COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page i REPUBLIC OF KENYA BARINGO COUNTY Office of the Governor, County Government of Baringo P.O. Box 53-30400 KABARNET Tel: 053-21077 Email:[email protected]/[email protected] Website: www.baringo.go.ke FIRST COUNTY INTEGRATED DEVELOPMENT PLAN 2013 2017 AUGUST 2013 KENYA TOWARDS A GLOBALLY COMPETITIVE AND PROSPEROUS NATION

Transcript of Baringo .pdf - Kenya Property Developers Association

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page i

REPUBLIC OF KENYA

BARINGO COUNTY

Office of the Governor,

County Government of Baringo

P.O. Box 53-30400

KABARNET

Tel: 053-21077

Email:[email protected]/[email protected]

Website: www.baringo.go.ke

FIRST COUNTY INTEGRATED DEVELOPMENT PLAN

2013 – 2017

AUGUST 2013

KENYA

TOWARDS A GLOBALLY COMPETITIVE AND PROSPEROUS NATION

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page ii

County Vision and Mission

1.1 Preamble

This county integrated development plan captures the aspirations, values and important

qualities of diverse communities in Baringo County. It also provides a roadmap of working

towards those important ends over the next five years. It is the result of the collaborative

effort of the people and leadership of the county led by the governor and his executive team,

the county assembly and other strategic stakeholders that respect the law and existing

development plans such as the MDGs and Vision 2030.

1.2 Shared vision

To be the most attractive, competitive and resilient county that affords the highest standard

of living and security for all its residents.

1.3 Mission

To transform the livelihoods of Baringo residents by creating a conducive framework that

offers quality services to all citizens in a fair, equitable and transparent manner by

embracing community managed development initiatives for environmental sustainability,

adaptable technologies, innovation and entrepreneurship in all spheres of life.

1.4 Core values

1. Honesty, integrity and prudent use of public resources

2. Environmental sustainability

3. Good governance, Transparency and Accountability

4. Harmonious and peaceful coexistence

5. Equitable, inclusive and People-driven leadership

6. Commitment toeam work and appreciation for diversity

7. Commitment to Results:

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page iii

FOREWORD

The constitution of Kenya 2010 establishes one of the most revolutionary

changes in the country‘s history with the establishment of the two tier

governance system with a national government and 47 county governments.

The constitution envisages that county governments shall spearhead

development at the county level with a view to bridge the developmental

disparities that have existed in the country since independence. Needless to

point out therefore, County governments have been tasked with specific

functions under the constitution, key among them agriculture, health, trade,

roads, county planning so as to spur growth and create employment.

Pursuant to the specific mandate in the Constitution 2010, the County

Government is required to prepare County Integrated Development Plan

(CIDP) that outlines the development goals covering a period of five years. The CIDP is the first for Baringo

County as it is in the other Counties and will cover the period 2013-2017. It replaces the District

Development Plans, which were used to guide development with the focus at the District under the former

constitutional dispensation. The Baringo CIDP has been prepared through an inclusive and a wide

consultative process required by Article 10 of the Constitutiuon.

Under the constitution of Kenya 2010, National and County Governments are distinct but interdependent.

The County Government is composed of the Governor, County Executive Committee and County Assembly.

The County Executive Committee is expected to supervise the administration and delivery of services to the

County citizenery as well as conceptualize and implement policies and county legislation. The County

Assembly is a legislative organ and will play an oversight role on all County public institutions including the

urban areas.

The County Government responsibilities and functions are specifically spelt out under the Fourth Schedule

of the Constitution. Currently, not all functions in the fourth schedule have been transfered to the county

governments. The County Government of Baringo will ensure that it has the capacity to undertake all the

functions as stipulated in the fourth schedule by the end of the transition period. This will include: prudence

financial management practices; build strong institutions of management of county affairs; and training and

capacity building of county government staff and the County Assembly. These will be done under the legal

framework established to support county governments where several laws on devolution have been enacted

including; The Urban Areas and Cities Act 2011; The County Governments Act 2012; The Traansition to

Devolved Government Act, 2012; The Intergovernmental Relations Act 2012 and The Public Finance

Management Act, 2012. Other relevant laws that have been enacted in the different sectors to support

implementation and operationalization of devolution include; the National Government Coordinating Act,

2012, and the County Governments Public Finance Management Transition Act, 2012.

Programmes that focus on the youthful population, who account for the highest proportion of the population,

especially addressing youth unemployment, will be implemented during the Plan period. Attention will be

given to provide knowledge and skills with a bias on entrepreneurship with affordable credit to enable them

engage in production of goods and services. Besides, the County Government is expected and will expand

middle level colleges in the county to take advantage of opportunities in the industrial sector as the county

moves towards industrialization. In addition, programmes and projects that support the agricultural sector,

H.E.Hon. Cheboi Benjamin, EBS

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page iv

which is the main economic activity in the county, will be aimed at transforming farming to make it more

competitive and increase production per unit.Raising the profitability of farmers will not only boost the

livelihoods of the county residents, but also attract the youth to join the sector, helping to also address

unemployment among the youth. The County Government will also start programmes aimed at diversifying

economic activities in the county. This includes value addition to agricultural produce and establishing

tourism sector and a circuit in the North Rift Region.

The County Government will work to attract investors in the county. Specific initiatives to establish and

create an enabling environment to attract direct investments in the county will be implemented. Key projects

especially the infrastructural projects will be marketed to investors to be implemented under the Public

Private Partnerships. This will also address the financing gaps for projects in the county.

Finally, I call upon the residents of the County of Baringo to commit towards the development process

outlined in this Plan. This is the beginning of a new phase that will see the transformation of the county,

improve the quality of life of the residents and as such all the stakeholders in the county must work together

to ensure that the Plan‘s objectives are realized.

H.E.Hon. Cheboi Benjamin, EBS

Governor, Baringo County

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page v

AKNOWLEDGEMENTS

The first County Integrated development Plan for County of Baringo was

prepared with the support and generous contribution of many individuals and

organizations. Our County Executive Committee would wish to appreciate the

role played by these individuals and institutions. Special thanks go to the

following; Acting Executive Committee Member for Finance Hon. Wesley

Keitany,and all the respective County Executive Committee Members; Hon.

Emily Cherogony,Hon Edwin Riamangura, Hon Caroline Lentupuru Hon.

Sadalla Lillian, Hon. Dr. Andrew Kwonyike, Hon. Geoffrey Bartenge, Hon. Job Tomno, Hon. Moses

Atuko,Consultants Julius Barno, Benjamin Sogomo and Felix Kiptum, and Kiprono Kosgei,County Development

Planning Officer. Other members of staff at the planning department who played a key role incude Mr. Simiyu Peter

Nalanda, Daniel K. Koech, Waweru James,. Brian Cheruiyot, Michael Ngetich, Solomon Kimuna among others.

We are also indebted to our partners USAID for their immense contribution financially and materially, as without them

the process could have stalled.

We are also thankful to the Honorable members of the Baringo County Assembly led by the Hon. Speaker Mr. Kamket

William who actively participated in the Public consultative forums and adoption of the Plan. The role of the various

stakeholders including government departments, civil society organizations, community members and the private sector

would not go unnoticed. Our appreciation also goes to the community members who participated in this process thereby

ensuring that we are in conformity with article 10 of the constitution. We particularly thank the County Directors of

various departments for the valuable role they played in sensitizing the community aspirations and linking them to

priority programmes and projects.

The Ministry of Devolution and Planning played a key role by preparing the guidelines and County Development

Profiles that has been borrowed heavily in doing this work and thus instrumental in preparation of this Plan.

To those who were involved, we salute you as we acknowledge that the greater challenge lies in the actual

implementation of this Plan.

We call on you to continue with the same support as we deliver the the programmes and projects documented herein,

and as we contribute towards attaining the priorities of the county including the Millenium Development Goals and

Vision 2030 which is the country‘s long term development blueprint that aims to create a globally competitive and

prosperous country providing a high quality of life for all its citizens. It aspires to transform Kenya into a newly

industrializing middle income country by 2030.

H.E. Hon. Eng.Tuitoek Matthew

Deputy Governor, Baringo County

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page vi

PREFACE

The Baringo County Integrated Development Plan was prepared by a county secretariat

that was led by the Committee Executive Member in charge of Finance and Planning

and the County Development Planning Officer in close collaboration with various

stakeholders including government departments, civil society organizations,

community groups and the private sector. In line with Article 10 of the Constitution of

Kenya 2010, the secretariat undertook consultations in all the 30 wards and

subcounties in the month of July and August 2013 to identify key development

priorities to be implemented over the next five years. These priorities were used to

inform the projects and programmes in this Plan. The increased participation by a wide

cross section of the people in the county in the preparation of the Plan is expected to

enhance the achievement of the key goal of devolution which is to empower citizens to

exercise their rights to be involved in their social and economic development.

The Kenya Vision 2030 is the country‘s development blueprint covering the period 2008 to 2030. It aims to transform

Kenya into a newly industrializing, ―middle –income country providing a high quality life to all its citizens by the year

2030‖.The vision is based on three pillars;Economic ,Social and Political Pillar.The pillars are supported by key

enablers and macro foundations of the Vision.For each of the Pillars and the key enablers and macro

foundations,priority sectors have been identified to drive the aspirations of the Vision.The Vision has also identified a

number of flagship projects to be implemented accros the country includind Baringo county for all sectors.

As provided by the constitution, the Plan is aligned with the Kenya Vision 2030 and the Second Medium Term

Plan.There are a number of the Vision flagship projects that are being implementedin the County. These projects have

been documented in this Plan, and the County Government will work together with the National Government to ensure

the successful implementation of these projects. In line with the development priorities outlined in the Second Medium

Plan aims at transforming the agricultural sector in the county, which is the backbone of the county‘s economy. Target

areas in this sector include increasing the area under irrigation, diversification of crop enterprises, support the

development of the livestock sector and improve the marketing of the agricultural produce to reduce exploitation by

middlemen. The county government will also seek to develop the industrial sector beginning with light manufacturing

for value addition and processing of agricultural produce. In addition, priority projects to support the sector such as in

the infrastructure, tourism, health and education sectors will be prioritized for implementation.

The county government will prioritize capacity building of the county executive, the staff and county assembly through

training programmes in addition to those organized by the national government. The county public service board will

recruit qualified and skilled human resources to ensure that the County Government of Baringo delivers on the mandate.

The County government will also work closely with the national government, development partners, private sector, civil

society organizations including faith based organizations, and other stakeholders in improving the livelihoods of the

people of Baringo County.

Hon.Kipchumba Wesley Keittany,

Ag.County Executive Committee Member,

Finance and Economic Planning.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page vii

Table of Contents

REPUBLIC OF KENYA ............................................................................................................................... I

BARINGO COUNTY .................................................................................................................................... I

COUNTY VISION AND MISSION .............................................................................................................. II

1.1 PREAMBLE ........................................................................................................................................... II

1.2 SHARED VISION .................................................................................................................................... II

1.3 MISSION ............................................................................................................................................... II

1.4 CORE VALUES ...................................................................................................................................... II

FOREWORD ............................................................................................................................................... III

AKNOWLEDGEMENTS ............................................................................................................................. V

PREFACE .................................................................................................................................................... VI

TABLE OF CONTENTS ............................................................................................................................ VII

LIST OF TABLES ...................................................................................................................................... XV

LIST OF MAPS AND FIGURES ............................................................................................................. XVII

ABBREVIATIONS AND ACRONYMS .................................................................................................. XVIII

EXECUTIVE SUMMARY ........................................................................................................................ XXI

CHAPTER ONE .......................................................................................................................................... 24

THE PROFILE ............................................................................................................................................ 24

1.1. LOCATION AND SIZE .......................................................................................................................... 25

1.2. PHYSICAL FEATURES ......................................................................................................................... 26

1.2.1. TOPOGRAPHY ................................................................................................................................. 26

1.2.2. WATER BODIES .............................................................................................................................. 26

1.2.3. ECOLOGICAL CONDITIONS ............................................................................................................. 26

1.2.4. CLIMATIC CONDITIONS .................................................................................................................. 27

1.3. ADMINISTRATIVE AND POLITICAL UNITS ........................................................................................... 27

1.3.1. ADMINISTRATIVE UNITS (SUB-COUNTIES, WARDS, LOCATIONS) ................................................... 27

1.3.2. POLITICAL UNITS ........................................................................................................................... 30

1.4. DEMOGRAPHIC ATTRIBUTES .............................................................................................................. 30

1.4.1. POPULATION SIZE AND COMPOSITION ........................................................................................... 30

1.4.2. POPULATION DENSITY AND DISTRIBUTION .................................................................................... 31

1.5. HUMAN DEVELOPMENT INDICATORS ................................................................................................. 36

1.5.1. YOUTH DEVELOPMENT INDEX (YDI) ............................................................................................ 37

1.5.2. GENDER DEVELOPMENT INDEX (GDI) AND GENDER EMPOWERMENT MEASURE (GEM)............ 37

1.5.3. SUMMARY OF SOCIO-ECONOMIC INDICATORS OF BARINGO COUNTY ........................................... 38

1.5.4. POVERTY LEVELS ........................................................................................................................... 40

1.6. INFRASTRUCTURE AND ACCESS ......................................................................................................... 41

1.6.1. ROAD, RAIL NETWORK, AIRPORTS AND AIRSTRIPS ........................................................................ 41

1.6.2. POSTS AND TELECOMMUNICATIONS: POSTS OFFICES, MOBILE TELEPHONY AND LANDLINE ........ 43

1.6.3. FINANCIAL SECTOR: BANKS, SACCOS AND MICRO-FINANCE INSTITUTIONS ............................. 43

1.6.4. EDUCATION INSTITUTIONS ............................................................................................................ 43

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page viii

1.6.5. ENERGY ACCESS ............................................................................................................................ 44

1.6.6. MARKETS AND URBAN CENTRES ................................................................................................... 44

1.6.7. HOUSING TYPES ............................................................................................................................. 44

1.7. LAND AND LAND USE ......................................................................................................................... 45

1.8. MEAN LAND HOLDING SIZE ................................................................................................................ 47

1.8.1. PERCENTAGE OF LAND WITH TITLE DEEDS .................................................................................... 47

1.8.2. LANDLESSNESS IN BARINGO .......................................................................................................... 47

1.9. COMMUNITY ORGANISATIONS/NON-STATE ACTORS ......................................................................... 47

1.9.1. COOPERATIVE SOCIETIES ............................................................................................................... 47

1.9.2. NON-GOVERNMENTAL AND INTERNATIONAL ORGANISATIONS ..................................................... 49

1.9.3. SELF HELP, WOMEN AND YOUTH GROUPS ...................................................................................... 49

1.9.4. ORPHANS AND VULNERABLE CHILDREN-CASH TRANSFER. ........................................................... 49

1.9.5. KABARNET VOCATIONAL REHABILITATION CENTRE (KVRC) ..................................................... 49

1.9.6. MARIGAT COMMUNITY CAPACITY SUPPORT PROGRAMME (CCSP MARIGAT) ............................ 50

1.9.7. GOK GRANTS TO COMMUNITY INITIATIVES .................................................................................. 50

1.9.8. OLDER PERSONS CASH TRANSFER (OPCT) ................................................................................... 50

1.9.9. PEOPLE WITH SEVERE DISABILITY (PWSD) CASH TRANSFER ...................................................... 50

1.9.10. NATIONAL FUND FOR THE DISABLED OF KENYA/ NATIONAL COUNCIL FOR PEOPLE WITH

DISABILITY (NFDK/NCPWD) ...................................................................................................................... 50

1.9.11. WOMEN ENTERPRISE FUND (WEF) ............................................................................................... 51

1.10. CROP, LIVESTOCK AND FISH PRODUCTION ..................................................................................... 51

1.10.1. MAIN CROPS PRODUCED ................................................................................................................ 51

1.10.2. ACREAGE UNDER FOOD CROPS AND CASH CROPS .......................................................................... 52

1.10.3. AVERAGE FARM SIZES ................................................................................................................... 54

1.10.4. MAIN STORAGE FACILITIES ............................................................................................................ 54

1.11. LIVESTOCK POPULATION ............................................................................................................... 55

1.11.1. CONTRIBUTION OF LIVESTOCK TO THE ECONOMY ......................................................................... 56

1.11.2. NUMBER OF RANCHES .................................................................................................................... 57

1.11.3. MAIN FISHING ACTIVITIES ............................................................................................................. 58

1.11.4. FORESTRY AND AGRO-FORESTRY .................................................................................................. 58

1.11.5. MAIN FOREST TYPES AND SIZES OF FORESTS ................................................................................. 58

1.11.6. FOREST PRODUCTS FROM GAZETTED AND UNGAZETTED FORESTS ................................................ 58

1.11.7. PROMOTION OF AGRO-FORESTRY AND GREEN ECONOMY ............................................................. 59

1.12. ENVIRONMENT AND CLIMATE CHANGE ......................................................................................... 60

1.12.1. MAJOR CONTRIBUTORS TO ENVIRONMENTAL DEGRADATION ....................................................... 60

1.12.2. EFFECTS OF ENVIRONMENTAL DEGRADATION .............................................................................. 61

1.12.3. CLIMATE CHANGE AND ITS EFFECTS .............................................................................................. 61

1.12.4. CLIMATE CHANGE MITIGATION MEASURES AND ADAPTATION STRATEGIES ................................. 61

1.13. MINING .......................................................................................................................................... 62

1.13.1. ONGOING ACTIVITIES ..................................................................................................................... 62

1.13.2. MINING POTENTIAL........................................................................................................................ 62

1.14. TOURISM ........................................................................................................................................ 62

1.14.1. MAIN TOURIST ATTRACTION, NATIONAL PARKS AND RESERVES .................................................. 62

1.14.2. MAIN WILDLIFE ............................................................................................................................. 63

1.15. EMPLOYMENT AND OTHER SOURCES OF INCOME .......................................................................... 64

1.15.1. WAGE EARNERS ............................................................................................................................. 64

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page ix

1.15.2. SELF EMPLOYED ............................................................................................................................ 64

1.15.3. LABOUR FORCE .............................................................................................................................. 64

1.15.4. UNEMPLOYMENT LEVELS .............................................................................................................. 65

1.16. WATER AND SANITATION .............................................................................................................. 65

1.16.1. WATER RESOURCES AND QUALITY ................................................................................................ 65

1.16.2. WATER SUPPLY SCHEMES .............................................................................................................. 66

1.16.3. WATER SOURCES (DISTANCE TO THE NEAREST WATER POINTS) ................................................... 66

1.16.4. SANITATION ................................................................................................................................... 66

1.17. EDUCATION AND LITERACY ........................................................................................................... 67

1.17.1. PRE-SCHOOL EDUCATION .............................................................................................................. 67

1.17.2. SPECIAL NEEDS EDUCATION [SNE] .............................................................................................. 67

1.17.3. PRIMARY EDUCATION .................................................................................................................... 68

1.17.4. LITERACY ...................................................................................................................................... 69

1.17.5. SECONDARY EDUCATION ............................................................................................................... 69

1.17.6. TERTIARY EDUCATION ................................................................................................................... 69

1.18. HEALTH ACCESS AND NUTRITION ................................................................................................. 70

1.18.1. HEALTH FACILITIES, PERSONNEL ................................................................................................... 70

1.18.2. MORBIDITY .................................................................................................................................... 70

1.18.3. NUTRITIONAL STATUS ................................................................................................................... 70

1.18.4. IMMUNISATION COVERAGE ............................................................................................................ 71

1.18.5. ACCESS TO FAMILY PLANNING SERVICES/CONTRACEPTIVE PREVALENCE .................................... 71

CHAPTER TWO ......................................................................................................................................... 72

COUNTY DEVELOPMENT ANALYSIS ................................................................................................... 72

2.1. NATIONAL CONTEXT .......................................................................................................................... 72

2.2. THE SECOND MEDIUM-TERM PLAN (MTP2): .................................................................................... 72

2.3. MILLENNIUM DEVELOPMENT GOALS (MDGS) ................................................................................. 73

2.4. CONSTITUTION OF KENYA, 2010 ....................................................................................................... 74

2.5. VISION 2030 FLAGSHIP PROJECTS AFFECTING BARINGO COUNTY .................................................... 74

2.6. REGIONAL CONTEXT .......................................................................................................................... 75

2.7. COMPARATIVE ADVANTAGES OF BARINGO COUNTY ........................................................................ 75

2.8. MAJOR DEVELOPMENT CHALLENGES ................................................................................................ 76

2.8.1. POOR INFRASTRUCTURE ................................................................................................................ 76

2.8.2. LIMITED WATER RESOURCES ......................................................................................................... 76

2.8.3. ENVIRONMENTAL DEGRADATION .................................................................................................. 77

2.8.4. POOR MARKETING SYSTEM AND LIMITED ACCESS TO FINANCIAL CREDIT SERVICES .................... 77

2.8.5. WEAK INSTITUTIONAL SYSTEMS ................................................................................................... 78

2.8.6. INFORMATION AND COMMUNICATION TECHNOLOGY .................................................................... 78

2.8.7. UNEMPLOYMENT ........................................................................................................................... 78

2.8.8. INSECURITY ................................................................................................................................... 78

2.8.9. RETROGRESSIVE CULTURAL PRACTICES ........................................................................................ 79

2.8.10. LAND TENURE SYSTEM .................................................................................................................. 79

2.9. CROSS CUTTING ISSUES ..................................................................................................................... 79

2.9.1. POVERTY ........................................................................................................................................ 79

2.9.2. GENDER INEQUALITY .................................................................................................................... 80

2.9.3. HIGH POPULATION GROWTH RATE ................................................................................................. 82

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page x

2.9.4. DISASTER MANAGEMENT ............................................................................................................... 83

2.9.5. ENVIRONMENTAL AND CLIMATE CHANGE ..................................................................................... 84

2.9.6. COUNTY DIVERSITY – MINORITY GROUPS AND REGIONAL BALANCE ........................................... 85

2.9.7. YOUTH ........................................................................................................................................... 86

2.9.8. PERSONS WITH DISABILITIES (PWDS ............................................................................................ 87

2.9.9. HIV AND AIDS .............................................................................................................................. 88

2.9.10. INFORMATION COMMUNICATION TECHNOLOGY ............................................................................ 89

2.10. ANALYSIS OF ISSUES AND CAUSES – POTENTIAL STRATEGIC POLICY THRUSTS ............................ 90

2.10.1. AGRICULTURE AND RURAL DEVELOPMENT SECTOR...................................................................... 90

2.10.2. HEALTH SECTOR ............................................................................................................................ 91

2.10.3. ENVIRONMENTAL PROTECTION, WATER AND HOUSING SECTOR ................................................. 92

2.10.4. PUBLIC ADMINISTRATION AND INTERNATIONAL RELATIONS SECTOR (PAIR) ............................ 93

2.10.5. SOCIAL PROTECTION, CULTURE AND RECREATION ...................................................................... 93

2.10.6. EDUCATION .................................................................................................................................... 94

2.10.7. ENERGY, INFRASTRUCTURE AND INFORMATION COMMUNICATION AND TECHNOLOGY .............. 95

2.10.8. GENERAL ECONOMIC, COMMERCIAL AND LABOUR ....................................................................... 95

CHAPTER THREE ..................................................................................................................................... 96

DEVELOPMENT STRATEGY .................................................................................................................. 96

3.1. WHAT DOES IT MEAN TO BE DEVELOPED? ......................................................................................... 96

3.2. THE WEALTH CREATION PATTERN ..................................................................................................... 97

3.3. IMPORTANCE OF ADOPTING A STRATEGIC APPROACH ....................................................................... 98

3.4. OVERALL OBJECTIVES .....................................................................................................................100

3.5. SOCIAL DEVELOPMENT GOALS ........................................................................................................101

3.6. ECONOMIC DEVELOPMENT GOALS ...................................................................................................101

3.7. ENVIRONMENTAL GOALS .................................................................................................................102

3.8. TRANSPORT AND INFRASTRUCTURE GOALS ....................................................................................102

3.9. DEVELOPMENT TARGETS .................................................................................................................103

CHAPTER FOUR ..................................................................................................................................... 107

COUNTY SPATIAL PLANNING FRAMEWORK .................................................................................. 107

4.1. INTRODUCTION ................................................................................................................................107

4.1.1. ROLE OF SPATIAL PLANNING .......................................................................................................108

4.1.2. OBJECTIVES OF SPATIAL PLANNING .............................................................................................108

4.1.3. APPROACH REQUIRED ..................................................................................................................108

4.1.4. RATIONALE FOR SPATIAL PLANNING ...........................................................................................108

4.2. THE BARINGO SPATIAL PLANNING FRAMEWORK ............................................................................108

4.3. URBANISATION IN BARINGO COUNTY .............................................................................................109

4.4. THE SERVICE CENTRE POLICY ..........................................................................................................109

4.4.1. DESIGNATED LOCAL CENTRES .....................................................................................................110

4.4.2. DESIGNATED MARKET CENTRES ..................................................................................................110

4.4.3. DESIGNATED RURAL CENTRE.......................................................................................................110

4.4.4. DESIGNATED URBAN CENTRES ....................................................................................................111

4.5. CONNECTIVITY BETWEEN THE SERVICE CENTRES ...........................................................................112

4.6. PHYSICAL DEVELOPMENT PLANS .....................................................................................................112

4.7. MODEL PHYSICAL DEVELOPMENT PLAN – A CASE OF MARIGAT TOWN ..........................................115

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xi

4.7.1. RESIDENTIAL LAND USE (ZONE 0) ...............................................................................................115

4.7.2. INDUSTRIAL- ZONE 1 ...................................................................................................................116

4.7.3. EDUCATION- ZONE 2 ...................................................................................................................116

4.7.4. RECREATION-ZONE 3 ...................................................................................................................116

4.7.5. PUBLIC PURPOSE -ZONE 4 ............................................................................................................116

4.7.6. COMMERCIAL ZONE - ZONE 5 ......................................................................................................116

4.7.7. PUBLIC UTILITY- ZONE 6 .............................................................................................................117

4.7.8. TRANSPORT –ZONE 7 ...................................................................................................................117

4.7.9. URBAN AGRICULTURE - ZONE 9 ..................................................................................................117

4.8. HOUSING IN BARINGO COUNTY .......................................................................................................117

CHAPTER FIVE ....................................................................................................................................... 119

ICT FRAMEWORK .................................................................................................................................. 119

5. ICT FRAMEWORK ................................................................................................................................119

5.1. INTRODUCTION ................................................................................................................................119

5.2. DELIVERING BETTER SERVICES .......................................................................................................120

5.3. OPEN GOVERNMENT ........................................................................................................................122

5.4. IMPROVE COUNTY GOVERNMENT OPERATIONS ...............................................................................123

5.5. ICT INFRASTRUCTURE .....................................................................................................................123

5.6. INFORMATION SECURITY RISK MANAGEMENT .................................................................................124

5.7. ESSENTIAL ICT SYSTEMS ................................................................................................................124

CHAPTER SIX .......................................................................................................................................... 125

DISASTER MANAGEMENT FRAMEWORK ........................................................................................ 125

CHAPTER SEVEN .................................................................................................................................... 128

COUNTYINTEGRATED DEVELOPMENT PLAN,LINKAGES WITH OTHER PLANS. .................... 128

7.1. INTRODUCTION ................................................................................................................................128

7.2. INTEGRATED DEVELOPMENT PLANNING ..........................................................................................128

7.3. LEGISLATION ON INTEGRATED PLANNING IN KENYA ......................................................................128

7.3.1. THE COUNTY GOVERNMENT ACT 2012 .......................................................................................128

7.3.2. TRANSITION TO DEVOLVED GOVERNMENT ACT, 2012 ...............................................................129

7.3.3. PUBLIC FINANCE MANAGEMENT ACT (PFMA), 2012 .................................................................129

7.3.4. URBAN AREAS AND CITIES ACT, 2011 ........................................................................................129

7.4. CIDP LINKAGES WITH KENYA VISION 2030 AND MEDIUM TERM PLAN ........................................130

7.5. CIDP LINKAGES WITH THE KENYA CONSTITUTION, 2010 ..............................................................131

7.6. IMPLEMENTATION OF MILLENNIUM DEVELOPMENT GOALS AT THE COUNTY ................................132

CHAPTER EIGHT .................................................................................................................................... 134

RESOURCE MOBILISATION FRAMEWORK ...................................................................................... 134

8.1. INTRODUCTION ................................................................................................................................134

8.2. TRENDS ............................................................................................................................................134

8.3. CONSTRAINTS TO RESOURCE MOBILISATION: ..................................................................................134

8.4. CAPITAL PROJECTS FUNDING ...........................................................................................................135

8.5. STRATEGIES FOR RAISING REVENUE ................................................................................................135

8.6. ESTABLISHMENT OF BARINGO INVESTMENT VEHICLE (BARINGO INVESTMENT CORPORATION) ...136

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xii

8.6.1. MANDATE ....................................................................................................................................136

8.7. ASSETS AND FINANCIAL MANAGEMENT ..........................................................................................137

8.8. RESOURCES FROM THE NATIONAL GOVERNMENT ..........................................................................138

8.9. STRATEGIES FOR MOBILISING BARINGO COUNTY HUMAN CAPITAL ..............................................138

8.10. OTHER STRATEGIES FOR MOBILISING COUNTY RESOURCES .......................................................139

CHAPTER NINE ....................................................................................................................................... 140

INVESTMENT FRAMEWORK ............................................................................................................... 140

9.1. ALLOCATION OF RESOURCES AMONG SECTORS ...............................................................................140

9.2. PROJECT SELECTION FRAMEWORK ..................................................................................................140

9.3. PUBLIC INVESTMENTS ......................................................................................................................141

9.4. PRIVATE INVESTMENTS ...................................................................................................................142

9.5. PUBLIC-PRIVATE PARTNERSHIPS .....................................................................................................142

9.6. PUBLIC-PUBLIC PARTNERSHIPS .......................................................................................................142

9.7. ROLE OF PUBLIC PROCUREMENT IN THE ECONOMIC DEVELOPMENT ...............................................143

CHAPTER TEN ........................................................................................................................................ 145

INSTITUTIONALFRAMEWORK ........................................................................................................... 145

10.1. SECTORAL PLANS .........................................................................................................................145

10.2. ORGANISATIONAL FLOW .............................................................................................................146

10.3. DEVOLVED COUNTY LEVEL UNITS .............................................................................................146

10.4. STAKEHOLDERS IN THE COUNTY .................................................................................................147

DEVELOPMENT PROGRAMMES AND PROJECTS ............................................................................ 149

11.1. INTRODUCTION ............................................................................................................................149

11.2. COUNTY FLAGSHIP PROJECTS/PROGRAMMES .............................................................................149

GENERAL ECONOMIC .......................................................................................................................... 149

COMPREHENSIVE BASELINE SURVEY, RESOURCE MAPPING AND CIDP DELIVERY

ENVIRONMENT ...................................................................................................................................... 149

LAND AND URBAN DEVELOPMENT ................................................................................................... 149

ESTABLISHMENT OF SPATIAL INFRASTRUCTURE ........................................................................ 149

WATER AND IRRIGATION .................................................................................................................... 150

TRANSPORT ............................................................................................................................................ 150

AVIATION ................................................................................................................................................ 152

HEALTH ................................................................................................................................................... 152

UPGRADING OF A KABARNET SUB-COUNTY HOSPITAL TO LEVEL 5 ....................................... 152

TOURISM ................................................................................................................................................. 152

DEVELOPMENT OF KAMNAROK GAME RESERVE ......................................................................... 152

EDUCATION ............................................................................................................................................ 152

ESTABLISH 3 NEW TECHNICAL INSTITUTIONS IN 3 SUB COUNTIES ......................................... 152

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xiii

ESTABLISH ONE PUBLIC UNIVERSITY ............................................................................................. 152

ESTABLISHMENT OF LIBRARIES ....................................................................................................... 152

INDUSTRIAL ............................................................................................................................................ 152

ESTABLISHMENT OF AN INDUSTRIAL PARK / CORRIDOR ........................................................... 152

PPP INVESTMENTS IN AGRICULTURE, LIVESTOCK AND FISHERIES ........................................ 152

ESTABLISHMENT OF FISH VALUE CHAIN FACILITY .................................................................... 152

DAIRY PROCESSING PLANT ................................................................................................................ 153

POTATO COLD STORAGE PLANT ....................................................................................................... 153

LEATHER DEVELOPMENT CENTRE .................................................................................................. 153

LORUK AND BARWESSA INTERNATIONAL CLASS SLAUGHTERHOUSE ................................... 153

FRUIT AND NUT PROCESSING ............................................................................................................ 153

ENERGY ................................................................................................................................................... 153

ESTABLISHMENT OF THE BARINGO ENERGY CORPORATION ................................................... 153

YOUTH...................................................................................................................................................... 153

ESTABLISHMENT OF YOUTH EMPOWERMENT CENTRES ........................................................... 153

11.3. AGRICULTURE AND RURAL DEVELOPMENT ................................................................................154

ROLE OF STAKEHOLDERS .............................................................................................................................154

11.3.2. COOPERATIVE DEVELOPMENT ....................................................................................................160

11.3.3. PROPOSEDACTIVITIES (MTP CONSULTATIONS) UNDER AGRICULTURE SECTOR ........................163

11.3.4. NEW PROJECTS (CIDP SUB COUNTY CONSULTATIONS) .............................................................165

11.3.5. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................168

11.4. EDUCATION SECTOR ....................................................................................................................168

ONGOING PROJECTS: EDUCATION ................................................................................................... 170

11.4.1. NEW PROJECT PROPOSALS ...........................................................................................................170

11.4.2. PROPOSED PROGRAMMES ............................................................................................................172

11.4.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES ...............................................................174

11.5. ENERGY INFRASTRUCTURE AND ICT SECTOR .............................................................................174

VISION .........................................................................................................................................................174

MISSION .......................................................................................................................................................174

COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................174

ROLE OF STAKEHOLDERS ............................................................................................................................174

11.5.1. PROJECTS AND PROGRAMME PRIORITIES ....................................................................................175

11.5.2. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................179

11.6. ENVIRONMENTAL PROTECTION WATER AND HOUSING SECTOR ................................................180

VISION .........................................................................................................................................................180

MISSION .......................................................................................................................................................180

COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................180

ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................180

11.6.1. PROJECT AND PROGRAMME PRIORITIES ......................................................................................181

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xiv

FLAGSHIP PROJECTS ............................................................................................................................ 181

11.6.2. NEW PROPOSALS (MTP CONSULTATIONS) .................................................................................181

11.6.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .............................................................199

11.7. GENERAL ECONOMIC, COMMERCIAL AND LABOUR AFFAIRS (GECLA) ....................................199

ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................200

11.7.1. PROJECTS/PROGRAMMES .............................................................................................................201

TRADE AND INDUSTRY ......................................................................................................................... 201

11.7.2. PROPOSED PROJECTS (CIDP SUBCOUNTY CONSULTATIONS) .....................................................205

11.7.3. STRATEGIES TO MAINSTREAM CROSS CUTTING ISSUES ...............................................................211

11.8. HEALTH SECTOR ..........................................................................................................................212

VISION ...................................................................................................................................................... 212

MISSION ................................................................................................................................................... 212

COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................212

ROLE OF STAKEHOLDERS ............................................................................................................................212

11.8.1. PROJECT AND PROGRAMME PRIORITIES ......................................................................................213

11.8.2. ON-GOING PROJECTS AND PROGRAMMES: NATIONAL HOSPITAL INSURANCE FUND .................214

11.8.3. PROPOSED PROJECTS/ PROGRAMMES: HEALTH SERVICES ..........................................................217

11.8.4. CROSS-CUTTING ISSUES ...............................................................................................................220

11.9. SOCIAL PROTECTION CULTURE AND RECREATION .....................................................................220

VISION ...................................................................................................................................................... 220

MISSION ................................................................................................................................................... 220

11.9.1. COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................220

ROLE OF STAKEHOLDERS IN THE SECTOR ...................................................................................................221

11.9.2. PROJECTS AND PROGRAMMES .....................................................................................................222

ON- GOING PROJECT/PROGRAMMES ............................................................................................................222

11.9.3. NEW PROJECTS (MPT 2 CONSULTATIONS) ....................................................................... 225

11.9.4. MAINSTREAMING OF CROSS-CUTTING ISSUES ............................................................................230

11.10. GOVERNANCE, JUSTICE, LAW AND ORDER SECTOR (GJLOS) ....................................................231

VISION ...................................................................................................................................................... 231

MISSION ................................................................................................................................................... 231

COUNTY RESPONSE TO SECTOR VISION AND MISSION ...............................................................................231

ROLE OF THE STAKEHOLDERS .....................................................................................................................231

11.10.1. PROJECTS AND PROGRAMMES .................................................................................................233

ONGOING PROJECTS AND PROGRAMMES ...................................................................................... 233

NEW PROJECTS (MTP CONSULTATIONS) ......................................................................................... 234

THE MTP CONSULTATIONS IDENTIFIED SECURITY AS A PRIORITY AREA THAT NEEDED

URGENT ATTENTION. ........................................................................................................................... 234

11.10.2. PROPOSED PROJECTS ...............................................................................................................236

11.10.3. STRATEGIES TO MAINSTREAM CROSS-CUTTING ISSUES .........................................................237

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xv

11.11. FINANCE AND ECONOMIC PLANNING ............................................................................... 237

SECTOR VISION AND MISSION ........................................................................................................... 237

ROLE OF STAKEHOLDERS ................................................................................................................... 238

11.11.1. ISSUES, CAUSES AND PROPOSED INTERVENTIONS IN THE SUB SECTOR .............. 238

ONGOING PROJECTS ............................................................................................................................ 239

NEW PROJECTS ...................................................................................................................................... 240

CHAPTER TWELVE ................................................................................................................................ 242

MONITORING AND EVALUATION FRAMEWORK ........................................................................... 242

12.1.INTRODUCTION ....................................................................................................................................242

12.2. INSTITUTIONAL FRAMEWORK FOR MONITORING AND EVALUATION ................................................242

ANNEX I: THE COUNTY FACT SHEET ..........................................................................................................262

List of Tables Table 1: Administrative units in Baringo .............................................................................................. 27 Table 2: Registered Voters (Source: IEBC, 2012) ................................................................................. 30 Table 3: Population projections by age cohort and gender ...................................................................... 31 Table 4: Population distribution and density ......................................................................................... 32 Table 5:Population projections for selected age groups .......................................................................... 33 Table 6: Population projections by urban centre.................................................................................... 35 Table 7 Socioeconomic indicators in Baringo County ........................................................................... 38 Table 8: Road network in Baringo County ........................................................................................... 41 Table 9: Airstrips and airfields in Baringo County (Source: Chief Warden-KWS) .................................... 42 Table 10: Land use patterns in Baringo County .................................................................................... 46 Table 11: Livestock production in Baringo County: .............................................................................. 55 Table 12: Proceeds from the sale of live animals (2012) ........................................................................ 56 Table 13: Proceeds from the sale of livestock products (2012) ............................................................... 56 Table 14: Projected revenue estimates based on potential production ...................................................... 57 Table 15: Tourist class hotels/restaurants and bed Capacity ................................................................... 64 Table 16: Water sources for different Households in Baringo County ..................................................... 66 Table 17: SWOT Analysis of Baringo with respect to poverty ............................................................... 80 Table 18: SWOT Analysis of Baringo regarding gender inequality ............................................................... 81

Table 19: SWOT analysis of Baringo with respect to population growth ................................................. 82 Table 20: SWOT Analysis of Disaster Management.............................................................................. 83 Table 21: SWOT Analysis of Environment and Climate change ............................................................. 85 Table 22: SWOT Analysis of county diversity - Minority groups and regional balance ............................. 86 Table 23: SWOT Analysis of Youth .................................................................................................... 86 Table 24: SWOT Analysis .................................................................................................................. 87 Table 25: SWOT Analysis .................................................................................................................. 88 Table 26: SWOT analysis: .................................................................................................................. 89 Table 27: Policy thrusts for Agriculture and Rural Development ............................................................ 90 Table 28: Policy Thrusts for the Health Sector ...................................................................................... 91 Table 29: Policy thrusts for Environment, Water, Land and Housing ...................................................... 92 Table 30: Policy thrusts for Public Administrtaion and International Relations ........................................ 93 Table 31: Policy thrusts for Social Protection and Culture ..................................................................... 93 Table 32: Policy thrusts for Education ................................................................................................. 94 Table 33: Policy Thrusts for Energy, Infrastructure and ICT .................................................................. 95 Table 34: Policy thrusts for the General Economic, Commercial and Labour Affairs ................................ 95

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xvi

Table 35: Economic and Social rights under the Constitution of Kenya ................................................. 100 Table 36: Some development targets in Baringo County ...................................................................... 103 Table 37: Residential land use specifications for Marigat Town ........................................................... 115 Table 38: ICT Activities for building capability .................................................................................. 121 Table 39: ICT activities for enabling better services ............................................................................ 121 Table 40: ICT for fostering an Open Government ............................................................................... 122 Table 41: Using ICT for Strengtherning Collaboration ........................................................................ 122 Table 42: Using ICT for Improving Government Operations ............................................................... 123 Table 43: Using ICT to encourage Innovation .................................................................................... 123 Table 44: Consideration for resource allocation among sectors ............................................................ 140 Table 45: Weights to be assigned to different factors when selecting projects ........................................ 141 Table 46: Stakeholders and their roles in Baringo County .................................................................... 147 Table 47: Proposed Flagship Projects ................................................................................................ 149

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xvii

List of Maps and Figures Map 1: The position of Baringo County in Kenya (Source: ILRI Data) ................................................... 24 Map2: Baringo and surrounding counties – (Source: ILRI) .................................................................... 25 Map3: Elevation and rivers in Baringo (Source: ILRI Data) ................................................................... 26 Map 4: Baringo Subcounties ............................................................................................................... 28 Map 5: Administrative Wards in Baringo County ................................................................................. 29 Figure 6:Population trends in Baringo Count ........................................................................................ 32 Figure 7: Population distribution by age ............................................................................................... 33 Figure 8: Population Distribution by Age ............................................................................................. 34 Figure 9: Urban Population in Baringo ................................................................................................ 36 Figure 10: Comparison of Human Development Indicators in Baringo against national figures ................. 36 Figure 11: Human Development Indicators in Baringo .......................................................................... 37 Figure 12: Poverty rankings of Kenyan counties (Source: Gok, 2011) ..................................................... 40 Figure 13: Land Use in Baringo (Source: ILRI Data) ............................................................................ 46 Figure 14: State of co-operative societies in Baringo County as at 31/12/2013 ......................................... 48 Figure 15: Crop Production Estimates for Baringo County .................................................................... 53 Figure 16: Income distribution among cash crops ................................................................................. 54 Figure 17: A prosperous pattern for wealth creation in Baringo .............................................................. 97 Figure 18: Key Enablers for the Economy of Baringo ........................................................................... 97 Figure 19: Role of ICT in the public sector of Baringo ........................................................................ 120 Figure 20 : Development through use of public funds.......................................................................... 142 Figure 21 : Organisation of the County Government of Baringo ........................................................... 146 Figure 22: County Flagship, Geothermal and Security Roads ............................................................... 179

Field Code Changed

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xviii

Abbreviations and Acronyms

ACU AIDS Control Units

ADB African Development Bank

AFC Agricultural Finance Corporation

AGOA African Growth Opportunity Act

AI Artificial Insemination

AIDS Acquired Immune Deficiency Syndrome

ANS Age Not Specified

ARV Anti Retroviral Drugs

CACC Constituency Aids Control Committee

CAP Community Action Plan

CBHC Community Based Health Centre

CBO Community Based Organization

CDF Constituencies Development Fund

CDP County Development Profile

CEISP Community Empowerment and Institutioinal Support Projects.

CGB County Government of Baringo

CHW Community Health Worker

CIDP County Integrated Development Plan

CKDAP Central Kenya Dry Areas Project

COMEC County Monitoring & Evaluation Committee

DDO Sub County Development Officer

DRR Disaster Risk Reduction

ECD Early Childhood Development

EMCO Early Maturing Crop

FBO Faith Based Organization

FCC Forest Conservation Committees

FGM Female Genital Mutilation

FKE Federation of Kenya Employers

FTC Farmers Training Centre

GDC Geothermal Development Company

GoK Government of Kenya

HIV Human Immunodeficiency Virus

ICDC Industrial and Commercial Development Corporation

ICT Information Communication Technology

IEBC Independent Electoral and Boudaries Commission

IFAD International Fund for Agriculture Development

ILO International Labour Organisation

IT Information Technology

JICA Japan International Cooperation Agency

K REP Kenya Rural Enterprise Programme

KAM Kenya Association of Manufacturers

KAPAP Kenya Agricultural Productivity and Agribusiness Project

KARI Kenya Agricultural Research Institute

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xix

KCC Kenya Cooperative Creameries

KCPE Kenya Certificate of Primary Education

KCSE Kenya Certificate of Secondary Education

KEFRI Kenya Forest Research Institute

KENBRO Kenyan broilers

KEPI Kenya Expanded Programme for Immunization

KESSP Kenya Education Sector Support programme

KFA Kenya Farmers Association

KNBS Kenya National Bureau of Statistics

KP&LC Kenya Power and Lighting Company

KPHC Kenya Population and Housing Census

KTDC Kenya Tourism Development Corporation

KWFT Kenya Women Finance Trust

KWS Kenya Wildlife Service

LATF Local Authority Transfer Funds

MCH Maternal Child Health

MDG Millennium Development Goals

MOA Ministry of Agriculture

MoH Ministry of Health

MOPW Ministry of Public Works

MTEF Medium Term Expenditure Framework

MUAC Middle Upper Arm Circumference

MYWO Maendeleo Ya Wanawake Organisation (MYWO)

N/A Not Available

NALEP National Agriculture and Livestock Extension Programme

NCCK National Council of Churches of Kenya

NCPB Nation Cereal and Produce Board

NDMA National Drought Management Authority

NEMA National Environment Management Authority

NGO Non Governmental Organization

OVC Orphans and Vulnerable Children

PDRA Participatory Disaster Risk Analysis

PFP Partnership for Progress

PGH Provincial General Hospital

PHC Public Health Committee

PHO Public Health Office

PHT Public Health Technician

PIP Public Investment Programme

PLWHA People Living With HIV/AIDS

PMTCT Prevention of Mother to Child Transmission

PRSP Poverty Reduction Strategy Paper

PTA Parents Teachers Association

RMLF Roads Maintenance Levy Fund

SACCO Savings and Credit Cooperatives

SIDA Swedish International Development Agency

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xx

SIDC Sub County Information and Documentation Centre

SISDO Small Irrigation Support Development Organization

SSDO Sub County Social Development Officer

STD Subscriber Trunk Dialling

STDs Sexually Transmitted Diseases

STI Sexually Transmitted Infection

SWO Sub County Works Officer

SYO Sub County Youth Officer

TBA Traditional Birth Attendant

TOWA Total War Against AIDS

URTI Upper Respiratory Tract Infections

VCT Voluntary Counselling and Testing

VIP Ventilated Improved Pit (Latrine)

WRMA Water Resource Management Authority

WS Water Supply

WVK World Vision Kenya

YEDF Youth Enterprise Development Fund

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxi

Executive summary

A key objective of this County Integrated Development Plan is to identify community

developmental priorities to be implemented over the next five years.

This document will inform the preparation and implementation of sectoral plans as well as the

spatial plan for Baringo County. It is divided into twelve chapters as follows:

Chapter One: Provides the the general information, background description of the county in terms

of its area, administrative divisions, main physical features, settlement patterns, as well as a

summary of data essential for making informed choices while planning.

Chapter Two: Outlines major development challenges facing the county. In addition, it gives a

SWOT analysis on crosscutting issues being experienced in the county. An analysis of sub-sector‘s

issues as identified in the MTEF process is also discussed in the chapter, showing the policy thrusts,

causes and strategies needed to solve them.

Chapter Three: Maps out the development strategy and identifies the overall, social, economic,

environmental and infrastructural goals that need to incorporated in the development plan.The

chapter also presents some strategic considerations for the formulation of the development plan.

Chapter Four: Introduces the spatial framework for the development of the county. It establishes a

context for the development of a spatial plan, which will be developed as per the requirements of

theCounty Government Act. The development of the spatial plan should be given immediate

priority, as it is the basis of all economic industrial development in the county. This section also

identifies the major urban areas and how they are related to each other. It also briefly addresses the

issue of housing policy within the county.

Chapter Five: provides a framework for Baringo County Government to leverage ICT to increase

public sector productivity by enabling the delivery of services for the people, communities and

businesses. The adoption of ICT will also ensure open engagement and better-informed decisions as

well as improving operations.

Chapter Six: recognizes the challenges Baringo faces as far as disaster management is concerned

and provides a framework for its management. It establishes a context for PDRA and work plan

development.

Chapter Seven: Discusses the linkages between the County Integrated Development Plan, Kenya

Vision 2030 and the Constitution of Kenya. A brief status of MDGs at the county level is also

provided.

Chapter Eight: Contains a resource mobilization strategy for the county government. It indicates

the resources available for capital projects development. It outlines strategies for raising revenue

and their projections for the plan period. Strategies for asset management, financial management

and capital financing are also outlined. These include strategies to expand the revenue generation,

resource sharing with the centralgovernment and means of attracting external funding.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxii

Chapter Nine: Presents a framework for the management of investment in the county. It provides

a mechanism for selection of projects and allocation of resources to devolve public resources

beyond the county level.

Chapter Ten: Outlines the institutional framework and organisational flow to be followed in

implementing the plan. It also outlines the stakeholders in the county, their roles and how their

functions are accommodated to avoid duplication of efforts. This section also identifies the sectorial

plans that will need to be developed.

Chapter Eleven: Development programs and projects. This involves a programmatic identification

of development priorities, projects and programmes as well as the strategies to realise the said

programmes. The projects were identified by the public in ward and sub-county fora held

throughout the county.

There are also on-going priority projects and programmes in the respective MTEF sectors that had

been identified and proposed for implementation in the plan period 2008-2012. Flagship projects

relevant to the county have also been identified.The MTEF sectors are agriculture and rural

development; energy; infrastructure and ICT; general economic, commercial and labour affairs;

health; social protection, culture and recreation; justice; law and order water and housing; public

administration an internal relations; environmental protection, education and; governance.

Chapter Twelve: Elaborates on the implementation, monitoring and evaluation framework for all

the projects. It gives details in a matrix format of the implementation plans together with monitoring

and evaluation strategies. The overall M&E committees in the county will be the CMEC, which will

be mandated and facilitated to ensure its activities reflect a serious M&E agency. The CMEC will

be reporting to other development committee‘s inthe county. The proposed system is expected to

boost efficiency and ensure projects/programmes are implemented according to approved proposals

so as to realize targeted outputs and outcomes.

This county integrated development plan is informed by the national strategic direction as

articulated in the Vision 2030 that guides Kenya to become a newly industrialised middle-income

country that provides high quality life for all citizens by the year 2030. The vision is based on three

pillars namely: Economic pillar, whose key goal is to maintain a sustained economic growth of 10%

annually over the next 25 years. The second one is the social pillar, whose goal is to build a just and

cohesive society enjoying equitable social development in a clean and secure environment. The

third is political pillar, which aims at building an issue-based, people-centred, result-oriented and

accountable democratic political system.

The pillars are anchored in key foundations namely: Infrastructure, energy, science, technology and

innovation, land reforms, human resource development, security and public service.

The county fact sheet elsewhere in the CIDP presents a broad range of the county statistics at a

glance. It captures factual information such as county area, ecological and climatic conditions and

demographic features. The socio-economic indicators and basic data in specific sectors are also

provided, as they have a direct bearing on the county‘s development agenda and poverty reduction

strategies.

In conclusion, a well-managed devolution of functions from the national government as provided in

the constitution is predicted to spur unprecedented development in Baringo County. The realisation

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page xxiii

of the county‘s development agenda is pegged on adequate and timely disbursement of funds,

proper coordination in implementation of development activities and robust monitoring and

evaluation system for ongoing programmes and projects funded through internal and external

resources.

It is, therefore, recommended that a CMEC is formed and mandated to spearhead monitoring and

evaluation at the county level. The CMEC should be composed of members representing national

and county government agencies, civil society organisations and other stakeholders. This plan

proposes that the head of this committee be domiciled and answerable directly to the governor or

his appointee.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 24

Chapter One

The Profile This chapter gives background information on the socio-economic and infrastructural

information that have a bearing on the development of the county. The chapter provides

description of the county in terms of the location, size, physiographic and natural conditions,

demographic profiles as well as the administrative and political units. In addition, it provides

information on infrastructure and access; land and land use; community organisations/non-state

actors; crop, livestock and fish production; forestry, environment and climate change; mining;

tourism; employment and other sources of income; water and sanitation; health access and

nutrition; education and literacy; trade; energy; housing; transport and communication;

community development and social welfare. Detailed data is presented in the fact sheet given in

Annex I.

Map 1: The position of Baringo County in Kenya (Source: ILRI Data)

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 25

1.1. Location and size

Baringo is one of the 47 counties in Kenya. It is situated in the Rift Valley region. It borders

Turkana and Samburu counties to the north, Laikipia to the east, Nakuru and Kericho to the

south, Uasin Gishu to the southwest, and Elgeyo-Marakwet and West Pokot to the west. It is

located between longitudes 35 30‘ and 36 30‘ East and between latitudes 0 10‘ South and 1 40‘.

The Equator cuts across the county at the southern part. Baringo covers an area of 11,015.3 sq

km of which 165 sq km is covered by surface water- Lake Baringo, Lake Bogoria and Lake

Kamnarok.

Map2: Baringo and surrounding counties – (Source: ILRI)

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 26

1.2. Physical features

1.2.1. Topography

As shown in Map 3, Baringo varies in

altitude between 3000m above mean sea

level at its highest points and nearly 700m

above mean sea level at its low points.

Map3: Elevation and rivers in Baringo

(Source: ILRI Data)

One of the prominent features is the

Kerio Valley, which is situated on the

western part of the county. In the

eastern part of the county near Lake

Baringo and Bogoria is the Loboi

Plain covered mainly by the

latchstring salt-impregnated silts and

deposits. The Tugen Hills form a

conspicuous topographic feature in the

county. The trend of the hills is north-

south and mainly consists of volcanic

rocks. The hills have steep slopes with

prominent gullies. On the eastern and

western parts of the hills are

escarpments. Rivers on the hills flow

in very deep gorges.

1.2.2. Water bodies

The floor of the Rift Valley owes its origin to the tectonic and volcanic disturbances, which

have dislocated surfaces, forming separate ridges. The troughs of the rift that have a north-

south alignment are occupied by Lake Baringo and Bogoria, which occupy 164km2. Lake

Bogoria is particularly spectacular because it is one of the few hot water lakes in the world.

Lake Kamnarok covers 1km2.

