Davis-Besse Unit 1 Updated Final Safety Analysis Report

119
Davis-Besse Unit 1 Updated Final Safety Analysis Report 8-i UFSAR Rev 30 10/2014 SECTION 8 TABLE OF CONTENTS Section Title Page 8.0 ELECTRICAL POWER 8.1-1 8.1 INTRODUCTION 8.1-1 8.1.1 Utility Grid 8.1-1 8.1.2 Onsite Systems 8.1-1 8.1.2.1 Main Generation System 8.1-1 8.1.3 Essential Functions 8.1-3 8.1.4 Essential Loads 8.1-4 8.1.5 Design Bases 8.1-4 8.2 OFFSITE POWER SYSTEM 8.2-1 8.2.1 Description 8.2-1 8.2.1.1 Reliability Consideration 8.2-1 8.2.1.2 Stability Analysis 8.2-3 8.2.1.3 Switchyard DC System 8.2-4 8.2.1.4 Switchyard Systems 8.2-4 8.3 ONSITE POWER SYSTEMS 8.3-1 8.3.1 AC Power System 8.3-1 8.3.1.1 Description 8.3-1 8.3.1.1.1 Unit Auxiliary and Startup Transformers 8.3-2 8.3.1.1.2 13800 Volt Auxiliary System 8.3-2 8.3.1.1.3 4160 Volt Auxiliary System 8.3-3 8.3.1.1.4 Diesel Generators 8.3-5 8.3.1.1.4.1 Emergency Diesel Generators 8.3-5 8.3.1.1.4.2 Alternate AC Source – Station Blackout Diesel Generator 8.3-15 8.3.1.1.5 480V AC Auxiliary System 8.3-16 8.3.1.1.6 120V AC Auxiliary System 8.3-19 8.3.1.1.7 Channels 8.3-20 8.3.1.1.8 Physical Arrangement of the AC Electrical System Components 8.3-20 8.3.1.1.9 Tests and Inspections 8.3-23 8.3.1.1.10 Administratively Controlled Devices 8.3-24 8.3.1.1.11 Cross Ties Between MCC E11B and F11A 8.3-24 8.3.1.1.12 Motors 8.3-24 8.3.1.2 Analysis 8.3-24 8.3.1.2.1 Switching 8.3-25 8.3.1.2.2 Independent Circuits 8.3-25 8.3.1.2.3 Onsite Standby Emergency Diesel Generator Units 8.3-25 8.3.1.2.4 Power Distribution System 8.3-25 8.3.1.2.5 DELETED

Transcript of Davis-Besse Unit 1 Updated Final Safety Analysis Report

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-i UFSAR Rev 30 10/2014

SECTION 8

TABLE OF CONTENTS Section Title Page 8.0 ELECTRICAL POWER 8.1-1 8.1 INTRODUCTION 8.1-1 8.1.1 Utility Grid 8.1-1 8.1.2 Onsite Systems 8.1-1 8.1.2.1 Main Generation System 8.1-1 8.1.3 Essential Functions 8.1-3 8.1.4 Essential Loads 8.1-4 8.1.5 Design Bases 8.1-4 8.2 OFFSITE POWER SYSTEM 8.2-1 8.2.1 Description 8.2-1 8.2.1.1 Reliability Consideration 8.2-1 8.2.1.2 Stability Analysis 8.2-3 8.2.1.3 Switchyard DC System 8.2-4 8.2.1.4 Switchyard Systems 8.2-4 8.3 ONSITE POWER SYSTEMS 8.3-1 8.3.1 AC Power System 8.3-1 8.3.1.1 Description 8.3-1 8.3.1.1.1 Unit Auxiliary and Startup Transformers 8.3-2 8.3.1.1.2 13800 Volt Auxiliary System 8.3-2 8.3.1.1.3 4160 Volt Auxiliary System 8.3-3 8.3.1.1.4 Diesel Generators 8.3-5 8.3.1.1.4.1 Emergency Diesel Generators 8.3-5 8.3.1.1.4.2 Alternate AC Source – Station Blackout Diesel Generator 8.3-15 8.3.1.1.5 480V AC Auxiliary System 8.3-16 8.3.1.1.6 120V AC Auxiliary System 8.3-19 8.3.1.1.7 Channels 8.3-20 8.3.1.1.8 Physical Arrangement of the AC Electrical System Components 8.3-20 8.3.1.1.9 Tests and Inspections 8.3-23 8.3.1.1.10 Administratively Controlled Devices 8.3-24 8.3.1.1.11 Cross Ties Between MCC E11B and F11A 8.3-24 8.3.1.1.12 Motors 8.3-24 8.3.1.2 Analysis 8.3-24 8.3.1.2.1 Switching 8.3-25 8.3.1.2.2 Independent Circuits 8.3-25 8.3.1.2.3 Onsite Standby Emergency Diesel Generator Units 8.3-25 8.3.1.2.4 Power Distribution System 8.3-25 8.3.1.2.5 DELETED

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-ii UFSAR Rev 30 10/2014

TABLE OF CONTENTS (CONTINUED) Section Title Page 8.3.1.2.6 Parallel Operation 8.3-25 8.3.1.2.7 Testing 8.3-25 8.3.1.2.8 AC Electrical System 8.3-25 8.3.1.2.9 Controls 8.3-26 8.3.1.2.10 Electric Power 8.3-26 8.3.1.2.11 Protection Systems 8.3-26 8.3.1.2.12 Instrumentation 8.3-26 8.3.1.2.13 Periodic Testing 8.3-26 8.3.1.2.14 Cables and Raceway Functions 8.3-26 8.3.1.2.15 Cable 8.3-31 8.3.1.2.16 Safety Feature Actuation System (SFAS) and Reactor Protection System 8.3-31 8.3.1.2.17 Markers 8.3-32 8.3.1.2.18 Essential Cables 8.3-32 8.3.1.2.19 Power Cables 8.3-33 8.3.1.2.20 Routing of Class 1E Circuits 8.3-33 8.3.1.2.21 Electrical Conductors 8.3-35 8.3.1.2.22 Base Ampacity Ratings of Cables 8.3-35 8.3.1.2.23 AC Power Circuits 8.3-36 8.3.1.2.24 Cables for Reactor Protection Systems 8.3-36 8.3.1.2.25 Redundant Class 1E Instruments 8.3-36 8.3.1.2.26 Cable Spreading Room 8.3-39 8.3.1.2.27 Circuit Schedules and Connection Diagrams 8.3-39 8.3.1.2.28 Q-List Items 8.3-39 8.3.1.2.29 Penetrations 8.3-40 8.3.1.2.30 Cable for Class 1E Service 8.3-42 8.3.2 DC Power System 8.3-42 8.3.2.1 Description 8.3-42 8.3.2.1.1 DC Motor Control Centers 8.3-42 8.3.2.1.2 Station Batteries 8.3-43 8.3.2.1.3 Battery Chargers 8.3-44 8.3.2.1.4 Essential 125V DC Panels 8.3-44 8.3.2.1.5 Rectifiers 8.3-46 8.3.2.1.6 Monitoring and Surveillance 8.3-47 8.3.2.1.7 Physical Arrangement of DC Electrical System Components 8.3-48 8.3.2.1.8 DELETED 8.3.2.1.9 Tests and Inspection 8.3-49 8.3.2.1.10 Administratively Controlled Devices 8.3-49 8.3.2.2 Analysis 8.3-49 8.3.2.2.1 DC System 8.3-49 8.3.2.2.2 Reliability 8.3-49 8.3.2.2.3 250V DC System 8.3-49

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-iii UFSAR Rev 30 10/2014

TABLE OF CONTENTS (CONTINUED) Section Title Page 8.3.2.2.4 125V DC Control Panel Boards 8.3-49 8.3.2.2.5 Station DC System 8.3-50 8.3.2.2.6 Battery Chargers 8.3-50 8.3.2.2.7 Design Criteria for Cables and Raceways 8.3-50 8.3.2.2.8 Redundancy in DC Control Power 8.3-50 8.3.2.2.9 DELETED 8.3.2.2.10 Quality Assurance Procedure 8.3-50 8.3.2.2.11 Drawings 8.3-50

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-iv UFSAR Rev 30 10/2014

LIST OF TABLES Table Title Page 8.3-1 Emergency Diesel Generator Load Tables 8.3-51 8.3-2 Administratively Controlled Circuits (AC) 8.3-55 8.3-3 Administratively Controlled Circuits (DC) 8.3-56 8.3-4 Environmental Requirements for Class 1E Cable 8.3-57 8.3-5 DELETED

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-v UFSAR Rev 30 10/2014

LIST OF FIGURES Figure Title 8.2-1 DELETED 8.2-2 345kV Switchyard One-line Diagram 8.3-1 AC Electrical System One-Line Diagram, Sheet 1 8.3-2 AC Electrical System One-Line Diagram, Sheet 2 8.3-3 DELETED 8.3-4 4.16 Feeder Breakers Bus C1 Tripping and Lockout and Sychro Check Relays 8.3-5 4.16kV Feeder Breaker Bus Tie XFMR BD Brkr ABDC1 Control 8.3-6 4.16kV Feeder Breaker Bus Tie XFMR Brkr ABDC1 Control 8.3-7 4.16kV Feeder Breaker Buses C1, C2 Tie Brkr AC 110 Control 8.3-8 4.16kV Feeder Breaker Buses C1, C2 Tie Brkr AC 110 Control 8.3-9 4.16kV Feeder Breaker - Bus C1 (D1) Tripping and Lockout Relays & Synchro-Check Relays 8.3-10 4.16kV Feeder Breaker - Bus C1 (D1) Voltage and Aux Relays 8.3-11 4.16kV Feeder Breaker - Essential Unit Substations E1 & F1 Control, Sheet 1 8.3-12 4.16kV Feeder Breaker - Essential Unit Substations E1 & F1 Control, Sheet 2 8.3-13 Auxiliary Building Sections 8.3-14 “E” Buses 480V Unit Substations One-Line Diagram, Sheet 1 8.3-15 “F” Buses 480V Unit Substations One-Line Diagram, Sheet 2 8.3-16 Water Treatment and Turbine Bldg 480V Unit Substations One-line Diagram, Sheet 3

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-vi UFSAR Rev 30 10/2014

LIST OF FIGURES (CONTINUED) Figure Title 8.3-17 480V Unit Substation Lighting Distribution One-Line Diagram, Sheet 4 8.3-18 PZR and Annulus Heaters 480V Unit Substation One-Line Diagram, Sheet 5 8.3-19 Essential Unit Substations E1 and F1 Incoming Feeder Circuit Breakers, Sheet 1 8.3-20 Essential Unit Substations E1 and F1 Incoming Feeder Circuit Breakers, Sheet 2 8.3-21 Essential Unit Substations Incoming Feeder Circuit Breakers, Sheet 3 8.3-22 Essential Unit Substations MCC Feeder Circuit Breakers, Sheet 4 8.3-23 480V AC MCC (Essential) One-Line Diagram, Sheet 1 8.3-24 480V AC MCC (Essential) One-Line Diagram, Sheet 2 8.3-25 250/125V DC and Instrumentation AC One-Line Diagram 8.3-26 DELETED 8.3-27 DELETED 8.3-28 DELETED 8.3-29 DELETED 8.3-30 DELETED 8.3-31 Raceways and Grounding, Containment Details 8.3-32 Raceways, Containment EIev. 4 (603’) 8.3-33 Electrical Penetration Arrangement, Shield Bldg 8.3-34 Electrical Penetration Details 8.3-35 Raceway Cable Spreading Room Fire Barriers 8.3-36 Raceway Cable Spreading Room Fire Barriers

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8-vii UFSAR Rev 30 10/2014

LIST OF FIGURES (CONTINUED) Figure Title 8.3-37 Raceway Cable Spreading Room Fire Barriers 8.3-38 Criteria for Interposing Trays Fire Hazard 8.3-39 Raceway Separation Criteria Fire Hazard (Excludes External Source) 8.3-40 Raceway Separation Criteria Fire Hazard (Excludes External Source) 8.3-41 Raceway Separation Criteria Fire Hazard (Excludes External Source) 8.3-42 Raceway Separation Criteria Fire Hazard (Excludes External Source) 8.3-43 Fire Barrier Details 8.3-44 Fire Barrier Details 8.3-45 Fire Barrier Details 8.3-46 125/250V DC MCC No.1 (Essential) One-Line Diagram, 8.3-47 125/250V DC MCC No.2 (Essential) Single-Line Diagram, 8.3-48 480V AC MCC (Essential) One-Line Diagram

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-1 UFSAR Rev 31 10/2016

SECTION 8

8.0 ELECTRICAL POWER 8.1 INTRODUCTION The electric power systems for Davis-Besse Nuclear Power Station are designed to be electrically self-sufficient and to provide adequate, redundant, and reliable power sources for all electrical equipment for start-up, normal operation, safe shutdown and handling all emergency situations. 8.1.1 Utility Grid The primary Toledo Edison transmission voltage is 345 kV (nominal). Davis-Besse is connected to nearby 345 kV substations at Bay Shore (NW of Davis-Besse), Lemoyne (SW of Davis-Besse), Ohio Edison - Beaver substation (SE of Davis-Besse) and Hayes substation (SE of Davis-Besse). Office building support equipment at Davis-Besse receives some power from local distribution systems, but there are no transmission connections other than the four 345 kV connections described above. Toledo Edison uses other transmission voltages than 345 kV. The most important voltage used, other than 345 kV, is 138 kV (nominal). There are several interconnections to other utilities at 345 kV and 138 kV. Utilities connected to the Toledo Edison grid include Detroit Edison, American Electric Power, and Ohio Edison. Each of the 345 kV substations connected to Davis-Besse is associated with at least one inter-utility connection. 8.1.2 Onsite Systems The onsite electrical systems consist of the 13.8kV, the 4.16kV, and the 480V AC distribution systems, the 120V AC instrumentation and control system, the 250/125V DC systems two 4.16kV emergency diesel-generator units and one non-Class 1E 4.16 kV diesel generator which serves as the alternate AC source for station blackout. The normal source is the unit auxiliary transformer. The reserve power supply and startup sources are the two startup transformers. The standby power supply is provided by the two emergency diesel-generators. All voltages are nominal. 8.1.2.1 Main Generation System The main generator is rated at 1069 MVA at 0.9 power factor, 25kV, 60 Hz. The protection for the main turbine generator consists of generator protection and turbine protection. The generator protection system can be divided into the following categories:

1. abnormal conditions originating in the grid system 2. abnormal conditions originating in the main generation system.

Abnormal conditions originating in the grid system are identified on the generator as:

1. out of step

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-2 UFSAR Rev 31 10/2016

2. under frequency 3. negative phase sequence 4. over current (voltage restraint)

Abnormal conditions originating in the main generation system are identified as: 1. generator low field and loss of field 2. unit auxiliary transformer 11

a. sudden pressure b. primary phase over current c. secondary ground d. differential

3. main transformer 1

a. sudden pressure b. differential

4. generator differential 5. dual volts/hertz (overexcitation) 6. generator reverse power 7. generator field ground (alarm only) 8. generator stator ground

When the unit is in normal operation, with auxiliary power supplied through the unit auxiliary transformer, the occurrence of any one of the above conditions originating in either the grid system or the main generator system will result in isolation of the turbine-generator unit from the 345kV grid system by opening breakers 34560 and 34561. The 13.8kV buses A and B are immediately fast transferred from the unit auxiliary transformer 11 to the startup transformer(s) 01 and/or 02. The specific startup transformer(s) is determined by preselection using the reserve source selector switches. These switches can align either startup transformer to each 13.8kV bus. The immediate fast transfer of the electrical auxiliary system to the startup transformer(s) is performed for trips initiated by both categories of generator protection because all trips initiated by category 1 do not indicate the existence of a grid condition which is incapable of supplying the auxiliary system. While station auxiliaries could operate during some of the category 1 transient, the generator-turbine must be isolated to minimize the possibility of damage. Using the fast transfer scheme to take advantage of a potentially stable grid may reduce the number of challenges to the emergency diesel generators. Should the power system grid be incapable of supporting the

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-3 UFSAR Rev 31 10/2016

station auxiliaries, existing relays will detect that condition and initiate appropriate changes in the station’s electrical line up. The turbine protection system detects abnormal conditions relating to the turbine. The more significant malfunctions or faults which cause turbine trips are listed in section 10.2.3. Any of these abnormal conditions or trips results in a turbine trip which closes the main steam stop valves and the combined intercept valves. With the closure of these valves and any of the breakers 34560, 34561, HX11A, or HX11B closed, the generator anti-motoring circuit becomes functional in combination with a reverse power relay. The output of the anti-motoring circuit in series with the output of the reverse power relay operates a relay which trips breaker(s) 34560, 34561, HX11A, and HX11B. Under normal operation with breakers 34560 and/or 34561 closed and breakers HX11A and HX11B closed, a turbine trip results in a delayed transfer of the 13.8kV buses A and B from the unit auxiliary source to the preselected startup transformer(s). The actual transfer is a fast transfer, but the transfer initiation is delayed by the generator protective relaying. In addition to protecting the main turbine generator and the turbine, a turbine trip, if it occurs above a certain reactor power setpoint, will initiate the Anticipatory Reactor Trip System (ARTS) which trips the reactor. This system is also actuated by the trip of both main feedwater pump turbines or an SFRCS trip. 8.1.3 Essential Functions The station essential functions are:

1. Emergency Core Cooling 2. Containment Cooling 3. Containment Isolation 4. Emergency Ventilation 5. Safe Shutdown 6. Containment Vessel Combustible Gas Control

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-4 UFSAR Rev 31 10/2016

8.1.4 Essential Loads The station essential loads, related essential functions, and type of electric power supply to each load are:

Load

Related Essential Function (refer to Section 8.1.3) Power Supply

High pressure injection pumps (1) 4.16kV AC Decay heat removal pumps (1) 4.16kV AC Component cooling pumps (1)(2)(5) 4.16kV AC Service water pumps (1)(2)(5) 4.16kV AC Containment spray pumps (2) 480V AC Containment air cooler fans (2) 480V AC Containment vessel hydrogen dilution blowers

(6) 480V AC

Hydrogen recombiner (6) 480V AC Containment vessel isolation valves (3) 480V AC Emergency ventilation fans (4) 480V AC Control room emergency ventilation fans (4) 480V AC Emergency diesel generator auxiliaries (1)(2)(3)(4)(5)(6) 480V AC Engineered safety feature valves (1)(2)(3)(5) 480V AC and 125V DC Auxiliary feed pump controls (5) 125V DC Safety features actuation system (1)(2)(3)(4) 120V AC Reactor protection system (5) 120V AC Main steam atmospheric vent valves (5) 125V DC 8.1.5 Design Bases The electrical systems are designed to ensure that no single component failure will prevent operation of engineered safety systems. Redundant power sources are provided to ensure continuous operation of equipment under all modes of operation. Testing of systems is possible with the station in operation. Electrical and physical separation of cables and equipment associated with redundant elements is provided.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-5 UFSAR Rev 31 10/2016

The design documents that are implemented in the design of the electrical systems are listed below: Document No. Title Approval Date

1. AEC Safety

Guide 6 Independence Between Redundant Standby (Onsite) Power Sources and Between Their Distribution Systems

3-10-71

Safety

Guide 9 Selection of Diesel Generator Set Capacity for Standby Power Supplies

3-10-71

Safety

Guide 22 Periodic Testing of Protection System Actuation Functions

2-17-72

Safety Guide 30

Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment

8-11-72

Safety

Guide 32 Use of IEEE Standard 308-1971 “Criteria for Class 1E Electric System for Nuclear Power Generating Stations”

8-11-72

10CFR50,

Appendix A General Design Criteria for Nuclear Appendix Power Plants (as applicable)

2-10-71

2. IEEE 308 Criteria for Class 1E Electric Systems for Nuclear Power

Generating Stations 9-16-71

317 Electrical Penetration Assemblies In Containment

Structures For Nuclear Fueled Power Generating Stations

2-4-71

323 General Guide for Qualifying Class 1E Electric

Equipment for Nuclear Power Generating Stations 2-4-71

334 Type Tests of Continuous-Duty Class 1E Motors

Installed Inside the Containment of Nuclear Power Generating Stations

9-16-71

336 Installation, Inspection, and Testing Requirements for

Instrumentation and Electric Equipment During the Construction of Nuclear Power Generating Stations

9-16-71

344 Seismic Qualification of Class 1E Electric Equipment for

Nuclear Generating Stations 9-16-71

387 Criteria for Diesel-Generator Units Applied as Standby

Power Supplies for Nuclear Power Generating Stations 12-2-71

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.1-6 UFSAR Rev 31 10/2016

3. In addition to the above, the relevant ANSI, IPCEA and NEC recommendations are used as guides in the design.

4. An ongoing program for environmental qualification is being implemented by DBNPS to

qualify Class 1E equipment to the requirements of 10CFR50.49. 5. The design basis for the Emergency Diesel Generator excitation system also includes the

following standards or regulatory documents used to qualify the replacement system. The first two guidelines below apply only to the RA70 Microprocessor-based Reference Unit.

EPRI TR-102348, Revision 1

Guideline on Licensing Digital Upgrades: TR-102348, Revision 1, NEI 01-01: A Revision of EPRI TR-102348 to Reflect Changes to the 10CFR50.59 Rule.

Endorsed by NRC Regulatory Issue Summary 2002-22

EPRI TR-106439

Guideline on Evaluation and Acceptance of Commercial Grade Digital Equipment for Nuclear Safety Applications, October 1996.

Accepted by NRC SER March 1997

EPRI TR-102323, Revision 2

Guidelines for Electromagnetic Interference Testing of Power Plant Equipment

Issued November 2000

During the design phase of Davis-Besse Unit 1, complete adherence to the (February 1974) Regulatory Guide 1.75 “Physical Independence of Electric Systems” was not possible since plant design pre-dated the issuance of 1.75 as well as IEEE 384-1974. However, the independence principles followed in the design are considered adequate to preclude a common failure mode for any design basis event and do, in fact, represent partial conformance. IEEE 279 and IEEE 308, both 1971, were used as guides during the design phase of the plant with the exception, noted in Chapter 7. Separation between redundant Class 1E equipment and circuits is mainly by separate safety class structures (rooms). However, distance and barriers are utilized as acceptable alternates. Further, there is compatibility of mechanical and electrical system design which provides that failure of related mechanical equipment of one redundant system cannot disable Class 1E circuits and equipment essential to the operation of the other redundant system. The routing of non-Class 1E cables is discussed in Subsection 8.3.1.2.18.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.2-1 UFSAR Rev 31 10/2016

8.2 OFFSITE POWER SYSTEM 8.2.1 Description Station output generated at 25kV, is fed through an isolated phase bus to the 980 MVA main transformer where it is stepped up to 345kV transmission voltage and delivered to the station switchyard. The 345kV switchyard includes one line to Bayshore Substation, one line to Lemoyne Substation, one line to Beaver Substation (Ohio Edison), and one line to Hayes Substation. Three overhead 345kV lines are provided from the switchyard to the onsite station distribution system, one line to each of the two startup transformers and a third line to the main transformer (see Figure 8.2-2). One or both of the two 345kV overhead lines to the startup transformers will be available to supply all essential loads within a few seconds of a loss-of-coolant accident. The third overhead line to the main and auxiliary transformers can be made available to supply all essential loads following a loss of all onsite alternating current power supplies by removing the generator main leads disconnecting links and changing the auxiliary transformer tap. The third overhead line to the main and auxiliary transformers may be utilized in place of a startup transformer to supply all essential loads within a few seconds of a loss-of-coolant-accident provided the unit auxiliary transformer is aligned to the 13.8kV bus(es) and the generator main leads disconnecting links are removed. 8.2.1.1 Reliability Considerations The possibility of power failure due to faults in the network interconnections and the associated switching is minimized by the following arrangements:

a. Any one of the four 345kV transmission lines may be interrupted, and the others

will be capable of carrying the load. b. There are no offsite transmission line crossovers which would jeopardize

availability of offsite power. c. There are no transmission line crossovers onsite which would jeopardize the

availability of offsite power. The 345 kV transmission tie lines between the switchyard and startup transformers No. 01 and 02 originate at separate positions in the switchyard and are routed on separate structures, adequately separated to minimize the possibility of their simultaneous failure.

d. There are no known offsite structures such as microwave towers or sources of fire,

explosion or missiles, which, if postulated to fail in the worst possible manner, could result in damage which precludes meeting the requirements of General Design Criterion 17.

There are no onsite structures such as microwave towers which, if failed, would result in the loss of both sources of offsite power. The microwave tower is located in the southwest corner of the site, remote from the switchyard and transmission lines.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.2-2 UFSAR Rev 31 10/2016

The only source of fire, explosion, or missiles in the switchyard that if postulated to fail in the worst possible manner could result in not meeting the requirements of Criterion 17 are the two switchyard a-c station service transformers and the 345 kV power circuit breakers.

The two a-c station service transformers are separated by a masonry firewall and are located remote from any essential switchyard equipment.

The 345 kV power circuit breakers are adequately separated (minimum 100 feet) to minimize the possibility of missile damage to equipment in separate positions in the event of a breaker blowup.

e. Two of the 345kV transmission lines are constructed on the same right of-way for a

part of their length (about 2 ½ miles), but the lines are supported on independent structures set far enough apart to avoid the possibility of structural collapse of one causing an outage of both lines.

f. The 345kV system is protected from lightning and switching surges by lightning

protection equipment and by overhead grounded shield wires. g. The 345kV system stability will be maintained on the loss of the generator. h. The bus switching arrangement in the 345kV switchyard includes two full capacity

main buses. Primary and backup relaying (redundant systems) are provided for each circuit along with circuit breaker failure backup protection. These provisions permit the following:

1. Any transmission line can be cleared under normal or fault conditions without

affecting any other transmission line. 2. Any single circuit breaker can be isolated for maintenance without interrupting

the power or protection to any circuit. 3. Short circuits on a section of bus will be isolated without interrupting service to

any circuit, other than that connected to the faulted bus section. 4. Short circuit failure of power circuit breaker No. 34562 will result in the loss of

the startup transformer No. 02 and the Bay Shore line until the point of the fault is isolated by disconnect switches.

5. Short circuit failure of power circuit breaker No. 34561 will result in the loss of

the main unit and the Bay Shore line, until the point of fault is isolated by disconnect switches.

6. Short circuit failure of power circuit breaker No. 34564 will result in the loss of

the Ohio Edison tieline and the Lemoyne line, until the point of fault is isolated by disconnect switches.

7. Short circuit failure of power circuit breaker No. 34560 will result in tripping the

generator main breakers, the loss of the unit from the system and of startup transformer No. 01, until the point of fault is isolated by disconnect switches.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.2-3 UFSAR Rev 31 10/2016

8. Short circuit failure of power circuit breaker No. 34563 will result in the loss of the startup transformer No. 01 and the Lemoyne line until the point of fault is isolated by disconnect switches.

9. Short circuit failure of power circuit breaker No. 81-B-67 will result in the loss

of startup transformer No. 02 and the Hayes line until the point of fault is isolated by disconnect switches.

10. Short circuit failure of power circuit breaker No. 81-B-66 will result in the loss

of startup transformer No. 01 and the Hayes line until the point of fault is isolated by disconnect switches.

11. Short circuit failure of power circuit breaker No. 81-B-65 will result in the loss

of startup transformer No. 02 and the Ohio Edison (Beaver) line until the point of fault is isolated by disconnect switches.

Providing all switchyard circuits, breakers, and transformers are in service, there are no known aspects of the Davis-Besse design that do not meet the requirement of General Design Criterion (GDC) 17. A single switchyard circuit or breaker(s) can be removed from service and the remaining circuits, breakers, and transformers will still meet the requirements of GDC 17. 8.2.1.2 Stability Analysis Completed system studies have shown that the system meets Criterion 17. The results show that losing station output will not adversely affect the capability of providing offsite power to the essential buses. These analyses are reviewed and revised as needed following significant long-term changes in the transmission or loading characteristics of the FirstEnergy grid, or when a system operating event otherwise demonstrates a need for analysis update. These analyses are generally performed by offsite personnel responsible for system planning or transmission system design. The results of the most recent analyses are summarized below: A steady state analysis simulated anticipated summer loads with normal system conditions, single element outages, and multiple element outages. There were no thermal or voltage criteria issues identified at the Davis-Besse Nuclear Power Station. A voltage stability analysis modeled anticipated load, system reinforcements, and topology for summer operating conditions. The analysis evaluated a single generator and one line out of service and evaluated two lines and one generator out of service. For all of the applied FirstEnergy Planning outage contingencies to the voltage stability analysis, there were no voltage stability issues identified with the Davis-Besse Nuclear Power Station. Transient stability studies performed by PJM (Pennsylvania-New Jersey-Maryland Interconnection) evaluated a number of contingencies and determined that all faults were stable and that the Davis-Besse Power Station had acceptable damping. The evaluated contingencies include:

1. Loss of the main generating unit. 2. Three phase fault on each transmission line. 3. Stuck breaker conditions for clearing single phase fault on each transmission line.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.2-4 UFSAR Rev 31 10/2016

4. Back-up relay breaker clearing for three phase fault at remote terminal of each transmission line.

8.2.1.3 Switchyard DC System The design of the 125V DC system for the switchyard consists of two independent systems. A fused safety switch permits these two systems to be connected during periods of battery/battery charger maintenance and testing. This fused safety switch will normally be locked open to maintain system independence. Each consists of one 125V DC, 290 amp-hour battery (nominal), one battery charger, and one 125V DC 400 ampere distribution panel. Cable separation is maintained between the two systems. There are two batteries for the control and protective relay functions of the 345kV switchyard and transmission lines. The two batteries are located on opposite walls in the switchyard relay house basement. Each battery is supplied by a separate battery charger, each charger is supplied from a separate and independent AC station service distribution panel. In the event of the loss of one battery, the other battery has sufficient capacity to supply all the DC circuits required to detect and clear a single fault including faults requiring initiation of breaker failure protection. The DC circuits associated with each battery are routed in physically separate raceway systems. DC circuits for transmission line protective relays, J and K Bus differential relays, and 345kV breaker trip coils are completely redundant. The AC supplies to each battery charger are also physically separated. 8.2.1.4 Switchyard Systems During normal operation, a single failure caused by a malfunction of either of the two switchyard DC systems will not affect the fault detection and fault clearing capabilities of the other system. The ability of the switchyard to supply offsite power to the station will not be affected by the loss of the two 125V DC systems because a loss of DC power will not cause equipment to change state.

FROM UNIIT NO. I

MAIN TRANSF. NO. 1

\

( TO BAYSHORE SUBSTATION

TO START-UP TRANSF. N0.01

\ "J" CEASTI BUS

34560

34561

34562

"K" IWESTl BUS

( TO LEMOYNE SUBSTATION

TO START-UP TRANSF. N0.02

\

34563 81-B-66

34564 81-B-67

81-B-65

( TO OHIO

EDISON CO. TO HAYES

SUBSTATION

DAVIS-BESSE NUCLEAR POWER STATION 345 KV SWITCHYARD ONE-LINE DIAGRAM

FIGURE 8.2-2 REVISION 30

OCTOBER 2014 OB 07-18-14 OFN: G/USAR/UFIG822.0GN

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-1 UFSAR Rev 32 9/2018

8.3 ONSITE POWER SYSTEMS 8.3.1 AC Power System 8.3.1.1 Description The station distribution system consists of various auxiliary electrical systems designed to provide reliable electrical power during all modes of station operation and shutdown conditions (see Figures 8.3-1 and 8.3-2). The systems are designed with sufficient power sources, redundant buses and required switching, to ensure reliability. Engineered safety feature circuits are arranged so that a loss of a single bus section, for any reason, results in only single losses of auxiliaries leaving redundant auxiliaries to perform the same function. The station distribution system is capable of starting and accelerating the largest required drive with the remainder of the connected motor loads in service. The system will have a fast transfer to the reserve power source following a turbine generator or reactor trip, without the loss of auxiliary load. Protective relaying is arranged for selective tripping of circuit breakers or fused disconnect switches, thus limiting the loss of power to the affected area. Separate analyses were performed assuming the power sources from the offsite network to the safety reIated buses as derived from (1) unit auxiliary transformer and (2) the startup transformer(s). For each case it was assumed that the need for electric power was initiated by an anticipated transient such as a unit trip or an accident, whichever presented the largest load demand. Manual load shedding was not assumed. The computer model developed to perform the analyses incorporated preliminary load data collected at the plant with the unit operating at 100 percent of the electrical output power. In addition, the computer model used actual test data for the installed equipment. The plant’s existing electrical auxiliary system configuration (e.g., breaker status, transformer taps, etc.) was included in the computer model. Additional calculations were performed to analyze the transients caused by starting either a reactor coolant pump or condensate pump under full load conditions plus with all Class 1E loads already running. This was performed for different onsite distribution conditions and the bus voltages were determined for each case. The analyses show that the transient voltage dips caused by starting a reactor coolant pump or condensate pump do not fall below the voltage values needed by the Class 1E equipment to traverse the transient. Class 1E equipment is not required to actuate during the transient since all Class 1E loads are running in these cases. Calculations were also done to determine the voltages on safety-related buses from a SFAS start which confirm that the equipment would be operating within their capabilities to perform their functions. In conclusion the analyses have demonstrated that adequate voltage will exist on the safety-related buses so that the safety systems can perform their functions. The analyses have included contingency cases which further support the capabilities of the plant’s electrical auxiliary system. The analyses have included comparison of the safety-related equipment capabilities to continuous operating conditions, transient conditions and actuation conditions. The steady-state analysis shows that the voltage on the Class 1E 4160V bus does not drop below the degraded voltage relay setting during the worst operating conditions of full auxiliary load and full Class 1E load.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-2 UFSAR Rev 32 9/2018

8.3.1.1.1 Unit Auxiliary and Startup Transformers During normal operation of the station, the 52/69 MVA unit auxiliary power transformer, connected to the generator isolated phase bus, provides the normal source of electrical power for station auxiliaries. Two startup transformers, each 39/52/65 MVA, are supplied from different 345kV switchyard bus sections. Each startup transformer provides power for startup, shutdown, and post-shutdown requirements. The two transformers will also serve as a complete reserve power source for the station auxiliaries in the event of failure of the unit auxiliary transformer supply. The impact of open phase conditions on the capability of the startup transformers to perform their functions was evaluated. The conditions analyzed consisted of single (one of three) and double (two of three) open phase conductors on the high voltage (345 kV) side of the startup transformers. The analysis considered open phase conditions with and without a ground. Open phase detection and isolation systems for the startup transformers were installed to ensure that plant structures, systems, and components important to safety can perform their intended functions under postulated open phase conditions. Upon detection of an open phase condition, the system will isolate the affected startup transformer and provide operator indication of the open phase condition. After initial installation, the OPPS will be operated with the automatic isolation function of the OPPS disabled for initial monitoring period, which is expected to last up to one operating fuel cycle. The monitoring period will used to confirm that the system performance and associated setpoints provide the correct level of protection. During Operational Mode 3, 4, 5, 6, or defueled, the circuit connecting the 345 kV switchyard to the 13.8 kV buses through the main transformer and the auxiliary transformer may be utilized in place of a startup transformer, provided the generator main leads disconnecting links are removed and the auxiliary transformer tap is changed. Additional restrictions apply to bus configuration when the backfeed alignment is in use. Refer to the Technical Specification bases for more information. Normally each startup transformer is the reserve power source of only one 13.8kV bus. However, if either transformer is out of service, the remaining startup transformer is available (by manual pre-selection) to automatically supply both 13.8kV buses should the normal source (auxiliary transformer) fail. Note that in MODES 1, 2, 3 and 4, a single startup transformer and a single bus tie transformer, supplying the loads normally served by two startup transformers and two bus tie transformers, can not be guaranteed to provide adequate voltage to all equipment required for safe shutdown following a LOCA. The secondaries of all three transformers are of low-resistance grounded, wye-connected construction. 8.3.1.1.2 13800 Volt Auxiliary System During normal operation each 13.8kV bus is fed from one of the 13.8kV secondary windings of the unit auxiliary transformer. During startup and shutdown, each bus is fed from the 13.8kV secondary winding of either startup transformer No. 01 or No. 02, or, during operational Mode 3, 4, 5, 6, or defueled, backfed through the main power transformer and unit auxiliary transformer with the generator links removed and the auxiliary transformer tap is changed.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-3 UFSAR Rev 32 9/2018

The unit 13.8kV auxiliary distribution system consists of two 2000 A buses: A and B (see Figure 8.3-1). Each bus supplies the following loads:

two 9000 HP Reactor Coolant Pumps two 4500 HP Circulating Water Pumps one 12/16 MVA Bus Tie Transformer six 1000/1150kVA Nonessential Unit Substation Transformers

The transfer of a 13.8kV bus between the three sources of electrical power can be either manual or automatic. Manual transfer is initiated by the operator from either the control room or the switchgear room, and automatic transfer is initiated by the action of generator or transformer protective relays. Reserve source selector switches are provided to preselect the alignment of startup transformers for buses A and B. This pre-selection of the alignment is for the fast bus transfers. When power is being supplied to a 13.8kV bus by a startup transformer, the reserve source selector switch for that bus can preselect the alternate startup transformer source. This permits a fast bus transfer to the alternate startup transformer source should the original source fail. The control circuits of the feeders will not allow multiple power sources to be connected to either bus A or bus B except for a momentary paralleling of sources by manual transfer on station startup or shutdown. Manual bus transfer between the sources is a live bus transfer scheme allowing the incoming source feeder circuit breaker to first close onto the energized bus, and then its interlocks cause the outgoing source feeder circuit breaker to trip when the operator releases the control switch of the incoming breaker. This transfer scheme results in no power interruption to the bus. The live transfer is supervised by a synchro-check relay permitting the completion of the transfer only if the two sources are in phase. Manual transfer is provided between any of the three power sources as preselected by the operator. The fast bus transfer scheme from the unit auxiliary transformer 11 to the startup transformers 01 and/or 02 is further enhanced by fast acting synchrocheck relays. Opening of the 345kV breakers 34560 and 34561 during normal power operation with the electrical auxiliary systems being supplied power from the unit auxiliary transformer 11 will result in these relays monitoring the phase angle difference between the secondary voltage of the unit auxiliary transformer 11 and the startup transformer(s) secondary voltage during the fast bus transfer. Should the angle exceed 35 degrees the transfer will be blocked to prevent out of phase re-energization and the associated over-voltage stresses on the plant’s electrical auxiliary system. These fast acting synchrocheck relays are also functional during the generator protective relaying delayed transfer scheme. Automatic fast transfer of a 13.8kV bus from the unit auxiliary transformer to an available startup transformer is initiated by either generator protective relays or transformer protective relays. Transfer is made to the startup transformer which has been preselected as the reserve power source for the given 13.8kV bus by means of a selector switch in the control room or switchgear room. Automatic transfer occurs only from the normal to the reserve sources or between the two reserve power sources; the transfer from either of the startup transformers to the unit auxiliary transformer can only be done manually. A startup transformer is available as a reserve source to a bus if:

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-4 UFSAR Rev 32 9/2018

a. Its secondary voltage is normal. b. Its protective lockout relay is not tripped. c. The bus feeder breaker closing DC voltage is available.

8.3.1.1.3 4160 Volt Auxiliary System Power supply to the 4160 volt system is from two 12/16 MVA bus tie transformers which step down the voltage from 13800 volts to 4160 volts. Each bus tie transformer normally supplies one essential and one nonessential 4160 volt bus and is available as a reserve source for the other two 4160 volt buses. The capacities of the transformers and circuit breakers are sufficient to permit full station operation with one bus tie transformer out of service, providing both startup transformers are available. (Analysis has shown that the impedances of the bus tie and startup transformers are such that acceptable voltage levels can not be guaranteed for all accident scenarios with the entire station load being simultaneously supplied through a single bus tie transformer and a single startup transformer.) Each essential 4160 volt bus is provided with a fast bus transfer scheme that will transfer the bus from its normal source to an alternate source of power. The 4160V auxiliary distribution system consists of five 4160V, 2000 amp buses (see Figure 8.3-1). When the unit is off line with nominal loading on the buses, the startup transformer taps may be changed to maintain voltage within an acceptable range. When the unit is brought back on line, the two startup transformers’ taps are reset for unit power operation. When the unit is offline with nominal loading on the buses, the unit auxiliary transformer can be made available to supply loads by removing the generator main leads disconnecting links and changing the unit auxiliary transformer taps to maintain voltage within an acceptable range. Two essential buses C1 and D1 provide power to engineered safety feature equipment for safe station shutdown. Each of the essential 4160V buses supplies the following loads:

Quantity Motor HP

(Nameplate) 1 Service Water Pump 600 1 High Pressure Injection Pump 600 1 Decay Heat Pump 400 1 Component Cooling Pump 400 1 Essential 4160-480V Unit Substation Transformer 1000kVA

Also, each bus supplies power to one 450 HP makeup pump motor. In addition, a third 600 HP service water pump and a third 400 HP component cooling pump are provided. Each of these two pumps is connected to two 4.16kV Kirk Key interlocked, manually controlled transfer switching breakers. The Kirk Key interlock permits only one breaker to be closed at a time. Each breaker of a motor pair is connected to a separate essential 4.16kV bus. Further interlocks are provided to prevent more than one component cooling pump breaker and one service water pump breaker from automatically closing and connecting to either emergency diesel generator at the same time. It should be noted that while swapping the running and

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-5 UFSAR Rev 32 9/2018

spare Component Cooling pumps, both pumps are temporarily running on the same bus, and would remain on the bus if the emergency diesel generator was started. Administrative controls will alert operators to this unconventional EDG loading and to minimize the time during which two CCW pumps are connected onto one bus. Also, the sequences of aligning the pumps’ 4KV breakers are administratively controlled to ensure a pump is available for auto-loading onto each essential bus. The two 4.16kV nonessential buses C2 and D2 supply power to non-safety-related station auxiliaries indicated on Figures 8.3-1 and 8.3-2. In the event of a station blackout, bus D2 can be aligned to either essential 4.16 kV bus for the purpose of using the Station Blackout Diesel Generator (SBODG) to supply loads required for coping with a loss of all AC power. In normal operation, the secondary winding of each bus tie transformer is connected through a 2000 amp circuit breaker to its associated nonessential 4.16kV bus. This bus then feeds the corresponding essential 4.16kV bus through a 1200 amp circuit breaker. Each essential bus can also be energized directly from the other bus tie transformer. Transfer schemes are provided to switch each 4.16kV bus from its normal bus tie transformer to its reserve. The transfer between the two sources is done either manually, initiated by the operator at the control room, or automatically initiated by a protective relay action. Manual transfer is a live bus scheme while automatic transfer is a fast one. The 4.16kV system is low resistance grounded. The grounding point is the neutral of each source transformer. The attached schematic diagrams (see Figures 8.3-5 through 8.3-12) are provided to permit an evaluation of compliance with the safety criteria. Each 4.16kV safety-related bus is provided with two levels of voltage protection. Four relays at each level function as a coincidental logic to preclude spurious trips of the offsite power source. The time delays associated with the relays are chosen so as to minimize the effect of short duration disturbances from reducing the availability of the offsite power source, to assure that the allowable time duration of a degraded voltage condition does not result in failure of safety systems or components, and to assure the starting times of equipment assumed in the accident analysis are not exceeded. The Degraded Voltage Relays automatically initiate disconnection of the offsite power source whenever the voltage setpoint and time delay have been exceeded. The Loss of Voltage Relays automatically initiates disconnection of the offsite power source, load shed the bus, and starts the diesel generator whenever the voltage setpoint and time delay have been exceeded. See Technical Specification and Technical Requirements Manual for voltage and time delay values. Starting one reactor coolant pump or circulating water pump can result in a voltage reduction on the 4.16 KV buses because the voltage drop on the 13.8 KV buses which supply power to the pump motors is fed through to the 4.16 KV buses. In order to block the low voltage trip when these pumps are started, a push button bypass allows the degraded voltage relays to be bypassed for up to one minute during pump starts.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-6 UFSAR Rev 32 9/2018

8.3.1.1.4 Diesel Generators General Description: 8.3.1.1.4.1 Emergency Diesel Generators Two redundant emergency diesel generator units, one connected to essential 4.16kV bus C1 and the other connected to essential 4.16kV bus D1, are provided as onsite standby power sources to supply their respective essential buses upon loss of the normal and the reserve power sources. Bus load shedding and isolation, bus transfer to the emergency diesel generator, and pickup of critical loads is automatic. Each emergency diesel generator has the following ratings and characteristics:

Continuous rating 2600 kW #2000 hr. rating 2838 kW 200 hr. rating 2946 kW #30 minute rating 3035 kW *Short term rating 2860 kW Generator rating 3250 kVA Assumed power factor 0.8

* Short-term rating is the electric power output capability that the emergency diesel generator can maintain in the service environment for two hours in any 24-hour period. # Any combination of normally connected (and operating) loads and loads that are automatically connected (and operating) following a loss of offsite power and/or LOCA will not exceed the smaller of the 2000 hour rating or 90 percent of the 30-minute rating (i.e., 3035* 0.9 = 2731.5 kW) of the emergency diesel generator, after taking into account actual expected loading (vs. rated load). Refer to Table 8.3-1 for the applicable load tabulations. (Reference Safety Guide 9, Regulatory Position C.2) The emergency diesel generator is capable of attaining rated frequency and voltage approximately 10 seconds after the engine start signal is received. Each of the two emergency diesel generators has the capability to:

a. Supply continuously the sum of the load on the essential 4160V bus needed to be

powered at any one time. b. Start and accelerate to rated speed in the required sequence its dedicated

engineered safety features loads. At no time during the loading sequence, will the frequency and voltage decrease to less than 95 percent of nominal and 75 percent of nominal, respectively, except that during the first step in the required loading sequence, there may be a voltage dip below 75 percent of normal lasting for a few cycles due to the essential unit substation transformer excitation inrush.

During recovery from transients caused by step load increases or resulting from disconnection of largest load, the speed of the diesel engine will not exceed 75 percent of the difference between nominal speed (900 rpm) and the overspeed trip setpoint. Each diesel will receive a starting signal when any one of the following occurs:

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-7 UFSAR Rev 32 9/2018

a. Loss of essential bus voltage b. A safety feature actuation signal (SFAS level 2) c. Manual start (local or remote) d. Test signals to simulate any of the above

Any of the above conditions will initiate a start signal to the emergency diesel engine. However, except for manual synchronizing during routine testing, the essential bus will be isolated only upon loss of voltage or a bus fault, and the emergency diesel breaker will be closed only on loss of voltage without a bus fault. Relays connected to potential transformers at the emergency diesel generator terminals will detect generator rated voltage and provide a permissive interlock for the closing of the respective generator circuit breaker. Interlocks are provided to prevent automatic closing of an emergency diesel generator breaker to an energized or faulted bus. Emergency Operation: Loss of essential bus voltage will be detected by the Loss of Voltage Relays. In addition, the Degraded Voltage Relays will permit continuous operation at reduced voltage conditions for a period of time not exceeding the time delay specified in Technical Specifications and the Technical Requirements Manual, after which the incoming 4.16kV essential bus source breakers will be tripped. If loss of power is confirmed, by loss of voltage at either essential 4.16kV bus, the following will occur:

1. All bus load breakers, except the breakers supplying power to the 480V essential

unit substation supply breakers and component cooling pump breakers, will be tripped.

2. Both source breakers will be tripped and the bus will be isolated.

3. The associated emergency diesel generator set will be started, if not already

running. 4. When the emergency diesel generator reaches rated voltage, the corresponding

emergency diesel generator breaker will close energizing the 4.16kV and 480V essential buses.

5a. In case the safety features actuation system has been tripped, the engineered

safety features loads will be automatically energized according to the predetermined loading sequence given in Table 8.3-1.

5b. In case the safety features actuation system has not been tripped, the emergency

diesel will be loaded manually; except that in any case, the component cooling water pumps, service water pumps, previously running makeup pump and the essential 480 volt buses will be started/energized. The loading sequence is provided in the Notes of Table 8.3-1. Also see Section 9.2.7.3 for details.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-8 UFSAR Rev 32 9/2018

In the event of loss of power, there will be an interruption of approximately 10 seconds in power supply to the previously running component cooling pumps. The standby component cooling pump will start 10 seconds after the EDG output breaker closes. However, there will be no effect on the diesel generator performance since each diesel is capable of operating without cooling water for three minutes at startup and for one minute at rated full load. The diesel generators will remain on-line during this interval since the engine high temperature (high jacket water) trip of each diesel is defeated during emergency operation. Testing: The emergency diesel generator units have been tested according to IEEE 387. Periodic testing requirements of the emergency diesel generators are given in the Technical Specifications. Each emergency diesel generator is equipped for test purposes only with means for periodically testing, synchronizing, and loading without interrupting service. Only one emergency diesel generator is loaded at any one time. During testing, interlocks will prevent paralleling an emergency diesel generator with the auxiliary or startup transformer until the generator has been manually synchronized by the operator and the synchronism-check relay contacts are closed. Also for testing purposes, an idle start/stop feature in the diesel generator control circuit allows the diesels to be started to an idle setting via the local idle start circuit and allows for a normal stop 10-minute idle cooldown. A normal or emergency start signal overrides this feature, with exception of the start pushbutton on C3621 (C3622). The idle start/stop feature is intended to prolong the life and reliability of the diesel generators. Mechanical/Electrical Protection: Each emergency diesel generator is equipped with mechanical and electrical interlocks to ensure personnel protection and to prevent or limit equipment damage. During a non-emergency diesel generator operation (for example, on-line testing) some of the following mechanical and electrical protective devices are capable of initiating a diesel generator trip. However, during an emergency operation, namely on a loss of essential bus voltage or an SFAS level 2, controls limit the diesel generator trip to generator differential relay action (87/DG), and engine overspeed (OTS). This measure is taken to minimize the possibility of the above devices needlessly preventing the diesel from operating when required, as during a DBA. However, alarms are still provided for high crankcase pressure, low lube oil pressure, high engine temperature, and electrical protective relays. The 51V-2 relay is also not bypassed which will trip the EDG output breaker due to fault on the essential bus. This relay enhances the availability of the diesel generator.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-9 UFSAR Rev 32 9/2018

Except as modified by a loss of essential bus voltage signal or SFAS level 2, the installed protective type devices that are incorporated in the design to protect the diesel generators from exceeding operating limits are as follows:

A. Electrical Protective Relays: Description Function Reverse power relay (32/DG): - provides anti-motoring protection for the diesel to preclude

the danger of explosion and fire from unburned fuel.

Trip breaker

Generator ground relay (51G/DG): - provides protection for ground faults in the generator, the

4.16kV essential bus, and the cabling between the generator and the bus. It also provides ground-fault back-up protection for feeder faults.

Trip breaker

Generator differential relays (87/DG): - provide protection for faults in the zone between the

generator neutral and its associated 4.16kV essential bus.

Trips engine/breaker

Voltage controlled, over current relays (51V-1/DG,51V-2/DG): - provide generator fault backup protection as well as system

fault backup protection.

Trip breaker

Loss of field relay (40/DG): - provides generator protection due to loss of field.

Trip breaker

Negative phase sequence relay (461DG): - provides generator rotor overheating protection due to

unbalanced faults.

Trip breaker

Over and under-voltage (27-59/DG): - alarms if generator voltage exceeds limits.

Alarm only

Voltage balance (60/DG): - senses an imbalance between the bus potential transformers

and the emergency diesel generator potential transformers due to a blown fuse.

Prevent false trip by emergency diesel generator voltage controlled, over- current relays

Synchronism-check relay (25/DG): - provides generator protection from being manually loaded

onto a 4160V bus out of phase.

Manual breaker permissive

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-10 UFSAR Rev 32 9/2018

B. Mechanical Protective Devices: (Nominal Setpoints - for variances on these setpoints, see the Instrument Index Drawing M-720I) Description Function High Jacket Water Temperature Switch (HJWTS) set at 205°F Trips engine/breaker High Crankcase Pressure Switch (CPS) - set at 1” of water Alarm only Low Lube Oil Pressure Switch (LOPS) - set at 20 psi Trips engine/breaker Engine Overspeed Trip (OTS) - set at 1035 rpm 115% speed Trips engine/breaker Manual Emergency Shutdown: Trips engine/breaker - A manual emergency shutdown pushbutton which does not

get by-passed during emergency operation is located locally at the engine control panel. This device is provided for personnel and equipment protection.

