List of projects used in HKIA/ARB Professional Assessment ...

60
List of projects used in HKIA/ARB Professional Assessment 2007 - 2014 No Year Name of Company Project Title Address Lot No BD File Ref. Date of Occupation Permit / Practical Completion (month/year) Special Topic 1 2007 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate Section G Tai Po Town Lot BD 2/9141/01 (P) Jan 04 2 2007 AGC Design Ltd Proposed Hotel Development at 31E - 39 Wyndham Street, Central 31E, 31F, 33-39 Wyndham Street, Central, Hong Kong IL7076, IL7077, IL971, IL970 SARP, IL970RP, IL970SBSS1 RP BD3/2058/94 PT IV Jul 04 3 2007 Aedas Ltd Extension to the Church of Jesus Christ of Latter Day Saints at Tseung Kwan O Tseung Kwan O Lot 45, Area II, Po Lam Lane Tseung Kwan O Lot 45 BD 9106/04 31 Oct 2006 4 2007 P & T Architects & Engineers Ltd Residential Development At 2 Lok Kwai Path Shatin, 2 Lok Kwai Path, Shatin, N.T. STTL 526 BD 9067/02 Jan 06 / May 06 5 2007 Leung King Partners Ltd Villa Rosa Residents 82 Peak Road, Hong Kong RBL 742 BD 2014/98 Aug 00 6 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 4C, TMTL 384 King Fung Path, Tuen Mun, N.T. Lot No. 384, Area 4C BD 6/9260/97H (P) Aug 02 7 2007 MLA Architects (HK) Ltd Service Apartment Building at Nos. 116-122, Yeung Uk Road (H-Cube) 116-122 Yeung Uk Road, Tsuen Wan, N.T. TWTL 407 9325/93 28 Aug 06 8 2007 Simon Kwan Architect & Associates Ltd Anglers' Bay Residential Development 18A Castle Peak Road, Sham Tseng, Tsuen Wan 214, DD387 BD 9022/01 19 Oct 04 / 22 Dec 04 9 2007 CYS Associates (HK) Ltd Residential Re-development at Nam Wai Nam Wai, Sai Kung 999 in DD214 9194/05 Nov 07 10 2007 Aedas Ltd Landmark East 12 Ice House Street - 16 Des Voeux Road Central IL3087 2/2060/74 28 Nov 06 11 2007 Architecture Design & Research Group Ltd Hong Kong Community College Development at West Kowloon J/O Hoi Ting Road and Hoi Wang Road KIL 11176 BD 2/4050/05 15 June 07 12 2007 Ove Arup & Partner (HK) Ltd Provision of Tunnel Ventilation System For Beacon Hill Tunnel Beacon Hill, Kowloon Hill N/A, KCRC Vested Land 2/7977/03 (TWVB) (P) O. P Obtained July 07 13 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Comprehensive Development at Lot No 11127, 8 Fuk Lee Street, Kowloon No 201 Tai Kok Tsui Road and Fuk Lee Street, Kowloon KIL No 11127 BD 2-3/4024/99 Phase 1 OP - 12/2002 ; Phase 2 OP - 07/2003 14 2007 Hong Kong Housing Authority Shek Kip Mei Redevelopment Phase 1 Shek Kip Mei Estate, Mei Ying House & Mei Yue House Housing Authority Vesting Order No. 32 HD(ICU) BI 2/KL48 RR/01 May 06 15 2007 Ronald Lu & Partners (HK) Ltd Choi Hung Park and Ride Development Clear Water Bay Road, Kowloon NKIL 6179 BD 2/7182/95 Dec 05 16 2007 Aedas Ltd Hong Kong Jockey Club Shatin Race course Parade Ring Redevelopment Shatin STTL 13 2/9091/03 Nov 04 17 2007 Eddie Chan Architects Limited Phase II, Floral Villas 18 Tso Wo Road, Tso Wo Hang, Sai Lot No. 314 in D. D. 252 BD 2/9188/04 18 July 2007, 4 May 2007 18 2007 Simon Kwan Architect & Associates Ltd Redevelopment of Marymount Primary School and Improvement of Marymount Secondary School 336-338 Tai Hang Road and 123 Blue Pool Road IL 8549 and IL 8499 BD 3075/02(P) 21 Jul 06 19 2007 Leigh & Orange Ltd School Improvement Programme Ph2 P5 Group 8: Extension to P17II Pui Tak Canossian Primary School 18 Aberdeen Main Road, Hong Kong AIL 174 BD 2/2038/96H (P) Jan 04 (OP), Oct 03 (PC) 20 2007 Architectural Services Department Science Park at Pak Shek Kok Phase IC - Building 9 5 Science Park West Avenue, Hong Kong Science Park, Pak Shek Kok TPTL 171 ASD 51/6440 Y Jun 04 21 2007 Leigh & Orange Ltd Redevelopment of Teaching Building Chung Chi College Phase V The Chinese University of Hong Kong, Shatin, NT STTL 437 STTL 437 BD 4/9327/94(P) 31 Aug 00 22 2007 Associated Architects Ltd Proposed Development of Composite Building 18 Fuk Lo Tsun Road, Kowloon City, Kowloon 2724SA 2/4002/98 Sep 02 23 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works to Cinemas, Festival Walk Level 1 to 2A Festival Walk, Tat Chee Avenue, Yau Yat Tseng, NKIL 6181, NKIL 6181 2-3/4055/93/15 Dec 06 24 2007 AGC Design Ltd School Improvement Programme (Final Phase) for Fortrees Hill Methodist School 19 Fortress Hill, North Point, Hong Kong Government Land (THK- 1220) 20 Nov 04 (Phase 1) and 11 Sep 04 (Phase 2) 25 2007 Wong & Ouyang (HK) Ltd Residential Redevelopment 35 Deep Water Bay Road, Hong Kong RBL 536 & Ext BD 2/3002/00 Mar 03 26 2007 David S.K. Au & Associates Ltd Proposed Printing Factory Industrial Estate, Tseung Kwan O TKOTL 39, S.S.1, S.H. N.T. BD 2/9252/96(P) Around Oct 07 27 2007 Aedas Ltd MTRCL Tung Chung Cable Car Ngong Ping Theme Village Ngong Ping Road, Lantau Lot No. 238 in D. D. Ngong Ping BD 2/9905/03 (NPTV) (P) May 06 28 2007 Hong Kong Housing Department Aldrich Bay Phase 5, Market Complex Aldrich Bay Road, Shau Kei Wan, Hong HK11NR N.A. Aug 07 29 2007 AGC Design Ltd Proposed Commercial Redevelopment of New Port Theatre at 23-29 Jordan Road, Kowloon 23-29 Jordan Road, Kowloon KIL 1301 S.ASS 12 R.P., SASS II R.P., SA10R.P. and BD 4033/99 Oct 03 30 2007 Aedas Ltd The Luxe Manor (A&A) 39 Kimberley Road, Tsim Sha Tsui KIL 7466, 7460, 7424, 6843 BD SM 4174/79 6 Jun 07 31 2007 Aedas Ltd Wanchai Chapel 118 Gloucester Road, Wanchai IL8909 BD 2/3028/00 Oct 04 / Mar 05 32 2007 MLA Architects (HK) Ltd Residential Development At Ngau Tam Mei, Phase 2, Yuen Long Ngau Tam Mei, N.T. 2094 in D.D. 105, Yuen Long BD 9192/00 8 Dec 04 33 2007 Andrew Lee King Fun & Associates Architects Ltd 100 QRC 100 Queen's Road Central IL 23 R.P. BD 2057/01 Sep 06 / Oct 06 34 2007 Spence Robinson LT Ltd Hotel Development at 46-48 Anchor Street 46-48 Anchor Street, Tai Kok Tsui KIL 6374 4/4028/01 Mar 2005 35 2007 Aedas Ltd Stanley Main Beach, Watersports Centre Stanley Main Beach, Tam Tam Wan -- ASD Ref: 302154181SSH3251 M151520 28 Sep 04 36 2007 Arthur C.S. Kwok Architects & Associates Ltd School Improvement Programme, Final Phase Self- Delivery Mode (S290 - La Salle College) 18 La Salle Road, Kowloon NKIL 1127 R.P. BD 3025/02(P) 30 May 05 37 2007 DesignVision Architects Ltd The Proposed Campus Redevelopment for China Graduate School of Theology 4 & 5 Devon Road, Kowloon Tong NKIL 894 2/4026/98 Dec 00 38 2007 P & T Architects & Engineers Ltd Residential Development at RBL 1142 South Bay Road Adjoining No. 14 South Bay Road, Repulse Bay, Hong Kong R.B.L. 1142 31 Dec 02 39 2007 Ronald Lu & Partners (HK) Ltd SIP Final Phase (Package 4) - Group 5 S285 - Jockey Club TI-I College Lok King Street, Fo Tan, Shatin Shatin Town Lot 324 BD 2/3130/01(P) Oct 05 40 2007 K & W Architects Limited A&A Works on Godown Extension at Gemstar Tower J/O Man Lok Street, Man Yue Street, Hung Hom Road H.H.I.L. No. 545 BD 2/4062/98 24 Jul 06 (OP) 41 2007 Chung Wah Nan Architects Ltd Sandwich Class Housing Project, Sunshine Grove Area 14J, Tak Yi Street, Shatin STTL 430 BD 2/9203/95H(P) May 1998 42 2007 Leigh & Orange Ltd ASD School Improvement Programme Phase IV, Package 2, Group 6, Good Shepherd Primary School 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 4/3086/01(P) 6 Jan 05

Transcript of List of projects used in HKIA/ARB Professional Assessment ...

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1 2007 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate Section G Tai Po Town Lot BD 2/9141/01 (P) Jan 04

2 2007 AGC Design Ltd Proposed Hotel Development at 31E - 39 WyndhamStreet, Central

31E, 31F, 33-39 Wyndham Street,Central, Hong Kong

IL7076, IL7077, IL971, IL970SARP, IL970RP,IL970SBSS1 RP

BD3/2058/94 PT IV Jul 04

3 2007 Aedas Ltd Extension to the Church of Jesus Christ of Latter DaySaints at Tseung Kwan O

Tseung Kwan O Lot 45, Area II, Po LamLane Tseung Kwan O Lot 45 BD 9106/04 31 Oct 2006

4 2007 P & T Architects & Engineers Ltd Residential Development At 2 Lok Kwai Path Shatin, 2 Lok Kwai Path, Shatin, N.T. STTL 526 BD 9067/02 Jan 06 / May 065 2007 Leung King Partners Ltd Villa Rosa Residents 82 Peak Road, Hong Kong RBL 742 BD 2014/98 Aug 006 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 4C, TMTL 384 King Fung Path, Tuen Mun, N.T. Lot No. 384, Area 4C BD 6/9260/97H (P) Aug 02

7 2007 MLA Architects (HK) Ltd Service Apartment Building at Nos. 116-122, Yeung UkRoad (H-Cube)

116-122 Yeung Uk Road, Tsuen Wan,N.T. TWTL 407 9325/93 28 Aug 06

8 2007 Simon Kwan Architect & Associates Ltd Anglers' Bay Residential Development 18A Castle Peak Road, Sham Tseng,Tsuen Wan 214, DD387 BD 9022/01 19 Oct 04 / 22 Dec 04

9 2007 CYS Associates (HK) Ltd Residential Re-development at Nam Wai Nam Wai, Sai Kung 999 in DD214 9194/05 Nov 07

10 2007 Aedas Ltd Landmark East 12 Ice House Street - 16 Des Voeux RoadCentral IL3087 2/2060/74 28 Nov 06

11 2007 Architecture Design & Research Group Ltd Hong Kong Community College Development at WestKowloon J/O Hoi Ting Road and Hoi Wang Road KIL 11176 BD 2/4050/05 15 June 07

12 2007 Ove Arup & Partner (HK) Ltd Provision of Tunnel Ventilation System For Beacon HillTunnel Beacon Hill, Kowloon Hill N/A, KCRC Vested Land 2/7977/03 (TWVB)

(P) O. P Obtained July 07

13 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Comprehensive Development at Lot No 11127, 8 FukLee Street, Kowloon

No 201 Tai Kok Tsui Road and Fuk LeeStreet, Kowloon KIL No 11127 BD 2-3/4024/99 Phase 1 OP - 12/2002 ;

Phase 2 OP - 07/2003

14 2007 Hong Kong Housing Authority Shek Kip Mei Redevelopment Phase 1 Shek Kip Mei Estate, Mei Ying House &Mei Yue House

Housing Authority VestingOrder No. 32

HD(ICU) BI 2/KL48RR/01 May 06

15 2007 Ronald Lu & Partners (HK) Ltd Choi Hung Park and Ride Development Clear Water Bay Road, Kowloon NKIL 6179 BD 2/7182/95 Dec 05

16 2007 Aedas Ltd Hong Kong Jockey Club Shatin Race course ParadeRing Redevelopment Shatin STTL 13 2/9091/03 Nov 04

17 2007 Eddie Chan Architects Limited Phase II, Floral Villas 18 Tso Wo Road, Tso Wo Hang, Sai Lot No. 314 in D. D. 252 BD 2/9188/04 18 July 2007, 4 May 2007

18 2007 Simon Kwan Architect & Associates Ltd Redevelopment of Marymount Primary School andImprovement of Marymount Secondary School

336-338 Tai Hang Road and 123 BluePool Road IL 8549 and IL 8499 BD 3075/02(P) 21 Jul 06

19 2007 Leigh & Orange Ltd School Improvement Programme Ph2 P5 Group 8:Extension to P17II Pui Tak Canossian Primary School 18 Aberdeen Main Road, Hong Kong AIL 174 BD 2/2038/96H (P) Jan 04 (OP), Oct 03 (PC)

20 2007 Architectural Services Department Science Park at Pak Shek Kok Phase IC - Building 9 5 Science Park West Avenue, Hong KongScience Park, Pak Shek Kok TPTL 171 ASD 51/6440 Y Jun 04

21 2007 Leigh & Orange Ltd Redevelopment of Teaching Building Chung ChiCollege Phase V

The Chinese University of Hong Kong,Shatin, NT STTL 437 STTL 437 BD 4/9327/94(P) 31 Aug 00

22 2007 Associated Architects Ltd Proposed Development of Composite Building 18 Fuk Lo Tsun Road, Kowloon City,Kowloon 2724SA 2/4002/98 Sep 02

23 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works to Cinemas, Festival Walk Level 1 to 2A Festival Walk, Tat CheeAvenue, Yau Yat Tseng, NKIL 6181, NKIL 6181 2-3/4055/93/15 Dec 06

24 2007 AGC Design Ltd School Improvement Programme (Final Phase) forFortrees Hill Methodist School 19 Fortress Hill, North Point, Hong Kong Government Land (THK-

1220) 20 Nov 04 (Phase 1) and11 Sep 04 (Phase 2)

25 2007 Wong & Ouyang (HK) Ltd Residential Redevelopment 35 Deep Water Bay Road, Hong Kong RBL 536 & Ext BD 2/3002/00 Mar 0326 2007 David S.K. Au & Associates Ltd Proposed Printing Factory Industrial Estate, Tseung Kwan O TKOTL 39, S.S.1, S.H. N.T. BD 2/9252/96(P) Around Oct 07

27 2007 Aedas Ltd MTRCL Tung Chung Cable Car Ngong Ping ThemeVillage Ngong Ping Road, Lantau Lot No. 238 in D. D. Ngong

PingBD 2/9905/03 (NPTV)(P) May 06

28 2007 Hong Kong Housing Department Aldrich Bay Phase 5, Market Complex Aldrich Bay Road, Shau Kei Wan, Hong HK11NR N.A. Aug 07

29 2007 AGC Design Ltd Proposed Commercial Redevelopment of New PortTheatre at 23-29 Jordan Road, Kowloon 23-29 Jordan Road, Kowloon KIL 1301 S.ASS 12 R.P.,

SASS II R.P., SA10R.P. and BD 4033/99 Oct 03

30 2007 Aedas Ltd The Luxe Manor (A&A) 39 Kimberley Road, Tsim Sha Tsui KIL 7466, 7460, 7424, 6843 BD SM 4174/79 6 Jun 0731 2007 Aedas Ltd Wanchai Chapel 118 Gloucester Road, Wanchai IL8909 BD 2/3028/00 Oct 04 / Mar 05

32 2007 MLA Architects (HK) Ltd Residential Development At Ngau Tam Mei, Phase 2,Yuen Long Ngau Tam Mei, N.T. 2094 in D.D. 105, Yuen Long BD 9192/00 8 Dec 04

33 2007 Andrew Lee King Fun & Associates Architects Ltd 100 QRC 100 Queen's Road Central IL 23 R.P. BD 2057/01 Sep 06 / Oct 0634 2007 Spence Robinson LT Ltd Hotel Development at 46-48 Anchor Street 46-48 Anchor Street, Tai Kok Tsui KIL 6374 4/4028/01 Mar 2005

35 2007 Aedas Ltd Stanley Main Beach, Watersports Centre Stanley Main Beach, Tam Tam Wan --ASD Ref:302154181SSH3251M151520

28 Sep 04

36 2007 Arthur C.S. Kwok Architects & Associates Ltd School Improvement Programme, Final Phase Self-Delivery Mode (S290 - La Salle College) 18 La Salle Road, Kowloon NKIL 1127 R.P. BD 3025/02(P) 30 May 05

37 2007 DesignVision Architects Ltd The Proposed Campus Redevelopment for ChinaGraduate School of Theology 4 & 5 Devon Road, Kowloon Tong NKIL 894 2/4026/98 Dec 00

38 2007 P & T Architects & Engineers Ltd Residential Development at RBL 1142 South Bay Road Adjoining No. 14 South Bay Road,Repulse Bay, Hong Kong R.B.L. 1142 31 Dec 02

39 2007 Ronald Lu & Partners (HK) Ltd SIP Final Phase (Package 4) - Group 5 S285 - JockeyClub TI-I College Lok King Street, Fo Tan, Shatin Shatin Town Lot 324 BD 2/3130/01(P) Oct 05

40 2007 K & W Architects Limited A&A Works on Godown Extension at Gemstar Tower J/O Man Lok Street, Man Yue Street,Hung Hom Road H.H.I.L. No. 545 BD 2/4062/98 24 Jul 06 (OP)

41 2007 Chung Wah Nan Architects Ltd Sandwich Class Housing Project, Sunshine Grove Area 14J, Tak Yi Street, Shatin STTL 430 BD 2/9203/95H(P) May 1998

42 2007 Leigh & Orange Ltd ASD School Improvement Programme Phase IV,Package 2, Group 6, Good Shepherd Primary School 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 4/3086/01(P) 6 Jan 05

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

43 2007 Ma & Fong & Associates Ltd Proposed House Development at RBL 1133, South BayRoad, Repulse Bay RBL 1133, South Bay Road, Repulse Bay RBL 1133 BD 2/3038/97 Apr 00

44 2007 CYS Associates (HK) Ltd Kellett School Proposed Extension 2 Wah Lok Path, Wah Fu, Pokfulam,Hong Kong I.L. 8542 BD 2/2004/05 OP: 23 July 2007 ; PC:

Anticipate by Mid Aug 07

45 2007 EC Projects Ltd Fibre Optic Factory 3 Dai Kwai Street, Tai Po IndustricalEstate

Tai Po Town Lot No. 1Section A, Sub-section 3&3A BD 2/9132/00 Mar 02

46 2007 Aedas Ltd Tsuen Wan Plaza - Renovation of T.W.T.L. 326, TsuenWan

Tsuen Wan Plaza, 4-30 Tai Pa Street,Tsuen Wan, N.T. T.W.T.L. 3262 BD 2-3/9113/87/9 Oct 06

47 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Phase VII, Development, The HK Poly U The Hong Kong Polytechnic University,Hung Hom, Kowloon K.I.L. 9853 R.P. & Extension BD 2/4004/02 Sep 05

48 2007 WCWP International Ltd School Improvement Programme, Package 1, Group 3 -St. Paul's Secondary School Ventris Road, Happy Valley, Hong Kong IL 8491 & Ext. BD 2/3032/02(P) 26 Sep 05

49 2007 Aedas Ltd Tai Yau Arcade Renovation 181 Johnston Road, Wanchai, Hong Kong I.L. 2808s.A, S.B & I.L.2809s. A, s.B BD 2-3/1133/80/3 24 Nov 06

50 2007 Integrated Design Associates Ltd Hong Kong Business Aviation Centre Hangar Two 12 South Perimeter Road, Chek Lap Kok Lot No 1 & The ExtensionThereto (L832) BD 2/9049/06(9) 12 Jul 07

51 2007 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed Private Residential Development at No. 1Barker Road No. 1 Barker Road, The Peak, Hong Kong R.B.L. No. 810 BD 2/2051/97 OP: 30 Sep 05

52 2007 Lu Tang Lai Architects Ltd The Morrison 28 Yat Sin Street

I.L. 3032 S.B., S.C.R.P. & I.L.1553 R.P. & I.L. 1553 S.A.,R.P. of Extension To I.L.1553 R.P. and S.A. ofExtension to I.L. 1553 R.P.

BD 2/3025/04 Aug 07

53 2007 Casa Design International Ltd 18-24 King's Road Hotel Development 18-24 King's Road, 7-9 Lau Sin Street and15 Tin Hau Temple Raod, North Point

I.L. No. 5379 R.P. andExtension BD 6/3006/97H Mar 05

54 2007 Ronald Lu & Partners (HK) Ltd Monte Vista Residential Development Area 108, Ma On Shan, Shatin, N.T. STTL 446 BD 2/9068/96 Mar 0055 2007 Wong & Ouyang (HK) Ltd 625 King's Road 625 King's Road, Hong Kong IL 7550 OP: 2 Apr 9856 2007 Planning Services International (Asia) Ltd Jockey Club Shek Mun Rowing Centre Area 51E, Shatin, N.T. STT 996 9055/00 Dec 0257 2007 LWK & Partners (HK) Ltd Private Residential Development of Composite Building Hau Man Street, Ho Man Tin KIL No. 11122 BD 3/4030/00 Aug 03

58 2007 Wong Tung & Partners Ltd Cyberport Residential Deve Bel-Air R1 Residence Bel-air, Island South, HongKong I.L. 8969 BD 2/2042/99/ST8

2004 (June 17) - Phase 1 ;2004 (December 10) -Phase 2

59 2007 Wong Tung & Partners Ltd Queen Street Redevelopment - (URA Project H1) Sheung Wan, Hong Kong - Site A I.L. 8897 BD 2019/95H 5 Feb 03

60 2007 Ronald Lu & Partners (HK) Ltd SIP Final Phase - Package Four S297 Lok Sin Tong KoHsiao Lin Secondary School Area 2A, Lung Hang Estate, Shatin

V.O. no 84 (Plan No.STM6154A) Land Status:School is Vesting on HousingAuthority Land

Practical Completion: 25Jan 06

61 2007 Wong & Ouyang (HK) Ltd Urban Renewal Authority Project K2 8 Argyle Street, Mongkok, Kowloon KIL 11099 BD 2-3/4231/93 6 Jul 04 (OP) ; 31 Oct 04(PC)

62 2007 Ronald Lu & Partners (HK) Ltd2008 Olympic Equestrian Venue at Hong Kong SportsInstitute, Shatin, N.T. - Main Stabling Complex &Veterinary Stables

25 Yuen Wo Road, Shatin, N.T. GLA ST-301 & STTL 13 Jul 07

63 2007 D. Heung & Associates Architects & Engineers Ltd Mount Davis 33 33 Ka Wai Man Road, Kennedy Town,Hong Kong I.L. 8873 BD 2/2038/97H(P) May 06

64 2007 Wong Tung & Partners Ltd Proposed Residential Redevelopment at 43-45, BeaconHill Road 43-45 Beacon Hill Road NKIL 4763 BD 2/4024/04 15 Sep 07

65 2007 Chau Ku & Leung Architects & Engineers Ltd 707-R-HK 57 Plantation Road R.B.L. 151 2098/94 19 Jul 01

66 2007 Chung Wah Nan Architects Ltd Proposed Composite Development J/O Tuen Mun Road & Yuk Hong Street T.M.T.L. 416 Area 10A, TuenMun, N.T. BD 2/9345/97 16 Jun 00

67 2007 Wong Tung & Partners Ltd Mega Box (Phase II) 28 Wang Chiu Road, Kowloon Bay, N.K.I.L 5927 BD 2-3/4042/02 27 Apr 07 (Phase II O.P.)68 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park Kowloon Inland Lot No. BD 2/4038/00 Feb 04

69 2007 MLA Architects (HK) Ltd Development At TWTL 395, Area 40 Route Twisk,Tsuen Wan, N.T.

TWTL 395, Area 40, Route Twisk, TsuenWan TWTL 395 2/9006/01 18 Oct 04

70 2007 Planning Services International (Asia) Ltd Outdoor Training of Outward Bound School Outward Bound School Ah Kung Wan, TaiMong Tsai, Sai Kung STT No. SX627 at D.D. 252 BD 2/9018/02(1) (P) 30 Aug 05

71 2007 Ronald Lu & Partners (HK) Ltd No. 1 Ho Man Tin Hill Road No. 1 Ho Man Tin Hill Road, Kowloon K.I.L. 2411 4008/93 5 Nov 02 ; 25 Mar 03

72 2007 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RIVB) Bel-Air on the Peak (Area RIVB), Stages10-12, Cyberport, Hong Kong IL 8969 s.B BD 1/2042/99/ST10-

12(B) 29 May 07

73 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd St. Philips Church Tin Shui Wai 16 2/9257/97 2000

74 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development at Sham Tseng - OceanPointe

No. 8 Sham Tsz Street, Sham Tseng,Tsuen Wan, N.T. Lot 265 in DD390 BD 9184/96 Dec 00

75 2007 A & T Design Ltd The Apex (Phase 1) 29-51 Wo Yip Hop Road, Kwai Chung 467 BD 2/9026/01 (Pt: IV) (Phase 1) 10 Jul 07 ; Nov

76 2007 Aedas Ltd Main Contract Work's For Caroline Centre, 2-38 YunPing Road, Causeway Bay

Caroline Centre, 2-38 Yun Ping Road &61-67 Jardine's Crescent, Causeway Bay

I.L. 29s.G, I.L. 457s.A, s.F,s.H, s.O, s.CR.P.S.DR.P,S.E.R.P, S.GR.P., I.L.461s.CSS.1, s.CSS.2,

2-3/3062/88 23 Oct 03

77 2007 Aedas Ltd Kowloon Hotel Renovation Works 19-21 Nathan Road, TST, Kowloon K.I.L. 10737 BD 2-3/4030/82 Phase 1: 26 Jun 06 ;Phase 2: 31 Aug 06

78 2007 Andrew Lee King Fun & Associates Architects Ltd 633 King's Road, North Point 633 King's Road, North Point I.L. 7860 BD 2/3004/04 30 May 07

79 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center 750 Nathan Road, Kowloon K.I.L. 2111 BD 2-3/4157/89/9, 11,13 Apr 05

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

80 2007 Aedas Ltd Addition and Alteration Works at Hau Tak ShoppingCentre (Phase 3)

East Wing & West Wing, Hau TakShopping Centre, Hau Tak Estate,Tseung Kwan O, New Territories

TKOTL No. 99 HD(ICU)E 3/026(N)AA(5)-D Anticipated, Nov 07

81 2007 Aedas Ltd Kerry Cargo Centre & Public Vehicle Park 55 Wing Hei Road KCTL 455 Kwai Chung, N.T. BD 2/9155/96 May 9982 2007 MLA Architects (HK) Ltd Proposed Hotel on I.L. 4852, I.L. 4853 & I.L. 4854 202, 204 & 206 Queen's Road Central I.L.s 4852, 4853, 4854 BD 2/2017/03 27 Sep 0683 2007 Aedas Ltd Good Shepherd Street, Homantin, Kowloon Good Shepherd Street, Homantin, K.I.L. 11091 BD 4040/97 Aug 0084 2007 Wong Tung & Partners Ltd Aegean Coast So Kwan Wat, Tuen Mun Tuen Mun Town Lot No. 374 BD 2/9025/97H Sep 0285 2007 P & T Architects & Engineers Ltd St. Mary's Canossian School - Proposed Extention 162 Austin Road, Kowloon KIL 9550 BD 4054 Aug 0386 2007 Wong & Ouyang (HK) Ltd Villa Esplanada, Phase 2 Nga Ying Chau Street, Tsing Yi, N.T. TYTL 129 BD 2/9123, 95H (Pt. Mar 99 ; Jul 9987 2007 P & T Architects & Engineers Ltd VTC - Chai Wan Teaching Block Extension Shing Tai Road, Chai Wan, Hong Kong CWIL 151 2/3089/02 (P) 13 Sep 0488 2007 P & T Architects & Engineers Ltd Residential Redevelopment of Branksome Tower II 3A Tregunter Path, Hong Kong IL 8393 BD 2-3/2288/71/2 Apr 04

89 2007 P & T Architects & Engineers Ltd Residential Development At 10, 12, 16 & 18 Pollock'sPath, Hong Kong

10, 12, 16 & 18 Pollock's Path, HongKong

R.B.L. 513 R.P & R.B.L. 540SEC BD /2030/02 OP: 28 May 07 ; PC: 30

Jul 0790 2007 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development at Ma Tau Kok 383 To Kwa Wan Road K.M.L. 102 R.P. BD 2/4006/02 Nov 0691 2007 KLS International Architects & Planners Company Limited Proposed Office Building 111 King Lam Street, Kowloon NKIL 4761 BD 2/4141/92 Feb 0792 2007 Leung King Partners Ltd Residential Redevelopment at 377 Prince Edward Road 377 Prince Edward Road, Kowloon K.I.L. 4234 S.A. 4003/99 11 Mar 04 / 30 Jun 0493 2007 Aedas Ltd DHL Central Asia Hub Expansion 6 South Perimeter Road, Chek Lap Kok Lot No. 1 & Extension thereto BD 2/9151/05 Aug 07

94 2007 Leigh & Orange Ltd Redevelopment of Lam Tin Estate Phase 6 On Tin Estate, On Tin Street, Lam Tin KL29NR HD(ICU)B02/KL29NR/06 Dec 04

95 2007 Lu Tang Lai Architects Ltd Proposed Residential Development at Area 36, SheungShui, NT (Royal Green) (Phase 1 only)

Area 36 Sheung Shui, NT, 18 Ching HiuRoad FSSIL 189, NT BD 2/9138/97H Apr 05

96 2007 P & T Architects & Engineers Ltd Enterprise Square III 39 Wang Chiu Road, Kowloon Bay, N.K.I.L 5877 13 May 0497 2007 Ronald Lu & Partners (HK) Ltd Imperial Villa Phase 1 Ping Chuk Lane, Ping Shan, N.T. 2052 in D.D. 121 2/9111/01 28 Oct 03

98 2007 Chau Ku & Leung Architects & Engineers Ltd Proposed Residential Development 464-474 Castle Peak Road, Cheung ShaWan, Kowloon

N.K.I.Ls. 1177 s.AR.P & R.P.& s.As.s. 1 & 1176 s.A.R.P. &s.A.s.s. 1 & 1175 s.B & R.P.

BD 3/4031/04 Anticipated in Aug 07

99 2007 Wong & Ouyang (HK) Ltd Sheung Shui Slaughterhouse 15 Chuk Wan Street, Sheung Shui Area 2B, Sheung Shui, N.T. Not Applicable Jul 99 OP/PC100 2007 DesignVision Architects Ltd Shatin Assembly of God Church 10-12 Man Lai Road, Tai Wai, Shatin D.D. 179 Lot 773 BD 2/9178/94 6 Mar 99 (OP) ; Aug 98101 2007 Wong & Ouyang (HK) Ltd Gateway II Canton Road K.M.L. 11s.B & s.D BD 2/4040/92 29 Oct 99102 2007 DCM Studios Ltd Tai Yip Building 141 Thomson Road, Wanchai, Hong Kong IL 2802 BD 2-3/3016/98 May 02103 2007 Aedas Ltd 11 Chater Road (Chater House) 11 Chater Road ML 287, 288 BD 2/2014/96 20 Jun 02104 2007 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Nam Long Shan Road, Aberdeen Lot AIL 417 Sep 02

105 2007 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed Residential Development at Yau Tong,Kowloon 8 Shung Shun Street, Yau Tong, Kowloon YTIL 21 BD 2/4022/00 30 Aug 06

106 2007 AGC Design Ltd Tung Chung Station Development Package One Tung Chung Town Lot 2 TCTL 2 BD 4/7302/94(P) Pt. II 21 Nov 05107 2007 Design Consultants Limited West Island School Annex 250 Victoria Road, Hong Kong I.L. 8839 BD 2/2036/01 (P) OP: 31 Aug 03108 2007 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Pok Oi Hospital, Au Tan, Yuen Long, N.T. Lot No. 1630 in DD115 BD 2/9164/00 Apr 06109 2007 Robert Wee Architects Ltd Proposed Commercial Building 116-120 Castle Peak Road D.D. 120 Lots 3647, 3651, BD 2-3/9095/02 Apr 06

110 2007 Aedas Ltd Tung Chung Cable Car - Ngong Ping Terminal Ngong Ping Road, Lantau N/A BD 2/9905/03 (NPT)(P) 17 May 06

111 2007 Aedas LtdAlteration and Addition to Hong Kong InternationalAirport Passenger Terminal Building - East HallExtension

Hong Kong International AirportPassenger Terminal Building - East HallExtension, Chek Lap Kok

No. 1 & extension thereof BD 2/9810/01(P) BD104 issued on01/08/2003

112 2007 Aedas Ltd ASD Reprovision Stanley Market & Public Toilet &Football Beach Stanley Main Street, Stanley / / (ASD Project) OP: Exempted ; PC: 04/99

113 2007 Aedas Ltd Alteration and Addition Works to Existing Giant PandaHabitat

Ocean Park, Wong Chuk Hang Road,Hong Kong

RBL 1020 R.P. & Ext.Thereto BD 2/3014/98(P) BA 14 (Jun 07)

114 2007 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road West KIL 2097 s.E.R.P. Aug 01115 2007 Ma & Fong & Associates Ltd Commercial / Office Bldg at 674-682 Nathan Road 674-682 Nathan Road, Kowloon TBA TBA July 1997 ; May 1997

116 2007 A & T Design Ltd Proposed Hotel Development at KIL 11103 Hung HomBay, Kowloon

KIL 11103, Hung Hom Bay (12 Hung LokRoad) KIL 11103, KLN BD 2/4049/01 22 Dec 05 ; 1 May 06

117 2007 KLS International Architects & Planners Company Limited Proposed Alteration & Addition Works of a residentialdevelopment 8 Tai Tam Road R.B.K. 845 BD 2-3/3015/95 Dec 04

118 2007 Andrew Lee King Fun & Associates Architects Ltd Proposed Development at Reclamation Street andArran Street

589-601 Reclamation Street, Mongkok,Kowloon

Kowloon Inland Lot No.11173 2/4020/04 Aug 07

119 2007 WCWP International Ltd Proposed Kwong On Bank HeadquartersRedevelopment

137-141 Queen's Road & 1-13 GilmansBazzar, Central, Hong Kong 4810-4819 2060/95 22 Jul 99

120 2007 LWK & Partners (HK) Ltd Res Dev at Sham Mong Road 8 Sham Mong Road, Kowloon NKIL 6338 BD 2/4033/00 15 Dec 03

121 2007 Wong Tung & Partners Ltd Cyberport Residential Development - R2 Bel-Air Rise, Resident Bel-Air, IslandSouth, Hong Kong IL8969 BD 2/2042/99/ST9

(OP) 29 June 05 / (PC) 29Jun 05 - Section 1 ; (PC)30 Sep 05 Section 2

122 2007 Urbanage International Ltd TWGHs S.C. GAW Memorial College Tsing Sum Street, Town Centre, Tsing Yi GLA-TW/82 2/3020/03(P) Jul 05123 2007 LWK & Partners (HK) Ltd Residential Development at 56 Peak Road, Hong Kong 56 Peak Road, Hong Kong Lot 718 BD 2/2014/00 Apr 03

124 2007 Hsin Yieh Architects & Engineers Ltd Proposed Residential Development at 23 Tai HangDrive, I.L. 8972 23 Tai Hang Drive, I.L. 8972, Hong Kong I.L. 8972 BD 2/3034/00 OP: Nov 06 ; PC: Mid 07

125 2007 Wong Tung & Partners Ltd Les Saisons I.L. 843 (Shau Kei Wan) 2/3042/98 31 Oct 01126 2007 Wong Tung & Partners Ltd Cyberport Development Telegraph Bay, Pok Fu Lam I.L. 8969 BD 2/2042/99/ST4 Dec 02127 2007 Wong Tung & Partners Ltd Proposed Service Apartment Development 1 Tsing Yi Road Tsing Yi Town Lot No. 140 BD 2/9165/98 Mar 04

128 2007 Percy Thomas Partnership (HK) Ltd Private Independent School at Norfolk Road Junction of Norfolk Road and To FukRoad, Kowloon Tong NKIL 6244 2/4047/03(P) Oct 06

129 2007 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road, Central M.L. 14 BD 1/2065/94 OP: Nov 99 ; CP: Dec 99

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

130 2007 Rocco Design Architects Ltd Proposed Commercial Development at 323-337Lockhart Road and 304-312 Jaffe Road, Hong Kong

323-327 Lockhart Road and 304-312 JaffeRoad, Hong Kong ML 439 & 440 BD 2/3098/93 OP: 15 May 00 ; PC: 9

Aug 00131 2007 Leigh & Orange Ltd Hong Kong Science Park Ph. 2, Area A1, Building 10 & TPTL 182 BD 2/9083/03 Mar 2007132 2007 P & T Architects & Engineers Ltd Siu Sai Wan Shopping Centre Improvement Works Siu Sai Wan Estate, Siu Sai Wan, Hong Apr 02

133 2007 Wong & Ouyang (HK) Ltd Community Centre 1 Greig Road, Quarry Bay, Hong Kong I.L. 8397 s.J. BD 2/3043/02 OP on 3 Jun 04 ; PC on31 May 04

134 2007 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd Residential Redevelopment 7 Sing Woo Crescent, Happy Valley I.L. 6395 2/3037/98 Mar 01

135 2007 Wong & Ouyang (HK) Ltd Redevelopment of Golden Theatre 94 Yen Chow Street, Kowloon NKILs. 2770 R.P. & Ext. 2785s.B & Ext. BLD(B) 2/4099/91 Dec 93

136 2007 JADL Design Ltd Proposed Residential Development 78 Mount Kellett Road 548 BD 2/2008/04 21 Aug 06

137 2007 LWK & Partners (HK) Ltd Residential Development at S.I.L. 845 Yiu Hing Road,Shaukeiwan, Hong Kong

S.I.L. 845 Yiu Hing Road, Shaukeiwan,Hong Kong I.L. 845 BD 2/3010/00 OP: Feb 03

138 2007 AGC Design Ltd Proposed Reconstruction of President Theatre 501-517 Jaffe Road, Causeway Bay,Hong Kong

S.S.1 & R.P. of S.D. I.L. 2836& S.S.1 & R.P. of S.L. of M.L.52 & Ext. Thereto

BD 2/3034/99 OP: 14 Mar 03

139 2007 Wong Tung & Partners Ltd Queen Street Redevelopment - (URA Project H1) - Site Queen Street, Sheung Wan, Hong Kong 2/2019/95 16 Aug 02

140 2007 Design 2 (HK) Ltd CLP Power Substation at On Sum Street On Sum Street, Shatin, N.T. STTL NO. 545 BD/2-4/9026/04(P) OP: 29 May 06 ; PC: 27Mar 06

141 2007 Ronald Lu & Partners (HK) Ltd School Improvement Program - Final Phase (Package4)

Pok Oi Hospital Chan Kai MemorialCollege, Lung Hang Estate, Shatin, N.T.

ASD 303/92301/CAAK04

23 Sep 05 ; 22 Sep 05(Main Section) ; 3 Sep 04(Section A) ; 11 Jan 06

142 2007 Ronald Lu & Partners (HK) Ltd Residential & Retails Development at 18 Farm Road 18 Farm Road, Ma Tau Wai, Kowloon,Hong Kong KIL 11145 2/4060/00 Jul 04

143 2007 Woods Bagot Asia Ltd Alteration & Additional Works to TST Centre 66 Mody Road, Tsim Sha Tsui East, KIL 10477 2-3/4198/77/12 May 06144 2007 Thomas Chow Architects Ltd SIP - Final Phase (S270) of DBS Campus 131 Argyle Street BD 2/3019/03 (P) Jun 05

145 2007 Andrew Lee King Fun & Associates Architects Ltd Residential Development, 250 Shau Kei Wan Road,Hong Kong 250 Shau Kei Wan Road, Hong Kong Shau Kei Wan Lot 4 31 Dec 03

146 2007 Aedas Ltd Alterations & Additions to 24/F, 25/F, 26/F And Roof ofPrince's Building

Prince's Building, 10 Chater Road,Central, Hong Kong IL 2181 BD 2-3/2567/61/49 Sep 07

147 2007 P & T Architects & Engineers Ltd Residential Redevelopment at RBL 809 23 Big Wave Bay Road, Shek O, Hong RBL 809 Nil 10 Dec 03 (OP)148 2007 Andrew Lee King Fun & Associates Architects Ltd Proposed New Residential Building 18-30 Bedford Road, Tai Kok Tsui KIL 11157 BD 1/4063/00 Sep 07 (Expected)149 2007 LWK & Partners (HK) Ltd Extension of Ancestral Worship Halls at Po Fook Shan Po Fook Shan, Sha Tin Town Lot No. 311 STTL 311 BD 2/9110/00 11 Sep 06150 2007 Sherman Kung & Associates Architects Ltd Extension to HKEAA San Po Kong Sub-Office 17 Tseuk Luk Street, San Po Kong NKIL 5774 ASD PB SW Mar 02

151 2007 Wong Tung & Partners Ltd The Hong Kong Polytechnic University Phase VIDevelopment

The Hong Kong Polytechnic University,Hung Hom, Hong Kong KIL 9853 R.P. and Extension BD 4014/97(P) OP 09/00 ; PC(1) - 10/00 ;

PC(2) 08/01152 2007 Hong Kong Housing Authority HOS Development At Shatin Area 14B, Phase 4 Yuen Chau Kok, Shatin STTL 462 Jul 01

153 2007 RDL Asia Ltd Proposed Service Apartment 24-26 Kimberley Road, 55-61 CarnarvonRoad and 38-40 Kimberley Street, TST KIL 11147 BD 4/4064/96 OP: 28 Oct 04

154 2007 RDL Asia Ltd Tian Jin Building Hotel Redevelopment 167 Connaught Road West, Hong Kong ML 344 R.P & 364 R.P. H.K. 2/2033/97H Aug 07155 2007 LWK & Partners (HK) Ltd 117 Repulse Bay Road 117 Repulse Bay Road RBL 168 S.A. S.S.I. BD 2/3092/97 Nov 03

156 2007 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East

IL47AsARP, IL47AsBRP,IL47AsCRP, IL47ARP,IL47BsCRP, IL47BRP,IL47AsBss2, IL47AsD,IL47BsD, IL47BsBRP,IL47BsARP, IL47CsARP,IL47CsAss1RP, IL47CRP,IL47DRP, IL47DsARP,IL47sBRP, IL47sAss1,IL47sCss1 & ExtensionThereto, IL47sCss2sA,IL47sCss2RP, IL47sCss3sA,IL47sCss3RP, IL47sCss4,IL47sCss5 & ExtensionThereto, IL47sCss6sRP,IL47sCss6sA, IL47sCss7RP,IL47sCRP, IL47sBss1,IL47sARP, IL47sP, IL47RP,IL47sP, IL47RP

BD 3019/01 Feb 07

157 2007 Aedas Ltd Skyplaza Development (South Office Tower) Hong Kong International Airport, Chek LapKok

CLK Lot No. 1 R.P. and TheExt. Thereto

BD 2/9062/03 (5) (P) ;FP 43/0004/99 (E) 23 May 07

158 2007 Wong Tung & Partners Ltd Olympic Station Development, Phase II KIL 11090, Tai Kok Tsui, Kowloon KIL 11090 Feb 01

159 2007 WCWP International Ltd School Improvement Programme - Final Phase St.Clare's Girls' School 50 Mount Davis Road, Hong Kong IL 7388 2/3097/01 Feb 05

160 2007 WDA Architects Ltd Caritas Wu Cheng Chung Sec. School 2 Northcote Close, Pokfulam, Hong Kong Southern GLA-HK 907 N/A Jul 06

161 2008 Spence Robinson Ltd Addition & Alteration Works at 5-7 Austin Road, TsimSha Tsui Nos 5-7 Austin Road, Kowloon 8668 R.P. & 8113 BD 2-3/4113/73 April 2008

162 2008 AGC Design Ltd Proposed Hotel Development at 31E - 39 WyndhamStreet, Central 31E, 31F, 33-39 Wyndham Street, Central

I.L. 7076, I.L. 7077, I.L. 971,I.L. 970S.A.R.P., I.L.970R.P., I.L.

BD 3/2058/94 Pt. IV. July 2004

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

163 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd "The Grandiose" Residential and CommercialDevelopment at Area 55b, Tseung Kwan O

Area 55b, Tseung Kwan O, Sai Kung,N.T. TKOTL Lot No. 75 BD 3/7227/02 January 2006

164 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Job No. NMW 1598, Proposed Open Niches at CapeCollinson Chinese Permanent Cemetery, Chai Wan Cape Collinson Road, Chai Wan IL 7715 BD 3003/06(P) 26 October 2007 (OP) /

October 2007 (PC)165 2008 Andrew Lee King Fun & Associates Architects Ltd Residential Development at 220-222 Tai Kok Tsui Road 220-222 Tai Kok Tsui Road KIL 11159 30 September 2008

166 2008 Lu Tang Lai Architects Ltd Yuen Long Area 13, Two Primary Schools Area 13, Yuen Long, New Territories Area 13ASD55/92050/CWO/011-06/BP

August 2008

167 2008 LWK & Partners (HK) Ltd Residential Development at 116 Pokfulam Road 116 Pokfulam Road, Hong Kong RBL 174 BD 2007/86 August 2001

168 2008 Aedas Ltd Skycity Marriott Hotel - Phase 1 1 Sky City Road East The RP. Of Chek Lap KokNo. 1 & The Extension BD 9094/06 September 2008 /

November 2008

169 2008 LWK & Partners (HK) Ltd Proposed Domestic Building at No. 244 Aberdeen MainRoad, Hong Kong No. 244 Aberdeen Main Road, Hong Kong A.I.L. 287 & Ext. BD 2052/96 October 2000

170 2008 Ronald Lu & Partners (HK) Ltd SIP Final Phase (Package 4) - Chinese YMCA College Area 86 Heng On Estate, Ma On Shan,New Territories --

ASD053/6487/ALL318/C25/001

Section 3A - SectionalCompletion: 19 August2004 / Section 3 (Annex) -Completion: 25 November2004

171 2008 Hsin Yieh Architects & Engineers Ltd International Christian Quality Music Secondary &Primary School

Po Kong Village Road, Diamond Hill,Kowloon NKIL 6358 BD 4040/01 27 August 2004 / End

August 2004

172 2008 Wong Tung & Partners Ltd Development at Kowloon Bay, Enterprise Square 5Phase 1 (Mega Box) 38 Wang Chiu Road, Kowloon Bay NKIL 5927 BD2 /4042/02 29 Dec 2006 / 15 Jan

2007

173 2008 CYS Associates (HK) Ltd Golf Park View 83 Castle Peak Road, Kwu Tung, NewTerritories 2574 in D.D. 92 BD 9183/00 June 2004

174 2008 Perry Thomas Partnership (HK) Ltd Provision of Additional Lifts at Block S of UnitedChristian Hospital

J/O 130 Hip Wo Street & Sau Mau PingStreet NKIL 6014 BD 2/4009/04(P) 19 July 2007 / 31 July

2007

175 2008 Chung Wah Nan Architects Ltd SKH Wei Lun Primary School, SIP-Final Phase Self-delivery Mode

Area 13, Discovery Bay, Lantau Island,New Territories

Area 13, Discovery Bay,Lantau Island, N.T., On theremaining Portion of Lot No.385 in D.D. 352

BD 3057/02(P) 17 March 2005

176 2008 Alliance Architects Ltd Redevelopment of Tsing Yi Logistic Centre -- Tsing Yi STTL No. 3622 BD 2/9139/07 November 2008

177 2008 Wong & Ouyang (HK) Ltd Langham Place Hotel 555 Shanghai Street, Mongkok, Kowloon KIL 11099 (K2-Site B) BD 2/4231/93 17 February 2004 (OP) /28 February 2005 (PC)

178 2008 Architecture Design & Research Group Ltd The Hong Kong Community College (Hung Hom BayCampus)

8 Hung Lok Road, Hung Hom Bay,Kowloon KIL 11163 BD 4026/04 10 July 2007

179 2008 Integrated Design Associates Ltd Hong Kong Business Aviation Centre Hangar Two 12 South Perimeter Road, Chek Lap Kok,NT

The RP of Chek Lap Kok, LotNo. 1 & the ExtensionThereto (L104)

BD 2/9049/06(P) July 2007

180 2008 Thomas Chow Architects Ltd Sports & Dormitory Complex at the Diocesan Boy's 131 Argyle Street, Kowloon KIL 6737 BD 2/4050 19 December 2007

181 2008 Wong & Ouyang (HK) Ltd Tower 20 Phase 3 of the Kowloon Station DevelopmentSite F

LAR Kowloon Station Development-Site F(Tower 20) KIL 11080 BD 2/7219/00(F) Pt.

VIII 28 June 2007 (OP)

182 2008 LWK & Partners (HK) Ltd Proposed Redevelopment at J/O Fu Hing Street & SanHong Street, Sheung Shui, NT

Fu Hing Street & San Hong Street,Sheung Shui, NT DD91 Lot 3597s RP BD 2/9215/95 08 September 2003

183 2008 WMKY Ltd Proposed Residential Building 120 Pokfulam Road, Hong Kong RBL 422 & Ext BD 2/2045/94 30 February 2007 (OP) /30 October 2007 (PC)

184 2008 Leigh & Orange Ltd School Improvement Programme - Phase IV, Package 288-290 Tai Po Road, Kowloon NKIL 4456 BD 3004/02(P) 26 July 2004

185 2008 Ronald Lu & Partners (HK) Ltd The Giverney Man Kei To, Pak Sha Wan, Sai Kung, NT Lot No. 1184 in DD217 BD 9121/01 23 April 2005 (OP) / 24May 2005 (PC)

186 2008 Aedas Ltd Proposed HKIEd Jockey Club Primary School 10 Lo Ping Road, The Hong Kong Instituteof Education, Tai Po, New Territories TPTL 147 August 2002

187 2008 Wong & Ouyang (HK) Ltd Lincoln House Taikoo Place, 979 King's Road, QuarryBay

QBML 1RP, sQ, sR, ss1,sRRP, sS, sTss1, sTss2,sTRP, sU & sW

BD 2/3017/94 September 1998

188 2008 CYS Associates (HK) Ltd Tung Chung Station Development Package 2, Phase 4 TCTL 4 BD 7337/96(LR) 24 Dec 07 (Phase 1) / 29Jan 08 (Phase 2)

189 2008 Design 2 (HK) Ltd Mid-field Screening Facilities AAHK, 1 Chong Yip Road, HKIA Chek Lap Kok Lot No. 1 andextension thereto BD 2/9815/02 11 April 2003 (OP) / 31

March 2003 (PC)190 2008 Chung Wah Nan Architects Ltd Senior Staff Centre 23 Nam Shan Chuen Road NKIL 5953 BD 2/4028/94(P) 20 December 1995

191 2008 Andrew Lee King Fun & Associates Architects Ltd Proposed Hotel Development (Newton Place Hotel) 163 Wai Yip Street, Kwun TongSec A KTIL No. 752, Sec BKTIL No. 752 & RP KTIL No.752

BD 2/4074/94 January 2007

192 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development at Ma Tau Kok 383 To Kwa Wan Road KML 102 RP BD 2/4006/02 November 2006

193 2008 Ronald Lu & Partners (HK) Ltd SIP (Final Phase Self Delivery Mode) Po Leung KukLee Shing Pik College

12-20 On Yin Street, Chai Wan Kwok,Tsuen Wan, NT TWTL 283 BD 3024/02(P) 26 April 2005 (OP) / 03

September 2005 (PC)194 2008 Spence Robinson LT Ltd Hotel Development at 46-48 Anchor Street 46-48 Anchor Street, Tai Kok Tsui, KIL 6374 BD 4/4028/01 March 2005

195 2008 CYS Associates (HK) Ltd Residential Development at S.A. of I.L. 1680 No. 118-122 Tung Lo Wan Road, Hong Kong

118-122 Tung Lo Wan Road, CausewayBay, Hong Kong SA of IL1680 BD 3008/05 May 2008

196 2008 Architecture Design & Research Group Ltd Hong Kong Community College Development at WestKowloon 9 Hoi Ting Road, West Kowloon KIL 11176 BD 2/4050/05 28 March 2008

197 2008 P & T Architects & Engineers Ltd Redevelopment of Craigengower Cricket Club (Phase1) 188 Wong Nai Chung Road, Happy Valley IL 8881 BD 2/3070/01 (Ph.1) 14 October 2003 (OP) / 4

December 2003 (PC)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

198 2008 Wong Tung & Partners Ltd Teaching Hotel, The Chinese University of HK The Chinese University of Hong Kong STTL 437 & Ext thereto BD 2/9003/02 12 June 2008 (OP) /August 2008 (PC)

199 2008 Hong Kong Housing Authority Choi Wan Road Site 1 Phase Choi Wan Road, Kowloon Bay GLA-NK-730 KE05 NR-05 (HD) June 2008200 2008 Ronald Lu & Partners (HK) Ltd Tai Kok Tsui Municipal Services Complex 63 Fu Tsuen Street, Tai Kok Tsui, June 2005

201 2008 Wong & Ouyang (HK) Ltd One Island East 18 Westlands Road, Quarry Bay

QBIL 15 s.D, QBML 1s.Css.5, s.Css6, QBML 2s.G& Ext, s.F & Ext,s.Hss.6s.BRP & Ext s.HRP &Ext and QBML 2 RP & Ext.

