Transcript of Circle Thane - M&E OFFICER District Raigad - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH Bhiwandi
1.Review Taken About Less
Expenditure
2.Taken Review adout MR
3.3.Delivery Perfomance is
Satisfactory.
Mrs.Neha Abitkar (CPM)
Date 5.12.2018Instruction given to MS MS Level yes No
SDH Jawhar,PHC
Sakashet
1.Review Taken About
Less Expenditure 2.Taken
Review about Sam & Mam
Children
3.Taken Review of RKS EC
& GB Meeting
Mrs.Neha Abitkar (CPM)
Date 14.12.2018Instruction given to MS MS Level yes No
Dho Thane
1.Review taken about
annual Infrastructure report
2.Correction In Report of
Hmis.
3.Taken Review about Rch
Portal Data Entry
Mrs.Heena
Chavan(CM&E)
Date:11.12.2018
Instruction given to
District M&E & MIS
Staff
DHO LEVEL yes No
SDH Dahanu
1.attend Epilipsy Camp
2.Taken Review adout MR
3.Taken Review about Sam
& Mam Children
Mrs.Heena
Chavan(CM&E)
Date:22.12.2018
Instruction given to MS MS Level yes No
SDH Pen
1-Periodic Paste control &
antitermile treatment was
not done 2- Seprate Two
wheeler and Four wheeler
parking were not seen 3-
Infection control committee
was not established
District Programme
Manager, Raigad Dr. Nilesh
Kokare ,11-01-2018
1- Disscused with Staff
about periodic ntitermile
treatment & Paste
control 2- Disscused with
Staff about eprate Two
wheeler and Four
wheeler parking 3 -
Disscused with MO
about establishment of
Infection control
committee & periotical
meetings of it with
minutes writings
SDH level No SDH level
Circle Thane - CPM
Circle Thane - M&E OFFICER
District Raigad - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
KolhapurAudit Complience
Submitting
District Accounts
Manager, Raigad Mr.
Santosh Patil ,3 &
4/12/2018
Mangaon & Mahad
Audit Para Complience
18/12/2018Audit Para Compliance
should be submitteTho level No THO Level
SDH Pen
RKS Record Cheking &
Sickle cell programme
rewive
Mrs. Priti Patil ,21-12-2018 Instructed about Staff SDH level NO SDH level
Pen Instructed HMIS & DHIS
Report correction
M&E Officer, Raigad Mrs.
Jayshri Mokal ,29-12-2018
Instructed HMIS &
DHIS Report correction Tho level No PHC level
SDH Dahanu SDH VisitDr. Kanchan N. Wanere,
CS Palghar, 03/12/2018 SDH Visit At Facility Yes No
RH Vikramgad, SDH
KasaRH, SDH Visit
Dr. Kanchan N. Wanere,
CS Palghar, 10/12/2018RH, SDH Visit At Facility Yes No
RH Virar, RH Manor RH VisitDr. Kanchan N. Wanere,
CS Palghar, 21/12/2018RH Visit At Facility Yes No
RH Wangaon, RH Boisar RH VisitDr. Kanchan N. Wanere,
CS Palghar, 22/12/2018RH Visit At Facility Yes No
SDH Jawhar, RH
MokhadaSDH, RH Visit
Dr. Kanchan N. Wanere,
CS Palghar, 27/12/2018SDH, RH Visit At Facility Yes No
RH Talasari RH VisitDr. Kanchan N. Wanere,
CS Palghar, 29/12/2018RH Visit At Facility Yes No
PHC Gorha, PHC Kurze,
SC KhutalPHC,SC Visit
Dr. Dayanand Suryavanshi,
DHO, Palghar, 05/12/2018PHC,SC Visit At Facility Yes No
PHC Bhatane, SC Haloli,
SC DekalePHC,SC Visit
Dr. Dayanand Suryavanshi,
DHO, Palghar, 07/12/2018PHC,SC Visit At Facility Yes No
PHC Jamsar, SC Bhopoli, PHC,SC VisitDr. Dayanand Suryavanshi,
DHO, Palghar, 11/12/2018PHC,SC Visit At Facility Yes No
PHC Jamsar, PHC
Sakharshet, SC DabosaPHC,SC Visit
Dr. Dayanand Suryavanshi,
DHO, Palghar, 12/12/2018PHC,SC Visit At Facility Yes No
PHC Talwada, PHC
Malwada, SDH KasaPHC, SDH Visit
Dr. Dayanand Suryavanshi,
DHO, Palghar, 18/12/2018PHC, SDH Visit At Facility Yes No
THO Dahanu, PHC
Chandranagar, PHC
Aina, PHC Chinchani
PHC,THO VisitDr. Dayanand Suryavanshi,
DHO, Palghar, 27/12/2018PHC,THO Visit At Facility Yes No
PHC Jamsar, PHC
Sakharshet, PHC TalwadaPHC, Visit
Dr. Dayanand Suryavanshi,
DHO, Palghar, 28/12/2018PHC, Visit At Facility Yes No
District Raigad -
District Raigad - M&E OFFICER
District Palghar - CS
District Palghar - DHO
District Raigad - DAM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Viramgad, PHC
MalwadaTHO, PHC Visit
Dr. Milind Chavan,
DRCHO, Palghar,
03/12/2018
THO, PHC Visit At Facility Yes No
PHC Ashagad, PHC
Ganjad, SC JamshetPHC, SC Visit
Dr. Milind Chavan,
DRCHO, Palghar,
11/12/2018
PHC, SC Visit At Facility Yes No
PHC Sakharshet, PHC
SakurPHC Visit
Dr. Milind Chavan,
DRCHO, Palghar,
18/12/2018
PHC Visit At Facility Yes No
PHC Durvesh, PHC
Somta, SC Nanndgaon 2PHC, SC Visit
Dr. Milind Chavan,
DRCHO, Palghar,
026/12/2018
PHC, SC Visit At Facility Yes No
PHC Sutrakar, PHC Wasa PHC Visit
Dr. Milind Chavan,
DRCHO, Palghar,
31/12/2018
PHC Visit At Facility Yes No
RH Viramgad, RH Wada RH VisitDr. R. S. Kelkar, ACS
Palghar, 06/12/2018RH Visit At Facility Yes No
SDH Kasa SDH VisitDr. R. S. Kelkar, ACS
Palghar, 14/12/2018SDH Visit At Facility Yes No
RH Manor, RH Boisar RH VisitDr. R. S. Kelkar, ACS
Palghar, 24/12/2018RH Visit At Facility Yes No
RH Virar RH VisitDr. R. S. Kelkar, ACS
Palghar, 27/12/2018RH Visit At Facility Yes No
RH Mokhada, SDH
JawharRH, SDH Visit
Dr. R. S. Kelkar, ACS
Palghar, 31/12/2018RH, SDH Visit At Facility Yes No
SDH Jawhar Kayakalp Peer assesment
Abhijit Debadvar DPM
,Palghar
14/12/2018
Gap finding done as
per Kayakalp norms by
assessor
Facility Level Yes No
SDH Kasa Visit
Abhijit Debadvar DPM
,Palghar
20/12/2018
Report checked and
varified, line list checkedFacility Level Yes No
SDH Kasa Visit
Abhijit Debadvar DPM
,Palghar
31/12/2018
Report checked and
varified, line list checkedFacility Level Yes No
THO Wada MPW Check listRajendra V Butte M&E,
Palghar 28/12/2018Visit Facility Level Yes No
THO Jawhar MPW Check listChirag S Bari SI, Palghar
28/12/2018Visit Facility Level Yes No
MPW Check list
Kramisha D Gaikwad,
IDSP Co-
ordinator,Palghar,28/12/20
18
Visit Facility Level Yes No
Phc tarapur, School mr supervisionSapana Pawar DCM,
Palghar 04/12/2018Visit Facility Level yes Yes
District Palghar - DPM
District Palghar - M&E OFFICER
District Palghar - SI
District Palghar - IDSP Co.
District Palghar - DCM
District Palghar - DRCHO
District Palghar - ACS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
District Training Cente vhnsc Training Sapana Pawar DCM,
Palghar 14/12/2018Visit Facility Level yes Yes
Vasai Virar Cororation Asha YojnaSapana Pawar DCM,
Palghar 15/12/2018Visit Facility Level yes Yes
District Training Cente PME TrainingSapana Pawar DCM,
Palghar 18/12/2018Visit Facility Level yes Yes
District Training Cente PME TrainingSapana Pawar DCM,
Palghar 20/12/2018Visit Facility Level yes Yes
District Training Cente PME TrainingSapana Pawar DCM,
Palghar 18/12/2018Visit Facility Level yes Yes
District Training Cente Asha Software TrainingSapana Pawar DCM,
Palghar 27/12/2018Visit Facility Level yes Yes
District Training Cente Asha Software TrainingSapana Pawar DCM,
Palghar 28/12/2018Visit Facility Level yes Yes
Palghar Durvesh phc
Arati R.Patil.rks/sickle cell
co-ordinator palghar Date-
01/12/2018
RH PALGHAR-1)Cash
book should be signed by
authorised person2)
voucher not signed by
authorised person .( Dr.
Manghnale)Muster not
available PHC
DURVESH-MR Vaccine
camp
At Facility YES No
jawhar SDH Jawhar
Arati R.Patil.rks/sickle cell
co-ordinator palghar
Date14/12/2018
1)Only one meeting held
for both Governing &
Executive 2)sickle cell
monthly meeting
At Facility YES No
vikramgad BTT Vikramgad
Arati R.Patil.rks/sickle cell
co-ordinator palghar Date-
15/12/2028
vishwas Abhiyan trening At Facility YES No
Palghar DDT PALGHAR
Arati R.Patil.rks/sickle cell
co-ordinator palghar Date-
17/12/2018
vishwas Abhiyan trening At Facility YES No
Dahanu SDH DAHANU
Arati R.Patil.rks/sickle cell
co-ordinator palghar Date-
28/12/2018
sickle cell monthly
meeting At Facility YES No
Jawhar VISIT TO SDH JawharSachin Dagale JE, Dho
Office Palghar 01/12/2018SITE VISIT With E.E sir & D.E sir Site Visit YES No
District Palghar - Jr.Engineer
District Palghar - RKS & Sickle Cell Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Talasari VISIT TO PHC UdhavaSachin Dagale JE, Dho
Office Palghar 08/12/2018SITE VISIT For Ground beam checking YES No
Palghar VISIT TO PHC EdvanSachin Dagale JE, Dho
Office Palghar 12/12/2018SITE VISIT
For PHC main building water
proofing workYES No
Talasari VISIT TO PHC UdhavaSachin Dagale JE, Dho
Office Palghar 18/12/2018SITE VISIT For Ground beam concreting YES No
Mokhada VISIT TO MokhadaSachin Dagale JE, Dho
Office Palghar 24/12/2018SITE VISIT For HWC survey YES No
Mokhada VISIT TO MokhadaSachin Dagale JE, Dho
Office Palghar 25/12/2018SITE VISIT For HWC survey YES No
Jawhar VISIT TO JawharSachin Dagale JE, Dho
Office Palghar 26/12/2018SITE VISIT For HWC survey YES No
Talasari VISIT TO TalasariSachin Dagale JE, Dho
Office Palghar 27/12/2018SITE VISIT For HWC survey YES No
Dahanu VISIT TO SDH JawharKaran Mokashi. JE,DHO
office palghar 01/12/2018SITE VISIT Site visit with E.E.& D.E.sir YES No
VikramgadhVISIT TO SC Shil
Bhopoli,chinchghar
Karan Mokashi. JE,DHO
office palghar 05/12/2018SITE VISIT
Site visit At SC Shil, Bhopoli,
Chinchghar for HWC workYES No
VikramgadhVISIT TO SC Moho
Bhopoli,medhi, Chinchghar
Karan Mokashi. JE,DHO
office palghar 15/12/2018SITE VISIT
Site visit At SC Shil, medhi,
Chinchghar,moho for HWC workYES No
VikramgadhVISIT TO PHC
Kurze,malwada,talwada
Karan Mokashi. JE,DHO
office palghar 18/12/2018SITE VISIT HWC survey with E.E. sir & D.E.sir YES No
DahanuVISIT TO PHC Aina &
Ashagadh with SC
Karan Mokashi. JE,DHO
office palghar 24/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
DahanuVISIT TO PHC Ganjad &
tawa with SC
Karan Mokashi. JE,DHO
office palghar 25/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
DahanuVISIT TO PHC Saiwan
with iternal SC
Karan Mokashi. JE,DHO
office palghar 26/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
Palghar VISIT TO PHC EdvanKaran Mokashi. JE,DHO
office palghar 27/12/2018SITE VISIT Second MO slab casting YES No
District Palghar - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Vikramgadh
VISIT TO PHC
malwada,talwada with
internal sub center
Sham savar. JE,DHO office
palghar 24/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
VikramgadhVISIT TO PHC kurze with
internal sub center
Sham savar. JE,DHO office
palghar 25/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
JawharVISIT TO PHC Jamsar with
internal sub center
Sham savar. JE,DHO office
palghar 26/12/2018SITE VISIT For HWC Survey with D.E.sir YES No
Palghar VISIT TO PHC EdvanSham savar. JE,DHO office
palghar 27/12/2018SITE VISIT Second MO slab casting YES No
PHC Rui Chatrapati
Block Parner
Dist Nagar
1.HMIS data is qualitatively
good
2. Delivery are good but
most of ANC are not ready
to stay there for 48 hrs
3. Conduct the validation
commity meeting for
improving the qulity of hmis
data
S.S.Gawande (Nashik
Circle M & E )
Date:-06/12/2018
look after RCH Portal
data Registration.
Encourage ANC to stay
for 48 hrs
Facility by M.O.,ANM,MPW yes
SC Hanga
1. PHC give workplan to
SC & Sc take follow up
according to workplan.
2. In DHIS facilitys enter
the data by timely but ANM
is confused between IUD &
PPIUCD
3. Conduct the validation
commity meeting at sc and
phc level for improving the
qulity of hmis data
S.S. Gawande (Nashik
Circle M & E )
Date:-06/12/2018
Update the services in
RCH portal using real
time data entry. In DHIS
Check the validation
error at facility level and
correct it by timely.Also
told difference between
IUD & PPIUCD
Facility by ANM,MPW yes
RH Parner
1.JSSK board is not in front
lobby
2.employee got confused for
102,104,108
3.Include data for Private &
public e.g. live
birth,delivery in public
S.S.Gawande(Nashik Circle
M & E )
Date:-06/12/2018
give the Instuction to
anm,Mpw about private
& public facility
work,Jssk &
102,104,108
Facility by MS,Staff nurse yes
1. PHC Pimpalgaon
Tl. Bhusawal
Dist. Jalgaon
1. Surrounding was not
clean and maintened
2. RKS Meeting was not
conducted
3. RCH Portal workplan is
given to all sc.
Shri. Sandeep Gawande
CMEO, Nashik
Date:- 15/12/2018
1. Ask them to place and
maintain the Timetable
in Display area.
2. IEC Material of JSSK,
I04, and other asked to
display
3. Asked the ANM to
update the AMG & UF
Record.
Facility Level MO ANM Yes
District Palghar - Jr.Engineer
Circle Nashik - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
2. SC Talwel
Tl. Bhusawal
Dist. Jalgaon
1. Validation error
committee are conducted
but no record maitain.
2. AMG & UF record was
not updated
3. Field visit of the SC
record not available
Shri. Sandeep Gawande
CMEO,Nashik
Date:-15/12/2018
1. Instruct them to keep
record for error
committee meeting.
2. Asked them to update
the record of AMG & UF
3. Asked them to update
the Field visit Register
Facility ANM , MPW Yes
3. SC Vazarkheda
Tal. Bhusawal
Dist. Jalgaon
1. ANM is confuse betn
104,108,102
2. Cash Book was not
updated
3. Timetable of
Immunisation was not
displayed in the open area.
Shri.Sandeep Gawande
CMEO,Nashik
Date:-15/12/2018
1. Asked them to display
the time table in open
area & display what is
102,104,108
2. Ask them to maintain
the cashbook
Faclity ANM , MPW YES
1.RH Akkalkuwa
Dist. Nandurbar
Medical & Dental Camp.
Total Patient - 570
IPD -17
Surgery - 19
Shri. Ranjeet Chindhu
Pawar
CPM, Nashik Circle,
Nashik
Date:-03-12-2018
Asked the concerned to
display the updated IEC ____ ____ ____
2. RH Kotul,
Dist.Ahmadnagar
1. Planning of the Medical
& Dental camp
Shri. Ranjeet Chindhu
Pawar
CPM, Nashik Circle,
Nashik
Date:-12-12-2018
1. Asked the concerned
to display 108/102/104 in
frontal area.
2. Internal Cleanlines to
be Maintained on regular
3.Asked the concerned
for outside cleanliness.
4. Giving information
about Medical & Dental
camp Guidline
District & Block Yes ____
Surgana
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
06/12/2018
Discussion with MS,
MO,AS, SN, Yes
Yeola, Niphad
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
8/12/2018
Discussion with MS,
MO,AS, SN, Yes
Malegaon, Chandwad
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
9/12/2018
Discussion with MS,
MO,AS, SN, Yes
Circle Nashik - CPM
District Nashik - CS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Malegaon
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
10/12/2018
Discussion with MS,
MO,AS, SN, Yes
Malegaon, Dabhadi
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
12/12/2018
Discussion with MS,
MO,AS, SN, Yes
Ghoti, Igatpuri
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
22/12/2018
Discussion with MS, ,
MO, SN, AS Yes
Harsul
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
23/12/2018
Discussion with MS, ,
MO, SN, AS Yes
Ghoti, Igatpuri
M.R. Reviwe, NHM
Reviwe, NHM Expenditure
Review. Mistakes in HMIS
Data, JSSK Pickup, Drop
Back Review. NCD
Program Review, RBSK
Program, HR
Review,Hospital Services
Reviwe
Dr.S.P. Jagdale, CS,
28/12/2018
Discussion with MS, ,
MO, SN, AS Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Igatpuri, Ghoti
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
04/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Malegaon
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
05/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Niphad. Lasalgaon
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
07/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Igatpuri, Ghoti
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
11/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
District Nashik - RMO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Igatpuri, Ghoti
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
15/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Satana
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
17/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Trimbak
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
20/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Nandgaon Manmad
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
22/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Yeola
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
24/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Bhagur, Deolali Cmap
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
26/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Igatpuri, Ghoti
Measle Rubela Program
Visit , Finding for F.P.
Cases, NHM Reviwe,
NHM Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Hospital Services Reviwe,
RH Nagarsul Inquery
Routine Immunization
Dr.A.B. Pawar, RMO (or)
28/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Chandwad, Umrane
Measle Rubela Program ,
Finding for F.P. Cases,
NHM Reviwe, NHM
Expenditure Review.
Mistakes in HMIS Data,
JSSK Pickup, Drop Back
Review. NCD Program
Review, HR Review,
Routine Immunization
review, Hospital Services
Reviwe Routine
Immunization
Dr.A.B. Pawar, RMO (or)
29/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
UmraneRural Hospital inauguration
Prepration
Dr.A.B. Pawar, RMO (or)
30/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Umrane Rural Hospital inaugurationDr.A.B. Pawar, RMO (or)
31/12/2018
Discussion with MS,
MO, A.S, Incharg sister, Facility Yes
Deolali, Bytco Hospital MR VisitDr.Ravindra Chaudhari,
DRCHO, 1/12/2018
Discussion with TMO
& MO
Talegaon Dindori,
Varkheda, Kadva
Karkhana, Nigdol, Umrale
MR VisitDr.Ravindra Chaudhari,
DRCHO, 5/12/2018
Discussion with TMO
& MO
Adgaon, Chandwad,
Saundane, Malegaon,
Vadner
MR VisitDr.Ravindra Chaudhari,
DRCHO, 10/12/2018
Discussion with TMO
& MO
PHC Bolthan, PHC
PimparkhedFinancial Record Checking
Sandip Jadhav, DAM,
04/12/2018
Discussion with TMO
& MO
Deola, Khuntewadi VisitVishal Naidu, M&E
Officer, 4/12/2018
Discussion with TMO
& MO
Meshi, Lohoner Visit Avinash Shinde, 4/12/2018
Vaitarna VisitAvinash Shinde,
21/12/2018
SC Vilholi Madhyamik
School, Aashram SchoolMR campagian Supervision
Dr.K.R.Bhoye
THO, 03/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHYes
Phc Jategaon
PHC Supervision, MR
Campagian Supervision,
Kayakalp Preparetion visit
Dr.K.R.Bhoye
THO, 03/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHYes
Devlali Hospital , Devlali
Highschool MR Campaiagn Supervioin
Dr.K.R.Bhoye
THO, 04/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHYes
RH Girnare, PHC
DhondegaonMR Campaiagn Supervioin
Dr.K.R.Bhoye
THO, 04/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHyes
Mumbai MCCOD Workshop
Dr.K.R.Bhoye
THO, 10/12/2018
11/12/2018
District Level and Phc
Level
At Facility level by PHC MO Block
Level by EOHYes
Sandarbha Seva Hospital
Launching of Intervention
to strengthen cancer
programme, NCD
programme Review
Dr.K.R.Bhoye
THO, 12/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHyes
RH Girnare,AFP and VPD Survillance
reporting,
Dr.K.R.Bhoye
THO, 17/12/2018
disscussion with MO,
HA ANM MPW
At Facility level by PHC MO Block
Level by EOHYES
Sc Girnare Anganwadi
Girnare
Sc Inspetion, MR
Supervision
Dr.K.R.Bhoye
THO, 17/12/2018
disscussion with MO,
HA ANM MPW,
Anganwadi worker
At Facility level by PHC MO Block
Level by EOHYes
District Nashik - DRCHO
District Nashik - DAM
District Nashik - M&E OFFICER
District Nashik -
District Nashik - THO Nashik
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Bhagur Nagarpalika
Dispensory and High Risk
Area Visit
MR Campagian SupervisionDr.K.R.Bhoye
THO, 19/12/2018
disscussion with MO,
HA ANM MPW,
Anganwadi worker
At Facility level by PHC MO Block
Level by EOHYes
Dhondegaon PHC expenses report collecttion S.H.Patil Acc 01/12/2018discussion with M.O
and BFAt phc Level
phc sayyad pimri expenses report collecttion S.H.Patil Acc 03/12/2018 discussion with clerk At phc Level
Jatgaon PHC pfms work jsy S.H.Patil Acc 05/12/2018discussion with M.O
and H.AAt phc Level
uphc devlali MR Campaiagn Supervioin S.H.Patil Acc 06/12/2018discussion with M.O
and H.Aand A.N.M.At phc Level
Shinde phc MR Campaiagn Supervioin S.H.Patil Acc 07/12/2018discussion with M.O
and H.Aand A.N.M.At phc Level
Shinde phcpfms work jsy cash book
chekingS.H.Patil Acc 10/12/2018 discussion with clerk At phc Level
Jatgaon PHC pfms work RKS S.H.Patil Acc 15/12/2018 discussion with clerk At phc Level
Dhondegaon PHC MR Campaiagn Supervioin S.H.Patil Acc 20/12/2018discussion with M.O
and H.Aand A.N.M.At phc Level
phc sayyad pimri pfms work jsy S.H.Patil Acc 24/12/2018discussion with M.O
and B.FAt phc Level
Shinde phc pfms work for Asha and fp S.H.Patil Acc 29/12/2018 discussion with clerk At uphc Level
phc sayyad pimri pfms work for Asha and fp S.H.Patil Acc 31/12/2018 discussion with clerk At phc Level
Pimplad SC MR Ralily S.A.Kadam, BCM,
1/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Vilholi SC , Bajrangwadi MR Session VisitS.A.Kadam, BCM,
03/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Belgoandhaga SC MR Session VisitS.A.Kadam, BCM,
04/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Mahirawani SC MR Session VisitS.A.Kadam, BCM,
05/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Talegaon SC MR Session VisitS.A.Kadam, BCM,
11/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Belgoandhaga SC MR Session VisitS.A.Kadam, BCM,
13/12/2018
discussion with ANM,
BF, Asha & BenifishierAt SC Level Yes
Sayyid Pimpri PHCHBNC Home Visit & Asha
& BF work Review
S.A.Kadam, BCM,
14/12/2018
discussion with MO,
LHV,HA,Asha,BFAt PHC Level Yes
Wasaligaon MR Session VisitS.A.Kadam, BCM,
19/12/2018
discussion with MO,
LHV,HA,Asha,BFAt SC Level Yes
Jategaon Asha & BF work Review
Monthly Meeting
S.A.Kadam, BCM,
21/12/2018
discussion with MO,
LHV,HA,Asha,BFAt PHC Level Yes
District Nashik - Accountant
District Nashik - BCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Vilholi SC MR Session VisitS.A.Kadam, BCM,
24/12/2018
discussion with MO,
LHV,HA,Asha,BFAt Disti. Level Yes
Shinde PHCAsha & BF work Review
Monthly Meeting
S.A.Kadam, BCM,
26/12/2018
discussion with MO,
LHV,HA,Asha,BFAt PHC Level Yes
Sayyaid Pimpri PHCAsha & BF work Review
Monthly Meeting
S.A.Kadam, BCM,
28/12/2018
discussion with MO,
LHV,HA,Asha,BFAt PHC Level Yes
Dhondegaon PHCAsha & BF work Review
Monthly Meeting
S.A.Kadam, BCM,
29/12/2018
discussion with MO,
LHV,HA,Asha,BFAt PHC Level Yes
Nashik HMIS, RCH, PMMVY, MRDr. M J Daware DEO,
Igatpuri, 6/12/2018DHO office Meeting
Titoli Nandgaonsado MR, HMIS PMMVYDr. M J Daware DEO,
10/12/2018
MR Visit and PHC
PMMVY HMIS
reporting
Ghoti Igatpuri MR, HMIS RCHDr. M J Daware DEO,
11/12/2018MR, HMIS RCH Visit
Wadivarhe MR HMIS RCH PMMVYDr. M J Daware DEO,
13/12/2018
MR HMIS RCH
PMMVY
Dhamangaon MR HMIS RCH PMMVYDr. M J Daware DEO,
14/12/2018
MR HMIS RCH
PMMVY
Wadivarhe MR HMIS RCH PMMVYDr. M J Daware DEO,
19/12/2018
MR HMIS RCH
PMMVY
Belgaonkurhe MR HMIS RCH PMMVYDr. M J Daware DEO,
21/12/2018
MR HMIS RCH
PMMVY
Dhamangaon MR HMIS RCH PMMVYDr. M J Daware DEO,
26/12/2018
MR HMIS RCH
PMMVY
Dhule Corporation
NUHM Office Kutumb
Kalyan Hospital Dhule
RCH & HMIS Work VisitP P Wani ( M &
E Officer 01/12/2018 ) …….. facility level yes _
Dhule THO Office Dhule RCH & HMIS Work VisitP P Wani ( M &
E Officer 03/12/2018 ) …….. facility level yes _
Sakri THO Office RCH & HMIS Work VisitP P Wani ( M &
E Officer 07/12/2018 ) …….. facility level yes _
Shirpur THO Office,
NUHM Shirpur SDH &
Council Shirpur
RCH & HMIS Work VisitP P Wani ( M &
E Officer 11/12/2018 ) …….. facility level yes _
THO office Shindkheda RCH & HMIS Work VisitP P Wani ( M &
E Officer 17/12/2018 ) …….. facility level yes _
District Nashik - Igatpuri DEO
District Dhule - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Sakri THO Office & SDH
Dondaicha Council
Dondaicha
RCH & HMIS Work VisitP P Wani ( M &
E Officer 20/12/2018 ) …….. facility level yes _
PHC Dusane & THO
SakriAudit Compaliance
Prashant Yeole
( DAM & BFO) 02/12/2018
)
…….. facility level yes _
THO Office Shindkheda
PHC BetavadAudit Compaliance
Prashant Yeole
( DAM & BFO) 16/12/2018
)
…….. facility level yes _
THO Dhule & PHC Arvi Balance Sheet
Prashant Yeole
( DAM & BFO)
20/12/2018 )
…….. facility level yes _
PHC Kapadan & THO
SakriAudit Compaliance
Prashant Yeole
( DAM & BFO) 27/12/2018
)
…….. facility level yes _
Dhule Corporation
NUHM Office Kutumb
Kalyan Hospital Dhule
PMMVY Work & ASHA
information and Visit
Mayur A Marathe RBSK (
DPC - PMMVY
01/12/2018 )
…….. facility level yes _
Dhule THO Office Dhule
PMMVY Beneficiary Form
collection Work & THO
discussion of pmmvy
meeting 4.12.18
Mayur A Marathe ( DPC -
PMMVY 3/12/2018 ) …….. facility level yes _
State Office Pune PMMVY Meeting &
Workshop attend at Pune
Mayur A Marathe ( DPC -
PMMVY 4/12/2018 ) …….. facility level yes _
Sakri THO Office
PMMVY Work information
and Visit
ASHA, BF Meeting of
PMMVY Work
Mayur A Marathe ( DPC -
PMMVY 7/12/2018 ) …….. facility level yes _
Dhule Corporation
NUHM Office Kutumb
Kalyan Hospital Dhule
PMMVY Work information
and Visit MOH Office
Meeting 10.12.2018 attend
Mayur A Marathe ( DPC -
PMMVY 10/12/2018 ) …….. facility level yes _
Shirpur THO Office,
NUHM Shirpur SDH &
Council Shirpur
PMMVY Work information
and Visit THO Office Out
Source DEO HA Meeting
11.12.2018 attend
Mayur A Marathe ( DPC -
PMMVY 11/12/2018 ) …….. facility level yes _
Dhule Corporation
NUHM Office Kutumb
Kalyan Hospital Dhule
PMMVY JSY DATA
Collect Work NUHM
Office Corporation Dhule
Mayur A Marathe ( DPC -
PMMVY 12/12/2018 ) …….. facility level yes _
Dhule Corporation
NUHM Office Kutumb
Kalyan Hospital Dhule
PMMVY Work & VisitMayur A Marathe ( DPC -
PMMVY 14/12/2018 ) …….. facility level yes _
District Dhule - DAM
District Dhule - RBSK Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Shirpur THO Office,
NUHM Shirpur SDH &
Council Shirpur
PMMVY Work information
and Visit THO Office
ASHA, BF Meeting
17.12.2018 attend 2 & 3 rd
installment due list etc work
Mayur A Marathe ( DPC -
PMMVY 17/12/2018 ) …….. facility level yes _
Sakri THO Office & SDH
Dondaicha Council
Dondaicha
PMMVY JSY DATA Work
information and Visit
Mayur A Marathe ( DPC -
PMMVY 20/12/2018 ) …….. facility level yes _
Dhule Corporation
NUHM Office
PMMVY Work information
and Visit & V C 21.12.18
Information
Mayur A Marathe ( DPC -
PMMVY 21/12/2018 ) …….. facility level yes _
Sakri THO Office
PMMVY Work information
and Visit
Out Source DEO Clerk
Meeting 26.12.18 attend &
PMMVY Portal Training
Work 2 & 3 rd installment
due list etc work
Mayur A Marathe ( DPC -
PMMVY 26/12/2018 ) …….. facility level yes _
Shirpur THO Office,
NUHM Shirpur SDH &
Council Shirpur
PMMVY Work information
and Visit
PMMVY SO Approval
Training Work of MO
NUHM Office
Mayur A Marathe ( DPC -
PMMVY 27/12/2018 ) …….. facility level yes _
Dhule THO Office &
Corporation Dhule
PMMVY Work information
and Visit
Budit Majuri Information
and Corporation Area V C
2.1.19 information of MOH
Mayur A Marathe ( DPC -
PMMVY 31/12/2018 ) …….. facility level yes _
SDH Muktainagar Audit Complience Shri.Nilesh B Patil (DAM)
13.12.2019
Instruction given to
MS,Clerk Facility Level Yes No
THO/SDH Muktainagar Audit Complience & PFMS Shri.Nilesh B Patil (DAM)
21.12.2019
Instruction given to
MS,Clerk Facility Level Yes No
SC Nachankheda, Nandra,
Khadgaon,Shahapur, Neri
Digar,THO Jamner
HWC SC Visit with State
Consultant At Jamner Block
Mr.Kishor P.Patil (Dist M
& E Officer) 14/12/2018
Instruction to THO, MO,
SN, ANM, Facility Level Yes --
District Jalgaon - DAM
District Jalgaon - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Parola, RH Parola
1) In RCH Portal EC, ANC
& Child entry must done as
early as possible. 2)
Monthly HMIS/DHIS Data
must be filled within time
limit as well as correctly.
Remove all critical data,
outliers from HMIS
Portal.3) PMMVY Entry
done on time to time
Mr.Kishor P.Patil (Dist M
& E Officer) 18/12/2018
Instruction to THO, MS,
MO, SN, ANM, Facility Level Yes --
1]BHUSAWAL NEW WORK UPHC
DINDALYL NAGAR
Mr.Yogesh N.Jaware
(Junior Engineer)
04.12.2018
WORK IS STOP ,SAND
NOT AVAILBLE
DISCUSSING WITH
CONTRACTORYES
2]RAVER AINPUR PHC VISIT
Mr.Yogesh N.Jaware
(Junior Engineer)
06.12.2018
NEW STAFF
QUARTER WORK
DISCUSSING WITH MEDICAL
OFFICER YES
3]JALGAON MHASAWAD PHC
Mr.Yogesh N.Jaware
(Junior Engineer)
07.12.2018
NEW LEBOUR
RENOVATION WORK
DISCUSSING WITH MEDICAL
OFFICER YES
4]BHUSAWALNEW WORK UPHC
DINDALYL NAGAR
Mr.Yogesh N.Jaware
(Junior Engineer)
11.12.2018
WORK IS STOP ,SAND
NOT AVAILBLE
DISCUSSING WITH
CONTRACTORYES
05]JALGAON KANLDA PHC
Mr.Yogesh N.Jaware
(Junior Engineer)
12.12.2018
NEW LEBOUR
RENOVATION WORK
DISCUSS WITH PLUMBER AND
MEDICAL OFFICERYES
07]BHUSAWAL UPHC BHUSAWAL
Mr.Yogesh N.Jaware
(Junior Engineer)
14.12.2018
WORK IS STOP ,SAND
NOT AVAILBLE
DISCUSSING WITH
CONTRACTORYES
08]JALGAONNEW WORK UPHC
DINDALYL NAGAR
Mr.Yogesh N.Jaware
(Junior Engineer)
18.12.2018
WORK IS STOP ,SAND
NOT AVAILBLE
DISCUSSING WITH
CONTRACTORYES
09]M.NAGARNEW WORK UPHC
DINDALYL NAGAR
Mr.Yogesh N.Jaware
(Junior Engineer)
19.12.2017
AYUSH WORK
PURPOSED
DISCUSSING WITH MEDICAL
OFFICER YES
11]BHUSAWALNEW WORK UPHC
DINDALYL NAGAR
Mr.Yogesh N.Jaware
(Junior Engineer)
28.12.2018
WORK IS STOP ,SAND
NOT AVAILBLE
DISCUSSING WITH
CONTRACTORYES
Bhusawal NUHM BF Meeting Mr,Pravin D Jagtap DCM
(03/12/2018)
All ASHA Programme &
MAASProgramme
Rewise for Cases and
Incentive & ASHA
Payment Balance Follw-
up & All ASHA
Indicator
Facility By Medical Officer NUHM No Facility
Bhusawal
Block Facilatator ASHA
Programme Implimentation
& HBNC Follw-up and
ASHA Payment Balance
Follw-up Meeting
Mr,Pravin D Jagtap DCM
(08/12/2018)
All ASHA Programme
Rewise for Cases and
Incentive & ASHA
Payment Balance Follw-
up & All ASHA
Indicator
Facility By Block Facilatator &
Medical Officer No Facility
Erandol BlockFacilatator Interviews
At Block Level
Mr,Pravin D Jagtap DCM
(12/12/2018)
ASHA Programme
Implimentation To BF
Facility By Block Facilatator &
Medical Officer No Facility
Nasik
ASHA Programme Re-
appropation Meeting
Divisional Level
Mr,Pravin D Jagtap DCM
(29/12/2018)
ASHA Programme
Implimentation
Expenduter Plaining
State Level & Dist Level Officer No Facility
District Jalgaon - Jr.Engineer
District Jalgaon - DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Take a review meeting of
Block Faciletetor and BCM
Review about New
appointment BF wise Non
performing asha. Take
review about bank and
adhar
hbnc tracking and RI
review. Reson of Low
expenditure .
take a review about
software performance
entries and payment balance
in software.
Take a review meeting of
Block Faciletetor and BCM
Review about New
appointment BF wise Non
performing asha. Take
review about bank and
adhar
hbnc tracking and RI
review. Reson of Low
expenditure .
take a review about
software performance
entries and payment balance
in software.
Meeting with mo and all
PHC staff new asha BF.
hbnc tracking and RI
review
Cross check of HBNC from
and asha visit at Field. So
many correction in the form
. No 100% visit
take a review about mmr
imr and discuss about asha
Check list
Meeting with mo and all
PHC staff new asha BF.
hbnc tracking and RI
review
Cross check of HBNC from
and asha visit at Field. So
many correction in the form
. No 100% visit
Dab PHC and Amlibari
SC
Mr.Prasad Sonar 24
.12.2018
Give instruction to asha
BF and LHV for timely
reporting of vpochers
PHC Level Yes NA
Dab PHC and Amlibari
SC
Mr.Prasad Sonar
15 .12.2018
Give instruction to asha
BF and LHV for timely
reporting of vpochers
PHC Level Yes NA
NA
Dhadgan BlockMr Prasad Sonar (DCM)
04.12.2018
Give instruction to asha
BF and BCM. And give
to notice to low
performing bf
District and Block Level Yes NA
District Nandurbar- DCM
Shahada BlockMr Prasad Sonar (DCM)
03.12.2018
Give instruction to asha
BF and BCM. And give
to notice to low
performing bf
District and Block Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
take a review about mmr
imr and discuss about asha
Check list
Meeting with mo and all
PHC staff new asha BF.
hbnc tracking and RI
review
Cross check of HBNC from
and asha visit at Field. So
many correction in the form
. No 100% visit
take a review about mmr
imr and discuss about asha
Check list
Training about HBNC form
feeding. And Diary. No
idea about feeding the
details. And not monitor at
PHC level.
take a review about mmr
imr and discuss about asha
Check list
visit to SC and attend RI
session at village level. And
check HBNC form of asha
and cross veryfy the asha
home visit.
Cross check of HBNC from
and asha visit at Field. So
many correction in the form
Review about New
appointment BF wise Non
performing asha. Take
review about bank and
adhar
Issues about reporting
incnetive not get to asha
from last two month
Attend asha monthlly
meeting at phc
Visit to sc .check asha
performing register pfms
sheet .check hbnc form and
Visit to LB W child home
visit
Cross check of HBNC from
and asha visit at Field. So
many correction in the form
Dekhwad PHCMr.Prasad Sonar
28.12.2018
Give instruction to asha
and BF for regular visit
to Child
PHC Level Yes NA
Lahana shahada PHC Mr.Prasad Sonar
27.12.2018
Give instruction to asha
BF and ANM LHVPHC Level Yes NA
Kathi PHC and Katih
SC
Mr.Prasad Sonar
26.12.2018
Give instruction to asha
BF and LHV for timely
reporting of vpochers
PHC Level Yes NA
Dab PHC and Amlibari
SC
Mr.Prasad Sonar 24
.12.2018
Give instruction to asha
BF and LHV for timely
reporting of vpochers
PHC Level Yes NA
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Review about New
appointment BF wise Non
performing asha. Take
review about bank and
adhar
take a review about mmr
imr and discuss about asha
Check list
visit to SC and attend RI
session at village level. And
check HBNC form of asha
and cross veryfy the asha
home visit.
Training about HBNC form
feeding. And Diary. No
idea about feeding the
details. And not monitor at
PHC level.
take review of RCH portal
entries in software.
Review about New
appointment BF wise Non
performing asha. Take
review about bank and
adhar
Training about BF new
format
Review about Protocol of
Dirriya Numoniya Sepsis.
Review about Doses.
Review of daily visit in
High sensitive block
Kathi PHC
1.RKS
Meeting Isues
2.RKS Expenditure .
3.Sickle Cell Solublity
Testing & MR Campion
Visit
Mr.Umesh Dilip Shinde
D.S./RKS coordinator.
5/12/2018
1.Discuss About Meeting
Of Rks EC,GB
2. Checked To
Expenditure Of RKS
Fund etc
PHC Level Yes NA
Jangthi PHC MR Campaining Visit
Mr.Umesh Dilip Shinde
RKS
coordinator.
6/12/2018
1.Checked Check List Of
Childs 2. Checked
Certificates
PHC Level Yes NA
RH Molgi
1.RKS
Meeting Isues
2.RKS Expenditure .
3.Sickle Cell Solublity
Testing & MR Campion
Visit
Mr.Umesh Dilip Shinde
RKS
coordinator.
7/12/2018
1.Discuss About Meeting
Of Rks EC,GB
2. Checked To
Expenditure Of RKS
Fund etc
RH Level Yes NA
Jangthi PHC MR Campaining Visit
Mr.Umesh Dilip Shinde
RKS
coordinator.
8/12/2018
1.Checked Check List Of
Childs 2. Checked
Certificates
PHC Level Yes NA
District Nandurbar- RKS Co-ordinator
Akkalkuwa Block PHC Mr.Prasad Sonar
29.12.2018
Give instruction to asha
BF and ANM LHVPHC Level Yes NA
Dekhwad PHCMr.Prasad Sonar
28.12.2018
Give instruction to asha
and BF for regular visit
to Child
PHC Level Yes NA
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Jangthi PHC MR Campaining Visit
Mr.Umesh Dilip Shinde
RKS
coordinator.
17/12/2018
1.Checked Check List Of
Childs 2. Checked
Certificates
PHC Level Yes NA
Jangthi PHC
1.RKS
Meeting Isues
2.RKS Expenditure .
3.Sickle Cell Solublity
Testing
4. Discuss VHNSC Bank
Sighneture Change Of
Secretary Asha
Mr.Umesh Dilip Shinde
RKS
coordinator.
27/12/2018
1.Discuss About Meeting
Of Rks EC,GB
2. Checked To
Expenditure Of RKS
Fund etc
4. Discuss VHNSC Bank
Sighneture Change Of
Secretary Asha Worker.
PHC Level Yes NA
PHC Gatadi
Navapur
1) Taking instruction to
complete RCH portal
registration and updation.
2) Take review for HMIS
data entry and instruct to
enter data of all data
element.
3) Check register for JSY
and Delivery .
Shri. Shailesh S. Gavit
M&E Officer Nandurbar
12/12/2018
Instruction to HA and
LHVFacility Level Yes
SDH Navapur
1) Taking instruction to
complete RCH portal
registration and updation.
2) Take instruction about
HMIS Portal data entry.
Shri. Shailesh S. Gavit
M&E Officer Nandurbar
18/12/2018
Instruction to Staff Nurse Facility Level Yes
PHC Ashate
1) Take instruction about
HMIS Portal data entry
2) Check register for JSY
and Delivery
3) Taking instruction to
complete RCH portal
registration and updation.
Shri. Shailesh S. Gavit
M&E Officer Nandurbar
29/12/2018
Instruction to HA and
LHVFacility Level Yes
Navapur Block
1) PMMVY Target
achivement is very low .
2) PMMVY Sukanu
meeting is pending
3 BLOCK fcilator meeting
and target given .
Shri Gangaram Valvi
DPC
05/12/2018
Instruct to THO THO level YES
Dhadgoan Block
1) PMMVY Target
achivement is very low .
2) PMMVY Sukanu
meeting is pending
3 BLOCK fcilator meeting
and target given .
Shri Gangaram Valvi
DPC
11/12/2018
Instruct to THO amd
MOTHO Level YES
Dhadgoan Block
1) PMMVY Target
achivement is very LOW
2) ANM ,BLOCK fcilator to
facilate to for enrolment of
new banificiary.
Shri Gangaram Valvi
DPC
12/12/2018
Instruct to PHC THO Level YES
District Nandurbar- M&E OFFICER
District Nandurbar- RBSK CO.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Shahada Block
1) PMMVY Target
achivement is very low .
2) PMMVY Sukanu
meeting is pending
3)Enrolment of new
banificiary
.
Shri Gangaram Valvi
DPC
13/12/2018
Instruct to THO and
MOTHO and upsc Level YES
Dhadgoan Block
1) PMMVY Target
achivement is very LOW
2) ANM ,BLOCK fcilator to
facilate to for enrolment of
new banificiary.
Shri Gangaram Valvi
DPC
14/12/2018
Instruct to PHC THO Level YES
Nandurbar Block
1) PMMVY Target
achivement is very low .
2) PMMVY Sukanu
meeting is pending
3)Enrolment of new
banificiary and 2nd and 3rd
due pendancy
.
Shri Gangaram Valvi
DPC
15/12/2018
Instruct to THO THO Level YES
Taloda bolck
1) Ashaa wise targrt and
achivement .
2) PMMVY Sukanu
meeting is pending
3)Enrolment of new
banificiary and 2nd and 3rd
due pendancy
.
Shri Gangaram Valvi
DPC
27/12/2018
Instruct to THO and
MOTHO and PHC Level YES
Akkalkuwa Block
1) Ashaa wise targrt and
achivement .
2) PMMVY Sukanu
meeting is pending
3)Enrolment of new
banificiary and 2nd and 3rd
due pendancy
.
Shri Gangaram Valvi
DPC
28/12/2018
Instruct to THO and
MOTHO and PHC Level YES
Taloda bolck
1) Ashaa wise targrt and
achivement .
2) Correction queues to be
correct. 3)Enrolment of new
banificiary and 2nd and 3rd
due pendancy
.
Shri Gangaram Valvi
DPC
29/12/2018
Instruct to THO THO and PHC Level YES
Shahada Block
1) Ashaa wise targrt and
achivement .
2) Correction queues to be
correct. 3)Enrolment of new
banificiary and 2nd and 3rd
due pendancy
.
Shri Gangaram Valvi
DPC
30/12/2018
Instruct to THO and
MOTHO and PHC Level YES
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Kathi phc ilr/df unit Not working
Mr. Gitesh R. Gavit Cold
Chain Technician.
05/12/2018
ILR Machine Repairing /
both machine servising
and cheking
Facility yes
B.A. Vihir PHC ILR Unit not work
Mr. Gitesh R. Gavit Cold
Chain Technician.
15/12/2018
there ILR
subzirocontroler
defective so new old
repaier ILR Instlation /
both machine servising
and cheking
Facility yes
Kakarda PHC Visit
Mr. Gitesh R. Gavit Cold
Chain Technician.
17/12/2018
both machine servising
and chekingFacility yes
Mandavi PHC Visit
Mr. Gitesh R. Gavit Cold
Chain Technician.
20/12/2028
both machine servising
and chekingFacility yes
Dab PHC Visit
Mr. Gitesh R. Gavit Cold
Chain Technician.
21/12/2018
both machine servising
and chekingFacility yes
RH Akkalkuwa Visit
Mr. Gitesh R. Gavit Cold
Chain Technician.
25/12/2018
both machine servising
and chekingPHC Facility yes
lahan shahada Tempreture show -1`c
Mr. Gitesh R. Gavit Cold
Chain Technician.
31/12/2018
ILR repairing and both
machine servising and
cheking
PHC Facility yes
RH Akkaklkuwa, PHC
Ohwa, Vadafali Tal.
Akkalkuwa
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
3)to Prepair Estimate For
Labour Room PHCs
Mr. Mayur K. Deore
Deputy Engineer
14.12.2018
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
3)to Prepair Estimate For
Labour Room PHCs
UPHC Shahada
1) to checkUPHC Shahada
Finishing Work In
Progress.
2) for Review of work in
Complete.
Mr. Mayur K. Deore
Deputy Engineer
17.12.2018
1) to checkUPHC
Shahada Finishing Work
In Progress.
2) for Review of work in
Complete.
RH Akkaklkuwa
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
Mr. Mayur K. Deore
Deputy Engineer
19.12.2019
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
RH Akkaklkuwa
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
03.12.2018
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
PHC Chinchapada,
Dodegaon, Gatadi,
Zamanzar tal. Navapur
1) to Prepair Estimate For
Labour Room PHCs
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
06.12.2018
1) to Prepair Estimate
For Labour Room PHCs
2) for Review of work in
Complete.
District Nandurbar- Cold Chain Technician
District Nandurbar- Dy.Engineer
District Nandurbar- Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Akkaklkuwa, PHC
Ohwa, Vadafali Tal.
Akkalkuwa
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
3)to Prepair Estimate For
Labour Room PHCs
Mr. Bushan D. Gangurde
Junior Engineer
14.12.2018
1) to check SNCU RH
Akkalkuwa Eletrification
Work In Progress.
2) for Review of work in
Complete.
3)to Prepair Estimate For
Labour Room PHCs
UPHC Shahada
1) to checkUPHC Shahada
Finishing Work In
Progress.
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
17.12.2019
1) to checkUPHC
Shahada Finishing Work
In Progress.
2) for Review of work in
Complete.
PHC Wavadi, Umran,
Pratappur Tal Navapur
1) to Prepair Estimate For
Labour Room PHCs
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
20.12.2020
1) to Prepair Estimate
For Labour Room PHCs
2) for Review of work in
Complete.
PHC Mandavai and Son
Tal. Dhadgaon
1) to Prepair Estimate For
HWC PHCs
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
24.12.2021
1) to Prepair Estimate
For HWC PHCs
2) for Review of work in
Complete.
PHC Ahste, Dhekwad,
Rakasawada
1) to Prepair Estimate For
HWC PHCs
2) for Review of work in
Complete.
Mr. Bushan D. Gangurde
Junior Engineer
27.12.2022
1) to Prepair Estimate
For HWC PHCs
2) for Review of work in
Complete.
PHC Mehakari,
Tal.Nagar, Dist.A.Nagar.
1.The drugs The drugs
stored properly in Pharmacy
but were not labelled.
2.PPH Protocol found to be
displayed in labor room,
drum
ready to attend patient in
labor. 3.Financial record
checking of
Sub Center & Primary
Health Center.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
01/12/2018
Instruct all staff to use
the RCH Portal
workplans for increasing
Delivery & Other
services.
Instruct All staff to
Maintan the Physical &
financial records
peroperly.
District, Block, PHC & SC Level Yes
SC Supa, PHC
Ruichhattrapati,
Tal.Parner, Dist.A.Nagar.
1. Delivery, immunisation,
ILR temperature, JSY, OPD
& IPD register updated.
2. Medicine stock book
updated & 3. IEC material
sufficiently present all over
PHC.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
03/12/2018
Instruct MO & All Staff
for updating all register
updated record.
District, Block, PHC & SC Level Yes
District Ahmednagar- DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Nimgaonjali, PHC
Dhandarfal, PHC
Chandanapuri, PHC
Gharagaon, PHC Bota,
THO Office Sangamner,
Tal.Sangamner,
Dist.A.Nagar.
1. Sathrog Visit &
discussion for the sathrog
reports.
2.Visit for the Yatra for
Walwane. 3. PHC & SC
were in Cleane condition.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
05/12/2018
Instruct MO & All Staff
for PHC & SC Facility
clearing place. Instruct
Pharmacy Officer to lable
all drugs properly,
Maintain Daily stock
registar & Expiry
register.
District, Block, PHC & SC Level Yes
SC Uakkadgaon, PHC
Takali Kazi, Tal.Nagar,
Dist.A.Nagar.
RCH Portal Entry &
Aadhaar No., Bank Details,
HMIS Portal reports Check
& RCH, Fmaily Planing
Records Check &
Discussion.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
13/12/2018
Instruct MO & All Staff
for updating RCH Portal
entry. Instruct MO &
other staff to collect SC
HMIS Portal formats at
PHC Level.
District, Block, PHC & SC Level Yes
THO Office Parner,
Tal.Parner, Dist.A.Nagar.
1.RCH Reg. , Delivary and
Regester Chacked .
2.PHC were in Cleane
condition. 3.RCH Portal
Entryes were not done in
RCH Regester.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
27/12/2018
Instruct All staff to
Maintan the Physical &
financial records
peroperly.
District, Block, PHC & SC Level Yes
PHC Astagaon, PHC
Savalivihir, Tal.Rahata,
THO Office Kopargaon,
Tal.Kopargaon,
Dist.A.Nagar.
RCH Portal Entry &
Aadhaar No., Bank Details,
HMIS Portal reports Check
& RCH, Fmaily Planing
Records Check &
Discussion.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
29/12/2018
Instruct MO & All Staff
for updating RCH Portal
entry. Instruct MO &
other staff to collect SC
HMIS Portal formats at
PHC Level.
District, Block, PHC & SC Level Yes
Tho Office Shrirampur,
Tal.Shrirampur,
Dist.A.Nagar.
1.The drugs The drugs
stored properly in Pharmacy
but were not labelled.
2.PPH Protocol found to be
displayed in labor room,
drum
ready to attend patient in
labor. 3.Financial record
checking of
Sub Center & Primary
Health Center.
Dr. S.N.Sangale, DHO
Ahmednagar, Date
30/12/2018
Instruct all staff to use
the RCH Portal
workplans for increasing
Delivery & Other
services.
Instruct All staff to
Maintan the Physical &
financial records
peroperly.
District, Block, PHC & SC Level Yes
PHC- Devgaon
Equipment maintanance &
repair record not
maintain.All Colour coded
buckets & liners not
available as per BMW Act
2016.
DPM,Dr. Amol shinde
12-12-2018yes Facility level
District Ahmednagar- DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC- Kolgaon
All Colour coded buckets
& liners not available as per
BMW Act 2016.Monthly
Quality Audit
(PSS,Medical,Priscription),
Annexure A report,Monthly
Quality Team ,Infection
Control & Cleanliness
Committee meeting record
not found.
Dr. Amol shinde
21-12-2018
All Colour coded
buckets & liners should
be available as per
BMW Act 2016.
Monthly Quality Audit
(PSS,Medical,Priscriptio
n),Annexure A
report,Monthly Quality
Team ,Infection Control
& Cleanliness Committee
meeting should conduct
regularly & maintain
record..
Facility level
Rh Parner
All Colour coded buckets
& liners not available as
per BMW Act 2016. ODF
Block gap closure action
plan not prepared
Dr. Shinde Rahul ,(QA Co.)
date:-11 /12/2018
All Colour coded
buckets & liners should
be available as per
BMW Act 2016. Action
plan for ODF block gap
closure should prepare
on priority basis as per
guideline.
Facility Level / District level noFacility Level /
District level
PHC Kolgaon
All Colour coded buckets
& liners not available as per
BMW Act 2016.Monthly
Quality Audit
(PSS,Medical,Priscription),
Annexure A report,Monthly
Quality Team ,Infection
Control & Cleanliness
Committee meeting record
not found.
Dr. Shinde Rahul ,(QA Co.)
date:- 21/12/2018
All Colour coded
buckets & liners should
be available as per
BMW Act 2016.
Monthly Quality Audit
(PSS,Medical,Priscriptio
n),Annexure A
report,Monthly Quality
Team ,Infection Control
& Cleanliness Committee
meeting should conduct
regularly & maintain
record..
Facility Level/District Level no
Facility
Level/District
Level
PHC Nighoj
All Colour coded buckets
& liners not available as per
BMW Act 2016.Monthly
Quality Audit
(PSS,Medical,Priscription),
Annexure A report,Monthly
Quality Team ,Infection
Control & Cleanliness
Committee meeting record
not found.
Dr. Shinde Rahul ,(QA Co.)
date:- 29/12/2018
All Colour coded
buckets & liners should
be available as per
BMW Act 2016.
Monthly Quality Audit
(PSS,Medical,Priscriptio
n),Annexure A
report,Monthly Quality
Team ,Infection Control
& Cleanliness Committee
meeting should conduct
regularly & maintain
record..
