1. PERHITUNGAN DIMENSI TEMBOK PENAHAN
e
11
H
a
D
a b c d
B
KETERANGAN :
= 1.75 m
= 2.21 me = 1.80 m
a = 20
H = + = 3.96 mB = 2/3 x H = 2.64 mD = H/6 = 0.66 ma = D = 0.66 mb =
1.201= (5 - 1) .Tan 20 = mc = 10 cm + e = 0.50 md = B-(a+b+c) = 0.28 m
H1
H2
H1
H2
o
H1 H2
(H -D). tan a
2. PERHITUNGAN TEKANAN TANAHPERHITUNGAN KOEFISIEN TEKANAN TANAH
KETERANGAN :
= 12.5
= 15.5
KOEFISIEN TEKANAN TANAH AKTIF DENGAN RUMUS RANKINE
Ka = 1 - sin f1 + cosf
Ka1 = 1 - sin 12.5 = 1.0011575355
1 + cos 12.5 0.9829227655
= 1.0185516
Ka2 = 1 - sin 15.5 = 0.99639646261 + cos 15.5 0.9829227655
= 1.0137078
PERHITUNGAN TEKANAN TANAH LATERALq = 12.50 t/m
= 0.60
= 0.85
= 1.75
= 1.85
H1
H
P1H2
P2
TEKANAN TANAH AKTIF
= q . = 12.50 1.75 1.01855158 - 2 0.60 1.009233= 21.0752886 t/m
= 1/2 2
= 0.5 1.75 1.75 2 1.0185516 - 2 0.60 1.009233= 1.52387277 t/m
= q. +
= 12.50 + 1.75 1.75 2.21 1.013708 - 2 0.85 1.006831= 17.6551049 t/m
= 1/2 2
= 0.5 0.75 2.21 2 1.01371 - 2 0.85 1.006831= 0.15084773 t/m
f1 o
f2 o
C1 t/m2
C2 t/m2
g1 t/m3
g2 t/m3
Pa1
Pa2
Pa3 Pa4
Pa1 H1 . Ka1 - 2 . C1 Ka1
Pa2 g1 H1 . Ka1 - 2 . C1 Ka1
Pa3 g1 H1 H2 Ka2 - 2 . C2 Ka2
Pa4 . g2 H2 . Ka2 - 2 . C2 Ka2
Pa Total = + + += 21.08 + 1.52387 + 17.6551 + 0.151= 40.4051140544648 t/m
PaH = Pa Total PaH = Pa . Total= 40.4051140545= 40.4051141 t/m
Pa PaV = Pa . TotalPaV = Pa Total
= 40.4051140545= 40.4051141 t/m
JARAK LENGAN (z)
== 3.96 - 0.5 1.75= 3.085 m
== 3.96 - 0.667 1.75= 2.793333 m
== 3.96 - 1.75 - 0.5 1.55= 1.435 m
== 3.96 - 1.75 - 0.666667 1.55= 1.176667 m
MENGHITUNG MOMEN AKIBAT GAYA HORIZONTAL (PaH)
GAYA Pa (t/m) PaH (t/m) My (tm)
21.0752886355 21.0752886354508 3.085 65.01726544
1.52387276661 1.5238727666072 2.793333333 4.256684595
17.6551049243 17.6551049242925 1.435 25.33507557
0.15084772811 0.150847728114264 1.176666667 0.17749749340.4051140544648 94.78652309
DIPEROLEH RESULTAN (y) = = 2.345904 m
Pa1 Pa2 Pa3 Pa4
za1 ( H - 1/2 H1)
za2 ( H - 2/3 H1)
za3 ( H - H1 - (1/2 H2))
za4 ( H - H1 - (2/3 H2))
LENGAN (y) (m)
Pa1
Pa2
Pa3
Pa4
S MyS PaH
3 PERHITUNGAN BERAT TANAH DAN KONSTRUKSI
e
h Diketahui :H = 3.96 m
= 1.75 m
= 1.550 m
B = 2.64 ma = 1.015 mb = 0.365 m
H c = 0.50 md = 1.45 m
e = m
a = D m
D
a b c d
BLUASAN
= . d= 2.50 1.45
= 3.625
= . d= 1.550 1.45
= 2.2475
== 2.50 + 1.550 . 0.5
= 2.025
= 1/2 b= 0.5 0.365 3.30
= 0.60225
= B . D= 2.64 . 1.015
= 2.6796
H1
H2
A1 H1
A3
A4 A2
H2