BD 2/3031/01 17 March 2008

202 2008 WCWP International Ltd SIP Final Phase Package 1, St. Paul's Convent School 140 Leighton Road, Causeway Bay IL 1018 BD 2/3083/01 (P) 25 June 2005203 2008 Andrew Lee King Fun & Associates Architects Ltd Composite Building at 3 Kwong Wa Street, Kowloon 3 Kwong Wa Street, Kowloon SKIL 1157 BD 2/4020/99H (Pt. 26 June 2003204 2008 Ronald Lu & Partners (HK) Ltd Quarantine 'B' Stables Sha Tin Racecourse, New Territories STTL 13 BD 9189/05(2)(P) 22 April 2008

205 2008 Aedas Ltd A&A Works at Nexxus Building, 41 Connaught RoadCentral M.L. 382 41 Connaught Road Central, Hong Kong ML 382 BD 2-3/2333/59/3 November 2008

206 2008 Aedas Ltd Renovation of Tsuen Wan Plaza (Phase 2) 4-30 Tai Pa Street, Tsuen Wan, NewTerritories TWTL 326 October 2008

207 2008 Simon Kwan Architect & Associates Ltd Proposed Community Hall & Integrated Services Centre Discovery Bay North RP of Lot 385 in DD 352 &Ext BD 2/9166/99 27 April 2007 (OP) / July

2007 (PC)

208 2008 Ronald Lu & Partners (HK) Ltd Residential Development in Lot 1739 in DD122 CastlePeak Road, Yuen Long, New Territories

131 Castle Peak Road, Ping Shan, YuenLong, New Territories 1739 in DD122 BD 9075/01 23 December 2005

209 2008 Design Consultants Limited HKU Space Community College 28 Wang Hoi Road, Kowloon Bay NKIL 6429 BD 4018/04 September 2006

210 2008 Andrew Lee King Fun & Associates Architects Ltd Southern Lodge, Residential Development 358-364 Un Chau Street, Sham Shui Po,Kowloon NKIL 2866 s.F & RP BD 4005/04 6 March 2008

211 2008 Spence Robinson Ltd Proposed Golf Club Development Chuen Lung, Tsuen Wan TWTL 389 BD 2/9139/05 September 2008

212 2008 Spence Robinson LT Ltd Residential Development at Chuk Kok, Sai Kung (TheCove) Chuk Kok, Sai Kung Lot No. 14 in DD 231 BD 6/9007/01 April 2005 (OP) / March

2005 (PC)

213 2008 Rocco Design Architects Ltd Office Building at Tsing Yi Town Lot 139 99 Cheung Fai Road, Tsing Yi TYTL 139 BD 7362/02 3 November 2004 (OP) /15 February 2005 (PC)

214 2008 Architecture Design & Research Group Ltd New Annex Block To Wah Yan College (Kowloon) 56 Waterloo Road, Kowloon KIL 6059 BD/3012/02(P) 24 January 2005

215 2008 Simon Kwan Architect & Associates Ltd URA H9, Wan Chai Road / Tai Yuen StreetRedevelopment (Site B)

Wanchai Road / Tai Yuen Street,Wanchai, Hong Kong IL 8953 BD 2/3035/99 16 June 2005

216 2008 Steve Leung Architects Proposed Office Building at 9 Chong Yip Street 9 Chong Yip Street, Kwun Tong, Kowloon KTIL 444 March 2004

217 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Development at URA K11 - Hanoi Road Site(KIL 11188), Kowloon K11 Hanoi Road, Tsim Sha Tsui, Kowloon KIL 11188 BD 3/4031/00 Before November 2008

218 2008 Steve Leung Architects Win Plaza 9 Sheung Hei Street, San Po Kong, NKIL 6237 SA, SB & BP BD 2/4083 March 2008 (OP)

219 2008 Aedas Ltd Proposed Alterations and Additions Works at theRuttonjee Centre 11 Duddell Street, Central, Hong Kong IL669 & IL30sCRP & sA &

IL644sA BD 2-3/1192/79/3 13 January 2006

220 2008 Architectural Services Department (Lau Fau Shan) Tin Shui Wai Fire Station cumAmbulance Depot in Area 112, Tin Shui Wai 101 Tin Shui Road, Tin Shui Wai GLA-TSW-63 5570D 24 January 2003

221 2008 Simon Kwan Architect & Associates Ltd Proposed Centre For Chinese Archaeology And Art,The Chinese University of Hong Kong Sha Tin STTL 437 RP & the Ext thereto STTL 437 BD 2/9073/01 September 2007

(NT57/2007 (OP))

222 2008 MLA Architects (HK) Ltd Residential Development at Lot No. 4783 in DD104,Ngan Tam Mei Road, Yuen Long

Lot No. 4783 in DD 104, Ngan Tam MeiRoad Lot No. 4783 BD 2/9034/05 31 March 2008

223 2008 P & T Architects & Engineers Ltd VTC - Chai Wan Teaching Block Extension Shing Tai Road, Chai Wan, Hong Kong CWIL 151 BD 2/3089/02(P) 13 September 2004224 2008 MLA Architects (HK) Ltd Residential Development at Kwun Lung Lau 20 Lung Wah Street, Kennedy Town IL 8041 BD 6/2010/99H(P) December 2007

225 2008 Benoy Ltd A&A Works at Hong Kong International Airport Terminal1 Chek Lap Kok Lot No. 1 RP & the thereto

P381 - Completion on May08 / P382 - Completion onNov 08 / P386 -Completion on Jul 08 /P387 - Completion on Nov

226 2008 Simon Kwan Architect & Associates Ltd Residential Development at 50A, B & C, Tai HangRoad, Hong Kong 50A, B & C, Tai Hang Road, Hong Kong IL 8973 BD 3010/99 28 June 2005

227 2008 A & T Design Ltd Proposed Development at No. 880-886 King's Road 880-886 King's Road QBIL 4sBss.1SA & ss.1RP,QBIL 4sbss. 2 & SBRP BD 2/3013/04 13 August 2007

228 2008 DCM Studios Ltd Tai Yip Building 141 Thomson Road, Wanchai IL 2802 BD 2-3/3016/98 May 2002

229 2008 Leigh & Orange Ltd Area C, Hong Kong Science Park Phase 2 Hong Kong Science Park Phase 2, PakShek Kok, Tai Po, New Territories TPTL 182 BD 2/9083/03(2) (Pt

III) June 2007

230 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Alteration and Addition Works to Cinemas Level 1-2A, Festival Walk, 80 Tat CheeAvenue, Kowloon Tong, Kowloon NKIL 6181 BD 2-3/4055/93/15 December 2006

231 2008 Wong Tung & Partners Ltd Cyberport at Telegraph Bay (C3A Office) 100 Cyberport Road, Pok Fu Lam IL 8969 BD 2/2042/99/ST6 May 2004232 2008 A. Lead Architects Ltd Church, Kindergarten & Elderly Home Cornwall Street, Kowloon NKIL 6182 BD 2/4007/02 September 2008

233 2008 H.C. Wu Architect & Associates Tong Yan Sun Tsuen Phase 1 and 2 Ma Fung Ling Road, Tong Yan SunTsuen, Yuen Long, New Territories DD 122 Lot 1740 BD 2/9129/02 Phase 1: December 2007 /

Phase 2: June 2007

234 2008 A. Lead Architects Ltd Main Block Extension, Hong Kong Baptist Hospital 222 Waterloo Road, Kowloon NKIL 5906 BD 2-3/4078/76(I)/8 22 Feb 2008 (OP) / 2 Feb08 (PC)

235 2008 Aedas Ltd Temporary re-provisioning of Stanley Market, StanleyPlayground and Public Toilet

Stanley Main Street (Stanley BayReclamation Area) THK 1144

ASD51/5831/CG/UCC/001, ASD51/5732/RG/UCM/00

April 1999

236 2008 Wong & Ouyang (HK) Ltd Taikoo Primary School 1100 King's Road, Quarry Bay IL 8397 BD 2/3065/93 24 June 2002 (OP) / 8 July2002 (PC)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

237 2008 Wong Tung & Partners Ltd Cyberport Office Stage 1 Contract (C1) 100 Cyberport Road, Pok Fu Lam IL 8969 BD 2- October 2002238 2008 Leigh & Orange Ltd HKFYG Headquarters Redevelopment 21 Pak Fuk Road, Hong Kong IL 8990 BD 3/3035 7 December 2007 (OP)

239 2008 Ronald Lu & Partners (HK) Ltd Kau To Shan Residential Development (DoubleHeaven)

52 Ma Lok Path, Kau To Shan, NewTerritories STTL 82 BD 2/9230/95 3 June 2002 (PC)

240 2008 Aedas Ltd Refurbishment to Bea Building (W Square) 314-324 Hennessy Road, Hong Kong ML 122 RP & SD BD 2-3/3299 Jan 2008 (OP) / April 2008(PC)

241 2008 Aedas Ltd Proposed A&A Works at Trend Plaza (Cinema TMTL 282, Tuen Mun Town, New TMTL 282 BD 2-3/9001/84/10 June 2008242 2008 Aedas Ltd Dragon View Homantin Chung Hau Street, Homantin KIL 11075 BD 2/4046/95 January 1998

243 2008 Y.I. & Associates Ltd A&A Works for Manson House 74-78 Nathan Road, Tsim Sha Tsui,Kowloon KIL 6362 BD 2-3/4120/55/8 10 Nov 2007 (Notification

of BA 14) / 29 March 2008

244 2008 P & T Architects & Engineers Ltd MTRC Kowloon Station Development, Package 4 The Harbourside, Union Square, 1 AustinRoad West KIL 11080 BD 2-3/7204/99 July 2003 (OP) / February

2004 (PC)245 2008 Ronald Lu & Partners (HK) Ltd Proposed HKYWCA Guesthouse and Conference San Shek Wan, Lantau Island 727 in DD 332 BD 9020/04 28 August 2007

246 2008 Ronald Lu & Partners (HK) Ltd Public Transport Interchange (PTI) & PropertyDevelopment Enabling Works At Wu Kai Sha Station

Sha On Street, Ma On Shan, NewTerritories STTL 530 BD 2/7947/01(P) PT

II26 Nov 2004 (OP) / 17Dec 2004 (PC)

247 2008 Ronald Lu & Partners (HK) LtdSchool Improvement Programme (SIP) Final Phase -Package 4 S298 - Ma On Shan St. Joseph's SecondarySchool

8 Hang Kwong Street, Ma On Shan,Shatin, New Territories GLA ST-198 ASD 303/92301/CAA

K04 04 February 2005

248 2008 David S.K. Au & Associates Ltd Proposed Printing Factory at Tseung Kwan O IndustrialEstate

7 Chun Cheong Street, Tseung Kwan OIndustrial Estate, New Territories

TKOTL 39, ss1, sH & Extthereto BD 2/9252/96 P January 2008

249 2008 Wong & Ouyang (HK) Ltd Kowloon Station Development - Site B (Sorrento) 1 Austin Road KIL 11080 BD 2/7188/97-B Phase 1: 30 October 2002/ Phase 2: 16 October

250 2008 Simon Kwan Architect & Associates Ltd URA Redevelopment Project Johnston Road, Wanchai, Hong Kong IL 8997 BD 2/9032/03 August 2007251 2008 Simon Kwan Architect & Associates Ltd Residential Development at Haung Hau Station Tseung Kwan O, Area 38b TKOTL 24 BD 2/7232/02 December 2004252 2008 Simon Kwan Architect & Associates Ltd Regent On the Hill, Residential Development 183 Hammer Hill Road, Kowloon NKIL 6232 30 March 2000 (OP)253 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Commercial Development 620-628 Nathan Road, Kowloon KIL 10336 2001254 2008 Architecture Design & Research Group Ltd New Annex Block for Wah Yan College Hong Kong 281 Queen's Road East, Hong Kong IL 6935 BD 2/3063/02(P) November 2004

255 2008 P & T Architects & Engineers Ltd Redevelopment of St. Paul's Co-Educational CollegePrimary School 11 Nam Fung Path, Wong Chuk Hang N/A N/A End of August 2008

256 2008 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed Residential Development at Ma On ShanArea 77, STTL 487 1 Yuk Tai Street STTL 487 BD 2/9114/04 19 November 2007

257 2008 Ronald Lu & Partners (HK) Ltd Monte Vista, Residential Development Area 108, Ma On Shan, Shatin, NewTerritories STTL 446 BD 9068/96 March 2000

258 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Summit 41C Stubbs Road, Hong Kong IL 8870 BD 2/3006/96 September 2002

259 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Commercial Residential Development at 933King's Road 933 King's Road, North Point

QBML 4sCSS. 1SB / QBML4sCSS. 4SE / QBML 4sCSS.1SARP / QBML 4sCSS 1SASS1 / QBML 4sCSS 1RP

BD 3008/99 August 2002

260 2008 Wong Tung & Partners Ltd TMTL 374, So Kwun Wat, Tuen Mun TMTL 374, Area 55A, So Kwun Wat, TuenMun TMTL 374 BD 6/9025/97H September 2002

261 2008 Arch Design Architects Ltd Reprovision of Boarding Section of Princess AlexandarResidential School 9 Rehab Path, Kwun Tong, Kowloon KTIL 255 BD 2/4045/04

262 2008 PCMH Limited Residential Development at 8 Sai Wan Ho Street -Grand Garden 6-12A Sai Wan Ho Street, Hong Kong SIL 3sCRP, SIL 4sE, sF,sG,

SIL 5sAss4, ss5 & ss6 BD 3141/94 3 Oct 2007

263 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Office Twin Towers 223-231 Wai Yip Street & 39 King YipStreet, Kwun Tong KTIL 744 BD 4047/96 December 2008

264 2008 Hsin Yieh Architects & Engineers Ltd Composite Development (The Prominence)1 Kiu Kiang Street (for Domestic Units),1A Kiu Kiang Street (for G/F Shop A) &336 Tung Chau Street (for G/F Shop B)

NKIL 2263, 2175 SA & RP BD 4082/05 26 June 2008 (OP) / July2008 (PC)

265 2008 Steve Leung Architects Office Development 13A Chong Yip Street, Kwun Tong KTIL 444 BD 2/4134/93 23 February 2004 (OP)

266 2008 Ronald Lu & Partners (HK) Ltd Residential Development at STTL 481, Ma On ShanNew Town 1 Po Tai Street, STTL 481, Area 77 STTL 481 BD 9135/00 September 2003 (PC)

267 2008 P & T Architects & Engineers Ltd Residential Development at 10, 12, 16 & 18 Pollock'sPath, Hong Kong

10, 12, 16 & 18 Pollock's Path, HongKong RBL 513 RP & RBL 540 sec BD 2030/02 28 May 2007 (OP) / 30

July 2007 (PC)268 2008 P & T Architects & Engineers Ltd Proposed Industrial Redevelopment 1 Tai Yau Street, San Po Kong, Kowloon NKIL 4455 BD 2/4010/95 December 2007269 2008 P & T Architects & Engineers Ltd A Primary School at Hiu Kwong Street, Sau Mau Ping 130 Sau Ming Road, Sau Mau Ping N/A August 2008270 2008 Ronald Lu & Partners (HK) Ltd Proposed Student Quarters at STTL 437, CUHK The Chinese University of Hong Kong STTL 437 BD 2/9206/98(P) October 2002

271 2008 Ronald Lu & Partners (HK) Ltd School Improvement Programme Final Phase Package4 Stewards Pool Kei Primary School (P449)

Lok Ha Square, Fo Tan, Sha Tin, NewTerritories GLA-TST 58 ASD 303/6487/AL

L360/C25/001 24 August 2005

272 2008 Ronald Lu & Partners (HK) Ltd (01521 NT) Hong Chi Pinehill No. 2 School Pinehill Village, Chung Nga Road, NamHang, Tai Po, New Territories TPTL 34 BD 2/3101/01(P) 21 April 2005

273 2008 Leigh & Orange Ltd ASD School Improvement Programme Phase IV,Package II, De La Salle School Kam Tsin Village, Sheung Shui DD 92 Lot 2434 BD 3017/01(P) 6 July 2004

274 2008 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Pok Oi Hospital, Au Tan, Yuen Long, NewTerritories Lot No 1630 in DD 115 BD 2/9164/00 April 2006

275 2008 Y.I. & Associates LtdAlteration and Additions, Structural Investigation andStrengthening Works, Pedder Building, 12 PedderStreet, Hong Kong

12 Pedder Street, Central, Hong Kong IL 2319 BD 2-3/1003/82(FS)Pt. III 4 June 2008

276 2008 Wong & Ouyang (HK) Ltd Redevelopment of Au Shue Health Centre, Hong KongBaptist Hospital 330 Junction Road, Kowloon NKIL 5907 BD 2/4048/03 March 2008

277 2008 Eddie Chan Architects Limited Proposed Composite Building 120 Stanley Main Street, Hong Kong Stanley Inland Lot No. 95 BD 2/2048/01 1 November 2007

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

278 2008 Aedas Ltd Tradeport Logistic Centre, Hong Kong InternationalAirport

Logistics Centre Development at SCD,HKIA, Chun Yue Road, CLK, Lantau

Remaining Portion of ChekLap Kok No. 1 & Extension,Development Lot 805

December 2003

279 2008 Aedas Ltd Cheung Chau Fireboat Station Cheung Chau Sai Tai Road, CheungChau STTCX 1439

ASD55/92050/CWO/036-06/BP

March 2008

280 2008 P & T Architects & Engineers Ltd Inland Lot No. 452, New Private Independent School 19 Shun Wan Road, Aberdeen, Hong IL 452 BD 2/2007/03(P) 27 August 2007

281 2008 John Hui & Associates Hostel and Amenity Building For Shue Yan College onLot No. 8956, Wai Tsui Crescent, North Point, Hong

Wai Tsui Crescent, North Point, HongKong IL 8956 BD 3006/00 18 February 2005

282 2008 John Hui & Associates Rebuilding Work For Pico Factory 12A, Dai Fat Street, Tai Po IndustrialEstate, Tai Po, New Territories TPIL 1sMss4 BD 2/9088/04 10 July 2006

283 2008 Aedas Ltd Addition of Two Storeys to the Existing Kwai ChungColumbarium

11 Wing Hau Street, Kwai Chung, NewTerritories OZP No S/KC/21 ASD 010696 October 2008

284 2008 Aedas Ltd Knutsford Steps - A&A Miramar Shopping Centre 132-134 Nathan Road, 1-23 Kimberly KIL 6454 April 2004285 2008 Ronald Lu & Partners (HK) Ltd Residential & Retails Development at 18 Farm Road 18 Farm Road, Ma Tau Wai, Kowloon KIL 11145 BD 2/4060/00 July 2004286 2008 Aedas Ltd Retail Design for Emperor Plaza 55 Chung On Street, Kowloon 1978 DD 449 BD 2-3/9221/8818 November 2008287 2008 MDVISTA Ltd Oil Street Hotel 15-17 Oil Street, North Point, Hong Kong IL 7106 SA & Ext BD 2/3003/99 Pt. VI October 2008

288 2008 Ronald Lu & Partners (HK) Ltd Public Transport Interchange and PropertyDevelopment above KCRC Tai Wai Station KCRC MOS Rail, Tai Wai Station ST. MISC 124 BD 2/7960/02(P) March 2005 (OP) / April

2005 (PC)289 2008 David S.K. Au & Associates Ltd Residential Re-development 15 Bluff Path, The Peak, Hong Kong RBL 547 SA & 560 SA BD 2029/03 5 June 2008290 2008 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Nam Long Shan Road, Aberdeen Lot AIL 417 BD 3008/00(P) September 2002

291 2008 Simon Kwan Architect & Associates Ltd Proposed Composite Development at NKIL 6365 500 Tung Chau Street, Cheung Sha Wan,Kowloon NKIL 6365 BD 4082/04 July 2008

292 2008 Spence Robinson Ltd KCRC Bus Depot Renovation KCRC Light Rail Division, Bus Depot,Tuen Mun August 2001

293 2008 WCWP International Ltd Renovation Works at Raimondi College PrimarySection

1-E, Shiu Fai Terrace, Stubbs Road,Wanchai, Hong Kong IL 7936 BD 2-3/2259/63/4 August 2008

294 2008 Ronald Lu & Partners (HK) Ltd Imperial Villa Phase II 1 Ping Chuk Lane, Ping Shan, Yuen Long 2051 in DD 121 BD 9162/01 November 2003295 2008 A & T Design Ltd No. 1, Star Street 1 Start Street, Wanchai, Hong Kong March 2001

296 2008 Ronald Lu & Partners (HK) Ltd SIP Final Phase - Package Four S297 Lok Sin Tong KoHsiao Lin Secondary School Area 2A, Lung Hang Estate, Shatin

VO No 84 (Plan No.STM6154A), Land Status:School is vesting on HousingAuthority Land

ASD62/6487/EX5/E20/500(297)

25 January 2006 (PC)

297 2008 Wong & Ouyang (HK) Ltd Bel-Air On the Peak (RV) Cyberport Road, Telegraph Bay,Pokfulam, Hong Kong (Stages 10-12) IL 8969 SB BD 2/2042/99/ST10-

ST12(A) 2008

298 2008 Chau Ku & Leung Architects & Engineers Ltd Hin Tin Public Swimming Pool, Phase II 68 Che Kung Miu Road, Sha Tin Completion 2007

299 2008 Aedas Ltd AIG Tower 1 Connaught Road Central, Hong Kong ML 275 & ML 278(SA) & (RP) BD 2004/01 April 2005 (OP) / May2005 (PC)

300 2008 K.A. Kho & Associates Architects & Consultants Ltd Proposed Factory Building Hong Yip Street, Tung Tau IndustrialArea, Yuen Long YLTL 497 BD 2/9122/05 September 2007

301 2008 P & T Architects & Engineers Ltd Residential Development at 57 Shouson Hill Road 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD 2/3016/97 April 2003

302 2008 Ronald Lu & Partners (HK) Ltd ASD School Improvement Programme Final Phase(Package 4) Pui Ying College

S361 Pui Ying College, Wo Che Estate, 9Fung Shun Street, Shatin, New Territories BO103 Plan No. STM6154 ASD

303/6487/EX/E20/S3 31 May 2005

303 2008 Leigh & Orange Ltd ASD School Improvement Programme Phase IV,Package II, St. Patrick's School

12 Fu Mei Street East, Wang Tau Hom,Kowloon NKIL 4720 BD 2/3079/02(P) 28 July 2005

304 2008 Leigh & Orange Ltd Hong Kong Baptist University, School of ContinuingEducation, Shek Mun Campus 8 On Muk Street, Shek Mun, Shatin STTL 540, Area 11 BD 9107/03 July 2006 (PC)

305 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development Project at Ma On Shan Area 77, Ma On Shan STTL 481 BD 2/9251/96H (P) August 2001

306 2008 AGC Design Ltd School Improvement Programme (Final Phase) forFortress Hill Methodist School 19 Fortress Hill, North Point, Hong Kong Government Land (THK -

1220)

20 November 2004(Phase 1) & 11 September2004 (Phase 2)

307 2008 AGC Design Ltd Tung Chung Station Development Package 1 Tung Chung Town Lot 2 TCTL 2 BD 4/7302/94(P) Pt. II 21 November 2005

308 2008 Wong Tung & Partners Ltd Tsing Yi Station Residential Development 33 Tsing King Road, Tsing Yi TYTL 132 BD 2/7162/93-T 2 December 1999 (OP) / 8January 1999 (PC)

309 2008 Aedas Ltd Limousine Lounge, CLK Airport Hong Kong International Airport CLK Lot No. 1 RP & the ext.thereto BD 2-3/9133/03 February 2005

310 2008 Spence Robinson Ltd Alteration & Additional Works at 1/F, 2/F & 3/F, 37-39Ma Tau Wai Road, KML 40S ORP 37-39 Ma Tau Wai Road KML 40 SeC ORP BD 2-3/4037/80/13 14 November 2006

311 2008 Rocco Design Architects Ltd Commercial Development at NKIL 6310 J/O Sheung Yuet Road and Wang Chiu NKIL 6310 Anticipated September

312 2008 Aedas Ltd Redevelopment of Garley Building 233-239 Nathan Road, Kowloon KIL 1993-1994, 1402 SC &1402 RP BD 2/4040/03 June 2007

313 2008 Ronald Lu & Partners (HK) Ltd Redevelopment of Upper Wong Tai Sin Estate - Phase1

Upper Wong Tai Sin Estate, Lung CheungRoad, Kowloon March 2000

314 2008 SLHO & Associates Ltd New Residential Development at San Lau Street 2C & 2D San Lau Street, Kowloon BD 3/4163/93 28 January 2004

315 2008 David S.K. Au & Associates Ltd Proposed Alteration and Addition Works to ChingChung Sin Yuen Tsing San Path, Tuen Mun TMTL 253 BD 2/9152/99 expected date of OP: 29

September 2008

316 2008 Architectural Services Department New Fanling Magistracy Building Area 11, Pik Fung Road, Fanling (Lot No.DN324) DN 324 ASD 51-1377 March 2002

317 2008 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd Tsing King Road, TYTL 163 Easeful Court TYTL 163 BD 3/9042/00H 24 April 2003

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

318 2008 P & T Architects & Engineers Ltd Residential Redevelopment at RBL 647 at No. 3-5Plunkett's Road, The Peak, Hong Kong

No. 3-5 Plunkett's Road, The Peak, HongKong RBL 647 BD 2024/04 9 April 2008

319 2008 Wong Tung & Partners Ltd Hong Kong Movie City Tseung Kwan O Area 106, Sai Kung TKOTL 85 March 2005320 2008 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008321 2008 Woods Bagot Asia Ltd Alteration & Additional Works to Tsim Sha Tsui Centre 66 Mody Road, Tsim Sha Tsui East, KIL 10477 BD 2-3/4198/77/12 May 2006

322 2008 Chau Ku & Leung Architects & Engineers Ltd Reprovisioning of Kei Tsz Primary School & new LCSDPlayground Tsz Wan Shan, Wong Tai Sin, Kowloon NK 703

ASD55/92050/CWO/017/03/BP

(Completion inspection) 25September 2006 / 13 July2006 (PC)

323 2008 Leigh & Orange Ltd School Improvement Programme Phase IV Package 6Canossa College 8 Hoi Tai Street, Quarry Bay, Hong Kong IL 8570 BD 2/3007/00H August 2008

324 2008 Leigh & Orange Ltd School Improvement Programme Phase IV Package 2Holy Carpenter Prevocational School 10 Tai Wan Road, Hung Hom, Kowloon HHIL 544 BD 3010/02(P) 7 October 2004

325 2008 Lu Tang Lai Architects Ltd Light Industrial Building at No. 78 Hung To Road, KwunTong

No. 78 Hung To Road, Kwun Tong,Kowloon KTIL 159 BD 2/4063/05 30 April 2008

326 2008 LWK & Partners (HK) Ltd Le Point - Tiu Keng Leng Station Tiu Keng Leng Station Development Area73B, Tseung Kwan O, New Territories TKOTL 73B BD 7200/98 25 October 2007 (OP) / 5

February 2008 (PC)

327 2008 Associated Architects Ltd Composite Building 27-33 & 35-37 Centre Street, Sai YingPoon, Hong Kong

IL 758 sB, sD, sE, sF, sG &sH BD 2/2042/94 April 2002

328 2008 Wong & Ouyang (HK) Ltd Redevelopment of Yau Tong Estate Phase 5 Lei Yue Mun Road, Yau Tong Vesting Order 52 N/A July 2002 (PC)329 2008 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Chan Cho Chak Primary School Jat Min Chuen, Shatin, New Territories STTL 28 BD 3/3102/01(P) October 2005330 2008 Ronald Lu & Partners (HK) Ltd Centenary Complex Building for Alliance Bible 22 Peak Road, Cheung Chau, Hong Kong Cheung Chau Lot No. 1764 BD 2/9285/97 November 1999

331 2008 Ronald Lu & Partners (HK) Ltd School Improvement Programme SKH Tsang Shui TimSecondary School (S327) Wo Che Estate, Shatin, New Territories

Housing Authority VestingOrder No. VO103 Plan No.STM 6154A

13 June 2005 (PC forMajor Section)

332 2008 Aedas Ltd New Chapel for the Church of Jesus Christ of Latter-Day Saints 15 Po Lam Lane, Tseung Kwan O TKOTL 45 N/A March 2000

333 2008 Aedas Ltd Addition & Alteration Works Sheraton Hotel & TowersHong Kong 20 Nathan Road, Kowloon KIL 9172 November 1998 (PC)

334 2008 Aedas Ltd Holiday Inn Golden Mile Podium Renovation (Stage B) 50 Nathan Road, Tsim Sha Tsui, Kowloon KIL 9344 BD 2-3/4350/61/1230 June 2008 (OP) / 24July 2008 (PC) - 2 Phasesof A&A Works

335 2008 Spence Robinson LT Ltd A&A Works for Residential Development 30 La Salle Road NKIL 3458 BD 2-3/4097/82 Early September 2008

336 2008 A. Lead Architects Ltd Hotel Development 148A, 148B, 148-160 Tung Lo Wan Road,Hong Kong IL 2609 RP & SA BD 2/3091/97H December 2000

337 2008 Cheung Kong Yeung Architects Ltd Residential Redevelopment No. 46 Plantation Road RBL 697 BD 2001/03 15 February 2007

338 2008 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

HKHS Sandwich Class Housing Development in Area24, Tseung Kwan O

The Pinnacle, 8 Wan Hang Road, TseungKwan O TKOTL 37 BD 2/9237/94 16 September 1998

339 2008 RMJM (HK) Ltd School Improvement Programme Final Phase Package2

School No S340 St. Stephen's College, 22Tung Tau Wan Road, Stanley, Hong Kong RBL 432 RP & Ext BD 2/3111/01(P) 7 March 2006

340 2008 P & T Architects & Engineers Ltd The Construction of a Special School for SeverelyMentally Handicapped Children in Area 32, Tin Shui 17 Tin Tan Street, Tin Shui Wai N.A. N.A. May 2007

341 2008 Kwong & Associates Ltd Relocation of Lo Wu Saddle Club Ho Sheung Heung Road, Sheung Shui,New Territories STT 1408 BD 2/9115/06(P) 17 September 2007

342 2008 RMJM (HK) Ltd CLP Substation at Tai Kok Tsui Yen Ming Road, Tai Kok Tsui KIL 11142 BD 4053/00 (TKT) 7 April 2003343 2008 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road Street KIL 2097 sE, RP BD 2/4187/91 August 2001344 2008 Wong Tung & Partners Ltd Cineplex, Taikoo Shing Taikoo Shing Cityplaza 1 27 November 2000

345 2008 Lu Tang Lai Architects Ltd The Forest Hill 99 Po Kong Village Road, Kwun Tong,Kowloon NKIL 6272 BD 2/4065/04 19 March 2008

346 2008 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East

IL47AsARP, IL47AsBRP,IL47AsCRP, IL47ARP,IL47BsCRP, IL47BRP,IL47AsBss2, IL47AsD,IL47BsD, IL47BsBRP,IL47BsARP, IL47CsARP,IL47CsAss1RP, IL47CRP,IL47DRP, IL47DsARP,IL47sBRP, IL47sAss1,IL47sCss1 & ExtensionThereto, IL47sCss2sA,IL47sCss2RP, IL47sCss3sA,IL47sCss3RP, IL47sCss4,IL47sCss5 & ExtensionThereto, IL47sCss6sRP,IL47sCss6sA, IL47sCss7RP,IL47sCRP, IL47sBss1,IL47sARP, IL47sP, IL47RP,IL47sP, IL47RP

BD 3019/01 February 2007

347 2008 Tom Ip & Partners Architects, Engineers & DevelopmentConsultants Ltd

Proposed Domestic Building on IL2392 - 2393 at No.11-13 Sand Street, Hong Kong 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001

348 2008 Planning Services International (Asia) Ltd Outdoor Training of Outward Bound School Outward Bound School Ah Kung Wan, TaiMong Tsai, Sai Kung STT No. SX627 at D.D. 252 BD 2/9018/02(1) (P) 30 August 2005

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

349 2008 Ma & Fong & Associates Ltd Commercial / Office Bldg at 674-682 Nathan Road 674-682 Nathan Road, Kowloon TBA TBA July 1997 (OP) / May 1997(PC)

350 2008 Aedas Ltd A&A Works at B1/F to 2/F, Podium, The Landmark The Landmark, 15 Queen's Road, Central

ML 7sARP, ML7sAss3,ML7sBRP, L2c, IL3087,ML3sA, ML2sB, ML2sARP,ML2RP, ML2AsBRP

10 June 2008

351 2008 Wilkinson & Cilley Ltd The Hong Kong Golf Club Proposed Golf Cart StorageBuilding 1 Fan Kam Road, Fanling, New Territories Lot 942 in DD 94 BD 2/9141/00 November 2001

352 2008 Aedas Ltd Ocean Park Redevelopment Back of House For Aviary 180 Wong Chuk hang Road, Hong Kong RBL 1020 & Ext BD 2/2010/06 October 2008

353 2008 Wong & Ouyang (HK) Ltd One Kowloon, Commercial Building 1 Wang Yuen Street, Kowloon Bay, NKIL6268 NKIL 6268 BD 2/4024/00 March 2007 (OP)

354 2008 Wong & Ouyang (HK) Ltd Bellagio 33 Castle Peak Road, Sham Tseng, NewTerritories Lot No. 269 in DD 390 BD 2/9121/96 May 2002

355 2008 Architectural Services Department Tuen Mun Hospital Rehabilitation Block Tsing Chung Koon Road, Tuen Mun, NewTerritories Inform No. 6603 29 June 2007

356 2008 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Commercial & Residential Development at Tseung Tseung Kwan O Area 57, Phase 1 Tseung Kwan O Area 57 BD 2/9136/97/H 15 October 2002

357 2008 Leigh & Orange Ltd Haven of Hope Holistic Care Centre 19 Haven of Hope Road, Tseung Kwan ORoad

Tseung Kwan O Lot No 742in SD No. 5 BD 4/9079/02 August 2006

358 2008 Aedas Ltd Major Renovation Works at Cheung Fat ShoppingCentre

Cheung Fat Shopping Centre, Cheung FatEstate, Tam Kon Shan Road, Tsing Yi TYTL 172 BD 22-3/9190/06

359 2008 Wong & Ouyang (HK) Ltd Redevelopment of Golden Theatre 94 Yen Chow Street, Kowloon NKIL 2770 RP & Ext 2785 sB& Ext BLD(B) 2/4099/91 December 1993

360 2008 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road Central ML 14 BD 1/2065/94 November 1999 (OP) /December 1999 (PC)

361 2008 P & T Architects & Engineers Ltd 661-665 King's Road 661-665 King's Road, North Point, HongKong IL 8885 30 September 1999 (OP) /

30 March 2000 (PC)362 2008 JADL Design Ltd Alteration & Addition to Wing On Central Building 26 Des Voeux Road, Central, Hong Kong RPS 06 IL 5558 & 5559 BD 2-3/2449/61 January 2002

363 2008 Aedas Ltd Rest Garden & New Service Building at Sheung LokStreet Playground

Sheung Lok Street Rest Garden (Site B),Kowloon City District October 2006

364 2008 Wong Tung & Partners Ltd Commercial / Service Apartment at 138 Yeung UkRoad, Tsuen Wan, New Territories

124-142 Yeung Uk Road, TWTL 406,Tsuen Wan TWTL 406 1 August 2005 (OP) /

October 2005 (PC)

365 2009 David S.K. Au & Associates Ltd Proposed Transposer Station of DTTB Project AtKowloon Peak

Kowloon Peak, Sai Kung on STT No SX3470 STT No SX 3470 BD 2/9160/06(P) 3 July 2009

366 2009 Tom Ip & Partners Architects, Engineers & DevelopmentConsultants Ltd

Proposed Domestic Building on IL2392 - 2393 at No.11-13 Sand Street, Hong Kong 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001

367 2009 Wong & Ouyang (HK) Ltd Devon House - Phase 2 979 King's Road, Quarry Bay, Hong Kong QBML 1sEss2, QBML1sFss1, QMBL 1sF RP & ML BD 2/3025/00 April 2003

368 2009 P & T Architects & Engineers Ltd Vocational Training Council, School of Business andInformation Systems TYTL 123, Tsing Yi Road, Tsing Yi Island TYTL 123 BD 9093/02(P) Sep 2004

369 2009 LCK Architects Ltd Proposed New Fung Kai Primary School 19 Jockey Club Road, Sheung Shui FSST Lot No 232 BD 9181/04 10 Oct 2008

370 2009 Aedas Ltd Sky Plaza - North Office Tower Hong Kong International Airport, Chek LapKok

CLK Lot No 1 RP & the Extthereto BD 2/9062/03(3)(P) October 2006

371 2009 David S.K. Au & Associates Ltd Proposed New Power Centre (Phase 1) and DanceStudio (Phase II) at TVB City

TVB City, 77 Chun Choi Street, TseungKwan O Industrial Estate, N.T.

TKOTL 39 sKss 1RP, sKRP,sMsVss 1RP, sX and ExtThereto

BD 9012/07 (Phase1) ; BD 9126/99 (2)/4(Phase II)

Tentative Aug 2009(Phase I) ; Tentative June2009 (Phase II)

372 2009 K & W Architects Limited Proposed Alteration and Addition Works Block A, 15 Wylie Path, Kowloon KIL 10658 BD 2-3/4029/82/6 5 August 2009373 2009 Aedas Ltd Back of House for Marine Mammal Ocean Park, Headland, Hong Kong RBL 1020 BD 3/2012/06(P) 4 November 2008

374 2009 Aedas Ltd Skypier 2 Hong Kong International Airport, Chek LapKok

CLK Lot No 1 RP & the Extthereto BD 4/9028/05(P) July 2009

375 2009 Archiplus International (HK) Ltd Residential Development at 38 Shelley Street, Mid-Levels, Hong Kong 38 Shelley Street

IL 348 SCRP, SCSS 1RP,SCSS 1 SSAS1,SCsS1ssARP & IL 344 RP

BD 2050/05 August 2008

376 2009 Aedas Ltd Terminal Expansion Project (Terminal 2) For AsiaAirfreight Terminal

10 Chun Ping Road, Hong KongInternational Airport, Chek Lap Kok

CLK Lot No 1 RP & the Extthereto BD 2-3/9011/04(s) December 2006

377 2009 A & T Design Ltd The Apex Horizon (Phase II) 33 Wo Yi Hop Road, Kwai Chung, NewTerritories KCTL 467 BD 2/9026/01 2 November 2007

378 2009 Steve Leung Architects Proposed Residential Development 8 College Road, Kowloon Tong, Kowloon NKIL 2494 SA & SB BD 4006/05 August 2009

379 2009 Chau Ku & Leung Architects & Engineers Ltd 305 Castle Peak Road & 7 Fat Tseung Street on NKIL939

305 Castle Peak Road and 7 Fat TseungStreet, Cheung Sha Wan, Kowloon NKIL 939 BD 2/4007/05 28 February 2008

380 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Summit 41C Stubbs Road, Hong Kong IL 8870 BD 2/3006/96 September 2002

381 2009 RMJM (HK) Ltd Residential Development at No. 99 Peak Road, ThePeak, Hong Kong 99, 101, 103 Peak Road, The Peak RBL No. 1147 BD 2/2039/99 13 February 2003 (OP) ;

January 2003 (PC)

382 2009 A & T Design Ltd Princeton Tower 88 Des Voeux Road West, Hong Kong The Remaining Portion ofInland Lot No 3999-4005 BD 2/4011/07 14 November 2003

383 2009 Rocco Design Architects Ltd Salesian Yip Hon Millennium Primary School Shek Lei Estate, Shek Pai Street, KwanChung, New Territories

Permanent Government LandAllocation (GLA) KT 1141

Contract No: SSM312 ; ProgrammeNo: 306 EP

31 July 2005

384 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd FSSTL 126, Area 9, Fanling, New Territories (Belair 3 Ma Sik Road, Fanling, New Territories FSSTL 126 BD 2/9003/95 1998 (OP) ; 1999 (PC)

385 2009 Aedas Ltd Ocean Park Astounding Asia Panda Trail 180 Wong Chuk Hang Road, Aberdeen,Hong Kong RBL 1020 & Ext BD 2/2049/06(P) February 2009

386 2009 K & W Architects Limited The Aegean 2 Tsing Fat Street, Tuen Mun, New TMTL No 424 BD 2/9292/98 20 December 2004 (OP)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

387 2009 Ronald Lu & Partners (HK) Ltd One Silver Sea 18 Hoi Fai Road, Kowloon KIL 11158 BD 2/4011/02 23 June 2006388 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed New Building on YTIL 38 6 Cho Yuen Street, Yau Tong, Kowloon YTIL 38 BD 2/4068/04 2 March 2009

389 2009 P & T Architects & Engineers Ltd Redevelopment of the Craigengower Cricket Club,Phase 2

188 Wong Lai Chung Road, Happy Valley,Hong Kong IL 8881 BD 3/3001/04 October 2006 (OP) ;

December 2006 (PC)390 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Y.I. - Private Residential Development 8B and 10 Tai Hang Road, Hong Kong IL 8886 BD 2/3038/95 December 2000391 2009 Aedas Ltd Kowloon Station Retail Centre at Union Square Site E, 1 Austin Road West, Kowloon KIL 11080 BD 2/7224/01 4 May 2006392 2009 Planning Services International (Asia) Ltd Kowloon Cricket Club (New Sports Building) 10 Cox's Road, Tsim Sha Tsui KIL 11052 BD 4058/98 December 2001

393 2009 David S.K. Au & Associates Ltd Alteration & Additional Works at St. James' SettlementHeadquarter Building

85 Stone Nullah Lane, Wanchai, HongKong HKIL 8603 BD 2/3012/06 26 March 2009

394 2009 David S.K. Au & Associates Ltd Yan Hing Industrial Building at Tseung Kwan OIndustrial Estate

Subsection 1 of section J of Tseung KwanO TKOTL 39 and Ext Thereto BD 9042/96(P) 19 July 1999

395 2009 P & T Architects & Engineers Ltd Craigengower Cricket Club (Phase I) Happy Valley, junction of Leighton RoadAnd Wong Nai Chung Road IL 8881 BD 2/3070/01 (Ph.1) 14 October 2003 (OP) ; 4

December 2003 (PC)396 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Building 712 Prince Edward Road East, Kowloon NKIL 4795 sA, sB & RP BD 2/4084/05 9 January 2009

397 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lee Garden (Manulife Plaza) J/O 33-37 Hysan Avenue, 7-11 Yun PingRoad and 20-24 Lan Fong Road

IL 29 sec DD, IL 457 sec L, IL29 MM, IL 29L RP & IL 457 1998

398 2009 Wong Tung & Partners Ltd Lai Sing Court 13-15 Tai Hang Road, Hong Kong IL 7903 & Ext BD 3/3048/01 November 2009399 2009 P & T Architects & Engineers Ltd Inland Lot No. 452 New Private Independent School 19 Shum Wan Road, Aberdeen, Hong IL 452 BD 2/2007/03 27 August 2007400 2009 Wilton Wong Architects Ltd Conversion Works at Rosaryhill School 41B Stubbs Road, Hong Kong IL 3550 RP & Ext BD 2-3/2353/62/3 October 2009

401 2009 Ronald Lu & Partners (HK) Ltd HKU Space Po Leung Kuk Community College 66 Leighton Road, Causeway Bay, HongKong IL 9011 BD 2/3053/02 21 May 2008

402 2009 Andrew Lee King Fun & Associates Architects Ltd Residential Development at 220-222 Tai Kok Tsui Road 220-222 Tai Kok Tsui Road KIL 11159 BD 2/4002/00H (Pt. 6 October 2008

403 2009 HB & L Limited Construction of Permanent Public Transport Terminusat Tin Yan Road

Tin Yan Road, Tin Shui Wai, NewTerritories TSWTL 24 Area 33 BD 2/9061/02(2) 9 January 2008 (OP) ;

February 2008 (PC)

404 2009 Wong Pak Lam & Associates Proposed Residential Redevelopment at Nos 440-450Prince Edward Road West 448 Prince Edward Road West, Kowloon NKILs 2148, 2149, 2150,

2151, 2152, 1432 sA and RP BD 2/4041/04 May 2008 (OP) ; July 2008(PC)

405 2009 H.C. Wu Architect & Associates Proposed Residential Development at Tan Kwei Tsuen Tan Kwei Tsuen, Yuen Long, New Lot 4296 in DD 124 BD 9015/97 March 2005 (OP)

406 2009 David S.K. Au & Associates Ltd Expansion and Renovation Works Eu Yan Sang (HK)Ltd at Yuen Long Industrial Estate Yuen Long Town Lot No 313, Subsection 2 of

Section H BD 2-3/9039/05 30 June 2006

407 2009 Spence Robinson Ltd Addition and Alteration Works at 5-7 Austin Road,Tsim Sha Tsui 5-7 Austin Road, Kowloon 8668 RP & 8113 BD 2-3/4113/73 April 2008

408 2009 Urbanage International Ltd TWGHS NKIL 5294 Chang Ming Thien College 300 Nam Cheong Street, Kowloon NKIL 5294 BD 2/3037/02(P) 15 July 2005409 2009 KLS International Architects & Planners Company Limited Alterations and Additions at Majestic Hotel 348 Nathan Road, Kowloon KIL 6733 BD 2-3/4001 December 2006

410 2009 K & W Architects Limited No. 11 Bonham Road, Hong Kong 11-11A Bonham Road, 1-4, 7-10 WestEnd Terrace, Hong Kong

ss1 of sF RP of sF, ss of sERP of sE, RP of SB, ss4 ofSA, ss5 of sA & RP of IL 689

BD 2/2032/97 June 2004

411 2009 Design Corporation Ltd Anderson Road, Sai Kung Anderson Road, Sai Kung, NewTerritories, Lot No. 1984 in SD2 Lot No 1984 in SD2 BD 2/9186/04(Pt. III) 27 March 2009

412 2009 JA Design Architects Ltd Proposed Residential Development at Inland Lot No 632 King's Road, North Point, Hong Kong IL 8930 BD 3077/02 February 2006413 2009 RMJM (HK) Ltd Jockey Club World Wide Fund for Nature Marine Life Hoi Ha Wan, Sai Kung West Country Park Lot No 448 in DD 283 May 2003414 2009 Aedas Ltd Through-Train Primary And Secondary School Chi Shin Street, Tseung Kwan O, Area 65 ASD 14/85348 August 2006415 2009 Aedas Ltd Alteration & Addition Works of Trend Plaza (North 2 Tuen Hop Street, Tuen Mun TMTL 282 BD 2-3/9001/84/8 June 2006

416 2009 Wong & Ouyang (HK) Ltd The Orchards, Residential Development at TaikooValley

Taikoo Valley, Greig Road, Quarry Bay,Hong Kong IL 8397 BD 2-4/3066/95H 3 July 2003

417 2009 Aedas Ltd Tung Chung Cable Car Consultancy: Tung Chung 11 Tat Chung Road, Tung Chung, Lantau NIL BD 3/9905/03(TCT) May 2006

418 2009 Wong Tung & Partners Ltd Cityplaza 2 Hotel Cityplaza 2 at combined site VA & VC inTaikoo Shing, Quarry Bay, Hong Kong QBML 2 & Ext BD 2/3049/93 3 June 2009

419 2009 Wong & Ouyang (HK) Ltd Redevelopment of La Salle Primary School La Salle Road, Kowloon NKIL 5384 BD 2/4015/00(P) Phase 1 - July 2002 ;Phase 2 - December 2004

420 2009 WMKY Ltd A commercial Redevelopment of Tak House 5-11 Stanley Street, Central IL 4413-4416 BD 2017/04 7 April 2009

421 2009 David S.K. Au & Associates Ltd So Kwun Wat 132kV Substation So Kwun Wat Substation, So Kwun Wat,Tuen Mun

TMTL 450, Area 55, So KwanWat, Tuen Mun BD 2/9194/99 August 2003

422 2009 Spence Robinson LtdProposed New Open Niches Across Section 24A, 25,26, 34 and 37 at Cape Collinson Chinese PermanentCemetery

Chai Wan, Hong Kong IL 7715

BD 2/3009/05(P) -Section 24A, 25 and26) ; BD 2/3019/05(P)- Section 34 and 37

15 December 2006 (OP)

423 2009 Wong & Ouyang (HK) Ltd Kowloon Station Development Package 6, Tower 21 Union Square, 1 Austin Road West, KIL 11080 BD 2/7219/00(F) March 2007

424 2009 A. Lead Architects Ltd Commercial Development at 12 Sai On Street 12 Sai On Street / 20-28 ChengTu Road,Aberdeen, Hong Kong AIL 81 RP BD 2-3/2477/70

425 2009 P & T Architects & Engineers Ltd Indoor Recreation Centre Community Hall cum Library Area 17, Tung Chung, Lantau Island SSP 314 September 2009

426 2009 Leigh & Orange Ltd School Improvement Programme Phase IV Package 2,Group 3, P5, St. Joseph Primary School 48 Wood Road, Wanchai, Hong Kong IL 8176 BD 2-4/3030/01(P) January 2005

427 2009 Arch Design Architects Ltd The Extension of Ma Wui Hall, Youth Hostel Top of Mt. Davis Path, Mt. Davis Path,Hong Kong HX474 BD 2019/97 15 April 2000

428 2009 P & T Architects & Engineers Ltd Boardview Court at Shum Wan Road Shum Wan Road, Aberdeen IL 435 June 2000

429 2009 Aedas Ltd Addition of Two Storeys to the Existing Kwai ChungColumbarium

11 Wing Hau Street, Kwai Chung, NewTerritories OZP No S/KC/21 ASD 010696 October 2008

430 2009 John Hui & Associates Rebuilding Work for Pico Factory 12A, Dai Fat Street, Tai Po IndustrialEstate, Tai Po, New Territories TPTL 1sMss4 BD 2/9088/04 10 July 2006

431 2009 Amasia International Design Group Vertical Extension for Kiangsu Chekiang Primary 30 Ching Wah Street, North Point, Hong IL 7330 BD 2-3/3041/57 July 2004

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

432 2009 Spence Robinson Ltd Alteration & Additional Works at 1/F, 2/F & 3/F, 37-39Ma Tau Wai Road, KML 40S ORP 37-39 Ma Tau Wai Road KML 40 SeC ORP BD 2-3/4037/80/13 14 November 2006

433 2009 RMJM (HK) Ltd School Improvement Programme (SIP) Methodist 50 Gascoigne Road, Kowloon KIL 7068 4005/99H(P) 31 August 2004434 2009 WCWP International Ltd 86 Victoria Road 86 Victoria Road IL 8982 BD 2/2025 18 June 2009435 2009 Andrew Lee King Fun & Associates Architects Ltd Proposed Development at Lai Chi Kok Road 33 Lai Chi Kok Road, Kowloon KIL 6284 BD 2/4032/05 2 October 2008

436 2009 Ronald Lu & Partners (HK) Ltd A 24-classroom Primary School at Development nearChoi Wan Road and Jordan Valley, Kwun Tong 80 Choi Ha Road, Kwun Tong GLA NK 730

ASD55/92050/CWO/002-07/BP

Anticipated in August 2009

437 2009 Lu Tang Lai Architects Ltd Proposed Light - Industrial Development - The Pivot 52 Hung To Road, Kwun Tong, Kowloon KTIL 286 BD 2/4075/05 November 2008

438 2009 CYS Associates (HK) Ltd Heep Yunn School - SIP 1 Farm Road, Ma Tau Wai, Kowloon KILs 6272 and 3394 & Ext BD 2/3033/02(P)Section A - 4 February2005 ; Section B (A&A) -21 June 2005

439 2009 Eddie Chan Architects Limited New Hang Fook Camp 50A Kung Kok Shan Road, Ma On Shan,New Territories STTL 469 & Prop STTL 1008 BD 9138/98 June 2001

440 2009 Architecture Design & Research Group Ltd New Annex Block for Wah Yan College Hong Kong 281 Queen's Road East, Hong Kong IL 6935 BD 2/3063/02(P) November 2004441 2009 Design 2 (HK) Ltd Extension of ancillary Facilities of Chinese Rhenish 86A Bonham Road, Hong Kong IL 1924 BD 2/2019/99 31 August 2006442 2009 Ronald Lu & Partners (HK) Ltd Revitalization of Peak Tower 128 Peak Road, Hong Kong RBL 1104 June 2006 (PC)

443 2009 T. S. Chu Architects Ltd Residential Development at 11 Shatin Heights Road,Tai Wai, Shatin, New Territories

11 Shatin Heights Road, Tai Wai, Shatin,New Territories STTL 533 BD 9022/98 August 2004

444 2009 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road, Kowloon KL 3389 RP BD 4049/00 April 2006445 2009 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008

446 2009 Wong & Ouyang (HK) Ltd Redevelopment of Hong Kong Sanatorium & Hospital 2-4 Village Road, Happy Valley, HongKong

IL 1338 sARD, IL 1386 & Ext,IL 1702 & Ext, IL3284, IL3285 and IL 7964

BD 2/3027/03 30 April 2008

447 2009 Wong & Ouyang (HK) Ltd Starcrest 9 Star Street, Wanchai, Hong Kong IL 8853 BD 2/3001/94H November 1999

448 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tuen Mun Area 5B Development Tsun Wen Road & Shek Pai Tau Road,New Territories 396 December 1998

449 2009 Simon Kwan Architect & Associates Ltd Ma Wan Residential Development Phase 5 Ma Wan Island Lot 392 Ma Wan Island Lot 392 BD 9160/97H(6) June 2006

450 2009 Spence Robinson Ltd Proposed Hotel Development 12-22 Davis Street, Hong Kong IL 905 sAss7 RP, sD, sC, sB,sA and sAss12 BD 2/2024/06 Late November 2009

451 2009 Casa Design International Ltd 18-24 King's Road Hotel Development 18-24 King's Road, 7-9 Lau Sin Street and15 Tin Hau Temple Raod, North Point

I.L. No. 5379 R.P. andExtension BD 6/3006/97H March 2005

452 2009 Simon Kwan Architect & Associates Ltd Proposed Commercial / Residential Development at108 Hollywood Road and 1-17 Bridges Street

108 Hollywood Road, 1-17 Bridges Street,Central

IL 1594 RP, IL 218sAss2,sAss1, SARP, sB, sC, sD,ss2, sDss1, sDRP, sE, sF,sC, sD, ss2, sDss1, sDRP,sE, sF & RP, IL 1214 & BP,IL 2581 sA & RP, IL 2582sAss1, sARP, sB&RP, IL2583sA, IL 2584 sA & RP, IL2585, IL 2409 sA & RP and IL386 sA, sBss1, sBRP & RP

