [email protected].
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in
Schedule):
1 (a) /Category-B2
2. Location of Project
Khasra No. 62/613, 63, 64, 65/1, 65/2
Near Village- Rampuriya, Tehsil: Saraha, District: Bhilwara (Raj.)
Final minutes of 4.95th meeting held on 27-29 July, 2021
3. Project Details REF.
No./Production
capacity
ML No. 58/2020, Area- 1.0882 ha
Proposed Production capacity: 25,934 TPA (ROM)
(Production of Quartz: 2,996 TPA, Feldspar: 11,984 TPA,
Subgrade: 2,140 TPA, Waste: 4,280 TPA & Over Burden: 4,534 TPA) 4. Project Cost Rs. 0.30 Crore
5. Water
Requirement
& Source
Total Water Requirement-2.50KLD
Source: Water will be made available from nearby village Rampuriya via water tanker
supply.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of
mines machineries and transportation vehicles which will be taken care by the
contractor itself. Electricity connection will be taken from concerned electricity
department.
7. Application No.
& Date & documents
submitted: -
Online Proposal No. SIA/RJ/MIN/209709/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents for grant of EC have been submitted.
8. Information
about Aravalli
Certificate.
Aravalli Certificate was issued by ME, Bhilwara vide letter no.
ME/Bhil/MAP/Aravalli/M.L. 58/2020/209 dated 19/03/2021
9. Date of
Air/Water/Noise Monitoring
Date of Air Monitoring: - 16/04/2021
Date of Water Sampling: - 16/04/2021 Date of Noise Monitoring: 16/04/2021
10. Information
about 500 mts composite map
Cluster certificate was issued by ME, Bhilwara vide letter no. ME/Bhil/MAP/Cluster/M.L.
58/2020/211 dated 19/03/2021. No other mine lease is existing within 500 m radius of the
said mine lease area.
11. Environment Management
Plan
Annual Expenditure of Rs 2.20Lac Per year
S. No. Description Recurring Cost (Rs. in
lacs)
1 Air, Water & Noise pollution monitoring 1.00
2 Water Requirement (For dust suppression and green
belt/plantation purpose) v 0.75
3 Green belt (including plant cost, tree guard and its
maintenance) 0.30
4 Contribution towards construction and maintenance of the kachha roads after consultation with the concerned
gram Panchayat and local people
0.15
Total 2.20
12 GreenBelt/ Plantation
Annual expenditure of Rs. 0.30Lac Per Year (Recurring Cost)
Year Un-worked
Area
Outside the
lease area at
own Khasra
land
Backfilled
Area Total
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No.
of
Trees
Area
(Ha)
No. of
Trees
Existing -- -- -- -- -- -- -- --
I 0.092 92 0.0275 27 -- -- 0.1195 119
II 0.092 92 0.0275 28 -- -- 0.1195 120
III 0.092 92 0.0275 28 -- -- 0.1195 120
IV MAINTENANCE TO BE DONE
-- -- MAINTENANCE
TO BE DONE V -- --
Final minutes of 4.95th meeting held on 27-29 July, 2021
Note:Total 726 saplings will be planted over an area of 0.7260 hectare, out of which 276
saplings will be planted in first three years at an undisturbed area of 0.2764 hectare and to complete 33% of the total plantation 83 saplings will be planted in first three years outside
the Mining lease area of 0.0827 Hectare at own Khasra land no. 63. At the end of life of
mine 367 saplings will be planted over backfilled area of 0.3675 hectare and it will be
ensured that after ceasing mining operations re-grassing of the mining area and any other area which may have been disturbed due to the mining activities is done and will restore the
land to a condition which is fit for growth of fodder, flora, fauna etc. as per the MoEF& CC
O.M vide No. 22-34/2018-IA.III dated 16th Jan 2020. Native species which are more suitable to the local environment are preferred to be planted such as Khejdi, Neem, Babul,
etc.
End of
life of
mine
0.3675 367 0.3675 367
Total 0.2764 276 0.0827 83 0.3675 367 0.726 726
13 Budgetary
Breakup for Labours
Annual Expenditure of Rs. 1.74050Lac Per year
Sr.
No. Facility Provided for Laborers
Capital
Cost in Rs.
Recurring Cost
in Rs.
1. Shelters, Safe drinking water, Sanitation
facility
1,00,000
Maintenance
Cost: 30,000
3. Periodical medical Examination per year
@1000 Rs. per labor
17,000
4. Fuel for cooking (LPG Cylinder) @ 950
Rs. for 10 months 9,500
5. Books/Uniforms for children of labors
@ 2,400 Rs. per labor 40,800
6. Group Insurance @1500 Rs. per worker 25,500 -
7.
Provision for personal protection
equipment (PPEs) like ear plug, dust
mask, Helmet, shoes etc., for 17 workers
Safety shoes@350 Rs (2
times/year)
Hand Gloves @300 Rs (2
times/year)
Dust mask@25 Rs (2 times in 10
month)
Ear plugs@25 Rs (2 times in 10
month)
Helmets @450 Rs (1 time/years)
11,900
10,200
8,500
8,500 7,650
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,55,500 1,74,050
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application EC for Quartz Feldspar Mining Project, M.L. No.
58/2020, Area 1.0882 Ha., Production Capacity 25934 TPA (ROM){ Quartz : 2996 TPA,
Feldspar: 11,984 TPA, Subgrade: 2140 TPA Waste: 4280 TPA and overburden: 4534 TPA}
Khasra No. 62/613, 63, 64, 65/1, 65/2, Add.- Rampuriya, Tehsil- Sahara, District- Bhilwara,
(Raj.) (Proposal No.- 209709). The project is covered under B2 category. The ADM,
Udaipur vide order dated 23.02.2021 has issued LoI to the PP for mining of Quartz &
Feldspar. The mining plan has been approved by the SME, Bhilwara vide letter dated
09.04.2021. AME, Bhilwara in his certificate dated 19.03.2021 has stated that the mining
lease does not fall in Aravalli hills. DCF, Bhilwara and DCF, WL, Chittorgarh in their
certificates dated 26.04.2021 and 22.07.2021, respectively have stated that there is no
Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine.
The project does not involve approval/ clearance under the Forest (Conservation) Act, 1980
and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any Wild
Life Sanctuary/ National Park within 10 Km from the project site.
The SEAC considered the certificate dated 19.03.2021 issued by AME, Bhilwara In
the certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is
no other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Shankar
Lal Jat S/o Shri- Bhura Lal Jat for Quartz Feldspar Mining Project, M.L. No. 58/2020, Area
1.0882 Ha., Production Capacity 25,934 TPA (ROM){Quartz : 2996 TPA, Feldspar: 11,984
TPA, Subgrade: 2140 TPA Waste: 4280 TPA and overburden: 4534 TPA}, Khasra No.
62/613, 63, 64, 65/1, 65/2, Add.- Rampuriya, Tehsil- Sahara, District- Bhilwara, (Raj.)
(Proposal No.- 209709), with the stipulation that the PP shall abide by the annual production
scheduled specified in mining plan and that any deviation there in will render the PP liable
for legal action in accordance with Environment and Mining Laws, with the specific and
general conditions annexed at Annexure ‘A’. Name of Proponent Shri- Shankar Lal Jat S/o
Shri- Bhura Lal Jat, Add.- Rampuriya, Post- Lakhola, Tehsil- Sahada, Distt.- Bhilwara,
(Raj.), Email- [email protected], Consultant Name:- Fulgro Environmental &
Engineering Services India Pvt. Ltd., Add-27, Ashok Vatika, Khatipura Road, Jhotwara,
Jaipur, (Raj.), Email:- [email protected].
Agenda no. 15. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19622)/ 2019-20
Project Name- EC for Granite Mining Project, M.L. No. 24/2021, Ref. No.
20211000034409, Area 2.1528 Ha., Production Capacity 1,48,383 TPA (ROM){ Granite
(Blockable) : 44,168 TPA, Granite khanda (non blockable): 89,377 TPA, Waste: 14,838
TPA}, Khasra No. 2525, 2545, 4052/2524, 4478/2526, Add.- Bachhkhera, Tehsil- Shahpura,
District- Bhilwara, (Raj.) (Proposal No.- 215008).
Final minutes of 4.95th meeting held on 27-29 July, 2021
Project Proponent Name- Smt. Sangita Devi W/o Shri- Hemraj Khatik, Add.- Ward No.
06, Khatik Mohalla Bachhkhera, Tehsil- Shahpura, Distt.- Bhilwara, (Raj.), Email-
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in
Schedule):
1 (a) /Category-B2
2. Location of Project
Near Village - Bachhkhera, Tehsil - Shahpura, District – Bhilwara, Rajasthan
Khasra No. 2525, 2545, 4052/2524, 4478/2526
3. Project Details
REF.
No./Production capacity
M.L. No. 24/2021, Ref. No.- 20211000034409, Area- 2.1528 ha
Proposed Production capacity: 1,48,383 TPA(ROM)
(Production of Granite (Blockable): 44,168 TPA,
Granite Khanda (Non Blockable): 89,377 TPA, Waste: 14,838 TPA) 4. Project Cost Rs. 1.00 Crore
5. Water
Requirement & Source
Total Water Requirement-5.41KLD
Source: Water will be made available from nearby village Bachhkhera via water tanker supply.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of
mines machineries and transportation vehicles which will be taken care by the
contractor itself. One D.G. Set of 15 KVA is also proposed. Electricity connection will
be taken from concerned electricity department.
7. Application No. & Date &
documents
submitted: -
Online Proposal No. SIA/RJ/MIN/215008/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite
documents for grant of EC have been submitted.
8. Information about
Aravalli
Certificate.
Aravalli Certificate was issued by ME, Bhilwara vide letter no.
ME/Bhil/MAP/(Cluster/M.L. 24/2021/246 dated 07/06/2021.
9. Date of Air/Water/Noise
Monitoring
Date of Air Monitoring: - 11/06/2021 Date of Water Sampling: - 11/06/2021
Date of Noise Monitoring: 11/06/2021
10. Information about 500 mts
composite map
Cluster certificate was issued by ME, Bhilwara vide letter no. ME/Bhil/MAP(Cluster/M.L.
24/2021/246 dated 07/06/2021. No other mine lease is existing within 500 m radius of the
said mine lease area.
Final minutes of 4.95th meeting held on 27-29 July, 2021
11. Environment Management
Plan
Annual Expenditure of Rs. 5.00 Lac Per year
S. No. Description Recurring Cost (Rs. in
lacs)
1 Air, Water & Noise pollution
monitoring
1.00
2 Water Requirement (For dust
suppression and green belt/plantation
purpose)
1.65
3 Green belt (including plant cost, tree
guard and its maintenance)
0.60
4 Contribution towards construction and
maintenance of the kachha roads after
consultation with the concerned gram
Panchayat and local people
1.75
Total 5.00
12 GreenBelt/
Plantation
Annual expenditure of Rs. 0.60Lac Per Year (Recurring Cost)
Total 1167 saplings will be planted over an area of 1.1673 hectare. Out of which 391
saplings will be planted within the first three years over an area of 0.3912 hectare at the undisturbed area and to complete 33% of the total plantation 319 saplings will be planted
outside the mine lease over an area of 0.3192 hectare in the remaining part of own Khasra
No. 2525. At the end of life of mine 457 saplings will be planted over the backfilled area of 0.4569 hectare and it will be ensured that after ceasing mining operations re-grassing of the
mining area and any other area which may have been disturbed due to the mining activities
is done and will restore the land to a condition which is fit for growth of fodder, flora, fauna
etc. as per the MoEF& CC O.M vide No. 22-34/2018-IA.III dated 16th Jan 2020. Native species which are more suitable to the local environment are preferred to be planted such as
Neem, Pipal, Sheesham, Mango etc.
Year Un-worked Area
Outside the mine
lease areaown
Khasra
Backfilled
Area Total
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No.
of Trees
Area
(Ha)
No. of
Trees
Existing - - - - - - - -
I 0.1304 130 0.1064 106 - - 0.2368 236
II 0.1304 130 0.1064 106 - - 0.2368 236
III 0.1304 131 0.1064 107 - - 0.2368 238
IV
MAINTENANCE
TO BE DONE
MAINTENANCE
TO BE DONE
- - MAINTENANCE
TO BE DONE V - -
At the
end of
life of
Mine
0.4569 457 0.4569 457
Total 0.3912 391 0.3192 319 0.4569 457 1.1673 1167
Final minutes of 4.95th meeting held on 27-29 July, 2021
13 Budgetary Breakup for
Labours
Annual Expenditure of Rs. 2.41700Lac Per year
Sr.
No. Facility Provided for Laborers
Capital
Cost in
Rs.
Recurring
Cost in Rs.
1. Shelters, Safe drinking water, Sanitation
facility
1,00,000
Maintenance
Cost: 30,000
3. Periodical medical examination per year
@1000 Rs. per labor
28,000
4. Fuel for cooking (LPG Cylinder) @950
Per cylinder. 9,500
5. Books and Uniforms for children of labors
@2,400 per labor 67,200
6. Group Insurance @ Rs.1500 per worker 42,000 -
7.
Provision for personal protection
equipment (PPEs) like ear plug, face
mask, Helmet, shoes etc., for 28 workers
Safety shoes@350 Rs (2
times/year)
Hand Gloves @300 Rs (2
times/year)
Face mask@25 Rs (2 times in 10
month)
Ear plugs@25 Rs (2 times in 10
month)
Helmets @450 Rs (1 times/year)
19,600
16,800
14,000
14,000
12,600
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,72,000 2,41,700
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Granite Mining Project, M.L. No.
24/2021, Ref. No. 20211000034409, Area 2.1528 Ha., Production Capacity 1,48,383 TPA
(ROM){ Granite (Blockable) : 44,168 TPA, Granite khanda (non blockable): 89,377 TPA,
Waste: 14,838 TPA }, Khasra No. 2525, 2545, 4052/2524, 4478/2526, Add.- Bachhkhera,
Tehsil- Shahpura, District- Bhilwara, (Raj.) (Proposal No.- 215008). The project is covered
under B2 category. The SME, Bhilwara vide order dated 07.04.2021 has issued LoI to the PP
for mining of Granite. The mining plan has been approved by the SME, Bhilwara vide letter
dated 02.06.2021. AME, Bhilwara in his certificate dated 07.06.2021 has stated that the
mining lease does not fall in Aravalli hills. DCF, Bhilwara and DCF, Ajmer in their
certificates dated 22.06.2021 and 26.07.2021, respectively have stated that there is no
Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine.
Final minutes of 4.95th meeting held on 27-29 July, 2021
DCF, Bhilwara in his certificate dated 22.06.2021 state that the nearest forest land Beed
Lasadiya is at about 6 km from the applied mining lease area. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 07.06.2021 issued by AME, Bhilwara In
the certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is
no other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1, Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Smt. Sangita
Devi W/o Shri- Hemraj Khatik, for Granite Mining Project, M.L. No. 24/2021, Ref. No.
20211000034409, Area 2.1528 Ha., Production Capacity 1,48,383 TPA (ROM) {Granite
(Blockable) : 44,168 TPA, Granite khanda (non blockable): 89,377 TPA, Waste: 14,838
TPA}, Khasra No. 2525, 2545, 4052/2524, 4478/2526, Add.- Bachhkhera, Tehsil- Shahpura,
District- Bhilwara, (Raj.) (Proposal No.- 215008), with the stipulation that the PP shall
abide by the annual production scheduled specified in mining plan and that any deviation
there in will render the PP liable for legal action in accordance with Environment and Mining
Laws, with the specific and general conditions annexed at Annexure ‘A’. Name of
Proponent Smt. Sangita Devi W/o Shri- Hemraj Khatik, Add.- Ward No. 06, Khatik
Mohalla Bachhkhera, Tehsil- Shahpura, Distt.- Bhilwara, (Raj.), Email-
[email protected], Consultant Name:- Fulgro Environmental & Engineering Services
India Pvt. Ltd., Add-27, Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:-
Agenda no. 16. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19633)/ 2019-20
Project Name- EC for Granite Mining Project, M.L. No. 31/2021, Plot no- 65, Area 1.0982
Ha., Production Capacity 1,15,830 TPA (ROM){ Granite: 69,498 TPA, Waste : 46,332
TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil- Kekri, District- Ajmer,
(Raj.) (Proposal No.- 216498).
Project Proponent Name- Shri- Amit Nayyar S/o Shri- Praveen Kumar Nayyar, Add.- C-
17, Shalimar Colony, Adarsh Nagar, Ajmer, Distt.- Ajmer, (Raj.), Email-
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in Schedule):
1 (a) /Category-B2
Final minutes of 4.95th meeting held on 27-29 July, 2021
2. Location of Project
Near Village- Mankhand, Tehsil: Kekri, District: Ajmer, Rajasthan
Khasra No. 1772,1773,1774, 1775
3. Project Details
REF.
No./Production capacity
M.L. No. 31/2021, Delineated Plot No. 65, Area-1.0982 ha
Proposed Production capacity: 1,15,830 TPA (ROM)
(Production of Granite: 69,498 TPA, Waste: 46,332 TPA)
4. Project Cost Rs. 1.00 Crore
5. Water
Requirement & Source
Total Water Requirement-4.20KLD
Source: Water will be made available by nearby villageMankhandthrough water tanker.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of mines
machineries and transportation vehicles which will be taken care by the contractor itself.
Electricity connection will be taken from concerned electricity department.
7. Application No. & Date &
documents
submitted: -
Online Proposal No. SIA/RJ/MIN/216498/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents
for grant of EC have been submitted.
8. Information about
Aravalli
Certificate.
Aravalli Certificate was issued by AME, Sawar vide letter no. AME/Sawar/MAP/(L.O.I.)-
31/2021 (Plot No. 65)/106 dated 21/05/2021
9. Date of
Air/Water/Noise
Monitoring
Date of Air Monitoring: - 13/06/2021
Date of Water Sampling: - 13/06/2021
Date of Noise Monitoring: 13/06/2021
10. Information about 500 mts
composite map
Cluster certificate was issued by AME, Sawar vide letter no. AME/Sawar/MAP/ (L.O.I.)-
31/2021(Plot No. 65)/107 dated 21/05/2021. One other mine lease is existing within 500 m
radius of the said mine lease area.
11. Environment
Management
Plan
Annual Expenditure of Rs. 5.00 Lac Per year
S. No. Description Recurring Cost (Rs. in
lacs)
1 Air, Water & Noise pollution monitoring 1.00
2 Water Requirement (For dust suppression and
green belt/plantation purpose) 1.50
3 Green belt/Plantation (including plant cost, tree
guard and its maintenance) 0.50
4
Contribution towards construction and
maintenance of the kachha roads after
consultation with the concerned gram Panchayat
and local people
2.00
Total 5.00
12 GreenBelt/
Plantation
Annual expenditure of Rs. 0.50Lac Per Year (Recurring Cost)
Year Un-worked Area Outside the mine
lease area
(Backfilled
Area)
Top Soil
Dumps Total
Area (Ha)
No. of Trees
Area (Ha)
No. of Trees
Area (Ha)
No. of
Trees
Area (Ha)
No. of
Trees
Area (Ha)
No. of Trees
Existing - - - - - - - - - -
I 0.0860 86 0.0347 34 - - - - 0.1207 120
II 0.0860 86 0.0347 35 - - - - 0.1207 121
III 0.0860 86 0.0348 35 - - - - 0.1208 121
IV MAINTENANCE
TO BE DONE MAINTENANCE
TO BE DONE
- - - - MAINTENANCE
TO BE DONE V - - - -
At the 0.5000 500 - - 0.5000 500
Final minutes of 4.95th meeting held on 27-29 July, 2021
Note:Total 862 saplings will be planted over an area of 0.8622 hectare (33% of the mine
lease area) Out of which 258 saplings will be planted over the undisturbed area of 0.2582 hectare within the first three years and to complete 33%of the total plantation 104 saplings
will be planted outside the mine lease over an area of 0.1042 ha in Khasra no. 1652,1404
&544 of Gram panchayat Mankhand. At the end of life of mine 500 saplings will be planted over the backfilled area of 0.5000 ha and it will be ensured that after ceasing mining
operations re-grassing of the mining area and any other area which may have been disturbed
due to the mining activities is done and will restore the land to a condition which is fit for growth of fodder, flora, fauna etc. as per the MoEF& CC O.M vide No. 22-34/2018-IA.III
dated 16th Jan 2020. Native species which are more suitable to the local environment are
preferred to be planted such as Neem, Pipal, Sheesham, Mango etc.
end of life of Mine
Total 0.2582 258 0.1042 104 0.5000 500 - - 0.8622 862
13 Budgetary Breakup for
Labours
Annual Expenditure of Rs. 1.92500Lac Per year
Sr.
No. Facility Provided for Laborers
Capital
Cost in Rs.
Recurring Cost
in Rs.
1. Shelters, Safe drinking water, Sanitation
facility
1,00,000 Maintenance Cost:
30,000
3. Periodical medical Examination per year
@1000 Rs. per labor
20,000
4. Fuel for cooking (LPG Cylinder) @ 950
Rs. for 10 months 9,500
5. Education for children of labors @ 2,400
Rs. per labor 48,000
6. Group Insurance @1500 Rs. per worker 30,000 -
7.
Provision for personal protection
equipment (PPEs) like ear plug, dust mask,
Helmet, shoes etc., for 20 workers
Safety shoes@350 Rs (2
times/year)
Hand Gloves @300 Rs (2
times/year)
Dust mask@25 Rs (2 times in
month)
Ear plugs@25 Rs (2 times in
month)
Helmets @450 Rs (1 time/years)
14,000
12,000
10,000
10,000
9,000
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,60,000 1,92,500
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted EC for Granite Mining Project, M.L. No. 31/2021, Plot no- 65,
Area 1.0982 Ha., Production Capacity 1,15,830 TPA (ROM){ Granite: 69,498 TPA, waste
:46,332 TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal No.- 216498). The project is covered under B2 category.
The SME, Ajmer vide order dated 18.03.2021 has issued LoI to the PP for mining of Granite.
The mining plan has been approved by the SME, Ajmer vide letter dated 10.06.2021. AME,
Sawar in his certificate dated 21.05.2021 has stated that the mining lease does not fall in
Aravalli hills. DCF, Ajmer and DCF, Tonk in their certificates dated 16.07.2021 and
23.02.2021, respectively have stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. Besides, the PP in Form-1 has
also stated that there is no WLS, National Park and Conservation Reserve within 10 Km of
the project site.
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by AME, Sawar on 21.05.2021, the total area of all the
mining leases in the cluster having area of 2.3785 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Amit
Nayyar S/o Shri- Praveen Kumar Nayyar, for Granite Mining Project, M.L. No. 31/2021,
Plot no- 65, Area 1.0982 Ha., Production Capacity 1,15,830 TPA (ROM) {Granite: 69,498
TPA, Waste :46,332 TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil-
Kekri, District- Ajmer, (Raj.) (Proposal No.- 216498), with the stipulation that the PP shall
abide by the annual production scheduled specified in mining plan and that any deviation
there in will render the PP liable for legal action in accordance with Environment and Mining
Laws, with the specific and general conditions annexed at Annexure ‘A’. Name of
Proponent Shri- Amit Nayyar S/o Shri- Praveen Kumar Nayyar, Add.- C-17, Shalimar
Colony, Adarsh Nagar, Ajmer, Distt.- Ajmer, (Raj.), Email- [email protected],
Consultant Name:- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:- [email protected].
Agenda no. 17. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19634)/ 2019-20
Project Name- EC for Granite Mining Project, M.L. No. 32/2021, Plot no- 67, Area 1.0257
Ha., Production Capacity 1,15,830 TPA (ROM){ Granite: 69498 TPA, Waste : 46,332
TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil- Kekri, District- Ajmer,
(Raj.) (Proposal No.- 216472).
Project Proponent Name- Shri- Amit Nayyar S/o Shri- Praveen Kumar Nayyar, Add.- C-
17, Shalimar Colony, Adarsh Nagar, Ajmer, Distt.- Ajmer, (Raj.), Email-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in
Schedule):
1 (a) /Category-B2
2. Location of Project
Near Village- Mankhand, Tehsil: Kekri, District: Ajmer, Rajasthan
Khasra No. 1772,1773,1774, 1775
3. Project Details
REF.
No./Production capacity
M.L. No. 32/2021, Delineated Plot No. 67, Area- 1.0257 ha
Proposed Production capacity: 1,15,830 TPA (ROM)
(Production of Granite: 69,498 TPA, Waste: 46,332 TPA) 4. Project Cost Rs. 1.00 Crore
5. Water
Requirement & Source
Total Water Requirement-4.00KLD
Source: Water will be made available by nearby villageMankhandthrough water tanker.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of mines
machineries and transportation vehicles which will be taken care by the contractor itself.
Electricity connection will be taken from concerned electricity department.
7. Application No. & Date &
documents
submitted: -
Online Proposal No. SIA/RJ/MIN/216472/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents
for grant of EC have been submitted.
8. Information
about
Aravalli
Certificate.
Aravalli Certificate was issued by AME, Sawar vide letter no. AME/Sawar/MAP/(L.O.I.)-
32/2021/108 dated 21/05/2021.
9. Date of
Air/Water/Noise
Monitoring
Date of Air Monitoring: - 13/06/2021
Date of Water Sampling: - 13/06/2021
Date of Noise Monitoring: 13/06/2021
10. Information about 500 mts
composite map
Cluster certificate was issued by AME, Sawar vide letter no. AME/Sawar/MAP/ (L.O.I.)-
32/2021(Plot No. 67)/109 dated 21/05/2021. One other mine lease is existing within 500 m
radius of the said mine lease area
11. Environment
Management
Plan
Annual Expenditure of Rs. 5.00 Lac Per year
S. No. Description Recurring Cost (Rs. in
lacs)
1 Air, Water & Noise pollution monitoring 1.00
2 Water Requirement (For dust suppression and
green belt/plantation purpose) 1.50
3 Green belt/Plantation (including plant cost, tree
guard and its maintenance) 0.40
4
Contribution towards construction and
maintenance of the kachha roads after
consultation with the concerned gram Panchayat
and local people
2.10
Total 5.00
Final minutes of 4.95th meeting held on 27-29 July, 2021
12 GreenBelt/ Plantation
Annual expenditure of Rs. 0.40Lac Per Year (Recurring Cost)
Note:Total 839 saplings will be planted over an area of 0.8384 hectare (more than 33% of the mine lease area) Out of which 186 saplings will be planted over the undisturbed area of
0.1857 hectare within the first three years and to complete 33 % of the total plantation 153
saplings will be planted outside the mine lease over an area of 0.1527 ha in khasra no. 1652,1404 & 544 of Gram Panchayat Mankhand. At the end of the life of mine 500 saplings
will be planted at the backfilled area of 0.5000 ha and it will be ensured that after ceasing
mining operations re-grassing of the mining area and any other area which may have been
disturbed due to the mining activities is done and will restore the land to a condition which is fit for growth of fodder, flora, fauna etc. as per the MoEF& CC O.M vide No. 22-34/2018-
IA.III dated 16th Jan 2020. Native species which are more suitable to the local environment
are preferred to be planted such as Neem, Pipal, Sheesham, Mango etc.
Year Un-worked Area Outside the mine
lease area
(Backfilled
Area)
Top Soil
Dumps Total
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Existing - - - - - - - - - -
I 0.0619 62 0.0509 51 - - - - 0.1128 113
II 0.0619 62 0.0509 51 - - - - 0.1128 113
III 0.0619 62 0.0509 51 - - - - 0.1128 113
IV
MAINTENANCE
TO BE DONE MAINTENANCE
TO BE DONE
- - - - MAINTENANCE
TO BE DONE V - - - -
At the end of life of Mine
0.5000 500
- -
0.5000 500
Total 0.1857 186 0.1527 153 0.5000 500 - - 0.8384 839
13 Budgetary
Breakup for
Labours
Annual Expenditure of Rs. 1.92500Lac Per year
Sr.
No. Facility Provided for Laborers
Capital
Cost in Rs.
Recurring Cost
in Rs.
1. Shelters, Safe drinking water, Sanitation
facility
1,00,000 Maintenance Cost:
30,000
3. Periodical medical Examination per year
@1000 Rs. per labor
20,000
4. Fuel for cooking (LPG Cylinder) @ 950
Rs. for 10 months 9,500
5. Education for children of labors @ 2,400
Rs. per labor 48,000
6. Group Insurance @1500 Rs. per worker 30,000 -
7.
Provision for personal protection
equipment (PPEs) like ear plug, dust mask,
Helmet, shoes etc., for 20 workers
Safety shoes@350 Rs (2
times/year)
Hand Gloves @300 Rs (2
times/year)
Dust mask@25 Rs (2 times in
month)
Ear plugs@25 Rs (2 times in
month)
14,000
12,000
10,000
10,000
9,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
Helmets @450 Rs (1 time/years)
8. First Aid Box 10,000
9. Fire Safety 30,000 20,000
Total 1,60,000 1,92,500
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted EC for Granite Mining Project, M.L. No. 32/2021, Plot no-
67, Area 1.0257 Ha., Production Capacity 1,15,830 TPA (ROM){ Granite: 69498 TPA,
Waste : 46,332 TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal No.- 216472). The project is covered under B2 category.
The SME, Ajmer vide order dated 18.03.2021 has issued LoI to the PP for mining of Granite.
The mining plan has been approved by the SME, Ajmer vide letter dated 10.06.2021. AME,
Sawar in his certificate dated 21.05.2021 has stated that the mining lease does not fall in
Aravalli hills. DCF, Ajmer and DCF, Tonk in their certificates dated 16.07.2021 and
23.02.2021, respectively have stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. Besides, the PP in Form-1 has
also stated that there is no WLS, National Park and Conservation Reserve within 10 Km of
the project site.
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by AME, Sawar on 21.05.2021, the total area of all the
mining leases in the cluster having area of 2.3060 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri Amit
Final minutes of 4.95th meeting held on 27-29 July, 2021
Nayyar S/o Shri- Praveen Kumar Nayyar for Granite Mining Project, M.L. No. 32/2021,
Plot no- 67, Area 1.0257 Ha., Production Capacity 1,15,830 TPA (ROM){ Granite: 69,498
TPA, Waste : 46,332 TPA}, Khasra No. 1772, 1773, 1774, 1775, Add.- Mankhand, Tehsil-
Kekri, District- Ajmer, (Raj.) (Proposal No.- 216472), with the stipulation that the PP shall
abide by the annual production scheduled specified in mining plan and that any deviation
there in will render the PP liable for legal action in accordance with Environment and Mining
Laws, with the specific and general conditions annexed at Annexure ‘A’. Name of
Proponent Shri- Amit Nayyar S/o Shri- Praveen Kumar Nayyar, Add.- C-17, Shalimar
Colony, Adarsh Nagar, Ajmer, Distt.- Ajmer, (Raj.), Email- [email protected],
Consultant Name:- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur, (Raj.), Email:- [email protected].
Agenda no. 18. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19110)/ 2019-20
Project Name- Environmental Clearance for Red Ochre Mining Project, ML. No.- 2/2020,
Ref. No.- 20201000021155, QL. Area- 2.0069 ha., Production Capacity- 72,900 TPA {Red
Ochre- 72,900 TPA, Waste- nil}, Khasra No.- 818, 819, 822, 825, Near Vill.- Akhepur,
Tehsil & Distt.- Pratapgarh (Raj.) (Proposal No.-193480).
Project Proponent Name- Smt. Resham Bai W/o Late Sh. Sukhnath, Add.- House No.-8,
Ward No.01,Jadwasa,Distt.-Ratlam(MP) [email protected].
Consultant Name- Fulgro Environmental & Engineering Services India Pvt. Ltd., Add-27,
Ashok Vatika, Khatipura Road, Jhotwara, Jaipur,(Raj.)Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no. (in
Schedule):
1 (a) /Category-B2
2. Location of
Project Located at Khasra No. 818, 819, 822, 825
Near Village-Akhepur, Tehsil- Pratapgarh & District-Pratapgarh (Raj.)
3. Project Details REF.
No./Production
capacity
M.L. No.- 2/2020, Ref. No. 20201000021155, Area-2.0069 ha
Production capacity: 72,900 TPA
(Production of Red Ochre: 72,900 TPA, Waste: Nil) 4. Project Cost Rs. 0.40 Crore
5. Water
Requirement & Source
Total Water Requirement-3.02KLD
Source: Water will be made available from nearby village Akhepurvia water tanker supply.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of mines
machineries and transportation vehicles which will be taken care by the contractor itself.
Electricity connection will be taken from concerned electricity department.
7. Application No. & Date &
documents
submitted: -
Online Proposal No. SIA/RJ/MIN/193480/2021
Documents:FORM-I & PFR along with approved mining plan & all the requisite documents
for grant of EC have been submitted.
8. Information
about
Aravalli
Certificate.
Aravalli Certificate was issued by ME, Pratapgarh vide letter no. ME/Pratap/CC-Minor/M.L.
02/2020/2020-21/7766 dated 24/12/2020
Final minutes of 4.95th meeting held on 27-29 July, 2021
9. Date of Air/Water/Noise
Monitoring
Date of Air Monitoring: - 04/01/2021 Date of Water Sampling: - 04/01/2021
Date of Noise Monitoring: 04/01/2021
10. Information
about 500 mts composite map
Cluster certificate was issued by ME, Pratapgarh vide letter no. ME/Pratap/CC-Minor/M.L.
02/2020/2020-21/945 dated 22/07/2021. No other mine lease is existing within 500 m radius
of the said mine lease area.
11. Environment
Management
Plan
Annual Expenditure of Rs 2.50Lac Per year
S.
No. Particulars
Recurring cost
(in Rs. Lac)
5. Air, Water & Noise pollution monitoring 1.00
6. Water Requirement (For dust suppression and
green belt/plantation purpose) 0.90
7. Green belt (including plant cost, tree guard and its
maintenance) 0.50
8. Contribution towards construction and maintenance of the kachha roads after consultation with the concerned
gram Panchayat and local people
0.10
Total 2.50
12 GreenBelt/
Plantation
Annual expenditure of Rs. 0.50Lac Per Year (Recurring Cost)
Note:Total 1945 saplings will be planted over an area of 1.9444 ha. (more than 33% of the
mine lease area). Out of which 662 saplings will be planted within first three years of mining
at undisturbed area of 0.6620 Ha. within mining lease area. At the end of life of mine 1283 saplings will be planted at the backfilled area of 1.2824 ha.and it will be ensured that after
ceasing mining operations re-grassing of the mining area and any other area which may have
been disturbed due to the mining activities is done and will restore the land to a condition
which is fit for growth of fodder, flora, fauna etc. as per the MoEF& CC O.M vide No. 22-34/2018-IA.III dated 16th Jan 2020. Native species which are more suitable to the local
environment are preferred to be planted such as Shisam, Neem, Pipal, Babul, etc.
Year Undisturbed
Area
Outside the
mine lease
area in own
Khasra
Top Soil
Dumps
Backfilled
Area Total
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees
Area
(Ha)
No. of
Trees Area (Ha)
No. of
Trees
Existing -- -- -- -- -- -- -- --
-- --
I 0.2207 221 -- -- -- -- -- -- 0.2207 221
II 0.2207 221 -- -- -- -- -- -- 0.2207 221
III 0.2206 220 -- -- -- -- -- -- 0.2206 220
IV
MAINTENANCE TO BE
DONE
-- -- -- -- MAINTENANCE
TO BE DONE V -- -- -- --
End of
life of
mine
-- -- 1.2824 1283 1.2824 1283
Total 0.6620 662 -- -- -- -- 1.2824 1283 1.9444 1945
Final minutes of 4.95th meeting held on 27-29 July, 2021
13 Budgetary Breakup for
Labours
Annual Expenditure of Rs. 1.310 Lac Per year
Sr.
No. Facility Provided for Laborers
Capital Cost
in Rs.
Recurring Cost
in Rs.
1. Shelters, Safe drinking water,
Sanitation facility
1,00,000
Maintenance
Cost: 30,000
2. Periodical medical Examination per
year @1000 Rs. per labor
10,000
3. Fuel for cooking (LPG Cylinder) @950 Rs.
Per month 9,500
4. Books/Uniform for children of labors @
2,400 Rs. per labor 24,000
5. Group Insurance @1500 Rs. per worker 15,000 -
6.
Provision for personal protection
equipment (PPEs) like ear plug, face mask,
Helmet, shoes etc., for 10 workers
Safety shoes@350 Rs (2
times/year)
Hand Gloves @300 Rs (2
times/year)
Face mask@25 Rs (2 times in
month)
Ear plugs@25 Rs (2 times in
month)
Helmets @450 Rs(1 time/years)
7,000
6,000
5,000
5,000
4,500
7. First Aid Box 10,000
8. Fire Safety 30,000 20,000
Total 1,45,000 1,31,000
14 Present Status Fresh LOI now proposed for the grant of Environmental Clearance.
Observations of the committee:-
The SEAC considered/examined the project proposal on 27.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application Environmental Clearance for Red Ochre Mining
Project, ML. No.- 2/2020, Ref. No.- 20201000021155, QL. Area- 2.0069 ha., Production
Capacity- 72,900 TPA {Red Ochre- 72,900 TPA, Waste- nil}, Khasra No.- 818, 819, 822,
825, Near Vill.- Akhepur, Tehsil & Distt.- Pratapgarh (Raj.) (Proposal No.-193480). The
project is covered under B2 category. The ADM, Udaipur vide order dated 21.09.2020 has
issued LoI to the PP for mining of Red Ochre. The mining plan has been approved by the
SME, Udaipur vide letter dated 04.12.2020. AME, Pratapgarh in his certificate dated
24.12.2020 has stated that the mining lease does not fall in Aravalli hills. DCF, Chittorgarh
and DFO, Mandsaur in their certificates dated 04.01.2020 and 20.07.2021, respectively have
stated that there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km
periphery of the mine. The DCF, Chittorgarh has also stated that the nearest Sitamata WLS is
at a distance of 25.0 Km from the applied lease area.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by ME, Pratapgarh on 22.07.2021, the total area of all
the mining leases in the cluster having area of 2.0069 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Smt. Resham
Bai W/o Late Sh. Sukhnath, for Red Ochre Mining Project, ML. No.- 2/2020, Ref. No.-
20201000021155, QL. Area- 2.0069 ha., Production Capacity- 72,900 TPA {Red Ochre-
72,900 TPA, Waste- nil}, Khasra No.- 818, 819, 822, 825, Near Vill.- Akhepur, Tehsil &
Distt.- Pratapgarh (Raj.) (Proposal No.-193480), with the stipulation that the PP shall abide
by the annual production scheduled specified in mining plan and that any deviation there in
will render the PP liable for legal action in accordance with Environment and Mining Laws,
with the specific and general conditions annexed at Annexure ‘A’. Name of Proponent: Smt.
Resham Bhai W/o Late Sh. Sukhnath, Add.- House No.-8, Ward No.- 01, Jadwasa, Distt.-
Ratlam (MP), [email protected], Consultant Name:- Fulgro Environmental
& Engineering Services India Pvt. Ltd., Add-27, Ashok Vatika, Khatipura Road, Jhotwara,
Jaipur, (Raj.), Email:- [email protected].
Agenda no. 19. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(16617)/ 2019-20
Project Name- Application for approval of EIA/ EMP with respect to Bhawanipura & Sutra
Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Nana Lal
Dhakar for Bhawanipura Sandstone & Khanda Mining Project, Ref. No. 2018100001552,
area- 1.0023 ha., Production Capacity 1,35,662 TPA at Khasra No. 138 & 140, Near
Village– Bhawanipura, Tehsil– Talera, Dist.- Bundi, (Raj.) (Proposal No. 61904).
Project Proponent Name- Shri Nana Lal Dhakar, Co-owners– 1. Shri Jagdish Chand
Dhakar, 2. Shri Rekh Lal Darad, 3. Shri Basanti Lal, Add.- E-820, Indra Vihar, Kota Distt.
Kota (Raj.), Email –[email protected].
Consultant Name- COGNIZANCE RESEARCH INDIA PRIVATE LTD. Add.- Office GT
– 20, Sec – 117, Noida (U.P.).
Observations of the committee:-
The SEAC considered for approval of EIA/ EMP with respect to Bhawanipura &
Sutra Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Nana Lal
Dhakar for Bhawanipura Sandstone & Khanda Mining Project, Ref. No. 2018100001552,
area- 1.0023 ha., Production Capacity 1,35,662 TPA at Khasra No. 138 & 140, Near
Village– Bhawanipura, Tehsil– Talera, Dist.- Bundi, (Raj.) (Proposal No. 61904), in its
Final minutes of 4.95th meeting held on 27-29 July, 2021
4.95th meeting held on 28.07.2021 through VC/ electronic media in accordance with letter
dated 27.05.2020 of SEIAA, Rajasthan.
The project was also considered earlier in terms of OM dated 12.12.2018 of the MoEF
& CC by SEAC in its 4.42th meeting held on 09th July, 2020 prescribing ToR for undertaking
EIA studies and for preparing EMP as the size of the cluster in which the proposed project
lies exceeded 5.0 ha. The SEAC vide letter dated 30.07.2020 asked the PP to conduct EIA
studies and prepare EMP for the entire cluster in order to capture all the possible externalities.
One season post monsoon primary base line data of the ambient air quality PM2.5,
PM10, SO2 and NOX, Water Quality, Noise level, Soil quality and Flora and Fauna were
collected during Oct. 2019 to Dec. 2019.
The PP following the above decision got public notice published in 04.12.2020
edition of Dainik Bhaskar, Bundi and 04.12.2020 edition of Jaabaz Patrika, Bundi and for
holding public hearing for the entire cluster for ascertaining material concerns for local
affected persons and it such concerns into account in the EIA/EMP report.
Public hearing was accordingly held on 08.01.2021 at 03.30 PM at Gram panchayat
Office, Sutda “Jan Suvida Kendra Sutda”, Tehsil Talera and District Bundi, for the entire
cluster and with reference to application for EC for mining activity by Bhawanipura & Sutra
Sandstone & Khanda Mining Project, (Cluster no.-1, Cluster area- 27.1351 ha.), Ref. No.
2018100001552, area-1.0023 ha., Production Capacity 1,35,662 TPA at Khasra No. 138 &
140, Near Village– Bhawanipura, Tehsil – Talera, Disst.- Bundi, (Raj.), under the
Chairmanship of Sh. Amanullah Khan, Add. District Collector, Bundi and Sh. Rakesh Gupta,
Regional officer, RSPCB, Kota, was also present during public hearing.
The details of issue raised by the public and commitments made by the PP during
public hearing and the action plan for implementation thereof are as follows:-
S.
No.
Name of Person with
address
Queries/Suggestions Replies Time bound plan of
action with
financial allocation
for cluster
1. Shri Papu Singh, Sutra What will be done to
prevent dust from
mining work ?
In the project, water
will be sprinkled on
the roads by tanker
and plantation will be
done nearby to
prevent dust from
blowing.
Financial Allocation
1,80,000/- Rupees
for water Sprinkling.
2. What will be done for
the animals ?
Tanks will be made
for animal water
drinking and if fodder
is needed in summer
provision has been
Allocation
1,00,000/- Rupees
per year for Tanks for
animal water
drinking .
Final minutes of 4.95th meeting held on 27-29 July, 2021
made to arrange
through CSR.
3. Shri Kanhaiya Lal
Prajapati, Sutra
If mining operation will
be start, what
arrangements made for
school children?
In the initial time, the
applicant shall be
arrange computer,
books and notebooks
for the children of
village – Sutra,
Bhawanipura, Dabi
under CSR activity
Allocation
4,50,000/- Rupees
for Schools.
4 Shri Kamal Kishor
Meena (SDM, Bundi)
SDM asked to project
proponent, you have
been told that 33% of
the plantation will be
done in the mining
area, will it be done on
the mines or can be
done in other places
also?
Plantation can be
done wherever land is
available mining area
and around the
mining area.
If land is not
available, Plantation
can also be done by
taking land from the
district
administration.
Allocation
1,80,000/- Rupees
for plantation.
5 SDM asked to project
proponent, Will you
keep the stairway
structure in the mining
pit or not ?
Staircase structures
are made in the
mining pit so that no
accidents occur.
The PP following issue of ToR, has submitted application for obtaining EC along with
the final EIA/ EMP report and the proceedings of public hearing on 13.03.2021.
The Bhawanipura & Sutra Sandstone & Khanda Cluster No. 1 as mentioned by SME,
Kota in certificate dated 27.07.2021 has Cluster area 27.1351 ha., and comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA.
The particulars of individual mining/ leases including their budget for EMP/
Labour welfare, which area part of cluster no.1 are as follows:
Sr Name
Final minutes of 4.95th meeting held on 27-29 July, 2021
.
N
o.
of
Holder
of
LOI/Q
L/ML/
Ref.
No.
LOI/Q
L/
ML
No./Re
f. No.
Date of
Sanctio
n
Name of
Mineral
Area (in
Ha)
Khasra
No.
Pro
duct
ion
Cap
acity
Project
Cost
(in Cr.)
Weather
EC
obtained if
yes, Name
of
Authority
and Date
Bud
get
for
EM
P
(Rec
urri
ng)
(in
Rs)
Budg
et for
Gree
n
Belt
Devel
opme
nt (in
Rs)
Budget
for
Labour
Welfare
(in Rs)
1. Shri
Nanda
Karad
Ref.
no.
201810
000631
1/10/20
18
Sandstone
& Khanda 2.4353 192
4,84,
415
0.80 Now
applied
5,60,
000
60,00
0 110000
2
Shri
Nana
Lal
Dhakar
Ref.
no.
201810
000155
2
8/02/20
19
Sandstone
& Khanda 1.0023 138, 140 1,35,
662
0.80 Now
applied
5,60,
000
55,00
0 100000
3
Shri
Devi
Singh
Ref.
no.
201810
000118
1
10/01/2
019
Sandstone
2.4111 1081/208,
209
2,68,
528
0.50 Now
applied
3,50,
000
40,00
0 100000
4.
M/s
Shivam
Stone
M.L.N
o.04/20
13
26/02/2
014
Sandstone
4.8988
177,178,17
9,180,181,
446/182
70,0
00
0.40
F-
1/DEIAA/
Bundi/2018
/85-115 on
dated
23/03/2018
1,70,
000
30,00
0 100000
5
M/s
Leonar
d
Mineral
s &
Exim
PVT.
LTD.
M.L.N
o.09/20
12
03/04/1
3
Sandstone
4.0018
172,173,16
9 20,1
88.2
0.75
F-
1/DEIAA/
Bundi/2018
/161-191
on dated
06/09/2018
2,00,
000
30,00
0 100000
6
Smt.
Angur
Bala
Jain
M.L.N
o.3/201
4
1/09/20
17
Sandstone
4.1005
236,237,10
90/232,108
9/232,822,
1125/823,8
07
79,1
58
0.25
F(14)/DEI
AA/SEIAA
/SEAC-
Raj/Sectt/P
roject/Cat.1
(A)B2(EC)
14-15 on
dated
30/11/2016
2,05,
000
25,00
0 50000
7
M/s
Panna
Stone
Suppli
ers
M.L.N
o.03/20
13
26/09/2
013
Sandstone
4.0266 163,164,16
5,152
60,0
00
0.25
F(14)/DEI
AA/SEIAA
/SEAC-
Raj/Sectt/P
roject/Cat.1
(A)B2(EC)
2,05,
000
25,00
0 50000
Final minutes of 4.95th meeting held on 27-29 July, 2021
14-15 on
dated
30/11/2016
8 M/s
Dev
Stone
M.L.N
o.05/20
13
28/03/2
018
Sandstone
4.2587 197,197/2,
198,194/2
5794
0.38
0.60
F-
1/DEIAA/
Bundi/2018
/85-115 on
dated
23/03/2018
1,80,
000
20,00
0 50000
The SME, Kota vide letter dated 08.07.2021 has approved mining plan for mining of
Sandstone and Khanda with respect to the said cluster. According to the information
submitted by the PP, mining leases covered under the cluster do not fall in Aravalli hills and
that there is no National Park/ Wildlife Sanctuary within the periphery of 10 Km from the
mining leases in the cluster. The PP has given an undertaking that cluster EMP shall be
implemented by the LOIs/ mining lease holders collectively in consultation and supervision
of the concerned Mining Engineer.
The particulars of EMP with respect to cluster No. 1, are as follows:
S.
No
.
Particula
rs
Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B1
2. Location
of the Project
Near village – Bhawanipura & Sutra, Tehsil: Talera, District: Bundi (Rajasthan)
3. Project Details M.L No./ Production Capacity
S.
No.
Name of
Proponents
Ref. & ML. No Area
(Hect.)
Production
Capacity in
Tonnes
(ROM)
Project
Cost
(crore)
1. Shri Nanda
Karad 201810000631 2.4353 4,84,415 0.80
2. Shri Nana Lal
Dhakar 2018100001552 1.0023 1,35,662 0.80
3. Shri Devi Singh 2018100001181 2.4111 2,68,528 0.50
4. M/s Shivam
Stone 04/2013 4.8988 70,000 0.40
5.
M/s Leonard
Minerals &
Exim PVT. LTD.
09/2012 4.0018 20,188.2 0.75
6. Smt. Angur
Bala Jain 3/2014 4.1005 79,158 0.25
7.
M/s Panna
Stone
Suppliers
3/2013 4.0266 60,000 0.25
8. M/s Dev Stone 5/2013 4.2587 57940.38 0.60
Total 27.1351 1175891.58 4.35
4. Project Cost
S. No. Name of Proponents
Ref. & ML. No Project Cost (crore)
1. Shri Nanda Karad 201810000631 0.80
2. Shri Nana Lal Dhakar 2018100001552 0.80
3. Shri Devi Singh 2018100001181 0.50
4. M/s Shivam Stone 04/2013 0.40
5. M/s Leonard Minerals 09/2012 0.75
Final minutes of 4.95th meeting held on 27-29 July, 2021
& Exim PVT. LTD.
6. Smt. Angur Bala Jain 3/2014 0.25
7. M/s Panna Stone
Suppliers 3/2013 0.25
8. M/s Dev Stone 5/2013 0.60
Total 4.35
5. Water requirement & Source
S. No
Activities
Average demand KLD
0063
1
00155
2
00118
1
04/1
3
09/1
2
3/1
4
3/1
3
5/1
3
1 Dust
Suppression
1.5 1.0 1.0 1.5 1.0 2.5 2.5 1.5
2 Green Belt 1.5 1.5 1.0 2.0
1.0 3.0 3.0 2.5
3
Drinking &
Domestic use
2.0 1.5 2.0
2.5
1.5
3.5 3.5 3.0
Total 5.0 4.0 4.0 6.0 3.5 9.0 9.0 7.0
Total water demand of cluster (8 lease) = 47.5 KLD
Source: Water will be made available by nearby village Bhawanipura & Sutra through water tanker.
6. Fuel & Energy
Diesel operated machinery will be used. Fuel will be required for the operation of mines machineries and transportation vehicles which will be taken care by the contractor itself. 15 KVA of DG set also
proposed. Electricity connection will be taken from the concerned electricity department. For mining leases already operational electricity connection has already been taken.
7. Application no., Date of Documents Submitted
Category : B1 SEAC FILE NO. : 16617,16564,15883 Date of documents Submitted : 16/03/2021 SEAC Meeting No. : 4.95th Meeting Agenda Sr. No. : 19,20,21 Date of Presentation : 28/07/2021
8. Information about Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019, ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019, ME/Bundi/Map/2019/58 dated 23/07/2019.
9. Date of Air,
Water, Noise, monitoring
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
10. Information about 500 mts composite
map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019 , ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019, ME/Bundi/Map/2019/58 dated 23/07/2019. Area falling within 500 mts 27.1351ha.
Final minutes of 4.95th meeting held on 27-29 July, 2021
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 24.3 lacs Recurring Cost: Rs. 24.3 lacs per annum.
Sl. No
Description Measures
Capital Cost (Rs. In lakhs)
Recurring Cost(in lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling
Planting plant species
which can control air pollution along the approach road.
6.40
1.00 1.30
6.40
1.00 1.30
2 Water Pollution Control
Septic tanks for
workers 1.00 1.00
3 Green Belt Development
Barrier zone
Near lease area 1.50 1.50
4 Water Tanks for cattles
Tanks will be made for
animal water drinking 1.00 1.00
5 Occupational health
Medical facilities
including periodic health checkups and first aid facility for labors.
1.90 1.90
6
Ramps Garland Drain Rainwater harvesting
For protection while
loading and transporting the mineral ramp will be constructed.
2.20 2.20
7
Govt. Sr. Sec. School at village Ganeshpura
Repair of School Building & Room Construction
Solar Power Plant 2KW
Furniture (Tables &
Chairs) & Computers
3.50 3.50
8 Sub health centre, Bhawanipura
Medicine and Medical
equipments
Sanitary Pads 2.50 2.50
9
Village Devlopment, Bhawanipura& Sutra
Cleanliness
Drinking water
Public toilets 2.00 2.00
Total 24.3 24.3
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt
& Plantation
Total green belt will be the 33% of the mine area 8.955 ha of the area shall be carried out near lease
area and trees shall be planted both side of the road connected to mine, Statutory Barrier & Part of own khatedari land at village Bhawanipura & Sutra in 192,138,140, 209, 446/182, 169, 236, 164, 197 & with join venture association Native species which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Mango (Mangifera Indica), Amla (Phyllanthus Emblica) etc. it is the proposed to invest 2 Lac. Rs. Per annum for greenbelt development.
Year Along the lease boundary &
Outside the lease area Top Soil Dumps Total
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for approval of EIA/EMP and EC with respect to
Bhawanipura Sandstone & Khanda Mining Project, Ref. No. 2018100001552, area- 1.0023
ha., Production Capacity 1,35,662 TPA at Khasra No. 138 & 140, Near Village–
Bhawanipura, Tehsil– Talera, Dist.- Bundi, (Raj.) (Proposal No. 61904). The SME, Kota
vide order dated 08.02.2019 has issued LoI to the PP having validity of a period of 18
months. The validity of LOI has been extended vide order dated 19.07.2021. The LOI is now
valid up to 07.09.2021. The mining plan has been approved by the SME, Kota vide letter
dated 08.07.2019. ME, Bundi II in his certificate dated 05.08.2019 has stated that the mining
lease does not fall in Aravalli hills. Range Officer, Ramgarh WLS, in his letter dated
29.06.2021 addressed to DCF, WL, Kota has stated that Ramgarh WLS is at a distance of
38.69 Km from the applied lease area. DCF, MNP, Kota in his certificate dated 22.07.2021
has stated that the MHTR is at a distance of 5.33 Km from the applied lease area.
The SEAC also went through para 4 (i)/ (ii)/ (iii) and (iv) of the OM dated
08.08.2019 of the MoEF & CC which requires that the Expert Appraisal Committee would
examine the proposal from environmental angle including impact of developmental activity/
project on the Wildlife and its habitat, if any, and recommend appropriate protection and
conservation measures and that these recommendations shall be explicitly mentioned in the
EC letter. Since the project falls within a distance of 10 Km from the boundary of National
Park/ Wildlife Sanctuary and outside notified ESZ, the following specific conditions shall
also be applicable in terms of OM dated 08.08.2019 of the MoEF & CC:
1. The mining activity should be carried out in a manner so that the water
regime/system of the sanctuary is not disturbed. The mining activity should not
adversely affect any existing water course, water body, catchment etc. The PP
shall while carrying out mining activity ensure compliance of the provisions of
Air (Prevention and Control of Pollution) Act 1981, Water (Prevention and
Control of Pollution) Act 1974 and the Environment (Protection) Act, 1986 so that
the wildlife in the area is not adversely affected.