Facility Level noFacility Level /
District level
PHC Takali Khatgaon RKS,AMG,UF
Miss.Lanke Shilpa -RKS
Co-ordinater
date - 11/12/2018
Give Instruction to
MO,THOMO,THO Yes NO
RH Sangamner RKS,AMG,UF
Miss.Lanke Shilpa -RKS
Co-ordinater
date - 21/12/2018
Give Instruction to
MS,AS, ClerkMS Yes NO
PHC Chandanapuri RKS,AMG,UF
Miss.Lanke Shilpa -RKS
Co-ordinater
date - 22/12/2018
Give Instruction to
MO,THOMO,THO Yes NO
PHC Takli kazi RKS,AMG,UF
Miss.Lanke Shilpa -RKS
Co-ordinater
date - 26/12/2018
Give Instruction to
MO,THOMO,THO Yes NO
District Ahmednagar- QA Co-ordinator
District Ahmednagar- RKS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHc Takali khatgaon MR Supervision
Mrs. Nagargoje K.s.
11/12/ 2018
IPHS CO.
Should be update 6D format Facility level YES
PHc 1) Devlali pravra,2)
Marathi school, 3) school
global wisidom.
MR Supervision
Mrs. Nagargoje K.s.
13/12/ 2018
IPHS CO.
Should be update 6D format Facility level YES
PHC 1) Belapur ,2)
Belapur khurd,MR Supervision
Mrs. Nagargoje K.s.
13/12/ 2018
IPHS CO.
Should be update 6D format Facility level YES
Zp school
undewasti,Matapur,
Anganwadi
MR Supervision
Mrs. Nagargoje K.s.
13/12/ 2018
IPHS CO.
Should be update master file Facility level YES
PHc Takali khatgaon MR Supervision
Mrs. Nagargoje K.s.
25/12/ 2018
IPHS CO.
Should be update master file Facility level YES
Wadgaon Gupta,
P.s.Nagar
SC visit & check, NRHM,
RCH, RNTCP Record
checking, Aganwadi check,
primry School ,aganwadi,
MR Supervision, BTF /Core
committee Meeting
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 01/12/2018
Instrcuctions given. - YES
Burhanagar, Nagardevale,
P.S.Nagar
MR Supervision SC visit &
Aganwadcheck, NRHM,
RCH, RNTCP Record
checking, Aganwadi check
RBSK Meeting,
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 03/12/2018
Instrcuctions taken. - YES
Takali khatgaon,
Kharekarjune
MR SupervisionPHC SC
visit & Aganwadcheck,
NRHM, RCH, RNTCP
Record checking,
Aganwadi check RBSK
Meeting,
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 05/12/2018
Instrcuctions given. - YES
Burhanagar, Nagardevale,
P.S.Nagar
MR SupervisionPHC SC
visit & Aganwadi & School
supervisioncheck, NRHM,
RCH, Aganwadi sevika
meeting,Private doctor
BNH Supervision
inspection
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 06/12/2018
Instrcuctions given. - YES
walunj
MR Supervision PHC Visit
& SC Visit NRHM, RCH,
RNTCP record Check,
Nalanda English School, ZP
School
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 7/12/2018
Instrcuctions given. - YES
Navnagapur
MR Supervision PHC Visit
& SC Visit, Swami
Vivekanand Primary,
Secondary School
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 10/12/2018
Instrcuctions given. - YES
District Ahmednagar- IPHS Co-ordinator
District Ahmednagar- THO Nagar
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Jeur
MR Supervision PHC Visit
& SC Visit NRHM,
RCH, RNTCP record
Check, Yashashree school,
Aganwadi check
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 11/12/2018
Instrcuctions taken. - YES
Nagardevale
MR Supervision SC visit &
check, NRHM, RCH,
RNTCP Record checking,
Aganwadi
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 12/12/2018
Instrcuctions given. - YES
Darewadi, narayan doh
MR Supervision SC visit &
check,St.michael School
MR Supervision
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 13/12/2018
Instrcuctions taken. - YES
takali kazi
MR Supervision SC visit &
check, MR Supervision
Aganwadi visit
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 14/12/2018
Instrcuctions given. - YES
Dehare
MR Supervision PHC SC
visit & check, MR
Supervision Mobile team
visit
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 15/12/2018
Instrcuctions given. -
NimblakMR Supervision SC visit &
check, MR Supervision visit
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 17/12/2018
Instrcuctions given. - YES
Mehekari, BarababhaliMR SupervisionPHC SC
visit & Aganwadi & School
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 18/12/2018
Instrcuctions given. - YES
Chas
MR Supervision PHC visit
& Aganwadcheck, NRHM,
RCH, RNTCP Record
checking,
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 26/12/2018
Instrcuctions given. - YES
Nimblak
MR Supervision SC visit &
Aganwadcheck, NRHM,
RCH, RNTCP Record
checking,
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 27/12/2018
Instrcuctions given. - YES
DongarganMR Supervision SC visit &
NRHM, RCH, check
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 28/12/2018
Instrcuctions given. - YES
PS NagarMO, LHV, HA, Clerk
Meeting
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 29/12/2018
Instrcuctions given. - YES
Dehare
MR Supervision PHC visit
& Aganwadcheck, NRHM,
RCH, RNTCP Record
checking,
Dr. J.S. Mandge THO
Nagar Dist. Ahmednagar,
Date 31/12/2018
Instrcuctions given. - YES
District Ahmednagar- THO Parner
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Kanoli, PHC Ashwi,
Tal.Sangamner, SC
Kajuleharya, PHC
Khadakwadi, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI & MR
Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
01/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Supa, PHC
Ruichhattrapati,
Tal.Parner, SC Darewadi,
PHC Takali Kazi,
Tal.Nagar, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
Delivery very low.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
03/12/2018
Colour coded buket tobe
kept.
Delivery to be improved.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO ANMYes
Yes
PHC Devlali Pravara,
Tal.Rahuri, PHC
Padhegaon, THO Office
Shrirampur,
Tal.Shrirampur,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
05/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Narayangavhan, SC
Kadus, PHC Palawe Kh.,
Tal.Parner, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
Delivery very low.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
06/12/2018
Colour coded buket tobe
kept.
Delivery to be improved.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO ANMYes
Yes
THO Office Parner,
Tal.Parner, THO Office
Shrigonda, Tal.Shrigonda,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
07/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Jawala, SC
Devibhoyare, PHC Nighoj,
SC Padalidrya, PHC
Alkuti, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
08/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Kajuleharya, PHC
Khadakwadi, PHC
Bhalwani, PHC
Kanhoorpathar,
Tal.Parner, Dist.A.Nagar.
Cleaning outside not done.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
11/12/2018
Cleaning should be done.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
ANM ANMYes
Yes
SC Supa, PHC
Ruichhattrapati, PHC
Palawe, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
12/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Uakkadgaon, PHC
Takalikazi, PHC Chas,
Tal.Nagar, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
13/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Alkuti, PHC Nighoj,
Tal.Parner, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
Delivery very low.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
14/12/2018
Colour coded buket tobe
kept.
Delivery to be improved.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO ANMYes
Yes
SC Jamgaon, PHC
Bhalwani, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
18/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Jawala, SC
Ralegantherpal, SC
Kurund, PHC Nighoj, SC
Lonimavala, PHC Alkuti,
PHC Palawe, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
Delivery very low.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
21/12/2018
Colour coded buket tobe
kept.
Delivery to be improved.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO ANMYes
Yes
SC Wadner, PHC Nighoj,
Tal.Parner, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
22/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
SC Pokhari, SC Palaspur,
PHC Khadakwadi, PHC
Bhalwani, Tal.Parner,
Dist.A.Nagar.
Bio-Medical guidelines not
followed.
Delivery very low.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details.
Dr. P. S. Lalge THO Parner
& DRCHO Date
29/12/2018
Colour coded buket tobe
kept.
Delivery to be improved.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO ANMYes
Yes
SC Ralegantherpal, PHC
Nighoj, PHC Palwe,
Tal.Parner, PHC Chas,
Tal.Nagar, Dist.A.Nagar.
Bio-Medical guidelines not
followed.
RCH Portal data entry not
done at Aadhaar No. &
Bank Details. RI Sessions.
Dr. P. S. Lalge THO Parner
& DRCHO Date
31/12/2018
Colour coded buket tobe
kept.
RCH Portal data entry
not done at Aadhaar No.
& Bank Details.
MO Level MO LevelYes
No
MO Level
HFWTC Pune - Aundh
Pune
Audit Compliance of Pune
District .
Mr.Ganesh Jagtap CPM Dt -
12/12/2018NO DD Level NO No
HFWTC Pune - Aundh
Pune
Audit Compliance of Satara
District .
Mr.Ganesh Jagtap CPM Dt -
13/12/2018NO DD Level NO No
HFWTC Pune - Aundh
Pune
Audit Compliance of
Solapur District .
Mr.Ganesh Jagtap CPM Dt -
14/12/2018NO DD Level NO No
HFWTC Pune
Traning of NUHM baches (
bach -1)
1) HMIS Portal , RCH
Portal, DHIS-2 Softwear
Mr. Dhanaji Kaulge Pune,
M & E officer Dt -
11/12/2018
NO DD Level NO No
Circle Pune - CPM
Circle Pune - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
HFWTC Pune
Traning of NUHM baches (
bach -2)
1) HMIS Portal , RCH
Portal, DHIS-2 Softwear
Mr. Dhanaji Kaulge Pune,
M & E officer Dt -
12/12/2018
NO DD Level NO No
Panchyat samitte Bhor1Low performanc ein RCH
Portal & JSY
M&E,Mrs.Kejkar R.G 5-12-
2018
Instructions are given to
THOAt Block Level
PHC Neree1Low performanc ein RCH
Portal & JSYMrs.Kejkar R.G 5-12-2018
Instructions are given to
LHV & MO
Instructions are given to LHV &
MO
Panchyat Samitte Velha Reporting IssueMrs.Kejkar R.G 21-12-
2018
Instructions are given to
THOAt Block Level
PHC Karanjvane1Low performanc ein RCH
Portal & JSY
Mrs.Kejkar R.G 21-12-
2018
Instructions are given to
LHV & MO
Instructions are given to LHV &
MO
Village Antroli MMU 1.About Low performance
in ANC & PNC
Mrs.Kejkar R.G 21-12-
2018
Instructions are given to
M.O
PHC Wathar ki , SC
Triputi
1)Free diet & Jssk Pol
Vouchers are not
completely & vehicle Log
book not completed.2) SC
leval Fund not
transferred.3) Ledger book
uncompleted 4) less
cleanliness at SC area
internal as well as out side
SC
Dr. Dilip Mane DHO Z
P Satara Dt. 12-12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Umbraj, PHC Kale
,SC Khodashi
Meeting Register
Uncompleted,Meeting
Notice Register
Uncompleted,Jsy Cash
Book Uncompleted
Dr. Dilip Mane DHO Z
P Satara Dt.10-12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Tadawale THO
Koregaon
1)MCTS & DHIS data entry
status cheking 2) JSY exp.
Reveve sc wise & other
head exp -3) FP Cases
discussion
Dr. Dilip Mane DHO Z
P Satara Dt. 14-12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Morgiri, SC
Mandure
Less Cleanliness internal as
well as Out side PHC area,
Cleaning time table not
perfectly followed , Review
taken of all program
Dr. Dilip Mane DHO Z
P Satara Dt. 23-12-2018
Instruction given releted
to issues identifiedPHC level No No
District Pune - M&E OFFICER
District Satara - DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Koregaon PHC
Wathar ki
Less cleanliness at PHC and
SC inside and Out side PHC
Area, Cleaning time table
not followed O HBV not
given to all deliveries , ILR
Tempreture not written,
Email register not
maintained at THO office ,
Dr. Sachin Patil Dt. 06-
12-2018
Instruction given releted
to issues identifiedPHC level No No
THO Satara , PHC
Kanher , SC Kondave
R14 R17,R17 register not
completed and faultily
recorded , HRA and RI drop
out found , Email register
not maintanined , Review of
all program , Open vial
policy used
Dr. Sachin Patil Dt. 12-
12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Umbraj, SC
Khodashi THO Karad
Review of RHC,
Immunization, DHIS 2
Error , MCTS training taken
in Block meeting in the
presence of DHO and
DRCHO, THO Dr. Sachin Patil Dt. 14-
12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Salave, PHC Kale
THO Patan
Less cleanliness at PHC and
SC inside and Out side PHC
Area, Cleaning time table
not followed O HBV not
given to all deliveries , ILR
Tempreture not written,
Email register not
maintained at THO office ,
Dr. Sachin Patil Dt. 17-
12-2018
Instruction given releted
to issues identifiedPHC level No No
THO Phaltan ,SDH
Phaltan
THO Office Record
maintain well, PalKhi
Niyogan Meeting attend.
Dr. V.V. Patil DPM Dt 12-
12-2018
Instruction given releted
to issues identified - No
PHC Kanher,
Rcord keeping well,
Delivery in PHC Building
not Satishfactory, less data
entry in RCH Software,
PHC area keep clean
Dr. V.V. Patil DPM Dt 06-
12-2018
Instruction given releted
to issues identified - No
PHC Nagthne
Rcord keeping good ,
Delivery in PHC Building
Satishfactory, PHC area
keep clean, Improvement
under Kayakalp
Dr. V.V. Patil DPM Dt 16-
12-2018
Instruction given releted
to issues identified - No
District Satara -
District Satara - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Patan
Rcord keeping Well ,
Delivery in RH Building
Satishfactory, RH Building
area keep clean,
Dr. V.V. Patil DPM Dt 21-
12-2018
Instruction given releted
to issues identified - No
PHC Limb
Rcord keeping good ,
Delivery in PHC Building
Satishfactory, PHC area
keep clean, Improvement
under Kayakalp
Dr. V.V. Patil DPM Dt 29-
12-2018
Instruction given releted
to issues identified - No
THO Patan , PHC Keral
1) Record Varification done
2) AG Audit para guidline
information given 3)
Familiy planning Grant
problem solved
Mr. Vijay Gaikwad DAM
03-12-2018Instruciton Given Block leavel - -
PHC Pachgani
AG Audit and Dive comm
Audit . Fund Trnasfer , BRS
record, Expenditure, and
other document checkedMr. V B Gaikwad DAM
Dt.:- 10-12-2018NO -- NO
THO Satara PHC
Nagthane
Fund Trnasfer , BRS record,
Expenditure, and other
document checkedMr. V B Gaikwad DAM
Dt.:-22-12-2018NO -- NO
Anewadi SC
Visited SC for ACS
Madam visit .All Record
verified
Mr. Anandrao Kumbhar
S O Z P Satara Dt
12-12-2018
DHIS2 & MCTS
information.PHC Saigaon Yes --
Karad MCL/BDO
Births & Deaths record
verified
Mr. Anandrao Kumbhar
S O Z P Satara Dt
07-12-2018
All Births&Deaths 2018
verified from registers. MCL/BDO Karad Yes --
Wai MCL/BDO
Births & Deaths record
verified
Mr. Anandrao Kumbhar
S O Z P Satara Dt
17-12-2018
All Births&Deaths 2018
verified from registers. MCL/BDO Wai Yes --
Kole PHC & Chachegaon
SC
SCD Record verified &
omissions found out by
house to house survey.
Mr. Anandrao Kumbhar
S O Z P Satara Dt
23-12-2018
4 omissions of resident
births found,included in
Sep.17 SCD Report. MO PHC Kole Yes --
Salve PHC &Mahind SC
SCD Record verified &
omissions found out by
house to house survey.
Mr. Anandrao Kumbhar
S O Z P Satara Dt
24-12-2018
3 omissions of resident
births found,included in
Sep.17 SCD Report. MO PHC Salve Yes --
Tarale PHC & Vajroshi
SC
SCD Record verified &
omissions found out by
house to house survey.
Mr. Anandrao Kumbhar
S O Z P Satara Dt
31-12-2018
4 omissions of resident
births & 2 deaths
found,included in Sep.17
SCD Report.
MO PHC Tarale Yes --
1)No. of non performing
asha was zero
Given Instruction to
concern bf and bcmPhc level no
2) Software entry was in
progess for month Aug
2018
Given Instruction to
concern bf and bcmPhc level no
District Satara - DAM
District Satara - SO
District Satara - DCM
phc BavdhanDCM KARAN JAGTAP
03/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
3) remaining compensation
software entry
Given Instruction to
concern Bf and BCMPhc level no
Commissionor office,pune NHM Audit Report DCM KARAN JAGTAP
12/12/2018
Not chacked by Dy
Commissionor,
(Tapasani),Pune
1)Zero performance in
PPIUD activity.
Given Instruction to
concern Tho and BCMTho level no
2) There are 24 asha
performed as like as poor
performance.
Given Instruction to
concern Tho and BCMTho level no
3)Asha Induction training
batch was not conducted till
date.
Given Instruction to
concern Tho and BCMTho level no
1)Poor performance under
follow up of LBW babies by
Asha
Given Instruction to
concern Bf and BCMPhc level no
2)Not found some letters
given by district office
Given Instruction to
concern Bf and BCMPhc level no
3) Near about Rs 45000 /-
pending incentives of asha
under JSY up to Aug 2018
Given Instruction to
concern Bf and BCM
and issued letter to
Medical Officer
Phc level no
Commissionor office,pune NHM Audit Report DCM KARAN JAGTAP
17/12/2018
Find some currections in
Audit report no
THO Koregaon PHC
Wathar ki
Less cleanliness at PHC and
SC inside and Out side PHC
Area, Cleaning time table
not followed O HBV not
given to all deliveries , ILR
Tempreture not written,
Email register not
maintained at THO office ,
Smt Anamika P Ghadage M
& E offficer Z P Satara
Dt. 04-12-2018
Instruction given releted
to issues identifiedPHC level No No
THO Satara , PHC
Kanher , SC Kondave
R14 R17,R17 register not
completed and faultily
recorded , HRA and RI drop
out found , Email register
not maintanined , Review of
all program , Open vial
policy used
Smt Anamika P Ghadage M
& E offficer Z P Satara
Dt. 6-12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Umbraj, SC
Khodashi THO Karad
Review of RHC,
Immunization, DHIS 2
Error , MCTS training taken
in Block meeting in the
presence of DHO and
DRCHO, THO
Smt Anamika P Ghadage M
& E offficer Z P Satara
Dt. 14-12-2018
Instruction given releted
to issues identifiedPHC level No No
Tho WaiDCM KARAN JAGTAP
4/12/2018
Phc Chinchner vandanDCM KARAN JAGTAP
06/12/2018
District Satara - M&E OFFICER
phc BavdhanDCM KARAN JAGTAP
03/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Salave, PHC Kale
THO Patan
Less cleanliness at PHC and
SC inside and Out side PHC
Area, Cleaning time table
not followed O HBV not
given to all deliveries , ILR
Tempreture not written,
Email register not
maintained at THO office ,
Smt Anamika P Ghadage M
& E offficer Z P Satara
Dt.17-12-2018
Instruction given releted
to issues identifiedPHC level No No
PHC Kavathe
,Cash Book Uncompleted,
Bank Reconcilation
Uncompleted,Cash Book
Uncompleted
Dr.Sandip M Yadav THO
WAI 12/12/2018
3) Showcause Letter
issue by to MOPHC Level Yes -
Sc- Panchwad
Meeting Notice Book
uncompleted JSY Register
Uncompleted,Jsy Card
Uncompleted,Untied Cash
Book Uncompleted,Meeting
Register Uncompleted
Dr.Sandip M Yadav THO
WAI 07/12/2018
3) Showcause Letter
issue by to ANMSc & Phc Level Yes -
Sc- Khavali No IssuesDr.Sandip M Yadav THO
WAI 10/12/2018NA NA No -
Sc- Jamb
JSY Cash Book
Uncompleted, Bank Pass
Book Uncompleted,Untied
& ANG Cash Book
Uncompleted
Dr.Sandip M Yadav THO
WAI 12/12/2018
3) Showcause Letter
issue by to ANMSc & Phc Level Yes -
Sc- Vele
Meeting Register ,JSY Cash
Book Uncompleted, Bank
Pass Book
Uncompleted,Jsy Card
Uncompleted
Dr.Sandip M Yadav THO
WAI 13/12/2018
3) Showcause Letter
issue by to ANMSc & Phc Level Yes -
PHC - Bhuinj
FMR Uncompleted,Cash
Book Uncompleted, Bank
Reconcilation
Uncompleted,Cash Book
Uncompleted
Dr.Sandip M Yadav THO
WAI 2018/12/2018
3) Showcause Letter
issue by to MOPHC Level Yes -
Sc-Kikali
Jsy Card
Uncompleted,Untied Cash
Book Uncompleted,Meeting
Register Uncompleted
Dr.Sandip M Yadav THO
WAI 20/12/2018
3) Showcause Letter
issue by to ANMSc & Phc Level Yes -
Sc- Chandak No IssuesDr.Sandip M Yadav THO
WAI 21/12/2018NA NA No -
District Satara - THO WAI
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC - Malatpur No IssuesDr.Sandip M Yadav THO
WAI 31/12/2018NA NA No -
PHC - Bavdhan
FMR Uncompleted,Cash
Book Uncompleted, Bank
Reconcilation
Uncompleted,Cash Book
Uncompleted,Ledger
uncompleted,Meeting
Register uncompleted
Ganesh B Yadav Tho
Accountant
14/12/2018
3) Showcause Letter
issue by to MOPHC Level Yes -
PHC - Bhuinj No Issues
Ganesh B Yadav Tho
Accountant
17/12/2018
NA PHC Level NO -
PHC - Kavathe
FMR Uncompleted,Cash
Book Uncompleted, Bank
Reconcilation
Uncompleted,Cash Book
Uncompleted,Ledger
uncompleted,Meeting
Register uncompleted
Ganesh B Yadav Tho
Accountant
20/12/2018
3) Showcause Letter
issue by to MOPHC Level Yes -
PHC Malatpur
FMR Uncompleted,Cash
Book Uncompleted, Bank
Reconcilation
Uncompleted,Cash Book
Uncompleted,Ledger
uncompleted,Meeting
Register uncompleted
Ganesh B Yadav Tho
Accountant
21/12/2018
3) Showcause Letter
issue by to MOPHC Level Yes -
PHC Bibi
Nrhm cash Book Update
upto Sept 17. Rks meeting
Not Done in this monts Jsy
Physical Target is Not
achieved praportionately,
MR.DR V V Pote (Tho
Phaltan) 10.12.2018
As per instrructions
given by us in visit
AT Block Level Letter Given to
InstituteYes
PHC Barad
Nrhm cash Book Update
upto Sept 17. Jsy & Fp
Physical Target is Not
achieved praportionately,
21.12.2018As per instrructions
given by us in visit
AT Block Level Letter Given to
InstituteYes
PHC Taradgoan
Nrhm cash Book Update
upto Sept 17. Jsy Physical
Target is Not achieved
praportionately,
MR.Rajendra
Nanaware(Block
Accountant Phaltan
)13.12.2018
As per instrructions
given by us in visit
AT Block Level Letter Given to
InstituteYes
District Satara - Accountant
District Satara - THO Phaltan
District Satara - Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Sakharwadi
Nrhm cash Book Update
upto Sept 2018 Bur Brs
was worng free diet
Expenditure Not Done in
April to Dec 2018
27.12.2018As per instrructions
given by us in visit
AT Block Level Letter Given to
InstituteYes
PHC Barad
Nrhm cash Book Update
upto Sept 17. Jsy Physical
Target is Not achieved
praportionately,
29.12.2018As per instrructions
given by us in visit
AT Block Level Letter Given to
InstituteYes
Lake of co-ordination
between PHC level
supervisiory staff
DHIS 2 Errors are not
corrected within time
No use of Bio Metric
Attendance Machine by
PHC Staff
Lake of co-ordination
between PHC level
supervisiory staff
Male HA Record not
available for Verification
and LHV Registers and not
updated
MCTS Due services of
ANC & Child record not
maintain
subcentre primises was not
clean
SC Delivery proportion is
very low
Financial Record iwas
Incomplete
Lake of co-ordination
between MO & Clerk
ANC registration not
achieved in proportion
SC Premises is not properly
cleaned and maintained
FP Target is not achieved in
proportion
ANM Record was not
updated
MPW Record wass
incomplete
All Physical Targets viz FP,
ANC Registration, RI are
not achieved in proportion
SCKhedDr.R.T. Jadhav (THO)
23/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
PHC TadawaleDr.R.T. Jadhav (THO)
21/12/2018SC And PHC Level Yes
PHC KinhaiDr.R.T. Jadhav
(THO)17/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
SC BichukaleDr.R.T. Jadhav (THO)
15/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
PHC PalashiDr.R.T. Jadhav (THO)
10/12/2018
Oral Instruction Given to
Supervisiory staffPHC Level Yes
District Satara - THO
Phc Wathar StationDr.R.T. Jadhav (THO)
07/12/2018
Oral Instruction Given to
Supervisiory staffPHC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Premises and area is not
clean and maintained
properly
FP Target is not achieved in
proportion
Financial record not
maintained properly.
ANM not residing at
subcenter
No NRHM Record found at
subcentre
ANM not residing at
subcenter SC Delivery
proportion is very low
MCTS Due services of
ANC & Child record not
maintain
Line Listing of Death
Feeded in DHIS 2 not done
RI Card of ANC & Children
are incomplete
ANM not residing at
subcenter, so Delivery at
SC building not done
All Physical Targets viz FP,
ANC Registration so and
MCTS Data Entry, RI are
not achieved in proportion
SC Premises is not clean
and maintained
PHC _Wathar StationStock Register Entries are
incompleteMS T.S.Shaikh 06/12/2018
Instructions given for
corrective actions and
BRS done
PHC Level Yes
RKS EC GB Meeting are
not taken quarterly as per
norms
Yes
Cash Book Incomplete NO
Vouchers not available for
verificationYes
Stock Register Entries are
incomplete
Ledger & Advance Register
not Maintained Manuarlly
BRS not Prepare Montlhy
PHC _Wathar KiroliNo Record Found for
VerificationMS T.S.Shaikh 20/12/2018 Letter Issued PHC Level Yes
PHC _Kinahai MS T.S.Shaikh 10/12/2018
Instructions given for
corrective actions to
complete record RKS
audit
PHC Level
PHC _Palashi MS T.S.Shaikh 12/12/2018
Instructions given for
corrective actions to
complete record before
IV quarter Audit
PHC Level Yes
District Satara - Accountant
SC NigadiDr.R.T. Jadhav (THO)
31/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
SC BhoseDr.R.T. Jadhav (THO)
29/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
SC EkambeDr.R.T. Jadhav (THO)
27/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
SC ChimangaonDr.R.T. Jadhav
(THO)24/12/2018
Instructions issued for
corrective actionsSC And PHC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC_ RahimatpurNo Record Found for
VerificationMS T.S.Shaikh 23/12/2018 Letter Issued PHC Level NO
PHC_TadawaleNo Record Found for
VerificationMS T.S.Shaikh 27/12/2018 Letter Issued PHC Level NO
1) MCTS Due services of
ANC & Child record not
maintain of July 17
2) There is no idea of
MCTS user name &
password to HA Male
3) Also no idea of JSY
Private Benificiary
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
PHC Saigaon, SC Dare
Bk, Karandi Dr. A.S. Patil 10/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Kusumbi, SC Mhate
Bk, Ganje Dr. A.S. Patil 06/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
District Satara - THO
PHC Bamnoli, SC Tetali Dr. A.S. Patil 12/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) Block Facilator Not
properly visit to fild For
Montoring ASHA
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
PHC Saigaon, SC Dare
Bk, Karandi Dr. A.S. Patil 20/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Kusumbi, SC Nizare Dr. A.S. Patil 17/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Kelghar, SC
Varoshi, KedambeDr. A.S. Patil 14/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Kudal, SC
Humgaon, WaluthDr. A.S. Patil 12/12/2213
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1) MCTS Due services of
ANC & Child record not
maintain of Feb.17
2) There is no idea of
MCTS user name &
password to HA Male
3)At ANC camp there is no
workplan of ANC from
MCTS software
1)RKS GB&EC Meeting
are not done & not
maintain by proper norms
in 14-1 . & Physical &
financial report is not
verified by
2).Record is not maintain
at proper time & Subcenter
Record Not updated
properly 2 AMG & untied
record is maintain at proper
time 2 Subcenter Not clea
3) pending issue for RKS
Audit fee 14-17
District Satara - Accountant
PHC Kusumbi, PHC
Kelghar SC Malchoundi,
SC Bhanang, RH Medha
Smt. V.V. Karkhanis
07/12/2018
All Identified issues are
disscussed with
concerned Medical
officer & PHC clerk &
SC ANM. As per
instrructions given by us
in visit
At PHC & SC Level Yes
PHC Kudal, SC
Humgaon, WaluthDr. A.S. Patil 28/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Kusumbi, SC Mhate
Bk, Ganje Dr. A.S. Patil 21/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
PHC Saigaon, SC Dare
Bk, Karandi Dr. A.S. Patil 20/12/2018
Tell about MCTS
updation & verify JSY
private beneficiary fill up
in DHIS-2 software also
tell about to keep the
APL & BPL befeciries of
family planning in
statement A & issue the
JSY beneficiries payment
by cross cheque only.
At PHC & SC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1)RKS GB&EC Meeting
are not done& not
maintain by proper norms
in 14-1 . & Physical &
financial report is not
verified by
2).Record is not maintain
at proper time & Subcenter
Record Not updated
properly 2 AMG & untied
record is maintain at proper
time 2 Subcenter Not clea
3) pending issue for RKS
Audit fee 14-17
SC Enkul
1) MCTS Update 2)
Subcenet Delivery 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
03/12/2018 -- -- No --
PHC Pusesawali
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
12/12/2018 -- -- No --
PHC Khatav1) Record Update 2)
Cashbook Update
Dr.Y.R.Shaikh, Tho
07/12/2018 -- -- No --
PHC Ka.Khatav 1) Record Update 2)
Cashbook Update
Dr.Y.R.Shaikh, Tho
10/12/2018 -- -- No --
PHC Pusegaon
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
10/12/2018 -- -- No --
PHC Mayani
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
12/12/2018 -- -- No --
SCBombale
1) MCTS Update 2)
Subcenet Delivery 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
14/12/2018 -- -- No --
PHC Pusegaon 1) Record Update 2)
Cashbook Update
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
PHC Pusegaon
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
District Satara - THO
PHC Bamnoli, SC Tetali,
SC Munawale
Smt. V.V. Karkhanis
20/12/2018
All Identified issues are
disscussed with
concerned Medical
officer & PHC clerk &
SC ANM. As per
instrructions given by us
in visit
At PHC & SC Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Visapur
1) MCTS Update 2)
Subcenet Delivery 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
SC Lalgun
1) MCTS Update 2)
Subcenet Delivery 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
PHC Diskal
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
PHC Mayani
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
17/12/2018 -- -- No --
PHC Ka.Khatav
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
21/12/2018 -- -- No --
PHC Diskal
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
28/12/2018 -- -- No --
PHC Nimsod
1) Record Update 2)
Cashbook Update 3)
Kutumb Kalyan & Delivery
Work Prograse
Dr.Y.R.Shaikh, Tho
28/12/2018 -- -- No --
PHC Diskal ,SC Budh1) Record Update 2)
Cashbook Update
Smt. B.G. Gore, Ac.
14/12/2018
-- --
No
--
PHC Pusegaon, 1) Record Update 2)
Cashbook Update
Smt. B.G. , Ac.
GoreDr.Y.R.Shaikh, Tho
17/12/2018
-- --
No
--
PHC Ka.Khatav1) Record Update 2)
Cashbook Update
Smt. B.G. Gore, Ac
22/12/2018
-- --
No
--
RH Koregaon Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
PHC Rahimtpur Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
SDH Phaltan Inj. Morphine, Inj Fentanyl
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
PHC Barad Inj. Morphine, Inj Fentanyl
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
District Satara - Accountant
District Satara -THO
12-11-2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Mayani
Inj. Morphine, Inj Fentanyl,
Activated charcoal, Inj.
Naloxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
RH Vaduj Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
PHC Shirwal Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
RH Khandala
Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL, Inj.
Lignocaine 2%
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
RH Wai
Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL,
Inj.Hydrocortisone, Inj.
Ondansetrone, Inj.
Amiadarone (50mg/ml), Inj.
Magnesium Sulphate
25%2ml, Inj. Paracetamol
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
PHC Bhuinj Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
PHC Nagthane Tal-Satara Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
PHC Tarale Tal- Patan Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
PHC Kelghar
Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL, Inj.
Lignocaine 2%
21/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
PHC Kudal Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL22/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
SDH Karad
Inj. Adrenaline, Inj.
Morphine, Inj Fentanyl, Inj.
Nalaxone HCL, Tab Aspirin
75mg, Burn Pack
26/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
Malkapur Nagarpachayat
Malkapur
Pain Spray, Inj. Morphine,
Inj Fentanyl, Inj. Nalaxone
HCL, Tab. Isosorbide
Dinitrate 5mg
27/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
Krishna Institute Medical
Science Karad
Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL28/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
MS Level Yes
PHC Parali, Tal-Satara Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
PHC MO Level Yes
Aryangla Hospital Satara Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL
BVG DM & Supervisor
to inform availability
medicine and Equipment.
ACS Level Yes
19/12/2018
20/12/2018
29/12/2018
13/12/2018
15/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
DH Satara Inj. Morphine, Inj Fentanyl,
Inj. Nalaxone HCL31/12/2018
BVG DM & Supervisor
to inform availability
medicine and Equipment.
ACS Level Yes
Maisahe Bawdekar
Highschool Kolhapur1) MR Campaign Visit
DDHS,Dr P.P.Dharurkar
03-12-20181) MR Campaign Visit FACILITY NO FACILITY
RH-
Gaganbawda,Parwadi,RH-
Vaibhwadi,Devgad
1) JSSK Referral ,diet and
consumables
2) NRHM Expenditure
3)PHC Deliverables
4) Check The Malaria
Patient
5) MR Campaign Visit
Dr P.P.Dharurkar
04-12-2018
1) JSSK Referral ,diet
and consumables
2) NRHM Expenditure
3)PHC Deliverables
4) Check The Malaria
Patient
5) MR Campaign Visit
FACILITY NO FACILITY
DHO Office Sangli
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Circle Programe
Manager,Smt.A.V.Kudache
1-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
Circle Kolhapur- DDHS
Circle Kolhapur- CPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH-Gadhinglaj,PHC-
Halkarni
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Smt.A.V.Kudache
11-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
RH-Kagal,PHC-
Sangaon,SC-Kurnur
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Smt.A.V.Kudache
14-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC-A.Lat,RH-Shirol
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Smt.A.V.Kudache
15-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
RH-Ajara,PHC-Uttur
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Smt.A.V.Kudache
18-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH-Tasgaon,PHC-
Chichni
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on CHC Star
Ratning 16-17 & criteria
5)Instruction on
Infrastructure 17-18 For all
facility
6) RCH Portal updation OF
beneficiary,helath providers
mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
Smt.A.V.Kudache
31-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on CHC
Star Ratning 16-17 &
criteria
5)Instruction on
Infrastructure 17-18 For
all facility
6) RCH Portal updation
OF beneficiary,helath
providers mobile
number,Aadhar,Bank
Details,Adhar Seeded
7) Instruction given on
PFMS
FACILITY NO FACILITY
Z.P.Kolhapur
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating 18-
19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal registration
OF beneficiary & Update
Adhar, Bank Details.
M&E OFFICER,Smt
Pratibha Vibhute
15-12-2018
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating
18-19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal
registration OF
beneficiary & Update
Adhar, Bank Details.
FACILITY NO FACILITY
Circle Kolhapur- M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
DMER Kolhapur,
CS Office Kolhapur
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating 18-
19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal registration
OF beneficiary & Update
Adhar, Bank Details.
Smt Pratibha Vibhute
18-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating
18-19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal
registration OF
beneficiary & Update
Adhar, Bank Details.
FACILITY NO FACILITY
KMC Kolhapur
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU Operationlisation
3) Instruction given on
kayakalp baseline assesment
& internal assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating 18-
19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal registration
OF beneficiary & Update
Adhar, Bank Details.
Smt Pratibha Vibhute
20-12-18
1) Instruction Given On
PMSMA & Increase
Involment Of Private
Facility Doctor
2)Instruction Given On
L3/FRU
Operationlisation
3) Instruction given on
kayakalp baseline
assesment & internal
assesment
4)Instruction on HMIS
Portal validation error,
CHC/PHC Star Rating
18-19 & criteria,
and CHC/PHC
Beheaviour& H.R.
Infrastructure For all
facility.
5) RCH Portal
registration OF
beneficiary & Update
Adhar, Bank Details.
FACILITY NO FACILITY
Z.P.Kolhapur
.
1) NHM Relaeated
Programes
2) PPP Programmes
Mr. R. P. Sawadkar (PPP
Coordinator)
15-12-18
1)Instruction given to
authority for display the
banners of Toll free no
102, 104, 108 &
Priscription free service
provider.
2) All staff registered to
HACC (Toll free no.
104) & given
information about PPP
Programe.
3) Given Information Of
NTCP Programe
4)Given Information Of
NCD Programe
5) Check Abulance
Facility NO Facility
Circle Kolhapur- PPP Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
CS Office Kolhapur
DMER Kolhapur
.
1) NHM Relaeated
Programes
2) PPP Programmes
Mr. R. P. Sawadkar (PPP
Coordinator)
18-12-18
1)Instruction given to
authority for display the
banners of Toll free no
102, 104, 108 &
Priscription free service
provider.
2) All staff registered to
HACC (Toll free no.
104) & given
information about PPP
Programe.
3) Given Information Of
NTCP Programe
4)Given Information Of
NCD Programe
5) Check Abulance
Facility NO Facility
KMC Kolhapur
.
1) NHM Relaeated
Programes
2) PPP Programmes
Mr. R. P. Sawadkar (PPP
Coordinator)
20-12-18
1)Instruction given to
authority for display the
banners of Toll free no
102, 104, 108 &
Priscription free service
provider.
2) All staff registered to
HACC (Toll free no.
104) & given
information about PPP
Programe.
3) Given Information Of
NTCP Programe
4)Given Information Of
NCD Programe
5) Check Abulance
Facility NO Facility
RH-Malkapur,
PHC-Bambwade
.
1) NHM Relaeated
Programes
2) PPP Programmes
Mr. R. P. Sawadkar (PPP
Coordinator)
27-12-18
1)Instruction given to
authority for display the
banners of Toll free no
102, 104, 108 &
Priscription free service
provider.
2) All staff registered to
HACC (Toll free no.
104) & given
information about PPP
Programe.
3) Given Information Of
NTCP Programe
4)Given Information Of
NCD Programe
5) Check Abulance
Facility NO Facility
Chandgad
1.about counseling, register,
about reports, outreach
activity, about expenditure
of PIP
Dr Smita Khadare DPM
07/12/7018
Give Instruction
Regarding Ashapana
Work
Facility -Medical Officer- Yes -----
Gadhinglaj Record chacking Dr Smita Khandare DPM
12/12/18
Give Instruction
Regarding Account
Issues
Facility -Medical Officer- Yes -----
BhudargadFor NHm Review meeting
& Alc Record Chacking
Shree Nitin Lohar DAM
12/12/18
Give Instruction
Regarding Cash book &
Audite Guideliness
MO Yes -----
District Kolhapur- DPM
District Kolhapur- DAM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
KarvirFor NHm Review meeting
& Alc Record Chacking
Shree Nitin Lohar DAM
17/12/18
Give Instruction
Regarding Cash book &
Audite Guideliness
MO Yes -----
Panhala Record chacking Shree Nitin Lohar DAM
19/12/18
Give Instruction
Regarding Account
Issues
MO Yes -----
Hatkanagale RH Record chacking Shree Nitin Lohar DAM
24/12/18
Give Instruction
Regarding Account
Issues
MO Yes -----
Ajara Record chacking Shree Nitin Lohar DAM
261/12/18
Give Instruction
Regarding Cash book &
Audite Guideliness
MO Yes -----
GadhinglajFor NHm Review meeting
& Alc Record Chacking
Subhangi Kokate M & E
05/12/18
Give Instruction
Regarding RCH Portal &
MR Reporting
MO Yes -----
Bhudargad RCH Portal Reporting Subhangi Kokate M & E
10/12/18
Give Instruction
Regarding RCH Portal
MR Reporting
MO Yes -----
Kagal RCH Portal Reporting Subhangi Kokate M & E
13/12/18
Give Instruction
Regarding RCH Portal
MR Reporting
MO Yes -----
Panhala RCH Portal Reporting Subhangi Kokate M & E
17/12/18
Give Instruction
Regarding RCH Portal
MR Reporting
MO Yes -----
Radhnagri RCH Portal Reporting Subhangi Kokate M & E
24/12/18
Give Instruction
Regarding RCH Portal
MR Reporting Dist.
MO Yes -----
RH Ajara1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
03-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
PHC Bhadwan1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
5-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
PHC Siddhnerli1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
7-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
PHC Bhadwan1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
10-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
JH IGM 1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
12-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
PHC Kapashi1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
24-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
RH Kagal1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
26-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
District Kolhapur- M&E OFFOCER
District Kolhapur- Dist. AH Co-oridaton
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Seva Rugnalay Kasba
bawada
1.about Inspection of 108
Ambulance
Mrs. Imran jamadar Dist
AH counselor
28-12-2018
1.about 108 Ambulance
Inspection 108 MO yes -----
SDH Gadhinglaj
1.about counseling, register,
about reports, outreach
activity, about expenditure
of PIP
Mrs. Imran jamadar Dist
AH counselor
29-12-2018
counseling to adolescent
clinet, report corretion,
plannig about expnditure
MS yes -----
RH Solankur
1.about counseling, register,
about reports, outreach
activity, about expenditure
of PIP
Mrs. Imran jamadar Dist
AH counselor
31-12-2018
counseling to adolescent
clinet, report corretion,
plannig about expnditure
MS yes -----
RH Gargoti For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
03/12/2018
For IPHS MS / Incharge Sister Yes -----
Rh Kagal For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
05/12/12018
For IPHS MS / Incharge Sister Yes -----
PHC Siddhnerli For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
7/12/2018
PRC Visit MS / Incharge Sister Yes -----
GH IGM For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
10/12/12018
For IPHS MS / Incharge Sister Yes -----
RH Malkapur For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
15/12/2018
For IPHS MS / Incharge Sister Yes -----
PHC Nandani For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
17/12/12018
For IPHS MS / Incharge Sister Yes -----
PHC Gariwade For IPHS
Mrs. Mandar Binawade
IPHS Co-Cordinator
26/12/2018
For IPHS MS / Incharge Sister Yes -----
Rh Nesari For Anganwadi Tapasani
Mrs. Pradnya Sankpal
RBSK Co-Cordinator
12/12/2018
For RBSK Issues MS / Incharge Sister Yes -----
MCL Jaysingpur For Anganwadi Tapasani
Mrs. Pradnya Sankpal
RBSK Co-Cordinator
27/12/2018
For RBSK Issues MS / Incharge Sister Yes -----
Hatkanagale RH 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
2/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Jaysingpur PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
3/012/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
District Kolhapur- RBSK Co-ordinator
District Kolhapur- EMS Co-ordinator
District Kolhapur- IPHS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
N Wadi PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
5/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Mugurwadi PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
7/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
IGM Ichalkaranji 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
12/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
BorpadalePHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
12/012/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Kale PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
15/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Bhadwan PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
18/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Shiroli PHC 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
20/012/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
Hatkanagale RH 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
26/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
IGM Ichalkaranji 108 Ambulance Inspection
Mrs. Vishvanath Gurav
EMS Co-ordinator
29/12/2018
108 Ambulance
Medicines & Instrument
Checking
108 Ambulance MO Yes -----
RH Malkapur
Hospital Visit Hospital
Inspection & Physical
Performance
Dr.Kmpi Patil Civil
Surgeon
03/12/2018
Given Instruction
Regarding Misson
Indradhanushya
MS Yes -----
N Wadi PHC
PHC Visit Hospital
Inspection & Physical
Performance
Dr Yogesh Sale Civil
Surgeon
10/12/2018
Given Instruction
Regarding Hospital
Improvement
MS Yes -----
Jaysingpur PHC
PHC Visit Hospital
Inspection & Physical
Performance
Dr.Kmpi Patil Civil
Surgeon
12/12/2018
Given Instruction
Regarding Hospital
Improvement
MS Yes -----
Rh Khupire
RH Visit Hospital Visit
Hospital Inspection &
Physical Performance
Dr.Kmpi Patil Civil
Surgeon
21/12/2018
Given Instruction
Regarding Misson
Indradhanushya
MS Yes -----
RH Gaganbawada Hospital Inspection Dr.Harshala Vedak RMO
05/12/2018Hospital Checking MS Yes -----
District Kolhapur- CS
District Kolhapur- RMO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Ichalkaranji IGM Hospital Inspection Dr.Harshala Vedak RMO
08/12/12018Hospital Checking MS Yes -----
RH Radhangai Block-
RadhanagariHospital Inspection
Dr.Harshala Vedak RMO
15/12/2018Hospital Checking MS Yes -----
Jaysingpur MCL Hospital Inspection Dr.Harshala Vedak RMO
26/12/2018Hospital Checking MS Yes -----
Rh kagal Record checkingMR. Ningoji Patil. BFO
07/12/18
To Instruct to complet all
cash book & Audit
complinance
MS & OS Yes -----
RH Ajara Record checkingMR. Ningoji Patil. BFO
17/12/18
To Instruct to complet all
cash book & Audit
complinance
MS & OS Yes -----
RH Malkapur Record checkingMR. Ningoji Patil. BFO
27/12/18
To Instruct to complet all
cash book & Audit
complinance
MS & OS Yes -----
Chandgad For IPHS SpecialistDr Yogesh Sale DHO
03/12/18
Give instruction
Regarding Set up &
Guideliness of BSU
MS / Incharge Sister Yes -----
Bhudargad For NHM Review MeetingDr Yogesh Sale DHO
05/12/18MR Visit ----- Yes -----
Hatkanagale RH Kanyagat Mahaparv MeetDr Yogesh Sale DHO
12/12/18MR Visit ----- Yes -----
Jaysingpur PHC For NHM ReviewDr Yogesh Sale DHO
14/12/18MR Visit ----- Yes -----
Rh Malkapur For NHM ReviewDr Yogesh Sale DHO
17/12/18MR Visit MS Yes -----
Kagal 118 Ambulance Inspection Dr Yogesh Sale DHO
26/12/8
118 Ambulance
Medicines & Instrument
Checking
----- Yes
Radhnagari 118 Ambulance Inspection Dr Yogesh Sale DHO
29/12/8
118 Ambulance
Medicines & Instrument
Checking
118 Ambulance MO Yes -----
RH SolankurNHM Account Record
chacking
Dr Usha devi Kumbhar/ Dr
Madane ADHO
07/12/18
MR Visit MS Yes -----
MCL JaysNHM Account Record
chacking
Dr Usha devi Kumbhar/ Dr
Madane ADHO 12/12/18MR Visit MS Yes -----
RH MalkapurNHM Account Record
chacking
Dr Usha devi Kumbhar/ Dr
Madane ADHO
14/12/18
MR Visit MS Yes -----
District Kolhapur- ADHO
District Kolhapur- BFO
District Kolhapur- DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH NesariNHM Account Record
chacking
Dr Usha devi Kumbhar/ Dr
Madane ADHO
17/12/18
MR Visit MS Yes -----
PHC P ShiroliNHM Account Record
chacking
Dr Usha devi Kumbhar/Dr
Madane ADHO
27/12/18
Hospital Checking MS Yes -----
Kagal block Hospital Inspection Dr Desai DRCHO
07/12/2018MR Visit MS Yes -----
Panhala All VHNSC Records Dr Desai DRCHO
08/12/2018MR Visit MS Yes -----
Chandgad All VHNSC Records Dr Desai DRCHO
12/12/2018MR Visit MO Yes -----
Ajara For NHM ReviewDr Desai DRCHO
21/12/2018MR Visit MS Yes -----
RH PanhalaAll records and reports are
up to date and fullfilled
Dist Ayush Officer,Dr
Sonavane 12/12/2018
report submitted to
Resp. DHO sir----- yes -----
RH Gargoti All records and reports are
up to date and fullfilled Dr Sonavane 15/12/2018
report submitted to
Resp. DHO sir----- yes -----
RH DattwadAll records and reports are
up to date and fullfilled Dr Sonavane 19/12/2018
report submitted to
Resp. DHO sir----- yes -----
RH Pargaon
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Sonavane 26/12/2018report submitted to
Resp. DHO sir----- yes -----
Hatkanagale All records and reports are
up to date and fullfilled
Zilla Sahhyak Ayush
Officer, Dr Nale MO
04/12/2018
report submitted to
Resp. DHO sir----- yes -----
RH Ajara
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Nale MO 07/12/2018report submitted to
Resp. DHO sir----- yes -----
RH Ajara
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Nale MO 12/12/2018report submitted to
Resp. DHO sir----- yes -----
District Kolhapur- DRCHO
District Kolhapur- Dist.Ayush Officer
District Kolhapur- Zilla Sahhyak Ayush Officer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Pargaon
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Nale MO 15/12/2018report submitted to
Resp. DHO sir----- yes -----
SDH Gadhinglaj
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Nale MO 17/12/2018report submitted to
Resp. DHO sir----- yes -----
RH Nesari
All records and reports are
NOT up to date and
fullfilled Expiry Medicine
Found Cashbook Not
Properly maintained
Dr Nale MO 25/12/2018report submitted to
Resp. DHO sir----- yes -----
RH GargotiAll records and reports are
up to date and fullfilled Dr Nale MO 29/12/2018
report submitted to
Resp. DHO sir----- yes -----
Ajara Block PHC &SCRch & DHIS2 & MR
Review Meeting
Shri Abhay Deshpande
Additional charge of So
06/12/2018
Give Instuction to
concern Adhikari &
karmachari about RCH
& HMIS
----- Yes -----
Radhnagari PHCRch & DHIS2 MR
Review Meeting
Shri Abhay Deshpande
Additional charge of So
13/12/2018
Give Instuction to
concern Adhikari &
karmachari about RCH
& HMIS
----- Yes -----
MCL JaysingpurRch & DHIS2 MR Review
Meeting
Shri Abhay Deshpande
Additional charge of So
19/12/2018
Give Instuction to
concern Adhikari &
karmachari about RCH
& HMIS
----- Yes -----
Rh kagalRch & DHIS2 MR Review
Meeting
Shri Abhay Deshpande
Additional charge of So
27/12/2018
Give Instuction to
concern Adhikari &
karmachari about RCH
& HMIS
----- Yes -----
RVS , THO GARIVADEBBM AND PLASTER
AND OFFICE WORK
Shree Sachin Chavan DYE
12/12/2018STRUCTURAL STEEL
DESIGN,IDW LEVEL Yes -----
Saravade & Tarale PhC parking shed
Shree Sachin Chavan DYE
20/12/2018STRUCTURAL STEEL
DESIGN,IDW LEVEL Yes -----
BORPADALE, KOTOLI,
, RH MALKAPUR,
PARALI NINAI
WATER SUPPLY WORK
Shree Sachin Chavan
DYE 29/12/2018RVS , THO
GARIVADE
BBM AND PLASTER AND
OFFICE WORK
phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE
2/12/2018phc bhedasgaon, PLASTER, BBM Yes -----
District Kolhapur- Jr.Engineer
District Kolhapur- SO
District Kolhapur- Dy.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RVS BBM AND PLASTERShri Vinod Koli JE
3/12/2018RVS BBM AND PLASTER Yes -----
phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE
13/12/2018phc bhedasgaon, PLASTER, BBM
phc bhedasgaon, COLOURShri Vinod Koli JE
14/12/2018phc bhedasgaon, PLASTER, BBM Yes -----
RVS BBM AND PLASTERShri Vinod Koli JE
20/12/2018RVS BBM AND PLASTER Yes -----
phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE
21/12/2018phc bhedasgaon, PLASTER, BBM
phc bhedasgaon, COLOURShri Vinod Koli JE
24/12/2018phc bhedasgaon, PLASTER, BBM Yes -----
RVS , THO GARIVADEBBM AND PLASTER
AND OFFICE WORK
Shri Vinod Koli JE
29/12/2018
RVS , THO
GARIVADE
BBM AND PLASTER AND
OFFICE WORK
RVS BBMShri Vinod Koli JE
31/12/2018RVS BBM Yes -----
SAVA RUGANLYA..
K.BAWADA, RH
KAGAL
Site visit A. M. Madiwal . Jounior
Enggineer 1/12/2018PLASTERING WORK IDW LEVEL Yes -----
THO SHIROL, RH
SHIROL
OFFICE WORK,SITE
VISIT
A. M. Madiwal . Jounior
Enggineer 3/12/2018RH OBSERVATION IDW LEVEL Yes -----
PHC CHIKALI Site visit A. M. Madiwal . Jounior
Enggineer 4/12/2018
13 th finance L.R.
UpgradationIDW LEVEL Yes -----
SAVA RUGANLYA..
K.BAWADA, PHC
SAWARDE
Site visit A. M. Madiwal . Jounior
Enggineer 5/12/2018 ,PHC OBSERVATION IDW LEVEL Yes -----
PHC
P.KODOLI,NADANISite visit
A. M. Madiwal . Jounior
Enggineer 7/12/2018 ,PHC OBSERVATION IDW LEVEL Yes -----
SAVA RUGANLYA..
K.BAWADA,PHC hupariSite visit
A. M. Madiwal . Jounior
Enggineer 12/12/2018
SITE VISIT Fabrication
work ,PHC
OBSERVATION
IDW LEVEL Yes -----
SAVA RUGANLYA..
K.BAWADA,Site visit
A. M. Madiwal . Jounior
Enggineer 13/12/2018PLASTERING WORK IDW LEVEL Yes -----
District Kolhapur- Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SAVA RUGANLYA..
K.BAWADA PHC A.LAT,Site visit
A. M. Madiwal . Jounior
Enggineer 17/12/2018PLASTERING WORK IDW LEVEL Yes -----
SAVA RUGANLYA..
K.BAWADA,Site visit
A. M. Madiwal . Jounior
Enggineer 21/12/2018PLASTERING WORK IDW LEVEL Yes -----
THO SHIROL, RH
SHIROL
OFFICE WORK,SITE
VISIT
A. M. Madiwal . Jounior
Enggineer24/12/2018RH OBSERVATION
SAVA RUGANLYA..
K.BAWADA PHC
DANOLI,
Site visit A. M. Madiwal . Jounior
Enggineer 26/12/2018
SITE VISIT Fabrication
work ,PHC
OBSERVATION
IGM Site visit A. M. Madiwal . Jounior
Enggineer 31/12/2018
13th finance L.R.
UpgradationIDW LEVEL Yes -----
PHC MALIGRE TAL
AAJRASite visit
MANJEET PATIL .
Jounior Enggineer
3/12/2018
Site visit IDW LEVEL Yes
PHC NOOL TAL
GADHINGLAJSite visit
MANJEET PATIL .
Jounior Enggineer
4/12/2018
Site visit IDW LEVEL Yes -----
SHENDA PARK & HEAD
OFFICESite visit
MANJEET PATIL .
Jounior Enggineer
13/12/2018
Site visit IDW LEVEL Yes -----
PHC MAHAGOAN TAL
GADHINGLAJSite visit
MANJEET PATIL .
Jounior Enggineer
19/12/2018
Site visit IDW LEVEL Yes -----
PHC-Nandani,
Block-Shirol
For RKS record cheking
and VHNSC Asha member
secretary discussion
Mrs. Pallavi S. Nakate,
RKS Co.ordinator Kolhapur
11/12/2018
Instruct to complete the
points which are
observed in record
cheking
DISTRICT YES PHC Level
RH- Khupire, Block-
KarveerFor RKS record cheking
Mrs. Pallavi S. Nakate,
12/12/2018
Instruct to complete the
points which are
observed in record
cheking
DISTRICT YES RH LEVEL
PHC-Pulachi Shiroli,
Block-Shirol
For RKS record cheking
and VHNSC Asha member
secretary discussion
Mrs. Pallavi S. Nakate,
13/12/2018
Instruct to complete the
points which are
observed in record
cheking
DISTRICT YES RH LEVEL
District Kolhapur- Jr.Engineer
District Kolhapur- RKS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Office Shahuwadi
Guided to ASHA and
Anganwadi Sevika in
metting, BF record
checking
Mrs. Pallavi S.
