Water Resources and Irrigation Sector Management Project ... · * dilaporkan setiap triwulan oleh...

25
RENCANA/ RELISASI PENGADAAN TA 2009 * Unit Kerja No Kode Nama Paket Estimasi Biaya (Rp) Estimasi Biaya eqv(US$) Metode Pengadaan 1 2 3 4 5 6 I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING RIM B (Category 6) Sub Prject A1 (Category 7) Sub Prject A2 (Category 8) Consulting Services (Category 3) Training, Workshop (Category 4) RIM A (Category 5) Water Resources and Irrigation Sector Management Project (WISMP) APL I Komponen B & C Civil Works (Category 1) Goods (Category 2) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Transcript of Water Resources and Irrigation Sector Management Project ... · * dilaporkan setiap triwulan oleh...

RENCANA/ RELISASI PENGADAAN TA 2009 *

Unit Kerja

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

RIM B (Category 6)

Sub Prject A1 (Category 7)

Sub Prject A2 (Category 8)

Consulting Services (Category 3)

Training, Workshop (Category 4)

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C

Civil Works (Category 1)

Goods (Category 2)

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

1. Pekerjaan Konstruksi (Civil Works) :

Sub Prject B1/B2 (Category 9)

Status : Januari 2009

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Balai PSDA Cimanuk-Cisanggarung

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 134,990,000 15,881 NS

1 CW 1 Perbaikan prasarana sungai 212,000,000 24,941 SW

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1Penyediaan jaringan global berbasis perangkat keras dan lunak

6,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 346,990,000 40,822TOTAL KEGIATAN I (Loan + Pend) 346,990,000 40,822

TOTAL KEGIATAN II (GOI-PF/APBD) 6,000,000 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,000

1. Pekerjaan Konstruksi (Civil Works) :

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A

Goods (Category 2)

4. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : April 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Balai PSDA Citanduy

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 285,642,000 33,605 NS

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 285,642,000 33,605TOTAL KEGIATAN I (Loan + Pend) 285,642,000 33,605

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi

1. Pekerjaan Konstruksi (Civil Works) :

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A

Goods (Category 2)

paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : April 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Balai PSDA Ciliwung - Cisadane

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Rasionalisasi jaringan hidrologi 20,800,000 2,447 NS

1 CW 1 Perbaikan prasarana sungai 350,000,000 41,176 NCB

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1Penyediaan jaringan global berbasis perangkat keras dan lunak

10,800,000

2 Perbaikan prasarana sungai 90,000,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 370,800,000 43,624TOTAL KEGIATAN I (Loan + Pend) 370,800,000 43,624

TOTAL KEGIATAN II (GOI-PF/APBD) 100,800,000 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

1. Pekerjaan Konstruksi (Civil Works) :

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A

Goods (Category 2)

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : April 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Prior Review Kont. I

Juni 2010 Juli 2010 Juli 2010 Agst 2010

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Balai PSDA Citarum

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1 Pengadaan peralatan laboratorium 65,000,000 7,647 NS2 GD 2 Penyediaan jaringan global berbasis perangkat keras dan lunak 3,150,000 370.59

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1Penyediaan jaringan global berbasis perangkat keras dan lunak

10,800,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 68,150,000 8,018TOTAL KEGIATAN I (Loan + Pend) 68,150,000 8,018

TOTAL KEGIATAN II (GOI-PF/APBD) 10,800,000 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,0002. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

1. Pekerjaan Konstruksi (Civil Works) :

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A

Goods (Category 2)

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : April 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : Balai PSDA Cisadea - Cibareno

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaan

1 2 3 4 5 6

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

1 GD 1Penyediaan jaringan global berbasis perangkat keras dan lunak

10,800,000 1,271 NS

2

1 Perbaikan prasarana sungai 90,000,000 10,588 SW

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

1 Rasionalisasi jaringan hidrologi 11,500,000

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) 100,800,000 11,859TOTAL KEGIATAN I (Loan + Pend) 100,800,000 11,859

TOTAL KEGIATAN II (GOI-PF/APBD) 11,500,000 0

KETERANGAN : 1 US$ = Rp. 8.500 PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

1. Force Account (FA) untuk pekerjaan Rim - B < Rp. 127,500,0002. Comm. Driven Development (CDD) untuk pek Irigasi < Rp. 425,000,0003. Small Works (SW) < Rp. 212,500,0004. National Competitive Bidding (NCB) < Rp. 4,250,000,000

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam Rp2. Pengadaan Barang (Goods) :

