Brantley, Anna .l OFrom:Sent:To:
Cc:Subject:
Attachments:
Brantley, AnnaTuesday, April 05,2011 1:38 PM'[email protected]';'[email protected]';'[email protected]';'[email protected]'; Zell, David; Watson, Stephanie M.; Pelz, Susan
Morgan, Steve
Sarasota CCSWDC #130542409-S6Ot Phase I Seq I GCCS construction certificationapproval 4-5-201I.pdf (SECURED) - Adobe Acrobat ProfessionalSarasota CCSWDC #130542-009-50-08 Phase I Seq 1 GCCS construction certifcation approval4-s-20t1
Attached please find Certification of Construction Completion Approval document for the subject Solid Waste
f'acility. You will only receive this electronic copy of the document.
NOTD: If you have questions concerning the content of the document, please contact the DEP permit processorster,'e.rnorgan'iJrdep. state.fl .us
Acrobat Reader 6.0 or greater is required to read this document. It is available for downloading at:http :l/rrlrl .adobe.corn/productslacrobat/readstep. Irtrnl
If I may be of assistancq please contact me.
Anna
Anna BrantleyAd m i ni str ativ e Asslsfant //FL DEP / SWD / Waste Management1 3051 North Telecom Parkw ayTemple Tenace FL 33ffi7-A629Tel: 81 il632-7600, Ext. 377Fax: 813/632-7664an n a. b r a ntl e v@d e p. state. f L u s
The Department of Environmental Pratection values your feedback as a customeL DEP Secretary Hershel T. Vinyard Jr is commifted tocontinuously assessing and imprcving the level and quality of services provided to you. Please take a few minutes to comment on the qualityof sewice you received. Sinply clbk on this link to the DEP Customer Survey. Thank you in advance for completing the survey-
eFloridaDepartment of
Environmental ProtectionSouthwest District
13051 North Telecom ParkwayTemple Terrace, Florida 33637 -0926
Telephone: 813-632-7 600
Transmitted e1ectronically only to: leroseGscgfov.net
Ms. Lois Rose, ManagerSarasota County Solid Wast,e Operations4000 Knights Trail RoadNokomis, Florida 34275
April 5, 20LI
RE: Central County Solid Waste Disposal Complex, Sarasota CountyPhase I, Sequence 1 Gas Collect,ion/Control System ConstructionCertificationPermit No.: 1-30542-009-SO/08WACS No. : SWD/58/51-61-4
Dear Ms. Rose:
The Department has reviewed the following information prepared in support ofthe Certificat,ion of Construction Completion for the Phase I, Sequence 1 GasCollection/Control System construcLion originally submitted August l-3, 20L0.
Centraf County Sol-id Waste Disposal- Compfex Phase I Landfiff Gas Coffectionand Control- System Sequence J- Certification of Construction Compfetion Report,August 201-0, received on August 1-3, 201-0, prepared by HDR Engineering, Inc.
Response t.o Request for Additionaf Information - Centraf County Sol-id WasteDisposaT €x, Sarasota County, Phase I,
^9ce 1 Gas Coffection/Control-
System Construction Certification.., dated September 30, 201-0 (received October1, 201-0), prepared by HDR Engineering, Inc.
Phase I Hot Spot Issue - Status and Proposed Response Pl-an, Centraf CountySoLid Waste Disposaf Facil-ity..., dated December 9, 201-0 (received via e-mail-December 9, 20J-0), prepared by HDR Engineering, Inc.
Phase I Hot Spot Issue - Impl-ementation of Phase II of Hot Spot Response Pfan,CentraL County Sofid Waste Disposaf Facil,ity..., dated 'January l-2, 201-1-(received via e-mai7 January L2, 2011-), prepared by HDR Engineering, Inc.
Phase I Hot Spot Issue Restr>onse Pfan - Phase II Landfill- Gas Header Damage andRepairs, Sarasota County Central- County Sofid Waste Disposaf Facifity..., dated,Tanuary 28, 201L (received via e-mai7 ,lanuary 28, 20LL), prepared by HDREngineering, Inc.
Based on review of construction certification reports referenced above, theDepartment has determined that the following unapproved construcLion deviationoccurred during the Phase I, Sequence 1 Gas Collection,/Contro1 Systemconstruction:
l-. The as-built drawings show that the condensate knockout pots that werepart of the permitted design of the 1andfi11 gas collection/control systemwere either not constructed or replaced with other structures. The permitteeconfirmed in the September 30, 2010 submittal referenced above that thecondensate knockout pots were not constructed.
Rick ScottGovernor
Jennifer CarrollLt. Governor
Herschel T. Vinyard Jr.
Secretary
Ms Lois Rose, ManagerSarasota County Solid Waste Operations Page 2 of 2
2. Section 3.4 of the approved Engineering Report sLated, .rnitially, Lwoblowers will be installed to collect the gas from the landfill. " and *Oneblower will be operat,ed aL any given time to insure continuous sysEemoperation. T1pical1y, the blowers will be utilized on an alternating basis toreduce wear and tear, and to allow service on one of the blowers while theother is operating." The as-built drawings show and the permittee confirmed inthe September 30, 201,0 submittal referenced above that onlv one blower wasinstalled.
3. The construction certification report indicated that the constructedCondensat,e Sump S-5 was a 48-inch diameter condensate sump, instead of thepermitted 36-inch diameter condensat.e sump design. Sheet 00C-03 of the as-built drawings indicated that, Condensate Sump S-5 was consLructed at thelocation where a knockout pot was to be instalfed in the gas header lineimmediately prior to the landfill flare station and Lhat the knockout pot wasnot constructed. These construction changes were confirmed by the permittee inthe September 30, 2010 submittal referenced above.
Based on review of construction certification reports and Phase I Hot Spot,Issue reports referenced above, the Department has d.etermined Lhat, except forabove noted construction deviat,ions, t,he phase I, Sequence 1 GasCollection,/Control System was constructed substantially in accordance with theapproved design and the construction requirements of permit, No. 130542-009-sc/08.
The Department therefore approves the cert.ificaLion of construction completionof the Phase I, Sequence f Cas Coflection/Controf System and approves theoperation of the Phase I, Sequence 1 Gas Collection,/Control Svstem inaccordance with Permit 130542-007-solo1,. If you would like to discuss anyissue in this lett,er, please contact me aL (813) 632-7600 ext. 385.
f""rorlo" phase r, sequence 1 cccs cttr,r.tion cerrificarion
Q i nna-ol .'efrrvu! vrr:}y ,
-=1--t--'2'/ -r{ :: ---t' . -r
Steven G. MorgnhSolid Waste Sb,ciionSouthwest District
SM/sgmcc: Gary Bennett, Sarasota County, gbennettgscgov-neC
Cliff Koenig, P.E., HDR Engineer,Jason Tirunons, P.E., HDR Engineering, Inc. [email protected] 2e11, FDEP Tampa -Air Section (e-mai1)
^ Stephanie Watson, FDEP Tampa (e-mail)
/,1 Susan Pe1z, P.8., FDEP Tampa (e-mai1)r lNJ\\J
oMorgan, Steve
From:Sent:To:Gc:Subject:Attachments:
Tracking:
Morgan, SteveFriday, September 10,2010 3:34 PM'Lois E. Rose''Koenig, Cliff;Zell, David; Pelz, Susan;Watson, Stephanie M.Sarasota CCSWDC Phase I Seq 1 GCCS construction certifcation RAlSarasota CCSWDC Phase I Seq 1 GCCS construction certifcation RAl.pdf
Recipient
'Lois E. Rose'
'Koenig, Cliff
Zell, David
Pelz, Susan
Watson, Stephanie M.
Read:9/13/20107:47 AM
Read: 9/13/2010 7:56 AM
Read: 9/10/2010 3:39 PM
Lois:
Attached is an electronic copy of the Request for Additional Information (RAl # 1) letter for the aboveconstruction certification. A hard copy was not sent via US Mail.
This is the only electronic copy you will receive. Acrobat Reader 6.0 or greater is required to read this document,and is available for downloading at: http://www.adobe.comlproducts/acrobaUreadstep.html
Please feel free to e-mail or call me if you have any further questions.
Steven G. Morgan, Solid Waste SectionFlorida Department of Environmental ProtectionSouthwest District Office13051 North Telecom ParkwayTemple Terrace, FL 33637-0926
phone - (81 3) 632-7600 x385fax - (813) 632-7664e-mail - [email protected] .us
October 11, 2010
Steven G. MorganSolid Waste SectionSouthwest District Oflice13051 North Telecom Parkwavffi;; i;#.; i'i"l'u"11[ii -ontu
RE: Request to Extend Gas Collection and Control System OperationCentral County Solid Waste Disposal Complex, Sarasota CountyPhase I, Sequence I Gas Collection/ Control System Construction CertificationPermit No.: 130542-009-50/08WACS No.: SWD 158151614
Dear Mr. Morgan:
On behalf of Sarasota County, HDR Engineering, Inc. (HDR) is requesting an extension to operate
the gas collection and control system (GCCS) at the Central County Solid Waste Disposal Complex.The current operational history of the GCCS is summarized below from the Florida Department ofEnvironmental Protection's (FDEP) request for additional information dated September 10, 2010.
In accordance with Specific Condition #C.l.b., temporary operation of the system wasauthorized for up to .l80 days to allow for system start-up and operational adjustmentswhile the iertificatton of construction completion and permit modification submittalsand approvals required by this spectfic conditionwere campleted. On May 25, 2010, the
Department's Air Section received ntotification of start-up operations for the Phase Ilandfill gas collection and control system flare station at the Central County SolidWaste Disposal Complex on May 18, 2010. Based on the May 18, 2010 start-up date,
authorizationfor the lemporary operation of the system expires on November 19, 2010.
We request an additional 90 days to extend temporary operation of the GCCS from November 19,
2010, to February 17,2011. This would allow FDEP time to review the construction certificationreport for completeness and approve the GCCS operation permit modification submittal. Based onthe construction certification report response letter dated September 30, 2010, HDR believes there are
no significant deviations of the GCCS components as constructed which would require a constructionpermit modification since they do not pose an impact on the environment. The GCCS is installed and
operating as intended based on the original and permitted design. .Continued operation of the GCCSwould allow the Central County Solid Waste Disposal Complex to reduce landfill gas emissions.
Deg& Of Envirilnmental Pmtection
ocT | 3 2010
: $outl'mest Distrir:t
HDB Engineering, lic.80792 082608A.doc
5426 Bay Cenbr Drive
Suite 400
Tampa, FL 336093444
Phone (813) 282-2300
Fax: (813) 282-2430
iwu.hdainc.cdn
Mr. Steven G. MorganOctober I l, 2010Page2
If you have any questions or concerns regarding the commentplease contact me at (Sl3)262-2776 or (813) 270-8053.
Sincerely,HDR Engineering,Inc.
Richard A. SiemeringSolid Waste Section Manager
Spencer Anderson, P.E., Sarasota CountyJack Gibson, Sarasota CountyGary Bennett, Sarasota CountyLois Rose, Sarasota County
responses or attached documents,
e?;*Cliff Koenig, P.E.Engineer of RecordFlorida PE No. 64078
cc:
HDR Engineering, lnc.
Florida Departmeo
ntofEnvironmental Protection
Southwest District13051 North Telecom Parkway
Temple Terrace, Florida 33637 -0926Telephone: 8L3-632-7 600
a. Please revise this section to indicaLe whetherPhase I Sequence 1 gas system will be installed whenreaches final design grade or as part of the Phase Iconstruct.ion.
Charlie CristGovernor
Jeff KottkampLt. Governor
Mimi A. DrewInterim Secretary
TranEmitted. electronically onJ.y tol [email protected]
Ms. Lois Rose, ManaglerSarasota County Solid Waste Operations4000 Knights Trail RoadNokomis, Florida 34275
September 10, 20L0
RE: Central County SoLid Waste Disposal CompLex, Sarasota CountyPhase I, Sequence 1 Gas Collection./Control System Construction CertificationPermit No.: 130542-009-S0/08wAcs No. : slrtD/SB15L6L4
Dear Ms. Rose:
The DeparLment has reviewed the above referenced Certification of ConstrucLion ofthe Phase I, Sequence I Gas Collection and Control System and supporting documentsreceived on August 13, 2010. Based on the Department's review, Lhe certificationof construction is not approved. This is the DepartmenL's Eire!_request forinformation. Please provide the information fisted below promptly.
CERTIFICATION OF CONSTRUCTION COMPI.ETION . DEP Form #52-701.900(2)
l-. Deviations from Plans and Application Approved by DEP: As indicated by theconunents provided be1ow, deviations from the plans and application approved by theDepartment do not appear to be l-imited to changes listed in Section l-.0 of theconst,ruction completion report, nor does it appear Lhat "no significant deviationsaaartrrad rftrrinn COnSLrUCtiOn,,. P]eaSe verify and reviSe the narrative in SeCtiOnvs ve! 4rrv
1.0 of the report to identify all changes in plans and a description of the causeof the deviations from the plans and application approved by the Department, inaccordance with Specific Condition #8.2.a. (3) of Permit No. 130542-009-SC/08.
2. Except for Lhe change from a dual containment condensate force main pipe toa single pipe discussed in Section 4.5 of the construcLion completion report,Department records do not appear to indicate that a permit modification wasapplied for and issued by the Department for the construction deviations discussedin Section 1.0 of the construction completion report and identified in theDepartment comments provided below, or that these deviations were otherwiseapproved by Lhe Department in accordance with Specific Condition #a.3.a. of PermitNo. 1-30542-009-SC/08. This appears to constitute a violaLion of Rule 62-701.320(1), F.A.C. Please verify and provide an explanation of why prior approvalof these changes was not obtained from the DeparLment, in accordance with SpecificCondiLion #A.3.a. of Permit No. 1-30542-009-SC/08.
CERTXFXCATION OF CONSTRUCTTON COMPI,ETION REPORT
Section 1.0:
the remainder of thethe southeast cornerSequence 2 gas system
Ms Lois Rose, ManagerSarasota County Solid Was Page 2 of 3
b. fn addit.ion to the replacenent of a knockout pot with an HDPE wlze atthe southeast corner of Phase I, all other knockout pots that were part ofrha narmi fted design of t.he Phase f gas system do not, appear to have beenurrv yv! rrrf e
constructed. Department records do not appear to indicate that a permitmodification or prior Department approval was obtained for this constructionmodification. Please verify and explain the cause and/or justification forthis construction modification, including all supporting information and/orcalculations utilized, and revise the appropriate sections of theconstruction cert,ification report accordingly.
4. Section 2.2.4: Section 3.4 of the approved Engineerinq Report states,"Init.ially, two blowers will be install-ed to collect the gas from the landfi11."and "One blower will be operated at any given time to insure conLinuous systemoperation. T1pica1ly, the blowers will be utilized on an alternating basis toreduce wear and tear, and to allow service on one of the blowers while the otheris operating." This sect,ion indicates and Sheet 00C-06 of the as-built drawingsshows that only one blower was installed. This appears to be a deviation from theplans and application approved by the Department in Permit No. L30542-009-SC/08.Department records do not appear to indicate thaL a permit modification or priorDepartment approval was obtained for this construction modification. Please verifyand explain cause and,/or justification for this construction modification,including all supporting information and/or calculations utilized, and revise thissection of the construction certification report accordingly.
5. Section tt.5: This section indicates that constructed Condensate Sump S-5 isa 48-inch diamet,er condensaLe sump, instead of the permitted 36-inch diametercondensate sump design. Sheet 00C-03 indicates that Condensate Sump S-5 wasconst.ructed at the locati-on where a knockout pot was to be installed in the gasheader line immediately prior t,o the landfill flare station and that the knockoutpot, was not const,ructed. This construclion modificat,ion appears to be a deviationfrom the plans and application approved by the Department in Permit No. L30542-009-SC/08. Department records do not appear Lo indicate that a permitmodificat,ion or prior Department, approval was obtained for this constructionmodification. Please verify and explain cause and/or justification for thisconstruction modificaLion, including all supporting informat,ion and/orcalculations utilized, and revise this section of the construction certificationreport accordingly.
APPENDIX G - Phase I lJand,fill GCCS As-Built Drawings
Please provide revised drawings that address the comments provided above andbe1ow, including all necessary details for certification of the construction ofthe GCCS. The drawings may be reviewed, in uheir entirety after the responses tothese requests for information are submitted.
6. Sheet 00C-03A & 00C-03C: Please explain the changes in location of Lheaccess points adjacenL to GW-8 and GW-23.
The following comnent is provided for informational Durposes and does notnecessarily require a reaponse, other than acknowledgem€nt of the conunent.
7. rn accordance with Speci-fic CondiLion #C.1.b. of Permit No. 130542-009-SC/08, operation of Lhe gas coflect.ion and control system is not authorized untilthe const.ruction certification is approved and a modification to the facility'soperation permit is issued that, authorizes operation of the system. PermitModification #130542-010-SO/MM, authorizing operation of the GCCS onceconst,ruction certification is completed and approved by the Department, was issuedon .Tune 18, 2009. However, as indicated above, the certification of constructioncomplet,ion is not approved at the time.
ote Oper
CcsWDC Phase r, Sequenc" f CClonstructj-on Certificationations
Ms Lois Rose, ManagerSarasota County Solid Wast
Ie Oper
CCSWDC Phase I, Sequenc. f eClonstruction Certificati-onations Page 3 of 3
In accordance with Specific Condition #C.1.b., temporary operaLion of Lhe systemwas authorized for up to 180 days to allow for system sLarL-up and operationaladjustments while the cerLification of construction compleLion and permiLmodification submittals and approvals required by this specific condition werecompleted. On May 25, 201-0, the Department's Air Section received notification ofstart-up operations for the Phase I 1andfil1 gas col-lection and control systemf1are staLion at the Central County Solid Waste Disposal Complex on May 18, 201-0-Based on the May 18, 20L0 start-up daLe, authorization for temporary operation ofthe system expires on November 19 , 201,0.
Please provide all responses that relate to engineering for design and operation,including DLan eheets, signed and sealed by a professional. engineer. Allreplacement pages should be numbered and include a revision date.
This staff assessment is preliminary and is designed to assist in the review ofthe construction certification Eubmittal. The corEtrents provided herein are notthe final position of the Department and. nay be subject to revision pursuant toad.ditional infomation and further review.
Please be advised that under the provisions of Specific Condition #C.1.b. of theabove referenced permit, operaLion of the gas collection and control system is notauthorized at, this time. The Department requests that you cont,act me to set up amAeElng to discuss bhe issues in this l-etter. P]ease contact me at (813) 632-1600ext. 385.
sM/sgmcc: Cliff Koenig, P.8., HDR Engineering, fnc., [email protected]
David 2e11, FDEP Tampa -air Section (e-mai1)
^Stephanie Watson, FDEP Tampa (e-mail)
-J,Susan Pe1z, P.8., FDEP Tampa (e-mai1)l-N
li\
Sincerel
Steven G.Solid WasteSouthwesL Dis
cwlrPy:,.I.
February 5,2010
Ms. Susan J. Pelz, P.E.Florida Department of Environmental ProtectionSouthwest District13051 N. Telecom ParkwayTemple Terrace, FL 33 637 -0926
Re: Transmittal of Dewatering Plan for Phase I Landfill Gas Collection and Coltlol System
Construction at the Central County Solid Waste Disposal Complex (CCSWDC)
Permit Number 130542-009-SC/08Sarasota County, Florida
Dear Steve:
On behalf of the Sarasota County Solid Waste Operations (Owuer) and SCS Field Services, Inc.
(Contractor),HDREngineering,Inc.(HDR),aSacourtesytotheFloridaDepartmerrtof-Environmental Protection (FDEP), hereby submits 4 copies of the enclosed Dewatering Plan. Should
you have any questions or issues with this plan, please do not hesitate to_ contact me.. We would
appreciate an expedited review of the plan since the contractor will need to dewater in the near future.
Sincerely,
HDR Engineeringr lnc.
t/ z .-
-\\Richard SiemeringSenior Project Manager
Enclosures
Gary Bennett, Sarasota CountyLois Rose, Sarasota CountySpencer Anderson, Sarasota CountyRobert Butler, SCS Field Serviceq
5426 Bay Center Drive
Suite tt00
Tampa, FL 33609-3444
Phone: (813) 282-2300
Fax: (813) 282-2430
www.hdrinc.om.
llBR Ingineering.lnc.
DEWATERING PLAN % ^o
nto'^oro
LANDF;IL GAs COTLECTTON - pHASE I ^4)+ - 'eoQoa
-" 6 P 'oteq'
sARAsorA couNTy cENTRAT couNTy souD wAsrE DrsposAr cor ptt4." "."
r 20/0 "%
yolshct
r 2209031.00
GENERAI
Construction of the landfill gas collection project at the Sarasota County Central County SolidWaste Disposal Complex includes the construction of four gas collection condensate sumps thatwill require temporary dewatering during construction. All four sumps are located within the
limits of County-owned property at the Solid Waste Disposal Complex. If it becomes necessary
to dewater the pipeline trench during construction outside the limits of Phase I, the dewateringwill be pumped to the nearest cleanout, CO 13, 14, or 15.
DEWATERING f{IETHOD
A two-inch or ttree-inch diameter discharge trash pump will be used to dewater each sump. Thepump discharge will be approximately 150 to 200 gallons per minute. One sump will bedewatered at a time and it is anticipated that each sump will require dewatering forapproximately two days.
DEWATERING DISCHARGE
Sump 2 is located within the limits of buried waste. This sump is shown on Sheet 00C 03attached. Liquid pumped during construction dewatering from this sump will be pumped to anearby leachate cleanout riser pipe, LCO-3S, shown on Sheet 00C-03which will allow the liquidto drain back into the landfill leachate collection system. Three sumps, Sumps 3,4, and 5, are
located outside the limits of buried waste. These sumps are shown on Sheet 00C 04. Liquidpumped during construction dewatering from these three sumps will be pumped to the existingleachate storage tank through existing leachate force main cleanouts. Dewateririg from Sump 3would be pumped to cleanout CO 13, dewatering from Sump 4 would be pumped to cleanout CO14, and.dewatering from Sump 5 would be pumped to cleanout CO 15. Cleanouts CO-13 andCO-14 are shown on Sheet C-29. Cleanouts CO-15 is shown on Sheet C-30. A detail of thecleanouts is provided on Sheet C-32. As shown on the detail, the cleanouts are fumished with aCamlock coupler to facilitate discharge into the existing forcemain.
Sarasota County will shut down the leachate pumping system during construction to facilitate theuse of the forcemain for dewatering. SCS will coordinate with the County to make sure that theleachate collection pumps are manually turned off during disposal into the leachate forcemain.
Liquid from dewatering will not be discharged to groundwater or surface water, and it will not be
discharged onto the ground surface.
Dewotering PlonLondfill Gos Collection - Phose I
CONTINGENCY OPERATION
If the primary dewatering pump should fail, a backup pump may be used to dewater the sump. Ifa backup pump is not readily available or if the leachate storage tank is full, dewatering may betemporarily halted. Stopping dewatering will not result in discharge to ground or surface water.
DRAWINGS
Attached are Sheets 00C-03,00C-04, C-29, C-30, andC32.
r\r\t$r\\$r\N
,-\^\-
(
f-\
I
)*\-!=*icoNNEcr To E(|snNc,' BCHATE CIEAI{OUr orP)
=:j=----s===Lp-L-P-- -
rssuED FoR CONSIRUCTbN
Nq"
tE,tl
D(snilc 6'tEAClilrEFORCEI'jAIN
"E:#-r
@MP'II.€D 8T KUCERA I'{TERI{^IIOML INc" OFwil.LorrcHF/, o|ilo tJstNc pHoloGRAuHElRtC UEI|tOOSFnora AlRrAt pHorocMpHs DAIED ApflL ta 2qE.
2. PROPOSD P}IISE I M{A GMOES OESCNED 8r HORENCN€ERINq NC lAilPA FLORIDA
5. CINInACfOR K' PRO/IDE A PF€-CONSIRI,ICNOXSlrRVFr, PROR TO COtaUEI\Ctl{c CONStRUCtbt{AfiMNES. TO VERIFY DOSNilG @NDMONS.
.+. L@ANOX A'iD DENETY OF IfG O(IRICIION Sr$EM, ARE AFPROAUA]E A.IO SUEJE T TO CHAfiGE EASED OIIo{snNc cONDtnoNs-
s. IHE r.llrDF!,L OqS CILtlCnOX STSIAI SHAI 8€CONSTRUCIED IN 2 SECIIENC€S. SEAI,EllcE I SH^ILBE @IISIRIJC'ED UPOII O€P APPROT'A OF P€RHfTAPPUCATP'{. SEOUENCE 2 IS NOT PAfrT OF THE@NSmUCnO[.
6. APPROXTTAIE LOCAIIOII OF PI{ASE t LEIC}IAIEFONCETAN OETAilED FROII RS@RD ORAY'NGS
'rCjraP DRESSER t ltcK€E IXC oAIED APRM99&\GRF' LOCAIION IN FEII'.
7. HEADfR PIPE SI{^IT BE HDPE SDf, '7
AT{D I.AIEMLP1PES $AU 8E HTIP€ SOR 11.
. & BUND FI,ANGE AT AOIX triIOS Of HEAD€R $rLL 9ELOCAIED 20 FEEf OUEIo€ OF p|.|^sE 2 oo||srRucnoilCRAD$IC PI.A}I. ACIT'AL u)CATON TO gE DETERUINEDAFTTR PRE-CONSIRUCNON g'Rl'Er. SEE DEAN.5/D-O5.
9. AII tElcr|^rE cLEAtroLr @NNECnONS S{ [ rU\€ AREIOTE WEIlllElD; NOf SXOWtt FOR CtARlIy.
10. AR AitD FORCEITAIN 9{ilN OfFSET FOR Ct-ARtIy.
11. CdiIDEITEATE FORCET AO{-slrAll CONNECT TO rcO-lr{AS SHOUN IN DEAL 12-06.
12. IF IHE BASE 8ID AT\D ALIERMIE sD ARE AWARoED,It€ @IIIRICIOR SH [ @liiFcr THE lE. HETOER 2.AtRlt-lilE a,fil 4- coltrlEilli/[E RgruRil UNE $OSr| 0rI}E ALIERI{^IE alD TO THE RESPECITI,€ I,ALT,E PIT FoRT}€ EASE dD.
'3, F THE ALIENXAIE ED OPTIOI{ IS SELECIED. THECOTTIRICIOR SMII. NSTTLI BI.JND F|ITFES FOi IIJElrFrDER, AtRul{E Ar{t} FoRcEruN vAL\€ pr sourH oFI}€ KNOCKOI'T POT.
SCAIE r'=5'FORCE TAI}IVALT'E PTI
PHASE ICentral County Solid WasteDisposal ComplexPhasel-Sequencel
Landfill Gas Gollection and Conbof systemISSUED FOR CONSTRUCTION
\',li',rt\t l
==z=_:.+-.LP-:-rj^*-:=_-;"1
SEE NOIE 9 --crrP.) \;t!;l ,t, lltr8'r E-8ott --\iljlrlilrilr ilt'--7' 24^lt6'r HDPESDR 17 ECCE.IIRICREDUCER
\'\,,t \,
HADER OUISDE OFwAsrE TRENCH cnP)
- ROADCRO6SNG
,'(m)
cAssYsrEM PTPING ^**rjn ^
SARASOTA MUMTY FloRroa&ES|[email protected]_
?ara
-tio 6 .*o*rnfin .,FYP) @I ,'
I./
---/ /
I\6r
{
hr,l It\
ii,x4
PLAI.I VIEWSCALE 1'=lOO'
.+0
rrlrrrl>50oz
20
l0
0
-10
IiR
56'r HDPE Sm 17
l"l\ /r I\x-s<-
-a
r'F
3d
r8+00 -
ii' \rl- iilrlr llL.lll 'tl' ir lll
li;iill :tl
t, lt!rl 1lrr ltlll \l
liriltrltlrl 1l
1i,.. lll
rii Ii)' lt1,-'rll
rt,l, ,,
..
-/7/- 31.-(I
- uirm orCONSIRUCTO}T
rf'! ,,trrll,lt/lt\
l\.\t\,/'.\/I \-/
\\"., \\t- ,t \
'j':- - --- -
ROTD CROSSING(r")
- (d-k'\\\\l.*' r \\,lir '. I I
't, I | |
llitl/,_\r \*;i li\iiii)rl,il i"tlr t Il/ I \F \rt\\I .'.t\I /\ \
l: I t\
. 'U^q--FA -.V> AA
^ \z f, :tu-$b'. - . 'h!€/'."4n^ B
"_"ffics419n. 'ola 'b4'
o
-t0
NOIE ARUilE/FORCEy TN UNES NoJ SHOW|{ FOR CLARtry.
L4€'t RcP I
tt,r'n
"or.'ro. ,, I
LA!{DF[! GAS APNG --'lotJTsloE oF w srE I
HEADER TO FI-ARE STATIONPLAN A PROFILE
ot'2FE--f Bgu|mruFBSg:@
tr'i'ffiJ*-G
---€\
o(ISNNG 8? IIDPEsoR fi FoRcEilArN
ti\ -l' \./-RorD cRossrNc/ r \0YP) lE-l
:LAM)FUI GIS-:cor{tRol uMr
-CNOIES:
l- ToPocRAPrff l{flHrN Plt^s€s I lHRotGH rv rfrsCOTP{€D B' KUC€RA INIERNANONAI.
'NA OF
WITIO.'Gil8Y, O}IX) U$NG PHOIOGNA'TUEIRICMEI}ODS FROT AERAL PHOTOGRAPIIS DA]EOAPRIL 12, zOOE.
2. TRB{CH DEP'}t!i ARE C1JRRENILY DESIGTIED TO
BE NO SHAIONER I}IIN + FEET AI{O NODEEPER ITUN 6 FEET FOR AI.l. BPING. STESUIP OEIAIL FOR TOTIL SUUP OEPTH.
5. ONLY PRO'ILE OF HEiDERUilE Ei S}IOWN FORanRtrr. HoilBrE& An ARUNE ll{D ACONoENS IE foRcEnAN SillAll- 8E lNSrArEorN lHE S ilE In€ricll
+. GIS UNE I{ARTERS Slutl BE INs'AU^ED EVERY
JOO FEET NOIINC IOCANON Of HEAOEruNA
5, APPROXTUAIE LOCATT'I OF P]r SE I LElcr{ rEFORC€X^OI OST INED
'ROU RECORD ORANiES
B/ CAIP DRESSER & lIclGL lNC. OIIE) APRILt99& \4ntFY LOCAIIOil n FlEl.O,
6. COr{tRAclOn RESFOT€ArE FOR CONilEC|IlilCHE^OA P|PE tO rllrm|.! GAS CONIROL UNr.col{tR^cron R€sPo}saE FoR coNoENSAIEDRA$TTGE ELECTREAL OOI!.IECIIONS AT,ID PAII ,
coNsrRt cnoil.
t> ? --/ t
g|snNc POnEnPotr crrP)
ROAOcRosslilG
+2'' RCPPIPE SIEVE
tI
JO,' HDPE SDR 17I.ANDRIL GAS PIP'IIGOUTSIDE OF WETE
Gentral Gounty Solid WasteDisposal ComplexPhase 1 -Sequence I
Landfill Gas Collection and Control SystemISSUED FOR CONSTRUCTION
SARASO'IA COUNIT
to'rtg TBSSFUtqzl8Frs ffrEStdutr Pto
"e1.ffi
ffiuE/v|D,
-,.,.\.,....,-\s lft)yf t,',j5c +JXL S' aL iaer * a t1-.s
'ri"i '6;5 1ir 46r^ - ' -
lftrr06f80arE5Lffi@,t7,r$r.
a sr@r'onltr-lrsD clt loFasivtdtlE tr caa costtFm flISD{E lml tg$ /91, B tq5 |fAC't|IEForc4r, tlo Pu? srAnotl InAlm ssapaD eY2G
sfi"alilt"AtCsBetluETr'0,169 nEcoraao lottESB couFGltErEnJcttroacr.BfidN !l!/ald IE XtrE tI' E GflEDl'mroEm'm-
_ lf,rorErcflril.'ql|'mttrctrc- GnqtrG-QlttltcElrE
----Pm€uITsaril ua( Eq
-----ffiusru
-'-fT;D'tl..... -...-.lrG F ooErBE|Dra+E@aI*
tlg=lII
g
f I b. /++..._+ E6tk EAffi coxtqn
-Pled:*nhrso'anrmr mn9tErX Emmf,\o|Ef.
E dl -.---- uA d' tioeostD rrBBe------frAHr rm r ffi
rroFGa nlsg'r trllcS[EE*EI'I
I
IBl
Lt'lI
. TllIYh,t
o udlE!
ADDENDA
FORcErAru PtlllGounty Solid lYaste.Disposal.Complex
PIIASE II GI.ASS I I.ANDFIiTEXPAI|StOSI
GolrsrRucTtolt DnawN GS "r--+:...J
N
(D
iatEs.
I at'qnt l|*D or tlrctrtrj' co]etDlrfsr aorcrtEtli n 6 ut6 l,allq do tr r*Ij uarDctE ,!l:t sio tl,lt stalot lstrE t€r otD {tttaaf .
l. ns|rtFsa w!t${t !atfqE ntEEaruEqB oaFrEZr€lm 11 0&2 tE xr tE !D ,rrltE.lrrs Ds dic@f,ftD utEtE !@r - |E6gFs6trrf. qgrdEr rrrF6o6 6('.im, cr-t7t cn afix,
!.Ettt *rtD*rt dsnE a,adllrt GcatuJi
e;ErEio6o aDaDtorilM.
-.:*-gsr!g*t*-s--t!a[l
g. r|ldE.E rlE__-___mlda|l urtti€F
--i 80F06!D an4ll
-tF.?(!iD
tftt i tDilEIBDTNT
- -. --. *luDD ti@otl' ffi4^'? rGco^tt|{
cti"og
."y"'
Ftlcc ?.{
bd=={ "M
.l@1i: ffirwBtFdaFtr|.Effif,CCW S?ETAIM T'
rrxt {t aEu{IE clErsrr nR$rc@|l'r qsEtFrrL 0il.1!c
z g [nL a tffi.s|]El tB l.u ln. NltroorFnq
godE
t3 !n fl lE r"E
a'EEDa
&IELt-. rnEraiGNFE
'Eilrfixil sltr|! p*
ffi CUI2L rlsu PIEls 5|A- r4-z Emfrr nltjue ro lwt Exrctr rirE{
GrSS r |s E FDt &rarr, SflnilxD rEnoFB trf@€ Arnt!cEf1,' llts t$E[- 9*l]DAG|r,tBf,nm t-$- sEE SEfEffi
r wa jrru rrr c *rtrlrb lalr roat qDqf roq Eott,er snul g tf€sr+' t{|t/t! llgEl !t!u gnrc@ r f. wclME TC E CF.IIiC }E.B ruEElm--|EO+rd- M
ID6r + ta',:,
!, flnrl 8Eq! sat E q.Es r sa r B u.,lll.D. DG T$'ET ro E€ 6DiEEDD TsEst8ffn|!
?. FMD'| UY E !'SA'TD ffi ] .|BED6T- mErdEcraiDEEDuiltlbEdDrDURm.3Gr' 0F rilo tFarcs.
rxrt!ffir(ffir..rE€| ^aaoaru) (sl! iolt 3)
ORCEMAIN EEDDI}.IG
ts FE a.Emr
FtO.
. al. Fc ,rE ||tD tnrS; gru EPNJRE RA'O Ctr€S !5O (m [too{tuLrc 10 8* cs. F?€xo FlExlt s{ll! E uE tRDlcrss tSaaa-E (rsru gtul r€mru@EEtnaom; F sulotto u*-F 20Fe! rvc PPt NldtDNI
ruw.
Br@trI'rc
a AITOMAIE AIR
rGG)errurc u FaaE uLYE w... .GESUG! $ SPFfFar! liG)nrcsr'mmm- affioaDDsM4wG)z E umEAf &sE Pa-maffiNmt{llE t(wr8Eff,{j)zrcrrnrssmm ruV IfE
@nlro nmt c aar@frs'nrusnr!a,t€ffi6) a rtqr o*rss 8r! uLyE ril trID- ra/tR
I&IEIr, fc Ercst tsE arE|lu! saule nat^s€ nllf |'llt 3Etsrl
^o(ssoFEz canm:gc gru. rsqi furusr! mErqrE u0E (amEr rt e BDOaE q tmoxfl @|(lnElq*r coGoHrE Pmiosat lcxtFgr fl46 rDt bElllq Fm rDottfl.Errot!