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.)
No. of
Trees
1st Year 2.985 2985 -- -- 2.985 2985
2nd Year 2.985 2985 -- -- 2.985 2985
3rd Year 2.985 2985 -- -- 2.985 2985
Total 8.955Hect. 8955 -- -- 8.955Hect. 8955
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
13. Budgetary
breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point
Presentation
Sr. No. Facility provided for Labour Capital Cost in
Rs. Recurring cost in Rs.
1. Drinking water facility 2,00,000/- 2,00,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
3,00,000/- 3,00,000/-
3. Education for Labour children 70,000/- 70,000/-
4. Safety equipment like Ear plug, Dust mask, hand gloves, Safety Shoes etc.
90,000/- 90,000/-
Total 6,60,000 6,60,000
14. Present
Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
2. The processes like blasting, drilling, excavation, transport and haulage resulting
into noise, should be carried out in such an manner so that such activities do not
disturb wild animals and birds particularly during sunset to sunrise. The level of
noise should be kept within the permissible limits.
3. The mining activity should not create any obstacle in the way of free movement of
wildlife and adversely affect wildlife corridors.
4. The mineral waste/ slurry should be dumped only at the designated places only
and such waste dumps should be reclaimed in accordance with the conditions of
the mining plan/ consent issued by the RSPCB under the Water and Air act.
5. The PP shall cooperate with the concerned DCF, Wildlife in their efforts towards
protection and conservation of wildlife in the Sanctuary/ Park.
6. The PP shall ensure that the transporter and labor employed by him should not
damage flora and fauna in the ESZ and the Wildlife Sanctuary/ National Park.
The PP during presentation informed that he has submitted Wildlife conservation plan
to the respective DCF, on 27.07.2021 in terms of guidelines dated 24.05.2019 issued by the
Chief Wildlife Warden, Rajasthan, Jaipur.
The particulars of project of Sh. Nana Lal Dhakar, are as follows:
S
.
N
o.
Partic
ulars
Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B1
2. Location of the Project
Near village – Bhawanipura, Tehsil: Talera, District: Bundi (Rajasthan)
3. Project Detail
s M.L No./ Production Capacity
Ref. No. : 2018100001552 Khasra No. : 138 & 140 Area : 1.0023HECT.
Production (TPA) : 135662 TPA(ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Projec
t Cost
Project Cost: Rs 0.80 Cr./-(in Rs.)
Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water requirement & Source
Total water requirement is about 4.0 KLD= 1.5 KLD (Drinking & Domestic Uses) + 1.5 KLD (Plantation) + 1.0 KLD (Dust Suppression), Water for Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel & Energy
Diesel will be used for transportation vehicles.
7. Application no., Date
of Documents
Category : B1 SEAC FILE NO. : 16617 Date of documents Submitted : 16/03/2021 SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 19 Date of Presentation : 28/07/2021
Final minutes of 4.95th meeting held on 27-29 July, 2021
Submitted
8. Informatio
n about Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019.
9. Date of
Air, Water, Noise, monitoring
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
10. Informa
tion about 500 mts composite map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter No.
ME/Bundi/Map/2019/65 dated 05/08/2019 Area falling within 500 mts 27.1351ha.
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 5.60 lacs Recurring Cost: Rs. 5.60 lacs per annum.
Sl. No Description Measures Capital Cost (Rs. In lakhs)
Recurring Cost (in
lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling Planting plant species
which can control air pollution along the approach road.
1.60
0.20 0.20
1.60
0.20 0.20
2
Water Pollution Control
Septic tanks for workers 0.30 0.30
3 Green Belt Development
Barrier zone Near lease area 0.50 0.50
4 Water Tanks for cattles
Tanks will be made for
animal water drinking 0.20 0.20
5 Occupational health
Medical facilities including periodic health checkups and first aid facility for labors.
0.40 0.40
6
Ramps Garland Drain Rainwater harvesting
For protection while loading and transporting the mineral ramp will be constructed.
1.00 1.00
7
Govt. Sr. Sec. School at village Ganeshpura
Repair of School Building
Furniture (Tables & Chairs)
0.80 0.80
8
Sub health centre, Bhawanipura
Medicine and Medical equipments
Sanitary Pads 0.30 0.30
9.
Village Devlopment, Bhawanipura
Cleanliness
Drinking water
Public toilets
0.10 0.10
Total 5.60 5.60
Final minutes of 4.95th meeting held on 27-29 July, 2021
Resolution
The SEAC, upon appraisal of the project and having regard to the information contained in
Form-1, Form-2, final EIA/ EMP reports and other documents, submitted by the PP and
presentation made by the PP/ Consultant, resolved to recommend to SEIAA for (1.) Approval
of EIA/ EMP with respect to Bhawanipura & Sutra Sandstone & Khanda Cluster No. 1 as
mentioned by SME, Kota in certificate dated 08.07.2021, having Cluster area of 27.1351 ha.,
and comprising 8 mining leases, with consolidated carrying capacity of 11,75,891.58 TPA.
(2.) Grant of EC to Shri Nana Lal Dhakar, Co-owners– 1. Shri Jagdish Chand Dhakar, 2. Shri
Rekh Lal Darad, 3. Shri Basanti Lal, for Bhawanipura Sandstone & Khanda Mining Project,
Ref. No. 2018100001552, area- 1.0023 ha., Production Capacity 1,35,662 TPA (ROM)
at Khasra No. 138 & 140, Near Village– Bhawanipura, Tehsil– Talera, Dist.- Bundi, (Raj.)
(Proposal No. 61904), covered under the above mentioned cluster comprising total lease area
of 27.1351 ha., with the stipulation that the PP shall abide by the annual production scheduled
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt & Plantation
Expenditure of Green Belt Rs 50,000/- Total green belt will be the 33% of the mine area 0.330 ha shall be planted in the Remaining Part of Own khatedari land ai village Bhawanipura in Khasra No.138,140 & with association. Native specie which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Peepal (Ficus religiosa), Mango (Mangifera indica ), Shisham ( Dalbergia sissoo
) etc.
Source- district survey report.
Yea
r
Outside the lease area( Part of Own khatedari land ai village
Bhawanipura in Khasra No.138,140 & with association)
Top Soil
Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.
)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
1st
Yea
r
0.11 110
-- --
0.11 110
2nd
Yea
r
0.11 110 -- -- 0.11 110
3rd
Yea
r
0.11 110 -- -- 0.11 110
Tot
al
0.330 Hect. 330 -- -- 0.330
Hect.
330
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining operations,
undertake re-grassing the mining area and any other area which may have been disturbed due to their
mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetary break
up for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr. No. Facility provided for Labour Capital Cost in Rs. Recurring cost in Rs.
1. Drinking water facility 20,000/- 20,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
30,000/- 30,000/-
3. Education for Labour children 20,000/- 20,000/-
4. Safety equipment like Ear plug, Dust mask,
hand gloves, Safety Shoes etc.
10,000/- 10,000/-
Total 80,000/- 80,000/-
14. Present Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
specified in mining plan and that any deviation there in will render the PP liable for legal
action in accordance with Environment and Mining Laws, with the specific and general
conditions annexed at Annexure ‘A’. The PP shall also abide by the special conditions as
mentioned in OM dated 08.08.2019 and as noted in the above mentioned observations.
Besides the general conditions mentioned in Annexure “A” the SEAC also resolved to
recommend to SEIAA to impose following additional condition:
The PP/all lessees in the cluster shall abide by the mitigation and restoration measures
provided in the final Environment Impact Assessment and Environment Management plan
prepared for the cluster as a whole for Bhawanipura & Sutra Sandstone & Khanda Cluster
No.1, Total Cluster Area- 27.1351 ha., total no. of mining leases 8, Cluster Production
Capacity- 11,75,891.58 TPA, cluster project cost 4.35 Crores.
Agenda no. 20. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(16564)/ 2019-20
Project Name- Application for approval of EIA/ EMP with respect to Bhawanipura & Sutra
Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Devi Singh
for Sutra Sandstone & Khanda Mining Project, Ref. No.2018100001181, Area- 2.4111 ha.,
Production capacity- 2,68,528 TPA (ROM) at Khasra no-1081/208, 209, at village-Sutra,
Tehsil- Talera, Dist-Bundi, Rajasthan, (Proposal No-61918).
Project Proponent Name: Shri Devi Singh, Co-owners-1. Shri Pappu Singh S/o Shri Kajod
Singh, 2. Shri Mukesh Singh S/o Shri Kajod Singh 3. Shri Bablu singh S/o Shri Kajod Singh,
Add Sutra, Tehsi-Talera, Dist-Bundi, Rajasthan, [email protected].
Consultant Name- Cognizance Research India Private Ltd.(Accredited by NABET, Govt. of
India Accredited No. NABET/EIA/1619/IA006, Valid up to Aug 18, 2019)Office GT-20, Sec
177, Noida- 201301 (U.P.)email:- [email protected]
Observations of the committee:-
The SEAC considered for approval of EIA/ EMP with respect to Bhawanipura &
Sutra Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Devi Singh
for Sutra Sandstone & Khanda Mining Project, Ref. No.2018100001181, Area- 2.4111 ha.,
Production capacity- 2,68,528 TPA (ROM) at Khasra no- 1081/208, 209, at village-Sutra,
Tehsil- Talera, Dist- Bundi, Rajasthan, (Proposal No-61918), in its 4.95th meeting held on
28.07.2021 through VC/ electronic media in accordance with letter dated 27.05.2020 of
SEIAA, Rajasthan.
The project was also considered earlier in terms of OM dated 12.12.2018 of the MoEF
& CC by SEAC in its 4.40th meeting held on 09-11 and 15-17 June, 2020 prescribing ToR for
undertaking EIA studies and for preparing EMP as the size of the cluster in which the
proposed project lies exceeded 5.0 ha. The SEAC vide letter dated 26.06.2020 asked the PP
to conduct EIA studies and prepare EMP for the entire cluster in order to capture all the
possible externalities.
Final minutes of 4.95th meeting held on 27-29 July, 2021
One season post monsoon primary base line data of the ambient air quality PM2.5,
PM10, SO2 and NOX, Water Quality, Noise level, Soil quality and Flora and Fauna were
collected during Oct. 2019 to Dec. 2019.
The PP following the above decision got public notice published in 04.12.2020
edition of Dainik Bhaskar, Bundi and 04.12.2020 edition of Jaabaz Patrika, Bundi and for
holding public hearing for the entire cluster for ascertaining material concerns for local
affected persons and it such concerns into account in the EIA/EMP report.
Public hearing was accordingly held on 08.01.2021 at 03.30 PM at Gram panchayat
Office, Sutda “Jan Suvida Kendra Sutda”, Tehsil Talera and District Bundi, for the entire
cluster and with reference to application for EC for mining activity by Bhawanipura & Sutra
Sandstone & Khanda Mining Project, (Cluster no.-1, Cluster area- 27.1351 ha.), Ref.
No.2018100001181, Area- 2.4111 ha., Production capacity- 2,68,528 TPA (ROM) at Khasra
no-1081/208, 209, at village-Sutra, Tehsil- Talera, Dist-Bundi, Rajasthan, under the
Chairmanship of Sh. Amanullah Khan, Add. District Collector, Bundi and Sh. Rakesh Gupta,
Regional officer, RSPCB, Kota, was also present during public hearing.
The details of issue raised by the public and commitments made by the PP during
public hearing and the action plan for implementation thereof are as follows:-
S.
No.
Name of Person with
address
Queries/Suggestions Replies Time bound plan of
action with
financial allocation
for cluster
1. Shri Papu Singh, Sutra What will be done to
prevent dust from
mining work ?
In the project, water
will be sprinkled on
the roads by tanker
and plantation will be
done nearby to
prevent dust from
blowing.
Financial Allocation
1,80,000/- Rupees
for water Sprinkling.
2. What will be done for
the animals ?
Tanks will be made
for animal water
drinking and if fodder
is needed in summer
provision has been
made to arrange
through CSR.
Allocation
1,00,000/- Rupees
per year for Tanks for
animal water
drinking .
3. Shri Kanhaiya Lal
Prajapati, Sutra
If mining operation will
be start, what
arrangements made for
school children?
In the initial time, the
applicant shall be
arrange computer,
books and notebooks
for the children of
village – Sutra,
Allocation
4,50,000/- Rupees
for Schools.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Bhawanipura, Dabi
under CSR activity
4 Shri Kamal Kishor
Meena (SDM, Bundi)
SDM asked to project
proponent, you have
been told that 33% of
the plantation will be
done in the mining
area, will it be done on
the mines or can be
done in other places
also?
Plantation can be
done wherever land is
available mining area
and around the
mining area.
If land is not
available, Plantation
can also be done by
taking land from the
district
administration.
Allocation
1,80,000/- Rupees
for plantation.
5 SDM asked to project
proponent, Will you
keep the stairway
structure in the mining
pit or not ?
Staircase structures
are made in the
mining pit so that no
accidents occur.
The PP following issue of ToR, has submitted application for obtaining EC along with
the final EIA/ EMP report and the proceedings of public hearing on 13.03.2021.
The Bhawanipura & Sutra Sandstone & Khanda Cluster No. 1 as mentioned by SME,
Kota in certificate dated 27.07.2021 has Cluster area 27.1351 ha., and comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA.
The particulars of individual mining/ leases including their budget for EMP/
Labour welfare, which area part of cluster no.1 are as follows:
Sr.
No
.
Name
of
Holder
of
LOI/QL
/ML/Re
f. No.
LOI/QL
/
ML
No./Ref.
No.
Date of
Sanctio
n
Name of
Mineral
Area (in Ha) Khasra No. Prod
uctio
n
Capa
city
Project
Cost
(in Cr.)
Weather EC
obtained if
yes, Name of
Authority
and Date
Budg
et for
EMP
(Recu
rring
) (in
Rs)
Budge
t for
Green
Belt
Devel
opme
nt (in
Rs)
Budget
for
Labour
Welfare
(in Rs)
1. Shri
Nanda
Karad
Ref. no.
2018100
00631
1/10/201
8
Sandstone
& Khanda 2.4353 192
4,84,
415
0.80 Now applied
5,60,0
00 60,000 110000
2
Shri
Nana
Lal
Dhakar
Ref. no.
2018100
001552
8/02/201
9
Sandstone
& Khanda 1.0023 138, 140 1,35,
662
0.80 Now applied
5,60,0
00 55,000 100000
Final minutes of 4.95th meeting held on 27-29 July, 2021
3
Shri
Devi
Singh
Ref. no.
2018100
001181
10/01/20
19
Sandstone
2.4111 1081/208,
209
2,68,
528
0.50 Now applied
3,50,0
00 40,000 100000
4.
M/s
Shivam
Stone
M.L.No.
04/2013
26/02/20
14
Sandstone
4.8988
177,178,179
,180,181,44
6/182
70,00
0
0.40
F-
1/DEIAA/Bu
ndi/2018/85-
115 on dated
23/03/2018
1,70,0
00 30,000 100000
5
M/s
Leonard
Minerals
& Exim
PVT.
LTD.
M.L.No.
09/2012 03/04/13
Sandstone
4.0018
172,173,169 20,18
8.2
0.75
F-
1/DEIAA/Bu
ndi/2018/161
-191 on dated
06/09/2018
2,00,0
00 30,000 100000
6
Smt.
Angur
Bala
Jain
M.L.No.
3/2014
1/09/201
7
Sandstone
4.1005
236,237,109
0/232,1089/
232,822,112
5/823,807
79,15
8
0.25
F(14)/DEIA
A/SEIAA/SE
AC-
Raj/Sectt/Pro
ject/Cat.1(A)
B2(EC) 14-
15 on dated
30/11/2016
2,05,0
00 25,000 50000
7
M/s
Panna
Stone
Supplie
rs
M.L.No.
03/2013
26/09/20
13
Sandstone
4.0266 163,164,165
,152
60,00
0
0.25
F(14)/DEIA
A/SEIAA/SE
AC-
Raj/Sectt/Pro
ject/Cat.1(A)
B2(EC) 14-
15 on dated
30/11/2016
2,05,0
00 25,000 50000
8 M/s
Dev
Stone
M.L.No.
05/2013
28/03/20
18
Sandstone
4.2587 197,197/2,1
98,194/2
5794
0.38
0.60
F-
1/DEIAA/Bu
ndi/2018/85-
115 on dated
23/03/2018
1,80,0
00 20,000 50000
The SME, Kota vide letter dated 08.07.2021 has approved mining plan for mining of
Sandstone and Khanda with respect to the said cluster. According to the information
submitted by the PP, mining leases covered under the cluster do not fall in Aravalli hills and
that there is no National Park/ Wildlife Sanctuary within the periphery of 10 Km from the
mining leases in the cluster. The PP has given an undertaking that cluster EMP shall be
implemented by the LOIs/ mining lease holders collectively in consultation and supervision
of the concerned Mining Engineer.
The particulars of EMP with respect to cluster No. 1, are as follows:
S.
No
.
Particula
rs
Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B1
2. Location of the Project
Near village – Bhawanipura & Sutra, Tehsil: Talera, District: Bundi (Rajasthan)
Final minutes of 4.95th meeting held on 27-29 July, 2021
3. Project Details M.L No./ Production
Capacity
S.
No.
Name of
Proponents
Ref. & ML. No Area
(Hect.)
Production
Capacity in
Tonnes
(ROM)
Project
Cost
(crore)
1. Shri Nanda
Karad 201810000631 2.4353 4,84,415 0.80
2. Shri Nana Lal
Dhakar 2018100001552 1.0023 1,35,662 0.80
3. Shri Devi Singh 2018100001181 2.4111 2,68,528 0.50
4. M/s Shivam
Stone 04/2013 4.8988 70,000 0.40
5.
M/s Leonard
Minerals &
Exim PVT. LTD.
09/2012 4.0018 20,188.2 0.75
6. Smt. Angur
Bala Jain 3/2014 4.1005 79,158 0.25
7.
M/s Panna
Stone
Suppliers
3/2013 4.0266 60,000 0.25
8. M/s Dev Stone 5/2013 4.2587 57940.38 0.60
Total 27.1351 1175891.58 4.35
4. Project
Cost S. No. Name of
Proponents Ref. & ML. No Project Cost
(crore)
1. Shri Nanda Karad 201810000631 0.80
2. Shri Nana Lal Dhakar 2018100001552 0.80
3. Shri Devi Singh 2018100001181 0.50
4. M/s Shivam Stone 04/2013 0.40
5. M/s Leonard Minerals
& Exim PVT. LTD. 09/2012 0.75
6. Smt. Angur Bala Jain 3/2014 0.25
7. M/s Panna Stone
Suppliers 3/2013 0.25
8. M/s Dev Stone 5/2013 0.60
Total 4.35
5. Water requirement & Source
S.
N
o
Activities
Average demand KLD
0063
1
00155
2
00118
1
04/1
3
09/1
2
3/1
4
3/1
3
5/1
3
1
Dust
Suppressio
n
1.5 1.0 1.0 1.5 1.0 2.5 2.5 1.5
2 Green Belt 1.5 1.5 1.0 2.0
1.0 3.0 3.0 2.5
3
Drinking &
Domestic
use
2.0 1.5 2.0
2.5
1.5
3.5 3.5 3.0
Total 5.0 4.0 4.0 6.0 3.5 9.0 9.0 7.0
Total water demand of cluster (8 lease) = 47.5 KLD
Source: Water will be made available by nearby village Bhawanipura & Sutra through water tanker.
6. Fuel &
Energy
Diesel operated machinery will be used. Fuel will be required for the operation of mines machineries and
transportation vehicles which will be taken care by the contractor itself. 15 KVA of DG set also proposed. Electricity connection will be taken from the concerned electricity department. For mining leases already operational electricity connection has already been taken.
7. Application no., Date of Document
s Submitted
Category : B1 SEAC FILE NO. : 16617,16564,15883 Date of documents Submitted : 16/03/2021 SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 19,20,21 Date of Presentation : 28/07/2021
8. Information about Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019, ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019, ME/Bundi/Map/2019/58 dated 23/07/2019.
9. Date of
Air,
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Water, Noise, monitoring
10. Information about 500 mts composite map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019 , ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019, ME/Bundi/Map/2019/58 dated 23/07/2019. Area falling within 500 mts 27.1351ha.
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 24.3 lacs Recurring Cost: Rs. 24.3 lacs per annum.
Sl. No
Description Measures
Capital Cost (Rs. In lakhs)
Recurring Cost(in lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling
Planting plant species which can control air pollution along the approach road.
6.40
1.00 1.30
6.40
1.00 1.30
2 Water Pollution Control
Septic tanks for workers
1.00 1.00
3 Green Belt Development
Barrier zone
Near lease area 1.50 1.50
4 Water Tanks for cattles
Tanks will be made for animal water drinking 1.00 1.00
5 Occupational health
Medical facilities including periodic health checkups and first aid facility for labors.
1.90 1.90
6
Ramps Garland Drain Rainwater harvesting
For protection while loading and transporting the mineral ramp will be constructed.
2.20 2.20
7
Govt. Sr. Sec. School at village Ganeshpura
Repair of School Building & Room Construction
Solar Power Plant 2KW
Furniture (Tables & Chairs) & Computers
3.50 3.50
8 Sub health centre, Bhawanipura
Medicine and Medical equipments
Sanitary Pads 2.50 2.50
9
Village Devlopment, Bhawanipura& Sutra
Cleanliness
Drinking water
Public toilets 2.00 2.00
Total 24.3 24.3
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt & Plantation
Total green belt will be the 33% of the mine area 8.955 ha of the area shall be carried out near lease area and trees shall be planted both side of the road connected to mine, Statutory Barrier & Part of own khatedari land at village Bhawanipura & Sutra in 192,138,140, 209, 446/182, 169, 236, 164, 197 & with join venture association Native species which are more suitable to the local environment are
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for approval of EIA/EMP and EC with respect to
Sutra Sandstone & Khanda Mining Project, Ref. No.2018100001181, Area- 2.4111 ha.,
Production capacity- 2,68,528 TPA (ROM) at Khasra no- 1081/208, 209, at village-Sutra,
Tehsil- Talera, Dist-Bundi, Rajasthan, (Proposal No-61918). The SME, Kota vide order
dated 10.01.2019 has issued LoI to the PP having validity of a period of 18 months. The
validity of LOI has been extended vide order dated 20.07.2021. The LOI is now valid up to
09.10.2021. The mining plan has been approved by the SME, Kota vide letter dated
20.02.2019. ME, Bundi I in his certificate dated 19.08.2019 has stated that the mining lease
does not fall in Aravalli hills. Range Officer, Ramgarh WLS, in his letter dated 29.06.2021
addressed to DCF, WL, Kota has stated that Ramgarh WLS is at a distance of 39.15 Km from
the applied lease area. DCF, MNP, Kota in his certificate dated 22.07.2021 has stated that the
MHTR is at a distance of 4.43 Km from the applied lease area.
The SEAC also went through para 4 (i)/ (ii)/ (iii) and (iv) of the OM dated 08.08.2019
of the MoEF & CC which requires that the Expert Appraisal Committee would examine the
proposal from environmental angle including impact of developmental activity/ project on the
Wildlife and its habitat, if any, and recommend appropriate protection and conservation
measures and that these recommendations shall be explicitly mentioned in the EC letter.
Since the project falls within a distance of 10 Km from the boundary of National Park/
Wildlife Sanctuary and outside notified ESZ, the following specific conditions shall also be
applicable in terms of OM dated 08.08.2019 of the MoEF & CC:
1. The mining activity should be carried out in a manner so that the water
regime/system of the sanctuary is not disturbed. The mining activity should not
adversely affect any existing water course, water body, catchment etc. The PP
preferred to be planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Mango (Mangifera Indica), Amla (Phyllanthus Emblica) etc. it is the proposed to invest 2 Lac. Rs. Per annum for greenbelt development.
Year
Along the lease boundary &
Outside the lease area Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.)
No. of
Trees
1st Year 2.985 2985 -- -- 2.985 2985
2nd Year 2.985 2985 -- -- 2.985 2985
3rd Year 2.985 2985 -- -- 2.985 2985
Total 8.955Hect. 8955 -- -- 8.955Hect. 8955
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
13. Budgetary
breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point
Presentation
Sr. No. Facility provided for Labour Capital Cost in
Rs. Recurring cost in Rs.
1. Drinking water facility 2,00,000/- 2,00,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
3,00,000/- 3,00,000/-
3. Education for Labour children 70,000/- 70,000/-
4. Safety equipment like Ear plug, Dust mask, hand gloves, Safety Shoes etc.
90,000/- 90,000/-
Total 6,60,000 6,60,000
14. Present
Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
shall while carrying out mining activity ensure compliance of the provisions of
Air (Prevention and Control of Pollution) Act 1981, Water (Prevention and
Control of Pollution) Act 1974 and the Environment (Protection) Act, 1986 so that
the wildlife in the area is not adversely affected.
2. The processes like blasting, drilling, excavation, transport and haulage resulting
into noise, should be carried out in such an manner so that such activities do not
disturb wild animals and birds particularly during sunset to sunrise. The level of
noise should be kept within the permissible limits.
3. The mining activity should not create any obstacle in the way of free movement of
wildlife and adversely affect wildlife corridors.
4. The mineral waste/ slurry should be dumped only at the designated places only
and such waste dumps should be reclaimed in accordance with the conditions of
the mining plan/ consent issued by the RSPCB under the Water and Air act.
5. The PP shall cooperate with the concerned DCF, Wildlife in their efforts towards
protection and conservation of wildlife in the Sanctuary/ Park.
6. The PP shall ensure that the transporter and labor employed by him should not
damage flora and fauna in the ESZ and the Wildlife Sanctuary/ National Park.
The PP during presentation informed that he has submitted Wildlife conservation plan
to the respective DCF, on 27.07.2021 in terms of guidelines dated 24.05.2019 issued by the
Chief Wildlife Warden, Rajasthan, Jaipur.
The particulars of project of Sh. Devi Singh, are as follows:
S.
No
.
Particula
rs
Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B1
2. Location of the Project
Near village – Sutra, Tehsil: Talera, District: Bundi (Rajasthan)
3. Project
Details M.L No./ Production Capacity
Ref. No. : 2018100001181
Khasra No. : 1081/208, 209 Area : 2.4111HECT.
Production (TPA) : 268528 TPA(ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Project Cost
Project Cost: Rs 0.50 Cr./-(in Rs.) Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water requirement & Source
Total water requirement is about 4.0 KLD= 2.0 KLD (Drinking & Domestic Uses) + 1.0 KLD (Plantation) + 1.0 KLD (Dust Suppression), Water for Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel & Energy
Diesel will be used for transportation vehicles.
7. Applicatio
n no., Date of Documents Submitted
Category : B1
SEAC FILE NO. : 16564 Date of documents Submitted : 16/03/2021 SEAC Meeting No. : 4.95th Meeting Agenda Sr. No. : 20 Date of Presentation : 28/07/2021
8. Information about
Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No. ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019.
9. Date of Air, Water,
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Noise, monitoring
10. Information
about 500 mts composite map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter No.
ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019 Area falling within 500 mts 27.1351ha.
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 3.50 lacs Recurring Cost: Rs. 3.50 lacs per annum.
Sl. No Description Measures Capital Cost (Rs. In lakhs)
Recurring Cost (in
lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling Planting plant species
which can control air pollution along the approach road.
1.00
0.20 0.20
1.00
0.20 0.20
2
Water Pollution Control
Septic tanks for workers 0.30 0.30
3 Green Belt Development
Barrier zone Near lease area 0.30 0.30
4 Water Tanks for cattles
Tanks will be made for
animal water drinking 0.20 0.20
5 Occupational health
Medical facilities
including periodic health checkups and first aid facility for labors.
0.40 0.40
6
Govt. Sr. Sec. School at village Ganeshpura
Repair of School
Building
0.50 0.50
7 Sub health centre, Sutra
Medicine and Medical equipments
Sanitary Pads 0.30 0.30
8
Village Devlopment, Sutra
Cleanliness
Drinking water
Public toilets
0.10 0.10
Total 3.50 3.50
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt & Plantation
Expenditure of Green Belt Rs 40,000/- Total green belt will be the 33% of the mine area 0.795 ha shall be planted in the Remaining Part of
Own khatedari land ai village Sutra in Khasra No 209 & with association.
Native specie which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Peepal (Ficus religiosa), Mango (Mangifera indica ), Shisham ( Dalbergia sissoo ) etc.
Year
Outside the lease area( Part
of Own khatedari land ai
village Sutra in Khasra No
209 & with association)
Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.)
No. of
Trees
Final minutes of 4.95th meeting held on 27-29 July, 2021
Resolution:
The SEAC, upon appraisal of the project and having regard to the information
contained in Form-1, Form-2, final EIA/ EMP reports and other documents, submitted by the
PP and presentation made by the PP/ Consultant, resolved to recommend to SEIAA for (1.)
Approval of EIA/ EMP with respect to Bhawanipura & Sutra Sandstone & Khanda mine
Cluster No.1 as mentioned by SME, Kota in certificate dated 08.07.2021, having Cluster area
27.1351 ha., and comprising 8 mining leases, with consolidated carrying capacity of
11,75,891.58 TPA and (2.) Grant of EC to Shri Devi Singh, Co-owners- 1. Shri Pappu Singh
S/o Shri Kajod Singh, 2. Shri Mukesh Singh S/o Shri Kajod Singh, 3. Shri Bablu singh S/o
Shri Kajod Singh, for Sutra Sandstone & Khanda Mining Project, Ref. No.2018100001181,
Area- 2.4111 ha., Production capacity- 2,68,528 TPA (ROM) at Khasra no-1081/208, 209, at
village-Sutra, Tehsil- Talera, Dist-Bundi, Rajasthan, (Proposal No-61918), covered under the
above mentioned cluster comprising total lease area of 27.1351 ha., with the stipulation that
the PP shall abide by the annual production scheduled specified in mining plan and that any
deviation there in will render the PP liable for legal action in accordance with Environment
and Mining Laws, with the specific and general conditions annexed at Annexure ‘A’. The PP
shall also abide by the special conditions as mentioned in OM dated 08.08.2019 and as noted
in the above mentioned observations.
Besides the general conditions mentioned in Annexure “A” the SEAC also resolved to
recommend to SEIAA to impose following additional condition:
The PP/all lessees in the cluster shall abide by the mitigation and restoration measures
provided in the final Environment Impact Assessment and Environment Management plan
prepared for the cluster as a whole for Bhawanipura & Sutra Sandstone & Khanda Cluster
No. 1, Total Cluster Area- 27.1351 ha., total no. of mining leases 8, Cluster Production
Capacity- 11,75,891.58 TPA, cluster project cost 4.35 Crores.
Agenda no. 21. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(15883)/ 2019-20
1st Year 0.265 265 -- -- 0.265 265
2nd Year 0.265 265 -- -- 0.265 265
3rd Year 0.265 265 -- -- 0.265 265
Total 0.795 Hect. 795 -- -- 0.795
Hect.
795
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
13. Budgetary breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr. No. Facility provided for Labour Capital Cost in
Rs. Recurring cost in
Rs.
1. Drinking water facility 15,000/- 15,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
20,000/- 20,000/-
3. Education for Labour children 10,000/- 10,000/-
4. Safety equipment like Ear plug, Dust mask, hand gloves, Safety Shoes etc.
5,000/- 5,000/-
Total 50,000/- 50,000/-
14. Present Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
Project Name- Application for approval of EIA/ EMP with respect to Bhawanipura & Sutra
Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Nanda Karad
for Bhawanipura Sandstone & Khanda Mining Project, Ref. No. 201810000631, Area-
2.4353 ha., Production Capacity- 4,84,415 TPA (ROM) at Khasra no 192, Vill.-
Bhawanipura, Tehsil- Talera, Distt.- Bundi, State- Rajasthan (Proposal No- 61787).
Project Proponent Name- Shri Nanda Karad, Co-applicant 1. Sh. Prabhu, 2. Smt. Aijan Bai,
3. Smt. Sosar Bai, 4. Smt. Motiya Bai, Vill.- Sutra Tehsil- Talera, Distt.- Bundi (Raj.),
Consultant Name- COGNIZANCE RESEARCH INDIA PRIVATE LTD., GT-20, Sec-117,
Noida-(U.P.) Email. [email protected].
Observations of the committee:-
The SEAC considered for approval of EIA/ EMP with respect to Bhawanipura &
Sutra Sandstone & Khanda mine Cluster No.1, Cluster area 27.1351 ha., comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA and EC to Shri Nanda Karad
for Bhawanipura Sandstone & Khanda Mining Project, Ref. No. 201810000631, Area-
2.4353 ha., Production Capacity- 4,84,415 TPA (ROM) at Khasra no 192, Vill.-
Bhawanipura, Tehsil- Talera, Distt.- Bundi, State- Rajasthan (Proposal No- 61787), in its
4.95th meeting held on 28.07.2021 through VC/ electronic media in accordance with letter
dated 27.05.2020 of SEIAA, Rajasthan.
The project was also considered earlier in terms of OM dated 12.12.2018 of the MoEF
& CC by SEAC in its 4.18th meeting held on 06th August, 2019 prescribing ToR for
undertaking EIA studies and for preparing EMP as the size of the cluster in which the
proposed project lies exceeded 5.0 ha. The SEAC vide letter dated 27.08.2019 asked the PP
to conduct EIA studies and prepare EMP for the entire cluster in order to capture all the
possible externalities.
One season post monsoon primary base line data of the ambient air quality PM2.5,
PM10, SO2 and NOX, Water Quality, Noise level, Soil quality and Flora and Fauna were
collected during Oct. 2019 to Dec. 2019.
The PP following the above decision got public notice published in 04.12.2020
edition of Dainik Bhaskar, Bundi and 04.12.2020 edition of Jaabaz Patrika, Bundi and for
holding public hearing for the entire cluster for ascertaining material concerns for local
affected persons and it such concerns into account in the EIA/EMP report.
Public hearing was accordingly held on 08.01.2021 at 03.30 PM at Gram panchayat
Office, Sutda “Jan Suvida Kendra Sutda”, Tehsil Talera and District Bundi, for the entire
cluster and with reference to application for EC for mining activity by Bhawanipura & Sutra
Sandstone & Khanda Mining Project, (Cluster no.-1, Cluster area- 27.1351 ha.) Reference
No. 201810000631, Area-2.4353 ha., Production Capacity- 4,84,415 TPA (ROM) at Khasra
no 192, Vill.- Bhawanipura, Tehsil- Talera, Distt.- Bundi, State- Rajasthan, under the
Chairmanship of Sh. Amanullah Khan, Add. District Collector, Bundi and Sh. Rakesh Gupta,
Regional officer, RSPCB, Kota, was also present during public hearing.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The details of issue raised by the public and commitments made by the PP during
public hearing and the action plan for implementation thereof are as follows:-
S.
No.
Name of Person with
address
Queries/Suggestions Replies Time bound plan of
action with
financial allocation
for cluster
1. Shri Papu Singh, Sutra What will be done to
prevent dust from
mining work ?
In the project, water
will be sprinkled on
the roads by tanker
and plantation will be
done nearby to
prevent dust from
blowing.
Financial Allocation
1,80,000/- Rupees
for water Sprinkling.
2. What will be done for
the animals ?
Tanks will be made
for animal water
drinking and if fodder
is needed in summer
provision has been
made to arrange
through CSR.
Allocation
1,00,000/- Rupees
per year for Tanks for
animal water
drinking .
3. Shri Kanhaiya Lal
Prajapati, Sutra
If mining operation will
be start, what
arrangements made for
school children?
In the initial time, the
applicant shall be
arrange computer,
books and notebooks
for the children of
village – Sutra,
Bhawanipura, Dabi
under CSR activity
Allocation
4,50,000/- Rupees
for Schools.
4 Shri Kamal Kishor
Meena (SDM, Bundi)
SDM asked to project
proponent, you have
been told that 33% of
the plantation will be
done in the mining
area, will it be done on
the mines or can be
done in other places
also?
Plantation can be
done wherever land is
available mining area
and around the
mining area.
If land is not
available, Plantation
can also be done by
taking land from the
district
administration.
Allocation
1,80,000/- Rupees
for plantation.
Final minutes of 4.95th meeting held on 27-29 July, 2021
5 SDM asked to project
proponent, Will you
keep the stairway
structure in the mining
pit or not ?
Staircase structures
are made in the
mining pit so that no
accidents occur.
The PP following issue of ToR, has submitted application for obtaining EC along with
the final EIA/ EMP report and the proceedings of public hearing on 13.03.2021 .
The Bhawanipura & Sutra Sandstone & Khanda Cluster No. 1 as mentioned by SME,
Kota in certificate dated 27.07.2021 has Cluster area 27.1351 ha., and comprising 8 mining
leases, with consolidated carrying capacity of 11,75,891.58 TPA.
The particulars of individual mining/ leases including their budget for EMP/
Labour welfare, which area part of cluster no.1 are as follows:
Sr
.
N
o.
Name
of
Holder
of
LOI/Q
L/ML/
Ref.
No.
1) Particulars of individual mining/Leases including their budget for EMP and labour welfare
LOI/Q
L/
ML
No./Re
f. No.
Date of
Sanctio
n
Name of
Mineral
Area (in
Ha)
Khasra
No.
Pro
duct
ion
Cap
acity
Project
Cost
(in Cr.)
Weather
EC
obtained if
yes, Name
of
Authority
and Date
Bud
get
for
EM
P
(Rec
urri
ng)
(in
Rs)
Budg
et for
Gree
n
Belt
Devel
opme
nt (in
Rs)
Budget
for
Labour
Welfare
(in Rs)
1. Shri
Nanda
Karad
Ref.
no.
201810
000631
1/10/20
18
Sandston
e &
Khanda
2.4353 192 4,84,
415
0.80 Now
applied
5,60,
000
60,00
0 110000
2
Shri
Nana
Lal
Dhakar
Ref.
no.
201810
000155
2
8/02/20
19
Sandston
e &
Khanda
1.0023 138, 140 1,35,
662
0.80 Now
applied
5,60,
000
55,00
0 100000
3
Shri
Devi
Singh
Ref.
no.
201810
000118
1
10/01/2
019
Sandston
e
2.4111 1081/208,
209
2,68,
528
0.50 Now
applied
3,50,
000
40,00
0 100000
4.
M/s
Shivam
Stone
M.L.N
o.04/20
13
26/02/2
014
Sandston
e
4.8988
177,178,17
9,180,181,
446/182
70,0
00
0.40
F-
1/DEIAA/
Bundi/2018
/85-115 on
dated
23/03/2018
1,70,
000
30,00
0 100000
Final minutes of 4.95th meeting held on 27-29 July, 2021
5
M/s
Leonar
d
Mineral
s &
Exim
PVT.
LTD.
M.L.N
o.09/20
12
03/04/1
3
Sandston
e
4.0018
172,173,16
9 20,1
88.2
0.75
F-
1/DEIAA/
Bundi/2018
/161-191
on dated
06/09/2018
2,00,
000
30,00
0 100000
6
Smt.
Angur
Bala
Jain
M.L.N
o.3/201
4
1/09/20
17
Sandston
e
4.1005
236,237,10
90/232,108
9/232,822,
1125/823,8
07
79,1
58
0.25
F(14)/DEI
AA/SEIAA
/SEAC-
Raj/Sectt/P
roject/Cat.1
(A)B2(EC)
14-15 on
dated
30/11/2016
2,05,
000
25,00
0 50000
7
M/s
Panna
Stone
Suppli
ers
M.L.N
o.03/20
13
26/09/2
013
Sandston
e
4.0266 163,164,16
5,152
60,0
00
0.25
F(14)/DEI
AA/SEIAA
/SEAC-
Raj/Sectt/P
roject/Cat.1
(A)B2(EC)
14-15 on
dated
30/11/2016
2,05,
000
25,00
0 50000
8 M/s
Dev
Stone
M.L.N
o.05/20
13
28/03/2
018
Sandston
e
4.2587 197,197/2,
198,194/2
5794
0.38
0.60
F-
1/DEIAA/
Bundi/2018
/85-115 on
dated
23/03/2018
1,80,
000
20,00
0 50000
The SME, Kota vide letter dated 08.07.2021 has approved mining plan for mining of
Sandstone and Khanda with respect to the said cluster. According to the information
submitted by the PP, mining leases covered under the cluster do not fall in Aravalli hills and
that there is no National Park/ Wildlife Sanctuary within the periphery of 10 Km from the
mining leases in the cluster. The PP has given an undertaking that cluster EMP shall be
implemented by the LOIs/ mining lease holders collectively in consultation and supervision
of the concerned Mining Engineer.
The particulars of EMP with respect to cluster No. 1, are as follows:
S.
No
.
Particula
rs
Details/Information
1. Cat./ Item
no. (in schedule):
1 (a)-B1
2. Location of the Project
Near village – Bhawanipura & Sutra, Tehsil: Talera, District: Bundi (Rajasthan)
3. Project Details
M.L No./ Productio
S. No.
Name of Proponent
s
Ref. & ML. No Area (Hect.)
Production
Capacity in Tonnes
Project Cost (crore)
Final minutes of 4.95th meeting held on 27-29 July, 2021
n Capacity
(ROM)
1. Shri Nanda
Karad 201810000631 2.4353 4,84,415 0.80
2. Shri Nana Lal
Dhakar 2018100001552 1.0023 1,35,662 0.80
3. Shri Devi
Singh 201810000118
1 2.4111 2,68,528 0.50
4. M/s Shivam
Stone 04/2013 4.8988 70,000 0.40
5.
M/s Leonard Minerals & Exim PVT.
LTD.
09/2012 4.0018 20,188.2 0.75
6. Smt. Angur Bala Jain
3/2014 4.1005 79,158 0.25
7. M/s Panna
Stone Suppliers
3/2013 4.0266 60,000 0.25
8. M/s Dev
Stone 5/2013 4.2587 57940.38 0.60
Total 27.135
1 1175891.58 4.35
4. Project Cost
S. No. Name of Proponents
Ref. & ML. No Project Cost (crore)
1. Shri Nanda Karad 201810000631 0.80
2. Shri Nana Lal Dhakar 2018100001552 0.80
3. Shri Devi Singh 2018100001181 0.50
4. M/s Shivam Stone 04/2013 0.40
5. M/s Leonard Minerals
& Exim PVT. LTD. 09/2012 0.75
6. Smt. Angur Bala Jain 3/2014 0.25
7. M/s Panna Stone
Suppliers 3/2013 0.25
8. M/s Dev Stone 5/2013 0.60
Total 4.35
5. Water requireme
nt & Source
S.
N
o
Activities
Average demand KLD
0063
1
00155
2
00118
1
04/1
3
09/1
2
3/1
4
3/1
3
5/1
3
1
Dust
Suppressio
n
1.5 1.0 1.0 1.5 1.0 2.5 2.5 1.5
2 Green Belt 1.5 1.5 1.0 2.0
1.0 3.0 3.0 2.5
3
Drinking &
Domestic
use
2.0 1.5 2.0
2.5
1.5
3.5 3.5 3.0
Total 5.0 4.0 4.0 6.0 3.5 9.0 9.0 7.0
Total water demand of cluster (8 lease) = 47.5 KLD
Source: Water will be made available by nearby village Bhawanipura & Sutra through water tanker.
6. Fuel & Energy
Diesel operated machinery will be used. Fuel will be required for the operation of mines machineries and transportation vehicles which will be taken care by the contractor itself. 15 KVA of DG set also proposed. Electricity connection will be taken from the concerned electricity department. For mining leases already operational electricity connection has already been taken.
7. Applicati
on no., Date of Documents Submitted
Category : B1
SEAC FILE NO. : 16617,16564,15883 Date of documents Submitted : 16/03/2021 SEAC Meeting No. : 4.95th Meeting Agenda Sr. No. : 19,20,21 Date of Presentation : 28/07/2021
Final minutes of 4.95th meeting held on 27-29 July, 2021
8. Information about Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019, ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019, ME/Bundi/Map/2019/58 dated 23/07/2019.
9. Date of Air, Water, Noise, monitoring
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
10. Information about 500
mts composite map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter No. ME/Bundi/Map/2019/65 dated 05/08/2019 , ME/Bundi-1/CC/Ri.N. 1181(2018)717 dated 19/08/2019,
ME/Bundi/Map/2019/58 dated 23/07/2019. Area falling within 500 mts 27.1351ha.
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 24.3 lacs Recurring Cost: Rs. 24.3 lacs per annum.
Sl. No
Description Measures
Capital Cost (Rs. In lakhs)
Recurring Cost(in lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling
Planting plant species
which can control air pollution along the approach road.
6.40
1.00 1.30
6.40
1.00 1.30
2 Water Pollution Control
Septic tanks for workers
1.00 1.00
3 Green Belt Development
Barrier zone
Near lease area 1.50 1.50
4 Water Tanks for cattles
Tanks will be made for
animal water drinking 1.00 1.00
5 Occupational health
Medical facilities
including periodic health checkups and first aid facility for labors.
1.90 1.90
6
Ramps Garland Drain Rainwater harvesting
For protection while
loading and transporting the mineral ramp will be constructed.
2.20 2.20
7
Govt. Sr. Sec. School at village Ganeshpura
Repair of School Building & Room Construction
Solar Power Plant 2KW
Furniture (Tables &
Chairs) & Computers
3.50 3.50
8 Sub health centre, Bhawanipura
Medicine and Medical
equipments
Sanitary Pads 2.50 2.50
9
Village Devlopment, Bhawanipura& Sutra
Cleanliness
Drinking water
Public toilets 2.00 2.00
Total 24.3 24.3
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for approval of EIA/EMP and EC for Bhawanipura
Sandstone & Khanda Mining Project, Ref. No. 201810000631, Area- 2.4353 ha., Production
Capacity- 4,84,415 TPA (ROM) at Khasra no 192, Vill.- Bhawanipura, Tehsil- Talera, Distt.-
Bundi, State- Rajasthan (Proposal No- 61787). The SME, Kota vide order dated 01.10.2018
has issued LoI to the PP having validity of a period of 18 months. The valditiy of LOI has
been extended by SME, Kota vide letter dated 19.07.2021. The LOI is now valid up to
30.09.2021. The mining plan has been approved by the SME, Kota vide letter dated
01.11.2018. ME, Bundi II in his certificate dated 23.07.2019 has stated that the mining lease
does not fall in Aravalli hills. Range Officer, Ramgarh WLS, in his letter dated 08.06.2021
addressed to DCF, WL, Kota has stated that Ramgarh WLS is at a distance of 39.36 Km from
WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt & Plantation
Total green belt will be the 33% of the mine area 8.955 ha of the area shall be carried out near lease area and trees shall be planted both side of the road connected to mine, Statutory Barrier & Part of own khatedari land at village Bhawanipura & Sutra in 192,138,140, 209, 446/182, 169, 236, 164, 197 & with join venture association Native species which are more suitable to the local environment are
preferred to be planted such as like Neem (Azadiracta indica), Pipal (Ficus religiosa), Mango (Mangifera Indica), Amla (Phyllanthus Emblica) etc. it is the proposed to invest 2 Lac. Rs. Per annum for greenbelt development.
Year
Along the lease boundary &
Outside the lease area Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.)
No. of
Trees
1st Year 2.985 2985 -- -- 2.985 2985
2nd Year 2.985 2985 -- -- 2.985 2985
3rd Year 2.985 2985 -- -- 2.985 2985
Total 8.955Hect. 8955 -- -- 8.955Hect. 8955
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
13. Budgetary breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr. No. Facility provided for Labour Capital Cost in
Rs. Recurring cost in Rs.
1. Drinking water facility 2,00,000/- 2,00,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
3,00,000/- 3,00,000/-
3. Education for Labour children 70,000/- 70,000/-
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc.
90,000/- 90,000/-
Total 6,60,000 6,60,000
14. Present Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
the applied lease area. DCF, MNP, Kota in his certificate dated 22.07.2021 has stated that the
MHTR is at a distance of 4.29 Km from the applied lease area.
The SEAC also went through para 4 (i)/ (ii)/ (iii) and (iv) of the OM dated
08.08.2019 of the MoEF & CC which requires that the Expert Appraisal Committee would
examine the proposal from environmental angle including impact of developmental activity/
project on the Wildlife and its habitat, if any, and recommend appropriate protection and
conservation measures and that these recommendations shall be explicitly mentioned in the
EC letter. Since the project falls within a distance of 10 Km from the boundary of National
Park/ Wildlife Sanctuary and outside notified ESZ, the following specific conditions shall
also be applicable in terms of OM dated 08.08.2019 of the MoEF & CC:
1. The mining activity should be carried out in a manner so that the water
regime/system of the sanctuary is not disturbed. The mining activity should not
adversely affect any existing water course, water body, catchment etc. The PP
shall while carrying out mining activity ensure compliance of the provisions of
Air (Prevention and Control of Pollution) Act 1981, Water (Prevention and
Control of Pollution) Act 1974 and the Environment (Protection) Act, 1986 so that
the wildlife in the area is not adversely affected.
2. The processes like blasting, drilling, excavation, transport and haulage resulting
into noise, should be carried out in such an manner so that such activities do not
disturb wild animals and birds particularly during sunset to sunrise. The level of
noise should be kept within the permissible limits.
3. The mining activity should not create any obstacle in the way of free movement of
wildlife and adversely affect wildlife corridors.
4. The mineral waste/ slurry should be dumped only at the designated places only
and such waste dumps should be reclaimed in accordance with the conditions of
the mining plan/ consent issued by the RSPCB under the Water and Air act.
5. The PP shall cooperate with the concerned DCF, Wildlife in their efforts towards
protection and conservation of wildlife in the Sanctuary/ Park.
6. The PP shall ensure that the transporter and labor employed by him should not
damage flora and fauna in the ESZ and the Wildlife Sanctuary/ National Park.
The PP during presentation informed that he has submitted Wildlife conservation plan
to the respective DCF, on 27.07.2021 in terms of guidelines dated 24.05.2019 issued by the
Chief Wildlife Warden, Rajasthan, Jaipur.
The particulars of project of Sh. Nanda Karad, are as follows:
S.
No
.
Particula
rs
Details/Information
1. Cat./ Item
no. (in
schedule):
1 (a)-B1
2. Location
of the
Project
Near village – Bhawanipura, Tehsil: Talera, District: Bundi (Rajasthan)
3. Project
Details
M.L No./
Productio
n Capacity
Ref. No. : 201810000631
Khasra No. : 192
Area : 2.4353HECT.
Production (TPA) : 484415 TPA(ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Project Project Cost: Rs 0.80 Cr./-(in Rs.)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Cost Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water
requireme
nt &
Source
Total water requirement is about 5.0 KLD= 2.0 KLD (Drinking & Domestic Uses) + 1.5
KLD (Plantation) + 1.5 KLD (Dust Suppression), Water for Drinking, dust suppression and
plantation will be collected from nearby villages.
6. Fuel &
Energy
Diesel will be used for transportation vehicles.
7. Application no.,
Date of
Documen
ts
Submitted
Category : B1 SEAC FILE NO. : 15883
Date of documents Submitted : 16/03/2021
SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 21
Date of Presentation : 28/07/2021
8. Informati
on about
Aravalli
certificate
Aravalli Certificate has been issued by Mining Engineer, Bhilwara vide letter No.
ME/Bundi/Map/2019/58 dated 23/07/2019.
9. Date of
Air,
Water,
Noise, monitorin
g
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida.
10. Informatio
n about
500 mts
composite
map
500 mts composite map has been issued by Assistant Mining Engineer, Bhilwara vide letter
No. ME/Bundi/Map/2019/58 dated 23/07/2019.
Area falling within 500 mts 27.1351ha.
11. EMP
Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 5.60 lacs Recurring Cost:
Rs. 5.60 lacs per annum.
Sl. No Description Measures
Capital
Cost
(Rs. In
lakhs)
Recurring Cost
(in
lakhs/annum)
1 Air Pollution Control
Road Preparation & Maintenance
Water Sprinkling Planting plant
species which can control air pollution along the approach road.
1.60
0.20 0.20
1.60
0.20 0.20
2
Water Pollution Control
Septic tanks for workers
0.30 0.30
3 Green Belt Development
Barrier zone Near lease area 0.50 0.50
4 Water Tanks for cattles
Tanks will be made for animal water drinking
0.20 0.20
5 Occupational health
Medical facilities including periodic health checkups and first aid facility for labors.
0.40 0.40
6
Ramps Garland Drain Rainwater
For protection while loading and transporting the mineral ramp will be
1.00 1.00
Final minutes of 4.95th meeting held on 27-29 July, 2021
harvesting constructed.
7
Govt. Sr. Sec. School at village Ganeshpura
Repair of School Building
Furniture (Tables & Chairs)
0.80 0.80
8
Sub health centre, Bhawanipura
Medicine and Medical equipments
Sanitary Pads
0.30 0.30
9.
Village Devlopment, Bhawanipura
Cleanliness
Drinking water
Public toilets
0.10 0.10
Total 5.60 5.60
Protection & Conservation of Local Flora & Fauna other than EMP Funds- 12,93,000/- Mining leases and WCP - 1. Shri Nanda Karad 2. Shri Nana Lal Dhakar 3. Shri Devi Singh whose area is 5.8487 ha. will be responsible for execution of WCP. Remaining other lessees have already got EC and they will be executing their plan as per EC conditions.
12. Greenbelt
&
Plantation
Expenditure of Green Belt Rs 50,000/-
Total green belt will be the 33% of the mine area 0.801 ha shall be planted in the
Remaining Part of Own khatedari land ai village Bhawanipura in Khasra No 192 & with
association.
Native specie which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica), Peepal (Ficus religiosa), Mango (Mangifera indica
), Shisham ( Dalbergia sissoo ) etc.
Year
Outside the lease area( Part of Own khatedari
land ai village Sutra in
Khasra No 209 & with
association)
Top Soil Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st Year 0.267 267 -- -- 0.267 267
2nd
Year 0.267
267 -- -- 0.267
267
3rd Year 0.267 267 -- -- 0.267 267
Total 0.801
Hect.
801 -- -- 0.801
Hect.
801
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which may
have been disturbed due to their mining activities and restore the land to a condition
which is fit for growth of fodder, flora, fauna etc.
13. Budgetary breakup
for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr.
No.
Facility provided for Labour Capital Cost in
Rs.
Recurring cost in
Rs.
1. Drinking water facility 20,000/- 20,000/-
2. Health Facility (First aid box, Rest
shelter, Medicine & Washroom) &
Insurance
30,000/- 30,000/-
3. Education for Labour children 20,000/- 20,000/-
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc.
10,000/- 10,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Resolution
The SEAC, upon appraisal of the project and having regard to the information contained in
Form-1, Form-2, final EIA/ EMP reports and other documents, submitted by the PP and
presentation made by the PP/ Consultant, resolved to recommend to SEIAA for (1.) Approval
of EIA/ EMP with respect to Bhawanipura & Sutra Sandstone & Khanda Cluster No. 1 as
mentioned by SME, Kota in certificate dated 08.07.2021, having Cluster area of 27.1351 ha.,
and comprising 8 mining leases, with consolidated carrying capacity of 11,75,891.58 TPA.
(2.) Grant of EC to Shri Nanda Karad, Co-applicant 1. Sh. Prabhu, 2. Smt. Aijan Bai, 3. Smt.
Sosar Bai, 4. Smt. Motiya Bai, for Bhawanipura Sandstone & Khanda Mining Project, Ref.
