COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page i
REPUBLIC OF KENYA
BARINGO COUNTY
Office of the Governor,
County Government of Baringo
P.O. Box 53-30400
KABARNET
Tel: 053-21077
Email:[email protected]/[email protected]
Website: www.baringo.go.ke
FIRST COUNTY INTEGRATED DEVELOPMENT PLAN
2013 – 2017
AUGUST 2013
KENYA
TOWARDS A GLOBALLY COMPETITIVE AND PROSPEROUS NATION
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page ii
County Vision and Mission
1.1 Preamble
This county integrated development plan captures the aspirations, values and important
qualities of diverse communities in Baringo County. It also provides a roadmap of working
towards those important ends over the next five years. It is the result of the collaborative
effort of the people and leadership of the county led by the governor and his executive team,
the county assembly and other strategic stakeholders that respect the law and existing
development plans such as the MDGs and Vision 2030.
1.2 Shared vision
To be the most attractive, competitive and resilient county that affords the highest standard
of living and security for all its residents.
1.3 Mission
To transform the livelihoods of Baringo residents by creating a conducive framework that
offers quality services to all citizens in a fair, equitable and transparent manner by
embracing community managed development initiatives for environmental sustainability,
adaptable technologies, innovation and entrepreneurship in all spheres of life.
1.4 Core values
1. Honesty, integrity and prudent use of public resources
2. Environmental sustainability
3. Good governance, Transparency and Accountability
4. Harmonious and peaceful coexistence
5. Equitable, inclusive and People-driven leadership
6. Commitment toeam work and appreciation for diversity
7. Commitment to Results:
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page iii
FOREWORD
The constitution of Kenya 2010 establishes one of the most revolutionary
changes in the country‘s history with the establishment of the two tier
governance system with a national government and 47 county governments.
The constitution envisages that county governments shall spearhead
development at the county level with a view to bridge the developmental
disparities that have existed in the country since independence. Needless to
point out therefore, County governments have been tasked with specific
functions under the constitution, key among them agriculture, health, trade,
roads, county planning so as to spur growth and create employment.
Pursuant to the specific mandate in the Constitution 2010, the County
Government is required to prepare County Integrated Development Plan
(CIDP) that outlines the development goals covering a period of five years. The CIDP is the first for Baringo
County as it is in the other Counties and will cover the period 2013-2017. It replaces the District
Development Plans, which were used to guide development with the focus at the District under the former
constitutional dispensation. The Baringo CIDP has been prepared through an inclusive and a wide
consultative process required by Article 10 of the Constitutiuon.
Under the constitution of Kenya 2010, National and County Governments are distinct but interdependent.
The County Government is composed of the Governor, County Executive Committee and County Assembly.
The County Executive Committee is expected to supervise the administration and delivery of services to the
County citizenery as well as conceptualize and implement policies and county legislation. The County
Assembly is a legislative organ and will play an oversight role on all County public institutions including the
urban areas.
The County Government responsibilities and functions are specifically spelt out under the Fourth Schedule
of the Constitution. Currently, not all functions in the fourth schedule have been transfered to the county
governments. The County Government of Baringo will ensure that it has the capacity to undertake all the
functions as stipulated in the fourth schedule by the end of the transition period. This will include: prudence
financial management practices; build strong institutions of management of county affairs; and training and
capacity building of county government staff and the County Assembly. These will be done under the legal
framework established to support county governments where several laws on devolution have been enacted
including; The Urban Areas and Cities Act 2011; The County Governments Act 2012; The Traansition to
Devolved Government Act, 2012; The Intergovernmental Relations Act 2012 and The Public Finance
Management Act, 2012. Other relevant laws that have been enacted in the different sectors to support
implementation and operationalization of devolution include; the National Government Coordinating Act,
2012, and the County Governments Public Finance Management Transition Act, 2012.
Programmes that focus on the youthful population, who account for the highest proportion of the population,
especially addressing youth unemployment, will be implemented during the Plan period. Attention will be
given to provide knowledge and skills with a bias on entrepreneurship with affordable credit to enable them
engage in production of goods and services. Besides, the County Government is expected and will expand
middle level colleges in the county to take advantage of opportunities in the industrial sector as the county
moves towards industrialization. In addition, programmes and projects that support the agricultural sector,
H.E.Hon. Cheboi Benjamin, EBS
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page iv
which is the main economic activity in the county, will be aimed at transforming farming to make it more
competitive and increase production per unit.Raising the profitability of farmers will not only boost the
livelihoods of the county residents, but also attract the youth to join the sector, helping to also address
unemployment among the youth. The County Government will also start programmes aimed at diversifying
economic activities in the county. This includes value addition to agricultural produce and establishing
tourism sector and a circuit in the North Rift Region.
The County Government will work to attract investors in the county. Specific initiatives to establish and
create an enabling environment to attract direct investments in the county will be implemented. Key projects
especially the infrastructural projects will be marketed to investors to be implemented under the Public
Private Partnerships. This will also address the financing gaps for projects in the county.
Finally, I call upon the residents of the County of Baringo to commit towards the development process
outlined in this Plan. This is the beginning of a new phase that will see the transformation of the county,
improve the quality of life of the residents and as such all the stakeholders in the county must work together
to ensure that the Plan‘s objectives are realized.
H.E.Hon. Cheboi Benjamin, EBS
Governor, Baringo County
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page v
AKNOWLEDGEMENTS
The first County Integrated development Plan for County of Baringo was
prepared with the support and generous contribution of many individuals and
organizations. Our County Executive Committee would wish to appreciate the
role played by these individuals and institutions. Special thanks go to the
following; Acting Executive Committee Member for Finance Hon. Wesley
Keitany,and all the respective County Executive Committee Members; Hon.
Emily Cherogony,Hon Edwin Riamangura, Hon Caroline Lentupuru Hon.
Sadalla Lillian, Hon. Dr. Andrew Kwonyike, Hon. Geoffrey Bartenge, Hon. Job Tomno, Hon. Moses
Atuko,Consultants Julius Barno, Benjamin Sogomo and Felix Kiptum, and Kiprono Kosgei,County Development
Planning Officer. Other members of staff at the planning department who played a key role incude Mr. Simiyu Peter
Nalanda, Daniel K. Koech, Waweru James,. Brian Cheruiyot, Michael Ngetich, Solomon Kimuna among others.
We are also indebted to our partners USAID for their immense contribution financially and materially, as without them
the process could have stalled.
We are also thankful to the Honorable members of the Baringo County Assembly led by the Hon. Speaker Mr. Kamket
William who actively participated in the Public consultative forums and adoption of the Plan. The role of the various
stakeholders including government departments, civil society organizations, community members and the private sector
would not go unnoticed. Our appreciation also goes to the community members who participated in this process thereby
ensuring that we are in conformity with article 10 of the constitution. We particularly thank the County Directors of
various departments for the valuable role they played in sensitizing the community aspirations and linking them to
priority programmes and projects.
The Ministry of Devolution and Planning played a key role by preparing the guidelines and County Development
Profiles that has been borrowed heavily in doing this work and thus instrumental in preparation of this Plan.
To those who were involved, we salute you as we acknowledge that the greater challenge lies in the actual
implementation of this Plan.
We call on you to continue with the same support as we deliver the the programmes and projects documented herein,
and as we contribute towards attaining the priorities of the county including the Millenium Development Goals and
Vision 2030 which is the country‘s long term development blueprint that aims to create a globally competitive and
prosperous country providing a high quality of life for all its citizens. It aspires to transform Kenya into a newly
industrializing middle income country by 2030.
H.E. Hon. Eng.Tuitoek Matthew
Deputy Governor, Baringo County
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page vi
PREFACE
The Baringo County Integrated Development Plan was prepared by a county secretariat
that was led by the Committee Executive Member in charge of Finance and Planning
and the County Development Planning Officer in close collaboration with various
stakeholders including government departments, civil society organizations,
community groups and the private sector. In line with Article 10 of the Constitution of
Kenya 2010, the secretariat undertook consultations in all the 30 wards and
subcounties in the month of July and August 2013 to identify key development
priorities to be implemented over the next five years. These priorities were used to
inform the projects and programmes in this Plan. The increased participation by a wide
cross section of the people in the county in the preparation of the Plan is expected to
enhance the achievement of the key goal of devolution which is to empower citizens to
exercise their rights to be involved in their social and economic development.
The Kenya Vision 2030 is the country‘s development blueprint covering the period 2008 to 2030. It aims to transform
Kenya into a newly industrializing, ―middle –income country providing a high quality life to all its citizens by the year
2030‖.The vision is based on three pillars;Economic ,Social and Political Pillar.The pillars are supported by key
enablers and macro foundations of the Vision.For each of the Pillars and the key enablers and macro
foundations,priority sectors have been identified to drive the aspirations of the Vision.The Vision has also identified a
number of flagship projects to be implemented accros the country includind Baringo county for all sectors.
As provided by the constitution, the Plan is aligned with the Kenya Vision 2030 and the Second Medium Term
Plan.There are a number of the Vision flagship projects that are being implementedin the County. These projects have
been documented in this Plan, and the County Government will work together with the National Government to ensure
the successful implementation of these projects. In line with the development priorities outlined in the Second Medium
Plan aims at transforming the agricultural sector in the county, which is the backbone of the county‘s economy. Target
areas in this sector include increasing the area under irrigation, diversification of crop enterprises, support the
development of the livestock sector and improve the marketing of the agricultural produce to reduce exploitation by
middlemen. The county government will also seek to develop the industrial sector beginning with light manufacturing
for value addition and processing of agricultural produce. In addition, priority projects to support the sector such as in
the infrastructure, tourism, health and education sectors will be prioritized for implementation.
The county government will prioritize capacity building of the county executive, the staff and county assembly through
training programmes in addition to those organized by the national government. The county public service board will
recruit qualified and skilled human resources to ensure that the County Government of Baringo delivers on the mandate.
The County government will also work closely with the national government, development partners, private sector, civil
society organizations including faith based organizations, and other stakeholders in improving the livelihoods of the
people of Baringo County.
Hon.Kipchumba Wesley Keittany,
Ag.County Executive Committee Member,
Finance and Economic Planning.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page vii
Table of Contents
REPUBLIC OF KENYA ............................................................................................................................... I
BARINGO COUNTY .................................................................................................................................... I
COUNTY VISION AND MISSION .............................................................................................................. II
1.1 PREAMBLE ........................................................................................................................................... II
1.2 SHARED VISION .................................................................................................................................... II
1.3 MISSION ............................................................................................................................................... II
1.4 CORE VALUES ...................................................................................................................................... II
FOREWORD ............................................................................................................................................... III
AKNOWLEDGEMENTS ............................................................................................................................. V
PREFACE .................................................................................................................................................... VI
TABLE OF CONTENTS ............................................................................................................................ VII
LIST OF TABLES ...................................................................................................................................... XV
LIST OF MAPS AND FIGURES ............................................................................................................. XVII
ABBREVIATIONS AND ACRONYMS .................................................................................................. XVIII
EXECUTIVE SUMMARY ........................................................................................................................ XXI
CHAPTER ONE .......................................................................................................................................... 24
THE PROFILE ............................................................................................................................................ 24
1.1. LOCATION AND SIZE .......................................................................................................................... 25
1.2. PHYSICAL FEATURES ......................................................................................................................... 26
1.2.1. TOPOGRAPHY ................................................................................................................................. 26
1.2.2. WATER BODIES .............................................................................................................................. 26
1.2.3. ECOLOGICAL CONDITIONS ............................................................................................................. 26
1.2.4. CLIMATIC CONDITIONS .................................................................................................................. 27
1.3. ADMINISTRATIVE AND POLITICAL UNITS ........................................................................................... 27
1.3.1. ADMINISTRATIVE UNITS (SUB-COUNTIES, WARDS, LOCATIONS) ................................................... 27
1.3.2. POLITICAL UNITS ........................................................................................................................... 30
1.4. DEMOGRAPHIC ATTRIBUTES .............................................................................................................. 30
1.4.1. POPULATION SIZE AND COMPOSITION ........................................................................................... 30
1.4.2. POPULATION DENSITY AND DISTRIBUTION .................................................................................... 31
1.5. HUMAN DEVELOPMENT INDICATORS ................................................................................................. 36
1.5.1. YOUTH DEVELOPMENT INDEX (YDI) ............................................................................................ 37
1.5.2. GENDER DEVELOPMENT INDEX (GDI) AND GENDER EMPOWERMENT MEASURE (GEM)............ 37
1.5.3. SUMMARY OF SOCIO-ECONOMIC INDICATORS OF BARINGO COUNTY ........................................... 38
1.5.4. POVERTY LEVELS ........................................................................................................................... 40
1.6. INFRASTRUCTURE AND ACCESS ......................................................................................................... 41
1.6.1. ROAD, RAIL NETWORK, AIRPORTS AND AIRSTRIPS ........................................................................ 41
1.6.2. POSTS AND TELECOMMUNICATIONS: POSTS OFFICES, MOBILE TELEPHONY AND LANDLINE ........ 43
1.6.3. FINANCIAL SECTOR: BANKS, SACCOS AND MICRO-FINANCE INSTITUTIONS ............................. 43
1.6.4. EDUCATION INSTITUTIONS ............................................................................................................ 43
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page viii
1.6.5. ENERGY ACCESS ............................................................................................................................ 44
1.6.6. MARKETS AND URBAN CENTRES ................................................................................................... 44
1.6.7. HOUSING TYPES ............................................................................................................................. 44
1.7. LAND AND LAND USE ......................................................................................................................... 45
1.8. MEAN LAND HOLDING SIZE ................................................................................................................ 47
1.8.1. PERCENTAGE OF LAND WITH TITLE DEEDS .................................................................................... 47
1.8.2. LANDLESSNESS IN BARINGO .......................................................................................................... 47
1.9. COMMUNITY ORGANISATIONS/NON-STATE ACTORS ......................................................................... 47
1.9.1. COOPERATIVE SOCIETIES ............................................................................................................... 47
1.9.2. NON-GOVERNMENTAL AND INTERNATIONAL ORGANISATIONS ..................................................... 49
1.9.3. SELF HELP, WOMEN AND YOUTH GROUPS ...................................................................................... 49
1.9.4. ORPHANS AND VULNERABLE CHILDREN-CASH TRANSFER. ........................................................... 49
1.9.5. KABARNET VOCATIONAL REHABILITATION CENTRE (KVRC) ..................................................... 49
1.9.6. MARIGAT COMMUNITY CAPACITY SUPPORT PROGRAMME (CCSP MARIGAT) ............................ 50
1.9.7. GOK GRANTS TO COMMUNITY INITIATIVES .................................................................................. 50
1.9.8. OLDER PERSONS CASH TRANSFER (OPCT) ................................................................................... 50
1.9.9. PEOPLE WITH SEVERE DISABILITY (PWSD) CASH TRANSFER ...................................................... 50
1.9.10. NATIONAL FUND FOR THE DISABLED OF KENYA/ NATIONAL COUNCIL FOR PEOPLE WITH
DISABILITY (NFDK/NCPWD) ...................................................................................................................... 50
1.9.11. WOMEN ENTERPRISE FUND (WEF) ............................................................................................... 51
1.10. CROP, LIVESTOCK AND FISH PRODUCTION ..................................................................................... 51
1.10.1. MAIN CROPS PRODUCED ................................................................................................................ 51
1.10.2. ACREAGE UNDER FOOD CROPS AND CASH CROPS .......................................................................... 52
1.10.3. AVERAGE FARM SIZES ................................................................................................................... 54
1.10.4. MAIN STORAGE FACILITIES ............................................................................................................ 54
1.11. LIVESTOCK POPULATION ............................................................................................................... 55
1.11.1. CONTRIBUTION OF LIVESTOCK TO THE ECONOMY ......................................................................... 56
1.11.2. NUMBER OF RANCHES .................................................................................................................... 57
1.11.3. MAIN FISHING ACTIVITIES ............................................................................................................. 58
1.11.4. FORESTRY AND AGRO-FORESTRY .................................................................................................. 58
1.11.5. MAIN FOREST TYPES AND SIZES OF FORESTS ................................................................................. 58
1.11.6. FOREST PRODUCTS FROM GAZETTED AND UNGAZETTED FORESTS ................................................ 58
1.11.7. PROMOTION OF AGRO-FORESTRY AND GREEN ECONOMY ............................................................. 59
1.12. ENVIRONMENT AND CLIMATE CHANGE ......................................................................................... 60
1.12.1. MAJOR CONTRIBUTORS TO ENVIRONMENTAL DEGRADATION ....................................................... 60
1.12.2. EFFECTS OF ENVIRONMENTAL DEGRADATION .............................................................................. 61
1.12.3. CLIMATE CHANGE AND ITS EFFECTS .............................................................................................. 61
1.12.4. CLIMATE CHANGE MITIGATION MEASURES AND ADAPTATION STRATEGIES ................................. 61
1.13. MINING .......................................................................................................................................... 62
1.13.1. ONGOING ACTIVITIES ..................................................................................................................... 62
1.13.2. MINING POTENTIAL........................................................................................................................ 62
1.14. TOURISM ........................................................................................................................................ 62
1.14.1. MAIN TOURIST ATTRACTION, NATIONAL PARKS AND RESERVES .................................................. 62
1.14.2. MAIN WILDLIFE ............................................................................................................................. 63
1.15. EMPLOYMENT AND OTHER SOURCES OF INCOME .......................................................................... 64
1.15.1. WAGE EARNERS ............................................................................................................................. 64
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page ix
1.15.2. SELF EMPLOYED ............................................................................................................................ 64
1.15.3. LABOUR FORCE .............................................................................................................................. 64
1.15.4. UNEMPLOYMENT LEVELS .............................................................................................................. 65
1.16. WATER AND SANITATION .............................................................................................................. 65
1.16.1. WATER RESOURCES AND QUALITY ................................................................................................ 65
1.16.2. WATER SUPPLY SCHEMES .............................................................................................................. 66
1.16.3. WATER SOURCES (DISTANCE TO THE NEAREST WATER POINTS) ................................................... 66
1.16.4. SANITATION ................................................................................................................................... 66
1.17. EDUCATION AND LITERACY ........................................................................................................... 67
1.17.1. PRE-SCHOOL EDUCATION .............................................................................................................. 67
1.17.2. SPECIAL NEEDS EDUCATION [SNE] .............................................................................................. 67
1.17.3. PRIMARY EDUCATION .................................................................................................................... 68
1.17.4. LITERACY ...................................................................................................................................... 69
1.17.5. SECONDARY EDUCATION ............................................................................................................... 69
1.17.6. TERTIARY EDUCATION ................................................................................................................... 69
1.18. HEALTH ACCESS AND NUTRITION ................................................................................................. 70
1.18.1. HEALTH FACILITIES, PERSONNEL ................................................................................................... 70
1.18.2. MORBIDITY .................................................................................................................................... 70
1.18.3. NUTRITIONAL STATUS ................................................................................................................... 70
1.18.4. IMMUNISATION COVERAGE ............................................................................................................ 71
1.18.5. ACCESS TO FAMILY PLANNING SERVICES/CONTRACEPTIVE PREVALENCE .................................... 71
CHAPTER TWO ......................................................................................................................................... 72
COUNTY DEVELOPMENT ANALYSIS ................................................................................................... 72
2.1. NATIONAL CONTEXT .......................................................................................................................... 72
2.2. THE SECOND MEDIUM-TERM PLAN (MTP2): .................................................................................... 72
2.3. MILLENNIUM DEVELOPMENT GOALS (MDGS) ................................................................................. 73
2.4. CONSTITUTION OF KENYA, 2010 ....................................................................................................... 74
2.5. VISION 2030 FLAGSHIP PROJECTS AFFECTING BARINGO COUNTY .................................................... 74
2.6. REGIONAL CONTEXT .......................................................................................................................... 75
2.7. COMPARATIVE ADVANTAGES OF BARINGO COUNTY ........................................................................ 75
2.8. MAJOR DEVELOPMENT CHALLENGES ................................................................................................ 76
2.8.1. POOR INFRASTRUCTURE ................................................................................................................ 76
2.8.2. LIMITED WATER RESOURCES ......................................................................................................... 76
2.8.3. ENVIRONMENTAL DEGRADATION .................................................................................................. 77
2.8.4. POOR MARKETING SYSTEM AND LIMITED ACCESS TO FINANCIAL CREDIT SERVICES .................... 77
2.8.5. WEAK INSTITUTIONAL SYSTEMS ................................................................................................... 78
2.8.6. INFORMATION AND COMMUNICATION TECHNOLOGY .................................................................... 78
2.8.7. UNEMPLOYMENT ........................................................................................................................... 78
2.8.8. INSECURITY ................................................................................................................................... 78
2.8.9. RETROGRESSIVE CULTURAL PRACTICES ........................................................................................ 79
2.8.10. LAND TENURE SYSTEM .................................................................................................................. 79
2.9. CROSS CUTTING ISSUES ..................................................................................................................... 79
2.9.1. POVERTY ........................................................................................................................................ 79
2.9.2. GENDER INEQUALITY .................................................................................................................... 80
2.9.3. HIGH POPULATION GROWTH RATE ................................................................................................. 82
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page x
2.9.4. DISASTER MANAGEMENT ............................................................................................................... 83
2.9.5. ENVIRONMENTAL AND CLIMATE CHANGE ..................................................................................... 84
2.9.6. COUNTY DIVERSITY – MINORITY GROUPS AND REGIONAL BALANCE ........................................... 85
2.9.7. YOUTH ........................................................................................................................................... 86
2.9.8. PERSONS WITH DISABILITIES (PWDS ............................................................................................ 87
2.9.9. HIV AND AIDS .............................................................................................................................. 88
2.9.10. INFORMATION COMMUNICATION TECHNOLOGY ............................................................................ 89
2.10. ANALYSIS OF ISSUES AND CAUSES – POTENTIAL STRATEGIC POLICY THRUSTS ............................ 90
2.10.1. AGRICULTURE AND RURAL DEVELOPMENT SECTOR...................................................................... 90
2.10.2. HEALTH SECTOR ............................................................................................................................ 91
2.10.3. ENVIRONMENTAL PROTECTION, WATER AND HOUSING SECTOR ................................................. 92
2.10.4. PUBLIC ADMINISTRATION AND INTERNATIONAL RELATIONS SECTOR (PAIR) ............................ 93
2.10.5. SOCIAL PROTECTION, CULTURE AND RECREATION ...................................................................... 93
2.10.6. EDUCATION .................................................................................................................................... 94
2.10.7. ENERGY, INFRASTRUCTURE AND INFORMATION COMMUNICATION AND TECHNOLOGY .............. 95
2.10.8. GENERAL ECONOMIC, COMMERCIAL AND LABOUR ....................................................................... 95
CHAPTER THREE ..................................................................................................................................... 96
DEVELOPMENT STRATEGY .................................................................................................................. 96
3.1. WHAT DOES IT MEAN TO BE DEVELOPED? ......................................................................................... 96
3.2. THE WEALTH CREATION PATTERN ..................................................................................................... 97
3.3. IMPORTANCE OF ADOPTING A STRATEGIC APPROACH ....................................................................... 98
3.4. OVERALL OBJECTIVES .....................................................................................................................100
3.5. SOCIAL DEVELOPMENT GOALS ........................................................................................................101
3.6. ECONOMIC DEVELOPMENT GOALS ...................................................................................................101
3.7. ENVIRONMENTAL GOALS .................................................................................................................102
3.8. TRANSPORT AND INFRASTRUCTURE GOALS ....................................................................................102
3.9. DEVELOPMENT TARGETS .................................................................................................................103
CHAPTER FOUR ..................................................................................................................................... 107
COUNTY SPATIAL PLANNING FRAMEWORK .................................................................................. 107
4.1. INTRODUCTION ................................................................................................................................107
4.1.1. ROLE OF SPATIAL PLANNING .......................................................................................................108
4.1.2. OBJECTIVES OF SPATIAL PLANNING .............................................................................................108
4.1.3. APPROACH REQUIRED ..................................................................................................................108
4.1.4. RATIONALE FOR SPATIAL PLANNING ...........................................................................................108
4.2. THE BARINGO SPATIAL PLANNING FRAMEWORK ............................................................................108
4.3. URBANISATION IN BARINGO COUNTY .............................................................................................109
4.4. THE SERVICE CENTRE POLICY ..........................................................................................................109
4.4.1. DESIGNATED LOCAL CENTRES .....................................................................................................110
4.4.2. DESIGNATED MARKET CENTRES ..................................................................................................110
4.4.3. DESIGNATED RURAL CENTRE.......................................................................................................110
4.4.4. DESIGNATED URBAN CENTRES ....................................................................................................111
4.5. CONNECTIVITY BETWEEN THE SERVICE CENTRES ...........................................................................112
4.6. PHYSICAL DEVELOPMENT PLANS .....................................................................................................112
4.7. MODEL PHYSICAL DEVELOPMENT PLAN – A CASE OF MARIGAT TOWN ..........................................115
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xi
4.7.1. RESIDENTIAL LAND USE (ZONE 0) ...............................................................................................115
4.7.2. INDUSTRIAL- ZONE 1 ...................................................................................................................116
4.7.3. EDUCATION- ZONE 2 ...................................................................................................................116
4.7.4. RECREATION-ZONE 3 ...................................................................................................................116
4.7.5. PUBLIC PURPOSE -ZONE 4 ............................................................................................................116
4.7.6. COMMERCIAL ZONE - ZONE 5 ......................................................................................................116
4.7.7. PUBLIC UTILITY- ZONE 6 .............................................................................................................117
4.7.8. TRANSPORT –ZONE 7 ...................................................................................................................117
4.7.9. URBAN AGRICULTURE - ZONE 9 ..................................................................................................117
4.8. HOUSING IN BARINGO COUNTY .......................................................................................................117
CHAPTER FIVE ....................................................................................................................................... 119
ICT FRAMEWORK .................................................................................................................................. 119
5. ICT FRAMEWORK ................................................................................................................................119
5.1. INTRODUCTION ................................................................................................................................119
5.2. DELIVERING BETTER SERVICES .......................................................................................................120
5.3. OPEN GOVERNMENT ........................................................................................................................122
5.4. IMPROVE COUNTY GOVERNMENT OPERATIONS ...............................................................................123
5.5. ICT INFRASTRUCTURE .....................................................................................................................123
5.6. INFORMATION SECURITY RISK MANAGEMENT .................................................................................124
5.7. ESSENTIAL ICT SYSTEMS ................................................................................................................124
CHAPTER SIX .......................................................................................................................................... 125
DISASTER MANAGEMENT FRAMEWORK ........................................................................................ 125
CHAPTER SEVEN .................................................................................................................................... 128
COUNTYINTEGRATED DEVELOPMENT PLAN,LINKAGES WITH OTHER PLANS. .................... 128
7.1. INTRODUCTION ................................................................................................................................128
7.2. INTEGRATED DEVELOPMENT PLANNING ..........................................................................................128
7.3. LEGISLATION ON INTEGRATED PLANNING IN KENYA ......................................................................128
7.3.1. THE COUNTY GOVERNMENT ACT 2012 .......................................................................................128
7.3.2. TRANSITION TO DEVOLVED GOVERNMENT ACT, 2012 ...............................................................129
7.3.3. PUBLIC FINANCE MANAGEMENT ACT (PFMA), 2012 .................................................................129
7.3.4. URBAN AREAS AND CITIES ACT, 2011 ........................................................................................129
7.4. CIDP LINKAGES WITH KENYA VISION 2030 AND MEDIUM TERM PLAN ........................................130
7.5. CIDP LINKAGES WITH THE KENYA CONSTITUTION, 2010 ..............................................................131
7.6. IMPLEMENTATION OF MILLENNIUM DEVELOPMENT GOALS AT THE COUNTY ................................132
CHAPTER EIGHT .................................................................................................................................... 134
RESOURCE MOBILISATION FRAMEWORK ...................................................................................... 134
8.1. INTRODUCTION ................................................................................................................................134
8.2. TRENDS ............................................................................................................................................134
8.3. CONSTRAINTS TO RESOURCE MOBILISATION: ..................................................................................134
8.4. CAPITAL PROJECTS FUNDING ...........................................................................................................135
8.5. STRATEGIES FOR RAISING REVENUE ................................................................................................135
8.6. ESTABLISHMENT OF BARINGO INVESTMENT VEHICLE (BARINGO INVESTMENT CORPORATION) ...136
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xii
8.6.1. MANDATE ....................................................................................................................................136
8.7. ASSETS AND FINANCIAL MANAGEMENT ..........................................................................................137
8.8. RESOURCES FROM THE NATIONAL GOVERNMENT ..........................................................................138
8.9. STRATEGIES FOR MOBILISING BARINGO COUNTY HUMAN CAPITAL ..............................................138
8.10. OTHER STRATEGIES FOR MOBILISING COUNTY RESOURCES .......................................................139
CHAPTER NINE ....................................................................................................................................... 140
INVESTMENT FRAMEWORK ............................................................................................................... 140
9.1. ALLOCATION OF RESOURCES AMONG SECTORS ...............................................................................140
9.2. PROJECT SELECTION FRAMEWORK ..................................................................................................140
9.3. PUBLIC INVESTMENTS ......................................................................................................................141
9.4. PRIVATE INVESTMENTS ...................................................................................................................142
9.5. PUBLIC-PRIVATE PARTNERSHIPS .....................................................................................................142
9.6. PUBLIC-PUBLIC PARTNERSHIPS .......................................................................................................142
9.7. ROLE OF PUBLIC PROCUREMENT IN THE ECONOMIC DEVELOPMENT ...............................................143
CHAPTER TEN ........................................................................................................................................ 145
INSTITUTIONALFRAMEWORK ........................................................................................................... 145
10.1. SECTORAL PLANS .........................................................................................................................145
10.2. ORGANISATIONAL FLOW .............................................................................................................146
10.3. DEVOLVED COUNTY LEVEL UNITS .............................................................................................146
10.4. STAKEHOLDERS IN THE COUNTY .................................................................................................147
DEVELOPMENT PROGRAMMES AND PROJECTS ............................................................................ 149
11.1. INTRODUCTION ............................................................................................................................149
11.2. COUNTY FLAGSHIP PROJECTS/PROGRAMMES .............................................................................149
GENERAL ECONOMIC .......................................................................................................................... 149
COMPREHENSIVE BASELINE SURVEY, RESOURCE MAPPING AND CIDP DELIVERY
ENVIRONMENT ...................................................................................................................................... 149
LAND AND URBAN DEVELOPMENT ................................................................................................... 149
ESTABLISHMENT OF SPATIAL INFRASTRUCTURE ........................................................................ 149
WATER AND IRRIGATION .................................................................................................................... 150
TRANSPORT ............................................................................................................................................ 150
AVIATION ................................................................................................................................................ 152
HEALTH ................................................................................................................................................... 152
UPGRADING OF A KABARNET SUB-COUNTY HOSPITAL TO LEVEL 5 ....................................... 152
TOURISM ................................................................................................................................................. 152
DEVELOPMENT OF KAMNAROK GAME RESERVE ......................................................................... 152
EDUCATION ............................................................................................................................................ 152
ESTABLISH 3 NEW TECHNICAL INSTITUTIONS IN 3 SUB COUNTIES ......................................... 152
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xiii
ESTABLISH ONE PUBLIC UNIVERSITY ............................................................................................. 152
ESTABLISHMENT OF LIBRARIES ....................................................................................................... 152
INDUSTRIAL ............................................................................................................................................ 152
ESTABLISHMENT OF AN INDUSTRIAL PARK / CORRIDOR ........................................................... 152
PPP INVESTMENTS IN AGRICULTURE, LIVESTOCK AND FISHERIES ........................................ 152
ESTABLISHMENT OF FISH VALUE CHAIN FACILITY .................................................................... 152
DAIRY PROCESSING PLANT ................................................................................................................ 153
POTATO COLD STORAGE PLANT ....................................................................................................... 153
LEATHER DEVELOPMENT CENTRE .................................................................................................. 153
LORUK AND BARWESSA INTERNATIONAL CLASS SLAUGHTERHOUSE ................................... 153
FRUIT AND NUT PROCESSING ............................................................................................................ 153
ENERGY ................................................................................................................................................... 153
ESTABLISHMENT OF THE BARINGO ENERGY CORPORATION ................................................... 153
YOUTH...................................................................................................................................................... 153
ESTABLISHMENT OF YOUTH EMPOWERMENT CENTRES ........................................................... 153
11.3. AGRICULTURE AND RURAL DEVELOPMENT ................................................................................154
ROLE OF STAKEHOLDERS .............................................................................................................................154
11.3.2. COOPERATIVE DEVELOPMENT ....................................................................................................160
11.3.3. PROPOSEDACTIVITIES (MTP CONSULTATIONS) UNDER AGRICULTURE SECTOR ........................163
11.3.4. NEW PROJECTS (CIDP SUB COUNTY CONSULTATIONS) .............................................................165
11.3.5. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................168
11.4. EDUCATION SECTOR ....................................................................................................................168
ONGOING PROJECTS: EDUCATION ................................................................................................... 170
11.4.1. NEW PROJECT PROPOSALS ...........................................................................................................170
11.4.2. PROPOSED PROGRAMMES ............................................................................................................172
11.4.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES ...............................................................174
11.5. ENERGY INFRASTRUCTURE AND ICT SECTOR .............................................................................174
VISION .........................................................................................................................................................174
MISSION .......................................................................................................................................................174
COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................174
ROLE OF STAKEHOLDERS ............................................................................................................................174
11.5.1. PROJECTS AND PROGRAMME PRIORITIES ....................................................................................175
11.5.2. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................179
11.6. ENVIRONMENTAL PROTECTION WATER AND HOUSING SECTOR ................................................180
VISION .........................................................................................................................................................180
MISSION .......................................................................................................................................................180
COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................180
ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................180
11.6.1. PROJECT AND PROGRAMME PRIORITIES ......................................................................................181
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xiv
FLAGSHIP PROJECTS ............................................................................................................................ 181
11.6.2. NEW PROPOSALS (MTP CONSULTATIONS) .................................................................................181
11.6.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................199
11.7. GENERAL ECONOMIC, COMMERCIAL AND LABOUR AFFAIRS (GECLA) ....................................199
ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................200
11.7.1. PROJECTS/PROGRAMMES .............................................................................................................201
TRADE AND INDUSTRY ......................................................................................................................... 201
11.7.2. PROPOSED PROJECTS (CIDP SUBCOUNTY CONSULTATIONS) .....................................................205
11.7.3. STRATEGIES TO MAINSTREAM CROSS CUTTING ISSUES ...............................................................211
11.8. HEALTH SECTOR ..........................................................................................................................212
VISION ...................................................................................................................................................... 212
MISSION ................................................................................................................................................... 212
COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................212
ROLE OF STAKEHOLDERS ............................................................................................................................212
11.8.1. PROJECT AND PROGRAMME PRIORITIES ......................................................................................213
11.8.2. ON-GOING PROJECTS AND PROGRAMMES: NATIONAL HOSPITAL INSURANCE FUND .................214
11.8.3. PROPOSED PROJECTS/ PROGRAMMES: HEALTH SERVICES ..........................................................217
11.8.4. CROSS-CUTTING ISSUES ...............................................................................................................220
11.9. SOCIAL PROTECTION CULTURE AND RECREATION .....................................................................220
VISION ...................................................................................................................................................... 220
MISSION ................................................................................................................................................... 220
11.9.1. COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................220
ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................221
11.9.2. PROJECTS AND PROGRAMMES .....................................................................................................222
ON- GOING PROJECT/PROGRAMMES ............................................................................................................222
11.9.3. NEW PROJECTS (MPT 2 CONSULTATIONS) ....................................................................... 225
11.9.4. MAINSTREAMING OF CROSS-CUTTING ISSUES ............................................................................230
11.10. GOVERNANCE, JUSTICE, LAW AND ORDER SECTOR (GJLOS) ....................................................231
VISION ...................................................................................................................................................... 231
MISSION ................................................................................................................................................... 231
COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................231
ROLE OF THE STAKEHOLDERS .....................................................................................................................231
11.10.1. PROJECTS AND PROGRAMMES .................................................................................................233
ONGOING PROJECTS AND PROGRAMMES ...................................................................................... 233
NEW PROJECTS (MTP CONSULTATIONS) ......................................................................................... 234
THE MTP CONSULTATIONS IDENTIFIED SECURITY AS A PRIORITY AREA THAT NEEDED
URGENT ATTENTION. ........................................................................................................................... 234
11.10.2. PROPOSED PROJECTS ...............................................................................................................236
11.10.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .........................................................237
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xv
11.11. FINANCE AND ECONOMIC PLANNING ............................................................................... 237
SECTOR VISION AND MISSION ........................................................................................................... 237
ROLE OF STAKEHOLDERS ................................................................................................................... 238
11.11.1. ISSUES, CAUSES AND PROPOSED INTERVENTIONS IN THE SUB SECTOR .............. 238
ONGOING PROJECTS ............................................................................................................................ 239
NEW PROJECTS ...................................................................................................................................... 240
CHAPTER TWELVE ................................................................................................................................ 242
MONITORING AND EVALUATION FRAMEWORK ........................................................................... 242
12.1.INTRODUCTION ....................................................................................................................................242
12.2. INSTITUTIONAL FRAMEWORK FOR MONITORING AND EVALUATION ................................................242
ANNEX I: THE COUNTY FACT SHEET ..........................................................................................................262
List of Tables Table 1: Administrative units in Baringo .............................................................................................. 27 Table 2: Registered Voters (Source: IEBC, 2012) ................................................................................. 30 Table 3: Population projections by age cohort and gender ...................................................................... 31 Table 4: Population distribution and density ......................................................................................... 32 Table 5:Population projections for selected age groups .......................................................................... 33 Table 6: Population projections by urban centre.................................................................................... 35 Table 7 Socioeconomic indicators in Baringo County ........................................................................... 38 Table 8: Road network in Baringo County ........................................................................................... 41 Table 9: Airstrips and airfields in Baringo County (Source: Chief Warden-KWS) .................................... 42 Table 10: Land use patterns in Baringo County .................................................................................... 46 Table 11: Livestock production in Baringo County: .............................................................................. 55 Table 12: Proceeds from the sale of live animals (2012) ........................................................................ 56 Table 13: Proceeds from the sale of livestock products (2012) ............................................................... 56 Table 14: Projected revenue estimates based on potential production ...................................................... 57 Table 15: Tourist class hotels/restaurants and bed Capacity ................................................................... 64 Table 16: Water sources for different Households in Baringo County ..................................................... 66 Table 17: SWOT Analysis of Baringo with respect to poverty ............................................................... 80 Table 18: SWOT Analysis of Baringo regarding gender inequality ............................................................... 81
Table 19: SWOT analysis of Baringo with respect to population growth ................................................. 82 Table 20: SWOT Analysis of Disaster Management.............................................................................. 83 Table 21: SWOT Analysis of Environment and Climate change ............................................................. 85 Table 22: SWOT Analysis of county diversity - Minority groups and regional balance ............................. 86 Table 23: SWOT Analysis of Youth .................................................................................................... 86 Table 24: SWOT Analysis .................................................................................................................. 87 Table 25: SWOT Analysis .................................................................................................................. 88 Table 26: SWOT analysis: .................................................................................................................. 89 Table 27: Policy thrusts for Agriculture and Rural Development ............................................................ 90 Table 28: Policy Thrusts for the Health Sector ...................................................................................... 91 Table 29: Policy thrusts for Environment, Water, Land and Housing ...................................................... 92 Table 30: Policy thrusts for Public Administrtaion and International Relations ........................................ 93 Table 31: Policy thrusts for Social Protection and Culture ..................................................................... 93 Table 32: Policy thrusts for Education ................................................................................................. 94 Table 33: Policy Thrusts for Energy, Infrastructure and ICT .................................................................. 95 Table 34: Policy thrusts for the General Economic, Commercial and Labour Affairs ................................ 95
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xvi
Table 35: Economic and Social rights under the Constitution of Kenya ................................................. 100 Table 36: Some development targets in Baringo County ...................................................................... 103 Table 37: Residential land use specifications for Marigat Town ........................................................... 115 Table 38: ICT Activities for building capability .................................................................................. 121 Table 39: ICT activities for enabling better services ............................................................................ 121 Table 40: ICT for fostering an Open Government ............................................................................... 122 Table 41: Using ICT for Strengtherning Collaboration ........................................................................ 122 Table 42: Using ICT for Improving Government Operations ............................................................... 123 Table 43: Using ICT to encourage Innovation .................................................................................... 123 Table 44: Consideration for resource allocation among sectors ............................................................ 140 Table 45: Weights to be assigned to different factors when selecting projects ........................................ 141 Table 46: Stakeholders and their roles in Baringo County .................................................................... 147 Table 47: Proposed Flagship Projects ................................................................................................ 149
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xvii
List of Maps and Figures Map 1: The position of Baringo County in Kenya (Source: ILRI Data) ................................................... 24 Map2: Baringo and surrounding counties – (Source: ILRI) .................................................................... 25 Map3: Elevation and rivers in Baringo (Source: ILRI Data) ................................................................... 26 Map 4: Baringo Subcounties ............................................................................................................... 28 Map 5: Administrative Wards in Baringo County ................................................................................. 29 Figure 6:Population trends in Baringo Count ........................................................................................ 32 Figure 7: Population distribution by age ............................................................................................... 33 Figure 8: Population Distribution by Age ............................................................................................. 34 Figure 9: Urban Population in Baringo ................................................................................................ 36 Figure 10: Comparison of Human Development Indicators in Baringo against national figures ................. 36 Figure 11: Human Development Indicators in Baringo .......................................................................... 37 Figure 12: Poverty rankings of Kenyan counties (Source: Gok, 2011) ..................................................... 40 Figure 13: Land Use in Baringo (Source: ILRI Data) ............................................................................ 46 Figure 14: State of co-operative societies in Baringo County as at 31/12/2013 ......................................... 48 Figure 15: Crop Production Estimates for Baringo County .................................................................... 53 Figure 16: Income distribution among cash crops ................................................................................. 54 Figure 17: A prosperous pattern for wealth creation in Baringo .............................................................. 97 Figure 18: Key Enablers for the Economy of Baringo ........................................................................... 97 Figure 19: Role of ICT in the public sector of Baringo ........................................................................ 120 Figure 20 : Development through use of public funds.......................................................................... 142 Figure 21 : Organisation of the County Government of Baringo ........................................................... 146 Figure 22: County Flagship, Geothermal and Security Roads ............................................................... 179
Field Code Changed
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xviii
Abbreviations and Acronyms
ACU AIDS Control Units
ADB African Development Bank
AFC Agricultural Finance Corporation
AGOA African Growth Opportunity Act
AI Artificial Insemination
AIDS Acquired Immune Deficiency Syndrome
ANS Age Not Specified
ARV Anti Retroviral Drugs
CACC Constituency Aids Control Committee
CAP Community Action Plan
CBHC Community Based Health Centre
CBO Community Based Organization
CDF Constituencies Development Fund
CDP County Development Profile
CEISP Community Empowerment and Institutioinal Support Projects.
CGB County Government of Baringo
CHW Community Health Worker
CIDP County Integrated Development Plan
CKDAP Central Kenya Dry Areas Project
COMEC County Monitoring & Evaluation Committee
DDO Sub County Development Officer
DRR Disaster Risk Reduction
ECD Early Childhood Development
EMCO Early Maturing Crop
FBO Faith Based Organization
FCC Forest Conservation Committees
FGM Female Genital Mutilation
FKE Federation of Kenya Employers
FTC Farmers Training Centre
GDC Geothermal Development Company
GoK Government of Kenya
HIV Human Immunodeficiency Virus
ICDC Industrial and Commercial Development Corporation
ICT Information Communication Technology
IEBC Independent Electoral and Boudaries Commission
IFAD International Fund for Agriculture Development
ILO International Labour Organisation
IT Information Technology
JICA Japan International Cooperation Agency
K REP Kenya Rural Enterprise Programme
KAM Kenya Association of Manufacturers
KAPAP Kenya Agricultural Productivity and Agribusiness Project
KARI Kenya Agricultural Research Institute
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xix
KCC Kenya Cooperative Creameries
KCPE Kenya Certificate of Primary Education
KCSE Kenya Certificate of Secondary Education
KEFRI Kenya Forest Research Institute
KENBRO Kenyan broilers
KEPI Kenya Expanded Programme for Immunization
KESSP Kenya Education Sector Support programme
KFA Kenya Farmers Association
KNBS Kenya National Bureau of Statistics
KP&LC Kenya Power and Lighting Company
KPHC Kenya Population and Housing Census
KTDC Kenya Tourism Development Corporation
KWFT Kenya Women Finance Trust
KWS Kenya Wildlife Service
LATF Local Authority Transfer Funds
MCH Maternal Child Health
MDG Millennium Development Goals
MOA Ministry of Agriculture
MoH Ministry of Health
MOPW Ministry of Public Works
MTEF Medium Term Expenditure Framework
MUAC Middle Upper Arm Circumference
MYWO Maendeleo Ya Wanawake Organisation (MYWO)
N/A Not Available
NALEP National Agriculture and Livestock Extension Programme
NCCK National Council of Churches of Kenya
NCPB Nation Cereal and Produce Board
NDMA National Drought Management Authority
NEMA National Environment Management Authority
NGO Non Governmental Organization
OVC Orphans and Vulnerable Children
PDRA Participatory Disaster Risk Analysis
PFP Partnership for Progress
PGH Provincial General Hospital
PHC Public Health Committee
PHO Public Health Office
PHT Public Health Technician
PIP Public Investment Programme
PLWHA People Living With HIV/AIDS
PMTCT Prevention of Mother to Child Transmission
PRSP Poverty Reduction Strategy Paper
PTA Parents Teachers Association
RMLF Roads Maintenance Levy Fund
SACCO Savings and Credit Cooperatives
SIDA Swedish International Development Agency
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xx
SIDC Sub County Information and Documentation Centre
SISDO Small Irrigation Support Development Organization
SSDO Sub County Social Development Officer
STD Subscriber Trunk Dialling
STDs Sexually Transmitted Diseases
STI Sexually Transmitted Infection
SWO Sub County Works Officer
SYO Sub County Youth Officer
TBA Traditional Birth Attendant
TOWA Total War Against AIDS
URTI Upper Respiratory Tract Infections
VCT Voluntary Counselling and Testing
VIP Ventilated Improved Pit (Latrine)
WRMA Water Resource Management Authority
WS Water Supply
WVK World Vision Kenya
YEDF Youth Enterprise Development Fund
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxi
Executive summary
A key objective of this County Integrated Development Plan is to identify community
developmental priorities to be implemented over the next five years.
This document will inform the preparation and implementation of sectoral plans as well as the
spatial plan for Baringo County. It is divided into twelve chapters as follows:
Chapter One: Provides the the general information, background description of the county in terms
of its area, administrative divisions, main physical features, settlement patterns, as well as a
summary of data essential for making informed choices while planning.
Chapter Two: Outlines major development challenges facing the county. In addition, it gives a
SWOT analysis on crosscutting issues being experienced in the county. An analysis of sub-sector‘s
issues as identified in the MTEF process is also discussed in the chapter, showing the policy thrusts,
causes and strategies needed to solve them.
Chapter Three: Maps out the development strategy and identifies the overall, social, economic,
environmental and infrastructural goals that need to incorporated in the development plan.The
chapter also presents some strategic considerations for the formulation of the development plan.
Chapter Four: Introduces the spatial framework for the development of the county. It establishes a
context for the development of a spatial plan, which will be developed as per the requirements of
theCounty Government Act. The development of the spatial plan should be given immediate
priority, as it is the basis of all economic industrial development in the county. This section also
identifies the major urban areas and how they are related to each other. It also briefly addresses the
issue of housing policy within the county.
Chapter Five: provides a framework for Baringo County Government to leverage ICT to increase
public sector productivity by enabling the delivery of services for the people, communities and
businesses. The adoption of ICT will also ensure open engagement and better-informed decisions as
well as improving operations.
Chapter Six: recognizes the challenges Baringo faces as far as disaster management is concerned
and provides a framework for its management. It establishes a context for PDRA and work plan
development.
Chapter Seven: Discusses the linkages between the County Integrated Development Plan, Kenya
Vision 2030 and the Constitution of Kenya. A brief status of MDGs at the county level is also
provided.
Chapter Eight: Contains a resource mobilization strategy for the county government. It indicates
the resources available for capital projects development. It outlines strategies for raising revenue
and their projections for the plan period. Strategies for asset management, financial management
and capital financing are also outlined. These include strategies to expand the revenue generation,
resource sharing with the centralgovernment and means of attracting external funding.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxii
Chapter Nine: Presents a framework for the management of investment in the county. It provides
a mechanism for selection of projects and allocation of resources to devolve public resources
beyond the county level.
Chapter Ten: Outlines the institutional framework and organisational flow to be followed in
implementing the plan. It also outlines the stakeholders in the county, their roles and how their
functions are accommodated to avoid duplication of efforts. This section also identifies the sectorial
plans that will need to be developed.
Chapter Eleven: Development programs and projects. This involves a programmatic identification
of development priorities, projects and programmes as well as the strategies to realise the said
programmes. The projects were identified by the public in ward and sub-county fora held
throughout the county.
There are also on-going priority projects and programmes in the respective MTEF sectors that had
been identified and proposed for implementation in the plan period 2008-2012. Flagship projects
relevant to the county have also been identified.The MTEF sectors are agriculture and rural
development; energy; infrastructure and ICT; general economic, commercial and labour affairs;
health; social protection, culture and recreation; justice; law and order water and housing; public
administration an internal relations; environmental protection, education and; governance.
Chapter Twelve: Elaborates on the implementation, monitoring and evaluation framework for all
the projects. It gives details in a matrix format of the implementation plans together with monitoring
and evaluation strategies. The overall M&E committees in the county will be the CMEC, which will
be mandated and facilitated to ensure its activities reflect a serious M&E agency. The CMEC will
be reporting to other development committee‘s inthe county. The proposed system is expected to
boost efficiency and ensure projects/programmes are implemented according to approved proposals
so as to realize targeted outputs and outcomes.
This county integrated development plan is informed by the national strategic direction as
articulated in the Vision 2030 that guides Kenya to become a newly industrialised middle-income
country that provides high quality life for all citizens by the year 2030. The vision is based on three
pillars namely: Economic pillar, whose key goal is to maintain a sustained economic growth of 10%
annually over the next 25 years. The second one is the social pillar, whose goal is to build a just and
cohesive society enjoying equitable social development in a clean and secure environment. The
third is political pillar, which aims at building an issue-based, people-centred, result-oriented and
accountable democratic political system.
The pillars are anchored in key foundations namely: Infrastructure, energy, science, technology and
innovation, land reforms, human resource development, security and public service.
The county fact sheet elsewhere in the CIDP presents a broad range of the county statistics at a
glance. It captures factual information such as county area, ecological and climatic conditions and
demographic features. The socio-economic indicators and basic data in specific sectors are also
provided, as they have a direct bearing on the county‘s development agenda and poverty reduction
strategies.
In conclusion, a well-managed devolution of functions from the national government as provided in
the constitution is predicted to spur unprecedented development in Baringo County. The realisation
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxiii
of the county‘s development agenda is pegged on adequate and timely disbursement of funds,
proper coordination in implementation of development activities and robust monitoring and
evaluation system for ongoing programmes and projects funded through internal and external
resources.
It is, therefore, recommended that a CMEC is formed and mandated to spearhead monitoring and
evaluation at the county level. The CMEC should be composed of members representing national
and county government agencies, civil society organisations and other stakeholders. This plan
proposes that the head of this committee be domiciled and answerable directly to the governor or
his appointee.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 24
Chapter One
The Profile This chapter gives background information on the socio-economic and infrastructural
information that have a bearing on the development of the county. The chapter provides
description of the county in terms of the location, size, physiographic and natural conditions,
demographic profiles as well as the administrative and political units. In addition, it provides
information on infrastructure and access; land and land use; community organisations/non-state
actors; crop, livestock and fish production; forestry, environment and climate change; mining;
tourism; employment and other sources of income; water and sanitation; health access and
nutrition; education and literacy; trade; energy; housing; transport and communication;
community development and social welfare. Detailed data is presented in the fact sheet given in
Annex I.
Map 1: The position of Baringo County in Kenya (Source: ILRI Data)
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 25
1.1. Location and size
Baringo is one of the 47 counties in Kenya. It is situated in the Rift Valley region. It borders
Turkana and Samburu counties to the north, Laikipia to the east, Nakuru and Kericho to the
south, Uasin Gishu to the southwest, and Elgeyo-Marakwet and West Pokot to the west. It is
located between longitudes 35 30‘ and 36 30‘ East and between latitudes 0 10‘ South and 1 40‘.
The Equator cuts across the county at the southern part. Baringo covers an area of 11,015.3 sq
km of which 165 sq km is covered by surface water- Lake Baringo, Lake Bogoria and Lake
Kamnarok.
Map2: Baringo and surrounding counties – (Source: ILRI)
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 26
1.2. Physical features
1.2.1. Topography
As shown in Map 3, Baringo varies in
altitude between 3000m above mean sea
level at its highest points and nearly 700m
above mean sea level at its low points.
Map3: Elevation and rivers in Baringo
(Source: ILRI Data)
One of the prominent features is the
Kerio Valley, which is situated on the
western part of the county. In the
eastern part of the county near Lake
Baringo and Bogoria is the Loboi
Plain covered mainly by the
latchstring salt-impregnated silts and
deposits. The Tugen Hills form a
conspicuous topographic feature in the
county. The trend of the hills is north-
south and mainly consists of volcanic
rocks. The hills have steep slopes with
prominent gullies. On the eastern and
western parts of the hills are
escarpments. Rivers on the hills flow
in very deep gorges.
1.2.2. Water bodies
The floor of the Rift Valley owes its origin to the tectonic and volcanic disturbances, which
have dislocated surfaces, forming separate ridges. The troughs of the rift that have a north-
south alignment are occupied by Lake Baringo and Bogoria, which occupy 164km2. Lake
Bogoria is particularly spectacular because it is one of the few hot water lakes in the world.
Lake Kamnarok covers 1km2.
1.2.3. Ecological conditions
Exotic forests exist in the county but the known indigenous forests are found in Kabarnet,
Kabartonjo, Tenges, Lembus, Saimo, Sacho and Ol‘ Arabel and Eldama Ravine. The main
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 27
exotic species are: Grevellea Rabusta, Cuppressus lusitanicand Eucalyptus saligna.
