Circle Thane - M&E OFFICER District Raigad - DPM

258
Sl. No. Name of facility Visited 3 key Issues Identified Reference (Report: name of supervisor and date) Action/s recommended and agreed Action to be taken at what level (State, Division, District, Block, Facility) and by whom Action taken (Yes/No) Pending at what level SDH Bhiwandi 1.Review Taken About Less Expenditure 2.Taken Review adout MR 3.3.Delivery Perfomance is Satisfactory. Mrs.Neha Abitkar (CPM) Date 5.12.2018 Instruction given to MS MS Level yes No SDH Jawhar,PHC Sakashet 1.Review Taken About Less Expenditure 2.Taken Review about Sam & Mam Children 3.Taken Review of RKS EC & GB Meeting Mrs.Neha Abitkar (CPM) Date 14.12.2018 Instruction given to MS MS Level yes No Dho Thane 1.Review taken about annual Infrastructure report 2.Correction In Report of Hmis. 3.Taken Review about Rch Portal Data Entry Mrs.Heena Chavan(CM&E) Date:11.12.2018 Instruction given to District M&E & MIS Staff DHO LEVEL yes No SDH Dahanu 1.attend Epilipsy Camp 2.Taken Review adout MR 3.Taken Review about Sam & Mam Children Mrs.Heena Chavan(CM&E) Date:22.12.2018 Instruction given to MS MS Level yes No SDH Pen 1-Periodic Paste control & antitermile treatment was not done 2- Seprate Two wheeler and Four wheeler parking were not seen 3- Infection control committee was not established District Programme Manager, Raigad Dr. Nilesh Kokare ,11-01-2018 1- Disscused with Staff about periodic ntitermile treatment & Paste control 2- Disscused with Staff about eprate Two wheeler and Four wheeler parking 3 - Disscused with MO about establishment of Infection control committee & periotical meetings of it with minutes writings SDH level No SDH level Circle Thane - CPM Circle Thane - M&E OFFICER District Raigad - DPM

Transcript of Circle Thane - M&E OFFICER District Raigad - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH Bhiwandi

1.Review Taken About Less

Expenditure

2.Taken Review adout MR

3.3.Delivery Perfomance is

Satisfactory.

Mrs.Neha Abitkar (CPM)

Date 5.12.2018Instruction given to MS MS Level yes No

SDH Jawhar,PHC

Sakashet

1.Review Taken About

Less Expenditure 2.Taken

Review about Sam & Mam

Children

3.Taken Review of RKS EC

& GB Meeting

Mrs.Neha Abitkar (CPM)

Date 14.12.2018Instruction given to MS MS Level yes No

Dho Thane

1.Review taken about

annual Infrastructure report

2.Correction In Report of

Hmis.

3.Taken Review about Rch

Portal Data Entry

Mrs.Heena

Chavan(CM&E)

Date:11.12.2018

Instruction given to

District M&E & MIS

Staff

DHO LEVEL yes No

SDH Dahanu

1.attend Epilipsy Camp

2.Taken Review adout MR

3.Taken Review about Sam

& Mam Children

Mrs.Heena

Chavan(CM&E)

Date:22.12.2018

Instruction given to MS MS Level yes No

SDH Pen

1-Periodic Paste control &

antitermile treatment was

not done 2- Seprate Two

wheeler and Four wheeler

parking were not seen 3-

Infection control committee

was not established

District Programme

Manager, Raigad Dr. Nilesh

Kokare ,11-01-2018

1- Disscused with Staff

about periodic ntitermile

treatment & Paste

control 2- Disscused with

Staff about eprate Two

wheeler and Four

wheeler parking 3 -

Disscused with MO

about establishment of

Infection control

committee & periotical

meetings of it with

minutes writings

SDH level No SDH level

Circle Thane - CPM

Circle Thane - M&E OFFICER

District Raigad - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

KolhapurAudit Complience

Submitting

District Accounts

Manager, Raigad Mr.

Santosh Patil ,3 &

4/12/2018

Mangaon & Mahad

Audit Para Complience

18/12/2018Audit Para Compliance

should be submitteTho level No THO Level

SDH Pen

RKS Record Cheking &

Sickle cell programme

rewive

Mrs. Priti Patil ,21-12-2018 Instructed about Staff SDH level NO SDH level

Pen Instructed HMIS & DHIS

Report correction

M&E Officer, Raigad Mrs.

Jayshri Mokal ,29-12-2018

Instructed HMIS &

DHIS Report correction Tho level No PHC level

SDH Dahanu SDH VisitDr. Kanchan N. Wanere,

CS Palghar, 03/12/2018 SDH Visit At Facility Yes No

RH Vikramgad, SDH

KasaRH, SDH Visit

Dr. Kanchan N. Wanere,

CS Palghar, 10/12/2018RH, SDH Visit At Facility Yes No

RH Virar, RH Manor RH VisitDr. Kanchan N. Wanere,

CS Palghar, 21/12/2018RH Visit At Facility Yes No

RH Wangaon, RH Boisar RH VisitDr. Kanchan N. Wanere,

CS Palghar, 22/12/2018RH Visit At Facility Yes No

SDH Jawhar, RH

MokhadaSDH, RH Visit

Dr. Kanchan N. Wanere,

CS Palghar, 27/12/2018SDH, RH Visit At Facility Yes No

RH Talasari RH VisitDr. Kanchan N. Wanere,

CS Palghar, 29/12/2018RH Visit At Facility Yes No

PHC Gorha, PHC Kurze,

SC KhutalPHC,SC Visit

Dr. Dayanand Suryavanshi,

DHO, Palghar, 05/12/2018PHC,SC Visit At Facility Yes No

PHC Bhatane, SC Haloli,

SC DekalePHC,SC Visit

Dr. Dayanand Suryavanshi,

DHO, Palghar, 07/12/2018PHC,SC Visit At Facility Yes No

PHC Jamsar, SC Bhopoli, PHC,SC VisitDr. Dayanand Suryavanshi,

DHO, Palghar, 11/12/2018PHC,SC Visit At Facility Yes No

PHC Jamsar, PHC

Sakharshet, SC DabosaPHC,SC Visit

Dr. Dayanand Suryavanshi,

DHO, Palghar, 12/12/2018PHC,SC Visit At Facility Yes No

PHC Talwada, PHC

Malwada, SDH KasaPHC, SDH Visit

Dr. Dayanand Suryavanshi,

DHO, Palghar, 18/12/2018PHC, SDH Visit At Facility Yes No

THO Dahanu, PHC

Chandranagar, PHC

Aina, PHC Chinchani

PHC,THO VisitDr. Dayanand Suryavanshi,

DHO, Palghar, 27/12/2018PHC,THO Visit At Facility Yes No

PHC Jamsar, PHC

Sakharshet, PHC TalwadaPHC, Visit

Dr. Dayanand Suryavanshi,

DHO, Palghar, 28/12/2018PHC, Visit At Facility Yes No

District Raigad -

District Raigad - M&E OFFICER

District Palghar - CS

District Palghar - DHO

District Raigad - DAM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Viramgad, PHC

MalwadaTHO, PHC Visit

Dr. Milind Chavan,

DRCHO, Palghar,

03/12/2018

THO, PHC Visit At Facility Yes No

PHC Ashagad, PHC

Ganjad, SC JamshetPHC, SC Visit

Dr. Milind Chavan,

DRCHO, Palghar,

11/12/2018

PHC, SC Visit At Facility Yes No

PHC Sakharshet, PHC

SakurPHC Visit

Dr. Milind Chavan,

DRCHO, Palghar,

18/12/2018

PHC Visit At Facility Yes No

PHC Durvesh, PHC

Somta, SC Nanndgaon 2PHC, SC Visit

Dr. Milind Chavan,

DRCHO, Palghar,

026/12/2018

PHC, SC Visit At Facility Yes No

PHC Sutrakar, PHC Wasa PHC Visit

Dr. Milind Chavan,

DRCHO, Palghar,

31/12/2018

PHC Visit At Facility Yes No

RH Viramgad, RH Wada RH VisitDr. R. S. Kelkar, ACS

Palghar, 06/12/2018RH Visit At Facility Yes No

SDH Kasa SDH VisitDr. R. S. Kelkar, ACS

Palghar, 14/12/2018SDH Visit At Facility Yes No

RH Manor, RH Boisar RH VisitDr. R. S. Kelkar, ACS

Palghar, 24/12/2018RH Visit At Facility Yes No

RH Virar RH VisitDr. R. S. Kelkar, ACS

Palghar, 27/12/2018RH Visit At Facility Yes No

RH Mokhada, SDH

JawharRH, SDH Visit

Dr. R. S. Kelkar, ACS

Palghar, 31/12/2018RH, SDH Visit At Facility Yes No

SDH Jawhar Kayakalp Peer assesment

Abhijit Debadvar DPM

,Palghar

14/12/2018

Gap finding done as

per Kayakalp norms by

assessor

Facility Level Yes No

SDH Kasa Visit

Abhijit Debadvar DPM

,Palghar

20/12/2018

Report checked and

varified, line list checkedFacility Level Yes No

SDH Kasa Visit

Abhijit Debadvar DPM

,Palghar

31/12/2018

Report checked and

varified, line list checkedFacility Level Yes No

THO Wada MPW Check listRajendra V Butte M&E,

Palghar 28/12/2018Visit Facility Level Yes No

THO Jawhar MPW Check listChirag S Bari SI, Palghar

28/12/2018Visit Facility Level Yes No

MPW Check list

Kramisha D Gaikwad,

IDSP Co-

ordinator,Palghar,28/12/20

18

Visit Facility Level Yes No

Phc tarapur, School mr supervisionSapana Pawar DCM,

Palghar 04/12/2018Visit Facility Level yes Yes

District Palghar - DPM

District Palghar - M&E OFFICER

District Palghar - SI

District Palghar - IDSP Co.

District Palghar - DCM

District Palghar - DRCHO

District Palghar - ACS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

District Training Cente vhnsc Training Sapana Pawar DCM,

Palghar 14/12/2018Visit Facility Level yes Yes

Vasai Virar Cororation Asha YojnaSapana Pawar DCM,

Palghar 15/12/2018Visit Facility Level yes Yes

District Training Cente PME TrainingSapana Pawar DCM,

Palghar 18/12/2018Visit Facility Level yes Yes

District Training Cente PME TrainingSapana Pawar DCM,

Palghar 20/12/2018Visit Facility Level yes Yes

District Training Cente PME TrainingSapana Pawar DCM,

Palghar 18/12/2018Visit Facility Level yes Yes

District Training Cente Asha Software TrainingSapana Pawar DCM,

Palghar 27/12/2018Visit Facility Level yes Yes

District Training Cente Asha Software TrainingSapana Pawar DCM,

Palghar 28/12/2018Visit Facility Level yes Yes

Palghar Durvesh phc

Arati R.Patil.rks/sickle cell

co-ordinator palghar Date-

01/12/2018

RH PALGHAR-1)Cash

book should be signed by

authorised person2)

voucher not signed by

authorised person .( Dr.

Manghnale)Muster not

available PHC

DURVESH-MR Vaccine

camp

At Facility YES No

jawhar SDH Jawhar

Arati R.Patil.rks/sickle cell

co-ordinator palghar

Date14/12/2018

1)Only one meeting held

for both Governing &

Executive 2)sickle cell

monthly meeting

At Facility YES No

vikramgad BTT Vikramgad

Arati R.Patil.rks/sickle cell

co-ordinator palghar Date-

15/12/2028

vishwas Abhiyan trening At Facility YES No

Palghar DDT PALGHAR

Arati R.Patil.rks/sickle cell

co-ordinator palghar Date-

17/12/2018

vishwas Abhiyan trening At Facility YES No

Dahanu SDH DAHANU

Arati R.Patil.rks/sickle cell

co-ordinator palghar Date-

28/12/2018

sickle cell monthly

meeting At Facility YES No

Jawhar VISIT TO SDH JawharSachin Dagale JE, Dho

Office Palghar 01/12/2018SITE VISIT With E.E sir & D.E sir Site Visit YES No

District Palghar - Jr.Engineer

District Palghar - RKS & Sickle Cell Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Talasari VISIT TO PHC UdhavaSachin Dagale JE, Dho

Office Palghar 08/12/2018SITE VISIT For Ground beam checking YES No

Palghar VISIT TO PHC EdvanSachin Dagale JE, Dho

Office Palghar 12/12/2018SITE VISIT

For PHC main building water

proofing workYES No

Talasari VISIT TO PHC UdhavaSachin Dagale JE, Dho

Office Palghar 18/12/2018SITE VISIT For Ground beam concreting YES No

Mokhada VISIT TO MokhadaSachin Dagale JE, Dho

Office Palghar 24/12/2018SITE VISIT For HWC survey YES No

Mokhada VISIT TO MokhadaSachin Dagale JE, Dho

Office Palghar 25/12/2018SITE VISIT For HWC survey YES No

Jawhar VISIT TO JawharSachin Dagale JE, Dho

Office Palghar 26/12/2018SITE VISIT For HWC survey YES No

Talasari VISIT TO TalasariSachin Dagale JE, Dho

Office Palghar 27/12/2018SITE VISIT For HWC survey YES No

Dahanu VISIT TO SDH JawharKaran Mokashi. JE,DHO

office palghar 01/12/2018SITE VISIT Site visit with E.E.& D.E.sir YES No

VikramgadhVISIT TO SC Shil

Bhopoli,chinchghar

Karan Mokashi. JE,DHO

office palghar 05/12/2018SITE VISIT

Site visit At SC Shil, Bhopoli,

Chinchghar for HWC workYES No

VikramgadhVISIT TO SC Moho

Bhopoli,medhi, Chinchghar

Karan Mokashi. JE,DHO

office palghar 15/12/2018SITE VISIT

Site visit At SC Shil, medhi,

Chinchghar,moho for HWC workYES No

VikramgadhVISIT TO PHC

Kurze,malwada,talwada

Karan Mokashi. JE,DHO

office palghar 18/12/2018SITE VISIT HWC survey with E.E. sir & D.E.sir YES No

DahanuVISIT TO PHC Aina &

Ashagadh with SC

Karan Mokashi. JE,DHO

office palghar 24/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

DahanuVISIT TO PHC Ganjad &

tawa with SC

Karan Mokashi. JE,DHO

office palghar 25/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

DahanuVISIT TO PHC Saiwan

with iternal SC

Karan Mokashi. JE,DHO

office palghar 26/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

Palghar VISIT TO PHC EdvanKaran Mokashi. JE,DHO

office palghar 27/12/2018SITE VISIT Second MO slab casting YES No

District Palghar - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Vikramgadh

VISIT TO PHC

malwada,talwada with

internal sub center

Sham savar. JE,DHO office

palghar 24/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

VikramgadhVISIT TO PHC kurze with

internal sub center

Sham savar. JE,DHO office

palghar 25/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

JawharVISIT TO PHC Jamsar with

internal sub center

Sham savar. JE,DHO office

palghar 26/12/2018SITE VISIT For HWC Survey with D.E.sir YES No

Palghar VISIT TO PHC EdvanSham savar. JE,DHO office

palghar 27/12/2018SITE VISIT Second MO slab casting YES No

PHC Rui Chatrapati

Block Parner

Dist Nagar

1.HMIS data is qualitatively

good

2. Delivery are good but

most of ANC are not ready

to stay there for 48 hrs

3. Conduct the validation

commity meeting for

improving the qulity of hmis

data

S.S.Gawande (Nashik

Circle M & E )

Date:-06/12/2018

look after RCH Portal

data Registration.

Encourage ANC to stay

for 48 hrs

Facility by M.O.,ANM,MPW yes

SC Hanga

1. PHC give workplan to

SC & Sc take follow up

according to workplan.

2. In DHIS facilitys enter

the data by timely but ANM

is confused between IUD &

PPIUCD

3. Conduct the validation

commity meeting at sc and

phc level for improving the

qulity of hmis data

S.S. Gawande (Nashik

Circle M & E )

Date:-06/12/2018

Update the services in

RCH portal using real

time data entry. In DHIS

Check the validation

error at facility level and

correct it by timely.Also

told difference between

IUD & PPIUCD

Facility by ANM,MPW yes

RH Parner

1.JSSK board is not in front

lobby

2.employee got confused for

102,104,108

3.Include data for Private &

public e.g. live

birth,delivery in public

S.S.Gawande(Nashik Circle

M & E )

Date:-06/12/2018

give the Instuction to

anm,Mpw about private

& public facility

work,Jssk &

102,104,108

Facility by MS,Staff nurse yes

1. PHC Pimpalgaon

Tl. Bhusawal

Dist. Jalgaon

1. Surrounding was not

clean and maintened

2. RKS Meeting was not

conducted

3. RCH Portal workplan is

given to all sc.

Shri. Sandeep Gawande

CMEO, Nashik

Date:- 15/12/2018

1. Ask them to place and

maintain the Timetable

in Display area.

2. IEC Material of JSSK,

I04, and other asked to

display

3. Asked the ANM to

update the AMG & UF

Record.

Facility Level MO ANM Yes

District Palghar - Jr.Engineer

Circle Nashik - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

2. SC Talwel

Tl. Bhusawal

Dist. Jalgaon

1. Validation error

committee are conducted

but no record maitain.

2. AMG & UF record was

not updated

3. Field visit of the SC

record not available

Shri. Sandeep Gawande

CMEO,Nashik

Date:-15/12/2018

1. Instruct them to keep

record for error

committee meeting.

2. Asked them to update

the record of AMG & UF

3. Asked them to update

the Field visit Register

Facility ANM , MPW Yes

3. SC Vazarkheda

Tal. Bhusawal

Dist. Jalgaon

1. ANM is confuse betn

104,108,102

2. Cash Book was not

updated

3. Timetable of

Immunisation was not

displayed in the open area.

Shri.Sandeep Gawande

CMEO,Nashik

Date:-15/12/2018

1. Asked them to display

the time table in open

area & display what is

102,104,108

2. Ask them to maintain

the cashbook

Faclity ANM , MPW YES

1.RH Akkalkuwa

Dist. Nandurbar

Medical & Dental Camp.

Total Patient - 570

IPD -17

Surgery - 19

Shri. Ranjeet Chindhu

Pawar

CPM, Nashik Circle,

Nashik

Date:-03-12-2018

Asked the concerned to

display the updated IEC ____ ____ ____

2. RH Kotul,

Dist.Ahmadnagar

1. Planning of the Medical

& Dental camp

Shri. Ranjeet Chindhu

Pawar

CPM, Nashik Circle,

Nashik

Date:-12-12-2018

1. Asked the concerned

to display 108/102/104 in

frontal area.

2. Internal Cleanlines to

be Maintained on regular

3.Asked the concerned

for outside cleanliness.

4. Giving information

about Medical & Dental

camp Guidline

District & Block Yes ____

Surgana

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

06/12/2018

Discussion with MS,

MO,AS, SN, Yes

Yeola, Niphad

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

8/12/2018

Discussion with MS,

MO,AS, SN, Yes

Malegaon, Chandwad

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

9/12/2018

Discussion with MS,

MO,AS, SN, Yes

Circle Nashik - CPM

District Nashik - CS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Malegaon

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

10/12/2018

Discussion with MS,

MO,AS, SN, Yes

Malegaon, Dabhadi

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

12/12/2018

Discussion with MS,

MO,AS, SN, Yes

Ghoti, Igatpuri

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

22/12/2018

Discussion with MS, ,

MO, SN, AS Yes

Harsul

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

23/12/2018

Discussion with MS, ,

MO, SN, AS Yes

Ghoti, Igatpuri

M.R. Reviwe, NHM

Reviwe, NHM Expenditure

Review. Mistakes in HMIS

Data, JSSK Pickup, Drop

Back Review. NCD

Program Review, RBSK

Program, HR

Review,Hospital Services

Reviwe

Dr.S.P. Jagdale, CS,

28/12/2018

Discussion with MS, ,

MO, SN, AS Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Igatpuri, Ghoti

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

04/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Malegaon

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

05/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Niphad. Lasalgaon

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

07/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Igatpuri, Ghoti

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

11/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

District Nashik - RMO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Igatpuri, Ghoti

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

15/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Satana

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

17/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Trimbak

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

20/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Nandgaon Manmad

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

22/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Yeola

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

24/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Bhagur, Deolali Cmap

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

26/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Igatpuri, Ghoti

Measle Rubela Program

Visit , Finding for F.P.

Cases, NHM Reviwe,

NHM Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Hospital Services Reviwe,

RH Nagarsul Inquery

Routine Immunization

Dr.A.B. Pawar, RMO (or)

28/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Chandwad, Umrane

Measle Rubela Program ,

Finding for F.P. Cases,

NHM Reviwe, NHM

Expenditure Review.

Mistakes in HMIS Data,

JSSK Pickup, Drop Back

Review. NCD Program

Review, HR Review,

Routine Immunization

review, Hospital Services

Reviwe Routine

Immunization

Dr.A.B. Pawar, RMO (or)

29/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

UmraneRural Hospital inauguration

Prepration

Dr.A.B. Pawar, RMO (or)

30/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Umrane Rural Hospital inaugurationDr.A.B. Pawar, RMO (or)

31/12/2018

Discussion with MS,

MO, A.S, Incharg sister, Facility Yes

Deolali, Bytco Hospital MR VisitDr.Ravindra Chaudhari,

DRCHO, 1/12/2018

Discussion with TMO

& MO

Talegaon Dindori,

Varkheda, Kadva

Karkhana, Nigdol, Umrale

MR VisitDr.Ravindra Chaudhari,

DRCHO, 5/12/2018

Discussion with TMO

& MO

Adgaon, Chandwad,

Saundane, Malegaon,

Vadner

MR VisitDr.Ravindra Chaudhari,

DRCHO, 10/12/2018

Discussion with TMO

& MO

PHC Bolthan, PHC

PimparkhedFinancial Record Checking

Sandip Jadhav, DAM,

04/12/2018

Discussion with TMO

& MO

Deola, Khuntewadi VisitVishal Naidu, M&E

Officer, 4/12/2018

Discussion with TMO

& MO

Meshi, Lohoner Visit Avinash Shinde, 4/12/2018

Vaitarna VisitAvinash Shinde,

21/12/2018

SC Vilholi Madhyamik

School, Aashram SchoolMR campagian Supervision

Dr.K.R.Bhoye

THO, 03/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHYes

Phc Jategaon

PHC Supervision, MR

Campagian Supervision,

Kayakalp Preparetion visit

Dr.K.R.Bhoye

THO, 03/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHYes

Devlali Hospital , Devlali

Highschool MR Campaiagn Supervioin

Dr.K.R.Bhoye

THO, 04/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHYes

RH Girnare, PHC

DhondegaonMR Campaiagn Supervioin

Dr.K.R.Bhoye

THO, 04/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHyes

Mumbai MCCOD Workshop

Dr.K.R.Bhoye

THO, 10/12/2018

11/12/2018

District Level and Phc

Level

At Facility level by PHC MO Block

Level by EOHYes

Sandarbha Seva Hospital

Launching of Intervention

to strengthen cancer

programme, NCD

programme Review

Dr.K.R.Bhoye

THO, 12/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHyes

RH Girnare,AFP and VPD Survillance

reporting,

Dr.K.R.Bhoye

THO, 17/12/2018

disscussion with MO,

HA ANM MPW

At Facility level by PHC MO Block

Level by EOHYES

Sc Girnare Anganwadi

Girnare

Sc Inspetion, MR

Supervision

Dr.K.R.Bhoye

THO, 17/12/2018

disscussion with MO,

HA ANM MPW,

Anganwadi worker

At Facility level by PHC MO Block

Level by EOHYes

District Nashik - DRCHO

District Nashik - DAM

District Nashik - M&E OFFICER

District Nashik -

District Nashik - THO Nashik

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Bhagur Nagarpalika

Dispensory and High Risk

Area Visit

MR Campagian SupervisionDr.K.R.Bhoye

THO, 19/12/2018

disscussion with MO,

HA ANM MPW,

Anganwadi worker

At Facility level by PHC MO Block

Level by EOHYes

Dhondegaon PHC expenses report collecttion S.H.Patil Acc 01/12/2018discussion with M.O

and BFAt phc Level

phc sayyad pimri expenses report collecttion S.H.Patil Acc 03/12/2018 discussion with clerk At phc Level

Jatgaon PHC pfms work jsy S.H.Patil Acc 05/12/2018discussion with M.O

and H.AAt phc Level

uphc devlali MR Campaiagn Supervioin S.H.Patil Acc 06/12/2018discussion with M.O

and H.Aand A.N.M.At phc Level

Shinde phc MR Campaiagn Supervioin S.H.Patil Acc 07/12/2018discussion with M.O

and H.Aand A.N.M.At phc Level

Shinde phcpfms work jsy cash book

chekingS.H.Patil Acc 10/12/2018 discussion with clerk At phc Level

Jatgaon PHC pfms work RKS S.H.Patil Acc 15/12/2018 discussion with clerk At phc Level

Dhondegaon PHC MR Campaiagn Supervioin S.H.Patil Acc 20/12/2018discussion with M.O

and H.Aand A.N.M.At phc Level

phc sayyad pimri pfms work jsy S.H.Patil Acc 24/12/2018discussion with M.O

and B.FAt phc Level

Shinde phc pfms work for Asha and fp S.H.Patil Acc 29/12/2018 discussion with clerk At uphc Level

phc sayyad pimri pfms work for Asha and fp S.H.Patil Acc 31/12/2018 discussion with clerk At phc Level

Pimplad SC MR Ralily S.A.Kadam, BCM,

1/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Vilholi SC , Bajrangwadi MR Session VisitS.A.Kadam, BCM,

03/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Belgoandhaga SC MR Session VisitS.A.Kadam, BCM,

04/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Mahirawani SC MR Session VisitS.A.Kadam, BCM,

05/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Talegaon SC MR Session VisitS.A.Kadam, BCM,

11/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Belgoandhaga SC MR Session VisitS.A.Kadam, BCM,

13/12/2018

discussion with ANM,

BF, Asha & BenifishierAt SC Level Yes

Sayyid Pimpri PHCHBNC Home Visit & Asha

& BF work Review

S.A.Kadam, BCM,

14/12/2018

discussion with MO,

LHV,HA,Asha,BFAt PHC Level Yes

Wasaligaon MR Session VisitS.A.Kadam, BCM,

19/12/2018

discussion with MO,

LHV,HA,Asha,BFAt SC Level Yes

Jategaon Asha & BF work Review

Monthly Meeting

S.A.Kadam, BCM,

21/12/2018

discussion with MO,

LHV,HA,Asha,BFAt PHC Level Yes

District Nashik - Accountant

District Nashik - BCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Vilholi SC MR Session VisitS.A.Kadam, BCM,

24/12/2018

discussion with MO,

LHV,HA,Asha,BFAt Disti. Level Yes

Shinde PHCAsha & BF work Review

Monthly Meeting

S.A.Kadam, BCM,

26/12/2018

discussion with MO,

LHV,HA,Asha,BFAt PHC Level Yes

Sayyaid Pimpri PHCAsha & BF work Review

Monthly Meeting

S.A.Kadam, BCM,

28/12/2018

discussion with MO,

LHV,HA,Asha,BFAt PHC Level Yes

Dhondegaon PHCAsha & BF work Review

Monthly Meeting

S.A.Kadam, BCM,

29/12/2018

discussion with MO,

LHV,HA,Asha,BFAt PHC Level Yes

Nashik HMIS, RCH, PMMVY, MRDr. M J Daware DEO,

Igatpuri, 6/12/2018DHO office Meeting

Titoli Nandgaonsado MR, HMIS PMMVYDr. M J Daware DEO,

10/12/2018

MR Visit and PHC

PMMVY HMIS

reporting

Ghoti Igatpuri MR, HMIS RCHDr. M J Daware DEO,

11/12/2018MR, HMIS RCH Visit

Wadivarhe MR HMIS RCH PMMVYDr. M J Daware DEO,

13/12/2018

MR HMIS RCH

PMMVY

Dhamangaon MR HMIS RCH PMMVYDr. M J Daware DEO,

14/12/2018

MR HMIS RCH

PMMVY

Wadivarhe MR HMIS RCH PMMVYDr. M J Daware DEO,

19/12/2018

MR HMIS RCH

PMMVY

Belgaonkurhe MR HMIS RCH PMMVYDr. M J Daware DEO,

21/12/2018

MR HMIS RCH

PMMVY

Dhamangaon MR HMIS RCH PMMVYDr. M J Daware DEO,

26/12/2018

MR HMIS RCH

PMMVY

Dhule Corporation

NUHM Office Kutumb

Kalyan Hospital Dhule

RCH & HMIS Work VisitP P Wani ( M &

E Officer 01/12/2018 ) …….. facility level yes _

Dhule THO Office Dhule RCH & HMIS Work VisitP P Wani ( M &

E Officer 03/12/2018 ) …….. facility level yes _

Sakri THO Office RCH & HMIS Work VisitP P Wani ( M &

E Officer 07/12/2018 ) …….. facility level yes _

Shirpur THO Office,

NUHM Shirpur SDH &

Council Shirpur

RCH & HMIS Work VisitP P Wani ( M &

E Officer 11/12/2018 ) …….. facility level yes _

THO office Shindkheda RCH & HMIS Work VisitP P Wani ( M &

E Officer 17/12/2018 ) …….. facility level yes _

District Nashik - Igatpuri DEO

District Dhule - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Sakri THO Office & SDH

Dondaicha Council

Dondaicha

RCH & HMIS Work VisitP P Wani ( M &

E Officer 20/12/2018 ) …….. facility level yes _

PHC Dusane & THO

SakriAudit Compaliance

Prashant Yeole

( DAM & BFO) 02/12/2018

)

…….. facility level yes _

THO Office Shindkheda

PHC BetavadAudit Compaliance

Prashant Yeole

( DAM & BFO) 16/12/2018

)

…….. facility level yes _

THO Dhule & PHC Arvi Balance Sheet

Prashant Yeole

( DAM & BFO)

20/12/2018 )

…….. facility level yes _

PHC Kapadan & THO

SakriAudit Compaliance

Prashant Yeole

( DAM & BFO) 27/12/2018

)

…….. facility level yes _

Dhule Corporation

NUHM Office Kutumb

Kalyan Hospital Dhule

PMMVY Work & ASHA

information and Visit

Mayur A Marathe RBSK (

DPC - PMMVY

01/12/2018 )

…….. facility level yes _

Dhule THO Office Dhule

PMMVY Beneficiary Form

collection Work & THO

discussion of pmmvy

meeting 4.12.18

Mayur A Marathe ( DPC -

PMMVY 3/12/2018 ) …….. facility level yes _

State Office Pune PMMVY Meeting &

Workshop attend at Pune

Mayur A Marathe ( DPC -

PMMVY 4/12/2018 ) …….. facility level yes _

Sakri THO Office

PMMVY Work information

and Visit

ASHA, BF Meeting of

PMMVY Work

Mayur A Marathe ( DPC -

PMMVY 7/12/2018 ) …….. facility level yes _

Dhule Corporation

NUHM Office Kutumb

Kalyan Hospital Dhule

PMMVY Work information

and Visit MOH Office

Meeting 10.12.2018 attend

Mayur A Marathe ( DPC -

PMMVY 10/12/2018 ) …….. facility level yes _

Shirpur THO Office,

NUHM Shirpur SDH &

Council Shirpur

PMMVY Work information

and Visit THO Office Out

Source DEO HA Meeting

11.12.2018 attend

Mayur A Marathe ( DPC -

PMMVY 11/12/2018 ) …….. facility level yes _

Dhule Corporation

NUHM Office Kutumb

Kalyan Hospital Dhule

PMMVY JSY DATA

Collect Work NUHM

Office Corporation Dhule

Mayur A Marathe ( DPC -

PMMVY 12/12/2018 ) …….. facility level yes _

Dhule Corporation

NUHM Office Kutumb

Kalyan Hospital Dhule

PMMVY Work & VisitMayur A Marathe ( DPC -

PMMVY 14/12/2018 ) …….. facility level yes _

District Dhule - DAM

District Dhule - RBSK Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Shirpur THO Office,

NUHM Shirpur SDH &

Council Shirpur

PMMVY Work information

and Visit THO Office

ASHA, BF Meeting

17.12.2018 attend 2 & 3 rd

installment due list etc work

Mayur A Marathe ( DPC -

PMMVY 17/12/2018 ) …….. facility level yes _

Sakri THO Office & SDH

Dondaicha Council

Dondaicha

PMMVY JSY DATA Work

information and Visit

Mayur A Marathe ( DPC -

PMMVY 20/12/2018 ) …….. facility level yes _

Dhule Corporation

NUHM Office

PMMVY Work information

and Visit & V C 21.12.18

Information

Mayur A Marathe ( DPC -

PMMVY 21/12/2018 ) …….. facility level yes _

Sakri THO Office

PMMVY Work information

and Visit

Out Source DEO Clerk

Meeting 26.12.18 attend &

PMMVY Portal Training

Work 2 & 3 rd installment

due list etc work

Mayur A Marathe ( DPC -

PMMVY 26/12/2018 ) …….. facility level yes _

Shirpur THO Office,

NUHM Shirpur SDH &

Council Shirpur

PMMVY Work information

and Visit

PMMVY SO Approval

Training Work of MO

NUHM Office

Mayur A Marathe ( DPC -

PMMVY 27/12/2018 ) …….. facility level yes _

Dhule THO Office &

Corporation Dhule

PMMVY Work information

and Visit

Budit Majuri Information

and Corporation Area V C

2.1.19 information of MOH

Mayur A Marathe ( DPC -

PMMVY 31/12/2018 ) …….. facility level yes _

SDH Muktainagar Audit Complience Shri.Nilesh B Patil (DAM)

13.12.2019

Instruction given to

MS,Clerk Facility Level Yes No

THO/SDH Muktainagar Audit Complience & PFMS Shri.Nilesh B Patil (DAM)

21.12.2019

Instruction given to

MS,Clerk Facility Level Yes No

SC Nachankheda, Nandra,

Khadgaon,Shahapur, Neri

Digar,THO Jamner

HWC SC Visit with State

Consultant At Jamner Block

Mr.Kishor P.Patil (Dist M

& E Officer) 14/12/2018

Instruction to THO, MO,

SN, ANM, Facility Level Yes --

District Jalgaon - DAM

District Jalgaon - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Parola, RH Parola

1) In RCH Portal EC, ANC

& Child entry must done as

early as possible. 2)

Monthly HMIS/DHIS Data

must be filled within time

limit as well as correctly.

Remove all critical data,

outliers from HMIS

Portal.3) PMMVY Entry

done on time to time

Mr.Kishor P.Patil (Dist M

& E Officer) 18/12/2018

Instruction to THO, MS,

MO, SN, ANM, Facility Level Yes --

1]BHUSAWAL NEW WORK UPHC

DINDALYL NAGAR

Mr.Yogesh N.Jaware

(Junior Engineer)

04.12.2018

WORK IS STOP ,SAND

NOT AVAILBLE

DISCUSSING WITH

CONTRACTORYES

2]RAVER AINPUR PHC VISIT

Mr.Yogesh N.Jaware

(Junior Engineer)

06.12.2018

NEW STAFF

QUARTER WORK

DISCUSSING WITH MEDICAL

OFFICER YES

3]JALGAON MHASAWAD PHC

Mr.Yogesh N.Jaware

(Junior Engineer)

07.12.2018

NEW LEBOUR

RENOVATION WORK

DISCUSSING WITH MEDICAL

OFFICER YES

4]BHUSAWALNEW WORK UPHC

DINDALYL NAGAR

Mr.Yogesh N.Jaware

(Junior Engineer)

11.12.2018

WORK IS STOP ,SAND

NOT AVAILBLE

DISCUSSING WITH

CONTRACTORYES

05]JALGAON KANLDA PHC

Mr.Yogesh N.Jaware

(Junior Engineer)

12.12.2018

NEW LEBOUR

RENOVATION WORK

DISCUSS WITH PLUMBER AND

MEDICAL OFFICERYES

07]BHUSAWAL UPHC BHUSAWAL

Mr.Yogesh N.Jaware

(Junior Engineer)

14.12.2018

WORK IS STOP ,SAND

NOT AVAILBLE

DISCUSSING WITH

CONTRACTORYES

08]JALGAONNEW WORK UPHC

DINDALYL NAGAR

Mr.Yogesh N.Jaware

(Junior Engineer)

18.12.2018

WORK IS STOP ,SAND

NOT AVAILBLE

DISCUSSING WITH

CONTRACTORYES

09]M.NAGARNEW WORK UPHC

DINDALYL NAGAR

Mr.Yogesh N.Jaware

(Junior Engineer)

19.12.2017

AYUSH WORK

PURPOSED

DISCUSSING WITH MEDICAL

OFFICER YES

11]BHUSAWALNEW WORK UPHC

DINDALYL NAGAR

Mr.Yogesh N.Jaware

(Junior Engineer)

28.12.2018

WORK IS STOP ,SAND

NOT AVAILBLE

DISCUSSING WITH

CONTRACTORYES

Bhusawal NUHM BF Meeting Mr,Pravin D Jagtap DCM

(03/12/2018)

All ASHA Programme &

MAASProgramme

Rewise for Cases and

Incentive & ASHA

Payment Balance Follw-

up & All ASHA

Indicator

Facility By Medical Officer NUHM No Facility

Bhusawal

Block Facilatator ASHA

Programme Implimentation

& HBNC Follw-up and

ASHA Payment Balance

Follw-up Meeting

Mr,Pravin D Jagtap DCM

(08/12/2018)

All ASHA Programme

Rewise for Cases and

Incentive & ASHA

Payment Balance Follw-

up & All ASHA

Indicator

Facility By Block Facilatator &

Medical Officer No Facility

Erandol BlockFacilatator Interviews

At Block Level

Mr,Pravin D Jagtap DCM

(12/12/2018)

ASHA Programme

Implimentation To BF

Facility By Block Facilatator &

Medical Officer No Facility

Nasik

ASHA Programme Re-

appropation Meeting

Divisional Level

Mr,Pravin D Jagtap DCM

(29/12/2018)

ASHA Programme

Implimentation

Expenduter Plaining

State Level & Dist Level Officer No Facility

District Jalgaon - Jr.Engineer

District Jalgaon - DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Take a review meeting of

Block Faciletetor and BCM

Review about New

appointment BF wise Non

performing asha. Take

review about bank and

adhar

hbnc tracking and RI

review. Reson of Low

expenditure .

take a review about

software performance

entries and payment balance

in software.

Take a review meeting of

Block Faciletetor and BCM

Review about New

appointment BF wise Non

performing asha. Take

review about bank and

adhar

hbnc tracking and RI

review. Reson of Low

expenditure .

take a review about

software performance

entries and payment balance

in software.

Meeting with mo and all

PHC staff new asha BF.

hbnc tracking and RI

review

Cross check of HBNC from

and asha visit at Field. So

many correction in the form

. No 100% visit

take a review about mmr

imr and discuss about asha

Check list

Meeting with mo and all

PHC staff new asha BF.

hbnc tracking and RI

review

Cross check of HBNC from

and asha visit at Field. So

many correction in the form

. No 100% visit

Dab PHC and Amlibari

SC

Mr.Prasad Sonar 24

.12.2018

Give instruction to asha

BF and LHV for timely

reporting of vpochers

PHC Level Yes NA

Dab PHC and Amlibari

SC

Mr.Prasad Sonar

15 .12.2018

Give instruction to asha

BF and LHV for timely

reporting of vpochers

PHC Level Yes NA

NA

Dhadgan BlockMr Prasad Sonar (DCM)

04.12.2018

Give instruction to asha

BF and BCM. And give

to notice to low

performing bf

District and Block Level Yes NA

District Nandurbar- DCM

Shahada BlockMr Prasad Sonar (DCM)

03.12.2018

Give instruction to asha

BF and BCM. And give

to notice to low

performing bf

District and Block Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

take a review about mmr

imr and discuss about asha

Check list

Meeting with mo and all

PHC staff new asha BF.

hbnc tracking and RI

review

Cross check of HBNC from

and asha visit at Field. So

many correction in the form

. No 100% visit

take a review about mmr

imr and discuss about asha

Check list

Training about HBNC form

feeding. And Diary. No

idea about feeding the

details. And not monitor at

PHC level.

take a review about mmr

imr and discuss about asha

Check list

visit to SC and attend RI

session at village level. And

check HBNC form of asha

and cross veryfy the asha

home visit.

Cross check of HBNC from

and asha visit at Field. So

many correction in the form

Review about New

appointment BF wise Non

performing asha. Take

review about bank and

adhar

Issues about reporting

incnetive not get to asha

from last two month

Attend asha monthlly

meeting at phc

Visit to sc .check asha

performing register pfms

sheet .check hbnc form and

Visit to LB W child home

visit

Cross check of HBNC from

and asha visit at Field. So

many correction in the form

Dekhwad PHCMr.Prasad Sonar

28.12.2018

Give instruction to asha

and BF for regular visit

to Child

PHC Level Yes NA

Lahana shahada PHC Mr.Prasad Sonar

27.12.2018

Give instruction to asha

BF and ANM LHVPHC Level Yes NA

Kathi PHC and Katih

SC

Mr.Prasad Sonar

26.12.2018

Give instruction to asha

BF and LHV for timely

reporting of vpochers

PHC Level Yes NA

Dab PHC and Amlibari

SC

Mr.Prasad Sonar 24

.12.2018

Give instruction to asha

BF and LHV for timely

reporting of vpochers

PHC Level Yes NA

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Review about New

appointment BF wise Non

performing asha. Take

review about bank and

adhar

take a review about mmr

imr and discuss about asha

Check list

visit to SC and attend RI

session at village level. And

check HBNC form of asha

and cross veryfy the asha

home visit.

Training about HBNC form

feeding. And Diary. No

idea about feeding the

details. And not monitor at

PHC level.

take review of RCH portal

entries in software.

Review about New

appointment BF wise Non

performing asha. Take

review about bank and

adhar

Training about BF new

format

Review about Protocol of

Dirriya Numoniya Sepsis.

Review about Doses.

Review of daily visit in

High sensitive block

Kathi PHC

1.RKS

Meeting Isues

2.RKS Expenditure .

3.Sickle Cell Solublity

Testing & MR Campion

Visit

Mr.Umesh Dilip Shinde

D.S./RKS coordinator.

5/12/2018

1.Discuss About Meeting

Of Rks EC,GB

2. Checked To

Expenditure Of RKS

Fund etc

PHC Level Yes NA

Jangthi PHC MR Campaining Visit

Mr.Umesh Dilip Shinde

RKS

coordinator.

6/12/2018

1.Checked Check List Of

Childs 2. Checked

Certificates

PHC Level Yes NA

RH Molgi

1.RKS

Meeting Isues

2.RKS Expenditure .

3.Sickle Cell Solublity

Testing & MR Campion

Visit

Mr.Umesh Dilip Shinde

RKS

coordinator.

7/12/2018

1.Discuss About Meeting

Of Rks EC,GB

2. Checked To

Expenditure Of RKS

Fund etc

RH Level Yes NA

Jangthi PHC MR Campaining Visit

Mr.Umesh Dilip Shinde

RKS

coordinator.

8/12/2018

1.Checked Check List Of

Childs 2. Checked

Certificates

PHC Level Yes NA

District Nandurbar- RKS Co-ordinator

Akkalkuwa Block PHC Mr.Prasad Sonar

29.12.2018

Give instruction to asha

BF and ANM LHVPHC Level Yes NA

Dekhwad PHCMr.Prasad Sonar

28.12.2018

Give instruction to asha

and BF for regular visit

to Child

PHC Level Yes NA

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Jangthi PHC MR Campaining Visit

Mr.Umesh Dilip Shinde

RKS

coordinator.

17/12/2018

1.Checked Check List Of

Childs 2. Checked

Certificates

PHC Level Yes NA

Jangthi PHC

1.RKS

Meeting Isues

2.RKS Expenditure .

3.Sickle Cell Solublity

Testing

4. Discuss VHNSC Bank

Sighneture Change Of

Secretary Asha

Mr.Umesh Dilip Shinde

RKS

coordinator.

27/12/2018

1.Discuss About Meeting

Of Rks EC,GB

2. Checked To

Expenditure Of RKS

Fund etc

4. Discuss VHNSC Bank

Sighneture Change Of

Secretary Asha Worker.

PHC Level Yes NA

PHC Gatadi

Navapur

1) Taking instruction to

complete RCH portal

registration and updation.

2) Take review for HMIS

data entry and instruct to

enter data of all data

element.

3) Check register for JSY

and Delivery .

Shri. Shailesh S. Gavit

M&E Officer Nandurbar

12/12/2018

Instruction to HA and

LHVFacility Level Yes

SDH Navapur

1) Taking instruction to

complete RCH portal

registration and updation.

2) Take instruction about

HMIS Portal data entry.

Shri. Shailesh S. Gavit

M&E Officer Nandurbar

18/12/2018

Instruction to Staff Nurse Facility Level Yes

PHC Ashate

1) Take instruction about

HMIS Portal data entry

2) Check register for JSY

and Delivery

3) Taking instruction to

complete RCH portal

registration and updation.

Shri. Shailesh S. Gavit

M&E Officer Nandurbar

29/12/2018

Instruction to HA and

LHVFacility Level Yes

Navapur Block

1) PMMVY Target

achivement is very low .

2) PMMVY Sukanu

meeting is pending

3 BLOCK fcilator meeting

and target given .

Shri Gangaram Valvi

DPC

05/12/2018

Instruct to THO THO level YES

Dhadgoan Block

1) PMMVY Target

achivement is very low .

2) PMMVY Sukanu

meeting is pending

3 BLOCK fcilator meeting

and target given .

Shri Gangaram Valvi

DPC

11/12/2018

Instruct to THO amd

MOTHO Level YES

Dhadgoan Block

1) PMMVY Target

achivement is very LOW

2) ANM ,BLOCK fcilator to

facilate to for enrolment of

new banificiary.

Shri Gangaram Valvi

DPC

12/12/2018

Instruct to PHC THO Level YES

District Nandurbar- M&E OFFICER

District Nandurbar- RBSK CO.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Shahada Block

1) PMMVY Target

achivement is very low .

2) PMMVY Sukanu

meeting is pending

3)Enrolment of new

banificiary

.

Shri Gangaram Valvi

DPC

13/12/2018

Instruct to THO and

MOTHO and upsc Level YES

Dhadgoan Block

1) PMMVY Target

achivement is very LOW

2) ANM ,BLOCK fcilator to

facilate to for enrolment of

new banificiary.

Shri Gangaram Valvi

DPC

14/12/2018

Instruct to PHC THO Level YES

Nandurbar Block

1) PMMVY Target

achivement is very low .

2) PMMVY Sukanu

meeting is pending

3)Enrolment of new

banificiary and 2nd and 3rd

due pendancy

.

Shri Gangaram Valvi

DPC

15/12/2018

Instruct to THO THO Level YES

Taloda bolck

1) Ashaa wise targrt and

achivement .

2) PMMVY Sukanu

meeting is pending

3)Enrolment of new

banificiary and 2nd and 3rd

due pendancy

.

Shri Gangaram Valvi

DPC

27/12/2018

Instruct to THO and

MOTHO and PHC Level YES

Akkalkuwa Block

1) Ashaa wise targrt and

achivement .

2) PMMVY Sukanu

meeting is pending

3)Enrolment of new

banificiary and 2nd and 3rd

due pendancy

.

Shri Gangaram Valvi

DPC

28/12/2018

Instruct to THO and

MOTHO and PHC Level YES

Taloda bolck

1) Ashaa wise targrt and

achivement .

2) Correction queues to be

correct. 3)Enrolment of new

banificiary and 2nd and 3rd

due pendancy

.

Shri Gangaram Valvi

DPC

29/12/2018

Instruct to THO THO and PHC Level YES

Shahada Block

1) Ashaa wise targrt and

achivement .

2) Correction queues to be

correct. 3)Enrolment of new

banificiary and 2nd and 3rd

due pendancy

.

Shri Gangaram Valvi

DPC

30/12/2018

Instruct to THO and

MOTHO and PHC Level YES

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Kathi phc ilr/df unit Not working

Mr. Gitesh R. Gavit Cold

Chain Technician.

05/12/2018

ILR Machine Repairing /

both machine servising

and cheking

Facility yes

B.A. Vihir PHC ILR Unit not work

Mr. Gitesh R. Gavit Cold

Chain Technician.

15/12/2018

there ILR

subzirocontroler

defective so new old

repaier ILR Instlation /

both machine servising

and cheking

Facility yes

Kakarda PHC Visit

Mr. Gitesh R. Gavit Cold

Chain Technician.

17/12/2018

both machine servising

and chekingFacility yes

Mandavi PHC Visit

Mr. Gitesh R. Gavit Cold

Chain Technician.

20/12/2028

both machine servising

and chekingFacility yes

Dab PHC Visit

Mr. Gitesh R. Gavit Cold

Chain Technician.

21/12/2018

both machine servising

and chekingFacility yes

RH Akkalkuwa Visit

Mr. Gitesh R. Gavit Cold

Chain Technician.

25/12/2018

both machine servising

and chekingPHC Facility yes

lahan shahada Tempreture show -1`c

Mr. Gitesh R. Gavit Cold

Chain Technician.

31/12/2018

ILR repairing and both

machine servising and

cheking

PHC Facility yes

RH Akkaklkuwa, PHC

Ohwa, Vadafali Tal.

Akkalkuwa

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

3)to Prepair Estimate For

Labour Room PHCs

Mr. Mayur K. Deore

Deputy Engineer

14.12.2018

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

3)to Prepair Estimate For

Labour Room PHCs

UPHC Shahada

1) to checkUPHC Shahada

Finishing Work In

Progress.

2) for Review of work in

Complete.

Mr. Mayur K. Deore

Deputy Engineer

17.12.2018

1) to checkUPHC

Shahada Finishing Work

In Progress.

2) for Review of work in

Complete.

RH Akkaklkuwa

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

Mr. Mayur K. Deore

Deputy Engineer

19.12.2019

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

RH Akkaklkuwa

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

03.12.2018

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

PHC Chinchapada,

Dodegaon, Gatadi,

Zamanzar tal. Navapur

1) to Prepair Estimate For

Labour Room PHCs

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

06.12.2018

1) to Prepair Estimate

For Labour Room PHCs

2) for Review of work in

Complete.

District Nandurbar- Cold Chain Technician

District Nandurbar- Dy.Engineer

District Nandurbar- Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Akkaklkuwa, PHC

Ohwa, Vadafali Tal.

Akkalkuwa

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

3)to Prepair Estimate For

Labour Room PHCs

Mr. Bushan D. Gangurde

Junior Engineer

14.12.2018

1) to check SNCU RH

Akkalkuwa Eletrification

Work In Progress.

2) for Review of work in

Complete.

3)to Prepair Estimate For

Labour Room PHCs

UPHC Shahada

1) to checkUPHC Shahada

Finishing Work In

Progress.

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

17.12.2019

1) to checkUPHC

Shahada Finishing Work

In Progress.

2) for Review of work in

Complete.

PHC Wavadi, Umran,

Pratappur Tal Navapur

1) to Prepair Estimate For

Labour Room PHCs

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

20.12.2020

1) to Prepair Estimate

For Labour Room PHCs

2) for Review of work in

Complete.

PHC Mandavai and Son

Tal. Dhadgaon

1) to Prepair Estimate For

HWC PHCs

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

24.12.2021

1) to Prepair Estimate

For HWC PHCs

2) for Review of work in

Complete.

PHC Ahste, Dhekwad,

Rakasawada

1) to Prepair Estimate For

HWC PHCs

2) for Review of work in

Complete.

Mr. Bushan D. Gangurde

Junior Engineer

27.12.2022

1) to Prepair Estimate

For HWC PHCs

2) for Review of work in

Complete.

PHC Mehakari,

Tal.Nagar, Dist.A.Nagar.

1.The drugs The drugs

stored properly in Pharmacy

but were not labelled.

2.PPH Protocol found to be

displayed in labor room,

drum

ready to attend patient in

labor. 3.Financial record

checking of

Sub Center & Primary

Health Center.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

01/12/2018

Instruct all staff to use

the RCH Portal

workplans for increasing

Delivery & Other

services.

Instruct All staff to

Maintan the Physical &

financial records

peroperly.

District, Block, PHC & SC Level Yes

SC Supa, PHC

Ruichhattrapati,

Tal.Parner, Dist.A.Nagar.

1. Delivery, immunisation,

ILR temperature, JSY, OPD

& IPD register updated.

2. Medicine stock book

updated & 3. IEC material

sufficiently present all over

PHC.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

03/12/2018

Instruct MO & All Staff

for updating all register

updated record.

District, Block, PHC & SC Level Yes

District Ahmednagar- DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Nimgaonjali, PHC

Dhandarfal, PHC

Chandanapuri, PHC

Gharagaon, PHC Bota,

THO Office Sangamner,

Tal.Sangamner,

Dist.A.Nagar.

1. Sathrog Visit &

discussion for the sathrog

reports.

2.Visit for the Yatra for

Walwane. 3. PHC & SC

were in Cleane condition.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

05/12/2018

Instruct MO & All Staff

for PHC & SC Facility

clearing place. Instruct

Pharmacy Officer to lable

all drugs properly,

Maintain Daily stock

registar & Expiry

register.

District, Block, PHC & SC Level Yes

SC Uakkadgaon, PHC

Takali Kazi, Tal.Nagar,

Dist.A.Nagar.

RCH Portal Entry &

Aadhaar No., Bank Details,

HMIS Portal reports Check

& RCH, Fmaily Planing

Records Check &

Discussion.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

13/12/2018

Instruct MO & All Staff

for updating RCH Portal

entry. Instruct MO &

other staff to collect SC

HMIS Portal formats at

PHC Level.

District, Block, PHC & SC Level Yes

THO Office Parner,

Tal.Parner, Dist.A.Nagar.

1.RCH Reg. , Delivary and

Regester Chacked .

2.PHC were in Cleane

condition. 3.RCH Portal

Entryes were not done in

RCH Regester.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

27/12/2018

Instruct All staff to

Maintan the Physical &

financial records

peroperly.

District, Block, PHC & SC Level Yes

PHC Astagaon, PHC

Savalivihir, Tal.Rahata,

THO Office Kopargaon,

Tal.Kopargaon,

Dist.A.Nagar.

RCH Portal Entry &

Aadhaar No., Bank Details,

HMIS Portal reports Check

& RCH, Fmaily Planing

Records Check &

Discussion.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

29/12/2018

Instruct MO & All Staff

for updating RCH Portal

entry. Instruct MO &

other staff to collect SC

HMIS Portal formats at

PHC Level.

District, Block, PHC & SC Level Yes

Tho Office Shrirampur,

Tal.Shrirampur,

Dist.A.Nagar.

1.The drugs The drugs

stored properly in Pharmacy

but were not labelled.

2.PPH Protocol found to be

displayed in labor room,

drum

ready to attend patient in

labor. 3.Financial record

checking of

Sub Center & Primary

Health Center.

Dr. S.N.Sangale, DHO

Ahmednagar, Date

30/12/2018

Instruct all staff to use

the RCH Portal

workplans for increasing

Delivery & Other

services.

Instruct All staff to

Maintan the Physical &

financial records

peroperly.

District, Block, PHC & SC Level Yes

PHC- Devgaon

Equipment maintanance &

repair record not

maintain.All Colour coded

buckets & liners not

available as per BMW Act

2016.

DPM,Dr. Amol shinde

12-12-2018yes Facility level

District Ahmednagar- DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC- Kolgaon

All Colour coded buckets

& liners not available as per

BMW Act 2016.Monthly

Quality Audit

(PSS,Medical,Priscription),

Annexure A report,Monthly

Quality Team ,Infection

Control & Cleanliness

Committee meeting record

not found.

Dr. Amol shinde

21-12-2018

All Colour coded

buckets & liners should

be available as per

BMW Act 2016.

Monthly Quality Audit

(PSS,Medical,Priscriptio

n),Annexure A

report,Monthly Quality

Team ,Infection Control

& Cleanliness Committee

meeting should conduct

regularly & maintain

record..

Facility level

Rh Parner

All Colour coded buckets

& liners not available as

per BMW Act 2016. ODF

Block gap closure action

plan not prepared

Dr. Shinde Rahul ,(QA Co.)

date:-11 /12/2018

All Colour coded

buckets & liners should

be available as per

BMW Act 2016. Action

plan for ODF block gap

closure should prepare

on priority basis as per

guideline.