1.2.3. Ecological conditions

Exotic forests exist in the county but the known indigenous forests are found in Kabarnet,

Kabartonjo, Tenges, Lembus, Saimo, Sacho and Ol‘ Arabel and Eldama Ravine. The main

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 27

exotic species are: Grevellea Rabusta, Cuppressus lusitanicand Eucalyptus saligna.

Prosopis juliflora also exists in Marigat area.Kipng‘ochoch forest in Sacho, one of the 10

forest blocks under Tenges forest station, is an example of a well conserved indigenous

forest where visitors and nature lovers could view the entire Lake Baringo basin, fluorspar

mines, Laikipia ranges, Elgeyo escarpment, Kerio Valley and other touristic attractions that

the county offers.The county is classified as arid and semi-arid. Most parts of East Pokot,

Baringo Central, Baringo South, Baringo North, Mogotio sub-counties are arid and semi-

arid except for Koibatek sub-county, which is in a highland zone.

1.2.4. Climatic conditions

The rainfall varies from 1,000mm to 1,500mm in the highlands to 600mm per annum in the

lowlands. Due to their varied altitudes, the sub-counties receive different levels of rainfall.

Koibatek sub-county receives the highest amount of rainfall. The lowland sub-counties of

Mogotio, East Pokot and Baringo North receive relatively low amounts. The temperatures

range from a minimum of 10°C to a maximum of 35°C in different parts of the county.

Average wind speed is 2m/s and the humidity is low.The climate of Baringo varies from

humid highlands to arid lowlands while some regions are between these extremes.

1.3. Administrative and political units

1.3.1. Administrative units (sub-counties, wards, locations)

The county is made up of six sub-counties namely: Mogotio, Koibatek, Marigat, Baringo

Central, Baringo North and East Pokot. The sub-counties are further divided into 30 wards

(divisions) and 116 locations. Table 1 shows the administrative units in Baringo County.

Table 1: Administrative units in Baringo

Sub County Area Km2 Number of

Wards/

Divisions

Number of

Locations

Number of

Electoral

Wards

Mogotio 1314.6 5 24 3

Koibatek 1002.5 4 16 6

Marigat 1678 3 17 4

Baringo Central 799.9 4 21 5

Baringo North 1703.5 4 14 5

East Pokot 4516.8 6 24 7

Total 11015.3 26 116 30

Source: KNBS, Baringo, 2013

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 28

Map 4: Baringo Subcounties

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 29

Map 5: Administrative Wards in Baringo County

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 30

1.3.2. Political units

The county has six constituencies, namely, Mogotio, Eldama Ravine, Baringo Central,

Tiaty, Baringo North and Baringo South. The County has 30 county assembly wards and

171,344 registered voters as indicated in the table 2 below.

Constituency No. of

county

assembly

wards

Names of the wards 2013

Eligible

voters

Registered

voters

Baringo North 5 Barwessa/Kabartonjo/Saimo

-Kipsaramaan/Saimo Soi/Bartabwa

44,930 33,044

Baringo Central 5 Kabarnet/Sacho/Tenges/Ewalel-

Chapchap and Kapropita

37,000 29,000

Eldama Ravine 6 Lembus/Lembus

Kwen/Ravine/Mumberes-

MajiMazuri/Lembus- Perkerra and

Koibatek

49,078 38,252

Mogotio 3 Mogotio/Emining and Kisanana 27,576 23,997

Tiaty 7 Tirioko/Kolowa/Ribkwo/Silale/Loi

yamorok/Tangulbei-Korossi and

Churo-Amaya

48,826 20,415

Baringo South 4 Marigat/Ilchamus/Mochongoi and

Mukutani

37,000 26,636

Total (County) 30 244,410 171,344

Table 2: Registered Voters (Source: IEBC, 2012)

As indicated in Table 2, the total number of registered voters in the county in 2012 was

171,344 against the eligible voter population of 244,410. The sub-county with the lowest

registered voters was East Pokot with 40 percent population of registered voters. The

constituency with the highest percentage of registered voters was in Eldama Ravine

constituency with 80 percent of the eligible voters being registered.The IEBC needs to

conduct more civic education and registration to increase the number of registered voters,

especially in Baringo East and Baringo North constituencies.

1.4. Demographic attributes

1.4.1. Population size and composition

According to the population and housing census conducted in 2009, the population size of

Baringo County was 555,561, consisting of 279,081 males and 276,480 females. The

county‘s inter-censal growth rate is 3.3 per cent per annum, which is above the national

average of 3 per cent. The population of the county is estimated to be 613,376 in 2012 and is

further projected to increase to 677,209 and 723,411 in 2015 and 2017 respectively. Table 3

shows the population projections by gender and age cohort for the county.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 31

Table 3: Population projections by age cohort and gender

Age

Cohort

2009

(Census) 2012

(Projections)

2015

(Projections)

2017

(Projections)

Male Female Total Male Female Total Male Female Total Male Female Total

0-4 46950 44569 91519 48525 49207 101043 57230 54328 111558 61135 58035 119169

5-9 47011 44752 91763 51903 49409 101312 57305 54551 111856 61214 58273 115724

10-14 44302 41504 85806 48912 45823 94736 54002 50592 104594 57687 54044 108212

15-19 34292 30641 64933 37861 33830 71690 41801 37350 79151 44653 39899 81888

20-24 23109 24818 47927 25514 27401 52915 28169 30252 58421 30091 32316 60442

25-29 18006 20843 38849 19880 23012 42892 21949 25407 47355 23446 27140 48993

30-34 13797 15047 28844 15233 16613 31846 16818 18342 35160 17965 19593 36376

35-39 11655 12447 24102 12868 13742 26610 14207 15172 29379 15176 16208 30396

40-44 8457 9106 17563 9337 10054 19391 10309 11100 21409 11012 11857 22149

45-49 7794 8182 15976 8605 9033 17639 9501 9974 19474 10149 10654 20148

50-54 6225 6024 12249 6873 6651 13524 7588 7343 14931 8106 7844 15447

55-59 4829 4510 9339 5333 4979 10311 5886 5498 11384 6288 5873 11778

60-64 4257 3996 8253 4700 4412 9112 5189 4871 10060 5543 5203 10408

65-69 2508 2656 5164 2769 2932 5701 3057 3238 6295 3266 3458 6512

70-74 2145 2498 4643 2368 2758 5126 2615 3045 5660 2793 3253 5855

75-79 1393 1613 3006 1538 1781 3319 1698 1966 3664 1814 2100 3791

80+ 2290 3215 5505 2528 3550 6078 2791 3919 6710 2982 4186 6942

Age N/S 61 59 120 67 65 132 74 72 146 79 77 151

TOTAL 279081 276480 555561 308124 305252 613376 340189 337020 677209 363399 360012 723411

Source: KNBS (2009), KPHC

(Age NS = Age not shown)

According to the table, in 2012 the categories between 0-4 and 5-9 age groups had the

largest populations of 101,043and 101,312. The gender distributions in the same age groups

were 51 per cent male and 48 per cent female respectively for the 0-4 age group and 5-9 age

groups. The cohorts with the lowest population are those whose age is between 75-79 years,

with 46 per cent male and 53 per cent female.

1.4.2. Population density and distribution

The population density is influenced by the climatic conditions, topography, soil

composition, infrastructure and land ownership. Table 4 shows the population density and

distribution in the county. The county's average population density was 50 persons per

square kilometer in 2009 and is projected to be 55 in 2012 and approximately 60 by 2017.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 32

Figure 6:Population trends in Baringo Count

Table 4: Population distribution and density

Sub County Area 2009 Census 2012 Projections 2015 Projections 2017 Projections

Population Density Population Density Population Density Population Density

Mogotio 1325 60,959 46 67,303 51 74307 56 79376 60

Koibatek 1002 105,273 105 116,228 116 128324 128 137079 137

Marigat 1663 73,177 44 80,792 49 89200 54 95286 57

Baringo Central 803 89,174 111 98,454 123 108700 135 116116 145

Baringo North 1705. 93,789 55 103,549 61 114325 67 122125 72

East Pokot 4592 133,189 29 147,049 32 162352 35 173429 38

Total/ Average 11,090 555,561 50 606,060 55 661148 60 700628 63

Source: KNBS, Baringo 2012

As indicated in Table 2, East Pokot Sub-county has the highest population of 133,189

followed by Eldama Ravine Sub-county with a population of 105,273 (according 2009

Population and Housing Census). The sub-counties with the lowest population are Mogotio

and Marigat. The settlement pattern in the county is influenced by urbanization and

availability of arable and grazing land. The county is predominantly inhabited by the Tugen

community. The Ilchamus, Turkana, Kikuyu and Nubians communities are the minorities in

the county among a few other sub-tribes. Table 5 gives population projections for selected

age groups. The groups covered include under 1 year, the under 5 years, primary school age,

secondary school age, youthful population, female reproductive age, the labor force and the

aged.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 33

Table 5:Population projections for selected age groups

Age group

2009

(Census) 2012 (Projections) 2015 (Projections) 2017 (Projections)

Male Female Total Male Female Total Male Female Total Male Female Total

Under 1 year 9813 9275 19088 10834 10240 21074 11962 11306 23266 12778 12077 24855

Under 5 years 56734 53651 110385 62638 59234 121872 69157 65399 134555 73875 69860 143735

Primary school Age

(6-13) 73187 69479 142666 80803 76709 157513 89212 84692 173905 95299 90471 185769

Secondary School

age (14-17) 30614 27894 58508 33800 30797 64598 37317 34002 71319 39863 36322 76185

Youth Population

(15-29) 75407 76302 151709 83254 84242 167497 91918 93009 184928 98190 99355 197545

Female reproductive

age (15-49) 121084

0 133685 133685 0 147597 147597 0 157667 157667

Labour force (15-64) 132421 135614 268035 146202 149727 295928 161416 165308 326725 172429 176587 349016

Aged Population

(65+) 8397 10041 18438 10834 10240 21074 11961 11306 23268 12778 12077 24855

Source: KNBS, 2012

Below is an analysis of the population projections for the selected age groups based on the

figures in Table 5:

Figure 7: Population distribution by age

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 34

Figure 8: Population Distribution by Age

Under 1: The population below the age of one year was 19,088 in 2009 and is projected to

rise to 21,074 in 2012 and 24,855 in 2017. This age group will grow at a low rate, thus the

pressure on the population to provide for this age group will be minimal. There is need,

however, to improve the facilities that cater for this age group in order to correspond with

the increased population.

Under 5: This population is projected to grow from 110,385 in 2009 to 121,872 in 2012

before rising further to 143,735 in 2017. There is need to increase the immunisation

coverage to improve child survival rate. Early Childhood Development (ECD) centres and

other educational facilities should be provided in order to accommodate the increased

numbers.

Primary school going age (6 -13): The total population in this age group is projected to

increase from 142,666 in 2009 to 157,513 in 2012 and to 185,769 in 2017. This increased

number will constrain the primary education facilities. The county should, therefore, focus

on increasing these facilities.

Secondary school going age (14-17): In 2009, the population for this age group was

58,508. It is projected to increase to 64,598 in 2012 and 76,185 in 2017. There is need to

expand the existing secondary school facilities to cater for the increasing numbers. In

2009/2010 financial year, the government through the Economic Stimulus Programmes

developed centres of excellence in the county but more needs to be done.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 35

Youth population (15-29): From the 2009 census, the county had a total of 151,709 with

male and female population being 75,407 and 76,302 respectively. This represents an

average of 30% of the total population, indicating that the county has a high demand for

middle level training colleges.

Female reproductive age (15-49): This group comprises of the female reproductive age.

The total female reproductive age population was 121,084 in 2009 and is projected to be

133,685 in 2012 before rising to 157,667 in 2017. This implies that there is a need to

increase resources going towards improving maternal and child care health services and

nutrition standards. In addition, there is need to intensify reproductive health and family

planning education in order to check population growth in the county.

Labour force (15-64): The County‘s labour force in 2009 was 268,035 and is projected to

rise to 295,928 in 2012 before rising further to 349,016 in 2017. The bulk of the labour force

is either semi-skilled or unskilled and is mainly engaged in agricultural activities. This calls

for more investments in job creation opportunities in the county to absorb this ever-

increasing population.

The aged (65 years and above): The 2009 aged population was 18,438, and it is projected

to increase to 21,074 in 2012 and 24,855 in 2017. There is need to upscale programmes

catering for the aged, including increasing funding from the cash transfer programme.

Table 6 shows population projections for the urban centers of Timboroa, Marigat, Maji

Mazuri, Mogotio, Eldama Ravine and Kabarnet.

Table 6: Population projections by urban centre

Urban centre

2009

(Census) 2012 (Projections) 2015 (Projections) 2017 (Projections)

Male Female Total Male Female Total Male Female Total Male Female Total

Timboroa 1551 1599 3150 1712 1765 3478 1891 1949 3840 2020 2082 4102

Marigat 3303 3358 6661 3647 3707 7354 4026 4093 8120 4301 4373 8673

Maji Mazuri 2193 2072 4265 2421 2288 4709 2673 2526 5199 2856 2698 5554

Mogotio 1808 1893 3701 1996 2090 4086 2204 2307 4511 2354 2465 4819

Eldama Ravine 8711 9161 17872 9618 10114. 19732 10618 11167 21785 11343 11929 23272

Kabarnet 8218 9427 17645 9073 10408 19481 10017 11491 21509 10701 12275 22976

Total 25784 27510 53294 28467 30373 58840 31430 33534 64963 33574 35822 69396

Source: KNBS, Baringo, 2009

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 36

Figure 9: Urban Population in Baringo

There are two major urban centres in the county, namely, Kabarnet and Eldama Ravine.

Timboroa, Marigat, Maji Mazuri and Mogotio are growing and need urgent proper urban

planning to avoid slum dwellings. The town with highest population in 2009 was Eldama

Ravine with a population of 17,872 followed by Kabarnet with 17,645. The population for

the two towns is projected to be 19,732 and 19,481 respectively, in 2012.]

1.5. Human development indicators

The Human Development Indicators (HDI) measure human development based on the basic

factors of a long and healthy life, the acquisition of knowledge and a reasonable standard of

living. These factors are measured by considering aspects such as education, healthy living,

access to social amenities, the position and condition of women and gross domestic product.

Figure 10: Comparison of Human Development Indicators in Baringo against national figures

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 37

Indicator County Index National Index

Human Development Index 0.5656 0.5506

Youth Development Index 0.5952 0.5817

Gender Development Index 0.50

Human Poverty Index 0.30 0.29

Figure 11: Human Development Indicators in Baringo

From the human development report of 2009, the human development index for the county

is 0.5656 which is above the national average of 0.5506. The human poverty index is 30.6

per cent compared to the national level of 29 per cent.

1.5.1. Youth Development Index (YDI)

The YDI is a composite measure of youth development. The index is a tool developed to

raise visibility of youth issues by monitoring the changes that occur in the youth over time.

The youth development index at the county is 0.5952, which is above the national index,

which is 0.5817

1.5.2. Gender Development Index (GDI) and Gender Empowerment Measure

(GEM)

The GDI is a measure of human development that adjusts the HDI for disparities between

men and women. It is, therefore, not a measure of gender inequality. GDI is a basic measure

of how gender inequalities in knowledge acquisition, longevity and health, and standard of

living affect human development.

GEM measures gender equity in political and economic power by assessing the level of

female representation. It considers gender gaps in political representation, professional and

management positions, and earned incomes. It captures gender inequality in political

participation, as measured by the percentage of seats held by women in national parliaments;

economic participation and decision-making power, measured by the percentage of women

among legislators, senior officials, and managers in professional and technical fields; and

power of economic resources measured by the estimated earned income of women and men.

On the other hand, the gender development index for the county is 0.50 per cent. The above

indices show that the county is generally underdeveloped.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 38

1.5.3. Summary of socio-economic indicators of Baringo County

Table 7 Socioeconomic indicators in Baringo County

Year Indicator Value

(%)

2009 Urban households access to electricity 38.5

2009 Rural households access to electricity 4.7

2009 Access to main sewer, septic tank or cess pit urban 0.3

2009 Access to main sewer, septic tank or cess pit rural 7.6

2009 Pre-primary education 17.5

2009 Primary education 67.7

2009 Secondary education 11.7

2009 Tertiary education, university or youth polytechnic 3

2005 Incidence of flu 45.9

2005 Incidence of fever/malaria 14.9

2005 Kenya average flu incidence 15

2005 Kenya average Fever/Malaria incidence 41.4

2009 Employed (age 5 and over) female rural 83.5

2009 Seeking jobs (aged 5 and over)female rural 30.3

2009 Economically inactive (aged 5 and over)female rural 4.7

2009 Employment status unclassified (aged 5 and over)female rural 43.9

2009 Employed (age 5 and over) male rural 82.7

2009 Seeking jobs(aged 5 and over) male rural 37.8

2009 Economically inactive (aged 5 and over) male rural 5.8

2009 Employment status unclassified (aged 5 and over)male rural 32.1

2009 Employed (age 5 and over) female urban 85.1

2009 Seeking jobs (aged 5 and over)female urban 31.6

2009 Economically inactive (aged 5 and over)female urban 6.7

2009 Employment status unclassified (aged 5 and over) female urban 43

2009 Employed (age 5 and over) male urban 82.4

2009 Seeking jobs (aged 5 and over) male urban 39.6

2009 Economically Inactive (aged 5 and over)male urban 7.7

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 39

Year Indicator Value

(%)

2009 Employment status unclassified (aged 5 and over)male urban 31.9

2005 Morbidity rates male 29.3

2005 Morbidity rates female 34.2

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 40

1.5.4. Poverty levels

The chart below indicates the poverty rankings of Kenyan counties. As can be seen, with 60% poverty, Baringo is 15th

.

Figure 12: Poverty rankings of Kenyan counties (Source: Gok, 2011)

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 41

1.6. Infrastructure and access

1.6.1. Road, rail network, airports and airstrips

A modern and well-maintained physical infrastructure is a key catalyst to economic growth

and poverty reduction. The county does not have a good road network. It has a total

2912.55km of road with Class D, E, G, R and U having 339.22km, 1810km, 20.85km,

185.11km, and 557.37k respectively. The roads are mainly earth and mixed type. These

roads are usually impassable during the rainy season. This impedes livestock marketing,

which is the main source of livelihood for majority of the residents. There are four airstrips

in the county and no airport, ports or jetties.

Table 8: Road network in Baringo County

Class Description Length (Km)

A International link roads LAPPSET Proposed

100km

B National trunk roads – linking provinces and counties

C Primary roads – linking important centres or to higher class roads

D Secondary roads – linking important centres together 339.22

E Minor roads – linking minor centres 1810

G Government roads 20.85

R Rural access roads 185.11

S Sugar roads 0

T Tea roads 0

U Unclassified roads 557.37

W Wheat roads 0

2912.55

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 42

Baringo County also has the following aviation facilities

Table 9: Airstrips and airfields in Baringo County (Source: Chief Warden-KWS)

Airstrip Condition Remarks

Kabarnet

Airfield

Serviceable

Tarmacked with1.7km runway

Gazzetted

Has an all-weather access road to Kabarnet town, parking bay

and security housing. Urgently requires rehabilitation as well as

windsock replacement.

Kimalel Airstrip Partially serviceable

Dirt surface

Gazzetted

Apron and access under encroachment

Marigat Airstrip Unserviceable

Dirt surface

Gazzetted

Apron and access under encroachment

Lake Baringo

Airstrip

Serviceable

Dirt surface

Gazzetted

Currently handling tourist traffic.

Urgently requires rehabilitation and facility provision. On the

western shores of the lake

Loboi Landing

Strip

Unserviceable

Not gazzetted

Airstrip has been submerged in Lake Bogoria

Eldama Ravine

FTC Airstrip

Unserviceable and Gazzetted Land under cultivation. Urgently requires restoration

Kamara Airstrip Disused and decommissioned Area demarcated for settlement

Tinomoi

Landing Strip

Disused Land under dispute

Kiserian

Airstrip

Currently under reconstruction On the eastern shores of Lake Baringo

Mukutani

Airstrip

Partially serviceable Needs rehabilitation

Loruk Airstrip Disused Urgently requires reconstruction. Land is available and has

been set aside.

Tangulbei

Airstrip

Disused Urgently requires reconstruction. Land is available

Churo Airstrip Disused Urgently requires reconstruction. Land is available

Arus Aistrip Serviceable Needs rehabilitation and expansion

Nginyang

Airstrip

Serviceable Needs rehabilitation and expansion

Maron Airstrip Disused Needs rehabilitation

Kapedo Airstrip Partially serviceable Needs rehabilitation. Jointly used by Baringo and Turkana

Barpelo Airstrip Not in use N/A

Ngoron Airstrip Never took off Land available

Kinyach

Airstrip

Serviceable Needs expansion

TukTuk Proposed Land available – under grazing

There are several helipads in all the sub-counties though not officially gazetted. All landings

are at the discretion of the pilots. These include school playfields, forest glades, bare hilltops

and open grasslands.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 43

1.6.2. Posts and telecommunications: Posts offices, mobile telephony and

landline

The Postal Corporation of Kenya and other registered courier operators currently provide

mail and parcel delivery services in rural and urban areas with nine post offices in various

urban areas across the county. Most of the fixed telephone lines provided by Telkom Kenya

in the county have been vandalised. However, there is mobile telephone coverage in various

parts of the county in varying degrees. Koibatek Sub County has the highest mobile phone

coverage in the county with 65.3 per cent, while East Pokot has the lowest mobile phone

coverage of 16.8 per cent. Generally the county has an average mobile coverage of 45 per

cent, which is very low.

1.6.3. Financial Sector: Banks, SACCOS and Micro-Finance Institutions

The main banks operating in the county are: Kenya Commercial Bank, Barclays, Equity

Bank and Transnational Bank, all of them in major urban areas. Some of these banks use

agents to dispense their services in the local shopping centres and villages.

Post Bank, KADET, KWFT and Faulu also have a presence in the county. Other financial

institutions in the county are: Baringo farmers SACCO, Boresha Sacco, Sabatia Farmers

Co-operative Society and Torongo Farmers Co-operative Society.The county is also

extensively served with mobile money transfer agents.

1.6.4. Education institutions

The county has 656 primary schools with total enrollment of 143,017pupils. Since the

introduction of free primary education, remarkable improvement in enrollment has been

observed. The county‘s performance in national examination has greatly improved over the

years in spite of the unique challenges facing pupils.

On the other hand, there are 125 secondary schools with a total enrolment of 27,374 students

as at 2012. Among notable challenges facing the sector include, harsh climatic conditions,

especially in the lower parts of the county, insecurity that often results in the closure of

some schools, poor infrastructure, prolonged drought, recurrent floods, high illiteracy rates

and retrogressive cultural practices.

Development of human capital through capacity building programmes is one avenue for

creating resilient communities. Education is important in achieving this objective as it

inculcates skills and competencies necessary for productive participation in economic

activities. However, Baringo County education sector is characterised by low enrolments,

low retention and transition rates and low completion rates. The high school dropout and

low transition are attributable to insecurity, food insecurity, retrogressive cultural practices,

spatially inadequate education infrastructure and poor staffing levels. The county

government shall support and partner with development agencies in peace building efforts

and peace-dividend project/programmes, upscale and expansion of diverse school feeding

programmes, including food-for-education initiatives, investment in low cost boarding

schools, establishment of income-generating activities (IGAs) in boarding schools to support

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 44

initiatives for child rescue from FGM and early marriages. The county government shall

also mobilise resources for consistent funding for education bursary schemes, ECD facilities

and improvement of staffing by training and deployment of teachers. It shall also support

informal education and vocational training programmes by funding establishment and

staffing of relevant institutions.

The county has 12 polytechnics, one public teacher training college, six commercial colleges

and one university campus. The adult literacy classes‘ enrollment as of 2011 was 2,506.

1.6.5. Energy access

In the recent past, the government, through the rural electrification programme in

collaboration with the Kenya Power Company, has increased the electricity connectivity in

the rural areas of the county. Electricity connections in the county stand at 10,400 with a

connection of 2,346 connections in the year 2010-2011 alone.Baringo County has a potential

of geothermal energy production around Lake Bogoria and Silale in East Pokot. Tullow Oil

Company has established a base in the county, Block 12A, to conduct oil exploration.

Government-owned Geothermal Development Company has also started drilling geothermal

energy at Silale area in East Pokot Sub County. This new developments will spur

development growth in the county.

The county government shall support and partner with other development agencies to ensure

wider access to energy by households, institutions and businesses. This will attract

investments and open up new opportunities for cottage industry and value addition, which

will lead to increased employment and citizen participation in the county economy. The

county government shall also mobilise resources for research and development of alternative

energy sources that will exploit existing and potential resources such as Prosopis julifera for

electricity generation, Jatropha circus for bio-diesel, locally available biomass for biogas

besides options in geothermal, solar and wind energy.

1.6.6. Markets and urban centres

There are two urban centres in the county: Kabarnet and Eldama Ravine. Marigat, Maji

Mazuri, Mogotio, Timboroa and Kabartonjo are upcoming urban centres. None of the urban

centres in the county has a sewerage facility but all are supplied with electricity. Kabarnet,

Eldama Ravine and Timboroa have a good supply of water while Mogotio, Maji Mazuri and

Kabartonjo do not have a good supply of running water.

Under Economic Stimulus Programme Markets, infrastructure was improved with

construction of new structures in Marigat, Baringo North and Mogotio sub counties. Jua kali

sheds were also built in Baringo Central and Mogotio counties.

1.6.7. Housing types

The main types of roofing in the county are corrugated iron sheets at 60 per cent followed by

grass-thatched roofing estimated to be 40 per cent. Other types of roofing are: Tiles, concrete

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 45

asbestos, makuti and mud among others. The main wall materials used in construction in the

county are wood and mud estimated at 66 per cent according to the 2009 national population

and housing census. This is followed by wood only at 33 per cent. Other walling materials are

stone, brick and block, mud and cement, corrugated iron sheets, grass/reeds and tin, among

others.

Government housing facilities in the county are few. In Baringo Central, there are 170

government houses while in Mogotio and Eldama Ravine there are 214 housing units.

1.7. Land and land use

The county can be divided into two major zones: the highlands and the lowlands. The higher

elevations of the county are in the modified tropical zones with soils that are generally well

drained and fertile. This zone contains the high potential areas for agricultural and improved

livestock development. In the Tugen Hills, coffee is grown in small scale while food crops like

cereals, fruit trees and horticultural crops are also cultivated. These agricultural activities are

combined with elaborate soil conservation measures. In the southwest part, there is large-scale

farming of cereals and horticultural crops, while Kerio Valley has potential for cotton

production.

The lowlands are in a semi-arid to arid climatic zone. They have complex soils with various

textures and drainage conditions which have developed from alluvial deposits. Some of these

soils are saline. A large area is characterised by shallow stony sandy soils with rock outcrops,

volcanic ash and lava boulders. This zone is essentially a rangeland and apart from scattered

isolated pockets of dryland subsistence agriculture and small-scale irrigation in Marigat,

Kollowa and Barwessa, the major socio-economic activities centre on livestock and bee

keeping.

Although much has been done, a large part of the county‘s potential is yet to be developed.

Most of the highlands can be developed by the introduction of effective and efficient methods

of soil conservation and land management. In the lowlands, the main issue is lack of adequate

moisture for crop growth. This means development of adaptable rainwater harvesting and

storage technologies, irrigated cultivation and introduction of drip irrigation and drought

resistant crops can improve the livelihoods of the farmers in the area. Indeed, adaptable land

use planning and zoning is necessary but not limited to designation of rural and urban

settlements, irrigation, rangelands, conservancies and riparian areas.

The county government shall invest in, and support development partners in community

mobilisation and capacity building on adaptable technologies responsive to the adverse impacts

of climate change and ASAL conditions. This will aim at creating settlement zones away from

areas mapped as disaster prone, while allowing for mechanisation and other adaptable

technologies, which enhance economies of scale and sustainable natural resource use.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 46

Table 10: Land use patterns in Baringo County

Status of land Ideal land use

45% too steep or too dry for agriculture (Inner lowland and lower midland ranching zones) except in alluvial

valley soils with ground water suitable for irrigation

35% semi –arid, risky for agriculture Maize, sunflower and marginal cotton are grown on alluvial pans

with ground water. Good for cotton growing on limited acreage and

livestock keeping.

12% semi-arid, weak

Performance in agro-humid seasons

Maize, sunflower and marginal cotton are grown on alluvial pans

with ground water. Good for cotton growing on limited acreage and

livestock keeping.

From the above map it is clear that the county is majorly semi-arid with few pockets suitable

for intensive agriculture. Mixed farming is mainly found in the highland areas.

Figure 13: Land Use in Baringo (Source: ILRI Data)

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 47

1.8. Mean land holding size

From the above map it is clear that the county is majorly semi-arid with few pockets suitable

for intensive agriculture. Mixed farming is mainly found in the highland areas whereas

pastoralism is majorly practiced in arid regions. Average land holding in the county is

approximately 2.5 hectares per household. In most parts of the county, the land has not been

demarcated and pastoralism is practiced.

1.8.1. Percentage of land with title deeds

Most land in the county is under trust and is owned by the community. About 30 per cent of

land is demarcated and owners issued with title deeds. Eldama Ravine and Baringo Central

sub counties have the higher numbers of title deeds issuance compared to Baringo North,

Marigat and East Pokot sub counties.

1.8.2. Landlessness in Baringo

The county has low incidence of landlessness since most of the land in the county is

communal. However, there is presence of squatters near the urban centers of Mogotio and

Marigat.

1.9. Community organisations/non-state actors

There are various community organisations operating in the county and are mostly involved

in relief operations, water actitivies, HIV and AIDS, civic education and disaster

management. Some operate under religious organisations while others are under the

communities. Development activities undertaken by these organisations vary both in nature

and magnitude. Some have small focal areas like sub counties, divisions, locations or sub-

locations where health and sanitation services, food production and nutrition, and early

childhood education activities are being undertaken. Some Community Based Organisations

(CBOs) are engaged in health, childcare, civil education, environment conservation and

community capacity building. Some women groups are engaged in dairy, poultry farming,

tree nursery, HIV and AIDS and revolving loans, among other activities.

The county government through the County Disaster Risk Management Committee shall

enhance community organisation by supporting participatory processes for DRR

mainstreaming and formation and capacity building of community DRR organisations and

structures. This will lead to improved community capacities to manage disasters and

spearhead implementation of programmes for resilience building. The main objective of this

approach will be to end disaster emergencies in order to unlock resources for development

initiatives.

1.9.1. Cooperative societies

The Co-operatives Department in Baringo promotes guides and supervises the activities of

all types of cooperative societies to ensure viable development and to improve the members‘

economic well being. There are approximately 146 registered cooperative societies in the

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 48

county. Out of these, 82 are active, while 66 are dormant. Total membership is 87,998 —

68,626 males and 19,372 females. Share capital is 2,476,125,040. Gross turnover is

831,947,396. Details are as indicated in the table below.

Type of society Count Status Membership Share capital Gross

turnover

Active Dormant Male Female

Urban Saccos 37 23 14 6,240 3692 2,202,665,385 432,047,206

Rural Saccos 12 7 4 19,930 12,318 249,422,258 127,193

Cotton 3 - 2 - - 40940 -

Coffee 22 17 5 32,767 557 529,192 14,346,666

Jua Kali 3 - 4 - - - -

Transport 2 - 2 - - - -

Multipurpose 5 - 5 - - - -

Dairy 22 11 11 8,470 2,266 18,259,765 335,496,919

Matatu sacco 11 11 - 163 18 338,500 59,412

Consumer Sacco 5 - 5 - - - -

Bee Keeping 4 2 2 220 80 80,000 150,000

Housing 2 1 1 No

records

- - -

Poultry 2 0 2 - - - -

Agricultural 1 1 - - - - -

Unions 2 1 1 - - - -

Ranching/livestock

marketing

6 3 3 354 177 415,000 4,200,000

mining 1 - 1 -- - - -

Cereal

produce&buying

4 2 2 85 35 84,000 3,120,000

Irrigation 3 2 1 278 202 4,200,000 42,000,000

Fisheries 1 1 - 119 27 90,000 400,000

Aloe Vera Utilization 1 - 1 - - - -

TOTALS 149 82 66 68,626 19,372 2,476,125,040 831,947,396

Figure 14: State of co-operative societies in Baringo County as at 31/12/2013

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 49

1.9.2. Non-governmental and international organisations

The following are the non-governmental organisations in the county: Action Aid, ACTED,

World Vision Kenya, Kenya Red Cross Society, International Union for Conservation of

Nature (IUCN), Koibatek Socio-Environmental Organisation (KOSEO) Enderois Welfare

Council, Worldwide Fund for Nature (WWF), SNV –Netherlands, NECOFA, BARECARE,

Women Organization Fighting Against Aids (WOFAK), Habitat for Humanity, Friends of

Ravine Women Empowerment Organisation (FOREWO) and Baringo Advocacy and

Development Organisation (BADO), World Food Programme (WFP) and

UNICEF/UNOPS.

They are key partners in enhancing the socio-economic wellbeing of the county‘s residents.

1.9.3. Self help, women and youth groups

Self-Help groups, women and youth groups play an important role in resource

mobilisationand improving the lives of individuals and families. There are 3375 women

groups, 4610 self-help groups, 2183 youth groups and 85 special groups (people living with

disability, those living with HIV and AIDS and groups of the elderly). They are engaged in

transport, environment, HIV and AIDs, business, dairy farming, tree nursery, revolving

loans, bee keeping, community facilitation, jua kali and training support among other social

economic activities.

1.9.4. Orphans and vulnerable children-cash transfer.

The county is receiving funds under the orphans and vulnerable children cash transfer from

the National Council for Children Services.Currently, 2259 households are in the cash

transfer programme in four sub-counties: Baringo Central, Marigat,Koibatek and Mogotio.

During the 2013 financial year, over KES 54,216,000 was given to the households.

In the 2013/14 financial year, the programme will be scaled up in some uncovered locations

an in East Pokot and Baringo North.

1.9.5. Kabarnet Vocational Rehabilitation Centre (KVRC)

The centre is one of the 14 established nationally with the purpose of providing basic live

skills like carpentry, welding, tailoring, leatherwork and computer training mainly to

persons with disability but also to integrated able-bodied persons. The facility is located on a

20-acreland in Kabarnet town. The courses take between 1-2 years and the participants

graduate with trade test certificate. There are plans of elevating it to offer courses leading to

a diploma certificate. Currently, the centre has 15 trainees and is seeking to recruit more.

The centre is also used as a seminar/conference/training facility to programmes like ECDE,

therefore generating revenue. There is room for further improvement by the county

government and other actors. Over 200 trainees have exited the centre and are gainfully

engaged.

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 50

1.9.6. Marigat Community Capacity Support Programme (CCSP Marigat)

The centre is located in Baringo South Sub-County and was initially established for the

purpose of training mothers on basic nutrition skills to address the malnutrition problem that

was prevalent in the area. However, the centre is currently available as a training facility to

the community and other development partners willing to give training at a fee. Over 25

trainings have been conducted at the centre with over 400 trainees.

1.9.7. GOK grants to community initiatives

These are Government of Kenya grants given to groups as a form of compliment/recognition

for the efforts made by the groups. The groups are then used as models for others. The

benefitting groups are identified by the respective District Gender and Social Development

Committees established popularly by the community group members. During the last

financial year 2012/2013, each sub-county disbursed Sh600,000, bringing the total for the

county to Sh3,600,000. The county government can replicate this.

1.9.8. Older Persons Cash Transfer (OPCT)

This is a national programme that is run in all the constituencies in Kenya. Currently, there

are 170 beneficiaries in each of the sub-counties -- Koibatek, Mogotio, Baringo North and

Baringo East in phase iii. Baringo Central has 732 beneficiaries from phase ii, Marigat has

only 18 beneficiaries, being a replacement from those exiting in Baringo Central. This is

because Marigat had not been declared a constituency of its own by the time of phase iii.

During the next financial, year the national government intends to double the number of

beneficiaries. However, considering the number of eligible applicants per ward is 500, it‘s

important that the county government seeks ways of complimenting the national

government by establishing a county OPCT programme. The current total OPCT grant in

the county as at 2012/2013 financial year is 1,442 beneficiaries x Sh2,000 monthly x 12

months=Sh34,608,000.

1.9.9. People With Severe Disability (PWSD) cash transfer

This is also a national programme operating just like the elderly persons cash transfer above

except that it handles/serves people with severe disability. Currently, each of the sub-

counties apart from Marigat receives 70 beneficiaries Sh2,000x 12 months x 5 sub-counties

bringing the total grant/stipend payment in the county Sh8,400,000. Marigat shares the 70

slots with Baringo Central –Marigat 38 and Baringo Central 32. The county government can

consider establishing PWSD cash transfer programme.

1.9.10. National Fund for the Disabled of Kenya/ National Council for People

with Disability (NFDK/NCPWD)

The two are private and semi-government bodies assisting people with disability with

assistive devices and grants. Assistive devices include wheel chairs, white canes, crutches,

tailoring machines, carpentry and welding tool kits to assist PWDs with movement and

livelihoods. During the last financial year, the NFDK provided 46 pieces of different

COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page 51

assistive devices and Sh200,000 to an institution. The NCPWD provided 106 devices and

Sh1,000,000 to one group. The county government should source for more partners to

enhance this programme so as to cater for the many needy cases.

1.9.11. Women Enterprise Fund (WEF)

This is a national government sponsored programme meant to provide revolving loans to

women groups. The initiative was initiallyrun by the Women Enterprise Fund Secretariat in

Nairobi and using the department of Gender and Social Development and the WEF

volunteers. Up to the last financial year, 2012/2013, more than200 women groups in

Baringo county have benefitted with more than Sh16, 000,000. During the current financial

year, more groups will benefit from the national government pledge of Sh3 billion.

However, the county needs to enhance the utilisation of this facility.

1.10. Crop, livestock and fish production

1.10.1. Main crops produced

Crops grown in the county are: Maize, finger millet, sorghum, beans, cowpeas, green grams,

garden peas, Irish potatoes, sweet potatoes. Beans and maize cover the largest acreage in the

county while Irish potatoes and garden peas cover the lowest acreage. Maize and beans are

mainly grown in the highlands while finger millet and sorghum are grown in the lowlands.

Maize is the leading food and cash crop in Baringo County, but, its production has been low

due to poor rainfall distribution and poor crop husbandry. Coffee has registered a decreasing

trend in production due to high costs of production and erratic market prices. Although

coffee prices have recently been favourable, the production has remained low due to

previous neglect of the coffee bushes by the farmers.

Baringo achieved 309 hectares in 2012 that yielded 17,167 bags of rice worth Sh108 million

and is currently targeting 500 hectares expected to produce 27,000 bags. To improve the

county‘s food security, the county government shall support, promote and partner with

development agencies on programmes integrating in situ rainwater harvesting technologies,

flood recession agriculture and harnessing of streams and rivers to expand irrigation

command land. The county government shall also support development and implementation

of programmes that conserve the environment and catchment areas. It will also support those

that ensure sustainable natural resource use and disaster risk reduction. The county

government shall mobilise resources to support ongoing and new community-managed

livelihood projects.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 52

1.10.2. Acreage under food crops and cash crops

Baringo achieved 309 hectares in 2012 that yielded 17,167 bags of rice worth Kshs.

108 million and is currently targeting 500 hectares expected to produce 27,000 bags.

The table below shows the agricultural output of the county.

2011 2012 2013

CROP Achieve

d area

(HA)

Producti

on

bags/tons

Value

(KES)

Achieve

d area

(HA)

Producti

on bags /

tons

Value

(KES)

Targe

ts

Producti

on

bags/tons

Maize 35,184 609,397 1,615,287,4

96

36,062 746,809 2,233,148,0

00

42,550 950,400

Beans 16,017 100,268 668,679,47

5

16,417 80,186 384,140,00

0

22,510 220,830

Sorghum 860 8,869 23,912,500 1,100 10,341 26,831,000 1,791 25,962

Finger

millet

3,128 28,308 109,084,00

0

3,546 31,300 132,334,00

0

4,239 53,539

Cowpeas 665 1,447 22,609,700 557 2,225 26,364,800 1,004 8,005

Green

grams

383 2,019 23,764,000 563 1,746 15,573,600 885 7,680

Cassava 97 1,000 12,845,000 105 961 10,005,000 117 2,230

Sweet

potatoes

179 855 11,182,000 234 1,448 14,063,000 406 5,053

Coffee 811 2,278 12,280,000 816 1,396 10,420,000 823 1,404

Cotton 955 527 22,338,000 872 634 22,003,000 890 609

Macadam

ia nuts

92 181 10,651,000 152 207 12,430,000 164 272

Groundnu

ts

994 1,902 10,714,000 1,020 3,137 17,818,000 1,285 4,280

Mangoes 181 1,209 13,730,000 201 1,296 18,670,000 187 1,332

Avocadoe

s

63 323 3,196,000 51 325 4,976,000 61 450

Oranges 36 351 5,290,000 35 215 3,540,050 33 197

Lemons 72 216 3,255,544 52 193 3,121,000 46 172

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 53

2011 2012 2013

CROP Achieve

d area

(HA)

Producti

on

bags/tons

Value

(KES)

Achieve

d area

(HA)

Producti

on bags /

tons

Value

(KES)

Targe

ts

Producti

on

bags/tons

Passion

fruits

22 268 8,060,000 28 208 7,400,000 30 214

Paw paws 79 999 12,461,000 75 975 13,910,000 50 895

Bananas 161 1,215 13,950,000 178 2,121 24,230,000 185 2,644

Onions 89 663 17,105,000 60 419 12,660,000 116 769

Water

melons

67 498 4,307,500 67 638 6,810,000 145 1,420

Tomatoes 138 1,237 30,846,250 119 1,039 19,200,000 235 1,560

Kales 171 1,166 10,780,000 167 968 15,870,000 292 1,240

Cabbages 114 880 6480000 92.5 666.5 35490000 184 1840

TOTAL 60,694 764,478 2,672,808,4

65

62,062 888,228 3,071,007,4

50

77,445 1,292,815

Figure 15: Crop Production Estimates for Baringo County

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 54

Figure 16: Income distribution among cash crops

1.10.3. Average farm sizes

The average farm size is 2.5ha. Landholding in the county varies from one sub-county

to another. Whereas landholding in the southern part of the county, that is, Koibatek

Sub-Sounty, averages 2.5ha and demarcated with title deeds, land is still communal

and managed by the community inthe northern part, that is, the East Pokot Sub-

County.

1.10.4. Main storage facilities

Most farmers still use traditional mode of storage, that is, granaries, to store harvests

for subsistence. The county is also served by the National Cereals and Produce Board,

which has four depots in the county that are located in Eldama Ravine, Marigat,

Kimalel and Kabarnet. The stores assist farmers to store surplus produce.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 55

1.11. Livestock population

The livestock production output of the county is summarised below:

Table 11: Livestock production in Baringo County:

Species/

Type

Total 2012 Total 2011 Total 2010

Cattle Dairy 159,383 118,627 95,092

Zebu 372,379 342,589 315,181

Goats Meat 948,642 921,904 850,608

Dairy goats 3,074 2,809 2,345

Crosses 689 633 583

Sheep Hair 304,848 277,411 257,992

Wool 19,556 17,795 16,550

Dorper 24,680 22,458 20,887

Others 56,257 50,293 46,772

Poultry Indigenous 1,018,381 814,704 657,763

Layers 50,420 45432 40889

Broilers 14,800 13,320 11,988

Ducks 2,757 2,919 2,488

Turkeys 1,718 1632 1,550

Geese 814 773 734

Beehives KTBH 12,517 12,144 11,536

Langstroth 2,341 2,270 2,156

Log hives 126,007 122,226 116,115

Donkeys Donkeys 13,660 12,977 12,328

Rabbits Rabbits 4,904 4,659 4,426

Pigs Pigs 137 116 98

Camels Camels 10,189 10,189 9,680

Emerging livestock Ostrich 125 118 112

G/ fowls 0 0 0

Doves 799 759 721

The main livestock in the county include the East African Zebu Cattle in the lowlands and

exotic cattle in the highlands of Baringo Central and Koibatek Sub-Counties. Other activities

include bee keeping and honey production, hides and skins. To improve on income and

livelihood diversification, the county government will support programmes on value addition

in among others honey, meats, fish, hides and skins, poultry, dairy, rabbit and pasture/hay

storage, while prioritising programmes on diversification to emerging livestock, including

ostriches, guinea fowls, doves, crocodiles, camels, snakes and termites.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 56

1.11.1. Contribution of livestock to the economy

Table 12: Proceeds from the sale of live animals (2012)

Species Number Average price

(Kshs)

Total Value

(Kshs)

Cattle 25,269 17,250 435,890,250

Goats 57,757 4,250 245,467,250

Sheep 14,340 2,250 32,265,000

Chicken (local) 246,696 275 67,841,400

Broilers 14,371 340 4,886,140

Culled layers 2,566 250 641,500

Camels 1,738 27,500 47,795,000

Donkeys 135 5,000 675,000

TOTAL 835,461,540

Table 13 shows the proceeds received by Baringo Farmers from the sale of livestock products

in 2012.

Table 13: Proceeds from the sale of livestock products (2012)

Item/unit Quantity (kg) Unit price/kg Total Value (kshs).

Milk 12,891,815 35 451,213,525

Beef 695,380 300 208,614,000

Mutton 196,755 400 78,707,000

Chevon 476,361 400 190,544,400

Camel meat 180 400 72,000

Eggs/Tray 997,670(trays) 240 239,440,800

Crude honey/kg 435,113 200 87,022,600

Wax 225 500 112,500

Hides 21,358 35 747,530

Goat skin 248,087 182.50 45,275,878

Sheep skin 30,893 182.50 5,637,973

Total 1,307,388,206

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 57

Table 14: Projected revenue estimates based on potential production

Item/unit Annual revenue

estimates 2013

Annual revenue

estimates 2014

Annual revenue

estimates 2015

Milk 812,184,345 852,793,550 955,128,755

Beef 208,614,000 369,288,600 546,547,200

Mutton 173,144,400 188,727,200 217,036,400

Chevon 318,209,200 353,212,400 409,726,000

Camel meat 24,000,000 25,200,000 27,972,000

Eggs/Tray 957,763,200 1,206,781,680 1,580,883,840

Crude honey/kg 574,349,200 735,166,800 827,062,800

Wax 22,500,000 27,225,000 34,303,500

Hides 1,248,345 1,323,245 1,482,005

Goat skins 75,610,663 83,927,735 97,356,266

Sheep skin 12,528,806 13,659,943 15,704,855

TOTAL 3,180,152,159 3,857,306,153 4,713,203,621

1.11.2. Number of ranches

There are several group ranches within Baringo County. Those neighbouring urban centres

have been encroached by the expanding towns.

Group Ranch Size

(HA)

Type Current status

Marigat G.R 8757 Group Has 438 members,fully registered and allowed to subdivide

Kimalel G.R 6073 Group Has 655 members, fully registered and allowed to

subdivide

Sabor G.R 8100 Group 651 members fully, registered allowed to subdivide

Kokwa Island 506 Group 116 members, fully registered No subdivision requested

Ngambo G.R 5501 Group 1659 members, not registered

Salabani G.R 7522 Group 857 members, not registered

Eldume G.R 5052 Group 671 members, dispute with Sandai adjudication section

Bakibi ‗A‘ G.R 6443 Group 801 Members, fully registered, no request for subdivision

Barkibi ‗B‘ G.R 6443 Group 250 members, fully registered, subdivision allowed

Bartum Ranch 19,086 Group Not registered group numbers

Ngaratuko Ranch 1,900 Group Not registered due to dispute

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 58

1.11.3. Main fishing activities

There are over 400 fishing households in Lake Baringo and 700 fish farmers with

fishponds in the county. In the recent past, 35 dams have also been stocked with

910,000 fingerlings mainly of the Tilapia and Clarias species. Fishponds in the county

occupy over 184,000 square metres. The main fish species are protopterous (lung

fish), tilapia and clarias. Fish farmers obtain their fingerlings from Omega farm,

Kokwo Island, Lake Baringo or Jewlet Farm, Kendu Bay, Homabay County at a price

of between Sh7 and Sh11. The survival rates are estimated at 90%. The fishing gear

being used by the fishermen are: Fishing nets, hooks, traps, motorboats and canoes.

The total value of fish is approximately Sh11.8 million.

1.11.4. Forestry and agro-forestry

The forest resources in the county are important assets for the provision of basic

needs, conservation and improvement of physical conditions of the county. They

supply essential wood products, employment opportunities, revenue collection base,

control soil erosion and conserve of water catchment areas.

1.11.5. Main forest types and sizes of forests

Baringo County has 65,280.4ha of forests, which are gazetted. The established

plantations cover an area of 13,940ha, while the rest is natural forest. The distribution

of forests within the county is shown in Table 9. Cases of felling of cedar, podo and

osyris lanceolata as well as sandal wood harvesting and charcoal burning are a threat

to the forest cover in the county.

1.4.1 Table Distribution of Forests in the County.

Region Area (Ha) Plantation (Ha) Indigenous

(Ha)

Status

E/Ravine, Torongo,

Mumberes and Esageri

42,315.7 14,300 28,315.7 Gazzetted

Kabartonjo 4397.4 300.3 4016.97 Gazzetted

Tenges 9270.0 104.6 9165.4 Gazzetted

Ol Arable/Muchongoi 2973 50.0 2923.0 Gazzetted

Marigat 1392.8 0 1392.8 Trust land

Total 65,280.4 14,885 54,961.17

Source: Zonal Forest Office - Koibatek /Baringo, 2013

1.11.6. Forest products from gazetted and ungazetted forests

The main forest products in the county are honey, wood, timber, posts, poles and

bamboo for fencing.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 59

1.11.7. Promotion of agro-forestry and green economy

Protection of water catchment area: A number of residents depend on the forests to

earn a living. They keep bees, harvest timber and burn charcoal. These actitivies —

charcoal burning and timber harvesting — contribute to deforestation and destruction

of water catchments. The major water catchment areas are Lembus/Koibatek

(northern Mau catchment) to the south, Tugen Hills, Mochongoi and Ng‘elecha to the

east, Amaya and Tiati Hills to the north east and north respectively. Several attempts

have been made by the forest department to protect them. This is by planting trees

along the rivers and lakes and discouraging human settlement near it.The Water

Resources Management Authority (WRMA) together with the communities is making

an effort to manage and plan for resource use and allocation in the county. They do

this by classifying the catchment areas into various categories as follows:

Lake Baringo catchment (foursub-catchments — Perkerra, Molo, Endao and Ol

Arabel), Lake Bogoria catchment (tow sub-catchments — Waseges and Emsos),

Kerio North (five sub-catchments — Kipsaa, Turukwei, Mbara, Kaptich and Yeptos),

and Lake Kamnarok (Pemwai).

The Tiati catchment (comprising Amaya, Nginyang‘ and Kolowa) is based on

seasonal rivers. In this, they plan to make sub-catchment management plans, which

shall comprise 60 water resource users associations. Six have already been completed.

Prevention of soil erosion: Farmers are encouraged to plough 30m away from rivers.

This is to avoid soil from being swept downstream into the rivers. There is need to

plant more trees and increase soil conservation measures like building gabions and

terracing.

Provision of soil fertility by growing nitrogen-fixing trees: The players in the

environmental, water and housing sub-sector will enhance the growing of nitrogen

fixing agroforestry trees to improve the condition of soils used for farming. These

trees capture nitrogen from the air and deposit in the soil through theroots and falling

leaves. They also pull nutrients to the surface, enabling crops with short roots to

absorb them.

Growing of fruits trees: For domestic use and the surplus sold.Mangoes, avocado

and oranges are grown in the high altitude areas of Timboroa and Kabarnet, while

pawpaw, bananas and watermelons thrive in the lowlands of Mogotio and

Marigat.Their full potential is, however, yet to be exploited. Birrea fruit trees are

grown in some parts of Kerio Valley.

Provision of carbon sinks: Towerpower, a private electricity producer, has been

licensed by National Environmental Management Authority (NEMA) to put up a 1.15

megawatts bio fuel plant in Marigat Sub-County. The bio fuel plant will be fed by

residue such as wheat and sisal waste, and earn carbon credits. It willemitan estimated

50,000 tonnes ofcarbon.Geothermal Development Companyis looking to register and

implement Clean Development Mechanism (CDM) projects for Bogoria-Silale block.

This is bound to spur economic growth in the county.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 60

Beautification activities: These are mainly in urban centres, highways, schools,

homes and other public places. Eldama Ravine and Kabarnet towns have benefited

from beautification programmes from the local government funds.

Animal feeds production: Star grass and remnants from farm produce are processed

for the purpose of producing feeds for livestock. To ensure sufficient livestock feed

during periods of scarcity, and especially during disasters, programmes for

rangeland/pasture improvement will be supported and implemented with community

participation for sustainability. To achieve this, the county government shall mobilise

resources for these programmes and also partner with stakeholders to promote and

support DRR initiatives for pasture reseeding, enclosures, deferred grazing and seed

production. It will also support efforts for land reclamation from the invasive

Prosopis juliflora for pasture production and subsequent conservation/preservation as

standing or baled hay to create fodder banks.

Growing and processing for medicinal purposes/value plants and products:

Baringois rich in medicinal value trees. Several indigenous medicinal trees grow

naturally in forests. Aloe Vera and sandalwood are among the most important

medicinal plants in the county. European Union has invested in constructing an

industry in Baringo Central Sub-County.

1.12. Environment and climate change

1.12.1. Major contributors to environmental degradation

One of the greatest challenges facing the county is environmental degradation,

including deforestation, desertification, pollution and climate change — an issue of

increasing concern for the local, national and international community.Overgrazing,

overstocking, unregulated charcoal burning and cultivation of steep slopes among

other factors degrade the environment. With frequent droughts occurring in the

county, the effects are profound.

Oil pollution garages and petrol stations is another environmental

challenge.Workshops disposing off sawdust and waste timber often burn the sawdust,

producing pungent fumes that polute the air. Raw sewage pollutes water hence

environmental risk, but clinical waste is the most hazardous.

The problem of waste management in the county is a serious one. As mentioned

earlier, none of the urban centres in the county has a sewerage treatment system and

there are no formal garbage disposal sites.

Management of plastic waste: The disposal and management of plastic waste

presents a great challenge to the county, more so to the urban areas. The worst

category of plastic is the carrier bags. They are blown by the wind, littering

everywhere, including wetlands and cause a great eyesore. These bags also often

chock and kill animals. Since disposal by burning releases toxic gases into the

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 61

atmosphere, there is urgent need for both the national and county government to

formulate a policy in the use and management of this special category of waste.