Nakate, RKS Co.ordinator
Kolhapur 15/12/2018
Instructions given to
BCM and BF regarding
field visit and record
updation
Facility -BCM Yes PHC Level
PHC Amba, Block
Shahuwadi
Guided to ASHA and
Anganwadi Sevika in
metting, BF record
checking, HBNC
beneficiary visit
Mrs. Pallavi S. Nakate,
RKS Co.ordinator Kolhapur
29/12/2018
Instructions given to
BCM and BF regarding
field visit and record
updation
Facility -BCM Yes PHC Level
PHC NandaniBF record checking and
HBNC beneficiary visit
N.E. Khan
District Community
Mobiliser kolhapur
11/12/2018
Instructions given to
BCM and BF regarding
field visit and record
updation
Facility - BCM Yes -----
PHC BhadoleBF record checking and
HBNC beneficiary visit
N.E. Khan
District Community
Mobiliser kolhapur
13/12/2018
Instructions given to BF
regarding field visit and
record updation
Facility -BCM Yes -----
Block Shahuwadi
Guided to ASHA and
Anganwadi Sevika in
metting, BF record
checking
N.E. Khan
District Community
Mobiliser kolhapur
15/12/2018
Instructions given to
BCM and BF regarding
field visit and record
updation
Facility -BCM Yes -----
PHC Amba
Guided to ASHA and
Anganwadi Sevika in
metting, BF record
checking, HBNC
beneficiary visit
N.E. Khan
District Community
Mobiliser
kolhapur29/12/2018
Instructions given to
BCM and BF regarding
field visit and record
updation
Facility -BCM Yes -----
Phc
watangi,shirsangi,dhabhil
All record checking all
Financial Record of PHC
AJARA THO,Dr.R.K.Khot
12/12/2018All record of
Immunization MO Level Yes Facility
Phc bhadwan,khed,pernoliAll record checking all
Financial Record of PHC Dr.R.k.Khot18/12/2018
All record of
Immunization MO Level Yes Facility
Phc utturAll record checking all
Financial Record of PHC Dr.R.k.Khot 21/11/2019
All record of
Immunization MO Level Yes Facility
PhcMaligre,suleAll record checking all
Financial Record of PHC
AJARA
ACCOUNTANT,Kusum
Suresh Chavan 18/12/2018
1) Cash book is up to
date.2) All record done
by Me
ANM Level Yes Facility
PHC bhadwani,salgaonAll record checking all
Financial Record of PHC
Kusum Suresh
Chavan27/12/2018
1) Cash book is up to
date.2) All record done
by Me
ANM Level Yes Facility
phc Pimpalgoan All record checking all
Financial Record of PHC
Dr.R.R.Shetye
,BHDARGAD THO
3/12/18
RKS meeting Clerk Level Yes Facility
District Kolhapur- Accountant
District Kolhapur- THO Bhdargad
District Kolhapur- DCM
District Kolhapur- THO Ajara
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Minche KhAll record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 5/12/2018
1) Cash book is up to
date.2) All record
Complete to complit
Audit record
Clerk Level Yes Facility
phc Pimpalgoan All record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 8/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
phc Kadgaon All record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 12/12/18
1) Cash book is up to
date.2) All record
Complete to complit
Audit record
Clerk Level Yes Facility
PHC PatgaonAll record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 17/12/2018
1) Cash book is up to
date.2) All record
Complete to complit
Audit record
Clerk Level Yes Facility
PHC Madilge buAll record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 19/12/2018
RKS Record incomplit
and Audit para for Rks
statutary audit pendig
Clerk Level Yes Facility
phc Pimpalgoan All record checking all
Financial Record of PHC
Dr.R.R.Shetye
THO 24/12/2018
1) Cash book is up to
date.2) All record
Complete to complit
Audit record
Clerk Level Yes Facility
SC pimpalganAll record checking all
Financial Record of SC
Dr.R.R.Shetye
THO 28/12/2018
1) Cash book is up to
date.2) All record
Complete to complit
Audit record
Clerk Level Yes Facility
PHC Patgaon KhAll record checking all
Financial Record of SC
Dr.R.R.Shetye
THO 29/12/18
Review of PMSMA
registger EDD and EPD
register taken as there
were lot of mistakes in
both registers MO and
LHV both given
instructions how to keep
record of both registers.
OPD cash book of clerk
verified found correct. E
aushadhi cross verified
with medicine stock book
found corect.
MO level Yes Facility
phc Kadgaon All record checking all
Financial Record of PHC
S B Gharal Block
Accountant 4/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
PHC PatgaonAll record checking all
Financial Record of PHC
S B Gharal Block
Accountant 6/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
District Kolhapur- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC SheloliAll record checking all
Financial Record of SC
S B Gharal Block
Accountant 7/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
PHC PimpalgoanAll record checking all
Financial Record of PHC
S B Gharal Block
Accountant 10/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
PHC PatgaonAll record checking all
Financial Record of PHC
S B Gharal Accountat
20/12/18
1) Cash book is up to
date.2) All record
Complete
ANM Level Yes Facility
PHC PimpalgoanAll record checking all
Financial Record of PHC
S B Gharal Accountat
21/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
PHC MinchekhAll record checking all
Financial Record of PHC
S B Gharal Accountat
27/12/18
1) Cash book is up to
date.2) All record
Complete
Clerk Level Yes Facility
PHC Patgaon KhAll record checking all
Financial Record of SC
Dr.R.R.Shetye
THO 29/12/18
Review of PMSMA
registger EDD and EPD
register taken as there
were lot of mistakes in
both registers MO and
LHV both given
instructions how to keep
record of both registers.
OPD cash book of clerk
verified found correct. E
aushadhi cross verified
with medicine stock book
found corect.
MO level Yes Facility
PHC - tudiye
1.Cash Book is NOT
completed NOV & DEC -
18
2. VOUCHAR IS NOT
COMPLETED NOV &
DEC -18
3.BRS NOT completed
NOV -18
Mr.B.A.Sutar
Block Accountant -
11.12.2018
1) Cash book is NOT
up to date.2) All record
isNOT up date
Clerk Level Yes -----
PHC -MANGAON
1.Cash Book is NOT
completed Nov & dec -18
2.VOUCHAR IS NOT
COMPLETED Nov & Dec -
18
3.BRS NOT completed oct
& nov -18
4.nhm exp not done
Mr.B.A.Sutar
Block Accountant -
14.12.2018
1) Cash book is not up to
date.2) All record is not
up date
Clerk Level Yes -----
District Kolhapur- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC -kanur
1.Cash Book is NOT
completed nov & dec -18
2.VOUCHAR IS NOT
COMPLETED nov -18
3.BRS NOT completed nov
-18
Mr.B.A.Sutar
Block Accountant -
18.12.2018
1) Cash book is not up to
date.2) All record is not
up date
Clerk Level Yes -----
phc -here
1.Cash Book is NOT
completed oct & Nov -18
2.VOUCHAR IS NOT
COMPLETED oct & nov -
18
3.BRS NOT completed oct
& nov -18
Mr.B.A.Sutar
Block Accountant -
28.12.2018
1) Cash book is not up to
date.2) All record is not
up date
Clerk Level Yes -----
phc- ADKUR
1.Cash Book is NOT
completed Nov & dec -18
2.VOUCHAR IS NOT
COMPLETED Nov & dec -
18
3.BRS NOT completed
Nov -18
Mr.B.A.Sutar
Block Accountat
27.12.2018
1) Cash book is not up to
date.2) All record is not
up date
Clerk Level Yes -----
phc- kowad
1.Cash Book is NOT
completed Nov & Dec -18
2.VOUCHAR IS NOT
COMPLETED Nov & dec -
18
3.BRS NOT completed
Nov -18
Mr.B.A.Sutar
Block Accountant -
28.12.2018
1) Cash book is not up to
date.2) All record is not
up date
Clerk Level Yes -----
1 PHC - Gariwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
THO
Gaganbawada Additional
Charge of M.O. PHC -
Garivade 3/12/2018
THO
Gaganbawada Additional
Charge of M.O. PHC -
Garivade 3/12/2018
Facility - by THO Office Staff &
CDPO.Yes -----
1 PHC - Niwade
PHC NIWADE - Record
Checking & NRHM &
RKS
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/5/2018
Vesarde - 1)
Imunaisation setion Visit
2) Review All Software
Adava with ANM,
MPW
Facility - by THO Office Staff &
CDPO.Yes -----
District Kolhapur- THO Gaganbawada
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1 PHC - Gariwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/12/2018
THO Work - 1) THO
Office Work & Sign. 2)
All letters read & inst. To
EOH for proper Action.
4) NRHM Financial all
Head Adava & Expences
adava with Block
Accountant . 4) RKS &
VHNSC Exp. Adava
with Accountant &
CDPO.
Facility - by THO Office Staff &
CDPO.Yes -----
DAM KolhapurKoLHAPUR TALLY
Software information
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/12/2018
PHC Niwade - 1) PHC
OPD/IPD Adava Taken
with MO & LHV 2)
RCH Software &
Register Adava taken of
MO & LHV - instructed.
4) RKS & NRHM all
Headwise Adava taken &
planed for Exp. 5) All
Financial Signatures fo
NRHM & Rugular Made
& Recird Updated.
Facility - by THO Office Staff &
CDPO.Yes -----
1 PHC - Niwade
PHC NIWADE - Record
Checking & NRHM &
RKS
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/15/2018
PHC Niwade - 1) PHC
OPD/IPD Adava Taken
with MO & LHV 2)
RCH Software &
Register Adava taken of
MO & LHV - instructed.
4) RKS & NRHM all
Headwise Adava taken &
planed for Exp. 5) All
Financial Signatures fo
NRHM & Rugular Made
& Recird Updated.
Facility - by THO Office Staff &
CDPO.Yes -----
1 PHC - Gariwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/15/2018
THO Work - 1) THO
Office Work & Sign. 2)
All letters read & inst. To
EOH for proper Action.
4) NRHM Financial all
Head Adava & Expences
adava with Block
Accountant . 4) RKS &
VHNSC Exp. Adava
with Accountant &
CDPO.
Facility - by THO Office Staff &
CDPO.Yes -----
2 SC - Asansodi &
Mandukali
Record Checking & UF
& AMG
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/21/2018
Attended PCPNDT &
Bogas Dr - Taluka
Workshop @ G. Bawada -
Gidence & Training
given to All Staff .
Facility - by THO Office Staff &
CDPO.Yes -----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1 PHC - Gariwade &
Baveli
PHC GARIWADE -
Record Checking & NRHM
& RKS
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC -
Garivade12/212/2018
THO Work - 1) THO
Office Work & Sign. 2)
All letters read & inst. To
EOH for proper Action.
4) NRHM Financial all
Head Adava & Expences
adava with Block
Accountant . 4) RKS &
VHNSC Exp. Adava
with Accountant &
CDPO.
Facility - by THO Office Staff &
CDPO.Yes -----
DTT kolhapurKOLHAPUR
Monthly Meeting
12 -
THO Gaganbawada
Additional Charge of M.O.
PHC - Garivade12/30/2018
PHC Niwade - 1) PHC
OPD/IPD Adava Taken
with MO & LHV 2)
RCH Software &
Register Adava taken of
MO & LHV - instructed.
4) RKS & NRHM all
Headwise Adava taken &
planed for Exp. 5) All
Financial Signatures fo
NRHM & Rugular Made
& Recird Updated.
Facility - by THO Office Staff &
CDPO.Yes -----
PHC Gariwade - 1) PHC
OA210:H216PD/IPD
Adava Taken. 2) RCH
Software & Register
Adava. 4) RKS & NRHM
Grants Exp. Adava.
PHC Gariwade - 1) PHC
OPD/IPD Adava Taken.
2) RCH Software &
Register Adava. 4) RKS &
NRHM Grants Exp. Adava.
Dr. Shobha Suryanshi -
THO 1212/12/12018
PHC Gariwade - 1) PHC
OPD/IPD Adava Taken
with MO & LHV 2)
RCH Software &
Register Adava taken of
MO & LHV - instructed.
4) RKS & NRHM all
Headwise Adava taken &
planed for Exp.
Facility - by THO Office Staff &
CDPO.Yes -----
1 PHC - Niwade
PHC NIWADE - Record
Checking & NRHM &
RKS
THO
Gaganbawada Additional
Charge of M.O. PHC -
Garivade 5/12/2018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
1 PHC - Gariwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
THO
Gaganbawada Additional
Charge of M.O. PHC -
Garivade 12/12/2018
Record Checking &
MCTS Updation
Instruction Given for Quality
Servises to Patients & Record CheckYes -----
DAM KolhapurKoLHAPUR TALLY
Software information
Additional Charge of THO
Gaganbawada to M.O. PHC
- Garivade 14/12/12018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
1 PHC - Niwade
PHC NIWADE - Record
Checking & NRHM &
RKS
Additional Charge of THO
Gaganbawada to M.O. PHC
- Garivade 18/12/2018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
District Kolhapur- THO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1 PHC - Gariwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
Additional Charge of THO
Gaganbawada to M.O. PHC
- Garivade 20/12/2018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
2 SC - Asansodi &
Mandukali
Record Checking & UF
& AMG
Additional Charge of THO
Gaganbawada to M.O. PHC
- Garivade 24/12/2018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
1 PHC - Gariwade &
Baveli
PHC GARIWADE -
Record Checking & NRHM
& RKS
Additional Charge of THO
Gaganbawada to M.O. PHC
- Garivade 29/12/2018
Record Checking &
MCTS Updation & Also
Kayapalat Adava
Instruction Given for Quality
Servises to Patients & Record
Check. Kayapalat Adava &
Instructions given to ANM
Yes -----
1 PHC - Gariwade SC Kirve & Asandoli -
Record Checking & NRHM
Shri Deepak Kambale Acc
12/3/2018
PHC GARIWADE -
Record Checking &
NRHM & RKS
PHC GARIWADE - Record
Checking & NRHM & RKS Yes -----
1 PHC - Niwade PRC - NRHM RecordShri Deepak Kambale Acc
12/4/2018
PHC NIWADE -
Record Checking &
NRHM & RKS
PHC NIWADE - Record Checking
& NRHM & RKS Yes -----
2 PHC - Niwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
Shri Deepak Kambale Acc
12/6/2018
PHC NIWADE -
Record Checking &
NRHM & RKS
PHC NIWADE - Record Checking
& NRHM & RKS Yes -----
DTT KolhapurKOLHAPUR THO &
PHC Audit
Shri Deepak Kambale Acc
12/10/2018
KOLHAPUR - PFMS
Software Update
KOLHAPUR - PFMS Software
UpdateYes -----
SC Asandoli & Mandur2 SC - Record Checking &
NRHM
Shri Deepak Kambale Acc
12/18/2018
SC - Record Checking &
NRHM SC - Record Checking & NRHM Yes -----
DTT Kolhapur
PHC NIWADE - Record
Checking & NRHM &
RKS Meeting Planing
Shri Deepak Kambale Acc
12/21/2018
KOLHAPUR -
Meedting KOLHAPUR - Meedting Yes -----
1 PHC - Niwade
PHC GARIWADE -
Record Checking & NRHM
& RKS
Shri Deepak Kambale Acc
12/24/2018
PHC NIWADE -
Record Checking &
NRHM & RKS
PHC NIWADE - Record Checking
& NRHM & RKS Yes -----
Umbarwadi MR campaign visit
THO GADHIGLAJ, DR M
V ATHANI THO
01/12/2018THO
GADHIGLAJ,
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes -----
District Kolhapur- Accountant
District Kolhapur- THO GADHIGLAJ
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Badyachiwadi, Mutnal,
ChanekuppiMR campaign visit
DR M V ATHANI THO
03/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes -----
Mahagaon, Harli KH.,
Hebbal Jal, HadalageMR campaign visit
DR M V ATHANI THO
04/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes -----
Tavrewadi, Bhadgaon,
Harali BK, Sambre,
Nesari
MR campaign visit DR M V ATHANI THO
05/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes -----
Teginhal, Terani,
KavalikattiMR campaign visit
DR M V ATHANI THO
06/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Hunginhal, Nesari,
Narewadi, HasurwadiMR campaign visit
DR M V ATHANI THO
10/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Nesari, Hebbal Jaldyal MR campaign visit DR M V ATHANI THO
11/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Hadalge, Sambre MR campaign visit DR M V ATHANI THO
12/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Chikhali, Kagal Kayakalp VisitDR M V ATHANI THO
13/12/2018
Kayakalp Visit to chikali
PHC regarding
inspection
THO, MO Yes
Vagharali, Bidrewadi,
Helewadi, ShippurMR campaign visit
DR M V ATHANI THO
14/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Mutnal, dundage MR campaign visit DR M V ATHANI THO
15/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Basarge, Yenechvandi MR campaign visit DR M V ATHANI THO
17/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Nesari MR campaign visit DR M V ATHANI THO
18/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Bhadgaon MR campaign visit DR M V ATHANI THO
19/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Mungurwadi, Halkarni MI & Mi Inspection DR M V ATHANI THO
24/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Mahagaon. Hiddugi MI & Mi Inspection DR M V ATHANI THO
26/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Nesari MI & Mi Inspection DR M V ATHANI THO
27/12/2018
Given instruction about
AEFI
Given instruction about
100 % vaccinication
Given instruction about
ill children
ANM & Medical Officer Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Mungurwadi,
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
11/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Kanadewadi
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
11/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Mahagaon
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
12/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
District Kolhapur- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kadgaon
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
12/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Halkarni,
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
19/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
SC Narewadi
1.Cash book is completed
2.Stock book is incompleted
3.SC Balkatikaran
committee meeting not
arranged as per norms
4. Proceding is incomplete
5. Open all JSY
benificiaries accounts
Mr S V desai
Block Accountant
19/12/2018
1) Given Instruction to
ANM to complete all the
record and arrange sc
balkatikaran committee
meeting as per norms
2) Given Instruction
about 100 % Expenditure
3. Given instruction
about Jsy Benefit from
THO office since 1 Sept
through CPSMS/PFMS
4. Given guidelines to
VHNSC Expenditure
5. SC UF AMG amount
is released do needful
action.
PHC Clerk & Medical Officer Yes -----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Mungurwadi
1. Cash Book is
incompleted till date.
2. Procedding book is
incomplete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
26/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Mahagaon
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Mr S V desai
Block Accountant
26/12/2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Pulachi shiroli
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
THO HATKANGALE
,Dr S Kore THO 17-12-
2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
District Kolhapur- THO Hatkagale
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Sajani
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Dr S Kore THO 19-12-
2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Sawarde
1.Cash book is completed
2.Stock book is incompleted
3.SC Balkatikaran
committee meeting not
arranged as per norms
4. Proceding is incomplete
5. Open all JSY
benificiaries accounts
Dr S Kore THO 24-12-
2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC Ambap
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Dr S Kore THO 26-12-
2018
1) Given Instruction to
ANM to complete all the
record and arrange sc
balkatikaran committee
meeting as per norms
2) Given Instruction
about 100 % Expenditure
3. Given instruction
about Jsy Benefit from
THO office since 1 Sept
through CPSMS/PFMS
4. Given guidelines to
VHNSC Expenditure
5. SC UF AMG amount
is released do needful
action.
PHC Clerk & Medical Officer Yes -----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Alate
1. Cash Book is completed
till date.
2. Procedding book is
complete
3. Stock book & other
record completed
4. RKS Meeting Not
arranged
5. Concurent Audit para
compliance not done
6. open all Jsy Labharthi
account as soon as possible
7. Plan for 100%
expenditure
Dr S Kore THO 29-12-
2018
1. All incomplete record
is completed by me
through given
insturuction
2. Discus with MO and
Clerk for arranging EC
RKS meeting
3. Given instruction
regarding 100 %
expenditure
4. prapre paln for
expenditure
5. Given instruction to
comply all audit paras
6. Given guidelines to
VHNSC Expenditure
PHC Clerk & Medical Officer Yes -----
PHC SIDHNERLI
1)M O & Clerk Joint A/c
not Opended 2) NRHM &
RKS cash book incompleted
4) F P & JSY Payment not
done 4) Concurrent Audit
not done
THO KAGAL,DR Khot
THO 08/12/7018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
also complte RKS Audit
Facility -PHC Clerk & Medical
OfficerYes ----
PHC CHIKHALI
1) NRHM & RKS cash
book incompleted 3) F P &
JSY Payment not done
3)Audit Compliance not
done
DR Khot ,THO
Dt.24/12/18
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
Facility -PHC Clerk & Medical
OfficerYes ----
S C BELEWALE KH.
1) Cash book incomplted 2)
BRS Not Made 4) Vouchers
not filling properly
DR Khot THO 29/12/70181) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
Facility -PHC Clerk & Medical
OfficerYes ----
PHC SIDHNERLI
1)M O & Clerk Joint A/c
not Opended 2) NRHM &
RKS cash book incompleted
3) F P & JSY Payment not
done
Mr. S H GOSAVI, Block
Accountant Dt.07-12-18
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
also complte RKS Audit
Facility -PHC Clerk & Medical
OfficerYes ----
PHC PIMPALGAON
1)M O & Clerk Joint A/c
not Opended 2) NRHM &
RKS cash book incompleted
3) F P & JSY Payment not
done
Mr. S H GOSAVI, Block
Accountant Dt.12-12-18
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
Facility -PHC Clerk & Medical
OfficerYes ----
District Kolhapur- THO Kagal
District Kolhapur- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC CHIKHALI
1) NRHM & RKS cash
book incompleted 3) F P &
JSY Payment not done
3)Audit Compliance not
done
Mr. S H GOSAVI, Block
Accountant Dt.25-12-18
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
Facility -PHC Clerk & Medical
OfficerYes ----
S C SONGAE
1) Cash book incomplted 2)
BRS Not Made 3) Vouchers
not filling properly
Mr. S H GOSAVI, Block
Accountant Dt.29-12-18
1) Instructions given for
Complte the cash book,
update Voucher file , &
BRS made
Facility - SC ANM Yes ----
Hasur du FP performance is poorTHO KARVEER,Dr
Nalawade THO 1/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
Bhuye Delivery and RCH portal
performance is poor.
Dr Nalawade THO
4/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending
payment, Expenditure
made 100% againgst
received grant
Improve the PHC Delivery Yes ----
Ispurli Delivery and RCH portal
performance is poor.
Dr Nalawade THO
5/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
MudshingiFP,Delivery and RCH portal
performance is poor
Dr Nalawade THO
6/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending
payment, Expenditure
made 100% againgst
received grant
Improve the PHC Delivery Yes ----
District Kolhapur- THO Karveer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
KaneriFP and RCH portal
performance is poor.
Dr Nalawade THO
7/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
UnchgaonFP and Delivery
performance is poor.
Dr Nalawade THO
15/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending
payment, Expenditure
made 100% againgst
received grant
Improve the PHC Delivery Yes ----
VadangeFP and Delivery
performance is poor.
Dr Nalawade THO
18/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
SangrulFP and Delivery
performance is poor.
Dr Nalawade THO
19/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
Shiroli duFP and Delivery
performance is poor.
Dr Nalawade THO
20/12/2018
1) Instructions given for
Joint A/c Open & for
Complete the Cash
Books & complete the
FP, JSY Pending paymet
and also complete
Concurrent Audit,
Expenditure made 100%
againgst received grant
Improve the PHC Delivery Yes ----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kale
1.All NHM record is
completed till date
2 RKS GB MEETING
Mr. D.M.Vategave ,
THO PANHALA Block
Accountant -
04/12/2018
1.All record is completed
by me (Block Accountat)
with the help M O till
date
2.RKS GB MEETING
Facility - Medical Officer Yes ----
PHC KEKHALE
1. NHM record is
incommpleted till date
2 RKS GB MEETING
Mr. D.M.Vategave
Block Accountant -
15/12/2018
1.Instruct M O and Jr
Clerk to complete all
record time to time with
help of other staff and
block accountant
2.RKS GB MEETING
Facility - Medical Officer Yes ----
PHC BORPADALE
1.CASH BOOK NOT
UPDATED IN 2018-19
2-JSY FP DBT PAYMENT
NOT YET IN 2018-19
3.PROCEDING OF FIRST
EC AND GB MEETING IS
INCOMPLETE
Mr. D.M.Vategave
Block Accountant -
21/12/2018
1.Instruct M O and Jr
Clerk to complete all
record time to time with
help of other staff and
block accountant
Facility - Medical Officer Yes ----
SC ARALEALL NHM RECORD
INCOMPLETE
Mr. D.M.Vategave
Block Accountant -
26/12/2018
1.Instruct ANM to
complete all record time
to time with help of block
accountant
Facility - ANM Yes ----
PHC BORPADALE
1. NHM Cash book not
updated from sep 18
2.procedding of ec meeting
incomplete
3-Audit compliance pending
for 18-19 Q1 Q2 and 17-18
statutory audit
Mr. D.M.Vategave
Block Accountant -
1212/2018 26/12/2018
instruct Jr clerk to to
complete all record time
to time with help of block
accountant and made
compliance of all
pending audit paras
Facility - Medical Officer Yes ----
PHC KEKHALE
1.All NHM record is
completed till date
2-Audit compliance pending
for 18-19 Q1 Q2 and 17-18
statutory audit
Mr. D.M.Vategave
Block Accountant -
13/12/2018
instruct Jr clerk to to
complete all record time
to time with help of block
accountant and made
compliance of all
pending audit paras
Facility - Medical Officer Yes ----
PHC PADAL
1. NHM Cash book not
updated from sep 18
2.procedding of ec meeting
incomplete
3-Audit compliance pending
for 18-19 Q1 Q2 and 17-18
statutory audit
Mr. D.M.Vategave
Block Accountant -
15/12/2018
instruct Jr clerk to to
complete all record time
to time with help of block
accountant and made
compliance of all
pending audit paras
Facility - Medical Officer Yes ----
District Kolhapur- THO Panhala
District Kolhapur- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC BAJAR BHOGAON
1. NHM Cash book not
updated from sep 18
2.procedding of ec meeting
incomplete
3-Audit compliance pending
for 18-19 Q1 Q2 and 17-18
statutory audit
Mr. D.M.Vategave
Block Accountant -
19/12/2018
instruct Jr clerk to to
complete all record time
to time with help of block
accountant and made
compliance of all
pending audit paras
Facility - Medical Officer Yes ----
PHC PADAL
1.All NHM record is
completed till date
2.procedding of ec meeting
incomplete
3-Audit compliance pending
for 17-18 Q4
Mr. D.M.Vategave
Block Accountant -
26/12/2018
instruct Jr clerk to to
complete all record time
to time with help of block
accountant
Facility - Medical Officer Yes ----
PHC Tarale
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye THO
RADHNAGARI
01/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW at
facility level
3. Given instruction to
complete target of all
programmes
4. Given instruction to
improve RNTCP work
5. given instruction about
FP Camp
Taluka Health Officer Yes -----
PHC Rashiwade Phc
Thikpurli
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 04/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW at
facility level
3. Given instruction to
complete target of all
programmes
4. Given instruction to
improve RNTCP work
Taluka Health Officer Yes -----
District Kolhapur- THO Radhagari
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Sarwade sc Aini
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO5/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC Walwa Sc Turambe
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 6/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC Dhamod SC kote
Konoli
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 11/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC Rashiwade Phc
Thikpurli
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 13/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Tarale SC Gudal
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 15/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC Dhamod SC Dhamod
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 18/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC sarwade sc
Narthvade
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 20/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC Tarale
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 22/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Walwa Mangoli
1. Taking review of all
programs
2. MCTS updation is good.
3. RNTCP work is not as
per target
4. Delivery point not
achieved
Dr.R.R.Shetye
THO 27/12/2018
1. Given instruction
about maintain
cleaniness & MCTS
update 2.
Given instruction about
display mobiles No of
MO, ANM, MPW
3. Given instruction to
complete target of all
programmes
4. Give JSY benefit
within seven days
5. To do 100 %
immunization
Taluka Health Officer Yes -----
PHC DhamodALL Contractual staff
payment made.Accountant12/12/2018
ALL Contractual staff
payment made.NA NA NA
PHC ThikpurliALL Contractual staff
payment made.Accountant 15/12/2018
ALL Contractual staff
payment made.NA NA NA
PHC Rashiwade Phc
Thikpurli
ALL Contractual staff
payment made.Accountant19/12/2018
ALL Contractual staff
payment made.NA NA NA
PHC TaraleALL Contractual staff
payment made.Accountant26/12/2018
ALL Contractual staff
payment made.NA NA NA
PHC KARANJFEN,
MANJARE, MOSAM
1.Instruction givan
maintain cleaniness
2.NRHM record is
incomplete. 3.MR Visit
Dr H R NIRANKARI
Sahuwadi THO
04/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,LHVYes -----
SC SAVARDE DHU.
1.Instruction givan
maintain cleaniness 2.RI
Visit 3.EC Meeting PHC
bhedasagaon
Dr H R NIRANKARI
THO 05/12/2018
instructions given for
more updation of all
records
Facility -MPW,ANM,ASHA Yes -----
PHC MANJARE
1.Instruction givan
maintain cleaniness
2.NRHM record is
incomplete.3.GC Meeting
Dr H R NIRANKARI
THO 19/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,LHV ClerkYes -----
PHC BAMBVADE
1.Instruction givan
maintain cleaniness
2.NRHM record is
incomplete. 3.MR Visit
Dr H R NIRANKARI
THO 24/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,ClerkYes -----
PHC BAMBVADE
1.Instruction givan
maintain cleaniness 2.RI
Visit 3.EC Meeting PHC
bhedasagaon
Dr H R NIRANKARI
THO 26/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,Clerk,LHV,ASHAYes -----
PHC SARUD
1.Instruction givan
maintain cleaniness
2.NRHM record is
incomplete. 3.MR Visit
Dr H R NIRANKARI
THO 29/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,LHVYes -----
District Kolhapur- Accountant
District Kolhapur- THO Sahuwadi
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC AMBA, P.NINAI
1.Instruction givan
maintain cleaniness
2.Health Camp.3.EC
Meeting
Dr H R NIRANKARI
THO 31/12/2018
instructions given for
more updation of all
records
Facility -Medical Officer &
SI,ANM,Clerk,LHV,ASHAYes -----
PHC BAMBAVADE,
KARANJFEN
1.Icomplete Record
2.NHM record is
Incomplete.
Mr. U.B. Desai
Block Accountant -
17/12/2018
1.All record is completed
2.Discus with PHC Clerk
& MO for incomplet
record.
Facility - SI, PHC Clerk,
Gatpravartak, Medical OfficerYes -----
PHC BAMBAVADE,
MAN
1.Icomplete Record
2.NHM record is
Incomplete.
3.Incomplete BRS
Mr. U.B. Desai
Block Accountant -
24/12/2018
1.All record is completed
2.Discus with PHC Clerk
& MO for incomplet
record.
Facility - SI, PHC Clerk,
Gatpravartak, Medical OfficerYes -----
PHC Takali
R4/ R5 Incomplete,
R 16 incomplete, IDSP - S -
Form not available. MCTS
pending due.workplan file
is not maintained properly.
DR.P.S.DATAR THO
SHIROL Accountant
12/12/7018
Instructtions issued Facility - RH Clerk, PHC HV,
Medical OfficerNO -----
PHC Nursingwadi
EDD- EPD Calender
not updated.
MCTS pending
due.workplan file is not
maintained properly.
DR.P.S.DATAR Block
Accountant 26/12/7018Instructtions issued
Facility - RH Clerk, PHC HV,
Medical OfficerNO -----
SDH Kavathe Mahankal DPM,12-07-2018 Facility Yes No
Chichani Ambak 12-09-2018 Facility Yes No
District Kolhapur- Accountant
District Kolhapur- Accountant
District Sangli- DPM
BSU,NBSU,Specialist
,HLL,Faber,
NBSU,Kayakalp,HLL.Faber
sindoori
Record Seen for
HLL,Faber
sindoori,instructions
given for HLL
services,specialist
logbook seen and
checked, Record Seen
for HLL,Faber
sindoori,instructions
given for HLL
services,NBSU record
seen and checked
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH ISLAMPUR, PHC
Sagav, Kokrud
Client satishfaction serve
not available,
BSU,NBSU,Specialist
,HLL,Faber, LaQshya
related IEC'S not available,
LaQshya related SOP'S not
available
14/12/18
formats are given advice
to maintained 3 months
before data, Record Seen
for HLL,Faber
sindoori,instructions
given for HLL
services,specialist
logbook seen and
checked, Record Seen
for HLL,Faber
sindoori,instructions
given for HLL
services,NBSU record
seen and checked, advice
to display, photos are
share, sop are prepared &
handover to facility
Facility level Yes No
THO Atpadi
THOKhanapur
All institutes are good in EC
entries but poor PW and
CH, also poor in updation of
services. DHIS-2 new
indicator are not filled in
good validation. Most of the
beneficiaries of JSY are
deprived from benefit.
23/12/2018
Given instructions
regarding RCH portal,
DHIS-2 new indicators
and taken overall review
of all RCH
indicators.Also given
instructions regarding
JSY that how to give a
benefit by withdrawing
A/c of beneficiaries by
variuos ways as per
guidelines of SHS.
Facility Yes No
K. Mahankal THO &
SDH
THO office cash book
checked. SDH cash book,
vouchers, Specialist register
checked. As per physical,
expenditure is not booked.
PFMS is not prepared.
DAM,07.12.18
Give instructions to book
all the expenditure as per
physical work. With CS
sir discussion, arrange
duties of OS, clerk.
Facility Yes No
RH Chinchaniwangi, SC
Ambak
RH cash book, vouchers,
checked. As per physical,
expenditure is not booked.
9.12.18
Give instructions to book
all the expenditure as per
physical work.
Facility Yes No
SDH Kavthe Mahankal DHIS 2.27 Data Not filledM & E Officer (Priyanka
Belwalkar),08-07-2018
Instructedc to fill data &
cover backlogFacility Yes No
Miraj THO OfficeDHIS 2.27 Private Data
Error15/12/2018 Instructions given Facility Yes No
THO Walwa PHC kurlapRCH Portal Low
Performing18/12/2018 Plan given to increase the status Facility Yes No
District Sangli- M&E OFFICER
District Sangli- DAM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Jat PHC walsangRCH Portal Low
Performing13//12/2018
Instructions given to
complete RCH register &
increase the status
Facility Yes No
SDH Kavathe MahankalBSU,NBSU,Specialist
,HLL,Faber
IPHS Co-ordinator,12-07-
2018
Record Seen for
HLL,Faber
sindoori,instructions
given for HLL
services,specialist
logbook seen and
checked
Facility Yes No
Chichani AmbakNBSU,Kayakalp,HLL.Faber
sindoori12-09-2018
Record Seen for
HLL,Faber
sindoori,instructions
given for HLL
services,NBSU record
seen and checked
Facility Yes No
observe presence of stray
animals within premises.
Advice to construct cattle
trapFacility level Yes No
Sop of all departments
related to NQAS not
available
advice to keep sop's are
made available on mailFacility level Yes No
IEC'S are not upto the mark instruct to prepare IEC's Facility level Yes No
observe presence of stray
animals within premises.
Advice to construct cattle
trapFacility level Yes No
Foul smell in toilets
instruction has to be
given to housekeeping
staff
Facility level Yes No
housekeeping checklist is
not displayed in phc
advice to display the
housekeeping checklist Facility level Yes No
LaQshya related IEC'S not
available
advice to display, photos
are share Facility level Yes No
LaQshya related SOP'S not
available
sop are prepared &
handover to facilityFacility level Yes No
Hand over register not
availableregister maintained Facility level Yes No
Client satishfaction serve
not available
formats are given advice
to maintained 3 months
before data
Facility level Yes No
SDH KAVATHEMAHANKAL 13/12/18
SDH ISLAMPUR 14/12/18
District Sangli- IPHS Co-ordinator
District Sangli- QA Co-ordinator
PHC Dighanchi DQAC,12-06-2018
PHC Mangale 12-12-2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
LaQshya related IEC'S not
available
advice to display, photos
are shareFacility level Yes No
LaQshya related SOP'S not
available
sop are prepared &
handover to facilityFacility level Yes No
PHC Sawalaj, Yelavi, SC
siddhewadi, Anjani DHO,03-12-2018 Facility Yes No
SC Suslad, Umadi, Sordi,
Sonayl 06-12-2018 Facility Yes No
PHC Mo. Wadgaon,
Kheradewang, SC Wangi,
Ramapur, Sonkire
11-12-2018 Facility Yes No
PHC Borgaon 13-12-2018 Facility Yes No
RH Kavathe Mahankal,
PHC Dhalgaon 14-12-2018 Facility Yes No
PHC Sankh, aasangiturk
RH Jath18-12-2018 Facility Yes No
RH Tasgaon, Sc Yogewadi 26-12-2018 Facility Yes No
THO Kadegaon, THO
Palus, RH Palus28-12-2018 Facility Yes No
PHC Borgaon Regarding RCH registers DRCHO,04-12-2018
Given instructions to fill
RCH registers. Solve
there queries regarding
RCh register.
Facility Yes No
RH Kavathe Mahankal,
PHC Dhalgaon Regarding RCH registers 05-12-2018
Given instructions to fill
RCH registers. Solve
there queries regarding
RCh register.
Facility Yes No
PHC Sankh, aasangiturk
RH Jath
HMIS, DHIS and review of
all RCH indicators07-12-2018
Discussed some issues
of DHIS-2 like monthly
reporting of family
planning cases, also of
pvt., Taken review of all
RCH indicator as per
target given to institutes.
Facility Yes No
District Sangli- DRCHO
SDH ISLAMPUR 14/12/18
District Sangli - DHO
Kayakalp visit Done,
Regarding RCH registers,
DHIS, and review of all
RCH indicators
points according to
Kayakalp
seen,cleaning,hand
washing
facility,BMW,infection
control,Discussed some
issues of DHIS-2 like
monthly reporting of
family planning cases,
also of pvt., Taken
review of all RCH
indicator as per target
given to institutes.,
Given instructions to fill
RCH registers. Solve
there queries regarding
RCh register.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Tasgaon, Sc Yogewadi 11-12-2018 Facility Yes No
THO Kadegaon, THO
Palus, RH Palus12-12-2018 Facility Yes No
PHC Chichani 14-12-2018 Facility Yes No
RH Vith, RH Tasgaon, 18-12-2018 Facility Yes No
Jath Jath, Valsang, Guddapur MO DHTC ,12-04-2018 Guddapur Fair Pre Visit
Miraj, K-Mahankal &
Jath
Bhose, Shirdhon, Nagaj,
Umadi, Jath12-06-2018
MR Vaccination
Campaign Visit
Jathjath, Bilur, Valsang,
Madgyal, Sankh, Dafalapur12-07-2018
MR Vaccination
Campaign Visit
JathDafalapur, Jath, Valsang,
Madgyal, Sankh12-11-2018
MR Vaccination
Campaign Visit
JathKumbhai, Shegaon,Banali,
Jath, Dafalapur 14/12/2018
MR Vaccination
Campaign Visit
Miraj, Tasgaon, VitaKavalapur, Tasgaon,
Manerajuri, Vita18/12/2018
MR Vaccination
Campaign Visit
K mahankal Nagaj, Dhalgaon 23/12/2018Hon. Chief Minister's
Programme
K- Mahankal, JathShirdhon, K.Mahankal,
Ranjani, Dafalapur26/12/2018
MR Vaccination
Campaign Visit.
PHC ARAG Checking Site Dy. Engineer ,03-12-2018giving instruction to
contractorFacility Yes No
Warehouse kavalapur Checking Site 06-12-2018giving instruction to
contractorFacility Yes No
SNCU,DEIC Sangli Checking Site 11-12-2018giving instruction to
contractorFacility Yes No
Rh Vita Checking Site 12-12-2018giving instruction to
contractorFacility Yes No
DVS Budhgaon Checking Site 13-12-2018giving instruction to
contractorFacility Yes No
PHC Kharsundi Checking Site 17-12-2018giving instruction to
contractorFacility Yes No
PHC Bhilawadi, Kundal Checking Site 19-12-2018giving instruction to
contractorFacility Yes No
SDH Islampur,RH Palus Checking Site 26-12-2018giving instruction to
contractorFacility Yes No
PHC Sagaon, Mangale Checking Site 28-12-2018giving instruction to
contractorFacility Yes No
PHC Borgaon,Yede. Checking SiteJr. Engineer(P.A.Khade),01-
12-2018
giving instruction to
contractorFacility Yes No
PHC NERLE/PETH Checking Site 04-12-2018giving instruction to
contractorFacility Yes No
PHC ANTRI,SHIRSHI Checking Site 05-12-2018giving instruction to
contractorFacility Yes No
PHC NERLE/PETH Checking Site 07-12-2018giving instruction to
contractorFacility Yes No
HMIS, DHIS, and review
of all RCH indicators
Discussed some issues
of DHIS-2 like monthly
reporting of family
planning cases, also of
pvt., Taken review of all
RCH indicator as per
target given to institutes.
Whole block is good in
all indicators.
District Sangli- MODHTC
District Sangli- Dy.Engineer
District Sangli- Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
UPHC Islampur,Rh Palus Checking Site 11-12-2018giving instruction to
contractorFacility Yes No
PHC Borgaon,Yede. Checking Site 12-12-2018giving instruction to
contractorFacility Yes No
PHC Kurlap,Yelur Checking Site 14-12-2018giving instruction to
contractorFacility Yes No
RH shirala,Mandoor Checking Site 18-12-2018giving instruction to
contractorFacility Yes No
PHC Bhilawadi, Kundal Checking Site 19-12-2018giving instruction to
contractorFacility Yes No
SDH Islampur,RH Palus Checking Site 26-12-2018giving instruction to
contractorFacility Yes No
PHC Sagaon, Mangale Checking Site 28-12-2018giving instruction to
contractorFacility Yes No
PHC ARAG Checking Site
Jr.
Engineer(P.A.Gaikwad),03-
12-2018
giving instruction to
contractorFacility Yes No
Warehouse kavalapur Checking Site 06-12-2018giving instruction to
contractorFacility Yes No
SNCU,DEIC Sangli Checking Site 11-12-2018giving instruction to
contractorFacility Yes No
PHC Dhalgaon Checking Site 13-12-2018giving instruction to
contractorFacility Yes No
PHC Khanderajuri Checking Site 14-12-2018giving instruction to
contractorFacility Yes No
Warehouse kavalapur Checking Site 18-12-2018giving instruction to
contractorFacility Yes No
SNCU,DEIC Sangli Checking Site 20-12-2018giving instruction to
contractorFacility Yes No
PHC ARAG Checking Site 21-12-2018giving instruction to
contractorFacility Yes No
SNCU,DEIC Sangli Checking Site 24-12-2018giving instruction to
contractorFacility Yes No
Warehouse kavalapur Checking Site 27-12-2018giving instruction to
contractorFacility Yes No
SNCU,DEIC Sangli Checking Site 28-12-2018giving instruction to
contractorFacility Yes No
PHC Atapdi Checking SiteJr. Engineer(V.A.Patil),01-
12-2018
giving instruction to
contractorFacility Yes No
PHC Chinchani Checking Site 03-12-2018giving instruction to
contractorFacility Yes No
PHC Karagani Checking Site 05-12-2018giving instruction to
contractorFacility Yes No
PHC manerajri Checking Site 06-12-2018giving instruction to
contractorFacility Yes No
PHC Chinchani Checking Site 10-12-2018giving instruction to
contractorFacility Yes No
Rh Vita Checking Site 12-12-2018giving instruction to
contractorFacility Yes No
DVS Budhgaon Checking Site 13-12-2018giving instruction to
contractorFacility Yes No
PHC Kharsundi Checking Site 17-12-2018giving instruction to
contractorFacility Yes No
Kolhapur Checking Site 20-12-2018giving instruction to
contractorFacility Yes No
DVS Budhgaon Checking Site 24-12-2018giving instruction to
contractorFacility Yes No
PHC Dinganchi Checking Site 26-12-2018giving instruction to
contractorFacility Yes No
PHC Atpadi, Kharsundi PHC Visit DCM ,03-12-2018 ……. Facility Yes No
PHC Khanapur, Yelavi PHC visit 05-12-2018 ……. Facility Yes No
PHC Manerajuri PHC Visit 06-12-2018 ……. Facility Yes No
PHC Agalgaon PHC visit 10-12-2018 ……. Facility Yes No
District Sangli- Jr.Engineer
District Sangli- Jr.Engineer
District Sangli- DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Dighanchi1) Less Dlivery, 2) Increase
the Jsy Work. THO Atpadi ,12-01-2018 Improvement PHC Level No PHC
SC Gharniki
1) Less Dlivery, 2) Increase
the Jsy Work. 3) Less RCH
Data Entr y4 ) Less
PMMVY work.
12-04-2018 Improvement SC Level No PHC
SC Nelkaranji
1) Less Dlivery, 2) Increase
the Jsy Work. 3) Less RCH
Data Entry 4 ) Less
PMMVY.
12-05-2018 Improvement SC Level No PHC
SC Dighanchi 1, 21) Less PMMVY work 2)
less JSY work12-06-2018 Improvement SC Level No PHC
PHCAtpadi
1) Less Dlivery, 2) Increase
the Jsy Work. 3)Less RCH
Data Entry. 4) Less Family
Planning Work. 5) Less
PMMVY Work.
12-07-2018 Improvement PHC Level No PHC
PHC Kargani
1) Less Dlivery, 2) Increase
the Jsy Work. 3)Less RCH
Data Entry. 4) Less
PMMVY Work. 5) Less
PPIUCD
12-10-2018 Improvement PHC Level No PHC
SC Shetfale
1) Less Dlivery, 2) Increase
the Jsy Work. 3) Less
PMMVY work .4) Less
RCH Data Entry.
13/12/2018 Improvement SC Level No PHC
SC Zare
1) Increase the Jsy
Work.2)Less RCH Data
Entry. 3) Less PMMVY
work
14/12/2018 Improvement SC Level No PHC
SC Nimbavade
1) Increase the Jsy Work.
3) Less PMMVY work .3)
Less RCH Data Entry.
17/12/2018 Improvement SC Level No PHC
PHC Kharsundi
1) Less Dlivery, 2)Less Jsy
Work. 3)Less PPIUCD 4)
Less RCH Data Entry. 5)
Less RKS Meetings.
20/12/2018 Improvement PHC Level No PHC
SC Tadavale
1) Less Dlivery, 2) Less Jsy
Work. 3) Less PMMVY 4)
Less Family Planning work.
21/12/2018 Improvement SC Level No PHC
District Sangli- THO Atpadi
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Daribdchi SC
1)MR Immunisation
Performance Poor
2)Diseares Survellance Poor
3) RCH Data Entry at
Preganent Women Child
Poor
THO Jath DR.D.G.Pawar
,12-05-2018
1) Take PTM for MR
Immunisation at School
2)Daily Diseares
Suruellance Must be
done 3)Daily Data Entery
at PW & Child must
Bedone
Block Yes No
Sankh PHC
1) FP work Poor 2)Jsy
Performance poor 3) MR
Immunisation at 9 Monthe
to 15 year is Poor
12-10-2018
1) Plan Tubetomy Camp
Weekly 2) Identity JSY
Beneficery Done Every
Villege 3)Plan MR
Session For Every
School
Block Yes No
Umadi PHC
1) FP work Poor 2)Jsy
Performance poor 3)
RNTCP Performance poor
14/12/2018
1) Plan Tubetomy Camp
Weekly 2) Identity JSY
Beneficery Done Every
Villege 3)Collect Sputum
4% at opd
Block Yes No
Sonyal SC
1) PMMVY Performance
poor 2)Jsy Performance
poor 3) RCH Data Entry at
PW/Child Poor
13/12/2018
1) Collect form at
Pmmvy from Sonyal
Lakadewadi 2)Identity
JSY Beneficery Done
Every Villege 3)Data
Entry Must Be done
Daily
Block Yes No
Utagi SC
1) PMMVY Performance
poor 2)RCH Data Entey At
PW/Child Poor 3) FP Work
poor
13/12/2018
1) Collect form at
Pmmvy from Sonyal
Lakadewadi 2)Data
Entry Must Be done
Daily
Block Yes No
PHC-Deshing
1) FP Vouchers are not
maintaned properly. 2)JSY
Voucher & Reg.not
maintaned properly.
Kavte Mahankal Block
Accountant (Vitthal
Mangure),15/12/2018
1)Given instruction to
Clerck & LHV to
maintaned FP Vouchers
properly. 2)Given
instruction to LHV to
maintained JSY Voucher
& Reg.Properly.
Facility Yes Facility
District Sangli- THO Jath
District Sangli- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC-Deshing
1) Cash Book not
update.2)JSY Register not
update
15/12/2018
Given instruction to
ANM to update Cash
book & JSY Register.
Facility Yes Facility
PHC- Ranjani
1) FP Vouchers are not
maintaned properly. 2)JSY
Voucher & Reg.not
maintaned properly.
19/12/2018
1)Given instruction to
Clerck & LHV to
maintaned FP Vouchers
properly. 2)Given
instruction to LHV to
maintained JSY Voucher
& Reg.Properly.
Facility Yes Facility
SC-Ranjani
1) Cash Book not
update.2)JSY Register not
update.
19/12/2018
Given instruction to
ANM to update Cash
book & JSY Register.
Facility Yes Facility
PHC- Agalgaon
1) FP Vouchers are not
maintaned properly. 2)JSY
Voucher & Reg.not
maintaned properly.
2712/2018
1)Given instruction to
Clerck & LHV to
maintaned FP Vouchers
properly. 2)Given
instruction to LHV to
maintained JSY Voucher
& Reg.Properly.
Facility Yes Facility
SC-Agalgaon
1) Cash Book not
update.2)JSY Register not
update.
27/12/2018
Given instruction to
ANM to update Cash
book & JSY Register.
Facility Yes Facility
AragIncomplete Cash Book
,Vouche,jsy Payment
Miraj Block Accountant
,14/12/18
Cash book complited and
Jsy Payment Made to
Beneficiary
At Facility yes NA
NandreIncomplete Cash Book ,jsy
Payment21/12/18
Cash book complited and
Jsy Payment Made to
Beneficiary
At Facility yes NA
Sc Erandoli Incomplete Cash Book and
Voucher24/12/18
Instruction given to
ANMAt Facility yes NA
K.piranIncomplete Cash Book
,Voucher and RI Payment27/12/18
Cash book,Voucher
Updated and RI Payment
Made to Employee and
Asha
At Facility yes NA
PHC - Kundal
RKS & MO Cash
book,Voucher, Log book
Not update
Accountant Palus ,
13/12/2018
Instruction given to Clerk
& LHV to update
cashbook & Voucher
Facility Yes No
PHC - BhilawadiRKS & MO Cash book&
Voucher Not update Accountant 15/12/2018
Instruction given to Clerk
to update cashbook &
Voucher
Facility Yes No
District Sangli- Accountant
District Sangli- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC yelur Phc borgoan
RCH software Not Update
delivery are not as per nhm
norm
jsy work low
THO Walw (Dr. S A
patil),12-01-2018
1) Instruction given to
LHV to do 10 deliveries
in a month 3) Instruction
given to ANM to do JSY
benefit as per target . 3)
Instruction given to LHV
to keep MCTS update.
Facility Yes No
phc kameri
RCH software Not Update
delivery are not as per nhm
norm
jsy work low12-05-2018
1) Instruction given to
LHV to do 10 deliveries
in a month 3) Instruction
given to ANM to do JSY
benefit as per target . 3)
Instruction given to LHV
to keepRCH update.
Facility Yes No
phcyedemachindra
RCH software Not Update
delivery are not as per nhm
norm
jsy work low21/12/2018
1) Instruction given to
LHV to do 10 deliveries
in a month 3) Instruction
given to ANM to do JSY
benefit as per target . 3)
Instruction given to LHV
to keep RCH update.
Facility Yes No
sc sakharale
RCH software Not Update
delivery are not as per nhm
norm
jsy work low22/12/2018
1) Instruction given to
LHV to do 10 deliveries
in a month 3) Instruction
given to ANM to do JSY
benefit as per target . 3)
Instruction given to LHV
to keep RCH update.
Facility Yes No
phc borgaon
1) MO PHC cash book
written up to 01/12/2018 2)
RKS cash book upt
o01/12/2018 3) Proceding
not complited.
Walwa Block Accountant
(Smi. Priyanka Kamble),
01/12/2018
Instruction given to
Cleark to keep all
financial record updted.
Facility Yes No
phc yelur
1) MO PHC cash book
written up to 01/12/2018 2)
RKS cash book upt o
01/12/2018 3) PPIUCD Exp
not done
12-01-2018
Instruction given to
ANM to keep all
financial record updted.
Facility Yes No
District Sangli- THO Walw
District Sangli- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC kameri
1) MO PHC cash book
written up to 05/12/2018 2)
RKS cash book upt o
05/12/2018 3) PPIUCD Exp
not done
12-05-2018
Instruction given to
ANM to keep all
financial record updted.
Facility Yes No
PHC kurlap RCH software not
updated.
Walwa Block DEO
(Smt.V.L. Kamble),
05/12/2018
1) Instruction given to
LHV to do 10 deliveries
in a month 3) Instruction
given to ANM to do JSY
benefit as per target . 3)
Instruction given to LHV
to keep RCH update.
Facility Yes No
phc yedemachindra RCH software not
updated.12-08-2018
1) Instruction given
pmmvy correction 3)
Instruction given to
ANM to do JSY benefit
as per target . 3)
Instruction given to LHV
to keep RCh update.
Facility Yes No
SC sural RCH software not
updated. 14/12/2018
1) Instruction given
pmmvy correction 3)
Instruction given to
ANM to do JSY benefit
as per target . 3)
Instruction given to LHV
to keep RCh update.
Facility Yes No
phc peth RCH software not
updated. 14/12/2018
1) Instruction given
pmmvy correction 3)
Instruction given to
ANM to do JSY benefit
as per target . 3)
Instruction given to LHV
to keep RCh update.
Facility Yes No
Phc - Kheradewangi
log book Reg is not updated
2. cash book Reg is not
update
Kadegaon Block
Accountant (Krishana
Kamble) ,12-12-2018
Instruction given to Clerk
to update log book Reg.
etc.
Block Yes No
Phc -Hingangaon Bk Sc-
wangi
log book Reg is not updated
2. cash book Reg is not
update
15-12-2018
Instruction given to Clerk
to update log book Reg.
etc.
Block Yes No
District Sangli- DEO
District Sangli- Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Phc -Mohite Wadaon
proceeding Reg is not
updated 2. cash book Reg
is not update
19-12-2018
Instruction given to Clerk
to update Ledger Reg.
etc.
Block Yes No
Phc - Kheradewangi Sub-
center -amrapur, tondoli
proceeding Reg is not
updated 2. cash book Reg
is not update
21-12-2018
Instruction given to Clerk
to update proceeding
Reg. etc.
Block Yes No
Phc -Mohite Wadaon
proceeding Reg is not
updated 2. cash book Reg
is not update
31-12-2018
Instruction given to Clerk
to update Ledger Reg.
etc.
Block Yes No
SC Valivande Visit For Kayakalp DPM- S. G. Sawant-
04/12/2018Nil Facility NO NO
THO Devgad Visit For Kayakalp DPM- S. G. Sawant-
04/12/2018Nil Facility NO NO
PHC Morgaon Visit For Kayakalp DPM- S. G. Sawant-
17/12/2018Nil Facility NO NO
PHC Bhedshi Visit For Kayakalp DPM- S. G. Sawant-
18/12/2018Nil Facility NO NO
PHC Banda Visit For Kayakalp DPM- S. G. Sawant-
18/12/2018Nil Facility NO NO
PHC Banda
1) Quotation Process Not
follow proper Guidelines
2) Voucher File not
updated.
