RENCANA/ RELISASI PENGADAAN TA 2009 *
Unit Kerja
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
RIM B (Category 6)
Sub Prject A1 (Category 7)
Sub Prject A2 (Category 8)
Consulting Services (Category 3)
Training, Workshop (Category 4)
RIM A (Category 5)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C
Civil Works (Category 1)
Goods (Category 2)
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
1. Pekerjaan Konstruksi (Civil Works) :
Sub Prject B1/B2 (Category 9)
Status : Januari 2009
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Balai PSDA Cimanuk-Cisanggarung
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 GD 1 Rasionalisasi jaringan hidrologi 134,990,000 15,881 NS
1 CW 1 Perbaikan prasarana sungai 212,000,000 24,941 SW
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1Penyediaan jaringan global berbasis perangkat keras dan lunak
6,000,000
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 346,990,000 40,822TOTAL KEGIATAN I (Loan + Pend) 346,990,000 40,822
TOTAL KEGIATAN II (GOI-PF/APBD) 6,000,000 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,000
1. Pekerjaan Konstruksi (Civil Works) :
RIM A (Category 5)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Goods (Category 2)
4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : April 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
Post Review Mei 2010 Mei 2010 Juni 2010
Post Review Mei 2010 Mei 2010 Juni 2010
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Balai PSDA Citanduy
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 GD 1 Rasionalisasi jaringan hidrologi 285,642,000 33,605 NS
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 285,642,000 33,605TOTAL KEGIATAN I (Loan + Pend) 285,642,000 33,605
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi
1. Pekerjaan Konstruksi (Civil Works) :
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Goods (Category 2)
paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : April 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
Post Review Mei 2010 Mei 2010 Juni 2010
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Balai PSDA Ciliwung - Cisadane
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 GD 1 Rasionalisasi jaringan hidrologi 20,800,000 2,447 NS
1 CW 1 Perbaikan prasarana sungai 350,000,000 41,176 NCB
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1Penyediaan jaringan global berbasis perangkat keras dan lunak
10,800,000
2 Perbaikan prasarana sungai 90,000,000
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 370,800,000 43,624TOTAL KEGIATAN I (Loan + Pend) 370,800,000 43,624
TOTAL KEGIATAN II (GOI-PF/APBD) 100,800,000 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,000
1. Pekerjaan Konstruksi (Civil Works) :
RIM A (Category 5)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Goods (Category 2)
2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : April 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
Post Review Mei 2010 Mei 2010 Juni 2010
Prior Review Kont. I
Juni 2010 Juli 2010 Juli 2010 Agst 2010
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Balai PSDA Citarum
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 GD 1 Pengadaan peralatan laboratorium 65,000,000 7,647 NS2 GD 2 Penyediaan jaringan global berbasis perangkat keras dan lunak 3,150,000 370.59
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1Penyediaan jaringan global berbasis perangkat keras dan lunak
10,800,000
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 68,150,000 8,018TOTAL KEGIATAN I (Loan + Pend) 68,150,000 8,018
TOTAL KEGIATAN II (GOI-PF/APBD) 10,800,000 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
1. Pekerjaan Konstruksi (Civil Works) :
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Goods (Category 2)
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : April 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
Post Review Mei 2010 Mei 2010 Juni 2010
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : Balai PSDA Cisadea - Cibareno
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaan
1 2 3 4 5 6
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
1 GD 1Penyediaan jaringan global berbasis perangkat keras dan lunak
10,800,000 1,271 NS
2
1 Perbaikan prasarana sungai 90,000,000 10,588 SW
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
1 Rasionalisasi jaringan hidrologi 11,500,000
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 100,800,000 11,859TOTAL KEGIATAN I (Loan + Pend) 100,800,000 11,859
TOTAL KEGIATAN II (GOI-PF/APBD) 11,500,000 0
KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :
1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000
3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,000
1. Pekerjaan Konstruksi (Civil Works) :
RIM A (Category 5)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A
Goods (Category 2)
2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi
* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU
** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).
Categary yang tidak ada tidak perlu ditulis
Status : April 2010
Post/ Prior Review
Pengumuman
Pengadaan
Pemasukan
PenawaranEval/ Nego
Penandata-nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
7 8 9 10 11 12 13
Post Review Mei 2010 Mei 2010 Juni 2010
Post Review Mei 2010 Mei 2010 Juni 2010
PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)
Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$
Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)
Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender
Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD
Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan
II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I
Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)
RENCANA/ RELISASI PENGADAAN TA 2010 *
Unit Kerja : PSDA Prov. Jawa Barat Status : April 2010
No Kode Nama PaketEstimasi
Biaya (Rp)
Estimasi Biaya
eqv(US$)
Metode Pengadaa
n
Post/ Prior Review
Pengumuman Pengadaan
Pemasukan Penawaran
Eval/ NegoPenandata-
nganan Kontrak
Jangka Waktu
Kontrak
Keterangan: Permasalahan/
1 2 3 4 5 6 7 8 9 10 11 12 13
I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING
II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)
Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -
TOTAL KEGIATAN II (GOI-PF/APBD) - 0
Sub Prject A2 (Category 8)
Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C