TITLE Albany Datacenter - High Level Architecture DESCRIPTION Hardware and Virtualization Platforms (10) AIX 7.1 LPARS (3) AIX 6.1 LPARS (19) Red Hat Enterprise Linux 6 VMs (1) Ubuntu Linux VM (3) SUSE Enterprise Linux 11 VMs (1) Red Hat Enterprise Linux 5 VM (2) Windows XP Professional VMs (1) Windows Server 2012 VM (7) Windows Server 2008R2 VMs (3) Windows 7 VMs (1) Centos 4/5/6 VM (17) Oracle Enterprise Linux 7 VMs Power 770 IBM P770 512GB / 16 POWER7 Cores BladeCenter H IBM HS23 Blades 128GB / 12 E5-2630 Cores

Transcript of (10) AIX 7.1 LPARS (3) AIX 6.1 LPARS (10) AIX 7.1 ... - SUNY RF

TITLE Albany Datacenter - High Level Architecture

DESCRIPTION Solaris Environment with Expanded Detail DESCRIPTION Hardware and Virtualization Platforms

(10) AIX 7.1 LPARS(3) AIX 6.1 LPARS(10) AIX 7.1 LPARS(3) AIX 6.1 LPARS

(19) Red Hat Enterprise Linux 6 VMs(19) Red Hat Enterprise Linux 6 VMs(1) Ubuntu Linux VM(3) SUSE Enterprise Linux 11 VMs(1) Red Hat Enterprise Linux 5 VM(2) Windows XP Professional VMs(1) Windows Server 2012 VM(7) Windows Server 2008R2 VMs(3) Windows 7 VMs(1) Centos 4/5/6 VM

(1) Ubuntu Linux VM(3) SUSE Enterprise Linux 11 VMs(1) Red Hat Enterprise Linux 5 VM(2) Windows XP Professional VMs(1) Windows Server 2012 VM(7) Windows Server 2008R2 VMs(3) Windows 7 VMs(1) Centos 4/5/6 VM

(17) Oracle Enterprise Linux 7 VMs(17) Oracle Enterprise Linux 7 VMs

Power 770

IBM P770 512GB / 16 POWER7 Cores

System x3250System x3250System x3250

1 2 3 4 5 6 7 8 9 10 11 12 13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

BladeCenter H

IBM HS23 Blades128GB / 12 E5-2630 Cores

TITLE Utica Datacenter - High Level Architecture

DESCRIPTION Solaris Environment with Expanded Detail DESCRIPTION Hardware and Virtualization Platforms

(28) AIX 7.1 LPARS(6) AIX 6.1 LPARS

QA / Development / Test / DR

(28) AIX 7.1 LPARS(6) AIX 6.1 LPARS

QA / Development / Test / DR

Power 770

IBM P770 512GB / 16 POWER7 Cores

System x3250System x3250System x3250

128GB / 32 SPARC64-VII CoresVirtualized using Solaris 10 Zones:Portal ProductionPortal DevelopmentPortal PatchPortal Test

128GB / 32 SPARC64-VII CoresVirtualized using Solaris 10 Zones:Portal ProductionPortal DevelopmentPortal PatchPortal Test

64GB / 16 SPARC64-VII CoresVirtualized using Solaris 10 Zones:Portal ProductionPortal DevelopmentPortal PatchPortal Test

64GB / 16 SPARC64-VII CoresVirtualized using Solaris 10 Zones:Portal ProductionPortal DevelopmentPortal PatchPortal Test

(6) Windows 10 VMs(9) Windows 7 VMs(1) Windows Server 2003 VM(16) Windows Server 2008R2 VMs(3) Windows Server 2016 VMs(2) Windows Server 2012 VMs(4) Windows XP Professional VMs(1) Red Hat Enterprise Linux 5 VM

(6) Windows 10 VMs(9) Windows 7 VMs(1) Windows Server 2003 VM(16) Windows Server 2008R2 VMs(3) Windows Server 2016 VMs(2) Windows Server 2012 VMs(4) Windows XP Professional VMs(1) Red Hat Enterprise Linux 5 VM

TITLE Legacy Albany Datacenter - High Level Architecture

DESCRIPTION Solaris Environment with Expanded Detail DESCRIPTION Hardware and Virtualization Platforms

SPARC

SPARC ENTERPRISE M5000

XSCF

PSU#2HOT SWAP PSU#3HOT SWAPPSU#0HOT SWAP PSU#1HOT SWAP

DVDCOLD SWAPHDD#1HOT SWAP HDD#3HOT SWAP

HDD#0HOT SWAP HDD#2HOT SWAP

TAPEHOT SWAP

~AC DCSTANDBY

~AC DCSTANDBY

~AC DCSTANDBY

~AC DCSTANDBY

SPARC Enterprise M5000Logical Domains

6180

Sun Storage 6180

VNX 5200

Drive Bay ID:

Box 1 Box 2

Box 3

1 2 3 41 2 3 41 2 3 4 ProLiant

DL380

Gen10

Drive Bay ID:

Box 1 Box 2

Box 3

1 2 3 41 2 3 41 2 3 4 ProLiant

DL380

Gen10

Drive Bay ID:

Box 1 Box 2

Box 3

1 2 3 41 2 3 41 2 3 4 ProLiant

DL380

Gen10

RF Business Applications Cloud Migration and Upgrade Additional ETL Information

• High Level Daily ETL processing flow• High Level Month ETL Processing description• High Level – Current RF Report Environment

Completion of EBS Schedule

Flash copy(Qryside data gets 

built)

HR data gets staged in QRYPRDX(QEHRD tables 

space)

DW OBIEE Security tables and primary stage tables  around 

11.30 PM

Dimensions get built

FACT stage tables  get built

Fact  tables get builtOther Customizations like pre award , committed effort tables get built

Row level security tables load and Reconciliation process runs

OBIEE Prod comes down at 

10.30PM

Reconciliation messages OBIEE PROD upETL Ends Around 4.15 AM 

Everyday

Database Setup Begins

DBA Steps Performed

High Level ETL Processing 

Month End ETL in Production

• On last business day of the month, month end tables are exported and staged.• On first business day of the month, month end tables/data are imported to QRYMEX and month end ETL chain runs for approximately 2 hours.