3)Rugn Kalyan Samitee
Meeting proceeding
register is Incompleted.
DAM - A. R. Gawade
12/12/2018
1)Instruction given to
PHC Clerk completed
recored
Facility Leval No No Pending
SDH Sawantwadi
1) Equipment status 2)
Manpower avialability 3)
Delivery status 4)
Appointment of contactual
staff 5) Non working
equipment
IPHS Co. 13/12/2018 Yes Facility M.S. Yes No
SDH Kankawali
1) Equipment status 2)
Manpower avialability 3)
Delivery status 4)
Appointment of contactual
staff 5) Non working
equipment
IPHS Co. 19/12/2018 Yes Facility M.S. Yes No
District Sindhudurg - DPM
District Sindhudurg - DAM
District Sindhudurg - IPHS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Mangaon
1) Equipment status 2)
Manpower avialability 3)
Delivery status 4) Model
District Survey
IPHS Co. 24/12/2018 Yes Facility M.O. Yes No
SDH Kankawali
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 01/12/2018 Yes Facility M.S. yes no
RH Devgad
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position,RI Supervison
CS 02/12/2018 Yes Facility M.S. yes no
RH Kudal
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 03/12/2018 Yes Facility M.S. yes no
Rh Malvan
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 5/12/2018 Yes Facility M.S. yes no
RH Katta
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position,RI Supervison
CS 5/12/2018 Yes Facility M.S. yes no
SDH sawantwadi
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 9/12/2018 Yes Facility M.S. yes no
RH dodamarg
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 10/12/2018 Yes Facility M.S. yes no
District Sindhudurg - CS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Vaibhavwadi
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS12/12/2018 Yes Facility M.S. yes no
SDH Shiroda
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position
CS 14/12/2018 Yes Facility M.S. yes no
RH Vengurla
Check Hospital Ward
cleaning Services,
Equipment status, medicine
Stock, Clinical
Performance, and Staff
position MR Supervision
CS 14/12/2018 Yes Facility M.S. yes no
Rh Dodamarg
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 01/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
RH Vengurla
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 03/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
RH Vaibhavwadi
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 06/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
RH Katta
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 10/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
RH Malvan
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 12/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
District Sindhudurg - RMO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Devgad
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 13/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
SDH Kankawali
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 17/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
SDH Shiroda
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 19/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
RH Kudal
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position
RMO 24/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
SDH Sawantwadi
Check Hospital Ward
cleaning Services,
Equipment status, NHM
record, Clinical
Performance, and Staff
position, MR supervision
RMO 26/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No
PHC Mond
1) MO quarter colour work
complete. 2) Plumbing work
complete.Junior Engineer, 05-12-
2018
Sangeli,DEIC
1) Visit of EE and Architect
about lay out and planing of
new PHC building
construction. 06-12-2018
DEIC
1) Laterite masonary work
is in progress. 06-12-2018
SDH Kankavli
1)Measurements talen for
estimate under Lakhya
progremm. 13-12-2018
SDH Kankavli
1)Measurements talen for
estimate under Lakhya
progremm. 16-12-2018
RH Devgad
1)Measurements taken for
estimate under Lakhya
progremm. 17-12-2018
District Sindhudurg - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Shirgaon
1)Colour work
measurements taken for
estimate under Ayushman
Bharat Scheme. 24-12-2018
PHC Mithabav
1)Colour work
measurements taken for
estimate under Ayushman
Bharat Scheme. 28-12-2018
PHC Elaye
1)Colour work
measurements taken for
estimate under Ayushman
Bharat Scheme. 28-12-2018
PHC Padel
1)Colour work
measurements taken for
estimate under Ayushman
Bharat Scheme. 29-12-2018
VHNSC Girode
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
Dr.R.S.Kartaskar
THO Dodamarg
01/12/2018
Giving instruction& send
Letter to MO & LHV Facility Yes No
VHNSC Bhekurli
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-01-2018
Giving instruction& send
Letter to MO & Clerk
& LHV
Facility Yes No
VHNSC Pikule
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-02-2018Giving instruction& send
Letter to MO & Clerk Facility Yes No
VHNSC Maneri
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-02-2018
Giving instruction& send
Letter to MO & Clerk
& LHV
Facility Yes No
PHC S.Bhedshi
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
12-05-2018Giving instruction& send
Letter to MO & ClerkFacility Yes No
PHC Morgaon
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
12-05-2018Giving instruction& send
Letter to MO & ClerkFacility Yes No
VHNSC Parame
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-05-2018Giving instruction& send
Letter to MO & BFFacility Yes No
VHNSC Avade
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-05-2018Giving instruction& send
Letter to MO & LHV Facility Yes No
VHNSC Ghotge
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-05-2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
District Sindhudurg - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Vhnsc Bhalaval
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-06-2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
VHNSC Konashi
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-06-2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
VHNSC Vilawade
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
12-06-2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
SC Tilari
UF fund Exp.very
low.Proceding book not
updated and MR Camp
Attend .
12-11-2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
SC Kalane
UF fund Exp.very
low.Proceding book not
updated and MR Camp
Attend .
13/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
VHNSC Kalane
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
13/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
SC Maneri
UF fund Exp.very
low.Proceding book not
updated and MR Camp
Attend .
17/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
PHC S.Bhedshi
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
19/12/2018
Giving instruction& send
Letter to MO & LHV &
Clerk
Facility Yes No
VHNSC Avade
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
19/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
VHNSC Sasoli
MR Camp Attend and
VHNSC Visti VHNSC
Exp.very Low
21/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
PHC Talkat
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
28/12/2018
Giving instruction& send
Letter to MO & LHV &
ANM
Facility Yes No
PHC Morgaon
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
H.S.Parab
Dodamarg Accontant
11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHSNC Virdi
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
District Sindhudurg - Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
VHNSC - Ugade
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Phondiye
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Ayee
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Talekhol
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Sasoli
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSS - P Punarvasan
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Ambadgaon
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHSNC Ambeli
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Kalane
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Morgaon
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
VHNSC Degave
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Maneri
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.
11/12/18
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
PHC Talkat
01) Asha Meeting Attend
02) Vhnsc exp.very low 03)
RKS Change report not
submetted to Dharmaday
Ayukt Office,Oras 11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Tambuli
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Phukeri
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Vilavade
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHSNC Talkat
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Sarmale
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Vapholi
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Zolambe
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
VHNSC Kumbral
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Asniye
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Gharpi
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Kudase
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Panturli
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHSNC Shirval
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Kolzar
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Bhekurli
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
VHNSC Konashi
01) Asha Meeting Attend
Guid for all Staff 02) Vhnsc
exp.very low 03) Not
planning for Exp.2018 19.11/12/2018
Giving instruction& send
Letter to MO & LHV
& BF
Facility Yes No
PHC S.Bhedshi
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
21/12/2018Giving instruction& send
Letter to MO & Clerk Facility Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Morgaon
Cheque Issud Register &
Advance Tracking Register
not updated.RKS Change
report not submetted to
Dharmaday Ayukt
Office,Oras
28/12/2018Giving instruction& send
Letter to MO & LHV Facility Yes No
PHC Umbarde
1) Pass book not updaed
from oct
2) cash book incomplete
3) vouchers incomplete till
the date form oct 2018
4) Noting Not made for
expenses done
5) Concurrent Audit
compliance Q 2 not made
yet. 6) cashbook Not Sign
By Authorised Person (i.e.
not signed by two
authorities each)
7) VHNSC Gratn Not
transfered
8) RKS payment made
without Block Accountant
remark
Accountant Block
Vaibhavwadi,Mr. S. S.
Kadam 27/12/2018
Give Instrunction to
PHC concern person to
complet record before
10/01/2019
facility Yes No
PHC Vaibhavwadi
1 ) cashbook Not Sign By
Authorised Person (i.e. not
signed by two authorities
each)
2) Expenses made on
vehicle repair not sent to
THO for expense book in
POL
3) Pass book not updated
4) Concurrent Audit
compliance Q 2 not made
yet. 5) RKS
payment made proceeding
book not given for
verification
Mr. S. S. Kadam
29/12/2018
Give Instrunction to
PHC concern person to
complet record before
10/01/2019
facility Yes No
DTC RatnagiriOutsourcing Data Operator
Training
DPM,Shri A.A.Chougale
04/12/2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training05-12-2018
Training given to
Outsourcing Data
Operator Block No No
DTC RatnagiriOutsourcing Data Operator
Training06-12-2018
Training given to
Outsourcing Data
Operator Block No No
District Sindhudurg - Accountant Block Vaibhavwadi
District Ratnagiri - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
DTC RatnagiriOutsourcing Data Operator
Training
DAM ,Smt Lata
Gunjawate 04/12/2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training05-12-2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training06-12-2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training
M & E Officer,Shri. Arun
S.Khadake 04/12/2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training05-12-2018
Training given to
Outsourcing Data
Operator
Block No No
DTC RatnagiriOutsourcing Data Operator
Training06-12-2018
Training given to
Outsourcing Data
Operator
Block No No
Tho Chiplun,Phc
Makhajan,SayaleVisit 28-12-2018
Given Instruction of
RCH Portal, HMIS,& All
Programmes
Block No No
RH SANGMESHWAR supervisory visit IPHS CO ORDINATOR
06-12-2018
FABER SINDOORI &
HLL WORK REVIEW Facility Yes No
RH PALI supervisory visit IPHS CO ORDINATOR
11/12/2018
VISIT AS PER CHECK
LISTFacility Yes No
RH DEVRUKH supervisory visit IPHS CO ORDINATOR
14/12/2018
FABER SINDOORI &
HLL WORK REVIEW Facility Yes No
RH LANJA supervisory visit IPHS CO ORDINATOR
26/12/2018
FABER SINDOORI &
HLL WORK REVIEW Facility Yes No
NP Zadgaon,Kirtinagar ASHA visit
District Cumulative
Mobilisor,Shri A. S.
Kambale 10/12/2018
Given Instruction to
ASHAFacility No No
DTC Ratnagiri ASHA visit 13-12-2018Given Instruction to
ASHAFacility No No
DTC Ratnagiri ASHA visit 14-12-2018Given Instruction to
ASHAFacility No No
DTC Ratnagiri ASHA visit 15-12-2018Given Instruction to
ASHAFacility No No
Tho Chiplun,Phc
MakhajanVisit 29-12-2018
Given Instruction to
BCM & Gat PrawartakFacility No No
District Ratnagiri - IPHS Co-ordinator
District Ratnagiri - DCM
District Ratnagiri - DAM
District Ratnagiri - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Panchayat Samiti
Mandangad & KhedMR Visit DHO,Dr.Aathlye 07/12/2018
Giving Instructions MR
Vaccine & MR Rubbela
Vaccine
Block No No
Tho lanja ,Z.P.School
MachalMR Visit 12-12-2018
Giving Instructions MR
Vaccine & MR Rubbela
Vaccine
Block No No
Tho Chiplun , Panchayat
Samiti ChiplunMR Visit 14-12-2018
Giving Instructions MR
Vaccine & MR Rubbela
Vaccine
Block No No
Panchayat Samiti
SangameshwarMR Visit 19-12-2018
Giving Instructions MR
Vaccine & MR Rubbela
Vaccine
Tho Khed, Tho
Chiplun,Tho Khed,Phc
Makhajan,Lote,
Adare,Sawarde
MR Visit 27-12-2018
Giving Instructions MR
Vaccine & MR Rubbela
Vaccine
Block No No
Phatak Highschool VisitADHO,Dr. M.R.Kore 04-12-
2018MR Campain Review Block No No
Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No
Secred Heart Highschool,
Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No
Zilla Parishad Purn
Prathamic Urdu
Shala,Kotawade
Visit 31-12-2018 MR Campain Review Block No No
Phatak Highschool VisitDRCHO,Dr. P.S. Thombare
04-12-2018MR Campain Review Block No No
Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No
Secred Heart Highschool,
Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No
Zilla Parishad Purn
Prathamic Urdu
Shala,Kotawade
Visit 31-12-2018 MR Campain Review Block No No
RH SANGMESHWAR supervisory visit civil Surgeon Dr.P.N.
Devkar 06/12/2018
VISIT AS PER CHECK
LISTFacility Yes No
District Ratnagiri - DHO
District Ratnagiri - ADHO
District Ratnagiri - DRCHO
District Ratnagiri - CS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH PALI supervisory visit
civil Surgeon
Dr.P.N. Devkar
11/12/2018
VISIT AS PER CHECK
LISTFacility Yes No
RH DEVRUKH supervisory visit
civil Surgeon
Dr.P.N. Devkar
14/12/2018
VISIT AS PER CHECK
LISTFacility Yes No
RH LANJA supervisory visit
Civil Surgeon
DR.P.N.DevkaR
26/12/2018
VISIT AS PER CHECK
LISTFacility
ACTION
BEING
TAKEN Facility
RH DEVRUKH
1) KAYAKALP
CHECKLIST NOT
FOLLOWED 2) BMW
RULES NOT FOLLOWED
3) CHECKLIST NOT
USED FOR RI
RMO (OR)
DR.SHERKHANE C.D. 07-
12-2018
TO FOLLOW ALL THE
RULES AND
CHECKLISTS
Facility
ACTION
BEING
TAKEN
Facility
RH PALI
1) KAYAKALP
CHECKLIST NOT
FOLLOWED 2) BMW
RULES NOT FOLLOWED
3) CHECKLIST NOT
USED FOR RI
RMO (OR)
DR.SHERKHANE
C.D.12/12/2018
TO FOLLOW ALL THE
RULES AND
CHECKLISTS
Facility
ACTION
BEING
TAKEN
Facility
RH LANJA
1) KAYAKALP
CHECKLIST NOT
FOLLOWED 2) BMW
RULES NOT FOLLOWED
3) CHECKLIST NOT
USED FOR RI
RMO (OR)
DR.SHERKHANE C.D.
21/12/2018
TO FOLLOW ALL THE
RULES AND
CHECKLISTS
Facility
ACTION
BEING
TAKEN
Facility
SDH KAMTHE
1) KAYAKALP
CHECKLIST NOT
FOLLOWED 2) BMW
RULES NOT FOLLOWED
3) CHECKLIST NOT
USED FOR RI
RMO (OR)
DR.SHERKHANE
C.D.24/12/2018
TO FOLLOW ALL THE
RULES AND
CHECKLISTS
Facility
ACTION
BEING
TAKEN
Facility
Phatak Highschool VisitMODTT,Dr. P.S. Thombare
04-12-2018MR Campain Review Block No No
Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No
Secred Heart Highschool,
Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No
District Ratnagiri - RMO
District Ratnagiri - MODTT
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Zilla Parishad Purn
Prathamic Urdu
Shala,Kotawade
Visit 31-12-2018 MR Campain Review Block No No
PHC Tale Site VisitDy. Engineer ,Shri. Amit
V. Sonwane 01/12/2018
For Status of Work
CheckingFacillity Yes No
PHC Tale Site Visit 07/12/2018For Status of Work
checking with EE sirFacillity Yes No
Sindhudurg Site Visit 06-12-2018For Status of Work
checking with EE sirFacillity Yes No
PHC Kotawade, PHC
Sakharapa, Warehouse,
DEIC, PHC Burambi
Site Visit 07-12-2018For Status of Work
CheckingFacillity Yes No
PHC Tale, SDH Dapoli Site Visit 08-12-2018For Status of Work
CheckingFacillity Yes No
DEIC Site Visit 14-12-2018
For Status of Work
Checking With CEO
Madam
Facillity Yes No
PHC Sakharapa Site Visit 19-12-2018For Status of Work
Checking Facillity Yes No
PHC Kotawade Site VisitJr. Engineer,Mrs. Vijaya
Bhalekar 07/12/2018
For Status of Work
checking with EE sirFacillity Yes No
PHC PAWAS, PHC
ChanderaiSite Visit 08-12-2018
For Status of Work
CheckingFacillity Yes No
PHC Sakharapa Site Visit 09-12-2018For Status of Work
CheckingFacillity Yes No
PHC Chanderai Site Visit 11-12-2018For Status of Work
CheckingFacillity Yes No
Warehouse , DEIC Site Visit 21-12-2018For Status of Work
CheckingFacillity Yes No
PHC Sakharapa Site Visit 23-12-2018For Status of Work
CheckingFacillity Yes No
PHC Burambi Site Visit 29-12-2018For Status of Work
CheckingFacillity Yes No
PHC Devhare SC
Mhapral
1 RKS Meeting not taken
2 PMMVY Forms
incomplete
3 Unitied SC Exp Less
THO MANDANGAD,Dr
P.S.Bhavthankar THO Dt
07/12/2018
Instructions given for
take RKS Meeting, keep
upto datePMMVY Forms
and untied SC Exp Less
Facillity Yes No
District Ratnagiri - Dy.Engineer
District Ratnagiri - Jr.Engineer
District Ratnagiri - THO MANDANGAD
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Peve
SC Ambvali
SC Palwani
1 immunisation not in time
2 Delivery Less
3 FP Cases Less
Dr P.S.Bhavthankar THO
Dt 11/12/2018
Instructions given for
start immunisation in
time, increase delivery
and increase FP Cases.
Facillity Yes No
SC Velas
SC Tide
SC Dahagaon
1 medicine Stock not
sufficient
2 PMMVY Form filling
Less
3 unties SC record
incomplete
Dr P.S.Bhavthankar THO
Dt 13/12/2018
Instructions given for to
maintain
sufficinetmedicine stock
and increase PMMVY
Form filling and
complete Untied SC
record
Facillity Yes No
SC Veshvi
SC Ambdave
SC Panderi
1 DHIS2 incomplete
2 JSY beneficiary a/c not
opened
3 RCH data entry less
Dr P.S.Bhavthankar THO
Dt 15/12/2018
Instructions given for
update DHIS2, Open
bank a/c for update rch
data entry.
Facillity Yes No
SC Umroli
SC Latwan
1 SC not Clean
2 VHNSC Exp less under
SC villages
3 United SC Exp Less
Dr P.S.Bhavthankar THO
Dt 17/12/2018
Instructions given for to
Keep SC Clean, to do
VHNSC Exp under the
SC and to do Exp. Of
united SC
Facillity Yes No
SC Valoute
SC Nargoli
1 Not sufficient Medicine
Stock
2 ANC Registration Less
3 Tour Diary Not available
Dr P.S.Bhavthankar THO
Dt 19/12/2018
Instructions given for
maintain sufficient
medicine stock, increase
ANC Registration and
keep Tour diary with
you.
Facillity Yes No
SC Peve
1 PMMVY Forms Less
Filled
2 FP eligible couple list not
update
3 RCH Register incomplete
Shri pandit Bapu Kolekar
Dt 12/12/2017
Instructions given for
increase PMMVY Form
filling, uptodate FP
Eligible couple list and
update RCH Register
Facillity Yes No
SC Tide
1 medicine Stock not
sufficient
2 JSY Beneficiary less
3 unties SC record
incomplete
Shri pandit Bapu Kolekar
Dt 13/12/2017
Instructions given for to
maintain
sufficinetmedicine stock
and increase JSY
beneficiary and complete
Untied SC record
Facillity Yes No
SC Veshavi
1 Due services not updated
2 JSY beneficiary a/c not
opened
3 RCH data entry less
Shri pandit Bapu Kolekar
Dt 14/12/2017
Instructions given for
update due services,
Open bank a/c for update
rch data entry.
Facillity Yes No
SC Latwan
1 JSY Exp Less
2 due services not updated
3 AMG SC exp Less
Shri pandit bapu kolekar
Dt 15/12/2017
Instructions given for to
increase JSY cases,
update due services and
to to AMG SC exp.
Facillity Yes No
District Ratnagiri - Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kelshi, PHC Anjarle,
PHC Asud, PHC UmbarlePHC visit THO Dapoli 08/12/2018
Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Pisai, Kavadoli,
RawtoliPHC visit nd MR THO Dapoli 10/12/2018
Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Pisai OPD THO Dapoli 11/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Pisai, Shivnari,
GawtaleOPD Nd MR THO Dapoli 12/12/2018
Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Sakhaloli Visit THO Dapoli 15/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Umbarle Visit THO Dapoli 27/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
PHC Anjarle Visit THO Dapoli 29/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
Gaotale, Mahamainagar (
kalamwadi)MR
BLOCK ACCOUNTANT,
07/12/2018
Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
Pan. Kazi, PHC Asud MR THO Dapoli 11/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
Bhivbandar, Panchanadi MR THO Dapoli 14/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
Gaorai, Mathegujar MR THO Dapoli 15/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
Chandikanagar MR THO Dapoli 17/12/2018Given Instrction to HA (
M/F) , Anm & Mo Facility Yes No
District Ratnagiri - THO Dapoli
District Ratnagiri - Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Furus
PHC Record Checked 2)
JSY Voucher Check 3)
Cash book check 3) about
M.R. Campaign.
THO CHIPLUN,01-12-
2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Kondmala
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
03-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
PHC Kharawate
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
04-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Chiplun Gadre School
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
05-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept PHC
compaus clean
Block Level YES No
Rampur Bamnoli
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
06-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept PHC
compaus clean
Block Level YES No
Nindivase
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
07-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept PHC
compaus clean
Block Level YES No
Asurde, Palvan
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
10-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Sawarde, Mandaki
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
2) Lnaugurate Mandki Sub
Center.
11-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Phurus Kutare School
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
12-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Dhakmoli
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
13-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
District Ratnagiri - THO CHIPLUN
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Derwan, Durgewadi
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
14-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Shirgaon
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
15-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
SC Parshuram
SC Record Checked 2) JSY
Voucher Check 3) Cash
book check
17-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Murtavade
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
18-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Kapare
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
19-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
SC Nirhal, Tamhnmala
SC Record Checked 2) JSY
Voucher Check 3) Cash
book check
20-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
SC Margtamhane
SC Record Checked 2) JSY
Voucher Check 3) Cash
book check
21-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept PHC
compaus clean
Block Level YES No
Bamnoli (Gudhe)
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
26-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Moravane, Kalkavane
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
27-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Nivali, Vahal, Devkheraki,
Naradkheraki, Rampur
1)Attended Gobar Rubela
Satra at Kondmala and
Checked Lasikarn Regiters.
29-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kharawate
PHC Record Checked 2)
JSY Voucher Check 3)
Cash book check
31-12-2018
All Registers And
Record should be
Maintained Properly.and
shuold be keept SC
compaus clean
Block Level YES No
SC Pedhambe
SC Record Checked 2)
Family Planing Cases make
100 % 4) SC Building &
Compus Keep Clean,
Cashbook Checked
BLOCK
ACCOUNTANT,12-12-
2018
Inform to Them To
Completed All
Accpounting Registes.
Block Level YES No
SC Nirvhal
SC Record Checked 2)
Family Planing Cases make
100 % 4) SC Building &
Compus Keep Clean,
Cashbook Checked
21-12-2018
Inform to Them To
Completed All
Accpounting Registes.
Block Level YES No
SC Khershet
SC Record Checked 2)
Family Planing Cases make
100 % 4) SC Building &
Compus Keep Clean,
Cashbook Checked
24-12-2018
Inform to Them To
Completed All
Accpounting Registes.
Block Level YES No
SC Terav
JSY Record Checked 2)
Family Planing Cases make
100 % 4) SC Building &
Compus Keep Clean,
Cashbook Checked
26-12-2018
Inform to Them To
Completed All
Accpounting Registes.
Block Level YES No
PHC Kharawte
PHC Record Checked 2)
Family Planing Cases make
100 % 4) SC Building &
Compus Keep Clean,
Cashbook Checked
31-12-2018
Inform to Them To
Completed All
Accpounting Registes.
Block Level YES No
Phc Watad Phc Visit & MR CampaignTHO Ratnagiri
01/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Avishkar School, RH Pali
& Phc Hatkhamba
Phc & School Visit & MR
CampaignTHO 04/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc Pawas & Mukul
Madhav Golap School
Phc & School Visit & MR
CampaignTHO 05/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc Malgund Phc Visit & MR Campaign THO 07/12/2018Instruction given to keep
record promptlyFacility Yes Facility
Sent Thomas School
Kuvarbhav & SC Bhoke
SC & School Visit & MR
CampaignTHO 10/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
District Ratnagiri - Accountant
District Ratnagiri - THO Ratnagiri
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Navnirman School Mirjole
& Phc Khanu
Phc & School Visit & MR
CampaignTHO 11/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Podar School & Phc
Hatkhamba
Phc & School Visit & MR
CampaignTHO 13/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Secret Heart School, SC
Shirgaon
SC & School Visit & MR
CampaignTHO 14/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc Pawas & SC PurngadPhc & SC Visit & Record
CheckingTHO 15/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc Jakadevi Phc Visit & MR Campaign THO 16/12/2018Instruction given to keep
record promptlyFacility Yes Facility
MS Naik School, GGPS &
SC Kolisare
SC & School Visit & MR
CampaignTHO 17/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc WatadPhc Visit & Record
CheckingTHO 19/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phatak Highschool & Phc
Malgund
Phc & School Visit & MR
CampaignTHO 20/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
SC DhamanseSC Visit & Record
CheckingTHO 26/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc Khanu & Phc
Hatkhamba
Phc Visit & Record
CheckingTHO 28/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
SC DevudSC Visit & Record
CheckingTHO 29/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc HatkhambaPhc Visit & Record
CheckingTHO 31/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Ori, Phc Jakadevi MR CampaignAccountant
01/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Mirjole, Patilwadi,
PhansawaleMR Campaign
Accountant
03/12/2018
Instruction given to keep
record promptlyFacility Yes Facility
Phc MalgundFinancial & physical Record
Checking
Accountant
12/12/2018
Expenditure payment are
made only by PFMS &
Instruction given to keep
record promptly
Facility Yes Facility
District Ratnagiri - Accountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Phc KhanuFinancial & physical Record
Checking
Accountant
13/12/2018
Expenditure payment are
made only by PFMS &
Instruction given to keep
record promptly
Facility Yes Facility
Phc Hatkhamba &
Grampanchayat
Financial & physical Record
Checking & VHNSC
Account
Accountant
14/12/2018
Expenditure payment are
made only by PFMS &
Instruction given to keep
record promptly
Facility Yes Facility
Phc KotawadeFinancial & physical Record
Checking
Accountant
19/12/2018
Expenditure payment are
made only by PFMS &
Instruction given to keep
record promptly
Facility Yes Facility
Phc PawasFinancial & physical Record
Checking
Accountant
21/12/2018
Expenditure payment are
made only by PFMS &
Instruction given to keep
record promptly
Facility Yes Facility
SC Umarath
1.Registers incomplete
2.work plan not foundTHO GUHAGAR
01/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Hedvi
1.Registers incomplete
2.work plan not foundTHO
03/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Kolawali
1.stock book incomplete
2.Reports were not
submitted THO
07/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Chindravale
1.Registers incomplete
2.work plan not foundTHO
10/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Umarath
Ranvi School
1.Registers incomplete
2.work plan not foundTHO
11/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Abloli
1.stock book incomplete
2.Reports were not
submitted THO
13/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Abloli
1.stock book incomplete
2.Reports were not
submitted THO
14/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
District Ratnagiri - THO GUHAGAR
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Hedvi
1.Registers incomplete
2.work plan not foundTHO
17/11/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Shivane
1.Registers incomplete
2.work plan not foundTHO
18/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Kotluk & Guhagar
1.Registers incomplete
2.work plan not foundTHO
19/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Abloli
SC Velneshwar
1.stock book incomplete
2.Reports were not
submitted THO
20/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
PHC Abloli
PHC Kolawali
1.stock book incomplete
2.Reports were not
submitted THO
21/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Chindravale
1.Registers incomplete
2.Voucher incompleteAccountant
10/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
SC Shivane
1.stock book incomplete
2.Reports were not
submittedAccountant
18/12/2018
Insructions were given to
staff to complete the
registers properly
Facility Yes -
Hingoli MR Campaign VisitCPM
4.12.2018MR Campaign No
Hingoli MR Campaign VisitCPM
5.12.2018MR Campaign NO
PHC WalujVisit for land inspection for
50 Beded Hospital
EE IDW Aurangabad Circle
4/12/2018
As per instructions by
Hon'ble DD Aurangabad
Health Services
inspected the Waluj PHC
with Dy. Er. For 50
Beded Hospital.
Dist. Level by Dy. Er. Yes
SNCU Sillod
1) Excavation depth 2)
Reinforcement for Jali
Footings 3) Speed of work
at SNCU Silod.
EE IDW Aurangabad Circle
5/12/2018
Inspect the site with J.
Er. & checked the 1)
Excavtion deth 2) Jali for
footing 3) Instruction has
given about speed up of
work at SNCU Sillod
Block level by J.Er. Yes
District Ratnagiri - Accountant
Circle Aurangabad - CPM
Circle Aurangabad - Ex.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
IDW NHM Z. P. ParbhaniReview of IDW works at
IDW NHM Z. P. Parbhani
EE IDW Aurangabad Circle
6/12/2018
Review of IDW Works
MCH wing 100 beded
Hospital, PHC
Ranisawargaon, Dist.
Warehouse Parbhani.
Dist. Level by Dy. Er. Yes
Dist. Ware House
Parbhani
1) Shuttering of slab 2)
Steel for slab & beams 3)
Speed of work
EE IDW Aurangabad circle
7/12/2018
Instruction has given
about 1) Shutttering of
slab should be in line
level & vertical supports
should be in plumb 2)
Steel for slab & beams
should be consider as per
RCC desing. 3) Increase
the speed of work at Dist.
Ware House Parbhani.
Dist. Level by Dy. Er. Yes
SC Kumbhephal, SC
Kinhola
1) Door, windows at SC
Kumbephal 2)
Colouring at SC
Kumbhephal 3) Paver
blocks at SC Kinhola
EE IDW Aurangabad circle
15/12/2018
Instructions has vien
about 1) Provide the
doors & windows with
accesseries as per
specifications given in
estimeate at SC
Kumbhephal 2) Finish
the surface & fill up the
patches before colouring
at SC Kumbhephal. 3)
Block level by J.Er.
Dist. Hospital HingoliMeeting at District Hospital
Hingoli
EE IDW Aurangabad circle
20/12/2018
For meeting conducted
by Hon'ble DD Health
Services Aurangabad
PHC Qtrs Goregaon.
1) Brick works 2) Joint
between the frames & brick
works 3) Speed of work
EE IDW Aurangabad circle
21/12/2018
Insructions has given
about 1) Curing the brick
works upto the required
period. 2) fill up the
joints between the frames
& brick work by cement
mortor properly. 3)
Increse the speed of work
at PHC Qtrs Goregaon.
Block level by J.Er. Yes
IDW NHM Z. P. Hingoli Meeting with DHO HingoliEE IDW Aurangabad circle
28/12/2018
Discussed with DHO
Hingoli about Health
wellness centres for PHC
& SC
PHC Siddeshwar
1) Colouring stages 2)
Concrete covers to
inspection chambers
3) Speed of work at PHC
Siddeshwar
EE IDW Aurangabad circle
29/12/2018
Insructions has given
about 1)Prepare the
surface before colouring
2) Provide the concrete
cover to inspection
chamber 3) Increase the
speed of work at PHC
Siddeshwar
Block level by J.Er.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1) Vijaya English School
2) Kids Magic English
School
3) Kids Ideal English
School
MR Campain VISIT
Ms. S.A. Thorat
(ppp-cordinator A'bad
Circle) Date : 6/12/2018
MR Campain VISIT
1) V.E.S. kids English
School
2) Shri Vidya Mandir
School
MR Campain VISIT
Ms. S.A. Thorat
(ppp-cordinator A'bad
Circle) Date : 7/12/2018
MR Campain VISIT
1) Sent. Frances English
School MR Campain VISIT
Ms. S.A. Thorat
(ppp-cordinator A'bad
Circle) Date : 19/12/2018
MR Campain VISIT
1) Ellora English School
2) Icon English School MR Campain VISIT
Ms. S.A. Thorat
(ppp-cordinator A'bad
Circle) Date : 20/12/2018
MR Campain VISIT
PHC VERUL, PHC
DOULTABAD
RI SESSION VISIT, MR
CAMPIAN VISIT
DHO
03/12/2018Yes Facility YES FACILITY
PHC SHIDHANATH
WADGAON
PHC VISIST, PHC
CONSTRACTION VISIT
DHO
06/12/2018Yes Facility YES FACILITY
SC DHAWALAPURI, SC
SHEKATA
SUBCENTER VISIST, RI
SESSION VISIT, MR
CAMPIAN VISIT
DHO
07/12/2018Yes Facility YES FACILITY
PHC ALAND, ANDHARI,
NACHANWEL,
CHINCHOLI L,
KANJKHED
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
DHO
12/12/2018Yes Facility YES FACILITY
PHC BHENDALA, SC
WAHEGAON
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
DHO
13/12/2018Yes Facility YES FACILITY
RH BIDKINRI SESSION VISIT, MR
CAMPIAN VISIT
DHO
15/12/2018Yes Facility YES FACILITY
PHC ALAND, SC
KHAMGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
DHO
28/12/2018Yes Facility YES FACILITY
PHC
GADHEPIMPALGAON,
LADGAON, SC
MAHALGAON,
DAHEGAON
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
DRCHO
03/12/2018 Yes Facility YES Facility
RH KANNAD,
DHABEGAON,
LANGADA TANDA
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
04/12/2018 Yes Facility YES Facility
District Aurangabad - DRCHO
Circle Aurangabad - PPP Co-ordinator
District Aurangabad - DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC SHIDHANATH
WADGAON,
GANGAPUR,
WAHEGAON
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
DRCHO
05/12/2018 Yes Facility YES Facility
SC DHAWALAPURIRI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
07/12/2018 Yes Facility YES Facility
PHC SHIDHANATH
WADGAON,
MAHALGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
11/12/2018 Yes Facility YES Facility
PHC PALOD,
DONGARGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
12/12/2018 Yes Facility YES Facility
TANDA BAZAR,
BORGAON SARWANI,
WAGHERA
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
13/12/2018 Yes Facility YES Facility
PHC UNADANGAON,
SIRSALA TANDA
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
14/12/2018 Yes Facility YES Facility
NILLOD,
BABHULGAON,
GAJANAN NAGAR
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
17/12/2018 Yes Facility YES Facility
PHC AMTHANA, SC
BHARADI, BORGAON
BAZAR
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
18/12/2018 Yes Facility YES Facility
PHC UNADANGAON,
TANDA BAZAR
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
21/12/2018 Yes Facility YES Facility
SDH SILLOD,
KHAMGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
22/12/2018 Yes Facility YES Facility
SC BHARADI,
GHATNANDRA
RI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
24/12/2018 Yes Facility YES Facility
RH AJINTA, MANGRULRI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
27/12/2018 Yes Facility YES Facility
PHC PALODRI SESSION VISIT, MR
CAMPIAN VISIT
DRCHO
31/12/2018 Yes Facility YES Facility
SC BAJAJNAGAR,
SAJAPUR
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
01/12/2018
Yes Facility YES FACILITY
ZALTA FATA, SC
KHUMBHEPHAL,
ADAGAON BU
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
04/12/2018
Yes Facility YES FACILITY
PHC DOULATABAD,
MALIWADA,
SHARANAPUR
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
05/12/2018
Yes Facility YES FACILITY
PHC GOLATGAON, SC
KARMAD, SC
SHENDRA
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
06/12/2018
Yes Facility YES FACILITY
District Aurangabad - ADHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC WARUDKAZI, SC
HIRAPUR, OKHARI,
SAWANGI
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
07/12/2018
Yes Facility YES FACILITY
SC PATODA, SC
PANDHARPUR,
BAJAJNAGAR
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
10/12/2018
Yes Facility YES FACILITY
PHC SHENDURWADA,
SC GHANEGAON
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
12/12/2018
Yes Facility YES FACILITY
SC CHITTEGAON,
BALAPUR, GANDHELI,
NIPANI
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
13/12/2018
Yes Facility YES FACILITY
SC BAJAJNAGAR,
WALUJ, WADGAON
KOLATI
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
14/12/2018
Yes Facility YES FACILITY
PHC KACHANER,
CHITTEGAON,
GHARDON
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
15/12/2018
Yes Facility YES FACILITY
PHC LADSAWANGI, SC
KARMAD, SHENDRA
PHC VISIST, RI SESSION
VISIT, MR CAMPIAN
VISIT
ADHO
DR. MADGE PATIL
17/12/2018
Yes Facility YES FACILITY
BALAPUR, PARIJAT
NAGAR, CIDKO
MAHANAGAR
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
20/12/2018
Yes Facility YES FACILITY
BAJAJNAGAR, WALUJ,
PARIJATNAGAR
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
24/12/2018
Yes Facility YES FACILITY
SC KHUMBHEPHAL,
GANDHELI,
BHALGAON,
APATGAON,
CHITTEGAON,
HIRAPUR
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
26/12/2018
Yes Facility YES FACILITY
SC CHOUKA,
JATWADA, JOGWADA
RI SESSION VISIT, MR
CAMPIAN VISIT
ADHO
DR. MADGE PATIL
27/12/2018
Yes Facility YES FACILITY
SC CHITTEGAON, RH
BIDKIN, SC
GIRNERTANDA
RI SESSION VISIT, MR
CAMPIAN VISIT
SO
03/12/2018 Yes Facility YES Facility
SC BOKUDJALGAON,
PATODE WADGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
SO
06/12/2018 Yes Facility YES Facility
SC SHEKATA,
AOURANGPURA
RI SESSION VISIT, MR
CAMPIAN VISIT
SO
11/12/2018 Yes Facility YES Facility
SC PAITHANKHEDA,
BHABHALGAON,
KESAPURI
RI SESSION VISIT, MR
CAMPIAN VISIT
SO
13/12/2018Yes Facility YES Facility
PHC NILAJGAONRI SESSION VISIT, MR
CAMPIAN VISIT
SO
17/12/2018 Yes Facility YES Facility
District Aurangabad - SO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Paithan Block MR Visit, Tq. PaithanDPM
17-12-2018Yes Facility YES Facility
PUNEPIP REAPROPRATION
MEETING
DPM
28-12-2018Yes Facility YES Facility
PHC
GADHEPIMPALGAON,
LADGAON, SC
MAHALGAON,
DAHEGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
M & E
03/12/2018Yes Facility YES Facility
PHC SHIDHANATH
WADGAON,
MAHALGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
M & E
11/12/2018Yes Facility YES Facility
PHC UNDANGAON,
SIRSALA TANDA
RI SESSION VISIT, MR
CAMPIAN VISIT
M & E
14/12/2018 Yes Facility YES Facility
SDH SILLOD,
KHAMGAON
RI SESSION VISIT, MR
CAMPIAN VISIT
M & E
22/12/2018 , Yes Facility YES Facility
PUNEPIP REAPROPRATION
MEETING
M & E
28/12/2018 Yes Facility YES Facility
PHC PALODRI SESSION VISIT, MR
CAMPIAN VISIT
M & E
31/12/2018 Yes Facility YES Facility
KANNADM R Visit Khunjkheda
Madarsa DQAC ,01-12-2018 Yes Facility YES Facility
Aurangabad MR VISIT 3-Dec-18 Yes Facility YES Facility
PhulambriMR VISIT AT
PHULAMBRI MADARSA4-Dec-18 Yes Facility YES Facility
Phc Kachner Sc Turkabad MR VISIT 5-Dec-18 Yes Facility YES Facility
Khultabad MR VISIT 6-Dec-18 Yes Facility YES Facility
Phc Kachner MR VISIT 7-Dec-18 Yes Facility YES Facility
Sc Gandheli MR VISIT AT GANDHELI 8-Dec-18 Yes Facility YES Facility
Ajanta MR VISIT AT Ajanta 14-Dec-18 Yes Facility YES Facility
Waluj MR Visit at Waluj 15-Dec-18 Yes Facility YES Facility
MUMBAI NQAS Mumbai Meeting 19-Dec-18 Yes Facility YES Facility
KANNADM R Visit Khunjkheda
Madarsa 20-Dec-18 Yes Facility YES Facility
PHC Borsar MR VISIT AT Ovar 21-Dec-18 Yes Facility YES Facility
Gangapur MR VISIT AT Gangapur 27-Dec-18 Yes Facility YES Facility
District Aurangabad - DPM
District Aurangabad - M&E OFFICER
District Aurangabad - QA Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
KANNADM R Visit Khunjkheda
Madarsa 31-Dec-18 Yes Facility YES Facility
SDH Sillod
1. PFMS & Baiomatric
Attadant . 2. BookS
Account Of Keeping .
3.Purchase Fill Procesure.
Give the instucion for
Maintain Update BookS
Of Account .
Maintain File Procesure. &
JSY Benifisher Paymant
Throw PFMS.RKS Audit
Compliance To give
instruction about Concerent
& Sat Audit Compliance
Krishna M Suradkar
(BFO C.S,C.Hospital Abad
)
Yes Facility level yes
R H Ajantha
1. PFMS & Baiomatric
Attadant . 2. BookS
Account Of Keeping .
3.Purchase Fill Procesure.
Give the instucion for
Maintain Update BookS
Of Account .
Maintain File Procesure. &
JSY Benifisher Paymant
Throw PFMS.RKS Audit
Compliance To give
instruction about Concerent
& Sat Audit Compliance
Krishna M Suradkar
(BFO C.S,C.Hospital Abad
)
Yes Facility level yes
RH Soygaon
1. PFMS & Baiomatric
Attadant . 2. BookS
Account Of Keeping .
3.Purchase Fill Procesure.
Give the instucion for
Maintain Update BookS
Of Account .
Maintain File Procesure. &
JSY Benifisher Paymant
Throw PFMS.RKS Audit
Compliance To give
instruction about Concerent
& Sat Audit Compliance
Krishna M Suradkar
(BFO C.S,C.Hospital Abad
)
Yes Facility level yes
PAITHAN HU
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
EMS CO-OD.,06-12-2018 Yes Facility YES YES
District Aurangabad - BFO
District Aurangabad - Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SOYGOAN
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
07-12-2018 Yes Facility YES YES
WALUJ POLICE
STATION
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
10-12-2018 Yes Facility YES YES
KARMAD RH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
11-12-2018 Yes Facility YES YES
DEVGAON RH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
18-12-2018 Yes Facility YES YES
VAIJAPUR SDH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
19-12-2018 Yes Facility YES YES
VAIJAPUR HIGHWAY
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
19-12-2018 Yes Facility YES YES
LASUR PHC
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
20-12-2018 Yes Facility YES YES
SHOOR PHC
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
21-12-2018 Yes Facility YES YES
KHULTABAD RH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
22-12-2018 Yes Facility YES YES
BANSILAL NAGAR
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
22-12-2018 Yes Facility YES YES
SILKMILL COLONY
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
22-12-2018 Yes Facility YES YES
ALAND PHC
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
27-12-2018 Yes Facility YES YES
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
AJINTHA RH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
28-12-2018 Yes Facility YES YES
DHORKIN SC
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
29-12-2018 Yes Facility YES YES
KANNAD RH
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
31-12-2018 Yes Facility YES YES
HATNUR PHC
1) Medicine Checkup
2) Equipment Checkup
3) Consumables Checkup
31-12-2018 Yes Facility YES YES
PHC Kumbhar
pimplagaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning
DHO,Dr. V. B.
Khatgaonkar 01.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken. MR Campaign
Visit
THO/MO/ANM Yes No
PHC Tirthpuri
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning
Dr. V. B. Khatgaonkar
01.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken. MR Campaign
Visit
THO/MO/ANM Yes No
District Jalna - DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Pimparkhed
1] Taken the review of
Family Planning & no
planning of FP. 2)Given
instruction about RI
Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 4]
Staff Problem.
Dr. V. B. Khatgaonkar
01.12.2018
1]Instruction given about
100 % performance of
Family Planning and did
the Camp Planning - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff Problem.
5}taken prevension
activity for Dengu, MR
Campaign Visit
THO/MO/ANM Yes No
THO Partur
1] Block Level Probleme..
2)Given instruction about
RI Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic, PMMVY
etc. 4] Staff Problem., 5]
MR Campaign review
Meeting
Dr. V. B. Khatgaonkar
04.12.2018
1]Instruction given to
THO About micro Plan
be as per plan. - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff
Problem.5] HMIS RCH
Portal Indicators wise
reviews, 6] MR Capaign
information and review
THO/MO/ANM Yes No
PHC Watur
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning 5] MR Campaign
School Visit
Dr. V. B. Khatgaonkar
04.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken. 6]MR Campaign
School Benif. and Report
Check
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Chitali Putali
1] Taken the review of
Family Planning & no
planning of FP. 2)Given
instruction about RI
Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 4]
Staff Problem.
Dr. V. B. Khatgaonkar
04.12.2018
1]Instruction given about
100 % performance of
Family Planning and did
the Camp Planning - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff Problem.
5}taken prevension
activity for Dengu
THO/MO/ANM Yes No
PHC Ashti
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
04.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
PHC Shrishti
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
04.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Viregaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
04.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
PHC Dongaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
11.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
PHC Warud
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
11.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Khasgaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
11.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
PHC Mahora
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
11.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
SC Bharaj
1] Taken the review of
Family Planning & no
planning of FP. 2)Given
instruction about RI
Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 4]
Staff Problem.
Dr. V. B. Khatgaonkar
11.12.2018
1]Instruction given about
100 % performance of
Family Planning and did
the Camp Planning - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff Problem.
5}taken prevension
activity for Dengu
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kedarkheda
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
11.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
PHC Du Kalegaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
13.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
6]MR Campaign School
Benif. and Report Check
THO/MO/ANM Yes No
SC Gola Pangari
1] Taken the review of
Family Planning & no
planning of FP. 2)Given
instruction about RI
Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 4]
Staff Problem.
Dr. V. B. Khatgaonkar
13.12.2018
1]Instruction given about
100 % performance of
Family Planning and did
the Camp Planning - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff Problem.
5}taken prevension
activity for Dengu
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Jalna
1] Block Level Probleme..
2)Given instruction about
RI Session quality 3]Taken
review of all Health
Indicator- Specially Family
Planning Programme,
Delivery Performance at
SC, RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic, PMMVY
etc. 4] Staff Problem., 5]
MR Campaign review
Meeting, Podar School
Jalna
Dr. V. B. Khatgaonkar
13.12.2018
1]Instruction given to
THO About micro Plan
be as per plan. - 2]
Given Guidelines of RI
Session .3] Taken review
of All Health Indicator
and Taken Action. 4]
Solved the Staff
Problem.5] HMIS RCH
Portal Indicators wise
reviews, 6] MR Capaign
information and review
THO/MO/ANM Yes No
PHC Wakulni
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
15.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
PHC Shelgaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
15.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
Yunani RoshangaonYunani Dawakhana
Roshangaon Visit
Dr. V. B. Khatgaonkar
15.12.2018
Yunani Dhawakhana
Visit THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Manegaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit and All
Record Verify
Dr. V. B. Khatgaonkar
20.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list 6]
All Record Keep
Maintaned and timly
updation
THO/MO/ANM Yes No
PHC Anwa
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
22.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
PHC Jalgaaon Sapakal
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
22.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Walsawangi
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
22.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
PHC Re. Pimpalgaon
1)Given instruction about
RI Session & IRIM.
2]Taken review of all
Health Indicator- Specially
Family Planning
Programme, Delivery
Performance at PHC/SC,
RCH Web Portal, RCH
Indicator, TB, lep., Malaria
,IDSP , epidemic etc. 3]
Staff Problem. 4) Family
Planning, 5] MR Capaign
Session Visit
Dr. V. B. Khatgaonkar
22.12.2018
1] Given Guidelines of
RI Session .2] Taken
review of All Health
Indicator and Taken
Action against Poor
Performing PHC/SC.3]
Solved the Staff Problem.
4) Family Planning Camp
regularly week, 5}
Review of Sathrog
Taken., 5] MR Capaign
Session Visit and
Instruction and veryfy to
report and check list
THO/MO/ANM Yes No
RH Bhokardan
1.Urban Area Rch web
Portal performance is poor
2. MR Booth is working
slow
3. Infrastracture report is
not updated yet
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
06/12/2018
1.Urban Area Rch web
Portal performance
should be improve
2. Given feedback about
MR Campaining
3. Given Feedback about
HMIS Correction and
infrastracture report For
Year 2018-19
MS/Staff YES NO
THO Office Bhokardan
1. PHC Wise Progressive
Report is not present of MR
Campaining
2.JSY Benefit given to
Mother is very Poor.
3. RCH Web Portal Child
Registration is poor.
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
06/12/2018
1.Told to BPA compile
the PHC Wise the MR
Campaining Report
correctly in time.
2. Give JSY Benefit to
JSY Mother as soon as
possible.
3. RCH Web Portal
Child Registration should
be increase.
BNO/BPA YES NO
District Jalna - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Danapur
1.MR- Supervision
2. 4 Vaccination Booth
Visited 1] In Marathi Z.P.
Primary School Danapur-
Some Benif. Not taking
vaccination. 2] in Urdu Z.P.
Primary School Danapur-
All Benificiary parents
appose to MR
Vaccination.3] In Moriya
English School Danapur-
IEC Material not present.4]
In urdu school danapur-
presenty not 100%
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
06/12/2018
1.MR- Supervision
2.In Urdu and Marathi
Z.P. Primary School
Danapur-Called Parent
meeting in school and
given feedback about
MR then MR
Vaccination started &
Feedback given to
related staff.
MO/ Staff YES NO
PHC Pirpimpalgaon
1.MR- Supervision
2. MR Booth not present in
PHC Bilding
3. MR Progressive report
format is incomplete
4. RCH Web portal PW and
Child Entry and updation
not 100% 5] JSY
Performance is poor.
6] Validation Committee
register not present
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
7/12/2018
Given feedback about
MR Campaining, RCH
Web Portal, JSY, HMIS
Data Correction etc.MO/ Staff YES NO
PHC Rajur
1.MR- Supervision
2. MR Booth not present in
PHC Bilding
3. MR Progressive report
format is incomplete
4. RCH Web portal PW and
Child Entry and updation
not 100% 5] JSY
Performance is poor.
6] Validation Committee
register not present
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
7/12/2018
Given feedback about
MR Campaining, RCH
Web Portal, JSY, HMIS
Data Correction etc.MO/ Staff YES NO
PHC Kedarkheda
1.MR- Supervision
2. MR Booth not present in
PHC Bilding
3 MR Progressive report
format is incomplete
4. RCH Web portal PW and
Child Entry and updation
not 100% 5] JSY
Performance is poor.
6] Validation Committee
register not present
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
7/12/2018
Given feedback about
MR Campaining, RCH
Web Portal, JSY, HMIS
Data Correction etc.MO/ Staff YES NO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Office Bhokardan
1.MR- Supervision
2.MR Progressive report
format is incomplete
3] RCH Web Portal-
PW/Child Data Entry and
Updation is Poor. 4]
JSY Performance is poor.
5] HMIS Correction is
remaining yet.
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
7/12/2018
Given feedback about
MR Campaining, RCH
Web Portal, JSY, HMIS
Data Correction etc.MO/ Staff YES NO
PHC Anwa
1.MR- Supervision
2. 4 Vaccination Booth
Visited 1] In Marathi
Z.P.Secondary School
Anwa- Booth No.1 AD
Syring not cutted, AEFI Kit
not present 2] In Marathi
Z.P. Primary School Anwa-
AD Syring not cutted 3] in
Urdu Z.P. Primary School
Anwa- AD Syring not
cutted.4] In Abdul shakur
Urdu School-presenty not
100%
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
11/12/2018
Given feedback about
MR CampainingMO/ Staff YES NO
PHC Jalgoan Sapkal
1.MR- Supervision
2. MR Booth is present in
PHC Bilding
3. MR Report is not
completed on given format
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
11/12/2018
Given feedback about
MR CampainingMO/ Staff YES NO
Village Karjgaon
1.MR- Supervision- MR
Session is conducted nicely Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
11/12/2018
Given feedback about
MR CampainingMO/ Staff YES NO
PHC Hasanabad
1.MR- Supervision
2. MR Booth is present in
PHC Bilding
3. MR Report is not
completed on given format
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
18/12/2018
Given feedback about
MR CampainingMO/ Staff YES NO
Village Goshegaon
1.MR- Supervision
2. Anganwadi Session-
Vaccination form not filled
completely, date is not
correct written on form.
Sunil Tukaram Bodkhe,
DM&EO, NHM Jalna
18/12/2018
Given feedback about
MR CampainingMO/ Staff YES NO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Gola pangari Cold chain supervisionB.A.Nehete (C.C.T)
02/11/2018ILR Repair C.C.T Yes No
Health post Ramnagar
Cold chain supervisionB.A.Nehete (C.C.T)
05/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
RH Bhokardan
Cold chain supervisionB.A.Nehete (C.C.T)
06/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
DVS JALNA
Cold chain supervisionB.A.Nehete (C.C.T)
12/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc Aashti Cold chain supervisionB.A.Nehete (C.C.T)
19/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
Rh partur Cold chain supervisionB.A.Nehete (C.C.T)
19/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc satona Cold chain supervisionB.A.Nehete (C.C.T)
19/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc Hasnabad Cold chain supervisionB.A.Nehete (C.C.T)
20/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc kedarkheda Cold chain supervisionB.A.Nehete (C.C.T)
20/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc pir pimpalgaon Cold chain supervisionB.A.Nehete (C.C.T)
20/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc jamkhed Cold chain supervisionB.A.Nehete (C.C.T)
21/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc wadigodri Cold chain supervisionB.A.Nehete (C.C.T)
21/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc D pimpri Cold chain supervisionB.A.Nehete (C.C.T)
21/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc khasgaon Cold chain supervisionB.A.Nehete (C.C.T)
21/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
phc warud Cold chain supervisionB.A.Nehete (C.C.T)
22/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
RH Tembhurni Cold chain supervisionB.A.Nehete (C.C.T)
22/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
RH Jafrabad Cold chain supervisionB.A.Nehete (C.C.T)
22/11/2018
cold chain equipment
preventive maintainance C.C.T Yes No
kumbhephal new SC construction visit01/12/2018
Shri Lodhi M M (JE)Estimate Purpose SC Yes No
kumbhephal new SC construction visit03/12/2018
Shri Lodhi M M (JE)Meeting with contractor SC Yes No
kumbhephal new SC construction visit04/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit05/12/2018
Shri Lodhi M M (JE)13th finance work visit SC Yes No
kumbhephal new SC construction visit06/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit07/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit10/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
District Jalna - C.C.T
District Jalna - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
kumbhephal new SC construction visit12/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
Kinhola new SC construction visit13/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
Aurangabad laqshya estimate 14/12/2018
Shri Lodhi M M (JE)
new SC construction
visitDivision Yes No
Kinhola new SC construction visit15/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit17/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
Aurangabad laqshya estimate 18/12/2018
Shri Lodhi M M (JE)
new SC construction
visitDivision Yes No
kumbhephal new SC construction visit21/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit26/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
Kinhola new SC construction visit28/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit30/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit31/12/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
kumbhephal new SC construction visit30/11/2018
Shri Lodhi M M (JE)
new SC construction
visitSC Yes No
Tembhurni13th finance Delivery room
upgradation
01/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationRH Yes No
Ashti13th finance Delivery room
upgradation
03/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
Jalgaon sapkal13th finance Delivery room
upgradation
04/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
Satona13th finance Delivery room
upgradation
05/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
Mantha BSU site visit06/12/2018
Shri Vilas Ghodke (JE)BSU site visit RH Yes No
Satona13th finance Delivery room
upgradation
07/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
Jafrabad13th finance Delivery room
upgradation
11/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationRH Yes No
Satona13th finance Delivery room
upgradation
12/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
District Jalna - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Ashti Survey for DR upgradation13/12/2018
Shri Vilas Ghodke (JE)
Survey for DR
upgradationPHC Yes No
khasgaon13th finance Delivery room
upgradation
14/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
warud13th finance Delivery room
upgradation
15/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
khasgaon UG tank reparing18/12/2018
Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No
partur13th finance Delivery room
upgradation
19/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationRH Yes No
khasgaon UG tank reparing20/12/2018
Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No
khasgaon UG tank reparing20/12/2018
Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No
mumbai PIP hard copy submission20/12/2018
Shri Vilas Ghodke (JE)
PIP hard copy
submissionMumbai Yes No
Jalgaon sapkal13th finance Delivery room
upgradation
31/12/2018
Shri Vilas Ghodke (JE)
13th finance Delivery
room upgradationPHC Yes No
State Level Meeting Cum
Workshop, at YASHDA,
Pune.