A5
A1 H1
m2
A2 H2
m2
A3 (H1 + H2) . c
m2
A4 (H1+H2)
m2
A5
m2
BERAT TANAH DAN KONSTRUKSIDIKETAHUI :
= 1.75
= 1.85
= 2.4
= .= 3.625 . 1.75= 6.34375 tm
= .= 2.2475 . 0.75= 1.685625
= .= 2.025 . 2.4= 4.86 tm
= .= 0.60225 . 2.4= 1.4454 tm
= .= 2.6796 . 2.4= 6.43104 tm
= q . e= 12.50 0= 0 tm
= q . d= 12.50 1.45= 18.125 tm
JUMLAH BERAT TOTAL TANAH DAN KONSTRUKSI = 38.890815 tm
PERHITUNGAN LENGAN TEKANAN TANAH (x)xq = ( 0,5 .(e+d))+c+b+a = 0.5 1.45 + 0.500 + 0.365 + 1.015 = 2.605 m
= ( 0,5 .d)+c+b+a = 0.5 1.45 + 0.500 + 0.365 + 1.015 = 2.605 m
= ( 0,5 .d)+c+b+a = 0.5 1.45 + 0.500 + 0.365 + 1.015 = 2.605 m
= ( 0,5 .c)+b+a = 0.5 0.50 + 0.365 + 1.015 = 1.63 m
= (2/3.b + a) = 1 0.37 + 1.015 = 1.258333333 m
= (1/2.B) = (1/2. B) = 1.32 m
PERHITUNGAN MOMEN AKIBAT BERAT TANAH DAN KONSTRUKSI / GAYA VERTIKAL
NO MOMEN (M) (tm)
0 0 2.605 01 6.34375 2.605 16.525468752 1.685625 2.605 4.3910531253 4.86 1.63 7.92184 1.4454 1.25833333333 1.8187955 6.43104 1.32 8.4889728
20.765815 39.146089675
MOMEN AKIBAT GAYA VERTIKAL (Mw) = 39.14609 tm= 20.76581 ton= 38.89081 ton
RESULTAN AKIBAT GAYA VERTIKAL (x) = Mw total = 1.885122 mW total
g1 t/m3 Wn = An . gn
g2 t/m3
gp t/m3
W1 A1 g1
W2 A2 g2
W3 A3 gp
W4 A4 gp
W5 A5 gp
Wq1
Wq2
(Wtotal)
x1
x2
x3
x4
x5
BERAT (W) (ton)
LENGAN (x) (M)
S GAYA-GAYA VERTIKALS GAYA BERAT KONSTRUKSI & TANAH
4 PERHITUNGAN STABILITAS DINDINGA. STABILITAS GESER
FAKTOR KEAMANAN TERHADAP GESER : 1.5 - 2SF = 1,5 DIPAKAI APABILA TIDAK MEMPERHITUNGKAN TEKANAN TANAH PASIF SF = 2,0 DIPAKAI APABILA MEMPERHITUNGKAN TEKANAN TANAH PASIF (Pp)
F = Fr
> 1.5
=20.7658
> 1.540.4051
= 0.51394 > 1.5 (oke)
DIMANA : Fr = JUMLAH GAYA-GAYA PENOLAK=
B. STABILITAS GULINGFAKTOR KEAMANAN TERHADAP GULING : 1.5 - 2SF = 1,5 DIPAKAI PADA TANAH KOHESIF (C)SF = 2,0 DIPAKAI PADA TANAH NON KOHESIF
= 39.14609 tm = 94.78652 tm
F = > 1.5
=39.1461 tm
> 1.594.7865 tm
= 0.41299215 > 1.5 (oke)
DIMANA : = JUMLAH MOMEN MELAWAN GULING = JUMLAH MOMEN SEARAH GULING
C. STABILITAS EKSENTRISITAS
e =B
- R <B
2 6
DIMANA : e = EksentrisitasB = Lebar dasar penahan tembokR = Junlah momen guling dibagi vertikal
e =B
- <B
2 6
=2.64
-39.14608967 - 94.78652
<2.64
2 38.890815 + 40.40511 6
= 1.32 - -0.70168083 < 0.44= 2.02168083 < 0.44
S PaH
(SV)S PaH JUMLAH GAYA-GAYA PENDORONG (Pa . Cos b . )
SMw SMy
S MwS My
S MwS My
S Mr - S MoS W + S PaV
5 PERHITUNGAN DAYA DUKUNG PONDASI