BD 2/2039/01 June 2006

453 2009 CYS Associates (HK) Ltd Proposed Residential Development at Babington Path 6D-6E Babington Path, Mid-Levels, HongKong IL 609C SDRP & IL 609C RP BD 2/2034/05 19 October 2009

454 2009 Aedas Ltd HIT Container Terminal 9 (North) Gatehouses Tsing Yi TYL 9 BD 2/7361/01 June 2004

455 2009 P & T Architects & Engineers Ltd A Primary and A Secondary School at Site 10, WestKowloon Reclamation, Sham Shui Po 1 and 3 Hoi Lai Street, Sham Shui Po GN 706 N/A July 2006

456 2009 P & T Architects & Engineers Ltd Proposed Industrial Redevelopment 1 Tai Yau Street, San Po Kong, Kowloon NKIL 4455 BD 2/4010/95 December 2007457 2009 P & T Architects & Engineers Ltd Redevelopment of Liu Chong Hing Bank Building 24 Des Voeux Road, Central Section A of ML 62 BD 2-3/2043/01 August 2006458 2009 P & T Architects & Engineers Ltd Canadian International School, Phase II 36 Nam Long Shan Road, Aberdeen Lot AIL 417 BD 3008/00(P) September 2002

459 2009 Ronald Lu & Partners (HK) Ltd Po Leung Kuk School Improvement Programme -Group 2 (S311)

Po Leung Kuk Wu Chung College, HengOn Estate, Ma On Shan STTL 500 SF September 2005

460 2009 TFP Farrells Ltd 53 Mount Davis Villas 53 Mount Davis Road, Pok Fu Lam IL 7208 RP & Ext BD 3/2029/02 February 2005

461 2009 Urbanage International Ltd The Chinese University of Hong Kong - Tung WahGroup of Hospitals Community College, Shan Tung J/O Shang Tung Street and Hak Po Street KIL 9520 and KIL 9519 BD 2/4025/02(P) and

BD 2/4026/02(P) 20 July 2005

462 2009 Wong & Ouyang (HK) Ltd Oxford House, Taikoo Place Westlands Road, Quarry Bay QBML Sc ss4, Sc ss7, QBML2 sD & Ext BD 3114/94 August 1999

463 2009 Aedas Ltd Proposed Alterations and Additional Works at KowloonCity Plaza 128 Carpenter Road, Kowloon NKIL 6056 BD 2-3/4007/90/6 September 2006 (PC)

464 2009 Archiplus International (HK) Ltd A&A Work at Wong Tai Sin Shopping Centre Wong Tai Sin Shopping Centre, UpperWong Tai Sin Estate, Lung Cheung Road, KIL 6438 BD 4089/06 June 2009

465 2009 Archiplus International (HK) Ltd Proposed Residential Development at 105, Chuk YeungRoad 105 Chuk Yeung Road, Sai Kung Lot No. 270 in DD 213 & the

Ext BD 9069/04 June 2009

466 2009 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O GLA ASD 302/5586/SSM336/001 March 2009

467 2009 P & T Architects & Engineers Ltd St. Mary's Canossian School - Proposed Extension 162 Austin Road KIL 9550 July 2003468 2009 P & T Architects & Engineers Ltd Canadian International School, Phase I 36 Nam Long Shan Road, Aberdeen AIL 417 BD 3/3056/95 March 1999469 2009 P & T Architects & Engineers Ltd 79 Hoi Yuen Road 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 4002/06

470 2009 P & T Architects & Engineers Ltd Tai Po Kau Interactive Nature Centre STT 1019 in DD 35, Tai Po Kau, NewTerritories STT 1019 October 2000

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

471 2009 Urbanage International Ltd Additional floor on GH Podium 11 Hong Chong Road, Hung Hom KIL 9853 RP and extensionarea 1 & 2 BD 2-3/4513/78/9 Mid August 2009

472 2009 Rocco Design Architects Ltd A Primary School at Cheung Sha Wan Road, ShamShui Po, Kowloon

Cheung Sha Wan Road, Sham Shui Po,Kowloon GLA NK 692 ASD 104/6529/SSM

313/C25/001 31 July 2005 (PC)

473 2009 Rocco Design Architects Ltd Teaching Complex at Western Campus, CUHK The Chinese University of Hong Kong,Shatin

RP of STTL 437 & ExtThereto BD 2/9091/02(Pt. II) 1 December 2008 (OP) ; 7

December 2008 (PC)

474 2009 P & T Architects & Engineers Ltd 14 Headland Road, Hong Kong 14 Headland Road, Hong Kong RBL 693 BD 2/2004/06 20 February 2009 (OP) ;August 2009 (PC)

475 2009 P & T Architects & Engineers Ltd Proposed Office Development at KTIL 192 Kwun Tong 81 How Ming Street, Kwun Tong, Kowloon KTIL 192 BD 2/4112/92 November 1998476 2009 Architecture Design & Research Group Ltd Redevelopment of Creative Kindergarten 6 Rutland Quadrant, Kowloon Tong NKIL 812 BD 4010/05 November 2006

477 2009 Leigh & Orange Ltd Area C, Hong Kong Science Park Phase 2 Hong Kong Science Park Phase 2, PakShek Kok, Tai Po, New Territories TPTL 182 BD 2/9083/03(2) (Pt

III) June 2007

478 2009 Aedas Ltd Renovation Works at Hau Tak Shopping Centre (PhaseI & II)

Hau Tak Shopping Centre, Hau TakEstate, Tseung Kwan O TKOTL 99 HD (ICU) E22-3/VO

No. 164 (AA) 17 January 2007

479 2009 Aedas Ltd Alexandra House 7-15 Des Voeux Road, Central or ChaterRoad, Central IL 1724, IL 1725 sARP & RP 2003

480 2009 Architecture Design & Research Group Ltd Extension and Alterations and Additions Works at MainBuilding & Administration Building Lingnan University

Lingnan University, 8 Castle Peak Road,Tuen Mun TMTL 376

March 2005 (Phase 5)(OP) ; January 2005(Phase 6) (PC)

481 2009 Chows Architects Ltd Proposed Residential Development - Green Crest 93 San Tam Road, Ngau Tam Mei, YuenLong, New Territories Lot No 4784 in DD 104 BD 2/9034/04 October 2006

482 2009 Design Consultants Limited Chinese International School Extension Project 1 Hau Yuen Path, Braemar Hill, Hong IL 8743 BD 2-3/3125/88/5 18 August 2005483 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Regence Royale 2 Bowen Road, Hong Kong IL 8834 and 8848 BD 2/2084/94 September 2001

484 2009 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RIII & RIVA) Cyberport, HongKong

Telegraph Bay, IL 8969, Pokfulam, HongKong Section B of IL 8969 BD 2/2042/99/ST 10-

12 December 2005

485 2009 Chows Architects Ltd Proposed Residentail Development at Lot No 4781 inDD 104

1 Fairview Park Boulevard, Yuen Long,New Territories Lot No 4781 BD 9174/04 29 May 2007 (OP) ; 29

August 2007 (PC)

486 2009 Aedas Ltd Haeco Hanger 3A & 3B 80 South Perimeter Road, Hong Kong The RP of Chek Lap Kok LotNo 1 & The Ext Thereto BD 2/9045/07 July 2009 (OP) ; July 2009

(PC)

487 2009 Ronald Lu & Partners (HK) Ltd Po Leung Kuk School Improvement Programme - MaKam Ming College - S309

38 Wah Ming Road, Fanling, NewTerritories Area 49B Bd 2/3074/02(P) May 2005

488 2009 Wong & Ouyang (HK) Ltd Bellagio Phase 1 33 Castle Peak Road, Sham Tseng, NewTerritories Lot No. 269 in DD 390 BD 2/9121/96 May 2002

489 2009 Aedas Ltd Redevelopment of 233-239 Nathan Road 233-239 Nathan Road KIL 1402 RP, 1402 sC, 1993,1994 BD 2/4040/03 April 2007 (PC)

490 2009 Daniel Tong Chartered Architect Proposed Residential Development 217-223 Prince Edward Road West, KIL 11143 BD 2/4050/99 February 2004491 2009 MDVISTA Ltd Harbour Grand Hong Kong 15-17 Oil Street, North Point, Hong Kong IL 7106 SA & Ext BD 2/3003/00 Pt V December 2008 (OP)

492 2009 Hsin Yieh Architects & Engineers Ltd International Christian Quality Music Secondary &Primary School

Po Kong Village Road, Diamond Hill,Kowloon NKIL 6358 BD 4040/01 27 August 2004 (OP) ;

End August 2004 (PC)493 2009 A. Lead Architects Ltd Alteration and Additional Work at 5/F and 6/F, Carpark 222 Waterloo Road, Kowloon NKIL 5906 BD 2-3/4033/83/5 March 2007494 2009 Hong Kong Housing Department Redevelopment of Sau Mau Ping Estate Ph. 9 Sau Ming Road, Sau Mau Ping, Kowloon 14/785/9 20 April 2001

495 2009 David S.K. Au & Associates Ltd Workshop & Office for Gammon Skanska Ltd Tseung Kwan O Industrial Estate Subsection 1 of section P ofTKOL 39 BD 2/9123/01 January 2003

496 2009 Lu Tang Lai Architects Ltd 8 Royal Green 8 Ching Hiu Road, Ng Uk Tsuen, SheungShui, New Territories FSSTL 231 BD 2/9172/05 July 2009

497 2009 Leigh & Orange Ltd Alteration and Addition Works to Concourses East andWest Forecourt at Tai Po Market Station Tai Po Market Station KCR L/8 BD 2-3/7836/96(P) July 2009 (BA14)

498 2009 Aedas Ltd Sai Kung - Proposed Private Residence DD 224, Silverstand, Clearwater Bay, SaiKung Lot No. 369 September 2006

499 2009 P & T Architects & Engineers Ltd Residential Redevelopment at STTL 467, Tai Po Road,Shatin Heights, Shatin

Tai Po Road, Shatin Heights, Shatin, NewTerritories STTL 467 BD 9016/07 July 2009 (OP)

500 2009 Leigh & Orange Ltd Construction of Extension Block to Pui Ling School ofPrecious Blood, Fanling

13 On Lok Mun Street, On Lok Tsuen,Fanling FSSTL 194 BD 2/9170/06(P) 8 July 2009

501 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Deerhill Bay Tai Po TPTL 135 BD 2/9043/94 14 August 1998

502 2009 Lu Tang Lai Architects Ltd The Forest Hill 99 Po Kong Village Road, Kwun Tong,Kowloon NKIL 6272 BD 2/4065/04 19 March 2008

503 2009 Hong Kong Housing Department Redevelopment of Sau Mau Ping Phase 12 DistrictOpen Space 20 Sau Ming Road January 2009

504 2009 CYS Associates (HK) Ltd Vision Court Residential Dev. 286 Prince Edward Road Street KIL 2097 sE, RP BD 2/4187/91 August 2001505 2009 Arthur C.S. Kwok Architects & Associates Ltd Proposed Office Development 100 How Ming Street KTIL 242 BD 2/4030/03 9 September 2008506 2009 MLA Architects (HK) Ltd Proposed Commercial Development 1 Wang Kwong Road NKIL 5925 RP BD 2/4006/06 June 2009507 2009 Wong Tung & Partners Ltd Ocean Shores (Phase 3), Tseung Kwan O Town 88 O King Road, Tseung Kwan O Lot 55 BD 2/9156/97 31 October 2003

508 2009 Hsin Yieh Architects & Engineers Ltd The Dynasty 18 Yeung Uk Road, Tsuen Wan, NewTerritories TWTL 394 BD 9061/98H(P) 22 January 2009

509 2009 Aedas Ltd Ocean Park Redevelopment Funicular Tunnel &Terminals

Ocean Park, 180 Wong Chuk Hang Road,Aberdeen, Hong Kong RBL 1020 RP & Ext BD 2/2032/06(P) 12 June 2009

510 2009 Aedas Ltd North Satellite Concourse Chek Lap Kok, Hong Kong InternationalAirport

Chek Lok Kok Lot No. 1 &Extension BD 9080/06(P) September 2009

511 2009 P & T Architects & Engineers Ltd King's Park Rise King's Park Rise, Kowloon KWL 1063 BD 2/7331/96-3 Pt. III January 2000

512 2009 P & T Architects & Engineers Ltd The Hong Kong Institute of Education, Pak Shek KokSports Centre Tai Po, Shatin TPTL 170 BD 2/9191/98 September 2000

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

513 2009 Aedas Ltd Sunny Bay Station Sunny Bay, Lantau Island

As gazzetted by MTRCL, onreclaimed land between YamO and The Penny Bay onNorth Lantau Island

1 August 2005 (PC)

514 2009 P & T Architects & Engineers Ltd Proposed Commercial Development 77-79, Granville Road, Tsim Sha Tsui,Kowloon KIL 9601 and 10069 Bd 1/4033/96 27 April 2000

515 2009 P & T Architects & Engineers Ltd Lippp Protective Tower 231-235 Gloucester Road, Hong Kong IL 5245 RP, IL 5247 RP, IL5247 RP, IL 5248 RP, IL BD 2/3006/92 25 October 1996 (OP) ;

October 1997 (PC)

516 2009 P & T Architects & Engineers Ltd Far East Exchange Building Redevelopment 8 Wyndham Street, Hong Kong Il 2099 - 2105 BD 2/2016/94 18 July 1997 (OP) ; 3 June1997 (PC)

517 2009 P & T Architects & Engineers Ltd Residential Development at TMTL 371, Siu Lam 9 Tsing Fat Lane, Tuen Mun, NewTerritories TMTL 371 BD 2/9175/99H 30 July 2002 (OP) ; 30

September 2002 (PC)

518 2009 Rocco Design Architects Ltd Redevelopment of Man Yee Building 60-68 Des Voeux Road Central ML 14 BD 1/2065/94 November 1999 (OP) /December 1999 (PC)

519 2009 Cypress Consultant Ltd Residential Development (13 nos. houses) Hang Tau Road, Kwu Tung, Sheung Shui Lot No 2596 BD 2/9068/05 December 2008

520 2009 Wong Tung & Partners Ltd TMTL 374, So Kwun Wat, Tuen Mun TMTL 374, Area 55A, So Kwun Wat, TuenMun TMTL 374 BD 6/9025/97H September 2002

521 2009 P & T Architects & Engineers Ltd Proposed Residential Redevelopment at RBL 821 &Extension, Turtle Cove, Red Hill, Hong Kong RBL 821, Turtle Cove, Red Hill RBL 821 BD 3/3020/92 November 1998

522 2009 K.A. Kho & Associates Architects & Consultants Ltd Student Hostel (300 Places) at Shaw Campus, CUHK The Chinese University of Hong Kong, STTL 437 BD 2/9212/97 April 2001

523 2009 P & T Architects & Engineers Ltd The Construction of A Primary School in Sham Tseng,Tsuen Wan 37 Castle Peak Road, Sham Tseng TW 452 SS S308 - 332 EP May 2009

524 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot Phase 2 1 Tsun King Road, Shatin, STTL 411,New Territories STTL 411 BD 2/9143/90 Pt III March 1997 (OP) ; June

1997 (PC)525 2009 Wong & Ouyang (HK) Ltd Villa Esplanada Proposed Residential Phase 3 8 Nga Ying Chau Street, Tsing Yi TYTL 129 March 2001526 2009 P & T Architects & Engineers Ltd Redevelopment of St. Stephen's Girls' Primary School 33 Park Road, Hong Kong GLA-HK882 March 2009

527 2009 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East

IL47AsARP, IL47AsBRP,IL47AsCRP, IL47ARP,IL47BsCRP, IL47BRP,IL47AsBss2, IL47AsD,IL47BsD, IL47BsBRP,IL47BsARP, IL47CsARP,IL47CsAss1RP, IL47CRP,IL47DRP, IL47DsARP,IL47sBRP, IL47sAss1,IL47sCss1 & ExtensionThereto, IL47sCss2sA,IL47sCss2RP, IL47sCss3sA,IL47sCss3RP, IL47sCss4,IL47sCss5 & ExtensionThereto, IL47sCss6sRP,IL47sCss6sA, IL47sCss7RP,IL47sCRP, IL47sBss1,IL47sARP, IL47sP, IL47RP,IL47sP, IL47RP

BD 3019/01 February 2007

528 2009 Hsin Yieh Architects & Engineers Ltd Hotel Development at KIL 4013 sD & RP, To Kwa Wan Mo Cheong Street, To Kwa Wan, Kowloon KIL 4013 RP BD 2/4068/98/2 1 June 2009

529 2009 LWK & Partners (HK) Ltd Proposed Commercial and Residential Development -Park Central

9 Tong Tak Street, Tseung Kwan O, NewTerritories TKOTL 74 BD 2/9136/97(2) 17 February 2005

530 2009 LWK & Partners (HK) Ltd Commercial Redevelopment at No 23-29 Wing FungStreet

23-29 Wing Fung Street, Wanchai, HongKong Lot No 526 7 April 2006

531 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Floridian, Redevelopment at SIL 817 of Block B,Sai Wan Terrace 18 Sai Wan Terrace, Quarry Bay SIL 817 BD 2/3008/89 September 1997

532 2009 LWK & Partners (HK) Ltd Proposed Residential Development at 11-12 HeadlandRoad, Hong Kong

11-12 Headland Road, South Bay, HongKong RLB 1163 BD 2/2030/06

OP for Block 5: 17 July2009 ; OP for Block 1, 2and 3 is applying andtarget to be issued in

533 2009 Sherman Kung & Associates Architects Ltd Private Residence at Jardine's Lookout 3 Henderson Road, Jardine's Lookout,Wan Chai IL 7332 BD 2/3014/04 7 August 2009

534 2009 AGC Design Ltd Island Lodge 180 Java Road, North Point, Hong Kong IL 7105 BD 2/3022/03 17 December 2008 (OP)

535 2009 Philip Liao & Partners Conversion of the Bethanie into the Second Campus ofthe Hong Kong Academy of Performing Arts 139 Pokfulam Road, Hong Kong GLA-HK975 ASD PB P3-07 January 2009

536 2009 Philip Liao & Partners Garden East Residential Development at 214-224Queen's Road East 214-224 Queen's Road East, Hong Kong IL 427 SG, SD, SS1 & SDRP BD 3086/93 18 July 2008 (OP) ; 14

November 2008 (PC)537 2009 Gravity Partnership Ltd Proposed Hotel Development 2-12 Shelter Street IL 1149 BD 2/3009/97 (Pt. II) 23 November 2000

538 2009 P. Y. Leung & Associates Ltd Proposed Church Building on NKIL 6180 at Fung TakRoad Diamond Hill, Kowloon NKIL 6180 BD 2/4088/95 21 May 1998 (OP) ; June

1998 (PC)

539 2009 Aedas Ltd Residential Development Yau Kam Tau TWTL 367, Yau Kam Tau, Castle PeakRoad / 2A Yau Lai Road, Tsuen Wan TWTL 367 BD 2/9149/04 (Pt. II) 29 June 2009

540 2009 K.A. Kho & Associates Architects & Consultants Ltd Private Residential Development Seung Sz Wan Lot 162 in DD 235 BD 2/9187/99 January 2010 (OP) ;October 2009 (PC)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

541 2009 Ronald Lu & Partners (HK) Ltd The Merton

Site A: Kennedy Town New Praya,Kennedy Town, Hong Kong ; Site B: J/OCandogan Street, Catchick Street andDavis Street, Kennedy Town, Hong Kong

IL 8971BD 2015/99(H) (SiteA) ; BD 2022/99(H)(Site B)

Site A: May 2005 (OP) ;July 2005 (PC) ; Site B:November 2004 (OP) ;January 2005 (PC)

542 2009 Ronald Lu & Partners (HK) Ltd Proposed New Club House For Ladies' Recreation Club 10 Old Peak Road, Hong Kong IL 6375 RP BD 2/2027/01 4 September 2006

543 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Noble Place 10 King Fung Path, Tuen Mun, NewTerritories TMTL 263 1998

544 2009 Gravity Partnership Ltd Proposed Composite Building Redevelopment 125 Wan Chai Road, Hong Kong IL 611 & IL 612 BD 2/3032/98 21 June 2001 (OP) ; June2001 (PC)

545 2009 Wong Tung & Partners Ltd Cyberport Residential Deve Bel-Air R1 Residence Bel-air, Island South, HongKong I.L. 8969 BD 2/2042/99/ST8

2004 (June 17) - Phase 1 ;2004 (December 10) -Phase 2

546 2009 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

HKHS Sandwich Class Housing Development in Area24, Tseung Kwan O

The Pinnacle, 8 Wan Hang Road, TseungKwan O TKOTL 37 BD 2/9237/94 16 September 1998

547 2009 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Development at URA K11 - Hanoi Road Site(KIL 11188), Kowloon K11 Hanoi Road, Tsim Sha Tsui, Kowloon KIL 11188 BD 3/4031/00

548 2009 Architectural Services Department The New Headquarters for the Electrical andMechanical Services Department Kai Cheung Road, Kowloon Bay, Kowloon ASD

52/6977/ID/W79/001 November 2004

549 2009 P & T Architects & Engineers Ltd The Hong Kong Polytechnic University Cultural &Professional Complex

The Hong Kong Polytechnic University,Hung Hom, Kowloon KIL 9853 RP & Ext BD 2/4042/94 August 1999

550 2009 Architectural Services Department New Fanling Magistracy Building Area 11, Pik Fung Road, Fanling (Lot No.DN324) DN 324 ASD 51-1377 March 2002

551 2010 Jason Yuen & Associates Ltd Proposed Multi-storey Shop / Office Building 574-576 Nathan Road, Yaumatei, KIL 2359 SB & RP BD 2/4164/81 14 Jan 1997552 2010 Leigh & Orange Ltd St. Paul's School (Lam Tin) School No: S210 10 On Tin Street, Lam Tin, Kowloon Lot No. 5210 BF 2/3024/01(P) 10 Dec 2004

553 2010 Spence Robinson Ltd St. John the Baptist Church & Care & Attention Homeat Tseung Kwan O, Area 22

Po Lam Road North, Tseung Kwan O,New Territories TKOTL 33 BD 2/9229/98 Jan 2002

554 2010 Ie, Siu & Chung Architects Ltd Proposed Office Development 109-111 Bonham Strand, Hong Kong ML 156 RP & 157 RP BD 2/2082/93 22 Apr 2009

555 2010 Ronald Lu & Partners (HK) Ltd Dormitory and Facility Extension of United ChristianCollege (Kowloon East) 2 Lee On Lane, Kwun Tong, Kowloon NK 610 -- June 2009

556 2010 Leigh & Orange Ltd SIP Phase IV Package 3 - Good Shepherd Primary 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 1/3086/01 (P) 6 Jan 2005

557 2010 Aedas Ltd Residential Development at 31 Grampian Road 31 Grampian Road, Kowloon City,Kowloon NKIL 6332 BD 2/4014/95 30 June 2006 (OP) ; 31

July 2006 (PC)

558 2010 WCWP International Ltd APT Satellite Transmission Telemetry Control andMonitoring Station

Tai Po Industrial Estate, Tai Po, TPTL 13Section E, Sub-station 1 (Phase 1) TPTL13 25 Apr 1994

559 2010 Aedas Ltd Extension to the Church of Jesus Christ of Latter DaySaints at Tseung Kwan O

Tseung Kwan O Lot 45, Area 11, Po LamLane TKOTL 45 BD 6/9106/04 9 Oct 2006

560 2010 Aedas Ltd School Improvement Programme (SIP) Final PhaseS270 - Diocesan Boy's School 131 Argyle Street, Kowloon IL No. 6737 BD 3019/03 (P) 24 June 2005

561 2010 P & T Architects & Engineers Ltd Residential Redevelopment at RBL 809 23 Big Wave Bay Road, Shek O, Hong RBL 809 BD 2041/01 10 Dec 2003

562 2010 WCWP International Ltd SIP Final Phase Package 1, Buddhist Wong Fung LingCollege

11 Eastern Hospital Road, Soo Kun Poo,Hong Kong IL No. 8591 BD 2/3140/01 (P) 30 Dec 2005 (OP) / June

2005 (PC)

563 2010 Aedas Ltd MTRCL Tung Chung Cable Car Ngong Ping ThemeVillage Ngong Ping Road, Lantau Island 238 in DD Ngong Ping BD 2/9905/03 (NPTV)

(P) May 2006

564 2010 Ronald Lu & Partners (HK) Ltd One Silver Sea 18 Hoi Fai Road, Kowloon KIL 11158 BD 2/4011/02 23 June 2006

565 2010 Max Yiu & Associates Proposed Residential Development at Ching Hiu Road,Sheung Shui, New Territories

Ching Hiu Road, Sheung Shui, NewTerritories FSSTL No. 217 BD 9122/04 April 2007

566 2010 LD Asia - Llewelyn-Davies (HK) Ltd Extension works of SNCL Cheung Chuk Shan MemorialSchool Sheung Hung Road, Tokwawan, Kowloon Lot No. 7526 -- May 1999

567 2010 RMJM (HK) Ltd Residential Development at No. 99 Peak Road, HongKong No. 99, 101, 103 Peak Road, Hong Kong RBL No. 1147 BD 2/2039/99 13 Feb 2003 (OP) ; Jan

2003 (PC)

568 2010 WCWP International Ltd Proposed Residential Development at 2 Forfar Road,Kowloon, RP of KIL No 4022 2 Forfar Road, Kowloon RP KIL No. 4022 BD 3/4038/05 28 Jan 2010 (OP) ; Aug

2010 (PC)569 2010 Woods Bagot Asia Ltd The Apex House at the Peak 16 Mount Austin Road, The Peak, Hong RBL 913 & 640 BD 2-3/2256/69/7 12 Dec 2008

570 2010 SIDE Ltd Additional and Alteration Works to Town HealthTechnology Center

10-12 Yuen Shun Circuit, Shatin, NewTerritories STTL 282 BD 2-3/9137/87/3 (D) August 2010

571 2010 Daniel Tong Chartered Architect Proposed Residential Development 217-223 Prince Edward Road West, KIL 11143 BD 2/4050/99 February 2004572 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Kingston Terrace 2 King San Path, Tuen Mun, New TMTL 384 N/A 2 August 2002

573 2010 P & T Architects & Engineers LtdNew Campus For the HK Design Institute andReprovisioning of Institute of Vocational Education LeeWai Lee Campus

Area 74, Chui Ning Road, Tseung KwanO, New Territories TKOTL 107 BD 2/9070/06 (P) 22 Feb 2010

574 2010 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RIVb) Stages 10-12Cyberport Residential Development Telegraph Bay, Pok Fu Lam Section B of IL 8969 BD 2/2042/99/ST 10-

12 (B)29 May 2007 (OP) ; Oct2007 (PC)

575 2010 Cheung Kong Yeung Architects Ltd Proposed Industrial & Ancillary Office Redevelopment On Lok Mun Street, New Territories NoFSSTL 184 FSSTL No. 184 BD 2/9023/08 Before at the end of Nov

2010

576 2010 Leigh & Orange Ltd Redevelopment of Lam Tin Phase 6 On Tin Estate On Tin Estate, On Tin Street KL 29 NR HD (ICU)B02/KL29NR/06 Dec 2004

577 2010 Aedas Ltd The Church of Jesus Christ of Latter-Day SaintsWanchai Chapel

118 Gloucester Road, Wanchai, HongKong IL 8909 BD 2/3028/00 March 2005

578 2010 AGC Design Ltd Island Lodge 180 Java Road, North Point, Hong Kong IL 7105 BD 2/3022/03 17 Dec 2008

579 2010 Aedas Ltd Sai Kung - Proposed Private Residence DD 224, Silverstand, Clearwater Bay, SaiKung, New Territories IL 369 BD 2/9048/04 September 2006

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

580 2010 Wong & Ouyang (HK) Ltd Redevelopment of 35 Deep Water Bay, Hong Kong 35 Deep Water Bay, Hong Kong RBL 536 BD 3/3002/00 June 2003581 2010 P. K. Ng & Associates (HK) Ltd Construction of New Abbot Hall at Wong Tai Sin 2 Chuk Yuen Estate, Wong Tai Sin, NKIL 5282 BD 2-3/4493/69 January 2010

582 2010 LD Asia Redevelopment of Pooi To Middle School 2-8 Inverness Road, Kowlono City,Kowloon NKIL 3737 BD 2/4043/05 February 2009 (OP) ; April

2009 (PC)

583 2010 Sherman Kung & Associates Architects Ltd A&A Cladding Works, External Wall Renovation forHotel New Harbour 41-49 Hennessy Road, Wanchai IL 2823 Sec A BD 2-3/2407/62/4 5 February 2007

584 2010 Hong Kong Housing Authority Tuen Mun Area 52, Phase 3 (Fu Tai Estate) Tuen Mun Area 52 HD (AR) 627 December 2000

585 2010 Tom Ip & Partners Architects, Engineers & DevelopmentConsultants Ltd

Proposed Domestic Building on IL2392 - 2393 at No.11-13 Sand Street, Hong Kong 11-13 Sand Street IL 2392, 2393 BD 2/2055/90 Jan 2001

586 2010 Cypress Consultant Ltd Residential Building at 6 Wiltshire Road, Kowloon Tong 6 Wiltshire Road, Kowloon NKIL 4028 BD 2/4025/05 February 2008

587 2010 Architectural Services Department New Infectious Disease Centre Attached to thePrincess Margaret Hospital

Princess Margaret Hospital Road, KwaiChung

ASD54/6867/MA/H88/M November 2006

588 2010 Hong Kong Housing Authority Tung Tau Cottage Area West 130 Junction Road, Kowloon SST No. KX 2412 April 2010

589 2010 Urbanage International Ltd TWGHs C Y Ma Memorial College 3 Yau Shin Street, Yuen Long, NewTerritories GLA YL 237 BD 2/3007 August 2003

590 2010 Rocco Design Architects Ltd Commercial Tower Redevelopment 8 Queen's Road Central, Hong Kong IL 3274 BD 2/2024/97 1 November 2000 (OP) ;13 November 2000 (PC)

591 2010 Rocco Design Architects Ltd Proposed Dedicated Premises for the School of Hoteland Tourism Management 17 Science Museum Road KIL 10644 BD 4072/05 Anticipated OP Date by

End November 2010592 2010 Steve Leung Architects Office Development at 9 Chong Yip Street, KTIL 444 9 Chong Yip Street, Kwun Tong KTIL 444 March 2004

593 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot Phase 2 1 Tsun King Road, Shatin, STTL 411,New Territories STTL 411 BD 2/9143/90 1997

594 2010 CP Architects Ltd Next Media Printing Workshop RP of Section J ofTKOTL 39

8 Chun Ying Street, Tseung Kwan OIndustrial Estate West, Tseung Kwan O TKOTL 39 s JR P & Ext BD 2/9274/95 9 January 1998

595 2010 David S.K. Au & Associates Ltd Residential Development at 43 Beach Road 43 Beach Road, Repulse Bay RBL 1122 BD 2/2075/05 15 October 2010

596 2010 P & T Architects & Engineers Ltd District Open Space at Po Kong Village Road, WongTai Sin Po Kong Village Road, Wong Tai Sin GLA - NK615 Contract No. SSS315

Section 1: Feb 2010 ;Section 2: Aug 2010(Anticipated) ; Section 3:Aug 2009

597 2010 P & T Architects & Engineers Ltd Joint-user Complex and Wholesale Fish Market in Area44, Tuen Mun

101 Wu Shan Road, Tuen Mun, NewTerritories GLA - TM428 SSR314 September 2010

(Anticipated)

598 2010 P & T Architects & Engineers Ltd Kwai Chung Estate Phase 5 Kwai Chung Estate 5, Tai Wo Hau, KwaiChung, New Territories March 2005 (PC)

599 2010 MDVISTA Ltd GIC Public Carpark and Residential Development atTSWTL No. 24, Area 33, Tin Shui Wai, New Territories

2 Tin Yan Road, Tin Shui Wai, NewTerritories TSWTL 24 BD 2/9061/02 July 2010 (OP) ; Nov 2010

(PC)

600 2010 WCWP International Ltd SIP for St. Clare's Girl's School 50 Mount Davis Road, Hong Kong IL 7388 BD 2/3097/1

24 May 2005 (Annex,Rooftop) ; 21 Dec 2004(Conversion) ; 11 Mar2005 (Conversion)

601 2010 Leigh & Orange Ltd School Improvement Programme Buddhist Tai KwongMiddle School

178 Kam Sham, Tai Po Market, NewTerritories BD 2/3022/01(P) 21 October 2005

602 2010 P & T Architects & Engineers Ltd Student Hall VII Hong Kong University of Science &Technology, Clear Water Bay, Hong Kong Lot No. 846 BD 2/9084/06 6 March 2009 (OP) ; 7

March 2009 (PC)603 2010 Leigh & Orange Ltd Kwun Tong Maryknoll College 100 Tsui Ping Road, Kwun Tong, Kowloon KTIL 683 BD 2/3045/01(P) 24 December 2003604 2010 Wong Tung & Partners Ltd Cyberport Residential R2 Development Cyberport IL 8969 BD 2/2042/99/ST 9 30 June 2005605 2010 Design 2 (HK) Ltd MHAHK Pak Tin Children's Center Cornwall Street, Sham Shui Po, Kowloon GLA-NK705 10 July 2009606 2010 CYS Associates (HK) Ltd Proposed Residential Development 500 Nam Wai, Sai Kung, New Territories Lot No. 999 in DD 214 BD 2/9194/05 5 May 2008

607 2010 Aedas Ltd The Redevelopment of Landmark East - York House The Landmark 5-7 Pedder Street and 12-16 Des Voeux Road Central

IL 3087, ML2A (SEE B RP),ML2, ML2C, ML3, ML7RP,ML 7sA RP, ML7 sAss 3

15 October 2006 (OP) ; 28November 2006 (PC)

608 2010 Wong Tung & Partners Ltd Residential Development at Junction of Cornwall Streetand Tat Chee Avenue (Mount Beacon) 20 Cornwall Street, Kowloon NKIL 6196 BD 4014/02 April 2006

609 2010 Design 2 (HK) Ltd An 18-Classroom Primary School at Tai Pak Tin Street,Kwai Chung, New Territories

99 Tai Pak Tin Street, Kwai Chung, NewTerritories GLA-KT1159 N/A 18 August 2009

610 2010 Leigh & Orange Ltd School Improvement Programme (Phase IV), Package2, Group 13, Maryrose School

11 Renfrew Road, Kowloon Tong,Kowloon 7 July 2005

611 2010 Wong Tung & Partners Ltd Proposed Residential Development 43-45 Beacon HillRoad, Kowloon 43-45 Beacon Hill Road, Kowloon RP NKIL 4763 BD 2/4024/04 May 2008

612 2010 MAP Architecture & Planning Ltd AQUA 33 33 Consort Rise, Hong Kong IL 623 s 33RP & s 34 RP BD 2-3/2130/87/2 Before end of November2010

613 2010 WCWP International Ltd School Improvement Programme Ho Fung College 448 Wo Yi Hop Road, Sheung KwaiChung, New Territories KCTL 202 RP BD 2/3082/01 3 March 2005

614 2010 Aedas Ltd Proposed Residential Development at Good ShepherdStreet, Homantin, Kowloon

Good Shepherd Street, Homantin,Kowloon KIL 11091 BD 4040/97 August 2000

615 2010 MLA Architects (HK) Ltd Composite Development 28 Tai Po Road, Kowloon NKIL 2771 BD 2/4079/07 February 2010

616 2010 P & T Architects & Engineers Ltd The Chinese University of Hong Kong EngineeringBuilding Complex, Phase II Shatin, New Territories STTL 437 BD 3/9230/98 (P) 22 November 2003

617 2010 Urbanage International Ltd TWGHs NKIL 5294, Chang Ming Thien College 300 Nam Cheong Street, Kowloon NKIL 5294 BD 2/3037/02(P) 15 July 2005

618 2010 Architecture Design & Research Group Ltd New Training Centre Annex at Hong Kong Institute ofVocational Educational (Tuen Mun) Campus

18 Tsing Wun Road, Tuen Mun, NewTerritories TMTL 278 BD 3/9022/07 18 June 2010

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

619 2010 Architecture Design & Research Group Ltd Hong Kong University of Science and TechnologyExtension to Existing Academic Building HKUST, Clear Water Bay, Kowloon 846 in DD277 BD 2/9036/07 September 2010

620 2010 Chau Ku & Leung Architects & Engineers Ltd Residential Re-development, 464-474 Castle PeakRoad, Cheung Sha Wan, Kowloon

464-474 Castle Peak Road, Cheung ShaWan, Kowloon

NKILS 117 sARP & sAss1 &1176 RP & sARP & 1175 RP& sB

BD 4031/04 9 November 2007 (OP) ;28 December 2007 (PC)

621 2010 Ronald Lu & Partners (HK) Ltd Design and Construction of Residential TrainingComplex For Juveniles at Tuen Mun

Yeung Tsing Road, Area 31, Tuen Mun,New Territories TM407 ASD 201/6712/SSL

399 August 2006

622 2010 Ronald Lu & Partners (HK) Ltd Revitalization of Peak Tower 128 Peak Road, Hong Kong RBL 1104 April 2006

623 2010 Andrew Lee King Fun & Associates Architects Ltd Metro Regalia 51 Tong Mi Road, Kowloon KIL 4281 sAss1, ss2, ss3 &RP & sBss1 & RP 23 May 2006

624 2010 Aedas Ltd Renovation of Tuen Mun Trend Plaza (South Wing,Phase 1)

2 Tuen Hop Street, Tuen Mun, NewTerritories TMTL 282 BD 2-3/9001/84/9 31 March 2010

625 2010 Aedas Ltd Alterations & Additions to 24/F, 25/F, 26/F and roof ofPrince's Building

Prince's Building, 10 Chater Road,Central, Hong Kong IL 2181 BD 2-3/2567/61/49 September 2007

626 2010 Aedas Ltd Addition and Alteration for Knutsford Hotel at No. 39Kimberley Road, Kowloon 39 Kimberley Road KIL 7466, 7430, 7424, 6843 BD 2-3/4174/79 December 2006

627 2010 Aedas Ltd DHL Central Asia Hub Expansion6 South Perimeter Road, Hong KongInternational Airport, Chek Lap Kok,Lantau Island, New Territories

RP of CLK No. 1 & ExtThereto BD 2/9151/05 August 2007

628 2010 Percy Thomas Architects Ltd ESF New School at Ma On Shan Area 90B, Ma On Shan, New Territories STTL 522 BD 2/9046/01 July 2006

629 2010 Andrew Lee King Fun & Associates Architects Ltd Proposed Residential Building at no. 18-30 BedfordRoad, Tai Kok Tsui, Kowloon

18-30 Bedford Road, Tai Kok Tsui,Kowloon KIL 11157 BD 2/4063/00 January 2008

630 2010 Architecture Design & Research Group Ltd Refurbishment Works for Hong Kong College ofTechnology (Ma On Shan Campus) Yiu On Estate, Ma On Shan, STTL 505 STTL 505 HD(ICU)

E1/019(N)AA(3)-D 13 June 2010

631 2010 Andrew Lee King Fun & Associates Architects Ltd 100 QRC 100 Queen's Road Central, Hong Kong IL 23 RP BD 2/2057/01 15 September 2006

632 2010 Chau Ku & Leung Architects & Engineers Ltd Extensoin to Caritas Harold H W Lee Care andAttention Home

17 Kong Pui Street, Shatin, NewTerritories STTL 312 BD 2/9128/08 (P) 3 September 2010

633 2010 Andrew Lee King Fun & Associates Architects Ltd Proposed Development at Reclamation Street andArran Street

589-601 Reclamation Street, Mongkok,Kowloon Lot No. 11173 BD 2/4020/04 August 2007 (OP)

634 2010 Nelson Chen Architects Ltd Fairview Park Alliance Church Golden Bamboo Road North, Yuen Long,New Territories Lot No. 4756 in DD 104 BD 2/9021/95 NT65 2001 (OP) ; 14

November 2001 (PC)

635 2010 Wilkinson & Cilley Ltd Addition & Alteration Works of The Hong Kong CricketClub Sports Annex 137 Wong Nai chung Gap Road IL 8783 BD 2/3031/05 16 December 2009 (OP) ;

31 December 2009 (PC)

636 2010 Leigh & Orange Ltd Construction of Extension Block to Pui Ling School ofPrecious Blood, Fanling

13 On Lok Mun Street, On Lok Tsuen,Fanling FSSTL 194 BD 2/9170/06 (P) 8 July 2009

637 2010 AHL Design Workshop Ltd Staff Quarter of French International School 165 Blue Pool Road, Happy Valley, HongKong Lot No 8884 BD 2/3004/08 July 2010

638 2010 Oval Partnership Ltd Enclosure for Multi-function Hall, HKAPA 1 Gloucester Road, Wanchai, Hong Kong IL 8587 BD 2-3/1021/82/19 mid-August 2010

639 2010 Ronald Lu & Partners (HK) Ltd Hotel Development At TWIL 5 & Lot 429 in DD 399 inTing Kau, Tsuen Wan, New Territories

353 Castle Peak Road, Tin Kau, TsuenWan TWIL 5 & Lot 429 BD 2/9131/97 October 2006

640 2010 AGC Design Ltd Proposed Composite Building at 188 Fuk Wah Street,Sham Shui Po, Kowloon

181-185 Fuk Wing Street and 188-200AFuk Wah Street, Sham Shui Po, Kowloon NKIL 6425 BD 2/4069/04 November 2008 (OP) ;

March 2009 (PC)

641 2010 Thomas Chow Architects Ltd A Proposed 30-classroom Primary School at DBSSchool Campus 131 Argyle Street, Kowloon KIL 6737 BD 2/4044/00 (P) 9 July 2004 (OP)

642 2010 Hsin Yieh Architects & Engineers Ltd Hotel Development at KIL 11110 Hung Hom Bay 8 Hung Luen Road KIL 11110 BD 2/4046/01 January 2006 (OP) ; June2006 (PC)

643 2010 BC&A Hong Kong Ltd Proposed Residential Development at South Bay Close 5-11 & 13-19 South Bay Close, Hong RBL 820 & RBL 833 BD 2/2006/02 June 2010644 2010 Amasia International Design Group Residential Development at 18 Pokfield Road 18 Pokfield Road Lot No. 8906 BD 2/2055/95 29 September 2000

645 2010 Aedas Ltd Kowloon Hotel Renovation Works 19-21 Nathan Road, Tsim Sha Tsui,Kowloon KIL 10737 BD 2-3/4030/82 Phase 1: 26 June 2006 ;

Phase 2: 31 August 2006646 2010 Aedas Ltd Alteration & Addition to Existing Giant Panda Habitat Ocean Park, Aberdeen, Hong Kong RBL 1020 RP & Ext BD 2/3014/98 (P) June 2007647 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 39 Conduit Road 39 Conduit Road, Hong Kong IL 7898 sA & RP BD 2/2031/02 September 2009

648 2010 A. Lead Architects Ltd Proposed 3 Storeys Shop with 1 Storey Cockloft at 32-34 Argyle Street 32-34 Argyle Street, Mongkok, Kowloon KIL 2855 sA & RP BD 2-4/4110/07 April 2010 (OP) ; April

2010 (PC)

649 2010 Archiplus International (HK) Ltd Proposed Residential Re-development 377 Prince Edward Road KIL 4234 sA BD 2/4003/99 11 March 2004 (OP) ; 9June 2004 (PC)

650 2010 Archiplus International (HK) Ltd Proposed Composite Building 12 & 12A North Street, Kennedy Town IL 8962 BD 2/2004/00 23 October 2003 (OP) ; 27November 2003 (PC)

651 2010 Architecture Design & Research Group Ltd The Lingnan University New Campus Development(Community College) TMTL 376, Tuen Mun BD 2/9016/03(1) 2005

652 2010 T. K. Tsui & Associates Ltd Tai Po Kau, Tai Po, TPTL 180 3987 Tai Po Road, Yuen Chau Tsai TPTL 180 BD 2/9185/05 December 2009653 2010 Aedas Ltd Renovation of Tai Yau Arcade 181 Johnson Road, Wanchai, Hong Kong IL 2808 sA, sB & IL 2809 sA, BD 2-3/1133/80/3 November 2006654 2010 Chau Ku & Leung Architects & Engineers Ltd TWGHs Fong Shu Chuen Social Service Building 6 Po Man Street, Shaukeiwan, Hong Kong SIL 832 August 1999655 2010 Hong Kong Housing Department Eastern Harbour Crossing Site Phase 3 9 Yau Tong Road, Kowloon N/A N/A August 2008656 2010 Aedas Ltd Satellite Earth Station Dai Hei Street at Tai Po Industrial Estate TPTL 13 BD 2/9141/01 (P) January 2004657 2010 Handi Architects Ltd Residential Redevelopment at 35 Mount Kellett Road 35, 37 Mount Kellett Road, Hong Kong RBL 553 BD 2/2008/05 Pt. 11 29 April 2009

658 2010 D. Heung & Associates Architects & Engineers Ltd Proposed Residential Development at 33 Ka Wai ManRoad, Kennedy Town, HKIL 8873

33 Ka Wai Man Road, Kennedy Town,Hong Kong IL 8873 BD 2/2038/97 11 May 2006

659 2010 MCAA Ltd Proposed Composite Building Development 24-28 Tung On Street KIL 2232 SECA, KIL 2232RP & KIL 84 sEss 2 RP BD 1/4068/06 12 February 2010

660 2010 Christopher Leung & Associates Ltd Proposed Residential Redevelopment at 60 Peak Road 60 Peak Road, Hong Kong RBL 310 BD 2/2013/97 30 September 2005

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

661 2010 Christopher Leung & Associates Ltd Residential Development at 40 Peak Road 40 Peak Road RBL 784 BD 2/2037/01 9 January 2004 (OP) ; 9January 2004 (PC)

662 2010 LWK & Partners (HK) Ltd Proposed Residential Development at 20-26 JohnstonRoad, Wanchai, Hong Kong

20-26 Johnston Road, Wanchai, HongKong ML 296 BD 2/3030/05 26 March 2009

663 2010 WMKY Ltd Proposed Residential Development on IL 2132 at 12Boardwood Road, Hong Kong 12 Boardwood Road, Hong Kong IL 2132 sA, sB, sD, sE & sF BD 3/3020/05 8 June 2010 (OP) ; 30

June 2010 (PC)

664 2010 P & T Architects & Engineers Ltd Enterprise Square III 39 Wang Chiu Road, Kowloon Bay, NKIL5877 NKIL 5877 sA & RP BD 4011/01 May 2004

665 2010 Aedas Ltd Chater House, Commercial Development at 11 ChaterRoad, Central 11 Chater Road, Central ML 287 & 288 BD 2/2014/96 20 June 2002

666 2010 Aedas Ltd Tsuen Wan Plaza - Renovation of TWTL 326, TsuenWan

Tsuen Wan Plaza, 4-30 Tai Pa Street,Tsuen Wan, New Territories TWTL 3262 BD 2-3/9113/87/9 October 2006

667 2010 Aedas Ltd SkyPlaza Development - South Office Tower HK International Airport, Chek Lap Kok,Lantau Island, New Territories

CLK Lot 1 & RP & the extthereto BD 2/9062/03(5)(P) 23 May 2007

668 2010 Aedas Ltd SkyPlaza (APM extension) Lot No 1, Hong Kong International Airport,Chek Lap Kok, Lantau Island, New CLK Lot 1 BD 2/9062/03(2) September 2006

669 2010 Ronald Lu & Partners (HK) Ltd Jockey Club Ti-I College Lok King Street, Fo Tan, Shatin, NewTerritories STTL 324 BD 3130/01 4 October 2005

670 2010 Ronald Lu & Partners (HK) Ltd Valais 28 & 33 Kwu Tung Road, Sheung Shui,New Territories

DD 95 Lots 2242 sA, sB, sC,RP & the ext thereto BD 2-3/9040/06 November 2009

671 2010 Ronald Lu & Partners (HK) Ltd Imperial Villas Phase 1 8 Ping Chuk Lane, Ping Shan, Yuen Long,New Territories Lot No 2052 in DD 121 BD 2/9111/01 28 October 2003

672 2010 Hong Kong Housing Authority Aldrich Bay Integrated Services Building 15 Aldrich Bay Road EHX 308 July 2007

673 2010 Simon Kwan Architect & Associates Ltd Anglers' Bay DD 387, Sham Tseng, Tsuen Wan West,New Territories Lot No 214 BD 9022/01 October 2004 (OP) /

December 2004 (PC)

674 2010 Ronald Lu & Partners (HK) Ltd Po Leung Kuk School Improvement Programme -Group 2 (S311)

Po Leung Kuk Wu Chung College, HengOn Estate, Ma On Shan STTL 500 SF September 2005

675 2010 Wong Tung & Partners Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam IL 8969 RP BD 2/2042/99/ST3 14 October 2003 (OP) ;April 2004 (PC)

676 2010 Aedas Ltd Alteration and Addition Works at the Caroline Centre Caroline Centre, 2-38 Yun Ping Road &61-67 Jardine's Crescent, Causeway Bay IL29, IL457, IL461 BD 2-3/3062/88 23 October 2003

677 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Upgrading and change of use of CDW Building at 388Castle Peak Road, Tsuen Wan, New Territories

382-392 Castle Peak Road and 27-37 MeiWan Street, Tsuen Wan, New Territories 1221 sA in DD 453 BD 2-3/9184/78 2004

678 2010 Planning Services International (Asia) Ltd Proposed Residential Development (Villa Sunshine) Castle Peak Road, Yuen Long, NewTerritories 1737 in DD 122 BD 4/9304/96 9 August 2000

679 2010 Integrated Design Associates Ltd Proposed Office Development 33 Cameron Road, Tsim Sha Tsui,Kowloon KIL 8088 BD 2/4050/03 28 October 2009 (OP) ; 24

November 2009 (PC)

680 2010 Integrated Design Associates Ltd Proposed Residential Redevelopment No. 1 & 1E La Salle Road, Kowloon Tong,Kowloon NKIL 2617 BD 2/4040/05 31 March 2009 (OP) ; 31

August 2009 (PC)

681 2010 LWK & Partners (HK) Ltd Proposed Composite Development at 270 Cheung ShaWan Road 270 Cheung Sha Wan Road, Kowloon NKIL 1068 RP BD 2/4013/06 29 November 2010

682 2010 LWK & Partners (HK) LtdProposed Commercial Development at KIL 6022 RP,No. 1-19A Granville Road & No. 100 Nathan Road,Tsim Sha Tsui, Kowloon

100 Nathan Road, Tsim Sha Tsui,Kowloon KIL 6022 RP BD 4021/05 April 2010

683 2010 Urbanage International Ltd TWGHs S C Gaw Memorial College Tsing Sun Street, Town Centre, Tsing Yi GLA-TW182 BD 2/3020/03(P) July 2005684 2010 Associated Architects Ltd The Hotel of Lan Kwai Fong 3 Kau U Fong, Hong Kong IL 8852 BD 2/2040/01 December 2005 (OP)

685 2010 Hsin Yieh Architects & Engineers Ltd International Christian Quality Music Secondary &Primary School

Po Kong Village Road, Diamond Hill,Kowloon NKIL 6358 BD 4040/01 27 August 2004 (OP) ; end

August 2004 (PC)

686 2010 Rocco Design Architects Ltd Redevelopment of 63 Nathan Road, Kowloon 63 Nathan Road, Kowloon KIL 7425 BD 2/4072/04 6 August 2009 (OP) ; 7November 2009 (PC)

687 2010 LWK & Partners (HK) Ltd Residential Development at Gough Hill Path, Hong 3 & 5 Gough Hill Path, The Peak, Hong RBL 1163 17 February 2006

688 2010 Gravity Partnership Ltd Proposed Composite Building Redevelopment 125 Wan Chai Road, Hong Kong IL 611 & IL 662 BD 2/3032/98 21 June 2001 (OP) ; June2001 (PC)

689 2010 K & W Architects Limited A&A works for Godown Extension at Genstar Tower J/O Man Lok Street, Man Yue Street andHung Hom Road HHIL 545 BD 2/4062/98 July 2006

690 2010 LWK & Partners (HK) Ltd Residential Development at 56 Peak Road, Hong Kong 56 Peak Road, Hong Kong RBL 718 BD 2/2014/00 April 2003691 2010 Archiplus International (HK) Ltd Proposed Additions at 82 Peak Road, RBL 742, Hong 82 Peak Road, Hong Kong RBL 742 BD 2/2014/98 June 2001

692 2010 Chung Wah Nan Architects Ltd TWGHs Ko Ho Ning Memorial Primary School SchoolImprovement Programme - Final Phase

Estate School No. 1, Lai Yiu Estate, KwaiChung, New Territories Lai Yiu Estate BD 3009/03(P) May 2005

693 2010 Andrew Lee King Fun & Associates Architects Ltd Casa Bella, Residential Building 117 Caine Road, Central, Hong Kong Lot No. 3026 BD 2/2077/90 12 March 2001

694 2010 Simon Kwan Architect & Associates Ltd Proposed Residential Development at So Kwun Wat onLot TMTL 465 TMTL 465, Tuen Mun TMTL 465 BD 2/9096/05 30 September 2010

695 2010 WMKY Ltd Proposed Commercial Building 256 Hennessy Road, Hong Kong IL 2769 sB BD 3026/04 28 November 2008

696 2010 WCWP International Ltd "Grand Promenade" - Composite Development 38 Tai Hong Street, Sai Wan Ho, HongKong IL 8955 BD 2/3002/01 21 June 2005 (Phase 1a,

1b) ; 19 August 2005

697 2010 WCWP International Ltd School Improvement Programme - Final Phase S319 -Rosaryhill School (Secondary School)

Rosaryhill School, 41B Stubbs Road,Rosary Hill, Wanchai, Hong Kong IL 3550 RP & ext ASD

303/5825/EX/E20/S3 27 September 2005

698 2010 P & T Architects & Engineers Ltd Canadian International School of Hong KongPerforming Arts Complex

36 Nam Long Shan Road, Aberdeen,Hong Kong Aberdeen Inland Lot No. 417 BD 2/2035/04 11 April 2008 (OP) ; 9 May

2008 (PC)

699 2010 Andrew Lee King Fun & Associates Architects Ltd Residential Development of No. 216-224, Tung ChauStreet

216-224, Tung Chau Street, Sham ShuiPo, Kowloon Lot No. 216-224 BD 4023/98 September 2003