1*r*4*$qt! rf car r a-
clrsstrE^tpat 0F 50tsMDg
'0d^'a
ExrD!@ ]o tt tu{t t
EEG
rmrirn-tnl
n l[strrs,igryElgtr Ptx &lm T{
ADDENDA
al Gou.ily SoltdWlste' .Disposal Cbmplex
.. PfutsE lt ct-Ass I LeilDFtLL. EpAilSnil
ntr
REL
' cottsrnucTtoll DRAUnNGSsobru'|' n RD
DEWATERING PLAN
LANDFIII GAs COLTECTION - PHASE I
sARAsorA couNw CENTRAL couNTY soUD wAsrE DrsposAl cotrlprEx
| 220903t.0O
GENERAT
Construction of the landfill gas collection project at the Sarasota County Central County SolidWaste Disposal Complex includes the construction of four gas collection condensate sumps thatwill require temporary dewatering during construction. All four sumps are located within thelimits of County-owned property at the Solid Waste Disposal Complex. If it becomes necessaryto dewater the pipeline trench during construction outside the limits of Phase I, the dewateringwill be pumped to the nearest cleanout, CO 13, 14, or 15.
DEWATERING 'NETHOD
A two-inch or three-inch diameter discharge trash pump will be used to dewater each sump. Thepump discharge will be approximately 150 to 200 gallons per minute. One sump will bedewatered at a time and it is anticipated that each sump will require dewatering forapproximately two days.
DEWATERING DISCHARGE
Sump 2 is located within the limits of buried waste. This sump is shown on Sheet 00C 03attached. Liquid pumped during construction dewatering from this sump will be pumped to anearby leachate cleanout riser pipe, LCO-3S, shown on Sheet 00C-03which will allow the liquidto drain back into the landfill leachate collection systern. Three sumps, Sumps 3,4, and 5, arelocated outside the limits of buried waste. These sumps are shown on Sheet 00C 04. Liquidpumped during construction dewatering from these three sumps will be pumped to the existingleachate storage tank through existing leachate force main cleanouts. Dewateririg from Sump 3would be pumped to cleanout CO 13, dewatering from Sump 4 would be pumped to cleanout CO14, and' dewatering from Sump 5 would be pumped to cleanout CO 15. Cleanouts CO-13 andCO-14 are shown on Sheet C-29. Cleanouts CO-15 is shown on Sheet C-30. A detail of thecleanouts is provided on Sheet C-32. As shown on the detail, the cleanouts are furnished with acamlock coupler to facilitate discharge into the existing forcemain.
Sarasota County will shut down the leachate pumping system during construction to facilitate theuse of the forcemain for dewatering. SCS will coordinate with the County to make sure that theleachate collection pumps are manually turned off during disposal into ttre leachate forcemain.
Liquid from dewatering will not be discharged to groundwater or surface water, and it will not be
- \ttur i,r.tFa\,n r: td t^AA^ -'41ii*/ta,-
.?^. t0 - -o 'o#/Pr"uarqu,, " Znrn-.4.t'r - rtt
-Nr.- UtO\.ttp,'9 t h-, 4 . rrlt7
eiFrlr,.1.. I j:::. ! rf :..;jrgq j i;f lak
i:lt.',;:
s3tS37'i-i'i'rl ii jr .,::
ITt
rfH4 i-Y,**-.{
I, rlf$
fa ii.F
discharged onto the ground surface.
Dewotering PlonLondfill Gos Collection - Phose I
CONTINGENCY OPERATION
If the primary dewatering pump should fail, a backup pump may be used to dewater the sump. Ifa backup pump is not readily available or if the leachate storage tank is full, dewatering may betemporarily halted. Stopping dewatering will not result in discharge to ground or surface water.
DRAWINGS
Attached are Sheets 00C-03,00C-04, C-29,C-30, andC32.
O-
(f-\
/t/
t\-------'--/,
'--1*_=-_/---,t
./-t--'/\-----{
I
====-E-=Ur-j:--P_- -
ISS:UED FOR CONSIRUCIION
ISSUED FOR SID
KOENIG. P.E.
A BARKER EI.
FOR
r o1626
? _;-:=:ir'A_ __ ><:-='---'-
-=.:li -SEE NOTE I I
\'liisEE M}IE 9--cfYP.) \
2+)(lE'o HDPESDR 17 ECCENIRTC
rlilit
I iiti
NOTES
SCIIE l'=5'
PHASE IGAS SYSTEU PIPII{G I.A'
?o, *
ffi:#;
td
ii"o'ii' - - -:rl, rhl
lrl I /,tl
ifr $'--7flll'l riti
tl .b,rlltarl\ |,- o-f
l..TOPOGRTPIIY WDITN P}IAES I IXROT'GH M IYAS@ilPITED FT KUCERA INIER,{ANOML I'ic. OFwlroucltBr, oHo unNG pHOtOGRAililETRtC UEllloosFFOX AERIAL PHSIOGRAPHS OATED APR{. !A 2008.
2. PROPISu) PHAS€ I FIIIA GRTOES OESIGNED Ar XORENGINEERINq ING TAIIPA FLORDI'
3, CONITUCTOR TO PNOVDE A PE€-CONSTRUCNOXS1}RVEY, PilOR TO COXTB{CI}IG CONSIRUCIDNACIMNB, TO \]GRIFY OOSITNG CONDINON;.
.+. LocAltor{ ANo DENSITY OF LFG EXIR^CnOil SyStAr, ANE APPRO)OIIIIE ^t.IO
SUB'ECT TO C'IANGE BASED OIIE{SnNC CONDmoNS.
5. IHE LA}IDFI.! GAS CII-IECDON SYSTEI' $iArr 8€cONsfilJgfED lt{ 2 SEOUENCES SEANiB\EE I S|{^U_BE CO}ISIRTJCTA UPO}I D€P APPROVA OF PERUITAPPIJCAIP}I SEOUArcE 2 B NOT PrRT OF IH6coNsnucnoN.
a appRoxr|AlE t-ocAToil oF pr{AsE t rEtc}tAtEFORCE}XN OSTANED FROT RE@RD DNAUNCS F'CiraP DRBSER ,& tlcl€E lNC. D tED ApRtL i998.VERIF' LOCAMN IN FEIjL
7. HEAD€N P1PE S}UII B€ HDPE S-ON '7
Ar{D UTIERALPIPES $IAII 8E HOPE SDR I'.
& EUND FrAilcE Ar S|H EI\ES oF H€ADER gtAU- BELOCAIED 20 FIET'OUISIDE OF P}IASE 2 GOIISTRUCIIONGRAOING PLAN. ASTIIAL |oCEION TO E DEIENUI}IEDAFITR pR€-c!r{5tRcn0N s1,ilEy. s€E oEnn_3/O-O5.
9. AlI IE:MIIAIE ClEAMlt'l @NNECIIOI€ S|{^tr }IA\€ AREXOTE WEIlllEAD. NOr $€wt{ FoR cuRnr.
10. AR AIID FORCEUAIN EIdN OFFSET FOR CI.ARIIY.,II.
CONO€IISATE FORCEI'AN SI{AL @NNECI TO L@-lNAS SHONI{ IN DEIAIL tAO6.
12. |F IHE SASE 8tD AtS ALIER|{ lE AO ARE turAROgD,nrE coMRAcIoR s|{^[ COt${Egr ilE tE- HEADER, 2-AIiUII€ A{D f COTOB|SA]E REIUfu{ UNE $.io${ OID€ ALTERIUIE 8IO TO 'IHE RESPECITI/E VALr€ Pr rcRTr€ EASE gO
'3. IF l}IE AL]ERM'IE 8ID OP'IO'I IS SEI.ECTED, THEcorf]! groi st{Atl NsraL ajND FUNCES FOi rHEHEADER, AISTJI{E AT{D FPiCANAN VAVE PII SOUTH OF]}€ KT{@KCIJT FOT.
Ui\'.f,t\ t,\,
r z"-\\-/
z1 -
,--__i.\
o l' 2'-Er--d&stlffirum
E(lsNNG 6'LEACr|^TTFORCETTATT
I FORCgVAL\E Ptr
HEADER OUISDE OFwAsrE nENCH cfrP)
ROADCROSSNG
,'@)
Gentral County Solid WasteDisposal ComplexPhase 1 -Sequencel
Landfill Gas Gollection and Contsol SystemISSUED FOR CONSTRUCTION
SARASOTA CoUNTY FLOR;qA
,&r,
i,coiloansA?EsuuP (TYP)
I,
I
\*I
I
-:D:-:-:\r^\
-/
rrlrt30oz
zo 12't WPPIPE SI.EEI'E
(r.P) 36',coNoENsArE suxP tJ
_(r_q
6
FiR
\ "eNOIES:
1. TOPOGRAPHY TITI}IIN PT{ASE5 I IHROUG}I M IIISCOUPII.ID BY KUCEM INIER}UIIOI{AL INc. OFWIICUGil8l. OHIO USTIG PHOIOGRAIITIEIRICMEI}ODS FNOTT AEf[At PBOTOCRAPHS DAIEOAPR|L 12. 2008.
2. IRE}{CH DEPIHS ARE G1'RRB{ILY DESIGNO TO
BE NO SHALSIYER lMN 4 FEET AND NO
OEEPER THA{ E FEET FOR AT PIPFTG. SfTSI,.P DETAL FOR TOTIL SUUP DEPIH.
J. ONLY PRORI,E OF HEIDENUNE E; S}IOWN FOR
cuBrt HowarE& A!{ ARIINE At{D ACONDENSAIE FONC€}TAN SI{ALL BE IISIATDIN IHE SArtE TRETICIL
+. GIS UNE MANTERS S:Ti^l'I BE NSTAI€D EVERT
JOO FEET NONNC LOCANOI OF HEIDERUNE
s, AFFRoXIMAIE LoCAlrOil OF *lrsg I urcxlrtFORCEilAI.I OATAINED TROT RECORD Of,AWNGSBt Cr$P ORESS€F & llclcE lNC. D^IE) APRILt99& !'ER|FY LOCAION [{ F|€LO.
6. CII'TRACIOR RESFOISIBTE FOR CONNECNNGHAoER PIPE lo |.^l'lDFltL €ls coxnoL uNncot{tRAcroR REsPor6lilE FOR COilDAnS IEDMTNTGE €LEgIRtrrL ootNECIloNS Al'lD PAI' .
coNsIRt clKN.
SISNNG POIIER
Pou cnrP)
,rt\\ j Iltl
'\ \L
"l,* ", ilrl. I coNstRuclloN ,rlr\ \" \
1t III \
I I / I llIt r, \.l\\i \ tl\ / ;li\,tr..'LI|r-l il\--- it, '--. ll\\ --"-ij'i'
i "
\ ,ll.'t- '- Y\--'rl
r 't-l:-*----'- I --\
,tlll I'Ir i r ti
lt r I il1 I \ , llI i | | t'
ll+{Xt l2+t[
t/r\,\- ,/- \\| -' )
ll
,t\- t-
Itl \Tlll'tlhl'llltltlli
'tlliTlrl
'llI
itdilrl
iir\itiril
ROAD CROSSING(m)
/-.--.-,/ |
''fe._
t\
r8+51.59Jo.
I
t-'\t
D(SIIilG A? HDP€ 1
SDR 11
t8+6 !7+{X'
lRCP
III
I
NorE ArRllNE/FoRcEMrN uNEs NoJ sHoYrN FoR cLARtrY.
ry.ero
-10
.*"#G
=fuffiG
llllAPPROXMAIE LOCA'IIONoF.E(Sm{c 5',LEA61IA'TE FORC€YAIN -
I-El80w
{4_
\ r.otl\l\l
----=42'r RCPPIPE SLEEI./E
II
3O'' HDPE SDR T7U'{Dfnl- GAs PIPINGOUTSIDE OF TV5IE
Central County Solid WasteDisposal GomplexPhase I -Sequence 1
Landfill Gas Collection and Control SystemISSUED FOR CONSTRUCTION
HEADERTO FLARE STANONPLAN & PROFILE
iloN
SARASOT^ COUNIY
lu'#' isiF€Il,ldzrtDsr9 ilsE$On rE tJD
t.I
III
III
i a Li'rdi -'- "'
"e
aw 0uM6.tlso d DfocRAFiltcarriE El car co6hFBr MD{E m ts /so d ?09., lf,/atstEF*S, m ptIP Stllpl 4llllo gNEo{Yt6.
sREn! t?O$a rlffi ss E z-'at si @rBEto t(tEsB cs3{tsmffinollrB m dF Jt61r5- rtr.. rG tqt E Ga@r'.r*r*E]EEE'm-lErffim8r['drdnlwffi
- dt||m-.thI!leEtl||-
f'+Yr+ Tn{ Esrr c61.Un
El-too." EE\AIP!. Trud----sec[mlorrru.E.fi ----- u{rs c ractio u513------fiA*E ffi s srsm
rclEs'
L;w@PrI'8fl4EDSIE|&
l'i
s f{!,'4 UAr qJzI s., g.t:?a
!94
:agr:S
('rff, ---- HtE tsl!
---.--- an-l'4(.t'E
S tfiru
__ cEfiEt u'f, s mD
-'-aTrarE" "' r' !'-r|rlE !F oOClFElDll+ECDW
ma@ Ersg'! lElcll$EMET'I
. r lEalFlCrl
. CIEA$rrt
Gognty Solid Ylaste.
. CONSTRT'CTIOII DRAWINGSt'ir$n c{tJttx nlB
b,"u4,''br*,
N
otr|REtr OBtn0f ruyffi
taoJl
It'
IrI
t*rt{h;rr oG|tr B!A!i.{ alrnrt-E!4-E!6O DD,E{ €otl'cn
-.:*-EiDt|L!6qlot rnott
-*--l!tSormotqE lrE|
------ffilcu.lsor----acrOie
crillt lff IDEE
___---6{EFr€ r ra5
--stFOtt..,...1'. -..5 0/ EXstElB
-- EFD6O lar*{
€?iotiliDr rxst r ladrElrorn- .- -- *!u!lD lE @tl' flu,EmFa^
. ,.,.._.
- -a _
g€--
I
|,tEdr'tr*q,ur.$r
!fixr PqI
'MF,O
!r[E!,t. dtllrt e{b orl!Fc'u'r'' ctr'FlEfid 6r6il,E8l urc UtEFr
!r5 ,to ir r*, It9rltE FpIrp rut s7sn0{ talliG6a 0s@ s,aall .
a m ttarra us!E${4 E tfas E UCOI!jSqB €'I'EExE da |ft lll tE Pq
'l(t s r
I'A' EE' ITFEE 'lNT
E 6ED'rriD (lm,Ea ?fi|. - Ircagffitf. qr$w l|,.atl5 ff-t60E uhtt d €ila
.:GoudySolldWasb
DbposdlComplexPrtAtF I cttss trj$DFttr. EXFASF]ON"CO{STil| TFN DRAUNTGS' qlgrru9lpNg
gn|cta €nrr
FORSEiINH PI.AIT
o, f t.:.
sp
. FORCEMNN LO9dSION ON SHgUtDER/i
't- ffi||wdEAI.DEtxllrwEFxsastrrmDvtxl,|H aEu tt 9lf,rft|.E lBrOt086nil qftl|DltrL oFtLlte
,- 6E DgrL a tE's|gr m pm lioMnrroor Fnq
TIF'FuPE !|xflqY EEFffiFn6rdl€
PIPE.UNE CI.EAI.IOT.|T 1ft---"---:-r
IEIELr.. rte,cfaE N FE iFntt^rsr l*r * nh' 6DUllCLIMIBrrySreszr-tl{-z EEIG, lmtire lo rnur rrgctt uuart
crrst l,s'tnEllt cr,tsr. slxmED6m ax*goc APgsa' Tts loE&rL 9t!DE t9Enrg{lDl-lr!- gEffit. t|tB t,tlr ror E E lfrrED l| n{ r@Eil fr
m q€ rrJ |E.ot tlDor Brnrr g sPaqd'xlrt ucnt gBtD E Ft@ il d a rE ,eilcrF c,llE }7E.
A IxII FOPa m-- t?E 6 + ld- mfioEr + la':
a .l,ul SEsrsllI'E crsgt ss r a u/ul.t- l|GmrudcffilEDt5[E ItEffiFl{t
7. meclD'| llff E x;rluD ffi rMl. Btuff .,tandE crDill€ nffi hfldraRC{ntlC GFG* 6 DoSDIG PtE 6.
ts F EErpa to.@)
ucrtl.l.(cmx.'lffillll) (stl LolE 3)
'ttm cm rE 6R E qFl Dlru gccl!
srilrs !il n rE;t
5 A|c Slw
F
. ,II Flc 'IP€B
flrc I*l. ENNnlFtID o5 t56 (M la!lof,uBlc ?0 ffxa cs. -F?€ 'TO HNT'S iUII E TITE FFIEJSS rr{f-, tsil rt!4l r€n|rccau|4Em -@rnaans f sTlrono t[-t-rz(rFiat}rlcP?eJgm+|l
ffiF DIO
-6ad$'mn.o
@nn'|c
tt' orss t m-Er. 0t tors
Xf,EOYEffi
ATOMAIrc AIR
#LELSE vALlrE, €\
|ErsrEsCl)*ltmr m ia;rq raryt rrDl- rcasffislfEE0EtgG)arcsi'oqeEMm- IffiDAUpIDIoIsHilm(i) z rcr um rarr ass t!€ Pa-,sfrawroffi9ru E Em lGar.(i)zrnlrnsffisrPur.* lrc@gno'no< c rorOns'erstrsrcs@iH ** e.urir.re wnrr*o
rElES
t. fc fEatl'r rE |l,roruF BtrlE eo"E|s€ nE 9lDr 6 alcrtlFCESG.
a comRrg* $r|! r|6ru ruDutE rnErqrE \nL!E o.nEl rt ru. rElPC{Ed
'lrR cdll8€m9u FruNE PmtOS! tOCaEEf fli6 hil bEt@, Nt rD
co6tnlDolr
ooBcro ID clr
c(rFn cl|o|L od^tq
txrDuD lo Ar !o,!t ttmakD-trur
E KflrLa ]tn,*I|rBSd PA ISm T{.
ADDENDA
Coqnty Soltd Whste.Dtsposal Complex
-
PlrArsE I ct-Ass t |_ANDFIL. Et@At{stoN
rm
FORCf,IIAS{ DETAILS
"::t=-{' CONSIRUGTIOilDNAUNNGSsgfirafr
-.ttl.1 A.A '<-rt:.-tL
f -A'a 'r4t'tT,/'t* \/Y \. ,9i4Fr.uohh,.- 'B .'-'nYio"
T"ft"" <oit '''?,u
a .ry/^_,/
DEWATERING PIAN
TANDFILT GAs COTTECTION - P}IASE I
SARASOTA COUNTY CENTRAT COUNTY SOLID WASTE DISPOSAI COMPTEX
r220903r.0o
GENERAT
Construction of the landfill gas collection project at the Sarasota County Central County SolidWaste Disposal Complex includes the construction of four gas collection condensate sumps thatwill require temporary dewatering during construction. All four sumps are located within thelimits of County-owned property at the Solid Waste Disposal Complex. If it becomes necessaryto dewater the pipeline trench during construction outside the limits of Phase I, the dewateringwill be pumped to the near€st cleanout, CO 13, 14, or 15.
DEWATERING METHOD
A two-inch or three-inch diameter discharge trash pump will be used to dewater each sump. Thepump discharge will be approximately 150 to 200 gallons per minute- One sump will bedewatered at a time and it is anticipated that each sump will require dewatering forapproximately two days.
DEWATERING DISCHARGE
Sump 2 is located within the limits of buried waste. This sump is shown on Sheet 00C 03attached. Liquid pumped during construction dewatering from this sump will be pumped to anearby leachate cleanout riser pipe, LCO-3S, shown on Sheet 00C-03which will allow the liquidto drain back into the landfill leachate collection system. Three sumps, Sumps 3, 4, and 5, arelocated outside the limits of buried waste. These sumps are shown on Sheet 00C 04. Liquidpumped during construction dewatering from these three sumps will be pumped to the existingleachate storage tank through existing leachate force main cleanouts. Dewateririg from Sump 3would be pumped to cleanout CO 13, dewatering from Sump 4 would be pumped to cleanout CO14, and. dewatering from Sump 5 would be pumped to cleanout CO 15. Cleanouts CO-13 andCO-14 are shown on Sheet C-29. Cleanouts CO-15 is shown on Sheet C-30. A detail of thecleanouts is provided on Sheet C-32. As shown on the detail, the cleanouts are fumished with aCamlock coupler to facilitate discharge into the existing forcemain.
Sarasota County will shut down the leachate pumping system during construction to facilitate theuse of the forcemain for dewatering. SCS will coordinate with the County to make sure that theleachate collection pumps are manually turned off during disposal into the leachate forcemain.
Liquid from dewatering will not be discharged to groundwater or surface water, and it will not bedischarged onto the ground surface.
,'t'_--..,,.i' _-1, _., "'1
: -.-- '' ,is a$3) .,,j
.: Jrr .? ,;,i.:: f.ti
'ir, , , vV bl ''
'tyu)x.un,'\4Ul:'-UA-a -
- "',zt;ttX 4p>"Al- 't4t'!/Ar,.- 'cB - o-
o?Wpr
"u(/hru,- u 20n 'tl2tV
_ r-t.r ,ul't:l h'
'(UD..O f'^,,4 ,rylCf
,r --.
Dewotering Plon l'Londfill Gos Collection - phose I
CONTINGENCY OPERATION
If the primary dewatering pump should fail, a backup pump may be used to dewater the sump. Ifa backup pump is not readily available or if the leachate storage tank is full, dewatering may betemporarily halted. Stopping dewatering will not result in discharge to ground or surface water.
DRAWINGS
Attached are Sheets 00C-03,00C-04, C-29,C-30, andC32.
HADER ACCESSPOrNr (rYP)
NOTE o
(CONDENS{]E
.;suuP (TYP)
P.E.
A BARKER. E.I.
ISSUED FOR CONSTRUCI}ON
SSUEO FOR AD
lor626
UMITS OFCONSTRUCTION / --j-
-- -:?= - ='-- -;.- -- '-{;===$==gqi.rt -
:'--1'
1. .TOPOGR^flTT BIITIII{ P}IAES I]XROT'GH M WAS@'TPfl.ED B' XUCNA NTERNANONAL INC" OFwl.Louotgr, oHo rrsNc pHotocn^ltuElR|c I|EIHONFROTI AERI^L PHOTOGNAPHS O{IED APRIL IA 2008.
2. PROPOSED PHASE I FII,|^! GMOES OESIONED T HOREI{G'NEERING, INC TATPA FLORIOI.
5. CONIR^CTOR TO PROVIDE A PRE-CONSIRUCTIONSilRvEr, PRoR l0 CO|,I|EI\CIi|C CONSIRUCIbNAfiMNES, TO VERIFY O(SNNG CONDIIIONS.
,r. LocAtor{ AND otr{sTy 0F LFc D(IRICnON Sr$En, ARE APPROXII'ATE ^NO
ST'g'ECT IO C'T^N€E BISD OIID.I TNG CONDIITONS.
s. IHE tAllDFr,t c,As clu_EcnoN sr$Er 9rA|'|. 8ECoNSIFiTCIED lN 2 SEQUE},ICES. SEqJE\6E I SHAIBE CONSIRJC'ED UPOII D€P APPNOVA OF PERMfiAFPIICATOI{. SE(IJATCE 2 tli NOr p^f,t 0F IHEcoNsnuclbN.
A APPROXUAIE LOCATb'I OF P'IASE I UTd{A'IEFMCSTAN OSIAINED FROT' Rg@ND ORAWII.SS EClllP DRESSER & tlcX€E lNC. OATED APRtt- 1998.VERIFY LOCA1ION IN FEIII.
7. HEAD€R P'PE s]{TU. E I$PE SDf, 17 AI{D UTIERALPIPES 9]AII 9E HDP€ SOR It.
E SUND FI.ANC€ AT SOIH EI\DS oF H€AD€R S}BLL BELOCAIED 20 FEE 'Ot ISID€ OF pt{ SE 2 COf{SrR{JCnOflcRAon*c pu|t ActuAt_ toc IoN To BE oEEnuilEDAFIIR PRE-CIN5IRI,'CNo}I g,RVET. SEE OETAL3/D-o5.
9. AI |"EAS.|AIE Cl fld.tf @M,lECnOlS Sil{ALl- }tAvE ARE{OIE V'EITfiEAD. NO' SHOilT{ FOR CURTY.
IO. AR AIiID FONCEUAII{ E$Til OFFSET FOR CT.ARITY.
1r. @r{D€}tsATE FORCEII $t s]r u coNNEdr To r@-lt{AS SHOTyN tN DEIAL t4-O6.
12, T lHE EISE BID A.IO AITENMiE BD AR€ AilARDITLIl€ @NIRACTOR SMtt coNt{Ecr rHE 16. HaDER, 2.AiUIIE A{D f COXDENSA'IE F€IURN UNE SI{OWT{ INTT€ ALTERMIE BD TO IHE RESPECTI!€ \'ALT'E PIT FORTl€ SasE eo
REDIJCER
'-)I
\/ll\,
z1 -
,--__i.\\).
--tE(SnilG 6"tfAcHAIEFORCEMIII
\I
Central County Solid WasteDisposal GomplexPhase I -Sequence 1
Landfill Gas Collection and ConbolsysbmISSUED FOR CONSTRUCTION
t5. IF IHE ALTERM'E ED OPIPI{ tS SELECTED. lHECONIMEIffi SMII NSTAI BTIND FI.A}IGES FOR IHEHFADER, A&JNE TilD FORCETAN VAL\'€ PfT SOUIH OF'II€ KNOCKqJT FOI.
s0r-E r'=5'FORCE U ttlVAL\€ P|l-RoAD /-a
cRossNG 4l'(m) Lgg.J
pHAsE I Bo/,.. 'e rGAs SYsrEil PtPll{c LAYour "3?n^
,n;g4i
0r't-EFE-If &s*|srumEMglqiSAMSOIA COTJNTY FLORDA
I
\'s
I
Ij/
r--/ /
,"--,t
PLAN VIEWSCIIE t'=r00'
PRORLE VIEWSCrq,LE r'-101, 1-=l0o'H
I
ii
rnr14
>306z
20
IiR
Di\,
t\I
(-T
Irl '' "'ril
ltl'tlltl1l
lll
lli
til
,llltll! - -
ill ,"',' t,
i\r,z I
ilr-il ,rr-
\,
I
(
(
\
SOSNNG POIVER
PotE orP)/>--t/ |
\_-
- Ga_ _.
tttr--
ffigg."*nAI
_ _tz-
=;il**, A_:coNrRoL uHr L!41
ll' \./aROD CRoSS|NG/ 1 \(rYP) fE-l
-CNOIES:
1. ToPoGRIPHT W|]H|N P|{ASES r l}lRoucfi M rf^sCOMBI'ED A' ruc€RA IN'ERilATOI{AL INC. OFWIITOJGilAV, 0}IIO US$F PHOIOGMTfi{ETRICMB}ODS FRqI AERIAL PHOTOGRAP}F DA1EO
APfitL 12, 2m8.
ZTRENCH DEP'}ts AAE B'RRENILY D6G$E) IOBE rc SBIICilYER IllAN + FEET AI{D NODEEPER TiAT E FEET R'R
^tI. NPNC. STE
SU}'P DEIAIL FOR TOTAL SUUP O€FTH.
J. ONLY PflORI.f, OF HE{'ERIJI{E E; S}O${ FORCl.rffIY. HOTJA'ER, A'{ AFI.IITE AM) ACONDEI{SAIE ruRCEI'AIN STIAIT ffi INSIAII.EDrN IHE S^nE nENClt
4. GAS TJNE MANKERS SfiAr! 8E INSIAIIID EVF'JOO FEET NONNG LOCAIIOOI OF HEAOEruNA
5. AFFRO(IMAIE LOGATTCN OF P}IISE I TEACHATE
FORCEUAII O TANE) TROlr RECORD OMUI'.IGSBf CruP DR€SSEn & UCXEE lNC. DAIED APRil-t996. \'ER|FY LOCtrXtt{ ril FlEtD.
6. @'{TMCIOR RESPoI84E FOR CONr€gnilGHEAOER P|PE TO IA{DFII! CAS COI{IROL UNT.cot{lRAcloR REsFof,rsBt.E FoR corDa|s lEDR^$\UGE A€CIRCTL cOiI{EgIloNS Al0 PAII .coNsIFugItol|.
l8+5t.59
70
o
-to
M'|E AIRUI'|E/FoRCEMT UNES NOT SHo\|N FOR CtARrTy.
!.|a't RcP
I
J6.' HDPE SDR
ffi"*"ff*I{AIffi I w
Central County Solid WasteDisposal GomplexPhase I -Sequence I
Landfill Gas Gollection and Gontrol SystemISSUED FOR CONSTRUCTION
Sr'RA5OH CoUMIY FLOnDA
FORC€T'AN
\ r.oEl\lL.r'l *""
PIPE SLTEVE
II
50'r HoPE SDR t7UNOF|I! GAS PIPIIIGOUTSIDE OF IYI5IE
HEADER TO FLARE STATIO}IPLAI{ & PROFILE
o. 1' TFEFE-If UGSl{wWFEF6*Mt
ti'l
tiil:til::.l'i :
iiitI
riiluffi. HflDg$CE B'lffi
F?B.IIE IXF(&Itc ItrE lE bt 6sm EaEstn[s
,'._l
./--\t
-I
\
----__!
= -: ==; : = :'-='=:F:---tf '] -'-'-'--" I I_-.- t--f-'*\i'r ,l. I ,.,r"\ i
i 'ii,, i I
x{f""et.i
I riil.rii
,I
ltNI
5uff
ri'i '45 1ir lgr ' ' - '
xgEs,
L;mtmfficoiftE g FI8r|eil4 F6u9l€roos tpa rayr.rt.j44,.17. Nr.
aqrtxrFr -ooffi
-gs d EFocSrFwcarfi,o Et @u cosrlErEr ruilsD.gE|'nt tF,9a d?Erl'rcfiEffi N HJI? 5t[t0l F{IO SttDJE [Y 263.
s,F-Ern!Pto||rau*aF ruE7t'otrGi totFoittD tclE rB cfl$flETEFINC ltr O,il r3s E Ed N !Eat E' t{&G sHl E C@r'mruE|IE'm-ryEMIil. CWTAEIEcntf Im- ([r-i9ll C ElxL
F---Ht|clnson rr|< oiq
-----ffi DroFidD
s u tra. b f*.#rwrdstffd.tqnEGI-abnso;arvtr cordnEq
mnl$fRr.EAi ------ uds G ?mFGtD lratBA ------ mnuE urE c srlrtr
Ftil=lI'
g
,.., -_..._.E E qr FOGT&'E|!|{
+mm
+noP@ tttsE r tElcS4tErE*a/|{
. CIEAYI,I
S lsrru
ADDENDA
WGenhal Golrnty Solid YVaste.Disposa!.Complex
PHASE I CTASS I LANDnrl"EGN|Sto|I
GONSTRUCTIOil DRAWNGS
FoRCilArtrPr-Ail
ol't=
Or+
t
;
N
o?POXgctttWrsmt0f m
.!tE!r, caaq.tt g$D o|| 1!90dtr qna]llt8rd dcrrEloa f,)G utE rfil!e! !6 tt rBE ur9ltt t!&s
do art g$re{ lRdtE st orErED utt,aa* .
:. twwr&trsr4l.ttaN ntEE& lanE t toaFltlErE>da rfr{ !.al u6 xn nE' 5 ,tsfrrG w Dnlat6tDairo umID ?oEl - Eo4FE4ltf.4t0alu| haffiqgt-r4a, *i'zt d it(&
t*!=5:==={
t
I
I
I
IIiI
II
a,
iEloslg tunaanrxcLtrrout gcNffmp, tm
t- tEa{lwlEslIDffitffifril sfrEAlffi lorl.{lrr8 aFu[Eq,rF]a€ nnl}|olt@!ilrx- rE Dral sLLflc
z sEruam.9{ntqmtFunx llgcr Fnq
FI,l€ ICF'CEUPE N*Y EIE'1IPFffiFNEMq .FffEEi 'ffi)
ril& 6Efi.t (cdlar.'rprctl -Brafll) Grl rolt .J
lf fB ccta E qutE qEl DrR scrt!.r
*ilonofl
tr cllcr( cdnrn1'/wn|Dosl
':!d"'
t.. IEFIIGNEE 'ErullTtr
ru BE ffisD !P:l2L l,[ll!. PaDCr€ sEg - tlf
z Eorr, mrrirc ro rnr DxtcM tantcuss a a
'tn |sDa Erart EIlrflE salo r
m 4t@Gn,ltot€r' lE lurEAsil!DC[tlnr€mr-R SEESEm
1 t{tn ${r tqr g ?iFarED tr ![ rroqr amq€ fF.r E tr @an rno( s sPEEr
4.'rfBmS*rtDGnEf,f t,!El ,
&rcrcF.lrf9'E. -
;8lE{m--PE@+ rd- NIFEt I t8:
r iul- sE! sill E qJEg I oai ! a cuul.n- fllr@|t 9uEEnf.tEDar5E S'EffiFB.
?. tteeDl u4, E t69uE Em tf Eqnil. HfiUn gidE clanrilcE DtrF! lbed|.nD|nr]o GiGaa r DEluo-g?Exi
Of PT'EID''
s(il*!nnre*
m
a'8.il4
s4E stiB
wv€ b(waI'
. Ar h,C ,|?t rr|o flmEi flr. EPESgJig RAIE C6 r5O (f 18)dtr|610&tAm, F?cno Fnrc s|t! E laDE tn)|E sS t3aaa-E osfl rt84} TcMruEE@naoa{flt r sl|ro$o itG-ts'2$FeAt FyC PErffitrlB
t5 FE O..EO|V.
F
.E@R EmiO
-t{'6'J12t1tr
ruED tlTlm
]*r*f *slglrt.orsslm'
nGNnIHo.qt|ltB€ OOSIIID .ID g
qrEDdrF,E t.a'ttt
mrlm- tilUl
I yrs{- ls FB EtuESnr PE tsrm t{
sELEml.s D![ 0rut3 ff
ATJIOI{ATrc AIR
#LEqsE vAL\tE /S\
nl-lqEsCilmu naagutrr ln)lg EESBgES'EEOITB
G)resircrom_ {ffiDADDSM4H3(j) z r.qr um r*vr Bs Pt Fa*m4ffiffiffi
tru E lnFat€tr(ilelnrrnrssmffru_ lFE
@mno'mcsoe@n*s'ureswsBEa$drO i nnr nrs s{! \aJE wil r*I- uttn
lrct€l taa.
m ctotj'
ADDENDA
derr. fq ttlcEn t6E artolttF sqll|a ralAst n$E fft if(Hrl
a col||Elctoi 9{! r[54] ruwtr! aEgrgultE (^mElf a! BP(ttEi oi
'!rom. c0t{tiElfiru coffinlEP*'6EDr4Xffiorffi n|l| a|lt@, Fs tDcoslilR
Cou;rtr7 Solld Whsfe.Dtsposal Cbmplex
PTIASE II CTASS I TANDRLT. EXPAilItnil
I ceFGD E( Oi 3€lffi coFosln{$*.m
FONCEMAff DETilTS
oErt=-{ @Ioo"ff| tr]Mgts('nru|lt CO}ISIRT'CTION DRAUNNGS
DEWATERING PLAN
[ANDFrr[ GAs COTTECnON - P]|A5E I
SARASOTA COUNW CENTRAT COUNTY SOLID WASTE DI5POSAI COMPTEX
t220903r.0o
GENERAT
Construction of the landfill gas collection project at the Sarasota County Central County SolidWaste Disposal Complex includes the construction of four gas coilection condensate sumps thatwill require temporary dewatering during construction. All four sumps are located within thelimits of County-owned property at the Solid Waste Disposal Complex. If it becomes necessaryto dewater the pipeline trench during construction outside the limits of Phase I, the dewateringwill be pumped to the nearcst cleanout, CO 13, 14, or 15.
DEWATERING f6ETHOD
A two-inch or three-inch diameter discharge trash pump will be used to dewater each sump. Thepump discharge will be approximately 150 to 200 gallons per minute. One sump will bedewatered at a time and it is anticipated that each sump will require dewatering forapproximately two days.