DAYA DUKUNG PONDASI MENURUT FORMULA HANSEN
=
qu = Daya dukung izin
q = Tekanan tanah efektif pada level dasar pondasi g = Berat isi tanah = 1.85B = Lebar dasar Pondasi = 2.64 m
= Faktor bentuk= Faktor kedalaman= Faktor kemiringan beton= Faktor daya dukung
q' =
= 1.85 * 2.21= 4.0885
B' = B - 2 * c= 2.64 - 2 * 0.5= 1.64 m
Nq =
= 16 45 + 7.75= 4.13449951988561
== 2* 4.1345 + 1 tan 16= 2.84784547665547
=
= 16 1 - sin 16 2 2.21 / 2.64= 1.40132125515561
=
== 1
Sq = (Diambil panjang pondasi (L) = 6 m)= 1 + 2.64 / 6 tan 15.5= 1.12202279938633
= 1 - 0.4 *B/L= 1 - 0.4 * 2.64 / 6= 0.824
Jadi :
=
= 34.6084591961
qu q . Nq . Sq . dq . iq + 1/2 . g2 . B . Ng . Sg . dg . igDimana :
t/m3
Sq,Sgdq,dgiq,ig
Nq,Ng
g2 . H2
ep.Tan.f2Tan2(45+f2/2)
ep.Tan. Tan2
Ng 2*(Nq+1)Tan f
dq=dg 1 + 2*Tan f2(1 - Sin f)2*H2/B'
1 + 2*Tan
iq = ig (1 - b/90)2
(1 - 0/90)2
1 + B/L * tan f2
Sg
qu q . Nq . Sq . dq . iq + 1/2 . g2 . B . Ng . Sg . dg . igt/m2
6 PERHITUNGAN PENURUNAN (SETTLEMENT) PONDASI
Sc = Stf - Si
Stf =
Si =
Dimana : Sc = Penurunan konsolidasiSi = Penurunan seketikaStf = Penurunan total akhirH = Tinggi abutmenB = Lebar abutmenq = Tekanan overburden
Vu = Angka poison tanah kondisi undrinedEu = Modulus elastisitas tanah kondisi undrined Vd = Angka poison tanah kondisi drinedEd = Modulus elastisitas tanah kondisi drined
Jika lapisan tanah mempunyai lapisan sebagai berikutEu = 5000 Kpa Vu = 0.5Ed = 4500 Kpa Vd = 0.2
Bila pondasi dianggap pondasi lentur
H/B =3.96
= 1.5 Dengan tabel Lee didapat Ii = 0.252.64Persamaan umum penurunan elastisitas
S =Penurunan seketika diprediksikan dengan menggunakan parameter undrined
Si =Dimana: q = Q desain . Pi (tekanan overburden total)Q desain = SF = 1 - 3 (dipakai) 1.5
L = 6 mQ desain = 20.765815 * 6 * 1.5
= 186.8923 t/m
Pc = == 0.85 * 3.96 * 6 * 2.64 = 1.85 - 1.00= 53.31744 = 0.85
q = 186.8923 - 53.31744
= 133.5749
Si =
= 133.5749 * 2.64 [( 1 - 0.5 5000 ] 0.25= 0.01322391 m
Penurunan seketika diprediksikan dengan menggunakan parameter undrined
Si =
= 133.5749 * 2.64 [( 1 - 0.2 4500 ] 0.25= 0.01880735 m
Maka penurunan konsolidasi pada pondasiSc = Stf - Si
= 0.013224 + 0.018807345216= 0.03203126 m 3.203 cm
q . B ((1 - Vd2)/Ed) . Ii
q . B ((1 - Vu2)/Eu) . Ii
q . B[(I - vs2)/Es] . Ii
q . B[(I - vc2)/Eu] . Ii
SV . L . SF
gs . Df . L . B gs (g2 - gw)
t/m2
q . B ((1 - Vu2)/Eu) . Ii2)/
q . B[(I - vc2)/Eu] . Ii2)/