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

700 2010 Lu Tang Lai Architects Ltd The Construction of Secondary School Near Choi WanRoad and Jordan Valley, Kwun Tong Choi Wan Road, Kwun Tong 46 New Clear Water Bay

Road ASD SST 304 11 August 2010

701 2010 Leigh & Orange Ltd SIP Phase IV Package 3 - St. Francis Xavier's College 45 Sycamore Street, Tai Kok Tsui, KIL 6421 -- March 2005702 2010 Chung Wah Nan Architects Ltd Caritas Bianchi College of Careers 18 Chui Ling Road, Tseung Kwan O TKOTL 92 BD 2/9110/06 June 2009

703 2010 P & T Architects & Engineers Ltd Residential Development at 51 Fung Shing Street,Ngau Chi Wan, NKIL 6350, Kowloon

51 Fung Shing Street, Ngau Chi Wan,Kowloon NKIL 6350 BD 2/4064/05 September 2010

704 2010 Simon Kwan Architect & Associates Ltd Central District Headquarter and Division Police Station Chung Kong Road, Sheung Wan, Hong HK 629 -- September 2009

705 2010 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed Hotel Development at No. 35-43 Ivy Street,Tai Kok Tsui, Kowloon 88 Tai Kok Tsui Road KIL 8050 BD 2/4055/05 22 February 2010

706 2010 Design Consultants Limited Australian International School Hong Kong Junction of Waterloo Road and NorfolkRoad, Kowloon NKIL 6315 BD 4049/99 (P) August 2001

707 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Lee Garden (Manulife Plaza) J/O 33-37 Hysan Avenue, 7-11 Yun PingRoad, and 20-24 Lan Fong Road

IL 29 sec DD, IL 457 sec L, IL29 MM, IL 29 L RP & IL 457 1998

708 2010 Lu Tang Lai Architects Ltd Crowne Plaza Hong Kong Causeway Bay 8 Leighton Road, Causeway Bay, Hong IL 4369-4377 8 April 2009709 2010 Original Vision Ltd A&A works on Lot No. 236 in DD 229 684 Clearwater Bay Road, Sai Kung Lot No. 236 in DD 229 BD 2-3/9361/92/4 August 2010

710 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tseung Kwan O Public Transport Interchange, HongKong

Tseung Kwan O Town Center, Area 56,TKOTL No. 72 Area 56, TKOTL 72 BD 2/7196/98 28 June 2002

711 2010 Cypress Consultant Ltd HKSKH Holy Spirit Church cum Residential Care Home 13 Yuen Chau Kok Road, Shatin, NewTerritories STTL 518 BD 9084/03 February 2009

712 2010 MLA Architects (HK) Ltd Conduit 18 18 Conduit Road, Hong Kong IL 711 sA BD 2057/05 21 June 2010

713 2010 Aedas Ltd Hong Kong Jockey Club Shatin Race Course ParadeRing Redevelopment Shatin Race Course STTL 13 BD 2/9091/03 November 2004

714 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park, Kowloon KIL 11118 BD 2/4038/00 February 2004 (OP)

715 2010 Archiplus International (HK) Ltd Proposed Residential Development at 26 Mount KellettRoad 26 Mount Kellett Road, Hong Kong RBL 1119 BD 2068/05 August 2009

716 2010 Rocco Design Architects Ltd Salesian Yip Hon Millennium Primary School Shek Lei Estate, Shek Pai Street, KwaiChung GLA-KT 1141

Contract No. SSM312 ; ProgrammeNo.: 306EP

Certificate of Completion:31 July 2005

717 2010 Aedas Ltd Stanley Main Beach Water Sports Centre Stanley Link Road, Stanley, Hong KongASD ref:302/5418/SSH325/M15/520

28 September 2004

718 2010 Three's Architects Ltd New Café Kiosk Entrance Plaza at Kam Kam Road, Tai Po 1822 RP in DD 10 BD 3/9002/06 March 2010 (PC)

719 2010 Arthur C.S. Kwok Architects & Associates Ltd Landmark East 100 How Ming Street, Kwun Tong,Kowloon sA & RP KTIL 242 BD 2/4030/03 9 September 2008 (OP) ;

30 September 2008 (PC)

720 2010 LWK & Partners (HK) Ltd Proposed Residential Development at 117 Repulse BayRoad (Namely Grosvenor Place) 117 Repulse Bay Road, Hong Kong RBL 168 sAss1 BD 2/3092/97 September 2003 (OP)

721 2010 Rocco Design Architects Ltd Hong Kong Station Development - Northern Site HotelDevelopment

Lantau and Airport Railway, Hong KongCentral Station Development, NorthernSite (Hotel), Habour View Street, CentralReclamation

IL 8898 BD 3/7173/93-4(HT) 27 January 2005

722 2010 Rocco Design Architects Ltd Hong Kong School of Creativity 135 Junction Road, Kowloon Lot No. 577ASD55/92050/CWO/003-03/BP

November 2007

723 2010 WCWP International Ltd Hotel at IL 8774, 33 Leighton Road, Causeway Bay,Hong Kong - "Lanson Place Hotel"

133 Leighton Road, Causeway Bay, HongKong IL 8774 BD 2-3/3063/97/2 13 December 2005

724 2010 P & T Architects & Engineers Ltd Proposed Residential Development at RBL 1164, CapeRoad, Chung Hom Kok 33 Cape Road, Chung Hom Kok RBL 1164 BD 2/2013/02 11 January 2005

725 2010 Ronald Lu & Partners (HK) Ltd Choi Hung Park & Ride Development 8 Clear Water Bay Road NKIL 6179 BD 1/7182/95 December 2005 (OP) ;December 2005 (PC)

726 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center Pioneer Center at 750 Nathan Road,Kowloon (Lot No. KIL 2111) KIL 2111

727 2010 Simon Kwan Architect & Associates Ltd Proposed Residential Development at STTL 539 Tai Wai, Shatin, New Territories, STTL STTL 539 BD 2/9015/03 29 June 2009

728 2010 Design Consultants Limited YWCA Begonia Road - Re-development of YWCAMaurine Grantham Centre

66 Begonia Road, Yau Yat Chuen,Kowloon NKIL 6034 BD 4075/98 November 2002

729 2010 RMJM (HK) Ltd School Improvement Program Final Phase - Package 2Canossa School (HK)

8 Hoi Chak Street, Quarry Bay, HongKong IL 8570 BD 3059/02(P) March 2006

730 2010 RMJM (HK) Ltd Proposed Residential Development at NKIL 4016 16-22 Hampshire Road, Kowloon Tong,Kowloon NKIL 4016 February 2002

731 2010 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O GLA ASD302/5586/SSM336/00 March 2009

732 2010 Handi Architects Ltd Proposed Renovation of Lane Crawford House 70 Queen's Road Central, Hong Kong IL 7 RP & IL 45 sA RP BD 2-3/2475/72/10 November 2006

733 2010 DCM Studios Ltd Additional and Alteration Work for Mandarin OrientalHotel 5 Connaught Road, Central, Hong Kong ML 369

BD 2-3/2344/60/27 ;BD 2-3/2344/60/36 ;BD 2-3/2344/60/35

31 January 2007

734 2010 DCM Studios Ltd ESF Clear Water Bay School Extension Off Clearwater Bay Road, Sai Kung, NewTerritories DD 229, Lot 235 BD 2/9045/01(P) April 2005

735 2010 DCM Studios Ltd Redevelopment Works for Retail Flagship Store 5 Canton Road, Ocean Centre, Basementto 4/F of Block A, Tsim Sha Tsui, Kowloon KML 11 sA BD 2-3/4070/72/19 28 February 2008

736 2010 P. Y. Leung & Associates Ltd Church Building on NKIL 6180 At Fung Tak Road Diamond Hill, Kowloon NKIL 6180 BD 2/4088/95 21 May 1998 (OP) ; June1998 (PC)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

737 2010 Nelson Chen Architects Ltd St. Stephen's Society Expansion 50A Kung Kok Shan Road, Shatin STTL 469 BD 2/9076/0626 March 2009 (OP) ; 20March 2009 and 30 April2009 (PC)

738 2010 P & T Architects & Engineers Ltd Proposed Residential Development at 57 Shouson HillRoad, Hong Kong 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD DH337/72/HK 11 April 2003

739 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Phase VII Development, The Hong Kong PolytechnicUniversity Hung Hom, Kowloon KIL 9853 RP and ext BD 2/4004/02 September 2005

740 2010 K.A. Kho & Associates Architects & Consultants Ltd Private Residential Development Sheung Sz Wan Lot 162 DD 235 BD 2/9187/99 expected to be inNovember 2010

741 2010 Wong & Ouyang (HK) Ltd URA Project K2 - Langham Place (Site A) 8 Argyle Street, Kowloon KIL 11099 BD 2/4231/93 July 2004 (OP) ; February2005 (PC)

742 2010 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Commercial / Residential Redevelopment atKML 102, Ma Tau Kok 38 San Ma Tau Street, Kowloon KML 102 RP BD 4006/02(TB) 5 August 2005 (OP) ;

February 2008 (PC)743 2010 Architectural Services Department New Fanling Magistracy Building Area 11, Pik Fung Road, Fanling DN324 ASD 51/1377 March 2002

744 2010 Wong & Ouyang (HK) Ltd Three Pacific Place One Queen's Road East

IL47AsARP, IL47AsBRP,IL47AsCRP, IL47ARP,IL47BsCRP, IL47BRP,IL47AsBss2, IL47AsD,IL47BsD, IL47BsBRP,IL47BsARP, IL47CsARP,IL47CsAss1RP, IL47CRP,IL47DRP, IL47DsARP,IL47sBRP, IL47sAss1,IL47sCss1 & ExtensionThereto, IL47sCss2sA,IL47sCss2RP, IL47sCss3sA,IL47sCss3RP, IL47sCss4,IL47sCss5 & ExtensionThereto, IL47sCss6sRP,IL47sCss6sA, IL47sCss7RP,IL47sCRP, IL47sBss1,IL47sARP, IL47sP, IL47RP,IL47sP, IL47RP

BD 3019/01 February 2007

745 2010 Sun Hung Kai Architects & Engineers Ltd Beacon Lodge 373 Po On Road, Sham Shui Po, Kowloon NKIL 6433 BD 2/4003/04 (Pt. II) August 2008

746 2010 A. Lead Architects Ltd Monmouth Terrace Residential Project 9K Kennedy Road, Hong Kong IL 8435 BD 3013/08Anticipated end of Sept2010 (OP) ; Anticipatedend of Oct 2010 (PC)

747 2010 P & T Architects & Engineers Ltd Residential Development of Branksome Tower II 3 Tregunter Path, Hong Kong IL 8393 BD 2004/98 7 April 2004

748 2011 Ronald Lu & Partners (HK) LtdProposed VTC Training Hotel At 6/F and CCTIResources Centre at M/F, Pokfulam Training CentreComplex

145 Pokfulam Road, Hong Kong AIL 420 BD 2-3/2063/90/3-4 December 2009Responsibilities and Liabilitiesof the Architect when aseparate design consultant is

749 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Manulife Financial Centre 223-231 Wai Yip Street and 39 King YipStreet KTIL 744 BD 2/4047/96 2008 Design Effort for Public

Realm

750 2011 Architectural Services Department A 24-classroom primary school in Area 55, Tuen Mun

Po Leung Kuk Women's Welfare ClubWestern District Fung Lee Pui Yiu PrimarySchool, 11 Kwun Tsing Road, So KwunWat, Tuen Mun, New Territories

GLA No. TM420 ASD51/6348/EA/E20/086 July 2011

How far can quality becompensated when time is ofthe essence

751 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Parc Palais 18 Wylie Road, Kings Park, Kowloon KIL 11118 BD 2/4038/00 February 2004 (OP) Tree Preservation and itschallenges

752 2011 Design Consultants Limited Learning Resources Centre, Hong Kong Institute ofVocational Education (Sha Tin)

IVE (Shatin), 21 Yuen Wo Road, Shatin,New Territories

Remaining Portion of STTL233 BD 2/9148/06 (P) July 2008 How the architect responded

to the physical site

753 2011 Aedas Ltd Ocean Park Redevelopment Waterfront Entry Plazaand Aqua City

Wong Chuk Hang Road, Hong Kong, RBL1020 & Ext RBL 1020 & Ext BD 2/2069/06 December 2010 Fire Engineering Approach

754 2011 Simon Kwan Architect & Associates Ltd Hong Kong Science Park Phase 2-Building 20 Hong Kong Science Park Phase 2-Building 20 at Pak Shek Kok, Tai Po TPTL 182 BD 2/9083/03 (3) (P) 12 May 2011 Sustainability Design

755 2011 Wong & Ouyang (HK) Ltd Langham Place, Site B 555 Shanghai Street KIL 11099 BD2/4231/93 17 February 2004The successful negotiationbetween the Architect, URAand the Client

756 2011 WCWP International Ltd Seymour 9A-H Seymour Road and 5, 6, 6A, 7 and7A Ying Fai Terrace, Hong Kong

IL 585 RP and Ils 4626, 4627,4628 and 4629 BD 2/2090/06 12 August 2011 Maximum Development

Potential vs Public Interest

757 2011 Design 2 (HK) Ltd FSD Diving Training Centre in Government Dockyard atStonecutters Island

Government Dockyard at StonecuttersIsland TK 367

ASD55/92050/CWO/023-06/BP

May 2009Cost Saving Exercise in viewof the tender prices exceedingthe approved budget

758 2011 Wong Tung & Partners Ltd "The Latitude" Residential and CommercialDevelopment 638 Prince Edward Road East, Kowloon NIL 6308 BD 2/4070/04 27 September 2010 How to handle client's late

instruction

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

759 2011 WMKY Ltd Proposed Residential Building on RBL 422 andExtensions at No. 120 Pokfulam Road 120 Pokfulam Road RBL 422 BD 2/2045/94 30 February 2007 (OP) ;

11 Jan 2007 (PC)

The case study will extensiveintroduce Home AutomationSystem, and explain how itsapplication can achieveprivacy, security, comfort,improved convenience,energy saving conceptthrough the integration witharchitectural design andlayout, in both active and

760 2011 Ma & Fong & Associates Ltd Proposed Residential Redevelopment at 62 KennedyRoad, Hong Kong 62 Kennedy Road, Hong Kong IL 2299 sARP BD 2/3065/02 30 June 2010

Small site, OZP and LeaseRestriction Effect onDevelopment, andNegotiation with GovernmentDepartment to bring aboutadvantegous Results

761 2011 Ivanho Architect Ltd Renovation of the Old Clubhouse at the Beas RiverCountry Club

Beas River Country Club, Kam Tsin Road,Sheung Shui, New Territories Lot No. 922 in DD 94 BD 2-3/9011/97 May 2009 Meeting deadlines for the

olympics

762 2011 Ronald Lu & Partners (HK) Ltd HKYWCA Conference Centre and Guesthouse San Shek Wan, Lantau Lot No. 727 in DD 332 BD 2/9020/04 August 2007 Mitigation measures to poorperforming contractor

763 2011 Chau Lam Architects & Associates Phase II Development of Lily Court 3-7 Mosque Junction, Mid-Levels, HongKong

IL 717 sDIL 392 sA ss3RP, IL392 sARP, IL 717 RP BD 2/2046/01 31 March 2004 (OP)

Changing of site classificationfrom different easement ofservice lane

764 2011 Benoy Ltd Alteration and Addition Works at Hong KongInternational Airport Chek Lap Kok CLK Lot No 1 RP and the ext

thereto

BD 2-3/9702/94/136,137, 138, 142, 143,150, 151

March 2010 Statutory constrains toexisting building

765 2011 Leigh & Orange Ltd Lo Wu Station Improvement Departure Hau QueuingArea and Associated Works Lo Wu Station, New Territories KCRCL 12 BD 22-3/7987/05 (P) December 2007

The Architect's role andresponsibility in respond tocontractor's poor performanceand the challenge in theenforceability of liquidateddamages

766 2011 Hong Kong Housing Department Redevelopment of Shek Lei Estate Phase 10 Cnr. Of Wai Kek and Shek Pai Street,Shek Lei, New Territories VO/10/034 HD(AR)/10/R10 30 April 2007 (OP)

Deletion of podium carpark atlate stage of design leading tovariation in piling contract.

767 2011 David S.K. Au & Associates Ltd Extension and renovation works for Eu Yang Sang (HK)Limited Yuen Long Industrial Estate Lot No. 313, Subsection No.

2 of Section H BD 2/9039/05 June 2006 (OP) Effective communication asan aid of construction delivery

768 2011 Architectural Services Department A 30-classroom primary school in Area 55, Tuen Mun So Kwun Wat Road, Area 55, Tuen Mun GLA No. TM420 ASD51/6472J/EA/E20/080 August 2011 Progress/Programme Time

Management

769 2011 WCWP International Ltd Proposed Residential Development at 2 Forfar Road,Kowloon, RP of KIL No 4022 2 Forfar Road, Kowloon RP of KIL 4022 BD 3/4038/05

28 January 2010 (OP) ;August 2010 (AnticipatedPC)

Building height restriction andsolution

770 2011 Architectural Services Department Firestation cum ambulance depot and police post atPenny's Bay Lantau

Long Yan Road, Penny's Bay, NorthLantau Site No. 88/1, GLA No. IS436 ASD 51/5434F September 2004

Architect's endeavour inachieving a plantinum beamplus building

771 2011 LWK & Partners (HK) Ltd Proposed Composite Development at Sham MongRoad, New Kowloon Sham Mong Road, New Kowloon KIL 6338 BD 2/4033/00 December 2003 Non-standard Tendering

Process

772 2011 David S.K. Au & Associates Ltd Maxims' New Food Factory Development 2 Dai Li Street, Tai Po Industrial Estate,Tai Po, New Territories

TPTL no. 1 and ext theretosBss 1 BD 2/9146/09 August 2011

How the architect used hisdesign to overcome siteconstrains?

773 2011 Architectural Services Department Sun Yat Sen Memorial Park Swimming Pool (Section 5of Sun Yat Sen Memorial Park and Swimming Pool Connaught Road West, Hong Kong GLA - HK897 ASD 52/5966 March 2011 (PC) Natural ventilation design in

swimming pool venue

774 2011 Leigh & Orange Ltd Maryknoll Secondary School 45 Choi Ha Road, Ngau Tau Kok,Kowloon NKIL 4495 BD 2/3044/02 (P) 15 March 2005 Site Constraint - Building on

an existing slope

775 2011 Hong Kong Housing Authority Public Rental Housing Development at Choi Wan Road(Site 2 Phase 2) Choi Wan Road, Kwun Tong N/A 30 May 2011 Overcome site constraints at

design and construction

776 2011 L. Y. Wong Associates Ltd Additions and Alteration Works for Conversion ofCommercial Building to Hotel Nos. 21, 21A, 23, 23A Prat Avenue KIL 9361, 8183, 9262 and

9263 BD 2-3/4020/86/3 November 2008

Architect's solution ofminimizing disturbances to anexisting tenant still operatingfor karaoke business at thecaptioned building throughoutthe entire construction stage

777 2011 Tom Ip & Partners Architects, Engineers & DevelopmentConsultants Ltd

Second Primary School - Site 10 West KowloonReclamation Area, HK 1 and 3 Hoi Lai Street, Sham Shui Po GN 706 ASD

102/6804/EA/9AM19 July 2006 (OP) Creation of favorable learningenvironment

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

778 2011 Aedas Ltd Cheung Fat Shopping CentreCheung Fat Shopping Centre, Cheung FatEstate, Tam Kon Shan Road, Tsing Yi,New Territories

TYTL 172 BD 22-3/9190/06 12 July 2008

1. How the Architect dealswith existing issues ofinadequate escape staircaseand direct travel distance tomake the new designcomplied with all statutoryrequirements. 2. Constructionphasing plan would bediscussed with carefulconsideration of renovation

779 2011 P & T Architects & Engineers Ltd Proposed Residential Development No. 57 Shouson Hill Road, Hong Kong Section A of RBL 365 BD 6/3016/97 (L/M) 11 April 2003 Land matters

780 2011 Wong & Ouyang (HK) Ltd Proposed Primary School on IL 8347 RP and AdjoiningGovernment Land at Greig Road

1100 King's Road, Quarry Bay, HongKong

IL 8397 RP and AdjoiningLots BD 2/3065/93 24 June 2002 (OP) ; 8 July

2002 (PC)

How Architect to deal with siteconstraints during designprocess

781 2011 Tam & Philip So & Associates Ltd Alteration and Addition Works: Good Hope School 303 Clear Water Bay Road, Kowloon NKIL 3810 and NKIL 4192 BD 2/3150/01 (P) 9 August 2005 Design opportunity andconstraint

782 2011 SLHO & Associates Ltd 2C and 2D San Lau Street, Kowloon 2C and 2D San Lau Street, Kowloon KILs 7584 and 4307 BD 2/4163/93 January 2004The effect of changes inbuilding control on greenbuilding design and the

783 2011 Ronald Lu & Partners (HK) Ltd Hong Chi Pinehill No. 2 School Pinehill Village, Chung Nga Road, NamHang, Tai Po, New Territories TPTL 34 BD 2/3101/01 (P) 21 April 2005 Delay due to unforeseen site

conditions

784 2011 Ronald Lu & Partners (HK) Ltd A 30-classroom primary school at development nearChoi Wan Road and Jordan Valley, Kwun Tong

78 Choi Wan Road, Jordan Valley,Kowloon GLA - NK771

ASD55/92050/CWO/003-09/BP

August 2011 (Anticipated)Dealing with ambiguility anddiscrepacy in contractdocuments and drawings

785 2011 Ronald Lu & Partners (HK) Ltd Larvotto Ap Lei Chau Praya Road IL 129 BD 2-3/2038/99H 7 December 2010 (OP) ;31 March 2011 (PC)

Industrial/Residential interfaceproblems

786 2011 Ronald Lu & Partners (HK) Ltd Residential Development at Lot No. 1739, DD 122 DD 122 Castle Peak Road, Ping Shan,Yuen Long, New Territories IL 1739 BD2/9075/01 23 December 2005 (OP) ;

May 2006 (PC)

Contract administration withthe main contractor being thesubsidiary company of the

787 2011 Aedas Ltd Alteration and Addition Work of Tsuen Wan Plaza Tsuen Wan Town Lot No. 326 TWTL 326 BD 2-3/9113/87/12 April 2009 Phasing programme

788 2011 P & T Architects & Engineers Ltd Branksome Tower II 3 Tregunter Path, Mid-Levels, Hong Kong IL 8393 BD 2004/98 April 2004 (OP) ; August2004 (PC)

EVA Design not complyingwith regulations

789 2011 AGC Design Ltd Tung Chung Station Development Package One Tung Chung Town Lot 2 TCTL 2 BD 4/7302/94 (P) Pt.II 21 November 2005

Coordination works at thecore interfacing betweenphase 1 and 2

790 2011 David S.K. Au & Associates Ltd Proposed New Sing Tao Newspaper Printing Factory 7 Chun Cheong Street, Tseung Kwan OIndustrial Estate, New Territories TKOTL 39, ss 1, sH and ext BD 2/9252/96 P 22 January 2008 (OP) ; 23

January 2008 (PC)

How Architect to facilitateproject completion andprogramme within 9-monthperiod for foundation works,pile cap and superstructure

791 2011 Hong Kong Housing Department Redevelopment of Upper Ngau Tau Kok Estate -Phases 2 and 3

Ngau Tau Kok Road, Kwun Tong,Kowloon HD (ICU) B1

2/KL33RR/02&03 February 2009 Community participation

792 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Terrace, 933 King's Road, North Point, HongKong

913-919, and 929-935 King's Road, NorthPoint, Hong Kong

QBML 4 sCss 1RP, QBML4sCss 1sB, QBML 4sCss1sARP, QBML 4sCss 1sAss1 and SE

BD 2/3008/99 H August 2002 (OP)

JPN was firstly introducedduring the tower construction.Late design changes toincorporate the new codeswere advised. Detail study onhow architect to draft with thelate design change based onthe new code requirementand how the building wasshaped differently.

793 2011 Wong Tung & Partners Ltd Les Saisons Tai On Street, Shau Kei Wan SIL 843 BD 2/3042/98 31 October 2001

Evaluate the designconsideration between anurban podium high-riseresidential project and a rurallow density house project

794 2011 MLA Architects (HK) Ltd Proposed Residential Redevelopment 24-32 Ming Yuen Western Street, NorthPoint, Hong Kong

IL 897 sBss 1 SA, SBss 5SA, SBss 5 RP, SBss 8 RP,SBss 8 SA, SBss 9

BD 2/3005/06 2 February 2011Impact on the Building Designdue to enactment of newregulations

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

795 2011 MDVISTA Ltd GIC/Public Carpark and Residential Development atTSWTL No. 24, Area 33, Tin Shui Wai, New Territories

2 Tin Yan Road, Tin Shui Wai , NewTerritories TSWTL 24 BD 2/9061/02 July 2010 (OP) ;

November 210 (PC)

The project was the secondphase of the wholedevelopment. The architecthad to design and co-ordinatethe construction of a newpodium to attach the existingone. Concerns on aestheticuniformity and structuralstability between two phases,safety and security measuresfor existing occupants wouldbe studied in the special topic.

796 2011 P & T Architects & Engineers Ltd The construction of a special school for SeverelyMentally Handicapped Children in Area 32, Tin Shui

17 Tin Tan Street, Tin Shui Wai, YuenLong, New Territories TSWTL 32 22 May 2007 Universal Accessibility

797 2011 Architectural Services Department Conversion of Yau Ma Tei Theatre and Red BrickBuilding into a Xiqu Activity Centre

8 Waterloo Road, Yau Ma Tei, Kowloon,334 Shanghai Street, Yau Ma Tei,Kowloon

TK450, KIL11100 ASD52/6811/YMTT/HAB July 2011 (Anticipated)

How Architect struggles withheritage conservation andspatial constraints to cater fornew uses in existing buildings

798 2011 Architectural Services Department Ping Shan Tin Shui Wai Leisure and Cultural Building The Junction of Tin Fuk Road and PingHa Road, Tin Shui Wai, New Territories GLA - TSW 82 ASD 54/3333 May 2011 (PC)

Place for public entertainmentand non place for publicentertainment at the samebuilding

799 2011 Hong Kong Housing Authority Public Rental Housing Redevelopment at Upper WongTai Sin Estate Phase 3

Wing Sin House, Upper Wong Tai SinPhase 3, Wong Tai Sin Road, Wong TaiSin, Kowloon

Vesting Order No. 51

17 September 2009(Domestic block andfootbridge no. 2) and 18December 2009(Footbridge no. 1)

Passive sustainability design

800 2011 Leigh & Orange Ltd Franciscan Centre Redevelopment 133 Waterloo Road, Kowloon NKIL 800 BD 2/4041/00 5 February 2003 Late Final Account

801 2011 P & T Architects & Engineers Ltd Proposed Residential Redevelopment at RBL 1142South Bay Road, Hong Kong

Adjoining No. 14 South Bay Road,Repulse Bay, Hong Kong (Now named as16A South Bay Road)

RBL 1142 BD 2/3036/99 30 December 2002 (OP) ;7 May 2003 (PC)

How the Architect plays herrole to improve thedevelopment potential, inconsideration of statutory and

802 2011 Aedas Ltd Proposed New Chapel in Tseung Kwan O Town Lot No. 45 in Area 11, Tseung KwanO, New Territories TKOTL 45 BD 9291/96 March 2000 Special terms of lease

conditions803 2011 Leigh & Orange Ltd HKFYG Headquarters Redevelopment Project 55 Model Lane, North Point, Hong Kong IL 8960, IL 8990 BD 1/3035/01 7 December 2007 Auditorium

804 2011 Wong & Ouyang (HK) Ltd One Island East Office Development 18 Westland Road, Quarry Bay, HongKong

QBIL 15 sD, QBML 1sCss5sCss6, QBML 2sG & ext, sF& ext, sF & ext, sHss6, sBRP& ext, sHRP & ext and QBML2RP & ext

BD 2/3031/01 17 March 2008

Architect's initiative to achievedesign excellence withconstraints from clients andpractical issues

805 2011 DesignVision Architects Ltd Proposed redevelopment for China Graduate School ofTheology

12 Dorset Crescent, Kowloon Tong,Kowloon NKIL 922 & 923 BD 4062/05 8 May 2008 (OP) ; 20

October 2008 (PC)

How did the Architect dealwith the technical andcontractual issues in order tomanipulate the historicalporch revitalisation to thesatisfaction of the Client and

806 2011 Wong & Ouyang (HK) Ltd One Kowloon 1 Wang Yuen Street, Kowloon Bay NKIL 6268 BD 4024/00 21 March 2007 (OP) ; 12April 2007 (PC)

An in-depth study onrearrangement of office coreduring construction period

807 2011 Aedas Ltd The Church of Jesus Christ of Latter-Day Saints,Wanchai, Chapel

118 Gloucester Road, Wanchai, HongKong IL 8909 BD 2/3028/00 March 2005 Architectural Feature - Church

steeple and roof system

808 2011 P & T Architects & Engineers Ltd Redevelopment of Industrial Building Kiu Tau Wai, Ping Shan, Yuen Long, NewTerritories Lot No. 432 in DD 127 BD 2/9122/07 (Pt II) February 2011 Project Programme and

Budget

809 2011 Wong Tung & Partners Ltd Residential Development at Hung Shui Kiu, Yuen Long,New Territories 88 Hung Yuen Road Lot No 4331 in DD 124 BD 9138/04 21 March 2011 How architect responded to

site constraints?

810 2011 ARK Associates Ltd 22 Cape Road, Chung Hum Kok, Hong Kong 20, 22, 24, 26 Cape Road, Chung HumKok, Hong Kong RBL 800 BD 2/2067/07 26 March 2010

The affect of the client'srequest for early OP mid-construction, on procurementof contract and coordination

811 2011 Leigh & Orange Ltd Hong Kong Baptist University School of Continuing Edu 8 On Muk Street, Shek Mun STTL 540, Area 11 BD 4/9107/03 (P) July 2006 Flexibility of an Architect

812 2011 Leigh & Orange Ltd School Improvement Programme Phase IV Package 2 -Holy Carpenter Prevocational School 10 Tai Wan Road, Hung Hom HHIL 544 BD 3010/02 (P) October 2004 Authorized Person Vs

Buildings Department

813 2011 Wong Tung & Partners Ltd Two Primary Schools at Eastern Harbour Crossing(EHC) Site, Yau Tong

23-25 Yau Tong Road, Yau Tong,Kowloon SS M311 August 2005

The differences betweenGovernment and privateprojects in the whole building

814 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Residential and Commercial Development atTseung Kwan O, Area 55B, TKOTL 75 9 Tong Chung Street, Tseung Kwan O TKOTL 75 BD 2/7227/02 17 January 2006

The Design Coordination andProject Management for SiteDesignated as ScheduledArea No. 3

815 2011 Wong & Ouyang (HK) Ltd Kowloon Station Development Packages 5, 6 & 7-Tower 20 1 Austin Road West, Kowloon KIL 11080 BD 2/7219/00 (F) August 2007 (OP) ;

August 2008 (PC)Architect's design to resolveintricate spatial arrangement

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

816 2011 Wong & Ouyang (HK) Ltd Main Clinical Block and Trauma Centre, Prince ofWales Hospital

30-32 Ngan Shing Street, Shatin, NewTerritories N/A ASD in form no: 6367 23 April 2010

Architect's initiative to achievedesign excellence incontractor-led design and

817 2011 Cheung Kong Yeung Architects Ltd Proposed residential redevelopment at Lot 868 of DD 1,Nga Kau Wan, Lamma Island, Hong Kong Nga Kau Wan, Lamma Island, Hong Kong Lot 868 of DD 1 BD 2/9321/97

23 February 2007 (Phase1) ; 24 November 2008(Phase 2) ; 24 December2008 (Phase 3)

Architect's strategy onfulfilling lease condition andovercoming site constraints

818 2011 Andrew Lee King Fun & Associates Architects Ltd Emerald Green Ma Tin Road YLTL 515 BD 2/9088/05 30 October 2010 Design constraint due to tightsite condition

819 2011 Ronald Lu & Partners (HK) Ltd Ocean View Po Tai Street No. 1, Ma On Shan, Shatin Lot No. 481 BD 3/9135/00 September 2003 JPN Clause No. 1

820 2011 Aedas Ltd A&A to Airport Passenger Terminal Building - East HallExtensions

Passenger Terminal Building - East HallExtension, International Airport, Lot No. 1,Chek Lap Kok, Lantau

Chek Lap Kok Lot No. 1 BD 2/9810/01 (P) December 2003 Fire engineering approach tofire safety

821 2011 AND Architect & Design Ltd Proposed Residential Redevelopment Lots 2598 Lot 2598, Kam Tsin Tsuen, Sheung Shui,New Territories Lot 2598 in DD 92 BD 2/9091/06 June 2007

Unexpected water table levelafter ground investigationresulting change in designand submission strategy

822 2011 Lu Tang Lai Architects Ltd Proposed Residential Development in Area 36, SheungShui

No. 18 Ching Hiu Road, Ng Uk Tsuen,Area 36, Sheung Shui, New Territories FSSTL 189 BD 9138/97H August 2006 Landuse Rezoning

823 2011 LWK & Partners (HK) Ltd The Long Beach 8 Hoi Fai Road, Kowloon KIL 11152 BD 2/4061/00 9 September 2004 (OP) Architect's role vsprocurement method

824 2011 Cheung Kong Yeung Architects Ltd Proposed Residential Redevelopment 11 Verbena Road, Kowloon Tong NKIL 4610 BD 4062/07 3 August 2009 Contract comparison

825 2011 Wong Tung & Partners Ltd Podium Portion (Phase 1) of Tseung Kwan O Area 56Development 9 Tong Yin Street TKOTL 72 BD 2/7196/98 (2) January 2011

How architect countered tosite constraints through earlyidentification and coordination

826 2011 Wong Tung & Partners Ltd Hong Kong Movie City, Tseung Kwan O Tseung Kwan O Area 106, Sai Kung, NewTerritories TKOTL 85 BD 2/9156/01 March 2005 Acoustic Design Issue

827 2011 Wong & Ouyang (HK) Ltd (A&A Works) Proposed Restaurant at Level 4 of PacificPlace

L4, Pacific Place 1, 88 Queensway, HongKong IL 8571 BD 2-3/2013/85/4-5 September 2008 (OP) ;

August 2008 (PC)ETFE Cushion Skylight, FireEngineering, Structural

828 2011 Archiplus International (HK) LtdLime Habitat - Proposed residential redevelopment onIL 897 sAss 19, sAss 20 sA and SBRP at No. 38 MingYuen Western Street, Hong Kong

38 Ming Yuen Western Street, North Point IL 897 sAss 19, sAss 20 sAand SBRP BD 2/3017/07 31 May 2011 (OP) ; 31

August 2011 (PC) Special site circumstances

829 2011 Cheung Kong Yeung Architects Ltd Proposed Development of New Student Dormitory at St.Stephen's College, RBL 432 RP and ext

St. Stephen's College, 22 Tung Tau WanRoad, Stanley, Hong Kong RBL 432 RP and ext BD 2/2027/09 June 2011 Time and cost control

thoughout the project

830 2011 WMKY Ltd Shiu Fai Terrace 6 Shiu Fai Terrace, Hong Kong sub section 1 of section B ofIL 2302 and ext BD 2/3032/06 January 2010 (OP)

The pros and cons of the useof pre-cast façade in aresidential development.

831 2011 Chows Architects Ltd Extension to SKH Mung Yan Primary School at KingFung Path, Tuen Mun, New Territories

King Fung Path, Tuen Mun, NewTerritories GLA - TM 110 ASD

102/7093/EA/E20/001 April 2010How architects deal withlimited site area on designand construction aspects?

832 2011 Aedas Ltd Extension of St. Paul's Co-Education College 33 MacDonnell Road, Hong Kong IL 8203 BD 2033/05 Aug 2011How architect endeavour topromote architecturalexcellence in his work in a

833 2011 I Architects Ltd 1 Silverstrand Beach Road 1 Silverstrand Beach Road, Clear WaterBay Lot No 315 in DD 224 BD 2/9034/06 23 September 2008 Tendering arrangement

comparison Study

834 2011 Original Vision Ltd White Haze 64 Sheung Sze Wan Road Lot No 216 in DD 235 BD 9036/04 23 December 2009 Design and constructionissues of precast concrete

835 2011 TFP Farrells Ltd MTR 710 Re-Provisioning of Kennedy Town SwimmingPool (Phase 1)

2 Sai Cheung Street North, KennedyTown GLA HK 1075

ASD14/85750/TAS/SJP/127

May 2011

Further discuss on statutorycompliance issues andprocedures of project with anwithout BD submission ; therole of ICC in this project; andthe relationship between thearchitect, the client, LCSDand ArchSD.

836 2011 Aedas Ltd Addition and Alteration Works at Hau Tak ShoppingCentre (Phase 3)

East Wing and West Wing, Hau TakShopping Centre, Hau Tak Estate,Tseung Kwan O, New Territories

TKOTL 99 HD(ICU)E3/026(N)AA(5)-D July 2011 Complexity of Construction

Programme

837 2011 Wong Tung & Partners Ltd Six Towers and Hotel Development at Tseung Kwan OLot 72, Area 56 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) Mid August 2011 Design of the typical floor plan

response to the site context.

838 2011 Architectural Services Department Reprovisioning of Diamond Hill Crematorium Po Kong Village Road, Kowloon GLA NK 665 ASD 5989 February 2009 Special comforting design forthe Crematorium

839 2011 Tom Ip & Partners Architects, Engineers & DevelopmentConsultants Ltd

The Construction of a 24-Classroom Primary School atJ/O Texaco Road and Castle Peak Road, Tsuen Wan

J/O Texaco Road and Castle Peak Road,Tsuen Wan, New Territories GLA TW 460 ASD

103/6647/EA/9AN020 December 2008

Investigation of EnvironmentalSustainability of Buildingwithin The Local Context andSite Constraint

840 2011 Wong Tung & Partners Ltd The Hong Kong Polytechnic University, Phase VIDevelopment, Kowloon Inlet

Lee Ka Shing Tower, The Hong KongPolytechnic University, Hung Hom,Kowloon

KIL 9853 RP and ext BD 4017/97 (P)

September 2000 (OP) ;October 2000 (PC-Phase1) ; August 2001 (PC-Phase 2)

How Architect responds toproblems through the crucialconstruction stages to meetcritical deadlines.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

841 2011 Ronald Lu & Partners (HK) Ltd Construction of Swimming Pool Complex in Area 2,Tung Chung

5 Tat Chung Road, Tung Chung, NewTerritories

GLA IS 440 (Phase 1) ;TGLA TIS 560 (Phase 2)

ASD302/6536/RA/9AQ017 November 2011 (PC) An unique feature: The

Membrane roof

842 2011 Ronald Lu & Partners (HK) Ltd The Giverny Man Kei To, Pak Sha Wan, Sai Kung,New Territories Lot No. 1184 in DD 217 BD 9121/01 23 April 2005 (OP) ; 24

May 2005 (PC)

Determination clause in letterof intent as Architect'ssolution to minimize client'sloss due to late approval oftree removal application

843 2011 Aedas Ltd Proposed HKIEd Jockey Club Primary School 10 Lo Ping Road, The Hong Kong Instituteof Education, Tai Po, New Territories TPTL 147 BD 2/9150/00 (P) August 2002

How the Architect justify thedesign against building heightrestriction of schools

844 2011 Wong Tung & Partners Ltd Enterprise Square 5 - Phase II 38 Wan Chiu Road, Kowloon Bay NKIL 5927 BD 2/4042/02 April 2007 (OP) ; May2007 (PC) New Practice Notes Studies

845 2011 Wong Tung & Partners Ltd Commercial / Service Apartment at Yeung Uk Road 138 Yeung Uk Road, Tsuen Wan, NewTerritories TWTL 406 BD 2/9046/93 August 2005 (OP) ;

October 2005 (PC)

Architect's solution toenvironmental concerns in anindustrialised area

846 2011 MCAA Ltd Proposed Composite Building Development 24-28 Tung On Street KIL 2232 SEC A, KIL 2232RP & KML 84 sEss 2 RP BD 1/4068/06 12 February 2010 Asbestos

847 2011 Architecture Design & Research Group Ltd The Hong Kong Community College Development J/O Hung Lai Road and Hung Lok Road,Hung Hom KIL 11163 BD 3/4026/04 Mid June 2007 (OP) ; 10

July 2007 (PC)

Relationship between Buildingdesign and constructiontechnologies - Pros and Cons

848 2011 Wong & Ouyang (HK) Ltd Redevelopment of Au Shue Hung Health Centre, HongKong Baptist University

330 Junction Road, Kowloon Tong,Kowloon NKIL 5907 BD 2/4048/03 20 March 2008

The ways to deal with theenvironmental problemsaffecting the occupants of theadjacent buildings during thedemolition and constructionprocess.

849 2011 Leigh & Orange Ltd Creative Media Centre, City University of Hong Kong 18 Tat Hong Avenue Lot No 6264 BD 2/4011/04 (P) November 2010Codes with implications andcontrol in planning and designaspect

850 2011 AGC Design Ltd Proposed Alterations and Additions Windsor House 311 Gloucester Road, Causeway Bay,Hong Kong

Lot No IL 7717, IL 7718, IL781 sA, IL782 sA & sC BD 2-3/3082/76/33 24 June 2011 Coordination 3 nos. contractor

in different contact at same

851 2011 ARK Associates Ltd The Java, 98 Java Road, North Point 98 Java Road, North Point IL 3539 BD 2/3010/07 1 October 2011

An Investigation on theprecaution and safety ofbuilding constructionespecially in relation to

852 2011 Leigh & Orange Ltd School Improvement Programme - P260 (sp) - SaviourLutheran School 288 Tai Po Road, Kowloon, NKIL 4456 NKIL 4456 BD 3004/02 (P) 2004 Site constraint

853 2011 Llewelyn-Davies (HK) Ltd ASD School Improvement Programme Final PhaseS351 The Pentecostal Holiness Church Wing Kwong 155 Lung Cheung Road, Wang Tau Hom NKIL 5239 BD 2/3002/03 (P) 20 June 2005 How Architect resolve the salt

contaminated building works

854 2011 LWK & Partners (HK) Ltd Bedford Road/ Larch Street Project 38 Larch Street, Tai Kok Tsui, Kowloon KIL 11182 March 2009From URA to BEAM, GreenPremises to UrbanRedevelopment

855 2011 LWK & Partners (HK) Ltd Proposed domestic building in RBL 174, at No. 116,Pok Fu Lam Road, Hong Kong 116 Pok Fu Lam Road, Hong Kong RBL 174 BD 2/2007/86 28 August 2001 Construction near sensitive

site

856 2011 Wong Tung & Partners Ltd Proposed Teaching Hotel Development - The ChineseUniversity of Hong Kong

18 Chak Cheung Street, Shatin, NewTerritories STTL 437 and ext thereto BD 2/9003/02 12 June 2008 (OP) ;

August 2008 (PC)

Protect the naturalenvironment has a differentimpact in the planning andconstruction process.

857 2011 Aedas Ltd Tradeport Logistics Centre Development Unit 8, 2M, 21 Chun Yue Road, HongKong International Airport CLK 1 and ext BD 2/9806/01 January 2003

How does the contractualrelationship with contractorpromote the progress andquality of the project.

858 2011 K & W Architects Limited Proposed Composite Development on 42-44 Belcher'sStreet

42-44 Belcher's Street, Kennedy Town,Hong Kong IL 953 Sec C, Sec D BD 2/2038/04 5 January 2011 In-house Contractor System

859 2011 Andrew Lee King Fun & Associates Architects Ltd 633 King's Road 633 King's Road, North Point IL 7860 BD 3004/04 May 2007Architect's solution to themajor change of use of thebuilding during construction

860 2011 SLHO & Associates Ltd Addition and Alteration works of creative mediaworkshop for skyhigh creative partners

5/F, Tin Heng Estate Multi-StoreyCarpark, Tin Shui Wai

HD (ICU) E3/122(N)AA(8) 16 January 2008

Design opportunities andconstraints in convertingcarpark to public facilities

861 2011 WCWP International Ltd SIP Final Phase Package 1, Ho Koon Nature Educationcum Astronomical Centre

101 Route Twist Tso Kung Tam Park,Tsuen Wan TWTL 359 BD 3/3086/02 (P) 25 August 2005

The project presents achallenge on highly restrictivesite, with difficulties related tocarrying out site works withina small site. Futhermore,precaution measures to beprovided to minimize harzards/ disturbance on schooloperation during construction

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

862 2011 Seniorman Design Ltd The Satellite Remote Sensing Ground ReceivingStation Phase II

The Chinese University of Hong Kong,Shatin, New Territories

STTL 437 RP and the extthereto BD 2/9062/06 3 December 2009

Construction procedure andEVA of fire service due to siteconstrain

863 2011 A & T Design Ltd 1881 Heritage 2A Canton Road, Tsim Sha Tsui, Kowloon KIL 11161 BD 2/4023 9 February 2009

The design and administrativeapproaches taken by thearchitects to resolve theconflicts

864 2011 DesignVision Architects Ltd Proposed Redevelopment of China Graduate School ofTheology at 4-5 Devon Road, Kowloon Tong 4-5 Devon Road, Kowloon Tong NKIL 894 BD 2/4026/98 December 2000

How did the architect dealwith the difficulties encounterfor the redevelopment of oldsite in order to satisfy theplanning control requirement

865 2011 Ronald Lu & Partners (HK) Ltd Daisy Li Hall Student Quarters Chinese University of Hong Kong, Shatin,New Territories STTL 437 BD 9206/98 (P) 9 October 2002 Contract Administration

Aspect

866 2011 Ronald Lu & Partners (HK) Ltd SIP Final Phase - Package 4 S316, Pui Ying College atSha Tin

S316, Pui Ying College, Wo Che Estate, 9Fung Shun Street, Shatin, New Territories

VO 103, Plan No. STM6154A

ASD303/6487/EX/E20/S3 1 June 2005 How the architect respond to

the liquidation of contractor

867 2011 Chau Ku & Leung Architects & Engineers Ltd Composite Redevelopment of 8-12, Baker Court 8-12 Baker Court, Hung Hom, Kowloon KIL 11181 BD 2/4004/09 July 2011 Architect's role in solving landmatters

868 2011 Wong & Ouyang (HK) Ltd Villa Esplanada Phase II 8 Nga Ying Chau Street, Tsing Yi TYTL 129 BD 2/9123/95 12 March 1999

Impact of economicalbehaviour on architect'sdecision and architecturaldesign in Hong Kong

869 2011 Wong & Ouyang (HK) Ltd Lincoln House 979 King's Road, Taikoo Place, IslandEast, Hong Kong

QBML 1 RP, sQ, sR, ss1,sRRP, sS, sTss1, sTss2,sTRP, sU and sW

BD 2/3017/94 7 September 1998BEAM Plus standards and thearchitect's role in the buildingindustry today.

870 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Tseung Kwan O Public Transport Interchange Tseung Kwan O Town Centre, Area 56,TKOTL 72 TKOTL 72 BD 2/7196/98 2002

Investigate building designmeasures of the PTI such asplan layout, vertical access,fire escape routes, structureetc, that allow theincorporation of the above

871 2011 Architecture Design & Research Group Ltd Hong Kong Community College Development at WestKowloon 9 Hoi Ting Road, West Kowloon KIL 11176 BD 2/4050/05 28 March 2008

Contractual resolution inrelationship with tightconstruction programme

872 2011 WT Architects (Management) Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam IL 8969 RP BD 2/2042/99/ST 3 14 October 2003 (OP) ; 1April 2004 (PC)

How architect to help buildingservices systems to meet therequirement of relevantdepartments

873 2011 AGC Design Ltd Proposed Residence at 1 Pueves Road, Jardine'sLookout

1 Purves Road, Jardine's Lookout, HongKong IL 7193 BD 2/3019/08 December 2010

Tree Felling and TreePreservation clause and itsimplications on project

874 2011 Wong & Ouyang (HK) Ltd Commercial Development of Dorset House and PCCWTower

Taikoo Place, 979 King's Road, QuarryBay, Hong Kong

QBML 1RP, sQ, sRSS1,sRRP, sS, sTSS1, sTSS2,SULSW

BD 3011/89 December 1994Architectural solutionstowards multi-clients within atwin-tower

875 2011 Wong & Ouyang (HK) Ltd Pok Oi Hospital Redevelopment and Expansion Au Tau, Yuen Long, New Territories Lot No. 1630 in DD 115 BD 2/9164/00 21 April 2006 Hospital Circulation Design

876 2011 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed residential development at Hung Shui Kiu,Yuen Long, Lot 2064 in DD 121 Lot 2064 in DD 121 BD 2/9177/05 BD 2/9177/05 31 May 2011 PM + CM management

system of Cheung Kong Ltd

877 2011 WCWP International Ltd SIP - Final Phase, Package 1, S338 - St. Paul'sConvent School

140 Leighton Road, Causeway Bay, HongKong IL 1018 BD 3/3083/01 (P) 25 June 2005

878 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Hong Kong Polytechnic University, Phase VII Hung Hom, Kowloon KIL 9853 RP and ext BD 2/4004/02 November 2004

How the extraordinaryfoundation design as aconsequence affecting thewhole constructionprocedures and increasingthe complexity of contractualprocedure in relation to thebudget control forconstruction and the building

879 2011 Hsin Yieh Architects & Engineers Ltd Property Development at Tai Wai Maintenance Centre(Phase 1) / Festival City 1 Mei Tin Road, Tai Wai, New Territories STTL 529 BD 2/7897/99/2 3 February 2010 (OP) ; 6

February 2010 (PC) Phasing and demarcation

880 2011 LWK & Partners (HK) Ltd Residential Development at 21 Tung Shan Terrace(Notting Hill) 21 Tung Shan Terrace, Hong Kong IL 2933 BD D72/78/HK 21 June 2002 (OP) ; 1

August 2002 (PC)

How architect deal with siteconstraints not only to solveproblem but also to achieveaesthetic pursuit

881 2011 Aedas Ltd Skycity Marriott Hotel - Phase 1 1 Skycity Road East CLK Lot No 1 RP BD 9094/06 12 August 2008 Adopting prefabricationconstruction method

882 2011 Simon Kwan Architect & Associates Ltd Ma Wan Residential Development Area Phase 6 8 Pak Lai Road, Ma Wan Island MWL 392 BD 9160/97H (7) 30 June 2009 (OP)Issues in relation to over 10years span of RDAimplementation period.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

883 2011 Arthur C.S. Kwok Architects & Associates Ltd District open space at Tseung Kwan O Area 37 andLocal open space at Fanling, Sheung Shui Areas 25

6 Man Kuk Lane, Tseung Kwan O (TKO) ;On Lok Mun Street Playground, On LokMun Street, Fanling (FL1) ; One FokStreet Playground, On Fok Street, Fanling

SSW 318 July 2011Comparison betweengovernment and privateprojects.

884 2011 Steve Leung Architects Office Development at 9 Chong Yip Street, KTIL 444 9 Chong Yip Street, Kwun Tong KTIL 444 BD 4035/02 March 2004Architect's role in the event ofa major late stage change inbuilding use and design brief

885 2011 Wong & Ouyang (HK) Ltd Sheung Shui Slaughterhouse 15 Chuk Wan Street, Sheung Shui Area 2B, Sheung Shui July 1999

Administration procedure andconstruction managementaddressed in design and buildcontract.