1.12.2. Effects of environmental degradation

Environmental degradation in certain parts of the county is severe. Some parts are

covered with deep gullies, especially in East Pokot, Mogotio, Kerio Valley, Arabal

and lower parts of Koibatek. Settlement in protected areasand those with fragile

ecosystemshas adverse effects in the long run. It reduces agriculture and livestock

output and consequently household incomes. It is also likely to cause human-wildlife

conflict and wildlife migration, which will have negative effect on tourism promotion

and the county‘s economy. There are inadequate measures in place to curb this.

Effects of the major environmental problems on both health and productivity include:

a. Water pollution and water scarcity: These are not only a health risk, but

they also increase the cost of production, as residents have to spend more to

get clean water. They also result in declining fisheries and aquifer depletion,

leading to irreversible compaction.

b. Solid and hazardous wastes: Uncollected garbage and blocked drains are

health risks. Thet also afferct productivity through the pollution of

groundwater resources.

c. Soil degradation: Depleted soils reduce productivity.

d. Deforestation: Causes flooding in lower zones of Mogotio and East Pokot

sub-counties. This not only results in destruction of property but also causes

health risks. Loss of sustainable logging potential and of erosion prevention,

watershed stability and carbon sequestration provided by forests are among the

productivity impacts of deforestation.

1.12.3. Climate change and its effects

Climate change leads to an increase in the intensity and frequency of weather

extremes, floods, landslides and droughts. The greatest impact of the effects of

climate change is borne by vulnerable segments of communities who lack the

resilienceor capacity to prepare, adapt and rebuild (recover).

Extreme weather events, such as severe flooding, increase the risk of waterborne and

vector-borne diseases, such as malaria and diarrhea.

1.12.4. Climate change mitigation measures and adaptation strategies

Given the effects of environmental degradation and climate change, there is need for

climate change mitigation. Outlined below are measures thatstakeholders can

implement to mitigate effects of climate change.

Community participation in climate change adaptation will be enhanced to curb

environmental degradation. In addition, environmental education and awareness

training in schools and colleges will be promoted. The county government shall

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 62

support volunteer programmes and formationof ward/sub-county-specific thematic

DRRaction groups to implement climate change and other related disaster mitigation

measures.

Another measure is the intra and inter-county collaboration together with various

climate groups and organisations to better understand the causes and impacts of

climate change.

1.13. Mining

1.13.1. Ongoing activities

A few valuable minerals have been discovered in the county. Opal has been mined at

Isanda near Perkera. Fluorite deposits have been cited in the basement and volcanic

rocks of Tiati Hills while carbon dioxide has been extracted from several boreholes in

the southern part of the county. In recent times, quarrying has gained prominence in

the county, especially in Tenges division where building stones, sand and ballast are

being exploited. There are also abandoned ruby mines at Sandai village near Lake

Bogoria.

1.13.2. Mining potential

The county has a potential of ruby, diatomite, manganese and fluoride mining though

the quantity of deposits is yet to be established. Exploration will need to be carried out

so as to establish the quantity of these mineral deposits. Quarrying is generally done

for building stones, ballast, sand, laterite (murram) and other building and

construction rock material. The proceeds from the sale of minerals in Baringo County

have not been quantified, as the small scale mining activities are not structured.

Tullow Oil Company has set base at the county, Block 12A, to explore oil and if it is

exploited, it will be shared between Baringo and Elgeyo-Marakwet counties.

Government-owned Geothermal Development Company has also started drilling

geothermal energy at Silale area in East Pokot Sub-County.

Baringo County also has carbon dioxide deposits at Esageri, Mogotio Sub-County.

1.14. Tourism

1.14.1. Main tourist attraction, national parks and reserves

The bubbling waters, hot springs, gushing geysers, flamingoes and ostriches are

among the major attractions in Lake Bogoria and Kapedo hot springs. Other wildlife

includes tortoises, large aquatic and terrestrial game. There is also huge potential for

private/community conservancies as well as cultural and agro-eco-tourism tourism.

Baringo County boasts of high class tourist resort centres, among them Lake Bogoria

Spa Resort and Papyrus Inn hotels. Endorois cultural dancersentertain tourists visiting

the lake.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 63

Baringo County shall also diversify the industry and tap into conference tourism

potential by marketing the existing facilities and promoting and encouraging new

investments to complement earnings from other tourist attractions. The county

government shall put in place mechanisms for hotel rating and mobilise resources for

direct investment in suitable facilities while creating favorable climate for private

investment. This will ensure that visitors to the county, including guests of the county

government, are accommodated within the county rather than in neighboring counties

that have superior facilities. Other areas with opportunity for diversification include

education tourism and golf tourism. The county governments will, therefore, support

incentive schemes to enhance educational tourism and actualisation of golfings.

Some forests in Tugen Hills, Laikipia escarpment and Eldama Ravine have beautiful

sceneries that attract regular visitors. Examples are Ol‘Arabel, Tenges, Kipngochoch,

Kabarnet, Katimok and Saimo forests.

Apart from being good catchment areas for birds, wildlife, picnics and eco-tourism,

forests encourage soil conservation through terracing, vegetable growing and

beekeeping.

Lake Baringo has 13 islands and viewpoints that provide magnificent views of the

lake. The largest island is called Ol-kokwe, which in Ilchamus means a meeting place.

The other island is Samatian that is small but with breathtaking views across the

bronze waters of Lake Baringo.

Other interesting tourist locations in the lake are Soi Safari Lodge, Lake Baringo Club

as well as Reptile Park, which is one of the largest reptile parks in the Rift Valley.

Another one is Ruko Wildlife Conservancy that scenic attractions ranging from

wildlife to cultural villages.

Korosoi volcano, which rises 1,449m above sea level, offers an ideal spot for

watching birds such as bat hawks and majestic verreauxs eagle.Kabarnet National

Museum and Kipsaraman Community Museum are located on top of Tugen Hills. The

two museums form unique tourist sites with varied attractions and house traditional

Kalenjin artifacts, which include musical instruments, storage equipments, furniture

and ornamental decorations.At Eldama Ravine, there are the Kursalal falls, a stunning

waterfall within Lembus forests.

1.14.2. Main wildlife

Baringo County has Lake Bogoria National Game Reserve, which is 107km2.The

acacia woodlands in the national game reserve is home to many wild animals, among

them rare kudus, antelopes, zebras, leopards, cheetahs, hyenas, mongoose, monkeys,

baboons and jackals. There are more than two million lesser flamingoes and 350 bird

species, especially along the shores of the Lake Bogoria.

Lake Baringo has 450 bird species such as pale and dark phase gabar goshawk,

paradise flycatcher, African fish eagles, marabou stocks, shikra and white-faced scops

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 64

owl, hemphrick‖s hornbill (along the cliffs),the African darter and occasionally the

African skimmer. Apart from birds, visitors have the opportunity to view crocodiles,

hippopotomus, the imposing Laikipia escarpment as well as the dramatic Tugen Hills.

Lake Baringo Snake Park has snake species such as the black mamba, puff adder,

boomslang and spiting cobra. Other reptiles in the park are monitor lizards,

crocodiles, tortoises and harmless stripes bellied sand snakes.

Table 15: Tourist class hotels/restaurants and bed Capacity

Name of the hotel Bed capacity

Sportsline Hotel, Kabarnet 28

Sinkoro Hotel Ltd, Kabarnet 50

Kabarnet Hotel, Kabarnet 50

Taidy‘s Hotel in Eldama Ravine 64

Chambai Hotel in Eldama Ravine (coming up. 150

Soi Safari Lodge 70

Lake Bogoria Hotel and Spa Resort. 80

Source:K.N.B.S., Baringo County

1.15. Employment and other sources of income

1.15.1. Wage earners

The Kenya National and population census statistics of 2009 show that the total

number of people who are in employment in Baringo County are 190,349 against a

population of 555,561 people. Out of the total workforce, 106,126 are male and

83,223 are female. The wage earners are expected to increase to a total of 207,651

with 115,772 males and 90,788 females.

1.15.2. Self employed

Over 58.9% of the labour force is engaged in small scale farming. This means that

most of the workers are busy during land preparation, weeding and harvesting. Those

engaged in their own farms are underemployed during the off-peak seasons. Those

employed are laid off during the off-peak periods.

1.15.3. Labour force

The labour force is generally the population in the age cohort 15-64 years. With this

age cohort, the participation rate of 92% is always assumed. This is because some

people in this age group are either sick or disabled and cannot participate in economic

production. The selection of 15-64 years should not be interpreted rigidly as there are

those above and below this age cohort who are economically active. The number of

people employed in the county is 190,349. Those seeking employment are 30,348

while the economically inactive are 210,822.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 65

Given that pastoralism is predominant in parts of the county, especially in the arid

areas, many of those under 15 years participate in employment as herds‘ boys.

1.15.4. Unemployment levels

Out of the total labour force in the county, only 32 per cent are in employment and the

rest (68 per cent) are unemployed. The major sources of employment are: Agriculture,

rural self-employed, urban self-employed and wage employment. Wage employment

is the main source of employment in the county, generating about 34 per cent of the

total employment.

1.16. Water and sanitation

1.16.1. Water resources and quality

Being an ASAL county, Baringo has prioritised the provision of water for human,

livestock and for irrigation as a necessary requirement for the general development of

the county. Water shortage is prevalent, especially in Lake Baringo and Lake Bogoria,

parts of Kerio Valley, Mogotio, western slopes of Ng‘elecha (Mochongoi) and the

entire East Pokot (Kollowa to Tangulbei). This is caused by the low rainfall received

and cyclic droughts. This has hindere development of livestock and farming

activities, as people spend many hourse daily looking for water.

Water from Lake Baringo has not been exploited for domestic use and irrigation. The

county government shall support efforts to upscale construction of water pans and

dams in order to solve water shortage, especially during dry seasons.The county

gorverment shall promote opartners to drill boreholes to increase accessibility of clean

water in the county. The recently completed construction of Chemususu Dam in

Koibatek Sub-County is one of the long-term strategies in solving water shortage in

the county. However, it urgently requires distribution system for this purpose. Other

water development initiatives to be supported by the county government include

abstraction of water from rivers, spring protections, harvesting of rain water from roof

and other catchments.The county government shall promote and support efforts for

upstream water catchment protection.

Major rivers like Kerio, Waseges, Emsos, Perkerra and Molo together with their

tributaries could tapped for domestic use and irrigation. Other rivers that may be of

importance, though seasonal, are Amaya, Nginyang‘, Mukutani and Arabal.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 66

Table 16: Water sources for different Households in Baringo County

Sub-County Dam Lake Stream

Springs/

Wells

Piped

Into

Dwelling Piped

Jabia/

Rain

Water

Vendor Other

Baringo

Central 513 861 20106 6768 822 5151 118 422 177

Baringo North 291 915 13120 4577 49 367 103 82 230

East Pokot 2246 536 9394 6280 97 59 60 35 2584

Koibatek 4073 32 15094 5276 957 8046 159 656 393

Total 7123 2344 57714 22901 1925 13623 440 1195 3384

Source: Kenya population and Housing Census Report 2009

1.16.2. Water supply schemes

Water supplies are managed by Rift Valley Water Services Board and the community.

The county has scarce water and most of the population relies on water from the

streams. Phase two of Kirandich Dam in Kabarnet needs to be expanded to serve

higher population as it iscurrently underutilised. The water distribution system needs

to be expanded in all parts of the county.

Thecounty government shall promote, support and encourage implementation of

projects geared towards expanding water supply coverage to communities through

own or partnership initiatives. The county government shall mobilise resources

internally and externally to finance such initiatives.

1.16.3. Water sources (distance to the nearest water points)

The sources of water in the county includedams, lake, water pans, streams, wells,

springs and boreholes. They may be piped water or point sources. Water from

vendors, especially in urban centres and small market centres, constitute a small

percentage. The average distance to the nearest water point is 5km. This is way below

the SHERE Standards on access to water. The county government shall institute

measures and policies that will favour improvement of the existing situation.

Therefore, the county government shall initiate programmes for improvement of

water access and also engage with partners to reduce distance to water points to the

acceptable standard of 30 minutes‘ walk. The Bill on Human Rights lists water as one

of the human rights. Policymakers should put in measures to increase accessibility.

1.16.4. Sanitation

Most of the population does not have access to good sanitation. Households using

bushes to relieve themselves constitute 49 per cent while 46 per cent use pit latrines.

Only five per cent of the population has access to proper sanitation.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 67

There is no sewerage plant in all the towns and trading centres in the county. This

poses a major health and pollution hazard among the residents of Baringo. The county

government shall support and partner with relevant development agencies to promote

sensitisation towards increased latrine coverage as well as mobilising resources for

programmes geared towards Community Led Total Sanitation (CLTS) and promotion

of low-cost latrine construction technologies.

1.17. Education and literacy

Investing in education has a significant social rate of return. There is a positive

correlation between education and individual earnings. The better educated an

individual, the more productive he/she is not only in the market but also in the

household. Therefore, investment in education has benefits to the individual and to the

society as a whole.Baringo County experiences low gross enrolments at secondary

school level and the pastoral areas have the highest girl dropout rates.

1.17.1. Pre-school education

Pre-school education has experienced tremendous growth in the county. They are well

distributed in the five sub-counties. The number of ECD centres in Baringo North

Sub-County is 163 with 326 ECD teachers, while Koibatek Sub-County has 191 ECD

centres with 277 ECD teachers. Baringo Central Sub-County and Mogotio Sub-

County have 403 and 250 ECD centres, respectively.

To encourage enrolment, retention and transition at this level as part of DRR strategy,

the county government shall mobilise resources for construction and expansionto

increase capacities and accessofECD centres. It will enhance staffing levels and avail

requisite equipment and materials. Development partners will be encouraged to

partner and commit resources towards this end. This will include partnerships for

ECD feeding programmes, training and remuneration of ECD teachers, as well as

capital investments.

1.17.2. Special Needs Education [SNE]

The county government has put in place a number of mechanisms to ensure a good

education foundation for children with special needs. A number of programmes exist

but there is still need for teachers with specialised training in various categories of

disabilities to be employed.

The following programmes are distributed as follows in the sub-counties:

Baringo Central 3 schools

Baringo North 2 schools

East Pokot 1 schools

Marigat 2 schools

Mogotio 3 schools

Koibatek 2 schools

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 68

Enrolment of Special Needs Education- Pupils 2013

LEVELS BOYS GIRLS TOTAL

ECCDE [Ages 4 – 9 yrs] 48 41 89

Primary [SNE] 380 296 676

Secondary [SNE]

Marigat Mixed Day 4 3 7

Pemwai Secondary - 2 2

Marigat Secondary 6 3 9

Kapkiamo 1 0 1

TOTAL 11 8 19

Vocational Training Rehabilitation N/A N/A N/A

Youth Polytechnics N/A N/A N/A

Staffing Establishment of SNE in the County

LEVELS MALE FEMALE TOTAL

ECCDE 4 8 12

Primary Schools

Kabarnet D/Blind 20 20 40

Esageri School for Deaf 8 6 14

Others - units / integrated 21 30 51

Secondary Schools 1 - 1

TOTAL 54 64 118

The county government in collaboration with NGOs, CBOs, FBOs and corporate

institutions to solicit funds to facilitate infrastructure and resources so as to realise

MDGs and Kenya Vision 2030.

1.17.3. Primary education

The county has 656 primary schools with total enrollment of 143,017 pupils. Since

the introduction of Free Primary Education, remarkable improvement in enrollment

has been observed. The county‘s performance in National Examination has greatly

improved over the years in spite of the unique challenges which the pupils undergo.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 69

However, the retention and transition rates remain a challenge to attainment of DRR

objects. The County Government shall mainstream issues on retrogressive socio-

cultural practices and pre-occupations by mobilizing resources and partnering with

other development agencies to build, equip and staff schools. Resources shall be

committed by the county government and partners for enhance school feeding

programmes and other education incentives. The County government shall also

support integration of ICT in primary education together with partners.

1.17.4. Literacy

The literacy level of a population is one of the indicators of the population‘s potential

for socio-economic development. This is because the literacy enables those who have

received it to consume a wide body of ideas and often acts towards the fulfillment of

some of the aspirations triggered by those ideas. East Pokot has an illiteracy level of

76 per cent the highest in the county. The lowest illetaracy level is 9.1 per cent,

according to National Population and Housing Census, 2009. This gives an average of

28 per cent, which is very low.

The county government shall, together with partners, mobilise resources to support

literacy programmes. This will generally target all community members that lost out

on opportunity for formal education for reasons including FGM, early marriages and

other socio-cultural reasons as well as poor transition and incompletion of formal

education. The specific programmes should establish centres for informal

education,equip and staff them and also establish functional vocation training centres.

To motivate enrolment and retention, the county government and partners shall

provide employment opportunities for those that successfully complete life skill

trainings.

1.17.5. Secondary education

There are 125 secondary schools with a total enrolment of 27,374 students as at 2013.

Among notable challenges facing the sector include harsh climatic conditions,

especially in the lower part of the county; insecurity, which often results in closure of

some schools; poor infrastructure; floods in the low lands; prolonged draught; high

illiteracy rates among parents and retrogressive cultural beliefs. The county

government shall operationalise a bursary scheme for needy students and those

rescued from retrogressive socio-cultural practices and pre-occupations. The county

government, together with partners, shall support establishment of low-cost centres of

academic excellence within each sub-county, complete with boarding and child rescue

centres.

1.17.6. Tertiary education

There are 12 youth polytechnics, one teachers training college, one Kenya Medical

Training College (KMTC), one university campus and three commercial colleges. The

adult literacy classes‘ enrollment stands at 2,506. As part of the wider DRR effort for

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 70

county human capital development, the county government shall support the

establishment and expansion of tertiary education institutions that will benefit the

county residents in acquiring necessary skill for participation in both the local,

national and international labour markets.

1.18. Health Access and Nutrition

1.18.1. Health facilities, personnel

The health sector in the county aims at ensuring that access to basic health service is

guaranteed to the poor. The fee waiver provision and exemption in health centres

ensures that there is equitable access to health care services by the poor. There are 184

health facilities: County hospitals (1), sub-county hospitals (4), dispensaries (156),

health hentres (19), medical clinics (2) and others (2). The doctor-to-population ratio

is 1:57,381 (Baringo Central Sub-County) and 1:34,716 (Koibatek Sub-Sounty). The

infant mortality rateis 63/1000.

The county access to health facilities is poor with most of the population having to

cover long distances, above 5km, to access health facilities. With only four major

hospitals, the available bed spaces are too limited the county‘s entire population. The

county has a low doctor and nurse patient ratios, an indicator of compromised

medicare.The county government shall mobilise resources and partner with other

development agencies to establish and expand community health units. This will

enhance grass root access and referral services to host health facilities. For

sustainability, the created partnerships shall promote income generating activities

within the health facilities to earn revenue, which will be used as stipend for their

attached Community Health Workers (CHWs) among other needs.

1.18.2. Morbidity

Malaria, respiratory tract diseases, skin diseases and pneumonia are the most

prevalent diseases although there has been a marked improvement in diseases control

through effective implementation of various programmes.

1.18.3. Nutritional status

More than one in three children (34.3 per cent) in Baringo County is stunted or too

short for their age compared to 35 per cent nationally. This is a sign of chronic

malnutrition and it is most prevalent in Baringo North and Central, which are usually

more food secure. Prevalence of acute malnutrition for children of age 6-59 months

based on the child‘s weight for height in Marigat and East Pokot sub-counties is

12.2per cent, which is poor.

Child morbidity in East Pokot and Marigat (<59 months old) shows those sick with

watery diarrhea disease is18.9 per cent, bloody diarrhea and fever is 1.7per cent and

33.3 per cent respectively. Air respiratory tract infections are also common in all the

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 71

districts with Baringo North and Central at 65.9 per cent and East Pokot and Marigat

at 42.6 per cent.Key infant feeding practices, iIncluding exclusive breastfeeding

depicts Baringo Central and Marigat at 27.6 per cent and East Pokot and Marigat at

32.1 per cent.Households that normally eat three meals a day stand at 72.1 per cent

and two meals and one meal are 21per cent and 2.6 per cent respectively.

In Baringo Central and Baringo North sub-counties, the prevalence of acute

malnutrition for children under 6-59 months of age based on MUAC shows that,

severe malnutrition (less than 115 mm) is 0.6 per cent while moderate (115-<125

mm) is 3.4 and the malnourished is 4.0 per cent. Immunisation coverage in the two

sub-counties shows average of 97.2 per cent on ages 6-59 months.

The county government shall support and also mobilise partnerships towards nutrition

interventions for children below five years, expectant and lactating mothers. Other

DRR programmes to be supported will include referral services and on-job-trainings

(OJT). The county government shall also support initiatives to ensure quality and 90

per cent coverage of high impact nutrition interventions at health facility and

community level. It shall strengthen their capacity to ensure timely and accurate

reporting of high impact nutrition interventions and improve nutrition outcomes

through integration with WASH and other interventions.

1.18.4. Immunisation coverage

Immunization coverage has improved considerably with current coverage standing at

about 80 per cent. HIV/AIDS pandemic still remains a key challenge although efforts

have been stepped up to reduce the prevalence rate. The HIV pevalence rate is at 4.2

per cent against the national average of 6.2 per cent.

1.18.5. Access to family planning services/contraceptive prevalence

The number of clients to family planning services was 5,768 by 2011. However, the

family planning acceptors were only 47 per cent of those targeted. The percentage of

mothers who were using contraceptives stood at 45 per cent compared to 70 per cent

for the entire nation. The low use of modern family planning methods can be

explained by the fact that initial introduction of family planning targeted only women,

leading to the development of negative attitude of men towards family planning. The

nomadic lifestyle of some communities in the county significantly reduces the uptake

of family planning methods.

The average number of children per family in the county is five compared to the

national figure of 4.6. Injectables and pills as a means of family planning are the

most popular, followed by IUDs and female sterilisation. Few facilities offer

family planning services, especially those that provide male condom, which is a

dual protection against pregnancy and HIV/AIDS

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 72

Chapter Two

County Development Analysis

The chapter provides the linkage of the County Development Profile with the Kenya

Vision 2030, the Medium Term Plans, MDGs and the Constitution of Kenya, 2010. It

also analyses the major development challenges and cross-cutting issues that affect the

development of the county. The chapter concludes with a highlight of the issues, their

causes, the development objectives and strategies mapped to MTEF sectors and county

functions as given in schedule four of the Constitution, 2010.

2.1. National context

This County Integrated Development Plan is a requirement of the County

Governments Act, guided by the national strategic direction articulated in the Vision

2030, which is being implemented through five-year medium term plans. Vision 2030

is Kenya‘s development blue-print covering the period 2008 to 2030. It aims at

making the country a newly industrialised middle-income economy providing high

quality life for all its citizens by the year 2030. The county will coordinate its efforts

within the framework of Vision 2030 to contribute towards achieving an average

annual growth rate of 10 per cent, equitable social development where every citizen

has equal access to opportunities as well as having a result-oriented and accountable

democratic political leadership.

In line with the above, the county will put emphasis on strategies that aim at

improving the welfare of residents of the county through expanding the economic,

social and political opportunities. These strategies will improve on the already tested

best practices to fight poverty through sectors with high potential and wider impact.

2.2. The Second Medium-Term Plan (MTP2):

The Second Medium-Term Plan (MTP2), 2013-2017, is being implemented in a setting

and context, which differs significantly from that of the first MTP. The constitution of

Kenya (2010) has created a devolved structure of government at the national and

county level and specified the distribution of functions between the two levels of

government. The County government will engage the public in policy formulation so as

to seek consensus participation of the people, good governance, integrity, transparency,

accountability and sustainable development. The Public Financial Management Act,

2012, will guide the county in preparing its County Integrated Development Plans.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 73

2.3. Millennium Development Goals (MDGs)

The County Development Profile is also linked to the eight MDGs, which aim at

improving the livelihoods of the vulnerable population. During these periods, the county

will strive to set an enabling environment for maximum contribution towards the

realisation of the MDGs:

MDG 1 - Eradicate extreme poverty and hunger. Reducing poverty from 58 per cent

to 50 per cent through the integration of various sectors in the county. This would lead to

reduction of the proportion of people whose income is less than one dollar a day. The

county also plans to achieve full and productive employment and decent work for all by

the year 2015.

MDG 2 -Achieve universal primary education: Through the free primary education,

the county will increase the literacy rate from 86.4 per cent to 95 per cent by 2015 and all

the children, boys and girls alike, will be able to complete a full course of primary

schooling. The county will also endeavour to improve transition rates from primary to

secondary education as well as to tertiary education.

MDG 3 - Promote gender equality and empower women:By eliminating gender

disparity in all levels of education. This will initiated by establishing girls‘ boarding

schools in each constituency in the county. Government women enterprise fund has

funded 316 groups in the county with a disbursement of about Sh19, 050,000 as per the

end of the year 2012. These figures are expected to rise as more groups borrow from the

kitty. The county will also implement the gender policy to ensure equitable

representation of women in development committees and in employment.

MDG 4 - Reduce child mortality:Through availability of antenatal care and

immunisation at the Kabarnet County level five hospital and sub-county hospitals in

Kabartonjo, Eldama Ravine, Marigat, Chemolingot and Mogotio, the child mortality rate

would be reduced from the current rate of 62/1000 in the county.

MDG 5 - Improve maternal health: Access to universal reproductive health for

mothers before and after birth through free distribution of mosquito nets. Antenatal and

post-natal care services have so far improved in the county. The county has a 31/1000

neonatal mortality rate and 21/1000 post-natal mortality rate. The county will gear

towards halving this figure by 2015.

MDG 6 - Combat HIV and AIDS, malaria and other diseases: Malaria, bronchitis

and pneumonia remain the most prevalent diseases. There has been a marked

improvement in disease control through effective implementation of health programmes

such as distribution of mosquito nets and free anti-malaria drugs. Trachoma is another

emerging disease common within pastoral communities. Immunisation coverage is

currently approximated at 80 per cent. HIV/AIDS pandemic still remains a key challenge

although efforts have been stepped up to reduce the prevalence rate, which stands at 4.6

per cent (2011).

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 74

MDG 7: Ensure environmental sustainability. Over 90 per cent of Baringo County is

Semi-arid and environmental resources play a critical role in supporting livelihoods and

reducing poverty. Charcoal burning, overgrazing, solid waste and destruction of water

catchment areas and wetlands are key environmental problems facing the county. The

main mitigations for environmental degradation are: Improved environmental education,

strong enforcement of legislations, community participation as well as strong institutions

at local level in the county.

MDG 8: Develop a global partnership for development. The county adopts an open,

rule-based, non-discriminatory trading from the entrepreneurs from outside the county.

In cooperation with the private sector, development partners and NGOs, the county

government shall provide access to essential goods and services such as water and

training.

2.4. Constitution of Kenya, 2010

The Constitution of Kenya, 2010, has introduced fundamental changes in the

management of public resources as well as a devolved system of governance consisting

of the National and County Governments. This entails devolving power and resources to

the county level. In this regard, the County Development Profile will provide the basic

socio-economic and infrastructural information on which the county governments will

base its development plans and budgeting. The constitution also requires that

development planning and budgeting must be all inclusive – involve all stakeholders in

the county.

2.5. Vision 2030 flagship projects affecting Baringo County

Vision 2030 is the national blueprint for development in Kenya. It is implemented

through an array of policies and programmes as well as flagship projects that are expected

to embody the transformation anticipated by Vision 2030. Several flagship projects are

expected to be implemented in Kenya, including the following:

i. Chemususu Dam: This is one of the two large dams that are anticipated under the

water sector. Construction of the dam is complete, although the distribution is still

ongoing.

ii. LAPPSET Southern Corridor: Under transport infrastructure, the government

intends to construct a standard gauge railway line from Mombasa to Malaba. The

section of the network passing through Baringo on the southern corridor has already

been constructed.

Baringo is also uniquely placed considering that 100km of the northern corridor under

the LAPPSET project is also expected to pass through the northern Baringo – making

this the only county traversed by both corridors.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 75

iii. Kenya School of Government: Under Vision 2030, the Kenya School of

Governmenthas been established and is expected to transform the public sector. This

institution has campuses in Mombasa, Embu, Nairobi and Kabarnet, which is the

headquarters of Baringo County.

iv. Least cost power development plan: The least cost power development plan has

identified geothermal energy as the least cost source of power. The Geothermal

Development Corporation (GDC) has been establishedfor the further development of

this resource, which is abundant in Baringo County at Arus, Kapsoi, Lake Bogoria,

Silale and Korosi. Active petroleum exploration at blocks 12A and 10BB are also

ongoing within Baringo.

v. Establishment of a livestock disease free zone: Vision 2030 also intends to establish

a disease free zone, of which some parts of Baringo adjacent to Laikipia are included.

vi. Value addition through economic stimulus programme: Several projects have

been implemented under this programme, including Maoi slaughterhouse, Mogotio

Tannery and Kapkuikui honey refinery.

2.6. Regional context

Baringo is positioned at the intersection of the Western Region, the South Rift and

NorthernKenya and serves as the gateway to these regions. It is also the host of the

North Rift tourist information and operations centre.

Baringo is also the focus of various security operations associated with the arid

northern frontier involving Laikipia, Samburu, Turkana, West Pokot and Elgeyo

Marakwet. Baringo is important for peace keeping and cohesion initiatives, drought

management, disaster preparedness and climate change resilience building within the

region.

1. The Kerio Valley Development Authority (KVDA) is a regional development

organisation that coordinates development programmes in Kerio Valley.

2. Baringo occupies the northern flank of the Mau complex and most of its head waters

emanate from this tower. The Chemosusu water project is expected to provide an

inter-basin water transfer to some residents in Nakuru.

3. Kerio River forms the western border of Baringo, locally known as Turukwei basin.

This is an important water source for all the counties that depend on it, including

Turkana, West Pokot and Elgeyo Marakwet. There is a need to coordinate

conservation efforts among the affected counties.

2.7. Comparative advantages of Baringo County

These include natural resouces like distinctive geography, biodiversity,geothermal

energy endowment,water-hydro and irrigation and land.human capital like

talent,institutions,value system.economic advantage like location,population and market

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 76

size,stradding northern and southern corridors and economic activities (livestock

production)

2.8. Major development challenges

Being an ASAL area, majority of the population in the county is pastoralist, although

there are few small-scale farmers. The major challenges to development in the county

are: Poor infrastructure, limited water resources, environmental degradation, poor

marketing system and limited access to financial credit services. In addition, weak

institutional systems, poor information and communication technology,

unemployment, insecurity, retrogressive cultural practices and land tenure system are

also challenges that affect the county. The challenges are elaborated in more detail

below.

2.8.1. Poor infrastructure

The existing road network is inadequate and as a result, institutions like schools,

health facilities, designated trading centres and areas with high potential for

production of raw materials for industries are not well served. There are only 289 km

paved roads in the entire county, which is not sufficient. The highland regions of the

county like Mumberes, Eldama Ravine, Sirwa, Sacho, Tenges, Kabarnet and Torongo

have high potential for the production of maize, beans, milk, pyrethrum, horticultural

produce and mutton but the road network is poor due to the steep terrain. These areas

become impassable during the rainy season hence hindering the transportation of

goods and services to the markets.

In the lowland areas of Mogotio, East Pokot and Marigat, there are very few classified

roads. These areas have high potential in the production of livestock and livestock

products but due to transportation problems, there is limited exploitation of industrial

raw materials such as hides and skins as well as meat processing.

Resources towards construction of tarmac roads in the county and opening of new

roads should be increased so as to ease transportation problems. In addition, dormant

airstrips in the county will need to be rehabilitated for use in tourism and other

activities aimed at fostering development.

2.8.2. Limited water resources

Water-related challenges in the county are not limited to water supply and sanitation

services.

Scarcity: Baringo County is classified among the most water scarce counties in the

country. The county is also plagued by chronic cycles of flooding and drought that are

increasing in frequency and severity.

The situation is exacerbated by negative effects of climate change, as well as high

population growth, significant upland watershed destruction and non-equitable

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 77

distribution of water resources. The government has recently taken steps to protect

upland watersheds.

The most affected are the arid and semi-arid areas especially Marigat, East Pokot,

Mogotio and Baringo North sub-counties, which experience frequent shortages of

water for human and livestock consumption. This is caused by the low rainfall

received and prolonged cyclic droughts. This has hindered development of livestock

and farming activities and a lot of time is wasted looking for water instead of citizens

being engaged in productive activities.

Water from Lake Bogoria and Lake Baringo has not been exploited for domestic and

irrigation purposes due to its high salinity. This also affects the ground water in the

surrounding areas.

Because of the unique terrain in Baringo County and the pattern of settlement in

highland areas, which often are upstream of the reliable perennial sources of water,

the water supply schemes struggle with high energy costs for pumping water. The

lack of distribution systems is also a major challenge in the county.

2.8.3. Environmental degradation

Environmental degradation in the county is caused by overgrazing, indiscriminate

cutting of trees for fuel, non-protection of water catchment areas and poor farming

practices. The topography of the county accelerates soil erosion, as it is hilly in most

places. When it rains, most of the soils are swept into Lake Baringo which

exacerbates the problem of silting in the water storage facilities and the dams.

Most farmers seem to be unaware of the importance of environmental conservation,

and hardly take conservation measures seriously. Some of the land is not adjudicated

and this encourages shifting cultivation, with serious consequences on the

environment. Environmental pollution could also become a problem if not checked.

Measures will be taken to sensitise farmers and other residents on the importance of

conserving the environment.

2.8.4. Poor marketing system and limited access to financial credit services

Market outlets for crops, livestock and livestock products in the county are not well

established. For cash crops, poor marketing is occasioned by the weak cooperative

societies in the county. Lack of ready markets and market information for output,

inadequate storage facilities and transportation problems all work against the

development of agricultural, livestock and industrial sectors. On livestock production,

marketing is hampered by inadequate auction and holding grounds, especially in areas

where livestock farming is a major economic activity.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 78

Marketing of milk is hampered by inadequate collection centres and milk coolers as

well as poor roads. There are only a few financial lending institutions in the county,

with Mogotio, East Pokot and Baringo North sub-counties without commercial banks.

Lack of organised markets, poor marketing skills and poor transport system has

hindered business growth in the county.

2.8.5. Weak institutional systems

The performance of most organizations, especially government departments is

affected by inadequate funds, allocations not based on work plans, insufficient

working facilities like vehicles, weak information systems and inadequate staff.

Monitoring and evaluation activities are not well facilitated in the county, which

hinders proper tracking and impact assessment of projects and programmes.There is

need for fast-tracking of the rollout of the National Integrated Monitoring and

Evaluation System (NIMES) to facilitate this process.

Projects and programmes, especially those under the public sector are affected by the

lengthy procurement procedures as well as delays in release of funds. This leads to

escalation of costs, delays in completion and sometimes accumulation of pending

bills, which discourage contractors.

2.8.6. Information and communication technology

The information and communication technology penetration in the county is quite low

at approximately 45 per cent. As at 2012, the county was yet to be connected to the

national communication fibre-optic cable spearheaded by the directorate of e-

government.

The mobile phone coverage in the county is low. Most schools and institutions are not

covered by any service providers in terms of mobile telephony or internet services.

2.8.7. Unemployment

There is a high level of unemployment in the county, especially among the youth.

There is, therefore, need for sustained efforts to create employment opportunities. The

Vision 2030 has employment creation at the core of the social pillar, especially in

relation to poverty reduction. Efforts are being made to create jobs by attracting

investors particularly in horticultural farming and eco-tourism.

2.8.8. Insecurity

Insecurity is another major impediment to development. The county is prone to

frequent cattle rustling between communities within the county and also with those

from neighbouring counties of Samburu and Turkana. This is caused by cultural and

economic factors. Community conflicts over pasture and watering points are also

common during dry periods. Insecurity has completely paralysed farming activities in

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 79

the affected areas. In addition, most of upcoming market centres and schools located

around the areas prone to attacks do not develop due to desertion.

The major intervention to address insecurity will be strengthening of community

peace committees to conduct peace building initiatives and conflict resolution both

within the county and across the borders. Other measures will include strengthening

community policing, providing additional police reservists, improving the capacity of

anti-stock theft, setting up more police posts and improving communication

infrastructure for rapid response by the security agencies.

2.8.9. Retrogressive cultural practices

These practices include, Female Genital Mutilation (FGM), early marriages,

moranism and cattle rustling. FGM is practiced by some communities and there has

been resistance to change despite concerted efforts by government and other

development partners. Girls undergoing FGM are in most cases married off early thus

denying them an opportunity to attend school.

Moranism is practiced by some communities in Baringo. Under this practice, young

boys are taken for training for some period of time in keeping with the tradition. This

denies them time to attend formal education. Cattle rustling activities are normally

executed by morans thereby linking it to insecurity.

2.8.10. Land tenure system

Land ownership tends to be communal, particularly in the semi-arid parts of the

county. This means that most families do not have title deeds to the land they occupy,

which further means that development of the land is hampered. For example, farmers

with no title deeds cannot use land as collateral to secure loans from financial

institutions. Efforts will be put in place to ensure adjudication of the land so as to

issue title deeds to the owners

2.9. Cross cutting issues

This section represents the cross-cutting issues that might affect development of

county and how to address them. A SWOT analysis has also been done for each of the

cross-cutting issues.

2.9.1. Poverty

The main causes of poverty in the county include inadequate and unreliable rainfall

leading to crop failure and drought, especially in the lowlands of the county; lack of

employment opportunities; inadequate extension services; low prices or lack of

organised markets for agricultural produce; high cost of agricultural inputs; poor

infrastructure, especially the road network due to poor terrain; low transition rates in

both primary and secondary schools, inaccessibility to credit facilities by farmers for

investments in agriculture and low yields from livestock and livestock produce.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 80

There is need to put in place strategies necessary to reduce poverty in the county,

which include: Water harvesting and the development of irrigation projects, improved

access to credit facilities, improvement in the road network, value addition to farm

produce, use of AI services and reduction in cost of farm inputs.

The effect of poverty on agriculture and livestock production is very significant as

farmers are unable to purchase inputs for crops and livestock production. This has

contributed to low productivity, late land cultivation and loss of produce due to poor

crop husbandry, animal disease control and persistence drought. The county has

experienced increased poverty levels over the years. The 2009 Welfare Monitoring

Survey (WMS) estimated that 35 per cent of the population in the county lived below

the food poverty line. The people in the county most affected by poverty are the

pastoralists, small scale farmers, female headed households, people with disabilities,

the landless and children-headed household.

Table 17: SWOT Analysis of Baringo with respect to poverty

Strengths

Ongoing programmes towards addressing poverty

Existence of micro-finance Institutions

Operational youth and women funds

Existence of youth training institutions

Existence and operational poverty eradication fund

Availability of large tracks of land

Existence of some well developed human resources

Weaknesses

High poverty levels

Inadequate resources

Lack of implementation of strategies to address poverty

High illiteracy levels

Limited entrepreneurial skills

Low savings and borrowing culture

Limited employment opportunities

Conflicting land use patterns. Poor infrastructure e.g.

road, electricity and water and poor access to credit

facilities

Opportunities

Donor support through interventions in water and

food security

Guarantees in the Bill of Rights in the Constitution

Ongoing training on entrepreneurship skills in the

existing institutions/colleges

Establishment of cottage industries for processing of

livestock and agricultural products

Threats

Frequent drought

Environmental degradation

Climatic shocks affecting agricultural production

High population growth

HIV and AIDS pandemic

Globalisation and influx of cheap goods that threaten

local industries

2.9.2. Gender Inequality

Majority of the illiterate in the county is the adult population, especially women. This means

the quality of their participation in development activities is lower than that of men. In order

to reverse this trend and create balance in participation of men and women in the

development of the county, emphasis will be put on the education of the girl child. At the

same time, functional adult literacy activities will be stepped up in order to improve the

literacy of women who are the majority in the adult classes. The participation of women in

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 81

the cooperative sector in the county is still poor. In order to increase their

participation,cooperative societies should encourage including certain percentage for women

in the management positions.

At the same time, social services will continue to register women organisations and

encourage them to gain access to credit facilities that can enable them under take activities

that help to reduce poverty.

The county recognises the importance of active participation of women in water development

activities. The water department alongside other water bodies has endeavored to involve

women in the implementation, management, operation, and maintenance of water projects.

In order to create a gender balance in the participation of men and women in business

management, micro-finance institutions will be encouraged to focus attention on training

women on basic business skills and providing them with credit facilities in order to improve

their businesses, which will boost the income levels of widows and female headed

households.

The cultural and traditional practices and barriers have contributed significantly to gender

imbalances in the county. These include gender inequality in ownership of land and livestock,

and control over the use of income, especially in the non-working class of women.

All the stakeholders in the development process will work together to ensure gender

mainstreaming in major projects and programmes as well as addressing gender disparities in

access to education.

The stakeholders in the county will address gender disparity issues by implementing the

national government policy on 30 per cent representation of women in major decision making

organs.

Table 18: SWOT Analysis of Baringo regarding gender inequality

Strengths

Women‘s immense contribution to development,

especially in agricultural sector

Incorporation in development committees

Existence of various women groups

Mainstreaming of women issues in development

activities

Legal frameworks in place to supports equality

Weaknesses

Deep seated cultural values that discriminate against

women;

Unwillingness by women leaders to take lead on

women affairs

Skewed participation in project management

committees

Few active women groups on entrepreneurial activities

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 82

Opportunities

Girls-specific learning institutions coming up

Women development fund

Increased access to financial services

Opportunities as a result of affirmative action

Government 30 per cent policy on women

employment, participation in decision making

The existence of the gender department and several

NGOs dealing with gender issues

Threats

Pastoralists movement across the county, hindering

implementation of women agenda

Poor enforcement of the affirmative action and

constitutional requirement

Retrogressive cultural practices strongly bound to

communities beliefs

Collapse of enterprises

Drug and substance abuse and HIV/AIDS

2.9.3. High population growth rate

The county population projection is based on a growth rate of 2.9 per cent per year. This

rapid population growth will continue to have negative effects in all sectors of development if

not checked. For example, there will be increased demand for infrastructural service such as

telephone and electricity, the demand for clean water will increase and proper sanitation may

continue to worsen. High population growth has also worsened the unemployment problem

as well as encroachment of water catchment areas. There is also pressure on land since it is

static among the variables as the population increases.

This calls for the implementation of the population policy in order to reduce the growth rate

as well as the number of children per woman. Family planning will be promoted through

provision of contraceptives.

Table 19: SWOT analysis of Baringo with respect to population growth

Strength

Family and reproductive health programmes

Willingness of women to adopt new family

planning methods

Availability of affordable contraceptives

Weaknesses

High fertility levels

Unwillingness of men to participate in family

planning services

Opportunities

New policy on population

Good will of the donor community and government

to finance family planning services

Threats

Unfavourable cultural practices that impede family

planning campaigns

High levels of poverty

Pastoralist lifestyle, which makes difficult to reach

all the target groups for sensitisation

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 83

2.9.4. Disaster management

Drought conditions occur frequently in the county causing livestock deaths and loss of farm

produce. This is due to low rainfall pattern. Other major disasters include, floods, natural

resource-based conflicts, animal disease outbreaks, plant diseases in irrigated lands, cattle

rustling, boundary disputes/land disputes, land slides and deforestation. Baringo is also

affected by slow onset disasters such as HIV and AIDS.

To combat the effects of drought, more resources are to be diverted to save lives of both

humans and livestock through the provision of water, relief food, disease control, provision of

human health services and food supplements. A long-term solution to curb this problem is to

improve irrigation in the dry areas. A classical example is the Perkerra irrigation scheme,

which has resulted in improved yields of the farmers in the area, especially production of

horticultural products.

The tourism sector is also affected by drought because this is when a lot of wildlife migration

in search of food and water takes place. At the same time, human-wildlife conflicts and

poaching incidences increase drastically due to competition for water at the few perennial

water sources.

Government offices, including local authorities, are at risk of being gutted by fire because

they lack essential firefighting equipment. In order to avert or minimise occurrence of such

disaster, efforts will be made by the county to capacitate both the government offices and the

public on measures of minimising, handling and controlling disasters.

Table 20: SWOT Analysis of Disaster Management

Strengths

Existence of government departments

and NDMA act

Existence of disaster management

committees

Availability of information channels

such as FM radios and libraries

Availability of assessment reports

Past experiences in disasters and

available training facilities

Sufficient security agencies

Existence of NDMA and DSGs

Closely knit societies and willing

volunteers

Weaknesses

Implementation gap

Lack of capacity on DRR, language barrier

Lack of skills capacity and financial resources

Lack of capacity to integrate DDR, finance, lack of clear policy on

DRR mainstreaming in all sectors

Lack of dissemination of information

Low adoption of technology

Rigidity of the populace

Low literacy levels, cultural beliefs, lack of skilled personnel on

DRR

Communication barrier, nomadic way of life, ignorance and poor

telecommunication infrastructure

Overreliance on donations, poor agricultural practices and

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 84

dependence on livestock

Corruption

Poor coordination, lack of equipment and resources

Opportunities

Funding from NGOs, present clear

legislation

Willing workforce, training opportunities

Use of available manpower Government

staff, military, police etc)

Opportunity to have policy on DRR,

sectoral policies, training of staff.

Local FM, available stakeholders

KNBS , ICT e.g. common data centres

Technology, administrative structures

Good will from donors, available

manpower

Active CBOs, NGOs, FBOs, good will

from donors

Availability of global funding

Threats

Duplication of activities, lack of awareness of populace

Transfers, conflicts, Insufficient funds for training

Corruption, transfers, Expansive area

incompetent of staff, corruption, stakeholders perception

Cultural attachment

Hacking, vandalism, computer virus

Conflict‘; cultural beliefs

Lack of funding, lack of political or stakeholder will, nomadism

Cultural beliefs, mismanagement of funds, lack of co-ordination

Cultural belief, bureaucracy in goverment

Unpredictable climatic conditions, communal land tenure system ,

refugees

Unpredictable climatic conditions

Terrorism

Encroachment, terrorism

Unpredictable climate

Expansive

Corruption, lack of contingency funds

Duplication of efforts

Reactionary culture of stakeholdersv(government and NGOs

Poverty

2.9.5. Environmental and climate change

Environmental degradation is widespread in most parts of the county. Some areas are lined

up with deep gullies and without any vegetation cover, rendering these areas unfit for

development activities and thus reducing the county‘s production potential. Settlement in

fragile ecosystems also affect these areas adversely in the long run, thus reducing agriculture

and livestock output and consequently household incomes. The incidence of human-wildlife

conflict has also increased as well as interference in wildlife migratory routes.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 85

Use of plastic packing has resulted into major heaps of plastic scattered all over the towns or

urban areas, posing a major environmental hazard in the county.

Oil pollution from garages and petrol stations is another environmental challenge. Polution as

a result of burning sawdust and waste timber is another challenge. None of the urban centres

has a sewerage treatment system or formal garbage disposal site.

Effects of climate change include warming, frequent drought, effects on pastoralists and on

bee keeping – destruction of bees, which affects pollination.

Table 21: SWOT Analysis of Environment and Climate change

Strengths

Skills in environmental conservation

Presence of technical officers

Existence of environmental policies and legislation

Existence and operationalisation of the EMCA at the

devolved level

Strong and well trained human resource on

environmental impact assessment and audit in the

private sector

Weaknesses

Non-enforcement of laws and policies put in place

to protect the environment

Lack of adequate resources

Inadequate measures to address climate change

Weak environmental policies

Low staffing at the county levels

Weak governance system on matters related to the

environment

Opportunities

Government and donor support on environmental

issues

Educated generation that understands issues of

environment better

Threats

Global warming, destruction of forests

High poverty levels in the county

Conflicting legislation addressing environment

issues

Frequent droughts

2.9.6. County diversity – Minority groups and regional balance

The county is predominantly occupied by the Tugen while the Pokot occupy a small area.

There are, however, minorities like the Endorois, Turkana,Kikuyu, Nubians and Ilchamus

living around Lake Baringo. This poses a danger of excluding the minorities in decision

making in the county as the majority are likely to always have their say. Incidences of clashes

over pasture, water and cultural practices that do not promote county cohesion are frequent.

Cross sub-county projects have been encouraged such as Tororolokwonin Primary Boarding

School in Baringo North Sub County. Itis funded by Ministry of State for the Development of

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 86

Northern Kenya and other Arid Lands. Peace building by both the Government agencies and

CBOs is ongoing in the county.

Table 22: SWOT Analysis of county diversity - Minority groups and regional balance

Strengths

Common source of livelihood

Enactment of the constitution addresses the rights of the

minorities

CBOs and NGOs addressing minority issues

Abundant resources i.e. L. Baringo and L. Bogoria

Weaknesses

Common clashes over resources

Democratic processes that confirm the

majority‘s say

Weak network among the CBOs

Opportunities

Common investment to enhance their livelihood

Affirmative action to support minorities

Capacity building opportunity among CBOs

Resources if well harnessed can be shared

Constitutional order

Threats

Overflow of conflict to other counties

Non-commitment in act implementation

Non-vetting of CBOs

2.9.7. Youth

The youth form over 50 per cent of the total population of the county. This group is faced

with a higher risk of contracting HIV/AIDS due to peer pressure, negative attitude to upright

morals, high levels of unemployment and drug abuse. Other factors affecting them include

lack of entrepreneur skills, unplanned pregnancies and early initiation to commercial sex as a

source of living in the urban and trading centres.

The Constituency Youth Enterprise Fund and revamping of the youth polytechnics and rural

resources centres has enhanced their participation in the development process. However, lack

of entrepreneur skills and business culture remains a challenge.

Table 23: SWOT Analysis of Youth

Strength

The existence of vibrant youth organisations

Existence of specific departments dealing with youth

affairs

Existence of national youth council leaders

Numerical strength of the youth

Dynamism and creative energy of the youth who are

Weaknesses

Inadequate personnel at the youth department to

facilitate service delivery

Lack of full involvement of youth in leadership

at the grass root level

Poor institutional/legal policy framework on

youth affairs

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 87

likely to support strategies for youth development Inadequate resources, (infrastructure, budget

allocation)

Limited publicity and information on activities

of the youth department

Opportunities

Institutions created by Constitution of Kenya, 2010

Partnership with private sector to promote internship

programme

Tapping the expertise of young Kenyans in Diaspora

General goodwill from the political class on youth

development

Exploiting ICT technology

Threats

Political interference in youth programmes

Negative perceptions about the youth by sections

of the society

High unemployment, HIV/AIDS and drug abuse

Negative influence due to globalisation and influx

of foreign culture

2.9.8. Persons with Disabilities (PWDs

Although disability is not inability, most people with disability in the county are

discriminated against in terms of access to income earning opportunities. The data of people

with disabilities is as follows: Visual impairment - 4,392, hearing – 3,291, speech – 1,354

and physical/selfcare - 5,475, mental - 1523 and other forms of disability - 1085. There is

need for affirmative action on issues of the persons with disabilities. The use of national fund

for the disabled should be streamlined so that it can benefit the PWDs to establish income

generating enterprises.

The constitution gives the PWDs the opportunity to fully participate in development hence an

opportunity to articulate their issues. The national government has also formulated disability

policies and strategies. Therefore, the county will ensure there is compliance with the

national policy. The community needs to also be sensitised to eliminate stigmatisation and to

support the group.

Table 24: SWOT Analysis

Strengths

Existence of strong organisations

dealing with the physically challenged

Constitutional provisions that cater for

the needs of the physically challenged

persons

Weaknesses

Limited resources and trained personnel to address the needs of

people with disabilities

Slow implementation of the constitutional provisions and

ignorance of the acts by the citizens.

Non-compliance to disability facilities in most buildings

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 88

Opportunities

Inclusion in development activities

Government determination to

implement the constitution to the letter.

Constitutional order

Threats

Stigmatisation and discrimination;

Dinial among PWD

Slow implementation of policies and strategies by institutions

2.9.9. HIV and AIDS

HIV and AIDS is a national disaster in the country and Baringo County is no exception. The

disease has had a major socio-economic impact in the county. The county prevalence is at 4.3

per cent compared to the national level of 6.4 per cent. Most of the households in the county

have either been infected or affected by the disaster.

The impact of the scourge has been wide-ranging and includes an increase in dependency

levels, especially vulnerable children (OVCs), rising levels of poverty and food insecurity,

reduction in savings and investments in the economy due to increased expenditure on medical

care, high mortality rates across key sectors, loss in productivity of human capital and social

stigma towards the infected.

The effort to deal with HIV and AIDS in this county will focus on how to manage the

pandemic given that there is no cure; how to contain the spread of HIV, especially among the

youth and how to address the HIVand AIDS stigma. Discouraging multiple sexual partners

(as in polygamy and prostitution),managingthe problem of widows, widowers and orphans

and providing for the affected and the infected as well as ensuring access to antiretroviral

drugs.

The increasing number of OVCs in the county, currently estimated at over 14,000, is a big

challenge.They are in need of special care, including provision of food, housing and medical

care. In addition to the above, there is still the problem of stigmatisation of PLWAS, which

prevents many people from going for voluntary counseling and testing.

To deal with the problem of HIV and AIDS, several initiatives have been put in place,

including prevention of mother to child transmission, provision of antiretroviral drugs,

establishment of functional VCT centres, treatment of STI and STDS, blood safety and

condom distribution among others. There are also community awareness programmes aimed

at de-stigmatisation of PLWAS and behaviour change communication.

Table 25: SWOT Analysis

Strengths

Presence of organised groups to fight the scourge

Community awareness of the effects of the disease

Trained personnel on management of HIV and AIDS

Weaknesses

Harmful cultural practices

The nomadic way of life

Limited resources and personnel

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 89

Operational VCT centres

Many actors involved in HIV and AIDS programme

HIV and AIDS funds availability

Poor targeting by donor agencies

Poor collaboration, especially on resources

application by various organisations

Opportunities

The political good will to fight the disease

Mainstreaming of HIV and AIDS initiatives at all levels

of development

Support from donors and government to community

initiatives

Threats

Lack of the cure of the disease

Cattle rustling displacing the sick

Land ownership issues

Denial and stigma

High poverty levels among the youth thus

engaging in risky behaviour

New strains of HIV

2.9.10. Information communication technology

The county has not fully benefitted from Information Communication Technology (ICT) as

the requisite infrastructure has not been put in place. Majority of the county‘s residents have

not embraced ICT apart from youth closer to urban centres and frequently use cyber cafes.

There is also lack of electricity mostly in rural areas. This has aggravated further the issue of

digital divide between the urban and rural population in the county. However, the increasing

mobile phone penetration has ameliorated the problem because some can access internet

through their mobile phones. Most public offices, learning institutions and health facilities in

the county are yet to be fully connected and, therefore, there is need to ensure that the fibre-

optic cabling reaches the county and all sub-county headquarters. In addition, there are public

information and documentation libraries/centres where the residents can access publications.