Prosopis juliflora also exists in Marigat area.Kipng‘ochoch forest in Sacho, one of the 10
forest blocks under Tenges forest station, is an example of a well conserved indigenous
forest where visitors and nature lovers could view the entire Lake Baringo basin, fluorspar
mines, Laikipia ranges, Elgeyo escarpment, Kerio Valley and other touristic attractions that
the county offers.The county is classified as arid and semi-arid. Most parts of East Pokot,
Baringo Central, Baringo South, Baringo North, Mogotio sub-counties are arid and semi-
arid except for Koibatek sub-county, which is in a highland zone.
1.2.4. Climatic conditions
The rainfall varies from 1,000mm to 1,500mm in the highlands to 600mm per annum in the
lowlands. Due to their varied altitudes, the sub-counties receive different levels of rainfall.
Koibatek sub-county receives the highest amount of rainfall. The lowland sub-counties of
Mogotio, East Pokot and Baringo North receive relatively low amounts. The temperatures
range from a minimum of 10°C to a maximum of 35°C in different parts of the county.
Average wind speed is 2m/s and the humidity is low.The climate of Baringo varies from
humid highlands to arid lowlands while some regions are between these extremes.
1.3. Administrative and political units
1.3.1. Administrative units (sub-counties, wards, locations)
The county is made up of six sub-counties namely: Mogotio, Koibatek, Marigat, Baringo
Central, Baringo North and East Pokot. The sub-counties are further divided into 30 wards
(divisions) and 116 locations. Table 1 shows the administrative units in Baringo County.
Table 1: Administrative units in Baringo
Sub County Area Km2 Number of
Wards/
Divisions
Number of
Locations
Number of
Electoral
Wards
Mogotio 1314.6 5 24 3
Koibatek 1002.5 4 16 6
Marigat 1678 3 17 4
Baringo Central 799.9 4 21 5
Baringo North 1703.5 4 14 5
East Pokot 4516.8 6 24 7
Total 11015.3 26 116 30
Source: KNBS, Baringo, 2013
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 29
Map 5: Administrative Wards in Baringo County
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 30
1.3.2. Political units
The county has six constituencies, namely, Mogotio, Eldama Ravine, Baringo Central,
Tiaty, Baringo North and Baringo South. The County has 30 county assembly wards and
171,344 registered voters as indicated in the table 2 below.
Constituency No. of
county
assembly
wards
Names of the wards 2013
Eligible
voters
Registered
voters
Baringo North 5 Barwessa/Kabartonjo/Saimo
-Kipsaramaan/Saimo Soi/Bartabwa
44,930 33,044
Baringo Central 5 Kabarnet/Sacho/Tenges/Ewalel-
Chapchap and Kapropita
37,000 29,000
Eldama Ravine 6 Lembus/Lembus
Kwen/Ravine/Mumberes-
MajiMazuri/Lembus- Perkerra and
Koibatek
49,078 38,252
Mogotio 3 Mogotio/Emining and Kisanana 27,576 23,997
Tiaty 7 Tirioko/Kolowa/Ribkwo/Silale/Loi
yamorok/Tangulbei-Korossi and
Churo-Amaya
48,826 20,415
Baringo South 4 Marigat/Ilchamus/Mochongoi and
Mukutani
37,000 26,636
Total (County) 30 244,410 171,344
Table 2: Registered Voters (Source: IEBC, 2012)
As indicated in Table 2, the total number of registered voters in the county in 2012 was
171,344 against the eligible voter population of 244,410. The sub-county with the lowest
registered voters was East Pokot with 40 percent population of registered voters. The
constituency with the highest percentage of registered voters was in Eldama Ravine
constituency with 80 percent of the eligible voters being registered.The IEBC needs to
conduct more civic education and registration to increase the number of registered voters,
especially in Baringo East and Baringo North constituencies.
1.4. Demographic attributes
1.4.1. Population size and composition
According to the population and housing census conducted in 2009, the population size of
Baringo County was 555,561, consisting of 279,081 males and 276,480 females. The
county‘s inter-censal growth rate is 3.3 per cent per annum, which is above the national
average of 3 per cent. The population of the county is estimated to be 613,376 in 2012 and is
further projected to increase to 677,209 and 723,411 in 2015 and 2017 respectively. Table 3
shows the population projections by gender and age cohort for the county.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 31
Table 3: Population projections by age cohort and gender
Age
Cohort
2009
(Census) 2012
(Projections)
2015
(Projections)
2017
(Projections)
Male Female Total Male Female Total Male Female Total Male Female Total
0-4 46950 44569 91519 48525 49207 101043 57230 54328 111558 61135 58035 119169
5-9 47011 44752 91763 51903 49409 101312 57305 54551 111856 61214 58273 115724
10-14 44302 41504 85806 48912 45823 94736 54002 50592 104594 57687 54044 108212
15-19 34292 30641 64933 37861 33830 71690 41801 37350 79151 44653 39899 81888
20-24 23109 24818 47927 25514 27401 52915 28169 30252 58421 30091 32316 60442
25-29 18006 20843 38849 19880 23012 42892 21949 25407 47355 23446 27140 48993
30-34 13797 15047 28844 15233 16613 31846 16818 18342 35160 17965 19593 36376
35-39 11655 12447 24102 12868 13742 26610 14207 15172 29379 15176 16208 30396
40-44 8457 9106 17563 9337 10054 19391 10309 11100 21409 11012 11857 22149
45-49 7794 8182 15976 8605 9033 17639 9501 9974 19474 10149 10654 20148
50-54 6225 6024 12249 6873 6651 13524 7588 7343 14931 8106 7844 15447
55-59 4829 4510 9339 5333 4979 10311 5886 5498 11384 6288 5873 11778
60-64 4257 3996 8253 4700 4412 9112 5189 4871 10060 5543 5203 10408
65-69 2508 2656 5164 2769 2932 5701 3057 3238 6295 3266 3458 6512
70-74 2145 2498 4643 2368 2758 5126 2615 3045 5660 2793 3253 5855
75-79 1393 1613 3006 1538 1781 3319 1698 1966 3664 1814 2100 3791
80+ 2290 3215 5505 2528 3550 6078 2791 3919 6710 2982 4186 6942
Age N/S 61 59 120 67 65 132 74 72 146 79 77 151
TOTAL 279081 276480 555561 308124 305252 613376 340189 337020 677209 363399 360012 723411
Source: KNBS (2009), KPHC
(Age NS = Age not shown)
According to the table, in 2012 the categories between 0-4 and 5-9 age groups had the
largest populations of 101,043and 101,312. The gender distributions in the same age groups
were 51 per cent male and 48 per cent female respectively for the 0-4 age group and 5-9 age
groups. The cohorts with the lowest population are those whose age is between 75-79 years,
with 46 per cent male and 53 per cent female.
1.4.2. Population density and distribution
The population density is influenced by the climatic conditions, topography, soil
composition, infrastructure and land ownership. Table 4 shows the population density and
distribution in the county. The county's average population density was 50 persons per
square kilometer in 2009 and is projected to be 55 in 2012 and approximately 60 by 2017.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 32
Figure 6:Population trends in Baringo Count
Table 4: Population distribution and density
Sub County Area 2009 Census 2012 Projections 2015 Projections 2017 Projections
Population Density Population Density Population Density Population Density
Mogotio 1325 60,959 46 67,303 51 74307 56 79376 60
Koibatek 1002 105,273 105 116,228 116 128324 128 137079 137
Marigat 1663 73,177 44 80,792 49 89200 54 95286 57
Baringo Central 803 89,174 111 98,454 123 108700 135 116116 145
Baringo North 1705. 93,789 55 103,549 61 114325 67 122125 72
East Pokot 4592 133,189 29 147,049 32 162352 35 173429 38
Total/ Average 11,090 555,561 50 606,060 55 661148 60 700628 63
Source: KNBS, Baringo 2012
As indicated in Table 2, East Pokot Sub-county has the highest population of 133,189
followed by Eldama Ravine Sub-county with a population of 105,273 (according 2009
Population and Housing Census). The sub-counties with the lowest population are Mogotio
and Marigat. The settlement pattern in the county is influenced by urbanization and
availability of arable and grazing land. The county is predominantly inhabited by the Tugen
community. The Ilchamus, Turkana, Kikuyu and Nubians communities are the minorities in
the county among a few other sub-tribes. Table 5 gives population projections for selected
age groups. The groups covered include under 1 year, the under 5 years, primary school age,
secondary school age, youthful population, female reproductive age, the labor force and the
aged.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 33
Table 5:Population projections for selected age groups
Age group
2009
(Census) 2012 (Projections) 2015 (Projections) 2017 (Projections)
Male Female Total Male Female Total Male Female Total Male Female Total
Under 1 year 9813 9275 19088 10834 10240 21074 11962 11306 23266 12778 12077 24855
Under 5 years 56734 53651 110385 62638 59234 121872 69157 65399 134555 73875 69860 143735
Primary school Age
(6-13) 73187 69479 142666 80803 76709 157513 89212 84692 173905 95299 90471 185769
Secondary School
age (14-17) 30614 27894 58508 33800 30797 64598 37317 34002 71319 39863 36322 76185
Youth Population
(15-29) 75407 76302 151709 83254 84242 167497 91918 93009 184928 98190 99355 197545
Female reproductive
age (15-49) 121084
0 133685 133685 0 147597 147597 0 157667 157667
Labour force (15-64) 132421 135614 268035 146202 149727 295928 161416 165308 326725 172429 176587 349016
Aged Population
(65+) 8397 10041 18438 10834 10240 21074 11961 11306 23268 12778 12077 24855
Source: KNBS, 2012
Below is an analysis of the population projections for the selected age groups based on the
figures in Table 5:
Figure 7: Population distribution by age
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 34
Figure 8: Population Distribution by Age
Under 1: The population below the age of one year was 19,088 in 2009 and is projected to
rise to 21,074 in 2012 and 24,855 in 2017. This age group will grow at a low rate, thus the
pressure on the population to provide for this age group will be minimal. There is need,
however, to improve the facilities that cater for this age group in order to correspond with
the increased population.
Under 5: This population is projected to grow from 110,385 in 2009 to 121,872 in 2012
before rising further to 143,735 in 2017. There is need to increase the immunisation
coverage to improve child survival rate. Early Childhood Development (ECD) centres and
other educational facilities should be provided in order to accommodate the increased
numbers.
Primary school going age (6 -13): The total population in this age group is projected to
increase from 142,666 in 2009 to 157,513 in 2012 and to 185,769 in 2017. This increased
number will constrain the primary education facilities. The county should, therefore, focus
on increasing these facilities.
Secondary school going age (14-17): In 2009, the population for this age group was
58,508. It is projected to increase to 64,598 in 2012 and 76,185 in 2017. There is need to
expand the existing secondary school facilities to cater for the increasing numbers. In
2009/2010 financial year, the government through the Economic Stimulus Programmes
developed centres of excellence in the county but more needs to be done.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 35
Youth population (15-29): From the 2009 census, the county had a total of 151,709 with
male and female population being 75,407 and 76,302 respectively. This represents an
average of 30% of the total population, indicating that the county has a high demand for
middle level training colleges.
Female reproductive age (15-49): This group comprises of the female reproductive age.
The total female reproductive age population was 121,084 in 2009 and is projected to be
133,685 in 2012 before rising to 157,667 in 2017. This implies that there is a need to
increase resources going towards improving maternal and child care health services and
nutrition standards. In addition, there is need to intensify reproductive health and family
planning education in order to check population growth in the county.
Labour force (15-64): The County‘s labour force in 2009 was 268,035 and is projected to
rise to 295,928 in 2012 before rising further to 349,016 in 2017. The bulk of the labour force
is either semi-skilled or unskilled and is mainly engaged in agricultural activities. This calls
for more investments in job creation opportunities in the county to absorb this ever-
increasing population.
The aged (65 years and above): The 2009 aged population was 18,438, and it is projected
to increase to 21,074 in 2012 and 24,855 in 2017. There is need to upscale programmes
catering for the aged, including increasing funding from the cash transfer programme.
Table 6 shows population projections for the urban centers of Timboroa, Marigat, Maji
Mazuri, Mogotio, Eldama Ravine and Kabarnet.
Table 6: Population projections by urban centre
Urban centre
2009
(Census) 2012 (Projections) 2015 (Projections) 2017 (Projections)
Male Female Total Male Female Total Male Female Total Male Female Total
Timboroa 1551 1599 3150 1712 1765 3478 1891 1949 3840 2020 2082 4102
Marigat 3303 3358 6661 3647 3707 7354 4026 4093 8120 4301 4373 8673
Maji Mazuri 2193 2072 4265 2421 2288 4709 2673 2526 5199 2856 2698 5554
Mogotio 1808 1893 3701 1996 2090 4086 2204 2307 4511 2354 2465 4819
Eldama Ravine 8711 9161 17872 9618 10114. 19732 10618 11167 21785 11343 11929 23272
Kabarnet 8218 9427 17645 9073 10408 19481 10017 11491 21509 10701 12275 22976
Total 25784 27510 53294 28467 30373 58840 31430 33534 64963 33574 35822 69396
Source: KNBS, Baringo, 2009
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 36
Figure 9: Urban Population in Baringo
There are two major urban centres in the county, namely, Kabarnet and Eldama Ravine.
Timboroa, Marigat, Maji Mazuri and Mogotio are growing and need urgent proper urban
planning to avoid slum dwellings. The town with highest population in 2009 was Eldama
Ravine with a population of 17,872 followed by Kabarnet with 17,645. The population for
the two towns is projected to be 19,732 and 19,481 respectively, in 2012.]
1.5. Human development indicators
The Human Development Indicators (HDI) measure human development based on the basic
factors of a long and healthy life, the acquisition of knowledge and a reasonable standard of
living. These factors are measured by considering aspects such as education, healthy living,
access to social amenities, the position and condition of women and gross domestic product.
Figure 10: Comparison of Human Development Indicators in Baringo against national figures
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 37
Indicator County Index National Index
Human Development Index 0.5656 0.5506
Youth Development Index 0.5952 0.5817
Gender Development Index 0.50
Human Poverty Index 0.30 0.29
Figure 11: Human Development Indicators in Baringo
From the human development report of 2009, the human development index for the county
is 0.5656 which is above the national average of 0.5506. The human poverty index is 30.6
per cent compared to the national level of 29 per cent.
1.5.1. Youth Development Index (YDI)
The YDI is a composite measure of youth development. The index is a tool developed to
raise visibility of youth issues by monitoring the changes that occur in the youth over time.
The youth development index at the county is 0.5952, which is above the national index,
which is 0.5817
1.5.2. Gender Development Index (GDI) and Gender Empowerment Measure
(GEM)
The GDI is a measure of human development that adjusts the HDI for disparities between
men and women. It is, therefore, not a measure of gender inequality. GDI is a basic measure
of how gender inequalities in knowledge acquisition, longevity and health, and standard of
living affect human development.
GEM measures gender equity in political and economic power by assessing the level of
female representation. It considers gender gaps in political representation, professional and
management positions, and earned incomes. It captures gender inequality in political
participation, as measured by the percentage of seats held by women in national parliaments;
economic participation and decision-making power, measured by the percentage of women
among legislators, senior officials, and managers in professional and technical fields; and
power of economic resources measured by the estimated earned income of women and men.
On the other hand, the gender development index for the county is 0.50 per cent. The above
indices show that the county is generally underdeveloped.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 38
1.5.3. Summary of socio-economic indicators of Baringo County
Table 7 Socioeconomic indicators in Baringo County
Year Indicator Value
(%)
2009 Urban households access to electricity 38.5
2009 Rural households access to electricity 4.7
2009 Access to main sewer, septic tank or cess pit urban 0.3
2009 Access to main sewer, septic tank or cess pit rural 7.6
2009 Pre-primary education 17.5
2009 Primary education 67.7
2009 Secondary education 11.7
2009 Tertiary education, university or youth polytechnic 3
2005 Incidence of flu 45.9
2005 Incidence of fever/malaria 14.9
2005 Kenya average flu incidence 15
2005 Kenya average Fever/Malaria incidence 41.4
2009 Employed (age 5 and over) female rural 83.5
2009 Seeking jobs (aged 5 and over)female rural 30.3
2009 Economically inactive (aged 5 and over)female rural 4.7
2009 Employment status unclassified (aged 5 and over)female rural 43.9
2009 Employed (age 5 and over) male rural 82.7
2009 Seeking jobs(aged 5 and over) male rural 37.8
2009 Economically inactive (aged 5 and over) male rural 5.8
2009 Employment status unclassified (aged 5 and over)male rural 32.1
2009 Employed (age 5 and over) female urban 85.1
2009 Seeking jobs (aged 5 and over)female urban 31.6
2009 Economically inactive (aged 5 and over)female urban 6.7
2009 Employment status unclassified (aged 5 and over) female urban 43
2009 Employed (age 5 and over) male urban 82.4
2009 Seeking jobs (aged 5 and over) male urban 39.6
2009 Economically Inactive (aged 5 and over)male urban 7.7
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 39
Year Indicator Value
(%)
2009 Employment status unclassified (aged 5 and over)male urban 31.9
2005 Morbidity rates male 29.3
2005 Morbidity rates female 34.2
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 40
1.5.4. Poverty levels
The chart below indicates the poverty rankings of Kenyan counties. As can be seen, with 60% poverty, Baringo is 15th
.
Figure 12: Poverty rankings of Kenyan counties (Source: Gok, 2011)
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 41
1.6. Infrastructure and access
1.6.1. Road, rail network, airports and airstrips
A modern and well-maintained physical infrastructure is a key catalyst to economic growth
and poverty reduction. The county does not have a good road network. It has a total
2912.55km of road with Class D, E, G, R and U having 339.22km, 1810km, 20.85km,
185.11km, and 557.37k respectively. The roads are mainly earth and mixed type. These
roads are usually impassable during the rainy season. This impedes livestock marketing,
which is the main source of livelihood for majority of the residents. There are four airstrips
in the county and no airport, ports or jetties.
Table 8: Road network in Baringo County
Class Description Length (Km)
A International link roads LAPPSET Proposed
100km
B National trunk roads – linking provinces and counties
C Primary roads – linking important centres or to higher class roads
D Secondary roads – linking important centres together 339.22
E Minor roads – linking minor centres 1810
G Government roads 20.85
R Rural access roads 185.11
S Sugar roads 0
T Tea roads 0
U Unclassified roads 557.37
W Wheat roads 0
2912.55
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 42
Baringo County also has the following aviation facilities
Table 9: Airstrips and airfields in Baringo County (Source: Chief Warden-KWS)
Airstrip Condition Remarks
Kabarnet
Airfield
Serviceable
Tarmacked with1.7km runway
Gazzetted
Has an all-weather access road to Kabarnet town, parking bay
and security housing. Urgently requires rehabilitation as well as
windsock replacement.
Kimalel Airstrip Partially serviceable
Dirt surface
Gazzetted
Apron and access under encroachment
Marigat Airstrip Unserviceable
Dirt surface
Gazzetted
Apron and access under encroachment
Lake Baringo
Airstrip
Serviceable
Dirt surface
Gazzetted
Currently handling tourist traffic.
Urgently requires rehabilitation and facility provision. On the
western shores of the lake
Loboi Landing
Strip
Unserviceable
Not gazzetted
Airstrip has been submerged in Lake Bogoria
Eldama Ravine
FTC Airstrip
Unserviceable and Gazzetted Land under cultivation. Urgently requires restoration
Kamara Airstrip Disused and decommissioned Area demarcated for settlement
Tinomoi
Landing Strip
Disused Land under dispute
Kiserian
Airstrip
Currently under reconstruction On the eastern shores of Lake Baringo
Mukutani
Airstrip
Partially serviceable Needs rehabilitation
Loruk Airstrip Disused Urgently requires reconstruction. Land is available and has
been set aside.
Tangulbei
Airstrip
Disused Urgently requires reconstruction. Land is available
Churo Airstrip Disused Urgently requires reconstruction. Land is available
Arus Aistrip Serviceable Needs rehabilitation and expansion
Nginyang
Airstrip
Serviceable Needs rehabilitation and expansion
Maron Airstrip Disused Needs rehabilitation
Kapedo Airstrip Partially serviceable Needs rehabilitation. Jointly used by Baringo and Turkana
Barpelo Airstrip Not in use N/A
Ngoron Airstrip Never took off Land available
Kinyach
Airstrip
Serviceable Needs expansion
TukTuk Proposed Land available – under grazing
There are several helipads in all the sub-counties though not officially gazetted. All landings
are at the discretion of the pilots. These include school playfields, forest glades, bare hilltops
and open grasslands.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 43
1.6.2. Posts and telecommunications: Posts offices, mobile telephony and
landline
The Postal Corporation of Kenya and other registered courier operators currently provide
mail and parcel delivery services in rural and urban areas with nine post offices in various
urban areas across the county. Most of the fixed telephone lines provided by Telkom Kenya
in the county have been vandalised. However, there is mobile telephone coverage in various
parts of the county in varying degrees. Koibatek Sub County has the highest mobile phone
coverage in the county with 65.3 per cent, while East Pokot has the lowest mobile phone
coverage of 16.8 per cent. Generally the county has an average mobile coverage of 45 per
cent, which is very low.
1.6.3. Financial Sector: Banks, SACCOS and Micro-Finance Institutions
The main banks operating in the county are: Kenya Commercial Bank, Barclays, Equity
Bank and Transnational Bank, all of them in major urban areas. Some of these banks use
agents to dispense their services in the local shopping centres and villages.
Post Bank, KADET, KWFT and Faulu also have a presence in the county. Other financial
institutions in the county are: Baringo farmers SACCO, Boresha Sacco, Sabatia Farmers
Co-operative Society and Torongo Farmers Co-operative Society.The county is also
extensively served with mobile money transfer agents.
1.6.4. Education institutions
The county has 656 primary schools with total enrollment of 143,017pupils. Since the
introduction of free primary education, remarkable improvement in enrollment has been
observed. The county‘s performance in national examination has greatly improved over the
years in spite of the unique challenges facing pupils.
On the other hand, there are 125 secondary schools with a total enrolment of 27,374 students
as at 2012. Among notable challenges facing the sector include, harsh climatic conditions,
especially in the lower parts of the county, insecurity that often results in the closure of
some schools, poor infrastructure, prolonged drought, recurrent floods, high illiteracy rates
and retrogressive cultural practices.
Development of human capital through capacity building programmes is one avenue for
creating resilient communities. Education is important in achieving this objective as it
inculcates skills and competencies necessary for productive participation in economic
activities. However, Baringo County education sector is characterised by low enrolments,
low retention and transition rates and low completion rates. The high school dropout and
low transition are attributable to insecurity, food insecurity, retrogressive cultural practices,
spatially inadequate education infrastructure and poor staffing levels. The county
government shall support and partner with development agencies in peace building efforts
and peace-dividend project/programmes, upscale and expansion of diverse school feeding
programmes, including food-for-education initiatives, investment in low cost boarding
schools, establishment of income-generating activities (IGAs) in boarding schools to support
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 44
initiatives for child rescue from FGM and early marriages. The county government shall
also mobilise resources for consistent funding for education bursary schemes, ECD facilities
and improvement of staffing by training and deployment of teachers. It shall also support
informal education and vocational training programmes by funding establishment and
staffing of relevant institutions.
The county has 12 polytechnics, one public teacher training college, six commercial colleges
and one university campus. The adult literacy classes‘ enrollment as of 2011 was 2,506.
1.6.5. Energy access
In the recent past, the government, through the rural electrification programme in
collaboration with the Kenya Power Company, has increased the electricity connectivity in
the rural areas of the county. Electricity connections in the county stand at 10,400 with a
connection of 2,346 connections in the year 2010-2011 alone.Baringo County has a potential
of geothermal energy production around Lake Bogoria and Silale in East Pokot. Tullow Oil
Company has established a base in the county, Block 12A, to conduct oil exploration.
Government-owned Geothermal Development Company has also started drilling geothermal
energy at Silale area in East Pokot Sub County. This new developments will spur
development growth in the county.
The county government shall support and partner with other development agencies to ensure
wider access to energy by households, institutions and businesses. This will attract
investments and open up new opportunities for cottage industry and value addition, which
will lead to increased employment and citizen participation in the county economy. The
county government shall also mobilise resources for research and development of alternative
energy sources that will exploit existing and potential resources such as Prosopis julifera for
electricity generation, Jatropha circus for bio-diesel, locally available biomass for biogas
besides options in geothermal, solar and wind energy.
1.6.6. Markets and urban centres
There are two urban centres in the county: Kabarnet and Eldama Ravine. Marigat, Maji
Mazuri, Mogotio, Timboroa and Kabartonjo are upcoming urban centres. None of the urban
centres in the county has a sewerage facility but all are supplied with electricity. Kabarnet,
Eldama Ravine and Timboroa have a good supply of water while Mogotio, Maji Mazuri and
Kabartonjo do not have a good supply of running water.
Under Economic Stimulus Programme Markets, infrastructure was improved with
construction of new structures in Marigat, Baringo North and Mogotio sub counties. Jua kali
sheds were also built in Baringo Central and Mogotio counties.
1.6.7. Housing types
The main types of roofing in the county are corrugated iron sheets at 60 per cent followed by
grass-thatched roofing estimated to be 40 per cent. Other types of roofing are: Tiles, concrete
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 45
asbestos, makuti and mud among others. The main wall materials used in construction in the
county are wood and mud estimated at 66 per cent according to the 2009 national population
and housing census. This is followed by wood only at 33 per cent. Other walling materials are
stone, brick and block, mud and cement, corrugated iron sheets, grass/reeds and tin, among
others.
Government housing facilities in the county are few. In Baringo Central, there are 170
government houses while in Mogotio and Eldama Ravine there are 214 housing units.
1.7. Land and land use
The county can be divided into two major zones: the highlands and the lowlands. The higher
elevations of the county are in the modified tropical zones with soils that are generally well
drained and fertile. This zone contains the high potential areas for agricultural and improved
livestock development. In the Tugen Hills, coffee is grown in small scale while food crops like
cereals, fruit trees and horticultural crops are also cultivated. These agricultural activities are
combined with elaborate soil conservation measures. In the southwest part, there is large-scale
farming of cereals and horticultural crops, while Kerio Valley has potential for cotton
production.
The lowlands are in a semi-arid to arid climatic zone. They have complex soils with various
textures and drainage conditions which have developed from alluvial deposits. Some of these
soils are saline. A large area is characterised by shallow stony sandy soils with rock outcrops,
volcanic ash and lava boulders. This zone is essentially a rangeland and apart from scattered
isolated pockets of dryland subsistence agriculture and small-scale irrigation in Marigat,
Kollowa and Barwessa, the major socio-economic activities centre on livestock and bee
keeping.
Although much has been done, a large part of the county‘s potential is yet to be developed.
Most of the highlands can be developed by the introduction of effective and efficient methods
of soil conservation and land management. In the lowlands, the main issue is lack of adequate
moisture for crop growth. This means development of adaptable rainwater harvesting and
storage technologies, irrigated cultivation and introduction of drip irrigation and drought
resistant crops can improve the livelihoods of the farmers in the area. Indeed, adaptable land
use planning and zoning is necessary but not limited to designation of rural and urban
settlements, irrigation, rangelands, conservancies and riparian areas.
The county government shall invest in, and support development partners in community
mobilisation and capacity building on adaptable technologies responsive to the adverse impacts
of climate change and ASAL conditions. This will aim at creating settlement zones away from
areas mapped as disaster prone, while allowing for mechanisation and other adaptable
technologies, which enhance economies of scale and sustainable natural resource use.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 46
Table 10: Land use patterns in Baringo County
Status of land Ideal land use
45% too steep or too dry for agriculture (Inner lowland and lower midland ranching zones) except in alluvial
valley soils with ground water suitable for irrigation
35% semi –arid, risky for agriculture Maize, sunflower and marginal cotton are grown on alluvial pans
with ground water. Good for cotton growing on limited acreage and
livestock keeping.
12% semi-arid, weak
Performance in agro-humid seasons
Maize, sunflower and marginal cotton are grown on alluvial pans
with ground water. Good for cotton growing on limited acreage and
livestock keeping.
From the above map it is clear that the county is majorly semi-arid with few pockets suitable
for intensive agriculture. Mixed farming is mainly found in the highland areas.
Figure 13: Land Use in Baringo (Source: ILRI Data)
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 47
1.8. Mean land holding size
From the above map it is clear that the county is majorly semi-arid with few pockets suitable
for intensive agriculture. Mixed farming is mainly found in the highland areas whereas
pastoralism is majorly practiced in arid regions. Average land holding in the county is
approximately 2.5 hectares per household. In most parts of the county, the land has not been
demarcated and pastoralism is practiced.
1.8.1. Percentage of land with title deeds
Most land in the county is under trust and is owned by the community. About 30 per cent of
land is demarcated and owners issued with title deeds. Eldama Ravine and Baringo Central
sub counties have the higher numbers of title deeds issuance compared to Baringo North,
Marigat and East Pokot sub counties.
1.8.2. Landlessness in Baringo
The county has low incidence of landlessness since most of the land in the county is
communal. However, there is presence of squatters near the urban centers of Mogotio and
Marigat.
1.9. Community organisations/non-state actors
There are various community organisations operating in the county and are mostly involved
in relief operations, water actitivies, HIV and AIDS, civic education and disaster
management. Some operate under religious organisations while others are under the
communities. Development activities undertaken by these organisations vary both in nature
and magnitude. Some have small focal areas like sub counties, divisions, locations or sub-
locations where health and sanitation services, food production and nutrition, and early
childhood education activities are being undertaken. Some Community Based Organisations
(CBOs) are engaged in health, childcare, civil education, environment conservation and
community capacity building. Some women groups are engaged in dairy, poultry farming,
tree nursery, HIV and AIDS and revolving loans, among other activities.
The county government through the County Disaster Risk Management Committee shall
enhance community organisation by supporting participatory processes for DRR
mainstreaming and formation and capacity building of community DRR organisations and
structures. This will lead to improved community capacities to manage disasters and
spearhead implementation of programmes for resilience building. The main objective of this
approach will be to end disaster emergencies in order to unlock resources for development
initiatives.
1.9.1. Cooperative societies
The Co-operatives Department in Baringo promotes guides and supervises the activities of
all types of cooperative societies to ensure viable development and to improve the members‘
economic well being. There are approximately 146 registered cooperative societies in the
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 48
county. Out of these, 82 are active, while 66 are dormant. Total membership is 87,998 —
68,626 males and 19,372 females. Share capital is 2,476,125,040. Gross turnover is
831,947,396. Details are as indicated in the table below.
Type of society Count Status Membership Share capital Gross
turnover
Active Dormant Male Female
Urban Saccos 37 23 14 6,240 3692 2,202,665,385 432,047,206
Rural Saccos 12 7 4 19,930 12,318 249,422,258 127,193
Cotton 3 - 2 - - 40940 -
Coffee 22 17 5 32,767 557 529,192 14,346,666
Jua Kali 3 - 4 - - - -
Transport 2 - 2 - - - -
Multipurpose 5 - 5 - - - -
Dairy 22 11 11 8,470 2,266 18,259,765 335,496,919
Matatu sacco 11 11 - 163 18 338,500 59,412
Consumer Sacco 5 - 5 - - - -
Bee Keeping 4 2 2 220 80 80,000 150,000
Housing 2 1 1 No
records
- - -
Poultry 2 0 2 - - - -
Agricultural 1 1 - - - - -
Unions 2 1 1 - - - -
Ranching/livestock
marketing
6 3 3 354 177 415,000 4,200,000
mining 1 - 1 -- - - -
Cereal
produce&buying
4 2 2 85 35 84,000 3,120,000
Irrigation 3 2 1 278 202 4,200,000 42,000,000
Fisheries 1 1 - 119 27 90,000 400,000
Aloe Vera Utilization 1 - 1 - - - -
TOTALS 149 82 66 68,626 19,372 2,476,125,040 831,947,396
Figure 14: State of co-operative societies in Baringo County as at 31/12/2013
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 49
1.9.2. Non-governmental and international organisations
The following are the non-governmental organisations in the county: Action Aid, ACTED,
World Vision Kenya, Kenya Red Cross Society, International Union for Conservation of
Nature (IUCN), Koibatek Socio-Environmental Organisation (KOSEO) Enderois Welfare
Council, Worldwide Fund for Nature (WWF), SNV –Netherlands, NECOFA, BARECARE,
Women Organization Fighting Against Aids (WOFAK), Habitat for Humanity, Friends of
Ravine Women Empowerment Organisation (FOREWO) and Baringo Advocacy and
Development Organisation (BADO), World Food Programme (WFP) and
UNICEF/UNOPS.
They are key partners in enhancing the socio-economic wellbeing of the county‘s residents.
1.9.3. Self help, women and youth groups
Self-Help groups, women and youth groups play an important role in resource
mobilisationand improving the lives of individuals and families. There are 3375 women
groups, 4610 self-help groups, 2183 youth groups and 85 special groups (people living with
disability, those living with HIV and AIDS and groups of the elderly). They are engaged in
transport, environment, HIV and AIDs, business, dairy farming, tree nursery, revolving
loans, bee keeping, community facilitation, jua kali and training support among other social
economic activities.
1.9.4. Orphans and vulnerable children-cash transfer.
The county is receiving funds under the orphans and vulnerable children cash transfer from
the National Council for Children Services.Currently, 2259 households are in the cash
transfer programme in four sub-counties: Baringo Central, Marigat,Koibatek and Mogotio.
During the 2013 financial year, over KES 54,216,000 was given to the households.
In the 2013/14 financial year, the programme will be scaled up in some uncovered locations
an in East Pokot and Baringo North.
1.9.5. Kabarnet Vocational Rehabilitation Centre (KVRC)
The centre is one of the 14 established nationally with the purpose of providing basic live
skills like carpentry, welding, tailoring, leatherwork and computer training mainly to
persons with disability but also to integrated able-bodied persons. The facility is located on a
20-acreland in Kabarnet town. The courses take between 1-2 years and the participants
graduate with trade test certificate. There are plans of elevating it to offer courses leading to
a diploma certificate. Currently, the centre has 15 trainees and is seeking to recruit more.
The centre is also used as a seminar/conference/training facility to programmes like ECDE,
therefore generating revenue. There is room for further improvement by the county
government and other actors. Over 200 trainees have exited the centre and are gainfully
engaged.
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 50
1.9.6. Marigat Community Capacity Support Programme (CCSP Marigat)
The centre is located in Baringo South Sub-County and was initially established for the
purpose of training mothers on basic nutrition skills to address the malnutrition problem that
was prevalent in the area. However, the centre is currently available as a training facility to
the community and other development partners willing to give training at a fee. Over 25
trainings have been conducted at the centre with over 400 trainees.
1.9.7. GOK grants to community initiatives
These are Government of Kenya grants given to groups as a form of compliment/recognition
for the efforts made by the groups. The groups are then used as models for others. The
benefitting groups are identified by the respective District Gender and Social Development
Committees established popularly by the community group members. During the last
financial year 2012/2013, each sub-county disbursed Sh600,000, bringing the total for the
county to Sh3,600,000. The county government can replicate this.
1.9.8. Older Persons Cash Transfer (OPCT)
This is a national programme that is run in all the constituencies in Kenya. Currently, there
are 170 beneficiaries in each of the sub-counties -- Koibatek, Mogotio, Baringo North and
Baringo East in phase iii. Baringo Central has 732 beneficiaries from phase ii, Marigat has
only 18 beneficiaries, being a replacement from those exiting in Baringo Central. This is
because Marigat had not been declared a constituency of its own by the time of phase iii.
During the next financial, year the national government intends to double the number of
beneficiaries. However, considering the number of eligible applicants per ward is 500, it‘s
important that the county government seeks ways of complimenting the national
government by establishing a county OPCT programme. The current total OPCT grant in
the county as at 2012/2013 financial year is 1,442 beneficiaries x Sh2,000 monthly x 12
months=Sh34,608,000.
1.9.9. People With Severe Disability (PWSD) cash transfer
This is also a national programme operating just like the elderly persons cash transfer above
except that it handles/serves people with severe disability. Currently, each of the sub-
counties apart from Marigat receives 70 beneficiaries Sh2,000x 12 months x 5 sub-counties
bringing the total grant/stipend payment in the county Sh8,400,000. Marigat shares the 70
slots with Baringo Central –Marigat 38 and Baringo Central 32. The county government can
consider establishing PWSD cash transfer programme.
1.9.10. National Fund for the Disabled of Kenya/ National Council for People
with Disability (NFDK/NCPWD)
The two are private and semi-government bodies assisting people with disability with
assistive devices and grants. Assistive devices include wheel chairs, white canes, crutches,
tailoring machines, carpentry and welding tool kits to assist PWDs with movement and
livelihoods. During the last financial year, the NFDK provided 46 pieces of different
COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 51
assistive devices and Sh200,000 to an institution. The NCPWD provided 106 devices and
Sh1,000,000 to one group. The county government should source for more partners to
enhance this programme so as to cater for the many needy cases.
1.9.11. Women Enterprise Fund (WEF)
This is a national government sponsored programme meant to provide revolving loans to
women groups. The initiative was initiallyrun by the Women Enterprise Fund Secretariat in
Nairobi and using the department of Gender and Social Development and the WEF
volunteers. Up to the last financial year, 2012/2013, more than200 women groups in
Baringo county have benefitted with more than Sh16, 000,000. During the current financial
year, more groups will benefit from the national government pledge of Sh3 billion.
However, the county needs to enhance the utilisation of this facility.
1.10. Crop, livestock and fish production
1.10.1. Main crops produced
Crops grown in the county are: Maize, finger millet, sorghum, beans, cowpeas, green grams,
garden peas, Irish potatoes, sweet potatoes. Beans and maize cover the largest acreage in the
county while Irish potatoes and garden peas cover the lowest acreage. Maize and beans are
mainly grown in the highlands while finger millet and sorghum are grown in the lowlands.
Maize is the leading food and cash crop in Baringo County, but, its production has been low
due to poor rainfall distribution and poor crop husbandry. Coffee has registered a decreasing
trend in production due to high costs of production and erratic market prices. Although
coffee prices have recently been favourable, the production has remained low due to
previous neglect of the coffee bushes by the farmers.
Baringo achieved 309 hectares in 2012 that yielded 17,167 bags of rice worth Sh108 million
and is currently targeting 500 hectares expected to produce 27,000 bags. To improve the
county‘s food security, the county government shall support, promote and partner with
development agencies on programmes integrating in situ rainwater harvesting technologies,
flood recession agriculture and harnessing of streams and rivers to expand irrigation
command land. The county government shall also support development and implementation
of programmes that conserve the environment and catchment areas. It will also support those
that ensure sustainable natural resource use and disaster risk reduction. The county
government shall mobilise resources to support ongoing and new community-managed
livelihood projects.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 52
1.10.2. Acreage under food crops and cash crops
Baringo achieved 309 hectares in 2012 that yielded 17,167 bags of rice worth Kshs.
108 million and is currently targeting 500 hectares expected to produce 27,000 bags.
The table below shows the agricultural output of the county.
2011 2012 2013
CROP Achieve
d area
(HA)
Producti
on
bags/tons
Value
(KES)
Achieve
d area
(HA)
Producti
on bags /
tons
Value
(KES)
Targe
ts
Producti
on
bags/tons
Maize 35,184 609,397 1,615,287,4
96
36,062 746,809 2,233,148,0
00
42,550 950,400
Beans 16,017 100,268 668,679,47
5
16,417 80,186 384,140,00
0
22,510 220,830
Sorghum 860 8,869 23,912,500 1,100 10,341 26,831,000 1,791 25,962
Finger
millet
3,128 28,308 109,084,00
0
3,546 31,300 132,334,00
0
4,239 53,539
Cowpeas 665 1,447 22,609,700 557 2,225 26,364,800 1,004 8,005
Green
grams
383 2,019 23,764,000 563 1,746 15,573,600 885 7,680
Cassava 97 1,000 12,845,000 105 961 10,005,000 117 2,230
Sweet
potatoes
179 855 11,182,000 234 1,448 14,063,000 406 5,053
Coffee 811 2,278 12,280,000 816 1,396 10,420,000 823 1,404
Cotton 955 527 22,338,000 872 634 22,003,000 890 609
Macadam
ia nuts
92 181 10,651,000 152 207 12,430,000 164 272
Groundnu
ts
994 1,902 10,714,000 1,020 3,137 17,818,000 1,285 4,280
Mangoes 181 1,209 13,730,000 201 1,296 18,670,000 187 1,332
Avocadoe
s
63 323 3,196,000 51 325 4,976,000 61 450
Oranges 36 351 5,290,000 35 215 3,540,050 33 197
Lemons 72 216 3,255,544 52 193 3,121,000 46 172
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 53
2011 2012 2013
CROP Achieve
d area
(HA)
Producti
on
bags/tons
Value
(KES)
Achieve
d area
(HA)
Producti
on bags /
tons
Value
(KES)
Targe
ts
Producti
on
bags/tons
Passion
fruits
22 268 8,060,000 28 208 7,400,000 30 214
Paw paws 79 999 12,461,000 75 975 13,910,000 50 895
Bananas 161 1,215 13,950,000 178 2,121 24,230,000 185 2,644
Onions 89 663 17,105,000 60 419 12,660,000 116 769
Water
melons
67 498 4,307,500 67 638 6,810,000 145 1,420
Tomatoes 138 1,237 30,846,250 119 1,039 19,200,000 235 1,560
Kales 171 1,166 10,780,000 167 968 15,870,000 292 1,240
Cabbages 114 880 6480000 92.5 666.5 35490000 184 1840
TOTAL 60,694 764,478 2,672,808,4
65
62,062 888,228 3,071,007,4
50
77,445 1,292,815
Figure 15: Crop Production Estimates for Baringo County
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 54
Figure 16: Income distribution among cash crops
1.10.3. Average farm sizes
The average farm size is 2.5ha. Landholding in the county varies from one sub-county
to another. Whereas landholding in the southern part of the county, that is, Koibatek
Sub-Sounty, averages 2.5ha and demarcated with title deeds, land is still communal
and managed by the community inthe northern part, that is, the East Pokot Sub-
County.
1.10.4. Main storage facilities
Most farmers still use traditional mode of storage, that is, granaries, to store harvests
for subsistence. The county is also served by the National Cereals and Produce Board,
which has four depots in the county that are located in Eldama Ravine, Marigat,
Kimalel and Kabarnet. The stores assist farmers to store surplus produce.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 55
1.11. Livestock population
The livestock production output of the county is summarised below:
Table 11: Livestock production in Baringo County:
Species/
Type
Total 2012 Total 2011 Total 2010
Cattle Dairy 159,383 118,627 95,092
Zebu 372,379 342,589 315,181
Goats Meat 948,642 921,904 850,608
Dairy goats 3,074 2,809 2,345
Crosses 689 633 583
Sheep Hair 304,848 277,411 257,992
Wool 19,556 17,795 16,550
Dorper 24,680 22,458 20,887
Others 56,257 50,293 46,772
Poultry Indigenous 1,018,381 814,704 657,763
Layers 50,420 45432 40889
Broilers 14,800 13,320 11,988
Ducks 2,757 2,919 2,488
Turkeys 1,718 1632 1,550
Geese 814 773 734
Beehives KTBH 12,517 12,144 11,536
Langstroth 2,341 2,270 2,156
Log hives 126,007 122,226 116,115
Donkeys Donkeys 13,660 12,977 12,328
Rabbits Rabbits 4,904 4,659 4,426
Pigs Pigs 137 116 98
Camels Camels 10,189 10,189 9,680
Emerging livestock Ostrich 125 118 112
G/ fowls 0 0 0
Doves 799 759 721
The main livestock in the county include the East African Zebu Cattle in the lowlands and
exotic cattle in the highlands of Baringo Central and Koibatek Sub-Counties. Other activities
include bee keeping and honey production, hides and skins. To improve on income and
livelihood diversification, the county government will support programmes on value addition
in among others honey, meats, fish, hides and skins, poultry, dairy, rabbit and pasture/hay
storage, while prioritising programmes on diversification to emerging livestock, including
ostriches, guinea fowls, doves, crocodiles, camels, snakes and termites.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 56
1.11.1. Contribution of livestock to the economy
Table 12: Proceeds from the sale of live animals (2012)
Species Number Average price
(Kshs)
Total Value
(Kshs)
Cattle 25,269 17,250 435,890,250
Goats 57,757 4,250 245,467,250
Sheep 14,340 2,250 32,265,000
Chicken (local) 246,696 275 67,841,400
Broilers 14,371 340 4,886,140
Culled layers 2,566 250 641,500
Camels 1,738 27,500 47,795,000
Donkeys 135 5,000 675,000
TOTAL 835,461,540
Table 13 shows the proceeds received by Baringo Farmers from the sale of livestock products
in 2012.
Table 13: Proceeds from the sale of livestock products (2012)
Item/unit Quantity (kg) Unit price/kg Total Value (kshs).
Milk 12,891,815 35 451,213,525
Beef 695,380 300 208,614,000
Mutton 196,755 400 78,707,000
Chevon 476,361 400 190,544,400
Camel meat 180 400 72,000
Eggs/Tray 997,670(trays) 240 239,440,800
Crude honey/kg 435,113 200 87,022,600
Wax 225 500 112,500
Hides 21,358 35 747,530
Goat skin 248,087 182.50 45,275,878
Sheep skin 30,893 182.50 5,637,973
Total 1,307,388,206
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 57
Table 14: Projected revenue estimates based on potential production
Item/unit Annual revenue
estimates 2013
Annual revenue
estimates 2014
Annual revenue
estimates 2015
Milk 812,184,345 852,793,550 955,128,755
Beef 208,614,000 369,288,600 546,547,200
Mutton 173,144,400 188,727,200 217,036,400
Chevon 318,209,200 353,212,400 409,726,000
Camel meat 24,000,000 25,200,000 27,972,000
Eggs/Tray 957,763,200 1,206,781,680 1,580,883,840
Crude honey/kg 574,349,200 735,166,800 827,062,800
Wax 22,500,000 27,225,000 34,303,500
Hides 1,248,345 1,323,245 1,482,005
Goat skins 75,610,663 83,927,735 97,356,266
Sheep skin 12,528,806 13,659,943 15,704,855
TOTAL 3,180,152,159 3,857,306,153 4,713,203,621
1.11.2. Number of ranches
There are several group ranches within Baringo County. Those neighbouring urban centres
have been encroached by the expanding towns.
Group Ranch Size
(HA)
Type Current status
Marigat G.R 8757 Group Has 438 members,fully registered and allowed to subdivide
Kimalel G.R 6073 Group Has 655 members, fully registered and allowed to
subdivide
Sabor G.R 8100 Group 651 members fully, registered allowed to subdivide
Kokwa Island 506 Group 116 members, fully registered No subdivision requested
Ngambo G.R 5501 Group 1659 members, not registered
Salabani G.R 7522 Group 857 members, not registered
Eldume G.R 5052 Group 671 members, dispute with Sandai adjudication section
Bakibi ‗A‘ G.R 6443 Group 801 Members, fully registered, no request for subdivision
Barkibi ‗B‘ G.R 6443 Group 250 members, fully registered, subdivision allowed
Bartum Ranch 19,086 Group Not registered group numbers
Ngaratuko Ranch 1,900 Group Not registered due to dispute
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 58
1.11.3. Main fishing activities
There are over 400 fishing households in Lake Baringo and 700 fish farmers with
fishponds in the county. In the recent past, 35 dams have also been stocked with
910,000 fingerlings mainly of the Tilapia and Clarias species. Fishponds in the county
occupy over 184,000 square metres. The main fish species are protopterous (lung
fish), tilapia and clarias. Fish farmers obtain their fingerlings from Omega farm,
Kokwo Island, Lake Baringo or Jewlet Farm, Kendu Bay, Homabay County at a price
of between Sh7 and Sh11. The survival rates are estimated at 90%. The fishing gear
being used by the fishermen are: Fishing nets, hooks, traps, motorboats and canoes.
The total value of fish is approximately Sh11.8 million.
1.11.4. Forestry and agro-forestry
The forest resources in the county are important assets for the provision of basic
needs, conservation and improvement of physical conditions of the county. They
supply essential wood products, employment opportunities, revenue collection base,
control soil erosion and conserve of water catchment areas.
1.11.5. Main forest types and sizes of forests
Baringo County has 65,280.4ha of forests, which are gazetted. The established
plantations cover an area of 13,940ha, while the rest is natural forest. The distribution
of forests within the county is shown in Table 9. Cases of felling of cedar, podo and
osyris lanceolata as well as sandal wood harvesting and charcoal burning are a threat
to the forest cover in the county.
1.4.1 Table Distribution of Forests in the County.
Region Area (Ha) Plantation (Ha) Indigenous
(Ha)
Status
E/Ravine, Torongo,
Mumberes and Esageri
42,315.7 14,300 28,315.7 Gazzetted
Kabartonjo 4397.4 300.3 4016.97 Gazzetted
Tenges 9270.0 104.6 9165.4 Gazzetted
Ol Arable/Muchongoi 2973 50.0 2923.0 Gazzetted
Marigat 1392.8 0 1392.8 Trust land
Total 65,280.4 14,885 54,961.17
Source: Zonal Forest Office - Koibatek /Baringo, 2013
1.11.6. Forest products from gazetted and ungazetted forests
The main forest products in the county are honey, wood, timber, posts, poles and
bamboo for fencing.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 59
1.11.7. Promotion of agro-forestry and green economy
Protection of water catchment area: A number of residents depend on the forests to
earn a living. They keep bees, harvest timber and burn charcoal. These actitivies —
charcoal burning and timber harvesting — contribute to deforestation and destruction
of water catchments. The major water catchment areas are Lembus/Koibatek
(northern Mau catchment) to the south, Tugen Hills, Mochongoi and Ng‘elecha to the
east, Amaya and Tiati Hills to the north east and north respectively. Several attempts
have been made by the forest department to protect them. This is by planting trees
along the rivers and lakes and discouraging human settlement near it.The Water
Resources Management Authority (WRMA) together with the communities is making
an effort to manage and plan for resource use and allocation in the county. They do
this by classifying the catchment areas into various categories as follows:
Lake Baringo catchment (foursub-catchments — Perkerra, Molo, Endao and Ol
Arabel), Lake Bogoria catchment (tow sub-catchments — Waseges and Emsos),
Kerio North (five sub-catchments — Kipsaa, Turukwei, Mbara, Kaptich and Yeptos),
and Lake Kamnarok (Pemwai).
The Tiati catchment (comprising Amaya, Nginyang‘ and Kolowa) is based on
seasonal rivers. In this, they plan to make sub-catchment management plans, which
shall comprise 60 water resource users associations. Six have already been completed.
Prevention of soil erosion: Farmers are encouraged to plough 30m away from rivers.
This is to avoid soil from being swept downstream into the rivers. There is need to
plant more trees and increase soil conservation measures like building gabions and
terracing.
Provision of soil fertility by growing nitrogen-fixing trees: The players in the
environmental, water and housing sub-sector will enhance the growing of nitrogen
fixing agroforestry trees to improve the condition of soils used for farming. These
trees capture nitrogen from the air and deposit in the soil through theroots and falling
leaves. They also pull nutrients to the surface, enabling crops with short roots to
absorb them.
Growing of fruits trees: For domestic use and the surplus sold.Mangoes, avocado
and oranges are grown in the high altitude areas of Timboroa and Kabarnet, while
pawpaw, bananas and watermelons thrive in the lowlands of Mogotio and
Marigat.Their full potential is, however, yet to be exploited. Birrea fruit trees are
grown in some parts of Kerio Valley.
Provision of carbon sinks: Towerpower, a private electricity producer, has been
licensed by National Environmental Management Authority (NEMA) to put up a 1.15
megawatts bio fuel plant in Marigat Sub-County. The bio fuel plant will be fed by
residue such as wheat and sisal waste, and earn carbon credits. It willemitan estimated
50,000 tonnes ofcarbon.Geothermal Development Companyis looking to register and
implement Clean Development Mechanism (CDM) projects for Bogoria-Silale block.
This is bound to spur economic growth in the county.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 60
Beautification activities: These are mainly in urban centres, highways, schools,
homes and other public places. Eldama Ravine and Kabarnet towns have benefited
from beautification programmes from the local government funds.
Animal feeds production: Star grass and remnants from farm produce are processed
for the purpose of producing feeds for livestock. To ensure sufficient livestock feed
during periods of scarcity, and especially during disasters, programmes for
rangeland/pasture improvement will be supported and implemented with community
participation for sustainability. To achieve this, the county government shall mobilise
resources for these programmes and also partner with stakeholders to promote and
support DRR initiatives for pasture reseeding, enclosures, deferred grazing and seed
production. It will also support efforts for land reclamation from the invasive
Prosopis juliflora for pasture production and subsequent conservation/preservation as
standing or baled hay to create fodder banks.
Growing and processing for medicinal purposes/value plants and products:
Baringois rich in medicinal value trees. Several indigenous medicinal trees grow
naturally in forests. Aloe Vera and sandalwood are among the most important
medicinal plants in the county. European Union has invested in constructing an
industry in Baringo Central Sub-County.
1.12. Environment and climate change
1.12.1. Major contributors to environmental degradation
One of the greatest challenges facing the county is environmental degradation,
including deforestation, desertification, pollution and climate change — an issue of
increasing concern for the local, national and international community.Overgrazing,
overstocking, unregulated charcoal burning and cultivation of steep slopes among
other factors degrade the environment. With frequent droughts occurring in the
county, the effects are profound.
Oil pollution garages and petrol stations is another environmental
challenge.Workshops disposing off sawdust and waste timber often burn the sawdust,
producing pungent fumes that polute the air. Raw sewage pollutes water hence
environmental risk, but clinical waste is the most hazardous.
The problem of waste management in the county is a serious one. As mentioned
earlier, none of the urban centres in the county has a sewerage treatment system and
there are no formal garbage disposal sites.
Management of plastic waste: The disposal and management of plastic waste
presents a great challenge to the county, more so to the urban areas. The worst
category of plastic is the carrier bags. They are blown by the wind, littering
everywhere, including wetlands and cause a great eyesore. These bags also often
chock and kill animals. Since disposal by burning releases toxic gases into the
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 61
atmosphere, there is urgent need for both the national and county government to
formulate a policy in the use and management of this special category of waste.
1.12.2. Effects of environmental degradation
Environmental degradation in certain parts of the county is severe. Some parts are
covered with deep gullies, especially in East Pokot, Mogotio, Kerio Valley, Arabal
and lower parts of Koibatek. Settlement in protected areasand those with fragile
ecosystemshas adverse effects in the long run. It reduces agriculture and livestock
output and consequently household incomes. It is also likely to cause human-wildlife
conflict and wildlife migration, which will have negative effect on tourism promotion
and the county‘s economy. There are inadequate measures in place to curb this.
