Transcript of DECISION OF RTA ERNAKULAM HELD ON 28 10 2021 .pdf
Minutes of the Meeting of Regional Transport
Authority ,Ernakulam held on 28/10/2021
Present: Chairman
Sri.Jafar Malik I.A.S, District Collector,Ernakulam
Members:
1.Sri.K.Karthik I.P.S,District Police Chief,Ernakulam Rural,Aluva
2.Sri.Shaji Madhavan,Deputy Transport Commissioner,CZ-
II,Ernakulam
Item No.01
Heard. This is the application for the grant of fresh intra district regular
permit on the route Elanthikkara-North Paravur-Vyttila Hub as ordinary
moffusil service.This authority considered the application in detail.Route
enquiry officer reported that Elanathikkara,Kanakkankadavu,Kuthiyathode
sector is ill served one, with an average time gap of 20-35 minutes. The
proposed route will not objectionable overlaps notified routes published vide
GO(P) No.42/2009/Tran dtd 14/07/2009 which is further amended by
GO(P) No.08/2017/Tran dtd 23/03/2017.But this route touching Aluva-
Vadakkumpuram Complete exclusion scheme only for Crossing at Vedimara
Jn and it is an inevitable overlapping. Several objections have been received
against the grant of proposed route stating that the route is well served and
there is no requirement for the further permit. But the objection cannot be
sustainable since as per Motor Vehicles Act-1988 , permit cannot be denied
to anyone on the applied route ,if there is no legal impediment.
Therefore, the regular permit is granted in favour of Sri.Binoy on the
applied route Elanthikkara-North Paravur-Vyttila Hub in respect of his
suitable stage carriage with seating capacity not less than 33 in all, subject
to settlement of timings on production of records of the vehicle within the
time limit specified U/R 159[2] of KMV Rules-1989.
Item No.02
Heard;. This authority considered the application for the grant of fresh intra
district regular permit on the route Munambam-North Parur-High Court Jn
as ordinary moffusil service in respect of suitable stage carriage with seating
capacity not less than 33 in all.The proposed route will not objectionably
overlaps notified route published vide GO(P) No.42/2009/Tran dtd
14/07/2009, which is further modified by GO(P) No.08/2017/Tran dtd
23/03/2017. Therefore, there is no legal impediments for the grant of
proposed regular permit. Several objections have been received against the
grant of proposed route stating that the route is well served and there is no
requirement for the further permit. But the objection cannot be sustainable
since as per Motor Vehicles Act-1988 , permit cannot be denied to anyone
on the applied route ,if there is no legal impediment.
Therefore,the regular permit is granted in favour of Sri.Siya P S in
respect of suitable stage carriage with seating capacity not less than 33 in
all, subject to settlement of timings and production of records of the vehicle
within the time stipulated U/R 159[2] of KMV Rules-1989.
Item No.03
Heard;. This authority considered the application for the grant of fresh intra
district regular permit on the route Moothakkunnam-North Parur-High
Court Jn in the vacant timings of Stage Carriage KL-23-E-3831 as ordinary
moffusil service in respect of suitable stage carriage with seating capacity
not less than 33 in all.The proposed route will not objectionably overlaps
notified route published vide GO(P) No.42/2009/Tran dtd 14/07/2009,
which is further modified by GO(P) No.08/2017/Tran dtd 23/03/2017.
Therefore,there is no legal impediments for the grant of proposed regular
permit. Several objections have been received against the grant of proposed
route stating that the route is well served and there is no requirement for
the further permit. But the objection cannot be sustainable since as per
Motor Vehicles Act-1988 , permit cannot be denied to anyone on the applied
route ,if there is no legal impediment.
Therefore,the regular permit is granted in favour of Sri.Sarin D
Valooran in respect of suitable stage carriage with seating capacity not less
than 33 in all, subject to settlement of timings and production of records of
the vehicle within the time stipulated U/R 159[2] of KMV Rules-1989.
Item No.04
Heard.Perused the Judgment of Hon`ble High Court of Kerala in WPC No
6067 of 2021 dated 31/03/2021.This is the application for the grant of fresh
intra district regular permit on the route Vyttila Hub- North Parur as
ordinary moffusil service.This authority considered the application in detail.
The proposed route will not objectionably overlaps notified routes published
vide GO(P) No.42/2009/Tran dtd 14/07/2009 which is further amended by
GO(P) No.08/2017/Tran dtd 23/03/2017.Several objections have been
received against the grant of proposed route stating that the route is well
served and there is no requirement for the further permit. But the objection
cannot be sustainable since as per Motor Vehicles Act-1988 , permit cannot
be denied to anyone on the applied route ,if there is no legal impediment.
Therefore, the regular permit is granted in favour of Smt.Sainaba on
the applied route Vyttila Hub- North Parur in respect of his suitable stage
carriage with seating capacity not less than 33 in all, subject to settlement
of timings and production of records of the vehicle within the time limit
specified U/R 159[2] of KMV Rules-1989.
Item No.05
Heard.Perused the Judgment of Hon`ble High Court of Kerala in WPC No
19806 of 2021 dated 05/10/2021.This is the application for the grant of
fresh intra district regular permit on the route Vyttila Hub- North Parur as
ordinary moffusil service.This application was considered by this authority
through circulation for perusing the order of Hon`ble High Court of Kerala in
WPC No 7562 of 2021 and adjourned on the ground that “an opportunity can
be given for other en-route operators for filing objections and the same can
also be heard and considered as per the Judgment.Hence adjourned”.
This authority re-considered the application in detail for complying
the Judgment of Hon`ble High Court of Kerala in WPC No 19806 of 2021
dated 05/10/2021. The proposed route will not objectionably overlaps
notified routes published vide GO(P) No.42/2009/Tran dtd 14/07/2009
which is further amended by GO(P) No.08/2017/Tran dtd
23/03/2017.Several objections have been received against the grant of
proposed route stating that the route is well served and there is no
requirement for the further permit. But the objection cannot be sustainable
since as per Motor Vehicles Act-1988 , permit cannot be denied to anyone
on the applied route ,if there is no legal impediment.
Therefore, the regular permit is granted in favour of Sri.Ramees
Mohammed on the applied route Vyttila Hub- North Parur in respect of his
suitable stage carriage with seating capacity not less than 33 in all, subject
to settlement of timings on production of records of the vehicle within the
time limit specified U/R 159[2] of KMV Rules-1989.
Item No.06
Heard. This authority considered the application for the grant of fresh intra
district regular permit on the route Pooyappilly-North Parur-Vyttila Hub as
ordinary moffusil service in respect of suitable stage carriage with seating
capacity not less than 33 in all.The proposed route will not objectionably
overlaps notified route published vide GO(P) No.42/2009/Tran dtd
14/07/2009, which is further modified by GO(P) No.08/2017/Tran dtd
23/03/2017. Therefore,there is no legal impediments for the grant of
proposed regular permit. Several objections have been received against the
grant of proposed route stating that the route is well served and there is no
requirement for the further permit. But the objection cannot be sustainable
since as per Motor Vehicles Act-1988 , permit cannot be denied to anyone
on the applied route ,if there is no legal impediment.
Therefore,the regular permit is granted in favour of Sri.Mineesh M P in
respect of suitable stage carriage with seating capacity not less than 33 in
all, subject to settlement of timings and production of records of the vehicle
within the time stipulated U/R 159[2] of KMV Rules-1989.
Item No.07
Heard. This authority considered the application for the grant of fresh intra
district regular permit on the route Kaninad-CEPZ-Kalamassery HMT Jn as
ordinary moffusil service in respect of suitable stage carriage with seating
capacity not less than 38 in all.The proposed route will not objectionably
overlaps notified route published vide GO(P) No.42/2009/Tran dtd
14/07/2009, which is further modified by GO(P) No.08/2017/Tran dtd
23/03/2017. Therefore,there is no legal impediments for the grant of
proposed regular permit. Several objections have been received against the
grant of proposed route stating that the route is well served and there is no
requirement for the further permit. But the objection cannot be sustainable
since as per Motor Vehicles Act-1988 , permit cannot be denied to anyone
on the applied route ,if there is no legal impediment.
Therefore,the regular permit is granted in favour of Sri.Koyakkutty in
respect of suitable stage carriage with seating capacity not less than 38 in
all, subject to settlement of timings and production of records of the vehicle
within the time stipulated U/R 159[2] of KMV Rules-1989.
Item No.08
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-33-2579 (Old vehicle No KL-05-M-3982) on the
route Piravom - Kaloor via Thiruvaniyoor,Vandippetta,Vennikkulam,
Sasthamughal,Thiruvankulam,Karinghachira,S.N Jn, Puthiya Road, Petta
Jn ,Vyttila and MG Road as ordinary moffusil service. This application is
filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017 for converting
the existing temporary permits with existing settled set of timings as
specified under Clause[4] of the above said Ernakulam- Muvattupuzha
modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
20,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of GO(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-33-2579 on the route Piravom - Kaloor via
Thiruvaniyoor,Vandippetta,Vennikkulam, Sasthamughal,Thiruvankulam,
Karinghachira, S.N Jn Puthiya Road, Petta Jn ,Vyttila and MG Road as
ordinary moffusil service as regular permit with existing settled set of time
schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.09
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-17-E-9097 on the route Vattappara-Kaloor Via
Thirumarayoor, Veliyanad, Peppathy, Mulamthuruthy, Chottanikkara,
Thiruvankulam,Karingachira,S.N Jn,Puthiya Road,Petta Jn,Vyttila,
Kadavanthra and M G Road as ordinary moffusil service. This application is
filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017 for converting
the existing temporary permits with existing settled set of timings as
specified under Clause[4] of the above said Ernakulam- Muvattupuzha
modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
16,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-17-E-9097 on the route Vattappara-Kaloor Via
Thirumarayoor, Veliyanad, Peppathy, Mulamthuruthy, Chottanikkara,
Thiruvankulam,Karingachira,S.N Jn,Puthiya Road,Petta Jn,Vyttila,
Kadavanthra and M G Road as ordinary moffusil service as regular permit
with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.10
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-17-E-8282 on the route Kaloor-Koothattukulam
Via M G Road,Vyttila,Petta,Puthiya Road,SN Jn,Thiruvankulam,
Chottanikkara, Mulamthuruthy, Peppathy, Piravom, Anchelpetty and
Thirumarady as ordinary moffusil service. This application is filed in the
light of GO(P) No.05/2017/Tran dtd 21/02/2017 for converting the existing
temporary permits with existing settled set of timings as specified under
Clause[4] of the above said Ernakulam- Muvattupuzha modified scheme.
Consequent to the death of previous Registered owner ,Sri.Chacko, of
Stage Carriage KL-17-E-8282 , the successor , Smt.Alice Chacko, had
applied for Transfer of Ownership.This Authority held on 01/02/2020,vide
item no 55, allowed to operate service the successor,Smt.Alice Chacko, of
the deceased Registered owner after effecting Transfer of Ownership
.Accordingly Smt.Alice Chacko is conducting service on the above route.