Essential Subsystems: The following are descriptions of the essential subsystems for the diesels:

a. Starting air system - each of the two emergency diesel generators has a complete

starting air supply system including starting air compressor, two air reservoirs (each of which has the capacity to provide 5 starts without recharging), and two sets of two starting motors in parallel, one set from each reservoir. The compressor has sufficient capacity to recharge two air reservoirs from minimum to maximum starting air pressure in not more than 30 minutes. Each air compressor will charge one of the two air reservoirs in the starting systems for each of the two emergency diesel engines. A third compressor, which can be manually aligned to act as either of the normally aligned compressors, is available when either of the other two compressors has been isolated. (Figure 9.5-8A - Diesel Generator Air Start System, and Figure 9.5-10 - Diesel Generator Day Tank Location)

b. Lubricating oil system - each diesel engine has its own independent lube oil system

which is an integral part of the engine. The lube oil system consists of the following (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems):

1. Lube oil filtering and cooling system - this system draws oil from the engine

sump through a cleanable basket strainer by means of an engine-driven scavenge pump. The oil is directed to a full flow filter, and then to an oil cooler. Thermostatically controlled engine jacket water cools and maintains the lube oil temperature automatically at the proper operating condition. The cooled oil returns to an engine-mounted strainer.

2. Main lubrication and piston cooling systems - these systems draw oil from the

oil cooler through the duplex strainer by the gear-driven pressure pump. The main lubrication oil system supplies oil pressure to all necessary moving parts of the engine. The piston cooling pump discharges oil in continuous sprays on the underside of the piston crown. All oil from these systems drains into the engine oil sump. A dipstick oil level gauge is provided, and the oil is added at the strainer.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-11 UFSAR Rev 32 9/2018

3. Turbocharger cooling system - an independent, essentially powered, AC

motor-driven turbo oil pump draws oil from the sump and delivers it to the turbocharger bearings through a replaceable cartridge filter. This pump is always kept running to provide pre-lubrication of the turbocharger bearings for starting and post-lubrication at stopping. The oil drains from the turbocharger housing into the oil sump. An alarm is actuated if sufficient oil pressure is not provided to the turbocharger bearings. An electric, DC motor-driven pump acts as a back-up to the AC turbo oil pump. The DC motor- driven pump is normally in standby (not running) but will automatically start when the discharge pressure from the AC motor-driven turbo pump drops off.

4. An essentially powered AC motor-driven circulating oil pump draws oil from

the engine sump and circulates it through the main lube oil filter, the lube oil cooler, and the main lube oil gallery. This pump is always kept running to provide pre-lubrication of the engine with warm, filtered oil.

c. Jacket water cooling system - each emergency diesel engine water jacket cooling

system includes a heat exchanger, expansion tank, lube oil cooler, automatic cooling water temperature regulating valve, and engine-driven water pumps. Jacket cooling water is circulated in a closed loop through the engine lube oil cooler, the engine cooling water passages, and the shell side of the raw water heat exchanger. The raw water flowing through the tube side is a part of the component cooling water system. An electric immersion heater powered from an essential source is provided in the diesel engine jacket water system, and is controlled by a temperature switch. The immersion heater keeps both the jacket water and lube oil systems warm during standby conditions to enhance reliability and fast starting of the emergency diesel generator set. The heated water is circulated by thermo-siphoning through the lube oil cooler where the circulating oil gets heated up, and is maintained above 85°F. A low jacket water temperature alarm monitors the operation of the immersion heater. (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems)

d. Fuel oil system - the diesel oil system includes seven days storage of fuel oil for each emergency diesel generator. This system consists of the emergency diesel generator day tank, bulk storage (week) tank, pumps, and associated piping and valves to the respective diesel generator. The oil storage tank and the fuel oil transfer system are designated as Class 1E structures within the meaning of

IEEE 308. A complete description of the diesel fuel oil system is given in Subsection 9.5.4. The fuel oil filtering system is composed of a number of devices to guarantee fuel oil purity. Before entering the suction of the engine driven fuel pump, the oil passes through a strainer which protects the pump. The oil discharged from the pump then passes through a duplex cartridge filter. The fuel supplied by the DC motor-driven, redundant fuel pump is filtered in the same manner as that supplied by the engine driven pump, except that a duplex basket strainer is used on the suction of the pump. (Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems, and Figure 9.5-10 - Diesel Generator Day Tank Location)

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-12 UFSAR Rev 32 9/2018

The factors which are used to determine that the emergency diesel generator day tank capacity is sufficient for approximately 24 hours at 110 percent full load operation are as follows:

The emergency diesel generator day tank normally stores approximately 5000 usable gallons of fuel oil, (4728 gals at the tank low level switch setpoint for starting the Transfer Pump to 5155 gallons at the tank high level switch setpoint for shutting off the Transfer Pump). At 100 percent rated load, 5000 gallons of usable fuel oil is sufficient to continue operation for approximately 25 hours. If loading is 110 percent this quantity of fuel oil is sufficient to continue operation for approximately 23 hours, assuming a reasonable increase in the fuel oil consumption rate (lbs. of fuel oil per bhp per hour) above the rate at 100 percent load. However, a low-low level alarm is established with approximately 4530 gallons usable fuel still remaining in the tank. This quantity of fuel oil can maintain full load diesel operation for approximately 23 hours or approximately 21 hours at 110 percent loads, assuming the same reasonable increase in the fuel oil consumption rate used earlier.

e. Air intake and exhaust systems - the air intake structure and filtering system for

each diesel consists of an intake filter assembly, an intake silencer, and interconnecting piping to the diesel engine-mounted air inlet flexible connector. The filtered air then enters the impeller-end of a turbocharger where its pressure is increased for combustion and exhaust gas removal. The exhaust system consists of an engine-mounted manifold, turbine-end of the turbocharger, and inter-connecting piping to an exhaust silencer. (Figure 9.5-8A - Diesel Generator Air Start System) The physical arrangement of the air intake and exhaust for the emergency diesel generators is shown in Figure 8.3-13 - Auxiliary Building Sections, and Figure 9.5-10 - Diesel Generator Day Tank Location. The air intake filter and intake and exhaust silencers are located outside at the roof top of the auxiliary building above the diesel rooms. Suitable enclosures are provided to protect the filter and silencers from missiles, tornadoes, snow, rain, etc. Since the air intake is located outside of the diesel building, there is no possibility of fire extinguishing agents being drawn into the air intakes. The physical separation of the intake and exhaust preclude significant recirculation of exhaust gas into the air intake.

f. Excitation and voltage regulating system - a solid state excitation and voltage

regulating system of the series boost static regulator type, is provided for each emergency diesel generator unit. The exciter is of the static type having fast response characteristics and reliability for allowing the startup of a heavy load parallel with a running load. The voltage regulator is a static type with silicon type rectifiers and provides the necessary excitation control to maintain the adjusted generator voltage with the generator operating at loads ranging from zero up to and including its overload capacity at rated power factor and frequency. The generator reactance’s, excitation system, and regulator response time are such that adequate voltage is provided to meet automatic loading requirements in accordance with AEC Safety Guide 9. The electric power supply for field flashing will be taken from the respective station battery. Sufficient electrical instrumentation is furnished to survey the variables required for successful operation of the excitation and voltage regulation system.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-13 UFSAR Rev 32 9/2018

Electrical instrument power supplies will be 120V AC and 125V DC from redundant essential instrument power distribution panels. Sufficient mechanical and electrical instrumentation is provided for each emergency diesel to survey the variables required for successful operation. The systems monitored included the starting system, lubrication system, fuel system, cooling system, combustion air system and exhaust system.

Separation/Hazards

Figure 3.6-3 indicated the physical arrangement of the diesel generators, fuel oil day tanks, and starting air system. Physical separation is provided to each diesel generator and its associated auxiliary systems. The floor drains in the two EDG rooms are interconnected, and therefore not physically separated and independent. An evaluation of this common drain design verified that no credible single event would disable both EDG units (see also Flooding in this subsection). The redundant emergency diesel generating units are located in separate, adjacent rooms in the Seismic Class I auxiliary building (also see Subsection 8.3.1.1.8). A fire wall and door are provided between the two rooms. The local control and auxiliaries for each emergency diesel generating unit are located in the same room as the diesel with which they are associated.

Missiles

Internal missiles generated by one unit will not affect the redundant unit since the walls act as missile barriers. A high crankcase pressure switch is provided which will alarm. These units are located in the auxiliary building which is protected from external missiles generated by a tornado. There are no other external missiles which can affect these units.

Fires

Each diesel generator room is protected by a pre-action sprinkler system. Water is admitted to the system through an automatically actuated valve located outside the diesel generator rooms, which is automatically activated by photoelectric smoke detectors. Pressure switches are provided. Photoelectric smoke detectors are provided for alarm. In addition, a hose station and portable fire extinguishers are provided for each room. The diesel oil day tank rooms are protected with a wet pipe, automatic sprinkler system. Flow switches are also provided. Fire walls and doors separate each diesel generator and its associated auxiliary systems.

Flooding

Four-inch drains are provided in each room to accommodate fire suppression water, fuel oil spills or leak in a diesel engine heat exchanger component cooling water line. The floor drains in these two rooms are tied together and the drainage rate is limited due to the oil interceptor that these drains connect to. Fire suppression activities that introduce water at a rate in excess of the capacity of this common drain system require that the one of the outside doors to one of the rooms be opened or suppression activities minimized to prevent flooding in both rooms. See Table 9.2-6 for a single failure analysis of the component cooling water line.

Mechanical Failures The intake, exhaust, fuel oil, cooling water, and lube oil systems are independent systems for each diesel generator unit.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-14 UFSAR Rev 32 9/2018

The starting air systems are interconnected. Each compressor charges one air receiver for each unit. One compressor can be lost with the redundant compressor capable of charging one air receiver for each unit. Likewise, the loss of one air receiver and its associated piping and valves will not prevent starting from the redundant air receiver. In addition, a third swing compressor can be aligned to act automatically as either of the other two compressors. Interconnecting piping between redundant starting systems is typically isolated by double valving. However, with other alignments, such as the third compressor in service, interconnecting piping between redundant starting systems is isolated minimally by a single manual valve, as can be seen in Figure 9.5-8A. Also, there are two air lines on each EDG that tap off downstream of the air start solenoid valves, pass through a check valve, and then combine into a common header for the hydraulic governor air booster servomotor. The check valves prevent air back-leakage into the other air side.

Auxiliary Support Systems

The following are Seismic Class I auxiliary systems which supply the emergency diesel generator rooms of the auxiliary building:

- Fuel Oil System: this system is fully described in Subsection 9.5.4 and 8.3.1.1.4.1.

(Figure 9.5-10 - Diesel Generator Day Tank Location, and Figure 9.5-8 - Emergency Diesel Generator Auxiliary Systems) A Seismic Category 1, missile protected, fuel oil storage and transfer system that meets IEEE 308 requirements is provided.

- Component Cooling Water System: this system is fully described in Subsection 9.2.2. (Figure 9.2-2 - Component Cooling Water System) Subsection 8.3.1.1.4.1 describes, in detail, the diesel generator jacket water cooling system.

- Ventilation System: this system is described in Subsection 9.4.2.1.2. Subsections 9.4.2.1.2.3 and 9.4.2.1.3.3 describe, in detail, the emergency diesel generator room ventilation system. During the winter, heating for the emergency diesel generator rooms is supplied by means of an electric heating system which maintains a 60°F minimum temperature with an outdoor design temperature of -10°F. In addition, the ventilation fans in each room automatically start whenever the diesel in that room is operating. Outside air is mixed with the recirculation air, as required, to maintain design conditions in the room. The fan motors are energized from the essential 480V motor control centers to guarantee their availability.

- Station batteries: as noted in Subsection 8.3.2.1.4, some battery power has been assigned to each emergency diesel generator. This assignment is for control and field flashing, not for cranking service.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-15 UFSAR Rev 32 9/2018

8.3.1.1.4.2 Alternate AC Source - Station Blackout Diesel Generator The purpose of the non-class 1E 4.16kV, 2865KW Station Blackout Diesel Generator (SBODG) is to provide AC power to all systems required for coping with a Station Blackout as defined in 10CFR50.2. This alternate AC power source meets the criteria specified in Appendix B to NUMARC 87-00, “Guidelines and Technical Bases for NUMARC Initiative Addressing Station Blackout at Light Water Reactors” and in Regulatory Guide 1.155, “Station Blackout.” The SBODG and support systems (auxiliaries), except the engine radiator, are located in a separate structure south of the Station within the protected area. To protect the SBODG from likely weather events which could initiate a loss of off-site power, this structure shall conform to Ohio Basic Building Code. Additionally, all cabling between this structure and the Station is routed through buried duct bank. The SBODG engine radiator is designed for outdoor installation. Two 1200 amp circuit breakers in series connect the SBODG to the Station’s nonessential 4.16 kV Bus D2. The circuit breaker which is at Bus D2 is normally closed and supplies power to SBODG auxiliaries during standby conditions. Closing the normally open 1200 amp circuit breaker which is located in the SBODG building connects the generator to Bus D2. During emergency conditions, power to the SBODG auxiliaries is supplied by the generator itself. The SBODG is capable of supplying either of the Station’s essential 4.16kV buses through nonessential Bus D2 and is available within ten minutes of the onset of Station Blackout. During an emergency, the SBODG can be manually started and loaded onto Bus D2 from the Control Room auto starting and loading is not provided. Operation of circuit breakers to make an SBODG line up to either essential bus can also be accomplished from the Control Room. The SBODG is capable of unattended operation at rated full-load for at least four hours. The SBODG has the following ratings and characteristics: Continuous Rating 2865kW, 3580kVA 2000 Hour Peaking 3135kW, 3918kVA Power Factor 0.8 Reactances xd = 2.35 xd’ = 0.42 xd” = 0.27 A 125V battery system is included among the SBODG auxiliaries. These batteries have sufficient capacity to maintain DC control power and diesel-generator starting and loading ability. SBODG Breaker AD213, which is normally closed, receives control power from the Station’s Train 2 D.C. Distribution System. A compressed air system is used for SBODG engine starting. The primary system components are two ASME Code VIII air receivers and two electric motor driven air compressors. The fuel oil supply for the SBODG engine is separate from the fuel oil supply used by the Station’s Emergency Diesel Generators. The SBODG fuel oil supply tank has enough capacity to provide an eight-hour supply with the generator at rated load. Four hours of fuel must be stored in this tank to meet the Site’s Station Blackout duration. The SBODG building is protected by fire protection systems. The diesel engine cooling system is a closed loop system. Cooling is provided using a force draft radiator with engine-driven cooling water pumps.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-16 UFSAR Rev 32 9/2018

SBODG testing follows the recommendations presented in Appendix B of NUMARC 87-00. To facilitate testing, a sync-check relay prevents paralleling the SBODG with the auxiliary transformer or either start-up transformer until the generator has been manually synchronized. 8.3.1.1.5 480V AC Auxiliary System The station 480V AC distribution system consists of: Two 1000kVA 4160-480V AC essential unit substations (E1 and F1) for the supply of power to

the 480V AC safety loads. Six 1000kVA, 13800-480V AC nonessential unit substations (E2, E3, F2, F3, EF4, and EF6) for

the supply of power to the 480V AC normal auxiliaries. One 1000kVA, 4160-480V AC nonessential unit substation (F7) for the supply of 480V AC to

Station Auxiliaries. One 225kVA, 4160-480V AC distribution center for supplying 480V AC power to the station

blackout diesel generator auxiliaries. Two 750kVA, 4160-480V AC lighting substations (E5 and F5) for station lighting. One 112.5kVA, 4160-480V AC outdoor distribution center for outdoor lighting. Two 500kVA, 4160-480V AC switchyard distribution centers for supplying 480V AC power to the

switchyard. See Figures 8.3-14 through 8.3-18. The two 4160-480V AC essential unit substations are double ended (two transformers) with transformer secondaries wye connected and the neutral high resistance grounded. The six 13800-480V AC nonessential unit substations are double-ended (two transformers) with transformer secondaries wye connected and the neutral solidly grounded, except for transformers AE3 and BF3, which are high resistance grounded. The capacity of each transformer is sufficient to permit station operation with one transformer out of service. The two 4160-480V AC essential and four of the 13800-480V AC nonessential unit substations have a single bus; each of the remaining two 13800-480V AC nonessential unit substations has a two bus arrangement with a tie breaker between the buses. Each 4160-480V AC essential unit substation is supplied from its corresponding 4160V AC essential bus through redundant normally closed 1200 ampere circuit breakers; one feeder is connected to the primary side of each transformer. The transformer secondary side is connected to the 480V, 1600 amp bus through a 1600 amp circuit breaker. During normal operation both of the essential 4160-480V AC unit substation transformers are energized with one transformer carrying the load and the second transformer carrying no load. Transfer from one transformer to the other is by manual control only; automatic transfer is not provided. It is possible to accomplish either a live (bus energized) or a dead (bus de-energized) transfer at the operator’s discretion (see Figures 8.3-19 through 8.3-22). Each 13800-480V AC nonessential unit substation is supplied from alternate 13800V AC Buses A and B. Apart from the arrangement of the incoming primary feeders, four of these substations are designed to operate in the same manner as the essential substations. Each of the

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-17 UFSAR Rev 32 9/2018

remaining two substations has a manual transfer scheme between the two main circuit breakers and the bus tie circuit breaker such that only two breakers can be maintained in the closed position at the same time. The bus tie breaker is normally open. The 4160-480V AC nonessential unit substation F7 is supplied from 4160V Bus D2 through a normally closed 1200 ampere circuit breaker. The transformer secondary side is connected to the 480V AC 1600 amp bus through a 1600 amp circuit breaker. The nonessential 225kVA 4160-480V AC distribution center consists of a 480V AC motor control center BF81 which supplies power to the station black out diesel generator (SBODG) auxiliaries. The center is fed from transformer DF8, a 4160-480V transformer through breaker BF8105. Transformer DF8 is powered through a fuse from 4160V Bus D3 by either the SBODG via breaker AD301 or from Bus D2 via AD213. The normal feed for D3 (and DF8) is from Bus D2 breaker AD213. Each of the two lighting substations has a single bus arrangement and one transformer. The primary side of the transformer is connected to one 4.16kV AC nonessential bus. The secondary side is connected to the 1600 amp bus through a 1600 amp circuit breaker. The two lighting substation 480V AC buses are connected through a normally open tie breaker. Either transformer can supply the entire station lighting load. An outdoor distribution center supplies 480V AC power for outdoor lighting and other miscellaneous loads. The distribution center transformer is connected to one of two alternate 4.16kV sources through a manual throw-over switch. Two switchyard distribution centers are provided to supply the switchyard AC requirement of 480V AC and below. Each distribution center transformer is connected on the primary side to one 4.16kV AC nonessential bus. The 480V AC system also contains approximately 70 motor control centers about two-thirds of which supply nonessential station loads, and the remainder serve engineered safety features and other safety loads. The motor control centers are supplied from the unit substations. The equipment is arranged and switching accomplished such that the loss of any 480V bus or any single failure would deprive the station of only part of the safety-related equipment associated with that particular function. The remaining operational equipment will be adequate in these circumstances to allow the station to continue to operate and supply all safety functions (see Figures 8.3-23 and 8.3-24). The circuit breakers shown on Figure 8.3-2 identified as being “without automatic tripping device” and described as follows. The breakers are molded case type which have continuous current ratings equal to the frame size, but are not equipped with automatically operating over current circuit tripping elements. The breakers are designed to function as manually operated, high capacity disconnect switches only. Normal circuit protective functions are assigned to other system breakers, i.e., those breakers with over current tripping elements. The use of this type of breaker can be justified in the design of a Class 1E power system since, as stated previously, circuit protective functions are properly assigned to breakers equipped with automatic over current tripping elements or current limiting fused disconnect switches.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-18 UFSAR Rev 32 9/2018

The following is a description of the design of the Class 1E electric power systems downstream of the 480V switchgear buses “E1” and ‘F1” (Figure 8.3-2), to demonstrate conformance with IEEE Standard 308-1971 and Regulatory Guide 1.6. As noted on the revised Figure 8.3-2, all possible cross connections, except three, between buses “E1” and “F1“ and a fourth between “F1” and non-essential Bus “F7”, have been eliminated. These remaining four listed below, are designed with both electrical and manual mechanical interlocking to guarantee independence between buses “E1” and “F1” and between “F1” and “F7”; this conforms to Regulatory Guide 1.6, position 4 (d). In addition, transfer between “E1“ and “F1” and between “F1” and “F7” is non-automatic, and thus conforms to Regulatory Guide 1.6, positions 4 (a) through 4 (c).

a. Motor control center F13 is non-safety related. It has its associated incoming, non-

automatic circuit breakers, BF1310 and BF1304, mechanically interlocked by a Kirk key system which precludes having both breakers in the closed position at any one time. The associated upstream motor control center normal feeder breaker, BF705, at bus “F7” is automatically tripped by an electrical interlocking contact from breaker BF1304 if breaker BF1304 is open. Similarly, the upstream motor control center alternate feeder breaker, BF113, at bus “F1” is automatically tripped by an electrical interlocking contact from breaker BF1310 if breaker BF1310 is open. Thus there is no direct interlocking between buses “F7” and “F1“. In addition, an alarm in the control room is established if a non-normal breaker alignment (based on Figure 8.3-2) is set up.

b. Motor control center EF15 has a split bus arrangement, one bus for high speed

and the second for low speed operation of containment cooler fan 1-3. Kirk key type mechanical interlocking is provided between breakers BEF152 and BEF154 and between breakers BEF151 and BEF153. This prevents both paired breakers from being in the closed position at any one time. Breakers BEF151 and BEF152 are electrically interlocked with their associated upstream substation breaker BE105. In addition, breakers BEF153 and BEF154 are electrically interlocked with their associated upstream substation breaker BF105. The electrical interlocking is actuated to trip the substation breaker if either of its associated downstream breakers is open. An alarm in the control room is established if a non-normal breaker alignment (based on Figure 8.3-2) is set up.

c. Motor control center EF12C can be fed from either bus “E1“ or bus “F1“ via motor

control centers E12A or F12A, respectively. Kirk key type mechanical interlocking is provided between fused disconnect switches BEF121 and BEF122 in order to preclude having both fused disconnect switches closed at the same time. Electrical interlocking is provided between fused disconnect switch BEF121 and its associated upstream, latch-in type contactor at BE1280 of motor control center E12, section E12C and between fused disconnect switch BEF122 and its associated upstream, latch-in type contactor at BF1280 of motor control center F12, section 12C. In both cases, electrical interlocking prevents contactor closing if the associated downstream fused disconnect switch is open. The electrical interlocking also trips the contactor if the downstream fused disconnect switch is opened after the contactor has been closed.

d. Motor control center EF12D can be fed from either bus “E1” or bus “F1” via motor

control centers E12A or F12A. Kirk key type mechanical interlocking is provided

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-19 UFSAR Rev 32 9/2018

between breakers BEF128 and BEF129 in order to preclude having both breakers closed at the same time. Electrical interlocking is provided between breaker BEF128 and its associated upstream contactor at BE1207 on MCCE12A and between breaker BEF129 and its associated contactor at BF1224 on MCCF12A. In both cases, electrical interlocking prevents contactor closing if the associated downstream breaker is open.

8.3.1.1.6 120V AC Auxiliary System The station 120V AC system (see Figure 8.3-25) consists of: Four essential instrument distribution panels each supplied from a 125V DC/120V AC inverter. The four essential instrument distribution panels are comprised of six physical panels, Y1, Y1A, Y2, Y2A, Y3, and Y4. The two physical panels for Channel 1, Y1, and Y1A, are administratively controlled as a single panel, identified as bus Y1. The two physical panels for Channel 2, Y2, and Y2A, are administratively controlled as a single panel, identified a bus Y2. Buses Y3 and Y4 are each comprised of a single distribution panel. Two regulated instrument distribution panels each supplied from one 480/120V AC static voltage regulator. Two uninterruptible instrument distribution panels each supplied from a 250V DC/120V AC inverter. All inverters are fed from the DC power supplies as described in Subsection 8.3.2. Each of the four 120 volt single phase, 60 Hertz essential instrument distribution panels supplies power to one of the four channels in the reactor protection system and the safety features actuation system. The essential instrument AC system is arranged so that any type of single failure or fault will not prevent the reactor protection system or safety features actuation system from performing their safety functions. There are four independent panels available, and a single failure within the system can involve only one panel. A combination of simultaneous failures or faults on any two of the channels will trip the reactor and trigger the safety actuation system. The inverter and rectifier for channels 1, 2, 3, and 4 are equipped with a static automatic bypass switch for fault clearing capability and for maintaining power to the 120V AC essential distribution panels upon inverter failure. The alternate source for channels 1 and 3, and 2 and 4 inverters are essential 480V AC busses E1 and F1 respectively through a 480/120V AC constant voltage transformer (CVT). Although the essential CVT is available as a maintenance backup source, a non essential regulated instrumentation distribution panel is also available as an alternate source to the 120V AC distribution panel via manual transfer. Each uninterruptible instrument distribution panel is fed from one 50kVA single phase, 60 Hertz 250V DC/120V AC inverter and supplies important non-safety related loads, as shown in Figure 8.3-25. Each of the two regulated instrument panels is fed from one of two static voltage regulators, from a separate AC source, and supplies non-safety-related instrument and miscellaneous controls.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-20 UFSAR Rev 32 9/2018

8.3.1.1.7 Channels Davis-Besse Nuclear Power Station Unit No. 1 has four essential Channels 1, 2, 3, and 4. 8.3.1.1.8 Physical Arrangement of the AC Electrical System Components The physical locations of electrical distribution system equipment are such as to minimize vulnerability of essential circuits to physical damage as a result of accidents. Redundant Class 1E distribution switchgear (both medium and low voltage), some motor control centers, and distribution panels are located in separate, rooms in the Seismic Class I auxiliary building. In two cases, where redundant Class 1E motor control centers are located within the same room, horizontal separation distances are 6 and 17 feet. The MCCs separated by 6 feet have a block wall fire barrier located approximately midway between them. The locations are as follows: (See Figures 8.3-31 through 8.3-34.)

a. The auxiliary, startup, and bus tie transformers are located out of-doors, physically

separated from each other. Lightning arresters are provided for the startup transformers. All outdoor transformers are protected by automatic water spray systems to extinguish oil fires quickly and prevent the spread of fire. Fire walls are installed between transformers to minimize the exposure to fire and mechanical damage.

b. The medium voltage switchgear buses are located indoors in physically isolated

rooms as follows:

13.8kV bus A and 4.16kV buses C1 (Channel 1) and C2 are located in room 325; 13.8kV bus B and 4.16kV buses D1 (Channel 2) and D2 are located in room 323; 4.16kV manual transfer breakers (Channel 3) are located in room 324.

c. Low voltage switchgear room 428 contains the following:

480V AC unit substations F1 (Channel 2) and F2; 480V AC motor control center F12A (Channel 2); 480V AC motor control center F14 (Channel 2); 480V AC motor control center F15 (Channel 2); 480V AC motor control center F16A (Channel 2); 120V AC panel Y2 and 125V DC/120V AC inverter YV2 (Channel 2); 120V AC panel YBU and 250V DC/120V AC inverter YVB; 480-120V AC Constant Voltage Transformer XY2 120V AC regulated panel YBR and 480V/120V AC static voltage regulators XYB;

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-21 UFSAR Rev 32 9/2018

480V AC lighting substation F5 (non-essential). The other 480V AC lighting substation E5 is located in the turbine building

d. Low voltage switchgear room 429 contains the following: 480V AC unit substations E1 (Channel 1) and E2; 480V AC motor control center E12A (Channel 1); 480V AC motor control center E14 (Channel 1); 480V AC motor control center E15 (Channel 1); 120V AC panel Y1 and 125V DC/120V AC inverter YV1 (Channel 1); 120V AC panel YAU and 250V DC/120V AC inverter YVA; 120V AC regulated panel YAR and 480V AC static voltage regulator XYA. 480-120V AC Constant Voltage Transformer XY1

e. Low voltage supply room 428B contains 120V AC panel Y4 and 125V DC/120V AC

inverter YV4, both Channel 4. 480-120V AC Constant Voltage Transformer XY4

f. Low voltage supply room 429A contains the following:

120V AC panel Y3 and 125V DC/120V AC inverter YV3, both Channel 3; 480-120V AC Constant Voltage Transformer XY3 480V AC motor control center EF15 (Channel 3).

g. The remaining 480V AC motor control centers are located indoors in areas of

electrical load concentration. Physical separation is maintained between essential motor control centers fed from redundant channels.

h. The redundant Class 1E emergency diesel generating units which serve as the

standby power supplies are located in separate, adjacent rooms (318 and 319) in the Seismic Class I auxiliary building. A fire wall and door are provided between the two rooms. Starting air for each diesel is provided by independent air reservoirs, two (2) per diesel, one (1) for each set of starting motors.

The local control and auxiliaries for each emergency diesel generating unit are located in the same room as the diesel with which they are associated.

i. Four separate rooms, two on the east and two on the west side of the containment,

are provided for electrical penetrations. The two rooms on each side are on different floors (see Figure 8.3-33).

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-22 UFSAR Rev 32 9/2018

Class 1E containment electrical penetrations carry only Class 1E circuits except as noted below. Redundant Class 1E containment electrical penetrations are widely dispersed around the circumference of the containment. Wherever possible, redundant circuits are run through separate penetration rooms. The center-to-center spacing between penetrations at the outside of the containment is 32 inches horizontally and 60 inches vertically. Separate penetrations are provided for power, control and instrumentation cables. For essential redundant systems in a given penetration room, penetrations are kept as far apart as possible, and in no case will they be less than 9 feet apart. Cables in the annulus space are installed as shown on Figure 8.3-34. The minimum physical separation for redundant electrical penetrations inside the containment are listed below:

1E Channels Distance

1 to 2 22’ 1 to 3 24’ 1 to 4 23’ 2 to 3 10’ 2 to 4 21’ 3 to 4 24’

As discussed in Subsection 8.3.1.2.29, all containment electrical penetrations, regardless of circuit function assignments, are designed and tested to meet IEEE Std. 317-1971. Conax penetration assemblies were designed and tested to meet IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2. Cables which are part of Class 1E circuits are assigned to penetrations which are exclusively dedicated to Class 1E service, whereas cables which are part of non-Class 1E circuit functions are assigned to penetrations dedicated for that service. Exceptions are as follows: 1. The non-Class 1E cables that feed the motor space heaters associated with

two containment cooler fans. These heater circuits are de-energized when the fans are running.

2. The cables for the Reactor Vessel Vent Line Temperature thermocouples,

which are non-Class 1E circuits that utilize a penetration dedicated exclusively to Class 1E instrumentation circuits. This situation has been analyzed and found to have no adverse affect on Class 1E circuits in the same penetration.

3. The non-Class 1E cables associated with Containment Recirculation Fan 2

motor. These cables were originally Class 1E and were later downgraded to non-Class 1E. However, they physically remain with Class 1E circuits, and are considered associated Class 1E circuits. They have been evaluated and found not to present the potential to degrade the integrity of their Class 1E power supplies.

Redundant Class 1E containment electrical penetrations are widely dispersed around the circumference of the containment.

The electrical penetration assemblies are described in Subsection 3.8.2.1.10.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-23 UFSAR Rev 32 9/2018

j. The applications, installation and routing of control, instrumentation and power cables are such as to minimize their vulnerability to damage from any source and to maintain the integrity of their respective redundant channels and/or branches.

k. All Class 1E cables are run in solid bottom trays when not in embedded conduit,

exposed conduit, or wireway except for cables in the annulus space and manholes, In general, all Class 1E powercables are run in conduit except for those instances mentioned in Subsection 8.3.1.2.19.

l. The locations of redundant Class 1E actuated equipment such as pump drive

motors and valve operating motors have been reviewed to ensure the minimum required functional capability despite any single design basis event or result therefrom.

8.3.1.1.9 Tests and Inspections The AC electrical systems are designed to permit testing and inspecting the operability and functional performance of the components of the system as well as the operability of the system as a whole. Essential and safety-related systems are provided with complete redundancy to permit testing of one system while the redundant system is performing the same function. This ensures no interruption of station operation. The 345kV circuit breakers will be inspected, maintained and tested on a routine basis. This can be accomplished without removing the generator, transformers and transmission lines from service. Transmission line protective relaying will be tested on a routine basis. This can be accomplished without removing the transmission lines from service. Generator and unit auxiliary transformer relaying will be tested when the generator is off line. Startup transformer relaying will be tested while the transformer is off the line. The 13800, 4160 and 480 volt circuit breakers and associated equipment may be tested while individual equipment is shut down. The circuit breakers may be placed in the test position and tested functionally. The breaker opening and closing may also be exercised. Circuit breakers and contactors for redundant or duplicated circuits may be tested in service without interfering with the operation of the unit. Manual and automatic transfer schemes among the various power sources will be tested on a routine basis to prove the operability of the system. The capability of the essential buses to provide power to engineered safety features components will be demonstrated as part of the surveillance requirements of the station Technical Specifications. Additionally, continuous normal operation of selected service water and component cooling pumps on the 4160V essential buses, of selected containment air cooler fans on 480V essential buses, and operation of the RPS, SFAS, and radiation monitoring systems on the 120V AC essential instrumentation buses will verify essential power availability. Emergency diesel generator availability will be verified according to Technical Specifications. Local indication of 480V fused disconnect switch status is provided at the fused disconnect switch MCC bucket. A “status” light provides visual confirmation of a satisfactory circuit status for all 3 phases, which indicates fuse condition and disconnect switch closure.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-24 UFSAR Rev 32 9/2018

8.3.1.1.10 Administratively Controlled Devices Administratively controlled circuit opening devices are listed in Table 8.3-2 by device number, type and location. 8.3.1.1.11 Cross Ties Between MCC E11B and F11A The primary and backup boron dilution flow paths each have a Train 1 and Train 2 essentially powered isolation valve in series. These four valves are:

Line Valve Channel MCC Valve Location MCC Location Primary Flowpath Auxiliary pressurizer spray HV2735 1 E11B Inside cont.

El. 585’ Room No. 304

Auxiliary pressurizer spray HV2736 2 F11A Outside cont

El. 603’ Room No. 427

Backup Flowpath Decay heat suction HVDH11 2 F11A Inside cont.

El. 603’ Room No. 427

Decay heat suction HVDH12 1 E11B Inside cont.

El. 585’ Room No. 304

Should one of the two redundant emergency diesel generators fail, should the 4 kV bus C1 or D1 fail, or should 480V bus E1 or F1 fail; it would be necessary to provide power to at least one of the affected two valves from the unaffected power supply. This would be accomplished by administratively utilizing the tie path between MCC F11A and MCC E11B as provided in Davis-Besse Emergency Operating Procedures (refer to Figures 8.3-23 and 8.3-24). Interconnecting cables are designated as Channel 12 and are run in conduit dedicated exclusively for these cables. 8.3.1.1.12 Motors All safety related Limitorque actuators shall be purchased to a specification which insures the motor will be able to perform its intended safety function with 70 percent of motor rated nameplate voltage, or, on an individual basis where the 70 percent of motor rated nameplate voltage does not apply, be purchased to a percentage of rated nameplate voltage which assures satisfactory operation under all required conditions. While most initial purchase specifications required valve operation at 70 percent terminal voltage; in some cases subsequent evaluations have determined that required torque is greater than originally determined. In those cases operation of the valve has been established using available voltage at the Limitorque actuator’s terminals, as determined by calculation. 8.3.1.2 Analysis The station AC electrical system as described under Sections 8.2 and 8.3 ensures the following:

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-25 UFSAR Rev 32 9/2018

8.3.1.2.1 Switching Three physically independent transmission lines are provided from the transmission network to the station switchyard minimizing power failure due to faults in the network interconnection and the associated switching (see Subsection 8.2.1.1). 8.3.1.2.2 Independent Circuits Three independent circuits are provided to supply power to the onsite electrical distribution system, and with any two circuits in service the requirements of NRC General Design Criterion 17 are fulfilled. 8.3.1.2.3 Onsite Standby Emergency Diesel Generator Units Two onsite standby emergency diesel generator units are provided. Independence and physical separation between the two units and between each unit and the other power sources is maintained so that no credible single event will disable more than one unit. The floor drains in the two EDG rooms are interconnected, and therefore not physically separated and independent. An evaluation of this common drain design verified that no credible single event would disable both EDG units (see also Flooding in Subsection 8.3.1.1.4.1). 8.3.1.2.4 Power Distribution System The two engineered safety features power distribution systems are connected to different 4.16kV essential buses, and they are redundant in that completion of the starting and loading of one emergency diesel is adequate to satisfy the minimum engineered safety feature requirements. 8.3.1.2.5 DELETED 8.3.1.2.6 Parallel Operation Parallel operation of the emergency diesel generators is not permitted. 8.3.1.2.7 Testing During modes 1, 2, 3, or 4 an emergency diesel generator (EDG) can be tied to the grid (loaded) only if the other EDG is operable. If one EDG is inoperable during modes 1, 2, 3, or 4, the remaining operable EDG can be started for testing, but shall not be tied to the grid (loaded). In modes 5 or 6 with one EDG inoperable, the remaining operable EDG can be started and may be tied to the grid (loaded) for testing purposes. lf the remaining operable EDG is loaded in modes 5 or 6, the Technical Specification requirements for the required EDG being inoperable shall be followed. 8.3.1.2.8 AC Electrical System The station essential AC electrical system consists of two electrically isolated and physically separated load groups. Each has access to normal (unit auxiliary transformer), reserve (startup transformer), and onsite standby (emergency diesel generators) power sources.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-26 UFSAR Rev 32 9/2018

8.3.1.2.9 Controls Automatic and manual controls are provided to permit the following:

a. selection of the most suitable power source for the distribution system; b. disconnecting the appropriate loads when normal and reserve sources are not available; c. starting and loading the standby power supply.

8.3.1.2.10 Electric Power Systems and equipment that provide electric power for the safe shutdown of the reactor are classified as Class 1E (essential) and are designed to perform their functions when subjected to any design basis event. The variation of voltage and frequency during switching of such equipment will not degrade the performance of any load to the extent of damaging the reactor coolant system or fuel rods. 8.3.1.2.11 Protection Systems Protection systems are provided and designed to initiate automatically the operation of the appropriate equipment. Necessary protective devices are provided to isolate failed equipment and to identify the equipment that has failed. For the protection system related to the engineered safety features and essential functions, complete redundancy, independency, and inservice testability is maintained. 8.3.1.2.12 Instrumentation Essential instrumentation, control, and power requirements are supplied by reliable, independent, and redundant sources designed to ensure that no single failure will result in loss of power to safety-related equipment. 8.3.1.2.13 Periodic Testing All essential electrical systems are designed to permit periodic testing of the operation of individual system components with the station in operation. 8.3.1.2.14 Cables and Raceway Functions Cable functions are divided into three categories: Power (P), Control (C), and Low Level Instrumentation (L). In addition cables are classified according to their service as essential and non-essential. Cable tray and wireway are classified according to their service as carrying essential and nonessential cables and according to their function. Conduit are only classified according to their service. Four essential channels are provided.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-27 UFSAR Rev 32 9/2018

Essential Channels

Cables are identified with the color and by the first digit of the cable number corresponding to the channel, and the second character corresponding to the function as follows:

Channel Function

Designation Color Designation

1 Green Power (P) 2 Orange Control (C) 3 Light Blue Instrumentation (L) 4 Maroon

Cable tray and wireway are identified with the label background color corresponding to the channel, and the color of the label alphanumeric identifier corresponding to the function. The first digit of the identifier indicates the channel and the second character indicates the function.

Channel Function

Designation Color Designation Color

1 Green Power (P) Black 2 Orange Control (C) White 3 Light Blue Instrumentation (L) Yellow 4 Maroon

Conduit containing essential cables are banded with the color associated with the essential channel. Scheduled conduit (excludes lighting and communication circuits) in Containment and the Auxiliary buildings have an alphanumeric identifier which is stamped on a metal tag and attached to the conduit. Function is not included in the labeling of any scheduled conduit.

Interconnections Between Essential Channels

The 2 out of 4 logic design of the NI/RPS & SFAS necessitates running interconnecting cables between control room cabinets having different essential channel designations. The identifiers are 12, 13, 14, 23, 24, and 34. Each cable is marked with the color corresponding to the channel which is designated by the first character of the cable number. For example. cable number 12SFSP01 means that the cable runs between Channel No. 1 and Channel No. 2 cabinets and is colored green which corresponds to Channel No. 1. The interconnecting cables between the SFAS cabinets of different channels and between the RPS cabinets of different channels are routed through raceways that are independent of any other raceway. Interconnecting cables having different identifiers do not share a common raceway once outside the cabinets. Wireways containing the interconnecting cables have the same identifier as the cables, i.e., the first two characters of the raceway number are the same as the first two characters of the cable number. External to the SFAS/RPS cabinets physical separation is required between interconnecting cables that are prefixed with 12, 13, 14, 23, 24 or 34. Physical separation is achieved by

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-28 UFSAR Rev 32 9/2018

installing the differently prefixed cables in independent raceway system. Cables having the same prefix (identifier) share the same raceway. The interconnecting cables may contact non-essential cables of any channel (A, B, or C) provided bridging does not occur. (Bridging occurs when a single non-essential cable or conductor is simultaneously bundled, routed, or formed with cables or conductors of two different essential channels.) Raceways connected to the RPS, with the exception of those used for NI loops, do not contain voltages in excess of the isolation device circuit ratings. The NI loop cables have a working voltage of 1200V for the intermediate and power range channels and 2400V for the source range channels. These cables, however, are run entirely in their own separate conduits from the detectors to the RPS cabinets.

RPS and SFAS In-Cabinet Isolation

As discussed in Subsection 7.3.2.3, physical separation between redundant channels of the SFAS is accomplished by locating each redundant channel in a separate cabinet assembly. Internal to the SFAS cabinets, physical separation is maintained between interconnecting cables and input sensor cables. Physical separation is required between interconnecting cables and non-essential cables where bridging could occur. All cables pass through fire stops at cable entrances/exits. Isolation is provided between trip signals in interconnecting cables and essential cables. The isolation device circuits are designed to withstand the effects of short circuits, open circuits, grounds, electrical transients and the application of AC or DC potential as listed below:

1. Analog signal isolation device circuits are capable of withstanding a maximum of 600V DC or AC peak across their output without affecting the input. 2. Digital signal isolation device circuits have a minimum dielectric strength rating of 450V AC (RMS) between the input and output signals.

The isolation device circuit includes the isolation device, internal wiring and field wiring connection terminal strips. No single failure of an isolation device circuit will compromise the operating ability of the redundant system. Analog signal isolation devices, with individual power supplies, are provided between the sensing channel and the logic channel. Digital signal isolation devices are provided between the logic channel trip bistables and the output modules of the actuation channel. Electrical noise transient testing was performed on the SFAS equipment during system functional testing at the vendor facility. Noise transients were generated in close proximity to all interconnecting wiring including essential and nonessential wiring. All equipment was operational with inputs and outputs simulated. It was verified that the equipment operation was not affected by the transients. The noise test report has been submitted as part of the docket under separate cover. As a further precaution against electrical noise, particularly radio interference, no portable radio transmitters (with attached transmitting antenna) or any other radio transmitting antennae will be allowed in the control/cabinet room or cable spreading room.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-29 UFSAR Rev 32 9/2018

A test program was implemented by TED to demonstrate the adequacy of noise rejection isolation devices and internal cable routing of the RPS and SFAS for credible electrical faults introduced from non-Class 1E systems and equipment. An evaluation of the Station and Instrument Ground Systems at the Davis-Besse Nuclear Power Station was performed by the Lawrence Livermore National Laboratory, California. The reactor protection system was subjected to electromagnetic, electrostatic, and noise level tests. Also, system isolation tests were performed on selected devices of the RPS. A complete test description (test parameters, schematics, equipment list, procedures, and specifications) for each test was submitted by Toledo Edison Co. Each test consisted of four basic parts: type of test, acceptance criteria, pretest values, and post-test values. After the system or device was subjected to a selected type of test, the test values were analyzed to determine if the system or device failed to meet the acceptance criteria. The scope of the testing for the SFAS was to demonstrate that the isolation capability of the digital and analog isolation devices are not degraded to unacceptable levels following the inadvertent application of postulated electrical faults in excess of normal operating currents. Also, that due to the intermix of non-Class 1E and Class 1E signal wiring, postulated electrical faults appearing on the non-Class 1E circuitry will not produce unacceptable effects in the Class 1E circuitry by means of mutual inductance and/or capacitive coupling. The isolation device testing consisted of testing one of each type of device used in the SFAS Class 1E to non-Class 1E circuitry, while system testing consisted of utilizing one complete channel of the SFAS. Based on the above, the isolation noise testing performed on the RPS and SFAS was found to be acceptable. The reactor protection system has adequately demonstrated its capability to perform the Class 1E protective functions when subjected to electrostatic, electromagnetic, isolation and noise level tests. The above tests, performed to NRC approved test methods and MIL-N-19900B as required, concluded that:

(1) no significant degradation to the Class 1E circuitry occurred as a result of the fault tests; (2) no spurious trips or resets of the relays occurred as a result of the fault tests; and (3) no spurious trips, resets, or reactions of the SFA system occurred as a result of the fault tests.

NRC reviewed the tests and documents submitted and issued a Safety Evaluation Report accepting the tests and results, concluding that an analysis and testing of the ground grid systems has been conducted per NRC criteria and the ground ties found in the ground grid systems which do not meet design criteria have been isolated and corrected. As discussed in Subsection 7.2.2.1, physical separation between redundant channels of the RPS is accomplished by locating each redundant channel in a separate cabinet assembly. The cabinet assembly provides physical protection of the cabinet internal equipment from external hazards such as missiles and fire. All openings between the cable spreading room and RPS

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-30 UFSAR Rev 32 9/2018

cabinets through which RPS cables pass, are sealed to prevent the passage of fire, smoke, and fumes. Internal to the RPS cabinets, the independence of redundant channels is maintained by isolation device circuits. The isolation device circuits have been tested and analyzed to protect against short circuits, open circuits, grounds, and the application of AC or DC potential as listed below:

1. Analog signal isolation device circuits are capable of withstanding a minimum of 400V DC or AC peak across their output without affecting the input. 2. Digital signal isolation device circuits have a minimum dielectric strength rating of 480V AC RMS between the input and output signals.

The isolation device circuits include the isolation device, internal wiring, and field wiring connection terminal strips. The isolation device is an isolation amplifier for analog signals and a relay for digital signals. The isolation device circuit internal wiring and field connection terminal strips have the same characteristics (flame retardancy, maximum operating temperature, dielectric strength) as the wiring and terminal strips used internally within the cabinets for Class 1E service. The isolation device circuits have been tested and analyzed by type tests and type analysis to establish the isolation device characteristics. The RPS isolation device circuits for Toledo Edison Davis-Besse 1 Nuclear Power Generation Station are production units of the circuits tested and analyzed by type. The isolation test report was submitted as part of the docket under separate cover. The RPS exhibits a high degree of immunity to the effects of electromagnetic and electrostatic- induced noise on non-Class 1E signal output leads and Class 1E input leads. The immunity to noise has been established by operating experience, tests, and noise-rejection circuits. The Noise Test Report was submitted as part of the docket under separate cover.

ASP In-Cabinet Isolation

Physical separation between redundant channels of the Auxiliary Shutdown Panel (ASP) is accomplished by locating each redundant equipment system and its terminations in separate and independent, fully enclosed subsections of the panel. Refer to Subsection 7.4.2.5 for additional design features for the ASP. Internal to the ASP, the separation of 1E and non-1E analog circuits is maintained by an isolation device circuit. The circuit configuration for the analog isolation in the ASP differs from the configuration used in the NI/RPS only in that the operational amplifier in the ASP is used in the non-inverted mode while the amplifiers in the NI/RPS are used in the inverted mode. The voltage isolation capabilities of the ASP configuration is very similar to that of the Nl/RPS. Analysis performed on the ASP circuits has shown the same isolation capabilities as the NI/RPS.

Clarification to Essential Channels of the SFAS

The logic of the safety actuation Channel No. 1 requires that both the terminating relays of sensing and logic Channels No. 1 and No. 3 be de-energized to initiate the actuation of Channel

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-31 UFSAR Rev 32 9/2018

No. 1. Similarly it is required that sensing and logic Channels No. 2 and No. 4 be de-energized to initiate actuation Channel No. 2. See Subsection 7.3.1.1.2. Approximately fifty percent of the field cable terminations of actuation Channel No.1 are made in the Channel No. 1 SFAS cabinets while the remaining field cables of actuation channel No. 1 are terminated in the Channel No. 3 SFAS cabinets. Similarly for actuation Channel No. 2, the terminating field cables are in Channel No. 2 and Channel No. 4 SFAS cabinets. The field cables are coded by the color of the actuation channel that it serves.

Nonessential Channels

Nonessential, i.e., non-Class 1E, functions are divided into channelized categories for improving station reliability. Classifications are alphabetized as contrasted to the numerical essential channels and are designated as Channels A, B, and C. Nonessential cables may have any mix of black, white, or yellow jackets when routed in raceways designed to carry nonessential cables. Nonessential cables that are routed in raceways designated to carry Class 1E cables are color coded, as a minimum:

1. At the exit/entrance of the shared raceway and at numbered junction boxes when the nonessential cable terminates at non-Class 1E equipment. 2. At the exit/entrance of the shared raceway, at numbered junction boxes, and at each end when the nonessential cable terminates at Class 1E equipment.

When non-essential cables are routed in raceways designated to carry essential cables (see Subsection 8.3.1.2.18), color coding is as follows:

Designation Color Channel A Dark blue Channel B Tan Channel C Silver Fleck

8.3.1.2.15 Cable Each cable is identified at each end with a cable number: the first digit indicates the channel, and the second digit indicates the function. In addition, the jacket of each essential cable is marked with the color corresponding to its channel every 5 feet (maximum) when in tray/wireway and at end points and intermediate pull points when installed in conduits. As a minimum, cable routed in conduits is color coded at the termination points and intermediate pull points. In addition, each essential cable is identified at each end with its associated alphanumeric designation as described above. 8.3.1.2.16 Safety Feature Actuation System (SFAS) and Reactor Protection System The Safety Features Actuation System and Reactor Protection System logic cabinets are painted in the corresponding channel colors.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-32 UFSAR Rev 32 9/2018

8.3.1.2.17 Markers Each tray carrying essential cables is identified with colored plastic markers at intervals averaging every fifteen (15) feet, in compliance with Paragraph 5.1.2 of Regulatory Guide 1.75 giving the tray number. The first digit of each tray number indicates the channel, and the second digit indicates the function. Where a mixture of functions occurs in a common tray or wireway (see Subsection 8.3.1.2.18, below, for cases where mixtures exist), the second digit of the tray or wireway number indicates the function of the majority of the cables in the raceways. Markers have background colors corresponding to the channel and the digit color corresponding to the function. The markers are color-coded on the basis of the majority of the cables in the raceway. Trays carrying control and instrumentation cables are amply sized to contain the required number of cables. Each essential conduit is color coded according to channel at all entry and exit points through which the conduits are run, as well as all attach points to equipment or trays. Control trays are those trays that contain conductors that carry continuously 10A or less at 150 volts or less. Instrumentation trays are those trays that contain conductors that carry 50 ma or less. 8.3.1.2.18 Essential Cables Essential cables only run in raceways specifically designated for the corresponding channel. Nonessential cables may run in raceways designed to carry essential cables; however, no nonessential cable will run in the raceways of more than one essential channel. Cables for a given function are only run in raceways designated for that function, except (1) that small motor-operated valve leads and solenoid valve leads may be classified as control cables and routed accordingly and (2) where physical limitations prevent the installation of independent raceways for a given function (a mixture of functions occurs in the following raceways: 1CJQ10, 1CJR10, 1CJS10, 3LP63D, 4LP56D, 1PGS01, and 1PGS03). Exception (1) is allowed since the operating voltage of the control and power section of a particular valve circuit (solenoid or small motor operated valve) are the same (120 volts) and are actually derived from the same power supply. Consequently, classifying and routing the entire circuit as control is of no concern. Exception (2) concerning raceways 1CJQ10, 1CJR10, and 1CJS10 is allowed since both 480-volt power and 120 volt control are derived from the same motor control center (MCCE11C), the lengths of raceways are very short (approximately 2 feet) and all cable contained therein has an insulation rating of 600 volts. Furthermore, these raceways are physical extensions of the MCC to the MCC crown box. Exception (2) concerning raceways 3LP63D and 4LP56D is allowed since the control cables carry low voltages (6 volts AC and 24 volts DC) and will not generate noise within the instrumentation cable which is shielded and twisted. In addition, these voltages are well below the ratings of the analog isolation devices in the SFAS as discussed in Subsection 8.3.1.2.14. The nonessential control cable that is run in raceways 1PGS01 and 1PGS03 is allowed since the nonessential cable does not come in contact with cables of more than one essential channel.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-33 UFSAR Rev 32 9/2018

Furthermore, there is no safety channel violation associated with any of these exceptions. 8.3.1.2.19 Power Cables All essential power cables are run in exposed steel or embedded nonmetallic conduit, except in the annulus space, in manholes, where physical limitations exclude the installation of conduit, and where channel separation is required in manholes. When physical limitations exist and/or channel separation in manholes is required, the power cables are run in tray or wireway. Power cable is contained in the following trays/wireways: 1CJQ10, 1CJR10, 1CJS10, 1PBM01, 1PJA01, 1PAM01, 1PAM02, 2PAM02, 3PAM01, 1PGS01, 1PGS02, and 1PGS03. Justification is as follows:

1CJQ10, 1CJR10, 1CJS10: The space available was insufficient to terminate all conduits destined for the various vertical stacks of MCCE11C. Short sections of tray, in lieu of cabinet extensions, were used to gather and deploy the cable to the appropriate stacks (see Subsection 8.3.1.2.18).

