A d d e n d u m Iowa Department of Transportation Date of Letting: April 16, 2013 Office of Contracts Date of Addendum: April 9, 2013 B.O. Proposal ID Proposal Work Type County Project Number Addendum 004 15-0922-036 BRIDGE AND APPROACHES - PPCB CASS BRF-092-2(36)--38-15 16APR004.A01 Notice: Only the bid proposal holders receive this addendum and responsibility for notifying any potential subcontractors or suppliers remains with the proposal holder. Make the following change to the PROPOSAL SCHEDULE OF PRICES: Add Proposal Line No. 0181 2599-9999005 BEARING PAD; 24.000 EACH If the above change is not made, it will be made as shown here. Make the following change to plan sheet number 2: For Item Code 2407-0563120BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTC120, delete the following from the Estimate Reference Information: INCLUDES 24 BEARING PADS. SEE DESIGN SHEET 14 FOR ADDITIONAL DETAILS. IF ADDITIONAL BEARING PADS ARE NEEDED FOR THE CONTRACTORS MEANS AND METHODS OF PREFABRICATED BRIDGE SUPERSTRUCTURE MOVE THEY SHALL BE INCIDENTAL AND NO ADDITIONAL PAYMENT WILL BE MADE. For Item Code 2599-9999005 BEARING PAD, add the following Estimate Reference Information: APPLY SECTION 4195 OF THE STANDARD SPECIFICATIONS. SEE DESIGN SHEET 14 FOR ADDITIONAL DETAILS. IF ADDITIONAL BEARING PADS ARE NEEDED FOR THE CONTRACTORS MEANS AND METHODS OF PREFABRICATED BRIDGE SUPERSTRUCTURE MOVE THEY SHALL BE INCIDENTAL AND NO ADDITIONAL PAYMENT WILL BE MADE. THE METHOD OF MEASUREMENT AND BASIS OF PAYMENT WILL BE FOR EACH BEARING PAD FURNISHED AND PLACED. Make the following change to plan sheet number 9: Replace the following note: THE PRECAST ABUTMENT FOOTING SUPPORT SHALL NOT BE REMOVED UNTIL 4000 PSI COMPRESSIVE STRENGTH HAS BEEN ACHEIVED. With: THE PRECAST ABUTMENT FOOTING SUPPORT SHALL NOT BE REMOVED AND THE PREFABRICATED BRIDGE SUPERSTRUCTURE MOVED UNTIL THE CONCRETE IN THE PILE POCKET VOIDS HAS ATTAINED 4000 PSI COMPRESSIVE STRENGTH. Page 1 of 18

Transcript of A d d e n d u m - Iowa DOT

A d d e n d u m Iowa Department of Transportation Date of Letting: April 16, 2013 Office of Contracts Date of Addendum: April 9, 2013

B.O. Proposal ID Proposal Work Type County Project Number Addendum

004 15-0922-036 BRIDGE AND APPROACHES - PPCB

CASS BRF-092-2(36)--38-15

16APR004.A01

Notice: Only the bid proposal holders receive this addendum and responsibility for notifying any potential

subcontractors or suppliers remains with the proposal holder.

Make the following change to the PROPOSAL SCHEDULE OF PRICES: Add Proposal Line No. 0181 2599-9999005 BEARING PAD; 24.000 EACH If the above change is not made, it will be made as shown here. Make the following change to plan sheet number 2: For Item Code 2407-0563120BEAMS, PRETENSIONED PRESTRESSED CONCRETE, BTC120, delete the following from the Estimate Reference Information: INCLUDES 24 BEARING PADS. SEE DESIGN SHEET 14 FOR ADDITIONAL DETAILS. IF ADDITIONAL BEARING PADS ARE NEEDED FOR THE CONTRACTORS MEANS AND METHODS OF PREFABRICATED BRIDGE SUPERSTRUCTURE MOVE THEY SHALL BE INCIDENTAL AND NO ADDITIONAL PAYMENT WILL BE MADE. For Item Code 2599-9999005 BEARING PAD, add the following Estimate Reference Information: APPLY SECTION 4195 OF THE STANDARD SPECIFICATIONS. SEE DESIGN SHEET 14 FOR ADDITIONAL DETAILS. IF ADDITIONAL BEARING PADS ARE NEEDED FOR THE CONTRACTORS MEANS AND METHODS OF PREFABRICATED BRIDGE SUPERSTRUCTURE MOVE THEY SHALL BE INCIDENTAL AND NO ADDITIONAL PAYMENT WILL BE MADE. THE METHOD OF MEASUREMENT AND BASIS OF PAYMENT WILL BE FOR EACH BEARING PAD FURNISHED AND PLACED. Make the following change to plan sheet number 9: Replace the following note: THE PRECAST ABUTMENT FOOTING SUPPORT SHALL NOT BE REMOVED UNTIL 4000 PSI COMPRESSIVE STRENGTH HAS BEEN ACHEIVED. With: THE PRECAST ABUTMENT FOOTING SUPPORT SHALL NOT BE REMOVED AND THE PREFABRICATED BRIDGE SUPERSTRUCTURE MOVED UNTIL THE CONCRETE IN THE PILE POCKET VOIDS HAS ATTAINED 4000 PSI COMPRESSIVE STRENGTH.