Facility Level / District level noFacility Level /

District level

PHC Kolgaon

All Colour coded buckets

& liners not available as per

BMW Act 2016.Monthly

Quality Audit

(PSS,Medical,Priscription),

Annexure A report,Monthly

Quality Team ,Infection

Control & Cleanliness

Committee meeting record

not found.

Dr. Shinde Rahul ,(QA Co.)

date:- 21/12/2018

All Colour coded

buckets & liners should

be available as per

BMW Act 2016.

Monthly Quality Audit

(PSS,Medical,Priscriptio

n),Annexure A

report,Monthly Quality

Team ,Infection Control

& Cleanliness Committee

meeting should conduct

regularly & maintain

record..

Facility Level/District Level no

Facility

Level/District

Level

PHC Nighoj

All Colour coded buckets

& liners not available as per

BMW Act 2016.Monthly

Quality Audit

(PSS,Medical,Priscription),

Annexure A report,Monthly

Quality Team ,Infection

Control & Cleanliness

Committee meeting record

not found.

Dr. Shinde Rahul ,(QA Co.)

date:- 29/12/2018

All Colour coded

buckets & liners should

be available as per

BMW Act 2016.

Monthly Quality Audit

(PSS,Medical,Priscriptio

n),Annexure A

report,Monthly Quality

Team ,Infection Control

& Cleanliness Committee

meeting should conduct

regularly & maintain

record..

Facility Level noFacility Level /

District level

PHC Takali Khatgaon RKS,AMG,UF

Miss.Lanke Shilpa -RKS

Co-ordinater

date - 11/12/2018

Give Instruction to

MO,THOMO,THO Yes NO

RH Sangamner RKS,AMG,UF

Miss.Lanke Shilpa -RKS

Co-ordinater

date - 21/12/2018

Give Instruction to

MS,AS, ClerkMS Yes NO

PHC Chandanapuri RKS,AMG,UF

Miss.Lanke Shilpa -RKS

Co-ordinater

date - 22/12/2018

Give Instruction to

MO,THOMO,THO Yes NO

PHC Takli kazi RKS,AMG,UF

Miss.Lanke Shilpa -RKS

Co-ordinater

date - 26/12/2018

Give Instruction to

MO,THOMO,THO Yes NO

District Ahmednagar- QA Co-ordinator

District Ahmednagar- RKS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHc Takali khatgaon MR Supervision

Mrs. Nagargoje K.s.

11/12/ 2018

IPHS CO.

Should be update 6D format Facility level YES

PHc 1) Devlali pravra,2)

Marathi school, 3) school

global wisidom.

MR Supervision

Mrs. Nagargoje K.s.

13/12/ 2018

IPHS CO.

Should be update 6D format Facility level YES

PHC 1) Belapur ,2)

Belapur khurd,MR Supervision

Mrs. Nagargoje K.s.

13/12/ 2018

IPHS CO.

Should be update 6D format Facility level YES

Zp school

undewasti,Matapur,

Anganwadi

MR Supervision

Mrs. Nagargoje K.s.

13/12/ 2018

IPHS CO.

Should be update master file Facility level YES

PHc Takali khatgaon MR Supervision

Mrs. Nagargoje K.s.

25/12/ 2018

IPHS CO.

Should be update master file Facility level YES

Wadgaon Gupta,

P.s.Nagar

SC visit & check, NRHM,

RCH, RNTCP Record

checking, Aganwadi check,

primry School ,aganwadi,

MR Supervision, BTF /Core

committee Meeting

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 01/12/2018

Instrcuctions given. - YES

Burhanagar, Nagardevale,

P.S.Nagar

MR Supervision SC visit &

Aganwadcheck, NRHM,

RCH, RNTCP Record

checking, Aganwadi check

RBSK Meeting,

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 03/12/2018

Instrcuctions taken. - YES

Takali khatgaon,

Kharekarjune

MR SupervisionPHC SC

visit & Aganwadcheck,

NRHM, RCH, RNTCP

Record checking,

Aganwadi check RBSK

Meeting,

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 05/12/2018

Instrcuctions given. - YES

Burhanagar, Nagardevale,

P.S.Nagar

MR SupervisionPHC SC

visit & Aganwadi & School

supervisioncheck, NRHM,

RCH, Aganwadi sevika

meeting,Private doctor

BNH Supervision

inspection

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 06/12/2018

Instrcuctions given. - YES

walunj

MR Supervision PHC Visit

& SC Visit NRHM, RCH,

RNTCP record Check,

Nalanda English School, ZP

School

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 7/12/2018

Instrcuctions given. - YES

Navnagapur

MR Supervision PHC Visit

& SC Visit, Swami

Vivekanand Primary,

Secondary School

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 10/12/2018

Instrcuctions given. - YES

District Ahmednagar- IPHS Co-ordinator

District Ahmednagar- THO Nagar

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Jeur

MR Supervision PHC Visit

& SC Visit NRHM,

RCH, RNTCP record

Check, Yashashree school,

Aganwadi check

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 11/12/2018

Instrcuctions taken. - YES

Nagardevale

MR Supervision SC visit &

check, NRHM, RCH,

RNTCP Record checking,

Aganwadi

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 12/12/2018

Instrcuctions given. - YES

Darewadi, narayan doh

MR Supervision SC visit &

check,St.michael School

MR Supervision

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 13/12/2018

Instrcuctions taken. - YES

takali kazi

MR Supervision SC visit &

check, MR Supervision

Aganwadi visit

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 14/12/2018

Instrcuctions given. - YES

Dehare

MR Supervision PHC SC

visit & check, MR

Supervision Mobile team

visit

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 15/12/2018

Instrcuctions given. -

NimblakMR Supervision SC visit &

check, MR Supervision visit

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 17/12/2018

Instrcuctions given. - YES

Mehekari, BarababhaliMR SupervisionPHC SC

visit & Aganwadi & School

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 18/12/2018

Instrcuctions given. - YES

Chas

MR Supervision PHC visit

& Aganwadcheck, NRHM,

RCH, RNTCP Record

checking,

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 26/12/2018

Instrcuctions given. - YES

Nimblak

MR Supervision SC visit &

Aganwadcheck, NRHM,

RCH, RNTCP Record

checking,

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 27/12/2018

Instrcuctions given. - YES

DongarganMR Supervision SC visit &

NRHM, RCH, check

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 28/12/2018

Instrcuctions given. - YES

PS NagarMO, LHV, HA, Clerk

Meeting

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 29/12/2018

Instrcuctions given. - YES

Dehare

MR Supervision PHC visit

& Aganwadcheck, NRHM,

RCH, RNTCP Record

checking,

Dr. J.S. Mandge THO

Nagar Dist. Ahmednagar,

Date 31/12/2018

Instrcuctions given. - YES

District Ahmednagar- THO Parner

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Kanoli, PHC Ashwi,

Tal.Sangamner, SC

Kajuleharya, PHC

Khadakwadi, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI & MR

Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

01/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Supa, PHC

Ruichhattrapati,

Tal.Parner, SC Darewadi,

PHC Takali Kazi,

Tal.Nagar, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

Delivery very low.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

03/12/2018

Colour coded buket tobe

kept.

Delivery to be improved.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO ANMYes

Yes

PHC Devlali Pravara,

Tal.Rahuri, PHC

Padhegaon, THO Office

Shrirampur,

Tal.Shrirampur,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

05/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Narayangavhan, SC

Kadus, PHC Palawe Kh.,

Tal.Parner, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

Delivery very low.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

06/12/2018

Colour coded buket tobe

kept.

Delivery to be improved.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO ANMYes

Yes

THO Office Parner,

Tal.Parner, THO Office

Shrigonda, Tal.Shrigonda,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

07/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Jawala, SC

Devibhoyare, PHC Nighoj,

SC Padalidrya, PHC

Alkuti, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

08/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Kajuleharya, PHC

Khadakwadi, PHC

Bhalwani, PHC

Kanhoorpathar,

Tal.Parner, Dist.A.Nagar.

Cleaning outside not done.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

11/12/2018

Cleaning should be done.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

ANM ANMYes

Yes

SC Supa, PHC

Ruichhattrapati, PHC

Palawe, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

12/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Uakkadgaon, PHC

Takalikazi, PHC Chas,

Tal.Nagar, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

13/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Alkuti, PHC Nighoj,

Tal.Parner, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

Delivery very low.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

14/12/2018

Colour coded buket tobe

kept.

Delivery to be improved.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO ANMYes

Yes

SC Jamgaon, PHC

Bhalwani, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

18/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Jawala, SC

Ralegantherpal, SC

Kurund, PHC Nighoj, SC

Lonimavala, PHC Alkuti,

PHC Palawe, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

Delivery very low.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

21/12/2018

Colour coded buket tobe

kept.

Delivery to be improved.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO ANMYes

Yes

SC Wadner, PHC Nighoj,

Tal.Parner, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

22/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

SC Pokhari, SC Palaspur,

PHC Khadakwadi, PHC

Bhalwani, Tal.Parner,

Dist.A.Nagar.

Bio-Medical guidelines not

followed.

Delivery very low.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details.

Dr. P. S. Lalge THO Parner

& DRCHO Date

29/12/2018

Colour coded buket tobe

kept.

Delivery to be improved.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO ANMYes

Yes

SC Ralegantherpal, PHC

Nighoj, PHC Palwe,

Tal.Parner, PHC Chas,

Tal.Nagar, Dist.A.Nagar.

Bio-Medical guidelines not

followed.

RCH Portal data entry not

done at Aadhaar No. &

Bank Details. RI Sessions.

Dr. P. S. Lalge THO Parner

& DRCHO Date

31/12/2018

Colour coded buket tobe

kept.

RCH Portal data entry

not done at Aadhaar No.

& Bank Details.

MO Level MO LevelYes

No

MO Level

HFWTC Pune - Aundh

Pune

Audit Compliance of Pune

District .

Mr.Ganesh Jagtap CPM Dt -

12/12/2018NO DD Level NO No

HFWTC Pune - Aundh

Pune

Audit Compliance of Satara

District .

Mr.Ganesh Jagtap CPM Dt -

13/12/2018NO DD Level NO No

HFWTC Pune - Aundh

Pune

Audit Compliance of

Solapur District .

Mr.Ganesh Jagtap CPM Dt -

14/12/2018NO DD Level NO No

HFWTC Pune

Traning of NUHM baches (

bach -1)

1) HMIS Portal , RCH

Portal, DHIS-2 Softwear

Mr. Dhanaji Kaulge Pune,

M & E officer Dt -

11/12/2018

NO DD Level NO No

Circle Pune - CPM

Circle Pune - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

HFWTC Pune

Traning of NUHM baches (

bach -2)

1) HMIS Portal , RCH

Portal, DHIS-2 Softwear

Mr. Dhanaji Kaulge Pune,

M & E officer Dt -

12/12/2018

NO DD Level NO No

Panchyat samitte Bhor1Low performanc ein RCH

Portal & JSY

M&E,Mrs.Kejkar R.G 5-12-

2018

Instructions are given to

THOAt Block Level

PHC Neree1Low performanc ein RCH

Portal & JSYMrs.Kejkar R.G 5-12-2018

Instructions are given to

LHV & MO

Instructions are given to LHV &

MO

Panchyat Samitte Velha Reporting IssueMrs.Kejkar R.G 21-12-

2018

Instructions are given to

THOAt Block Level

PHC Karanjvane1Low performanc ein RCH

Portal & JSY

Mrs.Kejkar R.G 21-12-

2018

Instructions are given to

LHV & MO

Instructions are given to LHV &

MO

Village Antroli MMU 1.About Low performance

in ANC & PNC

Mrs.Kejkar R.G 21-12-

2018

Instructions are given to

M.O

PHC Wathar ki , SC

Triputi

1)Free diet & Jssk Pol

Vouchers are not

completely & vehicle Log

book not completed.2) SC

leval Fund not

transferred.3) Ledger book

uncompleted 4) less

cleanliness at SC area

internal as well as out side

SC

Dr. Dilip Mane DHO Z

P Satara Dt. 12-12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Umbraj, PHC Kale

,SC Khodashi

Meeting Register

Uncompleted,Meeting

Notice Register

Uncompleted,Jsy Cash

Book Uncompleted

Dr. Dilip Mane DHO Z

P Satara Dt.10-12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Tadawale THO

Koregaon

1)MCTS & DHIS data entry

status cheking 2) JSY exp.

Reveve sc wise & other

head exp -3) FP Cases

discussion

Dr. Dilip Mane DHO Z

P Satara Dt. 14-12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Morgiri, SC

Mandure

Less Cleanliness internal as

well as Out side PHC area,

Cleaning time table not

perfectly followed , Review

taken of all program

Dr. Dilip Mane DHO Z

P Satara Dt. 23-12-2018

Instruction given releted

to issues identifiedPHC level No No

District Pune - M&E OFFICER

District Satara - DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Koregaon PHC

Wathar ki

Less cleanliness at PHC and

SC inside and Out side PHC

Area, Cleaning time table

not followed O HBV not

given to all deliveries , ILR

Tempreture not written,

Email register not

maintained at THO office ,

Dr. Sachin Patil Dt. 06-

12-2018

Instruction given releted

to issues identifiedPHC level No No

THO Satara , PHC

Kanher , SC Kondave

R14 R17,R17 register not

completed and faultily

recorded , HRA and RI drop

out found , Email register

not maintanined , Review of

all program , Open vial

policy used

Dr. Sachin Patil Dt. 12-

12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Umbraj, SC

Khodashi THO Karad

Review of RHC,

Immunization, DHIS 2

Error , MCTS training taken

in Block meeting in the

presence of DHO and

DRCHO, THO Dr. Sachin Patil Dt. 14-

12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Salave, PHC Kale

THO Patan

Less cleanliness at PHC and

SC inside and Out side PHC

Area, Cleaning time table

not followed O HBV not

given to all deliveries , ILR

Tempreture not written,

Email register not

maintained at THO office ,

Dr. Sachin Patil Dt. 17-

12-2018

Instruction given releted

to issues identifiedPHC level No No

THO Phaltan ,SDH

Phaltan

THO Office Record

maintain well, PalKhi

Niyogan Meeting attend.

Dr. V.V. Patil DPM Dt 12-

12-2018

Instruction given releted

to issues identified - No

PHC Kanher,

Rcord keeping well,

Delivery in PHC Building

not Satishfactory, less data

entry in RCH Software,

PHC area keep clean

Dr. V.V. Patil DPM Dt 06-

12-2018

Instruction given releted

to issues identified - No

PHC Nagthne

Rcord keeping good ,

Delivery in PHC Building

Satishfactory, PHC area

keep clean, Improvement

under Kayakalp

Dr. V.V. Patil DPM Dt 16-

12-2018

Instruction given releted

to issues identified - No

District Satara -

District Satara - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Patan

Rcord keeping Well ,

Delivery in RH Building

Satishfactory, RH Building

area keep clean,

Dr. V.V. Patil DPM Dt 21-

12-2018

Instruction given releted

to issues identified - No

PHC Limb

Rcord keeping good ,

Delivery in PHC Building

Satishfactory, PHC area

keep clean, Improvement

under Kayakalp

Dr. V.V. Patil DPM Dt 29-

12-2018

Instruction given releted

to issues identified - No

THO Patan , PHC Keral

1) Record Varification done

2) AG Audit para guidline

information given 3)

Familiy planning Grant

problem solved

Mr. Vijay Gaikwad DAM

03-12-2018Instruciton Given Block leavel - -

PHC Pachgani

AG Audit and Dive comm

Audit . Fund Trnasfer , BRS

record, Expenditure, and

other document checkedMr. V B Gaikwad DAM

Dt.:- 10-12-2018NO -- NO

THO Satara PHC

Nagthane

Fund Trnasfer , BRS record,

Expenditure, and other

document checkedMr. V B Gaikwad DAM

Dt.:-22-12-2018NO -- NO

Anewadi SC

Visited SC for ACS

Madam visit .All Record

verified

Mr. Anandrao Kumbhar

S O Z P Satara Dt

12-12-2018

DHIS2 & MCTS

information.PHC Saigaon Yes --

Karad MCL/BDO

Births & Deaths record

verified

Mr. Anandrao Kumbhar

S O Z P Satara Dt

07-12-2018

All Births&Deaths 2018

verified from registers. MCL/BDO Karad Yes --

Wai MCL/BDO

Births & Deaths record

verified

Mr. Anandrao Kumbhar

S O Z P Satara Dt

17-12-2018

All Births&Deaths 2018

verified from registers. MCL/BDO Wai Yes --

Kole PHC & Chachegaon

SC

SCD Record verified &

omissions found out by

house to house survey.

Mr. Anandrao Kumbhar

S O Z P Satara Dt

23-12-2018

4 omissions of resident

births found,included in

Sep.17 SCD Report. MO PHC Kole Yes --

Salve PHC &Mahind SC

SCD Record verified &

omissions found out by

house to house survey.

Mr. Anandrao Kumbhar

S O Z P Satara Dt

24-12-2018

3 omissions of resident

births found,included in

Sep.17 SCD Report. MO PHC Salve Yes --

Tarale PHC & Vajroshi

SC

SCD Record verified &

omissions found out by

house to house survey.

Mr. Anandrao Kumbhar

S O Z P Satara Dt

31-12-2018

4 omissions of resident

births & 2 deaths

found,included in Sep.17

SCD Report.

MO PHC Tarale Yes --

1)No. of non performing

asha was zero

Given Instruction to

concern bf and bcmPhc level no

2) Software entry was in

progess for month Aug

2018

Given Instruction to

concern bf and bcmPhc level no

District Satara - DAM

District Satara - SO

District Satara - DCM

phc BavdhanDCM KARAN JAGTAP

03/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

3) remaining compensation

software entry

Given Instruction to

concern Bf and BCMPhc level no

Commissionor office,pune NHM Audit Report DCM KARAN JAGTAP

12/12/2018

Not chacked by Dy

Commissionor,

(Tapasani),Pune

1)Zero performance in

PPIUD activity.

Given Instruction to

concern Tho and BCMTho level no

2) There are 24 asha

performed as like as poor

performance.

Given Instruction to

concern Tho and BCMTho level no

3)Asha Induction training

batch was not conducted till

date.

Given Instruction to

concern Tho and BCMTho level no

1)Poor performance under

follow up of LBW babies by

Asha

Given Instruction to

concern Bf and BCMPhc level no

2)Not found some letters

given by district office

Given Instruction to

concern Bf and BCMPhc level no

3) Near about Rs 45000 /-

pending incentives of asha

under JSY up to Aug 2018

Given Instruction to

concern Bf and BCM

and issued letter to

Medical Officer

Phc level no

Commissionor office,pune NHM Audit Report DCM KARAN JAGTAP

17/12/2018

Find some currections in

Audit report no

THO Koregaon PHC

Wathar ki

Less cleanliness at PHC and

SC inside and Out side PHC

Area, Cleaning time table

not followed O HBV not

given to all deliveries , ILR

Tempreture not written,

Email register not

maintained at THO office ,

Smt Anamika P Ghadage M

& E offficer Z P Satara

Dt. 04-12-2018

Instruction given releted

to issues identifiedPHC level No No

THO Satara , PHC

Kanher , SC Kondave

R14 R17,R17 register not

completed and faultily

recorded , HRA and RI drop

out found , Email register

not maintanined , Review of

all program , Open vial

policy used

Smt Anamika P Ghadage M

& E offficer Z P Satara

Dt. 6-12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Umbraj, SC

Khodashi THO Karad

Review of RHC,

Immunization, DHIS 2

Error , MCTS training taken

in Block meeting in the

presence of DHO and

DRCHO, THO

Smt Anamika P Ghadage M

& E offficer Z P Satara

Dt. 14-12-2018

Instruction given releted

to issues identifiedPHC level No No

Tho WaiDCM KARAN JAGTAP

4/12/2018

Phc Chinchner vandanDCM KARAN JAGTAP

06/12/2018

District Satara - M&E OFFICER

phc BavdhanDCM KARAN JAGTAP

03/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Salave, PHC Kale

THO Patan

Less cleanliness at PHC and

SC inside and Out side PHC

Area, Cleaning time table

not followed O HBV not

given to all deliveries , ILR

Tempreture not written,

Email register not

maintained at THO office ,

Smt Anamika P Ghadage M

& E offficer Z P Satara

Dt.17-12-2018

Instruction given releted

to issues identifiedPHC level No No

PHC Kavathe

,Cash Book Uncompleted,

Bank Reconcilation

Uncompleted,Cash Book

Uncompleted

Dr.Sandip M Yadav THO

WAI 12/12/2018

3) Showcause Letter

issue by to MOPHC Level Yes -

Sc- Panchwad

Meeting Notice Book

uncompleted JSY Register

Uncompleted,Jsy Card

Uncompleted,Untied Cash

Book Uncompleted,Meeting

Register Uncompleted

Dr.Sandip M Yadav THO

WAI 07/12/2018

3) Showcause Letter

issue by to ANMSc & Phc Level Yes -

Sc- Khavali No IssuesDr.Sandip M Yadav THO

WAI 10/12/2018NA NA No -

Sc- Jamb

JSY Cash Book

Uncompleted, Bank Pass

Book Uncompleted,Untied

& ANG Cash Book

Uncompleted

Dr.Sandip M Yadav THO

WAI 12/12/2018

3) Showcause Letter

issue by to ANMSc & Phc Level Yes -

Sc- Vele

Meeting Register ,JSY Cash

Book Uncompleted, Bank

Pass Book

Uncompleted,Jsy Card

Uncompleted

Dr.Sandip M Yadav THO

WAI 13/12/2018

3) Showcause Letter

issue by to ANMSc & Phc Level Yes -

PHC - Bhuinj

FMR Uncompleted,Cash

Book Uncompleted, Bank

Reconcilation

Uncompleted,Cash Book

Uncompleted

Dr.Sandip M Yadav THO

WAI 2018/12/2018

3) Showcause Letter

issue by to MOPHC Level Yes -

Sc-Kikali

Jsy Card

Uncompleted,Untied Cash

Book Uncompleted,Meeting

Register Uncompleted

Dr.Sandip M Yadav THO

WAI 20/12/2018

3) Showcause Letter

issue by to ANMSc & Phc Level Yes -

Sc- Chandak No IssuesDr.Sandip M Yadav THO

WAI 21/12/2018NA NA No -

District Satara - THO WAI

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC - Malatpur No IssuesDr.Sandip M Yadav THO

WAI 31/12/2018NA NA No -

PHC - Bavdhan

FMR Uncompleted,Cash

Book Uncompleted, Bank

Reconcilation

Uncompleted,Cash Book

Uncompleted,Ledger

uncompleted,Meeting

Register uncompleted

Ganesh B Yadav Tho

Accountant

14/12/2018

3) Showcause Letter

issue by to MOPHC Level Yes -

PHC - Bhuinj No Issues

Ganesh B Yadav Tho

Accountant

17/12/2018

NA PHC Level NO -

PHC - Kavathe

FMR Uncompleted,Cash

Book Uncompleted, Bank

Reconcilation

Uncompleted,Cash Book

Uncompleted,Ledger

uncompleted,Meeting

Register uncompleted

Ganesh B Yadav Tho

Accountant

20/12/2018

3) Showcause Letter

issue by to MOPHC Level Yes -

PHC Malatpur

FMR Uncompleted,Cash

Book Uncompleted, Bank

Reconcilation

Uncompleted,Cash Book

Uncompleted,Ledger

uncompleted,Meeting

Register uncompleted

Ganesh B Yadav Tho

Accountant

21/12/2018

3) Showcause Letter

issue by to MOPHC Level Yes -

PHC Bibi

Nrhm cash Book Update

upto Sept 17. Rks meeting

Not Done in this monts Jsy

Physical Target is Not

achieved praportionately,

MR.DR V V Pote (Tho

Phaltan) 10.12.2018

As per instrructions

given by us in visit

AT Block Level Letter Given to

InstituteYes

PHC Barad

Nrhm cash Book Update

upto Sept 17. Jsy & Fp

Physical Target is Not

achieved praportionately,

21.12.2018As per instrructions

given by us in visit

AT Block Level Letter Given to

InstituteYes

PHC Taradgoan

Nrhm cash Book Update

upto Sept 17. Jsy Physical

Target is Not achieved

praportionately,

MR.Rajendra

Nanaware(Block

Accountant Phaltan

)13.12.2018

As per instrructions

given by us in visit

AT Block Level Letter Given to

InstituteYes

District Satara - Accountant

District Satara - THO Phaltan

District Satara - Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Sakharwadi

Nrhm cash Book Update

upto Sept 2018 Bur Brs

was worng free diet

Expenditure Not Done in

April to Dec 2018

27.12.2018As per instrructions

given by us in visit

AT Block Level Letter Given to

InstituteYes

PHC Barad

Nrhm cash Book Update

upto Sept 17. Jsy Physical

Target is Not achieved

praportionately,

29.12.2018As per instrructions

given by us in visit

AT Block Level Letter Given to

InstituteYes

Lake of co-ordination

between PHC level

supervisiory staff

DHIS 2 Errors are not

corrected within time

No use of Bio Metric

Attendance Machine by

PHC Staff

Lake of co-ordination

between PHC level

supervisiory staff

Male HA Record not

available for Verification

and LHV Registers and not

updated

MCTS Due services of

ANC & Child record not

maintain

subcentre primises was not

clean

SC Delivery proportion is

very low

Financial Record iwas

Incomplete

Lake of co-ordination

between MO & Clerk

ANC registration not

achieved in proportion

SC Premises is not properly

cleaned and maintained

FP Target is not achieved in

proportion

ANM Record was not

updated

MPW Record wass

incomplete

All Physical Targets viz FP,

ANC Registration, RI are

not achieved in proportion

SCKhedDr.R.T. Jadhav (THO)

23/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

PHC TadawaleDr.R.T. Jadhav (THO)

21/12/2018SC And PHC Level Yes

PHC KinhaiDr.R.T. Jadhav

(THO)17/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

SC BichukaleDr.R.T. Jadhav (THO)

15/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

PHC PalashiDr.R.T. Jadhav (THO)

10/12/2018

Oral Instruction Given to

Supervisiory staffPHC Level Yes

District Satara - THO

Phc Wathar StationDr.R.T. Jadhav (THO)

07/12/2018

Oral Instruction Given to

Supervisiory staffPHC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Premises and area is not

clean and maintained

properly

FP Target is not achieved in

proportion

Financial record not

maintained properly.

ANM not residing at

subcenter

No NRHM Record found at

subcentre

ANM not residing at

subcenter SC Delivery

proportion is very low

MCTS Due services of

ANC & Child record not

maintain

Line Listing of Death

Feeded in DHIS 2 not done

RI Card of ANC & Children

are incomplete

ANM not residing at

subcenter, so Delivery at

SC building not done

All Physical Targets viz FP,

ANC Registration so and

MCTS Data Entry, RI are

not achieved in proportion

SC Premises is not clean

and maintained

PHC _Wathar StationStock Register Entries are

incompleteMS T.S.Shaikh 06/12/2018

Instructions given for

corrective actions and

BRS done

PHC Level Yes

RKS EC GB Meeting are

not taken quarterly as per

norms

Yes

Cash Book Incomplete NO

Vouchers not available for

verificationYes

Stock Register Entries are

incomplete

Ledger & Advance Register

not Maintained Manuarlly

BRS not Prepare Montlhy

PHC _Wathar KiroliNo Record Found for

VerificationMS T.S.Shaikh 20/12/2018 Letter Issued PHC Level Yes

PHC _Kinahai MS T.S.Shaikh 10/12/2018

Instructions given for

corrective actions to

complete record RKS

audit

PHC Level

PHC _Palashi MS T.S.Shaikh 12/12/2018

Instructions given for

corrective actions to

complete record before

IV quarter Audit

PHC Level Yes

District Satara - Accountant

SC NigadiDr.R.T. Jadhav (THO)

31/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

SC BhoseDr.R.T. Jadhav (THO)

29/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

SC EkambeDr.R.T. Jadhav (THO)

27/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

SC ChimangaonDr.R.T. Jadhav

(THO)24/12/2018

Instructions issued for

corrective actionsSC And PHC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC_ RahimatpurNo Record Found for

VerificationMS T.S.Shaikh 23/12/2018 Letter Issued PHC Level NO

PHC_TadawaleNo Record Found for

VerificationMS T.S.Shaikh 27/12/2018 Letter Issued PHC Level NO

1) MCTS Due services of

ANC & Child record not

maintain of July 17

2) There is no idea of

MCTS user name &

password to HA Male

3) Also no idea of JSY

Private Benificiary

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

PHC Saigaon, SC Dare

Bk, Karandi Dr. A.S. Patil 10/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Kusumbi, SC Mhate

Bk, Ganje Dr. A.S. Patil 06/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

District Satara - THO

PHC Bamnoli, SC Tetali Dr. A.S. Patil 12/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) Block Facilator Not

properly visit to fild For

Montoring ASHA

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

PHC Saigaon, SC Dare

Bk, Karandi Dr. A.S. Patil 20/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Kusumbi, SC Nizare Dr. A.S. Patil 17/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Kelghar, SC

Varoshi, KedambeDr. A.S. Patil 14/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Kudal, SC

Humgaon, WaluthDr. A.S. Patil 12/12/2213

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1) MCTS Due services of

ANC & Child record not

maintain of Feb.17

2) There is no idea of

MCTS user name &

password to HA Male

3)At ANC camp there is no

workplan of ANC from

MCTS software

1)RKS GB&EC Meeting

are not done & not

maintain by proper norms

in 14-1 . & Physical &

financial report is not

verified by

2).Record is not maintain

at proper time & Subcenter

Record Not updated

properly 2 AMG & untied

record is maintain at proper

time 2 Subcenter Not clea

3) pending issue for RKS

Audit fee 14-17

District Satara - Accountant

PHC Kusumbi, PHC

Kelghar SC Malchoundi,

SC Bhanang, RH Medha

Smt. V.V. Karkhanis

07/12/2018

All Identified issues are

disscussed with

concerned Medical

officer & PHC clerk &

SC ANM. As per

instrructions given by us

in visit

At PHC & SC Level Yes

PHC Kudal, SC

Humgaon, WaluthDr. A.S. Patil 28/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Kusumbi, SC Mhate

Bk, Ganje Dr. A.S. Patil 21/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

PHC Saigaon, SC Dare

Bk, Karandi Dr. A.S. Patil 20/12/2018

Tell about MCTS

updation & verify JSY

private beneficiary fill up

in DHIS-2 software also

tell about to keep the

APL & BPL befeciries of

family planning in

statement A & issue the

JSY beneficiries payment

by cross cheque only.

At PHC & SC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1)RKS GB&EC Meeting

are not done& not

maintain by proper norms

in 14-1 . & Physical &

financial report is not

verified by

2).Record is not maintain

at proper time & Subcenter

Record Not updated

properly 2 AMG & untied

record is maintain at proper

time 2 Subcenter Not clea

3) pending issue for RKS

Audit fee 14-17

SC Enkul

1) MCTS Update 2)

Subcenet Delivery 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

03/12/2018 -- -- No --

PHC Pusesawali

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

12/12/2018 -- -- No --

PHC Khatav1) Record Update 2)

Cashbook Update

Dr.Y.R.Shaikh, Tho

07/12/2018 -- -- No --

PHC Ka.Khatav 1) Record Update 2)

Cashbook Update

Dr.Y.R.Shaikh, Tho

10/12/2018 -- -- No --

PHC Pusegaon

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

10/12/2018 -- -- No --

PHC Mayani

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

12/12/2018 -- -- No --

SCBombale

1) MCTS Update 2)

Subcenet Delivery 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

14/12/2018 -- -- No --

PHC Pusegaon 1) Record Update 2)

Cashbook Update

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

PHC Pusegaon

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

District Satara - THO

PHC Bamnoli, SC Tetali,

SC Munawale

Smt. V.V. Karkhanis

20/12/2018

All Identified issues are

disscussed with

concerned Medical

officer & PHC clerk &

SC ANM. As per

instrructions given by us

in visit

At PHC & SC Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Visapur

1) MCTS Update 2)

Subcenet Delivery 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

SC Lalgun

1) MCTS Update 2)

Subcenet Delivery 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

PHC Diskal

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

PHC Mayani

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

17/12/2018 -- -- No --

PHC Ka.Khatav

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

21/12/2018 -- -- No --

PHC Diskal

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

28/12/2018 -- -- No --

PHC Nimsod

1) Record Update 2)

Cashbook Update 3)

Kutumb Kalyan & Delivery

Work Prograse

Dr.Y.R.Shaikh, Tho

28/12/2018 -- -- No --

PHC Diskal ,SC Budh1) Record Update 2)

Cashbook Update

Smt. B.G. Gore, Ac.

14/12/2018

-- --

No

--

PHC Pusegaon, 1) Record Update 2)

Cashbook Update

Smt. B.G. , Ac.

GoreDr.Y.R.Shaikh, Tho

17/12/2018

-- --

No

--

PHC Ka.Khatav1) Record Update 2)

Cashbook Update

Smt. B.G. Gore, Ac

22/12/2018

-- --

No

--

RH Koregaon Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

PHC Rahimtpur Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

SDH Phaltan Inj. Morphine, Inj Fentanyl

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

PHC Barad Inj. Morphine, Inj Fentanyl

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

District Satara - Accountant

District Satara -THO

12-11-2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Mayani

Inj. Morphine, Inj Fentanyl,

Activated charcoal, Inj.

Naloxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

RH Vaduj Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

PHC Shirwal Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

RH Khandala

Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL, Inj.

Lignocaine 2%

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

RH Wai

Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL,

Inj.Hydrocortisone, Inj.

Ondansetrone, Inj.

Amiadarone (50mg/ml), Inj.

Magnesium Sulphate

25%2ml, Inj. Paracetamol

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

PHC Bhuinj Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

PHC Nagthane Tal-Satara Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

PHC Tarale Tal- Patan Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

PHC Kelghar

Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL, Inj.

Lignocaine 2%

21/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

PHC Kudal Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL22/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

SDH Karad

Inj. Adrenaline, Inj.

Morphine, Inj Fentanyl, Inj.

Nalaxone HCL, Tab Aspirin

75mg, Burn Pack

26/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

Malkapur Nagarpachayat

Malkapur

Pain Spray, Inj. Morphine,

Inj Fentanyl, Inj. Nalaxone

HCL, Tab. Isosorbide

Dinitrate 5mg

27/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

Krishna Institute Medical

Science Karad

Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL28/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

MS Level Yes

PHC Parali, Tal-Satara Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

PHC MO Level Yes

Aryangla Hospital Satara Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL

BVG DM & Supervisor

to inform availability

medicine and Equipment.

ACS Level Yes

19/12/2018

20/12/2018

29/12/2018

13/12/2018

15/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

DH Satara Inj. Morphine, Inj Fentanyl,

Inj. Nalaxone HCL31/12/2018

BVG DM & Supervisor

to inform availability

medicine and Equipment.

ACS Level Yes

Maisahe Bawdekar

Highschool Kolhapur1) MR Campaign Visit

DDHS,Dr P.P.Dharurkar

03-12-20181) MR Campaign Visit FACILITY NO FACILITY

RH-

Gaganbawda,Parwadi,RH-

Vaibhwadi,Devgad

1) JSSK Referral ,diet and

consumables

2) NRHM Expenditure

3)PHC Deliverables

4) Check The Malaria

Patient

5) MR Campaign Visit

Dr P.P.Dharurkar

04-12-2018

1) JSSK Referral ,diet

and consumables

2) NRHM Expenditure

3)PHC Deliverables

4) Check The Malaria

Patient

5) MR Campaign Visit

FACILITY NO FACILITY

DHO Office Sangli

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Circle Programe

Manager,Smt.A.V.Kudache

1-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

Circle Kolhapur- DDHS

Circle Kolhapur- CPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH-Gadhinglaj,PHC-

Halkarni

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Smt.A.V.Kudache

11-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

RH-Kagal,PHC-

Sangaon,SC-Kurnur

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Smt.A.V.Kudache

14-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC-A.Lat,RH-Shirol

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Smt.A.V.Kudache

15-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

RH-Ajara,PHC-Uttur

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Smt.A.V.Kudache

18-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH-Tasgaon,PHC-

Chichni

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on CHC Star

Ratning 16-17 & criteria

5)Instruction on

Infrastructure 17-18 For all

facility

6) RCH Portal updation OF

beneficiary,helath providers

mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

Smt.A.V.Kudache

31-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on CHC

Star Ratning 16-17 &

criteria

5)Instruction on

Infrastructure 17-18 For

all facility

6) RCH Portal updation

OF beneficiary,helath

providers mobile

number,Aadhar,Bank

Details,Adhar Seeded

7) Instruction given on

PFMS

FACILITY NO FACILITY

Z.P.Kolhapur

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating 18-

19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal registration

OF beneficiary & Update

Adhar, Bank Details.

M&E OFFICER,Smt

Pratibha Vibhute

15-12-2018

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating

18-19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal

registration OF

beneficiary & Update

Adhar, Bank Details.

FACILITY NO FACILITY

Circle Kolhapur- M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

DMER Kolhapur,

CS Office Kolhapur

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating 18-

19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal registration

OF beneficiary & Update

Adhar, Bank Details.

Smt Pratibha Vibhute

18-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating

18-19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal

registration OF

beneficiary & Update

Adhar, Bank Details.

FACILITY NO FACILITY

KMC Kolhapur

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU Operationlisation

3) Instruction given on

kayakalp baseline assesment

& internal assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating 18-

19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal registration

OF beneficiary & Update

Adhar, Bank Details.

Smt Pratibha Vibhute

20-12-18

1) Instruction Given On

PMSMA & Increase

Involment Of Private

Facility Doctor

2)Instruction Given On

L3/FRU

Operationlisation

3) Instruction given on

kayakalp baseline

assesment & internal

assesment

4)Instruction on HMIS

Portal validation error,

CHC/PHC Star Rating

18-19 & criteria,

and CHC/PHC

Beheaviour& H.R.

Infrastructure For all

facility.

5) RCH Portal

registration OF

beneficiary & Update

Adhar, Bank Details.

FACILITY NO FACILITY

Z.P.Kolhapur

.

1) NHM Relaeated

Programes

2) PPP Programmes

Mr. R. P. Sawadkar (PPP

Coordinator)

15-12-18

1)Instruction given to

authority for display the

banners of Toll free no

102, 104, 108 &

Priscription free service

provider.

2) All staff registered to

HACC (Toll free no.

104) & given

information about PPP

Programe.

3) Given Information Of

NTCP Programe

4)Given Information Of

NCD Programe

5) Check Abulance

Facility NO Facility

Circle Kolhapur- PPP Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

CS Office Kolhapur

DMER Kolhapur

.

1) NHM Relaeated

Programes

2) PPP Programmes

Mr. R. P. Sawadkar (PPP

Coordinator)

18-12-18

1)Instruction given to

authority for display the

banners of Toll free no

102, 104, 108 &

Priscription free service

provider.

2) All staff registered to

HACC (Toll free no.

104) & given

information about PPP

Programe.

3) Given Information Of

NTCP Programe

4)Given Information Of

NCD Programe

5) Check Abulance

Facility NO Facility

KMC Kolhapur

.

1) NHM Relaeated

Programes

2) PPP Programmes

Mr. R. P. Sawadkar (PPP

Coordinator)

20-12-18

1)Instruction given to

authority for display the

banners of Toll free no

102, 104, 108 &

Priscription free service

provider.

2) All staff registered to

HACC (Toll free no.

104) & given

information about PPP

Programe.

3) Given Information Of

NTCP Programe

4)Given Information Of

NCD Programe

5) Check Abulance

Facility NO Facility

RH-Malkapur,

PHC-Bambwade

.

1) NHM Relaeated

Programes

2) PPP Programmes

Mr. R. P. Sawadkar (PPP

Coordinator)

27-12-18

1)Instruction given to

authority for display the

banners of Toll free no

102, 104, 108 &

Priscription free service

provider.

2) All staff registered to

HACC (Toll free no.

104) & given

information about PPP

Programe.

3) Given Information Of

NTCP Programe

4)Given Information Of

NCD Programe

5) Check Abulance

Facility NO Facility

Chandgad

1.about counseling, register,

about reports, outreach

activity, about expenditure

of PIP

Dr Smita Khadare DPM

07/12/7018

Give Instruction

Regarding Ashapana

Work

Facility -Medical Officer- Yes -----

Gadhinglaj Record chacking Dr Smita Khandare DPM

12/12/18

Give Instruction

Regarding Account

Issues

Facility -Medical Officer- Yes -----

BhudargadFor NHm Review meeting

& Alc Record Chacking

Shree Nitin Lohar DAM

12/12/18

Give Instruction

Regarding Cash book &

Audite Guideliness

MO Yes -----

District Kolhapur- DPM

District Kolhapur- DAM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

KarvirFor NHm Review meeting

& Alc Record Chacking

Shree Nitin Lohar DAM

17/12/18

Give Instruction

Regarding Cash book &

Audite Guideliness

MO Yes -----

Panhala Record chacking Shree Nitin Lohar DAM

19/12/18

Give Instruction

Regarding Account

Issues

MO Yes -----

Hatkanagale RH Record chacking Shree Nitin Lohar DAM

24/12/18

Give Instruction

Regarding Account

Issues

MO Yes -----

Ajara Record chacking Shree Nitin Lohar DAM

261/12/18

Give Instruction

Regarding Cash book &

Audite Guideliness

MO Yes -----

GadhinglajFor NHm Review meeting

& Alc Record Chacking

Subhangi Kokate M & E

05/12/18

Give Instruction

Regarding RCH Portal &

MR Reporting

MO Yes -----

Bhudargad RCH Portal Reporting Subhangi Kokate M & E

10/12/18

Give Instruction

Regarding RCH Portal

MR Reporting

MO Yes -----

Kagal RCH Portal Reporting Subhangi Kokate M & E

13/12/18

Give Instruction

Regarding RCH Portal

MR Reporting

MO Yes -----

Panhala RCH Portal Reporting Subhangi Kokate M & E

17/12/18

Give Instruction

Regarding RCH Portal

MR Reporting

MO Yes -----

Radhnagri RCH Portal Reporting Subhangi Kokate M & E

24/12/18

Give Instruction

Regarding RCH Portal

MR Reporting Dist.

MO Yes -----

RH Ajara1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

03-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

PHC Bhadwan1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

5-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

PHC Siddhnerli1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

7-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

PHC Bhadwan1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

10-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

JH IGM 1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

12-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

PHC Kapashi1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

24-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

RH Kagal1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

26-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

District Kolhapur- M&E OFFOCER

District Kolhapur- Dist. AH Co-oridaton

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Seva Rugnalay Kasba

bawada

1.about Inspection of 108

Ambulance

Mrs. Imran jamadar Dist

AH counselor

28-12-2018

1.about 108 Ambulance

Inspection 108 MO yes -----

SDH Gadhinglaj

1.about counseling, register,

about reports, outreach

activity, about expenditure

of PIP

Mrs. Imran jamadar Dist

AH counselor

29-12-2018

counseling to adolescent

clinet, report corretion,

plannig about expnditure

MS yes -----

RH Solankur

1.about counseling, register,

about reports, outreach

activity, about expenditure

of PIP

Mrs. Imran jamadar Dist

AH counselor

31-12-2018

counseling to adolescent

clinet, report corretion,

plannig about expnditure

MS yes -----

RH Gargoti For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

03/12/2018

For IPHS MS / Incharge Sister Yes -----

Rh Kagal For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

05/12/12018

For IPHS MS / Incharge Sister Yes -----

PHC Siddhnerli For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

7/12/2018

PRC Visit MS / Incharge Sister Yes -----

GH IGM For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

10/12/12018

For IPHS MS / Incharge Sister Yes -----

RH Malkapur For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

15/12/2018

For IPHS MS / Incharge Sister Yes -----

PHC Nandani For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

17/12/12018

For IPHS MS / Incharge Sister Yes -----

PHC Gariwade For IPHS

Mrs. Mandar Binawade

IPHS Co-Cordinator

26/12/2018

For IPHS MS / Incharge Sister Yes -----

Rh Nesari For Anganwadi Tapasani

Mrs. Pradnya Sankpal

RBSK Co-Cordinator

12/12/2018

For RBSK Issues MS / Incharge Sister Yes -----

MCL Jaysingpur For Anganwadi Tapasani

Mrs. Pradnya Sankpal

RBSK Co-Cordinator

27/12/2018

For RBSK Issues MS / Incharge Sister Yes -----

Hatkanagale RH 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

2/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Jaysingpur PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

3/012/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

District Kolhapur- RBSK Co-ordinator

District Kolhapur- EMS Co-ordinator

District Kolhapur- IPHS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

N Wadi PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

5/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Mugurwadi PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

7/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

IGM Ichalkaranji 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

12/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

BorpadalePHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

12/012/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Kale PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

15/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Bhadwan PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

18/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Shiroli PHC 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

20/012/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

Hatkanagale RH 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

26/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

IGM Ichalkaranji 108 Ambulance Inspection

Mrs. Vishvanath Gurav

EMS Co-ordinator

29/12/2018

108 Ambulance

Medicines & Instrument

Checking

108 Ambulance MO Yes -----

RH Malkapur

Hospital Visit Hospital

Inspection & Physical

Performance

Dr.Kmpi Patil Civil

Surgeon

03/12/2018

Given Instruction

Regarding Misson

Indradhanushya

MS Yes -----

N Wadi PHC

PHC Visit Hospital

Inspection & Physical

Performance

Dr Yogesh Sale Civil

Surgeon

10/12/2018

Given Instruction

Regarding Hospital

Improvement

MS Yes -----

Jaysingpur PHC

PHC Visit Hospital

Inspection & Physical

Performance

Dr.Kmpi Patil Civil

Surgeon

12/12/2018

Given Instruction

Regarding Hospital

Improvement

MS Yes -----

Rh Khupire

RH Visit Hospital Visit

Hospital Inspection &

Physical Performance

Dr.Kmpi Patil Civil

Surgeon

21/12/2018

Given Instruction

Regarding Misson

Indradhanushya

MS Yes -----

RH Gaganbawada Hospital Inspection Dr.Harshala Vedak RMO

05/12/2018Hospital Checking MS Yes -----

District Kolhapur- CS

District Kolhapur- RMO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Ichalkaranji IGM Hospital Inspection Dr.Harshala Vedak RMO

08/12/12018Hospital Checking MS Yes -----

RH Radhangai Block-

RadhanagariHospital Inspection

Dr.Harshala Vedak RMO

15/12/2018Hospital Checking MS Yes -----

Jaysingpur MCL Hospital Inspection Dr.Harshala Vedak RMO

26/12/2018Hospital Checking MS Yes -----

Rh kagal Record checkingMR. Ningoji Patil. BFO

07/12/18

To Instruct to complet all

cash book & Audit

complinance

MS & OS Yes -----

RH Ajara Record checkingMR. Ningoji Patil. BFO

17/12/18

To Instruct to complet all

cash book & Audit

complinance

MS & OS Yes -----

RH Malkapur Record checkingMR. Ningoji Patil. BFO

27/12/18

To Instruct to complet all

cash book & Audit

complinance

MS & OS Yes -----

Chandgad For IPHS SpecialistDr Yogesh Sale DHO

03/12/18

Give instruction

Regarding Set up &

Guideliness of BSU

MS / Incharge Sister Yes -----

Bhudargad For NHM Review MeetingDr Yogesh Sale DHO

05/12/18MR Visit ----- Yes -----

Hatkanagale RH Kanyagat Mahaparv MeetDr Yogesh Sale DHO

12/12/18MR Visit ----- Yes -----

Jaysingpur PHC For NHM ReviewDr Yogesh Sale DHO

14/12/18MR Visit ----- Yes -----

Rh Malkapur For NHM ReviewDr Yogesh Sale DHO

17/12/18MR Visit MS Yes -----

Kagal 118 Ambulance Inspection Dr Yogesh Sale DHO

26/12/8

118 Ambulance

Medicines & Instrument

Checking

----- Yes

Radhnagari 118 Ambulance Inspection Dr Yogesh Sale DHO

29/12/8

118 Ambulance

Medicines & Instrument

Checking

118 Ambulance MO Yes -----

RH SolankurNHM Account Record

chacking

Dr Usha devi Kumbhar/ Dr

Madane ADHO

07/12/18

MR Visit MS Yes -----

MCL JaysNHM Account Record

chacking

Dr Usha devi Kumbhar/ Dr

Madane ADHO 12/12/18MR Visit MS Yes -----

RH MalkapurNHM Account Record

chacking

Dr Usha devi Kumbhar/ Dr

Madane ADHO

14/12/18

MR Visit MS Yes -----

District Kolhapur- ADHO

District Kolhapur- BFO

District Kolhapur- DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH NesariNHM Account Record

chacking

Dr Usha devi Kumbhar/ Dr

Madane ADHO

17/12/18

MR Visit MS Yes -----

PHC P ShiroliNHM Account Record

chacking

Dr Usha devi Kumbhar/Dr

Madane ADHO

27/12/18

Hospital Checking MS Yes -----

Kagal block Hospital Inspection Dr Desai DRCHO

07/12/2018MR Visit MS Yes -----

Panhala All VHNSC Records Dr Desai DRCHO

08/12/2018MR Visit MS Yes -----

Chandgad All VHNSC Records Dr Desai DRCHO

12/12/2018MR Visit MO Yes -----

Ajara For NHM ReviewDr Desai DRCHO

21/12/2018MR Visit MS Yes -----

RH PanhalaAll records and reports are

up to date and fullfilled

Dist Ayush Officer,Dr

Sonavane 12/12/2018

report submitted to

Resp. DHO sir----- yes -----

RH Gargoti All records and reports are

up to date and fullfilled Dr Sonavane 15/12/2018

report submitted to

Resp. DHO sir----- yes -----

RH DattwadAll records and reports are

up to date and fullfilled Dr Sonavane 19/12/2018

report submitted to

Resp. DHO sir----- yes -----

RH Pargaon

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Sonavane 26/12/2018report submitted to

Resp. DHO sir----- yes -----

Hatkanagale All records and reports are

up to date and fullfilled

Zilla Sahhyak Ayush

Officer, Dr Nale MO

04/12/2018

report submitted to

Resp. DHO sir----- yes -----

RH Ajara

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Nale MO 07/12/2018report submitted to

Resp. DHO sir----- yes -----

RH Ajara

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Nale MO 12/12/2018report submitted to

Resp. DHO sir----- yes -----

District Kolhapur- DRCHO

District Kolhapur- Dist.Ayush Officer

District Kolhapur- Zilla Sahhyak Ayush Officer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Pargaon

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Nale MO 15/12/2018report submitted to

Resp. DHO sir----- yes -----

SDH Gadhinglaj

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Nale MO 17/12/2018report submitted to

Resp. DHO sir----- yes -----

RH Nesari

All records and reports are

NOT up to date and

fullfilled Expiry Medicine

Found Cashbook Not

Properly maintained

Dr Nale MO 25/12/2018report submitted to

Resp. DHO sir----- yes -----

RH GargotiAll records and reports are

up to date and fullfilled Dr Nale MO 29/12/2018

report submitted to

Resp. DHO sir----- yes -----

Ajara Block PHC &SCRch & DHIS2 & MR

Review Meeting

Shri Abhay Deshpande

Additional charge of So

06/12/2018

Give Instuction to

concern Adhikari &

karmachari about RCH

& HMIS

----- Yes -----

Radhnagari PHCRch & DHIS2 MR

Review Meeting

Shri Abhay Deshpande

Additional charge of So

13/12/2018

Give Instuction to

concern Adhikari &

karmachari about RCH

& HMIS

----- Yes -----

MCL JaysingpurRch & DHIS2 MR Review

Meeting

Shri Abhay Deshpande

Additional charge of So

19/12/2018

Give Instuction to

concern Adhikari &

karmachari about RCH

& HMIS

----- Yes -----

Rh kagalRch & DHIS2 MR Review

Meeting

Shri Abhay Deshpande

Additional charge of So

27/12/2018

Give Instuction to

concern Adhikari &

karmachari about RCH

& HMIS

----- Yes -----

RVS , THO GARIVADEBBM AND PLASTER

AND OFFICE WORK

Shree Sachin Chavan DYE

12/12/2018STRUCTURAL STEEL

DESIGN,IDW LEVEL Yes -----

Saravade & Tarale PhC parking shed

Shree Sachin Chavan DYE

20/12/2018STRUCTURAL STEEL

DESIGN,IDW LEVEL Yes -----

BORPADALE, KOTOLI,

, RH MALKAPUR,

PARALI NINAI

WATER SUPPLY WORK

Shree Sachin Chavan

DYE 29/12/2018RVS , THO

GARIVADE

BBM AND PLASTER AND

OFFICE WORK

phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE

2/12/2018phc bhedasgaon, PLASTER, BBM Yes -----

District Kolhapur- Jr.Engineer

District Kolhapur- SO

District Kolhapur- Dy.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RVS BBM AND PLASTERShri Vinod Koli JE

3/12/2018RVS BBM AND PLASTER Yes -----

phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE

13/12/2018phc bhedasgaon, PLASTER, BBM

phc bhedasgaon, COLOURShri Vinod Koli JE

14/12/2018phc bhedasgaon, PLASTER, BBM Yes -----

RVS BBM AND PLASTERShri Vinod Koli JE

20/12/2018RVS BBM AND PLASTER Yes -----

phc bhedasgaon, PLASTER, BBMShri Vinod Koli JE

21/12/2018phc bhedasgaon, PLASTER, BBM

phc bhedasgaon, COLOURShri Vinod Koli JE

24/12/2018phc bhedasgaon, PLASTER, BBM Yes -----

RVS , THO GARIVADEBBM AND PLASTER

AND OFFICE WORK

Shri Vinod Koli JE

29/12/2018

RVS , THO

GARIVADE

BBM AND PLASTER AND

OFFICE WORK

RVS BBMShri Vinod Koli JE

31/12/2018RVS BBM Yes -----

SAVA RUGANLYA..

K.BAWADA, RH

KAGAL

Site visit A. M. Madiwal . Jounior

Enggineer 1/12/2018PLASTERING WORK IDW LEVEL Yes -----

THO SHIROL, RH

SHIROL

OFFICE WORK,SITE

VISIT

A. M. Madiwal . Jounior

Enggineer 3/12/2018RH OBSERVATION IDW LEVEL Yes -----

PHC CHIKALI Site visit A. M. Madiwal . Jounior

Enggineer 4/12/2018

13 th finance L.R.

UpgradationIDW LEVEL Yes -----

SAVA RUGANLYA..

K.BAWADA, PHC

SAWARDE

Site visit A. M. Madiwal . Jounior

Enggineer 5/12/2018 ,PHC OBSERVATION IDW LEVEL Yes -----

PHC

P.KODOLI,NADANISite visit

A. M. Madiwal . Jounior

Enggineer 7/12/2018 ,PHC OBSERVATION IDW LEVEL Yes -----

SAVA RUGANLYA..

K.BAWADA,PHC hupariSite visit

A. M. Madiwal . Jounior

Enggineer 12/12/2018

SITE VISIT Fabrication

work ,PHC

OBSERVATION

IDW LEVEL Yes -----

SAVA RUGANLYA..

K.BAWADA,Site visit

A. M. Madiwal . Jounior

Enggineer 13/12/2018PLASTERING WORK IDW LEVEL Yes -----

District Kolhapur- Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SAVA RUGANLYA..

K.BAWADA PHC A.LAT,Site visit

A. M. Madiwal . Jounior

Enggineer 17/12/2018PLASTERING WORK IDW LEVEL Yes -----

SAVA RUGANLYA..

K.BAWADA,Site visit

A. M. Madiwal . Jounior

Enggineer 21/12/2018PLASTERING WORK IDW LEVEL Yes -----

THO SHIROL, RH

SHIROL

OFFICE WORK,SITE

VISIT

A. M. Madiwal . Jounior

Enggineer24/12/2018RH OBSERVATION

SAVA RUGANLYA..

K.BAWADA PHC

DANOLI,

Site visit A. M. Madiwal . Jounior

Enggineer 26/12/2018

SITE VISIT Fabrication

work ,PHC

OBSERVATION

IGM Site visit A. M. Madiwal . Jounior

Enggineer 31/12/2018

13th finance L.R.