01) Detailed review given
about PMMVY .
02) Sharing Problems of fill
up form with DPC.
03) Detailed review given
about DTF& BTF Meeting.
04) Instruction given by
state about increase
beneficiaries.
Murlidhar O. Varma, Dist.
Programme Coordinator
04/12/2018
01) File putup as per
state instruction .
02) As per state
instruction contact with
BPA & BCM.
03) Followup given of
Printing of Form &
Pomplet file.
04) File putup for
seperate bank accout.
DPC Yes DISTRICT
PMMVY Monitoring, at
PHC Khasgaon &
Mohara, Block Jafrabad.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
05/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/MO Yes PHC
District Jalna - DPC
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PMMVY Monitoring, at
PHC Hasnabad.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
07/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/MO Yes PHC
Block Level BF & BCM
Meeting, at T.H.O. office,
Ghansawangi.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
12/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO
Block Level BF & BCM
Meeting, at T.H.O. office,
Partur.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
13/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO
Block Level BF & BCM
Meeting, at T.H.O. office,
Badnapur.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
19/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO
PMMVY Monitoring, at
PHC Khasgaon, Block
Jafrabad.
01) Introduction given
about PMMVY .
02) Sharing Problems of fill
up form with BPA.
03) Information given about
Post Office Bank Account.
04) ASHA aware about
ASHA Honorium.
Murlidhar O. Varma, Dist.
Programme Coordinator
27/12/2018
01) Guideline given
about PMMVY .
02) Review of PMMVY.
03) Information given
about Post Office Bank
Account.
04) Guideline sharing
about ASHA Honorium.
ASHA/BF/MO Yes PHC
District Jalna - RKS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Ambad, PHC
JamkhedRKS Visit RKS Co.05.12.2018
Disscuss with MO
Regarding GB and EC
Meetings and
Ecpenditure as per
guidlnes and about RKS
record keeping, and
RKSD Audit report fill
online and submit charit
y commisioner office
MO Yes NO
PHC Karla RKS Visit 11.12.2018
Disscuss with MO
Regarding GB and EC
Meetings and
Ecpenditure as per
guidlnes and about RKS
record keeping, and
RKSD Audit report fill
online and submit charit
y commisioner office
MO Yes NO
PHC Somthana RKS Visit 12.12.2018
Disscuss with MO
Regarding GB and EC
Meetings and
Ecpenditure as per
guidlnes and about RKS
record keeping, and
RKSD Audit report fill
online and submit charit
y commisioner office
MO Yes NO
THO Ambad
1)Taken the review if
ASHA Vacancy 2) Given
instruction about ASHA
performance & Incentive 3)
Prakalp Prerna review 4)
ASHA Training Information
Update In Software 5) PIP
2018-19 New Guideline
DCM, Ashwini Punewad
05/12/2018
1) Instruction given
about 100 %
performance of ASHA
Software And Paid
ASHA Incentive In time
2] Give the Prakalp
Prerna Reporting intime
3] Non-Performing
ASHA Line list Month of
April 18 to Nov 18 With
THO Sign Hard copy 5)
New Guideline
information
BCM/BF Yes No
PHC Kedarkheda, Rajur,
Pripimlgaon
1)Taken the review if
ASHA Vacancy 2) Given
instruction about ASHA
performance & Incentive 3)
Prakalp Prerna review 4)
ASHA Training Information
Update In Software 5) PIP
2018-19 New Guideline
Ashwini Punewad
07/12/2018
1) Instruction given
about 100 %
performance of ASHA
Software And Paid
ASHA Incentive In time
2] Give the Prakalp
Prerna Reporting intime
3] Non-Performing
ASHA Line list Month of
April 18 to Nov 18 With
THO Sign Hard copy 5)
New Guideline
information
BCM/BF Yes No
District Jalna - DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Karla
1)Taken the review if
ASHA Vacancy 2) Given
instruction about ASHA
performance & Incentive 3)
Prakalp Prerna review 4)
ASHA Training Information
Update In Software 5) PIP
2018-19 New Guideline
Ashwini Punewad
11.12.2018
1) Instruction given
about 100 %
performance of ASHA
Software And Paid
ASHA Incentive In time
2] Give the Prakalp
Prerna Reporting intime
3] Non-Performing
ASHA Line list Month of
April 18 to Nov 18
With THO Sign Hard
copy 5) New Guideline
information
BCM/BF Yes No
PHC Shelgaon
1)Taken the review if
ASHA Vacancy 2) Given
instruction about ASHA
performance & Incentive 3)
Prakalp Prerna review 4)
ASHA Training Information
Update In Software
Ashwini Punewad
12.12.2018
1) Instruction given
about 100 %
performance of ASHA
Software And Paid
ASHA Incentive In time
2] Give the Prakalp
Prerna Reporting intime
3] Non-Performing
ASHA Line list Month of
April 18 to Nov 18 With
THO Sign Hard copy 5)
New Guideline
information
BCM/BF Yes No
PHC SEWALI
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 04-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
PHC VIREAON
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 06-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC UTWAD
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 13-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC PACHANWADGAON
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 17-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
District Jalna - THO Jalna
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC KARLA
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 20-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC WADIWADI
1 RCH
2 PFMS JSY list
3 Accountancy
DR.SHITAL SONI THO
JALNA 27-12-2018
1]Instruction given about
FMR code
2]Instruction given about
100 % performance RCH
3] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
PHC SEWALI1 RCH
2 PFMS JSY list
Shri S S BHABAT
Program Asst 04-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
PHC VIREAON1 RCH
2 PFMS JSY list
Shri S S BHABAT
Program Asst 06-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC UTWAD1 RCH
2 PFMS JSY list
Shri S S BHABAT Program
Asst 13-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC PACHANWADGAON1 RCH
2 PFMS JSY list
Shri S S BHABAT
Program Asst 17-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC KARLA1 RCH
2 PFMS JSY list
Shri S S BHABAT
Program Asst 20-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
SC WADIWADI1 RCH
2 PFMS JSY list
Shri S S BHABAT
Program Asst 27-12-2018
1]Instruction given about
100 % performance RCH
2] Instruction given
about quality JSY list for
PFMS.
MO/HA/LHV/ANM/MPW Yes No
District Jalna - Program Asst.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RASHTRAMATA
INDIRA GHANDHI
SCHOOL,JALNA
RKSK and WIFS VISIT
MAYA ARVIND SUTAR
RKSK COUNSELOR
08/12/2018
PHYSICAL
CHANGES,DIET,ANE
MIA,MAITRI CLINIC
INFORMATION
Head Master YES No
JES COLLAGE,JALNA RKSK and WIFS VISIT
MAYA ARVIND SUTAR
RKSK COUNSELOR
19/12/2018
PHYSICAL
CHANGES,DIET,ANE
MIA,MAITRI CLINIC
INFORMATION
Principal YES No
SDH AMBAD RKSK and WIFS VISIT
MAYA ARVIND SUTAR
RKSK COUNSELOR
22/12/2018
Monthly visit MS/ RKSK Counselor YES No
RH NER RKSK and WIFS VISIT
MAYA ARVIND SUTAR
RKSK COUNSELOR
27/12/2018
Monthly visit MS/ RKSK Counselor YES No
RH TEMBHURNI RKSK and WIFS VISIT
MAYA ARVIND SUTAR
RKSK COUNSELOR
28/12/2018
Monthly visit MS/ RKSK Counselor YES No
Anganwadi Visit RBSK Co.04.12.2018
Give Instruction about
health check up & refer
student to deic
MS/ RKBSK Team YES No
SDH .Ambadreviwe meeting is arrenged
AT SDH Ambad18.12.2018
Give Instruction about
health check up & refer
student to deic
MS/ RKBSK Team YES No
R.H.Manthareviwe meeting is arrenged
AT RH Mantha20.12.2018
Give Instruction about
health check up & refer
student to deic
MS/ RKBSK Team YES No
RH Temburni
reviwe meeting & AWC
Visit is arrenged AT RH
Tembhurni
26.12.2018
Give Instruction about
health check up & refer
student to deic
MS/ RKBSK Team YES No
R.H.PARTURreviwe meeting is arrenged
of PARTUR mo 28.12.2018
Give Instruction about
health check up & refer
student to deic
MS/ RKBSK Team YES No
SFWB PuneNHM PIP 2018-19 Re-
appropriation meeting
Mr Pawan A Wadkar CPM
NHM Latur Circle
28/12/2018
NHM PIP 2018-19 Re-
appropriation meetingFacility Level Yes No
NUHM Nanded Regarding MR Campaign
visit
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
01/12/2018
Regarding MR
Campaign visitFacility Level Yes No
District Jalna - RKSK Co.
District Jalna - RBSK Co.
Circle Latur - CPM
Circle Latur - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Block Tulajapur Dist
Osmanabad
Regarding MR Campaign
visit
1) ZP Primary School
Ramdayani 2) ZP Primary
School Jawalga M 3 ) THO
Office Tuljapur
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
06/12/2018
Regarding MR
Campaign visit
1) ZP Primary School
Ramdayani 2) ZP
Primary School Jawalga
M 3 ) THO Office
Tuljapur
Facility Level Yes No
NHM Beed Block Patoda
Block Ashti
Regarding MR Campaign
visit
1) ZP Primary School
Pimpalgaon Dhas 2) ZP
High School Satola 3 )
NHM Beed
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
07/12/2018
Regarding MR
Campaign visit
1) ZP Primary School
Pimpalgaon Dhas 2) ZP
High School Satola 3 )
NHM Beed
Facility Level Yes No
DH Nanded & NHM
Nanded
Regarding MR Campaign
visit
1) DH Nanded 2) NHM
Nanded
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
20/12/2018
Regarding MR
Campaign visit
1) DH Nanded 2) NHM
Nanded
Facility Level Yes No
NUHM Nanded Regarding MR Campaign
visit
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
21/12/2018
Regarding MR
Campaign visitFacility Level Yes No
HFWTC AurangabadHealth wellness Clinic VC
Attend
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
24/12/2018
Health wellness Clinic
VC AttendFacility Level Yes No
NHM Beed
1.Regarding MR Campaign
visit
2.PMMVY Review
3. HMIS & RCH poratl
Review
Mr Sandip S Yadav
CM&EO NHM Latur
Circle
29/12/2018
1.Regarding MR
Campaign visit
2.PMMVY Review
3. HMIS & RCH poratl
Review
Facility Level Yes No
1) Brickwork of super
Structure of Maherghar in
Progress.
2) Steel cutting of Lintel in
Progress.
3) Curing in progress.
RH Dharmabad Dist
Nanded
Visit to new construction of
Staff Quarters at RH
Dharmabad Dist. Nanded.
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Visit to new construction
of Staff Quarters at RH
Dharmabad Dist.
Nanded.
IDW Staff Z.P.
Nanded
Circle Latur - Ex.Engineer
PHC Lohagaon Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1) Brickwork of Plinth of
Staff Quarters in Progress.
2) Steel cutting of Ground
Floor slab in Progress.
3) Curing in progress.
1) Compaction of Murum
for plinth in Progress.
2) Steel binding for PCC at
plinth in progress.
3) Curing in progress.
1) Concreting of plinth
Beam Maherghar in
Progress.
2) Steel cutting of column
in Progress.
3) Curing in progress.
1) Brickwork of Plinth of
Staff Quarters in Progress.
2) Concreting of Ground
Floor slab in Progress.
3) Curing in progress.
PHC Sirajkhod Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 14/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
PHC Karkheli Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
SC Rajapur Dist. Nanded
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
PHC Sirajkhod Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
RH Dharmabad Dist
Nanded
Visit to new construction of
Staff Quarters at RH
Dharmabad Dist. Nanded.
Mr. Khade N.P., Executive
Engineer
Dt 04/12/2018
Visit to new construction
of Staff Quarters at RH
Dharmabad Dist.
Nanded.
IDW Staff Z.P.
Nanded
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1) Brickwork of super
Structure above Lintel level
of Maherghar in Progress.
2) Steel cutting of slab in
Progress.
3) Curing in progress.
1) Brickwork of Maherghar
in Progress.
2) Steel cutting in Progress.
3) Curing in progress.
1) Brickwork of SC in
Progress.
2) Plastering of SC in
Progress.
3) Curing in progress.
1) Finishing work of SC in
Progress.
2) Name plate of SC in
Progress.
3) Curing in progress.
SC Shemboli Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 14/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
SC Dudhad Dist. Nanded
Mr. Khade N.P., Executive
Engineer
Dt 14/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
PHC Sarsam Dist. Nanded
Mr. Khade N.P., Executive
Engineer
Dt 14/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
PHC Lohagaon Dist.
Nanded
Mr. Khade N.P., Executive
Engineer
Dt 14/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
1) Brickwork of compound
wall in Progress.
2) Steel Binding of slab of
Staff Quarters in Progress.
3) Curing in progress.
1) Excavation of footing of
Staff Quarters in Progress.
2) PCC of footing of Staff
Quarters in Progress.
3) Curing in progress.
Nilanga BlockDr G G Parge, Dist Health
Officer, Latur 02/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Ausa BlockDr G G Parge, Dist Health
Officer, Latur 04/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Ahmedpur BlockDr G G Parge, Dist Health
Officer, Latur 08/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Renapur BlockDr G G Parge, Dist Health
Officer, Latur 13/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Deoni BlockDr G G Parge, Dist Health
Officer, Latur 15/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Nilanga & Deoni BlockDr G G Parge, Dist Health
Officer, Latur 16/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Chakur BlockDr G G Parge, Dist Health
Officer, Latur 17/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Udgir BlockDr G G Parge, Dist Health
Officer, Latur 18/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
District Latur - DHO
PHC Yermala Dist.
Osmanabad
Mr. Khade N.P., Executive
Engineer
Dt 15/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
PHC Terkheda Dist.
Osmanabad
Mr. Khade N.P., Executive
Engineer
Dt 15/12/2018
Necessary Instructions
Given about Maintaining
Good Quality of
Construction Works,
Taking Various Quality
Test Reports of Building
Material and
Concrete,Curring to IDW
Staff with State office
Team.
IDW Staff Z.P.
Nanded
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Jalkot BlockDr G G Parge, Dist Health
Officer, Latur 20/12/2018MR Campain Review Facility Yes Facility level
Ahmedpur BlockDr G G Parge, Dist Health
Officer, Latur 22/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Udgir BlockDr G G Parge, Dist Health
Officer, Latur 22/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
Udgir BlockDr G G Parge, Dist Health
Officer, Latur 29/12/2018
MR Campain Review,
PHC VisitFacility Yes Facility level
THO Shirur ADr Dhange C R, ADHO,
Latur 1/11/2018PHC THO Visit Facilty Yes Facility Level
PHC PangaonHemant Salunke DPM,
Latur 11/12/2018
DHIS2, RCH Portal,
Biometric & Exp ReviewFacilty Yes Facility Level
PHC Kingaon, THO
Ahmedpur
Hemant Salunke DPM,
Latur 17/12/2018
DHIS2, RCH Portal,
Biometric & Exp ReviewFacility Yes Facility level
PHC HerHemant Salunke DPM,
Latur 18/12/2018
Kayakalpa Peer
AssessmentFacility Yes Facility level
PHC BorolHemant Salunke DPM,
Latur 24/12/2018
Kayakalpa Peer
AssessmentFacility Yes Facility level
PHC PangaonHemant Salunke DPM,
Latur 11/12/2018
DHIS2, RCH Portal,
Biometric & Exp ReviewFacilty Yes Facility Level
PHC PangaonMangesh Randive DMEO,
Latur 11/12/2018
DHIS2, RCH Portal,
Biometric & Exp ReviewFacilty Yes Facility Level
HadoltiMangesh Randive DMEO,
Latur 13/12/2018
DHIS2, RCH Portal,
Biometric & Exp ReviewFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 15/12/2018MR Campain Facilty Yes Facility Level
PHC KingaonMangesh Randive DMEO,
Latur 17/12/2018MR Campain Facilty Yes Facility Level
District Latur - ADHO
District Latur - DPM
District Latur - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Udgir BlockMangesh Randive DMEO,
Latur 18/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 19/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 20/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 21/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 26/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
Ausa BlockMangesh Randive DMEO,
Latur 26/12/2018
MR Campain Review,
PHC VisitFacilty Yes Facility Level
SDH Nilanga
1.Laqushya Assesment
2.HLL and Faber Reporting
Format Discussion
3.NBSU and BSU Checking
Puja P Patil IPHS CO
04/12/2018
1.Laqushya Assesment
Done.
2.HDU Set-up
Discussion With MS sir.
3.Planning regarding
New NBSU Set-up and
Expediture under NBSU.
4.No blood Bags In BSU
Facility
PHC Borol
1.Kayakalp Assesment
2.HLL and Faber Reporting
Format Discussion
Puja P Patil IPHS CO
06/12/2018
1.Kayakalp Assesment
Done.
2.HLL and Faber
Reporting format
Facility
RH Deoni
1.Kayakalp and NQAS
Assesment
2.No Bedsheets was
available on any bed
3.BMW is not as per
Guidelines
4.Warmer not available
Puja P Patil IPHS CO
06/12/2018
1.Assesment done and
told the identified gaps.
2.Told to on duty staff
for making proper Bed
with Bedsheets.
3.Guidelines told
regardning BMW.
Facility
WH Latur
1.Kayakalp Assesment
2.Expenditure under SNCU
is Less
3.Budget requirement for
CPS.
4.HLL and Faber Reporting
Format Discussion
Puja P Patil IPHS CO
10/12/2018
1.Kayakalp Assesment
2.Discussion regardning
Expenditure under
SNCU
3.Budget requirement for
CPS.
4.HLL and Faber
Reporting Format
Discussion
Facility
District Latur - IPHS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Nalegaon
1.Kayakalp Assesment
2.HLL and Faber Reporting
Format Discussion
3.Information given about
budget for cleaning and
laundry.
Puja P Patil IPHS CO
11/12/2018
1.Kayakalp Assesment
2.HLL and Faber
Reporting Format
Discussion
3.Information given
about budget for cleaning
and laundry.
Facility
PHC Her
1.Kayakalp Assesment
2.HLL and Faber Reporting
Format Discussion
3.Information given about
budget for cleaning and
laundry.
Puja P Patil IPHS CO
11/12/2018
1.Kayakalp Assesment
2.HLL and Faber
Reporting Format
Discussion
3.Information given
about budget for cleaning
and laundry.
Facility
RH Ausa
1.Kayakalp Assesment
2.HLL and Faber Reporting
Format Discussion
3.BSU and NBSU Checking
Puja P Patil IPHS CO
15/12/2018
1.Kayakalp Assesment
2.HLL and Faber
Reporting Format
Discussion
3.No trained MO
available for BSU letter
already sent from distrcit
level for traning of MO.
Facility
PHC Lamjana
1.Kayakalp Assesment
2.HLL and Faber Reporting
Format Discussion
3.Information given about
budget for cleaning and
laundry.
Puja P Patil IPHS CO
15/12/2018
1.Kayakalp Assesment
2.HLL and Faber
Reporting Format
Discussion
3.Information given
about budget for cleaning
and laundry.
Facility
SDH Umerga and
Tuljapur
Laqushya Re Peer
Assesment
Puja P Patil IPHS CO
21/12/2018
Laqushya Re Peer
Assesment
Facility
SDH Udgir Meeting Arogya MelaPuja P Patil IPHS CO
29/12/2018Meeting Arogya Mela
Facility
PHC Nalegaon Tal
ChakurBF Review Visit
Sangita Davari 18/12/18
(DCM) ASHABF Review Visit Phc leval Yes NO
PHC Pangaon Tal
Renapur
ASHA Monthly Meeting
Attend
Sangita Davari
26/12/18(DCM) ASHA
ASHA Monthly Meeting
Attend & guidance all
attendies about New PIP
Guideline 2018-19 &
Problem Solving at Local
leval
Phc leval Yes NO
PHC Kingaon Tal
Ahamedpur
ASHA Monthly Meeting
Attend
Sangita Davari
26/12/18(DCM) ASHA
ASHA Monthly Meeting
Attend & guidance all
attendies about New PIP
Guideline 2018-19 &
Problem Solving at Local
leval
Phc leval Yes NO
Phc Hasegaon Tal AusaASHA Monthly Meeting
Attend
Sangita Davari
27/12/18(DCM) ASHA
ASHA Monthly Meeting
Attend & guidance all
attendies about New PIP
Guideline 2018-19 &
Problem Solving at Local
leval
Phc leval Yes NO
District Latur - DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Handergully7.12.2018 Kawade S.B. JE
IDW LaturSite Visit
Handergully16.12.2018 Kawade
S.B.DyE IDW LaturSite Visit
Mumbai19.12.2018 Kawade
S.B.DyE IDW LaturMeeting
Handergully, Udgir 25.12.2018 Kawade
S.B.DyE IDW LaturAyush Survey
Mumbai26.12.2018 Kawade
S.B.DyE IDW LaturMeeting
Jawalga Po, Nilanga27.12.2018 Kawade
S.B.DyE IDW LaturSite Visit
DD office12.12.2018 Gayakwad S.T.
JE IDW LaturEtender
Jawalga po18.12.2018 Gayakwad
S.T.JE IDW LaturSite Visit
DD office20.12.2018 Gayakwad
S.T.JE IDW LaturEtender
Kasarbalkunda21.12.2018 Gayakwad S.T.
JE IDW LaturHWC Survey
DD office24.12.2018 Gayakwad S.T.
JE IDW LaturEtender
DD Office3.12.2018 Waghmare
S.J.JE IDW LaturEE Office
DD Office5.12.2018 Waghmare
S.J.JE IDW LaturEE Office
WH Latur7.12.2018 Waghmare
S.J.JE IDW LaturAyush Survey
Halgara, Ambulga 21.12.2018 Waghmare
S.J.JE IDW LaturHWC Survey
DD Office24.12.2018 Waghmare
S.J.JE IDW LaturFor site insepection
Nitur27.12.2018 Waghmare
S.J.JE IDW LaturHWC Survey
Ausa14.12.2018 Patil B.D.JE
IDW LaturODF Survey
Handergully17.12.2018 Patil B.D.JE
IDW LaturFor site insepection
District Latur - Jr.Engineer
District Latur - Jr.Engineer
District Latur - Jr.Engineer
District Latur - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Handergully18.12.2018 Patil B.D.JE
IDW LaturFor site insepection
Ausa19.12.2018 Patil B.D.JE
IDW LaturODF Survey
Handergully21.12.2018 Patil B.D.JE
IDW LaturFor site insepection
Handergully24.12.2018 Patil B.D.JE
IDW LaturFor site insepection
Panchincholi27.12.2018 Patil B.D.JE
IDW LaturHWC Survey
Latur
Attended meeting regarding
MR campaign Z.P.Girls
School,MIDC,LATUR
Dr.Smita S.Wanje NOHP
11/27/2018Recommended & Agreed Facility level by Hon. C.S. yes
RH-Killari
Dental OPD(Oral Health
Screening) in RH-Killari By
Deputation Order
Dr.Smita S.Wanje NOHP
28/11/18Recommended & Agreed Facility level by M.S. yes
DHO office,Latur.Attended Aarogya samiti
baithak at Dho office
Dr.Smita S.Wanje NOHP
03/12/2018Recommended & Agreed
Facility level by president of health
committe yes
RH Renapur
Dental OPD(Oral Health
Screening) in RH-Renapur
By Deputation Order
Dr.Smita S.Wanje NOHP
05/12/2018Recommended & Agreed Facility level by M.S. yes
RH Killari
Dental OPD(Oral Health
Screening) in RH-Killari By
Deputation Order
Dr.Smita S.Wanje NOHP
12/12/2018Recommended & Agreed Facility level by M.S. yes
Latur
Enforcement squad action
against tobacco chewers at
Latur Bus stand and
Railway station by NTCP
&NOHP
Dr.Smita S.Wanje NOHP
12/14/2018 Recommended & Agreed Facility level by Hon. C.S. yes
RH Renapur
Dental OPD(Oral Health
Screening) in RH-Renapur
By Deputation Order
Dr.Smita S.Wanje NOHP
19/12/2018Recommended & Agreed Facility level by M.S. yes
Latur
Enforcement squad
action against tobacco
chewers at Latur Bus stand
and Railway station
by NTCP& NOHP
Dr.Smita S.Wanje NOHP
12/20/2018Recommended & Agreed Facility level by Hon C.S. yes
District Latur -
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Bhavan,Mumbai
Review meeting for all
dentists regarding oral
health programme in
Mumbai.
Dr.Smita S.Wanje NOHP
24/12/2018 Aarogya Recommended & Agreed
Facility level by Hon Deputy
Director Dr.y.p.Muleyyes
RH Killari
Dental OPD(Oral Health
Screening) in RH-Killari By
Deputation Order
Dr.Smita S.Wanje NOHP
26/14/2018Recommended & Agreed Facility level by M.S. yes
PHC Kashar Balkunda Rks Ec & Gb Meeting Girish Kulkarni 15.12.2018 yes Block Level yes No
PHC Kharola & Chapoli Vhnsc Bank Accouant Girish Kulkarni 26.12.2018 yes Block Level yes No
PHc Hasegeon Vhnsc Bank Accouant Girish Kulkarni 31.12.2018 yes Block Level yes No
State Level Traning At
Yashda Pune
DPC Review Meeting And
Traning
Ladekar G N 04/12/18
(DPC PMMVY)
DPC Review Meeting
And Traning State Level Yes No
Mahanagar Palika LaturMeeting At All Uphc Mo
And DEO, ANM
Ladekar G N 12/12/18
(DPC PMMVY)
Meeting At All Uphc Mo
And DEO, ANM District Level Yes No
PHC Nalegaon Tal
ChakurBF Review Visit
Ladekar G N 18/12/18
(DPC PMMVY)BF Review Visit Phc leval Yes NO
Phc Hasegaon Tal AusaASHA Monthly Meeting
Attend
Ladekar G N 27/12/18
(DPC PMMVY)
ASHA Monthly Meeting
Attend & guidance
PMMVY Programme
Phc leval Yes NO
SDH Nilanga
Quality commeetee,BMW
segrigation and disposal,,
quality record keeping
Dr Reddy DQA Cordinator
4/12/18Facility level Yes
PHC Walandi
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
5/12/18Facility level Yes
Rh Deoni
kayakalp ass done,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
6/12/18Facility level Yes
PHC Borol
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
8/12/18Facility level Yes
District Latur - DPC
District Latur - QA Co-ordinator
District Latur -
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
WH Latur
Laqshya commeetee,BMW
segrigation and disposal,,
quality record keeping
Dr Reddy DQA Cordinator
10/10/18Facility level Yes
PHC NALEGAW
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
12/12/18Facility level Yes
PHC HER
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
11/12/18Facility level Yes
PHC Lamjana
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
14/12/18Facility level Yes
Rh Murud
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
15/12/18Facility level Yes
SDH UDGIR
BMW segrigation and
disposal, Record keeping,
clinliness,Labeling of
medicine in pharmacy store,
Hearbal garden
development
Dr Reddy DQA Cordinator
24/12/18Facility level Yes
THO Kallamb
1) NHM Expenditure
Review
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 01/12/2018
Instruction given to MO
& StaffTHO Yes No
SC Wadgaon Si
1) Cleanliness Inside &
Outside SC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 1/12/2018
Instruction given to MO
& StaffMO Yes No
District Osmanabad- DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Pargaon
1) Cleanliness Inside &
Outside PHC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 04/12/2018
Instruction given to MO
& StaffMO Yes No
Asta Kasar,
1) Cleanliness Inside &
Outside SC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 10/12/2018
Instruction given to MO
& StaffMO Yes No
THO Omerga
1) NHM Expenditure
Review
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 10/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Andur
1) Cleanliness Inside &
Outside PHC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 17/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Itkur
1) Cleanliness Inside &
Outside PHC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 19/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Samudrwani
1) Cleanliness Inside &
Outside PHC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 20/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Kond
1) Cleanliness Inside &
Outside PHC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 20/12/2018
Instruction given to MO
& StaffMO Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Dautpur
1) Cleanliness Inside &
Outside SC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 24/12/2018
Instruction given to MO
& StaffMO Yes No
SC Ter
1) Cleanliness Inside &
Outside SC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 24/12/2018
Instruction given to MO
& StaffMO Yes No
THO Kallamb
1) NHM Expenditure
Review
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 25/12/2018
Instruction given to MO
& StaffTHO Yes No
SC Naigaon
1) Cleanliness Inside &
Outside SC
2) Insrutucting given
Regarding incresing Niti
Ayog Indicator & Institute
diliveries
3) RCH Portal Updation
Dr. H.V.Wadgave
( DHO ,osmanabad )
Dt. 25/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Pohaner
1) Verification Niti Ayog
Indicator
2) Insrutucting given
Regarding HMIS data
Quality & DHIS reporting
validation
3) RCH Portal Updation
Shri.K.C.Tandle
(Dist.M&E Officer) Date-
05/12/2018
Instruction given to MO
& StaffMO Yes No
PHC Yedshi
1) Verification Niti Ayog
Indicator
2) Insrutucting given
Regarding HMIS data
Quality & DHIS reporting
validation
3) RCH Portal Updation
Shri.K.C.Tandle
(Dist.M&E Officer) Date-
06/12/2018
Instruction given to MO
& StaffMO Yes No
Yermala-Terkhedayermal phc main bldg.
dismantling started
Mr. Madhukar Deshmukh
(JE) 05/12/2018
Instruction given to MO
& StaffMO Yes no
District Osmanabad- M&E OFFICER
District Osmanabad- Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
mangrul- dahiphal- washimangrul phc measurment,
washi h for survey
Mr. Madhukar Deshmukh
(JE 06/12/2018
Instruction given to MO
& StaffMO Yes no
Yermala PHCto give Marrkout Of Type II
Qtr
Mr. Madhukar Deshmukh
(JE 10/12/2018
Instruction given to MO
& StaffMO Yes no
Terkheda PHCTo see if encroachment is
removed or not
Mr. Madhukar Deshmukh
(JE 11/12/2018
Instruction given to MO
& StaffMO Yes No
Terkheda PHCPresent at work to remove
encroachment
Mr. Madhukar Deshmukh
(JE12/12/2018
Instruction given to MO
& StaffMO Yes No
Yermala PHCto give Marrkout Of main
bldg
Mr. Madhukar Deshmukh
(JE 13/12/2018
Instruction given to MO
& StaffMO Yes No
yermal- terkheda
yrmala phc excavation in
progress & slab steel of
terkeda
Mr. Madhukar Deshmukh
(JE 15/12/2018
Instruction given to MO
& StaffMO Yes No
Terkheda PHCpresent at site terkheda phc
for slab casting
Mr. Madhukar Deshmukh
(JE 17/12/2018
Instruction given to MO
& StaffMO Yes No
Terkheda PHCpresent at site terkheda phc
for slab casting
Mr. Madhukar Deshmukh
(JE18/12/2018
Instruction given to MO
& StaffMO Yes No
Yermala PHC Site Visit Mr. Madhukar Deshmukh
(JE 19/12/2018
Instruction given to MO
& StaffMO Yes No
kond phc
visit with DHO Sir to
completed construction of
phc
Mr. Madhukar Deshmukh
(JE 20/12/2018
Instruction given to MO
& StaffMO Yes No
moha-dahiphal-Itkur-
bhoom-jawala-walwad-
Anala-Shelgaon-Assu
to survey HWC PHC for
faced branding esimate with
Jr.Enng Mr. Waghmare
Mr. Madhukar Deshmukh
(JE 26/12/2018
Instruction given to MO
& StaffMO Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Kanegaon- lohara- makni-
Jewali- Andur- Katgaon-
Sawargaon
to survey HWC PHC for
faced branding esimate with
Jr.Enng Mr. Waghmare
Mr. Madhukar Deshmukh
(JE 27/12/2018
Instruction given to MO
& StaffMO Yes No
Lohara THO, Tuljapur
1.PMMY target completion
suggections given
2. PMMYbeneficiary
should not be missed from
benefit of scheme 3. 2nd &
3 rd Instalment Due And so
Pendency should not be at
tulaka level .
Atul S.Poul (PMMVY
NHM ) Dt 10/12/2018
Instuction given to Hon
.THO & MO & PHC
staff
THO Level by PHC, MO. Yes No
Bhoom THO,
.1.PMMVY target
completion suggections
given 2. PMMVY
beneficiary should not be
missed from benefit of
scheme 3. sukanu semiti
meeting should conducted
on monthly basis & report
to District office .4. 2nd & 3
rd Instalment Due And so
Pendency should not be at
tulaka level .
Atul S.Poul (PMMVY
NHM ) Dt 12/12/2018
instuction given to
Hon.THO, MO, PHC
staff
THO Level by PHC, MO Yes No
Washi THO,
1. 2nd & 3 rd Instalment
Due And so Pendency
should not be at tulaka level
2.. PMMVYbeneficiary
should not be missed from
benefit of scheme
3..PMMVY target
completion suggections
given. .4.sukanu semiti
meeting should conducted
on monthly basis & report
to District office.
Atul S.Poul (PMMVY
NHM ) Dt 13/12/2018
instuction given toTHO
& MO Hospital staff THO Level by PHC, MO. Yes No
Kalamb THO,
1. PMMVY target
completion suggections
given 2. 2nd & 3 rd
Instalment Due And so
Pendency should not be at
tulaka level .3.sukanu
semiti meeting should
conducted on monthly basis
& report to District office.
Atul S.Poul (PMMVY
NHM ) Dt 14/12/2018
instuction given to
Hon.THO, MO, PHC
staff
THO Level by PHC, MO. Yes No
District Osmanabad- DCP
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Kalamb Pchyat Samiti,
1. PMMVYbeneficiary
should not be missed from
benefit of scheme
2..PMMVY target
completion suggections
given. .3.sukanu semiti
meeting should conducted
on monthly basis & report
to District office 4. 2nd
& 3 rd Instalment Due And
so Pendency should not be
at tulaka level. Taluka
Kalamb & Washi Block
Meeting all Taluka Staff
Instruction Givan to Pmmvy
Schemes.
Atul S.Poul (PMMVY
NHM ) Dt 25/12/2018instuction given to THO
THO Level by PHC
MO,LHV,HA,ANM &BF, . Yes No
Lohara THO,
1. PMMVY target
completion suggections
given . 2.sukanu semiti
meeting should conducted
on monthly basis & report
to District office .3. 2nd & 3
rd Instalment Due And so
Pendency should not be at
tulaka level .
Atul S.Poul (PMMVY
NHM ) Dt 28/12/2018
instuction given to
Hon.THO, MO, PHC
staff
THO Level by PHC, MO. Yes No
Lohara THO,
1. PMMVY target
completion suggections
given 2. 2nd & 3 rd
Instalment Due And so
Pendency should not be at
tulaka level .Taluka Lohara
Block Meeting Instruction
Givan to Pmmvy Schemes..
Atul S.Poul (PMMVY
NHM ) Dt 31/12/2018
instuction given to
Hon.THO,staff
THO Level by PHC, LHV,HA
ANM & BF. Yes No
Mangrul (K) PHC,
Dahiphal Phc ,& Washi
RH
.1.visited to RH washi
regarding ODF programme
activity.2.instruction given
for Gap filling 3. PHC visit
for NQAS & kayakalp
activity monitoring
Dr. S.V.Aher (DQA NHM
) Dt 06/12/2018
instuction given to MS &
Hospital staff RH Level by MS, PHC level by MO yes no
Aasu PHC & Walwad
PHC
1visit for kayakalp Final
assessment with Team
2.instruction given for Gap
filling as per kayakalp
checklist
Dr. S.V.Aher (DQA NHM
) Dt 20 /12/2018
instuction given to MO
& Hospital staff PHC level by MO yes no
District Osmanabad- QA Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Omerga SDH & Tuljapur
SDH
1. visit for kayakalp peer
assessment with DD cirlce
latur team 2.Instruction
given for Gap filling as per
kayakalp checklist
Dr. S.V.Aher (DQA NHM
) Dt 21/12/2018
instuction given to MS &
Hospital staff SDH level by MS yes no
Savargaon PHC & Jalkot
PHC
1visit for kayakalp Final
assessment with Team
2.instruction given for Gap
filling as per kayakalp
checklist
Dr. S.V.Aher (DQA NHM
) Dt 24/12/2018
instuction given to MO
& Hospital staff PHC level by MO yes no
Mangrul (K) PHC
1visit for kayakalp Final
assessment with Team
2.instruction given for Gap
filling as per kayakalp
checklist
Dr. S.V.Aher (DQA NHM
) Dt 26/12/2018
instuction given to MO
& Hospital staff PHC level by MO yes no
Keshegaon PHC
1visit for kayakalp Final
assessment with Team
2.instruction given for Gap
filling as per kayakalp
checklist
Dr. S.V.Aher (DQA NHM
) Dt 27/12/2018
instuction given to MO
& Hospital staff PHC level by MO yes no
Dahiphal PHC &
Mankeshwar PHC
1visit for kayakalp Final
assessment with Team
2.instruction given for Gap
filling as per kayakalp
checklist
Dr. S.V.Aher (DQA NHM
) Dt 28/12/2018
instuction given to MO
& Hospital staff PHC level by MO yes no
PHC ChousalaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office patoda
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC KadaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office Beed
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC UmapurPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC ChaklambaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office GeoraiTHO office meeting, visits
& Measles & Rubella
THO office meeting,
visits & Measles &
Rubella
Block/Facility Yes No
THO Office MajalgaonTHO office meeting, visits
& Measles & Rubella
THO office meeting,
visits & Measles &
Rubella
Block/Facility Yes No
District Beed - DHO
DHO Dr.
R. B. Pawar Date :-
04.12.2018
DHO Dr.
R. B. Pawar Date :-
05.12.2018
DHO Dr.
R. B. Pawar Date :-
06.12.2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC GangamaslaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC PatrudPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office Wadwani
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
THO Office ParaliHon. Gardian Minister
Meeting
Hon. Gardian Minister
MeetingBlock/Facility Yes No
PHC UjaniPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
Village mahendrawadiVisit of Mahendrawadi
about MR
Visit of Mahendrawadi
about MRBlock/Facility Yes No
Village GarmathaVisit of Garmatha about
MR
Visit of Garmatha about
MRBlock/Facility Yes No
SC Pimpalwandi SC visit SC visit Block/Facility Yes No
PHC DhamangaonPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office Georai
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
SC Doethan SC visit SC visit Block/Facility Yes No
THO Office Beed
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
THO Office WadwaniTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
PHC KuppaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC BhogalwadiPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office DharurTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
Parali
Maha Arogya Shibir at
Gopinathgad preparation
visit
DHO Dr.
R. B. Pawar Date :-
11.12.2018
Maha Arogya Shibir at
Gopinathgad preparation
visit
Block/Facility Yes No
SC Pangri SC visit
DHO Dr.
R. B. Pawar Date :-
12.12.2018
SC visit Block/Facility Yes No
THO Office BeedTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
PHC Dharmapuri
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC Ujani
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
DHO Dr.
R. B. Pawar Date :-
08.12.2018
DHO Dr.
R. B. Pawar Date :-
09.12.2018
DHO Dr.
R. B. Pawar Date :-
10.12.2018
DHO Dr.
R. B. Pawar Date :-
13.12.2018
DHO Dr.
R. B. Pawar Date :-
06.12.2018
DHO Dr.
R. B. Pawar Date :-
07.12.2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC MadalmohiPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC Nipani JawalkaPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC DhamangaonPHC Visit and Supervision
of Measles & Rubella
DHO Dr.
R. B. Pawar Date :-
15.12.2018
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
Pune Meeting at Pune Meeting at Pune Block/Facility Yes No
PHC Khunthefal
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC Amalner
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC NalwandiPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
PHC PimpalnerPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
THO Office BeedTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
PHC TakalsingPHC Visit and Supervision
of Measles & Rubella
PHC Visit and
Supervision of Measles
& Rubella
Block/Facility Yes No
SC loni SC visit SC visit Block/Facility Yes No
SC Savargaon SC visit SC visit Block/Facility Yes No
Village nandur SC visit SC visit Block/Facility Yes No
THO Office AshtiTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
THO Office kaijTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
PHC ChincholimaliPHC Visit and Review all
national programs
PHC Visit and Review
all national programsBlock/Facility Yes No
PHC yousuf wadgaonPHC Visit and Review all
national programs
PHC Visit and Review
all national programsBlock/Facility Yes No
PHC BardapurPHC Visit and Review all
national programs
DHO Dr.
R. B. Pawar Date :-
21.12.2018
PHC Visit and Review
all national programsBlock/Facility Yes No
THO Office AmbajogaiTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
PHC BhavthanaPHC Visit and Review all
national programs
PHC Visit and Review
all national programsBlock/Facility Yes No
THO Office DharurTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
DHO Dr.
R. B. Pawar Date :-
17.12.2018
DHO Dr.
R. B. Pawar Date :-
18.12.2018
DHO Dr.
R. B. Pawar Date :-
19.12.2018
DHO Dr.
R. B. Pawar Date :-
21.12.2018
DHO Dr.
R. B. Pawar Date :-
14.12.2018
DHO Dr.
R. B. Pawar Date :-
16.12.2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC DharmapuriPHC Visit and Review all
national programs
PHC Visit and Review
all national programsBlock/Facility Yes No
THO Office ParaliTHO office meeting, visits
& review MR programs
THO office meeting,
visits & review MR
programs
Block/Facility Yes No
Mumbai Meeting at Mumbai
DHO Dr.
R. B. Pawar Date :-
23.12.2018
Meeting at Mumbai Block/Facility Yes No
PHC Suleman DeolaPHC Visit and Review all
national programs
PHC Visit and Review
all national programsBlock/Facility Yes No
SC Savargaon SC visit SC visit Block/Facility Yes No
Village Dhanora SC visit SC visit Block/Facility Yes No
THO Office Parali
THO office meeting, visits
& review all national
programs & Hon. Gardian
Minister meeting
DHO Dr.
R. B. Pawar Date :-
28.12.2018
THO office meeting,
visits & review all
national programs &
Hon. Gardian Minister
meeting
Block/Facility Yes No
THO Office Shirur
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
THO Office Beed
THO office meeting, visits
& review all national
programs
THO office meeting,
visits & review all
national programs
Block/Facility Yes No
PHC Suleman DeolaPHC Visit and Review all
national programs
DHO Dr.
R. B. Pawar Date :-
30.12.2018
PHC Visit and Review
all national programsBlock/Facility Yes No
MumbaiPanchayat Raj committee
meeting at Mumbai
DHO Dr.
R. B. Pawar Date :-
31.12.2018
Panchayat Raj committee
meeting at MumbaiBlock/Facility Yes No
Bhodka Village/AW RI Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
RI Session
Hingni Village/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
MR Session
Amla Village/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
MR Session
Limla Village/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
MR Session
Koyal Village/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
MR Session
Longaon Village/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 07-12-
2018
MR Session
Wadwani Village/ AW MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
Morwad Village/AW MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
Babi Village/AW MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
Telgaon AW 1 MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
Telgaon AW 2 MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
DHO Dr.
R. B. Pawar Date :-
29.12.2018
District Beed - M&E OFFICER
DHO Dr.
R. B. Pawar Date :-
22.12.2018
DHO Dr.
R. B. Pawar Date :-
25.12.2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Telgaon AW 3/School MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
Sunder Nager Telgaon
Suger Factory MR Session
Dist. M&E Officer
L.S.Kulkarni Date- 20-12-
2018
MR Session
22. SDH Parli
IPHS Co-ordinator Smt.
Ghungrad J. B. Date :-
11/12/2018
SDH Parali Shibir
23. SDH Parli
IPHS Co-ordinator Smt.
Ghungrad J. B. Date :-
12/12/2018
SDH Parali Shibir
24. SDH Parli
IPHS Co-ordinator Smt.
Ghungrad J. B. Date :-
13/12/2018
SDH Parali Shibir
SDH Georai
vkjch,lds iFkdkapk vk<kok
o vkjksX; rikl.kh o lanHkZ
lsokpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d]Jherh t;Jh ?kaqxjM
vk;-ih-,p-,l-leUo;d o Jh
lkj.khdj ,- bZ-,e-,l-
leUo;d
fn-04-12-2018
vkjchj,lds iFkdkaP;k
eklhd vk<kok lanHkkZr
ekfgrh ?ks.;kr vkyh- lanHkZ
lsok f'kchj ?ks.;kr ;sbZy
vls lkax.;kr vkys-izR;sd
vkjch,lds P;k okgukyk
yksxks yko.;kckcr ppkZ
dj.;kr vkyh-rlsp ,e-
vkj-ylhdj.kklkBh 'kkgq
fo|ky; xsojkbZ ;sFks izR;{k
HksV nsmQu ikg.kh dj.;kr
vkyh-
District, Block, Facility Yes No
RH Majalgaon
vkjch,lds iFkdkapk vk<kok
o vkjksX; rikl.kh o lanHkZ
lsokpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-05-12-2018
vkjchj,lds iFkdkaP;k
eklhd vk<kok lanHkkZr
ekfgrh ?ks.;kr vkyh rlsp-
uksOgscj 2018 Ik;Zar lnjhy
iFkdkaps eku/ku ns.;kr
vkysys vkgsr- lnjhy
iFkdkauk ns.;kr vkysys
yWiVkWi pkaxY;k izdkjps
vkgsr- rlsp uohu vgoky
iQkWjeWV ckcr ppkZ
dj.;kr vkyh-arlsp ,e-
vkj-ylhdj.k dfjrk ,dk
iFkdkayk HksV ns.;kr vkyh-
R;kfBdk.kh MkW-ukxjxksts gs
,e-vkj- ylhdj.kklkBh
jktekrk fo|ky;kr ,e-
vkj-ylhdj.k pkyq gksrs-
District, Block, Facility Yes No
District Beed - IPHS Co-ordinator
District Beed - RBSK Co.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Dharur
vkjch,lds iFkdkapk vk<kok
o vkjksX; rikl.kh o lanHkZ
lsokpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-06-12-2018
vkjchj,lds iFkdkaP;k
eklhd vk<kok lanHkkZr
ekfgrh ?ks.;kr vkyh-
rkyqdk vkjksX; vf/kdkjh
;kaP;k lkscr tkmQu
Kkunhi fo|ky;kr ,e-vkj-
ylhdj.kkph eksBh eksghe
pkyq gksrh R;k fBdk.kh
tkmQu ppkZ dj.;kr
vkyh-
District, Block, Facility Yes No
SDH Kaij
vkjch,lds iFkdkapk vk<kok
o vkjksX; rikl.kh o lanHkZ
lsokpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] o Jh lkj.khdj ,-
bZ-,e-,l- leUo;d
fn-07-12-2018
vkjchj,lds iFkdkaP;k
eklhd vk<kok lanHkkZr
ekfgrh ?ks.;kr vkyh rlsp
uksOgsacj 18 Ik;Zar lnjhy
iFkdkaps eku/ku ns.;kr
vkysys vkgsr- oS|fd;
vf/k{kd ;kaph HksV gkmQ
'kdyh ukgh rlsp MkW-
eksjkGs ;kaps lkscr uqjtgkW
fo|ky;kr ylhdj.k pkyq
gksrs-R;kfBdk.kh tkmQu
ikg.kh dsyh vlrk R;k
'kkGsr ,dq.k 450 ykHkkFkhZ
iSfd iQdr 65
ykHkkF;kZkuhp ,e-vkj-
ylhdj.k djQu ?ksrys-
vls fun'kZkukl vkys-
District, Block, Facility Yes No
RH Chinchwan
vkjch,lds iFkdkapk vk<kok
o vkjksX; rikl.kh o lanHkZ
lsokpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-08-12-2018
ek-eq[; dk;Zdkjh vf/kdkjh
;kauh fnysY;k lqpusuqlkj
izR;sd efgU;kP;k 8
rkj[ksyk vkjch,lds ;k
dk;Zdzekph rkyqdkLrjh;
vk<kok cSBd ?ks.ks ckcr
lqpuk ns.;kr vkysY;k
gksR;k-R;kvuq"kaxkus xzkeh.k
jQX.kky;]fpapo.k ;sFks
izR;{k vk<kok cSBfdyk
mifLFkr jkgqu vk<kok o
ekxZn'kZu dj.;kr vkys-
District, Block, Facility Yes No
SDH Parli xksihukFk xM ikaxjh
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-11-12-2018
Lo-xksihukFk eqaMs ;kaP;k
ok<fnolkfuehRr egk
vkjksX; esGkO;kP;k fu;kstu
dj.;kr lkBh R;k fBdk.kh
HksV nsmQu vk<ok ?ks.;kr
vkyk-
District, Block, Facility Yes No
SDH Parli xksihukFk xM ikaxjh
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-13-12-2018
Lo-xksihukFk eqaMs ;kaP;k
ok<fnolkfuehRr egk
vkjksX; esGkO;kP;k fu;kstu
dj.;kr lkBh R;k fBdk.kh
izR;{k esGkO;k e/;s vkjksX;
rikl.kh dj.;kr vkyh-
District, Block, Facility Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH Parli vkjksX; foHkxkpk vk<kok
Jh- rkaxMs vkj-ds vkjch,lds
leUo;d] Jh lkj.khdj ,- bZ-
,e-,l- leUo;d
fn-28-12-2018
ek-ikydea_kh iadtkrkbZ
eqaMs ;kaP;k v/;{krs[kkyh
vkjksX; o f'k{k.k foHkxkpk
vk<kok ?ks.;kr vkyk-
R;ke/;s eqyhpk tUe nj
ok<ysYkk fnlqu vkyk o
bZrj o xaHkhj 'kL_kfdz;kps
izek.k ok<ysys fnlqu vkys-
rlsp cka/kdke foHkkxkpk
vk<kok ?ks.;kr vkyk
R;ke/;s uohu cka/kdke ekgs
ekpZ 2019 v[ksj iq.kZ
dj.;kr ;kos v'kkk lqpuk
ns.;kr vkY;k-
District, Block, Facility Yes No
PHC Sonkhed Taluka Loha
1. Check the record 2014 -
15 to 2016-17 RKS Mo
PHC account
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit 4.Concurrent audit not
done
Junaid Saleem,
District Program Manager
Nanded Date :-
03/12/2018
11. Check the record
2014 -15 to 2016-17
RKS Mo PHC account
2. payement of activity
has not done by PFMS.
3. compliences of
Statutory audit
4.Concurrent audit not
done
PHC Level By MO Yes No
PHC Manjaram Taluka
Naigaon
1. Check the record 2014 -
15 to 2016-17 RKS Mo
PHC account
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit 4.Concurrent audit not
done
Junaid Saleem,
District Program Manager
Nanded Date :-
26/12/2018
11. Check the record
2014 -15 to 2016-17
RKS Mo PHC account
2. payement of activity
has not done by PFMS.
3. compliences of
Statutory audit
4.Concurrent audit not
done
PHC Level By MO Yes No
PHC Manjaram Taluka
Naigaon
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit
Junaid Saleem,
District Program Manager
Nanded Date :-
28/12/2018
1. payement of activity
has not done by PFMS.
2. compliences of
Statutory audit
MMU Level By MO Yes No
PHC Sonkhed Taluka
Loha
1. Check the record 2014 -
15 to 2016-17 RKS Mo
PHC account
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit 4.Concurrent audit not
done
Mr. Chaudhari B R
DAM Nanded Date
:- 03/12/2018
11. Check the record
2014 -15 to 2016-17
RKS Mo PHC account
2. payement of activity
has not done by PFMS.
3. compliences of
Statutory audit
4.Concurrent audit not
done
PHC Level By MO Yes No
District Nanded - DPM
District Nanded - DAM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Manjaram Taluka
Naigaon
1. Check the record 2014 -
15 to 2016-17 RKS Mo
PHC account
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit 4.Concurrent audit not
done
Mr. Chaudhari B R
DAM Nanded
Date :- 26/12/2018
11. Check the record
2014 -15 to 2016-17
RKS Mo PHC account
2. payement of activity
has not done by PFMS.
3. compliences of
Statutory audit
4.Concurrent audit not
done
PHC Level By MO Yes No
MMU Umri Taluka
Umri
2. payement of activity has
not done by PFMS.
3. compliences of Statutory
audit
Mr. Chaudhari B R
DAM Nanded Date
:- 28/12/2018
1. payement of activity
has not done by PFMS.
2. compliences of
Statutory audit
MMU Level By MO Yes No
PHC Sonkhed Taluka
LohaPulse Polio Visit
Mr. Kamble A.B.
District M & E Officer
Nanded Date :-
03/12/2018
1) DHIS Validation
Commity not Conduct
every month. Instruction
given to impliment
meeting every month 2)
maintain both files for
DHIS 2 Online and hard
copy. 3) RCH Regi.
Verify and and portal
data entry 100 EC
complited before 10
Every Month
PHC Level By MO Yes No
PHC Manjaram Taluka
Naigaon
Reproductive Health/
Family Planning
Maternal Health
Newborn Health Child
Health Adolescent Health
Mr. Kamble A.B.
District M & E Officer
Nanded
Date :- 26/12/2018
1) DHIS Validation
Commity not Conduct
every month. Instruction
given to impliment
meeting every month 2)
maintain both files for
DHIS 2 Online and hard
copy. 3) RCH Regi.
Verify and and portal
data entry 100 EC
complited before 10
Every Month
PHC Level By MO Yes No
MMU Umri Taluka
Umri
Reproductive Health/
Family Planning
Maternal Health
Newborn Health Child
Health Adolescent Health
Mr. Kamble A.B.
District M & E Officer
Nanded Date :-
28/12/2018
1) DHIS Validation
Commity not Conduct
every month. Instruction
given to impliment
meeting every month 2)
maintain both files for
DHIS 2 Online and hard
copy. 3) RCH Regi.
Verify and and portal
data entry 100 EC
complited before 10
Every Month
MMU Level By MO Yes No
District Nanded - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Khanapur Taluka
DegloorI.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 05/12/2018
Brick Work in Prog.
Type 2nd plan, Check
about Line, Level and
Joints. Instruction given
to JE
District Yes No
PHC Mukramabad
Taluka MukhedI.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 05/12/2018
Main Building centering
work in prog. Must be
Level and Line.
Instruction given to JE
District Yes No
SC Pimpalgaon Taluka
ArdhapurI.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 06/12/2018
Checking about
Electrical work, wiring
and level of Patti,
District Yes No
SC Tadkhel Taluka
DegloorI.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 10/12/2018
SC finishing work in
final stage about coloring
and cliness Instruction
given to JE and
Contractor
District Yes No
PHC Sonkhed Taluka
LohaI.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 12/12/2018
Water supply work in
final stage. Instruction
given about Pipeline and
fixing of pannel bord in
properway. Instrctution
given to JE and
contractor
District Yes No
RH Loha Taluka Loha I.D.W.
Mr. Jadhav A B
(Dy. Engg.)
Date:- 20/12/2018
Water supply work in
final stage. Instruction
given about Pipeline and
fixing of pannel bord in
properway. Instrctution
given to JE and
contractor
District Yes No
RH Loha Taluka Loha
1. PFMS software entry is
very low 2. Concurrent
Audit 1 and 2 quarter
compliences not Submitted
3. NHM account and RKS
ac banck reconsillation
statement not prepare
Mr. Sawade Datta BFO
Nanded Date :- 02-
12-2018
1. give training about
PFMS Software and
suggest to give benefit to
all benificiary by PFMS
only.
2. :Prepare the
compliences of Audit
paras and submit
urgently.