1PBM01, 1PJA01: Physical limitations that imposed restrictions on conduit bending radius and space limitations at the containment penetration terminal boxes prevented the installation of conduits at penetration terminal boxes P1P2MI and P1P2MX. Short sections of wireway were used to gather the cable and nest the cable to the penetrations. There is no separation conflict in this instance. 1PAM01, 1PAM02, 2PAM02, 3PAM01 (located in manhole 3001): Wireways were used to achieve channel separation, by use of a metal barrier, inside manhole 3001. Wireway was used in lieu of conduit because the need for channel separation was not apparent until after the cables were pulled. 1PGS01, 1PGS02, 1PGS03: The location of embedded conduit stub-outs with respect to the penetration terminal box, in conjunction with structural steel interferences, prevented the installation of conduit.

The embedded nonmetallic conduits are in concrete duct banks which are Seismic Class I structures. Class 1E cables of different essential channels are run in separate nonmetallic conduits encased within the duct bank and separation between these conduits is a minimum of 1-1/2 inches. 8.3.1.2.20 Routing of Class 1E Circuits The routing of Class 1E circuits has been reviewed for exposure to potential hazards such as high-pressure piping, missiles, flammable material, and flooding (see Chapter 3). All raceways are flame retardant. Trays carrying essential control and instrumentation cables are amply sized to preclude overfill. Control cable trays are filled to 60 percent of tray cross-sectional area or less except at tray cross fittings where the limit is 54 percent in the entering and exiting legs of the cross. The cable cross sectional area above the tray side rails is included with the cable cross-sectional area within the side rails in determining tray fill percentage. Instrumentation and control cable tray loading is permitted to the height of the side rails. At crosses, tees, and where large conduit spills into trays, the height of the fill may exceed the side rails height due to cable crossover. Where the intent of vertical cable tray separation criteria would be negated by cable

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-34 UFSAR Rev 32 9/2018

exceeding the tray rail heights, the inclusion of a thermal insulating material provides the required separation. In addition, all trays are ladder type with solid bottoms. Trays passing through fire walls, floors and ceilings are provided with fire stops. The minimum cross-sectional area of the cable tray cross fittings used is 90% of the combined cross-sectional area of the two (2) intersecting trays, and therefore, in order to maintain the 60% fill limitation within the cross fitting, limits the fill to 54% (90% of 60%) in the entering and exiting legs of the cross. In no instance is there any essential system tray cross fitting with entering or exiting legs having a cable fill in excess of 54%. The identified 54% fill limitation will be maintained for tray cross fittings’ legs on essential system trays. By not exceeding the 54% fill limit on each leg, recognizing that cables cannot terminate within a Tee, the exceeding of the 60% fill of the Tee is prevented. Separation between trays carrying redundant Class 1E circuits is usually accomplished by locating these trays in separate rooms. However, as defined in Section 5.1.4 of Regulatory Guide 1.75, in some general plant areas, defined as areas from which potential hazards such as missiles, external fire, and pipewhip have been excluded, open top trays carrying redundant Class 1E circuits are normally separated by a minimum of 4 feet vertically (bottom to bottom) and 18 inches horizontally. These minimum distances are considered adequate, since (1) the tray system is solid bottom rather than open ventilated, and (2) cable jackets have a self-extinguishing and non-propagating flame resistance characteristic as supported by certified test results. The cable spreading room and main control room do not contain high-energy equipment such as switchgear, power transformers (except a 30 KVA dry type lighting transformer in the cable spreading room), rotating equipment, or potential sources of missiles or pipe whip and will not be used for storing flammable material. Separation criteria for open top cable trays in the cable spreading room are the same as for the general plant areas discussed above (4 feet vertically and 18 inches horizontally). In both the general plant area and cable spreading room, where there are conditions of either convergence of trays carrying redundant Class 1E cables or crossings of trays carrying redundant Class 1E cables, where vertical or horizontal distance cannot be maintained, solid covers, flame retardant barriers, and/or thermal insulating materials are used. The locations of these installations in the cable spreading room are shown on Figures 8.3-35, 8.3-36, and 8.3-37. The minimum vertical separation distance of 4 feet between trays carrying redundant Class 1E cables does not exclude trays carrying non-Class 1E cables from being interposed between the trays carrying Class 1E cables. This arrangement can be justified since (1) the trays carrying non-Class 1E cables are also solid-bottom type and (2) the flame retardance of the non-Class 1E installed cable is the same as that of the Class 1E cable discussed previously with minor exceptions. The criteria are shown on Figure 8.3-38. Where such distances are not met, fire barriers are installed. The separation criteria between trays, wireways, and conduits are as shown on Figures 8.3-39 through 8.3-42. Enclosed tray, wireway, and conduit are equated insofar as these criteria. The fire barrier details associated with Figures 8.3-39 through 8.3-42 are shown on Figures 8.3-43, 8.3-44, and 8.3-45.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-35 UFSAR Rev 32 9/2018

The above minimum separation distances do not necessarily apply to embedded conduits carrying redundant Class 1E cables. However, they do apply at points where these embedded conduits leave the embedding material and the previously enclosed cables do not continue in exposed conduit. Thermal blankets (Kaowool or equivalent) will be provided in all open top trays with certain exceptions (e.g., trays inside containment and other selected areas). These exceptions will be documented on controlled documents. Design and control of the cable systems layout is in accordance with approved Design Control Procedures. Trays, wireways, and conduits carrying essential cables are clearly marked on all layout drawings, and each is reviewed and approved prior to being utilized in the field. Review has included consideration of failure of a non-seismically qualified equipment affecting both redundant channels of essential components and failure of a high energy line in the vicinity of Class 1E equipment to ensure the design criteria are not violated. During installation, electricians are responsible for installation of the equipment and cable systems in accordance with the issued drawings using approved procedures. After installation, the system is inspected in accordance with another approved procedure and the results recorded. Any deviations from issued drawings are documented and reviewed to ensure design intent is not violated. This information is then included on final, as-built drawings. Pulling and inspection of cable within the installed raceways is performed using similarly approved procedures and results of final inspection documented. 8.3.1.2.21 Electrical Conductors Class 1E electrical conductors except heat trace cables have insulating materials which resist heat, moisture, radiation, and ozone. Jackets are also applied over the insulations. These jackets make the cables self-extinguishing and prevent flames from spreading. Heat trace cables are not considered here, since they are used as heating elements for piping and instrumentation rather than as system interconnections. Ground wires may be bare or covered with an insulation or jacket material. Minor amounts of PVC Cables are routed in non-essential trays in the unit. Prototypes or actual production samples of each type construction have been tested to demonstrate that all cables will withstand the environmental conditions specified (see Table 8.3-4). Interconnections between cabinets of the SFAS are achieved by using the same single conductors as that used within the SFAS cabinets. This wiring is supplied as a part of the SFAS equipment. It is single conductor with one layer of an insulation/jacketing of polytetrafluoroethylene material which is compatible with the environmental service conditions. The wireways in which these SFAS interconnections are run are sealed with silicone foam for additional fire retardancy as necessary. 8.3.1.2.22 Base Ampacity Ratings of Cables Base ampacity ratings of cables are established as published in IPCEA P-46-426 and in accordance with the manufacturer’s standards. To this basic rating a grouping derating factor, also in accordance with IPCEA tables, is applied.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-36 UFSAR Rev 32 9/2018

Credit is taken for load diversity factors where applicable. Motor feeder power cables are selected on the basis of 100% load factor and continuously rated for 125% of the motor full load current. If exception is taken to this requirement then the basis shall be documented in an evaluation which demonstrates that the feeder cables are capable of carrying their design load under normal and emergency conditions of operation for their design life expectancy. Power and control cables for services required to operate for extended periods after a loss of coolant accident are suitable for operation under condition of high ambient temperature, radiation, pressure, and humidity prevailing after an accident. 8.3.1.2.23 AC Power Circuits All AC power circuits have circuit protection provided by either circuit breakers or fused disconnect switches. Fuses are also used on some AC power circuits for fault current backup protection. Thermal overload protective devices are not used to trip any safety-related motor operated valve. The tripping contacts on the overload protective device are not connected to the coils of the valve motor’s reversing starter. Many of the heaters in the overload protective devices have been replaced with shorting bars which prevent the overload device from sensing an overload condition. However, motor thermal overload devices are used to trip some safety and non-safety related motors for pumps, fans, dampers and drives. 8.3.1.2.24 Cables for Reactor Protection Systems Essential cables for reactor protection systems and safety features actuation system equipment are installed within Seismic Class I structures. The cable installation is Q (Nuclear Safety Related) and as such is subject to quality assurance procedures to ensure that the design criteria are met through all stages of design, procurement, and installation. 8.3.1.2.25 Redundant Class 1E Instruments Redundant Class 1E instruments are located in separate cabinets or in separate compartments of the same cabinet. When this is not feasible, physical separation of 12 inches is maintained between redundant essential channels or metal barriers and conduits, either rigid or flexible metal, are utilized for maintaining separation. The cabinets are located in plant areas which minimize potential hazards such as missiles, external fires, and pipe whip. Redundant Class 1E sensors and their connections to the process system have been sufficiently separated to ensure that the functional capability of the protection system has been maintained despite any single design basis event or result therefrom. Sensor to sensor separation is a minimum of three (3) feet. The main control board is located within a fire wall type control room in the Seismic Class I auxiliary building. The control room is protected from and does not contain high-energy equipment such as switchgear, power transformers, rotating equipment, or potential sources of missiles or pipe whip. The separation distance between redundant Class 1E equipment and circuits internal to the control board is a minimum of 12 inches. Barriers such as flexible or rigid metallic conduit are installed where separation distance is less than 12 inches. Wiring is flame retardant. Class 1E incoming cable and internal board wiring identification uses color coding as

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-37 UFSAR Rev 32 9/2018

discussed in Subsection 8.3.1.2.14. Where common devices accommodate redundant Class 1E circuits the minimum separation is met by use of barriers. Cable entrance to the main control board is through blockouts in the control room floor. Typically, each block out is dedicated to only one redundant Class 1E channel.

Instrument Cabinets

Blockouts for cable entrances beneath the Reactor Protection System and Safety Features Actuation System cabinets enclose cables for the various sub-logic matrices which are necessary to establish the two-out-of-four logic described in Subsection 7.3.1.1.2. All sensor input cables to the SFAS cabinets are enclosed in either rigid or flexible metallic conduit. Further, no single event which fails all cables passing through a particular block out can preclude proper operation of the Reactor Protection System or Safety Features Actuation System as appropriate (see Sections 7.2, 7.3 and Subsection 8.3.1.2.14). Some sensor-to-process connections of redundant sensors have a common section of line. This is justified since failure of this connection will cause the sensors to fail in the safe position. The locations of redundant Class 1E actuated equipment such as pump drive motors and valve operating motors have been reviewed to ensure the minimum required functional capability despite any single design basis event or result therefrom. The main control boards have the following fire stops and separation barriers:

a. All control room vertical panels shall have the cable runs in the base of the panels

enveloped with low density silicone foam up to a height level with the base of the panel.

b. All control room control consoles shall have the cable runs in the base of the

consoles enveloped with low density silicone foam up to the top of the cable tray in the base of the consoles.

c. All essential cable conduits in the base of the control room cabinets and consoles

shall be sealed with low density silicon foam, if the conduit end is in the base.

d. All essential cable runs in the base of the control room cabinets not in conduit shall have the cable runs coated with low density silicone foam up to the cable identification tag affixed to the cable or eight (8) inches above the base of the panel. This eight (8) inches provides the fire stops and cable separation for cable crossover between essential channels and between control panels.

e. Openings in fire barriers through which cables pass into the main control boards

are closed with fire rated seals equal to the rating of the barrier. If the cable is routed to the control boards in conduit, the conduit is sealed internally as required to maintain the fire barrier rating.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-38 UFSAR Rev 32 9/2018

f. Panel C5716 A horizontal barrier is installed to completely close the top of this vertical panel. The center barrier extends up to the additional horizontal barrier at the top of the panel. The center barrier is extended and completed down to the enveloped cable in the base of the panel. A vertical barrier is installed to complete the sides of this panel, and C5716 is isolated from C5715 and the void between C5716 and C5717. All joints in barriers and voids around cables penetrating the center barriers are sealed with silicone rubber.

g. Panel C5717

A horizontal barrier is installed to completely close the top of the vertical panel. Vertical barriers are installed to complete the sides of this panel, and C5717 is isolated from the void between C5717 and C5716. A readily removable barrier is installed to extend the center barrier to complete isolation between Channels 1 and 2.

h. Panel C5718

A horizontal barrier is installed to completely close the top of the vertical panel. A vertical barrier is installed to complete panel isolation at the bottom of the vertical panel between C5717 and C5716.

i. In Panels C5715, C5716, C5717, and C5718, smoke detectors are installed to

maintain fire detection now that these panels are completely isolated. j. Barriers required by the above are made from 1/2 – inch – thick Marinite. Barriers

to isolate C5717 and C5716 from the void between these panels may be installed within the void if more convenient than within the panels.

Within enclosures (control boards, instrument cabinets, distribution panels, motor control centers, etc.), non-Class 1E wiring may be routed, bundled, or formed with Class 1E wiring. The following specific criteria are used to guide the installation. Deviations from these criteria, as well as the other separation criteria, may occur. However, these deviations are documented and analyzed as a prerequisite for acceptance. The non-Class 1E with Class 1E criteria are:

a. When located in the same enclosure with essential cables, Channel A cables may

be bundled, routed, or formed with Channel 1 cables. Similarly, Channel B cables may be bundled, routed, or formed with Channel 2 cables.

b. In enclosures designated for Channel 3 use, Channel A cables stay be bundled,

routed, or formed with Channel 3 cables. Similarly, in enclosures designated for

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-39 UFSAR Rev 32 9/2018

Channel 4 use, Channel B cables may be bundled, routed, or formed with Channel 4 cables. However, in the specific case where Channel A is bundled, routed, or formed with Channel 3 (and conversely Channel B is bundled, routed, or formed with Channel 4), a verification is made that bridging does not exist. (Bridging occurs when a single nonessential cable or conductor is simultaneously routed, bundled, or formed with cables or conductors of two different essential channels.)

c. If an enclosure contains both Channels 1 and 3 cables, Channel A cables will

preferably be run with Channel 1 cables. Similarly, if an enclosure contains both Channel 2 and 4 cables, Channel B cables will preferably be run with Channel 2 cables. However, in the specific case where Channel A is bundled, routed, or formed with Channel 3 (and conversely Channel B is bundled, routed, or formed with Channel 4), a verification is made that bridging does not exist.

d. When located in the same enclosures with essential cables, Channel A cables will

not be bundled, routed, or formed with Channel 2 or 4 cables. Similarly, when located in the same enclosures with essential cables, Channel B cables will not be bundled, routed, or formed with Channel 1 or 3 cables.

e. Channel C cables will not be bundled, routed, or formed with any essential cables. f. Any single nonessential cable will not bridge two or more essential channels within

enclosures.

8.3.1.2.26 Cable Spreading Room All cables in the cable spreading room associated with essential channels are arranged so that redundant circuits for each of the individual systems are isolated either by physical separation or by fire barriers where physical separation cannot be maintained. 8.3.1.2.27 Circuit Schedules and Connection Diagrams Circuit schedules and connection diagrams have been prepared to give a permanent record of the routing and termination of all cables. 8.3.1.2.28 Q-List Items All electrical equipment classified as Q (Nuclear Safety Related) have been designed in accordance with the latest codes and standards as of the date of licensing of the plant to perform under the environmental conditions required. To ensure the proper design has been accomplished and that the equipment is subsequently fabricated and installed as specified, a detailed Quality Assurance/Quality Control program has been instituted and is described in further detail in Chapter 17. Each safety-related electrical purchase is covered by a procurement package which ensures that appropriate technical requirements and environmental conditions are applied during design of the equipment, includes any special quality control procedures to be followed by the manufacturer, and includes any required acceptance testing. The design development process is monitored so that all design additions/deletions changes are reviewed and approved prior to incorporation in the station. The manufacturing process is monitored by inspectors representing the Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group with the authority to reject any non-conforming material.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-40 UFSAR Rev 32 9/2018

The electrical installation contractor is responsible for the proper handling and installation of the electrical equipment after it arrives at jobsite. All work in relation to the receipt, handling, storage, installation, and testing of Safety Related items is performed in accordance with procedures that have been reviewed and approved by the Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group or its agents prior to use. Representatives of Davis-Besse Nuclear Power Station (DBNPS) Nuclear Group monitor all phases of this work ensuring the procedures are properly followed and have the responsibility for giving final approval prior to acceptance of a complete installation. Adequate records such as inspection and test reports are maintained to demonstrate the traceability of all Safety Related material from the time of manufacture to final installation. 8.3.1.2.29 Penetrations The electrical penetrations are designed and tested to meet IEEE Standard 317-1971. Conax penetration assemblies are designed and tested to meet IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2. Short-circuit tests were performed on two prototype penetrations, as required by the above-mentioned standards, to ensure that the penetration assemblies can withstand, without loss of mechanical integrity, the maximum possible fault current vs. time conditions. The two prototype penetrations tested were a medium-voltage penetration consisting of a unitized header 26 inches OD, 3 inches thick, with 6 modules, and a low-voltage penetration consisting of 3 x 350 kcmil in a single hole plate. The prototype penetrations withstood the following currents for the indicated times:

Start Asymmetric

RMS Amperes

Start Symmetric

RMS Amperes 3 Phase

1/4 Time Symmetric

RMS Amperes 3 Phase

Number of

Cycles Medium-voltage Penetration

70,000 (C phase) 44,700 33,700 26.5

Low-voltage Penetration 41,300 (B phase) 23,400 20,400 30.5

After completion of the short-circuit tests, a leak test was performed on each prototype penetration. The results of that test met the requirements of the above-mentioned standard. In addition, prior to the performance of the above-mentioned tests, each prototype penetration successfully passed radiation and environmental (LOCA) tests. The electrical system design provides both primary and backup fault protection for power circuits which are energized during plant operation and are routed through electrical penetrations. Should the primary protection fail to act, the backup will act in sufficient time to preclude thermal and mechanical damage to the penetration assembly under fault conditions.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-41 UFSAR Rev 32 9/2018

The basic philosophy of this type of protection is to provide selective tripping of circuit breakers in order to maintain maximum continuity of service by removing that section of the system where the fault has occurred. The primary protection is set to trip the breakers instantaneously under high-fault currents. In the event the primary protection or the corresponding breakers fail to act, the backup protection will respond to disconnect the affected circuit. During some high current faults the backup protection may act before or in unison with the primary protection. The tripping time of the backup protection has been set in such a way that it will trip faster with higher fault currents, i.e., it has inverse time characteristics. Diversity of 125V DC control voltage (for 13.8 kV buses A and B between source breakers and load breakers) is utilized to further assure that the backup breaker will trip if the load breaker fails due to a loss of control voltage. The short circuit studies performed for Davis-Besse Unit I determine the maximum symmetrical short circuit current which might flow through the 13.8kV electrical penetrations. This calculated short circuit current is lower than the tested value of the medium voltage penetrations. The calculated permissible tripping time for the fault current is based on a correlation of current and time using the relationship 2

221

21 tItI = . Under this fault condition the primary and secondary

protection will act to preclude the damage of the penetration. This protection is adequate for the medium voltage penetrations. Similarly, for the low voltage penetrations, the calculated maximum symmetrical short circuit current and the calculated permissible tripping time for this fault current has been determined. Under this fault current, the primary and secondary protection will act to preclude the damage of the penetration. Circuits with lower fault currents have been similarly evaluated. The above analysis establishes the adequacy of the primary and backup protection of the electrical penetrations. Electrical penetration assembly (EPA) terminal boxes, installed inside the containment structure are used to house the terminations of the electrical penetration assembly pigtails to their respective field cables. For circuits which are required to function in an accident environment the termination of the field cable/EPA pigtail combination is performed utilizing an environmentally qualified (Raychem) splice kit. During a postulated accident condition, these terminal boxes are subject to a pressure rise; imploding could result. To reduce the differential pressure across the terminal box, each box is fitted with a vent hole in the bottom, proportional to the size of the box. Since the cable splicing located internal to these boxes are environmentally qualified, the vent holes do not have an adverse effect on safety. The purpose of the electrical penetration assemblies (EPAs) is to provide continuity of electrical circuits through the containment structure, while maintaining the integrity of the containment pressure boundary. The electrical penetration assemblies consist of Conax and Amphenol modules in a header plate. A nitrogen supply system is connected to the EPAs to monitor the leak integrity of the penetration assemblies. The nitrogen supply system consists of two separate trains, one in the west auxiliary building (electrical penetration Room 1 [Room 402]) and the other in the east auxiliary building (electrical penetration Room 2 [Room 427]). The nitrogen gas cylinders are permanently connected to the electrical penetration assemblies’ header tubing to provide a continuous pressurization to a value recommended by both Amphenol and Conax and greater

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-42 UFSAR Rev 32 9/2018

than containment pressure. The nitrogen pressure is checked periodically and the cylinders replaced as necessary to maintain the recommended nitrogen pressure. The dry nitrogen serves the following functions:

a. Maintain the penetration dry during both normal and LOCA conditions. b. Prevent leakage from the Containment Vessel interior to the environment. c. Monitor EPA integrity. A high nitrogen consumption would indicate that an EPA

might be leaking. The following exception is taken to Regulatory Guide 1.63 :

a. IEEE 317-1971 is used instead of IEEE 317-1972. The Conax penetration

assemblies meet the requirements of IEEE 317-1976 as modified by NRC Regulatory Guide 1.63, Revision 2.

The only redundant circuits which are routed through the same penetration room are the power supplies and the space heater supplies to the containment cooler fans numbers 2 and 3 in room 427. The separation of 9 feet will preserve the integrity of the redundant circuits. 8.3.1.2.30 Cable for Class 1E Service Each manhole (i.e., 3001 , 3004, 3005, 3006, 3020, 3041, and 3042) that accommodates cable for Class 1E service is provided with a sump and a sump pump. In addition, essential cable is suitable for direct burial service. The insulation resistance of essential power leads passing through manholes will be tested per station procedures as part of the motor and equipment maintenance program on a periodic basis to assure cable insulation integrity over the design life of the station. 8.3.2 DC Power System 8.3.2.1 Description The station DC equipment consists of two 250/125V DC motor control centers, four batteries, six battery chargers, four essential distribution panels, four 480V AC/125V DC rectifiers, and four nonessential distribution panels. The system is designed to provide a continuous, reliable, and redundant 250/125V DC power source for control, instrumentation and DC loads required for normal operation and orderly shutdown and control of the station. The system is arranged to form two completely independent load groups as shown in Figure 8.3-25. The DC equipment is classified as Class 1E except nonessential distribution panels. 8.3.2.1.1 DC Motor Control Centers Two redundant 250/125V DC motor control centers are provided. Each motor control center has a positive, a negative, and a neutral bus arranged to form a 250/125V DC system. Each

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-43 UFSAR Rev 32 9/2018

live bus is connected to a corresponding 125 volt battery, a normal battery charger source, and a manual standby battery charger as indicated in Figures 8.3-46 and 8.3-47. The standby charger is connected to the bus through a normally open manual switch. In the event of AC power failure, the motor control center will be supplied from its respective batteries without any interruption of power. Each of the two motor control centers supplies two 125V DC essential distribution panels, five 250V DC oil pump motors, two 250/125V DC emergency lighting feeders and one 250V DC/120V AC nonessential inverter. DC motor control center 1 also supplies power to the motor operations of the auxiliary feed pump discharge stop valve to steam generator 1 (MV3870), the auxiliary feed pump turbine 1 main steam isolation valve (MV106) and the DC lube oil pump motor for the high-pressure injection pump 1-1 (MP197-2). DC motor control center 2 also supplies power to the DC lube oil pump motor for the high pressure injection pump 1-2 (MP198-2). 8.3 .2.1.2 Station Batteries Four 125V DC approximately 1500 ampere-hour, on eight hours discharge basis, lead-sold batteries are provided and arranged to form two independent 250/125V DC systems. Using 1.75 volts per cell as the minimum cell voltage each battery has the following capacity:

Amperes Rating Discharge Time 187 8 hours 750 1 hour 1400 1 min

Each battery is maintained in a fully charged condition and is normally float charged at approximately 132 volts from its associated battery charger. Battery discharge will occur either when the DC requirements temporarily exceed the charger capacity or during a loss of a battery charger supply. Each battery is connected to one 125V DC bus of one of the two DC motor control centers as shown in Figure 8.3-25.

Design Bases

The station batteries are sized to supply the station DC and instrument AC loads for a period of one hour without AC power availability. Manual shedding of some loads is required within 30 minutes of a loss of AC power to maintain adequate voltage at all required DC loads. An age factor of at least 1.25 is applied in the station battery sizing analysis to ensure that the batteries will supply the required loads when battery capacity decreases to 80 percent of the manufacturer’s rating. The loads on each battery are as follows: Station battery 1P supplies the loads of essential 125V DC distribution panel D1P, motor operated stop valve for Auxiliary Feed Pump 1-1 discharge to Steam Generator 1-1 (MV3870), and the lube oil pump for the HPI Pump 1-1 (MP197-2). Station battery 1N supplies the loads of essential distribution panel D1N and motor operated isolation valve for Main Steam Line 1 to Auxiliary Feed Pump Turbine 1-1 (MV106). Also batteries 1P and 1N feed the 250V DC MCC1 loads.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-44 UFSAR Rev 32 9/2018

Similarly, station battery 2P supplies the lube oil pump for the HPI pump 1-2 (MP198-2) and essential distribution panel D2P. Station battery 2N supplies essential distribution panel D2N. Also, station batteries 2P and 2N feed the 250V DC MCC2. The battery loads, operating requirements, and load shedding requirements during the worst case accident with no AC power available for battery chargers are detailed in the DC System Analysis. The DC load list (contained in the DC System Analysis) establishes the one-hour duty cycle for each battery. The battery with the largest load was used in sizing the capacity and ampere rating of all four batteries. The first minute of the duty cycle includes the momentary loads and non-continuous loads that may occur at random during the one hour duty cycle. It also includes the continuous loads carried by the battery immediately following a design basis event coupled with a loss of ac power to the battery chargers. The first minute loads include the starting current for certain dc motors, the dc load current associated with operation of 13.8kV, 4.16kV, and 480V breakers, and the starting and field flashing of the emergency diesel generators. The plate requirement which satisfies the above load cycle is a battery with ten positive plates and with performance characteristics equal to or better than a GNB model NCX-21. 8.3.2.1.3 Battery Chargers Six static solid state battery chargers are provided. Each is rated at 480V AC, 3 phase, 60 Hertz input and has a nominal output of 125V DC. Each charger is capable of supplying all steady-state DC loads required under any condition of operation while recharging the battery to a fully charged condition over a period of 12 hours from the maximum discharge condition established in the DC System Analysis. Technical Specification surveillance testing assures that each charger is capable of delivering the necessary current and voltage for an extended period of time to demonstrate this design capability. The six chargers are arranged into two groups. Each group consists of three chargers, two of which are supplied from one essential 480V AC motor control center and constitute the normal DC supply to both live buses of the corresponding DC motor control center. The third charger is provided as a standby source and is supplied from a separate 480V AC bus on the same essential channel. The third charger can be manually switched to supply either live bus on the given DC motor control center. Each charger has a circuit breaker in its AC power incoming feeder and a fused disconnect switch in DC power output circuit for isolating the charger. 8.3.2.1.4 Essential 125V DC Panels Four redundant 125V DC panels are provided, as a part of essential power systems, to supply 125V DC power to safety-related loads. The four panels are designated D1P, D2P, D1N, and D2N, and supply DC loads as follows:

a. Essential DC panel D1P (Channel 1) supplies:

1. Essential safety features actuation system solenoid valves (Channel 1) 2. 480 Volt essential unit substation Bus E1 3. 4.16kV essential switchgear Bus C1

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-45 UFSAR Rev 32 9/2018

4. 120V AC essential inverter YV1 through a coupling diode 5. Emergency diesel generator 1-1 6. Nonessential DC panel DAP 7. Radiation sampling system solenoid valves 8. Relay cabinets for: 120/240 VAC System: Reactor Coolant Pump: and

SFRCS 9. Auxiliary Feedwater Pump Turbine 1-1 control circuits 10. Component Cooling Water Pump and Emergency Ventilation System flow

indicators 11. Control Rod Drive shunt trip breaker B 12. 4160 Volt essential transfer switchgear CD

b. Essential DC panel D2P (Channel 2) supplies:

1. Essential safety features actuation system solenoid valves (Channel 2) 2. 480 Volt essential unit substation Bus F1 3. 4160 Volt essential switchgear Bus D1 4. 120V AC essential inverter YV2 through a coupling diode 5. Emergency diesel generator 1-2 6. Nonessential DC panel DBP 7. Radiation sampling system solenoid valves CH-2 8. Relay cabinets for: 120/240 VAC; Reactor Coolant System; Reactor Coolant

Pump; SFRCS 9. Auxiliary Feedwater Pump Turbine 1-2 control circuits 10. Component Cooling Water and Emergency Ventilation System flow indicators 11. Control Rod Drive shunt trip breaker A 12. Motor Driven Feedwater Pump control valve position controller 13. 4160 Volt essential transfer switchgear CD

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-46 UFSAR Rev 32 9/2018

c. Essential DC panel D1N (Channel 3) supplies:

1. 480 Volt essential unit substation Bus E1 (alternate source) 2. 4.16kV essential switchgear C1 (alternate source) 3. 120V AC essential inverter YV3 through a coupling diode 4. Emergency diesel generator 1-1 (alternate source) 5. Nonessential panel DAN 6. Reactor Coolant Pump relay cabinet 7. Motor Driven Feedwater Pump control valve position controller 8. Control Rod Drive shunt trip breaker D

d. Essential DC panel D2N (Channel 4) supplies:

1. 480 Volt essential unit substation Bus F1 (alternate source) 2. 4.16kV essential switchgear D1 (alternate source) 3. 120V AC essential inverter YV4 through a coupling diode 4. Emergency diesel generator 1-2 (alternate source) 5. Nonessential DC panel DBN 6. Reactor Coolant System and Reactor Coolant Pump relay cabinets 7. RC2A PROV solenoid 8. Control Rod Drive shunt trip breaker C

Each essential panel is fed normally from one DC motor control center with a manually switched reserve supply from the second DC motor control center as shown in Figure 8.3-25. Four 125V DC nonessential panels are provided. Each supplies DC loads as indicated on Figure 8.3-25. 8.3.2.1.5 Rectifiers Four rectifiers are provided to supply normal DC power to the four essential inverters. Each rectifier output is connected in parallel with the DC panel reserve supply to the inverter and is rated at 480V AC, 3-phase, 60 Hertz input, 125V DC nominal output. The output voltage is maintained at least 3 volts higher than the station battery voltage, which reverse-biases a coupling diode to prevent current flow from the reserve supply, and to prevent back-feeding the DC system. The failure of the rectifier Ac source and/or of the rectifier itself will forward bias the coupling diode, and cause the battery and/or battery charger to become the DC source to the essential inverter with no power interruption.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-47 UFSAR Rev 32 9/2018

Channel 1 and 3 rectifiers are fed from a Channel 1 essential 480V AC motor control center, while Channel 2 and 4 rectifiers are fed from a Channel 2 essential 480V AC motor control center. 8.3.2.1.6 Monitoring and Surveillance Instrumentation, relays and indicators are provided locally and at the main control board to monitor the status of the DC system equipment. The locally mounted instruments are:

a. On each motor control center:

1. DELETED 2. Two 125V DC ammeters 800-0-800 ampere each to read battery current flow. 3. Two DC voltmeters — relays each connected to a separate bus and set to

alarm in the control room at an under-voltage or an overvoltage. 4. One ground detector to alarm in case any of the three buses is grounded. 5. Two directional current relays with time delay to alarm battery discharge.

b. On each battery charger:

1. One under-voltage relay on the input side set to alarm when battery charger input voltage drops below the design capability of the battery chargers. 2. One under-voltage alarm relay on the output side. 3. One DC ammeter. 4. One DC voltmeter. 5. One Over Temperature alarm relay. 6. One Fan Failure alarm relay. 7. One Charger Failure alarm relay.

c. On each 125V DC essential panel:

1. One under voltage alarm relay. 2. One indicating light, indicating low voltage DC.

The main control board mounted instruments are:

a. Four DC ammeters 800-0-800 amperes indicating each battery output current.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-48 UFSAR Rev 32 9/2018

b. Two DC voltmeters 0-300V each to measure motor control center bus voltage. c. Four DC voltmeters 0-150V one for each essential 125V DC panel. d. Eight indicating lights, two for each essential 125V DC panel; one indicates the

status of the normal feed switches, and the second indicates the status of the alternate feed switches.

e. Four indicating lights; each indicates the status of the DC motor control center

disconnect switches associated with the standby battery chargers. f. Four indicating lights; each indicates the status of the feed switch from each

essential 125V DC panel to the respective essential inverter. 8.3.2.1.7 Physical Arrangement of DC Electrical System Components DC distribution system components are arranged and located in areas to minimize their vulnerability to physical damage as a result of accidents. Battery chargers as well as the other listed equipment (below) for the Class 1E batteries are located in separate fire wall type rooms adjacent to their associated batteries. Low voltage Switchgear Room 428 contains the following:

a. DC motor control center 2 b. Battery chargers DBC2P, DBC2N, and DBC2PN c. Essential distribution panels D2P (Channel 2) d. Distribution panels DBP and DBN

Low voltage Supply Room 428B contains essential distribution panel D2N (Channel 4) Low voltage Switchgear Room 429 contains the following:

a. DC motor control center 1 b. Battery chargers DBC1P, DBC1N, and DBC1PN c. Essential distribution panel D1P (Channel 1) d. Distribution panels DAN an DAP

Low Voltage Supply Room 429A contains essential distribution panel D1N (Channel 3). Low Voltage Battery Room 429B contains 125 volt batteries 1P and 1N, and Room 428A contains batteries 2P and 2N. In each room the two 125 volt batteries are mounted on two racks separated by an aisle approximately 5 feet wide. The Class 1E batteries are located in separate battery rooms in the Seismic Class I auxiliary building. Each battery room has fire walls and is served by an independent Class 1E ventilation

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-49 UFSAR Rev 32 9/2018

system. Air flow alarm is provided in the Control Room to assure that hydrogen buildup is prevented in the battery rooms. 8.3.2.1.8 (TEXT DELETED HERE AND PLACED IN 8.2.1.3) 8.3.2.1.9 Tests and Inspection The ungrounded DC system has detectors to indicate when there is a ground existing on any portion of the system. A ground on one portion of the DC system will not cause any equipment to malfunction. Grounds will be located by logical isolation of individual circuits connected to the faulted system while taking the necessary precautions to maintain the integrity of the essential bus supplies. The station batteries are under continuous automatic charging and will be inspected and checked on a routine basis while the unit is in service according to the surveillance requirements of Technical Specifications. 8.3.2.1.10 Administratively Controlled Devices Administratively controlled circuit opening devices are listed in Table 8.3-3 by device number, type and location. 8.3.2.2 Analysis Analysis of the station DC system described in Subsection 8.3.2.1 is given in the following subsections. 8.3.2.2.1 DC System The DC system provides continuous DC power source to essential instrument, safety features systems, and necessary control systems regardless of auxiliary electrical system conditions. The system is designed to permit periodic testing of individual components as well as the system as a whole during station operation. 8.3.2.2.2 Reliability The reliability of the system is increased by providing redundancy of equipment and circuits. 8.3.2.2.3 250V DC System The 250V DC system consists of two independent load groups. A failure in one group will not affect the other. 8.3.2.2.4 125V DC Control Panel Boards Four separate 125V DC control panel boards are provided. Each panel is supplied by redundant feeders from both 250/125V DC buses through manual throw-over switches to prevent any DC panel from being supplied from more than one battery at a time. These DC panels provide DC instrument and control power as necessary for proper functioning of the unit.

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-50 UFSAR Rev 32 9/2018

8.3.2.2.5 Station DC System The station DC system is arranged so that a single fault within the system will not prevent the reactor protective system, engineered safety feature control system, and the engineered safety features from performing their safety functions. The batteries are mounted on Seismic Class I racks, installed in separate rooms within a Seismic Class I structure, and separated by fire walls to minimize the possibility of simultaneous damage to both batteries. 8.3.2.2.6 Battery Chargers The battery chargers are designed to prevent the AC source from becoming a load on the battery due to a power feedback as a result of the loss of AC power to the chargers. This preserves the battery. 8.3.2.2.7 Design Criteria for Cables and Raceway The design criteria for cables and raceways routing, loading, sizing. and marking are identical to those described under Subsection 8.3.1.2. 8.3.2.2.8 Redundancy in DC Control Power Redundancy is maintained in the DC control power supply to the 13800, 4160, 480 volt AC systems by providing two DC control feeders for each separate bus or appropriate group of circuit breakers. Each feeder is supplied from a separate 125V DC battery. 8.3.2.2.9 (TEXT DELETED HERE AND PLACED IN 8.2.1.4) 8.3.2.2.10 Quality Assurance Procedure A quality assurance procedure identical to that described under AC system (Subsection 8.3.1.2) ensures that the design criteria through all stages of design, procurement and installation are met. 8.3.2.2.11 Drawings Section 1.6 provides a cross reference between USAR figures and electrical control drawings.

8US BKR EOUlPI'EI{T OESCEIPIIOTI L0^0 XY AII LOADkvtr ATI LOAD

I'AM'ALLOADI hGSIEF V EE['AR(S

LOOP OTILT

frllI r0l0SIEP I.$Ef,otE r r

STEF I o sItP I I SIEP III STIP lv LOOPl L(xf,z(sEE NOTI

?1tr.00P5 riI{,AL LOAOINO LUE DEO TMffi f EtorE &r(sE Mlt 6r REltlFt(s

HF/kVl{160V stq 400 90 ?at, l0 t 61. EO ffi ft 0f, 0x s N 0r ff

O€CAY HETI PUF I

80s El BEI r tr.2 ?9. ?5

{tov_lf,c€r BCEl

'rfE c!r-r cGE L6s, xorE 21 cf1 -1 cL ff ol 0i

fiHP r Slrcl HY FtX i6i

FCft Fr rot xYlc lso I v ?

rtxt vlc RFI taF ilY

BEI?Z?

sEt 2f,f

NOTES1. l0lo5 tf,otctTED til SIEF I ARE THOSE TXAT STrrl 45 sffit5 IHE EErcETCI OIE5EI OENERATON I EOC

' BREEER Effi'.

rHEsE 10 05 cilstsr F xmratLl oFERArtxG m tlr€illrErTLooS ffor sHEo By Uv stcNrL oR t0405 rHlr ErtE asF^S SIGHAL TW SE SI BLOCIEO gI THE SEfr€ffif,.

?. lF a PUF rrs n!ffuxc oN rHls rniJx PRlffi ro ro55 GS''ITE POER (LWI II TILL BT SEO AI UV FELITS ISSTTFI 81 l]E OEIAT trLAY 2.5 SEEMS I'I€P IAI AFIEft7H€ EDC ilTPUT BiE^XER CTOSE'. { fuF IILT ET TiIPP€DAUTOSrtCttt IN sTfP I rHEt 0X ruF t5 STAST€0 AY StrSfo(rortrc i tmF.

I, STING CHARGER I' IOI HMTALTY Iff s!AYICE. II CIH EETACEO IX SRVICE XHILII IF tP H IN IS flOT AVAILIBLE.MiE 6TIER' ffiR $FEILIIIfl TEsTING. ALL IgIEEurtdti cffiG r1t.1P,tPf,- Ts ffittf,c ar THETFSrE$r-Srrrt E ffi rr trs r[sftE toror ARE Iil sEFvlcEHlm IO rE ff,ll tLW 0B tOP rlwl 'Ltrt,l. IHE 100Y^LUE ruffiB lE giM ffif effi[ [r sERvlctxll.fl[trBrtqrr-

h CrE.g5.O@. lli{ffir t" *tTr&l!tsE! ErdinlNuus ilarl& t1{-t s[ m oFEFATtNc tolDEmrlc [Br] 9il W ffirr*uffs SrtaDr-srrrE LoE0F W Sllmli C*ffi" *E {fl dfto xvr Af,E GTICULATEoErStD rPW K ffif,Iro LorUJd.,

5, DELETEO

0, tHt cfflrtuEilr HtmmE[ otlul0H StsrEt rcHor ts

rHcltor r t5 r ilcxuP ro rHE cHD srsrff, lI RTNIF€0.IiE SYSIEX tS HAruALLT LOAOEO Oil TO EOCT 'I APMOXIUIELY

O. OUEITC I LOCA. SXE.UP PUF! AFE WELID AI TUI.frT{560 SPI. THESE PUFS TE TI LOEF OUIPUI OURIIG T LOOPottY tvE|r. T8E tEcoD L0A0 vALqE tx EACH coL!*REPRESEf,IS IHt LW LOADIrc tr Ih€ PUPs.Fgn rmA4ffi IHE 10105 LlsrEo lssuE A LTFGE Locr.FOF A LfCE LMT ftE ESSEXIII PEESSUEIZEE HETTERSIILL f,OI REHAIil ET€HCI:ED. S(I Tffi VTRT 5fr1LOCAS YILL HEITEAS FEIA]il EXERC!Z€O. IN SIEH CAEEOIER TMCEF IOTOS SCH AS CIf,T SBAI PUFS YILLrcT BE PRESETI.

!. THE ITCXITUOES tr IHE LOADS FEO FROX BUSSESc? rxo De rE FRovloEo a5 tiFoRH Tloil ToIHE trERA]OE IH IHE EVENI IHAI TH€t IRfucraEo. *F0RE IHESE L0r0s crr EE lD0E0.HO{WEI IHE OPEFAIM ruST YEEIF1 IffTI

'HEIF[Dtrtff rtLL xor oEaloro rHE E06.

la. DUEIrc EOC trEffAIIOT, HCE T8E JACiEIrlrEi ltftilruRE EElcHtt l5!'4, rH€ EffiIETSIM HE IEiS IILL EEEF6IZE.

15. COHIAINEf,I T IilI]TG IRNS'frEF5 ME rcT JrcTUMOIX I{E TOIAL LOAO OE€IU5E IHE1 & REOUIRED TO EDEEiERGIZED OURI[G CTIT CLOSEflT.

rfERE ts rmMLLy oey ffE ftuilHiC C#of,€tT C00tt[6,AIER ICCII PUP. WILE SYFPIIC IHE RUf,NIrc IP 5F&PUFs. TW CCI ryS ARE IEPORAFITI RUf,f,Irc OI IHESTE rus, AXD IMO EX IH M I[ BUs IF IHE EOG YAS6!lirE0, rHl: TBLE lccouf,rs Fffi oNLr qE ccr PUFOECAUST PMCEOURES OIRTCI IH€ fENAIORS IO LITIT ITErmff' f IIf, THII IM CCI PUPS AFE CffNECIEO TO IHErrlt tus 00E t0 EDc Lol0lrc corcEnils.

I', OEL€TEO

20, PO!5 lf,D Potlf Clr 8E OFERrrto tN FLrCE OF pmlrrs p0a!1. RtgP€crtvEtr. rH€ poo]r lxD malr PupSAM $TECTEO AS ftUffTIHC 8[CTUsE TflET FESPFESEII TMmsr cfrsERvlTII LolD.

2I, TNA$OREN CGE LOSSES TEE TISIED il IiE T ELE FGPURPOSE # REPPTSEf,TIBC IOII OIESEL OEffiBIIOT LOAD.IHE IOEilTtFICAIIff NMEfts LISIED Uf,DEF TtT'M 1OD'FO8 IEAHSFOREB Cffi LOSSES A8E FICTIIIflS AS DO MIETISI IH IHE PLilT ffi If, Sf.

??. 1W rc$Srsrs tr rHE LOIOS rHAl rRt IDDEo l0 IHEEOC WET THE EOG il?h'T EREAIEi CTOTES TilLfiI[G ILOOP EEilT.

?!. IF I[ RUgIrc G' PU* IT3 Of, THtg IFAII PiIS TO IHILOOF.ffLi EYEhI. II TILL EESITRI ffiE[ IHE EOG OU'FUTBEfi€R CLOSTS ILOP 1 I. IF IIE ru PUP IA5 PUf,iITC ilTHIS IAAIH P8IO8 IO THE LOOF.MT TVENI. II IILL 8E SHIOEt uv ftLrrs rf,o srrEr 2.! sEcoEs IiTEF rHE EoG @rrurmEr.EE CrOStS.

24. a00P 2'ftcuFs Ttt it0, 5tc0il0s AFrEE TiE EDG ourPorgiEfiEn cL05E5. tr rHE acy PUp ls$cl^rEo vlrH rHtsTAltt t5 lx sTAiloB, mtoa ro IHE LooP-flLt EvEilL]I IILL STANT OUHIilC LMF ?,TXE Erc ltB C0FFE55m rt rlLr Srrtl 20 StCoXDt SlEftrHE Effi OTFUT gffriEF CLoSES FALortrc r tmP tVEXT.

25. 100P 3. fiCUES tEHry-frE rlr r SECOXoS IFrER r8t E00OUIPUT BEEATER CLOSES. THE 5I PUP sIAFTs IH L@P I.

?6. TME.UP PUp XOIOF fr 15 ourttrr CtA55 O Fffi EHER@{CiFEED

^XO SL(EO CO(Irc. IflE SCEHABIO IS ilISID' IH€

00un0s s FoRHAL oEsrcx EA5t5 EWHTS OESCfitgED til T*ursrt: HOEYEI. txE DPhoFFlllE OulLlrr CLl55 l!rxtrrtc&Lr c06t0Effi0.

GENERAL NOTE

5UFrcATIAG MCUEtrIAlIOil Fffi LOAO 5EruErcINC TIO ffrcFfDErERHlMrtfr, 15 EtL lS rm toAo vaLUE!. ts orcuEtrrEoti clLcutlrtol f-EE-0!5.m]-w. DtSnArEo l0lo v&uts F8rcrms IEE ctLcuLlIED il r{ cilstoEEllfl r0 rcTffiEFTICIEXCY qO PMF .TC'OE 8Y EITP POETSIIIIff. IHESUMF]IEO IOIIT LO O OI TiE EEfiOETCY O:EsTT 6EEf,TIFrsE$ lH To rccourt sysTEH L6sEs, lftclu0ls {(v lxD {eoYPtrE CA6LE L65ES AiO IE XOI DERIEO FFOX TflE AMITIq* iIL@ATIS ND XILOYAES Iil IHE EflUHS LISIEO.