DEWATERING DISCHARGE
Sump 2 is located within the limits of buried waste. This sump is shown on Sheet 00C 03attached. Liquid pumped during construction dewatering from this sump will be pumped to anearby leachate cleanout riser pipe, LCO-3S, shown on Sheet 00C-03which will allow the liquidto drain back into the landfill leachate collection system. Three sumps, Sumps 3,4, and 5, arelocated outside the limits of buried waste. These sumps are shown on Sheet 00C 04. Liquidpumped during construction dewatering from these three sumps will be pumped to the existingleachate storage tank through existing leachate force main cleanouts. Dewatering from Sump 3would be pumped to cleanout CO 13, dewatering from Sump 4 would be pumped to cleanout CO14, and dewatering from Sump 5 would be pumped to cleanout CO 15. Cleanouts CO-13 andCO-14 are shown on Sheet C-29. Cleanouts CO-15 is shown on Sheet C-30. A detail of thecleanouts is provided on Sheet C-32. As shown on the detail, the cleanouts are fumished with aCamlock coupler to facilitate discharge into the existing forcemain.
Sarasota County will shut down the leachate pumping system during construction to facilitate theuse of the forcemain for dewatering. SCS will coordinate with the County to make sure that theleachate collection pumps are manually turned off during disposal into the leachate forcemain.
Liquid from dewatering will not be dischargeddischarged onto the ground surface.
to groundwater or surface water, and it will not be
rftltl{ffln,-"ileWrf,fg*,.
fhn 'eI d#&u>
*,i,1 - s 2r;::iirfiil'fw^, -vilt
'aaPe%r,cri,'i:'i,,.!
"[L+J
Dewotering PlonLondfill Gos Collection - Phose I
CONTINGENCY OPERATION
ff the primary dewatering pump should fail, a backup pump may be used to dewater the sump. Ifa backup pump is not readily available or if the leachate storage tank is full, dewatering may betemporarily halted. Stopping dewatering will not result in discharge to ground or surface water.
DRAWINGS
Attached are Sheets 00C-03,00C-04, C-29, C-30, andC32.
o..rt.r\r\t
. \i,\r
1'\. '
(
f-\
I ACCESS
GYP)POINT
to
SEE NOIE 9
" // -----,, (
ISSUED FOR CONSTRUCNON
lssuEo FoR gro
I'::_:..lE++=*-*
UMITS OFCONSTRUCIION
.j.--:,i.'_-
<==-=:.s\"- 's\*ser r
i,fi'ct't ):,xj ,o,16'6 ELI
riillil itl:
i LP::!€
NO]ES
TOPOGRAPHY WI}II'{ PI{rsES I IHROUGH M IYAS@T'P|LEO AT XUCERA INIERI{ATIOI{A INc. OFl|fir0uc}|Br, OHIO USNG PHOTOGRAUUEIRIC UEIIOGFROf, AERIAI PHOTOGNAPHS DAIED APRL IA 2008.
PROPOSD PH^SE I FII{AI GRAOES OESIGNED AI HORErGrNEEirNO. rNC. rAlPA FLORTDA
.CINIRACTOR IO PN@DE A PR€-CONS?RUCNO'TS,RvEr, PRoR To Co|rtlENOttG CONSIRUCIEXffiMnEs. To \ERtFy oilsnt{c coNDmoNs.
LocAIOr{ ANO DENgTy 0F ttc O(IRACnON SrStBtARE AFPROX|UATE AtO SUB'ECT 10 CI{ANGE BASED OIID0snr,rc clNDmoNs
s. IHE IANDFI! CAS COtrTCnol{ SrSrEil SIIAL 8EcoNsIldJclED tN 2 SECIUENCES. SEOUB{CE I StArBE COI{SIRJCIED UPO}i OEP APPROI/A 6 PERMI'APPI.ICAIIo|L SEqUENCE 2 IS NOT PART OF TH6CONSIRIJSIION.
5. APPROXUAIE LOCATIOI{ OF PI{ASE I TEACHAIEFORCE}TAS{ O TANED FROII R€CORD DRAYINGi F'C.AIIP DRESSER & llcKEE ll{C- MIED APRIL t99AvERtFY IOCTITON rN FlE1.0.
7. HAO€R PIPE SI{AI.L gE HDPE SOR 17 AI{D UTTERALmEs ${A[ 8E HOPE SoR ri.
& gUNO fl,AilGE AT EOIII ENDS OF HEAD€R $Url- BELOCAIEI) 20 FEEt'OUrstDE OF pH S€ 2 COilSrRt gnoNGRAONG PLA}{ ASIIIAL I.OCAIION IO B€ DE ENUNEDAF'EI PRE-COIISIRiJCNON SJftVFT. SEE DEIAT3/D-{s.
f. i{t! t..Erc$ttE cLEAltot'I @NNEcnots sltAll HAVE AREliOfE WEIIJTEAD, NOr SHO|II{ FOR Cl-Ainr.
'0. AR AIID FORCEIIIN S{ONIN OFFSET FOR CI.ARIIY.
11. CO{DS\EATE FORcEil lN sH ll CoNNEgf lO L@-rr{AS SHOITN IN DETAIL IAO5.
12. F THE BASE 8ID A|tf,) AL1ERMIE ED ARE AilAROEO,IHE @rIIRtCKn SH lt cot{i€cr fiE lE. HFroER, 2.AIRI.IIIE AMt 4. @NDENSAIE REURN UNE st{oWII IXl}E AL'TXI{^IE E|D IO IHE RESPECIII,€ I'ALT'E PIf FOR1}€ EASE EIL
13. IF THE ALIERMTE 8ID OPNOD E SET.ECGD. flrECONIRFIOR SMII. IilSTAI AJND R.A}iGES FOi IHE}€ADER, ARUNE r}{! FPRCEMSI VAL\€ PT SOUN OF]l€ Kr{ocKcn r por.
HDPL:ccSttlR
I ta6
I.:-f--l \r\"N l-r' I
\
\ ---.'t--- \.
\ ,/,tl/ '.1
tl,! tl
t'lr ' ,'(TY")
Central County Solid WasteDisposal ComplexPhase 1 -Sequencel
Landfill Gas Gollection and ConbolsystemISSUED FOR CONSTRUCTION
_.<_:_:
HFIDER OUISIDE OFrv srE aENcH Cryp)
' D(SItllG 6't€ACrt^'EFORCETTAN
tROADCROSSNG
SAMSOTA COUNTY FLORIOA
SCIIE l'=5'
o.
cot|t)ErsAlEsr,rl|P 0YP)
il6.*o**nfi\ ;(rYP) @l i
)./
/^t/ /
l
l^feII
rrlt-r'lt50-loz
20
ID^\,
RCP
i\' -' - 3o'__li\-Ti- - - -3oi' -
-'- " -t-'\'-\ r- tl !|! \\\ i rl t rff' \ .'-A.ROAD CROSSTNG/ r \oYP) fffil
\ IL UMtls OI\ \ coNsTRUcTtoN
ll Itl Ilr \fll i
I iil ,B+r,.seI I I l, Itl l8+J1.59/ -li I i ir rii ro'u\ i \ rr lll 'i '.. \ ir lii t,
I
\. t. ,t lt. ltl. ._-t'iI \ ''-' il ;li ---------i___,i, .--- if lii !------:--<\--s=i!
t\ Il\ |
lj iilL gnf cnorr,^cft ',il rli Cm) fE-l rs+oo-ti 'tti' ltl s-tl rd
ll 1l r{, i
': l'l '\ i =fuffi'"Gr | .. I tl ll! r rI \. .. ,, tl lrl _-/ |
:l
, '--. ll 1! ---\ r\ -_ r ,- lt! D(SnNG E? HDp€ r\ \ ,ll\11 sDRllFoRcanAlrit\ t-rjlilrl .. r-\ tl\ \ lliu /\,// \ I I'r \-/\ -'.r ;hl ! -' r-. -";1\,/ , \l\ \-/\ -','rlll ' -' )-. -" ;1\-/ |
--------u'ilt--__ _\ r,! ,rr- ,u lr .//
70
60
50
-aaorI
RCPSIEEYE
II
I
20
10
55.' HDP€|.ANDFII! G
ouTso€ o
l|Hl
o
-10tit+oo 15+OO
MtlE aRUilE/FORCAr^lil UNES NoT SHolrN FOR Q,ARIIY.
PRoPosED "*n ftuNl( FE{CE I H6 |
SISIING POTEIFOrr CIYP)
z.----,t I------ r:-:-=
-CNOTES:
1. IOPOGRAPTIY VII]IIIN PHASES I TTIROUGfl M WlscouPrt.ED Bt ruc€R |NIERNAIOIW INc. 0Fut!(nJcHar. o||Kt usflG PilotocMrrElrdcMSI}O6
'NC}T AERAL PHOTOGRAP}F DAIED
APRL 12, m08.
2. IRENCH DEP'}ts ANE C1JRffENILY DESGil@ K)BE NO SHAIOTER l}uN + FEET AND NOOEEPER I}t^N E fEET FOR ALL PIPIT{G. S€EST,['P DETAL FOR TOTAL S1'UP DEPTH.
5. ONLY PRORT OF HEAOEruNE Fi S}IOUIN FOR
ANffTY. HOINEVE& AN ARI.JNE AI{O ACONDEISAIE FORC€XAIN S}UII * INSTAEOIN IHE SAT'E IRENC}L
{. E$ UNE I'ARTERS S}iAIL AE Ns'ATIED EVERY
JOO FEET NONNG LOCANON OF HADERUNE.
5. APPK}XIMAIE LOGATr)il OF PHTSE I l TctATEFORCETTAil OSTAINED
'ROT RECORD DRAW}.IGS
At CrxP DRESS€R & gcxEE, lNC. DAIE) APRII199& VEntFY LOC IOil N RE[O.
6. @MRACTON RESPON:TBII FOR CON!€CNNGHAOER PiPE M L^NDFIIL GAS GINIROL UNII.coNnrcIon REsPor€r8tE FoR CORDB{S lEDM$U6€ EI€CTRE L COf&.llCIrcNS A'.lD P It .
coNstRt cPoN.
''fs._
-$
Central Gounty Solid WasteDisposal GomplexPhase I -Sequene,a 1
Landfill Gas Gollection and Gontnol SystemISSUED FOR CONSTRUCTION
e] tl36'o
\ rrEl\l
-L.r'l ..,
nPT srE:vE
I3O'' HDPE SDR t7UNDNTT GCS PIPI{GOUTSIDE OF WEIE
HEADERTO FLARE STANOilPLAN & PROFILE
o1'2'FEF-f russ|tr*nsDE.6*@tSARASOTA COUNIY
"e
agffi ffi-8ED d EPOCRTSYcoq,ED tt@u coGtlrm ffiD{E T'RI
'9S AD d E IEE }!E
ffitpP|rg[nrugMUt6'$fi.M!
'OICru*Int ruc 72''oLrss as@tcl! ralErEn c.rFGltE
lsrxc lta oa3 tgs ffi w N Jt6/t5- rc,. rflffi
'I||l 8e ctDa.
r*r roE uSoE'outEr -LErillEmtvDt' dm Hr(E|rcGnotl !0m- qr-U! (h AXnL
44 q€rr,,.^
w^'l.
... .. ''. . '.: .;
["e.0 tiFFEIir
"10 |f ,.:) tg'rst! Fs.SxI S.' g- :aer 5r Ei r:S il
=lI|
g
fl b. f++:+ Effi Estbr corn|,El
il Ed
-
etri'.6o'aantrl codRE!CFm mf,lotRr.
t dl ----- ufs G pmposa) tr\El'tt!l------frAtrE uxE r Dffi
'UryT
- - -- nr.€€ LIlscffi lx( FrE
O lElR!
FiORCEUAII{ Pllil
' ... ' -... -.rUE f DOErtED.a_ t8orao m
lloFE ?ttsf'r tE c${rEErOI'I. r rstiltFa
. C|!Iv'ut
Gounty Solid llVaste.Disposal.Gomplex
PHASE II GIA]SS I I.A}IDFITI.EXPAltStOtl
mNsTRt cTtolt mAtry1116g o:-+-rr
N
oi ct*.t. ffiIt eA$D Cr llFlrtr|' c6t?r.ord ffir.Eroan3 utExitr
rlE s .Fr tBr, ItrqtE Frcorrsoruost|oa ssBst!E@sLA-
1'Wffiw5lts{llltTtaN NEIDIONEqE qIUE!r*Fd6 tp,r lua EE Fll tE s ,I'lttr E TEEE ru Ei !N'D'lriD uoq,Eo!@lr - ffiEffilf.4INtUl urrltD€ ff-rm. il-itt c.| 9q,
t*ttrdr: d67ilt B.tr lnif (Dnllt
=E:+-Fr!6t! A.Oa!t{6rtq,l
, --:*-!i.ul..d@lolffi-e--!rllr
qt raotro ttgr
------mhdruG€F----acrtic
cull loL IDGE
----- Eo'lIE*U€ dr t9Jro
!f tna?Gb t {5t a lDsEIETEITX
*!rBD lgrDtlfficE^
r.Eaqrlla.rfi{lt$t :rlIJ l$s I tFrl
rp-glL .l?;4.
Gour*y Solld Wa*eDbp6sdl Complu
PItAgF I CLaSS lrinDFlrEXFAilSloil"
.: rl&drrD{
. (l.ur6gr
? lJef 90.E
'il*; n iE{
CDIISTil|SNONDRAWINGS
FORCEflIATT{ PI.AH .u&u&u.z%
wrrE F(
r- mmwEtFALoffit|r@r*EfilsttffiDluDfrx rulurE tw)€E qFraxomn4l.@m|r&ru.ltc
L gmaB.ffirmlFMrrH Fnq
oF PI,EI9('
,ror'uf,t3!ilttrmtft
daeop
silm
EICE igFlmUPE TX.MY EE.|IPGffiNRgM€GEwffi im)
.'t4 AOErr. (Cmr- lElCllBAoau) (ltl
'tolt t)
''|mclmFaRtEq,Ea ilrugm
ltilIs"'. -
r-. rEroit E FE tcD|lfrDn 5l9& E Fffi,GlI E:l2L IEIB PrfreE 9Zt - tE-
r. @t4 ilrI|{rc ,ta tfra. Broelt ntd{q,Bs r $ ?ft EDa Easr, IrlxuxD ritloFoR tslIFGnF6A' Dq! lur*[SDSlIt En I$rD l-l3. SE SffIsm
l. trlln t,trlr lg G EtrrcD !r '1,|[ iloail 0PqEnqEfl18 ilsno(ssPat
{'xn^l' !Elq! qqrD E FtE t d,tatF&TCIF'F,I}CF}E.- .
6 m AA-X W-- PIE O + rd- Nng6t + ttr-
a fut ltEaEl.srt E q.sg I EN r c &ul.t ffl@ruE€mD.sE:ttErn!'
7. flnclurl tarl lE IFf,rltD 4tPtt D Eqpf. hr|uq rlEEcaaHcE D!b6 HEdtRDrFro GtGrp G Dr5u0.9Fo,Es,
k:I Al Frf, tfe ,rlD fmrEl srll 8€
FiES9TRE FrlE Cr4S r5O (f ll)00tsrr6 l0 fiilA ctoo. F?grp Rmc
'|u- ga nr rnr
EJss re{'|-g (rsr rr!+ T€mruEmtr&t|n60{r9 f sltorro ir}-F 2$!-aa.L }rc Prtsmlo
.F?c'rtE-
-tqtE Frmg ntnio
]*r*{*IFED shttrD tt' crsc t m'm cussrEAH oF txlut8€ oo&tttB ID Gr
o6rREmtt'ld|la
lELNilET6)elolnr rn natr* w nsl-ffisEvEfpgltB(5)resircmorm- affiDf DmsHum(Oz m Umt{}rlrs tt€ ?tt-mtffiffiffi9(lL E tnF ltEM,(i)e ran rnss qumrn m ru-ffi
@anomcsor@dsrew$wEls,Dtr6)I n ooss eutiJ€rrtx]x.D- lA4n
rEIES
r. m tllcg.rfi t6E anqrlE ualJlr& nalrs6 stt I'llr 8lgffitlssfita
a l!{tBg8 9Al! 06ru AtUrr|D rnEl.E sE brYE; (^mE) f ro lolmflrmm ct{lf,Ern9U CmilrE t*tGO LCXffiOf ANE lln| OEETN PF* IqcoEtfl.tttof,
qtDub:od (aqt
U*X El|- LUI
r rrsrl r rq truECnr PA ,.stflo T-IL
lm sPfcEslE 6 EEE|al'EIXT q
TOADDENDA
ral Gou.nty Solld WasteDlsposal Cbmplex
.. PHASEil C|-ASS I |-ANDRU-. EICAI{Sr}ilGOTISIRUGTION DRAUNNGS
m
inr w nnuc
AttTOlr/AnCSEtfiSS
sRgnailr
I Florida Depart*ent #
Envi ronmental ProtectionSouthwest District Office
13051 North Telecom Parkway
Temple Terrace, Florida 33637 -0926
CERTTFTED IlArL #7008 0150 0003 4894 2L28RETURN RECEIPT REQUESTED
NOTICE OF PERMIT
Sarasota County Solid Waste Operationsc/o Mr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, Fl. 34275
Re: Central County Solid Waste Disposal Complex (CCSWDC)Phase I Gas Collection and Control SysEem ConstructionPermit No. : t30542-OO9-SC/08, Sarasota County
Dear Mr. Coggins:
Enclosed is permit number L30542-009-SCl08, issued pursuant toSection(s) 403.087 (1) , Florida Statutes.
Any party to this Order (permit) has the right to seek judicialreview of the Order pursuant to Section I20.58, Florida Statutes, bythe filing of a Notice of Appeal pursuant to Rule 9.11-0, Florida Rulesof Appellate Procedure, with the Clerk of the Department in the Officeof General Counsel, 3900 Commonweal-th Blvd., MaiI Station 35,Tallahassee, 32399-3000; and by filing a copy of the Notice of Appealaccompanied by the applicable filing fees with the appropriateDistrict Court of Appeal. The Notice of Appeal must be filed within30 days from the date this Notice is filed with the Clerk of theDepartment.
Executed in Hillsborough County, Florida.
STATE OF FI,ORIDA DEPARTMENTOF E}WIRONMENTAL PROTECTION
DisErict DirectorSouthwest District
'll4ore Frotcction, Less Process
wrw.dep.state.fl. u.s
Charlie CristCovernor
felf Kortkanrp
Lt. Covernor
MichaelW. Sole
Secretary
JuIy 15, 2009
Deborah A.
oPERMIT NO: 130542-009-SC/08PERMITTEE: Sarasota
Mr. Frank Coggins,County Solid Waste Operations
Manager CCSWDC Phase I Gas Collection/Contro1 System Construction
CERTIFICATE OF SERVICE
This undersigned duly designated deputy clerk hereby certifiesthat this NOTICE OF PERMIT and Jtt copies were rnailed or transmittedelectronically to the addressee and the listed persons before theclose of business on JuIy 1-5, 2009 to the listed persons.
Clerk Stamp
FILING AI.ID ACKNOWI.EDGMEN:T FIIED,on this date, pursuant toSection L20.52 (11), FloridaStatutes, with the designatedDepartment Clerk, receipt ofwhich is herebv acknowledqed.
DAG/sgmAttachmentsCopies furnished to:
Sarasota Count.y Elected Officials Notificationcarlo Lebron, P.E.f HDR Engineering, rnc,, carlo.lebron8hdrinc.comRichard Tedder, FDEp TaIl_ahassee, (e-maiI)Frank Hornbrook, FDEP, Tall_ahassee, (e-mail)John Morrj_s, p.c., FDEP Tampa (e-mai1)Ronni Moore, OGC Tallahassee (e-mail)Susan Pelz, p.E., FDEp Tampa (e-mail)
(CIerk)
ooF'lorida Department of
Environmental ProtectionSouthwest District
13051 North Telecom ParkwayTemple Terrace, Florida 33637 -0926
Telephone: 813-632-7 600
PERMTTTEESarasota County
Solid Waste OperationsMr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, Florida 342js Sarasota
2701-2'6.57"N82023'34 . 07 "w
Sec,/Town,/Rge: 3/385/1,98ProjecL: Central County Solid Waste
Disposal Complex (CCSWDC),Phase I Gas Collection./ControlSystem Construction
This permit is issued under the provisions of Chapter 403, Florida Statutes,and Florida Administrative code Rule(s) 62-4, 62-302, 62-330, 62-520, 62-522,62-550, and 62-70l-. The above named. permitLee is hereby authorized t,o performthe work or operate the facility shown on Lhe application and approveddrawing(s), plans and other documenLs, attached hereto or referenced inSpecific Condition #A.2., and made a part hereof and specifically described asfollows:
To constrrrct a landfill gas collection and control system for an existingClass f landfill-, referred to as the Central County Solid WasLe DisposalComplex (CCSWDC) , Class I Landfill (Phase r), subject to the specific andgeneral conditions at.tached, located at the north end of Knights Trail Road, 2miles east of I-75, northeagt of Venice, Sarasota County, Florida. Thespecific conditions attached are for the construclion of:
1,. A landfill gas collection and control system.
GeneraL information:
Replaces Permit No.: N/A, new permit
This permit. cont,ains compliance items summarized in Attachnent 1 that shall becomplied with and submitted to the Department by the daLes not,ed. If thecompliance dat.es are not met and submittals are not received by the Departmenton the dates noted, enforcement action may be initiated to assure compliancewith the conditions of this permiL.
Page 1 of 15
Charlie CristGovernor
JeffKottkampLt. Govemor
Michael W. SoleSecretary
PERMIT/CERTIFICATION
Dat,e of Issue:. 07 /t5/2009Expiration Dat.e: 07 /L5/2OL4
WACS ID No:Permit No:
frnrrn{-rr.vvsrtuJ.
Lat,/Long:
swD/58/5]-6]4130542-009-SC/08
Gas extraction system70 verLical extraction we11s (6-inch slotted PVC pipe), below-grade lateral and header pipelines w/3 condensate knockoutpots, 2 condensate sumps (S-2 & S-3) and 3 condensate u-traps(U-1 to U-3). System is also connected to 3 existing leachatecleanouts on south and north sides of Phase I for condensatedrainage to existing leachate collection system. Landfill gasconveyed from Phase f via gas transmission line to landfil1 gascontrol unit located south of future Phase 3. Transmission linecondensate gravity drains to 3 condensate sumps (S-4 to S-5).fref. Sp. Cond. #A.2.a.(3). Sheets C-03 & C-051
Gas processing system Gas inlet from gas extraction system, knockout pot, 2 blowers,vertical candlesti-ck flare unit. Condensate collected at knockdown pot, blowers and flare drained via a 2' HDPE gravity d.rainline to condensate sump S-5. [ref. Sp. Cond.#A.2.a.(3), Sheet C-061
ooSarasota county SolLd waste OperaElone PERI{IT NO: 130542-009-sc/08
Cogg:lns, Manager CCSWDC Phase I cas CollectLon/Control System Con6tructLonPERMITTEE:Mr. FranJB
GENERAI. COIIDITIONS:
1. The terms, conditions, requirements, limitaLions and restrictions setforth in this permit, are "permit conditions" and are binding and enforceablepursuant to Sections 403.L4L, 403.161-, 403.727, or 403.861, Florida Statutes.The permittee is placed on notice that the Department will review this permitperiodically and may initiate enforcement. action for any viol-ation of theseconditions.
2. This permit is valid only for the specific processes and operationsapplied for and indicated in the approved drawings or exhibits. Anyunauthorized deviation from the approved drawings, exhibits, specificaLions,or conditions of this permit may constitute grounds for revocation andenforcement action by the Department.
3. As provided in subsections 403.087(6) and 403.722(5) , F.S., the issuaneeof this permit does not convey any vested rights or any exclusive privileges.Neither does it authorize any injury to public or private property or anyinvasion of rights, nor any infringement of federal, State, or 1oca1 laws orregulations. This permit is not a waiver of or approval of any otherDepartment permit that may be required for other aspects of the total projectwhich are noL addressed in this permit.
4. This permit conveys no tiLle to land or water, d.oes not constiLute Staterecognition or acknowledgmenL of t.itle, and does not constitute authority forthe use of submerged lands unless herein provided and the necessary title orleasehold interests have been obtained from the State. Only the Trustees ofthe Internal Improvement Trust Fund may express State opinion as to Litle.
5. This permit does not relieve the permittee from liability for harm orinjury to human health or welfare, animal, or plant 1ife, or property causedby the construction or operation of this permitted source, or from penaltiestherefore; nor does iL allow the permittee to cause pollution in contraventionof Florida Statutes and Department rules, unless specifically authorized by anorder from the Department.
6. The permittee shall properly operate and maintain the faciliEy andsystems of treatment and control (and related appurtenances) that areinstalLed and used by the permittee to achieve compliance with the conditionsof this permit, are required by Department rules. This provision includes theoperation of backup or auxiliary facilities or similar sysLems when necessaryto achieve compliance with the conditions of the permit and when required byDepartment ru1es.
7. The permittee, by accepting this permit, specifically agrees to allowauthorized Department personnel, upon presentation of credentials or otherdocuments as may be required by 1aw and. at reasonable times, access to thepremises where t.he permitted activity is located or conducted to:
(a) Have access Lo and copy any records that must be kept underconditions of the permit;
(b) Inspect the facility, equipment, practices, orregulaLed or required under this permit; and
(c) Sample or monitor any substances or parametersreasonably necessary Lo assure compliance with thisrules.
anarr l- i nn <vyv! se*v^.v
at any locationpermit or Department
Reasonable time may depend on the nature of the concern beinginvestigated.
Page 2 of 15
PERMITTEE: sarasota "ott
Solidt wasre operar:lons iI:[ NO! 130542-009-SC/08Mr. Franh Cogg:lns' Manager CCSV|DC Phase f caE Collaction/Control s?sten Constsnrclion
GENERAIJ CONDIETON9:
8. If, for any reason, the permittee does not comply with or will be unableto comply with any condition or limitation specified in this permit, thepermittee shall immediately provide the Department with the followinginformation:
(a) A description of and cause of noncompliance,. and
(b) The period of noncompliance, including d.ates and t.imesi or, if notcorrected, the anticipated time the noncompliance is expected tocontinue, and steps being taken to reduce, eliminate, and prevencrecurrence of the noncompliance.
The permittee shal-l be responsible for any and all damages which may resultand may be subject to enforcement action by the Department for penalties orfor revocation of this permit.
9. fn accepting this permit, the permittee understands and agrees that allrecords, notes, monitoring data and other information relating to theconstruction or operation of this permitted source which are submitted to theDepartment may be used by t.he Department as evidence in any enforcement caseinvolving the permitted source arising under the Florida Statutes orDepartment rules, except where such use is prescribed by Sections 403.111 and403.73, F.S. Such evidence sha11 only be used to the ext.ent it is consistentwith the Florida Rules of Civil Procedure and appropriate evidentiary ru1es.
l-0. The permittee agrees to comply with changes in Department rules andFlorida Statues after a reasonable t.ime for compliance; provided, however, thepermittee does not waive any other right.s granted by Florida Statutes orDepartment. rules
l-1. This permit is transferable only upon Department approval in accordancewith Rule 62-4.120 and 62-730.300, Florida Administrative Code, as applicable.The permitt.ee shal-l be liab1e for any non-compliance of the permitted activityuntil the transfer is approved by the Department.
L2. This permit or a copy thereof shal_Ipermitted activity.
13 . This permit also constitutes:
be kept at the work site of the
(a) Determination of Best Available Control Technology (BACT)
(b) Determination of Prevention of Significant Deterioration (PSD)
(c) Certification of compliance with State Water Quality Standards(Section 401, PL 92-500)
(d) Compliance with New Source Performance Standards
Page 3 of 15
pEnMxrrEE: sarasora "ounp""ridl
waEre operarions "nt No: 1305r[2-oo9-sc/08!lr. Frank Cogg:lns, llanager ccswDc Phase I caE Collectsion/Control gyst€n constructsion
GENENAIJ CONDITIONS:
1,4. The permitLee shall comply with the following:
(a) Upon request, the permittee shall furnish all records and plansrequired. under Department rules. During enforcement acLions, theretention period for aLl records will be extended auLomatically unlessotherwise stiputaLed by the Department.
(b) The permittee shal1 hold at the facility or other locationdesignated by this permit records of all monitoring information(including all calibration and mainLenance records and all originalstrip chart recordings for continuous monitoring insLrumentation)required by the permit, copies of all reports required by this permit,and records of all- data used to complete Lhe application for thispermit. These materials shal1 be retained at least three years from thedate of the sample, measurement, report, or application unless otherwisespecified by Department rule.
(c) Records of monitoring information shall include:
1. the date, exact place, and Lime of samplingf or measurements;2. the person responsible for performing t.he sampling or
measuremenc,s;3. the dates analyses were performed;4. the person responsible for performing the analyses;5. the analytical techniques or methods used;6. the results of such analyses.
1-5. When requested by the Department, the permittee shall within areasonable time furnish any information required by 1aw which is needed todetermine compliance with the permit. If the permittee becomes aware therelevant facts were not submitted or were incorrect in the permit applicationor in any report to the Department, such facts or information sha1l becorrected promptly.
Page 4 of 15
PERIIITIEE:Mr. Frank
sarasota ""t sorid waEte operarione t"rr No: 130542-ooe-sc/08
Coggins, Manager CCS!{DC Phase I caE Collection/control Sysuem ConstructLon
SPECfFIC COIIDITIONS: PART A -So1id. Waste Facility General Requirements
L. FaciX.ity Desigmation. This gas control system is designed to recovercombustible gas and shall be constructed, operated, closed, monitored and.maintained. in accordance with all applicable requirements of Chapters 62-4,62-302, 62-330, 62-520, 62-522, 52-550, and 62-7AL, Florida AdministrativeCode (F.A.C.) and all applicable requirements of Department rules.
2. Petmit Application Documentation. This permit is valid for constrrret,ionof a gas collection and control system for existing Central County So1id WasteDisposal Complex (CCSWDC), Class I Landfill (Phase I), in accordance with allapplicable requirements of Department rules and in accordance with thereports, plans and. other information prepared by HDR Engineering, Inc. (unlessotherwise specified) as follows:
a. Central County Solid Waste Disposal Complex Class I Landfill Phase
edDecember 30, 2008), as revised, replaced or amended (informationcollated into originals*) dated March l-3, 2009 (received March 26, 2009)and dated April 20, 2009 (received Apri1- 22, 2009). This informationincludes, but is not limited to:
L) Section 2 - Engineering Report;
2't Section 4 - Specifications,' and
3) PIan Sheets titled, Permit Drawings for Central County SolidWaste Disposal Compl-ex, Sarasota County Phase I Gas Collection andControl Systenr... (17 Sheets) signed and sealed April 20, 2009(received ApriL 22, 2009).
Permit Modificatioas.a. Any construction, operation or other activities not previouslyapproved as part of this permit sha1l require a separate Departmentpermit unless the Department determines a permit modification to be moreappropriat.e, or unless otherwise approved in writing by the Department.Any significant changes to the construction or operation at the facilityshall require a permit modification. Permits shal-l be modified inaccordance with the requirements of Rule 62-4.080, F.A.C. A modificationwhich is reasonably expected to lead to substantially differentenvironment.al impacts which require a detailed review by the Departmen!is considered a substantial modification.
b. This permit authorizes the construction of the PhaEe I gascollection and control system and other related appurtenances, only.
4. Permit Renewal. On or before ilanuary 1, 2014 the permittee shal1 notifythe Department in writing or electronically of its intent to apply for renewalof this permit. and of the anticipated date of submittal of the permit renewal-application. No later than May 1, 2014, the permittee shaI1 apply for arenewal of a permit on forms and in a manner prescribed by the Department, inorder Lo assure conformance with all applicable Department rules. Permitsshall be renewed at. l-east every five years as required by Rule 62-4.090,F.A.C. and Rule 62-701.320 (10) (b) , F.A.C. In the event that the regulationsgoverning this permitted construction are revised, the permit renewal shallinclude modification of those specific construction conditions which areaffected by Lhe revision of regulations to incorporate those revisions inaccordance with Specific Condition A.8.
* see OCULUS for un-collaled submittals
Page 5 of 15
PERMTT FEE: sarasota ""J|solld
waste op€ratsions "tr No: 130542-ooe-sc/o'Ur. Frank Coggins, Manager CCSD|DC Ph,ase I Gas Collection/Control System Construction
SPECIFIC COIIDITIONS: PART A -Solid V[aste facilitv General RecruirernentE
5. Professional Certification. Where required by Chapter 471- (P.E.) orChapter 492 (P.c. ), Fl-orida Statutes, applicable portions of permiLapplications and supporting d.ocuments which are submitted to the Departmentfor public record shall be signed and sealed by the professional (s) whoprepared or approved them.
6. General Cond,itions. The permiEtee shall be aware of and operate underthe "General Conditions. " General Conditions are binding upon the permitteeand enforceable pursuant to Chapter 403, Florida St.atutes.
7. Permit Aqceptance. By acceptance of this permit, the permitteecertifies that he/she has read and understands the obligations imposed by theSpecific and General Conditions conLained herein and also including date ofpermit expiration and renewal d.eadlines. It is a violation of this permit forfailure to comply with all condit.ions and deadlines.
8. Regulations. Chapter 62-701, F.A.C., effective NIay 27, 2001, isincorporated into this permit by reference. fn the event that the regulationsgoverning this permitt.ed operation are revised, the Department shal-l notifythe permittee, and the permittee shall request modification of those specificconditi-ons which are affected by the revision of regulations to incorporatethose revisions.
9. Prohibitions. The prohibitions of Rule 62-701.300, F.A.C., shall not beviol-ated by the activities at this facility.
a. In the event t,hat limestone is encountered during excavation orconstruction activities, the excavation/construction acLivities shaIlcease and the Department shall be notified within 24 hours of discovery.Written notification shall be submitted within 7 d.ays of d.iscowery. Thewritten notification shall includ.e the location, el-evation, and extentof limestone noted on a plan sheet, a description of the materialsencountered, and a plan of action which ensures that groundwater willnot be adversely affected by the continued construction and operation ofthe faciliLy. Excavation or construction activities sha1l not resume inthe affected area until the Department-approved plan of action has beencompleted.
b. fn the event that, surface depressions or other occurrences whichmay be indicative of sinkhole activity or subsurface instability, arediscovered on-site, or within 500 feet of the site, the Department sha1lbe notified in accordance with Specific Condit.ion #C.6.b. The writt.ennotification shal1 include a description of the incident, the locationand size of the affected area shown on an appropriate plan sheet, and acorrective action plan which describes the actions necessary to prevenLthe unimpeded discharge of waste or leachate into ground or surfacewatrer.
c. Open burning of sol-id waste is prohibited except in accordancewirh Rule 62-70L.300(3) and chapter 62-256, F.A.c. A1l fires whichrequire longer than one (1) hour to exLinguish must be promptly reportedto the Department in accordance with Specific Condition #C.6.b.
Page 6 of
PERMITTEE: sarasoga ""O
Solidt wasre operations il"rr No: 1305{2-ooe-sc/08Mr. Frank Coggine' Manager CcSlfDC Ptrase I caE CollecEion/Control Sygtem Const,fuct,Lotr,
SPECfFIC COIIDITIONS: PART B - Constnrction Requirements
l-. Construction. A11 significant construction activities sha1l be approvedby the Department prior to initiating work, unless specifically authorized.otherwise.
a. This permit authorizes the construction of the gas collection andcontrol system for Phase I of the Class I landfill and relatedappurtenances on1y.
2. Certification of Construction Conpletion. A11 information required bythis Specific Condition shall be signed and sealed by a registered.professional engineer or land surveyor as appropriate.
a. Within sixty (50) dlayE after Lhe specified construction has beencompleted, the following activi-t.ies sha1l be completed and submitted byEhe permittee for Department approval. Operation of the constructedsystems, structures, equipment, etc., shal1 not be initiated prior toDepartment approval of the informat.ion required by this SpecificCondition:
l-) The owner or operator sha11 submit a Certificat,ion ofConstruction Completion, Form 62-701.900(2), signed and sealed bythe professional engineer in charge of construction and gualityassurance to the Departnent for approval, and shall arrange forDepartment representatives to inspect the construction in thecompany of the permittee, the engineer, and the facility operator.
2) The owner or operator shalf submit Record Drawings/Documentsshowing all changes (i.e., all additions, deletions, revisions tothe plans previously approved by the Department including sitegrades and elevations). The Record Documents shall include, butnot. be limited, to as-built p1ans, details and elevations(survey).
?\ The owner or operator sha1l submit a narrative indicatingall changes in plans, the cause of the deviations, andcertification of the Record Drawings/Documents by the Engineer tothe Department.
4) The professional engineer of record. sha11 submit to theDepartment a final report to verify conformance with the plans andspecifications in accordance with Rules 62-'701.400(7) and (8),F.A. C .