3. suggest to prepare
BRS emidiatly and
monthly
RH Level By MS Yes No
RH Naigaon Taluka
Naigaon
1. PFMS software entry is
very low 2. Concurrent
Audit 1 and 2 quarter
compliences not Submitted
3. NHM account and RKS
ac banck reconsillation
statement not prepare
Mr. Sawade Datta BFO
Nanded Date :-
26-12-2018
1. give training about
PFMS Software and
suggest to give benefit to
all benificiary by PFMS
only.
2. :Prepare the
compliences of Audit
paras and submit
urgently.
3. suggest to prepare
BRS emidiatly and
monthly
RH Level By MS Yes No
District Nanded - Dy.Engineer
District Nanded - BFO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Umri Taluka
Umri
1. PFMS software entry is
very low 2. Concurrent
Audit 1 and 2 quarter
compliences not Submitted
3. NHM account and RKS
ac banck reconsillation
statement not prepare
Mr. Sawade Datta BFO
Nanded Date :- 28-
12-18
1. give training about
PFMS Software and
suggest to give benefit to
all benificiary by PFMS
only.
2. :Prepare the
compliences of Audit
paras and submit
urgently.
3. suggest to prepare
BRS emidiatly and
monthly
RH Level By MS Yes No
PHC ARdhapur Taluka
Loha
1) ILR defrizer regular
temp. maintenande
2) Biometric machine is off
3) biomedical equipment
register
Mr. T.B. Kulkarni Nanded
Date :- 07/12/2018
action are recommended
to MO PHC
and staff of the PHC
PHC Level By MO Yes No
KINWAT BLOCKPULSE POLIO ROUND
2ND
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:04/12/2018
PULSE POLIO ROUND
2ND_ _ Institute
RH DHARMABAD
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT PREPARED 3)
STAFF TRAINING IS
INADEQUET
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:06/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL SUPERINTENDENT
AND HIS TEAM
_ Institute
PHC KARKHELI
1) BMW 2016 RULES
NOT FOLLOWING 2)
CLEANING IS
INADEQUET IN THE
HOSPITAL, 3) STAFF
TRAINING IS REMAINED
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:06/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
RH BILOLI
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT UPDATED 3) IEC
REGARDING WATER
CONSERVATION IS NOT
SEEN
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:06/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL SUPERINTENDENT
AND HIS TEAM
_ Institute
PHC SINDHI
1) BMW 2016 RULES
NOT FOLLOWING 2)
CLEANING IS
INADEQUET IN THE
HOSPITAL, 3) STAFF
TRAINING IS REMAINED
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:06/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
District Nanded -
District Nanded - QA Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH UMARI
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT SEEN 3)STAFF
TRAINING UNDER
KAYAKALP IS
INADEQUET
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:06/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
PHC KOLI
1) BMW 2016 RULES
NOT FOLLOWING 2)
CLEANING IS
INADEQUET IN THE
HOSPITAL, 3) STAFF
TRAINING IS REMAINED
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:07/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
PHC BARADSHEWALA
1) BMW 2016 RULES
NOT FOLLOWING 2)
CLEANING IS
INADEQUET IN THE
HOSPITAL, 3) STAFF
TRAINING IS REMAINED
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:07/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
PHC ARDHAPUR
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT UPDATED 3) IEC
REGARDING WATER
CONSERVATION IS NOT
SEEN
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:11/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
PHC MALEGAON
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT UPDATED 3) IEC
REGARDING WATER
CONSERVATION IS NOT
SEEN
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:11/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
PHC BHOSI
1) BMW SEGRAGATION
IS NOT PROPER 2)
CLEANING CHARTS
NOT UPDATED 3) IEC
REGARDING WATER
CONSERVATION IS NOT
SEEN
DR. SAIPRASAD SHINDE
DQAC, NANDED
DATE:11/12/2018
INSTRUCTIONS ARE
GIVEN TO CORRECT
NECESSARY
ACTIONS IN NEXT 15
DAYS
INSTITUTE LEVEL BY
MEDICAL OFFICER AND HIS
TEAM
_ Institute
District Nanded - EMS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Nanded SGGS
1)Glucostrips,IV NS
fluids,Dopamaine,noradrena
line,hydrocortisone,frusami
de,dexamethasone,
Naloxone HCL, sup. PCM,
tab. Isosorbirate, asprine
are not available
2)Poratable oxygen cylinder
submitted to BME, Foetal
dopler ,Pupillary torch,BP
apparatus search light are
not working
3)cotton Bandages all sizes,
surgical gloves & adhesive
tapes, disposable vomiting
bags are not avaialble
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 07/12/2018
1)Glucostrips,IV NS
fluids,Dopamaine,noradr
enaline,hydrocortisone,fr
usamide,dexamethasone,
Naloxone HCL, sup.
PCM, tab. Isosorbirate,
asprine are not available
2)Poratable oxygen
cylinder submitted to
BME, Foetal dopler
,Pupillary torch,BP
apparatus search light are
not working
3)cotton Bandages all
sizes, surgical gloves &
adhesive tapes,
disposable vomiting bags
are not avaialble
DM MEMS YesDM MEMS
Level
Dharmabad RH
1)antiseptic sloution, inj.
Adrenaline, cal. Gluconate,
NTG,diazepam/ midazolam,
MgSO4,Tab. Isosorbitrate,
Amlodepine are not
available
2)Delivery
kit,Leucoplst,binasal canula,
tringular bandages,teeth
guards, cold packs, sample
collection tubes.
3)siren, AC & invertor is
not working
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 12/12/2018
1)antiseptic sloution, inj.
Adrenaline, cal.
Gluconate,
NTG,diazepam/
midazolam, MgSO4,Tab.
Isosorbitrate,
Amlodepine are not
available
2)Delivery
kit,Leucoplst,binasal
canula, tringular
bandages,teeth guards,
cold packs, sample
collection tubes.
3)siren, AC & invertor is
not working
MO PHC Ardhapur & DM MEMS Yes
DM MEMS
Level & MO
Level
Biloli RH
1)IV D5, Inj.Dobutamine,
NTG,Hydrocortisone,midas
olam,dexamethasone,amnia
darone,Mg So4, syr
PCM,tab. Isosorbitrate &
Amlodepine are not
available
2)glucometer showing error
3)triangular
bandages,vomiting bags are
not available
vomiting bags
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 12/12/2018
1)IV D5,
Inj.Dobutamine,
NTG,Hydrocortisone,mi
dasolam,dexamethasone,
amniadarone,Mg So4,
syr PCM,tab.
Isosorbitrate &
Amlodepine are not
available
2)glucometer showing
error
3)triangular
bandages,vomiting bags
are not available
vomiting bags
DM MEMS NoDM MEMS
Level
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Umri RH ( Dh premices)
1)inj. Dopamine,
noradrenaline,
Dexamethasone,MgSO4,IV
D5,inj. Amiadarone, tab.
Amlodepine, are not
available
2)BP apparatus requires
cells, Pupillary torch
3)siren not working
S.A.Kottakondawar
EMS coordinator, Nanded
with ASHKOM team
Dt. 14/12/2018
1)inj.
Dopamine,noradrenaline,
Dexamethasone,MgSO4,
IV D5,inj. Amiadarone,
tab. Amlodepine, are not
available
2)BP apparatus requires
cells, Pupillary torch
3)siren not working
DM MEMS YesDM MEMS
Level
Nanded WH
1)pain & vinodine
spary,inj.adrenaline,
Dopamine,Nordrenaline,NT
G,hydrocortisone,midazola
m,derifyline,amiadarone,
Nalasone HCL, sodium
valporate, tab asprine,
isosorbitrate are not
available
2)BP appratus given for
repair
3) 3 way stop cork, nasal
airways,leucoplast,triangual
ar bandgaes Not available
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 19/12/2018
1)pain & vinodine
spary,inj.adrenaline,
Dopamine,Nordrenaline,
NTG,hydrocortisone,mid
azolam,derifyline,amiada
rone, Nalasone HCL,
sodium valporate, tab
asprine, isosorbitrate are
not available
2)BP appratus given for
repair
3) 3 way stop cork, nasal
airways,leucoplast,triang
ualar bandgaes Not
available
DM MEMS YesDM MEMS
Level
Naigaon RH
1)IV NS not
avaialble,Inj.hydrocortisone,
midazolam,
Glucostrips,MgSO4,
Hydrocortisone,
amiadarone,isosorbitrat are
not avaialable
2)back wheel of ambulance
cot is broken, search light is
given for repair
3) 2 tyres required, front
glass is broken, Horn &
siren not working, mike not
working,
4) regarding good samaritan
letter implementation
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 19/12/2018
1)IV NS not
avaialble,Inj.hydrocortiso
ne,midazolam,
Glucostrips,MgSO4,
Hydrocortisone,
amiadarone,isosorbitrat
are not avaialable
2)back wheel of
ambulance cot is broken,
search light is given for
repair
3) 2 tyres required, front
glass is broken, Horn &
siren not working, mike
not working,
4) regarding good
samaritan letter
implementation
DM MEMS yesDM MEMS
& MS Sir level
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Manjram PHC
1)pain,
Mistdress,vinodien,coolex
sprays,inj.
Dopamine,hydrocortisone,di
azepam,phenaramine
mealate,Phenaramine
mealate,amiadarone,MgSO
4, sodium
valporate,,Nalaxone HCL
tab.
Isosorbitrate,asprine,amlode
pine are not available
2)BP apparatus showing
error, glucometer given for
repair,
3)Invertor is not working
S.A.Kottakondawar
EMS coordinator, Nanded
Dt.20/11/2018
1)pain,
Mistdress,vinodien,coole
x sprays,inj.
Dopamine,hydrocortison
e,diazepam,phenaramine
mealate,Phenaramine
mealate,amiadarone,MgS
O4, sodium
valporate,,Nalaxone HCL
tab.
Isosorbitrate,asprine,aml
odepine are not available
2)BP apparatus showing
error, glucometer given
for repair,
3)Invertor is not working
DM Level yesDM MEMS
Level
Degloor SDH
1)IV
hemaxyl,Inj.Dobutamine,no
adrenaline,KCL ,aloxone
HCL,tab. isosorbitrate are
not available
2)Syring infusion pump is
kept aside
3)transfer sheet
requiredTringular bandages,
Adhesasive tapes,vomitng
bags not available
4) No sonography services
are available from last 4
months
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 20/12/2018
1)IV
hemaxyl,Inj.Dobutamine,
noadrenaline,KCL
,aloxone HCL,tab.
isosorbitrate are not
available
2)Syring infusion pump
is kept aside
3)transfer sheet
requiredTringular
bandages, Adhesasive
tapes,vomitng bags not
available
4) No sonography
services are available
from last 4 months
DM Level yes
DM MEMS
Level
Ms sir level
Hanegaon PHC
1)IV D5, Inj. dopamine,
dobutamine,
NTG,hydrocortisone,frusam
ide,midazolam,phenaatoin
sodium,Phenaramine
mealate,Dexamethasone,am
iadarone,MgSO4, Sterile
water,Sodium valporate,
Tab.
Isosorbitrate,asprine,amlode
pine are not available &
gluco strips NA
3)BP aaparatus weak
cells,search light charger
not available & AC not
working,Horn not
working,siren light off, fog
light off
S.A.Kottakondawar
EMS coordinator, Nanded
with PCR Team Dt.
20/12/2018
1)IV D5, Inj. dopamine,
dobutamine,
NTG,hydrocortisone,frus
amide,midazolam,phenaa
toin sodium,Phenaramine
mealate,Dexamethasone,
amiadarone,MgSO4,
Sterile water,Sodium
valporate, Tab.
Isosorbitrate,asprine,aml
odepine are not available
& gluco strips NA
3)BP aaparatus weak
cells,search light charger
not available & AC not
working,Horn not
working,siren light off,
fog light off
DM Level In processDM MEMS
Level
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Bhokar RH
1)pain spary, Antiseptic
solution,IV
NS,cal.gluconate,dopamine,
frusamide,dexamethasone,a
miadaron,mannitol,naloxon
e HCl, tab. Isosorbitrate,
asprinr, amlodepine are not
available
2)transport ventilator
leakage proble, Search light
charger is not available
3)tyres need to be change
S.A.Kottakondawar
EMS coordinator, Nanded
Dt.21/12/2018
1)pain spary, Antiseptic
solution,IV
NS,cal.gluconate,dopami
ne,
frusamide,dexamethason
e,amiadaron,mannitol,nal
oxone HCl, tab.
Isosorbitrate, asprinr,
amlodepine are not
available
2)transport ventilator
leakage proble, Search
light charger is not
available
3)tyres need to be change
MO level & DM Level In process
MO PHC &
DM MEMS
Level
Barhali PHC ( Dh
premices)
1)pain spray,Inj.atropine,
Dopamine,Noradrenaline,Fr
usamide, diazepam,
MgSO4,
Lignocane,amiadarone,
Nalaxone HCL, Tab.
Isosribitrate,amlodepine, are
not avaiable & glucostrips
are not available
2)nasaogatric tube,
triangular
bandages,adhessive tapes,
teeth guards, Triangular
bandages
3))patient cabin AC
damaged and not working,
S.A.Kottakondawar
EMS coordinator, Nanded
with Dt
22/12/2018
1)pain spray,Inj.atropine,
Dopamine,Noradrenaline
,Frusamide, diazepam,
MgSO4,
Lignocane,amiadarone,
Nalaxone HCL, Tab.
Isosribitrate,amlodepine,
are not avaiable &
glucostrips are not
available
2)nasaogatric tube,
triangular
bandages,adhessive
tapes, teeth guards,
Triangular bandages
3))patient cabin AC
damaged and not
working,
DM Level In processDM MEMS
Level
Loha RH
1)IV NS, DNS, D5, D5%,
Dopamine,pain spray,
inj.hydrocortisone,MgSo4,n
alaxone HCL, tab.
Isosrobitrate, Asprine,
amlodepine, are not
avaialble
2)Vomiting bagsa,teeth
guard,IV set,triangular
bandages,cervical coller is
broken, teeth guard are not
available
3)AC & Siren not working,
roof light off
S.A.Kottakondawar
EMS coordinator, Nanded
Dt. 24/12/2018
1)IV NS, DNS, D5,
D5%, Dopamine,pain
spray,
inj.hydrocortisone,MgSo
4,nalaxone HCL, tab.
Isosrobitrate, Asprine,
amlodepine, are not
avaialble
2)Vomiting bagsa,teeth
guard,IV set,triangular
bandages,cervical coller
is broken, teeth guard are
not available
3)AC & Siren not
working, roof light off
DM Level In processDM MEMS
Level
District Nanded - RBSK Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH Gokunda
( Kinwat team no.4)RBSK CO.
Mr. Kamble AB RBSK Co.
Date. 20/12/2018
1) as MCTS & Adhaar
number was not available
hence not written in
screening cards
2) their visits were not
according to given ATP
3) records of SAM/
MAM childrens are not
updated
District level Yes No
RH Mudkhed team no. 1
& 2 RBSK CO.
Mr. Kamble AB RBSK Co.
Date. 26/12/2018
1) as MCTS & Adhaar
number was not available
hence not written in
screening cards
2) their visits were not
according to given ATP
3) records of SAM/
MAM childrens are not
updated
District level Yes No
Ardhapur team no. 2 RBSK CO.Mr. Kamble AB RBSK Co.
Date. 27/12/2018
1) Team LMO is not
regular for school &
anganwadi visits
2) as MCTS & Adhaar
number was not available
hence not written in
screening cards
3) their visits were not
according to given ATP
4) records of SAM/
MAM childrens are not
updated
District level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 03/12/2018
Dr. Sudhir Nimkar,Dr.
Mangala Deshmukh &
Dr. Qmar Sultana case
attended in CJM Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 04/12/2018
Dr. Qumar sultana case
in CJM NandedDistrict Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 10/12/2018
Dr. Bole Case in Session
Court NandedDistrict Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 11/12/2018
Dr. Sudhir Nimkar case
attended in CJM Nanded
.Dr.Alurkar & Dr. U.L.
Jadhav Case in Session
Court Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 18/12/2018
Dr. Kalpana Jamdade
case attended in
Add.CJM Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 18/12/2018
Dr. Sudhir Nimkar & Dr.
Qmar Sultana case
attended in CJM Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 19/12/2018
Dr. Tanuja Barde Case in
CJM NandedDistrict Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 21/12/2018
Dr. Qmar Sultana case
attended in CJM NandedDistrict Level Yes No
District Nanded - PCPNDT Legal Counsilor
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 22/12/2018
Dr. Qmar Sultana & Dr.
Mangala Deshmukh case
attended in CJM Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 24/12/2018
Dr. Sudhir Nimkar case
attended in CJM NandedDistrict Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 26/12/2018
Attended Advisory
committee meeting At
CS Nanded. Court
hearing in matter of Dr.
Uma Dev,Dr.Pramod
Zunjare,Dr. minal
Patil,Dr. Gaytri Wadekar
attended in CJM Court
Nanded
District Level Yes No
Nanded Legal Issues
Adv. Rathod Pooja
PCPNDT Legal Counsilor
Nanded Dt. 28/12/2018
Dr. Mangala Deshmukh
case attended in CJM
Nanded
District Level Yes No
THO Mukhed Sickle cell & RKS
Miss. Sarpate Asha Sickle
Cell Co. Date :-
07/12/2018
1) RKS GB, EC Meeting
Register not Available 2)
Sickle cell Suffer
Register Not Available
3)Sickle cell Poster Not
Available
THO Level By THO Yes No
Tho Biloli Sickle cell & RKS
Miss. Sarpate Asha Sickle
Cell Co. Date :-
12/12/2018
1)RKS metting 2) Data
sheet Not Match 3) RKS
GB, EC Meeting
Register Not Available
THO Level By THO Yes No
THO Loha Sickle cell & RKS
Miss. Sarpate Asha Sickle
Cell Co. Date :-
19/12/2018
2) Data sheet Not Match
3) RKS GB, EC Meeting
Not Available
THO Level By THO Yes No
Phc Wadgao Sickle cell & RKS
Miss. Sarpate Asha Sickle
Cell Co. Date :-
26/12/2018
1) RKS GB, EC Meeting
Register not Available 2)
Sickle cell Suffer
Register Not Available
3)Sickle cell Poster Not
Available
PHC Level By MO Yes No
Tho Kandhar Sickle cell & RKS
Miss. Sarpate Asha Sickle
Cell Co. Date :-
27/12/2018
1)RKS Audit Report
Pending 2) Data sheet
Not Match 3) RKS GB,
EC Meeting Not
Available
THO Level By THO Yes No
RH Kandhar Taluka
KandharASHA Cell related Issues ASHA Co. 05/12/2018 ASHA Related Issues RH Level By MS Yes No
District Nanded - Sickle Cell Co.
District Nanded - Asha Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Shahapur Taluka
DegloorASHA Cell related Issues ASHA Co. 07/12/2018 ASHA Related Issues PHC Level By Mo Yes No
PHC Ardhapur Taluka
ArdhapurASHA Cell related Issues ASHA Co. 14/12/2018 ASHA Related Issues PHC Level By MO Yes No
SC Lone Taluka
ArdhapurASHA Cell related Issues ASHA Co. 21/12/2018 ASHA Related Issues SC Level By ANM Yes No
PHC Limbgaon RKSK related Issures
Miss. Gundale Dhanshree
RKSK Co., Nanded
Dt. 04/12/2018
1)maitri clinic not
available to seprate room
2)maitri clinic instrument
Not Purchase 3)monthly
report Releated any
issue
PHC Level By MO Yes No
PHC Limbgaon RKSK related Issures
Miss. Gundale Dhanshree
RKSK Co., Nanded
Dt. 18/12/2018
1)maitri clinic not
available to seprate
room2) Maitri clinic
Register Not
MaintainNot Established
& Material Not Purchase
PHC Level By MO Yes No
RH Umri RKSK related Issures
Miss. Gundale Dhanshree
RKSK Co., Nanded
Dt. 28/12/2018
1) Maitri clinic Register
Not Maintain2)Maitri
clinic Health Books were
Not Available 3) Rack
not Available 4)maitri
clinic Instrument Nat
Purchase
RH Level By MS Yes No
PHC Sindhi RKSK related Issures
Miss. Gundale Dhanshree
RKSK Co., Nanded
Dt. 28/12/2018
1)Maitri Clinic Any
Material& instrument
Not Available2)main
door curtain not available
3)maitri8 clinic Register
Not purchase& Maintain
PHC Level By MO Yes No
Bhandara - DHO/CS
,Sakoli - Visit to
SDH/THO Sakoli PHC &
SC
Visit to Health Institutions
Dy. Director, Health
Services, NAGPUR ,12-
11-2018
Visit to Health
InstitutionsDist Yes
Lakhani- Visit to RH
Palandur THO Lakhani,
PHC Pipalgaon & SC
Visit to Health Institutions 12-12-2018Visit to Health
InstitutionsDist Yes
District Nanded - RKSK Co.
Circle Nagpur - DDHS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Wardha - DHO/CS
Wardha, THO Wardha,
PHC- Kharangana,
Hamdapur & Sc
Visit to Health Institutions 13/12/2018Visit to Health
InstitutionsDist Yes
Nagpur- Visit to DHO/CS
, PHC Kondamendhi, SC-
Aroli,SC Dhanoli
Kondamendhi, SC
Kondamendhi B
Visit to Health Institutions 14/12/2018Visit to Health
InstitutionsDist Yes
Gadchiroli- DHO/CS
Gadchiroli, PHC Porla &
SC
Visit to Health Institutions 18/12/2018Visit to Health
InstitutionsDist Yes
Visit to DHO/CS, PHC-
Mausi, SC Mendha
Mausi,SC Moushi, SC
Paharni
Visit to Health Institutions 19/12/2018Visit to Health
InstitutionsDist Yes
Visit to DHO/CS, PHC
Davaniwada, SC-
Dawaniwada,SC
Dhapewada, SC Navegaon
Davaniwada
Visit to Health Institutions 20/12/2018Visit to Health
InstitutionsDist Yes
Visit to RH Arjuni
Morgaon, PHC Kesori,
RH Goregaon, PHC
Kurhadi, Chopa, RH
Sadak Arjuni, PHC
Pandhari, KhodShivani.
Visit to Health Institutions
Assistant Director, Health
Services, NAGPUR
,17/12/2018
Visit to Health
InstitutionsDist. Yes
Work site inspection visit
to DH Bhandara.Visit to Health Institutions 18/12/2018
Visit to Health
InstitutionsDist. Yes
Visit to SDH Chimur,
PHC Khodsungi, RH
Gond Pipari, PHC Dhaba,
Tohogaon, THO
Pombhurna, PHC
Pombhurna.
Visit to Health Institutions 19/12/2018Visit to Health
InstitutionsDist. Yes
Visit to SDH Ramtek,
PHC Mansar,THO
Savner, PHC Patan
Sawangi, Khapa, to RH
Narkhed, THO Katol.
Visit to Health Institutions 20/12/2018Visit to Health
InstitutionsDist. Yes
Circle Nagpur - ADHS
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Bhandara - DHO/CS,
PHC-Chulhad, SC-
Bapera,SC-Chulhad,SC-
Hardoli H
Visit to Health InstitutionsCPM NAGPUR,12-11-
2018
Visit to Health
InstitutionsDist. Yes
Visit to DHO/CS, PHC-
Karwahi, SC-Bandra, SC-
Devalapar,SC-Karwahi
Visit to Health Institutions 12-12-2018Visit to Health
InstitutionsDist. Yes
Visit to DHO/CS, PHC-
Ghonadi,SC-Alewada,SC-
Ambhora Ghonadi
Visit to Health Institutions 13/12/2018Visit to Health
InstitutionsDist. Yes
Visit to DHO/CS,PHC
Anji IPHS, SC-
Kamthi,SC Mahakal, SC
Mandwa Anji
Visit to Health Institutions 14/12/2018Visit to Health
InstitutionsDist. Yes
Visit to DHO/CS-
Wardha, PHC-Girad,SC-
Dhondgaon,SC-Girad,SC-
Kora
Visit to Health Institutions 18/12/2018Visit to Health
InstitutionsDist. Yes
PHC- Mansar,SC-
Bondri,SC-Borda
Mansar,SC-Kandri
Mansar
Visit to Health Institutions 19/12/2018Visit to Health
InstitutionsDist. Yes
Visit to DHO/CS, PHC-
Wadhona,SC- Gangasagar
Heti,SC Girgaon
Wadhona
Visit to Health Institutions 20/12/2018Visit to Health
InstitutionsDist. Yes
Gadchiroli- DHO/CS
Gadchiroli, PHC -
Deolgaon,SC-Andhali
Deolgaon,SC Antargaon
Deolgaon
Visit to Health Institutions 26/12/2018Visit to Health
InstitutionsDist. Yes
PHC-Chulhad,SC-Mohadi
Khapa,SC-Paraswada
Chulhad,SC-Temani
Visit to Health Institutions 27/12/2018Visit to Health
InstitutionsDist. Yes
Nil Deepika Gorde (DPM)
Nil Nil Nil Nil
Circle Nagpur - CPM
District Nagpur - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Takalghat Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
04-12-2018
Detailed report submitted
to Hon. DHO facility level Yes facility level
PHC Borkhedi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
05-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Nagardhan Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
06-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Bhandarbodi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
06-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Mansaar Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
07-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Navegaon Khairi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
12-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Tishti Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
13-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Gondkhairi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
13-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Dhapewada Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
13-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Mohapa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
13-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Makardhokada Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
14-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Bela Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
15-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Gumthi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
18-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Chicholi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
19-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
District Nagpur - QA Co.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Badegaon Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
20-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Kelwad Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
21-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Khapa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
21-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Kondhali Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
24-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Kacharisawanga Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
24-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Mowad Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
25-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Jalalkheda Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
25-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Yenwa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
26-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Mouda Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
28-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Tarsa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
31-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
PHC Kodamendhi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC
31-12-2018
Detailed report submitted
to Hon. DHO facility level yes facility level
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Borkhedi
1. RKS EC GB Meeting
2. Kayakalp Checklist
3. Audit 4) RCH Portal 5)
JSSK
Mr. Rajendra Kakde
M & Eo
Dt. 06/12/2018
1. EC & GB Meetings
should be conducted
within the month of
which procedding should
be sent to dist . Level
2. As per Kayapalat
Cheklist score of Facility
should be mailed within
3 days
3. Records should be
updated for RKS &
Statutory audit sheduled
in JUly & august. 4)
RCH Portal Data Entry
should be Poor and
Instruction for timly data
Entry 5) RT Droup back
below 75 % & Pick 25 %
District Level
DAGA WH
1. RKS EC GB Meeting
2. Kayakalp Checklist
3. Audit 4) RCH Portal 5)
JSSK
Mr. Rajendra Kakde
M & Eo
Dt. 15/12/2018
1. EC & GB Meetings
should be conducted
within the month of
which procedding should
be sent to dist . Level
2. As per Kayapalat
Cheklist score of Facility
should be mailed within
3 days
3. Records should be
updated for RKS &
Statutory audit sheduled
in JUly & august. 4)
RCH Portal Data Entry
should be Poor and
Instruction for timly data
Entry 5) RT Droup back
below 75 % & Pick 25 %
District Level Yes Nill
SDH.Ramtek
arsh report,about model
maitree clinic,iec,outreach
activity,Review of wifs
programme
Reena Bobade ARSH CO-
ORDINATOER 07.12.18
ICTC counselor, Health
workerBlock Level No No
Sirsi PHC-Sirsi Site visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
04/12/18
yes
Visited to PHC-Sirsi Construction
Site for the Supervision of
Construction Activity, Check Brick
Work, Quality of Work ,Material
and Plumb of Brick Work Given
technical Instruction to Contractor
yes no
District Nagpur - Jr.Engineer
District Nagpur - M&E OFFICER
District Nagpur - Arsh Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Sirsi PHC-Sirsi Site visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
12/12/18
yes
Visited to PHC-Sirsi Construction
Site for the Supervision of
Construction Activity, Check Brick
Work, Quality of Work ,Material
and Plumb of Brick Work Given
technical Instruction to Contractor
yes no
RH Katol RH Katol visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
14/12/18
yes RH Katol visit yes no
Sirsi PHC-Sirsi Site visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
15/12/18
yes
Visited to PHC-Sirsi Construction
Site for the Supervision of
Construction Activity, Check Brick
Work, Quality of Work ,Material
and Plumb of Brick Work Given
technical Instruction to Contractor
yes no
Kalmeshwar RH Kalmeshwar visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
17/12/18
yes RH Kalmeshwar visit yes no
Chicholi PHC Chicholi visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
20/12/18
yes PHC Chicholi visit yes no
Sirsi PHC-Sirsi Site visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
25/12/18
yes
Visited to PHC-Sirsi Construction
Site for the Supervision of
Construction Activity, Check Brick
Work, Quality of Work ,Material
and Plumb of Brick Work Given
technical Instruction to Contractor
yes no
Mumbai Mumbai meeting attend
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
26/12/18
yes Mumbai meeting attend yes no
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Sirsi PHC-Sirsi Site visit
Moh. Khalid A. Hafiz
(Junior .Engineer) dt.
28/12/18
yes
Visited to PHC-Sirsi Construction
Site for the Supervision of
Construction Activity, Check Brick
Work, Quality of Work ,Material
and Plumb of Brick Work Given
technical Instruction to Contractor
yes no
Kanhan PHC Kanhan viist
Vijay Paunikar
(Jr.Engineer) dt.
04/12/18
yes district level Yes No
SC Dighori SC Dighori visit
Vijay Paunikar
(Jr.Engineer) dt.
07/12/18
yes district level Yes No
Parshioni RH Parshioni visit
Vijay Paunikar
(Jr.Engineer) dt.
12/12/18
yes district level Yes No
Deolapar RH Deolapar visit
Vijay Paunikar
(Jr.Engineer) dt.
15/12/18
yes district level yes No
Borkhedi PHC Borkhedi visit
Vijay Paunikar
(Jr.Engineer) dt.
18/12/18
yes district level yes No
Borkhedi PHC Borkhedi visit
Vijay Paunikar
(Jr.Engineer) dt.
20/12/18
yes district level yes No
Kanhan PHC Kanhan viist
Vijay Paunikar
(Jr.Engineer) dt.
21/12/18
yes district level yes No
Takalghat, Raipur PHC Takalghat & Raipur visit
Vijay Paunikar
(Jr.Engineer) dt.
24/12/18
yes district level yes No
Parshioni RH Parshioni visit
Vijay Paunikar
(Jr.Engineer) dt.
27/12/18
yes district level yes No
Hingna RH Hingna visit
Vijay Paunikar
(Jr.Engineer) dt.
28/12/18
yes district level yes No
Kamptee SDH Kamptee visit
Vijay Paunikar
(Jr.Engineer) dt.
29/12/18
yes district level yes No
PHC Pachgaon PHC Pachgaon site visit
Shri A.R. Bhati
(Jr.Engineer)
dt. 04/12/18
yes PHC Pachgaon site visit yes no
PHC Pachgaon PHC Pachgaon site visit
Shri A.R. Bhati
(Jr.Engineer)
dt. 13/12/18
yes PHC Pachgaon site visit yes no
District Nagpur - Jr.Engineer
District Nagpur - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Pachgaon PHC Pachgaon site visit
Shri A.R. Bhati
(Jr.Engineer)
dt. 15 /12/18
yes PHC Pachgaon site visit yes no
PHC Pachgaon PHC Pachgaon site visit
Shri A.R. Bhati
(Jr.Engineer)
dt. 24 /12/18
yes PHC Pachgaon site visit yes no
PHC Pachgaon PHC Pachgaon site visit
Shri A.R. Bhati
(Jr.Engineer)
dt. 26 /12/18
yes PHC Pachgaon site visit yes no
SC Pachakhedi 1) MR Campaign1) MR Campaign
Session VisitFacility Level Yes Nil
SC Dongargaon 1) MR Campaign1) MR Campaign
Session VisitFacility Level Yes Nil
SC Fegad 1) MR Campaign1) MR Campaign
Session VisitFacility Level Yes Nil
SC Ambadi 1) MR Campaign1) MR Campaign
Session VisitFacility Level Yes Nil
PHC Mandhal
1) Jaljanya & Kitakjanya
Ajar. 2)
Medicine Stock
3) Headquarter Stay.
4) PMMVY
5) MR Campaign
DR. S.R. Nikam THO
Kuhi 07/12/2018
1) Regular Jaljanya &
Kitakjanya Ajar
Survekshan.
2) Update All Medicine
Stock Record as per
Instruction.
3) All Employees should
stay at Headquarter.
4) Fill all balance 1st
Primi ANC form & sent
to THO Office
5) MR Campaign
Session Visit
Facility Level Yes Nil
SC Wag 1) MR CampaignDR. S.R. Nikam THO
Kuhi 07/12/2018
1) MR Campaign
Session VisitFacility Level Yes Nil
SC Hardoli 1) MR CampaignDR. S.R. Nikam THO
Kuhi 07/12/2018
1) MR Campaign
Session VisitFacility Level Yes Nil
SC Tarna 1) MR CampaignDR. S.R. Nikam THO
Kuhi 10/12/2018
1) MR Campaign
Session VisitFacility Level Yes Nil
SC Jiwanapur 1) MR CampaignDR. S.R. Nikam THO
Kuhi 10/12/2018
1) MR Campaign
Session VisitFacility Level Yes Nil
District Nagpur - THO Kuhi
DR. S.R. Nikam THO
Kuhi 03/12/2018
DR. S.R. Nikam THO
Kuhi 05/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Veltur
1) Jaljanya & Kitakjanya
Ajar. 2)
Medicine Stock
3) Headquarter Stay.
4) PMMVY
5) MR Campaign
DR. S.R. Nikam THO
Kuhi 12/12/2018
1) Regular Jaljanya &
Kitakjanya Ajar
Survekshan.
2) Update All Medicine
Stock Record as per
Instruction.
3) All Employees should
stay at Headquarter.
4) Fill all balance 1st
Primi ANC form & sent
to THO Office
5) MR Campaign
Session Visit
Facility Level Yes Nil
SC Adam 1) MR CampaignDR. S.R. Nikam THO
Kuhi 14/12/2018
1) MR Campaign
Session VisitFacility Level Yes Nil
PHC Salwa
1) Jaljanya & Kitakjanya
Ajar. 2)
Medicine Stock
3) Headquarter Stay.
4) PMMVY
5) MR Campaign
DR. S.R. Nikam THO
Kuhi 19/12/2018
1) Regular Jaljanya &
Kitakjanya Ajar
Survekshan.
2) Update All Medicine
Stock Record as per
Instruction.
3) All Employees should
stay at Headquarter.
4) Fill all balance 1st
Primi ANC form & sent
to THO Office
5) MR Campaign
Session Visit
Facility Level Yes Nil
PHC Salwa
1) Jaljanya & Kitakjanya
Ajar. 2)
Medicine Stock
3) Headquarter Stay.
4) PMMVY
5) MR Campaign
DR. S.R. Nikam THO
Kuhi 24/12/2018
1) Regular Jaljanya &
Kitakjanya Ajar
Survekshan.
2) Update All Medicine
Stock Record as per
Instruction.
3) All Employees should
stay at Headquarter.
4) Fill all balance 1st
Primi ANC form & sent
to THO Office
5) MR Campaign
Session Visit
Facility Level Yes Nil
PHC Sindi Rly, (Gunj
Convent MR Campeian)
Monetring MR Campian
,Record update ,
Clenliness, IEC Board
Display
DHO 4/12/2018
Discuss , MO , Teachers,
Student ,Parents
,Pharamists , LT ,
Clerk,HA, MPW ,ANM
,Volunter,
Facility Yes No
PHC Sindi Rly,
(Kesrimal Nager
Vidyalaya Sindi Rly. MR
Campeian)
Monetring MR Campian , DHO 5/12/2018
Discuss , MO , Teachers,
Student , Parents,HA,
MPW, ANM ,Volunter,
Facility Yes No
District Wardha- DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kangaon
Sickle cell pts follow up
,record ceeck , RKS EC GB
meeting status .Planning for
100% expendature
DHO 14/12/2018
Discuss CS ,ACS,
Pharamists , LT
,Councellour
Facility Yes No
THO Office Hinganghat,
SDH Hinganghat , NUHM
Hinganghat
NUHM RKS Register
Status .RKS EC GB
meeting Record check,
Sickle cell , Electrophoresis
Testing & pts follow up
Planning for 100%
expendature
DHO 29/12/2018Discuss THO ,MS,
,Pharamists , LT , Clerk,Facility Yes No
SDH Hinganghat
1. Cleanliness is not
obsrved.
2. Not maintainance of
cashbook.
3. No Token system
Civil Surgeon, Wardha
04.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
SDH Arvi
1. Cleanliness is not
maintained.
2. EDD and EPD chart not
observed.
3. IEC material are not
sufficient.
Civil Surgeon, Wardha
07.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Wadner
1. Cashbook is not
maintained.
2. EDD and EPD chart are
not observed.
3. Animals are observed.
Civil Surgeon, Wardha
11.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Seloo
1. Drinking water system is
not maintained. 2.
IEC material is not
observed.
3. BMW is not properly
maintained.
Civil Surgeon, Wardha
14.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Deoli
1. Instruments are not
properly arranged. 2.
IEC is not enough. 3.
Water provision work under
consruction.
Civil Surgeon, Wardha
20.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Samudrapur
1. Cleanliness is not
obsrved.
2. Not maintainance of
cashbook.
3. No Token system
RMO (OR), Wardha
06.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
District Wardha- CS
District Wardha- RMO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Seloo
1. Cleanliness is not
maintained.
2. EDD and EPD chart not
observed.
3. IEC material are not
sufficient.
RMO (OR), Wardha
11.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Bhidi
1. Cashbook is not
maintained.
2. EDD and EPD chart are
not observed.
3. Animals are observed.
RMO (OR), Wardha
15.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Karanja
1. Drinking water system is
not maintained. 2.
IEC material is not
observed.
3. BMW is not properly
maintained.
RMO (OR), Wardha
18.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
RH Pulgaon
1. Instruments are not
properly arranged. 2.
IEC is not enough. 3.
Water provision work under
consruction.
RMO (OR), Wardha
21.12.2018
Given instructions to MS
and StaffDistrict Level Yes _
PHC Sindi (Rly) MR Campaign Supervision 04.12.2018 Mo Dtt
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
SC Yelakeli MR Campaign Supervision 06.12.2018 Mo Dtt
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Mandgaon ,
PHC Nandori MR Campaign Supervision 12.12.2018 Mo Dtt
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
SC Kelzar MR Campaign Supervision 14.12.2018 Mo Dtt
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
RH Samudrapur Kayakalp /NQAS
Supervision 01.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Kharangana (M)Kayakalp /NQAS
Supervision 03.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Girad Kayakalp /NQAS
Supervision 07.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
District Wardha- MO
District Wardha- QA Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH Arvi Kayakalp /NQAS
Supervision 11.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Kharangana (M)Kayakalp /NQAS
Supervision 12.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Kharangana (M)Kayakalp /NQAS
Supervision 17.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
RH Wadner/ SDH
Hinganghat
Kayakalp /NQAS
Supervision 26.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
PHC Anji Kayakalp /NQAS
Supervision 27.12.2018 DQAC
Gaps Idendifed &
Instriction given to
Concern
Facility Yes ….
RH Samudrapur/
Hamdapur
visit to RH Samudrapur &
PHC Hamdapurr Cattel
Trap & renovation work
05/12/2018 Jr.Eng
Pramod Ladekarfor measurment taken District level IDW wing yes _
PHC Allipur visit to PHC Allipur11/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Zadasi visit to PHC Zadasi14/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Vijaygopal visit to PHC Vijaygopal17/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Nachangaon visit to Nachangaon18/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Goul visit to PHC Goul19/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
District Wardha- Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Giroli visit to PHC Giroli26/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Mandgaon visit to PHC Mandgaon28/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
PHC Sidhi R visit to PHC Sidhi R31/12/2018 Pramod
Ladekar
For colouring &
brondingDistrict level IDW wing yes _
Nagpur Visit to EE Office
for Technical Sanction
Jr.Eng 01/12/2018
Pravin Kanodefor HWC SD Praposal District level IDW wing yes _
PHC Kannamwargram
Visit to Phc
kannamwargram for MR
Work
03/12/2018 Pravin
KanodeFor mr Work District level IDW wing yes _
DH Wardha Visit to Dh Wardha06/12/2018 Pravin
Kanodefor measurment taken District level IDW wing yes _
SDH ArviVisit to SDH Arvi ODF &
LDR
11/12/2018 Pravin
Kanodefor measurment taken District level IDW wing yes _
Nagpur Visit to EE Office
for Tender work
12/12/2018 Pravin
Kanode for Tender wor District level IDW wing yes _
Nagpur Visit to EE Office
for Tender work
13/12/2018 Pravin
Kanode for Tender wor District level IDW wing yes _
PHC Kannamwargram
Visit to Phc
kannamwargram for MR
Work
14/12/2018 Pravin
KanodeFor mr Work District level IDW wing yes _
DH Wardha Visit to Dh Wardha19/12/2018 Pravin
Kanodefor measurment taken District level IDW wing yes _
SDH ArviVisit to SDH Arvi ODF &
LDR
26/12/2018 Pravin
Kanodefor measurment taken District level IDW wing yes _
Kharangna go
1 - MR Campain2)Exp
Incentive 3)ASHA
AwardPrerna Programme
ASHA,26/12/2018
Ku. Dipali Chandole
Supervision In MR
Programe.
Attted the ASHA Survey
Prerna Programme and
asha incentive review
and asha Exp asha head.
Block and Phc Level to block
facilator yes
District Wardha- Jr.Engineer
District Wardha- Asha Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Aanji
2 - MR Campain2)Exp
Incentive 3)ASHA
AwardPrerna Programme
30/12/2018
Ku. Dipali Chandole
Supervision In MR
Programe.
Attted the ASHA Survey
Prerna Programme and
asha incentive review
and asha Exp asha head.
Phc Level to block facilator yes
Karanja
3 - MR Campain2)Exp
Incentive 3)ASHA
AwardPrerna Programme
31/12/2018
Ku. Dipali Chandole
Supervision In MR
Programe.
Attted the ASHA Survey
Prerna Programme and
asha incentive review
and asha Exp asha head.
Phc Level to block facilator and yes
PHC Sindi Rly, (Gunj
Convent MR Campeian)
Sickle Cell .
A7:G10Ku.Annapurna V.
Dhobale 4/12/2018
Sickle Cell . Ku.Annapurna
V. Dhobale 4/12/2018
Discuss , MO , Teachers,
Student ,Parents
,Pharamists , LT ,
Clerk,HA, MPW ,ANM
,Volunter,
Facility Yes No
PHC Sindi Rly,
(Kesrimal Nager
Vidyalaya Sindi Rly. MR
Campeian)
Monetring MR Campian ,Ku.Annapurna V. Dhobale
5/12/2018
Discuss , MO , Teachers,
Student , Parents,HA,
MPW, ANM ,Volunter,
Facility Yes No
DH Wardha
Sickle cell pts follow up
,record ceeck , RKS EC GB
meeting status .Planning for
100% expendature
Ku.Annapurna V. Dhobale
14/12/2018
Discuss CS ,ACS,
Pharamists , LT
,Councellour
Facility Yes No
THO Office Hinganghat,
SDH Hinganghat , NUHM
Hinganghat
NUHM RKS Register
Status .RKS EC GB
meeting Record check,
Sickle cell , Electrophoresis
Testing & pts follow up
Planning for 100%
expendature
Ku.Annapurna V. Dhobale
29/12/2018
Discuss THO ,MS,
,Pharamists , LT , Clerk,Facility Yes No
SAMUDRAPUR-
WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.
03/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
District Wardha- Sickle Cell Co-ordintor
District Wardha- RBSK Co.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PULGAON-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
05/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
SMUDRAPUR-
WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
07/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
ARVI-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
10/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
SDH LEVEL Yes ---
ASHTI-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
12/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
PHC LEVEL Yes ---
PULGAON-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.
14/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
WADNER-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.
18/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved
RH LEVEL Yes ---
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
HINGANGHAT -
WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
19/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
SDH LEVEL Yes ---
KHARANGANA-
WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
21/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
SELOO-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
24/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
KARANJA-WARDHA-
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.checked grand
of RBSK.Taken review of
salary off all RBSK
Team,vehicle payments,
26/12/2018 RBSK Co
Salary and vehicle
payment should with in
period,per day cheking
students target should
achieved of anganwadi
and school
RH LEVEL Yes ---
ASHTI-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.
28/12/2018 RBSK Co
cheking students[
school,anganwadi ]
target should achieved
PHC LEVEL Yes ---
ARVI-WARDHA
Visit to RBSK Team about
school and anganwadi
check-up,review taken by
RBSK Team.
31/12/2018 RBSK Co
cheking students[
school,anganwadi ]
target should achieved
SDH LEVEL Yes ---
PHC Sindi r &
School,wahitpur
PHC and School Visit for
MR Comp.01/12/2018 THO Seloo
PHC and School Visit for
MR Comp.Block level By THO Yes
District Wardha- THO Seloo
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Surgoan &
School,jaipur,PHC
Hamdapur,
SC and School Visit for MR
Comp.03/12/2018 THO Seloo
SC and School Visit for
MR Comp.Block level By THO Yes
PHC Sindi R.,Sc Kelzar
and School
PHC and School Visit for
MR Comp.06/12/2018 THO Seloo
PHC and School Visit for
MR Comp.Block level By THO Yes
SC and School Yelakeli
,PHC Hamdapur
SC and School Visit for MR
Comp.PHC Visit07/12/2018 THO Seloo
SC and School Visit for
MR Comp.PHC VisitBlock level By THO Yes
SC Jungad and
School,Gaimukh
SC and School Visit for MR
Comp.PHC Visit10/12/2018 THO Seloo
SC and School Visit for
MR Comp.PHC VisitBlock level By THO Yes
SC Akoli and School,
Nawargoan,Seldoh PHC
Salaikala
SC and School Visit for MR
Comp.PHC Visit12/12/2018 THO Seloo
SC and School Visit for
MR Comp.PHC VisitBlock level By THO Yes
Dhanoli,KhapriSC and School Visit for MR
Comp.PHC Visit14/12/2018 THO Seloo
SC and School Visit for
MR Comp.PHC VisitBlock level By THO Yes
PHC Salaikala,GarmsurPHC and School Visit for
MR Comp.SC visit17/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
Sc Hingni,PHC SalaikalaPHC and School Visit for
MR Comp.SC visit19/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
PHC Zadshi,RehakiPHC and School Visit for
MR Comp.SC visit20/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
Sc Parsodi,PHC
Sindi.,Shirsamudra
PHC and School Visit for
MR Comp.SC visit24/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
SC Akoli,MhsalaSC and School Visit for MR
Comp.SC visit27/12/2018 THO Seloo
SC and School Visit for
MR Comp.SC visitBlock level By THO Yes
SC KotmbaPHC and School Visit for
MR Comp.SC visit28/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
SC Akoli,JaminiPHC and School Visit for
MR Comp.SC visit31/12/2018 THO Seloo
PHC and School Visit for
MR Comp.SC visitBlock level By THO Yes
PHC Dahegoan Go,
Morchapur,WaitpurPHC & SC Visit
Ashwini S Mendhe,DEO
Seloo 01/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)
District Wardha- DEO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Dahegoan Go,
Kanhapur,Gondapur,
Ramna,SC Sukli St
PHC & SC VisitAshwini S Mendhe
03/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)
SC Kopra,Chanki,Seloo SC,School,AW VisitAshwini S Mendhe
04/12/2018SC,School,AW Visit Block (Data Entry Operator)
SC Yelakeli,Jamni,Seloo DHO office WardhaAshwini S Mendhe
05/12/2018SC Yelakeli,Jamni,Seloo Block (Data Entry Operator)
Deulgaon,Hamdapur SC VisitAshwini S Mendhe
07/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)
DHO office Wardha DHO office WardhaAshwini S Mendhe
10/12/2018DHO office Wardha Block (Data Entry Operator)
PHC Zadshi,Junona PHC VisitAshwini S Mendhe
12/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)
SC Akoli SC VisitAshwini S Mendhe
13/12/2018SC Visit Block (Data Entry Operator)
SC Bori SC VisitAshwini S Mendhe
17/12/2018SC Visit Block (Data Entry Operator)
DHO office Wardha DHO office WardhaAshwini S Mendhe
19/12/2018DHO office Wardha Block (Data Entry Operator)
Sc Takli, SC VisitAshwini S Mendhe
20/12/2018SC Visit MR Supervision Block (Data Entry Operator)
SC Sukli St.,Antrgoan,
Borkhedi K,PHC Zadshi,PHC & SC Visit
Ashwini S Mendhe
21/12/2018PHC & SC Visit VHND Visit Block (Data Entry Operator)
PHC Sindi R PHC VisitAshwini S Mendhe
24/12/2018PHC Visit Block (Data Entry Operator)
SC Akoli SC VisitAshwini S Mendhe
27/12/2018SC Visit Block (Data Entry Operator)
PHC Dahegoan Go, &
Hamdapur PHC Visit
Ashwini S Mendhe
29/12/2018PHC Visit Block (Data Entry Operator)
PHC Zadshi & Salaikala PHC VisitAshwini S Mendhe
31/12/2018PHC Visit Block (Data Entry Operator)
THO Lakhani, Salebhata,
Kesalwada
DHO,Dr. Prashant Uikey,
Dt.26.12.18YES PHC & SC
District Bhandara - DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Kondha, PahelaDr. Prashant Uikey,
Dt.27.12.18YES PHC & SC
THO Lakhani,
Lakhandur, PHC
Murmadi, Dighori,
Barwha, Kudegaon
Dr. Prashant Uikey,
Dt.29.12.18YES PHC & SC
PHC Digori, Barwha,
Lakhandur
Dr. Prashant Uikey,
Dt.30.12.18YES PHC & SC
RH Sihora1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 11/12/2018
1) Department 2)
follow up PWD Facility Yes
RH MOHADI1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 12/12/2018
1) Department 2)
follow up PWD Facility Yes
SDH SAKOLI1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 15/12/2018
1) Department 2)
follow up PWD Facility Yes
RH LAKHANI1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 15/12/2018
1) Department 2)
follow up PWD Facility Yes
SDH Tumsar1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 22/12/2018
1) Department 2)
follow up PWD Facility Yes
RH PALANDUR1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 27/12/2018
1) Department 2)
follow up PWD Facility Yes
RH LAKHANDUR1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt. 27/12/2018
1) Department 2)
follow up PWD Facility Yes
SDH Tumsar1) Manpower issue
2) Construction Issue
DR. Pramod Khandate (CS
)dt..30/12/2018
1) Department 2)
follow up PWD Facility Yes
SDH SAKOLI1) Manpower Issue
2) Infrastructure issue
DR. P. JAKKAL(RMO) dt.
12-12-2018
1) Department 2)
follow up PWD Facility Yes
RH PALANDUR1) Manpower issue
2) Construction Issue
DR. P. JAKKAL(RMO) dt.
15/12/2018
1) Department 2)
follow up PWD Facility Yes
District Bhandara - CS
District Bhandara - RMO
District Bhandara - M&E OFFICER
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC JAMBPMMVY Forms not filled
all, RCH Portal not updated
M&E,Smt. Damayanti.
Kature 4/12/2018PHC, SC Yes No
PHC Kudegaon
HMIS Validation committee
meeting not taken, RCH
Portal Not updated,
PMMVY Forms not filled
all,
Smt. Damayanti. Kature
18/12/2018PHC, SC Yes No
PHC Shahapur,
Mohadura
HMIS Validation committee
meeting not taken, some
issue in SC format, RCH
Portal Not updated,
PMMVY Forms not filled
all
Smt. Damayanti. Kature
21/12/2018PHC, SC Yes No
THO TUMSAR SDH
Tumsar
HMIS Validation committee
meeting not, RCH Portal
Not updated, PMMVY
Forms not filled all
Smt. Damayanti. Kature
25/12/2018PHC, SC Yes No
PHC Pahela, SC Chowa,
Manegaon
Smt. Damayanti. Kature
19/11/2018PHC, SC Yes No
PHC DhargaonChk Column Concreting up
to Slab
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.3/09/2018Yes Contractor Yes No
PHC Kesalwada, RH
Palandur
Chk. Of Lintel Steel of Type
II Qtrs of PHC and Lintel of
RH Qtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.6/09/2018Yes Contractor Yes No
PHC Dhargaon & RH-
Palandur
Visit & Taking Mtrs of
PHC and RH Qtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.10/09/2018Yes Contractor Yes No
RH-PalandurChk. Of Lintel Concreting
of Type II Qtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.14/09/2018Yes Contractor Yes No
RH-PalandurChk. Of Concreting of Slab
of Type II Qtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.18/09/2018Yes Contractor Yes No
District Bhandara - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Dhargaon, PHC
Kesalwada
Chk. Of Concreting of Slab
F/n Part & Tak Mtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.21/09/2018Yes Contractor Yes No
PHC DhargaonTaking Mtrs & Checking
Centring of Slab
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.25/09/2018Yes Contractor Yes No
RH-PalandurChk. Of Concreting of
Lintel of Type IV Qtrs
Shri Ganesh G. Tembhurne,
Jr. Engineer Dt.29/09/2018Yes Contractor Yes No
PHC JAMB
1) cleanliness not
maintained, 2) Procedings
of GB & EC not properly
recorded 3) Expenditure of
RKS, UF Not satisfactory
4) sicklecell Solubility kit
not Available.
Sickell cell,Sangita
Gondane 4/12/2018
instructed sicklecell
paients regular medicine
.RKS Mention &
updated Account Book
on properly Updated.
Facility, Mo YES NO
PHC Kudegaon
1) cleanliness not
maintained, 2) Procedings
of GB & EC not properly
recorded 3) Expenditure of
RKS, UF Not satisfactory
4) sicklecell Solubility kit
not Available.
Sangita
Gondane18/12/2018
instructed sicklecell
paients regular medicine
.RKS Mention &
updated Account Book
on properly Updated.
Facility, , Mo YES NO
PHC Shahapur,
Mohadura
1) cleanliness not
maintained, 2) Procedings
of GB & EC not properly
recorded 3) Expenditure of
RKS, UF Not satisfactory
4) sicklecell Solubility kit
not AvailIable 5) IDCF
Progrmme able.
Sangita
Gondane21/12/2018
RKS Mention & updated
Account Book on
properly Updated.
Facility, Phamacisit, Mo YES NO
THO TUMSAR SDH
Tumsar
1) cleanliness not
maintained, 2) Procedings
of GB & EC not properly
recorded 3) Expenditure of
RKS, UF Not satisfactory
4) sicklecell Solubility kit
not AvailIable 5) IDCF
Progrmme able.
Sangita
Gondane25/12/2018
RKS Mention & updated
Account Book on
properly Updated.