886 2011 Foster + Partners Cathay Pacific Lounges Level 5, Zone 50, Terminal 1, Hong KongInternational Airport, Chek Lap Kok

CLK Lot No 1 PR and extthereto BD 2-3/9702/94/180 30 July 2010 Bespoke designer furniture:

Intellectural ownership

887 2011 Andrew Lee King Fun & Associates Architects Ltd Southern Lodge, Residential Development 358-364 Un Chau Street, Sham Shui Po,Kowloon NKIL 2866 sF & RP BD 4005/04 6 March 2008

New residential buildingtypology under new practicenotes and SBD guidelines

888 2011 P & T Architects & Engineers Ltd Kowloon Station Package 4 1 Austin Road, Kowloon KIL 11080 BD 2-3/7204/99 25 July 2003 Building defects

889 2011 The Oval Partnership Ltd 3-5 Star Street 3-5 Star Street, Wanchai, Hong Kong 2837 sCss1 and sCRP BD 2/3027/07 September 2011 (PC)Fire engineering process forrealizing untypical designsolution

890 2011 KPF (Hong Kong) Ltd Kerry Centre 865 King's Road, Quarry Bay, Hong Kong IL 9021, formerly 7737, 8637 BD 2/3007/06End of September 2010(OP) ; End of December2010 (PC)

Building informationmanagement in constructionindustry: influences on localpractice collaborativeprocess, future developmentand design profession liability

891 2011 Hong Kong Housing Authority Public rental housing development at Tin Shui Wai Area103 (Phase 1) Tin Shui Wai Area 103 Lot No. 103 YL 28 March 2008 Carport Planning and

Development, Community892 2011 P & T Architects & Engineers Ltd 3-5 Plunkett's Road, The Peak, Hong Kong, RBL 647 3-5 Plunkett's Road, The Peak Hong Kong RBL 647 BD 2024/04 April 2008 Sustainability design

893 2011 Aedas Ltd Tung Chung Cable Car-Ngong Ping Terminal Ngong Ping Road, Lantau BD 2/9905/03 (NPT)(P) 17 May 2006 How architect dance with

chain

894 2011 Aedas Ltd Logistic Centre, Kwai Chung Town Lot 507, Kwai Chung Town, ContainerPort Road South, Hong Kong Lot No 507 BD 2/9102/08 May 2011 Lease Conditions

895 2011 Aedas Ltd Architectural Consultancy Services for No. 50, 55, 57-59 Connaught Road, Central 50, 55, 57-59 Connaught Road, Central

ML 384, ML 385, ML 387, ML388, ML 389 RPsA, ML 390RP sB and sA

BD 2/2023/07 22 February 2011 Leed Certificate Measure

896 2011 P & T Architects & Engineers Ltd 661-665 King's Road 661-665 King's Road, North Point, HongKong IL 8885 BD 3068/94 30 September 1999 (OP) ;

30 March 2000 (PC)

Project Programme:Preliminary, Construction andExtension

897 2011 Aedas Ltd Redevelopment of St. Rose of Lima's School 4 Embankment Road, Kowloon KIL 2356, 2585 BD 4012/08(P) July 2011 (Anticipated) Design Adaption with ExistingTrees

898 2011 Leigh & Orange Ltd Ocean Park Redevelopment - Rain Forest Summit, Ocean Park, 180 Wong ChukHang Road, Aberdeen RBL 1020 RP and ext BD 2/2032/07 (P) 15 February 2011

Architectural solution indealing with special functionalrequirement

899 2011 Leigh & Orange Ltd Union Hospital Extension Union Hospital, 18 Fu Kin Street, Tai Wai,Shatin, New Territories STTL 168 BD 2-3/9094/04 March 2006

To construct with minimaldisturbance of the operatinghospital

900 2011 Aedas Ltd Hong Kong Jockey Club Shatin Race Course ParadeRing Redevelopment Shatin Race Course STTL 13 BD 2/9091/03 November 2004

901 2011 Ronald Lu & Partners (HK) Ltd Redevelopment of Upper Wong Tai Sin Estate (Phase1) Upper Wong Tai Sin Estate, Kowloon September 2000 Delay of master programme -

Its causes and implications

902 2011 Ronald Lu & Partners (HK) Ltd Stewards Pooi Kei Primary School Lok Ha Square, Fo Tan, Shatin, NewTerritories GLA TST 58 ASD 303/6487/AL

L360/C25/001 August 2004 Main Contractor's Liquidation

903 2011 Ronald Lu & Partners (HK) Ltd School Improvement Programme Final Package -Package 4 Group 5

Lok Sin Tong Chan Cho Chak PrimarySchool, Jat Min Chuen, Shatin, NewTerritories

STTL 28 BD 2/3102/01 (P) 30 September 2005 Project Programme and Delay

904 2011 WMKY Ltd Proposed Commercial Building at J/O Sheung YeeRoad, Wang Tai Road, Kowloon Bay

7 Wang Man Street and 23 Wang TaiRoad NKIL 6280 BD 4/4006/01 7 August 2008 (OP) ; 30

August 2008 (PC) Architectural Design

905 2011 Ronald Lu & Partners (HK) Ltd Proposed residential and retail management at KIL11145, Farm Road, Ma Tau Wai, Kowloon

18 Farm Road, Ma Tau Wai Road,Kowloon KIL 11145 BD 2/4060/00 July 2004

Lease requirement andclient's need - To fulfill leaserequirement and balance theclient's need

906 2011 Ronald Lu & Partners (HK) Ltd Proposed redevelopment of quarantine "B" Stables atSha Tin Racecourse Shatin Racecourse, New Territories STTL 13 BD 2/9189/05 (2) (P) 22 April 2008 (Phase 1) ;

April 2008 (Phase 2) Time Constrict - Programme

907 2011 Wong Tung & Partners Ltd Tsing Yi Station Development Maritime Square 33, Tsing King Road,Tsing Yi, New Territories TYTL 132 BD 2/7162/93-T

8 January 1999 (Blk 2-6) ;7 August 1999(Clubhouse) ; January2000 (Blk 1, 7-12)

How the architect worked withthe Contractor to resolvemany constrain duringconstruction stage

908 2011 Christopher Leung & Associates Ltd Residential Development at 363 Tai Po Road, MonteCarton 363 Tai Po Road, Kowloon NKIL 3512 RP & ext BD 2/4169/93 November 2001

How Architect uses design toresolve site constraints andmaximize development

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

909 2011 Aedas Ltd A&A Works at B1/F to 2/F, Podium, The Landmark,Central, Hong Kong

The Landmark, 15 Queen's Road, Central,Hong Kong

ML 7sARP, ML7sAss3,ML7sBRP, ML2c, ML3sA,ML2sB, ML2sARP, ML2RP,ML2AsBRP, IL 3087

BD 2-3/2216/75/51 April 2007 ; July 2008 (PC) Minimizing the interruption tothe public during construction

910 2011 LWK & Partners (HK) Ltd Proposed residential development on Severn Road 8 Severn Road, Peak, Hong Kong RBL 1148 BD 2/2007/00 August 2005 Residential development onsloping site

911 2011 Simon Kwan Architect & Associates LtdComprehensive Residential and CommercialDevelopment at NKIL 6365, 500 Tung Chau Street,Cheung Sha Wan, Kowloon

500 Tung Chau Street, Cheung Sha Wan,Kowloon NKIL 6365 BD 4082/04 July 2008

The Architect's solution todeal with the tight time framefor meeting the anticipateddate of occupation permit

912 2011 Andrew Lee King Fun & Associates Architects Ltd Po Leung Kuk Choi Kai Yau School 6 Caldecott Road, Kowloon NKIL 6440 BD 2/4052/06 (P) August 2009 Land Grant / Tree FellingProposal

913 2011 Rocco Design Architects Ltd Redevelopment of 31 Queen's Road, Central 31 Queen's Road, Central, Hong Kong IL 2316 BD 2/2059/05 1 June 2011 (TOP) ;October 2011 (Target OP)

Sustainability design, greenfeatures and BEAM Plus

914 2011 Wong & Tung International Ltd Cyberport Development Stage 4 Telegraph Bay, Pok Fu Lam, Hong Kong IL 8969 RP BD 2/2042/99/ST 4

Stage 4a: July 2002 (OP) ;August 2002 (PC) ; Stage4b: December 2002 (OP) ;December 2002 (PC)

How extraordinary foundationsystem affecting constructionprocedures and increasingcomplexity of contractualprocedure

915 2011 Wong Tung & Partners Ltd Comprehensive Hotel, Office, Residential andCommercial Development (Phase 3)

3 Tong Tak Street, Tseung Kwan O, NewTerritories TKOTL 72 BD 2/7196/98 (2) Targeted to be end of

September 2011Design change to meet clientrequest

916 2011 Architecture Design & Research Group Ltd The Lingnan University News Campus Development ofStudent Hostel and Academic Block

The Lingnan University, Junction of TuenKwai Road and Castle Peak Road, TuenMun, New Territories

TMTL 482 BD 2/9097/08 August 2011 (OP) Acoustic window

917 2011 Andrew Lee King Fun & Associates Architects Ltd Proposed industrial building at No. 37-39 Wing HongStreet and No. 70-72 King Lam Street, Cheung Sha

37-39 Wing Hong Street and 70-72 KingLam Street

NKIL 2828 RP, sARP, 4sAss2 BD 4005/06 17 November 2008 (OP) ;

27 November 2008 (PC)Industrial building in 21stCentury Hong Kong

918 2011 Andrew Lee King Fun & Associates Architects Ltd Extension of School Block for Fanling LutheranSecondary School

270 Jockey Road, Fanling, NewTerritories FSSTL 228 BD 2/9022/05 (P) 6 December 2010

How Architect response incase of emergency duringconstruction period?

919 2011 Andrew Lee King Fun & Associates Architects Ltd Hotel Development at 165-167 Wai Yip Street and HowMing Street 163 Wai Yip Street KTIL 752 BD 2/4074/94 (Pt III) 23 January 2007

Architect's solution againsttight programme and client'sbudget control

920 2011 Andrew Lee King Fun & Associates Architects Ltd Proposed Industrial Building at No. 4-6 Kom TsunStreet and 932 Cheung Sha Wan Road 932 Cheung Sha Wan Road NKIL 3874 and NKIL 3951 BD 2/4030/08 14 January 2011 (OP)

How Architect response tocompliance with ordinance,requirement from the clientand coordination withcontractors. Ethicalresponsibility of Architect

921 2011 Andrew Lee King Fun & Associates Architects Ltd Proposed Hotel Building at 38 Bowrington Road,Wanchai, Hong Kong

38 Bowrington Road, Wanchai, HongKong Lot No. 8263 BD 2/3023/07 January 2011 (OP) ;

March 2011 (PC)How Architect works toovercome site constraint

922 2011 Foster + Partners The New Cathay Pacific HKIA Lounges (The Wing)(Phase 1)

Level 6 and 7, Zone 15 and 16, Terminal1, Hong Kong International Airport

CLK Lot No. 1 RP and extthereto BD 2-3/9702/94/184 June 2011 (Phase 1)

Precautionary work duringphasing and interfacingexisting building components

923 2011 CSI Property Holdings Ltd Proposed Commercial Development 8 Hau Fook Street, Kowloon KIL 9201 RP BD 4038/06 February 2011 Project Management

924 2011 Andrew Lee King Fun & Associates Architects Ltd Addition of A New Annex 26 Sung On Street, To Kwan Wan,Kowloon 29 June 2010 Conflict between time and

operation of school

925 2011 Andrew Lee King Fun & Associates Architects Ltd Development at 600 Canton Road, Yau Ma Tei,Kowloon

590-600 Canton Road, Yau Ma Tei,Kowloon

KIL 1556 sERP, KIL sF, KIL1556 RP, KIL 1556 sG BD 2/4045/06 30 July 2010

Architect, as a leadconsultant, to co-ordinate withvarious consultants andgovernment departments forsolving contraditory landsissue before application of

926 2011 P & T Architects & Engineers Ltd Commercial Development at IL 8822 Tamar (Citic Off Harcourt Road, Hong Kong IL 8822 BD 2/2042/95 July 1997 Short Construction

927 2011 P & T Architects & Engineers Ltd Private Sector Participation Scheme in Area III, TinShui Wai, Yuen Long (Grandeur Terrace) Tin Shui Wai Area 111, Yuen Long TSWTL 28 BD 9030/00 December 2002

Balance betweencharacteristics of privateresidential development andpublic housing developmentin PSPS as an architect

928 2011 Wong & Ouyang (HK) Ltd Hong Kong Convention and Exhibition Centre AtriumLink Expansion 1 Expo Drive, Wanchai, Hong Kong GLA 840 March 2009

Design coordination anddevelopment with existingbuildings and the concurrentoperation of HKCEC

929 2011 WCWP International Ltd SIP Final Package 1, King Ling College 1 Lam Shing Road, Tseung Kwan O, NewTerritories TKOTL 41 BD 2/9311/93 18 October 2005

Architect's approach to addnew elements to an existingbuilding with minimalalternation and disturbance to

930 2011 Handi Architects Ltd Residential Redevelopment at 54, 56, 58 Mount KelletRoad, The Peak 54 Mount Kellet Road, The Peak RBL 532 BD 2/2054/06 18 May 2011 Supplementary agreement

between client and contractor

931 2011 P & T Architects & Engineers Ltd Residential Development at RBL 513 RP and RBL 540sA, 10 Pollock's Path, The Peak 10 Pollock's Path, The Peak RBL 513 RP and RBL 540 sA BD 2030/02 30 July 2007

Construction at scheduledarea and its diffculties inproject management

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

932 2011 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RV) Cyber Port Road (Stage 10-12) (Area RV),Cyberport, Pokfulam IL 8969 sB BD 2/2042/99/ST 10-

12(A) August 2008 GRC Architectural Feature onFaçade

933 2011 WCWP International Ltd Renovation Works at Raimondi College PrimarySection

1-E, Shiu Fai Terrace, Stubbs Road,Wanchai, Hong Kong IL 7936 BD 2-3/2259/62/4 November 2009

Comparison of considerationson design, time and budgetconstraints between A&Awork of the project and theSIP from Government will befurther discussed

934 2011 WCWP International Ltd Hotel at IL 8774, 133 Leighton Road, Causeway Bay,Hong Kong - Lanson Place Hotel

133 Leighton Road, Causeway Bay, HongKong IL 8774 BD 2-3/3063/97/2 13 December 2005

Building performance bycomparing the originalintention and final outcomeincluding statutory approach,design approach

935 2011 Leigh & Orange Ltd Construction of Extension Block to Pui Ling School ofPrecious Blood, Fanling

13 On Lok Mun Street, On Lok Tsuen,Fanling FSSTL 194 BD 2/9170/06 (P) 8 July 2009 Minimize construction period,

including the extension days

936 2011 Andrew Lee King Fun & Associates Architects Ltd 133 Hoi Bun Road 133 Hoi Bun Road, Kwun Tong, Kowloon KTIL 756 BD 2/4050/08 16 May 2011Advantages anddisadvantages of proceduresthat deviate from common

937 2011 Design 2 (HK) Ltd Mental Health Association of Hong Kong Pak TinChildren's Center Cornwall Street, Sham Shui Po, Kowloon GLA NK 705 10 July 2009

Accesible built-environmentfor children with severe metalhandicap

938 2011 Wong Tung & Partners Ltd Development at Kowloon Bay, Enterprise Square 5Phase 1 (Mega Box) 38 Wang Chiu Road, Kowloon Bay NKIL 5927 BD 2/4042/02 29 December 2006 (OP) ;

15 January 2007 (PC)

Innovative solution to fireescape strategy, firecompartment and FS system

939 2011 Simon Kwan Architect & Associates Ltd URA Redevelopment at Johnston Road, IL 8997 60 Johnston Road, Wanchai, Hong Kong IL 8997 BD 2/9032/03 November 2007 Redevelopment of Historially -Valuable Building

940 2011 LWK & Partners (HK) Ltd Proposed Composite Building at Yiu Hing Road, ShauKei Wan, SIL 845 88 Yiu Hing Road SIL 845 BD 2/3010/00 4 February 2003 How do new regulations affect

program and design of

941 2011 Meta 4 Design Forum Ltd Broadway Cinematheque (YMT) A&A Projects G/F and 1/F, 3 Public Square Street, YauMa Tei KIL 10878 BD 2-3/4092/87/8

1st Phase - 15 September2011 ; 2nd Phase - 31October 2011

Comparison of theadvantages anddisadvantages of running aproject with / without usingstandard form of building

942 2011 Omar Yeung Architect & Associates Ltd Redevelopment of Provincial House of the FranciscanMissionaries of Mary 104 Boundary Street, Kowloon KIL 2375 BD 2/4070/08 22 February 2011 (OP) ;

25 February 2011 (PC)

Several architects who arecatholic members of theclient's church volunteered asadditional architecturalconsultant representing theclient together with providingdesign input, resulting incomplicated relationshipbetween the client and thearchitect (OYA) and architects(Volunteered Architects)

943 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd A&A Works at Pioneer Center 750 Nathan Road, Kowloon KIL 2111 BD 2-3/4157/89/9, 11,13 Apr 05

944 2011 LWK & Partners (HK) Ltd Proposed Residential Development at Kowloon InlandLot No. 11122, Hau Man Street, Homantin, Kowloon Hau Man Street, Ho Man Tin, Kowloon KIL 11122 BD 4030/00 26 May 2003

Noise control strategy, Timesaving strategy foroverlapping the buildingconstruction and slope work.

945 2011 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd PSPs Tsing King Road (TYTL 163) Tsing King Road, Tsing Yi TYTL 163 BD 2/9042/00H March 2003

The special role of theArchitect within this designand build structure will also bereviewed under the special

946 2011 Integrated Design Associates Ltd ESF Discovery Bay Private Independent School 38 Siena Avenue, Discovery Bay, HongKong

Area N4b at the RemainingPortion of Lot 385 in DD 352and the ext thereto

BD 2/9121/02 (P) June 2008 (OP) ; August2008 (PC)

Difficulties encountered inapplying environmentaldesign technology

947 2011 P & T Architects & Engineers Ltd School A (324EP) - Primary School Hiu Kwong Street, Sau Mau Ping, KwunTong, Kowloon NK 722 ASD 102/5815 &

6736/EA/9AM011 May 2008 Land allocation betweenGovernment Bodies

948 2011 P & T Architects & Engineers Ltd St. Paul's Co-Educational College Primary School 11 Nam Fung Path, Wong Chuk Hang,Hong Kong GLA-HK 1023 July 2008 (PC1) ; August

2008 (PC2) Programme Management

949 2011 Global Atelier Ltd Kingston International School 105 Waterloo Road, Kowloon Tong, Lot No. 708 BD 2/4022/09 27 August 2010 Section 16 Submission

950 2011 Kwong & Associates Ltd Proposed Composite Development at 78, 78A-CWaterloo Road Nos. 78, 78A-C Waterloo Road, Kowloon KIL 3903 sA, sB, sC & sE BD 2/4032 18 January 2007 Private Street Drainage

Improvement Work

951 2011 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd Sausalito 1 Yuk Tai Street, Ma On Shan, New

Territories STTL 487 BD 2/9114/04 (Pt. IV) November 2007 Issues raised by precast façade from design to

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

952 2011 Wong & Tung International Ltd Proposed Service Apartment Development 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004

Under the distinct siteconstraint, research onArchitect and Developer'sMaster Planning and BuildingLayout helps to achieve noisebarrier shielding effect for thedevelopment

953 2011 Ronald Lu & Partners (HK) Ltd Residential Development at STTL 82 (Double Heaven) 52 Ma Lok Path, Kau To Shan, Shatin STTL 82 BD 2/9230/95 11 May 2002Influence of EconomicalCondition on Design andConstruction

954 2011 LWK & Partners (HK) Ltd Proposed Residential Development in 10-18 WharfRoad, North Point

10-18 Wharf Road, North Point, HongKong Lot No 7433 - 7443 BD 3017/00 July 2003 Construction near sensitive

site

955 2011 H. C. Wu Architect & Associates Residential Development at Ma Fung Ling Road, TongYan Sun Tsuen, Yuen Long, New Territories

Ma Fung Ling Road, Tong Yan SunTsuen, Yuen Long, New Territories Lot 1740 in DD 122 BD 2/9129/02 December 2007 (Phase 1)

; June 2007 (Phase 2)

How the project teamorganization affects theproject as a whole

956 2011 ARCA Ltd Reprovisioning of the Buddhist Po Kwong School Tin Sum Village, Fanling, New Territories FSSTL 40 29 May 2003 Environment and SustainableChallenge

957 2011 Wong & Ouyang (HK) LtdAlteration and Addition Works - Proposed Hotel in theAtrium Tower Pacific Place at IL 8571 Queensway,Hong Kong

88 Queensway, Hong Kong IL 8571 BD 2-3/2013/85/49

12 June 2009 (BA14 -Bldg A&A) ; 19 June 2009(BA - 14 Acknowledge) ;27 August 2009 (BA14 -

Conversion of a servicedapartment into a boutiquehotel

958 2011 WCWP International Ltd Grand Promenade - Composite Development 38 Tai Hong Street, Sai Wan Ho, HongKong IL 8955 BD 2/3002/01

21 June 2005 (Phase 1a,1b) and 19 August 2005(Phase 2)

GovernmentAccommodations DesignProcess

959 2011 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Commercial / Residential Redevelopment atKML 102 RP, Ma Tau Kok 38 San Ma Tau Street, Kowloon KML 102 RP BD 2/4006/2 5 August 2005 (OP) ;

November 2006 (PC)How design change to suit thecontemporary market strategy

960 2011 Aedas Ltd AIG Tower 1 Connaught Road, Central, Hong Kong ML 275 and ML 275 sA & RP BD 2004/01 April 2005 (OP) ; May2005 (PC) Dedication Proposal

961 2011 WCWP International LtdDesign, Renovation and Conversion of Old MarriedQuarters and the Design of Supporting Facilities For theRe-Provisioning of Victoria Prison at Lai Chi Kok

Castle Peak Road, Butterfly Valley,Kowloon GLA-NK699 ALM 302 7 February 2006 Green Issue of Construction

Procedures

962 2011 MAP Architecture & Planning Ltd A&A Works at 19 Middle Gap Road, The Peak, HongKong

19 Middle Gap Road, The Peak, HongKong RBL 378 BD 2/1025/82 1984 (OP) ; April 2011

(PC)

Construction of the NewSwimming Pool Structure andInstallation of Pool Equipmentand Balance Tank

963 2011 Architecture Design & Research Group Ltd A-24 Classroom Primary School at Inverness Road 39 Inverness Road, Kowloon City GLA-NK680ASD55/92050/CWO/025-07

12 May 2010 (PC)

The special topic wouldemphasis on the influenceand constraint due to thischaracteristic of ASD overdifferent stages of the project.

964 2011 P & T Architects & Engineers Ltd Kwai Chung Estate (Phase 7) Kwai Chung Estate, Kwai Chung, NewTerritories November 2002

HKHA, informed by ArchSDthat defects were found at alarge extent of thedevelopment shortly aftercompletion of the DefectLiability Period and disputebetween the Client, Architect

965 2011 LWK & Partners (HK) Ltd Proposed Development at KIL 11124 (Namely ElestialHeights) 80 Sheung Shing Street KIL 11124 BD 4074/04

15 January 2009 (Phase1) ; 23 November 2009(Phase II)

Feasibility Study of thisproject to fulfill currentsustainability design

966 2011 Aedas Ltd Proposed Alteration and Addition Works of NexxusBuilding 77 Des Voeux Road, Central ML 382 Des Voeux Road,

Central BD 2-3/2333/59/3 31 December 2008 Volumetric Calculation andGFA Calculation

967 2011 Kwong & Associates Ltd Relocation of Lo Wu Saddle Club Ho Sheung Heung Road, Sheung Shui,New Territories Short Term Tenacy No. 1408 BD 2/9115/06 (P) 28 September 2007

How Architect control andcomplete a building projectwithin very tight schedule andbudget

968 2011 T. S. Chu Architects Ltd Mai Po Temporary Restaurant Junction of Castle Peak Road and PalmSprings Boulevard, Yuen Long

5-10 in DD 101, Santin, YuenLong BD 2/9041/05 July 2011 Section 16 Application and

Building on Agricultural Land

969 2011 Gravity Partnership Ltd Proposed New 300 Student Hostel DevelopmentUniversity Avenue, The ChineseUniversity of Hong Kong, Shatin, NewTerritories

STTL 437 RP and ext thereto BD 2/9151/06August 2011 (OP -anticipated) ; September2011 (PC - anticipated)

How have the architectaddressed differentchallenges during differentstages of the development?

970 2011 Chau Ku & Leung Architects & Engineers Ltd Proposed Alteration and Addition Works for GrandCentral Plaza at STTL 364 138 Shatin Rural Committee Road, Shatin STTL 304 BD 2-3/9268/90/10 10 July 2009 (BA14) No to Bonus GFA and design

constraints that follow

971 2011 RDL Asia Ltd Proposed Commercial Building 487-489 Lockhart Road IL 2836 sA ss8 and ss4 BD 3002/05 August 2008 Existing Party Staircaseswere retained adjoining the

972 2011 A. Lead Architects Ltd Monmouth Terrace Residential Project 9K Kennedy Road, Hong Kong IL 8435 BD 3013/08 November 2010 (OP) ;December 2010 (PC)

How the Architect work withdifferent consultants toovercome different sitecontraints and gets an optimalsolution

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

973 2012 Cheung Kong Yeung Architects Ltd Proposed Residential Development 11 Verbena Road, Kowloon Tong NKIL 4610 BD 4062/07 3 August 2009 Contract Comparison

974 2012 Christopher Leung & Associates Ltd Residential Development at 363 Tai Po Road, MonteCarton 363 Tai Po Road NKIL 3512 RP & ext BD 2/4169/93 March 2001

How the different roles of theArchitect help to achieve amore economically justifiabledevelopment.

975 2012 WCWP International Ltd School Improvement Work for Po On CommercialAssociation Wong Siu Ching Secondary School

2 Tai Pai Street, Tsuen Wan, NewTerritories TWTL 275 BD 3/3100/01(P) 26 August 2005

Administration Process of BDsubmission and approval inphasing, resulting the twophases of issuance of TOPand OP.

976 2012 Hong Kong Housing Authority Public Rental Housing Development at Choi Wan Road(Site 2 Phase 2) Choi Wan Road, Kwun Tong VO 233 HD (AR) 826/2 30 May 2011 Overcome site constraints at

design and construction

977 2012 Wong Tung & Partners Ltd Proposed Hotels and Service Apartment Developmentin Tsing Yi 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004

With the unique location ofthe site, being adjacent to theContainer Terminal No. 9, andthe objective to deliver aNoise Screening Barrierdevelopment under the non-typical lease conditions, thesite constraint became thecritical design parameters forthis project. In the specialtopic, the critical issue onArchitects and developerapplying buildingmodifications to buildingdepartment has become thekey throughout the entiredesign and construction

978 2012 Aedas Ltd Hong Kong International Airport Skypier 2 Hong Kong International Airport, Chek LapKok

CLK Lot No. 1 RP & extthereto

BD 2/9028/05 (P) (PtIII) August 2009

979 2012 LWK & Partners (HK) Ltd Proposed Domestic Building 244 Aberdeen Main Road, Hong Kong AIL 287 & ext BD 2/2052/96 August 2000How the Architect hadovercame the challenges andhis solutions for implementing

980 2012 P & T Architects & Engineers Ltd Proposed Residential Redevelopment at RBL 693, 14Headland Road, Southside, Hong Kong

14 Headland Road, Southside, HongKong RBL 693 February 2009 (OP) ;

August 2009 (PC)

Design Constraints withrespect to DifferentDimensions of Control fromVarious Government

981 2012 Leigh & Orange Ltd Conversion and extension to De La Salle SecondarySchool under School Improvement Programme Kam Tsin Village, Sheung Shui 2434 in DD 92 BD 2/3017/01 (P) 6 July 2004

Interface connections /conflicts between the existingand new annex.

982 2012 Chau Ku & Leung Architects & Engineers Ltd Alteration and Addition Works at Podium Levels, TuenMun Town Plaza

Tuen Mun Street, Tuen Mun, NewTerritories TMTL 209

BD 2-3/9144/83/23(Phase 1 and Phase2) ; BD 2-3/9144/83/28 (Deckover void)

Phase 1 - 28 July 2006(PC) ; Phase 2 - 6September 2007 (PC) ;Deck over void - 18December 2010

To investigate how new codesand regulations, on thecontrary of being alwaysthought of as "restricting thecreative mind", through theArchitect's interpretations andsolutions, were able to turninto opportunities.

983 2012 KPF (Hong Kong) Ltd Hysan Place 500 Hennessy Road, Causeway Bay Sub section of FF of IL 29and RP of ML 365 BD 2/3017/04 29 March 2012

Skygardens of the First pre-certified LEED PlatinumBuilding in Hong Kong.

984 2012 Ronald Lu & Partners (HK) Ltd Construction of Swimming Pool Complex in Area 2,Tung Chung 5 Tat Chung Road, Tung Chung GLA IS 440 (Phase 1) ;

TGLA TIS 560 (Phase 2)ASD302/6536/RA/9AQ017 November 2011 (PC) An unique feature, the

membrane roof.

985 2012 Andrew Lee King Fun & Associates Architects Ltd Two Integrated Teachning Buildings, The ChineseUniversity of Hong Kong

The Chinese University of Hong Kong,Shatin, New Territories RP of STTL 437 & ext BD 2/9082/08 30 August 2012

(anticipated) International Collaboration

986 2012 Architectural Services Department A 24-classroom primary school in Area 55, Tuen Mun 11 Kwun Tsing Road, So Kwun Wat, TuenMun, New Territories GLA TM420 ASD

51/6348/EA/E20/086 July 2011 (PC)Precautions to be taken forprojects with undergroundhistorical relics.

987 2012 Andrew Lee King Fun & Associates Architects Ltd Ermald Garden Ma Tin Road, Yuen Long, YLTL 515 YLTL 515 BD 2/9088/05 30 October 2010 How architect works toovercome road subsidence.

988 2012 Leigh & Orange Ltd Creative Media Centre, City University of Hong Kong 18 Tat Hong Avenue Lot No 6264 BD 2/4011/04(P) November 2010Codes with implications andcontrol in planning and designaspect.

989 2012 Ronald Lu & Partners (HK) Ltd CIC Zero Carbon Building 8 Sheung Yuet Road GLA-NK 786

1115/AA/12 (asassigned byIndependent CodeCompliance Checker)

20 June 2012Evaluation of Architect'sApplication of Passive andActive Sustainable Strategies.

990 2012 RMJM (HK) Ltd Jockey Club World Wide Fund for Nature Marine LifeCenter Hoi Ha Wan, Sai Kung West Country Park Lot No 448 in DD 283 BD 2/9193/97 May 2003

Sustainable Design - Pro andCon for the development anddesign of the project.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

991 2012 Andrew Lee King Fun & Associates Architects Ltd Redevelopment of Li Shu Fan Site, Phase 1, TheUniversity of Hong Kong 5-7 Sassoon Road, Pokfulam, Hong Kong IL 7746 BD 2/2003/06 10 June 2011

How the architect adapts theirdesign to meet the client'srequirements and to complywith various statutoryrequirements due to special

992 2012 Andrew Lee King Fun & Associates Architects Ltd Building Extension of Fanling Lutheran SecondarySchool 270 Jockey Club Road, Fanling FSSTL 228 BD 2/9022/05(P) 6 December 2010

How Architect Response incase of emergency duringconstruction period?

993 2012 Aedas Ltd Hong Kong Jockey Club Shatin Race Course ParadeRing Redevelopment Shatin Race Course STTL 13 BD 2/9091/03 November 2004 Tensile Metal Roof

994 2012 WCWP International Ltd Proposed Residential Development at No. 11Macdonnell Road 11 Macdonnell Road, Hong Kong Sec P, Q and R of IL 1381 BD 2/2019/98 June 2002 Conflict between sustainability

and Interest.

995 2012 Ronald Lu & Partners (HK) Ltd Proposed Alteration and Addition Works for Gateway IHarbour City, Canton Road

Harbour City 3-27 Canton Road, Tsim ShaTsui, Kowloon KML II Section D BD 2-3/4164/89/7 May 2012

A&A works in operating hightraffic shopping mall andoffice tower entrance.

996 2012 P & T Architects & Engineers Ltd Redevelopment of Industrial Building Kiu Tau Wai, Ping Shan, Yuen Long, NewTerritories Lot No 432 in DD 127 BD 2/9122/07 (Pt II) February 2011

Relaxation of Building Heightand Number of Storey, LandExchange etc.

997 2012 Global Atelier Kingston International School 105 Waterloo Road, Kowloon Tong, Lot No 708 BD 2/4022/09 27 August 2010 Section 16 Planning

998 2012 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

YLTL 486, Yuen Long, New Territories - ScenicGardens

YLTL 486, 25 Town Park Road South,New Territories YLTL 486 BD 2/9220/93/P 30 December 1997 Scheduled Area No 2

999 2012 Wong & Ouyang (HK) Ltd Proposed Development For Hang Seng ManagementCollege at Hang Shin Link, Siu Lek Yuen, Shatin

Hang Shin Link, Siu Lek Yuen, Shatin,New Territories STTL 546 BD 2/9111/11(P) September 2012

Measures taken to fulfillclient's requirement on thetime of possession of the

1000 2012 Y. I. & Associates Ltd Proposed A&A Works for Island South Campus of HKUSpace

3 Wah Lam Path, Wah Fu Estate, HongKong

GLA HK 1077 (Formerly IL8105) BD 2/3094/02(P) July 2011 Realization of Sustainable

Design.

1001 2012 Architecture Design & Research Group Ltd The Lingnan University New Campus Development,Student Activity Centre and Spectator Stand Tuen Fu Road, Tuen Mun, New Territories TMTL 410 BD 2/9125/96(P) 19 December 2007 Street hydrant issue and

liaison with FSD.

1002 2012 H. C. Wu Architect & Associates Proposed Residential Development at Tan Kwei Tsuen,Yuen Long

Tan Kwei Tsuen, Yuen Long, NewTerritories Lot No 4296 in DD 124 BD 9015/97 March 2005 Challenges on

Unconventional façade

1003 2012 LWK & Partners (HK) Ltd Proposed Residential Development at Kowloon InlandLot No 11122, Hau Man Street, Ho Man Tin, Kowloon Hau Man Street, Ho Man Tin, Kowloon KIL 11122 BD 4030/00 26 May 2003 Frequent design change.

1004 2012 Andrew Lee King Fun & Associates Architects Ltd Macpherson Indoor Stadium and ResidentialRedevelopment

10 Yim Po Fong Street, Mongkok,Kowloon KIL 11050 BD 4002/93 September 2012 How the Architect dealt with a

delayed programme.

1005 2012 Andrew Lee King Fun & Associates Architects Ltd Residential Development at 33 Lai Chi Kok Road,Kowloon 33 Lai Chi Kok Road, Kowloon KIL 6284 BD 2/4031/05 2 October 2008 (OP)

Study the implication onArchitect's practice,construction process andproject outcome incomparison to normal

1006 2012 Aedas Ltd 43-63 Tai Yuen Street and 242-246 Queen's Road EastWanchai Hotel Development

43-63 Tai Yuen Street and 242-246Queen's Road East, Wanchai

IL 5663-5, IL5669-73, IL5696-9 BD 3/3034/08 August 2012 Acrylic panel as used in

exterior.

1007 2012 Andrew Lee King Fun & Associates Architects Ltd No. 83 Sycamore Street, Kowloon No. 83 Sycamore Street, Kowloon KIL 11159 RP BD 2/4002/00H 6 October 2008

Balance of statutory poweramongst Building Ordinance,TPB and lease, and appraisalon this developmentregarding this issue.

1008 2012 Andrew Lee King Fun & Associates Architects Ltd Upgrading of School Facilities for China HolinessCollege at 170 Wai Wai Road, Sham Shui Po, Kowloon

170 Wai Wai Road, Sham Shui Po,Kowloon NKIL 3887 BD 3/4029/03 5 December 2008

Implication on thedevelopment of public laneconverting to private lane

1009 2012 Wong Pun & Partners Ltd A&A Works For Buddhist Tai Hung College 38 Cheung Fat Street, So Uk Estate,Sham Shui Po, Kowloon NKIL 5137 BD 2-3/4114/81

25 March 2011 submitBA14, resubmission ofBA14 within June 2012

Zoning and programmaticsequencing of works inoperating school.

1010 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Residential Development at No. 2 Oxford 2 Oxford Road, Kowloon Tong, Kowloon NKIL 4128 BD 2/4054/10 4 June 2012 Unauthorised Building Work

1011 2012 Wong & Ouyang (HK) Ltd 28 Hennessy Road 28 Hennessy Road, Wanchai, Hong Kong IL 2244 RP, 2245 RP andMarine Lot 23 BD 2/3004/09 10 July 2012

Complicated Internal FeatureDesign on Podium Floorswhich requires architects'immediate response andactions to cope with the tight

1012 2012 P & T Architects & Engineers Ltd Redevelopment of Liu Chong Hing Bank Building 24 Des Voeux Road, Central Section A of ML 62 BD 2-3/2043/01 August 2006 Façade Design - Curtain Wall

1013 2012 P & T Architects & Engineers Ltd Residential Development at Hoi Fai Road 10 Hoi Fai Road KIL 11146 BD 3/4061/07 December 2011 (OP) ;July 2012 (PC)

How the architect resolvedconstruction difficulties due tosite constraints.

1014 2012 Aedas Ltd Proposed extension of St. Paul's Co-EducationalCollege 33 MacDonnell Road, Hong Kong IL 8203 BD 2/2033/05 July 2011

How architects solve thechallenges in extensionproject in terms of design andconstruction.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1015 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Noble Place 10 King Fung Path, Tuen Mun, NewTerritories TMTL 263 BD 6/9242/94 December 1997

Compare the old and newbuilding codes to see howthey were reflected in thestudied project from planningof the development, toarchitectural layout designand building envelop; andhow would it be different if theproject is to be executed at

1016 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd DeerHill Bay, Hong Kong Tai Po Road, Tai Po Kau TPTL 135 BD 2/9043/94 October 1998 Site Design and surroundingenvironment.

1017 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Summit 41C Stubbs Road, Hong Kong IL 8870 BD 2/3006/96 September 2002 Curtain wall design.

1018 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Residential and Commercial Development atKIL 11127, Tai Kok Tsui, Kowloon

KIL 11127, 8 Fuk Lee Street, Tai KokTsui, Kowloon KIL 11127 BD 3/4024/99H December 2003 Planning and Design solution

on public open space.

1019 2012 Wong & Ouyang (HK) Ltd Cambridge House 979 King's Road, Quarry Bay, Hong Kong QBML 1sE ss2, QBML 1sFRP & ML703 sN BD 2/3025/00 March 2001 (OP) ; April

2003 (PC)Difficulties and site mattersarise during construction

1020 2012 Hong Kong Housing Department The Construction of Public Rental Housing Estate atShatin Pass 160 Tsz Wan Shan Road, Wong Tai Sin VO 31 20 May 2011

The damage of existingstormwater drain located at7m below ground level.

1021 2012 Simon Kwan Architect & Associates Ltd URA Redevelopment at Johnston Road, IL 8997 60 Johnston Road, Wanchai IL 8997 BD 2/9032/03 November 2007 Redevelopment of historicallyvaluable building.

1022 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Prosperity Tower 39 Queen's Road Central and 19-28 LiYuen Street East

IL 4229 to 4240, 4241 RP to4243 RP BD 2/2061/05 29 November 2011 (OP) ;

17 May 2012 (PC)Challenges of site constraint /congestion.

1023 2012 P & T Architects & Engineers Ltd VTC - Teaching Block Extension 30 Shing Tai Road, Chai Wan CWIL 151 BD 2/3035/07 1 February 2012 Delay in completion time.

1024 2012 A & T Design Ltd Harbourview Horizon Hotel at Hung Hom Hung Hom Bay Reclamation, Kowloon KIL 11103 BD 3/4049/01 22 December 2005 (OP) ;1 May 2006 (PC)

Construction ManagementContract.

1025 2012 Wong Tung & Partners Ltd Proposed Development at TMTL 374, So Kwun Wat,Aegean Coast

TMTL 374, So Kwun Wat, Tuen Mun, NewTerriotories TMTL 374, Area 55A BD 6/9025/97H October 2002

Issues encountered whendeveloping New Territories'sLand.

1026 2012 Leigh & Orange Ltd ASD - School Improvement Phase 4, HK ChineseWomen's Club College

28 Tai Cheong Street, Sai Wan Ho, HongKong SIL 780 and ext BD 1/3039/01(P) March 2004 School Improvement Project.

1027 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Regence Royale 2 Bowen Road, Hong Kong IL 8834, 8848 BD 2/2084/94 September 2001 Construction consideration.

1028 2012 Thomas Chow Architects Ltd Proposed Sports and Dormitory Complex at DiocesanBoy's School 131 Argyle Street, Kowloon KIL 6737 BD 4050/04 6 December 2007

How the architect helptechnically to solve problemsyet to retain design intent andclient budget.

1029 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd King Wah Centre, Hong Kong 620-628 Nathan Road, Kowloon KIL 10336 BD 2/4094/93 June 2001 (OP)

A special study will focus onthe design and technicalstrategies such as planlayout, exit route, buildingconstruction and materials,sanitary fitments, plumbingand drainage facility, etc forthe vertical arrangement ofrestaurant in a high-risebuilding design that architecthas implemented to achievedesign brief and client's

1030 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development of Castle Road and SeymourRoad

2A Seymour Road, Mid-Levels West,Hong Kong

IL 577 Section C to Section J,Section L Sub-Section 1-3,Section L Remaining Portionand Section M

BD 2/2014/03 5 September 2012 (OP) ;October 2012 (PC)

To justify client's claim, thechange of the R(C)7 to R(A)site was viable and would notcause adverse effect to theneighbourhood.

1031 2012 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Yong Ko Hsiao Lin Secondary School Lung Hang Estate, Shatin, New Territories STTL 557ASD62/6487/EX5/E20/500(S297)

September 2004(Conversion) ; March 2005(Annex)

Deletion of Main Contractorand EOT Issue.

1032 2012 Ronald Lu & Partners (HK) Ltd OPUS Hong Kong 53 Stubbs Road, Hong Kong RLB 224 BD 2/3008/07 December 2011 (OP) ;January 2012 (PC)

Necessity of BIM 3D-Modeling in Design and

1033 2012 Aedas Ltd Proposed A&A Works at Trend Plaza (CinemaConversion)

2 Tuen Hop Street, Tuen Mun Town, NewTerritories TMTL 282 BD 2-3/9001/84/10 June 2008

Exploration of Maximizing theleasing area by conversion ofexisting cinema.

1034 2012 Rocco Design Architects Ltd Office Building at Tsing Yi 99 Cheung Fai Road, Tsing Yi TYTL 139 BD 2/7362/02 4 November 2004 (OP) ;15 February 2005 (PC) Building as a noise barrier.

1035 2012 Rocco Design Architects Ltd Teaching Complex at Western Campus, The ChineseUniversity of Hong Kong

The Chinese University of Hong Kong,Shatin, New Territories STTL 437 and ext thereto BD 2/9091/02 7 December 2008 Temporary operation permit

application.

1036 2012 LWK & Partners (HK) Ltd Proposed Commercial and Residential DevelopmentTseung Kwan O Area 57A, TKOTL 57, 66 and 74 Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005

How the architect assessstatutory constrains indifferent stages of building

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1037 2012 P & T Architects & Engineers Ltd St. Mary's Canossian School, Proposed ExtensionBlock 162 Austin Road, Tsim Sha Tsui, Kowloon KIL 9550 BD 2/4054/00/P June 2003 (OP) ; August

2003 (PC)

Architect's solution forminimising the disturbance toexisting user in a schoolenvironment.

1038 2012 Aedas Ltd Tung Chung Cable Car - Ngong Ping Terminal Ngong Ping Road, Lantau Island, NewTerritories N/A BD 2/9905/03 (NPT)

(P) 17 May 2006 How contract types affect aproject.

1039 2012 Leigh & Orange Ltd SIP Phase IV, Group 3, P5, St. Joseph's Primary 48 Wood Road, Wanchai, Hong Kong IL 8176 BD 3/3030/01(P) January 2005 Site constraints.

1040 2012 Wong Tung & Partners Ltd IL8969 Cyberport Residential Deve at Telegraph Bay,Ph. R1, Residential Bel-Air

Residence Bel-Air, Island South, HongKong IL 8969 BD 2/2042/99/ST8

17 June 2004 (Phase 1) ;10 December 2004(Phase 2)

How architect responded tofloor-to-floor height changeduring construction.

1041 2012 MLA Architects (HK) Ltd Proposed Boutique Hotel at 21 Whitfield Road, NorthPoint, Hong Kong

21 Whitfield Road, North Point, HongKong IL 3309 RP & 3310 RP BD 2/3031/06 23 September 2011 (OP) ;

30 September 2011 (PC)

The Architect's response interms of positioning of thebuilding bulk in relation to theexisting site constraints andstriking a balance betweenthe client's aspiration andoptimizing the design potentialof site whilst meeting allstatutory requirements and

1042 2012 P & T Architects & Engineers Ltd Board View Court Lot No. 435, Sham Wan Road, Aberdeen,Hong Kong IL 435 BD 3004/1 29 June 2000 (OP)

To discuss the advantage anddisadvantage of case studybeing deviated fromconventional contract.

1043 2012 Aedas Ltd Proposed A&A Works at the Ruttonjee Centre 11 Duddell Street, Central, Hong Kong IL 669 & IL 30 sCRP & sA &IL 644 sA BD 2-3/1192/79/3 13 January 2006

How the Architect tackle withthe M&E and structural issuesfor existing building likeRuttonjee Centre whileinstallation of new M&E itemsand new structuralarrangement in the renovation

1044 2012 David S.K. Au & Associates Ltd Extension & Renovation Works for Eu Yan Sang (HK)Limited Yuen Long Industrial Estate Lot No 313, Subsection 2 of

Section H BD 2/9039/05 June 2006 Effective communication asan aid of construction

1045 2012 P & T Architects & Engineers Ltd The Construction of a primary school in Sham Tseng,Tsuen Wan

TW452, 37 Castle Peak Road, ShamTseng, Tsuen Wan TW 452

ASD ConsultancyAgreement No. 9 AM011

May 2008

The issue of projectsuspension and the change ofproject brief subsequentlyafter the recommencement ofthe project.

1046 2012 Ronald Lu & Partners (HK) LtdA 24-classroom primary school (school A) atdevelopment near Choi Wan Road and Jordan Valley,Kwun Tong

80 Choi Ha Road, Jordan Valley, KwunTong GLA NK 730

ASD55/92050/CWO/002-07/BP

August 2009

Evaluation on theinconsistency between thecontract documents and thedrawings found in this projectsuch that a greatunderestimation of thequantities and cost in the

1047 2012 Ronald Lu & Partners (HK) Ltd HKU SPACE Po Leung Kuk Community College 66 Leighton Road, Causeway Bay, HongKong IL 9011 BD 3053/02 May 2008 (OP) ; June

2008 (PC)DH order of existing masonrywall.

1048 2012 Aedas Ltd 18 Kowloon East - Po Hing Centre Redevelopment 18 Wang Chiu Road, Kowloon Bay,Kowloon NKIL 5856 07837/E4/650 19 January 2011

Investigation of possibility ofproviding sustainable designin the project

1049 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Belair Mount 3 Ma Sik Road, Fanling, New Territories FSSTL 126, Area 9 BD 2/9003/95 1999 Implication of lease of the lot(ie provision of bridge)

1050 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Ocean Pointe 8 Sham Tsz Street, Sham Tseng, TsuenWan, New Territories Lot 265 in DD 390 BD 2-4/9184/96(2) 2000

Client's requested tall rooffeature caused concerns fromthe BD

1051 2012 Wong Tung & Partners Ltd Tseung Kwan O - TL No. 55, Ocean Shores TKOTL 55, Tseung Kwan O, 88 O KingRoad, New Territories TKOTL 55 BD 2/9156/97 31 October 2003 Explore the Architect's

solution in overcoming site

1052 2012 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road KIL 3389 RP BD 4049/00 April 2006 How architect responded tosite and design constraints?

1053 2012 Wong Tung & Partners Ltd Tong Yan San Tsuen Lot No. 2131 in DD 121 (Site B), YuenLong Lot No. 2131 BD 9014/04 June 2012 How does architect

responded to confined site

1054 2012 WCWP International Ltd Proposed Residential Redevelopment IL 8982, VictoriaRoad, Kennedy Town 86 Victoria Road, Kennedy Town IL 8982 BD 2/2025/03 18 June 2009 (OP)

Exploration of theenvironmental factorsdetermining Architectural

1055 2012 Eddie Chan Architects Ltd A&A Works for composite building at 53 CarnarvonRoad, Tsim Sha Tsui 53 Carnarvon Road, Tsim Sha Tsui KIL 8261 2-3/657k in 1/47/2 2 April 2011 (PC) Adaptive reuse VIA alteration

and addition works.

1056 2012 Foster + Partners Cathay Pacific Lounges (Phase 2) Level 7, Terminal 1, Hong KongInternational Airport CLK Lot No. 1 BD 2-3/9702/94/183 February 2012 Fire Engineering Approach.

1057 2012 Foster + Partners Tai Po Luxury Residential TPTL 188 Tak Shek Kok, Tai Po, New Territories TPTL 188 BD 2/9056 September 2012 (OP) ;December 2012 (PC) GRC Prefabricated Façade

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1058 2012 Barrie Ho Architecture Interiors Ltd Private Residence at 5 Moorsom Drive, Jardine'sLookout, Hong Kong

5 Moorsom Drive, Jardine's Lookout,Hong Kong Section O of IL 7863 BD 3/3009/04 March 2009

How does architet mediateamong different parties toresolve complaints and siteissues during construction?

1059 2012 Integrated Design Associates Ltd New Heliport at Hong Kong - Macau Ferry TerminalInner Pier, HK-Macau Ferry Terminal,Shun Tak Centre, 200 Connaught Road,Central, Hong Kong

NHX-376 BD 22-3/2047/07 June 2009

Overcoming design andstructural difficultiesencountered to suit uniquebuilding typologies.

1060 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Building at 712 Prince Edward RoadEast, San Po Kong

712 Prince Edward Road East, San PoKong, Kowloon NKIL 4795 BD 4084/05 January 2009 Role of architect in this project

compared to common

1061 2012 D. Heung & Associates Architects & Engineers Ltd Proposed Extension of Evangel Children's Home atNKIL 4498

120 Shatin Pass Road, Wong Tai Shin,Kowloon NKIL 488 BD 2/4054/90 August 2012

Architect solution to sitemanagement, cost controland co-ordination.

1062 2012 Wong & Ouyang (HK) Ltd HK Sanatorium & Hospital Phase 3 Redevelopment 2 Village Road, Happy Valley, Hong Kong IL 1702 & ext and IL 3284 BD 2/3027/03 April 2008 Curtain wall system.

1063 2012 Aedas Ltd Residential Development at RBL 240 Sec A, 6 StanleyBeach Road, Stanley, Hong Kong 6 Stanley Beach Road RBL 240 Sec A BD 2013/07 6 August 2010

How the architect resolvedthe site constraint by planningsolution, which comprise of acomprehensive study on thesection 16 submission of thisproject.

1064 2012 CYS Associates (HK) Ltd The Oakhill 28 Wood RoadIl 1337 sAss1, sAss2, sAss3,sAss4, sAss5, sAss6, sARP,sBss1 & sBRP

BD 3013/05 30 June 2011How does the architectmanage to deal with therevised brief initiated by

1065 2012 MLA Architects (HK) Ltd Concordia Lutheran School 12 Tai Hang Tung Road, Sham Shui Po,Kowloon NKIL 3933 BD 4037/07 February 2011

Architect's strategy to meetthe latest statutory andoperational requirements.

1066 2012 Spence Robinson LtdConstruction of Open Niches at Terrace 2, 3 and 4 ofSection 35 Chinese Permanent Cemetery, CapeCollinson

Chinese Permanent Cemetery, CapeCollinson Road, Hong Kong IL 7715 RP and ext BD 3013/09 May 2012

Supplementary AgreementNo. 1 between the client andmain contractor.

1067 2012 Andrew Lee King Fun & Associates Architects Ltd Development of Centralized General Research LabComplex

Block 1 at Area 39, Pak Shek Kok, TheChinese University of Hong Kong, Shatin,New Territories

STTL 437 and ext thereto BD 2/9073/08(P) 18 January 2012 HK BEAM Plus / SustainableDesign

1068 2012 Ie, Siu & Chung Architects Ltd Proposed Commercial Building at KL 3951 21C Soy Street, Mongkok, Kowloon KIL 3951 BD 3/4031/08 15 August 2011 Design strategies for compactsites.

1069 2012 Wong Tung & Partners Ltd East Cityplaza Site VC QBML & ext BD 2/3049/93 July 2009Elevation Design in relation tostatutory and contractualconstraints.

1070 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Hotel Development at 19-23 Austin Avenue,Tsim Sha Tsui, Kowloon

19-23 Austin Avenue, Tsim Sha Tsui,Kowloon KIL 9786 BD 2/4033/07 9 August 2012 Architect's solution in relate to

Site Constraint.

1071 2012 LWK & Partners (HK) Ltd Tiu Keng Leng Station Property Development (Site A) Area 73B, NT Site A TKOTL 73 BD 2-3/7200/98/3 February 2011 How to cooperate with MTRCorporation?

1072 2012 P & T Architects & Engineers Ltd Residential Redevelopment at STTL 467, Tai Po Road,Shatin Height, Shatin, New Territories

Tai Po Road, Shatin Height, Shatin, NewTerritories STTL 467 BD 9016/07 17 July 2009

Architect's Solution for DesignChange Initiated by Client andImpacts Therewith.

1073 2012 P & T Architects & Engineers Ltd Tai Kok Tsui Development Site C - Residential Hoi Fai Road, Tai Kok Tsui, Kowloon KIL 11074 BD 2/7331/96-3 4 May 2000 Re-phrase the flat mix ofresidential development.

1074 2012 P & T Architects & Engineers Ltd Residential Development at Lo Fai Road, Tai Po Lot117

Tai Po Town, Lot 117, Lo Fai Road, TaiPo, New Territories TPTL 117 BD 2/9055/96 March 1999

The Solution of How theArchitect Transforms theLease Condition (Platform A,B and C into the ArchitecturalPlanning and Design).

1075 2012 P & T Architects & Engineers Ltd KIL 11074 Olympic Station Development - Site C Olympic Station Development Site C KIL 11074 BD 2/7331/96 Pt.V August 2000 Phasing and Programme

1076 2012 Ie, Siu & Chung Architects Ltd Proposed Residential Redevelopment 148-148A Boundary Street, Kowloon KIL 2097 sGss 1 RP & sGss1sA BD 2/4058/06 10 November 2010

To handle the negotiationbetween client and maincontractor, as the long timepart the payment delay afterAP issued the payment

1077 2012 Ronald Lu & Partners (HK) Ltd ISF Academy Phase II 2B New West Extension Over aCarpark

1 Kong Sin Wan Road, Pokfulam, HongKong IL 8995 BD 2/2023/03(P) Substantial completion on

10 August 2011

Delay of Master ProgrammeCriteria and Actions for EOTApproval.

1078 2012 Ronald Lu & Partners (HK) Ltd Public Transport Interchange (PTI) & PropertyDevelopment Enabling Works at Wu Kai Sha Station Wu Kai Sha Station of Ma On Shan Rail STTL 530 BD 2-3/7947/01 26 November 2004 Property development

enabling works.

1079 2012 Ronald Lu & Partners (HK) Ltd Sheung Kung Hui Tsang Shiu Tim Secondary School(S327) Wo Che Estate, Shatin, New Territories HA VO103 Plan No STM

6154A June 2005

The choice of constructionmethod and sequence inrelation to the operation ofexisting school.

1080 2012 Ronald Lu & Partners (HK) Ltd Proposed Comprehensive Redevelopment of KMBDepot 1 Po Lun Street, Lai Chi Kok, Kowloon NKML 3 BD 2/4010/01 December 2006

CDA site with old lease ;procedure of section 16 andnegotiation of planningconditions.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1081 2012 P & T Architects & Engineers Ltd The Redevelopment of St. Stephen's Girls PrimarySchool 33 Park Road, Hong Kong GLA-HK 882 March 2009 How to utilize the limited

budget and time?

1082 2012 Ronald Lu & Partners (HK) Ltd Residential Development at STTL No. 82 52 Ma Lok Path, Kau To Shan, Shatin(Double Heaven) STTL 82 BD 2/9230/95 June 2002 (OP) ; 11 May

2002 (PC)

Influence of economicalcondition on design andconstruction matter.

1083 2012 Aedas Ltd Residential Development at 350 Tai Hang Road 350 Tai Hang Road, Hong Kong IL 7350 BD 3002/06 23 March 2012

The considerations andprocedures that can guranteethe transformation from asingle-tenant house into amulti-tenant low-riseresidential building with anadditional floor, which is

1084 2012 Ronald Lu & Partners (HK) Ltd The Merton, Residential Redevelopment at IL 8971 Kennedy Town, Hong Kong IL 8971Site A: BD2/2015/99H(P) ; SiteB: BD 2/2022/99H(P)

25 May 2005 (Site A) ; 5November 2004 (Site B)

Architect solution to projectdelay and extension of timearrangement.