Table 26: SWOT analysis:

Strength

Existence of cyber cafes in urban centres

Advanced technology - the mobile telephony

network and fibre optic cable

Penetration of the mobile telephone services

Weaknesses

Poor distribution of electricity, especially in rural

centres

Poor connectivity to the existing cyber cafes

Slow rate of adoption of new technology

Opportunities

Ongoing fibre optic cabling

The ICT-enabled services that enable the youth to

engage in outsourcing services

Threats

Interruption of telephone system and power due to

vandalism/power outage

Negligence to affordable and local available

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 90

Services being provided by the directorate of e-

government and other agencies

technology

The digital divide between the urban and rural areas

Globalisation and influence of foreign culture

2.10. Analysis of issues and causes – Potential strategic policy thrusts

The table below presents a summary of the main development issues and problems affecting

the county, their causes, development objectives and proposed strategies. It also maps the

development issues with the respective MTEF sectors and corresponding county functions.

2.10.1. Agriculture and rural development sector

Institutional Setup:

The national government is in charge of agricultural and veterinary policy while the county

government is in charge of crop and animal husbandry,livestock sale yards, county abattoirs,

plant and animal disease control and fisheries. The National government is expected to

develop a land use master plan

Table 27: Policy thrusts for Agriculture and Rural Development

Problems and their Causes Development objectives Policy Thrusts

Food insecurity

Caused by

Erratic rainfall, low and declining

soil fertility, inadequate farm skills,

high cost of farm inputs,

environmental degradation and

continuous cropping.

To reduce by half the population

suffering from hunger by 2015

To improve Soil fertility and reduce

soil erosion

To reduce dependency on rain fed

agriculture

Promotion of drought tolerant crops,

Promotion of water harvesting

Promotion of sustainable agriculture

and agro forestry

Development of Irrigation Projects

Poor trade and low market value for

agricultural produce

Caused By

Lack of organised marketing groups

Lack of knowledge on value

addition techniques

Promote farmer marketing groups

Initiate market linkages for

agricultural products

Initiate value chain addition for

agricultural crop produce and

provide training to farmers on value

addition

Improve access roads, Construction

of new market stalls

Establish organised marketing

groups for farmers to undertake

produce marketing

Low uptake and adoption of

technology and Low use of farm

inputs

Caused By

Limited budgetary allocation and

few front line extension staff

Lack of funds to purchase of farm

inputs,

Lack of stockists in some areas of

the county.

Inadequate extension service

providers

High poverty levels

Encourage and promote private

extension service provision

Provision of credit facilities and

grants to farmer groups

Increased extension coverage

Group approach extension Increase

farmers‘ access to credit

Encourage investment of agro-input

stores in the county

Encourage bulk input procurement

by farmers‘ groups

Initiate market linkages for

agricultural input and improve

access to the agro-inputs

Encourage farmers to take credit

facilities from banks, SACCOs

Initiate table banking among the

farmer groups

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 91

Problems and their Causes Development objectives Policy Thrusts

Encourage farmers‘ to join groups

and societies to procure inputs in

bulk

Initiate agro-input enterprise

training programme for stockiest

Undeveloped Information

management system (IMS)

Caused By

Lack of equipment and information

sourcing.

To improve agricultural productivity

To develop an IMS policy to guide

the adoption of appropriate

technology by 2017

Develop an affective agriculture

information system to improve

agriculture production, processing

and trade

Review policies on agricultural IMS

with reference to information

sourcing, storage, disbursement and

use.

Improve link between research-

extension and farmer for better

technologydevelopment, transfer

and adoption.

2.10.2. Health Sector

Institutional Setup

National government will devolve funds and management of health care to the

communitiesThe national government to deal with policy and research issuesShifting the bias

of the national health bill from curative to preventive care. The county government health

services include county health facilities and pharmacies, ambulance services, promotion of

primary health care, licensing and control of undertakings that sell food to the public,

veterinary services (excluding regulation of the profession),waste disposal and cemeteries

Table 28: Policy Thrusts for the Health Sector

Problems and their

Causes

Development objectives

Policy Thrusts

Poor health care

Lack of funds

Old/worn-out

structures

Caused By

Inadequate staff

Poor road network

Inadequate essential

drugs

To improve health standards in the county

Ensure that facilities have adequate staff

To curb the spread of the most common

diseases in the county

Ensure the continuous supply of most

essential drugs

Request for more staff from ministry

headquarters

Increase malaria/TB campaigns

Promote nutrition and balanced diet

care

Increase prevention and disease

control

Promote immunisation campaigns

Equip health facilities

Inadequate health

facilities

Caused By,Lack of

funds Old/worn-out

structures

Complete refurbishment and four wards

in Baringo County Hospital

Building of 72-bed inpatient wing at

Marigat Sub-County Hospital.

Solicit for development funding from

GOK, CDF and any other donors

Continuous maintenance of buildings

and stations.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 92

2.10.3. Environmental Protection, Water and Housing Sector

Institutional Setup

The National Government will expand and rehabilitate irrigation schemes i.e. Perkera and

Kerio ValleyThe water catchment Management Initiative, Securing the Wildlife Corridors

and Migratory Route Initiative, Solid Waste Management System Initiative, Plastic Bags

Initiative, Land cover and Land Use Initiative, Housing Development Initiative and

Enactment of the Housing Bill 2006.

The county will control air pollution, noisepollution, other public nuisances and outdoor

advertising. It will also ensure environmental conservation, soil and water conservation,

forestry,firefighting services and disaster management, storm water management systems and

water and sanitation

Table 29: Policy thrusts for Environment, Water, Land and Housing

Problems and their Causes Development

objectives Policy Thrusts

Environmental degradation

Deforestation and Soil erosion

Caused By

High levels of deforestation

Poor quarrying techniques

Poor farming methods

High number of animals

Poor solid waste disposal

Low investments in housing sector

To Ensure that our

environment is well

conserved

To ensure environment

issues are mainstreamed

in planning

Environmental management and Conservation

Increase reforestation

Protection of water catchments

Proper waste disposal.

Water scarcity

Caused By

To ensure sufficient

access to clean and

portable water

Undertake forestation and re-aforestation

Construct more boreholes, construct more

Poor curative

services

To acquire medical equipments e.g. X-ray

facilities, ultrasound, delivery beds,

delivery sets and hand microscopes

(light).

Supply of 20 delivery beds to 20 rural

health facilities

Supply of 5 delivery sets to every health

facility in the County

Supply of 20 light microscopes to the

county

Commit substantial funds to install

new X-ray machines at Kabartonjo

H/C, Tenges H/C, Mochongoi H/C,

Supply and installation of an ultra-

sound machine at Baringo County

Hospital.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 93

Inadequate rains

Inadequate water points

Poor water harvesting methods

dams, construct more roof catchment

And rehabilitate existing water supplies

Initiate riverbank protection along Kerio

Valley

Promote river dam construction

Initiate roof catchments programme

Initiate clean water projects

Poor Waste Management Initiate proper waste disposal and sanitation in

upcoming towns.

2.10.4. Public Administration and International Relations Sector (PAIR)

The national government to provide security to citizens and their property, The county

government shall ensure and coordinate the participation of communities in governance at the

local level and assisting communities to develop the administrative capacity for the effective

exercise of the functions and powers and participation in governance at the local level

Table 30: Policy thrusts for Public Administrtaion and International Relations

2.10.5. Social Protection, Culture and Recreation

The national government to provide consolidated social protection fundThe county

government will be in charge of cultural activities, public entertainment and public amenities,

including betting, casinos and other forms of gambling racing, liquor licensing, cinemas,

video shows, libraries, museum, sports and cultural activities and facilities and county parks,

beaches and recreational facilities.

Table 31: Policy thrusts for Social Protection and Culture

Problems and their Causes Development objectives Policy Thrusts

Increase in the number of

OVCcaused by HIV and AIDS

prevalence;

High levels of poverty

Nomadic way of life.

To Ensure proper care of OVC

To Improve the situation of OVC

Ensure proper care and

protection;

Ensure that OVC get access to

education, health care and birth

certificates

Introduce the OVCs cash

transfer (OVC-CT) to families

taking care of OVC

Work towards poverty reduction

with development partners

Increase of awareness to the

general public on the rights of the

child

Problems and their

Causes

Development objectives

Policy Thrusts

Insecurity Inadequate

security officers

Conflict over resources

Cattle rustling

Poor road network

Reduction in the cases of cattle rustling in

the sub- county

Ensure security

Improve security by deployment of security

agents

Improve road network

Community policing

Collaboration with communities to

open access roads

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 94

Problems and their Causes Development objectives Policy Thrusts

Closely monitor the OVC-CTs

expenditure

Iincrease awareness among

parents, youth and the general

public

Responsible parenthood

High povertyHigh levels of

unemployment;

Low agricultural production;

Low livestock production;

Low value addition;

Persistence drought;

Lack of markets for both

livestock and agricultural

produce.

Lack of diversification in

business;

Low technology and innovation;

Low levels of networking;

Poor infrastructure

Increases HIV and AIDS

dependency

Improve the standard of living of

the community;

Ensure high levels of income.

Ensure youth access youth fund.

Increase agricultural products;

Increase livestock produce;

Provide water for irrigation;

Improve infrastructure especially

road network

Mobilize youth and capacity

build them on use of loans;

Use of modern farming methods;

Promote hybrid crosses;

Promote irrigation schemes;

Promote agro industries;

Build micro-industries for value

addition to both livestock and

agricultural produce.

Formation of women groups and

training them on entrepreneurship

Community involvement in

identification and opening of

access roads

Integration of HIV and AIDS

programmes in all development

agendas

2.10.6. Education

The county government will be in charge of pre-primary education, village polytechnics,

homecraft centres and childcare facilities.They will continue funding infrastructural

development and other education initiatives

Table 32: Policy thrusts for Education

Problems and their Causes Development objectives Policy Thrusts

Low literacy levels Low

enrolment, retention and

transition rate

Nomadism

Inadequate education

facilities

High poverty levels

Lack of information

Inadequate personnel

Ensure we have good education and quality

education in the County and also make sure that

the 70 per cent retention rate at national level is

achieved in the county

Ensure that the county has good infrastructure

Ensure adequate personnel.

Increase literacy rate;

Improve performance of KCPE from the current

mean grade of 273 to 280 and KCSE from 5.55

to 6.00

increase school facilities by 20%

Increase personnel by 30%.

Intensified assessment and quality

assurance in schools

Hold awareness meetings and

campaigns in schools targeting all major

stakeholders in the county

Improve school facilities e.g. science

laboratories

Hire part time teachers in schools.

Unemployment Lack of

industries to absorb new

entrants

Unemployed

Acquire funds for cottage industries

Increase awareness on the importance of

Initiate skills, training/workshops and

seminars

Initiate case studies and field /industrial

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 95

2.10.7. Energy, infrastructure and Information Communication and Technology

The county transport, including county roads, street lighting, traffic and parking, public road

transport: and ferriesCounty public works and services, including storm water management

systems in built-up areas water and sanitation services, fire fighting and disaster

managementThe national government to invest in energy and more so in renewable energy

Table 33: Policy Thrusts for Energy, Infrastructure and ICT

2.10.8. General economic, commercial and labour

The county government will be in charge of trade development and regulation, including

markets, trade licences, fair trading practices, local tourism and cooperative societies

Table 34: Policy thrusts for the General Economic, Commercial and Labour Affairs

Poor infrastructure

Low levels of technology

Low electricity connections

Low levels of innovation

cottage/small scale industries. attachments and educational tours

Motivational awards of certificate

Problems and their Causes Development objectives

Policy Thrusts

Poor road infrastructure

Lack of funding, poor terrain,

vastness of the county

Adverse weather (seasonal) i.e.

floods

Repair dilapidated roads, construction of new roads

Mapping of dilapidated roads

Prioritising funding of roads

construction through MTEF

To increase all weather road networks

Routine roads maintenance

Sensitize community on road

drainage.

Low ICT services access

Poor infrastructural

development to support

modern ICT facilities

To link the region to the fibre optic cable network

To construct modern ICT centres

Encourage investors to embrace

modern ICT;

empower people to appreciate and

utilise modern ICT facilities

Inadequate power supply Many

areas not connected to national

power supply grid

To alleviate poverty through employment

generation in satellite rural market centres To

supply all market centres and institutions with

electricity.

Connect priority rural areas to

national grid;

sensitise people on alternative

forms of energy

Problems and their

Causes

Development objectives

Policy Thrusts

Under-development of

tourist sites

Lack of funds poor

infrastructure

To raise awareness to all

stakeholders

To map an attraction inventory of

all tourist attraction sites

Improvement of infrastructure

Capacity building of stakeholders

Lack of industries Lack of

funding

Promotion of value addition Construction of industries to process raw products e.g.

meat, fruits and honey Allocating land, funding,

encouraging investors

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 96

Chapter Three

Development Strategy

This chapter develops the strategy that will be used in meeting the challenges identified

in order to realise the aspirations of the people of Baringo over the first CIDP period. It

looks at both what needs to be done and the means that will be used to attain them.

3.1. What does it mean to be developed?

The classic definition of development or ‗maendeleo‘ in local parlance is infrastructure –

roads, water, schools, hospitals and electricity. This document anticipates a broader

definication to include such sustainability concepts like:

1. Social:Security, employment, better standards of life, freedom, gender and

participation in governance and value systems.

2. Economic: Wealth creation, value capture and the equitable distribution of

wealth.

3. Environmental: Quality of the environment and its preservation for future

generations.

Poverty and unemployment are a recurrent issues in the county. Poverty must be understood

to mean, not the lack of resources, but the inability to utilize these resources in meaningful

ways. The development of the county should start from the utilization of resources already

available: The county cannot depend on resources it does not command to solve the problems

it faces. The county government will carry out a comprehensive assessment of the human,

physical, entrepreneurial resource endowment in and determine how to harness the resources

for the development of the county and the wellbeing of its people.

One of the central assumptions of Vision 2030 is that jobs will be created by higher economic

growth. It is clear that, economic growth, without equitable distribution will not result in

significant change in the circumstances of the people. This document is cogniscant that it is

more difficult to lift people out of poverty by redistributing the wealth of the rich. It is

necessary to create new wealth for the people.

The most straight forward way to create wealth and jobs is through the promotion of

competitive business and the pursuit of higher productivity.True jobs are created by

competitive, profitable firms. There is a close correlation between job security and labour

productivity - employees who create more wealth for their employers tend to be more

employable. Accordingly, regional competitiveness and labour productivity should be put at

the core of the proposed policy. The county government will thus formulate and pursue

policies that promote creation of competitive, profitable firms.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 97

3.2. The wealth creation pattern

Figure 7 below illustrates our prosperous cycle, a potential answer to the vicious cycle that

persists in county at the moment.

Figure 17: A prosperous pattern for wealth creation in Baringo

It starts with the identification ofstrategic economic sectors and executing activities that

can improve production in those sectors. This must be done simultaneously with

activities that result in the acquisition of markets for the products. This must quickly be

followed by activities that improve productivity and repeated many times . Figure 18

highlights the key enablers for Baringo‘s economy

Figure 18: Key Enablers for the Economy of Baringo

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 98

3.3. Importance of adopting a strategic approach

The full potential of Baringo in terms of its people, landscape, natural resources, towns,

villages and rural areas and sustainable patterns of development can best be realised by

adopting a strategic focus to further the growth and development needs of the county.

This is because the available resources are not adequate and there is need for trade-offs.

Baringo needs to identify valuable positions, and commit to their pursuit and preserve the

advantages that come from commanding these positions. The following are some of the

advantageous positions that Baringo County shall pursue:

a) Strategic Specialization and Economic Cluster driven Development

Some sectors such as livestock and tourism are very important for Baringo. To realise the

full benefits for development activities, it is important to ensure the firms in these sectors

work closely through clusters. The County Government of Baringo shall promote the

specialisation of regions in certain economic clusters and control the zoning and

development in those sectors for the realisation of growth and a fair and equitable

distribution of development within the county.

b) Delinking the economy from rainfall patterns

The growth of the economy of the county is strongly correlated to rainfall patterns.

Achieving a position where agricultural production is not determined by rainfall patterns

will provide significant advantage in growing the economy of the county. Water

harvesting, irrigation, value addition, reduction of post-harvest losses are some of the

activities that can help bring this delinking. Because of its strategic location, the county

government shall support farmers to also diversify away from agricultural production

into high value, specialised, capital and knowledge intensive sectors such as agro-

services e.g. warehousing, resilient seed production, farm inputs, marketing and regional

branding to protect against the vagaries of nature.

c) Excellence in Governance, Policy Making and Execution

Many of the problems facing the county can be resolved through the enforcement of

existing policies, especially regarding integrity, governance, land ownership, land use,

and environmental protection. The county government shall investits in the

implementation of its policies and transparency. The county government shall also

develop innovative policies that favourably differentiate the county from other parts of

the country. It is also important that a progressive value system is not just upheld by

public officers but by everyone in the county – including farmers, entrepreneurs and

children.

d) Prudent Expenditure

The county government shall commit to a prudent use of the resources under their

custody. This shall call for excellence in procurement and strong oversight and

monitoring to ensure proper utilisation of funds. In particular, the county and national

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 99

governments will utilise ICT for a cost effective and efficient delivery of its services

according to the ICT framework of this document.

e) Decommodification of county products through differentiation and upgrading of

firms using standards

The county government shall assist local firms and farmers to develop products that do

not compete on price, but rather on the additional unique value propositions that they

bring in the market. This will help increase the wealth generated in the county and

reduce the wastage of the county‘s resources. These firms shall also receive assistance on

compliance to standards to ensure they increase access to the market place and are not

locked out through non-tariff barriers.

f) Linkage through transport and communications

The government shall invest in transport and facilitate investment in communications to

ensure that every part of the county is within four hours of an urban area with a

population of 15,000 people or more. The county government shall also promote direct

transportation linkages with second tier towns (without direct linkage with Baringo) such

as Bungoma, Kitale, Narok and Nyeri to enable access to markets and to attract

investment from them.

g) Strategic human capital development

Baringo will invest its resources wisely for the development of its human capital base.

This will call for an appropriate mix of investments in basic and higher education,

scholarships, investment in technical skills, adult literacy and continuous professional

development and the extension services. In all cases, the investments will be indexed

against the needs in the local marketplace.

h) Proactivity and prevention

Baringo will prioritise preventive and proactive investments over reactive investments to

reduce the human and resource cost. In particular, the government shall invest in prudent

environmental management and investment in creating awareness to minimise risks and

costs associated with disasters.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 100

3.4. Overall objectives

The overall objective of this plan is to attain the development vision of the couty in regard to

the aspirations set out in the Bill of Rights under the constitution of Kenya and with particular

consideration for key issues identified during the consultation phase and review of the plan.

Under the Bill of Rights, the Constitution accords the citizens of Baringo the following social

and economic rights:

Table 35: Economic and Social rights under the Constitution of Kenya

Economic and social rights under the Constitution of Kenya

a) To the highest attainable standard of health, which includes the right to health

care services, including reproductive health care

b) To accessible and adequate housing and to reasonable standards of sanitation

c) To be free from hunger and to have adequate food of acceptable quality

d) To clean and safe water in adequate quantities

e) To social security

f) To education

The overall objectives of the County Integrated Development Plan are:

ii. To promote growth in the county by facilitating economic, social and cultural

development throughout the county with due regard to the role of both urban and rural

areas in the overall strategic development of the county.

iii. To define a strong sub-regional role for Baringo as a counter balance to the other

major urban areas of the North Rift and the Mid-Rift region.

iv. To strengthen and enhance the county‘s urban structure and promote sustainable

vibrant rural communities.

v. To promote the future growth and development needs of the county in a sustainable

manner and to ensure that the benefits of economic growth and prosperity are spread

to all parts of the county.

vi. To improve the quality of life and social well-being of all those living, working and

visiting Baringo by ensuring high quality and sustainable residential, recreational,

travel and working environments.

vii. To improve the economic competitiveness of Baringo and topromote and facilitate the

provision of a sound infrastructurebase throughout the county.

viii. To protect, conserve and manage in a prudent and sustainablemanner the

county‘s outstanding natural, heritage andcultural resources and to seek the

enhancement of these resources where appropriate and feasible.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 101

These objectives are not intended to be an end state but rather a general direction as to how

the county can develop, and they will be constanly reviewed. In moving the overall objectives

forward, it is necessary to define some general development aims, in line with the concept of

sustainable development and attainment of the requirements of the Bill of Rights. The

development aims are identified broadly as social, economic and environmental.

3.5. Social development goals

ii. To improve the quality of life of the people of Baringo by ensuring they have access

to basic needs of food, clothing, health, shelter, clean water, education and household

energy.

iii. To develop, social, cultural and community facilities inappropriate locations

accessible to allmembers of the community, with the long-term effect ofsustaining

and enriching the quality of life of residemts.

iv. To ensure that as far as the available resources permit,every family in the county can

obtain a dwelling of a goodstandard located in an acceptable environment, at a price

or rent that is affordable and in a manner that is in accordancewith the principles of

sustainable development.

v. To develop a system of county values that is conducive for the development of the

county in accordance with Chapter Six of the Constitution of Kenya.

3.6. Economic development goals

1. To provide access to water, land, knowhow and collective organisation necessary to

improve economic production, productivity, access to credit and market access for

agricultural output from Baringo.

2. To provide a framework for attracting and retaining investment in Baringo County

while addressing the problems of brain drain, capital flight and perennial

underinvestment.

3. To position Baringo as an attractive place to start and grow world class companies.

4. To promote balanced and sustainable development of all sections of the Baringo

economyand optimise the contribution of the county‘s natural resources while

ensuring that there is adequate infrastructure.

5. To ensure the county‘s natural resources are managed anddeveloped in a sustainable

manner that will ensure they canbe enjoyed by future generations.

6. To ensure sustainable balance between the development andenvironmental

conservation.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 102

3.7. Environmental goals

1. To ensure the conservation and responsible guardianship of Baringo‘s natural and

built heritage for future generations whilst optimising its potential role in sustaining

local communitiesand the overall socio-economic development of the county.

2. To ensure that the resource that is in Baringo‘s biodiversity and water catchment are

conserved and utilised prudently and sustainablyin a manner that will ensure that the

landscape canbe handed on to future generations without being severely degraded.

3. To improve the quality of the built environment in towns andvillages, so that they

develop as attractive viable options forthe attraction of future growth and

development.

4. To maintain and enhance the quality of those physicalelements such as air, water and

soil, that contributes to theenvironment and ensure that homes, towns, rivers and

villages in Baringo are clean at all times.

3.8. Transport and infrastructure goals

1. To develop a high quality, sustainable and integratedtransportation system embracing

the road, rail, air and water transport sectors, with an emphasis on sustainability and

cost effectiveness.

2. To integrate and develop the transportation assets within thecounty, including the

strategic corridors between the northern and southern corridors (both road and rail)

into any regionalplanning strategy.

3. To develop a high quality telecommunications infrastructurethroughout the county as

one means of realising anddeveloping the social and economic potential, particularly

ofthe smaller towns and rural areas.

4. To ensure that the energy supply and distribution throughout the county is expanded

and upgraded sufficiently to enable the economy, enterprise and other developments

to locate in the county.

5. To optimise the development of appropriate renewable energysources which make use

of the natural resource endowment of Baringo County, including hydropower,

geothermal and bioenergy, in an environmentally acceptable and sustainable manner.

6. To develop an environmentally sustainable water supply andsewerage infrastructure

to facilitate economic and socialdevelopment, particularly of the smaller towns and

ruralareas.

All of these goals that make up the overall objectives anddevelopment goals have a spatial

dimension to them in terms of locationand scale of development. In order to guide and direct

them, a spatial framework has been developed to allow the overall strategy to betranslated

into various detailed development targets.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 103

3.9. Development targets

The following section outlines the development targets for the different sectors. These targets have been derived from the existing national

policies.

Table 36: Some development targets in Baringo County

Sector Indicator Current

status

5-year

target

Description

Human development Poverty rate 58% 40% Reduce the poverty rate to less than 40% or the national average

Illiteracy 62% Increase literacy to greater than 90%

Labour productivity - 250,000 Increase average labour productivity to greater than 250,000 per worker

per year.

Unemployment 38% 25% Reduce the unemployment rate to less than 25%

Mean distance to nearest water

point

5km 2km

Rural water 35% 50%

Urban water 60% 80%

Rural energy Access 4% 20%

Urban energy access 35% 50%

Housing andshelter To facilitate the construction of 20,000 units annually

Education Primary school enrollment 140,011 150,000 Expand primary education by increasing the number of classes/schools.

Primary school retention 77% 93.3% Increase enrolment by 16% within the next 5 years.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 104

Transition to Secondary 66.1% 80% Improve transition rate by building more schools and expanding the

current institutions

Secondary school enrollment 29.16% 34.16% Increase enrolment by 13.14%

by increasing streams and providing infrastructure

Retention 98.6% 99.6% Reduce by 1% by supporting needy students – bursary

Re-admitting girls who leave school because of pregnancy

Discourage retrogressive cultural practices e.g. early marriages and FGM

Secondary school transition to

tertiary

67% 75% Increase enrolment by 80% by rehabilitating existing facilities and adult

classes/establish university

Health Finance and stewardship 100% 100%

Service delivery 17% 60%

Service charter Implementation

Quality of nursing care 20% 100%

Customer satisfaction 70% 85%

Prevention of HIV 38% 70%

Automation(IT) 40% 100%

Commodity Management 30% 100%

HR development 40% 100%

Maternal health 30% 40%

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 105

Child health 57% 84%

Community-based info

systems

24 units 60 units

Agriculture, fisheries and

livestock

Annual milk production 23 million

litres

80 million

litres

Increase milk production to over 80,000 million litres per year

Dairy stock 159,000 Increase breeding stock production to over 10,000 per year

Fodder production

Increase meat production to over 100 tonnes per year

Irrigation acreage 1,580 5,000

Irrigation water

Productivity Increase average dairy yield to over 30 litres per animal per day

Industrial Development Value addition Increase MVA to greater than 30% of gross output

Ensure the utilisation of 50% of the hides and skins produced in the

county

Roads and infrastructure Bituminous road 258km 550km Including 50km urban roads

Gravel roads 1,810km 2,400km

Earth/feeder roads 557 1,200km

Environment

Natural resource data 30% 100% Ensure resource data is 100% upto date

Forest cover 33% 38%

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 106

Gabions 10% 80%

Water catchment protection 30% 60%

Dumpsites 0 6 Ensure dumpsites established and fenced in urban centres

Land and Urbanisation Titled land 2 3 Ensure at least 50% of land is titled

Ensure all urban areas are zoned

Ensure development is being controlled

Ensure all urban areas are served with infrastructure

Ensure all urban areas have adequate water

Ensure all urban areas have adequate waste management facilities

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 107

Chapter Four

County Spatial Planning Framework 4.1. Introduction

This chapter presents a spatial framework for Baringo County, from which the 10-year

spatial plan will be developed as per the requirements of the County Government Act

(section 110(1). The development of the spatial plan should be given immediate priority as it

is the basis of all economic and industrial development in the county. Baringo County will

thus develop these plans immediately after the CIDP is adopted.

Spatial planning is an activity centered on making decisions relating to the location and

distribution of land use activities.It refers to the methods used by the public sector to

influence the distribution of people and activities in spaces of various scales. Discrete

professional disciplines that involve spatial planning include land use, urban

planning,regional planning, transport and environmental planning. Other related areas

are economic and community planning. Spatial planning takes place on local, regional,

national and inter-national levels and often result in the creation of a spatial plan.

Regional/spatial planning gives geographical expression to the economic, social, cultural

and ecological policies of society. It is at the same time a scientific discipline, an

administrative technique and a policy developed as an interdisciplinary and

comprehensive approach directed towards a balanced regional development and the

physical organisation of space according to an overall strategy.

Spatial planning brings together and integrates policies for the development and use of

land with other policies and programmes that influence the nature of places and how they

function.

Spatial planning system/process is mandated to ensure that it:

Conserves and enhances the natural environment through the wise use of natural

resources

Mitigates and adapts to the impacts of climate change

Provides the highest levels of protection for Baringo‘s protected habitats, sites,

species and landscapes

Is based on robust environmental evidence and a thorough understanding of

environmental capacity and the cumulative impacts of development

Delivers substantial benefits for the natural environment and people together.

This should include enhancement of biodiversity and landscape, opportunities to

access and enjoy the natural environment and the provision of multi-functional

green infrastructure.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 108

Spatial planning is about anticipating long-term change (and the pressures and

opportunities that emerge from it) and articulating a logical and flexible development

path for a more sustainable and equitable future. The spatial development framework

and associated urban plans achieve this by establishing guidelines about how Baringo

should grow. These spatial plans guide new investment, give effect to the principles and

priorities of the town‘s development strategies, and identify priority areas for strategic

intervention.

With these countywide and urban plans completed and approved, the focus of the

county‘s planning efforts has shifted to the preparation and design of detailed local area

plans and urban esign frameworks.

4.1.1. Role of spatial planning

1. To create the conditions for an enhanced quality of life.

2. To fulfil the aims of efficiency and democracy through public participation.

3. To meet the challenge of sustainable development.

4.1.2. Objectives of spatial planning

One of the main objectives of spatial planning is to ensure that the utilisation of land

resources is planned and implemented in an organised manner to meet the needs of

present and future generations.

4.1.3. Approach required

Spatial planning requires an integrative and comprehensive planning approach in

order to rationalise the appropriate land use activities.

4.1.4. Rationale for spatial planning

1. Baringo‘s urban environment is decaying at a rapid pace hence the need to

establish a county planning framework to accommodate new development and

growth of existing development nodes.

2. To promote and foster development along the principles of the five Ssi.e. Synergy,

Sustainability, Sensibility, Strategic and Supportive.

3. To ensure sustainable utilisation of county land resources.

4.2. The Baringo Spatial Planning framework

Baringo County is constantly changing and growing. To ensure that the county remains a

quality place to live work and invest, as well as to visit, it needs a plan to guide this

future growth and change in the best possible way. This plan is known as the Baringo

County Spatial Development Framework (BCSDF).

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 109

The plans and policies of the BCSDF:

1. Align the county‘s spatial development goals, strategies and policies with those

of the national spheres of government;

2. Indicate areas best suited to urban development, the areas that should be

protected, and the areas where development may occur if it is sensitively

managed;

3. Indicate the desired phasing/zoning of urban development;

4. Guide changes in land-use rights;

5. Help spatially guide, coordinate, prioritise and align public investment

infrastructure and social facilities in the county‘s five-year integrated

development plan.

The SDF does not give or take away zoning rights. The BCSDF will be reviewed and

updated at least every 10 years and the integrated development plan will be reviewed every

year.

4.3. Urbanisation in Baringo County

According to the 2009 Population and Housing Census, Baringo County has over 50

planned centres, three of which qualify as urban areas on population basis. The three

urban areas are Kabarnet, Eldama Ravine and Marigat.

Urban Areas and Cities Act No 13 of 2011 provides for modalities of classifying urban

areas into either cities, municipalities and towns. Some of the centres do not qualify for

any status, particularly like Marigat, which is just at the edge of becoming a town because

of its population. It is for this reason that Sections 8(2) and 10 are to be explored so as to

streamline classification, governance and management of urban areas in the county.

Kabarnet shall, however, play her central role as the county headquarters while Marigat,

Eldama Ravine, Mogotio and Chemolingot shall serve as sub-county headquarters. The

headquarters of the sub-counties and wards shall play the role of cascading development

to the lower levels. Urban areas and trading centres shall continue to play a central role in

commerce and industry, hence planning and implementation of plans is vital. Focus shall

be given to the county, sub-county headquarters and major centres.

4.4. The service centre policy

The number and level of towns are defined by population, the level of social and physical

infrastructure and industrial establishment/developments. Human settlements

aredesignated service and growth centres to improve the quality of life in rural areas and

to complement and stimulate integrated rural development alongside the major growth

centres (Nairobi and Mombasa).

The national government shall define a service centre policy, which will help in guiding

development of different categories of service centres in order of importance. The

classification below is intended to provide a guideline for this activity, designated urban

centres, rural centres, market centres, and local centres.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 110

The functional description of each type of planned human settlement is given as below:

4.4.1. Designated local centres

These centres shall offer the lowest level of service and are intended to serve the

needs of the people within a walking distance. They are designated to serve a

catchment area of up to 5,000 people.

Each such centre shall have a full primary school, several shops, a dispensary, a

public water supply and an open air market. The county corporate communications

team shall maintain a public, official notice board through which information is

disseminated to foster public participation in government activities at all levels. The

centres should be served by a minor road.

Examples of centres that are designated as local centresinclude Koriema, Ossen,

Kiboino, Maoi and Kampi ya Samaki among others. Although most of the centres in

this category have been planned, the plans have not been approved. The plans can,

however, still be used to guide development.

4.4.2. Designated market centres

These centres shall have a residential population of up to 2,000 but are designated to

serve up to 15,000 people in the hinter land.They shall have a primary school, a day

secondary school and a health centre. They shall also be served with a public water

supply, electricity, public transportation, postal (courier) services, mobile money

facilities, a police post and a local bus station (with an airstrip in the remote areas) as

well as other social, commercial and administrative facilities.

Some of the urban areas designated as market centres include: Kabartojo, Mogotio,

Barwessa and Loboi among others.

4.4.3. Designated rural centre

The centresare intended to serve up to 40,000 people and expected to have a

residential population of between 2,000 to 10,000 inhabitants. They are important for

the development of the rural economy and provision of standard amenities.

These centres should have a senior high school, a health centre with maternity facility,

shopping facilities and big markets. These centres should be given priority during the

development of secondary and minimum roads. They should have a piped water

supply, electricity and a sewage disposal system, telephone services, full postal

facilities and banking facilities.

These centres should be served with basic infrastructure to enable them fulfil their

roles as service centres for the rural economy and to encourage the development of

rural industries.

In Baringo, these centres-- Chemolingot, Kolowa and Loruk -- have been planned

though none of the plans have been approved. They still lack the industries and

sewage systems that had been envisaged. The roads connecting all these towns are

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 111

under construction. These centres, however, have the necessary minimum social and

physical infrastructure.

4.4.4. Designated urban centres

This is the highest category of planned service centres. The urban towns within this

category are expected to provide services to a residential population with a population

of over 5,000. These services include a treated water supply, piped sewage system and

disposal plant. These towns should also be serviced with additional infrastructure such

as internal and external roads.The catchment population ranges between 100,000 to

150,000 people.

Thesetownsshall have a fully-equipped hospital, secondary schools, technical colleges

and other higher levels institutions. These centres shall be designed to be focal points

of commercial, industrial, administrative and social services. They are to serve the

present and future needs of the population and the national economy. They shall also

serve as reception centres for rural populations seeking employment and social

benefits.

It should be noted that the county government departments responsible for the

location of physical infrastructure as well as private developers shall ensure that the

facilities are developed strictly as planned.

Kabarnet and Eldama Ravine towns fall within this highest category of planned

service centres. Eldama Ravine has grown from the small centre of less than 2,000

people in the 1970s to approximately 45,000people while Kabarnet has grown from a

small centre of around 2,000 people in the 1970s to around 27,000 people (as per the

population census of 2009). These towns are well served with social infrastructure –

schools, colleges, university colleges, referral and county health facilities although the

enforcement of the spatial plan is weak.

The development of productive activities in the rural areas near these towns shall

continue to provide employment opportunities to people in the towns.

The towns have local physical development plans, which act as a framework to guide

development.

Despite the designation and the consequent preparation of local physical development

plans for these centres, many challenges have hindered the realisation of their

importance. These include:

1. Rapid urbanization: Unplanned human settlement caused by lack of

implementation of prepared plans, urban sprawl and development of

unplanned settlements.

2. High population growth rate versus low economic growth rate leading

to high unemployment rates and poverty in urban areas.

3. Minimal or no community participation in the planning process.

4. Inadequate awareness in planning legislation

5. Inadequate and expensive planning information.

6. Low capacity for plan implementation in the authorities that execute

the plans.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 112

7. Inadequate financing of the planning process and facilitation of the

offices.

8. Inadequate planning equipment and outdated planning technology.

Due to rapid urbaniaation, most of the urban centres in Baringo have outgrown their

current designation. The county government shall reclassify all the urban centres

within the county during the preparation of the spatial plan.

4.5. Connectivity between the service centres

The important transport corridors affecting Baringo are the Nakuru-Marigat-Sudan

Road, Marigat-Kabarnet Road and the Eldama Ravine-Timboroa, all connecting to the

transnational highway (Eldoret-Nakuru Road). Samburu County also connects to the

Southern Corridor and Western Kenya through Baringo County.The towns and the

county as a whole is connected to other parts of the country, for example Elgeyo

Marakwet, Nakuru, Laikipia, Turkana, Nyahururu,Marakwet and the rest of Rift

Valley region although many of these roads are in urgent need of repair. The

connections to the north and east also need additional investment.

4.6. Physical development plans

Table 21 shows the different physical development plans that have been developed for

service centres in Baringo. It is of grave concern that many of these plans are either not

approved or out of date. The county government shall ensure that all these development plans

are approved and up to date.

Table 21: List of development plans for Baringo County

No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS

1. Amaya Not approved

2. Barwessa ,, Revised plan

3. Barsemoi ,,

4. Bekibon Not planned

5. Chemolingot Planned Awaiting approval

7. Cheplambus Not approved

8. Churo ,,

9. Eldama Ravine ‗

10. Emining ‗

11. Esageri ‗

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 113

No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS

12. Kabartonjo ,,

13. Kabarnet Approved on 25/2/1981 Needs revision

14. Kabel Not planned

15. Kaptimbor Not approved

16. Kapsoo ,,

17. Kator ,,

15. Kapchemuso Approved on 15/8/1986

16. Kapchepkor Not approved

16. Kasisit ,,

17. Keturwo ,,

18. Koriema ,,

19. Kiserian ,,

20. Kibingor ,,

21. Kiptagich Approved on 10/8/1990

22. Kapluk Approved on 1/4/1981

23. Kampi ya Samaki Approved on 22/3/1971 Revised

,, Approved on 13/8/1990 Revised

,, Not approved Needs revision

24. Kimalel ,,

25. Kimose ―

26. Kisanana ―

27. Kolowa Advertised Awaiting approval

28. Lelian Not approved

29. Loruk ― Under revision (Ongoing)

30. Loboi Not approved Revised

31. Loropil ,,

31. Maji Mazuri ―

32. Marigat Approved on 26/6/1985 Revised

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 114

No. NAME OF TOWNSHIP/CENTRE STATUS/DATE REMARKS

Marigat Awaiting approval

33. Maron Not approved

34. Marigut ,,

35. Maoi Approved on 22/1/1998

36. Mochongoi Not approved Revised

37. Mogotio ―

38. Mukutani ,,

39. Muserechi ―

40. Olkokwe Island ,,

41. Ochii ,,

42. Oinobmoi ,,

43. Seretunin Approved on 3/3/1982

44. Nginyang Not approved Needs revision

45. Ng‘ambo Approved on 4/10/1982

46. Noiwet -

47. Poror -

48 Radat -

49 Saos -

50 Salawa Approved on 30/3/1986

51 Tangulbei Not approved

52 Talai Approved on 29/9/1982

53 Tenges Approved on16/10/1990 Needs revision

54 Timboiywo Not approved

55 Nginyach Not approved

56 Timboroa ―

57 Torongo ―

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 115

Other towns/centres that have not been included but which will need to be planned

include the following: Emsos, Oldebes, Olkokwe, Mugurin, Ngendalel, Pombo,

Kapnosgei, Kabiemit, Mukuyuni, Kipkitur, Waseges,cheberen,sirwa,kimngorom,

Kibotany, Mototon, Kipnyuguny, Kabirgei, Kipteweret, Poror, Kewangoi, Metipsoo,

Kamasaba, Akorian, Kipcherere, Koroto, Sibilo, Yatia, Ng‘aratuko, Tipingar, Kabaraina,

Moinonin, Ilngarua, Ossen, Kaptun, Kiling‘ot, Sogom, Sumeiyon, Kapkirwok,

Kapkiamo, Kasaka, Kokwototo, Komolion, Orokwo, Kiboino, Kapkokwon, Orokwo,

Kiboino, Kipsoit, Pemwai, Magonai, Akwichatis, Riongo, Cheptuwoyo, Nakoko, Natan,

Nasorot, Ameyan, Napukut, Naudo, Silale Crater Village and Ng‘olong‘.

4.7. Model physical development plan – a case of Marigat Town

The physical plan for Marigat is up to date and awaiting final approval. This section

highlights some of the elements in that plan as a model of what is expected of all the other

plans. The key land uses that are important in the planning process are identified. The

plan also specifies the development standards and strategies that need to be enforced for

the realiation of the objectives of the plan. A summary of this is presented below:

4.7.1. Residential land use (Zone 0)

The plan proposes three categories of residential areas. These are high-density residential

areas (HDR), medium density residential areas (MDR) and low-density residential areas

(LDR). The three categories have separate standards and strategies.

Table 37: Residential land use specifications for Marigat Town

HDR MDR LDR

Minimum plot size 0.045ha 0.08ha 0.1 ha

Maximum plot

coverage

75% 40% 30%

Set

back

frontage 3m 6m 9m

Rear 2m 3m 6 m

Sides 1m each 3m each 6m

Housing types Low housing,High rise

developments in

serviced areas

Building types-Bungalows and

massionettes

Single-family dwelling units

Two bed roomed house with a

servants quarters.

Bungalow, massionettes

Building

materials

Floor cement screed cement screed wood strips, blocks, ceramic

tiles, cement screed and parquet

Walls cut stones, bricks bush stones and bricks

Roof GCI sheets tiles and GCI sheets tiles, GCI sheets

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 116

The following standard practices must be enforced in all the residential zones

- Frequent collection of solid waste

- Provision of waste receptacles for households

- Building plans to be prepared by relevant professional experts

- Issuance of compliance and completion certificates by county authority and the

physical planning department

- Regular maintenance of residential roads

- Proper laying of foundations floors

- All building foundations to be inspected by quantity surveyor and architect

- Piped water to be supplied based on the plan and in HDR to supplement using water

kiosks

- Regular inspection to ensure compliance during construction

4.7.2. Industrial- Zone 1

The plan identifies two types of industrial zones i.e. light industrial zone and heavy

industrial zone. The development standards and strategies for light industrial zones

(Zone11, 12) are as follows:

- Minimum plot size of 0.045 ha – 0.08ha

- Plot coverage of 60%

- There should be regular collection of solid waste

On the other hand, the development standards and strategies for heavy industrial zones

(Zone14) are as follows

- Minimum plot size of 0.2 – 0.4 ha

- Plot coverage of 40%

4.7.3. Education- Zone 2

This includes space for schools, colleges and other education institutions.

4.7.4. Recreation-Zone 3

These include open spaces, public parks for public use.

4.7.5. Public purpose -Zone 4

These are land uses planned for the public use such as; cemeteries, polytechnicsetc

4.7.6. Commercial zone - Zone 5

The development standards and strategies for commercial property is as follows:

- Plot coverage of 90%

- Set back: 6m for plots fronting roads between 10-18m and 9m for plots

fronting roads of above 18m

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 117

- Materials: Walls-blocks, bricks, building stones

- Roof: Tiles, GCI sheets

- Floor: Cement screed, terrazzo tiles

- Confine hawking activities within the market

- Realign plot orientation through planning and cadastral survey

- Provision of security lights on commercial premises as a condition for

issuance of single business permit

- Provision of parking lots at an interval of 100m

- Clearly demarcate service lanes

- Old buildings to be given a face lift through painting

- Ensure approval of building plans before construction

- Inspection of buildings to be done before occupation

4.7.7. Public Utility- Zone 6

These include stadiums, dumping sites, sewage disposal sitesand electricity and water

connections.

4.7.8. Transport –Zone 7

These include roads, rail, airstrips and waterways.

4.7.9. Urban agriculture - Zone 9

Agriculture is categorised under zone 9 as one of the land uses within an urban

setup.It is a supplementary source of livelihood for many households.

4.8. Housing in Baringo County

Housing is a basic right that should be provided to all. It is also one of the functions that

have been devolved to county governments. Baringo County experiences an acute

shortage of housing and there is an urgent need to mobilise investment into housing to

attract entrepreneurs and investors.

During the public consultation fora, members of the Diaspora requested the county

government to put in place a sites and services scheme, whereby they would be invited to

develop housing on sites that have been properly served with infrastructure.The county

government shall establish sites and services schemes in different parts of the county.

The county government shall fast track the issuance of land title deeds for security of

tenure, which promotes investment in housing.

The county government shall disseminate information on low-cost building technology

and provide training to construction workers. The county government shall further

ensure that local construction contractors obtain accreditation from the national

construction authority.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 118

Because housing is capital intensive, the county government shall encourage the

formation of housing cooperatives (building societies) and provide the training required

for their flourishing.

The county government shall further develop a public-private partnership framework for

investments in the housing sector.

The county government shall ensure there is adequate infrastructure in residential areas,

.including access roads, provision of water, electricity and sewer services.

The county government shall coordinate all slum upgrading projects in the county to

include areas in Bondeni in Eldama Ravine, Bondeni and Kaptimbor in Kabarnet and

some areas in Mogotio. The county government shall further facilitate the regularisation

of slums and informal settlements.

The county government shall support the establishment of social and commercial

infrastructure such as schools, shopping centres and recreation/entertainment facilities to

promote the quality of neighbourhoods.

The county government shall develop physical development plans and enforce

development control standards.

The county government shall track housing demand and publish the information for

investment purposes on an annual basis.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 119

Chapter Five

ICT Framework

5. ICT Framework

This section introduces the ICT framework that will govern the use of ICT in the affairs of

the county government of Baringo.

5.1. Introduction

ICT can play a significant role in the development of the county. Baringo already boasts

of a number of globally-competitive ICT firms and an even larger number of local

startups. The county government will take steps to become paperless. It should also be

possible for any public officer to conduct their work from any county premise within the

county.

The County Government of Baringo will leverage ICT to increase public sector

productivity by enabling the delivery of county government services for the people,

communities and businesses while supporting open engagement to better informed

decisions and improving the operations of government. The county government will use

ICT to deliver better services and improve operations and processes aligned with the

national government policy.

In future, the machinery of county government of Baringo will depend on ICT, which

will transform government business and services to meet people‗s expectations for better

services, and to create a more open government. Research points to the important role

that ICT plays in driving productivity.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 120

Figure 19: Role of ICT in the public sector of Baringo

The county government will deliver its vision and increase productivity by using ICT to

achieve three strategic priorities:

1. To deliver better services

2. To establish an open and transparent government

3. To improve government operations

Strategic actions are proposed to support the implementation of each strategic priority

5.2. Delivering better services

The people of Baringo expect high quality, easy-to-use government services.

Implementing this priority will deliver on this expectation. The County Government of

Baringo will develop the capacity and capability within government to better meet

people‗s needs and deliver improved services. The priority strategic action is to develop

capacity and capability across government to use ICT in order to achieve improved services,

effectiveness and efficiencies. All staff of the county government will be trained to use ICT. In

addition, all county premises will be connected into a county-wide area network to enable all staff

to do their work from anywhere within the county.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 121

Table 38: ICT Activities for building capability

Enabling better services by using ICT to simplify and integrate government services to both

people and business while maintaining necessary security and privacy. The government shall

be proactive in acquiring ICT solutions, which, as far as is practicable, will be locally

developed

Table 39: ICT activities for enabling better services

2.1 Deliver simple and

easy-to-use online

services

Deliver automated online services that allow people to interact with the

government and access specific services.

Build an interactive website to simplify people‗s access to government online

services.

Provide people and business with a logon that allows them to consent to sharing

information so that government can provide better, integrated services.

2.2 Deliver personalised

services

Build services to capture, understand, and deliver people‗s preferences when

dealing with government.

2.3 Simplify

government

websites

Have only one website for Baringo County.

Create a common look and feel to all government websites.

2.4 Increase the

automation of

services

Automate processes to improve the interactions between people, business and

government. Upload all government forms to the website for ease of access and

downloading by the public.

Output Activity

1.1 Improve utilisation of

existing technology

capability

Simplify and make consistent business processes for common

activities across government to enable improved and standardised

approaches to service delivery and ICT capability

1.2 Technology and policy

integration and delivery

Build the consideration of ICT capability into policy development and

implementation to ensure policy decisions are delivered in the most

effective and timely way and opportunity costs are recognised.

1.3 Improve government

programme delivery

capability

Build capability across county government and its partners to manage

and deliver ICT-enabled programmes and projects.

1.4 Develop ICT workforce

skills and utilisation

Build on existing ICT workforce planning approaches to make better

use of the ICT skilled workforce across Baringo.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 122

5.3. Open government

The Constitution of Kenya requires that the county governments are run openly and

transparently. The Government of Baringo County will promote the implementation of

transparency and accountability in its operations by using ICT in the strategic actions

below.

Creating and sharing knowledge: To share and manage information and knowledge to

improve decision-making and drive economic growth. The county government will set

up an interactive website for public engagement.

To create the proposed knowledge-based environment, the following actions will be

undertaken:

Table 40: ICT for fostering an Open Government

3.1 Build business

intelligence needs within the county government to improve targeting and delivery of

services.

3.2 Use location-based

information

-of-government direction for the use of

location-based information across agencies.

3.3 Develop tools and

platforms to analyse data analyse customer information so that trends can be identified and used to

better inform policy development.

3.4 Release public sector

information share information and knowledge and unlock economic and social value.

To ensure that appropriate data is transparent and shared rather than

duplicated, the government will implement engagement processes for open

data standards activity and crowd-source priority areas for data standards.

Collaboration: This is by building partnerships with citizens and other stakeholders

to improve the effectiveness of government consultations and service delivery.

The following actions will be undertaken to improve the effectiveness of County

government collaboration:

Table 41: Using ICT for Strengtherning Collaboration

Strengthen external

collaboration networks to improve policy development and service delivery.

community

engagement.

4.2 Build collaboration

capability across

government sector

Create online communities of expertise based around common business

processes to develop and share standardised approaches.

4.3 Build the channels

needed for government to

collaborate

Explore partnerships with industry, academics, the community and third

sector, and with agents and brokers to inform policy and deliver services.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 123

5.4. Improve county government operations

Continuing fiscal constraint will require the county government to make the most

effective use of existing and new ICT investments. This encourages greater innovation in

government operations to enable cost effective solutions. The actions below will enable

achievement of these strategic measures to improve government operations.

Investing optimally: This will enable effective implementation of policy by targeting

ICT investments that deliver the greatest value.

The actions to achieve the objectives of the proposed investment programme are set out

below.

Table 42: Using ICT for Improving Government Operations

5.2 Better Investment

governance and information

Increase the visibility of ICT activities, investments and plans to

reduce duplication and deliver effective value for money solutions.

5.2 Portfolio ICT

investment

• Develop a portfolio approach to strategic ICT investments.

Target ICT investments to develop and use whole-of- government

capabilities.

5.3 Use ICT to leverage county

procurement and remove duplication.

Encourage innovation: This will enable the government to harness the full potential of the

digital economy and enhanced technology solutions to deliver serviceseffectively and

efficiently.

To achieve the innovation aims, the actions below will be initiated:

Table 43: Using ICT to encourage Innovation

6.1 Deliver new and better

ICT-enabled services

• Use ICT to make government services available online

6.4 Examine and adopt new

and emerging technologies

• Quickly adopt new ICT models through a risk-based approach

that balances issues of performance, usability, security, privacy

and investment.

6.5 Marketing of ICT products

developed by youth in the county

• Empowering the youth in the county to develop ICT products

and market them to other counties. Examples Bunifu

Technologies and others who are developing software for

schools and supermarkets

5.5. ICT infrastructure

1. The county government shall establish a county-wide information network to

enable the linkage of all urban and rural centres within the county. The sub-county

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 124

headquarters will be linked through optic fibre connectivity, with wireless

accessibility in all towns of the county.

2. The county government shall establish at least one data centre, one business

continuity site and one offsite facility for data backup outside the county.

5.6. Information security risk management

1. The county government shall conduct an information risk management process

and take measures to ensure that security risks are managed appropriately.

2. The county government shall ensure that its data is adequately protected against

breach of privacy.

3. Have an offsite data backup facility for disaster recovery.

4. Sponsoring staff training on various information security courses.

5. Developing county ICT policy.

5.7. Essential ICT systems

The county government shall establish the following information systems

1. CIDP management system:

The county government shall put in place a system for monitoring implementation

of the CIDP. This system shall track on a quarterly basis progress of all projects

implemented under this plan. The county government shall also establish a project

management system accessible to the public. The system shall hold information

on all proposed, ongoing and completed projects and allow members of the public

to propose additional projects.

2. GIS spatial frameworkCIDP sanagement System:

The county government shall implement an access-controlled GIS system that will

bring together all information on development activities in the county within one

system in accordance with the requirements of section 107 of the County

Governments Act.

3. Sector information systems:

The county government shall establish sector information systems (or integrate

into national systems where available) e.g. health information and education

information systems. These systems shall also offer services to the public and

other stakeholders.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 125

Chapter Six

Disaster Management Framework

6.1. Introduction

This chapter discusses the isaster preparedness of Baringo County and proposes a paln for

preparedness.The consultative process for this CIDP established that Baringo suffers from

regular disasters, including drought, floods, landslides, insecurity, famine and other slow

onset disasters such as HIV and AIDs and invasive species. It is necessary for Baringo to put

in place a robust disaster response framework, which is presented in this section.

Baringo County has witnessed repeated loss of socio-economic development gains to

disasters related to drought, floods, landslides, insecurity, invasive species and HIV/AIDS.

These have adversely impacted lives and livelihoods of communities in the county. In order

to create a prosperous and resilient county, there is need to create a framework for

implementation of DRR approaches that will secure development gains or at least enable the

communities to quickly rebound following disasters. This can only be done effectively with

the full participation of communities in participatory disaster risk analysis (PDRA) to foster

ownership and hence sustainability of development initiatives.

In order to achieve the above, the county government shall establish and strengthen structures

for disaster risk management (DRM) by creating institutions and frameworks for their

operations. Also, the county government shall support PDRA activities at the grassroots to

enable the community to identify development opportunities with DRR perspective.

The outputs from the PDRAs will be contingency plans for disaster preparedness and

response, as well as development plans for disaster prevention, mitigation, recovery and

resilience creation. Financing of the PDRA outputs shall be mainstreamed into CIDP. The

county government will also focus on strengthening county/community level systems

(Community organisation) and structures to ensure the functioning of critical facilities at all

times to save lives and livelihoods. Participatory monitoring, evaluation and learning will be

strengthened to improve knowledge management and to strengthen social audit of

development initiatives to consolidate community participation.

Specific action points

1. Establishment of disaster information management and early warning systems

The county government shall establish a disaster information centre and integrated

drought early warning systema at the county headquarters and satellite offices in Mogotio

and Chemolingot. This will host among other departments a geographical information

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 126

systems department, which will develop a geo-portal and geo-database. It will be tasked

with production of dynamic disaster risk maps and text messaging with selected identified

prevention, mitigation and preparedness interventions.