1. National Shopping (NS) < Rp. 212,500,000 Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ 2. National Competitive Bidding (NCB) < Rp. 1,700,000,000

3. Pengadaan Konsultan (Consulting Services) :1. Consultant Qualification Selection (CQS) < Rp. 850,000,000

1. Pekerjaan Konstruksi (Civil Works) :

RIM A (Category 5)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen A

Goods (Category 2)

2. Quality and Cost Based Selection (QCBS) < Rp. 3,400,000,0003. Quality Based Selection (QBS) < Rp. 3,400,000,0004. Individual Consultant (IC) < Rp. 425,000,000 Bila sudah terkontrak, agar diisi

* dilaporkan setiap triwulan oleh para PIU / KPIU ke NPMU melalui PPMU/KPMU

** Untuk Prior Review Kontrak I: dipilih salah satu paket untuk minta persetujuan NOL Bank Dunia, Bila sudah terkontrak, agar diisi paket lainnya cukup Post Review, & dilaksanakan setelah paket yang pertama mendapat NOLII. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)(termasuk paket kontrak I pekerjaan sejenis sudah mendapat NOL pada TA sebelumnya).

Categary yang tidak ada tidak perlu ditulis

Status : April 2010

Post/ Prior Review

Pengumuman

Pengadaan

Pemasukan

PenawaranEval/ Nego

Penandata-nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

7 8 9 10 11 12 13

Post Review Mei 2010 Mei 2010 Juni 2010

Post Review Mei 2010 Mei 2010 Juni 2010

PETUNJUK PENGISIANI. Kegiatan yang dibiayai (Loan + GOI pendamping/APBN)

Kolom 1 : Nomor UrutKolom 2: Kode pengadaan, mis. barang : Gd 1, Gd 2, konstruksi : CW 1, CW 2, konsultan : CS 1, dstKolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Selain Category 3: Estimasi biaya (Loan 100%) > dalam Rp

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > dalam RpKolom 5: Selain Category 3: Estimasi biaya (Loan 100%) > eqv. US$

Category 3: Estimasi biaya (Loan + GOI pendamping/APBN) > eqv. US$ Kolom 6: Metoda Pengadaan, mis NS, DC, NCB, ICB, SW, CDD, CQS, QCBS, SSS, QBS, ICKolom 7: Post Review, Prior Review Kontrak I **, Prior ReviewKolom 8: Rencana pengumuman (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 9: Rencana pemasukan penawaran (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Kolom 10: Rencana evaluasi/negosiasi (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)Kolom 11: Rencana penandatanganan kontrak (status triwulan I: bln/ tahun, bila sdh terealisasi tgl/ bln/ thn)

Bila sudah terkontrak, agar diisi Tgl & No. KontrakKolom 12: Hari/Bulan Kalender

Kolom 13: Penjelasan yang perlu, atau bila ada permasalahan, mis. TOR atau NOL belum disetujui BD

Bila sudah terkontrak, agar diisi Nilai Kontrak & Nama Rekanan

II. Kegiatan yang dibiayai GOI (Paralel Financing/APBD)Kolom : 1, 2, 8, 9, 10, 11, 12, 13 > cara pengisian sama dg kegiatan I

Kolom 3: Nama paket pekerjaan, agar ditulis setiap paketKolom 4: Estimasi biaya, dalam RpKolom 5 : diisi (0) Kolom 6: Metoda Pengadaan sesuai Keppres 80/2003Kolom 7 : diisi (–)

RENCANA/ RELISASI PENGADAAN TA 2010 *

Unit Kerja : PSDA Prov. Jawa Barat Status : April 2010

No Kode Nama PaketEstimasi

Biaya (Rp)

Estimasi Biaya

eqv(US$)

Metode Pengadaa

n

Post/ Prior Review

Pengumuman Pengadaan

Pemasukan Penawaran

Eval/ NegoPenandata-

nganan Kontrak

Jangka Waktu

Kontrak

Keterangan: Permasalahan/

1 2 3 4 5 6 7 8 9 10 11 12 13

I KEGIATAN YANG DIBIAYAI LOAN & GOI/ PENDAMPING

II KEGIATAN YANG DIBIAYAI GOI (PARALEL FINANCING/APBD)

Sub Total Keg Cat 3 (Loan + Pend) - -Sub Total Keg Selain Cat 3 (Loan) - -TOTAL KEGIATAN I (Loan + Pend) - -

TOTAL KEGIATAN II (GOI-PF/APBD) - 0

Sub Prject A2 (Category 8)

Water Resources and Irrigation Sector Management Project (WISMP) APL IKomponen B & C