Effects of the major environmental problems on both health and productivity include:
a. Water pollution and water scarcity: These are not only a health risk, but
they also increase the cost of production, as residents have to spend more to
get clean water. They also result in declining fisheries and aquifer depletion,
leading to irreversible compaction.
b. Solid and hazardous wastes: Uncollected garbage and blocked drains are
health risks. Thet also afferct productivity through the pollution of
groundwater resources.
c. Soil degradation: Depleted soils reduce productivity.
d. Deforestation: Causes flooding in lower zones of Mogotio and East Pokot
sub-counties. This not only results in destruction of property but also causes
health risks. Loss of sustainable logging potential and of erosion prevention,
watershed stability and carbon sequestration provided by forests are among the
productivity impacts of deforestation.
1.12.3. Climate change and its effects
Climate change leads to an increase in the intensity and frequency of weather
extremes, floods, landslides and droughts. The greatest impact of the effects of
climate change is borne by vulnerable segments of communities who lack the
resilienceor capacity to prepare, adapt and rebuild (recover).
Extreme weather events, such as severe flooding, increase the risk of waterborne and
vector-borne diseases, such as malaria and diarrhea.
1.12.4. Climate change mitigation measures and adaptation strategies
Given the effects of environmental degradation and climate change, there is need for
climate change mitigation. Outlined below are measures thatstakeholders can
implement to mitigate effects of climate change.
Community participation in climate change adaptation will be enhanced to curb
environmental degradation. In addition, environmental education and awareness
training in schools and colleges will be promoted. The county government shall
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 62
support volunteer programmes and formationof ward/sub-county-specific thematic
DRRaction groups to implement climate change and other related disaster mitigation
measures.
Another measure is the intra and inter-county collaboration together with various
climate groups and organisations to better understand the causes and impacts of
climate change.
1.13. Mining
1.13.1. Ongoing activities
A few valuable minerals have been discovered in the county. Opal has been mined at
Isanda near Perkera. Fluorite deposits have been cited in the basement and volcanic
rocks of Tiati Hills while carbon dioxide has been extracted from several boreholes in
the southern part of the county. In recent times, quarrying has gained prominence in
the county, especially in Tenges division where building stones, sand and ballast are
being exploited. There are also abandoned ruby mines at Sandai village near Lake
Bogoria.
1.13.2. Mining potential
The county has a potential of ruby, diatomite, manganese and fluoride mining though
the quantity of deposits is yet to be established. Exploration will need to be carried out
so as to establish the quantity of these mineral deposits. Quarrying is generally done
for building stones, ballast, sand, laterite (murram) and other building and
construction rock material. The proceeds from the sale of minerals in Baringo County
have not been quantified, as the small scale mining activities are not structured.
Tullow Oil Company has set base at the county, Block 12A, to explore oil and if it is
exploited, it will be shared between Baringo and Elgeyo-Marakwet counties.
Government-owned Geothermal Development Company has also started drilling
geothermal energy at Silale area in East Pokot Sub-County.
Baringo County also has carbon dioxide deposits at Esageri, Mogotio Sub-County.
1.14. Tourism
1.14.1. Main tourist attraction, national parks and reserves
The bubbling waters, hot springs, gushing geysers, flamingoes and ostriches are
among the major attractions in Lake Bogoria and Kapedo hot springs. Other wildlife
includes tortoises, large aquatic and terrestrial game. There is also huge potential for
private/community conservancies as well as cultural and agro-eco-tourism tourism.
Baringo County boasts of high class tourist resort centres, among them Lake Bogoria
Spa Resort and Papyrus Inn hotels. Endorois cultural dancersentertain tourists visiting
the lake.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 63
Baringo County shall also diversify the industry and tap into conference tourism
potential by marketing the existing facilities and promoting and encouraging new
investments to complement earnings from other tourist attractions. The county
government shall put in place mechanisms for hotel rating and mobilise resources for
direct investment in suitable facilities while creating favorable climate for private
investment. This will ensure that visitors to the county, including guests of the county
government, are accommodated within the county rather than in neighboring counties
that have superior facilities. Other areas with opportunity for diversification include
education tourism and golf tourism. The county governments will, therefore, support
incentive schemes to enhance educational tourism and actualisation of golfings.
Some forests in Tugen Hills, Laikipia escarpment and Eldama Ravine have beautiful
sceneries that attract regular visitors. Examples are Ol‘Arabel, Tenges, Kipngochoch,
Kabarnet, Katimok and Saimo forests.
Apart from being good catchment areas for birds, wildlife, picnics and eco-tourism,
forests encourage soil conservation through terracing, vegetable growing and
beekeeping.
Lake Baringo has 13 islands and viewpoints that provide magnificent views of the
lake. The largest island is called Ol-kokwe, which in Ilchamus means a meeting place.
The other island is Samatian that is small but with breathtaking views across the
bronze waters of Lake Baringo.
Other interesting tourist locations in the lake are Soi Safari Lodge, Lake Baringo Club
as well as Reptile Park, which is one of the largest reptile parks in the Rift Valley.
Another one is Ruko Wildlife Conservancy that scenic attractions ranging from
wildlife to cultural villages.
Korosoi volcano, which rises 1,449m above sea level, offers an ideal spot for
watching birds such as bat hawks and majestic verreauxs eagle.Kabarnet National
Museum and Kipsaraman Community Museum are located on top of Tugen Hills. The
two museums form unique tourist sites with varied attractions and house traditional
Kalenjin artifacts, which include musical instruments, storage equipments, furniture
and ornamental decorations.At Eldama Ravine, there are the Kursalal falls, a stunning
waterfall within Lembus forests.
1.14.2. Main wildlife
Baringo County has Lake Bogoria National Game Reserve, which is 107km2.The
acacia woodlands in the national game reserve is home to many wild animals, among
them rare kudus, antelopes, zebras, leopards, cheetahs, hyenas, mongoose, monkeys,
baboons and jackals. There are more than two million lesser flamingoes and 350 bird
species, especially along the shores of the Lake Bogoria.
Lake Baringo has 450 bird species such as pale and dark phase gabar goshawk,
paradise flycatcher, African fish eagles, marabou stocks, shikra and white-faced scops
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 64
owl, hemphrick‖s hornbill (along the cliffs),the African darter and occasionally the
African skimmer. Apart from birds, visitors have the opportunity to view crocodiles,
hippopotomus, the imposing Laikipia escarpment as well as the dramatic Tugen Hills.
Lake Baringo Snake Park has snake species such as the black mamba, puff adder,
boomslang and spiting cobra. Other reptiles in the park are monitor lizards,
crocodiles, tortoises and harmless stripes bellied sand snakes.
Table 15: Tourist class hotels/restaurants and bed Capacity
Name of the hotel Bed capacity
Sportsline Hotel, Kabarnet 28
Sinkoro Hotel Ltd, Kabarnet 50
Kabarnet Hotel, Kabarnet 50
Taidy‘s Hotel in Eldama Ravine 64
Chambai Hotel in Eldama Ravine (coming up. 150
Soi Safari Lodge 70
Lake Bogoria Hotel and Spa Resort. 80
Source:K.N.B.S., Baringo County
1.15. Employment and other sources of income
1.15.1. Wage earners
The Kenya National and population census statistics of 2009 show that the total
number of people who are in employment in Baringo County are 190,349 against a
population of 555,561 people. Out of the total workforce, 106,126 are male and
83,223 are female. The wage earners are expected to increase to a total of 207,651
with 115,772 males and 90,788 females.
1.15.2. Self employed
Over 58.9% of the labour force is engaged in small scale farming. This means that
most of the workers are busy during land preparation, weeding and harvesting. Those
engaged in their own farms are underemployed during the off-peak seasons. Those
employed are laid off during the off-peak periods.
1.15.3. Labour force
The labour force is generally the population in the age cohort 15-64 years. With this
age cohort, the participation rate of 92% is always assumed. This is because some
people in this age group are either sick or disabled and cannot participate in economic
production. The selection of 15-64 years should not be interpreted rigidly as there are
those above and below this age cohort who are economically active. The number of
people employed in the county is 190,349. Those seeking employment are 30,348
while the economically inactive are 210,822.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 65
Given that pastoralism is predominant in parts of the county, especially in the arid
areas, many of those under 15 years participate in employment as herds‘ boys.
1.15.4. Unemployment levels
Out of the total labour force in the county, only 32 per cent are in employment and the
rest (68 per cent) are unemployed. The major sources of employment are: Agriculture,
rural self-employed, urban self-employed and wage employment. Wage employment
is the main source of employment in the county, generating about 34 per cent of the
total employment.
1.16. Water and sanitation
1.16.1. Water resources and quality
Being an ASAL county, Baringo has prioritised the provision of water for human,
livestock and for irrigation as a necessary requirement for the general development of
the county. Water shortage is prevalent, especially in Lake Baringo and Lake Bogoria,
parts of Kerio Valley, Mogotio, western slopes of Ng‘elecha (Mochongoi) and the
entire East Pokot (Kollowa to Tangulbei). This is caused by the low rainfall received
and cyclic droughts. This has hindere development of livestock and farming
activities, as people spend many hourse daily looking for water.
Water from Lake Baringo has not been exploited for domestic use and irrigation. The
county government shall support efforts to upscale construction of water pans and
dams in order to solve water shortage, especially during dry seasons.The county
gorverment shall promote opartners to drill boreholes to increase accessibility of clean
water in the county. The recently completed construction of Chemususu Dam in
Koibatek Sub-County is one of the long-term strategies in solving water shortage in
the county. However, it urgently requires distribution system for this purpose. Other
water development initiatives to be supported by the county government include
abstraction of water from rivers, spring protections, harvesting of rain water from roof
and other catchments.The county government shall promote and support efforts for
upstream water catchment protection.
Major rivers like Kerio, Waseges, Emsos, Perkerra and Molo together with their
tributaries could tapped for domestic use and irrigation. Other rivers that may be of
importance, though seasonal, are Amaya, Nginyang‘, Mukutani and Arabal.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 66
Table 16: Water sources for different Households in Baringo County
Sub-County Dam Lake Stream
Springs/
Wells
Piped
Into
Dwelling Piped
Jabia/
Rain
Water
Vendor Other
Baringo
Central 513 861 20106 6768 822 5151 118 422 177
Baringo North 291 915 13120 4577 49 367 103 82 230
East Pokot 2246 536 9394 6280 97 59 60 35 2584
Koibatek 4073 32 15094 5276 957 8046 159 656 393
Total 7123 2344 57714 22901 1925 13623 440 1195 3384
Source: Kenya population and Housing Census Report 2009
1.16.2. Water supply schemes
Water supplies are managed by Rift Valley Water Services Board and the community.
The county has scarce water and most of the population relies on water from the
streams. Phase two of Kirandich Dam in Kabarnet needs to be expanded to serve
higher population as it iscurrently underutilised. The water distribution system needs
to be expanded in all parts of the county.
Thecounty government shall promote, support and encourage implementation of
projects geared towards expanding water supply coverage to communities through
own or partnership initiatives. The county government shall mobilise resources
internally and externally to finance such initiatives.
1.16.3. Water sources (distance to the nearest water points)
The sources of water in the county includedams, lake, water pans, streams, wells,
springs and boreholes. They may be piped water or point sources. Water from
vendors, especially in urban centres and small market centres, constitute a small
percentage. The average distance to the nearest water point is 5km. This is way below
the SHERE Standards on access to water. The county government shall institute
measures and policies that will favour improvement of the existing situation.
Therefore, the county government shall initiate programmes for improvement of
water access and also engage with partners to reduce distance to water points to the
acceptable standard of 30 minutes‘ walk. The Bill on Human Rights lists water as one
of the human rights. Policymakers should put in measures to increase accessibility.
1.16.4. Sanitation
Most of the population does not have access to good sanitation. Households using
bushes to relieve themselves constitute 49 per cent while 46 per cent use pit latrines.
Only five per cent of the population has access to proper sanitation.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 67
There is no sewerage plant in all the towns and trading centres in the county. This
poses a major health and pollution hazard among the residents of Baringo. The county
government shall support and partner with relevant development agencies to promote
sensitisation towards increased latrine coverage as well as mobilising resources for
programmes geared towards Community Led Total Sanitation (CLTS) and promotion
of low-cost latrine construction technologies.
1.17. Education and literacy
Investing in education has a significant social rate of return. There is a positive
correlation between education and individual earnings. The better educated an
individual, the more productive he/she is not only in the market but also in the
household. Therefore, investment in education has benefits to the individual and to the
society as a whole.Baringo County experiences low gross enrolments at secondary
school level and the pastoral areas have the highest girl dropout rates.
1.17.1. Pre-school education
Pre-school education has experienced tremendous growth in the county. They are well
distributed in the five sub-counties. The number of ECD centres in Baringo North
Sub-County is 163 with 326 ECD teachers, while Koibatek Sub-County has 191 ECD
centres with 277 ECD teachers. Baringo Central Sub-County and Mogotio Sub-
County have 403 and 250 ECD centres, respectively.
To encourage enrolment, retention and transition at this level as part of DRR strategy,
the county government shall mobilise resources for construction and expansionto
increase capacities and accessofECD centres. It will enhance staffing levels and avail
requisite equipment and materials. Development partners will be encouraged to
partner and commit resources towards this end. This will include partnerships for
ECD feeding programmes, training and remuneration of ECD teachers, as well as
capital investments.
1.17.2. Special Needs Education [SNE]
The county government has put in place a number of mechanisms to ensure a good
education foundation for children with special needs. A number of programmes exist
but there is still need for teachers with specialised training in various categories of
disabilities to be employed.
The following programmes are distributed as follows in the sub-counties:
Baringo Central 3 schools
Baringo North 2 schools
East Pokot 1 schools
Marigat 2 schools
Mogotio 3 schools
Koibatek 2 schools
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 68
Enrolment of Special Needs Education- Pupils 2013
LEVELS BOYS GIRLS TOTAL
ECCDE [Ages 4 – 9 yrs] 48 41 89
Primary [SNE] 380 296 676
Secondary [SNE]
Marigat Mixed Day 4 3 7
Pemwai Secondary - 2 2
Marigat Secondary 6 3 9
Kapkiamo 1 0 1
TOTAL 11 8 19
Vocational Training Rehabilitation N/A N/A N/A
Youth Polytechnics N/A N/A N/A
Staffing Establishment of SNE in the County
LEVELS MALE FEMALE TOTAL
ECCDE 4 8 12
Primary Schools
Kabarnet D/Blind 20 20 40
Esageri School for Deaf 8 6 14
Others - units / integrated 21 30 51
Secondary Schools 1 - 1
TOTAL 54 64 118
The county government in collaboration with NGOs, CBOs, FBOs and corporate
institutions to solicit funds to facilitate infrastructure and resources so as to realise
MDGs and Kenya Vision 2030.
1.17.3. Primary education
The county has 656 primary schools with total enrollment of 143,017 pupils. Since
the introduction of Free Primary Education, remarkable improvement in enrollment
has been observed. The county‘s performance in National Examination has greatly
improved over the years in spite of the unique challenges which the pupils undergo.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 69
However, the retention and transition rates remain a challenge to attainment of DRR
objects. The County Government shall mainstream issues on retrogressive socio-
cultural practices and pre-occupations by mobilizing resources and partnering with
other development agencies to build, equip and staff schools. Resources shall be
committed by the county government and partners for enhance school feeding
programmes and other education incentives. The County government shall also
support integration of ICT in primary education together with partners.
1.17.4. Literacy
The literacy level of a population is one of the indicators of the population‘s potential
for socio-economic development. This is because the literacy enables those who have
received it to consume a wide body of ideas and often acts towards the fulfillment of
some of the aspirations triggered by those ideas. East Pokot has an illiteracy level of
76 per cent the highest in the county. The lowest illetaracy level is 9.1 per cent,
according to National Population and Housing Census, 2009. This gives an average of
28 per cent, which is very low.
The county government shall, together with partners, mobilise resources to support
literacy programmes. This will generally target all community members that lost out
on opportunity for formal education for reasons including FGM, early marriages and
other socio-cultural reasons as well as poor transition and incompletion of formal
education. The specific programmes should establish centres for informal
education,equip and staff them and also establish functional vocation training centres.
To motivate enrolment and retention, the county government and partners shall
provide employment opportunities for those that successfully complete life skill
trainings.
1.17.5. Secondary education
There are 125 secondary schools with a total enrolment of 27,374 students as at 2013.
Among notable challenges facing the sector include harsh climatic conditions,
especially in the lower part of the county; insecurity, which often results in closure of
some schools; poor infrastructure; floods in the low lands; prolonged draught; high
illiteracy rates among parents and retrogressive cultural beliefs. The county
government shall operationalise a bursary scheme for needy students and those
rescued from retrogressive socio-cultural practices and pre-occupations. The county
government, together with partners, shall support establishment of low-cost centres of
academic excellence within each sub-county, complete with boarding and child rescue
centres.
1.17.6. Tertiary education
There are 12 youth polytechnics, one teachers training college, one Kenya Medical
Training College (KMTC), one university campus and three commercial colleges. The
adult literacy classes‘ enrollment stands at 2,506. As part of the wider DRR effort for
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 70
county human capital development, the county government shall support the
establishment and expansion of tertiary education institutions that will benefit the
county residents in acquiring necessary skill for participation in both the local,
national and international labour markets.
1.18. Health Access and Nutrition
1.18.1. Health facilities, personnel
The health sector in the county aims at ensuring that access to basic health service is
guaranteed to the poor. The fee waiver provision and exemption in health centres
ensures that there is equitable access to health care services by the poor. There are 184
health facilities: County hospitals (1), sub-county hospitals (4), dispensaries (156),
health hentres (19), medical clinics (2) and others (2). The doctor-to-population ratio
is 1:57,381 (Baringo Central Sub-County) and 1:34,716 (Koibatek Sub-Sounty). The
infant mortality rateis 63/1000.
The county access to health facilities is poor with most of the population having to
cover long distances, above 5km, to access health facilities. With only four major
hospitals, the available bed spaces are too limited the county‘s entire population. The
county has a low doctor and nurse patient ratios, an indicator of compromised
medicare.The county government shall mobilise resources and partner with other
development agencies to establish and expand community health units. This will
enhance grass root access and referral services to host health facilities. For
sustainability, the created partnerships shall promote income generating activities
within the health facilities to earn revenue, which will be used as stipend for their
attached Community Health Workers (CHWs) among other needs.
1.18.2. Morbidity
Malaria, respiratory tract diseases, skin diseases and pneumonia are the most
prevalent diseases although there has been a marked improvement in diseases control
through effective implementation of various programmes.
1.18.3. Nutritional status
More than one in three children (34.3 per cent) in Baringo County is stunted or too
short for their age compared to 35 per cent nationally. This is a sign of chronic
malnutrition and it is most prevalent in Baringo North and Central, which are usually
more food secure. Prevalence of acute malnutrition for children of age 6-59 months
based on the child‘s weight for height in Marigat and East Pokot sub-counties is
12.2per cent, which is poor.
Child morbidity in East Pokot and Marigat (<59 months old) shows those sick with
watery diarrhea disease is18.9 per cent, bloody diarrhea and fever is 1.7per cent and
33.3 per cent respectively. Air respiratory tract infections are also common in all the
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 71
districts with Baringo North and Central at 65.9 per cent and East Pokot and Marigat
at 42.6 per cent.Key infant feeding practices, iIncluding exclusive breastfeeding
depicts Baringo Central and Marigat at 27.6 per cent and East Pokot and Marigat at
32.1 per cent.Households that normally eat three meals a day stand at 72.1 per cent
and two meals and one meal are 21per cent and 2.6 per cent respectively.
In Baringo Central and Baringo North sub-counties, the prevalence of acute
malnutrition for children under 6-59 months of age based on MUAC shows that,
severe malnutrition (less than 115 mm) is 0.6 per cent while moderate (115-<125
mm) is 3.4 and the malnourished is 4.0 per cent. Immunisation coverage in the two
sub-counties shows average of 97.2 per cent on ages 6-59 months.
The county government shall support and also mobilise partnerships towards nutrition
interventions for children below five years, expectant and lactating mothers. Other
DRR programmes to be supported will include referral services and on-job-trainings
(OJT). The county government shall also support initiatives to ensure quality and 90
per cent coverage of high impact nutrition interventions at health facility and
community level. It shall strengthen their capacity to ensure timely and accurate
reporting of high impact nutrition interventions and improve nutrition outcomes
through integration with WASH and other interventions.
1.18.4. Immunisation coverage
Immunization coverage has improved considerably with current coverage standing at
about 80 per cent. HIV/AIDS pandemic still remains a key challenge although efforts
have been stepped up to reduce the prevalence rate. The HIV pevalence rate is at 4.2
per cent against the national average of 6.2 per cent.
1.18.5. Access to family planning services/contraceptive prevalence
The number of clients to family planning services was 5,768 by 2011. However, the
family planning acceptors were only 47 per cent of those targeted. The percentage of
mothers who were using contraceptives stood at 45 per cent compared to 70 per cent
for the entire nation. The low use of modern family planning methods can be
explained by the fact that initial introduction of family planning targeted only women,
leading to the development of negative attitude of men towards family planning. The
nomadic lifestyle of some communities in the county significantly reduces the uptake
of family planning methods.
The average number of children per family in the county is five compared to the
national figure of 4.6. Injectables and pills as a means of family planning are the
most popular, followed by IUDs and female sterilisation. Few facilities offer
family planning services, especially those that provide male condom, which is a
dual protection against pregnancy and HIV/AIDS
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 72
Chapter Two
County Development Analysis
The chapter provides the linkage of the County Development Profile with the Kenya
Vision 2030, the Medium Term Plans, MDGs and the Constitution of Kenya, 2010. It
also analyses the major development challenges and cross-cutting issues that affect the
development of the county. The chapter concludes with a highlight of the issues, their
causes, the development objectives and strategies mapped to MTEF sectors and county
functions as given in schedule four of the Constitution, 2010.
2.1. National context
This County Integrated Development Plan is a requirement of the County
Governments Act, guided by the national strategic direction articulated in the Vision
2030, which is being implemented through five-year medium term plans. Vision 2030
is Kenya‘s development blue-print covering the period 2008 to 2030. It aims at
making the country a newly industrialised middle-income economy providing high
quality life for all its citizens by the year 2030. The county will coordinate its efforts
within the framework of Vision 2030 to contribute towards achieving an average
annual growth rate of 10 per cent, equitable social development where every citizen
has equal access to opportunities as well as having a result-oriented and accountable
democratic political leadership.
In line with the above, the county will put emphasis on strategies that aim at
improving the welfare of residents of the county through expanding the economic,
social and political opportunities. These strategies will improve on the already tested
best practices to fight poverty through sectors with high potential and wider impact.
2.2. The Second Medium-Term Plan (MTP2):
The Second Medium-Term Plan (MTP2), 2013-2017, is being implemented in a setting
and context, which differs significantly from that of the first MTP. The constitution of
Kenya (2010) has created a devolved structure of government at the national and
county level and specified the distribution of functions between the two levels of
government. The County government will engage the public in policy formulation so as
to seek consensus participation of the people, good governance, integrity, transparency,
accountability and sustainable development. The Public Financial Management Act,
2012, will guide the county in preparing its County Integrated Development Plans.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 73
2.3. Millennium Development Goals (MDGs)
The County Development Profile is also linked to the eight MDGs, which aim at
improving the livelihoods of the vulnerable population. During these periods, the county
will strive to set an enabling environment for maximum contribution towards the
realisation of the MDGs:
MDG 1 - Eradicate extreme poverty and hunger. Reducing poverty from 58 per cent
to 50 per cent through the integration of various sectors in the county. This would lead to
reduction of the proportion of people whose income is less than one dollar a day. The
county also plans to achieve full and productive employment and decent work for all by
the year 2015.
MDG 2 -Achieve universal primary education: Through the free primary education,
the county will increase the literacy rate from 86.4 per cent to 95 per cent by 2015 and all
the children, boys and girls alike, will be able to complete a full course of primary
schooling. The county will also endeavour to improve transition rates from primary to
secondary education as well as to tertiary education.
MDG 3 - Promote gender equality and empower women:By eliminating gender
disparity in all levels of education. This will initiated by establishing girls‘ boarding
schools in each constituency in the county. Government women enterprise fund has
funded 316 groups in the county with a disbursement of about Sh19, 050,000 as per the
end of the year 2012. These figures are expected to rise as more groups borrow from the
kitty. The county will also implement the gender policy to ensure equitable
representation of women in development committees and in employment.
MDG 4 - Reduce child mortality:Through availability of antenatal care and
immunisation at the Kabarnet County level five hospital and sub-county hospitals in
Kabartonjo, Eldama Ravine, Marigat, Chemolingot and Mogotio, the child mortality rate
would be reduced from the current rate of 62/1000 in the county.
MDG 5 - Improve maternal health: Access to universal reproductive health for
mothers before and after birth through free distribution of mosquito nets. Antenatal and
post-natal care services have so far improved in the county. The county has a 31/1000
neonatal mortality rate and 21/1000 post-natal mortality rate. The county will gear
towards halving this figure by 2015.
MDG 6 - Combat HIV and AIDS, malaria and other diseases: Malaria, bronchitis
and pneumonia remain the most prevalent diseases. There has been a marked
improvement in disease control through effective implementation of health programmes
such as distribution of mosquito nets and free anti-malaria drugs. Trachoma is another
emerging disease common within pastoral communities. Immunisation coverage is
currently approximated at 80 per cent. HIV/AIDS pandemic still remains a key challenge
although efforts have been stepped up to reduce the prevalence rate, which stands at 4.6
per cent (2011).
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 74
MDG 7: Ensure environmental sustainability. Over 90 per cent of Baringo County is
Semi-arid and environmental resources play a critical role in supporting livelihoods and
reducing poverty. Charcoal burning, overgrazing, solid waste and destruction of water
catchment areas and wetlands are key environmental problems facing the county. The
main mitigations for environmental degradation are: Improved environmental education,
strong enforcement of legislations, community participation as well as strong institutions
at local level in the county.
MDG 8: Develop a global partnership for development. The county adopts an open,
rule-based, non-discriminatory trading from the entrepreneurs from outside the county.
In cooperation with the private sector, development partners and NGOs, the county
government shall provide access to essential goods and services such as water and
training.
2.4. Constitution of Kenya, 2010
The Constitution of Kenya, 2010, has introduced fundamental changes in the
management of public resources as well as a devolved system of governance consisting
of the National and County Governments. This entails devolving power and resources to
the county level. In this regard, the County Development Profile will provide the basic
socio-economic and infrastructural information on which the county governments will
base its development plans and budgeting. The constitution also requires that
development planning and budgeting must be all inclusive – involve all stakeholders in
the county.
2.5. Vision 2030 flagship projects affecting Baringo County
Vision 2030 is the national blueprint for development in Kenya. It is implemented
through an array of policies and programmes as well as flagship projects that are expected
to embody the transformation anticipated by Vision 2030. Several flagship projects are
expected to be implemented in Kenya, including the following:
i. Chemususu Dam: This is one of the two large dams that are anticipated under the
water sector. Construction of the dam is complete, although the distribution is still
ongoing.
ii. LAPPSET Southern Corridor: Under transport infrastructure, the government
intends to construct a standard gauge railway line from Mombasa to Malaba. The
section of the network passing through Baringo on the southern corridor has already
been constructed.
Baringo is also uniquely placed considering that 100km of the northern corridor under
the LAPPSET project is also expected to pass through the northern Baringo – making
this the only county traversed by both corridors.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 75
iii. Kenya School of Government: Under Vision 2030, the Kenya School of
Governmenthas been established and is expected to transform the public sector. This
institution has campuses in Mombasa, Embu, Nairobi and Kabarnet, which is the
headquarters of Baringo County.
iv. Least cost power development plan: The least cost power development plan has
identified geothermal energy as the least cost source of power. The Geothermal
Development Corporation (GDC) has been establishedfor the further development of
this resource, which is abundant in Baringo County at Arus, Kapsoi, Lake Bogoria,
Silale and Korosi. Active petroleum exploration at blocks 12A and 10BB are also
ongoing within Baringo.
v. Establishment of a livestock disease free zone: Vision 2030 also intends to establish
a disease free zone, of which some parts of Baringo adjacent to Laikipia are included.
vi. Value addition through economic stimulus programme: Several projects have
been implemented under this programme, including Maoi slaughterhouse, Mogotio
Tannery and Kapkuikui honey refinery.
2.6. Regional context
Baringo is positioned at the intersection of the Western Region, the South Rift and
NorthernKenya and serves as the gateway to these regions. It is also the host of the
North Rift tourist information and operations centre.
Baringo is also the focus of various security operations associated with the arid
northern frontier involving Laikipia, Samburu, Turkana, West Pokot and Elgeyo
Marakwet. Baringo is important for peace keeping and cohesion initiatives, drought
management, disaster preparedness and climate change resilience building within the
region.
1. The Kerio Valley Development Authority (KVDA) is a regional development
organisation that coordinates development programmes in Kerio Valley.
2. Baringo occupies the northern flank of the Mau complex and most of its head waters
emanate from this tower. The Chemosusu water project is expected to provide an
inter-basin water transfer to some residents in Nakuru.
3. Kerio River forms the western border of Baringo, locally known as Turukwei basin.
This is an important water source for all the counties that depend on it, including
Turkana, West Pokot and Elgeyo Marakwet. There is a need to coordinate
conservation efforts among the affected counties.
2.7. Comparative advantages of Baringo County
These include natural resouces like distinctive geography, biodiversity,geothermal
energy endowment,water-hydro and irrigation and land.human capital like
talent,institutions,value system.economic advantage like location,population and market
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 76
size,stradding northern and southern corridors and economic activities (livestock
production)
2.8. Major development challenges
Being an ASAL area, majority of the population in the county is pastoralist, although
there are few small-scale farmers. The major challenges to development in the county
are: Poor infrastructure, limited water resources, environmental degradation, poor
marketing system and limited access to financial credit services. In addition, weak
institutional systems, poor information and communication technology,
unemployment, insecurity, retrogressive cultural practices and land tenure system are
also challenges that affect the county. The challenges are elaborated in more detail
below.
2.8.1. Poor infrastructure
The existing road network is inadequate and as a result, institutions like schools,
health facilities, designated trading centres and areas with high potential for
production of raw materials for industries are not well served. There are only 289 km
paved roads in the entire county, which is not sufficient. The highland regions of the
county like Mumberes, Eldama Ravine, Sirwa, Sacho, Tenges, Kabarnet and Torongo
have high potential for the production of maize, beans, milk, pyrethrum, horticultural
produce and mutton but the road network is poor due to the steep terrain. These areas
become impassable during the rainy season hence hindering the transportation of
goods and services to the markets.
In the lowland areas of Mogotio, East Pokot and Marigat, there are very few classified
roads. These areas have high potential in the production of livestock and livestock
products but due to transportation problems, there is limited exploitation of industrial
raw materials such as hides and skins as well as meat processing.
Resources towards construction of tarmac roads in the county and opening of new
roads should be increased so as to ease transportation problems. In addition, dormant
airstrips in the county will need to be rehabilitated for use in tourism and other
activities aimed at fostering development.
2.8.2. Limited water resources
Water-related challenges in the county are not limited to water supply and sanitation
services.
Scarcity: Baringo County is classified among the most water scarce counties in the
country. The county is also plagued by chronic cycles of flooding and drought that are
increasing in frequency and severity.
The situation is exacerbated by negative effects of climate change, as well as high
population growth, significant upland watershed destruction and non-equitable
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 77
distribution of water resources. The government has recently taken steps to protect
upland watersheds.
The most affected are the arid and semi-arid areas especially Marigat, East Pokot,
Mogotio and Baringo North sub-counties, which experience frequent shortages of
water for human and livestock consumption. This is caused by the low rainfall
received and prolonged cyclic droughts. This has hindered development of livestock
and farming activities and a lot of time is wasted looking for water instead of citizens
being engaged in productive activities.
Water from Lake Bogoria and Lake Baringo has not been exploited for domestic and
irrigation purposes due to its high salinity. This also affects the ground water in the
surrounding areas.
Because of the unique terrain in Baringo County and the pattern of settlement in
highland areas, which often are upstream of the reliable perennial sources of water,
the water supply schemes struggle with high energy costs for pumping water. The
lack of distribution systems is also a major challenge in the county.
2.8.3. Environmental degradation
Environmental degradation in the county is caused by overgrazing, indiscriminate
cutting of trees for fuel, non-protection of water catchment areas and poor farming
practices. The topography of the county accelerates soil erosion, as it is hilly in most
places. When it rains, most of the soils are swept into Lake Baringo which
exacerbates the problem of silting in the water storage facilities and the dams.
Most farmers seem to be unaware of the importance of environmental conservation,
and hardly take conservation measures seriously. Some of the land is not adjudicated
and this encourages shifting cultivation, with serious consequences on the
environment. Environmental pollution could also become a problem if not checked.
Measures will be taken to sensitise farmers and other residents on the importance of
conserving the environment.
2.8.4. Poor marketing system and limited access to financial credit services
Market outlets for crops, livestock and livestock products in the county are not well
established. For cash crops, poor marketing is occasioned by the weak cooperative
societies in the county. Lack of ready markets and market information for output,
inadequate storage facilities and transportation problems all work against the
development of agricultural, livestock and industrial sectors. On livestock production,
marketing is hampered by inadequate auction and holding grounds, especially in areas
where livestock farming is a major economic activity.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 78
Marketing of milk is hampered by inadequate collection centres and milk coolers as
well as poor roads. There are only a few financial lending institutions in the county,
with Mogotio, East Pokot and Baringo North sub-counties without commercial banks.
Lack of organised markets, poor marketing skills and poor transport system has
hindered business growth in the county.
2.8.5. Weak institutional systems
The performance of most organizations, especially government departments is
affected by inadequate funds, allocations not based on work plans, insufficient
working facilities like vehicles, weak information systems and inadequate staff.
Monitoring and evaluation activities are not well facilitated in the county, which
hinders proper tracking and impact assessment of projects and programmes.There is
need for fast-tracking of the rollout of the National Integrated Monitoring and
Evaluation System (NIMES) to facilitate this process.
Projects and programmes, especially those under the public sector are affected by the
lengthy procurement procedures as well as delays in release of funds. This leads to
escalation of costs, delays in completion and sometimes accumulation of pending
bills, which discourage contractors.
2.8.6. Information and communication technology
The information and communication technology penetration in the county is quite low
at approximately 45 per cent. As at 2012, the county was yet to be connected to the
national communication fibre-optic cable spearheaded by the directorate of e-
government.
The mobile phone coverage in the county is low. Most schools and institutions are not
covered by any service providers in terms of mobile telephony or internet services.
2.8.7. Unemployment
There is a high level of unemployment in the county, especially among the youth.
There is, therefore, need for sustained efforts to create employment opportunities. The
Vision 2030 has employment creation at the core of the social pillar, especially in
relation to poverty reduction. Efforts are being made to create jobs by attracting
investors particularly in horticultural farming and eco-tourism.
2.8.8. Insecurity
Insecurity is another major impediment to development. The county is prone to
frequent cattle rustling between communities within the county and also with those
from neighbouring counties of Samburu and Turkana. This is caused by cultural and
economic factors. Community conflicts over pasture and watering points are also
common during dry periods. Insecurity has completely paralysed farming activities in
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 79
the affected areas. In addition, most of upcoming market centres and schools located
around the areas prone to attacks do not develop due to desertion.
The major intervention to address insecurity will be strengthening of community
peace committees to conduct peace building initiatives and conflict resolution both
within the county and across the borders. Other measures will include strengthening
community policing, providing additional police reservists, improving the capacity of
anti-stock theft, setting up more police posts and improving communication
infrastructure for rapid response by the security agencies.
2.8.9. Retrogressive cultural practices
These practices include, Female Genital Mutilation (FGM), early marriages,
moranism and cattle rustling. FGM is practiced by some communities and there has
been resistance to change despite concerted efforts by government and other
development partners. Girls undergoing FGM are in most cases married off early thus
denying them an opportunity to attend school.
Moranism is practiced by some communities in Baringo. Under this practice, young
boys are taken for training for some period of time in keeping with the tradition. This
denies them time to attend formal education. Cattle rustling activities are normally
executed by morans thereby linking it to insecurity.
2.8.10. Land tenure system
Land ownership tends to be communal, particularly in the semi-arid parts of the
county. This means that most families do not have title deeds to the land they occupy,
which further means that development of the land is hampered. For example, farmers
with no title deeds cannot use land as collateral to secure loans from financial
institutions. Efforts will be put in place to ensure adjudication of the land so as to
issue title deeds to the owners
2.9. Cross cutting issues
This section represents the cross-cutting issues that might affect development of
county and how to address them. A SWOT analysis has also been done for each of the
cross-cutting issues.
2.9.1. Poverty
The main causes of poverty in the county include inadequate and unreliable rainfall
leading to crop failure and drought, especially in the lowlands of the county; lack of
employment opportunities; inadequate extension services; low prices or lack of
organised markets for agricultural produce; high cost of agricultural inputs; poor
infrastructure, especially the road network due to poor terrain; low transition rates in
both primary and secondary schools, inaccessibility to credit facilities by farmers for
investments in agriculture and low yields from livestock and livestock produce.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 80
There is need to put in place strategies necessary to reduce poverty in the county,
which include: Water harvesting and the development of irrigation projects, improved
access to credit facilities, improvement in the road network, value addition to farm
produce, use of AI services and reduction in cost of farm inputs.
The effect of poverty on agriculture and livestock production is very significant as
farmers are unable to purchase inputs for crops and livestock production. This has
contributed to low productivity, late land cultivation and loss of produce due to poor
crop husbandry, animal disease control and persistence drought. The county has
experienced increased poverty levels over the years. The 2009 Welfare Monitoring
Survey (WMS) estimated that 35 per cent of the population in the county lived below
the food poverty line. The people in the county most affected by poverty are the
pastoralists, small scale farmers, female headed households, people with disabilities,
the landless and children-headed household.
Table 17: SWOT Analysis of Baringo with respect to poverty
Strengths
Ongoing programmes towards addressing poverty
Existence of micro-finance Institutions
Operational youth and women funds
Existence of youth training institutions
Existence and operational poverty eradication fund
Availability of large tracks of land
Existence of some well developed human resources
Weaknesses
High poverty levels
Inadequate resources
Lack of implementation of strategies to address poverty
High illiteracy levels
Limited entrepreneurial skills
Low savings and borrowing culture
Limited employment opportunities
Conflicting land use patterns. Poor infrastructure e.g.
road, electricity and water and poor access to credit
facilities
Opportunities
Donor support through interventions in water and
food security
Guarantees in the Bill of Rights in the Constitution
Ongoing training on entrepreneurship skills in the
existing institutions/colleges
Establishment of cottage industries for processing of
livestock and agricultural products
Threats
Frequent drought
Environmental degradation
Climatic shocks affecting agricultural production
High population growth
HIV and AIDS pandemic
Globalisation and influx of cheap goods that threaten
local industries
2.9.2. Gender Inequality
Majority of the illiterate in the county is the adult population, especially women. This means
the quality of their participation in development activities is lower than that of men. In order
to reverse this trend and create balance in participation of men and women in the
development of the county, emphasis will be put on the education of the girl child. At the
same time, functional adult literacy activities will be stepped up in order to improve the
literacy of women who are the majority in the adult classes. The participation of women in
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 81
the cooperative sector in the county is still poor. In order to increase their
participation,cooperative societies should encourage including certain percentage for women
in the management positions.
At the same time, social services will continue to register women organisations and
encourage them to gain access to credit facilities that can enable them under take activities
that help to reduce poverty.
The county recognises the importance of active participation of women in water development
activities. The water department alongside other water bodies has endeavored to involve
women in the implementation, management, operation, and maintenance of water projects.
In order to create a gender balance in the participation of men and women in business
management, micro-finance institutions will be encouraged to focus attention on training
women on basic business skills and providing them with credit facilities in order to improve
their businesses, which will boost the income levels of widows and female headed
households.
The cultural and traditional practices and barriers have contributed significantly to gender
imbalances in the county. These include gender inequality in ownership of land and livestock,
and control over the use of income, especially in the non-working class of women.
All the stakeholders in the development process will work together to ensure gender
mainstreaming in major projects and programmes as well as addressing gender disparities in
access to education.
The stakeholders in the county will address gender disparity issues by implementing the
national government policy on 30 per cent representation of women in major decision making
organs.
Table 18: SWOT Analysis of Baringo regarding gender inequality
Strengths
Women‘s immense contribution to development,
especially in agricultural sector
Incorporation in development committees
Existence of various women groups
Mainstreaming of women issues in development
activities
Legal frameworks in place to supports equality
Weaknesses
Deep seated cultural values that discriminate against
women;
Unwillingness by women leaders to take lead on
women affairs
Skewed participation in project management
committees
Few active women groups on entrepreneurial activities
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 82
Opportunities
Girls-specific learning institutions coming up
Women development fund
Increased access to financial services
Opportunities as a result of affirmative action
Government 30 per cent policy on women
employment, participation in decision making
The existence of the gender department and several
NGOs dealing with gender issues
Threats
Pastoralists movement across the county, hindering
implementation of women agenda
Poor enforcement of the affirmative action and
constitutional requirement
Retrogressive cultural practices strongly bound to
communities beliefs
Collapse of enterprises
Drug and substance abuse and HIV/AIDS
2.9.3. High population growth rate
The county population projection is based on a growth rate of 2.9 per cent per year. This
rapid population growth will continue to have negative effects in all sectors of development if
not checked. For example, there will be increased demand for infrastructural service such as
telephone and electricity, the demand for clean water will increase and proper sanitation may
continue to worsen. High population growth has also worsened the unemployment problem
as well as encroachment of water catchment areas. There is also pressure on land since it is
static among the variables as the population increases.
This calls for the implementation of the population policy in order to reduce the growth rate
as well as the number of children per woman. Family planning will be promoted through
provision of contraceptives.
Table 19: SWOT analysis of Baringo with respect to population growth
Strength
Family and reproductive health programmes
Willingness of women to adopt new family
planning methods
Availability of affordable contraceptives
Weaknesses
High fertility levels
Unwillingness of men to participate in family
planning services
Opportunities
New policy on population
Good will of the donor community and government
to finance family planning services
Threats
Unfavourable cultural practices that impede family
planning campaigns
High levels of poverty
Pastoralist lifestyle, which makes difficult to reach
all the target groups for sensitisation
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 83
2.9.4. Disaster management
Drought conditions occur frequently in the county causing livestock deaths and loss of farm
produce. This is due to low rainfall pattern. Other major disasters include, floods, natural
resource-based conflicts, animal disease outbreaks, plant diseases in irrigated lands, cattle
rustling, boundary disputes/land disputes, land slides and deforestation. Baringo is also
affected by slow onset disasters such as HIV and AIDS.
To combat the effects of drought, more resources are to be diverted to save lives of both
humans and livestock through the provision of water, relief food, disease control, provision of
human health services and food supplements. A long-term solution to curb this problem is to
improve irrigation in the dry areas. A classical example is the Perkerra irrigation scheme,
which has resulted in improved yields of the farmers in the area, especially production of
horticultural products.
The tourism sector is also affected by drought because this is when a lot of wildlife migration
in search of food and water takes place. At the same time, human-wildlife conflicts and
poaching incidences increase drastically due to competition for water at the few perennial
water sources.
Government offices, including local authorities, are at risk of being gutted by fire because
they lack essential firefighting equipment. In order to avert or minimise occurrence of such
disaster, efforts will be made by the county to capacitate both the government offices and the
public on measures of minimising, handling and controlling disasters.
Table 20: SWOT Analysis of Disaster Management
Strengths
Existence of government departments
and NDMA act
Existence of disaster management
committees
Availability of information channels
such as FM radios and libraries
Availability of assessment reports
Past experiences in disasters and
available training facilities
Sufficient security agencies
Existence of NDMA and DSGs
Closely knit societies and willing
volunteers
Weaknesses
Implementation gap
Lack of capacity on DRR, language barrier
Lack of skills capacity and financial resources
Lack of capacity to integrate DDR, finance, lack of clear policy on
DRR mainstreaming in all sectors
Lack of dissemination of information
Low adoption of technology
Rigidity of the populace
Low literacy levels, cultural beliefs, lack of skilled personnel on
DRR
Communication barrier, nomadic way of life, ignorance and poor
telecommunication infrastructure
Overreliance on donations, poor agricultural practices and
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 84
dependence on livestock
Corruption
Poor coordination, lack of equipment and resources
Opportunities
Funding from NGOs, present clear
legislation
Willing workforce, training opportunities
Use of available manpower Government
staff, military, police etc)
Opportunity to have policy on DRR,
sectoral policies, training of staff.
Local FM, available stakeholders
KNBS , ICT e.g. common data centres
Technology, administrative structures
Good will from donors, available
manpower
Active CBOs, NGOs, FBOs, good will
from donors
Availability of global funding
Threats
Duplication of activities, lack of awareness of populace
Transfers, conflicts, Insufficient funds for training
Corruption, transfers, Expansive area
incompetent of staff, corruption, stakeholders perception
Cultural attachment
Hacking, vandalism, computer virus
Conflict‘; cultural beliefs
Lack of funding, lack of political or stakeholder will, nomadism
Cultural beliefs, mismanagement of funds, lack of co-ordination
Cultural belief, bureaucracy in goverment
Unpredictable climatic conditions, communal land tenure system ,
refugees
Unpredictable climatic conditions
Terrorism
Encroachment, terrorism
Unpredictable climate
Expansive
Corruption, lack of contingency funds
Duplication of efforts
Reactionary culture of stakeholdersv(government and NGOs
Poverty
2.9.5. Environmental and climate change
Environmental degradation is widespread in most parts of the county. Some areas are lined
up with deep gullies and without any vegetation cover, rendering these areas unfit for
development activities and thus reducing the county‘s production potential. Settlement in
fragile ecosystems also affect these areas adversely in the long run, thus reducing agriculture
and livestock output and consequently household incomes. The incidence of human-wildlife
conflict has also increased as well as interference in wildlife migratory routes.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 85
Use of plastic packing has resulted into major heaps of plastic scattered all over the towns or
urban areas, posing a major environmental hazard in the county.
Oil pollution from garages and petrol stations is another environmental challenge. Polution as
a result of burning sawdust and waste timber is another challenge. None of the urban centres
has a sewerage treatment system or formal garbage disposal site.
Effects of climate change include warming, frequent drought, effects on pastoralists and on
bee keeping – destruction of bees, which affects pollination.
Table 21: SWOT Analysis of Environment and Climate change
Strengths
Skills in environmental conservation
Presence of technical officers
Existence of environmental policies and legislation
Existence and operationalisation of the EMCA at the
devolved level
Strong and well trained human resource on
environmental impact assessment and audit in the
private sector
Weaknesses
Non-enforcement of laws and policies put in place
to protect the environment
Lack of adequate resources
Inadequate measures to address climate change
Weak environmental policies
Low staffing at the county levels
Weak governance system on matters related to the
environment
Opportunities
Government and donor support on environmental
issues
Educated generation that understands issues of
environment better
Threats
Global warming, destruction of forests
High poverty levels in the county
Conflicting legislation addressing environment
issues
Frequent droughts
2.9.6. County diversity – Minority groups and regional balance
The county is predominantly occupied by the Tugen while the Pokot occupy a small area.
There are, however, minorities like the Endorois, Turkana,Kikuyu, Nubians and Ilchamus
living around Lake Baringo. This poses a danger of excluding the minorities in decision
making in the county as the majority are likely to always have their say. Incidences of clashes
over pasture, water and cultural practices that do not promote county cohesion are frequent.
Cross sub-county projects have been encouraged such as Tororolokwonin Primary Boarding
School in Baringo North Sub County. Itis funded by Ministry of State for the Development of
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 86
Northern Kenya and other Arid Lands. Peace building by both the Government agencies and
CBOs is ongoing in the county.
Table 22: SWOT Analysis of county diversity - Minority groups and regional balance
Strengths
Common source of livelihood
Enactment of the constitution addresses the rights of the
minorities
CBOs and NGOs addressing minority issues
Abundant resources i.e. L. Baringo and L. Bogoria
Weaknesses
Common clashes over resources
Democratic processes that confirm the
majority‘s say
Weak network among the CBOs
Opportunities
Common investment to enhance their livelihood
Affirmative action to support minorities
Capacity building opportunity among CBOs
Resources if well harnessed can be shared
Constitutional order
Threats
Overflow of conflict to other counties
Non-commitment in act implementation
Non-vetting of CBOs
2.9.7. Youth
The youth form over 50 per cent of the total population of the county. This group is faced
with a higher risk of contracting HIV/AIDS due to peer pressure, negative attitude to upright
morals, high levels of unemployment and drug abuse. Other factors affecting them include
lack of entrepreneur skills, unplanned pregnancies and early initiation to commercial sex as a
source of living in the urban and trading centres.
The Constituency Youth Enterprise Fund and revamping of the youth polytechnics and rural
resources centres has enhanced their participation in the development process. However, lack
of entrepreneur skills and business culture remains a challenge.
Table 23: SWOT Analysis of Youth
Strength
The existence of vibrant youth organisations
Existence of specific departments dealing with youth
affairs
Existence of national youth council leaders
Numerical strength of the youth
Dynamism and creative energy of the youth who are
Weaknesses
Inadequate personnel at the youth department to
facilitate service delivery
Lack of full involvement of youth in leadership
at the grass root level
Poor institutional/legal policy framework on
youth affairs
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 87
likely to support strategies for youth development Inadequate resources, (infrastructure, budget
allocation)
Limited publicity and information on activities
of the youth department
Opportunities
Institutions created by Constitution of Kenya, 2010
Partnership with private sector to promote internship
programme
Tapping the expertise of young Kenyans in Diaspora
General goodwill from the political class on youth
development
Exploiting ICT technology
Threats
Political interference in youth programmes
Negative perceptions about the youth by sections
of the society
High unemployment, HIV/AIDS and drug abuse
Negative influence due to globalisation and influx
of foreign culture
2.9.8. Persons with Disabilities (PWDs
Although disability is not inability, most people with disability in the county are
discriminated against in terms of access to income earning opportunities. The data of people
with disabilities is as follows: Visual impairment - 4,392, hearing – 3,291, speech – 1,354
and physical/selfcare - 5,475, mental - 1523 and other forms of disability - 1085. There is
need for affirmative action on issues of the persons with disabilities. The use of national fund
for the disabled should be streamlined so that it can benefit the PWDs to establish income
generating enterprises.
The constitution gives the PWDs the opportunity to fully participate in development hence an
opportunity to articulate their issues. The national government has also formulated disability
policies and strategies. Therefore, the county will ensure there is compliance with the
national policy. The community needs to also be sensitised to eliminate stigmatisation and to
support the group.
Table 24: SWOT Analysis
Strengths
Existence of strong organisations
dealing with the physically challenged
Constitutional provisions that cater for
the needs of the physically challenged
persons
Weaknesses
Limited resources and trained personnel to address the needs of
people with disabilities
Slow implementation of the constitutional provisions and
ignorance of the acts by the citizens.
Non-compliance to disability facilities in most buildings
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 88
Opportunities
Inclusion in development activities
Government determination to
implement the constitution to the letter.
Constitutional order
Threats
Stigmatisation and discrimination;
Dinial among PWD
Slow implementation of policies and strategies by institutions
2.9.9. HIV and AIDS
HIV and AIDS is a national disaster in the country and Baringo County is no exception. The
disease has had a major socio-economic impact in the county. The county prevalence is at 4.3
per cent compared to the national level of 6.4 per cent. Most of the households in the county
have either been infected or affected by the disaster.
The impact of the scourge has been wide-ranging and includes an increase in dependency
levels, especially vulnerable children (OVCs), rising levels of poverty and food insecurity,
reduction in savings and investments in the economy due to increased expenditure on medical
care, high mortality rates across key sectors, loss in productivity of human capital and social
stigma towards the infected.
The effort to deal with HIV and AIDS in this county will focus on how to manage the
pandemic given that there is no cure; how to contain the spread of HIV, especially among the
youth and how to address the HIVand AIDS stigma. Discouraging multiple sexual partners
(as in polygamy and prostitution),managingthe problem of widows, widowers and orphans
and providing for the affected and the infected as well as ensuring access to antiretroviral
drugs.
The increasing number of OVCs in the county, currently estimated at over 14,000, is a big
challenge.They are in need of special care, including provision of food, housing and medical
care. In addition to the above, there is still the problem of stigmatisation of PLWAS, which
prevents many people from going for voluntary counseling and testing.
To deal with the problem of HIV and AIDS, several initiatives have been put in place,
including prevention of mother to child transmission, provision of antiretroviral drugs,
establishment of functional VCT centres, treatment of STI and STDS, blood safety and
condom distribution among others. There are also community awareness programmes aimed
at de-stigmatisation of PLWAS and behaviour change communication.
Table 25: SWOT Analysis
Strengths
Presence of organised groups to fight the scourge
Community awareness of the effects of the disease
Trained personnel on management of HIV and AIDS
Weaknesses
Harmful cultural practices
The nomadic way of life
Limited resources and personnel
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 89
Operational VCT centres
Many actors involved in HIV and AIDS programme
HIV and AIDS funds availability
Poor targeting by donor agencies
Poor collaboration, especially on resources
application by various organisations
Opportunities
The political good will to fight the disease
Mainstreaming of HIV and AIDS initiatives at all levels
of development
Support from donors and government to community
initiatives
Threats
Lack of the cure of the disease
Cattle rustling displacing the sick
Land ownership issues
Denial and stigma
High poverty levels among the youth thus
engaging in risky behaviour
New strains of HIV
2.9.10. Information communication technology
The county has not fully benefitted from Information Communication Technology (ICT) as
the requisite infrastructure has not been put in place. Majority of the county‘s residents have
not embraced ICT apart from youth closer to urban centres and frequently use cyber cafes.
There is also lack of electricity mostly in rural areas. This has aggravated further the issue of
digital divide between the urban and rural population in the county. However, the increasing
mobile phone penetration has ameliorated the problem because some can access internet
through their mobile phones. Most public offices, learning institutions and health facilities in
the county are yet to be fully connected and, therefore, there is need to ensure that the fibre-
optic cabling reaches the county and all sub-county headquarters. In addition, there are public
information and documentation libraries/centres where the residents can access publications.
Table 26: SWOT analysis:
Strength
Existence of cyber cafes in urban centres
Advanced technology - the mobile telephony
network and fibre optic cable
Penetration of the mobile telephone services
Weaknesses
Poor distribution of electricity, especially in rural
centres
Poor connectivity to the existing cyber cafes
Slow rate of adoption of new technology
Opportunities
Ongoing fibre optic cabling
The ICT-enabled services that enable the youth to
engage in outsourcing services
Threats
Interruption of telephone system and power due to
vandalism/power outage
Negligence to affordable and local available
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 90
Services being provided by the directorate of e-
government and other agencies
technology
The digital divide between the urban and rural areas
Globalisation and influence of foreign culture
2.10. Analysis of issues and causes – Potential strategic policy thrusts
The table below presents a summary of the main development issues and problems affecting
the county, their causes, development objectives and proposed strategies. It also maps the
development issues with the respective MTEF sectors and corresponding county functions.