Page 1 of 18

Attached are the following files from the Pre-Bid meeting held April 3, 2013: -Meeting Minutes with a list of attendees -PowerPoint Presentation The following is a link to the visualization file that was shown at the Pre-Bid meeting held April 3, 2013: http://www.youtube.com/iowadot

Page 2 of 18

Prebid Meeting Cass 113 

April 3, 2013 

 

Attendees: Jim Nelson, Gary Novey, George Feazell, Ahmad Abu‐Hawash,  Kurt Estrem, Scott Hanson,  

Kyle Frame, Kimball Olson, contractors 

Scott Hanson and George Feazell: 

Currently – 9 bid holders 

No DBE goal 

October 21st, late start 

Iowa DOT in charge of placing detour 

2 utility lines on north side will be relocated before start date 

 

Jim Nelson: 

Temporary works and prefab bridge move will need PE plan signed and submitted 

SP written for open ended method for moving bridge 

Age of bridge move based on curing (not 28 days) 

Test move required 

Stainless steel sole plate item is subject to deletion if method of superstructure move is changed 

Important to remember sequence of operations on sheet 3 can changed sequentially 

No VE allowed because of nature of demonstration 

Sheet 9 – may need addendum on note for temporary supporting abutment footing for curing 

pile void concrete to 4000 PSI 

Pile void curing likely on critical path 

Orientation of piles is rotated 90 degrees from traditional abutments 

2 sliding pads per beam bearing; 6x2x2=24 brgs 

Contractor Questions: 

Anything off roadway – No working  day charge if no lane closure 

Consider taking bearings out of beam price since method of move is not definite; this would be 

an addendum 

 

 

 

Page 3 of 18

Page 4 of 18

Page 5 of 18

CA

SS 1

13 P

RE-B

ID M

EETI

NG

4/3

/201

3

Age

nda

•W

elco

me,

Intro

duc

tions

and

Inst

ruct

ions

–Sc

ott H

anso

n,

Offi

ce o

f Con

tract

s

•C

ontra

ct A

dm

inist

ratio

n, C

ontra

ct P

erio

d a

nd U

tiliti

es -

Geo

rge

Feaz

ell,

Dist

rict 4

Con

stru

ctio

n En

gine

er

•Pl

ans a

nd S

peci

ficat

ions

Hig

hlig

hts –

Jim N

elso

n, O

ffice

of

Brid

ges a

nd S

truct

ures

•Br

idge

Con

stru

ctio

n V

isual

izatio

n –

Kim

ball O

lson,

Offi

ce

of B

ridge

s and

Stru

ctur

es

Page 6 of 18

PRO

JEC

T LO

CA

TIO

N

•IA

92

over

Sm

all N

atur

al S

tream

, 1.0

mile

wes

t of J

ct.