UpgradationIDW LEVEL Yes -----

PHC MALIGRE TAL

AAJRASite visit

MANJEET PATIL .

Jounior Enggineer

3/12/2018

Site visit IDW LEVEL Yes

PHC NOOL TAL

GADHINGLAJSite visit

MANJEET PATIL .

Jounior Enggineer

4/12/2018

Site visit IDW LEVEL Yes -----

SHENDA PARK & HEAD

OFFICESite visit

MANJEET PATIL .

Jounior Enggineer

13/12/2018

Site visit IDW LEVEL Yes -----

PHC MAHAGOAN TAL

GADHINGLAJSite visit

MANJEET PATIL .

Jounior Enggineer

19/12/2018

Site visit IDW LEVEL Yes -----

PHC-Nandani,

Block-Shirol

For RKS record cheking

and VHNSC Asha member

secretary discussion

Mrs. Pallavi S. Nakate,

RKS Co.ordinator Kolhapur

11/12/2018

Instruct to complete the

points which are

observed in record

cheking

DISTRICT YES PHC Level

RH- Khupire, Block-

KarveerFor RKS record cheking

Mrs. Pallavi S. Nakate,

12/12/2018

Instruct to complete the

points which are

observed in record

cheking

DISTRICT YES RH LEVEL

PHC-Pulachi Shiroli,

Block-Shirol

For RKS record cheking

and VHNSC Asha member

secretary discussion

Mrs. Pallavi S. Nakate,

13/12/2018

Instruct to complete the

points which are

observed in record

cheking

DISTRICT YES RH LEVEL

District Kolhapur- Jr.Engineer

District Kolhapur- RKS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Office Shahuwadi

Guided to ASHA and

Anganwadi Sevika in

metting, BF record

checking

Mrs. Pallavi S.

Nakate, RKS Co.ordinator

Kolhapur 15/12/2018

Instructions given to

BCM and BF regarding

field visit and record

updation

Facility -BCM Yes PHC Level

PHC Amba, Block

Shahuwadi

Guided to ASHA and

Anganwadi Sevika in

metting, BF record

checking, HBNC

beneficiary visit

Mrs. Pallavi S. Nakate,

RKS Co.ordinator Kolhapur

29/12/2018

Instructions given to

BCM and BF regarding

field visit and record

updation

Facility -BCM Yes PHC Level

PHC NandaniBF record checking and

HBNC beneficiary visit

N.E. Khan

District Community

Mobiliser kolhapur

11/12/2018

Instructions given to

BCM and BF regarding

field visit and record

updation

Facility - BCM Yes -----

PHC BhadoleBF record checking and

HBNC beneficiary visit

N.E. Khan

District Community

Mobiliser kolhapur

13/12/2018

Instructions given to BF

regarding field visit and

record updation

Facility -BCM Yes -----

Block Shahuwadi

Guided to ASHA and

Anganwadi Sevika in

metting, BF record

checking

N.E. Khan

District Community

Mobiliser kolhapur

15/12/2018

Instructions given to

BCM and BF regarding

field visit and record

updation

Facility -BCM Yes -----

PHC Amba

Guided to ASHA and

Anganwadi Sevika in

metting, BF record

checking, HBNC

beneficiary visit

N.E. Khan

District Community

Mobiliser

kolhapur29/12/2018

Instructions given to

BCM and BF regarding

field visit and record

updation

Facility -BCM Yes -----

Phc

watangi,shirsangi,dhabhil

All record checking all

Financial Record of PHC

AJARA THO,Dr.R.K.Khot

12/12/2018All record of

Immunization MO Level Yes Facility

Phc bhadwan,khed,pernoliAll record checking all

Financial Record of PHC Dr.R.k.Khot18/12/2018

All record of

Immunization MO Level Yes Facility

Phc utturAll record checking all

Financial Record of PHC Dr.R.k.Khot 21/11/2019

All record of

Immunization MO Level Yes Facility

PhcMaligre,suleAll record checking all

Financial Record of PHC

AJARA

ACCOUNTANT,Kusum

Suresh Chavan 18/12/2018

1) Cash book is up to

date.2) All record done

by Me

ANM Level Yes Facility

PHC bhadwani,salgaonAll record checking all

Financial Record of PHC

Kusum Suresh

Chavan27/12/2018

1) Cash book is up to

date.2) All record done

by Me

ANM Level Yes Facility

phc Pimpalgoan All record checking all

Financial Record of PHC

Dr.R.R.Shetye

,BHDARGAD THO

3/12/18

RKS meeting Clerk Level Yes Facility

District Kolhapur- Accountant

District Kolhapur- THO Bhdargad

District Kolhapur- DCM

District Kolhapur- THO Ajara

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Minche KhAll record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 5/12/2018

1) Cash book is up to

date.2) All record

Complete to complit

Audit record

Clerk Level Yes Facility

phc Pimpalgoan All record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 8/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

phc Kadgaon All record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 12/12/18

1) Cash book is up to

date.2) All record

Complete to complit

Audit record

Clerk Level Yes Facility

PHC PatgaonAll record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 17/12/2018

1) Cash book is up to

date.2) All record

Complete to complit

Audit record

Clerk Level Yes Facility

PHC Madilge buAll record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 19/12/2018

RKS Record incomplit

and Audit para for Rks

statutary audit pendig

Clerk Level Yes Facility

phc Pimpalgoan All record checking all

Financial Record of PHC

Dr.R.R.Shetye

THO 24/12/2018

1) Cash book is up to

date.2) All record

Complete to complit

Audit record

Clerk Level Yes Facility

SC pimpalganAll record checking all

Financial Record of SC

Dr.R.R.Shetye

THO 28/12/2018

1) Cash book is up to

date.2) All record

Complete to complit

Audit record

Clerk Level Yes Facility

PHC Patgaon KhAll record checking all

Financial Record of SC

Dr.R.R.Shetye

THO 29/12/18

Review of PMSMA

registger EDD and EPD

register taken as there

were lot of mistakes in

both registers MO and

LHV both given

instructions how to keep

record of both registers.

OPD cash book of clerk

verified found correct. E

aushadhi cross verified

with medicine stock book

found corect.

MO level Yes Facility

phc Kadgaon All record checking all

Financial Record of PHC

S B Gharal Block

Accountant 4/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

PHC PatgaonAll record checking all

Financial Record of PHC

S B Gharal Block

Accountant 6/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

District Kolhapur- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC SheloliAll record checking all

Financial Record of SC

S B Gharal Block

Accountant 7/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

PHC PimpalgoanAll record checking all

Financial Record of PHC

S B Gharal Block

Accountant 10/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

PHC PatgaonAll record checking all

Financial Record of PHC

S B Gharal Accountat

20/12/18

1) Cash book is up to

date.2) All record

Complete

ANM Level Yes Facility

PHC PimpalgoanAll record checking all

Financial Record of PHC

S B Gharal Accountat

21/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

PHC MinchekhAll record checking all

Financial Record of PHC

S B Gharal Accountat

27/12/18

1) Cash book is up to

date.2) All record

Complete

Clerk Level Yes Facility

PHC Patgaon KhAll record checking all

Financial Record of SC

Dr.R.R.Shetye

THO 29/12/18

Review of PMSMA

registger EDD and EPD

register taken as there

were lot of mistakes in

both registers MO and

LHV both given

instructions how to keep

record of both registers.

OPD cash book of clerk

verified found correct. E

aushadhi cross verified

with medicine stock book

found corect.

MO level Yes Facility

PHC - tudiye

1.Cash Book is NOT

completed NOV & DEC -

18

2. VOUCHAR IS NOT

COMPLETED NOV &

DEC -18

3.BRS NOT completed

NOV -18

Mr.B.A.Sutar

Block Accountant -

11.12.2018

1) Cash book is NOT

up to date.2) All record

isNOT up date

Clerk Level Yes -----

PHC -MANGAON

1.Cash Book is NOT

completed Nov & dec -18

2.VOUCHAR IS NOT

COMPLETED Nov & Dec -

18

3.BRS NOT completed oct

& nov -18

4.nhm exp not done

Mr.B.A.Sutar

Block Accountant -

14.12.2018

1) Cash book is not up to

date.2) All record is not

up date

Clerk Level Yes -----

District Kolhapur- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC -kanur

1.Cash Book is NOT

completed nov & dec -18

2.VOUCHAR IS NOT

COMPLETED nov -18

3.BRS NOT completed nov

-18

Mr.B.A.Sutar

Block Accountant -

18.12.2018

1) Cash book is not up to

date.2) All record is not

up date

Clerk Level Yes -----

phc -here

1.Cash Book is NOT

completed oct & Nov -18

2.VOUCHAR IS NOT

COMPLETED oct & nov -

18

3.BRS NOT completed oct

& nov -18

Mr.B.A.Sutar

Block Accountant -

28.12.2018

1) Cash book is not up to

date.2) All record is not

up date

Clerk Level Yes -----

phc- ADKUR

1.Cash Book is NOT

completed Nov & dec -18

2.VOUCHAR IS NOT

COMPLETED Nov & dec -

18

3.BRS NOT completed

Nov -18

Mr.B.A.Sutar

Block Accountat

27.12.2018

1) Cash book is not up to

date.2) All record is not

up date

Clerk Level Yes -----

phc- kowad

1.Cash Book is NOT

completed Nov & Dec -18

2.VOUCHAR IS NOT

COMPLETED Nov & dec -

18

3.BRS NOT completed

Nov -18

Mr.B.A.Sutar

Block Accountant -

28.12.2018

1) Cash book is not up to

date.2) All record is not

up date

Clerk Level Yes -----

1 PHC - Gariwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

THO

Gaganbawada Additional

Charge of M.O. PHC -

Garivade 3/12/2018

THO

Gaganbawada Additional

Charge of M.O. PHC -

Garivade 3/12/2018

Facility - by THO Office Staff &

CDPO.Yes -----

1 PHC - Niwade

PHC NIWADE - Record

Checking & NRHM &

RKS

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/5/2018

Vesarde - 1)

Imunaisation setion Visit

2) Review All Software

Adava with ANM,

MPW

Facility - by THO Office Staff &

CDPO.Yes -----

District Kolhapur- THO Gaganbawada

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1 PHC - Gariwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/12/2018

THO Work - 1) THO

Office Work & Sign. 2)

All letters read & inst. To

EOH for proper Action.

4) NRHM Financial all

Head Adava & Expences

adava with Block

Accountant . 4) RKS &

VHNSC Exp. Adava

with Accountant &

CDPO.

Facility - by THO Office Staff &

CDPO.Yes -----

DAM KolhapurKoLHAPUR TALLY

Software information

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/12/2018

PHC Niwade - 1) PHC

OPD/IPD Adava Taken

with MO & LHV 2)

RCH Software &

Register Adava taken of

MO & LHV - instructed.

4) RKS & NRHM all

Headwise Adava taken &

planed for Exp. 5) All

Financial Signatures fo

NRHM & Rugular Made

& Recird Updated.

Facility - by THO Office Staff &

CDPO.Yes -----

1 PHC - Niwade

PHC NIWADE - Record

Checking & NRHM &

RKS

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/15/2018

PHC Niwade - 1) PHC

OPD/IPD Adava Taken

with MO & LHV 2)

RCH Software &

Register Adava taken of

MO & LHV - instructed.

4) RKS & NRHM all

Headwise Adava taken &

planed for Exp. 5) All

Financial Signatures fo

NRHM & Rugular Made

& Recird Updated.

Facility - by THO Office Staff &

CDPO.Yes -----

1 PHC - Gariwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/15/2018

THO Work - 1) THO

Office Work & Sign. 2)

All letters read & inst. To

EOH for proper Action.

4) NRHM Financial all

Head Adava & Expences

adava with Block

Accountant . 4) RKS &

VHNSC Exp. Adava

with Accountant &

CDPO.

Facility - by THO Office Staff &

CDPO.Yes -----

2 SC - Asansodi &

Mandukali

Record Checking & UF

& AMG

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/21/2018

Attended PCPNDT &

Bogas Dr - Taluka

Workshop @ G. Bawada -

Gidence & Training

given to All Staff .

Facility - by THO Office Staff &

CDPO.Yes -----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1 PHC - Gariwade &

Baveli

PHC GARIWADE -

Record Checking & NRHM

& RKS

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC -

Garivade12/212/2018

THO Work - 1) THO

Office Work & Sign. 2)

All letters read & inst. To

EOH for proper Action.

4) NRHM Financial all

Head Adava & Expences

adava with Block

Accountant . 4) RKS &

VHNSC Exp. Adava

with Accountant &

CDPO.

Facility - by THO Office Staff &

CDPO.Yes -----

DTT kolhapurKOLHAPUR

Monthly Meeting

12 -

THO Gaganbawada

Additional Charge of M.O.

PHC - Garivade12/30/2018

PHC Niwade - 1) PHC

OPD/IPD Adava Taken

with MO & LHV 2)

RCH Software &

Register Adava taken of

MO & LHV - instructed.

4) RKS & NRHM all

Headwise Adava taken &

planed for Exp. 5) All

Financial Signatures fo

NRHM & Rugular Made

& Recird Updated.

Facility - by THO Office Staff &

CDPO.Yes -----

PHC Gariwade - 1) PHC

OA210:H216PD/IPD

Adava Taken. 2) RCH

Software & Register

Adava. 4) RKS & NRHM

Grants Exp. Adava.

PHC Gariwade - 1) PHC

OPD/IPD Adava Taken.

2) RCH Software &

Register Adava. 4) RKS &

NRHM Grants Exp. Adava.

Dr. Shobha Suryanshi -

THO 1212/12/12018

PHC Gariwade - 1) PHC

OPD/IPD Adava Taken

with MO & LHV 2)

RCH Software &

Register Adava taken of

MO & LHV - instructed.

4) RKS & NRHM all

Headwise Adava taken &

planed for Exp.

Facility - by THO Office Staff &

CDPO.Yes -----

1 PHC - Niwade

PHC NIWADE - Record

Checking & NRHM &

RKS

THO

Gaganbawada Additional

Charge of M.O. PHC -

Garivade 5/12/2018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

1 PHC - Gariwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

THO

Gaganbawada Additional

Charge of M.O. PHC -

Garivade 12/12/2018

Record Checking &

MCTS Updation

Instruction Given for Quality

Servises to Patients & Record CheckYes -----

DAM KolhapurKoLHAPUR TALLY

Software information

Additional Charge of THO

Gaganbawada to M.O. PHC

- Garivade 14/12/12018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

1 PHC - Niwade

PHC NIWADE - Record

Checking & NRHM &

RKS

Additional Charge of THO

Gaganbawada to M.O. PHC

- Garivade 18/12/2018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

District Kolhapur- THO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1 PHC - Gariwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

Additional Charge of THO

Gaganbawada to M.O. PHC

- Garivade 20/12/2018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

2 SC - Asansodi &

Mandukali

Record Checking & UF

& AMG

Additional Charge of THO

Gaganbawada to M.O. PHC

- Garivade 24/12/2018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

1 PHC - Gariwade &

Baveli

PHC GARIWADE -

Record Checking & NRHM

& RKS

Additional Charge of THO

Gaganbawada to M.O. PHC

- Garivade 29/12/2018

Record Checking &

MCTS Updation & Also

Kayapalat Adava

Instruction Given for Quality

Servises to Patients & Record

Check. Kayapalat Adava &

Instructions given to ANM

Yes -----

1 PHC - Gariwade SC Kirve & Asandoli -

Record Checking & NRHM

Shri Deepak Kambale Acc

12/3/2018

PHC GARIWADE -

Record Checking &

NRHM & RKS

PHC GARIWADE - Record

Checking & NRHM & RKS Yes -----

1 PHC - Niwade PRC - NRHM RecordShri Deepak Kambale Acc

12/4/2018

PHC NIWADE -

Record Checking &

NRHM & RKS

PHC NIWADE - Record Checking

& NRHM & RKS Yes -----

2 PHC - Niwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

Shri Deepak Kambale Acc

12/6/2018

PHC NIWADE -

Record Checking &

NRHM & RKS

PHC NIWADE - Record Checking

& NRHM & RKS Yes -----

DTT KolhapurKOLHAPUR THO &

PHC Audit

Shri Deepak Kambale Acc

12/10/2018

KOLHAPUR - PFMS

Software Update

KOLHAPUR - PFMS Software

UpdateYes -----

SC Asandoli & Mandur2 SC - Record Checking &

NRHM

Shri Deepak Kambale Acc

12/18/2018

SC - Record Checking &

NRHM SC - Record Checking & NRHM Yes -----

DTT Kolhapur

PHC NIWADE - Record

Checking & NRHM &

RKS Meeting Planing

Shri Deepak Kambale Acc

12/21/2018

KOLHAPUR -

Meedting KOLHAPUR - Meedting Yes -----

1 PHC - Niwade

PHC GARIWADE -

Record Checking & NRHM

& RKS

Shri Deepak Kambale Acc

12/24/2018

PHC NIWADE -

Record Checking &

NRHM & RKS

PHC NIWADE - Record Checking

& NRHM & RKS Yes -----

Umbarwadi MR campaign visit

THO GADHIGLAJ, DR M

V ATHANI THO

01/12/2018THO

GADHIGLAJ,

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes -----

District Kolhapur- Accountant

District Kolhapur- THO GADHIGLAJ

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Badyachiwadi, Mutnal,

ChanekuppiMR campaign visit

DR M V ATHANI THO

03/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes -----

Mahagaon, Harli KH.,

Hebbal Jal, HadalageMR campaign visit

DR M V ATHANI THO

04/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes -----

Tavrewadi, Bhadgaon,

Harali BK, Sambre,

Nesari

MR campaign visit DR M V ATHANI THO

05/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes -----

Teginhal, Terani,

KavalikattiMR campaign visit

DR M V ATHANI THO

06/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Hunginhal, Nesari,

Narewadi, HasurwadiMR campaign visit

DR M V ATHANI THO

10/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Nesari, Hebbal Jaldyal MR campaign visit DR M V ATHANI THO

11/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Hadalge, Sambre MR campaign visit DR M V ATHANI THO

12/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Chikhali, Kagal Kayakalp VisitDR M V ATHANI THO

13/12/2018

Kayakalp Visit to chikali

PHC regarding

inspection

THO, MO Yes

Vagharali, Bidrewadi,

Helewadi, ShippurMR campaign visit

DR M V ATHANI THO

14/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Mutnal, dundage MR campaign visit DR M V ATHANI THO

15/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Basarge, Yenechvandi MR campaign visit DR M V ATHANI THO

17/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Nesari MR campaign visit DR M V ATHANI THO

18/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Bhadgaon MR campaign visit DR M V ATHANI THO

19/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Mungurwadi, Halkarni MI & Mi Inspection DR M V ATHANI THO

24/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Mahagaon. Hiddugi MI & Mi Inspection DR M V ATHANI THO

26/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Nesari MI & Mi Inspection DR M V ATHANI THO

27/12/2018

Given instruction about

AEFI

Given instruction about

100 % vaccinication

Given instruction about

ill children

ANM & Medical Officer Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Mungurwadi,

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

11/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Kanadewadi

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

11/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Mahagaon

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

12/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

District Kolhapur- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kadgaon

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

12/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Halkarni,

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

19/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

SC Narewadi

1.Cash book is completed

2.Stock book is incompleted

3.SC Balkatikaran

committee meeting not

arranged as per norms

4. Proceding is incomplete

5. Open all JSY

benificiaries accounts

Mr S V desai

Block Accountant

19/12/2018

1) Given Instruction to

ANM to complete all the

record and arrange sc

balkatikaran committee

meeting as per norms

2) Given Instruction

about 100 % Expenditure

3. Given instruction

about Jsy Benefit from

THO office since 1 Sept

through CPSMS/PFMS

4. Given guidelines to

VHNSC Expenditure

5. SC UF AMG amount

is released do needful

action.

PHC Clerk & Medical Officer Yes -----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Mungurwadi

1. Cash Book is

incompleted till date.

2. Procedding book is

incomplete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

26/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Mahagaon

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Mr S V desai

Block Accountant

26/12/2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Pulachi shiroli

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

THO HATKANGALE

,Dr S Kore THO 17-12-

2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

District Kolhapur- THO Hatkagale

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Sajani

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Dr S Kore THO 19-12-

2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Sawarde

1.Cash book is completed

2.Stock book is incompleted

3.SC Balkatikaran

committee meeting not

arranged as per norms

4. Proceding is incomplete

5. Open all JSY

benificiaries accounts

Dr S Kore THO 24-12-

2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC Ambap

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Dr S Kore THO 26-12-

2018

1) Given Instruction to

ANM to complete all the

record and arrange sc

balkatikaran committee

meeting as per norms

2) Given Instruction

about 100 % Expenditure

3. Given instruction

about Jsy Benefit from

THO office since 1 Sept

through CPSMS/PFMS

4. Given guidelines to

VHNSC Expenditure

5. SC UF AMG amount

is released do needful

action.

PHC Clerk & Medical Officer Yes -----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Alate

1. Cash Book is completed

till date.

2. Procedding book is

complete

3. Stock book & other

record completed

4. RKS Meeting Not

arranged

5. Concurent Audit para

compliance not done

6. open all Jsy Labharthi

account as soon as possible

7. Plan for 100%

expenditure

Dr S Kore THO 29-12-

2018

1. All incomplete record

is completed by me

through given

insturuction

2. Discus with MO and

Clerk for arranging EC

RKS meeting

3. Given instruction

regarding 100 %

expenditure

4. prapre paln for

expenditure

5. Given instruction to

comply all audit paras

6. Given guidelines to

VHNSC Expenditure

PHC Clerk & Medical Officer Yes -----

PHC SIDHNERLI

1)M O & Clerk Joint A/c

not Opended 2) NRHM &

RKS cash book incompleted

4) F P & JSY Payment not

done 4) Concurrent Audit

not done

THO KAGAL,DR Khot

THO 08/12/7018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

also complte RKS Audit

Facility -PHC Clerk & Medical

OfficerYes ----

PHC CHIKHALI

1) NRHM & RKS cash

book incompleted 3) F P &

JSY Payment not done

3)Audit Compliance not

done

DR Khot ,THO

Dt.24/12/18

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

Facility -PHC Clerk & Medical

OfficerYes ----

S C BELEWALE KH.

1) Cash book incomplted 2)

BRS Not Made 4) Vouchers

not filling properly

DR Khot THO 29/12/70181) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

Facility -PHC Clerk & Medical

OfficerYes ----

PHC SIDHNERLI

1)M O & Clerk Joint A/c

not Opended 2) NRHM &

RKS cash book incompleted

3) F P & JSY Payment not

done

Mr. S H GOSAVI, Block

Accountant Dt.07-12-18

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

also complte RKS Audit

Facility -PHC Clerk & Medical

OfficerYes ----

PHC PIMPALGAON

1)M O & Clerk Joint A/c

not Opended 2) NRHM &

RKS cash book incompleted

3) F P & JSY Payment not

done

Mr. S H GOSAVI, Block

Accountant Dt.12-12-18

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

Facility -PHC Clerk & Medical

OfficerYes ----

District Kolhapur- THO Kagal

District Kolhapur- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC CHIKHALI

1) NRHM & RKS cash

book incompleted 3) F P &

JSY Payment not done

3)Audit Compliance not

done

Mr. S H GOSAVI, Block

Accountant Dt.25-12-18

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

Facility -PHC Clerk & Medical

OfficerYes ----

S C SONGAE

1) Cash book incomplted 2)

BRS Not Made 3) Vouchers

not filling properly

Mr. S H GOSAVI, Block

Accountant Dt.29-12-18

1) Instructions given for

Complte the cash book,

update Voucher file , &

BRS made

Facility - SC ANM Yes ----

Hasur du FP performance is poorTHO KARVEER,Dr

Nalawade THO 1/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

Bhuye Delivery and RCH portal

performance is poor.

Dr Nalawade THO

4/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending

payment, Expenditure

made 100% againgst

received grant

Improve the PHC Delivery Yes ----

Ispurli Delivery and RCH portal

performance is poor.

Dr Nalawade THO

5/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

MudshingiFP,Delivery and RCH portal

performance is poor

Dr Nalawade THO

6/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending

payment, Expenditure

made 100% againgst

received grant

Improve the PHC Delivery Yes ----

District Kolhapur- THO Karveer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

KaneriFP and RCH portal

performance is poor.

Dr Nalawade THO

7/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

UnchgaonFP and Delivery

performance is poor.

Dr Nalawade THO

15/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending

payment, Expenditure

made 100% againgst

received grant

Improve the PHC Delivery Yes ----

VadangeFP and Delivery

performance is poor.

Dr Nalawade THO

18/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

SangrulFP and Delivery

performance is poor.

Dr Nalawade THO

19/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

Shiroli duFP and Delivery

performance is poor.

Dr Nalawade THO

20/12/2018

1) Instructions given for

Joint A/c Open & for

Complete the Cash

Books & complete the

FP, JSY Pending paymet

and also complete

Concurrent Audit,

Expenditure made 100%

againgst received grant

Improve the PHC Delivery Yes ----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kale

1.All NHM record is

completed till date

2 RKS GB MEETING

Mr. D.M.Vategave ,

THO PANHALA Block

Accountant -

04/12/2018

1.All record is completed

by me (Block Accountat)

with the help M O till

date

2.RKS GB MEETING

Facility - Medical Officer Yes ----

PHC KEKHALE

1. NHM record is

incommpleted till date

2 RKS GB MEETING

Mr. D.M.Vategave

Block Accountant -

15/12/2018

1.Instruct M O and Jr

Clerk to complete all

record time to time with

help of other staff and

block accountant

2.RKS GB MEETING

Facility - Medical Officer Yes ----

PHC BORPADALE

1.CASH BOOK NOT

UPDATED IN 2018-19

2-JSY FP DBT PAYMENT

NOT YET IN 2018-19

3.PROCEDING OF FIRST

EC AND GB MEETING IS

INCOMPLETE

Mr. D.M.Vategave

Block Accountant -

21/12/2018

1.Instruct M O and Jr

Clerk to complete all

record time to time with

help of other staff and

block accountant

Facility - Medical Officer Yes ----

SC ARALEALL NHM RECORD

INCOMPLETE

Mr. D.M.Vategave

Block Accountant -

26/12/2018

1.Instruct ANM to

complete all record time

to time with help of block

accountant

Facility - ANM Yes ----

PHC BORPADALE

1. NHM Cash book not

updated from sep 18

2.procedding of ec meeting

incomplete

3-Audit compliance pending

for 18-19 Q1 Q2 and 17-18

statutory audit

Mr. D.M.Vategave

Block Accountant -

1212/2018 26/12/2018

instruct Jr clerk to to

complete all record time

to time with help of block

accountant and made

compliance of all

pending audit paras

Facility - Medical Officer Yes ----

PHC KEKHALE

1.All NHM record is

completed till date

2-Audit compliance pending

for 18-19 Q1 Q2 and 17-18

statutory audit

Mr. D.M.Vategave

Block Accountant -

13/12/2018

instruct Jr clerk to to

complete all record time

to time with help of block

accountant and made

compliance of all

pending audit paras

Facility - Medical Officer Yes ----

PHC PADAL

1. NHM Cash book not

updated from sep 18

2.procedding of ec meeting

incomplete

3-Audit compliance pending

for 18-19 Q1 Q2 and 17-18

statutory audit

Mr. D.M.Vategave

Block Accountant -

15/12/2018

instruct Jr clerk to to

complete all record time

to time with help of block

accountant and made

compliance of all

pending audit paras

Facility - Medical Officer Yes ----

District Kolhapur- THO Panhala

District Kolhapur- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC BAJAR BHOGAON

1. NHM Cash book not

updated from sep 18

2.procedding of ec meeting

incomplete

3-Audit compliance pending

for 18-19 Q1 Q2 and 17-18

statutory audit

Mr. D.M.Vategave

Block Accountant -

19/12/2018

instruct Jr clerk to to

complete all record time

to time with help of block

accountant and made

compliance of all

pending audit paras

Facility - Medical Officer Yes ----

PHC PADAL

1.All NHM record is

completed till date

2.procedding of ec meeting

incomplete

3-Audit compliance pending

for 17-18 Q4

Mr. D.M.Vategave

Block Accountant -

26/12/2018

instruct Jr clerk to to

complete all record time

to time with help of block

accountant

Facility - Medical Officer Yes ----

PHC Tarale

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye THO

RADHNAGARI

01/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW at

facility level

3. Given instruction to

complete target of all

programmes

4. Given instruction to

improve RNTCP work

5. given instruction about

FP Camp

Taluka Health Officer Yes -----

PHC Rashiwade Phc

Thikpurli

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 04/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW at

facility level

3. Given instruction to

complete target of all

programmes

4. Given instruction to

improve RNTCP work

Taluka Health Officer Yes -----

District Kolhapur- THO Radhagari

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Sarwade sc Aini

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO5/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC Walwa Sc Turambe

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 6/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC Dhamod SC kote

Konoli

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 11/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC Rashiwade Phc

Thikpurli

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 13/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Tarale SC Gudal

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 15/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC Dhamod SC Dhamod

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 18/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC sarwade sc

Narthvade

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 20/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC Tarale

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 22/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Walwa Mangoli

1. Taking review of all

programs

2. MCTS updation is good.

3. RNTCP work is not as

per target

4. Delivery point not

achieved

Dr.R.R.Shetye

THO 27/12/2018

1. Given instruction

about maintain

cleaniness & MCTS

update 2.

Given instruction about

display mobiles No of

MO, ANM, MPW

3. Given instruction to

complete target of all

programmes

4. Give JSY benefit

within seven days

5. To do 100 %

immunization

Taluka Health Officer Yes -----

PHC DhamodALL Contractual staff

payment made.Accountant12/12/2018

ALL Contractual staff

payment made.NA NA NA

PHC ThikpurliALL Contractual staff

payment made.Accountant 15/12/2018

ALL Contractual staff

payment made.NA NA NA

PHC Rashiwade Phc

Thikpurli

ALL Contractual staff

payment made.Accountant19/12/2018

ALL Contractual staff

payment made.NA NA NA

PHC TaraleALL Contractual staff

payment made.Accountant26/12/2018

ALL Contractual staff

payment made.NA NA NA

PHC KARANJFEN,

MANJARE, MOSAM

1.Instruction givan

maintain cleaniness

2.NRHM record is

incomplete. 3.MR Visit

Dr H R NIRANKARI

Sahuwadi THO

04/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,LHVYes -----

SC SAVARDE DHU.

1.Instruction givan

maintain cleaniness 2.RI

Visit 3.EC Meeting PHC

bhedasagaon

Dr H R NIRANKARI

THO 05/12/2018

instructions given for

more updation of all

records

Facility -MPW,ANM,ASHA Yes -----

PHC MANJARE

1.Instruction givan

maintain cleaniness

2.NRHM record is

incomplete.3.GC Meeting

Dr H R NIRANKARI

THO 19/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,LHV ClerkYes -----

PHC BAMBVADE

1.Instruction givan

maintain cleaniness

2.NRHM record is

incomplete. 3.MR Visit

Dr H R NIRANKARI

THO 24/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,ClerkYes -----

PHC BAMBVADE

1.Instruction givan

maintain cleaniness 2.RI

Visit 3.EC Meeting PHC

bhedasagaon

Dr H R NIRANKARI

THO 26/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,Clerk,LHV,ASHAYes -----

PHC SARUD

1.Instruction givan

maintain cleaniness

2.NRHM record is

incomplete. 3.MR Visit

Dr H R NIRANKARI

THO 29/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,LHVYes -----

District Kolhapur- Accountant

District Kolhapur- THO Sahuwadi

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC AMBA, P.NINAI

1.Instruction givan

maintain cleaniness

2.Health Camp.3.EC

Meeting

Dr H R NIRANKARI

THO 31/12/2018

instructions given for

more updation of all

records

Facility -Medical Officer &

SI,ANM,Clerk,LHV,ASHAYes -----

PHC BAMBAVADE,

KARANJFEN

1.Icomplete Record

2.NHM record is

Incomplete.

Mr. U.B. Desai

Block Accountant -

17/12/2018

1.All record is completed

2.Discus with PHC Clerk

& MO for incomplet

record.

Facility - SI, PHC Clerk,

Gatpravartak, Medical OfficerYes -----

PHC BAMBAVADE,

MAN

1.Icomplete Record

2.NHM record is

Incomplete.

3.Incomplete BRS

Mr. U.B. Desai

Block Accountant -

24/12/2018

1.All record is completed

2.Discus with PHC Clerk

& MO for incomplet

record.

Facility - SI, PHC Clerk,

Gatpravartak, Medical OfficerYes -----

PHC Takali

R4/ R5 Incomplete,

R 16 incomplete, IDSP - S -

Form not available. MCTS

pending due.workplan file

is not maintained properly.

DR.P.S.DATAR THO

SHIROL Accountant

12/12/7018

Instructtions issued Facility - RH Clerk, PHC HV,

Medical OfficerNO -----

PHC Nursingwadi

EDD- EPD Calender

not updated.

MCTS pending

due.workplan file is not

maintained properly.

DR.P.S.DATAR Block

Accountant 26/12/7018Instructtions issued

Facility - RH Clerk, PHC HV,

Medical OfficerNO -----

SDH Kavathe Mahankal DPM,12-07-2018 Facility Yes No

Chichani Ambak 12-09-2018 Facility Yes No

District Kolhapur- Accountant

District Kolhapur- Accountant

District Sangli- DPM

BSU,NBSU,Specialist

,HLL,Faber,

NBSU,Kayakalp,HLL.Faber

sindoori

Record Seen for

HLL,Faber

sindoori,instructions

given for HLL

services,specialist

logbook seen and

checked, Record Seen

for HLL,Faber

sindoori,instructions

given for HLL

services,NBSU record

seen and checked

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH ISLAMPUR, PHC

Sagav, Kokrud

Client satishfaction serve

not available,

BSU,NBSU,Specialist

,HLL,Faber, LaQshya

related IEC'S not available,

LaQshya related SOP'S not

available

14/12/18

formats are given advice

to maintained 3 months

before data, Record Seen

for HLL,Faber

sindoori,instructions

given for HLL

services,specialist

logbook seen and

checked, Record Seen

for HLL,Faber

sindoori,instructions

given for HLL

services,NBSU record

seen and checked, advice

to display, photos are

share, sop are prepared &

handover to facility

Facility level Yes No

THO Atpadi

THOKhanapur

All institutes are good in EC

entries but poor PW and

CH, also poor in updation of

services. DHIS-2 new

indicator are not filled in

good validation. Most of the

beneficiaries of JSY are

deprived from benefit.

23/12/2018

Given instructions

regarding RCH portal,

DHIS-2 new indicators

and taken overall review

of all RCH

indicators.Also given

instructions regarding

JSY that how to give a

benefit by withdrawing

A/c of beneficiaries by

variuos ways as per

guidelines of SHS.

Facility Yes No

K. Mahankal THO &

SDH

THO office cash book

checked. SDH cash book,

vouchers, Specialist register

checked. As per physical,

expenditure is not booked.

PFMS is not prepared.

DAM,07.12.18

Give instructions to book

all the expenditure as per

physical work. With CS

sir discussion, arrange

duties of OS, clerk.

Facility Yes No

RH Chinchaniwangi, SC

Ambak

RH cash book, vouchers,

checked. As per physical,

expenditure is not booked.

9.12.18

Give instructions to book

all the expenditure as per

physical work.

Facility Yes No

SDH Kavthe Mahankal DHIS 2.27 Data Not filledM & E Officer (Priyanka

Belwalkar),08-07-2018

Instructedc to fill data &

cover backlogFacility Yes No

Miraj THO OfficeDHIS 2.27 Private Data

Error15/12/2018 Instructions given Facility Yes No

THO Walwa PHC kurlapRCH Portal Low

Performing18/12/2018 Plan given to increase the status Facility Yes No

District Sangli- M&E OFFICER

District Sangli- DAM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Jat PHC walsangRCH Portal Low

Performing13//12/2018

Instructions given to

complete RCH register &

increase the status

Facility Yes No

SDH Kavathe MahankalBSU,NBSU,Specialist

,HLL,Faber

IPHS Co-ordinator,12-07-

2018

Record Seen for

HLL,Faber

sindoori,instructions

given for HLL

services,specialist

logbook seen and

checked

Facility Yes No

Chichani AmbakNBSU,Kayakalp,HLL.Faber

sindoori12-09-2018

Record Seen for

HLL,Faber

sindoori,instructions

given for HLL

services,NBSU record

seen and checked

Facility Yes No

observe presence of stray

animals within premises.

Advice to construct cattle

trapFacility level Yes No

Sop of all departments

related to NQAS not

available

advice to keep sop's are

made available on mailFacility level Yes No

IEC'S are not upto the mark instruct to prepare IEC's Facility level Yes No

observe presence of stray

animals within premises.

Advice to construct cattle

trapFacility level Yes No

Foul smell in toilets

instruction has to be

given to housekeeping

staff

Facility level Yes No

housekeeping checklist is

not displayed in phc

advice to display the

housekeeping checklist Facility level Yes No

LaQshya related IEC'S not

available

advice to display, photos

are share Facility level Yes No

LaQshya related SOP'S not

available

sop are prepared &

handover to facilityFacility level Yes No

Hand over register not

availableregister maintained Facility level Yes No

Client satishfaction serve

not available

formats are given advice

to maintained 3 months

before data

Facility level Yes No

SDH KAVATHEMAHANKAL 13/12/18

SDH ISLAMPUR 14/12/18

District Sangli- IPHS Co-ordinator

District Sangli- QA Co-ordinator

PHC Dighanchi DQAC,12-06-2018

PHC Mangale 12-12-2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

LaQshya related IEC'S not

available

advice to display, photos

are shareFacility level Yes No

LaQshya related SOP'S not

available

sop are prepared &

handover to facilityFacility level Yes No

PHC Sawalaj, Yelavi, SC

siddhewadi, Anjani DHO,03-12-2018 Facility Yes No

SC Suslad, Umadi, Sordi,

Sonayl 06-12-2018 Facility Yes No

PHC Mo. Wadgaon,

Kheradewang, SC Wangi,

Ramapur, Sonkire

11-12-2018 Facility Yes No

PHC Borgaon 13-12-2018 Facility Yes No

RH Kavathe Mahankal,

PHC Dhalgaon 14-12-2018 Facility Yes No

PHC Sankh, aasangiturk

RH Jath18-12-2018 Facility Yes No

RH Tasgaon, Sc Yogewadi 26-12-2018 Facility Yes No

THO Kadegaon, THO

Palus, RH Palus28-12-2018 Facility Yes No

PHC Borgaon Regarding RCH registers DRCHO,04-12-2018

Given instructions to fill

RCH registers. Solve

there queries regarding

RCh register.

Facility Yes No

RH Kavathe Mahankal,

PHC Dhalgaon Regarding RCH registers 05-12-2018

Given instructions to fill

RCH registers. Solve

there queries regarding

RCh register.

Facility Yes No

PHC Sankh, aasangiturk

RH Jath

HMIS, DHIS and review of

all RCH indicators07-12-2018

Discussed some issues

of DHIS-2 like monthly

reporting of family

planning cases, also of

pvt., Taken review of all

RCH indicator as per

target given to institutes.

Facility Yes No

District Sangli- DRCHO

SDH ISLAMPUR 14/12/18

District Sangli - DHO

Kayakalp visit Done,

Regarding RCH registers,

DHIS, and review of all

RCH indicators

points according to

Kayakalp

seen,cleaning,hand

washing

facility,BMW,infection

control,Discussed some

issues of DHIS-2 like

monthly reporting of

family planning cases,

also of pvt., Taken

review of all RCH

indicator as per target

given to institutes.,

Given instructions to fill

RCH registers. Solve

there queries regarding

RCh register.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Tasgaon, Sc Yogewadi 11-12-2018 Facility Yes No

THO Kadegaon, THO

Palus, RH Palus12-12-2018 Facility Yes No

PHC Chichani 14-12-2018 Facility Yes No

RH Vith, RH Tasgaon, 18-12-2018 Facility Yes No

Jath Jath, Valsang, Guddapur MO DHTC ,12-04-2018 Guddapur Fair Pre Visit

Miraj, K-Mahankal &

Jath

Bhose, Shirdhon, Nagaj,

Umadi, Jath12-06-2018

MR Vaccination

Campaign Visit

Jathjath, Bilur, Valsang,

Madgyal, Sankh, Dafalapur12-07-2018

MR Vaccination

Campaign Visit

JathDafalapur, Jath, Valsang,

Madgyal, Sankh12-11-2018

MR Vaccination

Campaign Visit

JathKumbhai, Shegaon,Banali,

Jath, Dafalapur 14/12/2018

MR Vaccination

Campaign Visit

Miraj, Tasgaon, VitaKavalapur, Tasgaon,

Manerajuri, Vita18/12/2018

MR Vaccination

Campaign Visit

K mahankal Nagaj, Dhalgaon 23/12/2018Hon. Chief Minister's

Programme

K- Mahankal, JathShirdhon, K.Mahankal,

Ranjani, Dafalapur26/12/2018

MR Vaccination

Campaign Visit.

PHC ARAG Checking Site Dy. Engineer ,03-12-2018giving instruction to

contractorFacility Yes No

Warehouse kavalapur Checking Site 06-12-2018giving instruction to

contractorFacility Yes No

SNCU,DEIC Sangli Checking Site 11-12-2018giving instruction to

contractorFacility Yes No

Rh Vita Checking Site 12-12-2018giving instruction to

contractorFacility Yes No

DVS Budhgaon Checking Site 13-12-2018giving instruction to

contractorFacility Yes No

PHC Kharsundi Checking Site 17-12-2018giving instruction to

contractorFacility Yes No

PHC Bhilawadi, Kundal Checking Site 19-12-2018giving instruction to

contractorFacility Yes No

SDH Islampur,RH Palus Checking Site 26-12-2018giving instruction to

contractorFacility Yes No

PHC Sagaon, Mangale Checking Site 28-12-2018giving instruction to

contractorFacility Yes No

PHC Borgaon,Yede. Checking SiteJr. Engineer(P.A.Khade),01-

12-2018

giving instruction to

contractorFacility Yes No

PHC NERLE/PETH Checking Site 04-12-2018giving instruction to

contractorFacility Yes No

PHC ANTRI,SHIRSHI Checking Site 05-12-2018giving instruction to

contractorFacility Yes No

PHC NERLE/PETH Checking Site 07-12-2018giving instruction to

contractorFacility Yes No

HMIS, DHIS, and review

of all RCH indicators

Discussed some issues

of DHIS-2 like monthly

reporting of family

planning cases, also of

pvt., Taken review of all

RCH indicator as per

target given to institutes.

Whole block is good in

all indicators.

District Sangli- MODHTC

District Sangli- Dy.Engineer

District Sangli- Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

UPHC Islampur,Rh Palus Checking Site 11-12-2018giving instruction to

contractorFacility Yes No

PHC Borgaon,Yede. Checking Site 12-12-2018giving instruction to

contractorFacility Yes No

PHC Kurlap,Yelur Checking Site 14-12-2018giving instruction to

contractorFacility Yes No

RH shirala,Mandoor Checking Site 18-12-2018giving instruction to

contractorFacility Yes No

PHC Bhilawadi, Kundal Checking Site 19-12-2018giving instruction to

contractorFacility Yes No

SDH Islampur,RH Palus Checking Site 26-12-2018giving instruction to

contractorFacility Yes No

PHC Sagaon, Mangale Checking Site 28-12-2018giving instruction to

contractorFacility Yes No

PHC ARAG Checking Site

Jr.

Engineer(P.A.Gaikwad),03-

12-2018

giving instruction to

contractorFacility Yes No

Warehouse kavalapur Checking Site 06-12-2018giving instruction to

contractorFacility Yes No

SNCU,DEIC Sangli Checking Site 11-12-2018giving instruction to

contractorFacility Yes No

PHC Dhalgaon Checking Site 13-12-2018giving instruction to

contractorFacility Yes No

PHC Khanderajuri Checking Site 14-12-2018giving instruction to

contractorFacility Yes No

Warehouse kavalapur Checking Site 18-12-2018giving instruction to

contractorFacility Yes No

SNCU,DEIC Sangli Checking Site 20-12-2018giving instruction to

contractorFacility Yes No

PHC ARAG Checking Site 21-12-2018giving instruction to

contractorFacility Yes No

SNCU,DEIC Sangli Checking Site 24-12-2018giving instruction to

contractorFacility Yes No

Warehouse kavalapur Checking Site 27-12-2018giving instruction to

contractorFacility Yes No

SNCU,DEIC Sangli Checking Site 28-12-2018giving instruction to

contractorFacility Yes No

PHC Atapdi Checking SiteJr. Engineer(V.A.Patil),01-

12-2018

giving instruction to

contractorFacility Yes No

PHC Chinchani Checking Site 03-12-2018giving instruction to

contractorFacility Yes No

PHC Karagani Checking Site 05-12-2018giving instruction to

contractorFacility Yes No

PHC manerajri Checking Site 06-12-2018giving instruction to

contractorFacility Yes No

PHC Chinchani Checking Site 10-12-2018giving instruction to

contractorFacility Yes No

Rh Vita Checking Site 12-12-2018giving instruction to

contractorFacility Yes No

DVS Budhgaon Checking Site 13-12-2018giving instruction to

contractorFacility Yes No

PHC Kharsundi Checking Site 17-12-2018giving instruction to

contractorFacility Yes No

Kolhapur Checking Site 20-12-2018giving instruction to

contractorFacility Yes No

DVS Budhgaon Checking Site 24-12-2018giving instruction to

contractorFacility Yes No

PHC Dinganchi Checking Site 26-12-2018giving instruction to

contractorFacility Yes No

PHC Atpadi, Kharsundi PHC Visit DCM ,03-12-2018 ……. Facility Yes No

PHC Khanapur, Yelavi PHC visit 05-12-2018 ……. Facility Yes No

PHC Manerajuri PHC Visit 06-12-2018 ……. Facility Yes No

PHC Agalgaon PHC visit 10-12-2018 ……. Facility Yes No

District Sangli- Jr.Engineer

District Sangli- Jr.Engineer

District Sangli- DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Dighanchi1) Less Dlivery, 2) Increase

the Jsy Work. THO Atpadi ,12-01-2018 Improvement PHC Level No PHC

SC Gharniki

1) Less Dlivery, 2) Increase

the Jsy Work. 3) Less RCH

Data Entr y4 ) Less

PMMVY work.

12-04-2018 Improvement SC Level No PHC

SC Nelkaranji

1) Less Dlivery, 2) Increase

the Jsy Work. 3) Less RCH

Data Entry 4 ) Less

PMMVY.

12-05-2018 Improvement SC Level No PHC

SC Dighanchi 1, 21) Less PMMVY work 2)

less JSY work12-06-2018 Improvement SC Level No PHC

PHCAtpadi

1) Less Dlivery, 2) Increase

the Jsy Work. 3)Less RCH

Data Entry. 4) Less Family

Planning Work. 5) Less

PMMVY Work.

12-07-2018 Improvement PHC Level No PHC

PHC Kargani

1) Less Dlivery, 2) Increase

the Jsy Work. 3)Less RCH

Data Entry. 4) Less

PMMVY Work. 5) Less

PPIUCD

12-10-2018 Improvement PHC Level No PHC

SC Shetfale

1) Less Dlivery, 2) Increase

the Jsy Work. 3) Less

PMMVY work .4) Less

RCH Data Entry.

13/12/2018 Improvement SC Level No PHC

SC Zare

1) Increase the Jsy

Work.2)Less RCH Data

Entry. 3) Less PMMVY

work

14/12/2018 Improvement SC Level No PHC

SC Nimbavade

1) Increase the Jsy Work.

3) Less PMMVY work .3)

Less RCH Data Entry.

17/12/2018 Improvement SC Level No PHC

PHC Kharsundi

1) Less Dlivery, 2)Less Jsy

Work. 3)Less PPIUCD 4)

Less RCH Data Entry. 5)

Less RKS Meetings.

20/12/2018 Improvement PHC Level No PHC

SC Tadavale

1) Less Dlivery, 2) Less Jsy

Work. 3) Less PMMVY 4)

Less Family Planning work.

21/12/2018 Improvement SC Level No PHC

District Sangli- THO Atpadi

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Daribdchi SC

1)MR Immunisation

Performance Poor

2)Diseares Survellance Poor

3) RCH Data Entry at

Preganent Women Child

Poor

THO Jath DR.D.G.Pawar

,12-05-2018

1) Take PTM for MR

Immunisation at School

2)Daily Diseares

Suruellance Must be

done 3)Daily Data Entery

at PW & Child must

Bedone

Block Yes No

Sankh PHC

1) FP work Poor 2)Jsy

Performance poor 3) MR

Immunisation at 9 Monthe

to 15 year is Poor

12-10-2018

1) Plan Tubetomy Camp

Weekly 2) Identity JSY

Beneficery Done Every

Villege 3)Plan MR

Session For Every

School

Block Yes No

Umadi PHC

1) FP work Poor 2)Jsy

Performance poor 3)

RNTCP Performance poor

14/12/2018

1) Plan Tubetomy Camp

Weekly 2) Identity JSY

Beneficery Done Every

Villege 3)Collect Sputum

4% at opd

Block Yes No

Sonyal SC

1) PMMVY Performance

poor 2)Jsy Performance

poor 3) RCH Data Entry at

PW/Child Poor

13/12/2018

1) Collect form at

Pmmvy from Sonyal

Lakadewadi 2)Identity

JSY Beneficery Done

Every Villege 3)Data

Entry Must Be done

Daily

Block Yes No

Utagi SC

1) PMMVY Performance

poor 2)RCH Data Entey At

PW/Child Poor 3) FP Work

poor

13/12/2018

1) Collect form at

Pmmvy from Sonyal

Lakadewadi 2)Data

Entry Must Be done

Daily

Block Yes No

PHC-Deshing

1) FP Vouchers are not

maintaned properly. 2)JSY

Voucher & Reg.not

maintaned properly.

Kavte Mahankal Block

Accountant (Vitthal

Mangure),15/12/2018

1)Given instruction to

Clerck & LHV to

maintaned FP Vouchers

properly. 2)Given

instruction to LHV to

maintained JSY Voucher

& Reg.Properly.

Facility Yes Facility

District Sangli- THO Jath

District Sangli- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC-Deshing

1) Cash Book not

update.2)JSY Register not

update

15/12/2018

Given instruction to

ANM to update Cash

book & JSY Register.

Facility Yes Facility

PHC- Ranjani

1) FP Vouchers are not

maintaned properly. 2)JSY

Voucher & Reg.not

maintaned properly.

19/12/2018

1)Given instruction to

Clerck & LHV to

maintaned FP Vouchers

properly. 2)Given

instruction to LHV to

maintained JSY Voucher

& Reg.Properly.

Facility Yes Facility

SC-Ranjani

1) Cash Book not

update.2)JSY Register not

update.

19/12/2018

Given instruction to

ANM to update Cash

book & JSY Register.

Facility Yes Facility

PHC- Agalgaon

1) FP Vouchers are not

maintaned properly. 2)JSY

Voucher & Reg.not

maintaned properly.

2712/2018

1)Given instruction to

Clerck & LHV to

maintaned FP Vouchers

properly. 2)Given

instruction to LHV to

maintained JSY Voucher

& Reg.Properly.

Facility Yes Facility

SC-Agalgaon

1) Cash Book not

update.2)JSY Register not

update.

27/12/2018

Given instruction to

ANM to update Cash

book & JSY Register.

Facility Yes Facility

AragIncomplete Cash Book

,Vouche,jsy Payment

Miraj Block Accountant

,14/12/18

Cash book complited and

Jsy Payment Made to

Beneficiary

At Facility yes NA

NandreIncomplete Cash Book ,jsy

Payment21/12/18

Cash book complited and

Jsy Payment Made to

Beneficiary

At Facility yes NA

Sc Erandoli Incomplete Cash Book and

Voucher24/12/18

Instruction given to

ANMAt Facility yes NA

K.piranIncomplete Cash Book

,Voucher and RI Payment27/12/18

Cash book,Voucher

Updated and RI Payment

Made to Employee and

Asha

At Facility yes NA

PHC - Kundal

RKS & MO Cash

book,Voucher, Log book

Not update

Accountant Palus ,

13/12/2018

Instruction given to Clerk

& LHV to update

cashbook & Voucher

Facility Yes No

PHC - BhilawadiRKS & MO Cash book&

Voucher Not update Accountant 15/12/2018

Instruction given to Clerk

to update cashbook &

Voucher

Facility Yes No

District Sangli- Accountant

District Sangli- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC yelur Phc borgoan

RCH software Not Update

delivery are not as per nhm

norm

jsy work low

THO Walw (Dr. S A

patil),12-01-2018

1) Instruction given to

LHV to do 10 deliveries

in a month 3) Instruction

given to ANM to do JSY

benefit as per target . 3)

Instruction given to LHV

to keep MCTS update.

Facility Yes No

phc kameri

RCH software Not Update

delivery are not as per nhm

norm

jsy work low12-05-2018

1) Instruction given to

LHV to do 10 deliveries

in a month 3) Instruction

given to ANM to do JSY

benefit as per target . 3)

Instruction given to LHV

to keepRCH update.

Facility Yes No

phcyedemachindra

RCH software Not Update

delivery are not as per nhm

norm

jsy work low21/12/2018

1) Instruction given to

LHV to do 10 deliveries

in a month 3) Instruction

given to ANM to do JSY

benefit as per target . 3)

Instruction given to LHV

to keep RCH update.

Facility Yes No

sc sakharale

RCH software Not Update

delivery are not as per nhm

norm

jsy work low22/12/2018

1) Instruction given to

LHV to do 10 deliveries

in a month 3) Instruction

given to ANM to do JSY

benefit as per target . 3)

Instruction given to LHV

to keep RCH update.

Facility Yes No

phc borgaon

1) MO PHC cash book

written up to 01/12/2018 2)

RKS cash book upt

o01/12/2018 3) Proceding

not complited.

Walwa Block Accountant

(Smi. Priyanka Kamble),

01/12/2018

Instruction given to

Cleark to keep all

financial record updted.

Facility Yes No

phc yelur

1) MO PHC cash book

written up to 01/12/2018 2)

RKS cash book upt o

01/12/2018 3) PPIUCD Exp

not done

12-01-2018

Instruction given to

ANM to keep all

financial record updted.

Facility Yes No

District Sangli- THO Walw

District Sangli- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC kameri

1) MO PHC cash book

written up to 05/12/2018 2)

RKS cash book upt o

05/12/2018 3) PPIUCD Exp

not done

12-05-2018

Instruction given to

ANM to keep all

financial record updted.

Facility Yes No

PHC kurlap RCH software not

updated.

Walwa Block DEO

(Smt.V.L. Kamble),

05/12/2018

1) Instruction given to

LHV to do 10 deliveries

in a month 3) Instruction

given to ANM to do JSY

benefit as per target . 3)

Instruction given to LHV

to keep RCH update.

Facility Yes No

phc yedemachindra RCH software not

updated.12-08-2018

1) Instruction given

pmmvy correction 3)

Instruction given to

ANM to do JSY benefit

as per target . 3)

Instruction given to LHV

to keep RCh update.

Facility Yes No

SC sural RCH software not

updated. 14/12/2018

1) Instruction given

pmmvy correction 3)

Instruction given to

ANM to do JSY benefit

as per target . 3)

Instruction given to LHV

to keep RCh update.

Facility Yes No

phc peth RCH software not

updated. 14/12/2018

1) Instruction given

pmmvy correction 3)

Instruction given to

ANM to do JSY benefit

as per target . 3)

Instruction given to LHV

to keep RCh update.

Facility Yes No

Phc - Kheradewangi

log book Reg is not updated

2. cash book Reg is not

update

Kadegaon Block

Accountant (Krishana

Kamble) ,12-12-2018

Instruction given to Clerk

to update log book Reg.

etc.

Block Yes No

Phc -Hingangaon Bk Sc-

wangi

log book Reg is not updated

2. cash book Reg is not

update

15-12-2018

Instruction given to Clerk

to update log book Reg.

etc.

Block Yes No

District Sangli- DEO

District Sangli- Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Phc -Mohite Wadaon

proceeding Reg is not

updated 2. cash book Reg

is not update

19-12-2018

Instruction given to Clerk

to update Ledger Reg.

etc.