2.10.1. Agriculture and rural development sector
Institutional Setup:
The national government is in charge of agricultural and veterinary policy while the county
government is in charge of crop and animal husbandry,livestock sale yards, county abattoirs,
plant and animal disease control and fisheries. The National government is expected to
develop a land use master plan
Table 27: Policy thrusts for Agriculture and Rural Development
Problems and their Causes Development objectives Policy Thrusts
Food insecurity
Caused by
Erratic rainfall, low and declining
soil fertility, inadequate farm skills,
high cost of farm inputs,
environmental degradation and
continuous cropping.
To reduce by half the population
suffering from hunger by 2015
To improve Soil fertility and reduce
soil erosion
To reduce dependency on rain fed
agriculture
Promotion of drought tolerant crops,
Promotion of water harvesting
Promotion of sustainable agriculture
and agro forestry
Development of Irrigation Projects
Poor trade and low market value for
agricultural produce
Caused By
Lack of organised marketing groups
Lack of knowledge on value
addition techniques
Promote farmer marketing groups
Initiate market linkages for
agricultural products
Initiate value chain addition for
agricultural crop produce and
provide training to farmers on value
addition
Improve access roads, Construction
of new market stalls
Establish organised marketing
groups for farmers to undertake
produce marketing
Low uptake and adoption of
technology and Low use of farm
inputs
Caused By
Limited budgetary allocation and
few front line extension staff
Lack of funds to purchase of farm
inputs,
Lack of stockists in some areas of
the county.
Inadequate extension service
providers
High poverty levels
Encourage and promote private
extension service provision
Provision of credit facilities and
grants to farmer groups
Increased extension coverage
Group approach extension Increase
farmers‘ access to credit
Encourage investment of agro-input
stores in the county
Encourage bulk input procurement
by farmers‘ groups
Initiate market linkages for
agricultural input and improve
access to the agro-inputs
Encourage farmers to take credit
facilities from banks, SACCOs
Initiate table banking among the
farmer groups
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 91
Problems and their Causes Development objectives Policy Thrusts
Encourage farmers‘ to join groups
and societies to procure inputs in
bulk
Initiate agro-input enterprise
training programme for stockiest
Undeveloped Information
management system (IMS)
Caused By
Lack of equipment and information
sourcing.
To improve agricultural productivity
To develop an IMS policy to guide
the adoption of appropriate
technology by 2017
Develop an affective agriculture
information system to improve
agriculture production, processing
and trade
Review policies on agricultural IMS
with reference to information
sourcing, storage, disbursement and
use.
Improve link between research-
extension and farmer for better
technologydevelopment, transfer
and adoption.
2.10.2. Health Sector
Institutional Setup
National government will devolve funds and management of health care to the
communitiesThe national government to deal with policy and research issuesShifting the bias
of the national health bill from curative to preventive care. The county government health
services include county health facilities and pharmacies, ambulance services, promotion of
primary health care, licensing and control of undertakings that sell food to the public,
veterinary services (excluding regulation of the profession),waste disposal and cemeteries
Table 28: Policy Thrusts for the Health Sector
Problems and their
Causes
Development objectives
Policy Thrusts
Poor health care
Lack of funds
Old/worn-out
structures
Caused By
Inadequate staff
Poor road network
Inadequate essential
drugs
To improve health standards in the county
Ensure that facilities have adequate staff
To curb the spread of the most common
diseases in the county
Ensure the continuous supply of most
essential drugs
Request for more staff from ministry
headquarters
Increase malaria/TB campaigns
Promote nutrition and balanced diet
care
Increase prevention and disease
control
Promote immunisation campaigns
Equip health facilities
Inadequate health
facilities
Caused By,Lack of
funds Old/worn-out
structures
Complete refurbishment and four wards
in Baringo County Hospital
Building of 72-bed inpatient wing at
Marigat Sub-County Hospital.
Solicit for development funding from
GOK, CDF and any other donors
Continuous maintenance of buildings
and stations.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 92
2.10.3. Environmental Protection, Water and Housing Sector
Institutional Setup
The National Government will expand and rehabilitate irrigation schemes i.e. Perkera and
Kerio ValleyThe water catchment Management Initiative, Securing the Wildlife Corridors
and Migratory Route Initiative, Solid Waste Management System Initiative, Plastic Bags
Initiative, Land cover and Land Use Initiative, Housing Development Initiative and
Enactment of the Housing Bill 2006.
The county will control air pollution, noisepollution, other public nuisances and outdoor
advertising. It will also ensure environmental conservation, soil and water conservation,
forestry,firefighting services and disaster management, storm water management systems and
water and sanitation
Table 29: Policy thrusts for Environment, Water, Land and Housing
Problems and their Causes Development
objectives Policy Thrusts
Environmental degradation
Deforestation and Soil erosion
Caused By
High levels of deforestation
Poor quarrying techniques
Poor farming methods
High number of animals
Poor solid waste disposal
Low investments in housing sector
To Ensure that our
environment is well
conserved
To ensure environment
issues are mainstreamed
in planning
Environmental management and Conservation
Increase reforestation
Protection of water catchments
Proper waste disposal.
Water scarcity
Caused By
To ensure sufficient
access to clean and
portable water
Undertake forestation and re-aforestation
Construct more boreholes, construct more
Poor curative
services
To acquire medical equipments e.g. X-ray
facilities, ultrasound, delivery beds,
delivery sets and hand microscopes
(light).
Supply of 20 delivery beds to 20 rural
health facilities
Supply of 5 delivery sets to every health
facility in the County
Supply of 20 light microscopes to the
county
Commit substantial funds to install
new X-ray machines at Kabartonjo
H/C, Tenges H/C, Mochongoi H/C,
Supply and installation of an ultra-
sound machine at Baringo County
Hospital.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 93
Inadequate rains
Inadequate water points
Poor water harvesting methods
dams, construct more roof catchment
And rehabilitate existing water supplies
Initiate riverbank protection along Kerio
Valley
Promote river dam construction
Initiate roof catchments programme
Initiate clean water projects
Poor Waste Management Initiate proper waste disposal and sanitation in
upcoming towns.
2.10.4. Public Administration and International Relations Sector (PAIR)
The national government to provide security to citizens and their property, The county
government shall ensure and coordinate the participation of communities in governance at the
local level and assisting communities to develop the administrative capacity for the effective
exercise of the functions and powers and participation in governance at the local level
Table 30: Policy thrusts for Public Administrtaion and International Relations
2.10.5. Social Protection, Culture and Recreation
The national government to provide consolidated social protection fundThe county
government will be in charge of cultural activities, public entertainment and public amenities,
including betting, casinos and other forms of gambling racing, liquor licensing, cinemas,
video shows, libraries, museum, sports and cultural activities and facilities and county parks,
beaches and recreational facilities.
Table 31: Policy thrusts for Social Protection and Culture
Problems and their Causes Development objectives Policy Thrusts
Increase in the number of
OVCcaused by HIV and AIDS
prevalence;
High levels of poverty
Nomadic way of life.
To Ensure proper care of OVC
To Improve the situation of OVC
Ensure proper care and
protection;
Ensure that OVC get access to
education, health care and birth
certificates
Introduce the OVCs cash
transfer (OVC-CT) to families
taking care of OVC
Work towards poverty reduction
with development partners
Increase of awareness to the
general public on the rights of the
child
Problems and their
Causes
Development objectives
Policy Thrusts
Insecurity Inadequate
security officers
Conflict over resources
Cattle rustling
Poor road network
Reduction in the cases of cattle rustling in
the sub- county
Ensure security
Improve security by deployment of security
agents
Improve road network
Community policing
Collaboration with communities to
open access roads
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 94
Problems and their Causes Development objectives Policy Thrusts
Closely monitor the OVC-CTs
expenditure
Iincrease awareness among
parents, youth and the general
public
Responsible parenthood
High povertyHigh levels of
unemployment;
Low agricultural production;
Low livestock production;
Low value addition;
Persistence drought;
Lack of markets for both
livestock and agricultural
produce.
Lack of diversification in
business;
Low technology and innovation;
Low levels of networking;
Poor infrastructure
Increases HIV and AIDS
dependency
Improve the standard of living of
the community;
Ensure high levels of income.
Ensure youth access youth fund.
Increase agricultural products;
Increase livestock produce;
Provide water for irrigation;
Improve infrastructure especially
road network
Mobilize youth and capacity
build them on use of loans;
Use of modern farming methods;
Promote hybrid crosses;
Promote irrigation schemes;
Promote agro industries;
Build micro-industries for value
addition to both livestock and
agricultural produce.
Formation of women groups and
training them on entrepreneurship
Community involvement in
identification and opening of
access roads
Integration of HIV and AIDS
programmes in all development
agendas
2.10.6. Education
The county government will be in charge of pre-primary education, village polytechnics,
homecraft centres and childcare facilities.They will continue funding infrastructural
development and other education initiatives
Table 32: Policy thrusts for Education
Problems and their Causes Development objectives Policy Thrusts
Low literacy levels Low
enrolment, retention and
transition rate
Nomadism
Inadequate education
facilities
High poverty levels
Lack of information
Inadequate personnel
Ensure we have good education and quality
education in the County and also make sure that
the 70 per cent retention rate at national level is
achieved in the county
Ensure that the county has good infrastructure
Ensure adequate personnel.
Increase literacy rate;
Improve performance of KCPE from the current
mean grade of 273 to 280 and KCSE from 5.55
to 6.00
increase school facilities by 20%
Increase personnel by 30%.
Intensified assessment and quality
assurance in schools
Hold awareness meetings and
campaigns in schools targeting all major
stakeholders in the county
Improve school facilities e.g. science
laboratories
Hire part time teachers in schools.
Unemployment Lack of
industries to absorb new
entrants
Unemployed
Acquire funds for cottage industries
Increase awareness on the importance of
Initiate skills, training/workshops and
seminars
Initiate case studies and field /industrial
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 95
2.10.7. Energy, infrastructure and Information Communication and Technology
The county transport, including county roads, street lighting, traffic and parking, public road
transport: and ferriesCounty public works and services, including storm water management
systems in built-up areas water and sanitation services, fire fighting and disaster
managementThe national government to invest in energy and more so in renewable energy
Table 33: Policy Thrusts for Energy, Infrastructure and ICT
2.10.8. General economic, commercial and labour
The county government will be in charge of trade development and regulation, including
markets, trade licences, fair trading practices, local tourism and cooperative societies
Table 34: Policy thrusts for the General Economic, Commercial and Labour Affairs
Poor infrastructure
Low levels of technology
Low electricity connections
Low levels of innovation
cottage/small scale industries. attachments and educational tours
Motivational awards of certificate
Problems and their Causes Development objectives
Policy Thrusts
Poor road infrastructure
Lack of funding, poor terrain,
vastness of the county
Adverse weather (seasonal) i.e.
floods
Repair dilapidated roads, construction of new roads
Mapping of dilapidated roads
Prioritising funding of roads
construction through MTEF
To increase all weather road networks
Routine roads maintenance
Sensitize community on road
drainage.
Low ICT services access
Poor infrastructural
development to support
modern ICT facilities
To link the region to the fibre optic cable network
To construct modern ICT centres
Encourage investors to embrace
modern ICT;
empower people to appreciate and
utilise modern ICT facilities
Inadequate power supply Many
areas not connected to national
power supply grid
To alleviate poverty through employment
generation in satellite rural market centres To
supply all market centres and institutions with
electricity.
Connect priority rural areas to
national grid;
sensitise people on alternative
forms of energy
Problems and their
Causes
Development objectives
Policy Thrusts
Under-development of
tourist sites
Lack of funds poor
infrastructure
To raise awareness to all
stakeholders
To map an attraction inventory of
all tourist attraction sites
Improvement of infrastructure
Capacity building of stakeholders
Lack of industries Lack of
funding
Promotion of value addition Construction of industries to process raw products e.g.
meat, fruits and honey Allocating land, funding,
encouraging investors
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 96
Chapter Three
Development Strategy
This chapter develops the strategy that will be used in meeting the challenges identified
in order to realise the aspirations of the people of Baringo over the first CIDP period. It
looks at both what needs to be done and the means that will be used to attain them.
3.1. What does it mean to be developed?
The classic definition of development or ‗maendeleo‘ in local parlance is infrastructure –
roads, water, schools, hospitals and electricity. This document anticipates a broader
definication to include such sustainability concepts like:
1. Social:Security, employment, better standards of life, freedom, gender and
participation in governance and value systems.
2. Economic: Wealth creation, value capture and the equitable distribution of
wealth.
3. Environmental: Quality of the environment and its preservation for future
generations.
Poverty and unemployment are a recurrent issues in the county. Poverty must be understood
to mean, not the lack of resources, but the inability to utilize these resources in meaningful
ways. The development of the county should start from the utilization of resources already
available: The county cannot depend on resources it does not command to solve the problems
it faces. The county government will carry out a comprehensive assessment of the human,
physical, entrepreneurial resource endowment in and determine how to harness the resources
for the development of the county and the wellbeing of its people.
One of the central assumptions of Vision 2030 is that jobs will be created by higher economic
growth. It is clear that, economic growth, without equitable distribution will not result in
significant change in the circumstances of the people. This document is cogniscant that it is
more difficult to lift people out of poverty by redistributing the wealth of the rich. It is
necessary to create new wealth for the people.
The most straight forward way to create wealth and jobs is through the promotion of
competitive business and the pursuit of higher productivity.True jobs are created by
competitive, profitable firms. There is a close correlation between job security and labour
productivity - employees who create more wealth for their employers tend to be more
employable. Accordingly, regional competitiveness and labour productivity should be put at
the core of the proposed policy. The county government will thus formulate and pursue
policies that promote creation of competitive, profitable firms.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 97
3.2. The wealth creation pattern
Figure 7 below illustrates our prosperous cycle, a potential answer to the vicious cycle that
persists in county at the moment.
Figure 17: A prosperous pattern for wealth creation in Baringo
It starts with the identification ofstrategic economic sectors and executing activities that
can improve production in those sectors. This must be done simultaneously with
activities that result in the acquisition of markets for the products. This must quickly be
followed by activities that improve productivity and repeated many times . Figure 18
highlights the key enablers for Baringo‘s economy
Figure 18: Key Enablers for the Economy of Baringo
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 98
3.3. Importance of adopting a strategic approach
The full potential of Baringo in terms of its people, landscape, natural resources, towns,
villages and rural areas and sustainable patterns of development can best be realised by
adopting a strategic focus to further the growth and development needs of the county.
This is because the available resources are not adequate and there is need for trade-offs.
Baringo needs to identify valuable positions, and commit to their pursuit and preserve the
advantages that come from commanding these positions. The following are some of the
advantageous positions that Baringo County shall pursue:
a) Strategic Specialization and Economic Cluster driven Development
Some sectors such as livestock and tourism are very important for Baringo. To realise the
full benefits for development activities, it is important to ensure the firms in these sectors
work closely through clusters. The County Government of Baringo shall promote the
specialisation of regions in certain economic clusters and control the zoning and
development in those sectors for the realisation of growth and a fair and equitable
distribution of development within the county.
b) Delinking the economy from rainfall patterns
The growth of the economy of the county is strongly correlated to rainfall patterns.
Achieving a position where agricultural production is not determined by rainfall patterns
will provide significant advantage in growing the economy of the county. Water
harvesting, irrigation, value addition, reduction of post-harvest losses are some of the
activities that can help bring this delinking. Because of its strategic location, the county
government shall support farmers to also diversify away from agricultural production
into high value, specialised, capital and knowledge intensive sectors such as agro-
services e.g. warehousing, resilient seed production, farm inputs, marketing and regional
branding to protect against the vagaries of nature.
c) Excellence in Governance, Policy Making and Execution
Many of the problems facing the county can be resolved through the enforcement of
existing policies, especially regarding integrity, governance, land ownership, land use,
and environmental protection. The county government shall investits in the
implementation of its policies and transparency. The county government shall also
develop innovative policies that favourably differentiate the county from other parts of
the country. It is also important that a progressive value system is not just upheld by
public officers but by everyone in the county – including farmers, entrepreneurs and
children.
d) Prudent Expenditure
The county government shall commit to a prudent use of the resources under their
custody. This shall call for excellence in procurement and strong oversight and
monitoring to ensure proper utilisation of funds. In particular, the county and national
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 99
governments will utilise ICT for a cost effective and efficient delivery of its services
according to the ICT framework of this document.
e) Decommodification of county products through differentiation and upgrading of
firms using standards
The county government shall assist local firms and farmers to develop products that do
not compete on price, but rather on the additional unique value propositions that they
bring in the market. This will help increase the wealth generated in the county and
reduce the wastage of the county‘s resources. These firms shall also receive assistance on
compliance to standards to ensure they increase access to the market place and are not
locked out through non-tariff barriers.
f) Linkage through transport and communications
The government shall invest in transport and facilitate investment in communications to
ensure that every part of the county is within four hours of an urban area with a
population of 15,000 people or more. The county government shall also promote direct
transportation linkages with second tier towns (without direct linkage with Baringo) such
as Bungoma, Kitale, Narok and Nyeri to enable access to markets and to attract
investment from them.
g) Strategic human capital development
Baringo will invest its resources wisely for the development of its human capital base.
This will call for an appropriate mix of investments in basic and higher education,
scholarships, investment in technical skills, adult literacy and continuous professional
development and the extension services. In all cases, the investments will be indexed
against the needs in the local marketplace.
h) Proactivity and prevention
Baringo will prioritise preventive and proactive investments over reactive investments to
reduce the human and resource cost. In particular, the government shall invest in prudent
environmental management and investment in creating awareness to minimise risks and
costs associated with disasters.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 100
3.4. Overall objectives
The overall objective of this plan is to attain the development vision of the couty in regard to
the aspirations set out in the Bill of Rights under the constitution of Kenya and with particular
consideration for key issues identified during the consultation phase and review of the plan.
Under the Bill of Rights, the Constitution accords the citizens of Baringo the following social
and economic rights:
Table 35: Economic and Social rights under the Constitution of Kenya
Economic and social rights under the Constitution of Kenya
a) To the highest attainable standard of health, which includes the right to health
care services, including reproductive health care
b) To accessible and adequate housing and to reasonable standards of sanitation
c) To be free from hunger and to have adequate food of acceptable quality
d) To clean and safe water in adequate quantities
e) To social security
f) To education
The overall objectives of the County Integrated Development Plan are:
ii. To promote growth in the county by facilitating economic, social and cultural
development throughout the county with due regard to the role of both urban and rural
areas in the overall strategic development of the county.
iii. To define a strong sub-regional role for Baringo as a counter balance to the other
major urban areas of the North Rift and the Mid-Rift region.
iv. To strengthen and enhance the county‘s urban structure and promote sustainable
vibrant rural communities.
v. To promote the future growth and development needs of the county in a sustainable
manner and to ensure that the benefits of economic growth and prosperity are spread
to all parts of the county.
vi. To improve the quality of life and social well-being of all those living, working and
visiting Baringo by ensuring high quality and sustainable residential, recreational,
travel and working environments.
vii. To improve the economic competitiveness of Baringo and topromote and facilitate the
provision of a sound infrastructurebase throughout the county.
viii. To protect, conserve and manage in a prudent and sustainablemanner the
county‘s outstanding natural, heritage andcultural resources and to seek the
enhancement of these resources where appropriate and feasible.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 101
These objectives are not intended to be an end state but rather a general direction as to how
the county can develop, and they will be constanly reviewed. In moving the overall objectives
forward, it is necessary to define some general development aims, in line with the concept of
sustainable development and attainment of the requirements of the Bill of Rights. The
development aims are identified broadly as social, economic and environmental.
3.5. Social development goals
ii. To improve the quality of life of the people of Baringo by ensuring they have access
to basic needs of food, clothing, health, shelter, clean water, education and household
energy.
iii. To develop, social, cultural and community facilities inappropriate locations
accessible to allmembers of the community, with the long-term effect ofsustaining
and enriching the quality of life of residemts.
iv. To ensure that as far as the available resources permit,every family in the county can
obtain a dwelling of a goodstandard located in an acceptable environment, at a price
or rent that is affordable and in a manner that is in accordancewith the principles of
sustainable development.
v. To develop a system of county values that is conducive for the development of the
county in accordance with Chapter Six of the Constitution of Kenya.
3.6. Economic development goals
1. To provide access to water, land, knowhow and collective organisation necessary to
improve economic production, productivity, access to credit and market access for
agricultural output from Baringo.
2. To provide a framework for attracting and retaining investment in Baringo County
while addressing the problems of brain drain, capital flight and perennial
underinvestment.
3. To position Baringo as an attractive place to start and grow world class companies.
4. To promote balanced and sustainable development of all sections of the Baringo
economyand optimise the contribution of the county‘s natural resources while
ensuring that there is adequate infrastructure.
5. To ensure the county‘s natural resources are managed anddeveloped in a sustainable
manner that will ensure they canbe enjoyed by future generations.
6. To ensure sustainable balance between the development andenvironmental
conservation.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 102
3.7. Environmental goals
1. To ensure the conservation and responsible guardianship of Baringo‘s natural and
built heritage for future generations whilst optimising its potential role in sustaining
local communitiesand the overall socio-economic development of the county.
2. To ensure that the resource that is in Baringo‘s biodiversity and water catchment are
conserved and utilised prudently and sustainablyin a manner that will ensure that the
landscape canbe handed on to future generations without being severely degraded.
3. To improve the quality of the built environment in towns andvillages, so that they
develop as attractive viable options forthe attraction of future growth and
development.
4. To maintain and enhance the quality of those physicalelements such as air, water and
soil, that contributes to theenvironment and ensure that homes, towns, rivers and
villages in Baringo are clean at all times.
3.8. Transport and infrastructure goals
1. To develop a high quality, sustainable and integratedtransportation system embracing
the road, rail, air and water transport sectors, with an emphasis on sustainability and
cost effectiveness.
2. To integrate and develop the transportation assets within thecounty, including the
strategic corridors between the northern and southern corridors (both road and rail)
into any regionalplanning strategy.
3. To develop a high quality telecommunications infrastructurethroughout the county as
one means of realising anddeveloping the social and economic potential, particularly
ofthe smaller towns and rural areas.
4. To ensure that the energy supply and distribution throughout the county is expanded
and upgraded sufficiently to enable the economy, enterprise and other developments
to locate in the county.
5. To optimise the development of appropriate renewable energysources which make use
of the natural resource endowment of Baringo County, including hydropower,
geothermal and bioenergy, in an environmentally acceptable and sustainable manner.
6. To develop an environmentally sustainable water supply andsewerage infrastructure
to facilitate economic and socialdevelopment, particularly of the smaller towns and
ruralareas.
All of these goals that make up the overall objectives anddevelopment goals have a spatial
dimension to them in terms of locationand scale of development. In order to guide and direct
them, a spatial framework has been developed to allow the overall strategy to betranslated
into various detailed development targets.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 103
3.9. Development targets
The following section outlines the development targets for the different sectors. These targets have been derived from the existing national
policies.
Table 36: Some development targets in Baringo County
Sector Indicator Current
status
5-year
target
Description
Human development Poverty rate 58% 40% Reduce the poverty rate to less than 40% or the national average
Illiteracy 62% Increase literacy to greater than 90%
Labour productivity - 250,000 Increase average labour productivity to greater than 250,000 per worker
per year.
Unemployment 38% 25% Reduce the unemployment rate to less than 25%
Mean distance to nearest water
point
5km 2km
Rural water 35% 50%
Urban water 60% 80%
Rural energy Access 4% 20%
Urban energy access 35% 50%
Housing andshelter To facilitate the construction of 20,000 units annually
Education Primary school enrollment 140,011 150,000 Expand primary education by increasing the number of classes/schools.
Primary school retention 77% 93.3% Increase enrolment by 16% within the next 5 years.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 104
Transition to Secondary 66.1% 80% Improve transition rate by building more schools and expanding the
current institutions
Secondary school enrollment 29.16% 34.16% Increase enrolment by 13.14%
by increasing streams and providing infrastructure
Retention 98.6% 99.6% Reduce by 1% by supporting needy students – bursary
Re-admitting girls who leave school because of pregnancy
Discourage retrogressive cultural practices e.g. early marriages and FGM
Secondary school transition to
tertiary
67% 75% Increase enrolment by 80% by rehabilitating existing facilities and adult
classes/establish university
Health Finance and stewardship 100% 100%
Service delivery 17% 60%
Service charter Implementation
Quality of nursing care 20% 100%
Customer satisfaction 70% 85%
Prevention of HIV 38% 70%
Automation(IT) 40% 100%
Commodity Management 30% 100%
HR development 40% 100%
Maternal health 30% 40%
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 105
Child health 57% 84%
Community-based info
systems
24 units 60 units
Agriculture, fisheries and
livestock
Annual milk production 23 million
litres
80 million
litres
Increase milk production to over 80,000 million litres per year
Dairy stock 159,000 Increase breeding stock production to over 10,000 per year
Fodder production
Increase meat production to over 100 tonnes per year
Irrigation acreage 1,580 5,000
Irrigation water
Productivity Increase average dairy yield to over 30 litres per animal per day
Industrial Development Value addition Increase MVA to greater than 30% of gross output
Ensure the utilisation of 50% of the hides and skins produced in the
county
Roads and infrastructure Bituminous road 258km 550km Including 50km urban roads
Gravel roads 1,810km 2,400km
Earth/feeder roads 557 1,200km
Environment
Natural resource data 30% 100% Ensure resource data is 100% upto date
Forest cover 33% 38%
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 106
Gabions 10% 80%
Water catchment protection 30% 60%
Dumpsites 0 6 Ensure dumpsites established and fenced in urban centres
Land and Urbanisation Titled land 2 3 Ensure at least 50% of land is titled
Ensure all urban areas are zoned
Ensure development is being controlled
Ensure all urban areas are served with infrastructure
Ensure all urban areas have adequate water
Ensure all urban areas have adequate waste management facilities
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 107
Chapter Four
County Spatial Planning Framework 4.1. Introduction
This chapter presents a spatial framework for Baringo County, from which the 10-year
spatial plan will be developed as per the requirements of the County Government Act
(section 110(1). The development of the spatial plan should be given immediate priority as it
is the basis of all economic and industrial development in the county. Baringo County will
thus develop these plans immediately after the CIDP is adopted.
Spatial planning is an activity centered on making decisions relating to the location and
distribution of land use activities.It refers to the methods used by the public sector to
influence the distribution of people and activities in spaces of various scales. Discrete
professional disciplines that involve spatial planning include land use, urban
planning,regional planning, transport and environmental planning. Other related areas
are economic and community planning. Spatial planning takes place on local, regional,
national and inter-national levels and often result in the creation of a spatial plan.
Regional/spatial planning gives geographical expression to the economic, social, cultural
and ecological policies of society. It is at the same time a scientific discipline, an
administrative technique and a policy developed as an interdisciplinary and
comprehensive approach directed towards a balanced regional development and the
physical organisation of space according to an overall strategy.
Spatial planning brings together and integrates policies for the development and use of
land with other policies and programmes that influence the nature of places and how they
function.
Spatial planning system/process is mandated to ensure that it:
Conserves and enhances the natural environment through the wise use of natural
resources
Mitigates and adapts to the impacts of climate change
Provides the highest levels of protection for Baringo‘s protected habitats, sites,
species and landscapes
Is based on robust environmental evidence and a thorough understanding of
environmental capacity and the cumulative impacts of development
Delivers substantial benefits for the natural environment and people together.
This should include enhancement of biodiversity and landscape, opportunities to
access and enjoy the natural environment and the provision of multi-functional
green infrastructure.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 108
Spatial planning is about anticipating long-term change (and the pressures and
opportunities that emerge from it) and articulating a logical and flexible development
path for a more sustainable and equitable future. The spatial development framework
and associated urban plans achieve this by establishing guidelines about how Baringo
should grow. These spatial plans guide new investment, give effect to the principles and
priorities of the town‘s development strategies, and identify priority areas for strategic
intervention.
With these countywide and urban plans completed and approved, the focus of the
county‘s planning efforts has shifted to the preparation and design of detailed local area
plans and urban esign frameworks.
4.1.1. Role of spatial planning
1. To create the conditions for an enhanced quality of life.
2. To fulfil the aims of efficiency and democracy through public participation.
3. To meet the challenge of sustainable development.
4.1.2. Objectives of spatial planning
One of the main objectives of spatial planning is to ensure that the utilisation of land
resources is planned and implemented in an organised manner to meet the needs of
present and future generations.
4.1.3. Approach required
Spatial planning requires an integrative and comprehensive planning approach in
order to rationalise the appropriate land use activities.
4.1.4. Rationale for spatial planning
1. Baringo‘s urban environment is decaying at a rapid pace hence the need to
establish a county planning framework to accommodate new development and
growth of existing development nodes.
2. To promote and foster development along the principles of the five Ssi.e. Synergy,
Sustainability, Sensibility, Strategic and Supportive.
3. To ensure sustainable utilisation of county land resources.
4.2. The Baringo Spatial Planning framework
Baringo County is constantly changing and growing. To ensure that the county remains a
quality place to live work and invest, as well as to visit, it needs a plan to guide this
future growth and change in the best possible way. This plan is known as the Baringo
County Spatial Development Framework (BCSDF).
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 109
The plans and policies of the BCSDF:
1. Align the county‘s spatial development goals, strategies and policies with those
of the national spheres of government;
2. Indicate areas best suited to urban development, the areas that should be
protected, and the areas where development may occur if it is sensitively
managed;
3. Indicate the desired phasing/zoning of urban development;
4. Guide changes in land-use rights;
5. Help spatially guide, coordinate, prioritise and align public investment
infrastructure and social facilities in the county‘s five-year integrated
development plan.
The SDF does not give or take away zoning rights. The BCSDF will be reviewed and
updated at least every 10 years and the integrated development plan will be reviewed every
year.
4.3. Urbanisation in Baringo County
According to the 2009 Population and Housing Census, Baringo County has over 50
planned centres, three of which qualify as urban areas on population basis. The three
urban areas are Kabarnet, Eldama Ravine and Marigat.
Urban Areas and Cities Act No 13 of 2011 provides for modalities of classifying urban
areas into either cities, municipalities and towns. Some of the centres do not qualify for
any status, particularly like Marigat, which is just at the edge of becoming a town because
of its population. It is for this reason that Sections 8(2) and 10 are to be explored so as to
streamline classification, governance and management of urban areas in the county.
Kabarnet shall, however, play her central role as the county headquarters while Marigat,
Eldama Ravine, Mogotio and Chemolingot shall serve as sub-county headquarters. The
headquarters of the sub-counties and wards shall play the role of cascading development
to the lower levels. Urban areas and trading centres shall continue to play a central role in
commerce and industry, hence planning and implementation of plans is vital. Focus shall
be given to the county, sub-county headquarters and major centres.
4.4. The service centre policy
The number and level of towns are defined by population, the level of social and physical
infrastructure and industrial establishment/developments. Human settlements
aredesignated service and growth centres to improve the quality of life in rural areas and
to complement and stimulate integrated rural development alongside the major growth
centres (Nairobi and Mombasa).
The national government shall define a service centre policy, which will help in guiding
development of different categories of service centres in order of importance. The
classification below is intended to provide a guideline for this activity, designated urban
centres, rural centres, market centres, and local centres.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 110
The functional description of each type of planned human settlement is given as below:
4.4.1. Designated local centres
These centres shall offer the lowest level of service and are intended to serve the
needs of the people within a walking distance. They are designated to serve a
catchment area of up to 5,000 people.
Each such centre shall have a full primary school, several shops, a dispensary, a
public water supply and an open air market. The county corporate communications
team shall maintain a public, official notice board through which information is
disseminated to foster public participation in government activities at all levels. The
centres should be served by a minor road.
Examples of centres that are designated as local centresinclude Koriema, Ossen,
Kiboino, Maoi and Kampi ya Samaki among others. Although most of the centres in
this category have been planned, the plans have not been approved. The plans can,
however, still be used to guide development.
4.4.2. Designated market centres
These centres shall have a residential population of up to 2,000 but are designated to
serve up to 15,000 people in the hinter land.They shall have a primary school, a day
secondary school and a health centre. They shall also be served with a public water
supply, electricity, public transportation, postal (courier) services, mobile money
facilities, a police post and a local bus station (with an airstrip in the remote areas) as
well as other social, commercial and administrative facilities.
Some of the urban areas designated as market centres include: Kabartojo, Mogotio,
Barwessa and Loboi among others.
4.4.3. Designated rural centre
The centresare intended to serve up to 40,000 people and expected to have a
residential population of between 2,000 to 10,000 inhabitants. They are important for
the development of the rural economy and provision of standard amenities.
These centres should have a senior high school, a health centre with maternity facility,
shopping facilities and big markets. These centres should be given priority during the
development of secondary and minimum roads. They should have a piped water
supply, electricity and a sewage disposal system, telephone services, full postal
facilities and banking facilities.
These centres should be served with basic infrastructure to enable them fulfil their
roles as service centres for the rural economy and to encourage the development of
rural industries.
In Baringo, these centres-- Chemolingot, Kolowa and Loruk -- have been planned
though none of the plans have been approved. They still lack the industries and
sewage systems that had been envisaged. The roads connecting all these towns are
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 111
under construction. These centres, however, have the necessary minimum social and
physical infrastructure.
4.4.4. Designated urban centres
This is the highest category of planned service centres. The urban towns within this
category are expected to provide services to a residential population with a population
of over 5,000. These services include a treated water supply, piped sewage system and
disposal plant. These towns should also be serviced with additional infrastructure such
as internal and external roads.The catchment population ranges between 100,000 to
150,000 people.
Thesetownsshall have a fully-equipped hospital, secondary schools, technical colleges
and other higher levels institutions. These centres shall be designed to be focal points
of commercial, industrial, administrative and social services. They are to serve the
present and future needs of the population and the national economy. They shall also
serve as reception centres for rural populations seeking employment and social
benefits.
It should be noted that the county government departments responsible for the
location of physical infrastructure as well as private developers shall ensure that the
facilities are developed strictly as planned.
Kabarnet and Eldama Ravine towns fall within this highest category of planned
service centres. Eldama Ravine has grown from the small centre of less than 2,000
people in the 1970s to approximately 45,000people while Kabarnet has grown from a
small centre of around 2,000 people in the 1970s to around 27,000 people (as per the
population census of 2009). These towns are well served with social infrastructure –
schools, colleges, university colleges, referral and county health facilities although the
enforcement of the spatial plan is weak.
The development of productive activities in the rural areas near these towns shall
continue to provide employment opportunities to people in the towns.
The towns have local physical development plans, which act as a framework to guide
development.
Despite the designation and the consequent preparation of local physical development
plans for these centres, many challenges have hindered the realisation of their
importance. These include:
1. Rapid urbanization: Unplanned human settlement caused by lack of
implementation of prepared plans, urban sprawl and development of
unplanned settlements.
2. High population growth rate versus low economic growth rate leading
to high unemployment rates and poverty in urban areas.
3. Minimal or no community participation in the planning process.
4. Inadequate awareness in planning legislation
5. Inadequate and expensive planning information.
6. Low capacity for plan implementation in the authorities that execute
the plans.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 112
7. Inadequate financing of the planning process and facilitation of the
offices.
8. Inadequate planning equipment and outdated planning technology.
Due to rapid urbaniaation, most of the urban centres in Baringo have outgrown their
current designation. The county government shall reclassify all the urban centres
within the county during the preparation of the spatial plan.
4.5. Connectivity between the service centres
The important transport corridors affecting Baringo are the Nakuru-Marigat-Sudan
Road, Marigat-Kabarnet Road and the Eldama Ravine-Timboroa, all connecting to the
transnational highway (Eldoret-Nakuru Road). Samburu County also connects to the
Southern Corridor and Western Kenya through Baringo County.The towns and the
county as a whole is connected to other parts of the country, for example Elgeyo
Marakwet, Nakuru, Laikipia, Turkana, Nyahururu,Marakwet and the rest of Rift
Valley region although many of these roads are in urgent need of repair. The
connections to the north and east also need additional investment.
4.6. Physical development plans
Table 21 shows the different physical development plans that have been developed for
service centres in Baringo. It is of grave concern that many of these plans are either not
approved or out of date. The county government shall ensure that all these development plans
are approved and up to date.
Table 21: List of development plans for Baringo County
No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS
1. Amaya Not approved
2. Barwessa ,, Revised plan
3. Barsemoi ,,
4. Bekibon Not planned
5. Chemolingot Planned Awaiting approval
7. Cheplambus Not approved
8. Churo ,,
9. Eldama Ravine ‗
10. Emining ‗
11. Esageri ‗
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 113
No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS
12. Kabartonjo ,,
13. Kabarnet Approved on 25/2/1981 Needs revision
14. Kabel Not planned
15. Kaptimbor Not approved
16. Kapsoo ,,
17. Kator ,,
15. Kapchemuso Approved on 15/8/1986
16. Kapchepkor Not approved
16. Kasisit ,,
17. Keturwo ,,
18. Koriema ,,
19. Kiserian ,,
20. Kibingor ,,
21. Kiptagich Approved on 10/8/1990
22. Kapluk Approved on 1/4/1981
23. Kampi ya Samaki Approved on 22/3/1971 Revised
,, Approved on 13/8/1990 Revised
,, Not approved Needs revision
24. Kimalel ,,
25. Kimose ―
26. Kisanana ―
27. Kolowa Advertised Awaiting approval
28. Lelian Not approved
29. Loruk ― Under revision (Ongoing)
30. Loboi Not approved Revised
31. Loropil ,,
31. Maji Mazuri ―
32. Marigat Approved on 26/6/1985 Revised
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 114
No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS
Marigat Awaiting approval
33. Maron Not approved
34. Marigut ,,
35. Maoi Approved on 22/1/1998
36. Mochongoi Not approved Revised
37. Mogotio ―
38. Mukutani ,,
39. Muserechi ―
40. Olkokwe Island ,,
41. Ochii ,,
42. Oinobmoi ,,
43. Seretunin Approved on 3/3/1982
44. Nginyang Not approved Needs revision
45. Ng‘ambo Approved on 4/10/1982
46. Noiwet -
47. Poror -
48 Radat -
49 Saos -
50 Salawa Approved on 30/3/1986
51 Tangulbei Not approved
52 Talai Approved on 29/9/1982
53 Tenges Approved on16/10/1990 Needs revision
54 Timboiywo Not approved
55 Nginyach Not approved
56 Timboroa ―
57 Torongo ―
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 115
Other towns/centres that have not been included but which will need to be planned
include the following: Emsos, Oldebes, Olkokwe, Mugurin, Ngendalel, Pombo,
Kapnosgei, Kabiemit, Mukuyuni, Kipkitur, Waseges,cheberen,sirwa,kimngorom,
Kibotany, Mototon, Kipnyuguny, Kabirgei, Kipteweret, Poror, Kewangoi, Metipsoo,
Kamasaba, Akorian, Kipcherere, Koroto, Sibilo, Yatia, Ng‘aratuko, Tipingar, Kabaraina,
Moinonin, Ilngarua, Ossen, Kaptun, Kiling‘ot, Sogom, Sumeiyon, Kapkirwok,
Kapkiamo, Kasaka, Kokwototo, Komolion, Orokwo, Kiboino, Kapkokwon, Orokwo,
Kiboino, Kipsoit, Pemwai, Magonai, Akwichatis, Riongo, Cheptuwoyo, Nakoko, Natan,
Nasorot, Ameyan, Napukut, Naudo, Silale Crater Village and Ng‘olong‘.
4.7. Model physical development plan – a case of Marigat Town
The physical plan for Marigat is up to date and awaiting final approval. This section
highlights some of the elements in that plan as a model of what is expected of all the other
plans. The key land uses that are important in the planning process are identified. The
plan also specifies the development standards and strategies that need to be enforced for
the realiation of the objectives of the plan. A summary of this is presented below:
4.7.1. Residential land use (Zone 0)
The plan proposes three categories of residential areas. These are high-density residential
areas (HDR), medium density residential areas (MDR) and low-density residential areas
(LDR). The three categories have separate standards and strategies.
Table 37: Residential land use specifications for Marigat Town
HDR MDR LDR
Minimum plot size 0.045ha 0.08ha 0.1 ha
Maximum plot
coverage
75% 40% 30%
Set
back
frontage 3m 6m 9m
Rear 2m 3m 6 m
Sides 1m each 3m each 6m
Housing types Low housing,High rise
developments in
serviced areas
Building types-Bungalows and
massionettes
Single-family dwelling units
Two bed roomed house with a
servants quarters.
Bungalow, massionettes
Building
materials
Floor cement screed cement screed wood strips, blocks, ceramic
tiles, cement screed and parquet
Walls cut stones, bricks bush stones and bricks
Roof GCI sheets tiles and GCI sheets tiles, GCI sheets
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 116
The following standard practices must be enforced in all the residential zones
- Frequent collection of solid waste
- Provision of waste receptacles for households
- Building plans to be prepared by relevant professional experts
- Issuance of compliance and completion certificates by county authority and the
physical planning department
- Regular maintenance of residential roads
- Proper laying of foundations floors
- All building foundations to be inspected by quantity surveyor and architect
- Piped water to be supplied based on the plan and in HDR to supplement using water
kiosks
- Regular inspection to ensure compliance during construction
4.7.2. Industrial- Zone 1
The plan identifies two types of industrial zones i.e. light industrial zone and heavy
industrial zone. The development standards and strategies for light industrial zones
(Zone11, 12) are as follows:
- Minimum plot size of 0.045 ha – 0.08ha
- Plot coverage of 60%
- There should be regular collection of solid waste
On the other hand, the development standards and strategies for heavy industrial zones
(Zone14) are as follows
- Minimum plot size of 0.2 – 0.4 ha
- Plot coverage of 40%
4.7.3. Education- Zone 2
This includes space for schools, colleges and other education institutions.
4.7.4. Recreation-Zone 3
These include open spaces, public parks for public use.
4.7.5. Public purpose -Zone 4
These are land uses planned for the public use such as; cemeteries, polytechnicsetc
4.7.6. Commercial zone - Zone 5
The development standards and strategies for commercial property is as follows:
- Plot coverage of 90%
- Set back: 6m for plots fronting roads between 10-18m and 9m for plots
fronting roads of above 18m
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 117
- Materials: Walls-blocks, bricks, building stones
- Roof: Tiles, GCI sheets
- Floor: Cement screed, terrazzo tiles
- Confine hawking activities within the market
- Realign plot orientation through planning and cadastral survey
- Provision of security lights on commercial premises as a condition for
issuance of single business permit
- Provision of parking lots at an interval of 100m
- Clearly demarcate service lanes
- Old buildings to be given a face lift through painting
- Ensure approval of building plans before construction
- Inspection of buildings to be done before occupation
4.7.7. Public Utility- Zone 6
These include stadiums, dumping sites, sewage disposal sitesand electricity and water
connections.
4.7.8. Transport –Zone 7
These include roads, rail, airstrips and waterways.
4.7.9. Urban agriculture - Zone 9
Agriculture is categorised under zone 9 as one of the land uses within an urban
setup.It is a supplementary source of livelihood for many households.
4.8. Housing in Baringo County
Housing is a basic right that should be provided to all. It is also one of the functions that
have been devolved to county governments. Baringo County experiences an acute
shortage of housing and there is an urgent need to mobilise investment into housing to
attract entrepreneurs and investors.
During the public consultation fora, members of the Diaspora requested the county
government to put in place a sites and services scheme, whereby they would be invited to
develop housing on sites that have been properly served with infrastructure.The county
government shall establish sites and services schemes in different parts of the county.
The county government shall fast track the issuance of land title deeds for security of
tenure, which promotes investment in housing.
The county government shall disseminate information on low-cost building technology
and provide training to construction workers. The county government shall further
ensure that local construction contractors obtain accreditation from the national
construction authority.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 118
Because housing is capital intensive, the county government shall encourage the
formation of housing cooperatives (building societies) and provide the training required
for their flourishing.
The county government shall further develop a public-private partnership framework for
investments in the housing sector.
The county government shall ensure there is adequate infrastructure in residential areas,
.including access roads, provision of water, electricity and sewer services.
The county government shall coordinate all slum upgrading projects in the county to
include areas in Bondeni in Eldama Ravine, Bondeni and Kaptimbor in Kabarnet and
some areas in Mogotio. The county government shall further facilitate the regularisation
of slums and informal settlements.
The county government shall support the establishment of social and commercial
infrastructure such as schools, shopping centres and recreation/entertainment facilities to
promote the quality of neighbourhoods.
The county government shall develop physical development plans and enforce
development control standards.
The county government shall track housing demand and publish the information for
investment purposes on an annual basis.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 119
Chapter Five
ICT Framework
5. ICT Framework
This section introduces the ICT framework that will govern the use of ICT in the affairs of
the county government of Baringo.
5.1. Introduction
ICT can play a significant role in the development of the county. Baringo already boasts
of a number of globally-competitive ICT firms and an even larger number of local
startups. The county government will take steps to become paperless. It should also be
possible for any public officer to conduct their work from any county premise within the
county.
The County Government of Baringo will leverage ICT to increase public sector
productivity by enabling the delivery of county government services for the people,
communities and businesses while supporting open engagement to better informed
decisions and improving the operations of government. The county government will use
ICT to deliver better services and improve operations and processes aligned with the
national government policy.
In future, the machinery of county government of Baringo will depend on ICT, which
will transform government business and services to meet people‗s expectations for better
services, and to create a more open government. Research points to the important role
that ICT plays in driving productivity.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 120
Figure 19: Role of ICT in the public sector of Baringo
The county government will deliver its vision and increase productivity by using ICT to
achieve three strategic priorities:
1. To deliver better services
2. To establish an open and transparent government
3. To improve government operations
Strategic actions are proposed to support the implementation of each strategic priority
5.2. Delivering better services
The people of Baringo expect high quality, easy-to-use government services.
Implementing this priority will deliver on this expectation. The County Government of
Baringo will develop the capacity and capability within government to better meet
people‗s needs and deliver improved services. The priority strategic action is to develop
capacity and capability across government to use ICT in order to achieve improved services,
effectiveness and efficiencies. All staff of the county government will be trained to use ICT. In
addition, all county premises will be connected into a county-wide area network to enable all staff
to do their work from anywhere within the county.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 121
Table 38: ICT Activities for building capability
Enabling better services by using ICT to simplify and integrate government services to both
people and business while maintaining necessary security and privacy. The government shall
be proactive in acquiring ICT solutions, which, as far as is practicable, will be locally
developed
Table 39: ICT activities for enabling better services
2.1 Deliver simple and
easy-to-use online
services
Deliver automated online services that allow people to interact with the
government and access specific services.
Build an interactive website to simplify people‗s access to government online
services.
Provide people and business with a logon that allows them to consent to sharing
information so that government can provide better, integrated services.
2.2 Deliver personalised
services
Build services to capture, understand, and deliver people‗s preferences when
dealing with government.
2.3 Simplify
government
websites
Have only one website for Baringo County.
Create a common look and feel to all government websites.
2.4 Increase the
automation of
services
Automate processes to improve the interactions between people, business and
government. Upload all government forms to the website for ease of access and
downloading by the public.
Output Activity
1.1 Improve utilisation of
existing technology
capability
Simplify and make consistent business processes for common
activities across government to enable improved and standardised
approaches to service delivery and ICT capability
1.2 Technology and policy
integration and delivery
Build the consideration of ICT capability into policy development and
implementation to ensure policy decisions are delivered in the most
effective and timely way and opportunity costs are recognised.
1.3 Improve government
programme delivery
capability
Build capability across county government and its partners to manage
and deliver ICT-enabled programmes and projects.
1.4 Develop ICT workforce
skills and utilisation
Build on existing ICT workforce planning approaches to make better
use of the ICT skilled workforce across Baringo.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 122
5.3. Open government
The Constitution of Kenya requires that the county governments are run openly and
transparently. The Government of Baringo County will promote the implementation of
transparency and accountability in its operations by using ICT in the strategic actions
below.
Creating and sharing knowledge: To share and manage information and knowledge to
improve decision-making and drive economic growth. The county government will set
up an interactive website for public engagement.
To create the proposed knowledge-based environment, the following actions will be
undertaken:
Table 40: ICT for fostering an Open Government
3.1 Build business
intelligence needs within the county government to improve targeting and delivery of
services.
3.2 Use location-based
information
-of-government direction for the use of
location-based information across agencies.
3.3 Develop tools and
platforms to analyse data analyse customer information so that trends can be identified and used to
better inform policy development.
3.4 Release public sector
information share information and knowledge and unlock economic and social value.
To ensure that appropriate data is transparent and shared rather than
duplicated, the government will implement engagement processes for open
data standards activity and crowd-source priority areas for data standards.
Collaboration: This is by building partnerships with citizens and other stakeholders
to improve the effectiveness of government consultations and service delivery.
The following actions will be undertaken to improve the effectiveness of County
government collaboration:
Table 41: Using ICT for Strengtherning Collaboration
Strengthen external
collaboration networks to improve policy development and service delivery.
community
engagement.
4.2 Build collaboration
capability across
government sector
Create online communities of expertise based around common business
processes to develop and share standardised approaches.
4.3 Build the channels
needed for government to
collaborate
Explore partnerships with industry, academics, the community and third
sector, and with agents and brokers to inform policy and deliver services.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 123
5.4. Improve county government operations
Continuing fiscal constraint will require the county government to make the most
effective use of existing and new ICT investments. This encourages greater innovation in
government operations to enable cost effective solutions. The actions below will enable
achievement of these strategic measures to improve government operations.
Investing optimally: This will enable effective implementation of policy by targeting
ICT investments that deliver the greatest value.
The actions to achieve the objectives of the proposed investment programme are set out
below.
Table 42: Using ICT for Improving Government Operations
5.2 Better Investment
governance and information
Increase the visibility of ICT activities, investments and plans to
reduce duplication and deliver effective value for money solutions.
5.2 Portfolio ICT
investment
• Develop a portfolio approach to strategic ICT investments.
Target ICT investments to develop and use whole-of- government
capabilities.
5.3 Use ICT to leverage county
procurement and remove duplication.
Encourage innovation: This will enable the government to harness the full potential of the
digital economy and enhanced technology solutions to deliver serviceseffectively and
efficiently.
To achieve the innovation aims, the actions below will be initiated:
Table 43: Using ICT to encourage Innovation
6.1 Deliver new and better
ICT-enabled services
• Use ICT to make government services available online
6.4 Examine and adopt new
and emerging technologies
• Quickly adopt new ICT models through a risk-based approach
that balances issues of performance, usability, security, privacy
and investment.
6.5 Marketing of ICT products
developed by youth in the county
• Empowering the youth in the county to develop ICT products
and market them to other counties. Examples Bunifu
Technologies and others who are developing software for
schools and supermarkets
5.5. ICT infrastructure
1. The county government shall establish a county-wide information network to
enable the linkage of all urban and rural centres within the county. The sub-county
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 124
headquarters will be linked through optic fibre connectivity, with wireless
accessibility in all towns of the county.
2. The county government shall establish at least one data centre, one business
continuity site and one offsite facility for data backup outside the county.
5.6. Information security risk management
1. The county government shall conduct an information risk management process
and take measures to ensure that security risks are managed appropriately.
2. The county government shall ensure that its data is adequately protected against
breach of privacy.
3. Have an offsite data backup facility for disaster recovery.
4. Sponsoring staff training on various information security courses.
5. Developing county ICT policy.
5.7. Essential ICT systems
The county government shall establish the following information systems
1. CIDP management system:
The county government shall put in place a system for monitoring implementation
of the CIDP. This system shall track on a quarterly basis progress of all projects
implemented under this plan. The county government shall also establish a project
management system accessible to the public. The system shall hold information
on all proposed, ongoing and completed projects and allow members of the public
to propose additional projects.
2. GIS spatial frameworkCIDP sanagement System:
The county government shall implement an access-controlled GIS system that will
bring together all information on development activities in the county within one
system in accordance with the requirements of section 107 of the County
Governments Act.
3. Sector information systems:
The county government shall establish sector information systems (or integrate
into national systems where available) e.g. health information and education
information systems. These systems shall also offer services to the public and
other stakeholders.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 125
Chapter Six
Disaster Management Framework
6.1. Introduction
This chapter discusses the isaster preparedness of Baringo County and proposes a paln for
preparedness.The consultative process for this CIDP established that Baringo suffers from
regular disasters, including drought, floods, landslides, insecurity, famine and other slow
onset disasters such as HIV and AIDs and invasive species. It is necessary for Baringo to put
in place a robust disaster response framework, which is presented in this section.
Baringo County has witnessed repeated loss of socio-economic development gains to
disasters related to drought, floods, landslides, insecurity, invasive species and HIV/AIDS.
These have adversely impacted lives and livelihoods of communities in the county. In order
to create a prosperous and resilient county, there is need to create a framework for
implementation of DRR approaches that will secure development gains or at least enable the
communities to quickly rebound following disasters. This can only be done effectively with
the full participation of communities in participatory disaster risk analysis (PDRA) to foster
ownership and hence sustainability of development initiatives.
In order to achieve the above, the county government shall establish and strengthen structures
for disaster risk management (DRM) by creating institutions and frameworks for their
operations. Also, the county government shall support PDRA activities at the grassroots to
enable the community to identify development opportunities with DRR perspective.
The outputs from the PDRAs will be contingency plans for disaster preparedness and
response, as well as development plans for disaster prevention, mitigation, recovery and
resilience creation. Financing of the PDRA outputs shall be mainstreamed into CIDP. The
county government will also focus on strengthening county/community level systems
(Community organisation) and structures to ensure the functioning of critical facilities at all
times to save lives and livelihoods. Participatory monitoring, evaluation and learning will be
strengthened to improve knowledge management and to strengthen social audit of
development initiatives to consolidate community participation.
Specific action points
1. Establishment of disaster information management and early warning systems
The county government shall establish a disaster information centre and integrated
drought early warning systema at the county headquarters and satellite offices in Mogotio
and Chemolingot. This will host among other departments a geographical information
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 126
systems department, which will develop a geo-portal and geo-database. It will be tasked
with production of dynamic disaster risk maps and text messaging with selected identified
prevention, mitigation and preparedness interventions.
The information centre shall coordinate the gathering, documentation, analysis, storage
and dissemination of DRR information, including early warning of disaster via various
medium. The information centre shall ensure that early warning information is objective
and relevant to inform DRR planning. It shall be linked to the disaster response teams, the
community and other stakeholders for early action.