This authority in its earlier sitting held on 17/05/2017,vide item no
06,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-17-E-8282 on the route Kaloor-Koothattukulam
Via M G Road, Vyttila,Petta,Puthiya Road,SN Jn,Thiruvankulam,
Chottanikkara, Mulamthuruthy, Peppathy, Piravom, Anchelpetty and
Thirumarady as ordinary moffusil service as regular permit with existing
settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.11
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-07-AT-3816 on the route Piravom-Kaloor Via
Kalamboor,Thirumarayoor,Veliyanad,Peppathy,Arakkunnam,Mulamthuruth
y ,Chottanikkara,Thiruvankulam,Karingachira,Irimpanam Jn(Puthiya Road
Jn/Vilakku Jn),Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary
moffusil service. This application is filed in the light of GO(P)
No.05/2017/Tran dtd 21/02/2017 for converting the existing temporary
permits with existing settled set of timings as specified under Clause[4] of
the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
30,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-07-AT-3816 on the route Piravom-Kaloor Via
Kalamboor,Thirumarayoor,Veliyanad,Peppathy,Arakkunnam,Mulamthuruth
y ,Chottanikkara,Thiruvankulam,Karingachira,Irimpanam Jn(Puthiya Road
Jn/Vilakku Jn),Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary
moffusil service as regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.12
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-05-Y-2181 on the route Ramamangalam-Kaloor
Via Thiruvaniyoor, Meenpara, Vettikkal, Mulamthuruthy ,Chottanikkara,
Thiruvankulam, Karingachira,Puthiya Road,Vilakku Jn,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service. This
application is filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017
for converting the existing temporary permits with existing settled set of
timings as specified under Clause[4] of the above said Ernakulam-
Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
23,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-05-Y-2181 on the route Ramamangalam-Kaloor
Via Thiruvaniyoor, Meenpara, Vettikkal, Mulamthuruthy ,Chottanikkara,
Thiruvankulam, Karingachira,Puthiya Road,Vilakku Jn,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service as
regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.13
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-05-AC-2801(Old Vehicle No KL-06-B-4032) on
the route Koothattukulam-Kaloor Via Thirumarady,Anchalpetty,Piravom,
Peppathy,Arakkunnam,Mulamthuruthy ,Chottanikkara, Thiruvankulam,
Karingachira,Puthiya Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G
Road as ordinary moffusil service. This application is filed in the light of
GO(P) No.05/2017/Tran dtd 21/02/2017 for converting the existing
temporary permits with existing settled set of timings as specified under
Clause[4] of the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
29,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-05-AC-2801(Old Vehicle No KL-06-B-4032) on
the route Koothattukulam-Kaloor Via Thirumarady,Anchalpetty,Piravom,
Peppathy,Arakkunnam,Mulamthuruthy ,Chottanikkara, Thiruvankulam,
Karingachira,Puthiya Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G
Road as ordinary moffusil service as regular permit with existing settled set
of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.14
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-40-A-9466 on the route Thalayolaparambu-
Kaloor Via Thalappara, Neerpara, Kanjiramattom, Mulamthuruthy
,Chottanikkara, Thiruvankulam, Karingachira,Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service. This
application is filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017
for converting the existing temporary permits with existing settled set of
timings as specified under Clause[4] of the above said Ernakulam-
Muvattupuzha modified scheme.
Consequent to the death of previous Registered owner ,Sri.Saji P V, of
Stage Carriage KL-40-A-9466 , the successor , Sri.Elias P V, had applied for
Transfer of Ownership.This Authority held on 22/12/2015 allowed to
operate service the successor,Sri.Elias P V, of the deceased Registered owner
after effecting Transfer of Ownership .Accordingly Sri.Elias P V is conducting
service on the above route.
This authority in its earlier sitting held on 17/05/2017,vide item no
13,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-40-A-9466 on the route Thalayolaparambu-
Kaloor Via Thalappara, Neerpara, Kanjiramattom, Mulamthuruthy ,
Chottanikkara , Thiruvankulam, Karingachira,Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service as
regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.15
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-39-Q-2784 (Old vehicle no KL-07-AQ-2497) on
the route HPC Velloor-Kaloor Via Piravom, Mulamthuruthy ,Chottanikkara,
Thiruvankulam, Karingachira,Puthiya Road,Vilakku Jn,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service. This
application is filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017
for converting the existing temporary permits with existing settled set of
timings as specified under Clause[4] of the above said Ernakulam-
Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
28,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-39-Q-2784 (Old vehicle no KL-07-AQ-2497) on
the route HPC Velloor-Kaloor Via Piravom, Mulamthuruthy ,Chottanikkara,
Thiruvankulam, Karingachira,Puthiya Road,Vilakku Jn,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service as
regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.16
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-39-J-9798 (Old vehicle no KL-39-C-0786) on the
route Thalayolaparambu-Kaloor Via Thalappara,Neerpara,Kanjiramattom,
Mulamthuruthy ,Chottanikkara, Thiruvankulam, Karingachira,Puthiya
Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary
moffusil service. This application is filed in the light of GO(P)
No.05/2017/Tran dtd 21/02/2017 for converting the existing temporary
permits with existing settled set of timings as specified under Clause[4] of
the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
9,considered the application in detail in the light of GO(P) No.05/2017/Tran
published vide S.R.O No.93/2017 dtd 21/02/2017 and adjourned for
reason that “ the applicant had preferred route with same termini,but the way
of travel is modified so as to touching Trippunithura ,avoiding existing service
in between Karinghachira and Pettah Via Puthiya road and S.N Jn.In this
case existing operational route and proposed route in the application is
different .Moreover the proposed route via Trippunithura will defeat the
interest of State Transport undertaking and will fell the STU in huge revenue
loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-39-J-9798 (Old vehicle no KL-39-C-0786) on the
route Thalayolaparambu-Kaloor Via Thalappara,Neerpara,Kanjiramattom,
Mulamthuruthy ,Chottanikkara, Thiruvankulam, Karingachira,Puthiya
Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary
moffusil service as regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.17
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-39-H-5950 on the route Koothattukulam-Kaloor
Via Piravom,Maneed,Thiruvaniyoor,Sasthamugal,Mamala, Thiruvankulam,
Karinghachira, Puthiya Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G
Road as ordinary moffusil service. This application is filed in the light of
GO(P) No.05/2017/Tran dtd 21/02/2017 for converting the existing
temporary permits with existing settled set of timings as specified under
Clause[4] of the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
11,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned ”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-39-H-5950 on the route Koothattukulam-Kaloor
Via Piravom,Maneed,Thiruvaniyoor,Sasthamugal,Mamala, Thiruvankulam,
Karinghachira, Puthiya Road,SN Jn,Petta Jn,Vyttila,Kadavanthra and M G
Road as ordinary moffusil service as regular permit with existing settled set
of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.18
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-39-E-9786 on the route Thalayolaparambu-
Kaloor Via Thalappara,Neerpara,Kanjiramattom,Mulamthuruthy,
Chottanikkara, Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service. This
application is filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017
for converting the existing temporary permits with existing settled set of
timings as specified under Clause[4] of the above said Ernakulam-
Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
07,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-39-E-9786 on the route Thalayolaparambu-
Kaloor Via Thalappara,Neerpara,Kanjiramattom,Mulamthuruthy,
Chottanikkara, Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service as
regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.19
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-36-A-4100 on the route Thalayolaparambu-
Kaloor Via Thalappara,Neerpara,Kanjiramattom,Mulamthuruthy,
Chottanikkara, Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service. This
application is filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017
for converting the existing temporary permits with existing settled set of
timings as specified under Clause[4] of the above said Ernakulam-
Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
24,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-36-A-4100 on the route Thalayolaparambu-
Kaloor Via Thalappara,Neerpara,Kanjiramattom,Mulamthuruthy,
Chottanikkara, Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta
Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service as
regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.20
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-17-F-7577 on the route Piravom-Kaloor Via
Maneed,Sasthamugal, Thiruvankulam, Karinghachira, Puthiya Road,SN
Jn,Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service.
This application is filed in the light of GO(P) No.05/2017/Tran dtd
21/02/2017 for converting the existing temporary permits with existing
settled set of timings as specified under Clause[4] of the above said
Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
12,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-17-F-7577 on the route Piravom-Kaloor Via
Maneed,Sasthamugal, Thiruvankulam, Karinghachira, Puthiya Road,SN
Jn,Petta Jn,Vyttila,Kadavanthra and M G Road as ordinary moffusil service
as regular permit with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.21
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-17-F-6906 on the route Piravom-Kaloor Via
Koorkavu,Memugham,Vettikal,Peppathy,Mulamthuruthy,Chottanikkara,
Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta Jn,Vyttila,
Kadavanthra and M G Road as ordinary moffusil service. This application is
filed in the light of GO(P) No.05/2017/Tran dtd 21/02/2017 for converting
the existing temporary permits with existing settled set of timings as
specified under Clause[4] of the above said Ernakulam- Muvattupuzha
modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
13,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-17-F-6906 on the route Piravom-Kaloor Via
Koorkavu,Memugham,Vettikal,Peppathy,Mulamthuruthy,Chottanikkara,
Thiruvankulam, Karinghachira, Puthiya Road,SN Jn,Petta Jn,Vyttila,
Kadavanthra and M G Road as ordinary moffusil service as regular permit
with existing settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.22
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-07-BT-7947 on the route Kothad Ferry-
Thiruvaniyoor Via Chittoor,Kacheripady,Menaka,Jetty,Vyttila,Petta,S.N Jn,
Puthiya Road,Karinghachira,Thiruvankulam,Chottanikkara and Vettikkal
OEN as ordinary moffusil service. This application is filed in the light of
GO(P) No.05/2017/Tran dtd 21/02/2017 for converting the existing
temporary permits with existing settled set of timings as specified under
Clause[4] of the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
17,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-07-BT-7947 on the route Kothad Ferry-
Thiruvaniyoor Via Chittoor,Kacheripady,Menaka,Jetty,Vyttila,Petta,S.N Jn,
Puthiya Road,Karinghachira,Thiruvankulam,Chottanikkara and Vettikkal
OEN as ordinary moffusil service as regular permit with existing settled set
of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.23
1.Heard. This is the application for the grant of fresh regular permit in
respect of stage carriage KL-06-C-8962 on the route Edakkattuvayal-
Kalamassery Via Chottanikkara, Thiruvankulam, Karinghachira, Puthiya
Road,SN Jn,Petta Jn,Vyttila, Kadavanthra,M G Road,Kaloor and
Palarivattom as ordinary moffusil service. This application is filed in the
light of GO(P) No.05/2017/Tran dtd 21/02/2017 for converting the existing
temporary permits with existing settled set of timings as specified under
Clause[4] of the above said Ernakulam- Muvattupuzha modified scheme.
This authority in its earlier sitting held on 17/05/2017,vide item no
14,considered the application in detail in the light of GO(P)
No.05/2017/Tran published vide S.R.O No.93/2017 dtd 21/02/2017 and
adjourned for reason that “ the applicant had preferred route with same
termini,but the way of travel is modified so as to touching Trippunithura
,avoiding existing service in between Karinghachira and Pettah Via Puthiya
road and S.N Jn.In this case existing operational route and proposed route in
the application is different .Moreover the proposed route via Trippunithura will
defeat the interest of State Transport undertaking and will fell the STU in
huge revenue loss.Hence adjourned”.
Now the applicant has desired to convert the temporary permit as
Regular permit on the very same route,without touching Trippunithura.
This authority reconsidered the application in detail in the light of
GO(P) No 05/2017/Tran dated 21/02/2017.As per clause [4] of the above
said notification,the Government of Kerala has ordered that “the Temporary
permit in the Annexure will also be permitted to operate and they will be
permitted to convert their permits as Regular permit”.
Therefore in the light of G.O(P) No.05/2017/Tran dtd 21/02/2017,
this authority hereby regularized and converting temporary permit in
respect of stage carriage KL-06-C-8962 on the route Edakkattuvayal-
Kalamassery Via Chottanikkara, Thiruvankulam, Karinghachira, Puthiya
Road,SN Jn,Petta Jn,Vyttila, Kadavanthra,M G Road,Kaloor and
Palarivattom as ordinary moffusil service as regular permit with existing
settled set of time schedule.
2.The Secretary RTA is directed to issue regular permit with existing settled
time schedule on production of current records of the vehicle within the time
limit specified U/R 159[2] of KMV Rules-1989.
Item No.24
1. Perused the judgment of Hon’ble STAT in MVAA No.103/2020 Dated
18/09/2020
2.Heard;the learned counsel represented the applicant and the Counsel
represented the KSRTC. This is the application for variation of regular
permit in respect of stage carriage KL-07-AZ-1576 operating on the route
Aluva-South Chittoor Temple as Ordinary Moffusil service. By the proposed
variation, the permit holder is desired to vary the permit so as to operate as
Aluva-South Chittoor Temple with extension from Kunnumpuram to Vyttila.