REFERENCE DRAWI NGS

E-! 1.t6rV ilE LtrE ouGRrXE-{ 5H,l

E.5 sH, z

E-9 2{O VaC ^m

t?0 vrc rccs rEsslotE LtH€ Du6ftlx

E-1IE sFrs rcrtvrTED filtrutT raguLAU0N

DAVIS-BESSE NUCLIAR POlllER STATION

EMERGEI\lCY DIESIL GENTRATOR I-ILOADINC TABLT

E-1042 SH,lTABLE 8.3- I

PAGE 8, J-5I

REVISION 32

SEPIEMBER 201B

DS 0J'29-I$ DFlt=I ;/Ettc/tI0425Hl.D0tl

ns ui EffllP*rrll OCStRIFtl Ul Loro tr ltr rolDTYIR IIr Lolo

Srtp Itlittlolt I r$tEP lo IffilTL

LorDllliTTEP I I II 3ItF rr t,EP V mIlRrs

LMP il.I

Rfrrai9tlalr lm

l+/lrYl t{t{Y EC

Er2A 8Et ? 55 EICF O.C. EfiT' I YEXI Fllr I 0 ,t0?51 t.50 tco t. sl t. l? 0tr ofl Or (r{ ofl fia I o{ oir ff oil on

r.50 s t.6? 5. JIPO6l I

FUEL OIL Efi'sIEi FUF I F tll sor C'

o,00 or o{ ol il fi qo. oo ol

I 00 o.to .o{ il

EOo r-r rG ruRBo olL plrlf rf,at-I 0' tt il H 0t/ O. (,rffil3El Otr Pm Hfls qlp t.t pFl

z. !{ B' ora 0r Oil 0lr

Lr. PUI? STFltrCr toar f,i fla

3.E6 ().l f,lsEtrt! 0.00

5t r0 ,tlllrt trhusTuff tY ft?t2tiY r0 clxg tvt t+, YLY Httt

Er zo or or il OH

0,fiIAEX UP SENVICE YITEF E'BTITGF OISX YLY 0 0.oo 0,oo

E€r z!r8EEt 291 (cct Foffi tos cmLER Fff 5 oa

o.6f r(E l.a,tf, Pt# l-t Dl30t vLv

EI 2E t[,r zti fllct PaEESUAE tX. ff l rti iEglicLlXf, 150 vrv

rll,xFJe 0. ro o.m o.m

o, t6 or ilf 'rg

coltaitrfEtr llF oootEF Fr{ r - Hs

il

FE7{.r 0.t Io0 o.rt 0.40

xYlc F6ft fiool.s trt I {3{H ox 0f

ct 6l ox .I. ilt 0l. ffi il

o. {0 ffi

{,51 z.aa ox oa G

EFIzU fi{ oa 0t

o.o0 SFTICo.m

0t{

a,rao 1a. rt It'lt

TUt txt Ll*lE orl LrFf Ptr r

otra.tr

I

r ,tt

FII

0.00

I'GI H tt,00 H rt.E O,E rtEE xOlE ra, dr (SE€ xqft 1{rF|JEL olL ?ilr ft. Urt I rtfi

OI0, oo

rlt c0rftc5g6

git ItE 0.mI'EIIEL GEX TU@O LUE OII. FIJF lPAl T o'?5 o. T? o,5gf IIEL ffi.UCT FUF llitxt | .00

7tl--itr'-'

Erar 04

IITT-ETrt2 Yetor IffiIA d.3l ts o, !t o.al il fi{ fla 0t oil ota

YE2 rEr@plor tgt ErtI rti qwl[t E ]rlrl lI at vl Y rff3or t 8 o.5l r00 O,J! 0. {l oar 0l{ Or or ot or

fEt rEt0t cTrI fl8 ailtttrEB 5lnE tItE .tr.t'tot i c o.3l ro0 o.ll 0. {r ff il il il ol oaa

0. rt lo0 o.tl 0lr 0i

VE? rE2tEC TIIEF R'P ROOI VEIT FIi Mfl m{{fE 6.tr loo o.tt 0, rl 0lr 0ll oil of, H !f, oa il ot B ox 0r

YEA TEAN IFN YEzO LOTO TEzS 1.00 Ha oo 50 .20 ofl qt oil ofl 0i 0lr oa C ot ox 0t oa

.I|IIT.IIIIIilfl, fiilw ttfrf Gilrlnq,tlrtl,cl urtirt llcr rtt I rlx q,l c ra

DAVIS.BESSE NUCLEAR POHER STATIOt-l

Ei'{EROENCY DITSEL GEl'lERATOR I-ILOADING IABLE

E- I 042 SH.2IABLE 8. J- I

PAGE 8. ]-52

REVISION 32

SEPIEI,IBER 2OI8

0B 1 l -70- lI Lflt.l :/tlE[/il0425n?.06H

BU5 BTR E(ruIPXENI DESCFIPTIO{ ), Loro [I AIr LOAT)

kYtr /1Tr LOAD

STEP I. t€t

IOIE I r

SIEP I o T$.U&r.oat llrcSIEP I I SIEP III SITP IY SIEF Y REI.ARf,S

L00P ol{.YlfitE r.01tr

2llr00P2

ISEE I{OTE24t

LOOPSISEE NOTT

251IilrAL rorDllrc LOTDS TDfiD ITI.trJgrcr FEEDilG irl

rsf,E rrolE ir REL RTSHF /t(Yl T

{q9! !!98DI ADI13 i,P04 32 400 ?85. l0 1 81. €O ON ON ON ON OH ON ON ON ON OH 0fl OH

0l tDl 08 rfo43J {00 0 0.00 0.00 NOTE 20

561 2rl,8 ON ON ON ON frDI notla OECAY HEAI PUXP ? r7r.l0 ON OH ON 0{DI A0! 07 SERV]CE UATEP PUHP 2 ON ON oil 0tr OH

DI ADl 09 SERV]CE UATER PUUP 3 pooil NOTE 20 5PARE

01 a01 05 XAf,E-UP PUUP 2 t!+3 724 ON SEE NOIE I€ ANO NOTE 10 ON ON ON 0tr ISEI NOTE 2)o? nD2l o xP2{r 0 800 98 620. r 0 ON

AgND2 IEANSF 80 coRE Loss, NorE ?l BOCL 11.? kYl 0 0.00 OH

480V LC

BUS F] 8F111 COHTAINI,,IEHT SPRAY PUMP 2 0 po562 200 1 ?5.5 65.48 ON ON

FtrFR. INqTP. AIR COMRFSSOR IISq trr lqo ?oo 100 I 56, f,6 80,97 OH

r00 L95 l .21

rRnxsF- nFt coRF lossFs. NolF 7t D'ICI ?6.00 wa 100 3.70 ?5,144a0v mc

FI BOF! I xFrR oFr-r coRE Loss, NoI€ 2r oFt -l cL oo ?.00 | 2.84 ON 0s ON ON ON 0tr OH ON 0t{ ON 0tr ON

FI BOFI 2 rrMR oFr -2 coEE 1055, NOrE 2r oil ON ON ON 0f, ON ON 0t{ ON 0h ON

rttt BFttt5 COHTIINI'ENT LT6, TRANSF(L?SO] I x1301 o,00 0, 00 sEE NOIE 1 6 (sEE trOIE 16)

FttA 8Fll15 COilTIINHENT LTG. TFINSF(LISD2' x?902 10.00 hvt 0 SEE hOIE I 6 ( sEE a{oIE r 6 )

BF1t12 CC PUHP ROOH VENT. FAN ? r{co7 52 ?.50 00 ON OH ON

EFt114 CONIAINHENT LIG. TRANSF ( L4901 ) x{9Dl {5.00 kvt o 0.00 (5EE HOTE I5)COiITROL ROOT A AUX.ELOC.LTG.TRAHSF, x5?Dt 30.00 wr 98 25.16 1 ?.82 0t{ 0ir 0tr

COilTROL ROOf, ETER.VENI.5YSIEH FAH ? ffiozt 2 5 too (. 2. 3. 2{ 0tr 0tr

r'ic055e 50 99 {r ,62 ?J,89i65121 r0 r00 r 5,5e 1l,Jl OH

t.{7 r ,68 0t{FT 1A 0.00 SEE NOIE B

Ft 14 8Ft 1 24 2,e4 ON ON ON ON 0{ OH DH ON OH

FI l A 6Fr 1 33 CC CRD BSTR PUI4P I.2 SUCT VLV ON oftFI l A 8Ft t {o RCS SFAS CHl CTUT PRESS. SY. I.Y. Hvz000 0. l!FI l A BFt144 CTTT ISO VLV PENT 15A xv200eFl l t BFr 1 25 PRJR VAP SMPL LINE VLV CTF Fffi VLV OP HV2f9A 0.r! 0 0,00F11l BF1121 PRIR LOD. SXPL LINE VLV HV2lE8 0.r! 0 0.00FlIA BFl I ?8 PRIR SHPLE LIHE ISOLATION VLV HV240B o. f,l t00 0.26 0.5? ON 0tr

P8E55URIZE8 SPRAY LINE )SOLATION V^LVE HV?7J6 o, ]I 0 0.00 0. o0CTRH EI4ER CNDS UNIT ? VLV xv?9?B o.l l o o. oo o.m

0,r6 ro0 o. l7 ON ON 0il 0t{ ON ON oat

Fltl 0. J3 ro0 0.5? ON OH ON fr ON ON

Flt A 0tr OH ON ON 0[ ON

FTIA 0tr ON ON ON 0x OH

FTIA Brr | 82 CTHT VCX RELIEF VLV ] G{ ON ON ON ON ON

FITA Blr r g3 CTI'T VCH RELIEF VLV ON ON ON OH ON

FIiA BFr r 84 CTIT VCU PELIEF VLV IIOTOR ON ON ON otr ON

FIIA BFl I 06 CC U^TER DISCHAROE LIHE 2 ISO VLVFIIA BFI19 CC YATER IN LINE 2 I5O VLV xv5098 .60 0FllA 8Fil18 5G {E AUX FO TATER ISOLATION VLV HVSgT .t.00 0 0.00FllA BFl1ll sG re oPllll LIHE lsoLATtox vLv uv505 o,6? 00 0.80 4t 0l{ ON OH

clirT lso vlv xv6{e? o.70 0 0.00 0.00CF TANK 1 -2 I SO VLV rcIOR TVCFl A 1 0.50 o o,00 0, oo

0 0.00 0. 00CF TANX 1 -2 VENT VALYE IVCF5A o o,00 o,m

0 0.00 0.00

FlIB ON ON ON OH ON 0t{ ON

FlIE 8Fr r 56 CC YATER OUT I5O VLV E FEOH CIflT 0tr ON 0t ([rFlrA Brr 1 59 CC YATER TO CTI'T ISO VLV

FIIE BFI I 47 CIBT SPHAY PUMP 2 OUT VLV HVlSll 00 00FIIB BFlr75 CC YATEH IO CRD COOLER INLEI VLV tavl 5678 0.66 100

FiIE EFI r 5e CTf,T TORTAL SUXP 15 VLV HVZOI 2-8 o,65 r00 0. s0 0x ON

CTRL RTI EI'iER VEHI FAN 2 IN VLV xv5?6?r o. f,3 0 0.00 0.00CONTAIN[ttrT/ANNULUS O/P I50 VLV HY62{E o. f,3 0 0.00 0. 00EUST LIHE OUT VLV A HVOH?A r ,00 100 t.l{ 1.?! 0lr ON OH 0t{

100 r,?1 0,91 OH ON 0tr ON OH ON otr ON

Fttc BFr r 66 00 2. ?8 2. J{ ON OH ON ON ON ON

Ft l c 8Fr 1 r? AFPz SUCTIOI{ YLV

FllC EFr r 2g DH NOHHAL SUCI:oil L]NE 2 ISO VLV XOIOR

FrlC BFr 1 l4Fl1a 6Ft151 CTXT H? PURGE OUT I5O VLV 2 Hv!057 0. !J r00Flla LOT PRE55 INJECI VLV 2 IIOIOft IVoHI iFllf 8F1 1 l9 flPl z-1 vtlvE HoT0R HYHP?T 00 r00 75

XPI E.? VALVE XOIOR UVHP2B r00 7l

HYOFOCEN PUR6E SYSTET fILIEN tF60 2.O0 kvl o o, o0 0,00rEI12? r.50 wr ro0 7,5Q o. 00p0I6? 5 0 0. o0 0.00

r00 7.50 0.00 ON OH

Ftto 8Ft187 84 { 3,86 {{. I6 SPIRE ISEE HOTE 3)oil

Fllo BF1 1 55 ECCS sUf,F PUHP ZN 5.96 OH

F1l O BFl l5{ ECCS SUM PUXP ?B

Ftlo 8Fl r 6r CC AUX ELDG TO LII]E 2 I5O

FIID BFr I 64 CTHT H2 PUE6E FAN 2 SY Iil VLV

F!ID BFr r 18

FIID Brr r 79 RM lt5 HVAC t50 VLV 2 rv54{2 0.1 3 100 o.24 0. l7 0xFItD BFtr17 HAIH FO CATER 2 I50 VLV HOIOR Lv60r 39. {0 100 lJ. ?2 r 8.20 OH

Fttn BFr r 85 DECAY HENT 1.E OTLT CC YLV HVSIO l.oo 0 0.00 0.00CTMT ET.fR SUMP OUT VLV xv0H9t l.oo 100 t.i4 l.?3 ON ON ON 0h ON

HVHUl 28 o 0. oo o. oo

[co]r r ?.50 100 7,ll 4,51 0a{

00 7.93 4.95 oar

FIIE 8Fr 1 95 0 0.00 0.00FtlE 8Fl I 9{ HPI PUI'iP I.2 HIH RECIFC I5O VLY

FIIF srl 2l lokva 0l5T xavR OH 0tr or OH ON OR ON OH

F lZl BFr23o OIES.6EH.FUEL OIL 5IOR. E TRANSF FU HP OH ON OH OH 0ilFlZ^ gF tzzg CTFX.EI{ER.SISI,STANDBI CONO,UNlT 2 cs06r e ?.50 00 6. rl 5.?8 ON 0xFt?^ 6F r 205 NFP ROOH VEHI FAN A taco? 3 2 ?.50 00 6.68 {,{9 0t{

Ft?l 8F r e04 LOY VOLI SBCR. RM, VEHT. FTH 2 rcor !l 0 00 8. 7r 5. {l OH ON

EI'ER VEI{T FTN 2 HC0]0a t5 r0o 1 2.20 ON ON OH

BATIERI CHABGEF 2P DSC?P 7{,6 kvl 84 {3.85 44.75 ON ON OH OH 0x 0il ON (SEE NoTE 3slBAI'EEY CHARCER 2H D8C?H 7{.6 kvl 04 41. E6 44, ?5 ON ON OH OH ON ON 0x (sEE N0IE 3sl

YRF Z ?0.00 kv^ 55 l 0,40 7.80 ON OH OH otr OH ox ON ON 0t{ ON OH OH

ON ON ON OH 0il ON ON 0tr ON OH ON

Ft 2r BF 1 Zll HP] PUXP 2 AC LUBE OIL PUTP ON 0tr ON 0x 0f,Ft z^ BF1213 PRzF sEATER rstE NoTE ll l ON ON

Ft?L BFl?II PRZR HEATER YLBI ? {?.oo kvl o0 0tr ON

Ft 2l BF12!5 PRZF HEATER ON

FI ?A EFIAlE EHER. VENTL. FAN IH DITFER 2 xc50r 6 0.5l o0 o.51 0xFlzA BF I ?25 EITRGEflCT YETI sYsTET CRO55 TIE OUCTYOFI DAXfEB xc505? 0.31 0.00 0.00FI2A 8Fr22l CIIT AIR COOLER 2 5T IN ISOLAIIOH VLV HYI 557 o. f,l 100 0.3r 0. {? ON OH

FI2A RCS LEIDOYII COOLER *I CCT I BYI 409 o 0. 00 o, o0RCS LEIDOYH VLV 2 CCT INTAI(E VLY rvl 4r 0 0. ]I o 0. o0 o. ooFRZR SII#LE Ltr IO CTI'T VENI HENOER VLV cY?00 0.1 3 0 0. o0 0. o0

100 5.08 ]. 17 0t{ ON ON ON 0il OH

Ft 2n 8Fr ??5 EVs TO SPENT FUEL POOL A"CONffECT OMPP 0.3t 0.47 ON ON 0! ON 0rF!24 8F 1 239 LOI VOLTAOE STCR RII 428 VEXT flOTOR

F! 2A BFl2l 0 EATTERI NOOX {?9A TO ATH OACPER ON 0f, OH ON OH OH

FI 2A BF 1 208 I.IU PUI'P DISCH CROSS CONNECT LINE I5O VLY

Fl ?t BF 1 2f,7 C LETDOTN COOLER I.I I{LET VLV OFERATOR .00

NOTES1. LOADS INOICAIED ]H SIEP I ARE THOSE IHAT STAET A5 SOON

AS lHE EUERGENCY DIESEL CENERAIOR IED6) EREAKER CLO5E5.IHESE LOAOS CONSI5T OF NOflHALLY OPER[TING OR If,IER9]TTENTLOAOS NOT SHEO BY UV SIGNAL OR LOADS THAT RECEIVE ISFAS SIGNAL ANO NRE NOI BLOCXEO BY THE SEOUENCER.

?. ]F MU PUMP YAS RUNNINc ON THIS 1RAIH PRIOF TO LOSS OFOFFSITE POUER ILOOP1 II YILL BE SHEO 8I UV RELAYS ANOSTART 8Y T]fE 8ELA1 RELAY 2.5 SECONOS ISIEP 1A] AFIERIHE EOC OUTPUI EREA(ER CLOsEs. HU PUF TILL BE IRIPPEDAUTOHNTICALLY IN STEP ] IHEN DH PUUP IS sTARTED BY 5FA5FOLLOYING A LOOP.

f,. 5Y]N6 CHARGER NOI ilORYALLY IN SERVICE. II CAH 8E PLACEOIN SERVICE I,(AilUALLY IF EP OC ?tr I5 trOI AVNILAELE.

OUR I NC BATTERY CHARCER SURVE I LLAHCE TEST I NG. ALL IHEEEEATIERT CHARCERS (2N,2P,2PN- TfO OPERNIIHG AI IH€]RSTEADY-sTAIE ANO OHE AT II5 IESIIKG LOAD] ARE IN sERVICEPRIOR TO AN EVENT (LOOP OR LOOP UIIH LOCA). IHE LOAO VALUEREPRE5ENI5 THE STINC CHARGER PLACEO IH SERV]CE XAHUTTLYIS 2P OR 2N,

]O. C-EE-O15.O3-OO8, ATTACHMENT 5, ESTAELISHES THE COilTINUOUSRATIX6 { }4.6 I(V^] AHO OPERAIINC LOAO PERCENTiGE {8{IIFOR THE CONTJNUOUS sIEADY"SIAIE LOAO OF THE BATTERTCHARGERS. THE f,Y AND (V[R ARE CALCULAIEO BASEO UPOtr THE

4. DELETEO

5, DELE?ED

5. REOUIRES SPECIAL 8US ALIGHUENI.

T. OELEIED

B. THE COTITAINMENI HIOROGEN OILUTION sYsIET ICHO) I5INITIITED APPROXIHTIELY EI O[Ys POSI LOC' tBD REOUIRESBANUAL LOAOINC ON €OCl-?. IHE HYDROGTN FUR6E SYSTEH(YF6O) I5 A BACXUP TO IHE CHO SYSIEiI, IF FEOUIREO.IHE SYSTEH ]S HANUALLY AC|UAIEO AFPEOXIHATELI IIODAYS post L0CA.

9, OELETED

]O. OUfiINO A LOCA. MAXE-UP PUMPS ARE HOOELED TI RUI.OUI1560 bhP}. THESE PUHP$ ANE IT LOIER OUIPUT OIJRIXC A LOOPONLY EVENI, IHE SECONO LOAD VALUE IN EACH COLUIfiREPEESENTS THE LOOP LOADIf,G OF THE PUUFs.

11. FOR LOCA/LOOP IHE LOAOS LISTED ASSUI4E N LAftGI LOCA.FOR A LARCE LOCA THE ESSENIIAL PRESSURIIEi HEAIERS T]LLTOT HE),AIII ENEROIZEO, ONLY FOF VERY sf,TLL LOCA5 YILLHEAIER5 REX[]X EXERGIZEO, ]N THICH CASE OTHER LARcERLOADS SUCH AS CTHT SPRTY PUT'PS HILL NOI 8E PFESEXI.

1 2. OELETEO

1]. ICE YAGNITUOES OT THE LOAOS FEO FROT BUSsEs C2 AHO O?ARE PFOVIDEO AS INFOFHATION IO THE @EEAIOH IN

'HEEVENT THA] IHEY ARE 8AC[FEO. EEFORE THESE LOAOS CAH 8EAOOEO, HOTEVER, THE OPERATOR UUST VERIFY THAT THEIRADDITION CILL NOT OVERLOAD lHT EO6.

t4. DURING EDG OPERTIION. ONCE lHE JACXET TATER TETPEHITUFEREACHES 155'F. IHE EDC IUHERSlON HETIERS YILLDEENERG I TE.

I5. DELETED

I6. CONTAINT'fNT LICHTI(6 TRANSFORTf,RS ARE HOT INCLUOEOIN THE TOTAL LOAD AECAUSE IHEY ARE REOUIRED IO BEDEENEROIZED DURING CTUT CLOSEOUT.

t7 THERE IS NORTALLY ONLY OtrE RUNNINc COHPOIIEtrT COOLINGYATEF (CCY) PUIiP. YHILE STAPPIIIG IHE RUTINII{G AhD SPTREPIJI.IPS. TYO CCT PUI,IPS ARE IEPORTRILY RUTNITC Of, THESAHE BUs. ANO TOULO RETA]N OH THE 8US IF IHE EOC IA5STARIED, THIS IABLE ACCOUNTS FOP OTILY OI{E CCY PUIfSECAUSE PEOCEOURES DIRECT THE OPERATORS IO !IHIT THEAf,OUNT OF TITE THAT IUO CCT PUHP$ ARE CONHECTED

'O IHE

SAHE EUS DUE TO EOB LOIDINC COilCEFilS.

1 8. DELETEO

1 9. OELETEO

20. FPOO33 ANO IIPO4JS CAI{ BE OPERATEO IN PLACE OF IFOO]IAHD MPO4]1. RESPECTIVELY. THE HPMf,] AEO UPO4JI PUUPSARE sELECTEO TS PUNIIK6 SECAUSE IHEY REsPRESENT THEIr.!05T CoNSERVAIIVE 1040.

EI. IRAtrSFORHER CORE LOSS€s iRE LISTEO Of, IHE TABLE FORPURPOsE OF REPRESENIING IO]AL OIESEL OEHERTTOH LOAD.THE IOEHlIFICATION NUI€ERS L]SlEO UNDEE Bf,R- ANO AOAO-FOR IRANSFORHEF CORE LOSSEs ARE FICIITIOUS ANO OO trOTEXISI ]N THE PLATT OR IN sAP.

22. 1OOP I-CONSISTS OF INT LOAOS IHAI ARE ADOED IO IHE

LOOP EVEI{T.

23, IF THE BUNNINo CCI PUUP VAs ON THIS TRAIf, PRIOR TO THELOOP.ONTY EVENI. II IILL HESIARI TflEN IHE EOG OUIPUIBREAXER CLOSES ILOOP I I. JF THE XT' PI.JS Tis RUNtr)t{G OHTHIs TRAIX PEIOR IO THE LOOP-ONLY EVEHT, IT V]LL 8E SHEOBY UV RELAYS AIIO SITFI 2.5 SECONDS AFTER IHE EO6 OUIPUIBREA(ER CLOsE5.

24. IOOP 2'OCCURS IEN (1OI SECONOS NFTER THE EOG OUTPUTBFEATER CLOSES, ]T THE CCI PUHP ASSOCIAIEO UITH THISTFAITI IS IT STAIIDEY PFIOE IO IHE LOOF.OBLI EVETT,II YILL SIART OURIBG LOOP U,IHE EDG AIR COPRISsOP I€ YILL START 20 sECOtrOs AFTERIHE EDC OUTPUT BREII(Eft CLOSES FOLLOIIN6 A LOOP EVENI,

?5. tOOP 3'OCCURs TYEHTY.OHE I21 ) SECONOS AFIER THE EOOOUTPUT BREAKER CLOSES. THE 5Y PUMF SIARIS IN LOOP ].

26. f,AINTAIN ffiC F]3 ALIGNBEII'TO NORf,IL SOURCE UflII 'U8

F7UNLE55 FO8XALLY EYALUAIEO IN C-EE.O15-05-OO8 A5 ACCEPIAELE.THE LOAO Y]LL 8E ON IHROUoHOUT ENIIRE EOG LOOF/LOCA ANDLOOP Of,LY sEOUENCE5. OR CIfl SE CAXUTLLY LOIOEO ON frEH Nf,ILTERNATE ALIoIIMENI HAs BEEN EVALUATED III C.EE.OI5.03.OO8A5 ACCEPTIBLE.

GENERAL NOTESUPPORIIH6 OOCUTiIIIITAIIOH FOR LOAD SEOUETICIHG ATO OH/OFFOETERMINATIOH, A5 UELL A5 FOR LOAO VALUES, I5 OOCUI{EHTEOItr CALCULATION C.EE-OI5.OO3-0O8. OISPLIYED LOAO YALUES

'ORTOTORS ARE CALCULATEO YIIH CONSIOEEA'IOil IO I'OTOREFFICIENCY ANO POYER FACTOR gY ETAP POTERSTATIOft. IHESUHARIZED IOTAL LOAD Otr THE EIf,ROEHCY DlESEL GEifRATORTAIES IN IO AcCOUNT SISTEH LO55E5. ITCLUOING 4XV AtrO {8OYPOUTR CABLE LO55E5 ANO I5 NOT OERIVEO FROH IHE ADOITIONOF XILOUATTS ANO X]LOVAFS ]N THE COLUHf,S L]STED.

REFERENCE DRAUINGE-5E-{ 5H.2E-5 SH.2E-5 5H.2E-9

-5

4.I6(V ONE LINE DIAGFAE48OV UNIT 5U8 STA ONE LINE DIACRAT48OV TCC INON ESS) ONE LINE OIAcFAX48OV HCC (ES51 OilE LINE DIAGRAI

a40 vtc tND t20 vac HccS (Ess)ONE LINE DIACFAi{

E IB SFAS ACT!VATED EOUIFHENT IAEULATION

DAV ]S-BESSE NUCLEAR POI.IER SIAT ION

EI'4ERGENCY DITSEL GENTRAIOR I-?LOADING TABLE

t-1043 sH. I

IABLE 8. ]- I

PAGE 8.3-53

REVISION 32

SEPIEI4BER 201B

DB I l-20-17 0FN=t r/ELEC/I104lSHt.0GN

6US BTR EOU I PIf,NI DESCB I PT I OI{ LOTD [I IIt LOAO

[vlR ATT LDAD

SITP Ir stElr}tE r r

lItP lo T$ruALLoA0l l{cSIEP I I SITP I I SIEP IV SIEP V FEt IR(S

LOOP (NL?

ITI!E LOOPIISEE IIOTE?2 I ?!r

LOOP?I SEE HOIE

211 IlrxuAt LoADlN0 LOIDS ADOT,D IHnl'

BTEI TETDIXG nJs.!EE EtE t [ 9.r r

REHTFXSHP /KYA I

480V MCC

FI2B 6Fr255 EXER 06. ROOH ? VENT FIN ] 0 r{c025] 7.50 100 E.6r ,37 ON ON ON OH OH ON ON ON 0il ON 0[ ON

8Fr256 EilER. OG. ROOH ? VENT FAN { r1c02 54 7.50 o0 9.45 ON ON ON OH ON ON ON ON ON ON ON

FUEL OIL BOOSTER PUHP rf 1592 l 0 0.00BATTERI ROOU VENI FAN 2 rcora2 l 00 05 .53 ON oil OH ON & ft ON off OH

F1 28 DIES.OIL PUHP HSE.ELECT.UNII IIIT. A lE]094 {.00 kvt 100 4.00 0.00 0tl ON ON ON OH ON

Fr 28 8F r e58 c362? 1 5.0 kYl 100 15.OO 0,00 0x ON ON ON ON ON (sEE NOTE I4)F128 gFr26l 10 100 10,?1 5.{ ON ON

Fl 2A 8F 1 26r EHEE. O. G. 2 5OA(.BAC( PUMP 00 0.90 1.U OH ON ON 0tr ON ON ON ON ON ON ON

Fl ?8 BF 1 257 FIRE FUMP D O. TRANSTER PUHP E 0.00 0.00Fl ?8 BFt 289 EDG 1 -2 AC TUFBO OIL PUHF HFI 47 -4 0.81 ON 0x ON OH ON OH ON 0tFl EB BTI ?68 DEISEL O1I. FUIP HOUSE SUMF FUBP I.I8 ON 0h ON ON ON OH ON

F1 2g 8f t ?52 AFP 1 -? IO SG sTP VLV OPER rrYaeT2 ?.60 f,. 71 ON 0t ON OH OH OH

F I28 BFl ?60 PRESSUFIZER 1 SPFAY VLV TOTOR MVRC2 oo8F1 ?70 l?oYAc f,cc YFt Loao IF 2.00 wa o0 ,60 ON ON OH 0h ON ox ON ON ON ON

SERYICE TTIER PUF SIRAItrER ? FO152 I r00 0. s6 0x ON OH OH ON ON ON

SER. YTR PUTP SIRAIHER ? DRA)E VLV HV1 180 o, f,l 0 0.00 0.00Hvl 595 0, ?0 100 o.80 41 0{

Fr2C BF 1 ?81 Mv?9!0 1 .00 0 o. oo 0,00F 12C BF I 202 0 0.00 o,00

F1 2D gFr 2t 1 5T PUIF YENT FAH ] llr I,ls 6.91 ON ON ON ON ON ON ON

FI ?D BFI EJ5 5Y PUHP YENT. FAX { 8.26 5.89 ot OH fr ON ON ON OH ON

BFr 3r 5 BA ADO. II( ROOS sTC. SPACE HIR. YEOSO? f,g kYl (SEE NOTE 26] 0tr

6A LIHE5 HEAI TRACIilC sEC. SISTEU BASSY il1.00 kYl ( SEE NOTE ?6 ] ON

TUPBINE GEXERAIOR GEAR OIL PUF iP0200 50 r00 ISEE NOIE 26] ON

IURSINE CEtrERAIOE IURH. GEAR Hm82 60 r00 51.18 t5.58 (sEE HOIE 25) ON ISEE NOIE 26IIURSINE EEIR]XG O]L LIFT PUIP I FOz5l 100 4. a? 3,58 {SEE trOTE 26J OH (SEE NOTE 26}

TUREINE BEAFTNC OIL LIFI PUlf ? p0254 5 100 4. {? 3,58 (SEE trOTE 26] OH {5EE HOTE 26}

IURSII{E 8€ARING OIL LIFI PUMP } F0251 100 4.4? 3.58 (SEE ilOTE 26I oil ISEE NOTE 26IFT I IUREINE EEARING OIL LIFT PUHP. FO?5{ 100 4.41 3,58 oil ISEE NOTE 26}

Fl5 r00 {, {7 0l{ ISEE NOTE ?6)

Fr ! BFI fz{ IURAIHE EEARIHC OIL LIFI PUHP I 100 t.af ON ISEE NOTE ?6)

Fr 3 BFI ]O? ETEF I HST 0.r2 (SEE HOTE 26,

Ft{ BFI 40r COilIAIHI€ilT AIR COOLER FAN 2 . HS

Fr{ 8Fr 401 CONTA]XT€TT AIR COOLER FAH 2 - LS k6001 ? {0 OH fr

CONTAIN'{NT AIR COOLER FAH 3 . HS EOOl f, 50 SPTRE SPTRE

COHTAINI{NI AIR COOLER FAN J . LS t{c001 l {0 0.00 SPNRE SPTRE

5TA,VEHI,NORM RANGE RAO,MON.RE4598BA PUHP p?7{ -} 0.5 ro0 3t t0 ON 0fi ON ON ON 0f,

Ft6l BF 1 623 SPARE

F1 6A 8F1 61 7 0 0.00 0,00FI 6A 6Fr 61 6 OF TO 81PAS5 VLV IN THE UUSZ HFLH LIffE 0 0. o0 0. 00F1 6t BFr 62{ ISOLITIlTER (CONs]ANI VOLIAOE XFI{R} XYA 11.r9 oil OH ON ON ON 0{ OH

F15t BFI 525 ISOLIMIlER tCOBS]ANT VOLTACE XFilR} XY4 1t.r9 0x ON 0tr ON ON OH OH ON ON

Fr 68 BFI 609 SPAFE

Fr 68 BF1 61 0 CTUT AIT RAD BON RE4597SA PUMP trP27l.t/{ ON ON ON ON ON ON 0t{ ON 0u

F7t BF?1 05 EIAC CLOsED COOL]HC LOOF FAN I ucl { 51 3. O0 00 1 .36 ON

Ffl EFll 05 EIAC CLOsEO COOL]NC LOOP FAN 2

8F71 l4 l.tPz42 - 1 0.75 00 ON

BF?1 05 EXER IHSI AIR CLOSED COOLING LOOP PUXP I HF250r 1.50 00 6.5? a, l7 ON

EH€F IiIST AIR CLOSEO COOLING LOOP PUHP 2 MPz60Z ?.50 6.52 ON

XFE FOR PNL 13{01 x3402 to.00 wA 3f,. 3f, 8. OO 6.00 ,!d\ l_oN Yrd\XFTR FOR RTCEPT Rt{ ll{B x1401 15.00 kvr 8. OO ON

F8l 2.{0 kvl r00 r .92 1 ,44 0tr

F8r BFEr 05 XFH OFI CORE LO55 OFSCL 6.00 wl 100 0.80 5,95 ON

F8r 8F8r Ot DG ]TOiERStOH HEIIER 06 IH 1 5,00 kvl 100 1 5.00 0.00 (SEE NOIE I{} OH

F8r ErEr r a FUEL OIL IAil( FH UNIT HTR E?07 5.00 kvl o,m 0.00

8r BfBr r l vf,NT Flh HCI 52A 00 4. ]9 2.rl ON

F8l EFSt 1 4 HCI 5?B 5 o 0.o0 0.00

F81 8F6t 1 ? VENI FAN t'tc155 o0 00 0z O, EE OH

F81 8FB1 08 ltR coxPRE$50R ilc4 304 r 0.oo 0.00 0.00

F81 BF81 09 rtR corFREssoft lac4 ]0& 1 0.00 0 0.00 0,00

F61 8F8r r 0 RAOIAIOR FAT lEz1 r A 1 5.00 0 0.00 o.00

Fg1 6F81 r 1 RAOIAIOR FAN HEzI I B 1 5.00 o.00 o.00

F8r BFSl I 5 FZ79A o. t5 o.00 o.00

F8l BFSr t 6 SUIf PUI.P HF219g 0. ?5 0 0.00 0.00

F8r BFEI 07 DEISEL 6EN TURBO LUBE OlL PUI,P PEEOA 0. ?5 r00 o. 72 0.96 ON

F8r BFSl 06 F2809 .00 r00 o.9? 1,10 ON

F8r BFEr Ol 480 VAC RECEPINCLE zR30r r 50.00 w^ 0 0. o0 0.00

F8l BFEI 04 460 V^C RECEPTACLE zRl0l ? o, o0 0.00

F8l BFEI I 7 X]05? LTG TRANsF TJ05Z 50.00 wl t8 17.10 0.40 ON

JOCKEY FIRE PUT,P HPOO50 5 100 {.5r ON ON OH ON ON ON ON 0il 0ilflF01 5I 1 0 0. oo 0. o0 5PAPE

EF1?C 8EF r 25 rvl l8l 0. Il 0 0.00 0. oo

EF1 EO 6EFI ?9 0. lt o, {7 ON o{ ON ON ON OE

41 60 SICR

D? AD20l STATIOII AIR COi{PRESSOR

D2 40208 rUX. BOILER F.O. FAH HC011 0 400 /r 5 0.mlD21 I L ICHIINO SUB TRANSFORH€R 0F5 28J.00 kv/ 0l0?1 r 5TITCHYARO FEEOER r"2 r00.00 kv, 0 0. o0 0. 00

2.9.q!_J.EE\F2 YF2OI CICT ANILYZEF SAIIPLE LINE T4 IN VLV OP 0 xY50r 0a 0. l3 r00 a, f1 o, 4l oil ON ot ON ON ON

YF? CTHI ANTLTZEF SATFLE LIHI * IN VLV XIR OP gv50r 08 0. 13 r00 o, f,1 o.47 oil ON 0x 0tr ON ON

0. l3 r00 o,lr o, {7 ox ON 0il ON ON ON

\F2 r00 0. l1 0.4r ffi OH ofl OH OH ON

1F2YFZ

Ys205

tF2t2 CC PUBP FAN RX

OP yv50r oE 0,33o.t7

r00loo

0.31 0. {1o.13

OH OH OH

0flOH

OH

ON

ON

ON

ON ON

\F? YF2O8 XFTG YF26 LOAO YF?B 2.00 hvl ON 0r ON ON ON ON 0il ON oil ON 0tr

olEsEL trfltG

FOR 2OOO HOUES

FOR EOO HOURS

FOR 7r HOuR

FAIEO OUTPUI

OVEFLOAO OUIPUT

?600Kt

2A60Kr

z8 5EXr

2946(rJ0!5xI

NOTESt6 trorag.LEctro I ltFEltr*t DR rtrGtETE sI{EEI I.

DAVIS-BESSE NUCLEAR POI,JER SIAIION

E[,{TRGINCY DIESTL CENERAIOR I -2

LOADING IABLE

t- I 04J SH.2TABLE 8.3- I

PAGE 8.3-54

REVISION 3?

SEPTEi.,1BER 201B

DB 05-08 l8 0FN=t r/ELtC/E104l5ll2.DGN

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-55 UFSAR Rev 31 10/2016

TABLE 8.3-2

Administratively Controlled Circuits (AC)

DEVICE NO. DEVICE TYPE DEVICE LOCATION

TYPE OF OPERATION

ITEM 1 CBY305 Circuit Breaker Panel Y3 Kirk Key

CBY105 Circuit Breaker Panel Y1

ITEM 2 CBY405 Circuit Breaker Panel Y4 Kirk Key

CBY205 Circuit Breaker Panel Y2

ITEM 3 Y101/YAR04 Transfer Switch Panel Y1/YAR SPDT

ITEM 4 Y101A/YAR06 Transfer Switch Panel Y1A/YAR SPDT

ITEM 5 Y201/YBR04 Transfer Switch Panel Y2/YBR SPDT

ITEM 6 Y201A/YBR06 Transfer Switch Panel Y2A/YBR SPDT

ITEM 7 Y301/YAR05 Transfer Switch Panel Y3/YAR SPDT

ITEM 8 Y401/YBR05 Transfer Switch Panel Y4/YBR SPDT

ITEM 9 BE F154 Non Automatic BE F152 Circuit Breaker MCC EF15 Kirk Key

BE F153 Circuit Breaker MCC EF15 Kirk Key BE F151 Non Automatic

Circuit Breaker

ITEM 10 BE F121 BE F122 Circuit Breaker MCC EF12C Kirk Key

ITEM 11 BE F128 Non Automatic BE F129 Circuit Breaker MCC EF12D Kirk Key

ITEM 12 BF 1310 Non Automatic BF 1304 Circuit Breaker MCC F13 Kirk Key

ITEM 13 AC108, AD108 Circuit Breaker 4160 V Swgr. Insert or Withdraw AC113, AD113 C1, D1 Breaker

ACD2, ACD3 Non Automatic Transfer Open or Close with Circuit Breaker Swgr. CD Kirk Key Interlock

ITEM 14 BE1168/BE2238 Circuit Breaker MCC E11C/E22A Kirk Key

ITEM 15 BE1167/BE2237 Circuit Breaker MCC E11C/E22A Kirk Key

ITEM 16 BF1114/BF6204 Circuit Breaker MCC F11A/F62 Kirk Key

ITEM 17 BF1115/BF6205 Circuit Breaker MCC F11A/F62 Kirk Key

ITEM 18 ACD4, ACD5 Non Automatic Transfer Swgr. CD Kirk Key Circuit Breaker

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-56 UFSAR Rev 30 10/2014

TABLE 8.3-3

Administratively Controlled Circuits (DC)

DEVICE NO. DEVICE TYPE DEVICE LOCATION

TYPE OF OPERATION

ITEM 1 D1P02 Disconnect Switch Panel D1P Sliding Bar D1P01

D201 Disconnect Switch DC MCC2 Open 400 A Fuse DC MCC2 Remove

ITEM 2 D1N02 Disconnect Switch Panel D1N Sliding Bar D1N01

D232 Disconnect Switch DC MCC2 Open 400 A Fuse DC MCC2 Remove

ITEM 3 D2P02 Disconnect Switch Panel D2P Sliding Bar D2P01

D102 Disconnect Switch DC MCC1 Open 400 A Fuse DC MCC1 Remove

ITEM 4 D2N02 Disconnect Switch Panel D2N Sliding Bar D2N01

D133 Disconnect Switch DC MCC1 Open 400 A Fuse DC MCC1 Remove

ITEM 5 D1N05 Circuit Breaker Panel D1N Kirk Key

D1P05 Circuit Breaker Panel D1P

ITEM 6 D1N07 Circuit Breaker Panel D1N Kirk Key

D1P07 Circuit Breaker Panel D1P

ITEM 7 D1N09 Circuit Breaker Panel D1N Kirk Key

D1P09 Circuit Breaker Panel D1P

ITEM 8 D2N05 Circuit Breaker Panel D2N Kirk Key

D2P05 Circuit Breaker Panel D2P

ITEM 9 D2N07 Circuit Breaker Panel D2N Kirk Key

D2P07 Circuit Breaker Panel D2P

ITEM 10 D2N09 Circuit Breaker Panel D2N Kirk Key

D2P09 Circuit Breaker Panel D2P

ITEM 11 43DC/HA01 Transfer Switch HA01 DPDT 43DC/HAAC Transfer Switch HAAC DPDT

ITEM 12 43DC/HB01 Transfer Switch HB01 DPDT 43DC/HB14 Transfer Switch HB14 DPDT

ITEM 13 B302 Circuit Breaker DBC1PN Kirk Key

B303 Circuit Breaker DBC1PN

ITEM 14 B302 Circuit Breaker DBC2PN Kirk Key

B303 Circuit Breaker DBC2PN

Davis-Besse Unit 1 Updated Final Safety Analysis Report

8.3-57 UFSAR Rev 30 10/2014

TABLE 8.3-4

Environmental Requirements for Class 1E Cable WITHIN SECONDARY SHIELD WALL TEMPERATURE HUMIDITY PRESSURE RADIATION CHEMICAL SUPPLIER** DBA 287 °F 100% RH 40 psig – 1 Week 108 RAD Total 2800 PPM Borated BIW Water 1-Week*** NORMAL 122 °F 100% RH ±0.5 psig 3.5 x 107 RAD Total None WITHIN PRIMARY CONTAINMENT DBA 287 °F 100% RH 40 psig – 1 Week 108 RAD Total 2800 PPM Borated KERITE, Water 1-Week*** BIW NORMAL 122 °F 70% RH 0.0 psig 3.5 x 107 RAD Total None WITHIN AUXILIARY BUILDING DBA 122 °F 100% RH 0.0 psig 3.5 x 107 RAD Total* None OKONITE, NORMAL 122 °F 100% RH 0.0 psig 3.5 x 107 RAD Total* None KERITE, BIW, CCC OUTSIDE ENVIRONMENT DBA Same requirement as within Auxiliary Building OKONITE, NORMAL Same requirement as within Auxiliary Building KERITE, BIW * Requirements are not applicable to interconnecting cable between SFAS Cabinets which will withstand 104 RAD. The dose in the Cable Spreading Room and the Control Room will not exceed 5 RAD over 40 years of normal operation plus 5 RAD during the DBA. ** Suppliers are listed for historical information only. Other suppliers may be used as long as requirements are met. *** For pH Control reference Section 9.3.3.2

i 'S HXl lB

NJ; [2000A J l 750MVA

x x ~ }HBBF2 gt HBBFJ

~ ? ··- ~ ··-··-· ~ ·-··-··- ··-··-··

x REACTOR COOLANT PUMP NO. 1 ·2 9000HP < t HBBF4 < 'SHB80 REACTOR COOLANT PUMP NO. 1· 1 9000HP g ) o CIRCULATING WTR . PUMP NO. 2 4500HP ~ J; ~ J; CIRCULATING WTR. PUMP NO. 4 4500HP

;.~---··-i-T---- ~~~-~~~- --·- ·· -··-· · -seo~i~:JoY.T~-oJ[i.~;f~[~Al°R 8 87

" IT0Fs;os

• ~ TRANSFORMER "BO' ~· •-f:-0-11• .:. · SH.5 11/16MVA DA/FA -:c\8 c Sin

~~! ~~IsE ~~~v~ra A 1°6.41. @12MVA ~ )AOJOI b, 4200·480V

C ~ N 4. I 6K VA ~

FROM 345KV SWITCHYARD

z{ A<J: ~ B

•Ac

STAR T-UP TRANSFORMER "0 I ' 39/52/G5MVA OA/FOA/FOA SS'C RISE l•, 60HZ 345KV·l3.BKV Z•9. H Z @39MVA

8 •Ac

TO 345KV SWITCH YARD

MA IN TRANSFORMER ' I " 980MVA FDA 65'C RISE

•<J: ~;: l~rv '. J45K V AUXILIARY TRANSFORMER --------- Z~l4.27Y.@9BONVA

~F~i·c RISE [!' 25KV-ll.8KV 8 ZIH·XJ•ll. 11., AAc Z! H ·Y 1 • ll. I 41., Z<X·Yl•25. 27. @52~VA

,- ---- ·-------·--- ___ _____ ,. ____ ____ _____ __ _ -----··---------- -------- ----------------------i gt HXOIA g t) HX02A g ~ HXllA ! ~ ?ND ~J;NO ~.r ! r [1~~~~] l I 3. BK v SWGR BUS 'A" r !

REACTOR COOLANT PUl-f' NO. I · I 9000HP x x x ! REACTOR COOLANT PUlol' NO . 2-2 900011' t t t t I CIRCULATINC 'OIR. PIMP JlO. I 450011' g ) HAAC g ) HAAE4 g ) HAAE2 g ) HAAEJ : CIRCULATING WTR. PUMP NO. J 4500HP ~ J; ~ J; ~ J; ~ J; !

··- ---··-··-·-· ~;l~~ii:~:~-.;~:j;j;·-· ''-··--··-··-··-·" ·-··-· _) ··-··J 12/16MVA OA/fA .....- "'?i l•, GOHZ 'i ff a c K~~~~ 16Kv "'" e / oG.417. @12MVA l-{C

I J. 6 KV-4. !6KV t B~~ J0,61llZ

J; o [1000A J SWGR. ~ y 150MVA BUS "03" ....-------------------------------1----4--1-------~-------

EMERGENCY DIESEL GENERA TOR 2 2600 KW 0.80 P.f. Jo , 60HZ

i·-- ----··-··-··-··-··- -----·-··-··-··- --·-··-:

i .;:!i t ABOD2 .;:!i t A021l ."\? A020F7 ! ,o J o J o I

I ~ ,J; [1000A J~ J; ~ i 4. 16KV 250MVA f SWGR . BUS "02' f i

STATION AIR COMPRE SSOR Cl40 l8 2HP : MOTOR DRI VEN FEEDWATER PUMP SOOHP I

~~~~g~[t/~~C~~ - O~AFT FAN I~~~~~ l ~88trn~ m: ~~~~-~b.P~MP NO. 2 l~~~ 1 HEATER DRAIN PUMP NO. 2 JOOHP J SWITCHYARO FEEDER NO. 2 SOOKVA : LICHTING SUB. XfMR OFS 7501\VA I NISC. / TENP LOADS XF14l OF6 7SOKVA :

-· -··--·-··- ··-··-··-··-··-··-··-··-··-··-··-··-!

I

EMERGENCY D!ESEL GENERATOR I 2600 KW 0.80 P.F. l•,60HZ

r-·· ·· -··-··-· · ·· -··-··-· ·-· · -··--·,...··-·· -··-... ·_·-_·_·--·_·--·-· --·-· -..._+-r·_--_·_·-_-_4-_. ·_15_K-_v-.... xF"Uf sw ... GR_-·_"_i:o_"_··_-_·-_-_-·_-,_! ~.-1--··_-_··---··---· ·--~·. -··-··-··-··-· -··-··-··-.. - ·. •. --·-··-.. .. -··

:. ~~AACOI ~ r) AD I OI Q ~ f)AOll0."I T) A0109 NO<'lbi~NO ~ T) AC I 09 ~ ~ACllO Q ~ ~ AC I OJ i r) ABOCI

J. N J; NO - J; NO[NOOA J - .J; ~po Q AC05~ r .J; ~ AC04 - .r NO r 2aOOAJ- r -f NO "po 1

I 4. 16KV x2sOMVA ESSEN. r swGR . I Bus ·f 1"

1

(

51 161

141 t I 6KV I l.?SOMVA 1 ESSEN. swGR. 1 Bus ·c1 l

! ., ? HIGH >RESSURE INJECTION PUMP NO. 2 600HP < t _ ? NO : SERVICE WA TER PUl-f' NO. J :! t NO :! t H0EICl!CAYPRHEE~STUPREU".PIN!,E0C.Tl1DN PUMP NO. I 6400~Pp :! tAC ICEI · g DECAY HEAT PIMP NO. 2 400HP g ) ;:;: g ! 600 HP - ; - ) • " " ~ - ) ! ~ CIJMPONEMT CLNG. PUMP NO. 2 400HP ~ I" e ~ AOlos'i ~ ~ COMPONENT CLNG. PUMP NO. I 400HP ;<: i, ;;_ MSEAKREVICJEP PWAUMPTERNPOUllP. z N

1NOO.T20J G

4o5o0

HHPP ,"- ~ ••• : - ACIOB - .J; ~ SERVICE WATER PUMP NO. I GOOHP - J; - ., ..------....;........;.... _ _,Y !;! MAKE UP PUMP NO. I !NOTE 41 450HP

L.._. -~---·-··-··-· - -··-··-··-· · -· · -··- ·· --·- -··-··-·'---------_.._j _,...----N-'O_<...,tHOT\5f. <NO •------- ------- -~-- --------·-----------------·------- --AC03 ~ r1~ AC02

Ill

Il l 121 COMPONENT COO. I NG PUMP NO. J

'--- ·- -·--·--------~~~~~- - -- - ------·--·-ESSENTIAL

UNIT SUBSTATION "Fl" :-·-·--------.-~B--1~!~i~f&KVA·--.-~fl · - --·--··1 ! "'-l..v C l•, 60HZ C '-'- l..v I j ~ 4.16KV-.48KV ~:

i ~. l •·./ •·/ ~ J:'OF 1-1" ! ~OF 1-2" t c c . t ! : g )eor12 g )BOFll ! ~ ~po ~t 1 ! r 480V SWGR. BUS "Fl" r Q ! ! I !600AJ j

L.·-··-··-··-··-··1~::~?::_1_1 _______ __ __ _____ .!

UNI T SUBSTATION 'EFG" UNIT SUBSTAT ION 'f2" UNIT SUBSTATION "F3" UNIT SUBSTATION "EF4"

J ·- · ·-·iB;i0ff~/i~fs~v;··-·· ~"X~! 3• , 60HZ '-"""° J IT"' I J.81(V · .48~V IT"' .

"BF2" J. •-{8 •-{

8 ., ,l "AF2" 1

~ t) t C o t)NO ! o 0 I ~ J; BBF2 480V SWGR . :£ .j; BAF2 i r BUS " F2' l i

[ 1600AJ j

-··-··-··-··----«.s~:-~::_1_1 ________________ j

~-·x-· --·-·· -··;-2,·:joo~~iso··K-v;·-·· ! : r··~;:-- ·-··--·-··-··- · ·J~;y;i~Jif~~Fi·-··-··- ··-··-··- ·-x-·1 ! l ~..v"8F 3" ~~~F~O~~ RISE '-".,t, Ci : A S,_'-'v l•, 60HZ "'-~ c ! I .(1:""' 13.8KV-.48KV ~ • ' BF 4 ' IT"' IJ.BKV-.48KV B ~AE4 "i ism~~.~. •-<8

.. ~ • • !FIRE~ .-t •-< -~FIRE i ~< t C Bill C t AF 3 j PUMP : 2000A t C t c t 2000A : PUMP : v ~ ) NO i ~~~~ ! g ) g ) NO g ) I XfER ! J: BBFl 480V SWGR. -J: BAFJ : ! :£ 1· BBF4 4BOV SWGR ~ 1· Bf409 4BOV SWGR. ~ 1• 6AE4 ! IWCH j ¥ BUS "F3' ~ ! i -1- BUS 'f4'. "- BUS "E 4' -1- i, : 1 i r l ; I 1600Al j : [1600AI [1500AI i ! <SEE NOTE I J : ! ISEE NOTE I J j :...-·-··-·--·--··--·-··-··-··--·-··-··-··-··J ·-··--·-··-··-··-··-··- · ·-··-··-··-·--··-··-··-··-··-··-··-··-~

,. ______ ·-··-··-··-··-··-··-··-··-··-··-··-··-··-··-··- ·----·· i .Ac Wrl0~~~t 1 ~1st vA .Ac : ; ""'""" l•, 6GHZ '-A...V ! ! rr

8 l l .8KV- .48KV

8 ~ J

! "BF S' .l •-<, •-<c - l "AE6" l ! ~ r) ~r)NO ~ r) 1 i ~ ! BBfG 480V SWGR. ~ .j; Bf609 480V SWGR. ~ ! 9AE6 ! ! I BUS "F6" l BUS "E6" j • 11600AJ I loOOAJ I ! ISH NOTE II i ~---· · -··-·· -··-· ·-··-· · - -·-··- · ·-··--·--·-··-··-··---- - ·-··-!

ISEE NOTE I J

MAIN GENERATOR \06911VA 0.90 P.r. 25KV,l•, GOHI

,---·--· ----------------------------------.. : 8 1000/ IJJJ KVA : I •<J AA/FA eo•c RISE ! : "'-~ c Jo, 60HZ i I l'1 4.!6KV·.48KV •

i DF7 l ~ •·l j j < t 60F 7 c ! j ~ I) 4BOV SWGR. ! ! ~ BUS "F7" i ! ( !600AI j L_ ______________ <_s_:~_".?T~_n ___ ___________ __ j

UNIT SUBSTATION 'E3'

till.ill I . FOR 480V ELECTR ICAL SYSTEM ONE Llh'i DIAGRAM SEE

SHEET 2 OF TH IS DWG. 2. BUS RATINGS ARE INDICATED THUS 12000A I. J. FOR STATION OISTRIBUTION TRA NSF ORMER TAP SETTINGS

SEE SHEET l OF THIS owe.

4. MAK[ UP PUl-f' l«JTOR • I IS NEEOlD FOR "ENERClNCY FlED AND BLEED CO~ING". CER TAIN CONTROL COlol'ONEN TS ARE DESIGNATED AS QUALITY CLASS AO, REFER TO INTRA-COMPANY MEMORANDUM NEN 91 ·I 0215 'FEED ANO BLEED SYSTEM OES IGN CRITERIA' FOR FURTHER DETAILS .

5. KIRK K[1 INTERLOCK PRE VENTS BREAKER CLOSURE IF INTlRtOCK I NG BREAKER IS CLOSED.

REFERENCE DRAWINGS E-2 15KV & I l.8KV IUERING & RELAYING OtlE LINE DI AGRAM E-3 4.16KV METERING & RELAYING ONE LINE DIACRAM E·4 480V UNIT SUBSTATION ONE LINE DIAGRAMS

DAVIS-BESSE NUCLEAR POWER STATION AC ELECTRICAL SYSTEM ONE -LINE DIAGRAM

E -I, SH. I FIGURE 8.3- 1

REVISION 31 OCTOBER 201 6

DB 03-118- 16 DF N~I :/[l [C/E JSHl.DGN

olHE ES

:- il0HO

=<

48OV ESSEN MCC ''F I5''

t{0

il0Iu

HOTE

9

e

Ha

I

;

MCC"EF I 2D.

4BOV ESSEN MCC.,EF15.

'0'

Dt0)t'

I

)BEr

I 5{NO o

lr0

NOT q'0'3a

-d

8F I 50tH5

BEl50lL5

{ BOV MCC. F I ]..IURB. -OEII, AUX,

NO

6

r{0

E@ P3

il0

N9

i{0

N9

NO NO

H3

il0

i

SEciloil 'FzJA' _

@

sEcI Iolt'E?1S'

)frt480V ticc "F23'

SECT I0l't'F 218'

M SECI]OII'E?]A'

480V MCC "E23"

480v MCC "E22"qSOV MCC "F22,

SECT5ECrI0r{'E228'

Ao

NO

tt0

81 409

NO

HB

ti0

a€

tt0

Ao

Ir/0

Ete H3

lr0

H3 s3lr0

BB

NO

|:lgH@

r0:<

B3

NO

;E6

sEC r I oit'ElJr'sEcII0t{'FllA' 6<

48OV MCC.,E 3J,

SECTION SECIION'FllB' 'Eil8'<

./ E 480Vt 'Fj

lr0

H3bB

:

-ltU+

=*i=gi

4gOV MCC .E32.

SECTIori'tta'I0lr I2A. -

48OV MCC ''F 32.

* SECIl0ttH'FJ?B'

FRr,i 4, l6xv Es5Eil 5r6R BUs '01'(5EE NOIE I I

FR[ 4.16KV(

E55EN SYCR BUS 'OIsEE ilolt 1 )

Ffllt ,{. t6r(v(

ESSEtt SICR 8u5 'CtSEE IIOIE 1 )

FnH {.t6t(v E55EN 5r6E BUs 'Cl' FRr,r ti,8r(V 5[0R BU5 'B'{sEE NOTE ]) (sEE NOTE II

FRM IJ.B(V 5I'OR BU5 'A'' FRt.,t I].8KV sWR 8U5 'B'(sEE NOIE ]] tsEE NOTE I)

FRt{ 13.8(v 5t6F BUs'A'ISEE NOTE I]

ESSEN UNIT SUB"FI Y ESSEN UNII sUB 'E1, UNIT 5U8.F2.. UN I T SUB "E 2,'

I

I

I

I

I

I

I

I

I

I

I

Eir<:ctt

^<,1000 r(va550 C RI5r,60t12{. l6t(v-

5E

.48(v

I^<t

IrdC -L

I 000 (vA550 C RISI

I 000 rvA550 C RISE36,60HZ4. l6r(v- .48r(v

I 000/ I I 50 xvlOA/FA 55O C RISElr,60NzI l.8xv- -,l8xv.BF

2,,

1000/1 150 l{VAOA/FA 55E C RIsEld,60HzI l.8l(Y- . 48r(Y

I 000/ I I 50 l(viOA/FA 55P C RISElr, 60HzI l. 8KV- . 48r(V

"BE2"

I 000/ I I 50 KVAoa,/FA 550 C RISE16, 6oHZ1r,60HZ

4.151(|/-.48KV ir{ tIr{t

9

I J. EKV. , 4EKVI

I

I

I

I

I

I

I

I

.J

tYtc

'0Ft-2' ,,DF 1" tY"c

^Ytt'cE r -2" 'cE1-t" 'Yt

c

, AF 2,, .AEz. E

t{.il0

BDTI2 eNO

BCEI2 eE BCil 1 BBI 2g

il0

8AF?

[0

BBE2 ErEe80Ftt48OV SI{GR, BU5 tt 48OV SY1GR. SUS ,E

1 " 480v s.tlcR. BUS "Fe" 480V S|{GR. BUS "E2"

NO

EO

ilo t{0

FIto

FRolr 4.I16r(v smR BUs '0?'sEE HOIE I)

E@ E@Y UNIT SUB -F]"

I

I

I

I

I

I

I

I

I

I

I

Irdc J 1000/t3!J KYA

in/Fi 80q c RIs€16, 50HZ{. t6KV- ,48r(Ve e'0'

e a^Ytc

,,DF 7 "

48OV ESSENMCC,,F 16A

.fttx 480v uNEIEPTACLI EEI{CLOSURE B25R5501

48OV ESSENMCC

,,E I6A, -9 BI}F I

48OV S\{GR. BUS .F7,

MCC .F 4'480v E55EN MCC'Et4"

BUS ,.F 7'BF705

E@a4BOV ESSENMCC,.F I 68

. LS 48OV ESSENr,rcc"EI68"

H5I

x#

*7 tIRt -4 IEY ITRLK 480v r,icc "F?1"

*orou,rr* MCC'Fr2' 480v ESSEN MCC"E12's

a SECI ION'f I 28'

$cI lotr'E r?8' e - SICTI0llK 'El2a'

FFt{ tJ.8r(Y smB 8U5 '8'(stE ti0IE ll

Y

FRH 15.0r(V 5r0R BUS '['(sEE NOTE I)

YUN IT SUB ''EF6.'

^i*Lt 000/ il 5001./Ft 550to, 6fttz

t(vAC EISE

{ 8r(v

r 000/r r50or/fr 550lr,60fiz1 3,8l(V- .

Ivac RlSt

48t(V

'AE6 "

*Li. I

I

I

I

I

I

I

I

I

I

I

e e480v l',tcc "F2t" i

e{ t

6

I 1.8r(v.8F6" I{4 80V 48OV ESSEN MCC.EI I,, StcII0H'F2ti' = 5ECII0N:'FzrB' SECT 1oil

'F ?t c'

H

'E r 2C'

dEcr.'Er?E'

sEcr. 't I ta'88f6 8F609 8rt6

48OV SY6R. BUS,,F6' 48OV SI{GR. BUS ,.E6.

stcr. 'E I 20'

48OV MCC ,.E2I,. )Ea5E[I.'fil8' SECT,'F] SECI I 1D' I

sECT,'E I IB' SECr tU{'Ea l 0'

SECIlort'82 rC'

SECIIOI'E2tB';q 6

t0r{'E2la'

a480v

l|lCC -F61', 480v 480v

MCC ',F62" MCC 'F53',480v 480v

MCC 'E6t' MCC "E62"

NOTES

4MCC

80v'E6 3

FRH 13.8r(V sSR BU5 ',B'(sEE riolE r)

Y FOF. FRI t].6XY 5Y0fi 8U5 'r'rstt Ml|t t)

Fn[ t].fiv srcR BUs 'E'ISET NOTE II

@

FRII J.8[V SISR BUsISEE NOTE II

tEta E,8t(v 5I0E 8U5 'B'($t trolt t,

FRr. rl.8Kv 5r0R 8uS 'a(sEE l0rE t)t'l/c .2/0

UNIT SUBSTATION,'TF4'' UNIT SUBSTATION .'F3 UNIT SUBSIATION,.E3,

1000/1150 (va0A/FA 550C RlSEjr, EfiII 5.8r(v-.48r(Y

I 000/t I 50 l(vaoa/Ft 550c RtstJ6,60llI13.0rv-.40{v

1000/l 150 l(\iAOA/FA 55OC RISE16, 60{ZI 3.8rV-. {8l(V

I 000/t I 50 l(vroa/FA 550C RISI10,60fi2I l,8*Y-.18r(V

t000/t I 50 fivroi/Fa 550c RISE5!, 6012I t,8l(v-. 481(v

J

t000/il50 KYAoi/Ft 550c Rtst

1, FoR C0ililNuAil$,t 0F t3.8t(V & 4.15t(V oilt LIIE DIA6RAi{sTE SHEEI I OF THIS DTG.

BF]ld, 60HzI l. 8t(v-. {8t(Y AE 3

2. ONEAI(IR5 TITHOUI TUIOI,iATIC IRIPPIHG OEVICE ARE

tilotcalEo IHUS l.4 'AE4' .AF]. ir{

c

tr€lt'c 8Ina

a l. aLL 480v rcc BusES aPt 600a.

4, ALt UIIII SUBSTAIIOI{ BUSTS ARE 1600A,

5. FDB SIAIIOt{ DISIFIEUIION TFANSFORI,{R TAP sEIIINGs,sEE s}IETI ] OF THIS OU6.

6. BREAI(Ifl IRATT RAIIHC SHOIT.I. FOR IRIP RATIIIG 5TTAPPLICIBTT SHEEi OF E-4, t-5 OR E.6,

7. stzlr{o 0f cofl0ucloRs rxo PRoTEcilvE oEvtcES FoRTEI4P. IOAO5 TO BE PEff TIAIIOI.IAL ELETTRICAL CODE.

8, THERE IHIS NOTE 15 RTFEFTNCIO, IHE ORIG]IIAI ENEATER HTsBEEN RTPIACED UIIH A BREAITR OF GREITER FRAI,IE sIZE A5IIIDICAITD. IN IHESI APPLICAIIONS, IHE BREII(ER FRAHE SIZECAN IIOT BE ASsUI.{ED TO BE II.IOICAIIVE OF THE AITPACITY OF

assoct arto ctRcutT coilPorttlrrs.

B8F,{ BEtl

HO

ErFl

r{0

sotl BAES

48OV SI{GR, BUS,'F4'' qSOV SI{GR. BU5 ,E4.480v sHGR. BUs 'F3" 480V SWGR. BUS 'E3

I

NO

9. yHEnE ',o'/rto1 '0' BfffloiRlts iRE 0EPtcrE0 FoR {80vrc srcR,ELECIRICAL COIPOiIEXTS HOUSTO Tt{IIRELY YITHIII THE 5T6RCUBIETE sHALL BE COXSIDEFEO IO 8I IITH]N IHE O BOUIIOARY,FLEX AS$CIATED BEENI(ERs IET OPEN OURING IIORXNL OPERATIOHAIID I'IAY II+ACI OPEFAOILIIY IF CLOSED TTIEIT ASSOCIiIED BUsEOUIPI{I,II I5 III SERVICE.

e9*5u"PE!Io

E

I OUu-z<

,:* *-= il

T6F

2^62SE

!EY

6E

480v MCC 'F 4 t " c80v t,lCC 'E4t'!d

E-E!l

REFERENCE DRAI{INGSE-{ 4$0v urtr SuB5rrTtfrr oilE t ll{t otrGRrHS

E-5 480v rCC sysrEu 0r{ t-trE otrGErrE.6 .{8OV ESSENTIAL I.{CC STsIEI{ OI{T TIIIE OIAGRAH

SECTION,F{IA.

=sEcTIoil'F{18' SECIIOt,i.E{IB. 99 - 5tCIl0tl 'E{ll'

I-

s3FRI 4,t6r(v SmR 8u5 '02'

(SEE NOiE IJ

Y

FRr {. l6r(v S|CR BUS 'C?'{sEE NOIE II

LTG. OISTRIBUIION CENTER'F5' LTG. DISTRIBUTION CENIER .E5,

I .<'G

^Y'G

_t r'--'---'-"-"-"- Ir{c

t"tDAVIS-BESSt NUCLTAR POIlIER STAIION750 KVA 150 r(vr

ld,60Hi{. t6[v- {80Y/277Y

3s, 50Hl4. t6r(v- 480v/eI7Y

DF 5.. CE5 AC TLECTRICAL SYSTEi,1

ONE LINE DIAGRAM

E-I SH. 2

T IGURE 8.3.2

8DF5 BCE5

48OV LTO. DISiRIBUTION SIIIICHBOARD .F5" 48OV LTG. DISIRIBUIION 5I{ITCHBOARO

,.E5.

480v MCC 'F31' 480V UCC "EI|"

= sECTloil'FJ18' g SECIl0tt'E51['E@

b s

{@

-y 'c -!5 -!5 -5 -I -r -I Je JS Jgor e( -e -s -* -1e6 0- o@ o4 0L o[ oL

ae =u

-I-c-E-g€G oc o[ cr

c;tg

l- lo 16de a@ ilo

@

or or or,a,

REVISION 32

SEPIEI'.IBER 201B

5ECTIOII ''FJ]A' O sECil0N ',$r8'o

DB I 0-l 0-1 7 DFN=l r /ELEC/El 5H2. DCN

I ..

l/) => co _J 0 0:: 1-:z 0 (_)

0:: <( LLl '-" :::r:: (_) I-

3' l/)

:::;;: 0 0:: LL

U-Cl > LCl + N

BUS LOSS OF SYNCHRO CHECK

>loe BUS C1 a C2 BACK UP OC >I<

BUS C1 AUX. RELAY 51 -1 51 GS -1

PARTIAL DIFF. OVERCURRENT I

c1 a c2I TRIPPING I TRIPPING I >·>E )>.o( )>.o( >·

BACK UP RELAYS VOLT AGE ,-------A--, 51 -2 51-3 51 GS-2 QC

A1 3 A 1 2 2C DSA A1

A1 3 A 1 1 c

<1>----25P

TO SH.14C (86P2l

A13

A2-------<------4t--~

1 0 I CS 1 O 1 0 1 0 JCS

RESET PB

9 51-1X 11 'M co ICS

_ ___,a----, 1 0 c 1 1 2

1

l/) <(

LLl :::;;: <( l/)

l/) <(

LLl :::;;: <( l/)

A2 -------<------4t--~

co ICS

86-1 11 C'1 12

~--~'-~~~

A13 A2-------<---------------~

1 0 10 10 10 51 -1 x

1 0 ICS 1 0 1 0 I CS

C1 'M co

I·:~S2A !CS AC11 0

6 (SHT.6l A2

l/) l/) <( <(

LLl LLl :::;;: :::;;: <( <( l/) l/)

'M co JCS

l/) l/) <( <(

LLl LLl :::;;: :::;;: <( <( l/) l/)

co ICS

A13 A13 A10

30Al.0 f 30A A 1 3 A 1 1 2 1 2C

DSA A1 3 A 1

11 11 c

RES. 200

1 3

1 4

A 1 A1 3

TO SH.14C ( 86N l

8 51-1X 7 b I C1

51 -1 x C1

RES. 200

1 3

1 4

A13

8 86-1 7 b I C1

86-1 C1

SCHEME NO. AC103 (SEE NOTE 1 l

RES. 200

1 3

1 4

EQUIPMENT NO'S.

(FOR SCHEME AC103l 74V PART C1 OF SCHEME ~ ~ COT131 AL AL 1 SH. 21 A13-AC103C

A1 -AC1 01 A2 -ABDC1 A1 O-AC11 0

NOTES: 1. FOR SCHEME NO.AD103, BUS D1,

TRIPPING LOCKOUT a SYNCHRO CHECK RELAY LISTINGS SEE SHT.13.

2. FOR DISCONNECT SWITCH DSA DETAILS SEE DWG. E-30B SHT.20, FIG.5.

8 86-2 7 b I C1

86-2 C1

DB 11-15-10

A13 A10

2 51X AC11 0 2

8 (SHT.6l

A10 A2

9 52S1 b ABDC1

10 (SHT.4l A2 A13

7

8

86-1 C1

74V C1

94-1 13 94-2 13 C1 1 4 C1 1 4

. 1-:::r::

/ l/)

:z 0

' Cl LLl => :z 1-:z 0 (_)

DAVIS-BESSE NUCLEAR POWER STATION 4. 16 KV FEEDER BREAKER

BUS Cl TRIPPING AND LOCKOUT AND SYCHRO CHECK RELAYS

E-34B SH. 13A FIGURE 8.3-4

REVISION 28 DECEMBER 2010

DFN=F/SCHEME/E34BSH4.DGN

( I

V'> ::::> co _. 0 a:: 1--:z: 0 M <...> a:: (...!) 3: M VI

~ 0 a:: LL.

<...> Cl > I.(') N

•I• IND 1cmoN •I• MANUAL TRIP ·I JND 1 cm o~ I• AUTO TRIP .. 1 CLOSE BUS QC I XFMR QC I BUS UV

A2 A2 P2t AtO

BDCP41 tC

A2

MQ cs

OS

A2 -

2 cs 2C

A2

A2 At3 A2

A2 A2 At3 At iCI

2 CSID t t 25SD HS6221 2C · ABDCt 12

86-3 C2 2

86-3 -;;c HIS6220\ P32 P22 I

~ Ct 86-2 -Cl- 6 C SH . 1 4 ) 7 ( SH . 14 A )

5 2 7 Y - I I 2 7X -5 _C_t_ I-Ct-

25SC 6C 25SD DG1 GT DG1

?c1 Cl Cll I A2

A2._ __ -e----------e----uA2

C SH. t 5>

5t-2X C2

(E-32B) SH. t 4

Rt Al A2 A2 t 62 71 TD\ 2

95 AACC2 CSH.2)

A2

39 TDDO 0.8-15 SEC. ADJ. SET AT

52Stb ACIOI 5

Alt 6 (E-64B ) SH. IB

JUMPER

AIO AtO 52Xl I 0 52Slb

AACC2 9 ACl 10 C SH. 2> CSH.6>

AIO AtO A2

10 SEC. BG-!_ /E -328) 4 BO ~SH. 14 7A

52Hl 4 TEST

POS.

r-1'~-1~ p CLOSE : 52 t 4 I ---~-J DS 6

tCO CU P32, Rt, Gt, TRtl

AIO A2 ill

3 86-2 4

ct CSH.13> ill A2

0')') 0') I I '-'-' I '-I'

C P31, CL21, CL41 A2 CC>

Cll 1, CL3t TR, G, TRI

CO>

12 t t

A2

13152520 14

2 TOR

· 153 CSH.6) s2b I

ACl 10 54 .

AIO

0. 5 SEC.± I 01. NOTE 4

1

8 52510

BL I BL2

10 6 62 TDDO 15HZ

Cl

5

SCHEME No. ABDCI CHANNEL I START UP SYSTEM No. 004

WIRE PREF IX BOC EOUiPMENi NUMBERS A2 - ABDCl ~ - C5715 I

Cl - C3615 BLOCK DIAGRAM

SCHEME No. ABDCI *SEE DWG. 7749 E-22 SH.1 FOR CONNECTIONS

HA - HAAC HB - HBBD

• - .... - ....

OS BL5 BL6

/\ I CSID t ' / ' /

2 27X-4 A13

5 -Ct-

( SH. 13> A13

T~c ABoc1 Tc/ 6 ' /

Ct Ct

R

' Ct A2

52X ABDC1 Gt TRt t TR

A2 A2

OS TRI

OS

t3 r---1'~-I

52b I TRIP I 52 I

A9 - AACC2 AlO - AC110 A23 - AC203 A13 - AC103 Al - AC101

__ J

I 0

G rnt A2 A2 A2

86-4 80

11

(E-32B ) SH. t4

ill

74 NOTES: TD5DOZ 1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS I H SEE DWG. INDEX E-34B.

2. SEE SH.4 FOR CONTACT ASSIGNMENTS. SPARES AND SW. DEVELOPMENT REFERENCES.

3. FOR BREAKER INTERNALS SEE DWG. E-30B SHEET 16A. 4. TIME DELAY RELAY CTDR> DIP SWITCH SETTINGS ARE:

1 - ON 4 - OFF 7 - ON 2 - ON 5 - ON 3 - ON 6 - ON

52X OUTPUT CONTACTS TRANSFER UPON APPLICATION OF POWER. THEN RETRANSFER AFTER TIME DELAY.

DAVIS-BESSE NUCLEAR PO~R STATION 4. 16 KV FEEDER BREAKER

(BUS TIE XF~ BRKR. ABDCl C~TROL), SHEET 1

E-34B SH. 3 FIGURE 8.3-5

REVISION 21 NOVEMBER 1998

": ·-

cs P62 0 IR9·"s:.r 3•t3C P~2

~"' ·r::;;S1 a S2X TRsi TRa ... TR7 I 3-~ii.;'=---oo

. • • TOO TO BRKR AACC2 TRIP CRKT ISH.11

5251 b } TD BUS Cl BRKR

s~t6 AC101 CLOSE CRKT IE-648 SH. IAI

5251 b 9 ~ t 10 } TD BUS Cl LOCKOUT

RELAYS ISH. 171

5251 b } TD BUS Cl BRKR 1;t14 AC110 CLOSE CRKT

!SH. SJ

Si!llb } TD BUS C2 BRKR

S 8 !SH. I ) Tl'1':":18 AACC2 CLOSE CRKT

7

J 62 } Gl;DO C~9 TO BUS C2 BRKR AACC2

3 b 54 CLOSE CRKT ~)-o ISH. 11

S4

• 742 !743 YAN4 AN2 • 622 y623 4 2 41 2 4 21

, - 74 • r- _T 39 ~ , 62 • r-TDC TOO TOO I TDC TDC TOO

8 6 8 AN6 621 .

• * NOT TO BE USED

SPARE

Q '

o--.!.!i i!l--o SP11 0 SP12

o---!Eii!L-o SPIS SP16

o---!Ei"f!!--o SP19 SP20

0 SP25

SPARE 5251

> SPARE S2S2

b 0 ,~,16 0

SP35: SP36 17 18

sir,-"'~, '~bro 0 0

SP39 SP40 ,

9 o 10 TO UV RESET&: 94-1/DGl S2S2 }

S~~D IE-64B SH. 1EI

I 5~~2 SP24 PART OF SCHEIE :'.:2: -} ~ 2 Z413 SEE SH. 24

0 SP27

~D

7 PART OF SCHEIE S2S2b } t t B SP~B COT 131 SEE SH. 20

.,._!jf1...o} S~~< SPARE SHS SH6 52H1 O 111a O !TEST POSJ

SH7 SHB

o 3•1' o} SH11 S .& S~2 o--"'t r-<> SPARE

SH1 3 SH1 4 52H2 O 741 8 0 OEST PDSI

SH15 SH16

0 '•~c 0} CS3 CS<4

.,_2j i§f...o SPARE CSS CS6 CS o--!i i!£..o csr csa

ll-<'+A~~ ~~·~~

3r 'G....

All

303 39 5~

ANS

'

> SPARE 52 AUX

}

BRKR CLOSING SPRING FAILURE PART OF SCHEIE COT 131 SH. 21

O TL3JtTL4 O DS13 051'1 O TLS I l'TL6 D

0511 0512 O TL7ltTL8 O

059 0510 O TL9ll'TL10 0

057 058

o.!b!li .,I!Jl.o DSS DS6

.,.l!ll.j flill..o 053 054

.,..Iill.j tlliio 051 052

> SPARE DS

SWITCH DEVELOPMENT REFERENCE 1 ·FOR CS AT SWGR. SEE FIG 2, SH 9A, DWG E·30B 2 · FDR REMOTE CS SEE FIG 3, SH 9. DWG E-308 3 - FOR REMOTE zggp SEE FIG 4, SH 9A, DWG E-308 4 ·FOR OS SEE FIG 4, SH 10, DWG E-308

S ·FDR REMOTE H~~~~l SEE FIG 1, SH 10. DWG E-306

NOTES: 1. FOR GENERAL NOTES a LOCATION DESIGNATIONS

SEE DWG. INDEX E-348.

DB 05·22· I 2

DAYIS·IESS: lllllElll POIER SIAlllll 4. 16 lY FEEDER IRllER

IIJS llE IFll llR, •I IDHlll.1, HEI 1

E·.1411 511. 4 FllUIE l.H

REVISION 29 DECEMBER 2012

DFN •F /SCHEME /E34BSH4. DGN

(

V') :::::> co _, 0 0::: 1-:z: , 8 M 0:::

§i M V)

~ 0::: LI..

u c > IS') N

I •I• INDICATION •I• MANUAL TRIP .,JNDICATIO~~ += AUTO TRIP ... , CLOSE , .. BUS oc+Bus UV . GNO oc--1 -- PHASE oc ----i

JC

R2

cs ----..--.

AJO AtO

CCP41 25SO

HS6221 ~

--------.,...- CL3 J---<.i---¥1'-7-C ._ Al

39 TDDO 0.8-15 SEC. ADJ. SET AT 10 SEC ..

CL31

JUMPER 14

7A 52H1 TEST POS.

r-1'~_1.!.. p CLOSE : 52

14 I ---~-J OS 6

( E-648 )10 525 lb 8C 2550 SH. lB 9 AC101 j DGf""

AIO -----------u-- CLJ 1 C 1 AtO AlO A2 AJ3

52Stb 8 25X ABDCI 1 Cl CSH .. 2) CSH.4> C SH. 13)

A2 At3 AIO AtO

52S2a

2

13

14

3

4

6

5

' / R / '

52S1a

62 TDDO tSHZ

Rt

Ll3 SCHEME No. AC110 CHANNEL 1

START UP SYSTEM No. 001 VIRE PREFIX CC

c P32, Rt, Gt, TRll P 31 , CL 41 , CL 21

<C> AIO

BLOCK DIAGRAM SCHEME No. AC110

• -

Clt 1, CL31, P22 TR, G, TRI, P21

CD> Cl

cs

R6

R5 cs

86-3 C2

C SH. 15> 2 H 156223 \ P32

/\ ~ T~c

AIO P22

c 1 u---..----,

GI TRl 1 AlO AlO AlO

OS R7

R8

R9 OS RIO

OS

6 74

t3 r __ j'_l_ I

52b I TRIP I 52 I __ J

10

EQUIPMENT NUMBERS AlO - AC11Q ~ - C5715 9_ - C3615

TODO ISHZ

A13 - AC103 !1 - ACl 01 A2 - ABDC1

9

AtO 51-5

A13 ---+At

10 10 10

7 27¥-1 tl 27X4 er }_c_1_ 8 <SH, 14> 1 <SH.14Al

2 27X-5

eJB "( 0A <( <(

& & V"> V') <( <(

~ ~ <( <( 5 Cl

A13------A1 V"> Vl

AlO At3

86-2 _C_l_ <SH. 13)

Al3

NOTES:

co

6 SIX TDDO 15HZ

51-4 JCS 0A

co

10 I 0

"'8 f>C <( <t

& & V'I Vl <( <t

~ ~ <t <( Vl Vl

1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS SEt DWG. INDEX E-348.

2. SEE SH.6 FOR CONTACT ASSIGNMENTS, SPARES ANO sw'. DEVELOPMENT REFERENCES.

3. FOR BREAKER INTERNALS SEE DWG. E-308 SHEET 16A. 4. TIME DELAY RELAY <TOR> DIP SWITCH SETTINGS ARE:

1 - ON 4 - OFF 7 - ON 2 - ON 5 - ON 3 - ON 6 - ON

52X OUTPUT CONTACTS TRANSFER UPON APPLICATION OF POWER, THEN RETRANSFER AFTER TIME DELAY.

L L

OAV[S-BESSE NUCLEAR P~R STATl(JN 4.16 KV FEEDER BREAKER

(8L'S Ct & C2 TIE 8RKR. ACllO CONTROl.l, SHEET t

£-348 SH. 5 FIGURE 8.3-7

REVISION 21 NOVEMBER 1998

SPARE ~ 52S1a 52X L 9 L1 0 1 5 i...;.I 1 __ 6 .....:3;....il r!--

1~1 1-c__., 863A

52l> 57 58

Q~)-o

CL31 622 I o

TOO CL41

52b 53 54

C~>-

62 1 I TOO

TOO

TO BUS C2 LOCKOUT RELAYS ISH. 15 l

TO BRKR AACC2 CLOSE CRKT <SH. 1 l

} TO 8RKR ABDCt CLOSE CRKT <SH. 3 >

SPARE

TO BUS Ct LOCKOUT RELAYS <SH. 13 >

__!j dQ_ TO BUS C2 LOCKOUT 52S1a } --, ..------- RELAYS !SH. 15l

52510 } TO BUS C2 8RKR --1, t-L- AACC2 TRIP CRKT <SH. 1 >

3~3 BRKR CLOSING O SPRING FAILURE SP17 PART OF SCHEME

52Slb } TO BUS C2 BRKR 174 t1 8 0 AACC2 CLOSE

SPt 8 <SH. 1 > 39 5~ COT 131 SH. 21

ANS

* 742 1743 ? AN4 4 2 41 2

74 39 TDC TOO TOO TDC

8 741

SPARE * NOT. TO BE USED

ANG

52Stb } TO BUS C1 BRKR 5 ~ t 6 AC101 CLOSE CRKT

< E -648 SH. 1 A >

__L ~ TO BUS Ct LOCKOUT 52S2a } --, ..------- RELAYS (SH. 13 l

9 52s2a }TO UV RESET a

rl~ 94-1/0G1 -.1 SP29 SP30 < E -648 SH.

13 b1 4 } SPARE o H o s2s1 SP13 SP14

0 SP23

0 SP27

3 b 4 ~t $~4

7 b 8 :1-t S~8

0 11/~12 0 SP31 SP32

b 0 1~~16 0

SP35 SP36 b

0 1lt20

0 SP39 SP40

SPARE 5252

S2St b } TO BUS Ct __ 9 ~1 u,._1 O_ BRKR ABOC1

H CLOSE CRKT !SH 3 l

~~ SH3 5 6 SH4 o--=-{ F-o SPARE

SHS SH6 52Ht ~ !TEST POS>

SH7 SH8 0 3:f.t4 0

SH11 S 6 SH12 o--1 J-2--o SPARE

SH1 3 7 8 SH1 4 52H2 O :H o <TEST POSl

SH15 SH16

OS 1 0$2 SPARE 0 L4 :f-t'-3 0 }

OR201 ~ OS DS3 DS4

c$.t~ CS4 CS3 ~~ SPARE

CS6 CS5 CS o&.£,~

CS8 CS7

3C 3 TR~~2 o1Lf~

~~

$..t~

~~

o1Lf~

~~

$..t~

52 52 a 51 51 0-(f-I ~)-0

~~aJS~

52S2a 17 ~ Q2H2 SP38

1 ~

SPARE cs

HIS6223

SPARE cs

AC110

SPARE 52 AUX

PART OF SCHEME Z413 SEE SH. 24

NOTES:

SWITCH DEVELOPMENT REFERENCE 1 - FOR CS AT SWGR, SEE FIG 2. SH 9A, OWG E-308 2 - FOR REMOTE CS, SEE FIG 3, SH 9, DWG E-308 3 · FOR REMOTE 25SD SEE FIG 4, SH 9A, OWG E-306 4 - FOR OS SEE FIG 5. SH 10, OWG E-308 5 - FOR REMOTE H~~~~ 1 SEE FIG 1. SH 10. OWG E-308

1. FOR GENERAL NOTES a LOCATION DESIGNATIONS SEE DWG. INDEX E-348.

OB 05-18-10

DAVIS-BESSE NUCLEAR POWER STATION 4.16 KV FEEDER BREAKER

(BUS C1 & C2 TIE BRKR. AC110 CONTROL), SHEET 2

E-348 SH. 6 FIGURE 8. 3-8

REVISION 27 JUNE 2010

DFN=F/SCHEME/E34BSH6.0GN

,--·''\ ~h· l\il.';'l_

\J 0 >

Sl-3

Al~ AIO

' $111. a ~SM•~>

.u. 5'.~•b iAcFt()>l.•0)

Al. Al~

._...,.._;;~~~-+~--....-~~~~~~~~~~~~~~~~-"

11 SE'£ t,v-14 ,14~-E-2'% ~II I (~2) F"OR ':>YMC. ... ~"41?~"­D~TEC.TION C~l<.T'!.

EQU~~~~1oi~~Me.ER~ FOR

~- A.01C13 ~ - AA.COi ~- AOllO

I 6C..-\ l 0.-

74V

8

~ 01

-O-I - ,.~lt..T OF' s.<:.~l~Mt o-~--U-L-<) C.OT s 31 "'- ~· 31-\.al

ti OT&~

I, t='OR. G,l!.'-'ltR."'- NOTE-. ~ 1-0ClioTION D~l(Ol<b,.TION!> ~~ t>NC, ti..iOE.l!. S:.·l4~

2. FOR 5;::.C.l'E ACI03,6:J5 (1, SEE.~ U•6 511. 13,l.

DAVIS-BESSE NUCLEAR POWER STATION

4.16KV FEEDER BREAKER ESSENTIAL BUSES TRIP, LOCKOUT AND SYNCHRO-CHECK

RELAYS, SHEET 1

E34B SH. 13

FIGURE 8.3-9

REVISION 18 OCTOBER 1993

tr) C>

' "" ' N -

1· POWER SUPPLIES

(l t l l - 7

~

I"') 27-2 I"') 0 0 mon u c:::::i <( 8 <(

I"') <:t: r0 . ..-- 7 7 :r: .

V> :::c 27-1 27-3 V> :::a: :::a: C1 W1 l ~) 0 0:: 0 8 0:: a LL.. LL.. Cl c:::::i w w => ::::> z: z: I- -z: I-

::z: 0 0 u u

·1· l l

7 27-4 ~)

8

11

1 0 12

l <NOTE 31

27-1 11 Cl <01 l

10 12

81 27X-2 84 Cl Wl l

UNDERVOLTAGE

l l l <NOTE 31 <NOTE 3l

27-2 11 27-3 11 Cl <01 l Cl (01 l

10 12 10 12

81 .

B 27X -1 4 CHDll

·1· UNDERVOLTAGE AUX.

T11 27X-2 MT Cl ( Dl I

Ti 27X-1 <NOTE 3 l Ml ITTI5Tl

27-4 C1 (01 l

13 27Y-1 27Y-2 27Y-3 14 Cl <01 l 14 Cl !D1 l 1 4 C1 (01 l

... I.. INDICATION .... I

~~~~~? A~~~3~ _____ 1 I ) I -= nl 21x-1 nl ;1x 2- 1 t < i

C1 ( 01 ) M3 C1 ! 01 ) I

-:::c V">

::z: 0

Cl LLl => :z: 1-::z: 0 u

I I I I I I I I I I I I I I I

J-L-~~~---~~---~~---~~---~~~~~~--~~~~~~~~~~---~~~~---~~~--~~~1--~~~~~~~~~~~----...._~--+I~~~~"'--/ I SCHEME NO. AC103 ( AD1 03 l - - - - - - - J

27Y-1 C1 W1 l

I CONTACTS

~~

~~

-I,~

~~

_!J, ~

27-1

FUNCT! ON

SPARE

OPERATE 27X-6

Cl <Dl l RELAY TRIP ITRLK BRKR ABDCl

! AACD1 l TRIP I TRLK BRKR AC110

!AD110l SFAS SEQUENCER CH. 1 (CH. 2 l

SPARE

27-2 27-3

n 13 15 n 13 15 n 13 15

SPARE

OWG. REF. THIS SH .

SH.14A

SH. (3l 9

SH.5 ( 11 )

E-64B SH.17

27-4

n 13 T15

I 27Y-2 I C1 (01 l

'ONTA°'" I DWG. I I l. l. I) I I 11 "' REF. I ~~ SPARE THIS

SH.

~~ SPARE AA ,_

~~l TRIP I TRLK t '/f-49B) BRKR AC105 SH 1 B 1

'" ---.. ( ADl 05 l

-I,~ TRIP ITRLK E-52B BRKR ACl 11 SH.SB ( ADl 11 l

~~ TRIP ITRLK E-528 BRKR AC112 SH.GB ! AD112 l

_!J, ~ SFAS SEQUENCER E-64B CH.3(CH.4l SH.17

T1 Rj 27X-1

A A Tµ 27X-2 M4 Cl (01 l M4 Cl (01 l

\ v I

RELAY TEST. TS1 -4 /Cl <01 l (SEE E -2048 SHT. 1. FOR Cl l (SEE E -2068 SHT. 1 • FOR Dl l

I 27Y-3 I C1 (01 l

jcoNTACTsl

I 1 2 j I~ r:-----

~Jl-

~.~

~~

-I, t!-~~

_!J, ~

FUNCT! ON

SPARE

TRIP ITRLK BRKR AC109

{ AD109 l

SPARE

TRIP ITRLK BRKR AC107

{A0107)

SPARE

SPARE

OWG. REF.

E.,488 SH.11B

E-488 SH.GB

THIS SH.

27X-1 27X-2 C1 ( D1 l Cl W1 >

~IM2 T2I~ 27X1 2 \'----------v---___ __,/ 27X26

BUS C1 (01 ) AUX. UNDER VOLTAGE RELAYS

E-648 SH.1E!2U

NOTES: 1. FOE GENERAL NOTES S LOCATION DESIGNATIONS

SEE DWG. INDEX E-348. TS

2. FOR UV DEVELOPMENT, SEE DWG. E-308, SH.11. FIG.6 AND FOR CONTACT FUNCTIONS SEE DWG. E-348 SH.148.

3. SEE DRAWING E-22. SH.1<2l FOR RELAYS 27-1, 27-2, 21-3 a 27-4.

0 AVIS-BESSE NUCLEAR POWER ST A TI ON

4. 16KV FEEDER BREAKER-BUS Cl (DI l VOLTAGE ANO AUX RELAYS

E -348 SH. 14 FIGURE 8.3-10

REVISION 25 JUNE 2006

Q DB 05-01-06 DFN F:/SCHEME/E34BS14.DGN

(

OS , ..

OS

R2 Rt

cs JC

OS R4 R3

VI :=I al

-' C> c:: I-:z: 39 8 M TOOO c:: 0.8- CLI 1 <..!) ;,.. M 15 SEC. VI

::E ADJ. JUMPER C> SET AT c:: LL. 10 SEC. <..> TA 0 > 3 '° 52Hl N TEST POS. 4

r_15_!!.. ~ CLOSE I 52

14 I I ---,;:i;-J

IOA OS 6

(-)

* SEE OWG. c I~~~ 1 E ;2~) .3C2 (f) P41, CL2t. FOR CONNECTIONS 3CN m> ~~~j R, G,

-- . -B-- __ P22JR1 ""A _A._]J. <EJ ...___~ * <A>

BLOCK DIAGRAM

CLOSE ·1· INDICATION .. ,.MANUAL ... l=:x= •I• BUS oc •I• TRIP AUTO TRIP

~ FEEDER OC ·I· FEEDER GNO ------------ -------------, A

P41 <l.~ R6 OS cs R5 2C A A cs ' /' / A 21 6 R Al3 / '/ ' P32

A ~ 94-1 CL21 ~ 6

<SH.13> I ~ A13

T~c ~ A

~

10 50/51 SOGS 10 10 10

ICS lCS SOGS

"° fllC """ """ 13 & & 12 V'I (/') ' ICS co """ -4 j ITH UJ UJ ::E ::::E """ -4 VI (/')

I IT

R G TR21 A A A

LI R9 OS OS JUMPER L2 RIO R7

OS R8 CLI

2

FOR SCHEME~ ACl2CE 8i : ADI IDF ONLY I

' ' ----------......-,,_,, r l ,_ ____________ : 2 1 2

' ' JUMPER A FOR SCHEME ' - - - - - - - - - - - - - - - -

ONLY : 7 CL

ACI ICE 8r ADl2D7_ I '---e---+------i~~------~-t-------' I

SCHEME No. <SEE TABLE>

6

5

t3 r __ _19_ I

52b I TRIP I 52 I __ J

10

'

74 TODO 15HZ

,--------- --.------~-~-~--~-~8--1 SOGs PO~R - SUPPLY

50GS ~ ~ :-----------------------------

! 1 1 ! NOTES: 16 15 14 1· 1. FOR GENERAL NOTES 8 LOCATION DESIGNATIONS

SEE OVG. INDEX E-348. I- -- -- - -- --' 2. SEE SH.17 FOR CONTACT ASSIGNMENTS, SPARES AND

SW. DEVELOPMENT REFERENCES. 3. FOR BREAKER INTERNALS SEE owe. E-308 SHEET 16A.

- ---- --- ----- --- --- --- ---- -

Sc EME UNIT START WIRE :0. UBSTA UP CH. PREFIX Q NO. SYS. ~ ..li:,l EQUIPMENT NUMBERS D A A ---------.-----~ ~ A C B X A!3

DAVIS-BESSE NUCLEAR POW:R STATION 4.16 KY FEEDER BREAKER ESSENTIAi. lfili smsunm.s Et • Ft cONTRU.

ACI ICE El 005 XtE HIS6226 ACl2CE El 005 X2E

-x'-t+-AfH-HJIF----l-F-t-- --005_......_..,_._~,.__ .. n-1

AOl2DF Ft 005 2

ACICEll C5715 XCE11 ACt03 SHEET 1 E-348 SH. 16 FIGUI 8.3-11

REVISION 23 NOVEMBER 2002

owe- E-?to& "!!!!»"'4,TC.H OEVELO"'F"'N\ti.""T RE~l<.i;.NCL

\- Foa c.'!:t AT s~GR , :::,,ke- ~le:. z. 1 ~~A ,owe, ~-301 ~- t=O~ tiit.E1'40TCi c.~, s;,e. FtC- t t SHq ,PNC. £.-~Of ~- J:"oe o~ 11.•£ i:-ac::;; s ., .... 10 , s:>wc. E- :.o e

I )

•Nol~;°

I - ~vst Et(N£a''"" .... oTi., ( t..OC.~, 10 ... Ol.~\~"'4AT\OM" ~lf. owe... '"'o&"' £. '\4t>

DAVIS-BESSE NUCLEAR POWER STATION

4.16kV FEEDER BREAKER - ESSENTIAL UNIT SUBSTATIONS El AND Fl CONTROL, SHEET 2

E348 SH. 17

FIGURE 8.3-12

REVISION 9 JULY 1989

Removed in Accordance with RIS 2015-17

DAVIS-BESSE NUCLEAR POWER STATION AUXILIARY BUILDING SECTIONS

FIGURE 8.3-13

REVISION 29 DECEMBER 2012

118 llli-29-12 lfl•JGIUSMIJlflGlllJ.IGllltll

4.16.KV ESS£N SWGR. BUS 'Cl'

760

TO STATION COMPUTER

2000•5 BCE 11 2000:5

TO STATION COMPUTER

--<

--<

FUTURE 600A

FUTURE 600A

3-4/0 AWG. !CUI FRM ABOVE

141

3·350llClllL !CU I 600/460

M. C.C . 'El5'-~I-++-<+-,..-...~ I 151 FRM ABOVE~ 600/540

~[f~: .. ---"'i cE:--!"~ ICTMTSE~IRNiTL! Ill FAHi BE105 300:5

111

9-l50KCNIL !CUI fRM ABOVE~ 6001600

M.C.C.'El1A' • (~~ 8£106

6·500KCMIL !CUI FRN BELOW~ 6001600

Ill M.C.C. •EllA' .. ---"'i C+-~ B£10T

6·500KCl4IL I CUI FRM ABOVE~ 6001660

M.C. C. 'EHA" .. ---"'i C+.-,..-...~ BE105

6·250KCMIL I CUI FRM BELOW~ 6001600

M. C.C. 'E22A' • C~,-,.~ BE206

6·500lCMIL ICUI FRM BELOW~ 6001600

Ill M.C. C. 'E21A' .. ---"'i :+.-l°"'l...+ 8£207

(1]

3-410 AWC. !CUI FRM ABOVE

BE109

C5 P1of' I BEii i

NO 300:5

ESSEN 480V UNIT SUB "EJ"

14l

15J SPARE 600A FRAIE

CRO TRIP --<+-,..-...~ BIUHR 1 BE109

3·410 AWG !CUI

161 POl.lR CRANE FRM ABOVE~ 600/300 MANUAL XFER • CE-~

SWITCH 04603 8£210 ND

3·l50CCNIL ICUI

171 FRM ABOVE~ 600/JJO

CROc~oJ • ---"'i (~,..-...4 BE211

181

191

I IOI

!Ill

Q

181

191 M. C.C. ·r13A"

6001600 SPARE--<< >

--<

6-l50KCMIL !CUI

BE 113

FUTURE 600A

FRM BELOW~ 600/660 . (~,.......~ BE21l

NO

l·500CCMIL ICUJ FRM ABOVE"""\_ 600/600

!IOI M.C.C. 'F22' • ~ C~

6·l51JlCMIL !CUI

BE214 NO

FRM BELOW~ 6001600 11 l l M.C.C. 'F21A' • ---"'i CE-"'~

BE215 NO

I 121 NETERIMG 1161 St:E NOTE 2

<131

11 71

1000:5 BCEl2 2000:5 NO

1141

l-llC 500KCMIL ICUI~ 6001600 (15J M.C .C. "El6A' .. ---"'i (~~ 118J

1121

llJJ

(141

1151

BEi 18

METERING 1161 SEE NOTE 2

FUTURE GOOA

1171

<181

200Q•5 2000:5

76'1

XFMR 'CEl-2" 3 •. 60HZ 4.1611V· 0.48J(V IOOOKVA DA 55'C I 120KVA OA 65'C Z•5.96Y. ON IOO OIC VA BASE

ll.8!V SWGR. BUS '8'

~ ~ [ ~ XFMR ·eer

10001115111\YA: OA/ FA; ;s•c I 12011288KYA: OAIFA: 65'C Z•6.91X ON IOOOKVA BASE l PHASE, GOil! IJ. BKV DELTA TO 480VOLTS WYE

RELAY ANO INSTRUMENT TABLE DEVICE OE SCRIPT ION FIMCTION

A AMMETER v VOlTIUER ® TRANSFER SWITCH 27 UNDERVOL TAGE RELAY REMOTE ALARM

!>IN NEUTRAL OC RELAY TRIP CORRESPONOING HIGH Siil!'. FEEDER BREAKER

501GS GROUtll SENSOfl RELAY REMOTE ALARM 51 OVERCURRENT RELAY ALARM MOTOR OVERLOAD

.!. Alll£TER W/ 5:0.02 A AUX. CT.

@ill I. COM'Af!TMENT NIMBERS A1£ IN PARENTHESIS . 2. ALL RELIYS ANO INSTRUIENTS TO BE LOCATED IN

COMPARU(HTS Ill ANO 1161 . 3. DELETED

4. INSTTU4ENTS NOTED WITH ASTERISK I •I ARE LOCATED IN THE IRE MOTE I CONTROL ROOM.

5. CIRCUIT BREAKER FRAIE Sill AND TRIP RATING FOR THE TRIP UNIT ARE SliOllN AS FOLLOWS:

6001300 FRAME sm--1 '-LONG-TIME DELAY PICKuP SETTING OF

TRIP DEVICE 6. CABl.E SIZES ARE BASED ON THE REOUIRED AMPACITY TAKINC INTO

ACC<WT THE DERATING FACTORS ACCORDING TO IHE ROUTINC OF T<E CABLE IN DUCTS, CONOUIT ORIANO TRAYS.

1. ALL FUSES ARE TO BE SHAIOOT AMPTRAP FORM 600 CURRENT LIMITING FUS£S.

B. DELETED 9. BUS H~OMING & TIE BREAKERS ARE EOUIPPED WITH 'POWER SENSOR'

TYPE PSI -A OVERCURRENT TRIP DEVICES. 10.FEEOER BREAKERS ARE ECIJIPPED WIT< 'SST' OVERCURRENT TRIP

DEVICE WITH INTEGRAL GROUND FAULT PROTECTION ELOOT. II.FACE OF SOCS RELAYS ARE LABELED "NOT USED PER FCR 79-223' .

THE RELlTED er s ARE SHORTEO AT TERMINAL BLOCK . 12.0ELETED 13.COM'ARllENT 8 Of UlllT 51.6 El C<JITAINS SIOl.E DETECTOR 058600:

COllJ>ARTMENT B OF UNIT SUB Fl CONTAINS SMOKE DETECTOR DS8601 •

.& 14. rnrnoT!~t ~~l~~L~~Y~R~'. ~~~O~:t~~\~~o\~HCTIONS CCilf£CTED

15. '11\iERE 1"0' I NOT "O"• BOUMJARIES ARE DEP ICTED FOR ~80VAC SWGR,

ELECTRICAL CIN'Oll:NTS HOIJSEO ENTIRELY WITHIN THE s,.,;R CUBICLE SHALL BE CONS IDEREO TO BE WI TH IN THE 0 BOUNDARY. FLEX ASSOCIATED BREAKERS ARE OPEN OUlllNG NORMAL OPERATION AHO MAY lll'ACT OPERABILITY IF CLOSED illjEN ASSOC IATED BUS EOUIPMENT IS IN SERVICE.

TO STATION COMPUTER

480V UNIT SUB "E2"

IJ. 8lV SWCR. ll.8KY SWGR. BUS 'A"

~~OCAIED ~ C3610

!ii 8 l fMR ' Aff ;, ,6c 1000111 50ICVA1 OAIFA; 55°C

181 SEE NOTE IJ

I I 20112881VA: OA!f A; 65°C ~ ·~H~t ~oi\~OIJlYA BASE 87n '~c , l·l50KCMIL ICUI

FRM ABOVE°'\ 8001600

!121 IETERING 1161 SEE NOTE 2

6·350KCMIL !CUI FRN ABOVE°'\ 8001600

. A-f-11•

c

BUS "B'

[ -!"! ~

~

13.BKY DUTA TO 480VOllS li1'E M. C. C. 'EllA' • ---"'i C«+-l°"'l...+>+ ! SI 191 M.C.C. "FllA" • ---"'i (~~4>+ lilt 51 N l-----f.. 400 •5 BEJOS BE31l

NO

160011600 160011600 ..... ~-+T"f-l~«+-,.......~>+'>-t"T'1~~-i~'-21..._~~~~~~~~~~~~-i~~~~~~~~~~~~~~--1~~~~~~~~~~~~~~--1 ...... ~~~~~~~~~~~~~-t-1-11.1_.~M--<·«~~>+·>-+......t.-.~~

1000:5 BAEl 2000:5 SEE 2000:5 BBE3 2000 :5

3·4/0 AWG ICUI FRMA~OVE

AUXILIARY DCKSllC 8001160 HOT WATER HTR «+-,..-...~>+

"'12l B£30l

6·350KCMIL ICUI FAM ABOVE~ 8001600

M.C.C. "El2A• • (i(~~>+ BEl06

6·350KClllL ICUI FRM BELOW°'\ 8001600

Ill M.C.C. "E31A' • ---"'i CE<+-~>+ BEJO!

l-410 AWC. ICUI FRMBE~OW

NOIE 14 NO

eoo1192 !61 FD~~~:~ 150 ~+-,..-...-+>+ I

MP0791 BE~IO 250: 5 J·250!CMIL ICUI

FRM ABOVE~ TURS ROON 8001400

F~~~~~Nl~~ .. :«+-~>+ lfER SW 05462 8011

NO

480V UNIT SUB "E3"

6-l50KCMIL !CUI FRN BELOW°'\ 8001540

llOl M.C.C. 'F32A" • ---"'i ('lo<+-~>+ 8£314

llO 6-l50KCMIL <CUI

FRN BELOW""\. 8001600 1111 M. C.C. 'FJIA" ,. ---"'i (~+-,..-...~>+

BEll5 MO

1141

I 151 --<

FUTURE 600A

118l

XFMR ·au· I000/1150KVA: OAIFA : 55•c I 120/1 288KVA ; OAIFA : 65°C Z•6.65Y. ON IOOOKVA BASE l PHASE , 60!iZ I J. BllV CELT A TO 480VOI. TS WYE

REFERENCE DRAWINGS E·I AC ELECTRICAL SYSTEM ONE LINE DIAGRAM E-2 MAIN ONE LINE DIAGRAM E·l 4.16KV ONE LINE DIAGRAM E·5 480V MCC SYST EM ONE LINE DIAGRAM E·6 480V ESSENTIAL llCC SYSTEM ()t£ LI NE DIAGRAM

DAVIS-BESSE NUCLEAR POWER STATION llE II BUSES 480V UNIT SUBSTATIONS

ONE-LINE DIAGRAM E -4, SH. 1

FIGURE 8.3-14

REVISION 31 OCTOBER 2016;

OB 09-01&-1 6 OFN• l : /ELEC/E4SH l.O~

4.16. SKV ESSEN SWGR. BUS "DI"

~

ro SlATION COMPUTER

~1r r~ ~~~i- 1 • ~ •<J" 4. lliXV·O. 48KV ~ C IOOOCVA OA 55°C e J! ~~~~ g~ 65°C "?'' IOOOlVABASE

76n

2000:5 BDFll

13. B!V SWGR. BUS "A'

TO SlATION COMPUTER

2000:5 BAF2

TO STATION COMPUTER

NO

--< FUTURE

600A

2000:5

Ill

121

:;~~:,~· =\ r~~ .. Rm~Mm ~

ZSR3603 BFI06 J 3-SOOllCMIL !CUI

600/540 ~RM ABOVE

N.c.c. "Fl2B" +-"'-+

M. C.C. 'E2lA'

BFIOT

6-500llCM!L !CUI FRM ABOVE~ 6001660 • ~:E-l'"l...+

BF205 NO

6-250KCM!L ICU! FRN BELOW~ 600/600

M.C.C. 'EnA' • CE-~

l-l50KCMJL I CU!