The information centre shall coordinate the gathering, documentation, analysis, storage

and dissemination of DRR information, including early warning of disaster via various

medium. The information centre shall ensure that early warning information is objective

and relevant to inform DRR planning. It shall be linked to the disaster response teams, the

community and other stakeholders for early action.

The information centre shall serve as a repository for baseline reports, contingency and

development plans, response plans, reports and documentations on success stories and

best practices. The aim will be to make it a nerve centre or DRR information.

2. Establishment of county disaster contingency fund

To support early action, the county government shall establish a county disaster

contingency and strengthen the institutional and financing framework for disaster

management. This will provide an emergency fund for rapid access to finances for

response planning, pre-/post-disaster assessments and meetings, as may be required, for

rapid response activities. The fund shall be tailored to be accessible regardless of the

annual fiscal cycle, for timely and effective response.

The output indicators for this action point will be the inclusion of the county emergency

fund in county integrated development plan. The fund willa have clear administrative

structure with objective access criteria linked to the disasterearly warning system.

The county government shall allow and promote flexibility for diversified stakeholder

resource mobilisation for the fund, both internally and externally, in order to rapidly grow

the kitty. The fund administration shall be structured to be headed by the County Disaster

Risk Management Committee (CDRMC) to consist of identified key stakeholders,

spearheaded by the County Government and the National Drought Management

Authority (NDMA).

3. Participatory disaster risk analysis

The county government shall place communities at the centre of all DRR planning by

supporting participatory disaster risk analysis (PDRA) at ward level. The PDRAs shall

establish baselines and map stakeholders, hazards, local and stakeholder resources

capacities, for intervention initiatives in the wards while identifying opportunities for

resilience building. This will be aimed at reduction of disaster vulnerability and enhanced

adaptation to climate change. There shall be effort to support development of ward-

specific plans incorporating DRR perspectives.

Specifically, the county government, together with partners, will fund community

mobilisation, capacity building, participatory planning, project implementation as well as

participatory monitoring and evaluation. The county government shall establish clear

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 127

policy on community entry and exit strategies, as well as reporting, to be adopted by all

stakeholders.

4. Community action planning (Contingency plans, development plans and monitoring

and evaluation framework)

The county government shall, together with other development partners, support

formation of community DRR organisations at Ward level. These will spearhead

community action planning for formulation of contingency and development plans that

are sensitive to commonly occurring ward-specific hazards. The county government shall

secure funds for these activities through internal and external resource mobilisation.

The specific activities to be funded under this will include DRR mainstreaming

workshops, capacity building forums for community DRR resource mobilisation, action

planning, project cycle management and participatory approaches. Other activities

include situation analysis, options assessment and priority setting. The county

government will also fund ward/sub-county/county workshops for stakeholder mapping

and analyses as well as for the development of monitoring and evaluation framework(s)

for DRR initiatives to foster accountability to stakeholders.

5. Partnership and coordination leadership on DRR activities

The county government shall support efforts by the County Disaster Risk Management

Committee (CDRMC) for the identification and mapping of stakeholders involved in

DRR, climate change adaptation (CCA) and social protection programmes. It will also

support coordinated data collection and analysis on food security and disaster

management. To support and promote collaboration and/or financing agreements and

frameworks, the county government shall support establishment of sector-based MOUs

among stakeholders while strengthening county level technical working groups.

The county government shall support timely production and dissemination of early

warning bulletins and publications as well as joint baseline surveys, joint monitoring, peer

review and learning sessions. The CDRMC shall be facilitated to develop an elaborate

implementation and M&E frameworks, communication and feedback mechanism, while

identifying cross-cutting lobby and/or advocacy themes on DRR around which to rally

stakeholders.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 128

Chapter Seven

CountyIntegrated Development Plan,Linkages

with Other Plans.

7.1. Introduction

This chapter discusses at length the CIDP linkages with the Kenya Vision 2030 and

the Constitution of Kenya. A brief status of Millennium Development Goals at the

County level is also provided.

7.2. Integrated development planning

Integrated development planning is defined as a process through which efforts at

national and devolved levels of government and other relevant public institutions are

coordinated at local level, and through which economic, social, environmental, legal

and spatial aspects of development are brought together to produce a plan that meets

the need and targets set for the benefit of local communities.

7.3. Legislation on integrated planning in Kenya

7.3.1. The County Government Act 2012

The County Government Act 2012, in fulfilment of constitutional requirement to

legislate preparation of county plans, details the goals and procedures of County

Planning (Part XI of the Act). County planners are required to prepare 5-year

integrated county development plans and the annual county budgets to implement

them.

Under Article 100(h) of the Act, county planning is expected to provide a platform for

unifying planning, budgeting, financing programmes, implementation and

performance review. A county planning unit shall be responsible for coordinated

integrated development planning. County plans will have the goal of promoting

harmony with national and other county plans, land-use plans, urban planning and

environmental conservation.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 129

The County Government Act, 2012, section 104 (1), states that a county government

shall plan for the county and no public funds shall be appropriated without a planning

framework developed by the county executive committee and approved by the county

assembly. It also states that the county planning framework (as in the definition

above) shall integrate economic, physical, social, environmental and spatial planning.

In addition to an integrated county development plan, each county is expected to have

the following:

a) A county sectoral plan

b) A county spatial plan

c) A city and urban areas plan

These county plans (section 107(2)) ―shall be the basis for all the budgeting and

planning in a county.

7.3.2. Transition to Devolved Government Act, 2012

Under the Transition to Devolved Government Act (2012), the transition authority is

expected ―to provide mechanisms for capacity building requirements of the new

county authorities to prepare the appropriate plans and budgets.

7.3.3. Public Finance Management Act (PFMA), 2012

The Public Finance Management Act (PFMA), 2012, emphasises what the County

Government Act states but puts a slightly different emphasis on planning. Whereas

the County Government Act requires a five-year County Integrated Development

Plan, the PFMA (Part IV (126) (1)) requires both a long-term and medium term plan.

According to the PFMA, a budget process for the county government in any financial

year shall consist of the following stages:

a) Start with an integrated development planning process, which shall contain both

shor-term and medium-term plans.

b) Every county shall prepare a development plan as per Article 220 (2) of the

constitution.

c) Budgets are to be based on projects and other expenditure contained in the plan.

7.3.4. Urban Areas and Cities Act, 2011

Urban Areas and Cities Act (2011) is also emphatic on the need for a 5-year

integrated development planning and the need to align annual budgeting to the plan.

These plans are separate from those of the county. In section 36(2), it states that an

integrated urban or city development plan shall bind, guide, and inform all planning

for development and decision-making and ensure comprehensive inclusion of

functions.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 130

7.4. CIDP Linkages with Kenya Vision 2030 and Medium Term Plan

Sessional Paper Number 10 of 2012 on Kenya Vision 2030 is the National Policy Economic

Blueprint that entrenches Kenya Vision 2030 as the long term development strategy for

Kenya. The Kenya Vision 2030 aims at transforming Kenya into a modern, globally

competitive, middle incomecountry providing a high quality of life to all its citizens. Kenya

Vision 2030 is a product of highly participatory, consultative and inclusive stakeholder‗s

process conducted throughout the country and in all sectors of the economy.

The Vision is anchored on three key pillars: Economic, social and political.

The economic pillar aims at achieving an average Gross Domestic Product (GDP) growth

rate of 10 per cent per annum and sustain the same till 2030 in order to generate more

resources to reinvigorate the economy to meet its envisaged goals and aspirations. The key

sectors in this pillar include: Tourism, agriculture and livestock, manufacturing, wholesale

and retail trade, Business Process Outsourcing (BPO) and financial services. A seventh

sector, oil and mineral resources, has now been added, taking cognisance of the recent

developments.

The social pillar seeks to build a just and cohesive society with social equity in a clean and

secure environment. The main sectors under this pillar include education and training, health,

water and irrigation, environment, housing and urbanisation, gender, sports, youth and

culture. The political pillar aims at realising a democratic political system founded on issue-

based politics that respect the rule of law and protects the fundamental rights and freedoms of

every individual in Kenya.

The three pillars are anchored on a number of foundations, which serve as enablers that create

an environment that is geared towards the realisation of Vision 2030. These include:

Macroeconomic stability; continuity in governance reforms; enhanced equity and wealth

creation opportunities for the poor; infrastructure; energy; science, technology and

innovation; land reforms; human resource development; security and public sector reforms.

An additional enabler - national values and ethics - has been included following the passing

of the Constitution of Kenya 2010.

The Kenya Vision 2030 is phased to be implemented in successive five-year medium-term

plans. The first plan covered the period 2008-2012. The Medium Term Plan (MTP 2013-17)

is the second in a series of successive five-year plans under which the Kenya Vision 2030 is

to be implemented. The second MTP 2013-2017 draws on lessons learnt in implementing the

first MTP. It seeks to implement the flagship projects identified under Vision 2030 over the

five-year period together with incomplete flagship and other projects and programmes in the

previous MTP. It will also take due cognisance of the devolved structure of government

following promulgation of the Constitution of Kenya 2010 and recent discovery of oil and

mineral resources.

The broad key priority areas,which will be the focus of the second MTP include:

Employment creation; development of human resource through expansion and improvement

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 131

in quality education, health and other social services; reducing the dependence of the

economy on rain fed agriculture through expansion of irrigation; higher investment in

alternative and green sources of energy; improving the economy‗s competitiveness through

increased investment and modernization of infrastructure; increasing the ratio of saving,

investment and exports to GDP; implementation of key Kenya Vision 2030 Flagship projects,

including development of LAPSSET Corridor; improving national security; promoting

national values and ethics; and continue implementing the constitution.

County Government Act, 2012, stipulates that county government shall plan for the county

and no public funds shall be appropriated outside a planning framework developed by the

county executive committee and approved by the county assembly. This Act, along with the

Public Financial Management Act, 2012, therefore calls for preparation of a County

Integrated Development Plans (CIDPs), which must be aligned to the national development

plan. In view of this, CIDPs and other plans provided in the County Government Act will be

aligned to Kenya Vision 2030 and the MTP 2013-2017. As such, CIDPs will provide the

essential linkages of the national and county governments by facilitating the implementation

of Vision 2030 flagship projects as well as other projects and programmes that will ensure

implementation of Kenya Vision 2030 at both levels of government.

County governments must, therefore, embrace the Kenya Vision 2030 and MTPs during

preparation of county development plans. In particular, they are envisaged to support

implementation of Vision 2030 flagship projects that may be domiciled in or cut across the

counties. In addition, counties will need to identify specific projects and programmes for

implementation over the medium term period towards achievement of the Kenya Vision 2030

and MDGs.

The county development profiles form the basis for county planning and development

process by providing the requisite benchmarks and information required for preparation of

the CIDPs.

7.5. CIDP Linkages with the Kenya Constitution, 2010

The Constitution of Kenya (2010) prescribes national values and principles of governance

which include sharing and devolution of power. It creates a two-tier government: a national

government and 47 county governments. The Fourth Schedule delineates the functions of the

national and county governments. A total of 14 functions have been devolved to the counties.

The main ones include: county planning and development; agriculture; county health

services; control of air pollution, noise pollution, other public nuisances and outdoor

advertising; cultural activities, public entertainment and public amenities; county roads and

transport; animal control and welfare; trade development and regulation; pre-primary

education and village polytechnics; specific national government policies on natural

resources and environmental conservation; county public works and services; fire fighting

services and disaster management; and, control of drugs and pornography. Emphasis is also

made for the counties to ensure participatory development and capacities are developed at the

county and community level.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 132

Five laws which provide the framework for devolution have been enacted, namely: Urban

Areas and Cities Act, 2011; The County Governments Act, 2012; The Transition to Devolved

Government Act, 2012; The Intergovernmental Relations Act, 2012 and The Public Finance

Management Act, 2012.

The PFM Act 2012 provides for effective and efficient management of public resources.

Article 125 of the Act requires the budget process for county governments in any financial

year to consist of integrated development planning process which include long term and

medium term planning as well as financial and economic priorities for the county over the

medium term. Articles 126 of the Act further obligates each county government to prepare an

integrated development plan that includes strategic priorities for the medium term that reflect

the county government's priorities and plans, a description of how the county government is

responding to changes in the financial and economic environment; and, programmes to be

delivered.

The county governments are composed of the county executive committee and county

assemblies. The county executive committee is expected to supervise the administration and

delivery of services to citizens as well as conceptualise and implement policies and county

legislation. The county assembly is a legislative organ and will play an oversight role on all

county public institutions including the urban areas and cities. The county governments are

required to prepare the CIDPs to enable prioritisation of socio-economic development issues

at the local level. This is mandatory before the funding of county projects and programmes.

The CIDP, therefore, seeks meet this requirement and ensure that there is a comprehensive

planning tool upon which planning at the county can be done as per the requirement of the

constitution of Kenya 2010 and other legislations thereafter.

7.6. Implementation of Millennium Development Goals at the county

The Millennium Development Goals (MDGs) are internationally accepted standards for

measuring progress towards poverty alleviation. They were agreed upon at the UN

Millennium Summit in 2000 where world leaders made and adopted a declaration to ―free

all men, women and children from the abject and dehumanising conditions of extreme

poverty’. The eight MDGs to be met by 2015 are drawn from this declaration. The eight

MDGs have time-bound targets and indicators for measuring progress in the areas of: poverty

alleviation, education, gender equality and empowerment of women, child and maternal

health, reducing HIV/AIDS and communicable diseases, environmental sustainability, and

building a Global Partnership for Development. Kenya is one of the signatories to the

declaration and is committed to achieving the MDGs. This commitment has resulted in

commendable progress in achieving a number of these goals though some are still facing

challenges. As we pursue development agenda at the county level, we need to fast track the

achievement of these goals. With only two years to the end of the MDGs period, a group of

world leaders appointed by the UN secretary general are working together to find the best

way to tackle global agenda on development after 2015. The post 2015 agenda will have

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 133

shared responsibilities for all countries and with the fight against poverty and sustainable

development at its core. This agenda will be cascaded in the MTP and CIDPs in order to

build upon commitments already made and contribute to the acceleration of achievement of

the targets both at the national and county levels.

Some of the challenges facing the achievement of MDGs in Baringo County are: Inadequate

resources for financing MDGs related activities; Declining agricultural production due to

unpredictable rain patterns and land fragmentation; high population growth rate; over reliance

on agriculture and export of unprocessed agricultural products; and Illegal and extensive

logging without replacing the felled/cleared trees/forests.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 134

Chapter Eight

Resource Mobilisation Framework

8.1. Introduction

This resource mobilisation strategy is developed cognizant of the tremendous

development challenges faced by Baringo County; with the realisation that Baringo

County Government will take the lead in raising revenues for development. This

chapter contains a budget projection required for managing the county government. It

also indicates the resources that are available for capital projects development. It

outlines strategies for raising revenue and their projected for the plan period. In

addition, strategies for asset management, financial management, and capital

financing are included. This includes, but not limited to, strategies to expand the

revenue generation, resource sharing with the central government, means of attracting

external funding. This strategy, therefore, provides the basis for mobilising funds

required to support the county government mandate.

8.2. Trends

Funding for county government is anchored in the Kenya Constitution, which

provides that the not less than 15 per cent of audited accounts in government shall be

disbursed to the County Government. In 2012-2013 financial years, the County

Government of Baringo received Sh3.4 Billion. It is anticipated that this shall increase

annually as the national budget increases and as the Baringo County economy grows.

8.3. Constraints to resource mobilisation:

Although it is anticipated that resource mobilisation will yield more than just money,

past experience shows that a great deal of funds are not channelled to proper priorities

nor applied nor applied to contributing to holistic growth in development. The County

Government of Baringo will put structures in place and enact legislation to ensure

effective application of funds.Specifically, the county will endeavour to get value for

money and will properly harmonise use of funds to reduce transaction costs.

This involves enlisting of all necessary resources, be they human, material or services,

to achieve specific goals. It involves the mobilisation of knowledge for human use of

skills, equipment and services.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 135

The first step will be resource mapping, which includes:

1. Assessment of the baseline position of the resources

2. Identifying required resources for the project

3. Comparing what is needed and what is available to determine the gaps

4. Identifying potential sources of needed resources and

5. Outlining best strategies for approaching stakeholders (donors and partners)

6. Outlining monitoring and review mechanisms.

7. Documentation of all activities

8.4. Capital projects funding

Capital projects as contained in this plan will be funded through budgetary allocation

from the central government, through the resources raised from the local sources and

through grants and loans from development partners. There will also private sector-

public sector collaboration.

8.5. Strategies for raising revenue

The Kenya Government is increasingly constrained in mobilising the required

financial and technical resources to cope with the rising demand for development

projects and provision of services. Rapid economic growth, growing urban

population, increasing rural–urban migration, and all-round social and economic

development have compounded the pressure on the existing infrastructure, and

increased the demand-supply gap. Further, donor commitments, though appealing,

have been unable to bridge the financial requirements gap.

National governments in developing as well as developed countries have been using

Public Private Partnerships (PPPs) arrangements for improved delivery of services.

Governments have built or are building transport (roads, railways, toll bridges),

education (schools and universities), healthcare (hospitals and clinics), waste

management (collection, waste-to-energy plants), and water (collection, treatment,

and distribution) infrastructure through PPPs. PPPs are, therefore, becoming the

preferred method for public procurement of infrastructural services throughout the

world.

In Kenya, there has been considerable progress in the last 5 years in attracting private

investment into the country. There is however, potential for PPPs to contribute more

and help bridge the gap. To this end, the Kenyan Government has developed a PPPs

framework which will be modified by the government of Baringo to address local

concerns.

Baringo County will strive to use the developed framework, host forums and

conferences to woo investors. The county will further be compelled to explore new

and innovative financing methods in which private sector investment can be attracted

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 136

through a mutually agreed arrangement. Since neither the public sector nor the private

sector can meet the financial requirements in isolation, the PPPs model presents a

logical, viable and necessary option for them to work together. It is hoped that PPPs

will deliver efficiency gains and enhanced impact of the investments. The efficient

use of resources, availability of modern technology, better project design and

implementation, and improved operations combine to deliver efficiency and

effectiveness gains, which are not readily produced in a public sector project. Further,

the long gestation period of infrastructure projects requires sustainable financial and

operational capacity. Therefore, there is increasing reluctance in both the public and

private sectors to absorb all the costs and assume all the risks of building and

operating these assets alone.

The county also expects to gain from resources mobilized by the national treasury.

According to Article 226 of the Constitution, it is the duty of the national treasury to

mobilize domestic and external resources for financing national and county

government. Loans will another source of funding. The county treasury is in charge of

mobilising resources for funding the budgetary requirements of the county

government and putting in place mechanisms to raise revenue and resources.

The county also expects to receive grants from development partners for various

projects. It should be noted that under the PFM Act 2012, regulations approved by

parliament shall provide for the administration, control and management of grants,

including procedures to ensure that grants are spent on the basis of the ICDP.

8.6. Establishment of Baringo investment vehicle (Baringo Investment Corporation)

This will be established to make Baringo a county of choice for investments. It will be

organized along the lines of the Kenya Investment Authority created by the

Investment Promotion Act No. 6 of 2004. It will also formatted along the lines of

Industrial and Commercial Development Company (ICDC).

Its principal mission will be to attract, facilitate, retain and expand county, intra-

county, national and international investments to Baringo. Because of the many

requests for factories and other commercially viable investments, it is proposed that

this investment vehicle shall operate a capital fund that can take debt and equity

positions in strategic projects. This fund shall be run strictly along standard venture

capital practices, including a maximum exposure, project feasibility and stringent exit

requirements.

8.6.1. Mandate

Its main mandate will be promoting investments in Baringo. It will be responsible for

facilitating the implementation of new investment projects, providing after care

services for new and existing investments, as well as organising investment promotion

activities within the county, nationally and internationally.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 137

The core functions of Baringo Investment Corporation will include: Investment fund

management, investment promotion; investment facilitation, which includes investor

tracking and after care services. The activities are carried out through the following

strategies:

Establishment of holding companies to invest on behalf of the county

Generate income for Baringo County.

Research, policy advocacy and planning: Undertake research, review and analyse

policies, and engage in policy advocacy geared towards improving the business

environment.

Investment promotion and marketing: Targeting and attracting investments to

achieve increased economic development.

Investor services: Ensuring expeditious and quality facilitation of projects for prompt

implementation and effective after care services.

Corporate governance and ethics: Uphold good corporate profile for Baringo

County and ensure observance of good corporate governance and attend to legal

affairs related to the investors.

Internal Audit: Monitor and evaluate management policies, procedures, regulations

and systems to ensure compliance with the best practices for effective utilisation of

organisational resources.

8.7. Assets and financial management

The national treasury is expected to design and prescribe an efficient financial

management system for the national and county governments to ensure transparent

financial management and standard financial reporting as contemplated by Article 226

of the Constitution. The county treasury, subject to the Constitution, will monitor,

evaluate and oversee the management of public finances and economic affairs of the

county government, including developing and implementing financial and economic

policies in the county; preparing the annual budget for the county and coordinating

the preparation of estimates of revenue and expenditure of the county government;

coordinating the implementation of the budget of the county government; mobilizing

resources for funding the budgetary requirements of the county government and

putting in place mechanisms to raise revenue and resources.

The County Treasury will also ensure compliance with accounting standards

prescribed and published by the Accounting Standards Board from time to time. It

will also ensure proper management and control of, and accounting for the finances of

the county government and its entities in order to promote efficient and effective use

of the county's budgetary resources.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 138

8.8. Resources from the National Government

To support the devolution framework, several acts of parliament have been enacted:

The Urban and Cities Act 2011; The County Government Act, 2012; The transition to

Devolved Government Act 2012; The Inter-government Relations Act, 2012; The

Public finance management Act, 2012; The County Government Public Finance

Transition Act, 2013. The Constitution and many of these laws require ―integrated

development planning‖ as the process of enhancing efficiency and effectiveness of

budget fund and mechanism for addressing the county mandate under the

Construction of Kenya, 2010.

Release of funds from the national government will depend on whether a county has

developed an Integrated Development Plan. Part XI of the County Government Act

2012 obligates the county government to ensure harmony of the integrated

development plan with the national plans, and other sub-county plans such as sectoral

plans, spatial plans and urban and city plans which are located in the county. In

accordance with article 106, the plan will thereby provide mechanisms for linking the

county and national planning processes with the MTEF budgetary system.

The budget process for county governments consists of an integrated development

planning process, which include both long term and medium term planning. The

integrated plan establishes financial and economic priorities for the county over the

medium term and makes an overall estimation of the county government's revenues

and expenditures. Based on the Commission on Revenue Allocation, Baringo County

is expected to receive Sh3.4 B for the financial year 2013/14. This allocation has been

determined based on the county population (45%), poverty index (20%), land area

(8%) basic equal share (25%) and fiscal responsibility (2%). Although prorated,

prudent public resource management as stipulated in the PFM Act 2012 will

determine the amount the county receives in future on fiscal responsibility.

8.9. Strategies for Mobilising Baringo County human capital

The Baringo County Government will mobilise and establish a databank of

Professionals from Baringo who reside within the County itself, nationally and

internationally to engage them in the development of Baringo County. It will

specifically engage the people of Baringo in diaspora in investments and

developments in Baringo.

Other national and international friends and well-wishers of Baringo will also be

engaged.

The governor‘s office will delegate the county executive in charge of human resource

to coordinate this function.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 139

8.10. Other strategies for Mobilising county resources

This will include:

a) Proceeds from royalties for minerals including petroleum, steam and water.

b) Proceeds from investments by the counties Corporations in energy, factories,

hotels and buildings.

c) Selling commercial paper with the concordance of the national government.

d) Developing housing bonds.

e) Setting up county lotteries to fund such programs as; sports, education, loans

and roads.

f) Engaging the national government to offer tax incentives to potential

investors.

g) Using the Built, Operate, and Transfer Model (BOT) to put up social and

commercial infrastructure.

h) Conscessioning of roads and other infrastructure.

i) Mobilizing land rates and other property taxes under the county government.

j) Preparing and implementing policy to govern development of public land

allocated to investors with a view to optimal collection of revenue.

k) Entry fees from game reserves.

l) Proceeds from cess on agricultural produce.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 140

Chapter Nine

Investment Framework

Introduction

This chapter on investment framework seeks to provide a mechanism for the government

to allocate its resources among the various projects proposed to questions such as how

the identified projects will be selected and how they will be financed.

9.1. Allocation of resources among sectors

The executive shall determine the allocation of resource among the various counties in

the county. The following is suggested as a guideline:

Table 44: Consideration for resource allocation among sectors

Sector Target Rationale

Agriculture and Rural

Development

10% of budget and 6%

Annual growth in agriculture

Maputo Declaration, July 2003

Health 15% of budget to health Abuja Declaration

Energy, Infrastructure and

ICT

for every 1% growth in the

economy there must be a 2%

growth in energy supply

Rule of thumb

9.2. Project selection framework

1. Feasibility assessments will be conducted before any projects are implemented to

ensure that projects are viable.

2. The county government shall provide guidelines for the evaluation of all projects

to determine their feasibility and cost effectiveness before they are implemented.

3. The county government shall identify the criteria against which every project will

be scored and a weight against which each of these factors shall be applied. An

initial set of factors and corresponding weights is defined below:

4. All projects shall be scored against these factors and then ranked based on their

scores.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 141

Table 45: Weights to be assigned to different factors when selecting projects

Factor Weight

(points)

Rationale

Prioritisation from

community

-5 to 15 Ensures that community interests are well taken care of. A project with

a negative rating means there are members in the community who do

not want the project.

Prioritisation by

experts /heads of

department

10 Allows government officials to provide their professional inputs

onwhich projects are implemented.

Prioritisation on

strategic basis

20 Allows the county leadership to provide their scoring against each

project to give priority to projects that have strategic value to the

county.

Impact on people 20 Allows ranking of projects based on their impact on security, job

creation, health, education, equity and disaster preparedness.

Impact on

environment

-5 to 5 Allows the promotion of projects that have a positive contribution to

the environment

Impact on the local

economy

10 Allows for the promotion of projects that have a significant impact on

job creation, wealth creation and opening up investment opportunities.

Total 100

9.3. Public investments

1. Public spending will include administrative, social and infrastructural expenditure

2. The constitution requires county governments to further the cause of devolution

beyond the county level. To attain this, the county government shall set aside at least

15 per cent of its development budget for a Ward Development Kitty, which shall be

used for the financing of projects at the ward level. This fund shall operate along the

same lines as the constituency development fund but shall be administered by the

county executive with the participation of the community.

3. The county government shall ensure that the ward development fund is distributed

equitably among the wards, having regard to a need for equalization among the wards.

The county government shall also set aside 0.5 per cent of its budget for an

equalization kitty, which shall be used to address development in marginalised areas.

4. The county government shall ensure there is prudent use of resources deployed to the

ward development fund.

5. The county government shall identify flagship projects at the county and sub-county

levels. Flagship projects shall not include routine programmes and services, but shall

be transformative projects with significant impacts among multiple stakeholders.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 142

6. Flagship projects at the sub-county level shall be implemented using the resources of

the constituency development fund with additional support (if requested) from the

county government.

Figure 20 : Development through use of public funds

9.4. Private investments

1. The county government shall maintain an investor friendly business environment. In

particular, the county government shall ensure there are no undue delays in the

licensing of businesses or unjustified barriers.

2. The county government shall earmark and publicise projects for investment by the

private sector as well as projects suitable for PPP investment

3. The county government shall facilitate the mobilisation of resources through

cooperative societies and investment clubs.

9.5. Public-Private Partnerships

1. The county government shall establish a PPP node as a contracting agency in

accordance with the Public-Private Partnerships Act.

2. The Baringo PPP node shall actively develop PPP projects in all sectors in accordance

to the law.

9.6. Public-Public Partnerships

The county government is encouraged to pursue partnerships with other public institutions:

1. The county government of Baringo shall pursue partnerships with county

governments, the national government and parastatals provided they remain within

the parameters defined by the intergovernmental relations act.

2. The county government shall enhance cooperation and benchmarking with other East

African national and regional governments.

3. The county government shall cooperate with the UN and other international

organizations for the benefit of the people of Baringo.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 143

4. The county government shall actively pursue international partnerships with other

towns and cities such as twinning urban areas and shall make effort to join the R20

group of regional authorities.

5. The county government shall actively seek opportunities for south-south cooperation

including hosting and participating in trade fairs, sports activities and exchange

programmes.

6. The county government shall maintain cordial relations with other non-state actors

e.g. NGOs, the media and professional bodies and actively pursue beneficial

partnerships with them.

9.7. Role of public procurement in the economic development

The government being the biggest spender has the opportunity to stimulate development,

especially in the manufacturing sector through public procurement. This provides a means

for the capitalisation of local enterprises, development of local capacity and creation of

jobs.

The county government shall set up and operationalise a policy to guide the use of public

procurement to promote economic and social development along the following lines:

1. The county government shall reserve at least 30 per cent of all public procurement

for youth and women led enterprises.

2. The county government shall procure not less than 50 per cent of its furniture and

uniforms (clothing) from local manufacturers.

3. The county government shall establish a procurement window for locally

manufactured products and define a list of additional products that shall be given

preferential procurement when locally manufactured.

4. Where the county government undertakes any construction activity, at least 30 per

cent of the wood, metal and concrete products shall be fabricated locally unless

local capacity is reliably established to be absent, or exemption has been granted

by the county assembly. Additional services e.g. clerical work, transport, unskilled

labour and security shall also be procured locally.

5. The county government shall not procure more than 50 per cent of its hospitality

services from outside the county.

6. The county government shall spend at least 15 per cent of its advertising spend on

local media institutions to promote the growth of homegrown media.

7. Where local capacity is absent, the county government shall require external

contractors to subcontract at least 15 per cent of their work to local firms.

8. The county government shall provide additional incentives for companies that

form consortia to encourage cooperation within the sub-sectors.

9. The county government shall offer procurement opportunities for all sizes of

enterprise and encourage graduation and improvement in quality and size among

its suppliers

10. The county government shall automate its procurement systems and promote

transparency and efficiency in its operations.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 144

11. The county government shall report to its adherence to the above guidelines on an

annual basis

12. The county government shall take measures to increase the capacity of local firms

to participate in the procurement of the national government.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 145

Chapter Ten

InstitutionalFramework The chapter outlines the institutional framework and organisational flow that will be followed

in implementing the plan. It also outlines the stakeholders in the county, and the roles that

they play and how their functions are accommodated to avoid duplication of efforts.

10.1. Sectoral plans

CIDP shall be implemented through sectoral plans which shall be developed for the following

sectors as required by section 107 of the County Governments Act.

Sector Subsectors

Agriculture and rural development Livestock, agriculture, fisheries

General economic and commercial

affairs

Commerce and trade, tourism, industry, enterprise development,

cooperatives

Energy, infrastructure Roads, airstrips, energy, transport, public works

Land, environmental protection,

water and housing

Environment, forest, land, survey, mining, housing, physical

planning, water, irrigation, sanitation

Health Medical, public health

Education and ICT ECD, village polytechnics, ICT

Governance, justice, law and order County assembly, disaster management, peace building

Social protection culture and

recreation

Labour, women, children, persons with disabilities, elderly, youth,

minorities and vulnerable groups

Public administration and

international relations

County executive, economic planning, statistics

Spatial plan

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 146

10.2. Organisational flow

Figure 21 : Organisation of the County Government of Baringo

10.3. Devolved County Level Units

The units are responsible for policy formulation, guidance, service provision and

enforcement of rules and regulations. The units are also responsible for prioritizing in

their operational areas.

County

Government

COUNTY

ASSEMBLY

COUNTY

SPEAKER

COUNTY

ASSEMBLY

MEMBERS

COUNTY

ASSEMBLY

COMMITTEES

COUNTY

ASSEMBLY

SECRETARIAT

COUNTY

PUBLIC

SERVICE

BOARD

COUNTY

PUBLIC SERVICE

BOARD

SECRETARIAT

Governor

Deputy Govenor

County Executive

Members

Chief Officers

Directors of

Departments

Officers and Support

Service Providers

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 147

CIDP Implementation Secretariat Headed by a Director based in the Governor‗s

Office, will be responsible for tracking and ensuring the Implementation of the plans

and proposals of the CIDP across all sectors. The Secretariat will also guide annual

reviews of the CIDP as may be necessary in Consultation with the County

Departments of Planning.

The Secretariat will ensure the creation of appropriate policies to guide development

programs in Baringo County. The Annual Budget of Baringo provides funds for

development of policies and legislations in Baringo County.

Stakeholders: Are responsible for prioritizing county programmes and projects while

ensuring sustainability and ownership. They also fund programmes and projects.

Stakeholders: Are responsible for prioritizing county programmes and projects while

ensuring sustainability and ownership. They also fund programmes and projects.

10.4. Stakeholders in the County

Table 46: Stakeholders and their roles in Baringo County

Stakeholder Role

Cabinet office Ensure quality and timely approval of policies

CDF/CDTF Construction, rehabilitation, equipping of facilities in the county

Church Participate in decision making

Civil society organisations Creation of awareness on rights and privileges of the public

Management and promotion of good governance through advocacy of the rights of

the minority and farmers.

Management and promotion of good governance.

Support the sector through hand washing in educational facilities, provision of

equipment, water facilities, construction of facilities, and watchdog for quality

service delivery and supporting the school feeding programme.

Drilling of water points, toilets. Establishment of biogas units, mobilisation of the

community.

Civic education

Orphan support;

Extension service and micro finance

Community

to monitor projects

Utilise infrastructural facilities, provision of skilled/ unskilled labour;

Identify facilities to be repaired/ rehabilitated.

Participate in decision making on issues affecting the sector and provide factors of

production for use by the sector

Care and provide for the sick;

Provide land to construct facilities;

Actively support the community strategies through active participation;

To actively participate in and contribute to the provision of facilities through cost

sharing;

Community policing, collaboration with security agents;

Active participation in prioritization of projects and provide information on

corruption;

Engage in farming, production of food crops, conservation of hill tops, provision of

labour to be used in the sector and the management of private tree nurseries and on

farm tree planting.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 148

Stakeholder Role

Construction of toilets and spring protection.

Development Committees Mainstreaming gender, youth, physically challenged and other disadvantaged

groups issues into development programmes

Directorate of E-GOK Facilitating provision of E-GOK services, email, web-enabled services.

Donors Inject new resources in form of credit, grants and material support.

Farmers‘ Organisations;

SACCOs

Extension services and community mobilization.

Finance Institutions Avail credit; create awareness

National Government

Ministries/Departments

Policy formulation, guidance, service provision and enforcement of rules and

regulations

Kenya Diary Board Regulation of milk marketing

Kenya National Bureau

of Statistics (KNBS)

Collection and dissemination of consumable data for planning purposes

Local Authorities Maintain unclassified roads, Put up new river crossings

Open new roads. To promote the growth of ICT through faster licensing of outlets

Provide grants for school infrastructure development Ensure adequate

environmental sanitation.

Maendeleo ya Wanawake Advocate for the right of women and the girl child

Siret Empowerment Co.

Ltd.

Owners of Siret Tea Estate and Factory. Investors in Real Estate across Baringo

County and Scholarship programs for their members and the local Community.

National Aids Control

Council

Provide policy guidance on halting and the reversing the spread of HIV/AIDS;

Support OVCs and People Living with HIV/AIDS

National Council for

Persons with Disability

Enhance capacity of disabled person‗s organizations, institutions and individuals;

Support educational institutions for physically challenged

NEMA Environmental audit (EIAs).

Parliament Formulation and passage of sector laws & policies, provision of conducive legal

environment

Private Sector Partners in service provision;

Employment creation;

Promotion of private enterprises and competition and supplement government

effort through PPP Formulation of priorities.

Red Cross Distribution of relief foods and of medical supplies during emergencies and

capacity building on disaster management

Trade Unions Promotion of HR management & Development and welfare of works

The National

Government

Policy guidance, formulation of conducive laws and training on management skills,

enforcement of laws, dispensation of justice, conducting of elections, provision of

travel documents and certificates.

Tourists Promote investment in conservation of tourist attraction areas/sites

Transport Service

Providers

Provide public transport services to all stakeholders

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 149

Chapter Eleven

Development Programmes and Projects

11.1. Introduction

This chapter presents the projects and programmes that will be undertaken to realize the aspirations of the county. The analysis has been done in line with the

following MTEF sector working groups: Agriculture and Rural Development; General Economic, Commercial and Labor Affairs; Energy, Infrastructure and

ICT; Environmental Protection Water and Housing; Health; Education; Governance, Justice, Law and Order; Public Administration and International

Relations; and Social Protection Culture and Recreation. For each of the sector, the sector vision and mission is presented and the county‘s response to the

vision and mission is also discussed. The chapter also discusses the importance and role of stakeholders in each sector. The county priorities, constraints and

strategies are also discussed. The chapter contains a list of ongoing projects and programmes in each sector to be completed before the end of the plan period

to ensure sustainable growth and poverty reduction.

11.2. County Flagship Projects/Programmes

Table 47: Proposed Flagship Projects

Sector Project/Programme Name Sub-County Description of activities

General Economic Comprehensive Baseline

Survey, Resource Mapping

and CIDP Delivery

Environment

Countywide Resource and Baseline Surveys

Establishment of Environmental and Socio-economic monitoring system

Establishment of County Wide ICT Network

Establishment of Data Centres

Purchase of ICT Equipment and Development of Systems

Capacity Development

Land and Urban Establishment of Spatial Countywide Establishment of the Spatial Plan and a countywide GIS system

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 150

Sector Project/Programme Name Sub-County Description of activities

Development Infrastructure Upgrading the Survey System, Digitizing land recordsand Issuance of Land

Titles

Establishment of a Land Bank and reclamation of grabbed land

Development of Capacity in the sector

Water and Irrigation Oke Dam Baringo Central Dam already designed.

Construction of dam, treatment works, gravity pipelines, storage tank,

distribution pipelines and canals

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

1500 HHs and 2700 hectares under irrigation

Amaya Dam Tiati

1.4.2

Investigate, Plan and Design Dam

Construction of dam, treatment works, gravity pipelines, storage tank,

distribution pipelines and canals

Increase water storage and harvesting capacity;

2500 HHs and 2700 hectares under irrigation

Transport County Economic Roads

Tiati/

Baringo North/

Baringo Central

Eldama Ravine

Uasin Gishu + Elgeyo

Marakwet Counties

Timboroa- Seguton– Moringwo – Kapcholoi – Sigoro – Sirwa – Tenges-Ochii –

Mogorwo - Kapkayo – Kapkelelwa – Oinobmoi - Kinyach – Kolowa

(D364,R15,E1431,E333)

Mogotio- Baringo South Mogotio – Kipkitur – Kisanana – Waseges – Mochongoi

Baringo South + Laikipia

County

Karandi – Mochongoi – Marigat to join C51

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 151

Sector Project/Programme Name Sub-County Description of activities

Baringo South, Mogotio Kipkitur – Emsos – Majimoto – Loboi (D365)

Baringo South, Baringo

North

Kampi Samaki – Kipcherere – Kasisit - Kabartonjo – Kapkiamo – Barwessa

(D364)

Tiati, Baringo South,

Baringo North

Tourism Ring Roads: Loruk-Komolion-Rugus-Kiserian-Logumgum-Sandai-

Bogoria

National Security Roads Tiati, Baringo North +

Elgeyo Marakwet + Trans

Nzoia

Loruk – Lomuyek – Yatya – Chepkesim – Kapturo – Kalabata – Kinyach –

Arror – Kapsowar-To Kitale.(C77)

Tiati, Baringo North Kipsaraman – Bartabwa – Kapturo- Kositei - Chemolingot \

Tiati, Baringo South,

Laikipia County

Kiserian-Mukutani-Sosion-Kaptuya-Muge-Rumuruti

Mukutani-Ngelecha-Kinamba

Baringo South, Mogotio,

Laikipia County

Kiserian- Ramacha-Chemorongion-Nyimbei-Nyalilbuch-Waseges-Kiribot-

Kabuswa-Mbogoini

Tiati, Samburu, Turkana Nasorot-Maloso-Losuk

Geothermal Roads Tiati – Samburu Nadome-Nasorot-Akwichatis-Orus-Kokwototo-Tangulbei

Tiati Silale – Naudo-Nginyang

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 152

Sector Project/Programme Name Sub-County Description of activities

Tiati Kapedo-Barpelo-Ngoron

Tiati, Baringo North Chemolingot-Loiwat

Tiati Tangulbei-Kadokoi-Nginyang

Aviation Eldama Ravine Development of the Kabimoi FTC and Kimalel Airstrips to all weather standard

Baringo South

Health Upgrading of a Kabarnet Sub-

County Hospital to Level 5

Countywide Upgrading Kabarnet district hospital to level 5

Tourism Development of Kamnarok

Game Reserve

Baringo North Infrastructure improvement and reserve conservation

Education Establish 3 New Technical

Institutions in 3 sub counties

Baringo South Eldama

Ravine

Baringo North

Land acquisition

Construction of infrastructure

Equipping

Establish one Public

University

One university with

constituent colleges in

other sub-counties

Land acquisition

Construction of infrastructure

Collaboration with existing institutions

Establishment of libraries One in each sub-county

that does not have

Land acquisition

Construction of infrastructure

Equipping and Supply of Books

Industrial Establishment of an Industrial

Park / Corridor

Eldama Ravine

Mogotio Baringo South

Baringo North

Tiati

Land acquisition

Servicing and construction of industrial grade infrastructure

EPZ along Sabatia, Maji Mazuri, Timboroa, Nginyang

PPP Investments in

Agriculture, Livestock

and Fisheries

Establishment of Fish Value

Chain Facility

Baringo North Hatchery

Fish Processing Plant

Fish Feeds Factory

Development of Fish Farming

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 153

Sector Project/Programme Name Sub-County Description of activities

Centre of Excellence in

livestock production and meat

Processing

Baringo South Establishment of a facility including a veterinary investigation laboratory with

satellite labs in all other sub counties, a fattening ranch, a countywide livestock

registry, and a training centre.

Dairy Processing Plant Eldama Ravine Partnership Building

Establishment and Capitalization of Special Purpose Vehicle

Facility Design

Procurement

Construction

Operation

Potato Cold Storage Plant Eldama Ravine

Leather Development Centre Mogotio

Loruk and Barwessa

International Class

Slaughterhouse

Tiati / Baringo North

Fruit and Nut Processing Baringo Central (Kerio

Valley) and Baringo South

(Marigat)

Energy Establishment of the Baringo

Energy Corporation

Countywide Establishment and Capitalization of a county corporation to undertake Rural

Electrification and develop

Geothermal, Wind, Solar, Hydro Electric and Bioenergy Resources in the county

Youth Establishment of Youth

Empowerment Centres

1 in every subcounty Construct and Equip the Youth Centres

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 154

11.3. Agriculture and Rural Development

The Agricultural and Rural Development (ARD) Sector comprises of the following eight sub-

sectors: Agriculture; Livestock Development; Cooperative Development and Marketing;

Lands; Fisheries Development; Forestry and Wildlife; National Land Commission and

Agricultural Research & Development (ARD).

Vision:

A food secure, competitive and productive Baringo County.

Mission:

To improve livelihoods through promotion of competitive agriculture, innovative

research, growth of a viable cooperatives sub sector, and sustainable management of

land,forestry and wildlife resources.

County Response to Sector Vision and Mission

This is major sector in the county since 80 per cent of the population depends on agriculture

for their livelihood. Agricultural production however has been varying over the years

depending on the amount of rainfall received per year. The county will strive to increase crop

and livestock production so as to attain food security and provide marketing of farm and

livestock produce. In addition promotion of drought resistant crops and small scale irrigation

will be adopted.The cooperative development and marketing sub sector will also be

improved. Construction of honey refinery will be a priority in order to add value to the

locally produced honey. Farmers will be encouraged to form marketing societies for their

farm produce and livestock so as to reduce exploitation from middle men.

Role of stakeholders

Stakeholder Roles

Agriculture Department Provision of extension services to the farmers;Agricultural information

management;Provision of technical advice; Farm mechanization; Soil and water

conservation; Value addition of farm produce

Fisheries Department Fisheries extension services; Fish value addition

Veterinary Department Undertake Vaccination;Veterinary vector control and disease treatment;

Provision of clinical services for animals;Artificial Insemination (AI);

Veterinary public health; Hides and skins and leather technologyBranding

Livestock production Pasture and fodder development; Rangeland reseeding; Animal husbandry practices;

Livestock marketing; Value addition of livestock products

Co-operative Development Enforcement of the co-operatives society Act and promoting the growth and development

of the co-operative sub-sector;Organization of farmers association to secure loans from the

financial institutions;

Research Institutions Research on appropriate farming technologies;Research on viable crops and livestock

breeds;

NEMA Coordinate environment management issues; Promote the integration of environment

concerns into development plans; Monitoring and valuating activities that have an impact

on the environment;

ALRMP II Restocking, capacity building of local groups on farming.

SACCOS, Micro-finance

institutions ,Banks

Provision of credit facilities to farmers for improving their inputs;

Private Sector, NGOS,CBOS

and FBOS

Capacity building in participatory development;Financial support to development

projects;Environmental conservation ;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 155

On-going Projects and Programmes

(a) Flagship Projects: Agriculture, Livestock and Fisheries Development

Project Name Objectives Targets Description of Activities

1. Fish farming-Mogotio/

Eldama Ravine

Diversify income to the farmers All existing water pans and dams Stocking of water pans and dams with fish

2. Expansion of Fish Farming

county wide.

Promotion of fish farming as an

economic activity

50 new fish ponds per sub county

Stock 20 public dams in the county

every year

Provision of credit, Extension services and capacity building

to farmers

-County zoning

3. Potato cold storage facility Increase the shelf life of potatoes All potatoes growing areas within

Koibatek

Construction of cold storage facility

4.Disease control Creation of a disease-free zone

county wide

Livestock Vaccination Vaccination of livestock

Continuous disease surveys Disease surveillance and reporting, collection of samples for

disease diagnosis

Livestock movement control

Livestock route inspection;

Certification of livestock markets and sale yards;

Quarantine of disease outbreak areas;

5. Milk processing plant Increase value of milk, create wealth

and employment

Establish a milk processing plant in

Koibatek

Mobilize PPP investment in construction and

operationalization of a milk processing plant

6.Green houses and

demonstrations (horticulture)

To enhance horticultural production,

crop yield productivity and intensify

land under crop production

Install 150 green houses (5 per

ward)

Purchase green houses and irrigation kits

Train farmers on green house production technology

7.Veterinary Investigation

Laboratory

Intensify Disease surveillance 1 main lab and 5 satellite labs Setting up of VIL and 5 satellites and equipping of the same

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 156

(b) Other projects

Project Name

Location/ Sub-county/

Constituency

Objectives Targets Description of Activities

Water-harvesting for food

security projects.

To harvest rain water and

development of water storage

infrastructure for agricultural

production

10 Water-pans in the county Water-pan construction.

Farmers group use of the structure.

Subsidized fertilizer and other

farm inputs program

To improve on food security and

reduce poverty

30,000 farmers in the county Provision of fertilizer at an affordable price;

Promote establishment of Muchukwo KARI sub centre

Orphan crops development

programme

To avail high quality planting

material to farmers for seed

multiplication.

24 Farmers groups. Provision of planting materials;

Provision of production messages

Njaa Marufuku Kenya-

county wide

Provision of the initial capital to

increase farm productivity and

income;

To reduce extreme poverty and

hunger in the county

Covert 70% of CBOs, and other

groups;

Appraise at least

50 suitable community driven food

security initiatives;

Fund at least 25 groups per year;

10 monitoring visits conducted per

year;

40 field school sessions conducted

per year

Convene County Grant appraisal Committee; Sensitize

communities to prepare NMK proposals.

Monitor and evaluate NMK funded projects; Train groups

on management of the funded projects;

Conduct farmer field Schools;

Water harvesting for crop

production-ASAL

To improve food security;

To Mitigate against severe drought

and water shortage.

5000 farmers trained on water

harvesting;

300 extension officers trained on

water harvesting;

Establish 250 ha of crop under water

harvesting structures.

Train extension officers on water harvesting techniques.

Farmers trained on water harvesting for crop production

Cotton production-ASAL;

Salawa, Sacho, Kimose and

Tenges

To Increase area under production

and farm incomes

25,000 ha under cotton cultivation;

Increased value addition at farm

level

Stakeholders‘ mobilization;

farmer trainings;

Acquire farm input; Introduction of Micro-ginners and oil

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 157

Project Name

Location/ Sub-county/

Constituency

Objectives Targets Description of Activities

extraction technologies

Traditional high value crops

seed development-ASAL

To Improved food security;

To increase availability of seeds of

orphaned crops locally

1,250 Acres put under beans/

cowpeas seed bulking per year;

10,000 bulking farmers trained per

year

Train Farmer;

seed acquisition and multiplication;

disseminate research findings to farmers;

Inspection of bulking plots; Harvesting ;

storage and distribution of bulked seeds

Enhance Research-Extension-

Farmer Linkages

To improve flow of research

findings to farmers for improved

agricultural productivity;

Conduct 20 on farm trials yearly;

Conduct 1 research extension

meeting per year for every Sub

County;

4 field days conducted per year for

each Sub County.

Plan and conducted trials on farmers fields/

Train Extension officers on data collection

Traditional High Value Crop.

(THVC)

To increase availability of clean

planting material;

Improve food security

15.1 tones of traditional high value

crop be retrieved from farmers

issued

Provide traditional High Value seed crops to farmers

National accelerated

agricultural input access

programme. (NAAIAP)

To Increase technical knowhow of

smallholder farmers on efficient

utilization of farm inputs to increase

agricultural productivity.

Upscale linkage of farmers and agro

dealer to available market i.e. input

and output market

Improved access of credit of agro-

input dealers and farmers.

1000 small scale farmers to receive

one acre inputs to plant maize and

capacity building on efficient

utilization of farm inputs per sub

county per year;

1000 small scale farmers linked to

available inputs and output markets;

1000 small scale farmers sensitized

on available credit and where to

access;

60 agro dealers‘ capacity building on

efficient use of farm to increase

agricultural productivity and credit

access awareness.

Supply of inputs to farmers.

Train farmers on efficient utilization of farm inputs.

Agricultural Sector To upport the transformation of -Sector wide coordination improved -Support towards Agricultural sector coordination

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 158

Project Name

Location/ Sub-county/

Constituency

Objectives Targets Description of Activities

Development Support

Programme (ASDSP)

Kenya‘s agricultural sector into an

innovative, commercially oriented,

competitive and modern industry

that will contribute to equitable

productivity, poverty reduction and

improved food security in rural and

urban Kenya

2. To Increase equitable incomes,

employment and food security of

both male and female target groups

as a result of improved production

and productivity in the rural

smallholder farm and off-farm

sectors‖.

-Environmental resilience and social

inclusion of value chain actors

improved

-Support the development and

commercialization of 3 prioritized

value chain commodities across the

County, namely: Dairy, Honey and

meat goat (Chevon)

-Capacity building of key sector institutions and

institutionalization of the ASDSP at the national and county

levels

-Strengthening linkages between sector institutions

-Support establishment of M & E and information

management systems

-Support development of an enabling policy and regulatory

framework for the sector

ENVIRONMENTAL RESILIENCE & SOCIAL

INCLUSION COMPONENT

-Support theStrengthening of environmental resilience for

value chain actors, including vulnerable groups

-Support the strengthening of conditions that enable

vulnerable groups to engage in value chain development

Prioritized Value Chain Development Component

-Supportdevelopment and commercialization of prioritized

inclusive value chain commodities

-Enhance/Increase public and private investment in

prioritized value chain development

-Increase equitable access to markets of prioritized value

chains commodities

-Improve access to affordable financial and insurance

services for prioritized value chain actors

-Support Up scaling and out scaling innovative and

inclusive prioritized value chains and value chain

technologies

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 159

11.3.1. Livestock Production

On-going projects

Project Name

Location/ Sub-county/

Constituency

Objectives Targets Description of

Activities

Tsetse Control To reduce tsetse density and

incidences of Trypanasomiasis in

livestock

Reduce fly density by 20 per cent annually;

Reduce incidence of Trypanasomiasis in livestock by 20 per

cent annually.

Carry out tsetse and Trypanasomiasis

survey;

Deploy insecticide treated targets;

Use of Synthetic Pyrethroid charged dips;

Use of traps;

Training of community Tsetse control

committees.

Clinical Services To maintain healthy state of

livestock

Treatment of all reported sick cases in livestock;Ensure

compliance of private service providers.

Carry out treatment of sick livestock;

Supervision of private service providers

To improve animal health

management and production

To hold farmer trainings: 200 Demonstrations; 55 Field days;

Attend and Participate in the annual Agricultural show.

Train farmers through demonstrations, farm

visits, field days, shows

Hides and skins

improvement and leather

development

To improve quality of hides and

skins

To train all flayers at the slaughtering points; Train traders on

handling of hides and skins;Train producers on appropriate

management practices.

Train hides and skins producers, traders and

flayers

Tick control Control and reduce tick borne

disease incidences

Desilting of 15 cattle dips per Sub County;Carry out 288

training sessions and 970 per supervisory visits;Auditing and

recommending all dips for rehabilitation

Construction of new cattle dips and

rehabilitation of existing ones;Training of

dip committees on proper dip management;

AI Services Improve the coverage/quality of

AI services in the county

Creation of 15 more AI services centres per Sub County;

Licensing and inspection of the 10 AI services each year;Carry

out 40 training sessions for farmers, inseminators and service

providers

Establish AI service centers;revival of

stalled AI services;Training of inseminators,

service providers and farmers

Licensing/inspection of all AI offices and

stores

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 160

Project Name

Location/ Sub-county/

Constituency

Objectives Targets Description of

Activities

Honey production To increase Honey productio To increase honey production to 4,135314 kgs annually Increase honey productivity per hive to 11

kgs per hive and production to over 5,000

tonnes per year,

Purchase of modern beehives

Fodder Production To improve fodder production

and improve pasture

Increase fodder production,to

To increase area under improved pastures by 30% i.e 19,531ha

Capacity building communities,

Purchase of modern bailer machines

Improving pasture through research

11.3.2. Cooperative Development

Ongoing and Proposed New projects

Project Name Objectives Targets Description of Activities

Education and Training

programme

To Enable co-operative societies to organize

and run their affairs successfully

Co-operative

members;

staff of Co-operative

societies

Source for trainers;

Prepare terms of reference for trainers;

Prepare list of trainees;

Contract institute to do the training

Co-operative awareness

meetings

To Create co-operative awareness in the

county

Co-operative

members;

potential members;

the general public

Organize for the meetings;

Source venue;

Pay for services rendered.