This authority in its earlier sitting held on 01/02/2020,vide item no
20, considered the application and rejected on the ground that the proposed
variation will adversely affect the existing passengers .The said decision of
the RTA was challenged by the applicant before the Hon’ble STAT in MVAA
No 103/2020.As per the Judgment dated 18/09/2021,the Hon`ble court set
aside the decision of RTA and directed RTA to reconsider the application for
variation afresh on merits and pass orders in accordance with law after
hearing both sides.
In complying the Judgment of Hon`ble STAT,this authority heard the
learned counsel appeared for the applicant and reconsidered the application
in the light of enquiry report furnished by the filed officer, objection filed by
the public and connected file and revealed that that
By the proposed variation,the applicant is desired to vary the permit
so as to curtail trips to South Chittoor so as to extend service to Vyttila Hub
. The enquiry officer has reported that the proposed curtailments 3 out of 4
to South Chittoor and Curtailment of night trips and shuffling of time
schedule will adversely affect the existing passengers. Objections have been
received from the President,Cheranellore Grama Panchayath against the
curtailment of trips . On perusal of the file and proposed time schedule, this
authority felt that the objection raised by the public is genuine and the
curtailment of trips will adversely affect the general public. Interest of the
public is the main factor for the grant of a variation on existing regular
permit. The existing benefits enjoyed by the public shall not be deprived of
consequent to the variation of the permit. Hence curtailment of existing trips
cannot be allowed. Moreover there is no necessity under rule 145(6)
warranting for the grant of proposed variation.
This authority also feels that the sector Kunnumpuram to Vyttila Hub
via Edappally By pass is very well served sector and hence consequence of
curtailment of trips is much higher than the proposed extension .The
difficulties to be faced by the travelling public consequent to the proposed
curtailment will outweigh the advantages offered by the proposed extension
to Vyttila Hub. It cannot be allowed.
In view of the aforesaid fact and circumstances, the application for the
variation of permit is hereby rejected.
Item No.25
1.Perused the judgment of Hon’ble STAT in MVAA No.262/2014 Dated
22/07/2019
2.Heard;the learned counsel represented the applicant and the Counsel
represented the KSRTC and objectors. This is the application for variation of
regular permit in respect of stage carriage KL-07-AV-910 operating on the
route Fortkochi-W.Island-Kumbalanghy as Ordinary city service. By the
proposed variation, the permit holder is desired to vary the permit so as to
operate trips as KMP Nagar-Fortkochi except the first trip which as at
present as Fortkochi-W Island and curtail all trips from Kumbalanghi
Panchayath to Kallanchery.
This authority in its earlier sitting held on 07/02/2013,vide item no
99, and on 05/08/2014,vide item no 15, considered the application and
rejected on the ground that the curtailment is against the public interest
.The said decision of the RTA was challenged by the applicant before the
Hon’ble STAT in MVAA No 262/2014.As per the Judgment dated
22/07/2019,the Hon`ble court “set aside the decision of RTA and directed
RTA to reconsider the application for variation and pass orders in
accordance with law and also directed to grant variation sought,if there is no
legal impediments”.
In complying the Judgment of Hon`ble STAT,this authority
reconsidered the application in details in the light of enquiry report
furnished by enquiry officer, objections raised by the public and connected
file.
By the proposed variation, now the applicant intimated that they did
not want deviation via KMP Nagar as sought for and only want to curtail all
trips from Kumbalanghy Panchayath to Kallanchery since the road is
narrow.An enquiry conducted through field officer,Mattanchery for specific
report and he reported that “the route of one kilometre from Kumbalanghi
Panchayath to Kallanchery is narrow with lots of sharp bend and curves.The
width of the road is as narrow as 3.6 meters in many curves,which is
difficult to maneuver for buses and also will make traffic block even if there
is a two wheeler coming from opposite direction.There is no space for
turning the Stage Carriage at the termini,Kallanchery.The general public
pointed out that ,the both sides of road were open and not demarcated
earlier,but now the land is sold in small plots and houses were buit with
compound walls.This resulted in the present situation.They also pointed
that the bus was turning at an open ground ,St Martin D Porus ,Roman
Catholic church,Kallanchery,but the land owner closed the entry by building
compound wall.The service in this route was interrupted for the last five
years.All the above circumstances of the trip are beyond the control of the
permit holder”.
In view of the aforesaid fact and circumstances and in compliance of
the judgment of Hon’ble STAT in MVAA No.262/2014 Dated
22/07/2019.This authority allowed to curtail the portion from Kumbalanghi
Panchayath to Kallanchery as applied for without changing the existing
timing.
Item No.26
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is the application for variation of regular
permit in respect of stage carriage KL-07-BF-819 operating on the route
Nilampathinjimughal –Mattanchery-Mundamveli as Ordinary city service. By
the proposed variation, the permit holder is desired to operate 2,3,4,5,8 and
9trips by curtailing portion from Nilampathinjimugal to Kakkanad for a
distance of 1.9 km. This authority considered the application in the light of
enquiry report furnished by the field officer and connected file. The enquiry
officer has reported that the curtailment will adversely affect the public who
accustomed with the existing timings of the vehicle. Moreover, the curtailed
route is an ill served area where only few vehicles are conducting service.
If the proposed curtailment is allowed this authority felt that it will
permanently deprive the existing benefits of the travelling public. Interest of
the public is the main factor for the grant of a variation on existing regular
permit. The existing benefits enjoyed by the public shall not be deprived of
consequent to the variation of the permit. Hence curtailment of existing trips
cannot be allowed. Moreover there is no necessity under rule 145(6)
warranting for the grant of proposed variation.
Regional Transport Authority is constituted to consider applications
and grant permit for providing better travelling facility to the public .In this
case this authority granted permit for the convenience of the travelling
public to Nilampathinjimugal.The proposed variation will not give any
additional advantage to the travelling public.
In view of the aforesaid fact and circumstances, the application for the
variation of permit is hereby rejected.
Item No.27
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-38-H-1424 operating on the route
Elamakkara-Chottanikkara Ordinary city service. By the proposed variation,
the permit holder is desired to operate 8th trip from Chottanikkara to Kaloor
extend upto Ponekkara and 9th trip from Kaloor to Chottanikkara is only
upto Trippunithura. This authority considered this application in its earlier
sitting held on 01/02/2020 and adjourned on the ground that the report is
not specific one.
This authority Re-considered the application in the light of enquiry
report furnished by the field officer and connected file. The enquiry officer
has reported that the extension of trip from Kaloor to Ponekkara via
Elamakkara ,which is beneficial to the passengers and curtailment of trip
between Trippunithura to Chottanikkara will not adversaly affect the
passengers.There is no additional overlapping in the variation portion.
Hence the Proposed variation is granted on public interest subject to
settlement of timings.
Item No 28
Heard.The learned council represented the applicant and council
represented the KSRTC.This is an application for variation of regular permit
in respect of stage carriage KL-39-N-1975 on the route Koothattukulam-
Kaloor. By the proposed variation,the permit holder desired to deviate 6th
trip from Palachuvadu to Koothattukulam avoiding Periyapuram and
Thirumarady.The submitted report of enquiry officer is not self explanatory
to ascertain whether there is any additional overlapping consequent to the
deviation of trip.Therefore the Secretary RTA is directed to call detailed and
specific report from the field officer and place the matter in the next
sitting.Hence adjourned.
Item No 29
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-40-2419 operating on the route Panangad-
Aluva Ordinary city service. By the proposed variation, the permit holder is
desired to operate as deviate the 1st and 11the trips starting from Panangad
to Aluva via Bypass and Medical center by curtailing the portion from Vyttila
Jn to Edappally Signal via South and Kaloor. This authority considered the
application in the light of enquiry report furnished by the field officer and
connected file.The proposed variation includes deviation and
curtailment.The enquiry officer has reported that the curtailments of trip via
Vyttila Jn to Edappally Signal via South and Kaloor will adversely affect the
travelling public in city limit.
The grant of new stage carriage permits in the private sector through
city roads of Kochi is prevented by the Government by way of notifications,
Hence there is no chance to introduce new stage carriage permits directly
connecting the curtailed portions such as Edappally,Palarivattom,Kaloor
and South. If the proposed curtailment is allowed this authority felt that it
will permenantly deprive the existing benefits of the travelling public.
Interest of the public is the main factor for the grant of a variation on
existing regular permit. The existing benefits enjoyed by the public shall not
be deprived of consequent to the variation of the permit. Hence curtailment
of existing trips cannot be allowed. Moreover there is no necessity under
rule 145(6) warranting for the grant of proposed variation.
In view of the aforesaid fact and circumstances, the application for the
variation of permit is hereby rejected.
Item No 30
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-41-A-1251 operating on the route
Chottanikkara-Kaloor Ordinary city service. By the proposed variation, the
permit holder is desired to change starting and halting place from
Chottanikkara to Trippunithura and intends to introduce a trip early
morning from Trippunithura to Chottanikkara .This authority considered
the application in the light of enquiry report furnished by the field officer
and connected file.The curtailment of last trip from Trippunithura to
Chottanikkara will adversaly affect the late night passengers.In this
proposed variation the number of trips increased from 12 to 13 and the
additional trip (1st trip) from Trippunithura to Chottanikkara is
objectionably overlaps the notified scheme published vide G.O(P) No
05/2017/Tran dated 21/02/2017. As per clause 19 of the above said
notification,the right to operate any new service and to increase the trips in
the notified routes or its portions will be reserved exclusively for the State
Transport Undertaking. In this case ,the applicant offered new trips on the
portion of notified routes. This authority felt that,if the proposed deviation is
allowed,it will be a clear violation of above said notification and connected
judgments in this regard.
2. Vide Judgment of Hon’ble Supreme Court of India in C.A No.4480 of
1998[Venkataswamy Reddy v. State Transport Authority] and connected
cases dtd 19/07/2016 it is clearly pronounced that ,no private operator can
operate his vehicle on any part or portion of a notified area or notified route
unless authorized so to do by the terms of the scheme itself.He may not
operate on any part or portion of the notified route or Area on the mere
ground that the permit as originally granted to him covered the notified
route or area. Hence the proposed variation cannot be granted violating the
scheme of nationalization.
In view of the aforesaid fact and circumstances, the application for the
variation of permit is hereby rejected.
Item No 31
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-07-AS-4533 operating on the route
Ernakulam (Kaloor Bus Stand)- North Paravur Ordinary service. By the
proposed variation, the permit holder is desired to change starting and
halting place from Cheranellore to North Paravur with curtailing trips no
1,7,8 and 12 and intends to extend the 7th trip from Cheranellore to Vyttila
Hub.This authority considered the application in the light of enquiry report
furnished by the field officer and connected file.The curtailments will
adversely affect the existing passengers .Interest of the public is the main
factor for the grant of a variation on existing regular permit. The existing
benefits enjoyed by the public shall not be deprived of consequent to the
variation of the permit. Hence curtailment of existing trips cannot be
allowed. Moreover there is no necessity under rule 145(6) warranting for the
grant of proposed variation.
In the above circumstances, the application for the variation of permit
is hereby rejected.
Item No.32
1.Perused the judgment of Hon’ble State Transport Appellate Tribunal in
MVAA No.268/2018 Dated 21/12/2019
2.Heard;the learned counsel represented the applicant and the Counsel
represented the KSRTC and objectors. This is the application for variation of
regular permit in respect of stage carriage KL-07-AX-2700 (Old vehicle no
KL-08-AJ-9095) operating on the route Munnurpilly-Elavoor-Palissery-
Malayattoor as Ordinary Moffusil service. By the proposed variation, the
permit holder is desired to re arrange the existing trips and revision of
existing timings and curtailment of some trips so as to operate
1.Curtailment of existing route portion in trip no 4 from Angamaly to
Elavoor chanda via Vattapparambu and return in trip no 5 from Elavoor
chanda to Angamaly .
2.In the proposed variation an additional trip in 5th trip from Angamaly to
Palassery and 6th trip from Palissery to Angamaly
2.Curtailment of existing trip no 10 from Palissery to Angamaly and 11th trip
from Angamaly to Palissery
4.In the proposed variation 12th trip from Munnoorpally to Palissery and
halt there.