The information centre shall serve as a repository for baseline reports, contingency and
development plans, response plans, reports and documentations on success stories and
best practices. The aim will be to make it a nerve centre or DRR information.
2. Establishment of county disaster contingency fund
To support early action, the county government shall establish a county disaster
contingency and strengthen the institutional and financing framework for disaster
management. This will provide an emergency fund for rapid access to finances for
response planning, pre-/post-disaster assessments and meetings, as may be required, for
rapid response activities. The fund shall be tailored to be accessible regardless of the
annual fiscal cycle, for timely and effective response.
The output indicators for this action point will be the inclusion of the county emergency
fund in county integrated development plan. The fund willa have clear administrative
structure with objective access criteria linked to the disasterearly warning system.
The county government shall allow and promote flexibility for diversified stakeholder
resource mobilisation for the fund, both internally and externally, in order to rapidly grow
the kitty. The fund administration shall be structured to be headed by the County Disaster
Risk Management Committee (CDRMC) to consist of identified key stakeholders,
spearheaded by the County Government and the National Drought Management
Authority (NDMA).
3. Participatory disaster risk analysis
The county government shall place communities at the centre of all DRR planning by
supporting participatory disaster risk analysis (PDRA) at ward level. The PDRAs shall
establish baselines and map stakeholders, hazards, local and stakeholder resources
capacities, for intervention initiatives in the wards while identifying opportunities for
resilience building. This will be aimed at reduction of disaster vulnerability and enhanced
adaptation to climate change. There shall be effort to support development of ward-
specific plans incorporating DRR perspectives.
Specifically, the county government, together with partners, will fund community
mobilisation, capacity building, participatory planning, project implementation as well as
participatory monitoring and evaluation. The county government shall establish clear
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 127
policy on community entry and exit strategies, as well as reporting, to be adopted by all
stakeholders.
4. Community action planning (Contingency plans, development plans and monitoring
and evaluation framework)
The county government shall, together with other development partners, support
formation of community DRR organisations at Ward level. These will spearhead
community action planning for formulation of contingency and development plans that
are sensitive to commonly occurring ward-specific hazards. The county government shall
secure funds for these activities through internal and external resource mobilisation.
The specific activities to be funded under this will include DRR mainstreaming
workshops, capacity building forums for community DRR resource mobilisation, action
planning, project cycle management and participatory approaches. Other activities
include situation analysis, options assessment and priority setting. The county
government will also fund ward/sub-county/county workshops for stakeholder mapping
and analyses as well as for the development of monitoring and evaluation framework(s)
for DRR initiatives to foster accountability to stakeholders.
5. Partnership and coordination leadership on DRR activities
The county government shall support efforts by the County Disaster Risk Management
Committee (CDRMC) for the identification and mapping of stakeholders involved in
DRR, climate change adaptation (CCA) and social protection programmes. It will also
support coordinated data collection and analysis on food security and disaster
management. To support and promote collaboration and/or financing agreements and
frameworks, the county government shall support establishment of sector-based MOUs
among stakeholders while strengthening county level technical working groups.
The county government shall support timely production and dissemination of early
warning bulletins and publications as well as joint baseline surveys, joint monitoring, peer
review and learning sessions. The CDRMC shall be facilitated to develop an elaborate
implementation and M&E frameworks, communication and feedback mechanism, while
identifying cross-cutting lobby and/or advocacy themes on DRR around which to rally
stakeholders.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 128
Chapter Seven
CountyIntegrated Development Plan,Linkages
with Other Plans.
7.1. Introduction
This chapter discusses at length the CIDP linkages with the Kenya Vision 2030 and
the Constitution of Kenya. A brief status of Millennium Development Goals at the
County level is also provided.
7.2. Integrated development planning
Integrated development planning is defined as a process through which efforts at
national and devolved levels of government and other relevant public institutions are
coordinated at local level, and through which economic, social, environmental, legal
and spatial aspects of development are brought together to produce a plan that meets
the need and targets set for the benefit of local communities.
7.3. Legislation on integrated planning in Kenya
7.3.1. The County Government Act 2012
The County Government Act 2012, in fulfilment of constitutional requirement to
legislate preparation of county plans, details the goals and procedures of County
Planning (Part XI of the Act). County planners are required to prepare 5-year
integrated county development plans and the annual county budgets to implement
them.
Under Article 100(h) of the Act, county planning is expected to provide a platform for
unifying planning, budgeting, financing programmes, implementation and
performance review. A county planning unit shall be responsible for coordinated
integrated development planning. County plans will have the goal of promoting
harmony with national and other county plans, land-use plans, urban planning and
environmental conservation.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 129
The County Government Act, 2012, section 104 (1), states that a county government
shall plan for the county and no public funds shall be appropriated without a planning
framework developed by the county executive committee and approved by the county
assembly. It also states that the county planning framework (as in the definition
above) shall integrate economic, physical, social, environmental and spatial planning.
In addition to an integrated county development plan, each county is expected to have
the following:
a) A county sectoral plan
b) A county spatial plan
c) A city and urban areas plan
These county plans (section 107(2)) ―shall be the basis for all the budgeting and
planning in a county.
7.3.2. Transition to Devolved Government Act, 2012
Under the Transition to Devolved Government Act (2012), the transition authority is
expected ―to provide mechanisms for capacity building requirements of the new
county authorities to prepare the appropriate plans and budgets.
7.3.3. Public Finance Management Act (PFMA), 2012
The Public Finance Management Act (PFMA), 2012, emphasises what the County
Government Act states but puts a slightly different emphasis on planning. Whereas
the County Government Act requires a five-year County Integrated Development
Plan, the PFMA (Part IV (126) (1)) requires both a long-term and medium term plan.
According to the PFMA, a budget process for the county government in any financial
year shall consist of the following stages:
a) Start with an integrated development planning process, which shall contain both
shor-term and medium-term plans.
b) Every county shall prepare a development plan as per Article 220 (2) of the
constitution.
c) Budgets are to be based on projects and other expenditure contained in the plan.
7.3.4. Urban Areas and Cities Act, 2011
Urban Areas and Cities Act (2011) is also emphatic on the need for a 5-year
integrated development planning and the need to align annual budgeting to the plan.
These plans are separate from those of the county. In section 36(2), it states that an
integrated urban or city development plan shall bind, guide, and inform all planning
for development and decision-making and ensure comprehensive inclusion of
functions.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 130
7.4. CIDP Linkages with Kenya Vision 2030 and Medium Term Plan
Sessional Paper Number 10 of 2012 on Kenya Vision 2030 is the National Policy Economic
Blueprint that entrenches Kenya Vision 2030 as the long term development strategy for
Kenya. The Kenya Vision 2030 aims at transforming Kenya into a modern, globally
competitive, middle incomecountry providing a high quality of life to all its citizens. Kenya
Vision 2030 is a product of highly participatory, consultative and inclusive stakeholder‗s
process conducted throughout the country and in all sectors of the economy.
The Vision is anchored on three key pillars: Economic, social and political.
The economic pillar aims at achieving an average Gross Domestic Product (GDP) growth
rate of 10 per cent per annum and sustain the same till 2030 in order to generate more
resources to reinvigorate the economy to meet its envisaged goals and aspirations. The key
sectors in this pillar include: Tourism, agriculture and livestock, manufacturing, wholesale
and retail trade, Business Process Outsourcing (BPO) and financial services. A seventh
sector, oil and mineral resources, has now been added, taking cognisance of the recent
developments.
The social pillar seeks to build a just and cohesive society with social equity in a clean and
secure environment. The main sectors under this pillar include education and training, health,
water and irrigation, environment, housing and urbanisation, gender, sports, youth and
culture. The political pillar aims at realising a democratic political system founded on issue-
based politics that respect the rule of law and protects the fundamental rights and freedoms of
every individual in Kenya.
The three pillars are anchored on a number of foundations, which serve as enablers that create
an environment that is geared towards the realisation of Vision 2030. These include:
Macroeconomic stability; continuity in governance reforms; enhanced equity and wealth
creation opportunities for the poor; infrastructure; energy; science, technology and
innovation; land reforms; human resource development; security and public sector reforms.
An additional enabler - national values and ethics - has been included following the passing
of the Constitution of Kenya 2010.
The Kenya Vision 2030 is phased to be implemented in successive five-year medium-term
plans. The first plan covered the period 2008-2012. The Medium Term Plan (MTP 2013-17)
is the second in a series of successive five-year plans under which the Kenya Vision 2030 is
to be implemented. The second MTP 2013-2017 draws on lessons learnt in implementing the
first MTP. It seeks to implement the flagship projects identified under Vision 2030 over the
five-year period together with incomplete flagship and other projects and programmes in the
previous MTP. It will also take due cognisance of the devolved structure of government
following promulgation of the Constitution of Kenya 2010 and recent discovery of oil and
mineral resources.
The broad key priority areas,which will be the focus of the second MTP include:
Employment creation; development of human resource through expansion and improvement
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 131
in quality education, health and other social services; reducing the dependence of the
economy on rain fed agriculture through expansion of irrigation; higher investment in
alternative and green sources of energy; improving the economy‗s competitiveness through
increased investment and modernization of infrastructure; increasing the ratio of saving,
investment and exports to GDP; implementation of key Kenya Vision 2030 Flagship projects,
including development of LAPSSET Corridor; improving national security; promoting
national values and ethics; and continue implementing the constitution.
County Government Act, 2012, stipulates that county government shall plan for the county
and no public funds shall be appropriated outside a planning framework developed by the
county executive committee and approved by the county assembly. This Act, along with the
Public Financial Management Act, 2012, therefore calls for preparation of a County
Integrated Development Plans (CIDPs), which must be aligned to the national development
plan. In view of this, CIDPs and other plans provided in the County Government Act will be
aligned to Kenya Vision 2030 and the MTP 2013-2017. As such, CIDPs will provide the
essential linkages of the national and county governments by facilitating the implementation
of Vision 2030 flagship projects as well as other projects and programmes that will ensure
implementation of Kenya Vision 2030 at both levels of government.
County governments must, therefore, embrace the Kenya Vision 2030 and MTPs during
preparation of county development plans. In particular, they are envisaged to support
implementation of Vision 2030 flagship projects that may be domiciled in or cut across the
counties. In addition, counties will need to identify specific projects and programmes for
implementation over the medium term period towards achievement of the Kenya Vision 2030
and MDGs.
The county development profiles form the basis for county planning and development
process by providing the requisite benchmarks and information required for preparation of
the CIDPs.
7.5. CIDP Linkages with the Kenya Constitution, 2010
The Constitution of Kenya (2010) prescribes national values and principles of governance
which include sharing and devolution of power. It creates a two-tier government: a national
government and 47 county governments. The Fourth Schedule delineates the functions of the
national and county governments. A total of 14 functions have been devolved to the counties.
The main ones include: county planning and development; agriculture; county health
services; control of air pollution, noise pollution, other public nuisances and outdoor
advertising; cultural activities, public entertainment and public amenities; county roads and
transport; animal control and welfare; trade development and regulation; pre-primary
education and village polytechnics; specific national government policies on natural
resources and environmental conservation; county public works and services; fire fighting
services and disaster management; and, control of drugs and pornography. Emphasis is also
made for the counties to ensure participatory development and capacities are developed at the
county and community level.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 132
Five laws which provide the framework for devolution have been enacted, namely: Urban
Areas and Cities Act, 2011; The County Governments Act, 2012; The Transition to Devolved
Government Act, 2012; The Intergovernmental Relations Act, 2012 and The Public Finance
Management Act, 2012.
The PFM Act 2012 provides for effective and efficient management of public resources.
Article 125 of the Act requires the budget process for county governments in any financial
year to consist of integrated development planning process which include long term and
medium term planning as well as financial and economic priorities for the county over the
medium term. Articles 126 of the Act further obligates each county government to prepare an
integrated development plan that includes strategic priorities for the medium term that reflect
the county government's priorities and plans, a description of how the county government is
responding to changes in the financial and economic environment; and, programmes to be
delivered.
The county governments are composed of the county executive committee and county
assemblies. The county executive committee is expected to supervise the administration and
delivery of services to citizens as well as conceptualise and implement policies and county
legislation. The county assembly is a legislative organ and will play an oversight role on all
county public institutions including the urban areas and cities. The county governments are
required to prepare the CIDPs to enable prioritisation of socio-economic development issues
at the local level. This is mandatory before the funding of county projects and programmes.
The CIDP, therefore, seeks meet this requirement and ensure that there is a comprehensive
planning tool upon which planning at the county can be done as per the requirement of the
constitution of Kenya 2010 and other legislations thereafter.
7.6. Implementation of Millennium Development Goals at the county
The Millennium Development Goals (MDGs) are internationally accepted standards for
measuring progress towards poverty alleviation. They were agreed upon at the UN
Millennium Summit in 2000 where world leaders made and adopted a declaration to ―free
all men, women and children from the abject and dehumanising conditions of extreme
poverty’. The eight MDGs to be met by 2015 are drawn from this declaration. The eight
MDGs have time-bound targets and indicators for measuring progress in the areas of: poverty
alleviation, education, gender equality and empowerment of women, child and maternal
health, reducing HIV/AIDS and communicable diseases, environmental sustainability, and
building a Global Partnership for Development. Kenya is one of the signatories to the
declaration and is committed to achieving the MDGs. This commitment has resulted in
commendable progress in achieving a number of these goals though some are still facing
challenges. As we pursue development agenda at the county level, we need to fast track the
achievement of these goals. With only two years to the end of the MDGs period, a group of
world leaders appointed by the UN secretary general are working together to find the best
way to tackle global agenda on development after 2015. The post 2015 agenda will have
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 133
shared responsibilities for all countries and with the fight against poverty and sustainable
development at its core. This agenda will be cascaded in the MTP and CIDPs in order to
build upon commitments already made and contribute to the acceleration of achievement of
the targets both at the national and county levels.
Some of the challenges facing the achievement of MDGs in Baringo County are: Inadequate
resources for financing MDGs related activities; Declining agricultural production due to
unpredictable rain patterns and land fragmentation; high population growth rate; over reliance
on agriculture and export of unprocessed agricultural products; and Illegal and extensive
logging without replacing the felled/cleared trees/forests.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 134
Chapter Eight
Resource Mobilisation Framework
8.1. Introduction
This resource mobilisation strategy is developed cognizant of the tremendous
development challenges faced by Baringo County; with the realisation that Baringo
County Government will take the lead in raising revenues for development. This
chapter contains a budget projection required for managing the county government. It
also indicates the resources that are available for capital projects development. It
outlines strategies for raising revenue and their projected for the plan period. In
addition, strategies for asset management, financial management, and capital
financing are included. This includes, but not limited to, strategies to expand the
revenue generation, resource sharing with the central government, means of attracting
external funding. This strategy, therefore, provides the basis for mobilising funds
required to support the county government mandate.
8.2. Trends
Funding for county government is anchored in the Kenya Constitution, which
provides that the not less than 15 per cent of audited accounts in government shall be
disbursed to the County Government. In 2012-2013 financial years, the County
Government of Baringo received Sh3.4 Billion. It is anticipated that this shall increase
annually as the national budget increases and as the Baringo County economy grows.
8.3. Constraints to resource mobilisation:
Although it is anticipated that resource mobilisation will yield more than just money,
past experience shows that a great deal of funds are not channelled to proper priorities
nor applied nor applied to contributing to holistic growth in development. The County
Government of Baringo will put structures in place and enact legislation to ensure
effective application of funds.Specifically, the county will endeavour to get value for
money and will properly harmonise use of funds to reduce transaction costs.
This involves enlisting of all necessary resources, be they human, material or services,
to achieve specific goals. It involves the mobilisation of knowledge for human use of
skills, equipment and services.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 135
The first step will be resource mapping, which includes:
1. Assessment of the baseline position of the resources
2. Identifying required resources for the project
3. Comparing what is needed and what is available to determine the gaps
4. Identifying potential sources of needed resources and
5. Outlining best strategies for approaching stakeholders (donors and partners)
6. Outlining monitoring and review mechanisms.
7. Documentation of all activities
8.4. Capital projects funding
Capital projects as contained in this plan will be funded through budgetary allocation
from the central government, through the resources raised from the local sources and
through grants and loans from development partners. There will also private sector-
public sector collaboration.
8.5. Strategies for raising revenue
The Kenya Government is increasingly constrained in mobilising the required
financial and technical resources to cope with the rising demand for development
projects and provision of services. Rapid economic growth, growing urban
population, increasing rural–urban migration, and all-round social and economic
development have compounded the pressure on the existing infrastructure, and
increased the demand-supply gap. Further, donor commitments, though appealing,
have been unable to bridge the financial requirements gap.
National governments in developing as well as developed countries have been using
Public Private Partnerships (PPPs) arrangements for improved delivery of services.
Governments have built or are building transport (roads, railways, toll bridges),
education (schools and universities), healthcare (hospitals and clinics), waste
management (collection, waste-to-energy plants), and water (collection, treatment,
and distribution) infrastructure through PPPs. PPPs are, therefore, becoming the
preferred method for public procurement of infrastructural services throughout the
world.
In Kenya, there has been considerable progress in the last 5 years in attracting private
investment into the country. There is however, potential for PPPs to contribute more
and help bridge the gap. To this end, the Kenyan Government has developed a PPPs
framework which will be modified by the government of Baringo to address local
concerns.
Baringo County will strive to use the developed framework, host forums and
conferences to woo investors. The county will further be compelled to explore new
and innovative financing methods in which private sector investment can be attracted
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 136
through a mutually agreed arrangement. Since neither the public sector nor the private
sector can meet the financial requirements in isolation, the PPPs model presents a
logical, viable and necessary option for them to work together. It is hoped that PPPs
will deliver efficiency gains and enhanced impact of the investments. The efficient
use of resources, availability of modern technology, better project design and
implementation, and improved operations combine to deliver efficiency and
effectiveness gains, which are not readily produced in a public sector project. Further,
the long gestation period of infrastructure projects requires sustainable financial and
operational capacity. Therefore, there is increasing reluctance in both the public and
private sectors to absorb all the costs and assume all the risks of building and
operating these assets alone.
The county also expects to gain from resources mobilized by the national treasury.
According to Article 226 of the Constitution, it is the duty of the national treasury to
mobilize domestic and external resources for financing national and county
government. Loans will another source of funding. The county treasury is in charge of
mobilising resources for funding the budgetary requirements of the county
government and putting in place mechanisms to raise revenue and resources.
The county also expects to receive grants from development partners for various
projects. It should be noted that under the PFM Act 2012, regulations approved by
parliament shall provide for the administration, control and management of grants,
including procedures to ensure that grants are spent on the basis of the ICDP.
8.6. Establishment of Baringo investment vehicle (Baringo Investment Corporation)
This will be established to make Baringo a county of choice for investments. It will be
organized along the lines of the Kenya Investment Authority created by the
Investment Promotion Act No. 6 of 2004. It will also formatted along the lines of
Industrial and Commercial Development Company (ICDC).
Its principal mission will be to attract, facilitate, retain and expand county, intra-
county, national and international investments to Baringo. Because of the many
requests for factories and other commercially viable investments, it is proposed that
this investment vehicle shall operate a capital fund that can take debt and equity
positions in strategic projects. This fund shall be run strictly along standard venture
capital practices, including a maximum exposure, project feasibility and stringent exit
requirements.
8.6.1. Mandate
Its main mandate will be promoting investments in Baringo. It will be responsible for
facilitating the implementation of new investment projects, providing after care
services for new and existing investments, as well as organising investment promotion
activities within the county, nationally and internationally.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 137
The core functions of Baringo Investment Corporation will include: Investment fund
management, investment promotion; investment facilitation, which includes investor
tracking and after care services. The activities are carried out through the following
strategies:
Establishment of holding companies to invest on behalf of the county
Generate income for Baringo County.
Research, policy advocacy and planning: Undertake research, review and analyse
policies, and engage in policy advocacy geared towards improving the business
environment.
Investment promotion and marketing: Targeting and attracting investments to
achieve increased economic development.
Investor services: Ensuring expeditious and quality facilitation of projects for prompt
implementation and effective after care services.
Corporate governance and ethics: Uphold good corporate profile for Baringo
County and ensure observance of good corporate governance and attend to legal
affairs related to the investors.
Internal Audit: Monitor and evaluate management policies, procedures, regulations
and systems to ensure compliance with the best practices for effective utilisation of
organisational resources.
8.7. Assets and financial management
The national treasury is expected to design and prescribe an efficient financial
management system for the national and county governments to ensure transparent
financial management and standard financial reporting as contemplated by Article 226
of the Constitution. The county treasury, subject to the Constitution, will monitor,
evaluate and oversee the management of public finances and economic affairs of the
county government, including developing and implementing financial and economic
policies in the county; preparing the annual budget for the county and coordinating
the preparation of estimates of revenue and expenditure of the county government;
coordinating the implementation of the budget of the county government; mobilizing
resources for funding the budgetary requirements of the county government and
putting in place mechanisms to raise revenue and resources.
The County Treasury will also ensure compliance with accounting standards
prescribed and published by the Accounting Standards Board from time to time. It
will also ensure proper management and control of, and accounting for the finances of
the county government and its entities in order to promote efficient and effective use
of the county's budgetary resources.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 138
8.8. Resources from the National Government
To support the devolution framework, several acts of parliament have been enacted:
The Urban and Cities Act 2011; The County Government Act, 2012; The transition to
Devolved Government Act 2012; The Inter-government Relations Act, 2012; The
Public finance management Act, 2012; The County Government Public Finance
Transition Act, 2013. The Constitution and many of these laws require ―integrated
development planning‖ as the process of enhancing efficiency and effectiveness of
budget fund and mechanism for addressing the county mandate under the
Construction of Kenya, 2010.
Release of funds from the national government will depend on whether a county has
developed an Integrated Development Plan. Part XI of the County Government Act
2012 obligates the county government to ensure harmony of the integrated
development plan with the national plans, and other sub-county plans such as sectoral
plans, spatial plans and urban and city plans which are located in the county. In
accordance with article 106, the plan will thereby provide mechanisms for linking the
county and national planning processes with the MTEF budgetary system.
The budget process for county governments consists of an integrated development
planning process, which include both long term and medium term planning. The
integrated plan establishes financial and economic priorities for the county over the
medium term and makes an overall estimation of the county government's revenues
and expenditures. Based on the Commission on Revenue Allocation, Baringo County
is expected to receive Sh3.4 B for the financial year 2013/14. This allocation has been
determined based on the county population (45%), poverty index (20%), land area
(8%) basic equal share (25%) and fiscal responsibility (2%). Although prorated,
prudent public resource management as stipulated in the PFM Act 2012 will
determine the amount the county receives in future on fiscal responsibility.
8.9. Strategies for Mobilising Baringo County human capital
The Baringo County Government will mobilise and establish a databank of
Professionals from Baringo who reside within the County itself, nationally and
internationally to engage them in the development of Baringo County. It will
specifically engage the people of Baringo in diaspora in investments and
developments in Baringo.
Other national and international friends and well-wishers of Baringo will also be
engaged.
The governor‘s office will delegate the county executive in charge of human resource
to coordinate this function.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 139
8.10. Other strategies for Mobilising county resources
This will include:
a) Proceeds from royalties for minerals including petroleum, steam and water.
b) Proceeds from investments by the counties Corporations in energy, factories,
hotels and buildings.
c) Selling commercial paper with the concordance of the national government.
d) Developing housing bonds.
e) Setting up county lotteries to fund such programs as; sports, education, loans
and roads.
f) Engaging the national government to offer tax incentives to potential
investors.
g) Using the Built, Operate, and Transfer Model (BOT) to put up social and
commercial infrastructure.
h) Conscessioning of roads and other infrastructure.
i) Mobilizing land rates and other property taxes under the county government.
j) Preparing and implementing policy to govern development of public land
allocated to investors with a view to optimal collection of revenue.
k) Entry fees from game reserves.
l) Proceeds from cess on agricultural produce.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 140
Chapter Nine
Investment Framework
Introduction
This chapter on investment framework seeks to provide a mechanism for the government
to allocate its resources among the various projects proposed to questions such as how
the identified projects will be selected and how they will be financed.
9.1. Allocation of resources among sectors
The executive shall determine the allocation of resource among the various counties in
the county. The following is suggested as a guideline:
Table 44: Consideration for resource allocation among sectors
Sector Target Rationale
Agriculture and Rural
Development
10% of budget and 6%
Annual growth in agriculture
Maputo Declaration, July 2003
Health 15% of budget to health Abuja Declaration
Energy, Infrastructure and
ICT
for every 1% growth in the
economy there must be a 2%
growth in energy supply
Rule of thumb
9.2. Project selection framework
1. Feasibility assessments will be conducted before any projects are implemented to
ensure that projects are viable.
2. The county government shall provide guidelines for the evaluation of all projects
to determine their feasibility and cost effectiveness before they are implemented.
3. The county government shall identify the criteria against which every project will
be scored and a weight against which each of these factors shall be applied. An
initial set of factors and corresponding weights is defined below:
4. All projects shall be scored against these factors and then ranked based on their
scores.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 141
Table 45: Weights to be assigned to different factors when selecting projects
Factor Weight
(points)
Rationale
Prioritisation from
community
-5 to 15 Ensures that community interests are well taken care of. A project with
a negative rating means there are members in the community who do
not want the project.
Prioritisation by
experts /heads of
department
10 Allows government officials to provide their professional inputs
onwhich projects are implemented.
Prioritisation on
strategic basis
20 Allows the county leadership to provide their scoring against each
project to give priority to projects that have strategic value to the
county.
Impact on people 20 Allows ranking of projects based on their impact on security, job
creation, health, education, equity and disaster preparedness.
Impact on
environment
-5 to 5 Allows the promotion of projects that have a positive contribution to
the environment
Impact on the local
economy
10 Allows for the promotion of projects that have a significant impact on
job creation, wealth creation and opening up investment opportunities.
Total 100
9.3. Public investments
1. Public spending will include administrative, social and infrastructural expenditure
2. The constitution requires county governments to further the cause of devolution
beyond the county level. To attain this, the county government shall set aside at least
15 per cent of its development budget for a Ward Development Kitty, which shall be
used for the financing of projects at the ward level. This fund shall operate along the
same lines as the constituency development fund but shall be administered by the
county executive with the participation of the community.
3. The county government shall ensure that the ward development fund is distributed
equitably among the wards, having regard to a need for equalization among the wards.
The county government shall also set aside 0.5 per cent of its budget for an
equalization kitty, which shall be used to address development in marginalised areas.
4. The county government shall ensure there is prudent use of resources deployed to the
ward development fund.
5. The county government shall identify flagship projects at the county and sub-county
levels. Flagship projects shall not include routine programmes and services, but shall
be transformative projects with significant impacts among multiple stakeholders.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 142
6. Flagship projects at the sub-county level shall be implemented using the resources of
the constituency development fund with additional support (if requested) from the
county government.
Figure 20 : Development through use of public funds
9.4. Private investments
1. The county government shall maintain an investor friendly business environment. In
particular, the county government shall ensure there are no undue delays in the
licensing of businesses or unjustified barriers.
2. The county government shall earmark and publicise projects for investment by the
private sector as well as projects suitable for PPP investment
3. The county government shall facilitate the mobilisation of resources through
cooperative societies and investment clubs.
9.5. Public-Private Partnerships
1. The county government shall establish a PPP node as a contracting agency in
accordance with the Public-Private Partnerships Act.
2. The Baringo PPP node shall actively develop PPP projects in all sectors in accordance
to the law.
9.6. Public-Public Partnerships
The county government is encouraged to pursue partnerships with other public institutions:
1. The county government of Baringo shall pursue partnerships with county
governments, the national government and parastatals provided they remain within
the parameters defined by the intergovernmental relations act.
2. The county government shall enhance cooperation and benchmarking with other East
African national and regional governments.
3. The county government shall cooperate with the UN and other international
organizations for the benefit of the people of Baringo.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 143
4. The county government shall actively pursue international partnerships with other
towns and cities such as twinning urban areas and shall make effort to join the R20
group of regional authorities.
5. The county government shall actively seek opportunities for south-south cooperation
including hosting and participating in trade fairs, sports activities and exchange
programmes.
6. The county government shall maintain cordial relations with other non-state actors
e.g. NGOs, the media and professional bodies and actively pursue beneficial
partnerships with them.
9.7. Role of public procurement in the economic development
The government being the biggest spender has the opportunity to stimulate development,
especially in the manufacturing sector through public procurement. This provides a means
for the capitalisation of local enterprises, development of local capacity and creation of
jobs.
The county government shall set up and operationalise a policy to guide the use of public
procurement to promote economic and social development along the following lines:
1. The county government shall reserve at least 30 per cent of all public procurement
for youth and women led enterprises.
2. The county government shall procure not less than 50 per cent of its furniture and
uniforms (clothing) from local manufacturers.
3. The county government shall establish a procurement window for locally
manufactured products and define a list of additional products that shall be given
preferential procurement when locally manufactured.
4. Where the county government undertakes any construction activity, at least 30 per
cent of the wood, metal and concrete products shall be fabricated locally unless
local capacity is reliably established to be absent, or exemption has been granted
by the county assembly. Additional services e.g. clerical work, transport, unskilled
labour and security shall also be procured locally.
5. The county government shall not procure more than 50 per cent of its hospitality
services from outside the county.
6. The county government shall spend at least 15 per cent of its advertising spend on
local media institutions to promote the growth of homegrown media.
7. Where local capacity is absent, the county government shall require external
contractors to subcontract at least 15 per cent of their work to local firms.
8. The county government shall provide additional incentives for companies that
form consortia to encourage cooperation within the sub-sectors.
9. The county government shall offer procurement opportunities for all sizes of
enterprise and encourage graduation and improvement in quality and size among
its suppliers
10. The county government shall automate its procurement systems and promote
transparency and efficiency in its operations.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 144
11. The county government shall report to its adherence to the above guidelines on an
annual basis
12. The county government shall take measures to increase the capacity of local firms
to participate in the procurement of the national government.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 145
Chapter Ten
InstitutionalFramework The chapter outlines the institutional framework and organisational flow that will be followed
in implementing the plan. It also outlines the stakeholders in the county, and the roles that
they play and how their functions are accommodated to avoid duplication of efforts.
10.1. Sectoral plans
CIDP shall be implemented through sectoral plans which shall be developed for the following
sectors as required by section 107 of the County Governments Act.
Sector Subsectors
Agriculture and rural development Livestock, agriculture, fisheries
General economic and commercial
affairs
Commerce and trade, tourism, industry, enterprise development,
cooperatives
Energy, infrastructure Roads, airstrips, energy, transport, public works
Land, environmental protection,
water and housing
Environment, forest, land, survey, mining, housing, physical
planning, water, irrigation, sanitation
Health Medical, public health
Education and ICT ECD, village polytechnics, ICT
Governance, justice, law and order County assembly, disaster management, peace building
Social protection culture and
recreation
Labour, women, children, persons with disabilities, elderly, youth,
minorities and vulnerable groups
Public administration and
international relations
County executive, economic planning, statistics
Spatial plan
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 146
10.2. Organisational flow
Figure 21 : Organisation of the County Government of Baringo
10.3. Devolved County Level Units
The units are responsible for policy formulation, guidance, service provision and
enforcement of rules and regulations. The units are also responsible for prioritizing in
their operational areas.
County
Government
COUNTY
ASSEMBLY
COUNTY
SPEAKER
COUNTY
ASSEMBLY
MEMBERS
COUNTY
ASSEMBLY
COMMITTEES
COUNTY
ASSEMBLY
SECRETARIAT
COUNTY
PUBLIC
SERVICE
BOARD
COUNTY
PUBLIC SERVICE
BOARD
SECRETARIAT
Governor
Deputy Govenor
County Executive
Members
Chief Officers
Directors of
Departments
Officers and Support
Service Providers
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 147
CIDP Implementation Secretariat Headed by a Director based in the Governor‗s
Office, will be responsible for tracking and ensuring the Implementation of the plans
and proposals of the CIDP across all sectors. The Secretariat will also guide annual
reviews of the CIDP as may be necessary in Consultation with the County
Departments of Planning.
The Secretariat will ensure the creation of appropriate policies to guide development
programs in Baringo County. The Annual Budget of Baringo provides funds for
development of policies and legislations in Baringo County.
Stakeholders: Are responsible for prioritizing county programmes and projects while
ensuring sustainability and ownership. They also fund programmes and projects.
Stakeholders: Are responsible for prioritizing county programmes and projects while
ensuring sustainability and ownership. They also fund programmes and projects.
10.4. Stakeholders in the County
Table 46: Stakeholders and their roles in Baringo County
Stakeholder Role
Cabinet office Ensure quality and timely approval of policies
CDF/CDTF Construction, rehabilitation, equipping of facilities in the county
Church Participate in decision making
Civil society organisations Creation of awareness on rights and privileges of the public
Management and promotion of good governance through advocacy of the rights of
the minority and farmers.
Management and promotion of good governance.
Support the sector through hand washing in educational facilities, provision of
equipment, water facilities, construction of facilities, and watchdog for quality
service delivery and supporting the school feeding programme.
Drilling of water points, toilets. Establishment of biogas units, mobilisation of the
community.
Civic education
Orphan support;
Extension service and micro finance
Community
to monitor projects
Utilise infrastructural facilities, provision of skilled/ unskilled labour;
Identify facilities to be repaired/ rehabilitated.
Participate in decision making on issues affecting the sector and provide factors of
production for use by the sector
Care and provide for the sick;
Provide land to construct facilities;
Actively support the community strategies through active participation;
To actively participate in and contribute to the provision of facilities through cost
sharing;
Community policing, collaboration with security agents;
Active participation in prioritization of projects and provide information on
corruption;
Engage in farming, production of food crops, conservation of hill tops, provision of
labour to be used in the sector and the management of private tree nurseries and on
farm tree planting.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 148
Stakeholder Role
Construction of toilets and spring protection.
Development Committees Mainstreaming gender, youth, physically challenged and other disadvantaged
groups issues into development programmes
Directorate of E-GOK Facilitating provision of E-GOK services, email, web-enabled services.
Donors Inject new resources in form of credit, grants and material support.
Farmers‘ Organisations;
SACCOs
Extension services and community mobilization.
Finance Institutions Avail credit; create awareness
National Government
Ministries/Departments
Policy formulation, guidance, service provision and enforcement of rules and
regulations
Kenya Diary Board Regulation of milk marketing
Kenya National Bureau
of Statistics (KNBS)
Collection and dissemination of consumable data for planning purposes
Local Authorities Maintain unclassified roads, Put up new river crossings
Open new roads. To promote the growth of ICT through faster licensing of outlets
Provide grants for school infrastructure development Ensure adequate
environmental sanitation.
Maendeleo ya Wanawake Advocate for the right of women and the girl child
Siret Empowerment Co.
Ltd.
Owners of Siret Tea Estate and Factory. Investors in Real Estate across Baringo
County and Scholarship programs for their members and the local Community.
National Aids Control
Council
Provide policy guidance on halting and the reversing the spread of HIV/AIDS;
Support OVCs and People Living with HIV/AIDS
National Council for
Persons with Disability
Enhance capacity of disabled person‗s organizations, institutions and individuals;
Support educational institutions for physically challenged
NEMA Environmental audit (EIAs).
Parliament Formulation and passage of sector laws & policies, provision of conducive legal
environment
Private Sector Partners in service provision;
Employment creation;
Promotion of private enterprises and competition and supplement government
effort through PPP Formulation of priorities.
Red Cross Distribution of relief foods and of medical supplies during emergencies and
capacity building on disaster management
Trade Unions Promotion of HR management & Development and welfare of works
The National
Government
Policy guidance, formulation of conducive laws and training on management skills,
enforcement of laws, dispensation of justice, conducting of elections, provision of
travel documents and certificates.
Tourists Promote investment in conservation of tourist attraction areas/sites
Transport Service
Providers
Provide public transport services to all stakeholders
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 149
Chapter Eleven
Development Programmes and Projects
11.1. Introduction
This chapter presents the projects and programmes that will be undertaken to realize the aspirations of the county. The analysis has been done in line with the
following MTEF sector working groups: Agriculture and Rural Development; General Economic, Commercial and Labor Affairs; Energy, Infrastructure and
ICT; Environmental Protection Water and Housing; Health; Education; Governance, Justice, Law and Order; Public Administration and International
Relations; and Social Protection Culture and Recreation. For each of the sector, the sector vision and mission is presented and the county‘s response to the
vision and mission is also discussed. The chapter also discusses the importance and role of stakeholders in each sector. The county priorities, constraints and
strategies are also discussed. The chapter contains a list of ongoing projects and programmes in each sector to be completed before the end of the plan period
to ensure sustainable growth and poverty reduction.
11.2. County Flagship Projects/Programmes
Table 47: Proposed Flagship Projects
Sector Project/Programme Name Sub-County Description of activities
General Economic Comprehensive Baseline
Survey, Resource Mapping
and CIDP Delivery
Environment
Countywide Resource and Baseline Surveys
Establishment of Environmental and Socio-economic monitoring system
Establishment of County Wide ICT Network
Establishment of Data Centres
Purchase of ICT Equipment and Development of Systems
Capacity Development
Land and Urban Establishment of Spatial Countywide Establishment of the Spatial Plan and a countywide GIS system
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 150
Sector Project/Programme Name Sub-County Description of activities
Development Infrastructure Upgrading the Survey System, Digitizing land recordsand Issuance of Land
Titles
Establishment of a Land Bank and reclamation of grabbed land
Development of Capacity in the sector
Water and Irrigation Oke Dam Baringo Central Dam already designed.
Construction of dam, treatment works, gravity pipelines, storage tank,
distribution pipelines and canals
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
1500 HHs and 2700 hectares under irrigation
Amaya Dam Tiati
1.4.2
Investigate, Plan and Design Dam
Construction of dam, treatment works, gravity pipelines, storage tank,
distribution pipelines and canals
Increase water storage and harvesting capacity;
2500 HHs and 2700 hectares under irrigation
Transport County Economic Roads
Tiati/
Baringo North/
Baringo Central
Eldama Ravine
Uasin Gishu + Elgeyo
Marakwet Counties
Timboroa- Seguton– Moringwo – Kapcholoi – Sigoro – Sirwa – Tenges-Ochii –
Mogorwo - Kapkayo – Kapkelelwa – Oinobmoi - Kinyach – Kolowa
(D364,R15,E1431,E333)
Mogotio- Baringo South Mogotio – Kipkitur – Kisanana – Waseges – Mochongoi
Baringo South + Laikipia
County
Karandi – Mochongoi – Marigat to join C51
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 151
Sector Project/Programme Name Sub-County Description of activities
Baringo South, Mogotio Kipkitur – Emsos – Majimoto – Loboi (D365)
Baringo South, Baringo
North
Kampi Samaki – Kipcherere – Kasisit - Kabartonjo – Kapkiamo – Barwessa
(D364)
Tiati, Baringo South,
Baringo North
Tourism Ring Roads: Loruk-Komolion-Rugus-Kiserian-Logumgum-Sandai-
Bogoria
National Security Roads Tiati, Baringo North +
Elgeyo Marakwet + Trans
Nzoia
Loruk – Lomuyek – Yatya – Chepkesim – Kapturo – Kalabata – Kinyach –
Arror – Kapsowar-To Kitale.(C77)
Tiati, Baringo North Kipsaraman – Bartabwa – Kapturo- Kositei - Chemolingot \
Tiati, Baringo South,
Laikipia County
Kiserian-Mukutani-Sosion-Kaptuya-Muge-Rumuruti
Mukutani-Ngelecha-Kinamba
Baringo South, Mogotio,
Laikipia County
Kiserian- Ramacha-Chemorongion-Nyimbei-Nyalilbuch-Waseges-Kiribot-
Kabuswa-Mbogoini
Tiati, Samburu, Turkana Nasorot-Maloso-Losuk
Geothermal Roads Tiati – Samburu Nadome-Nasorot-Akwichatis-Orus-Kokwototo-Tangulbei
Tiati Silale – Naudo-Nginyang
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 152
Sector Project/Programme Name Sub-County Description of activities
Tiati Kapedo-Barpelo-Ngoron
Tiati, Baringo North Chemolingot-Loiwat
Tiati Tangulbei-Kadokoi-Nginyang
Aviation Eldama Ravine Development of the Kabimoi FTC and Kimalel Airstrips to all weather standard
Baringo South
Health Upgrading of a Kabarnet Sub-
County Hospital to Level 5
Countywide Upgrading Kabarnet district hospital to level 5
Tourism Development of Kamnarok
Game Reserve
Baringo North Infrastructure improvement and reserve conservation
Education Establish 3 New Technical
Institutions in 3 sub counties
Baringo South Eldama
Ravine
Baringo North
Land acquisition
Construction of infrastructure
Equipping
Establish one Public
University
One university with
constituent colleges in
other sub-counties
Land acquisition
Construction of infrastructure
Collaboration with existing institutions
Establishment of libraries One in each sub-county
that does not have
Land acquisition
Construction of infrastructure
Equipping and Supply of Books
Industrial Establishment of an Industrial
Park / Corridor
Eldama Ravine
Mogotio Baringo South
Baringo North
Tiati
Land acquisition
Servicing and construction of industrial grade infrastructure
EPZ along Sabatia, Maji Mazuri, Timboroa, Nginyang
PPP Investments in
Agriculture, Livestock
and Fisheries
Establishment of Fish Value
Chain Facility
Baringo North Hatchery
Fish Processing Plant
Fish Feeds Factory
Development of Fish Farming
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 153
Sector Project/Programme Name Sub-County Description of activities
Centre of Excellence in
livestock production and meat
Processing
Baringo South Establishment of a facility including a veterinary investigation laboratory with
satellite labs in all other sub counties, a fattening ranch, a countywide livestock
registry, and a training centre.
Dairy Processing Plant Eldama Ravine Partnership Building
Establishment and Capitalization of Special Purpose Vehicle
Facility Design
Procurement
Construction
Operation
Potato Cold Storage Plant Eldama Ravine
Leather Development Centre Mogotio
Loruk and Barwessa
International Class
Slaughterhouse
Tiati / Baringo North
Fruit and Nut Processing Baringo Central (Kerio
Valley) and Baringo South
(Marigat)
Energy Establishment of the Baringo
Energy Corporation
Countywide Establishment and Capitalization of a county corporation to undertake Rural
Electrification and develop
Geothermal, Wind, Solar, Hydro Electric and Bioenergy Resources in the county
Youth Establishment of Youth
Empowerment Centres
1 in every subcounty Construct and Equip the Youth Centres
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 154
11.3. Agriculture and Rural Development
The Agricultural and Rural Development (ARD) Sector comprises of the following eight sub-
sectors: Agriculture; Livestock Development; Cooperative Development and Marketing;
Lands; Fisheries Development; Forestry and Wildlife; National Land Commission and
Agricultural Research & Development (ARD).
Vision:
A food secure, competitive and productive Baringo County.
Mission:
To improve livelihoods through promotion of competitive agriculture, innovative
research, growth of a viable cooperatives sub sector, and sustainable management of
land,forestry and wildlife resources.
County Response to Sector Vision and Mission
This is major sector in the county since 80 per cent of the population depends on agriculture
for their livelihood. Agricultural production however has been varying over the years
depending on the amount of rainfall received per year. The county will strive to increase crop
and livestock production so as to attain food security and provide marketing of farm and
livestock produce. In addition promotion of drought resistant crops and small scale irrigation
will be adopted.The cooperative development and marketing sub sector will also be
improved. Construction of honey refinery will be a priority in order to add value to the
locally produced honey. Farmers will be encouraged to form marketing societies for their
farm produce and livestock so as to reduce exploitation from middle men.
Role of stakeholders
Stakeholder Roles
Agriculture Department Provision of extension services to the farmers;Agricultural information
management;Provision of technical advice; Farm mechanization; Soil and water
conservation; Value addition of farm produce
Fisheries Department Fisheries extension services; Fish value addition
Veterinary Department Undertake Vaccination;Veterinary vector control and disease treatment;
Provision of clinical services for animals;Artificial Insemination (AI);
Veterinary public health; Hides and skins and leather technologyBranding
Livestock production Pasture and fodder development; Rangeland reseeding; Animal husbandry practices;
Livestock marketing; Value addition of livestock products
Co-operative Development Enforcement of the co-operatives society Act and promoting the growth and development
of the co-operative sub-sector;Organization of farmers association to secure loans from the
financial institutions;
Research Institutions Research on appropriate farming technologies;Research on viable crops and livestock
breeds;
NEMA Coordinate environment management issues; Promote the integration of environment
concerns into development plans; Monitoring and valuating activities that have an impact
on the environment;
ALRMP II Restocking, capacity building of local groups on farming.
SACCOS, Micro-finance
institutions ,Banks
Provision of credit facilities to farmers for improving their inputs;
Private Sector, NGOS,CBOS
and FBOS
Capacity building in participatory development;Financial support to development
projects;Environmental conservation ;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 155
On-going Projects and Programmes
(a) Flagship Projects: Agriculture, Livestock and Fisheries Development
Project Name Objectives Targets Description of Activities
1. Fish farming-Mogotio/
Eldama Ravine
Diversify income to the farmers All existing water pans and dams Stocking of water pans and dams with fish
2. Expansion of Fish Farming
county wide.
Promotion of fish farming as an
economic activity
50 new fish ponds per sub county
Stock 20 public dams in the county
every year
Provision of credit, Extension services and capacity building
to farmers
-County zoning
3. Potato cold storage facility Increase the shelf life of potatoes All potatoes growing areas within
Koibatek
Construction of cold storage facility
4.Disease control Creation of a disease-free zone
county wide
Livestock Vaccination Vaccination of livestock
Continuous disease surveys Disease surveillance and reporting, collection of samples for
disease diagnosis
Livestock movement control
Livestock route inspection;
Certification of livestock markets and sale yards;
Quarantine of disease outbreak areas;
5. Milk processing plant Increase value of milk, create wealth
and employment
Establish a milk processing plant in
Koibatek
Mobilize PPP investment in construction and
operationalization of a milk processing plant
6.Green houses and
demonstrations (horticulture)
To enhance horticultural production,
crop yield productivity and intensify
land under crop production
Install 150 green houses (5 per
ward)
Purchase green houses and irrigation kits
Train farmers on green house production technology
7.Veterinary Investigation
Laboratory
Intensify Disease surveillance 1 main lab and 5 satellite labs Setting up of VIL and 5 satellites and equipping of the same
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 156
(b) Other projects
Project Name
Location/ Sub-county/
Constituency
Objectives Targets Description of Activities
Water-harvesting for food
security projects.
To harvest rain water and
development of water storage
infrastructure for agricultural
production
10 Water-pans in the county Water-pan construction.
Farmers group use of the structure.
Subsidized fertilizer and other
farm inputs program
To improve on food security and
reduce poverty
30,000 farmers in the county Provision of fertilizer at an affordable price;
Promote establishment of Muchukwo KARI sub centre
Orphan crops development
programme
To avail high quality planting
material to farmers for seed
multiplication.
24 Farmers groups. Provision of planting materials;
Provision of production messages
Njaa Marufuku Kenya-
county wide
Provision of the initial capital to
increase farm productivity and
income;
To reduce extreme poverty and
hunger in the county
Covert 70% of CBOs, and other
groups;
Appraise at least
50 suitable community driven food
security initiatives;
Fund at least 25 groups per year;
10 monitoring visits conducted per
year;
40 field school sessions conducted
per year
Convene County Grant appraisal Committee; Sensitize
communities to prepare NMK proposals.
Monitor and evaluate NMK funded projects; Train groups
on management of the funded projects;
Conduct farmer field Schools;
Water harvesting for crop
production-ASAL
To improve food security;
To Mitigate against severe drought
and water shortage.
5000 farmers trained on water
harvesting;
300 extension officers trained on
water harvesting;
Establish 250 ha of crop under water
harvesting structures.
Train extension officers on water harvesting techniques.
Farmers trained on water harvesting for crop production
Cotton production-ASAL;
Salawa, Sacho, Kimose and
Tenges
To Increase area under production
and farm incomes
25,000 ha under cotton cultivation;
Increased value addition at farm
level
Stakeholders‘ mobilization;
farmer trainings;
Acquire farm input; Introduction of Micro-ginners and oil
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 157
Project Name
Location/ Sub-county/
Constituency
Objectives Targets Description of Activities
extraction technologies
Traditional high value crops
seed development-ASAL
To Improved food security;
To increase availability of seeds of
orphaned crops locally
1,250 Acres put under beans/
cowpeas seed bulking per year;
10,000 bulking farmers trained per
year
Train Farmer;
seed acquisition and multiplication;
disseminate research findings to farmers;
Inspection of bulking plots; Harvesting ;
storage and distribution of bulked seeds
Enhance Research-Extension-
Farmer Linkages
To improve flow of research
findings to farmers for improved
agricultural productivity;
Conduct 20 on farm trials yearly;
Conduct 1 research extension
meeting per year for every Sub
County;
4 field days conducted per year for
each Sub County.
Plan and conducted trials on farmers fields/
Train Extension officers on data collection
Traditional High Value Crop.
(THVC)
To increase availability of clean
planting material;
Improve food security
15.1 tones of traditional high value
crop be retrieved from farmers
issued
Provide traditional High Value seed crops to farmers
National accelerated
agricultural input access
programme. (NAAIAP)
To Increase technical knowhow of
smallholder farmers on efficient
utilization of farm inputs to increase
agricultural productivity.
Upscale linkage of farmers and agro
dealer to available market i.e. input
and output market
Improved access of credit of agro-
input dealers and farmers.
1000 small scale farmers to receive
one acre inputs to plant maize and
capacity building on efficient
utilization of farm inputs per sub
county per year;
1000 small scale farmers linked to
available inputs and output markets;
1000 small scale farmers sensitized
on available credit and where to
access;
60 agro dealers‘ capacity building on
efficient use of farm to increase
agricultural productivity and credit
access awareness.
Supply of inputs to farmers.
Train farmers on efficient utilization of farm inputs.
Agricultural Sector To upport the transformation of -Sector wide coordination improved -Support towards Agricultural sector coordination
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 158
Project Name
Location/ Sub-county/
Constituency
Objectives Targets Description of Activities
Development Support
Programme (ASDSP)
Kenya‘s agricultural sector into an
innovative, commercially oriented,
competitive and modern industry
that will contribute to equitable
productivity, poverty reduction and
improved food security in rural and
urban Kenya
2. To Increase equitable incomes,
employment and food security of
both male and female target groups
as a result of improved production
and productivity in the rural
smallholder farm and off-farm
sectors‖.
-Environmental resilience and social
inclusion of value chain actors
improved
-Support the development and
commercialization of 3 prioritized
value chain commodities across the
County, namely: Dairy, Honey and
meat goat (Chevon)
-Capacity building of key sector institutions and
institutionalization of the ASDSP at the national and county
levels
-Strengthening linkages between sector institutions
-Support establishment of M & E and information
management systems
-Support development of an enabling policy and regulatory
framework for the sector
ENVIRONMENTAL RESILIENCE & SOCIAL
INCLUSION COMPONENT
-Support theStrengthening of environmental resilience for
value chain actors, including vulnerable groups
-Support the strengthening of conditions that enable
vulnerable groups to engage in value chain development
Prioritized Value Chain Development Component
-Supportdevelopment and commercialization of prioritized
inclusive value chain commodities
-Enhance/Increase public and private investment in
prioritized value chain development
-Increase equitable access to markets of prioritized value
chains commodities
-Improve access to affordable financial and insurance
services for prioritized value chain actors
-Support Up scaling and out scaling innovative and
inclusive prioritized value chains and value chain
technologies
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 159
11.3.1. Livestock Production
On-going projects
Project Name
Location/ Sub-county/
Constituency
Objectives Targets Description of
Activities
Tsetse Control To reduce tsetse density and
incidences of Trypanasomiasis in
livestock
Reduce fly density by 20 per cent annually;
Reduce incidence of Trypanasomiasis in livestock by 20 per
cent annually.
Carry out tsetse and Trypanasomiasis
survey;
Deploy insecticide treated targets;
Use of Synthetic Pyrethroid charged dips;
Use of traps;
Training of community Tsetse control
committees.
Clinical Services To maintain healthy state of
livestock
Treatment of all reported sick cases in livestock;Ensure
compliance of private service providers.
Carry out treatment of sick livestock;
Supervision of private service providers
To improve animal health
management and production
To hold farmer trainings: 200 Demonstrations; 55 Field days;
Attend and Participate in the annual Agricultural show.
Train farmers through demonstrations, farm
visits, field days, shows
Hides and skins
improvement and leather
development
To improve quality of hides and
skins
To train all flayers at the slaughtering points; Train traders on
handling of hides and skins;Train producers on appropriate
management practices.
Train hides and skins producers, traders and
flayers
Tick control Control and reduce tick borne
disease incidences
Desilting of 15 cattle dips per Sub County;Carry out 288
training sessions and 970 per supervisory visits;Auditing and
recommending all dips for rehabilitation
Construction of new cattle dips and
rehabilitation of existing ones;Training of
dip committees on proper dip management;
AI Services Improve the coverage/quality of
AI services in the county
Creation of 15 more AI services centres per Sub County;
Licensing and inspection of the 10 AI services each year;Carry
out 40 training sessions for farmers, inseminators and service
providers
Establish AI service centers;revival of
stalled AI services;Training of inseminators,
service providers and farmers
Licensing/inspection of all AI offices and
stores
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 160
Project Name
Location/ Sub-county/
Constituency
Objectives Targets Description of
Activities
Honey production To increase Honey productio To increase honey production to 4,135314 kgs annually Increase honey productivity per hive to 11
kgs per hive and production to over 5,000
tonnes per year,
Purchase of modern beehives
Fodder Production To improve fodder production
and improve pasture
Increase fodder production,to
To increase area under improved pastures by 30% i.e 19,531ha
Capacity building communities,
Purchase of modern bailer machines
Improving pasture through research
11.3.2. Cooperative Development
Ongoing and Proposed New projects
Project Name Objectives Targets Description of Activities
Education and Training
programme
To Enable co-operative societies to organize
and run their affairs successfully
Co-operative
members;
staff of Co-operative
societies
Source for trainers;
Prepare terms of reference for trainers;
Prepare list of trainees;
Contract institute to do the training
Co-operative awareness
meetings
To Create co-operative awareness in the
county
Co-operative
members;
potential members;
the general public
Organize for the meetings;
Source venue;
Pay for services rendered.
Accounts and Management
meetings
Bring the bookkeeping and Accounting
standards up to date
Existing co-operative
societies in the county
Organize for the meetings;
Source venue;
Pay for services rendered.