1085 2012 Foster + Partners Tai Po Pak Shek Kok Lot 187 Residential Development(The Graces, Providence Bay, 天賦海灣)

Pak Shek Kok, Phase 1, Site A, Tai Po,TPTL 186 TPTL 187 BD 2/9055/07 August 2012 (OP) ;

September 2012 (PC)Architects' solutions toprecast GRC façade design.

1086 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd URA K-11 Development Kowloon Inland Lot No 11188(The Masterpiece)

18 Hanoi Road, URA Project at KIL11188, Tsim Sha Tsui, Kowloon KIL 11188 BD 2/4031/00 February 2009 Spcial difficulties and

constraints

1087 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Residential Development Project at Ma On Shan Hang Tai Road and Yuk Tai Street, Area77, Ma On Shan STTL 448 BD 2/9251/96H(P) 31 August 2001 Land lease conditions.

1088 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd N1235 Tuen Mun Area 5B, Tsun Wen Road, NewTerritories Tsun Wen Road DD 131 Lots 445 & 463 BD 2/9205/94(1) September 2000

Publicinterest/benefit/commentaffect the new developmentproject - S16 ; APP 151 & 152

1089 2012 Aedas Ltd Proposed New Building, Caine Road, Hong Kong 38-44 Caine Road, Hong KongIL 150 sAss4 sAss, ss4sB,sAss4RP, sAss5, sARP &sAss1RP

July 2012

Discuss the issues that werederived from the insistence ofa clean, modern spectacularfaçade.

1090 2012 Ronald Lu & Partners (HK) Ltd New Clubhouse for Ladies Recreation Club 10 Old Peak Road, Hong Kong IL 6375 RP BD 2/2027/01 4 September 2006 Club licensing issues

1091 2012 Barrie Ho Architecture Interiors Ltd Headquarters of the Hon Kong Federation of Women Beneath Canal Road Flyover, 435Lockhard Road, Hong Kong 1. NHX-638 ; 2. EHX-425 BD 2/3041/08(TB)

1. NHX-638: November2010 ; 2. EHX-425:November 2010

How architect responded tosite constraints?

1092 2012 Hsin Yieh Architects & Engineers Ltd 23 Tai Hang Drive 23 Tai Hang Drive IL 8972 BD 2/3034/00 24 November 2006 (OP) ;March 2007 (PC) Contract Administration

1093 2012 Simon Kwan Architect & Associates Ltd Hong Kong Science Park Phase 2 - Building 20 Hong Kong Science Park Phase 2 -Building 20 at Pak Shek Kok, Tai Po TPTL 182 BD 2/9083/03(3)(P) 12 May 2011 Sustainability Study

1094 2012 Hsin Yieh Architects & Engineers Ltd Industrial Redevelopment TWIL 36 and TWIL 218 Hoi Shing Road, Tsuen Wan, Hong Kong TWIL 36 & TWTL 218 BD 2/9111/03 (Pt. II) June 2012

How management control ofan architect solves problemwith different constraints tofulfill client design

1095 2012 Rocco Design Architects Ltd A Primary School at Cheung Sha Wan Road, ShamShui Po, Kowloon

Cheung Sha Wan Road, Sham Shui Po,Kowloon GLA-NK 692

ASD104/6529/SSM313/C25/001 Program No310 EP

31 July 2005Design variation in earlyconstruction stage caused bynew planned bus lay-by.

1096 2012 Andrew Lee King Fun & Associates Architects Ltd Residential Development 8 Cho Yuen Street, Yau Tong SA of YTIL 38 & RP of YTIL BD 2/4068/4 2 March 2009

1097 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Hong Kong Government Tai Po Complex 8 Heung Sze Wui Street, Tai Po Area 1 ASD52/4741/RC/RCC/001 December 2003

How the project team took onchallenges of projectmanagement and designcriteria, and then transformedthe project into a unique stateof the art of market complexbuilding type that would bestenhance the quality of life ofthe community as a whole.

1098 2012 Simon Kwan Architect & Associates Ltd Ma Wan Island Residential Development - Phase 5 8 Pak Lai Road, Ma Wan, New Territories MWIL 392 BD 9160/97H(6) June 2006 (OP) Modification of approved

1099 2012 Brighspect Limited Proposed Redevelopment at 31-35A Wellington Street 31-35A Wellington Street, Central, HongKong

IL 21 sCss1, sCRP, sBRP,sARP BD 2/2013/05 May 2007 Building and structural layout.

1100 2012 Aedas Ltd Additional one storey on top of the flat roof area of AsiaSatellite Earth Station

15 Dai Kwai Street, Tai Po IndustrialEstate, Tai Po, New Territories TPTL 13 sGRP & ext thereto BD 2/9198/10 15 March 2012 Structure system connecting

the new and the old.

1101 2012 P & T Architects & Engineers Ltd Residential Redevelopment 7-9 Mount Kellett Road, The Peak RBL 729 & 732 BD 2/2038/08 February 2012How the developmentpotential of a unclassified siteto be determined.

1102 2012 P & T Architects & Engineers LtdProposed Hotel Development at Sha Tin Town Lot No.347 Junction of On Lai Street and On Ping Street,Shatin, New Territories

J/O On Ping Street and On Lai Street,Shatin, New Territories STTL 347 BD 2/9042/09 June 2012

The difficulties arose in theprocess and resolution by thearchitect.

1103 2012 Hsin Yieh Architects & Engineers Ltd Composite Development - Tsuen Wan Town Lot 394 18 Yeung Uk Road, Tsuen Wan, NewTerritories TWTL 394 BD 9061/98H(P) 22 January 2009 Statutory Control and

submission.

1104 2012 Design 2 (HK) Ltd An 18-Classroom Primary School at Tai Pak Tin Street,Kwai Chung, New Territories

99 Tai Pak Tin Street, Kwai Chung, NewTerritories GLA-KT 1159 ASD programme no.

307 EP 18 August 2009How the site constraintsaffected the final design of theproject.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1105 2012 Aedas Ltd Proposed A&A Works No. 162 Nga Tsin Wai Road,Kowloon 162 Nga Tsin Wai Road, Kowloon NKIL 3537 BD 2-3/4610/61 March 2012 A balance between an old

building and new regulations.

1106 2012 Aedas Ltd Tung Chung Cable Car Project Tung Chung Terminal, Ngong Ping Road,Lantau Lot No. 238 BD 2/9905/03 (TCT)

(P) (Pt.II) 6 April 2006Positive or negative impact ondesign and build contract withtarget price.

1107 2012 Llewelyn-Davies (HK) Ltd The proposed alteration and addition works for ESF -Shatin Junior School

3A Lai Wo Lane, Fo Tan, Shatin, NewTerritories STTL 234

BD 2-3/9051/85/2 ;BD 2/9260/10 ; BD 2-3/9008/99

August 2012

1108 2012 WMKY Ltd Singapore International School Secondary Campus andLink-Bridge to Primary School Campus

2 Police School Road, Aberdeen, HongKong AIL 386 BD 2/2056/08 August 2011

Construction administrationprocess and details for theexisting secondary school tobe partly demolished, partlyretained and renovated.

1109 2012 Aedas Ltd Alterations and Additions Works to Existing UniversityLibrary, The Chinese University of Hong Kong

Central Campus, The Chinese Universityof Hong Kong, Shatin

STTL 437 RP & the extthereto BD 2/9010/09 31 May 2012 Phasing of the project.

1110 2012 AGC Design Ltd Redevelopment of Sawtow Christian Church, KowloonCity

39 Grampian Road, Kowloon City,Kowloon NKIL 1587 sA BD 2/4084/06 13 June 2011 (OP) ; July

2011 (PC)

Rezoning Application from 5storeys (under OZP) to 9storeys.

1111 2012 Wong Tung & Partners Ltd Proposed Residential Development at KIL 11073 1 Yau Cheung Road, South WestKowloon KIL 11073 BD 4054/07 July 2012 (Anticipated)

How do architects cope withtight construction programmeand uncertain matters subjectto government departmentapproval?

1112 2012 Ronald Lu & Partners (HK) Ltd School Improvement Programme Po Leung Kuk LeeShing Pik College (S308) 12-20 On Yin Street, Tsuen Wan TWTL 283 BD 3024/02(P) April 2005 (OP) ;

September 2005 (PC) Project Team Organization

1113 2012 Ronald Lu & Partners (HK) Ltd Tai Kok Tsui Complex (Phase 2) 63 Fuk Tsun Street, Tai Kok Tsui,Kowloon N/A SSK 313 2005

Special Treatment on WetMarket Under the Outbreak ofH5N1 in 2003.

1114 2012 Ronald Lu & Partners (HK) Ltd Proposed Residential Development at Ping Shan Ping Shan, Yuen Long, New Territories Lot No 2051 BD 2/9162/01 November 2003To maximize the developmentpotential by application formodification.

1115 2012 Wong & Ouyang (HK) Ltd Villa Esplanada, Residential Development TYTL 129, Nga Ying Chau, Tsing Yi TYTL 129 BD 2/9123/95 15 July 1999

Comparison between theallowed GFA concession in1998 and the current allowedGFA concession under thenewly introduced SBD guidedin year 2011.

1116 2012 Ronald Lu & Partners (HK) Ltd SIP / PLK Mr. & Mrs. Chan Pak Keung Tsing Yi School 2 Tsing Chin Street, Tsing Yi KT 1068 BD 3071/02(P) April 2005 Compliance of BFA:Constraint & Solution.

1117 2012 Rocco Design Architects Ltd Redevelopment of 31 Queen's Road, Central 31 Queen's Road, Central, Hong Kong IL 2316 BD 2/2056/05 December 2011 (OP)Lease, deed of dedication &TOP ; Application, Statutory &Contractual Implication.

1118 2012 Rocco Design Architects Ltd Exchange Tower (1647) Junction of Sheung Yuet Road and WangChiu Road, Kowloon Bay NKIL 6310 BD 2/4016/05 (Pt IV) 26 September 2008 Ecological innovations in

commercial development.

1119 2012 Aedas Ltd Refurbishment of BEA Building 314-324 Hennessy Road, Wanchai, HongKong ML 122 RP & SD BD 2-3/3299 January 2008 (OP) ; April

2008 (PC)

The GFA and site coveragecalculation of such greenfeatures and projection overstreet will be discussed.

1120 2012 Aedas Ltd Tseung Kwan O Primary & Secondary School Area 65, Tseung Kwan O ASD92/92050/CWO/008- August 2006 Time and cost management.

1121 2012 Aedas Ltd Alexandra House, Podium Refurbishment 7-15 Des Voeux Road, Central IL 1724 & 1725 BD 2-3/2442/72/25 November 2003 Dedication of arcade to publicpassageway.

1122 2012 Aedas Ltd Yau Kom Tau Yau Hom Tau, Castle Peak Road, TsuenWan TWTL 367 BD 2/9149/04 29 June 2009

How the architect on the onehand fulfilling the designrequirement as a "luxuryhousing", while on the otherhand, maximize thedevelopment potential, as theclient expected.

1123 2012 Ronald Lu & Partners (HK) Ltd School Improvement Programme, Final Phase,Package 4 - Chinese YMCA College

Area 86, Heng On Shan, Shatin, NewTerritories STTL 500 sA

ASD053/6487/ALL318/C25/001

25 November 2004How does the architectchoose a design option andhis solution to design brief.

1124 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Royal Ascot (Phase 1), Hong Kong Ho Tung Lau, KCR Depot, Sha Tin STTL 411, KCRL/5 BD 2/9143/90 1995 MLP Planning

1125 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Hong Kong SKH St. Philip Church 9 Tin To Street, Tin Shui Wai, Yuen Long,New Territories 2000

How could architect designwith site constraining withclients requirements andbudget control.

1126 2012 Aedas Ltd Back of House Building for Marine Mammal Ocean Park, 180 Wong Chuk Hang Road,Hong Kong RBL 1020 & ext thereto BD 3/2012/06(P) November 2008

What is the architect's rolewhen problems occur relatingto the contract basis.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1127 2012 ARCA Ltd 10 Bowen Road, Hong Kong 10 Bowen Road, Hong Kong IL 6875 BD 2/2029/01 8 February 2012 Determination of GFA andPlot ratio for the pre-war site.

1128 2012 Archiplus International (HK) Ltd Proposed A&A works at Wong Tai Sin Shopping Centre Lower Wong Tai Sin Estate, Lung CheungRoad, Kowloon KIL 6438 BD 22-3/4089/06 September 2010 Fire Services for Realizing

A&A Design Solution.

1129 2012 Charles M.H. Wong Architect & Associates Ltd Proposed composited building 164A Prince Edward Road West,Mongkok

KIL 2357 sAss1 RP & KIL2357 sAss1 RP & sAss 1 sB BD 2/4081/05 28 July 2009

Study and evaluated how thedesign was driven bymaximizing profit for client.

1130 2012 Charles M.H. Wong Architect & Associates Ltd Proposed composited Building 201-203 Castle Peak Road NKIL 2789 sBRP & sC BD 2/4083/95 16 June 2006 How finance affects program.

1131 2012 Andrew Lee King Fun & Associates Architects Ltd Best Western Hotel Harbour View 239-251 Queen's Road West, Hong Kong IL 1247 sAss1 - ss3, sARP,IL 1247 sB, sCRP, sDRP BD 2008/08 22 February 2012 Extension of site during

construction.

1132 2012 Architecture Design & Research Group Ltd Hong Kong Polytechnic University, Phase 8Development

J/O Chatham Road and PrincessMargaret Road KIL 11201 BD 1/4025/08 August 2012 (Phase 1) Phase Occupation Permit.

1133 2012 Vincent Lai Architects Ltd 3-Storey Warehouse Building Tong Yan San Tsuen, Yuen Long, NewTerritories Lot No 2148 in DD 21 BD 2/9189/08 25 August 2011 Lease modification from

agricultural to industrial use.

1134 2012 LWK & Partners (HK) Ltd Residential Building at 12-16 Tai Tam Road, HongKong 12-16 Tai Tam Road, Hong Kong RBL 441 sA & ext RP & ext BD 3049/97 July 2000

How architectural designresponds to planningrestrictions and site

1135 2012 LWK & Partners (HK) Ltd Residential Development 71 Mount Kellett Road, Hong Kong RBL 506 BD 202 BC/97 November 2002 The criteria and selections foremploying good contractors.

1136 2012 Architecture Design & Research Group Ltd Redevelopment of Creative Kindergarten at 6 RutlandQuadrant, Kowloon 6 Rutland Quadrant, Kowloon NKIL 812 BD 2/4010/05 15 March 2007 Section 16 Application.

1137 2012 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Development 38 Heung Yip Road, Hong Kong AIL 344 BD 2/2008/06 4 September 2012The role and responsibility ofarchitect in the managementof building construction

1138 2012 AGC Design Ltd Revitalization of Lui Seng Chun as the Hong KongBaptist University Chinese Medicine and Healthcare 119 Lai Chi Kok Road, Mongkok, Kowloon GLA-K 424 BD 22-3/3024/09(HU) 1 March 2012 Conservation Vs New

Building Regulation1139 2012 LWK & Partners (HK) Ltd Liberte (Residential Development) 833 Lai Chi Kok Road, Kowloon NKIL 6328 BD 4030/99 H 20 August 2003 Connection to the MTR

1140 2012 P & T Architects & Engineers LtdThe Construction of a special school for severelymentally handicapped children in Area 32, Tin ShuiWai, New Territories

28 Nam Shan Chuen Road, Tai HangTung, Kowloon NKIL 5986 ASD 102/6357 22 May 2007 Universal accessibility

1141 2012 Gravity Partnership Ltd Cathy Lodge 125 Wan Chai Road, Hong Kong IL 611 and IL 662 BD 2/3032/98 21 June 2001

Focus on the biggestchallenge for this kind ofredevelopment project duringthe demolition stage for itdemands special attention

1142 2012 Gravity Partnership Ltd Proposed Hotel Development 2-12 Shelter Street IL 1149 BD 2/3009/97 (Pt 2) 23 November 2000How does precastconstruction system posespositive impact on sustainable

1143 2012 Gravity Partnership Ltd Proposed New 300 Student Hostel DevelopmentUniversity Avenue, The ChineseUniversity of Hong Kong, Shatin, NewTerritories

STTL 437 RP & the extthereto BD 2/9151/06 October 2011

How have the Architectaddressed differentchallenges during differentstages of the development?

1144 2012 Barrie Ho Architecture Interiors Ltd Redevelopment of NKIL 5120 and 5121, 50-52 LionRock Road, Kowloon 50-52 Lion Rock Road, Kowloon NKIL 5120 and 5121 BD 2/4042/06 27 April 2011

Implication on the newstatutory requirement to thesame development.

1145 2012 CYS Associates (HK) Ltd Residential Development at 118-122 Tung Lo WanRoad

118-122 Tung Lo Wan Road, CausewayBay, Hong Kong Section A of IL 1680 BD 3008/05 13 May 2008 (OP) ; June

2008 (PC)Incompetent Curtain WallNSC

1146 2012 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd PSPS Tsing King Road (TYTL 163) Tsing King Road, Tsing Yi, New

Territories TYTL 163 BD 2/9042/00H March 2003The special role of theArchitect within this designand build structure will also be

1147 2012 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Alteration and Addition Works at 7 Connaught RoadWest and 13 New Market Street

7 Connaught Road West and 13 NewMarket Street, Hong Kong ML 423 RP BD 2-3/2427/71 19 December 2011

The recycling aspects of abuilding designed for anearlier era.

1148 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Hotel Development at 388 Jaffe Road,Wanchai, Hong Kong 388 Jaffe Road, Wanchai, Hong Kong ML 436 sARP BD 2/3626/6

Target OP date: 13 July2012 ; Target PracticalCompletion: November

Management of the FireIncident during theconstruction period.

1149 2012 P & T Architects & Engineers Ltd Proposed residential redevelopment at RBL 1100, 1, 3and 5 Gough Hill Road, The Peak, Hong Kong

1, 3 and 5 Gough Hill Road, The Peak,Hong Kong RBL 1100 BD 2/2025/05 29 March 2012

Interface between sub-structure and super-structure,extension of time.

1150 2012 Aedas Ltd A&A Works to G/F, M/F, 2-5/F and R/F of 54-56 RussellStreet 54-56 Russell Street, Causeway Bay IL 3590 RP and IL 3591 RP BD 2-3/3211/69/5 March 2011 A project without main

contractor

1151 2012 WCWP International Ltd Hotel at IL 8774, 133 Leighton Road, Causeway Bay,Hong Kong - "Lanson Place Hotel"

133 Leighton Road, Causeway Bay, HongKong IL 8774 BD 2-3/3063/97/2 13 December 2005

Architect's approaches:Striking a balance among costcontrol, statutory requirementand building performance.

1152 2012 Woods Bagot Asia Ltd Commercial Building at Hoi Ping Road 1-3 Hoi Ping Road, Hong Kong IL 29 sHRP and sHss1RP BD 2/3017/06 October 2010 Design and engineering of thefaçade.

1153 2012 WCWP International Ltd SIP Final Phase - Package 1 St. Paul's Convent School 140 Leighton Road, Causeway Bay IL 1080 BD 2/3083/01(P) 25 June 2005

Minimize disturbance tosurroundings duringconstruction in dense andcomplex site.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1154 2012 WCWP International Ltd Providence Bay Phase 1 - Proposed ResidentialDevelopment

Pak Shek Kok Development Area, Phase1, Site B, Tai Po, New Territories TPTL 186 BD 2/9172/07 July 2012 (OP) ;

September 2012 (PC)

The avoidable consequencesof construction stage and finaloutcome of the project.

1155 2012 RDL Asia Ltd Proposed Commercial Building 487-489 Lockhart Road IL 2836 sAss8 and ss4 BD 3002/05 August 2008The existing staircases arecut in half size and retained atadjoining site during

1156 2012 LWK & Partners (HK) Ltd Proposed Residential Development at Headland Road 11-12 Headland Road, Repulse Bay,Hong Kong RBL 1163 BD 2/2030/06

17 July 2009, 27 October2009 and 22 October 2009(OP) ; August 2010 (PC)

Lease modification

1157 2012 P & T Architects & Engineers Ltd 3-5 Plunkett's Road, The Peak, Hong Kong, RBL 647 3-5 Plunkett's Road, The Peak, Hong RBL 647 BD 2024/04 April 2008 Sustainability design

1158 2012 Seniorman Design Ltd The Satellite Remote Sensing Ground ReceivingStation Phase II

The Chinese University of Hong Kong,Shatin, New Territories

STTL 437 RP & the extthereto BD 2/9062/06 3 December 2009

Construction procedure andEVA of fire service due to siteconstrain.

1159 2012 Kohn Pederson Fox (HK) Kerry Centre 865 King's Road, Quarry Bay, Hong Kong IL 9021, formerly 7737, 8637 BD 2/3007/06 September 2010 (OP) ;December 2010 (PC)

Fire engineer and implicationon project management.

1160 2012 Wong Tung & Partners Ltd Olympic Station Development - Site B, Phase I & III Junction of Cherry Street and Hoi WangRoad, Tai Kok Tsui KIL 11090 BD 2/7339/97 March 2002 How architect responded to

the noise impact issue of the

1161 2012 Wong Tung & Partners Ltd Comprehensive Hotel, Tseung Kwan O, Area 56(Phase 3)

3 Tong Tak Street, Tseung Kwan O, NewTerritories TKOTL 72 BD 2/7196/98(2) 17 January 2012 (Phase

3) - OP

The importance of earlydesign co-ordinationassociating with the control of

1162 2012 Wong Tung & Partners Ltd Residential Development at AIL 451, Welfare Road,Aberdeen, Hong Kong

AIL 451, Welfare Road, Aberdeen, HongKong AIL 451 BD 2/2079/07 April 2012

Designing with environmentalfriendly features for aresidential project.

1163 2012 Aedas Ltd Sky Plaza - North Office Tower Hong Kong International Airport, Chek LapKok

CLK Lot No. 1 RP & extthereto BD 2/9062/03(3)(9) October 2006

The change requested by theclient during the early stagesof construction whereby theroof was transformed from amaintenance access zone toa public viewing deck.

1164 2012 Aedas Ltd A&A Works of Olympian City II Olympian City II, 18 Hoi Ting Road, WestKowloon, Hong Kong KIL 11090 BD 2-3/7339/97-1/8 May 2011 Construction in Phases

1165 2012 Thomas Chow Architects Ltd Proposed IB Block at Diocesan Boys' School 131 Argyle Street, Kowloon KIL 6737 BD 3/4073/08 December 2011 Site arrangement andmobilization during

1166 2012 Aedas Ltd Sunny Bay Station Lantau Island, New Territories

As gazetted by MTRCL, onland between Yam O andPenny Bay Reclaimation inNorth Lantau Island

N/A 1 August 2005 (PC)

Unusal Project ManagementPractice: Special TeamWorking together with in-teamprofessionals and specialists.

1167 2012 David S.K. Au & Associates Ltd Proposed Pat Chun Food Factory 18 Chun Wang Street, Tseung Kwan OIndustrial Estate, New Territories TKOTL 39 s3sQ BD 9083/08 March 2011

1168 2012 Ronald Lu & Partners (HK) Ltd Proposed Property Development at STTL 530, Ma OnShan, Shatin, New Territories

599 Sai Sha Road, Ma On Shan, NewTerritories STTL 530 BD 2/7990/05 June 2009 (OP) ;

September 2009 (PC)

Incovportion of as-builtdevelopment enabling worksand client's need.

1169 2012 Hsin Yieh Architects & Engineers Ltd Tai Wai Festival City Phase 2 1 Mei Tin Road, Tai Wai, New Territories STTL 529 BD 2/7897/99/2 November 2010 Noise Barrier.

1170 2012 Wong Tung & Partners Ltd Cyberport Development (Stage 4) 100 Cyberport Road, Pokfulam, HongKong IL 8969 RP BD 2/2042/99/ST4

Stage 4a: July 2002 (OP) ;August 2002 (PC) ; Stage4b: December 2002 (OP) ;December 2002 (PC)

How the architect proposepassageway of vehicularcirculations to alleviate thetraffic impact within this virginland development, of whichalso serving as EmergencyVehicular Access to fulfill therequirement of Planning

1171 2012 P & T Architects & Engineers Ltd Crocodile Centre 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 2/4002/06 25 September 2009 Façade design and regulation1172 2012 P & T Architects & Engineers Ltd 1 Tai Yau Street, San Po Kong (Midas Plaza) 1 Tai Yau Street, San Po Kong, Kowloon sARP of NKIL 4455 BD 2/4010/95 28 December 2007 Special Design Constraints.

1173 2012 Andrew Lee King Fun & Associates Architects Ltd King Palace Plaza 55 King Yip Street and 24 Hing Yip Street,Kwun Tong, Kowloon KTIL 697 BD 2/4055/08 2 Feburary 2012

An evaluation of project teamand building procurementdeviating from commonpractice.

1174 2012 Leigh & Orange Ltd Princess Alexandra Red Cross Residential School 8-9 Rehab Path, Kwun Tong, Kowloon NKIL 5775 and STT KX 1499 BD 3045/02(P) June 2004 Tendering programme andproject management.

1175 2012 Leigh & Orange Ltd ASD School Improvement Programme Kei ChiSecondary School 20 Shui Ning Road, Kwun Tong, Kowloon KTIL 507 ASD 402/95062/PH

IV/P2 13 September 2004 Mitigation of constructionnoise.

1176 2012 Leigh & Orange Ltd School Improvement Programme Ling To CatholicPrimary School Phase IV Package Two

Chun Man Court, Homantin, Kowloon, VO16-18 N/A N/A 9 July 2004

To study on how to managethe constraints & measures tominimize the impact ofconstruction on the existingschool operation in terms ofsafety, air pollution & noise

1177 2012 Chau Ku & Leung Architects & Engineers Ltd URA K32, KIL 11192 Beech Street / Ivy Street / PineStreet / Anchor Street, Tai Kok Tsui, Kowloon 88 Beech Street, Mongkok District KIL 11192 BD 3/4073/06 14 August 2012 (OP)

Architect's role in solvingstreet improvement worklocated outside and

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1178 2012 Aedas Ltd Redevelopment of 3 Connaught Road Central 3 Connaught Road Central, Central, HongKong IL 8736 BD 2/2006/07 30 September 2012

(Expected OP date) MTR Subway sub-contract.

1179 2012 Aedas Ltd A&A Works at Nexxus Building, 41 Connaught RoadCentral 41 Connaught Road Central ML 382 BD 2-3/2333/59/3 1 November 2008

Implementation ofmanagement building contractwith pros and cons.

1180 2012 Leigh & Orange Ltd Thrill Mountain 180 Wong Chuk Hang Road, Brick Hill,Aberdeen, Hong Kong RBL 1020 & ext thereto

BD 2/2028/08(P) -TM1 ; BD2/2028/08/2(P) - TM2; BD 2/2028/08/3(P) -TM3 ; BD2/2032/06/3(P) - TM4

August 2011 - TM1 ;November 2011 - TM2 ;November 2011 (TM3) ;September 2010 (TM4)

Phase development.

1181 2012 Leigh & Orange Ltd Polar Adventure, Summit, Ocean Park 180 Wong Chuk Hang Road, Brick Hill,Aberdeen, Hong Kong RBL 1020 & ext thereto BD 2/2059/07(P) and

BD 2/2059/07/1(P)

BD 2/2059/07(P) - 1 June2012 ; BD 2/2059/07/1(P) -Phase 1: 25 August 2011 ;Phase 2: 10 May 2012

Contractual relations ;statutory submissions(licensing) ; technicalconstruction (sustainability)

1182 2012 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed residential development at Hung Shui Kiu,Yuen Long, Lot 2064 in DD 121 Hung Shui Kiu, Yuen Long YLTL 2064 in DD 121 BD 4/9177/05 31 May 2011 PM & CM management

system

1183 2012 ARK Associates Ltd Staunton Street Residential Development 70-72 Staunton Street, Sheung Wan

IL3011-3014 RP - IL94sCRP, IL94 sFss1, IL94sGss6RP, IL94sGRP,IL94sFRP, IL94sFRPsBRP,IL94sEss4RP, IL94sDss5RP,IL94sDss6RP, IL94sCss3RP,

BD 2/2033/03 19 December 2011 Application for section 16.

1184 2012 Aedas Ltd A&A works at B/1 to 2/F (Phase 7), Podium, TheLandmark, 15 Queen's Road Central

The Landmark, 15 Queen's Road Central,Hong Kong

ML 7sARP, ML 7sAss3, ML7sBRP, L2c, IL 3087, ML3sA, ML 2sB, ML 2sARP,ML2RP, ML2AsBRP

BD 2-3/2216/75/51 January 2008 (OP) ; July2008 (PC)

Phasing programme - Tomaximize the workprogramme efficiency whileminimize the interruption to

1185 2012 Aedas Ltd Kowloon City Plaza, A&A Works 128 Carpenter Road, Kowloon NKIL 6056 BD 2-3/4007/90/6 15 December 2006 (PC) Phasing in programme.

1186 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Alteration and Addition Works to Cinemas, FestivalWalk 80 Tat Chee Avenue, Kowloon Tong NKIL 6181 BD 2-3/4055/93/15 September 2006 (OP) ;

March 2007 (PC)Project delay and extension oftime handling.

1187 2012 Leigh & Orange Ltd Construction of extension block to Pui Ling School ofPrecious Blood, Fanling

13 On Lok Mun Street, On Lok Tsuen,Fanling FSSTL 194 BD 2/9170/06(P) 8 July 2004 Difficulty during construction

stage.

1188 2012 AGC Design Ltd Main Building for Hong Kong Baptist University CampusDevelopment

Hong Kong Baptist University, RenfrewRoad, Kowloon Tong NKIL 6173 BD 2/4018/08 30 April 2012 (OP) Proposed building adjacent to

schedule area.

1189 2012 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd Sausalito 1 Yuk Tai Street, Ma On Shan, New

Territories STTL 487 BD 2/9114/04 (Pt IV) November 2007 Precast Façade

1190 2012 Archiplus International (HK) Ltd Residential Redevelopment at 105 Chuk Yeung Road,Sai Kung, New Territories

105 Chuk Yeung Road, Sai Kung, NewTerritories Lot No 270 in DD 213 and ext BD 9069/04 2009

The role of Architect inconstruction in works withouta Main Contract betweenClient and Contractor.

1191 2012 ARCUS Design Ltd New upline entrance and concourse at UniversityStation University Station, East Rail Line KCRL 6 BD 22-3/7802/10/2(5) August 2012

Design and planning ofconstruction to avoiddisruption to train services.

1192 2012 WMKY Ltd Garden East Residential Development 214-224 Queen's Road East, Wanchai IL 427 sGss1 & sDRP BD 3086/93 18 July 2008 (OP) ; 14November 2008 (PC)

GFA concession / Role ofDesign and Project Architect

1193 2012 AGC Design Ltd Proposed residential development at Shing On Street 18-36 Shing On Street, Shaukeiwan,Hong Kong

SILs 459, 460RP, 461 RP,462, 483RP, 499RP,539RPsA, 540RP and 541RP

BD 2/3022/07 28 June 2012 (OP) ; 30June 2012 (PC) Fire engineering.

1194 2012 AGC Design Ltd Sheung Wan Hotel 68-74 Bonham Strand West, 18-30 DesVoeux Road West, Kowloon

IL 1161RP, IL 1162RP, IL1163RP, ext IL 1163RP, IL1164sBRP, IL 1164sCRP, IL1164RP, IL 1164sAss2RP, IL1164sARP, IL1164sAss1RR4sA, IL 1165,IL 1166, IL 1167

BD 2071/07 16 April 2012 (OP) ; 28June 2012 (PC) Design and site discrepancy.

1195 2012 Aedas Ltd Kowloon Station, Union Square Phase 1 Kowloon Station Retail Portion - Site Eand Portion of Site G KIL 11080 BD 2/7224/01 December 2006

How the project is grantedapproval by FSD as theprescriptive provisions werenot used as the basis of thegrant but rather the fireengineering approach.

1196 2012 LWK & Partners (HK) Ltd Proposed Redevelopment at 1, 1A Liberty Avenue & 6Peace Avenue, Kowloon

1, 1A Liberty Avenue, 6 Peace Avenue,Kowloon

KIL 1314. sD1624, sD1314,sE1624, RP1312, sAss3,1314sC, 1624sC

BD 2/4069/95 October 1998 Combined site and leaseconditions.

1197 2012 Arch Design Architects Ltd An integrated teaching building The Chinese University of Hong Kong, MaLiu Shui, Shatin, New Territories

STTL 437 RP & the extthereto BD 2/9063/09(P) 29 June 2012 Material use, fair-face

concrete as major finishes.

1198 2012 LWK & Partners (HK) Ltd Residential Development at Tiu Keng Leng MTRStation, Site B - Le Point

Tiu Keng Leng MTR Station, TseungKwan O, New Territories TKOTL 73B BD 2/7200/98

23 October 2007 (Phase2) - OP ; February 2008 -PC

The construction interfacebetween new developmentand existing structure.

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1199 2012 Archiplus International (HK) Ltd SOHO 38 38 Shelley Street, CentralIL 344RP & IL 348sCRP,sCss1RP, sCssAs1 andsCss1ssARP

BD 2/2050/05 August 2008 (OP) ;January 2008 (PC)

How architect overcome siteconstraint ; Implication of in-house QS

1200 2012 A. Lead Architects Ltd A&A Works 180-182 Tai Po Road, Kowloon NKIL 2345 RP & 2345 sAss1 BD 2-3/5009/63/2 November 2011Architect's tactic intransforming old tenementbuilding to brand new

1201 2012 Archiplus International (HK) Ltd Proposed Residential Building at 13-27 Warren Street,Hong Kong 13-27 Warren Street, Hong Kong IL 2040 sB, sE, sD, sC,

sFss1sFRP, sG and sH BD 3007/09 September 2012 Special site constraint.

1202 2012 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Park Central, Hong Kong Tseung Kwan New Town, New Territories Area 57, Lot 576 and Lot 66 BD 2/9136/97H January 2002 Role of an architect affectedby the project team structure.

1203 2013 Wong Tung & Partners Ltd Royal Peninsula, Hung Hom, Hong Kong Hung Hom Bay Reclamation, KIL 11084 KIL 11084 2001The importance ofcollaboration in the successof delivering architectural

1204 2013 Hsin Yieh Architects & Engineers Ltd 23 Tai Hang Drive 23 Tai Hang Drive IL 8972 BD 2/3034/00 24 November 2006 (OP) ;March 2007 (PC) Contract Procurement

1205 2013 Andrew Lee King Fun & Associates Architects Ltd School Extension for Kwong Yuet Tong ExcelFoundation Primary School in Wah Fu Estate Wah Fu Estate, 3 Wah Lam Path 8105 BD 2/3094/02(P) July 2005

School ImprovementProgramme was acknowledgeby Education Department,Architect's role onaccomplishing the goal of SIPwith cost and time efficiencywould be investigated.Especially on effective budgetcontrol of the project (initialbudget was 33m reducted tofinal cost of 25M), extendedproject programme, andcoordination betweenEducation Departments,client, tenderers, contractorsand consultants in relationwith the SIP brief would be

1206 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Mody 18 18-20 Mody Road KIL 10537 BD 2/4092/97 January 2013Syntax of Contextual Vibrancyin An Urban SpeculativeCommerical Development

1207 2013 LWK & Partners (HK) Ltd Tiu Keng Leng Station Property Development (Site A) Area 73B, NT Site A TKOTL 73 BD 4/7200/98 February 2007 How architect response to siteconstraint?

1208 2013 Leigh & Orange Ltd ASD School Improvement Programme - Buddhist TaiKwong Middle School

178 Kam Sham, Tai PO Market, NewTerritories DD6 Lot No. 1639 BD 2/3022/01(P) October 2005

A study on the Architect'sApproach and methodsundertaken to minimize theimpact of construction workson the school's operation

1209 2013 Ronald Lu & Partners (HK) Ltd Royal View Hotel 353 Castle Peak Road, Ting Kau TWIL 5 & Lot 429 in DD 399 BD 2/9131/97 October 2006 / January Change of site classification

1210 2013 LWK & Partners (HK) Ltd Proposed Composite Development at 270 Cheung ShaWan Road 270 Cheung Sha Wan Road, Kowloon NKIL1069RP BD 2/4013/06 29 November 2010 Lane/Site Area Dispute

1211 2013 Barrie Ho Architecture Interiors Ltd Redevelopment of No.50+52 Lion Rock Road No 50+52 Lion Rock Road, Kowloon NKIL5120,5121 BD 2/4042/06 27 April 2011 (OP)

How the architect and theconsultant team satisfy theclient's requirements andCLP's requirement on theprovision of transformer room.

1212 2013 P & T Architects & Engineers Ltd 12 Mount, Kellett Road No 10 and 12 Mount Kellett Road, ThePeak RBL1159 BD 2/2001/07 May 2012 Site Responsive Design in

Sloped Site

1213 2013 WCWP International Ltd Proposed Telepark For APT Satellite At Tai PoIndustrial Estate

22 Dai Kwai Street, Tai Po IndustrialEstate TPTL 13 S.E. BD 2/9195/00(P) June 2003 (OP) ;

November 2003 (PC)Balance between Value ofclient and interest of

1214 2013 Ronald Lu & Partners (HK) Ltd Dormitory and Facility Extension of United ChristianCollege (Kowloon East) 2 Lee On Lane, Kwun Tong, Kowloon GLA - NK 610 0706/AA June 2009 Project Delay and EOT

Claims

1215 2013 Architectural Services Department Construction of Fire Station -cum -Ambulance Facility atCheung Yip Street, Kowloon Bay 5 Cheung Yip Street, Kowloon Bay GLA - NK 770 ASD 51/7279L June 2013 The process of

implementation of this1216 2013 P & T Architects & Engineers Ltd VTC - Teaching Block Extension 30 Shing Tai Road, Chai Wan CWIL 151 BD 2/3035/07 1 February 2012 Delay in completion time

1217 2013 Aedas Ltd Back of House Building for Marine Mammal Ocean Park, 180 Wong Chuk Hang Road,Hong Kong RBL 1020 RP & ext thereto BD 3/2012/06(P) November 2008

When Problems occur duringconstruction, what is thearchitect's role and itscontractural Basis

1218 2013 AGC Design Ltd Proposed residential development at Shing On Street 18-36 Shing On Street, Shaukeiwan,Hong Kong

SILs 459, 460RP, 461 RP,462, 483RP, 499RP,539RPsA, 540RP and 541RP

BD 2/3022/07 28 June 2012 (OP) ; 30June 2012 (PC)

Client Management DuringDesign Process

1219 2013 Archiplus International (HK) Ltd Residential redevelopment at 105 Chuk Yeung Road,Sai Kung

105 Chuk Yeung Road, Sai Kung, NewTerritories Lot No 270 in DD 213 and ext BD 2/9096/04 September 2009

The Architect's solutionsagainst site constraints in siteand building design

1220 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Kingston Terrace - Proposed Residential Developmentat Tuen Mun Town

No.2 King San Path, Tuen Mun, NewTerritories No.384 Area 4C N.T. BD 2/9260/97 H (p)

(Pt. II) 2 August 2002 Discussion on Extension ofTime (EOT)

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1221 2013 Andrew Lee King Fun & Associates Architects Ltd Jordon Valley Park No.71, New Clear Water Bay Road, KwunTong 9AQ004 March 2010

Positive/Negative Impact ofOrganization & Procedurethat deviate from common

1222 2013 Andrew Lee King Fun & Associates Architects Ltd Heung Yee Kuk Building On Muk Street, Area II, Shek Mun, ShaTin, New Territories STTL No.547 BD 2/9001/07 25 March 2011

The difficulties and architectssolution on coordinationworks and construction of

1223 2013 Andrew Lee King Fun & Associates Architects Ltd Addition of A New Annex With An Indoor SwimmingPool for Po Leung Kuk Ngan Po Ling College 26 Sung On Street, To Kwa Wan GLA-K388 April 2009

The Role & ResponsibiltyBetween The Architect &Independent Checker Whowere hired under the sameclient (PLK)

1224 2013 Andrew Lee King Fun & Associates Architects Ltd Cadogan 37A Cadogan Street, Kennedy Town,Hong Kong IL905 SA BD 2/2052/09 September 2013

The Pros and Cons ofexcessive nominated sub-contractors over the course ofthe project

1225 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Residential development at Bedford Road No.18-30 Bedford Road KIL 11157 BD 2/4063/00 October 2008

The architect's role andstruggle in the midst ofauthority empowerment byproject manager

1226 2013 Lu Tang Lai Architects Ltd Light Industrial Building No.52 Hung To Road, Kwun Tong KTIL 286 BD 2/4075/05 26 November 2008 (OP)Development potentialbetween light industrial andoffice development

1227 2013 P & T Architects & Engineers Ltd Joint User Complex and Wholesale Fish Market at Area44, Tuen Mun

101 Wu Shan Road, Butterfly Beach,Tuen Mun GLA-TM428 SSR314 August 2010

Challenges faced by thearchitect, the architect's roleamong parties and theirsolutions to all theenvironmental guidelines, therequirements from differentdepartments, at the sametime to handle the oppositionfrom the local residents andthe Tuen Mun District Council

1228 2013 Leigh & Orange Ltd Project Symmetry, HSBC Data Centre J/O On Yiu Street, On Kwan Street, OnLai Street STTL433 BD 2/9250/10 August 2013

Administration and executionof Architectural Design forData Centre

1229 2013 Design 2 (HK) Ltd An 18-Classroom Primary School at Tai Pak Tin Street,Kwai Chung, New Territories

99 Tai Pak Tin Street, Kwai Chung, NewTerritories GLA-KT 1159 ASD programme no.

307 EP 28 August 2009How the site constraintsaffected the final design of theproject.

1230 2013 Ie, Siu & Chung Architects Ltd Proposed Residential Redevelopment 148-148A Boundary Street, Kowloon KIL 2097 sGss 1 RP & sGss1sA BD 2/4058/06 10 November 2010 How an architect solves the

problem of delayed payment

1231 2013 Wong & Ouyang (HK) Ltd New Data Centre Development 6 Chun Kwong Street, Tseung Kwan O,Hong Kong TKOTL39 BD 2/9183/10 23 January 2013

Sustainable DesignMeasurement for LEEDCertification

1232 2013 Handi Architects Ltd Residential Redevelopment at 35 Mount Kellett Road 35 Mount Kellett Road, The peak, Hong RBL553 BD 2/2008/05 April 2009 Consecutive GBP

1233 2013 Wong & Ouyang (HK) Ltd Cambridge House 979 King's Road, Quarry Bay, Hong Kong QBML 1sE ss2, QBML 1sFRP & ML703 sN BD 3/3025/00 (Pt II) 29 October 2001 (OP) ; 26

April 2003 (PC)

How the project would becompleted with an intensiveconstruction programme byachieving fast constructionmethods and curtain wallsystem was adopted

1234 2013 Wong Tung & Partners Ltd Cyber-port Development at Telegraph Bay, Pok Fu Lam(Stage 1 & 2) 100 Cyber Port, Pok Fu Lam, Hong Kong IL 8969 RP BD 2/2042/99/ ST1&2 27 March 2002 (OP) ;

October 2002 (PC)

How architect maintain qualitycontrol through design controland contract administration ina complex development

1235 2013 Chau Ku & Leung Architects & Engineers Ltd proposed Residential Redevelopment of 468-474 SaiYeung Choi Street North and 51-53 Wong Chuk Street,

468-474 Sai Yeung choi Street North and51-53 Wong Chuk Street, Kowloon NKIL317 BD 2/4002/09 22 October 2012 How architect addressed to

the site irregularities?

1236 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Ocean Pointe 8 Sham Tsz Street, Sham Tseng, TsuenWan, New Territories Lot 265 in DD 390 BD 2-4/9184/96(2) 2000 Implication on building bulk

due to GFA concession

1237 2013 Wong Tung & Partners Ltd Cyberport Residential R2 Development 6-18 Bel-Air Avenue, Cyberport, Pokfulam IL No. 8969 BD 2/2042/99/ST9 30 June 2005 How to prevent UBW inresidential units after OP

1238 2013 Wong Tung & Partners Ltd Queen Street Redevelopment (Site A) Queen Street, Sheung Wan ILN 8887 BD 2/2019/95H (SiteA) 5 February 2013

How Architect respond to thedesign and construction of thepedestrian footbridge over apublic street

1239 2013 Vincent Lai Architects Ltd 3-Storey Warehouse Building 13 Ping Tong Street South, Tong Yan SanTsuen, Yuen Long, New Territories D.D. 121 1300 SB RP BD 2/9189/08 25 August 2011 5/6 Minor Height Relaxation

1240 2013 A&B Design Consultants Ltd Alteration & Addition works of hotel conversion No 126-128 Lockhart Road, Hong Kong IL2799 BD 2-3/3063/89/5 26 April 2013

The advantage anddisadvantage of the "reuse"existing building instead ofdemolish and construct abrand new building

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1241 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed development of Po Leung Kuk EnergeticYouth Centre

Wang Yip Street, Shap Pat Heung, YuenLong, NT STT2381 BD 2/9172/10 20 March 2013 (OP)

Project team organizationdifference Architect VSConsultant role

1242 2013 Andrew Lee King Fun & Associates Architects Ltd 181 Hoi Bun Road 181 Hoi Bun Road, Kwun Tong KTIL173 BD 3/4066/09 30 September 2013Impact of nominated sub-contract arrangement inbuilding construction process

1243 2013 Foster + Partners Providence Peak TPTL 188 Residential Development Pak Shek Kok, Reclamation Phrase I, SiteC, NT, Hong Kong TPTL 188 BD 2/9056 December 2012 (OP) ;

May 2013 (PC) GRC Prefabricated Façade

1244 2013 C.S. Tam & Associates Godown Building on 10 Lok Yip Road 10 Lok Yip Road, On Lok Tsuen, Fanling FSSTLN 114 BD 2/9026/08 26 August 2011 (OP);February 2011 (PC)

Building Planning /Governmental Submission &Environment Friendly Design

1245 2013 LWK & Partners (HK) Ltd Residential Development at 146-148 Argyle Street 146-148 Argyle Street, Homantin, KIL3303 BD 2/4018/10 October 2013 (anticipated) Building Façade

1246 2013 LWK & Partners (HK) Ltd Proposed Commercial and Residential DevelopmentTseung Kwan O Area 57A, TKOTL 57, 66 and 74 Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005

To study the statutory controlsimposed by the Governmentand how do they affect thedesign of residential buildingin different direction

1247 2013 Andrew Lee King Fun & Associates Architects Ltd Redevelopment of Block B, St Stephen's CollegePreparatory School 30-32 Wong Ma Kok Road, Hong kong RBL432 BD 2/2036/05 12 March 2008 (OP) How the architect solve the

site constraint in

1248 2013 WMKY Ltd Revitalisation Scheme Conversion of old Tai O PoliceStation into Tai O Heritage Hotel

Shek Tsai Po Street, Tai O, Lantau Island,Hong Kong GLA IS 534 BD 3022/09 (HU) 23 February 2012

Construction of independentsteel structure glazed pitchedroof above existing historicbuilding

1249 2013 P & T Architects & Engineers Ltd The Construction of student hall VII at Hong KongUniversity of Science & Technology

DD227, HKUST, Clearwater Bay, HongKong 846 March 2009

To study how architects reactto unexpected events (e.g.site conditions) to mitigateprogramme delay.

1250 2013 P & T Architects & Engineers Ltd Re-provisioning of St.Francis's Canossian School 42-44 St Franci's Street, Wan Chai IL8102 & Ext BD 3015/06 30 November 2010

How the architect deal withthe special problems orissues found in school projectfor renovating an old premiseand constructing a newextension at the same time inboth design and construction

1251 2013 P & T Architects & Engineers Ltd Residential Development NKIL 6350 Ngau Chi WanKowloon 51 Fung Shing Street Ngau Chi Wan NKIL6350 BD 4064/05 December 2010

The cause of slowness of thetop down construction in theproject and cost controlrequested by client in themiddle stage of the project

1252 2013 P & T Architects & Engineers Ltd The Grandville, Shatin Lok Kwai Path, Shatin STTL526 BD 3/9067/02 16 January 2006

How architect deal with thelandscape andretain/compensate over 200number of trees within the siteunder various constraints,such as cilents design brief,construction, site context,cost, lease condition, thestatutory requirements, etc

1253 2013 Wong Tung & Partners Ltd French International Primary School 1 Cheung Man Road, Chai Wan, HongKong 135 BD 2-3/3075/95H 20 December 2011

The challenges of alterationand addition works at a sitewith historical buildings

1254 2013 Andrew Lee King Fun & Associates Architects Ltd Residential Redevelopment at 48-50 Junction Road,Kowloon 48-50 Junction Road, Kowloon NKIL 2747 sA RP BD 2/4008/09 September 2013

Pros and Cons of the dualidentity of the client and howthis project nature wouldinfluence the entiredevelopment progress.Remedial measures andarchitect solutions tocompensate the project delaydue to the replacement of siteagent and project managerduring the construction stage

1255 2013 Rocco Design Architects Ltd I Square No.63 Nathan Road KIL7425 BD 4072/04 6 August 2009 (OP); 7November 2009 (PC)

MTR Tunnel connectionconstruction & safetysupervision

1256 2013 Wong & Ouyang (HK) Ltd Proposed Development For Hang Seng ManagementCollege at Hang Shin Link, Siu Lek Yuen, Shatin

Hang Shin Link, Siu Lek Yuen, Shatin,New Territories STTL 546 BD 2/9111/11(P) September 2012

Measures taken to fulfillclient's requirement on thetime of possession of the

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1257 2013 P & T Architects & Engineers Ltd Hong Kong Design Institute & HKIVE Lee Wai LeeCampus

3 King Ling Road, Tseung Kwan O, HongKong TKOTL 107 BD 2/9070/06(P) February 2010

How did the project architectnegotiate / coordinate andwhat were the solutions /strategies adopted

1258 2013 CYS Associates (HK) Ltd Amalfi 8, Amalfi Drive, Discovery Bay

Discovery Bay NorthDevelopment Phase 14, AreaN1d, The remaining portion ofLot 385 in demarcationdistrict No. 352 and theextensions thereto

2 February 2011 Issues involving compliancewith the Specification

1259 2013 Wong Tung & Partners Ltd Mount BeaconResidential development at Junction ofCornwall Street & Tat Chee Avenue at 20Cornwall Street, Kowloon

NKIL 6196 June 2006

Introduction of a 9m high skygarden, application to theTown Planning Board & leasemodification would be

1260 2013 Lu Tang Lai Architects Ltd Light Industrial Building 78, Hung To Road, Kwun Tong KTIL 159 BD 2/4063/05 March 2008

The procedure and thedifficulties encountered in theprogress of dealing withdifferent governmentdepartment and also theconsultant team of the otherproject in order to achieve the

1261 2013 Paliburg Development Consultant Ltd An alterations and additions works at 14/F at theexisiting hotel Regal Oriental Hotel No 30-38 Sa Po Road, Kowloon City NKIL5754 BD 2-3/4342/78/16

BA 14 submitted toBuildings Department on19 October 2012

Lease modification of HeightRestriction

1262 2013 WMKY Ltd Proposed Commerical Development IL 2769 SB 256Hennessy Road, Wan Chai

256 Hennessy Road, Wan Chai HongKong 2769 (Section B) BD 2/3026/04 November 2008

The Architect's approach tocoordinate between differentparties due to the majorstructural change in designafter the commencement of

1263 2013 JA Design Architects Ltd Altro(懿山) 110-118 Second Street, Sai Ying Pun,Hong Kong

IL678 SC RP; IL678 SD ss1RP; IL678 SD RP;IL678 SDss2 RP; IL678 SD ss1 sA

BD 2/2128/10/1September 2013 (BA13 tobe submitted in August2013)

The AP/architect's role in thisproject for providing therelevant information to theclient in accordance to thenewly implementedResidential Properties (First-hand sales) Ordinance since

1264 2013 Lu Tang Lai Architects Ltd Proposed Residential Development in FSSTL 231 NT No. 8 Ching Hiu Road, Sheung Shui, NT FSSTLN 231 BD 2/9172/05 (Pt III) July 2009Exchange of land use,structure of project team andbuilding design VS statutory

1265 2013 Wong Tung & Partners Ltd Residential development at 43-45 Beacon Hill Road,Kowloon 43-45 Beacon Hill Road NKIL 4763 23 January 2007 Exemption of the EVA

requirement from BPR

1266 2013 Aedas Ltd Skyplaza Development (South Office Tower) Hong Kong International Airport, Chek LapKok

CLK Lot No. 1 RP & extthereto

BD 2/9062/03(5)(P);FP43/0004/99E 23 May 2007

The challenges of newbuilding works at a site withinairport area

1267 2013 Wong & Tung International Ltd Tseung Kwan O - TL No. 55, Ocean Shores Phase 3 TKOTL 55, Tseung Kwan O, 88 O KingRoad, New Territories TKOTL 55 BD 2/9156/97 31 October 2003

Explore the Architect's Role inConstruction Administrationwhere in-house contractor isengaged

1268 2013 Wong Tung & Partners Ltd STTL 483 Area 77 Ma On Shan (La Costa) 8 Po Tai Street, Ma On Shan STTL 483 Area 77, Ma OnShan February 2004

What are the constraints toachieving a zero carbon highrise building?

1269 2013 Wong Tung & Partners Ltd Residential Development at 15 Ho Man Tin Hill Road 15 Ho Man Tin Hill Road KIL 3389 RP BD 4049/00 April 2006 How does architect responseto site and design

1270 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Development 38 Heung Yip Road, Hong Kong AIL 344 BD 2/2008/06 5 May 2013 (OP)The role and responsibility ofarchitects in the managementof building construction

1271 2013 Thomas Chow Architects Ltd Proposed 30-classroom primary school, Diocesan Boy'sSchool 131 Argyle Street, Kowloon KIL6737 BD 2/4069/04 9 July 2004

Studies on FoundationSystems with SuspectedExplosive remained under the

1272 2013 Thomas Chow Architects Ltd Proposed IB Block at Diocesan Boys' School 131 Argyle Street, Kowloon KIL 6737 BD 3/4073/08 December 2011 Massing Disposition

1273 2013 Aedas Ltd Tung Chung Cable Car - Ngong Ping Terminal Ngong Ping Road, Lantau Island, NewTerritories N/A BD 2/9905/03 (NPT)

(P) 17 May 2006 How contract types affect aproject.