BF206 NO

B00/600 FRM ABOVE~

M. C.C. 'EllA' • (~E-r'\-+» Bf 305

NO

141

151

171

3-410 AYG. ICUI FRM ABOVE

6001600 SPARE (-r'\-+

BFI09

cs p~ 2

SEE NOTE 11 *

BFlll NO

l00:5

ESSEN 480V UNIT Sl!B "FT

141

151 SPARE 600A FRAME

CRO TRIP --<~ BRmtR 2 BF209

3-4/0 AWG !CUI MAlfJAL XFER FRM ABOVE~ 600/300

161 SWITCH 04603 POI.AR CRANE • (E-r'\-+

ALT. FEED Bf210 NO

l-JSCl\CMIL !CUI

CRD fD 2 FRM ABOVE~ 600/600

171 (4605 • :e-L"~ BF211

480V UNIT SUB "F2"

151 B00/600

SPAR£-<~.-~» BFJO~

IBI

19)

3-250KCMIL <CUI FRM ABOVE~ 600/600

M.C.C. 'Fl3' ----~_..,-<:-~ BFllJ

NO

6-SOOKCMIL ICUJ

I 101 M.C.C. 'F12A" :RM ABOVE""\,,(~ Bf 114

6-SOOKCMIL ICUI

M.c.c. 'F llA' FRM ABOVE~ 600/600 • :~-+

BF 115 1111

Q

161

6·350KCMIL ICUI FRM ABOVE~ 600/660

191 M.C.C. 'F2lA" • ~ (~

I 101 M.C.C. "F22'

(Il l M.c.c. 'F21A'

181 SEE NOTE ll E-4, SH. I

BF213

J·SOOJICM!l !CUI FRM ABOVE~ 600/600 • (E-~

BF214

6-350CCMl l ICU! FRM BELOW~ 600/600 • (E-~

BF215

6-l50KCMIL CCLII fRM ABOVE ' 800/600

l~I M.C.C. 'FllA' • ~ (K.-r'\-+~ BFlll

1121

1131

1141

1121

llll

1141

1151 --<

1121

<Ill

METERING I 161 SEE NOTE 2 E-4, Sil. I

fl))

XFNR 'DFl-2' 3 o, 60HZ 4.16KV-0.4BKV IOOO!VA DA ss•c I 120KVA DA 65°C X•5. 75X 00 IOOOlVA BASE

2000:5 BOFl2 2000:5

1161

METERING I 161 SEE NOTE 2 E-4, SH.I

1171

2000:5

FUTURE GODA

(181

METER !NG 1161 SEE NOTE 2 E-4, SH. I

NO

I l. BlV SWGR. BUS 'B'

[ -~ ~

~ KFll! ·ar2· 1000/I CSOKVA; OA/FA; 55°C 1120/12BBKVA; OA/FA; 65•c Z0 6. ~51. ON IOOCl\VA BASE l PHASE, 60HZ ll.BKV DELTA TO 480VOLTS WYE

BBF2 2000:5

13.6KV SWGR . BUS 'B'

=[ a IE .be .;,

B Bin A-fCH1·

c Bin

XfMR 'Bf l' 1000/1 ISOKVA; OA/FA; 55°C 1120/IZBBKVA; OA/FA; 65°C 1•6. 72r. ON IOOOCVA BASE J PllASE, 60HZ ll.8KV OHTA TO 4BOVOLTS WYE

·~~,....--1~1-11 _________________________ --1~--------------------------1-----------------------------1-----------------------------t•'-'7-1 ..... ~r-f-<·4<~>+·~"T":t""---""""'

MECHANICAL HOGGER NO. 1-1

6-l50KCMIL ICU! FAM ABOVE~ B00/600

M.c.c. 'El2A' • (~E-r'\-+» Bf306

NO

6-l50KCMJL ICU! FRM BELOW~ 800/540

!IOI M.c. c. 'F32A' • (E<-"-+>+ 1141 Bflf 4

2ooo:s B~~J zooo:s 00~p 14 51 2ooo:s sari 1ooo:s

J-410 AllG. IClll E-4 SH. I FRMBE~OW 800/192

161 FO ~ \!':~ 1~0 ~-r'\-+» NPOTn Bf,110 250:5

6·J50KCM!l ICU! FRM Bl:LOW~ B00/600

Ill M.C.C. "EllA' • ~ :«E-r'\-+» BFJOl 150:5 BFJOI

6-l50JICM!L I CU! J-500llCMIL <CUI

FRM BELOW~ 800/600 FRM ABOVE\_

1111 :«.-~» 1151 800/600

M.c.c. 'FJIA' • M.C.C. 'M22A' • v (K~-+» ( 181 BFllS PSF EMERG Bfll 8

3·250KCMIL ICUI FRM ABOV£~

TURB ROOM 800/400 I 71 CRANES MANUAL • :«.-~»

XFER SW 05462 BF311 ~ NO

• 480V UNIT SUB "F3"

NOTES I. FOR t«lTES , lEGENO ANO REFERENCE DRAWINGS SEE OWG. E-4 SIHT I.

2. WHERE "O' /NOT 'O' BOUNDARIES ARE OEPICTEO FOR 4BOVAC SWGR, ELECTRICAL COJoPONENTS HOUSED ENTJREL Y WITHIN THE SWGR CllBICLE SHALL BE COOSl!l£REO 10 BE WITHIN THE 0 BOIMOARY. FLEX ASSOCIATED BREAKERS ARE OPEN DURING NORMAL OPERATION ANO MAY IMPACT OPERABILITY IF CLOSED lll<EN ASSOCIATEO BUS EOUll'MENT IS IN SERVICE.

DAVIS-BESSE NUCLEAR POWER STATION 11 F11 BUSES 480V UN[T SUBSTATIONS

ONE-LINE DIAGRAM E -4, SH. 2

F I GURE 8. 3-1 15

REVISION 31 OCTOBER 2016

DB 09-06-19 DF N=l:/ELEC/E4SH2 .0GN

Xf Mfl 'A( 4'

l). BKV SJGR, SUS T

9

10 STA' ION COMPU][R

SEE NO TE l,5H. I

l fMR "ilfl ' l • • 61Jil 4. lliltY-0.48KY 1000/lllllVA AMf A BO'C X<B.01. ON I DOOKVA 8AI£

1000A

Z000:5 BAE4

l -500KCMIL ICU> FRM ABOVE

BEm SEE NOT E l , SH. I

4. IOllV SW{;R. BUS 'D2'

IQ SWJON ANNUN.

1600All 760A

2000:5

141

~~p·~~ 200 ........ ,__---t-.....+-« 151

!1'0041 3(405 300:5

1600/1440 121 ~

Bf 409 NO

l -500KCMI L ICU> ISEE NOTE 31

FRM BELOW""'\ 600/600 "BlSWS FOR • :+..-I""\-+

M.C.C. "E4J' 161 BE406

6-500KCMll ICU>

Ill M.C.C . ' E< IA" FRM BEL OW""'\ 600/600 • :~-+ 171

BE407

480V UNIT SUB "EF4 "

161

._-~~~--<~-+~t-T"T-~~..-12_1~~~~~~~~~~~~~-f'~

EME RCENCY INS!. AIR COMPRES$0R AUX. Oil PUP

BDF7

--<

Ill

FUTURE 141

BF704

800:5 600A

SPARE~~ I Bf70G

50

M. c.c. "FTI '

J-• 350 MCM ICU > FR~ABOVE~ 600A/600A • (~-+

BF707

480V UNIT SUB "F7 "

171

181

181

600/400 CRN WASH 200 1 ~-+I PU~P 1-2

MP0041 Bf 405 300:5 NO

19>

FUTURE 600A

6-l 50KCMIL ICU>

I IOI M.C. C. "F 41A" FRM BELOW~ 600/600 • C+-"~

BF< Ol

141

151

161

171

11>

! J I

2000: 5

LOCATEO AT C361 I

BBF4

TO STATION CO MPUTER

2000 :5

..1J_ 1! 480-1 20V • c ':'

27 2 , - - ---- - ---J

I NON NON 1

I Mill!. ) <lliffi' l I 600 I 600!

I -., ST "\ Sl 1

: 1 noo1 17 600 : : I I b : : I I : : I I : NOT E 3

i L . _'.::::;-) : I I I 1 FIRE PUJ.P

,.,J;;;:- -----_ _J ""' I ~]BOA 1

CONTROL PNL

300

ELECTRIC FIRE PUMP MP0051

NOTES I. FOR MA~SH VAULT IRAHSFORMER TAP SETT INGS

SEE OWG. E-1 SH. J. 2. FOR AOD IT IONAL NDTES , LEGENO ANO REFERENCE

DRAWINGS SH DWG. E-4 SHEE T I. 3. BREAKE~ FRAME SIZE IS 600 AMP AMJ SHUNT TRIP

UNIT IS SET TO PICKuP Al 1180 AMPS.

~~.;r. ·; .• ' "'"" .• :~+n;;~;::;-··----.. -·-··-·-.. ---- -··-··-.. -r·--.. -··-··- .. _,,_,,_ .. _______ ,,_ .. _,,_,, _______ , ~- __ 2 l l. 2KV-480V

400 AM P

.. ---------f~ -~~~-- -- ---~::~! I ) 150/ IOC ) 225/ 2DD t 25110 22. 5170 )1 50/30 ~251 100 I

I :4~-----2~8:2 __ ~=- =A~-1Bf:5---~r:_: J I ~;:~~~~ 4/ C •8 l/O 12 A<J 8 1/3/C •8 AVIG l/O '2

~:~Plmr. PNL. IOOA IOOA, 39 ·~ 1304 1 SPARE ·an· DISC.SW DS1762 c ,, 15KVA XFMR l -l/C , 4 DSXJ040 SOA 1 460·208Y/120 XJ009 l•-60HZ 9KVA XFMR 4/C •8 4 •8 AWG

~ IOOA, 39 5 460V -208Y/1 20V 41C 16 052763 3•-60HZ 2/C 1 4

50A 4tc ' 8

1 0A DISC . ~ GOA DISC . 600V , JOA 600V , 45A

3 DSX3040A DSMPT I

4 UC PANEL

l / C •2 ll009 6 i~~~t&I ~2 J/C 021 ~ 3~~ J •6 4/C •8 J/C •2

;;, FUT URE ___ @"-_:_ 1:_0~1~ 1~NS

MARSH PUMP • l MP1 T6-J

120/240 ITEM::ARY I MA:SH li;~:1 OU8- 16 PUMP •2 Ll040 MP276·2 I. 5KVA XFMR

i 460-1 20/240 l• -60H1 2/C •1 2

. AIR

SAMPLER •2

Cl066

I

). :i;~:J ), ~1. SKVAXF>lll

i 4B0-1 20/240 T l• -60H1 I

2/C • 12 : I

4 ( ;s'\ ,_ , AIR

SAMPLER • J

CJ067

FUlURE MA RSH

PUMP • 4

L-·-··-··----··--·----·"\_"'-'"--·-··-··-·---·-··-··-.. -··-··-----·-··-··----··-··-·--··-··----··--·-·--.. -\_ PURCHASED ANO INSTALLED BY F IHD

DAVIS-BESSE NUCLEAR POWER STAT ION WATER TREATMENT & TURB INE BLDG.

480V UNIT SUB-STAT ION ONE LINE DIAGRAM

E -4 SH . 3 FIGURE 8.3-16 REVISION 31

OCTOBER 2015 DB OHB-16 DFN 'I :/[LEC/E4Sfl4 .DGN

TYPICAL FOR4

r-iieerils-1 :-::r I I ~ BF2J45 I 1-11c No.a-1Wc

MANUAL XFER SWITCH 60Al.f>

PENT. 'PBP50'

1-3/C No.l

JO KVA 45 KVA XFMR ~ XFMR

~ .\7. l:o~~HI, ~ ~=o~~HZ, 1 20120av.~ 12012oav. X57DI X4901

.c J J ~· :.... ,., c ~ ~ ~

:: ~ 24 42

CKIS CKTS

LTG. PNL. L TG. PNL. L5701 L49DI

OISTRIBUTION PNL. DP6702

RM. 603

r-iiC(EiJs-1 :-::r I I ~ BE2JJ9 I ---'

1-3/C No.a-1111 ·c

NOTES (CONT' Dl 11. THE PORTA3LE CABLE IS CONl>ECTED TO RECEPTAQES ATOP THE NCC' S

ONLY DURING MODES 5 AND 6. DURING POWER OPERATION, THI S CABLE IS REMOVED AND STOWED. THE NONESSENTIAL CONTAINMENT LIGHTI NG SOURCE SHALL 8E USEO ONLY WHEN THE NORMAL ESSEN! I AL SDURCE IS DEENERGIZED FOR MAINIENANCE.

12. KIRK KEY !NllRLOCKSI 6-----6 I A KEY CAN ONLY BE WITHORAWN WHEN THE CU. BKR. IS OPEN: KEY WILL BE HELD WHEN THE BK R. IS CLOSED.

I ;:-;;; ;;R--;U~2-~ SEE OWG. E-3 I 1 lrn 1

1 1 FOR DETA ILS

I t I I A0211? I I I

l,~ 6;;GR-;U~2~~ SEE owe. E-3 I l 1111 I FOR DETAILS

I t I I AC211 ) I I ! I

NO TES I. ONLY FIRST FIVE DIGITS Of CONDUIT RACEWAY ARE INDI CAIEO HEREIN .

FOR COMPLETE DESIGNATION SEE ELECTRICAL qACEWAY SCHEDULE. 2. UNLESS OTHERWISE NOTED ALL BRKRS ARE 3 POLE. LOAD BREAKERS ON ES AND

F5 THA T SUPPLY SINGLE PHA SE TRANSFORMERS ONLY USE 2 OF THIER 3 POLES. l. XFRMS lllD LTC PNLS Ll701 & L210l FURNISHED AND INSTALLED

ON CONTRACT NO. 8.

4. CABLES HEOING LTG. PNL'S. ARE STRANDED CROSS LI NK£0 POLYETHYLEN£ TYPE, FURNISHED BY CC\4.

13. [jJ SYMBOL INDICATES CONT ACTOR. 14. SUPPLY BREAKERS BOFS AND BCE5 ANO TIE BREAKER Bf517 AR[ KIRK

KEY IN TERLOCKEO SO THAT THE TIE BREAKER CANNOT BE CLOSED IF BOTH SUPPLY BREAKERS ARE CL05[0.

I I 3 No. 210

L--I

L__ __J ~------ _L, ~~~~¥~1~s1a6 I ------------2A CROUP+28 CROUP!t-2C ~OIP:SWYO FD 2 SWYD~FO I ,1 ~ IA GROUP 18 CRIJUP IC CROUP: FUSE FD

5. ALL LTC . OISTRUBITION FD BRKRS ARE 2l5A FRA~ SIZE. EXCEPI ~~ERE NO TED OTHERWISE.

6. A.C. LTC. CONTACTOR SHALL BE AS CD TYFE 920 RC SWITCH ELECTR ICALLY Of'ERAlEO ANO MECHAN ICAL\ Y HELD 600 VAC,

DISTRIBUTION PNL. DPG80 2

RM. GQI ,,,.- f6~ ~~~Al~s6' SH . 4

I-'--- 0tMcc2 - - -1 I I l 150 VOLT l' I I 1' BUS 1' I I ~ 0112 ~ 02 11 I I ~ = I

SEE NOTE 10

FUSE FD I ~DU~E I ~ ' ~rn~~ i :;; ![ i MODUU

-- -- __ J DI STRI BUT ION _ -- ---- __ I No. 1

~~\~~OJ CENTER ~~E 9 3 No. 210 ,.-~~~\~~OJ

5KV-J No. 210 B~~~~A~.w~~ ~ - - -1 tiQ!U!!...Ml2QQ I ~l~l/zrn I UHlli"!!f!ON I 8 l•,60HZ , I

1 •<J ~ ~s~~~i;v I I. c XBYI I lc~8 I I I I DISTRIBUllON PNL BY-I I L_~E~~~~-'

75 AMP , l POLE. 120 VAC CO IL WITH HEMA TYPE 12 ENCLOSURE.

1. T\£ PHOlOELECTRIC CELL AT THE WATER TREATMENT BUILDING IS A FISHER PIERCE MODEL FP779DB-S5. THE PHOTOELECTRIC CELL Al THE TURBINE BUILDING IS A FISHER PIERCE t-\00£L FP\20-EPS.

8. LOAD IN LTG. PANEL 5702 \LOCATED IN CABLE SPREADING ROOMI SHALL NOT EXCE ED A BALANCED LOAD OF 15 KVA.

9. CABLES 01SCONl£CTEO PER ! MM NO. IS i 88-0S59 AND BB -0612.

10. ECP 11-0470- 001 REMOVED SOUTH DISTR IBUTION CENTER . CABLES WERE cur Off FLUSH ANO LEF T IN PLAC[.

I NOTES CONT' 0 ZONE A-4)

~EE OWG. E-7 FOR DETAILS

[ -OCMCcl ___ l I l 250VOL1 ~ 1 I I <t BUS <1' I I ~ Dill ~ 01 111

I ~ = I

r--- - ---------------------- ----------------------~ : ~:~ nfs;~~~~~~~ fs·- - - -- ~A~Ji· ~:L-----------------------------i

I 1600A BUSI

1 LOAD 8J{~· sw:L I 750 KVA XFMR

<le l•,GOH1, I • T 4.16KV-480/27N I c OF5

, 'n BDF5 ~ JGOOA FRAME

I ! ~~~~WIP I

I ~Kn•MR <JB 3•,60HZ' I I • c T ~rlGKv-4ao1mv I I A 8 !. I 1 n BCE5 ) 16DOA FRAllE I t ~~~~WIP COIHl~~~MELOW

I TG OISTRISl!TION SWllCHBOARO ·r s· EL[V. 4 1603' -0' I AREA 6

4BOV LTG O!STRIBUTION SW! ICHBOARO 'f5'

I .----~~----~~~--~~--~--~----~--_....--~~--~--~--.--~--~~~--~--""""' li--...,_ ... _ 11_60_0A_s.us_1 __ ...,. __ ...,. __ ...,._._...,. __ ...,. __ 4_Bo•v-L_rc_o_1s_rn•1-Bu_1 1_0N_s_w•1T_cH_~_AR-o_·_Es_·_ ... ___ ... ___ ..,._....,

I I I I

~ BF501 ...._ BF505 ~ BF507 ~ )BFSOS e 80A

TYPICAL

-;- ~O.."': ~~ ~ ~

PENT. 'PAP2P' 30 KVA ~ ~~ :~~ ~ ~

XFMR .:.,~ 15 KVA iB~ . ' ~:o~~HZ, XHR ~ ~ ~ 208f 120 :,, :;o~OHZ • :0: ':'. ::- X<SOJ = I 10/240V ,..., ~ 45 l(VA ~~ ~ X49EI

J ii~~:~~. L ---1--1---A-UT-O.--, ..... ~_- : 0901 XFER

, S•ITCH -

4 :~~cl ~ 1 s D49EI ~ £

CABLES FlllNISHEO

BY CON TRACT OR ITYP!CALI

NOTE4

45KVA XFMR J0,60H1, 480V-2081\20V X5701

45 KVA XFMR l•,GOHZ, 4BOV-2081 120V X\70 1

LTG. PNL. L390 1

42 CKTS

42 CKTS

JOKVA XFMR l•,60H1, 4BOV-2081120V Xl701

BF511 ~

45 KVA XFMR J•,60HZ, 480V-2081 120Y X4 701

BFS\3 ~

30KVA XFMR l•,60HZ, 4BOV-20B/l20Y X4301

BF502 ~ ) BF504 e

JD KVA XF MR l•.GOHZ, 480V-208/ 120V XJlOI

!5 KVA XHll l•,60Hl, 480V-208/120V X2301

BF506 ~ )sF508 ~ BF510

45KVA XFMR l•,60HZ, 480V-2D8/120V X500 1

15 KVA XFMR l•,50Hl, 480/ 120/240V X41EI

I I

'---<t)BF5\ l l

~ BF512 g NO I ~! ~~TE I

46350, 46351

30 KVA XFMR l•,60HZ, 400V-1001120V X6701

6-l50KCM-2-l'C

~ )aESOI ~ )BESOJ ~

ON/OFF

NOTE 13

BE505 ~ )BE507 ~ )B£S09 e 8E51 I e )sE51J ~ )sE502 e

JO KVA XFMR Jo, 60HZ , 480V-20Bll20V X4401

JO KVA XFMR l•,60HZ, 480V-208/120V X3401

15 KVA 45 KVA XFMR XH-111 3'0,GOHI, l•.60HZ, 480V- 480V-2081110V ZOB/120Y X220 1 X1701

45 KVA XFMR J•,60H1, 480V-10B/110V X3501

JO KVA XFMR J•,60HZ. 480V-2081120V X4501

BE504 e BE515

~; TYPICAL

~~~

45 XVA XFMR 3'l,60HZ. 4BOV-208/120V X4101

- A"JB /.c -c~·

45 KVA XFNR l•,60HZ, 480V-2001120V XJOO I

CABLES FURNISHEO

';- CONT~rCTDR ~ < 1\ii~C~I

~ BE500 ~ )erno ~ )BE512

X5TEI

JOKVA XFMR J•,60Hl, 4BOV-2081120V X3011

I -o-~1 ---1-----~--' : I 057EI

- LAuro. ~ XFER u S! SWITCH 0.. :i: IOOA JP~ ~ ACIDC ~

'----v--' .----l41JT19\1 JT191011M--~ PENT.

'PBP50' lO

CKT S 21

CKTS 42

CKT S 24

CKTS 14

ms 42

CKTS

§J __ l Ki801 ~ 24 50 42

CKTS 41

CKTS 42

CKTS 42

CKTS 24

CKT S 28

CKI S CTRL ROOM ,- - 1 AUX. BUILDING ~1 ~

l~ l i A\78 JO K~!.~~~ 1

- -.J ~r- -:0 I I~ I I~ I~ I Vl ·~ -.J aJI

C 480V-208/120Y. A \TlP. FOR 41 ~e 4 No.2-2·c ~-----9'

LTC. PNL l79D2

LTG. PNL L7901

:~--~ I I I I 1C3 I L."1- _,

L TG. PNL L 7903

CTMT VESSEL

r-MC"cm-----------1 I I : ~ )sE420s I --r N'1cNo--:12A.G - - - - - - J

1 'C 1 \7 8 9 KVA XfMR C l•,60HZ,

A ~480V-200/120V .

c~8 ~'.~~; No.e-1111·c

21 CKTS

L2001 ~

I I~ :~--~;; :~ :~ 1..."'_ -· ClJ

26 CKTS

UC. PNL. L4801 ~ AUX. BLDG . 14

CKTS

L TG. PNL. L49EI AUX. BUILDING

LTC. PffL . LTG. PNL. LTG. PNL. LIG. PNL. LTG. PNL . L2301 L5001 L5JOI L41EI

'----v--' 4801277V '----v--' OFFICE BUILDING TURBINE

OFF ICE BUILD INC

TURBINE 8UILOING

LTG. PNL. L67DI

'----v--' AUX. BUILDING

JOA LTG. CONTACTOR PHOTO ILCJ0\4 1 WISUECTOR ELECTRIC

CKIS CKTS

L IC . PNL L TG. PNL. LlC. PNL. LlC. PNL. LIG. PNL. LTG. PNL. LTG . PNL. L5401 Ll7El L57E I 13011

~~ ~~ IURB. FUEL

HANDLING AREA

4 No.6-l"C AUX. BUILDING CIRC. WATER

BUILDING --' T '--- CONTROL ROOM PUMP HOUSE

AUX. BUILDING '--v--'

TURB. BUILDING LJOOI Ll002 L4001 U002

'------v-------LTG. PNLS.- OFFICE BUILDING

:480V LTG 01SlRIBU710N SW BOARD ' ES"

1:r1 L1tg )_:e~:L.2

CDBFB FROM OP3027 I I

L _ ~ ~.E:4ie sE:6: )BE:6l 4\71 J .60~1'.F~

C ~4BOV-108/110Y . A X3052 c~B 4-llC No.210-l"C

21 CKTS

• :::g u ~..... 3".60HZ, i~ ~~ 1~~ JOKVAXFWR

5' ~;;,. g; ;;,.(•Bov- 1oa112ov. 75 KVA KFMR -< ,..... .!.. ~ .!.. X3GOI

l•,61111, 480V-208/120V.

Xl702

CABLE SPREADING ROOM SEE E-l94

REFERENCE DRAWi NGS E-1 AC ELECTRICAL SYSTEM ONE LINE DIAGRAM E-3 4.16KV MElER ING & RELAYING OOE LINE DIAGRAM

E-6 480V El-IERG. MCC SIS'EM ONE LINE DIAGRAM E-l 2S01125V OC & INSTRUMENTATION AC ONE LINE DI AGRAM E-395 TO E-400 <INCL. l L IGHT \NG & CO~"'-JNICATION LAYOUT

DRAWINGS AUX. BLDG. & CONTAINMENT VESSEL E-390 TO E-39J I INCL. l L;GHTTNG & CO~"'-INICATION LAYOUT

DRAWINCS TURBll>E BLDG. E-408 SH. I YARD LIGHTING

E-360A LIGHTI NG L COIMUNICATl(}I NOTES, STANDARDS & OETAILS E-362A LP SCHEO. AUX . BLOG .

E-383A LP SCHEO. CONTAINMENT BlOG. E-384A LP SCHED. TURBINE, OFFICE & MISC.

AC ID PUMP HOUSE OWG. E-406

SWCH ON/Off I AUTO CELL SEE

~

LIGHT ING PNL Ll04 2

'--y---/ SBO BU ILDING J' c

J No.25DMCM I -IC No. 210

HIC No.5 11/1 •

DAVIS-BESSE NUCLEAR POWER STATION r - MCcFTi"a- - - - - - - - - - -1 I l I I I I 5\ )BF2160 ~ )BF1151 I

I_ -r iJi99A-iii1·-- - -r mm-~111· J-1/C No.6 AWG 1-JIC No.6

8 JO KVA XFMR 30 KVA XF\41 •<J J•,60H1, l•,GDHZ, C ~480V-2081120V. ~480V-208/1 20V. X2702 X1ll1

~~B 4-\IC No.2-2'C 4-l lC No.2-1111·c

C ~2 JO a~ m~

HTR. PNL. Y2712 L2701 ~ AUX. BLDG .

EL. 565' -0 ', AREA 7

OISTRIBU!lON PNL BY-S SE[ DWG. E-428 SH. l

[~;J J60l4E-I' 3- 1/C No. 12 AWG-l'C 9 KVA XFMR

; e J•,GOOZ, "J ~<80V-2081 1 20V. c Xl021

•'1.-8

4-1/C No.a IN 1111·c

c~ 21 ms

LTC. PNL.

~ DIE SE L OIL PU~PHOUSE

WATER 7REArnEN1

IT~IFllA-: !____ ~ _:3~4J 42016A-3' l-l/C-l50MCM

8Y6 cJ~s TRIPLEX

2·1/C No.6-l ' C 25 KVA X>MR I0,60HI , 480V-240/120V. X323J

8 s

DPJ233

1- \ IC No. 1/0 11c No. 2- 1·c

REG. XFMRSKVA 1•.60H2.

10B/240-110V.iE X4709 3- 1/C No.6

l'C 4 CKTS

LTG. PNL. L4706

'----v--' AUX. SLOG. SEEE-405

42 CKTS

LTG. PNL. H3601 H4601 L4705 LGOO I RM 325 RM 429

'--y---/ '-v---' '--v----" AUX BUILDING OFFICE HEATER PNL'S

SEE E-405 BUILDI NG

480V UNIT SUB-STATION LIGHTING DISTRIBUTION ONE LI NE DI AGRA IM

E -4 SH. 4 FIGURE 8.3-17

REVISION 31 DC TOBER 2016

Oil 03- 15- 16 orn ~r :/£LEC/E4SH 4. DGN

tRt{ 13.8(v srGR.BUs.A.

IO SIAiIONCOIfUIER

FRti lt.8(v srcR.Eus 'g',

fl* I

fUIURE6004

fUIURE6004

iT ct6t I

trAc

Et'ZZ

480-120

-( t 4t (gr

-( t{t 480- I ?0

I

^4.B

r{fr'c

il)9E604 BFSO{

{l)XFIIR.AE6.1000/l15Oltv[; 0A/FAi 55oCI 120/12881(YA; 0[/FA; 55oCl.6.Il 0ll 10001(V[ EASE G-tsot(cHtr (cut I

aA

c

xFuR',8f6'1000/l'|SSYA; Ot/F t.i 55oCI 120/1288[V*i 0*t'tl; Elst]z=6.14,4 oil t000r(vt B[5EI PHA5I, 6012ll.8l(v 0El-IA I0 ,q80v0LI5 IYE

3 PHA5I. 60Htr1.8Xv 0ELTA I0 480VU-IS rYE

FRg EELOT

tl.c.c.'E5t' {5t U,[,C,'F5t' r5)BF6O5 {00:5

(9)

BAE6 BF6O9il0

ISEE NOTT 9]

2000:5 BBF6

6-55fiCr.fi1 (CUr 6-FRII BELOT

H.c.c.'86?' (61 H.C.C.'F6?' t6tBE6O6 8F605

FUIURE500r

6-isor(cilr tcurFRH 600/480 l-t/c 4/0 r/r? 0R0

-(( ir H. C. C. 'E63' {t, r.{.c.c.'F6l' r ?l G) IURBINE OECI( sOUIH END POTER

II.fr8INE OECI( SOUTH EI{D POUTRBE6O] sE60? BF6O? 8F601

TTIIP3-t/c 4/0 r/r2 6R0

LOAOSfl0

48OV UNII SUB 'EF6'

FRli 4. t6tv SIGR8rr5',C2"

!q=

4, l6r(v JPH, 600 ar'f 8u5 ill t2t (1)

05c?05- | 05c?05- j5004 5004

,r'oooti'

+I

I

I

I

!

ror

d NOIESI. FOR IDDITIOIIAT TIOIES,LECEIIO AIIO REFERENCE

ORATINGs sEE OTC. t.4 SHEET I.2. FIELo 5H0UL0 nEPrrCE Eilsilnc r00 rlP rircoRir 80tsfi IYPE

t00 Nxr FIJsEs ylTH our|HY Fu5E5 m PUI 50t 10 t lr(s rI IHtPRIT,IiRY OF TRNN5FORIIR X]050.

sEt tt0IE 2I

^Actrflrc

I

^AcI'"f,r'

5PA8E

xFm 'xJ0514 t60/180Y50q(va

IROTI OUIACESUPPORI 5ERY|CE 8100. 6

tlolE 4

5. DSC3OsO PIGTAII.S SHATL IIOT BE COII}IECIEO iO IHE SECOilOTRYOF XFIf X3O5O. III OEDER TO E5TAilI5I,1 ALI. PE TROI IHEOUIAGE SUPPORT SIfrSTiTION, THE PPF PI)ITR FEEOENS (xfm5E[0N0ARY CABLIilG) SHALL BE 0tSC0t6fC1E0 FH0t{ X3050 tiloRECONNECTED TO TllE PIGTAILs OF OSC]050.

SUBSIrI lOli(5EE E-20t8r l/C 150ircil D5J00l 4004 J/L f500t{clt

580 BLOC. 4. SERVICE BUITOIIIG 6 PROVIDES POrtN IO EOIH IHT TTLO IRAIIIItI6CEi{IER ANO IHE B]SIJLFIIE sHEO, BOIH OF THICH ARE TOCIIEOOUISIOE IHE PROIECIEO ANEA. IHE g]sULTIlT SHTO CO+IIIIt{s IHE5t00 0ECHL0RI[aT]oil sril0 (DB-5100i,

PERSOTIIIEL PFOCESSIIiCFAC IL ITY

{. I6KV DISCONNECT DSCzOs

DAVIS.BESSE NUCLEAR PO|{TR STAIION

PZR & ANNULUS HEAITRS

4BOV UNII SUB-SIATION

Ot\lT LINE DIAGRA},I

E.4 SH. 5

FIGURT 8.3-I8

RE\/ISION 3?

SEPTEI-,IBER 201BDB I2-()I-17 OFN=I :/ELEC/E4SH5.DGI,i

FROM 4.16KV SWGR. BKR. AA----.. \:_Q,WG.NO. E-22 SH. I !DWG. NO. E-22 SH.21

CEl-1 (DFl•I)

IO& I I

7

8

480·1'2.CW I

., 8

FROM 4.16KV SWGR. BKR. AB---~G.NO. E-22 SH. I IDWG. NO. E-22 SH.21)/'\

C:EI-( ' ~ ( DFI -'Z.) ..>

HS A~

~~~

l(O

' *

SPA(.£ Mli:,..TE&S (o"'ir. f'ER,

f,CC.TIOM)

,

SIW

~)

+

1'1Z.,._M&FO&~S:l2 to.lli\ITGI"''- O'ISIC:llR. lt.S.~ 211:1..""'( GiR. T'(9£. I"'C. SI ..

&\IS UN DEIL "O I.. T"'G!llt Ra.I- ""I' GE. iVPE. H6A 14 (NOT USE~

8\J& UHDE.lt..'JO\.T#l>.~l Rt\."Y GiE. TVPE 1AVS4E

SHORT CIRCUIT TYPE TERMINAL. S\.OCI<.

*HIGH RliSISTANCE QROUNDING EQUIPMENT-GE TYPE.-0S~l81l..AY 10811>.XAMC (REF. OWG5. E-7Q-"'2·1 ·001 TMP.U E·7Q·Co"·l-OOI AND E-1Q-'-8·1-00I)

$C.llEMC e.w 8 1'2.'2. L. - - ..I 11\M, T1l"'W&F£1t &Ill!.

(/;.E TVPE &Bl a II I I&& '- - • ..I"-""'· TIZ ... W§PEll S~

Mo Pn'O< &ltl (I)

MOll>ll:I. i..lo I~ &BICA.I 5) HlC 17

HlC 1a

H'I 1a

I I (61£ T'(Plt $8'1 L-1 MOOS&. No UlSalc:Ji.IS)

' -- ,,

~ .... ---1----+--------------------------------------------------.... ---1----a--a----... --i--------------------------------------------------4~--+-­~--------... ----------------~:":""":"":'~~--------------------------------4t--Ml\IW CO ... 'T1l9L, 80,..ltt:>----..,. ava E.I (Fl)

(WP &JoHN liU•dtMU) "I.. ' '

SCWEhtE UNIT 6T'-'"·UP CH"MNll. Er w1aa E.ltUIPN\trNT "-Iv"" a 11.u No S/ITi.l.lo\o SVloTEloUlt Pla'SFlll. c ..... ... ac:. lllCI ,..,. ..... IC& ~c.g

ea:1 ICI ooa I EI •t.&Go IC.e C:.5715 a1c.& l!l'ZC.& .e.&:102 BE.106 ... c.tCSll ~c.e12 ICIC 2,C.£. .... "' + 2. El Q'l70 I C>F t BICIF 82.Cl'I" &FIC2 BFI06 ""1>1 DFll "-DI DFll IDF 2.DP

It.I.PUT -

IC E4-1~

E42.I

•I='• (2)

DAVIS-BESSE NUCLEAR POWER STATION ESSENTIAL UNIT SUBSTATIONS El AND Fl INCOMING FEEDER CIRCUIT BREAKERS SHEET I

E-37B SH. I FIGURE 8.3-19

REVISION 29 DECEMBER 2012

DB 04-04-12 DFN F:/SCHEME/E37BSHl.DGN/TIF

(

-

m2."'I --BC. r. 1)$

4 > t.b!!:. ' ,

? [1 1,

£'(Ft)

.!£ '--v---' (i-4 t;J ( £ S • '2.' ') [.E1an (e.s·,2.10)

\ ff NOT TO &E USEO \ \

! I

I

{ . ·. "--- --... ___ ____)

MISCELLANEOUS DETAILS

Be..

c.

(A) Vl7 voa

,BLOC.9' DI .. ~&._. M

· S ... llN\'E 'No (.S&E Tl\&LS)

DAVIS-BESSE NUCLEAR POWER STATION

ESSENTIAL UNIT SUBSTATIONS INCOMING FEEDER CIRCUIT BREAKER, SHEET 2

E37B SH. 2

FIGURE 8.3-20

REVISION 14 JULY 1991

TR.IP

... ... .. !!! .. ~ ~

" 2 ....

:d! • " ...

• 52hb ... •T ••

$ t>S 1>7 OJ ..

I I

~~ .. .. :> :> "' ... ..J Oo ?-" " ~ . 2 z 0 0 uu ., ... 00

>> • .., .... ... "' (SEE. TAl!ILE.)

I c I cu

I A I lc;l.11

CLi.1 <.i "' "'"""" .... WIRt;;

(Ii) Pll ,,...., IY!o Ill. PR.EFll.

n T~lt ... , .. 005

I .. , I

&\..OC.K DtAGRf..M 005 ~

8

"UlllLl"l<.V CO.NT .... CT~

IT"LK u g"'" . . .,., Bl . .. ...

st>ARe

MM N C.9t:!T!lpL aae,gp t-NF -~OMN ,a,...,.,.gs)

&USC.I

T, AC.IGEll

v!v I

i)ec..e11

cs SEE E-)0 SH nG II

II 3

..NOTES~ I. CONTROL SW. CONTACT$ 1-U;.1 3-3C.,, S·Sc.,17-7c

ARE. IN SCHE.WUE.S 0C.Et1 t aDF 1. L.COHTROL. SWITCH CONTACTS 2·'!C. • +·+c:.~&·6'., 8-8c.

AR& IN SCHE.MES J:CE'IZ. I BOFi2.. 3.C.£.LL sw1TCMES(5'2.hQ,,,S2.hlio) SHOWN IN. TEST AND

Wl'THl>RA_WNi p0SITIONS • 'I. Dl<;CO> .. jEC.; S'.l\"TC.\\ 5HoWi.i o 6 Fol!. ~E:~

' a~Elf ~ &DFU O>ILY ) A.t.tutl'L

I ;:¢¢<

I ) Bc:.e.12

l

e A E12. eu

11 l(.iil2 2.42.0 F OI 1l

DF f ADll>frl '2422. MAIN C4NT.&OAf!D(WFfJOHH IMRMU)

D E'VIC£ TyPlj 74'1/ l..o"ioT Cc:l..aT P.....,.~

~E T"fP& ttc:iiA.11

~- 14V 1 IND LIGHT AND FUSES TO SE INS1'ALl.E'O av CONTRACTOR.

v • SCIE"" -..... w ... I U OllEMA.L. I A.L1'£2Wll.1'E _,, PNL C-'T-.PNL e«T acEH (I) DIP INCl'T7IDIN ~ BCS:l" (2) -81>Fll (.3) D~P - .D2N ~ Bt>F~ f4)

DAYISilW: IUlEIR IUl:R SIAlllll EW:lt:lllL 11111 !UISIAlllllS

llDlllG IEEllR Clllllll llEllER, 51([1 3

E-llB SH. 3 !HUI I.HI

REVISION 29 DECEMBER 2012

DB 05-22-12 DFN F:/SCHEME/E37BSH3.DGN/TIF

I ...,..,.._ ___ A 1 ..... ------

......,...,__....,...,._ __ B _..___. ... --

.....,._....,_..._ c _ ...... -.ii.---~ 1_ 1-1~ 1_ lb.I I

' ' l:t ·- f T' t t t :~ T >-_ :-> _ ) sz )---)--J~;~ 1 l ~ J J J !~ "Q" 1Z

-+---1-----1+- I -NOT I{/) II Q II 1 j

SEE :d> NOTE:~

I __ --- 4 lrJ. I 1sc:1-' I z I A B c I I

I 10 I j I U _L_-.=-....:-.=---=---=---- - .J

FOR SCHEME U BE114 & BF106 o ONLY (NOTES 3 ~ 5) >

11) ('J

480V ""C.C:.. e.Y S ~f/J a GO Hi!

SCHEME UNIT START-UP NUMBER S/STN NO. SYS NO. CHANNEL

BEI09 006 T BEI06 006 I BE107 El 00(; I BF 113

~ BE 114 005 I BE 115 BE 118 006 I BF 118 4 --006 2 BFI06 005 2 BFI07 F 1 006 2 BF 113 006 B BF 114 U05 2 BF 115 006 2 BFI09

1 .. C:.L..OSE -1- TR\P

SCHEMe:

WIRE EQUIPMENT NUMBERS ANNUC INPUT PREFIX c BA HC

- - BE109 RI=" 12B '4~

- - BE106 BEl2A 7 4 ') - - BE107 BE 11 l4i

SPARE - - Rr 114 ZSR3602 Z420 FUTURE

- - Hf 118 BE16A 74?0 BFl 18- .. BF 16A- -Z422 - - BF106 ZSR3603 Z422 BFl07 BF 129- -z422

- - BF 113 BF1310 74?? - - BF 114 BFl2A Z4?2 - - BF 115 BF 11 Z422

SPARE

l~WlJK.

WIRE IDDE'S: 1 'V

~

3 4

- J

8 9- w

f 11-12 I~

14

SA -~09 DS

SC

I /J>..\JXILl~R'( CONT~CTS r. •

'" 2.16 cs .., !sz.a.. 1cJ' B1' C(ti2tC)

;,q +o PA

S.PA.R.E

51

z~o

3 52.h'\,.

3Tfi &~ '2.'3f 9 JO M PART OF

[Z4120] SEE E·378,SH.8A [Z42.'2.] SE£ E-3713; SH· 7A

-S<:.~!.ME '5f' llS ' &E I 0 7 f3LOC.~ t>\"'-G.12.,.._ ~ S

• I

'220 Cl

i I 52.CL

"'l BA c.~i211 +S' ""~

<;!>All.£

41

NOTES: 1. CELL SWITCHS (52ho,52hb) ARE

SHOWN IN TEST AND WITHDRAWN POSITIONS. FOR SCHEME BEi 18 SPARE CONTACT 4-4T IS ABANDONED BECAUSE OF DISCONTINUITY IN WIRE #236.

3. FOR SCHEME BEi 14 AND BF106 CABLES FROM UNIT SUBSTATION BREAKERS BEi 14 AND BFI06 ARE CONNECTED TO FLEX RECEPTACLE ENCLOSURES.

4. WHERE "Q"/NOT "Q" BOUNDARIES ARE DEPICTED FOR 480VAC SWGR. ELECTRICAL COMPONENTS HOUSED ENTIRELY WITHIN THE SWGR CUBICLE SHALL BE CONSIDERED TO BE WITHIN THE "Q" BOUNDARY.

5. FLEX ASSOCIATED BREAKERS ARE OPEN DURING NORMAL OPERATION AND MAY IMPACT OPERABILITY IF CLOSED WHEN ASSOCIATED BUS EQUIPMENT IS IN SERVICE.

ec sc. l B) (B)

(A) TR i P12 tA\ l\'B1C _.,,..._...._

BA 8A SC.)tE\'AE SC\.lEME Sri I! BEU~q BLOC~ D\~Gt1:l.~MC.:.

SPLICE IN RM, 3'2S PlJLL/3DX

SA SCH~ME 8EllB~6A18 4-BFI07

DAVIS-BESSE NUCLEAR POWER STATION ESSENETIAL UNIT SUBSTATIONS MCC FEEDER CIRCUIT BREAKERS

E -378 SH. 4 FIGURE 8. 3-22

REVISION 31 OCTOBER 2016

DB 09-06-16 DFN F:/SCHEME/E37BSH4.DGN/CIT

2t ?t frMCC EllA r anErs,EL. 565') I4CC E I lB ( AREA B, Er. 585') MCC tllC { AREAo, Er. 505'r

n0I 50/{0

P tPlr{ P IPzH PlP?H NO P1 PZX

FOR COMECI]ONFRot'( BE22i7 (KC E22ar

I I 50/50 t50/15 r50/r5 50/4t I 50/t 5 oTO

BE22l7

+t5 t5 IR

10 I -€,ilP8!l a

BEI]OO XYE?T

fDR r0 240vrc HccBtlr6?

vLv fivcF0tB

P IPA'

8til08sUt{F tiv2ol 2A

8Ellt4ilvlru59a

ETl IE5OH RI}EVALSUCI LII{E

!aY0H I 20Btlr{lC'IHI YACIIRETITF VLV

r{v507{08Eil5{cc PUt'tP EHvfi{Ir taN I

r50/ I 5

IBEiltlH2 Dtt 5Y5, I -lCIIII lS0. vLY,

I t01 BEgIP t-l

A

BE]I?OFD TO

CF II(

l

I I50 cIHl iloniltso vlv

RCP 2-r s€rlRtI LII€ VLV

1FD iO l{C E]1C ECCS R[ r05

HV t rc 150 vLv IECCS Rr 105 ttc5

Pr.ftlcc E IB

F0 r0 ucc EltD P IP2T P tPa,t PlPzt{ vLY plp?tt I

t HY t iC I5O YLV E NOIE 6 l5 revlv wcFozB

5 t5 re t50/r00'0' U t5 5 tt t5I 50/ I

881CF

6l il15 Bil 8t NC580l

Eil t02H? OILUIION 5T5ilr'f, I

8fl t03HP IIIJ ]-I YLV

88il?t 8ilit6ECCS SUIP l.lPI,f B

8Eil10 PRZF SPRAY L

150 vtvH0iE l0

I( I SITPL LETDOTT [TB5OUI VLV

ncP ?-2 SEALNET IINE VLV

RC PRZfisrf,t v[Y ]

cs Pr+ I CITII AIE CI.FIIJ I50 VtV

t"t l.{vl}6G0 tr1185 II

*t''ot'iMC062l HIHPOzC

DH PIF ISIJCI VLV f8T 8T5I

Bili qJT YI|Y O CIIII HZ PURCEo{JI lso Ytv I

MV50380FIIF?.H

l l5P IPzT

00 A t5 SIAFIER ilorE lDEI.,IINERAL I ZEOITR STOP VTV '0'

I 50/t 5

I I HoH'0'PIP58

I 50/t 5 *€, I 75 P]

t5 IUTUFT I2. UTIII 8E1165CF TI( 1 VENT VLV

225

BEIIT?LEIOOTN CIRS

$ilIIIIPCP l-|l ."d-{L?rii Itr{ .|Lu

Bil111 gv I 159 FoR Cor'rilEciloilFRoil BE?2]B il{CC E22al 508til05

HP l'rJ t-2 vLvBEIIITECCS Surf l-JPI? A

IIPE9JABElI?]crt{r ls0Ptill ?2A

0 Bt r 169 irvt{J0e0 cc 0t 1 t50 vlv l lfr fH,t lso vLv CIRL flli Ir{RVENIL FIil 1 ItII 129 BElte5

IIJ FLT 1 IH VLVcllll FTCIECFAN I

Itr vlv FRII CIIIIP IP2H

vt vTOBE 2218

+

SPARE

PRZR SPRIYI50 VLV

t{vl{I 2a (SEE IIOIE 4DIG. E-5 5H,

r5 It5 6 I 50/10 t5

PI P?Hrl I-€'SPTRE l5 IE 6-500 KCt{lL 8il166rD FRI,I ITC EIIA

BEil5lFt) TO UCC FI IA

BEl t78RCP I.2 SEALREI LIIIE VLV

FD FRII I,ICC E] !A

SPARE ili6 BE 06 8E1il8 8Eil2{ fi cr rl* i5E v,v I t{vl4llrT0 ifr+n

.t8Eil 35 LP I IIJ vt t2 tlO ECCS 5u1.f, t-3

Plf Icnir I50 vtvFEIiT ?{A

CC til'6;C vtv I Hvl567lIO CRO

8E I I 50 tiOIE 9

ts I0 rrcc EllECTIIT EHTR SUI{POUI VLV

FD FRHUIIII SUB EI CIHI

IFM I'0'

MCC E12A i aEEA 6. rr. Eol'lMCC EI4r rRE[ 6, tL. 605')

MCC EF 15 r ,imr 6, n . Eol'lMCC E I 2C { rHir(E srnuc., EL. 576' r

SPLICEO IO[cc E]ztEXTEilst0t{DfG. t-6,5H.5

Ao-oa tor rL IVHH

MCC EFI2C rrlrmr sTRUc., EL. sr6')CTIIT TIR CLR FAN ] fTR SYCHS A

tI

NOIE 9IHIS sHT

NOTE 9

IHIS sHT ts€t NoTt ?rl0a I

HEIII.EARR IER(5Et

I5 150/40 fioIE I NOTE s r{oIE ll t50/lIHIS5HI.

THI55HT.

al00aFD FRH

UI'IT SIJB EI(EIIIRY FROT iEOVEI

Bt12t6 rtsl]r I BE I 2]J BE r 235j-ltc250 |(CHIL d 214 I()A 8EF I ?5

5Y PIf SIRNR08il YLV .0.CTRII EHER

cl{05 rr{ll 1 vLvCIRI.I BOOI{ ErtRvtNT sts FAlr I

HC021 l CIRI' ETIR SISco{oEr{str{c uitr I

IBATTERY CHARCTR08c lP

BAITERI CHARGER

oBc tt{2254 5r

t{J5r Pl+ sIRt* I tD I0 ttc EFt2c 1 wt58l0

8EF r 5l r8lil FD)r1c00l 3

(FRIIUII II

8EF t5l {BTI,I FO

'HC00t J

BEF I 2?(8Ig For I '0'

t5 C I 5 I 50/ t5 l/c ilo. {/0 L@ l0a150 t(cHIt- CHlPS

Ht6r{ 5P0CH 2 PfRHICH sPD

l)

t5a

? f0 fRlrUTII1 SU8 EI

8E r 2i55f PTf SIRI{R 1

I)RII YLY

(SEE NOTE8t r 226CC TTR OISCHIINE I ISO VLV

BEl2l9EI'[R VENI FAI{ 1

llSATTERY RIIIO AIX OPR

RTCI YRF I AFP ] SUCT

r.lcc E I

8EI50rFRt{ r|cc Ft5UII1I BFI5()I) 5X

t2lVEXTL FAll 1

LOT YS-TIGE SMUCIIJffE VLV JOCI(EY FIRT PTP

I 50/ I 50/t0 I IE I5 6A A ABE BE 1222

AFP RIIVEHTL FAtI I

8E t237

EI'IR VEHTL FAIIIII DAI'PER I

1 50/l 50

8E I ??l gE I 22rRtcI tRt]

BE 2n BE I 284FO FROTI BEF I2{

5T PI.f sTRNR, ]cR055 TIEDUCITOFI( OIIIPTR

Irc5056 i LOI VOLTTGERII 429 VENT

ISEE IIOIE ?I 5Y 150 vLv T0CLil6 TTR

r{v I MCC Et2r

I 50/t0 o10 rlcc E tzEiVIA JTI807 SPTRE d

50nt

5048E 1202FD TO HCI EIzC

8t r 2t4 BE I ?4? BE 124 lLOY VOI.TAGI, SIGRRI{ 4?9 VENI

P1 P5BI

NOTE 5I. SEE OTG T-5, 5H, I FOfl CEHERTL IETEs.

?. rlRr xEY tr{rtRLocxs ' d -------

d ,

ol lEr Ctli oHLY BE rllHDRAsl II{EN THE CRKI ERXR m FUSEo 0lSC.SIIICH l5 0PEll; xEY YlLL 8E HELD fitN IHE 8Rl(R !S Ct0StO.

CC TTRLII.IE I 5/25- I I MCC II2F

I Jl *ol+

IO EFIM

r AnEa 6, EL, 585')

CIt,iI AIR CLR I-5Ir{ IS0 vLv

8il,!0 tl.tc00 I I

ur{lI I Fil{CIIII AIFctR FAt{ I bI PROYIO€ IHREI TEYS FOR EACH 5TI ff ITITERI.OCI(S TITH

THE taoloR C0ilTRoL CEr{rt8 Dt5t6r.rAIloil. (EXAIfLE ttlA,FB, EIC.) STAIfED ttt IACH (il,PRZR HTR TI,E! !3J1c_ IFRfl TCC

UI{IT BE

Et5l50t)

(FRt{ l{cc Ft5wtr 8il501)

BE I29I r0r

t/c H0. 4/0 5

cl xEyS CoRRESP0ttolttG I0 IHIERLoC(S Sr AttY CIvEil t'fcsHALI. NOI FIT AHY OIHEF IICC.