IA 1

48

Page 7 of 18

PRO

JEC

T LO

CA

TIO

N

Page 8 of 18

EXIS

TIN

G S

TRU

CTU

RE

•40

’ x 3

0’ S

teel

I-be

am•

Con

stru

cted

193

0•

Reco

nstru

cted

194

9•

Ove

rlay

1968

•Re

trofit

rail 1

992

•O

verla

y 19

98

Page 9 of 18

SPEC

IFIC

ATI

ON

S H

IGH

LIG

HTS

•D

S-12

007

Con

stru

ctio

n Pr

ogre

ss S

ched

ule

•D

S-12

020

Stru

ctur

al C

oncr

ete

(450

0 PS

I (31

MPA

) or

Gre

ater

)•

GS-

1200

2 G

ener

al S

uppl

emen

tal S

peci

ficat

ions

for

High

way

and

Brid

ge C

onst

ruct

ion

•SP

-120

041

Pre

fabr

icat

ed B

ridge

Sup

erst

ruct

ure

Mov

e

Page 10 of 18

SPEC

IAL

PRO

VIS

ION

FO

R PR

EFA

BRIC

ATE

D B

RID

GE

SUPE

RSTR

UC

TURE

MO

VE

•De

scrip

tion

•Te

mpo

rary

wor

ks a

nd p

refa

bric

ated

brid

ge su

pers

truct

ure

mov

e sy

stem

shal

l be

des

igne

d b

y a

Prof

essio

nal E

ngin

eer

licen

sed

in th

e St

ate

of Io

wa.

•C

onst

ruct

ion

•Su

bmitt

als s

ectio

n in

clud

es te

mpo

rary

wor

ks, p

refa

bric

ated

su

pers

truct

ure

mov

e an

d g

eom

etry

con

trol p

lan

•A

ge a

t pre

fabr

icat

ed b

ridge

supe

rstru

ctur

e m

ove

•Te

st m

ove

prio

r to

the

actu

al m

ove

day

•D

efle

ctio

n an

d tw

ist c

ontro

l

Page 11 of 18

PLA

N H

IGH

LIG

HTS

•Es

timat

ed B

ridge

Qua

ntiti

es –

shee

t num

ber 2

•Pr

ecas

t Abu

tmen

t Foo

ting

•Pr

ecas

t Win

gwal

ls•

Pref

abric

ated

Brid

ge S

uper

stru

ctur

e M

ove

•G

ener

al N

otes

–sh

eet n

umbe

r 3•

Sugg

este

d C

onst

ruct

ion

Sequ

ence

for C

ritic

al C

losu

re•

Val

ue E

ngin

eerin

g Pr

opos

als

•Su

bstru

ctur

e Pr

ecas

ting

–sh

eet n

umbe

r 4•

Liftin

g an

d H

and

ling

Page 12 of 18

PLA

N H

IGH

LIG

HTS

•A

ltern

ate

Site

Cas

ting

Not

es –

shee

t num

ber 5

•Br

idge

Sta

ging

Pla

n –

shee

t num

ber 8

•W

ithin

the

R.O

.W.

•A

butm

ent D

etai

ls –

shee

t num

ber 9

•Pi

le p

ocke

t con

cret

e m

ix d

esig

n –

4000

psi

rele

ase

stre

ngth

•Pi

les o

rient

ated

for s

trong

axis

ben

din

g –

sem

i-int

egra

l ab

utm

ent.

Page 13 of 18

PLA

N H

IGH

LIG

HTS

•A

butm

ent D

iaph

ragm

Det

ails

–sh

eet n

umbe

r 14

Page 14 of 18

PLA

N H

IGH

LIG

HTS

•Su

pers

truct

ure

Det

ails

–sh

eet n

umbe

r 15

•Bo

nded

PTF

E su

rface

on

bear

ing

pad

det

ail

Page 15 of 18

PLA

N H

IGH

LIG

HTS

•Sl

ab h

aunc

h D

ata

Det

ails

–sh

eet n

umbe

r 18

•V

aria

ble

haun

ch

Page 16 of 18

PLA

N H

IGH

LIG

HTS

•A

butm

ent B

ackf

ill D

etai

ls –

shee

t num

ber 2

6•

Neo

pren

e w

ater

stop

Page 17 of 18

GRA

NT

APP

LIC

ATI

ON

S

1.Hi

ghw

ays f

or L

ife (H

fL) D

emon

stra

tion

Proj

ect

2.SH

RP2

R04

Impl

emen

tatio

n A

ssist

ance

pro

gram

•Bo

th g

rant

app

licat

ions

hav

e be

en su

bmitt

ed a

nd

acce

pted

. To

dat

e w

e ha

ve n

ot b

een

notif

ied

of

awar

d.

•Hf

Lha

s som

e re

quire

men

ts th

at im

pact

the

cont

ract

or,

prim

arily

that

the

gran

t req

uire

s a sh

owca

se.

If w

e ar

e su

cces

sful

in w

inni

ng th

e gr

ant w

e w

ill ha

ve to

ad

dre

ss

this

with

an

add

end

um o

r a c

ontra

ct m

odifi

catio

n.•

SHRP

2 –

No

know

n im

pact

s to

the

cont

ract

or

Page 18 of 18