Accounts and Management

meetings

Bring the bookkeeping and Accounting

standards up to date

Existing co-operative

societies in the county

Organize for the meetings;

Source venue;

Pay for services rendered.

Auditing of Co-operative

societies

To comply with the legal requirements All existing co-

operative societies in

the county

Prepare schedule of societies to be audited;

Prepare audit team;

Prepare budget for the exercise.

Market Information and To enable societies and value for agro-based All co-operatives To provide services which are competitive in the market and

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 161

Project Name Objectives Targets Description of Activities

Research societies; Identify other products for

SACCO societies; To network with other

stakeholders for identification of market

outlets.

societies earn more for their products and services for self sustainability;

Especially in coffee bee-keeping, cotton sector;

Other micro-finance services in the savings and credit sector to

assist the members and local community.

Ethics and Governance

Compliance

To have all co-operative committee and staff

comply with ethics Act.

Committee and staff

of co-operation

societies

To have leadership of integrity in the co-operating movement

Promotion of Co-operative

Ventures

To enable co-operatives exploit more

economic ventures

Existing co-operative

societies and new co-

operative societies

More areas of economic ventures have not been exploited fully

by co-operative members like the Jua Kali sector, livestock

marketing.

Coffee Development Fund

Credit Activity

Avail credit facilities to coffee farmers for

improvement of volume and quality of coffee

production in the next 4 years

Coffee farmers Coffee production in the county both in quality and volume is

still below the county‘s potential

Enhance compliance on non-

remittances by employers in

saccos

To ensure that employee deductions are

remitted timely, and in correct amounts to

Saccos by employers

Employers and sacco

society members

Sensitization of employers, Sacco management committees, and

members

Fill form VIB (r 31b), file the for regularly with the employer,

Monitoring and evaluation

Registration of new Co-

operative Societies at least 2 per

sub-county

To involve as many people as possible in Co-

operatives

youth and women and

county wide Saccos

Fill application for registration forms,

Prepare By-Laws,

Prepared economic appraisals and business plans

Submit the documents to the commissioner for Co-operative

Development for registration

Monitoring and evaluation

Revival of dormant Co-

operative Societies at least 2 per

sub county

To streamline governance in co-operatives

where members had lost faith in them

Members, youth,

women, and the

public

Organize for meetings with stakeholders, Identify venues,

Source for funds, Carry out revival meetings

Monitoring and evaluation

Capacity built for value addition

in the following value Chains

Dairy,honey, red meat, coffee,

To add value to products, ensure better

quality, access to local and regional markets,

and more incomes to co-operators

All 82active

marketing Co-

operative Societies

Indentify Co-operative Societies due for value addition,

Train management committee members, staff, source for funds,

Source for technical expertise for value addition,

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 162

Project Name Objectives Targets Description of Activities

cotton, horticulture,sacco

products, aloe

vera,fish,groundnuts

Minimize exploitation by middlemen and active Saccos

with emphasis on

women and youth

Procure plant, equipment and tools, install

Embark on value addition

Monitoring and evaluation

Provide information on sourcing

of farm inputs in bulk through

Kenya Farmers Co-operative

union Ltd. (KFCU)

To avail to farmers affordable inputs on time Co-operative

Societies‘ members

Co-operative Societies to list members inputs requirement,

Forward the requisition to, KFCU, Pay for inputs and receive

deliveries for onward distribution to members

monitoring and evaluation

Stalled projects

Project Name

Objectives Description of Activities

Co-oparative Trainings Education and training for Co-operative

Societies

Sourcing for fund for training, Identify training needs, Identify

trainers, carry out training

Capacity building for Coffee sector Continuation of implementation of Quality Coffee Production and

Commercialization Programme (QCPCP)

Revival of Cotton Co-operatives A survey was carried by Ministry of Co-operative Development and

Marketing HQs in November 2012

Audit fast tracking programme List of Societies having audit in areas, auditors to carry out Audit,

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 163

11.3.3. ProposedActivities (MTP Consultations) under agriculture sector

The MTP consultation process identified the following key priority areas, issues and

proposed interventions

Key Priority Areas

Agriculture productivity / Food Security; Promoting Market Access and Product

Development;

Enhancing Accessibility to Affordable farm inputs and credit; Promoting Sustainable Land

Use and Environmental Conservation; Enhancing Institutional Efficiency and Effectiveness

in Implementation and Improving Service Delivery

Key Issues

The County is food deficit; Poor farming Methods; Unpredictable weather resulting to

droughts;

Low productivity and low production acreages; High pre and post harvest commodity losses

due to Pests and diseases infestations ;Low adoption of appropriate technologies such as

high-yielding crop varieties and inadequate application of fertilizer due to High cost of the

farm inputs;Low adoption of emerging technologies ; Inadequate value addition (processing)

resulting toLow market prices and low marketability of products;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 164

Proposed Activities Indicators Outcomes

Proposed Interventions (Short Term)

Diversifying cropping base to crops like

Macadamia, coffee, ground nuts, aloe and

cotton;

Promoting drought tolerant crop

varieties;(Development and multiplication of

seeds);

Improving drought cycle management;

Training of farmers on low cost water

harvesting technologies and water application

systems(drip irrigation);Rehabilitating existing

irrigation infrastructure

Create market links for produce and products

from processing industries

Cross breed crops and livestock

Community sensitization on benefits of fish

farming

Proposed Interventions (Long Term)

Investing on the expansion of irrigation

infrastructures; Constructing multi-purpose

dams;

Develop and implement better post harvest

storage techniques;Promote large-scale

farming; Provide farm input subsidies;

Establish research centres;Establish disease

free zones for livestock

Number of modern post-harvest storage facilities;

Number of marketing Associations;

Number of new farming and land management

technologies introduced per year;

Number of farm extension officers and their ratio to the

number of farmers;

Acreage of land put under irrigated agriculture each

year;

Acreage of land under agro-forestry activities;

Number of acreage under irrigation;

% of food secure households;

Number of fish ponds constructed;

Number of modern farming methods established each

year

Number of fruits and vegetable extraction factories

established

Number of updated reports on market links each year

Amounts of input subsidies provided to farmers

Number of resistant livestock breeds introduced each

year

Number of sensitization sessions to farmers on the

importance of fish farming

Acreage of land under the cash crops;Volume of

production of cash crops;

Establish one Abattoir for beef Marigat;

Acreage of land under irrigation;

Amount of value added output from farm produce;

Tonnes of honey produced and sold;

Tonnes of meat, beef, mutton, wool and fat lamp

produced

Reduced post-harvest output storage losses;

Increased marketing links and turn-over

Optimum farming and land management techniques

Faster adoption of new farming technologies;

Increased acreage of land put under irrigated agriculture;

Increased agro-forestry activities;

Increased acreage under irrigation

Food secure households;

Increased fish production;

Modern farming methods adopted by farmers;

More market returns for farm inputs;

More market returns and high turnover of market produce;

Improved livestock breeds thus more productivity;

More farmers adopting fish farming;

Acreage of land under the cash crops;

Increased employment;

More land under irrigation;

Increased market returns;

Increase in Apiculture economic activities;

Increased returns from meat, beef, mutton, wool and fat lamp

produced;

Faster response to reported diseases;

Reduced livestock diseases;

Increased productivity from livestock;

Insurance schemes established;

Number of disease free zones established;

Increased water access ;

Acreage of land under grape fruit farming;

Increased employment activities;

Increased farm produce returns;

Easy access to seedlings

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 165

11.3.4. New Projects (CIDP Sub county Consultations)

The consultative process for the development of the CIDP identified the following projects and programmes

Project Name Objectives Targets Description of Activities

.Establishment of

the Credit

Development Fund

Easy access to affordable credit facilities

Small and medium enterprises, saccos, farmer

groups across the County

At least one entity per Ward Link entities to Credit Development Fund

Capacity building of beneficiary groups

100 million for fund to borrowed at 5% interest rate5

million for operations

Livestock

Upgrading Program

Improving quality, quantity and income from

livestock farming.

Milk production up by 50%, beef production up 50% ,

diversification of livestock products

-capacity building of farmers/ extension

-Provision of AI services

-Introduction of improved breeds

-Pasture and fodder development and conservation

-Provision of credit facilities

-Electronic branding of livestock.

-Up scaling and Set up of livestock multiplication centres

at strategic points across the County

- Water development for livestock use

Establishment of Bull Stations in strategic areas of the

county county like Kaptigit and Barwesa

Establishment of livestock improvement centres for

enforcing a disease free zones

Establishment of the Embryo Transfer Facility at Kabimoi

FTC

Establishment of goat improvement and breeding centres at

Chemogoch, Kimose and Mogotio

Cattle branding for

livestock

identification.

For easy of identification All cattle county wide Branding of cattle across the county

Fish feed

formulation at

Emining.

Promotion of fish farming value chain

development.

Construct a house and install a fish pelletizer machine at

Emining

- setting up pelletizer machine

- Capacity building

Construction/rehabil

itation of 90 cattle

dips.

Improving livestock health and disease

control.

90 cattle dips Repairs, Design, Construction, Equipping, Acaricide

provision, Staffing, operationalizing

BeeKeeping/Farmin Diversification of economic farming 30,000 beehives in the county -capacity building and standards training

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 166

Project Name Objectives Targets Description of Activities

g -provision of credit for bee hives and procession equipment

- Value addition and Branding of Honey

Irrigation Improved food security and employment

creation

5,000ha of land under irrigation in Baringo South, Tiati,

Baringo Central, Mogotio, Baringo North

Design, Construction, Capacity Building, Farm machines

purchase,

Provision of farm

inputs

Affordable access to farm inputs. One seed distribution depot per sub county -legal framework

-provide seed capital

-Credit provision to farmers

-Setting up seed storage depots

Coffee milling plant To promote branding of Baringo coffee,

wealth and employment creation

Put up a coffee milling plant and establishment of coffee

shops in Baringo North / central

raise acreage from the current 816 ha to 2,000 ha by

2018

Encourage PPP investment in coffee milling with local

shareholding.

Capacity building of farmers

Promote establishment of coffee nurseries for high yielding

varieties

Ground nuts

production and

processing

Increased wealth and employment creation

Improved household livelihoods

Promote increased production from 1,020 ha to 3,000 ha

in 5 years in Cheplembus, Kapkelelwa, Salawa,

Barwesa, Kinyach, Marigat, Kimalel/ Koriema, Sabor,

Emining, Kisanana, Mogotio, Kimngorom / Cheberen,

Kolowa, Chesirimion and Maji Moto

Reach 15,000 ground nuts farmers

Purchase ground nuts processing machines

Capacity building of staff and farmers

Conduct Demonstrations on production and processing

Enhance marketing linkages

.Macadamia nuts

production and

processing

-Establish a flourishing macadamia nuts

industry in the County

-Diversify household income sources

-Increase production, productivity and value

addition of macadamia nuts

-Enhance opportunities for wealth and

employment

-Establish a macadamia nursery

-Provide macadamia nuts value addition machines

-Capacity building of staff and farmer growers

- Raise acreage from the current 152 ha to 1,000 ha by

2018

-Set up a macadamia nuts nursery at Tenges

-Increase grafted macadamia nuts seedlings

-Establish a macadamia nuts processing machine at

Kabarnet

-Build capacity of staff and farmers to manage the

macadamia industry to prosperity

Cotton Ginnery

complex

Increased wealth and employment creation

Improved household livelihoods

Increase acreage to 25,000 ha by 2017

Capacity building of staff and farmers

Encourage PPP investment in establishing a cotton ginning

complex

Promotion of the

Cooperative

movement

Driving the economy using the Cooperatives 5 sectoral cooperatives in the County -Facilitate establishment of specialized Cooperatives

-Facilitate the revival of stalled cooperatives

-Enhanced legislation to guide cooperatives

-provision of Credit for capitalising Cooperatives

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 167

Project Name Objectives Targets Description of Activities

Construction of

Livestock Sales

Yards

To promote market access for livestock

products

19 Sites: Marigat, Kolowa, Salawa, Kinyach, Kaptara,

Kasitet, Amaya, Tangulbei, Kapcholoi, Emining,

Kibotany, Kabel, Tugumoi, Loruk, Maji Moto,

Kimoriot, Kapindazim, Kasitet, Kipsaraman, Kiserian,

Loitip, Barwessa, Nginyang, Chemogoch, Kipcherere

Securing Public LandConstruction/Rehabilitation of Sales

Yards

Establishing livestock Registry

Construction of

international

slaughter houses.

Barwesa, Loruk, Mumberes 3 International slaughter houses Construction of slaughter houses under PPP framework

Construction of biogas plants

Construction and

Rehabilitation of

slaughter houses

Countywide (at least 1 in every ward) 46 slaughter houses Carry out rehabilitation works

Range reseeding and

development

Increase livestock feed availability All ASAL areas in the County Capacity building

Range reseeding

Promotion of sisal

production

-Establish a flourishing sisal industry in the

County

--Increase production, productivity and value

addition of sisal

-Enhance opportunities for wealth and

employment

-Raise acreage from the current 400 ha to 1,000 ha by

2018

- Target areas include Kapkechui, Simotwe, Oterit and

Molosirwe locations as well as Chemogoch sub location

- Capacity building of farmers on modern sisal production

technologies.

- Formation of a sisal farmers society

- Procurement of a mobile sisal decorticating machine

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 168

11.3.5. Strategies to Mainstream Cross-cutting Issues

Gender issues will be addressed in all the sub-sectors by ensuring that the gender

balance is observed and both men and women are given equal opportunity. There will

be emphasis to achieve the 30 per cent women representation in all trainings and

activities, including the committees charged with different responsibilities under the

devolved funds as well as appointive positions.

The HIV and AIDS affect all the sub sectors negatively especially the agriculture

where the productive age is mostly affected and efforts will be made to mainstream

HIV and AIDS in the sector activities. The projects proposed in this CDP have also

taken into account the environment and climate issues. They will also be implemented

in a sustainable manner with appropriate environmental impact assessment being done

to minimize any negative impact.

ICT will play an important role in this sector in provision of agricultural information

to farmers. The use of technologies such as M-SHAMBA, a mobile-phone enabled

technology which will help farmers to link up with crop researchers, meteorological

departments and veterinary scientists to improve their farms yields will be explored

and be fully exploited in the county.

11.4. Education Sector

The Education Sector comprises of Ministry of Education (MOE); Ministry of Higher

Education, Science and Technology (MoHEST); the Teachers Service Commission (TSC)

and their affiliated Institutions.

Vision

A globally competitive education training, research and innovation for sustainable

development.

Mission

To provide, promote and coordinate quality education and training, integration of

science, technology and innovation in sustainable socio-economic development

process.

County Response to Sector Vision and Mission

To achieve the sector vision and mission, education and training will focus on

community involvement and participation in education programmes. Promotion of

Girl Child Education (GCE) and Early Childhood Development (ECD) programmes

will be a priority in the county. Improvement of education facilities through increase

in bursary and community contribution, promotion of a sustainable school feeding

programme will also be a priority in the county. Mobile schools and boarding schools

for pastoral communities will also be a priority. There will also be rehabilitation and

equipping of youth polytechnics as centers of specialization. The county will also

prioritize equipping of secondary schools with IT and Laboratory facilities.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 169

Role of the Staakeholders

Stakeholder Role

Community Participate in M & E activities

National Government Ensure formulation and Implementation of

policies and to provide funds

Quality Assurance Standards

County Government Provide land for physical infrastructure

Provide funds for development

CBOs/NGOs/Donors Provision of physical facilities and bursaries to

bright but needy children.

Train community on the rights of children.

Private Sector Complement Provision of education services and

support programmes at all levels.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 170

Ongoing projects: Education

Flagship projects: Education

Project Name Objectives Targets Description of Activities. Responsible agency Implementation status

Centre‘s of excellence To increase the number of

classrooms and improve

infrastructural facilities to create

conducive environment for

learners

10 secondary schools

10 primary schools

Renovation & construction of

dining hall, laboratory,

classrooms and

administrations blocks in the

schools.

MOE On going

Computerization of Sec. Schools Improve performance through e-

learning

30 secondary schools Purchase of computers,

projectors and installation of

internet.

MOE Ongoing

11.4.1. New project proposals

Project Name Priority Ranking Objectives Targets Description of activities

Refurbishment of ECDE Centres in

primary schools within Baringo County

1 Enhance access to ECD

education to all children in

Baringo County

360 ECD Classrooms -Construction of 3 classrooms per school

-Equipping

-Employment of 3 ECD teachers per primary school.

- Renovation as appropriate

Construction of 4 new ECD Centres per

sub county

2 Enhance access to ECD

education to all children in

Baringo County

24 ECD Classrooms Design, Construction, Equipping of classrooms and

Recruitment of Teachers

Construction of 3 new youth

polytechnics at Tiati, Baringo North and

Baringo South and rehabilitation of 12

existing polytechnics

3 Enhance access to

technical/vocational education

to all youth in Baringo County

3 new youth Polytechnics

15 adequately refurbished

and equipped polytechnics

Design, Construction, Equipping of workshops and

Recruitment of Tutors

Establishment of one Integrated Special

school per sub county/Constituency

5 Enhancement of integrated

access to education by Children

with disability

6 Integrated schools Design, Construction /Completion, Equipping and

operationalization of 6 Integrated schools.

Setting up a County Bursary,

Scholarship and Startup Fund for Post

Secondary Education

6 Increase access to education by

all needy and deserving

children in Baringo County.

Resource Mobilisation, Set up Legal Framework,

Establishment of Secretariat and Operationalisation of

program.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 171

Project Name Priority Ranking Objectives Targets Description of activities

Construction of all incomplete schools

as reflected in Annex of projects.

9 Enhance access , retention and

transition to Secondary

education to all children in

Baringo County

Incomplete schools Resource Mobilisation,Design, Construction, Equipping

Establishment/Construction of Baringo

ECDE college

10 Enhancement of quality training

of all new ECDE teachers in

Baringo

One ECDE college. Resource mobilisation , Design, Construction , Equipping,

operationalising.

Establishment of one adult

education/home craft centre per

location in Baringo County.

11 Enhancement of Access to

Adult Education In Baringo

County

90 Adult Education Centres Resource mobilization , Design, Construction , Equipping,

operationalising

Proposed Secondary Schools

S/NO SCHOOL AREA OF DISABILITY LEVEL SUB-COUNTY

1 Marigat Day Visually impaired [mixed] Secondary Marigat

2 Esageri Hearing impaired [mixed] Secondary Mogotio

3 Kabarnet deaf/blind All categories Primary Baringo Central

4 St. Patricks Shimoni Physically handicapped Secondary Koibatek

Proposed Programmes [Primary]

S/NO SCHOOL AREA OF DISABILITY LEVEL SUB-COUNTY

1 Pemwai Mentally handicapped Primary Baringo central

2 ochii Hearing impaired Primary Baringo central

3 Chemolingot All disabilities Primary East Pokot

4 Moi Kabartonjo Visually impaired Primary Baringo North

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 172

11.4.2. Proposed Programmes

Project Name:

Division/Location/

Constituency

Objectives Targets Description of Activities

Improvement in enrollment,

retention and transition rate

County Wide

To make a deliberate move to ensure

education is achievable to all through day

schools and low cost boarding schools

Improve the present

enrolment retention rate to

98% and improve transition

rate by 70% at all levels

Promote school feeding programmes;

Build more day secondary school and low cost boarding

primary schools.

Establish nomadic boarding primary schools in Tiaty

Dropout rate reduction programmes

County Wide

The school dropout should be contained

and improve transition and completion

rate at all levels

Reduce all drop-out rates by

100% by 2017

Strengthen guiding and counseling in schools;

Charge reasonable fees especially for schools that were

already well established;

Provide bursaries;

Equip schools with required learning material;

Enhance assessment in schools.

Construction of early childhood

development centres classrooms

County Wide

Enhanced enrolment in ECDC Construct 360 classrooms by

2015

Sensitization of school communities;

Mobilization of resources;

Construction of classrooms in primary schools.

Construction of Libraries in

selected schools

County Wide

Improve hygiene and academic

performance in schools.

Construct libraries in 10

secondary schools and 5

primary schools

Sensitization of school communities on the importance

of libraries;

Mobilization of resources

Construction and equipping.

Monitoring and Evaluation to

improve quality in schools,

polytechnics and other tertiary

institutions

Ensure quality training in the institutions Monitoring of 100% of all

institutions at least once per

year

Introduction of performance contracting

Guidance and Counselling To ensure psychosocial support and

proper adjustment of pupils, students and

staff

100% Coverage at all

institutions

Strengthening of existing guidance and counseling units

and establishment of new ones where none exist

Provision of training and capacity building for

counselors

Auditing of Schools To ensure accountability, transparency At least once per year in Auditing of schools

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 173

and prudence in the use of public

resources

every institution

ECD Capacity Development

Programme

To establish adequate capacity to provide

ECD services to the people

1 ECD Training Centre

360 ECD Teachers

Establishment of 1 ECD Training Centre

Recruitment and Training of ECD Teachers

Post Secondary Capacity

Development Programme

To develop the capacity of instructors

/teachers on ICT, life skills, guidance and

counseling, entrepreneurship , and

disaster management

50 instructors

1500 teachers

Preparation of Training Materials

Training of Instructors and Teachers

Exchange and Benchmarking

Programme

To facilitate the exchange of ideas and

transfer of best practices

5 in county, 5 national and 3

International Exchange

Programmes

Visiting other institutions within and outside the county

and country

Hosting and sending students and instructors in exchange

programmes

Career Fair To guide and mentor the youth in making

career choices

3 per year Inviting Mentors

Hosting the fair

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 174

11.4.3. Strategies to mainstream cross-cutting issues

There will be concerted efforts to address the girl child problems to improve girl‘s enrolment

and completion rates. The participation of women in strategic committees like the devolved

Fund will ensure the plight of girl child is addressed. The introduction of free primary

education and subsidized secondary education has seen rise in enrolment rate.

11.5. Energy Infrastructure and ICT Sector

The Energy, Infrastructure and Information Communications Technology Sector consist

of Energy; Roads; Public Works; Transport; Local Government; Nairobi Metropolitan

Development and Information and Communications Technology Subsectors.

Vision

A World class provider of cost-effective physical and ICT infrastructure facilities and

services.

Mission

To provide efficient, affordable and reliable infrastructure for sustainable economic

growth and development through construction, modernization, rehabilitation and

effective management of all infrastructure facilities.

County Response to Sector Vision and Mission

Poor physical infrastructure has been identified as a major setback in development in

the county and hence the overall strategy is to provide physical infrastructural facilities

through rehabilitation, improvement and effective management and expansion of the

existing facilities. The road network will be maintained and improved through

gravelling, grading and upgrading to bitumen standard. Power and telephone services,

will be expanded to cover all the Sub-Counties targeting market centers, institutions

and main community projects.

Role of Stakeholders Stakeholder Role

Government

Departments

Provision of funds for maintenance of roads;

Solicit for funds from donors for road works;

Maintenance of classified roads to all weather roads;

Ensure that construction works in the county are of good quality, provide plans and

supervision for public projects;

Telkom

Kenya/Safaricom/Ai

rtel/Yu

Maintain the existing fixed telephone lines and extend telephone services to new consumers

Energy Sub Sector

The Sub-sector is responsible for transport policy formulation and development of regulatory

framework and transport infrastructure

Local Government

Sub Sector

The ministry‘s main focus is to ensure Operationalization of policy, institutional and legal

framework within the local Authorities to enhance service delivery .

Housing Sub-Sector facilitates development and management of quality and affordable housing for Kenyans

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 175

11.5.1. Projects and Programme Priorities

On- going Project/Programmes: Roads

Project Name

Objectives Agent Description of activities

Loruk-Chemolingot-Barpelo Improve access and ease transport KENHA Upgrading to Bitumen

Churo-Tangulbei-Loruk International Linkage LAPPSET Highway

Mogotio-Mugurin-Emsos-Lake Bogoria Hot

Springs

To ease and improve road transport. KERRA Graveling

Ravine –Eldoret Road Improve accessibility. KENHA Potholes patching

Eldoret-Iten-Kabarnet-Marigat To ease and improve road transport. KENHA Potholes patching AND Bush Clearing

Marigat - Loruk Improve access to rural areas. KENHA Bush Clearing and Drainage Works

Church Road Improve rural accessibility. KUDD Street Lights, Drainage Works and Paving

To ease and improve road transport. Gabion Installation

Society-Saos-Cheberen-Tenges-Kapsoo-Kasoiyo Improve access to rural areas. KERRA Repatching and Drainage Works

New Projects (MTP 2 Consultations)

The MTP consultations identified the following key issues and proposed the interventions below

Key Issue Proposed interventions

Indicators Outcomes

Poor transport, communications

and energy infrastructure;

Inaccessibility of most areas due

tom poor roads;

Low incomes from farming due

to poor for input accessibility and

output deliveries

Increase the matching grant approach to

electricity with the Rural Electrification

Authority (REA);

Increase the length of all-weather roads

Initiate alternative sources of energy such as

biogas, solar and wind energy sources;

Length of road tarmacked and murramed;

Percentage of households with access to

electricity;

Number of alternative sources of energy

initiated and sustained;

Amount of funds set aside by donors and

implementers as matching grants for

Improved roads accessibility;

Improved access to electricity

connections;

Enhanced alternative sources of

energy initiated and sustained;

Less destructions of forests for wood

fuel

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 176

Key Issue Proposed interventions

Indicators Outcomes

Increase the length of tarmacked roads electricity connections

Untapped natural resources;

water, solar, wind, geothermal,

minerals (diadomite, Ruby, sand,

hardcore, bushstones

Undertake feasibility studies to ascertain

economic value of identified resources

Exploit water falls for electricity generation;

Tap geothermal energy at Silale

An electricity generation project initiated;

Amount of minerals mined;

Value of minerals mined;

One geothermal energy project established

at Silale

Improved electricity access by

residents;

Enhanced economic diversification

Proposed Projects (CIDP Consultations)

Project Name Objectives Target Description of activities

Improvement of Urban Roads Improve quality of life in urban areas 50 km Design and construct urban roads

Acquisition of Construction

Equipment

Reduce the cost of infrastructure development Dozers, excavators

graders and others

Acquisition of Equipment

Development of utilization schedule and rules

Recruitment and training of technical staff

Mapping and maintenance of

transport information

Improve collection and preservation of road

information including road reserves

All Infrastructure Acquisition of mapping equipment

Recruitment and training of technical staff

Capacity Development on

Road Construction

To empower members of the community to

participate in road construction and maintenance

All Wards Training of members of the community on labour based

road construction methods

Development of County

Transport Policy

To provide a conducive environment for the

development of the local transport sector

Development of policy on road reserves, traffic

management, motorised transport (matatu, tuktuk, boda-

boda) and non-motorized transport (bikes, footpaths) and

street lighting

Development of Transport

Terminus in different urban

areas

To provide adequate facilities for transport operators

to offer their services and for the county to obtain

revenue

All Towns Development of Matatu Termini

Development of Railway

Linkage between the southern

corridor and LAPPSET

To improve connectivity within the region Nakuru-Nginyang Resource Mobilization

Design and Construction

Maintenance and Development

of Aviation Facilities

To improve air transport All airstrips in the

county

Fencing and securing

Repairs and construction of runways and Equiping

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 177

Project Name Objectives Target Description of activities

ICT

Optic Fibre Connectivity To enable connectivity and knowledge sharing Connectivity at every

subcounty

Work with partners to connect optic fibre to all sub-

county offices, schools, health centres and ICT centres

Establishment of the County

Data Centre

To enable delivery of public services through ICT 1 data centre Identification, procurement and/or Refurbishment of

Premises

Acquisition of Equipment

Capacity Development

Provision of WIFI

Connectivity

To enable connectivity and knowledge sharing WIFI coverage in every

urban area

Identification of Partners

Facilitation of the process

Establishment of E-

government Services

To realize an efficient and effective delivery of

services in all departments to the public

Number of services

available

Availability of county

paybill number

Needs Assessment

Systems Development and Deployment

Capacity Development

Enable payment of public services through mobile

money services

Establishment of ICT Centres

& Incubation Centres

To provide a conducive environment for ICT

businesses to thrive

Identification, procurement and/or refurbishment of

premises

Promotion and support for

locally developed ICT

solutions

To encourage the development of the local ICT

industry

1 incubator per

subcounty

Organize exhibitions to showcase local ICT products

Procurement of local ICT solutions

ENERGY

Accelerate Rural

Electrification

To increase the penetration of the electricity grid All Wards fast track implementation of the rural electrification

master plan to connect all public facilities by 2015.

Eliminate use of kerosene for

lighting

To promote clean lighting, preserve household

income, reduce indoor air pollution, and improve

education among the households of Baringo

All Wards Develop a household energy policy

Support penetration of solar lighting

Support the development of an

improved cookstove industry

To develop the household energy sector as a

strategic competency in Baringo County

Capture at least 30% of

the national household

and institutional

cooking fuel and stove

market

Forge partnerships for technology transfer

Encourage local manufacture of improved cookstoves

for distribution countrywide

Encourage development of pellets and briquetting

industry using invasive species

Support the development of To develop the use of alternative fuels 100 biogas technicians Training of biogas masons

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 178

Project Name Objectives Target Description of activities

biogas among farmers and

slaughterhouses

trained Educating farmers on the technology

Construction of biogas plants at all slaughter houses

Increase use of renewable

energy e.g. solar and energy

saving devices (e.g. bulbs) in

public facilities

To promote the use of renewable energy All Public Institutions Replacement of inefficient bulbs with energy saving

bulbs

Use of solar in street lighting, water pumping and remote

facilities where practical

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 179

Proposed Roads Projects

Figure 18 below shows the roads that will need to be constructed / upgraded within the

county. The legend explains the classification. The county prioritized will be constructed

based on the construction. More details will be included in this map when the transport sector

plan has been prepared.

Figure 22: County Flagship, Geothermal and Security Roads

11.5.2. Strategies to Mainstream Cross-cutting Issues

Care will be taken to minimize degradation of the environment while constructing physical

infrastructure. Before implementation, projects/programme will be subjected to EMCA of

submitting Environmental audits. The county will address issues of HIV/AIDS by requiring

all actors to sensitise their workers on prevention and care.

In the process of developing and maintaining the necessary infrastructure, the county will

take due cognizance of the MDGs.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 180

11.6. Environmental Protection Water and Housing Sector

The sector comprises of the following sub-sectors: Environment, water and irrigation and

housing and related research and development.

Vision

Ensure a clean and secure environment, sustainably managed mineral resources,

irrigation development, access to clean and affordable water and sanitation for all.

Mission

To promote conservation and protection of the environment, in order to support

exploitation of mineral resources, integrated water resource management for enhanced

water availability and accessibility as well as quality sanitation for national

development.

County Response to Sector Vision and Mission

In the medium term, the residents will be able to access safe drinking water within a

reasonable distance, while the sanitation facilities like sewerage will be constructed to

cover the major market centre while encouraging the construction of residential areas

outside the main town.

Role of Stakeholders in the Sector

Stakeholders Role

Government

departments

Provision of funds

Solicit for funds from donors

Supervision for public projects

Water board Maintain and operate major water projects, and extend water to new consumers.

County

Government

Provision of funds

Undertaking physical planning to ease the establishment of facilities

Formulation of bylaws for sustainable and safe use of the facilities

Local community Provision of required labour in the project areas

Provision of security to road furniture by avoiding vandalism

NEMA Coordinating environment management issues, promoting the integration of environment

concerns into development plans, monitoring and evaluating activities that have an impact

on the environment

NGOs/CBOs Facilitating the implementation of water, agriculture and environmental activities in their of

jurisdiction

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 181

11.6.1. Project and Programme Priorities

Flagship Projects

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Chemususu Dam Inadequate water services in

E/Ravine town and its

environs

Construction of Dam is ongoing.

Plan and design treatment works and

distribution mains

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

To serve over 15,000 HHs

Ground Catchment Rainwater

Harvesting structures

Runoff causing flooding in

the downstream areas

Investigate, plan, design and construct

a series of ground catchments to

conserve runoff from Kelelwa to

Loboi and create economic usage

Residents downstream each structure benefit from the

conserved water

11.6.2. New Proposals (MTP Consultations)

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Construction of Water

Supplies (Rehabilitation and

Expansion)

Inadequate water services caused by

dilapidated infrastructure

Carry out rehabilitation and expansion of

existing water supplies including metering

Improve water services of existing water supplies

Ground Water

DevelopmentProgramme

(Baringo County wide

Project)

Inadequate water services coverage.

Enhance drought resilience in worst

affected areas

Site, drill and equip at least 60 boreholes

during the plan period

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Over 5,000 HHs covered in the plan period

Pan/Small Dam

Construction (Baringo

County wide Project)

Inadequate water services coverage

for livestock. Enhance drought

resilience in worst affected areas

Investigate, Plan, Design and Construct at

least 60 water pans and 20 small dams

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Over 36,000 Livestock and 2,000 HHs covered in the

plan period

Rain water Harvesting Provide water to institutions to Construct/Procure water harvesting facilities Provide access to water and sanitation to 350

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 182

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

(Roof Catchment to

Institution)

improve learning conditions in the

County

institutions

Expanded National

Irrigation Programme

Develop Irrigation infrastructure in

line with National Irrigation Policy

Investigate, Plan, design and construct

irrigation facilities

Increase area under irrigation to improve resilience

through development of 20 schemes (6,400 Ha)

Baringo Irrigation

Development Programme

Identify new potential and develop Feasibility studies, Plan, design and construct

new schemes

Irrigated 1,000 Ha of agricultural potential

Establishment of a county

water provision facility

Inadequate water delivery services Establish a water company to supply water

within the county

Improved water governance and support infrastructure

rehabilitation

Development of Sanitation

and Sewerage Facilities

To improve sanitation in the county Establish sanitation facilities in all urban and

rural areas

Reduced water borne diseases, clean environment

Kapcheluguny Flood Water

Harvesting

Develop model drip irrigation

infrastructure to utilize flood water

harvesting

Design, construct/expand Kapcheluguny pans

to serve community greenhouses

Irrigate 25 acres using drip system

Kirandich Dam Phase 2 Inadequate pipe supply system and

coverage to match the dam capacity

Replace the current pipe system in Kabarnet

Town. Construct pipelines, tanks and pump

stations to cover the area between Kabartonjo

and Timboiywo.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

30,000 HHs will be reached by 2017

Kabarnet Town Sewerage

Plant

Lack of wastewater disposal system

in the town

Construct sewer lines and Treatment Works Increase access to sanitation in urban areas.

10,000 HHs will be connected to sewer system

Ndabibi water supply Dialpitated and inadequate

infrastructure

Improve and expand existing to cover more

HHs and improve service delivery

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

80 HHs and their livestock served by 2015

Kollowa Water Supply Poor access to piped water Improve and expand existing system to cover

more consumers

Improved access to safe drinking water in the market

centre

Kimao/Koriema-Patkawanin Make use of the completed Kimao

dam to serve intended purpose

Construct full treatment works and pump

station.

Construct 150m3 tank, rising main and

distribution lines.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

120 HHs to be served

Perkerra Water Project,

Ravine Division

Poor access to piped water Construction of 1No. 250m3 masonry tank,

gravity mains and distribution mains to cover

Toniok, Kipkoriony and Samutek villages.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 183

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Increase the water coverage to the consumers.

Kabartonjo Water Supply Old pipelines that require upgrading/

expansion, No sewerage system

Expansion/Extension of service lines, Survey

& design sewerage system

Increase water coverage by serving 2000 additional

people & improve sanitation

Increase water storage and harvesting capacity

SDA-Oro Bh Water Supply Inadequate piping system Extension/Expansion of service lines to reach

more HHs

Increase water coverage to Chemeril and its environs

Radat water supply Inadequate water services and

coverage

Improve the intake arrangement, construct

additional tanks and distribution system

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Improve access to safe water in rural areas;

Increase water storage and harvesting capacity

Serve 1200 people and livestock

Kaimoi Water project

Ravine Division

Limited access to piped water Construct intake. Lay gravity mains

distribution pipelines and construct

2no.100m3 Masonry tank.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase water coverage to over 3,000 people

Sacho Soi Water Project

Sacho Division

Slow pace of implementation due to

low funding levels

Construct 250 m3 tank, complete gravity

main and distribution pipelines

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

400 HHs will be served by 2016

Tirngwongwonin water

project

Inadequate water services coverage Laying of main and distribution lines.

Construction of 150m3masonry tank.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

2,500 people will be served

Tot-Kolowa Irrigation

project

Kolowa division

Ongoing (Redcross) Gravity water supply from Embobut river to

serve Marakwet and Pokot

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

200 acres will be under irrigation by 2015.

Yeptos Good water source with insufficient

service lines

Extension of pipelines Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 184

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Increase water coverage to serve 2,500 people

Cheberen water supply Improve existing scheme to serve

more people

Rehabilitate and extend the existing water

services

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

1,200 people and livestock

Chesirimion dam

Mondi division

Ongoing (Redcross) Multipurpose dam – for human livestock and

irrigation water demand

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

500 acres under irrigation each from Marakwet and

Pokot by 2015

Mumberes Water Supply

Project

Ongoing Construction of water supply: rising main,

tanks and distribution system

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

3000 HHs to be served

Kabindaram Water Project Ongoing Construction of intake, laying of gravity and

distribution mains and tanks

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

4000 HHs to be served

Chemorongion borehole Inadequate coverage Extension of distribution lines.

Construction of two number water kiosks.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

1500 people to be served

Endao-Loberer/Kampi Ya

samaki

Investigate, site and drill 3 boreholes to

augment existing boreholes Costruct

150m3 masonry tanks and facilities

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

To serve more than 5,000 people

Kapchepkor Silted Weir – source, insufficient

water source

Intake de-silting/rehabilitation, alternative

source

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase water coverage to serve 1,500 people

Ngenyilel water project

Mochongoi Division

Insufficient water coverage due to

low funding

Construct pump house; install pumpset,

rising main and distribution.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 185

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Construct 150m3 tank. Increase water storage and harvesting capacity;

Serve 2,500 people and livestock

Tirimionin Insufficient water coverage Embo-Ruto rising main

Hooking of power & Electric pump-set

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase water coverage to serve 1,000 people

Ol-Arabal/Chelaba Utilize existing water scheme Rehabilitation and extension of distribution

and rising mains.

Rehabilitation of three number masonry

tanks.

Hooking electricity mains to Kiserian and

chelaba pumping stations.

Improve access to safe water in rural areas.

Increase access to sanitation in rural areas.

Increase water storage and harvesting capacity

12,300 people will be served adequately

Bartolimo Insufficient pipelines Pipeline extensions Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase water coverage to serve 1,600 people

Desilting of water pans

Baringo County

Diminishing access for livestock

watering facilities due to siltation

Desilt at least 2 water pans per year in each

of the 6 sub-counties

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increased access to human and livestock water by

2017.

Rehabilitation of boreholes

Baringo County

Ensure all boreholes are working to

increase drought resilience

Rehabilitate/improve and expand at leased 10

boreholes per year in the County

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increased access to safe water by 20per centper cent in

2015.

Kipcherere Good water source with insufficient

service lines

Extension of pipelines Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase water coverage to serve 2,500 people

Kapkong Water Supply,

Sacho Division

Dilapidated infrastructure Rehabilitate 2 No. leaking tanks; construct

sedimentation and coagulation basins,

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 186

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Replace 6 No. High Head pump sets and

general refurbishment of structures

Increase water storage and harvesting capacity;

Increase the amount of water reaching the consumers.

Seretunin Water Supply

Kabarnet Division

Limited access to piped water Construct silt trap and 2nd intake. Lay

additional distribution pipelines

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase/activate the number of consumer connections

from the current 140 to 300 by 2017

Mochongoi Water supply

Ravine Division

Limited access to piped water Construction of 1No. 100m3 masonry tank,

rising mains and distribution network to

cover 6km.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

The project requires to supply 100 HHs.

Oinoptich Water Supply

Esageri Division

Poor accessibility to piped water Replacing of 1"Ø to 2"Ø G.I.gravity mains

and construct 100 m3 tank and lay

distribution pipelines

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase access to supply to 150 HHs

Kemtilil Water Supply

Ravine Division

Low water yield Moving the intake upstream 7km to increase

yield requirements more 6"Ø pipes and new

intake construction.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Increase access to piped water

Kiplombe Kaplesir Water

Supply

Esageri Division

Poor accessibility to piped water Procure various sizes of pipes to cover 8km

(Orinie, Muserechi, Kiplombe, Mandina and

Chemelil.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Increase water coverage

Kipsaraman water project To serve fast growing Divisional

HQ, Kipsaraman

Raising main and distributions pipelines

Tank Construction

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Increase water coverage to serve 1,800 people

Kapkokwon water project Limited access to piped water Install water meters, chlorine doser, lay

distribution lines to serve the comunity

Increase/activate the number of consumer connections

Pemwai Water supply

Kabarnet Division

Limited access to piped water Install water meters, chlorine doser, lay

distribution lines to serve sumeiyon

Increase/activate the number of consumer connections

from the current 25 to 300 by 2015

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 187

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Kipkaech Water Supply

Kabarnet Division

Limited Source yield and coverage

of supply

Install new mains driven submersible

pumpset, hooking of electricity, lay rising

main and construct 100 m3 tank and lay

distribution pipelines

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Increase access to supply to 250 HHs

Bartabwa Dam Poor quality of water from the dam Construction of treatment works & Pipeline

extensions

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Improve water quality and increase water coverage

Talai Water Supply

Kabarnet Division

Limited Source yield and coverage

of supply

Install new mains driven submersible

pumpset, hooking of electricity, lay rising

main and construct 100 m3 tank and lay

distribution pipelines

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Increase access to 180 HHs

Tenges Water Supply

Tenges Division

Limited coverage caused by design

horizon

Rehab pipelines, metering, replace old

pumpsets and drill new borehole

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

TimboroaWater Supply

Mumberes Division

Inadequate water coverage Procure, lay raising main and distribution

lines of sizes 8" ,5",4",3" and 2" GI and PVC

totaling to 18 kms

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

1870HHs will be served by 2016

Kasskwanet Dam (Kiboino)

Salawa Division

Limited access to water supply and

lack of water for irrigation

Dam already designed.

Construction of dam, treatment works,

gravity pipelines, storage tank, distribution

pipelines and canals

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

1500 HHs and1700 hectares under irrigation

Kapterit water Project Limited water services for domestic

use

Survey and design complete.

Awaiting funding

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

1200 HHs will be served

ERAWASCO

Inadequate pipe supply system,

Metering, lab equipment & water

billing system.

Replace the current pipe system in Ravine

Town. Construct extension pipelines, tanks

and install more service metres. Construction

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity ;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 188

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

of Phase 2 treatment works.

21,000 HHs will be reached by 2017.

Eldama Ravine Sewerage

Works

Lack of waste water disposal system

in the town

Construct sewer system and Treatment

Works

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

8,000 HHs will be connected to sewer system

Olerai springs water project Inadequate water coverage Construct intake weir, gravity main,

distribution system and 150m3 balancing

tank.

Improve access to safe water in rural areas

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

1,200 people

Chemolingot water supply Inadequate water supply to the

growing town

Drill and equip 3rd borehole, pipeline

extensions

Improve access to safe water in rural areas.

Increase access to sanitation in rural areas.

Increase water storage and harvesting capacity

200 HHs will be reached by 2017

Marigat Sewerage Works Lack of wastewater disposal system

in the town

Construct sewerage systems Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

100 HHs will be connected to sewer system

Marigat water supply Inadequate water services for the

growing town

Investigate, site, drill and equipping of 4 No.

boreholes and lay rising mains and

distribution lines.

Expand treatment works and provide

wastewater disposal system

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Expand system to cover 500 HHs

Churo Bh Water Supply

Inadequate water services for the

growing market centre

Investigate, Plan and Design new Bh to

augment existing scheme

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Expand system to cover 500 HHs

Mogotio water supply Inadequate water services for the

growing town

Investigate Plan and Design new water

supply system.

Provide wastewater disposal system

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity ;

Expand system to cover 500 HHs

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 189

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Chirial dam Poor Water Coverage Feasibility study, Survey and design Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

Serve 6500 people and irrigate 150 acres

Muserech pan

Esageri division

Lack of accessibility water Pan already designed.

Construction of pan.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

It will serve 120 HHs

Kichingiri B/hole Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas; Increase

access to sanitation in rural areas;

Increase water storage and harvesting capacity

It will serve 130 HHs

Magonoi, Kapsia Borehole Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas; Increase

access to sanitation in rural areas

Kimose water supply project Lack of water services Construct intake arrangement, rising main,

150 m3 tank and distribution mains

3500 people and livestion served

Kipsaa Multi Purpose Dam Access to safe water for domestic,

irrigation and power generation

Planning and design of dam and auxiliary

facilities including power generation and

irrigation.

Design and Tender documents ready for the project

Molo Sirwet Dam Inadequate water services for

domestic and enhancing food

security

Investigate, Plan and Design Dam along

Molo River

Design and Tender documents ready for the project

Sasurwo Gravity water

project

Accessibility to safe water supply

for domestic and irrigation

Construct intake weir & sump, lay gravity

main, 150 m3 tank

280 HHs will be served and 50 acres under irrigation

Rossy water project Inadequate water services Investigate, plan and design. Construct

intake, rising main and distribution to serve

Kimng‘orom and parts of Emining

8,500 people to be served

Kibonjos Dam Access to safe water for domestic,

irrigation and power generation

Planning and design.

Construction of dam and auxiliary facilities.

4,500 HHs served;

1,500 Acres Irrigated;

Power generation.

Kipketum Water Project Access water for domestic use Investigate, plan and design project.

Construction of intake, rising main and

4,200 people

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 190

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

distribution and tanks

Construction of water pans Accessibility to livestock water Excavate pans Kolowa – 2, Nginyany – 2,

Mondi – 2, Tangulbei – 2, Churo - 2

Increased access to livestock water by 15 per cent in

2017.

Kimiren Dam Poor Water Coverage Complete design & construction of dam and

auxiliary facilities

Increase Water coverage

Soket Water Access safe water for domestic and

livestock

Construction of intake, rising main, tanks and

distribution system

12,000 People

Cheraik Gravity water

project

Ravine division

Accessibility to safe water supply

for domestic and irrigation

Construct intake weir & sump, lay gravity

main, 100 m3 tank

180 HHs will be served and 10 acres under irrigation

Chumet Gravity scheme Poor Water Coverage Feasibility study, design & construction Increase Water coverage & boost food security

Kokorwonin Borehole water

project

Esageri division

Access to safe water domestic Hydro geological survey has been done

Drill, equip and construction of water kiosks

200 HHs served

Kapkechir water project Lack of water services in the area Investigate, plan and design new dam To serve 6,000 people

Kamasaba pan

Ravine division

Access to safe water for domestic,

irrigation

Planning and design.

Construction of pan and auxiliary facilities.

500 HHs served;

20 Acres Irrigated

Ngeiwan (Kibolony)

Gravity Scheme

Poor Water Coverage Construction intake, storage tanks & pipeline Increase Water coverage & boost food security

Tembwee B/Hole

Ravine

Lack of access clean water Drill, equip and construction of water kiosks Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;.

Increase water storage and harvesting capacity

It will serve 100 HHs

Ketiborok Gravity Scheme Poor Water Coverage Construction intake, storage tanks & pipeline Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase Water coverage & boost food security

Tuikoin/Sinonin water

project

Ravine Division

Lack of access clean water Construct intake weir & sump, lay 10 kms

gravity main, 2NO.100 m3 tank

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

300 HHs shall be served

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 191

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Mochongoi Health Centre Inadequate water services in

Mochongoi centre and its environs

Stiting, drilling and equipping.

Construction of pump house.

Laying of rising main and distribution lines.

Construction of 100m3masonry tank.

Hooking electricity mains.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

2,000 people and health centre

Manuare-Ngarie water

project

Limited water services Construct intake weir, 100m3 tank, rising

main and distribution lines.

Construct pump house, hooking of electricity

and install pumping equipment.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

To serve 3,00 people and livestock

Kakapul shallow well

Kolowa Division

Limited access to safe water Motorize kakapul shallow well, pipeline – 3

km, storage tank – 50 m³

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity,

Increase access to supply to 100 HHs by 2014.

Spring rehabilitation Limited source yield and coverage

of supply

Katupen – pipeline repairs and extension

Nangarua – intake and storage

Chewarany – intake and pipleline

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase access to 300 HHs by 2016.

Kesesya Dam Poor Water Coverage Feasibility study, design & construction Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase Water coverage & boost food security.

Sitotwet Water Project Construct pump house, install pumpset, lay

of rising main and distribution lines;

Construct 150m3 tank.

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

1,250 people to be served

Lobotchun (Sibilo) Pan Poor Water Coverage Feasibility study, design and construction Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Increase Water coverage & boost food security

Kaginatia Pan Poor Water Coverage Feasibility study, design & construction Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 192

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Increase Water coverage & boost food security

Kimng‘orom Flow

Regulation Dam

Flow in Perkerra river fluctuates and

affect users downstream

Site already identified. Plan and design dam

and auxiliary facilities

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity;

Regulate flow and serve 120,000 people and livestock

downstream including Perkerra irrigation scheme

Rehabilitation of water

schemes

Disasters such as droughts, floods,

displacements and landslides cause a

lot suffering

Provide alternative water system in order to

help in restoring normalcy by absorbing

shocks inflicted by the calamities

Improve access to safe water in rural areas;

Increase access to sanitation in rural areas;

Increase water storage and harvesting capacity

15,000 people anticipated every 2 years

Irrigation Schemes

Eldume Irrigation scheme Ongoing phase 2 Lining of the remaining sections of main and

submain canals and construction of hydraulic

structures

Increase in irrigation acreage by 600 acres

Kapkuikui Irrigation

schemes

Completion of phase1and 2 Lining of main canal and hydraulic structures Increase irrigation acreage by 200 acres

Kamoskoi Irrigation

schemes

Ongoing and 2 Completion of main and sub main pipeline To supply water to irrigate 1,000 acres

Sandai Irrigation schemes Ongoing phase 1and 2 Completion of lining of main and sub main

canals

Increase irrigation acreage by 800 acres

Barwessa Irrigation scheme Ongoing phase 1 and 2 Lining of main canal and laterals Increase irrigation water efficiency and acreage

Lentorok Irrigation scheme Ongoing Irrigation headworks To irrigate 120 acres to cater for 70 HHs

Amaya – Nyalilpich Ongoing Survey, Design and construct headworks and

mains

New irrigation area

Emining Irrigation scheme Ongoing Construction of headworks and auxiliary

facilities

350 acres to benefit over 70 HHs

Molo Sirwe irrigation

scheme

Ongoing Construction of headworks and auxiliary

facilities

400 acres of new irrigation area

Maji Moto Irrigation

scheme

Ongoing Construction of headworks and auxiliary

facilities

250 acres

Ketikwo Irrigation scheme Ongoing Investigate, survey and design dam and

auxiliary facilities

200 acres

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 193

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Kipkokoi Irrigation scheme Ongoing Investigate, survey and design dam and

auxiliary facilities

300 acres

Ng‘enyin Irrigation scheme Ongoing Rehabilitate and lining of main canal 240 acres

Siriewo Irrigation Scheme New Investigate, Survey and Design and

construction of dam and auxiliary facilities

New irrigation area

Tangulbei irrigation scheme New Investigate, Survey and Design and

construction of dam and auxiliary facilities

New irrigation area

Ponpon Irrigation scheme New Investigate, Survey and Design and

construction of dam and auxiliary facilities

New irrigation area

Oighon – Korossi Irrigation

scheme

New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

New irrigation area

Barpello Irrigation scheme New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

New irrigation area

Emboses (Tirioko)

Irrigation scheme

New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

New irrigation area

Kolewon irrigation scheme New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

New irrigation area

Rebeko Irrigation scheme New Survey and Design and construction of

Headworks and pipeline with sprinler system

New irrigation area

Metipmoso Irrigation

scheme

New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

100 HHs

Kapkelelwa Irrigation

scheme

New Investigate, Survey and Design and

construction of Headworks and pipeline

60 HHs

Cheraik Irrigation scheme New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

100 acres to be irrigated

Aawei Irrigation scheme New Investigate, Survey and Design and 200 acres to be irrigated

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 194

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

construction of Headworks and auxiliary

facilities

Kicherere/Chebarsiat

Irrigation schem

New Investigate, survey and design dam and

auxiliary facilities

450 acres

Endao Irrigation scheme New Investigate, Survey and Design and

construction of Headworks and auxiliary

facilities

150 acres

Natan Irrigation scheme New Investigate, Survey and Design and

construction

500 acres

Equator (Mogotio) New Investigate, Survey and Design and

construction

500 acres

Kabiyet/Benonin Inadequate water supply Construction of 5 No tanks and 8 km of

pipelines

Improved access to safe water in rural areas

Barpello Gravity Scheme Inadequate water supply Construction of intake, gravity mains, tanks

and distribution

Improve access to the underserved area

Chepkanget intake water

supply

Inadequate water supply

Bokorin/Riwo

Construction of intake, gravity, tanks and

pipelines

Improve access to the underserved area

Awii Water Project Augmentation water supply Intake gravity mains and distributions Expand access to rural community

Tekeldet water project Inadequate water supply Provide water supply facilities to serve

community.