Block Yes No

Phc - Kheradewangi Sub-

center -amrapur, tondoli

proceeding Reg is not

updated 2. cash book Reg

is not update

21-12-2018

Instruction given to Clerk

to update proceeding

Reg. etc.

Block Yes No

Phc -Mohite Wadaon

proceeding Reg is not

updated 2. cash book Reg

is not update

31-12-2018

Instruction given to Clerk

to update Ledger Reg.

etc.

Block Yes No

SC Valivande Visit For Kayakalp DPM- S. G. Sawant-

04/12/2018Nil Facility NO NO

THO Devgad Visit For Kayakalp DPM- S. G. Sawant-

04/12/2018Nil Facility NO NO

PHC Morgaon Visit For Kayakalp DPM- S. G. Sawant-

17/12/2018Nil Facility NO NO

PHC Bhedshi Visit For Kayakalp DPM- S. G. Sawant-

18/12/2018Nil Facility NO NO

PHC Banda Visit For Kayakalp DPM- S. G. Sawant-

18/12/2018Nil Facility NO NO

PHC Banda

1) Quotation Process Not

follow proper Guidelines

2) Voucher File not

updated.

3)Rugn Kalyan Samitee

Meeting proceeding

register is Incompleted.

DAM - A. R. Gawade

12/12/2018

1)Instruction given to

PHC Clerk completed

recored

Facility Leval No No Pending

SDH Sawantwadi

1) Equipment status 2)

Manpower avialability 3)

Delivery status 4)

Appointment of contactual

staff 5) Non working

equipment

IPHS Co. 13/12/2018 Yes Facility M.S. Yes No

SDH Kankawali

1) Equipment status 2)

Manpower avialability 3)

Delivery status 4)

Appointment of contactual

staff 5) Non working

equipment

IPHS Co. 19/12/2018 Yes Facility M.S. Yes No

District Sindhudurg - DPM

District Sindhudurg - DAM

District Sindhudurg - IPHS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Mangaon

1) Equipment status 2)

Manpower avialability 3)

Delivery status 4) Model

District Survey

IPHS Co. 24/12/2018 Yes Facility M.O. Yes No

SDH Kankawali

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 01/12/2018 Yes Facility M.S. yes no

RH Devgad

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position,RI Supervison

CS 02/12/2018 Yes Facility M.S. yes no

RH Kudal

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 03/12/2018 Yes Facility M.S. yes no

Rh Malvan

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 5/12/2018 Yes Facility M.S. yes no

RH Katta

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position,RI Supervison

CS 5/12/2018 Yes Facility M.S. yes no

SDH sawantwadi

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 9/12/2018 Yes Facility M.S. yes no

RH dodamarg

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 10/12/2018 Yes Facility M.S. yes no

District Sindhudurg - CS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Vaibhavwadi

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS12/12/2018 Yes Facility M.S. yes no

SDH Shiroda

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position

CS 14/12/2018 Yes Facility M.S. yes no

RH Vengurla

Check Hospital Ward

cleaning Services,

Equipment status, medicine

Stock, Clinical

Performance, and Staff

position MR Supervision

CS 14/12/2018 Yes Facility M.S. yes no

Rh Dodamarg

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 01/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

RH Vengurla

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 03/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

RH Vaibhavwadi

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 06/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

RH Katta

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 10/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

RH Malvan

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 12/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

District Sindhudurg - RMO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Devgad

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 13/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

SDH Kankawali

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 17/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

SDH Shiroda

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 19/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

RH Kudal

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position

RMO 24/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

SDH Sawantwadi

Check Hospital Ward

cleaning Services,

Equipment status, NHM

record, Clinical

Performance, and Staff

position, MR supervision

RMO 26/12/2018 Yes Facility ( MS & staff for fulfill gaps) Yes No

PHC Mond

1) MO quarter colour work

complete. 2) Plumbing work

complete.Junior Engineer, 05-12-

2018

Sangeli,DEIC

1) Visit of EE and Architect

about lay out and planing of

new PHC building

construction. 06-12-2018

DEIC

1) Laterite masonary work

is in progress. 06-12-2018

SDH Kankavli

1)Measurements talen for

estimate under Lakhya

progremm. 13-12-2018

SDH Kankavli

1)Measurements talen for

estimate under Lakhya

progremm. 16-12-2018

RH Devgad

1)Measurements taken for

estimate under Lakhya

progremm. 17-12-2018

District Sindhudurg - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Shirgaon

1)Colour work

measurements taken for

estimate under Ayushman

Bharat Scheme. 24-12-2018

PHC Mithabav

1)Colour work

measurements taken for

estimate under Ayushman

Bharat Scheme. 28-12-2018

PHC Elaye

1)Colour work

measurements taken for

estimate under Ayushman

Bharat Scheme. 28-12-2018

PHC Padel

1)Colour work

measurements taken for

estimate under Ayushman

Bharat Scheme. 29-12-2018

VHNSC Girode

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

Dr.R.S.Kartaskar

THO Dodamarg

01/12/2018

Giving instruction& send

Letter to MO & LHV Facility Yes No

VHNSC Bhekurli

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-01-2018

Giving instruction& send

Letter to MO & Clerk

& LHV

Facility Yes No

VHNSC Pikule

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-02-2018Giving instruction& send

Letter to MO & Clerk Facility Yes No

VHNSC Maneri

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-02-2018

Giving instruction& send

Letter to MO & Clerk

& LHV

Facility Yes No

PHC S.Bhedshi

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

12-05-2018Giving instruction& send

Letter to MO & ClerkFacility Yes No

PHC Morgaon

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

12-05-2018Giving instruction& send

Letter to MO & ClerkFacility Yes No

VHNSC Parame

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-05-2018Giving instruction& send

Letter to MO & BFFacility Yes No

VHNSC Avade

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-05-2018Giving instruction& send

Letter to MO & LHV Facility Yes No

VHNSC Ghotge

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-05-2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

District Sindhudurg - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Vhnsc Bhalaval

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-06-2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

VHNSC Konashi

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-06-2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

VHNSC Vilawade

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

12-06-2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

SC Tilari

UF fund Exp.very

low.Proceding book not

updated and MR Camp

Attend .

12-11-2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

SC Kalane

UF fund Exp.very

low.Proceding book not

updated and MR Camp

Attend .

13/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

VHNSC Kalane

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

13/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

SC Maneri

UF fund Exp.very

low.Proceding book not

updated and MR Camp

Attend .

17/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

PHC S.Bhedshi

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

19/12/2018

Giving instruction& send

Letter to MO & LHV &

Clerk

Facility Yes No

VHNSC Avade

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

19/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

VHNSC Sasoli

MR Camp Attend and

VHNSC Visti VHNSC

Exp.very Low

21/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

PHC Talkat

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

28/12/2018

Giving instruction& send

Letter to MO & LHV &

ANM

Facility Yes No

PHC Morgaon

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

H.S.Parab

Dodamarg Accontant

11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHSNC Virdi

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

District Sindhudurg - Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

VHNSC - Ugade

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Phondiye

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Ayee

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Talekhol

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Sasoli

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSS - P Punarvasan

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Ambadgaon

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHSNC Ambeli

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Kalane

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Morgaon

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

VHNSC Degave

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Maneri

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.

11/12/18

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

PHC Talkat

01) Asha Meeting Attend

02) Vhnsc exp.very low 03)

RKS Change report not

submetted to Dharmaday

Ayukt Office,Oras 11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Tambuli

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Phukeri

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Vilavade

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHSNC Talkat

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Sarmale

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Vapholi

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Zolambe

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

VHNSC Kumbral

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Asniye

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Gharpi

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Kudase

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Panturli

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHSNC Shirval

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Kolzar

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Bhekurli

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

VHNSC Konashi

01) Asha Meeting Attend

Guid for all Staff 02) Vhnsc

exp.very low 03) Not

planning for Exp.2018 19.11/12/2018

Giving instruction& send

Letter to MO & LHV

& BF

Facility Yes No

PHC S.Bhedshi

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

21/12/2018Giving instruction& send

Letter to MO & Clerk Facility Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Morgaon

Cheque Issud Register &

Advance Tracking Register

not updated.RKS Change

report not submetted to

Dharmaday Ayukt

Office,Oras

28/12/2018Giving instruction& send

Letter to MO & LHV Facility Yes No

PHC Umbarde

1) Pass book not updaed

from oct

2) cash book incomplete

3) vouchers incomplete till

the date form oct 2018

4) Noting Not made for

expenses done

5) Concurrent Audit

compliance Q 2 not made

yet. 6) cashbook Not Sign

By Authorised Person (i.e.

not signed by two

authorities each)

7) VHNSC Gratn Not

transfered

8) RKS payment made

without Block Accountant

remark

Accountant Block

Vaibhavwadi,Mr. S. S.

Kadam 27/12/2018

Give Instrunction to

PHC concern person to

complet record before

10/01/2019

facility Yes No

PHC Vaibhavwadi

1 ) cashbook Not Sign By

Authorised Person (i.e. not

signed by two authorities

each)

2) Expenses made on

vehicle repair not sent to

THO for expense book in

POL

3) Pass book not updated

4) Concurrent Audit

compliance Q 2 not made

yet. 5) RKS

payment made proceeding

book not given for

verification

Mr. S. S. Kadam

29/12/2018

Give Instrunction to

PHC concern person to

complet record before

10/01/2019

facility Yes No

DTC RatnagiriOutsourcing Data Operator

Training

DPM,Shri A.A.Chougale

04/12/2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training05-12-2018

Training given to

Outsourcing Data

Operator Block No No

DTC RatnagiriOutsourcing Data Operator

Training06-12-2018

Training given to

Outsourcing Data

Operator Block No No

District Sindhudurg - Accountant Block Vaibhavwadi

District Ratnagiri - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

DTC RatnagiriOutsourcing Data Operator

Training

DAM ,Smt Lata

Gunjawate 04/12/2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training05-12-2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training06-12-2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training

M & E Officer,Shri. Arun

S.Khadake 04/12/2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training05-12-2018

Training given to

Outsourcing Data

Operator

Block No No

DTC RatnagiriOutsourcing Data Operator

Training06-12-2018

Training given to

Outsourcing Data

Operator

Block No No

Tho Chiplun,Phc

Makhajan,SayaleVisit 28-12-2018

Given Instruction of

RCH Portal, HMIS,& All

Programmes

Block No No

RH SANGMESHWAR supervisory visit IPHS CO ORDINATOR

06-12-2018

FABER SINDOORI &

HLL WORK REVIEW Facility Yes No

RH PALI supervisory visit IPHS CO ORDINATOR

11/12/2018

VISIT AS PER CHECK

LISTFacility Yes No

RH DEVRUKH supervisory visit IPHS CO ORDINATOR

14/12/2018

FABER SINDOORI &

HLL WORK REVIEW Facility Yes No

RH LANJA supervisory visit IPHS CO ORDINATOR

26/12/2018

FABER SINDOORI &

HLL WORK REVIEW Facility Yes No

NP Zadgaon,Kirtinagar ASHA visit

District Cumulative

Mobilisor,Shri A. S.

Kambale 10/12/2018

Given Instruction to

ASHAFacility No No

DTC Ratnagiri ASHA visit 13-12-2018Given Instruction to

ASHAFacility No No

DTC Ratnagiri ASHA visit 14-12-2018Given Instruction to

ASHAFacility No No

DTC Ratnagiri ASHA visit 15-12-2018Given Instruction to

ASHAFacility No No

Tho Chiplun,Phc

MakhajanVisit 29-12-2018

Given Instruction to

BCM & Gat PrawartakFacility No No

District Ratnagiri - IPHS Co-ordinator

District Ratnagiri - DCM

District Ratnagiri - DAM

District Ratnagiri - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Panchayat Samiti

Mandangad & KhedMR Visit DHO,Dr.Aathlye 07/12/2018

Giving Instructions MR

Vaccine & MR Rubbela

Vaccine

Block No No

Tho lanja ,Z.P.School

MachalMR Visit 12-12-2018

Giving Instructions MR

Vaccine & MR Rubbela

Vaccine

Block No No

Tho Chiplun , Panchayat

Samiti ChiplunMR Visit 14-12-2018

Giving Instructions MR

Vaccine & MR Rubbela

Vaccine

Block No No

Panchayat Samiti

SangameshwarMR Visit 19-12-2018

Giving Instructions MR

Vaccine & MR Rubbela

Vaccine

Tho Khed, Tho

Chiplun,Tho Khed,Phc

Makhajan,Lote,

Adare,Sawarde

MR Visit 27-12-2018

Giving Instructions MR

Vaccine & MR Rubbela

Vaccine

Block No No

Phatak Highschool VisitADHO,Dr. M.R.Kore 04-12-

2018MR Campain Review Block No No

Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No

Secred Heart Highschool,

Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No

Zilla Parishad Purn

Prathamic Urdu

Shala,Kotawade

Visit 31-12-2018 MR Campain Review Block No No

Phatak Highschool VisitDRCHO,Dr. P.S. Thombare

04-12-2018MR Campain Review Block No No

Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No

Secred Heart Highschool,

Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No

Zilla Parishad Purn

Prathamic Urdu

Shala,Kotawade

Visit 31-12-2018 MR Campain Review Block No No

RH SANGMESHWAR supervisory visit civil Surgeon Dr.P.N.

Devkar 06/12/2018

VISIT AS PER CHECK

LISTFacility Yes No

District Ratnagiri - DHO

District Ratnagiri - ADHO

District Ratnagiri - DRCHO

District Ratnagiri - CS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH PALI supervisory visit

civil Surgeon

Dr.P.N. Devkar

11/12/2018

VISIT AS PER CHECK

LISTFacility Yes No

RH DEVRUKH supervisory visit

civil Surgeon

Dr.P.N. Devkar

14/12/2018

VISIT AS PER CHECK

LISTFacility Yes No

RH LANJA supervisory visit

Civil Surgeon

DR.P.N.DevkaR

26/12/2018

VISIT AS PER CHECK

LISTFacility

ACTION

BEING

TAKEN Facility

RH DEVRUKH

1) KAYAKALP

CHECKLIST NOT

FOLLOWED 2) BMW

RULES NOT FOLLOWED

3) CHECKLIST NOT

USED FOR RI

RMO (OR)

DR.SHERKHANE C.D. 07-

12-2018

TO FOLLOW ALL THE

RULES AND

CHECKLISTS

Facility

ACTION

BEING

TAKEN

Facility

RH PALI

1) KAYAKALP

CHECKLIST NOT

FOLLOWED 2) BMW

RULES NOT FOLLOWED

3) CHECKLIST NOT

USED FOR RI

RMO (OR)

DR.SHERKHANE

C.D.12/12/2018

TO FOLLOW ALL THE

RULES AND

CHECKLISTS

Facility

ACTION

BEING

TAKEN

Facility

RH LANJA

1) KAYAKALP

CHECKLIST NOT

FOLLOWED 2) BMW

RULES NOT FOLLOWED

3) CHECKLIST NOT

USED FOR RI

RMO (OR)

DR.SHERKHANE C.D.

21/12/2018

TO FOLLOW ALL THE

RULES AND

CHECKLISTS

Facility

ACTION

BEING

TAKEN

Facility

SDH KAMTHE

1) KAYAKALP

CHECKLIST NOT

FOLLOWED 2) BMW

RULES NOT FOLLOWED

3) CHECKLIST NOT

USED FOR RI

RMO (OR)

DR.SHERKHANE

C.D.24/12/2018

TO FOLLOW ALL THE

RULES AND

CHECKLISTS

Facility

ACTION

BEING

TAKEN

Facility

Phatak Highschool VisitMODTT,Dr. P.S. Thombare

04-12-2018MR Campain Review Block No No

Mistry Highschool Visit 11-12-2018 MR Campain Review Block No No

Secred Heart Highschool,

Phatak HighschoolVisit 14-12-2018 MR Campain Review Block No No

District Ratnagiri - RMO

District Ratnagiri - MODTT

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Zilla Parishad Purn

Prathamic Urdu

Shala,Kotawade

Visit 31-12-2018 MR Campain Review Block No No

PHC Tale Site VisitDy. Engineer ,Shri. Amit

V. Sonwane 01/12/2018

For Status of Work

CheckingFacillity Yes No

PHC Tale Site Visit 07/12/2018For Status of Work

checking with EE sirFacillity Yes No

Sindhudurg Site Visit 06-12-2018For Status of Work

checking with EE sirFacillity Yes No

PHC Kotawade, PHC

Sakharapa, Warehouse,

DEIC, PHC Burambi

Site Visit 07-12-2018For Status of Work

CheckingFacillity Yes No

PHC Tale, SDH Dapoli Site Visit 08-12-2018For Status of Work

CheckingFacillity Yes No

DEIC Site Visit 14-12-2018

For Status of Work

Checking With CEO

Madam

Facillity Yes No

PHC Sakharapa Site Visit 19-12-2018For Status of Work

Checking Facillity Yes No

PHC Kotawade Site VisitJr. Engineer,Mrs. Vijaya

Bhalekar 07/12/2018

For Status of Work

checking with EE sirFacillity Yes No

PHC PAWAS, PHC

ChanderaiSite Visit 08-12-2018

For Status of Work

CheckingFacillity Yes No

PHC Sakharapa Site Visit 09-12-2018For Status of Work

CheckingFacillity Yes No

PHC Chanderai Site Visit 11-12-2018For Status of Work

CheckingFacillity Yes No

Warehouse , DEIC Site Visit 21-12-2018For Status of Work

CheckingFacillity Yes No

PHC Sakharapa Site Visit 23-12-2018For Status of Work

CheckingFacillity Yes No

PHC Burambi Site Visit 29-12-2018For Status of Work

CheckingFacillity Yes No

PHC Devhare SC

Mhapral

1 RKS Meeting not taken

2 PMMVY Forms

incomplete

3 Unitied SC Exp Less

THO MANDANGAD,Dr

P.S.Bhavthankar THO Dt

07/12/2018

Instructions given for

take RKS Meeting, keep

upto datePMMVY Forms

and untied SC Exp Less

Facillity Yes No

District Ratnagiri - Dy.Engineer

District Ratnagiri - Jr.Engineer

District Ratnagiri - THO MANDANGAD

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Peve

SC Ambvali

SC Palwani

1 immunisation not in time

2 Delivery Less

3 FP Cases Less

Dr P.S.Bhavthankar THO

Dt 11/12/2018

Instructions given for

start immunisation in

time, increase delivery

and increase FP Cases.

Facillity Yes No

SC Velas

SC Tide

SC Dahagaon

1 medicine Stock not

sufficient

2 PMMVY Form filling

Less

3 unties SC record

incomplete

Dr P.S.Bhavthankar THO

Dt 13/12/2018

Instructions given for to

maintain

sufficinetmedicine stock

and increase PMMVY

Form filling and

complete Untied SC

record

Facillity Yes No

SC Veshvi

SC Ambdave

SC Panderi

1 DHIS2 incomplete

2 JSY beneficiary a/c not

opened

3 RCH data entry less

Dr P.S.Bhavthankar THO

Dt 15/12/2018

Instructions given for

update DHIS2, Open

bank a/c for update rch

data entry.

Facillity Yes No

SC Umroli

SC Latwan

1 SC not Clean

2 VHNSC Exp less under

SC villages

3 United SC Exp Less

Dr P.S.Bhavthankar THO

Dt 17/12/2018

Instructions given for to

Keep SC Clean, to do

VHNSC Exp under the

SC and to do Exp. Of

united SC

Facillity Yes No

SC Valoute

SC Nargoli

1 Not sufficient Medicine

Stock

2 ANC Registration Less

3 Tour Diary Not available

Dr P.S.Bhavthankar THO

Dt 19/12/2018

Instructions given for

maintain sufficient

medicine stock, increase

ANC Registration and

keep Tour diary with

you.

Facillity Yes No

SC Peve

1 PMMVY Forms Less

Filled

2 FP eligible couple list not

update

3 RCH Register incomplete

Shri pandit Bapu Kolekar

Dt 12/12/2017

Instructions given for

increase PMMVY Form

filling, uptodate FP

Eligible couple list and

update RCH Register

Facillity Yes No

SC Tide

1 medicine Stock not

sufficient

2 JSY Beneficiary less

3 unties SC record

incomplete

Shri pandit Bapu Kolekar

Dt 13/12/2017

Instructions given for to

maintain

sufficinetmedicine stock

and increase JSY

beneficiary and complete

Untied SC record

Facillity Yes No

SC Veshavi

1 Due services not updated

2 JSY beneficiary a/c not

opened

3 RCH data entry less

Shri pandit Bapu Kolekar

Dt 14/12/2017

Instructions given for

update due services,

Open bank a/c for update

rch data entry.

Facillity Yes No

SC Latwan

1 JSY Exp Less

2 due services not updated

3 AMG SC exp Less

Shri pandit bapu kolekar

Dt 15/12/2017

Instructions given for to

increase JSY cases,

update due services and

to to AMG SC exp.

Facillity Yes No

District Ratnagiri - Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kelshi, PHC Anjarle,

PHC Asud, PHC UmbarlePHC visit THO Dapoli 08/12/2018

Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Pisai, Kavadoli,

RawtoliPHC visit nd MR THO Dapoli 10/12/2018

Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Pisai OPD THO Dapoli 11/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Pisai, Shivnari,

GawtaleOPD Nd MR THO Dapoli 12/12/2018

Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Sakhaloli Visit THO Dapoli 15/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Umbarle Visit THO Dapoli 27/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

PHC Anjarle Visit THO Dapoli 29/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

Gaotale, Mahamainagar (

kalamwadi)MR

BLOCK ACCOUNTANT,

07/12/2018

Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

Pan. Kazi, PHC Asud MR THO Dapoli 11/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

Bhivbandar, Panchanadi MR THO Dapoli 14/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

Gaorai, Mathegujar MR THO Dapoli 15/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

Chandikanagar MR THO Dapoli 17/12/2018Given Instrction to HA (

M/F) , Anm & Mo Facility Yes No

District Ratnagiri - THO Dapoli

District Ratnagiri - Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Furus

PHC Record Checked 2)

JSY Voucher Check 3)

Cash book check 3) about

M.R. Campaign.

THO CHIPLUN,01-12-

2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Kondmala

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

03-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

PHC Kharawate

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

04-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Chiplun Gadre School

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

05-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept PHC

compaus clean

Block Level YES No

Rampur Bamnoli

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

06-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept PHC

compaus clean

Block Level YES No

Nindivase

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

07-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept PHC

compaus clean

Block Level YES No

Asurde, Palvan

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

10-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Sawarde, Mandaki

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

2) Lnaugurate Mandki Sub

Center.

11-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Phurus Kutare School

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

12-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Dhakmoli

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

13-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

District Ratnagiri - THO CHIPLUN

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Derwan, Durgewadi

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

14-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Shirgaon

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

15-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

SC Parshuram

SC Record Checked 2) JSY

Voucher Check 3) Cash

book check

17-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Murtavade

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

18-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Kapare

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

19-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

SC Nirhal, Tamhnmala

SC Record Checked 2) JSY

Voucher Check 3) Cash

book check

20-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

SC Margtamhane

SC Record Checked 2) JSY

Voucher Check 3) Cash

book check

21-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept PHC

compaus clean

Block Level YES No

Bamnoli (Gudhe)

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

26-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Moravane, Kalkavane

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

27-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Nivali, Vahal, Devkheraki,

Naradkheraki, Rampur

1)Attended Gobar Rubela

Satra at Kondmala and

Checked Lasikarn Regiters.

29-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kharawate

PHC Record Checked 2)

JSY Voucher Check 3)

Cash book check

31-12-2018

All Registers And

Record should be

Maintained Properly.and

shuold be keept SC

compaus clean

Block Level YES No

SC Pedhambe

SC Record Checked 2)

Family Planing Cases make

100 % 4) SC Building &

Compus Keep Clean,

Cashbook Checked

BLOCK

ACCOUNTANT,12-12-

2018

Inform to Them To

Completed All

Accpounting Registes.

Block Level YES No

SC Nirvhal

SC Record Checked 2)

Family Planing Cases make

100 % 4) SC Building &

Compus Keep Clean,

Cashbook Checked

21-12-2018

Inform to Them To

Completed All

Accpounting Registes.

Block Level YES No

SC Khershet

SC Record Checked 2)

Family Planing Cases make

100 % 4) SC Building &

Compus Keep Clean,

Cashbook Checked

24-12-2018

Inform to Them To

Completed All

Accpounting Registes.

Block Level YES No

SC Terav

JSY Record Checked 2)

Family Planing Cases make

100 % 4) SC Building &

Compus Keep Clean,

Cashbook Checked

26-12-2018

Inform to Them To

Completed All

Accpounting Registes.

Block Level YES No

PHC Kharawte

PHC Record Checked 2)

Family Planing Cases make

100 % 4) SC Building &

Compus Keep Clean,

Cashbook Checked

31-12-2018

Inform to Them To

Completed All

Accpounting Registes.

Block Level YES No

Phc Watad Phc Visit & MR CampaignTHO Ratnagiri

01/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Avishkar School, RH Pali

& Phc Hatkhamba

Phc & School Visit & MR

CampaignTHO 04/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc Pawas & Mukul

Madhav Golap School

Phc & School Visit & MR

CampaignTHO 05/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc Malgund Phc Visit & MR Campaign THO 07/12/2018Instruction given to keep

record promptlyFacility Yes Facility

Sent Thomas School

Kuvarbhav & SC Bhoke

SC & School Visit & MR

CampaignTHO 10/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

District Ratnagiri - Accountant

District Ratnagiri - THO Ratnagiri

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Navnirman School Mirjole

& Phc Khanu

Phc & School Visit & MR

CampaignTHO 11/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Podar School & Phc

Hatkhamba

Phc & School Visit & MR

CampaignTHO 13/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Secret Heart School, SC

Shirgaon

SC & School Visit & MR

CampaignTHO 14/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc Pawas & SC PurngadPhc & SC Visit & Record

CheckingTHO 15/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc Jakadevi Phc Visit & MR Campaign THO 16/12/2018Instruction given to keep

record promptlyFacility Yes Facility

MS Naik School, GGPS &

SC Kolisare

SC & School Visit & MR

CampaignTHO 17/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc WatadPhc Visit & Record

CheckingTHO 19/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phatak Highschool & Phc

Malgund

Phc & School Visit & MR

CampaignTHO 20/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

SC DhamanseSC Visit & Record

CheckingTHO 26/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc Khanu & Phc

Hatkhamba

Phc Visit & Record

CheckingTHO 28/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

SC DevudSC Visit & Record

CheckingTHO 29/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc HatkhambaPhc Visit & Record

CheckingTHO 31/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Ori, Phc Jakadevi MR CampaignAccountant

01/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Mirjole, Patilwadi,

PhansawaleMR Campaign

Accountant

03/12/2018

Instruction given to keep

record promptlyFacility Yes Facility

Phc MalgundFinancial & physical Record

Checking

Accountant

12/12/2018

Expenditure payment are

made only by PFMS &

Instruction given to keep

record promptly

Facility Yes Facility

District Ratnagiri - Accountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Phc KhanuFinancial & physical Record

Checking

Accountant

13/12/2018

Expenditure payment are

made only by PFMS &

Instruction given to keep

record promptly

Facility Yes Facility

Phc Hatkhamba &

Grampanchayat

Financial & physical Record

Checking & VHNSC

Account

Accountant

14/12/2018

Expenditure payment are

made only by PFMS &

Instruction given to keep

record promptly

Facility Yes Facility

Phc KotawadeFinancial & physical Record

Checking

Accountant

19/12/2018

Expenditure payment are

made only by PFMS &

Instruction given to keep

record promptly

Facility Yes Facility

Phc PawasFinancial & physical Record

Checking

Accountant

21/12/2018

Expenditure payment are

made only by PFMS &

Instruction given to keep

record promptly

Facility Yes Facility

SC Umarath

1.Registers incomplete

2.work plan not foundTHO GUHAGAR

01/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Hedvi

1.Registers incomplete

2.work plan not foundTHO

03/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Kolawali

1.stock book incomplete

2.Reports were not

submitted THO

07/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Chindravale

1.Registers incomplete

2.work plan not foundTHO

10/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Umarath

Ranvi School

1.Registers incomplete

2.work plan not foundTHO

11/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Abloli

1.stock book incomplete

2.Reports were not

submitted THO

13/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Abloli

1.stock book incomplete

2.Reports were not

submitted THO

14/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

District Ratnagiri - THO GUHAGAR

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Hedvi

1.Registers incomplete

2.work plan not foundTHO

17/11/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Shivane

1.Registers incomplete

2.work plan not foundTHO

18/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Kotluk & Guhagar

1.Registers incomplete

2.work plan not foundTHO

19/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Abloli

SC Velneshwar

1.stock book incomplete

2.Reports were not

submitted THO

20/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

PHC Abloli

PHC Kolawali

1.stock book incomplete

2.Reports were not

submitted THO

21/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Chindravale

1.Registers incomplete

2.Voucher incompleteAccountant

10/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

SC Shivane

1.stock book incomplete

2.Reports were not

submittedAccountant

18/12/2018

Insructions were given to

staff to complete the

registers properly

Facility Yes -

Hingoli MR Campaign VisitCPM

4.12.2018MR Campaign No

Hingoli MR Campaign VisitCPM

5.12.2018MR Campaign NO

PHC WalujVisit for land inspection for

50 Beded Hospital

EE IDW Aurangabad Circle

4/12/2018

As per instructions by

Hon'ble DD Aurangabad

Health Services

inspected the Waluj PHC

with Dy. Er. For 50

Beded Hospital.

Dist. Level by Dy. Er. Yes

SNCU Sillod

1) Excavation depth 2)

Reinforcement for Jali

Footings 3) Speed of work

at SNCU Silod.

EE IDW Aurangabad Circle

5/12/2018

Inspect the site with J.

Er. & checked the 1)

Excavtion deth 2) Jali for

footing 3) Instruction has

given about speed up of

work at SNCU Sillod

Block level by J.Er. Yes

District Ratnagiri - Accountant

Circle Aurangabad - CPM

Circle Aurangabad - Ex.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

IDW NHM Z. P. ParbhaniReview of IDW works at

IDW NHM Z. P. Parbhani

EE IDW Aurangabad Circle

6/12/2018

Review of IDW Works

MCH wing 100 beded

Hospital, PHC

Ranisawargaon, Dist.

Warehouse Parbhani.

Dist. Level by Dy. Er. Yes

Dist. Ware House

Parbhani

1) Shuttering of slab 2)

Steel for slab & beams 3)

Speed of work

EE IDW Aurangabad circle

7/12/2018

Instruction has given

about 1) Shutttering of

slab should be in line

level & vertical supports

should be in plumb 2)

Steel for slab & beams

should be consider as per

RCC desing. 3) Increase

the speed of work at Dist.

Ware House Parbhani.

Dist. Level by Dy. Er. Yes

SC Kumbhephal, SC

Kinhola

1) Door, windows at SC

Kumbephal 2)

Colouring at SC

Kumbhephal 3) Paver

blocks at SC Kinhola

EE IDW Aurangabad circle

15/12/2018

Instructions has vien

about 1) Provide the

doors & windows with

accesseries as per

specifications given in

estimeate at SC

Kumbhephal 2) Finish

the surface & fill up the

patches before colouring

at SC Kumbhephal. 3)

Block level by J.Er.

Dist. Hospital HingoliMeeting at District Hospital

Hingoli

EE IDW Aurangabad circle

20/12/2018

For meeting conducted

by Hon'ble DD Health

Services Aurangabad

PHC Qtrs Goregaon.

1) Brick works 2) Joint

between the frames & brick

works 3) Speed of work

EE IDW Aurangabad circle

21/12/2018

Insructions has given

about 1) Curing the brick

works upto the required

period. 2) fill up the

joints between the frames

& brick work by cement

mortor properly. 3)

Increse the speed of work

at PHC Qtrs Goregaon.

Block level by J.Er. Yes

IDW NHM Z. P. Hingoli Meeting with DHO HingoliEE IDW Aurangabad circle

28/12/2018

Discussed with DHO

Hingoli about Health

wellness centres for PHC

& SC

PHC Siddeshwar

1) Colouring stages 2)

Concrete covers to

inspection chambers

3) Speed of work at PHC

Siddeshwar

EE IDW Aurangabad circle

29/12/2018

Insructions has given

about 1)Prepare the

surface before colouring

2) Provide the concrete

cover to inspection

chamber 3) Increase the

speed of work at PHC

Siddeshwar

Block level by J.Er.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1) Vijaya English School

2) Kids Magic English

School

3) Kids Ideal English

School

MR Campain VISIT

Ms. S.A. Thorat

(ppp-cordinator A'bad

Circle) Date : 6/12/2018

MR Campain VISIT

1) V.E.S. kids English

School

2) Shri Vidya Mandir

School

MR Campain VISIT

Ms. S.A. Thorat

(ppp-cordinator A'bad

Circle) Date : 7/12/2018

MR Campain VISIT

1) Sent. Frances English

School MR Campain VISIT

Ms. S.A. Thorat

(ppp-cordinator A'bad

Circle) Date : 19/12/2018

MR Campain VISIT

1) Ellora English School

2) Icon English School MR Campain VISIT

Ms. S.A. Thorat

(ppp-cordinator A'bad

Circle) Date : 20/12/2018

MR Campain VISIT

PHC VERUL, PHC

DOULTABAD

RI SESSION VISIT, MR

CAMPIAN VISIT

DHO

03/12/2018Yes Facility YES FACILITY

PHC SHIDHANATH

WADGAON

PHC VISIST, PHC

CONSTRACTION VISIT

DHO

06/12/2018Yes Facility YES FACILITY

SC DHAWALAPURI, SC

SHEKATA

SUBCENTER VISIST, RI

SESSION VISIT, MR

CAMPIAN VISIT

DHO

07/12/2018Yes Facility YES FACILITY

PHC ALAND, ANDHARI,

NACHANWEL,

CHINCHOLI L,

KANJKHED

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

DHO

12/12/2018Yes Facility YES FACILITY

PHC BHENDALA, SC

WAHEGAON

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

DHO

13/12/2018Yes Facility YES FACILITY

RH BIDKINRI SESSION VISIT, MR

CAMPIAN VISIT

DHO

15/12/2018Yes Facility YES FACILITY

PHC ALAND, SC

KHAMGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

DHO

28/12/2018Yes Facility YES FACILITY

PHC

GADHEPIMPALGAON,

LADGAON, SC

MAHALGAON,

DAHEGAON

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

DRCHO

03/12/2018 Yes Facility YES Facility

RH KANNAD,

DHABEGAON,

LANGADA TANDA

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

04/12/2018 Yes Facility YES Facility

District Aurangabad - DRCHO

Circle Aurangabad - PPP Co-ordinator

District Aurangabad - DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC SHIDHANATH

WADGAON,

GANGAPUR,

WAHEGAON

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

DRCHO

05/12/2018 Yes Facility YES Facility

SC DHAWALAPURIRI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

07/12/2018 Yes Facility YES Facility

PHC SHIDHANATH

WADGAON,

MAHALGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

11/12/2018 Yes Facility YES Facility

PHC PALOD,

DONGARGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

12/12/2018 Yes Facility YES Facility

TANDA BAZAR,

BORGAON SARWANI,

WAGHERA

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

13/12/2018 Yes Facility YES Facility

PHC UNADANGAON,

SIRSALA TANDA

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

14/12/2018 Yes Facility YES Facility

NILLOD,

BABHULGAON,

GAJANAN NAGAR

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

17/12/2018 Yes Facility YES Facility

PHC AMTHANA, SC

BHARADI, BORGAON

BAZAR

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

18/12/2018 Yes Facility YES Facility

PHC UNADANGAON,

TANDA BAZAR

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

21/12/2018 Yes Facility YES Facility

SDH SILLOD,

KHAMGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

22/12/2018 Yes Facility YES Facility

SC BHARADI,

GHATNANDRA

RI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

24/12/2018 Yes Facility YES Facility

RH AJINTA, MANGRULRI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

27/12/2018 Yes Facility YES Facility

PHC PALODRI SESSION VISIT, MR

CAMPIAN VISIT

DRCHO

31/12/2018 Yes Facility YES Facility

SC BAJAJNAGAR,

SAJAPUR

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

01/12/2018

Yes Facility YES FACILITY

ZALTA FATA, SC

KHUMBHEPHAL,

ADAGAON BU

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

04/12/2018

Yes Facility YES FACILITY

PHC DOULATABAD,

MALIWADA,

SHARANAPUR

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

05/12/2018

Yes Facility YES FACILITY

PHC GOLATGAON, SC

KARMAD, SC

SHENDRA

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

06/12/2018

Yes Facility YES FACILITY

District Aurangabad - ADHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC WARUDKAZI, SC

HIRAPUR, OKHARI,

SAWANGI

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

07/12/2018

Yes Facility YES FACILITY

SC PATODA, SC

PANDHARPUR,

BAJAJNAGAR

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

10/12/2018

Yes Facility YES FACILITY

PHC SHENDURWADA,

SC GHANEGAON

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

12/12/2018

Yes Facility YES FACILITY

SC CHITTEGAON,

BALAPUR, GANDHELI,

NIPANI

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

13/12/2018

Yes Facility YES FACILITY

SC BAJAJNAGAR,

WALUJ, WADGAON

KOLATI

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

14/12/2018

Yes Facility YES FACILITY

PHC KACHANER,

CHITTEGAON,

GHARDON

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

15/12/2018

Yes Facility YES FACILITY

PHC LADSAWANGI, SC

KARMAD, SHENDRA

PHC VISIST, RI SESSION

VISIT, MR CAMPIAN

VISIT

ADHO

DR. MADGE PATIL

17/12/2018

Yes Facility YES FACILITY

BALAPUR, PARIJAT

NAGAR, CIDKO

MAHANAGAR

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

20/12/2018

Yes Facility YES FACILITY

BAJAJNAGAR, WALUJ,

PARIJATNAGAR

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

24/12/2018

Yes Facility YES FACILITY

SC KHUMBHEPHAL,

GANDHELI,

BHALGAON,

APATGAON,

CHITTEGAON,

HIRAPUR

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

26/12/2018

Yes Facility YES FACILITY

SC CHOUKA,

JATWADA, JOGWADA

RI SESSION VISIT, MR

CAMPIAN VISIT

ADHO

DR. MADGE PATIL

27/12/2018

Yes Facility YES FACILITY

SC CHITTEGAON, RH

BIDKIN, SC

GIRNERTANDA

RI SESSION VISIT, MR

CAMPIAN VISIT

SO

03/12/2018 Yes Facility YES Facility

SC BOKUDJALGAON,

PATODE WADGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

SO

06/12/2018 Yes Facility YES Facility

SC SHEKATA,

AOURANGPURA

RI SESSION VISIT, MR

CAMPIAN VISIT

SO

11/12/2018 Yes Facility YES Facility

SC PAITHANKHEDA,

BHABHALGAON,

KESAPURI

RI SESSION VISIT, MR

CAMPIAN VISIT

SO

13/12/2018Yes Facility YES Facility

PHC NILAJGAONRI SESSION VISIT, MR

CAMPIAN VISIT

SO

17/12/2018 Yes Facility YES Facility

District Aurangabad - SO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Paithan Block MR Visit, Tq. PaithanDPM

17-12-2018Yes Facility YES Facility

PUNEPIP REAPROPRATION

MEETING

DPM

28-12-2018Yes Facility YES Facility

PHC

GADHEPIMPALGAON,

LADGAON, SC

MAHALGAON,

DAHEGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

M & E

03/12/2018Yes Facility YES Facility

PHC SHIDHANATH

WADGAON,

MAHALGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

M & E

11/12/2018Yes Facility YES Facility

PHC UNDANGAON,

SIRSALA TANDA

RI SESSION VISIT, MR

CAMPIAN VISIT

M & E

14/12/2018 Yes Facility YES Facility

SDH SILLOD,

KHAMGAON

RI SESSION VISIT, MR

CAMPIAN VISIT

M & E

22/12/2018 , Yes Facility YES Facility

PUNEPIP REAPROPRATION

MEETING

M & E

28/12/2018 Yes Facility YES Facility

PHC PALODRI SESSION VISIT, MR

CAMPIAN VISIT

M & E

31/12/2018 Yes Facility YES Facility

KANNADM R Visit Khunjkheda

Madarsa DQAC ,01-12-2018 Yes Facility YES Facility

Aurangabad MR VISIT 3-Dec-18 Yes Facility YES Facility

PhulambriMR VISIT AT

PHULAMBRI MADARSA4-Dec-18 Yes Facility YES Facility

Phc Kachner Sc Turkabad MR VISIT 5-Dec-18 Yes Facility YES Facility

Khultabad MR VISIT 6-Dec-18 Yes Facility YES Facility

Phc Kachner MR VISIT 7-Dec-18 Yes Facility YES Facility

Sc Gandheli MR VISIT AT GANDHELI 8-Dec-18 Yes Facility YES Facility

Ajanta MR VISIT AT Ajanta 14-Dec-18 Yes Facility YES Facility

Waluj MR Visit at Waluj 15-Dec-18 Yes Facility YES Facility

MUMBAI NQAS Mumbai Meeting 19-Dec-18 Yes Facility YES Facility

KANNADM R Visit Khunjkheda

Madarsa 20-Dec-18 Yes Facility YES Facility

PHC Borsar MR VISIT AT Ovar 21-Dec-18 Yes Facility YES Facility

Gangapur MR VISIT AT Gangapur 27-Dec-18 Yes Facility YES Facility

District Aurangabad - DPM

District Aurangabad - M&E OFFICER

District Aurangabad - QA Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

KANNADM R Visit Khunjkheda

Madarsa 31-Dec-18 Yes Facility YES Facility

SDH Sillod

1. PFMS & Baiomatric

Attadant . 2. BookS

Account Of Keeping .

3.Purchase Fill Procesure.

Give the instucion for

Maintain Update BookS

Of Account .

Maintain File Procesure. &

JSY Benifisher Paymant

Throw PFMS.RKS Audit

Compliance To give

instruction about Concerent

& Sat Audit Compliance

Krishna M Suradkar

(BFO C.S,C.Hospital Abad

)

Yes Facility level yes

R H Ajantha

1. PFMS & Baiomatric

Attadant . 2. BookS

Account Of Keeping .

3.Purchase Fill Procesure.

Give the instucion for

Maintain Update BookS

Of Account .

Maintain File Procesure. &

JSY Benifisher Paymant

Throw PFMS.RKS Audit

Compliance To give

instruction about Concerent

& Sat Audit Compliance

Krishna M Suradkar

(BFO C.S,C.Hospital Abad

)

Yes Facility level yes

RH Soygaon

1. PFMS & Baiomatric

Attadant . 2. BookS

Account Of Keeping .

3.Purchase Fill Procesure.

Give the instucion for

Maintain Update BookS

Of Account .

Maintain File Procesure. &

JSY Benifisher Paymant

Throw PFMS.RKS Audit

Compliance To give

instruction about Concerent

& Sat Audit Compliance

Krishna M Suradkar

(BFO C.S,C.Hospital Abad

)

Yes Facility level yes

PAITHAN HU

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

EMS CO-OD.,06-12-2018 Yes Facility YES YES

District Aurangabad - BFO

District Aurangabad - Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SOYGOAN

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

07-12-2018 Yes Facility YES YES

WALUJ POLICE

STATION

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

10-12-2018 Yes Facility YES YES

KARMAD RH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

11-12-2018 Yes Facility YES YES

DEVGAON RH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

18-12-2018 Yes Facility YES YES

VAIJAPUR SDH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

19-12-2018 Yes Facility YES YES

VAIJAPUR HIGHWAY

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

19-12-2018 Yes Facility YES YES

LASUR PHC

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

20-12-2018 Yes Facility YES YES

SHOOR PHC

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

21-12-2018 Yes Facility YES YES

KHULTABAD RH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

22-12-2018 Yes Facility YES YES

BANSILAL NAGAR

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

22-12-2018 Yes Facility YES YES

SILKMILL COLONY

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

22-12-2018 Yes Facility YES YES

ALAND PHC

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

27-12-2018 Yes Facility YES YES

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

AJINTHA RH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

28-12-2018 Yes Facility YES YES

DHORKIN SC

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

29-12-2018 Yes Facility YES YES

KANNAD RH

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

31-12-2018 Yes Facility YES YES

HATNUR PHC

1) Medicine Checkup

2) Equipment Checkup

3) Consumables Checkup

31-12-2018 Yes Facility YES YES

PHC Kumbhar

pimplagaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning

DHO,Dr. V. B.

Khatgaonkar 01.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken. MR Campaign

Visit

THO/MO/ANM Yes No

PHC Tirthpuri

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning

Dr. V. B. Khatgaonkar

01.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken. MR Campaign

Visit

THO/MO/ANM Yes No

District Jalna - DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Pimparkhed

1] Taken the review of

Family Planning & no

planning of FP. 2)Given

instruction about RI

Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 4]

Staff Problem.

Dr. V. B. Khatgaonkar

01.12.2018

1]Instruction given about

100 % performance of

Family Planning and did

the Camp Planning - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff Problem.

5}taken prevension

activity for Dengu, MR

Campaign Visit

THO/MO/ANM Yes No

THO Partur

1] Block Level Probleme..

2)Given instruction about

RI Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic, PMMVY

etc. 4] Staff Problem., 5]

MR Campaign review

Meeting

Dr. V. B. Khatgaonkar

04.12.2018

1]Instruction given to

THO About micro Plan

be as per plan. - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff

Problem.5] HMIS RCH

Portal Indicators wise

reviews, 6] MR Capaign

information and review

THO/MO/ANM Yes No

PHC Watur

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning 5] MR Campaign

School Visit

Dr. V. B. Khatgaonkar

04.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken. 6]MR Campaign

School Benif. and Report

Check

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Chitali Putali

1] Taken the review of

Family Planning & no

planning of FP. 2)Given

instruction about RI

Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 4]

Staff Problem.

Dr. V. B. Khatgaonkar

04.12.2018

1]Instruction given about

100 % performance of

Family Planning and did

the Camp Planning - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff Problem.

5}taken prevension

activity for Dengu

THO/MO/ANM Yes No

PHC Ashti

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

04.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

PHC Shrishti

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

04.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Viregaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

04.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

PHC Dongaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

11.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

PHC Warud

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

11.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Khasgaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

11.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

PHC Mahora

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

11.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

SC Bharaj

1] Taken the review of

Family Planning & no

planning of FP. 2)Given

instruction about RI

Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 4]

Staff Problem.

Dr. V. B. Khatgaonkar

11.12.2018

1]Instruction given about

100 % performance of

Family Planning and did

the Camp Planning - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff Problem.

5}taken prevension

activity for Dengu

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kedarkheda

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

11.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

PHC Du Kalegaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

13.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

6]MR Campaign School

Benif. and Report Check

THO/MO/ANM Yes No

SC Gola Pangari

1] Taken the review of

Family Planning & no

planning of FP. 2)Given

instruction about RI

Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 4]

Staff Problem.

Dr. V. B. Khatgaonkar

13.12.2018

1]Instruction given about

100 % performance of

Family Planning and did

the Camp Planning - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff Problem.

5}taken prevension

activity for Dengu

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Jalna

1] Block Level Probleme..

2)Given instruction about

RI Session quality 3]Taken

review of all Health

Indicator- Specially Family

Planning Programme,

Delivery Performance at

SC, RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic, PMMVY

etc. 4] Staff Problem., 5]

MR Campaign review

Meeting, Podar School

Jalna

Dr. V. B. Khatgaonkar

13.12.2018

1]Instruction given to

THO About micro Plan

be as per plan. - 2]

Given Guidelines of RI

Session .3] Taken review

of All Health Indicator

and Taken Action. 4]

Solved the Staff

Problem.5] HMIS RCH

Portal Indicators wise

reviews, 6] MR Capaign

information and review

THO/MO/ANM Yes No

PHC Wakulni

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

15.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

PHC Shelgaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

15.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

Yunani RoshangaonYunani Dawakhana

Roshangaon Visit

Dr. V. B. Khatgaonkar

15.12.2018

Yunani Dhawakhana

Visit THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Manegaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit and All

Record Verify

Dr. V. B. Khatgaonkar

20.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list 6]

All Record Keep

Maintaned and timly

updation

THO/MO/ANM Yes No

PHC Anwa

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

22.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

PHC Jalgaaon Sapakal

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

22.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Walsawangi

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

22.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

PHC Re. Pimpalgaon

1)Given instruction about

RI Session & IRIM.

2]Taken review of all

Health Indicator- Specially

Family Planning

Programme, Delivery

Performance at PHC/SC,

RCH Web Portal, RCH

Indicator, TB, lep., Malaria

,IDSP , epidemic etc. 3]

Staff Problem. 4) Family

Planning, 5] MR Capaign

Session Visit

Dr. V. B. Khatgaonkar

22.12.2018

1] Given Guidelines of

RI Session .2] Taken

review of All Health

Indicator and Taken

Action against Poor

Performing PHC/SC.3]

Solved the Staff Problem.

4) Family Planning Camp

regularly week, 5}

Review of Sathrog

Taken., 5] MR Capaign

Session Visit and

Instruction and veryfy to

report and check list

THO/MO/ANM Yes No

RH Bhokardan

1.Urban Area Rch web

Portal performance is poor

2. MR Booth is working

slow

3. Infrastracture report is

not updated yet

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

06/12/2018

1.Urban Area Rch web

Portal performance

should be improve

2. Given feedback about

MR Campaining

3. Given Feedback about

HMIS Correction and

infrastracture report For

Year 2018-19

MS/Staff YES NO

THO Office Bhokardan

1. PHC Wise Progressive

Report is not present of MR

Campaining

2.JSY Benefit given to

Mother is very Poor.

3. RCH Web Portal Child

Registration is poor.

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

06/12/2018

1.Told to BPA compile

the PHC Wise the MR

Campaining Report

correctly in time.

2. Give JSY Benefit to

JSY Mother as soon as

possible.

3. RCH Web Portal

Child Registration should

be increase.

BNO/BPA YES NO

District Jalna - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Danapur

1.MR- Supervision

2. 4 Vaccination Booth

Visited 1] In Marathi Z.P.

Primary School Danapur-

Some Benif. Not taking

vaccination. 2] in Urdu Z.P.

Primary School Danapur-

All Benificiary parents

appose to MR

Vaccination.3] In Moriya

English School Danapur-

IEC Material not present.4]

In urdu school danapur-

presenty not 100%

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

06/12/2018

1.MR- Supervision

2.In Urdu and Marathi

Z.P. Primary School

Danapur-Called Parent

meeting in school and

given feedback about

MR then MR

Vaccination started &

Feedback given to

related staff.

MO/ Staff YES NO

PHC Pirpimpalgaon

1.MR- Supervision

2. MR Booth not present in

PHC Bilding

3. MR Progressive report

format is incomplete

4. RCH Web portal PW and

Child Entry and updation

not 100% 5] JSY

Performance is poor.

6] Validation Committee

register not present

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

7/12/2018

Given feedback about

MR Campaining, RCH

Web Portal, JSY, HMIS

Data Correction etc.MO/ Staff YES NO

PHC Rajur

1.MR- Supervision

2. MR Booth not present in

PHC Bilding

3. MR Progressive report

format is incomplete

4. RCH Web portal PW and

Child Entry and updation

not 100% 5] JSY

Performance is poor.

6] Validation Committee

register not present

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

7/12/2018

Given feedback about

MR Campaining, RCH

Web Portal, JSY, HMIS

Data Correction etc.MO/ Staff YES NO

PHC Kedarkheda

1.MR- Supervision

2. MR Booth not present in

PHC Bilding

3 MR Progressive report

format is incomplete

4. RCH Web portal PW and

Child Entry and updation

not 100% 5] JSY

Performance is poor.

6] Validation Committee

register not present

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

7/12/2018

Given feedback about

MR Campaining, RCH

Web Portal, JSY, HMIS

Data Correction etc.MO/ Staff YES NO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Office Bhokardan

1.MR- Supervision

2.MR Progressive report

format is incomplete

3] RCH Web Portal-

PW/Child Data Entry and

Updation is Poor. 4]

JSY Performance is poor.

5] HMIS Correction is

remaining yet.

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

7/12/2018

Given feedback about

MR Campaining, RCH

Web Portal, JSY, HMIS

Data Correction etc.MO/ Staff YES NO

PHC Anwa

1.MR- Supervision

2. 4 Vaccination Booth

Visited 1] In Marathi

Z.P.Secondary School

Anwa- Booth No.1 AD

Syring not cutted, AEFI Kit

not present 2] In Marathi

Z.P. Primary School Anwa-

AD Syring not cutted 3] in

Urdu Z.P. Primary School

Anwa- AD Syring not

cutted.4] In Abdul shakur

Urdu School-presenty not

100%

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

11/12/2018

Given feedback about

MR CampainingMO/ Staff YES NO

PHC Jalgoan Sapkal

1.MR- Supervision

2. MR Booth is present in

PHC Bilding

3. MR Report is not

completed on given format

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

11/12/2018

Given feedback about

MR CampainingMO/ Staff YES NO

Village Karjgaon

1.MR- Supervision- MR

Session is conducted nicely Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

11/12/2018

Given feedback about

MR CampainingMO/ Staff YES NO

PHC Hasanabad

1.MR- Supervision

2. MR Booth is present in

PHC Bilding

3. MR Report is not

completed on given format

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

18/12/2018

Given feedback about

MR CampainingMO/ Staff YES NO

Village Goshegaon

1.MR- Supervision

2. Anganwadi Session-

Vaccination form not filled

completely, date is not

correct written on form.

Sunil Tukaram Bodkhe,

DM&EO, NHM Jalna

18/12/2018

Given feedback about

MR CampainingMO/ Staff YES NO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Gola pangari Cold chain supervisionB.A.Nehete (C.C.T)

02/11/2018ILR Repair C.C.T Yes No

Health post Ramnagar

Cold chain supervisionB.A.Nehete (C.C.T)

05/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

RH Bhokardan

Cold chain supervisionB.A.Nehete (C.C.T)

06/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

DVS JALNA

Cold chain supervisionB.A.Nehete (C.C.T)

12/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc Aashti Cold chain supervisionB.A.Nehete (C.C.T)

19/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

Rh partur Cold chain supervisionB.A.Nehete (C.C.T)

19/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc satona Cold chain supervisionB.A.Nehete (C.C.T)

19/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc Hasnabad Cold chain supervisionB.A.Nehete (C.C.T)

20/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc kedarkheda Cold chain supervisionB.A.Nehete (C.C.T)

20/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc pir pimpalgaon Cold chain supervisionB.A.Nehete (C.C.T)

20/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc jamkhed Cold chain supervisionB.A.Nehete (C.C.T)

21/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc wadigodri Cold chain supervisionB.A.Nehete (C.C.T)

21/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc D pimpri Cold chain supervisionB.A.Nehete (C.C.T)

21/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc khasgaon Cold chain supervisionB.A.Nehete (C.C.T)

21/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

phc warud Cold chain supervisionB.A.Nehete (C.C.T)

22/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

RH Tembhurni Cold chain supervisionB.A.Nehete (C.C.T)

22/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

RH Jafrabad Cold chain supervisionB.A.Nehete (C.C.T)

22/11/2018

cold chain equipment

preventive maintainance C.C.T Yes No

kumbhephal new SC construction visit01/12/2018

Shri Lodhi M M (JE)Estimate Purpose SC Yes No

kumbhephal new SC construction visit03/12/2018

Shri Lodhi M M (JE)Meeting with contractor SC Yes No

kumbhephal new SC construction visit04/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit05/12/2018

Shri Lodhi M M (JE)13th finance work visit SC Yes No

kumbhephal new SC construction visit06/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit07/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit10/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

District Jalna - C.C.T

District Jalna - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

kumbhephal new SC construction visit12/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

Kinhola new SC construction visit13/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

Aurangabad laqshya estimate 14/12/2018

Shri Lodhi M M (JE)

new SC construction

visitDivision Yes No

Kinhola new SC construction visit15/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit17/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

Aurangabad laqshya estimate 18/12/2018

Shri Lodhi M M (JE)

new SC construction

visitDivision Yes No

kumbhephal new SC construction visit21/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit26/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

Kinhola new SC construction visit28/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit30/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit31/12/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

kumbhephal new SC construction visit30/11/2018

Shri Lodhi M M (JE)

new SC construction

visitSC Yes No

Tembhurni13th finance Delivery room

upgradation

01/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationRH Yes No

Ashti13th finance Delivery room

upgradation

03/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

Jalgaon sapkal13th finance Delivery room

upgradation

04/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

Satona13th finance Delivery room

upgradation

05/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

Mantha BSU site visit06/12/2018

Shri Vilas Ghodke (JE)BSU site visit RH Yes No

Satona13th finance Delivery room

upgradation

07/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

Jafrabad13th finance Delivery room

upgradation

11/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationRH Yes No

Satona13th finance Delivery room

upgradation

12/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

District Jalna - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Ashti Survey for DR upgradation13/12/2018

Shri Vilas Ghodke (JE)

Survey for DR

upgradationPHC Yes No

khasgaon13th finance Delivery room

upgradation

14/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

warud13th finance Delivery room

upgradation

15/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

khasgaon UG tank reparing18/12/2018

Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No

partur13th finance Delivery room

upgradation

19/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationRH Yes No

khasgaon UG tank reparing20/12/2018

Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No

khasgaon UG tank reparing20/12/2018

Shri Vilas Ghodke (JE)UG tank reparing PHC Yes No

mumbai PIP hard copy submission20/12/2018

Shri Vilas Ghodke (JE)

PIP hard copy

submissionMumbai Yes No

Jalgaon sapkal13th finance Delivery room

upgradation

31/12/2018

Shri Vilas Ghodke (JE)

13th finance Delivery

room upgradationPHC Yes No

State Level Meeting Cum

Workshop, at YASHDA,

Pune.