No. 201810000631, Area- 2.4353 ha., Production Capacity- 4,84,415 TPA (ROM) at Khasra
no. 192, Vill.- Bhawanipura, Tehsil- Talera, Distt.- Bundi, State- Rajasthan (Proposal No-
61787), covered under the above mentioned cluster comprising total lease area of 27.1351
ha., with the stipulation that the PP shall abide by the annual production scheduled specified
in mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. The PP shall also abide by the special conditions as mentioned in
OM dated 08.08.2019 and as noted in the above mentioned observations.
Besides the general conditions mentioned in Annexure “A” the SEAC also resolved to
recommend to SEIAA to impose following additional condition:
The PP/all lessees in the cluster shall abide by the mitigation and restoration measures
provided in the final Environment Impact Assessment and Environment Management plan
prepared for the cluster as a whole for Bhawanipura & Sutra Sandstone & Khanda Cluster
No. 1, Total Cluster Area- 27.1351 ha., total no. of mining leases 8, Cluster Production
Capacity- 11,75,891.58 TPA, cluster project cost 4.35 Crores.
Agenda no. 22. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B1(16819)/ 2019-20
Project Name- Application for approval of EIA/ EMP with respect to Fakoliya Granite mine
Cluster, Cluster area 23.1322 ha, comprising 9 mining leases, with consolidated carrying
capacity of 8,91,669 TPA and EC to Shri Ankit Kumar Surya for Fakoliya Granite Mining
Project, M.L. No. 23/2007, Area- 2.2447 ha, Production Capacity– 3,19,742 TPA (ROM) at
Khasra No.– 1523/1362, 1524/1362, at village- Fakoliya, Tehsil- Karera, Dist- Bhilwara,
State-(Raj.), (Proposal No-61868).
Project Proponent Name: Shri Ankit Kumar Surya, Add- Shanti Vila, Vidhya
Niketan, Tehsil- Amet, Dist- Rajsamand, (H.R.), Email- [email protected].
Consultant Name- Cognizance Research India Pvt. Ltd. Add.- GT -20, Sec - 117, Noida
(U.P.) Email. [email protected].
Observations of the committee:-
The SEAC considered Final EIA/EMP report for approval of EIA/ EMP with respect
to Fakoliya Granite mine Cluster, Cluster area 23.1322 ha, comprising 9 mining leases, with
Total 80,000/- 80,000/-
14. Present
Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
consolidated carrying capacity of 8,91,669 TPA and EC to Shri Ankit Kumar Surya for
Fakoliya Granite Mining Project, M.L. No. 23/2007, Area- 2.2447 ha, Production Capacity–
3,19,742 TPA (ROM) at Khasra No.– 1523/1362, 1524/1362, at village- Fakoliya, Tehsil-
Karera, Dist- Bhilwara, State-(Raj.), (Proposal No-61868), in its 4.95th meeting held on
28.07.2021 through VC/ electronic media in accordance with letter dated 27.05.2020 of
SEIAA, Rajasthan.
The project was also considered earlier in terms of OM dated 12.12.2018 of the MoEF
& CC by SEAC in its 4.43th meeting held on 15th July., 2020 prescribing ToR for undertaking
EIA studies and for preparing EMP as the size of the cluster in which the proposed project
lies exceeded 5.0 ha.
One season post monsoon primary base line data of the ambient air quality PM2.5,
PM10, SO2 and NOX, Water Quality, Noise level, Soil quality and Flora and Fauna were
collected during Dec., 2019 to Feb., 2020.
The PP following the above decision got public notice published in 05.01.2021
edition of Dainik Bhaskar, Bhilwara and 05.01.2021 edition of Dainik Navjyoti, Bhilwara
and for holding public hearing for the entire cluster for ascertaining material concerns for
local affected persons and it such concerns into account in the EIA/EMP report.
Public hearing was accordingly held on 05.02.2021 at 1.00 PM at Rajiv Seva Kendra
Gram Panchayat Chitambha, Tehsil –Kareda and District Bhilwara, for the entire cluster and
with reference to application for EC for mining activity by Fakoliya Granite Mining Project,
M.L. No. 23/2007, (cluster area- 23.1322 ha), Area- 2.2447 ha, Production Capacity –
3,19,742 TPA (ROM) at Khasra No. – 1523/1362, 1524/1362, at village- Fakoliya, Tehsil-
Karera, Dist- Bhilwara, State-(Raj.), under the Chairmanship of Sh. Rakesh Kumar, Add.
District Collector, Bundi and Sh. Mahaveer Mehta, Regional officer, RSPCB, Bhilwara was
also present during public hearing.
The details of issue raised by the public and commitments made by the PP during
public hearing and the action plan for implementation thereof are as follows:-
S.
No.
Name of Person with address
Queries /Suggestions Replies Time bound Plan of Action
With Financial Allocation
for cluster
1 Memorandum submitted by all
the village Fakoliya, Majara
and Padampura, Gram
Panchayat Simiti Chitamba
Tehsil Kareda Dist. Bhilwara
during public hearing
(Memorandum copy enclosed
as annexure B)
A complaint filed by villagers
against the mining lease
allotted by mines department
in village Fakoliya, Majara
and Padampura, Gram
Panchayat Simiti Chitamba
Tehsil Kareda Dist. Bhilwara
around the Khari river and
the populate area of the
village. court case reference
(Om Singh Chundwat / Govt.
of Rajasthan OA no
71/2020) Honable national
Green Tribunal (NGT, Central
Zone) in Bhopal for the
cancelation mining leases.
Currently case is pending, so
department not allot new
The District collector Bhilwara
convinced the villagers that the
memorandum submitted by you
will be presented at the competent
level along with the working
details of this public hearing.
A court case (Om Singh
Chundwat / Govt. of
Rajasthan OA no 71/2020)
Honable national Green
Tribunal (NGT, Central Zone)
in Bhopal is filed. Lease case
is pending.
1. The lease area ML No.
23/07 is situated 1.46 km
form khari river and there will
be no discharge from the lease
so there will be no impact of
the water of the Khari river.
2. The Lease will not use
41/02 khasra for road.
Final minutes of 4.95th meeting held on 27-29 July, 2021
leases.
2 Kanhaiya lal During the public hearing,
the forest of Duvala has been
described as 3 kilometer by
the consultant, while the
mining units have been
approved at a distance of
only 200 meters from the
boundary of Padampura and
Forest Department and
mining units have been
sanctioned only 20 meters
from the Khari river.
This mining lease was located in
own khatedari land khasra no
1523/1362 and 1524/1362.
The Joint demarcation of this
mining lease has been done with
the Forest Department living 25m
from Un Settled Forest.
Also, ADM told to the villagers that
your suggestions have been filed.
you suggestions will be presented
at the competent level along with
the working details of this public
hearing.
The mining lease was granted
in year 2007 in own khatedari
land. so raised point is not
applicable.
The lessee will be make 6.0 m
height retaining wall around
the mining lease.
3 Prahalad It is requested that do not
grant any mining lease in
this area, when case is
pending at NGT level,
otherwise the life of the
people here will be ruined.
Water will be finished out.
Livestock will deteriorate due
to mines allotted by Mining
Department near the Khari
river.
4 Chandan singh It is requested that, During
the mining operation what
measures should be taken
for the control of dust
suppuration.
Environments consultant Sh.
Nimish Singhvi told that During
the mining operation continuous
sprinkling of water will be done to
stop the dust suppuration.
After commencement of
mining operation
Financial Allocation-1,50,000
Rs for water spraying.
The PP following issue of ToR, has submitted application for obtaining EC along with
the final EIA/ EMP report and the proceedings of public hearing on 16.03.2021.
The Fakoliya Granite Cluster formed by AME, Bhilwara in terms of Notification
dated 15.01.2016 and 01.07.2016 of the MoEF & CC and as defined in the map and the
certificate dated 10.03.2021 has LOI and Leases (09) with total lease area of 23.1322 ha., and
production capacity of Cluster- 8,91,669 TPA.
The particulars of individual mining/ leases including their budget for EMP/
Labour welfare, which area part of cluster are as follows:
Sr
.
N
o.
Name
of
Holder
of
LOI/Q
L/ML
2) Particulars of
LOI/QL/
ML No.
Date
of
Sancti
on
Name
of
Minera
l
Area
(in Ha)
Khasr
a No.
Product
ion
Capacit
y
Project
Cost
(in Cr.)
Weather EC
obtained if
yes, Name of
Authority
and Date
Budget
for EMP
(Recurri
ng) (in
Rs)
Budget
for
Green
Belt
Develo
pment
(in Rs)
Budget
for
Labour
Welfare
(in Rs)
1.
Shri Ankit
Kumar Surya
(M.L. No.
–
23/2007)
14/03/
2008 Granite 2.2447
1523/
1362,
1524/
1362
319742
TPA
(ROM)
1.10 Now applied 7,70,000 50,000 1,00,000
2
M/s
Yashdee
p
Granite
M.L.No.2
6/2014
22/08/
2017 Granite 3.00
1525/
1362,
1507/
1362,
1501/
49513
TPA
0.55
F1(4)/SEIAA/SEAC-
Raj/Sectt/Proj
ect/ Cat.1 (a)B2(EC)14-
15 Jaipur dated
17.05.2016
1.63,900 30,000 45,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
407,
1563/
407
3
M/s A.
S.
Granites
M.L.No.2
7/2014
17/08/
2017 Granite 3.00
1539/
1362,1
509/1
362,
1515/
1362,
1505/
1362
117000
TPA
0.70
F1(4)/SEIAA/SEAC-
Raj/Sectt/Proj
ect/Cat. 1(a)B2/(3273)14-15 Jaipur
dated 17.12.2015
1,75,000 30,000 60,000
4.
M/s
Kaustub
h
Granites
M.L.No.2
8/2014
11/01/
2017 Granite 3.00
1516/
407,
1576/
407,
755/1
15,
757/1
15
50884
TPA 0.55
F1(4)/SEIAA/S
EAC-
Raj/Sectt/Proj
ect/Cat.1(a)B2
(EC)14-15
Jaipur dated
30.03.2016
1.63,900 30,000 45,000
5
M/s
Marudha
ra
Granites
M.L.No.2
9/2014
19/07/
2017 Granite 3.00
1511/
1362,
1510/
407,
1535/
407,
1526/
407
50249
TPA 0.55
F1(4)/SEIAA/S
EAC-
Raj/Sectt/Proj
ect/ Cat.1
(A)B2(EC)14-
15 jaipur
dated
30.03.2016
1.63,900 30,000 45,000
6
M/s
Mallinat
h
Granites
M.L.No.3
0/2014
19/07/
2017 Granite 1.8809
1516/
407,
1536/
407,
1526/
407,
1503/
407,
1504/
407,
1535/
407
106934
TPA 0.90
F1(4)/SEIAA/S
EAC-
Raj/Sectt/Proj
ect/ Cat.1
(A)B2(2426)1
4-15 jaipur
dated
10.05.2016
1,55,000 25,000 65,000
7 Shree
Stones
M.L.No.3
1/2014
17/01/
2017 Granite 3.00
113,
758/1
14,
786/9
7,
780/9
7
72495TP
A 0.75
F1(4)/SEIAA/S
EAC-
Raj/Sectt/Proj
ect/Cat.1
(a)B2 (EC)14-
15 Jaipur
dated
30.03.2016
1,80,000 25,000 60,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
8
M/s
Crosslan
d
Granite
Pvt.
Ltd.
M.L.No.3
2/2014
17/08/
2017 Granite 3.00
1505/
1362,1
537/1
362,
1519/
1362,
1538/
1362,1
558/1
511
97000TP
A 0.60
F1(4)/SEIAA/S
EAC-
Raj/Sectt/Proj
ect/Cat.
1(a)B2/(2974)
14-15 Jaipur
dated
17.12.2015
1,60,000 20,000 40,000
9
M/s
Omkar
Granites
Pvt.
Ltd.
M.L. No.
40/2014
14/01/
2017 Granite 1.0066
106,
106/2,
106/5,
713/9
8, 101,
99,
714/9
8, 100,
102,
98/2,
98/3,
98/4,
98/5,
98/6,
105/1,
105/2,
105/3,
105/4,
105/5
27852
TPA 0.50
F1(4)/SEIAA/
SEAC-
Raj/Sectt/Proj
ect/ Cat.1
(a)B2(EC)14-
15 Jaipur
dated
30.03.2016
1,42,500 10,000 40,000
The SME, Bhilwara vide letter dated 23.07.2021 has approved mining plan for mining
of Granite with respect to the said cluster. According to the information submitted by the PP,
mining leases covered under the cluster do not fall in Aravalli hills and that there is no
National Park/ Wildlife Sanctuary within the periphery of 10 Km from the mining leases in
the cluster. The PP has given an undertaking that cluster EMP shall be implemented by the
LOIs/ mining lease holders collectively in consultation and supervision of the concerned
Mining Engineer.
The particulars of the project, in brief, as submitted by the PP for cluster are as
follows:
1. Category/ Item no. (in Schedule):
1 (a) /Category-B1
2. Location of Project
Near Village- Fakoliya, Tehsil Kareda, District Bhilwara, Rajasthan
3. Project Details REF. No./Production capacity
Sr.
No.
Name of Project
Proponent with
Location and M.L No.
M.L
Area
in ha
Lease
Status
EC Granted Proposed
/Existing
Production
(TPA)
Final minutes of 4.95th meeting held on 27-29 July, 2021
1. Shri Ankit Kumar
Surya
Near Village-
Fakoliya, Tehsil
Kareda, District
Bhilwara
(M.L No. 23/2007)
2.2447
Existing
Lease First
Time
Applied for
EC
--- Granite
319742TPA
2. M/s Yashdeep Granite
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.26/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(a)B2(EC)14-15 Jaipur
dated 17/05/2016
Granite
49513TPA
3. M/s A. S. Granites
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No. 27/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.
1(a)B2/(3273)14-15 Jaipur
dated 17/12/2015
Granite
117000 TPA
4. M/s Kaustubh Granites
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.28/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.1(a)B2
(EC)14-15 Jaipur dated
30/03/2016
Granite
50884 TPA
5. M/s Marudhara
Granites
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.29/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(A)B2(EC)14-15 jaipur
dated 30/03/2016
Granite
50249 TPA
6. M/s Mallinath Granites
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.30/2014
1.8809 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(A)B2(2426)14-15 jaipur
dated 10/05/2016
Granite
106934 TPA
7. Shree Stones
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.31/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.1
(a)B2 (EC)14-15 Jaipur
dated 30/03/2016
Granite
72495 TPA
8. M/s Crossland Granite
Pvt. Ltd.
Near Village- Fakoliya,
Tehsil Kareda, District
Bhilwara
M.L.No.32/2014
3.00 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.
1(a)B2/(2974)14-15 Jaipur
dated 17/12/2015
Granite
97000 TPA
Final minutes of 4.95th meeting held on 27-29 July, 2021
9. M/s Omkar Granites
Pvt. Ltd.
Near Village-
Baghjana, Tehsil
Kareda, District
Bhilwara
M.L. No. 40/2014
1.0066 Operational
Lease
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(a)B2(EC)14-15 Jaipur
dated 30/03/2016
Granite
27852 TPA
Total 23.1322
891669 TPA
Carrying Capacity of the cluster: 891669 TPA
4. Project Cost Sr. No. Name of Project Proponent LOI/QL/
ML No. Project Cost (in Cr.)
1. Shri Ankit Kumar Surya 23/2007
1.10
2 M/s Yashdeep Granite 26/2014
0.55
3 M/s A. S. Granites 27/2014
0.70
4 M/s Kaustubh Granites 28/2014
0.55
5 M/s Marudhara Granites 29/2014
0.55
6 M/s Mallinath Granites 30/2014
0.90
7 Shree Stones 31/2014
0.75
8 M/s Crossland Granite Pvt. Ltd. 32/2014
0.60
9 M/s Omkar Granites Pvt. Ltd. 40/2014 0.50
5. Water Requiremen
t & Source
Sr
.
N
o.
Water
Consum
ption
Shri
Anki
t
Ku
mar
Sury
a
M/s
Yashd
eep
Grani
te
R
M/s
A. S.
Gran
ites
M/s
Kaust
ubh
Granit
es
M/s
Marud
hara
Granite
s
M/s
Mallin
ath
Granit
es
Shr
ee
Sto
nes
M/s
Crossl
and
Granit
e Pvt.
Ltd.
M/s
Omk
ar
Gran
ites
Pvt.
Ltd.
Quantity (m3day)
Total Water
Requirement
4.00
KL
D
3.20
KLD
10.0
KLD
3.20
KLD
3.20
KLD
4.00
KLD
5.00
KL
D
10.00
KLD
3.20
KLD
Source: Water requirement of the projects falling in the cluster taken from issued EC Letter from
SEIAA-Raj/DEIAA-Bhilwara
Source: Water will be made available by nearby village Fakoliya through water tanker.
6. Fuel &Energy: -
Diesel operated machinery will be used. Fuel will be required for the operation of mines machineries and transportation vehicles which will be taken care by the contractor itself. 15 KVA of DG set also proposed. Electricity connection will be taken from the concerned electricity department. For mining leases already operational electricity connection has already been taken.
7. Application No. & Date & documents submitted: -
Online Proposal No. (SIA/RJ/MIN/61868/2019) Hard copy submission date- 16/03/2021 Documents: Cluster EIA/EMP Report along with approved mining plan & all the requisite documents for grant of EC have been submitted.
8. Information about
Aravali Certificate was issued by ME, Bhilwara, vide letter no ME/Bhil/CC 2/M.L. No23/2007/1807 on
Final minutes of 4.95th meeting held on 27-29 July, 2021
Aravalli Certificate.
dated 10/09/2018.
9. Date of Air/Water/
Noise Monitoring
Baseline period for Air/Water/Noise Monitoring was Post-Monsoon Season (Dec-2019 – Feb 2020)
10. Information about Cluster & 500 mts composite
map& Cluster Certificate
500 mts Composite map has been issued by AME, Bhilwara vide letter No- 195 on dated 10/03/201.
Cluster certificate has been issued by AME, Bhilwara vide letter No- ME/Bhil/Map/Cluster/M.L. No.
23/2007/196 on dated 10/03/201.
11. . Environment Management Plan
Sr
.
N
o.
Name
of
Project
Propo
nent
LOI/
QL/
ML
No.
Proj
ect
Cost
(in
Cr.)
Details of EC
Granted
Budget for
EMP
(in Lakh)
Budget
for
Green
Belt
Develop
ment (in
Lakh
per
annum)
Budget for
Labour
Welfare
(in Lakh)
Capi
tal
Recurr
ing per
annum
Capi
tal
Recurr
ing per
annum
1. Shri
Ankit
Kumar
Surya
23/20
07 1.10
Now applied 7.70 7.70 0.50 1.00 1.00
2 M/s
Yashdee
p
Granite
26/20
14 0.55
F1(4)/SEIAA/SEA
C-Raj/Sectt/Project/
Cat.1 (a)B2(EC)14-
15 Jaipur dated
17/05/2016
1.639 1.639 0.30 0.45 0.45
3
M/s A.
S.
Granites
27/20
14 0.70
F1(4)/SEIAA/SEA
C-
Raj/Sectt/Project/Ca
t. 1(a)B2/(3273)14-
15 Jaipur dated
17/12/2015
1.75 1.75 0.30 0.60 0.60
4
M/s
Kaustub
h
Granites
28/20
14 0.55
F1(4)/SEIAA/SEA
C-
Raj/Sectt/Project/Ca
t.1(a)B2 (EC)14-15
Jaipur dated
30/03/2016
1.639 1.639 0.30 0.45 0.45
5 M/s
Marudha
ra
Granites
29/20
14 0.55
F1(4)/SEIAA/SEA
C-Raj/Sectt/Project/
Cat.1
(A)B2(EC)14-15
jaipur dated
30/03/2016
1.639 1.639 0.30 0.45 0.45
6 M/s
Mallinat
h
Granites
30/20
14 0.90
F1(4)/SEIAA/SEA
C-Raj/Sectt/Project/
Cat.1
(A)B2(2426)14-15
jaipur dated
10/05/2016
1.55 1.55 0.25 0.65 0.65
7
Shree
Stones
31/20
14 0.75
F1(4)/SEIAA/SEA
C-
Raj/Sectt/Project/Ca
t.1 (a)B2 (EC)14-15
Jaipur dated
30/03/2016
1.80 1.80 0.25 0.60 0.60
8 M/s
Crosslan
d
Granite
Pvt. Ltd.
32/20
14 0.60
F1(4)/SEIAA/SEA
C-
Raj/Sectt/Project/Ca
t. 1(a)B2/(2974)14-
15 Jaipur dated
17/12/2015
1.60 1.60 0.20 0.40 0.40
9 M/s
Omkar
Granites
40/20
14 0.50
F1(4)/SEIAA/SEA
C-Raj/Sectt/Project/
Cat.1 (a)B2(EC)14-
1.425 1.425 0.10 0.40 0.40
Final minutes of 4.95th meeting held on 27-29 July, 2021
Pvt. Ltd. 15 Jaipur dated
30/03/2016
TOTAL 20.742 20.742 2.5 5.0 5.0
Source: EMP cost of the projects falling in the cluster taken from issued EC Letter from SEIAA-Raj/DEIAA-
Ajmer
Sl. No Description Measures Capital Cost (Rs. In lakhs)
Recurring Cost (in
lakhs/annum)
1 Air Pollution
Control
Water Sprinkling
Planting plant species which can control air pollution along the approach road.
2.0 1.0
2.0 1.0
2 Water Pollution Control
Septic tanks for workers 1.0 1.0
3 Green Belt Development
Barrier zone
Near lease area
Approach Road 2.5 2.5
4 Occupational health
Medical facilities including
periodic health checkups and first aid facility for labors.
2.5 2.5
5
Ramps Garland Drain Rainwater
harvesting
For protection while loading and transporting the mineral ramp will be constructed. 2.0 2.0
6 Road • Preparation &
Maintenance of Road 9.742 9.742
Total 20.742 20.742
Protection & Conservation of Schedule-I Fauna other than EMP Funds- 6,12,238/-.
This cluster EMP will be additional to the EMP proposed in the individual EC letters granted by
SEIAA-Raj/DEIAA-Bhilwara to the existing mine lease holders falling in this cluster and the
cluster EMP shall be implemented by the LOI’s/mining lease holders collectively in consultation
and supervision of the concerned Mining Engineer as also stated in the submitted undertaking.
12. . Green Belt/ Plantation
Year
Along the lease boundary &
Outside the lease area Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.)
No. of
Trees
1st Year 0.247 247 -- -- 0.247 247
2nd Year 0.247 247 -- -- 0.247 247
3rd Year 0.247 247 -- -- 0.247 247
Total 0.741 Hect. 741 -- -- 0.741
Hect.
741
Total green belt will be the 33% of the mine area 0.741 ha of the area shall be carried out near lease
area and trees shall be planted both side of the road connected to mine, Statutory Barrier & Part of
own khatedari land at village Fakoliya in 1523/1362,1524/1362 Native species which are more
suitable to the local environment are preferred to be planted such as like Neem (Azadiracta indica),
Pipal (Ficus religiosa), Mango (Mangifera Indica), Amla (Phyllanthus Emblica) etc. it is the
proposed to invest 2 Lac. Rs. Per annum for greenbelt development.
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
Final minutes of 4.95th meeting held on 27-29 July, 2021
13. Budgetary Breakup for Labour
Sr.
No.
Name of
Project
Proponent
LOI/QL/
ML No.
Project
Cost
(in
Cr.)
Details of EC Granted Budget for Labour
Welfare
(in Lakh)
Capital Recurring
per
annum
1.
Shri Ankit
Kumar
Surya
23/2007 1.10 Now applied
1.00 1.00
2
M/s
Yashdeep
Granite
26/2014 0.55
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(a)B2(EC)14-15 Jaipur dated
17/05/2016
0.45 0.45
3 M/s A. S.
Granites 27/2014 0.70
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.
1(a)B2/(3273)14-15 Jaipur
dated 17/12/2015
0.60 0.60
4
M/s
Kaustubh
Granites
28/2014 0.55
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.1(a)B2
(EC)14-15 Jaipur dated
30/03/2016
0.45 0.45
5
M/s
Marudhara
Granites
29/2014 0.55
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(A)B2(EC)14-15 jaipur dated
30/03/2016
0.45 0.45
6
M/s
Mallinath
Granites
30/2014 0.90
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(A)B2(2426)14-15 jaipur dated
10/05/2016
0.65 0.65
7 Shree
Stones 31/2014 0.75
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.1 (a)B2
(EC)14-15 Jaipur dated
30/03/2016
0.60 0.60
8
M/s
Crossland
Granite Pvt.
Ltd.
32/2014 0.60
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/Cat.
1(a)B2/(2974)14-15 Jaipur
dated 17/12/2015
0.40 0.40
9
M/s Omkar
Granites
Pvt. Ltd.
40/2014 0.50
F1(4)/SEIAA/SEAC-
Raj/Sectt/Project/ Cat.1
(a)B2(EC)14-15 Jaipur dated
30/03/2016
0.40 0.40
TOTAL 5.0 5.0
14. Present Status
Sh. Ankit Kumar Surya is a Existing lease now proposed for the grant of Environmental Clearance and rest other mines in the cluster are already having EC as mentioned above at point no. 11 Column No. 4.
This is an existing lease. The mining lease for an area of 3.00 ha was granted in
favour of Shri Ankit Kumar Surya S/O Shri Sushil Kumar Surya vide order dated 02.01.2008.
The lease deed was executed on dated 14.03.2008 and was registered on 08.04.2008 for 20
years (08.04.2008 to 07.04.2028) a part of lease area fell in forest land so the lessee applied
to the Govt. of Rajasthan for partial surrender of 0.7553 ha of the lease area. The partial
surrender i.e. 0.7553 ha., was accepted vide order dated 31.08.2018. The modification in the
mining plan with progressive mine closure plan was approved by SME, Bhilwara vide order
dated 04.03.2019. The retained area therefore, is 2.2447 ha.
The project being one of minor mineral having lease area of 2.2447 ha., came under
the purview of the EIA Notification dated 09.09.2013 of the MoEF & CC. According to the
certificate dated 13.07.2020 of ME, Bhilwara, production of mineral in the year 2012-13 i.e.
base year was 2570 Ton and thereafter, up to 2019-20, production of mineral has either been
nil or less than the base years production level. The project, therefore, is not one of violation
of the EIA Notification. The PP has also submitted affidavit to the affect that no activity has
been carried out in violation of the EIA Notification and Common Cause Judgment
pronounced by the Hon’ble Supreme Court.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for approval of EIA/EMP and EC with respect to
Fakoliya Granite Mining Project, M.L. No. 23/2007, Area- 2.2447 ha, Production Capacity–
3,19,742 TPA (ROM) at Khasra No.– 1523/1362, 1524/1362, at village- Fakoliya, Tehsil-
Karera, Dist- Bhilwara, State-(Raj.), (Proposal No-61868). ME, Bhilwara in his certificate
dated 10.09.2018 has stated that the mining lease does not fall in Aravalli hills. DCF,
Bhilwara in his certificate dated 04.07.2019 has stated that there is no Wildlife
Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine. The
DCF, Bhilwara in his certificate dated 24.08.2018 has stated that the applied lease area is 25
meters away from the Forest land and has directed that mining activity should start only after
construction of Pucca wall on 3 sides of the Forest land and that no forest land will be used
for transportation.
The PP during presentation informed that he has submitted Wildlife conservation plan
to the respective DCF, on 27.07.2021 in terms of guidelines dated 24.05.2019 issued by the
Chief Wildlife Warden, Rajasthan, Jaipur.
The particulars of project of Sh. Ankit Kumar Surya, are as follows:
1. Category/
Item no. (in Schedule):
1 (a) /Category-B1
2. Location of
Project Near Village- Fakoliya, Tehsil Kareda, District Bhilwara, Rajasthan
3. Project Details
REF. No./Production
capacity
(M.L. No. – 23/2007), M.L. Area: 2.2447Ha. Khasra No. 1523/1362,1524/1362 Production–3,19,742TPA (R.O.M.)
(Granite : 114002TPA, Waste: 205740TPA)
4. Project Cost Rs. 1.10 Cr.
5. Water
Requirement
& Source
Total water requirement is about 4.0 KLD= 1.0 KLD (Drinking & Domestic Uses) + 1.0 KLD
(Plantation) + 0.5 KLD (Dust Suppression), 1.5 KLD (Wire saw cutting & Wet drilling). Water for
Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel &Energy: - Diesel operated machinery will be used. Fuel will be required for the operation of mines
machineries and transportation vehicles which will be taken care by the contractor itself. 15 KVA
of DG set also proposed.
Electricity connection will be taken from the concerned electricity department.
7. Application No.
& Date &
documents submitted: -
Online Proposal No. (SIA/RJ/MIN/61868/2019) Hard copy submission date- 16/03/2021 Documents: Cluster EIA/EMP Report along with approved mining plan & all the requisite
documents for grant of EC have been submitted.
8. Information
about Aravalli
Certificate.
Aravali Certificate was issued by ME, Bhilwara, vide letter no ME/Bhil/CC 2/M.L.
No23/2007/1807 on dated 10/09/2018
9. Date of
Air/Water/Noise Monitoring
Baseline period for Air/Water/Noise Monitoring was Post-Monsoon Season (Dec-2019 – Feb
2020)
10. Information
about Cluster & 500 mts
composite
map& Cluster
Certificate
500 mts Composite map has been issued by AME, Bhilwara vide letter No- 195 on dated
10/03/201.
Cluster certificate has been issued by AME, Bhilwara vide letter No- ME/Bhil/Map/Cluster/M.L.
No. 23/2007/196 on dated 10/03/201.
Final minutes of 4.95th meeting held on 27-29 July, 2021
11. Environment Management
Plan
Annual Expenditure of Rs. 7.70 Lac Per year
Sl. No Description Measures
Capital
Cost
(Rs. In
lakhs)
Recurring Cost (in
lakhs/annum)
1 Air Pollution
Control
Water Sprinkling
Planting plant species
which can control air
pollution along the
approach road.
0.50
0.50
0.50
0.50
2
Water
Pollution
Control
Septic tanks for
workers 1.00 1.00
3 Green Belt
Development
Barrier zone
Near lease area
Approach Road
0.50 0.50
4 Occupational
health
Medical facilities
including periodic health
checkups and first aid
facility for labors.
1.50 1.50
5
Ramps
Garland Drain
Rainwater
harvesting
For protection while
loading and transporting
the mineral ramp will be
constructed.
1.00 1.00
6 Road • Preparation &
Maintenance of Road 2.70 2.70
Total 7.70 7.70
Protection & Conservation of Schedule-I Fauna other than EMP Funds- 6,12,238/-.
12. Green Belt/
Plantation
Annual expenditure of Rs. 0.50Lac Per Year (Recurring Cost)
Total green belt will be the 33% of the mine area 0.741 ha of the area shall be carried out in Statutory Barrier 0.441 hect. & remaining Part of own khatedari land (0.300 Hect.) at village
Fakoliya in Khasra No.1523/1362,1524/1362.
Year
Un-worked
Area
Outside (Own
Remaining Land ) near
the lease area
Statutory
Barrier
Top Soil
Dumps Total
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
1st
Year -- --
0.100 100 0.147 147 -- --
0.247 247
2nd
Year
-- -- 0.100 100 0.147 147
-- -- 0.247 247
3rd
Year
-- -- 0.100 100 0.147 147
-- -- 0.247 247
4th
Year
Maintenance
5th
Year
Maintenance
Total -- -- 0. 300 300 0.441 441 -- -- 0.741 741
Year
Outside (Own Remaining
Land ) near the lease area Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.) No. of Trees
Final minutes of 4.95th meeting held on 27-29 July, 2021
1st Year 0.247 247 -- -- 0.247 247
2nd Year 0.247 247 -- -- 0.247 247
3rd Year 0.247 247 -- -- 0.247 247
Total 0.741 Hect. 741 -- -- 0.741 Hect. 741
Native species which are more suitable to the local environment are preferred to be planted such as like
Neem (Azadiracta indica), Pipal (Ficus religiosa), Mango (Mangifera Indica), Amla (Phyllanthus
Emblica) etc. it is the proposed to invest 2 Lac. Rs. Per annum for greenbelt development.
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining operations,
undertake re-grassing the mining area and any other area which may have been disturbed due to their
mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetary
Breakup for Labour
Annual Expenditure of Rs. 1.00 Lac per annum (Recurring Cost)
Sr. No. Facility provided for Labour Capital Cost in Rs. Recurring cost in Rs.
1. Drinking water facility 30,000/- 30,000/-
2. Health Facility (First aid box, Rest shelter,
Medicine & Washroom) & Insurance
30,000/- 30,000/-
3. Education for Labour children 20,000/- 20,000/-
4. Safety equipment like Ear plug, Dust mask,
hand gloves, Safety Shoes etc.
20,000/- 20,000/-
Total 1,00,000/- 1,00,000/-
14. Present Status Existing lease now proposed for the grant of Environmental Clearance.
Resolution
The SEAC, upon appraisal of the project and having regard to the information
contained in Form-1, Form-2, final EIA/ EMP reports and other documents, submitted by the
PP and presentation made by the PP/ Consultant resolved to recommend to SEIAA for (1.)
Approval of EIA/ EMP with respect to Fakoliya Granite mine cluster formed by AME,
Bhilwara in terms of Notification dated 15.01.2016 and 01.07.2016 of the MoEF & CC and
as defined in the map and the certificate dated 10.03.2021 has LOI and Leases (09) with total
lease area of 23.1322 ha., and production capacity of Cluster- 8,91,669 TPA. (2.) EC to Shri
Ankit Kumar Surya for Fakoliya Granite Mining Project, M.L. No. 23/2007, Area- 2.2447 ha,
Production Capacity– 3,19,742 TPA (ROM) at Khasra No.– 1523/1362, 1524/1362, at
village- Fakoliya, Tehsil- Karera, Dist- Bhilwara, State- Rajasthan, (Proposal No-61868),
covered under the above mentioned cluster comprising total lease area of 23.1322 ha., with
the stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’, with additional condition that the PP shall construct pucca wall on 3 sides of
the Forest land before starting mining activity and that no forest land will be used for
transportation.
Besides the general conditions mentioned in Annexure “A” the SEAC also resolved to
recommend to SEIAA to impose following additional condition:
The PP/all lessees in the cluster shall abide by the mitigation and restoration measures
provided in the final Environment Impact Assessment and Environment Management plan
prepared for the cluster as a whole for Fakoliya Granite Cluster, Total Cluster Area- 23.1322
Final minutes of 4.95th meeting held on 27-29 July, 2021
ha., total no. of mining leases 9, Cluster Production Capacity- 8,91,669 TPA, cluster project
cost 6.20 Crores.
Agenda no. 23. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19624)/ 2019-20
Project Name- EC for Dhuwaliya Granite Mining Project, M.L. No. 22/2021, Area 1.7215
Ha., Khasra No. 1117, 1119, 1335/1119, 1342/1119, Production Capacity 1,70,000 TPA
(ROM) (Saleable Mineral- 85000TPA, Waste- 85000 TPA), Add.- Dhuwaliya, Tehsil-
Kekri, District- Ajmer, (Raj.) (Proposal No.- 215260).
Project Proponent Name- M/s Shri Shyam Minerals, Add.- Khasra No. 117, Vill.-
Dhuwaliya, Tehsil- Kekri, Distt.- Ajmer, (Raj.) (Project Proponent) Shri- Piyush Kumar S/o
Shri Ram Kumar Singh, Add.- Adarsh Colony, Nawalgarh Road, Sikar, Distt.- Sikar, (Raj.)
Email- [email protected]
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
S.N
o.
Particula
rs
Details/Information
1. Cat./ Item
no. (in
schedule):
1 (a)-B2
2. Location
of the
Project
Near village –Dhuwaliya, Tehsil: Kekri, District: Ajmer (Rajasthan)
3. Project
Details
M.L No./ Productio
n
Capacity
M.L. No. : 22/2021
Khasra No. : 1117,1119,1335/1119,1342/1119
Area : 1.7215 Hect. Production (TPA) : 170000TPA(ROM)
Granite (Saleable Mineral- 85000TPA, Waste- 85000 TPA)
Details are given in cover page of Proposal obtaining of Environmental
Clearance
4. Project Cost
Project Cost: Rs1.0 Cr./-(in Rs.) Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water
requirement &
Source
Total water requirement is about 4.0 KLD= 1.0 KLD (Drinking & Domestic Uses)
+ 1.0 KLD (Plantation) + 1.0 KLD (Dust Suppression) + 1.0 KLD (Wet Drilling). Water for Drinking, dust suppression and plantation will be collected from nearby
villages.
6. Fuel &
Energy
Only diesel will be required to run vehicles for transportation. Electricity will be
required for drill machines which will be fulfilled by proposed DG Set.
7. Applicati
on no.,
Date of
Documents
Submitte
d
Category : B2
SEAC FILE NO. : 19624
Date of documents Submitted :15/06/2021
SEAC Meeting No. :4.95thMeeting Agenda Sr. No. :23
Date of Presentation : 28/07/2021
8. Informati
on about
Aravalli Certificate has been issued byAssistant Mining Engineer, Sawarvide
letter No.AME/Sawar/machi/M.L.(LOI)-22/2021/127 on dated 03/06/2021.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Aravalli certificate
9. Date of
Air,
Water, Noise,
monitorin
g
Monitoring was conducted byNoida Testing Laboratories., Approved by NABL,
Noida.
10. Informatio
n about
500 mts
composite map
500 mts composite map has been issued byAssistant Mining Engineer, Sawarvide
letter No. AME/SWR/DRG.NO./43on dated 03/06/2021.
Area falling within 500 mts2.7259 Ha.
11. EMP
Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 5.0 lacs Recurring
Cost: Rs. 5.0lacs per annum.
Sr.
No. Particulars Capital Cost
(in Rs. Lac) Recurring
Cost (in Rs.
Lac)
1. Pollution Control
i) Dust Suppression 3,00,000/- 2,45,000/-
2. Pollution Monitoring
i) Air pollution
ii) Water pollution
-- 10,000/-
3. Green Belt 2,00,000/- 2,45,000/-
Total 5,00,000/- 5,00,000/-
12. Greenbelt
&
Plantation
Expenditure of Green Belt Rs2,45,000/- Total green belt will be the 33% of the mine area 0.567 ha of the area shall be planted in
the part of own Khatedari land at village Dhuwaliya in khasra no. 1117,1119,1335/
1119,1342/1119.
Native specie which are more suitable to the local environment are preferred to be
planted such as like Neem (Azadiractaindica), Pipal (Ficusreligiosa), Mango
(MangiferaIndica), Amla(PhyllanthusEmblica) etc. it is the proposed to invest 2.45 Lac.
Rs. Per annum for greenbelt devlopment
Year
( part of own Khatedari
land at village
Dhuwaliya in khasra
no. 1117,1119,1335/
1119,1342/1119)Outside
the lease area
Top Soil
Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st
Year
0.189 189 -- --
0.189 189
2nd
Year
0.189 189 -- -- 0.189 189
3rd
Year
0.189 189 -- -- 0.189 189
Total 0.567 567 -- -- 0.567 567
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which
may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetar
y breakup
The information regarding Budgetary breakup for labour has been given in PFR &
Power Point Presentation
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Dhuwaliya Granite Mining Project, M.L. No.
22/2021, Area 1.7215 Ha., Production Capacity 1,70,000 TPA (ROM) (Saleable Mineral-
85000TPA, Waste- 85000 TPA), Khasra No. 1117, 1119, 1335/1119, 1342/1119, Add.-
Dhuwaliya, Tehsil- Kekri, District- Ajmer, (Raj.) (Proposal No.- 215260). The project is
covered under B2 category. The SME, Ajmer vide order dated 06.04.2021 has issued LoI to
the PP for mining of Granite. The mining plan has been approved by the SME, Ajmer vide
letter dated 02.06.2021. AME, Sawar in his certificate dated 03.06.2021 has stated that the
mining lease does not fall in Aravalli hills. DCF, Ajmer and DCF, Tonk in their certificates
dated 22.07.2021 and 23.02.2021, respectively have stated that there is no Wildlife
Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine. Besides,
the PP in Form-1 has also stated that there is no WLS, National Park and Conservation
Reserve within 10 Km of the project site.
The project does not involve approval/ clearance under the Forest (Conservation)
Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there
is any Wild Life Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by AME, Sawar on 03.06.2021, the total area of all
the mining leases in the cluster having area of 2.7259 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation resolved to recommend to SEIAA for grant of EC to M/s Shri
Shyam Minerals, for Dhuwaliya Granite Mining Project, M.L. No. 22/2021, Area 1.7215 Ha.,
Production Capacity 1,70,000 TPA (ROM) (Saleable Mineral- 85000 TPA, Waste- 85000
TPA), Khasra No. 1117, 1119, 1335/1119, 1342/1119, Add.- Dhuwaliya, Tehsil- Kekri,
District- Ajmer, (Raj.) (Proposal No.- 215260), with the stipulation that the PP shall abide
by the annual production scheduled specified in mining plan and that any deviation there in
will render the PP liable for legal action in accordance with Environment and Mining Laws,
with the specific and general conditions annexed at Annexure ‘A’. Name of Proponent: M/s
for labour Sr.
No.
Facility provided for Labour Capital Cost in
Rs.
Recurring cost in
Rs.
1. Drinking water facility 20,000/- 25,000/-
2. Health Facility (First aid box, Rest
shelter, Medicine & Washroom) &
Insurance
20,000/- 25,000/-
3. Education for Labour children 20,000/- 25,000/-
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc. 20,000/- 25,000/-
Total 80,000/- 1,00,000/-
14. Present
Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
Shri Shyam Minerals, Add.- Khasra No. 117, Vill.- Dhuwaliya, Tehsil- Kekri, Distt.- Ajmer,
(Raj.) (Project Proponent) Shri- Piyush Kumar S/o Shri Ram Kumar Singh, Add.- Adarsh
Colony, Nawalgarh Road, Sikar, Distt.- Sikar, (Raj.) Email-
[email protected], Consultant Name:- Cognizance Research India Private
Ltd. Add.- Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Agenda no. 24. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19593)/ 2019-20
Project Name- Environmental Clearance for Golpur Sand Stone Mining Project, (Plot No.-
39, Area- 1.00 ha., Production Capacity 1,16,854 TPA (ROM), Khasra No.- 369/5, Near
Vill.- Golpur, Tehsil- Bundi, Distt.-Bundi (Raj.) (Proposal No.-207622).
Project Proponent Name- M/s Sukesh Industries Pvt. Ltd., Project In Charge- Shri Naveen
Jain, Add.- R/o--263/05, Pratap Nagar, Sanganer, Jaipur(Raj.), Email-
Consultant Name- Cognizance Research India Private Ltd., Add.-Office GT-20, Sec 177,
Noida-201301(U.P.),email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no.
(in
Schedule):
1(a) B2
2. Location
of Project
Village: Golpur, Tehsil - Bundi, District - Bundi (Raj.)
Latitude - 25016’01.81950" to 25016’05.06912"
Longitude - 75027’14.20923" to 75027’14.22132"
3. Project
Details
Plot No.
/Productio
n capacity
Plot No. 39
Khasra No.- 369/5
Area- 1.00Hect.
Production capacity - 116854TPA (ROM)
4. Project
Cost:
Project Cost: Rs. 60 Lac.
5. Water
Requireme
nt
& Source
Total water requirement is about 4.0 KLD= 1.0 KLD (Drinking & Domestic Uses) + 1.5
KLD (Plantation) + 1.0 KLD (Dust Suppression). + 0.5KLD (Wet Drilling). Water for
Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel &
Energy:-
No electricity will be required in mining operations as mining will be carried out in day
time only. Diesel will be used for transportation vehicles.
7. Applicatio
n No. &
Category : B2
Final minutes of 4.95th meeting held on 27-29 July, 2021
Date &
documents
submitted
:-
SEAC FILE NO. : 19593
Date of documents Submitted :
SEAC Meeting No. : 4.95
Agenda Sr. No. : 24
Date of Presentation : 28/7/2021
8. Informatio
n about
Aravalli
Certificate
.
Aravalli Certificate has been issued by Mining Engineer, Bundi (Raj.) vide letter No.
ME/Bundi/Machi/2021/344 date 22/3/2021.
Date of
Air/
Noise/Wat
er/Soil
Monitorin
g
Monitoring was conducted by Noida Testing Laboratories, Approved by NABL, Noida
Lab report have been submitted on Dated :- 23/3/2021
9. Informatio
n about
500 mts
composite
map
500 mts composite map has been issued by Mining Engineer, Bundi (Raj.) vide letter No.
ME/Beawar/Composite/Map/249 date 12/7/2021
Area falling within 500 mts 1.00ha.
Cluster Certificate No.: ME/Bundi/Machi/2021/345 date 22/3/2021
10. Environm
ent
Managem
ent Plan
Environment Management Plan Expenditures: Fixed Cost: Rs. 1.40 lacs, Recurring Cost:
Rs. 2.40 lacs per annum.
S.
No. Measures
Capital Cost
(Rs. In lakh.)
Recurring Cost
(Rs. in
lakh./annum)
1
Pollution Control
i) Dust Suppression, Wet
Drilling & Others
50,000/- 1,00,000/-
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
10,000/-
10,000/-
3 Green Belt 80,000/- 1,30,000/-
Total 1,40,000/- 2,40,000/-
11. Green
Belt/
Plantation
Expenditure of Green Belt Rs 1,30,000/-
Total green belt will be the 33% of the mine area 0.330 ha of the area and trees shall be
planted in the Part of Govt. Charagah land at Village Gardara in Khasra No.-58.
Native specie which are more suitable to the local environment are preferred to be
planted such as like Neem (Azadiracta indica), Peepal (Ficus Religiosa), Mango
(Mangifera indica), Shisham (Dalbergia sissoo) etc. it is the proposed to invest 1.30 Lac.
Rs. Per annum for greenbelt development
Year
Outside the lease
area (Part of Govt.
Charagah land at
Village Gardara
in Khasra No.-58)
Top Soil Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Final minutes of 4.95th meeting held on 27-29 July, 2021
1st Year 0.11 110
0.11 110
2nd Year 0.11 110
0.11 110
3rd Year 0.11 110
0.11 110
Total 0.33 330
0.33 330
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which may
have been disturbed due to their mining activities and restore the land to a condition
which is fit for growth of fodder, flora, fauna etc.
12. Budgetary
Breakup
for
Labours
Expenditure of Labour Rs 60,000/-
Sl.
No.
Facility to be Provided for
Laborers
Capital Cost
(Fixed)
Recurring Cost
1 Drinking water facility 10,000/- 25,000/-
2
Health Facility (First aid box,
Rest shelter, Medicine &
Washroom) & Insurance
10,000/-
20,000/-
3
Safety equipment like Ear
plug, Dust mask, hand gloves, Safety Shoes etc.
10,000/-
15,000/-
Total 30,000 60,000/-
13. Present
Status :-
Proposed Mine site (LOI Granted)
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Golpur Sand Stone
Mining Project, (Plot No.- 39, Area- 1.00 ha., Production Capacity 1,16,854 TPA (ROM),
Khasra No.- 369/5, Near Vill.- Golpur, Tehsil- Bundi, Distt.-Bundi (Raj.) (Proposal No.-
207622). The project is covered under B2 category. The SME, Kota vide order dated
22.12.2020 has issued LoI to the PP for mining of Sand Stone. The mining plan has been
approved by the SME, Kota vide letter dated 22.03.2021. ME, Bundi in his certificate dated
22.03.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, MNP, Kota in
his certificate dated 06.04.2021 has stated MHTR is at a distance of 26.21 Km from the
applied lease area. Range Officer, Ramgarh WLS, in his letter dated 08.06.2021 addressed to
DCF, WL, Kota has stated that Ramgarh Vishdhari WLS is at a distance of 25.44 Km from
the applied lease area. There is no Wildlife Sanctuary/National Park/ Conservation Reserve
within 10 km periphery of the mine. The project does not involve approval/ clearance under
the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as no forest land is
involved and neither there is any Wild Life Sanctuary/ National Park within 10 Km from the
project site.
The SEAC considered the certificate dated 22.03.2021 issued by ME, Bundi. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
Resolution:
Final minutes of 4.95th meeting held on 27-29 July, 2021
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Sukesh
Industries Pvt. Ltd., Project In Charge- Shri Naveen Jain for Golpur Sand Stone Mining
Project, Plot No.- 39, Area- 1.00 ha., Production Capacity 1,16,854 TPA (ROM), Khasra
No.- 369/5, Near Vill.- Golpur, Tehsil- Bundi, Distt.- Bundi (Raj.) (Proposal No.-207622),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent M/s Sukesh Industries Pvt. Ltd., Project In
Charge- Shri Naveen Jain, Add.- R/o--263/05, Pratap Nagar, Sanganer, Jaipur(Raj.) Email-
[email protected], Consultant Name:- Cognizance Research India Private Ltd., Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.), email:-
Agenda no. 25. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19604)/ 2019-20
Project Name- EC for Kachariya Granite Mining Project, M.L. No. 15/2021, Area 2.9217
Ha., production capacity:- 2,73,000 TPA (ROM), Khasra No. 238/99, Add.- Kachariya,
Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 214669).
Project Proponent Name- Shri- Natvarlal Sharma S/o Shri- Balkishan Sharma, Add.- Ward
No. 41, Kachariya pith Marg, Kachariya mandir, Kishangarh, tehsil- Kishangarh, Distt.-
Ajmer, (Raj.), Email- [email protected].
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
S.N
o.
Particula
rs
Details/Information
1. Cat./ Item
no. (in
schedule):
1 (a)-B2
2. Location
of the
Project
Near village – Kachariya, Tehsil:- Kishangarh, District- Ajmer, (Rajasthan)
3. Project
Details
M.L No./ Productio
n
Capacity
Plot No. : 15/2021
Khasra No. : 238/99
Area : 2.9217HECT. Production (TPA) : 273000 TPA (ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance (Slides No.: 1)
4. Project
Cost
Project Cost: Rs 1.30 Cr.
Details are given in cover page of Proposal obtaining of Environmental Clearance
(Slides No.: 1)
5. Water
requirem
ent &
Total water requirement is about 4.5 KLD= 2.0 KLD (Drinking & Domestic Uses)
+ 1.0 KLD (Plantation) + 1.0 KLD (Dust Suppression) 0.5 KLD (Wire saw
Cutting). Water for Drinking, dust suppression and plantation will be collected
Final minutes of 4.95th meeting held on 27-29 July, 2021
Source from nearby villages. Details are given in Slide no. 30 of Power Point Presentation.
6. Fuel &
Energy
No electricity will be required in mining operations as mining will be carried out
in day time only.
7. Application no.,
Date of
Documents
Submitte
d
Category : B2 SEAC FILE NO. : 19604
Date of documents Submitted : 12/6/2021
SEAC Meeting No. : 4.95rd Meeting Agenda Sr. No. : 25
Date of Presentation : 28/07/2021
8. Information about
Aravalli
certificate
Aravalli Certificate has been issued by Mining Engineer, Ajmer vide letter No. ME/Ajmer /Map./Arawali Pra-/247 on date 07/06/2021 as Slide No.. 10
9. Date of Air,
Water,
Noise, monitorin
g
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida as Slide No.: 33-34
10. Informatio
n about 500 mts
composite
map
500 mts composite map has been issued by Mining Engineer, Ajmer vide letter
No. ME/Ajmer /Map./Arawali Pra-/248 on date 07/06/2021
as Slide No..: 11 Area falling within 500 mts 2.9217ha.
11. CER Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 6,50,000/- Recurring Cost: Rs. 6,50,000/- per annum.
SI. No. Measures Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring)
1 Pollution Control
i) Dust Suppression 3,00,000/ 3,00,000/-
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
10,000/-
3 Green Belt 3,50,000/ 3,40,000/-
Total 6,50,000/ 6,50,000/
12. Greenbelt &
Plantatio
n
Expenditure of Green Belt Rs 3,40,000/- Total green belt will be the 33% of the lease area 0.96 Ha. of the area will be
planted in the road connected to mine, 7.5 m Statutory barrier, backfilled area
and Remaning part of own khatedari land at village Kachariya in Khasra No. 238/99 .Native specie which are more suitable to the local environment are preferred to
be planted such as like Aam (Mangifera indica), Imli(Tamarindus indica), Neem
(Azadirachta Indica), Shisham (Dalbergia sisso) etc. it is the proposed to invest 3.40Lac.
Rs. Per annum for greenbelt devlopment
Year
Outside the lease area( Remaning part of own
khatedari land at village
Kachariya in Khasra
No. 238/99)
Top Soil Dumps
7.5 m Statutory
barrier,
backfilled area
Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for E C for Kachariya Granite Mining Project,
M.L. No. 15/2021, Area 2.9217 Ha., production capacity:- 2,73,000 TPA (ROM), Khasra
No. 238/99, Add.- Kachariya, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.-
214669). The project is covered under B2 category. The SME, Ajmer vide order dated
23.04.2021 has issued LoI to the PP for mining of Granite. The mining plan has been
approved by the SME, Ajmer vide letter dated 02.06.2021. ME, Ajmer in his certificate dated
07.06.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Ajmer in his
certificate dated 24.05.2021 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
1st
Year 0.25 250 0.071 71 0.32 321
2nd
Year 0.25 250 0.071 71
0.32 321 3rd
Year 0.25 250 0.071 71 0.32 321
Total 0.75 963 0.213 213 0.96 963 Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which
may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetar
y breakup
for labour
The information regarding Budgetary breakup for labour has been given in Power
Point Presentation (Slide No.: 15)
Sr.
No.
Facility to be Provided for
Laborers
Exp. Cost in
Rs.
(Fixed)
Exp. Cost in
Rs.
(Recurring)
1. Drinking water facility 40,000/- 40,000/-
2.
Health Facility (First aid box,
Rest shelter, Medicine &
Washroom) & Insurance
40,000/- 40,000/-
3. Education for Labours children 30,000/- 30,000/-
4.
Safety equipment like Ear plug,
Dust mask, hand gloves, Safety
Shoes etc.
20,000/- 20,000/-
Total 1,30,000/ 1,30,000/-
14. Present
Status
Proposed Mine site.
Final minutes of 4.95th meeting held on 27-29 July, 2021
According to cluster map and cluster certificate dated 07.06.2021 issued by ME,
Ajmer, there is no cluster formation in terms of Notification dated 15.01.2016 and
01.07.2016.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Natvarlal Sharma S/o Shri- Balkishan Sharma for Kachariya Granite Mining Project, M.L.
No. 15/2021, Area 2.9217 Ha., production capacity:- 2,73,000 TPA (ROM), Khasra No.
238/99, Add.- Kachariya, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.-
214669), with the stipulation that the PP shall abide by the annual production scheduled
specified in mining plan and that any deviation there in will render the PP liable for legal
action in accordance with Environment and Mining Laws, with the specific and general
conditions annexed at Annexure ‘A’. Name of Proponent Shri- Natvarlal Sharma S/o Shri-
Balkishan Sharma, Add.- Ward No. 41, Kachariya pith Marg, Kachariya mandir,
Kishangarh, Tehsil- Kishangarh, Distt.- Ajmer, (Raj.), Email
[email protected], Consultant Name:-. Cognizance Research India Private
Ltd. Add.- Office GT-20, Sec 177, Noida- 201301 (U.P.), Email:-
Agenda no. 26. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19605)/ 2019-20
Project Name- EC for Kachariya Granite Mining Project, M.L. No. 13/2021, Area 1.6186
Ha., Production Capacity:- 1,57,080 TPA (ROM) (Saleable Mineral- 59500 TPA, Waste-
59500 TPA & Soil - 38080 TPA), Khasra No. 377/244, Add.- Kachariya, Tehsil-
Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 214993).