3. Record Drawings./Docunents. The Record Drawings/Documents sha11 include,but not be limited to, Ehe foll-owing information:
a. As-built survey of location and elevations along landfill gasheader and transmission lines and condensate discharqe l-ines and drainpipes [ref. Spec 02221-3.9.A.)i
b. Ground surface elevations and well depths for each of theextraction wells and horizontal collector vertical borings listed on the"Well Schedule" identified on Sheet D-01- of the ConstrucLion Drawings[ref. Sp. Cond. #A.2.a.(3)];
c. Copies of photographs documenting all stages of the constructionproj ect;
Page 7 of 15
PER$ITTEE! Sarasota CountyMr. FraDJr Coggrins, Manager
Solid WaEte Oparations PERMI'f NO: 130542-009-SC/08CCSWDC Phase I Gas Collection/ControL sysuem Constructiorr
SPECIFIC COIIDITIONS: PART B - Constnretion Requirements
4. Pre-Constmction Meeting Notification. Department Solid WastePermitting staff shall be notified at least one (1) week prior to all pre-construction meetings. Prior to initiating construction activiLies, thepermittee sha1l make arrangements for the Engineer of Record to meet on siteand discuss all plan changes wiLh DeparEment Solid Waste Permitting SEaff. Acopy of the minutes from the pre-construcLion conference shall be submit.ted tothe Department within two (2) weeks of the conference.
5. Construstion Schedule and Progress Report.a. The Engineer of Record or another gualified professional engineersha1l make periodic inspections during construction to ensure thatdaci nn i nl-----egrrty t_s ma1nEat_nect.
b. An updated construction schedule and progress report shall besubmitted to the Department. monthly, by the 15th of each monlh. Themonthly progress report should be submitted electronically in PDF formator in an appropriately labeled three-ring binder of suffj-cient size tostore the monthly progress reports for the entire project. The monthlyprogress reports shal1 include, but not be limited to:
1) A narrative explaining the status (and any delays) of majorstages of the construction;
2) A summary of submittals and change order requests;
3) Week1y progress meeting minutes; and
4) Color copies of photographs, which are representative of thetlpical construction activities for the reporting period, andwhich show overall views and details of major stages ofconstruction. ff digital photographs are taken, a CD-Romcontaining the photographs may be submitted in l-ieu of printedcopies
6. Constnrction Tolerances. Invert elevaLions of the landfi11 gascollection and control pipes shall be recorded at a frequency sufficient todemonstrate that the headers and l-at.erals have been constructed to the slopesand grades shown on the drawings and. will drain adequaLely. This informationsha11 be included with the Record Documents.
7. Laboratory and Field Testing Requirements. Field and faboraLory tesLingduring the construction acLivities shal1 be conducLed by a gualified testinglaboratorv.
Construction Quality AeEurance.A complete set of construcLion drawings and shop drawingts, which
shal] be maintainedinclude daily additions, delet.ions and revisions,on-site at all times for reference.
b. Leachate or gas condensate shall not be deposited, injected,dumped, spilled, leaked, or discharged in any manner to t.he land,surface water or groundwater at any time during the constructionactivities.
UnsatisfacLory, d.efective or non-conforming work sha1l be reportedto the Engineer and sha11 be corrected, or the reasons for notcorrecting the work sha]I be recorded and maintained onsite forreference and inspections. Documentation of the corrections or reasonsfor not. correcting the work sha11 be submitt.ed with the Record Documentsrequired by Specific Conditions #B.3.
Page 8 of 15
PERIIITTEE: Sarasota CouDUyUr. Frank Cogrgins, ![anager
SolLd. llasto OEerations PERIIIT NO: 1305r[2-009-SC/08CCSWDC Pbase I cas Collection/Control SyEt€n Conetnrction
SPECIFXC COIIDITIONS: PART B - Constrrrction Requirements
(Specific Condition #B.8., cont,d)d. Excavated refuse shal-l be loaded and transported to the Class Ilandfi11 working face by the end of each working day. No refuse shallbe allowed to remain uncovered overnight. The refuse must be removedimmediately during any rain event to prevent stormwater from contactingthe refuse. [ref. Spec 02221-3.3 A. & B.]
e. The non-perforated PVC laterals, leachate and condensate drainlines, connections to LFG header, and air supply lines, shall besubjected to pressure tests to detect any leaks in Lhe pipingf. [ref. Spec
1s060-3.41
f. A11 dewatering liguids sha1l be managed as leachate.
Page 9 of 15
PERMITTEE: SarasoUa County Solld Waste OperauionE pER!.tIE NO: 130542-009-SC/08Mr. Frenk Coggins, Manager CCSVIDC PhaEe I CaE Collection/Control gyst€D ConsUr.lrctl-on
SPECIFIC COIIDITIONS: PART C - Operation Requirements
1. Facility Ogreration Requirements.a. The permittee sha1l operate this facility in accordance withChapter 62-701,, F.A.c., and Operation permit No. L30542-007-So-01,(including modifications, if any), or its successors.
b. ThiscollectionfollowingPermittee,
and controlrequirementsand approved
permrc does not authorize Lhe operation of the Phase I gassystem and other related appurtenances until thehave been completed and submitted by theby the Department:
l-) Certification of Construct.ion Completion requirements ofSpecific Conditions #B. 2 . and #B. 3 . ,
2) Issuance of a permit modification of OperaLion Permit No.l-30542-007-sO-01- or its successor, which authorizes operation ofthe landfill gas collection and control system and its relatedappurE.enances.
The permittee may t.emporarily operate the constructed. system for up to180 days to allow for syst.em starL-up and operational adjustments whilethe certification of construcLion completion submitEals and approvalsrequired by this specific condition are completed. The permit shal1notify the Department electronically or in writing of the start d.ate fortemporary start-up operation of the system.
c. Leachate and,/or gas condensate shall not. be deposited, injected,dumped., spi1led, leaked, or discharged in any manner to soils, surfacewater or groundwater outside the liner and leachate management systemsat any time during the construction or operation of t,his facility.
2. Facility Personnel. The owrrer or operaror shall provi-de adequatepersonnel for constructing, operating, monitoring and maintaining the facilityin an orderly, safe, and sanitary manner.
3. control of Access. Access to, and use of, the facility sha11 becontrolled as required by Rule 62-701_.500 (5), F.A.C.
4. Monitoring of Waste. WasLes shall be monit.ored as reguired by OperationPermit No. 130542-007-so-01-, (including modifications, if any), or itssuccessors.
5. Control of Nuisance ConditionE. The owner or operator shall- controlodors, vect.ors (mosquitoes, other insecLs, rodents), and fugitive particulat.es(dust, smoke) arising from t.he construction and operation so as to protect thepublic health and we]fare. Such control sha11 minimize the creation ofnuisance conditions on adjoining property. Odors observed. by Deparcmenupersonnel upon site inspection, shall constitute a nuisance condition, and. thepermittee must t.ake immediate correcti-ve action to abate the nuisance.
Pagre 10 of L5
PERMTTTEE: sarasota ""pt
solld waste operatl.ons p'EFurc No: 130542-oo9-gc/08Ur. Frank Coggins, llanager CCSWDC Phase f Gas Collection/Control Sygtsem Conslnrct:lon
SPECIFIC CONDITIONS: PARI C - Operation Requirernents
1
Facility Maintenance and, Repair.a. The site shal1 be properly maintained including maintenance ofaccess roads to disposal areas, equipment, stormwater and leachatemanagement systems, cover systems and berms, gds monitoring andmanagement sysLems, surface water monitoring system, and groundwatermonitoring system. Erosion and ponded water in disposal areas shall beprevented.
b. In the event of damage to any portion of the landfil1 sitefacilities, unauthorized. l-eachate discharges, failure of any portion ofthe landfill systems (incfuding damaged or dry groundwater moniEoringwel1s), fire, explosion, the development of sinkhole(s) or othersubsurface instability at the site, the permittee shall imrediately(within 2{ hourE) notify the Department explaining such occurrence andremedial measures to be taken, method to prevent reoccurrence, and timeneeded for repairs. written, detailed notification sball be submittedto the Department within Eeven (7) days following tbe occurrenceRoutine maintenance does not require notification but shall be noted ondaily reports.
Storffi,vat€r Management. The site shall have a surface water managementsyst.em designed, constructed, operated, and maintained to prevent surfacewater from running on to waste filled areas, and a stormwater runoff controlsystem designed, constructed, operaLed, and maintained to collect and controlstormwater to meet Ehe requirements of Chapter 62-330, F.A.C., and Lherequirements for managfemenL and storage of surface water in accordance withRule 62-701.500(10), F.A.C., to meet applicable standards of Chapters 62-3,62-302, and 62-330, F.A.C. The stormwater management system shall beinspected for damage and proper operation daily.
Page 11 of 15
Solid WasUe Operat:Lons PERIIIT NO: 130542-009-SC/08Mr. Frank Coggins, Manager CCSWDC Phase I Gas CollectLon/Control SyEtem Construction
SPECIFIC CONDITIONS: PART D - Record,keepins
L. Report Suhnittals. Unless otherwise specified, all submiLtals,notifications, requests for permit. modification, reports for compliance withthis permit, etc., shall- be sent to: Solid Waste SecLion, Department ofEnvironmental ProtecLion, Southwest District. Office, L3051 North TelecomParkway, Temple Terrace, Florida 33637-0926.
2. operation Plan and Operating Record.. Each landfill owner or operatorshal1 have an operational plan which meets the requirements of Rule 62-701-.500(2), F.A.C. A copy of the Department approved permit, operationalp1an, construction reports and record drawings, and supporLing informationshall be kept at the faci1ity at alt times for reference and inspections.Operat.ing records as required by Rule 62-701.500(3), F.A.C., are part of theoperations p1an, and sha11 also be maintained at the site.
3. $Iaste Record.s. The permittee shall maintain all records required by theconstruction specifications, and this permit on-site, and shall provide copiesto the Department upon request, unless specified otherwise.
4. Financial Assuranc€. The permittee sha11 provide adequate financialassurance for this facility and related appurtenances in accordance wiEh RuLe62-70t.630, F.A.C. and Operation Permit No. 130542-007-SO-01- (includingmodifications, if any), or its successors.
SPECIFIC COIIDITIONS: PART E - Water Oualitv Monitorincr RecruirementE
l-. Water Quality Monitoring Quality Assuranee. Water quality monitoringshall be conducted as required by Operation Permit No. L30542-007-SO-01-(including modifications, if any), or its successors.
Page L2 of 15
PERUITTEE: Sarasota "otyMr. Frank Cogg:Lns, ManaEer
trr No: 130542-ooe-sc./ogSolid, WaEt,e Operat:LonsCCSWDC Phase I cas Collection/Contsrol syst€s CoastnuctLon
l_.
SPECIFIC CONDITIONS! PART F - IJandfill Gas MauaEement
Landfill cas - NSPS and Title V Air Requirenents.a. This solid waste permit will meet the statutory requirement toobtain an air construction permit before modifying or constructing asource of air pollution, except for those landfi11s that are subject Eothe prevention of significant deterioration (PSD) requirements ofChapter 62-212, F.A.C. Facilities that are subject to the PSDrequirements shal1 obtain an air construcEion permit from the Bureau ofAir Regulation prior to beginning construction or modification pursuantto RuLe 62-2L0.400, F.A.C.
b. The permittee shall comply with any applicable Title V airoperation permit application requirements of Chapter 62-21-3, F.A.C., and.40 CFR 60, Subparts WWW and CC, as adopted by reference at Rule 52-204.800, F.A.C. Title V Permit applications sha1l be submitted to theDistrict Air Program AdministraLor or County Air Program Administratorwith air permitting authority for the 1andfi1l.
c. The permittee sha1l submit to the Division of Air ResourcesManagement, Department of Environmental Protection, Mail Station 5500,3900 Commonwealth B1vd., Tallahassee, FL 32399-3000, any amended designcapacity report and any Non-Methane Organic Compound (NMOC) emissionrate report, as applicable, pursuant to 40 CFR 60.757(a)(3) and (b).
Gas Monitoring and Control.a. Landfill gas shal1 be moniLored Lo demonstrate compliance with thecriteria est,ablished in Rule 62-701.530(1) (a), F.A.c. (less than 258 ofthe lower explosive limit (LEL) for combustible gases in structures andless than 1-00* of the LEL for combustible gases at or beyond theproperty boundary).
b. The owner or operator sha]l control tandfilt gas after theshutdown of the active landfill gas collection system (i.e., 9ds is nolonger routed to the boiler or the flare). fn the event that a passivegas ventingt system is required the owner or operator shalf submit anapplication for minor permit modificauion to authorize itscons truction/ operation .
3. cas Monitoring Locat:Lons. Landfill gas monitoring sha11 be conducted asreguired by operation Permit No. 130542-007-so-01 (including modifications, ifany) , or its successors.
4. Gas Remed,iation. In the event that the Lower Explosive Limit (LEL) isgreater than 25* inside sLructures both on and off of the landfill site, orgreater than 1-00t at the property boundary, the owner shall submit Lo theDepartment, within 7 days of detection, a remediation plan detailing thenature and extent of the problem and the proposed remedy. The remedy shall becompleted within 60 days of detection unless otherwise approved by theDepartment.
Page 13 of 15
PERIiTITTEE! Sarasota County Solid, waste Operations PERMII NO: 130542-009-SC/08Mr. Frank Coggl,ne, Manager CCSWDC Phase I Gas Collection/Control SyEtem Construction
sPEcxFrc co![DrrroNS: PART G - closure and r,ong-Term care Requirements
l-. CloEure Permit Requirements. No later than ninety (90) days prior tothe date when wastes will- no longer be accepted for portions of the 1andfillwhich have reached. closure design dimensions, the landfill owner or operatorshall- submit a closure permit application to the Department, in order toassure conformance with all applicabLe DepartmenL ru1es. A closure permit isrequired. prior to implementing closure related acLivities.
2. FinaL Cover. Portions of the landfilI which have been filled with wasteto the extent of designed dimensions shall be closed (shal-I receive finalcover) within 1-80 days after reaching design dimensions, in accordance withRule 62-701.500(7) (S), F.A.C. and all applicable requirements of Departrnent,rules.
Irorrg-Term Care Requirements.a. The owner or operator shal-l perform long-term care for the site inaccord.ance with Rule 62-701-.620, F.A.C., and the conditions of OperationPermit No. i-30542-007-so-01 (including modifications, if any), or itssuccessors.
b. Long-t.erm care includes, but is not limited to, water quality,I eachate and gas monitoring, maintenance of the final cover system,maintenance of the leachate collection and removal system, erosioncont.rol, and the prevention of ponding within disposal areas.
4. UEe of Closed, Landfill Areas. Prior to irnplementation, the owner oroperator shal1 submit a plan for any proposed uses of the cLosed portions ofthe landfill to the Department. for approval. This plan shall include adescription of the proposed use and evaluation of the impact on the exist.ingl-andfill systems (e.g. finaL cover, leachate collection, bottom liner),engineering designs, calculations and plans as appropriate, etc. The proposedactivity shall not be initiated without. prior Department approval, and mayreguire a permit modification or separate permit.
Executed in Hillsborough County, Florida.
STATE OF FLORIDA DEPARTMENTOF ENVIRONMENTAL PROTECTION
DisLrict DirectorSouthwest Dist.rict.
Page 14 of 15
trn, No: 130542-ooe-sc/08!|l. Frank Coggins, l[anager CCSWDC Phase I cas Collectl.on/Control gystes CoD,strnrceLon
AT,IIACIII{ENT 1
SPECIFICCOIIDITION
SI'BITITTAL DUE DATE REQUIRED ITEM
A.4 No later than ,fanuary L,20]-4
No later than May 1, 2014
NotificaLion of date ofpermit renewalapplication submittal
Submit application forpermit renewal
A.9.a. Within 24 hours ofdiscovery
Within 7 days of verbalnotification
Notification of sinkholesor subsurface instability
Written notification &
corective action plan
8.2.a. Within 60 days ofcompletion
Submit certification ofconstruction completion,record drawings, etc.
B.4 . At Least 1 week prior
No later than 2 week afterpre-construction meeting
Notify of preconstructionmeeting
Submit meeting minuEes
8.5.b. Monthly, by the 15"" eachmonth
Submit monthly progressreport & schedule
c.6.b.discovery
Within 7 days of verbalnotification
ofz+ rshi Notification of:sinkholes, failure oflandfi1l sysLems orequipment, etc.
Written notification &
corrective action plan
Page 15 of 15
SffE P+rmit
Sile Name IS*RASOTA CO CEIITRAL CoUHTY COtTPLEX CL*5s I LF iLrli i Sib* 10130542
Csudy lsARAloTA- Proiect
Permit* I ,-i-- -f. -- Froiecl* Fs *
cornrnerfis lrt HFf,$ IH *cases {il
Received lllrsltr?S*S CRA* i3r98$0
FBr.rnit OficE lsT',ll (olsTRlcT) Agency Action lPending
Proiect l$ame l5}lp'sF*T& i'j* 1..t 4'aE it1't3tt!,i oesc i
T}pet$uftfies F" tll!$- lortlrR wAcstD occ rloss*o Fi.i!i3q@]l' s*u*o f--*-
_.- e*pi*u [-]l--]] ApplicatonA'tion liffir--
ree i- r.J.tn.$* FeeRecd f 1000,00 gete i--- cOE* l--- Ow1{g* ln*t*-
End [-IAPFLEAT{T Begiil iq{r};l:!i{}**
ICgGGIH$, FRAt{X i Company lsARAsorA caullTY
Rsle
Name
Address
City
Fhsna
Ittoxontts
HUIGflTS TRAIL ROftD
lr*sidrijtrr. $
$tare lil* zip Fqazs- Country lu.s.A.
..* '[*- - .. IEma$ I
Pmcesmrs
F ncnre lG.i.'qus lnr.ft" {--
gsl Slg@ .,..1 JIli t]I!Hl liFl 3!
Ramittancsln f mrl Tlmet fE[-*Eyslem Receipt T s*'ttc pNn f"--
SS[\[FE|D Ngms* F;mF&*r}rJfiry5sil*msr [- Hiddte l-- nt* i-_--.___ suft T-
Addn8sl lsoln Y'fisrE o,ptRffions
Cliy l$drffi ST lru Zip l3'€I5 -t
cour,t'vf--_-* shortcomments @PAYfEHT{$
PaymenltD CLArea Cod€rDescripton PaFnenl*rnour* Rsf€r€nre# Appl Fund* Orant" Stefue
Tm Fn-* lffi ffiEm_- f---ffi f- F- Frf"- l*-:* Fffi :[i-|*+*r--r-r-_[*'r}+i__<_l----1---t*-" f
**- i-_ --
f---- ****-* r--- T-r* * f---T-T- l*-;
8el 8lg@.,, gJfUIJIgI-l g3]llSITE Pernh
Slte Name lsARAsgTA co EEE Rl{l6t CL-Itss I LF (LFl}
countY $nnnsora
Femn*l -l *-[-_*Permit Olice iswl}(olsTRlcri
FIoJecl NsmB l$A!{Jls{}T,4 {{} i.F $}:'* li"r5T[tt
Typelguboes it{: ,ls** Io?HER
hssro lfrt?6*-- rssueo ill--*-fee | {fic:$.*fl Fee Recd
* cases li-
*genry*aionffi
coe * [*- ooc f-f
- AspllcafionActon m-
oeh l-- o/Bnide lllollt---.-*-
enc [--ISARASOTA COUltrY
3+r?5 - County lu's'A.
I Stt€ * 101t4004s
tr F*Projact
loor=_#
Role
NamE
Address
Citf
Phone
lApPLrcAilr
HTIIGHTs TRAIL RSAD
ifi"t61 ,r5?o t.--$tab lrl-
-Proeasgors-
Processor lrutr,r''.,tn'* s - l[ ncfits lr:"tlt''f8{t$ tnr.uo [-=- ffi i
Brantley. Anna
From:Sent:To:
Brantley, AnnaWednesday, July 15, 2009lI:26 ANITedder, Richard; Hornbrook, Frank; Morris, John R.; Moore, Ronni;Commissioner Carolyn Mason; Commissioner Joe Barbettra; CommissionerJon Thaxton; Commissioner Nora Patterson; Commissioner Shannon Staub;County Administrator Jim Ley; Representative Darryl E. Rouson;Representative Doug Holder; Representative Keith Fitzgerald; RepresentativeKenneth Roberson; Representative Ron Reagan; Senator Michael Bennett;SenatorNancy DetertMorgan, Steve; Pelz, SusanSarasota CCSWDC Phase II Construction 130542-009-SC-08 NOP dated andmailed 7-I5-2009.pdf - Adobe Acrobat ProfessionalSarasota CCSWDC Phase tr Construction 130542-009-SC-08 NOP dated andmailed 7-15-2009
Cc:Subject:
Attachments:
Please find attached an electronic copy of the lssued Final Permit for Sarasota CCSWDC Phase llConstruction "Permit #130542-@9-SC/08" dated and mailed 7-LS-ZOO9.
Anna
Anna BrantleyAd mini strative Asslsfanf //FL DEP I SWD / Waste Managment13051 North Telecom ParkwayTemple Tenace FL 33637-0629Tel: 813/632-760a, Ext. 377Fax: 813/632-7664an n a. b rantlev@ d e rs. state.fl. u s
Memorandum
Florida llepartment ofE nvironmental Protection
ERO'I/THROUGH:Wifl-iam KutashSusan PeLz, P.E,Steve Morqan
PERTfiT COVER MEIIO
Fer x 'Lerah *. €eCzeffi ^*str*et D*ree€er
ENI/IRONMENIEI ADMINTS1RAEORSOLID WASTE MAIIAGER f .l,lQsolrD r{AsrE eanurrrwc//t 1l$!" U
PROGR,M :
DAIE: JuLy 14, 2009
I'ILE I{AME: Sarasota CCSWDC Phase I Gas Col]ectionand Control- System Construction
Solid Waste
TYPE OF PERMIT ACTTON; ISST'E FII{AIJ PERMIT
PERMIT Sut't'tARY: This permit applicationcollection and controf system for PhaseLandfill. An Intent to Issue was senE EoPubl-ication of Notice of Proposed Agencyfhi rcl-narfw net i tiOns filed.
PERI.{IT {f : 130542-009-SC/08COUNTY : Sarasota
is for construction of a fandfill gasI of the existing Sarasota CCSWDC Class Ithe applicant on 6/18/09. Proof ofAction was received on July 1, 2009. No
PROETSSIONAT RECOMMENDATION : APPROVE DENC
provided sufficient information torul-es to allow issuance of the permit
x
EVAIJUATION SUMI-IARY: The applicant hasrlamnnai- r:*a ^^nnl i anr:e wi f h Denaftment-
DAy 90/30 FOR rHrs AcrrON rs, Dalggj_9f:31:gg
TIH= 196; TIP=113 {Eo O7/L4/091 TTPApplication rec'd 12 /30 /08KA.L f-L SENI 0r/29/09 30RAI #1 response rec'd 03/26/09Suppfemental information recr d 04/22/09Application complete 03/26/09Intent to Issue to applicant 06/11/09 82Proof of pubfication rec'd 0'1/07/09Fina] Permlt routed for siqnature 01 /74/09
Postage
Certifisd Fe€
Rotirn Receipl Fee(Endorsenent Required)
Restrictsd Delivsry Feg(Endorsement Requked)
Total Postag(
Sarasota County Solid Waste Operationsc/o Mr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, FL 34275
Complete items 1, 2, and 3. Alsb completeitem 4 if Restricted Delivery is desired.Print your narne and address on the reverseeo.tftdt we can return the card to you.Attach this card to the back of the mailpiece,or on the front if space permits.
'1. Articla Addressed to:
Sarasota County Solid Waste Operationsc/o Mr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, FL 34275 3.,Servlce Type
)EfCertlReO Ualt E qprcss Uait
Tssraep P{UrI' * t3 t {v-z-zot-Se .. El Registered iEFfaum Recetpt for Mercfpndise
I E tnsureo Mail - El c.o.D.
5*-^ s. -L C C- S.r. DC f,Aou / (:-s 4. Restricted Delivery? (Extn F@) D Yes
2. Article Number(fnnste r f ro m se ru i ce I abel) ?u06 u15u u0B3 '+81q aleE
EO
rurlru
!ITEtr!
m[:EEEltlr:lt3EO
EfEr\-
1-(S -?LiPostmark
Here
t
I
I
ffiT-ffig#*rtu\f_ ffiffiffi
'sii;68'F*'N;.or PO Box tlo.
address different fiom item
lf YES, enter delivery address below:
PS Form 381 1, February 2oo4 Domestic Retum Receipt 1 02595"O2-M-t 540
O Florida Department #Envi ronmental Protection
Southwest District Office
13051 North Telecom ParkwaY
Temple Terrace, Florida 33637 -0926
Charlie CristCovernor
f eff Kottkamp
Lt. Covernor
MichaelW. Sole
Secretary
July 15, 2009CERTTFTED MArL #7008 0L50 0003 4894 2128RETURN RECEIPT REQUESTED
NOTICE OF PERMIT
Sarasota County Solid Waste Operationsc/o Mr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, FI. 34275
Re: Central County Solid Waste Disposal Complex (CCSWDC)
Phase I Gas Collection and Control System ConstructionPermit No. : L30542-009-SC/08, Sarasota County
Dear Mr. Coggins:
Enclosed is permit number L30542-009-SC/08, issued pursuant toSection(s) 403.087 (1-) , Florida Statutes.
Any party to this Order (permit) has the right to seek judicialreview of the Order pursuant to Section L20.58, Florida Statutes, bythe filing of a Notice of Appeal pursuanE to Rule 9.1L0, Florida Rules
r of AppellaLe Procedure, with the Clerk of the DepartmenE in the Officeof General Counsel, 3900 Commonwealth BIvd., Mail Station 35,Tallahassee, 32399-3000; and by filing a copy of the Notice of Appeal
' accompanied by the applicable filing fees with the appropriateDistrict Court of Appeal. The Notice of Appeal must be filed within30 days from the date this Notice is filed with the Clerk of theDepartment.
Executed in Hillsborough County, Florida.
STATE OF FLORIDA DEPARTMENTOF E}iVIRONMENTAL PROTECTION
District DirectorSouthwest District
"More Protection, Less Process
v+,r,r.,u'. d e p. s t a t c. fl. u.s
Deborah A.
PERMITTEE: SarasotaMr. Frank Coggins,
aoorprotid waste operarions "t,
No: 130542-009-sc/08Manager CCSWDC Phase I Gas Collection/Control System Construction
CERTIFICATE OF SERVICE
This undersigned duly designated deputy clerk hereby certifiesthat this NOTICE OF PERMIT and all copies were mailed or transmittedel-ectronically to the addressee and the listed persons before theclose of business on July 15., 2009 to the listed persons.
Clerk Stamp
FILING A}ID ACKNOTTLEDE|ENT FII.ED,on this date, pursuant toSection 720.52 (11) , FloridaStatutes, with the designatedDepartment. C1erk, receipt ofwhich is hereby acknowledged.
(CIerk)
oAG,/sgmAttachmentsCopies furnished to:
Sarasota County Elected Officials Notificat.ionCarlo Lebron. P.8., HDR Engineering, Inc., [email protected] Tedder, FDEp Tallahassee, (e-mail)Frank Hornbrook, FDEp, Tallahassee, (e_mail)John Morris, p.G., FDEP Tampa (e-nail)Ronni Moore, OGC Tallahassee (e-mail)Susan Pe1z, p.E., FDEP Tampa (ermail)
oFlorida Department of
Environmental ProtectionSouthwest District
13051 North Telecom ParkwayTemple Terrace, Florida 33637 -0926
Telephone: 813-632-i 600
PERMIT/CERTIFICATION
Charlie CristGovernor
Jeff KottkampLt. Govemor
Michael W. SoleSecretary
PERMITTEESarasota County
Solid Wast,e OperationsMr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, Florida 34275
WACS ID NO:Permit No:
/anrrnfrr.uvurruJ.Lat/Long:
swD/s8lsl-61-4130542-009-SC/08
DaLe of Issue: 0711,512009Expiration Date: O7 /1,512O1,4
Sarasota270L2 '6.57 "N82023 '34.07*W
Sec/Town/Rge: 3/385/I9EProject: Central County Solid Waste
Disposal Complex (CCSWDC),Phase I Gas Collection/ControlSystem Construction
This permit is issued under the provj-sions of Chapter 403, Florida Statutes,and rlorida Administrative Code RuIe(s) 62-4, 62-302, 62-330, 62-520, 62-522,62-550, and 62-70L. the above named permittee is hereby authorized to performthe work or operate the facility shown on the application and approveddrawing(s), plans and other documenLs, attached hereto or referenced inSpecific Condition #A.2., and made a part hereof and specifically described asfollows:
To construct a landfill gas collection and control system for an existingClass I landfill, referred to as the Central County Solid WasLe DisposalComplex (CCSWDC), Class I Landfill (Phase I), subject to the specific andgeneral conditions aLtached, located at the north end of Knights TraiL Road' 2
miLee east of I-75r northeast of Venice, SaraEota County, Florida. Thespecific conditions attached are for the construction of:
1. A landfi]l qas collection and control svstem.
General information:
Replaces Permit No.: N/A, new permit,
This permit conLains compliance items summarized in Attsachment 1 that shall becomplj-ed with and submitted to Lhe Department by the dates noted. If thecompliance dates are not met and submiLtals are not received by the Departmenton the dates noted, enforcement action may be initiated to assure compliancewith the conditions of t,his permit.
Page 1 of 15
Phasextraction svsLem
70 verLical extraction we1ls (5-inch sloLted PVC pipe), below-grade lateral and header pipelines w/3 condensate knockoutpots, 2 condensaLe sumps (S-2 & S-3) and 3 condensate u-traps(U-1 to U-3). system is also connected to 3 existing leachatecleanouts on south and north sides of Phase I for condensatedrai-nage to existing leachate collecEion system. Landfill gasconveyed from Phase I via gas transmission line to landfill gascontrol unit located south of future Phase 3. Transmission linecondensate gravity drains to 3 condensate sumps (s-4 to s-6).lref. Sp. Cond. #A.2.a13), Sheets C-03 & C-051
Gas processing system eas irnet from qas extraction system, knockout pot, 2 blowers,vertical candlestick flare unit. Condensate collected at knockdown pot, bJowers and flare drained via a 2" HDPE gravity drainline to condensate sump S-6 . [ref. Sp. Cond. #A.2.a.(3), Sheet C-06]
PERMITTEE: saragota county Solj.dl waste operatLons PERMIT No: 130542-OO9-SC/08Mr- Frank Coggl,ns, Manager CcsvlDC Phase x Gas collectj.on/contsrol syscem constructsLon
GENERAIJ COTiIDITIONS I
1. The terms, conditions, requirements, limitations and restrictions setforth in this permit, are "permit, conditions" and are binding and enforceablepursuant to Sect,ions 403 .t4L, 403 .l-61- , 403 .72'7 , or 403.851, Florida Statutes.The permittee is placed on notice that the Department will review this permitperiodically and may initiate enforcement action for any violation of theseconditions.
2. This permit is valid only for the specific processes and operationsapplied for and indicated in the approved drawings or exhibits. Anyunauthorized deviation from the approved drawings, exhibits, specifications,or conditions of this permit may constitute grounds for revocation andenforcement action by the Departmenc.
3. As provided in subsections 403.087(6) and 403.722(5\, F.S., the issuanceof this permit does not convey any vested rights or any exclusive privileges.Neither does it authorize any injury to public or private property or anyinvasion of rights, nor any infringement. of federal, State, or loca] Iaws orregulations. This permit is not a waiver of or approval of any otherDepartment permit that may be required for other aspect.s of the total projectwhich are not addressed in this permit.
4. This permit conveys no title to land or water, d.oes not constitute Staterecognition or acknowledgrment of tit.le, and does noL constitute authority forthe use of submerged lands unless herein provided and the necessary title orleasehol-d interests have been obtained from the state. Only the Trust.ees ofthe Internal ImprovemenL Trust Fund. may express State opinion as to tit1e.5- This permit does not re1ieve the permittee from liability for harm orinjury to human health or welfare, animal, or plant life, or pioperty causedby the const.ruction or operation of this permitted. source, or from penaltiestherefore; nor does it allow the permittee to cause pollution in contravenLionof F1orida St.atutes and Department rules, unless specifically authorized by anorder from the Department.
6. The permittee sha1l properly operat.e and maintain the facility andsystems of treatment and cont.rol (and related appurtenances) thac areinstaLled and used by the permit.tee to achieve compliance with the conditionsof this permit, are required by Department rules. This provision includes theoperation of backup or auxiliary facilities or similar systems when necessaryto achieve compliance with the conditions of the permit and when required byDepartment ru1es.
7. The permittee, by accepting this permit, specifically agrees to all-owauthorized Department personnel, upon presentation of cred.entials or otherdocuments as may be required by law and at reasonable times, access t.o thepremises where the permit.ted activity is located or cond.ucted. to:
(a) Have access to and copy any records that must be kept undercondit.ions of the permit;
(b) Inspect the facility, equipment, practices, or operationsregulated or required under this permit; and
(c) sample or monitor any substances or parameLers at any locatronreasonably necessary to assure compliance with this permit. or Depart,mentrules.
Reasonable time may depend on the nature of the concern beinoinvestigated.
Page 2 of 15
PERMTETEE: garasota ""Q
soltd vlaece operaeions t"rr No: 130542-ooe-sc/ogMr. Frank Coggins, Manager CCSWDC Phase I GaE CollectLon/control gysten Constnret,Lon
GEIIERAIJ CONDITIONS:
8. If, for any reason, the permittee does not comply with or will be unableto comply with any condition or limitation specified in this permit, thepermittee shall immediately provide the Department with the followinginformation:
(a) A description of and cause of noncompliance; and
(b) The period of noncompliance, including dates and timesi et, if notcorrected, the anticipated time the noncompliance is expected toconLinue, and steps being taken to reduce, eliminate, and preventrecurrence of the noncompliance.
The permittee shal1 be responsible for any and all damages which may resultand may be subject to enforcement action by the Department for penalLies orfor revocation of this permit.
In accepting this permit., Lhe permittee understands and agrees that allrecords, notes, monitoring data and other information relating to theconstruction or operation of this permitted source which are submitted to theDepartment may be used by the Department as evidence in any enforcement caseinvolving the permitted source arising under the Florida Statutes orDepartment ru1es, except where such use is prescribed by Sections 403.111 and403.73, F.S. Such evidence sha11 only be used to the extent it is consistentwith the Florida Rules of Civil Procedure and appropriate evidentiary ru1es.
10. The permittee agrees Lo comply with changes in Department rules andFlorida Statues after a reasonable time for compliance; provided, however, thepermitt,ee does not waive any other rights granted by Florida Statutes orDepartment rules.
l-1-. This permit is transferable only upon Department approval in accordancewith Rule 62-4.120 and 62-730.300, Florida AdminisLrative Code, as applicable.The permittee shaIl be liable for any non-compliance of the permitted activityuntil the transfer is approved by the Department.
L2. This permit or apermitted activity.
1-3. This permit also
copy thereof shall be kept at the work site of the
constitutes:
(a) Determination of Best Available Control Technolog-y (BACT)
(b) Determination of Prevention of SignificanL Deterioration (PSD)
(c) CerLification of compliance with state Water Quality Standards(Section 401, PL 92-500)
(d) Compliance with New Source Performance Standards
Page 3 of 15
PERMTTIEE: sarasota ""J""ridl waEte operaLions "tr No: 130542-009-sc./ogMr. Fratrk Cogg:lns' Manager ccswDc Phase I Gas CollectLon/Control system conEtructsLon
GENERAIJ CONDITIONS:
L4. The permittee shall comply with the following:(a) Upon request, the permittee shall furnish all records and plansrequired under Depariment ru1es. During enforcemenl actions, theretention period for all records will be extended automatically unlessotherwise st.ipulat.ed by the Department.
(b) The permittee shall hold at the faciliLy or other locationdesignated by this permit records of all monitoring informat,ion(including all calibration and maintenance records and all originalstrip chart recordings for continuous monitoring instrumentation)required by the permit, copies of all reports required by this permit,and records of all- data used to complete the application for thispermit. These materials shall be ret.ained at least three years from thedate of the sample, measuremenL, report, or application unless otherwisespecified by Department rule
(c) Records of monitoring information shal1 include:
1. the date, exact p1ace, and time of samplingf or measurements;2. the person responsible for performing the sampling or
measuremenE.s,.3. the dates analyses were performed;4- the person responsibLe for performing the analyses;5. the analytical techniques or meLhods used;5. the results of such analyses.