Facility, Phamacisit, Mo YES NO
District Bhandara - Sickle Cell Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Phc Shahapur Sc Kharbi
& Village Kharadi
ASHA Record & HBNC
Form Not Update HBNC
Home Visite Not Regularly
by Asha,Software all Entry
Not Complited Month Of
December
C.D Barai,DCM
Date- 05/12/2018
All ASHA Record &
HBNC Form Update
Monthly HBNC Home
Visite Regularly by
Asha,Software all Entry
Complited Month Of
December Withen Two
Days
1) Phc-MO,Lhv & BF 2)Sc-Asha &
ANMYes Phc & Sc
Phc Kesalwada,Sc
Garada,Channa & Village
Dhanla
ASHA Record & HBNC
Form Not Update HBNC
Home Visite Not Regularly
by Asha,Software all Entry
Not Complited Month Of
December
C.D Barai,DCM
Date- 11/12/2018
All ASHA Record &
HBNC Form Update
Monthly HBNC Home
Visite Regularly by
Asha,Software all Entry
Complited Month Of
December Withen Two
Days
1) Phc-MO,Lhv & BF 2)Sc-Asha &
ANMYes Phc & Sc
Phc Salebhata &
Pimplgaon
VHNSC Record & HBNC
Form Not Update
C.D Barai,DCM
Date- 22/12/2018
VHNSC Record &
HBNC Form Update
Monthly
1)Phc-Mo,Lhv & Bf 2)Sc- Lhv
3) Village-Asha Yes
PHC ,Sc &
Village
Phc Gobarwahi &
Nakadongari
1) Asha Software & BF
Monthly Report Not Match
2) HBNC Traner Not Not
Present Regularly by Asha
Monthly Meeting
C.D Barai,DCM
Date- 24/12/2018
1) Asha Software & BF
Monthly Report Match
Withen Due Date Every
Month 2) HBNC Traner
Will b Present Regularly
by Asha Every Monthly
Meeting
1)Phc-Mo,Bf & Lhv Yes PHC
Phc Mohadura &
Shahapur
Asha Manualy Monthly
Report Not Match Every
Month & Asha Software &
BF Monthly Report Not
Match
C.D Barai,DCM
Date- 26/12/2018
Asha Manualy Monthly
Report Match Every
Monyh & Asha Software
& BF Monthly Report
Match Withen Due Date
Every Mont
1) Phc-MO & BF 2)Village-
Asha & Bf Yes PHC & Asha
Phc Dighori & Barawa
1) Software Entry Not
Completed Month Of
November 2) Asha
Softwere,
performance,Payment, Was
Not Update 3) VHNSC
Record & HBNC Form Not
Update
C.D Barai,DCM
Date- 27/12/2018
1) Software Entry
Completed Month Of
Month Of November
Withen 4 Days 2) Asha
Softwere,
performance,Payment,
Update as Erlyar as
Possible3) VHNSC
Record & HBNC Form
Update one Week
2)Phc-Mo,LHV & Bf No PHC
District Bhandara - DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Tho Tumsar
BF Meeting-1) Mentoring
Group Meeting Proseding
Not Done 2) All Ashas Not
Paid Incentive PFMS by
Addhar link Proces C.D Barai,DCM
Date- 29/12/2018
1) Mentoring Group
Meeting Proseding
Wright to Withen 2 days
2) All Ashas Paid
Incentive PFMS by
Addhar Link Proces in
This Month
Taluka-Tho Accountant & BCM Yes Taluka
1) SDH Tumsar
1) QA Commiety Monthly
meeting Not Taken 2) Hand
Washing, Biomedical Waste
Training etc Not Completed
3) Laqshya planning for
Repair of labour Room &
OT Not Done
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 01/12/2018
1) Organize QA
Commiety Monthly
Meeting 2) Training To
be Completed
immediately 3) Estimate
to be planned for
LAQSHYA
Facility MS, Phamacist, Peon Yes No
2) PHC Goberwahi
1) Hand Washing,
Biomedical Waste Training
etc Not Completed 2)
Action plan for Kayakalp
Not Implemented
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 16/12/2018
1) Training To be
Completed immediately
2) Action plan is to be
followed immediately
Facility MO, Phamacist, Peon Yes No
3) PHC Warthi
1) Hand Washing,
Biomedical Waste Training
etc Not Completed 2)
Action plan for Kayakalp
Not Implemented
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 16/12/2018
1) Training To be
Completed immediately
2) Action plan is to be
followed immediately
Facility MO, Phamacist, Peon Yes No
4) PHC Khamba
1) QA Commiety Monthly
meeting Not Taken 2) Hand
Washing, Biomedical Waste
Training etc Not Completed
3) Cleanliness Not
Maintained 4) Fabour
Sinduri log Book Not
Maintained
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 17/12/2018
1) Organize QA
Commiety Monthly
Meeting 2) Training To
be Completed
immediately 3)
Cleaniliness to be
maintained, 4) Prepare a
Call book for Fabour
Sinduri
Facility MO, Phamacist, Peon Yes No
5)PHC Gondumari
1) QA Commiety Monthly
meeting Not Taken 2) Hand
Washing, Biomedical Waste
Training etc Not Completed
3) Cleanliness Not
Maintained 4) Fabour
Sinduri log Book Not
Maintained
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 17/12/2018
1) Organize QA
Commiety Monthly
Meeting 2) Training To
be Completed
immediately 3)
Cleaniliness to be
maintained, 4) Prepare a
Call book for Fabour
Sinduri
Facility MO, Phamacist, Peon Yes No
6)PHC Pahela
1) QA Commiety Monthly
meeting Not Taken 2) Hand
Washing, Biomedical Waste
Training etc Not Completed
3) Cleanliness Not
Maintained 4) Fabour
Sinduri log Book Not
Maintained
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 17/12/2018
1) Organize QA
Commiety Monthly
Meeting 2) Training To
be Completed
immediately 3)
Cleaniliness to be
maintained, 4) Prepare a
Call book for Fabour
Sinduri
Facility MO, Phamacist, Peon Yes No
District Bhandara - Dist.Ayush Officer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
7) PHC Lendezari1) NQAS Assesssment Nort
Completed
Dr Bhaskar Khedikar Dist
AYUSH Officer, DQAC (
In ) 22/12/2018
1) NQAS Assesssment
DoneFacility MO, Phamacist, Peon Yes No
SAKOLI
1) AWC CHECK UP
2) pending heart sergery 3)
rbsk softwere entry 4)
OTHER SURJERY
5) SHP CHECK UP
MONTH OF JULLY
RBSK CO,11-08-2018
1) PENDING HEART
SERGERY
COMPLETED IN
REGULAR. 2)
BALANCE REFFERAL
COMPLETED . 3)
BALANCE OHER
SURJERY COMPLITED
IN REGULAR CAMP.
4) SHP STARTED IN
JULLY 2018
block level yes block
MOHADI
1) AWC CHECK UP
2) pending heart sergery 3)
rbsk softwere entry 4)
OTHER SURJERY
5) SHP CHECK UP
MONTH OF JULLY
14-08-2018
1) PENDING HEART
SERGERY
COMPLETED IN
REGULAR. 2)
BALANCE REFFERAL
COMPLETED . 3)
BALANCE OHER
SURJERY COMPLITED
IN REGULAR CAMP.
4) SHP STARTED IN
JULLY 2018
block level yes block
LAKHANI
1) AWC CHECK UP
2) pending heart sergery 3)
rbsk softwere entry 4)
OTHER SURJERY
5) SHP CHECK UP
MONTH OF JULLY
21-08-2018
1) PENDING HEART
SERGERY
COMPLETED IN
REGULAR. 2)
BALANCE REFFERAL
COMPLETED . 3)
BALANCE OHER
SURJERY COMPLITED
IN REGULAR CAMP.
4) SHP STARTED IN
JULLY 2018
block level yes block
TUMSAR
1) AWC CHECK UP
2) pending heart sergery 3)
rbsk softwere entry 4)
OTHER SURJERY
5) SHP CHECK UP
MONTH OF JULLY
27-08-2018
1) PENDING HEART
SERGERY
COMPLETED IN
REGULAR. 2)
BALANCE REFFERAL
COMPLETED . 3)
BALANCE OHER
SURJERY COMPLITED
IN REGULAR CAMP.
4) SHP STARTED IN
JULLY 2018
block level yes block
RH Pauni arsh clinic opd improvedARSH CO.
BHANDARA,15-12-2018
grow opd, I strrictly
inform that outreach
programme
Districct yes Districct
District Bhandara - RBSK Co.
District Bhandara - Arsh Co.
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH TUMSAR arsh clinic opd improved 12/120/2018
grow opd, I strrictly
inform that outreach
programme
Districct yes Districct
SDH SAKOLI arsh clinic opd improved 26-12-2018
grow opd, I strrictly
inform that outreach
programme
District yes District
Phc Khamari
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
Family planning Supare
Visan NSV, Camp
THO Bhandara, 10/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation & Family
Planning
PHC & SC Yes No
Phc Dhargaon
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
12/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation
PHC & SC Yes No
Phc Shahapur
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
20/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation
PHC & SC Yes No
Phc Mohadura
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
22-12-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation
PHC & SC Yes No
Phc Khamari
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
24-12-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation
PHC & SC Yes No
District Bhandara - THO Bhandara
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Phc Pahela
LCDC Supare visan &
Sprsh prog. , Phc & SC
Cleaning, GP Cleaning the
area of the Villege,Labour
room is not maintened
RCH Portal in Updation
26-12-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart timtable to mainted
Improvement of PHC &
SC Work,RCH Portal in
Updation
PHC & SC Yes No
Phc warthi, Jamb1 )RCH Protal Entry .
2)RCH Register Incoplete
Dr.M.P,THO Mohadi
01.12.18 Instruction Given Instruction Given YES PHC Level
PHC Kardi,1), ANC Registation
,PPIUCD Register Incoplete
Dr.M.P,THO Mohadi
12.12.18Instruction Given Instruction Given YES PHC Level
PHC Jamb, Sc-,KandriHMIS output not avalable,
vaccin Stock incomplet
Dr.M.P,THO Mohadi
17.12.18 Instruction Given Instruction Given YES PHC Level
PHC-Andhalgaon ,
1 )HMIS output not
avalable, 2PMMVY Yojana
Form
Dr.M.P,THO Mohadi
21.12.18 Instruction Given Instruction Given YES PHC Level
PHC Kardi,
EDD / EPD
Incompete,HMIS output not
avalable, vaccin Stock
incomplet
Dr.M.P,THO Mohadi
24.12.18Instruction Given Instruction Given YES PHC Level
PHC_Betala , 1) Vaccenation Coverge
,PPIUCD Register Incoplete
Dr.M.P,THO Mohadi
28.12.18 Instruction Given Instruction Given YES PHC Level
PHC Chullhad,SC -
Paraswada,Sihora
Partohraph,Water Qulity,SC
Delivery Poor Performace,
PMMVY Form Not
Updated Yr 2017-18 & 18-
19, MR Action Check
Dr. M.A. Quraishi THO
Tumsar (06.12.2018)Instrucation Given
PHC Chullhad,SC -
Paraswada,SihoraYES NO
District Bhandara - THO Tumsar
District Bhandara - THO Mohadi
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Nakadongari, SC -
Ashti,Lobhi
MR Action Check,Record
Not Updated, Stock Book
Not Updated,Delivery
performance Poor,PMMVY
Form Not Updated Yr 2017-
18 & 18-19
Dr. M.A. Quraishi THO
Tumsar (11.12.2018)Instrucation Given PHC Nakadongari, SC - Ashti,Lobhi YES NO
PHC Lendezari,SC -
Pitesur,Hardoli
MR Action Plan Check
,Delivery Per formance
Unstafactory,RCH Data
En.Poor,Lokpratinidhi
Report not Done,PMMVY
Form Not Updated Yr 2017-
18 & 18-19
Dr. M.A. Quraishi THO
Tumsar (15.12.2018)Instrucation Given PHC Lendezari,SC - Pitesur,Hardoli YES NO
PHC Dewhadi,SC -
Bhamani,Madgi
MR Action Plan
Check,Partohraph,Water
Qulity,SC Delivery Poor
Performace, PMMVY Form
Not Updated Yr 2017-18 &
18-19
Dr. M.A. Quraishi THO
Tumsar (24.12.2018)Instrucation Given PHC Dewhadi,SC - Bhamani,Madgi YES NO
PHC Gobarwahi,SC-
Mitewani,Mehegoan
MR Action Plan
Check,Record Not Updated,
Cash Book Not
Updated,JSY Form Not
Sumbited,PMMVY Form
Not Updated Yr 2017-18 &
18-19
Dr. M.A. Quraishi THO
Tumsar (26.12.2018)Instrucation Given
PHC Gobarwahi,SC-
Mitewani,MehegoanYES NO
PHC Dewahadi,SC-
Kharbi,Khapa
MR Action Plan
Check,Record Not Updated,
Cash Book Not
Updated,JSY Form Not
Sumbited,PMMVY Form
Not Updated Yr 2017-18 &
18-19
Dr. M.A. Quraishi THO
Tumsar (28.12.2018)Instrucation Given PHC Dewahadi,SC- Kharbi,Khapa YES NO
PHC Lendezari, SC -
Bagheda
MR Action Plan
Check,Record Not Updated,
Cash Book Not
Updated,JSY Form Not
Sumbited,PMMVY Form
Not Updated Yr 2017-18 &
18-19
Dr. M.A. Quraishi THO
Tumsar (31.12.2018)Instrucation Given PHC Lendezari, SC - Bagheda YES NO
Kondha PHC & SC
PPIUCD Work Very
Low,NHM Fund
Expenditure Very Low,MR
Traget not Achive,Iron
Sucros Register not
Maintain,Instruct for
PMMVY Forms.
THO Pauni,Dr.T.I.Ansari (
4 December 2018)
Instrucation given for
Impraement of Work.Block No
District Bhandara - THO Pauni
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Nishtti
Immunisation Session
Visit,Instruct for PMMVY
Forms,NCD Report not
Update.
Dr.T.I.Ansari (7 December
2018)
Instrucation given for
Impraement of Work.Block No
Wahi
Immunisation Session
Visit,Instruct for PMMVY
Forms,NCD Report not
Update.
Dr.T.I.Ansari ( 14
December 2018)
Instrucation given for
Impraement of Work.Block No
Bhuyar PHC
HMIS Validation
Committee Meeting not
Held at phc Level,NHM
Fund Expenditure Very
Low,Family Planning Work
Not Satisfied.
Dr.T.I.Ansari ( 15
December 2018)
Instrucation given for
Impraement of Work.Block No
Gose
Immunisation Session
Visit,RCH Portal Data
Entry not Update,NCD
Report not Update.
Dr.T.I.Ansari ( 18
December 2018)
Instrucation given for
Impraement of Work.Block No
Asgaon PHC
HMIS Validation
Committee Meeting not
Held at phc Level,NHM
Fund Expenditure Very
Low,Iron Sucros Register
not Compelet.
Dr.T.I.Ansari ( 19
December 2018)
Instrucation given for
Impraement of Work.Block No
Palora
Immunisation Session
Visit,RCH Portal Data
Entry not Update,NCD
Report not Update.
Dr.T.I.Ansari ( 21
December 2018)
Instrucation given for
Impraement of Work.Block No
Sawarla PHC
RKS Committee Meeting
not Held last two
Month,NHM Fund
Expenditure Very Low,Iron
Sucros Register not
Maintain Properly.
Dr.T.I.Ansari ( 26
December 2018)
Instrucation given for
Impraement of Work.Block No
Nerla SC
Pmmvy Register not
Maintain Properly ,RCh
Register not Complete,RCH
Portal Data Entry not
Complete.
Dr.T.I.Ansari ( 27
December 2018)
Instrucation given for
Impraement of Work.Block No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Khamba
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
THO Sakoli,12-01-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
PHC Yes No
PHC Sangadi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
12-04-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
PHC Yes No
PHC Ekodi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
12-06-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
PHC Yes No
SC Bodara
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
12-07-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
District Bhandara - THO Sakoli
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Gondumari
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
12-12-2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
PHC Yes No
SC Ekodi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
13/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
PHC Virshi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
14/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
PHC Yes No
SC Sasara
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
15/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Umari
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
17/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
SC Sendurwafa
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
18/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
SC Virshi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
24/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
SC Kinhi
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
28/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Satalwada
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
28/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
SC Palasgaon
PHC & SC Cleaning,RCH
Portal Updation Low
Percantgae ,GP Cleaning
the area of the
Villege,Labour room
,maintened ,HDP Camp
according to guidlines .
Cleliness not mainted,Cash
Book,Leger Book
Maintened
29/12/2018
Asked to modify the
labour room according to
Protocal & Guidline.
Prepared a cleanliness
chart time table to
mainted Improvement of
PHC & SC Work,Cash
Book & Legaer Book
SC Yes No
PHC POHARA
Medicin store
verification,lebour room
visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatimIncrease
Sputm collection &
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 daysinform Give
Information abour MR
CAMPINIAN
Block yes
sc kaneri
Increase Sc deliver
Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
sc jevnada
Increase Sc deliver
Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
District Bhandara - THO Lakhani
THO
Lakhani,Dr.S.S.Hatnagar06
/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC KESALWADA
Attend Rks meeting
Medicin store
verification,lebour room
visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatimIncrease
Sputm collection &
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 daysinform &
Attend Rks meeting Give
Information abour MR
CAMPINIAN
Block yes
SC GADEGAON
update Rch data entry
(profil entry,ec
entry),Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information &
Increase Sc deliver
Block yes
SC GARADA
update Rch data entry
(profil entry,ec
entry),Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information &
Increase Sc deliver
Block yes
PHC POHARA
Visit NSV Camp;increse
ppiucd, Medicin store
verification,lebour room
visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatim Increase
Sputm collection & Rch
data entry update
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 days Give
Information abour MR
CAMPINIAN
Block yes
SC MACHARNA
Increase Sc deliver Hbnc
visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
Dr.S.S.Hatnagar10/12/2018
Dr.S.S.Hatnagar07/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC KITADI
Increase Sc deliver Hbnc
visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
PHC SALEBHATA
Attend Rks meeting ;
increse ppiucd, Medicin
store verification,lebour
room visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatim Increase
Sputm collection & Rch
data entry update
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 days Give
Information abour MR
CAMPINIAN
Block yes
SC LAKHORI
visit maternet death
;Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child informatioN
& give informatin
PPIUCD to ANC Give
Information abour MR
CAMPINIAN
Block yes
SC SOMALWADA
visit maternet death
;Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child informatioN
& give informatin
PPIUCD to ANC
Block yes
Dr.S.S.Hatnagar10/12/2018
Dr.S.S.Hatnagar15/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC PIMPALGAON
Visit NSV Camp;increse
ppiucd, Medicin store
verification,lebour room
visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatim Increase
Sputm collection & Rch
data entry update
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 days Give
Information abour MR
CAMPINIAN
Block yes
SC MIREGAON
Increase Sc deliver
Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
SC SHIVANI
Increase Sc deliver
Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
PHC MURMADITUP
Visit NSV Camp;increse
ppiucd, Medicin store
verification,lebour room
visit ,protocalll &
emrgancy durge , give
information , lab visit &
chake mf7
Ragister,conteiner survay
Ragister ,sickle cell kit
informatim Increase
Sputm collection & Rch
data entry update
.Emtolocal survay,home
visite Anm,Mpw 100%
in 15 days Give
Information abour MR
CAMPINIAN
Block yes
Dr.S.S.Hatnagar18/12/2018
Dr.S.S.Hatnagar20/12/2018
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC KOLARI
Hbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec entry)
Block yes
AV.BHUGAON
/MENDHA
IHbnc visit, Health
Education,about school
dengu awarness,sam
mam child information
update Rch data entry
(profil entry,ec
entry)Give Information
abour MR CAMPINIAN
Block yes
PHC Dighori
1) Clening TimeTable Not
Maintaned
2) Tailet Bathroom Was
Dirty 3) MR Vaccination
Visit
Dr. Dr. N.A. Meshram
(THO Lakhandur) ,03-12-
2018
Action Taken in MO
PHCPHC Level By MO Yes No
SC Barwha
1) Movement Book Not
Proprly Maintened
2) MCTS Work is Poor
3) MR Vaccination Visit
05-12-2018Action Taken in MO
PHCSub Centrer Level By MO Yes No
PHC Sarandi, 1)Tailet Bathroom Was
Dirty 2) MR. Vaccination
Visit 10-12-2018
Protocals were make
them availablePHC Level By MO Yes No
SC Soni 1) Movement Book Not
Proprly Maintened
2) MCTS Work is Poor 11-12-2018Action Taken in MO
PHC
Sub Centrer Level By MO
Yes No
SC Bothali
1) Family Flaning Work
Poor
2) IUD Kit Not available
3) Movement Book Not
Proprly Maintened
14-12-2018Action Taken in MO
PHC
Facility level By MO
District level By DHO
SC Level By ANM
Yes No
SC Dahegaon 1) Regular ANM
Trasfered Out
2) MCTS Work Poor 18-12-2018
1) workplan generation
at facility level
2) inform to THO office
1) District Level By DHO 2)
Block Level By THO
Yes No
SC Bhagdi
1) R-15 Register Not
Properly Fill
2) Stock Register not Fill
Properly
3) Delivery Work Low
21-12-2018Action Taken in MO
PHCSub Centrer Level By MO Yes No
SC Jaitpur
1) Stock Registar not
Complet Fill
2) Dots Form not Fullfil
28-12-2018Action Taken in MO
PHCPHC Level Yes No
Dr.S.S.Hatnagar20/12/2018
District Bhandara - THO Lakhandur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Goregaon Block. PHC
Kawalewada,SC Gidhadi,
SC Kalimati, SC DawwaMR Visit 1) Vaccination
was done according to
guildlines 2) tally sheet
were entered properly 3)
rest room for beneficiarys
was available
DPM,Ms.Archana
Wankhede 01/12/2018
Discuss this with school
teacher and vaccination District Level Yes No
Goregaon Block. SC
gondekhari, borgaon,
pathari, bhutaitola,
katangi, ambetalao
MR Visit 1) Vaccination
was done according to
guildlines 2) tally sheet
were entered properly 3)
rest room for beneficiarys
was available
Ms.Archana Wankhede
04/12/2018
Discuss this with school
teacher and vaccination District Level Yes No
Moorgaon Arjuni Block.
PHC Keshori
Pre assessment of NQAS 1)
clenliness was manintend 2)
All protocols were present
as per guidelines 3) BMW
management according
guidelines
Ms.Archana Wankhede
06/12/2018
discused with ANM and
respective MO &
instructed to well prepare
for NQAS teem.
Institute Level by resspective ANM
& MO and StaffsYes No
RH Salekasa
RH Visite..RH Is very
Pathatic condition no
cleanness at all.given
Febarsindurri and HLL
Reporting formate.
Ms.Archana Wankhede
12/12/2018
Discuss with MS
regarding fulfillment of
NQAS requirement
Institute Level by resspective ANM
& MO and StaffsYes Yes
PHC Kati,Kasa
Visit to RH Rajegaon and
tell to them abot
Febarsinduri reporting and
HLL reporting. And discuss
about hospital indicator
with Their Staff
Ms.Archana Wankhede
13/12/2018
Discountineation
proposal of ANM District Level Yes No
THO Saleakasa
1) All financial document
well properly 2) taluka
saniyantran & Samnay
samiti meeting registers was
not availeble during visit
Ms.Archana Wankhede
17/12/2018
Discuss with TMO
regarding this matterDistrict Level Yes No
RH RajegaonRH Visit regarding SSS and
discuss with MS
Ms.Archana Wankhede
19/12/2018
Discuss this matter with
JE & Dept. E. & CEO
ZP,Gondia
District Level (JE)
Gondia Block PHC Kati,
Amgaon Block SC Birsi
Inquiry was conducted
regarding Shobha Bohre 1)
She was not stay at head
quarter 2) Beneficiarys was
not satified with her
behaour 3) She has
produced fake reporting
regading delivery
Ms.Archana Wankhede
20/12/2018
Discuss this matter with
JE & Dept. E. & CEO
ZP,Gondia
District Level (JE)
District Gondia - DPM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH TiroraVisit to sdh Tirora For
NQAS Checklist Prepration
Ms.Archana Wankhede
24/12/2018
discuss with MS & Clerk
regardin proper
maintanance of record
MS level Yes Yes
PHCBhanpur
1) check the HWC branding
2) PHC monthly metting
was gouing on 3) instructed
health staff regarding
fulfillment of target
Ms.Archana Wankhede
31/12/2018
discuss with vaccinator
& other staff at MR
session
District Level Yes Yes
RH Salekasa
PHC Bhanpur consruction
is going on.inspection was
done.check financial
records.
Mr Sanket Morghare DAM
12/12/2018
Discuss with MO advice
to updates all recordPHC Level yes
RH Rajegaon
VISIT at PHC Soni MO
was present at visit
time.Records not
updates.checking financial
record .record not maintain
properly
Mr Sanket Morghare DAM
13/12/2018
Discuss with MOadvice
to updates all recordPHC Level yes
RH Amgaon
check the stock ragister, and
also check cashbook. Told
abou Audit information..all
fianacial document
Mr Sanket Morghare DAM
19/12/2018
Discuss with MOadvice
to updates all recordPHC Level yes
PHC Kakodi,Tho Office
Goregaon
Visit to PHC kakodi to see
new ly constructed building
Inspection.and also Maher
Ghar inspection.
Mr Sanket Morghare DAM
20/12/2018
Discuss with MOadvice
to updates all recordPHC Level yes
DHO Office
Month dec 2018 present in
officeabout MR reporting
complience in office
Mr.Ukadas R.Bisen
(District M&E officer)
3/10/2018
MR reporting
complience in officeDHO office no No
Goregaon Block. PHC
SoniMR Visit
Dr.Meena.Watti
Dist Ayush Officer
1/12/2018
Discuss with District level Yes NO
Goregaon Block. PHC
Tilli/MohgaonMR Visit
Dr.Meena.Watti
Dist Ayush Officer
4/12/2018
Discuss with CS RMO institute level yes No
Goregaon Block. PHC
SoniMR Visit
Dr.Meena.Watti
Dist Ayush Officer
6/12/2018
Discuss with CS and
RMOinstitute level yes No
RH Salekasa
RH Visite..RH Is very
Pathatic condition no
cleanness at all.given
Febarsindurri and HLL
Reporting formate.
Dr.Meena.Watti
Dist Ayush Officer
7/12/2018
Discuss with DHO and
DRCHOinstitute level yes No
District Gondia - DAM
District Gondia - M&E OFFICER
District Gondia - Dist.Ayush Officer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Rajegaon
Visit to RH Rajegaon and
tell to them abot
Febarsinduri reporting and
HLL reporting. And discuss
about hospital indicator
with Their Staff
Dr.Meena.Watti
Dist Ayush Officer
12/12/2018
advise to prepare
dacuments for kayakalp
assesmen
institute level yes No
RH RajegaonRH Visit regarding SSS and
discuss with MS
Dr.Meena.Watti
Dist Ayush Officer
13/12/2018
Discuss with DHO and
DRCHODistrict level yes No
RH Amgaon
Visit RH Amgaon Discuss
with their MO Regarding
LSCS. And also discuss
about barsinduri reporting
and HLL reporting.
Dr.Meena.Watti
Dist Ayush Officer
19/12/2018
Discuss with CS RMO District level yes No
PHC Kakodi,Tho Office
Goregaon
Inspection New Building
and then come to THO
Office Goregaon and
attainding MR Meeting
Dr.Meena.Watti
Dist Ayush Officer
20/12/2018
Discuss with CS RMO District level yes No
SDH TiroraVisit to sdh Tirora For
NQAS Checklist Prepration
Dr.Meena.Watti
Dist Ayush Officer
24/12//2018
Discuss with CS RMO District level yes No
PHCBhanpur
Visit to PHC Bhanpur
reguarding ayush
dispensary reporting .and
kayakalp .
Dr.Meena.Watti
Dist Ayush Officer
31/12/2018
Discus with THO
goregaon and DRCHO
for issue.
District level yes No
Goregaon Block. PHC
SoniMR Visit
Dr Swarnarekha
Upadhyay IPHS
Coordinator
1/12/2018
Discuss wirh DRCHO institute level yes No Pending
Goregaon Block. PHC
Tilli/MohgaonMR Visit
Dr Swarnarekha Upadhyay
IPHS Coordinator
4/12/2018
Discuss wirh DRCHO institute level yes No Pending
Goregaon Block. PHC
SoniMR Visit
Dr Swarnarekha Upadhyay
IPHS Coordinator
6/12/2018
Discuss wirh DRCHO institute level yes No Pending
RH Salekasa
RH Visite..RH Is very
Pathatic condition no
cleanness at all.given
Febarsindurri and HLL
Reporting formate.
Dr Swarnarekha Upadhyay
IPHS Coordinator
7/12/2018
Discuss with MS and
RMOinstitute level No RH
RH Rajegaon
Visit to RH Rajegaon and
tell to them abot
Febarsinduri reporting and
HLL reporting. And discuss
about hospital indicator
with Their Staff
Dr Swarnarekha Upadhyay
IPHS Coordinator
12/12/2018
Discuss with MS institute level yes RH
RH RajegaonRH Visit regarding SSS and
discuss with MS
Dr Swarnarekha Upadhyay
IPHS Coordinator
13/12/2018
Discuss with DPM institute level No, on goning RH
District Gondia - IPHS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH Amgaon
Visit RH Amgaon Discuss
with their MO Regarding
LSCS. And also discuss
about barsinduri reporting
and HLL reporting.
Dr Swarnarekha Upadhyay
IPHS Coordinator
19/12/2018
Discuss with MS institute level No, on goning RH
PHC Kakodi,Tho Office
Goregaon
Inspection New Building
and then come to THO
Office Goregaon and
attainding MR Meeting
Dr Swarnarekha Upadhyay
IPHS Coordinator
20/12/2018
Discuss with Junior
Engineer THO goregaoninstitute level yes Dist
SDH TiroraVisit to sdh Tirora For
NQAS Checklist Prepration
Dr Swarnarekha Upadhyay
IPHS Coordinator
24/12/2018
Discuss with DPM institute level yes SDH
PHC BhanpurInspection for New
Building
Dr Swarnarekha Upadhyay
IPHS Coordinator
31/12/2018
Discuss with Junior Engineer institute level yes Dist
Goregaon Block. PHC
Soni
Visit to PHC Dhabepauni
,Gothangaon,PHC Keshori ,
reguarding sicklecell NGO
work supervision orderd by
DHO .
Swapna Khandait
RKS/SCD
Coordinator1/12/2018
Discuss with DRCHO,
and drugware incharge.MMU Level, and PHC Level No PHC level
Goregaon Block. PHC
Tilli/Mohgaon
Visit to PHC Bangaon
.Cleanliness is there.MO
dispensary was present at
VISIt time as incharge
MO.Asking about Sicklecell
NGO Volenteers jobchart.
Visit to patients and ask
about disease ans
voleenteers visit to patients.
Swapna Khandait
SCD/RKS Coordinator
04/12/2018
Discuss with MO PHC Level No PHC level
SDH Tirora Visit to SDH Tiroda
Swapna Khandait
SCD/RKS Coordinator
24/12/2018
Sickle cell NGOAttend meeting about
rporting and sckle cell target
Swapna Khandait
SCD/RKS Coordinator
29/12/2019
Discuss with NGO
President and whole staffNGO level NO No
Visit TO PHC Thana
Reguarding ASHA Pro.Visit to PHC ASHA record
& payment verify
ASHA Coordinator,Sanjay
Donode 04/12/2018
Discuss with MO
Discuss with mo
regarding asha payment
Institute level No No
Visit TOTHO Tiroda
Reguarding ASHA Pro.Visit to THO ASHA record
& payment verifySanjay Donode 5/12/2018
Discuss with THO,
BCMDiscuss with mo
regarding ashaC
Institute level No No
Visit TO PHC Tilli Moh
Reguarding ASHA Pro.Visit to PHC ASHA record
& payment verifySanjay Donode 14/12/2018
Discuss with MO
Discuss with mo
regarding asha payment
Institute level No No
District Gondia - RKS & Co-ordinator
District Gondia -
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Visit TOPHC Morwahi
Reguarding MR Pro. Visit to THO MR record
verifySanjay Donode 18/12/2018
Discuss with MO
regarding MR Pro. Institute level No No
Visit TO PHC Kurhadi
Reguarding ASHA Pro. Visit to PHC ASHA record
& payment verifySanjay Donode 24/11/2018
Discuss with MO & BF
regarding asha payment ..Institute level No No
RH SalekasaVisit For Kayakalp Peer
Assissessment with Team
Jyoti SawarkarDQAC
Programme Assistant
3/12/18
SDH,RH Level
No
PHC level
RH RajegaonVisit For NQAS Central
Assessment with Team
Jyoti SawarkarDQAC
Programme Assistant
13/12/18
PHC Level
No
PHC level
SDH TiroraVisit For NQAS Central
Assessment with Team
Jyoti SawarkarDQAC
Programme Assistant
24/12/18
PHC Level
No
PHC level
Adv. Rekha Kantode
Sapate
In Slp case. No 36/2015
Rakesh Singh Vs Dr. Sanjay
Jaiswal
Adv. Rekha Kantode
Sapate, Legal Counsellor,
KTS Gondia ,04-12-2018
No Need District Level,No Need No
Adv. Rekha Kantode
Sapate
In Cr. Case No 448/2013
State Vs Minabai Sorele14-12-2018 No Need District Level ,No Need No
Adv. Rekha Kantode
Sapate
Executive Meeting At Zilla
Parishad15-12-2018 No Need District Level ,No Need No
Adv. Rekha Kantode
Sapate
Counsellor Training at
Training Institute Zilla
Parisha
16/12/2018,17/12/2018 No Need District Level ,No Need No
Adv. Rekha Kantode
Sapate
State of Maharashta Vs Dr
Omprakash Chitarkha 22-12-2018 No Need District Level ,No Need No
Adv. Rekha Kantode
Sapate
State of Maharashta Vs Dr
Rajesh Likhar27-12-2018 No Need District Level ,No Need No
District Gondia - QA Co.
District Gondia - Lagarl Counsetp
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Adv. Rekha Kantode
Sapate Review Meeting at pune 29-12-2018 No Need District Level ,No Need No
Adv. Rekha Kantode
Sapate Sonography Inspection 12/12/2018, 15/12/2018 No Need District Level,No Need No
PHC Gothangaon, SC
Gothangaon, SC Mungali,
SC Nawegaonbandh
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
Taluka Health Office
Arjuni Mor.,12/12/2018 &
10.30 AM
Shri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
PHC Mahagaon,SC
Itkheda,SC Mahurkuda,
SC Morgaon
Measle Rubela Lasikaran ,
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
13/12/2018 & 11.00 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
PHC Korambhitola, SC
Arjuni 1 & 2 , SC
Kormbhi, SC
Korambhitola
Measle Rubela Lasikaran ,
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
15/12/2018 & 10.30 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
PHC Channabakti, SC
Tadgaon, SC Dongargaon,
SC Bondgaon,SC Silezari
Measle Rubela Lasikaran ,
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
17/12/2018 & 11.30 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
District Gondia - Arjuni Mor.,
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Dhabepawani, SC
Zasinagar, SC Pawani &
SC Kanholi
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
18/12/2018 & 10.30 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
PHC Channabakti, SC
Pimpalgaon, SC Mungali
,SC Bhivkhidaki
Measle Rubela Lasikaran ,
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
20/12/2018 & 10.30 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
GondiaRCH Portal & HMIS
Software Training26/12/2018 & 08.30 AM
Shri D.B.Bokade,
Programme Assistant
PHC Keshori, SC Keshori,
SC Chicholi, SC ParastolaMeasle Rubela Campain 27/12/2018 & 10.30 AM
Shri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
PHC Channabakti, SC
Bondgaondevi
PMMVY Form, IMR &
MMR Verification, RCH
Portal Entry, Child
Registration, ANC
Registration , JSY
Beneficiery Adhar Number
& Account Number and
Other Records Verify
28/12/2018 & 09.30 AMShri D.B.Bokade,
Programme AssistantYes
Block and By
THOYes
NRHM Office ,GondiaStatutory Audit
Compaliance01/12/2018 & 09.10 AM
Shri S.S.Tiwari Block
AccountantYes
PHC Dhabepauni, PHC
Gothangaon
Cash Book, Update jsy
beneficiery in RCH Portal,
Maher Ghar , Manav Vikas
Programme and Other
Records Verify
03/12/2018 & 10.15 AMShri S.S.Tiwari Block
AccountantYes
Block and By
THOYes
NRHM Office ,Gondia Councurrent Audit
Compaliance05/12/2018 & 09.40
Shri S.S.Tiwari Block
AccountantYes
NRHM Office Gondia Office Work & SBI Challan 10/12/2018 & 09.30 AMShri S.S.Tiwari Block
AccountantYes
District Gondia - Block Auuountant
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
THO Office Sadak Arjuni PFMS Problem 12/12/2018 & 01.30 PMShri S.S.Tiwari Block
AccountantYes
Collector office, Gondia Commissioner Meeting 1312/2018 &09.30AMShri S.S.Tiwari Block
AccountantYes
CEO Office ,GondiaExecutive Committee
Meeting15/12/2018 & 08.30AM
Shri S.S.Tiwari Block
AccountantYes
DHO office, Gondia Arogya Samiti Meeting 17/12/2018 & 10.30 PMShri S.S.Tiwari Block
AccountantYes
Sc Navegaon, SC Mungli,
SC Kholi
Cash Book, Update jsy
beneficiery in RCH Portal,
Maher Ghar , Manav Vikas
Programme and Other
Records Verify
19/12/2018 & 01.10 PMShri S.S.Tiwari Block
AccountantYes
Block and By
THOYes
NRHM Office Gondia BPMU & PHC Staff Salary 20/12/2018 & 09.15 AMShri S.S.Tiwari Block
AccountantYes
RH Navegaonbandh
Cash Book, Update jsy
beneficiery in RCH Other
Records Verify
21/12/2018 & 10.30 AMShri S.S.Tiwari Block
AccountantYes
Block and By
THOYes
NRHM Office Gondia PFMS Staff Salary Quiery 24/12/2018 & 9.25 AMShri S.S.Tiwari Block
AccountantYes
PHC Gothangaon, SC
Dhabetekadi
Cash Book, Update jsy
beneficiery in RCH Portal,
Maher Ghar , Manav Vikas
Programme and Other
Records Verify
26/12/2018 & 09.30 AMShri S.S.Tiwari Block
AccountantYes
Block and By
THOYes
PHC Keshori, PHC
Channabakti
Cash Book, Update jsy
beneficiery in RCH Portal,
Maher Ghar , Manav Vikas
Programme and Other
Records Verify
27/12/2018 & 10.30 AMShri S.S.Tiwari Block
AccountantYes
Block and By
THOYes
NRHM Office, Gondia PIP Re-apropration 29/12/2018 & 10.30 AMShri S.S.Tiwari Block
AccountantYes
PHC Gothangaon Village-
Kawatha, Dongargaon,
Navegaon/ Bandh BAD
School
MR Campaign Vaccination
Site Supervission Viist 01/12/2018 & 11.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
District Gondia - DCM
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC-Channa/Bakti
Pimpalgaon, Siregaon
Bandh, Phc-Dhabeapauni
Village- Navegaon/ Bandh
& Ranjitola
MR Campaign Vaccination
Site Supervission Viist 02/12/2018 & 10.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
KTS GondiaPMMVY Programme Video
Conference06/12/2018 & 08.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
Yes
PHC Keshori Village
Ilada & Knhalgaon
PMMVY form information
of ASHA, VHNSC , Asha
HBNC Form Check &
LBW Child Visit
10/12/2018 & 11.00 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
Z.P.GondiaFamily Planing (FPLM)
Training12/12/2018 & 08.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
Yes
PHC Mahagaon Village
Itkheda & Phc-
Korambhitola Village
Asoli & Gaurnagar
MR Vaccination Campaign
Supervission & Asha visit
& PMMVY Benefisharies
Form Check
13/12/2018 & 10.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
PHC channa/Bakti,Village
Nimgaon & Aratatondi
MR Campaign Vaccination
Site Viist & PMMVY Form
Curies Clean up.
18/12/2018 & 10.00 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
PHC Keshori Village
Chicholi
SC Visit For VHNSC &
Asha Record Check up &
Anganwadi Visit For
VHNSC Acc.No.
19/12/2018 & 11.00 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
PHC Mahagaon Village
Butai & Siroli
Asha Record Check, HBNC
Form Check & LBW Child
Visit Immunization Session
Visit
21/12/2018 & 10.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
PHC channa/Bakti
Asha monthly Meeting &
PFMS Payment For Asha
Nov 2018
24/12/2018 & 10.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
PHC Korambhitola Sc-
Dhabetekadi
Healtha Camp Visit &Asha
PMMVY Work Check26/12/2018 & 11.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
YesBlock and By
THOYes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Z.P.GondiaASHA Yojana Review
Meeting28/12/2018 & 08.30 AM
Shri Z.B.Gaykwad Block
Community Mobilizer
(Asha)
Yes
RH SALEKASA
inj.Lignocain,inhaler
Beclomethasone,Pressure
infusion bag,Extension IV
lines are not available.
EMS
COORDINATOR,3.12.201
8
Discussed with
108MO,DM,CS sir District Level yes No
RH NAWEGAON
BANDH
inj.Noradrenaline,inj.Nitrog
lycerine,Inhalor
Beclomethasone,Inhalor
Salbutamol,inj.Lignocaine,i
nj.Amiadarone,inj.Paraceta
mol,Tab.Aspirine are not
available.Stock register is
incomplete.
4.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH ARJUNI MOR
inj.Dopamine,inj.Hydrocarti
sone,Inhalor
Solbutamol,Inhalor
Beclomethasone,Tab.Aspiri
ne,inj.Nalaxone HCL ,Mini
Tracheostomy
kit,Rightangle sheivel
connector,inj.Morphine.inj.
Fentanyl are not
available.Stock register is
incomplete.
5.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH GOREGAON
inj.Calcium
carbonate,inj.Etofylline,inj.
Pheniramine
maleate,inj,Lignocain,inj.K
CL,Inhaler
Beclomethasone,inj.Amiada
rone,inj.Paracetamol
,syp.Paracetamol are not
available.search light is not
in working condition.
7.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
District Gondia - EMS Co-ordinator
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH CHICHGAD
Mistdress spray,vinodine
spray,inj.Noradrenaline,inj.
atropine,inj.Hydrocortisone,
inj.Paracetamol,inj.KCL,inj.
Nitroglycerine are not
available.Inhaler
Beclomethasone,Inhaler
Salbutamol,inj.Sodium
valporate,syp.Paracetamol
are not available. Search
light is not in working
condition.
10.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH RAJEGAON
Micopore,Mini
Tracheostomy
kit,Rightangled Shivel
Connector,inj,KCL are not
available.Stock register is
incomplete.
13.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH SALEKASA
inj.Lignocain,inhaler
Beclomethasone,Pressure
infusion bag,Extension IV
lines are not available.
14.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH GOREGAON
inj.Calcium
carbonate,inj.Etofylline,inj.
Pheniramine
maleate,inj,Lignocain,inj.K
CL,Inhaler
Beclomethasone,inj.Amiada
rone,inj.Paracetamol
,syp.Paracetamol are not
available.search light is not
in working condition.
17.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH SADAK ARJUNI
Antiseptic solution,Teeth
guard is not
available.Cervical coller is
broken.
17.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH DEORI
inj.Adrenaline,inj.Calcium
carbonate,inj.Lignocain,inj.
Mannitol,Inj.KCL,inj.Sodiu
m
valporate,Inj.Dopamine,inj.
dobutamine,Paracetamol,inj
.Frusemide,Activated
charcoal,syp.Paracetamol,in
j.Paracetamol,inj.Amiadaro
ne are not available.Search
light is not in working
condition.
18.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
RH AMGAON
Providine iodine
solution,Pain
spray,inj.Noradrenaline,inj.
Nitroglycerine,inj.Diazepam
,inj.Magnesium
sulphate,Inj.KCL,Syp.Parac
etamol,inj.Calcium
carbonate,inj.Dopamine,inj.
Dobutamine,inj.Nalaxone
HCL are not available.
18.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH NAWEGAON
BANDH
inj.Noradrenaline,inj.Nitrog
lycerine,Inhalor
Beclomethasone,Inhalor
Salbutamol,inj.Lignocaine,i
nj.Amiadarone,inj.Paraceta
mol,Tab.Aspirine are not
available.Stock register is
incomplete.
19.12.2018Discussed with
108MO,DM,ZM,CS Sir District Level yes No
RH ARJUNI MOR
inj.Dopamine,inj.Hydrocarti
sone,Inhalor
Solbutamol,Inhalor
Beclomethasone,Tab.Aspiri
ne,inj.Nalaxone HCL ,Mini
Tracheostomy
kit,Rightangle sheivel
connector,inj.Morphine.inj.
Fentanyl are not
available.Stock register is
incomplete.
19.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
PHC EKODI
inj.Calcium
carbonate,inj.Dopamine,inj.
KCL,inj.Lignocain,inj.Parac
etamol,inj.Frusemide,Tab.Is
osorbide dinitrate,Mini
Tracheostomy kit,Nasal
airway and
catheters,Pressure infusion
bags,Rightangled shivel
connector are not available.
22.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
KTSH GONDIA
Cervical coller is
broken.syp.Paracetamol,Inh
alor
Beclomethasone,inj.Morphi
ne,inj.Fentanyl are not
available.
26.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
BGWH GONDIA
EMT shears is not
available.Search light is not
in working
condition..inj.Dopamine,inj.
Dobutamine,inj.Noradrenali
ne are not available.
26.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH CHICHGAD
Mistdress spray,vinodine
spray,inj.Noradrenaline,inj.
atropine,inj.Hydrocortisone,
inj.Paracetamol,inj.KCL,inj.
Nitroglycerine are not
available.Inhaler
Beclomethasone,Inhaler
Salbutamol,inj.Sodium
valporate,syp.Paracetamol
are not available. Search
light is not in working
condition.
27.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
PHC DAWWA
Pain
spray,inj.Dopamine,inj.Dob
utamine,inj.Noradrenaline,i
nj.Nitroglycerine,inj.KCL,T
ab.Isosorbide
Dinitrateare,syp.Paracetamo
l,inj.Paracetamol are not
available.Search light is not
available.stock book is
incomplete.
28.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
SDH TIRODA
inj.Dopamine,inj.Mannitol,i
nj.Diazepam,Inhalor
Beclomethasone are not
avaialble.stock book is
incomplete.
29.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
RH SOUNDAD
Providine iodine
solution,inj.Etofylline,inj.K
CL,inj.Lignocain,Extension
IV lines,Micropore,Mini
Tracheostomy kit are not
available.
31.12.2018Discussed with
108MO,DM,CS Sir District Level yes No
GhuggusMRVC planning in
Vidhya Vihar School
Dr.Prakash Sathe,
DHO, Dt.01/12/2018MRVC plannig Block level
Ghuggus
MRVC planning in
Mount Carmel
Academy
Dr.Prakash Sathe,
DHO, Dt.03/12/2018MRVC plannig Block level
District Chandrapur - DHO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Warora, Kosarsar
TMO/PHC visit, review
of National programs,
planning of Rubella
program, FP camp
review meeting
Dr.Prakash Sathe,
DHO, Dt.04/12/2018
Visit, review and
meetingBlock level
Nagpur EPS office meetingDr.Prakash Sathe,
DHO, Dt.05/12/2018Attend meeting --
Ghuggus
Innogration of MRVC
program in Mount
Carmel Academy
Dr.Prakash Sathe,
DHO, Dt.06/12/2018MRVC Campaign Block levele
Ghuggus, Majri, Kosarsar MRVC verificationDr.Sandip Gedam, DRCHO,
01/12/2018MRVC Block level
Ghuggus Innogration function and
St.Marry School inspection
Dr.Sandip Gedam, DRCHO,
03/12/2018
Attending innogration and
inspectionBlock level
Bhadrawati, Warora,
KosarsarMRVC verification
Dr.Sandip Gedam, DRCHO,
07/12/2018MRVC Block level
Rajura, Dewada, Kadholi MRVC verificationDr.Sandip Gedam, DRCHO,
13/12/2018MRVC Block level
Ghuggus PHC visitDr.Sandip Gedam, DRCHO,
17/12/2018Visit & review Block level
SFWB Pune NID WorkshopDr.Sandip Gedam, DRCHO,
19/12/2018Attend WS --
Wadhona, Talodhi, Balapur MRVC verificationDr.Sandip Gedam, DRCHO,
26/12/2018MRVC Block level
SFWB Pune PIP reappropriation meetingDr.Sandip Gedam, DRCHO,
29/12/2018Attend meeting --
Nagpur EPF meetingShri.Shriniwas Mulawar,
DPM, 05/12/2018Attend meeting --
DDHS Nagpur Division meetingShri.Shriniwas Mulawar,
DPM, 18/12/2018Attend meeting --
Nagpur Nagpur ZP office for Dy
Engg. Additional Charge
Nilesh Khade
Dy. Engineer
01.12.2018
Nagpur office work
Nagpur Nagpur ZP office for Dy
Engg. Additional Charge
Nilesh Khade
Dy. Engineer
03.12.2018
Nagpur office work
District Chandrapur - DRCHO
District Chandrapur - DPM
District Chandrapur - Dy.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Phc Sirsi, Nagpur For Site Inspection.
Nilesh Khade
Dy. Engineer
06.12.2018
site visit for Inspection of
Sirsi PHC
PHC-saori For Site Inspection.
Nilesh Khade
Dy. Engineer
07.12.2018
Inspection of Finishing
work
Nagpur Nagpur ZP office for Dy
Engg. Additional Charge
Nilesh Khade
Dy. Engineer
10.12.2018
site visit to MCH wing
Daga
PHC Gangalwadi Inspection of site work
Nilesh Khade
Dy. Engineer
11.12.2018
Inspection of phc main
building brick work &
Type II qtr plinth level
work
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
12.12.2018
EE office work
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
13.12.2019
EE office work
PHC-Tadali, Saori SC-
Chinchala, For Site Inspection.
Nilesh Khade
Dy. Engineer
17.12.2018
Inspection of Finishing
work
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
18.12.2018
EE office work Site visit
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
20.12.2018
EE office work Site visit
Mumbai state office
Nilesh Khade
Dy. Engineer
24.12.2018
submission of tender file
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
27.12.2018
EE office work Site visit
Nagpur Nagpur ZP office for EE
Additional Charge
Nilesh Khade
Dy. Engineer
31.12.2018
EE office work Site visit
PHC Gangalwadi Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
01.12.2018
Inspection of phc main
building brick work &
Type II qtr plinth level
work
PHC Tadali & SC chinchala Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
03.12.2018
Inspection of Finishing
work
Bembal phc Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
04.12.2018
Inspection of Site work
District Chandrapur - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Saori Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
05.12.2018
Inspection of Finishing
work
Nagpur EE office Nagpur
Dhiraj D. kasarlewar
Junior Engineer
07.12.2018
Laqshya Estimate checking
PHC Gangalwadi Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
10.12.2018
Inspection of phc main
building brick work &
Type II qtr plinth level
work
Ngbhid BTT Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
12.12.2018
Inspection of Site work
PHC Saori Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
15.12.2018
Inspection of Finishing
work
Bembal phc Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
18.12.2018
Inspection of Site work
Nagpur EE office Nagpur
Dhiraj D. kasarlewar
Junior Engineer
21.12.2018
Laqshya Estimate checking
& Taking TS
PHC Gangalwadi Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
24.12.2018
Inspection of phc main
building brick work &
Type II qtr plinth level
work
Mumbai Meeting state office Mumbai
Dhiraj D. kasarlewar
Junior Engineer
26.12.2018
Monthly Review Meeting
PHC Saori Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
27.12.2018
Inspection of Finishing
work
PHC Gangalwadi Inspection of site work
Dhiraj D. kasarlewar
Junior Engineer
30.12.2018
Inspection of phc main
building plaster work &
Type II qtr Lintel level
work
HFWTC,PUNE
1)NCD CBAK Form
Ragistration In NCD
SOFTWARE 2) Patients
Identification & Provide
Health Service 3)
NcdSoftware Related In
ANM,Mo
Ku. Sheetal V. Rajapure,
Dcm (ASHA Yojna).
7/12/2018 To 8/12/2018
Training On NCD
PROGRAMME
SOFTWARE
District Yes No
SDH Mul Nil
Ku. Shweta Ainchwar (DPS
RBSK)
01/12/2018
Nil Nil YES Block Level
District Chandrapur - RBSK Co.
District Chandrapur - Jr.Engineer
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SDH Mul Nil
Ku. Shweta Ainchwar (DPS
RBSK)
05/12/2018
Nil Nil YES Block Level
SDH Mul Nil
Ku. Shweta Ainchwar (DPS
RBSK)
06/12/2018
Nil Nil YES Block Level
SDH Mul Nil
Ku. Shweta Ainchwar (DPS
RBSK)
10/12/2018
Nil Nil YES Block Level
visit to warora for
sonography center
inspection
Inspected sonography center
with medical suprintendant
Chandrapur PCPNDT Legal
Advisor,04-12-2018NIL NIL NIL NIL
visit to shindewahi for
sonography center
inspection
Inspected sonography center
with medical suprintendant 19-12-2018 NIL NIL NIL NIL
visit to ballarpur and
gadchandur for
sonography center
inspection
Inspected sonography center
with medical suprintendant 20-12-2018 NIL NIL NIL NIL
visit to Pune for review meeting 29-12-2018 NIL NIL NIL NIL
RH Rajura MR Campaign Reporting
Chandrapur ARSH
Coordinator,Yogita
Ambekar 04-12-218
- CS Level Yes 4
RH RajuraARSH Clinic Visit.MR
Campaign Reporting
Yoogita Ambekar 05-12-
2018- CS Level Yes
RH RajuraARSH Clinic Visit.MR
Campaign Reporting
Yoogita Ambekar 06-12-
2018- CS Level Yes
SDH Warora Outreach ProgrammYoogita Ambekar 08-12-
2019- CS Level Yes
SC -Manora
1) PMMVY data entry not
done
2)Rch data entry not done
3) SC Parisar no clean
Updated
Ballarpur THO,Dr. Prakash
M. Nagrale 3/12/2018 yes SC NO at ANM level
PHC-Visapur
1) RCH data entry not done
2) PMMVY data entry not
done
3)injection vids was not
dispojed
Dr. Prakash M. Nagrale
3/12/2018 yes PHC NOat MO phc
level
District Chandrapur - PCPNDT Legal Advisor
District Chandrapur - ARSH Coordinator
District Chandrapur - THO Ballarpur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC kothari
1) RCH data entry not done
2)PHC ward was not clean
3) Anm was absent
Dr. Prakash M. Nagrale
3/12/2018 yes PHC NOat MO phc
level
SC -Bamni
1 RCH data entry not done
2}SC over all work ok
3) PMMVY data entry not
done
Dr. Prakash M. Nagrale
3/12/2018 yes SC NO at ANM level
Sivni SC/Grampanchant
2 RCH data entry not done
2}SC over all work ok
3) PMMVY data entry not
done
Dr. Prakash M. Nagrale
3/12/2018 yes Grampanchant Yes at bdo level
SC- Palasgaon
1 pmmvy data entry not
done
2}SC over all work ok
3)PMMVY data entry not
done
Dr. Prakash M. Nagrale
3/12/2018 yes SC NO at ANM level
SC- Nandgaon
1 RCH data entry done
updation done
2}SC over all work ok
2) stock book not Updated
Dr. Prakash M. Nagrale
3/12/2018 yes SC NO at ANM level
Daheli-Grampanchant
1)Clorination Rejistar not
updeted
2}bleeching pouder is no
3) ot valu purification
investication
Dr. Prakash M. Nagrale
3/12/2018 yes Grampanchant Yes at bdo level
kothari-Grampanchant
1)Clorination Rejistar not
updeted
2}bleeching pouder is no
3) ot valu purification
investication
Dr. Prakash M. Nagrale
3/12/2018 yes Grampanchant Yes at bdo level
PHC kothari
1)Cash book not updated
2) stock book not Updated
3) soe & uc not Submit
Shri Prakash vitthal gaurkar
ACCOUNTANT
3/12/2018
- PHC NO -
PHC kothari
1) soe & uc not submit
2)audit compalaince no
submit
3) stock book not Updated
Shri Prakash vitthal gaurkar
ACCOUNTANT
06/12/2018
- PHC NO -
PHC kalmana
1) Cash book not updated
2)audit compalaince no
submit
3) soe & uc not Submit
Shri Prakash vitthal gaurkar
ACCOUNTANT
12/12/2018
- PHC NO -
District Chandrapur - Accountant Ballarpur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC kalmana
1) Cash book not updated
2) stock book not Updated
3) soe & uc not Submit
Shri Prakash vitthal gaurkar
ACCOUNTANT
19/12/2018
- PHC NO -
sc manora
1)Cash book not updated
2) stock book not Updated
3) soe & uc not Submit to
phc
Shri Prakash vitthal gaurkar
ACCOUNTANT
21/12/2018
- sc NO -
PHC-Visapur
1) RCH data entry not done
2) HMIS-report
3) PMMVY data entry not
done
Kanta Narayan Bhagat data
Oferator 01/12/2018 - phc NO -
PHC- kothari
1) RCH data entry not done
2) HMIS- report
3)PMMVY data entry not
done
Kanta Narayan Bhagat data
Oferator 13/12/2018 - PHC NO -
SC Manora
1) RCH data entry not done
2) DHIS-2 report
3) PMMVY data entry not
done
Kanta Narayan Bhagat data
Oferator 15/12/2018 - SC NO -
SC Palasgaon
1) RCH data entry not done
2) DHIS-2 report
3) PMMVY data entry not
done
Kanta Narayan Bhagat data
Oferator 18/12/2018 SC NO -
PHC-Visapur
1) RCH data entry not done
2) HMIS- report
3)3) PMMVY data entry
not done
Kanta Narayan Bhagat data
Oferator 19/12/2018 - phc NO -
PHC-Kalmana
1) RCH data entry not done
2) HMIS-2 report
3)3) PMMVY data entry
not done
Kanta Narayan Bhagat data
Oferator 29/12/2018 - PHC NO -
PHC-Kalmana
1) RCH data entry not done
2) HMIS- report
3) PMMVY data entry not
done
Kanta Narayan Bhagat data
Oferator 31/12/2018 - PHC NO -
Navi Daheli
1) Asha Record
2) Asha HBNC Visit
3) Asha Visit
Ballarpur BCM,Madhuri
Eknath Bhure 07/12/2018- SC NO
Kawdajai
1) Asha Record
2) Asha HBNC Visit
3) Asha Visit
Madhuri Eknath Bhure
11/12/2018- SC NO
Kinhi
1) Asha Record
2) Asha HBNC Visit
3) Asha Visit
Madhuri Eknath Bhure
15/12/2018- SC NO
Aamdi
1) Asha Record
2) Asha HBNC Visit
3) Asha Visit
Madhuri Eknath Bhure
20/12/2018SC NO
District Chandrapur - BCM Ballarpur
District Chandrapur - DEO Ballarpur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Visapur
1) Asha Record
2) Asha Monthly Meeting
3)Asha HBNC VISIT
Madhuri Eknath Bhure
24/12/2018PHC NO
Kothari
1) Asha Record
2) Asha Monthly Meeting
3)Asha HBNC VISIT
Madhuri Eknath Bhure
26/12/2018PHC NO
PHC Clines
PHC Premises area not
clean & Urgently take
action
Labour Room Protocal
Labour Room Protocol
follow as per Govt.
norms
Medicine Store Room
Medicine Store room
clean and maintain stock
record
PHC Clines
PHC Premises area not
clean & Urgently take
action
Labour Room Protocal
Labour Room Protocol
follow as per Govt.
norms
Medicine Store Room
Medicine Store room
clean and maintain stock
record
PHC Clines
PHC Premises area not
clean & Urgently take
action
Labour Room Protocal
Labour Room Protocol
follow as per Govt.
norms
Medicine Store Room
Medicine Store room
clean and maintain stock
record
PHC Clines
PHC Premises area not
clean & Urgently take
action
Labour Room Protocal
Labour Room Protocol
follow as per Govt.
norms
Medicine Store Room
Medicine Store room
clean and maintain stock
record
PHC Clines
PHC Premises area not
clean & Urgently take
action
Labour Room Protocal
Labour Room Protocol
follow as per Govt.
norms
Medicine Store Room
Medicine Store room
clean and maintain stock
record
PHC-Mudza, SC-WandraDr.V. V. Dudhapachare
15/12/2018
SC-Torgaon bk, SC-
Kaleta
Dr.V. V. Dudhapachare
19/12/2018Block Level YES
PHC-Mendki, SC-EkaraDr.V. V. Dudhapachare
12/12/2018Block Level YES
PHC-Chaugan,SC-
Maldongari
Dr.V. V. Dudhapachare
13/12/2018Block Level YES
District Chandrapur - THO Bramhapuri
PHC-ArherNavargaon,
SC-Sondri
THO Bramhapuri,Dr.V. V.