Project Proponent Name: Shri Mohanshyam, Add.- Ward No. 41, Kachariya pith Marg,
Kachariya mandir, Kishangarh, Tehsil- Kishangarh, Distt.- Ajmer, (Raj.), Email-
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
S.No. Particulars Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B2
2. Location of
the Project
Near village –Kachariya, Tehsil: Kishangarh, District: Ajmer (Rajasthan)
3. Project Details M.L
No./
Production
Capacity
M.L. No. : 13/2021 Khasra No. : 377/244
Area : 1.6186HECT.
Production
(TPA)
: 157080TPA (ROM) (Saleable Mineral- 59500 TPA, Waste- 59500 TPA &
Soil - 38080 TPA)
Details are given in cover page of Proposal obtaining of
Final minutes of 4.95th meeting held on 27-29 July, 2021
Environmental Clearance
4. Project Cost Project Cost: Rs 1.20 Cr./-(in Rs.)
Details are given in cover page of Proposal obtaining of Environmental
Clearance
5. Water requirement
& Source
Total water requirement is about 8.0 KLD= 3.0 KLD (Drinking &
Domestic Uses) + 2.0 KLD (Plantation) + 1.5 KLD (Dust
Suppression) 1.5 KLD (Wire Saw Cutting). Water for Drinking,
dust suppression and plantation will be collected from nearby
villages.
6. Fuel &
Energy Diesel will be used for transportation vehicles.
7. Application no., Date of
Documents
Submitted
Category : B2 SEAC FILE NO. : 16605
Date of documents Submitted : 12/06/2021
SEAC Meeting No. :4.95thMeeting Agenda Sr. No. :26
Date of Presentation :28/07/2021
8. Information
about Aravalli
certificate
Aravalli Certificate has been issued byMining Engineer, Ajmer (Raj.)
vide letter No. ME/AJ/Composite/Map/Aravali Pra/249 dated 07/06/2021
9. Date of Air,
Water, Noise, monitoring
Monitoring was conducted byNoida Testing Laboratories., Approved by
NABL, Noida
10. Information
about 500 mts composite map
500 mts composite map has been issued byMining Engineer, Kishangarh
(Raj.) vide letter No. ME/AJ/Composite/Map/Aravali Pra/250 dated 07/06/2021
Area falling within 500 mts 1.6186ha.
11. Environment
Management
Plan
Environment Management Plan Expenditures: Capital Cost : Rs. 6.0 Lac.
Recurring Cost : Rs. 6.0 Lac per annum.
SI.
No. Measures
Exp. Cost in
Rs.
(Fixed)
Exp. Cost in
Rs.
(Recurring)
1 Pollution Control
i) Dust Suppression 2,75,000/- 2,75,000/-
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
15,000/- 15,000/-
3 Green Belt 3,10,000/- 3,10,000/-
Total 6,00,000/- 6,00,000/-
12. Greenbelt &
Plantation Expenditure of EMP Rs 3,10,000/- Total green belt will be the 33% of the mine area 0.534 ha shall be planted in
the Remaining Part of Own Khatedari land at village- Kachariya in Khasra No. 377/244.
Native specie which are more suitable to the local environment are preferred
to be planted such as like Neem (Azadiracta indica), Peepal (Ficus religiosa), Mango (Mangifera indica ), Shisham ( Dalbergia sissoo ) etc.
Source- district survey report.
Year Outside the
lease area( Part
of Own
Khatedari land
at village-
Top Soil
Dumps Total
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for E C for Kachariya Granite Mining Project, M.L.
No. 13/2021, Area 1.6186 Ha., Production Capacity:- 1,57,080 TPA (ROM) (Saleable
Mineral- 59500 TPA, Waste- 59500 TPA & Soil - 38080 TPA), Khasra No. 377/244, Add.-
Kachariya, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 214993). The project
is covered under B2 category. The SME, Ajmer vide order dated 23.04.2021 has issued LoI
to the PP for mining of Granite. The mining plan has been approved by the SME, Ajmer vide
letter dated 02.06.2021. ME, Ajmer in his certificate dated 07.06.2021 has stated that the
mining lease does not fall in Aravalli hills. DCF, Ajmer in his certificate dated 24.05.2021
has stated that there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10
km periphery of the mine. The project does not involve approval/ clearance under the Forest
(Conservation) Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved
Kachariya in
Khasra No.
377/244)
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st
Year 0.178 178
-- -- 0.178 178
2nd
Year 0.178 178
-- -- 0.178 178
3rd
Year 0.178 178
-- -- 0.178 178
Total 0.534 534 -- -- 0.534 534
Note:- The mining lease holders shall, after ceasing mining operations,
undertake re-grassing the mining area and any other area which may have
been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.”The lease shall
comply all conditions as per on 16/1/2020.
13. Budgetary breakup for
labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation.
Sr.
No.
Facility provided for Labour Exp. Cost in
Rs.
(Fixed)
Exp. Cost in
Rs.
(Recurring)
1. Drinking water facility 40,000/- 40,000/-
2. Health Facility (First aid box,
Rest shelter, Medicine &
Washroom) & Insurance
50,000/- 50,000/-
3. Education for Labours children 20,000/- 20,000/-
4. Safety equipment like Ear plug,
Dust mask, hand gloves, Safety
Shoes etc.
10,000/- 10,000/-
Total 1,20,000/- 1,20,000/-
14. Present Status Proposed Mine site.
Final minutes of 4.95th meeting held on 27-29 July, 2021
and neither there is any Wild Life Sanctuary/ National Park within 10 Km from the project
site.
According to cluster map and cluster certificate dated 07.06.2021 issued by ME,
Ajmer, there is no cluster formation in terms of Notification dated 15.01.2016 and
01.07.2016.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri
Mohanshyam for Kachariya Granite Mining Project, M.L. No. 13/2021, Area 1.6186 Ha.,
Production Capacity:- 1,57,080 TPA (ROM) (Saleable Mineral- 59500 TPA, Waste- 59500
TPA & Soil - 38080 TPA), Khasra No. 377/244, Add.- Kachariya, Tehsil- Kishangarh,
District- Ajmer, (Raj.) (Proposal No.- 214993), with the stipulation that the PP shall abide
by the annual production scheduled specified in mining plan and that any deviation there in
will render the PP liable for legal action in accordance with Environment and Mining Laws,
with the specific and general conditions annexed at Annexure ‘A’. Name of Proponent: Shri
Mohanshyam, Add.- Ward No. 41, Kachariya pith Marg, Kachariya mandir, Kishangarh,
tehsil- Kishangarh, Distt.- Ajmer, (Raj.), Email- [email protected],
Consultant Name:- Cognizance Research India Private Ltd. Add.- Office GT-20, Sec 177,
Noida- 201301 (U.P.) Email:- [email protected].
Agenda no. 27. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19609)/ 2019-20
Project Name- Environmental Clearance for Pipliya Granite Mining Project, Ref. No-
20211000031500, Area- 2.2258 ha., Production capacity:- 1,76,215 TPA (ROM), Khasra No-
777/3, 768/3, at Village- Pipliya, Tehsil- Malpura, District- Tonk, State-Rajasthan, (Proposal
No-214738).
Project Proponent Name- Shri Rajesh Yadav, Co-Applicant- Shri Kamlesh, Add-
Chavandiya, Tonk, Rajasthan, [email protected].
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Pipliya Granite
Mining Project, Ref. No-20211000031500, Area- 2.2258 ha., Production capacity:- 1,76,215
TPA (ROM), Khasra No-777/3, 768/3, at Village- Pipliya, Tehsil- Malpura, District- Tonk,
State-Rajasthan, (Proposal No-214738). The project is covered under B2 category. The
SME, Jaipur vide order dated 12.02.2021 has issued LoI to the PP for mining of Granite. The
Final minutes of 4.95th meeting held on 27-29 July, 2021
mining plan has been approved by the SME, Jaipur vide letter dated 09.06.2021. AME, Tonk
in his certificate dated 08.06.2021 has stated that the mining lease does not fall in Aravalli
hills.
The SEAC considered the certificate dated 08.06.2021 issued by AME, Tonk. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit certificate from DCF, Tonk and DCF, Jaipur,
regarding existence or otherwise of National Park or Wildlife Sanctuary from the applied
lease area, within a period of 45 days failing which the project shall be recommended to
SEIAA for closure and delistment.
Agenda no. 28. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2( 19610)/ 2019-20
Project Name- EC for Udaipur Khurd Granite Mining Project, M.L. No. 09/2021, Area
1.1057 Ha., Khasra No. 351/224, Production Capacity- 1,18,684 TPA (ROM), Add.-
Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 213932).
Project Proponent Name:- M/s Raghupati Mines & Minerals, Add.- LG-03 Murliwala
Tower Jaipur Road, Tehsil.- Madanganj- Kishangarh, Distt.- Ajmer, (Raj.), Email-
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no. (in
Schedule):
1(a) B2
2. Location of Project Village - Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer (Raj.)
3. Project Details
ML No. /Production
capacity
M.L. No. - 09/2021,
Khasra No.- 351/224
Area- 1.1057 Hect.
Production (TPA) - 118684 TPA (ROM)
4. Project Cost: Project Cost: Rs. 1 Cr.
5. Water Requirement
& Source
Total water requirement is about 8.0 KLD = 2.0 KLD (Drinking & Domestic
Uses) + 1.5 KLD (Plantation) + 2.0 KLD (Dust Suppression) + 2.5 KLD (Wire
Saw cutting & Wet Drilling). Water for Drinking, dust suppression and plantation
will be collected from nearby villages.
6. Fuel & Energy:- Electricity will be required for drill machines which will be fulfilled by proposed
Final minutes of 4.95th meeting held on 27-29 July, 2021
DG Set. Diesel will be required to run vehicles for transportation.
7. Application No. & Date
& documents submitted
:-
Category : B2
SEAC FILE NO. : 19610
Date of documents Submitted : 12/06/2021
SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 28
Date of Presentation : 28/07/2021
8. Information about
Aravalli Certificate.
Aravalli Certificate has been issued by Mining Engineer, Ajmer (Raj.) vide letter
No. ME/Aj/Composit/Machi/Aravali Pra-/305 dated 16/07/2021
Date of Air/Water/
Noise Monitoring
Monitoring was conducted by Noida Testing Laboratories, Approved by NABL,
Noida
Lab report have been submitted on Dated :- 12/06/2021
9. Information about 500
mts composite map
500 mts composite map has been issued by Mining Engineer, Ajmer (Raj.) vide
letter No. ME/Aj/Composit/Machi/Aravali Pra-/305 dated 16/07/2021
Area falling within 500 mts 1.1057 ha.
Cluster Certificate No.: ME/Aj/Composit/Machi/Aravali Pra-/306 dated
16/07/2021
10. Environment
Management Plan
Environment Management Plan Expenditures: Fixed Cost: Rs. 5.00 lacs,
Recurring Cost: Rs. 5.00 lacs per annum.
SI.
No. Measures
Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring)
1
Pollution Control
i) Dust Suppression & Wet
Drilling
3,05,000/- 2,90,000/-
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
- 15,000/-
3 Green Belt 1,95,000/- 1,95,000/-
Total 5,00,000/- 5,00,000/-
11. Greenbelt & Plantation Expenditure Green Belt Rs 1,95,000/-
Total green belt will be the 33% of the mine area 0.364 ha of the area and trees
shall be planted in Remaining part of own khatedari Land at village Udaipur
Khurd in Khasra No.- 351/224. Native specie which are more suitable to the
local environment are preferred to be planted such as like Neem (Azadiracta
indica), Peepal (Ficus Religiosa), Mango (Mangifera indica), Shisham
(Dalbergia sissoo) etc. it is the proposed to invest 1.95 Lac. Rs. Per annum for
greenbelt devlopment
Year
Outside the lease area
(Remaining Part of own
Khatedari land at village
Udaipur Khurd in Khasra
No. 436/348, 348/112,
349/112)
Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Final minutes of 4.95th meeting held on 27-29 July, 2021
1st Year 0.121 121 0.121 121
2nd Year 0.121 121 0.121 121
3rd Year 0.122 122 0.122 122
Total 0.364 364 0.364 364
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after
ceasing mining operations, undertake re-grassing the mining area and any
other area which may have been disturbed due to their mining activities and
restore the land to a condition which is fit for growth of fodder, flora, fauna
etc.
12. Budgetary Breakup for
Labour
Expenditure of Labour Rs 1,00,000/-
Sr.
No.
Facility to be Provided for
Laborers
Exp. Cost in
Rs.
(Fixed)
Exp. Cost in
Rs.
(Recurring)
1. Drinking water facility 30,000/- 30,000/-
2.
Health Facility (First aid box,
Rest shelter, Medicine &
Washroom) & Insurance
30,000/- 30,000/-
3. Education for Labours children 25,000/- 25,000/-
4.
Safety equipment like Ear plug,
Dust mask, hand gloves, Safety
Shoes etc.
15,000/- 15,000/-
Total 1,00,000/- 1,00,000/-
13. Present Status :- Proposed Mine site (LOI Granted)
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Udaipur Khurd Granite Mining Project,
M.L. No. 09/2021, Area 1.1057 Ha., Khasra No. 351/224, Production Capacity- 1,18,684
TPA (ROM), Add.- Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal
No.- 213932). The project is covered under B2 category. The SME, Ajmer vide order dated
23.04.2021 has issued LoI to the PP for mining of Granite. The mining plan has been
approved by the SME, Ajmer vide letter dated 02.06.2021. ME, Ajmer in his certificate dated
16.07.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Ajmer in his
certificate dated 24.05.2021 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
According to cluster map and cluster certificate dated 16.07.2021 issued by ME,
Ajmer, there is no cluster formation in terms of Notification dated 15.01.2016 and
01.07.2016.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1, Form-2, Pre-feasibility report and other documents and having regard to the submissions
Final minutes of 4.95th meeting held on 27-29 July, 2021
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s
Raghupati Mines & Minerals, for Udaipur Khurd Granite Mining Project, M.L. No. 09/2021,
Area 1.1057 Ha., Production Capacity- 1,18,684 TPA (ROM), Khasra No. 351/224, Add.-
Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 213932), with
the stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent :- M/s Raghupati Mines & Minerals, Add.- LG-03
Murliwala Tower Jaipur Road, Tehsil.- Madanganj- Kishangarh, Distt.- Ajmer, (Raj.), Email-
[email protected], Consultant Name:- Cognizance Research India Private
Ltd. Add.- Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Agenda no. 29. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19611/ 2019-20
Project Name- EC for Udaipur Khurd Masonary Stone Mining Project, M.L. No. 22/2020,
Area 1.6893 Ha., Production Capacity- 2,63,158 TPA (ROM), Khasra No. 348/112, 349/112
and 436/348, Add.- Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal
No.- 211368).
Project Proponent Name- M/s Shree Ji Stonex, Add.- N.H.8, Veer Taja Market, RAmner
Choraha, Ajmer Bypass, Tehil- Kishangarh, Distt.- Ajmer, (Raj.), Email-
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no.
(in
Schedule):
1(a) B2
2. Location of
Project
Village: Udaipurkhurd, Tehsil - Kishangarh, District - Ajmer (Raj.)
Latitude - 26031’11.80196" to 26031’16.84456" N
Longitude - 74051’53.38545” to 74051’58.46638" E
3. Project
Details
M.L. No.
/Production
capacity
M.L. No. 22/2020
Khasra No.- 348/112, 349/112 & 436/348
Area- 1.6893 Hect.
Production capacity - 263158 TPA (ROM)
4. Project
Cost:
Project Cost: Rs. 50 Lac.
5. Water
Requiremen
Total water requirement is about 4.0 KLD= 2.0 KLD (Drinking & Domestic Uses) + 1.0
Final minutes of 4.95th meeting held on 27-29 July, 2021
t
& Source
KLD (Plantation) + 1.0 KLD (Dust Suppression). Water for Drinking, dust suppression
and plantation will be collected from nearby villages.
6. Fuel &
Energy:-
No electricity will be required in mining operations as mining will be carried out in day
time only. Diesel will be used for transportation vehicles.
7. Application
No. & Date
&
documents
submitted :-
Category : B2
SEAC FILE NO. : 19611
Date of documents Submitted : 19/05/2021
SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 29
Date of Presentation : 28/07/2021
8. Information
about
Aravalli
Certificate.
Aravalli Certificate has been issued by Mining Engineer, Ajmer (Raj.) vide letter No.
ME/Aj/Composit/Machi/Aravali Pra-/207 dated 06/05/2021
Date of Air/
Noise/Water
/Soil
Monitoring
Monitoring was conducted by Noida Testing Laboratories, Approved by NABL, Noida
Lab report have been submitted on Dated :- 12/06/2021
9. Information
about 500
mts
composite
map
500 mts composite map has been issued by Mining Engineer, Ajmer (Raj.) vide letter No.
ME/Aj/Composit/Machi/Aravali Pra-/207 dated 06/05/2021
Area falling within 500 mts 1.6893 ha.
Cluster Certificate No.: ME/Aj/Composit/Machi/Aravali Pra-/208 dated 06/05/2021
10. Environmen
t
Managemen
t Plan
Environment Management Plan Expenditures: Fixed Cost: Rs. 2.50 lacs, Recurring Cost:
Rs. 2.50 lacs per annum.
SI. No. Measures Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring)
1
Pollution Control
i) Dust Suppression & Wet
Drilling
1,25,000 1,15,000
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
- 10,000/-
3 Green Belt 1,25,000 1,25,000
Total 2,50,000/- 2,50,000/-
11. Green Belt/
Plantation
Expenditure of Green Belt Rs 1,25,000/-
Total green belt will be the 33% of the mine area 0.557 ha of the area and trees shall be
planted in 7.5m Statutory Barrier and Remaining part of own Khatedari land at village
Udaipur Khurd in Khasra No. 436/348, 348/112, 349/112. Native specie which are more
suitable to the local environment are preferred to be planted such as like Neem
(Azadiracta indica), Peepal (Ficus Religiosa), Mango (Mangifera indica), Shisham
(Dalbergia sissoo) etc. it is the proposed to invest 1.25 Lac. Rs. Per annum for greenbelt
Final minutes of 4.95th meeting held on 27-29 July, 2021
development
Year
7.5m Statutory
Barrier
Remaining Part of
own Khatedari land
at village Udaipur
Khurd in Khasra No.
436/348, 348/112,
349/112
Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st Year 0.076 76 0.11 110 0.186 186
2nd Year 0.076 76 0.11 110 0.186 186
3rd Year 0.075 75 0.11 110 0.185 185
Total 0.227 227 0.33 330 0.557 557
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which
may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
12. Budgetary
Breakup for
Labours
Expenditure of Labour Rs 50,000/-
Sr.
No.
Facility to be Provided for
Laborers
Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring)
1. Drinking water facility 15,000/- 15,000/-
2.
Health Facility (First aid box, Rest
shelter, Medicine & Washroom) &
Insurance
15,000/- 15,000/-
3. Education for Labour children 10,000/- 10,000/-
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc. 10,000/- 10,000/-
Total 50,000/- 50,000
13. Present
Status :-
Proposed Mine site (LOI Granted)
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Udaipur Khurd Masonary Stone Mining
Project, M.L. No. 22/2020, Area 1.6893 Ha., Production Capacity- 2,63,158 TPA (ROM),
Khasra No. 348/112, 349/112 and 436/348, Add.- Udaipur Khurd, Tehsil- Kishangarh,
District- Ajmer, (Raj.) (Proposal No.- 211368). The project is covered under B2 category.
The SME, Ajmer vide order dated 23.02.2021 has issued LoI to the PP for mining of
Masonry Stone. The mining plan has been approved by the SME, Ajmer vide letter dated
15.04.2021. ME, Ajmer in his certificate dated 06.05.2021 has stated that the mining lease
does not fall in Aravalli hills. DCF, Ajmer in its certificate dated 22.07.2021 has stated that
there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery
of the mine. The project does not involve approval clearance under the Forest (Conservation)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there
is any Wild Life Sanctuary/ National Park within 10 Km from the project site.
According to cluster map and cluster certificate dated 06.05.2021 issued by ME, Ajmer,
there is no cluster formation in terms of Notification dated 15.01.2016 and 01.07.2016.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1, Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Shree Ji
Stonex, for Udaipur Khurd Masonary Stone Mining Project, M.L. No. 22/2020, Area 1.6893
Ha., Production Capacity- 2,63,158 TPA (ROM), Khasra No. 348/112, 349/112 and 436/348,
Add.- Udaipur Khurd, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 211368),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent M/s Shree Ji Stonex, Add.- N.H.8, Veer
Taja Market, RAmner Choraha, Ajmer Bypass, Tehil- Kishangarh, Distt.- Ajmer, (Raj.)
Email- [email protected], Consultant Name:- Cognizance Research India Private
Ltd. Add.- Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Agenda no. 30. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19612)/ 2019-20
Project Name- EC for Morajhari Granite Mining Project, Plot No. 106, Area 1.44 Ha.,
Production Capacity – 2,00,000 TPA (ROM), Khasra No. 1473 & 1735, Add.- Morajhari,
Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213570).
Project Proponent Name Shri- Raghav Chhaparwal S/o Shri- Shiv Prakash Chhaparwal,
Add.- Morajhari, Tehil- Nasirabad, Distt.- Ajmer, (Raj.) Email-
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /
Item no.
(in
Schedule):
1(a) B2
2. Location of
Project
Village: Morajhari, Tehsil - Nasirabad, District - Ajmer (Raj.)
Latitude - 260 17’59.04741” to 260 17’59.72262”
Longitude - 740 55’38.57376” to 740 55’42.83612”
3. Project
Details
Plot No.
Plot No. 106
Khasra No.- 1473 & 1735
Final minutes of 4.95th meeting held on 27-29 July, 2021
/Production
capacity
Area- 1.44Hect.
Production capacity - 200000TPA (ROM)
4. Project
Cost:
Project Cost: Rs. 4Cr.
5. Water
Requiremen
t
& Source
Total water requirement is about 4.0 KLD= 1.0 KLD (Drinking & Domestic Uses) + 1.0 KLD
(Plantation) + 1.0 KLD (Dust Suppression). +1.0 KLD (Wire Saw cutting & Wet Drilling). Water for
Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel & Energy:-
No electricity will be required in mining operations as mining will be carried out in day time only. Diesel will be used for transportation vehicles.
7. Application
No. & Date
&
documents
submitted :-
Category : B2
SEAC FILE NO. : 19612
Date of documents Submitted :
SEAC Meeting No. : 4.95
Agenda Sr. No. : 30
Date of Presentation : 28/7/2021
8. Information
about
Aravalli
Certificate.
Aravalli Certificate has been issued by Mining Engineer, Ajmer (Raj.) vide letter No.
SME/Aj/Mining Plan/F-A-119/2021/3756 date 10/6/2021.
Date of Air/
Noise/Wate
r/Soil
Monitoring
Monitoring was conducted by Noida Testing Laboratories, Approved by NABL, Noida
Lab report have been submitted on Dated :- 12/6/2021
9. Information
about 500
mts
composite
map
500 mts composite map has been issued by Mining Engineer, Ajmer (Raj.) vide letter No.
ME/Beawar/Composite/Map/249 date 12/7/2021
Area falling within 500 mts 1.00ha.
Cluster Certificate No.: ME/AJ/Composite/Machi/Aravali Pra-/214 date 25/5/2021
10. Environme
nt
Manageme
nt Plan
Environment Management Plan Expenditures: Fixed Cost: Rs. 3.0 lacs, Recurring Cost: Rs. 20.0 lacs per annum.
S.
No. Measures
Capital Cost
(Rs. In lakh.)
Recurring Cost
(Rs. in
lakh./annum)
1 Pollution Control i) Dust Suppression, Wet Drilling & Others
90,000/- 3,85,000/-
2 Pollution Monitoring i) Air pollution ii) Water pollution
10,000/- 15,000/-
3 Green Belt 1,00,000/- 2,00,000/-
4 Road Maintenance 1,00,000/- 8,00,000/-
Total 3,00,000/- 20,00,000/-
11. Green Belt/
Plantation
Expenditure of Green Belt Rs 2,00,000/-
Total green belt will be the 33% of the mine area 0.474 ha of the area shall be carried out part of
Govt. Charagah. Land at Village Morajhari in Khasra No. 23.
Native specie which are more suitable to the local environment are preferred to be planted such as
like Neem (Azadiracta indica), Peepal (Ficus Religiosa), Mango (Mangifera indica), Shisham
Final minutes of 4.95th meeting held on 27-29 July, 2021
(Dalbergia sissoo) etc. it is the proposed to invest 2.0 Lac. Rs. Per annum for greenbelt development
Year
Outside the lease
area (part of Govt.
Charagah. Land at
Village Morajhari in
Khasra No. 23)
7.5 m Statuary barrier
& Top Soil Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st Year 0.158 158
0.158 158
2nd Year 0.158 158
0.158 158
3rd Year 0.158 158
0.158 158
Total 0.474 474
0.474 474
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth
of fodder, flora, fauna etc.
12. Budgetary
Breakup for
Labours
Expenditure of Labour Rs 4,00,000/-
Sl.
No.
Facility to be Provided for
Laborers
Capital Cost
(Fixed)
Recurring Cost
1 Drinking water facility 30,000/- 1,30,000/-
2 Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
25,000/- 1,00,000/-
3 Education for labor’s children 25,000/- 1,00,000/-
4 Safety equipment like Ear plug, Dust mask, hand gloves, Safety Shoes etc.
20,000/- 70,000/-
Total 1,00,000 4,00,000/-
13. Present
Status :-
Proposed Mine site (LOI Granted)
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Morajhari Granite Mining Project, Plot
No. 106, Area 1.44 Ha., Production Capacity – 2,00,000 TPA (ROM), Khasra No. 1473 &
1735, Add.- Morajhari, Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213570).
The project is covered under B2 category. The SME, Ajmer vide order dated 28.04.2021 has
issued LoI to the PP for mining of Granite. The mining plan has been approved by the SME,
Ajmer vide letter dated 10.06.2021. ME, Ajmer in his certificate dated 25.05.2021 has stated
that the mining lease does not fall in Aravalli hills. DCF, Ajmer in its certificate dated
04.06.2021 has stated that there is no Wildlife Sanctuary/National Park/ Conservation
Reserve within 10 km periphery of the mine. The project does not involve approval/
clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as
no forest land is involved and neither there is any Wild Life Sanctuary/ National Park within
10 Km from the project site.
According to cluster map and cluster certificate dated 25.05.2021 issued by ME,
Ajmer, there is no cluster formation in terms of Notification dated 15.01.2016 and
01.07.2016.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Raghav
Chhaparwal S/o Shri- Shiv Prakash Chhaparwal for Morajhari Granite Mining Project, Plot
No. 106, Area 1.44 Ha., Production Capacity – 2,00,000 TPA (ROM), Khasra No. 1473 &
1735, Add.- Morajhari, Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213570).
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent Shri- Raghav Chhaparwal S/o Shri- Shiv
Prakash Chhaparwal, Add.- Morajhari, Tehil- Nasirabad, Distt.- Ajmer, (Raj.), Email-
[email protected], Consultant Name:- Cognizance Research India Private Ltd.
Add.-Office GT-20, Sec 177, Noida- 201301 (U.P.), Email:-
Agenda no. 31. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19613)/ 2019-20
Project Name- EC for Morajhari Granite Mining Project, Plot No. 109, Area 1.32 Ha., ,
Production Capacity- 1,88,412 TPA (ROM), Khasra No. 1473 & 1735, Add.- Morajhari,
Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213575).
Project Proponent Name- Shri- Raghav Chhaparwal S/o Shri- Shiv Prakash Chhaparwal,
Add.- Morajhari, Tehil- Nasirabad, Distt.- Ajmer, (Raj.), Email-
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.(in
Schedule):
1(a) B2
2. Location of Project Village – Morajhari, Tehsil- Nasirabad, District- Ajmer (Raj.)
Latitude : 260 17‘59.04741'' to 260 18‘07.40633''
Longitude : 740 55'39.32287'' to 750 55‘43.97922''
3. Project Details
M.L No. /Production
capacity
(Plot No.- 109),
Khasra No. 1473 & 1735
Area - 1.32 Hect.
Prop. Production Capacity - 188412 TPA (ROM)
4. Project Cost: Rs. 3 Cr.
Final minutes of 4.95th meeting held on 27-29 July, 2021
5. Water Requirement
& Source
Total water requirement is about 8.0 KLD = 2.0 KLD (Drinking & Domestic Uses) + 2.0 KLD
(Plantation) + 1.0 KLD (Dust Suppression) + 3.0 KLD (Wire Saw cutting & Wet Drilling).
Drinking water will be brought from the nearby Tube-wells and water for dust suppression and
plantation will be collected from nearby villages.
6. Fuel & Energy:- Only diesel will be required to run vehicles for transportation. No electricity will be needed in the
proposed project.
7. Application No. & Date
& documents submitted
:-
Category : B2 SEAC FILE NO. : 19613
Date of documents Submitted : 12/6/2021
SEAC Meeting No. : 4.95th Meeting
Agenda Sr. No. : 31
Date of Presentation : 28/07/2021
8. Information about
Aravalli Certificate.
Aravalli Certificate has been issued by Mining Engineer, Ajmer vide letter No.
ME/Aj/Composite/Map/Aravalli Pra-/215 dated 25/5/2021
9. Date of
Air/Water/Noise
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida
10. Information about 500
mts composite map
500 mts composite map has been issued by Mining Engineer, Ajmer vide letter No.
ME/Aj/Composite/Map/Aravalli Pra-/216 dated 25/5/2021
Area falling within 500 mts is 1.32 ha
11. Environment
Management Plan
Environment Management Plan Expenditures: Capital Cost: Rs. 12,00,000/- Recurring Cost: Rs
12,00,000/- per annum
SI. No. Measures Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring Yearly)
1
Pollution Control
i) Road Preparation and maintenance
ii) Dust Suppression & Wet Drilling & other
6,00,000/- 6,00,000
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
-- 15,000/-
3 Green Belt 6,00,000/- 5,85,000
Total 12,00,000/- 12,00,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
12. Green Belt/ Plantation Expenditure of Green Belt Rs 5,85,000/-per year
Total green belt will be the 33% of the mine area 0.435 ha of the area will be planted in the part of
govt. charagrah land at village Morajhari in khasra no. 23
Native specie which are more suitable to the local environment are preferred to be planted such as
like Neem (Azadiracta indica), Pipal (Ficus religiosa), Babool (Acacia nilotica), Kher (Acacia
catechu) etc. it is the proposed to invest 5,85,000 Rs. Per annum for greenbelt development
Year
Outside the lease
area(part of govt
charagrah land at village
Morajhari in khasra no.
23)
Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st Year 0.145 145 -- -- 0.145 145
2nd Year 0.145 145 -- -- 0.145 145
3rd Year 0.145 145 -- -- 0.145 145
Total 0.435
Hect.
435 -- -- 0.435
Hect.
435
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for
growth of fodder, flora, fauna etc.
13. Budgetary Breakup for
Labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point
Presentation
Sr. No. Facility to be Provided for Laborers Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring Yearly)
1. Drinking water facility 80,000 80,000
2.
Health Facility (First aid box, Rest
shelter, Medicine & Washroom) &
Insurance
80,000 80,000
3. Education for Labours children 70,000 70,000
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc. 70,000 70,000
Total 3,00,000 1,50,000
14. Present Status :- LOI Granted
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Morajhari Granite Mining Project, Plot
No. 109, Area 1.32 Ha., Production Capacity- 1,88,412 TPA (ROM), Khasra No. 1473 &
1735, Add.- Morajhari, Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213575).
The project is covered under B2 category. The SME, Ajmer vide order dated 28.04.2021 has
issued LoI to the PP for mining of Granite. The mining plan has been approved by the SME,
Ajmer vide letter dated 10.06.2021. ME, Ajmer in his certificate dated 25.05.2021 has stated
that the mining lease does not fall in Aravalli hills. DCF, Ajmer in his certificate dated
Final minutes of 4.95th meeting held on 27-29 July, 2021
04.06.2021 has stated that there is no Wildlife Sanctuary/National Park/ Conservation
Reserve within 10 km periphery of the mine. The project does not involve approval/
clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as
no forest land is involved and neither there is any Wild Life Sanctuary/ National Park within
10 Km from the project site.
According to cluster map and cluster certificate dated 25.05.2021 issued by ME, Ajmer,
there is no cluster formation in terms of Notification dated 15.01.2016 and 01.07.2016.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Raghav
Chhaparwal S/o Shri- Shiv Prakash Chhaparwal, for Morajhari Granite Mining Project, Plot
No. 109, Area 1.32 Ha., Production Capacity- 1,88,412 TPA (ROM), Khasra No. 1473 &
1735, Add.- Morajhari, Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 213575),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent Shri- Raghav Chhaparwal S/o Shri- Shiv
Prakash Chhaparwal, Add.- Morajhari, Tehil- Nasirabad, Distt.- Ajmer, (Raj.) Email-
[email protected], Consultant Name:- Cognizance Research India Private Ltd.
Add.-Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Agenda no. 32. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19614)/ 2019-20
Project Name- EC for Ladera Granite Mining Project, Ref. No. 2019100002852, Area
1.0308 Ha., Khasra No. 1743/1177 & 1178, Production capacity 84000 TPA(ROM) Add.-
Ladera, Tehsil- Dudu, District- Jaipur, (Raj.) (Proposal No.- 208660)
Project Proponent Name- M/s Unique Granites, Add.- Shah Gokul Chand Manohar Lal
Near Balaji Temple, Kishangarh, Distt.- Ajmer, (Raj.) Shri- Abhishek Baheti S/o Shri- Jugal
Kishor Baheti, Add.- Baheti Bhavan, Katla Bazar, Madangaj, Kishangarh, Distt.- Ajmer,
(Raj.) Email- [email protected]
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Observations and Resolution of the committee:-
The PP vide letter dated 28.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Agenda no. 33. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19615)/ 2019-20
Project Name- Environmental Clearance for Amargarh (Chang) Granite Mining Project, Plot
No.- 48, Area-2.00 ha., Production Capacity -2,33,516 TPA (ROM), Khasra no 84, Near
Vill.- Amargarh, Tehsil- Raipur, Distt.-Pali(Raj.) (Proposal No.-211255).
Project Proponent Name- Shri Pushpendra Singh, Add.- R/o--Behind Shiv Temple, Jaton
Ka Bans, Jasnagar, Tehsil- Riyanbadi, Distt.- Nagaur (Raj.) Email-
Consultant Name- Cognizance Research India Private Ltd., Add.-Office GT-20, Sec 177,
Noida- 201301 (U.P.)email:- [email protected].
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Amargarh (Chang)
Granite Mining Project, Plot No.- 48, Area-2.00 ha., Production Capacity- 2,33,516 TPA
(ROM), Khasra no 84, Near Vill.- Amargarh, Tehsil- Raipur, Distt.-Pali(Raj.) (Proposal No.-
211255). The project is covered under B2 category. The SME, Ajmer vide order dated
21.12.2020 has issued LoI to the PP for mining of Granite. The mining plan has been
approved by the SME, Ajmer vide letter dated 25.03.2021 ME, Beawar in his certificate
dated 12.04.2021 has stated that the mining lease does not fall in Aravalli hills.
The SEAC considered the certificate dated 12.04.2021 issued by ME, Beawar. In
the certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is
no other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The PP has not
clearly stated the place where green belt will be developed and permission of the competent
authority/ person to develop green belt on that land. The SEAC, therefore, decided to ask the
PP to submit the same within a period of 45 days failing which the project shall be
recommended to SEIAA for closure and delistment.
Agenda no. 34. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19616)/ 2019-20
Project Name- Environmental Clearance for Rambari Quartz & Feldspar Mining Project,
ML. No.- 10/2009, Area- 4.00 ha., Production capacity- 93,272 TPA (ROM), Khasra No.
124,125,126,120,117,118, Near Vill.- Rambari, Tehsil- Nasirbad, Distt.- Ajmer(Raj.)
(Proposal No.- 211340).
Project Proponent Name- Shri Chand Mohammad, Add.- R/o- Near Bus Stand, Vill.-
Ramsar, Tehsil- Nasirabad, Distt.- Ajmer (Raj.), Email- [email protected].
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name- Cognizance Research India Private Ltd., Add.-Office GT-20, Sec 177,
Noida-201301(U.P.)email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
S.
No
.
Partic
ulars
Details/Information
1. Cat./ Item
no. (in schedule):
1 (a)-B2
2. Location of the Project
Near village –Rambari, Tehsil: Nasirabad, District: Ajmer(Rajasthan)
3. Project Details M.L No./ Production
Capacity
M.L. No. : 10/2009 Khasra No. : 124,125,126,120,117,118 Area : 4.0HECT.
Production (TPA)
: 93272 TPA(ROM) Quartz &Feldspar (Saleable Mineral- 35045TPA, Waste- 16174TPA& Sub Grade- 42053 TPA)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Project Cost
Project Cost: Rs80.0lacs/-(in Rs.) Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water requirement
& Source
Total water requirement is about 3.0 KLD= 1.0 KLD (Drinking & Domestic Uses) + 0.8 KLD (Plantation) + 0.7 KLD (Dust Suppression) + 0.5 KLD (Wet Drilling). Water for Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel & Energy
Diesel will be used for transportation vehicles.
7. Application no., Date of Documents Submi
tted
Category : B2 SEAC FILE NO. : 19616 Date of documents Submitted :14/05/2021 SEAC Meeting No. :4.95thMeeting Agenda Sr. No. :34 Date of Presentation : 28/07/2021
8. Information about Aravalli certifi
cate
Aravalli Certificate has been issued byMining Engineer, Ajmervide letter No.ME/Aj/Composite/Machi/AravaliPra-/69 on dated 05/02/2021.
9. Date of Air, Water, Noise, monitoring
Monitoring was conducted byNoida Testing Laboratories., Approved by NABL, Noida.
10. Information about 500 mts composite map
500 mts composite map has been issued by Mining Engineer, Ajmervide letter No. ME/Aj/Composite/Machi/AravaliPra-/69 on dated 05/02/2021. Area falling within 500 mts8.0 Ha.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
This is an existing lease. Initially, the mining lease for mineral Quartz & Feldspar,
Area- 4.0 ha., was granted in favour of Shri Chand Mohammad S/o.- Mr. Nasiruddin by vide
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 4.0 lacs Recurring Cost: Rs. 4.0lacs per annum.
Sr.
No. Particulars Capital Cost
(in Rs. Lac) Recurring Cost (in
Rs. Lac)
1. Pollution Control i) Dust Suppression
1,95,000/- 1,95,000/-
2. Pollution Monitoring
i) Air pollution ii) Water pollution
-- 10,000/-
3. Green Belt 2,05,000/- 1,95,000/-
Total 4,00,000/- 4,00,000/-
12. Greenbelt & Plantation
Expenditure of Green Belt Rs 1,95,000/- Total green belt will be the 33% of the mine area 1.32 ha of the area shall be planted in the Part of Govt. Charahgah land at village Ramsar in khasra no.-9171. Nativespecie which are more suitable to the local environment are preferred to be planted such as like Neem (Azadiractaindica), Pipal (Ficusreligiosa), Mango (MangiferaIndica), Amla(PhyllanthusEmblica) etc. it is the proposed to invest 1.95 Lac. Rs. Per annum for greenbelt devlopment
Yea
r
Outside the lease area( Part of Govt. Charahgah
land at village Ramsar in khasra no.-9171)
Top Soil
Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st
Yea
r
0.440 440 -- -- 0.440 440
2nd
Yea
r
0.440 440 -- --
0.440 440
3rd
Yea
r
0.440 440
-- --
0.440 440
Tot
al
1.320 1320 -- -- 1.320 1320
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining operations,
undertake re-grassing the mining area and any other area which may have been disturbed due to their
mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetary breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr. No. Facility provided for Labour Capital Cost in Rs. Recurring cost in Rs.
1. Drinking water facility 10,000/- 20,000/-
2. Health Facility (First aid box, Rest shelter,
Medicine & Washroom) & Insurance 10,000/- 20,000/-
3. Education for Labour children 10,000/- 20,000/-
4. Safety equipment like Ear plug, Dust mask, hand gloves, Safety Shoes etc.
10,000/- 20,000/-
Total 40,000/- 80,000/-
14. Present Status
M.L Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
order dated 03.08.2010. The lease was registered on 22.11.2010 for 30 years. The lease
validity was auto extended for 50 years and valid up to 21.11.2060.
The project being one of major mineral (before 10.02.2015) having lease area of 4.0
ha.(less than 5.0 ha.), came under the purview of the EIA Notification dated 07.10.2014 of
the MoEF & CC. According to the certificates dated 21.05.2014, 17.07.2015, 17.08.2016 and
15.07.2021 of ME, Ajmer the production of mineral from 2013-14 (base year) to 30.06.2021
has been nil. The project, therefore, is not one of violation of the EIA Notification. The PP
has also submitted affidavit to the affect that no activity has been carried out in violation of
the EIA Notification and Common Cause Judgment pronounced by the Hon’ble Supreme
Court.
The PP has submitted application for Rambari Quartz & Feldspar Mining Project,
ML. No.- 10/2009, Area- 4.00 ha., Production capacity- 93,272 TPA (ROM), Khasra No.
124, 125, 126, 120, 117, 118, Near Vill.- Rambari, Tehsil- Nasirbad, Distt.- Ajmer(Raj.)
(Proposal No.- 211340). The project is covered under B2 category. The mining plan has been
approved by the SME, Ajmer vide letter dated 15.04.2021. ME, Ajmer in his certificate dated
05.02.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Ajmer and in
his certificate dated 25.03.2021 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
As per cluster certificate issued by ME, Ajmer on 05.02.2021, the total area of all the
mining leases in the cluster having area of 4.0 ha. ME, Ajmer in his cluster certificate dated
05.02.2021 has also mentioned that the lease area falls in Sonkhaliya Conservation Reserve.
The SEAC, however, was of the view that no such conservation reserve has been notified in
the district. The DCF, Ajmer in his certificate dated 25.03.2021 has also not mentioned about
existence of such conservation reserve in the area.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri Chand
Mohammad, for Rambari Quartz & Feldspar Mining Project, ML. No.- 10/2009, Area- 4.00
ha., Production capacity- 93,272 TPA (ROM), Khasra No. 124,125,126,120,117,118, Near
Vill.- Rambari, Tehsil- Nasirbad, Distt.- Ajmer(Raj.) (Proposal No.- 211340), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent Shri Chand Mohammad, Add.- R/o-- Near Bus Stand,
Vill.- Ramsar, Tehsil- Nasirabad, Distt.- Ajmer (Raj.) Email-
[email protected], Consultant Name:- Cognizance Research India Private
Ltd., Add.-Office GT-20, Sec 177, Noida- 201301 (U.P.)email:-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Agenda no. 35. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19625)/ 2019-20
Project Name- EC for Granite Mining Project, Plot No. 108, Area 1.50 Ha., Production
Capacity 2,00,004 TPA (ROM), Khasra No. 1473, Add.- Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal No.- 215442).
Project Proponent Name- Shri- Naresh Agarwal, Add.- Sadar Bazar, Tantoti, Distt.- Ajmer,
(Raj.), Email- [email protected].
Consultant Name- Cognizance Research India Private Ltd. Add.-
Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
S.N
o.
Particula
rs
Details/Information
1. Cat./ Item no. (in
schedule)
:
1 (a)-B2
2. Location of the
Project
Near village – Morajhari, Tehsil: Nasirabad, District: Ajmer (Rajasthan)
3. Project Details
M.L No./
Productio
n Capacity
Plot. No. : 108 Khasra No. : 1473
Area : 1.50 HECT.
Production (TPA) : 200004 TPA(ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Project
Cost
Project Cost: Rs 3.60Cr/-(in Rs.)
Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water
requirem
ent &
Source
Total water requirement is about 5.0 KLD= 1.0 KLD (Drinking & Domestic Uses)
+ 2.0 KLD (Plantation) + 2.0 KLD (Dust Suppression). 1.0 KLD Wire Saw
cutting & Wet Drilling. Water for Drinking, dust suppression and plantation will
be collected from nearby villages.
6. Fuel &
Energy Only diesel will be required to run vehicles for transportation. Electricity will be
required for drill machines which will be fulfilled by proposed DG Set.
7. Application no.,
Date of
Documents
Submitte
d
Category : B2 SEAC FILE NO. : 19625
Date of documents Submitted : 23/06/2021
SEAC Meeting No. : 4.95th Meeting Agenda Sr. No. : 35
Date of Presentation : 28/07/2021
8. Information about
Aravalli
certificate
Aravalli Certificate has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/COMP/Map/ARAVALI-/P/2020 Date 25/05/2021
9. Date of Air,
Monitoring was conducted by Noida Testing Laboratories Approved by NABL.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Water, Noise,
monitorin
g
10. Information about
500 mts
composite map
500 mts composite map has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/COMP/Map/ARAVALI-/P/2020 Date 25/05/2021
Area falling within 500 mts 1.50ha.
11. EMP
Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 14.4lacs
Recurring Cost: Rs. 14.4 lacs per annum.
SI. No. Measures Exp. Cost in Rs.
(Fixed)
Exp. Cost in Rs.
(Recurring)
1
Pollution Control
i) Dust
Suppression
ii) Road
Preparation
and
maintenance
7,00,000/- 7,00,000/-
2
Pollution Monitoring
i) Air pollution
ii) Water pollution
15,000/- 15,000/-
3 Green Belt 7,25,000/- 7,25,000/-
Total 14,40,000/- 14,40,000/-
12. Greenbelt
& Plantatio
n
Expenditure of Green Belt Rs 7,25,000/- Total green belt will be the 33% of the mine area 0.495ha of the area shall be planted in
the part of Govt. Charagah land at village Morajhari in khasra no. 23. Native specie
which are more suitable to the local environment are preferred to be planted such as like Aam ( Mangifera indica ), Imli ( Tamarindus indica ), Shisham ( Dalbergia sisso ) etc.
it is the proposed to invest 7.25Lac. Rs. Per annum for greenbelt devlopment
Year
Outside the lease area( Govt. Charagah land at
village Morajhari in
khasra no. 23)
Top Soil
Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st
Year 0.165 165 -- -- 0.165 165
2nd
Year 0.165 165
-- -- 0.165 165
3rd
Year 0.165 165
-- -- 0.165 165
Total 0.495 495 -- -- 0.495 495
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing
mining operations, undertake re-grassing the mining area and any other area which
may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc.
13. Budgetar
y breakup
for labour
The information regarding Budgetary breakup for labour has been given in PFR &
Power Point Presentation
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Granite Mining Project, Plot No. 108,
Area 1.50 Ha., Production Capacity 2,00,004 TPA (ROM), Khasra No. 1473, Add.-
Morajhari, Tehsil- Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 215442). The project is
covered under B2 category. The SME, Ajmer vide order dated 28.04.2021 has issued LoI to
the PP for mining of Granite. The mining plan has been approved by the SME, Ajmer vide
letter dated 16.06.2021. ME, Ajmer in his certificate dated 25.05.2021 has stated that the
mining lease does not fall in Aravalli hills. DCF, Ajmer and DCF, Tonk in their certificates
dated 23.07.2021 and 23.02.2021, respectively have stated that there is no Wildlife
Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine. Besides,
the PP in Form-1 has also stated that there is no WLS, National Park and Conservation
Reserve within 10 Km of the project site.
The project does not involve approval/ clearance under the Forest (Conservation)
Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there
is any Wild Life Sanctuary/ National Park within 10 Km from the project site.
According to cluster map and cluster certificate dated 25.05.2021 issued by ME,
Ajmer, there is no cluster formation in terms of Notification dated 15.01.2016 and
01.07.2016.
Resolution:
Sr.
No.
Facility to be Provided for
Laborers
Exp. Cost in
Rs.
(Fixed)
Exp. Cost in
Rs.
(Recurring)
1. Drinking water facility 1,10,000/- 1,10,000/-
2.
Health Facility (First aid box, Rest
shelter, Medicine & Washroom)
& Insurance
1,00,000/- 1,00,000/-
3. Education for Labours children 80,000/- 80,000/-
4.
Safety equipment like Ear plug,
Dust mask, hand gloves, Safety
Shoes etc.
70,000/- 70,000/-
Total 3,60,000/- 3,60,000/-
14. Present Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Naresh
Agarwal, for Granite Mining Project, Plot No. 108, Area 1.50 Ha., Production Capacity
2,00,004 TPA (ROM), Khasra No. 1473, Add.- Morajhari, Tehsil- Nasirabad, District-
Ajmer, (Raj.) (Proposal No.- 215442), with the stipulation that the PP shall abide by the
annual production scheduled specified in mining plan and that any deviation there in will
render the PP liable for legal action in accordance with Environment and Mining Laws, with
the specific and general conditions annexed at Annexure ‘A’. Name of Proponent Shri-
Naresh Agarwal, Add.- Sadar Bazar, Tantoti, Distt.- Ajmer, (Raj.), Email-
[email protected], Consultant Name:- Cognizance Research India Private
Ltd. Add.- Office GT-20, Sec 177, Noida- 201301 (U.P.) Email:-
Agenda no. 36. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(18031)/ 2019-20
Project Name- ToR/ EC for Quartz and Feldspar Mining project, M.L. No. 15/03, Mining
Lease Area 4.0 Hect., Khasra No. 8566, Proposed Capacity 80,553 TPA (ROM){
Mineral:47,817 TPA {(Quartz- 4782 TPA & feldspar 43,035 TPA), Waste- 32,736 TPA}
Near Vill.– Devipura, Tehsil- Masuda, Distt.- Ajmer, (Raj. (Proposal No. 139295).
Project Proponent Name- Shri Akhil Sharma, Add.- C-53, RIICO Housing Colony, Ajmer
Road, Tehsil - Beawar Distt.- Ajmer, (Raj.), Email. [email protected].
Consultant Name- GAURANG ENVIRONMENTAL SOLUTIONS PVT. LTD. Add.- 102,
SNG, Shri Ratna Apartment, Near Tambi Petrol Pump, Peetal Factory, Jhotwara Road,
Jaipur, (Rajasthan), Email.– [email protected].
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 28.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
This is an existing lease. LOI with respect to the mining lease was issued vide order
dated 08.04.2010 in favour of Sh. Prasann Kumar Singhvi for a period of 20 years. The lease
deed was registered on 11.03.2014. The validity of mining lease was extended for 50 years.
The lease is therefore valid from 11.03.2014 to 10.03.2064. Later on the lease was transferred
in favour of Shri Akhil Sharma vide order dated 31.07.2017.
The project being one of major mineral (before 10.02.2015) having lease area of 4.0
ha.(less than 5.0 ha.), came under the purview of the EIA Notification dated 07.10.2014 of
the MoEF & CC. The certificate dated 22.01.2020 issued by ME, Beawar shows that the PP
started mining activity without obtaining prior EC from the regulatory authority in violation
of the provisions of the EIA Notification, 2006. The certificate shows that 2680 MT of
Feldspar in the year 2014-15 and 5650 MT in the year 2015-16 was mined out without
obtaining prior EC from the regulatory authority. The project, therefore, is one of violation
of the EIA Notification.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for ToR/ EC for Quartz and Feldspar Mining
project, M.L. No. 15/03, Mining Lease Area 4.0 Hect., Khasra No. 8566, Proposed Capacity
80,553 TPA (ROM){ Mineral: 47,817 TPA {(Quartz- 4782 TPA & feldspar 43,035 TPA),
Waste- 32,736 TPA} Near Vill.– Devipura, Tehsil- Masuda, Distt.- Ajmer, (Raj. (Proposal
No. 139295). The project is covered under B2 category. The mining plan has been approved
by the SME, Ajmer vide letter dated 15.11.2019. ME, Beawar in his certificate dated
11.01.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Ajmer its
certificate dated 22.01.2020 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 11.01.2021 issued by ME, Beawar. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
The SEAC examined the project in the light of OM dated 12.11.2020 of the MoEF &
CC. This OM provides that while considering the application for EC under violation category
as per Notification dated 14.03.2017 of the MoEF & CC, the SEAC may insist upon public
hearing to be conducted only for those category of projects for which EIA Notification, 2006
itself requires public hearing to be conducted. The project, under consideration, is one of ‘B2’
category and being so does not require public hearing as per EIA Notification, 2006 read with
various OM’s and guidelines issued by the MoEF & CC, from time to time.
The SEAC, in view of the project being one of violation of the EIA notification as
also in terms of Common Cause judgment of the Hon’ble Supreme Court, decided that the PP
is required to conduct Environmental Impact Assessment Study and prepare Remediation
Plan, Natural Resource Augment Plan and Community Resource Augmentation Plan.
Keeping in view the presentation made by the PP/ Consultant and examination of
documents submitted by them, the SEAC resolved to recommend to SEIAA for prescribing
the ToR mentioned at ‘Annexure B’, as a case of violation of the EIA notification, for
preparing comprehensive EIA/EMP reports and Assessment of Ecological Damage,
preparation of Remediation Plan and Natural Community Resource Augmentation Plan as a
case of violation, of the EIA notification.
Agenda no. 37. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19626)/ 2019-20
Project Name- EC for Granite Mining Project, Plot No. 107, Area 1.3680 Ha., Production
Capacity- 2,12,100 TPA (ROM), Khasra No. 1473, Add.- Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal No.- 215473).
Project Proponent Name- Shri- Parasmal Dhabariya, Add.- Sadar Bazar, Tantoti, Distt.-
Ajmer, (Raj.), Email- [email protected].
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name- COGNIZANCE RESEARCH INDIA PRIVATE LTD. Add.- Office GT
– 20, Sec – 117, Noida (U.P.)
The particulars of the project, in brief, as submitted by the PP are as follows:
S.
No
.
Particulars Details/Information
1. Cat./ Item no. (in schedule):
1 (a)-B2
2. Location of the Project
Near village – Morajhari , Tehsil: Nasirabad , District: Ajmer (Rajasthan)
3. Project Details M.L No./ Production Capacity
ML. No. : Plot No.-107 Khasra No. : 1473 Area : 1.3680 HECT.
Production (TPA) : 212100 TPA(ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
4. Project Cost Project Cost: Rs 3.00Cr/-(in Rs.) Details are given in cover page of Proposal obtaining of Environmental Clearance
5. Water requirement & Source
Total water requirement is about 5.0 KLD = 1.0 KLD (Drinking & Domestic Uses) + 1.0 KLD (Plantation) + 1.0 KLD (Dust Suppression). 2.0 KLD Water for Drinking, dust suppression and plantation will be collected from nearby villages.
6. Fuel & Energy
No electricity will be required in mining operations as mining will be carried out in day time only. Diesel will be used for transportation vehicles.
7. Application no., Date of Documents Submitted
Category : B2 SEAC FILE NO. : 19626 Date of documents Submitted : 24/06/2021 SEAC Meeting No. : 4.95nd Meeting Agenda Sr. No. : 37 Date of Presentation : 29/07/2021
8. Information about Aravalli certificate
Aravalli Certificate has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/Comp/Map/Aravali /p-/217 dated 25/05/2021.
9. Date of Air, Water, Noise,
monitoring
Monitoring was conducted by Noida Testing Laboratories. Approved by NABL.
10. Information about 500 mts composite map
500 mts composite map has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/Comp/Map/Aravali /p-/217 dated 25/05/2021. Area falling within 500 mts 1.3680ha.
11. EMP Activities
Environment Management Plan Expenditures: Capital Cost: Rs. 12.0 lacs Recurring Cost: Rs. 12.0 lacs per annum.
Sr.