This authority in its earlier sitting held on 17/03/2018,vide item no
12,considered the application and rejected on the ground that the “route
potion is objectionably overlaps notified routes published vide G.O (P) No
08/2017/Trans dated 23/03/2021.The regular permit is coming under the
classification of saved permit and further extension or variation in above
saved permit is prevented by Clause 4 of the above notification.In view of the
above legal impediments,the application is hereby rejected”.
The said decision of the RTA was challenged by the applicant before
the Hon’ble STAT in MVAA No 268/2018.As per the Judgment dated
22/12/2019,the Hon`ble court pronounced that“As stated already ,the
application for variation was rejected on the ground that the variation sought
for objectionably overlaps the notified route.According to the appellant ,he did
not seek any deviation,extension or curtailment.What is sought for is only the
rearrangement of certain trips.Hence,there is no question of objectionable
overlapping violating scheme,contended the counsel.The submission made by
the learned counsel that the appellant does not seek deviation,extension or
curtailment is recorded.There is no consideration on merits whether the
rearrangement of trips sought by way of variation by the appellant is
allowable or not.Hence, I hold that the matter requires reconsideration.In the
result ,the appeal is allowed.The impungned order,ie decision of RTA, is set
aside.The RTA,Ernakulam is directed to reconsider the application for
variation in the light of the observation made in this Judgment and pass
orders in accordance with law after hearing both sides including KSRTC”.
In complying the Judgment of Hon`ble STAT,this authority
reconsidered the application in details in the light of enquiry report
furnished by enquiry officer,objections raised by the public and connected
file.
On perused the enquiry report it is revealed that the there is a
curtailment in the existing route portion in trip no 4 from Angamaly to
Elavoor chanda via Vattapparambu and in trip no 5 is also curtailed from
Elavoor Chanda to Angamaly and it will adversely affect the
passengers.Moreover the existing trip no 10 and 11 are also curtailed from
Angamaly to Pallissery and vice versa.Moreover, the applicant proposed an
additional trips on the portion of notified routes.
In this case ,the applicant intends to curtail the trips, addition of trips
and revise the time schedule.But in the Judgment the appellant argument is
that,he did not seek deviation,curtailment and extension.This is a false
statement.
By the proposed variation,the main intension of the permit holder is to
revise the time schedule. The time revision will adversely affect the travelling
public and settled position of timings in the entire sector and there no
change of circumstances warranted under rule 145[7] of KMV Rules-1989 to
revise the existing timings.
Moreover,if the proposed additional trip is allowed,it will be a clear
violation of notification published vide G.O (P) No 42/2009/Trans date
14/07/2009 which is further amended by G.O (P) No 08/2017/Trans dated
23/03/2017.
In view of the aforesaid facts and circumstances, this authority
perused the Judgment and it is revealed that the proposed variation
application is not only for rearrangements of trips, it includes
curtailments,additional trip and revision of timings.Hence the application for
the variation of permit is hereby rejected.
Item No 33
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-24-A-3670 operating on the route North
Paravur-Vyttila Hub as Ordinary Moffusil service. By the proposed variation,
the permit holder is desired to extend the trip no 6 from Kunnumpuram to
North Paravur and Curtail the Trip no 7 and 8 .This authority considered
the application in the light of enquiry report furnished by the field officer
and connected file.The proposed variation will adversely affect the travelling
public.Interest of the public is the main factor for the grant of a variation on
existing Regular permit.The existing benefits enjoyed by the public shall not
be deprived of consequent to the variation of the permit.
In the above circumstances ,the proposed variation is hereby
rejected on public interests.
Item No 34
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular
permit in respect of stage carriage KL-05-R-7502 operating on the route
Eramallore-Aluva as Ordinary Moffusil service. By the proposed variation,
the permit holder is desired to deviate the trip no 4 from Aluva via
Medical College and then Byepass deviating from Edappally ,in trip no 5
from Eramalloor to Kaloor via Vyttila,K K Road instead of South and M G
Road. This authority considered the application in the light of enquiry
report furnished by field officer and connected file.The proposed variation
will adversely affect the existing passengers.Interest of the public is the
main factor for the grant of a variation on existing regular permit. The
existing benefits enjoyed by the public shall not be deprived of
consequent to the variation of the permit. Hence curtailment of existing
trips cannot be allowed. Moreover there is no necessity under rule 145(6)
warranting for the grant of proposed variation.
In the above circumstances,the proposed variation is hereby
rejected on public interests.
Item No.35
1.Perused the Judgment of Hon`ble High Court of Kerala in WPC No 20383
of 2020 dated 06/09/2021
2. Heard; the learned counsel represented the applicant and the Counsel
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-07-BF-9214 operating on the route
Munambam-Gothuruth, as ordinary moffusil service.This authority
considered this application through circulation in compliance of Judgment
of Hon`ble High Court of Kerala in WPC No 28148/2019 and adjourned on
the ground that “the secretary RTA to seek specific report from the field
officer”.
This authority reconsidered the application in detail in compliance the
Judgement of Hon`ble High Court of Kerala In WPC No 20383 of 2020 and
in the light of further enquiry report submitted by the field officer .He has
reported that the permit holder intends to deviate the route from
Chendamangalam Via Bharanimukku to Vadakkumpuram curtailing
Munduruthy Bridge-Kunnathully.The sector munduruthy to Kunnathully is
ill served and therefore this proposal of variation is against the interest of
public of those inner residential areas.Moreover the proposed route is
objectionably overlaps Aluva-Vadakkumpuram complete exclusion
scheme.This authority is prevented from the grant/renewal of the regular
permit even on the portions of the Aluva-Vadakkumpuram complete
exclusion scheme.Hence the proposed variation of a permit on the Aluva-
Vadakkumpuram scheme cannot be considered without avoiding the
existing violation of scheme of nationalization.The regular permit of the
stage carriage KL-07-BF-9214 is valid only up to 14/03/2018, and this
authority is prevented from the renewal of this permit without avoiding the
objectionabale overlapping on Aluva-Vadakkumpuram complete exclusion
scheme.
In view of the aforesaid fact and circumstances, the application
for the variation of permit is hereby rejected.
Item No 36
Heard.the learned counsel represented the applicant and counsel
represented the KSRTC.This is an application for variation of Regular permit
in respect of Stage Carriage KL-07-BF-9394 on the route Thuthiyoor-
Edakochi-Perumpadappu as ordinary city service.By the proposed
variation,the permit holder is desired to deviate the trip no 6th from
Perumpadappu to Kakkanad via Kakkanad Civil line and trip no 7th from
Kakkanad to Ernakulam south via Chittoor road and Iyattumukku.This
authority in its earlier sitting held on 18/09/2019,vide item no
106,considered the application and adjourned for want of specific report
from the field officer.
This authority considered the application in the light of enquiry
report furnished by the field officer and connected file.The proposed
variation will adversely affect the travelling public.Interest of the public is
the main factor for the grant of a variation on existing Regular permit.The
existing benefits enjoyed by the public shall not be deprived of consequent
to the variation of the permit.
In the above circumstances ,the proposed variation is hereby
rejected on public interests.
Item No 37
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-07-BH-8052 operating on the route
Thoppumpady-Aluva as Ordinary City service. By the proposed variation,
the permit holder is desired to deviate the trip no 5 from Thevara to Medical
College by curtailing Aluva and 6th from Medical College to Thevara and trip
no 7th from Thevara to Pukkattupady by curtailing trip to Medical College
and 8th trip starts from Pukkattupady to Thoppumpady via Medical College
.This authority considered the application in the light of enquiry report
furnished by the field officer and connected file. The proposed variation will
adversely affect the travelling public. Interest of the public is the main factor
for the grant of a variation on existing Regular permit.The existing benefits
enjoyed by the public shall not be deprived of consequent to the variation of
the permit.Hence curtailment of existing trips cannot be allowed. Moreover
there is no necessity under rule 145(6) warranting for the grant of proposed
variation.
In the above circumstances ,the proposed variation is hereby
rejected on public interests.
Item No 38
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-25-A-9018 operating on the route
Kayantikkara-Aluva-Trippunithura as Ordinary Moffusil service. By the
proposed variation, the permit holder is desired to curtail the portion from
Kayantikkara to Aluva and to change starting and halting place from
Kayantikkara to Medical College.This authority in its earlier sitting held on
01/02/2020,vide item no 29,considered this application and adjourned for
want of specific report from the field officer.
This authority reconsidered this application in the light of enquiry
report furnished by the field officer and connected file and it is revealed that
the curtailment will adversely affect the public who accustomed with the
existing timings of the vehicle. Moreover, the curtailed route is an ill served
area where only few vehicles are conducting service.
If the proposed curtailment is allowed this authority felt that it will
permanently deprive the existing benefits of the travelling public. Interest of
the public is the main factor for the grant of a variation on existing regular
permit. The existing benefits enjoyed by the public shall not be deprived of
consequent to the variation of the permit. Hence curtailment of existing trips
cannot be allowed. Moreover there is no necessity under rule 145(6)
warranting for the grant of proposed variation.
Regional Transport Authority is constituted to consider applications
and grant permit for providing better travelling facility to the public .In this
case this authority granted permit for the convenience of the travelling
public to Kayantikkara.The proposed variation will not give any additional
advantage to the travelling public.
In view of the aforesaid fact and circumstances, the application for the
variation of permit is hereby rejected.
Item No 39
Heard; the learned counsel represented the applicant and council
represented the KSRTC. This is an application for variation of regular permit
in respect of stage carriage KL-42-Q-9394 operating on the route Vyppin-
Maliankara Ordinary Moffusil service. By the proposed variation, the permit
holder is desired to change starting and halting place from
Elamkunnapuzha to Cherai and extending existing trips nos 2 to 7 from
Maliankara to Manibazar.This authority considered the application in the
light of enquiry report furnished by the field officer and connected file.The
enquiry officer has reported that the changing the starting and halting place
will improve the connectivity of the employees and students from Vyppin
peninsula to the City and route extension in the trips no 2 to 7 will be
beneficial to the travelling public.Moreover the route extension seeking
portion connects the prominent fishing zone Munambam to the Ernakulam
City.There is no objectionable overlapping in the extension portion. Hence
the Proposed variation is granted on public interest subject to settlement of
timings.
Item No : 40
Heard. This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-07-AS-1530 on the route Malavana Ferry-Kodungallur
Via North Paravur.The permit holder has filed application within the time
limit prescribed under section 81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 17/11/2016,vide item no
19,considered the renewal application and adjourned for reason that “The
route is having length of 17.5 km in which the portion of the route from
North Parur to Bharanimukku which is 2.6 km in length objectionably
overlaps Aluva-Vadakkumpuram complete exclusion scheme. Judgments of
Hon’ble High Court of Kerala in WP© No.4435/2011 and connected cases,
prohibited the renewal of regular permit issued on Aluva-Vadakkumpuram
Complete exclusion scheme reserved for the State Transport Undertaking.
KSRTC also objected the renewal of permits on the portions of Aluva-
Vadakkumpuram Scheme.Vide letter No.10689/B1/2014/Tran dtd
17/07/2014 the Government of Kerala has decided to formulate schemes
under section 99 of the MV Act for making an objective assessment on the
actual requirement of the KSRTC and in order to ensure sufficient travel
facilities to the general public. Hence this authority is not able to take a
decision in this situation. This authority is decided to wait for further orders
from the government in this regard. Hence adjourned.Secretary RTA has the
liberty to issue temporary permit to continue operation on public interest till
the final disposal of the application”.
The above legal impediment is still existence.Therefore this authority
is not able to take a decision in this situation.This authority is decided to
wait for further orders from the Government in this regard.Hence adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item No.41
Heard. This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-08-AH-550 on the route Angamaly Town-North Paravur
as ordinary Moffusil service.The permit holder has filed application within
the time limit prescribed under section 81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 17/03/2018,vide item no
15,considered the renewal application and adjourned for reason that “The
route is having length of 20 km in which the portion of the route in question
from North Parur to Vedimara which is 2.1 km in length objectionably
overlaps Aluva-Vadakkumpuram complete exclusion scheme ,which is
exclusively reserved for the State Transport Undertaking. Judgments of
Hon’ble High Court of Kerala in WP© No.4435/2011 and connected cases,
prohibited the renewal of regular permit issued on Aluva-Vadakkumpuram
Complete exclusion scheme reserved for the State Transport Undertaking.