Improve access to safe water supply

Kokwototo water supply Present system inadequate Expand the distribution system and improve

scheme

Improve access to water by consumers

Chepkalacha borehole Present system inadequate Expand the distribution system and improve

scheme

Improve access to water by consumers

Kapropita spring expansion The spring is not fully utilized Construct more storage facilities and

pipelines

Increase the quantity of water available

Narosura water supply Existing system has been outstripped

by demand

Construct additional storage and pipelines

including new distribution sytem

Increase access to safe water for the community

Kibanger water project Inadequate distribution sytem Pipelaying to reach intended consumers Increase access to piped water

Nyoger gravity system Project not complete Pipelaying to reach intended consumers Increase access to piped water

Kapkiyai gravity water

project

Silting of intake and broken pipes Re-design and construct the intake and

rehabilitate/expand distribution

Make the water supply serve intended purpose

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 195

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Kibiriokwonin Water supply

extensions

Inadequate distribution systems Expansion of pipeline coverage Increase the HHs using piped water

Akorian borehole water

supply

Inadequate storage and distribution Piplaying and construction of tanks Increase the amount of water available

Soke Water Project Inadequate water supply Construction of intake, gravity mains, tanks

and distribution

Improve access to the underserved area

Kipkitur Water Project Inadequate water supply Construction of intake, rising mains, tanks

and distribution

Improve access to the underserved area

Kisanana Water Supply Inadequate water source for

Kisanana center

Drill and equip new borehole to augment

existing scheme. Rehabilitate existing

scheme

Increase the quantity of water available to consumers

Makutano – Maji Mazuri

Water supply

Inadequate water provision to the

community

Construction/augmentation and rehabilitation

of water supplies to serve the community

Community served by piped system

Mumberes Small Dam Inadequate water services in

Mumberes

IPD and Construct dam and auxiliary

facilities including pipelines, storage tanks

and distribution

Community served by piped system

Upper Chemususu water

supply systems

Inadequate water services in Upper

Chemususu dam

IPD and Construct water supplies to include

pipelines, storage tanks and distribution in

Ibobor, Kapsigot, Engunguny and Bikwen

Community served by piped system

Koiser/Ayatya Dam Inadequate water supply in the area IPD and Construct dam and auxiliary

facilities including pipelines, storage tanks

and distribution

Community served by piped system

Kuikui Water Supply Rehabilitation/ upgrading of water

scheme

Pipelaying anf construction of masonry tanks Increase access to piped water

Tirenwo water supply Rehabilitation/ upgrading of water

scheme

Improve intake and expansion of distribution

system

Increase quantity of water reaching consumers

Tebelekwo Bh Borehole not fully utilized Improve the borehole infrastructure to

include piping to community

Increase number of consumers accessing water

Nakurtakwei extension Chemususu pipeline does not serve

Nakurtakwei area

Construct tank and distribution system Access to safe drinking water by the community

Silonga BH water supply Point source Pipelaying and costruction of additional

tanks

Community get water closer to their HHs

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 196

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Nasinya BH water supply Point source Pipelaying and costruction of additional

tanks

Community get water closer to their HHs

Maoi 3 BH Augment Maoi systems Drill, equip and construct tanks and

distribution to serve Junction and Eldume

Access to safe drinking water by the community

Irrigation Schemes

Mosuro irrigation scheme Structures loose a lot of water Lining and wxpansion of system Increase acreage under irrigation

Rugus Irrigation Scheme Inadequate water reaching farm Expansion of existing infrastructure Increase acreage under irrigation

Embosos Irrigation scheme Expand scheme Investigate, plan and design scheme Increase acreage under irrigation

Chuine/Mbechot irriogation

scheme

Expand the community schemes Investigate, plan and design scheme Increase acreage under irrigation

Kiserian Irrigation scheme Improve the existing scheme Expansion of the existing infrastructure Increase acreage under irrigation

Endao irrigation scheme Inadequate water reaching farm Protection of headworks, transmission

system lining

Increase acreage under irrigation

Salabani irrigation scheme Improve existing scheme Investigate, plan and design scheme Increase acreage under irrigation

Mukuyuni irrigation scheme New irrigation scheme Investgate, plan and design scheme Increase acreage under irrigation

Nyalilpich Irrigation scheme Proposed scheme Investgate, plan and design scheme Increase acreage under irrigation

Desiliting of dams Increased surface water supply Investgate, plan and design scheme Excavation

Chesongo Borehole Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Ng‘usuria Water Scheme Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Kipsoit Water Scheme Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Sossion Dam Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Kibunder Dam Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 197

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Kiplewel Water Scheme Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Cheraik Dam Lack of clean water for consumption

and irrigation

Investgate, plan and design scheme Increased surface water supply and increased acreage

under irrigation

Desiliting of pans Increased surface water supply Investgate, plan and design scheme Excavation

Environmental Projects

Protection of water springs Increased underground water supply Planting of trees, grass

Construction of model tree

nursery one per sub-county

Increased availability of tree

seedlings for planting and serve as

demonstration site for farmers

Sub Counties Establishment of model tree nurseries

Development of dump sites To secure the dump sites and

manage solid waste

Sub counties Rehabilitation and fencing of all dumpsites

Soil erosion control To protect the soils Countywide Construction of check dams, gabions, terraces and

ground cover

Improved Charcoal

production

To improve the efficiency and

sustainability of charcoal production

Control and management of

invasive species Prosopis

juliflora

To reclaim land from prosopis

juliflora invasive weed

Marigat Sub county Use of improved eco friendly and sustainable

technology

Green Schools Programme Educate pupils and students on tree

planting and waste management Tree planting within schools

School cleanup

Segregation of waste

Establishment of green clubs

Agroforestry and

Reafforestation Programme

To increase forest cover Annual increase in forest cover by 1% from

33% to 38%

Requiring all land owners to have trees in at least 10%

of their land

Support commercial afforestation

Forest Products Value

Addition Programme

To develop the sustainable use of

forest products

Increase in proportion of income from

sustainable forestry products

Develop the sustainable development and utilization of

forest products e.g. Aloe products as well as furniture

and handicrafts from bamboofor income generation

Urban and Highway

Beautification Programme

To plant trees that make Baringo

more beautiful

Beautification of all towns and major

highways in the county

Select the signature species of each town

Tree planting in all plots and along the roads

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 198

Priorities for MTP Key issue/Challenge Proposed intervention Outcome /Impact indicators

Development of Kibute Dam Recreation Park

Housing

Development of

sites and services

schemes at existing urban

areas

Encourage landowners

To build decent houses

and to surrender part of

their land for

development

30 schemes with at

least 100 plot each

Negotiating for land

Zoning and planning

Building access roads

Water and sanitation

Private sector

Housing

Partnership

programme

Encourage private developers to

participate in housing development

1000 standard housing units Development of housing cooperatives

Partnering with locals and encouraging housing

developments.

Compiling and publishing data in the country

Provision of incentives e.g land rates

Partnering with NHC to build houses with county

government.

Appropriate

Building

Technology

programme

Advocate use of cost effective

construction technologies e.g hydro-

form

I Appropriate

Building

Technology Centre

(ABT) with I hydro-form

Machine in each sub-county

Promoting and funding

Research on development of low cost and locally

available building materials and techniques

Dissemination of knowledge and equipping available

polytechnics

Provision of equipment

Encouraging the locals to build decent houses with

decent homes with at least 40m2.

Security of public lands and

facilities

Safeguarding public land and

ensuring there is space for utilities

and future expansion in residential

areas

100 % of all public land Recovery of Government houses,

Liaising with NLC to recover illegally alienated land

Surveying, securing title and fencing of land for public

facilities

Securing way leaves and riparian reserves

Repair and maintenance of

government houses

To bring GOK houses to good

habitable state

100% of GOK houses to be repaired Routine maintenance

Major refurbishment

Fencing of GOK housing estates

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 199

11.6.3. Strategies to Mainstream Cross-cutting Issues

The sector addresses the social needs of the community through provision of basic social

facilities. It will try to ensure clean water is available to every household and for livestock.

The sector also employs a number of youths in casual labour thus mainstreaming youth

agenda and issues. Soil and water conservation efforts will be applied so as to protect the

environment since most of the projects have an impact on the environment.

11.7. General Economic, Commercial and Labour Affairs (GECLA)

The General Economic, Commercial and Labour Affairs (GECLA) Sector comprises of

eight sub-sectors namely: Regional Development Authorities; Labour; Trade; East Africa

Community (EAC); Tourism; Industrialization; Kenya Industrial Research and

Development Institute (KIRDI); and Productivity Centre of Kenya (PCK).

Vision:

A globally competitive economy with sustainable and equitable socio-

economic development.

Mission

To promote, co-ordinate and implement integrated socio-economic policies

and programs for a rapidly industrializing economy.

County Response to Sector Vision and Mission

The county will strive to improve trade and industry sub sectors in order to reduce

poverty. The measures that will be employed to realize this objective include: proper

utilization of resources in a sustainable manner with special emphasis put on

conservation of forests, development of agro based industries, like milk and meat

processing, to increase employment and income generating activities, advocating for

efficient rural finance and credit supply system for small scale farmers and

improvement of the governance. Security will be increased for trading, industrial

development and tourism to take place. At the same time, efforts will be focused on

maintenance, improvement and expansion of the infrastructure that is essential for the

sector to thrive. All these efforts will contribute greatly to the uplifting of the socio-

economic status of the county‘s inhabitants. Increased power supply will also lead to

emergence of small industries and the resultant income generating and employment

opportunities.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 200

Role of Stakeholders in the Sector

Stakeholders Role

Trade, Tourism,

Industrialization, Labour

Departments and Regional

Development Authorities,

Establishment of infrastructure and policy formulations for the

sector

Land Department Registration of land adjudication sections and settlement schemes,

issuance of title deeds and certificates of lease.

SACCOs, Micro-finance

institutions, Banks

Provision of credit facilities for small scale industries and farmers

for improving their inputs

Private sector Establishment of industries

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 201

11.7.1. Projects/Programmes

On-going projects/programmes

a) Flagship projects

Name of Project Location Description of Activities Status Implementation

Economic Stimulus Programme (ESP) (Fresh

Produce Markets)

Kabartonjo, Eldama Ravine,

Mogotio

Building of market shades and stalls Ongoing

CIPC Projects Kabarnet Building of Jua Kali Shades Complete

b) Other Projects

Trade and Industry

Project Name: Division/Location/

Constituency

Objectives Targets Description of Activities

Business management skills

development

Countywide

Equip traders with modern business management

skills;

Provide traders with an opportunity to network;

Increase their capacity to take risks;

Train 100 traders every

year

Identify training needs;

Develop training programs;

Train traders;

Evaluate training curriculum;

Work together with other service providers;

Emphasize cost sharing;

Business counseling

Countywide

Educate and inform entrepreneurs on new emerging

markets.

To counsel 500 traders

annually up to 2017 until

Offer counseling service to micro and small scale

enterprises.

Joint Loan Board

Countywide

Promote the growth of business in the county;

Create employment opportunities;

Promote availability of goods and services;

Future upcoming entrepreneurs to graduate for

commercial banks MFI loans.

To finance 80 traders

annually by Kshs1.05m

i.e. Kshs 7.35 m

Currently it has

disbursed a total of Kshs.

26, 325,000.00 to 1,271

beneficiaries

Finance micro and small scale enterprises

Encourage PPP

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 202

Export Promotion

Countywide

Increase the market for domestic product;

Enhance the competitiveness of export products;

Take advantage of the opportunities;

Expand the market for local products;

Add value to the export products.

Increase farm produce

for international markets

by 100% by 2017

26 sensitization meetings

held

To promote exports through

provision of information;

Identifying products with export potentials;

Assist in product development and marketing;

Sensitization of the business community on

opportunities provided by AGRA, Cotonou

agreement and Comesa.

Industrial promotion

Countywide

Attract both local and foreign investors 26 sensitization meetings

held

Identification of potential projects

evaluating the projects and sensitizing the local

community

Stalled projects/programmes

There are no stalled projects. This scenario can be attributed to the success of devolved funds projects implementations such as the CDF Fund

Outstanding Project Proposals

There are no outstanding projects proposals. This is because the projects proposals from the last Development Plans which were not

implemented have been included as new projects proposals in the County Development Profile

New Projects (MTP Consultations

Key Priority Area Key Issue Proposed interventions Indicators Outcomes

Short Term Medium Term

Untapped tourism

potential

Lack of industries

Inadequate promotion

of tourism scenery and

destinations in the

county;

Insufficient supply of

tourists Hotels and

hospitality services

Keep inventory and

document all potential

tourists sites;

Categorize tourists sites into

eco-tourism, sports-tourism,

cultural-tourism and general

tourism zones

Open up new tourists

sites;

Brand and market all the

tourists sites that have

been inventorized and

documented

Number of tourists sites in the

inventory;, documented and

branded;

Number of tourists who visit

the tourists sites in the county

every year;

campaigns undertaken per

year;

Number of tourists programs

initiated through PPP

Well documented and

branded tourists sites;

Increased tourists visits;

Increased awareness on

tourism importance;

Enhanced PPP

engagements in tourism

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 203

Key Priority Area Key Issue Proposed interventions Indicators Outcomes

Short Term Medium Term

Employment creation Inadequate skills;

Low literacy levels;

Inadequate sports

potential exploitation;

Use of child labour

Encourage Public Private

Partnerships to construct

sports training facilities

Initiate vocational training

colleges;

Create recreational and

talent academies in every

sub county in the county;

Establishment of talent

school especially

athletics;

Construct standard

stadiums;

Establish affordable

training camps and gyms

Increased skilled labor;

Increased literacy levels;

Unemployment rates in the

county;

Amounts of incomes for

households;

Number of talent academies

established;

Number of PPP initiated

training facilities;

Number of talent schools and

stadiums established

Increase in skilled labor in

the county;

Enhanced literacy levels;

Reduced unemployment

rates;

Improved incomes for

households;

Increased talent harnessing

Insufficient information

on the available

employment

opportunities in all

sectors;

Lack of an inventory of

youth, their

qualifications and

potential career

advancement

opportunities;

Insufficient post-

secondary school

training facilities

Institute an updated

inventory of available

employment opportunities in

all sectors;

Train youth on emerging

employment trends for easy

adaptation to emerging

employment opportunities;

Ensure 100% transition rates

to secondary and post-

secondary colleges

Establishment training

facility/college for labor

Number of training

centres/colleges established;

An inventory established on

employment opportunities and

youths and their qualifications;

One labor college established;

% of school transition rates

Improved engagement of

youth after Secondary

schools;

Updated inventory on

employment opportunities

;

Increased information

access on unemployment

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 204

Key Priority Area Key Issue Proposed interventions Indicators Outcomes

Short Term Medium Term

Saving, Investment

and Export

Inadequate access to

capital as collateral

Enhanced and improved

government credit facilities

such as the Women

Number of groups benefitting

from the enterprise funds;

Number of new business

enterprises initiated from the

Funds each year;

Amount of funds disbursed for

these enterprise funds

Improved economic

capacities;

Improved economic

returns

Insufficient Information

Technology access;

Inadequate access to

Financial Institutions;

Poor infrastructure

(Roads, Airstrips and

phone networks);

Insufficient access to

markets;

Low levels of savings

and investments in the

county;

Insufficient exports of

produce from the county

Strengthen Public Private

Partnerships;

Enhance the marketing

capacity of farmers;

Educate and facilitate

farmers to meet marketing

standards and tariffs;

Create County website;

Construct storage

facilities/cooling plants for

fresh produce

Enhancing existing

finance institutions

Rehabilitate airstrips at

Kabarnet and Kinyach

Number of ICT centres

established;

Number of airstrips

rehabilitated and maintained;

Value of produce reaching

market;

Number of SACCOs/banking

outlets established;

Number of people making

savings;

Volume of savings in the

county;

Volume of exports;

County website established,

maintained and updated;

Amount of updated market

information available to

farmers;

Number of banking systems

established

Increased ICT access;

Enhanced exposure to

international markets;

Enhanced value of produce

reaching markets;

Improved access to

financial services;

Enhanced saving and

investment culture;

Improved volume of

exports;

Improved communication

and interaction for best

practices sharing;

Enhanced access to market

information;

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 205

11.7.2. Proposed Projects (CIDP Subcounty Consultations)

Project Name Objectives Description of activities

Development of the Tourism Sector Plan

and Site Management Plans for all key

tourism facilities

To provide guidance for the development of the

tourism sector

Baseline Survey

Participatory Action Planning

Validation and Implementation

Development of Niche Products and

Services

To strengthen the Baringo tourism product Development of niche products e.g. birdwatching

Capacity Building Activities

Asset Preservation and Conservation

To develop game parks and reserves and other

assets for the tourism sector

Securing the land

Fencing

Purchase of Equipment

Conservation and protection of wildlife

Capacity Development

To develop adequate capacity to support the

tourism sector in the region

Training

Equipping Facilities

Recruitment of Staff

Expansion of the Tourist Information

Centre at Mogotio

To establish a significant tourist destination that

will attract visitors to the rest of the county

Design

Construction

Equipping

Establishment of Touristic Monuments

and Cultural Development Centres in

each sub county

To establish a significant tourist destination that

will attract visitors to the rest of the county

Design

Construction

Equipping

Acquisition of Courtesy Buses To facilitate visits by tourists to the county Purchases of buses

County Branding

To develop the image of the county as a progressive

home and attractive destination

Profiling the county

Generation

Media Campaigns

Livelihood Projects To reduce human wildlife conflict and ensure

proceeds of tourism trickle to communities

Promotion and Development of Tourism

Facilities

To increase the number of tourist in the county Eldama Ravine

1. Chemosusu Visitor Recreation Centre and Nature

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 206

Project Name Objectives Description of activities

Trails

2. Eldama-Kursalal Nature Trails

3. Tugumoi Migratory Bird Observatory Flyway

4. Equator Bird Flyway and Support Services

5. Development of County Camps at Chemorgong,

Kapkut, Esageri Forest and Sagat

South Baringo

1. Lake Bogoria National Reserve

a. Infrastructure Development

b. Signage and Safety Measures

c. Review of Management Plan and Policy

Document

2. Conservancy Establishment and Development

a. Chuine Conservancy

b. Proposed Arabal Mukutani Conservancy

and Corridor

c. Marigat Group Ranch Conservancy

Development

d. Kimalel-Sabor Group Ranch Conservancy

Development

e. Ng‘enyin Community Conservancy Area

3. Lake Baringo

a. Development of Lake Management Plan

b. Establishment of Safety and Navigation

Structures

c. Development of Water Sports and Sport

Fishing

d. Establishment of Inland Community

Livelihood Enterprises

e. Camp sites and picnic sites

4. Development of Ruko Conservancy

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 207

Project Name Objectives Description of activities

5. Development of Meisori Ilchamus Cultural Centre

and Ostrich Farm

6. Karau Campsite

Tiati

1. Opening of the Samburu-Baringo Tourist Circuit/

Corridor

a. Churo visitor monitoring centre

b. Peace Initiative Activities

c. Development of a linkage facility with

Laikipia, Samburu and Turkana

d. LAPPSET

2. Development of Conservancies

a. Kaptuya Conservancy including the

establishment of KWS post

b. Nachurur/Amaya Conservancy and

Cultural Centre

c. Mukutani-Ruko conservancy and corridor

d. Kositei ecotourism centre and nature trails

e. Development of Lomechan cave, Ostrich

Farm and campsite

3. Establishment of Reserves

a. Silale Game Reserve

b. Lokis Game Reserve

c. Cheparuas / Natan Conservancy

d. Paka/Korosi Conservancy

e. Mt Tiati Kamurio Geopark

4. Promotion of Home stay & Tourist Facility

Development

Baringo North

1. Lake Kamnarok Game Reserve

a. Development Planning and Implementation

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 208

Project Name Objectives Description of activities

2. Conservancy / Corridor Development

a. Kaborion Conservancy

b. Chepkirong Bartum Conservancies

c. Rorob Lingok

d. Forest Sites: Katimok, Saimo, Kasok

e. Ecolodges Tourist Resorts and County

Camps

3. Promotion of Scenic Sites Development

a. Simot Water Falls

b. Nuregoi Hill

c. Saimo Athletics Training Camp

4. Development and Promotion of Palanteology

Tourism

a. Museums

b. Field Study and Research Centres

c. Protection of Fossil Sites

5. Development of home stay tourism

6. Cultural Centres

Baringo Central

1. County Campsites Geoparks

a. Kipng‘ochoch

b. Kaprepo

c. Morop Tarambas

d. Kirdam

e. Pemwai Forest

2. Seguton

a. Governors Camp and Geopark

3. County Hilltops, Geoparks and Gorges

a. Kipsacho

b. Cheptuino

c. Development of nature trails and provision

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 209

Project Name Objectives Description of activities

of safety measures at Cheploch Gorge

4. Promotion and development of nature trails

5. Development and promotion of rural lodges and

campsites

a. Ng‘etmoi Sports Camp

6. County Communication (Radio) Towers and Masts

Mogotio

1. Promotion of eco tourism

(a) Kabarbama range

(b) Erong sanctuary

(c) Net bon maji moto

(d) Terebkororom

(e) Arus

(f) Curio shops and campsites

Countywide Projects

1. Youth and Women Enterprises

a. Curio shops and handicrafts workshop

b. Tourism Service Providers

c. Guides and Porters

d. Arthistes

2. Development of Viewpoints and Rest points

a. Lake Bogoria Kapulio Flamingo lookout

b. Ng‘iniot Kabarnet Kiboino Road

c. Katip Kituro

d. Ng‘in-ng‘in Sirwa

e. Kapkut Tugumoi

f. Ling‘ok Cliff

g. Kipng‘ochoch

h. Equator Mumberes

3. Tourism Signage

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 210

Project Name Objectives Description of activities

Construction / Upgrading of 2 markets at

major trading centress

Improved quality and hygiene and increased market

access.

Construction of new markets or Expansion and equipping of

existing markets to modern levels

Joint Trade Loans Programme

in the whole county

Provide affordable finance for small

scale enterprises.

Provide business management skills

to entrepreneurs.

Issuing of loans to micro

and small scale enterprises.

Training of entrepreneurs on

business management

Producer Groups Creation and facilitation of at least 40 ―Producer

Business Groups‖(PBGs) Partnership Building

Mobilization

Capacity Building

Joint PPP Investment in 2 Value

Addition Factories per county through

BIC with local cooperatives / investors

Promote industrial development, job creation and

value addition

Preparation of feasibility documents

Investment

Startup and Operation

Development of Minerals Resource Map

Develop an accurate resource profile of the county Study

Review

Publication

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 211

11.7.3. Strategies to mainstream cross cutting issues

In mainstreaming of cross cutting issues, the sector will ensure that environmental issues are

considered in all business and industry ventures. Issues of HIV/AIDS will also be integrated

in programmes especially those involving foreign tourists whose cultures my not conform to

the acceptable county morals. On HIV/AIDS, the sector will continue to integrate HIV/AIDS

curriculum in trainings for traders on entrepreneur skills.

The sector will also focus on technologies and enterprises that are friendly to the environment

including protection of water catchment areas that are found near industries. Sensitization on

the need to conserve the environment to promote sustainable development will also be

pursued.

This sector will, endeavor to mainstream cross cutting issues in all its activities. These issues

include youth, gender, disabled and orphans by incorporating in programmes being

implemented. The sector will also provide members of vulnerable groups with employment

opportunities whenever possible.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 212

11.8. Health Sector

The Health Sector comprises of Ministries of Medical Services, Public Health and Sanitation,

Research and Development sub-Sectors.

Vision

An efficient and high quality health care system that is accessible, equitable and

affordable for every Kenyan.

Mission

To promote and participate in the provision of integrated and high quality promotive,

preventive, curative and rehabilitative health care services to all Kenyans.

County Response to Sector Vision and Mission

The sector is mandated to provide, coordinate and promote the development proper

health care. The County Development stakeholders will give emphasis to review,

revise and establish a sustainable health management information system, provide

adequate, affordable, quality basic health, including supplies and equipment, improve

the cost revenue sharing, improve performance of Community Health Workers

(CHW‘s) and provide physical infrastructure in the hospital, health centers and

dispensaries. Rehabilitation of existing health facilities will also be done. Health

service management by posting competent and skilled staff at all levels of service

delivery.

Role of Stakeholders

Stake Holder Role

Government

Departments

Funding;

Staffing ;

Provision of drugs and equipments;

provides the relevant policy development

Development Partners Provides financial support for various;

Programmes within the sector;

Households, parents

and communities

Resource mobilization and

Management of the sector programmes at all levels of care

Community Participate in preventive medical activities and programmes and cost share in curative

medical services

FBOs Supplement government efforts in provision of medical services

Private Sector Supplement government efforts in provision and improving access to health services

KEMSA Procure and supply medical supplies. Replenishment of stocks of medical supplies in public

health facilities.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 213

11.8.1. Project and Programme Priorities

(a) Flagship Project ongoing

Name of Project Objectives Targets Description of Activities

Bartabwa Health Centre-

Model

Deliver Health Services to the

community

2000 people MCH/Building women and men wards/Incinerator/gate/Kitchen

Mochongoi Health Centre-

Model

Deliver Health Services to the

community

2000 people MCH/Building women and men wards/Incenerator/gate/Kitchen

(b)On-going Projects/Programmes: Health

Project Name

Location/ Sub-county/ Constituency

Description of Activities

Marigat - DMOH Office Completion Completions of remaining works

Kabarnet Male and Amenity Wards Construction

Marigat Paediatric ward Construction

Baringo North - Theatre Construction to start in January 2014

County Health Offices Construction to start in January2014

East Pokot Theatre - Chemolingot Construction

Eldama Ravine Rain Water Harvesting construction

Upgrade Mogotio Dispensary to Sub-County Hospital Construction

Kabarnet Mortuary - 48 bodies chamber and Structure Construction

East Pokot (Churo) - maternity ward To start in January 2014

Baringo North (Kuikui H. Centre) To start in January 2014

Eldama Ravine (Mortuary Coolers) To start in January 2014

Rehabilitation of Sewerage and Lagoon at Kabarnet. To start in January 2014

Upgrading dispensaries to offer laboratory services 2 dispensaries per ward To start in January 2014

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 214

Project Name

Location/ Sub-county/ Constituency

Description of Activities

Casualty Unit ongoing 2 Sub-Counties To start in January 2014

Construction/ Upgrading of Dispensaries at Ksh. 2.26 Million per Ward To start in January 2014

Vehicles purchase - 7 vehicles 4 Ambulances and 3 utility vehicles

Project Name Objectives Targets Description of Activities

Renovation of all health facilities Improve the health facilities. All the health facilities in the

county.

Repairs and painting.

Construction of Model Health centre Improve access to health care Five new facilities Construction and expansion of health

facilities

Construction of Dispensaries in the

county

Bring health

services nearer to

people

10 dispensaries in every Sub

County completed

Construction works

11.8.2. On-going Projects and Programmes: National Hospital Insurance Fund

Project Name Objectives Targets Description of Activities

Replacement of membership manila cards with

magnetic stripe photo cards

(All Sub counties)

To reduce recurrent costs of

yearly renewals and improve

on the speed of claim

reimbursements

All NIHF members and their

dependants

Photo collections, registration and updating of

members particulars and those of their dependants

Connecting of accredited health service

providers in the county to NHIF office.

(Kabarnet, Edama Ravine, Nogotio, Kabartonjo

and Marigat)

To improve the effectiveness

and efficiency of payment of

benefits to member/health

provides

To pay all submitted claims that

within 14 working days

Procurement of card readers;

training of staff;

Networking of the offices to the fund.

Increasing the coverage of NHIF insurance

cover among the informal sector (All Sub

counties)

To encourage the public to

empress social health

insurances system

All Kenyans of 18 years and

above but in formal employment

Mounting registrations;

campaigns in the county;

Advertising through the print media and radio

with the widest coverage within the county.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 215

Project Name Objectives Targets Description of Activities

Increase the number health services providers in

the underserved areas of the county that meet the

minimum NHIF accreditation criteria

Health centre with inpatient

facilities

To increase point of service to

NHIF contributors;

To improve accessibility of

health services

Mounting awareness campaigns

ii. New Projects (MTP 2 Consultations)

The MTP consultations identified health as an important priority and proposed various interventions whose expected outcome is a healthy

Population and a Health county

Key Issue Proposed interventions

Indicators

Lack of facilities & equipments Upgrade one hospital to a county referral hospital;

Expand bed capacity and build more wards at Kabarnet Sub

County hospital;

Establish a regional transfusion centre;

Construct one public health laboratory

Under five mortality rate reduced;

No.Maternal Mortality rate reduced;

Skilled Attendant at birth;

Children under 1year fully immunized;

HIV prevalence rate;

Patience on ARVs;

Proportion of inpatients with malaria;

No. of Health Facilities; Upgraded to Sub -County

Referral level;

No. of new staff recruited;

No. of dispensaries upgraded;

% increase of people accessing water

Upgrade 6 hospitals to a sub -County hospital; Hospitals -

Eldama Ravine, Marigat, Emining, Chemolingot, Kabartonjo,

Tenges.

Inefficient distribution & inadequate Medical

supplies

Strengthen and equip referral facilities/ systems

Procure seven ambulances.

Establish 60 community units in the county.

Availability of ambulance and equipments in the health

facilities

Improve access to health facilities Procure one integrated mobile clinic services vehicle. For

East Pokot Sub County

Accessabilty of health facilities in remote areas of the

county on time and distance.

Poor emergency Preparedness and response Completion of existing infrastructures and equipment of

Health facilities;

Preparedness and readiness to attend to emergecies

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 216

Key Issue Proposed interventions

Indicators

Replace all asbestos roofs for health facilities. Complete

Kipnai Dispensary, Chemolingot Ward and theatre, Marigat

Maternity Ward, Kabartonjo X-ray department. Kituro health

centre, Tilingwa dispensary, Eldama ravine Mortuary,

Nakoko, Kadokoi, Katungura, Chepkalacha, Mugurin

dispensary, Kipsogon, Chemoinoi, Muchongoi, Sibilo.

High HIV/AIDS prevalence Recruit additional Staff as per the cadres required

To be deployed as required throughout the county;

The rate of prevalence in the county

Under-staffing, inadequate referral facilities

Facilities are insufficiently equipped

Lack of casualty unit in each of the existing

health facility

Lack of an emergency unit each of the four

district hospitals

All Health workers to be trained; to upgrade their skills/

Inservice training. University trainings etc.

Procurement of New equipments for the staff / Built casuality

and Emergency units in the health facilities

Number of skilled staff deployed in the health sector/

Modern equipments installed in the health facilities.

IV services lacking severely Continuous training of staff / Upgrading of skills to all

cadres;

To be deployed as required throughout the county;

Number of staff that upgrade their skills and deployed

Inadequate Human Resource Development Employment and deployment of support staff.

Appraisal and promotion of staff according to duration of

service.

Training of supervisors on appraisal systems.

Number of staff employed and deployed.

Number of staff trained and promoted

Promote staff who have stagnated for over 3 years;

Review and harmonize salaries.

Provide insurance covers to staff.

Provide hardship and extraneous allowance

Improve remuneration for staff

Establish of a county central supply store at Kabarnet.

Number of staff promoted/ Salary structures

harmonized/other emoluments worked on.

Inefficient distribution & inadequate Medical

supplies

Establish a county pool system.

Establish a county supply store for Drugs, Vaccines (Cold

Chain), Non-pharmaceutical equipments, reagents and

Medical supplies store established to store vaccines/

Lorry for distribution procured.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 217

Key Issue Proposed interventions

Indicators

chemicals

Procure one Lorry.

Procure seven utility vehicles.

Inefficient transport system Procure vehicles for transportation and logistics

This interventions to target schools, market centers , villages

Number of vehicles procured for logistics.

Poor community Environmental Health Scaling up Latrine coverage by 20% All 6 Sub County

headquarters

Percentage of latrine coverage

Poor Urban Sanitation Develop sewerage system at Eldama Ravine, Marigat,

Emining, Chemolingot, Kabartonjo, Tenges health facilities

Sewarage systems established in medical facilities

Poor Solid Waste Management Improve solid waste management: - construct 10 incinerators

in hospitals at Kabarnet

10 incinerators established in the health facilities.

Poor Solid Waste Management Construct a pathological incinerator for the county referral

hospital at Eldama Ravine, Marigat, Mogotio, Chemolingot,

Kabartonjo, Kabarnet towns

Number of pathological incinerators constructed in the

health facilities.

Poor Solid Waste Management Identify and develop dump-sites in the sub-counties at

Eldama Ravine, Marigat, Mogotio, Chemolingot, Kabartonjo,

Kabarnet.

Number of dumpsites established in the county

Poor disease response by the medics Set aside sub-county Outbreak Response funds for Disease

Outbreak Management Unit at Kabarnet

Funds for disease outbreak response established in the

budgets.

Poor Keeping of disease data Establish a county data base centre Disease databank for the county established

11.8.3. Proposed Projects/ Programmes: Health Services

Project Name

Objectives Targets Description of Activities

Completion and equipping of

all stalled and Continuing

Health Facilities in all

Constituencies in the County

Improvement of medical service

delivery and health care for the

community

Completed Health facilities Improvement of infrastructure

and equipment at the facility.

Upgrade Enhance the capacity of hospitals in the MTC upgraded Resource mobilization, Design, Construct and

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 218

Project Name

Objectives Targets Description of Activities

Medical Training Center at

Baringo County Referral

county with ready supply of medical

staff.

Bring medica services closer to the

people.

Equip

Upgrading the current level 3 sub-County

hospitals to level 4:

Marigat, Chemolingot, Tangulbei, Ng‘oron

Mogotio, Eldama Ravine and Kabartonjo

Improvement of medical service

delivery and health care for the

community

7 level IV hospitals

(Sub-County hospitals)

Resource mobilization, design, construction,

staffing and operationalisation

Support Kaptimbor to be a specialist maternity

hospital

Improvement of medical service

delivery and health care for the

community

Complete maternity units

established and equipped

Resource mobilization, design, construction,

staffing and operationalization

Upgrade 12 level II Health Centres to level III

health Facilities - 2 per Sub County

Improvement of medical service

delivery and health care for the

community

12 level III hospitals Construction, Repairs, equipping and staffing of

the facilities to merit upgrade.

Upgrade of 4 level I dispensaries to level II

health facility per ward

Improvement of medical service

delivery and health care for the

community

24 level II hospitals (Health

Centres)

Construction, Repairs, equipping and staffing of

the facilities to merit upgrade.

Construction of level I health facilities

(Dispensary) Countywide.

Improvement of medical service

delivery and health care for the

community

45 level I hospitals Construction, Repairs, equipping and staffing of

the facilities to merit upgrade.

Promote specialists in at least 2 hospitals for

Ophthalmology, trauma/orthopedic and Mental

areas/alcohol centre

Improvement of medical service

delivery and health care for the

community

Improve immunization coverage - countywide Increase coverage to 85% - national

target

Countywide Undertaking yearly NID campaigns in worst areas

Scale up Community health strategies/activities Improvement of medical service

delivery and health care for the

community

2 units per sub-County Supporting running of the units

Roll down of CLTS Improvement of sanitation Countywide Sanitation facilities and capacity activities within

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 219

Project Name

Objectives Targets Description of Activities

and health care for the

community

households/community levels

Support nutritional activities Improve nutritional status among key

populations

Countywide Support Nutritional activities

Seek/facilitate title deeds acquisition for all

health facilities

Improve planning and order in all

facilities

Countywide PDP plans and title deeds acquisitions

Acquire 7 more ambulances Improve ambulatory services 7 hospitals Procurement of 7 ambulances services and

management

Construction of staff houses Improve services delivery All hospitals and selected

health centres

Construction, Repairs, equipping and maintenance

of the facilities to merit upgrade.

Establish Pathology incinerators Improve disposals In 10 hospitals Constrution and maintenance

Health data management Improve data storage and use In all level 3 to 5 Set up and run

Road Safety Programme Creation of awareness on road safety for PSV

drivers and motor bike operators

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 220

11.8.4. Cross-cutting issues

While addressing health issues in the health facilities, gender will be considered. Efforts will

be put in place to capture data well to inform planning and policy. In both county and sub

county hospitals, youth friendly centers will be introduced and both the youth and other

patients encouraged toundergo VCT. Husbands will be encouraged to accompany their

spouses to the PMTCT through introducing male friendly services. Environmental

conservations methods and cleanliness will be intertwined with other health related courses

inducted to members of general public, this, will reduce malaria related cases. The above

strategies will ensure that the following MDGs are achieved; reduce child mortality, improve

maternal health, combat the spread of HIV and AIDS, malaria and other diseases, and ensure

environmental sustainability.

11.9. Social Protection Culture and Recreation

This sector at the County level is represented by sub sectors such as, Gender, Children

and Social development, special programmes; youth affairs and sports and related

research and Development.

Vision

Sustainable and equitable socio-economic development and empowerment of all

Kenyans.

Mission

To formulate, mainstream and implement responsive policies through coordinated

strategies for sustained socio-economic development of the country and

empowerment of vulnerable and marginalized groups and areas.

11.9.1. County Response to Sector Vision and Mission

There have been various efforts to enhance the community capacities for self reliance

and greater participation by all in the development process of the county. This has

been done through community mobilizations as supporting community based

development programmes with particular emphasis on women, children, older

persons, youth, physically challenged persons, the poor, internally displaced persons

and other disadvantaged groups. CDF, YEDF, WEDF, special fund for PSWD/PWDs,

OPCT and Children Funds has played a critical role in empowering youth, women,

PSWD/PWDs, Older persons (65 and above) and children. Constituency HIV/AIDS

Fund has also supported HIV/AIDS control interventions in the county. Other

interventions on drought preparedness, mitigation against drought effects, provision

of relief food and reconstruction will be scaled up.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 221

Role of Stakeholders in the Sector

Stakeholder Role

Provincial Administration Enable a good environment for political, social and economic development

Micro Finance institutions Provide credit facilities

Development Partners resource mobilization

CSOs Supplement the government effort in providing sourcing and mobilizing resources

Private sector Provide local resources

Community Participate in local development projects

NACADA Drug abuse awareness campaign

World Vision, Christian Fund,

Action Aid- (NGO‘s)

Provision of text books and physical facilities to schools, support children from poor families with fees and uniforms (child

sponsorship)

Social Services Department Mobilize communities to form groups to address their local problems, provide training to groups registered by the

department, avail grants to groups and persons with disability, elderly, loans to women, mitigate against FGM/SGBV,

enhance 30% affirmative rule in dev., employment, committees, entrench the Disability Act 2003 .

Sport Department/ Youth Office Coordinate sporting activities, provide advice on sports related matters, and tap the local sporting talents and coordination of

youth affairs.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 222

11.9.2. Projects and Programmes

On- going Project/Programmes Project Name

Objectives Targets Description of Activities

Youth Enterprise Development

fund Sub County scheme

Empower youth groups start/upgrade

their enterprises

All registered youth groups in the

County

Provides loans of minimum of Ksh.50,000 to

youth groups to run their enterprises

Youth Enterprises Development

Funds Financial intermediary

scheme

Empower individual youth/Youth groups

to start/ upgrade their enterprises

All the youths in the county Youth apply for the loan as per the financial

intermediary regulations the amount of the loan is

up to a maximum of Kshs.500,000

Youth Polytechnic training

programmes

Equip youth with technical knowledge

/skills

All youths in the county interested in

technical fields

Youths enroll with youth polytechnic for a two

year training on variety of technical fields

Children right awareness

campaign

To create an awareness on children right

protection in the County

Harmful cultural practices

Child protection and care

Child maintenances and custody

Children in conflict with the law

Public meeting in the County organized at

location, sub-county

To address higher institution of leaning and leader

forum on child rights.

Children events Support the participation of children in

children national events in the county

Organize participation of children in

children National events that include

Day of African child

World orphans day

Breast feeding week

World day against child labour

Worlds play day

Universal children day

The children events to be done at sub-county

level.

County Children Assembly Children representative in the County to

Assembly twice a year.

44 children that form the Assembly,

assemble twice a year for discussion

on children issues.

Twice in year children representatives assemble at

County level for a County children Assembly.

Children desk Every police station to have a functional

children desk.

All police stations in the County Children desk facilities, personnel

Volunteer children officer Every location in the County to have at

least one volunteer children officer.

All location in the County Recruitment and training of volunteer children

officer (VC0‘s)

Charitable children institutions To register new charitable children Register 4 new charitable institution Registration procedures and regulations of CCl‘s

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 223

Project Name

Objectives Targets Description of Activities

institutions.

To inspect charitable children institution.

Inspect all the existing and new

charitable children institutions

to be followed.

Area advisory committees to recommend

registration and the sections

Care and protection of children County support to orphans and

vulnerable children, children with

disability, children living in street

children of imprisoned mothers

Orphans and vulnerable children

Children with disability

Children hung in street.

Children of imprisoned mother

County support for care and protection of children.

County child protection network Establishment of the county child

protection network

All stakeholders in children issues in

the county

Identification of stakeholders

Stakeholders forum

Area Advisory Council Operationalisation of localitional area

advisory councils at district area

advisory council.

All location

All sub-counties

Line ministries members, FBO‘s, CBO‘s and

Business community members to be engaged to

form area advisory councils

Project Name Objectives Targets Description of Activities.

Youth Enterprise Fund

Creates jobs

Reduce idleness/drug

abuse/crime.

Provide capital for

investment.

Spur youth creativity.

Create interest in youth

on financial institutions.

Youth groups.

Youth aged between 18-35

years.

Advance loans to qualified youth groups(Max Kshs 50,000)

Advance loans to qualified individual or groups by engaged banks and

financial intermediaries.

Youth Empowerment Centres

(county wide)

To equip the youth with

information relevant to

their day today activities

and engagement.

To provide policy and

development information

such as vision 2030,

MDGs, youth policy and

so on.

Youth aged between 15-35

years.

To provide training on specific and identified areas.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 224

Project Name Objectives Targets Description of Activities.

Women Enterprise Development

Fund/Flagship project/county wide

To provide capital to

women & women groups

to expand their projects

3000 women and women

groups

Revolving loan schemes to individual and well performing women

groups./Can be replicated by the county government and its supporting

partners

PWSD –CT Program/Flagship

project/countywide

To provide grants/stipend

to persons with severe

disability as a source of

livelihood.

140x6 sub-counties=840

persons

Grant to severely disabled persons/Can be replicated by the county

government and its supporting partners as the clients are more than the

national government is supporting –over 3,000 needy cases

Orphan and Vulnerable Children

funds

To provide the orphaned

and vulnerable children

with a source of

livelihood.

3,000 households Grant to the orphaned and vulnerable children.

Cash transfer for the Older persons

(65 yrs and above) /Flagship

project/county wide

To provide the elderly

persons with a source of

livelihood.

4,500 persons Grant to the elderly persons./ Can be replicated by the county

government and its partners as demand is higher than the national

government can provide

Grants to Community

initiatives/county wide

To supplement

community initiatives 7

serve as model groups

Well performing groups- 48

groups county wide

Grants to well performing groups selected randomly across the county

Formation of Gender working

committee/sub-counties and county

To assist in mitigating

FGM/SGBV &

entrenching 30% rule

The whole community Structure to assist in mainstreaming Gender issues in the community

Formation of Disability working

committees/sub-county & county

To assist in mitigating &

entrenching disability

issues

The whole community Structure to assist in mainstreaming disability issues.

Training & supervision/county

wide

To capacity build

communities

The whole community To train individuals, groups, and communities on various group

dynamics 7 government policies

Construction of dining hall and

general refurbishment at CCSP

Marigat

To facilitate training Trainers/community To construct hall and refurbish roof of other buildings

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 225

Project Name Objectives Targets Description of Activities.

Construction of sub-county Gender

and Social Dev. Offices at Marigat,

East Pokot, Baringo North and

Mogotio

To house the department

staff so as to serve

wananchi

Department staff / community To construct offices

Refurbishment of houses, road

repair, rain water harvesting at

Kabarnet V/R Centre

To serve the

trainees/staff/clients

Trainees/staff/clients To refurbish, repair road and rain water harvesting

Purchase IT equipments To digitalize services in

the various dept. offices

Staff/clients To purchase IT equipments.

11.9.3. New Projects (MPT 2 Consultations)

Key Priority Area Key Issue Proposed interventions

Short term Medium term

Culture Retrogressive cultural practices Campaigns to take children to school

Organize exchange programmes for

youths to share ideas

Identify and promote talents and

artists.

Organize cultural events

Sensitize the communities against

retrogressive cultures

Allocate funds for these activities.

Youth/Empowerment Lack of skills/ entrepreneurship spirit

amongst youths

Develop youth polytechnics;

Enhance Youth enterprise Fund

One youth polytechnic per

division

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 226

Key Priority Area Key Issue Proposed interventions

Short term Medium term

Children Child Abuse and Neglect

Employ more staff to implement the

children‘s Act Conduct lobbying and

advocacy against child abuse and

neglect;

Enforce the children rights bill

Strengthen volunteer systems at

the county level. One rescue

centre per Sub County.

Allocate funds for these

programmes

Gender Mainstreaming Gender discrimination in accessing &

controlling of resources

Establish rescue centres in the

county deploy gender officers to all

Sub Counties;

Enforcement of gender Employ

more staff;

Train opinion leaders;

Encourage women participation in

leadership positions

Organise women through

registration of groups;

Enhance Women enterprise laws;

Implement policy of a third rule of

women inclusion in all committees

Allocate funds for these

programmes

Youth Empowerment Lack of youth friendly centres establish youth friendly centers -

sports facilities, rehabilitation

centres, youth empowerment

centres; Establish mentorship

programmes;

allocate funds for registration and

trainings

3 training camps

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 227

Key Priority Area Key Issue Proposed interventions

Short term Medium term

Advocacy and lobbying for youth

issues;

Disabilities/PLWHs Discrimination against the disable,

children, the aged and PLWHAs.

Make all institutions friendly to the

physically challenged persons at all

levels;

Support the physically challenged

with necessary tools and

equipments; Establish youth

friendly VCT centres; Enhance

Social protection for the aged and

vulnerable;

Establish homes for children, the

old, disable and other vulnerable

groups.

Rehabilitation centre in each sub

county;

Allocate funds for these

programmes; Enhance cash

transfer funds

Establish 6 youth friendly VCT

centre in the county – each Sub

Count;

Rescue centre Child abuse To establish a rescue centre at

Marigat by 2015 to be able to

accommodate 100 rescued children

Fully functional child rescue

centre

Juvenile system Ease access to justice To establish a child protection unit at

every police station in the county

Child acces to jstice

Acquire land for 1 Children home/rescue centre in

every sub-county

Child abuse Set aside land in every constituency

for establishment of children home

/rescue centre

Fully functional rescue centre

Project name and location Objectives Targets Descriptions of activities

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 228

Establishment of cultural Centres To preserve and conserve community‘s

cultural heritage ,tourist attraction and

acts as a repository to cultural materials

15 cultural centres Renovation of illchamus manyattas and increasing the

number from 2 to 3 – estimated to cost Sh200.000

cost Sh200.000

Building of guest houses similar to the Manyattas With

complete suits and a restaurant. Initial stage construct

three will cost an estimated kshs 500,000 each.

Totaling 1,500,000.

A curio shop at a cost of 500,000

Installation of electricity Sh35,000

Equipping the centre with furniture at accost of

Sh100,000

Completion and repair of carpark, toilets and fencing of

the compound Sh500,000

Lembus cultural centre

Located in Eldama Ravine

To preserve and conserve community‘s

cultural heritage ,tourist attraction and

acts as a repository to cultural materials

Lembus community and

environs

Building of guest houses similar to the cultural homes

With complete suits and a restaurant. initial stage

construct three will cost an estimated kshs 500,000

each. Totaling 1,500,000.

Curio shops at initial cost of kshs 500,000

Botanical garden fencing and getting seedlings at a cost

of kshs 200,000

Gallery renovation kshs 2000,000

Turuturu cultural centre

Located in Baringo North , kerio valley

To preserve and conserve community‘s

cultural heritage ,tourist attraction and

acts as a repository to cultural materials

Arror community and

its environs

Curio shop at kshs 1,500,000

3 Guest houses at accost of kshs 1,500,000

Gallery kshs 2,000,000

Tugen cultural centre

Located

To preserve and conserve community‘s

cultural heritage,tourist attraction and acts

as a repository to cultural materials

Tugen community and

its residents

A gallery of kshs 2,000,000

A curio shop kshs 1,500,000.

Guest house 1,500,000

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 229

Pokot cultural centre

To preserve and conserve community‘s

cultural heritage ,tourist attraction and

acts as a repository to cultural materials

Pokot community and

its environs

3 Guest house at accost of kshs 1,500,000 totalling to

1,500,000

Curio shop at a cost of 1, 500,000

Gallery renovation and standardizing kshs 2,000,000

Endorois cultural centre

Tugen and Endorois

community and its

environs

Curio shop kshs1, 500,000

Gallery kshs 2,000,000

Guest house 1,500,000

Conservation and preservation of cultural

sites

Loruk komolion - Marigat

Kipsaraman Ororin – Baringo north

BaringoTulwongoi-Eldama -ravine

Benongoi –Sirwa cultural high court

Sigoro clay –Koibatek

Kabicha-Bogoria

Kolowa Memorial

Conservation of cultural site and

marketing for tourist destination and

documentation

For future generation

and present community

at large.

Fencing

Building resting sites and shades for guests

Documentation of site and posting to website

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 230

11.9.4. Mainstreaming of Cross-cutting Issues

The proposed projects in the sector has an overall goal of alleviating poverty through various

strategies such as drought management, community driven development support to local

development, promotion of cultural tourism, youth and women enterprises funds, youth

polytechnics.

Through cultural centres, youth empowerment centres, sports activities and conflict

management efforts, the issue of national diversity is mainstreamed. Similarly, this sector is

made up of ministries that deal directly with youth affairs, gender concerns of the physically

challenged and environmental issues through the Ministry of Special Programmes. HIV and

AIDS issues are also mainstreamed through capacity building efforts by the special

programmes sub sector and community campaign drives targeting the youth.

There are efforts in the county to ensure that all the disadvantaged groups such as the youth,

people with disability, women are involved in decision making of various development

programmes and projects.

The sectors interventions targets national disasters such as floods, drought and HIV and

AIDS through ALRMP 11 programmes.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 231

11.10. Governance, Justice, Law and Order Sector (GJLOS)

The sector comprises of the following sub-sectors: Immigration and Registration of Persons;

Home Affairs; Justice, National Cohesion and Constitutional Affairs; Provincial

Administration and Internal security; State Law Office; Judiciary; Ethics and Anti-

Corruption Commission; Kenya National Audit Office; Independent Electoral and

Boundaries Commission, Directorate of Public Prosecution, National Police service

Commission and related research and Development. Others are Commission for

Implementation of the Constitution; Kenya National Commission on Human Rights and the

Office of the Director of Public Prosecutions; Gender and Equality Commission; Office of

the Registrar of Political Parties; Witnesses Protection Agency and Independent Policing

Oversight Authority.

Vision

A Secure, Just, Cohesive, Democratic, Accountable, Transparent and Conducive

Environment for a Competitive and Prosperous County.

Mission

To ensure effective and accountable leadership, promote a just, democratic and secure

environment and establish strong governance institutions to empower citizens, for the

achievement of socioeconomic and political development

County Response to Sector Vision and Mission

The county will ensure that there is an enabling environment in the county that will

encourage economic growth and poverty reduction. One of the most important issues to be

addressed during the period is security. In this regard, the police and provincial

Administration will ensure that there is no disruption of peace and rampant cattle rustling are

curtailed. On the other hand, the prisons and probation Departments will Endeavour to

rehabilitate convicted offenders so that they positively integrate into the community.

Role of the Stakeholders

Stakeholders Roles

Provincial

Administration

Law enforcement, arresting offenders, mobilization the public, chair

various development committee meetings.

Police Department Law enforcement, arresting and prosecution offenders.

Judiciary Listen and determine cases of people accused of breaking the law.

Prison Department Keep in custody those convicted or remanded by a court of law, and

rehabilitate inmates with a view of making them better citizens.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 232

Stakeholders Roles

Probation Department Giving information to courts regarding offenders, assisting youths to

discard anti-social behaviours, assisting youths to acquire social skills

that enhance their self image, ensure that those placed under probation

adhere to the provision of the probation.

Registration of

Persons.

Registration of Kenyans who have attained the age of 18 years or above

by issuing them with the national

Civil Registration

Department

Register births and deaths that occur in the Sub County and keep

statistics on the same. Publicize the importance of civil registration in

development planning.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 233

11.10.1. Projects and Programmes

Ongoing projects and programmes

a. Flagship Projects

Project Name

Objectives Targets Description of activities

Deputy County Commissioners office at Mogotio

Sub County

Create a working environment for the officers to

deliver better services.

One complete unit of administration

block

Build complete units of

offices

Deputy County Commissioners office at Baringo

South Sub County

Create a working environment for the officers to

deliver better services.

One complete unit of administration

block

Build complete units of

offices

b. Other projects:

Project Name

Objectives Targets Description of activities

Children‘s advisory

committee countywide

Put in place mechanism for dealing with issues

pertaining to children

To re-activate Sub Countys/divisions

committee to make them responsible

to children issue in terms of care and

protection

Train area advisory committee at division and

location level

Baseline survey on OVC

Establish the number of OVC in the County for

planning purpose

Complete the survey on OVC Data collection analysis documentation and

dissemination

Awareness creating and

advocacy by children

right

Inform the public on children rights to gather their

support in addressing children in need of special

protection (CNSP)

Undertake activity in all divisions

through the plan period

Conduct seminars.

Use community leader and public functions to

create awareness;

Empower children know and understand their

rights

Building Administration

Police Post at Chepkesin

To beefed up security and stem cattle rustling

between Baringo North Sub County and East

Pokot

Office and residential housing for the

officers.

Building and equipping the offices

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 234

Project Name

Objectives Targets Description of activities

Electricity Installation at

Loruk Police Station

Make working environment for the officers

comfortable

Instalation and wiring of the offices and

residential housing

Construction of Police

Station at Chemolingot

To beef up security for the county residents Office and residential housing for the

officers.

Building and equipping the offices and residents

for the officers

New Projects (MTP Consultations)

The MTP consultations identified security as a priority area that needed urgent attention.

Key Issue Proposed interventions Indicators Outcomes

Cattle rustling Short term Encourage free basic education including adult education;

More security officers to be posted to the county;

Better equipment to the security agencies;

Embrace community policing;

Introduce hotspot reporting centres;

Motor vehicles for security forces

Medium term

Build more Security posts stations;

Construct Security roads in the county;

Introduce technology in tracking bandits;

Establish a police division in each Sub County; & a police station at each

administrative location;

Allocate funds for community policing;

Housing at Mochongoi, Makutani in kinyang; and at each DO offices;

Rehabilitate existing houses at Kabarnet, Loruk & Kinyach;

Timely disbursement of funds;

Forensic laboratory the county.

Rates of crime;

Number of bandits arrested;

Number of security officer

deployed in the county;

Equipments assigned to the

security forces.;

Community policing

committee in place;

Hotspot centeres

Lower number of criminals arrested;

Establish more police divisions and

stations;

Enhance community policing;

Provide proper housing for police

officers;

Available funds for capacity building;

Established Forensic laboratory at the

county level and sub- labs at the

divisional level;

Purchase dmotor vehicles;

Install ICT in offices

Access to Justice Short Term

Allocate funds for establishments of state law office

Amount of funds allocated

to law and order

High court established;

State law office established in the

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 235

Key Issue Proposed interventions Indicators Outcomes

Long Term

Establish state law offices at the county level;

DPP to have a prosecutor in each court;

Have a high court at the county and sub-ordinate courts in each Sub

County

Establish mobile courts;

Enhance the use of Alternative Dispute Resolutions;

Provide adequate staff and transport facilities to each court;

department;

Establishment of conflict

resolution committee;

county; More security personnel

deployed to the county;

Weak aftercare and

Victim support

services

Provide after care support for released offenders (reintegration);

Mainstreaming the concerns of the victims;

Decentralize services to the Sub Counties and staffing;

Setting up of location case committees

Counselling and compensation to victims;

Enhance community service orders.