P IPSB JT]95JBEF I5t{c001 5CII{T AIRcLR F^r{ J MCC EF I 2D ( aREA 6, EL. 603'),-------------1

]. FOR IICC EFIzC s€PARATE COHPTRI|f,TII5 ARE TEOUIREO FOR THE

INCOIIIIIG FUSED OIsC. SIIICHEs } A I'f,IAL BIRRIER IO EI{sUNE5EPARAIIOII EETIEEI,I THE II{COI,III{C FEEOTRS TRU HCC'5 E12C & F12C,

I I '0"1. {8OV BREN(ER 15 FURNISHEO UIIOEfl IzOVAC I,[[ B/II.5. LAC|( 0F 5yt80L (r 0Rl1 0Eil0IES ilo 5IABIIilC fRoil 5fA5 0R sFflCs,

6. ERENIERS BEIII? ANO BE]15] ART HAIi{IIINED II,I IHI OPEI{ POSITIOT{.

T. TSERE O/HOH.O EOUNDIRIES TRE OEPICIEO FOR EssEI{It[L 48OVACBRETKERS, EI.TCIRICIL NIO COt{IRq. COIIPOI{EI{IS HOUSEO EI{TIRELYXIIHII{ IHE BRTAXTR CUSICLE SI,IATL BT COIISIDEREO TO BE TITI{IHIHE O BOTJIIDIRY. TXAIfIES T{AY INCTUOE OVEFLOAO HEATERs,OVERLOID EEI-AYS. AI'ID CONTACIOfi I'IOUI{TEO AUXILIAflY 5IITCHEs.RfF. CR 01-063?9.

8. IHT, IOTO YIUE FOR SAITERT CHTROERS 15 OEPTITOEIII UPOH THE LOADScfif RI0, A5 DErtRr{ll'lto BY CAtCULAT Ioil C-EE - 0 I 5. 0 J-008,

PRZR I]IR r[lBI

PRZR HTR T[IB2

PRZR HTR HIIBJ

(5€E t{oIE ?)[0 d

I 50a

II

ile9

I

1*,(FR[ ICC Fl?[UIIIT BF I 224)

?08HCC Et2Al

t50r

'0' '0'(FRr rcc Et?auillI BEr20?r

MCC E15

BE I 2O8A 9. TRAIE SIZE OF CIRCUII 8RE[I(ER HA5 8€EI{ II{CffTSO AHO IHEASSOCIITEO HCC HIRDUAffE IilST BE EVALUAIEO FOR ACCEPIiBITIIYPRIOR IO II{CREISI}IG CIRCUIT BREAKER IRIP RATIHG,

BATTERY RII 42S TO AII' DRR

ctR IO. THT EBEAI(ER AssEI.GI.E HAs BEEII EVALUAITO ACCEPTIBLE IITHTHE I15A TRIP UNIT III ECP II-0?24.00].

LIGINDMCC EIzE( AREA 8. tr. 5{5'l

t-l tr{ t50 vlv MCC El lCIExIEilIl0N) MCC E]IE( aREr 8, EL. 601')MCC El lD ( AFEA 7, EL. 56i'r MCC E I 28 r mu 6. Er. 5s5') ( aFEA 5, tt, 60J'r r aRtr 8, tt, 585',)

'0' U '0'5

l{0T'0' 3- l/c-H0 Ffiox nccE I 2r{Y1A JIISO?I

fn0H tr+

LotA

coirTrcT0R

STARTER OR COIIIACTOB IIIICH RTCTIVES A SICHAL FROI IHTSAFETY FEATUREs ACTI'AIIOiI sYsITX {5Ft5} RTF. OI[. E.IIB,STAETER OR COI{TACTOR TfiICH RECEIVTS A SICIIAL FROII IHE SIEAXAND FEEDTATER RUPIUFT CONIROI SYSITII (sFRCsI REF. {}T[. E-]98

INSTALLITION COI{TRACION IO IilsIAI.I. Iti EXISIIT{G sPACE.

IIIE 74/O AUG l lc

l5 t5 I r 50/30 5 t5

BE] I6ICC TTR TO

LINE A VLV

8EI95t0 FRoil tacc El1A

85 8E I ?58 gt r 291 BE t29{sGI DRN YLV

t0BEillicTtal vacr{RETIEF YI-Y

I 50/t 5

BEltSlF0 FfioH HCC EllC

45

cil{r. t50. 0BA Ptf l I FUEI OIt

EOOSIER PIIP'0'

tf t 59l EITR OGllltfRsl0r{ HIR

c3621 cIilI I50 vtPENI 7]'0' '0' lr0T U

fD FRH SEr09UI{IT sUB EI(ENTRY FROl,l AEOVEIJ-J50 r(CuL

l0 ttr ti0T '0' I,-.@rtoil4

'-p"

5 1 II'I5TALLATION COiITRACIOR IO RTTIOYT TAICHIilO ITPT sIARITRANt) REPLACE |ITH FVIIR sTIRITR.7

BE I te6 BE I 199 BEltSS!0

t0 fRltUTIII SU8 EI

r18w50?t0

BE] INSTALLATIOI{ COTITRACTOR IO II{5IATI., AOD YTRIICTT STRUCTURESI0 HCC El?C, l4cc EFI2C, HCC EilE & ilzt I r0CAIt EXISTIHGSTARTERS AS SHOTI,I.

0H I'roRil SucItlNE I I50 VLv

tiv t5 I l0 cc cEo B005TER rll'!PrP I sUCT. vLv.

BA At)D T[1.HIRI U

ilolt i 8E 1268 trPI 50? I0 tFPl150 vtv

tccs Rl{ 105cLR Fiti 4

HTI(EUP PUHP I-IOISCHARGE YIIVE

cl[l YA${FEL IEF VLV

LPl.HPI CRO55coiiH I50L vLv IRC l,iu Pl,lP I

II{ OIL PIiP

HoT'0' D]TsEL OIL PIP HOJSEswP 1-1 Pt'P Att ti 1 50/10 I 1tr l I 5

'-p,l l5

=m,U l{0I '0' '0'NOIE 7 {7 BE I I89 BE r 255 t5 t{olt 7 BE 1295

ECCS Rr1 r05CLR FAI.I 5

8E r 296HPI PUif I.I

lt39I}H REI{OVALCLR I OUI IOYER

r{r PU}fs DlScH cR0s5co|tl LIHE I50 Vt V

8A ADO T(IHIR 2

rtTTt 2EtiER 0c Rn IVEIITL FAN I

r.tc025 t cTxT vActaRELIEF VLV

CIRX EI.{ER 5Y5sIAID BY C0tt0

192 BE I e?0 xl0?1 AC LUBE OIT PUif UN IT

DAVIS-BESSE NUCLEAR POl.lER STATION

4BOV AC i,|CC (ESSENTIAL)

ONE LINE DIAGRAM

E-6 SH. I

F IGURE 8.3.23

REVISION 32

SEPTE}4BER 20IB

RC I,IU PI,iP INOIE 9 116 )(FI'R

DO PI'IP HsE

901 t50/ I 5 r0 f{c EF t5uri tr 8EF I 52

5

I0 vcc ElzFTO KC EF15'0'

t50/15BEilll sEE NOTE { BE I 286 BE I t60

IC II,II H2 CIRI,i EI{R EHER

VEIiIL00 Rr,t

Fit{ 2

T UIIII BEFI Att

VENI SYs VACH PHP I.I YEI 5/?5- I r121

'0't5

'0'FDfi r0 t2ovrc Hcc t5 150/15

NOIE I 8E r26rEICF OOIsorx PIF

8t r 10rBEil{6

'0' '0'

8t r ?85

BIIIIRY RI,I

v[Nt rrN t-l

'0' U

t5

8El

?t

tt ?T

t{0. AYG r-llc ilo. 2

BEI?I]PRZR HTR Ti,€I

KI

r(x

8EF I 54CH ? PIRLOY 5M

8EF I 52

CH I PIRLOT sPO

FC f,U, PUIPSUCII0I{ VLV

HV6{050

8Et t90BAIIEftY CHARCTSD8C tPtt FAH I 5T IT VTV

FUIURE I2'UI,III

8El25l00 xtES Pt,P I

rP008l

Er'tR. 051. GEr{. r- r

AC TUREO OIL PUIP

r'f t{ 7l

luc0?8t

HP NJEclrox Pu" r HvHPlz

I{IN RECIR[ tII{T I50 YTV

HOIE: I.ITCHII{G OI{ LOY5PEE0 oilt1.

8Eil{0CIII vAcraREL IEF VLV

gE L t49

L5

l- SPARE

r[FPl 0lsCHI0 ssz

l

0B l0-10-11 0Ft{.l :/tLEC/tESHI.DGN

MCC FllA r aREA?, EL. 6oJ'r MCC Fl 18 i aREr B, n. 6oi'lMCC F14r AREA 6, Et. 603'I

MCC FI5( AREA 5. EL. 60]')

'0' u tFORFROM

IONil,rcc FSzr

NOIE 7 t5 5 , rl 15 rF0 tR[UNIT 5U8 FI

t n9MV05248

IO8t 8F1120 BFII16 IsIDI

CTRII & AUXBUILOING LTC XFIff

r 50/15

F0 r0 ucc Ft lciro1E t

BF I t3l r5Jl2lCIRM EHER sYScot'{DEilsulc t ilI 2

BF I t09H2 OILUIIOH 5TSBLIR 2

I 180 Bfr 08 BF r 162FD FFH IICC FItN

BF $828

r60cIr,rI Is0 cF Tr( 2 ISo vlv tlvcFola

NOTCTHI VACilntrI.IEF VLV

cilli lso vLv CTIII NORT SUI4P

I50 vt vCIIIT ISO VtV

PEt{I IA FOR CONNECI IONFR0i{ BFG205 il,rcc F62r

il0TE P2Py N0iE t0 '0' PENI T2

RP5 5Fl5 l(CMIT I 50/t 75 l 5 l5CIHI PR€55SYIICH I50VLV HIR

tIO8t5205

+

SPARE8Fr 8F BF 22 It3 Bfu 25 8Filt0 BF I t8t

c1l,tT vacllREL IEF VLV

8flilt564 offi [!v

8til86 8Fll47 8Fil76 FD FRI4UNIT SU8 F]

t0 rRxtirill sl8 11CIIII cF Tr( 2 st{Pl CII,II RECRlC

tAl,r 2PFZR SPRAY LII{Tt50 vtv

HV2',n60 H2 0lL $r$. r-2cilrl t50. vLY,

HV060!0 cIRt Rt{ fltR Hv525?r

YETiIL Frfi 2 lil vl'/c5 Pltr 2 oul vlv r1vt53l0 cc IN I5o yLV 2 [v15678

IO CROt IF m t {sf,t NoTE {irflts DYc. )

5 ti l5 rwd*. 150/r9 tl 50 lI'IOIE I xYF ?a 'ftE8F r r{,{ BFII?8 8F I BF I t25

ct It( 2 vEilI vlvBFtr49 01 19 8Fil82 BFl r!5

F0 r0 Hcc EltBET r58

BF r52BF I rgS

cilrr t50 vlvPENI I]T

RC PRZRStfL vLv 2

HV0240BCII,ITD tsc

C IRTI Ei,TR cc cRo 8005rERPTIP ? SUCI VLV

ItoTE IIHl5 sflT.401/225

FDR T0 ?{ovAC r,tCC CC TIRLlliE 2

CIHI VACHREt IEF VLV

cc oul 150 ulr rF8I CIXI

$l 1'r[5ir vrr

TTFI; TXftrlotre

P?P5F no r 5olro

P?P5F 515IEII FAH 2

I 50/ t5iarE 5

I 50/t 5 l I 5 r0 ilcc til5UtiIT BEF]54

IIOIE II 181 r0l 48 IO

UNi2 8F t8 th

VAPORL INE VLV

BT l0 BF I 18,1 8Fl l 06P?P5F

aI

IICIRil ETfRCNOS UNIT 2 VLV

soe ffr tso PFZRSHPL

Oil RTH}VAIsUCr LtilE YLV

t{vDH t I 0 cIrI vlclr HvsolgoR[I.ITF VTV

cc ITR CIIII VACiIFTI- ITF VLV

CIFI' EHERC CC lll 150 vti'jI.2 IO CIHI

8r;i r0rfi uv a

P2P5F BFill7F0 r0 r{cc FllB

LIHE 2 ISO VLV SIANDBY CONO UTIII 5/25 - n 5/2S- tro.!a rsor\{r* o I5 I 50/1 5 2254 5

BF

T0 ttcFIIE l1? 8[ BFI]O?

CTRI,I Tl,lER VENI5Y5 VACH PHP I-?

cc Ptf RflVENTL FAN 2

PRZR TOO

SilPL LlriE vtvAFPI 2 II{ilr I50 vtv

r0 I0 rcc Ft l0 8ft40lHc00t ?

8F r 50tCIHI CI.B FAN ?

NOIES: LAICHII{O ON LOT5Ptt0 oilrY.

HOIES! I.IICHIHO OII LOYSPEEO OIILY,

MCC F 1 2A { iREn 6, tr. 60l'r

MCC F I ZB r anra 6, EL. ror'l MCC Fl2C rrNIaKE slnuc., EL.516'lA

FO FRT SET D[G. E-6 SH. INOTE 9THIs SHT400t225

ilorE 9IHIS $II IINIT FI '0'

r5

r{0I '0' o-oA toa z. I\-lrll-tF-l[oIE I NOIE S l5 NOTE 7

KCIIIL tlBF BF ] ?09

TH I55HT. sF t2le

IH ISSHT. TO BF I2I{)A gF t2t8 BF

DG FUEL!TOftAGE

FO TO MCC FI?C BATTERYDBC?P

CHAR6IR BAITERf CHARGI,R0Bca

vEt{ Ir- FUEL OItEOO5TER

EI'[R OG?lllf,Rs|oil HIR

5f Pl.+ slRtrfi 2 t0 I0 flcc Er12c SI TO

EASlr{III DAI,fER ?r50/r5 FD fRX 8,10t PfP

'0't5

? Yt, v

=p"I 5r E (Dr.aFa9

xvl 3670

uflll 5u8 tIt-150 r(oatt(FE()t'l AB0vtl

'0'I

BF t229crRL $rtR 5Y5

gF t0 8F4A

Er I ?5?AfP 2 0t5CHI0 5C?

BF l 2t55T PI.f STRNR 2DRT{ VLV

BF 1 281

5[ IO INTAI(EFORTOAI VLV

AFP RI'vtilll- FAil

VEIIIL FAI{ 2 LOTvot IAoE srCR RH

CTXTT AIR CLR RECT YRF2 BATTERY RI'iTO NTI DPfl

LOT VOLIAGES|GR Rr,r 428 vEr{T

BF t 268sIAilD 8r CorO 2 FAI ?

5t-2 IH IS0 VLV DttSEL ott PuP tflllE

HOUST SUIF 1.] PHP BtE t5P2P5F IE I 50/10

'-p-'0'

1225 A I 50/! 50

I0 taccEFlaJ

SPARE I (BTr,r IO t{cc FIM8f l2ll 8F r 225

cn0s5 iltDUCT$RI( OAi,PER

BF I 205EI.{ER VEiITL FAIi 2

8,1221CTI{I AIR CtR I-]Iil I50 VLV

BF II 8F2P

1 5 rnorE ?r BF I2??v TO 1tv13950

BF I 284FD FflI.I

BF

HPI PUlf, 1_? tf,tgB-lIC IUBE OII. Pt,,tP

RECT YRF { Elffi Dc RH 2VEIIIT FAII T

BF 5Y lso vLCLNO ITF

l.{cc F t?ALEIOOII{ CLR I

CC fTR IN VLV 'Yt t' ETTF OG

AIR CI.?sR 2

te

fn0H t2 t0 o P2P5F tr P?P5Frcllvlt.J0 I B

FDR T0 I20VAC l{CC150/ t5 SPTNE l5

8F r ?40 8F t? rl BF l20S BF 1256Et'fB 0c Rri 2

NOTESI. SEE DXG E.5, 5H. I FOR Cf,I.IERAL IIOTES.

2. {80VAC BREAI(ER I5 FtRt{t5+rE0 Uil0ER t20ViC B/H.

BF BT 8F I 228 I{U PUI,P DISCH CRO55cot{lr. LIIrE IS0 vLv

NOTE ? t26 r

LETDOXT{ CLR I

IN VLVltlDoril ctE 2tr vtv

LEIOOTil CLR 2CC fTR IN VLV

llvI{t00 VEITL FAt{ { '0' '0' BF I 259BATTERY RI{VEI'II FAN I-2

EI{R DC 250at( Pt+

'0'1 50/ t5

8rr?l0rSTITERYTO ATII

nn {28AOPR

r5

8t t2 t{ 1 50/1 5 150/{04 '0' l. LACI( 0F SYIEoL (r oRl) DEH0IE$ ilo SIaRTINC FR0r1 5f[5 oft 5FnC5.1

IFPz DISCHIOSG I

HIR LEIZBF l?60 8r t?60iPRZR I SPEAY VLV

NOIE ? {. BNET(TR IIOOULE 8EII5I OI llCC EIIB AIIO BRENIER llo(}UE BF]]J5OtI I,ICC FIIA SHALL BE REIIOVEI) FROII I'ICC'5 TNO APPNOPRIAIELYsIOffTO, EI,iTRGEIICY IIE OF I{CC EIIB AI{O HCC FIIT SHATL BEACCOI'PIISHTO 15 PROVIDEO IN THE EI'IBCEIICY OPERiIIHC PROCEDURES.

l.{l,Rc020 '0'BF I 25?OO XFER PIf ?

P2P5F

8F 1 ?85PRZR HIR LEI] t269 5. BREA(TflS 8tII4?, EFII{8 AND 8FII9{ ARE IIAIHIAINEO IN THE

oP$r P0stiloH.6. BREIXER 8fI260A IS LOCAIEO IN THE FIEST SIACI(.TOP CUBICTE

0F l,icc FtzB.PRZR SIIPL.LIIIE IOCTIIT YEIIT Ht)R VLV

JIi95{ P?P5FII

'0'I'0' ?. THEFT O/IIOII.O BOTJIIDARIES AFE DEPICTTO FOR IS5EiITIAL {8OVAC

EREAI(ERS, ETTCIRICAL ANO COI.IIFOI COIfONEHIS HOOSIO t.tiIIRELYTITHIN IHE BREAI(TR [U8ICI.E sHAI.L EE COTISIOEREO IO Bt TIIHITITHE O BOUNDARY. EXAHPTES IIII INCLUOE OVENTOO HT,IIERS,OYERLOAI} RELAYS. AI{O COTIIACIOR I,IOUI{IEO TUXILIARY STIICHES.FEF, CF 0i-061?9,

8, IHE LOAD VALUI FOR SATTERY THARCEES 15 OTPEI{OTI{I IJPON IHE I.OADSCENERI0, AS oETEfir,ft{ED 8Y CILCULAT t0r{ C -EE -0r 5. 0]-008.

9, FRAI{E SIZE OF CIRCUIT BREAI(Efl HAS 8IT.il IilINITSED tNO THEASsOCIIIED HCC HAROTIRE I'IJSI BE EYIUTIEO FOP TCCTPITEI[IiYPnloR i0 tNcRErSlN0 clRcUlI 8nEil(ER rRtP Rrilr{6.

IO. THE EREAXIR AS5EIOIE HAs BTIil IVTIUTIEO ACCEPTTSLE TIIH IT5TiRtP ui[i lir EcP t]-0??4-00?.

LECEND

I a 5

ITBIJ

n8t2

fl-8I I

tP l {?{

HIR t8I] 8r I

IaSl H0. 2 r$ -l/c il0. 2 trc

EI,fR, OIEsET. GEN. ]-2AC TUBBO OIt FUTf

PEZS HIF LBI2 tII

PFZR HIR t8I I

HoT'0'NOIEI I

'0'1

MCC FllC ( aREa ?, EL. s6s'l MCC FllD ( aREAr,EL. s6s'rMCC FlIE

a ( aREA 8, EL. 545')

EUA

CONIiCIOR

COilTRTCIOR IO RELOCIIT BI(RS FROI{ UCC E22A SCHEITSBE22l7, BE22l8, BE22t{ AND 8E22r5.

INSTALLATION CONTRACIOR TO IHSIALT IODITIOHAL VEFTICTTSTRUCTURE T0 r{CC FrzC, HCC il14 & Fl?A & HCC FllE rflo r0crrEEXISIIHG STARTERS IS SHOT$.

STAR1TR OR COTITACTOR THICH RECTIYTS A SIcIIAL FROI{ IHESAFEIY FEATURES ACTUAIION SYSIEI{ I5FA5I REF. OTG, E.I?8,IN5TALTATIOti COIITRACTOR TO INS1ALT IN EXIsTIIIG sPACE.

IHSTALIATIOiI COHIflICIOR TO REHOVE LATCHIIIG TIPE STARIERANO REPIACE TIIH FVIIE STARTER.

'0' l-l1t0'0' HOIEi l5 I 004 t00A 5 t5 It

ot'#-

El- SPaRE

BF I te9DA NORI.{ SUCTLINE 2 150 vlv

BFIEC

ri

t5IHU

0lr

BF r r850H RHaovAr

BFI I t5FD FRl,l IICC FIIA

il17 l{vHP5 I BFil9tFO TRH HCC FIIA uvl 5t 80 Ptf 2

PI,lP

8A rfi Ff 2 I50 VLV HP INJECIIOI{ PUI{P 2r,ilu. REctRc, LIriE I50 vLCLfl '0' '0'

U

l5

'0' t50/t5 A sTARIER 0R cor{IAcion rHlcH RECEIvEs a stcNAL FRol THE srErflANO FEEOIATER RUPIURE COITROL SYSIEII (SFRCSI REF, OIG. T.198.

1 t5a SPARE36 BF t9 BF

HV26490 BF 7l BF I t6s 8F1195 tv0H6lLPI-HPl cR055 CoHr{I5O YALVE ?

gFtl9ZECCS nH il5CTB fAH I

r.rc0lilI.P INJ ? VLV HP INJ 2.I CT YlE IO

LINI 8 VLVl0A

BA ADO TK 2HTR IftcruPlf2

AUX CT.AR LUBEtt, l0l t50t15OIL PI+ ri

DAVIS-BESSE NUCLEAR POI.IER SIAIION

4BOV AC MCC (ESSEI-ITIAL)

ONE LINE DIAGRAi'4

[-6 SH. 2

F IGURE 8.3-24

tl HOIE I8F fi BF t4t BF {5

BF157 l

AFP 2 SUCT CIIII H2 PURCE

FTN 2 5T IN VLV

tccs Rr ll5CLR FTI 38Fil78

ECCS R[ ilsrtv & Ac t50 '/tv I

NOTE 5flo 1 5

NOTE 7t50/t5 1r€ '0' il0i8Fil42CTI'T H2 PIJffOEOUT I5O VLV ?

8Ft t5 cIII. Etffl. sutP l'ivoll09t l5t

BFI!798rrrr?8i r00HIR 2

I(2

REVISION 32

SEPTEI4BER 20IB

?J

1r 2t

il

HP INJ 2 VL

OH PTIP 2sUCI vtv fRX 8I5I

ECCS Ril 115HV & AC ISO vlv 2

OUI VLV.

BFI!8?BIIIERY CHIRCERD8CzPI{ FEEO

rEIl22

PtP A PI.F 8

!- SPARE 60t'0'

r0 HccF ltt ECCS FL t15

cLR tatr 2

-p,

DB 05-08-]8 OFN.I :/EL[C/E6SH2.DCt,|

101

FROM ESSENTIAL NCC E12A

BATTERY CHARGER

DBCIP

4BOV J• AC TO 125 VDC

600A

STATION BATTERY IP

FROM ESSENTIAL MCC El 10

BA TTERY CHARGER DBCIPN

480V Jo AC TD 115 voe

OOOA

FROM ESSENTIAL MCC E12A

STAl!ON BATTERY JN

BATTERY CHARGER

OBCIN

480V l• AC TD ' 25 voe

600A

DC MCC I CHANNEL I

10106

fo101 Dill Elo£RC. LTC. FD. 1 0112 EMERG. LTC. FD. 3

{oll5

~ ~=~ ~:'.'.§; ~~­_-'!J< ~g~

r ··-··-··-··-··-··-··-··

rA ;;R 01 lJ RCP . BACK-UP OIL LIFT PMP. 1-2 0114 RCP. BACK-UP OIL LIFT PMP. 1-1 01 15 MFPT. I EMERG. BRG. OIL PMP. 0117 RC. KJ. PW'. 1 AUX. OIL PMl'. 0118 T ·G EMERC . BRG. OIL PMP. ISEE NOTE 91

DC DISTRIBUTION ~

E·642A,SH.IA,IB Q

CHANNEL A 0

f DAPO I THRU OAP 34

·--··-·-· .. -··-··--.. -··-··· p.c~r10N!

0 I N01 ..EMlLUil!! ! NO j

E-640A,SH. lA,l8Q•

I - CHANNEL J

~ 50A

J; AFPTl MN STN IN ISO VLV IMVO I0601

p C. DIS TRIBUTION .EMl.ELllM

E·642A,SH.3A,3B Q

CHANIEL A 0

f OANOI THRU 0ANl4

ESSENTIAL SFAS SOLENOID VALVES CHANNEL I 480V ESSENl lAL UNIT SUBSIATION BUS El

I : GENERATORITRANSFORMER RELAY BOARO

i ~~~~1;~ m~~~~~~rn 1: ALT 4BOV ESSENTIAL UNIT SUBSTATION BUS El Al T 4.161\V ESSENTI AL SWITCH GEAR BUS Cl ALT EMERGENCY DIESEL GENERARTOR 1-1

CONTROL ROO DRIVE BREAKER CABINET 480V UNIT SUBSTATION BUS E2 4. 16 KV ESSENTIAL SWITCH GEAR BUS CI

EMERGENCY DIESEL GENERATOR J·I ! ALT 480V UNIT SUBS TA TION BUS E2 • 480V UNIT SUBSTATION BUS El

480V UNIT SUBSTATION BUS Ell All l 480V UNIT SUBSTATION BUS [4 4.16XV SWITCH GEAR BUS C2

110 VAC

RADIATION SAMPI. ING SYSTEM SOLENO ID VALVES

SfRCS REL AY CAB. C5762A FROM ESSENTIAL

HCC E 12A

REGULA!ED RECTIFIER

YRr l 480V l• 125 voe

FROM ESSENTIAL MCC E16A

cvr 480V·I• 110V·I• IOKVA

__.!..,,, A

CHANNEL 1

f YI03 THRU Yl21

REACTOR PROTECTION SYSTEM-I SAFETY FE AIURES ACTUAllON SYS!EM· l ESSENTIAL RADIATION MONITORS ANO

SAMPLING SY ST EM ESSENTIAL Sf AS SOLENOID VALVES CH·t

INDICATING LIGHTS AUX I LIARY SHUTDOWN PANEL SUPPLY CH·I CONTAINMEN T GAS ' H," ANALYZER CH · I FREEZE PROfECTI ON PANEL CFPDlO FREUE PROIECTION PAHEL CFPP I 00 EMERG. D. G. 1·1 ELECT. CTRL. ~RELAY BO SF RCS LIXilC CAB . C5/6 1A SFRCS RELAY CAB . C5761A

~FROM YAR ESSENTIAL M INSTRUMENTATION

0 OISTRJBUTION PANEL YIA

YIOIA CHANNEL I f Yl03A THRU Yl22A [·908A Q

ESSENTIAL POWER SUPPLY SYS IEM CH·I

! !ti :~~~~N~~il~~simo~u~u~/4 : I l. 8KV SWGR. BUS A LOAD BRKR' S I NORMAL IHAOI 1 & SOURCE BRKR ' S : •LTERNAT[ IHAACJ l ~frnf5 ~A~:~~ATION MONITORING CABINETS: ! SFRCS RELAY CAB . C5762A ! i i r··--·-··-·' :

I r··-··-··-··-.. -··-··-··-··-··-··-·--··-··-:

FROM ESSENTIAL MCC El2A

REGULATED RECTIF IER

YRFJ 480V J• 125 voe

! i i i i !

I l. BKV SWGR. BUS A LOAD BRKR' S ALTERNATE IHAOI 1 & SOURCE BRKR' S NORMAL I HAAC I

ALT. GENERA T ORITRANSFOR~R RELAY BOARD

:··-··-··-··-·r'RoM-··-··-··-··-··-··-;::-.::::::-J_ .. --1---- ! MCC E2lA i

cv r 480V·l•I 120V·I• IOKVA

__.!..,,, A

i B i i 1~r~~00:~A [{" i

1i~n !

0

i ! i !

C,~ i A 15 i

0

PO~ER FROM YAR

i.·-··-··-··-··-·-··-··-··-··-··-··-··-.JlW!lllli.

110 VAC

INSTRUMENTATION DISTRIBIJTION ~o

E·64JA, SH.5Q

CHANt.fl A

f YJOJ THRU YJ11

REACTOR PRO TECTI VE SYSIEM-3 SAFETY FEATURES ACTUATION SYSTEM·l FREEZE PROTECTION PANEL CFP050 IALT. J [ M(RG D.C. 1-1 ELECT CONI & RELAY 80 Cl615 R£LAY CAB. RCl603 BORATED WATER STORAGE TANi HEA T TRAC ING CAB. Cf P050

··-··-··-··-··-··-··-··-··-··-··-··-'

LOAD I <0£SCRIPT!<Jll

f YARDl lHR\J YAR2 1

NNJ FAN Y FOR YAR I 0 !SEE TABLE I & DETAIL I J FOR IARl8 <SEE !ABLE I & OE I AIL II FOR YARl9 ISEE TABLE I & Q[TAIL II INVERTER YVA <POWER! BUS YI I SEE NOTE 71 BUS YJ I SEE NOTE 71 BUS YIA <SEE NOTE 71

TABLE I

LOAD 2 LOAD l LOAD 4

UNI NTFRR!IPTARI E INSTRUMENTATION

DISTRIBUTION PANEL YAU 0

E-64lA, SH.J, 2 Q

CHANNEL A

f YAU02 FOR Y AUD7 . TO YAU26. YAU4B, YAU53 SEE DETAIL "I "

IZONE J-101

FEED 1 FEED 1 <NRMA I IA f£RNAT I

STATION ANNUNCIATOR HORN •2 HORN •I COM~N.IOATA TRANSMISSJON YBU52 YAR l9 YSW1 C5759D NON-NUCLEAR INSTRLMENTATION SYSTEM X NIA NIA NI A YBUSI YARIO YSWJ C576DE NON-NUCLEAR lNSTR!ilENTAT ION SYSTEM Y NIA NIA NIA YAU26 YBR20 YSW4 C5761C INTEGRATED CONTROL SYSTEM NIA NIA NIA YBUSO YARl8 YSW5 YATS4601 YA 114601 I C 460 I CIC575JCIC5 7S1E!C5 751C I NIA NIA NIA YAU07 YBR09 NIA YATS5! 01 PLANT COMPUTER AUTO TRANSFER SWI ! CH NIA NIA NIA YAU48 YBRl8

FROM ESSrnTI AL MCCF12A

FROM ESSEN! I Al MCC Fl 10

FROM ESSENTIAL MCC F12A

Sf!T ION BATTERY 1P

BATTERY CHARGER _..__ BATTERY CHARGER

OBC1PN BATTERY CHARGER

STAT ION BATTERY 1N

-----

• 125 voe

OBC2P

480V l• AC 10 125 voe

600A

0101 JOA f 0206

400A I OA IS[[

NOTE 61~

"' ~ ~g~ ~~~

~~i

.llill!Illi. 0 C. QISTRIBllTION ~

-----...!IL

-----~

··-··""! !

D2POd i

1l -1 i

D2P04 : 200A ~

!

<CHANNEL Bl 0211 EMERG. LTG. FD . 1 0112 EMERG. LTG. FD. 4

480V 3• AC 10 125 voe

600A

0213 RCP. BACK·UP OIL LIFT PMP . 2·1 0114 RCP. BACK-LIP OIL LIFI PMP . H 01 15 l.fPT. 1 B£RG. ERG. OIL PMP. 0117 RC. MU. PMP. 2 AUX. Oil PMP. 0118 T·G H1 HERC. SEAL OIL Plf'.

D.C DIS TRIBUTION ~

E-6421,SH . 2A,28 Q

CHANNEL B 0 f DBPOI THRU DBPl4

ESSENTIAL SFAS SOLENOID VALVES CHANNEL 2 ! [ RD :sn ~~si~u:\i~I ~wi~~~~mo~U~U5/ J ! ~i~~~~G~Ri~:~~n~~~R R 0~ELAY BOA

DC MCC 2 CHANNE L 1

800A NO 0221

0

DBC2N

480V l• AC ro 115 voe

600A

100A

ALT 480V ESSENTIAL UNIT SUBSTATION BUS Fl ALT 4. I GKV ESSENTIAL SW ITCH GEAR BUS DI ALT Et.fi:RGENCY DIESEL GENERARTOR I ·2

---------------T

Q C QISTRIBUT ION ~

E·G42A,SH.H,4B Q

CHANNEL B 0 f DBNO I THRU 08Nl4

CONTROL ROD DR I VE BREAK ER CABINET 480V UN IT SUBSTATION BUS f2

El£RGENCY OIESEL GENERATOR 1 ·2 j MAIN TRANSFOR/oER I RADIATION SAMPLING SYS TEM SOLENOID VALVES CH-2: GENERATOR VCLTAGE REGlUTOR CABINET SFRCS RELAY CAB. csm ! ~[~E?a~~Ru~~~L~~~sm1~~ ~~,~~T

48DV UNIT SUBSTATION BUS Fl<ALTl 480V UNIT SUBSTATION BUS f~ 4.16KV SW! ! CH GEAR BUS 01

FRD~cPfmlAL ! ALT :~~~ ~rn ~~gmn&: g~~ ~~ ! ~~:a:v 1 ~~R:w~G~HBG~~~B~~x~?s NORMAL

FROM ESSENTIAL MCC f 12A

I l. BKV SWGR. BUS B LOAO BRXR' S ALTERNA TE <HBO 11 & SIXJRCE BRKR' S NORMAL IHBl41

ALT . GENERATOR/TRANSFORM[R RELAY BOARD i <HBOll & SOURCE BRKR ' S ALTERllATE IHBl4 1, ! ~~~~~to&v~~!)l~TIDN MONITORING CABI NETS i

TURBINE BEARING LIFT PUMP TEST CIRCU IT

REGULHED RECTlf IER

YRF2 4SOV Jo 125 voe :-·-··j SFRCS RELAY CAB. C5792 i

i ··-··-··-··-··-··-··-··-··-··-··-··-··-··-··j

REGULA TEO RECT IFIER

YRF4 480V Jo 121 voe

! !

F RO~c~s~m l AL i

! ~-..l--X-Y2-i

! !

CVT i 480V· IO/ i 120V·I~ :

-1lr· A

FROM !BR

IOXVA !

ESSENTIAL !N~ON .filfil!MlQti ~

NO E·641A ,SH.2A,2BQ CHANNEL 2

$Y103 THRU Y212

REACTCR PROTECTION SYSTEM·1 SAFETY FCATURES ACTUATION SYSTEM-2 ESSENTIAL RADIATION MONITORS AND

SAMPLING SYSTEM ESSENTIAL SfhS SOLENOID VALVES CH-2

INOICATING LIGHTS FREEZE P.1DTECTION PANEL CFPD40 AUXILIAHY SHUIOOWN PANEL SUPl'l. Y CH-2 CONTAINMENT GAS ' H1" ANALYZER CH·1 EKRG. D. G. I ·2 ELEC T CTRL & RELAY BOARO SFRCS RELAY CAB. CST92 FREEZE P.10TECTION PANEL CFPPI 10 srncs LOGIC CAB.C5792A

CHANNEL 4

$ Y00lTHRUY411

REACTOR PROTECT IVE SYS TEM· 4 SAFETY FEATURlS ACTUATION SYSTEM-4 FREEZE PROTECTI ON PANEL CFPD60 IALT. I EMERG D.G. 1·2 ELECT CTRL g

RELAY BOARD SEI SMIC RECORDING SYS. C5764A

0

POWER FROM YER

RfGULATED Ltr l N!ERRUPTABLE INS fRI IMENTA TION I NSTR!!MENT All ON

DISTRIBUTION DISTRIBUT ION ~ 0 PANEL YBU 0

E·64lA,SH.6 Q E·64lA,SH.3,4 Q 120 __ vA_c_....., _____ c_H_AN_N£-.L..,a_ 120,_ _vA ... c __ Y_Bu_o_1 ___ cH_AN_N .. EL_e __ f YBRO J THRU YBR21

NNI FAN X !CS FAN RAC'< Rl001,R300J INVERTER YVB IPOWERI & ~us Y1 ISfE NOTE ll

-CUS Y~ !SEE NOi===:::>

FOR YBR09 ISEE TABLE I & DETAIL 11 FOR Y8R l6 !SEE TABLE I & DETAIL 11 FOR YBR20 ISEE TABLE I & DETA IL 11

FEEO~;-r, QllilL.L ~

TYPICAL LOAD4

) DISC. SW I

LOAD I

DI SC. SW 2

f Y8U02 TO YBU53

FOR YBU50. YBU5 I, Y8U52 SEE DETAIL "I" I ZONE J·IOI

INTEGRATED CON TROL SYSTEM X·BUS COMPUTER COMMUNJCATION SYSTEM B

d~~OR~~~~~~ilo~0~~~~~irlON & ROD or. IND GENERATOR VOL !AGE RE CUL ATOR CAB l NET GENERATOR CODLING SYSTEM CABINET EHC AU XI LIARY CABINET C5757C NON NUQEAR INSTRUMENTATION X·BUS MAIN FEED PUMP TURBINE 1·2 CONTROL RADI ATION MONITORS CH·B MISC. ELECTRONIC CONTROL CAB INETS SOLENOID VALVES CH·B INOICATING LI GH TS RCP I· I · 2 SPEED SWITCHES RCP 1·2·1 SPEED SWITCHES SfRCS RELAY CAB . C51911VIA Y4502 1

REFERENCE DRAWINGS E·I AC ELE CTR ICAL SYS TE M ONE LINE DIAGRAM E-1 15 KV ANO 13. 8 KV METERING !NO RELAYING ONE LINE. 01 4CRAM E-3 4.16 KV METERING AND RELAY INC ONE LINE OA!GRAM

E-4 48 0V UNI T SUBSTATION ONE LIN[ DIAGRAM E-6 •BOV MCC <ESSENTI AL!

E·IOA STANDARD NOTES ANO SYMBOLS [·64DA ESSENTI AL 125 YOC OISTRIBUTJON PANEL SCHEDULE

E·641 A ESSENTlAL 120 VAC DISTRIBUTION PANEL SCHEDULE E·641A NON ·ESSENTJAL 115 voe OISTRIBUT!ON PANEL SCHEDLU: E·64lA NON-ESSfNTIAL 120 VAC DI STRIBUTI ON PANEL SCHEOULE

OS-0060 SHEET 1·1501125V DC AND 110V INSTRUtlfNT AC SYSTEW

OS-0060 SHEET 2·1501115V OC AND 120V INS!RUNENI AC SYSTl:M

NOTES I . • MA IN CONTROL BOARO MOUN TEO. 2. 0 All IT[MS ON THIS OWG. ARE O·LIST ITEMS, EXCEPT F'OR

EOUIPMENT MARKED WITH 0 . J. DELETED 4. DELETED 5. llllB •••• MAKE BEFORE BR [AL

6. THIS FUSE I S NORMALLY REMOVED WHEN NORMAL SOURCE I I USED IE. l!llEN 0101 AND OIP OI ARE CLOSED 10 132 ANO! OJNOI . 0202 AND 02POl,02Jl AND 02NO I J. VWEN ALTERNATE SOURCE I S TO BE USED FUSE MUST BE RE-INSERTED PR I OR TO CLOSING SWITCHES 0201 ANO DI P02 ID2J2 AND DIN02,D 102 ANO 02PD2,Dlll ANO 01N021 ALTERNATE SOURCE IS FOR MAINTENANCE ONLY . IN ADD I 110!' . THE NUCLEAR PLANT 14JST BE IN COLO SHUTOOWN REGULATED INSTRUMEN7ATION OISTRUBUTION PANEL "YAR' IYBRJ CAN BE USED AS ALTERNATE SOURCE TO EITHER POJ:[L Yl,YIA OR PANEL Yl<Y2/Y2A OR Y4l BUT NOT SIMLLTANEOUSLY. ALTERNATE SOURCE IS FOR MAINTENANCC ONLY ~ THEREFORE NORMAL SEPARATION REUJIREMENTS ARE NOT REOURIED. SEE YAR <YBRJ PANEL SCHEDUL E DWG. E·64JA SH.5 !SH .GI FOR AOOITl<JlAL NOTE REGUARO!NG FUSE REMOVAL AS APPLJCABLE.

8. THE ALTERNATE PO>{R SOURCE YAR <YBRI TO INVERTER 11 1 1~ THE INTER GAL STATIC SWITCH YVA IYVBI SHALL BE MANUAL L"f DEFEATED BY OPENING DIS CONNECT SWITCH YAROJ <YB,,0:51 'llliEN PAflEL YAR IYBRI I S rm FROM PAJ.l:L YBR <YARl.

9. THE DISCONNECT DEV ICE FOR THE TURBINE G(NERATOR EMERGENCY BEAR ING OIL PUMP 101181 rs A MAGltETlC Bfl[A!ER ONLY WE ST INGHDUSE IYPE ~KA RATED 125170 AMPS.

10. MBS .... MANUAL BYPASS SW!TCH. STS .... STATI C TRANSFER SWI TCH.

11. REFERNCE E ·9 FOR FURTHER INSTRUMENTATION LOADS. 12. DEL ETED

13. DELETED 14. FOR DC OISTRl6UTION PAHEL SETTI NG SEE DRAWINGS

E-B54Q ·ll,72,7l, & 74 ISC!l. 15. 0 REFERENCE DISTRIBUTION PANEL SCHEDULE FOR

COMPLETE LIST or LOADS. 16. REFER TO TABLE I FOR DE IAILS FOR SlAll ON ANNJ.NCIATIOR

IYSWIJ, NON-NUCLEAR JN STRUNENTATI ON SYSTEM X IYSW2 1, NDN·NUCLEAR INS TRUMENTAT ION SYS TEM Y <YSWl l . INTEGIRAT ED CONTROL SYS TEM IYSW41, YATS 4601 I YSWS J AND YATS57 01 .

DAVIS-BESSE NUCLEAR POWER STATION 250/125V DC AND INSTRUME NTATION AC

ONE LINE DIAGRAM E-7

FIGURE 8.3-25 REVISION 31

OCTOBER 20 16, DB 06-0 7-16 DFN= ! : IELECIE7 .DGN

1-•vJ l-4• tL- ~101.or·-------

-+··

3"K>83A.·3"uP To B'!loW,..O!>O SU £•111.7

p..1w •ll~ ~L- S<j, .•. ----- • ---·.

,...'f!I ••. LL· 1'a<it,r----- . ------- ---

1:1... 'J~'5·-11~j_-+------

~t,~<'. "'; .... ::

P"Pta:L

l)

SECT ION• B-B·

0 J c u

"' _; 0 .,

FOR CONT!NU ... TION

k"'-lt: Vt",1'-d('O"HC.. E·Ui-, I E· 31.<.)

i I

0 ~76 -0-"'75

NOTES I.A.LL CNO's. "l"O K 1"z

0

uMLt.~ NOTU> O"Nl<R.""1111. !. WtC.tlS. C:OND•TIONS ~hU"f T\4S MlNttr"''JM ..... C\N~

UTWl<DI CIENTli'.RS OF ""'Y ,._ ~·£1)11[11 CND'S. """~'­BC THR~C (.')T1M'£' 'TM&'1'- Ms.R.~6. NOH'\Mlrl\. f.IZ~.

!I. A.LL 91lMO'£ 1'Rll .~· M1M. R."'OIU~ .. LI.. ~1'1S lloQ!i; tA" w1l>l. ~l!.S'!o NO~D OT>'llR .. ISIL

.... A.U,. C)trlD. WlT'°' lit.N 111. "QS. N~~ ,M,TtllUM';.MT•~•O"°' "St"f'!.T~PiA CNU C:-oR R&.'9T1:t.lC.T1cw." sa.a MOTe, 4. OM 'DWG,.. ~-SC'.'

!o.1'.LL '-M81<0DEO CONDUIT$ "•OT Pio.RT OP cc-14

£·3008 ;.- 'l01 "'-£ .3co& 1-'!'o~

£- ""i;. to-'!'o-c- 3"7 S.- S49 ll· '!'olo, li-1170 l.· 37•

&.·"3"?4

REFERENCE DWGS. E.L..E.C.TAt~llrt.L fUM::1i.'H•"f "-C~UL.t. ;.ROUNOIN .. '£Ti..N01'.R0' f Ot;.T0.11..'!'o IU<:CW'"l 4 c,ltOUNDl'"'t CO..,. .. ,N .... "N'T 1)£1"A.1L'i. 1'1~£-'t 4 ""°UNOINC, CONT"IN,.5.MT t;.l .. !. ('!>lo'>·O) 1'111.C£WA.1 - .,_,_, .. ,. co .......... ,MT s.1...11 ( S8'!.-o) lt .. CllW .. 't 4 C.-MOINC, COMT .. INl•llU•T liL.4 (li011-0)

~~~~J ~ ~::'u'::~'(. ~.:,~~~~~ ::;.~,._c.;!13-o) :~;~;:,ll \~~=~"a.\,:."'r~·~~~ .. ~!~J, ~~':,~.0) C."-i.~IC."-l.. P~ .. S,Tq,llTION arr.1tl\Q1'T. CCtotT ... tNtrlis.t<lT V .. '!. .. &L RlloCIL>N .. l O&TO.ol. ... C<>Nt"A.lMMli'.MT ~Lt ('ic.'S-o)

MARGINAL QUALITY DOCUMENT BEST COPY AVAILABLE

DAVIS-BESSE NUCLEAR POWER STATION

RACEWAY ANO GROUNDING CONTAINMENT DETAILS

E-362 FIGURE 8.3-31

REVISION 24 JUNE 2004

Removed in Accordance with RIS 2015-17

DAVIS-BESSE NUCLEAR POWER STATION RACEWAYS CONTAltllNT

EL. 4 (603) E-366

FIGURE 8.3-32

REVISION 30 OCTOBER 2014

• '1·15•14 IJIW--...CIT

\ . !! ., • ~ .. ;a ·.i

~ ... ;r .• ... '! ... ·= ~ 'o! : s t : l :: .. .. .. J rs L • J;

> ~ .. • ; .i ii 6 ; j _; J J , 0 0 8 a 0 0 0 0 u u u v " v u u • I

I I I I

I I I I I

I + I I

~ HNT. ., ...... './) I

lfMIM!l'I ~

,.,,

SECTION °A·A \C...._, "•"•1'·0·

r----I\ \ ..,,.

! .. I ..

-- .,

·= ·.c :z ... .. ... ...

! !! 8 I: ·: • oS .. "' D u

~ .; s ; 1 ..i g 0 0

I . .. - "

.. ,,_

. ~~.: ... .' .....

••. "4'·:11•;•.·,

SECTION°B-8° ~'Ji\!1-·(-o"

. .. • • _; 9

.. ·: • .. _; 0 u i

~1i.TR ... TtON Ro'# & U •• Ge,IO~a·

-~~~~~. H-~-+~~~~~~~~~:.~!~ ROW 9

'P'IP'$M

•.;. ···~'. :. .

B

I. 'FOii. ll'&tE.TA. .. TtC* TalMt~ llCIK Oll9'1ClN,,,.TK)MS Sll.1i. KCT'~ ~ Ofl .",...

l.1oP--.R' 9\.0CM.OU~ ~1. 6C ~ OJl:r ._,,ITt-4 CE.L\,l,A,,MI' c,or.E.. "Pl E·JQZ. SHI~ •

.S.JIDCl"lllATIMi ~ ax•ft:ll.....a. U1U Falt ANNAJfiA allllCK. ............ ~-

.. ._. ...... ,...._,,.,. ,.....n1A,..... ~ ftl.~tCK sea Dail&. •·14-t .......... .

REFERENCE OWGS. C.l.~'T9'.t4:A.\. A.""C:E.W"'f ~OU\..~ c.liOJfrilOtwe. t.'tloMOMlD'\o C °''T"''-'Tt &.utc.,.R.tc.N.. t.,."MOMlO' • OG.1'1',\.'S

~~~~ t;:-u:·,~ ~i:.'::"~; ~:~z:~) A.frloe4.'fllA1 - tt."DUNO\ .... CONT"4f01 ..... '1' 5\.. "!' (.•1191') A.llrti.Ctl'ffl\"f f C,,Ali)UftOMt;Qr, CON'l ... \""'-M't' OC.Tflr1U.• ll""C,1&.W"'f If CriRQ\MOlK .. CQtrtT .. \Mlll~'-T G.L.5'.,.;.) S.\,. .. C.'Ttt.1CJli4, P&.MW....,.A,,"'l'IOM. ~Gi.T. CC»(T ....... Mll.N't "'°'!it~ .. :a'?e a Q..C.C.TQ.tclio\. PO'fi.TltA.TlOM DC,T-..i\.."S

MARGINAL QUALITY DOCUMENT BEST COPY AVAILABLE

DAVIS-BESSE NUCLEAR POWER STATION ELECTRICAL PENETRATION ARRANGEMENT

SHIELD BLDG E-370

FIQJRE 8.3-33

REVISION 24 JUNE 2004

C0"1i.R E.X.POS.EO NOZZLE E.C~E WITH NEOPR~NE. MOLDING OR APP,Vl::D O:QUAL.

l?aH.IELO eLD~. { t~<.:;t)

lllSIDIO ..,.R,., eox (.,.. ...... 511o)

LOC. .. TIP

'T--t----...;;;.......J'"~'" / Pl:"--'-"f-:Diiior. L 'Zll211Vt -:::!::::::::/'

/ l"CND v.!:~i,C"lo"L ~....,__, FIEJ.010CXWYEc:T LENciTH

C.0PPE1\.GRD BUS 01' ND. 4~ CA8L£ 10 6NO 4/0AW& !'U47E (lEt DETAIL SN·3J

TD BLDG- STEEL WITH 4/0 Ll.tt ( z. ~." /JOLT:J

f/El.D n> CONNECT CA8LE--' 10 5P;!Ce.f! fSHEET 'I:·· W/111 4/0 ux, ( ~-Vz • .&x.73 RJli liofOC.Wew<; OF CND 's,

4.4-1i• UlVU VDLlll&E AND IN5TJI, PENETRATIONS RE~lllREll tT~PE Z.~3) IPTE.S CD-1. 8. DETAIL OF BltlCKOJT SPACER 5Hf.ETS ANO GONCUT:!I A:!! SHOWN IN THE

SHIELD HLDG. \'\IAU....18 NOT' Afft..ICA6LE TO PeNEfRATION AL~W~Pa.'l.C:.. A ... CCREl:RILL H"'5 BEEN PROVIDED IN5TEAD .. THE 4/0 GRQIMllD C.A~LE SHALL e£ ROUTED DIRECTLY 8ETilrilEEN JIEttETAATDN ~ ans DE BO'll """' THE fit'" c.tlREDRILL.

q, flUIMING :!TRUCTVRE fOR FIRE WRAP 15 ATTllCMEl> TO PENETRRT ION NllZLLE

·-·~~: -.··

FOR PEllE.TRATION P2.CSG.,5EE Wl6, E-1i,,1! AIR l>ETl\ll':> lRE'f', ClllL, C-C.S5-13ol5.00"Z.), IO.FlllllllUE. SfRUClURE FOR ARE WRl\'P' 15 ATTACHED TO PENETRATIDN 11,1'.JZ.Z.LE

FDR PENETRATION PIP31hSEE. llWG. E-IZOZ.B FDR ~ETlllLS CRoF. CRLC. C·C55-1!1:1s.OOZ),

.~-~;; ·f::':!.":~· -~~:,, '._ ·. ·,p..:

~LINER __.15" so.

!!.E.AL CONDUITS.

.·.

AND l'.LL !!.PACE.So llE.TWE.E.N C.ONDlllT!!. IN S.MILLD i.LDC,, WALL (1.E.E. NDTE. 7)

11. fKJIMING STRUC.lllltE. R>R. Fl"R~ WMI' 15 lllTACltEO .lll PEUETY.l\TIOJJ"1(DZ.2.LE - l'ElllE..TIUITIDU '?il\.'11!., 'SE~ DIN&. E-1,,'1'0 FOil llETAI L .. (RE.f. C.AU:. c.-css-1:1.1 ... 011.),

TACK WELD CND. SPACER SHEET 'C', WITH ROUNDED FIGURE I CORNERS, TO~ I X I ANGLE.