15. when requested by the Department, the permiLtee sha11 within areasonable time furnish any information required by law which is need.ed. todetermine compliance with the permit. rf the permitt.ee becomes aware therelevant facts were not submitEed or were incorrect in t.he permit applicationor in any report to the Department., such facts or information sha1l becorrected promptly.
Page 4 of 15
PERltrrrEE: sarasota ""l;
solld wagre operaEionB p'lFr.rrr No: 130542-oo9-sc/08![r. Frank Coggins, Manager CCSWDC Phase I cas Cotlection/Control SyFtem Coastruetion
SPECIFIC CONDITxONS: PART A -Solid, Waste Facility General Requirements
1. Facility Desigmatj.on. This gas control system is designed to recovercombustible gas and shall be constructed, operated, closed, monitored andmaintained in accordance with all applicable requirements of Chapters 62-4,62-302, 62-330, 62-520, 62-522, 62-550, and 62-701", Florida AdministrativeCode (F.A.C.) and all applicable reguirements of Department rules.
2. P€mit Application Documentalion. This permit is valid for constnrctionof a gas collection and control system for existing Central County Solid WasteDisposal Complex (CCSWDC), Class I Landfill (Phase I), in accordance with allapplicable requirements of Department rules and in accordance with thereports, plans and other information prepared by HDR Engineering, Inc. (unlessotherwise specified) as follows:
a. Central County Solid Waste Disposal- Complex Class I L?ndfill ?haseI Gas
i 29, 2008 (receivedDecember 30, 2OO8l, as revised, replaced or amended (informationcollated into originals*) dated March 13, 2009 (received March 26, 2009)and dated April 20, 2OO9 (received April- 22, 2009). This informationincludes, but is not limited to:
1) Section 2 - Engineering RePorti
2) Section 4 - Specifications; and
3) PIan Sheets titled, Permit Drawings for Central County SolidWaste Disposal Complex, Sarasota County Phase I Gas Collection andControl Systern.. (17 Sheets) signed and sealed April 20, 2009(received April- 22, 2009).
Permit Modifications.a. Any const.ruction, operation or other activities not previouslyapproved as part of this permit sha11 reguire a separate Departmentpermit unless the Department determines a permit modification to be moreappropriate, or unless otherwise approved in writing by the Department.Any significant changes to the construction or operation at the facilitysha11 require a permit modification. Permits shal1 be modified inaccordance with the requirements of Rule 62-4.080, F.A.C. A modificationwhich is reasonably expecLed to lead t.o substantially differentenvironmental impacts which require a detailed review by the Departmentis considered a substantial modification.
b. This permit authorizes the construction of the Phase I gascollection and conLrol system and other re]ated appurtenances, onl-y.
4. Permit Renewal. On or before ilanuary 1, 2014 the permittee sha1l nobifythe Department in writing or elecLronically of its intent to apply for renewalof this permit and of the anticipated date of submittal of Lhe permit renewaLapplication. No later than May 1, 2OL4, the permittee shal1 apply for arenewal of a permit on forms and in a manner prescribed by the Department, inorder to assure conformance with all applicable Department rules. Permitsshal-l- be renewed at least every five years as required by Rule 62-4.090,F.A.C. and Rule 62-70L.320 (10) (b), F.A.C. fn the event that the regulationsgoverning this permitted construction are revised, the permit renewal shal1include modification of those specific consLruction conditions which areaffected by the revision of regulations to incorporaLe those revisions inaccordance with Specific Condition A.8.
* Eee ocul,us for un-collated submittals
Page 5 of L5
pER![rrrEE: sarasora ""P sorid wa6ue operations PERldIr NO: 1305112-009-SC/08
Mr. Frank Cogg:lns, Manager ccswDc Phase I Gas Collection/Control system construccioa
SPECIFXC CONDTTIONS: PART A -Solid Waste Fasility General Requirerments
5. Professional certification. where required by chapter 47L (p.E.) orchapter 492 (P.G.), Florida statutes, applicable portions of permiLapplications and supporting documents which are submitt.ed. to lh" D"p.rtmentfor public record shaLl be signed and sealed by the professional(s) whoprepared or approved them.
6. General ConditLons. The permittee shal1 be aware of and operate und.erthe "General- Conditions. " General Cond.itions are binding upon the permitteeand enforceable pursuant to chapter 403, Florida statutes.7. Permit Acceptance. By acceptance of this permit, the permitteecertifies that he/she has read and understands the obligations imposed by theSpecific and General Conditions contained herein and also including date ofpermit expiration and renewal dead.lines. It is a violation of this permit forfailure to comply with all conditions and deadlines.
8. Regrulations. chapter 62-70L, F.A.c. , ef fective NIay 27, 2001, isincorporated into this permit. by reference. In the event that the regulationsgoverning this permitted operation are revised, the Department shal1 notifythe permittee, and the permittee shall request modification of those speciticconditions which are affected by the revision of regulations to incorporatethose revisions.
I Prohibitions. The prohibitions of Rure 62-70L.300, F.A.c., shall not beviolated by the activities at this facilitv.
d- rn the event that limestone is encountered during excavation orconstruction activities, the excavation/construction activities shallcease and the Department shal1 be notified within 24 hourE of d,iscovery.writt.en notification sha11 be submitted within z d,ays of discowery. Thewritten notification shatl includ.e the location, elevation, and extentof limestone noted on a plan sheet, a description of the materiarsencountered, and a plan of action which ensures that groundwater will-not be adversely affected by the continued construction and operation ofthe facility. Excavation or const.ruction activities shalt nol resume inthe affected area until the Department-approved plan of action has beencompleted.
b. In the event thaL surface depressions or other occurrences whichmay be indicative of sinkhole activity or subsurface instability, arediscovered on-site, or within 500 feet. of the site, the Departm-nt shallbe notified in accordance wiLh Specific Condition #c.6.b. The writtennotification shal1 include a d.escription of t.he incident, the locationand size of the affected area shown on an appropriate plan sheet, and. acorrective action plan which describes the actions necessary E,o preventthe unimpeded. discharge of waste or ]eachate into ground or surfacewater.
c. Open burning of solid waste is prohibit.ed except in accordancewith Rule 62-101.300(3) and chapt.er 62-256, F.A.C. A11 fires whichrequire longer than one (1) hour to extinguish must be prompt.ly reportedto the Department in accordance with specific condition #c.6.b.
Page 5 of 15
PERIrIITTEE: Sarasota ""OMr. Frarrk Coggins, llanager
trr No: 1305d2-ooe-sc/08
SPECIFIC COIIDfTIONS: PARI B - Constnrction Requirements
Solid waEte OperationgeCSIfDc Phase f cas Collectl.on/Cont,rol System Constnrctsion
significant construction activities sha1l be approvedto initiating work, unless specifically authorized
1. Construction. Allby the Department priorotherwise.
a. This permit authorizes the consuruction of the gas coflection andcontrol system for Phase I of the Class I landfill and relatedappurtenances only.
2. Certification of Construction Completion. All information required bythis Specific Condition sha11 be signed and sealed by a registeredprofessional engineer or land surveyor as appropriate.
a. Within sixty (60) dlays afLer the specified construcLion has beencompleted, the following activities shal-l be completed and submitted bythe permittee for Department approval. Operation of the constructedsystems, structures, equipment, etc., shall not be initiated prior toDepartment approval of the information required by this SpecificCondition:
1) The owner or operator shal1 submiL a Certification ofConstruction CompleLion, Form 62-701.900(2), signed and sealed bythe professional engineer in charge of consLruction and qualityassurance to the DepartnenE for approval, and sha11 arrange forDepartment representatives to inspect the construction in thecompany of the permittee, the engineer, and the facility operator.
2t The owner or operator shall submit Record Drawings,/DocumenLsshowing all changes (i.e., alf additions, deletions, revisions to
. the plans previously approved by the Department including sitegrades and elevations). The Record Documents shall include, butnot be limited, to as-bui]t, p1ans, delails and elevations(survey) .
3 ) The owner or operator sha11 submit a narrative indicatingaI1 changes in p1ans, the cause of the deviations, andcertification of the Record Drawings/Documents by the Engineer Eothe Department.
4l The professional engineer of record sha11 submit to theDepartment a final report, to verify conformance with the plans andspecificaLions in accordance with Rules 62-70L.400(7) and (8),F.A.C.
3. Record, Drawings/Doquments. The Record Drawings/Documents sha11 include,but not be limited to, the foll-owing informaEion:
a. As-bui1t survey of location and elevations along landfi11 gasheader and transmission lines and condensate discharge lines and drainpipes [ref. Spec 02221-3.9.4.];
b. Ground surface elevations and well depths for each of theextraction well-s and horizontal collector vertical borings listed on the"We1l Schedule" identified on Sheet D-01 of the Construction Drawings[ref. Sp. Cond. #A.2.a.(3)];
c. Copies of photographs documenting all stages of the constructionnrd.i 6df -YrvJvve/
Page 7 of 15
PERMITTEE: Sarasoua County Solld, Waste Operat:lons PERIi|IT NO: 1305r[2-OO9-SC/OBMr. Frank Coggins, Maaager CCswDC Phe8e I Gas Collection/Control Sysuea Coaslructlon
SPECIFIC COIIDITIONSI PART B - Construction Requirements
4. Pre-Construction Meeting Notification. Department Solid WastePermitting staff shall be notified. at least one (1) week prior to a1l pre-construction meetings. Prior to initiating construction activities, thepermittee shal1 make arrangements for the Engineer of Record to meet on siteand. discuss all plan changes with Department Sol-id Waste PermiLLing Staff. Acopy of the minutes from the pre-construction conference sha1l be submitted tothe Department within two (2) weeks of the conference.
5. eonstruction Sched.ule and progress Relrort.a. The Engineer of Record or another qualified professional- engineershall make periodic inspections during construction to ensure thatdesign integrity is maintained.
b. An updated construction schedule and progress report shall besubmitted to the Department monthly, by the 15rb of each month. Th;monthly progress report should be submitted electronically in PDF formator in an appropriately labeled three-ring binder of sufficient size tostore the monthly progress reports for the entire project. The monthlyprogress reports shall include, but not be l_imited to:
l-) A narrat.ive explainj-ng the status (and any delays) of majorstages of the construction;
2) A summary of submittals and change order requests;
3) Weekly progress meeting minutes; and
4) Color copies of photographs, which are representative of thetlpical construction activities for the reporting period, andwhich show overall views and details of major stages ofconstruction. If digit.al photographs are taken, a CD-Romcontaining the photographs may be submit.ted in lieu of printedcopies
6. Construstion Toleranc€s. Invert elevations of the landfill gascollection and control pipes shall- be recorded at a frequency sufficient todemonstrat.e t.hat the headers and laterals have been constructed to t.he slopesand grades shown on the drawings and will drain adequately. This informationsha1l be included with the Record DocumenLs.
7. Laboratory and Field Testing Requirements. Field and laboratory test.ingduring the consLruction activit.ies shall be conduct.ed. bv a cruafified testinolaboratory.
8. Constnrction QuaLity Assurance.a. A complete set of construction drawings and shop drawings, whichinclude daily addit.ions, d.eletions and revisions, shal1 be maintainedon-sit.e at all times for reference.
b. Leachat.e or gas condensate shaLl not be deposited, injected,dumped, spilred, ]eaked, or discharged in any manner to the 1and,surface water or ground.water at any time during the constructionactivities _
c. Unsatisfactory, defective or non-conforming work shall be reportedto the Engineer and shall be corrected, or the reasons for notcorrecting the work shall be recorded. and maintained onsite forreference and inspections. Documentation of the corrections or reasonsfor not correcting the work shal-l be submitted with the Record Documentsrequired by Specific Conditions #8.3.
Page 8 of 15
oCounty
![anegerPERIITTEE! SarasolaDlr. Frank Coggiae,
Solidl Wagle Operations PERIIIT NO: 130542-009-SC/08ccswDc Phase I Gas Collection/Control system construction
SPECIFIC COIIDITIONS; PARI B - Construction Requirernents
(Specific Condition #B.8., cont,d)d. Excavated refuse shal-l be foaded and transported to the Class Ilandfill working face by the end of each working day. No refuse shallbe allowed to remain uncovered overnight. The refuse must be removedimmediately during any rain event to prevent stormwater from contactingthe refuse. [ref. Spec 02221-3.3 A. & B.]
e. The non-perforated PVC laterals, leachate and condensate drainlines, connections to LFG'header, and air supply lines, shall besubjected to pressure tests to detect any leaks in the piping. [ref. Spec
15060-3.41
f. Al-1 dewatering liquids shal1 be managed as leachate.
Page 9 of 15
PERITITTEE! Sarasota CountyMr. Frank Coggins, Maaager
Solidl WaEUe Operat:Lons PERllMo : 13 05112 -0 09 -SC/08CCSWDC Phase I Ga6 Collection/Contro1 Systern Coastliretion
SPECIFfC COIIDIIIIONS: pART C - Operation Reqtrirements
L. Facility Operation Requirements.a. The permitt,ee shall operat,e this facility in accordance withChapter 62-701, F.A.C., and Operati_on permit No. L30542-007-SO-01,(including modifications, if any), or its successors.
b. This permit does not authorize the operation of the Phase I qasco1lectionandcon@"''"]-...oappurtenanceSuntiithefollowing requirements have been compleLed and submitted by thePermittee, and approved by the Department:
L) Certification of Construction Completion requirements ofSpecific Conditions #B. 2 . and #B. 3 . ,
2) Issuance of a permit modification of Operation Permit No.L30542-007-SO-0j- or its successor, which authorizes operation ofthe Iandfill gas cotlection and control system and it,s relatedappurtenances.
The permittee may temporarily operate the constructed system for up to1-80 days to allow for system sLart-up and operational adjustments whilethe certification of construction completion submittals and approvalsrequired by this specific condition are completed. The permit shal1notify the Department electronically or in writing of Lhe start date for. temporary start-up operation of t.he system.
c. Leachate and/or gas condensate shall- not be deposited, injected.,dumped, spilled, leaked, or discharged in any manner co soi1s, surfacewater or groundwater outside the Iiner and leachate management systemsat any time during the construction or operat.ion of this facility.
2- Facility Personnel. The owner or operator sha1l provide adequatepersonnel for constructing, operating, monitoring and maint.aining the facilityin an orderly, safe, and sanitary manner.
3. Control of AcceEs. Access to, and use of, the facility shall becontrolled as required by Ru]e 62-701.500(5), F.A.C.
4. Monitoring of Waste. Wastes shalL be monitored as required by OperationPermit No. 130542-007-so-01, (including modifications, if any), or itssuccessors.
5. Control of Mrisance Cond.itions. The owner or operator sha1l controlodors, vectors (mosquitoes, other insects, rodents), and fugitive particulates(dust, smoke) arising from the construct,ion and operation so as to protect thepublic health and welfare. Such control sha11 minimize the creation ofnuisance conditions on adjoining property. Odors observed. by Departmentpersonnel upon site inspection, shal1 constit.ute a nuisance condition, and thepermittee must take immediate corrective action to abate the nuisance.
Page L0 of 15
PERMTTtrEE3 sarasosa ""rf;!!r. Frank Cogrg:Lns, Manag€r "Qrr No: 13o5rt2-ooe-sc/08Soltdl lfaste operationg
CCswDc Phase I eas Collection/Control SyEteE Conat:irction
SPECIFIC COIIDITIONS: PART C - Operation Requirernents
FacLJ.ity Maintenance and, Repair.a. The siue shall be properly maintained including maintenance ofaccess roads to disposal areas, equipment, stormwater and leachatemanagement systems, cover systems and berms, 9ds monitoring andmanagement systems, surface water moniLoring system, and groundwatermonitoring system. Erosion and ponded water in disposal areas sha1l beprevented.
la In Lhe event of damage to any portion of the landfill sitefacilities, unauthorized. leachate discharges, failure of any portion ofthe landfiIl systems (includinq damaged or dry groundwater monitoringwells), fire, explosion, the development of sinkhole(s) or othersubsurface instabil-ity at lhe site, the permittee shall imediabely(within 24 hours) notify the Department explaining such occurrence andremedial measures Lo be taken, method to prevent reoccurrence, and timeneeded for repairs. Wrilten, detailed notifiqation shall be submittedto the DeDartment within seven (7) days following the occunence.Routine maintenance does noL recruire notification but shal1 be noted ondaily reports.
7. Storm!,fat€r Manragem€nt. The site shall have a surface water managementsystem designed, constructed, operated, and maintained to prevent surfacewater from running on eo waste filled areas, and a stormwater runoff controlsystem designed, constructed, operated, and maintained to collect and controlstormwater to meet the requirements of Chapter 62-330, F.A.C., and therequirements for managiement and storage of surface water in accordance withRule 62-?0L.500(10), F.A.C., to meet applicable standards of Chapters 62-3,62-302, and 62-330, F.A.C. The stormwater management system shaL1 beinspected for damage and proper operation daily.
Page 11 of 15
PERMITTEE:!dr. Frank
SolLd WaEt€ OperalLons PERMIT NO: 130542-009-SC/08Coggins, Manager CCSWDC Ph.ase I Gas Collection/Control Sygt€m Construction
SPECIFIC COIIDITIONS: PART D - Record.keeoina
1-. Report subnrittars. unless otherwise specified, all submittals,notifications, requests for permit modification, reports for compliance withthis permit, etc., sharl be sent to: solid waste section, Department ofEnvironmenta] protection, Southwest District office, j-305j_ North TelecomParkway, Temple Terrace, Florida 33637-0926.
2. Operation Plan and Operating Record. Each ]andfill owner or operatorsha1l have an operat,ional plan which meets the reguirements of Rule 62-701.500(2), F.A.c. A copy of the Department approved permit, operationarplan, construction reports and record drawings, and supporting informaLionshal-I be kept at the facility at all times for reference and inspections.operating records as required by Rule 62-701.500(3), F.A.c., are part of theoperations p1an, and sha11 also be maintained at the site.
3. Waste Record,s. The permit.tee sha11 maintain all records required by theconstruction specifications, and this permit on-site, and shall- provide copiesto the Department upon request, unless specified otherwise.
4. Financial Assurance. The permittee shall provide adequate financialassurance for this facility and related appurtenances in accordance with Rule62-701-.630, F.A.c. and operat.ion Permit No. l-30542-007-so-01- (includingmodifications, if any), or its successors.
SPECIFIC COIIDITIONS: PART E - Water Qualitrr Monitorincr RecnrirementE
l-. Water Quality Monitoring Quality Assurance. WaLer quality monit.oringsha11 be conducted as required by operat.ion Permit No. 130542-007-so-01(including modifications, if any), or its successors.
Page 12 of, 15
pERllrrrEE! sarasoua ""n
sotid wasre operations "trt No: 1305r12-oo9-sc/08
Dtr. Frank Coggins, llanager CCSI{DC phase I cas Colleceion/Control Sysuem Congtruction
SPECIFIC COIIDITIONS: PART F - Landfill Gas Managenent
1-. Landfill Gas - NSPS and Title V Air Requirements.a. This solid waste permit will- meeE the statutory requirement toobtain an air construction permit before modifying or constructing asource of air pollution, except for those landfills that are subject tothe prevention of significant deterioration (PSD) requirements ofChapter 62-2L2, F.A.C. Facilities that are subject to the PSDrequirements sha1I obeain an air construction permit from the Bureau ofAir Regulation prior to beginning construction or modification pursuantto Rule 62-21,0.400, F.A.C
b. The permittee shal1 comply with any applicable Title V airoperation permit application requirements of Chapter 62-21-3, F.A.C., and40 CFR 60, Subparts WWW and CC, as adopted by reference at Rufe 52-204.800, F.A.C. Title V permit applications shall be submitted to theDistrict Air Program Administrator or County Air Program Administratorwith air permitting authority for the landfill.
The permittee sha1l submit to the Division of Air ResourcesManagement, Department of Environmental Protection, Mail Station 5500,3900 Commonwealth Blvd., Tallahassee' FL 32399-3000, any amended designcapacity report and any Non-Methane Organic Compound (NMOC) emissionrate report, as applicable, pursuant to 40 CFR 60.757(a)(3) and (b).
2. Gas Monitoring and Control.a. Landfill gas shall be monitored to demonstrate compliance with thecriteria established in Rule 62-701.530(1) (a), F-A.c. (1ess than 25t ofthe lower explosive limit (LEL) for combustible gases in strucLures andless than L00t of the LEL for combustible gases at or beyond theproperty boundary).
b. The owner or operaror shalt control- 1andfi11 gas after theshutd.own of the active landfilt gas collection system (i.e., gas is nolonger routed to the boiLer or the flare). fn Lhe event that a passivegas vent,ing system is required the owner or operator shalf submit anapplication for minor permit modification to authorize itscons truction/ operat ion .
3. Gas Monitoring Locations. Landfi1l gas moni-toring shal1 be conducted asrequired by operation Permit No. 130542-007-so-0L (including modifications, ifany) , or its successors.
4. Gas Remed,iation. In the event Lhat the Lower Explosive Limit (LEL) isgreater than 25% inside structures both on and off of the landfill site, orgreater than 1008 at the property boundary, the owner shaIl submit to theDepartment, within ? days of detection, a remediation plan detailing thenature and extent of the problem and the proposed remedy. The remedy shall becomplet.ed within 60 days of detection unless otherwise approved by theDepartment.
Page 13 of 15
PERITTIIIEE: saraaota county Solid. wagte oEerat,ionE PERI.|IT No: 1305r12-OO9-Sc/0gMr. Frank Coggins' Manager ccsvfDc PhaEe I Gas Collection/Contro1 syEt€m const,ruct:lon
SPECfFIC COIIDITIONS: PART G - Closure and Long-Term Care Reguirenents
1. Closure Permit Requirements. No later than ninety (90) d,ays prior tothe date when wastes will no longer be accepted. for portions of the landfillwhich have reached closure design dimensioni, the tandfill owner or operacorshal1 submit a closure permit application to the Department, in ord.er toassure conformance with all applicable Department ru1es. A closure permit isrequired. prior to implementing closure related activities.2- Final' Cover. Portions of the landfill which have been filled with wasteto the extent of designed d.imensions shall be closed (shalt receive finalcover) within 180 days after reaching design dimensions, in accordance withRule 62-701-500(7) (s), F.A.c. and. all applicable requirements of Departmentrules.
Long-Term Care Requirements.a. The owner or operator shall perform long-term care for the site inaccordance with Rure 62-701.620, F.A.c., and the conditions of operationPermit No. 1-30542-007-so-01 (including modifications, if any), or itssuccessors.
b. Long-term care includes, but is not limj-ted to, water quality,Leachate and gas monitoring, maintenance of the final cover system,maintenance of the leachate collection and removal system, erosioncontrol-, and the prevention of ponding within disposal areas.
4. Use of Closed, Landfill Areas. Prior to irnplementation, the owner oroperator shall submit a plan for any proposed uses of the closed portions ofthe landfill to the Department for approval. This plan shal1 includ.e adescription of the proposed. use and evaluation of the impact on the exist.inglandfill- systems (e.g. final cover, leachate collect.ion, bott.om liner) ,engineering designs, calculations and plans as appropriate, etc. The proposedactivity shal1 not be initiated without prior Department approval, and mayrequire a permit modification or separate permit.
Executed in Hillsborough County, Florida.
STATE OF FLORIDA DEPARTMENTOF ENVTRONMENTAL PROTECTION
District DirectorSouthwest. District
Fage 14 of 15
trr No: 1305{2-ooe-sc/08Mr. Frank Cogg:Lns, llanager CCSWDC Phase I cas CollecELon/Conurol SyEt€D ConstruccLon
ATTACHMEIIT 1
SPECIFTCCOIIDITION
SUBMITTAI. DUE DATE REQUIRED ITEM
A.4 No later than ,January L,20L4
No later than May 1, 20L4
Notification of date ofpermit renewalapplication submittal
Submit application forpermit. renewal
A.9.a.discovery
Within 7 days of verbalnotification
hi Notification of sinkholesor subsurface instability
Written notification &
corrective action plan
B.2 . a. Vrlithin 60 days ofcompletion
Submit certification ofcons truction completion,record drawinqs, etc.
8.4. 1 l_l5 I ^^aL6L IEd>L we pr or
No later than 2 week afterpre-construction meeting
ek Notify of preconstructionmeeting
Submit meeting minutes
B. 5. b. Monthly, by the 15"'eachmonth
Submit monthly progressreport & schedule
c.6.b. Within 24 hours ofdiscovery
Within 7 days of verbalnoti fication
Notif icati-on of :
sinkholes, failure ofIandfill systems orequipment., etc.
Written notification &
corrective action plan
Page 15 of 15
ntllrg"n, Steve
From:Sent:to:Cc:Subject:Attachments:
Barker, Ashley V. [Ashley.Barker@ hdrinc.com]Wednesday, July 01, 2009 10:05 AMMorgan, Stevebtavares @scgov.net; Lebron, CarloSarasota CCSWDC - Proof of Publication2266_001.pdf
Good morning Steve,
The Sarasota Central County Solid Waste Disposal Complex has published the Notice of ProposedAgency Action on Permit Application. Attached is a copy the Affidavit of Publication for the 6/23109publication.
Thank you,
Ashley Barker, EI, LEED@ APProject Engineer
HDR Engineering, Inc.ONE COMPANY I Many Solutions200 West Forsyth Street I Suite 800Jacksonville, FL | 32202-4321Phone: (904) 598-8941 | Fax: (904) 598-8988
*A Think Green - Plea$e do not print this e-mail unlcs$ necessary
AFFIDAVIT OF PUBLICATIONSARASOTA IMRALD.TRIBT]Nf,
PUBLISHED DAILYSARASOTA, SARASOTA COUNTY' FLORIDA
STATE OF FLORIDACOUNTY OF SARASOTA
BEFORE TT{E LTNDERSIGNED AUT}IORITY PERSONALLY APPEARED SHARI BRICKLEY, WHO ON OATH
SAID SHE IS CLASSIFIED DIRECTOR OF ADVERTISING FOR TTIE SARASOTA HERALD-TRIBUNE, ADAILY NEWSPAPER PUBLISHED AT SARASOTA, IN SARASOTA COT]NTY FLORIDA; AND CIRCULATED
IN SARASOTA COUNTY DAILY; THAT TI{E ATTACHED COPY OF ADVERTISEMENT BEINC A NOTICE INTHEMATTEROF:
Legal description documented below:
INTHE COURT WAS PUBLISHEDIN THE SARASOTAEDITION OF SAIDNEWSPAPERIN TTIE
ISSUES OF:
6/23 Ix
AFFIANT FURTHER SAYS TTIAT TI]E SAID SARASOTA HERALD.TRIBI.'NE IS A NEWSPAPER PUBLISTIED
AT SARASOTA, IN SAID SARASOTA COUNTY, FLORIDA, AND THAT THE SAID NEWSPAPER HAS
THERETOFORE BEEN CONTINUOUSLY PUBLISHED IN SAID SARASOTA COT]NTY, FLORIDA, EACH DAY,AND HAS BEEN ENTERED AS SECOND CLASS MAIL MATTER AT T}IE POST OFFICE IN SARASOTA, INSAID SARASOTA COI.,NTY, FLORIDA, FOR A PERIOD OF ONE YEARNEXT PRECEDING T}IE FIRST
PUBLICATION OF THEATTACHED COPYOF ADVERTISEMENT; AND AFFIANT FI.,RTHER SAYS THAT
SHEHASNEITIIERPAIDNORPROMISEDANY PERSON, FIRM ORCORPORATION ANYDISCOUNT,REBATE, COMMISSION OR REFUND FOR THE PURPOSE OF SECI'RING THIS ADVERTISEMENT FOR
PUBLICATION IN THE SAID NEWSPAPER.
SIGNED
.--j
fui€^efr^rcswoRN ORAFFTRMED TO, AND SUBSCRTBED BEFORE rvrs THISZI-5AY OF Jur-<.- , A.D.,20!1
BY SHARI BRICKLEY WHO IS PERSONALLY KNOWN TO ME.
SHABOH T. TURNER
t{otary Public . $t|to of tlorida
My Comm. Explrcs APt 18, 2013
commldslon # 0D 874074
Sonded Throuoh Nelional ilotuy Atm.
srab ofFloddaDepsrim€I|t of Ewironmsnldl Probclion
Ndlce of PropossdAgency Adion onPemitApplicdm
Th6 Dood|Inenl qivos notice of its Inlontto issue a D€mlI (Flls No. 130542409-SC/08) b Sarasoia Courw Solid WastsOpentions, who applied dr Oecember30, 2008 b lho C)€partrnoni olEnvironmsntal Prol€c1ion lor a p€fmit toconsfiuct a landfi{ oa8 collection andconrol €v6tsm u Fh-a86 | of an o&tingCls I landfill. r€l€fid to as the CenlralCoudy solid Wasto Disposal Compte&subject to ttF specific and generalconditidrs attacfEd, located at the northsnd of Knlghts Trsil Road, 2 miles sast ofl-its. northaast of Venice. SatasolaCounty, Rorlcb.
Percons whoss subslantial intqests argaltected by the Departmsril's proposedDemitino dsdsbn mav oetition lor anadmhisiAtvo proceedfnd Osaring) haccordmG with S€clion 120.57. FloridaSlat|lles. Tho oelition must contain thalnbrma$on sst lorlh below. and must befilod (recotvsd) in lhe Ofica of G6ne{alcounsol of the DsDaflmont at 3900Commonwealth Boule\rard, Mail Stefon35, Tdhhasse€, Florida 3239&3m0,withln bunsn (14) days ot publicafion otthis noti€. A copy ot lh€ polilion mu$also bE mdlsd at lho lima ot flling to thseDDlicant d the addr€ss hdicabd.Firilurs io fls a reqrssl for hsaring wtrhlnthis time pedod sf|all constitJte e wdvsrany rioht sjch pdson may have tormu6t m admlnistrdivs dstomlnation(hearing) und6r Secrion 120.57, FloidaStalutas. Msdiaddl is not a\iailablo in thisPlocosding.
Tho pedthn sfiall srtsin the lollowinginfomdion; (a) Tha name, addrsss, andlelephorE numbsr of eacfi p€tition€r, thsaDolicant's name sd addross, th€hartm6nt Pormit Filo ffumber qnd lhe6mty in whicfi ths prolec{ is propos€d:(b) A stalement of how and wh€n escflodtoner rscdvsd noti@ otDopartment's actlon, or propossd acdon:(c) A ststdnent ot how oach petilionar'sstbstfftd intorosts are affecied by thoD€panrn€nt's aclion or proposod action:(d) A siatement of th€ mateial lactsdispr.isd by Petitiorcr, lf any (0) Astalomerl| of facls which Dolitionercontendg wanert revoFd or modificalionof the Depanrnenfs aclion or propossdaction; and (t) A sblomern of wtich rulsstr stafutgg pelilhnof conttrds rsqlirereveFal or modilicalori of lhsDepartmoff's aclion or Hopos€d dim:ard (g) A stal€ment ot lhe rsliat sougltlby p€tilion€r, staling preds€ly lhe acllonpetitionar wants the Dspartment b bkewith respect to ths Department's aclionor proposad aclion.
lf a petilion is filed, lho adminlslr€tiv€haarlng procsss is dosigned lo tormdaleaq€ncy action. Affirdingv, moDeDartment's fnal aclion may bgdlterent lrom the position tat(en by it inthis nolic€. Persons whosg substantialintorsts will be atbcled by any dscislonof ths Depa'tT€nt with rsgard to ths@plication ha\E |hg light to patltlon tobscome a party to lh€ plooeeding. Thepotition musl contorm !o lherffruirements sp€cified abovs and bofil€d (recoiwd) within 14 days ofDublication of ltis nolico in the Otfice ofGensrd couns€l al lhs abo\€ address olthe Dgpartmont
Failurs to Detton within lho allowsd timefiam6 constfiJrss a waiwr of any rlghtsuch petson has b roquest a hosringundsr g€cllon 120.57. Florida Statutas,and to participsto as a party to thisproceeding. Any subsaqusnt intervontionwill orw b€ al ths appro\ral of lheorssidlno officar r.pon mouon f l€dbursuant- to Rdo
'2&5.207. Florida
Adminislrative Code.
Tho applications aro a\railsle for publicircp€ction durlng normal businoss hours,8:00 a.m. to 5:m p.m., Monday throughFdday, o(cept legal holldays, at 13051Nonh Tdscdn Pallflay, Tomple Torrace,Florida336gm926.Dats of pub: June 23, 2qx,
Brantlev. Anna
From:Sent:To:
Cc:Subject:
Attachments:
Brantley, AnnaThursdaS June 18,2009 8:46 AMTedder, Richard; Hornbrook, Frank; Morris, John R.; Moore, Ronni;Commissioner Carolyn Mason; Commissioner Joe Barbetta; CommissionerJon Thaxton; Commissioner Nora Patterson; Commissioner Shannon Staub;County Adminishator Jim Ley; Representative Darryl E. Rouson;Representative Doug Holder; Representative Keith Fitzgerald; RepresentativeKenneth Roberson; Representative Ron Reagan; Senator Michael Bennett;SenatorNancy DetertPelz, Susan; Morgan, SteveSarasota CCSWDC Phase I Gas Collection and Control System 130542-009-SC-08 intent to issue * issued 6-18-2009.pdf - Adobe Acrobat ProfessionalSarasota CCSWDC Phase I Gas Collection and Control System 130542-009-SC-08 intentto issue - issued 6'18-2009
Please find attached electronic copy of the Intent to lssue of Permit to Sarasota County for the CentralCounty Solid Waste Disposal Complex- Permit #130542-009-SC/08 issued and mailed June 18, 2@9.
Anna
Anna BrantleyAd mi nistrative Assrslant //FL DEP / SWD / Waste Managnent13051 North Telecom ParkwayTemple Tenace FL 33637-0629Tel: 813/632-7600, Ext. 377Fax: 813/632-76eA
an n a. b rantlev@ de p. stq|9.f\. u s
MemorandumFlorida Department of
Environmental Protection
Yl ,//tt t' // //c''t'.//\- [ { t
PERMIT 130542-009-SC/08COUNTY : Sarasota
TO: x Deborah A.
DATE: June 11, 2409
FILE NAME: Sarasota CCSWDC Phase I Gas Coflectionand Control System Construction
PROGRAM : Solid Waste
TYPE OF PERMII ACTION: INTENT TO ISSUE PERMIT
PERMIT SUMI'IARY: This permit application is for construction of a fandfifl gascol-fection and control- system for Phase I of the existing Sarasota CCSWDC CfassLandfiff.
PROFESSIONAI RECOMMENDATION: X APPRO\ZE DENY
EVAIUATION SUMI4ARY: The applicant has provided sufficient i-nformation todemonscrate compliance with Deparcment rules to affow issuance of the permit.
TIH= 153,' TTP=108 (to O6/Ll/O9l TTPAnnl i n:J- i an rant d L2/30/08RAI #1 sent 0r/29/09 30RAI #1 response rec'd 03/26/09Supplemental- information rec/ d 04/22/49Application comolete 03/26/49Intent to fssue routed for siqnature a6/Lr/49 1B
DAY 90/30 FoR rHIs AcrIoN IS' D"L-99_:_!!:3S
ER.OM/THROUGH:Wi-l]-iam Kutash
LVLL'
Steve Morqan
E}WIRONMENTAI ADMINISTRATOR
i SoLID wAsTE I{ANAGER . I I -'solrD wAsrE PERMrrrrNr/l 4lul01I
CERTIFICATION
Application # 1 30542-009-SC/08. Sarasota County
Sarasota Central County Solid Waste Disposal Facility-Phase I landfill gas extraction system
I hereby certify that the engineering features described in the above-referenced
application provide reasonable assurance of compliance with applicable provisions of
Chapter 403, Florida Statutes, and Chapters 62-70T, Florida Administrative Code.
However, I have not evaluated and I do not certify aspects of the proposal outside my
area of expertise (including but not limited to the electrical, mechanical and structural
features).
//t:1rr /"t
,
dateSusan J. Pelz, P.E.
PE#50835
o
PostmalkHere
rrJI--nr!mE'Eo!
mEEE
Lnf{Ectrr:1Er!
Postage
Certlfied Fs€
Relurn RecelDt Fee(Endorsoment Re{ulred)
u 4 {-cq
Sarasota Countyc/o Mr. Frank CogginsLandfill Manager4000 Knights Trail RoadNokomis, FL 34275
f**,t*t fi Tss",. /r.t'm.