Auditing of Co-operative
societies
To comply with the legal requirements All existing co-
operative societies in
the county
Prepare schedule of societies to be audited;
Prepare audit team;
Prepare budget for the exercise.
Market Information and To enable societies and value for agro-based All co-operatives To provide services which are competitive in the market and
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 161
Project Name Objectives Targets Description of Activities
Research societies; Identify other products for
SACCO societies; To network with other
stakeholders for identification of market
outlets.
societies earn more for their products and services for self sustainability;
Especially in coffee bee-keeping, cotton sector;
Other micro-finance services in the savings and credit sector to
assist the members and local community.
Ethics and Governance
Compliance
To have all co-operative committee and staff
comply with ethics Act.
Committee and staff
of co-operation
societies
To have leadership of integrity in the co-operating movement
Promotion of Co-operative
Ventures
To enable co-operatives exploit more
economic ventures
Existing co-operative
societies and new co-
operative societies
More areas of economic ventures have not been exploited fully
by co-operative members like the Jua Kali sector, livestock
marketing.
Coffee Development Fund
Credit Activity
Avail credit facilities to coffee farmers for
improvement of volume and quality of coffee
production in the next 4 years
Coffee farmers Coffee production in the county both in quality and volume is
still below the county‘s potential
Enhance compliance on non-
remittances by employers in
saccos
To ensure that employee deductions are
remitted timely, and in correct amounts to
Saccos by employers
Employers and sacco
society members
Sensitization of employers, Sacco management committees, and
members
Fill form VIB (r 31b), file the for regularly with the employer,
Monitoring and evaluation
Registration of new Co-
operative Societies at least 2 per
sub-county
To involve as many people as possible in Co-
operatives
youth and women and
county wide Saccos
Fill application for registration forms,
Prepare By-Laws,
Prepared economic appraisals and business plans
Submit the documents to the commissioner for Co-operative
Development for registration
Monitoring and evaluation
Revival of dormant Co-
operative Societies at least 2 per
sub county
To streamline governance in co-operatives
where members had lost faith in them
Members, youth,
women, and the
public
Organize for meetings with stakeholders, Identify venues,
Source for funds, Carry out revival meetings
Monitoring and evaluation
Capacity built for value addition
in the following value Chains
Dairy,honey, red meat, coffee,
To add value to products, ensure better
quality, access to local and regional markets,
and more incomes to co-operators
All 82active
marketing Co-
operative Societies
Indentify Co-operative Societies due for value addition,
Train management committee members, staff, source for funds,
Source for technical expertise for value addition,
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 162
Project Name Objectives Targets Description of Activities
cotton, horticulture,sacco
products, aloe
vera,fish,groundnuts
Minimize exploitation by middlemen and active Saccos
with emphasis on
women and youth
Procure plant, equipment and tools, install
Embark on value addition
Monitoring and evaluation
Provide information on sourcing
of farm inputs in bulk through
Kenya Farmers Co-operative
union Ltd. (KFCU)
To avail to farmers affordable inputs on time Co-operative
Societies‘ members
Co-operative Societies to list members inputs requirement,
Forward the requisition to, KFCU, Pay for inputs and receive
deliveries for onward distribution to members
monitoring and evaluation
Stalled projects
Project Name
Objectives Description of Activities
Co-oparative Trainings Education and training for Co-operative
Societies
Sourcing for fund for training, Identify training needs, Identify
trainers, carry out training
Capacity building for Coffee sector Continuation of implementation of Quality Coffee Production and
Commercialization Programme (QCPCP)
Revival of Cotton Co-operatives A survey was carried by Ministry of Co-operative Development and
Marketing HQs in November 2012
Audit fast tracking programme List of Societies having audit in areas, auditors to carry out Audit,
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 163
11.3.3. ProposedActivities (MTP Consultations) under agriculture sector
The MTP consultation process identified the following key priority areas, issues and
proposed interventions
Key Priority Areas
Agriculture productivity / Food Security; Promoting Market Access and Product
Development;
Enhancing Accessibility to Affordable farm inputs and credit; Promoting Sustainable Land
Use and Environmental Conservation; Enhancing Institutional Efficiency and Effectiveness
in Implementation and Improving Service Delivery
Key Issues
The County is food deficit; Poor farming Methods; Unpredictable weather resulting to
droughts;
Low productivity and low production acreages; High pre and post harvest commodity losses
due to Pests and diseases infestations ;Low adoption of appropriate technologies such as
high-yielding crop varieties and inadequate application of fertilizer due to High cost of the
farm inputs;Low adoption of emerging technologies ; Inadequate value addition (processing)
resulting toLow market prices and low marketability of products;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 164
Proposed Activities Indicators Outcomes
Proposed Interventions (Short Term)
Diversifying cropping base to crops like
Macadamia, coffee, ground nuts, aloe and
cotton;
Promoting drought tolerant crop
varieties;(Development and multiplication of
seeds);
Improving drought cycle management;
Training of farmers on low cost water
harvesting technologies and water application
systems(drip irrigation);Rehabilitating existing
irrigation infrastructure
Create market links for produce and products
from processing industries
Cross breed crops and livestock
Community sensitization on benefits of fish
farming
Proposed Interventions (Long Term)
Investing on the expansion of irrigation
infrastructures; Constructing multi-purpose
dams;
Develop and implement better post harvest
storage techniques;Promote large-scale
farming; Provide farm input subsidies;
Establish research centres;Establish disease
free zones for livestock
Number of modern post-harvest storage facilities;
Number of marketing Associations;
Number of new farming and land management
technologies introduced per year;
Number of farm extension officers and their ratio to the
number of farmers;
Acreage of land put under irrigated agriculture each
year;
Acreage of land under agro-forestry activities;
Number of acreage under irrigation;
% of food secure households;
Number of fish ponds constructed;
Number of modern farming methods established each
year
Number of fruits and vegetable extraction factories
established
Number of updated reports on market links each year
Amounts of input subsidies provided to farmers
Number of resistant livestock breeds introduced each
year
Number of sensitization sessions to farmers on the
importance of fish farming
Acreage of land under the cash crops;Volume of
production of cash crops;
Establish one Abattoir for beef Marigat;
Acreage of land under irrigation;
Amount of value added output from farm produce;
Tonnes of honey produced and sold;
Tonnes of meat, beef, mutton, wool and fat lamp
produced
Reduced post-harvest output storage losses;
Increased marketing links and turn-over
Optimum farming and land management techniques
Faster adoption of new farming technologies;
Increased acreage of land put under irrigated agriculture;
Increased agro-forestry activities;
Increased acreage under irrigation
Food secure households;
Increased fish production;
Modern farming methods adopted by farmers;
More market returns for farm inputs;
More market returns and high turnover of market produce;
Improved livestock breeds thus more productivity;
More farmers adopting fish farming;
Acreage of land under the cash crops;
Increased employment;
More land under irrigation;
Increased market returns;
Increase in Apiculture economic activities;
Increased returns from meat, beef, mutton, wool and fat lamp
produced;
Faster response to reported diseases;
Reduced livestock diseases;
Increased productivity from livestock;
Insurance schemes established;
Number of disease free zones established;
Increased water access ;
Acreage of land under grape fruit farming;
Increased employment activities;
Increased farm produce returns;
Easy access to seedlings
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 165
11.3.4. New Projects (CIDP Sub county Consultations)
The consultative process for the development of the CIDP identified the following projects and programmes
Project Name Objectives Targets Description of Activities
.Establishment of
the Credit
Development Fund
Easy access to affordable credit facilities
Small and medium enterprises, saccos, farmer
groups across the County
At least one entity per Ward Link entities to Credit Development Fund
Capacity building of beneficiary groups
100 million for fund to borrowed at 5% interest rate5
million for operations
Livestock
Upgrading Program
Improving quality, quantity and income from
livestock farming.
Milk production up by 50%, beef production up 50% ,
diversification of livestock products
-capacity building of farmers/ extension
-Provision of AI services
-Introduction of improved breeds
-Pasture and fodder development and conservation
-Provision of credit facilities
-Electronic branding of livestock.
-Up scaling and Set up of livestock multiplication centres
at strategic points across the County
- Water development for livestock use
Establishment of Bull Stations in strategic areas of the
county county like Kaptigit and Barwesa
Establishment of livestock improvement centres for
enforcing a disease free zones
Establishment of the Embryo Transfer Facility at Kabimoi
FTC
Establishment of goat improvement and breeding centres at
Chemogoch, Kimose and Mogotio
Cattle branding for
livestock
identification.
For easy of identification All cattle county wide Branding of cattle across the county
Fish feed
formulation at
Emining.
Promotion of fish farming value chain
development.
Construct a house and install a fish pelletizer machine at
Emining
- setting up pelletizer machine
- Capacity building
Construction/rehabil
itation of 90 cattle
dips.
Improving livestock health and disease
control.
90 cattle dips Repairs, Design, Construction, Equipping, Acaricide
provision, Staffing, operationalizing
BeeKeeping/Farmin Diversification of economic farming 30,000 beehives in the county -capacity building and standards training
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 166
Project Name Objectives Targets Description of Activities
g -provision of credit for bee hives and procession equipment
- Value addition and Branding of Honey
Irrigation Improved food security and employment
creation
5,000ha of land under irrigation in Baringo South, Tiati,
Baringo Central, Mogotio, Baringo North
Design, Construction, Capacity Building, Farm machines
purchase,
Provision of farm
inputs
Affordable access to farm inputs. One seed distribution depot per sub county -legal framework
-provide seed capital
-Credit provision to farmers
-Setting up seed storage depots
Coffee milling plant To promote branding of Baringo coffee,
wealth and employment creation
Put up a coffee milling plant and establishment of coffee
shops in Baringo North / central
raise acreage from the current 816 ha to 2,000 ha by
2018
Encourage PPP investment in coffee milling with local
shareholding.
Capacity building of farmers
Promote establishment of coffee nurseries for high yielding
varieties
Ground nuts
production and
processing
Increased wealth and employment creation
Improved household livelihoods
Promote increased production from 1,020 ha to 3,000 ha
in 5 years in Cheplembus, Kapkelelwa, Salawa,
Barwesa, Kinyach, Marigat, Kimalel/ Koriema, Sabor,
Emining, Kisanana, Mogotio, Kimngorom / Cheberen,
Kolowa, Chesirimion and Maji Moto
Reach 15,000 ground nuts farmers
Purchase ground nuts processing machines
Capacity building of staff and farmers
Conduct Demonstrations on production and processing
Enhance marketing linkages
.Macadamia nuts
production and
processing
-Establish a flourishing macadamia nuts
industry in the County
-Diversify household income sources
-Increase production, productivity and value
addition of macadamia nuts
-Enhance opportunities for wealth and
employment
-Establish a macadamia nursery
-Provide macadamia nuts value addition machines
-Capacity building of staff and farmer growers
- Raise acreage from the current 152 ha to 1,000 ha by
2018
-Set up a macadamia nuts nursery at Tenges
-Increase grafted macadamia nuts seedlings
-Establish a macadamia nuts processing machine at
Kabarnet
-Build capacity of staff and farmers to manage the
macadamia industry to prosperity
Cotton Ginnery
complex
Increased wealth and employment creation
Improved household livelihoods
Increase acreage to 25,000 ha by 2017
Capacity building of staff and farmers
Encourage PPP investment in establishing a cotton ginning
complex
Promotion of the
Cooperative
movement
Driving the economy using the Cooperatives 5 sectoral cooperatives in the County -Facilitate establishment of specialized Cooperatives
-Facilitate the revival of stalled cooperatives
-Enhanced legislation to guide cooperatives
-provision of Credit for capitalising Cooperatives
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 167
Project Name Objectives Targets Description of Activities
Construction of
Livestock Sales
Yards
To promote market access for livestock
products
19 Sites: Marigat, Kolowa, Salawa, Kinyach, Kaptara,
Kasitet, Amaya, Tangulbei, Kapcholoi, Emining,
Kibotany, Kabel, Tugumoi, Loruk, Maji Moto,
Kimoriot, Kapindazim, Kasitet, Kipsaraman, Kiserian,
Loitip, Barwessa, Nginyang, Chemogoch, Kipcherere
Securing Public LandConstruction/Rehabilitation of Sales
Yards
Establishing livestock Registry
Construction of
international
slaughter houses.
Barwesa, Loruk, Mumberes 3 International slaughter houses Construction of slaughter houses under PPP framework
Construction of biogas plants
Construction and
Rehabilitation of
slaughter houses
Countywide (at least 1 in every ward) 46 slaughter houses Carry out rehabilitation works
Range reseeding and
development
Increase livestock feed availability All ASAL areas in the County Capacity building
Range reseeding
Promotion of sisal
production
-Establish a flourishing sisal industry in the
County
--Increase production, productivity and value
addition of sisal
-Enhance opportunities for wealth and
employment
-Raise acreage from the current 400 ha to 1,000 ha by
2018
- Target areas include Kapkechui, Simotwe, Oterit and
Molosirwe locations as well as Chemogoch sub location
- Capacity building of farmers on modern sisal production
technologies.
- Formation of a sisal farmers society
- Procurement of a mobile sisal decorticating machine
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 168
11.3.5. Strategies to Mainstream Cross-cutting Issues
Gender issues will be addressed in all the sub-sectors by ensuring that the gender
balance is observed and both men and women are given equal opportunity. There will
be emphasis to achieve the 30 per cent women representation in all trainings and
activities, including the committees charged with different responsibilities under the
devolved funds as well as appointive positions.
The HIV and AIDS affect all the sub sectors negatively especially the agriculture
where the productive age is mostly affected and efforts will be made to mainstream
HIV and AIDS in the sector activities. The projects proposed in this CDP have also
taken into account the environment and climate issues. They will also be implemented
in a sustainable manner with appropriate environmental impact assessment being done
to minimize any negative impact.
ICT will play an important role in this sector in provision of agricultural information
to farmers. The use of technologies such as M-SHAMBA, a mobile-phone enabled
technology which will help farmers to link up with crop researchers, meteorological
departments and veterinary scientists to improve their farms yields will be explored
and be fully exploited in the county.
11.4. Education Sector
The Education Sector comprises of Ministry of Education (MOE); Ministry of Higher
Education, Science and Technology (MoHEST); the Teachers Service Commission (TSC)
and their affiliated Institutions.
Vision
A globally competitive education training, research and innovation for sustainable
development.
Mission
To provide, promote and coordinate quality education and training, integration of
science, technology and innovation in sustainable socio-economic development
process.
County Response to Sector Vision and Mission
To achieve the sector vision and mission, education and training will focus on
community involvement and participation in education programmes. Promotion of
Girl Child Education (GCE) and Early Childhood Development (ECD) programmes
will be a priority in the county. Improvement of education facilities through increase
in bursary and community contribution, promotion of a sustainable school feeding
programme will also be a priority in the county. Mobile schools and boarding schools
for pastoral communities will also be a priority. There will also be rehabilitation and
equipping of youth polytechnics as centers of specialization. The county will also
prioritize equipping of secondary schools with IT and Laboratory facilities.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 169
Role of the Staakeholders
Stakeholder Role
Community Participate in M & E activities
National Government Ensure formulation and Implementation of
policies and to provide funds
Quality Assurance Standards
County Government Provide land for physical infrastructure
Provide funds for development
CBOs/NGOs/Donors Provision of physical facilities and bursaries to
bright but needy children.
Train community on the rights of children.
Private Sector Complement Provision of education services and
support programmes at all levels.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 170
Ongoing projects: Education
Flagship projects: Education
Project Name Objectives Targets Description of Activities. Responsible agency Implementation status
Centre‘s of excellence To increase the number of
classrooms and improve
infrastructural facilities to create
conducive environment for
learners
10 secondary schools
10 primary schools
Renovation & construction of
dining hall, laboratory,
classrooms and
administrations blocks in the
schools.
MOE On going
Computerization of Sec. Schools Improve performance through e-
learning
30 secondary schools Purchase of computers,
projectors and installation of
internet.
MOE Ongoing
11.4.1. New project proposals
Project Name Priority Ranking Objectives Targets Description of activities
Refurbishment of ECDE Centres in
primary schools within Baringo County
1 Enhance access to ECD
education to all children in
Baringo County
360 ECD Classrooms -Construction of 3 classrooms per school
-Equipping
-Employment of 3 ECD teachers per primary school.
- Renovation as appropriate
Construction of 4 new ECD Centres per
sub county
2 Enhance access to ECD
education to all children in
Baringo County
24 ECD Classrooms Design, Construction, Equipping of classrooms and
Recruitment of Teachers
Construction of 3 new youth
polytechnics at Tiati, Baringo North and
Baringo South and rehabilitation of 12
existing polytechnics
3 Enhance access to
technical/vocational education
to all youth in Baringo County
3 new youth Polytechnics
15 adequately refurbished
and equipped polytechnics
Design, Construction, Equipping of workshops and
Recruitment of Tutors
Establishment of one Integrated Special
school per sub county/Constituency
5 Enhancement of integrated
access to education by Children
with disability
6 Integrated schools Design, Construction /Completion, Equipping and
operationalization of 6 Integrated schools.
Setting up a County Bursary,
Scholarship and Startup Fund for Post
Secondary Education
6 Increase access to education by
all needy and deserving
children in Baringo County.
Resource Mobilisation, Set up Legal Framework,
Establishment of Secretariat and Operationalisation of
program.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 171
Project Name Priority Ranking Objectives Targets Description of activities
Construction of all incomplete schools
as reflected in Annex of projects.
9 Enhance access , retention and
transition to Secondary
education to all children in
Baringo County
Incomplete schools Resource Mobilisation,Design, Construction, Equipping
Establishment/Construction of Baringo
ECDE college
10 Enhancement of quality training
of all new ECDE teachers in
Baringo
One ECDE college. Resource mobilisation , Design, Construction , Equipping,
operationalising.
Establishment of one adult
education/home craft centre per
location in Baringo County.
11 Enhancement of Access to
Adult Education In Baringo
County
90 Adult Education Centres Resource mobilization , Design, Construction , Equipping,
operationalising
Proposed Secondary Schools
S/NO SCHOOL AREA OF DISABILITY LEVEL SUB-COUNTY
1 Marigat Day Visually impaired [mixed] Secondary Marigat
2 Esageri Hearing impaired [mixed] Secondary Mogotio
3 Kabarnet deaf/blind All categories Primary Baringo Central
4 St. Patricks Shimoni Physically handicapped Secondary Koibatek
Proposed Programmes [Primary]
S/NO SCHOOL AREA OF DISABILITY LEVEL SUB-COUNTY
1 Pemwai Mentally handicapped Primary Baringo central
2 ochii Hearing impaired Primary Baringo central
3 Chemolingot All disabilities Primary East Pokot
4 Moi Kabartonjo Visually impaired Primary Baringo North
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 172
11.4.2. Proposed Programmes
Project Name:
Division/Location/
Constituency
Objectives Targets Description of Activities
Improvement in enrollment,
retention and transition rate
County Wide
To make a deliberate move to ensure
education is achievable to all through day
schools and low cost boarding schools
Improve the present
enrolment retention rate to
98% and improve transition
rate by 70% at all levels
Promote school feeding programmes;
Build more day secondary school and low cost boarding
primary schools.
Establish nomadic boarding primary schools in Tiaty
Dropout rate reduction programmes
County Wide
The school dropout should be contained
and improve transition and completion
rate at all levels
Reduce all drop-out rates by
100% by 2017
Strengthen guiding and counseling in schools;
Charge reasonable fees especially for schools that were
already well established;
Provide bursaries;
Equip schools with required learning material;
Enhance assessment in schools.
Construction of early childhood
development centres classrooms
County Wide
Enhanced enrolment in ECDC Construct 360 classrooms by
2015
Sensitization of school communities;
Mobilization of resources;
Construction of classrooms in primary schools.
Construction of Libraries in
selected schools
County Wide
Improve hygiene and academic
performance in schools.
Construct libraries in 10
secondary schools and 5
primary schools
Sensitization of school communities on the importance
of libraries;
Mobilization of resources
Construction and equipping.
Monitoring and Evaluation to
improve quality in schools,
polytechnics and other tertiary
institutions
Ensure quality training in the institutions Monitoring of 100% of all
institutions at least once per
year
Introduction of performance contracting
Guidance and Counselling To ensure psychosocial support and
proper adjustment of pupils, students and
staff
100% Coverage at all
institutions
Strengthening of existing guidance and counseling units
and establishment of new ones where none exist
Provision of training and capacity building for
counselors
Auditing of Schools To ensure accountability, transparency At least once per year in Auditing of schools
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 173
and prudence in the use of public
resources
every institution
ECD Capacity Development
Programme
To establish adequate capacity to provide
ECD services to the people
1 ECD Training Centre
360 ECD Teachers
Establishment of 1 ECD Training Centre
Recruitment and Training of ECD Teachers
Post Secondary Capacity
Development Programme
To develop the capacity of instructors
/teachers on ICT, life skills, guidance and
counseling, entrepreneurship , and
disaster management
50 instructors
1500 teachers
Preparation of Training Materials
Training of Instructors and Teachers
Exchange and Benchmarking
Programme
To facilitate the exchange of ideas and
transfer of best practices
5 in county, 5 national and 3
International Exchange
Programmes
Visiting other institutions within and outside the county
and country
Hosting and sending students and instructors in exchange
programmes
Career Fair To guide and mentor the youth in making
career choices
3 per year Inviting Mentors
Hosting the fair
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 174
11.4.3. Strategies to mainstream cross-cutting issues
There will be concerted efforts to address the girl child problems to improve girl‘s enrolment
and completion rates. The participation of women in strategic committees like the devolved
Fund will ensure the plight of girl child is addressed. The introduction of free primary
education and subsidized secondary education has seen rise in enrolment rate.
11.5. Energy Infrastructure and ICT Sector
The Energy, Infrastructure and Information Communications Technology Sector consist
of Energy; Roads; Public Works; Transport; Local Government; Nairobi Metropolitan
Development and Information and Communications Technology Subsectors.
Vision
A World class provider of cost-effective physical and ICT infrastructure facilities and
services.
Mission
To provide efficient, affordable and reliable infrastructure for sustainable economic
growth and development through construction, modernization, rehabilitation and
effective management of all infrastructure facilities.
County Response to Sector Vision and Mission
Poor physical infrastructure has been identified as a major setback in development in
the county and hence the overall strategy is to provide physical infrastructural facilities
through rehabilitation, improvement and effective management and expansion of the
existing facilities. The road network will be maintained and improved through
gravelling, grading and upgrading to bitumen standard. Power and telephone services,
will be expanded to cover all the Sub-Counties targeting market centers, institutions
and main community projects.
Role of Stakeholders Stakeholder Role
Government
Departments
Provision of funds for maintenance of roads;
Solicit for funds from donors for road works;
Maintenance of classified roads to all weather roads;
Ensure that construction works in the county are of good quality, provide plans and
supervision for public projects;
Telkom
Kenya/Safaricom/Ai
rtel/Yu
Maintain the existing fixed telephone lines and extend telephone services to new consumers
Energy Sub Sector
The Sub-sector is responsible for transport policy formulation and development of regulatory
framework and transport infrastructure
Local Government
Sub Sector
The ministry‘s main focus is to ensure Operationalization of policy, institutional and legal
framework within the local Authorities to enhance service delivery .
Housing Sub-Sector facilitates development and management of quality and affordable housing for Kenyans
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 175
11.5.1. Projects and Programme Priorities
On- going Project/Programmes: Roads
Project Name
Objectives Agent Description of activities
Loruk-Chemolingot-Barpelo Improve access and ease transport KENHA Upgrading to Bitumen
Churo-Tangulbei-Loruk International Linkage LAPPSET Highway
Mogotio-Mugurin-Emsos-Lake Bogoria Hot
Springs
To ease and improve road transport. KERRA Graveling
Ravine –Eldoret Road Improve accessibility. KENHA Potholes patching
Eldoret-Iten-Kabarnet-Marigat To ease and improve road transport. KENHA Potholes patching AND Bush Clearing
Marigat - Loruk Improve access to rural areas. KENHA Bush Clearing and Drainage Works
Church Road Improve rural accessibility. KUDD Street Lights, Drainage Works and Paving
To ease and improve road transport. Gabion Installation
Society-Saos-Cheberen-Tenges-Kapsoo-Kasoiyo Improve access to rural areas. KERRA Repatching and Drainage Works
New Projects (MTP 2 Consultations)
The MTP consultations identified the following key issues and proposed the interventions below
Key Issue Proposed interventions
Indicators Outcomes
Poor transport, communications
and energy infrastructure;
Inaccessibility of most areas due
tom poor roads;
Low incomes from farming due
to poor for input accessibility and
output deliveries
Increase the matching grant approach to
electricity with the Rural Electrification
Authority (REA);
Increase the length of all-weather roads
Initiate alternative sources of energy such as
biogas, solar and wind energy sources;
Length of road tarmacked and murramed;
Percentage of households with access to
electricity;
Number of alternative sources of energy
initiated and sustained;
Amount of funds set aside by donors and
implementers as matching grants for
Improved roads accessibility;
Improved access to electricity
connections;
Enhanced alternative sources of
energy initiated and sustained;
Less destructions of forests for wood
fuel
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 176
Key Issue Proposed interventions
Indicators Outcomes
Increase the length of tarmacked roads electricity connections
Untapped natural resources;
water, solar, wind, geothermal,
minerals (diadomite, Ruby, sand,
hardcore, bushstones
Undertake feasibility studies to ascertain
economic value of identified resources
Exploit water falls for electricity generation;
Tap geothermal energy at Silale
An electricity generation project initiated;
Amount of minerals mined;
Value of minerals mined;
One geothermal energy project established
at Silale
Improved electricity access by
residents;
Enhanced economic diversification
Proposed Projects (CIDP Consultations)
Project Name Objectives Target Description of activities
Improvement of Urban Roads Improve quality of life in urban areas 50 km Design and construct urban roads
Acquisition of Construction
Equipment
Reduce the cost of infrastructure development Dozers, excavators
graders and others
Acquisition of Equipment
Development of utilization schedule and rules
Recruitment and training of technical staff
Mapping and maintenance of
transport information
Improve collection and preservation of road
information including road reserves
All Infrastructure Acquisition of mapping equipment
Recruitment and training of technical staff
Capacity Development on
Road Construction
To empower members of the community to
participate in road construction and maintenance
All Wards Training of members of the community on labour based
road construction methods
Development of County
Transport Policy
To provide a conducive environment for the
development of the local transport sector
Development of policy on road reserves, traffic
management, motorised transport (matatu, tuktuk, boda-
boda) and non-motorized transport (bikes, footpaths) and
street lighting
Development of Transport
Terminus in different urban
areas
To provide adequate facilities for transport operators
to offer their services and for the county to obtain
revenue
All Towns Development of Matatu Termini
Development of Railway
Linkage between the southern
corridor and LAPPSET
To improve connectivity within the region Nakuru-Nginyang Resource Mobilization
Design and Construction
Maintenance and Development
of Aviation Facilities
To improve air transport All airstrips in the
county
Fencing and securing
Repairs and construction of runways and Equiping
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 177
Project Name Objectives Target Description of activities
ICT
Optic Fibre Connectivity To enable connectivity and knowledge sharing Connectivity at every
subcounty
Work with partners to connect optic fibre to all sub-
county offices, schools, health centres and ICT centres
Establishment of the County
Data Centre
To enable delivery of public services through ICT 1 data centre Identification, procurement and/or Refurbishment of
Premises
Acquisition of Equipment
Capacity Development
Provision of WIFI
Connectivity
To enable connectivity and knowledge sharing WIFI coverage in every
urban area
Identification of Partners
Facilitation of the process
Establishment of E-
government Services
To realize an efficient and effective delivery of
services in all departments to the public
Number of services
available
Availability of county
paybill number
Needs Assessment
Systems Development and Deployment
Capacity Development
Enable payment of public services through mobile
money services
Establishment of ICT Centres
& Incubation Centres
To provide a conducive environment for ICT
businesses to thrive
Identification, procurement and/or refurbishment of
premises
Promotion and support for
locally developed ICT
solutions
To encourage the development of the local ICT
industry
1 incubator per
subcounty
Organize exhibitions to showcase local ICT products
Procurement of local ICT solutions
ENERGY
Accelerate Rural
Electrification
To increase the penetration of the electricity grid All Wards fast track implementation of the rural electrification
master plan to connect all public facilities by 2015.
Eliminate use of kerosene for
lighting
To promote clean lighting, preserve household
income, reduce indoor air pollution, and improve
education among the households of Baringo
All Wards Develop a household energy policy
Support penetration of solar lighting
Support the development of an
improved cookstove industry
To develop the household energy sector as a
strategic competency in Baringo County
Capture at least 30% of
the national household
and institutional
cooking fuel and stove
market
Forge partnerships for technology transfer
Encourage local manufacture of improved cookstoves
for distribution countrywide
Encourage development of pellets and briquetting
industry using invasive species
Support the development of To develop the use of alternative fuels 100 biogas technicians Training of biogas masons
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 178
Project Name Objectives Target Description of activities
biogas among farmers and
slaughterhouses
trained Educating farmers on the technology
Construction of biogas plants at all slaughter houses
Increase use of renewable
energy e.g. solar and energy
saving devices (e.g. bulbs) in
public facilities
To promote the use of renewable energy All Public Institutions Replacement of inefficient bulbs with energy saving
bulbs
Use of solar in street lighting, water pumping and remote
facilities where practical
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 179
Proposed Roads Projects
Figure 18 below shows the roads that will need to be constructed / upgraded within the
county. The legend explains the classification. The county prioritized will be constructed
based on the construction. More details will be included in this map when the transport sector
plan has been prepared.
Figure 22: County Flagship, Geothermal and Security Roads
11.5.2. Strategies to Mainstream Cross-cutting Issues
Care will be taken to minimize degradation of the environment while constructing physical
infrastructure. Before implementation, projects/programme will be subjected to EMCA of
submitting Environmental audits. The county will address issues of HIV/AIDS by requiring
all actors to sensitise their workers on prevention and care.
In the process of developing and maintaining the necessary infrastructure, the county will
take due cognizance of the MDGs.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 180
11.6. Environmental Protection Water and Housing Sector
The sector comprises of the following sub-sectors: Environment, water and irrigation and
housing and related research and development.
Vision
Ensure a clean and secure environment, sustainably managed mineral resources,
irrigation development, access to clean and affordable water and sanitation for all.
Mission
To promote conservation and protection of the environment, in order to support
exploitation of mineral resources, integrated water resource management for enhanced
water availability and accessibility as well as quality sanitation for national
development.
County Response to Sector Vision and Mission
In the medium term, the residents will be able to access safe drinking water within a
reasonable distance, while the sanitation facilities like sewerage will be constructed to
cover the major market centre while encouraging the construction of residential areas
outside the main town.
Role of Stakeholders in the Sector
Stakeholders Role
Government
departments
Provision of funds
Solicit for funds from donors
Supervision for public projects
Water board Maintain and operate major water projects, and extend water to new consumers.
County
Government
Provision of funds
Undertaking physical planning to ease the establishment of facilities
Formulation of bylaws for sustainable and safe use of the facilities
Local community Provision of required labour in the project areas
Provision of security to road furniture by avoiding vandalism
NEMA Coordinating environment management issues, promoting the integration of environment
concerns into development plans, monitoring and evaluating activities that have an impact
on the environment
NGOs/CBOs Facilitating the implementation of water, agriculture and environmental activities in their of
jurisdiction
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 181
11.6.1. Project and Programme Priorities
Flagship Projects
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Chemususu Dam Inadequate water services in
E/Ravine town and its
environs
Construction of Dam is ongoing.
Plan and design treatment works and
distribution mains
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
To serve over 15,000 HHs
Ground Catchment Rainwater
Harvesting structures
Runoff causing flooding in
the downstream areas
Investigate, plan, design and construct
a series of ground catchments to
conserve runoff from Kelelwa to
Loboi and create economic usage
Residents downstream each structure benefit from the
conserved water
11.6.2. New Proposals (MTP Consultations)
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Construction of Water
Supplies (Rehabilitation and
Expansion)
Inadequate water services caused by
dilapidated infrastructure
Carry out rehabilitation and expansion of
existing water supplies including metering
Improve water services of existing water supplies
Ground Water
DevelopmentProgramme
(Baringo County wide
Project)
Inadequate water services coverage.
Enhance drought resilience in worst
affected areas
Site, drill and equip at least 60 boreholes
during the plan period
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Over 5,000 HHs covered in the plan period
Pan/Small Dam
Construction (Baringo
County wide Project)
Inadequate water services coverage
for livestock. Enhance drought
resilience in worst affected areas
Investigate, Plan, Design and Construct at
least 60 water pans and 20 small dams
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Over 36,000 Livestock and 2,000 HHs covered in the
plan period
Rain water Harvesting Provide water to institutions to Construct/Procure water harvesting facilities Provide access to water and sanitation to 350
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 182
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
(Roof Catchment to
Institution)
improve learning conditions in the
County
institutions
Expanded National
Irrigation Programme
Develop Irrigation infrastructure in
line with National Irrigation Policy
Investigate, Plan, design and construct
irrigation facilities
Increase area under irrigation to improve resilience
through development of 20 schemes (6,400 Ha)
Baringo Irrigation
Development Programme
Identify new potential and develop Feasibility studies, Plan, design and construct
new schemes
Irrigated 1,000 Ha of agricultural potential
Establishment of a county
water provision facility
Inadequate water delivery services Establish a water company to supply water
within the county
Improved water governance and support infrastructure
rehabilitation
Development of Sanitation
and Sewerage Facilities
To improve sanitation in the county Establish sanitation facilities in all urban and
rural areas
Reduced water borne diseases, clean environment
Kapcheluguny Flood Water
Harvesting
Develop model drip irrigation
infrastructure to utilize flood water
harvesting
Design, construct/expand Kapcheluguny pans
to serve community greenhouses
Irrigate 25 acres using drip system
Kirandich Dam Phase 2 Inadequate pipe supply system and
coverage to match the dam capacity
Replace the current pipe system in Kabarnet
Town. Construct pipelines, tanks and pump
stations to cover the area between Kabartonjo
and Timboiywo.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
30,000 HHs will be reached by 2017
Kabarnet Town Sewerage
Plant
Lack of wastewater disposal system
in the town
Construct sewer lines and Treatment Works Increase access to sanitation in urban areas.
10,000 HHs will be connected to sewer system
Ndabibi water supply Dialpitated and inadequate
infrastructure
Improve and expand existing to cover more
HHs and improve service delivery
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
80 HHs and their livestock served by 2015
Kollowa Water Supply Poor access to piped water Improve and expand existing system to cover
more consumers
Improved access to safe drinking water in the market
centre
Kimao/Koriema-Patkawanin Make use of the completed Kimao
dam to serve intended purpose
Construct full treatment works and pump
station.
Construct 150m3 tank, rising main and
distribution lines.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
120 HHs to be served
Perkerra Water Project,
Ravine Division
Poor access to piped water Construction of 1No. 250m3 masonry tank,
gravity mains and distribution mains to cover
Toniok, Kipkoriony and Samutek villages.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 183
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Increase the water coverage to the consumers.
Kabartonjo Water Supply Old pipelines that require upgrading/
expansion, No sewerage system
Expansion/Extension of service lines, Survey
& design sewerage system
Increase water coverage by serving 2000 additional
people & improve sanitation
Increase water storage and harvesting capacity
SDA-Oro Bh Water Supply Inadequate piping system Extension/Expansion of service lines to reach
more HHs
Increase water coverage to Chemeril and its environs
Radat water supply Inadequate water services and
coverage
Improve the intake arrangement, construct
additional tanks and distribution system
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Improve access to safe water in rural areas;
Increase water storage and harvesting capacity
Serve 1200 people and livestock
Kaimoi Water project
Ravine Division
Limited access to piped water Construct intake. Lay gravity mains
distribution pipelines and construct
2no.100m3 Masonry tank.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase water coverage to over 3,000 people
Sacho Soi Water Project
Sacho Division
Slow pace of implementation due to
low funding levels
Construct 250 m3 tank, complete gravity
main and distribution pipelines
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
400 HHs will be served by 2016
Tirngwongwonin water
project
Inadequate water services coverage Laying of main and distribution lines.
Construction of 150m3masonry tank.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
2,500 people will be served
Tot-Kolowa Irrigation
project
Kolowa division
Ongoing (Redcross) Gravity water supply from Embobut river to
serve Marakwet and Pokot
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
200 acres will be under irrigation by 2015.
Yeptos Good water source with insufficient
service lines
Extension of pipelines Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 184
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Increase water coverage to serve 2,500 people
Cheberen water supply Improve existing scheme to serve
more people
Rehabilitate and extend the existing water
services
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
1,200 people and livestock
Chesirimion dam
Mondi division
Ongoing (Redcross) Multipurpose dam – for human livestock and
irrigation water demand
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
500 acres under irrigation each from Marakwet and
Pokot by 2015
Mumberes Water Supply
Project
Ongoing Construction of water supply: rising main,
tanks and distribution system
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
3000 HHs to be served
Kabindaram Water Project Ongoing Construction of intake, laying of gravity and
distribution mains and tanks
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
4000 HHs to be served
Chemorongion borehole Inadequate coverage Extension of distribution lines.
Construction of two number water kiosks.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
1500 people to be served
Endao-Loberer/Kampi Ya
samaki
Investigate, site and drill 3 boreholes to
augment existing boreholes Costruct
150m3 masonry tanks and facilities
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
To serve more than 5,000 people
Kapchepkor Silted Weir – source, insufficient
water source
Intake de-silting/rehabilitation, alternative
source
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase water coverage to serve 1,500 people
Ngenyilel water project
Mochongoi Division
Insufficient water coverage due to
low funding
Construct pump house; install pumpset,
rising main and distribution.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 185
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Construct 150m3 tank. Increase water storage and harvesting capacity;
Serve 2,500 people and livestock
Tirimionin Insufficient water coverage Embo-Ruto rising main
Hooking of power & Electric pump-set
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase water coverage to serve 1,000 people
Ol-Arabal/Chelaba Utilize existing water scheme Rehabilitation and extension of distribution
and rising mains.
Rehabilitation of three number masonry
tanks.
Hooking electricity mains to Kiserian and
chelaba pumping stations.
Improve access to safe water in rural areas.
Increase access to sanitation in rural areas.
Increase water storage and harvesting capacity
12,300 people will be served adequately
Bartolimo Insufficient pipelines Pipeline extensions Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase water coverage to serve 1,600 people
Desilting of water pans
Baringo County
Diminishing access for livestock
watering facilities due to siltation
Desilt at least 2 water pans per year in each
of the 6 sub-counties
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increased access to human and livestock water by
2017.
Rehabilitation of boreholes
Baringo County
Ensure all boreholes are working to
increase drought resilience
Rehabilitate/improve and expand at leased 10
boreholes per year in the County
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increased access to safe water by 20per centper cent in
2015.
Kipcherere Good water source with insufficient
service lines
Extension of pipelines Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase water coverage to serve 2,500 people
Kapkong Water Supply,
Sacho Division
Dilapidated infrastructure Rehabilitate 2 No. leaking tanks; construct
sedimentation and coagulation basins,
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 186
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Replace 6 No. High Head pump sets and
general refurbishment of structures
Increase water storage and harvesting capacity;
Increase the amount of water reaching the consumers.
Seretunin Water Supply
Kabarnet Division
Limited access to piped water Construct silt trap and 2nd intake. Lay
additional distribution pipelines
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase/activate the number of consumer connections
from the current 140 to 300 by 2017
Mochongoi Water supply
Ravine Division
Limited access to piped water Construction of 1No. 100m3 masonry tank,
rising mains and distribution network to
cover 6km.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
The project requires to supply 100 HHs.
Oinoptich Water Supply
Esageri Division
Poor accessibility to piped water Replacing of 1"Ø to 2"Ø G.I.gravity mains
and construct 100 m3 tank and lay
distribution pipelines
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase access to supply to 150 HHs
Kemtilil Water Supply
Ravine Division
Low water yield Moving the intake upstream 7km to increase
yield requirements more 6"Ø pipes and new
intake construction.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Increase access to piped water
Kiplombe Kaplesir Water
Supply
Esageri Division
Poor accessibility to piped water Procure various sizes of pipes to cover 8km
(Orinie, Muserechi, Kiplombe, Mandina and
Chemelil.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Increase water coverage
Kipsaraman water project To serve fast growing Divisional
HQ, Kipsaraman
Raising main and distributions pipelines
Tank Construction
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Increase water coverage to serve 1,800 people
Kapkokwon water project Limited access to piped water Install water meters, chlorine doser, lay
distribution lines to serve the comunity
Increase/activate the number of consumer connections
Pemwai Water supply
Kabarnet Division
Limited access to piped water Install water meters, chlorine doser, lay
distribution lines to serve sumeiyon
Increase/activate the number of consumer connections
from the current 25 to 300 by 2015
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 187
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Kipkaech Water Supply
Kabarnet Division
Limited Source yield and coverage
of supply
Install new mains driven submersible
pumpset, hooking of electricity, lay rising
main and construct 100 m3 tank and lay
distribution pipelines
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Increase access to supply to 250 HHs
Bartabwa Dam Poor quality of water from the dam Construction of treatment works & Pipeline
extensions
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Improve water quality and increase water coverage
Talai Water Supply
Kabarnet Division
Limited Source yield and coverage
of supply
Install new mains driven submersible
pumpset, hooking of electricity, lay rising
main and construct 100 m3 tank and lay
distribution pipelines
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Increase access to 180 HHs
Tenges Water Supply
Tenges Division
Limited coverage caused by design
horizon
Rehab pipelines, metering, replace old
pumpsets and drill new borehole
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
TimboroaWater Supply
Mumberes Division
Inadequate water coverage Procure, lay raising main and distribution
lines of sizes 8" ,5",4",3" and 2" GI and PVC
totaling to 18 kms
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
1870HHs will be served by 2016
Kasskwanet Dam (Kiboino)
Salawa Division
Limited access to water supply and
lack of water for irrigation
Dam already designed.
Construction of dam, treatment works,
gravity pipelines, storage tank, distribution
pipelines and canals
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
1500 HHs and1700 hectares under irrigation
Kapterit water Project Limited water services for domestic
use
Survey and design complete.
Awaiting funding
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
1200 HHs will be served
ERAWASCO
Inadequate pipe supply system,
Metering, lab equipment & water
billing system.
Replace the current pipe system in Ravine
Town. Construct extension pipelines, tanks
and install more service metres. Construction
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity ;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 188
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
of Phase 2 treatment works.
21,000 HHs will be reached by 2017.
Eldama Ravine Sewerage
Works
Lack of waste water disposal system
in the town
Construct sewer system and Treatment
Works
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
8,000 HHs will be connected to sewer system
Olerai springs water project Inadequate water coverage Construct intake weir, gravity main,
distribution system and 150m3 balancing
tank.
Improve access to safe water in rural areas
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
1,200 people
Chemolingot water supply Inadequate water supply to the
growing town
Drill and equip 3rd borehole, pipeline
extensions
Improve access to safe water in rural areas.
Increase access to sanitation in rural areas.
Increase water storage and harvesting capacity
200 HHs will be reached by 2017
Marigat Sewerage Works Lack of wastewater disposal system
in the town
Construct sewerage systems Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
100 HHs will be connected to sewer system
Marigat water supply Inadequate water services for the
growing town
Investigate, site, drill and equipping of 4 No.
boreholes and lay rising mains and
distribution lines.
Expand treatment works and provide
wastewater disposal system
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Expand system to cover 500 HHs
Churo Bh Water Supply
Inadequate water services for the
growing market centre
Investigate, Plan and Design new Bh to
augment existing scheme
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Expand system to cover 500 HHs
Mogotio water supply Inadequate water services for the
growing town
Investigate Plan and Design new water
supply system.
Provide wastewater disposal system
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity ;
Expand system to cover 500 HHs
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 189
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Chirial dam Poor Water Coverage Feasibility study, Survey and design Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
Serve 6500 people and irrigate 150 acres
Muserech pan
Esageri division
Lack of accessibility water Pan already designed.
Construction of pan.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
It will serve 120 HHs
Kichingiri B/hole Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas; Increase
access to sanitation in rural areas;
Increase water storage and harvesting capacity
It will serve 130 HHs
Magonoi, Kapsia Borehole Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas; Increase
access to sanitation in rural areas
Kimose water supply project Lack of water services Construct intake arrangement, rising main,
150 m3 tank and distribution mains
3500 people and livestion served
Kipsaa Multi Purpose Dam Access to safe water for domestic,
irrigation and power generation
Planning and design of dam and auxiliary
facilities including power generation and
irrigation.
Design and Tender documents ready for the project
Molo Sirwet Dam Inadequate water services for
domestic and enhancing food
security
Investigate, Plan and Design Dam along
Molo River
Design and Tender documents ready for the project
Sasurwo Gravity water
project
Accessibility to safe water supply
for domestic and irrigation
Construct intake weir & sump, lay gravity
main, 150 m3 tank
280 HHs will be served and 50 acres under irrigation
Rossy water project Inadequate water services Investigate, plan and design. Construct
intake, rising main and distribution to serve
Kimng‘orom and parts of Emining
8,500 people to be served
Kibonjos Dam Access to safe water for domestic,
irrigation and power generation
Planning and design.
Construction of dam and auxiliary facilities.
4,500 HHs served;
1,500 Acres Irrigated;
Power generation.
Kipketum Water Project Access water for domestic use Investigate, plan and design project.
Construction of intake, rising main and
4,200 people
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 190
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
distribution and tanks
Construction of water pans Accessibility to livestock water Excavate pans Kolowa – 2, Nginyany – 2,
Mondi – 2, Tangulbei – 2, Churo - 2
Increased access to livestock water by 15 per cent in
2017.
Kimiren Dam Poor Water Coverage Complete design & construction of dam and
auxiliary facilities
Increase Water coverage
Soket Water Access safe water for domestic and
livestock
Construction of intake, rising main, tanks and
distribution system
12,000 People
Cheraik Gravity water
project
Ravine division
Accessibility to safe water supply
for domestic and irrigation
Construct intake weir & sump, lay gravity
main, 100 m3 tank
180 HHs will be served and 10 acres under irrigation
Chumet Gravity scheme Poor Water Coverage Feasibility study, design & construction Increase Water coverage & boost food security
Kokorwonin Borehole water
project
Esageri division
Access to safe water domestic Hydro geological survey has been done
Drill, equip and construction of water kiosks
200 HHs served
Kapkechir water project Lack of water services in the area Investigate, plan and design new dam To serve 6,000 people
Kamasaba pan
Ravine division
Access to safe water for domestic,
irrigation
Planning and design.
Construction of pan and auxiliary facilities.
500 HHs served;
20 Acres Irrigated
Ngeiwan (Kibolony)
Gravity Scheme
Poor Water Coverage Construction intake, storage tanks & pipeline Increase Water coverage & boost food security
Tembwee B/Hole
Ravine
Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;.
Increase water storage and harvesting capacity
It will serve 100 HHs
Ketiborok Gravity Scheme Poor Water Coverage Construction intake, storage tanks & pipeline Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase Water coverage & boost food security
Tuikoin/Sinonin water
project
Ravine Division
Lack of access clean water Construct intake weir & sump, lay 10 kms
gravity main, 2NO.100 m3 tank
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
300 HHs shall be served
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 191
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Mochongoi Health Centre Inadequate water services in
Mochongoi centre and its environs
Stiting, drilling and equipping.
Construction of pump house.
Laying of rising main and distribution lines.
Construction of 100m3masonry tank.
Hooking electricity mains.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
2,000 people and health centre
Manuare-Ngarie water
project
Limited water services Construct intake weir, 100m3 tank, rising
main and distribution lines.
Construct pump house, hooking of electricity
and install pumping equipment.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
To serve 3,00 people and livestock
Kakapul shallow well
Kolowa Division
Limited access to safe water Motorize kakapul shallow well, pipeline – 3
km, storage tank – 50 m³
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity,
Increase access to supply to 100 HHs by 2014.
Spring rehabilitation Limited source yield and coverage
of supply
Katupen – pipeline repairs and extension
Nangarua – intake and storage
Chewarany – intake and pipleline
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase access to 300 HHs by 2016.
Kesesya Dam Poor Water Coverage Feasibility study, design & construction Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase Water coverage & boost food security.
Sitotwet Water Project Construct pump house, install pumpset, lay
of rising main and distribution lines;
Construct 150m3 tank.
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
1,250 people to be served
Lobotchun (Sibilo) Pan Poor Water Coverage Feasibility study, design and construction Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Increase Water coverage & boost food security
Kaginatia Pan Poor Water Coverage Feasibility study, design & construction Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 192
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Increase Water coverage & boost food security
Kimng‘orom Flow
Regulation Dam
Flow in Perkerra river fluctuates and
affect users downstream
Site already identified. Plan and design dam
and auxiliary facilities
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity;
Regulate flow and serve 120,000 people and livestock
downstream including Perkerra irrigation scheme
Rehabilitation of water
schemes
Disasters such as droughts, floods,
displacements and landslides cause a
lot suffering
Provide alternative water system in order to
help in restoring normalcy by absorbing
shocks inflicted by the calamities
Improve access to safe water in rural areas;
Increase access to sanitation in rural areas;
Increase water storage and harvesting capacity
15,000 people anticipated every 2 years
Irrigation Schemes
Eldume Irrigation scheme Ongoing phase 2 Lining of the remaining sections of main and
submain canals and construction of hydraulic
structures
Increase in irrigation acreage by 600 acres
Kapkuikui Irrigation
schemes
Completion of phase1and 2 Lining of main canal and hydraulic structures Increase irrigation acreage by 200 acres
Kamoskoi Irrigation
schemes
Ongoing and 2 Completion of main and sub main pipeline To supply water to irrigate 1,000 acres
Sandai Irrigation schemes Ongoing phase 1and 2 Completion of lining of main and sub main
canals
Increase irrigation acreage by 800 acres
Barwessa Irrigation scheme Ongoing phase 1 and 2 Lining of main canal and laterals Increase irrigation water efficiency and acreage
Lentorok Irrigation scheme Ongoing Irrigation headworks To irrigate 120 acres to cater for 70 HHs
Amaya – Nyalilpich Ongoing Survey, Design and construct headworks and
mains
New irrigation area
Emining Irrigation scheme Ongoing Construction of headworks and auxiliary
facilities
350 acres to benefit over 70 HHs
Molo Sirwe irrigation
scheme
Ongoing Construction of headworks and auxiliary
facilities
400 acres of new irrigation area
Maji Moto Irrigation
scheme
Ongoing Construction of headworks and auxiliary
facilities
250 acres
Ketikwo Irrigation scheme Ongoing Investigate, survey and design dam and
auxiliary facilities
200 acres
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 193
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Kipkokoi Irrigation scheme Ongoing Investigate, survey and design dam and
auxiliary facilities
300 acres
Ng‘enyin Irrigation scheme Ongoing Rehabilitate and lining of main canal 240 acres
Siriewo Irrigation Scheme New Investigate, Survey and Design and
construction of dam and auxiliary facilities
New irrigation area
Tangulbei irrigation scheme New Investigate, Survey and Design and
construction of dam and auxiliary facilities
New irrigation area
Ponpon Irrigation scheme New Investigate, Survey and Design and
construction of dam and auxiliary facilities
New irrigation area
Oighon – Korossi Irrigation
scheme
New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
New irrigation area
Barpello Irrigation scheme New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
New irrigation area
Emboses (Tirioko)
Irrigation scheme
New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
New irrigation area
Kolewon irrigation scheme New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
New irrigation area
Rebeko Irrigation scheme New Survey and Design and construction of
Headworks and pipeline with sprinler system
New irrigation area
Metipmoso Irrigation
scheme
New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
100 HHs
Kapkelelwa Irrigation
scheme
New Investigate, Survey and Design and
construction of Headworks and pipeline
60 HHs
Cheraik Irrigation scheme New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
100 acres to be irrigated
Aawei Irrigation scheme New Investigate, Survey and Design and 200 acres to be irrigated
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 194
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
construction of Headworks and auxiliary
facilities
Kicherere/Chebarsiat
Irrigation schem
New Investigate, survey and design dam and
auxiliary facilities
450 acres
Endao Irrigation scheme New Investigate, Survey and Design and
construction of Headworks and auxiliary
facilities
150 acres
Natan Irrigation scheme New Investigate, Survey and Design and
construction
500 acres
Equator (Mogotio) New Investigate, Survey and Design and
construction
500 acres
Kabiyet/Benonin Inadequate water supply Construction of 5 No tanks and 8 km of
pipelines
Improved access to safe water in rural areas
Barpello Gravity Scheme Inadequate water supply Construction of intake, gravity mains, tanks
and distribution
Improve access to the underserved area
Chepkanget intake water
supply
Inadequate water supply
Bokorin/Riwo
Construction of intake, gravity, tanks and
pipelines
Improve access to the underserved area
Awii Water Project Augmentation water supply Intake gravity mains and distributions Expand access to rural community
Tekeldet water project Inadequate water supply Provide water supply facilities to serve
community.