No. Particulars Capital Cost
(in Rs. Lac) Recurring Cost
(in Rs. Lac)
1. Pollution Control i) Dust Suppression ii) Road Preparation And
Maintenance
6,00,000 6,00,000
2. Pollution Monitoring i) Air pollution ii) Water pollution
- 15,000/-
3. Green Belt 6,00,000 5,85,000
Total 12,00,000/- 12,00,000/-
12. Greenbelt & Plantation
Expenditure of Green Belt Rs 5,85,000/- Total green belt will be the 33% of the mine area 0.450ha of the area shall be in the part of Govt. Charagah land at village Morajhari in Khasra No.-23. Native specie which are more suitable to the local environment are preferred to be planted such as like Peepal (Ficus Religiosa),
Shisham(Dalbergia sissoo), Apple (Malus Domestica) Mango (Mangifera indica), etc. it is the proposed to invest 1.25 Lac. Rs. Per annum for greenbelt devlopment
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has applied for EC for Granite Mining Project, Plot No. 107, Area 1.3680
Ha., Production Capacity- 2,12,100 TPA (ROM), Khasra No. 1473, Add.- Morajhari, Tehsil-
Nasirabad, District- Ajmer, (Raj.) (Proposal No.- 215473). The project is covered under B2
category. The SME, Ajmer vide order dated 28.04.2021 has issued LoI to the PP for mining
of Granite. The mining plan has been approved by the SME, Ajmer vide letter dated
16.06.2021. ME, Ajmer in his certificate dated 25.05.2021 has stated that the mining lease
does not fall in Aravalli hills. DCF, Ajmer and DCF, Tonk in their certificates dated
23.07.2021 and 23.02.2021 have stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. Besides, the PP in Form-1 has
also stated that there is no WLS, National Park and Conservation Reserve within 10 Km of
the project site.
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
Year
Outside the lease area ( part of
Govt. Charagah land at village
Morajhari in Khasra No.-23)
Top Soil Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees Area (Ha.) No. of Trees
1st Year 0.150 150 -- -- 0.150 150
2nd Year 0.150 150 -- -- 0.150 150
3rd Year 0.150 150 -- -- 0.150 150
Total 0.450 Hect. 450 -- -- 0.450 Hect. 450
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for growth
of fodder, flora, fauna etc.
13. Budgetary breakup for labour
The information regarding Budgetary breakup for labour has been given in PFR & Power Point Presentation
Sr.
No. Facility provided for Labour Capital Cost in
Rs. Recurring cost in
Rs.
1. Drinking water facility 1,00,000/- 1,00,000/-
2. Health Facility (First aid box, Rest shelter, Medicine & Washroom) & Insurance
1,00,000/- 1,00,000/-
3. Education for Labour children 50,000/- 50,000/-
4. Safety equipment like Ear plug, Dust
mask, hand gloves, Safety Shoes etc. 50,000/- 50,000/-
Total 3,00,000/- 3,00,000/-
14. Present Status
LOI Granted
Final minutes of 4.95th meeting held on 27-29 July, 2021
According to cluster certificate and map dated 25.05.2021 issued by ME, Ajmer, in
terms of Notifications MoEF & CC dated 15.01.2016 and 01.07.2016, there is no cluster
formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1, Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Parasmal Dhabariya, for Granite Mining Project, Plot No. 107, Area 1.3680 Ha., Production
Capacity- 2,12,100 TPA (ROM), Khasra No. 1473, Add.- Morajhari, Tehsil- Nasirabad,
District- Ajmer, (Raj.) (Proposal No.- 215473), with the stipulation that the PP shall abide
by the annual production scheduled specified in mining plan and that any deviation there in
will render the PP liable for legal action in accordance with Environment and Mining Laws,
with the specific and general conditions annexed at Annexure ‘A’. Name of Proponent Shri-
Parasmal Dhabariya, Add.- Sadar Bazar, Tantoti, Distt.- Ajmer, (Raj.), Email-
[email protected], Consultant Name:- COGNIZANCE RESEARCH
INDIA PRIVATE LTD. Add.- Office GT – 20, Sec – 117, Noida (U.P.).
Agenda no. 38. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19627)/ 2019-20
Project Name- EC for Granite Mining Project, M.L. No. 02/2021, Plot No.38, Area 1.5968
Ha., Production Capacity-1,59,999 TPA (ROM), Khasra No.- 1419/989, Add.- Nallu, Tehsil-
Kishangarh, District- Ajmer, (Raj.) (Proposal No.- 214716).
Project Proponent Name M/s Stone Tech Granites, (Project in Charge) Shri- Jayram
Buldak S/o Shri- Mohan Ram, Add.- Kh.No. 421/2, Khatoli, Tehsil- Kishangarh, Distt.-
Ajmer, (Raj.), [email protected].
Consultant Name- Cognizance Research India Private Ltd.(Accredited by NABET, Govt. of
India Accredited No. NABET/EIA/1619/IA006, Valid up to Aug 18, 2019)Office GT-20, Sec
177, Noida- 201301 (U.P.)email:- [email protected]
The particulars of the project, in brief, as submitted by the PP are as follows:
S.
No
.
Partic
ulars
Details/Information
1. Cat./
Item
no. (in
schedu
le):
1 (a)-B2
2. Locati
on of
the
Project
Near village – Nallu, Tehsil:- Kishangarh, District- Ajmer, , (Rajasthan)
3. Project
Details
M.L
No./ Produc
tion
Plot No. : 38, M.L.No. 02/2021,
Khasra No. : 1419/989
Area : 1.5968 Ha.
Production (TPA) : 159999TPA (ROM)
Details are given in cover page of Proposal obtaining of Environmental Clearance
(Slides No.: 1)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Capaci
ty
4. Project
Cost
Project Cost: Rs 1.30 Cr.
Details are given in cover page of Proposal obtaining of Environmental Clearance
(Slides No.: 1)
5. Water
requirement
&
Source
Total water requirement is about 4.5 KLD= 2.0 KLD (Drinking & Domestic Uses) + 1.0 KLD
(Plantation) + 1.0 KLD (Dust Suppression) 0.5 KLD (Wire saw Cutting). Water for Drinking, dust suppression and plantation will be collected from nearby villages.
Details are given in Slide no. 30 of Power Point Presentation.
6. Fuel &
Energy
No electricity will be required in mining operations as mining will be carried out in day time
only.
7. Applic
ation
no.,
Date
of
Docu
ments
Submitted
Category : B2
SEAC FILE NO. : 19627
Date of documents Submitted : 23/6/2021
SEAC Meeting No. : 4.95rd Meeting
Agenda Sr. No. : 38
Date of Presentation : 28/07/2021
8. Inform
ation
about
Araval
li
certific
ate
Aravalli Certificate has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/Comp/Map/Aravalli P-/258 Date - 17/06/2021as Slide No.. 12
9. Date
of Air,
Water,
Noise,
monitoring
Monitoring was conducted by Noida Testing Laboratories., Approved by NABL, Noida as Slide
No.: 33-34
10. Informa
tion
about
500 mts
composi
te map
500 mts composite map has been issued by Mining Engineer, Ajmer vide letter No. ME/AJ/Comp/Map/Aravalli P-/258 Date - 17/06/2021as Slide No..: 13 Area falling within 500 mts 1.5968 Ha.
11. CER
Activit
ies
Environment Management Plan Expenditures: Capital Cost: Rs. 6,50,000/- Recurring Cost: Rs.
6,50,000/- per annum.
SI. No. Measures Exp. Cost in Rs.
(Fixed Yearly)
Exp. Cost in Rs.
( Recurring
Yearly)
1
Pollution Control
i) Dust Suppression & Wet Drilling
3,10,000/- 3,10,000/-
2 Pollution Monitoring i) Air pollution
ii) Water pollution
--- 15,000
3 Green Belt 3,40,000/- 3,25,000/-
Total 6,50,000/- 6,50,000/-
12. Green
belt & Plantat
ion
Expenditure of Green Belt Rs 3,25,000/-
Total green belt will be the 33% of the lease area 0.526 Ha. of the area will be planted in the part of govt. charagah land at village Nallu in Khasra no.- 1015.
Native specie which are more suitable to the local environment are preferred to be planted such
Final minutes of 4.95th meeting held on 27-29 July, 2021
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Granite Mining Project, M.L.No.
02/2021, Plot No.38, Area 1.5968 Ha., Production Capacity- 1,59,999 TPA (ROM), Khasra
No.- 1419/989, Add.- Nallu, Tehsil- Kishangarh, District- Ajmer, (Raj.) (Proposal No.-
214716). The project is covered under B2 category. The SME, Ajmer vide order dated
26.03.2021 has issued LoI to the PP for mining of Granite. The mining plan has been
approved by the SME, Ajmer vide letter dated 02.06.2021. ME, Ajmer in his certificate dated
17.06.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Ajmer in his
certificate dated 22.07.2021 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
as like Aam (Mangifera indica), Imli(Tamarindus indica), Neem (Azadirachta Indica), Shisham
(Dalbergia sisso) etc. it is the proposed to invest 3.25Lac. Rs. Per annum for greenbelt
devlopment
Year
Outside the lease area ( charagah land at
village Nallu in Khasra no.- 1015)
Top Soil
Dumps Total
Area (Ha.) No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
1st
Year 0.175 175 -- -- 0.175 175
2nd
Year 0.175 175 -- -- 0.175 175
3rd
Year 0.176 176 -- -- 0.176 176
Tota
l 0.526 526 -- --
0.526 526
Note:- As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining
operations, undertake re-grassing the mining area and any other area which may have been
disturbed due to their mining activities and restore the land to a condition which is fit for
growth of fodder, flora, fauna etc.
13. Budget
ary
breakup for
labour
The information regarding Budgetary breakup for labour has been given in Power Point
Presentation (Slide No.: 17)
Sr.
No.
Facility to be Provided for
Laborers
Exp. Cost in Rs.
(Fixed Yearly)
Exp. Cost in Rs.
( Recurring Yearly)
1. Drinking water facility 50,000/- 50,000/-
2.
Health Facility (First aid box,
Rest shelter, Medicine &
Washroom) & Insurance
50,000/- 50,000/-
3. Education for Labours children 20,000/- 20,000/-
4.
Safety equipment like Ear plug,
Dust mask, hand gloves, Safety
Shoes etc.
10,000/- 10,000/-
Total 1,30,000/- 1,30,000/-
14. Presen
t Status
Proposed Mine site.
Final minutes of 4.95th meeting held on 27-29 July, 2021
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
According to cluster certificate and map dated 17.06.2021 issued by ME, Ajmer, in
terms of Notifications MoEF & CC dated 15.01.2016 and 01.07.2016, there is no cluster
formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Stone
Tech Granites, (Project in Charge) Shri- Jayram Buldak S/o Shri- Mohan Ram, for Granite
Mining Project, M.L.No. 02/2021, Plot No.38, Area 1.5968 Ha., Production Capacity-
1,59,999 TPA (ROM), Khasra No.- 1419/989, Add.- Nallu, Tehsil- Kishangarh, District-
Ajmer, (Raj.) (Proposal No.- 214716), with the stipulation that the PP shall abide by the
annual production scheduled specified in mining plan and that any deviation there in will
render the PP liable for legal action in accordance with Environment and Mining Laws, with
the specific and general conditions annexed at Annexure ‘A’. Name of Proponent M/s Stone
Tech Granites, (Project in Charge) Shri- Jayram Buldak S/o Shri- Mohan Ram, Add.-
Kh.No. 421/2, Khatoli, Tehsil- Kishangarh, Distt.- Ajmer, (Raj.), Email-
[email protected], Consultant Name:- Cognizance Research India Private
Ltd.(Accredited by NABET, Govt. of India Accredited No. NABET/EIA/1619/IA006, Valid
up to Aug 18, 2019)Office GT-20, Sec 177, Noida- 201301 (U.P.), email:-
Agenda no. 39. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19582)/ 2019-20
Project Name- Environmental Clearance for Juni Aati Masonry Stone Mining Project, Plot
No.- 103, Area- 1.00 ha., Production Capacity- 1,43,650TPA (ROM) Khasra No.- 579/321
Near Vill.- Juni Aati, Tehsil & Distt.- Barmer (Raj).(Proposal No.-214172).
Project Proponent Name- M/s Tan Singh Chouhan, Add.- R/o- Gandhi Nagar, Tehsil &
Distt.- Barmer (Raj.) Email- [email protected].
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected]
The particulars of the project, in brief, as submitted by the PP are as follows:
1 Category /Item No.(In Schedule): 1(a) B2
2 Location of Project “Juni Aati Masonary Stone Plot Area, Plot. No103.-, located
at Near Village – Juni Aati
Tehsil – Barmer, District – Barmer,(Rajasthan)
3 Project Details ML. No. / Production Capacity Plot. No 103.Applied Area–1.00Hect. (Govt waste Land)
Khasra No. 579/321 , Proposed Production Capacity-
143650TPA (ROM)
4 Project Cost: 30.0Lacs
5 Water Requirement & Source: 3.0KLD
Final minutes of 4.95th meeting held on 27-29 July, 2021
6 Fuel & Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document Submitted:- Proposal No (214172)
8 Information About Aravalli Certificate. Aravalli letter was issued by ME BR vide letter no. ME/ BR
/ environment/Aravli/2021/207 on dated 28-/05/2021
9 Date of Air/Water/Noise/Monitoring Nodia Testing Laboratories 3/06/2021
10 Information About 500 mts Composite Map 500 M Map was issued by ME BR vide letter no. ME/ BR /
EC/DRG/2021/473 on dated 28-/05/2021
11 Environment Management Plan EMP Cost :- Capital Cost is 1.15,000 Lac
Recurring cost is 85,000 Lac per years.
S. No. Particulars Capital Cost in RS. Recurring cost in Rs.
per years
1 Pollution control ( water
sprinkling for dust
suppression )
-- 20,000
2 Pollution monitoring (Air.
Water ,Noise, Soil) -- 15,000
3 Greenbelt Sr.
No
Particulars Amount
1 Plant 330 20,000
2 Tree guard 330 20,000
3 Water Tanker 10,000
4 Maintains & security 10,000
Total 60,000
25,000
4 Occupation health 20,000/- 10,000
5 Miscellaneous (Fencing, etc.) 35,000/- 15,000
Total 1,15,000/- 85,000/-
12 Green Belt/ Plantation 0.60 Lac
Places of Plantation:- About 330 saplings will be planted in an area of 0.33 ha (33% of applied area) upto the end
of 5 years, About 330 Sapling will be planted out side the lease boundary at own khatedari land Khasra No
586/95.
Year Along the lease
boundary
On Backfilled
area
Outside the lease
area
Top Soil Dumps Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Trees
2021-22 -- -- -- -- 0.066 66 -- -- 0.066 66
2022-23 -- -- -- -- 0.066 66
-- -- 0.066 66
2023-24 -- -- -- -- 0.066 66
-- -- 0.066 66
2024-25 -- -- -- -- 0.066 66 -- -- 0.066 66
2025-26 -- -- -- --
0.066 66
-- -- 0.066 66
Total -- -- -- --
0.330 330
-- -- 0.330 330
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
13 Budgetary Breakup For Labor Labor Welfare Capital Cost is 0.60 Lac, and
Recurring Cost is 0.30 lac.
S. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In
RS. Per Year
1. Drinking water provided by Tanker 20,000/- 10,000/-
2. First Aid Box 5,000/- 2,000/-
3. Rest Shelter 8,000/- 4,000/-
4. Washroom Facilities for laborers 12,000/- 6,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear plugs,
Helmet 10,000/- 8,000/-
6 Insurance 5,000/- --
Final minutes of 4.95th meeting held on 27-29 July, 2021
Total 60,000/- 30,000/-
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Juni Aati Masonry
Stone Mining Project, Plot No.- 103, Area- 1.00 ha., Production Capacity- 1,43,650TPA
(ROM) Khasra No.- 579/321 Near Vill.- Juni Aati, Tehsil & Distt.- Barmer (Raj).(Proposal
No.-214172). The project is covered under B2 category. The SME, Jodhpur vide order dated
07.01.2021 has issued LoI to the PP for mining of Masonry Stone. The mining plan has been
approved by the SME, Jodhpur vide letter dated 18.05.2021. ME, Barmer in his certificate
dated 28.05.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Barmer
in its certificate dated 21.09.2020 has stated that there is no Wildlife Sanctuary/National
Park/ Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 28.05.2021 issued by ME, Barmer. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Tan
Singh Chouhan, for Juni Aati Masonry Stone Mining Project, Plot No.- 103, Area- 1.00 ha.,
Production Capacity- 1,43,650 TPA (ROM), Khasra No.- 579/321 Near Vill.- Juni Aati,
Tehsil & Distt.- Barmer (Raj).(Proposal No.-214172), with the stipulation that the PP shall
abide by the annual production scheduled specified in mining plan and that any deviation
there in will render the PP liable for legal action in accordance with Environment and Mining
Laws, with the specific and general conditions annexed at Annexure ‘A’. Name of
Proponent M/s Tan Singh Chouhan, Add.- R/o- Gandhi Nagar,Tehsil & Distt.- Barmer
(Raj.)[email protected], Consultant Name:- M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarovar- Jaipur- (Raj.)
Email- [email protected].
Agenda no. 40. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19583)/ 2019-20
Project Name- Environmental Clearance for Sodhon ki Dhani Masonry Stone Mining
Project Ref. No.- 20201000022559, Area- 2.00 ha., Production Capacity- 2,65,625 TPA
Final minutes of 4.95th meeting held on 27-29 July, 2021
(ROM), Khasra No.- 947/95, Near Vill.- Sodhon Ki Dhani, Tehsil & Distt.- Barmer (Raj.),
(Proposal No.-214348).
Project Proponent Name: M/s Tan Singh Chouhan, Add.- R/o- Gandhi Nagar, Tehsil &
Distt.- Barmer (Raj.), [email protected].
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected]
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /Item No.(In Schedule): 1(a) B2
2 Location of Project “Sodhon Ki DhaniMasonary Stone Mine, Ref No
20201000022559.,Near Village – Sodhon Ki
Dhani Tehsil – Barmer, District – Barmer,
(Rajasthan)
3 Project Details ML. No. / Production Capacity Ref No 20201000022559.Applied Area–2.00Hect.
(Khatedari Land) Khasra No. 947/95 , Proposed
Production Capacity- 265625 TPA (ROM)
4 Project Cost: 50.0Lacs
5 Water Requirement & Source: 3.0KLD
6 Fuel & Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document
Submitted:-
Proposal No (214348)
8 Information About Aravalli Certificate. Aravalli letter was issued by ME BR vide letter no.
ME/ BR / environment/Aravli/2021/203 on dated 28-
/05/2021
9 Date of Air/Water/Noise/Monitoring Nodia Testing Laboratories 3/06/2021
10 Information About 500 mts Composite Map 500 M Map was issued byME BR/vide letter no. ME/
BR / EC/DRG/2021/475on dated 28-/05/2021
11 Environment Management Plan EMP Cost :- Capital Cost is 1,25,000 Lac
Recurring cost is 90,000 Lac per years.
S. No. Particulars Capital Cost in RS. Recurring cost in
Rs. per years 1 Pollution control (
water sprinkling for
dust suppression )
-- 20,000
2 Pollution monitoring
(Air. Water ,Noise,
Soil)
-- 15,000
3 Greenbelt Sr.
No
Particulars Amount
1 Plant 660 30,000
2 Tree guard 660 20,000
3 Water Tanker 5,000
4 Maintains &
security
10,000
Total 65,000
25,000
4 Occupation health 25,000 15,000
5 Miscellaneous
(Fencing, etc.) 35,000 15,000
Total 1.25,000 90,000
12 Green Belt/ Plantation 0.65 Lac Places of Plantation:- About 660 saplings will be planted in an area of 0.66 ha (33% of applied area)
Final minutes of 4.95th meeting held on 27-29 July, 2021
upto the end of 5years,About 660 sapling will be planted out side the lease boundary at own khatedari
land Khasra No 586/95.
Year Along the lease
boundary
On Backfilled
area
Outside the
lease area
Top Soil Dumps Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees Trees
2021-22 -- -- -- -- 0.132 132 -- -- 0.132 132
2022-23 -- -- -- -- 0.132 132 -- -- 0.132 132
2023-24 -- -- -- --
0.132 132 -- -- 0.132 132
2024-25 -- -- -- -- 0.132 132 -- -- 0.132 132
2025-26 -- -- -- -- 0.132 132 -- -- 0.132 132
Total -- -- -- --
0.660 660
-- -- 0.660 660
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
13 Budgetary Breakup For Labor Labor Welfare Capital Cost is 0.60 Lac,
and Recurring Cost is 0.30 lac.
S. No. Facility Provided for Laborers Capital Cost in
RS.
Recurring
Cost In RS.
Per Year
1. Drinking water provided by Tanker 20,000/- 10,000/-
2. First Aid Box 5,000/- 2,000/-
3. Rest Shelter 8,000/- 4,000/-
4. Washroom Facilities for laborers 12,000/- 6,000/-
5 Safety Shoes, hand gloves, Dust
mask, Ear plugs, Helmet 10,000/- 8,000/-
6 Insurance 5,000/- --
Total 60,000/- 30,000/-
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has applied for Environmental Clearance for Sodhon ki Dhani Masonry Stone
Mining Project Ref. No.- 20201000022559, Area- 2.00 ha., Production Capacity- 2,65,625
TPA (ROM), Khasra No.- 947/95, Near Vill.- Sodhon Ki Dhani, Tehsil & Distt.- Barmer
(Raj.), (Proposal No.-214348). The project is covered under B2 category. The SME, Jodhpur
vide order dated 24.12.2020 has issued LoI to the PP for mining of Masonry Stone. The
mining plan has been approved by the SME, Jodhpur vide letter dated 12.05.2021. ME,
Barmer in his certificate dated 28.05.2021 has stated that the mining lease does not fall in
Aravalli hills. DCF, Barmer in its certificate dated 16.10.2020 has stated that there is no
Final minutes of 4.95th meeting held on 27-29 July, 2021
Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine
and the nearest forest land is at a distance of 0.25 Km from the applied lease area. The project
does not involve approval/ clearance under the Forest (Conservation) Act, 1980 and Wild
Life Protection Act, 1972 as no forest land is involved and neither there is any Wild Life
Sanctuary/ National Park within 10 Km from the project site.
As per cluster certificate issued by ME, Barmer on 28.05.2021, the total area of all the
mining leases in the cluster having area of 4.90 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation resolved to recommend to SEIAA for grant of EC to M/s Tan Singh
Chouhan, for Sodhon ki Dhani Masonry Stone Mining Project, Ref. No.- 20201000022559,
Area- 2.00 ha., Production Capacity- 2,65,625 TPA (ROM), Khasra No.- 947/95, Near Vill.-
Sodhon Ki Dhani, Tehsil & Distt.- Barmer (Raj.) (Proposal No.-214348), with the stipulation
that the PP shall abide by the annual production scheduled specified in mining plan and that
any deviation there in will render the PP liable for legal action in accordance with
Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent M/s Tan Singh Chouhan, Add.- R/o- Gandhi
Nagar,Tehsil & Distt.- Barmer (Raj.) Email- [email protected],
Consultant Name:- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Agenda no. 41. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19586)/ 2019-20
Project Name- Environmental Clearance for Bapcha Masonry Stone Mine, Ref. No.-
20191000014037, area- 1.1612 ha., Production Capacity- 2,00,000 TPA (ROM), Khasra No.-
444 & 445, Near Vill.- Bapcha, Tehsil- Chhabra, Distt.- Baran (Raj) (Proposal No.-207963).
Project Proponent Name- Smt. Anita Bagdi W/o Sh. Satyendra Maheshwari, Add.- R/o- A-
9-10, Shastri Nagar, Ward No.-02, Hill View Colony, Chhabra, Distt.- Baran (Raj.) Email-
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected]
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Bapcha Masonry
Stone Mine, Ref. No.- 20191000014037, area- 1.1612 ha., Production Capacity- 2,00,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
TPA (ROM), Khasra No.- 444 & 445, Near Vill.- Bapcha, Tehsil- Chhabra, Distt.- Baran
(Raj) (Proposal No.-207963). The project is covered under B2 category. The SME, Kota vide
order dated 23.10.2020 has issued LoI to the PP for mining of Masonry Stone .The mining
plan has been approved by the SME, Kota vide letter dated 25.03.2021. AME, Baran in his
certificate dated 05.11.2020 has stated that the mining lease does not fall in Aravalli hills.
According to cluster certificate and map dated 05.11.2020 issued by AME, Baran, in
terms of Notifications of the MOEF & CC dated 15.01.2016 and 01.07.2016, there is no
cluster formation.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Agenda no. 42. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19587)/ 2019-20
Project Name- Environmental Clearance for Ganerav Granite Mining Project, Ref. No.-
20191000010415,area-1.1519 ha,Production Capacity - 65850 TPA (ROM), Khasra No.-
4296/196, Near Vill.- Ganerav, Tehsil- Desuri, Distt.- Pali (Raj).(Proposal No.-209034)
Project Proponent Name- Shri Chandra Prakash Salvi, Add.- R/o- Salviyon Ka Mohlla,
Biyanan Post Tikad, Tehsil- Devgarh, Distt.- Pali (Raj.) Email-
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected].
Observations and Resolution of the committee:-
The PP vide letter dated 29.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 43. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19588)/ 2019-20
Project Name- Environmental Clearance for Juni Aati Masonry Stone Mining Project, Plot
No.- 98, Area- 1.50 ha., Production Capacity- 2,43,750 TPA (ROM), Khasra No.- 579/321
Near Vill.- Juni Aati, Tehsil & Distt.- Barmer (Raj).(Proposal No.-213961).
Project Proponent Name- M/s Tan Singh Chouhan, Add.- R/o- Gandhi Nagar, Tehsil &
Distt.- Barmer (Raj.) Email- [email protected]
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected]
The particulars of the project, in brief, as submitted by the PP are as follows:
Final minutes of 4.95th meeting held on 27-29 July, 2021
1. Category /Item No.(In Schedule): 1(a) B2
2 Location of Project -:- “Juni Aati Masonary Stone Plot Area, Plot. No98.-,
located at Near Village – Juni Aati
Tehsil – Barmer, District – Barmer,
(Rajasthan)
3 Project Details ML. No. / Production Capacity Plot. No98. Applied Area–1.50 Hect. (Govt Landi Land)
Khasra No. 579/321 , Proposed Production Capacity-
243750TPA (ROM)
4 Project Cost: 40.0 Lacs
5 Water Requirement & Source: 3.0KLD
6 Fuel & Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document Submitted:- Proposal No (213961)
8 Information About Aravalli Certificate. Aravalli letter was issued by ME BR vide letter no. ME/ BR
/ environment/Aravli/2021/205 on dated 28-/05/2021
9 Date of Air/Water/Noise/Monitoring Nodia Testing Laboratories 3/06/2021
10 Information About 500 mts Composite Map 500 M Map was issued by ME BR vide letter no. ME/ BR /
EC/DRG/2021/474 on dated 28-/05/2021
11 Environment Management Plan EMP Cost :- Capital Cost is 1.20,000 Lac
Recurring cost is 80,000 Lac per years.
S. No. Particulars Capital Cost in RS. Recurring cost in Rs.
per years
1 Pollution control ( water
sprinkling for dust
suppression )
-- 20,000
2 Pollution monitoring
(Air. Water ,Noise, Soil) -- 15,000
3 Greenbelt Sr.
No
Particulars Amount
1 Plant 490 20,000
2 Tree guard 490 20,000
3 Water Tanker 10,000
4 Maintains &
security
10,000
Total 60,000
20,000
4 Occupation health 25,000/- 10,000
5 Miscellaneous (Fencing,
etc.) 35,000/- 15,000
Total 1,20,000/- 80,000/-
12 Green Belt/ Plantation 0.60 Lac
Places of Plantation:- About 490 saplings will be planted in an area of 0.49 ha (33% of applied area) upto the end
of 5years, About 490 Sapling will be planted out side the lease boundary at own khatedari land Khasra No 586/95.
Year Along the lease
boundary
On Backfilled area Outside the lease
area
Top Soil Dumps Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area (Ha.) No. of
Trees
Trees
2021-22 -- -- -- --
0.098 98 -- -- 0.098 98
2022-23 -- -- -- --
0.098 98 -- -- 0.098 98
2023-24 -- -- -- --
0.098 98 -- -- 0.098 98
2024-25 -- -- -- -- 0.098 98 -- -- 0.098 98
2025-26 -- -- -- --
0.098 98 -- -- 0.098 98
Total -- -- -- --
0.490 490
-- -- 0.490 490
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
Final minutes of 4.95th meeting held on 27-29 July, 2021
13 Budgetary Breakup For Labor Labor Welfare Capital Cost is 0.50 Lac, and
Recurring Cost is 0.20 lac.
S. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In
RS. Per Year
1. Drinking water provided by Tanker 15,000/- 8,000/-
2. First Aid Box 5,000/- 2,000/-
3. Rest Shelter 8,000/- 3,000/-
4. Washroom Facilities for laborers 9,000/- 4,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear plugs,
Helmet 8,000/- 3,000/-
6 Insurance 5,000/- --
Total 50,000/- 20,000/-
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Juni Aati Masonry
Stone Mining Project, Plot No.- 98, Area- 1.50 ha., Production Capacity- 2,43,750 TPA
(ROM), Khasra No.- 579/321 Near Vill.- Juni Aati, Tehsil & Distt.- Barmer (Raj) (Proposal
No.-213961). The project is covered under B2 category. The SME, Jodhpur vide order dated
07.01.2021 has issued LoI to the PP for mining of Masonry Stone. The mining plan has been
approved by the SME, Jodhpur vide letter dated 18.05.2021. ME, Barmer in his certificate
dated 28.05.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Barmer
in its certificate dated 21.09.2020 has stated that there is no Wildlife Sanctuary/National
Park/ Conservation Reserve within 10 km periphery of the mine and the forest land is at a
distance of 5.0 Km from the applied lease area.
The project does not involve approval/ clearance under the Forest (Conservation) Act,
1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any
Wild Life Sanctuary/ National Park within 10 Km from the project site.
The SEAC considered the certificate dated 28.05.2021 issued by ME, Barmer. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Tan
Singh Chouhan, for Juni Aati Masonry Stone Mining Project, Plot No.- 98, Area- 1.50 ha.,
Production Capacity- 2,43,750 TPA (ROM), Khasra No.- 579/321, Near Vill.- Juni Aati,
Tehsil & Distt.- Barmer (Raj).(Proposal No.-213961), with the stipulation that the PP shall
abide by the annual production scheduled specified in mining plan and that any deviation
there in will render the PP liable for legal action in accordance with Environment and Mining
Final minutes of 4.95th meeting held on 27-29 July, 2021
Laws, with the specific and general conditions annexed at Annexure ‘A’. Name of
Proponent M/s Tan Singh Chouhan, Add.- R/o- Gandhi Nagar, Tehsil & Distt.- Barmer
(Raj.) [email protected], Consultant Name:-. M/s. N.S. Enviro-Tech
Laboratories & Consultant, Add.- Plot No.-51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Email- [email protected].
Agenda no. 44. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19601)/ 2019-20
Project Name- EC for Ghatiyali Granite Mining Project, Ref. No. 20201000026666, Area
1.0198 Ha., Production Capacity- 1,01,002, TPA (RoM), Khasra No.1072/854, Add.-
Ghatiyali, Tehsil- Phagi, District- Jaipur, (Raj.) (Proposal No.- 209139).
Project Proponent Name Shri- Prakash Ranwa S/o Shri- Rameshwar Lal, Add.- Ranwa
House, Choudhary Charan Singh Nagar, Navalgarh Road, Ward No. 41, Distt- Sikar, (Raj.)
(Co-Applicant), Shri- Rameshwar Lal Choudhary S/o Shri- Tulsi Ram Choudhary, Add.-
Sikar Marg, Kadva Complex Kuchaman City, Nagaur, Distt.- Nagaur, (Raj.) Email-
Consultant Name- M/s. N.S. Envro- Tech Laboratories & Consultant, , Add- Plot No. 51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road, Mansarovar, Jaipur (Raj.).
Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1 Category /Item No.(In Schedule): 1(a) B2
2 Location of Project Ghatiyali Granite Mining Project, Ref .No-
20201000026666, of Mineral Granite, N/v-
Ghatiyali, Tehsil- Phagi District- Jaipur,
Rajasthan 3 Project Details ML. No. / Production
Capacity Khasra No.1072/854 Applied Area- 1.0198
Ha. Production Capacity- 101002 TPA
(RoM) 4 Project Cost: 90.0 Lacs
5 Water Requirement & Source: 4.5 KLD
6 Fuel & Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document
Submitted:-
Proposal No: SIA/RJ/MIN/209139/2021,
8 Information About Aravalli Certificate. Aravalli letter was issued by ME Jaipur vide
letter no. ME
Jaipur/Environment/Cluster/2020-21/1101 on
dated 07/04/2021
9 Date of Air/Water/Noise/Monitoring 03/06/2021
10 Information About 500 mts Composite Map Aravalli letter was issued by ME Jaipur vide
letter no. ME Jaipur/Environment /Cluster
/2020-21/1101 on dated 07/04/2021
11 Environment Management Plan EMP Cost :- Capital Cost is 2,90,000 Lac
Recurring cost is 2,40,000 Lac per years.
S. No. Particulars Proposed Capital cost in Rs/
Annum
1 Pollution control ( water 60,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
sprinkling for dust
suppression )
2 Pollution monitoring (Air.
Water ,Noise, Soil) 50,000
3 Greenbelt
Sr.
No
Particulars Amount
1 Plant330 30,000
2 Tree
guard330
30,000
3 Water
Tanker
25,000
4 Maintains &
security
25,000
Total 1,10,000
65,000
4 Occupation health 80,000/- 35,000 5 Miscellaneous (Fencing, etc.) 90,000/- 30,000 Total 2,90,000/- 2,40,000
12 Green Belt/ Plantation 1.10Lac
Places of Plantation:- About 330saplings will be planted in an area of 0.33 ha (33% of applied area)
upto the end of 5years, About 330 sapling will be planted along the lease boundary own khatedari
land.
Year Along the lease
boundary
On
Backfilled
area
Outside the
lease area
Top Soil
Dumps
Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees Trees
2021-22 0.066 66 -- -- -- -- -- -- 0.066 66
2022-23 0.066 66 -- --
-- -- -- -- 0.066 66
2023-24 0.066 66 -- --
-- -- -- -- 0.066 66
2024-25 0.066 66 -- -- -- -- -- -- 0.066 66
2025-26 0.066 66 -- -- -- -- -- -- 0.066 66
Total 0.330 330 -- --
-- -- -- -- 0.330 330
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
13 Budgetary Breakup For Labor Labor Capital Cost in RS. 0.90 Lac &
Recurring Cost In RS. Per Year 0.60 Lac.
S. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In RS.
Per Year
1. Drinking water provided by Tanker 30,000/- 30,000/-
2. First Aid Box 5,000/- 4,000/-
3. Rest Shelter 10,000/- 6000/-
4. Washroom Facilities for laborers 15,000/- 5,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear plugs,
Helmet 20,000/- 15,000/-
6 Insurance 10,000/- --
Final minutes of 4.95th meeting held on 27-29 July, 2021
Total 90,000/- 60,000/-
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Ghatiyali Granite Mining Project, Ref.
No. 20201000026666, Area 1.0198 Ha., Production Capacity- 1,01,002, TPA (RoM), Khasra
No.1072/854, Add.- Ghatiyali, Tehsil- Phagi, District- Jaipur, (Raj.) (Proposal No.-
209139). The project is covered under B2 category. The SME, Jaipur vide order dated
09.03.2021 has issued LoI to the PP for mining of Granite. The mining plan has been
approved by the SME, Jaipur vide letter dated 08.04.2021. ME, Jaipur in his certificate dated
29.04.2021 has stated that the mining lease does not fall in Aravalli hills. DCF, Jaipur in its
certificate dated 03.03.2021 has stated that there is no Wildlife Sanctuary/National Park/
Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 29.04.2021 issued by ME, Jaipur. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Prakash
Ranwa S/o Shri- Rameshwar Lal, (Co-Applicant) Shri- Rameshwar Lal Choudhary S/o
Shri- Tulsi Ram Choudhary for Ghatiyali Granite Mining Project, Ref. No.
20201000026666, Area 1.0198 Ha., Production Capacity - 1,01,002 TPA (RoM), Khasra No.
1072/854, Add.- Ghatiyali, Tehsil- Phagi, District- Jaipur, (Raj.) (Proposal No.- 209139)
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent Shri- Prakash Ranwa S/o Shri- Rameshwar
Lal, Add.- Ranwa House, Choudhary Charan Singh Nagar, Navalgarh Road, Ward No. 41,
Distt- Sikar, (Raj.) (Co-Applicant), Shri- Rameshwar Lal Choudhary S/o Shri- Tulsi Ram
Choudhary, Add.- Sikar Marg, Kadva Complex Kuchaman City, Nagaur, Distt.- Nagaur,
(Raj.) Email- [email protected], Consultant Name:- M/s. N.S. Envro- Tech
Laboratories & Consultant, , Add- Plot No. 51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road, Mansarovar, Jaipur (Raj.).
Email:- [email protected].
Agenda no. 45. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19617)/ 2019-20
Final minutes of 4.95th meeting held on 27-29 July, 2021
Project Name- Environmental Clearance for Bambuliya Ghata Masonry Stone Mine, Ref.
No.- 20191000014359, M.L. No.- 04/2019, Area- 1.0 ha., Production Capacity- 1,27,275
TPA (ROM), Khasra No.- 131 and 306/293, Near Vill.- Bambuliya Ghata, Tehsil- Pipalda
Distt.- Kota (Raj.) (Proposal No.-209141).
Project Proponent Name: Shri Bijendra Verma , Add.- R/o- Vill.- Jhirwali Ka Bas, Post-
Karoth, Tehsil- Rajgarh, Distt.- Alwar (Raj.), [email protected].
Consultant Name- M/s. N.S. Enviro-Tech Laboratories & Consultant, Add.- Plot No.-51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road Mansarover- Jaipur- (Raj.)
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Bambuliya Ghata Masonry Stone Mine,
Ref. No.- 20191000014359, M.L. No.- 04/2019, Area- 1.0 ha., Production Capacity-
1,27,275 TPA (ROM), Khasra No.- 131 and 306/293, Near Vill.- Bambuliya Ghata, Tehsil-
Pipalda Distt.- Kota (Raj.) (Proposal No.-209141). The project is covered under B2 category.
The SME, Kota vide order dated 15.02.2021 has issued LoI to the PP for mining of Masonry
Stone .The mining plan has been approved by the SME, Kota vide letter dated 09.04.2021.
ME, Kota in his certificate dated 05.03.2021 has stated that the mining lease does not fall in
Aravalli hills.
The SEAC considered the certificate dated 05.03.2021 issued by ME, Kota In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
DCF, Kota in his certificate dated 05.01.2021 has stated that the applied lease area is
non forest land and nearest forest land is at a distance of 1.40 Km from the applied lease area.
The certificate, however, does not speak about existence or otherwise of National Park or
Wildlife Sanctuary from the applied lease area. The SEAC, therefore, decided to ask the PP
to submit certificate from concerned DCF regarding existence or otherwise of National Park
or Wildlife Sanctuary from the applied lease area. within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Agenda no. 46. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2( 19620)/ 2019-20
Project Name- EC for Proposed Project of Masonry Stone Mining project, Plot. No.
176/1996, Area 1.00 Ha., Production Capacity- 62,475 TPA (ROM), Khasra No. 336, Add.-
Bhopas Dungri, Tehsil- Chomu, District- Jaipur, (Raj.) (Proposal No.- 215830).
Project Proponent Name- Shri- Mahendra Kumar Saini S/o Shri- Rajendra Kumar Saini,
Add.- K-25, Bhawani Nagar, Murlipura, Jaipur, Distt.- Jaipur, (Raj.), Email-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name- M/s. N.S. Envro- Tech Laboratories & Consultant, , Add- Plot No. 51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road, Mansarovar, Jaipur (Raj.).
Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /Item No.(In Schedule): 1(a) B2
2 Location of Project “Bhopas Dungri Masonry Stone Mining
Project”, M.L No.- 176/96, Area- 1.00 Ha.,
Khasra No-336 Near Village- Bhopas
Dungri, Tehsil – Chomu, District – Jaipur
(Rajasthan) of Mahendra Kumar Saini S/o
Shree Rajendra Kumar Saini.
3 Project Details ML. No. / Production Capacity Applied Area- 1.00 Ha. Khasra No – 336,
Proposed Production Capacity – 62,475 TPA
(ROM)
4 Project Cost: 50.0 Lacs
5 Water Requirement & Source: 4.50 KLD
6 Fuel &Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document Submitted:- SIE/RJ/MIN/215830/2021 on dated 19-06-
2021
8 Information About Aravalli Certificate. Aravalli letter was issued by ME Jaipur vide
letter no. ME/Jai/ Minor/CC-4/Chomu/M.L
176/1996/399 on dated 30.03.2021
9 Date of Air/Water/Noise/Monitoring Nodia Testing Laboratories 25/05/2021 to
29.05.2021
10 Information About 500 mts Composite Map 500 Mtr Map was issued by ME Jaipur vide
letter no. ME/JPR/DWG/2021/457 on dated
30.03.2021
1 Environment Management Plan EMP Cost – Capital Cost 2.0 Lac &
Recurring Cost is 2.18 Lac/Annum
S. No. Particulars Capital Cost in
Lakh Recurring Cost in Lakh
1 Pollution control ( water sprinkling for dust
suppression ) 0.80 0.40
2 Pollution monitoring (Air. Water ,Noise, Soil) -- 0.70
3 Greenbelt 0.40 0.53
4 Occupation health 0.40 0.25
5 Miscellaneous (Fencing with maintenance
etc.) 0.40 0.30
Total 2.0 Lakh 2.18 lakh/Annum
13 Green Belt/ Plantation Capital Cost- 0.40 Lakh
Recurring Cost 0.53 Lac/Annum
Places of Plantation:-
About 330 saplings will be planted in an area of 0.33 ha (33% of applied area) upto the end of 5 years, About 330
sapling will be planted along the lease boundary at safety barrier zone & out side lease area at Grampanchyat
Hathnoda Khasra No 2384/2338
Year
Along the mine
boundary
On Backfilled
area
Outside the
mine area Top Soil Dumps Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees Trees
Existing -- -- -- -- - -- -- -- -- --
2021-2022 0.046 46 -- -- 0.02 20 -- -- 0.066 66
2022-2023 0. 046 46 ---- -- 0.02 20 - - 0.066 66
2023-2024 0.046 46 -- -- 0.02 20 - - 0.066 66
2024-2025 0.046 46 -- -- 0.02 20 -- -- 0.066 66
Final minutes of 4.95th meeting held on 27-29 July, 2021
2025-2026 0.046 46 -- -- 0.02 20 -- - 0.066 66
TOTAL 0.23 230 -- -- 0.10 100 -- -- 0.33 330
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
14 Budgetary Breakup For Labor Labor Welfare Cost Capital Cost-1.0 Lakh
and Recurring Cost is 0.60 Lakh/Annum
Sr. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In RS.
Per Year
1. Drinking water provided By Tanker 30,000/- 25,000/-
2. First Aid Box 5,000/- --
3. Rest Shelter 20,000/- 10,000/-
4. Washroom Facilities for laborers 15,000/- 10,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear
plugs, Helmet 20,000/- 10,000/-
6 Insurance 10,000/- 5,000/-
Total 1.0 lakh 0.60 lakh/Annum
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
This is an existing lease. Initially the mining lease was granted in favour of Shri Jai
Singh S/o Shri Pradeep Singh vide order dated 10.02.1997. The lease deed was executed on
dated 23.10.1998 and was registered on 30.10.1998 for 20 years (30.10.1998 to 29.10.2018).
Later on the lease was transferred to Shri Mahendra Kumar Saini S/O Shri Rajendra Kumar
Saini vide order dated 19.01.2006. Lease validity was auto extended for 50 years and valid up
to 29.10.2048.
The project being one of minor mineral having lease area of 1.0 ha., came under the
purview of the EIA Notification dated 09.09.2013 of the MoEF & CC. According to the
certificate dated 22.07.2021 of ME, Jaipur, production of mineral from 2012-13 (base year)
to 2020-21 has been nil. The project, therefore, is not one of violation of the EIA
Notification. The PP has also submitted affidavit to the affect that no activity has been carried
out in violation of the EIA Notification and Common Cause Judgment pronounced by the
Hon’ble Supreme Court.
The PP has submitted application for the first time for EC for Proposed Project of
Masonry Stone Mining project, Plot. No. 176/1996, Area 1.00 Ha., Production Capacity-
62,475 TPA (ROM), Khasra No. 336, Add.- Bhopas Dungri, Tehsil- Chomu, District-
Jaipur, (Raj.) (Proposal No.- 215830). The project is covered under B2 category. The
Simplified mining plan has been approved by the SME, Jaipur vide letter dated 09.06.2017.
ME, Jaipur in his certificate dated 30.03.2021 has stated that the mining lease does not fall in
Aravalli hills. DCF (TP), Sariska in his certificate dated 16.06.2021 has stated that Sariska
Tiger Reserve is at a distance of 48.0 Km and Sariska WLS is at a distance of 55.5 Km, DCF,
WL, Jaipur in his certificate dated 30.06.2021 has stated that Jamwaramgarh WLS is at a
distance of 27.4 Km and DCF, WL, Zoo, Jaipur in his certificate dated 24.06.2021 has stated
that Nahargarh WLS is at distance of 19.3 Km from the applied lease area and there is no
Wildlife Sanctuary/National Park/ Conservation Reserve within 10 km periphery of the mine.
The project does not involve approval/ clearance under the Forest (Conservation) Act, 1980
Final minutes of 4.95th meeting held on 27-29 July, 2021
and Wild Life Protection Act, 1972 as no forest land is involved and neither there is any Wild
Life Sanctuary/ National Park within 10 Km from the project site.
The SEAC considered the certificate dated 30.03.2021 issued by ME, Jaipur In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri-
Mahendra Kumar Saini S/o Shri Rajendra Kumar Saini, for Masonry Stone Mining project,
Plot. No. 176/1996, Area 1.00 Ha., Production Capacity- 62,475 TPA (ROM), Khasra No.
336, Add.- Bhopas Dungri, Tehsil- Chomu, District- Jaipur, (Raj.) (Proposal No.- 215830),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent :- Shri- Mahendra Kumar Saini S/o Shri-
Rajendra Kumar Saini, Add.- K-25, Bhawani Nagar, Murlipura, Jaipur, Distt.- Jaipur, (Raj.)
Email- [email protected], Consultant Name:- M/s. N.S. Envro- Tech
Laboratories & Consultant, , Add- Plot No. 51, Ganeta House, Shiv Vihar Colony, Near
Patrakar Colony Road, Mansarovar, Jaipur (Raj.).
Email:- [email protected].
Agenda no. 47. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19621/ 2019-20
Project Name- EC for Masonry Stone Mining project, Plot. No. 16/2020, Area 1.6997 Ha.,
Production Capacity- 4,30,737 TPA (ROM), Khasra No. 410, Add.- Gunawata, Tehsil-
Amer, District- Jaipur, (Raj.), (Proposal No.- 215850).
Project Proponent Name- Shri- Ramesh Chand Gupta S/o Shri- Gyarsi Lal Gupta, Add.-
11-Moji Colony, Malviyanagar, Distt.- Jaipur, (Raj.) Email-
Consultant Name- M/s. N.S. Envro- Tech Laboratories & Consultant, , Add- Plot No. 51,
Ganeta House, Shiv Vihar Colony, Near Patrakar Colony Road, Mansarovar, Jaipur (Raj.).
Email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1 Category /Item No.(In Schedule): 1(a) B2
2 Location of Project Gunawata Masonry Stone Mining Project,
Plot No.- 16/2020, Area- 1.6997 Ha., Near
Village- Gunawara, Tehsil – Amer, District
– Jaipur (Rajasthan) of Shri Ramesh Chand
Gupta S/o Shree Gyarsi Lal Gupta.
Final minutes of 4.95th meeting held on 27-29 July, 2021
3 Project Details ML. No. / Production Capacity Applied Area- 1.6997 Ha. Khasra No – 410,
Proposed Production Capacity – 4,30,737
TPA (ROM)
4 Project Cost: 40.0 Lacs
5 Water Requirement & Source: 5.KLD
6 Fuel &Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document Submitted:- SIE/RJ/MIN/206417/2021 on dated 26-03-
2021
8 Information About Aravalli Certificate. Aravalli letter was issued by ME Jaipur vide
letter no. ME/Jai/ CC-3/Plot No-16/20/75 on
dated 18.06.2021
9 Date of Air/Water/Noise/Monitoring Nodia Testing Laboratories 26/05/2021 to
30.05.2021
10 Information About 500 mts Composite Map 500 Mtr Map was issued by ME Jaipur vide
letter no. ME/JPR/DWG/2021/485 on dated
18.06.2021
1 Environment Management Plan EMP Cost – Capital Cost 1.60 Lac&
Recurring Cost is 1.66 Lac/Annum
S.
No. Particulars
Capital Cost in
Lakh Recurring Cost in Lakh
1 Pollution control ( water sprinkling for dust
suppression ) 0.55 0.25
2 Pollution monitoring (Air. Water ,Noise, Soil) -- 0.40
3 Greenbelt 0.56 0.73
4 Occupation health 0.25 0.10
5 Miscellaneous (Fencing, etc.) 0.24 0.15
Total 1.60 Lakh 1.63 lakh/Annum
12 Green Belt/ Plantation Capital Cost- 0.56 Lakh
Recurring Cost 0.73 Lac/Annum
Places of Plantation:-
About 560 saplings will be planted in an area of 0.560 ha (33% of applied area) upto the end of 5 years, About
560 sapling will be planted along the lease boundary at safety barrier zone& out side lease area at Govt.
Primary School, Gunavta, Jaipur (Raj).
Year
Along the mine
boundary
On Backfilled
area
Outside the
mine area Top Soil Dumps Total
Area
(Ha.)
No. of Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees
Area
(Ha.)
No. of
Trees Trees
Existing -- -- -- -- - -- -- -- -- --
2021-2022 0.04 40 -- -- 0.072 72 -- -- 0.112 112
2022-2023 0. 04 40 ---- -- 0.072 72 - - 0.112 112
2023-2024 0.04 40 -- -- 0.072 72 - - 0.112 112
2024-2025 0.04 40 -- -- 0.072 72 -- -- 0.112 112
2025-2026 0.04 40 -- -- 0.072 72 -- - 0.112 112
TOTAL 0.20 200 -- -- 0.36 360 -- -- 0.560 560
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
13 Budgetary Breakup For Labor Labor Welfare Cost Capital Cost-0.80 Lakh
and Recurring Cost is 0.40 Lakh/Annum
Sr. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In RS.
Per Year
1. Drinking water provided By Tanker 20,000/- 10,000/-
2. First Aid Box 5,000/- --
3. Rest Shelter 20,000/- 7000/-
4. Washroom Facilities for laborers 10,000/- 8,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear
plugs, Helmet 15,000/- 10,000/-
6 Insurance 10,000/- 5,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Total 0.80 lakh 0.40 Lakh/Annum
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Masonry Stone Mining project, Plot. No.
16/2020, Area 1.6997 Ha., Production Capacity- 4,30,737 TPA (ROM), Khasra No. 410,
Add.- Gunawata, Tehsil- Amer, District- Jaipur, (Raj.), (Proposal No.- 215850). The
project is covered under B2 category. The SME, Jaipur vide order dated 23.02.2021 and
24.03.2021 (corrigendum regarding rectification of PPs name in LoI) has issued LoI to the PP
for mining of Masonry Stone. The mining plan has been approved by the SME, Jaipur vide
letter dated 10.06.2021. ME, Jaipur in his certificate dated 18.06.2021 has stated that the
mining lease does not fall in Aravalli hills. DCF (WL), Jaipur in his certificate dated
30.06.2021 has stated that Jamwaramgarh WLS is at a distance of 7.52 Km and its ESZ is at a
distance of 6.45 Km from the applied lease area. Similarly DCF, WL, Zoo, Jaipur in his
certificate dated 29.06.2021 has stated that Nahargarh WLS is at a distance of 8.7 Km and its
ESZ is at a distance of 0.36 Km from the applied lease area.
The SEAC also went through para 4 (i)/ (ii)/ (iii) and (iv) of the OM dated 08.08.2019
of the MoEF & CC which requires that the Expert Appraisal Committee would examine the
proposal from environmental angle including impact of developmental activity/ project on the
Wildlife and its habitat, if any, and recommend appropriate protection and conservation
measures and that these recommendations shall be explicitly mentioned in the EC letter.
Since the project falls within a distance of 10 Km from the boundary of National Park/
Wildlife Sanctuary and outside notified ESZ, the following specific conditions shall also be
applicable in terms of OM dated 08.08.2019 of the MoEF & CC:
1. The mining activity should be carried out in a manner so that the water
regime/system of the sanctuary is not disturbed. The mining activity should not
adversely affect any existing water course, water body, catchment etc. The PP
shall while carrying out mining activity ensure compliance of the provisions of
Air (Prevention and Control of Pollution) Act 1981, Water (Prevention and
Control of Pollution) Act 1974 and the Environment (Protection) Act, 1986 so that
the wildlife in the area is not adversely affected.
2. The processes like blasting, drilling, excavation, transport and haulage resulting
into noise, should be carried out in such an manner so that such activities do not
disturb wild animals and birds particularly during sunset to sunrise. The level of
noise should be kept within the permissible limits.
3. The mining activity should not create any obstacle in the way of free movement of
wildlife and adversely affect wildlife corridors.
4. The mineral waste/ slurry should be dumped only at the designated places only
and such waste dumps should be reclaimed in accordance with the conditions of
the mining plan/ consent issued by the RSPCB under the Water and Air act.
Final minutes of 4.95th meeting held on 27-29 July, 2021
5. The PP shall cooperate with the concerned DCF, Wildlife in their efforts towards
protection and conservation of wildlife in the Sanctuary/ Park.
6. The PP shall ensure that the transporter and labor employed by him should not
damage flora and fauna in the ESZ and the Wildlife Sanctuary/ National Park.
The SEAC considered the certificate dated 18.06.2021 issued by ME, Jaipur In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form- 2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to Shri- Ramesh
Chand Gupta S/o Shri- Gyarsi Lal Gupta, for Masonry Stone Mining project, Plot. No.
16/2020, Area 1.6997 Ha., Production Capacity- 4,30,737 TPA (ROM), Khasra No. 410,
Add.- Gunawata, Tehsil- Amer, District- Jaipur, (Raj.), (Proposal No.- 215850), with the
stipulation that the PP shall abide by the annual production scheduled specified in mining
plan and that any deviation there in will render the PP liable for legal action in accordance
with Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. The PP shall also abide by the special conditions as mentioned in OM dated
08.08.2019 and as noted in the above mentioned observations. Name of Proponent Shri-
Ramesh Chand Gupta S/o Shri- Gyarsi Lal Gupta, Add.- 11-Moji Colony, Malviyanagar,
Distt.- Jaipur, (Raj.), Email- [email protected], Consultant Name:- M/s.
N.S. Enviro- Tech Laboratories & Consultant, Add- Plot No. 51, Ganeta House, Shiv Vihar
Colony, Near Patrakar Colony Road, Mansarovar, Jaipur (Raj.),
Email:- [email protected].