01) Detailed review given

about PMMVY .

02) Sharing Problems of fill

up form with DPC.

03) Detailed review given

about DTF& BTF Meeting.

04) Instruction given by

state about increase

beneficiaries.

Murlidhar O. Varma, Dist.

Programme Coordinator

04/12/2018

01) File putup as per

state instruction .

02) As per state

instruction contact with

BPA & BCM.

03) Followup given of

Printing of Form &

Pomplet file.

04) File putup for

seperate bank accout.

DPC Yes DISTRICT

PMMVY Monitoring, at

PHC Khasgaon &

Mohara, Block Jafrabad.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

05/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/MO Yes PHC

District Jalna - DPC

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PMMVY Monitoring, at

PHC Hasnabad.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

07/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/MO Yes PHC

Block Level BF & BCM

Meeting, at T.H.O. office,

Ghansawangi.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

12/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO

Block Level BF & BCM

Meeting, at T.H.O. office,

Partur.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

13/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO

Block Level BF & BCM

Meeting, at T.H.O. office,

Badnapur.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

19/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/BCM/BPA/MO/THO Yes PHC/THO

PMMVY Monitoring, at

PHC Khasgaon, Block

Jafrabad.

01) Introduction given

about PMMVY .

02) Sharing Problems of fill

up form with BPA.

03) Information given about

Post Office Bank Account.

04) ASHA aware about

ASHA Honorium.

Murlidhar O. Varma, Dist.

Programme Coordinator

27/12/2018

01) Guideline given

about PMMVY .

02) Review of PMMVY.

03) Information given

about Post Office Bank

Account.

04) Guideline sharing

about ASHA Honorium.

ASHA/BF/MO Yes PHC

District Jalna - RKS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Ambad, PHC

JamkhedRKS Visit RKS Co.05.12.2018

Disscuss with MO

Regarding GB and EC

Meetings and

Ecpenditure as per

guidlnes and about RKS

record keeping, and

RKSD Audit report fill

online and submit charit

y commisioner office

MO Yes NO

PHC Karla RKS Visit 11.12.2018

Disscuss with MO

Regarding GB and EC

Meetings and

Ecpenditure as per

guidlnes and about RKS

record keeping, and

RKSD Audit report fill

online and submit charit

y commisioner office

MO Yes NO

PHC Somthana RKS Visit 12.12.2018

Disscuss with MO

Regarding GB and EC

Meetings and

Ecpenditure as per

guidlnes and about RKS

record keeping, and

RKSD Audit report fill

online and submit charit

y commisioner office

MO Yes NO

THO Ambad

1)Taken the review if

ASHA Vacancy 2) Given

instruction about ASHA

performance & Incentive 3)

Prakalp Prerna review 4)

ASHA Training Information

Update In Software 5) PIP

2018-19 New Guideline

DCM, Ashwini Punewad

05/12/2018

1) Instruction given

about 100 %

performance of ASHA

Software And Paid

ASHA Incentive In time

2] Give the Prakalp

Prerna Reporting intime

3] Non-Performing

ASHA Line list Month of

April 18 to Nov 18 With

THO Sign Hard copy 5)

New Guideline

information

BCM/BF Yes No

PHC Kedarkheda, Rajur,

Pripimlgaon

1)Taken the review if

ASHA Vacancy 2) Given

instruction about ASHA

performance & Incentive 3)

Prakalp Prerna review 4)

ASHA Training Information

Update In Software 5) PIP

2018-19 New Guideline

Ashwini Punewad

07/12/2018

1) Instruction given

about 100 %

performance of ASHA

Software And Paid

ASHA Incentive In time

2] Give the Prakalp

Prerna Reporting intime

3] Non-Performing

ASHA Line list Month of

April 18 to Nov 18 With

THO Sign Hard copy 5)

New Guideline

information

BCM/BF Yes No

District Jalna - DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Karla

1)Taken the review if

ASHA Vacancy 2) Given

instruction about ASHA

performance & Incentive 3)

Prakalp Prerna review 4)

ASHA Training Information

Update In Software 5) PIP

2018-19 New Guideline

Ashwini Punewad

11.12.2018

1) Instruction given

about 100 %

performance of ASHA

Software And Paid

ASHA Incentive In time

2] Give the Prakalp

Prerna Reporting intime

3] Non-Performing

ASHA Line list Month of

April 18 to Nov 18

With THO Sign Hard

copy 5) New Guideline

information

BCM/BF Yes No

PHC Shelgaon

1)Taken the review if

ASHA Vacancy 2) Given

instruction about ASHA

performance & Incentive 3)

Prakalp Prerna review 4)

ASHA Training Information

Update In Software

Ashwini Punewad

12.12.2018

1) Instruction given

about 100 %

performance of ASHA

Software And Paid

ASHA Incentive In time

2] Give the Prakalp

Prerna Reporting intime

3] Non-Performing

ASHA Line list Month of

April 18 to Nov 18 With

THO Sign Hard copy 5)

New Guideline

information

BCM/BF Yes No

PHC SEWALI

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 04-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

PHC VIREAON

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 06-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC UTWAD

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 13-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC PACHANWADGAON

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 17-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

District Jalna - THO Jalna

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC KARLA

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 20-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC WADIWADI

1 RCH

2 PFMS JSY list

3 Accountancy

DR.SHITAL SONI THO

JALNA 27-12-2018

1]Instruction given about

FMR code

2]Instruction given about

100 % performance RCH

3] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

PHC SEWALI1 RCH

2 PFMS JSY list

Shri S S BHABAT

Program Asst 04-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

PHC VIREAON1 RCH

2 PFMS JSY list

Shri S S BHABAT

Program Asst 06-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC UTWAD1 RCH

2 PFMS JSY list

Shri S S BHABAT Program

Asst 13-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC PACHANWADGAON1 RCH

2 PFMS JSY list

Shri S S BHABAT

Program Asst 17-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC KARLA1 RCH

2 PFMS JSY list

Shri S S BHABAT

Program Asst 20-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

SC WADIWADI1 RCH

2 PFMS JSY list

Shri S S BHABAT

Program Asst 27-12-2018

1]Instruction given about

100 % performance RCH

2] Instruction given

about quality JSY list for

PFMS.

MO/HA/LHV/ANM/MPW Yes No

District Jalna - Program Asst.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RASHTRAMATA

INDIRA GHANDHI

SCHOOL,JALNA

RKSK and WIFS VISIT

MAYA ARVIND SUTAR

RKSK COUNSELOR

08/12/2018

PHYSICAL

CHANGES,DIET,ANE

MIA,MAITRI CLINIC

INFORMATION

Head Master YES No

JES COLLAGE,JALNA RKSK and WIFS VISIT

MAYA ARVIND SUTAR

RKSK COUNSELOR

19/12/2018

PHYSICAL

CHANGES,DIET,ANE

MIA,MAITRI CLINIC

INFORMATION

Principal YES No

SDH AMBAD RKSK and WIFS VISIT

MAYA ARVIND SUTAR

RKSK COUNSELOR

22/12/2018

Monthly visit MS/ RKSK Counselor YES No

RH NER RKSK and WIFS VISIT

MAYA ARVIND SUTAR

RKSK COUNSELOR

27/12/2018

Monthly visit MS/ RKSK Counselor YES No

RH TEMBHURNI RKSK and WIFS VISIT

MAYA ARVIND SUTAR

RKSK COUNSELOR

28/12/2018

Monthly visit MS/ RKSK Counselor YES No

Anganwadi Visit RBSK Co.04.12.2018

Give Instruction about

health check up & refer

student to deic

MS/ RKBSK Team YES No

SDH .Ambadreviwe meeting is arrenged

AT SDH Ambad18.12.2018

Give Instruction about

health check up & refer

student to deic

MS/ RKBSK Team YES No

R.H.Manthareviwe meeting is arrenged

AT RH Mantha20.12.2018

Give Instruction about

health check up & refer

student to deic

MS/ RKBSK Team YES No

RH Temburni

reviwe meeting & AWC

Visit is arrenged AT RH

Tembhurni

26.12.2018

Give Instruction about

health check up & refer

student to deic

MS/ RKBSK Team YES No

R.H.PARTURreviwe meeting is arrenged

of PARTUR mo 28.12.2018

Give Instruction about

health check up & refer

student to deic

MS/ RKBSK Team YES No

SFWB PuneNHM PIP 2018-19 Re-

appropriation meeting

Mr Pawan A Wadkar CPM

NHM Latur Circle

28/12/2018

NHM PIP 2018-19 Re-

appropriation meetingFacility Level Yes No

NUHM Nanded Regarding MR Campaign

visit

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

01/12/2018

Regarding MR

Campaign visitFacility Level Yes No

District Jalna - RKSK Co.

District Jalna - RBSK Co.

Circle Latur - CPM

Circle Latur - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Block Tulajapur Dist

Osmanabad

Regarding MR Campaign

visit

1) ZP Primary School

Ramdayani 2) ZP Primary

School Jawalga M 3 ) THO

Office Tuljapur

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

06/12/2018

Regarding MR

Campaign visit

1) ZP Primary School

Ramdayani 2) ZP

Primary School Jawalga

M 3 ) THO Office

Tuljapur

Facility Level Yes No

NHM Beed Block Patoda

Block Ashti

Regarding MR Campaign

visit

1) ZP Primary School

Pimpalgaon Dhas 2) ZP

High School Satola 3 )

NHM Beed

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

07/12/2018

Regarding MR

Campaign visit

1) ZP Primary School

Pimpalgaon Dhas 2) ZP

High School Satola 3 )

NHM Beed

Facility Level Yes No

DH Nanded & NHM

Nanded

Regarding MR Campaign

visit

1) DH Nanded 2) NHM

Nanded

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

20/12/2018

Regarding MR

Campaign visit

1) DH Nanded 2) NHM

Nanded

Facility Level Yes No

NUHM Nanded Regarding MR Campaign

visit

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

21/12/2018

Regarding MR

Campaign visitFacility Level Yes No

HFWTC AurangabadHealth wellness Clinic VC

Attend

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

24/12/2018

Health wellness Clinic

VC AttendFacility Level Yes No

NHM Beed

1.Regarding MR Campaign

visit

2.PMMVY Review

3. HMIS & RCH poratl

Review

Mr Sandip S Yadav

CM&EO NHM Latur

Circle

29/12/2018

1.Regarding MR

Campaign visit

2.PMMVY Review

3. HMIS & RCH poratl

Review

Facility Level Yes No

1) Brickwork of super

Structure of Maherghar in

Progress.

2) Steel cutting of Lintel in

Progress.

3) Curing in progress.

RH Dharmabad Dist

Nanded

Visit to new construction of

Staff Quarters at RH

Dharmabad Dist. Nanded.

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Visit to new construction

of Staff Quarters at RH

Dharmabad Dist.

Nanded.

IDW Staff Z.P.

Nanded

Circle Latur - Ex.Engineer

PHC Lohagaon Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1) Brickwork of Plinth of

Staff Quarters in Progress.

2) Steel cutting of Ground

Floor slab in Progress.

3) Curing in progress.

1) Compaction of Murum

for plinth in Progress.

2) Steel binding for PCC at

plinth in progress.

3) Curing in progress.

1) Concreting of plinth

Beam Maherghar in

Progress.

2) Steel cutting of column

in Progress.

3) Curing in progress.

1) Brickwork of Plinth of

Staff Quarters in Progress.

2) Concreting of Ground

Floor slab in Progress.

3) Curing in progress.

PHC Sirajkhod Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 14/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

PHC Karkheli Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

SC Rajapur Dist. Nanded

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

PHC Sirajkhod Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

RH Dharmabad Dist

Nanded

Visit to new construction of

Staff Quarters at RH

Dharmabad Dist. Nanded.

Mr. Khade N.P., Executive

Engineer

Dt 04/12/2018

Visit to new construction

of Staff Quarters at RH

Dharmabad Dist.

Nanded.

IDW Staff Z.P.

Nanded

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1) Brickwork of super

Structure above Lintel level

of Maherghar in Progress.

2) Steel cutting of slab in

Progress.

3) Curing in progress.

1) Brickwork of Maherghar

in Progress.

2) Steel cutting in Progress.

3) Curing in progress.

1) Brickwork of SC in

Progress.

2) Plastering of SC in

Progress.

3) Curing in progress.

1) Finishing work of SC in

Progress.

2) Name plate of SC in

Progress.

3) Curing in progress.

SC Shemboli Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 14/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

SC Dudhad Dist. Nanded

Mr. Khade N.P., Executive

Engineer

Dt 14/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

PHC Sarsam Dist. Nanded

Mr. Khade N.P., Executive

Engineer

Dt 14/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

PHC Lohagaon Dist.

Nanded

Mr. Khade N.P., Executive

Engineer

Dt 14/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

1) Brickwork of compound

wall in Progress.

2) Steel Binding of slab of

Staff Quarters in Progress.

3) Curing in progress.

1) Excavation of footing of

Staff Quarters in Progress.

2) PCC of footing of Staff

Quarters in Progress.

3) Curing in progress.

Nilanga BlockDr G G Parge, Dist Health

Officer, Latur 02/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Ausa BlockDr G G Parge, Dist Health

Officer, Latur 04/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Ahmedpur BlockDr G G Parge, Dist Health

Officer, Latur 08/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Renapur BlockDr G G Parge, Dist Health

Officer, Latur 13/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Deoni BlockDr G G Parge, Dist Health

Officer, Latur 15/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Nilanga & Deoni BlockDr G G Parge, Dist Health

Officer, Latur 16/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Chakur BlockDr G G Parge, Dist Health

Officer, Latur 17/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Udgir BlockDr G G Parge, Dist Health

Officer, Latur 18/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

District Latur - DHO

PHC Yermala Dist.

Osmanabad

Mr. Khade N.P., Executive

Engineer

Dt 15/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

PHC Terkheda Dist.

Osmanabad

Mr. Khade N.P., Executive

Engineer

Dt 15/12/2018

Necessary Instructions

Given about Maintaining

Good Quality of

Construction Works,

Taking Various Quality

Test Reports of Building

Material and

Concrete,Curring to IDW

Staff with State office

Team.

IDW Staff Z.P.

Nanded

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Jalkot BlockDr G G Parge, Dist Health

Officer, Latur 20/12/2018MR Campain Review Facility Yes Facility level

Ahmedpur BlockDr G G Parge, Dist Health

Officer, Latur 22/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Udgir BlockDr G G Parge, Dist Health

Officer, Latur 22/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

Udgir BlockDr G G Parge, Dist Health

Officer, Latur 29/12/2018

MR Campain Review,

PHC VisitFacility Yes Facility level

THO Shirur ADr Dhange C R, ADHO,

Latur 1/11/2018PHC THO Visit Facilty Yes Facility Level

PHC PangaonHemant Salunke DPM,

Latur 11/12/2018

DHIS2, RCH Portal,

Biometric & Exp ReviewFacilty Yes Facility Level

PHC Kingaon, THO

Ahmedpur

Hemant Salunke DPM,

Latur 17/12/2018

DHIS2, RCH Portal,

Biometric & Exp ReviewFacility Yes Facility level

PHC HerHemant Salunke DPM,

Latur 18/12/2018

Kayakalpa Peer

AssessmentFacility Yes Facility level

PHC BorolHemant Salunke DPM,

Latur 24/12/2018

Kayakalpa Peer

AssessmentFacility Yes Facility level

PHC PangaonHemant Salunke DPM,

Latur 11/12/2018

DHIS2, RCH Portal,

Biometric & Exp ReviewFacilty Yes Facility Level

PHC PangaonMangesh Randive DMEO,

Latur 11/12/2018

DHIS2, RCH Portal,

Biometric & Exp ReviewFacilty Yes Facility Level

HadoltiMangesh Randive DMEO,

Latur 13/12/2018

DHIS2, RCH Portal,

Biometric & Exp ReviewFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 15/12/2018MR Campain Facilty Yes Facility Level

PHC KingaonMangesh Randive DMEO,

Latur 17/12/2018MR Campain Facilty Yes Facility Level

District Latur - ADHO

District Latur - DPM

District Latur - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Udgir BlockMangesh Randive DMEO,

Latur 18/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 19/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 20/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 21/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 26/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

Ausa BlockMangesh Randive DMEO,

Latur 26/12/2018

MR Campain Review,

PHC VisitFacilty Yes Facility Level

SDH Nilanga

1.Laqushya Assesment

2.HLL and Faber Reporting

Format Discussion

3.NBSU and BSU Checking

Puja P Patil IPHS CO

04/12/2018

1.Laqushya Assesment

Done.

2.HDU Set-up

Discussion With MS sir.

3.Planning regarding

New NBSU Set-up and

Expediture under NBSU.

4.No blood Bags In BSU

Facility

PHC Borol

1.Kayakalp Assesment

2.HLL and Faber Reporting

Format Discussion

Puja P Patil IPHS CO

06/12/2018

1.Kayakalp Assesment

Done.

2.HLL and Faber

Reporting format

Facility

RH Deoni

1.Kayakalp and NQAS

Assesment

2.No Bedsheets was

available on any bed

3.BMW is not as per

Guidelines

4.Warmer not available

Puja P Patil IPHS CO

06/12/2018

1.Assesment done and

told the identified gaps.

2.Told to on duty staff

for making proper Bed

with Bedsheets.

3.Guidelines told

regardning BMW.

Facility

WH Latur

1.Kayakalp Assesment

2.Expenditure under SNCU

is Less

3.Budget requirement for

CPS.

4.HLL and Faber Reporting

Format Discussion

Puja P Patil IPHS CO

10/12/2018

1.Kayakalp Assesment

2.Discussion regardning

Expenditure under

SNCU

3.Budget requirement for

CPS.

4.HLL and Faber

Reporting Format

Discussion

Facility

District Latur - IPHS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Nalegaon

1.Kayakalp Assesment

2.HLL and Faber Reporting

Format Discussion

3.Information given about

budget for cleaning and

laundry.

Puja P Patil IPHS CO

11/12/2018

1.Kayakalp Assesment

2.HLL and Faber

Reporting Format

Discussion

3.Information given

about budget for cleaning

and laundry.

Facility

PHC Her

1.Kayakalp Assesment

2.HLL and Faber Reporting

Format Discussion

3.Information given about

budget for cleaning and

laundry.

Puja P Patil IPHS CO

11/12/2018

1.Kayakalp Assesment

2.HLL and Faber

Reporting Format

Discussion

3.Information given

about budget for cleaning

and laundry.

Facility

RH Ausa

1.Kayakalp Assesment

2.HLL and Faber Reporting

Format Discussion

3.BSU and NBSU Checking

Puja P Patil IPHS CO

15/12/2018

1.Kayakalp Assesment

2.HLL and Faber

Reporting Format

Discussion

3.No trained MO

available for BSU letter

already sent from distrcit

level for traning of MO.

Facility

PHC Lamjana

1.Kayakalp Assesment

2.HLL and Faber Reporting

Format Discussion

3.Information given about

budget for cleaning and

laundry.

Puja P Patil IPHS CO

15/12/2018

1.Kayakalp Assesment

2.HLL and Faber

Reporting Format

Discussion

3.Information given

about budget for cleaning

and laundry.

Facility

SDH Umerga and

Tuljapur

Laqushya Re Peer

Assesment

Puja P Patil IPHS CO

21/12/2018

Laqushya Re Peer

Assesment

Facility

SDH Udgir Meeting Arogya MelaPuja P Patil IPHS CO

29/12/2018Meeting Arogya Mela

Facility

PHC Nalegaon Tal

ChakurBF Review Visit

Sangita Davari 18/12/18

(DCM) ASHABF Review Visit Phc leval Yes NO

PHC Pangaon Tal

Renapur

ASHA Monthly Meeting

Attend

Sangita Davari

26/12/18(DCM) ASHA

ASHA Monthly Meeting

Attend & guidance all

attendies about New PIP

Guideline 2018-19 &

Problem Solving at Local

leval

Phc leval Yes NO

PHC Kingaon Tal

Ahamedpur

ASHA Monthly Meeting

Attend

Sangita Davari

26/12/18(DCM) ASHA

ASHA Monthly Meeting

Attend & guidance all

attendies about New PIP

Guideline 2018-19 &

Problem Solving at Local

leval

Phc leval Yes NO

Phc Hasegaon Tal AusaASHA Monthly Meeting

Attend

Sangita Davari

27/12/18(DCM) ASHA

ASHA Monthly Meeting

Attend & guidance all

attendies about New PIP

Guideline 2018-19 &

Problem Solving at Local

leval

Phc leval Yes NO

District Latur - DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Handergully7.12.2018 Kawade S.B. JE

IDW LaturSite Visit

Handergully16.12.2018 Kawade

S.B.DyE IDW LaturSite Visit

Mumbai19.12.2018 Kawade

S.B.DyE IDW LaturMeeting

Handergully, Udgir 25.12.2018 Kawade

S.B.DyE IDW LaturAyush Survey

Mumbai26.12.2018 Kawade

S.B.DyE IDW LaturMeeting

Jawalga Po, Nilanga27.12.2018 Kawade

S.B.DyE IDW LaturSite Visit

DD office12.12.2018 Gayakwad S.T.

JE IDW LaturEtender

Jawalga po18.12.2018 Gayakwad

S.T.JE IDW LaturSite Visit

DD office20.12.2018 Gayakwad

S.T.JE IDW LaturEtender

Kasarbalkunda21.12.2018 Gayakwad S.T.

JE IDW LaturHWC Survey

DD office24.12.2018 Gayakwad S.T.

JE IDW LaturEtender

DD Office3.12.2018 Waghmare

S.J.JE IDW LaturEE Office

DD Office5.12.2018 Waghmare

S.J.JE IDW LaturEE Office

WH Latur7.12.2018 Waghmare

S.J.JE IDW LaturAyush Survey

Halgara, Ambulga 21.12.2018 Waghmare

S.J.JE IDW LaturHWC Survey

DD Office24.12.2018 Waghmare

S.J.JE IDW LaturFor site insepection

Nitur27.12.2018 Waghmare

S.J.JE IDW LaturHWC Survey

Ausa14.12.2018 Patil B.D.JE

IDW LaturODF Survey

Handergully17.12.2018 Patil B.D.JE

IDW LaturFor site insepection

District Latur - Jr.Engineer

District Latur - Jr.Engineer

District Latur - Jr.Engineer

District Latur - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Handergully18.12.2018 Patil B.D.JE

IDW LaturFor site insepection

Ausa19.12.2018 Patil B.D.JE

IDW LaturODF Survey

Handergully21.12.2018 Patil B.D.JE

IDW LaturFor site insepection

Handergully24.12.2018 Patil B.D.JE

IDW LaturFor site insepection

Panchincholi27.12.2018 Patil B.D.JE

IDW LaturHWC Survey

Latur

Attended meeting regarding

MR campaign Z.P.Girls

School,MIDC,LATUR

Dr.Smita S.Wanje NOHP

11/27/2018Recommended & Agreed Facility level by Hon. C.S. yes

RH-Killari

Dental OPD(Oral Health

Screening) in RH-Killari By

Deputation Order

Dr.Smita S.Wanje NOHP

28/11/18Recommended & Agreed Facility level by M.S. yes

DHO office,Latur.Attended Aarogya samiti

baithak at Dho office

Dr.Smita S.Wanje NOHP

03/12/2018Recommended & Agreed

Facility level by president of health

committe yes

RH Renapur

Dental OPD(Oral Health

Screening) in RH-Renapur

By Deputation Order

Dr.Smita S.Wanje NOHP

05/12/2018Recommended & Agreed Facility level by M.S. yes

RH Killari

Dental OPD(Oral Health

Screening) in RH-Killari By

Deputation Order

Dr.Smita S.Wanje NOHP

12/12/2018Recommended & Agreed Facility level by M.S. yes

Latur

Enforcement squad action

against tobacco chewers at

Latur Bus stand and

Railway station by NTCP

&NOHP

Dr.Smita S.Wanje NOHP

12/14/2018 Recommended & Agreed Facility level by Hon. C.S. yes

RH Renapur

Dental OPD(Oral Health

Screening) in RH-Renapur

By Deputation Order

Dr.Smita S.Wanje NOHP

19/12/2018Recommended & Agreed Facility level by M.S. yes

Latur

Enforcement squad

action against tobacco

chewers at Latur Bus stand

and Railway station

by NTCP& NOHP

Dr.Smita S.Wanje NOHP

12/20/2018Recommended & Agreed Facility level by Hon C.S. yes

District Latur -

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Bhavan,Mumbai

Review meeting for all

dentists regarding oral

health programme in

Mumbai.

Dr.Smita S.Wanje NOHP

24/12/2018 Aarogya Recommended & Agreed

Facility level by Hon Deputy

Director Dr.y.p.Muleyyes

RH Killari

Dental OPD(Oral Health

Screening) in RH-Killari By

Deputation Order

Dr.Smita S.Wanje NOHP

26/14/2018Recommended & Agreed Facility level by M.S. yes

PHC Kashar Balkunda Rks Ec & Gb Meeting Girish Kulkarni 15.12.2018 yes Block Level yes No

PHC Kharola & Chapoli Vhnsc Bank Accouant Girish Kulkarni 26.12.2018 yes Block Level yes No

PHc Hasegeon Vhnsc Bank Accouant Girish Kulkarni 31.12.2018 yes Block Level yes No

State Level Traning At

Yashda Pune

DPC Review Meeting And

Traning

Ladekar G N 04/12/18

(DPC PMMVY)

DPC Review Meeting

And Traning State Level Yes No

Mahanagar Palika LaturMeeting At All Uphc Mo

And DEO, ANM

Ladekar G N 12/12/18

(DPC PMMVY)

Meeting At All Uphc Mo

And DEO, ANM District Level Yes No

PHC Nalegaon Tal

ChakurBF Review Visit

Ladekar G N 18/12/18

(DPC PMMVY)BF Review Visit Phc leval Yes NO

Phc Hasegaon Tal AusaASHA Monthly Meeting

Attend

Ladekar G N 27/12/18

(DPC PMMVY)

ASHA Monthly Meeting

Attend & guidance

PMMVY Programme

Phc leval Yes NO

SDH Nilanga

Quality commeetee,BMW

segrigation and disposal,,

quality record keeping

Dr Reddy DQA Cordinator

4/12/18Facility level Yes

PHC Walandi

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

5/12/18Facility level Yes

Rh Deoni

kayakalp ass done,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

6/12/18Facility level Yes

PHC Borol

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

8/12/18Facility level Yes

District Latur - DPC

District Latur - QA Co-ordinator

District Latur -

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

WH Latur

Laqshya commeetee,BMW

segrigation and disposal,,

quality record keeping

Dr Reddy DQA Cordinator

10/10/18Facility level Yes

PHC NALEGAW

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

12/12/18Facility level Yes

PHC HER

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

11/12/18Facility level Yes

PHC Lamjana

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

14/12/18Facility level Yes

Rh Murud

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

15/12/18Facility level Yes

SDH UDGIR

BMW segrigation and

disposal, Record keeping,

clinliness,Labeling of

medicine in pharmacy store,

Hearbal garden

development

Dr Reddy DQA Cordinator

24/12/18Facility level Yes

THO Kallamb

1) NHM Expenditure

Review

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 01/12/2018

Instruction given to MO

& StaffTHO Yes No

SC Wadgaon Si

1) Cleanliness Inside &

Outside SC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 1/12/2018

Instruction given to MO

& StaffMO Yes No

District Osmanabad- DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Pargaon

1) Cleanliness Inside &

Outside PHC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 04/12/2018

Instruction given to MO

& StaffMO Yes No

Asta Kasar,

1) Cleanliness Inside &

Outside SC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 10/12/2018

Instruction given to MO

& StaffMO Yes No

THO Omerga

1) NHM Expenditure

Review

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 10/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Andur

1) Cleanliness Inside &

Outside PHC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 17/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Itkur

1) Cleanliness Inside &

Outside PHC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 19/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Samudrwani

1) Cleanliness Inside &

Outside PHC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 20/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Kond

1) Cleanliness Inside &

Outside PHC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 20/12/2018

Instruction given to MO

& StaffMO Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Dautpur

1) Cleanliness Inside &

Outside SC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 24/12/2018

Instruction given to MO

& StaffMO Yes No

SC Ter

1) Cleanliness Inside &

Outside SC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 24/12/2018

Instruction given to MO

& StaffMO Yes No

THO Kallamb

1) NHM Expenditure

Review

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 25/12/2018

Instruction given to MO

& StaffTHO Yes No

SC Naigaon

1) Cleanliness Inside &

Outside SC

2) Insrutucting given

Regarding incresing Niti

Ayog Indicator & Institute

diliveries

3) RCH Portal Updation

Dr. H.V.Wadgave

( DHO ,osmanabad )

Dt. 25/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Pohaner

1) Verification Niti Ayog

Indicator

2) Insrutucting given

Regarding HMIS data

Quality & DHIS reporting

validation

3) RCH Portal Updation

Shri.K.C.Tandle

(Dist.M&E Officer) Date-

05/12/2018

Instruction given to MO

& StaffMO Yes No

PHC Yedshi

1) Verification Niti Ayog

Indicator

2) Insrutucting given

Regarding HMIS data

Quality & DHIS reporting

validation

3) RCH Portal Updation

Shri.K.C.Tandle

(Dist.M&E Officer) Date-

06/12/2018

Instruction given to MO

& StaffMO Yes No

Yermala-Terkhedayermal phc main bldg.

dismantling started

Mr. Madhukar Deshmukh

(JE) 05/12/2018

Instruction given to MO

& StaffMO Yes no

District Osmanabad- M&E OFFICER

District Osmanabad- Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

mangrul- dahiphal- washimangrul phc measurment,

washi h for survey

Mr. Madhukar Deshmukh

(JE 06/12/2018

Instruction given to MO

& StaffMO Yes no

Yermala PHCto give Marrkout Of Type II

Qtr

Mr. Madhukar Deshmukh

(JE 10/12/2018

Instruction given to MO

& StaffMO Yes no

Terkheda PHCTo see if encroachment is

removed or not

Mr. Madhukar Deshmukh

(JE 11/12/2018

Instruction given to MO

& StaffMO Yes No

Terkheda PHCPresent at work to remove

encroachment

Mr. Madhukar Deshmukh

(JE12/12/2018

Instruction given to MO

& StaffMO Yes No

Yermala PHCto give Marrkout Of main

bldg

Mr. Madhukar Deshmukh

(JE 13/12/2018

Instruction given to MO

& StaffMO Yes No

yermal- terkheda

yrmala phc excavation in

progress & slab steel of

terkeda

Mr. Madhukar Deshmukh

(JE 15/12/2018

Instruction given to MO

& StaffMO Yes No

Terkheda PHCpresent at site terkheda phc

for slab casting

Mr. Madhukar Deshmukh

(JE 17/12/2018

Instruction given to MO

& StaffMO Yes No

Terkheda PHCpresent at site terkheda phc

for slab casting

Mr. Madhukar Deshmukh

(JE18/12/2018

Instruction given to MO

& StaffMO Yes No

Yermala PHC Site Visit Mr. Madhukar Deshmukh

(JE 19/12/2018

Instruction given to MO

& StaffMO Yes No

kond phc

visit with DHO Sir to

completed construction of

phc

Mr. Madhukar Deshmukh

(JE 20/12/2018

Instruction given to MO

& StaffMO Yes No

moha-dahiphal-Itkur-

bhoom-jawala-walwad-

Anala-Shelgaon-Assu

to survey HWC PHC for

faced branding esimate with

Jr.Enng Mr. Waghmare

Mr. Madhukar Deshmukh

(JE 26/12/2018

Instruction given to MO

& StaffMO Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Kanegaon- lohara- makni-

Jewali- Andur- Katgaon-

Sawargaon

to survey HWC PHC for

faced branding esimate with

Jr.Enng Mr. Waghmare

Mr. Madhukar Deshmukh

(JE 27/12/2018

Instruction given to MO

& StaffMO Yes No

Lohara THO, Tuljapur

1.PMMY target completion

suggections given

2. PMMYbeneficiary

should not be missed from

benefit of scheme 3. 2nd &

3 rd Instalment Due And so

Pendency should not be at

tulaka level .

Atul S.Poul (PMMVY

NHM ) Dt 10/12/2018

Instuction given to Hon

.THO & MO & PHC

staff

THO Level by PHC, MO. Yes No

Bhoom THO,

.1.PMMVY target

completion suggections

given 2. PMMVY

beneficiary should not be

missed from benefit of

scheme 3. sukanu semiti

meeting should conducted

on monthly basis & report

to District office .4. 2nd & 3

rd Instalment Due And so

Pendency should not be at

tulaka level .

Atul S.Poul (PMMVY

NHM ) Dt 12/12/2018

instuction given to

Hon.THO, MO, PHC

staff

THO Level by PHC, MO Yes No

Washi THO,

1. 2nd & 3 rd Instalment

Due And so Pendency

should not be at tulaka level

2.. PMMVYbeneficiary

should not be missed from

benefit of scheme

3..PMMVY target

completion suggections

given. .4.sukanu semiti

meeting should conducted

on monthly basis & report

to District office.

Atul S.Poul (PMMVY

NHM ) Dt 13/12/2018

instuction given toTHO

& MO Hospital staff THO Level by PHC, MO. Yes No

Kalamb THO,

1. PMMVY target

completion suggections

given 2. 2nd & 3 rd

Instalment Due And so

Pendency should not be at

tulaka level .3.sukanu

semiti meeting should

conducted on monthly basis

& report to District office.

Atul S.Poul (PMMVY

NHM ) Dt 14/12/2018

instuction given to

Hon.THO, MO, PHC

staff

THO Level by PHC, MO. Yes No

District Osmanabad- DCP

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Kalamb Pchyat Samiti,

1. PMMVYbeneficiary

should not be missed from

benefit of scheme

2..PMMVY target

completion suggections

given. .3.sukanu semiti

meeting should conducted

on monthly basis & report

to District office 4. 2nd

& 3 rd Instalment Due And

so Pendency should not be

at tulaka level. Taluka

Kalamb & Washi Block

Meeting all Taluka Staff

Instruction Givan to Pmmvy

Schemes.

Atul S.Poul (PMMVY

NHM ) Dt 25/12/2018instuction given to THO

THO Level by PHC

MO,LHV,HA,ANM &BF, . Yes No

Lohara THO,

1. PMMVY target

completion suggections

given . 2.sukanu semiti

meeting should conducted

on monthly basis & report

to District office .3. 2nd & 3

rd Instalment Due And so

Pendency should not be at

tulaka level .

Atul S.Poul (PMMVY

NHM ) Dt 28/12/2018

instuction given to

Hon.THO, MO, PHC

staff

THO Level by PHC, MO. Yes No

Lohara THO,

1. PMMVY target

completion suggections

given 2. 2nd & 3 rd

Instalment Due And so

Pendency should not be at

tulaka level .Taluka Lohara

Block Meeting Instruction

Givan to Pmmvy Schemes..

Atul S.Poul (PMMVY

NHM ) Dt 31/12/2018

instuction given to

Hon.THO,staff

THO Level by PHC, LHV,HA

ANM & BF. Yes No

Mangrul (K) PHC,

Dahiphal Phc ,& Washi

RH

.1.visited to RH washi

regarding ODF programme

activity.2.instruction given

for Gap filling 3. PHC visit

for NQAS & kayakalp

activity monitoring

Dr. S.V.Aher (DQA NHM

) Dt 06/12/2018

instuction given to MS &

Hospital staff RH Level by MS, PHC level by MO yes no

Aasu PHC & Walwad

PHC

1visit for kayakalp Final

assessment with Team

2.instruction given for Gap

filling as per kayakalp

checklist

Dr. S.V.Aher (DQA NHM

) Dt 20 /12/2018

instuction given to MO

& Hospital staff PHC level by MO yes no

District Osmanabad- QA Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Omerga SDH & Tuljapur

SDH

1. visit for kayakalp peer

assessment with DD cirlce

latur team 2.Instruction

given for Gap filling as per

kayakalp checklist

Dr. S.V.Aher (DQA NHM

) Dt 21/12/2018

instuction given to MS &

Hospital staff SDH level by MS yes no

Savargaon PHC & Jalkot

PHC

1visit for kayakalp Final

assessment with Team

2.instruction given for Gap

filling as per kayakalp

checklist

Dr. S.V.Aher (DQA NHM

) Dt 24/12/2018

instuction given to MO

& Hospital staff PHC level by MO yes no

Mangrul (K) PHC

1visit for kayakalp Final

assessment with Team

2.instruction given for Gap

filling as per kayakalp

checklist

Dr. S.V.Aher (DQA NHM

) Dt 26/12/2018

instuction given to MO

& Hospital staff PHC level by MO yes no

Keshegaon PHC

1visit for kayakalp Final

assessment with Team

2.instruction given for Gap

filling as per kayakalp

checklist

Dr. S.V.Aher (DQA NHM

) Dt 27/12/2018

instuction given to MO

& Hospital staff PHC level by MO yes no

Dahiphal PHC &

Mankeshwar PHC

1visit for kayakalp Final

assessment with Team

2.instruction given for Gap

filling as per kayakalp

checklist

Dr. S.V.Aher (DQA NHM

) Dt 28/12/2018

instuction given to MO

& Hospital staff PHC level by MO yes no

PHC ChousalaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office patoda

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC KadaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office Beed

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC UmapurPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC ChaklambaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office GeoraiTHO office meeting, visits

& Measles & Rubella

THO office meeting,

visits & Measles &

Rubella

Block/Facility Yes No

THO Office MajalgaonTHO office meeting, visits

& Measles & Rubella

THO office meeting,

visits & Measles &

Rubella

Block/Facility Yes No

District Beed - DHO

DHO Dr.

R. B. Pawar Date :-

04.12.2018

DHO Dr.

R. B. Pawar Date :-

05.12.2018

DHO Dr.

R. B. Pawar Date :-

06.12.2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC GangamaslaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC PatrudPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office Wadwani

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

THO Office ParaliHon. Gardian Minister

Meeting

Hon. Gardian Minister

MeetingBlock/Facility Yes No

PHC UjaniPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

Village mahendrawadiVisit of Mahendrawadi

about MR

Visit of Mahendrawadi

about MRBlock/Facility Yes No

Village GarmathaVisit of Garmatha about

MR

Visit of Garmatha about

MRBlock/Facility Yes No

SC Pimpalwandi SC visit SC visit Block/Facility Yes No

PHC DhamangaonPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office Georai

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

SC Doethan SC visit SC visit Block/Facility Yes No

THO Office Beed

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

THO Office WadwaniTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

PHC KuppaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC BhogalwadiPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office DharurTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

Parali

Maha Arogya Shibir at

Gopinathgad preparation

visit

DHO Dr.

R. B. Pawar Date :-

11.12.2018

Maha Arogya Shibir at

Gopinathgad preparation

visit

Block/Facility Yes No

SC Pangri SC visit

DHO Dr.

R. B. Pawar Date :-

12.12.2018

SC visit Block/Facility Yes No

THO Office BeedTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

PHC Dharmapuri

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC Ujani

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

DHO Dr.

R. B. Pawar Date :-

08.12.2018

DHO Dr.

R. B. Pawar Date :-

09.12.2018

DHO Dr.

R. B. Pawar Date :-

10.12.2018

DHO Dr.

R. B. Pawar Date :-

13.12.2018

DHO Dr.

R. B. Pawar Date :-

06.12.2018

DHO Dr.

R. B. Pawar Date :-

07.12.2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC MadalmohiPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC Nipani JawalkaPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC DhamangaonPHC Visit and Supervision

of Measles & Rubella

DHO Dr.

R. B. Pawar Date :-

15.12.2018

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

Pune Meeting at Pune Meeting at Pune Block/Facility Yes No

PHC Khunthefal

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC Amalner

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC NalwandiPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

PHC PimpalnerPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

THO Office BeedTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

PHC TakalsingPHC Visit and Supervision

of Measles & Rubella

PHC Visit and

Supervision of Measles

& Rubella

Block/Facility Yes No

SC loni SC visit SC visit Block/Facility Yes No

SC Savargaon SC visit SC visit Block/Facility Yes No

Village nandur SC visit SC visit Block/Facility Yes No

THO Office AshtiTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

THO Office kaijTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

PHC ChincholimaliPHC Visit and Review all

national programs

PHC Visit and Review

all national programsBlock/Facility Yes No

PHC yousuf wadgaonPHC Visit and Review all

national programs

PHC Visit and Review

all national programsBlock/Facility Yes No

PHC BardapurPHC Visit and Review all

national programs

DHO Dr.

R. B. Pawar Date :-

21.12.2018

PHC Visit and Review

all national programsBlock/Facility Yes No

THO Office AmbajogaiTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

PHC BhavthanaPHC Visit and Review all

national programs

PHC Visit and Review

all national programsBlock/Facility Yes No

THO Office DharurTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

DHO Dr.

R. B. Pawar Date :-

17.12.2018

DHO Dr.

R. B. Pawar Date :-

18.12.2018

DHO Dr.

R. B. Pawar Date :-

19.12.2018

DHO Dr.

R. B. Pawar Date :-

21.12.2018

DHO Dr.

R. B. Pawar Date :-

14.12.2018

DHO Dr.

R. B. Pawar Date :-

16.12.2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC DharmapuriPHC Visit and Review all

national programs

PHC Visit and Review

all national programsBlock/Facility Yes No

THO Office ParaliTHO office meeting, visits

& review MR programs

THO office meeting,

visits & review MR

programs

Block/Facility Yes No

Mumbai Meeting at Mumbai

DHO Dr.

R. B. Pawar Date :-

23.12.2018

Meeting at Mumbai Block/Facility Yes No

PHC Suleman DeolaPHC Visit and Review all

national programs

PHC Visit and Review

all national programsBlock/Facility Yes No

SC Savargaon SC visit SC visit Block/Facility Yes No

Village Dhanora SC visit SC visit Block/Facility Yes No

THO Office Parali

THO office meeting, visits

& review all national

programs & Hon. Gardian

Minister meeting

DHO Dr.

R. B. Pawar Date :-

28.12.2018

THO office meeting,

visits & review all

national programs &

Hon. Gardian Minister

meeting

Block/Facility Yes No

THO Office Shirur

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

THO Office Beed

THO office meeting, visits

& review all national

programs

THO office meeting,

visits & review all

national programs

Block/Facility Yes No

PHC Suleman DeolaPHC Visit and Review all

national programs

DHO Dr.

R. B. Pawar Date :-

30.12.2018

PHC Visit and Review

all national programsBlock/Facility Yes No

MumbaiPanchayat Raj committee

meeting at Mumbai

DHO Dr.

R. B. Pawar Date :-

31.12.2018

Panchayat Raj committee

meeting at MumbaiBlock/Facility Yes No

Bhodka Village/AW RI Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

RI Session

Hingni Village/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

MR Session

Amla Village/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

MR Session

Limla Village/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

MR Session

Koyal Village/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

MR Session

Longaon Village/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 07-12-

2018

MR Session

Wadwani Village/ AW MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

Morwad Village/AW MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

Babi Village/AW MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

Telgaon AW 1 MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

Telgaon AW 2 MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

DHO Dr.

R. B. Pawar Date :-

29.12.2018

District Beed - M&E OFFICER

DHO Dr.

R. B. Pawar Date :-

22.12.2018

DHO Dr.

R. B. Pawar Date :-

25.12.2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Telgaon AW 3/School MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

Sunder Nager Telgaon

Suger Factory MR Session

Dist. M&E Officer

L.S.Kulkarni Date- 20-12-

2018

MR Session

22. SDH Parli

IPHS Co-ordinator Smt.

Ghungrad J. B. Date :-

11/12/2018

SDH Parali Shibir

23. SDH Parli

IPHS Co-ordinator Smt.

Ghungrad J. B. Date :-

12/12/2018

SDH Parali Shibir

24. SDH Parli

IPHS Co-ordinator Smt.

Ghungrad J. B. Date :-

13/12/2018

SDH Parali Shibir

SDH Georai

vkjch,lds iFkdkapk vk<kok

o vkjksX; rikl.kh o lanHkZ

lsokpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d]Jherh t;Jh ?kaqxjM

vk;-ih-,p-,l-leUo;d o Jh

lkj.khdj ,- bZ-,e-,l-

leUo;d

fn-04-12-2018

vkjchj,lds iFkdkaP;k

eklhd vk<kok lanHkkZr

ekfgrh ?ks.;kr vkyh- lanHkZ

lsok f'kchj ?ks.;kr ;sbZy

vls lkax.;kr vkys-izR;sd

vkjch,lds P;k okgukyk

yksxks yko.;kckcr ppkZ

dj.;kr vkyh-rlsp ,e-

vkj-ylhdj.kklkBh 'kkgq

fo|ky; xsojkbZ ;sFks izR;{k

HksV nsmQu ikg.kh dj.;kr

vkyh-

District, Block, Facility Yes No

RH Majalgaon

vkjch,lds iFkdkapk vk<kok

o vkjksX; rikl.kh o lanHkZ

lsokpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-05-12-2018

vkjchj,lds iFkdkaP;k

eklhd vk<kok lanHkkZr

ekfgrh ?ks.;kr vkyh rlsp-

uksOgscj 2018 Ik;Zar lnjhy

iFkdkaps eku/ku ns.;kr

vkysys vkgsr- lnjhy

iFkdkauk ns.;kr vkysys

yWiVkWi pkaxY;k izdkjps

vkgsr- rlsp uohu vgoky

iQkWjeWV ckcr ppkZ

dj.;kr vkyh-arlsp ,e-

vkj-ylhdj.k dfjrk ,dk

iFkdkayk HksV ns.;kr vkyh-

R;kfBdk.kh MkW-ukxjxksts gs

,e-vkj- ylhdj.kklkBh

jktekrk fo|ky;kr ,e-

vkj-ylhdj.k pkyq gksrs-

District, Block, Facility Yes No

District Beed - IPHS Co-ordinator

District Beed - RBSK Co.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Dharur

vkjch,lds iFkdkapk vk<kok

o vkjksX; rikl.kh o lanHkZ

lsokpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-06-12-2018

vkjchj,lds iFkdkaP;k

eklhd vk<kok lanHkkZr

ekfgrh ?ks.;kr vkyh-

rkyqdk vkjksX; vf/kdkjh

;kaP;k lkscr tkmQu

Kkunhi fo|ky;kr ,e-vkj-

ylhdj.kkph eksBh eksghe

pkyq gksrh R;k fBdk.kh

tkmQu ppkZ dj.;kr

vkyh-

District, Block, Facility Yes No

SDH Kaij

vkjch,lds iFkdkapk vk<kok

o vkjksX; rikl.kh o lanHkZ

lsokpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] o Jh lkj.khdj ,-

bZ-,e-,l- leUo;d

fn-07-12-2018

vkjchj,lds iFkdkaP;k

eklhd vk<kok lanHkkZr

ekfgrh ?ks.;kr vkyh rlsp

uksOgsacj 18 Ik;Zar lnjhy

iFkdkaps eku/ku ns.;kr

vkysys vkgsr- oS|fd;

vf/k{kd ;kaph HksV gkmQ

'kdyh ukgh rlsp MkW-

eksjkGs ;kaps lkscr uqjtgkW

fo|ky;kr ylhdj.k pkyq

gksrs-R;kfBdk.kh tkmQu

ikg.kh dsyh vlrk R;k

'kkGsr ,dq.k 450 ykHkkFkhZ

iSfd iQdr 65

ykHkkF;kZkuhp ,e-vkj-

ylhdj.k djQu ?ksrys-

vls fun'kZkukl vkys-

District, Block, Facility Yes No

RH Chinchwan

vkjch,lds iFkdkapk vk<kok

o vkjksX; rikl.kh o lanHkZ

lsokpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-08-12-2018

ek-eq[; dk;Zdkjh vf/kdkjh

;kauh fnysY;k lqpusuqlkj

izR;sd efgU;kP;k 8

rkj[ksyk vkjch,lds ;k

dk;Zdzekph rkyqdkLrjh;

vk<kok cSBd ?ks.ks ckcr

lqpuk ns.;kr vkysY;k

gksR;k-R;kvuq"kaxkus xzkeh.k

jQX.kky;]fpapo.k ;sFks

izR;{k vk<kok cSBfdyk

mifLFkr jkgqu vk<kok o

ekxZn'kZu dj.;kr vkys-

District, Block, Facility Yes No

SDH Parli xksihukFk xM ikaxjh

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-11-12-2018

Lo-xksihukFk eqaMs ;kaP;k

ok<fnolkfuehRr egk

vkjksX; esGkO;kP;k fu;kstu

dj.;kr lkBh R;k fBdk.kh

HksV nsmQu vk<ok ?ks.;kr

vkyk-

District, Block, Facility Yes No

SDH Parli xksihukFk xM ikaxjh

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-13-12-2018

Lo-xksihukFk eqaMs ;kaP;k

ok<fnolkfuehRr egk

vkjksX; esGkO;kP;k fu;kstu

dj.;kr lkBh R;k fBdk.kh

izR;{k esGkO;k e/;s vkjksX;

rikl.kh dj.;kr vkyh-

District, Block, Facility Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH Parli vkjksX; foHkxkpk vk<kok

Jh- rkaxMs vkj-ds vkjch,lds

leUo;d] Jh lkj.khdj ,- bZ-

,e-,l- leUo;d

fn-28-12-2018

ek-ikydea_kh iadtkrkbZ

eqaMs ;kaP;k v/;{krs[kkyh

vkjksX; o f'k{k.k foHkxkpk

vk<kok ?ks.;kr vkyk-

R;ke/;s eqyhpk tUe nj

ok<ysYkk fnlqu vkyk o

bZrj o xaHkhj 'kL_kfdz;kps

izek.k ok<ysys fnlqu vkys-

rlsp cka/kdke foHkkxkpk

vk<kok ?ks.;kr vkyk

R;ke/;s uohu cka/kdke ekgs

ekpZ 2019 v[ksj iq.kZ

dj.;kr ;kos v'kkk lqpuk

ns.;kr vkY;k-

District, Block, Facility Yes No

PHC Sonkhed Taluka Loha

1. Check the record 2014 -

15 to 2016-17 RKS Mo

PHC account

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit 4.Concurrent audit not

done

Junaid Saleem,

District Program Manager

Nanded Date :-

03/12/2018

11. Check the record

2014 -15 to 2016-17

RKS Mo PHC account

2. payement of activity

has not done by PFMS.

3. compliences of

Statutory audit

4.Concurrent audit not

done

PHC Level By MO Yes No

PHC Manjaram Taluka

Naigaon

1. Check the record 2014 -

15 to 2016-17 RKS Mo

PHC account

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit 4.Concurrent audit not

done

Junaid Saleem,

District Program Manager

Nanded Date :-

26/12/2018

11. Check the record

2014 -15 to 2016-17

RKS Mo PHC account

2. payement of activity

has not done by PFMS.

3. compliences of

Statutory audit

4.Concurrent audit not

done

PHC Level By MO Yes No

PHC Manjaram Taluka

Naigaon

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit

Junaid Saleem,

District Program Manager

Nanded Date :-

28/12/2018

1. payement of activity

has not done by PFMS.

2. compliences of

Statutory audit

MMU Level By MO Yes No

PHC Sonkhed Taluka

Loha

1. Check the record 2014 -

15 to 2016-17 RKS Mo

PHC account

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit 4.Concurrent audit not

done

Mr. Chaudhari B R

DAM Nanded Date

:- 03/12/2018

11. Check the record

2014 -15 to 2016-17

RKS Mo PHC account

2. payement of activity

has not done by PFMS.

3. compliences of

Statutory audit

4.Concurrent audit not

done

PHC Level By MO Yes No

District Nanded - DPM

District Nanded - DAM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Manjaram Taluka

Naigaon

1. Check the record 2014 -

15 to 2016-17 RKS Mo

PHC account

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit 4.Concurrent audit not

done

Mr. Chaudhari B R

DAM Nanded

Date :- 26/12/2018

11. Check the record

2014 -15 to 2016-17

RKS Mo PHC account

2. payement of activity

has not done by PFMS.

3. compliences of

Statutory audit

4.Concurrent audit not

done

PHC Level By MO Yes No

MMU Umri Taluka

Umri

2. payement of activity has

not done by PFMS.

3. compliences of Statutory

audit

Mr. Chaudhari B R

DAM Nanded Date

:- 28/12/2018

1. payement of activity

has not done by PFMS.

2. compliences of

Statutory audit

MMU Level By MO Yes No

PHC Sonkhed Taluka

LohaPulse Polio Visit

Mr. Kamble A.B.

District M & E Officer

Nanded Date :-

03/12/2018

1) DHIS Validation

Commity not Conduct

every month. Instruction

given to impliment

meeting every month 2)

maintain both files for

DHIS 2 Online and hard

copy. 3) RCH Regi.

Verify and and portal

data entry 100 EC

complited before 10

Every Month

PHC Level By MO Yes No

PHC Manjaram Taluka

Naigaon

Reproductive Health/

Family Planning

Maternal Health

Newborn Health Child

Health Adolescent Health

Mr. Kamble A.B.

District M & E Officer

Nanded

Date :- 26/12/2018

1) DHIS Validation

Commity not Conduct

every month. Instruction

given to impliment

meeting every month 2)

maintain both files for

DHIS 2 Online and hard

copy. 3) RCH Regi.

Verify and and portal

data entry 100 EC

complited before 10

Every Month

PHC Level By MO Yes No

MMU Umri Taluka

Umri

Reproductive Health/

Family Planning

Maternal Health

Newborn Health Child

Health Adolescent Health

Mr. Kamble A.B.

District M & E Officer

Nanded Date :-

28/12/2018

1) DHIS Validation

Commity not Conduct

every month. Instruction

given to impliment

meeting every month 2)

maintain both files for

DHIS 2 Online and hard

copy. 3) RCH Regi.

Verify and and portal

data entry 100 EC

complited before 10

Every Month

MMU Level By MO Yes No

District Nanded - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Khanapur Taluka

DegloorI.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 05/12/2018

Brick Work in Prog.

Type 2nd plan, Check

about Line, Level and

Joints. Instruction given

to JE

District Yes No

PHC Mukramabad

Taluka MukhedI.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 05/12/2018

Main Building centering

work in prog. Must be

Level and Line.

Instruction given to JE

District Yes No

SC Pimpalgaon Taluka

ArdhapurI.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 06/12/2018

Checking about

Electrical work, wiring

and level of Patti,

District Yes No

SC Tadkhel Taluka

DegloorI.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 10/12/2018

SC finishing work in

final stage about coloring

and cliness Instruction

given to JE and

Contractor

District Yes No

PHC Sonkhed Taluka

LohaI.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 12/12/2018

Water supply work in

final stage. Instruction

given about Pipeline and

fixing of pannel bord in

properway. Instrctution

given to JE and

contractor

District Yes No

RH Loha Taluka Loha I.D.W.

Mr. Jadhav A B

(Dy. Engg.)