Improve access to safe water supply
Kokwototo water supply Present system inadequate Expand the distribution system and improve
scheme
Improve access to water by consumers
Chepkalacha borehole Present system inadequate Expand the distribution system and improve
scheme
Improve access to water by consumers
Kapropita spring expansion The spring is not fully utilized Construct more storage facilities and
pipelines
Increase the quantity of water available
Narosura water supply Existing system has been outstripped
by demand
Construct additional storage and pipelines
including new distribution sytem
Increase access to safe water for the community
Kibanger water project Inadequate distribution sytem Pipelaying to reach intended consumers Increase access to piped water
Nyoger gravity system Project not complete Pipelaying to reach intended consumers Increase access to piped water
Kapkiyai gravity water
project
Silting of intake and broken pipes Re-design and construct the intake and
rehabilitate/expand distribution
Make the water supply serve intended purpose
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 195
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Kibiriokwonin Water supply
extensions
Inadequate distribution systems Expansion of pipeline coverage Increase the HHs using piped water
Akorian borehole water
supply
Inadequate storage and distribution Piplaying and construction of tanks Increase the amount of water available
Soke Water Project Inadequate water supply Construction of intake, gravity mains, tanks
and distribution
Improve access to the underserved area
Kipkitur Water Project Inadequate water supply Construction of intake, rising mains, tanks
and distribution
Improve access to the underserved area
Kisanana Water Supply Inadequate water source for
Kisanana center
Drill and equip new borehole to augment
existing scheme. Rehabilitate existing
scheme
Increase the quantity of water available to consumers
Makutano – Maji Mazuri
Water supply
Inadequate water provision to the
community
Construction/augmentation and rehabilitation
of water supplies to serve the community
Community served by piped system
Mumberes Small Dam Inadequate water services in
Mumberes
IPD and Construct dam and auxiliary
facilities including pipelines, storage tanks
and distribution
Community served by piped system
Upper Chemususu water
supply systems
Inadequate water services in Upper
Chemususu dam
IPD and Construct water supplies to include
pipelines, storage tanks and distribution in
Ibobor, Kapsigot, Engunguny and Bikwen
Community served by piped system
Koiser/Ayatya Dam Inadequate water supply in the area IPD and Construct dam and auxiliary
facilities including pipelines, storage tanks
and distribution
Community served by piped system
Kuikui Water Supply Rehabilitation/ upgrading of water
scheme
Pipelaying anf construction of masonry tanks Increase access to piped water
Tirenwo water supply Rehabilitation/ upgrading of water
scheme
Improve intake and expansion of distribution
system
Increase quantity of water reaching consumers
Tebelekwo Bh Borehole not fully utilized Improve the borehole infrastructure to
include piping to community
Increase number of consumers accessing water
Nakurtakwei extension Chemususu pipeline does not serve
Nakurtakwei area
Construct tank and distribution system Access to safe drinking water by the community
Silonga BH water supply Point source Pipelaying and costruction of additional
tanks
Community get water closer to their HHs
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 196
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Nasinya BH water supply Point source Pipelaying and costruction of additional
tanks
Community get water closer to their HHs
Maoi 3 BH Augment Maoi systems Drill, equip and construct tanks and
distribution to serve Junction and Eldume
Access to safe drinking water by the community
Irrigation Schemes
Mosuro irrigation scheme Structures loose a lot of water Lining and wxpansion of system Increase acreage under irrigation
Rugus Irrigation Scheme Inadequate water reaching farm Expansion of existing infrastructure Increase acreage under irrigation
Embosos Irrigation scheme Expand scheme Investigate, plan and design scheme Increase acreage under irrigation
Chuine/Mbechot irriogation
scheme
Expand the community schemes Investigate, plan and design scheme Increase acreage under irrigation
Kiserian Irrigation scheme Improve the existing scheme Expansion of the existing infrastructure Increase acreage under irrigation
Endao irrigation scheme Inadequate water reaching farm Protection of headworks, transmission
system lining
Increase acreage under irrigation
Salabani irrigation scheme Improve existing scheme Investigate, plan and design scheme Increase acreage under irrigation
Mukuyuni irrigation scheme New irrigation scheme Investgate, plan and design scheme Increase acreage under irrigation
Nyalilpich Irrigation scheme Proposed scheme Investgate, plan and design scheme Increase acreage under irrigation
Desiliting of dams Increased surface water supply Investgate, plan and design scheme Excavation
Chesongo Borehole Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Ng‘usuria Water Scheme Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Kipsoit Water Scheme Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Sossion Dam Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Kibunder Dam Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 197
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Kiplewel Water Scheme Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Cheraik Dam Lack of clean water for consumption
and irrigation
Investgate, plan and design scheme Increased surface water supply and increased acreage
under irrigation
Desiliting of pans Increased surface water supply Investgate, plan and design scheme Excavation
Environmental Projects
Protection of water springs Increased underground water supply Planting of trees, grass
Construction of model tree
nursery one per sub-county
Increased availability of tree
seedlings for planting and serve as
demonstration site for farmers
Sub Counties Establishment of model tree nurseries
Development of dump sites To secure the dump sites and
manage solid waste
Sub counties Rehabilitation and fencing of all dumpsites
Soil erosion control To protect the soils Countywide Construction of check dams, gabions, terraces and
ground cover
Improved Charcoal
production
To improve the efficiency and
sustainability of charcoal production
Control and management of
invasive species Prosopis
juliflora
To reclaim land from prosopis
juliflora invasive weed
Marigat Sub county Use of improved eco friendly and sustainable
technology
Green Schools Programme Educate pupils and students on tree
planting and waste management Tree planting within schools
School cleanup
Segregation of waste
Establishment of green clubs
Agroforestry and
Reafforestation Programme
To increase forest cover Annual increase in forest cover by 1% from
33% to 38%
Requiring all land owners to have trees in at least 10%
of their land
Support commercial afforestation
Forest Products Value
Addition Programme
To develop the sustainable use of
forest products
Increase in proportion of income from
sustainable forestry products
Develop the sustainable development and utilization of
forest products e.g. Aloe products as well as furniture
and handicrafts from bamboofor income generation
Urban and Highway
Beautification Programme
To plant trees that make Baringo
more beautiful
Beautification of all towns and major
highways in the county
Select the signature species of each town
Tree planting in all plots and along the roads
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 198
Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators
Development of Kibute Dam Recreation Park
Housing
Development of
sites and services
schemes at existing urban
areas
Encourage landowners
To build decent houses
and to surrender part of
their land for
development
30 schemes with at
least 100 plot each
Negotiating for land
Zoning and planning
Building access roads
Water and sanitation
Private sector
Housing
Partnership
programme
Encourage private developers to
participate in housing development
1000 standard housing units Development of housing cooperatives
Partnering with locals and encouraging housing
developments.
Compiling and publishing data in the country
Provision of incentives e.g land rates
Partnering with NHC to build houses with county
government.
Appropriate
Building
Technology
programme
Advocate use of cost effective
construction technologies e.g hydro-
form
I Appropriate
Building
Technology Centre
(ABT) with I hydro-form
Machine in each sub-county
Promoting and funding
Research on development of low cost and locally
available building materials and techniques
Dissemination of knowledge and equipping available
polytechnics
Provision of equipment
Encouraging the locals to build decent houses with
decent homes with at least 40m2.
Security of public lands and
facilities
Safeguarding public land and
ensuring there is space for utilities
and future expansion in residential
areas
100 % of all public land Recovery of Government houses,
Liaising with NLC to recover illegally alienated land
Surveying, securing title and fencing of land for public
facilities
Securing way leaves and riparian reserves
Repair and maintenance of
government houses
To bring GOK houses to good
habitable state
100% of GOK houses to be repaired Routine maintenance
Major refurbishment
Fencing of GOK housing estates
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 199
11.6.3. Strategies to Mainstream Cross-cutting Issues
The sector addresses the social needs of the community through provision of basic social
facilities. It will try to ensure clean water is available to every household and for livestock.
The sector also employs a number of youths in casual labour thus mainstreaming youth
agenda and issues. Soil and water conservation efforts will be applied so as to protect the
environment since most of the projects have an impact on the environment.
11.7. General Economic, Commercial and Labour Affairs (GECLA)
The General Economic, Commercial and Labour Affairs (GECLA) Sector comprises of
eight sub-sectors namely: Regional Development Authorities; Labour; Trade; East Africa
Community (EAC); Tourism; Industrialization; Kenya Industrial Research and
Development Institute (KIRDI); and Productivity Centre of Kenya (PCK).
Vision:
A globally competitive economy with sustainable and equitable socio-
economic development.
Mission
To promote, co-ordinate and implement integrated socio-economic policies
and programs for a rapidly industrializing economy.
County Response to Sector Vision and Mission
The county will strive to improve trade and industry sub sectors in order to reduce
poverty. The measures that will be employed to realize this objective include: proper
utilization of resources in a sustainable manner with special emphasis put on
conservation of forests, development of agro based industries, like milk and meat
processing, to increase employment and income generating activities, advocating for
efficient rural finance and credit supply system for small scale farmers and
improvement of the governance. Security will be increased for trading, industrial
development and tourism to take place. At the same time, efforts will be focused on
maintenance, improvement and expansion of the infrastructure that is essential for the
sector to thrive. All these efforts will contribute greatly to the uplifting of the socio-
economic status of the county‘s inhabitants. Increased power supply will also lead to
emergence of small industries and the resultant income generating and employment
opportunities.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 200
Role of Stakeholders in the Sector
Stakeholders Role
Trade, Tourism,
Industrialization, Labour
Departments and Regional
Development Authorities,
Establishment of infrastructure and policy formulations for the
sector
Land Department Registration of land adjudication sections and settlement schemes,
issuance of title deeds and certificates of lease.
SACCOs, Micro-finance
institutions, Banks
Provision of credit facilities for small scale industries and farmers
for improving their inputs
Private sector Establishment of industries
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 201
11.7.1. Projects/Programmes
On-going projects/programmes
a) Flagship projects
Name of Project Location Description of Activities Status Implementation
Economic Stimulus Programme (ESP) (Fresh
Produce Markets)
Kabartonjo, Eldama Ravine,
Mogotio
Building of market shades and stalls Ongoing
CIPC Projects Kabarnet Building of Jua Kali Shades Complete
b) Other Projects
Trade and Industry
Project Name: Division/Location/
Constituency
Objectives Targets Description of Activities
Business management skills
development
Countywide
Equip traders with modern business management
skills;
Provide traders with an opportunity to network;
Increase their capacity to take risks;
Train 100 traders every
year
Identify training needs;
Develop training programs;
Train traders;
Evaluate training curriculum;
Work together with other service providers;
Emphasize cost sharing;
Business counseling
Countywide
Educate and inform entrepreneurs on new emerging
markets.
To counsel 500 traders
annually up to 2017 until
Offer counseling service to micro and small scale
enterprises.
Joint Loan Board
Countywide
Promote the growth of business in the county;
Create employment opportunities;
Promote availability of goods and services;
Future upcoming entrepreneurs to graduate for
commercial banks MFI loans.
To finance 80 traders
annually by Kshs1.05m
i.e. Kshs 7.35 m
Currently it has
disbursed a total of Kshs.
26, 325,000.00 to 1,271
beneficiaries
Finance micro and small scale enterprises
Encourage PPP
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 202
Export Promotion
Countywide
Increase the market for domestic product;
Enhance the competitiveness of export products;
Take advantage of the opportunities;
Expand the market for local products;
Add value to the export products.
Increase farm produce
for international markets
by 100% by 2017
26 sensitization meetings
held
To promote exports through
provision of information;
Identifying products with export potentials;
Assist in product development and marketing;
Sensitization of the business community on
opportunities provided by AGRA, Cotonou
agreement and Comesa.
Industrial promotion
Countywide
Attract both local and foreign investors 26 sensitization meetings
held
Identification of potential projects
evaluating the projects and sensitizing the local
community
Stalled projects/programmes
There are no stalled projects. This scenario can be attributed to the success of devolved funds projects implementations such as the CDF Fund
Outstanding Project Proposals
There are no outstanding projects proposals. This is because the projects proposals from the last Development Plans which were not
implemented have been included as new projects proposals in the County Development Profile
New Projects (MTP Consultations
Key Priority Area Key Issue Proposed interventions Indicators Outcomes
Short Term Medium Term
Untapped tourism
potential
Lack of industries
Inadequate promotion
of tourism scenery and
destinations in the
county;
Insufficient supply of
tourists Hotels and
hospitality services
Keep inventory and
document all potential
tourists sites;
Categorize tourists sites into
eco-tourism, sports-tourism,
cultural-tourism and general
tourism zones
Open up new tourists
sites;
Brand and market all the
tourists sites that have
been inventorized and
documented
Number of tourists sites in the
inventory;, documented and
branded;
Number of tourists who visit
the tourists sites in the county
every year;
campaigns undertaken per
year;
Number of tourists programs
initiated through PPP
Well documented and
branded tourists sites;
Increased tourists visits;
Increased awareness on
tourism importance;
Enhanced PPP
engagements in tourism
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 203
Key Priority Area Key Issue Proposed interventions Indicators Outcomes
Short Term Medium Term
Employment creation Inadequate skills;
Low literacy levels;
Inadequate sports
potential exploitation;
Use of child labour
Encourage Public Private
Partnerships to construct
sports training facilities
Initiate vocational training
colleges;
Create recreational and
talent academies in every
sub county in the county;
Establishment of talent
school especially
athletics;
Construct standard
stadiums;
Establish affordable
training camps and gyms
Increased skilled labor;
Increased literacy levels;
Unemployment rates in the
county;
Amounts of incomes for
households;
Number of talent academies
established;
Number of PPP initiated
training facilities;
Number of talent schools and
stadiums established
Increase in skilled labor in
the county;
Enhanced literacy levels;
Reduced unemployment
rates;
Improved incomes for
households;
Increased talent harnessing
Insufficient information
on the available
employment
opportunities in all
sectors;
Lack of an inventory of
youth, their
qualifications and
potential career
advancement
opportunities;
Insufficient post-
secondary school
training facilities
Institute an updated
inventory of available
employment opportunities in
all sectors;
Train youth on emerging
employment trends for easy
adaptation to emerging
employment opportunities;
Ensure 100% transition rates
to secondary and post-
secondary colleges
Establishment training
facility/college for labor
Number of training
centres/colleges established;
An inventory established on
employment opportunities and
youths and their qualifications;
One labor college established;
% of school transition rates
Improved engagement of
youth after Secondary
schools;
Updated inventory on
employment opportunities
;
Increased information
access on unemployment
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 204
Key Priority Area Key Issue Proposed interventions Indicators Outcomes
Short Term Medium Term
Saving, Investment
and Export
Inadequate access to
capital as collateral
Enhanced and improved
government credit facilities
such as the Women
Number of groups benefitting
from the enterprise funds;
Number of new business
enterprises initiated from the
Funds each year;
Amount of funds disbursed for
these enterprise funds
Improved economic
capacities;
Improved economic
returns
Insufficient Information
Technology access;
Inadequate access to
Financial Institutions;
Poor infrastructure
(Roads, Airstrips and
phone networks);
Insufficient access to
markets;
Low levels of savings
and investments in the
county;
Insufficient exports of
produce from the county
Strengthen Public Private
Partnerships;
Enhance the marketing
capacity of farmers;
Educate and facilitate
farmers to meet marketing
standards and tariffs;
Create County website;
Construct storage
facilities/cooling plants for
fresh produce
Enhancing existing
finance institutions
Rehabilitate airstrips at
Kabarnet and Kinyach
Number of ICT centres
established;
Number of airstrips
rehabilitated and maintained;
Value of produce reaching
market;
Number of SACCOs/banking
outlets established;
Number of people making
savings;
Volume of savings in the
county;
Volume of exports;
County website established,
maintained and updated;
Amount of updated market
information available to
farmers;
Number of banking systems
established
Increased ICT access;
Enhanced exposure to
international markets;
Enhanced value of produce
reaching markets;
Improved access to
financial services;
Enhanced saving and
investment culture;
Improved volume of
exports;
Improved communication
and interaction for best
practices sharing;
Enhanced access to market
information;
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 205
11.7.2. Proposed Projects (CIDP Subcounty Consultations)
Project Name Objectives Description of activities
Development of the Tourism Sector Plan
and Site Management Plans for all key
tourism facilities
To provide guidance for the development of the
tourism sector
Baseline Survey
Participatory Action Planning
Validation and Implementation
Development of Niche Products and
Services
To strengthen the Baringo tourism product Development of niche products e.g. birdwatching
Capacity Building Activities
Asset Preservation and Conservation
To develop game parks and reserves and other
assets for the tourism sector
Securing the land
Fencing
Purchase of Equipment
Conservation and protection of wildlife
Capacity Development
To develop adequate capacity to support the
tourism sector in the region
Training
Equipping Facilities
Recruitment of Staff
Expansion of the Tourist Information
Centre at Mogotio
To establish a significant tourist destination that
will attract visitors to the rest of the county
Design
Construction
Equipping
Establishment of Touristic Monuments
and Cultural Development Centres in
each sub county
To establish a significant tourist destination that
will attract visitors to the rest of the county
Design
Construction
Equipping
Acquisition of Courtesy Buses To facilitate visits by tourists to the county Purchases of buses
County Branding
To develop the image of the county as a progressive
home and attractive destination
Profiling the county
Generation
Media Campaigns
Livelihood Projects To reduce human wildlife conflict and ensure
proceeds of tourism trickle to communities
Promotion and Development of Tourism
Facilities
To increase the number of tourist in the county Eldama Ravine
1. Chemosusu Visitor Recreation Centre and Nature
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 206
Project Name Objectives Description of activities
Trails
2. Eldama-Kursalal Nature Trails
3. Tugumoi Migratory Bird Observatory Flyway
4. Equator Bird Flyway and Support Services
5. Development of County Camps at Chemorgong,
Kapkut, Esageri Forest and Sagat
South Baringo
1. Lake Bogoria National Reserve
a. Infrastructure Development
b. Signage and Safety Measures
c. Review of Management Plan and Policy
Document
2. Conservancy Establishment and Development
a. Chuine Conservancy
b. Proposed Arabal Mukutani Conservancy
and Corridor
c. Marigat Group Ranch Conservancy
Development
d. Kimalel-Sabor Group Ranch Conservancy
Development
e. Ng‘enyin Community Conservancy Area
3. Lake Baringo
a. Development of Lake Management Plan
b. Establishment of Safety and Navigation
Structures
c. Development of Water Sports and Sport
Fishing
d. Establishment of Inland Community
Livelihood Enterprises
e. Camp sites and picnic sites
4. Development of Ruko Conservancy
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 207
Project Name Objectives Description of activities
5. Development of Meisori Ilchamus Cultural Centre
and Ostrich Farm
6. Karau Campsite
Tiati
1. Opening of the Samburu-Baringo Tourist Circuit/
Corridor
a. Churo visitor monitoring centre
b. Peace Initiative Activities
c. Development of a linkage facility with
Laikipia, Samburu and Turkana
d. LAPPSET
2. Development of Conservancies
a. Kaptuya Conservancy including the
establishment of KWS post
b. Nachurur/Amaya Conservancy and
Cultural Centre
c. Mukutani-Ruko conservancy and corridor
d. Kositei ecotourism centre and nature trails
e. Development of Lomechan cave, Ostrich
Farm and campsite
3. Establishment of Reserves
a. Silale Game Reserve
b. Lokis Game Reserve
c. Cheparuas / Natan Conservancy
d. Paka/Korosi Conservancy
e. Mt Tiati Kamurio Geopark
4. Promotion of Home stay & Tourist Facility
Development
Baringo North
1. Lake Kamnarok Game Reserve
a. Development Planning and Implementation
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 208
Project Name Objectives Description of activities
2. Conservancy / Corridor Development
a. Kaborion Conservancy
b. Chepkirong Bartum Conservancies
c. Rorob Lingok
d. Forest Sites: Katimok, Saimo, Kasok
e. Ecolodges Tourist Resorts and County
Camps
3. Promotion of Scenic Sites Development
a. Simot Water Falls
b. Nuregoi Hill
c. Saimo Athletics Training Camp
4. Development and Promotion of Palanteology
Tourism
a. Museums
b. Field Study and Research Centres
c. Protection of Fossil Sites
5. Development of home stay tourism
6. Cultural Centres
Baringo Central
1. County Campsites Geoparks
a. Kipng‘ochoch
b. Kaprepo
c. Morop Tarambas
d. Kirdam
e. Pemwai Forest
2. Seguton
a. Governors Camp and Geopark
3. County Hilltops, Geoparks and Gorges
a. Kipsacho
b. Cheptuino
c. Development of nature trails and provision
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 209
Project Name Objectives Description of activities
of safety measures at Cheploch Gorge
4. Promotion and development of nature trails
5. Development and promotion of rural lodges and
campsites
a. Ng‘etmoi Sports Camp
6. County Communication (Radio) Towers and Masts
Mogotio
1. Promotion of eco tourism
(a) Kabarbama range
(b) Erong sanctuary
(c) Net bon maji moto
(d) Terebkororom
(e) Arus
(f) Curio shops and campsites
Countywide Projects
1. Youth and Women Enterprises
a. Curio shops and handicrafts workshop
b. Tourism Service Providers
c. Guides and Porters
d. Arthistes
2. Development of Viewpoints and Rest points
a. Lake Bogoria Kapulio Flamingo lookout
b. Ng‘iniot Kabarnet Kiboino Road
c. Katip Kituro
d. Ng‘in-ng‘in Sirwa
e. Kapkut Tugumoi
f. Ling‘ok Cliff
g. Kipng‘ochoch
h. Equator Mumberes
3. Tourism Signage
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 210
Project Name Objectives Description of activities
Construction / Upgrading of 2 markets at
major trading centress
Improved quality and hygiene and increased market
access.
Construction of new markets or Expansion and equipping of
existing markets to modern levels
Joint Trade Loans Programme
in the whole county
Provide affordable finance for small
scale enterprises.
Provide business management skills
to entrepreneurs.
Issuing of loans to micro
and small scale enterprises.
Training of entrepreneurs on
business management
Producer Groups Creation and facilitation of at least 40 ―Producer
Business Groups‖(PBGs) Partnership Building
Mobilization
Capacity Building
Joint PPP Investment in 2 Value
Addition Factories per county through
BIC with local cooperatives / investors
Promote industrial development, job creation and
value addition
Preparation of feasibility documents
Investment
Startup and Operation
Development of Minerals Resource Map
Develop an accurate resource profile of the county Study
Review
Publication
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 211
11.7.3. Strategies to mainstream cross cutting issues
In mainstreaming of cross cutting issues, the sector will ensure that environmental issues are
considered in all business and industry ventures. Issues of HIV/AIDS will also be integrated
in programmes especially those involving foreign tourists whose cultures my not conform to
the acceptable county morals. On HIV/AIDS, the sector will continue to integrate HIV/AIDS
curriculum in trainings for traders on entrepreneur skills.
The sector will also focus on technologies and enterprises that are friendly to the environment
including protection of water catchment areas that are found near industries. Sensitization on
the need to conserve the environment to promote sustainable development will also be
pursued.
This sector will, endeavor to mainstream cross cutting issues in all its activities. These issues
include youth, gender, disabled and orphans by incorporating in programmes being
implemented. The sector will also provide members of vulnerable groups with employment
opportunities whenever possible.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 212
11.8. Health Sector
The Health Sector comprises of Ministries of Medical Services, Public Health and Sanitation,
Research and Development sub-Sectors.
Vision
An efficient and high quality health care system that is accessible, equitable and
affordable for every Kenyan.
Mission
To promote and participate in the provision of integrated and high quality promotive,
preventive, curative and rehabilitative health care services to all Kenyans.
County Response to Sector Vision and Mission
The sector is mandated to provide, coordinate and promote the development proper
health care. The County Development stakeholders will give emphasis to review,
revise and establish a sustainable health management information system, provide
adequate, affordable, quality basic health, including supplies and equipment, improve
the cost revenue sharing, improve performance of Community Health Workers
(CHW‘s) and provide physical infrastructure in the hospital, health centers and
dispensaries. Rehabilitation of existing health facilities will also be done. Health
service management by posting competent and skilled staff at all levels of service
delivery.
Role of Stakeholders
Stake Holder Role
Government
Departments
Funding;
Staffing ;
Provision of drugs and equipments;
provides the relevant policy development
Development Partners Provides financial support for various;
Programmes within the sector;
Households, parents
and communities
Resource mobilization and
Management of the sector programmes at all levels of care
Community Participate in preventive medical activities and programmes and cost share in curative
medical services
FBOs Supplement government efforts in provision of medical services
Private Sector Supplement government efforts in provision and improving access to health services
KEMSA Procure and supply medical supplies. Replenishment of stocks of medical supplies in public
health facilities.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 213
11.8.1. Project and Programme Priorities
(a) Flagship Project ongoing
Name of Project Objectives Targets Description of Activities
Bartabwa Health Centre-
Model
Deliver Health Services to the
community
2000 people MCH/Building women and men wards/Incinerator/gate/Kitchen
Mochongoi Health Centre-
Model
Deliver Health Services to the
community
2000 people MCH/Building women and men wards/Incenerator/gate/Kitchen
(b)On-going Projects/Programmes: Health
Project Name
Location/ Sub-county/ Constituency
Description of Activities
Marigat - DMOH Office Completion Completions of remaining works
Kabarnet Male and Amenity Wards Construction
Marigat Paediatric ward Construction
Baringo North - Theatre Construction to start in January 2014
County Health Offices Construction to start in January2014
East Pokot Theatre - Chemolingot Construction
Eldama Ravine Rain Water Harvesting construction
Upgrade Mogotio Dispensary to Sub-County Hospital Construction
Kabarnet Mortuary - 48 bodies chamber and Structure Construction
East Pokot (Churo) - maternity ward To start in January 2014
Baringo North (Kuikui H. Centre) To start in January 2014
Eldama Ravine (Mortuary Coolers) To start in January 2014
Rehabilitation of Sewerage and Lagoon at Kabarnet. To start in January 2014
Upgrading dispensaries to offer laboratory services 2 dispensaries per ward To start in January 2014
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 214
Project Name
Location/ Sub-county/ Constituency
Description of Activities
Casualty Unit ongoing 2 Sub-Counties To start in January 2014
Construction/ Upgrading of Dispensaries at Ksh. 2.26 Million per Ward To start in January 2014
Vehicles purchase - 7 vehicles 4 Ambulances and 3 utility vehicles
Project Name Objectives Targets Description of Activities
Renovation of all health facilities Improve the health facilities. All the health facilities in the
county.
Repairs and painting.
Construction of Model Health centre Improve access to health care Five new facilities Construction and expansion of health
facilities
Construction of Dispensaries in the
county
Bring health
services nearer to
people
10 dispensaries in every Sub
County completed
Construction works
11.8.2. On-going Projects and Programmes: National Hospital Insurance Fund
Project Name Objectives Targets Description of Activities
Replacement of membership manila cards with
magnetic stripe photo cards
(All Sub counties)
To reduce recurrent costs of
yearly renewals and improve
on the speed of claim
reimbursements
All NIHF members and their
dependants
Photo collections, registration and updating of
members particulars and those of their dependants
Connecting of accredited health service
providers in the county to NHIF office.
(Kabarnet, Edama Ravine, Nogotio, Kabartonjo
and Marigat)
To improve the effectiveness
and efficiency of payment of
benefits to member/health
provides
To pay all submitted claims that
within 14 working days
Procurement of card readers;
training of staff;
Networking of the offices to the fund.
Increasing the coverage of NHIF insurance
cover among the informal sector (All Sub
counties)
To encourage the public to
empress social health
insurances system
All Kenyans of 18 years and
above but in formal employment
Mounting registrations;
campaigns in the county;
Advertising through the print media and radio
with the widest coverage within the county.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 215
Project Name Objectives Targets Description of Activities
Increase the number health services providers in
the underserved areas of the county that meet the
minimum NHIF accreditation criteria
Health centre with inpatient
facilities
To increase point of service to
NHIF contributors;
To improve accessibility of
health services
Mounting awareness campaigns
ii. New Projects (MTP 2 Consultations)
The MTP consultations identified health as an important priority and proposed various interventions whose expected outcome is a healthy
Population and a Health county
Key Issue Proposed interventions
Indicators
Lack of facilities & equipments Upgrade one hospital to a county referral hospital;
Expand bed capacity and build more wards at Kabarnet Sub
County hospital;
Establish a regional transfusion centre;
Construct one public health laboratory
Under five mortality rate reduced;
No.Maternal Mortality rate reduced;
Skilled Attendant at birth;
Children under 1year fully immunized;
HIV prevalence rate;
Patience on ARVs;
Proportion of inpatients with malaria;
No. of Health Facilities; Upgraded to Sub -County
Referral level;
No. of new staff recruited;
No. of dispensaries upgraded;
% increase of people accessing water
Upgrade 6 hospitals to a sub -County hospital; Hospitals -
Eldama Ravine, Marigat, Emining, Chemolingot, Kabartonjo,
Tenges.
Inefficient distribution & inadequate Medical
supplies
Strengthen and equip referral facilities/ systems
Procure seven ambulances.
Establish 60 community units in the county.
Availability of ambulance and equipments in the health
facilities
Improve access to health facilities Procure one integrated mobile clinic services vehicle. For
East Pokot Sub County
Accessabilty of health facilities in remote areas of the
county on time and distance.
Poor emergency Preparedness and response Completion of existing infrastructures and equipment of
Health facilities;
Preparedness and readiness to attend to emergecies
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 216
Key Issue Proposed interventions
Indicators
Replace all asbestos roofs for health facilities. Complete
Kipnai Dispensary, Chemolingot Ward and theatre, Marigat
Maternity Ward, Kabartonjo X-ray department. Kituro health
centre, Tilingwa dispensary, Eldama ravine Mortuary,
Nakoko, Kadokoi, Katungura, Chepkalacha, Mugurin
dispensary, Kipsogon, Chemoinoi, Muchongoi, Sibilo.
High HIV/AIDS prevalence Recruit additional Staff as per the cadres required
To be deployed as required throughout the county;
The rate of prevalence in the county
Under-staffing, inadequate referral facilities
Facilities are insufficiently equipped
Lack of casualty unit in each of the existing
health facility
Lack of an emergency unit each of the four
district hospitals
All Health workers to be trained; to upgrade their skills/
Inservice training. University trainings etc.
Procurement of New equipments for the staff / Built casuality
and Emergency units in the health facilities
Number of skilled staff deployed in the health sector/
Modern equipments installed in the health facilities.
IV services lacking severely Continuous training of staff / Upgrading of skills to all
cadres;
To be deployed as required throughout the county;
Number of staff that upgrade their skills and deployed
Inadequate Human Resource Development Employment and deployment of support staff.
Appraisal and promotion of staff according to duration of
service.
Training of supervisors on appraisal systems.
Number of staff employed and deployed.
Number of staff trained and promoted
Promote staff who have stagnated for over 3 years;
Review and harmonize salaries.
Provide insurance covers to staff.
Provide hardship and extraneous allowance
Improve remuneration for staff
Establish of a county central supply store at Kabarnet.
Number of staff promoted/ Salary structures
harmonized/other emoluments worked on.
Inefficient distribution & inadequate Medical
supplies
Establish a county pool system.
Establish a county supply store for Drugs, Vaccines (Cold
Chain), Non-pharmaceutical equipments, reagents and
Medical supplies store established to store vaccines/
Lorry for distribution procured.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 217
Key Issue Proposed interventions
Indicators
chemicals
Procure one Lorry.
Procure seven utility vehicles.
Inefficient transport system Procure vehicles for transportation and logistics
This interventions to target schools, market centers , villages
Number of vehicles procured for logistics.
Poor community Environmental Health Scaling up Latrine coverage by 20% All 6 Sub County
headquarters
Percentage of latrine coverage
Poor Urban Sanitation Develop sewerage system at Eldama Ravine, Marigat,
Emining, Chemolingot, Kabartonjo, Tenges health facilities
Sewarage systems established in medical facilities
Poor Solid Waste Management Improve solid waste management: - construct 10 incinerators
in hospitals at Kabarnet
10 incinerators established in the health facilities.
Poor Solid Waste Management Construct a pathological incinerator for the county referral
hospital at Eldama Ravine, Marigat, Mogotio, Chemolingot,
Kabartonjo, Kabarnet towns
Number of pathological incinerators constructed in the
health facilities.
Poor Solid Waste Management Identify and develop dump-sites in the sub-counties at
Eldama Ravine, Marigat, Mogotio, Chemolingot, Kabartonjo,
Kabarnet.
Number of dumpsites established in the county
Poor disease response by the medics Set aside sub-county Outbreak Response funds for Disease
Outbreak Management Unit at Kabarnet
Funds for disease outbreak response established in the
budgets.
Poor Keeping of disease data Establish a county data base centre Disease databank for the county established
11.8.3. Proposed Projects/ Programmes: Health Services
Project Name
Objectives Targets Description of Activities
Completion and equipping of
all stalled and Continuing
Health Facilities in all
Constituencies in the County
Improvement of medical service
delivery and health care for the
community
Completed Health facilities Improvement of infrastructure
and equipment at the facility.
Upgrade Enhance the capacity of hospitals in the MTC upgraded Resource mobilization, Design, Construct and
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 218
Project Name
Objectives Targets Description of Activities
Medical Training Center at
Baringo County Referral
county with ready supply of medical
staff.
Bring medica services closer to the
people.
Equip
Upgrading the current level 3 sub-County
hospitals to level 4:
Marigat, Chemolingot, Tangulbei, Ng‘oron
Mogotio, Eldama Ravine and Kabartonjo
Improvement of medical service
delivery and health care for the
community
7 level IV hospitals
(Sub-County hospitals)
Resource mobilization, design, construction,
staffing and operationalisation
Support Kaptimbor to be a specialist maternity
hospital
Improvement of medical service
delivery and health care for the
community
Complete maternity units
established and equipped
Resource mobilization, design, construction,
staffing and operationalization
Upgrade 12 level II Health Centres to level III
health Facilities - 2 per Sub County
Improvement of medical service
delivery and health care for the
community
12 level III hospitals Construction, Repairs, equipping and staffing of
the facilities to merit upgrade.
Upgrade of 4 level I dispensaries to level II
health facility per ward
Improvement of medical service
delivery and health care for the
community
24 level II hospitals (Health
Centres)
Construction, Repairs, equipping and staffing of
the facilities to merit upgrade.
Construction of level I health facilities
(Dispensary) Countywide.
Improvement of medical service
delivery and health care for the
community
45 level I hospitals Construction, Repairs, equipping and staffing of
the facilities to merit upgrade.
Promote specialists in at least 2 hospitals for
Ophthalmology, trauma/orthopedic and Mental
areas/alcohol centre
Improvement of medical service
delivery and health care for the
community
Improve immunization coverage - countywide Increase coverage to 85% - national
target
Countywide Undertaking yearly NID campaigns in worst areas
Scale up Community health strategies/activities Improvement of medical service
delivery and health care for the
community
2 units per sub-County Supporting running of the units
Roll down of CLTS Improvement of sanitation Countywide Sanitation facilities and capacity activities within
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 219
Project Name
Objectives Targets Description of Activities
and health care for the
community
households/community levels
Support nutritional activities Improve nutritional status among key
populations
Countywide Support Nutritional activities
Seek/facilitate title deeds acquisition for all
health facilities
Improve planning and order in all
facilities
Countywide PDP plans and title deeds acquisitions
Acquire 7 more ambulances Improve ambulatory services 7 hospitals Procurement of 7 ambulances services and
management
Construction of staff houses Improve services delivery All hospitals and selected
health centres
Construction, Repairs, equipping and maintenance
of the facilities to merit upgrade.
Establish Pathology incinerators Improve disposals In 10 hospitals Constrution and maintenance
Health data management Improve data storage and use In all level 3 to 5 Set up and run
Road Safety Programme Creation of awareness on road safety for PSV
drivers and motor bike operators
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 220
11.8.4. Cross-cutting issues
While addressing health issues in the health facilities, gender will be considered. Efforts will
be put in place to capture data well to inform planning and policy. In both county and sub
county hospitals, youth friendly centers will be introduced and both the youth and other
patients encouraged toundergo VCT. Husbands will be encouraged to accompany their
spouses to the PMTCT through introducing male friendly services. Environmental
conservations methods and cleanliness will be intertwined with other health related courses
inducted to members of general public, this, will reduce malaria related cases. The above
strategies will ensure that the following MDGs are achieved; reduce child mortality, improve
maternal health, combat the spread of HIV and AIDS, malaria and other diseases, and ensure
environmental sustainability.
11.9. Social Protection Culture and Recreation
This sector at the County level is represented by sub sectors such as, Gender, Children
and Social development, special programmes; youth affairs and sports and related
research and Development.
Vision
Sustainable and equitable socio-economic development and empowerment of all
Kenyans.
Mission
To formulate, mainstream and implement responsive policies through coordinated
strategies for sustained socio-economic development of the country and
empowerment of vulnerable and marginalized groups and areas.
11.9.1. County Response to Sector Vision and Mission
There have been various efforts to enhance the community capacities for self reliance
and greater participation by all in the development process of the county. This has
been done through community mobilizations as supporting community based
development programmes with particular emphasis on women, children, older
persons, youth, physically challenged persons, the poor, internally displaced persons
and other disadvantaged groups. CDF, YEDF, WEDF, special fund for PSWD/PWDs,
OPCT and Children Funds has played a critical role in empowering youth, women,
PSWD/PWDs, Older persons (65 and above) and children. Constituency HIV/AIDS
Fund has also supported HIV/AIDS control interventions in the county. Other
interventions on drought preparedness, mitigation against drought effects, provision
of relief food and reconstruction will be scaled up.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 221
Role of Stakeholders in the Sector
Stakeholder Role
Provincial Administration Enable a good environment for political, social and economic development
Micro Finance institutions Provide credit facilities
Development Partners resource mobilization
CSOs Supplement the government effort in providing sourcing and mobilizing resources
Private sector Provide local resources
Community Participate in local development projects
NACADA Drug abuse awareness campaign
World Vision, Christian Fund,
Action Aid- (NGO‘s)
Provision of text books and physical facilities to schools, support children from poor families with fees and uniforms (child
sponsorship)
Social Services Department Mobilize communities to form groups to address their local problems, provide training to groups registered by the
department, avail grants to groups and persons with disability, elderly, loans to women, mitigate against FGM/SGBV,
enhance 30% affirmative rule in dev., employment, committees, entrench the Disability Act 2003 .
Sport Department/ Youth Office Coordinate sporting activities, provide advice on sports related matters, and tap the local sporting talents and coordination of
youth affairs.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 222
11.9.2. Projects and Programmes
On- going Project/Programmes Project Name
Objectives Targets Description of Activities
Youth Enterprise Development
fund Sub County scheme
Empower youth groups start/upgrade
their enterprises
All registered youth groups in the
County
Provides loans of minimum of Ksh.50,000 to
youth groups to run their enterprises
Youth Enterprises Development
Funds Financial intermediary
scheme
Empower individual youth/Youth groups
to start/ upgrade their enterprises
All the youths in the county Youth apply for the loan as per the financial
intermediary regulations the amount of the loan is
up to a maximum of Kshs.500,000
Youth Polytechnic training
programmes
Equip youth with technical knowledge
/skills
All youths in the county interested in
technical fields
Youths enroll with youth polytechnic for a two
year training on variety of technical fields
Children right awareness
campaign
To create an awareness on children right
protection in the County
Harmful cultural practices
Child protection and care
Child maintenances and custody
Children in conflict with the law
Public meeting in the County organized at
location, sub-county
To address higher institution of leaning and leader
forum on child rights.
Children events Support the participation of children in
children national events in the county
Organize participation of children in
children National events that include
Day of African child
World orphans day
Breast feeding week
World day against child labour
Worlds play day
Universal children day
The children events to be done at sub-county
level.
County Children Assembly Children representative in the County to
Assembly twice a year.
44 children that form the Assembly,
assemble twice a year for discussion
on children issues.
Twice in year children representatives assemble at
County level for a County children Assembly.
Children desk Every police station to have a functional
children desk.
All police stations in the County Children desk facilities, personnel
Volunteer children officer Every location in the County to have at
least one volunteer children officer.
All location in the County Recruitment and training of volunteer children
officer (VC0‘s)
Charitable children institutions To register new charitable children Register 4 new charitable institution Registration procedures and regulations of CCl‘s
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 223
Project Name
Objectives Targets Description of Activities
institutions.
To inspect charitable children institution.
Inspect all the existing and new
charitable children institutions
to be followed.
Area advisory committees to recommend
registration and the sections
Care and protection of children County support to orphans and
vulnerable children, children with
disability, children living in street
children of imprisoned mothers
Orphans and vulnerable children
Children with disability
Children hung in street.
Children of imprisoned mother
County support for care and protection of children.
County child protection network Establishment of the county child
protection network
All stakeholders in children issues in
the county
Identification of stakeholders
Stakeholders forum
Area Advisory Council Operationalisation of localitional area
advisory councils at district area
advisory council.
All location
All sub-counties
Line ministries members, FBO‘s, CBO‘s and
Business community members to be engaged to
form area advisory councils
Project Name Objectives Targets Description of Activities.
Youth Enterprise Fund
Creates jobs
Reduce idleness/drug
abuse/crime.
Provide capital for
investment.
Spur youth creativity.
Create interest in youth
on financial institutions.
Youth groups.
Youth aged between 18-35
years.
Advance loans to qualified youth groups(Max Kshs 50,000)
Advance loans to qualified individual or groups by engaged banks and
financial intermediaries.
Youth Empowerment Centres
(county wide)
To equip the youth with
information relevant to
their day today activities
and engagement.
To provide policy and
development information
such as vision 2030,
MDGs, youth policy and
so on.
Youth aged between 15-35
years.
To provide training on specific and identified areas.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 224
Project Name Objectives Targets Description of Activities.
Women Enterprise Development
Fund/Flagship project/county wide
To provide capital to
women & women groups
to expand their projects
3000 women and women
groups
Revolving loan schemes to individual and well performing women
groups./Can be replicated by the county government and its supporting
partners
PWSD –CT Program/Flagship
project/countywide
To provide grants/stipend
to persons with severe
disability as a source of
livelihood.
140x6 sub-counties=840
persons
Grant to severely disabled persons/Can be replicated by the county
government and its supporting partners as the clients are more than the
national government is supporting –over 3,000 needy cases
Orphan and Vulnerable Children
funds
To provide the orphaned
and vulnerable children
with a source of
livelihood.
3,000 households Grant to the orphaned and vulnerable children.
Cash transfer for the Older persons
(65 yrs and above) /Flagship
project/county wide
To provide the elderly
persons with a source of
livelihood.
4,500 persons Grant to the elderly persons./ Can be replicated by the county
government and its partners as demand is higher than the national
government can provide
Grants to Community
initiatives/county wide
To supplement
community initiatives 7
serve as model groups
Well performing groups- 48
groups county wide
Grants to well performing groups selected randomly across the county
Formation of Gender working
committee/sub-counties and county
To assist in mitigating
FGM/SGBV &
entrenching 30% rule
The whole community Structure to assist in mainstreaming Gender issues in the community
Formation of Disability working
committees/sub-county & county
To assist in mitigating &
entrenching disability
issues
The whole community Structure to assist in mainstreaming disability issues.
Training & supervision/county
wide
To capacity build
communities
The whole community To train individuals, groups, and communities on various group
dynamics 7 government policies
Construction of dining hall and
general refurbishment at CCSP
Marigat
To facilitate training Trainers/community To construct hall and refurbish roof of other buildings
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 225
Project Name Objectives Targets Description of Activities.
Construction of sub-county Gender
and Social Dev. Offices at Marigat,
East Pokot, Baringo North and
Mogotio
To house the department
staff so as to serve
wananchi
Department staff / community To construct offices
Refurbishment of houses, road
repair, rain water harvesting at
Kabarnet V/R Centre
To serve the
trainees/staff/clients
Trainees/staff/clients To refurbish, repair road and rain water harvesting
Purchase IT equipments To digitalize services in
the various dept. offices
Staff/clients To purchase IT equipments.
11.9.3. New Projects (MPT 2 Consultations)
Key Priority Area Key Issue Proposed interventions
Short term Medium term
Culture Retrogressive cultural practices Campaigns to take children to school
Organize exchange programmes for
youths to share ideas
Identify and promote talents and
artists.
Organize cultural events
Sensitize the communities against
retrogressive cultures
Allocate funds for these activities.
Youth/Empowerment Lack of skills/ entrepreneurship spirit
amongst youths
Develop youth polytechnics;
Enhance Youth enterprise Fund
One youth polytechnic per
division
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 226
Key Priority Area Key Issue Proposed interventions
Short term Medium term
Children Child Abuse and Neglect
Employ more staff to implement the
children‘s Act Conduct lobbying and
advocacy against child abuse and
neglect;
Enforce the children rights bill
Strengthen volunteer systems at
the county level. One rescue
centre per Sub County.
Allocate funds for these
programmes
Gender Mainstreaming Gender discrimination in accessing &
controlling of resources
Establish rescue centres in the
county deploy gender officers to all
Sub Counties;
Enforcement of gender Employ
more staff;
Train opinion leaders;
Encourage women participation in
leadership positions
Organise women through
registration of groups;
Enhance Women enterprise laws;
Implement policy of a third rule of
women inclusion in all committees
Allocate funds for these
programmes
Youth Empowerment Lack of youth friendly centres establish youth friendly centers -
sports facilities, rehabilitation
centres, youth empowerment
centres; Establish mentorship
programmes;
allocate funds for registration and
trainings
3 training camps
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 227
Key Priority Area Key Issue Proposed interventions
Short term Medium term
Advocacy and lobbying for youth
issues;
Disabilities/PLWHs Discrimination against the disable,
children, the aged and PLWHAs.
Make all institutions friendly to the
physically challenged persons at all
levels;
Support the physically challenged
with necessary tools and
equipments; Establish youth
friendly VCT centres; Enhance
Social protection for the aged and
vulnerable;
Establish homes for children, the
old, disable and other vulnerable
groups.
Rehabilitation centre in each sub
county;
Allocate funds for these
programmes; Enhance cash
transfer funds
Establish 6 youth friendly VCT
centre in the county – each Sub
Count;
Rescue centre Child abuse To establish a rescue centre at
Marigat by 2015 to be able to
accommodate 100 rescued children
Fully functional child rescue
centre
Juvenile system Ease access to justice To establish a child protection unit at
every police station in the county
Child acces to jstice
Acquire land for 1 Children home/rescue centre in
every sub-county
Child abuse Set aside land in every constituency
for establishment of children home
/rescue centre
Fully functional rescue centre
Project name and location Objectives Targets Descriptions of activities
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 228
Establishment of cultural Centres To preserve and conserve community‘s
cultural heritage ,tourist attraction and
acts as a repository to cultural materials
15 cultural centres Renovation of illchamus manyattas and increasing the
number from 2 to 3 – estimated to cost Sh200.000
cost Sh200.000
Building of guest houses similar to the Manyattas With
complete suits and a restaurant. Initial stage construct
three will cost an estimated kshs 500,000 each.
Totaling 1,500,000.
A curio shop at a cost of 500,000
Installation of electricity Sh35,000
Equipping the centre with furniture at accost of
Sh100,000
Completion and repair of carpark, toilets and fencing of
the compound Sh500,000
Lembus cultural centre
Located in Eldama Ravine
To preserve and conserve community‘s
cultural heritage ,tourist attraction and
acts as a repository to cultural materials
Lembus community and
environs
Building of guest houses similar to the cultural homes
With complete suits and a restaurant. initial stage
construct three will cost an estimated kshs 500,000
each. Totaling 1,500,000.
Curio shops at initial cost of kshs 500,000
Botanical garden fencing and getting seedlings at a cost
of kshs 200,000
Gallery renovation kshs 2000,000
Turuturu cultural centre
Located in Baringo North , kerio valley
To preserve and conserve community‘s
cultural heritage ,tourist attraction and
acts as a repository to cultural materials
Arror community and
its environs
Curio shop at kshs 1,500,000
3 Guest houses at accost of kshs 1,500,000
Gallery kshs 2,000,000
Tugen cultural centre
Located
To preserve and conserve community‘s
cultural heritage,tourist attraction and acts
as a repository to cultural materials
Tugen community and
its residents
A gallery of kshs 2,000,000
A curio shop kshs 1,500,000.
Guest house 1,500,000
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 229
Pokot cultural centre
To preserve and conserve community‘s
cultural heritage ,tourist attraction and
acts as a repository to cultural materials
Pokot community and
its environs
3 Guest house at accost of kshs 1,500,000 totalling to
1,500,000
Curio shop at a cost of 1, 500,000
Gallery renovation and standardizing kshs 2,000,000
Endorois cultural centre
Tugen and Endorois
community and its
environs
Curio shop kshs1, 500,000
Gallery kshs 2,000,000
Guest house 1,500,000
Conservation and preservation of cultural
sites
Loruk komolion - Marigat
Kipsaraman Ororin – Baringo north
BaringoTulwongoi-Eldama -ravine
Benongoi –Sirwa cultural high court
Sigoro clay –Koibatek
Kabicha-Bogoria
Kolowa Memorial
Conservation of cultural site and
marketing for tourist destination and
documentation
For future generation
and present community
at large.
Fencing
Building resting sites and shades for guests
Documentation of site and posting to website
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 230
11.9.4. Mainstreaming of Cross-cutting Issues
The proposed projects in the sector has an overall goal of alleviating poverty through various
strategies such as drought management, community driven development support to local
development, promotion of cultural tourism, youth and women enterprises funds, youth
polytechnics.
Through cultural centres, youth empowerment centres, sports activities and conflict
management efforts, the issue of national diversity is mainstreamed. Similarly, this sector is
made up of ministries that deal directly with youth affairs, gender concerns of the physically
challenged and environmental issues through the Ministry of Special Programmes. HIV and
AIDS issues are also mainstreamed through capacity building efforts by the special
programmes sub sector and community campaign drives targeting the youth.
There are efforts in the county to ensure that all the disadvantaged groups such as the youth,
people with disability, women are involved in decision making of various development
programmes and projects.
The sectors interventions targets national disasters such as floods, drought and HIV and
AIDS through ALRMP 11 programmes.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 231
11.10. Governance, Justice, Law and Order Sector (GJLOS)
The sector comprises of the following sub-sectors: Immigration and Registration of Persons;
Home Affairs; Justice, National Cohesion and Constitutional Affairs; Provincial
Administration and Internal security; State Law Office; Judiciary; Ethics and Anti-
Corruption Commission; Kenya National Audit Office; Independent Electoral and
Boundaries Commission, Directorate of Public Prosecution, National Police service
Commission and related research and Development. Others are Commission for
Implementation of the Constitution; Kenya National Commission on Human Rights and the
Office of the Director of Public Prosecutions; Gender and Equality Commission; Office of
the Registrar of Political Parties; Witnesses Protection Agency and Independent Policing
Oversight Authority.
Vision
A Secure, Just, Cohesive, Democratic, Accountable, Transparent and Conducive
Environment for a Competitive and Prosperous County.
Mission
To ensure effective and accountable leadership, promote a just, democratic and secure
environment and establish strong governance institutions to empower citizens, for the
achievement of socioeconomic and political development
County Response to Sector Vision and Mission
The county will ensure that there is an enabling environment in the county that will
encourage economic growth and poverty reduction. One of the most important issues to be
addressed during the period is security. In this regard, the police and provincial
Administration will ensure that there is no disruption of peace and rampant cattle rustling are
curtailed. On the other hand, the prisons and probation Departments will Endeavour to
rehabilitate convicted offenders so that they positively integrate into the community.
Role of the Stakeholders
Stakeholders Roles
Provincial
Administration
Law enforcement, arresting offenders, mobilization the public, chair
various development committee meetings.
Police Department Law enforcement, arresting and prosecution offenders.
Judiciary Listen and determine cases of people accused of breaking the law.
Prison Department Keep in custody those convicted or remanded by a court of law, and
rehabilitate inmates with a view of making them better citizens.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 232
Stakeholders Roles
Probation Department Giving information to courts regarding offenders, assisting youths to
discard anti-social behaviours, assisting youths to acquire social skills
that enhance their self image, ensure that those placed under probation
adhere to the provision of the probation.
Registration of
Persons.
Registration of Kenyans who have attained the age of 18 years or above
by issuing them with the national
Civil Registration
Department
Register births and deaths that occur in the Sub County and keep
statistics on the same. Publicize the importance of civil registration in
development planning.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 233
11.10.1. Projects and Programmes
Ongoing projects and programmes
a. Flagship Projects
Project Name
Objectives Targets Description of activities
Deputy County Commissioners office at Mogotio
Sub County
Create a working environment for the officers to
deliver better services.
One complete unit of administration
block
Build complete units of
offices
Deputy County Commissioners office at Baringo
South Sub County
Create a working environment for the officers to
deliver better services.
One complete unit of administration
block
Build complete units of
offices
b. Other projects:
Project Name
Objectives Targets Description of activities
Children‘s advisory
committee countywide
Put in place mechanism for dealing with issues
pertaining to children
To re-activate Sub Countys/divisions
committee to make them responsible
to children issue in terms of care and
protection
Train area advisory committee at division and
location level
Baseline survey on OVC
Establish the number of OVC in the County for
planning purpose
Complete the survey on OVC Data collection analysis documentation and
dissemination
Awareness creating and
advocacy by children
right
Inform the public on children rights to gather their
support in addressing children in need of special
protection (CNSP)
Undertake activity in all divisions
through the plan period
Conduct seminars.
Use community leader and public functions to
create awareness;
Empower children know and understand their
rights
Building Administration
Police Post at Chepkesin
To beefed up security and stem cattle rustling
between Baringo North Sub County and East
Pokot
Office and residential housing for the
officers.
Building and equipping the offices
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 234
Project Name
Objectives Targets Description of activities
Electricity Installation at
Loruk Police Station
Make working environment for the officers
comfortable
Instalation and wiring of the offices and
residential housing
Construction of Police
Station at Chemolingot
To beef up security for the county residents Office and residential housing for the
officers.
Building and equipping the offices and residents
for the officers
New Projects (MTP Consultations)
The MTP consultations identified security as a priority area that needed urgent attention.
Key Issue Proposed interventions Indicators Outcomes
Cattle rustling Short term Encourage free basic education including adult education;
More security officers to be posted to the county;
Better equipment to the security agencies;
Embrace community policing;
Introduce hotspot reporting centres;
Motor vehicles for security forces
Medium term
Build more Security posts stations;
Construct Security roads in the county;
Introduce technology in tracking bandits;
Establish a police division in each Sub County; & a police station at each
administrative location;
Allocate funds for community policing;
Housing at Mochongoi, Makutani in kinyang; and at each DO offices;
Rehabilitate existing houses at Kabarnet, Loruk & Kinyach;
Timely disbursement of funds;
Forensic laboratory the county.
Rates of crime;
Number of bandits arrested;
Number of security officer
deployed in the county;
Equipments assigned to the
security forces.;
Community policing
committee in place;
Hotspot centeres
Lower number of criminals arrested;
Establish more police divisions and
stations;
Enhance community policing;
Provide proper housing for police
officers;
Available funds for capacity building;
Established Forensic laboratory at the
county level and sub- labs at the
divisional level;
Purchase dmotor vehicles;
Install ICT in offices
Access to Justice Short Term
Allocate funds for establishments of state law office
Amount of funds allocated
to law and order
High court established;
State law office established in the
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 235
Key Issue Proposed interventions Indicators Outcomes
Long Term
Establish state law offices at the county level;
DPP to have a prosecutor in each court;
Have a high court at the county and sub-ordinate courts in each Sub
County
Establish mobile courts;
Enhance the use of Alternative Dispute Resolutions;
Provide adequate staff and transport facilities to each court;
department;
Establishment of conflict
resolution committee;
county; More security personnel
deployed to the county;
Weak aftercare and
Victim support
services
Provide after care support for released offenders (reintegration);
Mainstreaming the concerns of the victims;
Decentralize services to the Sub Counties and staffing;
Setting up of location case committees
Counselling and compensation to victims;
Enhance community service orders.