I FOR PEN. P2L2C & P1L5W ONLY

OUTSIDE TERMINAL BOX mwc. E-377)

C.NO. BUS.HIN.c;..S 'LCCKNUTS

I" CND 4/0AWG TO &.D6 STEEL GND~ID

NOTES 1 .. FOR SPA.C.~R SM.EE.TS ti C:.N.0. i\.RRl\NGE.-1

ME.NT • SIU:C SE.E. "'"E.IOTS Z. t 3 '2.. FO~ DETA..ILS or Nol.ZL.E SE..'i:. i

'il~-E.'2.IOA. I 3.FOR 'BOJC. 51CH11:.DUL.E .j \.DCATION OF P~N.ETR.A.T\Ot'll"D ~E.'e. O"INGi,. NO'Sa. E.-"a"JOE.,, E.-"all E..

4. ALL WORK B'/ CDNTR.AC T cc-14 E~CE. PT A.S. NOTED.

"' Gt.SE.e. A.MPHE..NOL owc;._ i:,ooo 4(c.C,t. (E.-ZS-3) FO~ T'iP. PE,NE.TR#)..TIOl\l l'!lo"'Y· DE.Tl>IL5.

7. SEAL SHALL BE I'S SPEOFlED IN 0.C, 114'il-E·30ZA SH.- IG

DB 6-14-12

DAVIS-BESSE NUCLEAR PDll:R STATION

ELECTRICAL PENETRATION DETALS E·J78BSH. I

FIGURE 8.l-34

REVISION 29 DECEMBER 2012

DFN•J 1 /RASDGN/E378BSH1 .DGN/CI T

GAL"-':.TL.CNO. SPAC:.e.R S"E.E.T 3/ 1 to"T'°'IC.K.

.!> ~ ..: ;:.: "" '° --t-----1---'1:4

CND SPACER SHEET TYPE II

, _ .,_ .. t.NO. PER. /.'>..~S"'f. 2.- 3" C.NO. ~R ~S.S'f. -~ "-SS'E..MBLIE'St RGq.

~~ t-~ +--.... • . . i

~ I

CNO SPACER SHEET TYPE ill 7 -1'lz" C.NO. PER ~'S.SY. ? - 'Z. • CNO. Pe.R A.SS'/ 3'- 3" C.NO. PE.~ 11.SS."i. I AS'iEM6\. 'f REQ..

NOTE:. ~ OE.t;IG.N~TE~ CNO. use.o l=oR <qRo. 'Nt~G.

UNL~S':> OTHI:.~ 'IN 10:,E NQIE. D IN t:·l'I~ = ·:_,-:_ .., ~~ ":;M2!)

• DES.1c.,N1•.;re:S C.NO'S ..... ooe.o Fvl~ P'ENE ;-;-<l"\llO!'t A':>':>f" l'o'\1-'>~.1 "::':> Pl>.L 2."11 P~l-IE:; {'t'>L ""~, Pt;L4-E. PAL.30 Al'lC PC.\..*'H ON\..'f.

CNO.<;.PAC.G.~ I PENILTRA.T10N A«;..~~Ml:,L"f ':.HEE.T TYPE.~ _ OES1C,NA.TION~ .

I

Pl PZM,P0P4A, P"P48, Pll.P 2. P PBPS~Pll.P~a. PSP•O, PePso PC.P4N, PC:.P4P, PC PLlq, Pc P <:, N Pc.P'E:.P,PC:.P~ PtC Z. L ,P2.C. ':>C"\,PAC:..1N , PAC ~E. Pec:i.o,Pec:. 3~PSC 40. PCC.4-T ~C.C.4U PCC4'4 PCC.Sj PCC. SU Pee.~·./ • ' ?tLIL ,PZ.L4C,,P3L45 ,P4LI Cy PAL~0 1 Pi:i..l.'lN,PSL1E. ,P9Ul €. PeL3q,PC::.LZG. PC.LZ.F, PC.\. '?..C, CCL4-W

m ?A.P3F'

NOTE.: 1.01ME.NSI01'l0:. NOTt:O A A.PP\.."'f TO C:ND

SP,::\C. E. R "'::.1-\.@0NL "'/.

?.THQE~ CNO. SPAC.ER ~HE.GTS PC.~ PE.NE. TRATlON l<E.q. MIOOLE. Sf=1AC:.E.R TO eG:. Two 1NC"°'IC.C:. Hl'-"'E.R A.ND TWO lt..&C:,~t:.S 'N 10 IC.R. 1'H AN EM 0 <;.P~C:.. ~R. S" ~E. TS.

3. ll OESl~AATU r c.ND ADOE.D ~ PENETR"TICN A5S£Me.i..1es Pl!IUE \ P?>l.~ ONl."'f

DAVIS-BESSE NUCLEAR POWER STATION

ELECTRICAL PENETRATION DETAILS

E378B SH. 2

FIGURE 8.3-34

REVISION 9 JULY 1989

1~

12.''

t/1.£.JVAA CND •. 5PAC£~ SNEE! TYPE J2 2· 45/t/JCND PER ASSY I· 2Yz., ~D PH<. A~Y 4 llSSEM&JES ~ GALV STL ~E£T ~I#" 1HJGK.

C..NO SP....CER PE.NETRAT\ON ASSEM8L'( SHE'C.l' TYPE DE5\GNA.110N5

NOTES \ D\MENSION& NOTED A APPLY ,.o <:,ND.· GPACER

SH@ONLY 2. lWO T'\'PE m CNt>. SPACER 5HEl:fS PER

PEN'E\AATlON REQUlREO 3. '¥ OES\GNATECZ, C.NO USEO FOR GRD. WlRE

C.ONTA\NMENT VESSEL.. (EXIST.) ANNULUS SPA.C.E VAAlE~

L.------~(~-4-:-:_-3-:::-:: -1'0-4~.-<o"""":i.:-;-")-------+f-._--------~~.....-TAO< WE.LO CND .. SPf\CER

(, I If ) SilELD 6L.DG. \.2:-to t

f\ E.U> 10 CONNECT lENGlH OF 4/0 CA~L£ TO 4ND PLA1E. W\T\i 4/0

LUG e. 1.-lY1" ~OlTS

WELD-NECK FLA.NGE

10%"

1'14" DIA (TYPE I) /

11 DIA {TYPE.5 Z~3)

Y2110IA (2 PL;:/C£S)

I~

<t G,R.OUNO PlArc Y4# STl-PLATE(t;,AlV. COATED)

Slt&ET ~ > WITH ROJNOE.O CORNE.Rf>, TO SX\5TlNG lXI .4NGL.E

C.ND &U~HIN~S> f LOC.KOUT~

OJT&\OE l'ERM\Nt\L. eox (.owe,. E·~nl)

1''C:ND 4/0 AWGtTO

G,ROUND QR.ID

DAVIS-BESSE NUCLEAR POWER STATION

ELECTRICAL PENETRATION DETALS E-3788 SH. 3

FIGURE 8.3-34

REVISION 25 JUNE 2006

OB 03-13-06 DFN=J:/RASDGN/E378BSH3°DGN/TIF

Removed in Accordance with RIS 2015-17

IIAVIS.BESSE ruCUfrR PO}ER STITIffiTf,CTIIIT CIBIT SPNEf;DIIG STH

rrffiEArfftEEffiE+lc-rsfu:*e-rSLlr)

HflrnE t,F55 'nEustfii 0JltrY l!l8a

(

g.L-C.•3·-·· ac. .... ....-

c. ...... a..•····

SECTION }t" p;Cl ... 11

&L..c:.•s·-a.· ............. o.

~------.

EL. C.2.0'· a· c==-:i . ._.. .......

SECTl'i?'f28-28'

a.-'·· •&rn

~ ..... c-=::'°~-~~=·~=~==~·==~== :::.:>~<t•r,'"-:"-._-L--J ____ ~~{'?' IC\...C:~~= .• =.=.=.11__J __ _c===,===,=i=:_=.;'=""°=.=.-o:::i1_ ~C:'o='--:-==-·---.C.Qi:Jao- J.t....G-o·-·· L--.J C,.M•&

ac;.M.MAI c,._. Cote.·-10' R>&l!J•• CL a.is·-·• t.___J

aC'-CW&t

llE.L..A1'T:.a.• a.c:,,.C:o•

!~·ti-~·; a• i!;~~;;_.,· L--.1 :====~=._=_=a=·!>=~=~=· =L___J====:::./ ~-!.~:·~~· s. ..... a..., . .- r= ~

C.L.Q.IQ.'·CI• --..,•u~••

~-"70

r-.....---., ... ~.Gao'•.. &1...c;i;o,·1• ec,.ac.o1 ec.-c::.01

SE<;WN '8-8· ....

SfCI!flj ·22-22' r-ai

r-.....---., KL.. C..W·H:r -..-oc:11 -

§ECTI~ '16-16.

ci.. c;zo·-a• ac.-c.oa

--~·.s--i ,ec:.-c•• &L..c..2'0"·a· C : : s

ac.P~o-r

~i:__c•===·=:::==========:::::::=·===::t• •c......,.?::J LR~..cJ

CL.. ~ao··•· c==-J c===J M:......,• .._ _ __. __ _., __ .J

-r===i--~--.... r==:l----lt:.:..-:.oo·

._ _______ _, E\-C.IG··a·

r--1'1. -·~-.... &Q -'-c:~ .. ,

SECIJ2~ ·1 1-1 (

c====J &t.,O.•'·C'9

r---------. Ct...C1..,.:.c.·

S£CT!~.f5-25"

Ce... a..•··a· -~ ..

'7 ACI... .......

tCll't.I I

• ..... 0 ~ C::CV- 'Tl:) ~I

MIC IMYO~ ~T'"'~•C..QSL" C•S..- ~--.I c====i I CL..o.c· ... o· Ac:.J18rG;1&

Alf;.~MI.

SFcrn;ir20 -20· -·· r===i aa.... Oa.O'· a•

c===-J ltL..C.•"·1~ .... ~ .. r===

NOTES

SECT1Qt29 -29· SECTl~,.;30-30. SfCTI~ ·31-31· ' ... S£CT!~32 • 32'

IC>l SECTgi33-33. ~·o ... ~ca-~-.

se£ -· &o:I.- - ...

... ~.,, ....... :""'."' .. ·rF---c:=r II :::::~ ....,.....,C::==:=:=:=:=:!1!1~·~.c:~-~A~o0~~

c==J r==tp ~IO'"

C.L-c.aa·.a· •c.l"HC>• ~.._,_ r--.---...

&>..aotW·G" c=J

SfCT9!11°36 :,& ....

i L__J 11.1-.oao'r ~a.A ac.,.c:.io

L--.J o..-•O"" .L. .. A.Oa

DAVIS-BESSE NUCLEAR POWER STATION RACEWAY CABLE SPREADING ROOM

FIRE BARRIER SECTIONS~EM .lY 2 CE-356):..Jt. ~ Sk • i ?)

FIGURE 8.3-36 REVISION 0 JULY 1982

SECT!~ ·39-39· •

5!:::.~ r----1C==L-.c:::.--..1=.c....M==-.==1--__.., AC.eQ••

~~r=::i

~~~c:=::::==~ -======~

~~c:::=:=~~:;. '.,_ .... ,..,. t. .... 01•·.:I .......... ,. &t,...••"'P~G· .Gl"ll:lil!lo

CL.C.uc:;.•.a•

~~:'tf:=L-...J C.\...C:.tG"·O" l.___J

~'E========:::i·~~~··

SECTION Ll8·48· CC·~

·~ZONTAL BEM:>

EL. .:..•·-o.· '---..J A£.~ ....

"VERTICAL IE-0

SECTOJ 49 -49. lb!GI

TYPICAL CU~ TRA;L<DIER INSTALLATION .... --....,,

~-··

SE"C!!ON 45-45. , ..... ,

.c:.•c..•

c======::::::i~~~··

c:=====:i..--~c::=:::i ~--

~)

5ECT~l!!-4(

c:=============:::i~,.1:'!

.§P CEIUM; ATTACHMENT

ElEVAT!OO: EX!ST!!\G TRAY S!.JFffiRJ

--~ -·--,..,.,,,,., ...... ...., .. ~ ....,,.,. .. ur..........c."'~

~ ,,,.,.. ,.e.q·q ..,&. wO'f& •

........ ('TV ... , '

a•,_ • ........ 1 ... , .... ""'-CM. .......... ~ ,9M&&T.....,.._ .... -a TYPyCAL OETAILtSMiP M~IA!. fll§TALLATION

( Rf& s EX!S!ffi TRAY SlJPPOBT

B.EVATION

AC.'¥&.••

.. ll"Otll AOCll'l"llOl.6'I.. ..orc. A..o ~ o...iec.c ....... &-...- ..... ,. ar..,.~.,.......,c~..,~~ ..,.. .... ,,..,...,TM&. ..... ~

v-· '""ID& aT.-...A..,&. ...... &C"" ~ T..J..CO ..... .........,..~Cialro.IWCI:,...,, .... T'• CClflC. TlltA.V CCl'WClll ~

.a,,...·~ ~co ~c.9 T'mA"t" C~ ~ •e C..WT'(al nLET _. ""~- Oli.IC.C•) r--. •T'Cll9 .. ~rOllll~~T(el r&.CTOI~ ~~

A. tk.A.D um-~ •• .,...., ~·-~~c...-..aw """''""' T1114V C'O'V& .. ...,._,.Aii&..l.CD

a. ....c&T ~......_ c.a-N a& r....aT&N&.D a.~ ... ,. .... ~ ......... .., -.

e. CUT ca.Ir •l'C.Cr ~ .._ ~~o~ ... ..,..,.. .......... ~...,... ........ ~

9'C&a °" ~- °"' ........ C.J/AJIO c........._•'-""""~o .. ......_. ... ~VITM~~.

&.IWLAT&.O M.C.TIOll OJ' CA&L.& TaAY H.&.Y M.. U~D N UC.U O' 1.TANIOAAO TRA"r COi/Ulli,

DAVIS-BESSE NUCLEAR POWER STATION RACEWAY CABLE SPREADING ROOM

FIRE BARRIER SECTIONS~\ <E-356R ~ Si\.lv

FIGURE 8.3-37 REVISION 0 JULY 1982

I co'' OR. MO~E'-

l~-~~~~C-H_A ___ ~U_E_L~B-(_A_)~~----,2~~

.se:.E. ~OTC. 3 \

-- - -- -- -- -- ___ \.___ -- - - --

CHA..~~E.L- a (1)

~OTE.S:

I. ALLTR.AYS .b....RE.. SOLIO BOTTOM.

a. F"IRE.. SARRIE.~S E:.XTE.t-JC , ..... ee:yo~c E.AC.H SIOE. Or C:F<OSStt-i.JGit F=Olt-.JT.

3. 9ARRIE..R f=)~OVIC>EC-SE:.~~TIOt-J C.R•TE..R•A F'OR ~E.CUt-..JCAfl-JT CLASS :C..E. TRAYS ~OT MET.

c;;."' OR MO~E..

4. BARRIE.~ ~ROVIOE:.C F'OR SE.f=)A.~ATIOt-J SE.T~E.E...IJ A(e) A.~O a(a) NOT E.SSE.."'T•AL.. A~O E..SSE.~IAL- 2..

I C.HAt-.Jt-..1e:1- 1 (a) I ______ --r-

--------1 I ,a--'.. 12~· ~ .. -j ---------------------------------

CHA......,""-JE.'- B (A)

CHA~~~L. A (B)

5=-=- ~c_:r:_~t__- - --·----------~~ .. 1

/ Cl-IA"-J....iE.1- 2 (I ) /

LE.C3E.tiJO :

OAVISBESSE NUCLEAR POWER STATION CRITERIA FOR INTERPOSING TP.A YS

FIRE HAZARD

FIGURE 8.3-38

REVISION 0 JULY 1982

A.A.C:E\..twlA.V CHA.~.._..E.L- SE:F=As::ii>ATIO~ N:.TIQN A£~'C(SE1.-E.CI Qt-..JE:) c::o ....... ~1c;.uF:eATte:::XtJ FeAC..E:.'--'A.,... OISTA>-.JCe:. ·o· !TRAY SMELT SE.lF•G- de,.•Gt-

' )( Y ( tklCt-tE: 5') CA:;:>VEJ=t MAT\... .. 8. 3-39 B. 3-39

I

I I f i :

i J

I J :i

xQ QY

~

. , _____ r

1 r

I a =

1 2 3 4

C! .. 3 .. A I 1'' OR 1....E..~~

1,3 .. 4 _J_ I, a..a. . t..a, s .. . .

•,.3,' I' sE.E. "-JoTE. • I, .:S., 4 Pf~, Ml,__,IMUM I, 2., 4 5£.fDA.RA. T'1t::HJ • .. a,, :e c•aTA~CE.)

~YMBOLS___

TME.t=ltMAL- UJSUL-ATl.._.Clt MATL. Ot=- Sl1-ICO"-'E. r='"QAN ,..._, SP..AC..E. BE..T~E..E.1'.J FtA.CE..W'A.Y-S xtt v

........ E..RMAL. l~SUL...ATl ....... C'.it MATt-,. OR .sn_u:: .. Ot..JE. ~ 1>--JSIOC F=llACE~AY.S X ~O/c:::>A Y

==·

4.

co.

7.

e .

s.

NOTES l

F"I~ e-"R-=;,te:..t==ts A~e:. ~OT RE.QUt~E:.O

Se:.T\,.y"E.e::..t-J T\JC> (2) RACE:.'-l"AVS CC>"-JT~t t-...J t "-JG CL.A..~S, :C.lii:. c:AB' ES OS:- ;HE. SAME.. C.t-tA1'.J._..E:.L A~O SE.-T"""'E..E.~ R>CE.~A.,,.-.5 ~rAt ~I~~ r--..J Ot....J - C.L-ASS:, J: E:. c::ASL....E.S.

2 Z."" lh.J AC.TIOU ~E.c;:>u1F;E..O ~0'-'1..JM'-..J •t-...JOIC:.ATES> A I

SA.~ s::c.a e:.. s=. '""ST A. "-"-e:..c:; AT A....._.....,... F='Ot ~ '"'i I r-....J Tt-t E:. SF=.AC.E.. eE.T"'-'E.E.t...J R.A.C:.E.. ~A..,.... 5 Xi, -r: A >JO '.Jt. V RE:. Sl=E.C:.T1 VE..L.. Y.

"""'HE~ THE. F=E:.FU=E.>.JCtC.\..J'-.AI=< 01sr~<:::E. r S lt-..J ~E•'"-'E.l=t A 1-iC.':FllilO~.._._ ~~ A t/E:.ATIC:.A\.... t='-A.~E..."' THE.. CISTAJitJC.E. 15 OIV'IC>E:O l~TO •TS t-IORtiii!.Oh..JTA..\.- A'-JC v£RT1C:.A\- CQMF=Ot...JEtit.JT.S. F'tRE.. 6ARR\El=lt.S ARE. t=Ds:a:::;)Vace:o ~E.'.a-..J A"-JA\...YSIS OF' BOT\'-i C::OMPO~e:".J'=­~~u•RE. A F'll'~E.. BARF=illE.t=t...

~HE..l=lE MU&.-Ttll=>L..E. R~E'WAY.S E:..XIST 11'...I Cu::>SE.. PROXJMITV -ro E:..AC...H OTHE..F=t., E.AC.H ~A..l~ C:OMBl..._,-ATtC>tJ JS A-JJAl...Yze:c

SH&:.:e:.:r MA"rE:..~IAL... tS MJ~IM 'M •/e 11-flC..tir AS6E..$:"':"c:::>.$-rREE.. MARIN ITE..

SS:.FD~ATICN fllll:f~W•~e::,."1&:~"'MiiD F'OR Tl-IE.. Et-.IC:.l....OS.£0 F=ilAC.S:.~V"- C:O""-ITA_,U .. ..J l~G sr=-~Fu=~s l~COt--.J. CAS\...E..S

(11="AE.F•X.E:.O av ·=~••, 14,,E!!!>,,2.4_.34).ARE. Tt-tE:. &A,....,r::.. AJS r::'"OR TME. ~UME.RlC.A.\- X,Y C:MAt-...lt-JE.1- C..c:>M&.

Tr:tiA"Y C.QVE.lllt ""-"ILL BE- A"-'Y Ct-...JE.. OR A,)...J'Y C.Ot-16 OF" THE. FOL...L~lt-...JC:.. :

A) SC'-IC M&:..TAL..1-IC:. TRA.V C:.OV"E.R B) 51-1&:.E.T MATERIA...t.... C) THERMAL.. lft..J5·U'-ATl...._.C::. BL....At-.JK.E..T

~ME.~E.. ~OtJ~C:.L...~S %£. ~YS IUTE..J=tl='O!SE.C E\ETW'E.E.ti..J t=tE.OLJ"-'~'--.1,- C:.L...ASS :CE. ~AYS.,, Tt-1E. SE.PARATIO~ F=c~UtRE.'"'1E..~S SS:.T'WE~ Of='E.t-J--rcs= r::t.E..Cu~OAJ-JT C::'-ASS ::C.E.. ll=:tA.VSD ~ .......... ~CT eE.. a...s:..ss -ra-tA..t-J A.a .. v1::.RT•c:.AL..1.....v At-...10 ua-r 1-10R1a. I

I Ml~IMUH SE.P~AA.TIC»-J CIST.A..~E.. .. = 0£..TE.FtMtWE..'O ev TE:!!>T A"-JC At.JJ/!ll..\.. "'T'&1$. IF' Le:.&S Tt-t~ Mlt...JIMUM1 SE..£. AC.TI cu-..; ;:;c&:(ltU 1. RE:.C C:.OL.Ur-n. .. l.

DAVIS-BESSE NUCLEAR POWER STATION RACEWAY SEPARATION CRITERIA

FIRE HAZARD FIGURE 8. 3-39

REVISION 9 JULY 1989

~A.C.E.~Y C.~ti.JE.LSC:.PAAAT•O~ ,IC.Taot-J REA:C'O (SE'-£c:T c:»J£) RA.C'.E:..'--'AV C:HAJJtJE.L SE.~f'AT'f.O,_. ~IOtJ R£q'O(SFI ECT ONllt) -.- ~F'ICitUAATIQlt.~~--~AV CUST~C:E .. c'· T. __ -,. •Mtwt.:"1 '!!SE~FiG lslEJ'w:;. '--Ot...JFl~URATIC>tJR~E"'-'A~ CIS&T~E.·o .. fliiifA'T ~-~:mil FIG slE~G.

0 , t

)( ()

0 y

x ,- .. _o ~·-lYf

1 x r

Ll .... -v~r ~

~ v I'

I )( I j

Q

1 y I'

X V (ttJCl-tES) ~R MATt-. 8.3-39 B.3-39 )(' y (t~C.t-tESJ COVE~ t-'IAT"L... B.3-39 8.3-39

I e :a 4

I a 3 4

i!., .3, 4 (s.E.E.. t-..JOTE. 9 1,5,4 RE.. MU~JtMUM I,, 2,, A SE .. POJlfATIC:::.l.J i Cl, 3 c:>ICJDTA..._,C:.IE.)

i!~ 3,4 I., 3., 4

• .. ~4 •1 •.a

.

-• z ii •

JX

I ><

1><

I

I I y I 2 41-.. --- ! a .. .s . .a. I, 3,A I, i!,A 1,a .. :s

v I - -o-· ~

I a 3 4

m .. c. A,C:. &,C::. A .. C:.

I 2t3.,4 2 1,,.3,4 .:a 1,e.,4 4 ia,..a

A 2,4 a I, 3 C:. I, C!,S,4

I ae.,a, 4 e. • .. 3'4 .?!» l,i!.,4 4 1,c;e

A 2!,4 e \. 3 c 1,&,3'A

l_ l_ i

<IC

I

><f!v 'Xd.V ><t.v x-.v xev )(-V xetv Xfjt. y

XI/. V ><¢V ><I~

'X x )(

)(

x x ')(

')(

x x

'2. i!. 2 i!

z ii "i! i! i! a i!

i! a i!. i!.

ii!. • .. '& 1!. i! z

ii i! 2

---DAVIS..SESSE NUCLEAR POWER STATION

RACEWAY SEPARATION CRITERIA FIRE HAZARD

FIGURE B.3-40 REVISION 9 JULY 1989

---

(

,.~ ..... ._,.... C:MA'J~E. L.. ss:..-.. ... .....,..0"-J ,IC.TIO~ FeE.Q'C(.:S£L.EC.T ~· f=IAJ:..E'. \JAV C:~9'.Jti..IE.L.. SE.l='Al=l,.._T' IOJl.J ~IOW AEQ'D{sE• ~ONE ~P'"'ICiiUAAT~ ~C£.'-'!A'/ C•TA)JCIE. • C,.. T'AAV 5-f £.£.T _A II' ~IGi

- - •F"tc.Ulllt.ATION ~ ...... _E.~V CtSTA."1c:£.. •o· ~"' .-.. -£.T ~ A - 'ICI. - -A MAT&....•£ FIG 1tfa... ')( v (lt-.JCMES) CCVEA ~TL.. '.-( v ( .... JC: I-IE.$) 8.3-39 8.3-39 ---- B.3-39 B.3-39.

I ~.3,4 ~,._ v • - -- ! i

I x I e 1,3.4 v ii - - 1 ... •,a _, v ii! I - - -~ . ..a r,a,: I v z - - -Q I e.c l v i! - -, t I ...,, I i! A., C:. v z - -3 a,c: v .. - -..... A, C:. v J!. - -

I .)( I

L I 2'3..• Lr - • '*" ./ a 1,3.,.4. - ii ./ ./ I x I 3\ l,a! .. A - • ,/ v'

L A Cl"4 l v i!! - - '00' ... J,Ba.3 - .. ./ ,/ & f,!!l v 1! - -c: f,a?,3,,4 v i!!. - -

I v I

( "':

I ""' I 1·ollt L.E..~ I B..314 - • ./ ~ l

I l!#.9,.4 i v z e I., S, 4 1>'1" - - Q - • ./ ./ . 2 1,3,4 v i!. 1, a,4 I

j - - I 3 i - • ./ ./ 3 1,2!.4 v z - - 0 4 1, a,a - • ..,, t/ Q ~ 1,a,.a """' &. - - y

p I v I l e, c:. _I_ v • - -I!. A .. C:. v z - -3 IB,C: v z - - IBJ 4 A .. C::. v 'Z - - j I e,~,4 _.-~l~&S - • ,/ ../

Ct - ,, 3,, 4 - • .I' / )( 3 1, a, .s.. - • ./ .,/

I 2,31.,4 ..c.. v ... - 4 •ta, a () - - u • ./ ,/ -2 J, S.4 v ii - -j • 3 1,1!.4 v iL - - v

4 I, 2,3 I v 1IE. - -0 \ u I v I I a,c. _I_ v z - -e A.C: v ... - -

3 e.c:. 'I" a - -.... A,C. v .. - -:

DAVIS-8ESSE NUCLEAR POWER STATION RACEWAY SIPARATION CTITIR&A

FIRE HAZAN> FIGURE B. 3-4' I

REVISION 9 ...vt...Y 1989

RAc:.£."-'.A. "-.' CM At-..Jt...JE. '- SSE.PA~ATIO.._., N:.T 1otu "Eac f51£1 ECT I ) ~FIGUFl,,-l~ r=t~C:.E. .. ~A.Y' C>t&T~E (tltJ.) TAAY SHE.Er l'ffr'f' wr- .f'e ~IC&

~ )C v Ca Oa .,..._ .. 'E.t:I MAT't... - ~- B.3-39 8.3-39

I ~ I I )( I I e,3,4 A.e,c '84' <.ICD• '(' Z, z.• - -~ J3

2 1.,3,4 A.,S.,C: 3 I., 2!.~ 4 ~e.c:. 4 1,a.~ ~e,,c:.

i y

r·1x I a,~4 A.,B,C:. ,z4· <.41!. .. v •••• - -a ... :9.14 "•c: 1w 1 3 I, 2.,4 A._B,C: 4 1,2,,5 A,,~C:. I ,.

0 { y J I :

(

er\ I -.~.4 ~e,c: ~ <.4C. .. v z.,a· - -2 I. 3, 4.1 A..,1!5, c:: 3 I, 2 4 A..e .. c::. 4 11 ~a .Ai...B,c:.

I

t 5:: J Qt

.'

DAVl&BESSE NUCLEAR POWER STATION RACEWAY SEPARATION CRITERIA

FIRE HAZARD FIGURE B. 3 .. 42

REVISION 9 ~y 1989

(

I r

&AlltPtt e:.Fllt

VE.llllTIC:..AL.. SE.PAA/!1111.TICt-J '-l!EJE.S THAt-J RID:il\..Jlflll!:.O auT Citllt~TEl=l Tt-t4'~ I"' (SEE FIGa. 8. 3-4 I &42 FOR SEPA.lltA TIOU C:.P=tl TEflltt A.)

I

El E:~TIQ"-1 :

f

PIO&tJT' ~l-llC.-E. AFl==tCF ktATE.. SE.PAJ=t.A:r10U C:R1TE.11t11ta.. ca M .. T.

EL.E.VA.Tla.J: A•~& L..E.L... fltUi-J

.SMEE.I MA.T"EFllAL.. £.)(TEJJC TO A l='Ott-JT ~MIC.PIE. ~OPR\Aai...TE. SE.~RA.TlO._._.

CflltllE...RIA 19' ME..T.

,-M~A.1.- 1)..JS.U\...A.TI~

MATll:Jlt&AJ....

DAVJS..BESSE NUCLEAR POWER STATION FIRE BARRIER DETAILS

FIGURE B.3-43 REVISION 9 JULY 1989

( (

1-CRIBO~TAL- .51it.M0.RATI~

L F'S. TKA.tJ "'IE.GIUlllllE.C SUT Clt-S: ATE.A TM~ I~ (SEE. FIQ. 8 . 3 - 4 0 & 4 2 FOll'll. .s&fDA.N~TCU CRITll.Jlt\A.~

s . ~· - < -

~

--~

"

··~ -

-COVEJlltS B:.)(TE.tJO TO A ID019'..rr ~MEJlllE. A..P9f=fl'OPAI --=-· .SE.fDAF=tATIC»tJ C.,_l ,-E.RlA IS ME.-r.

SME.E.T MATE-AIAL.. E.>C.TiE.J-..1 -IC A POI~ ~HE.lllliL A.fDf9AOPf=tl~ Sl!:PAAATIO~ C:tllla,TE.11111.Ai.. IS M&..,..

..______,I ~ ... I _ __.I

ca) I

l (I) I llJr ~1111111:.C ~Hlt.JIJ (t) IS

C:L....A.SS %&:. CR ~u-c• .__ :CE. At-JC(&) IS R~~~ C:L...AAS :Z:E..

'EL.IC.V~TIOIJ

THEJltMAL.. l~SUL.ATl~Gt

MA.Tl!JlllAL.

·-· ·~-- ·----:.-~. ·- -----~'

.. - - . {'""';· -~- .·

DAVIS-BESSE NUCLEAR POWER STATION FIRE BARRIER DETAILS

FIGURE 8 .. 3-44 REVISION 9 JULY 1989

VEJ=fTIC:.""'- Qpt H~I ac>tJT'AL. SIC~~TICt-..a 1• OR \-IC..S (SEE. FIO.. 8. 3-39, 40, 41, &42 FCR SE.~.._TIOtJ C:.flflT£11t1A.)

•- AIDPAQ)(.y~·

SME.lt.T MATE.RIAL- £.)('TE.t--105 TC A ~QI~ "1./ME.RE. APf:=tlliO,.~I A.TE. 5EPAJlllATI~ Ct:l1IE.RIA IS ME.T.

D Sl-llE.E.T MATE..l=ttA.L. 11tEc;u1R I~ 0"-JE. flllt 4C:£~--t' Ch.J'-V. L-OCA.TJC>~ QE.f=IE>JC~T QflJ .SA*CF

TMSC.RMAt.... ltJSUL..ATIUO. M ... TE.lltl~L-

D '~1

,...--------~·-~j . '-II-IE.AMAL. lflJSUL..ATl~ca.

'-J'OOL.. l~.S'T"A'-'-E.C TO A. ~OltJi- ~E.P:llE. A.PPFtOt=tPllPl.A:rE,. SILfD~flilA.TtOt...J CRtTE..R\A. lS MET. AE~·c. ft-.J OtJE. R.AC.E..WA: 09'i...U ... ¥ \N't-flE.ti-1 IDJ~SUL...A­Tt O~ A.SSUw=t.EC>. CTMICA-'--tl&E. Sc:>TM ,.AC.~& F'11. • .. rr:.c.

D f::;~.~-. . .. ~ .

&IL..1 c:.cu~.J E.

DAVl&BESSE NUCLEAR POWER STATION FIRE BARRIER DETAILS

FIGURE 8 . 3 - 4 5

REVISION 9 JULY 1989

•mvoc N[UT~AL

FROM MCC EI/A

DBCIP ~Bf ~~R..!_ ~~~G,!!. I

--·-·-·-·-,

I

!

- ·---·---· ·-·-·-·-·J

FROM OC MCC DI 101281 THIS SHI.

.-"---.

BATTERY CHARGER DBCIPN

Oltlli HPI PUMP I ·I DC LUBE OIL PUMP

•125 voe NEUTRAL

• SU BATTERY IP

DIOl

AFPI OISCH TO SCI

DC MCC D IPA I AREA 6. lLEV .603' ·O" I

FROM MCC EI ID DEVICE DESCRIP TION FUNCTION DSC I PN, DBC IP, OBC IN

A OC AMIUER. 4.5" SO. TYPE, IY. ACCY. SCALE 800-0·BOOA I NDICATION DEV ICE DESCRIPTION FUNCTION

DBCIPN ·-·-·---·.., Al DC AMMEfER BD0·0·800A INDI CATION A1 oc AMMETER D·800A IOIGllALI IAJOI) SEE REF. owe. ITA8LE II INDICAT ION

Al OC AMMETER O·SOOA I ANALOG I INOICATI ON

v VOLTMETER DISPLAY FOR GE TYPE 196 METER RELAY INDICATION V2 OC VOLTIUER 0·150V IVlOll SEE REF. DWG. llABLE 11 INDICATION

VI O·I mA AMMETER WITH SCALE READING 0·300V INDICATION 27-1 UNOERVOLTAl;E RELAY IXJIJI SE[ REF . owe. llABLE I I ALARM

21 ·2 UNDERVOLTAGE RELAY 10091 SE( REF. OWG. ITABLE I I ALARM

SHUNT I SOmV, BOOA IGJOll SEE REF. owe . I TABLE I I

SHUNT 1 rnonw. 800A 1Gl021 SH REF. OWG. <TABLE 11

A"f&fl CE TYPE 1% METER RELAY. ALARM SEE RELAY SETTING MANUAL VOL. I TAB JO, SH. 202 FOR SETPOINTS TABLE I

32 DIRECT IOffAL CURRENT RELAY, GO l"liER RELAY, TYPE 195. ALARM SEE RELAY SETTING MANUAL VOL. I TAB JO, SH. 202 FOR SETPOINTS

BATTERY REFERENCE VENDOR CHARGER ORA WING

l6C OVERCURRENTIGROUNO FAl.l.T DETECTION, GO MHER RELAY, TYP£ 195. ALARM SEE RELAY SETTING MANUAL VOL. I TAB 30, SH. 202 FOR SETPOINTS DBCIPN E-B550·00005· I

E-8550·00006·1 R RESISTOR·IRC. IOOK OHM, llJ WATT, MOLDED METAL FI LM DBCIP E-8550·00010·1

E-8550·00011·1 RI POTENTIOMETER, OHMITE DIV!DllllM, 25K OHM SET AT 20K OHM, 25 WAIT oacrn E-8550·00015· 1

E-B550·CDDl6·1 R2 RESISTOR, 15DKDHM

SH~T IOOmV, 800A

____________ J

DC MCC I rAREA 6, ELEV . 603' -0")

DI08

:_ 2-:;;.KCMIL 7

400A~

0101 •115 voe DISTRIBUTION PNL DIP

·a· NOT ·o· SOOA

400A

NO

0101

2 500 KCMIL

•115 voe DISTRIBUTION PNL 02P

+-+-0128

1~1/CNo.210 200A

•11s voe TO MCC DIPA I THI S SHI. I

IOOA BOA

::~.2 +---c~:n~, DI 11 I D5TE I EMER LIG XFER SWO< 3

·o· NOT ·a·

400A JOOA

INV YVA

FROM OISTRIBUTION ---~ PANEL YAR

FROM OC HCC DI IOI 451 THIS SHI.

.-"---.

NEUTRAL

DIJS AfPTI MN SIM IN ISO VLV

DC MCC DINA ! AREA 6, £LEV.6Dl' ·O'I

• INVERTER WITH INTEGRAL SUTIC TRANSFER SWITCH

YVA

TO OISTRIBUflDN PANEL YAU

RCP BACKUP OIL LIFT PMP 1-1

01 ll RCP BACKUP OIL LIFT PMP 2·2

'O' NOT "O'

·o· NOT ·a·

DI 15 MFPT I EICR BRG OIL PMP

·o· NOT ·o·

SODA

NDT "O" "Q"

1-3/C No . 2 AWG

01 18 T·C EMER BRC OIL Pfol'

·a· NOT ·o·

CORNER ~ r SHIPPING SPLIT TRANSi T ION SECTTON ·---------~~-~~~

SHIPPING 5PLIT ---1--1---.,..----~ ....... -~__...-..__.

>·~· KEY PLAN DC MCC I

:_ 2·:::AKCMIL7

400A~

0112 ·125 voe DISTRIBUTION Pill DIN

200A +-

2&1/CNo.110

~

2 500 KCMIL

400A

NO

0145 Dill · 125 voe

MCC DINA l lHISSHT. I

- 125 voe DISTRIBUTION PNL 02N

NOTES: I. DELETED

2. ALL THE POWER DISCONNECT SWITCHES IN OC MCCI ARE MOLDED CASE MCN·AUTOMAT IC BREAKERS . CONllNOUSLY RAllU AS SHOWN.

l. 'O'/NOT 'O' BOUNDARIES ONLY APPLY TO 500A FUSES ANO FUSES CONNECTED TO NEUTRAL BUS.

4. ADDITIONAL NOTES I EE D•G. E·5,SH. I. I . THI S ORAVING DEP ICTS THE RELOTIVE PHYSICAL LAYOJT Of THE MCC .

G. THE DISCONNECT DEVICE FOR THE TURBINE GENERATOR EMERGENCY BEARI NG OIL PUMP !01161 IS A MAGNETIC BR[AlER OIU WES llNGHOOSE TYP£ HKA RATED 215170 AMPS.

SYMBOLS: • REMOTE EQUIPMENT NOT TD BE FURNISHED •S PART OF

THE MCC CONTRACT.

FROM MCC EI 2A

OBCIN ·-·-·-·-·,

! I _________ j

NEUTRAL

• STA BATTERY IN

DAVIS-BESSE NUCLEAR POWER STATION I 25/250V DC MCC No. I (ESSEN TI All

ONE LINE DIAGRAM E-6SH. 3

FIGURE 8.3-46

REVISION 31 OCTOBER 20lt>

DB 03-17-16 DFN=I:/ELEC/EGSH3.0GN

._

FROM MCC FI 2A FROM MCC F 11 0

• BA ITERY CHrnCER DBC:?P I BATTERY C'ARCER OBC2PN -·---·-·-- ----·---·-, -·-·-·-·-· -- ·-·-·-·-, I

H~i H~ '-''-"' ~

Uu rv "" ........

•Ir •• - -- -V2 - - 27-1 vz ....... ....... 27-1

0---- ] SHUNT I @---1 SHUNll

~I . I ] SHUNT2

• 13 - Al SHUNT2 I ....... I C;:::J l

}- :1 KIRK KEY - 1 INTERLOOI

T

--·-·-·-·-· ~---- · -· - ·-·-·-·- - --·-·-·-·- ·

-

+125 voe NEUIRAL

~

~ c 2

i;1 BOOA BOOA BO DA B~ 400A ..... , ..... , ._.....__I ,._,__ f;l i -- 1 -~ --u:Jj

NO ~ .__ --u...u ---- 0203 0205 0101 1000A BA TT ERY CHARGER BATTERY CHARGER •115 voe

D8C1P 08C2PN DISTRIBUTION PKL DIP

2 • 12 AWG

,._ko:._~1 lfl

~

~

----_.__ _._ -------_.__ ---e >U BA TTERY 2P

k~ MP 19B-1

0206 HPI PUMP 1-2 DC LUBE 0 IL PUW'

DEVICE DESCRIPTION FUNCTION DBCZPN DBC2P OBC2N

A DC AMMHER, 4.5 ' SO. TYPE, fl ACCY . SCALE BDD-0-SOOA INDICATION DEV ICE DESCRI PTION FUNCTI ON

Al DC AMMETER B00-0 -BOOA IHOICATI Oll A2 oc AtoM:T ER 0-BOOA IOI GI TALI IAJOl l SEE REF. owe. !TABLE ll IND ICATION

A3 DC AWHER 0-800A IANALIJGI I NOlCATI Oll

v VOL !METER DI SPLAY FOR GE IYPE 1% METER RELAY IHOICATION V2 DC VOL TMETER 0-150V I VJOl l SEE REF. OWG. !TABLE ll IND ICATION

VI 0-1 •A Al+IETER WITH SCALE READING 0-300V I NDICATION 17-1 UNOERVOLTAGE REL AY I X3131 SEE REF . owe. !TABLE ll ALA RM

27-2 UNDERVOLTAGE RELAY IX3091 SEE REF. DWG. IHBLE ll ALARM

SHUNT I 50rnV , 800A I GJOI I SEE RH. DWG. I TABLE I l

SHUNT 2 IOOrnV, BOOA IGJ021 SEE REF. owe. !TABLE ll

~ GE lYPE 1% MEIER RELAY . ALARM Al<BI I SEE RELAY SETllNG ~ANUAL VOL. I lAB JD, SH. 202 FOR SElPOJNlS TABLE I l1 DIRECTIONAL CURREN! RELAY , CE MEIER RELAY, lfPE 195. ALARM BATTERY REFERENCE VENDOR

5E[ REL AY SETTING MANUAL VOL . I TAB 30, SH. 202 FOR SETPOI Nl S CHARGER DRAWING l6C OVERCURllENT/GlllllID FALU DETECT ION , GE MEIER RELAY, l YPE 195. ALARM DBC2PN E-8550-00020-1

5EE RE LAY SETTING MANUAL VOL . I TAB JO, SH. 202 FOR SETPOINlS E-8550-00021-1 R R£SISTOR·IRC, IOIJ< OHM, lfl WATT, MIX.OED METAL f lLM DBC2P E-8550-00025-f

E-8550 -00026-l RI POTENTIOl£TER. MlllE OIVIDOHM. 25K OHM SE! I.I ZOii OHM, 15 WAH DBC1N E-8550-00030-l

E- B550-000J l -1 H1 RESISTOR , 150K OHM

SHUNT IOOmV, BODA

DC MCC 2 (AREA 6, ELEV. 603' -o" l

·o· NOT ·o· 500~ - I

I SOOA

·a· NO! ·a· 1-J/( N~- JA

IOOA B~ No. 6 AWC PBP50

IOOA GOA 2 I - NOT~. ' Q' ' O' V 715 .._ kt-~ ...... ,__ k~ T--iCn-1 10

~ ., ...... ,__ f-<~ l -No.; k~ MP0712 - ~10V v 211s ~c

f-<t- AWG k~ - " CONlROL 041[1 IOA - "DV

0111 02 14 AC EMER LIG ·o· NOT '0 ' JA fil... RCP BACKUP XFER SWCH 2 OIL LIF l - -; @ PMP 1-1

~ ·a· NOT ·a· i;1 T . IOOA B~ J~ 400A IOOA IOA I 400A

k~ '1---iiH lti -1--.-.-- -kt-~ ......... R RI ........... I-<~ 3-No. : K~~MPJ72C .....!!£ .... ,__ 76C

k~ AWC f-<~ -=i CONTR<l. ...H.... 0202 +125 voe 0212 049E I DI STR IBUTION EME R LTC PNL 021' XFER SllCH 4

400A JOOA -_,_ -1 '

........... - - ' -0216 INV YV8

FROM DISTR IBU TION ----~ PANEL Y8R

e INVERTER WITH INTEGRAL STATI C TRANSFE R SWITCH

YVB

fO OISTRI BUT ION PANEL YBU

.... 1 0~ 0211 ·o· NOT ·o·

RC MU Piii' 2 AU X Oil PMP

1-JtC No.6 AWG 1- J/C

PBF50

IOOA 60A 2 I I DOA SOA 2 k~ T--iCn-1 10 ... ..... N~ k~ ).....{DH l~ ... .....

k~~MP072J k~~ MP0282 f-<~ --=i CON IROL .,.. f-<~ -=-i CONTROL

021i 10~ 0215 10~ RCP BAC~UP MFPl 2 ·o· NOT ·o· OIL LIFT ·o· NOT ·a· ENER BRC PMP 2-1 OIL PM!'

NOT£S : l. DELETED

2. All !HE POWER OISCONHECT SWl l CHES IN DC MCC1 ARE MOLDED CASE NON-AUlOMAllC BREAKERS, CONllNOUSL Y RAIED AS SHOWN.

J. ADDITIONAL NOTES SEE OWG. E-5 , SH. I.

4. 'O ' /NQT "O' BOUNDARIES ONLY APPLY 10 500A FUSES. AND FUSES CONNECTED TO NEUTRAL BUS.

.. , ~ .. :1 SEE NOTE 8

OWG E5,S/1.l l IOOA 6DA 2 I-<~~ 10

H~ ~ MP02l0 Ht- -=-o CONTROL

02l8 IOfu 1-G HZ ·o· NOT ·a· cMER SEAL Oil PNP

5. THIS DRAWING DEPICTS lHE RELATIVE PHYSICAL LAYOUT Of THE ICC.

SYMBOLS: * REMOTE EOUIPMENl NOT TO BE FURNISHED AS PARI OF

THE MCC CONTRACT.

0132 -125 voe ......,__, .J_ 120V 0 ISTRIBUT ION -:- AC PNL DIN

i;1 400A _,__

-0133 -125 voe OISTRIBUTION PNL 02N

r SHIPPING SPLITS l I I I I I

KEY PLAN DC MCC 2

f

BODA BODA ._...__~

NO -0221 BATTERY CHARGER DBC2PN

FROM MCC F I 2A ... •_B~~~R_::. ~~~~R- OOCZN --·-------,

H~ ~~

·Ir

V2 - -- - 27-1

0---- ] SHUNll

1

] SHUNT2 Al -I 1 i i I I I

--·-·-·-·-· ~ - - · -·- · - · j

NEUTRAL

- 121 voe

~

~ c

T

BODA BODA - ' ,._ ,__ 1-u...ir--

~[l_ ___ l' ,__ 0234 BATTERY CHARGER

600A

2SOOA DBC2N

_J. -1 STA BATTERY 2N

DAVIS-BESSE NUCLEAR PO WER STATION l25/250V DC MCC No . 2 (ESSENTIALl

ONE LINE DIAGRAM E-6 SH. 4

FI GURE 8.3-47

REVISION 31 OCTOBER 201 5

DB 03 - 17-16 DfN= [: /[LEC/E6SH4 .DGN

PLUED EXISTING ICC EIZC

ICC EIZC EXTENSION ICM. I I

DWG.£·&, SH.1 100A TOA t-'-D---

IEl210 TO NCC El20

JOA 2SA IL~ +-'-0---i~

1£1212 SER'::~' PUtP VENT FAN 1

J~~ 1.~ +- -....----.~

BEi 205 IC!l902 SERY.WTR PIN'

VENT FAN 2

I INTAKE STRUCTURE.EL 57&• FIRE PUW ROOlll

150/JO IL +-~---I i____/jO\

BF'12tt ~ SEAV WTR POW

VENT FAN :S

1501301~ f-~---I r--'1!J

BFl2J5 llCHCM SERY lfTA PUMP

Yl:NT FAN 4

I INTAKE STRUCTURE,EL.576' SERV WTR PU• ROOM t

6·"2 AWG F-ICC EUC EXTENSION

<SEE NOTE 21

NCC £120 fCM•IJ _.,.__,.,__ ___ _ NOTE S

"Cl" NOT"G" JOA IA I~ -r- ,..._

+-'--ii----1~

J•SOO kCtll L FROM 410¥ BUS El

DWG.E •4, SH. I ICC Et&A fCH. I I

8Et2tM MFU401 BACK IP SEAV WTR PU .. STRAINER

1SOl15 tR

NOTE J "Cl" NOT"G"

+-~l---+-0 Bt:t20J ICOIOO

+-~o;-1 f--sPARE

4001250 ._,...:..._ ___ _ IEl&Ot TO ICC E1'8

TRAVELING SCREEN AllU EXHAUST FAN 150/H IR +-"'--1 f--SPARE

8Etl06

150140 ._,...:__ ___ _ NOT£ J

"Cl" NOT"G" J0Au1~ +- '--ii----1 . J

IE1206 -·90

BACK Ill' SERY WTR STRAINER DISCHARGE YLY

NCC SPACt NEATER CONTROL

1 INTAkE STRUCTURE.EL STI' FIRE PIN' ROOlll

J•SOO lClllL F-4- BUS Ft OlfG, E•4, SH.2

MCC FHA fCH.21

... ~---I .7 1!0'115 IR~ lf'1616 BYPASS YL Y IN THE llUJ2 NINIFLOW LINE

150115 tR ._,...---I 1--G!

BFl617 . llYJ)'{IO RC -EIP PIN' SUCTION VAL YE

4001250 ... ~'-----BFl620 TO MCC F118

150140 ._,...;__ ___ _ BFIU4

150115 1L

CONSTANT YCL TAGE TRANS· FORNER XY2

._,... ----11--- SPARE 8F'1111

UREA 6, EL• &01•, All 4211

8£1616

150140 +-~:..._ ___ _

8£1117 CONST ANT VOLT AGE TRANSFOIUl!R XYS

UREA 6, EL 62:S0 RM SU J

150/IS USJ021 +-~---'--+-BFIU2 SU.VENT. 1so11s :C~s=• +-~----- sPAAE BFIUJ

150140 ... ~;..._ ___ _ BFtUS

190115 IXUOI I +-~:...__...._....,. __ •... , STA.VENT.

150115 ~sft"u +-~;.._ ____ sPARE

11£1612

NOT£ J "Cl" NOT"Q•

1501100 ~, +-~;.._ __ __._, TO 8SW220X

IEl61S SEE owo. NO. E·llJ,SH.2

NCC £1111 fCH.t I

400 +-~;..._ ___ ..,

8El60I F- ICC EllA

UO/l5 IR IPIP2111 +-"'--!~

IEl602 • .:V..CYo RC PR2R PWR

RLF SHUTOFF YLY

150115 101021 +-~--~--

8El61J m!"~~"llf.~~iA 110115 ._,... __ ...,.. ___ SPARE

8E<at•

lllCC FtU ICH.2J

•oo f-~'-----

BFl&OI FROM llCC F16A

1501100 JL ._,...---I f-- SPARE BFt602

150/30 1L f-~ --j f-- SPARE

BFllO&

150/30 1L +-~ ----1 f--- SPARE IF'1107

UREA I, EL. HJ•, RM SOOI

150/JO ~ ~'----- SPARE

IF1603

150130 tL +-~ ----1 f--- SPAR£ BFl608

ISO/IS +-~'---'--"" SPARE

BFllOI I 750115 I XJ703 I f-~

SF'ta10 cnn. ATMOSPHERE RAO.-. RE4597BA

rmua.. '. FOR GENERAL NOT£$ AND REFERE- owes.

SEE £•5,SH.t 2. A U•HIGH PULL BOX FQA THE

INCOMING LINE IS LOCATED ON TOP OF ICC E120 ISEE YE- owe. 12501 ·E·IO·IOI

~-o

D

DAVIS-BESSE NUCLEAR POWER STATION 480V AC MCC (ESSENTIAL)

ONE LINE DIAGRAM E-6 SH. 5

FIGURE 8.3-48

REVISION 30 OCTOBER 2014

II 01-15·14 llFN•lllELECIE&SllS.11111