1274 2013 Ronald Lu & Partners (HK) Ltd Siu Sai Wan Complex 1E, Siu Sai Wan Road, Hong Kong Nil 24 November 2010 Study on the practicality of thesustainable design feature

1275 2013 Archiplus International (HK) Ltd Proposed Residential Building at 13-27 Warren Street,Hong Kong 13-27 Warren Street, Hong Kong IL 2040 sB, sE, sD, sC,

sFss1sFRP, sG and sH BD 3007/09 October 2012 Constraint encountered whenimplementing the original

1276 2013 Woods Bagot Asia Ltd Private Residential "The Apex" 16 Mount Austin Road, The Peak, Hong RBL 913 & 640 BD 2-3/2256/69/7 12 December 2008 Statutory Control (A & A

1277 2013 Andrew Lee King Fun & Associates Architects Ltd Sports Centre and Community Hall in Area 101, TinShui Wai Area 101, Tin Shui Wai Area 101, Tin Shui Wai ASD 9AS 045 29 May 2012 Architect's role in collapse of

bamboo scaffolding in

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1278 2013 Ronald Lu & Partners (HK) Ltd Proposed Property Development at TMTL 447, TuenMun, NT

Century Gateway's 83 Tuen Mun HeungSze Wui Road TMTL 447

BD 2/7940/01ASD14/85752/TAS/SJP/194/02

September 2012 Phrasing arrangement andmigration of PTI

1279 2013 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Young Ko Hsiao Lin Secondary School Lung Hang Estate, Shatin, New Territories STTL 557ASD62/6487/EX5/E20/500(S297)

September 2004(Conversion) ; March 2005(Annex)

Deletion of Main Contractorand EOT Issue.

1280 2013 Ronald Lu & Partners (HK) Ltd Po Leung Kuk Wu Chung College Heng On Estate, MA On Shan, Shatin, NT STTL 500 SF BD 4/3070/02 (P) September 2005Liquidation of Quantity Surveyor before final account byASD & corresponding actions

1281 2013 Ronald Lu & Partners (HK) Ltd School improvement programme - SKH Tsang Shui TinSecondary School Wo Che Estate Shatin, NT N/A S327 June 2005

A comparison between ASD& Private Developer project inbuilding process

1282 2013 Ronald Lu & Partners (HK) Ltd Tuen Mun Swimming Pool Complex Area 1 (San Wai Court) Tuen Mun N/A 9AQ 022 February 2012 Development with interface ofprivate road

1283 2013 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd

Proposed residential development at Hung Shui Kiu,Yuen Long, Lot 2064 in DD 121 Hung Shui Kiu, Yuen Long YLTL 2064 in DD 121 BD 4/9177/05 31 May 2011 PM & CM management

system

1284 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd 39 Conduit Road, Hong Kong 39 Conduit Road, Central Hong Kong IL 7898 SA September 2009 Sustainable design measuresin the project

1285 2013 Ronald Lu & Partners (HK) Ltd Maggie's Cancer Caring Centre at Tuen Mun Hospital Tuen Mun Hospital, Tsing Chung KoonRoad, Tuen Mun GLA-TM53 N/A October 2012 (OP) ;

March 2013 (PC)

An appraisal of GehryTechnologies' BuildingInformation Modeling (BIM)and construction

1286 2013 Simon Kwan Architect & Associates Ltd Wan Chai Rd/ Tai Yuen Street Redevelopment, URAH9 (Site C) Wan Chai Road / Tai Yuen Street IL8953 BD 2/3018/08 (HU)

(P)10 September 2012 (OP);10 January 2013 (PC)

Evaluate the Counter BalanceStrategy between NewDevelopment andPreservation of historical Wan

1287 2013 P. Y. Leung & Associates Ltd Extension of Hong Kong Ling Liang ChurchKindergarten

6 Leighton Lane, Causeway Bay, HongKong IL7411 BD 2/3029/07 (P) June 2011 (OP); June

2011 (PC)

How did the Project Architectovercome the restriction ofsite conditions?

1288 2013 Simon Kwan Architect & Associates Ltd URA Redevelopment at Larch Street & FIR Street, TaiKok Tsui (Lime stardom) 1 Larch Street, Tai Kok Tsui IL 11195 BD 2/4070/06 September 2011 Urban renewal resources

centre ( URRC)

1289 2013 Hsin Yieh Architects & Engineers Ltd Residential Development at DD100 338Fan Kam Road, Kwu Tung South NTHong Kong 1882 BD 2/9231/05 (Pt. V) April 2013 Construction sequence and

phasing

1290 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Office Building at 712 Prince Edward RoadEast, San Po Kong

712 Prince Edward Road East, San PoKong, Kowloon NKIL 4795 S.A., S.B., & R.P. BD 2/4084/05 January 2009 Role of architect in this project

compared to common

1291 2013 WCWP International Ltd School Improvement Work for Po On CommercialAssociation Wong Siu Ching Secondary School

2 Tai Pai Street, Tsuen Wan, NewTerritories TWTL 275 BD 3/3100/01(P) 26 August 2005 Phrasal Completion

(OP/TOP)

1292 2013 Ronald Lu & Partners (HK) Ltd Valais 28 & 33 Kwu Tung Road, Sheung Shui,NT Hong Kong DD95 LOT 2242 BD 2/9040/06 November 2010

Issues that caused thediscrepancies in interpretationand understand the methodand strategy the architectused to solve the problem

1293 2013 P & T Architects & Engineers Ltd District Open Space at Po Kong Village Road Wong TaiSin Po Kong Village Road, Wong Tai Sin GLA - NK 615 Contract No. SSS315

Section 1: February 2012,Section 2: August 2010,Section 3: August 2009

Request of AdditionalSprinkler system by FSD atthe very last construction

1294 2013 CYS Associates (HK) Ltd Wuhu Residence 111 Wuhu Street Hung Hom Kowloon HHIL 402,475, 395, 410 &459 BD 2/4104/08 23 November 2011 (OP);

6 December 2011 (PC) Open kitechen design

1295 2013 APA Architects Ltd L'Utopie 18 Yat Yiu Avenue, Tai Po Kau, Tai PoNT TRTL 160 BD 2/9106/03 July 2006 Lease modification and

drainage diversion

1296 2013 P & T Architects & Engineers Ltd Redevelopment of Hong Kong Sports Institute C3 No.25 Yuen Wo Road, Fotan, Shatin, NT ST 301 BD 2/9177/07(1) July 2013Coordinating the newconstruction and existing lifeactivities

1297 2013 Ronald Lu & Partners (HK) Ltd MTRC Rail Che Kung Temple Shatin Town Lot no. 519 519 BD 7807/08 September 2012How the site constraints couldimpact the design andconstruction in different

1298 2013 LWK & Partners (HK) Ltd Argenta No.63 Seymour Road, Hong Kong IL2300 BD 2/2077/06 June 2013 (OP); August2013 (PC)

Building modification / designoptimisation

1299 2013 Leigh & Orange Ltd SIP FDBWA SZETO HO Secondary School 7 Kai Tin Road, Lam Tin NKIL 5575 BD 3/3020/01 (P) May 2004The uniqueness of the teamorganization particularly thecilent & the architect

1300 2013 Wong Tung & Partners Ltd Aegean Coast Area 55A, So Kwun Wat, Tuen Mun, NewTerriotories TMTL 374 BD 2/9025/97 2002

Changes of the BuildingsRegulations that affectresidential building design

1301 2013 Thomas Chow Architects Ltd Extension to Elaine Field School Elaine Field School, GLA-TP 417 FuChung Lane, Tai Po, NT GLA-TP417 9AQ036 2010 Barrier Free Access

1302 2013 Andrew Lee King Fun & Associates Architects Ltd District Open Space in Area 18, Tung Chung Area 18, Man Tung Road, Tung Chung,Lantau GLA-IS369 ASD302/5098/RA/LC

SD/903 March 2010Architect's solution on dealingwith contractor of poorperformance

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1303 2013 Wong Tung & Partners Ltd Queen's Street redevelopment, Queen's Terrace (SiteB) No.1 Queen's Street M903 (H1) BD 2019/95H 16 August 2002 (OP); 3

September 2002 (PC)

Post-completion : DefectRectification & Extension ofTime (EOT) claims

1304 2013 Hsin Yieh Architects & Engineers Ltd Industrial Redevelopment TWIL 36 and TWIL 218 11 Hoi Shing Road, Tsuen Wan, HongKong TWIL 36 & TWIL 218 BD 2/911/03 (Pt II) 22 June 2012 (OP) The feasibility of sustainable

building design

1305 2013 Andrew Lee King Fun & Associates Architects Ltd ASD, Sports Centre in Area 28A, Fanling 19 Pak Wo Road, Sheung Shui Sports Centre in Area 28AASD55/92050/CWO/034-07/BP

April 2011Environmental ProtectiveMeasurement +Environmental Impact

1306 2013 Andrew Lee King Fun & Associates Architects Ltd New Annex For Po Leung Kuk Tang Yuk Tsen College Wu King Estate, Tuen Mun, NT VO No. 104 HD (ICU)E3/148(N)AA(14) August 2011

Difficulities encountered forthe whole school to complywith the current regulations &architect's solution

1307 2013 Archiplus International (HK) Ltd Hotel Development at 86 Tai Kok Tsui Road, Tai KokTsui, Kowloon

86 Tai Kok Tsui Road, Tai Kok Tsui,Kowloon KIL No. 11208 BD 4011/08 December 2011 (OP)

Architect's response and roleto the suspension of worksunder design and build

1308 2013 Amasia International Architects Ltd Alterations & Additions Works, Kiangsu & ChekiangPrimary School Vertical Extension

No. 30 Ching Wah Street, North Point,Hong Kong IL 7330 BD 2-3/3041/57/2 27 April 2005 (OP) ; 27

April 2005 (PC)Architect's solution in pre-planning stage

1309 2013 Simon Kwan Architect & Associates Ltd Residential Development at So Kwan Wat (Avignon) No.1 Kwun Chui Road, So Kwan Wat,Tuen Mun TMTL 465 BD 2/9096/05 8 August 2011 Construction of box culvert

under lease condition

1310 2013 Nan Fung Design Alterations & Addition Works at Winfield Building (BlockA & B)

No 1,3, 5 Ventris Road Happy ValleyHong Kong ILN 8538 BD 2-3/1091/81/2 (S) 29 February 2012 (CC)

28 September 2013 (PC)Building regulations VSDesign intent

1311 2013 RAD Ltd A&A Works for W Place 52 Wyndham Street, Central, Hong Kong 4093 BD 2-3/2383/71/2 July 2009 Prefrabrication

1312 2013 Lu Tang Lai Architects Ltd A Primary school in Area 31, Sheung Shui 51 Tin Ping Road, Sheung Shui, NT

697/730RP/743/744RP/747RP/752RP/761RP/760RP/938/939/940/941RP/959RP/962/1157/115/1159/4652SAssI/4652SBRP/4652SBSSI/4652SC

ASD401/6452&6453/EX/CAAL010 November 2009

Administrative and statutorycomparison - public VSprivate project

1313 2013 Lu Tang Lai Architects LtdProposed development at 11.L. 1553 SA RP ofextension to IL1553RP and SA of extension to IL 1553RP, No 28 Yat Sin Street, Wan Chai, Hong Kong

No 28 Yat Sin Street, Wan Chai, HongKong

IL3032 SB SCRP & SDRP IL1553 RP IL 1553 SA, RP ofextension to IL 1553 RP andSA of extension to IL 1553

BD 2-4/3025/04 September 2007 Reason, procedure and effecton site extension

1314 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Proposed Hotel Development at 388 Jaffe Road,Wanchai, Hong Kong 388 Jaffe Road, Wanchai, Hong Kong ML 436 sARP BD 2/3026/06 31 August 2012 Managing fire accident during

construction period.

1315 2013 Spiral Architectural Design Ltd Residential Development at Area 85 Site A, TseungKwan O, Hong Kong Area 85 Site A, Tseung Kwan o, NT TKOTL 90 BD 1/9088 October 2013

In-house constructionmanagement team involved indifferent construction stagesand how they collaborate witharchitect struggling on designprocedures and makingsuitable sacrificial designjudgement in order to meetcritical deadlines andconstruction budget tightened

1316 2013 Leigh & Orange Ltd School Improvement Project Phase 4. Good ShepherdPrimary School 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 3086/01 (P) 6 January 2005 (OP)

Combination works ofconstruction a new building,A&A work / UBW

1317 2013 P & T Architects & Engineers Ltd St. Mary's Canossian School, Proposed ExtensionBlock 162 Austin Road, Tsim Sha Tsui, Kowloon KIL 9550 BD 2/4054/00/P June 2003 (OP) ; August

2003 (PC)

Architect's solution forminimising the disturbance toexisting user in a schoolenvironment.

1318 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Double Cove, Hong Kong 8, Wu Kai Sha Road, Lok Wo Sha, Ma OnShan, New Territories DD 206 2 April 2013 Substainability Development

1319 2013 Brighspect Limited Proposed Redevelopment at 31-35A Wellington Street 31-35A Wellington Street, Central, HongKong

IL 21 sC, ss1, sC RP, sB RP,sA RP BD 2/2013/05 May 2007 Building and structural layout

1320 2013 P & T Architects & Engineers Ltd In-Situ Redevelopment of Diocesan Girls' School 1 Jordan Road, Kowloon 10718 BD 2/4078/07 (P) 7 July 2011Architect's response on thechange of design intent onusage of the podium roof

1321 2013 Aedas Ltd A&A Works to Tuen Mun Trend Plaza (South Wing) 2 Tuen Hop Street, Tuen Mun, NT TMTL 282 Site B BD 2-3/9001/84/9

Phase 1 Part 1: December2009; Phase 1 Part 2:March 2010; Phase 2 :December 2010

Construction arrangement ofan operating mall

1322 2013 MLA Architects (HK) Ltd Temporary Supermarket Building T.K.O.T.L.70, No. 1 Lohas Park Road,Tseung Kwan O, NT TKOTL 70 BD / 7192/97/3(TB) 7 October 2011

Architect's decisions in termof design / constructionmethod / choice of material ona temporary building andpossibilities after the end ofbuilding life-cycle

1323 2013 Urbanage International Ltd TWGHs Chang Ming Thien College Extension 300 Nam Cheong Street, Sham Shui Po,Kowloon NKIL 5294 July 2005 Study on connection between

old and new

1324 2013 Architecture Design & Research Group Ltd Hong Kong University of Science and TechnologyExtension to Existing Academic Building

Hong Kong University of Science &Technology, Sai Kung

DD 227 LOT 846 & the Ext.thereto BD 2/9036/07 18 October 2010;

December 2010How architect solve theissues due to existing

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1325 2013 Ho & Partners Architects Engineers & DevelopmentConsultants Ltd Proposed hotel development 123-127 Tung Choi Street, Mong Kok,

Hong KongKIL 1702 RP; 1703 RP; 1704RP BD 2/4003/09 October 2013 (OP)

Project Managementchallenges with IntegratedClient (Client being thecontractor, quantative &

1326 2013 Ie, Siu & Chung Architects Ltd Commercial Building 52-54 Wellington Street, Central, HongKong IL 988 sE, sF. & RP, sD, ss1 BD 2/2027/00 22 June 2005 (OP); 2

August 2005 (PC)Environmental friendly andsustainable building

1327 2013 P & T Architects & Engineers Ltd Tseung Kwan O Sports Ground 109 Po Hong Road, Tseung Kwan O, NT AREA 45 March 2009 (PC)

Use of virtual prototypingtechnology optimisingconstruction processes,reduced risk & project cost

1328 2013 Ronald Lu & Partners (HK) Ltd Jockey Club Ti-I College (Extension and A&A) Lok King Street, FoTan, Shatin STTL 324

BD 3/3130/01 (P)ASD93/6487/ALL361/c25/001

4 October 2005 Delay of construction

1329 2013 Ronald Lu & Partners (HK) Ltd Tsing Lung Tau TLTL 68 Residential Development 8 Hoi Long Path, Tsuen Wan, NT TLTL 68 BD 2/9175/06 22 June 2010 (OP); 4October 2010 (PC) DD & H

1330 2013 Ronald Lu & Partners (HK) Ltd Redevelopment of Kowloon Junior School 20 Perth Street, Ho Man Tin, Kowloon KIL 10735 BD 2/4024/07 (P) July 2013 (anticipated) Sustainability achievement

1331 2013 Ronald Lu & Partners (HK) Ltd Special School in Area 16, Tuen Mun for the PhysicallyDisabled Children School No. 6, 8 Hang Kwai Street, Tuen Mun GLA - TTM 404

ASD55/92050/CWO/013-09/BP

December 2012 Fault zone of foundationdiscovered during piling works

1332 2013 Aedas Ltd Residential Development at 350 Tai Hang Road 350 Tai Hang Road, Hong Kong IL 7350 BD 3002/06 25 March 2012 Facade design in relationswith program & cost

1333 2013 Aedas Ltd One Silver Sea; Authorized Person for HotelDevelopment at Podium

G/F & UG/F, 18 Hoi Fai Road, WestKowloon Reclamation, Kln KIL 11158 BD 4011/02/3 November 2012

Discussion of treatment ofGFA exempted void afterchange of use

1334 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd The Gloucester (Residential) 212 Gloucester Road, Wan Chai, HongKong

ML 435 SF, ML 435 RP & ML436 SA SS2

31 December 2012 (OP);1 May 2013 (PC)

Site excavation conflictcausing program amendment

1335 2013 Ronald Lu & Partners (HK) Ltd Proposed Student Halls VIII and IX, The Hong KongUniversity of Science & Technology

The Hong Kong University of Science &Technology, Sai Kung

DD 227 LOT 846 the Ext.thereto BD 2/9108/08

22 November 2012 (OP) ;November 2012(Substantial Completion)

Natural Terrain adjacent tothe site

1336 2013 Ronald Lu & Partners (HK) Ltd Property Development at Wu Kai Sha Station 599 Sai Sha Road, Ma On Shan, NT 530 BD 2/7990/05 June 2009 (OP);September 2009 (PC)

Incorportion of the proertydevelopment enabling worksand client's needs

1337 2013 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Ltd Upgrading and change of Use of CDW Building at 388Castle Peak Road

No. 382-392 Castle Road & No. 27-37 MeiWan Street, Tsuen Wan, N.T. DD. 453 Lot 1221 S.A. BD 2-3/9184/78/8

New Lobby - Feb 2003Arcade / shopfront - July2003Podium work - Sept 2003Covered walkway &footbridge - Sept 2005

Challenges & Strategies inAddition and Alteration Worksfor Industrial Building

1338 2013 Gravity Partnership Ltd Proposed New 300 Student Hostel DevelopmentUniversity Avenue, The ChineseUniversity of Hong Kong, Shatin, NewTerritories

STTL 437 RP & the extthereto BD 2/9151/06 October 2011

Effects of the TemporaryOccupation Permit on theproject and analyze how thedesign team have addressedvarious problems

1339 2013 Wong Tung & Partners Ltd Cineplex, Cityplaza 1, Taikoo Shing Cityplaza 1, Site V-A, King's Road, TaikooShing, HK

QBML 2 & EXT., sJR.P,sQss2sA, sQss7, sQR.P,sRs.s1sA, SRR.P.

BD 2-3/3133/74/18SITE V-A 24 November 2000

Solutions to overcome thedifficulties with tightconstruction program

1340 2013 LWK & Partners (HK) Ltd Residential & Commercial Development at No. 9 YukYat Street, KIL 11196 RP

No. 9 Yuk Yat Street, To Kwa Wan,Kowloon KIL 11196 RP BD 2/4037/05 30 October 2012

DLO disapproval of DD&Hsubmission during the finalconstruction stage

1341 2013 P & T Architects & Engineers Ltd The Redevelopment of Victoria Park Swimming PoolComplex, Phase I Victoria Park, Causeway Bay 9AS009 30 April 2013 (PC for

Section 1)

As this scope of this projectinvolved the erecting of abuilding in a location that wasin a park, an application forpermission in respect of planswas made to the TownPlanning Board under Section16 of the Town PlanningOrdinance (TPO) during theInception stage of the project.However, such applicationwas disapproved by the boardand subsequently anapplication to review theBoard's decision under

1342 2013 LWK & Partners (HK) Ltd Residential Development 71 Mount Kellett Road, Hong Kong RBL 506 BD 202 BC/97 November 2002 The role of architect in projectquality control in different

1343 2013 Aedas Ltd Ocean Park Astounding Asia Panda Trail Ocean Park, 180 Wong Chuk Hang Road,Hong Kong RBL 1020 RP & ext thereto BD 2/2049/06 (P) 10 February 2009 (Phase

1); 22 April 2009 (Phase ETFE

1344 2013 Aedas Ltd Hung Shui Kiu Meeting House 181 Castle Peak RR, Hung Shui Kiu,Yuen Long 4314 IN D.D. 124 N.T. BD 2/9079/05 23 August 2012 Site Constraints

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1345 2013 Ronald Lu & Partners (HK) Ltd King George V School (KGV) 2 Tin Kwong Road, Homantin, Kowloon KIL 10736 BD 2/4014/09(P) &BD 2/4039/09(P) July 2013 (anticipated) Architect's solution to

preserve & embrace existing

1346 2013 Andrew Lee King Fun & Associates Architects Ltd Student Hostel Site 1 Residence Lane 1, CUHK, Sha Tin STTL 437 RP & the extthereto BD 6/9143/09(P) June 2013

How architect worked onstatutory issue to achieve thedesign concept

1347 2013 Andrew Lee King Fun & Associates Architects Ltd Casa Bella, Residential Building 117 Caine Road, Central, HK 3026 BD 2077/90 12 March 2001Coordination with gov. partiesdealing with site issue tomaximize development

1348 2013 Andrew Lee King Fun & Associates Architects Ltd QRC 100 100 Queen's Road Central, HK HKIL 23RP August 2006How the architects role differswhen encounteringcontractual difficulties

1349 2013 LWK & Partners (HK) Ltd Propsed Residential Development at 38 Repulse Bay 38 Repulse Bay Road RBL 380 BD 2/2044/06 September 2013 Construction of slope

1350 2013 LWK & Partners (HK) Ltd Residential Development at 28 Barker Road, HK 28 Barker Road RBL 126 & Ext. BD 2/2054/07 March 2013 Adoption of precast façadeand stone cladding

1351 2013 Wong & Ouyang (HK) Ltd Primrose Hill 152-160 Kwok Shui Road, Tsuen Wan Tsuen Wan Town Lot No.410 BD 2/9036/03 January 2010 (OP);

February 2010 (PC) Green Building

1352 2013 Andrew Lee King Fun & Associates Architects Ltd King Palace Plaza 55 King Yip Street and 24 Hing Yip Street,Kwun Tong, Kowloon KTIL 697 BD 2/4055/08 2 Feburary 2012 Lease Modification, certificate

of compliance & surrendering

1353 2013 Architecture Design & Research Group Ltd School Improvement Programme Final Phase Wah YanCollege Kowloon 56 Waterloo Road, Kowloon KIL 6059 BD 2/3012/02(P) August 2005

Architect's role in balancingconstruction schedule & clientneeds

1354 2013 LWK & Partners (HK) Ltd Residential Development at 211-215C Prince EdwardRoad West 211 Prince Edward Road West, Kowloon 2340 BD 2/4081/07 29 January 2013 (OP) Development potential

1355 2013 Wong & Ouyang (HK) Ltd Redevelopment of Departmental Quarters for Customsand Excise Department

9-11 Tsing Chau St., 1-3 Lee Kung Street,Hung Hom, Kowloon

ASD Ref:61JA/SST321 2 August 2013

Discrepancy betweenspecification and bill ofquantities

1356 2013 Andrew Lee King Fun & Associates Architects Ltd 44 Oxford Road, Kowloon Tong 44 Oxford Road, Kowloon Tong, KLN NKIL 4152 BD 2/4012/04 July 2006 How architect respond tovariation claim?

1357 2013 Aedas Ltd Re-development of Garley Building 233-239 Nathan Road, Kowloon KIL 1993-1994, 1402 SC &1402 RP BD 2/4040/03 June 2007/ April 2007 Modification

1358 2013 Ronald Lu & Partners (HK) Ltd Po Leung Kuk School Improvement Programme - MaKam Ming College 38 Wah Ming Road, Fanling, NT AREA 49B BD 2/3074/02(P) May 2005 Extension of Time

1359 2013 Freevision Ltd E-Trade Plaza 24 Lee Chung Street, Chai Wan, HK Chai Wan Inland Lot No. 13 BD 2/2024/07 31 May 2012 Architect's solution and theproblem of his solution

1360 2013 Leigh & Orange Ltd Rehabilitation of Yue Kwong Chuen Phase I 26 Aberdeen Reservoir Road, Aberdeen HKIL 260 BD 2-3/3471/62/2 October 2011 (PC)

Challenges of upgrading oldbuildings with limited recordsand unexpected conditions,and how to match the existingstandard

1361 2013 Spence Robinson Ltd Improvement Works to Hau Tei Square HawkerBazaar, Tsuen Wan Hau Tei Square, Tsuen Wan GLA-TW422 January 2013

How the architect actiontowards the surroundingcondition and re-designing ofthe junction of the buildingedge and the surrounding inorder to fulfill the statutoryrequirement and queriesaroused after completion

1362 2013 Leigh & Orange Ltd Senior Citizen Residence, Tseung Kwan O 2 Pui Shing Lane, Tseung Kwan O, NT TKOTL 68 BD 2/9145/99 H(P)(PT.III) June 2003

Lease with special conditionsand requirements; Specialmodifications made for designfor elderly needs

1363 2013 Leigh & Orange Ltd ASD Sip Phase IV (Package 2) Group 4, Ning PoCollege (S160) 7 Kung Lok Road, Kwun Tong, KWL KTIL 685 RP & Ext. BD 2/3043/01 (P) 20 January 2004

Dangerous hill slope order /slope site implication toprogramme, cost & statutoryaspects

1364 2013 P & T Architects & Engineers Ltd R.B.L. 1164 Chung Hom Kok Housing 33 Cape Road, Chung Hom Kok RBL 1164 BD 2/2013/02 January 2005 (OP) Adoption of StandardizedDesign

1365 2013 P & T Architects & Engineers Ltd CUHK - Engineering Building Complex Phase II The Chinese University of Hong KongShatin STTL 437 BD 2/9230/98 (P) 22 November 2003 Special Design Constraints

1366 2013 P & T Architects & Engineers Ltd Crocodile Centre 79 Hoi Yuen Road, Kwun Tong, Kowloon KTIL 692 BD 2/4002/06 25 September 2009 Façade design and regulation

1367 2013 Design 2 (HK) Ltd Improvement Works for Mongkok Stadium 37 Flower Market Road, Mongkok, KLN GLA - K423ASD303/7116/RA/LCSD/001

August 2011 (substantialcompletion 5 ) Fire Engineering Assessment

1368 2013 Wong & Ouyang (HK) Ltd Bel-Air on the Peak (Area RIII & RIVA) Cyberport, HongKong

Cyberport Road, Telegraph Bay,Pokfulam, Hong Kong IL 8969 s.B. BD 2-4/2042/99/ST

10-12 2 December 2005 Refuge Floor and Sky Garden

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1369 2013 Wong & Ouyang (HK) Ltd Three Pacific Place, One Queen's Road East, HongKong 1 Queen's Road East, Hong Kong

IL47AsARP, IL47AsBRP,IL47AsCRP, IL47BsCRP,IL47BRP, IL47AsBss2,IL47AsD, IL47BsD,IL47BsBRP, IL47BsARP,IL47CsARP, IL47CsASS1RP,IL47CRP, IL47DRP,IL47DsARP, 33.905m OfWing Fung Street West,IL47sBRP, IL47sAss1,IL47sCss2sA, IL47sCss2RP,IL47sCss3sA, IL47sCss3RP,IL47sCss4, IL47sCss5 &Adjasent Government Land,IL47sCss6sRP,IL47sCss6sA, IL47sCss7RP,

BD 2/3019/01 13 August 2004 (Phase 1);9 February 2007 (Phase 2)

To analyze the process on theconstruction of the link bridgethat involved a leasemodification and/or thededication of the portion ofthe ground level of the towerand the underground tunnelfor public traffic in exchangefor bonus GFA

1370 2013 Architecture Design & Research Group Ltd New Annex Block at Hong Kong Institute of VocationalEducation Tuen Mun Campus 18 Tsing Wun Road, Tuen Mun, NT TMTL 278 BD 2/9022/07(P) June 2010; July 2010 Additional FS requirement

during late construction stage

1371 2013 Architecture Design & Research Group Ltd The Lingnan University New Campus Development(Community College), Phase 2 & 3

Lingnam University, 8 Castle Peak Road,Tuen Mun, (Site 5), Hong King TMTL 376 BD 2/9016/03(1)(P) 22 March 2005; May 2005 Courtyard Building

1372 2013 Wong & Ouyang (HK) Ltd HKU Centennial Campus Pok Fu Lam Road, HK (The University ofHK - Centennial Campus Phase I)

Extension of Inland Lot No.8833 BD 2/2082/06(P) 30 December 2011

Concept of Sustainability andthe design, construction andmanagement considerationsfor awarding the LEED

1373 2013 TFP Farrells Ltd 53 Mount Davis Road; Southwest Villas 53 Mount Davis Road IL 7208 RP BD 4/2029/02 April 2004

Green Building Technology,and its role on statutoryissues such as site coveragerelaxation and GFA

1374 2013 Chau Ku & Leung Architects & Engineers Ltd Holiday Inn Express 77-85 Jervois St. and 16-22 Burd St., HK IL 8042. IL 902, IL 4245. IL4244 & IL 900 SA & RP BD 2/2025/07 2 April 2012 Sustainability

1375 2013 WMKY Ltd 12 Broadwood Road, Hong Kong 12 Broadwood Road, Hong Kong I.L. 2132, s.A., s.C., s.D. &R.P BD 2/3020/05 8 June 2010 Slopes and site design,

building services & site

1376 2013 Wong Tung & Partners Ltd Proposed Hotels and Service Apartment Developmentin Tsing Yi 1 Tsing Yi Road TYTL 140 BD 2/9165/98 March 2004

With the unique location ofthe site, being adjacent to theContainer Terminal No. 9, andthe objective to deliver aNoise Screening Barrierdevelopment under the non-typical lease conditions, thesite constraint became thecritical design parameters forthis project. In the specialtopic, the critical issue onArchitects and developerapplying buildingmodifications to buildingdepartment has become thekey throughout the entiredesign and construction

1377 2013 K & W Architects Ltd The Signature 8 Chun Fai Terrace, Tai Hang Road, HK IL 3565 SEC ARP BD 2/3065/01 15 August 2011 Cost Control

1378 2013 Urbanage International Ltd Sip for TWGHs S.C. GAW Memorial College 7 Tsing Sum St., Town Center, Tsing Yi,NT GLA - TW182 BD 2/3020/03(P) July 2005

Measures and controls for theconstruction works, to bedone while the school

1379 2013 David S.K. Au & Associates Ltd Proposed Phase 2 Development of Eu Yan Sang 12 Wang Lee Street, Yuen Long IndustrialEstate, Yuen Long

YLTL 313 sIss3sA &Extensions Thereto andYLTL 313 sPss1 &

BD 2/9194/09 17 January 2013 Drainage Reserve Issue

1380 2013 Aedas Ltd North Satellite Concourse Hong Kong International Airport, Chek LapKok Lot No. 1 Extension Thereto BD 2/9080/06(P) October 2009 (OP) Unique emphasis on

circultation and passenger

1381 2013 P & T Architects & Engineers Ltd Canadian International School - Phase II Nam Long Shan Road, Aberdeen A.I.L. 417 3008/00(P) August 2002 Permit (Challenges of phaseOP and temporary OP)

1382 2013 P & T Architects & Engineers Ltd Proposed Residential Redevelopment at RBL 809 23 Big Wave Bay Road, Shek O, HK RBL 809 BD 2/2041/01 10 December 2003 Dual Client Party

1383 2013 P & T Architects & Engineers Ltd St. Teresa's Hospital Refurbishment 327 Prince Edward Rd. West, KLN KIL 1594 & Ext. BD 2-3/4258/62 March 2007Programme management toaccelerade constructionprocess

1384 2013 Associated Architect Ltd Comprehensive Renovation of one Grand Tower 639 Nathan Road, Mong Kok, KLN KIL 10246BD 2-3/4098/74/22,23, 24, 26, 27, 29, 30,33

End October / EarlyNovember 2013(anticipated)

Comprehensive Phasing /Program design for anoperating mall renovation

1385 2013 Wong & Tung International Ltd Tseung Kwan O - TL No. 55, Ocean Shores (Phase 2) Tseung Kwan O, 8, O King Road TKOTL NO 55 September 2001Explore the difficulties inbuilding process of multi-phase building project

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1386 2013 AGC Design Ltd Proposed Alteration and Addition Works for Hok UnRedevelopment (Phase III)

No. 8 Laguna Verde Avenue Hung Hum,KLN KIL No 11056 BD 2-

3/4182/92H(PH.3)/5 8 May 2012Issue of design andConstruction work on existingbuilding

1387 2013 AGC Design Ltd Cinema Conversion at Telford Garden Telford Garden, Kowloon Bay, KLN NKIL 5744 BD 2/7351/06 August 2008 (OP) Function of the ArchitecturalSkin and its implication

1388 2013 AGC Design Ltd Hong Kong Disneyland Resort - Disney's HollywoodHotel Sunny Bay, Lantau Island Chok Ko Wan Lot NO.1 BD 2/9901/01 2005 Parallel Construction of

Precast and Insitu concrete

1389 2013 AGC Design Ltd Asia Society Hong Kong Centre at Former ExplosivesMagazine Site IL 9000, 8 Justice Drive, Admiralty. 8 Justice Drive, Admiralty, HK IL 9000 BD 2/2018/04 August 2010

Rehabiliting a heritage into acultural performance andexhibiton venue

1390 2013 Gravity Partnership Ltd Cathy Lodge No.125, Wan Chai Road, Wanchai, HK IL 661/IL 662 BD 2/3032/98 11 June 2001 Demolition Stage

1391 2013 WCWP International Ltd School Improvement Programme for Buddist WongFung Ling College

11, Eastern Hospital Road, Sookunpoon,HK IL 8591 October 2004 Compromise Between

Interest and Constraints

1392 2013 Andrew Lee King Fun & Associates Architects Ltd Proposed Industrial Building at 6-28 Chai Wan KokStreet, Tsuen Wan 6-28 Chai Wan Kok Street, Tsuen Wan

T.W.I.L., 29S.A., 29S.B. RP,34S.A. SS.1 And 34S.A. SS2RP

BD 2/9195/10 July 2013

A notable absence of M&Eengineer, how architect workwith the nominated sub-contractors in the project?

1393 2013 Aedas Ltd The Fourm at Exchange Square "LDW Block", 8 Connaught Place, HK IL 8668 BD 2/2020/09 October 2013 Construction Sequencing overoperating P.T.I.

1394 2013 Studio One Design Ltd Proposed A&A Works for Pacnet EAC 1 ConversionProject

11 Chun Kwong Street, Tseung Kwan OIndustrial Estate

TKOL 39 Sub-Section 2 ofSection 1 BA 2-3/9016/00(S) 10 September 2012

Leadership in Energy andEnvironment Design (LEED)Accrediation

1395 2013 Aedas Ltd Tung Chung Cable Car - Ngong Ping Theme Village Ngong Ping Road, Lantau Island, NT BD 2/9905/03(NPTV)(P) Pt.111 17 May 2006 Design and Build Targeted

Cost

1396 2013 A. Lead Architects Ltd 32, 34, Argyle Street Commercial Development 32, 34 Argyle Street, KLN KIL 2855 S.A. and R.P. BD 4110/07 15 April 2010 (OP)

1. Design brief and architect'ssolutions to the client's brief2. Site Constrain andSubmission matters3. Programme and ContractAdministration

1397 2013 AGC Design Ltd Innovation Tower, The School of Design Development,Hong Kong Polytechnic University, Hung Hum KLN

The Hong Kong Polytechnic University,Hung Hum, KLN KIL 9853 R.P. and Ext BD 2/4057/08 July 2013 Government Approval

Process and Construction

1398 2013 Studio Raymond Chau Architecture Ltd Proposed Commercial Building at 15-21 Sharp StreetEast 15-21 Sharp Street East, Hong Kong

IL 730 S.B. SS4 S.E. SS2,S.B. SS4 S.E. R.P., S.B. SS4S.B. SS1 and S.B. SS4 S.B.

BD 2/3039/10 September 2013 Architect's Role - Design andBuild Contract

1399 2013 Simon Kwan Architect & Associates Ltd Hill Paramount STTL 539 Tai Wai, Shatin, N.T STTL 539 BD 2/9015/03 29 June 2009 (OP)

The Architect's solution to themajor design changes due tochange of selling strategiesduring the constrution stagewould be discussed in detailin the study

1400 2013 Aedas Ltd Silverstrand 850 Clear Water Bay Road, ClearwaterBay, Sai Kung, NT D.D. 224 Lot 369 BD 2/9048/04 22 August 2006 (OP)

How an Architect should /could strive to upholdarchitectural excellence,especially when Client'sinvolvement may interferewith the Architect's intent

1401 2013 Leigh & Orange Ltd SIP( Phase IV), Package 2, Group 13, Maryrose School 11 Renfrew Road, KLN NKIL 5947 P 262 (SP) 7 July 2005 EOT Investigation

1402 2013 Aedas Ltd Kowloon Hotel Renovation Works 19-21 Nathan Road, TST KIL 10737 BD 2-3/4030/82 26 June 2006 (Phase 1)31 Aug 2006 (Phase 2) Phasing Programme

1403 2013 Spence Robinson Ltd Proposed Golf Club Development Chuen Lung, Tsuen Wan , N.T. Tsuen Wan Town Lot NO.389 BD 2/9139/05 24 December 2008 (OP)

26 September 2008 (PC)

Architect's Solution for NewTerritories Development withDeserted/ Enclosed Lot.

1404 2014 David S.K. Au & Associates Ltd. Residential Development at 43 Beach Road 43 Beach Road, Repulse Bay RBL 1122 BD 2/2027/05 Feb 2011 Delay in ConstructionProgress due to Change of

1405 2014 WCWP International Ltd Renovation and fitting out works at the RaimondiCollege Primary Section

1-E, Shiu Fai Terrace, Stubbs Road,Wanchai, Hong Kong IL 7936 BD 2-3/2259/62/4 OP: Nov 2009; PC: Dec

2009 Major construction delay

1406 2014 Dennis Lau & Ng Chun Man Architects & Engineers(HK)Limited Mount Parker Residences 1 Sai Wan Terrace 761 BD 2/3036/05 Dec 2013 BEAM "Platinum

(Provisional)" rating1407 2014 P & T Achitects & Engineers Ltd Harrow International School Castle Peak Road, Tuen Mun, NT Tuen Mun Lot No. 475 BD 2/9178/09 (P) August 2012 Future expansion planning

1408 2014 Leigh & Orange Limited Expedition River at Summit, (Rainforest), Ocean Park Ocean Park, 180 Wong Chuk Hang Road,Hong Kong R.B.L. 1020 & Ext thereto R.B.L. 1020 & Ext. thereto

BD 2/2032/07 (P),BD 2/2032/07/2 (P),BD 2/2032/07/3 (P),BD 2/2032/07/4 (P)

Feb 2011 - 3 storeybuilding for non-domesticuseMarch 2011 - AncillaryBuilding + TransformerRoom + filtration plantroom

Complex Design Coordinationwith Specialist Consultantsand Contractors

1409 2014 Chau, Ku, Leung Architects & Engineers Ltd 726 Nathan Road, Mongkok, Kowloon, HK 726 Nathan Road, Mongkok, Kowloon HK KIL 2132 RP & KIL 2132 SARP BD 2/4065/10 Feb 2014

Discussion on the changes inurban condition & regulationaffecting OP application

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1410 2014 P & T Achitects & Engineers Ltd Hotel Development at 15-19 Luk Hop Street Kowloon 15-19 Luk Hop Street,Kowloon NKIL 6473 4043/4113 Nov 2012

Exemption of pressurizedstaircase and smokeextraction system in hotelwhich deviate from normal

1411 2014 Wong Tung & Partners Ltd Enterprise Square 5 (Phrase 2) at N.K.I.L 5927 38 Wang Chiu Road, Kowloon Bay 5927 BD 2/4042/02 OP(Phase 2): Apr/2007PC(Phase 2): May/2007

Technical Implication ofImplementing SectionalCompletion during post-contract stage

1412 2014 Aedas Limited Tung Chung Cable Car- Ngong Ping Theme Village Ngong Ping Road, Lantau DD NP 212BD2/9905/03(NPTV)(P)Pt 3

May 2006 Design & build targeted cost

1413 2014 Studio One Design Limited Proposed Commercial Building No. 100 Belcher's Street, Kennedy Town I.L.906 s.l., s.j., s.K., s.L.,s.M. & R.P. BD 2-3/2333/68/10 13 Oct 2011 (OP) Site constraints on

planning/design/construction

1414 2014 Wong & Ouyang (HK) Ltd. One Island East 18 Westlands Road, Quarry Bay, HongKong

QBIL 15 sD, QBML 1sCss5sCss6, !BML 2sG & ext, sF &ext, sF & ext, sHss6, sBRP &ext, sHRP & ext andQBML2RP & ext

BD 2/3031/01 Mar 2008 Façade treatment

1415 2014 A&B Design Consultants Limited Alteration & Addition works of hotel conversion No 126-128 Lockhart Road, Hong Kong IL 2799 BD 2-3/3063/89/5 (PC) 26 Apr 2013

How does an architectconsider balancing the costcontrol and enhancing thesustainability and quality of

1416 2014 Spence Robinson LT Limited Proposed Hotel Development at No 12-22 Davis Street,Kennedy Town 18 Davis Street, Hong Kong

ILs905 s.Ass. 7RP,SAss7SD, Sass 7sc, sAss7sB, sAss 7sA and s Ass12

BD 2/2024/06 25 Feb 2011Cost claim due todetermination of maincontractor

1417 2014 Christopher Leung & Associates Ltd. Park Signature Kung Um Road, Lung Tin Tsuen, YuenLong, NT 4043 SA and RP in DD 120 BD 2/9089/08 OP: Jun 2014

How the architect solve theproblem, how this problem toaffect the original design andwhat the final design is

1418 2014 P & T Achitects & Engineers Ltd Proposed Residential Development at 1,3,5,7,9&11Jones Street and No. 3,5,5A,7,7A,9&11 Warren Street

1-11 Jones Street and 3-11 WarrenStreet, Hong Kong

IL 2087 sA, sB & sC, sDRP&sE RP, sF, sG, sH, sJ,sK and RP

BD 2/3012/08 OP : Jan 2014

Resolving discrepancybetween Land Registry's &Land Record and approvedGBP during OP application

1419 2014 Andrew Lee King Fun & Associates QRC 100 100 Queen's Road Central, HK HKIL 23RP BD 2057/01 August 2006How the architect's role differswhen encounteringcontractual difficulties

1420 2014 WCWP International Ltd School Improvement Programme for Buddhist WongFung Ling College 11 Eastern Hospital Road, Sookunpoon IL 8591 ASD

303/5825/EX/E20/S2 Oct 2004 Compromise between interestand constraints

1421 2014 MLA Architects (HK) Ltd One Pacifc Height (A.K.A Wo Fung Street) Ko Sing Street / Wo Fung Street, SheungWan, Hong Kong

M.L 58 S.F. SS 2,3,5 and SCss1 BD 2/2052/05 April 2009 A responsive solution

between new and old

1422 2014 Sherman Kung & Associates Architects Limited Private Residence at No. 3 Henderson Road Jardine'sLookout, Hong Kong

No.3 Henderson Road Jardine's Lookout,Hong Kong I.L. 7332 BD 3014/04 September 2009 Lease Modification

1423 2014 Lu Tang Lai Architects Ltd. Proposed Detached Building at Nos 1-13 Kwai HeungStreet., Hong Kong No. 1-13 Kwai Heung Street

IL 1262 S.A ss. 3 R.P., s.A.ss.4 R.P., s.A ss. 2R.P., s.Ass. 1 R.P., s. A ss.1 s.A R.P.,s.A ss. 1 s.B R.P.

BD 2/2101/10 September 2014Study what reason make theprogramme delay and whatcan be done by Architect

1424 2014 P & T Achitects & Engineers Ltd CUHK - Engineering Building Complex Phase II The Chinese University of Hong KongShatin STTL 437 STTL 437 BD 2/9230/98 (P) 22 November 2003 Architects' solution to meet

the completion date

1425 2014 Architectural Services Department Sai Kung Tseung Kwan O Government Complex 38 Pui Shing Road, Tseung Kwan O GLA SK 574 ASD 52/5132 May 2011The architect's control onmaterial and workmanship tothe clients' satisfaction

1426 2014 K.A. Kho & Associates, Architects & Consultants Proposed Hotel Building 54-60 Portland Street, Yau Ma Tei KIL 9849, 9725 & 10232 BD 2/4047/10 July 2014 Rear lane drainage works

1427 2014 Ho & Partners Architects Proposed Residential Development at Hung Shui Kiu,Yuen Long Hung Shui Kiu, Yuen Long Lot. 2064 IN DD 121 BD 4/9177/05 OP: 31 May 2011 PM & CM system compare

with ordinary project running

1428 2014 Wong Tung & Partners Ltd No. 1 & No.3 Ede Road No.1 & No.3 Ede Road N.K.I.L. 6306 BD 2/4086/10 Apr 2014Implication of several designchanges for House 3 duringlate construction stage

1429 2014 Christopher Leung & Associates Ltd. Villa Carlton, Residential Redevelopment at N.K.I.L4850 R.P. 369 Tai Po Road N.K.I.L 4850 R.P. BD 2/4027/91 Oct 2000

How the architects resolvedplanning difficulties due to siteconstraints

1430 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK)Limited Additional Open Niches at Sections 15,16 Cape Collinson Road, Chai Wan I.L 7715 R.P BD 1-4/3003/06 2007

Balance between client'sattempt & architects' designintent

1431 2014 Wong & Ouyang (HK) Ltd. Hang Seng Management College Site D Building D, Hang Shin Link, Siu Lek Yuen,Shatin STTL 76 BD 2/9122/11 (2)

(Pt2) August 2013 Offsets by the use of BEAMPlus Assessment

1432 2014 P & T Achitects & Engineers Ltd Canadian International School- Phase 2 Nam Long Shan Road, Aberdeen A.I.L. 417 3008/00 (P) August 2002 Permit (Challenges of PhaseOP & TOP)

1433 2014 LWK & Partners (HK) Ltd. Argenta No.63 Seymour Road, Mid-Level, HongKong IL 2300 BD 2/2077/06 Jun 2013 (OP); Aug 2013

(PC)Building modification / Designoptimisation

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1434 2014 Simon Kwan & Associates Building 15W Building 15W, Hong Kong Science ParkPhase 3a, Pak Shek Kok, Tai Po TPTL 204 BD 9167/10 (P) 11 Dec 2013 (OP)

Reflection on independentProject ManagementConsultancy

1435 2014 Simon Kwan & Associates Redevelopment of Lido Complex at 28 Beach road,Repulse Bay 28 Beach Road, Repulse Bay, Hong Kong IL (RBL 368 RP) BD 2/3027/98 23 Nov 2012

BD Appeal case that affectthe occupation permit statusof the redeveopment

1436 2014 Wong Tung & Partners Ltd Residential Portion (Phase 2) at Tseung Kwan OStation Development Area 56 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) 31 Aug 2011

How architect overcome thesite constraints and respondto the development brief ?

1437 2014 Wong & Ouyang (HK) Ltd. One Kowloon 1 Wang Yuen Street, Kowloon Bay N.K.I.L 6268 BD 2/4024/00 OP: Mar 2007PC: Apr 2007

Changing the central coreduring the construction

1438 2014 Design 2 (HK) Ltd. Lee Woo Sing Residential College Residential Road, The Chinese Universityof HK, Shatin

STTL No. 437 R.P. and theextention BD 2/9167/06 19 Dec 2012 How Architect's Design

Responds to the Site

1439 2014 Ronald Lu & Partners (HK) Ltd Hong Chi Pinehill No.2 School Pinehill Village, Chung Nga Road,Namhang, Tai Po, N.T. TPTL 34 BD 2/3101/01 (P) 21 Apr 2005

Severe 4-month time delay ofconstruction, the Extension ofTime granted and theLiquidated Damages.

1440 2014 Amasia International Architects Ltd. 18-24 Pokfield Road, Residential Development 18-24 Pokfield Road, Sai Wan, HK I.L. 8906 BD 2/2055/95 16 September 2000 (OP)28 September 2000 (PC)

How architect propose tocope with the constraints interm of the complicated landform and its efficiency and

1441 2014 Thomas Chow Architects Ltd Extention to Elaine Field School Elaine Field School, GLA- TP 417, FuChung Lane, Tai Po, NT GLA-TP 417 9AQ036 2010 Barrier Free Access

1442 2014 Simon Kwan & Associates North Lantau Hospital, Phase 1 Area 25, Tung Chung Lantau, N.T. HongKong

PWP No.1 contractNo: 63MMISST322,Inform No: 6178

December 2012Building design/ admin controlmechanism for BO exemptedArchSD Project

1443 2014 Dennis Lau & Ng Chun Man Architects & Engineers(HK)Limited Grand Water Front, Hong Kong 38 Ma Tau Street, Ma Tau Kok, Kowloon K.M.L. 102 R.P. BD 2/4006/02 Mar 2007

Change of residental unitdesign due to improvement ofeconomic enviroment

1444 2014 Architectural Services Department Re-Provisioning of Wo Hop Shek Crematorium Kiu Tau Road, Wo Hop Shek, Fanling GLA-DN 421 ASD 51/5549 Sep 2012Evaluation of architect'sactions & measures toexecute the EIA process

1445 2014 Associated Architects Limited Proposed Hotel Development at 84 Hung To Road,Kwun Tong 84 Hung To Road, Kwun Tong, Kowloon KTIL 162 BD 2/4007/07 Mar 2012 Prescribed window RHP vs

performance base approach

1446 2014 Wong & Ouyang (HK) Ltd. URA Kwun Tong Centre Redevelopment - Site 1 8 Yuet Wah Street & 60 Hip Wo Street Section A NKIL 6499 &Remaining portion of NKIL BD 2/4079/09 July 2014 Phasing arrangement

1447 2014 Chau, Ku, Leung Architects & Engineers Ltd Extension to Canossa Hospital No. 1, Old Peak Road IL 647A BD 2/2031/07(P) Aug 2013 Drainage connection issue

1448 2014 CYS Associates (HK) Limited Proposed residential development for 29-31 Yuk SauStreet, 21-23 Village Road

29-31 Yuk Sau Street, 21-23 VillageRoad, HK

IL 2962 sA ss1, sC, sB & sARP BD 2/3009/07 June 2014

Contract Arrangement -Design and Build Contractarrangement for Foundation

1449 2014 Leigh & Orange Limited New Territories South Animal Management Centre(NTSAMC) & Shatin Plant Quarantine Station (STPQS) To Shek Path, New Territories N/A ASD

14/85751/TAS/SJP Sept 2013Comparing the systems ofgeneric statutory submissionsto independent checking units

1450 2014 Archiplus International (HK) Ltd. Proposed Composite Development 12 & 12A North Street IL 8962 BD 2/2004/00 Aug 2003Tree preservation and treeremoval process inconstruction stage

1451 2014 David S.K. Au & Associates Ltd. Alteration and Addition Works for Church of JesusChrist of LDS Tsing Yi Meeting House 32 Tsing King Road, Tsing Yi, N.T. TYTL 122 BD 2/9148/09 (Pt 2) Mar 2014

Contract Administration -lessons learn from the delayin foundation works

1452 2014 A & T Design Limited Alterations and Additions Works at Lee Theatre Plaza B2/F to 4/F, 99 Percival Street and 2-4Matheson Street, Causeway Bay, Hong

I.L.1452, I.L. 472RP, I.L.476RP BD 2-3/3032/91/11 November 2013 Phasing of works in A&A

works

1453 2014 TFP Farrells Ltd 53 Mount Davis Road, Pok Fu Lam 53 Mount Davis Road, Pok Fu Lum, HK IL 7208 RP BD 4/2029/02 OP: Mar 2005 PC: Jan2005

How an architect should bedealing with issue duringarising during the statutorysubmission, between theclient and the architect, andbetween the contractors and

1454 2014 P & T Achitects & Engineers Ltd German Swiss International School Peak CampusExpansion 22 Guildford Road, The Peak RBLs 1069 & 1097 BD 2/2042/07 August 2014

The change in the phasingplan in different stage to copewith issues arose fromstatutory aspect, designaspect, site aspect, cost

1455 2014 Ronald Lu & Partners (HK) Ltd Lok Sin Tong Chan Cho Chak Primary School Jat Min Chuen, Shatin, NT STTL 28 BD 2/3102/01 (P) Aug 2004 Construction access & worksarea

1456 2014 P & T Achitects & Engineers Ltd St. Teresa's Hospital Refurbishment 327 Prince Edward Road West, Kowloon KIL 1594 & Ext. BD 2-3/4258/62 March 2007Programme & site planningmanagement to accelerateconstruction process

1457 2014 LWK & Partners (HK) Ltd. Proposed Residential Development at 10-18 WharfRoad, IL 7439-7443, North Point, Hong Kong 18 Wharf Road, North Point , Hong Kong IL 7439-7443 BD 3017/00 PC: Feb 2003 How do Architect respond to

urban compacted site

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1458 2014 Architectural Services DepartmentTransformation of The Former Police Married QuartersSite on Hollywood Road into a Creative IndustriesLandmark

35 Aberdeen Street, Central GLA-HK10 400 IO Dec 2013How the architect get abalance between revitalizationand preservation

1459 2014 KLS International Architects & Planners Co. Ltd. A 27-Storey Composite Development in Wanchai 130-136 Johnston Rd. Wanchai, HK

Sub-section 3 of Section A ofMarine Lot 117 and theRemaining Portion of SectionA of Marine Lot 117

BD 2/3042/09 OP: April 2014

The effect on the changes ondesign and other provisions tofacilitate the connection withproposed extension at theadjacent site (138-142Johnston Road)

1460 2014 Ronald Lu & Partners (HK) Ltd Tuen Mun Swimming Pool Complex Area 1(San Wai Court), Tuen Mun GLA.TM 426 9AQ 022 Feb 2012 Development with interface ofprivate road

1461 2014 Studio Raymond Chau Architecture Limited Proposed Commercial Building at 15-21 Sharp StreetEast 15-21 Sharp Street East, Hong Kong

I.L.730S.B SS.4 S.E SS.2,S.B SS.4 S.E.R.P.,S.B SS.4 S.B SS.1 &S.B SS.4 S.B.R.P.