Dudhapachare
06/12/2018
Block Level YES
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Audit Information
All documents will be
prepread for Concrant
Audit
Cash Book UpdationCashbook will be
completed before audit
Manav Vikas MissionCash book not completed
& given by cheque
Lock Book Updation Lock book not completed
sc cash book
U/F AMG fund exp. But
cash book not update
2016-17 & 2017-18.
fund collect but not
Audit Information
All documents will be
prepread for Concrant
Audit
Cash Book UpdationCashbook will be
completed before audit
Manav Vikas MissionCash book not completed
& given by cheque
Lock Book Updation Lock book not completed
sc cash book
U/F AMG fund exp. But
cash book not update
2016-17 & 2017-18.
fund collect but not
Audit Information
All documents will be
prepread for Concrant
Audit
Cash Book UpdationCashbook will be
completed before audit
Manav Vikas MissionCash book not completed
& given by cheque
Lock Book Updation Lock book not completed
sc cash book
U/F AMG fund exp. But
cash book not update
2016-17 & 2017-18.
fund collect but not
MCTS Workplan
Generation
MCTS Mother & Child
Workplan Not generate
in propar Date
DHIS-2 Data Correction Instruct to DHIS-2 Data
Correction
PHC-Chaugan,SC-
Maldongari
Shri. S.M. Khobragade
12/12/2018Block Level NO
SC-Torgaon bk, SC-
Kaleta
Shri. S.C. Shahare
17/12/2018
District Chandrapur - DEO Bramhapuri
PHC-Mudza, SC-WandraShri. S.C. Shahare
14/12/2018
PHC Level Yes
PHC Level Yes
District Chandrapur - Accountant Bramhapuri
PHC-Chaugan,SC-
Maldongari
Shri. S.C. Shahare
12/12/2018Block Level Yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Delivary Point Delivary rate is low as
per norms
MCTS Data UpdationInstruct to Mothly
MCTS Data Updation
DHIS-2 Data Correction Instruct to DHIS-2 Data
Correction
Cleanness Aware to Premises
cleanness
MCTS Workplan
Generation
MCTS Mother & Child
Workplan Not generate
in propar Date
DHIS-2 Data Correction Instruct to DHIS-2 Data
Correction
Delivary Point Delivary rate is low as
per norms
B. F. not signed on Asha's
record register
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
bad concelling by asha to
people
Instruct Asha that doing
a better concelling to
people
Found expired medicine
Instruct Asha that
destryed the medicene
whenever medicine
expired
HBNC form not filled
properlly
Asha not maintained record
regulery
bad concelling by asha to
people
HBNC form not filled
properlly
PHC-Mendki, SC-
Ranbothali
Shri. S.D. Mahadole
12/12/2018
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
PHC Level yes
PHC-ArherNavargaon,
SC-Pimpalgaon
Shri. S.D. Mahadole ,BCM
Bramhapuri
5/12/2018
SC. Level yes
PHC-Chaugan, SC-
Maldongari
Shri. S.D. Mahadole
6/12/2018
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
PHC & SC Level yes
PHC-Gangalwadi, SC- RuiShri. S.M. Khobragade
19/12/2018PHC Level NO
District Chandrapur - BCM Bramhapuri
PHC-Chaugan,SC-
Maldongari
Shri. S.M. Khobragade
12/12/2018Block Level NO
SC-Torgaon bk, SC-KaletaShri. S.M. Khobragade
17/11/2018PHC Level NO
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Asha not maintained record
regulery
bad concelling by asha to
people
TB patient followed
regularlly but patient not
caring himself
TB follow up card was not
updated
On ASHA Record Register
was not sign
HBNC form not filled
properlly
Asha not maintained record
regulery
bad concelling by asha to
people
PHC Chichpalli, PHC
Durgapur
1) Check RCH Register
2) PHC Building Inspection
3) EDD & EPD Line List
not Displayed
Chandrapur THO ,DR
Madhuri Meshram
THO
01/12/2018
EDD EPD list display
within 3 days
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Borda, SC Nagala cash book not update
DR Madhuri Meshram
THO
04/12/2018
cashbook update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Kolsa Record seen & verify
DR Madhuri Meshram
THO
07/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
District Chandrapur - THO Chandrapur
PHC Mudza, SC-HaldaShri. S.D. Mahadole
18/12/2018
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
PHC Level yes
PHC-Gangalwadi, SC-
Baradkinhi
Shri. S.D. Mahadole
13/12/2018
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
PHC Level yes
PHC-Mendki, SC-
Ranbothali
Shri. S.D. Mahadole
12/12/2018
Instruct to B.F. that she
was meet to Asha each
& every time, checked
the Asha's record register
& sighn it.
PHC Level yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Durgapur, SC
BhataliRecord seen & verify
DR Madhuri Meshram
THO
11/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
SC Durgapur 3, SC
BhataliRecord seen & verify
DR Madhuri Meshram
THO
12/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Ghuggus, SC
Ghuggus 1, 2, 3, 4
Cash Book & Vehicle log
book not update
DR Madhuri Meshram
THO
13/12/2018
cashbook & vehicle log
book update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Pandharkawada, SC
Sakharwahi
1) SC Untied voucher not
update 2)
cash book not update
DR Madhuri Meshram
THO
14/12/2018
record update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Marda, SC Nakoda,
PHC GhuggusRecord seen & verify
DR Madhuri Meshram
THO
15/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Tadali, SC
Yashwantnagar
1) Check RCH Register
2) Cashbook not Update
DR Madhuri Meshram
THO
18/12/2018
Cashbook update within
2 days
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Morwa, SC Dewada
1) JSY Record verify
2) RCH ANC Registration
not complete
DR Madhuri Meshram
THO
19/12/2018
JSY Updated & RCH
Data entry completed
within 3 days
ACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Chichpalli, SC
Nagala
1-Log Book Not Update
2-Financial Records not
sufficient
3-Delivery Room Not clean
DR Madhuri Meshram
THO
20/12/2018
log book updated,
suggest delivery room
clean
ACTION TAKEN AT PHC LEVEL
BY MOYES
SC Kolsa, SC Junona Record seen & verify
DR Madhuri Meshram
THO
21/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Ghuggus, PHC
TadaliRecord seen & verify
DR Madhuri Meshram
THO
26/12/2018
record updatedACTION TAKEN AT PHC LEVEL
BY MOYES
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Pipari, SC Marda1) Cashbook not update
2) JSY Record veriry
DR Madhuri Meshram
THO
27/12/2018
cashbook update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Chichpalli, PHC
Durgapur, SC Bhatali
1) Cashbook not update
2) JSY Record veriry
DR Madhuri Meshram
THO
28/12/2018
cashbook update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Durgapur, SC
Bhatali, SC Padmapur
1) Cashbook not update
2) JSY Record veriry
DR Madhuri Meshram
THO
29/12/2018
cashbook update within 3
days
ACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Ghuggus, SC
Ghuggus 1, 2, 3, 4
1) JSY Record verify & jsy
check not issue to
beneficieries
Ku. Jayanjali Meshram
Acct.
11/12/2018
JSY Record Updated &
jsy check issued to
beneficieries within 3
days
PHC & SC Level YES
PHC Durgapur, SC
Padmapur
1) RKS Balancesheet not
update
2) notesheet & voucher not
prepared
3) Record not update
Ku. Jayanjali Meshram
Acct.
12/12/2018
Balance sheet updated &
fixed assit register update
update within 5 days
PHC & SC level YES
PHC Tadali, SC
YashwantnagarRecord seen & verify
Ku. Jayanjali Meshram
Acct.
13/12/2018
record updated SC level YES
SC Pandharkawada, SC
Pipari
1) JSY Record verify & jsy
check not issue to
beneficieries
Ku. Jayanjali Meshram
Acct.
15/12/2018
JSY Record Updated &
jsy check issued to
beneficieries within 3
days
PHC & SC level YES
SC Nagala, SC Borda Record seen & verify
Ku. Jayanjali Meshram
Acct.
18/12/2018
record updated PHC & SC Level YES
PHC Durgapur, PHC
Chichpalli
1) RKS Balancesheet not
update
2) notesheet & voucher not
prepared
3) Record not update
Ku. Jayanjali Meshram
Acct.
19/12/2018
Balance sheet updated &
fixed assit register update
update within 5 days
SC level YES
SC Kolsa, SC Junona
1) JSY Record verify & jsy
check not issue to
beneficieries
Ku. Jayanjali Meshram
Acct.
21/12/2018
Record updated & jsy
check issued to
beneficieries within 7
days
SC level YES
District Chandrapur - Accountant Chandrapur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Ghuggus, SC
NakodaRecord seen & verify
Ku. Jayanjali Meshram
Acct.
24/12/2018
record updated PHC & SC level YES
SC Marda, SC PipariRecord seen & verify,
Cashbook not update
Ku. Jayanjali Meshram
Acct.
27/12/2018
Cashbook updated within
3 daysSC level YES
PHC Ghuggus, SC
Ghuggus 1, 2, 3, 4
RCH Data Entry not
complete
Sandeep M. Moon
DEO
01/12/2018
RCH Entry complete
within 5 daysPHC & SC Level YES
PHC Durgapur, SC
Bhatali
1) RCH ANC Registration
not complete
2)JSY Register & RCH
register chek
Sandeep M. Moon
DEO
11/12/2018
RCH Registration
complete within 8 daysPHC & SC Level YES
PHC Tadali, SC
Yashwantnagar
1) RCH ANC Registration
not Update
Sandeep M. Moon
DEO
12/12/2018
RCH ANC update within
8 daysPHC & SC Level YES
PHC Chichpalli, SC
Junona
RCH Child Updation not
complete
Sandeep M. Moon
DEO
14/12/2018
RCH Child updation
within 6 daysPHC & SC Level YES
SC Sakharwahi, SC
Yashwantnagar
1 . RCH ANC & Infant
Registration not complete &
not Update
Sandeep M. Moon
DEO
18/12/2018
ANC & Infant
Registration complete &
Update within 7 days
SC level YES
PHC Chichpalli, PHC
Durgapur
1 . RCH ANC Registration
not complete & not Update
Sandeep M. Moon
DEO
20/12/2018
ANC Registration
complete & Update
within 7 days
PHC & SC Level YES
SC Borda, SC Nagala1) RCH Data entry not
complete
Sandeep M. Moon
DEO
21/12/2018
RCH ANC Registration
complete wihin 6 daysPHC & SC Level YES
PHC Ghuggus, PHC
Tadali
1) RCH Bank & Adhar &
ANC not complete
Sandeep M. Moon
DEO
26/12/2018
RCH Data entry
complete within 6 daysSC level YES
District Chandrapur - DEO Chandrapur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Pandharkawada, SC
Sakharwahi
RCH ANC & Child Entry
not update
Sandeep M. Moon
DEO
27/12/2018
RCH ANC & Child entry
update within 6 daysPHC Level YES
PHC Bhisi
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 01/12/2018
informed to do Sanitation
& RKS EC GB Meeing
Planing
Facility Yes
SC Bamni
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 03/12/2018MR Supervision Facility Yes
PHC Neri
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 04/12/2018
informed to do Sanitation
& RKS EC GB Meeing
Planing
Facility Yes
Gadgaon
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 05/12/2018MR Supervision Facility Yes
PHC Jambhulghat
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 06/12/2018
informed to do Sanitation
& RKS EC GB Meeing
Planing
Facility Yes
PHC Shankarpur
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 13/12/2018
informed to do Sanitation
& RKS EC GB Meeing
Planing
Facility Yes
PHC Jambhulgat
1) Sanitation was Not done
2) not Plan RKS EC & GB
Meeting
Dr. D. S. Meshram
Date 26/12/2018
informed to do Sanitation
& RKS EC GB Meeing
Planing
Facility Yes
1) Referral Registers is not
updated
2) RKS GB & EC Meetings
not Arrange
Shri. T. G. Wankhede
Date 11/12/2018
informed to updated
record & Referral
Registers updeted & pay
to jsy benefit
Facility Yes
PHC Neri
1) RKS GB & EC Meetings
not Arrange
2) Free Diet Registers is not
updated
3) RKS GB & EC Meetings
not Arrange
Shri. T. G. Wankhede
Date 13/12/2018
Referral Registers
updeted & Conduct RKS
EC Meetings
Facility Yes
PHC Shankarpur
1) RKS GB & EC Meetings
not Arrange
2) Free Diet Registers is not
updated
3) RKS GB & EC Meetings
not Arrange
Shri. T. G. Wankhede
Date 15/12/2018
Referral Registers
updeted & Conduct RKS
EC Meetings
Facility Yes
District Chandrapur - THO Chimur
District Chandrapur - Accountant Chimur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Khadsangi
1) Referral Registers is not
updated
2) RKS GB & EC Meetings
not Arrange
Shri. T. G. Wankhede
Date 21/12/2018
Referral Registers
updeted & Conduct RKS
GB & EC Meetings
Facility Yes
PHC Neri
1) Record was not Updeted
2) Referral Registers is not
updated
3) NRHM Grant not
distribut to SC & VHNS
Shri. T. G. Wankhede
Date 27/12/2018
Referral Registers
updeted & Conduct RKS
GB & EC Meetings
Facility Yes
PHC Bhisi
1) Record was not Updeted
2) Referral Registers is not
updated
3) NRHM Grant not
distribut to SC & VHNS
Shri. T. G. Wankhede
Date 29/12/2018
Referral Registers
updeted & Conduct RKS
GB & EC Meetings
Facility Yes
PHC Masal
1) MCTS Was Not done
2) Child Death Audit was
not complited.
Shri. K. T. Gedekar
Date 12/12/2018
informed to complete
RCH Mother & Child
Data entry
Facility Yes
PHC Jambhulghat
1) MCTS Was Not done
2) Village wise register
were not filled.
Shri. K. T. Gedekar
Date 15/12/2018
informed to complete
RCH Mother & Child
Data entry and told to
update Adhar & Bank
Detaile
Facility Yes
PHC Khadsangi
1) MCTS Was Not done
2) Child Death Audit was
not complited.
Shri. K. T. Gedekar
Date 18/12/2018
informed to complete
RCH Mother & Child
Data entry and told to
update Adhar & Bank
Detaile
Facility Yes
PHC Neri
1) MCTS Was Not done
2) Village wise register
were not filled.
Shri. K. T. Gedekar
Date 20/12/2018
informed to complete
RCH Mother & Child
Data entry and told to
update Adhar & Bank
Detaile
Facility Yes
PHC Shankarpur
1) MCTS Was Not done
2) Child Death Audit was
not complited.
Shri. K. T. Gedekar
Date 24/12/2018
informed to complete
RCH Mother & Child
Data entry and told to
update Adhar & Bank
Detaile
Facility Yes
PHC Shankarpur
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 05/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Neri
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 11/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Masal
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 17/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Jambhulghat
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 19/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
District Chandrapur - BCM Chimur
District Chandrapur - DEO Chimur
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Khadsangi
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 26/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Neri
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 27/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Bhisi
1) HBNC From Not
Updated
2) LBW Child Not reffred
to PHC Leval
Ku. D. S. Rohankar
Date 29/12/2018
informed to HBNC From
Updated ASHA &
Informed to Reffred Low
birth baby to PHC
Facility Yes
PHC Tohogaon
1) Financial Recard Update
2)log book not update
3)Cleanliness not
satisfactoryDr. Nagrade 01/12/.2018
Instruction given to
Medical OfficerBlock Facility yes
PHC DHABA
1) Stock Book not update
2)Budit Majuri not clear
recard
3)cash book Update Dr. Nagrade 07/12/.2018
Instruction given to
Medical OfficerBlock Facility yes
SC NANDVARDHAN
1) )Sub center Billding Not
working
2)Cleanliness not
satisfactory
3) poor Contener suervey
Dr. Nagrade 11/12/2018Instruction given to
ANM& MPWBlock Facility yes
B. Talohdi
1) water pump not working
2)Cleanliness not
satisfactory
3)Not Payment of Budit
Majuri
Dr. Nagrade 13/12/2018Instruction given to
ANMBlock Facility yes
SC LATHI
1) water pump not working
2)Cleanliness not
satisfactory
3)Not Payment of Budit
Majuri
Dr. Nagrade 15/12/2018Instruction given to
ANM& MPWBlock Facility yes
SC Kharalpeth/wadoli
1) Sc Building is all poor
condition
2)recard book not update
3)Cleanliness not
satisfactory
Dr. Nagrade 18/12/2018Instruction given to
ANMBlock Facility yes
SCLathi
1) Sc Building is all poor
condition
2)recard book not update
3)Cleanliness not
satisfactory
Dr. Nagrade 20/12/2018Instruction given to
ANMBlock Facility yes
District Chandrapur - THO Gondpipri
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC DHABA
1) Cash book not update
2)MCtS Date Entry not
Update
3) Stock book not avilable
Dr. Nagrade 26/12/2018Instruction given to
ANMBlock Facility yes
SC WEDGAON
1) Stock Book not update
2)Budit Majuri not clear
recard
3) MANV Vikas camp is
report in not porvaid
Dr. Nagrade 31/12/2018Instruction given to
ANMBlock Facility yes
DHABA PHC
1) Stock Book not update
2) finacial Recard update
3) Vehical lag book not
done
Bajrang G. Gedam
01/12/2018
Instruction given to
Medical OfficerBlock leval yes -
TOHOGAON PHC
1) Log book not upda
2)Cash book not apdet
Given
3) Fix Assed Rajister Not
apdet
Bajrang G. Gedam
05/12/2018
Instruction given to
Medical OfficerBlock leval yes -
TOHOGAON PHC
1) Jsy Payment not done
2) finacial Recard Not
update
3) JSY Payment Bank
Diteles Givan
Bajrang G. Gedam
11/12/2018
Instruction given to
ANMBlock leval yes
DHABA PHC
1) Log book not update
2) finacial Recard update
3) Stock Book not update
Bajrang G. Gedam
15/12/2018
Instruction given to MO
& Ju. ClerkBlock leval yes
DHABA PHC
1) Log book not update
2) finacial Recard update
3) Stock Book not update
Bajrang G. Gedam
18/12/2018
Instruction given to MO
& Ju. ClerkBlock leval yes
TOHOGAON PHC
1) Log book not update
2) finacial Recard update
3) Stock Book not update
Bajrang G. Gedam
21/12/2018
Instruction given to MO
& Ju. ClerkBlock leval yes -
Lathi
1) Jsy benifisari bank ditesl
not given
2) finacial Recard update
3) Stock Book not update
Bajrang G.
Gedam26/12/2018
Instruction given to
ANMBlock leval yes
District Chandrapur - Accountant Gondpipri
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
TOHOGAON PHC
1) Stock Book not update
2) finacial Recard update
3) JSY Payment Bank
Diteles Givan
Bajrang G. Gedam
28/12/2018
Instruction given to MO
& Ju. ClerkBlock leval yes
sc Nandwardhan
1) Stock Book not update
2) finacial Recard update
3) JSY Payment Bank
Diteles Givan
Bajrang G. Gedam
31/12/2018
Instruction given to
ANMBlock leval yes
phc-Dhaba
1) 1)very few Institutional
Delivery 2)
very few Maher Ghar
Institutional Delivery
3Jsy Ragister Recard Not
Update
Bhawana N. Sangade
01/12/2018
Instruction given to
ANM Block Facility No
phc-Tohogaon
1)very few Institutional
Delivery 2)
very few Maher Ghar
Institutional Delivery
3Iron sucroz Ragister
Recard Not Update
Bhawana N. Sangade
02/12/2018
Instruction given to
ANMBlock Facility No
sc-Lathi
1)very few Institutional
Delivery
2) EPP-EDD calender not
propary Display
3)RCH Ragister not update
Bhawana N. Sangade
11/12/2018
Instruction given to
ANMBlock Facility No
phc-Tohogaon
1) EPP-EDD calender not
propary Display
2) very few Institutional
Delivery
3)Recard Not Update
Bhawana N. Sangade
14/12/2018
Instruction given to
ANMBlock Facility No
phc-Tohogaon
1)very few Institutional
Delivery
2)JSY Not paid Benificiris
3)Cleanliness not
satisfactory
Bhawana N. Sangade
18/12/2018
Instruction given to
ANMBlock Facility No
phc dhaba
1) very few RCh entry
2) Maher ghar rigishrtar
Not Complite 3)Recard
Not Update
Bhawana N. Sangade
20/12/2018
Instruction given to
ANMBlock Facility No
District Chandrapur - DEO Gondpipri
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
sc-Nandwardhan
1)R15-R 16 ragister Recard
Child Not Update
2)Cleanliness not
satisfactory
3)Jsy Ragister verificetion
Bhawana N. Sangade
24/12/2018
Instruction given to
ANMBlock Facility yes
phc-Tohogaon
1) EPP-EDD calender not
propary Display
2) very few Maher Ghar
Institutional Delivery
3Iron sucroz Ragister
Recard Not Update
Bhawana N. Sangade
29/12/2018
Instruction given to
ANMBlock Facility No
PHC Jiwati
1- RCH DATA ENTRY NOT
COMPLETED
2-DELIVERY ROOM NOT
CLEAN 3-RECORDS
NOT PROPERLY FILLED
THO Dr. Bansod 05-
12-2018YES PHC YES
kumbezari
1- RCH DATA ENTRY NOT
COMPLETED
3-RECORDS NOT PROPER
14-12-18 YES SC YES
Shedwahi
1-MHIS/DHIS WORKBOOK
NOT FILL PROPERLY
2- WATER SUPPLY NOT
SUFFICIENT 3-
ELECTRICITY NOT
SUFFICIENT
14-12-18 YES SC YES
Lambori
1- REGISTER WERE NOT
COMPLETE 2- DELIVERY
ROOM IS NOT CLEAN 3-
ASHA REGISTER NOT
COMPLETE
14-12-18 YES SC YES
Wani
1- HMIS /DHIS BOOKLET
NOT FILLED PROPERLY
2- MCTS DATA ENTRY
NOT COMPLETED
20-12-18 YES SC YES
kekezari
1-REGISTER NOT
COMPLETED
2-BROKEN COMPOUND
WALL 3-DHIS
BOOKLET NOT
COMPLETED
20-12-18 YES SC YES
District Chandrapur -THO Jiwati
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Patan
1- RCH DATA ENTRY NOT
COMPLETED
2-DELIVERY ROOM NOT
CLEAN 3-RECORDS
NOT PROPERLY FILLED
05-12-18 YES SC YES
Shengaon
1-WATER SUPPLY NOT
SUFFICIENT 2-
FINANCIAL RECORDS NOT
SUFFICIENT
3-DELIVERY ROOM NOT
CLEAN
27-12-18 YES SC YES
Nandappa
1-SISTER NOT PRESENT
2-REGISTER NOT
COMPLETED 3-
RECORDS NOT
COMPLETED
27-12-18 YES SC YES
Paramdoli
1) Verify RCH Data Entry
2) Verify HMIS/DHIS Data
Entry
3) Avalability Eqvipment &
Instrument
DEO- Vijay Dakre 11-
12-2018YES PHC NO
Nokewada
1) Verify RCH Data Entry
2) Verify HMIS/DHIS Data
Entry
3) Avalability Eqvipment &
Instrument
11-12-18 YES SC NO
kekezari
1-SOME RECORDS NOT
AVAILABLE
2-REGISTER NOT
COMPLETED 3-
VHNSC REGISTER NOT
COMPLETE
18-12-18 YES SC YES
kumbezari
1-REGISTER NOT
COMPLETED
2-BROKEN COMPOUND
WALL 3-ASHA
FINANCIAL RECORDS NOT
AVAILABLE
18-12-18 YES SC YES
Wani
1-WATER SUPPLY NOT
SUFFICIENT 2-
FINANCIAL RECORDS NOT
SUFFICIENT
18-12-18 YES SC YES
District Chandrapur - DEO Jiwati
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Patan
1) Verify RCH Data Entry
2) Verify HMIS/DHIS Data
Entry
3) Avalability Eqvipment &
Instrument
20-12-18 YES SC YES
Hirapur
1-SOME RECORDS NOT
AVAILABLE
2-REGISTER NOT
COMPLETED
27-12-18 YES SC YES
Shengaon
1-WATER SUPPLY NOT
SUFFICIENT 2-
PHYSICAL RECORDS NOT
SUFFICIENT
3-DELIVERY ROOM NOT
CLEAN
27-12-18 YES SC YES
Nadappa
1-SISTER NOT COME FOR
RCH 2-
INCOMPLETE MCTS
REGISTER 3-
DELIVERY ROOM NOT
CLEAN
27-12-18 YES SC YES
Paramdoli
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
BCM- Rajeshwar Bhagat
11-12-2018
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
PHC yes NO
Nokewada
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
11-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
kekezari
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
18-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
kumbezari
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
18-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
District Chandrapur - BCM Jiwati
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
Wani
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
18-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
PHC Patan
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
20-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
Hirapur
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
27-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
Shengaon
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
27-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
Nadappa
1) Verify Asha Record
Maintainance
2) AshaImmunization Session
3) BF Visit At home leval &
Asha HBNC Visit
27-12-18
1)Inform Asha to update
thair record & MCTS no
(2) BF to take visit at
bebeficerise level 3) Give
update about HBNC to
Asha
SC yes NO
PHC Naranda
1- RCH DATA ENTRY NOT
COMPLETED
2-DELIVERY ROOM NOT
CLEAN 3-RECORDS
NOT PROPERLY FILLED
THO Dr. Bansod 03-
12-2018YES
ACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Mandwa
1- RCH DATA ENTRY NOT
COMPLETED
2-DELIVERY ROOM NOT
CLEAN 3-RECORDS
NOT PROPER
03-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Bakhardi
1-DHIS/HMIS WORKBOOK
NOT FILL PROPERLY
2- WATER SUPPLY NOT
SUFFICIENT 3-
ELECTRICITY NOT
SUFFICIENT
11-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
District Chandrapur - THO Korpana
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Kodshi
1- REGISTER WERE NOT
COMPLETE 2- DELIVERY
ROOM IS NOT CLEAN 3-
ASHA REGISTER NOT
COMPLETE
21-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Lakhmapur
1- DHIS/HMIS BOOKLET
NOT FILLED PROPERLY
2- RCH DATA ENTRY NOT
COMPLETED
11-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Wansadi
1-REGISTER NOT
COMPLETED
2-BROKEN COMPOUND
WALL 3-DHIS
BOOKLET NOT
COMPLETED
15-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Korpana
1-REGISTER NOT
COMPLETED
2-BROKEN COMPOUND
WALL 3-DHIS
BOOKLET NOT COMPLETE
15-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Matha
1-WATER SUPPLY NOT
SUFFICIENT 2-
FINANCIAL RECORDS NOT
SUFFICIENT
3-DELIVERY ROOM NOT
CLEAN
28-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
SC Piparda
1-SISTER NOT PRESENT
2-REGISTER NOT
COMPLETED 3-
RECORDS NOT
COMPLETED
28-12-2018 YESACTION TAKEN AT PHC LEVEL
BY MOYES
PHC Naranda
1-FINANCIAL RECORDS
NOT SUFFICIENT
2-VHNSC REGISTER
NOT COMPLETE 3-
WATER SUPPLY NOT
SUFFICIENT
ACC-Abdul Bari 05-
12-2018YES ACTION TAKEN AT PHC LEVEL BY MO YES
PHC Virur gadegaon
1-WATER SUPPLY NOT
SUFFICIENT 2-
IMMUNISATION
SESSION NOT DONE
PROPERLY
05-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
District Chandrapur - Accountant Korpana
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Korpana
1-FINANCIAL RECORDS
NOT SUFFICIENT
2-VHNSC REGISTER
NOT COMPLETE 3-
WATER SUPPLY NOT
SUFFICIENT
13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Wansadi
1-ASHA FINANCIAL
RECORDS NOT
AVAILABLE
13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Pipari
1-SOME RECORDS NOT
AVAILABLE
2-REGISTER NOT
COMPLETED 3-
VHNSC REGISTER NOT
COMPLETE
13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Bhoygaon
1-REGISTER NOT
COMPLETED
2-BROKEN COMPOUND
WALL 3-ASHA
FINANCIAL RECORDS
NOT AVAILABLE
19-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Antargaon
1-WATER SUPPLY NOT
SUFFICIENT 2-
FINANCIAL RECORDS
NOT SUFFICIENT
19-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Yergavhan
1-SISTER NOT PRESENT
2-REGISTER NOT
COMPLETED 3-
RECORDS NOT
COMPLETED
24-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
SC Piparda
1-SOME RECORDS NOT
AVAILABLE
2-REGISTER NOT
COMPLETED
24-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES
PHC Naranda1-DELIVERY BENEFITS
NOT GIVEN TO ASHA
BCM-Sandip Kamble
05-12-2018YES
ACTION TAKEN AT PHC LEVEL BY
MOYES
PHC Virur gadegaon1-DELIVERY BENEFITS
NOT GIVEN TO ASHA05-12-2018 YES
ACTION TAKEN AT PHC LEVEL BY
MOYES
SC Korpana
1-ASHA FINACIA
REGISTER NOT DONE
PROPERLY
13-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
District Chandrapur - BCM Korpana
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Wansadi
1-ASHA REGISTER NOT
COMPLETE 2-
DELIVERY BENEFITS NOT
GIVEN TO ASHA
13-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
SC Pipari
1-RECORDS NOT
COMPLETE 2-CO
ORDINATION WITH ASHA
NOT GOOD
13-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
SC Bhoygaon1-SISTER NOT PRESENT
2-SC WAS LOCKED19-12-2018 YES
ACTION TAKEN AT PHC LEVEL BY
MOYES
SC Antargaon
1-ASHA REGISTER NOT
COMPLETE 2-
DELIVERY BENEFITS NOT
GIVEN TO ASHA
19-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
SC Yergavhan
1-SISTER NOT PRESENT
2-REGISTER NOT
COMPLETED
24-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
SC Piparda
1-INCOMPLETE ASHA
REGISTER
2-ASHA IMMUNISATION
SESSION NOT AVALAIBE
24-12-2018 YESACTION TAKEN AT PHC LEVEL BY
MOYES
PHC Rajoli & SC
Kosambi
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 04 /12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
PHC & SC Level Yes
PHC Chiroli & SC
Junasurla
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 06 /12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
PHC & SC Level Yes
PHC Maroda & SC
Chimda
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 11 /12/2018
1. Instruct to Mothly
RCHData Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
SC Level Yes
PHC Chiroli & PHC
Bembal
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 12 /12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
SC Level Yes
District Chandrapur -THO Mul
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Chichala & SC
Nandgaon
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 14 /12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
SC Level Yes
PHC Bembal & SC
Yergaon
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 26/12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
PHC Level Yes
PHC Chiroli & SC Kelzar
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Dr. S. K. Meshram
Dt. 28/12/2018
1. Instruct to Mothly
RCH Data Updation
2. Instruct to Physical
Record Updated
3. Instruction to MR
Compain
PHC Level Yes
PHC Bembal & SC
Rajgad
1. Financial Record Updated
2. Physical Record Updated Shri. D.D. Tekulwar
Dt. 10 /12/2018
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
PHC Level YES
PHC Rajoli & SC
Dongargaon
1. Financial Record Updated
2. Physical Record UpdatedShri. D.D. Tekulwar
Dt. 14/12/2018
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
PHC Level YES
PHC Chiroli & SC Janala
1. Financial Record Updated
2. Physical Record UpdatedShri. D.D. Tekulwar
Dt. 17/12/2018
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
PHC Level YES
SC Nandgaon & SC
Junasurla
1. Financial Record Updated
2. Physical Record UpdatedShri. D.D. Tekulwar
Dt. 19/12/2018
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
PHC Level YES
SC Chichala & SC
Bhejgaon
1. Financial Record Updated
2. Physical Record UpdatedShri. D.D. Tekulwar
Dt. 21/12/2016
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
3. Instruction to MR
Compain
PHC Level YES
PHC Maroda & SC
Chimda
1. Physical Record Updated
3. Cleanness
Shri. D.D. Tekulwar
Dt. 28/12/2018
1. All Records will be
prepread
2. Instruct to Mothly RCH
Data Updation
3. Instruction to MR
Compain
PHC Level YES
District Chandrapur - Accountant Mul
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Bembal & SC
Rajgad
1. RCH Workplan Generation
2.RCH Due date & DHIS 2
updated
3. Physical Record Updated
Shri. A.N. Adkine
Dt. 06/12/2018
1. Instruct to Mothly rch
Data Updation
2. Instruct to DHIS-2 Data
Correction
3. Instruct to PMMVY PHC Level YES
PHC Chiroli & SC Kelzar
1. RCH Workplan Generation
2. Physical Record Updated
3. Delivary Point
4.pmmvy Updated
Shri. A.N. Adkine
Dt. 11/12/2018
1. Instruct to Mothly RCH
Data Updation
2. Instruct to DHIS-2 Data
Correction
3. Instruct to PMMVY PHC Level
YES
PHC Rajoli & SC Chimda
1. RCH Workplan Generation
2. Physical Record Updated
3. Delivary Point
4. PMMVY Quary updated
Shri. A.N. Adkine
Dt. 14/12/2018
1. Instruct to Mothly RCH
Data Updation
2. Instruct to DHIS-2 Data
Correction
3. Instruction to MR
Compain
SC Level YES
SC Chichala & SC
Yergaon
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
Shri. A.N. Adkine
Dt.19/12/2018
1. Instruct to Mothly RCH
Data Updation
2. Instruct to DHIS-2 Data
Correction
3. Instruct to PMMVY
4. Instruction to MR
Compain
PHC & SC Level YES
PHC Chiroli
1. RCH Due date updated
2. Physical Record Updated
3. Cleanness
4- pmmvy Updated
Shri. A.N. Adkine
Dt. 27/12/2018
1. Instruct to Mothly RCH
Data Updation
2. Instruct to Workplan
Generation
3. Instruct to PMMVY
3. Instruction to MR
Compain
SC Level YES
PHC Wadhona
SC Girgao
1) Discuss About MR
Vaccine Campain
2) Discuss about PMMVY
& other Yojna
3) Discuss About RKS
Expenditure.
Dr. Vinod Madavi
11/12/2018- PHC & SC NO -
PHC Moushi
SC Mendha
1) Discuss About MR
Vaccine Campain
2) Discuss about PMMVY
& other Yojna
3) Discuss About RKS
Expenditure.
Dr. Vinod Madavi
15/12/2018- PHC & SC NO -
PHC Talodhi
SC Govindpur
1) Discuss About MR
Vaccine Campain
2) Discuss about PMMVY
& other Yojna
3) Discuss About RKS
Expenditure.
Dr. Vinod Madavi
17/12/2018- PHC & SC NO -
District Chandrapur - DEO Mul
District Chandrapur - THO Nagbhid
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Balapur
SC Bond
1) Discuss About MR
Vaccine Campain
2) Discuss about PMMVY
& other Yojna
3) Discuss About RKS
Expenditure.
Dr. Vinod Madavi
21/12/2018- PHC & SC NO -
PHC Navego Pandav
SC Navkhada
1) Discuss About MR
Vaccine Campain
2) Discuss about PMMVY
& other Yojna
3) Discuss About RKS
Expenditure.
Dr. Vinod Madavi
26/12/2018- PHC & SC NO -
PHC Talodhi
SC Nanded
1) Verify Cashbook &
Grant Received
2) Verify all Registered
Maintain ( ANC , JSY,
FW, Delivery
Register)
3) Discuss about RKS
Expenditure.
Shri Prashant Junghare
12/12/2018 - PHC & SC NO -
PHC Moushi
SC Paharni
1) Verify Cashbook &
Grant Received
2) Verify all Registered
Maintain ( ANC , JSY,
FW, Delivery
Register)
3) Discuss about RKS
Expenditure.
Shri Prashant Junghare
14/12/2018 - PHC & SC NO -
SC kanpa
SC Gangasagar Heti
1) Verify Cashbook &
Grant Received
2) Verify all Registered
Maintain ( ANC , JSY,
FW, Delivery
Register)
Shri Prashant Junghare
19/12/2018 - SC NO -
SC Mohadi
SC Pardi Thavare
1) Verify Cashbook &
Grant Received
2) Verify all Registered
Maintain ( ANC , JSY,
FW, Delivery
Register)
Shri Prashant Junghare
26/12/2018 - SC NO -
District Chandrapur - Accountant Nagbhid
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Moushi
SC Mendha
1) Discuss About RCH
Data Entry & NEW DHIS
Data Entry.
2) Discuss About PMMVY
Data Entry
3) Verify HMIS Data Entry
4) Avalability Eqvipment &
Instrument
Shri Mukesh Gangamwar
11/12/2018 -PHC
SCNO
PHC Wadhona
SC Jivnapur
1) Discuss About RCH
Data Entry & NEW DHIS
Data Entry.
2) Discuss About PMMVY
Data Entry
3) Verify HMIS Data Entry
4) Avalability Eqvipment &
Instrument
Shri Mukesh Gangamwar
13/12/2018 -PHC
SCNO
SC Dongargao
SC Sawargao
1) Discuss About RCH
Data Entry & NEW DHIS
Data Entry.
2) Discuss About PMMVY
Data Entry
3) Verify HMIS Data Entry
4) Avalability Eqvipment &
Instrument
Shri Mukesh Gangamwar
17/12/2018 -SC
NO
SC Girgao
SC Kanhalgao
1) Discuss About RCH
Data Entry & NEW DHIS
Data Entry.
2) Discuss About PMMVY
Data Entry
3) Verify HMIS Data Entry
4) Avalability Eqvipment &
Instrument
Shri Mukesh Gangamwar
21/12/2018 - SC NO
Talodhi
SC Chindhichak
1) Verify Asha Record
Maintainance
2) Asha Immunization
Session
3) BF Visit At home leval &
Asha HBNC Visit
Shri Arvind Dadaji Kamdi
15/12/2018
1)Inform Asha to update
thair record & Adhar No.
& Bank acount no.
(2) BF to take visit at
beneficerise level
PHC
SCNO NO
District Chandrapur - DEO Nagbhid
District Chandrapur - BCM Nagbhid
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC wadhona
SC Girgao
1) Verify Asha Record
Maintainance
2) Asha Immunization
Session
3) BF Visit At home leval &
Asha HBNC Visit
Shri Arvind Dadaji Kamdi
19/12/2018
1)Inform Asha to update
thair record & Adhar No.
& Bank acount no.
(2) BF to take visit at
beneficerise level
PHC
SCNO NO
PHC Moushi
SC Mendha
1) Verify Asha Record
Maintainance
2) Asha Immunization
Session
3) BF Visit At home leval &
Asha HBNC Visit
Shri Arvind Dadaji Kamdi
21/12/2018
1)Inform Asha to update
thair record & Adhar No.
& Bank acount no.
(2) BF to take visit at
beneficerise level
PHC
SCNO NO
PHC Navegao Pandav
1) Verify Asha Record
Maintainance
2) Asha Immunization
Session
3) BF Visit At home leval &
Asha HBNC Visit
Shri Arvind Dadaji Kamdi
26/12/2018
1)Inform Asha to update
thair record & Adhar No.
& Bank acount no.
(2) BF to take visit at
beneficerise level
PHCNO NO
PHC Balapur
1) Verify Asha Record
Maintainance
2) Asha Immunization
Session
3) BF Visit At home leval &
Asha HBNC Visit
Shri Arvind Dadaji Kamdi
27/12/2018
1)Inform Asha to update
thair record & Adhar No.
& Bank acount no.
(2) BF to take visit at
beneficerise level
PHC NO NO
PHC Dewada
1) MVM Grant not
distibuted to SC
2)Grant not distibuted to
VHNSC
3)Cash Book not Updated
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 01/11/2018
Instruction given to
Medical Officer Facility levelYes
SC Bhurkunda
SC Pachgaon
1)Cash Book not Updated
2)MCTS Data Entry not
Updated
3) Cleanliness not
satisfactory
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 06/11/2018
Instruction given to
ANM Facility levelYes
SC Sasti 1
SC Sasti 2
1)Cash Book not Updated
2)MCTS Data Entry not
Updated
3) Cleanliness not
satisfactory
Dr.Ashok Jadhav
Taluka Health Officer
Rajura 01/12/2018
Instruction given to
ANM Facility levelYes
PHC Kadholi
1) Cleanliness not
satisfactory
2) Service book not
Updated
3)HA,ANM,MPW ATP
not found
Dr.Ashok Jadhav
Taluka Health Officer
Rajura 05/12/2018
Instruction given to
ANM Facility levelYes
District Chandrapur - THO Rajura
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Pandharpauni,
SC Pachgaon
1)Cash Book not Updated
2)MCTS Data Entry not
Updated
3) Cleanliness not
satisfactory
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 07/12/2018
Instruction given to
ANM Facility level Yes
PHC Chincholi
1)JSY Register not Updated
2)MCTS Data Entry not
Updated
3) Cleanliness not
satisfactory
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 11/12/2018
Instruction given to
Medical Officer Facility levelYes
SC Sindhi
SC Vihirgaona
1)MCTS Data Entry not
Updated
2)Cash Book not Updated
3) Institution Dilevery not
satisfactory
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 14/12/2018
Instruction given to
Medical Officer Facility levelYes
SC Temburvahi
SC Warur
1) Windows condition poor
2)Cash Book not Updated
3) MPW not visited in the
fild
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 18/12/2018
Instruction given to
Medical Officer Facility levelYes
PHC Dewada
1) RKS GB EC Meeting
Not Done
2)HA,ANM,MPW ATP not
found
3)Cash Book not Updated
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 21/12/2018
Instruction given to
Medical Officer Facility levelYes
SC Sonapur
1) Windows condition poor
2)Cash Book not Updated
3) MPW not visited in the
fild
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 26/12/2018
Instruction given to
Medical Officer Facility levelYes
SC Manoli
1) Windows condition poor
2)Cash Book not Updated
3) MPW not visited in the
fild
Dr. Ashok Jadhav
Taluka Health Officer
Rajura 28/12/2018
Instruction given to
Medical Officer Facility levelYes
PHC kadholi
1)Log Book not Updated
2)Stock Book not Updated
3) Grant Not Distibuted to
VHNSC
Shri.Vikram G.Kuril
Accountant THO Rajura
01/12/2018
Instruction given to
MO/Junior Clerk/Driver
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Chincholi
1) MVM Grant Not
Distibuted to SC
2) Stock book not Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
06/12/2018
Instruction given to
MO/Junior Clerk
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Dewada
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
13/12/2018
Instruction given to
MO/Junior Clerk
1) Facility level
2) Facility level
3) Facility level
Yes
District Chandrapur - Accountant Rajura
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Bhurkunda SC
Pachgaon
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
15/12/2018
Instruction given to
ANM & MPW
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Kadholi
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
17/12/2018
Instruction given to
MO/Junior Clerk
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Dewada
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
18/12/2018
Instruction given to
MO/Junior Clerk
1) Facility level
2) Facility level
3) Facility level
Yes
SC Pellora
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
28/12/2018
Instruction given to
ANM & MPW
1) Facility level
2) Facility level
3) Facility level
Yes
SC Bhurkunda bh.
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
29/12/2018
Instruction given to
ANM & MPW
1) Facility level
2) Facility level
3) Facility level
Yes
SC Subai
SC Vihirgaon
1) JSY Asha Incentive not
paid
2) Minuts book not
Updated
3)Fix Asset book not
Updated
Shri.Vikram G.Kuril
Accountant THO Rajura
31/12/2018
Instruction given to
ANM & MPW
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Chincholi
1) R15, R16 Ragister
verificetion
2) MCTS data entry
instruction
3) HMIS booklet
informetion
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 01/12/2018
Instruction given to
ANM & MPW Facility levelYes
SC Virur sta
1) R15, R16 Ragister
verificetion
2) MCTS data entry
instruction
3)RCH Ragister
verificetion
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 03/12/2018
Instruction given to
ANM & MPW Facility levelYes
SC Pandharpauni
1) RCH Ragister
verificetion
2) MCTS data entry
instruction
3) R15, R16 Ragister
verificetion
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 05/12/2018
Instruction given to
ANM & MPW Facility levelYes
District Chandrapur - DEO Rajura
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Dewada
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)RCH Ragister SC Kadholi
not complet
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 13/112/2018
Instruction given to
Medical Officer & ANM Facility levelYes
SC Manoli
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)OT not Started for FP
camp
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 14/12/2018
Instruction given to
Medical Officer & ANM Facility levelYes
SC Chunala
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)OT not Started for FP
camp
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 15/112/2018
Instruction given to
Medical Officer & ANM Facility levelYes
SC Sonapur
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)OT not Started for FP
camp
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 19/12/2018
Instruction given to
Medical Officer & ANM Facility levelYes
SC Arvi
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)OT not Started for FP
camp
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 28/12/2018
Instruction given to
Medical Officer & ANM Facility levelYes
PHC Kadholi
1) ANM Meeting for DHIS
2 Data entry informetion 2)
Jsy Ragister verificetion
3)Cleanliness & satisfactory
buliding
Ku.S.L. Pipare
Data Entry Opretor THO
Rajura 29/12/2018
Instruction given to
Medical Officer & ANM Facility levelYes
SC Chunala,
SC Chanakha
1)PPIUCD Cases Not
Motivated
2)Family Planning Cases
Not Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
03/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
SC Vihirgaon
SC Sindhi
1)SNCU Not Refferd
2)Family Planning Cases
Not Motivated
3)PPIUCD Cases Not
Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
06/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Chincholi
1)SNCU Not Refferd
2)Family Planning Cases
Not Motivated
3)PPIUCD Cases Not
Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
13/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Kadholi
1)PPIUCD Cases Not
Motivated
2)Family Planning Cases
Not Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
14/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
District Chandrapur - BCM Rajura
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC Chunala
1)PPIUCD Cases Not
Motivated
2)Family Planning Cases
Not Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
15/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
SC Chanakha
1)PPIUCD Cases Not
Motivated
2)Family Planning Cases
Not Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
18/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
SC Virur sta
1)SNCU Not Refferd
2)Family Planning Cases
Not Motivated
3)PPIUCD Cases Not
Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
26/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
SC Pellora
1)SNCU Not Refferd
2)Family Planning Cases
Not Motivated
3)PPIUCD Cases Not
Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
28/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
PHC Dewada
1)SNCU Not Refferd
2)Family Planning Cases
Not Motivated
3)PPIUCD Cases Not
Motivated
Ku.Sapana S.Chandekar
BCM THO Office Rajura
31/12/2018
Instruction given to
Asha/BF
1) Facility level
2) Facility level
3) Facility level
Yes
PHC Bothali
1. Financial Record
Updated
2. .JSY & FP Incentive
Inform. 3.
RKS EC Meeting
Information.
Shri Jitendra Ailanwar
Dt. 03/11/2018
1. All Records will be
prepread
2. Instruct to Audit
Information
PHC Level YES
PCH Pathari
1. Financial Record
Updated
2. .JSY & FP Incentive
Inform.
Shri Jitendra Ailanwar
Dt. 07/11/2018
1. All Records will be
prepread
2. Instruct toAudit
Information
PHC Level YES
SC Sonapur/Samda
1. Financial Record
Updated
2. .JSY Payment
information
Shri Jitendra Ailanwar
Dt. 17/11/2018
1. All Records will be
prepread
2. Instruct to Audit
Information
SC Level YES
PCH Jibgaon
1. Financial Record
Updated
2..JSY & FP Incentive
Inform. .
Shri Jitendra Ailanwar
Dt. 22/11/2018
1. All Records will be
prepread
2. Instruct to Audit
Information
PHC Level YES
SC Kawathi/Khedi
1. Financial Record
Updated
2. .JSY & FP Incentive
Inform.
Shri Jitendra Ailanwar
Dt. 26/11/2018
1. All Records will be
prepread
2. Instruct to Audit
Information
PHC Level YES
PHC Gunjewahi & Sc
Pawanpar
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
5.12.2018
Suggest To keep all
Record update And
properly and
start FW camp as soon as
possibel
PHC & sc yes
District Chandrapur - Accountant Saoli
District Chandrapur - THO Sindewahi
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Nawargaon & Sc
Pendhari
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3)Improve Institutional
delivery
Dr. Vinod K. Madavi
8.12.2018
Suggest To keep all
Record update And
properly improve
institutional delivery at
sc leval, JSY incentive
paid to all benificheri as
earlier
PHC & sc yes
PHC Mohadi & Sc Saradpar & Kalamgaon
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
11.12.2018
Suggest To keep all
Record update And
properly motivet to
coupel for use family
planning delivery at sc
leval,JSY incentive paid
to all benificheri as
earlier
PHC & sc yes
Sc Dongargaon &
Khatgaon
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
15.12.2018
Suggest To keep all
Record update And
properly and motivet to
peple for FW camp. All
incentive paid to
benifichery at SC & Phc
leval Start Fw Camp
Eairlier
SC yes
Sc Ratnapur
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
18.12.2018
Suggest To keep all
Record update And
properly improve
institutional delivery at
sc leval,JSY incentive
paid to all benificheri as
earlier
SC yes
PHC Wasera
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
19.12.2018
Suggest To keep all
Record update And
properly improve
institutional delivery at
sc leval,JSY incentive
paid to all benificheri as
earlier motivet to peple
for FW
sc yes
Sc Tekari & Navegaon
Loan
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
26.12.2018
Suggest To keep all
Record update And
properly improve
institutional delivery at
sc leval,JSY incentive
paid to all benificheri as
earlier
PHC yes
Sc TA.mendha
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Cleaning premises
Dr. Vinod K. Madavi
28.12.2018
Suggest To keep all
Record update And
properly and motivet to
peple for FW camp. All
incentive paid to
benifichery at SC & Phc
leval Start Fw Camp
earlier
SC yes
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
PHC Gunjewahi & Sc
Pawanpar
1) Record Updated
2) paid all jsy benifichery
Ms.Bharti M. Channurwar
5.12.2018
Suggest To Record
update paid all jsy
benifichery
SC&phc yes -
Phc Nawargaon
1) Record Updated
Maitained cash book
properly
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3)
Ms.Bharti M. Channurwar
6.12.2018
Suggest To keep all
Record update phc yes -
phc mohadi & wasera
1) Record Updated
Maitained cash book
properly
2) All Registered Maintain (
ANC, JSY, delivery
Register)
Ms.Bharti M. Channurwar
7.12.2018
Suggest To keep all
Record update And
properly sc yes
Phc Nawargaon
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
Ms.Bharti M. Channurwar
11.12.2018
Suggest To keep all
Record update And
properly sc yes
PhcGunjewahi
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
Ms.Bharti M. Channurwar
14.12.2018
Suggest To keep all
Record update And
properly sc yes
Sc Minghari & Ladbori
1) Record Updated
Maitained cash book
properly
2) All Registered Maintain (
ANC, JSY, delivery
Register)
Ms.Bharti M. Channurwar
15.12.2018
Suggest To keep all
Record update And
properly sc yes
Sc Dongargaon &
Khatgaon
1) Record Updated
2) All Registered Maintain (
ANC, JSY, delivery
Register)
3) Audit done last Quater
Ms.Bharti M. Channurwar
17.12.2018
Suggest To keep all
Record update sc yes -
SC DONGARGAON
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Shri.Pravin s. Mohurle
15.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
sc YES
PHC Nawargaon
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Shri.Pravin s. Mohurle
17.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
PHC YES
District Chandrapur - DEO Sindewahi
District Chandrapur - Accountant Sindewahi
Sl. No. Name of facility
Visited3 key Issues Identified
Reference (Report: name
of supervisor and date)
Action/s recommended
and agreed
Action to be taken at what level
(State, Division, District, Block,
Facility) and by whom
Action taken
(Yes/No)
Pending at
what level
SC KHATGAON
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Shri.Pravin s. Mohurle
18.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
SC YES
SC PAWANPAR
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Shri.Pravin s. Mohurle
20.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
SC YES
PHC Gunjewahi
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Mrs.Lata Raju Tadam
7.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
sc YES
PHC mohadi
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Mrs.Lata Raju Tadam
11.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
PHC YES
PHC nawargaon
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Mrs.Lata Raju Tadam
14.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
SC YES
PHC wasera
1)MCTS Entry Not
Completed
2)Rch ragister not
complited
Mrs.Lata Raju Tadam
24.12.2018
Suggest To Record
update compite all entry
of mother inRCH
PORTAL
SC YES