2. Article Number(Transfer lrcm s€,rvic€ laful)
Restricted Deliverv FeeIf (EndorsamentReqiired)
Total Po,
ilfr-ir,Ziior PO Bo,
Sbt6
r Complete items 1l 2, and 3, Also completeitem 4 if Res'tricted Delivery is desired.
I Print your name and address on the reverseso that we can return the card to you.
r Attach this card to the back ol the mailpiece,or on the front if space pennits.
'1. Article Address€d to:
Sarasota Countycio Mr. Frank CogginsLandfill Manager4000 Knights Trail Road
Nokomis. FL 34275
9'(3 'Je o3a 4. R€sfilct€d Delivery? (ExtraFe,) E Yes
A. Signatureu AgentE Addresee
C. Date of Delivery
addrcss differentfiom item 1? Yes
lf YES, enter delivery address below: E tto
3. SerybeType
-€€edfledilhil tl ExpesMailunegbtercd p'fteumnecetptforMercfnndiseE Insurcd Mail EI c.o.D.
?0ug E15B U0B3 t{813 ?hb?
Received by (Pin6d Name)
PS Form 3811, reoruary 2@4 Domestlc Retum RecelPt 10259il2-ttit-lSlO
THE STATE OF FLORIDADEPARI!{ENT OF EIWIRONMENTAI, PROTECTION
CERTIFIED MAIL 7008 0150 0003 4893 7657 June 18, 2009RETURN RECE]PT REQUESTED
In the matter ofApplication for Permit. by: Permit No.:
Sarasota County Solid Waste OperationsMr. Frank Coggins, Manager4000 Knights Trail RoadNokomis, Fl. 34275
1 30542-00 9-SC/ 0 I
INTENT TO ISST'E
The Department of Environmental Protectj-on gives notice of its
Intent to Issue a construction permit (copy attached) for the proposed
project as detailed in the application specified above, for the
reasons stated below.
mL^ ^^^1.1rrrs q!,yarcdDtT Sarasota County Sol-id Waste Operations, applied on
December 30, 2008 to the Department of Environmental Protection for a
permit to construct a landfill gas collection and control system for
Phase I of an existing Class I landfill, referred to as the Central
County Solid Waste Disposal Complex, subject to the specific and
qeneral conditions attached, located at the north end of Knights Trail-
Road, 2 miles east of I-'75t northeast of Veni-ce, Sarasota County,
Florida.
The Department has permitting jurisdiction under Sectj-ons 403.707
and 403.861, Florida Statutes (F.S.), and Chapters 62-4 and 62-10I,
Florida Administrative Code (F.A.C.). The project is not exempt from
permitting procedures. The Department has determined that a solid
waste construction permit is required for the proposed work.
The Department intends to issue this permit based on its belief
that reasonabl-e assurances have been provided to indicate that the
proposed project will not adversely impact water quarity and the
proposed project will comply with appropriaLe provisions of Chapters
62-4 and 62-70t, F.A.C., subject to the specific conditions attached
in the permit.
Pursuant to Section 403.815, Florida Statutes and Chapters 62-tt0
and 28-105, F.A.c., you (the applicant) are required to publish at
your own elq)ense the enclosed Notice of proposed Agency Action on
Permit Application. The notice must be published one time only within
thirty (30) days of receipt of this intent in the legal ad section of
a newspaper of general circulation in the area affected. Proof of
publication must be provided to the Department within seven (?) days
of publication of the notice. Failure to pubrish the notice and
provide proof of publication within the all-otted. time may result in
the denial of the permit. The Department will issue the permit with
the attached conditions unless petition for administrative proceeding
(hearing) is filed pursuant to the provisions of Sections 120.569 and
1"20 .57 , Florida Statutes .
A narcnn whose substantial interests are affected bv theLqIIUIqf IIIL9! gD UD q
Department's proposed permitting decision may petition for an
administrative hearing in accordance with Sections 1,20.569 and 120.57
of the F1orida Statutes. The petition must contain the information
set forth below and must be filed (received) in the Office of General
Counsel of the Department at 3900 Commonwealth Boulevard, Mail Station
35, Tallahassee, Florida 32399-3000. petitions filed by the permit
applicant or any of the parties listed bel-ow must be filed withinfourteen days of receipt of this notice of intent. Petitions fil-ed bv
-2-
any other person must be filed within fourteen days of publication of
the public notice or within fourteen days of receipt of this notice of
int.ent, whichever occurs first. A petitioner must mail a copy of the
petition to the applicant at the address indicated above, at the time
of filing. The failure of any person to file a petition (or a request
for mediation, as discussed. below) within the appropriate time period
sha1l constitute a waiver of that person's right to request an
administrative determination (hearing) under Sections 120.569 and
L20.57 of the Florida Statutes, or to intervene in this proceeding and
participate as a party to it. Any subsequent intervention will be
only at the discretion of the presiding officer upon the filing of a
motion in compliance with Rule 28-5.207 of the Florida Administrative
Code.A petition must contain the following information:
(a) The name, address, and telephone number of each petitioner, theapplicant's name and address, the Department Permit File Nurnber,and the county in which the project is proposed;
(b) A statement of how and when each petitioner received notice ofthe DepartmenL's action or proposed action;
(c) A statement of how each petitioner's substantial interests areaffected by the Department's action or proposed action;
(d) A sLatement of the material facts disputed by the petitioner, ifany;
(e) A statement of the facts that the petitioner contends warrantreversal or modification of the Department's action or proposedaction;
(f) A statement identifying the rules or statut.es that the petitionercontends require reversal or modification of the Department'saction or proposed action; and
(S) A statement of the relief sought by the petitioner, statingprecisely the action that the petitioner wants the Department totake with respect to the actj-on or proposed action addressed inthis notice of intent.
-3-
Because the administrative hearingr process is designed to
formulate final agency action, the filing of a petition means that the
Department's final action may be different from the position taken by
it in this notice of intent. Persons whose substantial interests will
be affected by any such final decision of the Department on the
application have the right to petition to become a party to the
proceeding, in accordance with the requirements set forth above.
Mediation is not available in this proceeding.
Persons whose substantial interests wilt be affected by such a
modified final decision of the Department have a right to petition for
a hearing only in accordance wiEh the requirements for such petitions
set forth above, and must therefore file their r:etitions within
fourteen days of receipt of this notice of intent.
when the order (Permit) is final, dry party to the order has the
right to seek judicial review of the Ord.er pursuant to Section 120.68,
Florida Statutes, by the filing of a Notice of Appeal pursuant to Rule
9.11-0, Florida Rules of Appellate procedure, with the clerk of the
Department in the office of General counsel, 3900 commonwealth
Boulevard, Mail station 35, Tal-lahassee, Florida 32399-3oooi and by
filing a copy of the Notice of Appear accompanied by the applicable
filing fees with the appropriate District Court of Appeat. The Notice
of Appeal must be filed within 30 d.ays from the date the Final Ord.er
is filed with the Clerk of the Department.
-4-
Executed in Hillsborough County, Florida
DAG/sgm
AttachmentsCopies furnished to:
Sarasota County Elected Officials NotificationCarlo Lebron, P.E,, HDR Engineering, Inc., [email protected] Tedder, FDEP Tallahassee, (e-mail)Frank Hornbrook, FDEP, Tallahassee, (e-mail),fohn Morris, P.c., FDEP Tampa (e-mail)Ronni Moore, OGC Tallahassee (e-mail)Susan Pe1z, P.8., FDEP Tampa (e-mail)
CERTIFICATE OF SERVICE
The undersigned duly designatedcertifies that this NOTICE OF IIITENTmailed or transmitted electronicallypersons before the cl-ose of businesslisted persons.
deputy agrency clerk herebyEO ISSUE and all copies wereto the add.ressee and the listed
to the
FILING Al{D ACKNOWLEDGMEIIT E ILED,on this date, pursuant to Section1,20.52 (11), Florida Statutes, with thedesignated DeparEment Clerk, receipt ofwhich is hereby acknowl-edged.
L-lr-c:q(Date)
STATE DEPARTMENT
A. GetzofDistrict DirectorSouthwest District
Clerk SEamp
(Clerk)
-5-
State of FloridaDepartment of Environmental Protection
Notice of Froposed Agency Action on Fermit Application
The Department gives notice of its intent to issue a permit (File No.130542-009-SC/08) to Sarasota County Solid Waste Operations, whoapplied on December 30, 2008 to the Department of EnvironmentalProtection for a permit to construct a landfill gas collection andcontrol system for Phase I of an existing Class I landfill, referred.to as the Central County Solid Waste Disposal Complex, subject to thespecific and general conditions attached, located at the north end ofKnights Trail Road, 2 miles east of I-75, norLheast of Venice,Sarasota County, Florida.
Persons whose substantial interests are affected by the Department'sproposed permitting decision may petition for an administrativeproceeding (hearing) in accordance with Section 1-20.57, Florida Statutes.The petition must contain the information set forth below, and must befiled (received) in the office of General Counsel of the Department at3900 Commonwealth Boulevard., Mail Station 35, Tallahassee, Florida 32399-3000, within fourteen (I4) days of publication of this notice. A copy ofthe petition must also be mailed at the time of filing to Ehe applicantat the address indicated. Failure to file a request for hearing withinthis time period shall constitute a waiver any right such person may haveto request an administrative determination (hearing) under Section1-20.57, Florida SEatutes. Mediation is not available in this proceed.ing.
The petition shal1 contain the following information; (a) The name,address, and telephone number of each petitioner, the applicant's nameand address, the Department Permit File Number and. the county in whichthe project is proposed; (b) A statement of how and when each petitionerreceived notice of Department's action, or proposed action; (c) Astatement of how each petitioner's substantial interests are affected bythe Department's action or proposed action; (d) A statement of thematerial facts disputed by Petitioner, if any; (e) A statement of factswhich petitioner contends warrant reversal or modification of theDepartment's action or proposed action; and (f) A statement of whichrules or statutes petitioner contends require reversal or modification ofthe Department's action or proposed action; and (S) A statement of therelief sought by petitioner, stating precisely the action petitionerwants the Department to take with respect to the Department's action orproposed action.
If a petition is filed, the administrative hearing process is designed toformul-ate agency action. Accordingl-y, the Department's final action maybe different from the position taken by it in t.his notice. Persons whosesubstantial interests will be affected by any decision of the Departmentwith regard to the applicat.ion have the right to petition t,o become aparty to the proceeding. The petition must conform to the requirementsspecified above and be filed (received) within 14 days of publication ofthis notice in the Office of General Counsel at the above add.ress of theDepartment.
-r-
Failure to petition within the allowed time frame constitutes a waiverof any right such person has to reguest a hearing under SectionI20.57, Florida Statutes, and to participate as a party to thisproceed.ing. Any subsequent intervention will only be at the approvalof the presiding officer upon motion filed pursuant to RuIe 28-5.207 ,Florida Administrative Code.
The applications are available for public inspection during normalbusiness hours, B:00 a.m. to 5:00 p.m., Monday through Friday, exceptlegal holidays, at 1-3051 Nort.h Telecom Parkway, Temple Terrace,Florida 33635-0925.
-2-
Charlie CristGovernor
Jeff KottkampLt. Governor
Michael W. SoleSecretary
PERMTTTEESarasota County
Sol-id Waste OperationsMr. Frank Coggins, Manager4000 Knights Trail- RoadNokomis, Fl-orida 3427 5
SWD/58 /5L6I4130542-009-SC/08
Sarasota27"L2'6.57"N
the work or operate the facility shown ondrawing(s). plans and other documents, at
\d^/tnr^Ih/kda.vvv/ a
Prni ocJ. ' UEllL! untV Solid Wasteut Complex (CCSWDC),P Col lect ion/Cont rol-
ruction
This permit is issued under the provisions o lda Statutes,and Fl-orida Administrative Code RuJ-e(s) 62-. 20, 62-522,62-550, and 62-1 01,. The above named perm..{ ee i s herel-rrz arrj_ h l_n nor€nrm
he ^- -^€^-^* anSncnific Canrlif i^h +^ t --^ --da : n:rJ- lroJVSUMU VVIIUIUMI fn.a., AIIU llLdsg q ya!L 1ru
foll-ows:<i\oni f i nr'l I rr described as
To construct a landfill- gas collClass I landfil-l, referred to as
and contro tem for an existinq--1 la"-f.'! af uvurr Ly
Complex (CCSWDC), Class I Landfill- qrrhi anl- ha qnanifin and
general conditj-ons attached, Ioca end Knights Trail Road, 2miles east of I-75, northeast of Ven ty, Florida. The
Replaces Permit No.: N/A. new permit
Thic narmit- ^^nl-^inq nnmnlianna items Sgmmafized in AttaChment 1 that Shall becomplied with and submitted to the Department by the dates noted. If the^^-^'l
.i ^*^^ l-ts^^vvr.r1,rrqrrue uoLso are not met and submittals are not received by the Department
on the dates noted/ enforcementt action may be initiated to assure compliancewj-th the conditions of this permit.
Page 1 of 15
Lf
O Florida Departm.ntr
Environmental ProtectionSouthwest District
13051 North Telecom ParkwayTemple Terrace, Florida 33637 -0926
Telephone: 813-632-7 600
PERMIT/CERTIFICATIONWACS ID NO:Permi-t No:Date of Issue:Expiration Date:County:Lat,/Long:
82".AS'34.07"I/i31N( 9E
specr-trc condat.t-ons
1. A landfill qq
General inrornau)
.N
N:ry: :::
con ol
nstrutNtr-
q\rqtam
n ot:
Phases ICe q avl-rrnf
\.
\
grits'S$lffiQsn wel-f s (6-inch sl-otted PVC pipe), beJ-ow-ateral'b)$\ader pipelines w/3 condensate knockout
\u-f tpqqa:). System is afso connected to 3 existing leachate"\eanout\south and north sides of Phase I for condensateSinage \ \existing leachate collection system. Landfill gas
Qreyed fiom Phase f via gas Lransmission line to landfill gascQ$\rol unit focated south of future Phase 3. Transmission finecolNensate gravity drains to 3 condensate sumps (S-4 to 5-6).
\\\\\\\
IreNSp. Cond. #A.2.a.(3 ). Sheets C-03 & C-051
andancrfo qrrmnq /S-2 [ S-?\ anr] 3 conrjenqafe rr-tr:ns
Gas proces"t"n s\
)
Qa\ intet from gas extraction system, knockout pot, 2 blowers,-..*crf i c: I cend I cst ick f Iare unit . Condensate collected at knockf'down pot, bl-owers and flare drained via a 2" HDPE gravity drainline to condensate sump S-5. [ref. Sp. Cond.#A.2.a.(3), SheetC-061
PERMTTTEE: sarasota ".O
sotid lilaste operations pEkrr No: 130542-oo9-sc/o8Mr' Frank Coggins, Manager CCSI{DC Phase I Gas collection,/Control System Construction
GENERAL CONDITTONS:
1. The terms, conditions, requj-rements, fimitations and restrictions setforth in this permitf are "permit conditions" and are binding and enforceablepursuant to Sections 403.141, 403.161, 403.121 , or 403.861, Fforida Statutes.The permittee is placed on notice that the Department wil-f review this permitperiodically and may initiace enforcement action for any violarion of theseconditions.
2. ThiS nermit is rz:lij nnlrz fnr tha <nanifin nrnna^^^- --^ a*a*r+.i-,-sses ano operaEr_onsappried for and indicated in the approved drawi-nqs or exhibits. Anvunauthorized deviation from the approved drawings, exhibj qnani fi nr]_i nnc
or conditions of thi s oern it mav .'^nqf i f rrtc nrnrrrcls fnr tion andenforcement acti-on bv the Department.
3. As provided in subsections 403.OB7(6) and 443.)2 F. S. , the issuanceof thi.s nermi I cloes nof cnnrre\/ rn\7 rra<t- ad ri nh1- qyulrrrru u___ q€ any <i rra nri rzi I onoc
Neither does it authorize any injury to public ef p5ivare rl- \r Ar rn\,- uf
i nvas i on of ri ahfs - nor en\/ i n fri ndomant- ^f faA\\o l Qr:rat tLvL qrrJ rrt!!flr\jsrLlsrrL v! !qvsrqf,/ JLqU9/ ocal laws orreotrl:f i nre Thi s nermi 1- i q nnt I r^r: irror nf. 66 r^^r^-'-l ^€f L fo rfvL u yvqf vsr \{*' v! oPylwvar vr herf)trnerf mFnJ- nerm i I 1-haf merr hc rccrli rod fnn nt har :qnonrq nf!E !sYurrsu !v\NLlrs! qR-ysuer v!
which are not addressed in this permit. \ \FL^Ltfc
4. This permit conveys no titfe to l_and orecognition or acknowl-edgmentthe use of submerqed l-ands unl_
^f fit-la anrl ri
/ urlu v
erein proviconstitute authorityfhe ner:essarv J-itfe
On- rr the Trrrsraeg
Statefororofleasehofd interests have been obC from the S
the Internal Improvement Trust Fu vnraqq qi-a
6 Thiq normiI dnac nni- ral i arza No .'oinjury to human heaLth or wel f are, arli.mal-bv the construction o ation of t rmattherefore; nor does f ha narmi isYoo to ca
.--t ^^^ul1ac J 5of Fl-orida Scatute ment rul-eorder from the D
^^.F'.; ll^^
PE!ILLA L LEE
Lon as to titl-e.
from -Li I i r., f ^* L^-..apr_Lr_Ly ror narm ori fa n r nrnn6rl- rr nrrrcarl
ource, or from penaltiese pollution in contravention
qnanifin:l lrr rrrl-lrnri zorl hrr rn
vlrsr @ L
htari :nnrrrl-an:n.aq\ rh:]- rra/ Lrrq
t .i ++^A chierre r-omnl i:nr-g with the conditionsi i"' arri I Dena11-'ncnt rrr'es - Thi s nrovi sj on includes the
of backu uxl- faciIif ice nr qimil:r q\rqfamq r^rhan na-aqq:r\7
^^*^t l -^9Vr(I/a r dlrrul-es .
hth ditions of the permit and when required bV
1. 'i l- l- ao hrr nl-inn l-his normit qnanifin:llrr:nraac fn r'llnr^rauthori-zed EmenE p nnel, upon presentation of credentiafs or otherdocuments as r red by faw and at reasonable times, access ro thenrcmi qaq r^rhora tted activitv is l-ocated or conducted to:
\\\sanq maintain the facility and
occ l-n:nrl nn-rr en\/ rer-1-1rjs rhat- mllSt be ken1- ;ndefthe permit;
(a) Haveconditions
f b) Tnsnecf rhe f:ci I il_ rr acrri nmanl- nr:nri noc\v/ rrrr1lsuL urrv +sv---eJ / , r-*e , Of Opef aElOnSranr.l:faA ar r^^Ui1.ed Undef lfljg nern]r: :nriurrro IJs!rrLt u, arru
/n\ Qrmnl6 ^r mnni j- a- anrr q.rhcl-anr-es .]r ner:Tpf ^r- -+ -6,, I ^^-ltiOn\v/ oulruurruur v! paro.rrsLclJ dL olly t9uore:snn:hl \/ nanoqs,a-rz tn Aqqlrro nomn i:nce wi th ih iq normi f
^r f)anirfm6nrs uvlLLulralf 99 wf, LII L-.f r us!lrLr L vr ugyo_ ularsl-!
rufes.
Reasonabl-e time may depend on the nature of the concern bei_ng'i nrzaqi i n:1- aA
Page 2 of 15
crrq1_am< n€
instaf l-edof this
to aNNe
PERMTTTEET sarasota colrfsorid waste operations ,O* No: 130542-Oo9-sc/08Mr. Frank Coggins, Manager CCSWDC Phase I Gas Collection,/Control System Construction
GENERAL CONDITIONS:
B. If, for any reason, the permittee does not complyf ^ ^^--1.. ..r 'L ^:,, a^-ni ri ^- ^- I .i m.i teti on sneei fied inLv 9vltlyIy wrLrr Arry UUtIUaLIUIl UI ffrrlfLqLfvrr ryvur.6^-*i !!^^ ^L^1 1 immedi:tel rr nrnrri de the Denerfment withVY!ILLf L LEE DlldIf f rrurrsuro Lsry p! V v rvs L-ls ue}/e! Lrrrv-
information:
*^^^^-^t .i ^-^^.llvrluurrrP r r drrus,
i nnl rrrli na rlal-aqrravr sv+rrYnnnnnmnl i rnnaravrrvvlrLyr f qlrvv
with or wiff be unablefhic narmil- i-ha
l-ha fnl Inr^rina
-*iaf lu
and timesi orr if noti c avnaniari l- n
(a) A description of and cause of
/h) The nori nrl nf nnnnamnl i rnn\v / *-.-e tnnrranf aA f l.ra r6l- i ni n:f ad i i ma f L^9v!IsULgU/ LIle drAuIufvoLsu ulrtts Llfgcontj-nue, and steps being taken toreculrence of the noncompl-iance.
rarlrrno al imin:r esuvv / and nrorzonj-
The nermifiec ehel I he reqnnrsihlo fnr :nrr :nd eIl! vr saaf which may resultfnr nanr"l l-ia< arand may be subject to enforcement action by the
for revocation of this permit.q Tn er-r.cn1_ inn l-hjq narmif _ i-hc ncfmitrt ^r^*!- ^D LdllUD O -^^^ tL-f
aff
ronardq nAl- ac mnni f ari na rlr+- .n^ nt- l-rar i!EvvIuot lrvusDt IILVI1ILV!IIIV qdLq qllq VLIIS! J ormation relati +L^LIIg
construction or operation of this permit source wnacn are su to theDepartment may be used by the Departmerqt 'i rienca i n anrr cn f 6 ! ^^^^
involving the permitted source arising und€i StatutesDepartment rul-es, except where such use is403.73, F. S. Such evidence sha-Ll onl-y bewith the Florida Rules of Civil- cedure and ap
Tn 'fha narmi''-r^^ -^-^^- f^f lrs PsrrrLf L Lgg ag! gED LvFl-orida Statues after a reasonabl-enorm i l- l- aa rina< n^f r^r^ i rra rnrr nrh^*rrvL warvE arly vLlrsrha*rrtsna-+ -.'l ^^uevaL Llttell L I UIYD .
T1 FI'hic narrir i ^L I ^ nn I rr
wi-th Rule 62-4.12
alrrnna< i ment rul-es andladll rnrzi daA ]rnt^ratzar f ha!vvrsvs, ffvvrvwv!,
hts t\r,vJ brida Statutes or
Flor a Administrative Code, as applicable.
dused he extent it is consistent
iate evidentiary rufes.
namnl i anno nf 1. ha narm i tl- a.l aaJ- i rzi trzvvlyrrqrrvv v! erre I,v!1,!f
nt.
300,forby
any noTha narmi l-l- aa q
until- the transfer
72. Thisnarm i 1- 1- arl
13 i c narmi I
hc kenl- :t the work site of the
(b)
n^+^,f i n-UE LgI]LTTIf d of Avail-abfe Controf Technology (BACT)
erminati of Prevention of Significant Deterioration (PSD)\
nf nnmnl i rnno r^ri f h Qt:J- o lil:1- cr Orrel i f rz St:nrl:rrlqYusr r
(Sect j-on 2-500)
(d) Compli ce with New Source Performance Standards
d 62rIIAU
Page 3 of 15
PERMITTEE:Mr. Frank
Sarasota "orO
sorid waste operations "lt No: 130542-ooe-sc/oaCoggins' Managier CCSWDC Phase I Gas Collection,/Control System Construction
GENERAL CONDITIONS:
14. The permittee shal_l comply with the following:
(a) Upon request, the permittee shall furnish al-l- records and plansrequired under Department rul-es. During enforcement actions, theretention period for al-.1- records wil-l- be extended automaticallv unl-essotherwise stipul-ated by the Deparcmenr.
(b) The permittee shall- hold at the facility or other l-ocationdesignated by this permit records of all monitoring informationf innlrrrlina r'lt ^alibration and maintenance recorcls.asd all orioinafr(Lqrffusrfqrrus !suu!uJ Nq qrf v!!gIstrin r:har1- racnrdinnq fnr nnnt-inrr^r1e mnni1-nrinaurra- L reuurqJrrgo !vr uurrLf .-*- ---r..;1 l n I r I i nn \rruqufvrf/
reottired hrr i-l.a ncrni1-- nnn.i oq nf :lI ronnrj-s ras\.i -oderav yvrrrrru, vv|/rso v! urr !uyv! ur rRvur!uv rr f lri c narmif
and records of al-I data used to complete the ation for thispermit. These materials shatl- be retaineddate of fha s:mnlo ma^errramonr r6^nr1- naLreqr q! ErrLErt L / t syvr u, v nl i n
]troo rra:r< fram fha
unless oEnerwasespecj-fied by Department rule.
(c) Records of monitoring informat
mol qtt ramah t c .
fL^ -^^l.,rl ^^lLrrs alroly Lf udlthe resul-ts of
shal-.1- incfude:
].me orfo
na 1-lra :nr'l rzcac.g1]v qrlsf J eve t
\s.:\xos
i ts+^^!LLCC l-l- within a
w which is needed totee becomes aware the
I in fho normiI :nnlinrtinninformation shall be
*\N\\.N\
1.2
3.4.q rques or me
15. Whenreasonabl-e,{^f ^-*.i -^us Lg!lLtf IlgraI:-.--!
or in anyrarraai- aA
raatraql-ad l-rrr
time furnish
facts were
v! vrrrlJ u
J- ho F)an: rl. m lt c:nrr i n fnrmrf r
ha narmi i
tted orman1- all
fho rl:f a 6va^t- nl:naerre vq us, s^au L IJf q9g
the person responsible fo'
f l_r^ rl-f ^^ --- 1'-^Aq r^rora narfullY UaLED dlldf ybLr vvsre !sr !the person resRRnsible for per
l.ho no'
e ancorrfacts or
Page 4 of 15
PERMITTEE: Sarasota aoorCrofid l{aste Operations Pdlllr NO: 1305r12-OO9-SC/08l4r. Frank Coggins, Manager CCSI|DC Phase f Gas Collection,/Control Systen ConEtruction
SPECfFIC CONDITIONS: PARI A -Solid Waste Faci]-ity General Requireroents
1. Facility Designation. This gas control- system is designed to recovercombustible gas and shal-t be constructed, operated, closed, monitored andmaintained in accordance with all- applicable requirements of Chapters 62-4,62-302, 62-330, 62-520, 62-522, 62-550, and 62-10I, Florida AdministrativeCode (F.A.C.) and aII applicable requirements of Department rules.
2. Permit Application Docunentation. This permit is vafid for constructionof a gas collection and control- system for existing Central County Sofid WasteDisposal Complex (CCSWDC), Class I Landfill (Phase f), in accordance wit.h al-Irnn] inrl-'ra -^^"irementS Of Department rUl_eS and 1n aqcor e with thereports, pl-ans and other information prepared by HDR E hff Tnn i/rrnl oq<
"Y T
athcrwi qe qnoci f iarl\ aq fnl I nr^rc.4!!vs/
Central- County Sol-id Waste Disposal- I Landfil-f PhaseI Gas Col-l-ection and Control Svstem Constr ration PermitAppl-ication (3-ring binder & plan seL) embe ,nnQ if ranai rraA
\!vvv! ves
Donamhar ?O 2nnR \ : < rarzi cad -ani :nuEvsfrus! Jv f -vvv L oo !s v !Jsut !gPlau nAad / i' ti-oncol-Iated into original-s*) dated Marc 3, 2009 (receive ch 26, 2009)and dated April 20, 2009 (receivedincl-udes, but is not l-imited to: ,S
? Permit ModifAnrr a
approvednormi J- rrnl aqqrnnvansi -l^qPP! vP! aq Ls /Anrz q ntsh
f'anE
'l-\
col-l-ec
Perrnit
nataon
the construction of the Phase I gasand other related appurtenances, onlv.
iI 22, V009) . ThisNs. 'N.
l-) Section 2 - Engineering R
2) Section 4 -
3) Pfan Sheets
fications; a
rirf it Drawin entraf Countv SolidWaste Disposal Complex, I Gas Col-l-ection andControl- System... (f7 Sh i ^^ ed April 20. 2009(received ApriL 22, 2009
^^^--+.1 ^^uygr a Lfurr other activities not previouslvnarmi | <h '1
-^r'.i -^ r -^^rrti6 flonrrl_manl-r +cYurrc q DcyarqL.s uEPor LrrrsllL
-^*+ '-t^f^ s a nermi i mocli fication to be morenrrecl in wri i ino l'rrr thc DenarfmFnt.
truction or operation at the facilitymodifi on. Permits shall be modified in
FL^LtlC irements of Rul-e 62-4.080, F.A.C. A modificationv to l-ead to substantiall-y dj-fferent
ronrri ra a def : i I od rorri or^r h\/ j- he Dcn:rf mFn1-rsYur!rmodification.
q narmi I thori zesand co I <rz<fam
or before January 1, 2014 the permittee shafl notify4.the Department in i nc nr clect- -nnir:al I v of its int^-+ r^ --6r " t^- renewal-!r19 v! sfsuL4vrrfu**-J ----€IlL
UW Oyyry !vl
nf j-hi < narmi l- : f the anticipated date of submittal of the permit renewalapplication. No later than May t, 20L4, the permittee sha}l apply for arenewal- of a permit on forms and in a manner prescribed by the Department, inorder to assure conformance with atl applicabl-e Department rules. Permitsshal-l be renewed at -Ieast every five years as required by RuIe 62-4.090'F.A.C. and Rule 62-701.320(10) (b), F.A.C. In the event that the regulationsgoverning this permitted construction are revised, the permit renewaf shaflinclude modificati-on of those specific construction conditions which areaffected by the revision of regulations to incorporate those revisions inaccordance with Specific Condition A.8.
* see OCITLUS for un-collated submittals
Page 5 of 15
-i --. ^^
ich is reasi-ronmental-
PERMTTTEE: sarasota ""CI sorid wasre operarions
"lrr No: 130542-oo9-sc/08Mr. Frank Coggins, Manager CCS!{DC phase I Gas Collection/Control Systen Construction
SPECIFIC CONDITIONS: PART A -So1!d Waste Facility Gerer"l R"qoir.r.rts5. Professionar certification. where requi-red by chapter 4'.-r (p.E.) orchapter 492 (P.G.), Florida statutes, app-ricable portions of permitapplications and supporting documents which are submitted to the Departmentfor public record shal-l be signed and seal-ed by the professional- (s) whoprepared or approved them.
6. General Conditi-ons. The permittee shal-f be aware of and operate underthe "General- Conditions. " Generaf Conditions are binding upon the permitteeand enforceabl-e pursuant to chapter 403, Fl-orida statutes.1. Permit Acceptance. By acceptance of this permit thi ff^^
certifies that he/she has read and understands theSpecific and General Condj_tions contained herein a
:tinn< imnaqed hrr tho'i nr-l rrdi na ri:f c nf
permit expiration and renewal deadl_ines. ft is afaifure to compJ-y with all- conditions and deadlin
of o€ 1_hiq narmi1- for
Regulations. Chapter 62-j0L, F.A.C., ve May 27NNRQ01/ ISin^^e^^--r^r l*-a i- h.i q narmir 'l-,,, ro€orrruvl1:vraLsu lltLL l.elef enCe. fn the event tha racrrl:i-iancgoverning this permitted operation are r iifrrthe permittee, and the permittee shal-I n <noni f i ncondi-tions which are affected by the revisi e^^r-+^
!|JV!AL€
tnose revl_s10ns
Prohibitions. The prohrbi of Rufe 62 300, F.A.C., shall not beviofated by the activities at thi i I i 1- rr
In the event that Lime ri -- ^''^^-.-ri ^-rJ_ng excavaE.l_on orconstruction activities, the stru ion activities shallac:qa :nd f ha -lanrr+na^f
-L-1-qlf u uf rs u=PaL LlLrYltL Jrldaa ar 24 hours of discovery.Written notific haLf be s ted wi 7 days of discovery. Thewritten notifi af1 i-ncl-u the loca'tion, efevation, and extentof limeston : cleqr-r'i ntinn ^" the matefialsencounte of action
^A fLa nnnrr+*^n1 q*ssu, Llr\ uvlJd! LtLLErru rrrsC mocii(ication of th( e.f tqsrlqtions to i
'i ch ensttres that crarrndw: f cr wi I fY! vqllsvY q e
Rinrrod nnncl-rrrn1- i^^ --.] ana-rtl^'qv ervrr qrru v1;s! q u-ur-l Ofnot be adversj- ha frni I i t-.'rl.^
benotiand sicorrecttthe uniwater.
with Rul-e 62-707.300(3) and Chapterrequlre longer than one (1) hour toto the Department in accordance with
hrr J-lra n
const tion activities shal-l not. resume innJ--:nn-^rraA nt.- of action has been
tsL -Lftd ce depressions or other occurrences whichf siri e activity or subsurface instability, areor within 500 feec of rhe sjte, the Deparrment. shal-ldance with Specific Condition #C.6.b. The writtenncl-ude a description of rhe incident, the focationcted area shown on an appropriate plan sheet, and a
lan which describes the actions necessarv to preventcharge of waste or leachate into ground or surface
nrohihi l-ad av^ahf
62-256, F.A.C. Allext-i norri sh mrrei_ ho-__--_'J*-"
Qnani fi ^ a^h.li +'JIJSurrrL uutlLr_L Ll_On
in accordancefires which
nromnfl rr rennrfed
In thebe indicatvered on-si
fied in aion shaf
Page 5 of 15
PERMITTEE: Sarasota CooOSofid Waste Operations PIET NO: 130542-OO9-SC/08Mr. Frank Coggins, Manager CCSI{DC Phase I Gas Collection,/Control System Construction
SPECIFIC CONDITIONS: PART B - Construction Requirements
t. Construction. A11hrr i_ ha f)an: rf manf nrr Ary! rvrotherwise.
significant construction activities shal-l be approvedtn i nr f .i:i- i nc urnrk. rrnl oqs qneci tr ^^r r,, -,,+L^-i -edLv f,tt*LIqLfIlV wv!4, ultfsJo oPsUIIIUAff,y qUul]v!fzt
Thi < narmi f authorizes the construction of the gas colfection andPhase I of the Class I landfill- and rel-atedconfrol srzqtem €Clf
annrrrf enanr-es nnl r,r
2. Certification of Construction Conpletion. Al-l- information required bythis Specific Conditionnrnfa<qi nnrl anai n66r n F
ehrl l ha q.i anafl r--l -^.1^.l l^" -rarqrr !s or\jlreu dllU Dsalcu !y d ^f^-ai
land surveyor as appropriate.
Within sixty (60) days after the specifi nstruction has beenr.nmnl ai. cd. j_ hc fol Iowi ncr :cti rzi f ies Shall-I ho narm i | | oa f nr f)anr rl- manl- rnnrnrz: I Ona
-ts-
1) The owner or operator
not be lim
\...'\\-orN.r ^r-*^r ^*\ ^^-r^r k,,\r\x,i( r DagrrEu dr\u DEqf Yu uy
\\construction and qual-itv
rnrl <rrl.rmiffod hrz
constructedl-ad nri nr fn
cific
submi - ^^Fr I ti ^-+d Ug! L!!TUOL
but
Construction Completion, Forml- ha nrnf aqqi nna'l anni noor i n nh=
assurance to the Department for ap I anrl chal I rrr:nao fnrLl
construction in thecompany of the permit rL^ ^-^{ *^^-Llrg grrlj !rrsE! the facifj-ty operator,)\ Tho ar^rnar nr
^na submit rd Drawinqs/Documentsqhnr"rina all nhrnno< l;
\+!-l ons / el-etions, revisions to
f ha nllnq nrarri nrrql rr rnnf sYv rtment including sitecrrdaq:n qL!ulr-,/ . narA ts shall include, butnot be o as-buil- I ^*^IdIID, ail-s and elevationsI qrrrrz
?\ 6naril-nr submit a narrative indicatinqal-I chan FL^ ^^ of the deviations, and
€l ^-!!]UAL rawings/Documents by the Engineer tortme
^ €^ submit to ther^'.it-h l-ha nl:nq rn^w ! Llr urr9 Pr arrJ arru
AAAIl \ .*I /Q\tvv \ /,/ arlq \u/,
Departme €] ^ -!IIIO
qnani f i ari l-n
Lngs/ ts. The Record Drawings/Documents shal-l- include,information:
As-bui\$ survey of l-ocation and el-evations al-ong landfilJ- gasl, ^-i^- --.J nsmission lines and condensate discharge lines and drain
h Ground surface elevations and we-Il depths for each of theextraction wel-l-s and horizontal- coflector vertical borings fisted on the"Wel-1 Schedul-e" identified on Sheet D-01 of the Construction Drawi-ngs
[ref. Sp. Cond. #A.2.a.(3)];
Cnn i aq nf nhnrna-:nl^s dnr-rrmenj_ i nn .a I I st:.rFs rrf the constfuctionvr ylrvuvYrqlJrru
l-on otbei
arl Frr ihi've vJ
al enoineer of record shallrt to verify conformance'iordance with Rul-es 62-707
pipes [ref. Spec 02221-3.9.A.];
Page 7 of 15
PERMTTTEE: sarasota """Osolid
waste operations pdffrr No: 130542-OO9-sc/08!tr. Frank Coggins, Manager CCSI{DC Phase I Gas Collection/Control Systen Construction
SPECIFIC CONDTTIONS: PART B - Construction Requirenents
4. Pre-Construction Meeting Notification. Department Sofid WastePermitting staff shafl be notified at l-east one (1) week prior to all pre-construction meetings. Prior to initiating construction activities, thepermittee shafl- make arrangements for che Engineer of Record to meet on siteand dj-scuss al-I plan changes with Department Sotid Waste Permitting Scaff. Acopy of the minutes from the pre-construction conference shall be submitted tothe Department within two (2) weeks of the conference.