KSRTC also objected the renewal of permits on the portions of Aluva-
Vadakkumpuram Scheme. Vide letter No.10689/B1/2014/Tran dtd
17/07/2014 the Government of Kerala has decided to formulate schemes
under section 99 of the MV Act for making an objective assessment on the
actual requirement of the KSRTC and in order to ensure sufficient travel
facilities to the general public. Hence this authority is not able to take a
decision in this situation. This authority is decided to wait for further orders
from the government in this regard. Hence the application for the renewal of
regular permit is adjourned.The Secretary RTA is permitted to issue
temporary permits for durations of 4 months U/S 87[1]d of MV Act in favour
of the permit holder to continue operation on the same route on public
interest.
The above legal impediment is still existence.Therefore this authority
is not able to take a decision in this situation.This authority is decided to
wait for further orders from the Government in this regard.Hence adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item No.42
Heard.This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-38-2319 on the route North Paravur-Angamaly as
ordinary Moffusil service.The permit holder has filed application within the
time limit prescribed under section 81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 22/12/2015,vide item no
66,considered the renewal application and adjourned for reason that “The
route is having length of 31 km in which the portion of the route in question
from North Parur to Vedimara which is 2.1 km in length objectionably
overlaps Aluva-Vadakkumpuram complete exclusion scheme ,which is
exclusively reserved for the State Transport Undertaking. Judgments of
Hon’ble High Court of Kerala in WP© No.4435/2011 and connected cases,
prohibited the renewal of regular permit issued on Aluva-Vadakkumpuram
Complete exclusion scheme reserved for the State Transport Undertaking.
KSRTC also objected the renewal of permits on the portions of Aluva-
Vadakkumpuram Scheme. Vide letter No.10689/B1/2014/Tran dtd
17/07/2014 the Government of Kerala has decided to formulate schemes
under section 99 of the MV Act for making an objective assessment on the
actual requirement of the KSRTC and in order to ensure sufficient travel
facilities to the general public. Hence this authority is not able to take a
decision in this situation. This authority is decided to wait for further orders
from the government in this regard. Hence the application for the renewal of
regular permit is adjourned.The Secretary RTA is permitted to issue
temporary permits for durations of 4 months U/S 87[1]d of MV Act in favour
of the permit holder to continue operation on the same route on public
interest.
The above legal impediment is still existence.Therefore this authority
is not able to take a decision in this situation.This authority is decided to
wait for further orders from the Government in this regard.Hence adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item No : 43
Heard. This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-40-B-429 on the route Kunjithai-Kodungallur. The permit
holder has filed application within the time limit prescribed under section
81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 22/10/2015,vide item no
67,considered the renewal application and adjourned for reason that “The
route is having length of 17.8 km in which the portion of the route from
North Parur to Vadakkumpuram which is 4.7 km in length objectionably
overlaps Aluva-Vadakkumpuram complete exclusion scheme. Judgments of
Hon’ble High Court of Kerala in WP© No.4435/2011 and connected cases,
prohibited the renewal of regular permit issued on Aluva-Vadakkumpuram
Complete exclusion scheme reserved for the State Transport Undertaking.
KSRTC also objected the renewal of permits on the portions of Aluva-
Vadakkumpuram Scheme.Vide letter No.10689/B1/2014/Tran dtd
17/07/2014 the Government of Kerala has decided to formulate schemes
under section 99 of the MV Act for making an objective assessment on the
actual requirement of the KSRTC and in order to ensure sufficient travel
facilities to the general public. Hence this authority is not able to take a
decision in this situation. This authority is decided to wait for further orders
from the government in this regard. Hence adjourned.Secretary RTA has the
liberty to issue temporary permit to continue operation on public interest till
the final disposal of the application”.
The above legal impediment is still existence.Therefore this authority
is not able to take a decision in this situation.This authority is decided to
wait for further orders from the Government in this regard.Hence adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item No.44
1.Perused the Judgment of Hon`ble High Court of Kerala in WPC No
13816/2021 dated 26/08/2021
2.Heard; the learned counsel represented the applicant and the counsel
represented the KSRTC. This is the applications for the Renewal of the
Regular Permit and Variation of Permit in respect of Stage carriage KL-58-M-
670(Old No KL-11-AB-3737)on the route Chottanikkara-Thrissur.This
authority reconsidered the application for variation of permit in respect of
Stage Carriage KL-58-M-670(Old No KL-11-AB-3737).In this application ,the
permit holder had sought curtailment of trips in between North Paravur and
Chottanikkara in the existing permit.
This authority reconsidered the application for variation of regular
permit in respect of stage carriage KL-58-M-670(Old No KL-11-AB-
3737)covered by a regular permit on the route Chottanikkara- Thrissur as
LSOS. In this application, the permit holder has sought curtailment of trips
in between North Parur and Chottanikkara in the existing permit. On
perusal of the records, it reveals that as there were so many objections
against the non operation of service to Chottanikkara, this authority while
considering the application for the renewal of permit in respect of stage
carriage on the route Chottanikkara-Thrissur, directed the Secretary of RTA
to watch the service of the above stage carriage to Chottanikkara.
Thereafter, the Secretary RTA has intimated that, the route enquiry officer
verified the service of the stage carriage in question and reported the non
operation of service to Chottanikkara from Vyttila. During the pendency of
action on permit for the purposeful curtailment of service , the permit holder
of stage carriage KL-58-M-670(Old No KL-11-AB-3737) applied for the
variation of permit for authorizing permanent curtailment of service to
Chottanikkara from Vyttila. This authority in the earlier sittings held on
23/02/2017, 17/05/2017, 20/01/2018, 17/03/2018, 19/05/2018,
19/01/2019 and 18/09/2019 considered the matter of variation for
curtailment of service from Vyttila to Chottanikkara, and rejected the same
on the following findings.
“The regular permit was initially granted considering the interest of
public to reach Chottanikkara, the famous pilgrim centre. After obtaining
regular permit, the permit holder is frequently curtailing service to
Chottanikkara without any reason,which is against the interest of public and
there is no necessity warranting U/R 145[6] of KMV Rules-1989. The permit
holder had submitted application for the variation of permit for curtailing
service from North Parur to Chottanikkara for a distance of 42 km. This
authority considered the application in the light of report of field officer. The
enquiry officer has reported that Chottanikkara is a famous pilgrim centre and
the proposed curtailment from North Parur to Chottanikkara will adversely
affect the travelling public and Students.Regional Transport Authority is
constituted under Motor Vehicles Act and hence the authority is bound to act
in accordance with Act and Rules. The act and rules are framed for the
convenience of the public. In this case, the proposed curtailment will cause
inconvenience to the public. Therefore, the proposed curtailment cannot be
allowed.In view of the aforesaid facts and circumstances, the application for
variation of permit is hereby rejected on public interest”.
The last decision of RTA was challenged in WPC No 13816/2021
before the Hon`ble High Court of Kerala and vide Judgment dated
26/08/2021,the Hon`ble Court find out that the Hon`ble Tribunal has
unambiguously declared that the petitioner is entitled to the variation
sought for and therefore,unless the said order has been set aside or
modified in terms of law,the RTA could not have rejected the claim of
petitioner.Hence Hon`ble Court set aside the decision of RTA and directed
RTA to re consider the application,adverting implicitly to the Judgment of
Hon`ble State Transport Appellate Tribunal in MVARP No 59/2019 within 45
days from the date of receipt of copy of the Judgment.
Vide Judgment of Hon`ble STAT in MVARP No 59/2019 dated
07/09/2019,in this Judgment the Hon`ble court find out that “According to
the learned council ,the word ‘variation’ used in the 2nd proviso takes the
meaning deviation and does not take within its ambit ‘curtailment’ of the
existing route.I find some force in the said argument.In the sub clause (3) to
section 80,the words variation,extension and curtailment as well in sub
clause (1) of the second proviso,there also along with the word variation the
words extension and curtailment as shown in the main body of the section
ought to have been mentioned.Needless to say,if the variation,extension and
curtailment takes within the ambit of the 1st clause of the second proviso ,the
second clause would become redundant.In support of the argument of the
learned counsel he has also cited the decision of the High Court of
Rajasthan in Narottam Paliwal Vs RTA Udaipur (AIR Rajasthan 1995
page 27) .It was held in the decision that the limit of 24 kms as prescribed in
sub section (sub clause ) 2 of the second proviso appended to sub section (3)
applies only to extension and not to curtailment.For all these reasons, I hold
that the second proviso applies only to variation and not to curtailment of the
existing route. In this case the revision petitioner proposed only a curtailment
of the existing route.Hence ,I hold that the impugned order rejecting the
application for variation is not sustainable.Since no other reason has been
shown in the impugned order reject the application for variation. I hold that
the revision petitioner is entitled for the variation sought for.In the result ,the
revision petition is allowed .The impugned order is set aside.The first
respondent,RTA Ernakulam, is directed to grant variation sought for”.
In view of the above Judgment,this authority is decided to grant
variation of permit as applied for without change in existing time.
This authority also considered the Renewal of permit
application.The total route length is 93 kms,in which 43kms lies under the
Jurisdiction of RTA,Thrissur.The enquiry officers reported that route is
objectionably overlapping the notified scheme published vide G.O (P) No
08/2017/Tran dated 23/03/2017.But this Regular permit is issued before
14/07/2009. There is no impediment to renew the permit for continuous
operation on the proposed route.Hence Renewal of regular permit is granted.
Item No : 45
Heard. This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-42-K-4580 on the route Gothuruth-High Court Jn. The
permit holder has filed application within the time limit prescribed under
section 81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 26/05/2015,vide item no
97,considered the renewal application and adjourned for reason that “The
route is having length of 17.8 km in which the portion of the route from
North Parur to Vadakkumpuram which is 4.4 km in length objectionably
overlaps Aluva-Vadakkumpuram complete exclusion scheme. Judgments of
Hon’ble High Court of Kerala in WP© No.4435/2011 and connected cases,
prohibited the renewal of regular permit issued on Aluva-Vadakkumpuram
Complete exclusion scheme reserved for the State Transport Undertaking.
KSRTC also objected the renewal of permits on the portions of Aluva-
Vadakkumpuram Scheme.Vide letter No.10689/B1/2014/Tran dtd
17/07/2014 the Government of Kerala has decided to formulate schemes
under section 99 of the MV Act for making an objective assessment on the
actual requirement of the KSRTC and in order to ensure sufficient travel
facilities to the general public. Hence this authority is not able to take a
decision in this situation. This authority is decided to wait for further orders
from the government in this regard. Hence adjourned.Secretary RTA has the
liberty to issue temporary permit to continue operation on public interest till
the final disposal of the application”.
The above legal impediment is still existence.Therefore this authority
is not able to take a decision in this situation.This authority is decided to
wait for further orders from the Government in this regard.Hence adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item no : 46
Heard. This is the application for the renewal of regular permit in respect of
stage carriage KL-07-AP-7239 operating on the route Mala-Aluva as
Ordinary Moffusil Service. The permit holder has filed application within the
time limit prescribed under Section 81[2] of MV Act,1988.
This authority elaborately considered the scope and applicability of
the renewal of permit in the light of existing notifications and connected file.
The regular permit was issued on 16/04/2005. The proposed route is
having length of 41.5 km and the route is objectionably overlaps
Trivandrum-Palakkad, Trivandrum-Kannur, Ernakulam-Thrissur notified
routes published vide GO(P) No. No.42/2009/Tran dtd 14/07/2009 ,which
is further modified as per GO(P) No.08/2017/Tran dtd 23/03/2017 and
Aluva-Vadakkumpuram Complete Exclusion scheme,vide Notification no
27106/TA2/65/PWD Dated 17/06/1965.