Date:- 20/12/2018

Water supply work in

final stage. Instruction

given about Pipeline and

fixing of pannel bord in

properway. Instrctution

given to JE and

contractor

District Yes No

RH Loha Taluka Loha

1. PFMS software entry is

very low 2. Concurrent

Audit 1 and 2 quarter

compliences not Submitted

3. NHM account and RKS

ac banck reconsillation

statement not prepare

Mr. Sawade Datta BFO

Nanded Date :- 02-

12-2018

1. give training about

PFMS Software and

suggest to give benefit to

all benificiary by PFMS

only.

2. :Prepare the

compliences of Audit

paras and submit

urgently.

3. suggest to prepare

BRS emidiatly and

monthly

RH Level By MS Yes No

RH Naigaon Taluka

Naigaon

1. PFMS software entry is

very low 2. Concurrent

Audit 1 and 2 quarter

compliences not Submitted

3. NHM account and RKS

ac banck reconsillation

statement not prepare

Mr. Sawade Datta BFO

Nanded Date :-

26-12-2018

1. give training about

PFMS Software and

suggest to give benefit to

all benificiary by PFMS

only.

2. :Prepare the

compliences of Audit

paras and submit

urgently.

3. suggest to prepare

BRS emidiatly and

monthly

RH Level By MS Yes No

District Nanded - Dy.Engineer

District Nanded - BFO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Umri Taluka

Umri

1. PFMS software entry is

very low 2. Concurrent

Audit 1 and 2 quarter

compliences not Submitted

3. NHM account and RKS

ac banck reconsillation

statement not prepare

Mr. Sawade Datta BFO

Nanded Date :- 28-

12-18

1. give training about

PFMS Software and

suggest to give benefit to

all benificiary by PFMS

only.

2. :Prepare the

compliences of Audit

paras and submit

urgently.

3. suggest to prepare

BRS emidiatly and

monthly

RH Level By MS Yes No

PHC ARdhapur Taluka

Loha

1) ILR defrizer regular

temp. maintenande

2) Biometric machine is off

3) biomedical equipment

register

Mr. T.B. Kulkarni Nanded

Date :- 07/12/2018

action are recommended

to MO PHC

and staff of the PHC

PHC Level By MO Yes No

KINWAT BLOCKPULSE POLIO ROUND

2ND

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:04/12/2018

PULSE POLIO ROUND

2ND_ _ Institute

RH DHARMABAD

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT PREPARED 3)

STAFF TRAINING IS

INADEQUET

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:06/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL SUPERINTENDENT

AND HIS TEAM

_ Institute

PHC KARKHELI

1) BMW 2016 RULES

NOT FOLLOWING 2)

CLEANING IS

INADEQUET IN THE

HOSPITAL, 3) STAFF

TRAINING IS REMAINED

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:06/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

RH BILOLI

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT UPDATED 3) IEC

REGARDING WATER

CONSERVATION IS NOT

SEEN

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:06/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL SUPERINTENDENT

AND HIS TEAM

_ Institute

PHC SINDHI

1) BMW 2016 RULES

NOT FOLLOWING 2)

CLEANING IS

INADEQUET IN THE

HOSPITAL, 3) STAFF

TRAINING IS REMAINED

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:06/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

District Nanded -

District Nanded - QA Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH UMARI

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT SEEN 3)STAFF

TRAINING UNDER

KAYAKALP IS

INADEQUET

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:06/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

PHC KOLI

1) BMW 2016 RULES

NOT FOLLOWING 2)

CLEANING IS

INADEQUET IN THE

HOSPITAL, 3) STAFF

TRAINING IS REMAINED

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:07/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

PHC BARADSHEWALA

1) BMW 2016 RULES

NOT FOLLOWING 2)

CLEANING IS

INADEQUET IN THE

HOSPITAL, 3) STAFF

TRAINING IS REMAINED

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:07/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

PHC ARDHAPUR

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT UPDATED 3) IEC

REGARDING WATER

CONSERVATION IS NOT

SEEN

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:11/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

PHC MALEGAON

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT UPDATED 3) IEC

REGARDING WATER

CONSERVATION IS NOT

SEEN

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:11/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

PHC BHOSI

1) BMW SEGRAGATION

IS NOT PROPER 2)

CLEANING CHARTS

NOT UPDATED 3) IEC

REGARDING WATER

CONSERVATION IS NOT

SEEN

DR. SAIPRASAD SHINDE

DQAC, NANDED

DATE:11/12/2018

INSTRUCTIONS ARE

GIVEN TO CORRECT

NECESSARY

ACTIONS IN NEXT 15

DAYS

INSTITUTE LEVEL BY

MEDICAL OFFICER AND HIS

TEAM

_ Institute

District Nanded - EMS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Nanded SGGS

1)Glucostrips,IV NS

fluids,Dopamaine,noradrena

line,hydrocortisone,frusami

de,dexamethasone,

Naloxone HCL, sup. PCM,

tab. Isosorbirate, asprine

are not available

2)Poratable oxygen cylinder

submitted to BME, Foetal

dopler ,Pupillary torch,BP

apparatus search light are

not working

3)cotton Bandages all sizes,

surgical gloves & adhesive

tapes, disposable vomiting

bags are not avaialble

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 07/12/2018

1)Glucostrips,IV NS

fluids,Dopamaine,noradr

enaline,hydrocortisone,fr

usamide,dexamethasone,

Naloxone HCL, sup.

PCM, tab. Isosorbirate,

asprine are not available

2)Poratable oxygen

cylinder submitted to

BME, Foetal dopler

,Pupillary torch,BP

apparatus search light are

not working

3)cotton Bandages all

sizes, surgical gloves &

adhesive tapes,

disposable vomiting bags

are not avaialble

DM MEMS YesDM MEMS

Level

Dharmabad RH

1)antiseptic sloution, inj.

Adrenaline, cal. Gluconate,

NTG,diazepam/ midazolam,

MgSO4,Tab. Isosorbitrate,

Amlodepine are not

available

2)Delivery

kit,Leucoplst,binasal canula,

tringular bandages,teeth

guards, cold packs, sample

collection tubes.

3)siren, AC & invertor is

not working

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 12/12/2018

1)antiseptic sloution, inj.

Adrenaline, cal.

Gluconate,

NTG,diazepam/

midazolam, MgSO4,Tab.

Isosorbitrate,

Amlodepine are not

available

2)Delivery

kit,Leucoplst,binasal

canula, tringular

bandages,teeth guards,

cold packs, sample

collection tubes.

3)siren, AC & invertor is

not working

MO PHC Ardhapur & DM MEMS Yes

DM MEMS

Level & MO

Level

Biloli RH

1)IV D5, Inj.Dobutamine,

NTG,Hydrocortisone,midas

olam,dexamethasone,amnia

darone,Mg So4, syr

PCM,tab. Isosorbitrate &

Amlodepine are not

available

2)glucometer showing error

3)triangular

bandages,vomiting bags are

not available

vomiting bags

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 12/12/2018

1)IV D5,

Inj.Dobutamine,

NTG,Hydrocortisone,mi

dasolam,dexamethasone,

amniadarone,Mg So4,

syr PCM,tab.

Isosorbitrate &

Amlodepine are not

available

2)glucometer showing

error

3)triangular

bandages,vomiting bags

are not available

vomiting bags

DM MEMS NoDM MEMS

Level

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Umri RH ( Dh premices)

1)inj. Dopamine,

noradrenaline,

Dexamethasone,MgSO4,IV

D5,inj. Amiadarone, tab.

Amlodepine, are not

available

2)BP apparatus requires

cells, Pupillary torch

3)siren not working

S.A.Kottakondawar

EMS coordinator, Nanded

with ASHKOM team

Dt. 14/12/2018

1)inj.

Dopamine,noradrenaline,

Dexamethasone,MgSO4,

IV D5,inj. Amiadarone,

tab. Amlodepine, are not

available

2)BP apparatus requires

cells, Pupillary torch

3)siren not working

DM MEMS YesDM MEMS

Level

Nanded WH

1)pain & vinodine

spary,inj.adrenaline,

Dopamine,Nordrenaline,NT

G,hydrocortisone,midazola

m,derifyline,amiadarone,

Nalasone HCL, sodium

valporate, tab asprine,

isosorbitrate are not

available

2)BP appratus given for

repair

3) 3 way stop cork, nasal

airways,leucoplast,triangual

ar bandgaes Not available

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 19/12/2018

1)pain & vinodine

spary,inj.adrenaline,

Dopamine,Nordrenaline,

NTG,hydrocortisone,mid

azolam,derifyline,amiada

rone, Nalasone HCL,

sodium valporate, tab

asprine, isosorbitrate are

not available

2)BP appratus given for

repair

3) 3 way stop cork, nasal

airways,leucoplast,triang

ualar bandgaes Not

available

DM MEMS YesDM MEMS

Level

Naigaon RH

1)IV NS not

avaialble,Inj.hydrocortisone,

midazolam,

Glucostrips,MgSO4,

Hydrocortisone,

amiadarone,isosorbitrat are

not avaialable

2)back wheel of ambulance

cot is broken, search light is

given for repair

3) 2 tyres required, front

glass is broken, Horn &

siren not working, mike not

working,

4) regarding good samaritan

letter implementation

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 19/12/2018

1)IV NS not

avaialble,Inj.hydrocortiso

ne,midazolam,

Glucostrips,MgSO4,

Hydrocortisone,

amiadarone,isosorbitrat

are not avaialable

2)back wheel of

ambulance cot is broken,

search light is given for

repair

3) 2 tyres required, front

glass is broken, Horn &

siren not working, mike

not working,

4) regarding good

samaritan letter

implementation

DM MEMS yesDM MEMS

& MS Sir level

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Manjram PHC

1)pain,

Mistdress,vinodien,coolex

sprays,inj.

Dopamine,hydrocortisone,di

azepam,phenaramine

mealate,Phenaramine

mealate,amiadarone,MgSO

4, sodium

valporate,,Nalaxone HCL

tab.

Isosorbitrate,asprine,amlode

pine are not available

2)BP apparatus showing

error, glucometer given for

repair,

3)Invertor is not working

S.A.Kottakondawar

EMS coordinator, Nanded

Dt.20/11/2018

1)pain,

Mistdress,vinodien,coole

x sprays,inj.

Dopamine,hydrocortison

e,diazepam,phenaramine

mealate,Phenaramine

mealate,amiadarone,MgS

O4, sodium

valporate,,Nalaxone HCL

tab.

Isosorbitrate,asprine,aml

odepine are not available

2)BP apparatus showing

error, glucometer given

for repair,

3)Invertor is not working

DM Level yesDM MEMS

Level

Degloor SDH

1)IV

hemaxyl,Inj.Dobutamine,no

adrenaline,KCL ,aloxone

HCL,tab. isosorbitrate are

not available

2)Syring infusion pump is

kept aside

3)transfer sheet

requiredTringular bandages,

Adhesasive tapes,vomitng

bags not available

4) No sonography services

are available from last 4

months

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 20/12/2018

1)IV

hemaxyl,Inj.Dobutamine,

noadrenaline,KCL

,aloxone HCL,tab.

isosorbitrate are not

available

2)Syring infusion pump

is kept aside

3)transfer sheet

requiredTringular

bandages, Adhesasive

tapes,vomitng bags not

available

4) No sonography

services are available

from last 4 months

DM Level yes

DM MEMS

Level

Ms sir level

Hanegaon PHC

1)IV D5, Inj. dopamine,

dobutamine,

NTG,hydrocortisone,frusam

ide,midazolam,phenaatoin

sodium,Phenaramine

mealate,Dexamethasone,am

iadarone,MgSO4, Sterile

water,Sodium valporate,

Tab.

Isosorbitrate,asprine,amlode

pine are not available &

gluco strips NA

3)BP aaparatus weak

cells,search light charger

not available & AC not

working,Horn not

working,siren light off, fog

light off

S.A.Kottakondawar

EMS coordinator, Nanded

with PCR Team Dt.

20/12/2018

1)IV D5, Inj. dopamine,

dobutamine,

NTG,hydrocortisone,frus

amide,midazolam,phenaa

toin sodium,Phenaramine

mealate,Dexamethasone,

amiadarone,MgSO4,

Sterile water,Sodium

valporate, Tab.

Isosorbitrate,asprine,aml

odepine are not available

& gluco strips NA

3)BP aaparatus weak

cells,search light charger

not available & AC not

working,Horn not

working,siren light off,

fog light off

DM Level In processDM MEMS

Level

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Bhokar RH

1)pain spary, Antiseptic

solution,IV

NS,cal.gluconate,dopamine,

frusamide,dexamethasone,a

miadaron,mannitol,naloxon

e HCl, tab. Isosorbitrate,

asprinr, amlodepine are not

available

2)transport ventilator

leakage proble, Search light

charger is not available

3)tyres need to be change

S.A.Kottakondawar

EMS coordinator, Nanded

Dt.21/12/2018

1)pain spary, Antiseptic

solution,IV

NS,cal.gluconate,dopami

ne,

frusamide,dexamethason

e,amiadaron,mannitol,nal

oxone HCl, tab.

Isosorbitrate, asprinr,

amlodepine are not

available

2)transport ventilator

leakage proble, Search

light charger is not

available

3)tyres need to be change

MO level & DM Level In process

MO PHC &

DM MEMS

Level

Barhali PHC ( Dh

premices)

1)pain spray,Inj.atropine,

Dopamine,Noradrenaline,Fr

usamide, diazepam,

MgSO4,

Lignocane,amiadarone,

Nalaxone HCL, Tab.

Isosribitrate,amlodepine, are

not avaiable & glucostrips

are not available

2)nasaogatric tube,

triangular

bandages,adhessive tapes,

teeth guards, Triangular

bandages

3))patient cabin AC

damaged and not working,

S.A.Kottakondawar

EMS coordinator, Nanded

with Dt

22/12/2018

1)pain spray,Inj.atropine,

Dopamine,Noradrenaline

,Frusamide, diazepam,

MgSO4,

Lignocane,amiadarone,

Nalaxone HCL, Tab.

Isosribitrate,amlodepine,

are not avaiable &

glucostrips are not

available

2)nasaogatric tube,

triangular

bandages,adhessive

tapes, teeth guards,

Triangular bandages

3))patient cabin AC

damaged and not

working,

DM Level In processDM MEMS

Level

Loha RH

1)IV NS, DNS, D5, D5%,

Dopamine,pain spray,

inj.hydrocortisone,MgSo4,n

alaxone HCL, tab.

Isosrobitrate, Asprine,

amlodepine, are not

avaialble

2)Vomiting bagsa,teeth

guard,IV set,triangular

bandages,cervical coller is

broken, teeth guard are not

available

3)AC & Siren not working,

roof light off

S.A.Kottakondawar

EMS coordinator, Nanded

Dt. 24/12/2018

1)IV NS, DNS, D5,

D5%, Dopamine,pain

spray,

inj.hydrocortisone,MgSo

4,nalaxone HCL, tab.

Isosrobitrate, Asprine,

amlodepine, are not

avaialble

2)Vomiting bagsa,teeth

guard,IV set,triangular

bandages,cervical coller

is broken, teeth guard are

not available

3)AC & Siren not

working, roof light off

DM Level In processDM MEMS

Level

District Nanded - RBSK Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH Gokunda

( Kinwat team no.4)RBSK CO.

Mr. Kamble AB RBSK Co.

Date. 20/12/2018

1) as MCTS & Adhaar

number was not available

hence not written in

screening cards

2) their visits were not

according to given ATP

3) records of SAM/

MAM childrens are not

updated

District level Yes No

RH Mudkhed team no. 1

& 2 RBSK CO.

Mr. Kamble AB RBSK Co.

Date. 26/12/2018

1) as MCTS & Adhaar

number was not available

hence not written in

screening cards

2) their visits were not

according to given ATP

3) records of SAM/

MAM childrens are not

updated

District level Yes No

Ardhapur team no. 2 RBSK CO.Mr. Kamble AB RBSK Co.

Date. 27/12/2018

1) Team LMO is not

regular for school &

anganwadi visits

2) as MCTS & Adhaar

number was not available

hence not written in

screening cards

3) their visits were not

according to given ATP

4) records of SAM/

MAM childrens are not

updated

District level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 03/12/2018

Dr. Sudhir Nimkar,Dr.

Mangala Deshmukh &

Dr. Qmar Sultana case

attended in CJM Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 04/12/2018

Dr. Qumar sultana case

in CJM NandedDistrict Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 10/12/2018

Dr. Bole Case in Session

Court NandedDistrict Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 11/12/2018

Dr. Sudhir Nimkar case

attended in CJM Nanded

.Dr.Alurkar & Dr. U.L.

Jadhav Case in Session

Court Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 18/12/2018

Dr. Kalpana Jamdade

case attended in

Add.CJM Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 18/12/2018

Dr. Sudhir Nimkar & Dr.

Qmar Sultana case

attended in CJM Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 19/12/2018

Dr. Tanuja Barde Case in

CJM NandedDistrict Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 21/12/2018

Dr. Qmar Sultana case

attended in CJM NandedDistrict Level Yes No

District Nanded - PCPNDT Legal Counsilor

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 22/12/2018

Dr. Qmar Sultana & Dr.

Mangala Deshmukh case

attended in CJM Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 24/12/2018

Dr. Sudhir Nimkar case

attended in CJM NandedDistrict Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 26/12/2018

Attended Advisory

committee meeting At

CS Nanded. Court

hearing in matter of Dr.

Uma Dev,Dr.Pramod

Zunjare,Dr. minal

Patil,Dr. Gaytri Wadekar

attended in CJM Court

Nanded

District Level Yes No

Nanded Legal Issues

Adv. Rathod Pooja

PCPNDT Legal Counsilor

Nanded Dt. 28/12/2018

Dr. Mangala Deshmukh

case attended in CJM

Nanded

District Level Yes No

THO Mukhed Sickle cell & RKS

Miss. Sarpate Asha Sickle

Cell Co. Date :-

07/12/2018

1) RKS GB, EC Meeting

Register not Available 2)

Sickle cell Suffer

Register Not Available

3)Sickle cell Poster Not

Available

THO Level By THO Yes No

Tho Biloli Sickle cell & RKS

Miss. Sarpate Asha Sickle

Cell Co. Date :-

12/12/2018

1)RKS metting 2) Data

sheet Not Match 3) RKS

GB, EC Meeting

Register Not Available

THO Level By THO Yes No

THO Loha Sickle cell & RKS

Miss. Sarpate Asha Sickle

Cell Co. Date :-

19/12/2018

2) Data sheet Not Match

3) RKS GB, EC Meeting

Not Available

THO Level By THO Yes No

Phc Wadgao Sickle cell & RKS

Miss. Sarpate Asha Sickle

Cell Co. Date :-

26/12/2018

1) RKS GB, EC Meeting

Register not Available 2)

Sickle cell Suffer

Register Not Available

3)Sickle cell Poster Not

Available

PHC Level By MO Yes No

Tho Kandhar Sickle cell & RKS

Miss. Sarpate Asha Sickle

Cell Co. Date :-

27/12/2018

1)RKS Audit Report

Pending 2) Data sheet

Not Match 3) RKS GB,

EC Meeting Not

Available

THO Level By THO Yes No

RH Kandhar Taluka

KandharASHA Cell related Issues ASHA Co. 05/12/2018 ASHA Related Issues RH Level By MS Yes No

District Nanded - Sickle Cell Co.

District Nanded - Asha Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Shahapur Taluka

DegloorASHA Cell related Issues ASHA Co. 07/12/2018 ASHA Related Issues PHC Level By Mo Yes No

PHC Ardhapur Taluka

ArdhapurASHA Cell related Issues ASHA Co. 14/12/2018 ASHA Related Issues PHC Level By MO Yes No

SC Lone Taluka

ArdhapurASHA Cell related Issues ASHA Co. 21/12/2018 ASHA Related Issues SC Level By ANM Yes No

PHC Limbgaon RKSK related Issures

Miss. Gundale Dhanshree

RKSK Co., Nanded

Dt. 04/12/2018

1)maitri clinic not

available to seprate room

2)maitri clinic instrument

Not Purchase 3)monthly

report Releated any

issue

PHC Level By MO Yes No

PHC Limbgaon RKSK related Issures

Miss. Gundale Dhanshree

RKSK Co., Nanded

Dt. 18/12/2018

1)maitri clinic not

available to seprate

room2) Maitri clinic

Register Not

MaintainNot Established

& Material Not Purchase

PHC Level By MO Yes No

RH Umri RKSK related Issures

Miss. Gundale Dhanshree

RKSK Co., Nanded

Dt. 28/12/2018

1) Maitri clinic Register

Not Maintain2)Maitri

clinic Health Books were

Not Available 3) Rack

not Available 4)maitri

clinic Instrument Nat

Purchase

RH Level By MS Yes No

PHC Sindhi RKSK related Issures

Miss. Gundale Dhanshree

RKSK Co., Nanded

Dt. 28/12/2018

1)Maitri Clinic Any

Material& instrument

Not Available2)main

door curtain not available

3)maitri8 clinic Register

Not purchase& Maintain

PHC Level By MO Yes No

Bhandara - DHO/CS

,Sakoli - Visit to

SDH/THO Sakoli PHC &

SC

Visit to Health Institutions

Dy. Director, Health

Services, NAGPUR ,12-

11-2018

Visit to Health

InstitutionsDist Yes

Lakhani- Visit to RH

Palandur THO Lakhani,

PHC Pipalgaon & SC

Visit to Health Institutions 12-12-2018Visit to Health

InstitutionsDist Yes

District Nanded - RKSK Co.

Circle Nagpur - DDHS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Wardha - DHO/CS

Wardha, THO Wardha,

PHC- Kharangana,

Hamdapur & Sc

Visit to Health Institutions 13/12/2018Visit to Health

InstitutionsDist Yes

Nagpur- Visit to DHO/CS

, PHC Kondamendhi, SC-

Aroli,SC Dhanoli

Kondamendhi, SC

Kondamendhi B

Visit to Health Institutions 14/12/2018Visit to Health

InstitutionsDist Yes

Gadchiroli- DHO/CS

Gadchiroli, PHC Porla &

SC

Visit to Health Institutions 18/12/2018Visit to Health

InstitutionsDist Yes

Visit to DHO/CS, PHC-

Mausi, SC Mendha

Mausi,SC Moushi, SC

Paharni

Visit to Health Institutions 19/12/2018Visit to Health

InstitutionsDist Yes

Visit to DHO/CS, PHC

Davaniwada, SC-

Dawaniwada,SC

Dhapewada, SC Navegaon

Davaniwada

Visit to Health Institutions 20/12/2018Visit to Health

InstitutionsDist Yes

Visit to RH Arjuni

Morgaon, PHC Kesori,

RH Goregaon, PHC

Kurhadi, Chopa, RH

Sadak Arjuni, PHC

Pandhari, KhodShivani.

Visit to Health Institutions

Assistant Director, Health

Services, NAGPUR

,17/12/2018

Visit to Health

InstitutionsDist. Yes

Work site inspection visit

to DH Bhandara.Visit to Health Institutions 18/12/2018

Visit to Health

InstitutionsDist. Yes

Visit to SDH Chimur,

PHC Khodsungi, RH

Gond Pipari, PHC Dhaba,

Tohogaon, THO

Pombhurna, PHC

Pombhurna.

Visit to Health Institutions 19/12/2018Visit to Health

InstitutionsDist. Yes

Visit to SDH Ramtek,

PHC Mansar,THO

Savner, PHC Patan

Sawangi, Khapa, to RH

Narkhed, THO Katol.

Visit to Health Institutions 20/12/2018Visit to Health

InstitutionsDist. Yes

Circle Nagpur - ADHS

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Bhandara - DHO/CS,

PHC-Chulhad, SC-

Bapera,SC-Chulhad,SC-

Hardoli H

Visit to Health InstitutionsCPM NAGPUR,12-11-

2018

Visit to Health

InstitutionsDist. Yes

Visit to DHO/CS, PHC-

Karwahi, SC-Bandra, SC-

Devalapar,SC-Karwahi

Visit to Health Institutions 12-12-2018Visit to Health

InstitutionsDist. Yes

Visit to DHO/CS, PHC-

Ghonadi,SC-Alewada,SC-

Ambhora Ghonadi

Visit to Health Institutions 13/12/2018Visit to Health

InstitutionsDist. Yes

Visit to DHO/CS,PHC

Anji IPHS, SC-

Kamthi,SC Mahakal, SC

Mandwa Anji

Visit to Health Institutions 14/12/2018Visit to Health

InstitutionsDist. Yes

Visit to DHO/CS-

Wardha, PHC-Girad,SC-

Dhondgaon,SC-Girad,SC-

Kora

Visit to Health Institutions 18/12/2018Visit to Health

InstitutionsDist. Yes

PHC- Mansar,SC-

Bondri,SC-Borda

Mansar,SC-Kandri

Mansar

Visit to Health Institutions 19/12/2018Visit to Health

InstitutionsDist. Yes

Visit to DHO/CS, PHC-

Wadhona,SC- Gangasagar

Heti,SC Girgaon

Wadhona

Visit to Health Institutions 20/12/2018Visit to Health

InstitutionsDist. Yes

Gadchiroli- DHO/CS

Gadchiroli, PHC -

Deolgaon,SC-Andhali

Deolgaon,SC Antargaon

Deolgaon

Visit to Health Institutions 26/12/2018Visit to Health

InstitutionsDist. Yes

PHC-Chulhad,SC-Mohadi

Khapa,SC-Paraswada

Chulhad,SC-Temani

Visit to Health Institutions 27/12/2018Visit to Health

InstitutionsDist. Yes

Nil Deepika Gorde (DPM)

Nil Nil Nil Nil

Circle Nagpur - CPM

District Nagpur - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Takalghat Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

04-12-2018

Detailed report submitted

to Hon. DHO facility level Yes facility level

PHC Borkhedi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

05-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Nagardhan Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

06-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Bhandarbodi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

06-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Mansaar Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

07-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Navegaon Khairi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

12-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Tishti Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

13-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Gondkhairi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

13-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Dhapewada Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

13-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Mohapa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

13-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Makardhokada Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

14-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Bela Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

15-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Gumthi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

18-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Chicholi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

19-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

District Nagpur - QA Co.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Badegaon Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

20-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Kelwad Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

21-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Khapa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

21-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Kondhali Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

24-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Kacharisawanga Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

24-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Mowad Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

25-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Jalalkheda Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

25-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Yenwa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

26-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Mouda Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

28-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Tarsa Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

31-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

PHC Kodamendhi Kayaklp Peer assessmentDR R.D.Debadwar, DQAC

31-12-2018

Detailed report submitted

to Hon. DHO facility level yes facility level

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Borkhedi

1. RKS EC GB Meeting

2. Kayakalp Checklist

3. Audit 4) RCH Portal 5)

JSSK

Mr. Rajendra Kakde

M & Eo

Dt. 06/12/2018

1. EC & GB Meetings

should be conducted

within the month of

which procedding should

be sent to dist . Level

2. As per Kayapalat

Cheklist score of Facility

should be mailed within

3 days

3. Records should be

updated for RKS &

Statutory audit sheduled

in JUly & august. 4)

RCH Portal Data Entry

should be Poor and

Instruction for timly data

Entry 5) RT Droup back

below 75 % & Pick 25 %

District Level

DAGA WH

1. RKS EC GB Meeting

2. Kayakalp Checklist

3. Audit 4) RCH Portal 5)

JSSK

Mr. Rajendra Kakde

M & Eo

Dt. 15/12/2018

1. EC & GB Meetings

should be conducted

within the month of

which procedding should

be sent to dist . Level

2. As per Kayapalat

Cheklist score of Facility

should be mailed within

3 days

3. Records should be

updated for RKS &

Statutory audit sheduled

in JUly & august. 4)

RCH Portal Data Entry

should be Poor and

Instruction for timly data

Entry 5) RT Droup back

below 75 % & Pick 25 %

District Level Yes Nill

SDH.Ramtek

arsh report,about model

maitree clinic,iec,outreach

activity,Review of wifs

programme

Reena Bobade ARSH CO-

ORDINATOER 07.12.18

ICTC counselor, Health

workerBlock Level No No

Sirsi PHC-Sirsi Site visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

04/12/18

yes

Visited to PHC-Sirsi Construction

Site for the Supervision of

Construction Activity, Check Brick

Work, Quality of Work ,Material

and Plumb of Brick Work Given

technical Instruction to Contractor

yes no

District Nagpur - Jr.Engineer

District Nagpur - M&E OFFICER

District Nagpur - Arsh Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Sirsi PHC-Sirsi Site visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

12/12/18

yes

Visited to PHC-Sirsi Construction

Site for the Supervision of

Construction Activity, Check Brick

Work, Quality of Work ,Material

and Plumb of Brick Work Given

technical Instruction to Contractor

yes no

RH Katol RH Katol visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

14/12/18

yes RH Katol visit yes no

Sirsi PHC-Sirsi Site visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

15/12/18

yes

Visited to PHC-Sirsi Construction

Site for the Supervision of

Construction Activity, Check Brick

Work, Quality of Work ,Material

and Plumb of Brick Work Given

technical Instruction to Contractor

yes no

Kalmeshwar RH Kalmeshwar visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

17/12/18

yes RH Kalmeshwar visit yes no

Chicholi PHC Chicholi visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

20/12/18

yes PHC Chicholi visit yes no

Sirsi PHC-Sirsi Site visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

25/12/18

yes

Visited to PHC-Sirsi Construction

Site for the Supervision of

Construction Activity, Check Brick

Work, Quality of Work ,Material

and Plumb of Brick Work Given

technical Instruction to Contractor

yes no

Mumbai Mumbai meeting attend

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

26/12/18

yes Mumbai meeting attend yes no

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Sirsi PHC-Sirsi Site visit

Moh. Khalid A. Hafiz

(Junior .Engineer) dt.

28/12/18

yes

Visited to PHC-Sirsi Construction

Site for the Supervision of

Construction Activity, Check Brick

Work, Quality of Work ,Material

and Plumb of Brick Work Given

technical Instruction to Contractor

yes no

Kanhan PHC Kanhan viist

Vijay Paunikar

(Jr.Engineer) dt.

04/12/18

yes district level Yes No

SC Dighori SC Dighori visit

Vijay Paunikar

(Jr.Engineer) dt.

07/12/18

yes district level Yes No

Parshioni RH Parshioni visit

Vijay Paunikar

(Jr.Engineer) dt.

12/12/18

yes district level Yes No

Deolapar RH Deolapar visit

Vijay Paunikar

(Jr.Engineer) dt.

15/12/18

yes district level yes No

Borkhedi PHC Borkhedi visit

Vijay Paunikar

(Jr.Engineer) dt.

18/12/18

yes district level yes No

Borkhedi PHC Borkhedi visit

Vijay Paunikar

(Jr.Engineer) dt.

20/12/18

yes district level yes No

Kanhan PHC Kanhan viist

Vijay Paunikar

(Jr.Engineer) dt.

21/12/18

yes district level yes No

Takalghat, Raipur PHC Takalghat & Raipur visit

Vijay Paunikar

(Jr.Engineer) dt.

24/12/18

yes district level yes No

Parshioni RH Parshioni visit

Vijay Paunikar

(Jr.Engineer) dt.

27/12/18

yes district level yes No

Hingna RH Hingna visit

Vijay Paunikar

(Jr.Engineer) dt.

28/12/18

yes district level yes No

Kamptee SDH Kamptee visit

Vijay Paunikar

(Jr.Engineer) dt.

29/12/18

yes district level yes No

PHC Pachgaon PHC Pachgaon site visit

Shri A.R. Bhati

(Jr.Engineer)

dt. 04/12/18

yes PHC Pachgaon site visit yes no

PHC Pachgaon PHC Pachgaon site visit

Shri A.R. Bhati

(Jr.Engineer)

dt. 13/12/18

yes PHC Pachgaon site visit yes no

District Nagpur - Jr.Engineer

District Nagpur - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Pachgaon PHC Pachgaon site visit

Shri A.R. Bhati

(Jr.Engineer)

dt. 15 /12/18

yes PHC Pachgaon site visit yes no

PHC Pachgaon PHC Pachgaon site visit

Shri A.R. Bhati

(Jr.Engineer)

dt. 24 /12/18

yes PHC Pachgaon site visit yes no

PHC Pachgaon PHC Pachgaon site visit

Shri A.R. Bhati

(Jr.Engineer)

dt. 26 /12/18

yes PHC Pachgaon site visit yes no

SC Pachakhedi 1) MR Campaign1) MR Campaign

Session VisitFacility Level Yes Nil

SC Dongargaon 1) MR Campaign1) MR Campaign

Session VisitFacility Level Yes Nil

SC Fegad 1) MR Campaign1) MR Campaign

Session VisitFacility Level Yes Nil

SC Ambadi 1) MR Campaign1) MR Campaign

Session VisitFacility Level Yes Nil

PHC Mandhal

1) Jaljanya & Kitakjanya

Ajar. 2)

Medicine Stock

3) Headquarter Stay.

4) PMMVY

5) MR Campaign

DR. S.R. Nikam THO

Kuhi 07/12/2018

1) Regular Jaljanya &

Kitakjanya Ajar

Survekshan.

2) Update All Medicine

Stock Record as per

Instruction.

3) All Employees should

stay at Headquarter.

4) Fill all balance 1st

Primi ANC form & sent

to THO Office

5) MR Campaign

Session Visit

Facility Level Yes Nil

SC Wag 1) MR CampaignDR. S.R. Nikam THO

Kuhi 07/12/2018

1) MR Campaign

Session VisitFacility Level Yes Nil

SC Hardoli 1) MR CampaignDR. S.R. Nikam THO

Kuhi 07/12/2018

1) MR Campaign

Session VisitFacility Level Yes Nil

SC Tarna 1) MR CampaignDR. S.R. Nikam THO

Kuhi 10/12/2018

1) MR Campaign

Session VisitFacility Level Yes Nil

SC Jiwanapur 1) MR CampaignDR. S.R. Nikam THO

Kuhi 10/12/2018

1) MR Campaign

Session VisitFacility Level Yes Nil

District Nagpur - THO Kuhi

DR. S.R. Nikam THO

Kuhi 03/12/2018

DR. S.R. Nikam THO

Kuhi 05/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Veltur

1) Jaljanya & Kitakjanya

Ajar. 2)

Medicine Stock

3) Headquarter Stay.

4) PMMVY

5) MR Campaign

DR. S.R. Nikam THO

Kuhi 12/12/2018

1) Regular Jaljanya &

Kitakjanya Ajar

Survekshan.

2) Update All Medicine

Stock Record as per

Instruction.

3) All Employees should

stay at Headquarter.

4) Fill all balance 1st

Primi ANC form & sent

to THO Office

5) MR Campaign

Session Visit

Facility Level Yes Nil

SC Adam 1) MR CampaignDR. S.R. Nikam THO

Kuhi 14/12/2018

1) MR Campaign

Session VisitFacility Level Yes Nil

PHC Salwa

1) Jaljanya & Kitakjanya

Ajar. 2)

Medicine Stock

3) Headquarter Stay.

4) PMMVY

5) MR Campaign

DR. S.R. Nikam THO

Kuhi 19/12/2018

1) Regular Jaljanya &

Kitakjanya Ajar

Survekshan.

2) Update All Medicine

Stock Record as per

Instruction.

3) All Employees should

stay at Headquarter.

4) Fill all balance 1st

Primi ANC form & sent

to THO Office

5) MR Campaign

Session Visit

Facility Level Yes Nil

PHC Salwa

1) Jaljanya & Kitakjanya

Ajar. 2)

Medicine Stock

3) Headquarter Stay.

4) PMMVY

5) MR Campaign

DR. S.R. Nikam THO

Kuhi 24/12/2018

1) Regular Jaljanya &

Kitakjanya Ajar

Survekshan.

2) Update All Medicine

Stock Record as per

Instruction.

3) All Employees should

stay at Headquarter.

4) Fill all balance 1st

Primi ANC form & sent

to THO Office

5) MR Campaign

Session Visit

Facility Level Yes Nil

PHC Sindi Rly, (Gunj

Convent MR Campeian)

Monetring MR Campian

,Record update ,

Clenliness, IEC Board

Display

DHO 4/12/2018

Discuss , MO , Teachers,

Student ,Parents

,Pharamists , LT ,

Clerk,HA, MPW ,ANM

,Volunter,

Facility Yes No

PHC Sindi Rly,

(Kesrimal Nager

Vidyalaya Sindi Rly. MR

Campeian)

Monetring MR Campian , DHO 5/12/2018

Discuss , MO , Teachers,

Student , Parents,HA,

MPW, ANM ,Volunter,

Facility Yes No

District Wardha- DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kangaon

Sickle cell pts follow up

,record ceeck , RKS EC GB

meeting status .Planning for

100% expendature

DHO 14/12/2018

Discuss CS ,ACS,

Pharamists , LT

,Councellour

Facility Yes No

THO Office Hinganghat,

SDH Hinganghat , NUHM

Hinganghat

NUHM RKS Register

Status .RKS EC GB

meeting Record check,

Sickle cell , Electrophoresis

Testing & pts follow up

Planning for 100%

expendature

DHO 29/12/2018Discuss THO ,MS,

,Pharamists , LT , Clerk,Facility Yes No

SDH Hinganghat

1. Cleanliness is not

obsrved.

2. Not maintainance of

cashbook.

3. No Token system

Civil Surgeon, Wardha

04.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

SDH Arvi

1. Cleanliness is not

maintained.

2. EDD and EPD chart not

observed.

3. IEC material are not

sufficient.

Civil Surgeon, Wardha

07.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Wadner

1. Cashbook is not

maintained.

2. EDD and EPD chart are

not observed.

3. Animals are observed.

Civil Surgeon, Wardha

11.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Seloo

1. Drinking water system is

not maintained. 2.

IEC material is not

observed.

3. BMW is not properly

maintained.

Civil Surgeon, Wardha

14.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Deoli

1. Instruments are not

properly arranged. 2.

IEC is not enough. 3.

Water provision work under

consruction.

Civil Surgeon, Wardha

20.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Samudrapur

1. Cleanliness is not

obsrved.

2. Not maintainance of

cashbook.

3. No Token system

RMO (OR), Wardha

06.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

District Wardha- CS

District Wardha- RMO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Seloo

1. Cleanliness is not

maintained.

2. EDD and EPD chart not

observed.

3. IEC material are not

sufficient.

RMO (OR), Wardha

11.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Bhidi

1. Cashbook is not

maintained.

2. EDD and EPD chart are

not observed.

3. Animals are observed.

RMO (OR), Wardha

15.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Karanja

1. Drinking water system is

not maintained. 2.

IEC material is not

observed.

3. BMW is not properly

maintained.

RMO (OR), Wardha

18.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

RH Pulgaon

1. Instruments are not

properly arranged. 2.

IEC is not enough. 3.

Water provision work under

consruction.

RMO (OR), Wardha

21.12.2018

Given instructions to MS

and StaffDistrict Level Yes _

PHC Sindi (Rly) MR Campaign Supervision 04.12.2018 Mo Dtt

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

SC Yelakeli MR Campaign Supervision 06.12.2018 Mo Dtt

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Mandgaon ,

PHC Nandori MR Campaign Supervision 12.12.2018 Mo Dtt

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

SC Kelzar MR Campaign Supervision 14.12.2018 Mo Dtt

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

RH Samudrapur Kayakalp /NQAS

Supervision 01.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Kharangana (M)Kayakalp /NQAS

Supervision 03.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Girad Kayakalp /NQAS

Supervision 07.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

District Wardha- MO

District Wardha- QA Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH Arvi Kayakalp /NQAS

Supervision 11.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Kharangana (M)Kayakalp /NQAS

Supervision 12.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Kharangana (M)Kayakalp /NQAS

Supervision 17.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

RH Wadner/ SDH

Hinganghat

Kayakalp /NQAS

Supervision 26.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

PHC Anji Kayakalp /NQAS

Supervision 27.12.2018 DQAC

Gaps Idendifed &

Instriction given to

Concern

Facility Yes ….

RH Samudrapur/

Hamdapur

visit to RH Samudrapur &

PHC Hamdapurr Cattel

Trap & renovation work

05/12/2018 Jr.Eng

Pramod Ladekarfor measurment taken District level IDW wing yes _

PHC Allipur visit to PHC Allipur11/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Zadasi visit to PHC Zadasi14/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Vijaygopal visit to PHC Vijaygopal17/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Nachangaon visit to Nachangaon18/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Goul visit to PHC Goul19/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

District Wardha- Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Giroli visit to PHC Giroli26/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Mandgaon visit to PHC Mandgaon28/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

PHC Sidhi R visit to PHC Sidhi R31/12/2018 Pramod

Ladekar

For colouring &

brondingDistrict level IDW wing yes _

Nagpur Visit to EE Office

for Technical Sanction

Jr.Eng 01/12/2018

Pravin Kanodefor HWC SD Praposal District level IDW wing yes _

PHC Kannamwargram

Visit to Phc

kannamwargram for MR

Work

03/12/2018 Pravin

KanodeFor mr Work District level IDW wing yes _

DH Wardha Visit to Dh Wardha06/12/2018 Pravin

Kanodefor measurment taken District level IDW wing yes _

SDH ArviVisit to SDH Arvi ODF &

LDR

11/12/2018 Pravin

Kanodefor measurment taken District level IDW wing yes _

Nagpur Visit to EE Office

for Tender work

12/12/2018 Pravin

Kanode for Tender wor District level IDW wing yes _

Nagpur Visit to EE Office

for Tender work

13/12/2018 Pravin

Kanode for Tender wor District level IDW wing yes _

PHC Kannamwargram

Visit to Phc

kannamwargram for MR

Work

14/12/2018 Pravin

KanodeFor mr Work District level IDW wing yes _

DH Wardha Visit to Dh Wardha19/12/2018 Pravin

Kanodefor measurment taken District level IDW wing yes _

SDH ArviVisit to SDH Arvi ODF &

LDR

26/12/2018 Pravin

Kanodefor measurment taken District level IDW wing yes _

Kharangna go

1 - MR Campain2)Exp

Incentive 3)ASHA

AwardPrerna Programme

ASHA,26/12/2018

Ku. Dipali Chandole

Supervision In MR

Programe.

Attted the ASHA Survey

Prerna Programme and

asha incentive review

and asha Exp asha head.

Block and Phc Level to block

facilator yes

District Wardha- Jr.Engineer

District Wardha- Asha Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Aanji

2 - MR Campain2)Exp

Incentive 3)ASHA

AwardPrerna Programme

30/12/2018

Ku. Dipali Chandole

Supervision In MR

Programe.

Attted the ASHA Survey

Prerna Programme and

asha incentive review

and asha Exp asha head.

Phc Level to block facilator yes

Karanja

3 - MR Campain2)Exp

Incentive 3)ASHA

AwardPrerna Programme

31/12/2018

Ku. Dipali Chandole

Supervision In MR

Programe.

Attted the ASHA Survey

Prerna Programme and

asha incentive review

and asha Exp asha head.

Phc Level to block facilator and yes

PHC Sindi Rly, (Gunj

Convent MR Campeian)

Sickle Cell .

A7:G10Ku.Annapurna V.

Dhobale 4/12/2018

Sickle Cell . Ku.Annapurna

V. Dhobale 4/12/2018

Discuss , MO , Teachers,

Student ,Parents

,Pharamists , LT ,

Clerk,HA, MPW ,ANM

,Volunter,

Facility Yes No

PHC Sindi Rly,

(Kesrimal Nager

Vidyalaya Sindi Rly. MR

Campeian)

Monetring MR Campian ,Ku.Annapurna V. Dhobale

5/12/2018

Discuss , MO , Teachers,

Student , Parents,HA,

MPW, ANM ,Volunter,

Facility Yes No

DH Wardha

Sickle cell pts follow up

,record ceeck , RKS EC GB

meeting status .Planning for

100% expendature

Ku.Annapurna V. Dhobale

14/12/2018

Discuss CS ,ACS,

Pharamists , LT

,Councellour

Facility Yes No

THO Office Hinganghat,

SDH Hinganghat , NUHM

Hinganghat

NUHM RKS Register

Status .RKS EC GB

meeting Record check,

Sickle cell , Electrophoresis

Testing & pts follow up

Planning for 100%

expendature

Ku.Annapurna V. Dhobale

29/12/2018

Discuss THO ,MS,

,Pharamists , LT , Clerk,Facility Yes No

SAMUDRAPUR-

WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.

03/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

District Wardha- Sickle Cell Co-ordintor

District Wardha- RBSK Co.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PULGAON-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

05/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

SMUDRAPUR-

WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

07/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

ARVI-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

10/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

SDH LEVEL Yes ---

ASHTI-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

12/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

PHC LEVEL Yes ---

PULGAON-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.

14/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

WADNER-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.

18/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved

RH LEVEL Yes ---

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

HINGANGHAT -

WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

19/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

SDH LEVEL Yes ---

KHARANGANA-

WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

21/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

SELOO-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

24/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

KARANJA-WARDHA-

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.checked grand

of RBSK.Taken review of

salary off all RBSK

Team,vehicle payments,

26/12/2018 RBSK Co

Salary and vehicle

payment should with in

period,per day cheking

students target should

achieved of anganwadi

and school

RH LEVEL Yes ---

ASHTI-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.

28/12/2018 RBSK Co

cheking students[

school,anganwadi ]

target should achieved

PHC LEVEL Yes ---

ARVI-WARDHA

Visit to RBSK Team about

school and anganwadi

check-up,review taken by

RBSK Team.

31/12/2018 RBSK Co

cheking students[

school,anganwadi ]

target should achieved

SDH LEVEL Yes ---

PHC Sindi r &

School,wahitpur

PHC and School Visit for

MR Comp.01/12/2018 THO Seloo

PHC and School Visit for

MR Comp.Block level By THO Yes

District Wardha- THO Seloo

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Surgoan &

School,jaipur,PHC

Hamdapur,

SC and School Visit for MR

Comp.03/12/2018 THO Seloo

SC and School Visit for

MR Comp.Block level By THO Yes

PHC Sindi R.,Sc Kelzar

and School

PHC and School Visit for

MR Comp.06/12/2018 THO Seloo

PHC and School Visit for

MR Comp.Block level By THO Yes

SC and School Yelakeli

,PHC Hamdapur

SC and School Visit for MR

Comp.PHC Visit07/12/2018 THO Seloo

SC and School Visit for

MR Comp.PHC VisitBlock level By THO Yes

SC Jungad and

School,Gaimukh

SC and School Visit for MR

Comp.PHC Visit10/12/2018 THO Seloo

SC and School Visit for

MR Comp.PHC VisitBlock level By THO Yes

SC Akoli and School,

Nawargoan,Seldoh PHC

Salaikala

SC and School Visit for MR

Comp.PHC Visit12/12/2018 THO Seloo

SC and School Visit for

MR Comp.PHC VisitBlock level By THO Yes

Dhanoli,KhapriSC and School Visit for MR

Comp.PHC Visit14/12/2018 THO Seloo

SC and School Visit for

MR Comp.PHC VisitBlock level By THO Yes

PHC Salaikala,GarmsurPHC and School Visit for

MR Comp.SC visit17/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

Sc Hingni,PHC SalaikalaPHC and School Visit for

MR Comp.SC visit19/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

PHC Zadshi,RehakiPHC and School Visit for

MR Comp.SC visit20/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

Sc Parsodi,PHC

Sindi.,Shirsamudra

PHC and School Visit for

MR Comp.SC visit24/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

SC Akoli,MhsalaSC and School Visit for MR

Comp.SC visit27/12/2018 THO Seloo

SC and School Visit for

MR Comp.SC visitBlock level By THO Yes

SC KotmbaPHC and School Visit for

MR Comp.SC visit28/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

SC Akoli,JaminiPHC and School Visit for

MR Comp.SC visit31/12/2018 THO Seloo

PHC and School Visit for

MR Comp.SC visitBlock level By THO Yes

PHC Dahegoan Go,

Morchapur,WaitpurPHC & SC Visit

Ashwini S Mendhe,DEO

Seloo 01/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)

District Wardha- DEO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Dahegoan Go,

Kanhapur,Gondapur,

Ramna,SC Sukli St

PHC & SC VisitAshwini S Mendhe

03/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)

SC Kopra,Chanki,Seloo SC,School,AW VisitAshwini S Mendhe

04/12/2018SC,School,AW Visit Block (Data Entry Operator)

SC Yelakeli,Jamni,Seloo DHO office WardhaAshwini S Mendhe

05/12/2018SC Yelakeli,Jamni,Seloo Block (Data Entry Operator)

Deulgaon,Hamdapur SC VisitAshwini S Mendhe

07/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)

DHO office Wardha DHO office WardhaAshwini S Mendhe

10/12/2018DHO office Wardha Block (Data Entry Operator)

PHC Zadshi,Junona PHC VisitAshwini S Mendhe

12/12/2018PHC & SC Visit MR Supervision Block (Data Entry Operator)

SC Akoli SC VisitAshwini S Mendhe

13/12/2018SC Visit Block (Data Entry Operator)

SC Bori SC VisitAshwini S Mendhe

17/12/2018SC Visit Block (Data Entry Operator)

DHO office Wardha DHO office WardhaAshwini S Mendhe

19/12/2018DHO office Wardha Block (Data Entry Operator)

Sc Takli, SC VisitAshwini S Mendhe

20/12/2018SC Visit MR Supervision Block (Data Entry Operator)

SC Sukli St.,Antrgoan,

Borkhedi K,PHC Zadshi,PHC & SC Visit

Ashwini S Mendhe

21/12/2018PHC & SC Visit VHND Visit Block (Data Entry Operator)

PHC Sindi R PHC VisitAshwini S Mendhe

24/12/2018PHC Visit Block (Data Entry Operator)

SC Akoli SC VisitAshwini S Mendhe

27/12/2018SC Visit Block (Data Entry Operator)

PHC Dahegoan Go, &

Hamdapur PHC Visit

Ashwini S Mendhe

29/12/2018PHC Visit Block (Data Entry Operator)

PHC Zadshi & Salaikala PHC VisitAshwini S Mendhe

31/12/2018PHC Visit Block (Data Entry Operator)

THO Lakhani, Salebhata,

Kesalwada

DHO,Dr. Prashant Uikey,

Dt.26.12.18YES PHC & SC

District Bhandara - DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Kondha, PahelaDr. Prashant Uikey,

Dt.27.12.18YES PHC & SC

THO Lakhani,

Lakhandur, PHC

Murmadi, Dighori,

Barwha, Kudegaon

Dr. Prashant Uikey,

Dt.29.12.18YES PHC & SC

PHC Digori, Barwha,

Lakhandur

Dr. Prashant Uikey,

Dt.30.12.18YES PHC & SC

RH Sihora1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 11/12/2018

1) Department 2)

follow up PWD Facility Yes

RH MOHADI1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 12/12/2018

1) Department 2)

follow up PWD Facility Yes

SDH SAKOLI1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 15/12/2018

1) Department 2)

follow up PWD Facility Yes

RH LAKHANI1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 15/12/2018

1) Department 2)

follow up PWD Facility Yes

SDH Tumsar1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 22/12/2018

1) Department 2)

follow up PWD Facility Yes

RH PALANDUR1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 27/12/2018

1) Department 2)

follow up PWD Facility Yes

RH LAKHANDUR1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt. 27/12/2018

1) Department 2)

follow up PWD Facility Yes

SDH Tumsar1) Manpower issue

2) Construction Issue

DR. Pramod Khandate (CS

)dt..30/12/2018

1) Department 2)

follow up PWD Facility Yes

SDH SAKOLI1) Manpower Issue

2) Infrastructure issue

DR. P. JAKKAL(RMO) dt.

12-12-2018

1) Department 2)

follow up PWD Facility Yes

RH PALANDUR1) Manpower issue

2) Construction Issue

DR. P. JAKKAL(RMO) dt.

15/12/2018

1) Department 2)

follow up PWD Facility Yes

District Bhandara - CS

District Bhandara - RMO

District Bhandara - M&E OFFICER

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC JAMBPMMVY Forms not filled

all, RCH Portal not updated

M&E,Smt. Damayanti.

Kature 4/12/2018PHC, SC Yes No

PHC Kudegaon

HMIS Validation committee

meeting not taken, RCH

Portal Not updated,

PMMVY Forms not filled

all,

Smt. Damayanti. Kature

18/12/2018PHC, SC Yes No

PHC Shahapur,

Mohadura

HMIS Validation committee

meeting not taken, some

issue in SC format, RCH

Portal Not updated,

PMMVY Forms not filled

all

Smt. Damayanti. Kature

21/12/2018PHC, SC Yes No

THO TUMSAR SDH

Tumsar

HMIS Validation committee

meeting not, RCH Portal

Not updated, PMMVY

Forms not filled all

Smt. Damayanti. Kature

25/12/2018PHC, SC Yes No

PHC Pahela, SC Chowa,

Manegaon

Smt. Damayanti. Kature

19/11/2018PHC, SC Yes No

PHC DhargaonChk Column Concreting up

to Slab

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.3/09/2018Yes Contractor Yes No

PHC Kesalwada, RH

Palandur

Chk. Of Lintel Steel of Type

II Qtrs of PHC and Lintel of

RH Qtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.6/09/2018Yes Contractor Yes No

PHC Dhargaon & RH-

Palandur

Visit & Taking Mtrs of

PHC and RH Qtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.10/09/2018Yes Contractor Yes No

RH-PalandurChk. Of Lintel Concreting

of Type II Qtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.14/09/2018Yes Contractor Yes No

RH-PalandurChk. Of Concreting of Slab

of Type II Qtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.18/09/2018Yes Contractor Yes No

District Bhandara - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Dhargaon, PHC

Kesalwada

Chk. Of Concreting of Slab

F/n Part & Tak Mtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.21/09/2018Yes Contractor Yes No

PHC DhargaonTaking Mtrs & Checking

Centring of Slab

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.25/09/2018Yes Contractor Yes No

RH-PalandurChk. Of Concreting of

Lintel of Type IV Qtrs

Shri Ganesh G. Tembhurne,

Jr. Engineer Dt.29/09/2018Yes Contractor Yes No

PHC JAMB

1) cleanliness not

maintained, 2) Procedings

of GB & EC not properly

recorded 3) Expenditure of

RKS, UF Not satisfactory

4) sicklecell Solubility kit

not Available.

Sickell cell,Sangita

Gondane 4/12/2018

instructed sicklecell

paients regular medicine

.RKS Mention &

updated Account Book

on properly Updated.

Facility, Mo YES NO

PHC Kudegaon

1) cleanliness not

maintained, 2) Procedings

of GB & EC not properly

recorded 3) Expenditure of

RKS, UF Not satisfactory

4) sicklecell Solubility kit

not Available.

Sangita

Gondane18/12/2018

instructed sicklecell

paients regular medicine

.RKS Mention &

updated Account Book

on properly Updated.

Facility, , Mo YES NO

PHC Shahapur,

Mohadura

1) cleanliness not

maintained, 2) Procedings

of GB & EC not properly

recorded 3) Expenditure of

RKS, UF Not satisfactory

4) sicklecell Solubility kit

not AvailIable 5) IDCF

Progrmme able.

Sangita

Gondane21/12/2018

RKS Mention & updated

Account Book on

properly Updated.

Facility, Phamacisit, Mo YES NO

THO TUMSAR SDH

Tumsar

1) cleanliness not

maintained, 2) Procedings

of GB & EC not properly

recorded 3) Expenditure of

RKS, UF Not satisfactory

4) sicklecell Solubility kit

not AvailIable 5) IDCF

Progrmme able.

Sangita

Gondane25/12/2018

RKS Mention & updated

Account Book on

properly Updated.

