Tugas 2 (Struktur Baja 2)

12
q=2,0 t/m q=3,0 t/m q=2,0 t/m q=4,0 t/m P=2,0 t P=1,0 t/m A B C D 4,0 m 5,0 m 6,0 m 2,0 m 17,0 m TUGAS 2 STRUKTUR BAJA II Nama : Fulgencio Valeiro Bras Soares Nim : 1361121020 Soal: Dik:  q 1  = 2,0 t/m, q 2 = 3,0 t/m, q 3  = 4,0t/m, q 4  = 2,0 tm.  P 1 = 1,0 t, P 2  = 2,0 t. Ditanya: Rencanakan Penampang Balok dan Baja IWF?

Transcript of Tugas 2 (Struktur Baja 2)

Page 1: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 1/12

q=2,0 t/m q=3,0 t/m

q=2,0 t/m

q=4,0 t/m

P=2,0 tP=1,0 t/m

A B C D

4,0 m 5,0 m 6,0 m 2,0 m

17,0 m

TUGAS 2

STRUKTUR BAJA II

Nama : Fulgencio Valeiro Bras Soares

Nim : 1361121020

Soal:

Dik:

  q1 = 2,0 t/m, q2 = 3,0 t/m, q3 = 4,0t/m, q4 = 2,0 tm.

  P1 = 1,0 t, P2 = 2,0 t.

Ditanya:

Rencanakan Penampang Balok dan Baja IWF?

Page 2: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 2/12

Jawaban:

  Perhitungan Bidang Momen (M), Geser (D), Normal (N).

Pada perencanaan balok untuk menghitung Momen, gaya geser dan gaya normal

digunakan SAP2000 v. 11. Langkah perhitungannya adalah:

a.  Menentukan Material Baja.

  Mutu baja = BJ 37

  Modulus Elastisitas = 200000 Mpa

  Tegangan leleh minimum (Fy) = 240 Mpa

  Tegangan putus minimum (Fu) = 370 Mpa

Page 3: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 3/12

 b. Menentukan Dimensi Profile Balok.

  Batang 1, 2, 3 dan 4 Menggunakan Profil IWF 340 x 137

c.  Menentukan Load Case.

Page 4: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 4/12

d.  Langkah input beban.

  Membuat balok penmpang.

  Dimensi Batang.

  Input Beban

Page 5: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 5/12

e.  Diagram hasil running SAP2000 Versi 2011, Bidang Momen (M).

f.  Diagram hasil running SAP2000 Versi 2011, Bidang Lintang (D).

g.  Diagram Bidang Normal (N).

Page 6: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 6/12

h.  Check hasil steel desing section.

i.  Check hasil steel desing ratios (Nilai keamanan).

Page 7: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 7/12

  Dari perhitungan SAP 2000 V 11. Bidang M, D, dan N diatas maka:

Data Perencanaan :

1.  Profile = IWF 340 X 137

2.  Panjang bentang (L = a) = 5.0 m

3.  Mutu baja ( ) = 240 MPa

4.  Modulus elastisitas = 200000 MPa

5.  = 112039528 Nmm

6.  = 112039528 Nmm

7.  Gaya lintang maksimum ( ) = 125066,51 N

Digunakan Profile IWF 340x137

d = 340 mm

 bf = 137 mm

tw = 12,2 mm

tf = 18,3 mm

Luas (A) = 86,80 cm2

= 8680 mm

 berat = 68,14 kg/m = 681,4 N/m

Sx = 924 cm3

= 942000 mm3

Sy = 98 cm3= 98000 mm

3

ix = 13,45 cm = 134,5 mm

iy = 2,79 cm = 29,7 mm

Ix = 15700 cm4= 157 x 10

6mm

 

Iy = 674 cm4 = 674 x 104 mm

Kuat Lentur Nominal :

A.  Berdasarkan Kelangsingan

Mn = Mp = Sx .

Page 8: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 8/12

Mnx = 942000 x 240 = 22608 x 104 Nmm

Mn = Mp = Sy .

Mnx = 98000 x 240 = 2352 x 104 Nmm

B.  Berdasarkan Panjang Bentang

Page 9: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 9/12

L = 5100 mm (panjang bentang)

Jadi

Kontrol:

1.  Kontrol Tegangan

2.  Kontrol terhadap Geser

(Asumsi balok tanpa pengaku)

Page 10: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 10/12

 

3.  Kontrol terhadap lendutan

Menurut SNI 03-1729-2002 pasal 6,4,3 batas lendutan maksimum

untuk balok pemikul dinding adalah:

Beban yang bekerja :

Page 11: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)

http://slidepdf.com/reader/full/tugas-2-struktur-baja-2 11/12

 

4.  Kontrol berdasarkan interaksi geser dan tumpu

o  Metode Distribusi

Berdasarkan SNI 03-1729-2002 pasal 8,9,2 :

Kontrol :

o  Metode Interraksi :

Balok direncanakan untuk memikul kombinasi lentur dangeser, yaitu :

Page 12: Tugas 2 (Struktur Baja 2)

7/27/2019 Tugas 2 (Struktur Baja 2)