As the portion of the route from Aluva to Paravur Kavala is also
overlaps on GO(P) No 42/2009 dated 14/07/2009 ,the overlapping on
Aluva-Vadakkumpuram Scheme cannot be treated as objectionable. There is
no impediment to renew the permit for continuous operation on the
proposed route.Hence Renewal of regular permit is granted.
Item No 47
Perused the Judgement of Hon`ble State Transport Appellate Tribunal
(STAT) in MVAA No 44/2014 dated 16/08/2019.
Heard;The learned counsel represented the applicant and counsel
represented the KSRTC.This is the application for Renewal of permit and
replacement of vehicle in respect of Stage Carriage KL-17-A-6888 on the
route Poothotta –University .This authority in its earlier sitting held on
16/07/2013,vide item no 105 and 06/01/2014 vide item no 150 considered
and rejected on the ground that the vehicle was removed during the year
2010 and thereafter the permit holder had not operated service for the
conveyance of public.
The said decision of RTA,Ernakulam is challenged by permit holder
before the Hon`ble STAT in MVAA No 44/2014.As per the Judgment dated
16/08/2019,the Hon`ble Court “set aside the decision of RTA,Ernakulam
and directed to reconsider the application for renewal as well as replacement
on merits and pass orders in accordance with law after hearing all the
parties”.
This authority perused the Judgment of Hon`ble STAT in MVAA No
44/2014,wherein the Hon`ble STAT has set aside the decision of this
authority dated 16/08/2019 on the following findins-that,
The vehicle was removed from the permit during 2010 and thereafter
the permit holder did not operate service for the conveyance of the public
and as such findings of the RTA,Ernakulam that the appellant did not
operate service since 2010 is wrong.
This authority elaborately verified the findings of the Hon`ble STAT and
revealed the following,
On 29/10/2010,the permit holder had applied for clearance certificate
in respect of S/C KL-17-A-6888 without surrendering the regular permit .In
compliance of the Judgment of Hon`ble High Court of Kerala in WPC No
31028 of 2010,clearance certificate was issued in respect of the above Stage
Carriage by keeping the valid regular permit under suspended animation for
changing the ownership into the name of another person.Thereafter,the
permit holder failed to conduct service with another stage carriage with
effect from 29/10/2010 . On 26/05/2011 an application for Renewal of
permit was submitted by the permit holder without a valid vehicle.The said
application was considered by Secretary RTA and rejected on the ground
that the without a valid vehicle the regular permit has no existence and
hence the regular permit became cancelled or suspended one. The permit
holder filed a replacement application only on 28/07/2012 .In this case the
vehicle was removed from 29/10/2010, thereafter the permit holder had
not operated service for the conveyance of the travelling public.
The permit was granted by this authority for operating of regular
service for the conveyance facility to the general public without a break.But
the permit holder failed to do so.This action of permit holder caused refusal
of Stage Carriage service on the said route ,the passengers were put on to
untold miseries.Hence there is no need to renew the permit after a long
duration of 2 years.
On consideration of the above facts,this authority verified that the
findings rendered by the Hon`ble STAT is against the actual facts.Hence this
authority not in a position to renew the non operational and in fructuous
regular permit.
In the above findings ,the application for Renewal of Regular permit is
rejected.
Since the application for renewal of permit is rejected.The application
for the replacement of vehicle has no relevance.
Item no 48
Heard. This is the application for the renewal of regular permit in respect of
stage carriage KL-18-D-8199 operating on the route Aluva-Thoppumpady as
Ordinary City Service. The permit holder has not filed application within the
time limit prescribed under Section 81[2] of MV Act,1988.Hence he submit a
request to condone the delay in filing the application.
This authority elaborately considered the scope and applicability of
the renewal of permit in the light of existing notifications and connected file.
The regular permit was issued on 27/01/2005. The proposed route is
having length of 40 km and the route is objectionably overlaps Trivandrum-
Palakkad , Trivandrum-Kannur notified routes published vide GO(P) No.
No.42/2009/Tran dtd 14/07/2009 which is further modified as per GO(P)
No.08/2017/Tran dtd 23/03/2017 .The permit was issued before
14/07/2009.Hence there is no impediment to renew the permit for
continuous operation on the proposed route.
Therefore, the delay in filing application is condoned and the Secretary
RTA is permitted to renew the permit subject to the remittance of
compounding fee of Rs.7500/- for the permitless operation.
Item No : 49
Heard. This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-11-X-8919 on the route Gothuruth-Munambam. The
permit holder has filed application within the time limit prescribed under
section 81(2) of MV Act,1988.
This authority considered the application in detail .On perusal of file it
is seen that ,this authority in its sitting held on 17/05/2017,vide item no
49,considered the renewal application and adjourned for reason that “The
route is having length of 22 km in which the portion of the route from North
Parur to Vadakkumpuram which is 4.7 km in length objectionably overlaps
Aluva-Vadakkumpuram complete exclusion scheme. Judgments of Hon’ble
High Court of Kerala in WP© No.4435/2011 and connected cases, prohibited
the renewal of regular permit issued on Aluva-Vadakkumpuram Complete
exclusion scheme reserved for the State Transport Undertaking. KSRTC also
objected the renewal of permits on the portions of Aluva-Vadakkumpuram
Scheme.Vide letter No.10689/B1/2014/Tran dtd 17/07/2014 the
Government of Kerala has decided to formulate schemes under section 99 of
the MV Act for making an objective assessment on the actual requirement of
the KSRTC and in order to ensure sufficient travel facilities to the general
public. Hence this authority is not able to take a decision in this situation.
This authority is decided to wait for further orders from the government in
this regard. Hence adjourned.Secretary RTA has the liberty to issue
temporary permit to continue operation on public interest till the final
disposal of the application”.
The above legal impediment is still existence. Therefore this authority
is not able to take a decision in this situation. This authority is decided to
wait for further orders from the Government in this regard. Hence
adjourned.
Secretary RTA has the liberty to issue temporary permit to continue
operation on public interest till the final disposal of the application.
Item No.50
Heard.This is an application for the Renewal of Regular permit in respect of
Stage Carriage KL-16-8325 on the route Puthenvelikkara-Kodungallur-Mala
as ordinary Moffusil service.The permit holder has not filed application
within the time limit prescribed under section 81(2) of MV Act,1988. Hence
he submitted a request to condone the delay in filing the application.
This authority considered the application in detail .On perusal of file it
is seen that ,the route is having length of 39.5 km in which the portion of
the route in question from North Parur to Vedimara which is 1.5 km in
length objectionably overlaps Aluva-Vadakkumpuram complete exclusion
scheme ,which is exclusively reserved for the State Transport Undertaking.
Judgments of Hon’ble High Court of Kerala in WP© No.4435/2011 and
connected cases, prohibited the renewal of regular permit issued on Aluva-
Vadakkumpuram Complete exclusion scheme reserved for the State
Transport Undertaking. KSRTC also objected the renewal of permits on the
portions of Aluva-Vadakkumpuram Scheme. Vide letter
No.10689/B1/2014/Tran dtd 17/07/2014 the Government of Kerala has
decided to formulate schemes under section 99 of the MV Act for making an
objective assessment on the actual requirement of the KSRTC and in order
to ensure sufficient travel facilities to the general public. Hence this
authority is not able to take a decision in this situation. This authority is
decided to wait for further orders from the government in this regard. Hence
delay in filing the application is condoned and decision on application for
the renewal of regular permit is adjourned.
The Secretary RTA is permitted to issue temporary permits for
durations of 4 months U/S 87[1]d of MV Act in favour of the permit holder
to continue operation on the same route on public interest.
Item No 51
Heard. This is an application for transfer of regular permit in respect of S/C
KL-05-U-592 operating on the route Thuthiyoor-Fort Kochi from the name
of first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 52
Perused the Judgment of Hon`ble High Court of Kerala in WPC No 5671 of
2021 Dated 17/03/2021.
Heard; This is an application for transfer of regular permit in respect of S/C
KL-05-AB-2446 operating on the route Aluva-Fort Kochi from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 53
Heard;the learned counsel represented the applicants.This is an application for
Transfer of permit in respect of Stage Carriage KL-05-T-1519 on the route Aluva-
Choondy as Ordinary moffusil service on the strength of Regular permit valid upto
27/10/2022.This authority considered the application and connected files and it is
revealed that,
The proposed application is filed by Sri.Merlin ,Who is the power of attorney
holder of the Sri.George A T (permit holder) and Sri.Eldho Varghese.On perused the
perused the power of attorney ,it is seen that,there is no power is assigned for
Transfer of permit to the another person.More over ,the secretary RTA directed at
the time of hearing to the power of attorney holder to produce the Transfer of
permit allowable Power of attorney .But he has failed to produce the same .Hence
this application cannot be considered as a proper and bonafide one.
Therefore the application for the Transfer of permit is hereby rejected.
Item No 54
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-AQ-644 operating on the route Mambrakadavu-Angamaly-
Perumbavoor-Palissery-Karamattom from the name of first applicant to the
name of second applicant. Transfer of permit allowed subject to the
production of no objection certificate from the financier, if applicable and
clearance of Govt. dues, if any.
Item No 55
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-AS-1071 operating on the route Cheranellore-Fortkochi from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 56
Perused the Judgment of Hon`ble High Court of Kerala in WPC No
16074/2021 dated 25/08/2021.
Heard; This is an application for transfer of regular permit in respect of S/C
KL-38-H-1422 operating on the route Ponekkara-Edakochi from the name
of first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 57
Heard.This is an application for transfer of regular permit in respect of S/C
KL-65-C-1572 operating on the route Cheranellore-Mattanchery from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 58
Heard.This is an application for transfer of regular permit in respect of S/C
KL-02-S-2951 operating on the route Edakochi-Fortkochi from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 59
Heard.This is an application for transfer of regular permit in respect of S/C
KL-05-X-2601 operating on the route North Paravur-High Court Jn from
the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 60
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-BD-3408 operating on the route Cherthala-Thoppumpady from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 61
Heard.This is an application for transfer of regular permit in respect of S/C
KL-38-2596 operating on the route Eloor ferry-Munambam from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 62
Heard.This is an application for transfer of regular permit in respect of S/C
KL-39-F-3292 operating on the route Kothad Ferry-Chottanikkara from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 63
Heard.This is an application for transfer of regular permit in respect of S/C
KL-40-3177 operating on the route Pookkattupady-Fortkochi from the name
of first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 64
Heard.This is an application for transfer of regular permit in respect of S/C
KL-33-G-3229 operating on the route Cheranellore-Aluva from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 65
Heard.This is an application for transfer of regular permit in respect of S/C
KL-37-A-4930 operating on the route Koothattukulam-Kaloor from the name
of first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 66
Heard.This is an application for Transfer of Permit (Death) u/s 82(2) of MV
Act,1988 ,in respect of S/C KL-07-AQ-6111 on the route Kakkanad-W.
Island. Swalih Muhammed T K,Son of the deceased permit holder has
applied for Transfer of permit (death) u/s 82(2) of MV Act,1988.On perusal
of file ,it is revealed that the Secretary RTA was heard all legal heirs of the
deceased permit holder and all legal heirs were submitted their consent for
the transfer of permit into the name of Swalih Muhammed T.K,Son of
deceased permit holder.Therefore Transfer of permit in respect of S/C KL-
07-AQ-6111 u/s 82(2) of MV Act ,is allowed as applied for subject to the
clearance of Government dues,if any.
Item No 67
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-AX-6444 operating on the route Irimpanam-Kakkanad from the name
of first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 68
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-BC-5859 operating on the route Kothad Ferry-Poothotta from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 69
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-BG-5631 operating on the route Pookattupady-Edakochi from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 70
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-BK-5291 operating on the route Ponekkara-Pananghad from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 71
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-CG-6192 operating on the route Kumbalam-Aluva from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 72
Heard.This is an application for transfer of regular permit in respect of S/C
KL-41-A-5686 operating on the route Munnorpilly-Perumbavoor from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 73
Heard.This is an application for transfer of regular permit in respect of S/C
KL-43-A-6669 operating on the route Fortkochi-W.Island from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 74
Heard.This is an application for transfer of regular permit in respect of S/C
KL-44-5054 operating on the route KMP Nagar-Fortkochi from the name of
first applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 75
Perused the Judgment of Hon`ble STAT in MVAA No 107/2018 dated
14/11/2019.