Facility, Phamacisit, Mo YES NO

District Bhandara - Sickle Cell Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Phc Shahapur Sc Kharbi

& Village Kharadi

ASHA Record & HBNC

Form Not Update HBNC

Home Visite Not Regularly

by Asha,Software all Entry

Not Complited Month Of

December

C.D Barai,DCM

Date- 05/12/2018

All ASHA Record &

HBNC Form Update

Monthly HBNC Home

Visite Regularly by

Asha,Software all Entry

Complited Month Of

December Withen Two

Days

1) Phc-MO,Lhv & BF 2)Sc-Asha &

ANMYes Phc & Sc

Phc Kesalwada,Sc

Garada,Channa & Village

Dhanla

ASHA Record & HBNC

Form Not Update HBNC

Home Visite Not Regularly

by Asha,Software all Entry

Not Complited Month Of

December

C.D Barai,DCM

Date- 11/12/2018

All ASHA Record &

HBNC Form Update

Monthly HBNC Home

Visite Regularly by

Asha,Software all Entry

Complited Month Of

December Withen Two

Days

1) Phc-MO,Lhv & BF 2)Sc-Asha &

ANMYes Phc & Sc

Phc Salebhata &

Pimplgaon

VHNSC Record & HBNC

Form Not Update

C.D Barai,DCM

Date- 22/12/2018

VHNSC Record &

HBNC Form Update

Monthly

1)Phc-Mo,Lhv & Bf 2)Sc- Lhv

3) Village-Asha Yes

PHC ,Sc &

Village

Phc Gobarwahi &

Nakadongari

1) Asha Software & BF

Monthly Report Not Match

2) HBNC Traner Not Not

Present Regularly by Asha

Monthly Meeting

C.D Barai,DCM

Date- 24/12/2018

1) Asha Software & BF

Monthly Report Match

Withen Due Date Every

Month 2) HBNC Traner

Will b Present Regularly

by Asha Every Monthly

Meeting

1)Phc-Mo,Bf & Lhv Yes PHC

Phc Mohadura &

Shahapur

Asha Manualy Monthly

Report Not Match Every

Month & Asha Software &

BF Monthly Report Not

Match

C.D Barai,DCM

Date- 26/12/2018

Asha Manualy Monthly

Report Match Every

Monyh & Asha Software

& BF Monthly Report

Match Withen Due Date

Every Mont

1) Phc-MO & BF 2)Village-

Asha & Bf Yes PHC & Asha

Phc Dighori & Barawa

1) Software Entry Not

Completed Month Of

November 2) Asha

Softwere,

performance,Payment, Was

Not Update 3) VHNSC

Record & HBNC Form Not

Update

C.D Barai,DCM

Date- 27/12/2018

1) Software Entry

Completed Month Of

Month Of November

Withen 4 Days 2) Asha

Softwere,

performance,Payment,

Update as Erlyar as

Possible3) VHNSC

Record & HBNC Form

Update one Week

2)Phc-Mo,LHV & Bf No PHC

District Bhandara - DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Tho Tumsar

BF Meeting-1) Mentoring

Group Meeting Proseding

Not Done 2) All Ashas Not

Paid Incentive PFMS by

Addhar link Proces C.D Barai,DCM

Date- 29/12/2018

1) Mentoring Group

Meeting Proseding

Wright to Withen 2 days

2) All Ashas Paid

Incentive PFMS by

Addhar Link Proces in

This Month

Taluka-Tho Accountant & BCM Yes Taluka

1) SDH Tumsar

1) QA Commiety Monthly

meeting Not Taken 2) Hand

Washing, Biomedical Waste

Training etc Not Completed

3) Laqshya planning for

Repair of labour Room &

OT Not Done

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 01/12/2018

1) Organize QA

Commiety Monthly

Meeting 2) Training To

be Completed

immediately 3) Estimate

to be planned for

LAQSHYA

Facility MS, Phamacist, Peon Yes No

2) PHC Goberwahi

1) Hand Washing,

Biomedical Waste Training

etc Not Completed 2)

Action plan for Kayakalp

Not Implemented

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 16/12/2018

1) Training To be

Completed immediately

2) Action plan is to be

followed immediately

Facility MO, Phamacist, Peon Yes No

3) PHC Warthi

1) Hand Washing,

Biomedical Waste Training

etc Not Completed 2)

Action plan for Kayakalp

Not Implemented

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 16/12/2018

1) Training To be

Completed immediately

2) Action plan is to be

followed immediately

Facility MO, Phamacist, Peon Yes No

4) PHC Khamba

1) QA Commiety Monthly

meeting Not Taken 2) Hand

Washing, Biomedical Waste

Training etc Not Completed

3) Cleanliness Not

Maintained 4) Fabour

Sinduri log Book Not

Maintained

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 17/12/2018

1) Organize QA

Commiety Monthly

Meeting 2) Training To

be Completed

immediately 3)

Cleaniliness to be

maintained, 4) Prepare a

Call book for Fabour

Sinduri

Facility MO, Phamacist, Peon Yes No

5)PHC Gondumari

1) QA Commiety Monthly

meeting Not Taken 2) Hand

Washing, Biomedical Waste

Training etc Not Completed

3) Cleanliness Not

Maintained 4) Fabour

Sinduri log Book Not

Maintained

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 17/12/2018

1) Organize QA

Commiety Monthly

Meeting 2) Training To

be Completed

immediately 3)

Cleaniliness to be

maintained, 4) Prepare a

Call book for Fabour

Sinduri

Facility MO, Phamacist, Peon Yes No

6)PHC Pahela

1) QA Commiety Monthly

meeting Not Taken 2) Hand

Washing, Biomedical Waste

Training etc Not Completed

3) Cleanliness Not

Maintained 4) Fabour

Sinduri log Book Not

Maintained

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 17/12/2018

1) Organize QA

Commiety Monthly

Meeting 2) Training To

be Completed

immediately 3)

Cleaniliness to be

maintained, 4) Prepare a

Call book for Fabour

Sinduri

Facility MO, Phamacist, Peon Yes No

District Bhandara - Dist.Ayush Officer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

7) PHC Lendezari1) NQAS Assesssment Nort

Completed

Dr Bhaskar Khedikar Dist

AYUSH Officer, DQAC (

In ) 22/12/2018

1) NQAS Assesssment

DoneFacility MO, Phamacist, Peon Yes No

SAKOLI

1) AWC CHECK UP

2) pending heart sergery 3)

rbsk softwere entry 4)

OTHER SURJERY

5) SHP CHECK UP

MONTH OF JULLY

RBSK CO,11-08-2018

1) PENDING HEART

SERGERY

COMPLETED IN

REGULAR. 2)

BALANCE REFFERAL

COMPLETED . 3)

BALANCE OHER

SURJERY COMPLITED

IN REGULAR CAMP.

4) SHP STARTED IN

JULLY 2018

block level yes block

MOHADI

1) AWC CHECK UP

2) pending heart sergery 3)

rbsk softwere entry 4)

OTHER SURJERY

5) SHP CHECK UP

MONTH OF JULLY

14-08-2018

1) PENDING HEART

SERGERY

COMPLETED IN

REGULAR. 2)

BALANCE REFFERAL

COMPLETED . 3)

BALANCE OHER

SURJERY COMPLITED

IN REGULAR CAMP.

4) SHP STARTED IN

JULLY 2018

block level yes block

LAKHANI

1) AWC CHECK UP

2) pending heart sergery 3)

rbsk softwere entry 4)

OTHER SURJERY

5) SHP CHECK UP

MONTH OF JULLY

21-08-2018

1) PENDING HEART

SERGERY

COMPLETED IN

REGULAR. 2)

BALANCE REFFERAL

COMPLETED . 3)

BALANCE OHER

SURJERY COMPLITED

IN REGULAR CAMP.

4) SHP STARTED IN

JULLY 2018

block level yes block

TUMSAR

1) AWC CHECK UP

2) pending heart sergery 3)

rbsk softwere entry 4)

OTHER SURJERY

5) SHP CHECK UP

MONTH OF JULLY

27-08-2018

1) PENDING HEART

SERGERY

COMPLETED IN

REGULAR. 2)

BALANCE REFFERAL

COMPLETED . 3)

BALANCE OHER

SURJERY COMPLITED

IN REGULAR CAMP.

4) SHP STARTED IN

JULLY 2018

block level yes block

RH Pauni arsh clinic opd improvedARSH CO.

BHANDARA,15-12-2018

grow opd, I strrictly

inform that outreach

programme

Districct yes Districct

District Bhandara - RBSK Co.

District Bhandara - Arsh Co.

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH TUMSAR arsh clinic opd improved 12/120/2018

grow opd, I strrictly

inform that outreach

programme

Districct yes Districct

SDH SAKOLI arsh clinic opd improved 26-12-2018

grow opd, I strrictly

inform that outreach

programme

District yes District

Phc Khamari

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

Family planning Supare

Visan NSV, Camp

THO Bhandara, 10/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation & Family

Planning

PHC & SC Yes No

Phc Dhargaon

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

12/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation

PHC & SC Yes No

Phc Shahapur

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

20/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation

PHC & SC Yes No

Phc Mohadura

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

22-12-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation

PHC & SC Yes No

Phc Khamari

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

24-12-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation

PHC & SC Yes No

District Bhandara - THO Bhandara

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Phc Pahela

LCDC Supare visan &

Sprsh prog. , Phc & SC

Cleaning, GP Cleaning the

area of the Villege,Labour

room is not maintened

RCH Portal in Updation

26-12-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart timtable to mainted

Improvement of PHC &

SC Work,RCH Portal in

Updation

PHC & SC Yes No

Phc warthi, Jamb1 )RCH Protal Entry .

2)RCH Register Incoplete

Dr.M.P,THO Mohadi

01.12.18 Instruction Given Instruction Given YES PHC Level

PHC Kardi,1), ANC Registation

,PPIUCD Register Incoplete

Dr.M.P,THO Mohadi

12.12.18Instruction Given Instruction Given YES PHC Level

PHC Jamb, Sc-,KandriHMIS output not avalable,

vaccin Stock incomplet

Dr.M.P,THO Mohadi

17.12.18 Instruction Given Instruction Given YES PHC Level

PHC-Andhalgaon ,

1 )HMIS output not

avalable, 2PMMVY Yojana

Form

Dr.M.P,THO Mohadi

21.12.18 Instruction Given Instruction Given YES PHC Level

PHC Kardi,

EDD / EPD

Incompete,HMIS output not

avalable, vaccin Stock

incomplet

Dr.M.P,THO Mohadi

24.12.18Instruction Given Instruction Given YES PHC Level

PHC_Betala , 1) Vaccenation Coverge

,PPIUCD Register Incoplete

Dr.M.P,THO Mohadi

28.12.18 Instruction Given Instruction Given YES PHC Level

PHC Chullhad,SC -

Paraswada,Sihora

Partohraph,Water Qulity,SC

Delivery Poor Performace,

PMMVY Form Not

Updated Yr 2017-18 & 18-

19, MR Action Check

Dr. M.A. Quraishi THO

Tumsar (06.12.2018)Instrucation Given

PHC Chullhad,SC -

Paraswada,SihoraYES NO

District Bhandara - THO Tumsar

District Bhandara - THO Mohadi

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Nakadongari, SC -

Ashti,Lobhi

MR Action Check,Record

Not Updated, Stock Book

Not Updated,Delivery

performance Poor,PMMVY

Form Not Updated Yr 2017-

18 & 18-19

Dr. M.A. Quraishi THO

Tumsar (11.12.2018)Instrucation Given PHC Nakadongari, SC - Ashti,Lobhi YES NO

PHC Lendezari,SC -

Pitesur,Hardoli

MR Action Plan Check

,Delivery Per formance

Unstafactory,RCH Data

En.Poor,Lokpratinidhi

Report not Done,PMMVY

Form Not Updated Yr 2017-

18 & 18-19

Dr. M.A. Quraishi THO

Tumsar (15.12.2018)Instrucation Given PHC Lendezari,SC - Pitesur,Hardoli YES NO

PHC Dewhadi,SC -

Bhamani,Madgi

MR Action Plan

Check,Partohraph,Water

Qulity,SC Delivery Poor

Performace, PMMVY Form

Not Updated Yr 2017-18 &

18-19

Dr. M.A. Quraishi THO

Tumsar (24.12.2018)Instrucation Given PHC Dewhadi,SC - Bhamani,Madgi YES NO

PHC Gobarwahi,SC-

Mitewani,Mehegoan

MR Action Plan

Check,Record Not Updated,

Cash Book Not

Updated,JSY Form Not

Sumbited,PMMVY Form

Not Updated Yr 2017-18 &

18-19

Dr. M.A. Quraishi THO

Tumsar (26.12.2018)Instrucation Given

PHC Gobarwahi,SC-

Mitewani,MehegoanYES NO

PHC Dewahadi,SC-

Kharbi,Khapa

MR Action Plan

Check,Record Not Updated,

Cash Book Not

Updated,JSY Form Not

Sumbited,PMMVY Form

Not Updated Yr 2017-18 &

18-19

Dr. M.A. Quraishi THO

Tumsar (28.12.2018)Instrucation Given PHC Dewahadi,SC- Kharbi,Khapa YES NO

PHC Lendezari, SC -

Bagheda

MR Action Plan

Check,Record Not Updated,

Cash Book Not

Updated,JSY Form Not

Sumbited,PMMVY Form

Not Updated Yr 2017-18 &

18-19

Dr. M.A. Quraishi THO

Tumsar (31.12.2018)Instrucation Given PHC Lendezari, SC - Bagheda YES NO

Kondha PHC & SC

PPIUCD Work Very

Low,NHM Fund

Expenditure Very Low,MR

Traget not Achive,Iron

Sucros Register not

Maintain,Instruct for

PMMVY Forms.

THO Pauni,Dr.T.I.Ansari (

4 December 2018)

Instrucation given for

Impraement of Work.Block No

District Bhandara - THO Pauni

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Nishtti

Immunisation Session

Visit,Instruct for PMMVY

Forms,NCD Report not

Update.

Dr.T.I.Ansari (7 December

2018)

Instrucation given for

Impraement of Work.Block No

Wahi

Immunisation Session

Visit,Instruct for PMMVY

Forms,NCD Report not

Update.

Dr.T.I.Ansari ( 14

December 2018)

Instrucation given for

Impraement of Work.Block No

Bhuyar PHC

HMIS Validation

Committee Meeting not

Held at phc Level,NHM

Fund Expenditure Very

Low,Family Planning Work

Not Satisfied.

Dr.T.I.Ansari ( 15

December 2018)

Instrucation given for

Impraement of Work.Block No

Gose

Immunisation Session

Visit,RCH Portal Data

Entry not Update,NCD

Report not Update.

Dr.T.I.Ansari ( 18

December 2018)

Instrucation given for

Impraement of Work.Block No

Asgaon PHC

HMIS Validation

Committee Meeting not

Held at phc Level,NHM

Fund Expenditure Very

Low,Iron Sucros Register

not Compelet.

Dr.T.I.Ansari ( 19

December 2018)

Instrucation given for

Impraement of Work.Block No

Palora

Immunisation Session

Visit,RCH Portal Data

Entry not Update,NCD

Report not Update.

Dr.T.I.Ansari ( 21

December 2018)

Instrucation given for

Impraement of Work.Block No

Sawarla PHC

RKS Committee Meeting

not Held last two

Month,NHM Fund

Expenditure Very Low,Iron

Sucros Register not

Maintain Properly.

Dr.T.I.Ansari ( 26

December 2018)

Instrucation given for

Impraement of Work.Block No

Nerla SC

Pmmvy Register not

Maintain Properly ,RCh

Register not Complete,RCH

Portal Data Entry not

Complete.

Dr.T.I.Ansari ( 27

December 2018)

Instrucation given for

Impraement of Work.Block No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Khamba

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

THO Sakoli,12-01-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

PHC Yes No

PHC Sangadi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

12-04-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

PHC Yes No

PHC Ekodi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

12-06-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

PHC Yes No

SC Bodara

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

12-07-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

District Bhandara - THO Sakoli

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Gondumari

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

12-12-2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

PHC Yes No

SC Ekodi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

13/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

PHC Virshi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

14/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

PHC Yes No

SC Sasara

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

15/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Umari

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

17/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

SC Sendurwafa

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

18/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

SC Virshi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

24/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

SC Kinhi

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

28/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Satalwada

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

28/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

SC Palasgaon

PHC & SC Cleaning,RCH

Portal Updation Low

Percantgae ,GP Cleaning

the area of the

Villege,Labour room

,maintened ,HDP Camp

according to guidlines .

Cleliness not mainted,Cash

Book,Leger Book

Maintened

29/12/2018

Asked to modify the

labour room according to

Protocal & Guidline.

Prepared a cleanliness

chart time table to

mainted Improvement of

PHC & SC Work,Cash

Book & Legaer Book

SC Yes No

PHC POHARA

Medicin store

verification,lebour room

visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatimIncrease

Sputm collection &

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 daysinform Give

Information abour MR

CAMPINIAN

Block yes

sc kaneri

Increase Sc deliver

Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

sc jevnada

Increase Sc deliver

Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

District Bhandara - THO Lakhani

THO

Lakhani,Dr.S.S.Hatnagar06

/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC KESALWADA

Attend Rks meeting

Medicin store

verification,lebour room

visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatimIncrease

Sputm collection &

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 daysinform &

Attend Rks meeting Give

Information abour MR

CAMPINIAN

Block yes

SC GADEGAON

update Rch data entry

(profil entry,ec

entry),Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information &

Increase Sc deliver

Block yes

SC GARADA

update Rch data entry

(profil entry,ec

entry),Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information &

Increase Sc deliver

Block yes

PHC POHARA

Visit NSV Camp;increse

ppiucd, Medicin store

verification,lebour room

visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatim Increase

Sputm collection & Rch

data entry update

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 days Give

Information abour MR

CAMPINIAN

Block yes

SC MACHARNA

Increase Sc deliver Hbnc

visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

Dr.S.S.Hatnagar10/12/2018

Dr.S.S.Hatnagar07/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC KITADI

Increase Sc deliver Hbnc

visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

PHC SALEBHATA

Attend Rks meeting ;

increse ppiucd, Medicin

store verification,lebour

room visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatim Increase

Sputm collection & Rch

data entry update

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 days Give

Information abour MR

CAMPINIAN

Block yes

SC LAKHORI

visit maternet death

;Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child informatioN

& give informatin

PPIUCD to ANC Give

Information abour MR

CAMPINIAN

Block yes

SC SOMALWADA

visit maternet death

;Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child informatioN

& give informatin

PPIUCD to ANC

Block yes

Dr.S.S.Hatnagar10/12/2018

Dr.S.S.Hatnagar15/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC PIMPALGAON

Visit NSV Camp;increse

ppiucd, Medicin store

verification,lebour room

visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatim Increase

Sputm collection & Rch

data entry update

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 days Give

Information abour MR

CAMPINIAN

Block yes

SC MIREGAON

Increase Sc deliver

Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

SC SHIVANI

Increase Sc deliver

Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

PHC MURMADITUP

Visit NSV Camp;increse

ppiucd, Medicin store

verification,lebour room

visit ,protocalll &

emrgancy durge , give

information , lab visit &

chake mf7

Ragister,conteiner survay

Ragister ,sickle cell kit

informatim Increase

Sputm collection & Rch

data entry update

.Emtolocal survay,home

visite Anm,Mpw 100%

in 15 days Give

Information abour MR

CAMPINIAN

Block yes

Dr.S.S.Hatnagar18/12/2018

Dr.S.S.Hatnagar20/12/2018

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC KOLARI

Hbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec entry)

Block yes

AV.BHUGAON

/MENDHA

IHbnc visit, Health

Education,about school

dengu awarness,sam

mam child information

update Rch data entry

(profil entry,ec

entry)Give Information

abour MR CAMPINIAN

Block yes

PHC Dighori

1) Clening TimeTable Not

Maintaned

2) Tailet Bathroom Was

Dirty 3) MR Vaccination

Visit

Dr. Dr. N.A. Meshram

(THO Lakhandur) ,03-12-

2018

Action Taken in MO

PHCPHC Level By MO Yes No

SC Barwha

1) Movement Book Not

Proprly Maintened

2) MCTS Work is Poor

3) MR Vaccination Visit

05-12-2018Action Taken in MO

PHCSub Centrer Level By MO Yes No

PHC Sarandi, 1)Tailet Bathroom Was

Dirty 2) MR. Vaccination

Visit 10-12-2018

Protocals were make

them availablePHC Level By MO Yes No

SC Soni 1) Movement Book Not

Proprly Maintened

2) MCTS Work is Poor 11-12-2018Action Taken in MO

PHC

Sub Centrer Level By MO

Yes No

SC Bothali

1) Family Flaning Work

Poor

2) IUD Kit Not available

3) Movement Book Not

Proprly Maintened

14-12-2018Action Taken in MO

PHC

Facility level By MO

District level By DHO

SC Level By ANM

Yes No

SC Dahegaon 1) Regular ANM

Trasfered Out

2) MCTS Work Poor 18-12-2018

1) workplan generation

at facility level

2) inform to THO office

1) District Level By DHO 2)

Block Level By THO

Yes No

SC Bhagdi

1) R-15 Register Not

Properly Fill

2) Stock Register not Fill

Properly

3) Delivery Work Low

21-12-2018Action Taken in MO

PHCSub Centrer Level By MO Yes No

SC Jaitpur

1) Stock Registar not

Complet Fill

2) Dots Form not Fullfil

28-12-2018Action Taken in MO

PHCPHC Level Yes No

Dr.S.S.Hatnagar20/12/2018

District Bhandara - THO Lakhandur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Goregaon Block. PHC

Kawalewada,SC Gidhadi,

SC Kalimati, SC DawwaMR Visit 1) Vaccination

was done according to

guildlines 2) tally sheet

were entered properly 3)

rest room for beneficiarys

was available

DPM,Ms.Archana

Wankhede 01/12/2018

Discuss this with school

teacher and vaccination District Level Yes No

Goregaon Block. SC

gondekhari, borgaon,

pathari, bhutaitola,

katangi, ambetalao

MR Visit 1) Vaccination

was done according to

guildlines 2) tally sheet

were entered properly 3)

rest room for beneficiarys

was available

Ms.Archana Wankhede

04/12/2018

Discuss this with school

teacher and vaccination District Level Yes No

Moorgaon Arjuni Block.

PHC Keshori

Pre assessment of NQAS 1)

clenliness was manintend 2)

All protocols were present

as per guidelines 3) BMW

management according

guidelines

Ms.Archana Wankhede

06/12/2018

discused with ANM and

respective MO &

instructed to well prepare

for NQAS teem.

Institute Level by resspective ANM

& MO and StaffsYes No

RH Salekasa

RH Visite..RH Is very

Pathatic condition no

cleanness at all.given

Febarsindurri and HLL

Reporting formate.

Ms.Archana Wankhede

12/12/2018

Discuss with MS

regarding fulfillment of

NQAS requirement

Institute Level by resspective ANM

& MO and StaffsYes Yes

PHC Kati,Kasa

Visit to RH Rajegaon and

tell to them abot

Febarsinduri reporting and

HLL reporting. And discuss

about hospital indicator

with Their Staff

Ms.Archana Wankhede

13/12/2018

Discountineation

proposal of ANM District Level Yes No

THO Saleakasa

1) All financial document

well properly 2) taluka

saniyantran & Samnay

samiti meeting registers was

not availeble during visit

Ms.Archana Wankhede

17/12/2018

Discuss with TMO

regarding this matterDistrict Level Yes No

RH RajegaonRH Visit regarding SSS and

discuss with MS

Ms.Archana Wankhede

19/12/2018

Discuss this matter with

JE & Dept. E. & CEO

ZP,Gondia

District Level (JE)

Gondia Block PHC Kati,

Amgaon Block SC Birsi

Inquiry was conducted

regarding Shobha Bohre 1)

She was not stay at head

quarter 2) Beneficiarys was

not satified with her

behaour 3) She has

produced fake reporting

regading delivery

Ms.Archana Wankhede

20/12/2018

Discuss this matter with

JE & Dept. E. & CEO

ZP,Gondia

District Level (JE)

District Gondia - DPM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH TiroraVisit to sdh Tirora For

NQAS Checklist Prepration

Ms.Archana Wankhede

24/12/2018

discuss with MS & Clerk

regardin proper

maintanance of record

MS level Yes Yes

PHCBhanpur

1) check the HWC branding

2) PHC monthly metting

was gouing on 3) instructed

health staff regarding

fulfillment of target

Ms.Archana Wankhede

31/12/2018

discuss with vaccinator

& other staff at MR

session

District Level Yes Yes

RH Salekasa

PHC Bhanpur consruction

is going on.inspection was

done.check financial

records.

Mr Sanket Morghare DAM

12/12/2018

Discuss with MO advice

to updates all recordPHC Level yes

RH Rajegaon

VISIT at PHC Soni MO

was present at visit

time.Records not

updates.checking financial

record .record not maintain

properly

Mr Sanket Morghare DAM

13/12/2018

Discuss with MOadvice

to updates all recordPHC Level yes

RH Amgaon

check the stock ragister, and

also check cashbook. Told

abou Audit information..all

fianacial document

Mr Sanket Morghare DAM

19/12/2018

Discuss with MOadvice

to updates all recordPHC Level yes

PHC Kakodi,Tho Office

Goregaon

Visit to PHC kakodi to see

new ly constructed building

Inspection.and also Maher

Ghar inspection.

Mr Sanket Morghare DAM

20/12/2018

Discuss with MOadvice

to updates all recordPHC Level yes

DHO Office

Month dec 2018 present in

officeabout MR reporting

complience in office

Mr.Ukadas R.Bisen

(District M&E officer)

3/10/2018

MR reporting

complience in officeDHO office no No

Goregaon Block. PHC

SoniMR Visit

Dr.Meena.Watti

Dist Ayush Officer

1/12/2018

Discuss with District level Yes NO

Goregaon Block. PHC

Tilli/MohgaonMR Visit

Dr.Meena.Watti

Dist Ayush Officer

4/12/2018

Discuss with CS RMO institute level yes No

Goregaon Block. PHC

SoniMR Visit

Dr.Meena.Watti

Dist Ayush Officer

6/12/2018

Discuss with CS and

RMOinstitute level yes No

RH Salekasa

RH Visite..RH Is very

Pathatic condition no

cleanness at all.given

Febarsindurri and HLL

Reporting formate.

Dr.Meena.Watti

Dist Ayush Officer

7/12/2018

Discuss with DHO and

DRCHOinstitute level yes No

District Gondia - DAM

District Gondia - M&E OFFICER

District Gondia - Dist.Ayush Officer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Rajegaon

Visit to RH Rajegaon and

tell to them abot

Febarsinduri reporting and

HLL reporting. And discuss

about hospital indicator

with Their Staff

Dr.Meena.Watti

Dist Ayush Officer

12/12/2018

advise to prepare

dacuments for kayakalp

assesmen

institute level yes No

RH RajegaonRH Visit regarding SSS and

discuss with MS

Dr.Meena.Watti

Dist Ayush Officer

13/12/2018

Discuss with DHO and

DRCHODistrict level yes No

RH Amgaon

Visit RH Amgaon Discuss

with their MO Regarding

LSCS. And also discuss

about barsinduri reporting

and HLL reporting.

Dr.Meena.Watti

Dist Ayush Officer

19/12/2018

Discuss with CS RMO District level yes No

PHC Kakodi,Tho Office

Goregaon

Inspection New Building

and then come to THO

Office Goregaon and

attainding MR Meeting

Dr.Meena.Watti

Dist Ayush Officer

20/12/2018

Discuss with CS RMO District level yes No

SDH TiroraVisit to sdh Tirora For

NQAS Checklist Prepration

Dr.Meena.Watti

Dist Ayush Officer

24/12//2018

Discuss with CS RMO District level yes No

PHCBhanpur

Visit to PHC Bhanpur

reguarding ayush

dispensary reporting .and

kayakalp .

Dr.Meena.Watti

Dist Ayush Officer

31/12/2018

Discus with THO

goregaon and DRCHO

for issue.

District level yes No

Goregaon Block. PHC

SoniMR Visit

Dr Swarnarekha

Upadhyay IPHS

Coordinator

1/12/2018

Discuss wirh DRCHO institute level yes No Pending

Goregaon Block. PHC

Tilli/MohgaonMR Visit

Dr Swarnarekha Upadhyay

IPHS Coordinator

4/12/2018

Discuss wirh DRCHO institute level yes No Pending

Goregaon Block. PHC

SoniMR Visit

Dr Swarnarekha Upadhyay

IPHS Coordinator

6/12/2018

Discuss wirh DRCHO institute level yes No Pending

RH Salekasa

RH Visite..RH Is very

Pathatic condition no

cleanness at all.given

Febarsindurri and HLL

Reporting formate.

Dr Swarnarekha Upadhyay

IPHS Coordinator

7/12/2018

Discuss with MS and

RMOinstitute level No RH

RH Rajegaon

Visit to RH Rajegaon and

tell to them abot

Febarsinduri reporting and

HLL reporting. And discuss

about hospital indicator

with Their Staff

Dr Swarnarekha Upadhyay

IPHS Coordinator

12/12/2018

Discuss with MS institute level yes RH

RH RajegaonRH Visit regarding SSS and

discuss with MS

Dr Swarnarekha Upadhyay

IPHS Coordinator

13/12/2018

Discuss with DPM institute level No, on goning RH

District Gondia - IPHS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH Amgaon

Visit RH Amgaon Discuss

with their MO Regarding

LSCS. And also discuss

about barsinduri reporting

and HLL reporting.

Dr Swarnarekha Upadhyay

IPHS Coordinator

19/12/2018

Discuss with MS institute level No, on goning RH

PHC Kakodi,Tho Office

Goregaon

Inspection New Building

and then come to THO

Office Goregaon and

attainding MR Meeting

Dr Swarnarekha Upadhyay

IPHS Coordinator

20/12/2018

Discuss with Junior

Engineer THO goregaoninstitute level yes Dist

SDH TiroraVisit to sdh Tirora For

NQAS Checklist Prepration

Dr Swarnarekha Upadhyay

IPHS Coordinator

24/12/2018

Discuss with DPM institute level yes SDH

PHC BhanpurInspection for New

Building

Dr Swarnarekha Upadhyay

IPHS Coordinator

31/12/2018

Discuss with Junior Engineer institute level yes Dist

Goregaon Block. PHC

Soni

Visit to PHC Dhabepauni

,Gothangaon,PHC Keshori ,

reguarding sicklecell NGO

work supervision orderd by

DHO .

Swapna Khandait

RKS/SCD

Coordinator1/12/2018

Discuss with DRCHO,

and drugware incharge.MMU Level, and PHC Level No PHC level

Goregaon Block. PHC

Tilli/Mohgaon

Visit to PHC Bangaon

.Cleanliness is there.MO

dispensary was present at

VISIt time as incharge

MO.Asking about Sicklecell

NGO Volenteers jobchart.

Visit to patients and ask

about disease ans

voleenteers visit to patients.

Swapna Khandait

SCD/RKS Coordinator

04/12/2018

Discuss with MO PHC Level No PHC level

SDH Tirora Visit to SDH Tiroda

Swapna Khandait

SCD/RKS Coordinator

24/12/2018

Sickle cell NGOAttend meeting about

rporting and sckle cell target

Swapna Khandait

SCD/RKS Coordinator

29/12/2019

Discuss with NGO

President and whole staffNGO level NO No

Visit TO PHC Thana

Reguarding ASHA Pro.Visit to PHC ASHA record

& payment verify

ASHA Coordinator,Sanjay

Donode 04/12/2018

Discuss with MO

Discuss with mo

regarding asha payment

Institute level No No

Visit TOTHO Tiroda

Reguarding ASHA Pro.Visit to THO ASHA record

& payment verifySanjay Donode 5/12/2018

Discuss with THO,

BCMDiscuss with mo

regarding ashaC

Institute level No No

Visit TO PHC Tilli Moh

Reguarding ASHA Pro.Visit to PHC ASHA record

& payment verifySanjay Donode 14/12/2018

Discuss with MO

Discuss with mo

regarding asha payment

Institute level No No

District Gondia - RKS & Co-ordinator

District Gondia -

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Visit TOPHC Morwahi

Reguarding MR Pro. Visit to THO MR record

verifySanjay Donode 18/12/2018

Discuss with MO

regarding MR Pro. Institute level No No

Visit TO PHC Kurhadi

Reguarding ASHA Pro. Visit to PHC ASHA record

& payment verifySanjay Donode 24/11/2018

Discuss with MO & BF

regarding asha payment ..Institute level No No

RH SalekasaVisit For Kayakalp Peer

Assissessment with Team

Jyoti SawarkarDQAC

Programme Assistant

3/12/18

SDH,RH Level

No

PHC level

RH RajegaonVisit For NQAS Central

Assessment with Team

Jyoti SawarkarDQAC

Programme Assistant

13/12/18

PHC Level

No

PHC level

SDH TiroraVisit For NQAS Central

Assessment with Team

Jyoti SawarkarDQAC

Programme Assistant

24/12/18

PHC Level

No

PHC level

Adv. Rekha Kantode

Sapate

In Slp case. No 36/2015

Rakesh Singh Vs Dr. Sanjay

Jaiswal

Adv. Rekha Kantode

Sapate, Legal Counsellor,

KTS Gondia ,04-12-2018

No Need District Level,No Need No

Adv. Rekha Kantode

Sapate

In Cr. Case No 448/2013

State Vs Minabai Sorele14-12-2018 No Need District Level ,No Need No

Adv. Rekha Kantode

Sapate

Executive Meeting At Zilla

Parishad15-12-2018 No Need District Level ,No Need No

Adv. Rekha Kantode

Sapate

Counsellor Training at

Training Institute Zilla

Parisha

16/12/2018,17/12/2018 No Need District Level ,No Need No

Adv. Rekha Kantode

Sapate

State of Maharashta Vs Dr

Omprakash Chitarkha 22-12-2018 No Need District Level ,No Need No

Adv. Rekha Kantode

Sapate

State of Maharashta Vs Dr

Rajesh Likhar27-12-2018 No Need District Level ,No Need No

District Gondia - QA Co.

District Gondia - Lagarl Counsetp

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Adv. Rekha Kantode

Sapate Review Meeting at pune 29-12-2018 No Need District Level ,No Need No

Adv. Rekha Kantode

Sapate Sonography Inspection 12/12/2018, 15/12/2018 No Need District Level,No Need No

PHC Gothangaon, SC

Gothangaon, SC Mungali,

SC Nawegaonbandh

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

Taluka Health Office

Arjuni Mor.,12/12/2018 &

10.30 AM

Shri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

PHC Mahagaon,SC

Itkheda,SC Mahurkuda,

SC Morgaon

Measle Rubela Lasikaran ,

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

13/12/2018 & 11.00 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

PHC Korambhitola, SC

Arjuni 1 & 2 , SC

Kormbhi, SC

Korambhitola

Measle Rubela Lasikaran ,

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

15/12/2018 & 10.30 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

PHC Channabakti, SC

Tadgaon, SC Dongargaon,

SC Bondgaon,SC Silezari

Measle Rubela Lasikaran ,

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

17/12/2018 & 11.30 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

District Gondia - Arjuni Mor.,

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Dhabepawani, SC

Zasinagar, SC Pawani &

SC Kanholi

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

18/12/2018 & 10.30 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

PHC Channabakti, SC

Pimpalgaon, SC Mungali

,SC Bhivkhidaki

Measle Rubela Lasikaran ,

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

20/12/2018 & 10.30 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

GondiaRCH Portal & HMIS

Software Training26/12/2018 & 08.30 AM

Shri D.B.Bokade,

Programme Assistant

PHC Keshori, SC Keshori,

SC Chicholi, SC ParastolaMeasle Rubela Campain 27/12/2018 & 10.30 AM

Shri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

PHC Channabakti, SC

Bondgaondevi

PMMVY Form, IMR &

MMR Verification, RCH

Portal Entry, Child

Registration, ANC

Registration , JSY

Beneficiery Adhar Number

& Account Number and

Other Records Verify

28/12/2018 & 09.30 AMShri D.B.Bokade,

Programme AssistantYes

Block and By

THOYes

NRHM Office ,GondiaStatutory Audit

Compaliance01/12/2018 & 09.10 AM

Shri S.S.Tiwari Block

AccountantYes

PHC Dhabepauni, PHC

Gothangaon

Cash Book, Update jsy

beneficiery in RCH Portal,

Maher Ghar , Manav Vikas

Programme and Other

Records Verify

03/12/2018 & 10.15 AMShri S.S.Tiwari Block

AccountantYes

Block and By

THOYes

NRHM Office ,Gondia Councurrent Audit

Compaliance05/12/2018 & 09.40

Shri S.S.Tiwari Block

AccountantYes

NRHM Office Gondia Office Work & SBI Challan 10/12/2018 & 09.30 AMShri S.S.Tiwari Block

AccountantYes

District Gondia - Block Auuountant

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

THO Office Sadak Arjuni PFMS Problem 12/12/2018 & 01.30 PMShri S.S.Tiwari Block

AccountantYes

Collector office, Gondia Commissioner Meeting 1312/2018 &09.30AMShri S.S.Tiwari Block

AccountantYes

CEO Office ,GondiaExecutive Committee

Meeting15/12/2018 & 08.30AM

Shri S.S.Tiwari Block

AccountantYes

DHO office, Gondia Arogya Samiti Meeting 17/12/2018 & 10.30 PMShri S.S.Tiwari Block

AccountantYes

Sc Navegaon, SC Mungli,

SC Kholi

Cash Book, Update jsy

beneficiery in RCH Portal,

Maher Ghar , Manav Vikas

Programme and Other

Records Verify

19/12/2018 & 01.10 PMShri S.S.Tiwari Block

AccountantYes

Block and By

THOYes

NRHM Office Gondia BPMU & PHC Staff Salary 20/12/2018 & 09.15 AMShri S.S.Tiwari Block

AccountantYes

RH Navegaonbandh

Cash Book, Update jsy

beneficiery in RCH Other

Records Verify

21/12/2018 & 10.30 AMShri S.S.Tiwari Block

AccountantYes

Block and By

THOYes

NRHM Office Gondia PFMS Staff Salary Quiery 24/12/2018 & 9.25 AMShri S.S.Tiwari Block

AccountantYes

PHC Gothangaon, SC

Dhabetekadi

Cash Book, Update jsy

beneficiery in RCH Portal,

Maher Ghar , Manav Vikas

Programme and Other

Records Verify

26/12/2018 & 09.30 AMShri S.S.Tiwari Block

AccountantYes

Block and By

THOYes

PHC Keshori, PHC

Channabakti

Cash Book, Update jsy

beneficiery in RCH Portal,

Maher Ghar , Manav Vikas

Programme and Other

Records Verify

27/12/2018 & 10.30 AMShri S.S.Tiwari Block

AccountantYes

Block and By

THOYes

NRHM Office, Gondia PIP Re-apropration 29/12/2018 & 10.30 AMShri S.S.Tiwari Block

AccountantYes

PHC Gothangaon Village-

Kawatha, Dongargaon,

Navegaon/ Bandh BAD

School

MR Campaign Vaccination

Site Supervission Viist 01/12/2018 & 11.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

District Gondia - DCM

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC-Channa/Bakti

Pimpalgaon, Siregaon

Bandh, Phc-Dhabeapauni

Village- Navegaon/ Bandh

& Ranjitola

MR Campaign Vaccination

Site Supervission Viist 02/12/2018 & 10.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

KTS GondiaPMMVY Programme Video

Conference06/12/2018 & 08.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

Yes

PHC Keshori Village

Ilada & Knhalgaon

PMMVY form information

of ASHA, VHNSC , Asha

HBNC Form Check &

LBW Child Visit

10/12/2018 & 11.00 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

Z.P.GondiaFamily Planing (FPLM)

Training12/12/2018 & 08.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

Yes

PHC Mahagaon Village

Itkheda & Phc-

Korambhitola Village

Asoli & Gaurnagar

MR Vaccination Campaign

Supervission & Asha visit

& PMMVY Benefisharies

Form Check

13/12/2018 & 10.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

PHC channa/Bakti,Village

Nimgaon & Aratatondi

MR Campaign Vaccination

Site Viist & PMMVY Form

Curies Clean up.

18/12/2018 & 10.00 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

PHC Keshori Village

Chicholi

SC Visit For VHNSC &

Asha Record Check up &

Anganwadi Visit For

VHNSC Acc.No.

19/12/2018 & 11.00 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

PHC Mahagaon Village

Butai & Siroli

Asha Record Check, HBNC

Form Check & LBW Child

Visit Immunization Session

Visit

21/12/2018 & 10.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

PHC channa/Bakti

Asha monthly Meeting &

PFMS Payment For Asha

Nov 2018

24/12/2018 & 10.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

PHC Korambhitola Sc-

Dhabetekadi

Healtha Camp Visit &Asha

PMMVY Work Check26/12/2018 & 11.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

YesBlock and By

THOYes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Z.P.GondiaASHA Yojana Review

Meeting28/12/2018 & 08.30 AM

Shri Z.B.Gaykwad Block

Community Mobilizer

(Asha)

Yes

RH SALEKASA

inj.Lignocain,inhaler

Beclomethasone,Pressure

infusion bag,Extension IV

lines are not available.

EMS

COORDINATOR,3.12.201

8

Discussed with

108MO,DM,CS sir District Level yes No

RH NAWEGAON

BANDH

inj.Noradrenaline,inj.Nitrog

lycerine,Inhalor

Beclomethasone,Inhalor

Salbutamol,inj.Lignocaine,i

nj.Amiadarone,inj.Paraceta

mol,Tab.Aspirine are not

available.Stock register is

incomplete.

4.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH ARJUNI MOR

inj.Dopamine,inj.Hydrocarti

sone,Inhalor

Solbutamol,Inhalor

Beclomethasone,Tab.Aspiri

ne,inj.Nalaxone HCL ,Mini

Tracheostomy

kit,Rightangle sheivel

connector,inj.Morphine.inj.

Fentanyl are not

available.Stock register is

incomplete.

5.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH GOREGAON

inj.Calcium

carbonate,inj.Etofylline,inj.

Pheniramine

maleate,inj,Lignocain,inj.K

CL,Inhaler

Beclomethasone,inj.Amiada

rone,inj.Paracetamol

,syp.Paracetamol are not

available.search light is not

in working condition.

7.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

District Gondia - EMS Co-ordinator

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH CHICHGAD

Mistdress spray,vinodine

spray,inj.Noradrenaline,inj.

atropine,inj.Hydrocortisone,

inj.Paracetamol,inj.KCL,inj.

Nitroglycerine are not

available.Inhaler

Beclomethasone,Inhaler

Salbutamol,inj.Sodium

valporate,syp.Paracetamol

are not available. Search

light is not in working

condition.

10.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH RAJEGAON

Micopore,Mini

Tracheostomy

kit,Rightangled Shivel

Connector,inj,KCL are not

available.Stock register is

incomplete.

13.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH SALEKASA

inj.Lignocain,inhaler

Beclomethasone,Pressure

infusion bag,Extension IV

lines are not available.

14.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH GOREGAON

inj.Calcium

carbonate,inj.Etofylline,inj.

Pheniramine

maleate,inj,Lignocain,inj.K

CL,Inhaler

Beclomethasone,inj.Amiada

rone,inj.Paracetamol

,syp.Paracetamol are not

available.search light is not

in working condition.

17.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH SADAK ARJUNI

Antiseptic solution,Teeth

guard is not

available.Cervical coller is

broken.

17.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH DEORI

inj.Adrenaline,inj.Calcium

carbonate,inj.Lignocain,inj.

Mannitol,Inj.KCL,inj.Sodiu

m

valporate,Inj.Dopamine,inj.

dobutamine,Paracetamol,inj

.Frusemide,Activated

charcoal,syp.Paracetamol,in

j.Paracetamol,inj.Amiadaro

ne are not available.Search

light is not in working

condition.

18.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

RH AMGAON

Providine iodine

solution,Pain

spray,inj.Noradrenaline,inj.

Nitroglycerine,inj.Diazepam

,inj.Magnesium

sulphate,Inj.KCL,Syp.Parac

etamol,inj.Calcium

carbonate,inj.Dopamine,inj.

Dobutamine,inj.Nalaxone

HCL are not available.

18.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH NAWEGAON

BANDH

inj.Noradrenaline,inj.Nitrog

lycerine,Inhalor

Beclomethasone,Inhalor

Salbutamol,inj.Lignocaine,i

nj.Amiadarone,inj.Paraceta

mol,Tab.Aspirine are not

available.Stock register is

incomplete.

19.12.2018Discussed with

108MO,DM,ZM,CS Sir District Level yes No

RH ARJUNI MOR

inj.Dopamine,inj.Hydrocarti

sone,Inhalor

Solbutamol,Inhalor

Beclomethasone,Tab.Aspiri

ne,inj.Nalaxone HCL ,Mini

Tracheostomy

kit,Rightangle sheivel

connector,inj.Morphine.inj.

Fentanyl are not

available.Stock register is

incomplete.

19.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

PHC EKODI

inj.Calcium

carbonate,inj.Dopamine,inj.

KCL,inj.Lignocain,inj.Parac

etamol,inj.Frusemide,Tab.Is

osorbide dinitrate,Mini

Tracheostomy kit,Nasal

airway and

catheters,Pressure infusion

bags,Rightangled shivel

connector are not available.

22.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

KTSH GONDIA

Cervical coller is

broken.syp.Paracetamol,Inh

alor

Beclomethasone,inj.Morphi

ne,inj.Fentanyl are not

available.

26.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

BGWH GONDIA

EMT shears is not

available.Search light is not

in working

condition..inj.Dopamine,inj.

Dobutamine,inj.Noradrenali

ne are not available.

26.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH CHICHGAD

Mistdress spray,vinodine

spray,inj.Noradrenaline,inj.

atropine,inj.Hydrocortisone,

inj.Paracetamol,inj.KCL,inj.

Nitroglycerine are not

available.Inhaler

Beclomethasone,Inhaler

Salbutamol,inj.Sodium

valporate,syp.Paracetamol

are not available. Search

light is not in working

condition.

27.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

PHC DAWWA

Pain

spray,inj.Dopamine,inj.Dob

utamine,inj.Noradrenaline,i

nj.Nitroglycerine,inj.KCL,T

ab.Isosorbide

Dinitrateare,syp.Paracetamo

l,inj.Paracetamol are not

available.Search light is not

available.stock book is

incomplete.

28.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

SDH TIRODA

inj.Dopamine,inj.Mannitol,i

nj.Diazepam,Inhalor

Beclomethasone are not

avaialble.stock book is

incomplete.

29.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

RH SOUNDAD

Providine iodine

solution,inj.Etofylline,inj.K

CL,inj.Lignocain,Extension

IV lines,Micropore,Mini

Tracheostomy kit are not

available.

31.12.2018Discussed with

108MO,DM,CS Sir District Level yes No

GhuggusMRVC planning in

Vidhya Vihar School

Dr.Prakash Sathe,

DHO, Dt.01/12/2018MRVC plannig Block level

Ghuggus

MRVC planning in

Mount Carmel

Academy

Dr.Prakash Sathe,

DHO, Dt.03/12/2018MRVC plannig Block level

District Chandrapur - DHO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Warora, Kosarsar

TMO/PHC visit, review

of National programs,

planning of Rubella

program, FP camp

review meeting

Dr.Prakash Sathe,

DHO, Dt.04/12/2018

Visit, review and

meetingBlock level

Nagpur EPS office meetingDr.Prakash Sathe,

DHO, Dt.05/12/2018Attend meeting --

Ghuggus

Innogration of MRVC

program in Mount

Carmel Academy

Dr.Prakash Sathe,

DHO, Dt.06/12/2018MRVC Campaign Block levele

Ghuggus, Majri, Kosarsar MRVC verificationDr.Sandip Gedam, DRCHO,

01/12/2018MRVC Block level

Ghuggus Innogration function and

St.Marry School inspection

Dr.Sandip Gedam, DRCHO,

03/12/2018

Attending innogration and

inspectionBlock level

Bhadrawati, Warora,

KosarsarMRVC verification

Dr.Sandip Gedam, DRCHO,

07/12/2018MRVC Block level

Rajura, Dewada, Kadholi MRVC verificationDr.Sandip Gedam, DRCHO,

13/12/2018MRVC Block level

Ghuggus PHC visitDr.Sandip Gedam, DRCHO,

17/12/2018Visit & review Block level

SFWB Pune NID WorkshopDr.Sandip Gedam, DRCHO,

19/12/2018Attend WS --

Wadhona, Talodhi, Balapur MRVC verificationDr.Sandip Gedam, DRCHO,

26/12/2018MRVC Block level

SFWB Pune PIP reappropriation meetingDr.Sandip Gedam, DRCHO,

29/12/2018Attend meeting --

Nagpur EPF meetingShri.Shriniwas Mulawar,

DPM, 05/12/2018Attend meeting --

DDHS Nagpur Division meetingShri.Shriniwas Mulawar,

DPM, 18/12/2018Attend meeting --

Nagpur Nagpur ZP office for Dy

Engg. Additional Charge

Nilesh Khade

Dy. Engineer

01.12.2018

Nagpur office work

Nagpur Nagpur ZP office for Dy

Engg. Additional Charge

Nilesh Khade

Dy. Engineer

03.12.2018

Nagpur office work

District Chandrapur - DRCHO

District Chandrapur - DPM

District Chandrapur - Dy.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Phc Sirsi, Nagpur For Site Inspection.

Nilesh Khade

Dy. Engineer

06.12.2018

site visit for Inspection of

Sirsi PHC

PHC-saori For Site Inspection.

Nilesh Khade

Dy. Engineer

07.12.2018

Inspection of Finishing

work

Nagpur Nagpur ZP office for Dy

Engg. Additional Charge

Nilesh Khade

Dy. Engineer

10.12.2018

site visit to MCH wing

Daga

PHC Gangalwadi Inspection of site work

Nilesh Khade

Dy. Engineer

11.12.2018

Inspection of phc main

building brick work &

Type II qtr plinth level

work

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

12.12.2018

EE office work

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

13.12.2019

EE office work

PHC-Tadali, Saori SC-

Chinchala, For Site Inspection.

Nilesh Khade

Dy. Engineer

17.12.2018

Inspection of Finishing

work

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

18.12.2018

EE office work Site visit

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

20.12.2018

EE office work Site visit

Mumbai state office

Nilesh Khade

Dy. Engineer

24.12.2018

submission of tender file

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

27.12.2018

EE office work Site visit

Nagpur Nagpur ZP office for EE

Additional Charge

Nilesh Khade

Dy. Engineer

31.12.2018

EE office work Site visit

PHC Gangalwadi Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

01.12.2018

Inspection of phc main

building brick work &

Type II qtr plinth level

work

PHC Tadali & SC chinchala Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

03.12.2018

Inspection of Finishing

work

Bembal phc Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

04.12.2018

Inspection of Site work

District Chandrapur - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Saori Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

05.12.2018

Inspection of Finishing

work

Nagpur EE office Nagpur

Dhiraj D. kasarlewar

Junior Engineer

07.12.2018

Laqshya Estimate checking

PHC Gangalwadi Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

10.12.2018

Inspection of phc main

building brick work &

Type II qtr plinth level

work

Ngbhid BTT Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

12.12.2018

Inspection of Site work

PHC Saori Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

15.12.2018

Inspection of Finishing

work

Bembal phc Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

18.12.2018

Inspection of Site work

Nagpur EE office Nagpur

Dhiraj D. kasarlewar

Junior Engineer

21.12.2018

Laqshya Estimate checking

& Taking TS

PHC Gangalwadi Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

24.12.2018

Inspection of phc main

building brick work &

Type II qtr plinth level

work

Mumbai Meeting state office Mumbai

Dhiraj D. kasarlewar

Junior Engineer

26.12.2018

Monthly Review Meeting

PHC Saori Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

27.12.2018

Inspection of Finishing

work

PHC Gangalwadi Inspection of site work

Dhiraj D. kasarlewar

Junior Engineer

30.12.2018

Inspection of phc main

building plaster work &

Type II qtr Lintel level

work

HFWTC,PUNE

1)NCD CBAK Form

Ragistration In NCD

SOFTWARE 2) Patients

Identification & Provide

Health Service 3)

NcdSoftware Related In

ANM,Mo

Ku. Sheetal V. Rajapure,

Dcm (ASHA Yojna).

7/12/2018 To 8/12/2018

Training On NCD

PROGRAMME

SOFTWARE

District Yes No

SDH Mul Nil

Ku. Shweta Ainchwar (DPS

RBSK)

01/12/2018

Nil Nil YES Block Level

District Chandrapur - RBSK Co.

District Chandrapur - Jr.Engineer

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SDH Mul Nil

Ku. Shweta Ainchwar (DPS

RBSK)

05/12/2018

Nil Nil YES Block Level

SDH Mul Nil

Ku. Shweta Ainchwar (DPS

RBSK)

06/12/2018

Nil Nil YES Block Level

SDH Mul Nil

Ku. Shweta Ainchwar (DPS

RBSK)

10/12/2018

Nil Nil YES Block Level

visit to warora for

sonography center

inspection

Inspected sonography center

with medical suprintendant

Chandrapur PCPNDT Legal

Advisor,04-12-2018NIL NIL NIL NIL

visit to shindewahi for

sonography center

inspection

Inspected sonography center

with medical suprintendant 19-12-2018 NIL NIL NIL NIL

visit to ballarpur and

gadchandur for

sonography center

inspection

Inspected sonography center

with medical suprintendant 20-12-2018 NIL NIL NIL NIL

visit to Pune for review meeting 29-12-2018 NIL NIL NIL NIL

RH Rajura MR Campaign Reporting

Chandrapur ARSH

Coordinator,Yogita

Ambekar 04-12-218

- CS Level Yes 4

RH RajuraARSH Clinic Visit.MR

Campaign Reporting

Yoogita Ambekar 05-12-

2018- CS Level Yes

RH RajuraARSH Clinic Visit.MR

Campaign Reporting

Yoogita Ambekar 06-12-

2018- CS Level Yes

SDH Warora Outreach ProgrammYoogita Ambekar 08-12-

2019- CS Level Yes

SC -Manora

1) PMMVY data entry not

done

2)Rch data entry not done

3) SC Parisar no clean

Updated

Ballarpur THO,Dr. Prakash

M. Nagrale 3/12/2018 yes SC NO at ANM level

PHC-Visapur

1) RCH data entry not done

2) PMMVY data entry not

done

3)injection vids was not

dispojed

Dr. Prakash M. Nagrale

3/12/2018 yes PHC NOat MO phc

level

District Chandrapur - PCPNDT Legal Advisor

District Chandrapur - ARSH Coordinator

District Chandrapur - THO Ballarpur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC kothari

1) RCH data entry not done

2)PHC ward was not clean

3) Anm was absent

Dr. Prakash M. Nagrale

3/12/2018 yes PHC NOat MO phc

level

SC -Bamni

1 RCH data entry not done

2}SC over all work ok

3) PMMVY data entry not

done

Dr. Prakash M. Nagrale

3/12/2018 yes SC NO at ANM level

Sivni SC/Grampanchant

2 RCH data entry not done

2}SC over all work ok

3) PMMVY data entry not

done

Dr. Prakash M. Nagrale

3/12/2018 yes Grampanchant Yes at bdo level

SC- Palasgaon

1 pmmvy data entry not

done

2}SC over all work ok

3)PMMVY data entry not

done

Dr. Prakash M. Nagrale

3/12/2018 yes SC NO at ANM level

SC- Nandgaon

1 RCH data entry done

updation done

2}SC over all work ok

2) stock book not Updated

Dr. Prakash M. Nagrale

3/12/2018 yes SC NO at ANM level

Daheli-Grampanchant

1)Clorination Rejistar not

updeted

2}bleeching pouder is no

3) ot valu purification

investication

Dr. Prakash M. Nagrale

3/12/2018 yes Grampanchant Yes at bdo level

kothari-Grampanchant

1)Clorination Rejistar not

updeted

2}bleeching pouder is no

3) ot valu purification

investication

Dr. Prakash M. Nagrale

3/12/2018 yes Grampanchant Yes at bdo level

PHC kothari

1)Cash book not updated

2) stock book not Updated

3) soe & uc not Submit

Shri Prakash vitthal gaurkar

ACCOUNTANT

3/12/2018

- PHC NO -

PHC kothari

1) soe & uc not submit

2)audit compalaince no

submit

3) stock book not Updated

Shri Prakash vitthal gaurkar

ACCOUNTANT

06/12/2018

- PHC NO -

PHC kalmana

1) Cash book not updated

2)audit compalaince no

submit

3) soe & uc not Submit

Shri Prakash vitthal gaurkar

ACCOUNTANT

12/12/2018

- PHC NO -

District Chandrapur - Accountant Ballarpur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC kalmana

1) Cash book not updated

2) stock book not Updated

3) soe & uc not Submit

Shri Prakash vitthal gaurkar

ACCOUNTANT

19/12/2018

- PHC NO -

sc manora

1)Cash book not updated

2) stock book not Updated

3) soe & uc not Submit to

phc

Shri Prakash vitthal gaurkar

ACCOUNTANT

21/12/2018

- sc NO -

PHC-Visapur

1) RCH data entry not done

2) HMIS-report

3) PMMVY data entry not

done

Kanta Narayan Bhagat data

Oferator 01/12/2018 - phc NO -

PHC- kothari

1) RCH data entry not done

2) HMIS- report

3)PMMVY data entry not

done

Kanta Narayan Bhagat data

Oferator 13/12/2018 - PHC NO -

SC Manora

1) RCH data entry not done

2) DHIS-2 report

3) PMMVY data entry not

done

Kanta Narayan Bhagat data

Oferator 15/12/2018 - SC NO -

SC Palasgaon

1) RCH data entry not done

2) DHIS-2 report

3) PMMVY data entry not

done

Kanta Narayan Bhagat data

Oferator 18/12/2018 SC NO -

PHC-Visapur

1) RCH data entry not done

2) HMIS- report

3)3) PMMVY data entry

not done

Kanta Narayan Bhagat data

Oferator 19/12/2018 - phc NO -

PHC-Kalmana

1) RCH data entry not done

2) HMIS-2 report

3)3) PMMVY data entry

not done

Kanta Narayan Bhagat data

Oferator 29/12/2018 - PHC NO -

PHC-Kalmana

1) RCH data entry not done

2) HMIS- report

3) PMMVY data entry not

done

Kanta Narayan Bhagat data

Oferator 31/12/2018 - PHC NO -

Navi Daheli

1) Asha Record

2) Asha HBNC Visit

3) Asha Visit

Ballarpur BCM,Madhuri

Eknath Bhure 07/12/2018- SC NO

Kawdajai

1) Asha Record

2) Asha HBNC Visit

3) Asha Visit

Madhuri Eknath Bhure

11/12/2018- SC NO

Kinhi

1) Asha Record

2) Asha HBNC Visit

3) Asha Visit

Madhuri Eknath Bhure

15/12/2018- SC NO

Aamdi

1) Asha Record

2) Asha HBNC Visit

3) Asha Visit

Madhuri Eknath Bhure

20/12/2018SC NO

District Chandrapur - BCM Ballarpur

District Chandrapur - DEO Ballarpur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Visapur

1) Asha Record

2) Asha Monthly Meeting

3)Asha HBNC VISIT

Madhuri Eknath Bhure

24/12/2018PHC NO

Kothari

1) Asha Record

2) Asha Monthly Meeting

3)Asha HBNC VISIT

Madhuri Eknath Bhure

26/12/2018PHC NO

PHC Clines

PHC Premises area not

clean & Urgently take

action

Labour Room Protocal

Labour Room Protocol

follow as per Govt.

norms

Medicine Store Room

Medicine Store room

clean and maintain stock

record

PHC Clines

PHC Premises area not

clean & Urgently take

action

Labour Room Protocal

Labour Room Protocol

follow as per Govt.

norms

Medicine Store Room

Medicine Store room

clean and maintain stock

record

PHC Clines

PHC Premises area not

clean & Urgently take

action

Labour Room Protocal

Labour Room Protocol

follow as per Govt.

norms

Medicine Store Room

Medicine Store room

clean and maintain stock

record

PHC Clines

PHC Premises area not

clean & Urgently take

action

Labour Room Protocal

Labour Room Protocol

follow as per Govt.

norms

Medicine Store Room

Medicine Store room

clean and maintain stock

record

PHC Clines

PHC Premises area not

clean & Urgently take

action

Labour Room Protocal

Labour Room Protocol

follow as per Govt.

norms

Medicine Store Room

Medicine Store room

clean and maintain stock

record

PHC-Mudza, SC-WandraDr.V. V. Dudhapachare

15/12/2018

SC-Torgaon bk, SC-

Kaleta

Dr.V. V. Dudhapachare

19/12/2018Block Level YES

PHC-Mendki, SC-EkaraDr.V. V. Dudhapachare

12/12/2018Block Level YES

PHC-Chaugan,SC-

Maldongari

Dr.V. V. Dudhapachare

13/12/2018Block Level YES

District Chandrapur - THO Bramhapuri

PHC-ArherNavargaon,

SC-Sondri

THO Bramhapuri,Dr.V. V.