Allocate funds to these activities

Amount of fund allocated

Correctional services

Expansion of correctional services to the Sub County level;

Upgrade the main prison to remand all offenders;

Improve housing for prisons warders;

Enhance security at the prisons e.g. install CCTV and stable power;

Employ more staff;

Encourage community involvement in supervision and rehabilitation of

offenders;

Increase funding for social investigation;

Establish rehabilitation centres;

Empower offenders with skills;

Allocate funds to these activities

Corruption and

governance

Establish an Ethics and Anti-Corruption office at the county level;

Set up community anti-corruption committees;

Establishment of Administration of Justice office at the county;

Illicit brews

consumption

Increase the number of security personnel Amounts of illicit brews

captured

Number of security

Amounts of illicit brews captured

Number of security personnel deployed

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 236

Key Issue Proposed interventions Indicators Outcomes

personnel deployed

Social-cultural

practices

Initiate alternative rites of passage to alleviate FGM Number of reported cases of

FGM

Number of alternative rites

of passage held each year

Number of reported cases of FGM

Number of alternative rites of passage

held each year

Land related

conflicts/cases

Speed and fairly dispense of land related cases Number of households

possessing title deeds

Number of households possessing title

deeds

11.10.2. Proposed Projects

Project Name

Objectives Targets Description of activities

Construction of one magistrate court per

sub county

To provide accessible judicial services to the

residents of Baringo

6 magistrate's courts Design, construction, gazzetement, equip

and staffing

Construction of Chief's Office To provide accessible administration services 12 Chief's offices Design, construction, equip and staffing

Construction of AP and regular police

post

To provide accessible security services 12 police and AP posts Design, construction, equip and staffing

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 237

11.10.3. Strategies to Mainstream Cross-cutting Issues

In collaboration with other stakeholders, the sector will engage in initiatives to address

specific needs and vulnerability of children through OVC-CT programme. This will

endeavour to mitigate the OVC from the impact of HIV/AIDS menace. The state has duty to

provide access to protection and basic services, including legal aid and alternative care

mechanisms to children within a human rights framework.

The sector will work closely with other stakeholders on efforts to improve on the quality of

life through mainstreaming HIV and AIDS issues in their operations, engaging in behavior

change communication, protection of rights and access to justice for infected people and

others. The government has established HIV and AIDS control units in all ministries and

departments. However effective function of these units requires full support and facilitation

in terms of equipping them with necessary physical and human resources and efficient

coordination. The strategies of the sector will help to achieve the targets of MDG goal 6

which aims to combat HIV and AIDS, malaria and other diseases.

11.11. Finance and Economic Planning

Sector Vision and mission

Vision

A leading sector in legislation, public policy formulation, coordination, supervision and

prudent resource management.

Mission

Provide overall leadership and policy direction in resource mobilisation, management and

accountability for quality public service delivery.

Situation Analysis

The presence of sub-county treasury and planning units sets ground for utilization of County

Government resources. Operational financial institutions and devolved funds e.g. Youth and

Women Funds, CDF are critical in realizing funding mechanisms. Existing planning and

financial legislations e.g County Government Act 2012 and County Govt Public Finance

Management Transition Act 2013 will guide the impelementation of the Plan.

Inadequate public participation in planning and implementation require strengthening. Weak

linkage between development planning and budgetary allocatioon will also be addressed.

Establishment of economic and budget forum, harnessing public private partnership,public

participation will go along way in realizing the county vision

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 238

Role of Stakeholders

Name of Stakeholders Roles

County government departments-finance, planning,

public service

Provide leadership in resource mobilization, programme planning and implementation

County assembly and county executive Promoting quality policy, legislation, checks and controls

Donors and international community Addressing and supporting county government efforts in development

Private sector Harness community initiatives and social investments

Civil societies and public benefit organizations Build governance and institutional capacity at grassroots

Research and learning institutions Training, research and documentation

Local communities To help in Identifying Community empowerment and development of project proposals

National government Assist in the development of policy, budgetary allocations, planning guidelines and implementation of financial

regulations

11.11.1. Issues, Causes and proposed interventions in the Sub Sector

Subsector Issues

Causes Development

Objectives

Immediate

Objectives

Proposed Intervention

Planning and

development

Inadequate community

involvement in the

planning process

Poor representation of

the community

Low levels of

awareness on planning

processes among the

communities

To ensure participatory

and inclusive planning

processes

To have operational

communication

/consultation platforms at

various administrative

levels

Establishment of

communication/consultation platforms

down to the village level

Community participation in

programme/project management

Poor collaboration

among various

development agents

Poor reference to

existing plans

Disjointed funding and

implementation

frameworks

To ensure harmony and

linkages between

existing plans, funding

and programme

implementation

Consolidation of county

development plans and

their periodic

reviews(integrate, spatial,

sectoral and town plans)

Establishment of development

coordination units at county and lower

administrative levels

Finance Inadequate revenue

collection and budget

allocations

Limited sources of

revenue. Unexploited

revenue sources

inefficiencies in

revenue collection and

expenditure

To maximise on

revenue collection and

balanced budget

allocation

To explore new sources of

revenue

To enhance efficiency and

effectiveness in county

revenue collection and

expenditure

Legislations governing the management of

county finances

Implementation and enforcement of

existing county financial legislations

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 239

Subsector Issues

Causes Development

Objectives

Immediate

Objectives

Proposed Intervention

Delays in disbursement

of funds at county and

national levels

Bureaucratic financial

processes and

requirements

To offer timely and

efficient county

financial services

Constant consultation and

communication by relevant

stakeholders

Development of a service charter

Review of existing legislations to ease the

disbursement process

Adoption on technology in financial

management

Decentralization of county treasuries to the

sub-counties

Inadequate capacity to

handle budgeting

process

Inexperience on

transitional provisions

To have focused

budget and budget

processes

To have competent

personnel to handle

budgeting processes

Capacity building of staff

Adhering to the budget process timelines

and legislations

Lengthy tendering,

purchasing and supply

chain

Complex procurement

procedures

Enhance efficiency in

supply chain

management

To offer timely

procurement services

Review of existing procurement

legislations.

Functional procurement plans by various

entities.

Adoption on technology in supply chain

management.

Ongoing projects

Programme/Project Name Location

/Sub-County

/ Ward

Objectives Targets Description of activities

Community empowerment-

through CEISP

County wide Increase efficiency and

developmental impact of

devolved funds

% increase and growth of

annual revenue

Increasing public participation and voice of

the poorest members of the local

communities

East Pokot and Marigat Sub

County Information and

Documentation Centres

East Pokot and Marigat

sub counties

To strength planning unit and

community empowerment

Two operational

Information and

Documentation Centers

Construction, equipping, stocking, staffing

and community capacity building

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 240

New projects

Project Name Priority

Ranking

Location

/Level

Objectives Targets to be

met

Description of Activities Sources of Funds

Public Participation 2 Countywide To entrench public

participation in county

governance

30 wards Quarterly ward fora

Dissemination of

planning and policy

documents

Quarterly county

bulletins

County government

and Donors

Resource Mobilisation 1 County Increase county revenue for

programmes and projects

85B Investments fora

Resource mapping

Donor liaison

Trade fairs

Public Private

Partnerships

County Government

Planning units 5 County wide To ensure harmony and

linkages between existing

plans, funding and

programme implementation

1 sub county

30 wards

Plan annual reviews

Cross sectors main

streaming

Establish offices at ward

levels

staffing at ward levels

Donors and County

Government

Integrated Financial

Management Information

System (IFMIS)

3 County wide To enhance efficient

financial services

sub counties Establish treasuries

Equipping

Staffing

County Government

Integrated Monitoring

and Evaluation Unit

1 Sub Counties Tracking programme and

project results/trends

Sub Counties Capacity building

Feasibility studies

Field Visits

Reporting

Purchase of six four

wheel vehicles

Donors and County

Government

Community 6 Countywide Increase efficiency and wards Capacity building on the Donors and county

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 241

Project Name Priority

Ranking

Location

/Level

Objectives Targets to be

met

Description of Activities Sources of Funds

empowerment development impact of

devolved funds

local communities

Community access to

information development

projects

government

Procurement of ICT

materials, infrastructure

and equipment

3 Countywide To increase efficiency in

service delivery

To create a platform for

service delivery

County HQ

Subcounties and

Wards

Purchase of ICT

materials

County Goverment

GOK

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 242

Chapter Twelve

Monitoring and Evaluation Framework 12.1.Introduction

This chapter presents the monitoring and evaluation framework that will be used at the

National and County level to track progress on implementation of projects and programmes.

An indicative matrix detailing projects and programmes then costing implementing agencies

as well as monitoring tools and indicators which could be selected for the County, based on

projects and programmes identified in chapter three, is given as Appendix II.

12.2. Institutional Framework for Monitoring and Evaluation

At the National level, Monitoring and Evaluation is conducted through National Integrated

Monitoring and Evaluation System (NIMES), whose main aim is to improve the effectiveness

and quality of tracking of implementation of various development policies, strategies and

programmes. The county and lower level monitoring and evaluation of projects and

programmes are part of this system.

Baringo County will put in place a County Monitoring and Evaluation system to serve the

needs of the County Government, while complementing the National M&E system. The

system will take cognizance of the projects and programmes included in the County

Integrated Development Plans as well as indicators facilitating the MTEF process, and

development aspects of the respective county.

An indicative M&E impact /performance indicators is presented in below.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 243

Health Sector

Project Name Cost

Estimate

(KSH)

Time

Frame M &E

Indicators

M&E

Tools

Implementing

Agency

Source of funds Implementation Status

Completion and equipping of

all stalled and Continuing

Health Facilities in all

Constituencies in the County( 42)

260M

2013-2017 No. of Fully

operational

health facilities

Site

visiting

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

Stalled

Upgrade

Medical Training Center at

Baringo County Referral

70M 2013-2017 An upgraded

MTC

Site

visiting

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

New

Establishment of sub-county

hospitals by Development and

upgrading of the level two III

hospitals to level IV specialist

hospitals

in each Sub-County

500M 2013-2017 No. of level iv

hospitals

Site

visiting

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

New

Upgrade of level II Health Centres

to level III health Facilities(Sub-

district). 2 per sub county

600M 2013-2017 No. of level iii

Hospitals

Site

visiting

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

New

Upgrade of 2 level I dispensaries

to level II health facility per ward

2.4 B 2013-2017 No. of level

hospitals per

ward

Site

visiting

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

New

Construction of 1 level I health

facility (Dispensary) per Ward.

1.5B 2013-2017 No. of

dispensaries

constructed

Site Visits

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt.

New

Construction of modern public

toilets in major towns

48M 2013-2017 No. of modern

public toilets

Site visits

Reports

County Govt.

Baringo

County Govt. Of Baringo

National Govt., Donors

Proposed/New

Supply of drugs and vacinnes to

182 health facilities

1.2B 2013-2017 No.of health

centres supplied

Store

ledger

County Govt.

Baringo

County Govt,national

government,donors

Ongoing

Construction/Expansion of

mortuary per Sub-County and

cemetry

192M 2013-2017 No. of

mortuaries

No of cemetries

Site visits

Reports

BCG County Govt. Of Baringo

National Govt., Donors

New/Ongoing

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 244

Agriculture, Livestock and Fisheries Sector

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

Livestock Upgrading

Program

200M 2013-2017 No. of Livestock

program in place

No. of upgraded

livestock

Increased milk and

meat production

No. of research

conducted

Reports

Site visits

County Govt.

Baringo

County Govt. Of

Baringo National

Govt.

New

Milk processing plant

50,000 litres per day

200M 2013-2017 Processing plant

constructed

Completion

certificate

County Govt.

Baringo

County Govt.National

government and

Donors

New

Disease control and

clinical services

100M 2013-2017 No. of livestock

vaccinated

No.of trainings held

No.of livestock

accessing cattle

dips

Reports,

Site visits

County Govt.

Baringo

County Govt. Of

Baringo National

Govt.Partners

New/Ongoing

Hides and skins

improvement and leather

development

10M 2013-2017 No. of trainings

held

Reports County Govt.

Baringo

County Govt. Of

Baringo,donors

New

Cattle branding 20 M 2013-2017 No. of animals

branded

Reports County Govt. of

Baringo

County Govt, Ongoing

Construction of livestock

yard

6M 2013-2017 No. of yards

constructed

Completion

Certificate

County Govt.

Baringo

County Govt. of

Baringo

New

Construction of one

international slaughter

houses

240M 2013-2017 No. of slaughter

house constructed

Completion

certificate

CGB CGB,Partner ,

National government

New

Construction and

rehabilitation of 46

slaughter houses

400M 2013-2017 No. of slaughter

houses constructed

and rehabilitated,

Completion

certificate

CGB CGB,Partner,

New/Ongoing

Establishment of Fish

Farming

100M 2013-2017 No. of fish ponds

established

No. of pans and

dams stocked.

No.of trainings held

Site visiting

Reports

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 245

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

Revival of 43 stalled Cattle

dips and operationalisation

of existing ones

8.6M 2013-2017 No. of cattle dips in

operation

Site visiting

Reports

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

Stalled

Construction of 1 new

cattle dip per ward.

27M 2013-2017 No. of cattle dips

per ward

constructed.

Site visiting

Reports

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

BeeKeeping/Farming

project

200M 2013-2017 No. of trainings

held and beehives

installed

Site visiting

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

Expansion and

Establisment of Irrigation

Schemes

1.2B 2013-2017 Increased food

production

Site visiting

Reports

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

Provision of farm inputs 500M 2013-2017 No. of farmers

accessing the inputs

Reports County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

Promotion of the

Cooperative movement

1.5B 2013-2017 No. of cooperatives

form, No of

trainings held,

No of cooperative

doing value

addition

Site visiting

Reports

County Govt.

Baringo

County Govt. Of

Baringo

National Govt.

New

Constructionof meat

Processing Plant at

Kimalel in Marigat

100M 2013-2017 Meat processing

factory

Site visiting

Reports

County

Government of.

Baringo

County Govt. Of

Baringo

National Govt.

New

Construction to

Completion of a Tannery

at Mogotio

50M 2013-2013 Hides and Skins

processing

Site visits

Reports

County

Government of.

Baringo

County Government

of. Baringo

Ongoing

Construction of 3 Cereal

Stores at Mogotio,

Mochongoi and

Kabartonjo

150M 2013-2017 Number of cereal

stores constructed

Site visits County

Government of.

Baringo

County Govt. Of

Baringo

National Govt

New

Fresh produce cooler

facility

100M 2013-2017 No of coolers

purchased

Delivery notes CGB County Govt. Of

Baringo

National

Govt,Partners

New

Green houses and 60M 2013-2017 No.of green houses Reports and CGB County Govt. Of New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 246

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

demonstrations

(horticulture)

purchased,No of

farmers trained

site visits Baringo

National

Govt,Partners

Water-harvesting for food

security projects.

40M 2013-2017 No. of water pans

constructed

No.of trainings held

Completion

certificate and

site visits

CGB County Govt. Of

Baringo

National

Govt,Partners

Ongoing

Orphan crops development

programme

5M 2013-2017 No of groups

benefited

Reports CGB CGB and partners New

NjaaMarufuku Kenya-

county wide

15M 2013-2017 No of groups

funded,No of

training held

Reports and

field visits

CGB CGB and partners Ongoing

Cotton production-ASAL;

Salawa, Sacho, Kimose

and Tenges

10M 2013-2017 No of trainings

held, acreage under

cultivation

Reports,

field visits

CGB CGB and partners Ongoing/New

Traditional high value

crops seed development-

ASAL

10M 2013-2017 No of trainings

held, acreage under

cultivation

Reports,

field visits

CGB CGB and partners New

Enhance Research-

Extension- Farmer

Linkages

200M 2013-2017 No of research held Reports CGB CGB,National Govt.

and partners

Ongoing

Construction of Livestock

Sales Yards at Marigat, Kolowa, Salawa, Kinyach, Kaptara, Kasitet, Amaya, Tangulbei, Kapcholoi, Emining, Kibotany, Kaben

28M 2013-2017 14 livestock yards Site visit GOK, CGB&

Donors

County

Govt/Donors/National

Govt

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 247

EducationSector

Project Name Cost

Estimate

(KSh.)

Time

Frame

Monitoring

Indicators

Monitoring Tools Implementing Agency Source of funds Implementation

Status

Construction of 372 ECDE

Centres in primary schools

in Baringo County

850 M 2013-2017 Number of ECDE

centres constructed

primary schools

Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/ donors/

GOK

New and ongoing

Construction of 4 new

ECDE Centres per sub

county

360 M 2013-2017 120 new ECDE

schools

Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Construction of 3 and

Upgrading of 12youth

polytechnics in the county

450M 2013-2017 15Youth

Polytechnic

Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Construction of 1

Community Resource

Centre per ward

300M 2013-2017 No ofresource

centres established,

Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Establishment of one

Integrated Special school

per sub

county/Constituency

180M 2013-2017 6 (Six) Integrated

Schools

site visits/Reports County Government of

Baringo/ National

Government.

County

Government of

Baringo/donors

New

Setting up a County

Bursary, Scholarship Fund

250M 2013-2017 Bursary/Scholarship

fund Established

Conduct site

visits/Reports

County Government of

Baringo/National

Government

County

Government of

Baringo/donors

New

Construction of 24 primary

school classrooms/

infrastructure per ward in

Baringo county

1.1B 2013-2017 720 Classrooms Conduct site

visits/Reports

County Government of

Baringo/National

Government

National

Government

/donors

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 248

Project Name Cost

Estimate

(KSh.)

Time

Frame

Monitoring

Indicators

Monitoring Tools Implementing Agency Source of funds Implementation

Status

Construction of 12

secondary school

classrooms/infrastructure

per ward in Baringo

County.

504M 2013-2017 360 classrooms Conduct site

visits/Reports

County Government of

Baringo/National

Government.

National

Government/donors

New

Construction of all

incomplete schools as

reflected in Annex of

projects.

500M 2013-2017 All incomplete

schools

Conduct site

visits/Reports

County Government of

Baringo

National

Government/donors

Ongoing

Establishment/Construction

of Baringo ECDE college

100M 2013-2017 One ECDE College Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Establishment of three

adult education/home craft

centres per ward

180M 2013-2017 90 Education

Centres

Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Eletrification of all primary

schools

20M 2013-2017 400 Schools Conduct site

visits/Reports

County Government of

Baringo

County

Government of

Baringo/donors

New

Employment of ECDE

teachers

800M 2013-2017 1200 ECDE

teachers

Reports County Government of

Baringo

County

Government of

Baringo

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 249

Governance, Justice, Law and Order Sector

Environment, Water, Irrigationand Sanitation Sector

Project Name Cost

Estimate

(KES.)

Time

Frame Monitoring Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Drilling and Equiping of

171 boreholes

1.2B

2013-2017 No of boreholes drilled and equipped

No. of people accessing piped/potable

water

Site visit

Progress

report

GOK, BCG &

Donors

County Govt/donors New/ongoing

Construction of four

Masonary tanks per sub-

county 200M3

60M 2013-2017 No.of tanks constructed and connected

to water

Site visit GOK, BCG &

Donors

County Govt/donors New

Construction of two water

pans/dams per ward per

year

1.5B 2013-2017 No of waterpans constructed in five

years

Number of people and livestock

accessing water

Site visit GOK, BCG &

Donors

County Govt/donors New

Protection of 20 water

springs across the county

as listed in the Annex 4

40M 2013-2017 No of Protected Water Springs Site visit,

Reports

GOK, BCG &

Donors

County Govt/donors New

Project Name Cost

Estimate

(KSh.)

Time Frame

Monitoring Indicators

Monitoring

Tools

Implementing

Agency

Source of

funds

Implementation

Status

Construction of one magistrate court per

sub county

90M 2013-2017 Noof Magistrate courts

Site visit The Judiciary Judiciary &

County Govt

New

Construction of Chief's Office 12 M 2013 – 2017 No ofChief's office Site visit GOK & BCG County&

National Govt

New

Construction of Adminstation Police and

Regular Police post

200M 2013-2017 No of regular police and

AP posts

Site visit GOK, BCG County&

National Govt

New

Construction of prisons/cells 150M 2013-2017 No.of prisons/cells

constructed

Site visits GOK,BCG County &

National Govt

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 250

Project Name Cost

Estimate

(KES.)

Time

Frame Monitoring Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Desiliting of 55 dams and

pans as listed in the Annex

4

200M 2013-2017 No of Desilted water dams/pans Site visit,

Reports

GOK, BCG &

Donors

County Govt/donors New

Construction of model tree

nursery one per sub-county

30M 2013-2017 No of Operational tree Nurseries Site visit GOK, BCG &

Donors

County Govt/donors New

Soil erosion control 100M 2013-2017 Size of area protected Site visit GOK, BCG &

Donors

County Govt/donors New

Establishment of Sewerage

system within Major towns

25B 2013-2017 No. Sewerage established Reports GOK,BCG,&

Donors

GOK,BCG,&

Donors

New

Improve Charcoal

production methods

20M 2013-2017 No of trainings held on charcoal

production.

Site visit GOK, BCG &

Donors

County Govt/donors New

Environment protection 100M 2013-2017 No of seedlings planted/acerage

reclaimed

Reports/Site

visits

BCG/Doners/Central

Government/Private

sector

BCG/Doners/Central

Government/Private

sector

Ongoing/New

Chemususu dam 3B 2013-2017 No of household accessing piped water Reports GOK, BCG &

Donors

GOK,BCG,&

Donors

Ongoing

Ground Catchment

Rainwater Harvesting

structures

100M 2013-2017 No of runoff constructed Reports CGB GOK,CGB,&

Donors

Ongoing

Water supply systems to

households

7B 2013-2017 No of household connected with piped

water

Reports,

site visits

CGB GOK,CGB,&

Donors

Ongoing

Development of dump

sites

30M 2013-2017 No of dump sites developed Reports

Completion

certificate

CGB GOK,CGB,&

Donors

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 251

Project Name Cost

Estimate

(KES.)

Time

Frame Monitoring Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Construction of check

dams

20M 2013-2017 No of check dams constructed Reports CGB GOK,CGB &

Donors

New

Carbon Credit Grading 5M 2013-2014 Percentage of carbon credit returns to

the county

Carbon credit

report

CGB GOK/CGB&

Donors/Companies

New

General Economics, Industrialization, Commerce, Tourism and Enterprise Development.

Project Name Cost

Estimate

(KSh.)

Time Frame Monitoring

Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Tourism

Development of the Tourism Sector

Plan and Site Management Plans for

all key tourism facilities

10M 2013-2017 Development

Sector Plan

Report on the

plan

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Reclaimation of Lake Kapnarok Game

Reserve

400M 2013-2017 Area

reclaimed

Number of

tourists

Site vits &

repports

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Development of Niche Products and

Services

30M 2013-2017 Identify &

establish

Niche

products

Report on the

products

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Asset Preservation and Conservation 5M 2013-2017 Preservation

of

conservation

areas

Site visit &

reports

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Capacity Development 10M 2013-2017 Carry out a

survey

Reports & site

visits

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 252

Project Name Cost

Estimate

(KSh.)

Time Frame Monitoring

Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Expansion of the Tourist Information

Centre at Mogotio

10M 2013-2017

Building

Site visit GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Establishment of Touristic

Monuments and Cultural

Development Centres in each sub

county

36M 2013-2017 6 monuments

& cultural

centres

Site visit GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Acquisition of Courtesy Buses

50M 2013-2017

5buses

Site visit GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

County Branding

50M 2013-2017 County

profiles

Reports GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Livelihood Projects

20M 2013-2017 Reduced

conflicts &

improved

standards of

living

Site visit &

reports

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Markets, JuaKali Sheds and Livestock

Auction Yards one per ward

500M 2013-2017

Sheds & yards

Site visit GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Upgrading of the Barwessa,

Kabartonjo, Chemolingot, Nginyang,

Marigat, Mochongoi, Mogotio,

Torongo, Emening, Eldama Ravine,

Mogorwo, Kabarnet and Oinomoi

Markets

26M 2013-2017

13 markets

Site visit GOK,

CGB&Donors

County Govt/Donors/National

Govt

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 253

Project Name Cost

Estimate

(KSh.)

Time Frame Monitoring

Indicators

Monitoring

Tools

Implementing

Agency

Source of funds Implementation

Status

Construction of 2 Jua Kali / Industrial

Sheds at each subcounty

120M 2013-2017

12 industrial

sheds

Site visit GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Joint Trade Loans Programme

in the whole county

60M 2013-2017 Availability of

trade loans

Report & Site

visit

GOK, CGB&

Donors

County Govt/Donors/National

Govt

New

Industrial Investment

Joint PPP Investment in 2 Value

Addition Factories per Sub-County

through BIC with local cooperatives /

investors

2.4B 2013-2017

12 joint PPP

Report Site

visit

GOK, CGB&

Donors

County Govt/National

Govt/Private Sector

New

Development of Minerals Resource

Map

10M 2013-2017 1 resource

map

established

Report GOK, CGB&

Donors

County& National Govt New

Energy, Transport, Infrastructure and ICT

Project Name Cost Estimate (KSh.) Time Frame Monitoring

Indicators

Monitoring Tools Implementing

Agency

Source of funds Implementation

Status

Construction of

Urban Roads

200M 2013-2017 50 KM of

road

constructed

Report& Site visit GOK, CGB&

Donors

County

Government/National

Govt/Donors

New

Construction of

Gravel Roads

600M 2013-2017 600 KM of

gravel

constructed

Report &Site visit GOK, CGB&

Donors

County

Government/National

Govt/Donors

New

Construction of Earth

Roads and

2.4B 2013-2017 1200 KM of

earth road

report &Site visit GOK, CGB &

Donors

County

Government/National

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 254

Project Name Cost Estimate (KSh.) Time Frame Monitoring

Indicators

Monitoring Tools Implementing

Agency

Source of funds Implementation

Status

Footbridges constructed Govt/Donors

Development and

rehabilation of Air

Strips

600m 2013-2017 Lenght of

run way

constructed

and fenced

report &Site visit GOK,CGB&

Donors

County

Govt/Donors/National

Govt

New

Ongoing

Establishment of ICT

Centres

120M 2013-2017

Development of

Geographical

Information

System[GIS]

50M 2013-2017

Automation of

County Government

processes and

services

30M 2013-2017

Digitization of

County Government

documents

50M 2013-2017

Establishment of

Communication

Masts

2013-2017 PPP/BCG

Solarenergy

exploration

30,M 2013-2017

Rural Electrification 1B 2013-2017 Rural

Electrification

Authority/BCG

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 255

Land, Housing, Public Worksand Urban Development Project Name Cost

Estimat

e (Ksh.)

Time

Frame

Monitoring

Indicators

Monitoring

Tools

Implementing

Agency

Sources of funds Implementat

ion Status

Development of 50 High

Grade Housing for Civil

Servants Housing

Scheme

200M 2013-2017

Number of HGH

constructed

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/Private

sector/National

Government/Donors

New

Development of 75

Medium Grade Housing

for Civil servants

225M 2013-2017

Number of MGH

constructed

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/Private

sector/National

Government/Donors

New

Development of 100

Low Grade Houses for

civil servants

250M 2013-2017

Number of LGH

constructed

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/Private

sector/National

Government/Donors

New

Slum upgrading in Urban

Centres

100M 2013-2017

Number of slums

upgraded

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/Private

sector/National

Government/Donors

New

Construction of county

lands office

20M 2013-2017

County Lands

office constructed

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/National

Government/Donors

New

Development of spatial

plan

160M 2013-2017

County Spatial

Plan

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/National

Government/Donors

New

Urban physical

surveying and

Development

60M 2013-2017

Number of Urban

physical plans

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/National

Government/Donors

New

Land demarcation/ Land

Adjudication and

Registration

50M 2013-2017

Number of title

deeds issued and

number of lands

registers

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/National

Government/Donors

New

Rehabilitation of county

housing facilities

100M 2013-2017

Number of houses

rehabilitated

Work plans/Site visit

meeting and reports

CGB and Private

sector

CGB/National

Government/Donors

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 256

Finance and Planning Sector

Project Name Objective Actual Sub

County/

Ward

Project

cost

(Kshs.)

Source of Funds Time

Frame

Implementing

Agency (ies)

Monitoring

Indicators

Means of

Verification

Implementation

Status

Public Participation To entrench

public

participation in

county

governance

Countywide 65M CGB/National

Government

2013-2017 Planning and

finance

Civil societies

Private sector

Number of

fora

Number of

bulletins

issues

Registers,

reports

Filed copies

Ongoing

Resource Mobilisation Increase county

revenue for

programmes and

projects

County 50M County Government

2013-2017 Planning and

finance

Donors

Research and

learning

institutions

Number of

fora, reports,

No. of trade

fairs and No.

of partnership

engagements

Registers,

reports,

records,

agreements

and contracts

Ongoing

Planning units To ensure

harmony and

linkages between

existing plans,

funding and

programme

implementation

County wide 150M Donors and County

Government

2013-2017 Planning and

finance

No. of review

meetings, No.

reports

No. of offices

No. of staff

Review

reports,

completion

certificate

staff returns

and

performance

contracts

Ongoing

Integrated Financial

Management

Information System

To enhance

efficient financial

services

County wide 30 M County

Government/Donors

2013-2017 Planning and

finance

Donors

No. of

treasuries

established,

staffed and

equipped

Operation

levels, ICT

levels, staff

returns and

performance

contracts

Ongoing

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 257

Project Name Objective Actual Sub

County/

Ward

Project

cost

(Kshs.)

Source of Funds Time

Frame

Implementing

Agency (ies)

Monitoring

Indicators

Means of

Verification

Implementation

Status

Integrated Monitoring

and Evaluation Unit

Tracking

programme and

project

results/trends

Sub Counties 135 M Donors and County

Government

2013-2017 Planning and

finance

Donors

Private sector

Civil societies

No. of fora,

No. of

feasibility and

field reports

No of vehicles

purchased

Registers,

records, case

studies and

reports

Ongoing

Community

empowerment

Increase

efficiency and

development

impact of

devolved funds

County 60M Donors and county

Govt and GOK

2013-2017 Finance and

planning Donors

Community

No of

trainings

Attendant

registers and

reports

Ongoing

Procurement of ICT

materials, infrastructure

and equipment

To increase

efficiency in

service delivery

To create a

platform for

service delivery

County 200M County Govt, GOK,,

Donors

2013-2017 Finance and

planning

No of ICT

materials

procured

Reports Ongoing

Youth, Social Protection, Culture and Recreation

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

Youth Enterprise

Development fund Sub

County scheme

30M 2013-2017 No of youth groups

benefitted

Quarterly

Reports

County Govt

GOK

County Govt, GOK,

Donors, NGOS

Ongoing

Youth Enterprises

Development Funds

Financial intermediary

scheme

100M 2013-2017 No of youth benefited Quarterly

ReportsField

visits

County Govt

GOK

County Govt, GOK,

Donors, NGOS

Ongoing

Youth Polytechnic 300M 2013-2017 No of youth TrainedNo Reports County Govt County Govt, GOK, Ongoing

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 258

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

training programmes of equipment purchased GOK Donors, NGOS

Children‘s programmes 180M 2013-2017 No of meetings held.

No of children desk

created in police

stationsNo of OVC

supported

Minutes

No of cases

reported in

police station

Reports

County Govt

GOK

County Govt, GOK,

Donors, NGOS

Ongoing/New

Area Advisory Council 10M 2013-2017 No of meetings held.

Minutes

County Govt

NGOs

County Govt

NGOs

Ongoing

Youth Empowerment

Centres

(county wide)

300M 2013-2017 No of youth centres

constructed and equiped

Reports County Govt

GOK, Donors, NGOs

County Govt

GOK, Donors, NGOs

Ongoing/New

Women Enterprise

Development Fund

60M 2013-2017 No of women groups

funded

Reports GOK, County Govt

County Govt

GOK, Donors, NGOs

Ongoing

PWSD –CT Program 201M 2013-2017 No of PWSD-CT

benefited

Reports GOK, County Govt

Donors, NGOs

GOK, County Govt

Donors, NGOs

Ongoing

Cash transfer for the

Older persons (65 yrs

and above)

540M 2013-2017 No of beneficiaries Reports GOK, County Govt

Donors, NGOs

GOK, County Govt

Donors, NGOs

Ongoing

Grants to Community

initiatives

36M 2013-2017 No of groups benefited Reports

Field visits

County Govt

County Govt

New

Formation of Technical

committee/sub-counties

and county

1.8M 2013-2017 No of meetings Minute GOK, County Govt

Donors, NGOs

GOK, County Govt

Donors, NGOs

Ongoing

Capacity building 12M 2013-2017 No of trainings held Reports GOK, County Govt

Donors, NGOs

GOK, County Govt

Donors, NGOs

Ongoing

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 259

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

Construction of dining

hall and general

refurbishment at CCSP

Marigat

30M 2013-2017 No of Dining Halls Field Visit

Photographs

GOK, County Govt

Donors, NGOs

GOK, County Govt

Donors, NGOs

Ongoing

Construction and

Equipping of sub-county

Gender and Social Dev.

Offices at Marigat, East

Pokot, Baringo North

and Mogotio

66M 2013-2017 No of offices built Completion

certificate

Photographs

GOK, County Govt

GOK, County Govt

New

Refurbishment of

houses, road repair, rain

water harvesting at

Kabarnet V/R Centre

36M 2013-2017 No of refurbished

houses

Site reports,

pictures

GOK, County Govt

GOK, County Govt

New

Establishment of cultural

Centres

22.5M 2013-2017 No of cultural centres

established

Completion

certificates,

Field reports

GOK, County Govt

GOK, County Govt

Ongoing

Conservation and

preservation of cultural

sites

12M 2013-2017 No of cultural sites Fields Reports County Govt

County Govt

Ongoing

Upgrading of Kabarnet

Stadium to 10,000 seater

National stadia Board

standard and construct

an athletics camp therein

and other Stadias

500M 2013-2017 No offully operational

stadium

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Upgrading to completion

Sirwa Sports Training

Camp

100M 2013-2017 No of operational

Training Camps

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

Ongoing

Construction of one

youth Empowerment

60M 2013-2017 No of Youth

Empowerment Centres

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 260

Project Name Cost Estimate

(KSH)

Time

Frame M &E Indicators

M&E Tools Implementing

Agency

Source of funds Implementation

Status

Centre per sub county

Establishment of one

children's home per sub

county

120M 2013-2017 No of Operational

Children's home.

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Improvement of 1 sports

facilitiesper sub county

60M 2013-2017 No sports facilities

repaired

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Establishment of a

County Youth Enterprise

Fund

120M 2013-2017 No of beneficiaries Report GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Establishment of 1

Social Halls per Sub-

County

60M 2013-2014 Noof Social Halls

constructed

Site visits and

Reports

CGB & Donors Govt/ County

Govt/Donors

New

Establishment of a

County Women

Enterprise Fund

120M 2013-2017 No of women receiving

loans

Report GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Construction of a

Disaster Response

Centre in Kabarnet with

satelites in Chemolingot

and Marigat

100M 2013-2017 No of disaster response

centers.

Report & Site

visit

GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

Construction of

SixPublic Cemeteries

12M 2013-2017 No of public cemeteries

rehabilitated

Site visit GOK, CGB & Donors Nat. Govt/ County

Govt/Donors

New

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 261

SUMMARIZED BUBGET FOR THE CIDP 2013-2017

SECTOR AMOUNT (KES in Billions)

Health 6.770

Education 5.638

Environment ,Water,Irrigation And Sanitation 38.405

General Economics,Industrilazation,Commerce,Trade,Tourism And Enterprise Development 3.737

Energy,Transport,Infrastructure And Ict 5.08

Land,Housing,Public Works And Urban Development 1.165

Agriculture,Livestock And Fisheries 13.871

Finance And Economic Planning 0.49

Youth,Social, Culture, And Recreation 3.1881

Governance,Justice Law And Order 0.452

Contingencies 4

TOTAL 82.7961

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 262

Annex I: The County Fact Sheet

The fact sheet presents a summary of key statistics that describe the county at a glance. Data

was derived from the Kenya National Bureau of Statistics reports as well as report from

various Government departments in the county and SIDC and other publications like Kenya

Integrated Household Budget Survey and Kenya Demographic Health Survey.

Information Category Statistics

County Area:

Total area(Km2) 11015.3

Water mass(Km2) 165

Gazetted Forests(ha) 65280.4

National Parks/Reserves(Km) 113.5

Arable land (ha) 1095

Non-arable land(ha) 9920.5

Total urban areas 6

No. of towns 6

Topography and climate

Lowest altitude (above the sea level) (m) 300

Highest 2400m

Temperature range: (00C)

High 47

Low 15

Rainfall:(mm)

High 1500

Low 600

Average relative humidity

Wind speed 4mph SE

Demographic profiles

Total Population (2012) 613,376

Total Male population 308,124

Total female population 305,252

Sex ratio 1:1

Projected population: 2

Mid plan period (2015) 677,209

End of 2017 723,411

Infant population:

Female 10,240

Male 10,834

Total 21,074

Population under five:

Female 59,234

Male 62,638

Total 121,872

Pre-school population (aged 3-5 years)

Female 1,6193

Male 1,7431

Total 33,624

Primary school age group (aged 6-13 years):

Female 76,709

Male 80,803

Total 157,513

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 263

Information Category Statistics

Secondary School age group (14 & 17):

Female 30,797

Male 33800

Total 64,598

Youths population (aged 15-29)

Female 84,242

Male 83,254

Total 167,497

Labour force:( aged 15-64)

Female 149,727

Male 146,202

Total 295,928

Reproductive age group (aged 15-49) 133,685

Aged group Female 10,240

Male 10,834

Total 21,074

Eligible voting population (aged 18 and above) Male 119,266,

Female 126144

Total Registered voters:

Male 87128

Female 84216

Total 171344

Urban Population (2012)

Female 30,373

Male 28,467

Total 58,840

Rural Population:(2012)

Female 274,879

Male 279,657

Total 554,526

Population density: 2012

Highest (Baringo Central 121

Lowest/least (East Pokot) 31;

County average 55

County National

Crude Birth rate 35/1000 38.4/1000

Crude Death rate 10.7/1000 10.4/1000

Infant Mortality rate (IMR) 58/1000) 54/1000

Neo-Natal Mortality Rate (NNMR) 31/1000

Post Neo-Natal Mortality Rate (PNNMR) 21/1000.

Maternal Mortality Rate (MMR) 375/100,000 495/100,000

Child Mortality Rate (CMR) 12/1000. 24/1000

Under Five Mortality Rate (U5MR) 70/1000. 79/1000

Life expectancy

Males

Females

54

59

58

61

Total number of households 11,0649 8,767,954

Average household size 5 4.4

Female headed households 10794 2,818,800

Children needing special protection:

Children in labour Not determined

Orphans Not determined

Physically disabled persons (No.) 6998.

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 264

Information Category Statistics

Distribution of Population by disability type (per

cent):

Missing: County National

Hand: 0.001

Foot: 0.005

Lame 0.854 0.249

Visual 0.790 0.141

Hearing 0.59 0.122

Speech 0.24 0.253

Physical 0.99 0.102

Mental 0.27 0.058

Self care

Other types of disabilities 0.19 0.075

Child- Headed households (per cent) 3

Poverty Indicators

Absolute poverty:

Percentage 58.5

Number 325,000

Contribution to national poverty 1.5

Urban poor:

Percentage 20

Number 30737

Rural poor:

Percentage 57.4

Number 318892

Food poverty:

Percentage 57

Number 316,669

Income per capita Not Determined

Sectoral contribution to household income (per cent):

Agriculture 80

Rural self-employment 15

Wage employment 18.9

Urban self-employment 22.4

Number employed per Sector:

Agriculture 372,225

Rural self-employment 102,743

Wage employment 95,352

Urban self-employment 65,800

Crop farming:

Average farm size (Small scale) 1.5ha

Average farm size (Large scale) 5ha

percentage of farmers with title deeds 35

Total acreage under food crops 9000 ha

Total acreage under cash crops 10 Ha

Total acreage under soil/land conservation 180,000ha

Total acreage under farm forestry Not determined

Total acreage under organic farming Not determined

Main storage facilities Granaries

Livestock farming:

Number of Ranches

Company ranches 0

Group ranches 2

Total 2

Average size of ranches 20986ha

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 265

Information Category Statistics

Main livestock bred East African Zebu, Goats, Dairy animals, pigs, sheep, Rabbits,

Camels.

Land carrying capacity 5

Total Number of Ranches 4

Beekeeping apiaries 1

Bee hives 176,880

Milk production:

Quantity litres per anum 6.1 million

Value Ksh. 12,200,000

Beef production:

Quantity kgs per anum 7.4million

Value Ksh. 22.2 m

Mutton Production:

Quantity (kgs per anum) 90,050 Kg

Value Ksh. 28.816m

Egg production:

Quantity (tons) 62000

Value (Ksh) 620,000

Poultry meat Production:

Quantity (kg) 35000

Value (Ksh) 10,500,000

Honey Production:

Quantity (kg) 51,000

Value (Ksh) 40.8m

Pork Production:

Quantity (kg) 51200

Value (Ksh) 17.92m

Fisheries production:

Fishermen (No.) 150

Fish farm families (No.) 150

Fish ponds 610

Area of fish ponds 184,000m2

Main species of fish catch:

Protopterous -lung fish (tonnes)

Tilapia

Clarias

154

12

27

Fishing Effort (hours) 4

Landing beaches (No.) 0

Fishing gear (No.):

Fishing nets: 900

Hooks: 190,000

Traps: 50

Motor Boats: 3

Dhows 0

Canoes 3

Fish harvest:

Weight (tons) 193

Value (Ksh) 11.8m

Wildlife Resources

Animal types Elephants, Buffaloes, Girraffes, Gazzelles, Leopards

Wildlife estates-private, Ruko Conservancy, Kuki Galmans Nature Conservancy, Mesori

Community Ostrich Farm,Kerubo Swamp, Kiborgoch, Tiongik

Nature Conservation, Ngenyin Community Conservation, Soy safari

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 266

Information Category Statistics

lodge, songol Ranch, KDA Chemeron Ostrich farm, salabani

secondary school chuine sanctuary, Equator tortoise park, Irong

conservancy, Temberewe Ostritich farm, Lembus chemogoch

Kaptuiya wildlife conservancy, michongoi community Nature

reserve Reserve, Lake Kichitit Wetland conservation and Lomoiwe

Game Nature

game management,( National parks/Reserves)

Indicate the total areas under Protected Areas

List any threatened species ( animals, birds etc) in

the county

Nature and frequency of human wildlife conflicts

No. of Park visitors per annum

No protected area.

No animals in national category is endangered species

Snake Bites and crocodile attacks on both human and livestock.

Not determined.

Not determined.

Staff of KWS, camps 4

Poaching control measures:

Indicate the number of poachers arrested

Indicate the number of firearms confiscated

Nil

-Nil

Forestry

List tree species of biodiversity importance

Rate of forest loss and main causes

Saddle wood, cedar, podo, prosopis juliflora, Eucaliptus saligna,

Grevillea Rabusta and Cupressus lusitanica

15 per cent causes are; human encroachment, charcoal burning,

poverty.

Number of gazetted forests 7

No. of Non-gazetted forests Not determined

Size of gazetted forests 65,280.4Ha

Main forest products & quantities Timber, firewood, poles, charcoal, honey.

No. of people engaged in forestry 12,000

Seedlings production

400,000

Farms engaged in farm forestry (plots) 104

Average no. of trees per farm 100

Non-timber forest products harvested (Ksh) 10m

Community Forest Associations (CFA) established 4

Quantity of timber produced (000,000) 6m

ENVIRONMENT

Pollution

main type of pollution and their sources

EIAs endorsed (No.)

Noise

I51

Environment Audits executed: 51

Solid waste management

Quantity of solid waste (tons p.a)

Sources of solid waste

Indicate numbers per location

Garbage and human waste

10,950

Towns, Markets and Residential areas

Hill tops and slopes and mountain areas protected: Nil

Rivers, lakes and wetlands protected:

Total freshwater available

Distribution of water uses according to main water

users

No. of Water Resource Users Associations

No. of water permits per category

No. of rivers with environmental flows

Not determined

Not determined

7

Not determined

380

0

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 267

Information Category Statistics

No. of ground water sources

Proportion of house with roof catchment

400

0

Number of quarry sites renovated: 0

Mines, mineral, Quarrying and estimate quantities

Mining activities:

Mineral Type 0

Lifespan N/A

Quarrying:

Sand Not determined

Ballast Not determined

Murram/gravel Not determined

Hardcore Not determined

No. of people involved Not determined

Cooperatives

No. of cooperative societies 71

Active cooperative societies 71

Dormant cooperative societies 31

Collapsed societies (No.) N/A

Total Registered membership 42264

Total turn-over (Ksh) 696,560,545

Health

Number of health posts:

Hospitals (Public)

Provincial Nil

County 1

Sub-county 4

Hospitals (Mission/NGO) 1

Hospitals (Private) 1

Nursing homes (Private) Nil

Health centres (Public) 19

Health centres (Private) 0

Dispensaries (Public) 156

Dispensaries (Mission/NGO) 4

Private clinics 10

Beds capacity:

Public Health Facilities

Provincial Hospitals 0

County Hospital 160

Sub-county Hospitals 105

Total (Public facilities)

180

Mission/NGO Health facilities:

Hospitals 1

Health Centres 2

Dispensaries 2

Clinics 0

Total Mission facilities 5

Private health facilities:

Hospitals 1

Health Centres 2

Nursing homes Nil

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 268

Information Category Statistics

Dispensaries 2

Clinics

15

Total (Private Health) facilities

Community distribution by Distance to the nearest

Health facility (per cent)

0 – 1 KM 5

1.1 – 4.9KM 15

5KM and more 80

Average distance to health facility 15km

Doctor/population ratio 1:57,381

Nurse/ population ratio 1:4906

HIV prevalence 4.3

Children vaccination (per cent) 85

Contraceptive acceptance (per cent of women over

18)

7.5

Antenatal care (ANC) 45

Place of Delivery (per cent of children under 5

delivered) in:

Hospital 47.3

Health Centre 19.7

Dispensary/clinic 1.2

Maternity home per cent children

under 5 delivered at M/home

2.9

per cent children under 5 delivered

at home at home

58

Health facility deliveries (per cent) 34

Delivery Assistant (per cent):(children under 5)

Doctor 14.0

Midwife/nurse 25.2

TBA 53.2

Trained TBA 6.0

Self 4.1

Other 16.0

Morbidity Rates (per cent):(population by incidence

of sickness)

Male 35.7

Female 40.3

Total (County 38.0

Malaria Control:

Children under 5 who sleep under

bed net (per cent) (children U-5 who

sleep under treated bed net)

Untreated net 26

Treated net 28

Five most prevalent diseases per cent) (cases

reported)

Malaria/fever 14.1

Diarrhoea 1.9

Stomach-ache 4.7

Respiratory Diseases

Upper 0.9

Lower 3.5

Flu, etc 50.5

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 269

Information Category Statistics

Education

Pre-school:

No. of ECD centres 678

No. of ECD teachers 1446

Teacher/pupil ratio 1:27

Total enrolment Male

Female

Total

County

24130

20891

45021

National

2247272

Gross enrolment Rate 108.96 62.6

Net enrolment Rate (per cent) 99 41.8

Drop-out rate .0.5

Average years of attendance

Completion Rate

6 years

97

Retention Rate 99

Transition Rate 96

Primary school:

Number of primary schools 656

Number of teachers 5367

Teacher/pupil ratio

1:25

County National

Total enrolment Male

Female

Total

71,508

71,509

143,017

9,433,493

Gross enrolment Rate 97 110.8

Net enrolment Rate 95 77.2

Drop-out rate 3

Average years of attendance

Completion Rate

5

97

Retention Rate per cent 97

Transition Rate per cent 60

Communities‘ distribution by distance to nearest

public primary school (per cent):

0 – 1KM 80

1.1 – 4.9KM 19

5KM and more 1

Secondary schools:

Number of secondary schools 125

Number of teachers 878

Teacher/pupil ratio

1:26

County National

Total enrolment Male

Female

Total

15,200

12,174

27,374

1,798,587

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 270

Information Category Statistics

Gross enrolment Rate (per cent) 41 51.4

Net enrolment Rate 68 24.0

Drop-out rate

Average years of attendance

Completion Rate

15

Retention Rate 68

Communities distribution by distance to nearest

public Secondary school (per cent):

0 – 1KM 8

1.1 – 4.9KM 82

5KM and more 10

Tertiary institutions:

Public Universities (No.) Nil

Private Universities (No.) Nil

University Campuses/colleges (No.) 1

National Poly techniques 0

Science & Technology Institutes (No.) 1

Other Public Colleges (No. by type) 3

Youth Poly techniques 12

Private Accredited colleges by type 3

Private Non accredited college by type 0

Literacy: (Population aged 15+)

Ability to read:

Can Read (per cent) 34.5

Cannot read (per cent) 66.5

Ability to write:

Can write (per cent)

Cannot write (per cent)

Ability to read and write:

Can read and write (per cent)

Cannot read & write (per cent)

Water and sanitation

Households with access to piped water 7108

HH with access to potable water 495

Number of permanent rivers 11

No. of shallow wells 5022

No. of protected springs 80

No. of un-protected springs 84

No. of water pans 102

No. of Dams 143

No. of Bore holes 1545

HH with roof catchment systems 94

Mean distance to nearest water point 5Km

Households distribution by time taken (minutes, one

way) to fetch drinking water(per cent)

0 0

1 – 4 mins 6

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 271

Information Category Statistics

5 – 14 mins 8

15 – 29 mins 10

30 – 59 20

60+ 46

Number of Water Resource User Associations

(WRUA) Established

3

Households with Latrines (per cent) 14.3

County National

Distribution of Households by Main Source of water

(%)

Piped into dwelling

Piped

Rain/harvested

Borehole

Protected well

Protected spring

Unprotected well

Unprotected spring

Stream

Jabias

Water Vendor

Pond

Dam

Lake

Others

Community distribution by type of main toilet

facility (per cent):

1.7

12.3

0.3

6.9

2.0

2.7

5.4

3.8

52.2

0.1

1.1

2.2

4.2

2.1

3.1

6.9

23.1

0.8

11.0

7.4

7.0

5.7

4.4

21.6

0.3

6.5

2.1

2.0

1.1

0.3

Flush toilet 0.061

VIP Latrine 3.8

PIT Latrine/ 46

Uncovered Pit Latrine/

Covered Pit Latrine

Bucket 0.0179

Other 49

None 1

Community distribution by type of waste/garbage

disposal (per cent):

Collected by local Authority 0.5

Collected by Private firm 0

Garbage pit 2

Burning 0

Public garbage heap 97

Farm Garden 0.5

Neighborhood Community group 0

Energy

Trading centers with electricity 104

Trading centers without electricity 56

Health facilities with electricity 20

Health facilities without electricity 140

Secondary Schools with electricity 37

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 272

Information Category Statistics

Secondary Schools without electricity 88

HH distribution by main cooking fuel (per cent): County National

Electricity 0.2 0.8

Gas (LPG) 0.5 5.0

Biogas 0.3 0.7

Solar 0.0 0.1

Paraffin 1.0 11.6

Firewood 86.4 64.6

Charcoal 11.4 16.9

Other 0.1 0.3

HH distribution by main lighting fuel, (per cent).

Electricity 9.6 22.7

Solar 1.7 1.6

Gas Lamp 0.7 1.0

Pressure Lamp 0.4 0.6

Lantern 39.3 30.5

Tin lamp 20.1 38.5

Fuel wood 27.8 4.5

Others 0.4 0.7

Households distribution by cooking appliance

type:(per cent)

Traditional stone fire 49.7

Improved traditional stone fire 21.4

Ordinary Jiko 11.5

Improved Jiko 8.6

Kerosene Stove 6.2

Gas Cooker 1.8

Electric cooker 0.4

Other 0.4

Institutions (schools, hospitals, prisons, etc.) using

improved wood-fuel cooking stoves

70

Institutions (schools, hospitals, prisons, etc.) using

LPG

NIL

Institutions (schools, hospitals, prisons, etc.) using

kerosene

Not determined

Institutions (schools, hospitals, prisons, etc.) using

solar energy

50

Institutions (schools, hospitals, prisons, etc.) that

have established woodlots

Not determined

Transport & Communication

Road length:(Km)

Bitumen surface 339.22

Gravel surface 2035

Earth surface 557.37

Railway line length 5

Railway Stations 0

Sea/Lake Ports 0

Airports/Airstrips 4

Number of Telephone connections(per cent)

0.375

Mobile network coverage 45

No. of Cyber cafes 15

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 273

Information Category Statistics

No. of private courier services 1

Number of Post offices 9

Number of Sub-post offices 0

Licensed stamp vendors 0

Community distribution by distance to nearest Post

Office(per cent):

0 – 1KM 4

1.1 – 4.9KM 17

5KM and more 79

Wholesale and Retail Trade and Industry

Trading centres (No.) 92

Registered Retail traders (No.) 120

Registered wholesale traders (No.) 2

Industry

Manufacturing industries

Total Production by industries

Total Consumption

Surplus/deficiency

0

0

0

0

Bakeries 3

Juan Kali Associations 5

Juan Kali Artisans 1842

Tourism

Hotels by category:

Five Star 0

Four Star 1

Three Star 1

Two Star 0

One Star 0

Unclassified hotels 4

Bars and Restaurants 40

Hotel Bed capacity by category:

Five Star 0

Four Star 80

Three Star 70

Two Star 0

One Star 0

Unclassified hotels 342

Financial Services

Commercial Banks 5

Micro-finance Institutions 4

Building Societies 0

Village banks 0

Insurance Companies/branches 4

Housing County National

Distribution of Households by Ownership of

dwelling unit (%)

Owner occupied

Rented

83.7

16.3

68.0

32.0

HH distribution by main wall materials( per cent):

Stone 5.1 16.6

Brick/Block 3.7 16.8

Mud/Wood 50.0 36.7

Mud/Cement 6.3 7.7

CIDP COUNTY GOVERNMENT OF BARINGO 2013-2017 Page 274

Information Category Statistics

Wood only 25.8 11.1

Corrugated Iron sheet 6.4 6.6

Grass Straw 1.5 3.2

Tin 0.1 0.2

Other 0.6 0.9

HH distribution by main floor materials (per cent):

Cement 24.8 41.0

Tiles 0.3 1.6

Wood 1.7 0.8

Earth 73.0 56.5

Other 0.2 0.2

HH distribution by main Roofing materials (per

cent):

Corrugated Iron Sheet 58.0 73.2

Tiles 1.0 2.2

Concrete 0.1 3.6

Asbestos Sheet 1.5 2.3

Tin 0.1 0.3

Grass 38.8 13.7

Makuti 0.2 3.2

Mud/dung 0.1 0.8

Other 0.2 0.7

Government houses by category 247

233

44

87

LG

MG

HG

Not Registered/unclassified

Community Development and social welfare

sector

Number of active women groups

Number of community based projects

Number of youth groups

Adult literacy classes

Number of orphans and vulnerable children

2829

203

2183

158

3439