Agenda no. 48. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19595)/ 2019-20
Project Name- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project, ML. No.- 86/2010, Area-1.00 ha., Production Capacity- 55,000 TPA (ROM)
{Saleable Mineral- 49,500 TPA, Waste- 5500 TPA }, Khasra No.- 295, Near Vill.- Bhedoli,
Tehsil- Bonli, Distt.- Sawai Madhopur (Raj.) (Proposal No.-212036).
Project Proponent Name- M/s Aditya Minerals, Add.- R/o-- Jai Mandir Ke Pass, Jhilai
Road, Niwai, Distt.- Tonk (Raj.) Email- [email protected].
Consultant Name- VARDAN ENVIRONET Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003 (Haryana). email:[email protected].
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
This is an existing lease. Initially the mining lease was granted in favour of Shri
Mukesh Kumar vide order dated 04.05.2011. The lease deed was registered on 30.09.2011 for
Final minutes of 4.95th meeting held on 27-29 July, 2021
30 years. Later on the lease was transferred to M/s Aditya Minerals vide order dated
18.12.2014.
The project being one of minor mineral having lease area of 0.1393 ha., came under
the purview of the EIA Notification dated 09.09.2013 of the MoEF & CC. According to the
certificate dated 27.07.2021 of AME, Sawai Madhopur, production of mineral from 2012-13
(base year) to 2020-21 has been nil. The project, therefore, is not one of violation of the EIA
Notification. The PP has also submitted affidavit to the affect that no activity has been carried
out in violation of the EIA Notification and Common Cause Judgment pronounced by the
Hon’ble Supreme Court.
The PP has submitted application for Environmental Clearance for Masonry Stone
(Minor Mineral) Mining Project, ML. No.- 86/2010, Area-1.00 ha., Production Capacity-
55,000 TPA (ROM) {Saleable Mineral- 49,500 TPA, Waste- 5500 TPA }, Khasra No.- 295,
Near Vill.- Bhedoli, Tehsil- Bonli, Distt.- Sawai Madhopur (Raj.) (Proposal No.-212036).
The project is covered under B2 category. The mining plan has been approved by the SME,
Bharatpur vide letter dated 02.03.2020. ME, Sawai Madhopur in his certificate dated
15.07.2021 has stated that the mining lease does not fall in Aravalli hills.
The SEAC considered the certificate dated 15.07.2021 issued by ME, Sawai Madhopur
In the certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there
is no other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Agenda no. 49. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19596)/ 2019-20
Project Name- Environmental Clearance for Quartz & Feldspar (Minor Mineral) Mining
Project, ML. No.- 110/2012, Area- 4.5007 ha., Production Capacity- 1,79,494 TPA (ROM)
{Saleable 1,25,646 TPA, Sub grade- 26,924 TPA & Waste- 26,924 TPA} at Khasra No.-
1793,3168/1794, 3157/1794, 1795, 1791, 1798, 1802, 1838, 1839, 1840, 1841, 1842, 1843,
1844, 1845, 1846, 3162/1847, 3173/1847, 1848, 1849 and 3163/1851, Near Vill.- Khemana,
Tehsil- Raipur, Distt.- Bhilwara, (Raj.) (Proposal No.- 212082).
Project Proponent Name- M/s Jai Shree Ganga Mines, Add.- R/o-Ward No.- 5, Main Road,
Gangapur, Tehsil- Sahada, Distt.- Bhilwara (Raj.) Email- [email protected].
Consultant Name- VARDAN ENVIRONET, Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003 (Haryana)., email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1
.
Category / Item no.(in
Schedule):
1(a)B2
2. 2
.
Location of Project Near village –Khemana, Tehsil– Raipur, District –Bhilwara(Rajasthan)
Final minutes of 4.95th meeting held on 27-29 July, 2021
3. 3
.
Project Details
M.L.No. /Area/Production
capacity/Khasra No.
M.L. No.-110/2012
Area – 4.5007 Hectare
Production capacity -179494 TPA (ROM) [Saleable- 125646 TPA, Sub grade-
26924 TPA & Waste- 26924 TPA]
Khasra No.-1793, 3168/1794, 3157/1794, 1795, 1791, 1798, 1802, 1838, 1839,
1840, 1841, 1842, 1843, 1844, 1845, 1846, 3162/1847, 3173/1847, 1848, 1849,
3163/1851
4. 4
.
Project Cost Rs. 50 Lakhs
5. 5
.
Water Requirement & Source 3.0 KLD (Tanker Water Supply from nearby village)
6. 6
.
Fuel & Energy
300Litres/day HSD Fuel will be required for mine machineries.
7. 7
.
Application No.& Date &
documents submitted
Hard Copy Submitted to SEIAA, Rajasthan SIA/RAJ/MIN/208342/2021, dated
.04.21
8. 8 Information about Aravalli
Certificate
ME/Bhil/Machi./M.L. 110/2012/1013 onDated- 25/11/2019
Date of Air/Water/Noise
Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
9. 9 Information about Topo-sheet
map
45 K 03
10. Environment Sensitivity
1 Nearest Village Nearest Village is Khamana at a distance of 0.9 km in South direction from the mine site.
2 Nearest Railway Station Nearest Railway Station is Amet Railway Station at a distance of 23.0 km in West direction from the mine site.
3 Nearest Airport Nearest Airportis MaharanaPratap Airport, Udaipur at a distance of 84.0 km in SW direction from the mine site.
4 Nearest National / State Highway S.H.-61 at a distance of 20 Km in NE direction from the mine site.
5 Archaeological Important Place No any Archaeological Important Place found within 15 km distance from the periphery of lease area.
6 Ecological Sensitive Park, Wildlife Sanctuary, Reserve etc.)
No any Ecological Sensitive Park, Wildlife Sanctuary, Reserve etc. found within 15 km distance from the periphery of lease area.
7 Nearest River/water body
NaharSagar at a distance of 6.4 km in West direction from the mine site.
Kothari River at a distance of 9.5 km in NW direction from the mine site. PadamSagar at a distance of 10.7 km in West direction from the mine site. BanmaniNadi at a distance of 13.0 km in East direction from the mine site. KhushalSagar at a distance of 13.0 km in SE direction from the mine site. FatehSagar at a distance of 14.2 km in South direction from the mine site.
JhanvaranKaTalav at a distance of 14.4 km in SE direction from the mine site.
8 Reserved/Protected Forests
Charot P.F. at a distance of 5.4 km in SW direction from the mine site. Sirodi P.F. at a distance of 10.5 km in West direction from the mine site. Sarawat Mata P.F. at a distance of 9.3 km in NW direction from the mine site. Kangni R.F. at a distance of 11.8 km in SE direction from the mine site.
Final minutes of 4.95th meeting held on 27-29 July, 2021
11. 1
0
Environment Management Plan
Sr.No. PARTICULAR CAPITAL COST
(IN RS.) RECURRING COST
(IN RS./YEAR)
1 Water sprinkle facility on haul roads to prevent dust suppression. - 30,000/-
2 Maintenance of approach road - 70,000/-
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality - 50,000/-
4 Plantation/Green Belt & maintenance 4,00,000/- 80,000/-
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 30,000/-
7 Provision of PPES (helmet shoes gloves goggles etc.) - 10,000/-
9 Emergency rescue fire fighting equipments and first aid 30,000/- 15,000/-
10 Caution board (will illustrate lease detail and name of the PHC and contact no. of doctor)
20,000/- 1,000/-
11 Solar pole with LED light @ 8000/- Per Light 50,000/- 4,000/-
TOTAL 6,00,000/- 3,00,000/-
12. 1
2
Green Belt/ Plantation
Year Un-worked Area (Outside haul
roads)
Top Soil Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.
No. Of
Trees
Area
(Ha.)
No. Of
Trees
Area (Ha.) No. Of
Trees
Existing - - - - - - - -
I 0.50 500 0.01 10 0.51 510
II 0.49 490 - - 0.49 490
III 0.49 490 - - 0.49 490
IV Maintenance - - - - Maintenance
V
Total 1.48 1480 0.01 10 1.49 1490
Annual expenditure: Rs80, 000/- Total 1490 saplings will be planted in upcoming 3 years and Area for plantation-1.48
ha will developed inside the lease area at 7.5 m safety boundary & rest 0.01 ha. will developed as greenbelt outside
along haul roads.
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area and any other
area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for
growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20.
13. 1
3
Budgetary Breakup for Labour
Annual expenditure: Rs30,000
Sr.No
.
Description Capital Cost(in Rs.) Recurring Cost(in Rs./Yr.)
1 Rest Shelter 40,000 1,000
2 Drinking water facility 20,000 3,000
3 Toilet Facility (2 units for Male & Female) 10,000 2,000
4 Fuel for cooking - 10,000
5 Medical facility for labors - 14,000
Total 70,000 30,000
14. 1
4
Present Status
Existing Mining Project
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
Final minutes of 4.95th meeting held on 27-29 July, 2021
This is an existing lease. The mining lease for mineral Quartz and Feldspar over an
area 4.5007 ha was granted in favour of M/S Jai Shree Ganga Mines vide order dated
16.05.2013. The lease deed was registered on 12.08.2013 for 30 years.
The project being one of major mineral (before 10.02.2015) having lease area of
4.5007 ha. (less than 5.0 ha.), came under the purview of the EIA Notification dated
07.10.2014 of the MoEF & CC. According to the certificate dated 26.07.2021 of AME,
Bhilwara the production of mineral from 2013-14 (base year) to 2020-21 has been nil. The
project, therefore, is not one of violation of the EIA Notification. The PP has also submitted
affidavit to the affect that no activity has been carried out in violation of the EIA Notification
and Common Cause Judgment pronounced by the Hon’ble Supreme Court.
The PP has submitted application for EC for Quartz & Feldspar (Minor Mineral)
Mining Project, ML. No.- 110/2012, Area- 4.5007 ha., Production Capacity- 1,79,494 TPA
(ROM) {Saleable 1,25,646 TPA, Sub grade- 26,924 TPA & Waste- 26,924 TPA} at Khasra
No.- 1793,3168/1794, 3157/1794, 1795, 1791, 1798, 1802, 1838, 1839, 1840, 1841, 1842,
1843, 1844, 1845, 1846, 3162/1847, 3173/1847, 1848, 1849 and 3163/1851, Near Vill.-
Khemana, Tehsil- Raipur, Distt.- Bhilwara, (Raj.) (Proposal No.-212082). The project is
covered under B2 category. The mining plan has been approved by the SME, Bhilwara vide
letter dated 03.01.2019. AME, Bhilwara in his certificate dated 25.11.2019 has stated that the
mining lease does not fall in Aravalli hills. DCF, Bhilwara in his certificate dated 02.12.2019
has stated that there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10
km periphery of the mine in his jurisdiction.
DCF (WL), Rajsamand in his certificate dated 23.11.2020 has stated that Todgarh
Raoli WLS is situated at a distance of 28.0 Km and Kumbhalgarh WLS is situated at a
distance of 35.5 Km from the applied lease area.
The project does not involve approval/ clearance under the Forest (Conservation)
Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved and neither there
is any Wild Life Sanctuary/ National Park within 10 Km from the project site.
According to cluster certificate and map dated 19.07.2021 issued by AME, Bhilwara,
issued in terms of Notifications of MoEF & CC dated 15.01.2016 and 01.07.2016, there is no
cluster formation.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s Jai Shree
Ganga Mines, for Quartz & Feldspar (Minor Mineral) Mining Project, ML. No.- 110/2012,
Area- 4.5007 ha., Production Capacity- 1,79,494 TPA (ROM) {Saleable 1,25,646 TPA, Sub
grade- 26,924 TPA & Waste- 26,924 TPA} at Khasra No.- 1793, 3168/1794, 3157/1794,
1795, 1791, 1798, 1802, 1838, 1839, 1840, 1841, 1842, 1843, 1844, 1845, 1846, 3162/1847,
3173/1847, 1848, 1849 and 3163/1851, Near Vill.- Khemana, Tehsil- Raipur, Distt.-
Bhilwara, (Raj.) (Proposal No.-212082), with the stipulation that the PP shall abide by the
annual production scheduled specified in mining plan and that any deviation there in will
Final minutes of 4.95th meeting held on 27-29 July, 2021
render the PP liable for legal action in accordance with Environment and Mining Laws, with
the specific and general conditions annexed at Annexure ‘A’. Name of Proponent M/s Jai
Shree Ganga Mines, Add.- R/o-Ward No.- 5, Main Road, Gangapur, Tehsil- Sahada, Distt.-
Bhilwara (Raj.), Email- [email protected], Consultant Name:- VARDAN
ENVIRONET Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
Agenda no. 50. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19598)/ 2019-20
Project Name- Environmental Clearance for Marble Mineral Mining Project, Plot No.- 5,
Production Capacity- 3,48,106 TPA (ROM) {Saleable Mineral Marble- 1,31,021 TPA,
Waste- 1,91,367 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536, Near Vill.-
Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210560).
Project Proponent Name- M/s Paramount Mines & Minerals, Pro. Shri Mahesh Agarwal ,
Add.- R/o- B-106, 10-B, Scheme Gopalpura Bypass Jaipur, (Raj.) Email-
Consultant Name- VARDAN ENVIRONET, Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon- 122003 (Haryana)., email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1
.
Category / Item no.(in
Schedule):
1(a)B2
2. 2
.
Location of Project Near village –Lohagarh, Tehsil– Dhariyawad, District– Pratapgarh(Rajasthan)
3. 3
.
Project Details
M.L.No. /Area/Production
capacity/Khasra No.
Plot No.-05
Area – 4.0 Hectare
Production capacity -348106 TPA (ROM) {Salable Mineral Marble-1,31,021 TPA, Waste – 1,91,367 TPA & OB- 25,718 TPA}
Khasra No.-1536
4. 4
.
Project Cost Rs. 80 Lakhs
5. 5
.
Water Requirement & Source 3.0 KLD (Tanker Water Supply from nearby village)
6. 6
.
Fuel & Energy
250Litres/day HSD Fuel will be required for mine machineries.
7. 7
.
Application No.& Date &
documents submitted
Online Submitted by Proposal No.-SIA/RAJ/MIN/210560/2021, dated 29.04.21
8. 8 Information about Aravalli
Certificate
ME/Pratap/CC-Minor/Delie Plot No.05/2019/2020-21/148 onDated- 22/1/2021
Date of Air/Water/Noise
Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
9. 9 Information about Topo-sheet
map
45I 5
10. Environment Sensitivity
1 Nearest Village Nearest Village is Lohagarh at a distance of 3.24 km in North direction from the
mine site.
2 Nearest Railway Station Nearest railway station is Semari Railway Station ~ 44.78 km in NW direction
from Mine Site.
3 Nearest Airport Nearest Airport is in Udaipur ~ 79.91 Km in NW direction from mine site.
4 Nearest National / State
Highway
S.H.-32 is found about 14.0 km in SW direction from mine site.
No any Nearest National found within 15 km distance from the periphery of lease
area.
Final minutes of 4.95th meeting held on 27-29 July, 2021
5 Archaeological Important
Place
No any Archaeological Important Place is found within 15 km distance from the
periphery of lease area.
6 Ecological Sensitive Park,
Wildlife Sanctuary, Reserve
etc.
No any Ecological Sensitive Park, National Parks, Wildlife Sanctuary, Reserve
etc. are found within 15 km distance from the periphery of lease area.
7 Nearest River / water body Jakam River is found about 0.60 km in ESE direction from mine site.
BinatalNadi is found about 8.3 km in NE direction from mine site.
Mahi River is found about 10.2 km in SE direction from mine site.
SukilNadi is found about 14.6 km in NE direction from mine site.
BarasNadi is found about 14.3 km in WNW direction from mine site.
Som River is found about 6.1 km in SW direction from mine site.
8 Reserved/Protected Forests Kanaiya RF exists about 2.8 km in SSE direction from mine site.
Haswar PF exists about 3.8 km in ESE direction from mine site.
Padlabavri PF exists about 5.3 km in NE direction from mine site.
Padlabavri RF exists about 7.3 km in NE direction from mine site.
Devla PF exists about 5.1 km in NE direction from mine site.
Manpur PF exists about 9.1 km in ENE direction from mine site.
Makpura PF exists about 13.0 km in ESE direction from mine site.
Jagpura RF exists about 11.1 km in SE direction from mine site. Mundela RF exists about 10.2 km in SE direction from mine site.
Rathri PF exists about 2.3 km in SW direction from mine site.
Dad RF exists about 12.1 km in WSW direction from mine site.
Dad PF exists about 13.7 km in WNW direction from mine site.
Manpur Block RF exists about 6.5 km in NW direction from mine site.
Padva Block RF exists about 9.0 km in NNW direction from mine site.
Padla Block PF exists about 10.3 km in N direction from mine site.
Narveri PF exists about 12.6 km in NNE direction from mine site.
Dholagarh Block RF exists about 13.5 km in NW direction from mine site.
Kukra Block RF exists about 14.0 km in NNW direction from mine site.
Sarvadiven Block RF exists about 13.5 km in NW direction from mine site.
11. 1
0
Environment Management Plan
Sr.
No. PARTICULAR
CAPITAL
COST
(IN RS.)
RECURRING
COST
(IN
RS./YEAR)
1 Water sprinkle facility on haul roads to prevent dust suppression. - 40,000
2 Maintenance of approach road - 1,00,000
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality - 50,000
4 Plantation/Green Belt & maintenance 4,00,000 1,20,000
5 Wire fence around mining pits 1,00,000 30,000
6 Occupational health check-up in a year - 40,000
7 Provision of PPES (helmet shoes gloves goggles etc.) - 10,000
9 Emergency rescue fire fighting equipments and first aid 30,000 5,000
10 Caution board (will illustrate lease detail and name of the PHC and
contact no. of doctor) 20,000 1,000
11 Solar pole with LED light @ 8000/- Per Light 50,000 4,000
TOTAL 6,00,000 4,00,000
12. 1
2
Green Belt/ Plantation Year Un-worked Area (Outside haul
roads)
Top Soil Dumps Total
Area
(Ha.)
No. of
Trees
Area
(Ha.
No. Of
Trees
Area
(Ha.)
No. Of
Trees
Area (Ha.) No. Of
Trees
Existing - - - - - - - -
I 0.38 380 0.1 100 0.48 480
II 0.37 370 0.1 100 0.47 470
III 0.37 370 0.37 370
IV Maintenance - - - - Maintenance
V
1.12 1120 0.2 200 1.32 1320
Final minutes of 4.95th meeting held on 27-29 July, 2021
Annual expenditure: Rs 1, 20,000 Total 1320 saplings will be planted in upcoming 3 years and Area for plantation-1.12
ha. will developed inside the lease area at 7.5 m safety boundary & rest will developed as greenbelt outside along haul
roads.
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area and any other
area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for
growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20.
13. 13
Budgetary Breakup for Labour
Annual expenditure: Rs30,000
Sr.No
.
Description Capital Cost(in Rs.) Recurring Cost(in Rs./Yr.)
1 Rest Shelter 40,000 1,000
2 Drinking water facility 20,000 3,000
3 Toilet Facility (2 units for Male & Female) 10,000 2,000
4 Fuel for cooking - 10,000
5 Medical facility for labors - 14,000
Total 70,000 30,000
14. 1
4
Present Status
New Mining Project
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for EC for Marble Mineral Mining Project, Plot
No.- 5, Production Capacity- 3,48,106 TPA (ROM) {Saleable Mineral Marble- 1,31,021
TPA, Waste- 1,91,367 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536, Near
Vill.- Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210560). The
project is covered under B2 category. The SME, Udaipur vide order dated 21.12.2020 has
issued LoI to the PP for mining of Marble. The mining plan has been approved by the SME,
Udaipur vide letter dated 20.04.2021. ME, Pratapgarh in his certificate dated 22.01.2021 has
stated that the mining lease does not fall in Aravalli hills. DCF, WL, Chittorgarh in his
certificate dated 05.03.2021 has stated that Sitamata WLS is at a distance of 28.56 Km from
the applied lease area and there is no Wildlife Sanctuary/National Park/ Conservation
Reserve within 10 km periphery of the mine. The project does not involve approval/
clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as
no forest land is involved and neither there is any Wild Life Sanctuary/ National Park within
10 Km from the project site.
As per cluster certificate issued by ME, Pratapgarh on 22.01.2021, the total area of all
the mining leases in the cluster having area of 4.00 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s
Paramount Mines & Minerals, Pro. Shri Mahesh Agarwal, for Marble Mineral Mining
Project, Plot No.- 5, Production Capacity- 3,48,106 TPA (ROM) {Saleable Mineral Marble-
1,31,021 TPA, Waste- 1,91,367 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536,
Final minutes of 4.95th meeting held on 27-29 July, 2021
Near Vill.- Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210560),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent: M/s Paramount Mines & Minerals Pro. Shri
Mahesh Agarwal , Add.- R/o- B-106, 10-B, Scheme Gopalpura Bypass Jaipur, (Raj.) Email-
[email protected], Consultant Name:- VARDAN ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
Agenda no. 51. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19599)/ 2019-20
Project Name- Environmental Clearance for Marble Mineral Mining Project, Plot No.- 6,
Production Capacity- 3,09,529 TPA (ROM) {Saleable Mineral Marble- 1,25,234 TPA,
Waste- 1,58,577 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536, Near Vill.-
Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210620).
Project Proponent Name- M/s Paramount Mines & Minerals, Pro. Shri Mahesh Agarwal ,
Add.- R/o- B-106, 10-B, Scheme Gopalpura Bypass Jaipur, (Raj.) Email-
Consultant Name- VARDAN ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:[email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1
.
Category / Item no.(in
Schedule):
1(a)B2
2. . Location of Project Near village –Lohagarh, Tehsil– Dhariyawad, District– Pratapgarh(Rajasthan)
3. 3
.
Project Details
PlotNo. /Area/Production
capacity/Khasra No.
Plot No.-06
Area – 4.0 Hectare
Production capacity -3,09,529 TPA (ROM) {Salable Mineral Marble-1,25,234 TPA,
Waste – 1,58,577 TPA & OB- 25,718 TPA}
Khasra No.-1536
4. . Project Cost Rs. 80 Lakhs
5. 5
.
Water Requirement & Source 3.0 KLD (Tanker Water Supply from nearby village)
6. 6
.
Fuel & Energy
300Litres/day HSD Fuel will be required for mine machineries.
7. 7
.
Application No.& Date &
documents submitted
SIA/RAJ/MIN/210620/2021
8. 8 Information about Aravalli
Certificate
ME/Pratap/CC-Minor/Delineated Plot No.06/2019/2020-21/150 onDated- 22/1/2021
Date of Air/Water/Noise Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
9. 9 Information about Topo-sheet
map
45I 5
10. Environment Sensitivity
1 Nearest Village Lohagarh at 3.24 km in North direction from Mine Site.
2 Nearest Railway Station Nearest railway station is Semari Railway Station ~ 44.78
km in NW direction from Mine Site.
3 Nearest Airport Nearest Airport is in Udaipur ~ 79.91 Km in NW direction
from mine site.
Final minutes of 4.95th meeting held on 27-29 July, 2021
4 Nearest National / State Highway S.H.-32 is found about 14.0 km in SW direction from mine
site.
5 Archaeological Important Place None, within 15 km distance from the periphery of lease
area.
6 Ecological Sensitive Park, Wildlife
Sanctuary, Reserve etc.)
None, within 15 km distance from the periphery of lease
area.
7 Nearest River/water body Jakam River is found about 0.60 km in ESE direction from mine site.
BinatalNadi is found about 8.3 km in NE direction from
mine site.
Mahi River is found about 10.2 km in SE direction from
mine site.
SukilNadi is found about 14.6 km in NE direction from
mine site.
BarasNadi is found about 14.3 km in WNW direction from
mine site.
Som River is found about 6.1 km in SW direction from
mine site.
8 Reserved/Protected Forests Kanaiya RF exists about 2.8 km in SSE direction from mine site.
Haswar PF exists about 3.8 km in ESE direction from mine
site.
Padlabavri PF exists about 5.3 km in NE direction from
mine site.
Padlabavri RF exists about 7.3 km in NE direction from
mine site.
Devla PF exists about 5.1 km in NE direction from mine
site.
Manpur PF exists about 9.1 km in ENE direction from mine
site. Makpura PF exists about 13.0 km in ESE direction from
mine site.
Jagpura RF exists about 11.1 km in SE direction from mine
site.
Mundela RF exists about 10.2 km in SE direction from
mine site.
Rathri PF exists about 2.3 km in SW direction from mine
site.
Dad RF exists about 12.1 km in WSW direction from mine
site.
Dad PF exists about 13.7 km in WNW direction from mine site.
Manpur Block RF exists about 6.5 km in NW direction
from mine site.
Padva Block RF exists about 9.0 km in NNW direction
from mine site.
Padla Block PF exists about 10.3 km in N direction from
mine site.
Narveri PF exists about 12.6 km in NNE direction from
mine site.
Dholagarh Block RF exists about 13.5 km in NW direction
from mine site.
Kukra Block RF exists about 14.0 km in NNW direction from mine site.
Sarvadiven Block RF exists about 13.5 km in NW direction
from mine site.
11. 1
0
Environment Management Plan
Sr.
No. PARTICULAR
CAPITAL
COST
(IN RS.)
RECURRING
COST
(IN RS./YEAR)
1 Water sprinkle facility on haul roads to prevent dust suppression. - 40,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
2 Maintenance of approach road - 1,00,000
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality - 50,000
4 Plantation/Green Belt & maintenance 4,00,000 1,20,000
5 Wire fence around mining pits 1,00,000 30,000
6 Occupational health check-up in a year - 40,000
7 Provision of PPES (helmet shoes gloves goggles etc.) - 10,000
9 Emergency rescue fire fighting equipments and first aid 30,000 5,000
10 Caution board (will illustrate lease detail and name of the PHC and
contact no. of doctor) 20,000 1,000
11 Solar pole with LED light @ 8000/- Per Light 50,000 4,000
TOTAL 6,00,000 4,00,000
12. 1
2
Green Belt/ Plantation
Year Un-worked Area (Outside haul
roads)
Top Soil
Dumps
Total
Area
(Ha.)
No. of
Trees
Area
(Ha.
No. Of
Trees
Area
(Ha.)
No. Of
Trees
Area
(Ha.)
No. Of
Trees
Existing - - - - - - - -
I 0.38 380 0.1 100 0.48 480
II 0.37 370 0.1 100 0.47 470
III 0.37 370 0.37 370
IV Maintenance - - - - Maintenance
V
1.12 1120 0.2 200 1.32 1320
Annual expenditure: Rs 1,20,000/- Total 1320 saplings will be planted in upcoming 3 years and Area for plantation-
1.12 ha will developed inside the lease area at 7.5 m safety boundary & rest will developed as greenbelt outside along
haul roads.
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area and any other
area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for
growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20.
13. 1
3
Budgetary Breakup for Labour
Annual expenditure: Rs30,000
S.No. Description Capital Cost(in Rs.) Recurring Cost(in Rs./Yr.)
1 Rest Shelter 40,000 1,000
2 Drinking water facility 20,000 3,000
3 Toilet Facility (2 units for Male &
Female) 10,000 2,000
4 Fuel for cooking - 10,000
5 Medical facility for labors - 14,000
Total 70,000 30,000
14. 4 Present Status New Mining Project
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Marble Mineral Mining Project, Plot No.- 6,
Production Capacity- 3,09,529 TPA (ROM) {Saleable Mineral Marble- 1,25,234 TPA,
Waste- 1,58,577 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536, Near Vill.-
Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210620). The project
is covered under B2 category. The SME, Udaipur vide order dated 21.12.2020 has issued LoI
to the PP for mining of Marble. The mining plan has been approved by the SME, Udaipur
vide letter dated 20.04.2021. ME, Pratapgarh in his certificate dated 22.01.2021 has stated
Final minutes of 4.95th meeting held on 27-29 July, 2021
that the mining lease does not fall in Aravalli hills. DCF, WL, Chittorgarh in his certificate
dated 05.03.2021 has stated that Sitamata WLS is at a distance of 28.66 Km from the applied
lease area and there is no Wildlife Sanctuary/National Park/ Conservation Reserve within 10
km periphery of the mine. The project does not involve approval/ clearance under the Forest
(Conservation) Act, 1980 and Wild Life Protection Act, 1972 as no forest land is involved
and neither there is any Wild Life Sanctuary/ National Park within 10 Km from the project
site.
As per cluster certificate issued by ME, Pratapgarh on 22.01.2021, the total area of
all the mining leases in the cluster having area of 4.00 ha.
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-1,
Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, resolved to recommend to SEIAA for grant of EC to M/s
Paramount Mines & Minerals, Pro. Shri Mahesh Agarwal, for Marble Mineral Mining
Project, Plot No.- 6, Production Capacity- 3,09,529 TPA (ROM) {Saleable Mineral Marble-
1,25,234 TPA, Waste- 1,58,577 TPA & OB- 25,718 TPA}, Area- 4.0 ha., Khasra no.- 1536,
Near Vill.- Lohagarh, Tehsil- Dhariyawad, Distt.- Pratapgarh (Raj.) (Proposal No.-210620),
with the stipulation that the PP shall abide by the annual production scheduled specified in
mining plan and that any deviation there in will render the PP liable for legal action in
accordance with Environment and Mining Laws, with the specific and general conditions
annexed at Annexure ‘A’. Name of Proponent M/s Paramount Mines & Minerals Pro. Shri
Mahesh Agarwal , Add.- R/o- B-106, 10-B, Scheme Gopalpura Bypass Jaipur, (Raj.) Email-
[email protected], Consultant Name:- VARDAN ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
Agenda no. 52. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19628)/ 2019-20
Project Name- Application for ToR/ Transfer of EC from Shri Nirmal Kumar Patni to Dr.
Rashmi Patni for Marble Mining Lease, M.L. No. 07/1961 {22/2000 (R)}, Area 1.3935
Ha., Production Capacity- 11,394.6 TPA (ROM), at Khasra No. 977, Add.- Bhaislana,
Tehsil- Kotputli, District- Jaipur, (Raj.), (Proposal No.- 186593).
Project Proponent Name- Dr. Rashmi Patni, Add.- 5, Jha 30, Jawahar Nagar, Jaipur,
Distt.- Jaipur, (Raj.) Email- [email protected]
Consultant Name- MANTRAS GREEN RESOURCES LTD
Hall No.- 1 NICE Sankul Plot No.- A-9, Opp. Nasik Marchant Co Op Bank Ltd, ITI Signal,
MIDC Satpur, Nasik), email:[email protected].
Observations and Resolution of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
Final minutes of 4.95th meeting held on 27-29 July, 2021
This is an existing lease. Initially, the mining lease for mineral Marble (Minor
Mineral), Area- 1.3935 ha. was granted in favour of Shri Nirmal Kumar Patni by vide order
dated 23.08.1961 for a period of 5 years. The validity of mining lease was extended from
time to time and the same is now valid from 16.10.1961 to 31.03.2025. The lease was later on
transferred to Dr. Rashmi Patni vide order dated 11.07.2018. The lease was executed on
dated 09.10.2018 & registered on dated 28.11.2018.
The DEIAA, Jaipur vide letter dated 11.04.2017 had granted EC to Shri Nirmal
Kumar Patni for mining of Marble having production capacity of 11,394.6 TPA.
The project being one of minor mineral having lease area of 1.3935 ha., came under
the purview of the EIA Notification dated 09.09.2013 of the MoEF & CC. According to the
certificate dated 09.02.2021 of AME, Kotputli, production of mineral in the base year i.e.
2012-13 was 1060.5 Ton (Marble block) and 930.00 Ton (Marble Khanda). The production of
mineral, however, increased in the year 2013-14 and 2014-15, in comparison to base years
production level without obtaining prior EC from the regulatory authority in violation of the
EIA Notification. Production of mineral, in the subsequent years i.e. 2019-20 has been less
than the base year’s production level or as per EC granted by DEIAA vide order dated
11.04.2017. The project is therefore one of violation of the EIA Notification/ Common Cause
Judgement of the Hon’ble Supreme Court and has to be dealt with accordingly.
The PP has submitted application for ToR/ Transfer of EC in form -7, from Shri
Nirmal Kumar Patni to Dr. Rashmi Patni for Marble Mining Lease, M.L. No. 07/1961
{22/2000 (R)}, Area 1.3935 Ha., Production Capacity- 11,394.6 TPA (ROM), at Khasra No.
977, Add.- Bhaislana, Tehsil- Kotputli, District- Jaipur, (Raj.), (Proposal No.- 186593).
The project is covered under B2 category. The mining scheme in favour of Dr. Rashmi Patni
has been approved by the SME, Jaipur vide letter dated 16.10.2020. AME, Kotputli in his
certificate dated 12.01.2021 has stated that the mining lease does not fall in Aravalli hills.
DCF (WL), Jaipur in his certificate dated 24.02.2021 has stated that Jamwaramgarh WLS is
at a distance of 46.94 Km and DCF (WL), Zoo, Jaipur in his certificate dated 08.03.2021 has
stated that Nahargarh WLS is at distance of 70.0 Km from the applied lease area.
The SEAC considered the certificate dated 12.01.2021 issued by AME, Kotputli In the
certificate, it is stated that as per the MoEF & CC notification, dated 12.01.2021 is no other
mining lease within the periphery of 500 meter and therefore, there is no cluster formation.
Sh. Nirmal Kumar Patni has given no objection certificate regarding transfer of EC to
Dr. Rashmi Patni. Dr. Rashmi Patni (PP) has submitted undertaking that she will comply with
all the conditions (specific and general) laid down in the EC issued by DEIAA vide order
dated 11.04.2017.
The PP with the application for transfer of EC has not submitted report of compliance
of conditions of earlier EC as certified by the MoEF & CC/ RSPCB. The SEAC during
presentation asked the PP to submit the same at the time of final presentation of the project
for obtaining EC.
The SEAC examined the project in the light of OM dated 12.11.2020 of the MoEF &
CC. This OM provides that while considering the application for EC under violation category
Final minutes of 4.95th meeting held on 27-29 July, 2021
as per Notification dated 14.03.2017 of the MoEF & CC, the SEAC may insist upon public
hearing to be conducted only for those category of projects for which EIA Notification, 2006
itself requires public hearing to be conducted. The project, under consideration, is one of ‘B2’
category and being so does not require public hearing as per EIA Notification, 2006 read with
various OM’s and guidelines issued by the MoEF & CC, from time to time.
The SEAC, in view of the project being one of violation of the EIA notification as
also in terms of Common Cause judgment of the Hon’ble Supreme Court, decided that the PP
is required to conduct Environmental Impact Assessment Study and prepare Remediation
Plan, Natural Resource Augment Plan and Community Resource Augmentation Plan.
Keeping in view the presentation made by the PP/ Consultant and examination of
documents submitted by them, the SEAC resolved to recommend to SEIAA for prescribing
the ToR mentioned at ‘Annexure B’, as a case of violation of the EIA notification, for
preparing comprehensive EIA/EMP reports and Assessment of Ecological Damage,
preparation of Remediation Plan and Natural Community Resource Augmentation Plan as a
case of violation, of the EIA notification.
Agenda no. 53. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(19629)/ 2019-20
Project Name- Transfer of E C from Shri Lala Ram Choudhary to M/s Shri Balaji Stone
Crusher for Masonry Stone Mining Lease, M.L. No. 471/06, Area 1.0 Ha.,Production
Capacity-99000 TPA(ROM), at Khasra No. 376/1/1, 373/1, Add.- Kundala Ki Dhani,
Tehsil- Neem Ka Thana, District- Sikar, (Raj.), (Proposal No.- 180508)
Project Proponent Name- M/s Shri- Balaji Stone Crusher, Add.- 9, Leela Mention, Raj
Bhawan Road, Civil Lines, Jaipur, Distt.- Jaipur, (Raj.) Email-
Consultant Name- MANTRAS GREEN RESOURCES LTD
Hall No.- 1 NICE Sankul Plot No.- A-9, Opp. Nasik Marchant Co Op Bank Ltd, ITI Signal,
MIDCSatpur,Nasik),email:[email protected]
Observations and Resolution of the committee:-
The PP vide letter dated 29.07.2021 has submitted an application for deferment of the
case. The SEAC agreed to the request of the PP and deferred the matter. The project shall be
taken up again on receipt of his request for consideration of the project by the PP, in the
subsequent proposed meeting.
Agenda no. 54. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2(18073)/ 2019-20
Project Name: - Environmental Clearance for Marble Mineral Mining Project, Q.L. No.-
96/A, Area-0.0574 ha, Production Capacity- 2200 TPA at Khasra No.- 702, Near Village-
Ullodi Range, Tehsil- Makrana, Distt.- Nagaur, (Raj.).(Proposal No.-141385).
Project Proponent Name:- M/s Mainudeen and Brothers Makrana, Add.- Village- Makrana,
Tehsil- Makrana, Distt.- Nagaur, (Raj.)Email – [email protected]
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name:- M/s. N.S. Envro- Tech Laboratories & Consultant, Add.- Corpo
OFFICE Add Plot No. 69/318, V.T. Road Chouraha, Madhyam Marg, Mansarovar, Jaipur
(Raj.). Email:- [email protected], [email protected]
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category /Item No.(In Schedule): 1(a) B2
2 Location of Project Near village- Makrana, Tehsil- Makrana, District- Nagaur, Rajasthan.
3 Project Details ML. No. / Production
Capacity Q. L. No.-96/A
Existing Area-).0574 Ha.
Production Capacity: 2200 TPA Marble
4 Project Cost: 30.0 Lac
5 Water Requirement & Source: 2.50KLD
6 Fuel & Energy:- 0.5 KLD (HSD)
7 Application No. & Date & Document
Submitted:- Proposal No: SIA/RJ/MIN/141385/2020,
8 Information About Aravalli Certificate. Aravalli letter was issued by ME Makrana, vide
letter no. ME/Mak / Mach/2018/06, Dated-27.01.2020.
9 Date of Air/Water/Noise/Monitoring 01/01/2020 to 02/01/2020
10 Information About 500 mts Composite
Map 500 m Map was issued by ME Makrana, vide letter
no. ME/Mak/QL/Bapi -96/17/523, Dated-16.08.2017.
11 Environment Management Plan EMP Cost Capital cost 1.15 Lac and
Recurring cost – 0.85 Lac.
S. No. Particulars Capital Cost in RS.
Recurring
cost in Rs.
per years 1 Pollution control ( water
sprinkling for dust
suppression )
-- 20,000
2 Pollution monitoring (Air.
Water ,Noise, Soil) -- 15,000
3 Greenbelt Sr.
No
Particulars Amount
1 Plant 60 20,000
2 Tree guard 60 20,000
3 Water Tanker 10,000
4 Maintains &
security
10,000
Total 60,000
25,000
4 Occupation health 20,000/- 10,000 5 Miscellaneous (Fencing, etc.) 35,000/- 15,000 Total 1.15,000 0.85,000
12 Green Belt/ Plantation 0.60 Lac
Places of Plantation:- About 60 saplings will be planted in an area of 0.06 ha (33% of applied area)
upto the end of 5years,About 60 sapling will be planted out side the lease boundary at Govt. Secondary
School Matabar Makrana..
Year Along the lease
boundary
On Backfilled
area
Outside the
lease area
Top Soil Dumps Total
Area No. of Area No. of Area No. of Area No. of Area No. of
Final minutes of 4.95th meeting held on 27-29 July, 2021
(Ha.) Trees (Ha.) Trees (Ha.) Trees (Ha.) Trees (Ha.) Trees
2021-22 -- -- -- -- 0.012 12 -- -- 0.012 12
2022-23 -- -- -- -- 0.012 12
-- -- 0.012 12
2023-24 -- -- -- -- 0.012 12
-- -- 0.012 12
2024-25 -- -- -- -- 0.012 12 0.012 12
2025-26 -- -- -- --
0.012 12
0.012 12
Total -- -- -- --
0.060 60
-- - 0.060 60
As per Office Memorandum 16.01.2020: Commitment by PP The mining lease holders shall after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activates and restore the land to a condition which is for growth of fodder, Flora, Fauna etc.”
13 Budgetary Breakup For Labor Labor Welfare Capital Cost is 0.60 Lac, and
Recurring Cost is 0.30 lac.
S. No. Facility Provided for Laborers Capital Cost in RS. Recurring Cost In
RS. Per Year
1. Drinking water provided by Tanker 20,000/- 10,000/-
2. First Aid Box 5,000/- 2,000/-
3. Rest Shelter 8,000/- 4,000/-
4. Washroom Facilities for laborers 12,000/- 6,000/-
5 Safety Shoes, hand gloves, Dust mask, Ear plugs,
Helmet 10,000/- 8,000/-
6 Insurance 5,000/- --
Total 60,000/- 30,000/-
Observations of the committee:-
The SEAC considered/examined the project proposal on 29.07.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Marble Mineral Mining
Project, Q.L. No.- 96/A, Area-0.0574 ha, Production Capacity- 2200 TPA at Khasra No.-
702, Near Village- Ullodi Range, Tehsil- Makrana, Distt.- Nagaur, (Raj.)(Proposal No.-
141385).The project is covered under B2 category. The ME, Makrana has granted LOI for
mineral on 10.08.2017 and 27.07.2021 (amendment order). The mining scheme has been
approved by the SME, Ajmer vide letter dated 14.09.2017. ME, Makrana in his certificate
dated 11.09.2020 has stated that the mining lease does not fall in Aravalli hills. DCF, Nagaur
in his certificate dated 31.01.2020 has stated that there is no Wildlife Sanctuary/National
Park/ Conservation Reserve within 10 km periphery of the mine. The project does not involve
approval/ clearance under the Forest (Conservation) Act, 1980 and Wild Life Protection Act,
1972 as no forest land is involved and neither there is any Wild Life Sanctuary/ National Park
within 10 Km from the project site.
The SEAC considered the certificate dated 11.09.2020 issued by ME, Makrana. In the
certificate, it is stated that as per the MoEF & CC notification, dated 01.07.2016 there is no
other mining lease within the periphery of 500 meter and therefore, there is no cluster
formation.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Resolution:
The SEAC upon appraisal of the project in the light of information contained in Form-
1,Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, the members resolved to recommend to SEIAA for grant of EC to
M/s Mainudeen and Brothers Makrana for Marble Mineral Mining Project, Q.L. No.- 96/A,
Area- 0.0574 ha, Production Capacity- 2200 TPA at Khasra No.- 702, Near Village- Ullodi
Range, Tehsil- Makrana, Distt.- Nagaur, (Raj.).(Proposal No.-141385), with the stipulation
that the PP shall abide by the annual production scheduled specified in mining plan and that
any deviation there in will render the PP liable for legal action in accordance with
Environment and Mining Laws, with the specific and general conditions annexed at
Annexure ‘A’. Name of Proponent- M/s Mainudeen and Brothers Makrana, Add.- Village-
Makrana, Tehsil- Makrana, Distt.- Nagaur, (Raj.)Email – [email protected],
Consultant Name:- M/s. N.S. Envro- Tech Laboratories & Consultant, Add.- Corpo
OFFICE Add Plot No. 69/318, V.T. Road Chouraha, Madhyam Marg, Mansarovar, Jaipur
(Raj.). Email:[email protected], [email protected]
Final minutes of 4.95th meeting held on 27-29 July, 2021
Additional Agenda:
S.No File
No
Subject Project Proponent Name & Consultant
Name
1. 18978 Environmental Clearance for Mining
Project of Red Ochre, M.L No.
26/2018, Ref. No.2018100001233,
Mine area 2.0184 ha., production
capacity 1,57,895 TPA (ROM)
{Saleable 1,50,000 TPA and waste
7,895 TPA}, Khasra No. 366 & 367,
Near Village Kesunda, Tehsil-Chotti
Sadri & District- Pratapgrah,
Rajasthan, (Proposal No-188032)
Project Proponent Name- Sh. Bharat
Kumar Anjana S/o Sh. Ram Lal Anjana,
Add-Chotti Sadri, District-Pratapgarh
(Rajasthan), Email-
Consultant Name:- R.K. Consultants,
Add.- 17 E/777, C.H.B, Jodhpur (Raj.)
Email:- [email protected].
2. 19092 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project, Plot No. 93, Area-
1.00 Ha., with Production capacity –
80,100 TPA (ROM) {Saleable
Mineral-72,090 TPA & Waste- 8010
TPA}, Khasra No- 1, at Near village
– Kanwlai, Tehsil– Pushkar,
District– Ajmer (Rajasthan)
(Proposal No.- 195607).
Project Proponent Name:- M/s Pink City
Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur
(Raj.)
Consultant Name:-VARDAN
ENVIRONET, Add: Plot No.-82-A, Sector-
5, IMT Manesar, Gurgaon-
122003(Haryana).email:-
3. 19091 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project, Plot No. 94, Area-
1.00 Ha., Production capacity -
78,300 TPA (ROM) {Saleable
Mineral- 70,470 TPA & Waste-
7830 TPA}, Khasra No-1, at Near
village – Kanwlai, Tehsil– Pushkar,
District– Ajmer (Rajasthan).
(Proposal No.- 195667).
Project Proponent Name:- M/s Pink City
Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur
(Raj.),[email protected].
Consultant Name:- VARDAN
ENVIRONET, Add: Plot No.-82-A, Sector-
5, IMT Manesar, Gurgaon-
122003(Haryana).email:-
4. 19088 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project (Plot No.- 86, Area-
1.00 Ha) with Production Capacity-
81000 TPA (ROM) {Saleable
Mineral- 72,900 TPA & Waste-
8100 TPA}, Khasra No- 36/1402, at
Near Vill.- Kanwlai, Tehsil-
Project Proponent Name:- M/s Pink City
Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur
(Raj.)
[email protected]. Com
Consultant Name:- VARDAN
ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT
Final minutes of 4.95th meeting held on 27-29 July, 2021
Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 195072).
Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
5. 19107 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project, Plot No. 83, Area-
1.00 Ha., with Production capacity –
58,000 TPA (ROM) {Saleable
Mineral-52,200 TPA & Waste- 5800
TPA}, Khasra No- 36/1402, at Near
village – Kanwlai, Tehsil– Pushkar,
District– Ajmer (Rajasthan)
(Proposal No.- 195311).
Project Proponent Name:- M/s Pink City
Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur
(Raj.), [email protected].
Consultant Name:- VARDAN
ENVIRONET Add: Plot No.-82-A, Sector-
5, IMT Manesar, Gurgaon-122003
(Haryana).email:-
6. 19089 Environmental Clearance for
Masonry Stone (Minor Mineral)
Mining Project, Plot No.- 84, Area-
1.00 Ha, with Production Capacity-
58,000 TPA (ROM) {Saleable
Mineral- 52,200 TPA & Waste-
5800 TPA}, Khasra No- 36/1402, at
Near Vill.- Kanwlai, Tehsil-
Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 194897).
Project Proponent Name:- M/s Pink City
Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur
(Raj.), [email protected].
Com
Consultant Name:- VARDAN
ENVIRONET Add: Plot No.-82-A, Sector-
5, IMT Manesar, Gurgaon-122003
(Haryana). email:-
7. 15602 Application for expansion in
production capacity from 50,000
TPA - 12,61,730 MTPA of Quartz,
Feldspar, Calcite and inclusion of
Masonry Stone mining project along
with Mineral Grinding Unit/Crusher
at mine lease of 12,61,730 TPA
capacity in total, M.L.- 34/04, Area-
20.0 ha., Khasra no. 1, 3, 47, 49, 56,
34 to 39, 50 to 52 of Village
Atbhigha; Khasra no. 96, 97, 93, 94
of village Chak basdi; Khasra no.
60, 69, 71, 70, 70/471, 67, 68, 66
and 70 of village Chak Khandela;
Khasra no. 65/1, 65/2, 66, 66/170 of
village Khandela basdi and Khasra
no. 2, 11/305 of village Charanwas
at near Village- Atbhigha, Tehsil-
Khandela, District- Sikar, State-
Rajasthan (Proposal no - 75949).
Project Proponent Name:- M/s Reverence
Mines & Minerals Pvt. Ltd., Sh. Anil Gupta,
Director and Authorized Signatory Sh. Inder
Kumar, Add-A-28, Anita Colony, Bajaj
Nagar, Jaipur, E-Mail-
Consultant Name:- TEAM Institute of
Science & Technology Pvt. Ltd.,E-
65,Chitranjan marg, C-Scheme, Jaipur.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Additional Agenda no. 01. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat. B2 (18978)/
2019-20
Project Name: - Environmental Clearance for Mining Project of Red Ochre, M.L No.
26/2018, Ref. No.2018100001233, Mine area 2.0184 ha., production capacity 1,57,895 TPA
(ROM) {Saleable 1,50,000 TPA and waste 7,895 TPA}, Khasra No. 366 & 367, Near Village
Kesunda, Tehsil-Chotti Sadri & District- Pratapgrah, Rajasthan, (Proposal No-188032)
Project Proponent Name- Sh. Bharat Kumar Anjana S/o Sh. Ram Lal Anjana, Add-Chotti
Sadri, District-Pratapgarh (Rajasthan), [email protected].
Consultant Name:- R.K. Consultants, Add.- 17 E/777, C.H.B, Jodhpur (Raj.) Email:-
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.
(in Schedule):
1(a) B2
S.No. in Agenda- 66
2. Location of Project Village –Kesunda Tehsil–Chotti Sadri
District– Pratapgarh(Raj.) Latitude&Longitude
S.No. Latitude Longitude
A 24027’43.5335” 74048’33.3541”
B 24027’43.6055” 74048’32.7442”
C 24027’48.7981” 74048’33.4171”
D 24027’51.2209” 74048’32.2892”
E 24027’51.2858” 74048’34.2417”
F 24027’50.4638” 74048’36.1746”
G 24027’48.4488” 74048’38.5418”
H 24027’47.4217” 74048’36.5238”
I 24027’45.3519” 74048’35.1151”
3. Project Details
Lease No. /Production
capacity
Ref. No. 2018100001233, ML No. 26/2018
Khasra No. 366 & 367, Area-2.0184Hect.
Production –157895 TPA ROM Red Ocher
{(95% Saleable Mineral= 150000 TPA & 5% Mineral Waste-= 7895 TPA)}
(Mentioned on Page no-1 of FORM-1)
4. Project Cost: Rs. 70.0Lacs
5. Water Requirement
& Source
Total water requirement is about 2-3KLD
6. Fuel &Energy: - Only diesel will be required to run vehicles for transportation. No electricity will be needed in
the proposed project.
Final minutes of 4.95th meeting held on 27-29 July, 2021
7. Reference No. &
Date & documents
submitted: -
Ref. No. Nil&NA
Documents- Form-1, PFR & Approved mining plan with Annexure
8. Information about
Aravalli Certificate.
Area is not falling in Aravalli Hill Ranges issued by DMGPratapgarh vide letter
No.ME/Pratap/CC-Minor/ML/26/2018/2020-21/7650 dated 03.12.2020 (Letter enclosed with Checklist.)
9 Date of Air/Water/ Noise Monitoring
05.11.2020 (Test Reports enclosed with Checklist.)
10 Information about
500 mts composite map
Total lease area within 500 mts is 2.0184 hect. issued by DMG, Pratapgarhvide letter no.
ME/Pratap/CC-Minor/ML/26/2018/2020-21/7649 dated 03.12.2021 & Cluster map vide map no. ME/PRG/DRG/96 dated 02.12.2021
(Cluster Map& Certificate enclosed with Checklist.)
11 Environment Management Plan
Expenditure of EMP Rs3,00,000/-
S.No. Particulars Amount (in Rs./Year)
1. Pollution Control Air (water sprinkling for dust suppression) 40000/-
2. Pollution Monitoring
a. Air sampling stations & analysis b. Water Quality Analysis
c. Noise & Vibration Monitoring d. Soil Quality Analysis
60000/-
3. Greenbelt development (Tree Guards, Re-sapling Plantation & Its
Maintenance etc.) 70000/-
4 Progressive reclamation of Mine Pit 50000/-
5 Maintenance of approach Road 50000/-
6 Occupational Health & Safety 30000/-
TOTAL 3,00,000/-
12 CSR /ESR Activates
Expenditure of CSR Rs1,00,000/-
13 Green Belt/ Plantation
Expenditure of Green Belt Rs. 70,000/-
Year Peripheral area outside Area Total Type of plants
Area (Ha.) Trees Area (Ha.)
Trees Area (Ha.)
Trees Neem, Flower, Gulmohor, Kanjari, Lemonand similar type of species which can grow easily in this area.
Ist year 0.2231 220 - - 0.2231 220
IInd year 0.2 200 - - 0.2 200
IIIrd year - - 0.1369 135 0.1369 135
IVth year - - 0.1 100 0.1 100 Total 0.4231 420 0.2369 235 0.66 655
Note:-As per O.M. dated 16.01.2020 “The Mining Lease holders shall, after ceasing mining operations, undertake
re-grassing the mining area and any other area which may have been disturbed due to their mining activities and
restore the land to a condition which is fit for growth of fodder, flora, fauna etc.”
Total 0.66-hectare area will be covered under the plantation in which 0.4231 ha will be done on Boundary Barrier &
0.2369 ha will be done on Outside the Applied area within own land khasra No. no. 367.
Final minutes of 4.95th meeting held on 27-29 July, 2021
14 Budgetary
Breakup for
Labour
Expenditure of Labor Rs60,000/-
Particulars Total Expenditure as proposed by Project
Proponent
Rest Shelters Rs. 10,000/-
Medical aid for the laborers and their families Rs. 10000/-
Provision of Drinking water Rs. 6500/-
Provision for clean sanitation for laborers and their families Rs. 8000/-
Provision for Educational facilities for children etc. Rs. 8000/-
Fuel for cooking Rs. 8500/-
Creche Rs. 4000/-
Recreation Rs. 5000/-
Total Rs. 60,000/-
15 Present Status: - Fresh LOI Area
Brief details of the project:-
The SEAC considered/examined the project proposal on 29.04.2021 by way of VC in
accordance with letter dated 27.05.2020 of SEIAA, Rajasthan in the presence of PP and his
Consultant.
The PP has submitted application for Environmental Clearance for Mining Project of
Red Ochre, M.L No. 26/2018, Ref. No.2018100001233, Mine area 2.0184 ha., production
capacity 1,57,895 TPA (ROM) {Saleable 1,50,000 TPA and waste 7,895 TPA}, Khasra No.
366 & 367, Near Village Kesunda, Tehsil- Chotti Sadri & District- Pratapgrah, Rajasthan,
(Proposal No-188032).
The project is covered under B2 category. The ADM, Udaipur vide order dated
21.09.2020 has issued LoI to the PP for mining of Red Ochre. The mining plan has been
approved by the SME, Udaipur vide letter dated 27.10.2020. ME, Pratapgarh in his certificate
dated 03.12.2020 has stated that the mining lease does not fall in Aravalli hills.
As per cluster certificate dated 03.12.2020 issued by ME, Pratapgarh, the total area of
all the mining leases in the cluster is 2.0184 ha.
DCF (WL), Chittorgarh in his certificate dated 26.11.2020 has stated that Sitamata
WLS is at distance of 22.0 Km from the proposed lease area from the applied lease area. The
PP in form 1 has stated that the boundary of the State of MP is at a distance of 1.10 Km from
the applied lease area.
Since the 10 km distance from the applied lease area extends to MP state also, the
SEAC asked the PP to submit certificate from competent authority of the forest department of
Final minutes of 4.95th meeting held on 27-29 July, 2021
the State of Mdhya Pradesh, regarding existence or otherwise of National Park or Wildlife
Sanctuary within 10 km from the applied lease area within a period of 45 days failing which
the proposal shall be recommended to SEIAA for closure & delistment.