5. Construction Schedule and Progress Report.The Engineer of Record or another qualified ^ ^ -.1 ^-. - l
sh:l I m:ka ncri orli c in<na^r'i an< rlrrri nd -^n<trrr^J-frlY evrrr A\ on qrrrerlac.i nn i -f an-i f ,, iS maintained
b. An updated construction schedule and egr5rh
ennrf sh:l'l hasubmitted to the Department monthly, by month. Themonthly progress report should be submi(Q,qQ e\ectron)Nor in an appropriately fabel-ed three-rinq b\aer of su
+L-fLIIO L
\7 rn Pt)ts iArhrr
ent size to
r6dlraeJ.c.
f1- ^
store the monthly progress reports fqr the entire projeprogress reports shaff incl-ude, bu
"\\'1) A narrative explainingqi-adaq nf rha nancfrrrnri nn.u! uv!!vrr/
2) A qrrmmrrrr nf c ittals and c
3)
4)
Constructioncol-l-ect.iondemonstr:nd nr
^L ^ I 1-lrdar
1.Arrri nn I
laboratory.'
Construi
Weekly progress
Cnlnr nnnia< nf
ntrol
ogrtypical construction act riwhich shconstruuullLAl
copl
onn-J-i nn neri nd andI-vrfvg,
aIl views ^! - i I -eLd!45 mrinr c1-:noc nf
li-i+-lu!9rL4r P fnnr:nhq rra r:lzan : 1-l-l-Qnn
cographs tqey b" submirted in l-ieu of princeci
\_K-1*S..:t eleVations of the landfill gas
drhe
rr'lpd :r : frccrrcn.\/ sltffir-ienf fgand l-a't"B\N'ls have been constructed to the sl-opes
s and will drain adequatelv. This lnformationcuments.
Requirenents. FieLd -^.{ I r-r.nrr+ar.' *pqfi 66dltu aa!v! d Lw! y LvJ u-rrya
^rralifiarl tacf inavs evu etrrYies shall- be conducted by
Assurance.8.set of construction drawings anditions, deletions and revisions,
shon clr:wi nrrs. whichshalf be maintainedincl-ude dai
on-site at times for reference
b. Leachate or gas condensate shall- nol be deposited, injected,dumped, spilled, leaked, or discharged in any manner to the land,surface water or groundwater at anv time durlnq the construction-^ri--l!:^^AULfVILISD.
c. Unsatisfactory/ defective or non-conforming work shall be reportedto the Engineer and sha1L be corrected, or the reasons for notcorrecting the work shall be recorded and maintained onsite forreference and j-nspections. Documentation of the corrections or reasonsfor not correctj-ng the work shall be submj-tted with the Record Documentsrequired by Specific Conditions #B.3.
Page 8 of 15
c\rhe monthly
dalrrrl.\ nf mrinr
included
structionTesavl_
PERMTTTEE: sarasota aolrf aorid waste operations p*T No: 130542-OO9-sc/08!tfr. Frank Coggins, Manager CCSI{DC Phase I Gas Collection/Control Systen Construction
SPECIFfC CONDITIONS: PART B - Construction Recruirements
(Specific Condition *B.8. I cont' d)d. Excavated refuse shal-l- be loaded and transported to the Cl-ass Ilandfifl- working face by the end of each working day. No refuse shall-be aflowed to remain uncovered overnight. The refuse must be removedimmediately during any rain event to prevent stormwater from contactingthe ref use . [ref. Spec 02221-3.3 A. & B.]
e. The non-perforated PVC latera1s,Iines/ connections to LFG header, andsubjected to pressure tests to detect1s060-3.41
f. AlI dewaterinq l-iouids shall be
]eachate and condensate drainrir qrrnn]rr linaq chall ha
piping. [ref. Spec
Ittqlra9 g aLr+a
Page 9 of 15
PERMTTTEE: sarasota ""rtsorid waste operations pdffIr No: 130542-oo9-sc/o8
Mr' Frank Coggins, Manager CCSI{DC Phase I Gas Collection/Control. Systen Construction
SPECfFIC CONDfTIONS: PART C - Operation Recnrirements
Facility Operation Requirenents.: 'laha narnifi-oa <h:lI nn6-a1-a fhis far-:iIitv in accofdance WithLs Lfrf o rqvrrr uy
Chapter 62-10L, F.A.C./ and Operation Permit No. L30542-007-SO-01,/:nnl-rA.in^ *^.rr F.j catinns_ i f :rrr\ nr if s sltr-.FsSOrS.\rarvrger.ly Lrvlro t LL alry I I v! rur ruvvgor
p . ']'nr- scol-lection€n'l I ^'.'i ^^Pormi i-l-aa
normi t rina< not authorize the operation of the Phase I gasand control- system and other rel-ated appurtenances until the
reorriremtrnf( h:rrn r^^- ^.^r and submitted bv rhefrLJ llavg UCerl UvrltlJlgUgq qrlU DUVILtfUUEU UJ:nd :nnrorrarl hrr l- ha F)on: rl- mani .
1) Certification of Construction Comp]e ui-rements ofSpecific Conditions #8.2. and #B.3.,
2) Issuance of130542-007-SO-01J-ho landfi ll d:e:nnrrrl-an:nnac
: na-mr 1- mndi .i.a!i of ation Permit No.or r-ts successor, w auL ae nharal-inn nf
col-Iection and co(tNro DyD LVrrL.i+-
-^l ^F^i]LJ ICIALCU
The nermi fj-ee m:rr icmnnreni I rr nnoreuvrlryv! q! the corqstructed sysSN.fo{ up to, \\\ . \\\\\\\\\\\\\\\\\ana opeNlEr_onal aolusrwNwl!s wnare180 clavs to al I ow for svstem .starthe certification of construction corequired by this specific condirionnotify the Department electronicalty
Leachate and/or qas cclttmncrj- enillad la:lzad ^ruyrfrver 4vq^uv,
water or qroundwater outsideat
^n\/ timc rJrrrino j-ho .^nqfrrl
2. Facility Persnorqnnno'l Far an'-n t1in an nrdar'l rr nd sa
? Control of Accontrolled ired
4.Perml
tori't ?nq/ t-
suc
EAJ. V of Nuiodors, vec (mosquit
r-onaror
^L-t lJlldfr noi_n any m
I ^-^feau
I ++^l ^ --lI L LdIJ dI]U rovals
of the start date for
cit-a.{ iniant-adufuvvt
r f n qni I e qrrrf:^^! Lv rvr4r' ru!laug
of this facilitv.1i
r-on
owner *-^,,.i i^ -i^^,,-+provrue aqequaLe--.infrj-i-^ -h^ F:ni'l irrrrrLafllLaIlrf I19 uItY r dulIl uyart1-rndvrse+rlYt
ary manne
^ -^J e nf J-he faniIil-rr chr'lI hov v! t
/q\ tr a a
&^^ shal-l be monitored as required by Operation!i-.- -^li€] ^-!i^nc i€ rnr,\ ^- itsUII19 lrr9qf IluaLf UIIJ I LL OIIy I I V!
tions. The owner or operator shal-l contro1n1. har i ncanf c rndanrc\ rnrl f-.^i l i -'a ^-Ftl ^rr"l -f ^df vLf Is! ItIoSULJ/ !vusrILJ/ / ol]u !u9f LIvC rUOI LIUUIqLED
the construction and operarion so as to protect the(dust/ smoke qi nn f
^"1^l i ^ k^^l rLIruvf ru rrgal uIt . Such control shaff minimize the creation ofhltl cin^6 n^hdl i :dini ni nn nrnnart\/. Odors okrserrrcd hrz llenarf nenlvvyqr u{ru11
personnel- upon si-^e*i
l!^^ *..^r Ipermr_Eree musE. E.a
spection, shafL constitute a nuisance condition, and theimmediate corrective acti-on to abate the nui-sance
| ^;i t ina
Page 10 of 15
PERMIITEE:!{r. Frank
sarasola aoo|rorid waste operations "t* No: 130542-ooe-sc/08Coggins, Manager CCSWDC Phase I Gas Collection,/Control syEtee Construction
SPECIFIC CONDIIIONS: PART C - Operation Requirements
6. Facility Maintenance and Repair.a. The site shal-l- be properly maintained incJ-uding maintenance ofaccess roads to disposal- areas, equipment, stormwater and l-eachatemAneClcmenf srzsf cmq an\ror qrzqf amq rnd harmq di e mnh i l- nri nn :nduvrLre, oJoLsrlLo qrfq !E!ftro, YaJ ILLUIIIuv!IrIV qllqmanagement systemsf surface water monitoring system/ and groundwatermonlf nrinfi s\/stem F.rnqinn and nnndod r^r^f ali n di qn^qil rrar- -h.l I l-rarlrY eJ llvrrvff olru }Jvrrusu wqLU! frl vroyvJq! alEoD DItqIMnra\76n | 6^
b. In the event of damase to anv portion of the l-andfil-l- sitefacilities, unauthorized l-eachate discharges, fail of anv norfion off he 1:nr'l f i I I qtzq1- amq linnlrrdina rl--.^^-l ^, .i-.' -4rr oJoLsrLro \arturuuflrg uotLLagsu v! ury gwel-l-s), fire, explosion, the development of si or other
irnnediatelyoccurrence and
rran^a rnd fi ma44vfrvvt
subsurface instability at the site, rhe permi hafl(within 24 hours) notifv the Department expremedial measures to be taken, method to
be subnitteding the
Routine maintenance does not requj-rece.noted on
daily reports.
1. Stormwater Management.srrs1- em clesi anad .^n<1- rrrnl-arlvvvr:Jrrvst uu usu,
water from running on to wastes\/stcm cioq ianorl ^nnqf rrr^rariuv Lev,
s!vsv, s
r^t -*i *^j-UVq, qllu ltt@IIl d to collect and control-
The site shafnnaral-ari anrl ned to prevent surface
stormwater runoff control-
Rule 62-701.500(10), F.A.C., to mee\62-302, and 62-330, F.A.C. The stor
stormwater to meet the requiremen Chapter 62- k a I ahd lh6
requirements for management and st surface accordance withY J LdlT nf f-l-rrnl-ar< 6,2-?
Lv v- Jf
\r<f am qh:l "l ho'i nqnacj- cr] fnr dam:aa rnri nrn^arlrrrlruuLeu !v! ua...*y 1---1.-, Opef
Page 11 of 15
PERMITTEE:Mr. Frank
sarasota """0 sorid waste operations rtrt No: 130542-009-sc,/08
Coggins, I'lanager CCSI{DC Phase I Gas Col-lection/Control Systen Construction
SPECIFIC CONDfTIONS: PART D - Recordkeepincr
1. Report Subnittals. Unless otherwise specified/ al-I submittals,nofi fi caf i ons - ranrraqrq fnr narni f mnrij fi c:i i nn - rcnn-fq fnr nnmpfi2plge WithqLrv]r,
this permit, etc., shal-l- be sent to: Sol-id Waste Secti-on, Department ofEnvlronmenta1 Protection, Southwest District Office, 13051 North TefecomParkway, Temple Terrace, Florida 33631-0926.
2. Operation Plan and Operating Record. Each landfilt owner or operatorshal-l- have an operational plan which meets the requirements of RuIe 52-701.500(2), F.A.C. A copy of the Departmenr approved permit, operariona.Inlen- a^nqi-rrrcJ- inn ron^rJ- q :nrl ronnrr] rlrrr^r'innq rnrl crrn!suv!u u!awIrl\jJ/ olru ou}J i na i nfnrm:t i nnshal I be kenf a1- 1- ha frni l i l-rr :t- af l_ timeS fOr referen 'i n cnanf i an c
t r6 ^i rl- n f J- l-roOperating records as required by Rufe 62-701.500(3),operations pl-an, and shalf al-so be maintained at th
3. Waste Records. The permittee shalf maintaiq afl- r ranr,i rarl hrr l-l-ra!eYsr!v\l vJ
nrnrli rla cani oq
Financia]. Assurance. The permitte :l I nr I l^ ^i^^,,-+rus ausr4ua L
assurance for this facilitv and rel_at i-n accordan ith Rule62-10I.630, F.A.C. and Operation Permit No.modifications, if any), or its successors.
SPECIFIC CONDIIIONS: PART E - Wa
faf
42 \o-or (inc ang
W
N
h crra'l il- rr mnni1- n'- -rrng130542-007-SO-01
it Moni
1. Water Qual.ity Monitoringshal-l- be conducted as required by/innl"Aina mnn.i €i ^-f .;^-- .i € -^.,\rarersvrr-y aL,vvr!rt;aL-Lons, 1r any), o
ao;ts
.**l\**
Page 12 of 15
SPECIFfC CONDITIONS: PART F - Landfill Gas Manasenenr
1. Landfill Gas - NSPS and Tit1e V Ai-r Requirenents.a. This sol-id waste permit wil-l- meet the statutory requirement toobtain an air construction permit before modifying or constructing asource of air pollution, except for those l-andfil-l-s that are subject tothe prevention of significant deterioration (PSD) requirements ofChapter 62-2L2, F.A.C. Facilities that are subject to the PSDrequirements shal-l- obtain an air construction permit from the Bureau ofAir Regulation prior to beginning construction or modification pursuantto Rule 62-210.400, F.A.C.
h- The nermi tl- oa <hr'l l nnmnl r, ..,.i +l, -Fr' -hhl.;rrrE yE!rrrr L Lss rf tqf f uvtlr}Jf y wf Lrr arry qyIJrr le V airnnarat. i nn na--i | :nnl i n:f i nn ronlljlementS OfqLrvlr rsYl
40 CFR 60, Subparts WWW and CC, as adopted ber 62-213, F.A.C., and
204.800, F.A. C. Titl-e V Permit applications I submitted to theDistrict Air Proqram Administrator or Cound rP m Adrninistrator
PERMITTEE:Mr. Frank
any
A
dratl-6r +l-i
-r^^+^- rL^-vr so LY! Llldltf)an. rl- m6nl-Urrrvla u ,
Sarasota "oufrorid
Waste operations "nr No: 130542-ooe-sc/08
uriflr :ir narm.i++.i-^ -.,f).^-.r+,, t^I the 1a45$(iyslrtrf L Lrrlg quLrrv! I Ly !u
Coggins' Manager CCS!{DC Phase I Gas Collection,/Control Systen Construction
ence at Rul-e 62-
c. The permittee shall- submit to Division of Air urcesManaoemenf - Dcn:1lJ61gnt Of EnVj-r Prnl-anl-ian M:i l vdi$\ JJvv,
3900 Commonwealth Blvd., Tal-lahaqg$a^n:ai t\7 ranorj- :nrl rnrz Nl^h-M6l- h^6^vuyqv4 u qrru a]lJ rlvlr rfE Llrdf rc
3239N3000, any d riaqi nn
retF rcn^11- es annlir:ahle- nrrrsqant!eqv+v, yq!r, 757 (a) (3) ollu \u,/
Gas Monitoring and ControlLandfil-l- gas sha11 b tored to de afe comnl i ance with the
criteria establ-ished in Rul 530 (l- ) (a) , . (fess than 258 ofthe lower expl-osive l-imit (L ustibl-e
und (NMOC) ssr_on
es in structures andar l-rarrnnrl l-haIess than 100% of the LEL for
property boundary).
b. The owshutdown of.I nnaar ra
nrc rranl-inaY*vrnnlinrfinn
const 1rl vPc
rmi-
dJeS
ator shal control- I.Vndfifl qas after the^-i€; I1arrurrr! 9 r:olIer:fion swstem fi tr r-r:s is nclIer or thearri rar{ i- }ro
modif ti-on to authorize its
Landfill- gas monitoring shall be conducted
lare). In the event that a passivernn:er or ooerator shall- submit an
fo
AS
ifll^ll )-I lll/-qlt-lll tah^lrrdrn^ h^drf 1^-rr^h^vJaa-vw / -ov-vt \rlluf uqfrlg riLuurtruaLrull)t
ructures both on and off of the landfill- site, orrrrnerf \/ hnrrnd:rrz- f hp nwncr sh:l ] submit to |heuf vvslrsqrf /
of detection, a remediation pian detailing thenature and exten ^ -..^Lr ^ rlo nrnnnqed rcmcdrl Tha remedrl shaffs Prv!rEltt otlu urlg }J!vvvJsu !srlrgu]. rrr9 rgrLrsvy o becompleted withinI-)onr rf man I
of detection unless otherwise approved by the
l-\.' n^^--+.1'vJ vPg!OLr
ts succes
? inside
Page 13 of 15
PERMTTTEE: sarasota ""rOsotid
waste operations piltr No: 130542-oo9-sc/ogMr. Frank Coggins, Manager CCS!{DC Phase I Gas Collection,/Control System Construction
SPECIFIC CONDITIONS: PART G - Closure and Long-Term Care Requirements
1. Closure Permit Requirements. No later than ninety (90) days prior tothe date when wastes wifl no longer be accepted for portions of the landfillwhich have reached closure design dimensions, the fandfill owner or operatorshall submit a closure permit application to the Department, in order toassure conformance with al1 applicable Deparcmenc rules. A cl-osure permit isrequired prior to implementing closure refated activities.
2. Final- Cover. Portions of the landfill- which have been fil-l-ed wi-th wasteto the extent of desiqned dimensions shall be cl-osed (shall receive final-cover) within 180 days after reachingRul-e 62-701.500(7)(S), F.A.C. and alfrules.
oesagn or_mensaons, accordance with--'-.1 .i ^^Lt ^ -^^,,.iqPPafualrs !sYur nf Dan:rimon1-
? Long-Term Care Requirements.a. The owner or operatoraccordance with Rule 62-701.Permit No. 130542-007-SO-01successors.
dcscni ni- inn nf the nronnserJ rrse and'IanrlfiII e\rq1-6mc (a a final
^A\7ar\ v. Y . vv v vr /
require a permi-t
Exe
for the site inhe con c nf Onaral_ i nn
n:l- i ancvuu!vr]U, rr\ nli 1- qJt I
t fim to, water Lvf t
tion, the owner orr:l oseci nort i ons of
hall- include a
VqIUA
c oDr bottom liner)ri aia af^ Tha
ed withou r10r rtment approval, andnarm i I
-i ,'l^rua
STATE OF FLORIDA DEPARTMENTOF ENVIRONMENTAL PROTECTION
Deborah A. GetzoffDistrict DirectorSouthwest District
qhel I norform - LC
620, F.A.C.,( incfudin
h T,nnff-torm c:ra inclrrriaq'Ia-^l-.^+^
^*l .its^-;*- *-.1-+^-^!soullqLg 4rIu 9qD lrrvlrfLuIfIr9t l[4allLcrrdmaintenance of the l-eachate collectioncnnrrnl and l-ha nrarranfinn nf nnndina
r qlrv v ! yvalur lrY
A Use of Closed Landfi].l ior toAna12f
^r cha l I e'.1--.i F - hl -h €^r 5VIJL!aLV! OlfArf OUulttfL A PIaIM! d sed UJED U
the fandfil-l to the Department for
6nd1 naarr hn d6cr -nc ations and SASA:r-f irzi f rz sh: l I no!
n rnnn < ari
may
inal cover SVstem/oval syslemf erosaondi <nacr'l :ra:q
Page 14 of 15
eERMTTTEE: sarasoua coonlsorid waste operations PE* No: 130542-OO9-sc/08t"tr. Frank Coggins, Manager CCSV|DC Phase I Gas Collection/Control System Construction
ATTACHMENT 1
SPECIFICCONDITION
SUBI*{ITTAI DUE DATE REQUIRED ITEM
AA No l-ater than January 1,20r4
No l-ater than May 1. 20L4
Notification of date ofnarmi f ronar^rel
application submittal-
Submi(\plication forperrq$" i\newal-\
A. 9. a. Within 24 hours ofrl i qnnrzarrr
h7i't-hin 7 d:rrq nfnotification
NNNNNication of sankhoies;; Nsrface instability
.N.\\N\\\i..
. \\\\\\\\\\\\\
\ritteil$gification &
Correctiri\ption plan
8.2 . a. InTi .t. hi n 6O d:rzq nfvv ssfv v4
nnmn'l af i nn\brnit certifiN)on of\truccion ccNptetion'record drawings, etc.
B.4. l! I ^^^!NL fgdDL
No l-ater thanra-nnn c{. rrrnl-
prl-or i- i f rr nf nrcnnnsf rrra-f i On1ng
Jt,t
N\Xss'
m6af r'na mi nrrf aqrrrvv uJlrY
\\
N' bY the\sw each "\ crrl-\mi r manl.h l rr nrncrcqqu uvrrrf t rrlvra erlf f
rcnnrf t sr:heclrr Le
c.6.b ,N withl_s\:.NN
.with\Ntif
days of verba]
hours Notification of:sinkhol-es, failure ofl:ndf j lI s\/stems oI^-..1^-^-+ ^f^cqufPrtlErrLr 9LU.
Written notification &
corrective action PIan
Page 15 of 15
IBrantley, Anna
To:Cc:Subiect:Attachmenb:
Wick, Fred;Hornbrook, Frank; Monis, John R.Morgan, Steve; Pelz, SusanSarasota CCSWDC CLI LF GAS RAI #1 - 1-29-2009.pdf -AdobeAcrobat ProfessionalSarasota CCSWDC CLI LF GAS RAI #1 - 1-29-2009
' Florida Department f
Envi ronmental ProtectionSouthwest District Office
13051 North Telecom Parkway
Temple Terrace, F lorida 33637 -0926
Charlie CristCovernor
ieff Kottkanrp
Lt. Correi-nor
Michael W. Sole5ecretary
Mr. Frank Coggins, ManagerSarasota County Solid Waste Operations4000 f'nights Trail RoadNokomis, Fl . 342'75
January 29, 20Q9
RE: Central County Solid lfaste Disposal Complex, Sarasota CountyPhase I Gas CoLlection and Control System ConstructionPend,ing Permit No. : 130542-009-S0/08WACS No.: SWD/58/51514
Dear Mr. Coggins :
This is Lo acknowledge receipt of the permit application prepared by HDREngineering, Inc., dated December 29, 2008 (received December 30, 2008), forconstruction of a landfill gas co1lection and control system in Phase I of aClass I l-andfil-I, a.t the solid wasLe management facility referred to as theCentral CounLy Solid Waste Disposal Complex.
This leLter constj-tuLes noLice that a permiL will be required for your projectpursuant to Chapler(s) 4Q3, Florida Stat.utes.
Your appli.cation for a permit i" llSorplslg. This is Lhe Depart-rneirt's firsLt.grr.ri- for infcrmation. Please proviee the information listed belowpromptly. Evalr.ration of your proposed project will be delayed untii al-1.requestecl iqfor:r.natj.on has heen received.
GENERAIT:
1. The requesr-e,l information and comme:rts below do not rrec€ssarily repeatthe information submitted by che applicant. However, every effort has beenmade to concisely refer to the section, Pd9e, drawing detail number, etc.where the informa.Lion has beerr presented in the original submittal..
2. Pl-ease submi-t 4 copies of all requested information. Please specify ifrevised information iJlntended to supplement, or repl.ace, previouslysubmitted i.nformation. Please submit al-l revised plans and reports as acomplete package. For revj-sions to the narra,Li',re reports, del-e-t-i*ons may be
) and addi-tions may be shaded q tr or similarnotat.ion method. This format will expedite the review process. Please includerevision date on all revised pages.
? Please nrovide a summarv of all revisions tc drawings, and indicate therevision on each of the applicable pl-an sheets. Please use a consistentnumbering system for drawi-ngs. If new sheets must be added to the originaln1rn aaF -r^-^^ ,raa f;a ^-*^ -,,mharincr svsf em with a nref ix or SUf fiX tOf/f qll -gu, PIEoDg uDv urrv DqItLe .LturruE!.!rrv rJ r Lerr! !/!v!r^ v!
'
indicate the sheet was an addiLion, e.g. Sheet 1A, 18, Pl--A, etc.
4. Please be advised that although some comments do not explicitly requestadd.itional- information, the intent of all comments shafl be to request revisedcalcul-ations, narralive, technical specificat.ions, QA documentation, plansheets, clarification to the iLem, and/or ot.her information as appropriate.Flease be reminded that all calculations rmrst be sigmed and. sealed by theregistered professional engineer (or geologist as aBpropriate) who preparedthem.
fi,'fare Frttitction. Less Ptoccss
u,rt"'v.de p. state. i!. its
Mr Fr:nle /-ncninc ,,.0,Sarasota County Solid Waste Operations
sarasoLa ccswDc ,h-"; cas system constructj-on
The following information is needed inIChapter 62-701,, Florida Administrarrve
Page 2 of 5
support of the solid waste applicationCode (F.A.C.)l:
l-. RuIe 52-701.320(7) (b), l'.A.C. Application Form #62-701.900(1) , Part B.l-:The narrative in this section indicates that the j-nformation provided in thisapplication supports the construct.ion and operation of the proposed gascollection system. Except as indicated in the comments provided below, theDepartment agrees with this sLatemenL. However Parts A.2 and A.3 indicat.e thatthis application is only for a permit to construct the gas system and the$1,000.00 application fee is only for a construction other permit. If theapplicant wishes t.he Department to review and process the information providedin this application for both a permit to construct the gas system and amodification of the existing operation permit to operation the system, pleaserevise Part A.2 to also check Lhe "Operation" box, revise Part A.3 to alsocheck the "Minor Modification" box, and provide an additional $250.00=nnlinar-inn fa6 with Vour response to this lett.er for a minor modificaLionpermit application. Otherwise, please revise ParL 8.2 to indicate that thisapplication is for construction only.
SECTION E - GENERAIT REQUIREI,IEI{TS (Rule 52-701.320' F.A.C.):
2. Section 8.12: The applicant entered into a ConsenL Order with LheDepartment (OGC Case No. 08-1728) on october 8, 2008 and this case is still^han Dla:ea rarrigg the narrative in Seqtion aCCOrdingly.
3. Section 8.13: Pl-ease publish the attached Notice of Application andprovide proof of publication to the Department.
SECTION H - I,ATiIDFII, CONSTRUCTION REQUIRETIIEIITS (Rule 52-701.400, F.A.C.):
4. Section II.1: Phase 2, Cell 1 consLruction inc]udes the installation ofan overlay liner on the western slope of Phase I and operation of Phase 2,Cell 1 includes additional waste disposal on this slope. It therefore does notappear that instal-lation of the side slope trench collection system can bedelayed until Phase 2 of the Phase 1 gas coll-ection system construction; thatthe header pipe system on the west slope will function as designed under theproposed Phase 2 expansion (i.e. Condensate Sump S-1-, knockout pots, accesspoints); and that Phase 2 expansion on t.he west slope of Phase I wasconsidered into design of the side slope trench col-lection system or theheader ni ne swst f La t.raats -l nna P'l ease rreri frr and rerzi se the narrativeI,rye rJ r ueltt 9Il LIIe weD L D f vlJs v er r !-),
in this section and aII other applicable sections of this application (Seeadditional comments below) to discuss and address these issues.
SECTION H - LeNDEII'L CONSTRUCTION REQUIREMENTS (Rule 52-701.400' F.A.C.):
5. Section M.1: The list of parameters for condensate sampling in thissection aoDears to be inconsistent with the list of parameters for l-eachatesamnl ino in .snecific Condition #E.9.b. of Operation Permit L30542-007-SOl01-.Please verify and revise this section, as applicabfe.
Mr. Frank Coggins, l.l.n$tSarasota County Solid Waste Operations
SarasoLa CcsWDc pfr."lcas Svstem constructlonrqye J vr v
SECTION O - GAS MAIIAGEMEIIT SySTeM (RULE 62-701.520, F.A.C.):
6. Section O.1: Please revise this section to discuss the rationale forthe side slope trench col-lection syst,em design, as applicable.
1. Section O.4.d,:
a. ft would appear that condensate sampling from a condensaLe sumpadjacent. to Phase 1 would be more representative of condensate qualitythan at. the condensate sump selected. Please explain the rationale forthe proposed sampling locat.ion.
b. Detail- 5 on Sheet D-04 specifies a 6" blind flange access on thecondensate sump. Please verify and.revise this section and/or Detail 5on Sheet. D-04, as appropriate.
SE9TION B - ENGINEERING REPORT (RuIe 52-701.320(7)(d), F.A.C.):
8. Section 2.0: P]ease revise this section to discuss the rationale forthe use of side slope trench collection system on the west slope of Phase Iand address the issues raised in Comment #4 above.
9. Section 3.0: Please revise this section to identify the side slopetrench collect.ion svsfom aq a.^mponent of the LFG syst.em, as applicable.
l-0. Section 3.1b:
a. Being much more pervious than the gravel layer, it. would appearthat the use of a geonet may create a preferential pathway for gas abovethe perforated pipe. Please verify and revaluate the use of geonetw/geo.textile and soil- rather geotextile and soil as a barrier bet.weenthe gravel and bentonite.
b. Please revise this section to specify whether the geonet will havegeotextile on both sides (i.e. is a double-sided. geocomposite).
11-. Section 3.lc: Please revise this section, as applicable based on yourresponses to the issues raised in Comment #4 above.
L2. Section 3.3 & Appendix A - Condensate Generation Calculations: Minimumlandfil] gas temperatures of 50-600F have been assumed in condensategeneration calculations provided. to Department for oLher landfill gas systemproject.s. Pl-ease provide the supporting reference for the assumption that theminimum temperature of landfill gas is 860F. and/or revise these calcul-ationsaannrd i na1rr$vvv! s+r.Y !J .
13. Append,ix A:
a. The calculations and models presented in Appendix A were onlyreviewed as they rel-ate to the Phase I gas coll-ection system. Thiscormnent is for information purpoEes only and does not necessarilyrequire a response.
b. Ring Deflection and W4ll lggl(ling: Please provide additionalcalcul ffection, and wal-l buckling forj- ha narf nretod ni ni nc 'i n i-ha qi dc q'l nno l- ran.h qrzql- am and f nr ri nryr!/rrry D rvs p rvy o_)' p uerrL qrrs lvr f rrry
deflection and waIl buckling for the header piping on the west slope ofPhase I, that t.ake into consideration the overburden pressure of thePhase fI expansion.
Mr. Frank Coggins, t"nttSarasota County Solid Waste Operations
sarasota ccswDc nnrJl".s svstem constructionPage 4 of 5
Appendlix B - IJFG System Desigm F1ans (Rule 62-701,.320(7 ) (f ), F.A.C.)
Due to complexity of the propped design and Lhe difficulty in the describingsome Department's comments and questions related to these drawings in writing,Lhese drawings will be discussed in detai-l at the meet.ing requested. at the endof this letter. Please provide revised drawj-ngs that address the commentsprovided below and at the above-referenced meeting, including a1I necessarydet.aiLs for the construction and operation of the facility. The d,rawings willbe reviewed in their entirety after the responses to these requests forinforrnation are submitted.
14. Pl-ease revise the desigrn plans, as applicable, based on your responsesto Comment #4 above.
15. Sheet C-03;
a. Detail 5 on Sheet. D-04 indicaLes that the 4" condensate force maingo to the leachate lift station, as shown on Sheet C-03. However it isunclear how or where this is shown on this sheet. Please verifv andexplain and revise this sheet, as applicable.
b. Please explain and clarify the orientation and function of theconnection to the l-eachate cleanout and connection to the existingLeachate sump, as depicted on this sheet and detailed on Sheet D-06 andrevise this sheet and Sheet D-06, as appropriate.
16. Sheet C-04:
a. Please explain the reference to "Remote Wel1head" on this sheetand the reference to the "side Slope Gas Trench Connect.ion Detail" onSheet D-03 for these we]lheads.
Li . Sheet C-05:
a. Please verify the orientation of the north arrow on this sheet andrevise this sheet, as applicable.
18. SheetE D-01 bhrough D-05 and D-08:
a. Please revise the details references for t.he details on thesesheets to reference back to a plan view sheet where the locaLion of thedetail- is shown.
La- Sheet D-03:
Detail- 3:
'l ) Pl ease rerri se f he sneci f i cat i nn nf t- he aanfsxti]e to beL t erru ,yvv t
consistent with the geotextile specification section provided, asapplicable (See Comment #23 below) .
2) Please verify the apparenL reference to a "varied" pipe sizeon this detail and revise the detail, as appropriate.
Mr. Frank Coggins, trrr;tSarasota County Solid Waste Operatibns
sarasota ccsWDC rt."!l".s System ConstructionPage 5 of 6
SECTION 3 - LFGCCS OPERATIONS AriID MAIIITENAIICE PIAI{ (RULE 52-701.500, F.A.C.):
20. Seetion 5.2: Tt is t,he DeparLment experience that 1andfi1l gas veryquickly accumulates under a geomembrane final cover system when a gascoll-ection system i-s turned off and qas is not allowed to vent. This can causet.he Liner system to displace the soil cover system and bulge (aka landfi11whales). Please revise this section to provide procedures for venting of theIandfill gas in the event. that the system will be shut off for an extendedperiod of t.ime.
2L. CCSVilDC Operations Plan - March 2008: In the event that the applicantwishes to include the minor modification for operation of the gas system inthis application (See Comment # 1 above), please revise the Operations Plan asfollows:
a. Table of Contents: Please revise the Attachment section of t.heTable of Contents t.o reference the LFGCCS Operation and Maintenance PlancLs cill aLE.acnmentr E.O trne Upefatr].onS f:faff .
b. Section L.2.h.: Pl-ease revise Section L.2.h., as applicable todescribe the proposed Phase I gas collection system.
SECTION 4 - Specifications (Ru1es 62-70L.400(3), (7) and (8), F.A.C.)
P1ease revise the Technical Specifications and/or other referenced applicationdocuments, as appropriate, to address the following comments and/orinconsistencies. The Technical Specifications will be reviewed in theirenf i retv aff ar receinf. of th'i s information.
22. P1ease provide a Table of Contents for the Section 4.
23. Pl-ease provide Technical Specifications for the geotextile andgeocomposite (qeonet w/heat bonded geotextile) proposed to be used on thisproj ect .
24. Section 02130 - Vertical Extraction Wells:
a. Part 2.2: Please revise this part to incl-ude the seonet,-, i-^^.^-,-:-w/veuLE L'1e or geotextile to be utifized in t.he extraction well, asapplicable.
b. Part. 3.2.C.L3.: Please verifv and revise the qeotextiledescription in this part, as applic-.nl., based on the provided geonetw/geotextile specification section (See Comment #23).
25- Section 02135 - Side Slope Excavation Trenches:
a. ParL 2.2; Please revise this part to inc]ude the qeotextil-e to beutilizea in ttre t.rench.
26. Section 15050 - Pipe and Pipe Fittings:
e pressure drop failure criterion in this partappears inconsistent wit.h that provide in Part 3.5.A of thrsspecification secLion. Please verify and revise accordingly.
SECTION 5 - FINAIiICIAIJ RESPONSIBII'ITY (RULE 62.701.530, F.A.C.):
27. Gas Control: Aetive Extraction:
a. Please provide the calculations and third-party quotes utilized insrrnnor1- of tha rrnit costs orovided in this Section.
a. ParE. J,4..F: 'l'n
aManagerid Wast
IMr. Frank Coggins,Sarasota Countv So1
SM/ sgmAttachmentscc: Carlo
FrankJohnSusan
Sarasota CCSWDC Phaa Onpr:fi nnc
lrrY, rrrv t , rLo. lebron@hdrinc . comHornbrook, FDEP, Tallahassee, (e-mail)
Morris, P.c., FDEP Tampa (e-mail)Pe1z, P.E., FDEP Tampa (e-mail)
Gas System ConstructionPaqe 5 of 5
Please provid.e aLl responEes that reLate to engineering for desigm and,oBeration, includ,ing plan sheeus, sigmed and sealed by a professionalengin€er. Responses that relate to the facility operations should be includledas Part of the Operation P1an. All replacemerrt Bages shoul-d be numbered, andwith revision d,ate.
