RABRENCANA ANGGARAN BIAYAUNTUK STANDAR SAMBUNAGN RUMAH DIAMETER 1/2" (PVC/PE)PANJANG 1 S/D 8 MNAMA :I WAYAN YASAALAMAT:Dusun Koripan TengahNOMOR: 205/V/CBA/RABPSB/ 2013

NOURAIAN PEKERJAANVOLUMESATUANHARGA SATUANHARGA TOTALIACCESORIES1TEE/Taping sadel (1,2,3,4) X 1Buah2Double Neplle "1Buah3Plug Kran "1Buah4Sock PVC DL "1Buah5Knee PVC "3Buah6Pipa PE diameter "8Meter7Pipa GWI (slubung) 1,5"1.5Meter8Knee PVC DD "1Buah9V Ring " x "1Buah10Pipa GWI Riser "2.5Buah11Elbow GWI "2Buah12Stop Kran "1Buah13Flug Kran "1Buah14Water Meter "1Buah15Knee GWI "2Buah16Tee GWI "1Buah17Flug GWI "1Buah18Kran Air "1Buah19Seltipe5Roll20Lem PVC1OnsRp1,151,700.00IIONGKOS PASANGRp100,000.00IIILAIN LAIN1Pemeliharaan instalasi SR15%Rp187,755.002Biaya Perencanaan1UnitRp100,000.003Meterai1PcsRp6,000.00IVJUMLAH BIAYARp1,545,455.00PPN 10%Rp154,545.50VJUMLAH BIAYARp1,700,000.50TOTAL BIAYARp1,700,000.50JUMLAHRPRp1,700,000.00

VIMaterial1Pipa PE dia 3/4"5MRp15,500.00Rp77,500.002Pengembalian AspalMRp230,000.000.0

VIIOngkos ongkos1Ongkos gali AspalM"Rp6,000.000.02Onkos gali beton/pasang4M"Rp9,975.00Rp39,900.003Onkos pasang pipa1MRp8,037.06Rp8,037.06Biaya Material + OngkosRp125,437.1VIIIJASA 15%Rp18,815.56IXTOTAL JUMLAHRp144,252.62XPPN 10%Rp14,425.26XITOTAL JUMLAHRp158,677.88KELEBIHAN STANDAR

TOTAL BIAYARp1,858,678Catatan:Pemasangan sambungan rumah yang lebih dari standar di hitung per meter X (kali) standar tabel pengambilanbeton/Pc menjadi tanggungan konsumen

Mengetahui/MenyetujuiDiperiksa OlehDi buat OlehDirekturKabag. TeknikKasie Perenc. Teknik

I GEDE DARSANA, SHI KETUT KARNATA, ST. S.IPIB. KADE ASTAWA, STNIK: 0011NIK: 0018

PIPA DINASPERUSAHAAN DAERAH AIR MINUM KABUPATEN KLUNGKUNGRENCANA ANGGARAN BIAYA PEMASANGAN PIPA TERSIER/PIPA DINASNAMA:ALAMAT:NOMOR: /R.A.B.P.S.B./20

BAHAN BAHAN YANG DISEDIAKAN PERUSAHAAN HARGA SATUANJUMLAH UANGNOMORNAMA BAHANBANYAKNYARPRPIACCESORIESRp0.001Tapping SadelRp28,813.50Rp0.002Double Neplle Diameter 3/4"Rp5,152.50Rp0.003Plug Kran Diameter 3/4"Rp60,458.60Rp0.004Sock PVC DL Diameter 3/4"Rp1,305.00Rp0.005Knee PVC diameter 3/4"Rp20,810.30Rp0.006Pipa PE diameter 1"Rp21,824.75Rp0.007Pipa GWI (slubung) diameter 1,5"Rp24,636.90Rp0.008Knee PVC DD 3/4"Rp1,867.50Rp0.009V Ring diameter 3/4 x 1/2Rp10,579.70Rp0.0010Pipa GWI Riser diameter 1/2Rp22,741.20Rp0.0011Elbow GWI diameter 1/2"Rp19,199.70Rp0.0012Stop Kran diameter 1/2"Rp35,550.00Rp0.0013Flug Kran diameter 1/2"Rp27,450.00Rp0.0014Water Meter diameter 1/2"Rp160,650.00Rp0.0015Knee GWI diameter 1/2"Rp8,820.00Rp0.0016Tee GWI diameter 1/2"Rp5,400.00Rp0.0017Flug GWI daimeter 1/2"Rp3,150.00Rp0.0018Kran Air diameter 1/2"Rp15,300.00Rp0.0019SeltipeRp9,000.00Rp0.0020Lem PVCRp15,750.00Rp0.0021Pengembalian AspalRp0.00JUMLAHRp0.00IIONGKOS ONGKOS1Gali aspalRp0.002Gali betonRp0.003Pasang pipaRp0.004Rp0.005Rp0.006Rp0.007Rp0.00JUMLAHRp0.00

TOTAL MATERIAL : (R.A.B.P.S.B):Rp0.00TOTAL UPAH TENAGA KERJA:(R.A.B.P.S.B):Rp0.00JUMLAH MATERIAL + ONGKOS KERJA:Rp0.00JASA 15% (MATERIAL + ONGKOS KERJA):Rp0.00JUMLAH:Rp0.00PPN 10%Rp0.00JUMLAH BIAYA:Rp0.00

Semarapura............20....Mengetahui/MenyetujuiDiperiksaDibuatDirektur UtamaDirektur TeknikBag.Perenc.Teknik

(I GEDE DARSANA)(I KLETUT NKARNATA,ST.S.IP)(IB KADE ASTAWA, ST.)

KWITANSIPERUSAHAAN DAERAH AIR MINUMKABUPATEN KLUNGKUNG

BUKTI PERSETUJUAN BIAYA PENYAMBUNGAN INSTALASI LANGGANAN B.P.B.I NO 205/V/CBA/RABPSB/ 2013

Berdasarkan hasil penelitian atas persil saudara dengan S.P.L No / / /20 G.D. No / / /20

G.S. No / / /20 R.K.P.NO / / /20 A B I No / / /20

SEBESARRp1,858,678

Terbilang: Satu Juta Delapan Ratus Lima Puluh Delapan Ribu Enam Ratus Tujuh Puluh Delapan RupiahApabila saudara menyetujui sebagai tanda bukti, harap membubuhkan tanda tangan di bawah ini, dan menyerahkan kembali lembar aslikepada kami,dalam 10 (sepuluh) hari, selambat lambatnya tanggal

Catatan : Jika ada pemasangan sambungan rumah yang lebih dari standar di hitung per meter X (kali) standar tabel pengambilan beton/Pc menjadi tanggungan konsumen

Disetujui olehPerusahaan Daerah Air Minum Kabupaten KlungkungDirektur

I WAYAN YASA tglI GEDE DARSANA, SH.

DENAHPERUSAHAAN DAERAH AIR MINUMKABUPATEN KLUNGKUNGGAMBAR SITUASI DAN DENAHNAMA:ALAMAT:NOMOR:///GD.GD/GAMBAR SITUASI KETERANGANPersil/ Calon KonsumenRencana Water Meter