BD 2/3039/10 OP: Dec 2013PC: Mar 2014

Architect's role under adesign and build contract

1462 2014 AGC Design Ltd Disney Hollywood Hotel Sunny Bay, Lantau Island Chok Ko Wan Lot 1 BD 2/9901/01 2005 Façade Construction &

1463 2014 WCWP International Ltd Y1022- S319 Rosaryhill School (Secondary School) 41B Stubbs Road, Rosary Hill, Hong Kong I.L 3550 & Extension ASD303/5825/EX/E20/S3 September 2005 The role of architect on how

they deal with ASD and client

1464 2014 Archiplus International (HK) Ltd. 26 Mount Kellett Road The Peak, Hong Kong R.B.L. 1119 BD 2/2068/05 August 2009

Prompt response from thearchitect on the illegal treefelling, missing tree and treecompensation

1465 2014 Andrew Lee King Fun & Associates Architects Ltd. MOD 595 No. 595, Reclamation Street, Mongkok,Kowloon

The remaining Portion ofKowloon Inland Lot No.11173

BD 2/4020/04 August 2007

Elaboration of EOT claim,Architect's administration andsolution (the professional roleof an architect)

1466 2014 Simon Kwan & Associates Hong Kong Science Park Phase 3-Building 12 W & 16W

No. 12 & 16 Science Park West Avenue,Hong Kong, Science Park (Phase 3) PakShek Kok, Tai Po, NT

TPTL No. 204 BD 9167/10 (1)(P) March 2014 (OP)

The problems encountered bythe architect duringnegotiation process and thefinal solution in different

1467 2014 Andrew Lee King Fun & Associates Proposed Industrial Building at 6-28 Chai Wan KokStreet, Tsuen Wan 6-28 Cha Wan Kok Street, Tsuen Wan T.W.I.L. 29sA., 29sB.R.P.,

34s.A. ss.1 and 34s.A. ss2 BD 2/9195/10 13 Aug 2013 (OP) Changing flat slab systemduring construction stage

1468 2014 Leigh & Orange Limited The Hong Kong Federation of Youth Groups Building 21 Pak Fuk Road, Hong Kong IL 8990 BD 2/3035/01 Dec 2007 Construction administrationprocess

1469 2014 LWK & Partners (HK) Ltd. Residential Development at Sham Mong Road, NewKowloon. (Aqua Marine) 8 Sham Mong Road, Kowloon NKIL 6338 BD 2/4033/00 Dec 2003 Podium design modification

within a tight program

1470 2014 P & T Achitects & Engineers Ltd Conversion of Lai Chi Kok Hospital into Jao Tsung - IAcademy

800 Castle Peak Road, Lai Chi Kok,Kowloon LSO 901/KGS/63 22-3/3019/09 (HU) June 2013 Building Ordinance

Requirement vs Heritage

1471 2014 Thomas Chow Architects Ltd Proposed Radar (Terminal Doppler Weather RadarStation) in "Green Belt" zone

A Knoll North of Tuen Mun Road NearBrothers Point, Tai Lam Chung, Tuen Mun

Government Land AllocationGLA TM467

ConsultancyAgreement9AW029/181GK/72

October 2014

Architect's solution to reduceimpacts in new developmenton Green Belt site and itsneighborhood

1472 2014 Muchtime Limited Godown Building on 10 Lok Yip Road 10 Lok Yip Road, On Lok Tsuen, Fanling FSSTLN 114 BD 2/9026/08 OP: 26 Aug 2011; PC :Feb 2011

Government submission &environmental friendly design

1473 2014 LWK & Partners (HK) Ltd. Eden Gate 5-11 Ede Road, Kowloon Tong, Kln NKIL no. 6423 BD 2/4110/10 June 2014 Speed Up Program

1474 2014 MCAA Ltd. Proposed Alteration and Addition Works for Wong TzeBuilding

J10 Hoi Yuen Road and How Ming Streeton K.T.I.L.2, Kowloon K.T.I.L.2 BD 2-3/4147/80/2 Oct 2014

To analysis the procedures toresolve the situation involvednew materials to beconstructed on the existingbuilding; maintain theoperation of HSBC on theground floor as usual andguarantee the constructionprogress rate on the otherfloors; design a new means ofescape for existing building tofulfill the requirements ofCode of Practice for Fire

1475 2014 Leigh & Orange Limited Hong Kong Bapist University, School of ContinuingEducation, Shek Mun Campus 8 On Muk Street, Shek Mun, Shatin STTL 540, Area 11 BD 2/9107/03 (P) OP: 7 July 2006 End user's based design

approach

1476 2014 LWK & Partners (HK) Ltd. URA- K30, I-home 38 Larch Street, Tai Kok Tsui KIL No, 11182 BD 2/9134/03 March 2009 Maximizing the developmentpotentials

1477 2014 Leigh & Orange Limited Redevelopment of Lam Tin Phase 6 On Tin Estate, On Tin Street, Lam Tin KL29NR HD(ICU) BD2/KL29NR/06 Dec 2004

Interface co-ordination of thelink bridge between phase 4and phase 6

1478 2014 Ie, Siu & Chung Architects Ltd Proposed Commercial Building 14-18 On Lan Street, Central, HK IL 2113 sA RP, sA ss1, IL2114, IL 2115 & IL 2116 BD 2/2014/07 Dec 2013

How architect response tosome unexpected situationsduring construction period ?

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1479 2014 Wong & Ouyang (HK) Ltd. Hong Kong Convention and Exhibition Centre AtriumLink Expansion 1 Expo Drive, Wanchai, Hong Kong GLA 840 BD 2-3/2050/84/7 March 2009

The tackle of site constraintsfrom planning, coordinationand operation

1480 2014 Barrie Ho Architecture Interiors Ltd. Wholesale Conversion of Good Prospect IndustrialBuilding

No. 33-35, Wong Chuk Hang Road, WongChuk Hang, Hong Kong AIL 155 BD 2-3/3124/76 Aug 2014 (Tentative)

Examination the Impact of thesustainable building designGuidelines to the building plansubmitted beforehand

1481 2014 Architecture Design and Research Group Ltd. The Lingnan University New Campus Development ofStudent Hostel and Academic Block

The Lingnan University, Junction of TuenKwai Road and Castle Peak Road, TuenMun, N.T

T.M.T.L 482 BD 2/9097/08 OP: Aug 2011

How the specially designedacoustic windows beingadopted in this developmentin response to noise matter?Detail design of proposedacoustic window system interms of both materiality andarchitecturally, the resolutionfor such application to becomplied with the complexprescribed windowrequirements, necessarygovernment submissions andapplication for modifications,the order of natural ventilationdesign incorporated with theoverall structure of typicalhostel layout around the

1482 2014 P & T Achitects & Engineers Ltd VTC Permanent Campus for the School of Businessand Information System at Tsing Yi 20A Tsing Yi Road, Tsing Yi Island TYTL 123 BD2/9093/02(P) Sept 2004

The role of architects inquality and time control of thefast track project

1483 2014 Handi Architects Limited Proposed Industria Redevelopment at 91-97 BedfordRoad

91-97 Bedford Road, Tai Kok TsuiKowloon, Hong Kong

K.I.L. Nos.7798,7799,7800,7801 BD 2/4025/09 July 2013/ Sep 2013 GBP disapproval on

fundamental issues prior to

1484 2014 ARCA Ltd. 32 Plantation Road, The Peak, House G 32 Plantation Road, The Peak, HongKong R.B.L. 512 BD 2-3/2307/72/4 December 2008

To examine primarily atgeotechnical issues of thehouse and how these affectthe architect's choice ofconstruction methods andprocedures to complete theextention

1485 2014 Aedas Limited 31-37 Des Voeux Rd. Central HK 31-37 Des Voeux Rd. Central, HK I.L 2179 s.C, R.P., s.B & I.L.2180 BD 2/2017/10 January 2014 (OP)

March 2014 (PC) Right of way

1486 2014 LWK & Partners (HK) Ltd. Residential Development at Fanling Sheung Shui TownLot No. 202

Junction of Fan Leng Lau Road, Wo MukRoad, Leun Hing Street, Luen Wo Hui,Fanling

F.S.S.T.L. 202 BD 2/9197/10 Tentatively Mid of JulyArchitect's Response tochange in statutoryrequirement

1487 2014 Architectural Services Department A 30-classroom primary school in Area 55, Tuen Mun So Kwun Wat Road, Area 55, Tuen Mun GLA No. TM420ASD51/6472J/EA/E20/O80

19 Aug 2011

The approaches/differencesbetween public/privatesectors that contribute to thequality of architecture

1488 2014 Andrew Lee King Fun & Associates CLP Substation at Chui Ling Road Chui Ling Road Area 72 Tiu Keng Leng TKOTL 116 BD 9011/10 (P) June 2013 (OP)

Impact of unclear workdivision between sub-consultants in affectingbuilding construction process

1489 2014 Aedas Limited Redevelopment of St. Rose of Lima's School 4 Embankment Road & 1 Duke Street,Kowloon KIL 2356, 2585 BD 2/4012/08 July 2011 Architects' decisions on

sustainability design approach

1490 2014 WCWP International Ltd The Forfar at 2 Forfar Road 157 Argyle Street, Kowloon BD 1/4038/05 KIL 4022 RP OP : Jan 2010, PC : Sep2010 Height Restriction

1491 2014 Leigh & Orange Limited Renovation of Tai Po Market Station Tai Po Market Station KCR L/8 BD 2-3/ 7836/96/7 July 2009

1. Construction phasing tofacilitate smooth A&A workswhile keeping daily operationunaffect 2. Reason for away to avoid delay ofconstruction work

1492 2014 LWK & Partners (HK) Ltd. Dunbar Place 146-148 Argyle Street, Homantin, Section A of K.I.L 3303 BD 2/4018/10 Aug 2013 Beam Plus Application

1493 2014 P & T Achitects & Engineers Ltd The Open University of Hong Kong Chung Hau StreetCampus Development

81 Chung Hau Street, Ho Man Tin,Kowloon No. 11202 BD 3/4088/11 (P) Jan 2014 Green and energy efficient

building design

1494 2014 Leigh & Orange Limited School Improvement Project Phase 4. Good ShepherdPrimary School 171 Ma Tau Wai Road, Kowloon KIL 7860 BD 3086/01 (P) 6 January 2005 (OP) The role of an architect in

dealing with divergence

1495 2014 P & T Achitects & Engineers Ltd New Private Indepandent School at Shum Wan Rd.,Aberdeen 19 Shum Wan Road, Aberdeen A.I.L. 452 BD 2/2007/03 (P) HK 24/2007 (OP); 27 Aug

2007 Design constraints, site.

1496 2014 TFP Farrells Ltd Kennedy Town Swimming Pool, Phase I 2 Sai Cheung Street North, KennedyTown Praya, Sai Wan, HK GLA HK 1075 ASD

14/85750/TAS/SJP/1 March 2011 Considerations and effects ofPhasing on Project Design

1497 2014 Archiplus International (HK) Ltd. Shapo South Residential Development 1, Ying Ho Road, Yuen Long 2099 in D.D. no. 109 BD 9083/07 3 Sep 2013 Architect's response to landsdepartment comment

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1498 2014 Leigh & Orange Limited School Improvement Programme Phase IV Package 2,Saviour Luthern School 288-290 Tai Po Road, Kowloon NKIL 4456 ASD 102/ 92301/

CAA G39OP: Jul 2004PC: May 2004

Retaining existing structurethat was't part of demolitionplan submitted to BD

1499 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK)Limited

The Grandiose, Residential and CommercialDevelopment at Tseung Kwan O Area 558B, TKOTLNo,75

9 Tong Chun Street, Tseung Kwan O,Kowloon, Hong Kong 75 BD 3/7227/02 January 2006 (OP)

June 2006 (CC)

Design issues underscheduled area no. 3-railwayprotection zone

1500 2014 P & T Achitects & Engineers Ltd Residential Redevelopment at I.L. 7735 335-339 TaiHang Road, Hong Kong 335-339 Tai Hang Road, Hong Kong I.L. 7735 BD 2/3056/09 October 2013

How the architect deals withthe restricted lease conditionsby applying a leasemodification to relax theconstraints, archieve theoriginal design intent, fulfill theclient's brief, and satisfy the

1501 2014 Ho & Partners Architects Proposed hotel development 123-127 Tung Choi Street, Mong Kok,Hong Kong

KIL 1702 RP; 1703 RP; 1704RP BD 2/4003/09 October 2013 (OP)

The professional relationshipof the dual roles of contractorbeing the Client

1502 2014 David S.K. Au & Associates Ltd.Proposed Internet Applications Centre at S.S 3 ofSection D of Tseung Kwan O Town Lot No. 39 andExtensions Thereto (Phase1) & (Phase 2)

22 Chun Cheong Street, Tseung Kwan OIndustrial Estate - T.K.O.T.L. 39 s.D. ss3& thereto

Subsection 3 of section D ofTseung Kwan O Town Lot 39

BD 2-3/9030/95(Phase 1),BD 2-3/ 9030/95/2

Phase 1: July 2014 (BA14) Phase2: September 2014 (OP

A change of use to an existingbuilding

1503 2014 Cypress Consultant International Ltd. 37 San Shek Wan DD329, Lantau Island 661 BD 2/9194/08 15 May 2013 (OP); 16May 2013 (PC)

Development potential, treepreservation and public

1504 2014 P & T Achitects & Engineers Ltd The Construction of Superstructure of Block A for St.Paul's Hospital Redevelopment

No. 2 Eastern Hospital Road, CausewayBay, Hong Kong IL 1018 BD 2/3025/05 Nov 2009

Re-appointment of interiordesigner after the award ofmain contract

1505 2014 Aedas Limited Proposed Logistic Center Hong Wan Road, Tsing Yi, NT 180 BD 2/9054/11 Anticipated on 30 Jul 2014 Fire engineering approach tofire safety

1506 2014 Housing Department Tin Shui Wai Area 103 (Tin Ching Estate) Tin Shui Wai Area 103 YL 28/ NR-01 HD(ICU) B12/ YL 28NR/ 1 &2 June 2008

How the project architectcorrespond to an unexpectedrequest of client withoutcausing tremendous impacton the contruction programme

1507 2014 LWK & Partners (HK) Ltd. Residential Department at No. 20-26 M.L. No. 296Wanchai, Hong Kong 20-26, Johnston Road, Wanchai, HK M.L No.296 BD 2/3030/05 26 Mar 2009 Sustainable building design in

residential project

1508 2014 Ronald Lu & Partners (HK) Ltd The Giverny Man Kei To, Pak Sha Wan, Sai Kung, NT Lot 1184 IN D.D. 217 BD 9121/01 Apr 2005 (OP)May 2005 (PC) Project Management

1509 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK) NI333 A&A Works to Pioneer Centre 750, Nathan Road K.I.L. 2111 BD 2-3/4157/89 February 2006 Dedication of public passage

1510 2014 ARK Associates Limited Residential Development on R.B.L. 800 at No. 20,22,26A, 26B, 26C, 26D, 26E, 26F Cape Road

No. 20, 22, 26A, 26B, 26C, 26D, 26E, 26FCape Road R.B.L. 800 BD 2067/07 26 March 2010 (OP)

3 November 2010 (PC)Study of Design Constraint ona sloping site

1511 2014 AGC Design Ltd Annex Block and Link Bridge of Baptist University RoadCampus Development

36 Renfrew Road, Kowloon Tong,Kowloon K.N.I.L. 6127 BD 2/4019/08 July 2012

(ref. KN21/2012(OP))

Statutory obligations of AP insite supervision and accidentduring construction

1512 2014 Leigh & Orange Limited Mary Rose School Improvement Programme 11 Renprew Road, Kowloon Tong NKIL 5947 BD 3078/02 July 2005 EOT claims & disputes

1513 2014 Spence Robinson Ltd. Construction of a Multi Purpose Use Sand Count in TinShui Wai Tin Yip Road, Tin Shui Wai GLA TYL 1375 SIF(6) in LCS 1/HQ

734/09(9) June 2014 Drainage and rain water

1514 2014 Z Architects Ltd. Proposed Commercial Tower at No. 459-461 Lockhart No. 459-461 Lockhart Rd I.Ls. 2833 S.B & S.C. BD 2/3015/10 Sep 2013 Flexibility of space uses

1515 2014 P & T Achitects & Engineers Ltd The Redevelopment of Craigengower Cricket Club 188, Wong Nai Chung Road, HappyValley, Hong Kong I.L 8881 BD 2-4/3070/01

(PH1) Apr 2003Two- phase construction atthe same time maintainingnormal operation of the club

1516 2014 Architecture Design and Research Group Ltd. A 24- Classroom Primary School at Inverness Road 39 Inverness Road, Kowloon City, KLN GLA-NK -680ASD55/92050/CWO/025-07

PC: May 2010

Comparison of statutoryapproval system betweenBuildings Department andS.C.C.U of ArchitecturalServices Department

1517 2014 Ronald Lu & Partners (HK) Ltd Ng Yuk Secondary School Sun Chui Estate Shatin, N.T STTL 554ASD53/6487/ALL318/C25/001

March 2005

The issue affecting delay,comtractor's procedure ofclaiming EOT, architect'scriteria and action etc

1518 2014 LWK & Partners (HK) Ltd. Proposed Residential Development at No. 56 PeakRoad, HK No. 56 Peak Road, HK RBL 718 BD 2014/00 April 2003

Review on development andefficacy of green andinnovative buildingsincentives to architectural

1519 2014 Chau, Ku, Leung Architects & Engineers Ltd TWGHS Fong Shu Chuen Social Service Building 6 Po Man Street Shau Kei Wan, HongKong SIL 832 BD 3008/96 August 1999

Location of the site that is fallwithin the MTR protectionarea (Schedule Area 3)

1520 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK)Limited Royal Terrace 933 King's Road, North Point, HK

Q.B.M.L. 4S. CSS1 R.P.,Q.B.M.L. 4S. CSS1 S.B.,Q.B.M.L. 4S.E,Q.B.M.L. 4S. CSS1S ARP,Q.B.M.L. 4S. CSS 1S.A

BD 2/3008/99 2002Role of architect in traditionalcontract with client''s in-houseconsultants/contractors

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1521 2014 T.S. Chu Architects Ltd. Wholesale Conversion for pioneer industrial building 213 Wai Yip Street, Kwun Tong, Kowloon K.T.I.L. No.294 BD 2-3/4355/10/6 August 2014Wholesale conversion ofindustrial building- challenges& opportunities

1522 2014 A. Lead Architects Limited (Kowloon Tong Baptist Church) Proposed Church,Kindergarten & Home for Elderly Cornwall Street, Kowloon N.K.I.L. 6182 BD 2/4007/02 November 2008

Mixed use with three clients.How did the architect managethem?

1523 2014 Leigh & Orange Limited ASD School Improvement Programme Phase IVPackage 2- St Paul's School (Lam Tin) 10 On Tin Street, Lam Tin, Kowloon NKIL 5210 BD 3024/01(P) November 2004 (OP) Site Constraints &

accessibility at design &

1524 2014 Vincent Lai Architect Ltd 3-Storeys Warehouse Building 13 Ping Tong Street South, Tong Yan SanTsuen, Yuen Long, New Territories D.D. 121 1300 SB RP BD 2/9189/08 25 August 2011

"Time frame" processes andapplication for section 16under the TPO heightrestriction from the gazettedoutline zoning plan "Remarks"

1525 2014 Aedas Limited Re-development of 1-11A, San Wai Street, Hung Hom,Kowloon - Star Ruby 1-11A San Wai Street, Hung Hom KIL 7488, 7489, 7490, 7491,

7492, 7493, 7494 BD 2/4057/09 May 2014 Study of F.A. Provision inresidential building

1526 2014 Andrew Lee King Fun & Associates 188 Tai Po Road 188 Tai Po Road, Sham Shui Po, Kowloon

NKIL 1694 SARP; NKIL 1694SA ss 1, NKIL 1694 SAss2,NKIL 1694 SA ss3, NKIL1694 SAss4, NKIL 1694

BD 2/4002/10 (Tentative) July 2014

Imbalance of project team -main contractor is asubsidiary company of theclient

1527 2014 Ronald Lu & Partners (HK) Ltd Commercial Development at Fan Ling, Sheung Shui,Town Lot No. 73

No. 48 Lung Sum Avenue, Sheung Shui,NT No. 73 BD 2/9166/09 March 2014 Oversized podium

1528 2014 Ronald Lu & Partners (HK) Ltd Kwun Tong Swimming Pool Complex (Section1) 2 Tsui Ping Road, Kwun Tong GLA-NK 656 051 RG SCCU Site Audit : 6 Feb2013

Large Volume IndoorSwimming Pool Hall Design

1529 2014 P & T Achitects & Engineers Ltd Redevelopment of St. Paul's Co-Educational CollegePrimary School No.11 Nam Fung Path, Wong Chuk Hang GLA- HK 1023 Aug 2008 Carbon zero environment

concept adoption

1530 2014 P & T Achitects & Engineers Ltd Kellett School, Kowloon Bay Campus 7 Lam Hing Street, Kowloon Bay NKIL No. 6504 BD 2/4058/10OP: 23 Aug 2013PC: Sep-Dec, 2014(Sectional)

Late & contradicting decisionsmade by client at theconstruction stage

1531 2014 Wong & Ouyang (HK) Ltd. Redevelopment of Ash Health Centre, Hong KongBaptist Hospital 330 Junction Road, Kowloon Tong 5907 BD 2/4048/03 March 2008

Construction Method toMinimize the Impacts to theExisting Building

1532 2014 WCWP International Ltd DHL Central Asia Hub Project Hong Kong International Airport, Chek LopKok

R.P of CLK Lot 1 and TheExt. BD 3/9820/02 (P) April 2004 Balancing between value of

client & interest of public

1533 2014 Foster & Partners Providence Peak- TPTL 188 Residential Developemnt Pak Shek Kok Reclamation Phase 1 SiteC New Territories TPTL 188 BD 2/9056 December 2012 (OP)

May 2013 (PC) GRC Prefabricated façade

1534 2014 P & T Achitects & Engineers Ltd The Hillgrove Castle Peak Road, Area 58, Siu Lam, NT Tuen Mun Town Lot. 371 BD 3-6/9175/99H Sep 2002Costs savings to compensatefor the loss in achieving abetter living environment

1535 2014 RDL Asia Limited Ocean One 6 Shung Shun St., Yau Tong YTIL 20 BD 4041/09 OP: 18 Jan 2013; PC: 8Feb 2013

How architects satisfy client'srequest when construction isstarted already

1536 2014 Housing Department Construction of Un Chau Estate Phase 5 Cheung Sha Wan V.O. 55 HD (1cu) B12/KL79NR/05 Apr 2012 How the Architect managed

delays

1537 2014 P & T Achitects & Engineers Ltd No. 9 Shouson Hill Road No. 9-19F, Shouson Hill Road RBL 345 RP BD 2/2033/06 Jan 2012Advantages & disadvantagesof procedures that deviatefrom common practice

1538 2014 AGC Design Ltd Proposed Alterations & Additions Works at Area 15,Yuen Long Interchange of Tuen Mun LRT

Sun Yuen Long Centre, 8 Long Yat Road,Yuen Long, NT DD 115 Lot 1576 BD 2-3/7604/95/7 (Pt.

II)(OP) : Phase 1 12 Feb2014

Adapting to phaseconstruction

1539 2014 P & T Achitects & Engineers Ltd Kowloon Station Package 4 Development No.1 Austin Road West Kowloon KIL 11080 BD 2/7204/99- D OP: 25 July 2003Corresponding change ofbuilding design in relation toregulation change

1540 2014 Aedas Limited AIG Tower 1 Connaugut Rd, Central, Hong Kong ML 275ML278 (SA) and (RP) BD 2004/01 OP: Apr 2005

PC: May 2005

Dedication Proposal to benefitpublic and to expandconnection network in central,

1541 2014 Handi Architects Limited Proposed Composite Redevelopment at No. 38 KwunChung Street

38 Kwun Chung Street Kowloon, HongKong

K.I.L.S 3240, 3241, 3242,3243, 3244 & 1701 BD 2/4043/08 August 2014 Project execution in economic

crisis

1542 2014 LWK & Partners (HK) Ltd. Proposed Re-development at No. 23-29 Wing FungStreet, Wan Chai, Hong Kong

No. 23-29 Wing Fung Street, Wan Chai,HK Inland Lot 526 BD 3015/03 April 2006 Development potential & site

coordination

1543 2014 Dennis Lau & Ng Chun Man Architects & Engineers(HK)Limited The Hong Kong Polytechnic University, Phase VII Hong Kong Polytechnic University

Campus Hung Hom Kowloon KIL 9853 RP and ext BD 2/4004/02 Aug 2005

How the architect handled anunexpected groundsettlement on Hong ChongRoad and Chatham Roadduring phase VII substructureconstruction work, whichresulted in 2-month halt of the

1544 2014 CYS Associates (HK) Limited One Mayfair 1 Broadcast Drive, Kowloon Tong NKIL 6374 BD 2/4003/07 OP : 28 Dec 2011; PC : 09 Tree preservation1545 2014 Simon Kwan & Associates Tin Shui Wai Community Health Centre 3 Tin Yip Road, Tin Shui Wai GLA - TSW 62 ASD 66 mm Dec 2011 Architect in the contract

1546 2014 Ronald Lu & Partners (HK) Ltd Vocational Training Council Training Hotel and ChineseCuisine Training Institute Resources Centre

6/F and M/F of Pokfulam Training CentreComplex, 145 Pokfulam Road AIL 420 BD 2-3/2063/90/3-4 Phase1: March 2009

Phase 2: June, 2009Contract Administration-Interior Design Related

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1547 2014 Wong Tung & Partners Ltd Le Meridien Cyberport 100 Cyberport Road, Pokfulam, HK I.L. 8969 RP 2/2042/99/ST3 April 2004

How would the architectovercome difficulty of a tightcompletion programme withina mixed development site?

1548 2014 Lee King Fun & Associates Architects Limited Proposed Office Building at no. 10 Shing Yip Street,Kwun Tong

No. 10 Shing Yip Street, Kwun Tong,Kowloon K.T.I.L. 63 BD 2/4059/09 August 2014 No electrical & mechanical

engineer in this project1549 2014 Freevision Lid. E- Trade Plaza 24 Lee Chung Street Chai Wan Inland lot no. 13 BD 2/2024/07 May 2012 Sky Garden

1550 2014 Leigh & Orange Limited Union Hospital Extension Union Hospital, 18 Fu Kin Street, Tai Wai,Sha Tin- STTL 168 RP STTL 168 RP BD 2-3/9094/04/2 2007 Construction Phasing and

Sequence

1551 2014 Ronald Lu & Partners (HK) Ltd Property Development at Wu Kai Sha Station 599 Sai Sha Road, Ma On Shan, NewTerritories 530 BD 2/7990/05 June. 2009 (OP)

September 2009 (PC)

Incorporation of as-builtdevelopment provisions andfulfilling client's design needs

1552 2014 WCWP International Ltd Residential Development of 9 Seymour Road 9A-H Seymour Road and 5, 6, 6A, 7 and7A Yig Fai Terrace

IL 585 RP and Ils 4626, 4627,4628 and 4629 BD 2/2090/06 OP: 06/2011 PC: 03/2012 Dispute & Arbitration

1553 2014 APA Architects Limited L'Utopie 18 Yat Yiu Avenue, Tai Po Kau, Tai Po, TRTL 160 BD 2/9106/03 Jul 2006 Lease Modification

1554 2014 Z Architects Ltd. No.139 Queen's Road Central on I.Ls. 4810-4819,Hong Kong 139 Queen's Road Central, HK I.Ls. 4810-4819 BD 2-3/2060/ 95 Aug 2010 Change of use

1555 2014 Wong & Ouyang (HK) Ltd. Tower 21, The Kowloon Station Development Austin Road West 11080 BD 2/7219/00(F) Pt.VII March 2007 Abortive design changes for

architect as a consultant

1556 2014 Lu Tang Lai Architects Ltd. Proposed Residential Development at No. 8 Ching HiuRoad, 8 Royal Green

No.8 Ching Hiu Road, Ng Uk Tsuen,Sheung Shui NT- FSSTL 231 BD 2/9172/05 June 2009

Relationship among saleablevalue, building design andstatutory requirement, and thepros and cons to achievemaximum building efficiency

1557 2014 A. Lead Architects Limited KP Tower 93-95 King's Road, North Point I.L. 2273 Sec C.C BD 2/3005/08/2 June 2014 (Tentative) Previous AP ceased to beappointed

1558 2014 ARK Associates Limited Proposed Residential Development at No. 98 JavaRoad 98 Java Road, North Point, HK

I.L. 3539 SEC. A SS. 7 R.P.,I.L. 3539 S.A. S.S.7,S.B. S.S.1, S.S.2, S.S.3,AR.P. OF S.B. OF I.L. 3539

BD 2/3010/07 October 2011 (OP)January 2012 (PC) External Design Consultants

1559 2014 Cheung Kong (Holdings) Limited Proposed Residential Development alnwick Road,Kowloon 8 Alnwick Road, Kowloon NKIL 4782 BD 2/4006/07 23 Nov 2012

Elicitation & comparisonbetween the existing leaseand the new lease

1560 2014 Ronald Lu & Partners (HK) Ltd Royal View Hotel 353 Castle Peak Road, Ting Kau TWIL 5 & Lot 429 in DD 399 BD 2/9131/97 OP: Oct 2006; PC: Jan2007 Change of Site Classification

1561 2014 Ronald Lu & Partners (HK) Ltd Redevelopment of Upper Wong Tai Sin Estate-Phase 1 8 Wong Tai Sin Road KL 31 RR HD KL31-1 Sept 2000 Delay of master programme

1562 2014 Christopher Leung & Associates Ltd. Proposed Residential Redevelopment on R.B.L 310 atNo. 60 Peak Road, Hong Kong No. 60 Peak Road, Hong Kong R.B.L 310 and Ext BD 2/2013/97 30 Sep 2005

The possibility of applyingmore sustainability measuresfor independent house

1563 2014 ARK Associates Limited Proposed Residential Development at 33 CapenterRoad

Nos 79-81 Sa Po Road & Nos 33-37Carpenter Road, Kowloon City, Kowloon,HKSAR

N.K.I.L. 1105 R.P.,N.K.I.L. 1105 S.B.R.P.,N.K.I.L 1105 S.A.R.P.,N.K.I.L. 1433 R.P.,N.K.I.L. 1741 R.P.

BD 2/4083/10 September 2014

Demolition works withpreservation of existingcommon staircase of theadjoining old building

1564 2014 P & T Achitects & Engineers Ltd Caritas Lok Kan School 17 Tin Tan Street, Tin Shui Wai, YuenLong, New Territories Area 32 Tin Shui Wai SSP308-101ET; ASD

consultancy May 2007Evaluation of impact of designfor handicapped on designand construction progress

1565 2014 Ho & Partners Architects 8 LaSalle No. 8 La Salle Road, Homantin KIL 2098 BD 2/4056/09 July 2014

Co-ordination withGovernment bodies onresolving encroachment ofrun-in/out into tree protection

1566 2014 Dennis Lau & Ng Chun Man Architects & Engineers(HK)Limited Double Cove- Starview (Phase 2) 8 Wu Kai Sha Road, Lok Wo Sha, Ma On

Shan NT S.T.T.L 502- Phase 2 BD 2-4/ 9058/06 (1) July 2014The struggle of architect todeal with two independent in-house contractors

1567 2014 Wong Tung & Partners Ltd Enterprise Square 5 Phase 1 (Mega Box) 38 Wang Chiu Road, Kowloon Bay 5927 NKIL BD 2/4042/02 December 2006

The pros & cons of employingoversea design consultant onlocal projects, and theinfluence to Hong Kongarchitect's design innovation

1568 2014 CYS Associates (HK) Limited Proposed Residential Development No. 53 Conduit Road, HK I.L. 2138 R.P. & I.L. 2613 BD 2/2012/04 End of Oct 2014 Abortive work due to DLO latecomment

1569 2014 LWK & Partners (HK) Ltd. Residential Development at S.I.L. 845 Yiu Hing Road,Shaukeiwan, Hong Kong 88 Yiu Hing Road, Shau Kei Wan S.I.L. 845 BD 3010/00 February 2003

Formation of 'green area' asper special conditions of theconsitions of sale

1570 2014 P & T Achitects & Engineers Ltd Proposed Residential Redevelopment of 1 CoronationTerrace 1 Coronation Terrace, Hong Kong I.L. 100 S.B. SS.2,

S.B R.P., S.E. BD 2/2120/10 May 2014

Investigate the impact of ashared party wall from theadjoin site built over andencroached into the captioned

1571 2014 Simon Kwan & Associates Lam Tin Complex 1 Hing Tin St. (Cnr of Tak Tin & Hing TinSt. Lam Tin) GLA - NK 595 52RG (Inform:7248) June 2012 (PC)

How the architect dealt withdisputes between thecontractor and client

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1572 2014 A+T Design Ltd Residential Development at No. 81 Broadcast Drive No. 81 Broadcast Drive, Kowloon NKIL No. 5099 BD 2/4041/ 05 April 2011 Sun Shading Device

1573 2014 LWK & Partners (HK) Ltd. Proposed Commercial and Residential DevelopmentTseung Kwan O Area 57A Tseung Kwan O Area 57A TKOTL 74 BD 2/9136/97H 17 February 2005

To look at the reasons ofdeveloper choose projectmanager instead of Architectact as team leader

1574 2014 Integrated Design Associates Ltd Residential redevelopment at No. 1 & 1E Lasalle Road No. 1 & 1E La Salle Road, Kowloon Tong,Kowloon NKIL 2617 BD 2/4040/05 June 2009

Difficulties encountered inapplying architect'sphilosophy and environmentalfriendly building design

1575 2014 Oval Partnership Ltd No. 5 Star Street 3-5 Star Street, Wan Chai, HK I.L. 2837 s.C ss 1 & s.C. R.P. BD 2/3027/07 June 2010 Negotiation on service laneexemption

1576 2014 P & T Achitects & Engineers Ltd Composite Redevelopment at IL 2147 Haven Street 32-50 Haven Street, Causeway Bay, HKI.L. 2147 S.D SS.1, S.D R.P,S.E SS.2, S.E SS.3, S.ESS.4, S.E SS.5, S.E.R.P.

BD 1/3014/09 June 2014

Building massing controlledunder Iease, BO and OZPand the differentiation ofarchitect's approach amongnew and old lease

1577 2014 KLS International Architects & Planners Co. Ltd. Proposed Alteration & Addition Works of Optimall(Tsuen Wan Hoover Plaza) 118 Chuen Lung Street, Tsuen Wan TWTL 320 BD 2-3/9096/89/5 March 2014 (BA 14)

How architect overcomechallenges to transform an oldbuilding to meet new designrequirement

1578 2014 A. Lead Architects Limited Proposed 2-storey Residential Development No. 4 Suffolk Road, Kowloon Tong,N.K.I.L. 842 N.K.I.L. 842 BD 2/4005/11 April 2014 BD Tightening of basement

area approval of low-density

1579 2014 Leigh & Orange Limited Estate Revitalization scheme(ERS) of Ping Shek EstateKowloon

Ping Shek Estate, 2 Clear Water BayRoad, Ngau Chi Wan, Kowloon NKIL 5182 R.P ICU Ref: HD (ICU)E

3/097(K) AA (18) May 2014 Construction of phasingworks

1580 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK)Limited

Apartment No. 16 Ventris Road & No. 3 BroadwoodRoad, Happy Valley, Hong Kong

No. 16 Ventris Road & No. 3 BroadwoodRoad, Happy Valley, Hong Kong

I.L. No. 5491 R.P & I.L. No.5492 BD 2/3022/08 June 2014 Pereparation works and

application for occupation

1581 2014 Archiplus International (HK) Ltd. Proposed Residential Redevelopment No. 38 Ming Yuen Western Street, NorthPoint

S.A. S.S. 19, S.A. S.S. 20S.A, S.B.R.P BD 2/3017/07 May 2011 (OP)

August 2011 (PC) Particular Site Constraint

1582 2014 Andrew Lee King Fun & Associates 58 Boundary Street No. 58-66 Boundary Street K.I.L. 7658, 7685, 7668,7669, 7678 S.A & RP BD 2/4003/10 October 2014 The role of architect in an

atypical team organization

1583 2014 P & T Achitects & Engineers Ltd The Wings II Proposed Development at Tseung KwanO Area 66B TKO. TL 76

Po Yap Road, Tseung Kwan O Area 66B,NT

Tsueng Kwan O Town Lot.76 BD 2/9038/10 31 Mar 2014

Non-traditional podium designchallenge due to lease andstatutory constraints

1584 2014 Spiral Architectural Design Limited Redevelopment of House No. 16, Tsing Tai Road, Tuen Mun 754 in DD 379 BD 9094/12 Oct 2014

Process, difficulties andsolutions to balance bothconsiderations at developerand lands department inLease Modification

1585 2014 Ronald Lu & Partners (HK) Ltd Seascape Villa at Tsing Lung Tau 67 Castle Peak Road, Tsing Lung Tau 67 BD 2/9129/06 7 Oct 2013

Architect's response to dealwith the issues raised by theLands Department inparticular with one matter thatcaused the unusual prolongedprocedure to obtain anapproval from the Lands

1586 2014 Ronald Lu & Partners (HK) Ltd Larvotto Proposed Residential Development at Alcil129, Ap Lei Chau Praya Road, Aberdeen, Hong Kong 8 Ap Lei Chau Praya Road AP.I.L. 129 BD 2-3/2038/99H/6 Dec 2010 Noise Mitigation

1587 2014 Wong & Ouyang (HK) Ltd. Redevelopment of Caritas Medical Centre Phase 2 111 Wing Hong Street, Sham Shui Po,Kowloon

NKIL No. 4715, NKIL No.5542 & EXT RP BD 4067/04 November 2013

The efficiency of circulationand internal operation designadapted in the newambulatory and rehabilitation

1588 2014 Design 2 (HK) Ltd. An 18- Classroom Primary School at Tai Pak Tin Street,Kwai Chung, N.T. 99 Tai Pak Tin Street, Kwai Chung, N.T. GLA- KT 1159 ASD Pogramme

No.307EP August 2009 Relationship between siteconstraints and overall design

1589 2014 Hsin Yieh Architect & Associate Residential Development at 15 &16 Wang FungTerrace, Hong Kong Tai Hang Road, Wang Fung Terrace I.L 6408 SS2 BD 2/8020/07 September 2012

Efficiency of constructionassembly problems in relationto the choices of setting outpoints, manpower, tools andsequences in relation to costand time complexity in thepoint of view of contractorsand clients

1590 2014 Omar Yeung Arch & Assoc. Ltd Redevelopent of Provincial House of The FranciscanMissionaries of Mary

104 Boundary Street, Kowloon KIL No.2375 K.I.L 2375 BD 2/4070/08 22 February 2011 (OP)

25 February 2011 (PC)The role of an architect inproject management

1591 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK)Limited Manulife Financial Centre 223-231 Wai Yip Street & 39 King Yip

Street, Kwun Tong, Hong Kong K.T.I.L. on 744 BD 2/4047/96 December 2007 Design constraints &problems under lease

1592 2014 Paliburg Development Consultant Ltd. Alteration and Additions (A&A) Work at 14/F at theExisting Royal Oriental Hotel 30-38 Sa Po Road, Kowloon City N.K.I.L. 5754 BD 2-3/4342/78/16 June 2013 (Form BA14

Acknowledgement Letter)

Details on the cost and timeimplication for the leasemodification

1593 2014 Spence Robinson LT Limited Silka West Kowloon Hotel (Dorsett) 46-48 Anchor Street, Tai Kok Tsui,Kowloon KIL 6374 BD 4/4028/01 23 Feb 2005 (OP); May

2006 (PC)

Obstacle and solutionregarding certificate ofcompliance application

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1594 2014 Wong Tung & Partners Ltd Podium Portion (Phase 1) of Tseung Kwan O Area 56Comprehensive Development 9 Tong Yin Street, Tseung Kwan O TKOTL 72 BD 2/7196/98 (2) Jan 2011

Design on "Building bulk" &"Circulation" of shopping Mallin connection to the statutoryconstraints & exemption

1595 2014 Leigh & Orange Limited Alteration works of station areas and commercialfacilities at Shatin Station Shatin MTR Station, Shatin, NT STTL 561 BD 22-3/7808/08/02 Nov 2013

How did the Architectminimised disturbance andrisk to passengers duringconstruction period in terms ofsafety & construction

1596 2014 MLA Architects (HK) Ltd Kennedy Park at Central No. 4 Kennedy Road, Mid-Levels, HK IL 1381 sA & sB RP BD 2013/08 March 2014 (OP) Exemption of E.V.A

1597 2014 P & T Achitects & Engineers Ltd Industrial Development at 2-6 Fui Yiu Kok Street, TsuenWan

No. 2-6 Fui Yiu Kok Street, Tsuen Wan,NT TWTL 30 and 120 BD 2/9263/10 April 2014

To discuss how the architectbalances and justifiesbetween client requirement,design intention and site

1598 2014 P & T Achitects & Engineers Ltd Renovation for Hong Kong Japanese School Primary 157, Blue Pool Road, Happy Valley I.L. 8379 BD 2-3/086/87 Aug 2013 Contruction Time

1599 2014 K & W Architects Limited Composite Development at 42-44 Belcher's Street 42-44 Belcher's Street, Kennedy Town,HK I.L. No.953 sec C, sec D BD 2/2038/04 January 2011

The application of TemporaryOccupation Permit (TOP) andthe required statutorysubmissions as per buildingregulations

1600 2014 ARCA Ltd. Kau Yan Church Renovation 974 High Street, Hong Kong I.L. 829 MW12040171AMO:AM89-0410 Dec 2013 (PC)

Conservation and rectificationof previous repair work of theantique materials, includingwashed-granolithic façadeand traditional Chinese tiles

1601 2014 Wong & Ouyang (HK) Ltd. Main Clinical Block & Trauma Centre, Prince of WalesHospital 30-32 Ngan Shing Street, ShaTin, N.T GLA ST-43 ASD 6367 April 2010

Alternative method of timemanagement in fast trackproject

1602 2014 P & T Achitects & Engineers Ltd Residential Redevelopment at 10, 12, 16 & 18 Pollock'sPath, Hong Kong

10, 12. 16 & 18 Pollock's Path, HongKong

R.B.L. 513 R.P. and R.B.L.540 s.A BD 2/2030/02 May 2007 (OP) Extension of time issue

1603 2014 Ronald Lu & Partners (HK) Ltd HKYWCA Conference Centre and Guesthouse South Lantau Road, San Shek Wan,Lantau Lot No. 727 in DD 332 BD 2/9020/04 Aug 2007 (OP); Sep 2007

(PC)Architectural solution onE.O.T. & V.O. arrangement

1604 2014 P & T Achitects & Engineers Ltd Residential Redevelopment at RBL No 589 and No.590, the Peak 37 Severn Road, The Peak, Hong Kong RBL 589 & No. 590 BD 2/2049/05 Jan 2012 Sustainable design integration

1605 2014 TFP Farrells Ltd C701 Sheung Wan Station 199 Des Voeux Road Central SPANS Lots C704-PM089 April 2012

Constructual obligation of theArchitect between traditionalbuilding contract and MTRCprojects

1606 2014 P & T Achitects & Engineers Ltd Kwai Chung Estate Phase 5 Sheung Kok Street, Tai Wo Hau, KwaiChung, NT N/A N/A March 2005 (PC) Severe site constraints &

slope maintenance issues

1607 2014 P & T Achitects & Engineers Ltd CCC HeepWoh & SKH St. Thomas's Primary School atFuk Wing Street

School A: 145 Pratas Street, Sham ShuiPo KowloonSchool B: 18 TonKin Street, Shan Shui PoKowloon

GLA-NK 712

School A: ASD55/95050/CW0/006-07/BPSchool B: ASD55/92050/CW0/007-07/BP

May 2011The role of architect played innoise and acoustics control inthe whole building process

1608 2014 Leigh & Orange Limited Adventureland Building 531 Mystic Manor & ExternalArea Development

Hong Kong Disneyland Theme Park,Lantau Island C.K.W. Lot No. 1 R.P BD 2/9901/01

(531)(P) January 2013

How to overcome the designand contruction challenges ofthe themed faced & showornaments in architecture

1609 2014 Wilkinson and Cilley Limited Additional Floor on Existing Golf Cart Storage The Hong Kong Golf Club, 1 Fan KamRoad, Sheung Shui, New Territories

The Remaining Portion of LotNo. 942 in D.D. 94 BD 2/9021/04 May 2005 (OP)

Architect's role, responsibilityand solutions to aforesaidissues in order to keep theproject programme in time

1610 2014 Wong Tung & Partners Ltd Residential Development at Hung Shui Kiu, Yuen Long 88 Hung Yuen Road 4331 IN D.D 124 BD 9138/04 March 2011 Architect's role where an in-house contractor is engaged

1611 2014 Studio One Design Limited Digital Savvis Data Centre 33 Chun Choi Street, Tseung Kwan O 39 BD 2-3/9042/96 March 2014 Relocation of gensets andfuel supply systems onto roof

1612 2014 CYS Associates (HK) Limited Alteration & Addition Renovation Works at Oi ManShopping Centre Oi Man Street, Ho Man Tin Kowloon KIL 9826 RP

HD(ICU) E3/052(K)AA(14)-D,HK(ICU)

May 2013 (BA 14) Phases Division

1613 2014 Ronald Lu & Partners (HK) Ltd Residential Development at Lot No. 1739 DD 122 Castle Peak Road, Ping Shan,Yuen Long, NT IL 1739 BD 2/9075/01 Dec 2005

The pros and cons of in-house main-contractor, howarchitect to have a goodcommunication between clientand main contractor and tomaintain good relationship

1614 2014 Ronald Lu & Partners (HK) Ltd Ma On Shan St. Joseph's Secondary School Mos. St. Joseph's Secondary School,Hang Kwong St., Ma On Shan, NT GLA - ST 198 All 317 Programme

No. 8025 EC PC: 20 Dec 2004 Extension of Time

List of projects used in HKIA/ARB Professional Assessment 2007 - 2014

No Year Name of Company Project Title Address Lot No BD File Ref.Date of OccupationPermit / PracticalCompletion (month/year)

Special Topic

1615 2014 P & T Achitects & Engineers Ltd School A (324EP) - Primary School at Hiu KwongStreet, Sau Mau Ping

Hiu Kwong Street and Sau Ming Road,Sau Mau Ping, Kwun Tong, Kowloon NK 722 ASD 102/5815 &

6736/EA/9AM011 May 2008Environmental implication onthe end product and how thearchitect overcome the issue

1616 2014 Andrew Lee King Fun & Associates 133 Hoi Bun Road 133 Hoi Bun Road, Kwun Tong, Kowloon KTIL 756 BD 2/4050/08 16 May 2011Architect's inevitable designconstraints from prescriptivecontrol of Building

1617 2014 P & T Achitects & Engineers Ltd Grandeur Terrace 88 Tin Shui Road TSWTL 28 BD2/ 9030/ 00H (P) Dec 2002 Short Master Programme

1618 2014 Wong Tung & Partners Ltd Proposed Commercial/ Service Apartment at 138,Yeung UK Road, Tsuen Wan, N.T 138 Yeung Uk Road, Tsuen Wan, NT T.W.T.L. No. 406 Aug 2005 Architectural Strategies to

tackle environmental issues

1619 2014 Wong Tung & Partners Ltd Ocean Shores (Phase 2) Residential / RetailDevelopment at TKO-TL No 55 Tseung Kwan O, 8, O King Road TKOTL NO 55 BD 9156/97 October 2003

Explore the difficulties inbuilding process of a multi-phase building project

1620 2014 Wong & Ouyang (HK) Ltd. Redevelopment & Expansion of Pok Oi Hospital Au Tau, Yuen Long, New Territories Lot 00 1630 in DD 115 BD 2/9164/00 Apr 2006 Circulation Efficiency

1621 2014 David S.K. Au & Associates Ltd. Proposed Printing Factory Extension at Tseung KwanO Industrial Estates N.T (Phase 2)

7 Chun Cheong Street, Tseung Kwan OIndustrial Estates, Tseung Kwan O, N.T. TKOTL 39 BD 2/9227/11 January 2014

Client's late decision onadding an extra floor duringconstruction period

1622 2014 Ronald Lu & Partners (HK) Ltd Design & Construction of Residential Training Complexfor the Juveniles at Tuen Mun, N.T.

Yeung Tsing Road, Area 31, Tuen MunNew Territories TM 407 ASD 201/6712/SSL

399 Aug, 2006 Design Consideration of HighSecurity Building

1623 2014 Rocco Design Architects Limited HKEX Next Generation Data CentreJunction of Chun Ying Street and ChunKwong Street, Tseung Kwan O IndustrialEstate

Section C of Tseung Kwan OTown Lot No. 39 andExtension Thereto.

BD 2/9155/0 August 2012 Sustainability DesignConciousness for Leed Cert.

1624 2014 Dennis Lau & Ng Chun Man Architects & Engineers (HK) Heya Green-Urban Renewal Wai Wai Road, Po On Road, Tonkin N.K.I.L. No. 6448 BD 2/4037/04 November 2013 Urban redevelopment

1625 2014 Aedas Limited Silverstrand 850 Clear Water Bay Road, ClearwaterBay, Sai Kung, NT D.D 224 Lot 369 BD 2/9048/04 OP: 22 Aug, 2006

How an architect should/could strive to upholadarchitectural excellence,especially when client'sinvolvement may interferewith the architect's intent

1626 2014 Andrew Lee King Fun & Associates Design- Build- Operate a District Cooling System(Phase 2) at Kai Tak Development 33 Shing Kai Road, Kowloon HK GLA- NK 765 EE 0/WC/31/20 July 2013

Constraints of a design &build contract for a BSdominant building

1627 2014 LWK & Partners (HK) Ltd.Proposed Composite Development No. 44A, 44B and46 Belcher's Street, 11 Rock Hill Street, Kennedy Town,I.L 953 R.P. Hong Kong

No. 44A, 44B and 46 Belcher's Street, 11Rock Hill Street, Kennedy Town I.L.953 R.P BD 2004/08 March 2014 Mitigation of variation order in

a project

1628 2014 A. Lead Architects Limited 4 Monmouth Terrace 9K Kennedy Road, Hong Kong I.L. 8435 BD 3013/08 1 Nov 2010 Reuse of existing foundation

1629 2014 Ronald Lu & Partners (HK) Ltd A 30-Classroom Primary School of Development nearChoi Wan Road and Jorden Valley, Kwun Tong

78 Choi Ha Road, Kowloon Bay, KwunTong GLA NK 771

ASD55/92050/CWO/003-009/BP

July 2011The ambiguity andinconsistency betweencontract documents and

1630 2014 Ronald Lu & Partners (HK) Ltd ASD School Improvement Programme Final Phase(Package 4) Pui Ying College

S361 Pui Ying College, Wo Che Estate, 9Fung Shun Street, Shatin, N.T. BO103 Plan No, STM6154 ASD

303/6487/EX/E20/S3 May 2005 Delay of master programme

1631 2014 LWK & Partners (HK) Ltd. Residential Redevelopment at No. 44, 46, 48 & 50 CHKRd.

No. 44,46, 48 & 50 Chung Hom KokRd,HK R.B.L. No. 811 BD 2/2043/08 February 2014 Implications from changes in

building regulation

1632 2014 LWK & Partners (HK) Ltd. Proposed Development at Lot No. K.I.L. 1124 SheungShing Street, Ho Man Tin, Kowloon

Sheung Shing Street, Ho Man Tin,Kowloon K.I.L. 11124 BD 4076/04 15 Jan, 2009 (Phase 1)

23 Nov, 2009 (Phase 2) Pros & Cons of CM Contract

1633 2014 Hsin Yieh Architect & Associate Festival City Phase 3 1 Mei Tin Road, Tai Wai STTL 529 BD 2/7897/99/2 November 2010 OP Arrangement

1634 2014 Ronald Lu & Partners (HK) Ltd Po Leung Kuk Fung Ching Memorial Primary SchoolImprovement Program No.2 Pui Shing Road, Tseun Kwan O Area 37 Tseung Kwan O BD 4/3073/02 (P) September 2005

How does the architectconcern with extend of time(EOT) application by

1635 2014 LWK & Partners (HK) Ltd. Proposed Residential No. 116 Pokfulam Road 116 Pokfulam Road, RBL 174, HK RBL 174 BD 2007/86 August 2001 Special Site Constraints bysurrounding site context

1636 2014 LWK & Partners (HK) Ltd. A&A Works of House 182 at 93 Repulse Bay Road 93 Repulse Bay Road, Hong Kong 1025 BD 2027/85 August 2011 Structural constraint in A&Adevelopment

1637 2014 LWK & Partners (HK) Ltd. Proposed Residential Development at No. 1 Tung ShanTerrance, Hong Kong (3523) No.1 Tung Shan Terrance, Hong Kong IL 2933 BD 3099/97 June 2002 (OP)

August 2002 (PC)GFA exemption of small scaledevelopment

1638 2014 CYS Associates (HK) Ltd Proposed Residential Development at Discovery BayNorth, Phase 15 Discovery Bay North, Lantau Island 385 BD 2/9060/06 February 2011 A&A Works After OP

Issuance

1639 2014 Aedas Ltd Manulife Tower A&A Works 169 Electric Rd. North Point, HK I.L. 1395, R.P.M.L. 281 SA,EXT M.L 277 S.C S.F. & EXT BD 2-3/3022/84/3/2 August 2012 Factors in A&A works that

alter end result from original

1640 2014 A & B Design Consultants Limited Proposed Alteration from Industrial Building Into DataCentre

2 Chun Yat Street, Tseung Kwan OIndustrial Estate, Hong Kong T.K.O.T.L. 39s.F BD 2-3/9180/95/P November 2013

The architect's method ofcombining the highestsecurity design with thestatutory requirements