Dudhapachare

06/12/2018

Block Level YES

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Audit Information

All documents will be

prepread for Concrant

Audit

Cash Book UpdationCashbook will be

completed before audit

Manav Vikas MissionCash book not completed

& given by cheque

Lock Book Updation Lock book not completed

sc cash book

U/F AMG fund exp. But

cash book not update

2016-17 & 2017-18.

fund collect but not

Audit Information

All documents will be

prepread for Concrant

Audit

Cash Book UpdationCashbook will be

completed before audit

Manav Vikas MissionCash book not completed

& given by cheque

Lock Book Updation Lock book not completed

sc cash book

U/F AMG fund exp. But

cash book not update

2016-17 & 2017-18.

fund collect but not

Audit Information

All documents will be

prepread for Concrant

Audit

Cash Book UpdationCashbook will be

completed before audit

Manav Vikas MissionCash book not completed

& given by cheque

Lock Book Updation Lock book not completed

sc cash book

U/F AMG fund exp. But

cash book not update

2016-17 & 2017-18.

fund collect but not

MCTS Workplan

Generation

MCTS Mother & Child

Workplan Not generate

in propar Date

DHIS-2 Data Correction Instruct to DHIS-2 Data

Correction

PHC-Chaugan,SC-

Maldongari

Shri. S.M. Khobragade

12/12/2018Block Level NO

SC-Torgaon bk, SC-

Kaleta

Shri. S.C. Shahare

17/12/2018

District Chandrapur - DEO Bramhapuri

PHC-Mudza, SC-WandraShri. S.C. Shahare

14/12/2018

PHC Level Yes

PHC Level Yes

District Chandrapur - Accountant Bramhapuri

PHC-Chaugan,SC-

Maldongari

Shri. S.C. Shahare

12/12/2018Block Level Yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Delivary Point Delivary rate is low as

per norms

MCTS Data UpdationInstruct to Mothly

MCTS Data Updation

DHIS-2 Data Correction Instruct to DHIS-2 Data

Correction

Cleanness Aware to Premises

cleanness

MCTS Workplan

Generation

MCTS Mother & Child

Workplan Not generate

in propar Date

DHIS-2 Data Correction Instruct to DHIS-2 Data

Correction

Delivary Point Delivary rate is low as

per norms

B. F. not signed on Asha's

record register

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

bad concelling by asha to

people

Instruct Asha that doing

a better concelling to

people

Found expired medicine

Instruct Asha that

destryed the medicene

whenever medicine

expired

HBNC form not filled

properlly

Asha not maintained record

regulery

bad concelling by asha to

people

HBNC form not filled

properlly

PHC-Mendki, SC-

Ranbothali

Shri. S.D. Mahadole

12/12/2018

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

PHC Level yes

PHC-ArherNavargaon,

SC-Pimpalgaon

Shri. S.D. Mahadole ,BCM

Bramhapuri

5/12/2018

SC. Level yes

PHC-Chaugan, SC-

Maldongari

Shri. S.D. Mahadole

6/12/2018

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

PHC & SC Level yes

PHC-Gangalwadi, SC- RuiShri. S.M. Khobragade

19/12/2018PHC Level NO

District Chandrapur - BCM Bramhapuri

PHC-Chaugan,SC-

Maldongari

Shri. S.M. Khobragade

12/12/2018Block Level NO

SC-Torgaon bk, SC-KaletaShri. S.M. Khobragade

17/11/2018PHC Level NO

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Asha not maintained record

regulery

bad concelling by asha to

people

TB patient followed

regularlly but patient not

caring himself

TB follow up card was not

updated

On ASHA Record Register

was not sign

HBNC form not filled

properlly

Asha not maintained record

regulery

bad concelling by asha to

people

PHC Chichpalli, PHC

Durgapur

1) Check RCH Register

2) PHC Building Inspection

3) EDD & EPD Line List

not Displayed

Chandrapur THO ,DR

Madhuri Meshram

THO

01/12/2018

EDD EPD list display

within 3 days

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Borda, SC Nagala cash book not update

DR Madhuri Meshram

THO

04/12/2018

cashbook update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Kolsa Record seen & verify

DR Madhuri Meshram

THO

07/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

District Chandrapur - THO Chandrapur

PHC Mudza, SC-HaldaShri. S.D. Mahadole

18/12/2018

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

PHC Level yes

PHC-Gangalwadi, SC-

Baradkinhi

Shri. S.D. Mahadole

13/12/2018

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

PHC Level yes

PHC-Mendki, SC-

Ranbothali

Shri. S.D. Mahadole

12/12/2018

Instruct to B.F. that she

was meet to Asha each

& every time, checked

the Asha's record register

& sighn it.

PHC Level yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Durgapur, SC

BhataliRecord seen & verify

DR Madhuri Meshram

THO

11/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

SC Durgapur 3, SC

BhataliRecord seen & verify

DR Madhuri Meshram

THO

12/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Ghuggus, SC

Ghuggus 1, 2, 3, 4

Cash Book & Vehicle log

book not update

DR Madhuri Meshram

THO

13/12/2018

cashbook & vehicle log

book update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Pandharkawada, SC

Sakharwahi

1) SC Untied voucher not

update 2)

cash book not update

DR Madhuri Meshram

THO

14/12/2018

record update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Marda, SC Nakoda,

PHC GhuggusRecord seen & verify

DR Madhuri Meshram

THO

15/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Tadali, SC

Yashwantnagar

1) Check RCH Register

2) Cashbook not Update

DR Madhuri Meshram

THO

18/12/2018

Cashbook update within

2 days

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Morwa, SC Dewada

1) JSY Record verify

2) RCH ANC Registration

not complete

DR Madhuri Meshram

THO

19/12/2018

JSY Updated & RCH

Data entry completed

within 3 days

ACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Chichpalli, SC

Nagala

1-Log Book Not Update

2-Financial Records not

sufficient

3-Delivery Room Not clean

DR Madhuri Meshram

THO

20/12/2018

log book updated,

suggest delivery room

clean

ACTION TAKEN AT PHC LEVEL

BY MOYES

SC Kolsa, SC Junona Record seen & verify

DR Madhuri Meshram

THO

21/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Ghuggus, PHC

TadaliRecord seen & verify

DR Madhuri Meshram

THO

26/12/2018

record updatedACTION TAKEN AT PHC LEVEL

BY MOYES

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Pipari, SC Marda1) Cashbook not update

2) JSY Record veriry

DR Madhuri Meshram

THO

27/12/2018

cashbook update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Chichpalli, PHC

Durgapur, SC Bhatali

1) Cashbook not update

2) JSY Record veriry

DR Madhuri Meshram

THO

28/12/2018

cashbook update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Durgapur, SC

Bhatali, SC Padmapur

1) Cashbook not update

2) JSY Record veriry

DR Madhuri Meshram

THO

29/12/2018

cashbook update within 3

days

ACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Ghuggus, SC

Ghuggus 1, 2, 3, 4

1) JSY Record verify & jsy

check not issue to

beneficieries

Ku. Jayanjali Meshram

Acct.

11/12/2018

JSY Record Updated &

jsy check issued to

beneficieries within 3

days

PHC & SC Level YES

PHC Durgapur, SC

Padmapur

1) RKS Balancesheet not

update

2) notesheet & voucher not

prepared

3) Record not update

Ku. Jayanjali Meshram

Acct.

12/12/2018

Balance sheet updated &

fixed assit register update

update within 5 days

PHC & SC level YES

PHC Tadali, SC

YashwantnagarRecord seen & verify

Ku. Jayanjali Meshram

Acct.

13/12/2018

record updated SC level YES

SC Pandharkawada, SC

Pipari

1) JSY Record verify & jsy

check not issue to

beneficieries

Ku. Jayanjali Meshram

Acct.

15/12/2018

JSY Record Updated &

jsy check issued to

beneficieries within 3

days

PHC & SC level YES

SC Nagala, SC Borda Record seen & verify

Ku. Jayanjali Meshram

Acct.

18/12/2018

record updated PHC & SC Level YES

PHC Durgapur, PHC

Chichpalli

1) RKS Balancesheet not

update

2) notesheet & voucher not

prepared

3) Record not update

Ku. Jayanjali Meshram

Acct.

19/12/2018

Balance sheet updated &

fixed assit register update

update within 5 days

SC level YES

SC Kolsa, SC Junona

1) JSY Record verify & jsy

check not issue to

beneficieries

Ku. Jayanjali Meshram

Acct.

21/12/2018

Record updated & jsy

check issued to

beneficieries within 7

days

SC level YES

District Chandrapur - Accountant Chandrapur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Ghuggus, SC

NakodaRecord seen & verify

Ku. Jayanjali Meshram

Acct.

24/12/2018

record updated PHC & SC level YES

SC Marda, SC PipariRecord seen & verify,

Cashbook not update

Ku. Jayanjali Meshram

Acct.

27/12/2018

Cashbook updated within

3 daysSC level YES

PHC Ghuggus, SC

Ghuggus 1, 2, 3, 4

RCH Data Entry not

complete

Sandeep M. Moon

DEO

01/12/2018

RCH Entry complete

within 5 daysPHC & SC Level YES

PHC Durgapur, SC

Bhatali

1) RCH ANC Registration

not complete

2)JSY Register & RCH

register chek

Sandeep M. Moon

DEO

11/12/2018

RCH Registration

complete within 8 daysPHC & SC Level YES

PHC Tadali, SC

Yashwantnagar

1) RCH ANC Registration

not Update

Sandeep M. Moon

DEO

12/12/2018

RCH ANC update within

8 daysPHC & SC Level YES

PHC Chichpalli, SC

Junona

RCH Child Updation not

complete

Sandeep M. Moon

DEO

14/12/2018

RCH Child updation

within 6 daysPHC & SC Level YES

SC Sakharwahi, SC

Yashwantnagar

1 . RCH ANC & Infant

Registration not complete &

not Update

Sandeep M. Moon

DEO

18/12/2018

ANC & Infant

Registration complete &

Update within 7 days

SC level YES

PHC Chichpalli, PHC

Durgapur

1 . RCH ANC Registration

not complete & not Update

Sandeep M. Moon

DEO

20/12/2018

ANC Registration

complete & Update

within 7 days

PHC & SC Level YES

SC Borda, SC Nagala1) RCH Data entry not

complete

Sandeep M. Moon

DEO

21/12/2018

RCH ANC Registration

complete wihin 6 daysPHC & SC Level YES

PHC Ghuggus, PHC

Tadali

1) RCH Bank & Adhar &

ANC not complete

Sandeep M. Moon

DEO

26/12/2018

RCH Data entry

complete within 6 daysSC level YES

District Chandrapur - DEO Chandrapur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Pandharkawada, SC

Sakharwahi

RCH ANC & Child Entry

not update

Sandeep M. Moon

DEO

27/12/2018

RCH ANC & Child entry

update within 6 daysPHC Level YES

PHC Bhisi

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 01/12/2018

informed to do Sanitation

& RKS EC GB Meeing

Planing

Facility Yes

SC Bamni

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 03/12/2018MR Supervision Facility Yes

PHC Neri

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 04/12/2018

informed to do Sanitation

& RKS EC GB Meeing

Planing

Facility Yes

Gadgaon

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 05/12/2018MR Supervision Facility Yes

PHC Jambhulghat

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 06/12/2018

informed to do Sanitation

& RKS EC GB Meeing

Planing

Facility Yes

PHC Shankarpur

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 13/12/2018

informed to do Sanitation

& RKS EC GB Meeing

Planing

Facility Yes

PHC Jambhulgat

1) Sanitation was Not done

2) not Plan RKS EC & GB

Meeting

Dr. D. S. Meshram

Date 26/12/2018

informed to do Sanitation

& RKS EC GB Meeing

Planing

Facility Yes

1) Referral Registers is not

updated

2) RKS GB & EC Meetings

not Arrange

Shri. T. G. Wankhede

Date 11/12/2018

informed to updated

record & Referral

Registers updeted & pay

to jsy benefit

Facility Yes

PHC Neri

1) RKS GB & EC Meetings

not Arrange

2) Free Diet Registers is not

updated

3) RKS GB & EC Meetings

not Arrange

Shri. T. G. Wankhede

Date 13/12/2018

Referral Registers

updeted & Conduct RKS

EC Meetings

Facility Yes

PHC Shankarpur

1) RKS GB & EC Meetings

not Arrange

2) Free Diet Registers is not

updated

3) RKS GB & EC Meetings

not Arrange

Shri. T. G. Wankhede

Date 15/12/2018

Referral Registers

updeted & Conduct RKS

EC Meetings

Facility Yes

District Chandrapur - THO Chimur

District Chandrapur - Accountant Chimur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Khadsangi

1) Referral Registers is not

updated

2) RKS GB & EC Meetings

not Arrange

Shri. T. G. Wankhede

Date 21/12/2018

Referral Registers

updeted & Conduct RKS

GB & EC Meetings

Facility Yes

PHC Neri

1) Record was not Updeted

2) Referral Registers is not

updated

3) NRHM Grant not

distribut to SC & VHNS

Shri. T. G. Wankhede

Date 27/12/2018

Referral Registers

updeted & Conduct RKS

GB & EC Meetings

Facility Yes

PHC Bhisi

1) Record was not Updeted

2) Referral Registers is not

updated

3) NRHM Grant not

distribut to SC & VHNS

Shri. T. G. Wankhede

Date 29/12/2018

Referral Registers

updeted & Conduct RKS

GB & EC Meetings

Facility Yes

PHC Masal

1) MCTS Was Not done

2) Child Death Audit was

not complited.

Shri. K. T. Gedekar

Date 12/12/2018

informed to complete

RCH Mother & Child

Data entry

Facility Yes

PHC Jambhulghat

1) MCTS Was Not done

2) Village wise register

were not filled.

Shri. K. T. Gedekar

Date 15/12/2018

informed to complete

RCH Mother & Child

Data entry and told to

update Adhar & Bank

Detaile

Facility Yes

PHC Khadsangi

1) MCTS Was Not done

2) Child Death Audit was

not complited.

Shri. K. T. Gedekar

Date 18/12/2018

informed to complete

RCH Mother & Child

Data entry and told to

update Adhar & Bank

Detaile

Facility Yes

PHC Neri

1) MCTS Was Not done

2) Village wise register

were not filled.

Shri. K. T. Gedekar

Date 20/12/2018

informed to complete

RCH Mother & Child

Data entry and told to

update Adhar & Bank

Detaile

Facility Yes

PHC Shankarpur

1) MCTS Was Not done

2) Child Death Audit was

not complited.

Shri. K. T. Gedekar

Date 24/12/2018

informed to complete

RCH Mother & Child

Data entry and told to

update Adhar & Bank

Detaile

Facility Yes

PHC Shankarpur

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 05/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Neri

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 11/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Masal

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 17/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Jambhulghat

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 19/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

District Chandrapur - BCM Chimur

District Chandrapur - DEO Chimur

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Khadsangi

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 26/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Neri

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 27/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Bhisi

1) HBNC From Not

Updated

2) LBW Child Not reffred

to PHC Leval

Ku. D. S. Rohankar

Date 29/12/2018

informed to HBNC From

Updated ASHA &

Informed to Reffred Low

birth baby to PHC

Facility Yes

PHC Tohogaon

1) Financial Recard Update

2)log book not update

3)Cleanliness not

satisfactoryDr. Nagrade 01/12/.2018

Instruction given to

Medical OfficerBlock Facility yes

PHC DHABA

1) Stock Book not update

2)Budit Majuri not clear

recard

3)cash book Update Dr. Nagrade 07/12/.2018

Instruction given to

Medical OfficerBlock Facility yes

SC NANDVARDHAN

1) )Sub center Billding Not

working

2)Cleanliness not

satisfactory

3) poor Contener suervey

Dr. Nagrade 11/12/2018Instruction given to

ANM& MPWBlock Facility yes

B. Talohdi

1) water pump not working

2)Cleanliness not

satisfactory

3)Not Payment of Budit

Majuri

Dr. Nagrade 13/12/2018Instruction given to

ANMBlock Facility yes

SC LATHI

1) water pump not working

2)Cleanliness not

satisfactory

3)Not Payment of Budit

Majuri

Dr. Nagrade 15/12/2018Instruction given to

ANM& MPWBlock Facility yes

SC Kharalpeth/wadoli

1) Sc Building is all poor

condition

2)recard book not update

3)Cleanliness not

satisfactory

Dr. Nagrade 18/12/2018Instruction given to

ANMBlock Facility yes

SCLathi

1) Sc Building is all poor

condition

2)recard book not update

3)Cleanliness not

satisfactory

Dr. Nagrade 20/12/2018Instruction given to

ANMBlock Facility yes

District Chandrapur - THO Gondpipri

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC DHABA

1) Cash book not update

2)MCtS Date Entry not

Update

3) Stock book not avilable

Dr. Nagrade 26/12/2018Instruction given to

ANMBlock Facility yes

SC WEDGAON

1) Stock Book not update

2)Budit Majuri not clear

recard

3) MANV Vikas camp is

report in not porvaid

Dr. Nagrade 31/12/2018Instruction given to

ANMBlock Facility yes

DHABA PHC

1) Stock Book not update

2) finacial Recard update

3) Vehical lag book not

done

Bajrang G. Gedam

01/12/2018

Instruction given to

Medical OfficerBlock leval yes -

TOHOGAON PHC

1) Log book not upda

2)Cash book not apdet

Given

3) Fix Assed Rajister Not

apdet

Bajrang G. Gedam

05/12/2018

Instruction given to

Medical OfficerBlock leval yes -

TOHOGAON PHC

1) Jsy Payment not done

2) finacial Recard Not

update

3) JSY Payment Bank

Diteles Givan

Bajrang G. Gedam

11/12/2018

Instruction given to

ANMBlock leval yes

DHABA PHC

1) Log book not update

2) finacial Recard update

3) Stock Book not update

Bajrang G. Gedam

15/12/2018

Instruction given to MO

& Ju. ClerkBlock leval yes

DHABA PHC

1) Log book not update

2) finacial Recard update

3) Stock Book not update

Bajrang G. Gedam

18/12/2018

Instruction given to MO

& Ju. ClerkBlock leval yes

TOHOGAON PHC

1) Log book not update

2) finacial Recard update

3) Stock Book not update

Bajrang G. Gedam

21/12/2018

Instruction given to MO

& Ju. ClerkBlock leval yes -

Lathi

1) Jsy benifisari bank ditesl

not given

2) finacial Recard update

3) Stock Book not update

Bajrang G.

Gedam26/12/2018

Instruction given to

ANMBlock leval yes

District Chandrapur - Accountant Gondpipri

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

TOHOGAON PHC

1) Stock Book not update

2) finacial Recard update

3) JSY Payment Bank

Diteles Givan

Bajrang G. Gedam

28/12/2018

Instruction given to MO

& Ju. ClerkBlock leval yes

sc Nandwardhan

1) Stock Book not update

2) finacial Recard update

3) JSY Payment Bank

Diteles Givan

Bajrang G. Gedam

31/12/2018

Instruction given to

ANMBlock leval yes

phc-Dhaba

1) 1)very few Institutional

Delivery 2)

very few Maher Ghar

Institutional Delivery

3Jsy Ragister Recard Not

Update

Bhawana N. Sangade

01/12/2018

Instruction given to

ANM Block Facility No

phc-Tohogaon

1)very few Institutional

Delivery 2)

very few Maher Ghar

Institutional Delivery

3Iron sucroz Ragister

Recard Not Update

Bhawana N. Sangade

02/12/2018

Instruction given to

ANMBlock Facility No

sc-Lathi

1)very few Institutional

Delivery

2) EPP-EDD calender not

propary Display

3)RCH Ragister not update

Bhawana N. Sangade

11/12/2018

Instruction given to

ANMBlock Facility No

phc-Tohogaon

1) EPP-EDD calender not

propary Display

2) very few Institutional

Delivery

3)Recard Not Update

Bhawana N. Sangade

14/12/2018

Instruction given to

ANMBlock Facility No

phc-Tohogaon

1)very few Institutional

Delivery

2)JSY Not paid Benificiris

3)Cleanliness not

satisfactory

Bhawana N. Sangade

18/12/2018

Instruction given to

ANMBlock Facility No

phc dhaba

1) very few RCh entry

2) Maher ghar rigishrtar

Not Complite 3)Recard

Not Update

Bhawana N. Sangade

20/12/2018

Instruction given to

ANMBlock Facility No

District Chandrapur - DEO Gondpipri

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

sc-Nandwardhan

1)R15-R 16 ragister Recard

Child Not Update

2)Cleanliness not

satisfactory

3)Jsy Ragister verificetion

Bhawana N. Sangade

24/12/2018

Instruction given to

ANMBlock Facility yes

phc-Tohogaon

1) EPP-EDD calender not

propary Display

2) very few Maher Ghar

Institutional Delivery

3Iron sucroz Ragister

Recard Not Update

Bhawana N. Sangade

29/12/2018

Instruction given to

ANMBlock Facility No

PHC Jiwati

1- RCH DATA ENTRY NOT

COMPLETED

2-DELIVERY ROOM NOT

CLEAN 3-RECORDS

NOT PROPERLY FILLED

THO Dr. Bansod 05-

12-2018YES PHC YES

kumbezari

1- RCH DATA ENTRY NOT

COMPLETED

3-RECORDS NOT PROPER

14-12-18 YES SC YES

Shedwahi

1-MHIS/DHIS WORKBOOK

NOT FILL PROPERLY

2- WATER SUPPLY NOT

SUFFICIENT 3-

ELECTRICITY NOT

SUFFICIENT

14-12-18 YES SC YES

Lambori

1- REGISTER WERE NOT

COMPLETE 2- DELIVERY

ROOM IS NOT CLEAN 3-

ASHA REGISTER NOT

COMPLETE

14-12-18 YES SC YES

Wani

1- HMIS /DHIS BOOKLET

NOT FILLED PROPERLY

2- MCTS DATA ENTRY

NOT COMPLETED

20-12-18 YES SC YES

kekezari

1-REGISTER NOT

COMPLETED

2-BROKEN COMPOUND

WALL 3-DHIS

BOOKLET NOT

COMPLETED

20-12-18 YES SC YES

District Chandrapur -THO Jiwati

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Patan

1- RCH DATA ENTRY NOT

COMPLETED

2-DELIVERY ROOM NOT

CLEAN 3-RECORDS

NOT PROPERLY FILLED

05-12-18 YES SC YES

Shengaon

1-WATER SUPPLY NOT

SUFFICIENT 2-

FINANCIAL RECORDS NOT

SUFFICIENT

3-DELIVERY ROOM NOT

CLEAN

27-12-18 YES SC YES

Nandappa

1-SISTER NOT PRESENT

2-REGISTER NOT

COMPLETED 3-

RECORDS NOT

COMPLETED

27-12-18 YES SC YES

Paramdoli

1) Verify RCH Data Entry

2) Verify HMIS/DHIS Data

Entry

3) Avalability Eqvipment &

Instrument

DEO- Vijay Dakre 11-

12-2018YES PHC NO

Nokewada

1) Verify RCH Data Entry

2) Verify HMIS/DHIS Data

Entry

3) Avalability Eqvipment &

Instrument

11-12-18 YES SC NO

kekezari

1-SOME RECORDS NOT

AVAILABLE

2-REGISTER NOT

COMPLETED 3-

VHNSC REGISTER NOT

COMPLETE

18-12-18 YES SC YES

kumbezari

1-REGISTER NOT

COMPLETED

2-BROKEN COMPOUND

WALL 3-ASHA

FINANCIAL RECORDS NOT

AVAILABLE

18-12-18 YES SC YES

Wani

1-WATER SUPPLY NOT

SUFFICIENT 2-

FINANCIAL RECORDS NOT

SUFFICIENT

18-12-18 YES SC YES

District Chandrapur - DEO Jiwati

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Patan

1) Verify RCH Data Entry

2) Verify HMIS/DHIS Data

Entry

3) Avalability Eqvipment &

Instrument

20-12-18 YES SC YES

Hirapur

1-SOME RECORDS NOT

AVAILABLE

2-REGISTER NOT

COMPLETED

27-12-18 YES SC YES

Shengaon

1-WATER SUPPLY NOT

SUFFICIENT 2-

PHYSICAL RECORDS NOT

SUFFICIENT

3-DELIVERY ROOM NOT

CLEAN

27-12-18 YES SC YES

Nadappa

1-SISTER NOT COME FOR

RCH 2-

INCOMPLETE MCTS

REGISTER 3-

DELIVERY ROOM NOT

CLEAN

27-12-18 YES SC YES

Paramdoli

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

BCM- Rajeshwar Bhagat

11-12-2018

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

PHC yes NO

Nokewada

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

11-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

kekezari

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

18-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

kumbezari

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

18-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

District Chandrapur - BCM Jiwati

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

Wani

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

18-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

PHC Patan

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

20-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

Hirapur

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

27-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

Shengaon

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

27-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

Nadappa

1) Verify Asha Record

Maintainance

2) AshaImmunization Session

3) BF Visit At home leval &

Asha HBNC Visit

27-12-18

1)Inform Asha to update

thair record & MCTS no

(2) BF to take visit at

bebeficerise level 3) Give

update about HBNC to

Asha

SC yes NO

PHC Naranda

1- RCH DATA ENTRY NOT

COMPLETED

2-DELIVERY ROOM NOT

CLEAN 3-RECORDS

NOT PROPERLY FILLED

THO Dr. Bansod 03-

12-2018YES

ACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Mandwa

1- RCH DATA ENTRY NOT

COMPLETED

2-DELIVERY ROOM NOT

CLEAN 3-RECORDS

NOT PROPER

03-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Bakhardi

1-DHIS/HMIS WORKBOOK

NOT FILL PROPERLY

2- WATER SUPPLY NOT

SUFFICIENT 3-

ELECTRICITY NOT

SUFFICIENT

11-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

District Chandrapur - THO Korpana

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Kodshi

1- REGISTER WERE NOT

COMPLETE 2- DELIVERY

ROOM IS NOT CLEAN 3-

ASHA REGISTER NOT

COMPLETE

21-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Lakhmapur

1- DHIS/HMIS BOOKLET

NOT FILLED PROPERLY

2- RCH DATA ENTRY NOT

COMPLETED

11-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Wansadi

1-REGISTER NOT

COMPLETED

2-BROKEN COMPOUND

WALL 3-DHIS

BOOKLET NOT

COMPLETED

15-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Korpana

1-REGISTER NOT

COMPLETED

2-BROKEN COMPOUND

WALL 3-DHIS

BOOKLET NOT COMPLETE

15-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Matha

1-WATER SUPPLY NOT

SUFFICIENT 2-

FINANCIAL RECORDS NOT

SUFFICIENT

3-DELIVERY ROOM NOT

CLEAN

28-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

SC Piparda

1-SISTER NOT PRESENT

2-REGISTER NOT

COMPLETED 3-

RECORDS NOT

COMPLETED

28-12-2018 YESACTION TAKEN AT PHC LEVEL

BY MOYES

PHC Naranda

1-FINANCIAL RECORDS

NOT SUFFICIENT

2-VHNSC REGISTER

NOT COMPLETE 3-

WATER SUPPLY NOT

SUFFICIENT

ACC-Abdul Bari 05-

12-2018YES ACTION TAKEN AT PHC LEVEL BY MO YES

PHC Virur gadegaon

1-WATER SUPPLY NOT

SUFFICIENT 2-

IMMUNISATION

SESSION NOT DONE

PROPERLY

05-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

District Chandrapur - Accountant Korpana

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Korpana

1-FINANCIAL RECORDS

NOT SUFFICIENT

2-VHNSC REGISTER

NOT COMPLETE 3-

WATER SUPPLY NOT

SUFFICIENT

13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Wansadi

1-ASHA FINANCIAL

RECORDS NOT

AVAILABLE

13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Pipari

1-SOME RECORDS NOT

AVAILABLE

2-REGISTER NOT

COMPLETED 3-

VHNSC REGISTER NOT

COMPLETE

13-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Bhoygaon

1-REGISTER NOT

COMPLETED

2-BROKEN COMPOUND

WALL 3-ASHA

FINANCIAL RECORDS

NOT AVAILABLE

19-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Antargaon

1-WATER SUPPLY NOT

SUFFICIENT 2-

FINANCIAL RECORDS

NOT SUFFICIENT

19-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Yergavhan

1-SISTER NOT PRESENT

2-REGISTER NOT

COMPLETED 3-

RECORDS NOT

COMPLETED

24-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

SC Piparda

1-SOME RECORDS NOT

AVAILABLE

2-REGISTER NOT

COMPLETED

24-12-2018 YES ACTION TAKEN AT PHC LEVEL BY MO YES

PHC Naranda1-DELIVERY BENEFITS

NOT GIVEN TO ASHA

BCM-Sandip Kamble

05-12-2018YES

ACTION TAKEN AT PHC LEVEL BY

MOYES

PHC Virur gadegaon1-DELIVERY BENEFITS

NOT GIVEN TO ASHA05-12-2018 YES

ACTION TAKEN AT PHC LEVEL BY

MOYES

SC Korpana

1-ASHA FINACIA

REGISTER NOT DONE

PROPERLY

13-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

District Chandrapur - BCM Korpana

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Wansadi

1-ASHA REGISTER NOT

COMPLETE 2-

DELIVERY BENEFITS NOT

GIVEN TO ASHA

13-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

SC Pipari

1-RECORDS NOT

COMPLETE 2-CO

ORDINATION WITH ASHA

NOT GOOD

13-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

SC Bhoygaon1-SISTER NOT PRESENT

2-SC WAS LOCKED19-12-2018 YES

ACTION TAKEN AT PHC LEVEL BY

MOYES

SC Antargaon

1-ASHA REGISTER NOT

COMPLETE 2-

DELIVERY BENEFITS NOT

GIVEN TO ASHA

19-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

SC Yergavhan

1-SISTER NOT PRESENT

2-REGISTER NOT

COMPLETED

24-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

SC Piparda

1-INCOMPLETE ASHA

REGISTER

2-ASHA IMMUNISATION

SESSION NOT AVALAIBE

24-12-2018 YESACTION TAKEN AT PHC LEVEL BY

MOYES

PHC Rajoli & SC

Kosambi

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 04 /12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

PHC & SC Level Yes

PHC Chiroli & SC

Junasurla

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 06 /12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

PHC & SC Level Yes

PHC Maroda & SC

Chimda

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 11 /12/2018

1. Instruct to Mothly

RCHData Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

SC Level Yes

PHC Chiroli & PHC

Bembal

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 12 /12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

SC Level Yes

District Chandrapur -THO Mul

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Chichala & SC

Nandgaon

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 14 /12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

SC Level Yes

PHC Bembal & SC

Yergaon

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 26/12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

PHC Level Yes

PHC Chiroli & SC Kelzar

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Dr. S. K. Meshram

Dt. 28/12/2018

1. Instruct to Mothly

RCH Data Updation

2. Instruct to Physical

Record Updated

3. Instruction to MR

Compain

PHC Level Yes

PHC Bembal & SC

Rajgad

1. Financial Record Updated

2. Physical Record Updated Shri. D.D. Tekulwar

Dt. 10 /12/2018

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

PHC Level YES

PHC Rajoli & SC

Dongargaon

1. Financial Record Updated

2. Physical Record UpdatedShri. D.D. Tekulwar

Dt. 14/12/2018

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

PHC Level YES

PHC Chiroli & SC Janala

1. Financial Record Updated

2. Physical Record UpdatedShri. D.D. Tekulwar

Dt. 17/12/2018

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

PHC Level YES

SC Nandgaon & SC

Junasurla

1. Financial Record Updated

2. Physical Record UpdatedShri. D.D. Tekulwar

Dt. 19/12/2018

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

PHC Level YES

SC Chichala & SC

Bhejgaon

1. Financial Record Updated

2. Physical Record UpdatedShri. D.D. Tekulwar

Dt. 21/12/2016

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

3. Instruction to MR

Compain

PHC Level YES

PHC Maroda & SC

Chimda

1. Physical Record Updated

3. Cleanness

Shri. D.D. Tekulwar

Dt. 28/12/2018

1. All Records will be

prepread

2. Instruct to Mothly RCH

Data Updation

3. Instruction to MR

Compain

PHC Level YES

District Chandrapur - Accountant Mul

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Bembal & SC

Rajgad

1. RCH Workplan Generation

2.RCH Due date & DHIS 2

updated

3. Physical Record Updated

Shri. A.N. Adkine

Dt. 06/12/2018

1. Instruct to Mothly rch

Data Updation

2. Instruct to DHIS-2 Data

Correction

3. Instruct to PMMVY PHC Level YES

PHC Chiroli & SC Kelzar

1. RCH Workplan Generation

2. Physical Record Updated

3. Delivary Point

4.pmmvy Updated

Shri. A.N. Adkine

Dt. 11/12/2018

1. Instruct to Mothly RCH

Data Updation

2. Instruct to DHIS-2 Data

Correction

3. Instruct to PMMVY PHC Level

YES

PHC Rajoli & SC Chimda

1. RCH Workplan Generation

2. Physical Record Updated

3. Delivary Point

4. PMMVY Quary updated

Shri. A.N. Adkine

Dt. 14/12/2018

1. Instruct to Mothly RCH

Data Updation

2. Instruct to DHIS-2 Data

Correction

3. Instruction to MR

Compain

SC Level YES

SC Chichala & SC

Yergaon

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

Shri. A.N. Adkine

Dt.19/12/2018

1. Instruct to Mothly RCH

Data Updation

2. Instruct to DHIS-2 Data

Correction

3. Instruct to PMMVY

4. Instruction to MR

Compain

PHC & SC Level YES

PHC Chiroli

1. RCH Due date updated

2. Physical Record Updated

3. Cleanness

4- pmmvy Updated

Shri. A.N. Adkine

Dt. 27/12/2018

1. Instruct to Mothly RCH

Data Updation

2. Instruct to Workplan

Generation

3. Instruct to PMMVY

3. Instruction to MR

Compain

SC Level YES

PHC Wadhona

SC Girgao

1) Discuss About MR

Vaccine Campain

2) Discuss about PMMVY

& other Yojna

3) Discuss About RKS

Expenditure.

Dr. Vinod Madavi

11/12/2018- PHC & SC NO -

PHC Moushi

SC Mendha

1) Discuss About MR

Vaccine Campain

2) Discuss about PMMVY

& other Yojna

3) Discuss About RKS

Expenditure.

Dr. Vinod Madavi

15/12/2018- PHC & SC NO -

PHC Talodhi

SC Govindpur

1) Discuss About MR

Vaccine Campain

2) Discuss about PMMVY

& other Yojna

3) Discuss About RKS

Expenditure.

Dr. Vinod Madavi

17/12/2018- PHC & SC NO -

District Chandrapur - DEO Mul

District Chandrapur - THO Nagbhid

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Balapur

SC Bond

1) Discuss About MR

Vaccine Campain

2) Discuss about PMMVY

& other Yojna

3) Discuss About RKS

Expenditure.

Dr. Vinod Madavi

21/12/2018- PHC & SC NO -

PHC Navego Pandav

SC Navkhada

1) Discuss About MR

Vaccine Campain

2) Discuss about PMMVY

& other Yojna

3) Discuss About RKS

Expenditure.

Dr. Vinod Madavi

26/12/2018- PHC & SC NO -

PHC Talodhi

SC Nanded

1) Verify Cashbook &

Grant Received

2) Verify all Registered

Maintain ( ANC , JSY,

FW, Delivery

Register)

3) Discuss about RKS

Expenditure.

Shri Prashant Junghare

12/12/2018 - PHC & SC NO -

PHC Moushi

SC Paharni

1) Verify Cashbook &

Grant Received

2) Verify all Registered

Maintain ( ANC , JSY,

FW, Delivery

Register)

3) Discuss about RKS

Expenditure.

Shri Prashant Junghare

14/12/2018 - PHC & SC NO -

SC kanpa

SC Gangasagar Heti

1) Verify Cashbook &

Grant Received

2) Verify all Registered

Maintain ( ANC , JSY,

FW, Delivery

Register)

Shri Prashant Junghare

19/12/2018 - SC NO -

SC Mohadi

SC Pardi Thavare

1) Verify Cashbook &

Grant Received

2) Verify all Registered

Maintain ( ANC , JSY,

FW, Delivery

Register)

Shri Prashant Junghare

26/12/2018 - SC NO -

District Chandrapur - Accountant Nagbhid

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Moushi

SC Mendha

1) Discuss About RCH

Data Entry & NEW DHIS

Data Entry.

2) Discuss About PMMVY

Data Entry

3) Verify HMIS Data Entry

4) Avalability Eqvipment &

Instrument

Shri Mukesh Gangamwar

11/12/2018 -PHC

SCNO

PHC Wadhona

SC Jivnapur

1) Discuss About RCH

Data Entry & NEW DHIS

Data Entry.

2) Discuss About PMMVY

Data Entry

3) Verify HMIS Data Entry

4) Avalability Eqvipment &

Instrument

Shri Mukesh Gangamwar

13/12/2018 -PHC

SCNO

SC Dongargao

SC Sawargao

1) Discuss About RCH

Data Entry & NEW DHIS

Data Entry.

2) Discuss About PMMVY

Data Entry

3) Verify HMIS Data Entry

4) Avalability Eqvipment &

Instrument

Shri Mukesh Gangamwar

17/12/2018 -SC

NO

SC Girgao

SC Kanhalgao

1) Discuss About RCH

Data Entry & NEW DHIS

Data Entry.

2) Discuss About PMMVY

Data Entry

3) Verify HMIS Data Entry

4) Avalability Eqvipment &

Instrument

Shri Mukesh Gangamwar

21/12/2018 - SC NO

Talodhi

SC Chindhichak

1) Verify Asha Record

Maintainance

2) Asha Immunization

Session

3) BF Visit At home leval &

Asha HBNC Visit

Shri Arvind Dadaji Kamdi

15/12/2018

1)Inform Asha to update

thair record & Adhar No.

& Bank acount no.

(2) BF to take visit at

beneficerise level

PHC

SCNO NO

District Chandrapur - DEO Nagbhid

District Chandrapur - BCM Nagbhid

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC wadhona

SC Girgao

1) Verify Asha Record

Maintainance

2) Asha Immunization

Session

3) BF Visit At home leval &

Asha HBNC Visit

Shri Arvind Dadaji Kamdi

19/12/2018

1)Inform Asha to update

thair record & Adhar No.

& Bank acount no.

(2) BF to take visit at

beneficerise level

PHC

SCNO NO

PHC Moushi

SC Mendha

1) Verify Asha Record

Maintainance

2) Asha Immunization

Session

3) BF Visit At home leval &

Asha HBNC Visit

Shri Arvind Dadaji Kamdi

21/12/2018

1)Inform Asha to update

thair record & Adhar No.

& Bank acount no.

(2) BF to take visit at

beneficerise level

PHC

SCNO NO

PHC Navegao Pandav

1) Verify Asha Record

Maintainance

2) Asha Immunization

Session

3) BF Visit At home leval &

Asha HBNC Visit

Shri Arvind Dadaji Kamdi

26/12/2018

1)Inform Asha to update

thair record & Adhar No.

& Bank acount no.

(2) BF to take visit at

beneficerise level

PHCNO NO

PHC Balapur

1) Verify Asha Record

Maintainance

2) Asha Immunization

Session

3) BF Visit At home leval &

Asha HBNC Visit

Shri Arvind Dadaji Kamdi

27/12/2018

1)Inform Asha to update

thair record & Adhar No.

& Bank acount no.

(2) BF to take visit at

beneficerise level

PHC NO NO

PHC Dewada

1) MVM Grant not

distibuted to SC

2)Grant not distibuted to

VHNSC

3)Cash Book not Updated

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 01/11/2018

Instruction given to

Medical Officer Facility levelYes

SC Bhurkunda

SC Pachgaon

1)Cash Book not Updated

2)MCTS Data Entry not

Updated

3) Cleanliness not

satisfactory

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 06/11/2018

Instruction given to

ANM Facility levelYes

SC Sasti 1

SC Sasti 2

1)Cash Book not Updated

2)MCTS Data Entry not

Updated

3) Cleanliness not

satisfactory

Dr.Ashok Jadhav

Taluka Health Officer

Rajura 01/12/2018

Instruction given to

ANM Facility levelYes

PHC Kadholi

1) Cleanliness not

satisfactory

2) Service book not

Updated

3)HA,ANM,MPW ATP

not found

Dr.Ashok Jadhav

Taluka Health Officer

Rajura 05/12/2018

Instruction given to

ANM Facility levelYes

District Chandrapur - THO Rajura

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Pandharpauni,

SC Pachgaon

1)Cash Book not Updated

2)MCTS Data Entry not

Updated

3) Cleanliness not

satisfactory

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 07/12/2018

Instruction given to

ANM Facility level Yes

PHC Chincholi

1)JSY Register not Updated

2)MCTS Data Entry not

Updated

3) Cleanliness not

satisfactory

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 11/12/2018

Instruction given to

Medical Officer Facility levelYes

SC Sindhi

SC Vihirgaona

1)MCTS Data Entry not

Updated

2)Cash Book not Updated

3) Institution Dilevery not

satisfactory

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 14/12/2018

Instruction given to

Medical Officer Facility levelYes

SC Temburvahi

SC Warur

1) Windows condition poor

2)Cash Book not Updated

3) MPW not visited in the

fild

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 18/12/2018

Instruction given to

Medical Officer Facility levelYes

PHC Dewada

1) RKS GB EC Meeting

Not Done

2)HA,ANM,MPW ATP not

found

3)Cash Book not Updated

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 21/12/2018

Instruction given to

Medical Officer Facility levelYes

SC Sonapur

1) Windows condition poor

2)Cash Book not Updated

3) MPW not visited in the

fild

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 26/12/2018

Instruction given to

Medical Officer Facility levelYes

SC Manoli

1) Windows condition poor

2)Cash Book not Updated

3) MPW not visited in the

fild

Dr. Ashok Jadhav

Taluka Health Officer

Rajura 28/12/2018

Instruction given to

Medical Officer Facility levelYes

PHC kadholi

1)Log Book not Updated

2)Stock Book not Updated

3) Grant Not Distibuted to

VHNSC

Shri.Vikram G.Kuril

Accountant THO Rajura

01/12/2018

Instruction given to

MO/Junior Clerk/Driver

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Chincholi

1) MVM Grant Not

Distibuted to SC

2) Stock book not Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

06/12/2018

Instruction given to

MO/Junior Clerk

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Dewada

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

13/12/2018

Instruction given to

MO/Junior Clerk

1) Facility level

2) Facility level

3) Facility level

Yes

District Chandrapur - Accountant Rajura

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Bhurkunda SC

Pachgaon

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

15/12/2018

Instruction given to

ANM & MPW

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Kadholi

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

17/12/2018

Instruction given to

MO/Junior Clerk

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Dewada

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

18/12/2018

Instruction given to

MO/Junior Clerk

1) Facility level

2) Facility level

3) Facility level

Yes

SC Pellora

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

28/12/2018

Instruction given to

ANM & MPW

1) Facility level

2) Facility level

3) Facility level

Yes

SC Bhurkunda bh.

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

29/12/2018

Instruction given to

ANM & MPW

1) Facility level

2) Facility level

3) Facility level

Yes

SC Subai

SC Vihirgaon

1) JSY Asha Incentive not

paid

2) Minuts book not

Updated

3)Fix Asset book not

Updated

Shri.Vikram G.Kuril

Accountant THO Rajura

31/12/2018

Instruction given to

ANM & MPW

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Chincholi

1) R15, R16 Ragister

verificetion

2) MCTS data entry

instruction

3) HMIS booklet

informetion

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 01/12/2018

Instruction given to

ANM & MPW Facility levelYes

SC Virur sta

1) R15, R16 Ragister

verificetion

2) MCTS data entry

instruction

3)RCH Ragister

verificetion

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 03/12/2018

Instruction given to

ANM & MPW Facility levelYes

SC Pandharpauni

1) RCH Ragister

verificetion

2) MCTS data entry

instruction

3) R15, R16 Ragister

verificetion

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 05/12/2018

Instruction given to

ANM & MPW Facility levelYes

District Chandrapur - DEO Rajura

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Dewada

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)RCH Ragister SC Kadholi

not complet

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 13/112/2018

Instruction given to

Medical Officer & ANM Facility levelYes

SC Manoli

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)OT not Started for FP

camp

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 14/12/2018

Instruction given to

Medical Officer & ANM Facility levelYes

SC Chunala

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)OT not Started for FP

camp

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 15/112/2018

Instruction given to

Medical Officer & ANM Facility levelYes

SC Sonapur

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)OT not Started for FP

camp

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 19/12/2018

Instruction given to

Medical Officer & ANM Facility levelYes

SC Arvi

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)OT not Started for FP

camp

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 28/12/2018

Instruction given to

Medical Officer & ANM Facility levelYes

PHC Kadholi

1) ANM Meeting for DHIS

2 Data entry informetion 2)

Jsy Ragister verificetion

3)Cleanliness & satisfactory

buliding

Ku.S.L. Pipare

Data Entry Opretor THO

Rajura 29/12/2018

Instruction given to

Medical Officer & ANM Facility levelYes

SC Chunala,

SC Chanakha

1)PPIUCD Cases Not

Motivated

2)Family Planning Cases

Not Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

03/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

SC Vihirgaon

SC Sindhi

1)SNCU Not Refferd

2)Family Planning Cases

Not Motivated

3)PPIUCD Cases Not

Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

06/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Chincholi

1)SNCU Not Refferd

2)Family Planning Cases

Not Motivated

3)PPIUCD Cases Not

Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

13/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Kadholi

1)PPIUCD Cases Not

Motivated

2)Family Planning Cases

Not Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

14/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

District Chandrapur - BCM Rajura

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC Chunala

1)PPIUCD Cases Not

Motivated

2)Family Planning Cases

Not Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

15/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

SC Chanakha

1)PPIUCD Cases Not

Motivated

2)Family Planning Cases

Not Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

18/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

SC Virur sta

1)SNCU Not Refferd

2)Family Planning Cases

Not Motivated

3)PPIUCD Cases Not

Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

26/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

SC Pellora

1)SNCU Not Refferd

2)Family Planning Cases

Not Motivated

3)PPIUCD Cases Not

Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

28/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

PHC Dewada

1)SNCU Not Refferd

2)Family Planning Cases

Not Motivated

3)PPIUCD Cases Not

Motivated

Ku.Sapana S.Chandekar

BCM THO Office Rajura

31/12/2018

Instruction given to

Asha/BF

1) Facility level

2) Facility level

3) Facility level

Yes

PHC Bothali

1. Financial Record

Updated

2. .JSY & FP Incentive

Inform. 3.

RKS EC Meeting

Information.

Shri Jitendra Ailanwar

Dt. 03/11/2018

1. All Records will be

prepread

2. Instruct to Audit

Information

PHC Level YES

PCH Pathari

1. Financial Record

Updated

2. .JSY & FP Incentive

Inform.

Shri Jitendra Ailanwar

Dt. 07/11/2018

1. All Records will be

prepread

2. Instruct toAudit

Information

PHC Level YES

SC Sonapur/Samda

1. Financial Record

Updated

2. .JSY Payment

information

Shri Jitendra Ailanwar

Dt. 17/11/2018

1. All Records will be

prepread

2. Instruct to Audit

Information

SC Level YES

PCH Jibgaon

1. Financial Record

Updated

2..JSY & FP Incentive

Inform. .

Shri Jitendra Ailanwar

Dt. 22/11/2018

1. All Records will be

prepread

2. Instruct to Audit

Information

PHC Level YES

SC Kawathi/Khedi

1. Financial Record

Updated

2. .JSY & FP Incentive

Inform.

Shri Jitendra Ailanwar

Dt. 26/11/2018

1. All Records will be

prepread

2. Instruct to Audit

Information

PHC Level YES

PHC Gunjewahi & Sc

Pawanpar

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

5.12.2018

Suggest To keep all

Record update And

properly and

start FW camp as soon as

possibel

PHC & sc yes

District Chandrapur - Accountant Saoli

District Chandrapur - THO Sindewahi

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Nawargaon & Sc

Pendhari

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3)Improve Institutional

delivery

Dr. Vinod K. Madavi

8.12.2018

Suggest To keep all

Record update And

properly improve

institutional delivery at

sc leval, JSY incentive

paid to all benificheri as

earlier

PHC & sc yes

PHC Mohadi & Sc Saradpar & Kalamgaon

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

11.12.2018

Suggest To keep all

Record update And

properly motivet to

coupel for use family

planning delivery at sc

leval,JSY incentive paid

to all benificheri as

earlier

PHC & sc yes

Sc Dongargaon &

Khatgaon

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

15.12.2018

Suggest To keep all

Record update And

properly and motivet to

peple for FW camp. All

incentive paid to

benifichery at SC & Phc

leval Start Fw Camp

Eairlier

SC yes

Sc Ratnapur

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

18.12.2018

Suggest To keep all

Record update And

properly improve

institutional delivery at

sc leval,JSY incentive

paid to all benificheri as

earlier

SC yes

PHC Wasera

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

19.12.2018

Suggest To keep all

Record update And

properly improve

institutional delivery at

sc leval,JSY incentive

paid to all benificheri as

earlier motivet to peple

for FW

sc yes

Sc Tekari & Navegaon

Loan

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

26.12.2018

Suggest To keep all

Record update And

properly improve

institutional delivery at

sc leval,JSY incentive

paid to all benificheri as

earlier

PHC yes

Sc TA.mendha

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Cleaning premises

Dr. Vinod K. Madavi

28.12.2018

Suggest To keep all

Record update And

properly and motivet to

peple for FW camp. All

incentive paid to

benifichery at SC & Phc

leval Start Fw Camp

earlier

SC yes

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

PHC Gunjewahi & Sc

Pawanpar

1) Record Updated

2) paid all jsy benifichery

Ms.Bharti M. Channurwar

5.12.2018

Suggest To Record

update paid all jsy

benifichery

SC&phc yes -

Phc Nawargaon

1) Record Updated

Maitained cash book

properly

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3)

Ms.Bharti M. Channurwar

6.12.2018

Suggest To keep all

Record update phc yes -

phc mohadi & wasera

1) Record Updated

Maitained cash book

properly

2) All Registered Maintain (

ANC, JSY, delivery

Register)

Ms.Bharti M. Channurwar

7.12.2018

Suggest To keep all

Record update And

properly sc yes

Phc Nawargaon

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

Ms.Bharti M. Channurwar

11.12.2018

Suggest To keep all

Record update And

properly sc yes

PhcGunjewahi

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

Ms.Bharti M. Channurwar

14.12.2018

Suggest To keep all

Record update And

properly sc yes

Sc Minghari & Ladbori

1) Record Updated

Maitained cash book

properly

2) All Registered Maintain (

ANC, JSY, delivery

Register)

Ms.Bharti M. Channurwar

15.12.2018

Suggest To keep all

Record update And

properly sc yes

Sc Dongargaon &

Khatgaon

1) Record Updated

2) All Registered Maintain (

ANC, JSY, delivery

Register)

3) Audit done last Quater

Ms.Bharti M. Channurwar

17.12.2018

Suggest To keep all

Record update sc yes -

SC DONGARGAON

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Shri.Pravin s. Mohurle

15.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

sc YES

PHC Nawargaon

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Shri.Pravin s. Mohurle

17.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

PHC YES

District Chandrapur - DEO Sindewahi

District Chandrapur - Accountant Sindewahi

Sl. No. Name of facility

Visited3 key Issues Identified

Reference (Report: name

of supervisor and date)

Action/s recommended

and agreed

Action to be taken at what level

(State, Division, District, Block,

Facility) and by whom

Action taken

(Yes/No)

Pending at

what level

SC KHATGAON

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Shri.Pravin s. Mohurle

18.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

SC YES

SC PAWANPAR

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Shri.Pravin s. Mohurle

20.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

SC YES

PHC Gunjewahi

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Mrs.Lata Raju Tadam

7.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

sc YES

PHC mohadi

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Mrs.Lata Raju Tadam

11.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

PHC YES

PHC nawargaon

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Mrs.Lata Raju Tadam

14.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

SC YES

PHC wasera

1)MCTS Entry Not

Completed

2)Rch ragister not

complited

Mrs.Lata Raju Tadam

24.12.2018

Suggest To Record

update compite all entry

of mother inRCH

PORTAL

SC YES

District Chandrapur - BCM Sindewahi