Observations and Resolution of the committee:-
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated nil received on 20.07.2021. The SEAC in its 4.95th meeting
held on 27-29 July, 2021 went through the reply. The PP incompliance of the query has
submitted letter of DCF (WL), Chittorgarh in his certificate dated 26.11.2020 has stated that
Sitamata WLS is at distance of 22.0 Km from the proposed lease area from the applied lease
area. The PP in form 1 has stated that the boundary of the State of MP is at a distance of 1.10
Km from the applied lease area.
The PP has also submitted copy of letter written by Up Van Mandal Adhikari, Up Van
Mandal, Neemuch to Van Mandal Adhikari, Van Mandal, Neemuch dated 09.07.2021, which
stated that there is no National Park/ Wildlife Sanctuary within 10 Km from the applied lease
area and nearest forest block Kasbi is at about 13.25 Kms.
The SEAC upon appraisal of the project in the light of information contained in Form-
1, Form-2, Pre-feasibility report and other documents and having regard to the submissions
made during presentation, the members resolved to recommend to SEIAA for grant of EC to
Shri Bharat Kumar Anjana S/o Sh. Ram Lal Anjana, for Mining Project of Red Ochre, M.L
No. 26/2018, Ref. No.2018100001233, Mine area 2.0184 ha., production capacity 1,57,895
TPA (ROM) {Saleable 1,50,000 TPA and waste 7,895 TPA}, Khasra No. 366 & 367, Near
Village Kesunda, Tehsil-Chotti Sadri & District- Pratapgrah, Rajasthan, (Proposal No-
188032), with the stipulation that the PP shall abide by the annual production scheduled
specified in mining plan and that any deviation there in will render the PP liable for legal
action in accordance with Environment and Mining Laws, with the specific and general
conditions annexed at Annexure ‘A’. Project Name: - Environmental Clearance for Mining
Project of Red Ochre, M.L No. 26/2018, Ref. No.2018100001233, Mine area 2.0184 ha.,
production capacity 1,57,895 TPA (ROM) {Saleable 1,50,000 TPA and waste 7,895 TPA},
Khasra No. 366 & 367, Near Village Kesunda, Tehsil-Chotti Sadri & District- Pratapgrah,
Rajasthan, (Proposal No-188032), Project Proponent Name- Sh. Bharat Kumar Anjana S/o
Sh. Ram Lal Anjana, Add-Chotti Sadri, District-Pratapgarh (Rajasthan), Email-
Additional Agenda no. 02. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.1(a)
B2(19092)/ 2019-20
Project Name:- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project, Plot No. 93, Area- 1.00 Ha., with Production capacity – 80,100 TPA (ROM)
{Saleable Mineral-72,090 TPA & Waste- 8010 TPA}, Khasra No- 1, at Near village –
Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan) (Proposal No.- 195607).
Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-Scheme,
Gopalpura, Bypass, Distt.- Jaipur (Raj.)
Final minutes of 4.95th meeting held on 27-29 July, 2021
Consultant Name:-VARDAN ENVIRONET, Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003(Haryana).email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.(in Schedule): B-2/1(a)
2. Location of Project Near village – Kanwlai, Tehsil– Pushkar, District–
Ajmer(Rajasthan)
3. Project Details
M.L. No. /Production capacity
Masonry Stone (Minor Mineral) Mining Project” (Plot No.
93, Area- 1.00 Ha.) with Production capacity -80100 TPA
(ROM) {Saleable Mineral-72090 TPA & Waste-8010 TPA}
at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer
(Rajasthan) by M/s Pink City Commercial Pvt. Ltd.
Khasra No- 01
4. Project Cost Rs50 Lakhs
5. Water Requirement
& Source
2.5 KLD (Tanker Water Supply from nearby village)
6. Fuel & Energy 180 Litres/day HSD Fuel will be required for mine
machineries.
7. Application No. & Date &
documents submitted
Proposal No. - SIA/RJ/MIN/195607/2021 dated 4.02.21
8 Information about Aravalli
Certificate
ME/AJ/COMPOSIT/MACHI/ ARAVALLI PRA-/35 Dated
22/01/2021
Date of Air/Water/Noise
Monitoring
Environment Monitoring was carried out by NABL
approved laboratory.
9 Information about Topo-sheet
map
45 J 10
Environment Sensitivity:-
1 Nearest Village Kanwlai (~1.1 km in SW direction)
2 Nearest Railway Station Makarwadi Halt Railway station (~7.7 Km, SE direction)
3 Nearest Airport Kishangarh Airport, Ajmer (~22.8 Km, E direction)
4 Nearest National / State
Highway
N.H.89 is ~ 9.7 km ,in SW direction.
N.H.8 is ~ 14.9 km ,in SE direction.
S.H.60 is 13.8 km ,in W direction.
S.H.59 is ~ 14.5km ,in NW direction.
5 Archaeological Important
Place
No any Archaeological Important Place found within 15
km distance from the periphery of lease area.
6 Ecological Sensitive Park,
Wildlife Sanctuary, Reserve
etc.
No any Ecological Sensitive Park, Wildlife Sanctuary,
Reserve etc. found within 15 km distance from the
periphery of lease area.
7 Nearest River / water body SaraswatiNadi is ~ 1.6 km, in S direction.
NaharNadi is ~ 6.3 km, in SE direction.
PhulSagar is ~ 10.8 km, in SE direction.
Ana sagar is ~ 13.9 km, in S direction
Pushkar Lake is ~ 13.6 km, in S direction.
KansiyaBala is ~ 4.2 km, in NW direction.
PalriNadi is ~ 14.3 km, in N direction.
8 Reserved/Protected Forests PadampurDungar P.F is ~3.7 km ,in SE direction.
KarelGhati P.F. is ~1.0 km in W direction MakarwaliHokran R.F is ~7.2 km in SE direction.
DuletGhati R. F. is ~7.3 km ,in SW direction
Mahavir R.F is ~12.3 km ,in SE direction.
Final minutes of 4.95th meeting held on 27-29 July, 2021
Manpur Ki Dhani R.F is ~ 14.2 km ,in E direction.
Pilwa R.F. is ~ 9.1 km ,in N direction
Ghinwali P.F is ~ 12.6 km ,in N direction.
10 Environment Management Plan
S.No. PARTICULAR
CAPITAL
COST
(IN RS.)
RECURRING
COST
(IN RS./YEAR)
1 Water sprinkle facility on haul roads to
prevent dust suppression. - 25,000/-
2 Maintenance of approach road - 80,000/-
3 Pollution Monitoring of Ambient Air, Noise,
Water & Soil Quality - 30,000
4 Plantation/Green Belt & maintenance 3,50,000/- 90,000
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 45,000/-
7 Provision of PPES (helmet shoes gloves
goggles etc.) - 15,000/-
9 Emergency rescue fire fightingequipments
and first aid 30,000/- 30,000/-
10 Caution board (will illustrate lease detail and
name of the PHC and contact no. of doctor) 20,000/- 15,000
11 Solar pole with LED light @ 8000/- Per Light 50,000/- 10,000/-
TOTAL 5,50,000/- 3,50,000/-
12 Green Belt/ Plantation
Year (Outside the lease area in Khasra
No. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer)
(Outside haul roads)
Top Soil Dumps Total
Area (Ha.) No. of Trees
Area (Ha.
No. Of Trees
Area (Ha.)
No. Of Trees
Area (Ha.) No. Of Trees
Existing - - - - - - 0.11 110
I 0.11 110 - - - - 0.11 110
II 0.11 110 - - - - 0.11 110
III 0.11 110 - - - -
IV Maintenance - - - - Maintenance
V
Total 0.33 330 0.33 330
Annual expenditure: Rs 90,000/- Total 330 saplings will be planted in upcoming 3 years and Area for
plantation is 0.33 Ha will be done outside the lease area in Khasra no. 124/1617, 39 & 99 of village
Kanwlai, Tehsil Pushkar, District-Ajmer
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area
and any other area which may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20
13 Budgetary Breakup for Labour
Sr. No. Description
Capital
Cost
(in Rs.)
Recurring Cost
(in Rs./Yr.)
1 Rest Shelter 45,000 2,000
2 Drinking water facility 10,000 5,000
3 Toilet Facility (2 units for Male &
Female) 10,000 5,000
4 Fuel for cooking - 8,000
5 Medical facility for labors - 15,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
Total 65,000 35,000
14 Present Status New Mining lease
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
The PP has submitted application for Environmental Clearance for Masonry Stone
(Minor Mineral) Mining Project, Plot No. 93, Area- 1.00 Ha., with Production capacity –
80,100 TPA (ROM) {Saleable Mineral-72,090 TPA & Waste- 8010 TPA}, Khasra No- 1, at
Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan) (Proposal No.-
195607). The project is covered under B2 category. The SME, Ajmer vide order dated
18.12.2020 has issued LoI to the PP for mining of Masonry Stone (Cheja Patther). The
mining plan has been approved by the SME, Ajmer vide letter dated 21.01.2021. ME, Ajmer
in his certificate dated 22.01.2021 has stated that the mining lease does not fall in Aravalli
hills.
According to the certificate dated 22.01.2021, issued by ME, Ajmer, there is no
cluster formation in terms of notification dated 15.01.2016 and 01.07.2016 of the MoEF &
CC.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Observations and Resolutions of the Committee:
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated 30.06.2021. The SEAC, in its 4.95th meeting held on 27-29
July, 2021 went through the reply. Incompliance of the query the PP has submitted copy of
certificate dated 27.05.2021 of DCF, Ajmer stating that there is no National Park/ Wildlife
Sanctuary within 10 Km from plot no. 82, 83, 84, 86, 86, 88, 90, 91, 92, 93, 94 (total 11
plots) (LOI).
Keeping in view the information contained in the documents submitted by the PP and
presentation made by him before the SEAC and after detailed deliberations, the members
resolved to recommend to SEIAA for the grant of EC to M/s Pink City Commercial Pvt. Ltd.
for Masonry Stone (Minor Mineral) Mining Project, Plot No. 93, Area- 1.00 Ha., with
Production capacity – 80,100 TPA (ROM) {Saleable Mineral-72,090 TPA & Waste- 8010
TPA}, Khasra No- 1, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer
(Rajasthan) (Proposal No.- 195607), with the stipulation that the PP shall abide by the annual
production scheduled specified in mining plan and that any deviation there in will render the
PP liable for legal action in accordance with Environment and Mining Laws, with the specific
and general conditions annexed at Annexure ‘A’. Project Name:- Environmental Clearance
for Masonry Stone (Minor Mineral) Mining Project, Plot No. 93, Area- 1.00 Ha., with
Production capacity – 80,100 TPA (ROM) {Saleable Mineral-72,090 TPA & Waste- 8010
Final minutes of 4.95th meeting held on 27-29 July, 2021
TPA}, Khasra No- 1, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer
(Rajasthan) (Proposal No.- 195607), Project Proponent Name:- M/s Pink City Commercial
Pvt. Ltd. Add.- B-219, B-Scheme, Gopalpura, Bypass, Distt.- Jaipur (Raj.) Email-
[email protected], Consultant:- VARDAN ENVIRONET Add: Plot No.-82-A,
Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana). email:- [email protected].
Additional Agenda no. 03. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.
1(a)B2(19091)/ 2019-20
Project Name:- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project, Plot No. 94, Area- 1.00 Ha., Production capacity -78,300 TPA (ROM) {Saleable
Mineral- 70,470 TPA & Waste- 7830 TPA}, Khasra No-1, at Near village – Kanwlai, Tehsil–
Pushkar, District– Ajmer (Rajasthan). (Proposal No.- 195667).
Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-Scheme,
Gopalpura, Bypass, Distt.- Jaipur (Raj.),[email protected].
Consultant Name:- VARDAN ENVIRONET, Add: Plot No.-82-A, Sector- 5, IMT
Manesar, Gurgaon-122003(Haryana).email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.(in
Schedule):
B-2
2. Location of Project Near village – Kanwlai, Tehsil– Pushkar, District–
Ajmer(Rajasthan)
3. Project Details
M.L. No. /Production capacity
“Masonry Stone (Minor Mineral) Mining Project” (Plot
No. 94, Area- 1.00 Ha.) with Production capacity -78300
TPA (ROM) { Saleable Mineral-70470 TPA & Waste-
7830 TPA} at Near village – Kanwlai, Tehsil– Pushkar,
District– Ajmer (Rajasthan) by M/s Pink City
Commercial Pvt. Ltd.
Khasra No-1
4. Project Cost Rs50 Lakhs
5. Water Requirement & Source
2.5 KLD (Tanker Water Supply from nearby village)
6. Fuel & Energy 150 Litres/day HSD Fuel will be required for mine
machineries.
7. Application No. & Date & documents submitted
Proposal No. - SIA/RJ/MIN/195667/2021 Dated 02/02/2021
8 Information about Aravalli
Certificate
ME/AJ/COMPOSIT/MACHI/ ARAVALLI PRA-/37
Dated 22/01/2021
Date of Air/Water/Noise Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
9 Information about Topo-sheet
map
45 J 10
Environment Sensitivity:-
1 Nearest Village Kanwlai (~1.1 km in SW direction)
Final minutes of 4.95th meeting held on 27-29 July, 2021
2 Nearest Railway Station Makarwadi Halt Railway station (~7.7 Km, SE direction)
3 Nearest Airport Kishangarh Airport, Ajmer (~22.8 Km, E
direction)
4 Nearest National / State Highway N.H.89 is ~ 9.7 km,in SW direction.
N.H.8 is ~ 14.9 km,in SE direction.
S.H.60 is 13.8 km,in W direction.
S.H.59 is ~ 14.5km,in NW direction.
5 Archaeological Important Place No any Archaeological Important Place within
15 km distance from the periphery of lease area.
6 Ecological Sensitive Park, Wildlife Sanctuary, Reserve etc.
No any Ecological Sensitive Park, Wildlife Sanctuary, Reserve etc.within 15 km distance
from the periphery of lease area.
7 Nearest River / water body SaraswatiNadi is ~ 1.6 km, in S direction.
NaharNadi is ~ 6.3 km, in SE direction. PhulSagar is ~ 10.8 km, in SE direction.
Ana sagar is ~ 13.9 km, in S direction
Pushkar Lake is ~ 13.6 km, in S direction. KansiyaBala is ~ 4.2 km, in NW direction.
PalriNadi is ~ 14.3 km, in N direction.
8 Reserved/Protected Forests Reserved/Protected Forests found within 15
km radius of mine site:
PadampurDungar P.F is ~3.7 km,in SE direction.
KarelGhati P.F. is ~1.0 km in W direction
MakarwaliHokran R.F is ~7.2 km in SE
direction. DuletGhati R. F. is ~7.3 km,in SW direction
Mahavir R.F is ~12.3 km,in SE direction.
Manpur Ki Dhani R.F is ~ 14.2 km,in E direction.
Pilwa R.F. is ~ 9.1 km,in N direction.
Ghinwali P.F is ~ 12.6 km,in N direction.
10 Environment Management Plan
S.No. PARTICULAR
CAPITAL
COST
(IN RS.)
RECURRING
COST
(IN RS./YEAR)
1 Water sprinkle facility on haul roads to
prevent dust suppression. - 25,000/-
2 Maintenance of approach road - 80,000/-
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality
- 30,000
4 Plantation/Green Belt & maintenance 3,50,000/- 90,000
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 45,000/-
7 Provision of PPES (helmet shoes gloves
goggles etc.) - 15,000/-
9 Emergency rescue fire fighting equipments
and first aid 30,000/- 30,000/-
10
Caution board (will illustrate lease detail
and name of the PHC and contact no. of
doctor)
20,000/- 15,000
11 Solar pole with LED light @ 8000/- Per 50,000/- 10,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
Light
TOTAL 5,50,000/- 3,50,000/-
12 Green Belt/ Plantation Year (Outside the lease area in
Khasra No. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer)
(Outside haul roads)
Top Soil Dumps Total
Area (Ha.) No. of Trees
Area (Ha.
No. Of Trees
Area (Ha.)
No. Of Trees
Area (Ha.)
No. Of Trees
Existing - - - - - - 0.11 110
I 0.11 110 - - - - 0.11 110
II 0.11 110 - - - - 0.11 110
III 0.11 110 - - - -
IV Maintenance - - - - Maintenance
V Total 0.33 330 0.33 330
Annual expenditure: Rs 90,000/- Total 330 saplings will be planted in upcoming 3 years and Area for
plantation is 0.33 Ha will be done outside the lease area in Khasra no. 124/1617, 39 & 99 of village
Kanwlai, Tehsil Pushkar, District-Ajmer
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area
and any other area which may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20
13 Budgetary Breakup for Labour
Sr. No. Description Capital Cost
(in Rs.)
Recurring Cost
(in Rs./Yr.)
1 Rest Shelter 45,000 2,000
2 Drinking water facility 10,000 5,000
3 Toilet Facility (2 units for Male &
Female) 10,000 5,000
4 Fuel for cooking - 8,000
5 Medical facility for labors - 15,000
Total 65,000 35,000
14 Present Status New Mining lease
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
The PP has submitted application for Masonry Stone (Minor Mineral) Mining Project, Plot
No. 94, Area- 1.00 Ha., Production capacity -78,300 TPA (ROM) {Saleable Mineral- 70,470
TPA & Waste- 7830 TPA}, Khasra No-1, at Near village – Kanwlai, Tehsil– Pushkar,
District– Ajmer (Rajasthan). (Proposal No.- 195667). The project is covered under B2
category. The SME, Ajmer vide order dated 18.12.2020 has issued LoI to the PP for mining
of Masonry Stone (Cheja Patther). The mining plan has been approved by the SME, Ajmer
vide letter dated 21.01.2021. ME, Ajmer in his certificate dated 22.01.2021 has stated that the
mining lease does not fall in Aravalli hills.
According to the certificate dated 22.01.2021, issued by ME, Ajmer, there is no
cluster formation in terms of notification dated 15.01.2016 and 01.07.2016 of the MoEF &
CC.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Observations and Resolutions of the Committee:
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated 30.06.2021. The SEAC, in its 4.95th meeting held on 27-29
July, 2021 went through the reply. Incompliance of the query the PP has submitted copy of
certificate dated 27.05.2021 of DCF, Ajmer stating that there is no National Park/ Wildlife
Sanctuary within 10 Km from plot no. 82, 83, 84, 86, 86, 88, 90, 91, 92, 93, 94 (total 11
plots) (LOI).
Keeping in view the information contained in the documents submitted by the PP and
presentation made by him before the SEAC and after detailed deliberations, the members
resolved to recommend to SEIAA for the grant of EC to M/s Pink City Commercial Pvt. Ltd.
for Masonry Stone (Minor Mineral) Mining Project, Plot No. 94, Area- 1.00 Ha., Production
capacity -78,300 TPA (ROM) {Saleable Mineral- 70,470 TPA & Waste- 7830 TPA}, Khasra
No-1, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan). (Proposal
No.- 195667), with the stipulation that the PP shall abide by the annual production scheduled
specified in mining plan and that any deviation there in will render the PP liable for legal
action in accordance with Environment and Mining Laws, with the specific and general
conditions annexed at Annexure ‘A’. Project Name:- Environmental Clearance for Masonry
Stone (Minor Mineral) Mining Project, Plot No. 94, Area- 1.00 Ha., Production capacity -
78,300 TPA (ROM) {Saleable Mineral- 70,470 TPA & Waste- 7830 TPA}, Khasra No-1, at
Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan). (Proposal No.-
195667). Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-
Scheme, Gopalpura, Bypass, Distt.- Jaipur (Raj.),[email protected].
Consultant Name:- VARDAN ENVIRONET, Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003(Haryana).email:- [email protected].
Additional Agenda no. 04. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.
1(a)B2(19088)/ 2019-20
Project Name:- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project (Plot No.- 86, Area- 1.00 Ha) with Production Capacity- 81000 TPA (ROM)
{Saleable Mineral- 72,900 TPA & Waste- 8100 TPA}, Khasra No- 36/1402, at Near Vill.-
Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.) (Proposal No.- 195072).
Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-Scheme,
Gopalpura, Bypass, Distt.- Jaipur (Raj.)
[email protected]. Com
Consultant Name:- VARDAN ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
Final minutes of 4.95th meeting held on 27-29 July, 2021
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1 Category / Item no.(in
Schedule):
1(a)B2
2. 2 Location of Project Near village – Kanwlai, Tehsil– Pushkar, District – Ajmer (Rajasthan)
3. 3 Project Details PlotNo./Area/Production
capacity/Khasra No.
Plot No.-86
Area – 1.0Ha.
Production capacity -81000 TPA (ROM)
[Saleable Mineral-72900 TPA &Waste- 8100 TPA]
Khasra No.-36/1402
4. ` Project Cost Rs. 60Lakhs
5. 5 Water Requirement
& Source
2.5 KLD (Tanker Water Supply from nearby village)
6. 6 Fuel & Energy 150Litres/day HSD Fuel will be required for mine machineries.
7. 7 Application No.& Date &
documents submitted
Hard Copy Submitted to SEIAA, Rajasthan SIA/RAJ/MIN/195072/2021on
dated 28-01-2021
8. 8 Information about Aravalli
Certificate
ME/Aj/Composite/Machi/AravaliPra-/23, dated- 22.01.2021
9. 9 Date of Air/Water/Noise
Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
10. Information about Topo-
sheet map
45 J 10
11. Environment Sensitivity
1 Nearest Village Kanwlai (~0.5 km in South direction)
2 Nearest Railway Station Makarwadi Halt Railway station (~7.5 Km, SE direction)
3 Nearest Airport Kishangarh Airport, Ajmer (~22.9 Km, SE direction)
4 Nearest National / State Highway N.H.89 (~8.9 km, SW)
S.H.60 (~13.1 km, West)
S.H.59 (~14.5km, NW)
N.H.8 (~14.9 km, SE)
5 Archaeological Important Place No any Archaeological Important Place found within 15 km
distance from the periphery of lease area.
6 Ecological Sensitive Park, Wildlife
Sanctuary, Reserve etc.
No any Ecological Sensitive Park, Wildlife Sanctuary, Reserve
etc. found within 15 km distance from the periphery of lease area.
7 Nearest River / water body SaraswatiNadi (~0.6 Km, South)
KansiyaBala (~4.2 km , NW)
NaharNadi (~6.3 km ,SE)
PhulSagar (~10.8 km, SE)
Pushkar Lake (~12.8km ,South)
Anasagar (~13.3 km, South)
PalriNadi (~14.7 km, North)
8 Reserved/Protected Forests KarelGhati P.F. (~0.8 km , West)
PadampurDungar P.F (~3.7 km ,SE) DuletGhati R. F. (~6.5 km , SW)
MakarwaliHokran R.F (~6.9 km ,SE)
Pilwa R.F. (~10.0 km ,North)
Mahavir R.F (~11.6 km ,SE)
Manpur Ki Dhani R.F (~14.5 km ,East)
Ghinwali P.F (~13.6 km ,North)
Final minutes of 4.95th meeting held on 27-29 July, 2021
12. 1 Environment Management Plan
S.No. PARTICULAR CAPITAL COST
(IN RS.)
RECURRING COST
(IN RS./YEAR)
1 Water sprinkle facility on haul roads to prevent dust suppression.
- 25,000/-
2 Maintenance of approach road - 80,000/-
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality
- 30,000
4 Plantation/Green Belt & maintenance 3,50,000/- 90,000
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 45,000/-
7 Provision of PPES (helmet shoes gloves goggles etc.) - 15,000/-
9 Emergency rescue fire fighting equipments and first aid
30,000/- 30,000/-
10 Caution board (will illustrate lease detail and name of the PHC and contact no. of doctor)
20,000/- 15,000
11 Solar pole with LED light @ 8000/- Per Light 50,000/- 10,000/-
TOTAL 5,50,000/- 3,50,000/-
13. 1 Green Belt/ Plantation
Year (Outside the lease area in Khasra
No. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer)
(Outside haul roads)
Top Soil Dumps Total
Area (Ha.) No. of Trees
Area (Ha.
No. Of Trees
Area (Ha.)
No. Of Trees
Area (Ha.) No. Of Trees
Existing - - - - - - 0.11 110
I 0.11 110 - - - - 0.11 110
II 0.11 110 - - - - 0.11 110
III 0.11 110 - - - -
IV Maintenance - - - - Maintenance
V
Total 0.33 330 0.33 330
Annual expenditure: Rs 90,000/- Total 330 saplings will be planted in upcoming 3 years and Area for plantation is 0.33 Ha will be done outside the lease area in Khasra no. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area and any other area which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20
14. 1 Budgetary Breakup for Labour Sr. No. Description Capital Cost
(in Rs.) Recurring Cost
(in Rs./Yr.)
1 Rest Shelter 45,000 3,000
2 Drinking water facility 20,000 2,000
3 Toilet Facility (2 units for Male & Female)
10,000 3,000
4 Fuel for cooking - 12,000
5 Medical facility for labors - 15,000
Total 75,000 35,000
15. 1 Present Status
New Mining Project
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
Final minutes of 4.95th meeting held on 27-29 July, 2021
The PP has submitted application for Environmental Clearance for Masonry Stone
(Minor Mineral) Mining Project (Plot No.- 86, Area- 1.00 Ha) with Production Capacity-
81000 TPA (ROM) {Saleable Mineral- 72,900 TPA & Waste- 8100 TPA} Khasra No-
36/1402 at Near Vill.- Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.) (Proposal No.-
195072). The project is covered under B2 category. The SME, Ajmer vide order dated
18.12.2020 has issued LoI to the PP for mining of Masonry Stone (Cheja Patther). The
mining plan has been approved by the SME, Ajmer vide letter dated 21.01.2021. ME, Ajmer
in his certificate dated 22.01.2021 has stated that the mining lease does not fall in Aravalli
hills.
According to the certificate dated 22.01.2021, issued by ME, Ajmer, there is no cluster
formation within the periphery of 500 meter from the applied lease area in terms of
notification dated 15.01.2016 and 01.07.2016 of the MoEF & CC.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Observations and Resolutions of the Committee:
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated 30.06.2021. The SEAC, in its 4.95th meeting held on 27-29
July, 2021 went through the reply. Incompliance of the query the PP has submitted copy of
certificate dated 27.05.2021 of DCF, Ajmer stating that there is no National Park/ Wildlife
Sanctuary within 10 Km from plot no. 82, 83, 84, 86, 86, 88, 90, 91, 92, 93, 94 (total 11
plots) (LOI).
Keeping in view the information contained in the documents submitted by the PP and
presentation made by him before the SEAC and after detailed deliberations, the members
resolved to recommend to SEIAA for the grant of EC to M/s Pink City Commercial Pvt. Ltd.
for Masonry Stone (Minor Mineral) Mining Project (Plot No.- 86, Area- 1.00 Ha) with
Production Capacity- 81,000 TPA (ROM) {Saleable Mineral- 72,900 TPA & Waste- 8100
TPA}, Khasra No- 36/1402, at Near Vill.- Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 195072), with the stipulation that the PP shall abide by the annual production
scheduled specified in mining plan and that any deviation there in will render the PP liable
for legal action in accordance with Environment and Mining Laws, with the specific and
general conditions annexed at Annexure ‘A’. Project Name:- Environmental Clearance for
Masonry Stone (Minor Mineral) Mining Project (Plot No.- 86, Area- 1.00 Ha) with
Production Capacity- 81000 TPA (ROM) {Saleable Mineral- 72,900 TPA & Waste- 8100
TPA}, Khasra No- 36/1402, at Near Vill.- Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 195072). Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd.
Add.- B-219, B-Scheme, Gopalpura, Bypass, Distt.- Jaipur (Raj.)
[email protected]. Com, Consultant Name:- VARDAN ENVIRONET
Add: Plot No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).
email:- [email protected].
Final minutes of 4.95th meeting held on 27-29 July, 2021
Additional Agenda no. 05. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.
1(a)B2(19107)/ 2019-20
Project Name:- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project, Plot No. 83, Area- 1.00 Ha., with Production capacity – 58,000 TPA (ROM)
{Saleable Mineral-52,200 TPA & Waste- 5800 TPA}, Khasra No- 36/1402, at Near village –
Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan) (Proposal No.- 195311).
Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-Scheme,
Gopalpura, Bypass, Distt.- Jaipur (Raj.), [email protected].
Consultant Name:- VARDAN ENVIRONET Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003 (Haryana).email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. Category / Item no.(in Schedule): B-2
2. Location of Project Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer(Rajasthan)
3. Project Details
M.L. No. /Production capacity “Masonry Stone (Minor Mineral) Mining Project” (Plot No. 83,
Area- 1.00 Ha.) with Production capacity -58000 TPA (ROM) {
Saleable Mineral-52200 TPA & Waste-5800 TPA} Khasra No-
36/1402, at Near village – Kanwlai, Tehsil– Pushkar, District–
Ajmer (Rajasthan) by M/s Pink City Commercial Pvt. Ltd.
4. Project Cost Rs55 Lakhs
5. Water Requirement
& Source
2.5 KLD (Tanker Water Supply from nearby village)
6. Fuel & Energy 180 Litres/day HSD Fuel will be required for mine machineries.
8 Information about Aravalli
Certificate
ME/Aj./Composite/Machi/Aravali/19, dated-22-01-2021
Date of Air/Water/Noise
Monitoring
Environment Monitoring was carried out by NABL approved
laboratory.
9 Information about Topo-sheet map 45 J 10
Environment Sensitivity:
1 Nearest Village Kanwlai (~0.5 km in S direction)
2 Nearest Railway Station Makarwadi Halt Railway station (~7.4 Km, SE direction)
3 Nearest Airport Kishangarh Airport, Ajmer (~23.11 Km, E direction)
4 Nearest National / State
Highway
N.H.89 is ~ 8.9 km ,in SW direction.
N.H.8 is ~ 14.9 km ,in SE direction.
S.H.60 is ~13.1 km ,in W direction. S.H.59 is ~ 14.5 km ,in NW direction.
5 Archaeological Important Place No any Archaeological Important Place found within 15 km
distance from the periphery of lease area.
6 Ecological Sensitive Park,
Wildlife Sanctuary, Reserve etc.
No any Ecological Sensitive Park, Wildlife Sanctuary,
Reserve etc. found within 15 km distance from the periphery
of lease area.
7 Nearest River / water body SaraswatiNadi is ~ 0.6 km, in S direction.
NaharNadi is ~ 6.3 km, in SE direction.
PhulSagar is ~ 10.8 km, in SE direction.
Ana sagar is ~ 13.3 km, in S direction
Pushkar Lake is ~ 12.8 km, in S direction.
KansiyaBala is ~ 4.2 km, in NW direction.
PalriNadi is ~ 14.7 km, in N direction.
8 Reserved/Protected Forests PadampurDungar P.F is ~3.7 km ,in SE direction.
Final minutes of 4.95th meeting held on 27-29 July, 2021
KarelGhati P.F. is ~0.8 km in W direction
MakarwaliHokran R.F is ~6.9 km in SE direction.
DuletGhati R. F. is ~6.5 km ,in SW direction
Mahavir R.F is ~11.6 km ,in SE direction.
Manpur Ki Dhani R.F is ~ 14.5 km ,in E direction. Pilwa R.F. is ~ 10.0 km ,in N direction
Ghinwali P.F is ~ 13.6 km ,in N direction.
10 Environment Management Plan
S.N
o. PARTICULAR
CAPITAL
COST (IN RS.)
RECURRING
COST (IN RS./YEAR)
1 Water sprinkle facility on haul roads to
prevent dust suppression. - 25,000/-
2 Maintenance of approach road - 80,000/-
3 Pollution Monitoring of Ambient Air,
Noise, Water & Soil Quality - 30,000
4 Plantation/Green Belt & maintenance 3,50,000/- 85,000
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 45,000/-
7 Provision of PPES (helmet shoes gloves
goggles etc.) - 15,000/-
9 Emergency rescue fire fightingequipments
and first aid 30,000/- 20,000/-
10
Caution board (will illustrate lease detail
and name of the PHC and contact no. of
doctor)
20,000/- 10,000
11 Solar pole with LED light @ 8000/- Per
Light 50,000/- 5,000/-
TOTAL 5,50,000/- 3,25,000/-
12 Green Belt/ Plantation
Year (Outside the lease area in Khasra No. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer)
(Outside haul roads)
Top Soil Dumps Total
Area (Ha.) No. of Trees
Area (Ha.
No. Of Trees
Area (Ha.)
No. Of Trees
Area (Ha.)
No. Of Trees
Existing - - - - - - 0.11 110 I 0.11 110 - - - - 0.11 110
II 0.11 110 - - - - 0.11 110
III 0.11 110 - - - -
IV Maintenance - - - - Maintenance
V
Total 0.33 330 0.33 330
Annual expenditure: Rs 85,000/- Total 330 saplings will be planted in upcoming 3 years and Area for
plantation is 0.33 Ha will be done outside the lease area in Khasra no. 124/1617, 39 & 99 of village
Kanwlai, Tehsil Pushkar, District-Ajmer
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area
and any other area which may have been disturbed due to their mining activities and restore the land to a
condition which is fit for growth of fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20
13 Budgetary Breakup for Labour
Final minutes of 4.95th meeting held on 27-29 July, 2021
Sr.
No.
Description Capital Cost
(in Rs.) Recurring Cost
(in Rs./Yr.)
1 Rest Shelter 40,000 3,000
2 Drinking water facility 15,000 4,000
3 Toilet Facility (2 units for Male &
Female) 15,000 4,000
4 Fuel for cooking - 4,000
5 Medical facility for labors - 15,000
Total 70,000 30,000
14 Present Status New Mining lease
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
The PP has submitted application for Environmental Clearance for Masonry Stone
(Minor Mineral) Mining Project, Plot No. 83, Area- 1.00 Ha., with Production capacity –
58,000 TPA (ROM) {Saleable Mineral-52,200 TPA & Waste- 5800 TPA}, Khasra No-
36/1402, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer (Rajasthan) (Proposal
No.- 195311). The project is covered under B2 category. The SME, Ajmer vide order dated
18.12.2020 has issued LoI to the PP for mining of Masonry Stone (Cheja Patther). The
mining plan has been approved by the SME, Ajmer vide letter dated 21.01.2021. ME, Ajmer
in his certificate dated 22.01.2021 has stated that the mining lease does not fall in Aravalli
hills.
According to the certificate dated 22.01.2021, issued by ME, Ajmer, there is no
cluster formation in terms of notification dated 15.01.2016 and 01.07.2016 of the MoEF &
CC.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Observations and Resolutions of the Committee:
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated 30.06.2021. The SEAC, in its 4.95th meeting held on 27-29
July, 2021 went through the reply. Incompliance of the query the PP has submitted copy of
certificate dated 27.05.2021 of DCF, Ajmer stating that there is no National Park/ Wildlife
Sanctuary within 10 Km from plot no. 82, 83, 84, 86, 86, 88, 90, 91, 92, 93, 94 (total 11
plots) (LOI).
Keeping in view the information contained in the documents submitted by the PP and
presentation made by him before the SEAC and after detailed deliberations, the members
resolved to recommend to SEIAA for the grant of EC to M/s Pink City Commercial Pvt. Ltd.
Final minutes of 4.95th meeting held on 27-29 July, 2021
for Masonry Stone (Minor Mineral) Mining Project, Plot No. 83, Area- 1.00 Ha., with
Production capacity – 58,000 TPA (ROM) {Saleable Mineral-52,200 TPA & Waste- 5800
TPA}, Khasra No- 36/1402, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer
(Rajasthan) (Proposal No.- 195311), with the stipulation that the PP shall abide by the annual
production scheduled specified in mining plan and that any deviation there in will render the
PP liable for legal action in accordance with Environment and Mining Laws, with the specific
and general conditions annexed at Annexure ‘A’. Project Name:- Environmental Clearance
for Masonry Stone (Minor Mineral) Mining Project, Plot No. 83, Area- 1.00 Ha., with
Production capacity – 58,000 TPA (ROM) {Saleable Mineral-52,200 TPA & Waste- 5800
TPA}, Khasra No- 36/1402, at Near village – Kanwlai, Tehsil– Pushkar, District– Ajmer
(Rajasthan) (Proposal No.- 195311). Project Proponent Name:- M/s Pink City Commercial
Pvt. Ltd. Add.- B-219, B-Scheme, Gopalpura, Bypass, Distt.- Jaipur (Raj.)
[email protected]. Consultant Name:- VARDAN ENVIRONET Add: Plot
No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana).email:-
Additional Agenda no. 06. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.
1(a)B2(19089)/ 2019-20
Project Name:- Environmental Clearance for Masonry Stone (Minor Mineral) Mining
Project, Plot No.- 84, Area- 1.00 Ha, with Production Capacity- 58,000 TPA (ROM)
{Saleable Mineral- 52,200 TPA & Waste- 5800 TPA}, Khasra No- 36/1402, at Near Vill.-
Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.) (Proposal No.- 194897).
Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd. Add.- B-219, B-Scheme,
Gopalpura, Bypass, Distt.- Jaipur (Raj.), [email protected]. Com
Consultant Name:- VARDAN ENVIRONET Add: Plot No.-82-A, Sector- 5, IMT Manesar,
Gurgaon-122003 (Haryana). email:- [email protected].
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1 Category / Item no.(in Schedule):
1(a)B2
2. 2 Location of Project Near village – Kanwlai, Tehsil– Pushkar, District – Ajmer (Rajasthan)
3. 3 Project Details PlotNo./Area/Production capacity/Khasra No.
Plot No.-84
Area – 1.0Ha.
Production capacity -58000 TPA (ROM) {Saleable- 52200 TPA & Waste- 5800 TPA}
Khasra No.-36/1402
4. 4 Project Cost Rs. 60Lakhs
5. 5 Water Requirement & Source
2.5 KLD (Tanker Water Supply from nearby village)
6. 6 Fuel & Energy
150Litres/day HSD Fuel will be required for mine machineries.
7. 7 Application No.& Date & documents submitted
Hard Copy Submitted to SEIAA, Rajasthan SIA/RAJ/MIN/194897/2021on dated 28-01-2021
8. 8 Information about Aravalli Certificate
ME/Aj/Composite/Machi/AravaliPra-/21, dated- 22.01.2021
9. 9 Date of Air/Water/Noise Monitoring
Environment Monitoring was carried out by NABL approved laboratory.
10. Information about Topo-sheet
map
45 J 10
Final minutes of 4.95th meeting held on 27-29 July, 2021
11. Environment Sensitivity
1 Nearest Village Kanwlai (~0.5 km in South direction)
2 Nearest Railway Station Makarwadi Halt Railway station (~7.5 Km, SE direction)
3 Nearest Airport Kishangarh Airport, Ajmer (~22.9 Km, SE direction)
4 Nearest National / State Highway N.H.89 (~8.9 km, SW) S.H.60 (~13.1 km, West) S.H.59 (~14.5km, NW) N.H.8 (~14.9 km, SE)
5 Archaeological Important Place No any Archaeological Important Place found within 15 km distance from the periphery of lease area.
6 Ecological Sensitive Park, Wildlife
Sanctuary, Reserve etc.
No any Ecological Sensitive Park, Wildlife Sanctuary, Reserve etc.
found within 15 km distance from the periphery of lease area.
7 Nearest River / water body SaraswatiNadi (~0.6 Km, South) KansiyaBala (~4.2 km , NW) NaharNadi (~6.3 km ,SE) PhulSagar (~10.8 km, SE) Pushkar Lake (~12.8km ,South) Anasagar (~13.3 km, South) PalriNadi (~14.7 km, North)
8 Reserved/Protected Forests KarelGhati P.F. (~0.8 km , West) PadampurDungar P.F (~3.7 km ,SE) DuletGhati R. F. (~6.5 km , SW) MakarwaliHokran R.F (~6.9 km ,SE) Pilwa R.F. (~10.0 km ,North) Mahavir R.F (~11.6 km ,SE) Manpur Ki Dhani R.F (~14.5 km ,East) Ghinwali P.F (~13.6 km ,North)
12. 1 Environment Management Plan
S.No. PARTICULAR CAPITAL
COST (IN RS.)
RECURRING
COST (IN RS./YEAR)
1 Water sprinkle facility on haul roads to prevent dust suppression. - 25,000/-
2 Maintenance of approach road - 80,000/-
3 Pollution Monitoring of Ambient Air, Noise, Water & Soil Quality
- 30,000
4 Plantation/Green Belt & maintenance 3,50,000/- 90,000
5 Wire fence around mining pits 1,00,000/- 10,000/-
6 Occupational health check-up in a year - 45,000/-
7 Provision of PPES (helmet shoes gloves goggles etc.) - 15,000/-
9 Emergency rescue fire fighting equipments and first aid 30,000/- 30,000/-
10 Caution board (will illustrate lease detail and name of the PHC and contact no. of doctor)
20,000/- 15,000
11 Solar pole with LED light @ 8000/- Per Light 50,000/- 10,000/-
TOTAL 5,50,000/- 3,50,000/-
13. 1 Green Belt/ Plantation
Year (Outside the lease area in Khasra No. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-
Ajmer)
(Outside haul roads)
Top Soil Dumps Total
Area (Ha.) No. of Trees
Area (Ha.
No. Of Trees
Area (Ha.)
No. Of Trees
Area (Ha.) No. Of Trees
Existing - - - - - - 0.11 110
I 0.11 110 - - - - 0.11 110
II 0.11 110 - - - - 0.11 110
III 0.11 110 - - - -
IV Maintenance - - - - Maintenance
V
Total 0.33 330 0.33 330
Annual expenditure: Rs 90,000/- Total 330 saplings will be planted in upcoming 3 years and Area for plantation is 0.33 Ha
will be done outside the lease area in Khasra no. 124/1617, 39 & 99 of village Kanwlai, Tehsil Pushkar, District-Ajmer
Final minutes of 4.95th meeting held on 27-29 July, 2021
The mining lease holders shall, after ceasing mining operations, undertake re-grassing the mining area and any other area
which may have been disturbed due to their mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc. as per MoEF& CC O.M. dated 16.01.20 14. 1 Budgetary Breakup for Labour
Sr. No.
Description Capital Cost (in Rs.)
Recurring Cost (in Rs./Yr.)
1 Rest Shelter 45,000 3,000
2 Drinking water facility 20,000 2,000
3 Toilet Facility (2 units for Male & Female)
10,000 3,000
4 Fuel for cooking - 12,000
5 Medical facility for labors
- 15,000
Total 75,000 35,000
15. 1 Present Status
New Mining Project
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
The PP has submitted application for Masonry Stone (Minor Mineral) Mining Project,
Plot No.- 84, Area- 1.00 Ha, with Production Capacity- 58,000 TPA (ROM) {Saleable
Mineral- 52,200 TPA & Waste- 5800 TPA}, Khasra No- 36/1402, at Near Vill.- Kanwlai,
Tehsil- Pushkar, Distt.- Ajmer (Raj.) (Proposal No.- 194897). The project is covered under
B2 category. The SME, Ajmer vide order dated 18.12.2020 has issued LoI to the PP for
mining of Masonry Stone (Cheja Patther). The mining plan has been approved by the SME,
Ajmer vide letter dated 21.01.2021. ME, Ajmer in his certificate dated 22.01.2021 has stated
that the mining lease does not fall in Aravalli hills.
According to the certificate dated 22.01.2021, issued by ME, Ajmer, there is no
cluster formation in terms of notification dated 15.01.2016 and 01.07.2016 of the MoEF &
CC.
The PP has not submitted certificate from the concerned DCF regarding existence or
otherwise of National Park or Wildlife Sanctuary from the applied lease area. The SEAC,
therefore, decided to ask the PP to submit the same within a period of 45 days failing which
the project shall be recommended to SEIAA for closure and delistment.
Observations and Resolutions of the Committee:
The PP, in response to the query made by SEAC vide letter dated 30.06.2021, has
submitted reply vide letter dated 30.06.2021. The SEAC, in its 4.95th meeting held on 27-29
July, 2021 went through the reply. Incompliance of the query the PP has submitted copy of
certificate dated 27.05.2021 of DCF, Ajmer stating that there is no National Park/ Wildlife
Sanctuary within 10 Km from plot no. 82, 83, 84, 86, 86, 88, 90, 91, 92, 93, 94 (total 11
plots) (LOI).
Keeping in view the information contained in the documents submitted by the PP and
presentation made by him before the SEAC and after detailed deliberations, the members
resolved to recommend to SEIAA for the grant of EC to M/s Pink City Commercial Pvt. Ltd.
Final minutes of 4.95th meeting held on 27-29 July, 2021
for Masonry Stone (Minor Mineral) Mining Project, Plot No.- 84, Area- 1.00 Ha, with
Production Capacity- 58,000 TPA (ROM) {Saleable Mineral- 52,200 TPA & Waste- 5800
TPA}, Khasra No- 36/1402, at Near Vill.- Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 194897), with the stipulation that the PP shall abide by the annual production
scheduled specified in mining plan and that any deviation there in will render the PP liable
for legal action in accordance with Environment and Mining Laws, with the specific and
general conditions annexed at Annexure ‘A’. Project Name:- Environmental Clearance for
Masonry Stone (Minor Mineral) Mining Project, Plot No.- 84, Area- 1.00 Ha, with
Production Capacity- 58,000 TPA (ROM) {Saleable Mineral- 52,200 TPA & Waste- 5800
TPA}, Khasra No- 36/1402, at Near Vill.- Kanwlai, Tehsil- Pushkar, Distt.- Ajmer (Raj.)
(Proposal No.- 194897). Project Proponent Name:- M/s Pink City Commercial Pvt. Ltd.
Add.- B-219, B-Scheme, Gopalpura, Bypass, Distt.- Jaipur (Raj.), Email-
[email protected]. Com, Consultant Name:- VARDAN ENVIRONET Add: Plot
No.-82-A, Sector- 5, IMT Manesar, Gurgaon-122003 (Haryana). email:-
Additional Agenda no. 07. File no. F1 (4)/SEIAA/SEAC-Raj/Sectt/Project / Cat.
1(a)B2(15602)/ 2019-20
Project Name:- Application for expansion in production capacity from 50,000 TPA -
12,61,730 MTPA of Quartz, Feldspar, Calcite and inclusion of Masonry Stone mining project
along with Mineral Grinding Unit/Crusher at mine lease of 12,61,730 TPA capacity in total,
M.L.- 34/04, Area- 20.0 ha., Khasra no. 1, 3, 47, 49, 56, 34 to 39, 50 to 52 of Village
Atbhigha; Khasra no. 96, 97, 93, 94 of village Chak basdi; Khasra no. 60, 69, 71, 70, 70/471,
67, 68, 66 and 70 of village Chak Khandela; Khasra no. 65/1, 65/2, 66, 66/170 of village
Khandela basdi and Khasra no. 2, 11/305 of village Charanwas at near Village- Atbhigha,
Tehsil- Khandela, District- Sikar, State- Rajasthan (Proposal no - 48618).
Project Proponent Name:- M/s Reverence Mines & Minerals Pvt. Ltd., Sh. Anil Gupta,
Director and Authorized Signatory Sh. Inder Kumar, Add-A-28, Anita Colony, Bajaj Nagar,
Jaipur, [email protected].
Consultant Name:- TEAM Institute of Science & Technology Pvt. Ltd.,E-65,Chitranjan
marg, C-Scheme, Jaipur.
The particulars of the project, in brief, as submitted by the PP are as follows:
1. 1 Category / Item No.
(in Schedule)
Item No.- 1(a)
Category- B-1
2. 2 Location of Project Quartz, Feldspar, Calcite and Masonry Stone Mine Mine (ML No.- 34/04) Near Village-
Athbigha, Tehsil- Khandela, District-Bhilwara, Rajasthan
3. 3 Project Details
M.L. No. /Production
capacity
M. L. No.- 34/04
Area- 20.0 ha
Production of Quartz, Feldspar, Calcite and Masonry Stone - 1261730 TPA
Final minutes of 4.95th meeting held on 27-29 July, 2021
Along with Mineral Grinding Unit/Crusher at mine lease of 1261730 TPA capacity in total
4. Life of Mine Co-terminus with the lease period.
As per approved mining plan LOM is 8 years, but as the reserves will increase, the life of
mine will also increase.
5. 4 Project Cost Rs. 2.0 Crore
6. 5 Water Requirement
& Source
Water Requirement- 8.0 KLD
Source- Water will be sourced from nearby village from the lease area.
Details are available in the submitted report.
7. 6 Fuel & Energy
Electric power will be fulfilled by RSEB.
Fuel is required for the operation of machines mounted compressor, truck/ tipper; this will
be taken care by the contractor.
8. 7 Application No. &
Date & documents
submitted
Application No.- 15602
Final EIA Report Submission Date- 08.01.2020
Documents Submitted- Form-1, EIA/EMP report, Annexures.
9. 8 Information about
Aravalli Certificate.
Date and dispatch No. of Aravalli certificate- ME/Sikar/M.L.20198/33 Dated 31.05.2019.
Details are available in report as Annexure-V
10. Date of
Air/Water/Noise
Monitoring
Study was carried out for three month from March 2019 to may 2019
Report is enclosed in report as Annexure VI
11. 9 Information about 500
mts composite map
As it is “Category B1” project.
12. 1 Environment
Management Plan
Capital Cost- Rs. 11,84,000/-
Recurring Cost-Rs. 4,67,400/-
Details are available of the submitted report.
Budgetary Allowance for Environmental Management
S.
No.
Description Capital
Cost (Rs.)
Recurring
Cost/Year
(Rs.)
1 Septic Tank followed by soak pit 20,000 500
2 Green Belt Development (including maintenance) 1,64,000 4,10,000
3 Wire fencing at plantation site 65,000 5,000
4 Water Sprinkling 5,000 10,000
Final minutes of 4.95th meeting held on 27-29 July, 2021
5 Waste Dump Management 20,000 5,000
6 Haul road and other roads repair and maintenance - 10,000
7 Monitoring of Air, Water, Noise & Soil - 26,900
Total Rs.
2,74,000/-
Rs.
4,67,400/-
Infrastructural support to Rajkiya Ucchay Prathmik Vidhylaya Piploda ka Bas, Village-
Atbhigha, Tehsil-Khandela, Sikar (Total Students-50, Boys-20;Girls-30;Staff-4.)
8 Construction of
kitchen in school.
One kitchen Rs.50,000/- 50,000/- -
9 One unit RO with
water cooler.
Rs.50,000/- per unit. 50,000/- -
10 Furniture for students
and staff.
Rs.50,000/-(50 benches+
[email protected]/unit, & one
table +four chairs for staff.
60,000/- -
11 Repairing of ceiling
in class rooms.
Rs.1,50,000/- (Four class
rooms)
1,50,000/- -
12 Repairing of the
school boundary wall.
Rs. 40,000/- 40,000/- -
13 Fans and bulbs along
with fitting.
Rs. 50,000/- 50,000/- -
Total Rs.
4,00,000/-
Public Hearing points
14 Solar light on both
side of road
Rs.20,000/- per unit. 4,00,000/-
15 Water tank along
with one unit RO
with water cooler in
village Atbhigha near
bus stand
Rs.60,000/- per unit. 60,000/-
16 Plantation of on
both side of road
Rs. 500/- per tree with tree
guard
50,000/-
Total Rs.
5,10,000/-
-
Grand total Rs.
11,84,000/-
Rs.
4,67,400/-
13. Public hearing Points S.No Major issues raised in Public Hearing
Action taken by PP Budget allotted and time period
1. Shri Mahesh Kr PP replied that plantation Rs. In monsoon
Final minutes of 4.95th meeting held on 27-29 July, 2021
Bajiya raised issue
of Air Pollution and
Job opportunities for
local people
at mine site, along with
boundary and both side of
road will be done to protect
the air pollution.
Mine will provide 135 jobs
to local people directly and more than 100 will be
associated through
indirectly.
50,000/-
for
plantation
on both
side of
road to control
air
pollution
season,
plantation
drive will be
arranged and
more than 100
plants will be planted
alongside the
road.
2. Shri Aminchnad and
Sarli Hakim said
drinking water
facility should be
arranged for
villagers at village.
PP assured that one water
tank with RO unit and
cooler will be set up at
near bus stand in village
atbhigha for safe and clean
water.
Rs.
60,000/-
for the
safe
drinking
water
facility
This activity
will be done at
the time of the
inauguration
of mine
activity.
3. Shri Bhawani Singh
raised that proper
lighting arrangement should be made for
safe movement of
road.
PP in reply assure that
solar lights will be
provided on road side for better visibility at night.
Rs.
4,00,000/
- will be spent on
solar
lights on
the road
sides.
In first year 10
solar lights
and next year 10 lights will
be installed.
14. 1 Green Belt/ Plantation
Proposed Plantation will be 2650 Plants, which will cover 6.60 Ha. Of the total land.
Year Un-worked
Area
Waste Dump
(Outside)
Inside Dump
(Reclaimed
Area)
Top Soil
Dumps
Total
Area
(Ha.)
No.
of
Tree
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
Area
(Ha.)
No.
of
Trees
Existing 0.20 50 - - - - - - 0.20 50
I 1.28 520 - - - - - - 1.28 520
II 1.28 520 - - - - - - 1.28 520
III 1.28 520 - - - - - - 1.28 520
IV 1.28 520 - - - - - - 1.28 520
V 1.28 520 - - - - - - 1.28 520
VIth
Year
Onwards
- - - - - - - - - -
Total 6.60 2650 - - - - - - 6.60 2650
15. 1 Budgetary Breakup Fixed Explicit Investment- Rs. 50,000/-
Final minutes of 4.95th meeting held on 27-29 July, 2021
for Labour Running Expenses Per Year- Rs. 50,000/-
Details are available in the submitted report.
16. Present Status The mine is closed (since 1.04.2013 to till date).
Brief details of the project:-
The SEAC considered/examined the project proposal submitted by the PP and also the
presentation made by him through VC/Electronic media in accordance with letter dated
27.05.2020 of SEIAA, Rajasthan.
BACK Ground Note : Proceeding of the 4.13th meeting of SEAC held on 27th
, 28th
, 29th
and 30th
May, 2019 at Agenda no. 16.
The PP had obtained EC from the MoEF & CC vide letter dated 15.05.2006 for
mining of 5000 TPA of Quartz Feldspar, Calcite and Masonry Stone at mining lease No.
34/04 comprising 20.0 hectare located at Village - Athbigha, Tehsil-Khandela, District-Sikar,
State- Rajasthan under the EIA notification dated 27.01.1994. As per approved mining plan
the lease area comprises Khasra no. 1, 3, 47, 49, 56, 34 to 39, 50 to 52 of Village Athbigha;
Khasra no. 96, 97, 93, 94 of village Chak basdi; Khasra no. 60, 69, 71, 70, 70/471, 67, 68, 66
and 70 of village Chak Khandela; Khasra no. 65/1, 65/2, 66, 66/170 of village Khandela
basdi and Khasra no. 2, 11/305 of village Charanwas. The PP has sought ToR for increasing
production of the aforesaid minerals from 5,000 TPA to 12,61,730 TPA. The modified
mining plan has been approved by SME, Jaipur on 19.04.2018. The project cost is 2.00
Crore. The mining lease is a part of cluster as per cluster map prepared by the Mining
Engineer and being so the project requires preparation of cluster EIA and EMP and holding
of common public hearing.
The SEAC in pursuance to the decision taken on 28th May, 2019, inter alia, prescribed
the ToR vide letter dated 19.06.2019. The PP has collected base line data from March, 2019-
May, 2019. In compliance of ToR, PP has conducted Public hearing on 21.11.2019 at
Karyalay Panchayat Samiti Khandela, Sikar, under the Chairmanship of DIG, Stamp Cum
Secretary, UIT and RO, RSPCB, Sikar.