Heard.This is an application for Transfer of permit in respect of Stage
carriage KL-39-F-5146 on the route Thalayolaparambu-Kaloor as ordinary
Moffusil service.This authority in its sitting held on 20/01/2018 considered
this application and rejected. Aggrevied by this decision, the permit holder
filed MVAA No 107/2018,vide Judgment dated 14/11/2019,the Hon`ble
court set aside the decision of RTA and directed to reconsider the
application for Transfer in accordance with section 82(1) of MV Act,1988
and Rule 178 of KMV Rules,1989.
In compliance the Judgment of Hon`ble STAT in MVAA No
107/2018,this authority reconsidered the transfer of permit application in
respect of S/C KL-39-F-5146 and allowed as applied for subject to the
production of no objection certificate from the financier,if applicable and
clearance of Government dues ,if any.
Item No 76
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-BC-7114 operating on the route Aluva-Thevara from the name of first
applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 77
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-AR-9758 operating on the route Palankadavu-Puthukalavattom from
the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 78
Heard.This is an application for transfer of regular permit in respect of S/C
KL-07-AW-9730 operating on the route Kakkanad-Poochakkal from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 79
Heard.This is an application for transfer of regular permit in respect of S/C
KL-40-A-8355 operating on the route Puthukalavattom-Perumanoor from
the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 80
Heard.This is an application for Transfer of permit in respect of S/C KL-08-Z-9700
on the route Ernakulam High Court Jn-Kodungalloor.On perusing the file, it is
revealed that the report furnished by the enquiry officer is not self explanatory.
Therefore ,Secretary RTA is directed to seek further specific report from the enquiry
officer regarding the possession of the vehicle, financial stability of 2nd applicant
and any disqualification u/r 178 of KMV Rules,1989.Hence adjourned.
Item No 81
Heard.This is an application for transfer of regular permit in respect of S/C
KL-56-C-7707 operating on the route Vyttila Hub-North Paravur from the
name of first applicant to the name of second applicant. Transfer of permit
allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Item No 82
Heard.This is an application for transfer of regular permit in respect of S/C
KL-67-B-7509 operating on the route Pala-Kaloor from the name of first
applicant to the name of second applicant. Transfer of permit allowed
subject to the production of no objection certificate from the financier, if
applicable and clearance of Govt. dues, if any.
Item No 83
Heard.Transfer of permit(Death) in respect of S/C KL-43-A-7832 on the
route Kumbalanghy-Cheranellore.Sajan V.T,Son of the deceased permit
holder has applied for Transfer of permit (death) u/s 82(2) of MV
Act,1988.On perusal of file ,it is revealed that the Secretary RTA was heard
all legal heirs of the deceased permit holder and all legal heirs were
submitted their consent for the transfer of permit into the name of Sajan
.V.T,Son of deceased permit holder.Therefore,Transfer of permit in respect of
S/C KL-43-A-7832, u/s 82(2) of MV Act ,is allowed as applied for subject to
the clearance of Government dues,if any.
Item No 84
Heard. This is an application for replacement of the stage carriage KL-08-
AL-4555, covered by a regular permit valid up to 12/12/2022 , by a Later
model vehicle KL-17-U-7320 possessed under lease agreement .This
authority considered the application in detail.On perused the file ,it is
revealed this is a case where a older model vehicle (2006 model) covered by a
stage carriage permit is sought to be replaced by a later model (2020 model)
stage carriage KL-17-U-7320 possessed under lease agreement. The material
difference is below 25 % and the later model vehicle will provide more
travelling facility than an older model vehicle.Therefore the Replacement of
the vehicle is granted subject to the compliance of Rule 174 of KMV Rules
1989.
Item No 85
Heard the applicant.This is the application for Renewal of Permit in respect
of A/R KL-07-CN-8149.The permit holder had not filed application within
the time limit prescribed under 81(2) of MV Act,1988.Hence he requested to
condone the delay.This authority considered the application in detail.There
is no legal impediment to renew the permit for continuous operation.This
authority satisfied with the explanation submitted by the permit
holder.Hence delay is condoned and Renewal of permit is granted.
Item No 86
Heard the applicant.This is the application for Renewal of Permit in respect
of A/R KL-07-BX-3052.The permit holder had not filed application within
the time limit prescribed under 81(2) of MV Act.Hence she requested to
condone the delay.This authority considered the application in detail.There
is no legal impediment to renew the permit for continuous operation.This
authority satisfied with the explanation submitted by the permit
holder.Hence delay is condoned and Renewal of permit is granted.
Item No 87
This is an application for withdrawal of renewal of regular permit application
in respect of Stage Carriage KL-07-AW-4668 operating on the route Vyppin-
Maliyankara as Ordinary Moffusil service. The regular permit validity was
expired on 08/09/2014.The permit holder had applied for renewal of permit
application and it was considered by RTA,Ernakulam in its sitting held on
17/08/2015 and adjourned on the ground that the route portion is
objectionably overlaps Aluva- Vadakkumpuram complete exclusion
scheme.However,the RTA permitted the regular permit holder to operate
service with temporary permit u/s 87(1)d of MV Act,1988.Then the permit
holder conducted service on the strength of temporary permit which was
valid upto 13/02/2018.During these time,the route bus attained 15 years of
age as on 01/05/2015 and was not serviceable.So he possessed another
stage carriage KL-38-2752 under lease agreement .Thereafter on
08/02/2018,the owner of Stage carriage KL 38 2752 repossessed the vehicle
. After this ,the permit holder had not conducted service with the Stage
Carriage KL-07-AW-4668 or another stage carriage.Hence it is clear that the
permit holder is not able to maintain a Stage carriage service for providing
better conveyance facility to the passengers without a break.Therefore the
Secretary RTA issued a showcause notice u/r 152 of KMV Rules,1989 on
16/08/2019.No reply received from the permit holder .On 16/10/2020 the
permit holder submitted a Form G application and stated that he intends to
dismantle the Stage carriage KL-07-AW-4668 since it is in dilapidated
condition.Later on 24/11/2020,the permit holder submitted the withdrawal
of permit renewal application and stated that he is not financially sound to
produce another stage carriage vehicle.
On perused the application and connected file,it is revealed that the
permit holder failed to conduct service with another stage carriage with
effect from 13/02/2018.The action of permit holder caused refusal of stage
carriage service on the said route where there is lack of service and the
passengers were put on to untold miseries. Hence it is clear that the permit
holder is not able to maintain a Stage Carriage service for providing better
conveyance facility to the general public without a break.Moreover ,he has
confessed that he is not financially sound to produce another stage carriage
vehicle for conducting service.
The permit was granted by this authority for the operation of regular
service for the convenience of the travelling public.But in this case the
permit holder failed to do so.Moreover he has applied for withdrawal of
renewal of permit application.It is clear that he is not willing to conduct the
service with this permit.In this case ,the secrtary RTA issued showcause
notice to the permit holder u/r 152 of KMV Rules,1989.
“As per Rule 152 of KMV Rules,1989,the vehicle shall be so maintained
as to be available for the service for which the permit was granted,for the
entire period of currency of the permit and the permit is liable to be suspended
or cancelled,after due notice to the permit holder,if the vehicle has not been
used for the purpose for which the permit was granted ,for any day in the
case of a stage carriage or for a continous period of fifteen days .In this case
the applicant is not operating service for a long period and failed to serve the
need and convenience of public.Hence the permit is liable to be cancelled”.
Therefore, this authority is of considered opinion that the permit
holder is not qualified for the continuance operation of the stage carriage
service and he is incapable of maintain a stage carriage providing better
service to the public. Hence the application is hereby rejected and the
regular permit 7/01/1994 issued to stage carriage KL-07-AW-4668 on the
route Maliankara-Vyppin is hereby cancelled.
Item No 88
Heard,the learned counsel represented the permit holder .This application is
placed before for taking action against the regular permit no 7/10028/2004
issued to Stage Carriage KL-40-A-3038 on the route Aluva-Konthuruthy in
the vacancy of KCE-7911.
This authority issued a Regular permit no 7/10028/2004 in respect of
stage carriage KL-40-A-3038 on the route Aluva-Konthuruthy as city
service.The permit of the vehicle was expired on 26/01/2014.The permit
holder had filed first application within the time limit prescribed u/s 81(2) of
the MV Act,1988.But this application was not processed by Secretary RTA
,since the vehicle has tax due.After a long 5 years ,the permit holder had
filed another renewal of permit application,which is a belated one by 261
days. After this he had applied for Replacement of vehicle with another later
model vehicle.
This authority in its meeting held on 08/02/2021,vide item no
18,considered the application and rejected the renewal of permit and
directed Secretary RTA to issue showcause notice u/r 152 of Kerala Motor
Vehicles Rules,1989.On 28/04/2021 an explanation received from the
permit holder through his Power of Attorney holder Sri.Nassar .V.K,Vellanji
House,Manalimukku, NAD P O,Aluva.On perused the explanation ,it is
revealed that the permit holder submitted replacement application after the
5 years from the validity of the permit,ie on 31/10/2019. In this case ,the
permit holder is failed to conduct service for a long five years with another
stage carriage with effect from 31/07/2013.On that date the said vehicle
was seized by the Enforcement Directorate,Ernakulam and it is still under
the custody of the said agency.
The permit was granted by this authority for operating of regular
service for the conveyance facility to the general public without a break.But
the permit holder failed to do so.This action of permit holder caused refusal
of Stage Carriage service on the said route ,the passengers were put on to
untold miseries.Hence there is no need to renew the permit after a long
duration of 5 years.
In the above circumstances,the explanation is submitted by the
permit holder is not found satisfactory.
Therefore, this authority is of considered opinion that the permit
holder is not qualified for the continuance operation of the stage carriage
service and he is incapable of maintain a stage carriage providing better
service to the public. Hence the application is hereby rejected and the
regular permit 7/10028/20044 issued to stage carriage KL-40-A-3038 on
the route Aluva-Konthuruthy is hereby cancelled.
Item No 89
Action taken by the Secretary RTA for the cancellation of Regular Permit No
7/433/2012 on the route Kalady-Angamaly in respect of Stage Carriage KL-
07-AP-3456 on behalf of this authority is hereby ratified.
Item No 90
Action taken by the Secretary RTA for the cancellation of Regular permit no
7/504/2005 on the route Cheranelloore-Mattanchery in respect of Stage
Carriage KL-07-BK-5291 on behalf of this authority is hereby ratified.
Item No.91
Action taken by the Secretary RTA for the cancellation of regular permit no
7/100001/1994 on the route South Chittoor Ferry-Kadavanthra in respect
of stage carriage KL-07-BN-8487 on behalf of this authority is hereby
ratified.
Item No 92
Action taken by the Secretary RTA for the cancellation of Regular permit
7/3418/2018 on the route Mulavukad North-Highcourt Jn in respect of
Stage Carriage KL-07-CD-9438 on behalf of this authority is hereby ratified.
Item No 93
Action taken by RTA,Ernakulam through Circulation for the Replacement of
Stage Carriage KL-16-C-9779 is hereby regularized.
Item No 94
The applicant and the permit holder is absent in the meeting.This is the
complaint relating the excess ticket fare collecting from the complainant
Sri.P A Abdhul Khadir by the conductor in respect of Stage Carriage KL-07-
AT-9909 on the route Aluva -Ernakulam.As per the complaint,he stated that
during the period from 25/09/2020 to 09/10/2020 an excess fare
charge,more than 25% which was allowed by the Government of Kerala vide
GO (P) No 37/2020/Trans, collected from him on going travel from ESI
Dispensary to Aluva.The normal ticket rate is Rs.13/- only but the said
stage carriage collected Rs.19/- in the above said periods. An enquiry
conducted through field officer and he stated that the complaint is a
genuine one.