Allocate funds to these activities
Amount of fund allocated
Correctional services
Expansion of correctional services to the Sub County level;
Upgrade the main prison to remand all offenders;
Improve housing for prisons warders;
Enhance security at the prisons e.g. install CCTV and stable power;
Employ more staff;
Encourage community involvement in supervision and rehabilitation of
offenders;
Increase funding for social investigation;
Establish rehabilitation centres;
Empower offenders with skills;
Allocate funds to these activities
Corruption and
governance
Establish an Ethics and Anti-Corruption office at the county level;
Set up community anti-corruption committees;
Establishment of Administration of Justice office at the county;
Illicit brews
consumption
Increase the number of security personnel Amounts of illicit brews
captured
Number of security
Amounts of illicit brews captured
Number of security personnel deployed
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 236
Key Issue Proposed interventions Indicators Outcomes
personnel deployed
Social-cultural
practices
Initiate alternative rites of passage to alleviate FGM Number of reported cases of
FGM
Number of alternative rites
of passage held each year
Number of reported cases of FGM
Number of alternative rites of passage
held each year
Land related
conflicts/cases
Speed and fairly dispense of land related cases Number of households
possessing title deeds
Number of households possessing title
deeds
11.10.2. Proposed Projects
Project Name
Objectives Targets Description of activities
Construction of one magistrate court per
sub county
To provide accessible judicial services to the
residents of Baringo
6 magistrate's courts Design, construction, gazzetement, equip
and staffing
Construction of Chief's Office To provide accessible administration services 12 Chief's offices Design, construction, equip and staffing
Construction of AP and regular police
post
To provide accessible security services 12 police and AP posts Design, construction, equip and staffing
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 237
11.10.3. Strategies to Mainstream Cross-cutting Issues
In collaboration with other stakeholders, the sector will engage in initiatives to address
specific needs and vulnerability of children through OVC-CT programme. This will
endeavour to mitigate the OVC from the impact of HIV/AIDS menace. The state has duty to
provide access to protection and basic services, including legal aid and alternative care
mechanisms to children within a human rights framework.
The sector will work closely with other stakeholders on efforts to improve on the quality of
life through mainstreaming HIV and AIDS issues in their operations, engaging in behavior
change communication, protection of rights and access to justice for infected people and
others. The government has established HIV and AIDS control units in all ministries and
departments. However effective function of these units requires full support and facilitation
in terms of equipping them with necessary physical and human resources and efficient
coordination. The strategies of the sector will help to achieve the targets of MDG goal 6
which aims to combat HIV and AIDS, malaria and other diseases.
11.11. Finance and Economic Planning
Sector Vision and mission
Vision
A leading sector in legislation, public policy formulation, coordination, supervision and
prudent resource management.
Mission
Provide overall leadership and policy direction in resource mobilisation, management and
accountability for quality public service delivery.
Situation Analysis
The presence of sub-county treasury and planning units sets ground for utilization of County
Government resources. Operational financial institutions and devolved funds e.g. Youth and
Women Funds, CDF are critical in realizing funding mechanisms. Existing planning and
financial legislations e.g County Government Act 2012 and County Govt Public Finance
Management Transition Act 2013 will guide the impelementation of the Plan.
Inadequate public participation in planning and implementation require strengthening. Weak
linkage between development planning and budgetary allocatioon will also be addressed.
Establishment of economic and budget forum, harnessing public private partnership,public
participation will go along way in realizing the county vision
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 238
Role of Stakeholders
Name of Stakeholders Roles
County government departments-finance, planning,
public service
Provide leadership in resource mobilization, programme planning and implementation
County assembly and county executive Promoting quality policy, legislation, checks and controls
Donors and international community Addressing and supporting county government efforts in development
Private sector Harness community initiatives and social investments
Civil societies and public benefit organizations Build governance and institutional capacity at grassroots
Research and learning institutions Training, research and documentation
Local communities To help in Identifying Community empowerment and development of project proposals
National government Assist in the development of policy, budgetary allocations, planning guidelines and implementation of financial
regulations
11.11.1. Issues, Causes and proposed interventions in the Sub Sector
Subsector Issues
Causes Development
Objectives
Immediate
Objectives
Proposed Intervention
Planning and
development
Inadequate community
involvement in the
planning process
Poor representation of
the community
Low levels of
awareness on planning
processes among the
communities
To ensure participatory
and inclusive planning
processes
To have operational
communication
/consultation platforms at
various administrative
levels
Establishment of
communication/consultation platforms
down to the village level
Community participation in
programme/project management
Poor collaboration
among various
development agents
Poor reference to
existing plans
Disjointed funding and
implementation
frameworks
To ensure harmony and
linkages between
existing plans, funding
and programme
implementation
Consolidation of county
development plans and
their periodic
reviews(integrate, spatial,
sectoral and town plans)
Establishment of development
coordination units at county and lower
administrative levels
Finance Inadequate revenue
collection and budget
allocations
Limited sources of
revenue. Unexploited
revenue sources
inefficiencies in
revenue collection and
expenditure
To maximise on
revenue collection and
balanced budget
allocation
To explore new sources of
revenue
To enhance efficiency and
effectiveness in county
revenue collection and
expenditure
Legislations governing the management of
county finances
Implementation and enforcement of
existing county financial legislations
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 239
Subsector Issues
Causes Development
Objectives
Immediate
Objectives
Proposed Intervention
Delays in disbursement
of funds at county and
national levels
Bureaucratic financial
processes and
requirements
To offer timely and
efficient county
financial services
Constant consultation and
communication by relevant
stakeholders
Development of a service charter
Review of existing legislations to ease the
disbursement process
Adoption on technology in financial
management
Decentralization of county treasuries to the
sub-counties
Inadequate capacity to
handle budgeting
process
Inexperience on
transitional provisions
To have focused
budget and budget
processes
To have competent
personnel to handle
budgeting processes
Capacity building of staff
Adhering to the budget process timelines
and legislations
Lengthy tendering,
purchasing and supply
chain
Complex procurement
procedures
Enhance efficiency in
supply chain
management
To offer timely
procurement services
Review of existing procurement
legislations.
Functional procurement plans by various
entities.
Adoption on technology in supply chain
management.
Ongoing projects
Programme/Project Name Location
/Sub-County
/ Ward
Objectives Targets Description of activities
Community empowerment-
through CEISP
County wide Increase efficiency and
developmental impact of
devolved funds
% increase and growth of
annual revenue
Increasing public participation and voice of
the poorest members of the local
communities
East Pokot and Marigat Sub
County Information and
Documentation Centres
East Pokot and Marigat
sub counties
To strength planning unit and
community empowerment
Two operational
Information and
Documentation Centers
Construction, equipping, stocking, staffing
and community capacity building
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 240
New projects
Project Name Priority
Ranking
Location
/Level
Objectives Targets to be
met
Description of Activities Sources of Funds
Public Participation 2 Countywide To entrench public
participation in county
governance
30 wards Quarterly ward fora
Dissemination of
planning and policy
documents
Quarterly county
bulletins
County government
and Donors
Resource Mobilisation 1 County Increase county revenue for
programmes and projects
85B Investments fora
Resource mapping
Donor liaison
Trade fairs
Public Private
Partnerships
County Government
Planning units 5 County wide To ensure harmony and
linkages between existing
plans, funding and
programme implementation
1 sub county
30 wards
Plan annual reviews
Cross sectors main
streaming
Establish offices at ward
levels
staffing at ward levels
Donors and County
Government
Integrated Financial
Management Information
System (IFMIS)
3 County wide To enhance efficient
financial services
sub counties Establish treasuries
Equipping
Staffing
County Government
Integrated Monitoring
and Evaluation Unit
1 Sub Counties Tracking programme and
project results/trends
Sub Counties Capacity building
Feasibility studies
Field Visits
Reporting
Purchase of six four
wheel vehicles
Donors and County
Government
Community 6 Countywide Increase efficiency and wards Capacity building on the Donors and county
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 241
Project Name Priority
Ranking
Location
/Level
Objectives Targets to be
met
Description of Activities Sources of Funds
empowerment development impact of
devolved funds
local communities
Community access to
information development
projects
government
Procurement of ICT
materials, infrastructure
and equipment
3 Countywide To increase efficiency in
service delivery
To create a platform for
service delivery
County HQ
Subcounties and
Wards
Purchase of ICT
materials
County Goverment
GOK
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 242
Chapter Twelve
Monitoring and Evaluation Framework 12.1.Introduction
This chapter presents the monitoring and evaluation framework that will be used at the
National and County level to track progress on implementation of projects and programmes.
An indicative matrix detailing projects and programmes then costing implementing agencies
as well as monitoring tools and indicators which could be selected for the County, based on
projects and programmes identified in chapter three, is given as Appendix II.
12.2. Institutional Framework for Monitoring and Evaluation
At the National level, Monitoring and Evaluation is conducted through National Integrated
Monitoring and Evaluation System (NIMES), whose main aim is to improve the effectiveness
and quality of tracking of implementation of various development policies, strategies and
programmes. The county and lower level monitoring and evaluation of projects and
programmes are part of this system.
Baringo County will put in place a County Monitoring and Evaluation system to serve the
needs of the County Government, while complementing the National M&E system. The
system will take cognizance of the projects and programmes included in the County
Integrated Development Plans as well as indicators facilitating the MTEF process, and
development aspects of the respective county.
An indicative M&E impact /performance indicators is presented in below.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 243
Health Sector
Project Name Cost
Estimate
(KSH)
Time
Frame M &E
Indicators
M&E
Tools
Implementing
Agency
Source of funds Implementation Status
Completion and equipping of
all stalled and Continuing
Health Facilities in all
Constituencies in the County( 42)
260M
2013-2017 No. of Fully
operational
health facilities
Site
visiting
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
Stalled
Upgrade
Medical Training Center at
Baringo County Referral
70M 2013-2017 An upgraded
MTC
Site
visiting
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
New
Establishment of sub-county
hospitals by Development and
upgrading of the level two III
hospitals to level IV specialist
hospitals
in each Sub-County
500M 2013-2017 No. of level iv
hospitals
Site
visiting
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
New
Upgrade of level II Health Centres
to level III health Facilities(Sub-
district). 2 per sub county
600M 2013-2017 No. of level iii
Hospitals
Site
visiting
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
New
Upgrade of 2 level I dispensaries
to level II health facility per ward
2.4 B 2013-2017 No. of level
hospitals per
ward
Site
visiting
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
New
Construction of 1 level I health
facility (Dispensary) per Ward.
1.5B 2013-2017 No. of
dispensaries
constructed
Site Visits
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt.
New
Construction of modern public
toilets in major towns
48M 2013-2017 No. of modern
public toilets
Site visits
Reports
County Govt.
Baringo
County Govt. Of Baringo
National Govt., Donors
Proposed/New
Supply of drugs and vacinnes to
182 health facilities
1.2B 2013-2017 No.of health
centres supplied
Store
ledger
County Govt.
Baringo
County Govt,national
government,donors
Ongoing
Construction/Expansion of
mortuary per Sub-County and
cemetry
192M 2013-2017 No. of
mortuaries
No of cemetries
Site visits
Reports
BCG County Govt. Of Baringo
National Govt., Donors
New/Ongoing
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 244
Agriculture, Livestock and Fisheries Sector
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
Livestock Upgrading
Program
200M 2013-2017 No. of Livestock
program in place
No. of upgraded
livestock
Increased milk and
meat production
No. of research
conducted
Reports
Site visits
County Govt.
Baringo
County Govt. Of
Baringo National
Govt.
New
Milk processing plant
50,000 litres per day
200M 2013-2017 Processing plant
constructed
Completion
certificate
County Govt.
Baringo
County Govt.National
government and
Donors
New
Disease control and
clinical services
100M 2013-2017 No. of livestock
vaccinated
No.of trainings held
No.of livestock
accessing cattle
dips
Reports,
Site visits
County Govt.
Baringo
County Govt. Of
Baringo National
Govt.Partners
New/Ongoing
Hides and skins
improvement and leather
development
10M 2013-2017 No. of trainings
held
Reports County Govt.
Baringo
County Govt. Of
Baringo,donors
New
Cattle branding 20 M 2013-2017 No. of animals
branded
Reports County Govt. of
Baringo
County Govt, Ongoing
Construction of livestock
yard
6M 2013-2017 No. of yards
constructed
Completion
Certificate
County Govt.
Baringo
County Govt. of
Baringo
New
Construction of one
international slaughter
houses
240M 2013-2017 No. of slaughter
house constructed
Completion
certificate
CGB CGB,Partner ,
National government
New
Construction and
rehabilitation of 46
slaughter houses
400M 2013-2017 No. of slaughter
houses constructed
and rehabilitated,
Completion
certificate
CGB CGB,Partner,
New/Ongoing
Establishment of Fish
Farming
100M 2013-2017 No. of fish ponds
established
No. of pans and
dams stocked.
No.of trainings held
Site visiting
Reports
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 245
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
Revival of 43 stalled Cattle
dips and operationalisation
of existing ones
8.6M 2013-2017 No. of cattle dips in
operation
Site visiting
Reports
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
Stalled
Construction of 1 new
cattle dip per ward.
27M 2013-2017 No. of cattle dips
per ward
constructed.
Site visiting
Reports
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
BeeKeeping/Farming
project
200M 2013-2017 No. of trainings
held and beehives
installed
Site visiting
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
Expansion and
Establisment of Irrigation
Schemes
1.2B 2013-2017 Increased food
production
Site visiting
Reports
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
Provision of farm inputs 500M 2013-2017 No. of farmers
accessing the inputs
Reports County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
Promotion of the
Cooperative movement
1.5B 2013-2017 No. of cooperatives
form, No of
trainings held,
No of cooperative
doing value
addition
Site visiting
Reports
County Govt.
Baringo
County Govt. Of
Baringo
National Govt.
New
Constructionof meat
Processing Plant at
Kimalel in Marigat
100M 2013-2017 Meat processing
factory
Site visiting
Reports
County
Government of.
Baringo
County Govt. Of
Baringo
National Govt.
New
Construction to
Completion of a Tannery
at Mogotio
50M 2013-2013 Hides and Skins
processing
Site visits
Reports
County
Government of.
Baringo
County Government
of. Baringo
Ongoing
Construction of 3 Cereal
Stores at Mogotio,
Mochongoi and
Kabartonjo
150M 2013-2017 Number of cereal
stores constructed
Site visits County
Government of.
Baringo
County Govt. Of
Baringo
National Govt
New
Fresh produce cooler
facility
100M 2013-2017 No of coolers
purchased
Delivery notes CGB County Govt. Of
Baringo
National
Govt,Partners
New
Green houses and 60M 2013-2017 No.of green houses Reports and CGB County Govt. Of New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 246
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
demonstrations
(horticulture)
purchased,No of
farmers trained
site visits Baringo
National
Govt,Partners
Water-harvesting for food
security projects.
40M 2013-2017 No. of water pans
constructed
No.of trainings held
Completion
certificate and
site visits
CGB County Govt. Of
Baringo
National
Govt,Partners
Ongoing
Orphan crops development
programme
5M 2013-2017 No of groups
benefited
Reports CGB CGB and partners New
NjaaMarufuku Kenya-
county wide
15M 2013-2017 No of groups
funded,No of
training held
Reports and
field visits
CGB CGB and partners Ongoing
Cotton production-ASAL;
Salawa, Sacho, Kimose
and Tenges
10M 2013-2017 No of trainings
held, acreage under
cultivation
Reports,
field visits
CGB CGB and partners Ongoing/New
Traditional high value
crops seed development-
ASAL
10M 2013-2017 No of trainings
held, acreage under
cultivation
Reports,
field visits
CGB CGB and partners New
Enhance Research-
Extension- Farmer
Linkages
200M 2013-2017 No of research held Reports CGB CGB,National Govt.
and partners
Ongoing
Construction of Livestock
Sales Yards at Marigat, Kolowa, Salawa, Kinyach, Kaptara, Kasitet, Amaya, Tangulbei, Kapcholoi, Emining, Kibotany, Kaben
28M 2013-2017 14 livestock yards Site visit GOK, CGB&
Donors
County
Govt/Donors/National
Govt
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 247
EducationSector
Project Name Cost
Estimate
(KSh.)
Time
Frame
Monitoring
Indicators
Monitoring Tools Implementing Agency Source of funds Implementation
Status
Construction of 372 ECDE
Centres in primary schools
in Baringo County
850 M 2013-2017 Number of ECDE
centres constructed
primary schools
Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/ donors/
GOK
New and ongoing
Construction of 4 new
ECDE Centres per sub
county
360 M 2013-2017 120 new ECDE
schools
Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Construction of 3 and
Upgrading of 12youth
polytechnics in the county
450M 2013-2017 15Youth
Polytechnic
Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Construction of 1
Community Resource
Centre per ward
300M 2013-2017 No ofresource
centres established,
Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Establishment of one
Integrated Special school
per sub
county/Constituency
180M 2013-2017 6 (Six) Integrated
Schools
site visits/Reports County Government of
Baringo/ National
Government.
County
Government of
Baringo/donors
New
Setting up a County
Bursary, Scholarship Fund
250M 2013-2017 Bursary/Scholarship
fund Established
Conduct site
visits/Reports
County Government of
Baringo/National
Government
County
Government of
Baringo/donors
New
Construction of 24 primary
school classrooms/
infrastructure per ward in
Baringo county
1.1B 2013-2017 720 Classrooms Conduct site
visits/Reports
County Government of
Baringo/National
Government
National
Government
/donors
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 248
Project Name Cost
Estimate
(KSh.)
Time
Frame
Monitoring
Indicators
Monitoring Tools Implementing Agency Source of funds Implementation
Status
Construction of 12
secondary school
classrooms/infrastructure
per ward in Baringo
County.
504M 2013-2017 360 classrooms Conduct site
visits/Reports
County Government of
Baringo/National
Government.
National
Government/donors
New
Construction of all
incomplete schools as
reflected in Annex of
projects.
500M 2013-2017 All incomplete
schools
Conduct site
visits/Reports
County Government of
Baringo
National
Government/donors
Ongoing
Establishment/Construction
of Baringo ECDE college
100M 2013-2017 One ECDE College Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Establishment of three
adult education/home craft
centres per ward
180M 2013-2017 90 Education
Centres
Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Eletrification of all primary
schools
20M 2013-2017 400 Schools Conduct site
visits/Reports
County Government of
Baringo
County
Government of
Baringo/donors
New
Employment of ECDE
teachers
800M 2013-2017 1200 ECDE
teachers
Reports County Government of
Baringo
County
Government of
Baringo
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 249
Governance, Justice, Law and Order Sector
Environment, Water, Irrigationand Sanitation Sector
Project Name Cost
Estimate
(KES.)
Time
Frame Monitoring Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Drilling and Equiping of
171 boreholes
1.2B
2013-2017 No of boreholes drilled and equipped
No. of people accessing piped/potable
water
Site visit
Progress
report
GOK, BCG &
Donors
County Govt/donors New/ongoing
Construction of four
Masonary tanks per sub-
county 200M3
60M 2013-2017 No.of tanks constructed and connected
to water
Site visit GOK, BCG &
Donors
County Govt/donors New
Construction of two water
pans/dams per ward per
year
1.5B 2013-2017 No of waterpans constructed in five
years
Number of people and livestock
accessing water
Site visit GOK, BCG &
Donors
County Govt/donors New
Protection of 20 water
springs across the county
as listed in the Annex 4
40M 2013-2017 No of Protected Water Springs Site visit,
Reports
GOK, BCG &
Donors
County Govt/donors New
Project Name Cost
Estimate
(KSh.)
Time Frame
Monitoring Indicators
Monitoring
Tools
Implementing
Agency
Source of
funds
Implementation
Status
Construction of one magistrate court per
sub county
90M 2013-2017 Noof Magistrate courts
Site visit The Judiciary Judiciary &
County Govt
New
Construction of Chief's Office 12 M 2013 – 2017 No ofChief's office Site visit GOK & BCG County&
National Govt
New
Construction of Adminstation Police and
Regular Police post
200M 2013-2017 No of regular police and
AP posts
Site visit GOK, BCG County&
National Govt
New
Construction of prisons/cells 150M 2013-2017 No.of prisons/cells
constructed
Site visits GOK,BCG County &
National Govt
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 250
Project Name Cost
Estimate
(KES.)
Time
Frame Monitoring Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Desiliting of 55 dams and
pans as listed in the Annex
4
200M 2013-2017 No of Desilted water dams/pans Site visit,
Reports
GOK, BCG &
Donors
County Govt/donors New
Construction of model tree
nursery one per sub-county
30M 2013-2017 No of Operational tree Nurseries Site visit GOK, BCG &
Donors
County Govt/donors New
Soil erosion control 100M 2013-2017 Size of area protected Site visit GOK, BCG &
Donors
County Govt/donors New
Establishment of Sewerage
system within Major towns
25B 2013-2017 No. Sewerage established Reports GOK,BCG,&
Donors
GOK,BCG,&
Donors
New
Improve Charcoal
production methods
20M 2013-2017 No of trainings held on charcoal
production.
Site visit GOK, BCG &
Donors
County Govt/donors New
Environment protection 100M 2013-2017 No of seedlings planted/acerage
reclaimed
Reports/Site
visits
BCG/Doners/Central
Government/Private
sector
BCG/Doners/Central
Government/Private
sector
Ongoing/New
Chemususu dam 3B 2013-2017 No of household accessing piped water Reports GOK, BCG &
Donors
GOK,BCG,&
Donors
Ongoing
Ground Catchment
Rainwater Harvesting
structures
100M 2013-2017 No of runoff constructed Reports CGB GOK,CGB,&
Donors
Ongoing
Water supply systems to
households
7B 2013-2017 No of household connected with piped
water
Reports,
site visits
CGB GOK,CGB,&
Donors
Ongoing
Development of dump
sites
30M 2013-2017 No of dump sites developed Reports
Completion
certificate
CGB GOK,CGB,&
Donors
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 251
Project Name Cost
Estimate
(KES.)
Time
Frame Monitoring Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Construction of check
dams
20M 2013-2017 No of check dams constructed Reports CGB GOK,CGB &
Donors
New
Carbon Credit Grading 5M 2013-2014 Percentage of carbon credit returns to
the county
Carbon credit
report
CGB GOK/CGB&
Donors/Companies
New
General Economics, Industrialization, Commerce, Tourism and Enterprise Development.
Project Name Cost
Estimate
(KSh.)
Time Frame Monitoring
Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Tourism
Development of the Tourism Sector
Plan and Site Management Plans for
all key tourism facilities
10M 2013-2017 Development
Sector Plan
Report on the
plan
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Reclaimation of Lake Kapnarok Game
Reserve
400M 2013-2017 Area
reclaimed
Number of
tourists
Site vits &
repports
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Development of Niche Products and
Services
30M 2013-2017 Identify &
establish
Niche
products
Report on the
products
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Asset Preservation and Conservation 5M 2013-2017 Preservation
of
conservation
areas
Site visit &
reports
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Capacity Development 10M 2013-2017 Carry out a
survey
Reports & site
visits
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 252
Project Name Cost
Estimate
(KSh.)
Time Frame Monitoring
Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Expansion of the Tourist Information
Centre at Mogotio
10M 2013-2017
Building
Site visit GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Establishment of Touristic
Monuments and Cultural
Development Centres in each sub
county
36M 2013-2017 6 monuments
& cultural
centres
Site visit GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Acquisition of Courtesy Buses
50M 2013-2017
5buses
Site visit GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
County Branding
50M 2013-2017 County
profiles
Reports GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Livelihood Projects
20M 2013-2017 Reduced
conflicts &
improved
standards of
living
Site visit &
reports
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Markets, JuaKali Sheds and Livestock
Auction Yards one per ward
500M 2013-2017
Sheds & yards
Site visit GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Upgrading of the Barwessa,
Kabartonjo, Chemolingot, Nginyang,
Marigat, Mochongoi, Mogotio,
Torongo, Emening, Eldama Ravine,
Mogorwo, Kabarnet and Oinomoi
Markets
26M 2013-2017
13 markets
Site visit GOK,
CGB&Donors
County Govt/Donors/National
Govt
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 253
Project Name Cost
Estimate
(KSh.)
Time Frame Monitoring
Indicators
Monitoring
Tools
Implementing
Agency
Source of funds Implementation
Status
Construction of 2 Jua Kali / Industrial
Sheds at each subcounty
120M 2013-2017
12 industrial
sheds
Site visit GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Joint Trade Loans Programme
in the whole county
60M 2013-2017 Availability of
trade loans
Report & Site
visit
GOK, CGB&
Donors
County Govt/Donors/National
Govt
New
Industrial Investment
Joint PPP Investment in 2 Value
Addition Factories per Sub-County
through BIC with local cooperatives /
investors
2.4B 2013-2017
12 joint PPP
Report Site
visit
GOK, CGB&
Donors
County Govt/National
Govt/Private Sector
New
Development of Minerals Resource
Map
10M 2013-2017 1 resource
map
established
Report GOK, CGB&
Donors
County& National Govt New
Energy, Transport, Infrastructure and ICT
Project Name Cost Estimate (KSh.) Time Frame Monitoring
Indicators
Monitoring Tools Implementing
Agency
Source of funds Implementation
Status
Construction of
Urban Roads
200M 2013-2017 50 KM of
road
constructed
Report& Site visit GOK, CGB&
Donors
County
Government/National
Govt/Donors
New
Construction of
Gravel Roads
600M 2013-2017 600 KM of
gravel
constructed
Report &Site visit GOK, CGB&
Donors
County
Government/National
Govt/Donors
New
Construction of Earth
Roads and
2.4B 2013-2017 1200 KM of
earth road
report &Site visit GOK, CGB &
Donors
County
Government/National
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 254
Project Name Cost Estimate (KSh.) Time Frame Monitoring
Indicators
Monitoring Tools Implementing
Agency
Source of funds Implementation
Status
Footbridges constructed Govt/Donors
Development and
rehabilation of Air
Strips
600m 2013-2017 Lenght of
run way
constructed
and fenced
report &Site visit GOK,CGB&
Donors
County
Govt/Donors/National
Govt
New
Ongoing
Establishment of ICT
Centres
120M 2013-2017
Development of
Geographical
Information
System[GIS]
50M 2013-2017
Automation of
County Government
processes and
services
30M 2013-2017
Digitization of
County Government
documents
50M 2013-2017
Establishment of
Communication
Masts
2013-2017 PPP/BCG
Solarenergy
exploration
30,M 2013-2017
Rural Electrification 1B 2013-2017 Rural
Electrification
Authority/BCG
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 255
Land, Housing, Public Worksand Urban Development Project Name Cost
Estimat
e (Ksh.)
Time
Frame
Monitoring
Indicators
Monitoring
Tools
Implementing
Agency
Sources of funds Implementat
ion Status
Development of 50 High
Grade Housing for Civil
Servants Housing
Scheme
200M 2013-2017
Number of HGH
constructed
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/Private
sector/National
Government/Donors
New
Development of 75
Medium Grade Housing
for Civil servants
225M 2013-2017
Number of MGH
constructed
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/Private
sector/National
Government/Donors
New
Development of 100
Low Grade Houses for
civil servants
250M 2013-2017
Number of LGH
constructed
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/Private
sector/National
Government/Donors
New
Slum upgrading in Urban
Centres
100M 2013-2017
Number of slums
upgraded
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/Private
sector/National
Government/Donors
New
Construction of county
lands office
20M 2013-2017
County Lands
office constructed
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/National
Government/Donors
New
Development of spatial
plan
160M 2013-2017
County Spatial
Plan
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/National
Government/Donors
New
Urban physical
surveying and
Development
60M 2013-2017
Number of Urban
physical plans
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/National
Government/Donors
New
Land demarcation/ Land
Adjudication and
Registration
50M 2013-2017
Number of title
deeds issued and
number of lands
registers
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/National
Government/Donors
New
Rehabilitation of county
housing facilities
100M 2013-2017
Number of houses
rehabilitated
Work plans/Site visit
meeting and reports
CGB and Private
sector
CGB/National
Government/Donors
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 256
Finance and Planning Sector
Project Name Objective Actual Sub
County/
Ward
Project
cost
(Kshs.)
Source of Funds Time
Frame
Implementing
Agency (ies)
Monitoring
Indicators
Means of
Verification
Implementation
Status
Public Participation To entrench
public
participation in
county
governance
Countywide 65M CGB/National
Government
2013-2017 Planning and
finance
Civil societies
Private sector
Number of
fora
Number of
bulletins
issues
Registers,
reports
Filed copies
Ongoing
Resource Mobilisation Increase county
revenue for
programmes and
projects
County 50M County Government
2013-2017 Planning and
finance
Donors
Research and
learning
institutions
Number of
fora, reports,
No. of trade
fairs and No.
of partnership
engagements
Registers,
reports,
records,
agreements
and contracts
Ongoing
Planning units To ensure
harmony and
linkages between
existing plans,
funding and
programme
implementation
County wide 150M Donors and County
Government
2013-2017 Planning and
finance
No. of review
meetings, No.
reports
No. of offices
No. of staff
Review
reports,
completion
certificate
staff returns
and
performance
contracts
Ongoing
Integrated Financial
Management
Information System
To enhance
efficient financial
services
County wide 30 M County
Government/Donors
2013-2017 Planning and
finance
Donors
No. of
treasuries
established,
staffed and
equipped
Operation
levels, ICT
levels, staff
returns and
performance
contracts
Ongoing
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 257
Project Name Objective Actual Sub
County/
Ward
Project
cost
(Kshs.)
Source of Funds Time
Frame
Implementing
Agency (ies)
Monitoring
Indicators
Means of
Verification
Implementation
Status
Integrated Monitoring
and Evaluation Unit
Tracking
programme and
project
results/trends
Sub Counties 135 M Donors and County
Government
2013-2017 Planning and
finance
Donors
Private sector
Civil societies
No. of fora,
No. of
feasibility and
field reports
No of vehicles
purchased
Registers,
records, case
studies and
reports
Ongoing
Community
empowerment
Increase
efficiency and
development
impact of
devolved funds
County 60M Donors and county
Govt and GOK
2013-2017 Finance and
planning Donors
Community
No of
trainings
Attendant
registers and
reports
Ongoing
Procurement of ICT
materials, infrastructure
and equipment
To increase
efficiency in
service delivery
To create a
platform for
service delivery
County 200M County Govt, GOK,,
Donors
2013-2017 Finance and
planning
No of ICT
materials
procured
Reports Ongoing
Youth, Social Protection, Culture and Recreation
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
Youth Enterprise
Development fund Sub
County scheme
30M 2013-2017 No of youth groups
benefitted
Quarterly
Reports
County Govt
GOK
County Govt, GOK,
Donors, NGOS
Ongoing
Youth Enterprises
Development Funds
Financial intermediary
scheme
100M 2013-2017 No of youth benefited Quarterly
ReportsField
visits
County Govt
GOK
County Govt, GOK,
Donors, NGOS
Ongoing
Youth Polytechnic 300M 2013-2017 No of youth TrainedNo Reports County Govt County Govt, GOK, Ongoing
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 258
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
training programmes of equipment purchased GOK Donors, NGOS
Children‘s programmes 180M 2013-2017 No of meetings held.
No of children desk
created in police
stationsNo of OVC
supported
Minutes
No of cases
reported in
police station
Reports
County Govt
GOK
County Govt, GOK,
Donors, NGOS
Ongoing/New
Area Advisory Council 10M 2013-2017 No of meetings held.
Minutes
County Govt
NGOs
County Govt
NGOs
Ongoing
Youth Empowerment
Centres
(county wide)
300M 2013-2017 No of youth centres
constructed and equiped
Reports County Govt
GOK, Donors, NGOs
County Govt
GOK, Donors, NGOs
Ongoing/New
Women Enterprise
Development Fund
60M 2013-2017 No of women groups
funded
Reports GOK, County Govt
County Govt
GOK, Donors, NGOs
Ongoing
PWSD –CT Program 201M 2013-2017 No of PWSD-CT
benefited
Reports GOK, County Govt
Donors, NGOs
GOK, County Govt
Donors, NGOs
Ongoing
Cash transfer for the
Older persons (65 yrs
and above)
540M 2013-2017 No of beneficiaries Reports GOK, County Govt
Donors, NGOs
GOK, County Govt
Donors, NGOs
Ongoing
Grants to Community
initiatives
36M 2013-2017 No of groups benefited Reports
Field visits
County Govt
County Govt
New
Formation of Technical
committee/sub-counties
and county
1.8M 2013-2017 No of meetings Minute GOK, County Govt
Donors, NGOs
GOK, County Govt
Donors, NGOs
Ongoing
Capacity building 12M 2013-2017 No of trainings held Reports GOK, County Govt
Donors, NGOs
GOK, County Govt
Donors, NGOs
Ongoing
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 259
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
Construction of dining
hall and general
refurbishment at CCSP
Marigat
30M 2013-2017 No of Dining Halls Field Visit
Photographs
GOK, County Govt
Donors, NGOs
GOK, County Govt
Donors, NGOs
Ongoing
Construction and
Equipping of sub-county
Gender and Social Dev.
Offices at Marigat, East
Pokot, Baringo North
and Mogotio
66M 2013-2017 No of offices built Completion
certificate
Photographs
GOK, County Govt
GOK, County Govt
New
Refurbishment of
houses, road repair, rain
water harvesting at
Kabarnet V/R Centre
36M 2013-2017 No of refurbished
houses
Site reports,
pictures
GOK, County Govt
GOK, County Govt
New
Establishment of cultural
Centres
22.5M 2013-2017 No of cultural centres
established
Completion
certificates,
Field reports
GOK, County Govt
GOK, County Govt
Ongoing
Conservation and
preservation of cultural
sites
12M 2013-2017 No of cultural sites Fields Reports County Govt
County Govt
Ongoing
Upgrading of Kabarnet
Stadium to 10,000 seater
National stadia Board
standard and construct
an athletics camp therein
and other Stadias
500M 2013-2017 No offully operational
stadium
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Upgrading to completion
Sirwa Sports Training
Camp
100M 2013-2017 No of operational
Training Camps
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
Ongoing
Construction of one
youth Empowerment
60M 2013-2017 No of Youth
Empowerment Centres
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 260
Project Name Cost Estimate
(KSH)
Time
Frame M &E Indicators
M&E Tools Implementing
Agency
Source of funds Implementation
Status
Centre per sub county
Establishment of one
children's home per sub
county
120M 2013-2017 No of Operational
Children's home.
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Improvement of 1 sports
facilitiesper sub county
60M 2013-2017 No sports facilities
repaired
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Establishment of a
County Youth Enterprise
Fund
120M 2013-2017 No of beneficiaries Report GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Establishment of 1
Social Halls per Sub-
County
60M 2013-2014 Noof Social Halls
constructed
Site visits and
Reports
CGB & Donors Govt/ County
Govt/Donors
New
Establishment of a
County Women
Enterprise Fund
120M 2013-2017 No of women receiving
loans
Report GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Construction of a
Disaster Response
Centre in Kabarnet with
satelites in Chemolingot
and Marigat
100M 2013-2017 No of disaster response
centers.
Report & Site
visit
GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
Construction of
SixPublic Cemeteries
12M 2013-2017 No of public cemeteries
rehabilitated
Site visit GOK, CGB & Donors Nat. Govt/ County
Govt/Donors
New
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 261
SUMMARIZED BUBGET FOR THE CIDP 2013-2017
SECTOR AMOUNT (KES in Billions)
Health 6.770
Education 5.638
Environment ,Water,Irrigation And Sanitation 38.405
General Economics,Industrilazation,Commerce,Trade,Tourism And Enterprise Development 3.737
Energy,Transport,Infrastructure And Ict 5.08
Land,Housing,Public Works And Urban Development 1.165
Agriculture,Livestock And Fisheries 13.871
Finance And Economic Planning 0.49
Youth,Social, Culture, And Recreation 3.1881
Governance,Justice Law And Order 0.452
Contingencies 4
TOTAL 82.7961
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 262
Annex I: The County Fact Sheet
The fact sheet presents a summary of key statistics that describe the county at a glance. Data
was derived from the Kenya National Bureau of Statistics reports as well as report from
various Government departments in the county and SIDC and other publications like Kenya
Integrated Household Budget Survey and Kenya Demographic Health Survey.
Information Category Statistics
County Area:
Total area(Km2) 11015.3
Water mass(Km2) 165
Gazetted Forests(ha) 65280.4
National Parks/Reserves(Km) 113.5
Arable land (ha) 1095
Non-arable land(ha) 9920.5
Total urban areas 6
No. of towns 6
Topography and climate
Lowest altitude (above the sea level) (m) 300
Highest 2400m
Temperature range: (00C)
High 47
Low 15
Rainfall:(mm)
High 1500
Low 600
Average relative humidity
Wind speed 4mph SE
Demographic profiles
Total Population (2012) 613,376
Total Male population 308,124
Total female population 305,252
Sex ratio 1:1
Projected population: 2
Mid plan period (2015) 677,209
End of 2017 723,411
Infant population:
Female 10,240
Male 10,834
Total 21,074
Population under five:
Female 59,234
Male 62,638
Total 121,872
Pre-school population (aged 3-5 years)
Female 1,6193
Male 1,7431
Total 33,624
Primary school age group (aged 6-13 years):
Female 76,709
Male 80,803
Total 157,513
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 263
Information Category Statistics
Secondary School age group (14 & 17):
Female 30,797
Male 33800
Total 64,598
Youths population (aged 15-29)
Female 84,242
Male 83,254
Total 167,497
Labour force:( aged 15-64)
Female 149,727
Male 146,202
Total 295,928
Reproductive age group (aged 15-49) 133,685
Aged group Female 10,240
Male 10,834
Total 21,074
Eligible voting population (aged 18 and above) Male 119,266,
Female 126144
Total Registered voters:
Male 87128
Female 84216
Total 171344
Urban Population (2012)
Female 30,373
Male 28,467
Total 58,840
Rural Population:(2012)
Female 274,879
Male 279,657
Total 554,526
Population density: 2012
Highest (Baringo Central 121
Lowest/least (East Pokot) 31;
County average 55
County National
Crude Birth rate 35/1000 38.4/1000
Crude Death rate 10.7/1000 10.4/1000
Infant Mortality rate (IMR) 58/1000) 54/1000
Neo-Natal Mortality Rate (NNMR) 31/1000
Post Neo-Natal Mortality Rate (PNNMR) 21/1000.
Maternal Mortality Rate (MMR) 375/100,000 495/100,000
Child Mortality Rate (CMR) 12/1000. 24/1000
Under Five Mortality Rate (U5MR) 70/1000. 79/1000
Life expectancy
Males
Females
54
59
58
61
Total number of households 11,0649 8,767,954
Average household size 5 4.4
Female headed households 10794 2,818,800
Children needing special protection:
Children in labour Not determined
Orphans Not determined
Physically disabled persons (No.) 6998.
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 264
Information Category Statistics
Distribution of Population by disability type (per
cent):
Missing: County National
Hand: 0.001
Foot: 0.005
Lame 0.854 0.249
Visual 0.790 0.141
Hearing 0.59 0.122
Speech 0.24 0.253
Physical 0.99 0.102
Mental 0.27 0.058
Self care
Other types of disabilities 0.19 0.075
Child- Headed households (per cent) 3
Poverty Indicators
Absolute poverty:
Percentage 58.5
Number 325,000
Contribution to national poverty 1.5
Urban poor:
Percentage 20
Number 30737
Rural poor:
Percentage 57.4
Number 318892
Food poverty:
Percentage 57
Number 316,669
Income per capita Not Determined
Sectoral contribution to household income (per cent):
Agriculture 80
Rural self-employment 15
Wage employment 18.9
Urban self-employment 22.4
Number employed per Sector:
Agriculture 372,225
Rural self-employment 102,743
Wage employment 95,352
Urban self-employment 65,800
Crop farming:
Average farm size (Small scale) 1.5ha
Average farm size (Large scale) 5ha
percentage of farmers with title deeds 35
Total acreage under food crops 9000 ha
Total acreage under cash crops 10 Ha
Total acreage under soil/land conservation 180,000ha
Total acreage under farm forestry Not determined
Total acreage under organic farming Not determined
Main storage facilities Granaries
Livestock farming:
Number of Ranches
Company ranches 0
Group ranches 2
Total 2
Average size of ranches 20986ha
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 265
Information Category Statistics
Main livestock bred East African Zebu, Goats, Dairy animals, pigs, sheep, Rabbits,
Camels.
Land carrying capacity 5
Total Number of Ranches 4
Beekeeping apiaries 1
Bee hives 176,880
Milk production:
Quantity litres per anum 6.1 million
Value Ksh. 12,200,000
Beef production:
Quantity kgs per anum 7.4million
Value Ksh. 22.2 m
Mutton Production:
Quantity (kgs per anum) 90,050 Kg
Value Ksh. 28.816m
Egg production:
Quantity (tons) 62000
Value (Ksh) 620,000
Poultry meat Production:
Quantity (kg) 35000
Value (Ksh) 10,500,000
Honey Production:
Quantity (kg) 51,000
Value (Ksh) 40.8m
Pork Production:
Quantity (kg) 51200
Value (Ksh) 17.92m
Fisheries production:
Fishermen (No.) 150
Fish farm families (No.) 150
Fish ponds 610
Area of fish ponds 184,000m2
Main species of fish catch:
Protopterous -lung fish (tonnes)
Tilapia
Clarias
154
12
27
Fishing Effort (hours) 4
Landing beaches (No.) 0
Fishing gear (No.):
Fishing nets: 900
Hooks: 190,000
Traps: 50
Motor Boats: 3
Dhows 0
Canoes 3
Fish harvest:
Weight (tons) 193
Value (Ksh) 11.8m
Wildlife Resources
Animal types Elephants, Buffaloes, Girraffes, Gazzelles, Leopards
Wildlife estates-private, Ruko Conservancy, Kuki Galmans Nature Conservancy, Mesori
Community Ostrich Farm,Kerubo Swamp, Kiborgoch, Tiongik
Nature Conservation, Ngenyin Community Conservation, Soy safari
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 266
Information Category Statistics
lodge, songol Ranch, KDA Chemeron Ostrich farm, salabani
secondary school chuine sanctuary, Equator tortoise park, Irong
conservancy, Temberewe Ostritich farm, Lembus chemogoch
Kaptuiya wildlife conservancy, michongoi community Nature
reserve Reserve, Lake Kichitit Wetland conservation and Lomoiwe
Game Nature
game management,( National parks/Reserves)
Indicate the total areas under Protected Areas
List any threatened species ( animals, birds etc) in
the county
Nature and frequency of human wildlife conflicts
No. of Park visitors per annum
No protected area.
No animals in national category is endangered species
Snake Bites and crocodile attacks on both human and livestock.
Not determined.
Not determined.
Staff of KWS, camps 4
Poaching control measures:
Indicate the number of poachers arrested
Indicate the number of firearms confiscated
Nil
-Nil
Forestry
List tree species of biodiversity importance
Rate of forest loss and main causes
Saddle wood, cedar, podo, prosopis juliflora, Eucaliptus saligna,
Grevillea Rabusta and Cupressus lusitanica
15 per cent causes are; human encroachment, charcoal burning,
poverty.
Number of gazetted forests 7
No. of Non-gazetted forests Not determined
Size of gazetted forests 65,280.4Ha
Main forest products & quantities Timber, firewood, poles, charcoal, honey.
No. of people engaged in forestry 12,000
Seedlings production
400,000
Farms engaged in farm forestry (plots) 104
Average no. of trees per farm 100
Non-timber forest products harvested (Ksh) 10m
Community Forest Associations (CFA) established 4
Quantity of timber produced (000,000) 6m
ENVIRONMENT
Pollution
main type of pollution and their sources
EIAs endorsed (No.)
Noise
I51
Environment Audits executed: 51
Solid waste management
Quantity of solid waste (tons p.a)
Sources of solid waste
Indicate numbers per location
Garbage and human waste
10,950
Towns, Markets and Residential areas
Hill tops and slopes and mountain areas protected: Nil
Rivers, lakes and wetlands protected:
Total freshwater available
Distribution of water uses according to main water
users
No. of Water Resource Users Associations
No. of water permits per category
No. of rivers with environmental flows
Not determined
Not determined
7
Not determined
380
0
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 267
Information Category Statistics
No. of ground water sources
Proportion of house with roof catchment
400
0
Number of quarry sites renovated: 0
Mines, mineral, Quarrying and estimate quantities
Mining activities:
Mineral Type 0
Lifespan N/A
Quarrying:
Sand Not determined
Ballast Not determined
Murram/gravel Not determined
Hardcore Not determined
No. of people involved Not determined
Cooperatives
No. of cooperative societies 71
Active cooperative societies 71
Dormant cooperative societies 31
Collapsed societies (No.) N/A
Total Registered membership 42264
Total turn-over (Ksh) 696,560,545
Health
Number of health posts:
Hospitals (Public)
Provincial Nil
County 1
Sub-county 4
Hospitals (Mission/NGO) 1
Hospitals (Private) 1
Nursing homes (Private) Nil
Health centres (Public) 19
Health centres (Private) 0
Dispensaries (Public) 156
Dispensaries (Mission/NGO) 4
Private clinics 10
Beds capacity:
Public Health Facilities
Provincial Hospitals 0
County Hospital 160
Sub-county Hospitals 105
Total (Public facilities)
180
Mission/NGO Health facilities:
Hospitals 1
Health Centres 2
Dispensaries 2
Clinics 0
Total Mission facilities 5
Private health facilities:
Hospitals 1
Health Centres 2
Nursing homes Nil
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 268
Information Category Statistics
Dispensaries 2
Clinics
15
Total (Private Health) facilities
Community distribution by Distance to the nearest
Health facility (per cent)
0 – 1 KM 5
1.1 – 4.9KM 15
5KM and more 80
Average distance to health facility 15km
Doctor/population ratio 1:57,381
Nurse/ population ratio 1:4906
HIV prevalence 4.3
Children vaccination (per cent) 85
Contraceptive acceptance (per cent of women over
18)
7.5
Antenatal care (ANC) 45
Place of Delivery (per cent of children under 5
delivered) in:
Hospital 47.3
Health Centre 19.7
Dispensary/clinic 1.2
Maternity home per cent children
under 5 delivered at M/home
2.9
per cent children under 5 delivered
at home at home
58
Health facility deliveries (per cent) 34
Delivery Assistant (per cent):(children under 5)
Doctor 14.0
Midwife/nurse 25.2
TBA 53.2
Trained TBA 6.0
Self 4.1
Other 16.0
Morbidity Rates (per cent):(population by incidence
of sickness)
Male 35.7
Female 40.3
Total (County 38.0
Malaria Control:
Children under 5 who sleep under
bed net (per cent) (children U-5 who
sleep under treated bed net)
Untreated net 26
Treated net 28
Five most prevalent diseases per cent) (cases
reported)
Malaria/fever 14.1
Diarrhoea 1.9
Stomach-ache 4.7
Respiratory Diseases
Upper 0.9
Lower 3.5
Flu, etc 50.5
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 269
Information Category Statistics
Education
Pre-school:
No. of ECD centres 678
No. of ECD teachers 1446
Teacher/pupil ratio 1:27
Total enrolment Male
Female
Total
County
24130
20891
45021
National
2247272
Gross enrolment Rate 108.96 62.6
Net enrolment Rate (per cent) 99 41.8
Drop-out rate .0.5
Average years of attendance
Completion Rate
6 years
97
Retention Rate 99
Transition Rate 96
Primary school:
Number of primary schools 656
Number of teachers 5367
Teacher/pupil ratio
1:25
County National
Total enrolment Male
Female
Total
71,508
71,509
143,017
9,433,493
Gross enrolment Rate 97 110.8
Net enrolment Rate 95 77.2
Drop-out rate 3
Average years of attendance
Completion Rate
5
97
Retention Rate per cent 97
Transition Rate per cent 60
Communities‘ distribution by distance to nearest
public primary school (per cent):
0 – 1KM 80
1.1 – 4.9KM 19
5KM and more 1
Secondary schools:
Number of secondary schools 125
Number of teachers 878
Teacher/pupil ratio
1:26
County National
Total enrolment Male
Female
Total
15,200
12,174
27,374
1,798,587
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 270
Information Category Statistics
Gross enrolment Rate (per cent) 41 51.4
Net enrolment Rate 68 24.0
Drop-out rate
Average years of attendance
Completion Rate
15
Retention Rate 68
Communities distribution by distance to nearest
public Secondary school (per cent):
0 – 1KM 8
1.1 – 4.9KM 82
5KM and more 10
Tertiary institutions:
Public Universities (No.) Nil
Private Universities (No.) Nil
University Campuses/colleges (No.) 1
National Poly techniques 0
Science & Technology Institutes (No.) 1
Other Public Colleges (No. by type) 3
Youth Poly techniques 12
Private Accredited colleges by type 3
Private Non accredited college by type 0
Literacy: (Population aged 15+)
Ability to read:
Can Read (per cent) 34.5
Cannot read (per cent) 66.5
Ability to write:
Can write (per cent)
Cannot write (per cent)
Ability to read and write:
Can read and write (per cent)
Cannot read & write (per cent)
Water and sanitation
Households with access to piped water 7108
HH with access to potable water 495
Number of permanent rivers 11
No. of shallow wells 5022
No. of protected springs 80
No. of un-protected springs 84
No. of water pans 102
No. of Dams 143
No. of Bore holes 1545
HH with roof catchment systems 94
Mean distance to nearest water point 5Km
Households distribution by time taken (minutes, one
way) to fetch drinking water(per cent)
0 0
1 – 4 mins 6
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 271
Information Category Statistics
5 – 14 mins 8
15 – 29 mins 10
30 – 59 20
60+ 46
Number of Water Resource User Associations
(WRUA) Established
3
Households with Latrines (per cent) 14.3
County National
Distribution of Households by Main Source of water
(%)
Piped into dwelling
Piped
Rain/harvested
Borehole
Protected well
Protected spring
Unprotected well
Unprotected spring
Stream
Jabias
Water Vendor
Pond
Dam
Lake
Others
Community distribution by type of main toilet
facility (per cent):
1.7
12.3
0.3
6.9
2.0
2.7
5.4
3.8
52.2
0.1
1.1
2.2
4.2
2.1
3.1
6.9
23.1
0.8
11.0
7.4
7.0
5.7
4.4
21.6
0.3
6.5
2.1
2.0
1.1
0.3
Flush toilet 0.061
VIP Latrine 3.8
PIT Latrine/ 46
Uncovered Pit Latrine/
Covered Pit Latrine
Bucket 0.0179
Other 49
None 1
Community distribution by type of waste/garbage
disposal (per cent):
Collected by local Authority 0.5
Collected by Private firm 0
Garbage pit 2
Burning 0
Public garbage heap 97
Farm Garden 0.5
Neighborhood Community group 0
Energy
Trading centers with electricity 104
Trading centers without electricity 56
Health facilities with electricity 20
Health facilities without electricity 140
Secondary Schools with electricity 37
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 272
Information Category Statistics
Secondary Schools without electricity 88
HH distribution by main cooking fuel (per cent): County National
Electricity 0.2 0.8
Gas (LPG) 0.5 5.0
Biogas 0.3 0.7
Solar 0.0 0.1
Paraffin 1.0 11.6
Firewood 86.4 64.6
Charcoal 11.4 16.9
Other 0.1 0.3
HH distribution by main lighting fuel, (per cent).
Electricity 9.6 22.7
Solar 1.7 1.6
Gas Lamp 0.7 1.0
Pressure Lamp 0.4 0.6
Lantern 39.3 30.5
Tin lamp 20.1 38.5
Fuel wood 27.8 4.5
Others 0.4 0.7
Households distribution by cooking appliance
type:(per cent)
Traditional stone fire 49.7
Improved traditional stone fire 21.4
Ordinary Jiko 11.5
Improved Jiko 8.6
Kerosene Stove 6.2
Gas Cooker 1.8
Electric cooker 0.4
Other 0.4
Institutions (schools, hospitals, prisons, etc.) using
improved wood-fuel cooking stoves
70
Institutions (schools, hospitals, prisons, etc.) using
LPG
NIL
Institutions (schools, hospitals, prisons, etc.) using
kerosene
Not determined
Institutions (schools, hospitals, prisons, etc.) using
solar energy
50
Institutions (schools, hospitals, prisons, etc.) that
have established woodlots
Not determined
Transport & Communication
Road length:(Km)
Bitumen surface 339.22
Gravel surface 2035
Earth surface 557.37
Railway line length 5
Railway Stations 0
Sea/Lake Ports 0
Airports/Airstrips 4
Number of Telephone connections(per cent)
0.375
Mobile network coverage 45
No. of Cyber cafes 15
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 273
Information Category Statistics
No. of private courier services 1
Number of Post offices 9
Number of Sub-post offices 0
Licensed stamp vendors 0
Community distribution by distance to nearest Post
Office(per cent):
0 – 1KM 4
1.1 – 4.9KM 17
5KM and more 79
Wholesale and Retail Trade and Industry
Trading centres (No.) 92
Registered Retail traders (No.) 120
Registered wholesale traders (No.) 2
Industry
Manufacturing industries
Total Production by industries
Total Consumption
Surplus/deficiency
0
0
0
0
Bakeries 3
Juan Kali Associations 5
Juan Kali Artisans 1842
Tourism
Hotels by category:
Five Star 0
Four Star 1
Three Star 1
Two Star 0
One Star 0
Unclassified hotels 4
Bars and Restaurants 40
Hotel Bed capacity by category:
Five Star 0
Four Star 80
Three Star 70
Two Star 0
One Star 0
Unclassified hotels 342
Financial Services
Commercial Banks 5
Micro-finance Institutions 4
Building Societies 0
Village banks 0
Insurance Companies/branches 4
Housing County National
Distribution of Households by Ownership of
dwelling unit (%)
Owner occupied
Rented
83.7
16.3
68.0
32.0
HH distribution by main wall materials( per cent):
Stone 5.1 16.6
Brick/Block 3.7 16.8
Mud/Wood 50.0 36.7
Mud/Cement 6.3 7.7
CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 274
Information Category Statistics
Wood only 25.8 11.1
Corrugated Iron sheet 6.4 6.6
Grass Straw 1.5 3.2
Tin 0.1 0.2
Other 0.6 0.9
HH distribution by main floor materials (per cent):
Cement 24.8 41.0
Tiles 0.3 1.6
Wood 1.7 0.8
Earth 73.0 56.5
Other 0.2 0.2
HH distribution by main Roofing materials (per
cent):
Corrugated Iron Sheet 58.0 73.2
Tiles 1.0 2.2
Concrete 0.1 3.6
Asbestos Sheet 1.5 2.3
Tin 0.1 0.3
Grass 38.8 13.7
Makuti 0.2 3.2
Mud/dung 0.1 0.8
Other 0.2 0.7
Government houses by category 247
233
44
87
LG
MG
HG
Not Registered/unclassified
Community Development and social welfare
sector
Number of active women groups
Number of community based projects
Number of youth groups
Adult literacy classes
Number of orphans and vulnerable children
2829
203
2183
158
3439