4/8/2021 1 © 2021 FREDERICK COUNTY PUBLIC SCHOOLS BRUNSWICK ELEMENTARY SCHOOL REPLACEMENT DESIGN DEVELOPMENT April 14, 2020 © 2021 FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION April 14, 2020 AGENDA Project Goals |Objectives Design Development Construction Phasing Site Plan Floor Plans Renderings Design Schedule Questions

Transcript of fcps brunswick es: board of education presentation - BoardDocs

4/8/2021

1

© 2

021

FREDERICK COUNTY PUBLIC SCHOOLS

BRUNSWICK ELEMENTARYSCHOOL REPLACEMENT

DESIGN DEVELOPMENT

April 14, 2020

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

AGENDA

Project Goals |Objectives

Design Development

Construction Phasing

Site Plan

Floor Plans

Renderings

Design Schedule

Questions

4/8/2021

2

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

PROJECT & PROTOTYPE GOALS | OBJECTIVES

Establish regularity; promote flexibility.

Emphasize standardization.

Ease site adaptability.

Pursue a compact footprint.

Utilize cost-effective solutions.

Maximize durability and sustainability.

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

EXISTING SITE

ORIGINAL SCHOOL PROPERTY

PARCEL ACQUIRED & ADDED TO SCHOOL PROPERTY

4/8/2021

3

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

EXISTING SITE

© 2

020FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2021

EXISTING BUILDING

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

PHASE 1 - CONSTRUCTION

© 2

020FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2021

PROPOSED BUILDING

EXISTING BUILDING

4/8/2021

4

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

PHASE 2 - DEMOLITION

© 2

020FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2021

PROPOSED BUILDING

EXISTING BUILDING

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

PHASE 2 - CONSTRUCTION

© 2

020FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2021

PROPOSED BUILDING

EXISTING BUILDING

4/8/2021

5

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

FINAL SITE PLAN

© 2

020FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2021

PROPOSED BUILDING

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

FLOOR PLAN

© 2

020

Classrooms

Media Center

Admin

Health Music

Parks and Rec (ADD Alternate)

Cafetorium

Gym

Kitchen

Support

Art

MEP / Utility

FIRST FLOOR

MAIN ENTRY

NOT TO SCALE

4/8/2021

6

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

FLOOR PLAN

Classrooms

Support

Mechanical

Mechanical

SECOND FLOOR

(FIRST FLOOR BELOW)

NOT TO SCALE

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

4/8/2021

7

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

4/8/2021

8

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

4/8/2021

9

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

Exterior - Brick

Brick 1

Brick 2

Brick 3

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

INTERIOR – TYPICAL CLASSROOM

4/8/2021

10

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

INTERIOR - GYMNASIUM

© 2

021FCPS BRUNSWICK ES: BOARD OF EDUCATION PRESENTATION

April 14, 2020

PROJECT SCHEDULE

PHASE DURATION

Design Development December 2020 – April 2021

Construction Documents May 2021 – November 2021

Issued for Bid December 2021

Contracts/Construction Phase 1 April 2022 – June 2023

Student Occupancy August 2023

Construction Phase 2 June 2023 – December 2023

4/8/2021

11

© 2

021

Questions?