In this case ,the permit holder committed offence u/s 84(c) of MV
Act,1988 and law mandate action on permit u/s 86 (1)a of MV Act,1988.
The permit holder is given an option to remit compounding fee of Rs.7500/-
in lieu of suspension/Cancellation of permit.If the permit holder is failed to
do so,
1.Secretary RTA is directed to suspend the permit of the Stage Carriage KL-
07-AT-9909 for a duration of 1 month . If the illegality reported in future,the
permits of the concerned vehicle will be revoked.
2. Secretary RTA is directed to suspend the conductor license for a duration
of one month .
Item No 95
Perused the Judgment of Hon`ble State Transport Appellate Tribunal in
MVAA No 39/2018 dated 06/10/2020.
The permit holder of Stage Carriage KL-39-E-8223 is absent in the
meeting.This is a case relating the misbehaviour of bus crews ,which made
violence in a public place resulted in the injury of the students.This
authority in its earlier sittings held on 20/01/2018,vide item no 75 and on
18/09/2019,vide item no 27 considered the issue in detail in view of the
Motor Vehicles Act and Rules made there under and decided to suspend the
regular permit issued to stage carriage KL-39-E-8223 for a duration of three
months.Moreover,the Licensing authority is directed to disqualify the license
issued to the Crews involved in the case without delay.
Aggrieved by the decision of RTA,the permit holder filed an appeal
before the Hon`ble STAT in MVAA No 39/2018 ,vide Judgment dated
06/10/2020,the Hon`ble court pronounced that “there is no option is
allowed as per sub clause (5) of Section 86 of MV Act,1988 to the appellant,no
reason has been given in the impugned order.To that extent, the impugned
order is liable to be interfered with. In the result,the revision petition is
disposed of as follows;
The 1st respondent,RTA,Ernakulam,is directed to reconsider whether
the appellant could be extended the benefit of sub clause (5) of Section 86 of
the Motor Vehicles Act taking into account the relevant provisions including
Rule 145 (8) of the Kerala Motor Vehicles Rules,1989 and facts and
circumstances of the case after hearing both sides”.
In complying the above order,this authority reconsidered the matter in
this sitting,but the permit holder is absent.This authority in its previous
sitting considered this matter and decided to suspend the regular permit of
Stage Carriage KL39E3223 for a period of 3months without giving the
benefit of sub clause(5) of section 86 of MV Act,1988.The reason is that,the
offence is entirely different from other offences relating with the Motor
Vehicles Act and Rules. In this case ,the bus crews attacked the passengers
,which resulted the injury of the students and police officials filed an FIR
against the bus crews.It is the duty of the RTA to ensure that similar type of
criminal offences are not to be repeated by any operators in
future.Therefore,the earlier decision was taken by this authority is an apt
one.Hence,the benefit of sub clause 5 of section 86 of MV Act,1988 and Sub
Rule 8 of Rule 145 of KMV Rules,1989 are not attractive in this case and
hence this authority denied to compound the offence by remitting fine in lieu
of action on permit.
Therefore ,this authority is decided to suspend the regular permit
issued to stage carriage KL-39-E-8223 for a duration of three months with
effect from 01/01/2022.
The secretary RTA is entrusted to ensure the above decision is
complied.
Item No 96
Action taken by RTA,Ernakulam through Circulation for the Grant of Fresh
Permit in respect of Stage Carriage KL-07-AR-3694 on the route North
Paravur-Eloor FACT-Amritha Hospital,Pathalam-Edappally-Vyttila Hub is
hereby regularized.
Item No 97
Action taken by RTA,Ernakulam through Circulation for the Grant of Fresh
Permit in respect of Stage Carriage KL-07-AN-9426 or KL-07-AK-6107 or
Suitable vehicle on the route Nayathode Airport Jn-Angamaly-Mala-Manjaly
is hereby regularized.
Item No .98
Heard;This is a request submitted by Sri.V V Praveen,74 Division
Councilor, Cochin Corporation for sanctioning of new bus stop at the
Junction of Thattazham Road (near Pachalam Jn) with Chittoor road.The
enquiry officer reported that, there is an existing bus stop only a 300 meter
away. Moreover there is a railway tracks and a railway crossing is also
situated near the proposed bus stop.There is no sufficient space for the new
bus stop.On consideration of report of the enquiry officer,this authority felt
that if the proposal is allowed it will be against the road safety aspects.
In the above circumstances the proposal for new bus stop at
Thattazham road is hereby Rejected.
Item No 99
Heard;the applicant and objectors.This is a request submitted by Sri.T
A George ,Thaippadath House,Kannamaly P O,Kochi for sanctioning new
bus shelter in the existing bus stop near Kannamaly Church.The enquiry
officer has reported that “the proposed bus shelter is near the wall of
Smt.Annie P G and she has complained that ,it will obstruct access to their
home and the complaint is genuine one ,because the distance from the gate
and proposed bus shelter is only 10.50 meter.The size provided for the bus
shelter is 350x270.It is not possible to implement this measurement in this
place.The road there is not wide enough,only 7meter width. A tree is situated
50cm away from the road. Moreover it will be lead, Traffic jam and
obstruction in pedestrians and may be occur accident while overtaking .Hence
it is advised to build the proposed bus shelter in the nearest convenient place
,having sufficient road width”. Moreover, an objection filed by Smt.Annie P G
against the proposed bus shelter,since it will obstruct access to their home.
This authority elaborately considered the scope and applicability of
the proposed bus shelter on the basis of enquiry report of field officer and
objection raised by Smt.Annie.P.G. The proposed bus shelter will obstruct
access the complainant home,because the distance from the gate and
proposed bus shelter is only 10.50 meter.The size provided for the bus
shelter is 350x270.The proposed place is not enough space for building bus
shelter,the road width is only 7 meter.Moreover,it will lead traffic jam and
obstruction in pedestrians. On consideration of report of the enquiry
officer,this authority felt that if the proposal is allowed it will be against the
road safety aspects.
In the above circumstances,the proposal for the new bus shelter
at Kannamaly Church is hereby rejected.
Item No 100
1.Perused the Judgment of Hon`ble High Court of Kerala in WPC No
17863/2020 dated 16/08/2021
2.Heard; the learned counsel represented the shop owner .This is an issue
relating to the parking of Autorikshaws in front of shop at Pandikudy.The
shop owner ,Sri. Sharon Thomas, filed a Writ petition before the Hon`ble
High Court of Kerala in WPC No 17863/2020.Vide Judgment dated
16/07/2021,the Hon`ble Court pronounced that “the parking place is
identified by the 2nd respondent,Cochin Corporation,for the autorickshaws as
per serial no 93 in Ext p9 proceedings of the 2nd respondent.The petitioner is
aggrieved by the same .The main grievance of the petitioner is that the ingress
and egress to the petitioner`s shop is blocked by the autorickshaws.I do not
want to make any observation about the same.If the petitioner is aggrieved by
Ext P9,the petitioner is free to file a representation narrating all his grievance
before the 7th respondent,RTA Ernakulam. If such a representation is received
,the additional 7th respondent will consider the same after hearing the
petitioner,2nd respondent and the representatives of 5th respondent,Pandikudy
Auto Drivers Association (PADA). The writ petition is disposed in the manner:
(1) The petitioner is free to file a representation narrating his grievance against
Ext P9 before the RTA within 3weeks. (2) If such a represtation is received,the
additional 7th respondent will hear the petitioner,Secretary Cochin Corporation
and representatives of Pandikuty Auto Drivers and pass appropriate orders in
it as expeditiously as possible ,at any rate ,within 5 months from the date of
receipt of a copy of this Judgment”.
This authority considered the application in detail with the Judgment
and connected files and it is revealed that,as per the Direction of Hon`ble
Court,the petitioner submit a representation before the Secretary
RTA,Ernakulam on16/08/2021.Afterthis,the secretary RTA conducted an
enquiry through the Joint Regional Transport Officer ,Mattanchery and
submitted report. But the Secretary Cochin Corporation and
Representatives of Pandikuty Auto Drivers are not present in the
meeting,only the authorized representative of shop owner present in the
meeting.Hence this authority is not able to take a decision in this situation.
Therefore,the Secretary RTA is directed
1. To submit a detailed remarks in consultation with Secretary ,Cochin
Corporation and Sri.Sharon Thomas (Shop owner and petitioner) and
Representatives of Pandikudy Auto Drivers Assosication ,then place
the matter in the next sitting without fail.
2. to file an extension of time before the Hon`ble High Court of Kerala in
WPC No 17863/2020 to the completion of above petition.
Hence this matter is adjourned for next sitting.
Item No 101
Applicant is absent .Hence adjourned.
Item No 102
Applicant is absent. On perused the file,as per the report of enquiry officer,it
is revealed that the applicant not provided sufficient facilities. Therefore, the
secretary RTA is directed to conduct a fresh enquiry and place the matter in
the next sitting.Hence adjourned.
Item No 103
This authority considered the matter in detail.This is the matter
relating the Digitalization of Time sheet of Stage Carriages to the Digital
platform.Now a days ,there is no software to access running time of Stage
Carriages to the General public.The Transport commissioner considered the
issue in detail and decided to digitalize the route data and running time of
all Stage Carriages in the State.For this purpose ,a Digital platform is
created by Motor Vehicles Department and name given as Root Management
System(RMS).
The secretary RTA is directed to take necessary action for completing
the digitalization process.By updating entire Regular permit,settled timings
and route details in the RMS portal.After completing the entry level, an
opportunity will be given to the permit holders to verify the data with
original time schedule in their hand.The above process should be completed
within three months and the matter will be discussed thereafter.
Item No 104
All actions taken by Secretary RTA on behalf of this authority are hereby
ratified.
Item No 105
Nil
Item No 106
Will be informed later.
Supplimentary Item no 1
This is the matter relating the non permission of KSRTC stage carriage
buses to M G Road. As per the letter of Transport Secretary ,“KSRTC Buses
from Thoppumpady and Vyttila were being reached KSRTC depot via M G
Road.But at the time of construction of Metro rail the M G Road was closed by
Barricades and KSRTC bus services diverted via Kadavanthra .Even after the
completion of the metro rail work,the entry ban on M.G.Road is still in force to
KSRTC buses and in the same time other private buses are conducting service
through M G Road.Moreover, Deluxe buses of KSRTC from Alappuzha and
Thrissur are also restricted to entry in the Ernakulam City limit via M G
Road.The above restriction is resulted into the hardship to the KSRTC
Passengers.They have compelled to use other private buses to reach M G
Road and other city points.It leads huge revenue loss , more diesel expenses
to the KSRTC and also the passengers are raising complaints against the
divertion of route”.
This authority considered the matter in detail .The Asst Commissioner
of Traffic police attended the meeting and reported that “there was no
restriction on KSRTC buses entering to MG Road, but a ban on turning from
the MG Road to the KSRTC Bus stand for reducing traffic congestion and
avoiding traffic block in M G Road”. In the same time ,this authority feels
that the above restriction is resulted into the hardship to the KSRTC
passengers,whose are travelling from Thoppumpady and Vyttila.For solving
the above issues ,this authority decided to conduct a meeting with the
officials of KSRTC,Traffic police authorities and other affected parties .
Hence decision is adjourned.
Supplementary Item No.2
Heard. This is to consider the application for transfer of regular permit in
respect of S/C KL 07 AR 7475 operating on the route Aluva-Mattanchery
from the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Supplementary Item No.3
Heard. This is to consider the application for transfer of regular permit in
respect of S/C KL 42 C 5690 operating on the route Aluva-S.Chittoor Ferry
from the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Supplementary Item No.4
Heard. This is to consider the application for transfer of regular permit in
respect of S/C KL 04 Q 7934 operating on the route Aluva-Panangad from
the name of first applicant to the name of second applicant. Transfer of
permit allowed subject to the production of no objection certificate from the
financier, if applicable and clearance of Govt. dues, if any.
Sri.Jafar Malik I.A.S
District Collector & Chairman RTA
Ernakulam.
Sri.K.Karthik I.P.S
District Police Chief & Member RTA
Ernakulam