The PP has submitted application for expansion in production capacity from 50,000
TPA - 12,61,730 MTPA of Quartz, Feldspar, Calcite and inclusion of Masonry Stone mining
project, along with Mineral Grinding Unit/Crusher at mine lease of 12,61,730 TPA capacity
in total, M.L.- 34/04, Area- 20.0 ha., at near Village- Atbhigha, Tehsil- Khandela, District-
Sikar, State- Rajasthan. The SME, Udaipur has granted LOI for inclusion of mineral Masonry
Stone on 09.01.2018. SME, Udaipur vide letter dated 12.11.2020 has extended validity of
LOI for 06 months from date of issue of letter. The mining plan has been approved by the
SME, Jaipur vide letter dated 26.05.2020. ME, Ajmer in his certificate dated 31.05.2019 has
stated that the mining lease does not fall in Aravalli hills. DCF, Sikar in his certificated dated
03.01.2020 stated that there is no Wildlife Sanctuary/National Park/ Conservation Reserve
within 10 km periphery of the mine. The project does not involve approval/ clearance under
the Forest (Conservation) Act, 1980 and Wild Life Protection Act, 1972 as no forest land is
involved and neither there is any Wild Life Sanctuary/ National Park within 10 Km from the
Final minutes of 4.95th meeting held on 27-29 July, 2021
project site. As per cluster certificate issued by ME, Sikar on 19.12.2019, the total area of all
the mining leases in the cluster having area of 20.0 ha.
The PP has submitted affidavit of transferor stating that he has no objection to transfer
of EC from Sh. Parakram Singh to M/s Reverence Mines & Minerals Pvt. Ltd. Undertaking
has also been given by the transferee, M/s Reverence Mines & Minerals Pvt. Ltd (Sh. Inder
Kumar, Director) that he will comply with all the conditions (specific and general) laid down
in the EC issued by MoEF & CC vide order dated 15.05.2006.
The SEAC, while considering the proposal for transfer of EC and enhancement of
production capacity, as mentioned above, was of the view that the recommendation for
enhancement of production can only be made after SEIAA has sanctioned proposal for
transfer of EC. The SEAC, therefore, decided in the first instance to make recommendation
only with respect to the proposal for transfer of EC. The SEAC accordingly also decided that
it will be take up the matter of enhancement of production only after SEIAA has sanctioned
transfer of EC.
Observations and Resolution of the Committee:
The SEAC took up the matter and considered/examined the project proposal in its
4.95th meeting held on 27-29 July, 2021 in the light of the order dated 16.04.2021 of SEIAA
transfer in EC from Sh. Parakram Singh to M/s Reverence Mines & Minerals Pvt. Ltd.
The SEAC, in its 4.65th meeting held on 28-29 Dec, 2020, had recommended to
SEIAA for transferring of EC dated 15.05.2006.
The SEIAA in its order dated 16.04.2021 has mentioned that the authority has
accepted the recommendation of SEAC as per provisions of Para 11 of EIA Notification
2006. The para 11 of EIA notification 2006 relates with transfer of EC.
The SME, Udaipur has granted LOI for inclusion of mineral Masonry Stone on
09.01.2018. SME, Udaipur vide letter dated 12.11.2020 has extended validity of LOI for 06
months from date of issue of letter. SME, Udaipur vide letter dated 20.07.2021 has further
extended validity of LOI for 06 months from date of issue of letter.
The SEAC in pursuance to the decision taken on 28th May, 2019, inter alia, prescribed
the ToR vide letter dated 19.06.2019. The PP has collected base line data from March, 2019-
May, 2019. In compliance of ToR, PP has conducted Public hearing on 21.11.2019 at
Karyalay Panchayat Samiti Khandela, Sikar, under the Chairmanship of DIG, Stamp Cum
Secretary, UIT and RO, RSPCB, Sikar.
The PP has submitted compliance report, vide letter dated 06.01.2019 of the RO,
RSPCB, Sikar certifying compliance of conditions of the earlier EC issued vide letter dated
15.05.2006.
The SEAC considered the order dated 16.04.2021 of the SEIAA, Form-1, Form-2,
Pre-feasibility report, other documents submitted by the PP/Consultant and background as
stated above and therefore, resolved to recommend to SEIAA for grant of EC to M/s
Reverence Mines & Minerals Pvt. Ltd., Sh. Anil Gupta, Director and Authorized Signatory
Sh. Inder Kumar for expansion in production capacity from 50,000 TPA - 12,61,730 MTPA
of Quartz, Feldspar, Calcite and inclusion of Masonry Stone mining project, along with
Final minutes of 4.95th meeting held on 27-29 July, 2021
Mineral Grinding Unit/Crusher at mine lease of 12,61,730 TPA capacity in total, M.L.-
34/04, Area- 20.0 ha., Khasra no. 1, 3, 47, 49, 56, 34 to 39, 50 to 52 of Village Athbigha;
Khasra no. 96, 97, 93, 94 of village Chak basdi; Khasra no. 60, 69, 71, 70, 70/471, 67, 68, 66
and 70 of village Chak Khandela; Khasra no. 65/1, 65/2, 66, 66/170 of village Khandela
basdi and Khasra no. 2, 11/305 of village Charanwas at near Village- Athbigha, Tehsil-
Khandela, District- Sikar, State- Rajasthan (Proposal no- 48618), with the stipulation that the
PP shall abide by the annual production scheduled specified in mining plan and that any
deviation there in will render the PP liable for legal action in accordance with Environment
and Mining Laws, with the specific and general conditions annexed at Annexure ‘A’. Project
Name:- Application for expansion in production capacity from 50,000 TPA - 12,61,730
MTPA of Quartz, Feldspar, Calcite and inclusion of Masonry Stone mining project, M.L.-
34/04, Area- 20.0 ha., Khasra no. 1, 3, 47, 49, 56, 34 to 39, 50 to 52 of Village Athbigha;
Khasra no. 96, 97, 93, 94 of village Chak basdi; Khasra no. 60, 69, 71, 70, 70/471, 67, 68, 66
and 70 of village Chak Khandela; Khasra no. 65/1, 65/2, 66, 66/170 of village Khandela
basdi and Khasra no. 2, 11/305 of village Charanwas at near Village- Athbigha, Tehsil-
Khandela, District- Sikar, State- Rajasthan (Proposal no- 48618). Project Proponent
Name:- M/s Reverence Mines & Minerals Pvt. Ltd., Sh. Anil Gupta, Director and Authorized
Signatory Sh. Inder Kumar, Add-A-28, Anita Colony, Bajaj Nagar, Jaipur, E-Mail-
Final minutes of 4.95th meeting held on 27-29 July, 2021
AANNNNEEXXUURREE--““AA””
1. Statutory compliance:
i. This Environmental Clearance (EC) is subject to orders/ directions of Hon’ble
Supreme Court of India, Hon’ble High Court, Hon’b1e NGT and any other Court
of Law, as is applicable.
ii. The Project proponent complies with all the statutory requirements and judgments
of Hon’b1e Supreme Court dated 2nd August, 2017 in Writ Petition (Civil) No.
114 of 2014 in matter of Common Cause versus Union of India & Ors before
commencing the mining operations.
iii. The Department of Mines & Geology, Government of Rajasthan (DMG, GoR)
shall ensure that mining operation shall not be commenced till the entire
compensation levied, if any, for illegal mining paid by the Project Proponent
through Department of Mining & Geology in strict compliance of Judgment of
Hon’ble Supreme Court dated 2nd August, 2017 in Writ Petition (Civil) No. 114 of
2014 in matter of Common Cause versus Union of India & Ors.
iv. In case the project falls within a distance of 10 Km from the boundary of a
National Park/ Wildlife Sanctuary, wherein final ESZ Notification has not
been issued so far, the EC shall come into effect only after the PP obtains
clearance from the Standing Committee of National Board for Wildlife
(SCNBWL) as per OM dated 08.08.2019 of MoEF & CC.
v. This Environmental Clearance shall become operational only after receiving
formal SCNBWL Clearance from Ministry of Environment, Forest & Climate
Change, (MoEF & CC), Government of India (GoI) subsequent to the
recommendations of the Standing Committee of National Board for Wildlife, if
applicable to the Project.
vi. This Environmental Clearance shall become operational only after receiving
Forest Clearance (FC) under the provision of Forest Conservation Act, 1980, if
applicable to the Project.
vii. Project Proponent (PP) shall obtain Consent to Operate after grant of EC and
effectively implement all the conditions stipulated therein. The mining activity
shall not commence prior to obtaining Consent to Establish/ Consent to Operate
from the State Pollution Control Board.
viii. The PP shall adhere to the provision of the Mines Act, 1952, Mines and Mineral
(Development & Regulation), Act, 2015 and rules & regulations made there under.
PP shall adhere to various circulars issued by Directorate General Mines Safety
(DGMS) and Indian Bureau of Mines (IBM) from time to time.
ix. The Project Proponent shall obtain consents from all the concerned land owners,
Final minutes of 4.95th meeting held on 27-29 July, 2021
before start of mining operations, as per the provisions of MMDR Act, 1957 and
rules made thereunder in respect of lands which are not owned by it.
x. The Project Proponent shall follow the mitigation measures provided in MoEF
CC’s Office Memorandum No. Z-11013/57/2014-IA.II (M), dated 29th October,
2014, titled “Impact of mining activities on Habitations-Issues related to the
mining Projects wherein Habitations and villages are the part of mine lease areas
or Habitations and villages are surrounded by the mine lease area”.
xi. The Project Proponent shall obtain necessary prior permission of the competent
authorities for drawl of requisite quantity of surface water and from CGWA for
withdrawal of ground water for the project.
xii. A copy of EC letter will be marked to concerned Panchayat/ local NGO etc. if
any, from whom suggestion/ representation has been received while processing
the proposal.
xiii. State Pollution Control Board shall be responsible for display of this EC letter at
its Regional office, District Industries Centre and Collector’s office/ Tehsildar’s
Office for 30 days.
xiv. The Project Authorities should widely advertise about the grant of this EC letter by
printing the same in at least two local newspapers, one of which shall be in
vernacular language of the concerned area. The advertisement shall be done
within 7 days of the issue of the clearance letter mentioning that the instant project
has been accorded EC and copy of the EC letter is available with the State
Pollution Control Board and website of the Department of Environment, Govt. of
Rajasthan, RSPCB for compliance and record.
xv. The Project Proponent shall inform the MoEF & CC/ SEIAA for any change in
ownership of the mining lease. In case there is any change in ownership or mining
lease is transferred then mining operation shall only be carried out after transfer of
EC as per provisions of the para 11 of EIA Notification, 2006 as amended from
time to time.
xvi. The Mining Department will ensure that while executing the mining lease, if the
mining lease forms a cluster of total area of more than 5.0 ha, in accordance with
EIA notification dated 15.01.2016 and 01.07.2016, then such mining lease will be
executed/ registered only after public hearing has taken place for the entire cluster
and there has been EIA/EMP study of the entire cluster. The Mining Department
will further ensure that revised EC is also obtained by such mining lease holder (s)
in the cluster.
xvii. The Mining lease holder shall, after ceasing mining operations, undertake re-
grassing the mining area and any other area which may have been disturbed due to
the mining activities and restore the land to a condition which is fit for growth of
fodder, flora, fauna etc.
Final minutes of 4.95th meeting held on 27-29 July, 2021
xviii. That the grant of this E.C. is issued from the environmental angle only, and does
not absolve the project proponent from the other statutory obligations prescribed
under any other law or any other instrument in force. The sole and complete
responsibility, to comply with the conditions laid down in all other laws for the
time-being in force, rests with the project proponent.
xix. No further expansion or modifications in the project shall be carried out without
prior approval of the SEIAA/MoEF & CC as the case may be. In case of
deviations or alterations in the project proposal from those submitted to this
Authority for clearance, a fresh reference shall be made to the Authority to assess
the adequacy of conditions imposed and to include additional environmental
protection measures required, if any.
xx. The EC is liable to be rejected/ revoked, in case it is found that the PP has
deliberately concealed and/or furnished false and misleading information or data
which is material to screening or scoping or appraisal or decision on the
application for EC.
xxi. Officials from the Department of Environment, Government of Rajasthan, Jaipur/
Regional Office of MoEF & CC, Lucknow, RSPCB who would be monitoring the
implementation of Environmental safeguards should be extended full cooperation,
facilities and documents/data by the project proponents during their inspection. A
complete set of all the documents submitted to SEIAA should be forwarded to the
CCF, Regional Office of MoEF, Lucknow, Department of Environment,
Government of Rajasthan, Jaipur / RSPCB.
xxii. The Authority reserves the right to add additional safeguard measures
subsequently, if found necessary, and to take action including revoking of the
environment clearance under the provision of the Environment (Protection) Act,
1986, to ensure effective implementation of the suggested safeguard measures in a
time bound and satisfactory manner.
xxiii. The above condition shall be enforced among others under the provisions of
Water (Prevention and Control of Pollution) Act, 1974, the Air (Prevention and
Control of Pollution) Act, 1981, the Environment (Protection) Act, 1986, the
Public Liability (Insurance) Act, 1991 and EIA Notification, 2006, along with
their amendments and rules.
xxiv. The PP shall obtain prior clearance from forestry and wildlife aspects including
clearance from Standing Committee of National Board of Wild Life (if
applicable). It is further categorically stated that grant of EC does not necessary
imply that Forestry and Wildlife clearance shall be granted to the project by the
concerned authorities. Proposals for forestry and wildlife clearance will be
considered by the concerned authorities on its merits and decision taken
accordingly. The investment made in the project, if any based on EC so granted,
in anticipation of clearance from Forestry and Wildlife aspects shall be entirely at
the cost and risk of the PP and MOEF & CC/SEIAA/ SEAC/ DOE shall not be
responsible in this regard in any manner.
xxv. The SEIAA, Rajasthan may revoke or suspend the Environmental Clearance, if
implementation of any of the above conditions is not satisfactory.
Final minutes of 4.95th meeting held on 27-29 July, 2021
xxvi. The PP shall submit an environmental statement for the financial year ending 31st
March in Form-V as prescribed under the environment (Protection) Rules, 1986,
as amended subsequently on or before the 30th day of September every year, to the
Rajasthan State Pollution Control Board/SEIAA and shall also be put on the
website of the company/ unit/ industry along with the status of compliance of
environmental clearance conditions and shall also be sent to the Lucknow
Regional offices of MoEF/SEIAA/ RSPCB by e-mail as well as hard copy duly
signed by competent person of company.
xxvii. This EC is granted for mining of the mineral with production mentioned in the
above table subject to the stipulation that the PP shall abide by the annual/
permitted production schedule specified in the mining plan and that any deviation
therein will render the PP liable for legal action in accordance with Environment
and Mining Laws.
xxviii. The PP shall spend the various amounts in the respective heads as mentioned in
Annexure G.
xxix. Drills shall either be operated with dust extractors or equipped with water
injections system.
xxx. Data on ambient air quality and stack emissions should be submitted to Rajasthan
State Pollution Control Board once in six months. The monitoring/ sampling and
analysis are to be carried out by MOEF/ NABL/ CPCB/ RSPCB/ Government
approved lab.
xxxi. Blasting operations, if permitted, should be carried out only during the daytime
with safe blasting parameters.
xxxii. The PP shall carry out mining activities with open cast method. The PP to
undertake underground mining only if permitted specifically.
xxxiii. In the project related to Bajri mining the PP shall follow the ‘Sustainable Sand
Mining Guidelines 2016’ and ‘Enforcement and Monitoring Guidelines for Sand
Mining, 2020’ laid down by the MoEF & CC, GOI. The Bajri sand mining
activity is restricted to three meters from ground level or water level whichever is
less and the PP shall carry out river sand (Bajri) mining activity only manually or
semi mechanized method as provided under the ‘Sustainable Sand Mining
Management Guidelines, 2016’ and ‘Enforcement and Monitoring Guidelines for
Sand Mining, 2020’.
xxxiv. Any appeal against this environmental clearance shall lie with the National Green
Tribunal, if preferred, within a period of 30 days as prescribed under section 16 of
the National Green Tribunal Act, 2010.
2. Air quality monitoring and preservation:
i. The Project Proponent shall install a minimum of 3 (three) online Ambient Air
Quality Monitoring Stations with 1 (one) in upwind and 2 (two) in downwind
direction based on long term climatological data about wind direction such that an
angle of 120° is made between the monitoring locations to monitor critical
Final minutes of 4.95th meeting held on 27-29 July, 2021
parameters, relevant for mining operations, of air pollution viz. PMI 0, PM2.5,
NO2; CO and SO2 etc. as per the methodology mentioned in NAAQS
Notification No. B-29016/20/90/PCI/I. dated l 8.11.2009 covering the aspects of
transportation and use of heavy machinery in the impact zone. The ambient air
quality shall also be monitored at prominent places like office building, canteen
etc. as per the site condition to ascertain the exposure characteristics at specific
places. The above data shall be digitally displayed within 03 months in front of the
main Gate of the mine site.
ii. Effective safeguard measures for prevention of dust generation and subsequent
suppression (like regular water sprinkling, metalled road construction etc.) shall
be carried out in areas prone to air pollution wherein high levels of PM10 and
PM2.5 are evident such as haul road, loading and unloading point and transfer
points. The fugitive dust emissions from all sources shall be regularly controlled by
installation of required equipments/ machineries and preventive maintenance. Use
of suitable water-soluble chemical dust suppressing agents may be explored for
better effectiveness of dust control system. It shall be ensured that air pollution
level conform to the standards prescribed by the MoEF & CC/ Central Pollution
Control Board.
3. Water quality monitoring and preservation:
i. In case, immediate mining scheme envisages intersection of ground water table, then
Environmental Clearance shall become operational only after receiving formal
clearance from CGWA. In case, mining operation involves intersection of ground
water table at a later stage, then PP shall ensure that prior approval from CGWA and
MoEF & CC is in place before such mining operations. The permission for
intersection of ground water table shall essentially be based on detailed hydro-
geological study of the area.
ii. Regular monitoring of the flow rate of the springs and perennial nallahs flowing in
and around the mine lease shall be carried out and records maintain. The natural water
bodies and or streams which are flowing in an around the village, should not be
disturbed. The Water Table should be nurtured so as not to go down below the pre-
mining period. In case of any water scarcity in the area, the Project Proponent has to
provide water to the villagers for their use. A provision for regular monitoring of
water table in open dug well located in village should be incorporated to ascertain the
impact of mining over ground water table. The Report on changes in Ground water
level and quality shall be submitted on six-monthly basis to the Regional Office of the
Ministry, CGWA and State Groundwater Department / State Pollution Control Board.
iii. Project Proponent shall regularly monitor and maintain records w.r.t. ground water
level and quality in and around the mine lease by establishing a network of existing
wells as well as new piezo-meter installations during the mining operation in
consultation with Central Ground Water Authority/ State Ground Water Department.
The Report on changes in Ground water level and quality shall be submitted on six-
monthly basis to the Regional Office of the Ministry, CGWA and State Groundwater
Final minutes of 4.95th meeting held on 27-29 July, 2021
Department / State Pollution Control Board.
iv. The Project Proponent shall undertake regular monitoring of natural water course/
water resources/ springs and perennial nallahs existing/ flowing in and around the
mine lease and maintain its records. The project proponent shall undertake regular
monitoring of water quality upstream and downstream of water bodies passing within
and nearby/ adjacent to the mine lease and maintain its records. Sufficient number of
gullies shall be provided at appropriate places within the lease for management of
water. PP shall carryout regular monitoring w.r.t. pH and included the same in
monitoring plan. The parameters to be monitored shall include their water quality vis-
a-vis suitability for usage as per CPCB criteria and flow rate. It shall be ensured that
no obstruction and/ or alteration be made to water bodies during mining operations
without justification and prior approval of MoEF & CC. The monitoring of water
courses/ bodies existing in lease area shall be carried out four times in a year viz. pre-
monsoon (April-May), monsoon (August), post-monsoon (November) and winter
(January) and the record of monitored data may be sent regularly to Ministry of
Environment, Forest and Climate Change and its Regional Office, Central Ground
Water Authority and Regional Director, Central Ground Water Board, State Pollution
Control Board and Central Pollution Control Board. Clearly showing the trend
analysis on six –monthly basis.
v. Quality of polluted water generated from mining operations which include Chemical
Oxygen Demand (COD) in mines run-off; acid mine drainage and metal
contamination in runoff shall be monitored along with Total Dissolved Solids (TDS),
Dissolved Oxygen (DO), pH and Total Suspended Solids (TSS). The monitored data
shall be uploaded on the website of the company as well as displayed at the project
site in public domain, on a display board, at a suitable location near the main gate of
the Company. The circular No.I-20012/1/2006-IA.II (M) dated 27.05.2009 issued by
Ministry of Environment, Forest and Climate Change may also be referred in this
regard.
vi. Project Proponent shall plan, develop and implement rainwater harvesting measures
on long term basis to augment ground water resources in the area in consultation with
Central Ground Water Board/ State Groundwater Department. A report on amount of
water recharged needs to be submitted to Regional Office MoEF & CC annually.
vii. Industrial waste water (workshop and waste water from the mine) should be properly
collected and treated so as to conform to the notified standards prescribed from time
to time. The standards shall be prescribed through Consent to Operate (CTO) issued
by concerned State Pollution Control Board (SPCB). The workshop effluent shall be
treated after its initial passage through Oil and grease trap.
viii. The water balance/water auditing shall be carried out and measure for reducing the
consumption of water shall be taken up and reported to the Regional Office of the
MoEF & CC and State Pollution Control Board.
Final minutes of 4.95th meeting held on 27-29 July, 2021
4. Noise and vibration monitoring and prevention:
i. The peak particle velocity at 500m distance or within the nearest habitation,
whichever is closer shall be monitored periodically as per applicable DGMS
guidelines.
ii. The illumination and sound at night at project sites disturb the villages in respect
of both human and animal population. Consequent sleeping disorders and stress
may affect the health in the villages located close to mining operations.
Habitations have a right for darkness and minimal noise levels at night. PPs must
ensure that the biological clock of the villages is not disturbed; by orienting the
floodlights/ masks away from the villagers and keeping the noise levels well
within the prescribed limits for day /night hours.
iii. The Project Proponent shall take measures for control of noise levels below 85
dBA in the work environment. The workers engaged in operations of HEMM,
etc. should be provided with ear plugs/ muffs. All personnel including laborers
working in dusty areas shall be provided with protective respiratory devices along
with adequate training, awareness and information on safety and health aspects.
The PP shall be held responsible in case it has been found that workers/
personals/ laborers are working without personal protective equipment.
iv. The ambient noise level should confirm to the standards prescribed under E (P)
A Rules, 1986 viz 75 dB (A) during day time and 70 dB (A) during night time.
5. Mining plan:
i. The Project Proponent shall adhere to the working parameters of mining plan
which was submitted at the time of EC appraisal wherein year-wise plan was
mentioned for total excavation i.e. quantum of mineral, waste, over burden, inter
burden and top soil etc.. No change in basic mining proposal like mining
technology, total excavation, mineral & waste production, lease area and scope of
working (viz. method of mining, overburden & dump management , O.B & dump
mining, mineral transportation mode, ultimate depth of mining etc.) shall not be
carried out without prior approval of the Ministry of Environment, Forest and
Climate Change/ SEIAA, which entail adverse environmental impacts, even if it
is a part of approved mining plan modified after grant of EC or granted by State
Govt. in the form to Short Term Permit (STP), Query license or any other name.
ii. The Project Proponent shall get the Final Mine Closure Plan along with Financial
Assurance approved from Indian Bureau of Mines/Department of Mining &
Geology as required under the Provision of the MMDR Act, 1957 and Rules/
Guidelines made there under. A copy of approved final mine closure plan shall be
submitted within 2 months of the approval of the same from the competent
authority to the concerned Regional Office, MoEF & CC/ SEIAA/ SPCB for
record and verification.
Final minutes of 4.95th meeting held on 27-29 July, 2021
iii. The land-use of the mine lease area at various stages of mining scheme as well as
at the end-of-life shall be governed as per the approved Mining Plan. The
excavation vis-a-vis backfilling in the mine lease area and corresponding
afforestation to be raised in the reclaimed area shall be governed as per approved
mining plan. PP shall ensure the monitoring and management of rehabilitated
areas until the vegetation becomes self- sustaining. The compliance status shall be
submitted half-yearly to the MoEF & CC/ SEIAA/ SPCB and its concerned
Regional Office.
6. Land reclamation:
i. The Overburden (O.B.) generated during the mining operations shall be stacked at
earmarked OB dump site(s) only and it should not be kept active for a long period
of time. The physical parameters of the OB dumps like height, width and angle of
slope shall be governed as per the approved Mining Plan as per the
guidelines/circulars issued by D.G.M.S w.r.t. safety in mining operations shall be
strictly adhered to maintain the stability of top soil/OB dumps. The topsoil shall be
used for land reclamation and plantation.
ii. The reject/waste generated during the mining operations shall be stacked at
earmarked waste dump site(s) only. The physical parameters of the waste dumps
like height. width and angle of slope shall be governed as per the approved
Mining Plan as per the guidelines/circulars issued by DGMS w.r.t. safety in
mining operations shall be strictly adhered to maintain the stability of waste
dumps.
iii. The reclamation of waste dump sites shall be done in scientific manner as per the
Approved Mining Plan cum Progressive Mine Closure Plan.
iv. The slope of dumps shall be vegetated in scientific manner with suitable native
species to maintain the slope stability, prevent erosion and surface run off. The
selection of local species regulates local climatic parameters and help in
adaptation of plant species to the microclimate. The gullies formed on slopes
should be adequately taken care of as it impacts the overall stability of dumps. The
dump mass should be consolidated with the help of dozer/ compactors thereby
ensuring proper filling/ leveling of dump mass. In critical areas, use of geo
textiles/ geo-membranes / clay liners / Bentonite etc. shall be undertaken for
stabilization of the dump.
v. The Project Proponent shall carry out slope stability study in case the dump height
is more than 30 meters. The slope stability report shall be submitted to concerned
regional office of MoEF & CC/ RSPCB.
vi. Catch drains, settling tanks and siltation ponds of appropriate size shall be
Final minutes of 4.95th meeting held on 27-29 July, 2021
constructed around the mine working, mineral yards and Top Soil/OB/Waste
dumps to prevent run off of water and flow of sediments directly into the water
bodies (Nallah/ River/ Pond etc.). The collected water should be utilized for
watering the mine area, roads, green belt development, plantation etc. The drains/
sedimentation sumps etc. shall be de-silted regularly, particularly after monsoon
season, and maintained properly.
vii. Check dams of appropriate size, gradient and length shall be constructed around
mine pit and OB dumps to prevent storm run-off and sediment flow into adjoining
water bodies. A safety margin of 50% shall be kept for designing of sump
structures over and above peak rainfall (based on 50 years data) and maximum
discharge in the mine and its adjoining area which shall also help in providing
adequate retention time period thereby allowing proper settling of sediments/ silt
material. The sedimentation pits/ sumps shall be constructed at the corners of the
garland drains.
viii. The top soil, if any, shall temporarily be stored at earmarked site(s) within the
mine lease only and should not be kept unutilized for long. The physical
parameters of the top soil dumps like height, width and angle of slope shall be
governed as per the approved Mining Plan and as per the guidelines framed by
DGMS w.r.t. safety in mining operations shall be strictly adhered to maintain the
stability of dumps. The topsoil shall be used for land reclamation and plantation
purpose.
7. Transportation:
i. No Transportation of the minerals shall be allowed in case of roads passing through
villages/ habitations. In such cases, PP shall construct a 'bypass’ road for the
purpose of transportation of the minerals leaving an adequate gap (say at least 200
meters) so that the adverse impact of sound and dust along with chances of
accidents could be mitigated. All costs resulting from widening and strengthening
of existing public road network shall be borne by the PP in consultation with nodal
State Govt. Department. Transportation of minerals through road movement in
case of existing village/ rural roads shall be allowed in consultation with nodal
State Govt. Department only after required strengthening such that the carrying
capacity of roads is increased to handle the traffic load. The pollution due to
transportation load on the environment will be effectively controlled and water
sprinkling will also be done regularly. Vehicular emissions shall be kept under control
and regularly monitored. Project should obtain Pollution Under Control (PUC)
certificate for all the vehicles from authorized pollution testing centers.
ii. The Main haulage road within the mine lease should be provided with a permanent
water sprinkling arrangement for dust suppression. Other roads within the mine
lease should be wetted regularly with tanker-mounted water sprinkling system.
The other areas of dust generation like crushing zone, material transfer points,
material yards etc. should invariably be provided with dust suppression
Final minutes of 4.95th meeting held on 27-29 July, 2021
arrangements. The air pollution control equipments like bag filters, vacuum suction
hoods, dry fogging system etc. shall be installed at Crushers, belt-conveyors and
other areas prone to air pollution. The belt conveyor should be fully covered to
avoid generation of dust while transportation. PP shall take necessary measures to
avoid generation of fugitive dust emissions.
8. Green Belt:
i. The Project Proponent shall develop greenbelt in 7.5m wide safety zone all along the
mine lease boundary as per the guidelines of CPCB in order to arrest pollution
emanating from mining operations within the lease. The whole Green belt shall be
developed within first 5 years starting from windward side of the active mining area.
The development of greenbelt shall be governed as per the EC granted by the
Ministry/ SEIAA irrespective of the stipulation made in approved mine plan.
ii. The Project Proponent shall carryout plantation/ afforestation in backfilled and
reclaimed area of mining lease, around water body, along the roadsides, in
community areas etc. by planting the native species in consultation with the State
Forest Department/ Agriculture Department/ Rural development department/ Tribal
Welfare Department/ Gram Panchayat such that only those species be selected
which are of use to the local people. The CPCB guidelines in this respect shall
also be adhered. The density of the trees should be around 2500 saplings per
Hectare. Adequate budgetary provision shall be made for protection and care of
trees.
iii. The Project Proponent shall make necessary alternative arrangements for livestock
feed by developing grazing land with a view to compensate those areas which are
coming within the mine lease. The development of such grazing land shall be
done in consultation with the State Government. In this regard, Project Proponent
should essentially implement the directions of the Hon’b1e Supreme Court with
regard to acquisition of grazing land. The sparse trees on such grazing ground,
which provide mid-day shelter from the scorching sun, should be scrupulously
guarded/ protected against felling and plantation of such trees should be promoted.
iv. The Project Proponent shall undertake all precautionary measures for
conservation and protection of endangered flora and fauna and Schedule-I species
during mining operation. A Wildlife Conservation Plan shall be prepared for the
same clearly delineating action to be taken for conservation of flora and fauna.
The Plan shall be approved by Chief Wild Life Warden of the State Govt.
v. And implemented in consultation with the State Forest and Wildlife Department.
A copy of Wildlife Conservation Plan and its implementation status (annual) shall
be submitted to the Regional Office of the Ministry/ SEIAA.
9. Public hearing and human health issues:
Final minutes of 4.95th meeting held on 27-29 July, 2021
i. The Project Proponent shall appoint an Occupational Health Specialist for
Regular as well as Periodical medical examination of the workers engaged in the
mining activities, as per the DGMS guidelines. The records shall be maintained
properly. PP shall also carryout Occupational health check-ups in respect of
workers which are having ailments like nr, diabetes, habitual smoking, etc. The
check-ups shall be undertaken once in s1x months and necessary remedial/
preventive measures be taken. A status report on the same may be sent to MoEF &
CC/ SEIAA/ Regional Office and DGMS on half-yearly basis.
ii. The Project Proponent must demonstrate commitment to work towards ‘Zero
Harm’ from their mining activities and carry out Health Risk Assessment (HRA)
for identification workplace hazards and assess their potential risks to health and
determine appropriate control measures to protect the health and wellbeing of
workers and nearby community. The proponent shall maintain accurate and
systematic records of the HRA. The HRA for neighborhood has to focus on
Public Health Problems like Malaria, Tuberculosis, HIV, Anaemia, Diarrhoea in
children under five, respiratory infections due to bio mass cooking. The
proponent shall also create awareness and educate the nearby community and
workers for Sanitation, Personal Hygiene, Hand wasting, not to defecate in open,
Women Health and Hygiene (Providing Sanitary Napkins), hazard of tobacco and
alcohol use. The Proponent shall carryout base line HRA for all the category of
workers and thereafter every five years.
iii. The Proponent shall carry out Occupational health surveillance which be a part
of HRA and include Biological Monitoring where practical and feasible, and the
tests and investigations relevant to the exposure (e.g. for Dust a X-Ray chest; For
Noise Audiometric; for Lead Exposure Blood Lead, For Welders Full
Ophthalmologic Assessment; for Manganese Miners a complete Neurological
Assessment by a Certified Neurologist, and Manganese (Mn) Estimation in
Blood; For Inorganic Chromium- Fortnightly skin inspection of hands and
forearms by a responsible person. Except routine tests all tests would be carried
out in a Lab accredited by NABH. Records of Health Surveillance must be kept
for 30 years, including the results of and the records of Physical examination and
tests. The record of exposure due to materials like Asbestos. Hard Rock Mining,
Silica, Gold, Kaolin, Aluminium. Iron, Manganese, Chromium, Lead, Uranium
need to be handed over to the Mining Department of the State in case the life of
the mine is less than 30 years. It would be obligatory for the State Mines
Departments to make arrangements for the safe and secure storage of the records
including X-Ray. Only conventional X-Ray will be accepted for record purposes
and not the digital one). X-Ray must meet ILO criteria (17 x14 inches and of
good quality).
iv. The Proponent shall maintained a record of performance indicators for workers
which includes (a) there should not be a significant decline in their Body Mass
Index and it should stay between 18.5 -24.9, (b) the Final Chest X-Ray compared
with the base line X-Ray should not show any capacities ,(c) At the end of their
Final minutes of 4.95th meeting held on 27-29 July, 2021
leaving job there should be no Diminution in their Lung Functions Forced
Expiratory Volume in one second (FEV1),Forced Vital Capacity (FVC), and the
ratio) unless they are smokers which has to be adjusted, and the effect of age, (d)
their hearing should not be affected. As a proof an Audiogram (first and last need
to be presented), (e) they should not have developed any Persistent Back Pain,
Neck Pain, and the movement of their Hip, Knee and other joints should have
normal range of movement, (f) they should not have suffered loss of any body
part. The record of the same should be submitted to the Regional Office, MoEF &
CC/ SEIAA annually along with details of the relief and compensation paid to
workers having above indications.
v. The Project Proponent shall ensure that Personnel working in dusty areas should
wear protective respiratory devices and they should also be provided with
adequate training and information on safety and health aspects.
vi. Project Proponent shall make provision for the housing for workers/labors or
shall construct labor camps within/outside (company owned land) with necessary
basic infrastructure/ facilities like fuel for cooking, mobile toilets, mobile STP,
safe drinking water, medical health care, creche for kids etc. The housing may be
provided in the form of temporary structures which can be removed after the
completion of the project related infrastructure. The domestic waste water should
be treated with STP in order to avoid contamination of underground water.
vii. The activities proposed in Action plan prepared for addressing the issues raised
during the Public Hearing shall be completed as per the budgetary provisions
mentioned in the Action Plan and within the stipulated time frame. The Status
Report on implementation of Action Plan shall be submitted to the concerned
Regional Office o1 the Ministry along with District Administration.
10. Miscellaneous:
i. The Project Proponent shall prepare digital map (land use & land cover) of the
entire lease area once in five years purpose of monitoring land use pattern and
submit a report to concerned Regional Office of the MoEF & CC/ SEIAA/ SPCB.
ii. The Project Authorities should inform to the SEIAA/ Regional Office regarding
date of financial closures and final approval of the project by the concerned
authorities and the date of start of land development work.
iii. The Project Proponent shall submit six monthly compliance reports on the status
of the implementation of the stipulated environmental safeguards to the
MOEFCC & its concerned Regional Office, Central Pollution Control Board and
State Pollution Control Board.
iv. A separate ‘Environmental Management Cell’ with suitable qualified manpower
should be set-up under the control of a Senior Executive. The Senior Executive
Final minutes of 4.95th meeting held on 27-29 July, 2021
shall directly report to Head of the Organization. Adequate number of qualified
Environmental Scientists and Mining Engineers shall be appointed and submit a
report to RO, MoEF & CC/ SEIAA/ SPCB.
v. The MoEF & CC/ SEIAA/ SPCB shall randomly monitor compliance of the
stipulated conditions. The project authorities should extend full cooperation to the
MoEF & CC/ SEIAA/ SPCB officer(s) by furnishing the requisite data /
information / monitoring reports.
vi. Project Proponent shall keep the funds earmarked for environmental protection
measures in a separate account and refrain from diverting the same for other
purposes. The Year wise expenditure of such funds should be reported to the
MoEF & CC/ SEIAA/ SPCB and its concerned Regional Office.
Additional conditions recommended in view of OM dated 08.08.2019 of the MoEF &
CC (applicable where the project falls within a distance of 10 Km from the boundary of
National Park/ Wildlife Sanctuary and outside notified ESZ):
1. The mining activity should be carried out in a manner so that the water regime/system of
the sanctuary is not disturbed. The mining activity should not adversely affect any
existing water course, water body, catchment etc. The PP shall while carrying out mining
activity ensure compliance of the provisions of Air (Prevention and Control of Pollution)
Act 1981, Water (Prevention and Control of Pollution) Act 1974 and the Environment
(Protection) Act, 1986 so that the wildlife in the area is not adversely affected.
2. The processes like blasting, drilling, excavation, transport and haulage resulting into
noise, should be carried out in such an manner so that such activities do not disturb wild
animals and birds particularly during sunset to sunrise. The level of noise should be kept
within the permissible limits.
3. The mining activity should not create any obstacle in the way of free movement of
wildlife and adversely affect wildlife corridors.
4. The mineral waste/ slurry should be dumped only at the designated places only and such
waste dumps should be reclaimed in accordance with the conditions of the mining plan/
consent issued by the RSPCB under the Water and Air act.
5. The PP shall cooperate with the concerned DCF, Wildlife in their efforts towards
protection and conservation of wildlife in the Sanctuary/ Park.
6. The PP shall ensure that the transporter and labor employed by him should not damage
flora and fauna in the ESZ and the Wildlife Sanctuary/ National Park.
Specific Conditions applicable, in the cases of violation in terms of the Notification dated
14.3.2017 and 8.3.2018 and OMs dated 30.5.2018, 4.7.2018 of the MoEF & CC :
Final minutes of 4.95th meeting held on 27-29 July, 2021
1. The PP shall give an undertaking by way of affidavit to comply with all the statutory
requirements and judgment of the Hon’ble Supreme Court dated 02.08.2017 in the
matter of Writ Petition (Civil) No. 114 of 2014, Common Cause V/s Union of India &
others before grant of ToR/EC. The undertaking inter-alia include commitment of the PP
not to be repeat any such violation in future.
2. In case of violation of above undertaking/ affidavit, the ToR/EC shall be liable to be
terminated forthwith.
3. The environmental clearance will not be operational, till such time the Project Proponent
complies with all the statutory requirements and judgment of the Hon’ble Supreme
Court dated 02.08.2017 in the matter of Writ Petition (Civil) No. 114 of 2014, Common
Cause V/s Union of India & others.
4. The department of Mines & Geology shall ensure that the mining operations shall not
commence till the entire compensation levied, if any, for illegal mining, is paid, by the
Project Proponent through the Department of Mines and Geology, in strict compliance of
the judgment of the Hon’ble Supreme Court dated 02.08.2017 in the matter of Writ
Petition (Civil) No. 114 of 2014, Common Cause V/s Union of India & others.
Final minutes of 4.95th meeting held on 27-29 July, 2021
AANNNNEEXXUURREE--““BB””
TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT
IMPACT ASSESSMENT STUDY FOR NON-COAL MINING PROJECTS AND
INFORMATION TO BE INCLUDED IN EIA/EMP REPORT
1) Year-wise production details since 1994 should be given, clearly stating the highest
production achieved in any one year prior to 1994. It may also be categorically informed
whether there had been any increase in production after the EIA Notification 1994 came into
force, w.r.t. the highest production achieved prior to 1994.
2) A copy of the document in support of the fact that the Proponent is the rightful lessee of the
mine should be given.
3) All documents including approved mine plan, EIA and Public Hearing should be compatible
with one another in terms of the mine lease area, production levels, waste generation and its
management, mining technology etc. and should be in the name of the lessee.
4) All corner coordinates of the mine lease area, superimposed on a High Resolution Imagery/
toposheet, topographic sheet, geomorphology and geology of the areashould be provided.
Such an Imagery of the proposed area should clearly show the land use and other ecological
features of the study area (core and buffer zone).
5) Information should be provided in Survey of India Toposheet in 1:50,000 scale indicating
geological map of the area, geomorphology of land forms of the area, existing minerals and
mining history of the area, important water bodies, streams and rivers and soil characteristics.
6) Details about the land proposed for mining activities should be givenwith information as to
whether mining conforms to the land use policy of the State; land diversion for mining should
have approval from State land use board or the concerned authority.
7) It should be clearly stated whether the Proponent Company has a well laid down
Environment Policy approved by its Board of Directors? If so, it may be spelt out in the EIA
Report with description of the prescribed operating process/procedures to bring into focus
any infringement/deviation/ violation of the environmental or forest norms/ conditions? The
hierarchical system or administrative order of the Company to deal with the environmental
issues and for ensuring compliance with the EC conditions may also be given. The system of
reporting of non-compliances / violations of environmental norms to the Board of Directors
of the Company and/or shareholders or stakeholders at large,may also be detailed in the EIA
Report.
8) Issues relating to Mine Safety, including subsidence study in case of underground mining and
slope study in case of open cast mining, blasting study etc. should be detailed. The proposed
safeguard measures in each case should also be provided.
9) The study rea will comprise of 10 km zone around the mine lease from lease periphery and
the data contained in the EIA such as waste generation etc. should be for the life of the mine /
lease period.
Final minutes of 4.95th meeting held on 27-29 July, 2021
10) Land use of the study rea delineating forest area, agricultural land, grazing land, wildlife
sanctuary, national park, migratory routes of fauna, water bodies, human settlements and
other ecological features should be indicated. Land use plan of the mine lease area should be
prepared to encompass preoperational, operational and post operational phases and submitted.
Impact, if any, of change of land use should be given.
11) Details of the land for any Over Burden Dumps outside the mine lease, such as extent of
land area, distance from mine lease, its land use, R&R issues, if any, should be given.
12) A Certificate from the Competent Authority in the State Forest Department should be
provided, confirming the involvement of forest land, if any, in the project area. In the event of
any contrary claim by the Project Proponent regarding the status of forests, the site may be
inspected by the State Forest Department along with the Regional Office of the Ministry to
ascertain the status of forests, based on which, the Certificate in this regard as mentioned
above be issued. In all such cases, it would be desirable for representative of the State Forest
Department to assist the Expert Appraisal Committees.
13) Status of forestry clearance for the broken up area and virgin forestland involved in the
Project including deposition of net present value (NPV) and compensatory afforestation (CA)
should be indicated. A copy of the forestry clearance should also be furnished.
14) Implementation status of recognition of forest rights under the Scheduled Tribes and other
Traditional Forest Dwellers (Recognition of Forest Rights) Act, 2006 should be indicated.
15) The vegetation in the RF / PF areas in the study area, with necessary details, should be
given.
16) A study shall be got done to ascertain the impact of the Mining Project on wildlife of the
study area and details furnished. Impact of the project on the wildlife in the surrounding and
any other protected area and accordingly, detailed mitigative measures required, should be
worked out with cost implications and submitted.
17) Location of National Parks, Sanctuaries, Biosphere Reserves, Wildlife Corridors, Ramsar
site Tiger/ Elephant Reserves/(existing as well as proposed), if any, within 10 km of the mine
lease should be clearly indicated, supported by a location map duly authenticated by Chief
Wildlife Warden. Necessary clearance, as may be applicable to such projects due to
proximity of the ecologically sensitive areas as mentioned above, should be obtained from the
Standing Committee of National Board of Wildlife and copy furnished.
18) A detailed biological study of the study area [core zone and buffer zone (10 km radius of the
periphery of the mine lease)] shall be carried out. Details of flora and fauna, endangered,
endemic and RET Species duly authenticated, separately for core and buffer zone should be
furnished based on such primary field survey, clearly indicating the Schedule of the fauna
present. In case of any scheduled-I fauna found in the study area, the necessary plan
alongwith budgetary provisions for their conservation should be prepared in consultation with
State Forest and Wildlife Department and details furnished. Necessary allocation of funds for
implementing the same should be made as part of the project cost.
Final minutes of 4.95th meeting held on 27-29 July, 2021
19) Proximity to Areas declared as 'Critically Polluted' or the Project areas likely to come under
the 'Aravali Range', (attracting court restrictions for mining operations), should also be
indicated and where so required, clearance certifications from the prescribed Authorities,
such as the SPCB or State Mining Department should be secured and furnished to the effect
that the proposed mining activities could be considered.
20) R&R Plan/compensation details for the Project Affected People (PAP) should be furnished.
While preparing the R&R Plan, the relevant State/National Rehabilitation & Resettlement
Policy should be kept in view. In respect of SCs /STs and other weaker sections of the society
in the study area, a need based sample survey, family-wise, should be undertaken to assess
their requirements, and action programmes prepared and submitted accordingly, integrating
the sectoral programmes of line departments of the State Government. It may be clearly
brought out whether the village(s) located in the mine lease area will be shifted or not. The
issues relating to shifting of village(s) including their R&R and socio-economic aspects
should be discussed in the Report.
21) One season (non-monsoon) [i.e. March-May (Summer Season); October-December (post
monsoon season) ; December-February (winter season)]primary baseline data on ambient air
quality as per CPCB Notification of 2009, water quality, noise level, soil and flora and fauna
shall be collected and the AAQ and other data so compiled presented date-wise in the EIA
and EMP Report. Site-specific meteorological data should also be collected. The location of
the monitoring stations should be such as to represent whole of the study area and justified
keeping in view the pre-dominant downwind direction and location of sensitive receptors.
There should be at least one monitoring station within 500 m of the mine lease in the pre-
dominant downwind direction. The mineralogical composition of PM10, particularly for free
silica, should be given.
22) Air quality modeling should be carried out for prediction of impact of the project on the air
quality of the area. It should also take into account the impact of movement of vehicles for
transportation of mineral. The details of the model used and input parameters used for
modeling should be provided. The air quality contours may be shown on a location map
clearly indicating the location of the site, location of sensitive receptors, if any, and the
habitation. The wind roses showing pre-dominant wind direction may also be indicated on the
map.
23) The water requirement for the Project, its availability and source should be furnished. A
detailed water balance should also be provided. Fresh water requirement for the Project
should be indicated.
24) Necessary clearance from the Competent Authority for drawl of requisite quantity of water
for the Project should be provided.
25) Description of water conservation measures proposed to be adopted in the Project should be
given. Details of rainwater harvesting proposed in the Project, if any, should be provided.
26) Impact of the Project on the water quality, both surface and groundwater, should be assessed
and necessary safeguard measures, if any required, should be provided.
Final minutes of 4.95th meeting held on 27-29 July, 2021
27) Based on actual monitored data, it may clearly be shown whether working will intersect
groundwater. Necessary data and documentation in this regard may be provided. In case the
working will intersect groundwater table, a detailed Hydro Geological Study should be
undertaken and Report furnished. The Report inter-alia, shall include details of the aquifers
present and impact of mining activities on these aquifers. Necessary permission from Central
Ground Water Authority for working below ground water and for pumping of ground water
should also be obtained and copy furnished.
28) Details of any stream, seasonal or otherwise, passing through the lease area and modification
/ diversion proposed, if any, and the impact of the same on the hydrology should be brought
out.
29) Information on site elevation, working depth, groundwater table etc. Should be provided
both in AMSL and bgl. A schematic diagram may also be provided for the same.
30) A time bound Progressive Greenbelt Development Plan shall be prepared in a tabular form
(indicating the linear and quantitative coverage, plant species and time frame) and submitted,
keeping in mind, the same will have to be executed up front on commencement of the
Project. Phase-wise plan of plantation and compensatory afforestation should be charted
clearly indicating the area to be covered under plantation and the species to be planted. The
details of plantation already done should begiven. The plant species selected for green belt
should have greater ecological value and should be of good utility value to the local
population with emphasis on local and native species and the species which are tolerant to
pollution.
31) Impact on local transport infrastructure due to the Project should be indicated. Projected
increase in truck traffic as a result of the Project in the present road network (including those
outside the Project area) should be worked out, indicating whether it is capable of handling
the incremental load. Arrangement for improving the infrastructure, if contemplated
(including action to be taken by other agencies such as State Government) should be covered.
Project Proponent shall conduct Impact of Transportation study as per Indian Road Congress
Guidelines.
32) Details of the onsite shelter and facilities to be provided to the mine workers should be
included in the EIA Report.
33) Conceptual post mining land use and Reclamation and Restoration of mined out areas (with
plans and with adequate number of sections) should be given in the EIA report.
34) Occupational Health impacts of the Project should be anticipated and the proposed preventive
measures spelt out in detail. Details of pre-placement medical examination and periodical
medical examination schedules should be incorporated in the EMP. The project specific
occupational health mitigation measures with required facilities proposed in the mining area
may be detailed.
35) Public health implications of the Project and related activities for the population in the impact
zone should be systematically evaluated and the proposed remedial measures should be
detailed along with budgetary allocations.
Final minutes of 4.95th meeting held on 27-29 July, 2021
36) Measures of socio economic significance and influence to the local community proposed to be
provided by the Project Proponent should be indicated. As far as possible, quantitative
dimensions may be given with time frames for implementation.
37) Detailed environmental management plan (EMP) to mitigate the environmental impacts
which, should inter-alia include the impacts of change of land use, loss of agricultural and
grazing land, if any, occupational health impacts besides other impacts specific to the
proposed Project.
38) Public Hearing points raised and commitment of the Project Proponent on the same along
with time bound Action Plan with budgetary provisions to implement the same should be
provided and also incorporated in the final EIA/EMP Report of the Project.
39) Details of litigation pending against the project, if any, with direction /order passed by any
Court of Law against the Project should be given.
40) The cost of the Project (capital cost and recurring cost) as well as the cost towards
implementation of EMP should be clearly spelt out.
41) A Disaster management Plan shall be prepared and included in the EIA/EMP Report.
42) Benefits of the Project if the Project is implemented should be spelt out. The benefits of the
Project shall clearly indicate environmental, social, economic, employment potential, etc.
43) Besides the above, the below mentioned general points are also to be followed:-
a) Executive Summary of the EIA/EMP Report
b) All documents to be properly referenced with index and continuous page numbering.
c) Where data are presented in the Report especially in Tables, the period in which the data
were collected and the sources should be indicated.
d) Project Proponent shall enclose all the analysis/testing reports of water, air, soil, noise etc.
using the MoEF&CC/NABL accredited laboratories. All the original analysis/testing reports
should be available during appraisal of the Project.
e) Where the documents provided are in a language other than English, an English translation
should be provided.
f) The Questionnaire for environmental appraisal of mining projects as devised earlier by the
Ministry shall also be filled and submitted.
g) While preparing the EIA report, the instructions for the Proponents and instructions for
the Consultants issued by MoEF&CC vide O.M. No. J-11013/41/2006-IA.II(I) dated 4th
August, 2009, which are available on the website of this Ministry, should be followed.
h) Changes, if any made in the basic scope and project parameters (as submitted in Form-I
and the PFR for securing the TOR) should be brought to the attention of MoEF&CC with
reasons for such changes and permission should be sought, as the TOR may also have to be
altered. Post Public Hearing changes in structure and content of the draft EIA/EMP (other
Final minutes of 4.95th meeting held on 27-29 July, 2021
than modifications arising out of the P.H. process) will entail conducting the PH again with
the revised documentation.
i) As per the circular no. J-11011/618/2010-IA.II(I) dated 30.5.2012, certified report of the
status of compliance of the conditions stipulated in the environment clearance for the existing
operations of the project, should be obtained from the Regional Office of Ministry
ofEnvironment, Forest and Climate Change, as may be applicable.
j) The EIA report should also include (i) surface plan of the area indicating contours of main
topographic features, drainage and mining area, (ii) geological maps and sections and (iii)
sections of the mine pit and external dumps, if any, clearly showing the land features of the
adjoining area.
Specific ToR in the cases of cluster situation:
1. The PP shall conduct Environmental Impact Assessment Study and prepare
Environmental Management Plan for the entire cluster in order to capture all the possible
externalities. These reports are required to incorporate carrying capacity of the cluster,
transportation and related issues, replenishment and recharge issues, geo- hydrological
study of the cluster.
2. The EIA/EMP shall be prepared by the state or state nominated agency or group of PP in
the cluster or the PP in the cluster. The PP shall get one public consultation done for the
entire cluster and after which prepare final EIA/EMP reports.
Specific ToRs applicable, in the cases of violation in terms of the Notification dated
14.3.2017 and 8.3.2018 and OMs dated 30.5.2018, 4.7.2018 of the MoEF & CC :
1. The PP shall undertake assessment of ecological damage, remediation plan and
natural and community resource augmentation plan. Such plan shall be prepared as an
independent chapter in the Environment Impact Assessment report. The report shall
be prepared by the accredited consultant. Collection and analyses of data for
assessment of ecological damage, preparation of remediation plan and natural and
community resource augmentation plan shall be done by an environmental laboratory
duly notified under the Environment (Protection) Act, 1986 or an environmental
Laboratory, accredited by the National Accreditation Board for Testing and
Calibration Laboratories or a Laboratory of the Council of Scientific and Industrial
Research Institution working in the field of environment.
2. The Environment Management Plan shall comprise remediation plan and natural and
community resource augmentation plan corresponding to ecological damage assessed
and economic benefit derived due to the violation.
3. The PP shall undertake Final Environment Impact Assessment and prepare Final
Environment Management Plan after conducting Public Hearing.
4. The PP shall be required to submit a bank guarantee equivalent to the amount of
remediation plan and natural and community resource augmentation plan with the
State Pollution Control Board and the PP shall deposit the bank guarantee prior to the
grant of Environmental Clearance and which shall be released after successful
implementation of the remediation plan and natural and community resource
Final minutes of 4.95th meeting held on 27-29 July, 2021
augmentation plan and after recommendation by Regional Office of the Ministry,
State Level Expert Appraisal Committee and approval of SEIAA.
5. The project Proponent shall give an undertaking by way of affidavit to comply with
all the statutory requirements and judgment of Hon’ble Supreme Court dated the 2nd
August 2017 in Writ Petition (Civil) No. 114 of 2014 in the matter of Common Cause
versus Union of India and Ors. before grant of ToR/ EC the undertaking inter-alia
include commitment of the PP not to repeat any such violation in future.
6. In case of violation of above undertaking, the Environmental Clearance shall be liable
to be terminated forthwith as per OM dated 30.5.2018 of the MoEF&CC.
7. The Environmental Clearance will not be operational till such time the project
Proponent complies with all the statutory requirements and judgment of Hon’ble
Supreme Court dated the 2nd August 2017 in Writ Petition (Civil) No. 114 of 2014 in
the matter of Common Cause versus Union of India and Ors.
8. State Government concerned shall ensure that mining operation shall not commence
till the entire compensation levied, if any, for illegal mining is paid by the Project
Proponent through their respective Department of Mining & Geology in strict
compliance of judgment of Hon’ble Supreme Court dated 2nd August 2017 in Writ
Petition (Civil) No. 114 of 2014 in the matter of Common Cause versus Union of
India and Ors.
The validity period of this ToRs letter would be for a period of four years from the date of
dispatch of the ToRs letter.
S. No Items in the letter of the ToRs Reply / Response by the PP