Ehis staff assesErnent is preliminary and is desigmed to assist in the reviewof the application prior to final agency action. The conunents provided hereinare not the final position of the Department and may be subject to revisionpursuant to additional information and further review.
Please respond by the date established in the meeting request.ed. above,responding to all of the information requests and indicating when a responseto any unanswered questions will be submitted.. If the response will reguirelonger than the date established in the meetingr, you should develop analternat.e specific t,imetable for the submission of the reguested informationfor Department review and consideration. Pursuant to the provisions of Rule62-4.055(1), F.A.C., if the Department does noL receive a timely, compleLeresponse t.o this request for information the Department may issue a finalorder denying your application. A denial for lack of information or responsewill be unbiased as to the merits of the application. The applicant mayreapply as soon as the requested information is available.
You are requested to submit 4 copies of your response to this letter as onecomplete package with an original and three copies of all correspondence.Please conLact me at (813) 632-7600 ext. 385the Department to set up a meetinglo discuss this letter and subsequent submittals.
Sincere
Steven G. MorgSolid Waste S
Sout.hwest Distr
62-L1,0. l-0 5 (5 ) . Notices : General Requirements .
Each person who files an application for a Department permit or othernotice as may publish or be required to publish a notice of application orother notice as set forth below in this secLion. Except as specificallyprovided otherwise in this paragrraph, each person publishing such a noticeunder this section shal-I do so at his own expense in the 1ega1advertisements section a newspaper of general circulation (i.e., one thatmaol-c l-i.a ram'i.rements of sections 50.011 and 50.031 of the Floridav\4qr!vrrlvrrue v! osgurvlrp Jv. vf f qlr
StaLutes) in the counLy or counties in which the activity will take placeor the effects of the Department.'s proposed action will occur, and shallprovide proof of the publication to the Department within seven days ofthe publication.
62-1-L0.106(6). If required, the notice shall be published by theapplicant one time only within fourteen days after a complete appl-icationis filed and shal-l- contain the name of the applicant, a brief descriptionof the project and its location, the location of the application file, andthe times when it is availabl-e for public inspection. The notice shal1 beprepared by the Department and shal1 comply with the following format:
State of FloridaDepartment of Environmental Protection
Notice of Application
The Department announces receipt of an application for permit to consLruct- 1 -..l€.:-l-lq rqrrs!rrr vqD col-lection and control system, subject to Department rules,at the solid waste management facility referred to as the Sarasota CountyCentral Solid Waste Disposal Complex, located at 4000 Knights Trai} Road,Nokomis, Sarasota County, Florida.
.F] .ic annl .ication is being processed and is available for publicinspection during normal business hours, 8:00 a.m. to 5:00 p.m., Mondaythrough Friday, except legal holidays, aL the Department of EnvironmentalDrnl- aar-inn c^,lthwest District Office, 13051 North Tel_ecom Parkway, Templev+vrr,
'I'errace, t, Ior].da J J bJ | -u9 2,6 .
Pelz, Susan
From: Pelz, SusanSent: Tuesday, November04,2008 8:27 AMTo: 'Lebron, Carlo';Zell, DavidCc: Siemering, Richard; Franklin D. Coggins; Morgan, Steve; Morris, John R.Subject: RE: meeting minutes
Carlo,
Minor point of clarification-
#15- While the Department does not object to dewatering pumps in all of the wells, we don't necessarily "suggest"
them. We have no opinion on whether the County should or should not use them. lf they are included in design & notconstructed,nomodwillbeneeded. lftheyarenotincludedindesign&laterneedtobeinstalled,amodmayberequired.
lf you have any questions, please call or email (email is better).
$usan J. Pelz, P.E"Solid Waste Program Manager$outhwest District
13051 N. Telecom ParkwayTemple Terrace, Fl. 3363781 3-632-7600 x 386susan.pelz @ dep.state.f l. us
From : Lebron, Ca rlo [ma ilto : Ca rlo. Lebron @ hd rinc.com]Sent: Tuesday, October 28, 2008 6:10 PM
To: Pelz, Susan; Zell, DavidCc: Siemering, Richard; Franklin D. CogginsSubject: meeting minutes
Susan/David;Attached are our meeting minutes for your review and comment.Please let me know if I misunderstood something during our meeting the other week.Thank you.
Carlo Lebreon, PESr. Project Mgr
HDR oNE coMPANY I Many solutions200 West Forsyth Street I Suite 800 I Jacksonville ,FL | 32202Direct: 904.598.8928 | Cell: 904-535-4812 | Fax: 904.598.8988
Tracking:
n""ipi"n1O'Lebron, Carlo'
Zell, David
Siemering, Richard
Franklin D. Coggins
Morgan, Steve
Monis, John R.
n""a O
Read:11/4/20Q8 8:30 AM
HXI I oNc coMPANYI I-lr\ | Many Solutions'" Meeting Notes
subject Qsnlyal County Solid Waste Disposal Complex Pre-Application Meeting
Clienl Sarasota County
Projecr lsnjfill Gas Permit Application Project No: 85237
Meeting Date: October 17. 2008 Meeting Location: FDEP SW District Off ice
Notes by: Carlo Lebron
& Forms\Foms\lrleelingNotes.doc
Attendees: See Attached List
Topics Discussed: Solid Waste Application Permit and Air Construction Permit Application
Action/Notes: The following points were discussed and agreed to during the aforementioned meeting.
1. FDEP has no objections with HDR using proposed final grading plan for Phase I.2. This permit application is only for the construction of Phase I landfill gas collection system (LFGCS).3. Two sequences of construction for Phase I (the first for wells at elevation 80 and the second for wells
on the top deck).4. The LFGCS in Phase I is sized for the capacity of the current permitted landfill.5. FDEP has no objections with side slope wells located between the intersection of Phase I and Phase
il.6. The condensate forcemain outside of waste does not have to be dual contained7 . Condensate can be disposed into the leachate collection system, preferably on the north side of the
landfill.8. The FDEP is not concerned about specific orientation or layout of the flare station but more on the
certainty that components shown are installed. A note stating what is shown is a general arrangementand actual arrangement may differ.
9. The FDEP requires an air construction permit be prepared for the installation and operation of theflare station. A revision to the Title V permit will be required to include the flare station.
10. No need to show detailed electrical connections. General notes and a description showing connectionwill be sufficient.
11. FDEP requests design drawings showing how disposal of condensate will take place on the flarestation.
12. FDEP requests only upper 213 of solid waste column be penetrated with vertical gas extraction wells.13. HDR must present pipe strength (crush) calculations, specifically crushing based on weight of
equipment in Phase II area over side slope wells.14. HDR to provide clogging calculations for pipe perforation versus non-calcerous stone for side slope
wells with permit application.15. FDEP suggests including dewatering pumps in all wells of the LFGCS design, (if not needed it is
okay not to install).16. FDEP permit application form will be "New construction other".17. In order to operate the landfill gas collection system we will need to apply for a minor modification to
operate. The minor modification can be submitted with the certification report.18. There will be two separate certification reports based on two separate construction events for the
LFGCS.19. The solid waste permit application should include an updated financial assurance (FA) document.
The updated FA will note for itemT under closing costs passive vents will be for Phase II only anditem 8 Active extraction will be for Phase I only.
20. FDEP suggests HDR to reference "Pending" Phase II permit application where appropriate.21. Provide documentation of methodology Kentucky (KY) pipe uses along with inputs and outputs.
200 West Forsyth Street
Suite 800Jacksonville, Fl 32202
HDR Engineering, Inc. I Phone (904) 598-8900
I Fax (904) 598-8988
I www.hdrinc.com |
**'"'
22. The Central County Solid Waste Disposal Complex will need to submit a Title V permit renewal by10/2612009. This permit renewal can include information on the flare station.
23. Identify deviations from design on certification form.24. The FDEP has no apparent issues with the proposed final grades within the top deck of Phase
5 percent cross slopes and 0.5 trench slope).25. FDEP will allow an exposed geomembrane cover (EGC) along the south side of Phase I as
"Temporary Final Cover."26. The Phase I closure application should reference the "Pending" FDEP LFG permit application
appropriate.
200 West Forsyth Streel
Suite 800
Jacksonville, Fl 32202
Phone (904) 598-8900Fax (904) 598-8988www.hdrinc.com
HDR Engineering, Inc. Page 2 ol 2
(e.8.'
where
Florida Department of
TIME;
4{'}7'l
l(;'J
Charlie CristGovernor
Jeff KottkampLt. Governor
Michael W. SoleSecretary
SUBJECT: a,str1ltr"|it {:irnl,fi- {" A"f!':it LL
Environmental ProtectionSouthwest District
13051 North Telecom ParkwayTemple Terrace, Florida 33$7-4926
,^i,1-..-,{..-.t, r f 7, r,+:.DATE: U\, tl,rct_ t 1i {r.I.,V
LOCATION/CONFERENCE ROOM :
{,.L. $,6:oncc'/is t-
, . ,tr il) ,.g( , a, r
NAME
rilt\r\A^-' f// | I
ATTENDEES
AFF'ILIATION
jl." { , I
UL | ) -JLt-.t.
['r:* (,', , i i4,;,2 ,.l,r ,frci.]
"More Protection, Less Process"
Printed on recvcled oaoer.
TELEPHONE NT]MBER
(13*6 i L *7bc,(.. x jt''a
2;:r r":5 l "\(,,A) y -1 * t"
X //B
4o./Stf 81D D
t't'Z LG,'L 27"7C
? 8b1'1i7)
I
I
\6?,srf,,L,. P.r^,t'i'5 '' X\.1.CDAP 4i€ c<,ta?4.4;st'.rt ," //6
;l''tVltt' C V
Pelz, Susan
From:Sent:To:Subject:Attachments:
Susan,As requested, attached is the agenda for the pre-application meeting we are scheduled to have with you Friday at 10 amin regards to Sarasota County wanting to install a landfill gas collection system at the Central County Landfill.I appreciate the Department accommodating our change in the meeting time.In attendance will be:Frank Coggins, Sarasota CountyRich Siemering, HDRCliff Koenig, HDRAshley Barker, HDRMyself
lf you have any questions please feel free to contact me or Cliff Koenig (904-598-8931) at your convenience.Thanks
Carlo Lelcrcon, PESr. Project Mgr
HDR oNE CoMPANY I Many solutions200 West Forsyth Street I Suite 800 | Jacksonville ,FL | 32202Direct: 904.598.8928 I Cell: 904-53 5-4812 | Fax: 904.598.8988
Lebron, Carlo [Carlo.Lebron@ hdrinc.com]Monday, October 13, 2008 B:43 AMPelz, SusanPre Application Mtg for Sarasota CountyFDEP Meeting Agenda 10-17 ver sent to FDEP.pdf
ilG*.
M L,O[7€\CENTRAL COUNTY SOLID WASTE DISPOSAL COMPLEX
PHASE I GAS COLLECTION AND CONTROL SYSTEM DESIGN
PROJECT PRE-APPLICATION MEETING - OCTOBER 17, 2008, 10:00 AM
AGENDA
Brief discussion of site background, current activities, and overall project goals
Discussion of Permit Application Requirements
o FDEP Application Formo Engineering Report
o Design Calculationso LFG Design Planso Financial Assurance Documentso Cut Sheets (Necessary??)
o Operations and Maintenance Manualso Specificationso Advertisementso Additional Information
Discussion of Approach to Gas System Design
Schedule
o Miscellaneous Items
HRCENTRAL COUNTY SOLID WASTE DISPOSAL COMPLEX
PHASE I GAS COLLECTION AND CONTROL SYSTEM DESIGN
PROJECT PRE-APPLICATION MEETING - OCTOBER 17,2008, 10:00 AM
AGENDA
Brief discussion of site background, current activities, and overall project goals
Discussion of Permit Application Requirements
o FDEP Application Formo Engineering Report
o Design Calculationso LFG Design Planso Financial Assurance Documentso Cut Sheets (Necessary??)
o Operations and Maintenance Manualso Specificationso Advertisementso Additionallnformation
Discussion of Approach to Gas System Design
Schedule
o Miscellaneous Items
\tttv\rtttiI,t{t(31"t;, L.rF,{*c,
[,r^r fo,tu,u:
tl
r",/ r'T f ;9,
I
:i
i
i
- rt:rrrdffdf ,{ hr'*)-Yf,n-"""r <,' ' t€'ft'f-.L{c!'J iP rL
-..t ,lrlr.:5i i l,'ri;5r. J ir"I
. ,--a lt.4I u'!rY'rl
F'-,:- ruir",i fl; ',T, a,iQ"rr
)
. /xhlc ;i.,it.,;r;u .- 4*u- i;i"11
ry\',lUit ('rx,'t,.',fu r.,$u:.F.- -C* (1.:i[.a1,-j iffir,t t'i,- iffvrcnm{ /-Lzrdi
- r..1,,'i1', fli/r_=ir',,:-.:1: jri4;-;irJ'l)
- M f.r;,,;i{,.;,, ;or' ,"; l-;: i,,. ,-:i:'tLi .,,r:L F:ii:. t/,ti tt.,t4tii:{v1L-rir ,;,ft' G,{5 rter<rvut1 (xsfs'nla*':)
z L:,i!-;l1'. )Ltr,/,ntn-?*;* f,,i'l)L{ '' fr.ft,:rl-r') lr: I.i{*Jiii.Crl scffi:FJrri {ftL i'iit:i'*,r- r;eO,ff 4^7u"'; l;z )- ;r.l,rrc $i'r;/l'i-i b{5 ,;i:r,}iiL{ f't')ir,,"t :4rtr.:ef i{ c:{i fi#-fii'li t , n. ;1:i 1l- i;e
t,irt;lJti'. .*.. T-t5, f{:tii" i;].$a.;;i:gruar.}1} i,rri'r=iu rlu,}.';ui.f'.
* t"'it' ;r*;r ,{Yi'Jd {*),,i fr:'!.}f-i !i-i*-; ir;r1':1 ', l,;n-{ i,-i' ,r',,;.lto&f. I r.u;ri .CJ€ i;,-ltttt
6;19.. l:e iicr;,irri'al:l 'iv i.t-r.Ltt,ts'ri:''n:l- f:u', i'4.lit-l}{ .i.r Jl.tt\qe:;f 'flffa';*f-J-
- ha.', r i,ro f: ," ,i ei I ;Ji'> ;r ..- -'r ;-;:1;:i.i .-'; fr r*f1 .ir';- 1i.:L;;;'r';:c' il.,.1;r,r-i r;U> ;tt:J fmns ,
lli*iry"ri.#:1 f,.iNr,i..n {."ii:'iiii:,""t.- t{}t( iY !8,.. i,f l:,att* ii"'rd';r,i*rc' vf
T> F..'.+11" lJ"bl.{fk}tJ ,,ili".-rt .-irl;ii" lirr^;: t,:i,rt*r,1,-.-...t ft ttis Si::Il}:tt
* 'fl,;gt:;,u,' y !i.l ':r*{' (fri t'1 ,;-,tJ''' '!rXi'itl.; ilt?f-€ i:,*.\-d CO1flitte ({\ill'4*7c,
lAi:"lik le''-*2lf:l'^' d ti*i
/lli
\
- s s r':lrfl :;; ,-:1,1;.:: i;,{:, i'.,-:ri;rr71..'i ;lr:,:i,f\ lif !i.-r {.f "u*uii [rt],":-tt
!r-:i,i:,r i) ir1:';c. .;(' i;;\s d13-?;/j'e-7ii\j i,rriZ.i-r, ,T. t,t9\ 'ryif .::f' {)n {p;'l ';
iti,r,.u'i- t|i{L,lffi,r"* r-irr i, r ,r, .- .,' ;ft i fiiilij; xi' (da S{!i"r:r'l t.}r:i.i..,'itc:lilcJ
Qc-rrrrrli ,rl i".'t1*, '; .'fr.rrr':r'C1
,,.1,;;1 i1.,;*,rt. ll,"iq6r.$[0-S5ftg, .I.,J |..,.," r.1 Z0t,c
'-.it-:+r';3 pA L*,1r ir*.'t:?:. s;;r"i-. i-:c f?U.g'*i 'LJ': t fi.;- ic'i+rr,frlrt
gJ 1:;li"r1r* i15re n{
t-:"il;?n;l fi:;i c;r;;,.i;r l)*"1,i+ {
;,,fi'; f.,;:u:-) l" i*i.C,,,* "i"i;' gc,:41r,r J
ir:rr.r,Cflrv \ l5'il]i p*ni.
-,1*.-,lr'i-1 tr-ib jr'lr;: "ili,
iy.;-!),,;sii- 1i;i;; ;, g,_;16,j
ii :,ll{1.:irri* ;'ii,;. :.ii:-'-
- t'r,er;*. L^: , tt .':g i,ir, :'ts
-- a:::l :,{;.*.rrf fi:::.. fil4,';.,';,iii.J
t**:it. ;.:.r, :-}? i.;:,:Li'
t.!!T"}}}t. q.,,ria. irli..- ,
i t- Ta , \- t)-
,',:t,J L ;-'t"",' r\'f:,
I p ar,".,i;,'.,,"nnl S;tiS 4
i.;rrt;4rc btt;kt*A
"r^ i,::.,,.\ rui) .;F t-,"- ',t1:;fcl4 I'l.ttx:&.'ft*,) tahy
t{ J{;,x F!7L:
\s?.\
-, !#.rt'irr* {rxl;f- - *f6 iFltrtlil;'J ;rrr*it i,;g"t1i{ir-'tr-ifk; t'iT&
ittt",i; liffi,'rI'
f, irli*il{rr:::i;f ;,{ l. 1,-,'ra- ;'1,.t.,-.41l,g,. f"li.n',- !.ffllyt {fit;'-{'r,!>'Ug{,.r,.1;tn"lX"?
,if {7,"r'ir. lTrr',.^' , f r,N*. ,l*,: r.,:),;i- f*li:-At'.r:';;:riL.6.,^{,. l,lL-cJr7-r f;e
i1,,ing;1r,1 .-1.i..;i-'* f.';r*.l,fi;l"i * {1 .rrli:*,,11r,:.-t (:l i",tai(1i'.-:6jis il rv;'f
Sr: tr'-iflt-$L.
LY;1*r'..,,,. 1..{.r.i ir'.l*r-- ,.'iifllri \;tfi 1r,,1,'715;,*O 7,.rii {+rx-,:* i;1;'t-;'i1,1;;; gri've{v,1.6,1 SercffC)
:lr;t: i:7',1.; rr..r5 'r;1 {..,r,f :;.,,i:,,.i,'izil!) ,t'iit, i TD {,:;':i,.t'.-r'iff.c,.iJ 'ft-: Sfez") iru:
IliYLl.,,i) T},f ..,.u r)- r;r'jrtt.irj!)
' *i,..;. Lfif ilJ,' 'rir'i: >'fri(..rrft{ (.;n.&-:, l-;. iiil-rilrr-i i:,Jri.r,;:i;rgr'!i i..;,rr ti .54 r-rJrj?* igl; li/: f t.{t
- t i.u\'t,t lr,r:t;?;,q ittr:.r-itj.-'nr!{.: !,.,*' i:elw",i.f-*,* ;,t i7;itt'jIt* l1 y\v
- iltif,J.v,-li .':.,,'ti: ,rJ,:.i- i-:,-.. { j,:,,*{l.al-' ;p (iJi J,.."ir-t- t!r.{{'.} ,/^'/rl ,\->,:,:1-:rr. *.,nizrcq,,t
"j tr/:ti1";i* r"lgtt: |
.,.11.., r::,- -. l"^)),,i ,r-, r,iJ.r:.!l .r;> 'i'i.(.
s:.i: fa,.rr.i'\ {r. entqt; rJ
1ql5 fl.4e'"r rt:f:,,c:i-'F> r*i-,-,;i,€- i)c3,t'^, fii;'- it;t'('. 1.' & tu.{-"tl){ r- $f ,;ar(tLL-
ilSr-t & 1) ;{rro,,lt:'1t* .^- :4"71.'-, .tf /v..111pr'.E: 6''iiru,"'f-L!-i-i-i 'J:rard li r;fr-i.r+ds rtl:{t
\' ,.) \.-la'- i{:l l'"' tl' ;+' 'il /g.i ''r'r '- l! r.fl''v: )
'i/,t"\ t -. .. r^;f ,| -w;.\.)r'i\i r'r^r'..,!;t"j'i]-'{,it,* lbf- ,ll,'t i;'i,'l
L- ll''r:l ir,'r':t,-- it!" tY:i::fi * f:tf-il il';!t,,c'--a
li*rt.rfli-f. \q,{lrrlrT"fli r;r r.irll. ;1r.}r::r" l.,,L l- L,.il+ !Cr.ili d{\r d ;,i-rf- ',,}fi'Lrct1,x:)
.fi.a,.-',6,1 fic,t- !'yrr')
'r,*; i'i1.,"i ,5:- {-i,r;\;v'.l'i'i.,:i{rr** {it,: rtp) i';,:,3r"e cnp. (7Ci:n.)lt,-rl,
,Ji''Jt']1.t,i ;It i;.t':; !31':'?,:.t:I..:1.,,i.,,::t,,t *-:ii:i;t)ir.; l;L. 11.{ri}'c' f, r,,ii,r-//l fi.;t;> .iu L1l5 ?Cl{./Wi
i-,-,1:',,.:lf 1:31.,,xi:f [d:,.. i/*4;; J ,,i.u,i'u.i *s, t r}: \;i:'\rraT|:" IUrury ti yttfef*
.-(tr,iif ii.rj,-'IJ*a, ;tit L;,j';r:-'p*;L &t5 r Ji..i,ijr/rr-i itji-l-1,{ iiii;:r1i/i lee Vt tL/t"li Tv
lui::.^ail lli,r- i,{lr!-l'L ,,1,r,) ii:,i. i.,r: i*t,;,.i-' f *,,* ti.-tis 'Z- 4{i,rlirl ;r<c:C! i,;,( 7- 9r'.iffi4/f
* fi{Ji}i,r;;-- ;i).Ji l.ji,;
. i -- ,rii.F- itrr-t. * i-cf LYlt i l,'
-rC51; '.i.1'r,. I"rrl J'i
;.;,'. tzfrj ' ', ilv'- -7 n)
o
,irt.L l';t''f\*i: i nt "',1;: :: €(,'i,te{"(
{.rJ*"::tf4,i;-t:5:} r{ tcl,.;'t{td: 1r6:.;y i-ltJ i:"{l.ie(e
i,3"13
rr 4{1fX, I}*. rtr.'iliri1 iTtLr'{ i:tt-it1';T
- Iis.',,r7tt 'i o"'P@#- iin- \i,f;:;tc'"r-!'7!11*:{ f* {'c l.x{:da"*rct)
SiittfufI
. .jal"fl*i i :''t 1".; " !.L. (cn/t:
{;{:'N1;'J CCA )l t,:L:1iT1,i.1't*u*utl€7, i:: "Jr1/'it :f'
ini lre' tr,;;,tnE {f{ut--f-'ilta -'i?;
.:
": {"r-r):;;if *r'it-,.;n'7i:.4 i.,ti f*+c'l,-]
, itli-lf rU '7- i;f,..?- ,-,rdrj{: :'tad-rr,i'>7 f+rta"g *,iiioel- *:rrlui;:li) *a,'i;fa'dt&&'r:t i Y $" rt:rnixap| fz-xr'-' i9,9L t'ttrL-
- f *,\ ix &r;l *.nl' i:tt,L-. ;f ",rfu *.if i'alxi-i :riii'tj':i1lG. {,n.t: {a:'c V{uft-; €K^'S
- l7lr...ril'.ri i:;:;;gt"x -iu.u .C ,6- {4, y;:-p,q) fUr,,.u,"y,.(1t€, -iz) :;ftF tftc'
'i-)i u {',.ir.i{-
tJt*t- i.','1",8i lltft&5,'79, t,tt".i:,i',:-r'i'l*il5 lr'1: lr1.lll1 tii-: \-rti:':k''Jrlry:!'- t'{{' ?r^e* l*rcc.
-fi*f .:r,,'Cfai, "<,''rT::i i'':;;":t; 'vl(."4.v: ,\r't),i,i:ti';t' :tr Yli'{ l;;st't-tsy' --0L
I
{&,'r,liry ilil'i.
'"- t^iS\i';'
- r*f[f
,/r1'
* 4 r'i rl,\s* *
o'/*n, d ,t / ,.j ,t,r'/il
J I J..{{t{w./lo/L( 7 1, d, ,
#:' h,,F/ tz ,2a.1,f7-tztz^S'
d(( /{ l"/ 0,, 1! ,",, l,n tJ
,,', '/ r*S:r:197a ,go ,' ,r/ { t7
t -r-/ ekat ///r'u f
/jile:./ /r-,r,'',/
f ,,"*,
/", /r/ ,, / . {'n // t)frnrs
5
Mffv -- ,,..: 'u y'e
o'i,;'&'
({"Silt t't <
/"2"r",""o*
*,..u1
^/'{ 1r...*"
jt
'fut?";; {'i
/'i{j
+:, 't .
-)r(t{',
.J-)rt(A';"
'f'.'
f),Yt
{
IT.
V
'L,"\.
;1 t(
ct (r.1r2-
{r*fr . r )/ / /.(a,a fi., , /rr
//,/ tuffT-;'/;</
145 \/t
-/fs: / t'l t'' 4" ,arr"r."/ rt
nct
I,, d), ,.,-
A /,,..
4r.,'
, a(
i ft"E-l-n'
.. J- -/4(/.4r./J't'( / /ltt""^
-rA,,
Jrn r,)
i/v -. ,',{ n
/i,t ,'l 1, :.i..
'ziar{.,.','l ,
( t:(' 4.'/'*,
(.
.. #rr, "r//
/, i,. *.,,..1 €-- rT f {4,t s/ 7/t*r-r \
'"V'" "/ ( 4^ )
{ t,,,,, t,.,t;( "
'/ g, /, + ,t'.r7'/ is 6rr' /t*L
,'nLl ",
L;-'
t:' *r rlr u ,r/r-
*/-,,/ -
t'{- r.,-'r,'t'ti7d +t t, +,::(."{l t ffr/
/J
-{ Ltt '/" ' "" '
{'I
,r/,,, oL ( /- , (r,/
| [ u,;f {s * fi,r / *ef / /v& ( t' ",1'ltdf/{rn r,, /,
{, A- /t.ut,, t"l-pr"l,:,,'*/.; t-; rt.,'i;*;,'*i, ; ',*i l,;
: .i:{, r ffi/,"€ r
iy,*,/i,,4-{'t 5 {=,--- /i'afr/z'
/,)/{)'( t '!
A .{ 1=/&An / .r ny.4.r,"'i.-rc-l 7?
,' rl".
,,\. !,ttLt 7\:.
/t
.. /(/?(,ft, ir//;//;f
i/ r /l-1; . I Jt,.fffit "' 1't tLltil 7,t I
'+A, .'1, tz't7 ////
S'V*^-4 /Q
_-i- ), ,Ut/
/Lz'L )t/,n3 It I l<,s-r,
.L- ri t",i,.
,.j,
/ ot
{
/7;(i{ .
t{<.ge(' ,,.r,4.r-{*n,,./r:i/,? -a^.
'{, # T,<;a:i7Ug :+ ,4;{-" f rti'
,1, /,ti Zstt .1,&" , ,.u;l tc
fut 'ilr'; /')r.4,!- i, ^ {*nt'
"n'L",Lsf k * /r"/t*
''l\;'u" " "' " -;
{* t /,r/ ,{inu*/,^*
.J/;t/14-*
//^-^ T( r''l/asc #-
u,,in,,/ /r /,,," .r/1, /, 7-{ //*,'
,rr. , /) , ,, . /,p /, , ,/:s",, ,',re/7ar.-us[ {..( , / //,r,- ,/, /^"*'1
t*..'-/rt
t'tt,,,t / li. (
....1,y,r,'vrrrtt //,c, I t{sLaLc -,.fu,k"/ {- r{,, ,f- rt4"o.r,7r,o*4*u,
{;,rit' -s,: ,u & ,( - (.' /
i. d)ra/ r.-^r- €dfc
-' ,o'/e1' tr # /$.s, A rf"y ", // &/,, t 0: I / -," ',' / ,y:r+, /"- #,- 1 ,*-,{a; / u'*.r./, ,,* ,/ ;''u, n!-.-,,. - ,',
Soufhwest DisfrictPern ifting Application
New Site
q Existing Site
Applicant Information
Site Name:
Site ID:
County:
Type/Subcode:
Fee submitted: ( ) correct ( ) incorrect
Total Fee Required $- Need $- Refund $
g*4 t-Site ID:
=1ra+Q"-aeaProject Name:
*rrn, /"r_ C L t ,rlFr'tu, rQ,"-
Type/Subcode: ,SC 0g { C:Ptutodification
Renewal
Fee submitted: ,8 , Nltorrect'/t'{ti /\ ( ) incorrect
Total Fee Required $- Need $- Refund $
Name: fra"-/, ('ra 7u<Role:
lnn /, r/Ll-Company: G*1L.,{* r^-,- LAddress:
City: , l--- i1ft/ 1' Zip Code:
Phone:
Fee verified by: ltr L*,r,y'2
Application Assigned To: ('!tL.i.t,4.vt Date:..--_----v-Ll
a
Hf,l I oNn coMPANYI fr.\ | Many Solutions'"
Attention: SUSan Pelz, PESolid Waste Program Manager
To: Florida Department of Environmental ProtectionSolid Waste Program - Southwest District13051 North Telecom ParkwayTemple Terrace, Florida 33637
TransmittalDate: psssl.11ber 29, 2008 Job N0: 87559
Phone: 81 3-632-7600
Regarding: Sarasota County - Central County Solid Waste Disposal Complex
We are sending you:
! shop drawings
f] Copy of letter
Date
X Forapproval
l-l Fo,. you,. ur.
[-l As requested
l-l For review/comment
X Attached
I erint
I changeorder
No.
f] Approved as submitted
l-l Approved as noted
! Refumed for mneclions
E UnOer separate cover via
-
the following items
[] eun. ! samptes I specifications
[l otn.r Binder
Construction Permit Application for the Ph.1 LFGCCS
Permit Drawings
Check for Payment of Application Fee
Deot. of Environmental Protection
These are transmitted as checked below:
I Resubmit- copies for approval
n SuUrit
-
copies for distribution
I n.turn conected prints
f]otn.'
I For bids due I erins retumed after loan to us
Remarks Enclosed are 4 copies of the Construction Permit Application and drawings for the Central CountyWaste Disposal Complex - Phase 1 Landfill Gas Collection and Control System for your approval.Should you have any questions, please contact Carlo Lebron at 904-598-8928. Thank you.
copvto Frank Coggins (Sarasota County), Carlo sisned Ashley Barker, El
Lebron, PE (HDR), File
lf enclosures are not as noted, please notiff us at once
HDR Engineering, Inc. | 200 West Forsyth Street
I suite aoo
I Jacksonville, F L 322024321
N:Vusers\Gail\Stalionerv & Foms\Foms\Transmital.doc
Phone: (904) 59&8900
Fax (904) 59e8988www.hdrinc,com
Page 1 of 1
SARASOTA COUNTY"Dedicated to Quality Serutce"
March 3,2009
Steven G. MorganSolid Waste SectionFlorida Department of Environmental ProtectionSouthwest District13051 North Telecom ParkwayTemple Terrace, Florida 33637 -0926
RE: Central County Solid Waste Disposal Complex,Pending Permit No. : I 30542-009-50/08WACS No.: SWD|58/51614
Depr.
Y;|:ffii,,rr*s*rar
i{AR 0 6 n|0g
Southw**$f ni )iqlp_l*x
Sarasota Countv
Dear Mr. Morgan:
Pursuant to Rule 62-110.106(5.1, F.A.C. .Notices: General Requirements
Attached is an Affidavit of Publication from the Sarasota Herald-Tribune on February 24,2009.
If you have any questions, please do not hesitate to contact me direct$ at (941) 861-1571,
Cell (941) 650-4160, or email a1 filrggins/O-*cgor'.ne1.
Sincerely, ,
n-- // /--flj,,fi LXE7r
Frank CogginsManager, Solid Waste Operations
Attachment
Gary Bennett, General Manager, Solid WasteFrank Hornbrook, FDEP, Tallatrassee, FLCarlo Lebron, P.8., HDR Engineering, lnc., Jacksonville, FLJohn Morris, P.G., FDEP, Temple Terrace, FLSusan Pelz,P.E., FDEP, Temple Terrace, FL
Ktprclers\Cmtral County Sotid Waste Dsposal Complu\FDEAI*gal Notie - Notie of Applietion - 3-349.dc
EIWIRONMENTAL SER{ICES, Sotid Waste Operations . 4(XX) Knights Trail Road, Nokomis, WL3tZ75
Tef 941{61-50{X}' F tx 94148G2620
Snqrcraapr
AFFIDAVIT OF PUBLICATIONSARASOTA HERALD-TRIBUNE
PUBLISHED DAILYSARASOTA. SARASOTA COLINTY, FLORIDA
STATE OF FLORIDACOUNTY OF SARASOTA
BEFORE THE LINDERSIGNED AUTHORITY PERSONALLY APPEARED SHARI BRICKLEY, WHO ON OATH
SAID SHE IS CLASSIFIED DIRECTOR OF ADVERTISING FOR THE SAff.ASOTA HER.ALD-TNBTN'iE, A
DAILY NEWSPAPER. PUBLIS}{ED AT SAR.ASOTA, I}.I SARASCTA CCIJNTY FLORIDA; AND CIRCULATED
IN SARASOTA COUNTY DAILYI THAT THE ATTACHED COPY OF ADVERTISEMENT BEING A NOTICE IN
THE MATTER OF:
State of Florida Department of Environmental Protection Notice of Application The Department announces receipt
of an apptication for permit to constract a tandJill gas collection anrl control sltstem, sabiect to Department tules, ut
the solid waste managem
IN THE COURT V/AS PUBLISHED IN THE SARASOTA EDITION OF SAID NEWSPAPERIN THE
ISSUES OF:
2/24 Ix
AFFIANT FURTHER SAYS THAT THE SAID SARASOTA HERALD-TRIBLTNE IS A NEWSPAPER PUBLISHED
AT SARASOTA, IN SAID SARASOTA COUNTY, FLORIDA, AND THAT THE SAID NEWSPAPER HAS
THERETOFORE BEEN CONTINUOUSLY PUBLISHED IN SAID SARASOTA COUNTY, FLORIDA, EACH DAY,
AND HAS BEEN ENTERED AS SECOND CLASS MAIL MATTER AT THE POST OFFICE IN SARASOTA, IN
SAID SARASOTA COLINTY, FLORIDA, FOR A PERIOD OF ONE YEAR NEXT PRECEDING THE FIRST
PUBLICATION OF THE ATTACHED COPY OF ADVERTISEMENT; AND AFFIANT FURTHER SAYS THAT
SHE HAS NEITHER PAID NOR PROMISED ANY PERSON, FIRM OR CORPORATION ANY DISCOUNT,
REBATE, COMMISSION ORREFUND FORTHE PURPOSE OF SECURING THIS ADVERTISEMENT FOR
PUBLICATION IN THE SAID NEWSPAPER.
SIGNED
;r#
//SwoRNoRAFFIRMEDTo,ANDSUBSCRIBEDBEFoREMETHISq<5DAYoFw-,A.D.,20/?BY SHARI BRICKLEY WHO IS PERSONALLY KNOWN TO ME.
i.j,:,iJ#Bff:fle or Frorrda
g#ffflFJzt?i",*
My commissi on expireEl ! d^y"y/4-,20/r
State of FloridaDepailment of Envitonmental Pbtection
Notice ot Application
The Department announces receipt oJ anapplication tor permit to construct a landfill gascollection and control system, subject toDeDartment rules. at the solid wastemanaoement faciliw referred to as the Sarasotacount! Central Soiid Waste Disposal complex,located at 4000 Knights Trail Road, Nokomis,Sarasola county, Florida,
This application is being processed and isavailabie for public inspection during normalbusiness hours, 8:00 a.m. to 5:00 p.m,, Mondaythrouqh Fridav, except legal holidays, at theDepa-rlment
-of Environmental Protection,
Southwest District Otfice, 13051 North TelecomParkway, Temple Terrace, Florida 33637-0926.
Pub: Februarv 24. 2009